Quarterlytics / Energy / Uranium / Energy Fuels Inc.

Energy Fuels Inc.

uuuu · NYSE Energy
Claim this profile
Ticker uuuu
Exchange NYSE
Sector Energy
Industry Uranium
Employees 51-200
← All annual reports
FY2017 Annual Report · Energy Fuels Inc.
Sign in to download
Loading PDF…
UNITED STATES 
SECURITIES AND EXCHANGE COMMISSION 
Washington, D.C. 20549 

FORM 10-K 
[X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 

For the fiscal year ended December 31, 2017 

OR 

[   ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 
1934 

For the transition period from 

to   
Commission file number: 001-36204 

ENERGY FUELS INC. 
(Exact Name of Registrant as Specified in its Charter) 

Ontario, Canada 

98-1067994 

(State of other jurisdiction of incorporation or 

(I.R.S. Employer Identification No.) 

organization) 

225 Union Blvd., Suite 600 

Lakewood, Colorado 

(Address of Principal Executive Offices) 

80228 

(Zip Code) 

(303) 389-4130 
(Registrant’s Telephone Number, including Area Code) 

SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT: 

Title of Each Class 

Name of Each Exchange on Which Registered 

Common Shares, no par value 

NYSE American, Toronto Stock Exchange 

SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT: None 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. 
Yes [   ] 

No [X] 

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. 
Yes [   ] 

No [X] 

Indicate by checkmark whether the registrant (1) filed all reports required to be filed by Section 13 or 15(d) of the Securities 
Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such 
reports), and (2) has been subject to such filing requirements for the past 90 days. 

 
 
 
 
 
 
 
Yes [X]        No [   ] 
Indicate by check mark whether the Registrant has submitted electronically and posted on its corporate Web site, if any, every 
Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 229.405 of this chapter) during 
the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). 
Yes [X]       No [   ] 

Indicate by checkmark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will 
not be contained, to the best of the registrant’s knowledge, in definitive proxy or information statements incorporated by reference 
in Part III of this Form 10-K or any amendment to the Form 10-K. [   ] 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See the 
definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and "emerging growth company" in Rule 
12b-2 of the Exchange Act (Check one): 

Large Accelerated Filer [   ]        Accelerated Filer [X]        Non-Accelerated Filer [   ]        Smaller Reporting Company [   ] 

Emerging Growth Company [X] 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). 

Yes [   ]        No [X] 

State the aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the 
price at which the common equity was last sold, or the average bid and asked price of such common equity, as of the last business 
day of the registrant’s most recently completed second fiscal quarter: $101,781,932 

The number of common shares of the Registrant outstanding as of March 8, 2018 was 75,676,406. 

DOCUMENTS INCORPORATED BY REFERENCE 
Certain information required for Items 10, 11, 12, 13 and 14 of Part III of this Annual Report on Form 10-K is incorporated by 
reference to the registrant’s definitive proxy statement for the 2018 Annual Meeting of Shareholders. 

 
 
SUBPARTS 

PART I 

PART II 

ENERGY FUELS INC. 
FORM 10-K 
For the Year Ended December 31, 2017 
TABLE OF CONTENTS 

ITEM I: CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS 

3 

ITEM II: CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING 
DISCLOSURE OF MINERAL RESOURCES 
ITEM III: GLOSSARY OF TECHNICAL TERMS 

ITEM 1. DESCRIPTION OF BUSINESS 

ITEM 1A. RISK FACTORS 

ITEM 1B. UNRESOLVED STAFF COMMENTS 

ITEM 2. DESCRIPTION OF PROPERTIES 

ITEM 2A. OVERVIEW 

ITEM 2B. SUMMARY OF MINERAL RESERVES AND RESOURCES 

ITEM 2C. THE NICHOLS RANCH PROJECT 

ITEM 2D. THE ALTA MESA PROJECT 

ITEM 2E. THE WHITE MESA MILL 

ITEM 2F. THE CANYON MINE 

ITEM 2G. THE ROCA HONDA PROJECT 

ITEM 2H. THE SHEEP MOUNTAIN PROJECT 

ITEM 2I. THE HENRY MOUNTAINS COMPLEX 

ITEM 2J. THE LA SAL PROJECT 

ITEM 2K. THE DANEROS PROJECT 

ITEM 2L. NON-MATERIAL MINERAL PROPERTIES 

ITEM 3. LEGAL PROCEEDINGS 

ITEM 4. MINE SAFETY DISCLOSURE 

ITEM 5. MARKET FOR THE REGISTRANT’S COMMON EQUITY, RELATED 
STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES 
ITEM 6. SELECTED FINANCIAL DATA 

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION 
AND RESULTS OF OPERATIONS 
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA 

ITEM 8A. REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM 

ITEM 8B. CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE 
LOSS 
ITEM 8C. CONSOLIDATED BALANCE SHEETS 

ITEM 8D. CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY 

ITEM 8E. CONSOLIDATED STATEMENTS OF CASH FLOWS 

ITEM 8F. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE 
YEARS ENDED DECEMBER 31, 2017 
ITEM 8F(i). THE COMPANY AND DESCRIPTION OF BUSINESS 

ITEM 8F(ii). BASIS OF PRESENTATION 

ITEM 8F(iii). SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES 

ITEM 8F(iv). ACQUISITION OF THE ALTA MESA ISR PROJECT 

1 

6 

8 

11 

24 

36 

37 

38 

40 

44 

54 

62 

67 

74 

80 

87 

93 

100 

106 

113 

114 

115 
118 

120 

131 

133 

134 

136 

137 

138 

140 

142 

142 

142 

142 

148 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 8F(v). ACQUISITION OF URANERZ ENERGY CORPORATION 

ITEM 8F(vi). RECEIVABLES 

ITEM 8F(vii). INVENTORIES 

ITEM 8F(viii). INTANGIBLE ASSETS 

ITEM 8F(ix). PLANT AND EQUIPMENT AND MINERAL PROPERTIES 

ITEM 8F(x). IMPAIRMENTS 

ITEM 8F(xi). ASSET RETIREMENT OBLIGATIONS AND RESTRICTED CASH 

ITEM 8F(xii). LOANS AND BORROWINGS 

ITEM 8F(xiii). CAPITAL STOCK 

ITEM 8F(xiv). BASIC AND DILUTED LOSS PER COMMON SHARE 

ITEM 8F(xv). SHARE-BASED PAYMENTS 

ITEM 8F(xvi). INCOME TAXES 

ITEM 8F(xvii). SUPPLEMENTAL FINANCIAL INFORMATION 

ITEM 8F(xviii). COMMITMENTS AND CONTINGENCIES 

ITEM 8F(xix). SEGMENT INFORMATION 

ITEM 8F(xx). UNAUDITED SUPPLEMENTARY QUARTERLY INFORMATION 

ITEM 8F(xxi). FAIR VALUE ACCOUNTING 

ITEM 8F(xxii). RELATED PARTY TRANSACTIONS 

ITEM 8F(xxiii). SUBSEQUENT EVENTS 

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON 
ACCOUNTING AND FINANCIAL DISCLOSURE 
ITEM 9A. CONTROLS AND PROCEDURES 

ITEM 9B. OTHER INFORMATION 

PART III 

PART IV 

SIGNATURES 

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE 

ITEM 11. EXECUTIVE COMPENSATION 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND 
MANAGEMENT AND RELATED STOCKHOLDER MATTERS 

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR 
INDEPENDENCE 
ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES 

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES 

ITEM 16. FORM 10-K SUMMARY 

149 

150 

150 

150 

151 

151 

152 

153 

154 

156 

156 

160 

162 

163 

164 

165 

165 

168 

168 

168 
169 

170 

171 

171 

171 

171 

171 

171 

176 

177 

2 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS 

This Annual Report and the exhibits attached hereto (the “Annual Report”) contain “forward-looking statements” within the 
meaning  of  applicable  US  and  Canadian  securities  laws.  Such  forward-looking  statements  concern  Energy  Fuels  Inc.’s  (the 
“Company”  or  “Energy  Fuels”)  anticipated  results  and  progress  of  the  Company’s  operations  in  future  periods,  planned 
exploration, and, if warranted, development of its properties, plans related to its business, and other matters that may occur in the 
future. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts 
not yet determinable and assumptions of management. 

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, 
schedules, assumptions, future events, or performance (often, but not always, using words or phrases such as “expects” or “does 
not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates” or “intends,” or stating that certain actions, 
events or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact 
and may be forward-looking statements. 

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. 
Energy Fuels believes that the expectations reflected in these forward-looking statements are reasonable, but no assurance can be 
given that these expectations will prove to be correct, and such forward-looking statements included in, or incorporated by reference 
into, this Annual Report should not be unduly relied upon. This information speaks only as of the date of this Annual Report. 

Readers are cautioned that it would be unreasonable to rely on any such forward-looking statements and information as creating 
any  legal rights,  and that the  statements  and information are  not guarantees  and  may  involve known and unknown risks  and 
uncertainties, and that actual results are likely to differ (and may differ materially) and objectives and strategies may differ or 
change from those expressed or implied in the forward-looking statements or information as a result of various factors. Such risks 
and uncertainties include risks generally encountered in the exploration, development, operation, and closure of mineral properties 
and processing facilities. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other 
factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, 
including, without limitation: 

• 
• 

• 

• 

• 

• 

• 
• 

• 

• 
• 

• 

• 

• 
• 

risks associated with mineral reserve and resource estimates, including the risk of errors in assumptions or methodologies; 
risks associated with estimating mineral extraction and recovery, forecasting future price levels necessary to support 
mineral extraction and recovery, and the Company’s ability to increase mineral extraction and recovery in response to 
any increases in commodity prices or other market conditions; 
uncertainties and liabilities inherent to conventional mineral extraction and recovery and/or in-situ uranium recovery 
operations; 
geological,  technical  and  processing  problems,  including  unanticipated  metallurgical  difficulties,  less  than  expected 
recoveries, ground control problems, process upsets, and equipment malfunctions; 
risks associated with the depletion of existing mineral resources through mining or extraction, without replacement with 
comparable resources; 
risks associated with identifying and obtaining adequate quantities of alternate feed materials and other feed sources 
required for operation of the White Mesa Mill; 
risks associated with labor costs, labor disturbances, and unavailability of skilled labor; 
risks  associated  with  the  availability  and/or  fluctuations  in  the  costs  of  raw  materials  and  consumables  used  in  the 
Company’s production processes; 
risks associated with environmental compliance and permitting, including those created by changes in environmental 
legislation and regulation, and delays in obtaining permits and licenses that could impact expected mineral extraction 
and recovery levels and costs; 
actions taken by regulatory authorities with respect to mineral extraction and recovery activities; 
risks associated with the Company’s dependence on third parties in the provision of transportation and other critical 
services; 
risks associated with the ability of the Company to extend or renew land tenure, including mineral leases and surface use 
agreements, on favorable terms or at all; 
risks associated with the ability of the Company to negotiate access rights on certain properties on favorable terms or at 
all; 
the adequacy of the Company's insurance coverage; 
uncertainty as to reclamation and decommissioning liabilities; 

3 

 
 
• 

• 

• 
• 
• 
• 
• 
• 
• 
• 

• 

• 

• 
• 
• 
• 
• 
• 

• 

• 

• 
• 
• 
• 
• 
• 
• 
• 
• 
• 

• 
• 
• 
• 

the ability of the Company’s bonding companies to require increases in the collateral required to secure reclamation 
obligations; 
the potential for, and outcome of, litigation and other legal proceedings, including potential injunctions pending the 
outcome of such litigation and proceedings; 
the ability of the Company to meet its obligations to its creditors; 
risks associated with paying off indebtedness at its maturity; 
risks associated with the Company’s relationships with its business and joint venture partners; 
failure to obtain industry partner, government, and other third party consents and approvals, when required; 
competition for, among other things, capital, mineral properties, and skilled personnel; 
failure to complete proposed acquisitions and incorrect assessments of the value of completed acquisitions; 
risks posed by fluctuations in share price levels, exchange rates and interest rates, and general economic conditions; 
risks inherent in the Company’s and industry analysts’ forecasts or predictions of future uranium and vanadium price 
levels; 
fluctuations in the market prices of uranium, vanadium and copper, which are cyclical and subject to substantial price 
fluctuations; 
risks associated with the Company's existing long-term sales contracts expiring following the Company's 2018 deliveries, 
and all uranium sales after 2018 being required to be made at spot prices, unless the Company is able to enter into new 
long-term contracts at satisfactory prices in the future; 
failure to obtain suitable uranium sales terms at satisfactory prices in the future, including spot and term sale contracts; 
risks associated with asset impairment as a result of market conditions; 
risks associated with lack of access to markets and the ability to access capital; 
the market price of Energy Fuels’ securities; 
public resistance to nuclear energy or uranium extraction and recovery; 
risks associated with inaccurate or nonobjective media coverage of the Company's activities and the impact such coverage 
may have on the public, the market for the Company's securities, government relations, permitting activities and legal 
challenges, as well as the costs to the Company of responding to such coverage; 
uranium industry competition, international trade restrictions and the impacts on world commodity prices of foreign state 
subsidized production; 
risks associated with the Company's involvement in industry petitions for trade remedies, including the costs of pursuing 
such  remedies  and  the  potential  for  negative  responses  or  repercussions  from  various  interest  groups,  consumers  of 
uranium and participants in other phases of the nuclear fuel cycle; 
risks related to higher than expected costs related to our Nichols Ranch Project and Canyon Project; 
risks related to our ability to recover copper from our Canyon Project ores; 
risks related to securities regulations; 
risks related to stock price and volume volatility; 
risks related to our ability to maintain our listing on the NYSE American and Toronto Stock Exchanges; 
risks related to our ability to maintain our inclusion in various stock indices; 
risks related to dilution of currently outstanding shares, from additional share issuances, depletion of assets or otherwise; 
risks related to our lack of dividends; 
risks related to recent market events; 
risks related to our issuance of additional common shares under our At-the-Market ("ATM") program or otherwise to 
provide adequate liquidity in depressed commodity market circumstances; 
risks related to acquisition and integration issues; 
risks related to defects in title to our mineral properties; 
risks related to our outstanding debt; and 
risks related to our securities. 

This list is not exhaustive of the factors that may affect our forward-looking statements. Some of the important risks and uncertainties 
that could affect forward-looking statements are described further under the section headings: Item 1. Description of the Business; 
Item 1A. Risk Factors; and Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of 
this Annual Report. Although we have attempted to identify important factors that could cause actual results to differ materially 

4 

 
from those described in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated 
or intended. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, 
actual results may vary materially from those anticipated, believed, estimated, or expected. We caution readers not to place undue 
reliance on any such forward-looking statements, which speak only as of the date made. Except as required by law, we disclaim 
any obligation to subsequently revise any forward-looking statements to reflect events or circumstances after the date of such 
statements or to reflect the occurrence of anticipated or unanticipated events. Statements relating to “Mineral Reserves” or “Mineral 
Resources” are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and 
assumptions that the Mineral Reserves and Mineral Resources described may be profitably extracted in the future. 

We qualify all the forward-looking statements contained in this Annual Report by the foregoing cautionary statements. 

5 

 
CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING 

DISCLOSURE OF MINERAL RESOURCES 

The Company is a U.S. Domestic Issuer for SEC purposes, most of its shareholders are U.S. residents and its primary trading 
market is the NYSE American. However, because the Company is also listed on the Toronto Stock Exchange ("TSX"), this Annual 
Report contains certain disclosure that satisfies the additional requirements of Canadian securities laws, which differ from the 
requirements of United States’ securities laws. Unless otherwise indicated, all reserve and resource  estimates included in this 
Annual Report, and in the documents incorporated by reference herein, have been prepared in accordance with Canadian National 
Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy 
and  Petroleum  (“CIM”)  classification  system.  NI  43-101  is  a  rule  developed  by  the  Canadian  Securities Administrators  (the 
“CSA”) which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning 
mineral projects. 

Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange 
Commission (the “SEC”), and reserve and resource information contained herein, or incorporated by reference in this Annual 
Report,  and  in  the  documents  incorporated  by  reference  herein,  may  not  be  comparable  to  similar  information  disclosed  by 
companies reporting under only United States standards. In particular, and without limiting the generality of the foregoing, the 
term “resource” does not equate to the term “reserve” under SEC Industry Guide 7. Under United States standards, mineralization 
may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and 
legally produced or extracted at the time the reserve determination is made. Under SEC Industry Guide 7 standards, a “final” or 
“bankable” feasibility study is required to report reserves; the three-year historical average price, to the extent possible, is used 
in any reserve or cash flow analysis to designate reserves; and the primary environmental analysis or report must be filed with the 
appropriate governmental authority. 

The SEC’s disclosure standards under Industry Guide 7 normally do not permit the inclusion of information concerning “Measured 
Mineral  Resources”,  “Indicated  Mineral  Resources”  or  “Inferred  Mineral  Resources”  or  other  descriptions  of  the  amount  of 
mineralization in mineral deposits that do not constitute “reserves” by United States standards in documents filed with the SEC. 
United States investors should also understand that “Inferred Mineral Resources” have a great amount of uncertainty as to their 
existence and as to their economic and legal feasibility. It cannot be assumed that all or any part of an “Inferred Mineral Resource” 
will ever be upgraded to a higher category. Under Canadian rules, estimated “Inferred Mineral Resources” may not form the basis 
of feasibility or pre-feasibility studies. United States investors are cautioned not to assume that all or any part of Measured 
or Indicated Mineral Resources will ever be converted into mineral reserves. Investors are cautioned not to assume that 
all or any part of an “Inferred Mineral Resource” exists or is economically or legally mineable. 

Disclosure of “contained pounds” or “contained ounces” in a resource estimate is permitted and typical disclosure under Canadian 
regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC 
standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of 
“reserves” are also not the same as those of the SEC, and reserves reported by the Company in compliance with NI 43-101 may 
not qualify as “reserves” under SEC Industry Guide 7 standards. Accordingly, information concerning mineral deposits set forth 
herein may not be comparable to information made public by companies that report in accordance with United States standards. 

Although the Company's primary trading market is the NYSE American, most of the Company's shareholders are U.S. residents, 
the Company is a U.S. domestic Issuer for SEC purposes, and the Company is required to report its financial results under U.S. 
Generally Accepted Accounting Principles ("GAAP"), as a company incorporated in Canada and also listed on the TSX, unless 
otherwise indicated, in order to comply with both Canadian and U.S. requirements, Energy Fuels estimates and reports our mineral 
resources and mineral reserves according to the definitions set forth in NI 43-101. All reserves that are reported in this Form 10- 
K are estimated in accordance with the definitions set forth in NI 43-101. The Company does not have any reserves which conform 
to SEC Industry Guide 7 for reporting in the U.S. The definitions for each reporting standard are presented below with supplementary 
explanation and descriptions of the parallels and differences. 

CIM and NI 43-101 Definitions: 

•  Feasibility Study: A “feasibility study” is a comprehensive technical and economic study of the selected development 
option for a mineral project that includes appropriately detailed assessments of applicable modifying factors, together 
with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time 
of reporting, that extraction is reasonably justified (economically minable). The results of the study may reasonably 
serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the 
development of the project. The confidence level of the study will be higher than that of a pre-feasibility study. 

6 

 
 
 
• 

• 

Indicated Mineral Resource1: An “indicated mineral resource” is that part of a mineral resource for which quantity, 
grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the 
application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability 
of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing 
and is sufficient to assume geological and grade or quality continuity between points of observation. An indicated 
mineral resource has a lower level of confidence than that applied to a measured mineral resource and may only be 
converted to a probable mineral reserve. 
Inferred Mineral Resource:2 An “inferred mineral resource” is that part of a mineral resource for which quantity and 
grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is 
sufficient to imply, but not verify, geological and grade or quality continuity. An inferred mineral resource has a lower 
level of confidence than that applied to an indicated mineral resource and must not be converted to a mineral reserve. 
It is reasonably expected that the majority of inferred mineral resources could be upgraded to "indicated mineral 
resources" with continued exploration. 

•  Measured Mineral Resource:3 A “measured mineral resource” is that part of a mineral resource for which quantity, 
grade or quality, densities, shape and physical characteristics are estimated with confidence sufficient to allow the 
application of modifying factors to support detailed mine planning and final evaluation of the economic viability of 
the deposit. Geological evidence is derived from detailed and reliable exploration, sampling, and testing and is 
sufficient to confirm geological and grade or quality continuity between points of observation. A measured mineral 
resource has a higher level of confidence than that applied to either an indicated mineral resource or an inferred 
mineral resource. It may be converted to a proven mineral reserve or to a probable mineral reserve. 

•  Mineral Reserve:4 A “mineral reserve” is the economically mineable part of a measured and/or indicated mineral 
resource. It includes diluting materials and allowances for losses which may occur when the mineral is mined or is 
extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of 
modifying factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. The 
reference point at which mineral reserves are defined, usually the point where the ore is delivered to the processing 
plant, must be stated. It is important that, in all situations where the reference point is different, such as for a saleable 
product, a clarifying statement is included to ensure that the reader is fully informed as to what is being reported. The 
public disclosure of a mineral reserve must be demonstrated by a pre-feasibility study or feasibility study. 

•  Mineral Resource:5 A “mineral resource” is a concentration or occurrence of solid material of economic interest in or 

on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual 
economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a 
mineral resource are known, estimated or interpreted from specific geological evidence and knowledge, including 
sampling. 

•  Modifying Factors: “Modifying factors” are considerations used to convert mineral resources to mineral reserves. 

These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, 
environmental, social, and governmental factors. 

•  Pre-Feasibility Study: A “pre-feasibility study” is a comprehensive study of a range of options for the technical and 
economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of 
underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of 
mineral processing is determined. It includes a financial analysis based on reasonable assumptions on the modifying 
factors and the evaluation of any other relevant factors which are sufficient for a qualified person, acting reasonably, to 
determine if all or part of the mineral resource may be converted to a mineral reserve at the time of reporting. A pre- 
feasibility study is at a lower confidence level than a feasibility study. 

•  Probable Mineral Reserve:6 A “probable mineral reserve” is the economically mineable part of an indicated, and in 
some circumstances, a measured mineral resource. The confidence in the modifying factors applied to a probable 
mineral reserve is lower than that applied to a proven mineral reserve. 

•  Proven Mineral Reserve:7 A “proven mineral reserve” is the economically minable part of a measured mineral 

resource. A proven mineral reserve implies a high degree of confidence in the modifying factors. 

1  SEC Industry Guide 7 does not recognize the designation of a deposit as an “Indicated Mineral Resource.” 
2  SEC Industry Guide 7 does not recognize the designation of a deposit as an “Inferred Mineral Resource.”   
3  SEC Industry Guide 7 does not recognize the designation of a deposit as a “Measured Mineral Resource.”  
4  SEC Industry Guide 7 does not recognize “reserves” calculated in accordance with NI 43-101. 
5  SEC Industry Guide 7 does not recognize the designation of a deposit as a “Mineral Resource.” 
6  SEC Industry Guide 7 does not recognize “reserves” calculated in accordance with NI 43-101. SEC Industry Guide 7 requires a 
final or “bankable” feasibility study for the designation of a deposit as a “reserve” that must include adequate information on 
mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic 

7 

 
 
 
 
extraction is justified. Further, all necessary permits must have been filed with the appropriate regulatory authorities including the 
primary environmental analysis or report. 

•  Qualified Person:8 A “qualified person” is an individual who: (a) is an engineer or geoscientist with a university 

degree, or equivalent accreditation, in an area of geoscience or engineering, relating to mineral exploration or mining; 
(b) has at least five years of experience in mineral exploration, mine development or operation, or mineral project 
assessment, or any combination of these, that is relevant to his or her professional degree or area of practice; (c) has 
experience relevant to the subject matter of the mineral project and technical report; (d) is in good standing with a 
professional association; and (e) in the case of a professional association in a non-Canadian jurisdiction, has a 
membership designation that (i) requires attainment of a position of responsibility in his or her profession that requires 
the exercise of independent judgment; and (ii) requires (A) a favorable confidential peer evaluation of the individual’s 
character, professional judgment, experience, and ethical fitness; or (B) a recommendation for membership by at least 
two peers, and demonstrated prominence or expertise in the field of mineral exploration or mining. 

SEC Industry Guide 7 Definitions: 

•  Exploration Stage: Includes all issuers engaged in the search for mineral deposits (reserves) which are not in either 

the development or production stage. 

•  Development Stage: Includes all issuers engaged in the preparation of an established commercially mineable deposit 

(reserves) for its extraction which are not yet in the production stage. 

•  Probable (Indicated) Reserves: Reserves for which quantity and grade and/or quality are computed from information 
similar to that used for proven (measured) reserves, but the sites for inspection, sampling and measurement are farther 
apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven reserves, is 
high enough to assume continuity between points of observation. 

•  Production Stage: Includes all issuers engaged in the exploitation of a mineral deposit (reserve). 
•  Proven (Measured) Reserves: Reserves for which (a) quantity is computed from dimensions revealed in outcrops, 
trenches, working, or drill holes; grade and/or quality are computed from the results of detailed sampling and (b) the 
sites for inspection, sampling and measurement are spaced so closely and the geological character is so well defined 
that size, shape, depth, and mineral content of reserves are well established. 

•  Reserve: That part of a mineral deposit which could be economically and legally extracted or produced at the time of 

the reserve determination. 

Note: as the Company does not have any mineral reserves within the meaning of SEC Industry Guide 7, it is considered to be in 
an Exploration Stage, regardless of its uranium recovery activities. 

GLOSSARY OF TECHNICAL TERMS 

The following defined technical terms are used in this Annual Report: 

•  Assay: The testing of a metal or ore to determine its ingredients and quality. 

•  Breccia: A rock in which angular fragments are surrounded by a mass of fine-grained materials. 

•  Copper: A red-brown metal, the chemical element of atomic number 29. 

•  Cut-off or cut-off grade: When determining economically viable mineral reserves,  the lowest grade of  mineralized 
material that can be mined economically. When determining mineral resources, the lowest grade of mineralized material 
included in the resource estimate. 

• 

eU3O8: This term refers to equivalent U3O8  grade derived by gamma logging of drill holes. 

•  EA: Environmental Assessment prepared under NEPA for a mineral project. 

•  EIS: Environmental Impact Statement prepared under NEPA for a mineral project. 

7  SEC Industry Guide 7 does not recognize “reserves” calculated in accordance with NI 43-101. SEC Industry Guide 7 requires a 
final or “bankable” feasibility study for the designation of a deposit as a “reserve” that must include adequate information on 
mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic 
extraction is justified. Further, all necessary permits must have been filed with the appropriate regulatory authorities including the 
primary environmental analysis or report. 
8  SEC Industry Guide 7 does not require designation of a qualified person. 

8 

 
 
 
 
 
 
•  Extraction: The process of physically extracting mineralized material from the ground. Exploration continues during 
the extraction process and, in many cases, mineralized material is expanded during the life of the extraction activities as 
the exploration potential of the deposit is realized. 

•  Formation: A distinct layer of sedimentary or volcanic rock of similar composition. 

•  Grade: Quantity or percentage of metal per unit weight of host rock. 

•  Host Rock: The rock containing a mineral or an ore body. 

• 

In-situ recovery ("ISR"): The recovery, by chemical means, of the uranium component of a deposit without the physical 
extraction of uranium-bearing material from the ground. ISR utilizes injection of appropriate oxidizing chemicals into a 
uranium-bearing sandstone deposit by injection wells, with the uranium-bearing solution being removed by extraction 
wells; also referred to as “solution mining.” 

•  Mineral: A naturally formed chemical element or compound having a definite chemical composition and, usually, a 

characteristic crystal form. 

•  Mineralization: A natural occurrence, in rocks or soil, of one or more metal yielding minerals. 

•  Mineralized material: Material that contains mineralization (e.g., uranium, vanadium and/or copper) and that is not 
included in  an  SEC  Reserve  as  it  does  not  meet  all  of  the  criteria  for  adequate  demonstration  of  economic  or  legal 
extraction. 

•  National Instrument 43-101 (“NI 43-101”): The National Instrument regarding Canadian standards of disclosure for 

mineral projects. 

•  NEPA: The United States National Environmental Policy Act of 1969, as amended. 

•  Open pit: Surface mineral extraction in which the mineralized material is extracted from a pit or quarry. 

•  Ore:  Mineral  bearing  rock  that  can  be  mined,  processed  and  concentrated  profitably  under  current  or  immediately 
foreseeable economic conditions. Under SEC Industry Guide 7, a company may only refer to reserves (as that term is 
defined in SEC Industry Guide 7) as “ore.” 

•  Ore body: Amostly solid and fairly continuous mass of in-ground mineralization estimated to be economically mineable. 

•  Outcrop: That part of a geologic formation or structure that appears at the surface of the Earth. 

•  PEA:  A  Preliminary  Economic  Assessment  performed  in  accordance  with  NI  43-101.  A  Preliminary  Economic 
Assessment is a study, other than a pre-feasibility study or feasibility study, which includes an economic analysis of the 
potential viability of mineral resources. 

•  PO:  Plan  of  Operations  for  a  mineral  project  prepared  in  accordance  with  applicable United  States  Bureau  of  Land 

Management or United States Forest Service regulations. 

•  Reclamation: The process by which lands disturbed as a result of mineral extraction activities are modified to support 
beneficial land use. Reclamation activity may include the removal of buildings, equipment, machinery, and other physical 
remnants of mining activities, closure of tailings storage facilities, leach pads, and other features, and contouring, covering 
and re-vegetation of waste rock, and other disturbed areas. 

•  RoD or Record of Decision: The final approval issued by the United States Bureau of Land Management or United 

States Forest Service for a PO. 

• 

SEC Industry Guide 7: U.S. reporting guidelines that apply to registrants engaged, or to be engaged, in significant 
mining operations. 

•  Uranium: a heavy, naturally radioactive, metallic element of atomic number 92. Uranium in its pure form is a heavy 
metal. Its two principal isotopes are U-238 and U-235, of which U-235 is the necessary component for the nuclear fuel 
cycle. However, “uranium” used in this Annual Report refers to triuranium octoxide, also called “U3O8” and the primary 
component  of  “yellowcake,”  and  is  produced  from  uranium  deposits.  It  is  the  most  actively  traded  uranium-related 
commodity. 

9 

 
•  Uranium concentrate: a yellowish  to  yellow-brownish powder obtained  from the chemical processing of  uranium- 
bearing  material.  Uranium  concentrate  typically  contains  70%  to  90%  U3O8  by  weight.  Uranium  concentrate  is  also 
referred to as “yellowcake.” 

•  % U3O8  Eq: equivalent uranium grade calculated by combining uranium content and copper content by taking into 

account commodity price and recovery factors. 

•  V2O5: Vanadium pentoxide, or the form of vanadium typically produced at the White Mesa Mill, also called “blackflake.” 

•  Yellowcake:  Another name for Uranium Concentrate. 

10 

 
General Development of the Business 

PART I 

ITEM 1. DESCRIPTION OF BUSINESS 

Corporate Structure 

The Company's corporate offices are in the Denver, Colorado metropolitan area, and all of its assets and employees are in the 
western United States, and are owned and operated by the Company's subsidiary, Energy Fuels Resources (USA) Inc., and its 
affiliates. 

The Company is an Ontario corporation. It was incorporated on June 24, 1987 in the Province of Alberta under the name “368408 
Alberta Inc.” In October 1987, 368408 Alberta Inc. changed its name to “Trevco Oil & Gas Ltd.” In May 1990, Trevco Oil & Gas 
Ltd. changed its name to “Trev Corp.” In August 1994, Trev Corp. changed its name to “Orogrande Resources Inc.” In April 2001, 
Orogrande Resources Inc. changed its name to “Volcanic Metals Exploration Inc.” On September 2, 2005, the Company was 
continued under the Business Corporations Act (Ontario). On March 26, 2006, Volcanic Metals Exploration Inc. acquired 100% 
of the outstanding shares of “Energy Fuels Resources Corporation.” On May 26, 2006, Volcanic Metals Exploration Inc. changed 
its name to “Energy Fuels Inc.” On November 5, 2013, the Company amended its Articles to consolidate its issued and outstanding 
common shares on the basis of one post-consolidation common share for every 50 pre-consolidation Common Shares. 

The Company conducts its operations through its U.S. subsidiaries, which have their principal place of business and corporate 
office at 225 Union Blvd., Suite 600, Lakewood, Colorado 80228, USA. The Company’s website address is www.energyfuels.com. 
The registered office of Energy Fuels Resources (USA) Inc. is at 225 Union Blvd., Suite 600, Lakewood, Colorado 80228, USA, 
and the registered office of the Company is located at 82 Richmond Street East; Suite 308 Toronto, Ontario, M5C 1P1, Canada. 

The primary trading market for Energy Fuels’ common shares (the “Common Shares”) is the NYSE American under the trading 
symbol “UUUU,” and the Company’s common shares are also listed on the TSX under the trading symbol “EFR.” Energy Fuels 
is a U.S. domestic issuer for SEC reporting purposes and, in addition, is a reporting issuer in all of the Canadian provinces. Certain 
warrants issued by the Company are listed on the NYSE American under the symbol "UUUU-WT." and are also listed on the TSX 
under the symbol "EFR.WT". Options on Energy Fuels’ common shares are traded on The Chicago Board Options Exchange. The 
Designated Primary Market Maker for the options is Group One Trading, LP. KCG Americas LLC is the Company’s Market Maker 
on the NYSE American. In addition, Energy Fuels’ Cdn $20.9 million aggregate amount of convertible debentures are listed on 
the TSX under the symbol “EFR.DB.” 

The  Company  conducts  its  uranium  extraction,  recovery,  and  sales  business,  and  owns  its  properties,  through  a  number  of 
subsidiaries. A diagram depicting the organizational structure of the Company and its active subsidiaries, including the name, 
country  of  incorporation,  and  proportion  of  ownership  interest,  is  included  as  Exhibit  21.1  to  this Annual  Report. All  of  the 
Company’s U.S. assets are held directly or indirectly through the Company’s wholly-owned subsidiaries Energy Fuels Holdings 
Corp. (“EF Holdings”) and Strathmore Minerals Corp. (“Strathmore”). EF Holdings and Strathmore hold all or a portion of their 
uranium extraction, recovery, permitting, evaluation and exploration assets through a number of additional subsidiaries, as detailed 
below. Energy Fuels also owns a number of inactive subsidiaries which have no material assets or liabilities and do not engage in 
any material business activities. 

All of the Company's properties are operated by Energy Fuels Resources (USA) Inc. (“EFUSA”), a wholly-owned subsidiary of 
EF Holdings. 

In addition, the Company holds 9,439,857 shares of Virginia Energy Resources Inc. (TSXV:VUI; OTCQX:VEGYF) currently 
representing an approximate 16.5% equity interest in that company, and 14,250,000  common shares of enCore Energy Corp. 
(TSXV:UE) currently representing an approximate 12.8% equity interest in that company. 

Business Overview 

Energy Fuels is engaged in conventional and in situ recovery (“ISR”) uranium extraction and recovery, along with the exploration, 
permitting, and evaluation of uranium properties in the United States. Its corporate offices are in the Denver, Colorado metropolitan 
area, and all of its assets and employees are in the western United States. Energy Fuels owns the Nichols Ranch Uranium Recovery 
Facility in Wyoming (the “Nichols Ranch Project”), which is one of the newest uranium recovery facilities operating in the 
United States, and the Alta Mesa Project in Texas (the "Alta Mesa Project"), which is a fully-permitted ISR production facility 
currently on care and maintenance. In addition, Energy Fuels owns the White Mesa Mill in Utah (the “White Mesa Mill” or 
“Mill”), which is the only conventional uranium recovery facility operating in the United States. The Company also owns uranium 
and  uranium/vanadium  properties  and  projects  in  various  stages  of  exploration,  permitting,  and  evaluation,  as  well  as  fully- 
permitted uranium and uranium/vanadium projects, and a uranium/copper project, on standby. The White Mesa Mill can also 
recover vanadium as a by-product of mineralized material produced from certain of its projects in Colorado and Utah, and is 

11 

 
 
 
 
 
 
evaluating recovering copper as a by-product from a uranium/copper project in Arizona. In addition, Energy Fuels recovers uranium 
from other uranium-bearing materials not derived from conventional material, referred to as “alternate feed materials,” at its White 
Mesa Mill. 

ISR Operations 

The Company conducts its ISR activities through its Nichols Ranch Project in northeast Wyoming, which it acquired in June 2015 
through its acquisition of Uranerz Energy Corporation (“Uranerz”), and its Alta Mesa Project in south Texas, which it acquired 
in June 2016 through its acquisition of Mesteña Uranium, LLC (“Mesteña”), which is now named EFR Alta Mesa LLC ("EFR 
Alta Mesa"). 

The Nichols Ranch Project includes: (i) a licensed and operating ISR processing facility (the “Nichols Ranch Plant”); (ii) licensed 
and  operating  ISR  wellfields  (the  “Nichols  Ranch  Wellfields”);  (iii)  additional  licensed  ISR  wellfields  planned  for  future 
production (the “Jane Dough Property”), and; (iv) a licensed satellite ISR uranium project (the “Hank Project”), which will 
include an ISR processing plant (the “Hank Satellite Plant”) that, when constructed, will produce loaded-resin, and associated 
planned wellfields (the “Hank Property”). See “The Nichols Ranch ISR Project” under Item 2 below. Also through the acquisition 
of Uranerz, the Company acquired the Reno Creek property (the “Reno Creek Property”), West North Butte property (the “West 
North Butte Property”), and the North Rolling Pin property (the “North Rolling Pin Property”), as well as the Arkose Mining 
Venture (the “Arkose Mining Venture”), which is a joint venture of Wyoming ISR properties held 81% by Energy Fuels. The 
Company  is  currently  under  contract  to  sell  the  Reno  Creek  Property  to  Uranium  Energy  Corp.  See  “Non-Material  Mineral 
Properties - Other ISR Projects” under Item 2 below. 

The Nichols Ranch Project is an operating ISR facility that recovers uranium through a series of injection and recovery wells. 
Using groundwater fortified with oxygen and sodium bicarbonate, uranium is dissolved within a deposit. The groundwater is then 
collected in a series of recovery wells and pumped to the Nichols Ranch Plant. The Nichols Ranch Plant creates a yellowcake 
slurry that is transported by truck to the White Mesa Mill, where it is dried and packaged into drums that are shipped to uranium 
conversion facilities. 

Construction of the Nichols Ranch Plant, other than the elution, drying and packaging circuits, was completed in 2013, and it 
commenced uranium recovery activities in the second quarter of 2014. In September of 2015, the Company commenced construction 
of an elution circuit at the Nichols Ranch Plant, which was completed and began operations in February 2016. During 2017, a 
total of 259,000 pounds of U3O8 were recovered from the Nichols Ranch Project. 

The Alta Mesa Project is a fully licensed, permitted and constructed ISR processing facility that has an operating capacity of 1.5 
million pounds of uranium per year and comprises 195,501 contiguous acres of land. The Alta Mesa Project is currently on standby 
and ready to resume production as market conditions warrant; Alta Mesa is expected to be able to reach commercial production 
levels with limited required capital within approximately twelve months of a production decision.  See “The Alta Mesa Project” 
under Item 2 below. 

Conventional Operations 

The Company conducts its conventional uranium extraction and recovery activities through its White Mesa Mill, which is the only 
operating conventional uranium and vanadium processing facility in the United States. The White Mesa Mill, located near Blanding 
Utah, is centrally located such that it can be fed by a number of the Company’s uranium, uranium/vanadium and uranium/copper 
projects in Colorado, Utah, Arizona and New Mexico, as well as by ore purchases or toll milling arrangements with third parties 
in the region as market conditions warrant. 

The White Mesa  Mill is a 2,000  ton per day uranium recovery  facility,  which can also  process vanadium as a by-product of 
mineralized material extracted from certain uranium/vanadium properties, and is evaluating recovering copper as a by-product 
from a uranium/copper project in Arizona. In addition, the Mill can recycle other uranium-bearing materials not derived from 
conventional ore, referred to as "alternate feed materials", for the recovery of uranium, alone or in combination with other metals. 

The White Mesa Mill has historically operated on a campaign basis, whereby mineral processing occurs as mill feed, contract 
requirements, and market conditions warrant. Over the years, the Company’s own, and third-party owned, conventional uranium 
properties in Utah, Colorado, Arizona and New Mexico have been both active and on standby, from time-to-time, in response to 
changing market conditions. From 2007 through 2014, running on a campaign basis, the White Mesa Mill recovered on average 
over 1 million pounds of U3O8 per year from conventional sources, including its La Sal Project, Daneros Project, and Tony M 
property in Utah; its Arizona 1 and Pinenut Projects in Arizona; and alternate feed materials. During 2015, the Mill recovered a 
total  of  296,000  lbs.  of  U3O8,  of  which  25,000  pounds  were  recovered  from  conventional  materials  and  the  remainder  from 
processing alternate feed materials (including 72,000 pounds for the account of a third party).  During 2016, the Mill recovered 
a total of 680,000 lbs. of U3O8, of which 433,000 pounds were recovered from conventional materials from the Company's Pinenut 
Project and 248,000 pounds from processing alternate feed materials. During 2017, the Mill recovered 310,000 pounds from 

12 

 
processing pond solutions and 1,000,000 pounds from processing alternate feed materials, of which a total of 360,000 pounds 
were for the Company's account and 950,000 pounds were for the account of third parties. 

The Company’s Pinenut Project, where mineral extraction activities occurred until September 2015, is now depleted, and 
reclamation activities have commenced. The Company continues to receive and process alternate feed materials at the White 
Mesa Mill. At the Company’s permitted Canyon Project, an underground drilling project has been completed, and a new shaft 
was completed in the first quarter of 2018. The timing to extract and process mineralized material from the Canyon Project will 
be based on market conditions, available financing, and sales requirements. All of the Company’s other conventional properties 
and projects are currently in the permitting process or on standby pending improvements in market conditions. No third party 
conventional properties are active at this time. 

The Company also owns the Sheep Mountain Project (the “Sheep Mountain Project”), which is a conventional uranium extraction 
project located in Wyoming. Due to its distance from the White Mesa Mill, the Sheep Mountain Project is not expected to be a 
source  of  feed  material  for  the  Mill. The  Sheep  Mountain  Project  consists  of  permitted  open  pit  and  underground  extraction 
components (the “Sheep Mountain Extraction Operation”) and a planned processing facility to process extracted mineralized 
material (the “Sheep Mountain Processing Operation”), which has not yet been permitted. 

The Company’s principal conventional properties include the following: 

• 

• 

• 

• 

• 

• 

• 

• 

the White Mesa Mill, a 2,000 ton per day uranium and vanadium processing facility, which is also evaluating recovering 
copper as a by-product from the Company's Canyon Project, located near Blanding, Utah, held through the Company’s 
subsidiary EFR White Mesa LLC. See “The White Mesa Mill” under Item 2 below; 
the Arizona Strip uranium properties located in north central Arizona, including: the Canyon Project, which is a fully- 
permitted uranium/copper project with all surface facilities and a new shaft in place (see “The Canyon Project” under 
Item 2 below); the Wate project (the “Wate Project”), which is a uranium deposit in the permitting stage; the Arizona 1 
project (the “Arizona 1 Project”), which is a fully-permitted uranium project on standby; and the EZ properties (“EZ 
Properties”), which are uranium deposits in the exploration and evaluation stage. All of the Company’s Arizona Strip 
properties are held by the Company’s subsidiary EFR Arizona Strip LLC, with the exception of the Wate Project, which 
is  held  by  the  Company’s  subsidiary  Wate  Mining  Company  LLC.  See  “Non-Material  Mineral  Properties  –  Other 
Conventional Projects – Arizona Strip” under Item 2 below; 
the Roca Honda uranium project (the “Roca Honda Project”), which is located near the town of Grants, New Mexico, 
held by the Company’s subsidiaries Strathmore Resources (US), Ltd., and Roca Honda Resources LLC. See “The Roca 
Honda Project” under Item 2 below; 
the Sheep Mountain Project, which is a uranium project located near Jeffrey City, Wyoming, including permitted open 
pit and underground components held by the Company’s subsidiary Energy Fuels Wyoming Inc. See “The Sheep Mountain 
Project” under Item 2 below; 
the Henry Mountains complex of uranium projects (the “Henry Mountains Complex”), located in south central Utah 
near the town of Ticaboo, which is comprised of the Tony M property (the “Tony M Property”) and the Bullfrog property 
(the “Bullfrog Property”), and  which are  held by the  Company’s subsidiary  EFR Henry Mountains LLC. See “The 
Henry Mountains Complex” under Item 2 below; 
the La Sal complex of uranium and uranium/vanadium projects (the “La Sal Project”) (see “The La Sal Project” under 
Item  2  below),  the Whirlwind  uranium/vanadium  project  (the  “Whirlwind  Project”),  and  the  Sage  Plain  uranium/ 
vanadium project (the “Sage Plain Project”), all of which are located near the Colorado/Utah border (the “Colorado 
Plateau”) and, in addition to nearby exploration properties, are held by the Company’s subsidiary EFR Colorado Plateau 
LLC. See “Non-Material Mineral Properties – Other Conventional Projects – Colorado Plateau” under Item 2 below; 
the Daneros uranium project (the “Daneros Project”) located in the White Canyon district in southeastern Utah, which 
is held by the Company’s subsidiary EFR White Canyon Corp. See “The Daneros Project” under Item 2 below; and 
a number of non-core uranium properties, which the Company is evaluating for sale or abandonment, which are held in 
various of the Company’s subsidiaries. See “Non-Material Mineral Properties” under Item 2 below. 

Mineral Exploration 

Energy Fuels holds a number of exploration properties in the Colorado Plateau, White Canyon, Grants, Arizona Strip, and Powder 
River  Basin  Districts.  Energy  Fuels  has  conducted  intermittent  exploration  drilling  on  numerous  projects  in  the  period  from 
February  2007  through December  2013.  Several  of  those  projects  have  been  abandoned  or  sold.  No  exploration drilling  was 
performed in 2014, 2015, 2016 or 2017. See “Non-Material Mineral Properties” under Item 2 below. 

Development of the Business -- Major Transactions over the Past Five Years 

Over the past five years, the Company has completed the following major transactions: 

13 

 
• 

• 

• 

• 

• 
• 

• 

In October 2013, the Company acquired all of the outstanding shares of Strathmore Minerals Corp. Under that transaction, 
the  Company  acquired  a  60%  interest  in the  Roca  Honda Project  as  well  as the  Company’s  100%  interests in  other 
properties and assets, some of which have since been sold. The Roca Honda Project was formerly held in a joint venture 
until the Company acquired full ownership of the project in May 2016 when it purchased Sumitomo Corporation's 40% 
interest in the project. (see “The Roca Honda Project – History” under Item 2 below). The Roca Honda Project and the 
remaining assets acquired in October 2013 are held in the Company’s subsidiary, Strathmore Resources (US), Ltd. 
In two transactions in 2014, the Company sold its interest in the Pinon Ridge uranium/vanadium mill project, which is 
located in western Colorado, that the Company had previously planned to develop, along with a number of other non- 
core uranium properties; 
In June  2015,  the Company  acquired all of  the outstanding shares of  Uranerz.  Under that transaction, the  Company 
acquired the Nichols Ranch Project, the Hank Project, the Reno Creek Property, the West North Butte Property, the North 
Rolling Pin Property, the Company’s interest in the Arkose Mining Venture, uranium sales contracts, and other assets, as 
well as the shares of Uranerz, which holds those assets; 
In two separate transactions in February and November of 2015, the Company acquired 100% ownership of the Wate 
Project through the acquisition of Wate Mining Company LLC; 
In June 2016, the Company acquired EFR Alta Mesa and its primary asset, the Alta Mesa Project; 
In November 2017, the Company announced that it had entered into an agreement to sell its non-core Reno Creek 
Property to Uranium Energy Corp. (see 2017 Corporate Developments, below); and 
In November 2017, the Company announced that it had entered into an agreement to acquire and extinguish royalties on 
its Nichols Ranch Project as well as acquire and hold royalties on nearby operating and permitting ISR uranium projects 
owned by Cameco Corporation (see 2017 Corporate Developments, below). 

2017 Corporate Developments 

On May 17, 2017, the Board appointed Messrs. Benjamin Eshleman III and Robert W. Kirkwood to serve as Directors of the 
Company pursuant to the Board's power to increase the size of the Board by up to one-third in number between annual meetings 
of shareholders.  Messrs. Glenn Catchpole and Ron Hochstein did not stand for re-election as Directors at the Company's Annual 
General Meeting of Shareholders, and therefore ceased to be Directors effective May 17, 2017. 

Effective June 12, 2017, Ames Brown resigned as a Director of the Company. 

Effective July 1, 2017, the Company appointed Mark S. Chalmers as President and Chief Operating Officer. 

On November 2, 2017, the Company announced that it had entered into an agreement to sell its non-core Reno Creek Property to 
Uranium Energy Corp. ("UEC") for $5.39 million, including $2.94 million of cash and $2.45 million shares of UEC that will be 
priced upon the closing of the transaction.  The Company expects this transaction to be completed in Q1-2018. 

On November 13, 2017, the Company announced that it had entered into an agreement with Excalibur Industries to acquire and 
extinguish royalties on its Nichols Ranch Project as well as acquire and hold royalties on nearby operating and permitted ISR 
uranium projects owned by Cameco for approximately $3.5 million, subject to certain adjustments. This consideration will be 
payable in common shares at closing, which will be priced based on the volume-weighted average price ("VWAP") of Energy 
Fuels' shares on the NYSE American for the five most recent trading days ending on the last trading day prior to closing. Through 
the transaction, the Company will acquire a 6% - 8% sliding-scale gross proceeds production royalty on Energy Fuels' Nichols 
Ranch Project.  This royalty also applies to other properties owned by the Company nearby.  After closing, the Company expects 
to extinguish these royalties.  Energy Fuels is also acquiring the 4% gross proceeds production royalty on Cameco's North Butte/ 
Brown Ranch Project ("North Butte"), the Ruby Ranch Project, and the Greasewood property. North Butte is a fully permitted 
and operational project that has been operated by Cameco as a satellite to their Smith Ranch-Highland ISR Project since 2013. 
This transaction is expected to close in the first half of 2018. 

On December 29, 2017, the Company amended its existing Controlled Equity Offering Sales Agreement with Cantor Fitzgerald 
& Co. (“Cantor”), to extend its ability to sell from time to time at its discretion, through Cantor as agent, common shares by way 
of an “at-the-market” offering (the “ATM”).  Sales of the shares, if any, would occur by means of ordinary brokers’ transactions 
or block trades, with sales only being made on the NYSE American at market prices.  Any decision to undertake sales of common 
shares pursuant to the ATM would be at the Company’s sole discretion. No common shares will be offered or sold through the 
ATM on the TSX.  In connection with the ATM, the Company filed a prospectus supplement to its U.S. registration statement on 
Form S-3 (the “Registration Statement”), qualifying for distribution up to $30 million in common shares under the extended 
ATM. 

Company Strategy 

Energy Fuels intends to continue to strengthen its position as a leading uranium extraction and recovery company in the United 
States. Through the operating White Mesa Mill, the operating Nichols Ranch Project, the standby Alta Mesa Project, our large 

14 

 
uranium  resource  base,  and  existing  conventional  projects  on  standby,  under  construction,  and  in  permitting,  the  Company’s 
strategy is to remain a unique and valuable call option on increases in the price of uranium, with significant scalability in improved 
market conditions. The Company is also pursuing revenue-generating opportunities at its White Mesa  Mill  through potential 
vanadium recovery and land clean-up work. The Company currently intends to maintain its ISR and conventional uranium recovery 
capabilities, its uranium resource base, and its scalability. However, continued weakness in uranium prices; an inability to generate 
sufficient revenues from alternate feed materials, potential land cleanup work and vanadium opportunities; and/or cash needs may 
dictate that the Company engage in further measures to maintain the value of this option. 

As a result of the foregoing, we intend to maintain the value of the Company as a call option on increases in the price of uranium, 
while conserving cash, by engaging in the following activities: 

• 

Produce from existing wellfields (wellfields #1 through #9) at Nichols Ranch and defer further wellfield development at 
Nichols Ranch until uranium prices improve; 

•  Continue alternate feed processing and recovery of uranium from uranium dissolved in the Mill’s ponds, as well as pursue 
additional alternate feed materials and other sources of feed for the Mill, including potential vanadium recovery and 
material generated from land cleanup work; 

• 
•  Complete installation of the sump at the Canyon Project in the first quarter of 2018,  after which time all field activities 
will  have  been  completed. The  Company  plans  to  continue  to  carry  out  engineering,  procurement  and  construction 
management activities in 2018; 

•  Continue evaluating the possibility of recovering copper at the White Mesa Mill as a by-product from the Canyon Project 

and pursue any permitting actions that may be required; 

•  Continue to maintain standby projects and facilities (including the Canyon Project, Alta Mesa Project, the La Sal Project 
and the Daneros Project) in a state of readiness for the purpose of restarting mining activities, as market conditions may 
warrant. At this time, all of the Company’s conventional projects are expected to remain on standby until market conditions 
warrant restarting mining activities, or are in the evaluation or permitting process; 

•  Continue permitting activities for the Roca Honda Project through the end of 2018; 

•  Continue to pursue an appropriate trade remedy that properly recognizes the value of uranium produced in the U.S., as 

proposed in the Petition (see Subsequent Events, below); 

•  Continue  to  evaluate  the  sale  or  abandonment  of  non-core  assets  that  the  Company  does  not  believe  contribute  to 

shareholder value in order to reduce costs and/or receive sales proceeds; and 

•  Continue to pursue additional cost cutting measures. 

Subsequent Events 

On  January  16,  2018,  the  Company  and  Ur-Energy  (the  "Petitioners")  announced  that  they  had  jointly  filed  a  Petition  (the 
"Petition") for Relief with the U.S. Department of Commerce ("DOC") under Section 232 of the Trade Expansion Act of 1962 
(as amended) from Imports of Uranium Products that Threaten U.S. National Security. The Petition describes how uranium and 
nuclear fuel from state-owned and state-subsidized enterprises in Russia, Kazakhstan, Uzbekistan, and China potentially represent a 
threat to U.S. national security. The Petition seeks remedies which  will set a quota to limit imports of uranium into the U.S., 
effectively  reserving  25%  of  the  U.S.  nuclear  market  for  U.S.  uranium  production.  Additionally,  the  Petition  suggests 
implementation of a requirement for U.S. federal utilities and agencies to buy U.S. uranium in accordance with the President's 
Buy American Policy. The remedies proposed by the Petitioners are expected to strengthen the U.S. uranium mining industry, 
bolster national defense, and improve supply diversification for U.S. utilities and their customers. It should be noted, however, 
that there can be no certainty of the outcome of the investigation or the recommendation of the Secretary, and therefore the outcome 
of this process is uncertain. 

On January 31, 2018, Stephen P. Antony retired from his position as Chief Executive Officer and a Director of the Company, and 
on February 1, 2018 Mark S. Chalmers was appointed President and Chief Executive Officer and a Director of the Company. 

On February 14, 2018, Mr. W. Paul Goranson, the former Executive Vice President, Operations, was appointed as Chief 
Operating Officer of the Company, reporting to the President and Chief Executive Officer of the Company, and Mr. Matthew 

15 

 
 
 
 
 
 
 
 
 
 
Tarnowski, the former Controller of the Company, was appointed as Chief Accounting Officer and Controller of the Company, 
reporting to the Chief Financial Officer of the Company. 

On March 1, 2018, Daniel G. Zang resigned from his position as Chief Financial Officer of the Company, and on March 2, 2018, 
Mr.  David  C.  Frydenlund,  the  former  Senior Vice  President,  General  Counsel  and  Corporate  Secretary  of  the  Company,  was 
appointed as Chief Financial Officer, General Counsel and Corporate Secretary of the Company, reporting to the President and 
Chief Executive Officer of the Company. 

On March 8, 2018, the Board appointed Barbara A. Filas as a Director of the Company effective March 12, 2018, to fill the vacancy 
created by the resignation of Mr. Ames Brown from the Board. 

Uranium Sales 

The Company has four existing contracts, which require deliveries of 650,000 pounds of U3O8  in 2018. Of this, a total of 400,000 
pounds of U3O8  is required to be sourced from the Company’s uranium recovery operations, while Energy Fuels has the option to 
fulfill the remaining 250,000 pounds of U3O8 from the Company’s uranium recovery operations and/or open market purchases. 
At December 31, 2017, the Company had approximately 615,000 pounds of finished goods inventory from the Company’s uranium 
recovery operations. 

In 2018, the Company expects to have sufficient existing inventory or uranium recovery to meet all of its commitments to sell 
650,000 pounds of uranium under its existing contracts. 

Of the 650,000 pounds of expected sales in 2018, 50,000 pounds are being sold at $24.75 per pound, 400,000 pounds are being 
sold at a fixed price of $61.30 per pound, and 200,000 pounds are being sold at a 0.5% discount to spot prices in effect at the times 
of delivery.  Additional selective spot sales may be made in 2018 as necessary to generate cash for operations. 

Overview of Uranium Market 

The primary commercial use of uranium is to fuel nuclear power plants for the generation of electricity. All of the uranium extracted 
from Energy Fuels’ projects is expected to be used for this purpose. 

According to the World Nuclear Association (“WNA”), as of January 2018, there are currently 447 operable nuclear reactors 
world-wide, which required approximately 169 million pounds of U3O8 fuel in 2017 at full operation. Worldwide there are currently 
58 new reactors under construction with an additional 157 reactors on order or in the planning stage, and another 351 which have 
been proposed. 

According to data from TradeTech LLC (“TradeTech”), the  world continues  to require  more uranium than it produces  from 
primary extraction, largely due to increasing uranium demands in Asia. The gap between demand and primary supply is filled by 
stockpiled inventories and secondary supplies. 

According to the WNA, the United States currently has 99 operating reactors, two reactors under construction, and another 35 
reactors on order, planned or proposed. According to the Nuclear Energy Institute ("NEI"), the United States produced 
approximately 19.7% of its electricity from nuclear technology and avoided 554 million metric tons of carbon dioxide 
emissions in 2016. According to the U.S. Energy Information Agency (“EIA”), U.S. utilities purchased approximately 56.5 
million pounds of U3O8 in 2016. However, in 2016 the U.S. only produced approximately 2.9 million pounds of U3O8. As a 
result, in 2016, the U.S. fulfilled only about 5% of its demand from domestic primary mine production. According to published 
EIA data, the U.S. produced 2.42 million pounds of U3O8 in 2017, including 1.47 million pounds of mine production and 0.95 
million pounds of previously mined production that was reprocessed at the Company’s White Mesa Mill. 

Uranium is not traded on an open market or organized commodity exchange such as the London Metal Exchange, although the 
New York Mercantile Exchange provides financially-settled uranium futures contracts. Typically, buyers and sellers negotiate 
transactions privately and directly. Spot uranium transactions typically involve deliveries that occur immediately and up to 12 
months in the future. Term uranium transactions typically involve deliveries that occur more than 12 months in the future, with 
long-term transactions involving delivery terms of at least three years. Uranium prices, both spot and term, are published by two 
independent market consulting firms, TradeTech and The Ux Consulting Company (“Ux”), on a weekly and monthly basis.  Other 
brokers, including Numerco Ltd., Uranium Markets LLC, and Evolution Markets Inc., also publish daily broker average uranium 
prices. 

The spot and term prices of uranium are influenced by a number of global factors. For example, both the spot and term prices of 
uranium were negatively impacted by the accident at the Fukushima Daiichi Nuclear Plant in March 2011. The events at Fukushima 
created heightened concerns regarding the safety of nuclear plants and led to both temporary and permanent closures of nuclear 
plants around the world. The Fukushima incident has created downward pressure on uranium prices over the past seven years, 

16 

 
 
 
 
which is still being felt today. In contrast, China is pursuing an aggressive nuclear program, with 38 units now operating, 20 new 
units under construction, 39 units which are planned, and 143 units that have been proposed, according to January 2018 WNA 
data. 

Historically, most nuclear utilities have sought to purchase a portion of their uranium needs through mid- and long-term supply 
contracts, while other portions are bought on the spot market. Like sellers, buyers seek to balance the security of supply with the 
opportunity to take advantage of lower prices caused by volatility in prices. For this reason, both buyers and sellers track current 
spot and term prices for uranium carefully, make considered projections as to future prices, and negotiate with one another on 
transactions which each deems favorable to their respective interests. 

The graph below shows the monthly spot (blue line) and long-term (red line) uranium price from August 1969 until February 
2018 as reported by TradeTech (not adjusted for inflation): 

To give a more recent perspective, the graph below shows the monthly spot (blue line) and long-term (red line) uranium price 
from January 2013 until February 2018 as reported by TradeTech (not adjusted for inflation): 

According to monthly price data from TradeTech, uranium prices during 2017 were up $3.50, or 17% for the year. Monthly spot 
prices began the year at $20.25 per pound of U3O8 on December 31, 2016 and ended the year at $23.75 per pound, reaching a high 
of $24.50 per pound for the month of January 2017 and a low of $19.95 per pound for the month of May 2017. According to Trade 
Tech, the spot price was $22.25 per pound on March 2, 2018. TradeTech price data also indicated that long-term U3O8 prices began 
2017 at $30.00 per pound and ended 2017 at $31.00 per pound. The high long-term price for 2017 was $35.00 per pound for 
February, March, and April, and the low long-term price was $30.00 per pound for September and October.  The long-term price 
at February 28, 2018 was $29.00 per pound. The Company believes the weak uranium markets are the result of excess uranium 
supplies caused by large quantities of secondary uranium extraction and excess inventories, the availability of low-priced spot 
material,  the  delayed  restart  of  Japanese  reactors,  insufficient  production  cut-backs  especially  from  state-owned  and  state- 
subsidized uranium and uranium fuel entities, premature reactor closures, and continued weak uranium demand. 

17 

 
 
 
 
 
 
 
 
Uranium Market Outlook and Uranium Marketing Strategy 

World demand for clean, reliable, and affordable baseload electricity is growing. As a result of the expected growth of nuclear 
energy, the Company believes the long-term fundamentals of the uranium industry remain positive. The Company believes prices 
must rise to higher levels to support the new primary production that will be required to meet the increasing demand we expect 
to see as more nuclear units are constructed around the world. According to TradeTech, world uranium requirements continue to 
exceed primary mine production, with the gap being bridged by secondary supplies and excess uranium inventories in various 
forms that have already been mined. In addition, it is the Company's belief that additional mine production cutbacks will be required 
to bring the market into balance in the short and medium terms. However, a large portion of global uranium production is state- 
owned and state-subsidized, and therefore not subject to normal market fundamentals. It is for this reason that the Company and 
Ur-Energy submitted the Petition to the U.S. Department of Commerce to initiate an investigation into the effects of uranium 
imports on U.S. national security. The Petitioners have proposed a quota system that limits uranium and uranium fuel imports, 
effectively reserving 25% of the U.S. nuclear market for U.S. uranium producers. At the current time, less than 5% of U.S. reactor 
demand is met by new production from U.S. uranium mines. The Company has believed for several years that uranium prices, 
and long-term contracting levels in particular, will need to rise to levels that are sufficient to incentivize new mine production. 
However, it is the Company's belief that non free-market forces have delayed this recovery. The Petition is intended to help address 
this situation. 

The Company believes prices likely hit a bottom in 2016, and despite considerable market uncertainty in 2017, the lows of 2016 
were not repeated in 2017. In January 2017, it was announced that Kazakhstan would reduce 2017 uranium production by 10% 
(5  million+  lbs.)  after  several  years  of  production  increases.  In  November  2017,  Cameco  announced  that  it  was  temporarily 
suspending production from its McArthur River/Key Lake project for 10 months, which is among the largest and lowest cost 
uranium production facilities in the world. According to Royal Bank of Canada, this is expected to remove 17-18 million pounds 
of uranium production during 2018. If the suspension is extended, even more uranium will be removed from the market. In addition, 
in  December  2017,  Kazakhstan's  state-owned  uranium  mining  enterprise,  Kazatomprom,  announced  further  production  cuts 
amounting  to  a  total  of  28.6  million  pounds  of  uranium  during  2018-2020.  Although  subsequent  announcements  by  Kazakh 
government officials have put some doubt into the true scale of these cutbacks, it is the Company's belief that cuts to production 
in Kazakhstan will occur but not at the levels stated in the December 2017 announcement. On a longer-term basis, according to 
data from TradeTech and the WNA, Chinese utilities continue to aggressively build new reactors. In addition to China, according 
to the WNA, there are large numbers of new reactors under construction and in various stages of planning around the world. 

In the short- and medium-terms, market challenges remain. The world continues to be oversupplied with uranium, mainly due to 
large quantities of secondary and other inelastic uranium supplies (including enricher underfeeding and state-owned and state- 
subsidized uranium and nuclear fuel production), high levels of excess inventories, insufficient producer cut-backs, premature 
reactor shutdowns, delays in new reactor construction, two large new mines coming into production (Cigar Lake and Husab), and 
decreased demand due to Japanese reactors remaining offline for longer than expected. Though it should be noted that Husab 
continues to experience start-up delays and its 2.2 million lbs. of uranium production in 2017 did not meet TradeTech's forecast 
of 4 million lbs. In addition, conflicting announcements on the scale of Kazakh production cuts in 2018-2020 and the filing of the 
Petition by the Company and Ur-Energy may be causing some market participants to take a wait-and-see approach in the short- 
term. There remains a great deal of uncertainty in uranium prices regarding the timing and level of the recovery, as fundamental, 
political, technical, and other factors could cause prices to be significantly above or below currently expected ranges. 

Nevertheless, according to data from Trade Tech, global utilities have nearly 600 million lbs. of uncovered uranium requirements 
through 2025, which the Company expects will increase levels of market activity at some point in the future. 

The Company’s marketing strategy is to seek a base of earnings and cash flow through sales of a portion of its uranium into term 
contracts,  to  the extent such  contracts are  available at  satisfactory prices. To  gain  exposure to  increasing uranium prices,  the 
Company seeks to sell a portion of its planned uranium extraction into contracts with market-related formulas, if available at 
satisfactory prices, and through future spot and term sales. Further exposure to increasing uranium prices can be generated through 
the Company’s ability to bring additional uranium extraction online in the future in response to increasing prices, which can be 
sold on a market-related or fixed basis at then prevailing prices. 

During 2017, the pricing on all of the Company’s contracts, other than the spot contract referenced above, were at their floors or 
at prices fixed by the contract. During 2017, the Company sold 520,000 pounds of U3O8 at a weighted- average price of $47.05 
per pound. This included 320,000 pounds of sales under contracts at a weighted average price of $62.72 per pound and 200,000 
pounds into contracts based on spot market prices at a weighted average price of $21.99 per pound. 

In 2018, the Company expects to sell a total of 650,000 pounds of U3O8  into its four existing contracts at pricing expected to 
average approximately $48.00 per pound based on the fixed prices contained in three of the contracts and current forecasts of spot 
prices and price inflation in the other contract. In Q1-2018 the Company amended its remaining long-term contracts with one 
customer, so that all remaining deliveries of 400,000 lbs. under the contracts will occur in April 2018 at a fixed price of $61.30 

18 

 
per pound; including moving 200,000 lbs. of deliveries originally scheduled for 2019 and 2020 up to April 2018. The Company 
also has a contract for the delivery of 50,000 lbs. in Q1-2018 at a fixed price of $24.75 per pound and a contract for the delivery 
of 200,000 lbs. in 2018 with pricing at a 0.5% discount to the spot price at the time of delivery. Additional selective spot sales 
may be made in 2018 as necessary to generate cash for operations. As a result of these amendments, the Company will have no 
further long-term contractual obligations following its 2018 deliveries. All uranium sales after 2018 will therefore be at spot prices 
and unhedged, unless the Company enters into new long-term contracts at satisfactory prices in the future. 

The Vanadium Market 

The White Mesa Mill has historically recovered vanadium as a by-product of uranium from certain of its properties on the Colorado 
Plateau, most notably from the La Sal Project, as well as from properties owned by third-parties on the Colorado Plateau through 
toll milling and similar arrangements, when the price of vanadium has been high enough to justify its recovery. The Mill’s most 
recent vanadium recovery occurred in 2013 when it recovered 1.5 million pounds of vanadium. 

Vanadium is a metallic element that, when converted into ferrovanadium ("FeV") (an alloy of vanadium and iron), is used primarily 
as an additive to strengthen and harden steel. According to market consultant Roskill, over 90% of FeV is used in the steel industry. 
In addition, vanadium continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is 
the largest global producer of vanadium, accounting for roughly 44% of production in 2016 with additional production coming 
from Russia, South Africa, and Brazil (Roskill). Vanadium (as V2O5) prices were up sharply in 2017, beginning the year at $5.03 
per pound, and ending the  year at $9.75 per pound, reaching a high of $11.13 per pound in September 2017 (Metal Bulletin 
information received from the U.S. DOE). Vanadium prices are currently at $14.25 per pound. 

According to Roskill, prices have risen primarily as a result of tightening supplies in China, including the shutdown of vanadium 
producing facilities for environmental reasons. In addition, the closure of the Evraz Highveld facility in South Africa has added 
to market tightness (Roskill). On the demand side, increasingly stringent building requirements, particularly in China, are requiring 
the use of rebar that contains vanadium (Roskill). 

In the past, Energy Fuels has sold its vanadium both as V2O5  and as ferrovanadium (“FeV”) through spot sales to industry end- 
users and trading companies. No vanadium has been recovered or sold by the Company since 2013. The Company is currently 
evaluating certain opportunities in the vanadium space, including the potential to recover vanadium dissolved in the ponds at the 
White Mesa Mill, re-opening mines that contain vanadium resources, and/or recovering vanadium from non-ore sources. 

The Copper Market 

The White Mesa  Mill has not produced copper. Due to the discovery of significant quantities of copper mineralization at the 
Canyon Project, the Company is investigating potential alternatives for recovering copper as a byproduct of uranium recovery at 
the White Mesa Mill. 

Copper is a malleable and ductile metallic element that has a number of industrial uses, including as a conductor of heat and 
electricity, as a building material, in industrial machinery, and as a component of certain metal alloys. According to the International 
Copper Study Group ("ICSG"), an intergovernmental organization that operates as the international commodity board for copper, 
the major product categories of the copper trade are: copper concentrates, copper blister and anode, refined copper cathode and 
ingots, copper scrap, copper semis, and a small amount of copper powders and compounds. Copper is mainly shipped by producers 
to fabricators as cathode, wire rod, billet, cake (slab), or ingot. Two of the key components of the copper market are the spot price 
(settlement price for a transaction today) and the future price. A futures or option contract defines the price of the delivery, the 
quantity of the product, the delivery date(s), and delivery location(s) and other aspects. Three main commodity exchanges provide 
the facilities to trade copper: the London Metal Exchange (LME), Commodity Exchange Division of the New York Mercantile 
Exchange (COMEX/NYMEX), and the Shanghai Futures Exchange (SHFE). 

According to the United States Geological Survey ("USGS"), the top global primary copper producers in 2016 were Chile, Peru, 
China, the United States, and Australia. In 2016, the U.S. had 24 mines that recovered copper with the top copper producing states 
being Arizona, New Mexico, Utah, Nevada, and Montana. In addition in 2016, the U.S. had three primary smelters, three electrolytic 
and four fire refineries, and fifteen electrowinning facilities that operated. According to Mining.com, the top copper producing 
companies globally are Codelco, Freeport-McMoRan, Glencore International, BHP Billiton, and Southern Copper. In addition to 
primary mining, recycling is also a significant source of copper, and recycled copper is indistinguishable from primary copper 
(ICSG). According to Investopedia, the price of copper is driven by a number of factors including strength and weakness in the 
U.S. dollar, oil prices, global demand, including China, the cost of production, labor relations, natural disasters/phenomena, and 
geopolitical events. The spot price of copper rose by approximately 28% during 2017 (London Metal Exchange). According to 
Goldman Sachs, the price of copper rose in 2017 primarily due to currency effects, global growth, and demand factors. Copper 
prices are currently at $3.08 per pound. 

Competition 

19 

 
The uranium industry is highly competitive. The Company competes with mining and exploration companies for uranium sales, 
the acquisition of uranium mineral properties, and the procurement of equipment, materials and personnel necessary to explore, 
develop, and extract uranium from such properties. There is competition for a limited number of uranium acquisition opportunities, 
including competition with other companies having substantially greater financial resources, staff and facilities than the Company. 
As a result, the Company may encounter challenges in acquiring attractive properties, and exploring and advancing properties 
currently in the Company’s portfolio. In addition, Energy Fuels competes with other uranium recovery companies, along with 
traders, brokers, financial institutions, converters, enrichers, and other market actors, including some that are state-owned and 
state-subsidized, for uranium sales. Due to the Company’s limited capital and personnel and the relative size of its operations, the 
Company may be at a competitive disadvantage compared to some other companies with regard to exploration and, if warranted, 
development of  mining properties and securing uranium sales. The Company believes that competition for acquiring mineral 
prospects and completing uranium sales will continue to be intense in the future. 

The availability of funds for exploration, evaluation, permitting and construction of uranium projects is limited, and the Company 
may find it difficult to compete with larger and more established uranium exploration and production companies for capital. The 
Company’s inability to continue exploration, advancement, and the acquisition of new properties due to lack of funding could 
have a material adverse effect on the Company’s future operations and financial position. 

Government Regulation 

The Company’s properties and facilities are subject to extensive laws and regulations which are overseen and enforced by multiple 
federal, state and local authorities. These laws govern exploration, construction, extraction, recovery, processing, exports, various 
taxes, labor standards, occupational health and safety, waste disposal, protection and remediation of the environment, protection 
of endangered and protected species, toxic and hazardous substances, and other matters. Uranium minerals exploration, extraction, 
recovery,  and  processing  are  also  subject  to  risks  and  liabilities  associated  with  the  perceived  potential  for  pollution  of  the 
environment and disposal of waste products occurring as a result of such activities. 

Compliance with these laws  and regulations  may impose substantial costs on the Company and will subject the Company to 
significant potential liabilities. Changes in these regulations could require the Company to expend significant resources to comply 
with new laws or regulations or changes to current requirements and could have a material adverse  effect on the Company’s 
business operations. 

Environmental Regulations 

Exploration, development, and extraction activities are subject to certain environmental regulations which may prevent or delay 
the continuance of our activities. In general, our exploration, evaluation, and extraction activities are subject to certain federal and 
state laws and regulations relating to environmental quality and pollution control. Such laws and regulations increase the costs of 
these activities and may prevent or delay the commencement or continuance of a given operation. Specifically, we are subject to 
legislation regarding emissions into the environment, water discharges, and storage and disposition of hazardous wastes. In addition, 
legislation has been enacted which requires facility sites to be reclaimed in accordance with such legislation. Compliance with 
these laws and regulations has not had a material effect on our operations or financial condition to date. 

Uranium milling in the U.S. is primarily regulated by the United States Nuclear Regulatory Commission (the “NRC”) pursuant 
to the Atomic Energy Act of 1954, as amended. Its primary function is to ensure the protection of employees, the public, and the 
environment from radioactive materials, and it also regulates most aspects of the uranium recovery process. The NRC regulations 
pertaining to uranium recovery facilities are codified in Title 10 of the Code of Federal Regulations. 

On August 16, 2004, the State of Utah became an Agreement State for the regulation of uranium mills. This means that the primary 
regulator for the White Mesa Mill is now the State of Utah Department of Environmental Quality (“UDEQ”) rather than the NRC. 
At that time, the Mill’s NRC Source Material License was transferred to the State of Utah and became a Radioactive Materials 
License, which was recently renewed in January 2018. The State of Utah incorporates, through its own regulations or by reference, 
all aspects of Title 10 pertaining to uranium recovery facilities. When the State of Utah became an Agreement State, it required 
that a Groundwater Discharge Permit (“GWDP”) be put in place for the White Mesa Mill. The GWDP is required for all similar 
facilities in the State of Utah, and specifically tailors the implementation of the state groundwater regulations to the Mill site. The 
State of Utah requires that every operating uranium mill have a GWDP, regardless of whether or not the facility discharges to 
groundwater. The GWDP for the Mill was finalized and implemented in March 2005 and recently renewed in January 2018. The 
White Mesa Mill also maintains a permit approval for air emissions with the UDEQ, Division of Air Quality. 

20 

 
Conventional  uranium  extraction  is  subject  to regulation  by  a  number  of  agencies  including:  (1)  local  county and  municipal 
government  agencies;  (2)  the  applicable  state  divisions  responsible  for  mining  and  protecting  the  environment  within  Utah, 
Colorado, Arizona, New Mexico, Texas and Wyoming; (3) the BLM and the United States Forest Service (the “USFS”) on public 
lands under their jurisdiction; (4) the U.S. Mine Safety and Health Administration (“MSHA”); (5) the United States Environmental 
Protection Agency (the “EPA”) for radon emissions from underground mines; and (6) other federal agencies (e.g., U.S. Fish and 
Wildlife Service, U.S. Army Corp. of Engineers, and DOE), where certain conditions exist. In addition, a uranium processing 
facility  at  the  Sheep Mountain  Project  will  be  subject  to  regulation  under  the  NRC,  as  a  uranium  processing  facility  and  for 
permanent disposal of the resulting tailings. 

The provisions of the Atomic Energy Act and its regulations that are applicable to uranium milling also apply to our ISR facilities 
in Wyoming and Texas. The Nichols Ranch Project and the Alta Mesa Project each have a Source Material license. The Nichols 
Ranch Source Material License was issued by the NRC. However, because Texas is an Agreement State, the Alta Mesa Source 
Material License was issued by the Texas Commission on Environmental Quality. ISR facilities are also regulated by the State of 
Wyoming and State of Texas, respectively, and the EPA under the Clean Water Act, the Clean Air Act and the Resource Conservation 
and Recovery Act. In addition, ISR wellfields require an Underground Injection Control Permit under the Safe Drinking Water 
Act,  as  administered  by  the  EPA.  ISR  operations  are  subject  to  regulations  by  the  U.S.  Occupational,  Safety  and  Health 
Administration (“OSHA”), rather than MSHA. 

Reclamation bonds or the equivalent  have been posted  for each of the Company’s  material properties that  have structures or 
facilities. 

Energy Fuels is required to have export licenses issued by the NRC for its uranium exports. Such licenses are obtained by the 
Company as required. 

Land Tenure 

The Company’s land holdings are held either by leases from the fee simple owners (private parties or the State) or unpatented 
mining claims located on property owned and managed by the U.S. Federal Government. Annual fees must be paid to maintain 
unpatented mining claims, but work expenditures are not required. Holders of unpatented mining claims are generally granted 
surface access to conduct mineral exploration and extraction activities. However, additional permits and plans are generally required 
prior to conducting exploration or mining activities on such claims. 

On July 9, 2009, BLM issued a Notice of Proposed Withdrawal (“2009 Notice”) under which it proposed that a total of approximately 
one million acres of public lands around the Grand Canyon National Park be withdrawn from location and entry under the Mining 
Law of 1872 (the “Mining Law”), subject to valid existing rights. In the 2009 Notice, BLM stated that the purpose of the withdrawal, 
if determined to be appropriate, would be to protect the Grand Canyon watershed from any adverse effects of locatable hardrock 
mineral exploration and mining. The 2009 Notice segregated the lands from location and entry under the mining laws for up to 
two years to allow time for various studies and analyses, including appropriate NEPA analysis. In order to allow more time for 
BLM to complete its NEPA analysis, the U.S. Department of the Interior (the “DOI”) published Public Land Order 7773 on June 
21, 2011, which effected a six-month emergency withdrawal of the area. The emergency withdrawal prevented the lands from 
being open to location and entry under the Mining Law upon expiration of the two-year segregation while the DOI completed the 
decision–making process on the proposed withdrawal. The emergency withdrawal was effective July 21, 2011 to January 20, 2012. 
During the two-year segregation and six month emergency withdrawal, the BLM, along with its cooperating agencies, completed 
various studies and analyses of resources in the withdrawal area, including an EIS under NEPA. These studies and analyses were 
undertaken to provide the basis for the final decision regarding whether or not to proceed with the proposed withdrawal or to select 
an alternative action. Based on this analysis, on January 9, 2012, the DOI announced its final decision to withdraw from location 
and entry under the Mining Law, subject to valid existing rights, the total of approximately one million acres of lands originally 
proposed in the 2009 Notice (the “Withdrawn Lands”), for a 20-year period. Lawsuits challenging this decision were filed by 
various industry groups and interested parties. 

No new mining claims may be filed on the Withdrawn Lands and no new Plans of Operations may be approved, other than Plans 
of Operations on mining claims that were valid at the time of withdrawal and that remain valid at the time of plan approval. 
Whether or not a mining claim is valid must be determined by a mineral examination conducted by BLM or USFS, as applicable. 
The mineral examination, which involves an economic evaluation of a project, must demonstrate the existence of a locatable 
mineral resource and that the mineral resource constitutes the discovery of a valuable mineral deposit. 

21 

 
All of the Company’s properties located on the Arizona Strip, with the exception of its Wate property and certain exploration 
properties held by the Company’s subsidiary, Arizona Strip Partners LLC, are located within the Withdrawn Lands. A mineral 
examination on the Company’s EZ Project will need to be completed by BLM, in conjunction with its review of the Company’s 
proposed Plan of Operations for that project. Mineral examinations were not required for the Company’s Arizona 1 and Pinenut 
projects, which had previously approved Plans of Operations and were recently active. Although the Company’s Canyon Project 
also has an approved Plan of Operation, and a mineral examination is not required, the USFS performed a mineral examination 
on that project in 2012 and concluded that the Canyon Project’s claims constitute valid existing rights. The USFS also concluded 
that no additional approvals are required on the Canyon Project. 

The Company believes that all of its material projects within the Withdrawn Lands are on valid mining claims that will each 
withstand a mineral examination. However, market conditions may postpone or prevent the performance of mineral examinations 
on certain properties and, if a mineral examination is performed on a property, there can be no guarantee that the mineral examination 
would not result in one of more of the Company’s mining claims being considered invalid, which could prevent a project from 
proceeding. 

Further, there have been efforts to create a National Monument on the Withdrawn Lands, and additional lands, near the Grand 
Canyon National Park. These efforts have included proposed legislation which was introduced in Congress and lobbying of the 
President of the United States to create a National Monument utilizing his executive powers under the Antiquities Act of 1906. 
However, in December 2016, President Obama decided not to grant monument status to the 1.7 million acres proposed for inclusion. 

In addition, President Obama designated the Bears Ears National Monument by executive order in December of 2016, which 
comprised 1.35 million acres of land in San Juan County, Utah. The designated land included a portion of the County road which 
the Company relies on for access to its Daneros Project as well as abutted a portion of the property boundary of the White Mesa 
Mill and encompassed two water sampling sites the Company monitors for the Mill. In December, 2017, President Trump issued 
a Proclamation that amended President Obama’s 2016 Proclamation and reduced the monument to two parcels encompassing a 
total of 201,876 acres, releasing 1.15 million acres. That Proclamation has been challenged in Federal Court. The closest boundaries 
of the reduced monument to any of the Company’s operations are respectively approximately 6 miles from the White Mesa Mill 
and approximately 15 miles from the Daneros Project. It is possible that the Daneros Project and/or the White Mesa Mill could 
become subject to additional requirements, restrictions and costs if the original designation is upheld in Court. 

Employees 

As of the date of this Annual Report, the Company and its subsidiaries have approximately 117 full-time employees. We operate 
in established mining areas where we have found sufficient available personnel for our business plans. 

Available Information 

Detailed information about us is or will be contained in our annual reports on Form 10-K, current reports on Form 8-K, proxy 
statements and other reports, and amendments to those reports, that we file with or furnish to the SEC. Prior to January 1, 2016, 
we were a foreign private issuer subject to limited periodic disclosure and current reporting requirements of the United States 
Securities Exchange Act of 1934, as amended (the “Exchange Act”), so we did not file Forms 10-K or 10-Q prior to January 2016. 
These reports, filed after January 1, 2016, are now available free of charge on our website, www.energyfuels.com, as soon as 
reasonably practicable after we electronically file such reports with or furnish such reports to the SEC. However, our website and 
any contents thereof should not be considered to be incorporated by reference into this document. We will furnish copies of such 
reports free of charge upon written request to our Investor Relations department. You can contact our Investor Relations department 
at: 

Energy Fuels Inc. 

225 Union Blvd., Suite 600 

Lakewood, Colorado, 80228 

Tel: 303.974.2140 

Fax: 303.974.2141 

Toll Free: 1.888.864.2125 

E-mail: investorinfo@energyfuels.com 

Additionally, our Code of Ethics, Audit Committee Charter, and certain Company policies are available on our website. We will 
furnish copies of such information free of charge upon written request to our Investor Relations department. 

22 

 
ITEM 1A. RISK FACTORS 

Our failure to successfully address any of the risks and uncertainties described below could have a material adverse effect on our 
business, financial condition and/or results of operations, and the trading price of our Common Shares may fluctuate widely. We 
cannot assure you that we will successfully address these risks or other unknown risks that may affect our business. 

The following information pertains to the outlook and conditions currently known to Energy Fuels that could have a material 
impact on the financial condition of Energy Fuels. Other factors may arise in the future that are currently not foreseen by management 
of Energy Fuels that may present additional risks in the future. Current and prospective security holders of Energy Fuels should 
carefully consider these risk factors. 

We are subject to the risks normally encountered by Companies in the mineral extraction industry. 

We are subject to the risks normally encountered by companies in the mineral extraction industry, such as: 

• 
• 
• 
• 
• 
• 
• 
• 

the discovery of unusual, or unexpected geological formations; 
accidental fires, floods, earthquakes, volcanic eruptions, and other natural disasters; 
unplanned power outages and water shortages; 
controlling water and other similar mining hazards; 
operating labor disruptions and labor disputes; 
the ability to obtain suitable or adequate machinery, equipment, or labor; 
our liability for potential pollution or other hazards; and 
other known and unknown risks involved in the conduct of exploration, development, and operation of mines, 
extraction and recovery facilities, and mills, along with the market for uranium. 

The development of mineral properties is affected by many factors, including, but not limited to: the cost of operations; variations 
in the grade of mineralized material; fluctuations in metal markets; costs of extraction and processing equipment; availability of 
equipment and labor; labor costs and possible labor strikes; government regulations, including without limitation, regulations 
relating to taxes, royalties, allowable extraction or production, importing and exporting of minerals; foreign exchange; employment; 
worker safety; transportation; and environmental protection. 

Our results of operations are significantly affected by the market price of uranium, vanadium and copper, which are cyclical 
and subject to substantial price fluctuations. 

Our earnings and operating cash flow are and will be particularly sensitive to the long and short term changes in the market price 
of uranium, vanadium and copper. Among other factors, these prices also affect the value of our resources, reserves, and inventories, 
as well as the market price of our Common Shares. 

Market prices are affected by numerous factors beyond our control. With respect to uranium, such factors include, among others: 
demand for nuclear power; political and economic conditions in uranium producing and consuming countries; public and political 
response to a nuclear incident; reprocessing of used reactor fuel, the re-enrichment of depleted uranium tails and the enricher 
practice of underfeeding; sales of excess civilian and military inventories (including from the dismantling of nuclear weapons; 
the premature decommissioning of nuclear power plants; and from the build-up of Japanese utility uranium inventories as a result 
of the Fukushima incident) by governments and industry participants; uranium supply, including the supply from other secondary 
sources; and production levels and costs of production. With respect to vanadium, such factors include, among others: demand 
for steel; the potential for vanadium to be used in advanced battery technologies; political and economic conditions in vanadium 
producing and consuming countries; world production levels; and costs of production. 

With respect to copper, such factors include, among others: emerging market demand and urbanization in countries such as China, 
with associated increases in construction activity; the strength of the homebuilding industry, generally; the use of substitutes, such 
as aluminum for power cables, electrical equipment, automobile radiators and cooling tubes; supply disruptions, such as labor 
disputes at major producing mines or natural disasters; and oil prices, which can impact the cost of energy required to recover 
copper. 

Other factors relating to the price of uranium, vanadium and copper include: levels of supply and demand for a broad range of 
industrial products; substitution of new or different products in critical applications for our existing products; expectations with 
respect to the rate of inflation; the relative strength of the US dollar and of certain other currencies; interest rates; global or regional 
political or economic crises; regional and global economic conditions; and sales of uranium, vanadium and copper by holders in 
response to such factors. If prices are below our cash costs of extraction or recovery and remain at such levels for any sustained 
period, we may determine that it is not economically feasible to continue commercial extraction or recovery at any or all of our 
projects or other facilities and may also be required to look for alternatives other than cash flow to maintain our liquidity until 

23 

 
prices recover. Our expected levels of uranium recovery and business activity are dependent on our expectation and the industry’s 
expectations of uranium, vanadium and copper prices, which may not be realized or may change. In the event we conclude that a 
significant  deterioration  in  expected  future  uranium  prices  has  occurred,  we  will  assess  whether  an  impairment  allowance  is 
necessary which, if required, could be material. 

The recent fluctuations in the price of many commodities is an example of a situation over which we have no control and which 
could materially adversely affect us in a manner for which we may not be able to compensate. There can be no assurance that the 
price of any minerals recovered from our properties will be such that any deposits can be operated at a profit. 

Our profitability is directly related to the market price of uranium, vanadium and copper recovered. We may from time to time 
undertake commodity and currency hedging programs, with the intention of maintaining adequate cash flows and profitability to 
contribute to the long term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, 
we have sufficient assets and recovery to support forward sale arrangements, and forward sale arrangements are available on 
suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product 
to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient 
product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward 
sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices 
that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may 
employ various pricing  mechanisms  within our sales contracts to manage our exposure to price fluctuations, there can be no 
assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into term contracts 
for future sales of uranium, vanadium or copper at prices or in quantities that would allow us to successfully manage our exposure 
to price fluctuations. 

Our properties do not contain mineral reserves under SEC Industry Guide 7, and many of the Company’s properties, projects, 
and facilities are not economic at today’s commodity prices. 

Our properties do not contain any mineral reserves under SEC Industry Guide 7. See “Cautionary Note to United States Investors 
Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates,” above. At current uranium and vanadium prices, 
many of our properties, projects, and facilities are not economic for uranium, and for some properties uranium and/or vanadium, 
extraction, recovery, or processing. At our Canyon Project, we are currently evaluating the possibility of recovering copper as a 
by-product along with uranium and the impact of any recovered copper on the economics of that project at current uranium prices. 
We intend to continue to hold, and in certain cases advance, a number of those properties, projects, and facilities in anticipation 
of possible future increases in the prices of uranium and/or vanadium, as the case may be. However, there can be no assurance 
that uranium and/or vanadium prices will ever, or within a reasonable time period, increase to the levels required to advance those 
properties or, in the case of projects or facilities on standby, to resume exploration, extraction, recovery, or processing activities 
at those projects or facilities. Similarly, there can be no assurance that the value of any copper recovered as a by-product at the 
Canyon Project will be sufficient to advance that project without increases in the price of uranium and/or copper. We continue to 
hold such properties, projects, and facilities because we believe that uranium and/or vanadium prices are likely to rise to such 
levels within a reasonable time period and that the Company will be able to demonstrate a significant copper credit at the Canyon 
Project, and the ability to maintain scalability as commodity prices increase is a key component of our business strategy. However, 
as there is a cost associated with holding and in some cases maintaining on standby such properties, projects, or facilities, we 
continuously evaluate, on a case-by-case basis, such costs against the prospects for price increases, and may from time to time 
sell, drop or reclaim any such properties, projects, or facilities. We have currently identified a number of non-core properties and 
projects that we may sell, drop, or reclaim depending on current market conditions. 

The White Mesa Mill has historically been run on a campaign basis as sufficient feed materials are available, and there can 
be no assurance that sufficient mill feed will be available in the future to sustain future campaigns. 

The White Mesa Mill has historically operated on a campaign basis, whereby mineral processing occurs as mill feed, cash needs, 
contract requirements, and/or market conditions may warrant. Each milling campaign is subject to receipt of sufficient mill feed 
that would allow us to operate the Mill on a profitable basis and/or recover a portion of its standby costs. 

At current uranium and vanadium prices, all of our permitted conventional properties are on standby and our other conventional 
properties  are  either  in  the  evaluation  and  permitting  phase  or  inactive.  Further,  at  these  commodity  prices,  no  third  party 
conventional properties are operating to provide mill feed. In times of depressed commodity prices, when conventional mine 
production is on standby, the Mill has relied primarily on processing alternate feed materials. The Mill continuously seeks to 
identify and secure  additional alternate feed  materials and  other  sources of  mill  feed, such  as  materials from  the clean-up of 
abandoned uranium mine sites. However, there can be no assurance that sufficient conventional ores, alternate feed materials and/ 
or other sources of mill feed will be available in the future that would allow us to operate the White Mesa Mill on a profitable 
basis and/or recover a portion of the Mill’s standby costs at any time. 

24 

 
We have entered into term sales contracts for a portion of our recovered uranium, and there can be no guarantee that we will 
be able to extend the terms of those contracts or enter into new term sales contracts in the future on suitable terms and conditions. 

The Company has entered into term sales contracts for a portion of our recovered uranium, which have historically resulted in 
uranium sales at prices in excess of spot prices. Those contracts have fixed delivery terms, and all of the Company’s existing long- 
term sales contracts will expire following the Company’s April 1, 2018 deliveries.  As a result, all uranium sales after April 1, 
2018 will be required to be made at spot prices and will be unhedged, unless the Company enters into new long-term contracts at 
satisfactory prices in the future. There can be no guarantee that the Company will be able to enter into long-term contracts for the 
delivery of a sufficient amount of uranium at satisfactory prices in the future. The failure to enter into new term sales contracts 
on suitable terms, would be expected to adversely impact our operations and mining activity decisions, and resulting cash flows 
and income. 

We are subject to global economic risks. 

In the event of a general economic downturn or a recession, there can be no assurance that our business, financial condition, and 
results of operations would not be materially adversely affected. During the past several years, the global economy faced a number 
of  challenges.  During  the  global  financial  crisis  of  2007-8  economic  problems  in  the  United  States  and  Eurozone  caused 
deterioration in the global economy, as numerous commercial and financial enterprises either went into bankruptcy or creditor 
protection or had to be rescued by governmental authorities. Access to public financing was negatively impacted by sub-prime 
mortgage defaults in the United States, the liquidity crisis affecting the asset-backed commercial paper and collateralized debt 
obligation markets, and massive investment losses by banks with resultant recapitalization efforts. These types of challenges can 
impact commodity prices, including uranium, vanadium and copper, as well as currencies and global debt and stock markets. 

These types of challenges may impact our ability to obtain equity, debt, or other financing on terms commercially reasonable to 
us, or at all. Additionally, these types of factors, as well as other related factors, may cause decreases in asset values that are deemed 
to be other than temporary, which may result in impairment losses. If these types of challenges occur, or if there is a material 
deterioration in general business and economic conditions, our operations could be adversely impacted and the trading price of 
our securities could be adversely affected. 

The price of our Common Shares is subject to volatility. 

Securities of mining companies have experienced substantial volatility and downward pressure in the recent past, often based on 
factors unrelated to the financial performance  or prospects of the companies involved. These factors include macroeconomic 
conditions in North America and globally, and market perceptions of the attractiveness of particular industries. The price of our 
securities is also likely to be significantly affected by short-term changes in uranium, vanadium and copper prices, changes in 
industry forecasts of uranium, vanadium and copper prices, other mineral prices including oil and natural gas, currency exchange 
fluctuation, or in our financial condition or results of operations as reflected in our periodic earnings reports. Other factors unrelated 
to our performance that may have an effect on the price of our securities include the following: the extent of research coverage 
available to investors concerning our business may be limited if investment banks with research capabilities do not follow our 
securities; lessening in trading volume and general market interest in our securities may affect an investor's ability to trade significant 
numbers of our securities; the size of our public float and the exclusion from market indices may limit the ability of some institutions 
to invest in our securities; and a substantial decline in the price of our securities that persists for a significant period of time could 
cause our securities to be delisted from an exchange, further reducing market liquidity. Our exclusion from certain market indices 
may reduce market liquidity or the price of our securities. If an active market for our securities does not continue, the liquidity of 
an investor's investment may be limited and the price of our securities may decline. If an active market does not exist, investors 
may lose their entire investment. As a result of any of these factors, the market price of our securities at any given point in time 
may not accurately reflect our long-term value. Securities class-action litigation often has been brought against companies in 
periods of volatility in the market price of their securities, and following major corporate transactions or mergers and acquisitions. 
We may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert 
management's attention and resources. 

Exploration, development, extraction, mining, recovery and milling of minerals, and the transportation and handling of the 
products recovered, are subject to extensive federal, state and local laws and regulations. 

These regulations govern, among other things; acquisition of the property or mineral interests; maintenance of claims; tenure; 
expropriation;  prospecting;  exploration;  development;  construction;  extraction  and  mining;  recovery,  processing,  milling  and 
production;  price  controls;  exports;  imports;  taxes  and  royalties;  labor  standards;  occupational  health;  waste  disposal;  toxic 
substances; water use; land use; Native American consultations and accommodations; environmental protection and remediation; 
endangered and protected species; mine, mill and other facility decommissioning and reclamation; mine safety; transportation 
safety and emergency response; and other matters. Compliance with such laws and regulations has increased the costs of exploring, 
drilling, developing, constructing, operating and closing of our mines, mills, plants and other extraction, recovery and processing 

25 

 
facilities. It is possible that, in the future, the costs, delays and other effects associated with such laws and regulations may impact 
our decision as to whether to operate existing mines or facilities, or, with respect to exploration, development or construction 
properties, whether to proceed with exploration, development or construction, or that such laws and regulations may result in our 
incurring significant costs to remediate or decommission properties that do not comply with applicable environmental standards 
at such time. We expend significant financial and managerial resources to comply with such laws and regulations. We anticipate 
continuing to do so as the historic trend toward stricter government regulation may continue. There can be no assurance that future 
changes in applicable laws and regulations will not adversely affect our activities, operations or financial condition. New laws 
and regulations, amendments to existing laws and regulations or more stringent implementation of existing laws and regulations, 
including through  stricter  license  and  permit  conditions, could  have  a  material  adverse  impact on  us,  increase  costs,  cause  a 
reduction in levels of, or suspension of, extraction or recovery and/or delay or prevent the construction or development of new 
mineral extraction properties. 

Mineral extraction is subject to potential risks and liabilities associated with pollution of the environment and the disposal of waste 
products occurring as a result of mineral exploration, extraction, mining, recovery and production. Environmental liability may 
result from mining or mineral extraction activities conducted by others prior to our ownership of a property. Failure to comply 
with applicable laws, regulations and permitting requirements may result in enforcement actions. These actions may result in 
orders issued by regulatory or judicial authorities causing activities or operations to cease or be curtailed, and may include corrective 
measures requiring capital expenditures, installation of additional equipment or remedial actions. Companies engaged in uranium 
exploration operations may be required to compensate others who suffer loss or damage by reason of such activities and may have 
civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Should we be unable to fully fund the 
cost  of  remedying  an  environmental  problem,  the  Company  might  be  required  to  suspend  activities  or  operations,  declare 
bankruptcy, or enter into interim compliance measures pending completion of the required remedy, which could have a material 
adverse effect on the Company. To the extent that  we are  subject to uninsured environmental liabilities, the payment  of such 
liabilities would reduce otherwise available earnings and could have a material adverse effect on us. In addition, we do not have 
coverage for certain environmental losses and other risks as such coverage cannot be purchased at a commercially reasonable cost. 
Compliance with applicable environmental laws and regulations requires significant expenditures and increases mine and facility, 
construction, development and operating costs. 

Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is 
also  subject  to  extensive  government  regulation  and  policies. The  development  of  mineral  properties  and  related  facilities  is 
contingent upon governmental approvals that are complex and time consuming to obtain and which, depending upon the location 
of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables 
outside of our control. Any significant delays in obtaining or renewing such permits or licenses in the future could have a material 
adverse effect on us. In addition, the international marketing of uranium is subject to governmental policies and certain trade 
restrictions, such as those imposed by the suspension agreement between the United States and Russia. Changes in these policies 
and restrictions may adversely impact our business. 

Public acceptance of nuclear energy and competition from other energy sources is unknown. 

Growth of the uranium and nuclear industry will depend upon continued and increased acceptance of nuclear technology as an 
economic means of generating electricity. Because of unique political, technological and environmental factors that affect the 
nuclear industry, including the risk of a nuclear incident, the industry is subject to public opinion risks that could have an adverse 
impact on the demand for nuclear power and increase the regulation of the nuclear power industry. Nuclear energy competes with 
other sources of energy, including oil, natural gas, coal, hydro-electricity and renewable energy sources. These other energy sources 
are to some extent interchangeable with nuclear energy, particularly over the longer term. Sustained lower prices of oil, natural 
gas, coal and hydroelectricity may result in lower demand for uranium concentrates. Increased government regulation and technical 
requirements may make nuclear uneconomic, resulting in lower demand for uranium concentrates. Technical advancements and 
government subsidies in renewable and other alternate forms of energy, such as wind and solar power, could make these forms of 
energy more commercially viable and put additional pressure on the demand for uranium concentrates. 

Unfavorable media coverage of mining or nuclear energy could negatively affect our business. 

The Company is subject to media coverage relating to mining and the production of uranium and other forms of nuclear energy, 
some of which can be inaccurate, un-objective or politically motivated. As a result, the Company is frequently required to address 
or respond to such media coverage, which can be costly and time-consuming for the Company. Such inaccurate and non-objective 
media coverage can also negatively impact the public’s perception of the Company’s activities, the market for the Company’s 
securities, government relations, permitting activities and legal challenges. 

26 

 
The uranium industry is highly competitive. 

The international uranium industry, including the supply of uranium concentrates, is competitive. We market uranium in direct 
competition with supplies available from a relatively small number of uranium mining companies, from nationalized uranium 
companies, from uranium produced as a byproduct of other mining operations, from excess inventories, including inventories 
made available from decommissioning of nuclear weapons, from reprocessed uranium and plutonium, from used reactor fuel, and 
from the use of excess Russian enrichment capacity to re-enrich depleted uranium tails. Alarge quantity of current World production 
is foreign state subsidized and is inelastic, in that uranium market prices have little effect on the quantity supplied. In the case of 
foreign state subsidized production, uranium production is not subject to market factors and can be sold at prices that are less than 
the cost of production. The supply of uranium from Russia is, to some extent, impeded by a number of international trade agreements 
and policies. These agreements and any similar future agreements, governmental policies or trade restrictions are beyond our 
control and may affect the supply of uranium available in the United States and Europe. 

We compete with other mining companies and individuals for capital, mineral resources and reserves, and other mining assets, 
which may increase the cost of acquiring suitable claims, properties and assets, and we also compete with other mining companies 
to attract and retain key executives, employees and consultants. In addition, there are relatively few customers for uranium. There 
can be no assurance that we will continue to be able to compete successfully with our competitors in acquiring such properties 
and assets or in attracting and retaining skilled and experienced employees. 

Participation in Industry Trade Petition could have negative repercussions. 

The Company has participated in the filing of a Petition for Relief with the U.S. Department of Commerce under Section 232 of 
the Trade Expansion Act of 1962 (as amended) From Imports of Uranium Products that Threaten U.S. National Security. The 
Petition  describes  how  uranium  and  nuclear  fuel  from  state-owned  and  state-subsidized  enterprises  in  Russia,  Kazakhstan, 
Uzbekistan, and China potentially represent a threat to U.S. national security. The Petition seeks a remedy which will set a quota 
to limit imports of uranium into the U.S., effectively reserving 25% of the U.S. nuclear market for U.S. uranium production. 
Additionally, the Petition suggests implementation of a requirement for U.S. federal utilities and agencies to buy U.S. uranium in 
accordance with the President's Buy American Policy. Although the Company believes the proposed remedies will strengthen the 
U.S. uranium mining industry, bolster national defense, and improve supply diversification for U.S. utilities and their customers, 
there is a potential for negative responses or repercussions to the proposed remedies from various special interest groups, consumers 
of uranium and participants in other phases of the nuclear fuel cycle, which could have a negative impact on the Company and its 
operations. In addition, the costs of pursuing the Petition and such remedies could be significant. It should also be noted that there 
can be no certainty of the outcome of the investigation or the recommendation of the Secretary, and therefore the outcome of this 
process is uncertain. 

We may be unable to timely pay our outstanding debt obligations, which may result in us losing some of our assets covered by 
mortgage and/or other security arrangements and may adversely affect our assets, results of operations, and future prospects. 

We may from time to time enter into arrangements to borrow money in order to fund our operations and expansion plans, and 
such arrangements may include covenants that restrict our business in some way. We may also from time to time acquire properties 
whereby certain payment obligations owed to the seller are paid by us over time, with the seller’s sole remedy for non-payment 
by us being reacquisition of the property. Events may occur in the future, including events out of our control that would cause us 
to fail to satisfy our obligations under our existing convertible Debentures, indebtedness owed to the State of Wyoming in connection 
with the Nichols Ranch Project described below, and/or other debt or financing instruments. In such circumstances, or if we were 
to default on our obligations under the debt or financing instruments, the amounts drawn under our agreements may become due 
and payable before the agreed maturity date, and we may not have the financial resources to repay such amounts when due. 

On November 26, 2013, our subsidiary, Uranerz entered into a Financing Agreement (the “Financing Agreement”) with Johnson 
County, Wyoming (the “County”) pursuant to which the County agreed to loan to Uranerz (the “Loan”) the proceeds from the 
sale of its $20,000,000 Taxable Industrial Development Revenue Bond, Series 2013, (the “Bond”) upon the terms and conditions 
set out in the Financing Agreement, for the purpose of financing the Nichols Ranch project. On November 26, 2013, in connection 
with the Financing Agreement and the Loan, Uranerz as mortgagor entered into a Mortgage & Security Agreement, pursuant to 
which  Uranerz  granted  to  the Trustee  its  rights  and  interests  in  the  as-extracted  collateral,  contract  rights  relating  directly  or 
indirectly to the Lands (as identified in Exhibit A to the Mortgage & Security Agreement), general intangibles relating directly or 
indirectly to the Lands, fixtures or hereinafter located on the Lands or the Nichols Ranch ISR Plant, goods (including all inventory) 
and equipment, including without limitations the mineralized material and all personal property identified as owned by Uranerz 
in  the  Mortgage  &  Security Agreement  to  secure  Uranerz’  obligations  under  the  Financing Agreement,  the  Bond  Purchase 
Agreement and the Note. The Mortgage & Security Agreement contains restrictive covenants, including, without limitation, that 
obligate Uranerz not to: (i) sell, convey, mortgage, pledge or otherwise dispose of or encumber the Encumbered Property (as set 
forth in the Mortgage and Security Agreement) without first securing the written consent of the mortgagee; (ii) cancel or terminate 
any Post Production Contracts (as set forth in the Mortgage and Security Agreement) or consent to or accept any cancellation or 

27 

 
termination  thereof;  (iii)  amend  or  otherwise  modify  any  Post Production  Contracts  or  give  any  consent,  waiver  or  approval 
thereunder; (iv) waive any default under or breach of any Post Production Contracts; or (v) take any other action in connection 
with the Post Production Contract which would impair the value of the interest or rights of Uranerz thereunder or which would 
impair the interests or rights of the mortgagee. The current principal amount outstanding on the loan is $10.02 million. 

If Uranerz is unable to timely satisfy its obligations under the Loan, including timely payment of the interest when due and payment 
of the principal amount at maturity and Uranerz is not able to successfully extend the maturity date or otherwise re-negotiate the 
terms of the Note, the Trustee will have rights under the Mortgage and Security Agreement to potentially seize or sell the secured 
properties and interests, equipment and personal property and the Nichols Ranch Plant to satisfy Uranerz’ obligations under the 
Loan. Any failure to timely meet Uranerz’ obligations under the Loan may adversely affect our assets, results of operations and 
future prospects. 

Further, although most, but not all, of our reclamation obligations are bonded, and cash and other assets have been reserved to 
secure a portion but not all of this bonded amount, to the extent the bonded amounts are not fully collateralized, we will be required 
to provide additional cash to perform our reclamation obligations when they occur. In addition, the bonding companies have the 
right to require increases in collateral at any time, failure of which would constitute a default under the bonds. In such circumstances, 
we may not have the financial resources to perform such reclamation obligations or to increase such collateral when due. 

Our Convertible Debentures will mature in 2020 and will be retired through either cash payment or the issuance of Common 
Shares. 

On  July  24,  2012,  the  Company  issued  Cdn$22,000,000  aggregate  principal  amount  of  convertible  debentures,  with  Cdn. 
$20,870,000 currently remaining, which were amended on August 4, 2016 (the “Debentures”). The Debentures will mature on 
December 31, 2020 and are convertible into Common Shares of the Company at the option of the holder at a conversion price, 
subject to certain adjustments, of Cdn$4.15 per share at any time prior to redemption or maturity. The Debentures may be retired 
at maturity either through the payment of cash or the issuance of Common Shares based on then prevailing market prices, at the 
Company’s option. This will either result in the allocation of cash to the retirement of the Debentures, which could be used for 
other purposes, or the issuance of Common Shares, which would result in dilution to shareholders. 

We may need additional financing in connection with the implementation of our business and strategic plans from time to 
time. 

The exploration, construction and development of  mineral  properties and the ongoing operation of  mines and other facilities 
requires a substantial amount of capital and may depend on our ability to obtain financing through joint ventures, debt financing, 
equity financing or other means. We may accordingly need further capital in order to take advantage of further opportunities or 
acquisitions. Our financial condition, general market conditions, volatile uranium and vanadium markets, volatile interest rates, 
legal claims against us, a significant disruption to our business or operations, or other factors may make it difficult to secure 
financing necessary for the expansion of mining activities or to take advantage of opportunities for acquisitions. Further, continuing 
volatility in the credit markets may increase costs associated with debt instruments due to increased spreads over relevant interest 
rate benchmarks, or may affect our ability, or the ability of third parties we seek to do business with, to access those markets. 
Continued volatility in equity markets, specifically including energy and commodity markets, may increase the costs associated 
with equity financings due to a low share price, and the potential need to offer higher discounts and other value (e.g., warrants). 
There is no assurance that we will be successful in obtaining required financing as and when needed on acceptable terms, if at all. 

We are an “emerging growth company” and we cannot be certain if the reduced disclosure requirements applicable to 
emerging growth companies will make us less attractive to investors. 

We  are  an  “emerging  growth  company”  as  defined  in  the  JOBS Act.  We  will  continue  to  qualify  as  an  “emerging  growth 
company” until the earliest to occur of: (a) the last day of the fiscal year during which we had total annual gross revenues of US 
$1,000,000,000 or more; (b) the last day of our fiscal year following the fifth anniversary of the date of the first sale of our 
common equity securities pursuant to an effective registration statement under the United States Securities Act of 1933, as 
amended (the “Securities Act”), such as our Form S-8 Registration Statement filed on March 31, 2014; (c) the date on which 
we, during the previous 3-year period, issued more than US$1,000,000,000 in non-convertible debt; or (d) the date on which 
we are deemed to be a ‘large accelerated filer.’ 

For so long as we continue to qualify as an emerging growth company, we will be exempt from the requirement to include an 
auditor attestation report relating to internal control over financial reporting pursuant to Section 404(b) of the Sarbanes-Oxley 
Act in our annual reports filed under the Exchange Act, even if we do not qualify as a “smaller reporting company,” as well as 
certain other exemptions from various reporting requirements that are applicable to other public companies. 

28 

 
 
 
The issuance of additional Common Shares may impact the trading price of our common shares. 

In times of depressed commodity prices, such as exist at this time, the Company may be required to raise additional capital to 
meet its liquidity requirements, through the issuance of additional common shares under our At the Market (“ATM”) program or 
otherwise, and/or dispose of assets. If we raise additional funding by issuing additional equity securities or securities convertible, 
exercisable, or exchangeable for equity securities, such financing may substantially dilute the interests of our shareholders and 
reduce the value of their investment. Similar dilution could result from the sale of assets to meet liquidity requirements. 

Mining operations involve a high degree of risk. 

The  exploration,  construction,  development,  operation,  and  other  activities  associated  with  mineral  projects,  along  with  the 
expansion of existing recovery operations and mining activities and restarting of projects, involve significant risks, including 
financial, technical, and regulatory risk. Development or advancement of any of the exploration properties in which we have an 
interest  will  only  follow  upon  obtaining  satisfactory  exploration  results,  project  permitting  and  licensing, and  financing. The 
exploration, construction, development, operation and other activities associated with mineral projects involves significant financial 
risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. 
While discovery of a mine or other facility may result in substantial rewards, few properties which are explored are ultimately 
developed into producing mines or extraction or recovery facilities. Major expenses may be required to establish mineral resources 
and mineral reserves by drilling and to finance, permit, license, and construct extraction, mining, recovery and processing facilities. 
It is impossible to ensure that the current or proposed exploration, permitting, construction, or development programs on our 
mineral properties will result in a profitable commercial extraction, mining, or recovery operations. 

Whether a mineral deposit will be commercially viable depends on a number of factors, which include, among other things: the 
accuracy of resource and reserve estimates; the particular attributes of the deposit, such as its size, geology and grade; the ability 
to economically recover commercial quantities of the minerals; proximity to infrastructure and availability of personnel; financing 
costs; governmental regulations, including regulations relating to prices, taxes, royalties; the potential for litigation; land use; 
importing and exporting; and environmental and cultural protection. The construction, development, expansion and restarting of 
projects are also subject to the successful completion of engineering studies, the issuance of necessary governmental permits, the 
availability of adequate financing, and that engineering and construction timetables and capital costs are correctly estimated for 
our  projects,  including  restarting  projects  on  standby,  and  such  construction  timetables  and  capital  costs  are  not  affected  by 
unforeseen circumstances. The effect of these factors cannot be accurately predicted, but the combination of these factors, along 
with others, may result in our not receiving an adequate return on invested capital. 

It is possible that actual costs and economic returns of current and new extraction, mining, or recovery operations may differ 
materially from our best estimates. It is not unusual in the mining industry for new mining operations and facilities to experience 
unexpected problems during the start-up phase, take much longer than originally anticipated to bring into a recovery or producing 
phase, require more capital than anticipated, operate at a higher cost than expected, and/or have reclamation liabilities which are 
higher than expected. 

There can be no assurance that as the Company mines its properties, or disposes of properties, the reduction of existing mineral 
resources through depletion or sales, will be replaced with new resources of comparable value. 

There is uncertainty in the estimation of mineral reserves and mineral resources. 

Our properties do not contain any mineral reserves under Industry Guide 7. See “Cautionary Note to United States Investors 
Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates,” above. 

Mineral reserves and resources are statistical estimates of mineral content, based on limited information acquired through drilling 
and other sampling methods, and require judgmental interpretations of geology. Successful extraction requires safe and efficient 
mining and processing. Our mineral reserves and resources are estimates, and no assurance can be given that the estimated reserves 
and resources are accurate or that the indicated level of uranium, vanadium or copper will be produced economically or otherwise. 
Such estimates are, in large part, based on interpretations of geological data obtained from drill holes and other sampling techniques. 
Actual mineralization or formations may be different from those predicted. Further, it may take many years from the initial phase 
of drilling before production is possible, and during that time the economic feasibility of exploiting a discovery may change. 

Mineral reserve and resource estimates for properties that have not commenced extraction, production or recovery are based, in 
many instances, on limited and widely spaced drill-hole information, which is not necessarily indicative of the conditions between 
and around drill holes. Accordingly, such mineral resource and reserve estimates may require revision as more drilling information 
becomes available or as actual extraction, production or recovery experience is gained. It should not be assumed that all or any 
part of our mineral resources constitutes, or will be converted into, reserves. Market price fluctuations of uranium, vanadium or 
copper as applicable, as well as increased production and capital costs or reduced recovery rates, may render our proven and 

29 

 
probable reserves unprofitable to develop at a particular site or sites for periods of time or may render mineral reserves containing 
relatively lower grade mineralization uneconomic. 

Our business is subject to extensive environmental regulations that may make exploring, mining, or related activities expensive, 
and which may change at any time. 

We are required to comply with environmental protection laws and regulations and permitting requirements promulgated by federal 
agencies and various states and counties in which we operate and conduct our activities, in connection with extraction, mining, 
recovery and milling operations. The uranium industry is subject not only to the worker health and safety and environmental risks 
associated with all mining activities, but also to additional risks uniquely associated with uranium extraction, mining, recovery, 
and milling. We expend significant resources, both financial and managerial, to comply with these laws and regulations. The 
possibility of more stringent regulations exists in the areas of worker health and safety, storage of hazardous materials, standards 
for heavy equipment used in extraction, mining, recovery or milling, the disposition of wastes, the decommissioning and reclamation 
of exploration, extraction, mining, recovery, milling and in-situ sites, climate change and other environmental matters, each of 
which could have a material adverse effect on the cost or the viability of a particular project. 

We cannot predict what environmental legislation, regulations or policies will be enacted or adopted in the future or how future 
laws and regulations will be administered or interpreted. The recent trend in environmental legislation and regulation is generally 
toward stricter standards, and this trend is likely to continue in the future. This recent trend includes, without limitation, laws and 
regulations relating to air and water quality, mine and other facility reclamation, waste handling and disposal, the protection of 
certain species and the preservation of certain lands. These regulations may require the acquisition of permits or other authorizations 
for certain activities. These laws and regulations may also limit or prohibit activities on certain lands. Compliance with more 
stringent laws and regulations, as well as potentially more vigorous enforcement policies, stricter interpretation of existing laws 
and stricter permit and license conditions, may necessitate significant capital outlays, may materially affect our results of operations 
and business or may cause  material changes or delays in our intended activities. There can be no assurance of our continued 
compliance or ability to meet stricter environmental laws and regulations and permit or license conditions. Delays in obtaining 
permits and licenses could impact expected production levels or increases in expected uranium extraction levels. 

Our operations may require additional analysis in the future including environmental, cultural, and social impact and other related 
studies. Certain activities require the submission and approval of environmental impact assessments. We cannot provide assurance 
that we will be able to obtain or maintain all necessary permits that may be required to continue operations or exploration and 
development of our properties or, if feasible, to commence construction, development, operation or other activities relating to 
mining facilities at such properties on terms that enable operations or activities to be conducted at economically justifiable costs. 
If we are unable to obtain or maintain, licenses, permits or other rights for construction or development of our properties, or 
otherwise fail to manage adequately future environmental issues, our uranium recovery operations and mining activities could be 
materially and adversely affected. 

On December 31, 2014, the EPA issued a proposed rule that would amend 10 CFR §192, “Health and Environmental Protection 
Standards for Uranium and Thorium Mill Tailings”, to add standards and regulation for ISR facilities such as the Nichols Ranch 
Project and the Alta Mesa Project. That proposed rule was withdrawn on January 3, 2017 and a new proposed rule was introduced 
on January 19, 2017. EPA is currently considering whether to proceed with the proposed rule. If EPA decides to proceed, the effect 
of the new proposed rule could be significant if promulgated. Any changes to rules or regulations that could significantly adversely 
impact any of our material projects could have a material adverse impact on the Company. 

In addition, former President Obama designated the Bears Ears National Monument by executive order in December of 2016, 
which comprises 1.35 million acres of land in San Juan County, Utah. As originally mapped, the monument boundary was on the 
western property line of the White Mesa Mill, and the western monument boundary was very close to the permit boundary of the 
Daneros Mine, which could impact access to the mine. A National Monument created on land where our projects are sited, or near 
the Company’s projects, along with any resulting changes to rules or regulations, could significantly adversely impact any of our 
material projects and could have a material adverse impact on the Company. 

The current Trump administration modified the designation of the Bears Ears National Monument on December 4, 2017 through 
Presidential Proclamation, which took effect on February 2, 2018. The revised boundaries have been moved well away from the 
White Mesa Mill property boundary as well as the Daneros Mine permit boundary. This revision of the monument boundaries is 
currently under legal challenge, but the Company does not expect that action to interfere with operations or activity. 

Opposition to mining may disrupt our business activities. 

In recent years, governmental agencies, non-governmental organizations, individuals, communities and courts have become more 
vocal and active with respect to their opposition to certain mining and business activities including with respect to production and 
uranium recovery at our facilities, such as the White Mesa Mill and the Canyon Project. This opposition may take on forms such 
as road blockades, applications for injunctions seeking to cease certain construction, development, extraction, mining and/or 

30 

 
milling or recovery activities, refusals to grant access to lands or to sell lands on commercially viable terms, lawsuits for damages 
or to revoke or modify licenses and permits, issuances of unfavorable laws and regulations, and other rulings contrary to our 
interests. These actions can occur in response to current activities or in respect of mines or facilities that are decades old. In addition, 
these actions can occur in response to our activities or the activities of other unrelated entities. Opposition to our activities may 
also result from general opposition to nuclear energy and mining. Opposition to our business activities are beyond our control. 
Any opposition to our business activities may cause a disruption to our business activities and may result in increased costs, and 
this could have a material adverse effect on our business and financial condition. 

We are subject to litigation and other legal proceedings arising in the normal course of business and may be involved in disputes 
with other parties in the future which may result in litigation. 

The causes of potential future litigation and legal proceedings cannot be known and may arise from, among other things, business 
activities, environmental laws, permitting and licensing activities, volatility in stock prices, or alleged failure to comply with 
disclosure obligations. The results of litigation and proceedings cannot be predicted with certainty, and may include injunctions 
pending the outcome of such litigation and proceedings. Failure to resolve any such disputes favorably may have a material adverse 
impact on our financial performance, cash flow and results of operations. 

We are subject to costs associated with decommissioning and reclamation of our properties. 

As owner and operator of the White Mesa Mill, the Nichols Ranch Project, the Alta Mesa Project, and numerous uranium and 
uranium/vanadium projects and other facilities located in the United States and certain permitting, construction, development and 
exploration properties, and for so long as we remain an owner thereof, we are obligated to eventually reclaim or participate in the 
reclamation of such properties. Most, but not all, of our reclamation obligations are bonded, and cash and other assets have been 
reserved to secure a portion, but not all, of this bonded amount. Although our financial statements will record a liability for the 
asset retirement obligation, and the bonding requirements are generally periodically reviewed by applicable regulatory authorities, 
there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability 
to be provided on our financial statements. Further, to the extent the bonded amounts are not fully collateralized, we will be required 
to come up with additional cash to perform our reclamation obligations when they occur. 

Decommissioning plans for our properties have been filed with applicable regulatory authorities. These regulatory authorities have 
accepted the decommissioning plans in concept, not upon a detailed performance forecast, which has not yet been generated. Over 
time, further regulatory review of the decommissioning plans may result in additional decommissioning requirements, associated 
costs  and  the  requirement  to  provide  additional  financial  assurances,  including  as  our  properties  approach  or  go  into 
decommissioning. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating 
thereto) may be required in the future by regulatory authorities. 

We are subject to technical innovation and obsolescence in the uranium industry. 

Requirements for our products and services may be affected by technological changes in nuclear reactors, enrichment, and used 
uranium fuel reprocessing. These technological changes could reduce the demand for uranium. The cost competitiveness of our 
operations may be impacted through the development and commercialization of other uranium mining, milling, processing and 
other technologies. As a result, our competitors may adopt technological advancements that give them an advantage over the 
Company. 

Our mineral properties may be subject to defects in title. 

We have investigated our rights to explore and exploit all of our material properties and, to the best of our knowledge, those rights 
are in good standing. However, no assurance can be given that such rights will not be revoked, or significantly altered, to our 
detriment. There  can  also  be  no  assurance  that  our  rights  will  not  be  challenged  or  impugned  by  third  parties,  including  by 
governments, surface owners, and non-governmental organizations. 

The validity of unpatented mining claims on U.S. public lands is sometimes difficult to confirm and may be contested. Due to the 
extensive requirements and associated expense required to obtain and maintain mining rights on U.S. public lands, our properties 
are subject to various title uncertainties which are common to the industry with the attendant risk that there may be defects in title. 
In addition, the Secretary of the Interior has withdrawn certain lands around the Grand Canyon National Park from location and 
entry under the Mining Laws. All of our material Arizona Strip properties, other than the Wate Property, are located on these 
withdrawn lands. No new mining claims may be filed on the withdrawn lands and no new plans of operations may be approved, 
other than plans of operations on mining claims that were valid at the time of withdrawal and that remain valid at the time of plan 
approval. Whether or not a mining claim is valid must be determined by a mineral examination conducted by BLM or USFS, as 
applicable. The mineral examination, which involves an economic evaluation of a project, must demonstrate the existence of a 
locatable mineral resource and that the mineral resource constitutes discovery of a valuable mineral deposit. We believe that all 
of our material Arizona Strip projects are on valid mining claims that would withstand a mineral examination. Further, our Arizona 

31 

 
1 Project has an approved PO which, absent modification, would not require a mineral examination. Although our Canyon project 
also has an approved PO, which, absent modification, would not require a mineral examination, the USFS performed a mineral 
examination at that mine in 2012, and concluded that the underlying mining claims are valid existing rights (a decision which is 
involved  in  a  current  court  challenge).  However,  market  conditions  may  postpone  or  prevent  the  performance  of  mineral 
examinations on certain other properties and, if a mineral examination is performed on a property, there can be no guarantee that 
the mineral examination would not result in one or more of our mining claims being considered invalid, which could prevent a 
project from proceeding. 

Certain of our properties, or significant portions thereof, are mineral leases that have fixed terms, both with State and private 
parties. Certain of our properties are subject to other agreements that may affect our ability to explore, permit, develop and operate 
them, including surface use, access and other agreements. There can be no guarantee that we will be able to renew or extend such 
leases and agreements on favorable terms or at all. The failure to renew any such leases or agreements could have a material 
adverse effect on our operations. 

Possible amendments to the General Mining Law could make it more difficult or impossible for us to execute our business 
plan. 

Members of the United States Congress have repeatedly introduced bills which would supplant or alter the provisions of the United 
States Mining Law of 1872, as amended. Such bills have proposed, among other things, to (i) either eliminate or greatly limit the 
right to a mineral patent; (ii) significantly alter the laws and regulations relating to uranium mineral development and recovery 
from unpatented and patented mining claims; (iii) impose a federal royalty on production from unpatented mining claims; (iv) 
impose time limits on the effectiveness of plans of operation that may not coincide with mine or facility life; (v) impose more 
stringent environmental compliance  and reclamation requirements on activities on  unpatented  mining claims; (vi) establish a 
mechanism that would allow states, localities and Native American tribes to petition for the withdrawal of identified tracts of 
federal land from the operation of the U.S. general mining laws; and (vii) allow for administrative determinations that mining or 
similar activities would not be allowed in situations where undue degradation of the federal lands in question could not be prevented. 
If enacted, such legislation could change the cost of holding unpatented mining claims and could significantly impact our ability 
to develop locatable mineral resources on our patented and unpatented mining claims. Although it is impossible to predict at this 
point what any legislated royalties might be, enactment could adversely affect the potential for construction and development and 
the  economics  of  existing  operating  mines  and  facilities.  Passage  of  such  legislation  could  adversely  affect  our  financial 
performance. 

In addition to the withdrawal noted in the previous risk factor, there are currently other designated or proposed withdrawals of 
federal lands for the purposes of mineral location and development and proposed designations of national monuments which would 
have a similar effect as a withdrawal. While such proposals are not yet final and would require further federal action, if they were 
to occur, it is uncertain whether any such withdrawals or designations would affect in any manner our current mineral projects. 

Because we may be unable to secure access rights to certain of our properties, we may be unable to explore and/or advance 
such properties. 

We are currently in the process of negotiating and clarifying access rights to certain of our properties, such as the Roca Honda 
Project and the Wate Project, with private landholders. There can be no guarantee that we will be able to negotiate or clarify such 
access rights on favorable terms, or at all. The failure to negotiate or clarify such access rights on suitable terms could have a 
material adverse effect on our operations. 

We are subject to foreign currency risks. 

Our operations are subject to foreign currency fluctuations. Our operating expenses and revenues are primarily incurred in U.S. 
dollars, while some of our cash balances and expenses and our Debentures are measured in Canadian dollars. The fluctuation of 
the Canadian dollar in relation to the U.S. dollar will consequently have an impact on our profitability and may also affect the 
value of our assets and shareholders’ equity. In addition, the recent strengthening of the U.S. dollar relative to other currencies 
makes our mineral extraction and recovery less competitive in relation to similar activities in other countries. Current and future 
strengthening of the U.S. dollar in relation to the currencies of other countries can have a material impact on our cash flows and 
profitability, and affect the value of our assets and shareholders’ equity. 

We may not realize the anticipated benefits of previous acquisitions. 

We may not realize the anticipated benefits of acquiring: the Sheep Mountain Project in 2012; Denison Mines Corp’s US Mining 
Division in 2012, including the White Mesa Mill, certain of the Arizona Strip Properties, the Henry Mountains Complex, the La 
Sal Project, and the Daneros Project; Strathmore in 2013, including the Roca Honda Project; Uranerz in 2015, including the Nichols 
Ranch Project; and EFR Alta Mesa in 2016, including the Alta Mesa Project, due to integration, operational and uranium market 
challenges. Decreases in commodity prices have required us to place or maintain a number of acquired properties and facilities 

32 

 
on standby and to defer permitting and construction and development activities on certain other acquired assets, until market 
conditions warrant otherwise, and in some cases we have elected to sell or abandon certain of these properties at a loss. Our success 
following those acquisitions will depend in large part on the success of our management in integrating the acquired assets into the 
Company. Our failure to achieve such integration and to mine or advance such assets could result in our failure to realize the 
anticipated benefits of those acquisitions and could impair our results of operations, profitability and financial results. 

We prepare estimates of future uranium extraction and recovery, and there are no assurances that such estimates will be 
achieved. 

We may from time to time prepare estimates of future uranium extraction and recovery, or increases in uranium extraction and 
recovery, for particular operations, or relating to our ability to increase uranium extraction and recovery in response to increases 
in commodity prices, as market conditions warrant or otherwise. No assurance can be given that any such extraction and recovery 
estimates will be achieved, nor can assurance be given that extraction or recovery increases will be achieved in a cost effective or 
timely manner. Failure to achieve extraction and recovery estimates or failure to achieve extraction and recovery in a cost effective 
or timely manner could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. 
These estimates are based on, among other things, the following factors: the accuracy of mineral resource and reserve estimates; 
the accuracy of assumptions regarding ground conditions and physical characteristics of mineralized materials, such as hardness 
and presence or absence of particular metallurgical characteristics; the accuracy of estimated rates and costs of extraction, recovery 
and processing; assumptions as to future commodity prices; assumptions relating to changes in laws, regulations or policies, or 
lack thereof, that could impact the cost and time required to obtain regulatory approvals, licenses and permits; assumptions relating 
to obtaining required licenses and permits in a timely  manner, including the time required to satisfy environmental analyses, 
consultations and public input processes; assumptions relating to challenges to or delays in the licensing and permitting process; 
and assumptions regarding any appeals or lack thereof, or injunctions or lack thereof, relating to any approvals, licenses or permits. 

Our actual uranium extraction and recovery may vary from estimates for a variety of reasons, including, among others: actual 
mineralized material extracted, mined or recovered varying from estimates of grade, tonnage, dilution and metallurgical and other 
characteristics;  short  term  operating  factors  relating  to  the  mineral  resources  and  reserves,  such  as  the  need  for  sequential 
construction or development of mineralized materials or deposits and the processing of new or different mineral grades; risk and 
hazards associated with extraction, mining and recovery; natural phenomena, such as inclement weather conditions, underground 
floods, earthquakes, pit wall failures and cave-ins; unexpected labor shortages or strikes; varying conditions in the commodities 
markets; and delays in obtaining or denial, challenges or appeals of regulatory approvals, licenses and permits or renewals of 
existing approvals, licenses or permits. 

In addition, the Company is evaluating recovering copper at the White Mesa Mill as a by-product with uranium from its Canyon 
Project. There can be no assurance that this evaluation will result in the Mill being able to recover copper at the Mill as a by- 
product on an economic basis. 

We depend on the issuance of license amendments and renewals which cannot be guaranteed. 

We maintain regulatory licenses and permits in order to operate our White Mesa Mill, Nichols Ranch Project and Alta Mesa Project, 
all of which are subject to renewal from time to time and are required in order to operate in compliance with applicable laws and 
regulations. In addition, depending on our business requirements, it may be necessary or desirable to seek amendments to one or 
more of our licenses or permits from time to time. While we have been successful in renewing our licenses and permits on a timely 
basis in the past and in obtaining such amendments as have been necessary or desirable, there can be no assurance that such license 
and permit renewals and amendments will be issued by applicable regulatory authorities on a timely basis or at all in the future. 

Mining, mineral extraction, recovery and milling are subject to a high degree of risk, and we are not insured to cover against 
all potential risks. 

Our operations and activities are subject to all of the hazards and risks normally incidental to exploration, construction, development, 
extraction and mining of mineral properties, and recovery, processing and milling, including: environmental hazards; industrial 
accidents; labor disputes, disturbances and unavailability of skilled labor; encountering unusual or unexpected geologic formations; 
rock bursts, pressures, cave-ins, flooding; periodic interruptions due to inclement or hazardous weather conditions; technological 
and processing problems, including unanticipated metallurgical difficulties, ground control problems, process upsets and equipment 
malfunctions; the availability and/or fluctuations in the costs of raw materials and consumables used in our production and recovery 
processes; the ability to procure mining and other equipment and operating and other supplies in sufficient quantities and on a 
timely basis; and other extraction, mining, recovery, milling, and processing risks, as well as risks associated with our dependence 
on third parties in the provision of transportation and other critical services. Many of the foregoing risks and hazards could result 
in damage to, or destruction of, our mineral properties or processing or recovery facilities, personal injury or death, environmental 
damage, delays in or interruption of or cessation of extraction, mining, production and recovery from our mines or processing 
facilities or in our exploration, construction or development activities, delay in or inability to receive regulatory approvals to 

33 

 
 
transport our uranium concentrates, or costs, monetary losses and potential legal liability and adverse governmental action. In 
addition, due to the radioactive nature of the materials handled in uranium extraction, mining, recovery, and processing, additional 
costs and risks are incurred by us on a regular and ongoing basis. 

While we may obtain insurance against certain risks in such amounts as we consider adequate, the nature of these risks are such 
that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which we cannot insure 
or against which we may elect not to insure. The potential costs which could be associated with any liabilities not covered by 
insurance or in excess of insurance coverage or compliance with applicable laws and regulations may cause substantial delays 
and require significant capital outlays, adversely affecting our future earnings, financial position and competitive position. No 
assurance can be given that such insurance will continue to be available or will be available at economically feasible premiums 
or that it will provide sufficient coverage for losses related to these or other risks and hazards. This lack of insurance coverage 
could result in material economic harm to us. 

We will need to continuously add to our mineral reserve and resource base and to our alternate feed materials. 

Our properties do not contain any mineral reserves under SEC Industry Guide 7. See “Cautionary Note to United States Investors 
Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates,” above. 

Our material mineral resources are located at the Nichols Ranch Project, the Alta Mesa Project, the Canyon Project, the Roca 
Honda Project, the Sheep Mountain Project, the Henry Mountains Complex, the La Sal Project, and the Daneros Project. These 
projects are our primary sources (and potential sources) of current and future uranium concentrates. Unless other mineral resources 
or reserves are discovered or extensions to existing resource bodies are found, our sources of extraction, production and recovery 
for uranium concentrates will decrease over time as our current mineral resources are depleted. There can be no assurance that 
our future exploration, construction, development and acquisition efforts will be successful in replenishing our mineral resources 
or finding or developing reserves. In addition, while we believe that many of our properties will eventually engage in extraction 
or mining activities, there can be no assurance that they will be placed into such activities, or that they will be able to replace 
current extraction or mining activities. 

We also recover uranium from processing alternate feed materials at our White Mesa Mill. There can be no assurance that additional 
sources of alternate feed materials will be forthcoming in the future on commercially acceptable terms or otherwise, or that we 
will be successful in receiving all required regulatory approvals, licenses and permits on a timely basis to allow for the receipt 
and processing of any such alternate feed materials. 

Our sales of uranium and vanadium products expose us to the risk of non-payment. 

Our sales of uranium and vanadium products expose us to the risk of non-payment. We manage this risk by monitoring the credit 
worthiness of our customers and requiring pre-payment or other forms of payment security from customers with an unacceptable 
level of credit risk. Most of the Company’s sales are to major nuclear utilities, which pose a relatively low risk of non-payment 
due to their large size and capitalization. 

We are dependent on key personnel and qualified and experienced employees. 

Our  success  will  largely  depend  on  the efforts  and abilities of  certain senior officers  and  key  employees,  some  of  whom  are 
approaching retirement. Certain of these individuals have significant experience in the uranium industry. The number of individuals 
with significant experience in this industry is small. While we do not foresee any reason why such officers and key employees 
will not remain with us, other than through retirement, if for any reason they do not, we could be adversely affected. We have not 
purchased key person life insurance for any of these individuals, other than for our Chief Executive Officer. 

Our success will also depend on the availability of qualified and experienced employees to work in our operations and our ability 
to attract and retain such employees. The number of individuals with relevant mining and operational experience in this industry, 
especially the U.S. uranium industry, is small. 

If we fail to maintain an effective system of internal control, we may not be able to accurately report financial results or prevent 
fraud. 

Internal controls over financial reporting are procedures designed to provide reasonable assurance that transactions are properly 
authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported. 
Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed 
with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and 
communicated to a company’s management, including its chief executive officer and chief financial officer, as appropriate, to 
allow timely decisions regarding required disclosure. A control system, no matter how well designed and operated, can provide 
only reasonable, not absolute, assurance with respect to the reliability of reporting, including financial reporting and financial 
statement preparation. 

34 

 
We are dependent on business partners, government and third party consents. 

We have a number of joint ventures and other business relationships relating to our properties and projects, including key projects, 
such  as  the Arkose  Mining Venture,  which  can  restrict  our  ability  to  act  unilaterally  with  respect  to  those  projects  in  certain 
circumstances. There can be no assurances that we will be able to maintain relationships  with our joint venture and business 
partners  to  allow  for  satisfactory  exploration,  permitting,  construction,  development,  extraction,  mining,  recovery  or  milling 
relating to any such projects. Our operations and activities are also dependent from time to time on receiving government and 
other third party consents and approvals. There can be no assurances that all such consents and approvals will be forthcoming 
when required. 

Certain of our directors may be in a position of conflict of interest with respect to the Company due to their relationship with 
other resource companies. 

Some of our directors are also directors of other companies that are similarly engaged in the business of acquiring, exploring and 
developing natural resource properties. Such associations may give rise to conflicts of interest from time to time. In particular, 
one of the consequences will be that corporate opportunities presented to a director may be offered to another company or companies 
with which the director is associated, and may not be presented or made available to us. Our directors are required by law to act 
honestly and in good faith with a view to the best interests of the Company, to disclose any interest which they may have in any 
project or opportunity of the Company, and to abstain from voting on such matter. Conflicts of interest that arise will be subject 
to and governed by the procedures prescribed in our Code of Ethics and by the Business Corporations Act (Ontario). 

Our relationship with our employees may be impacted by changes in labor relations. 

None of our operations or activities currently directly employ unionized workers who work under collective agreements. However, 
there can be no assurance that our employees or the employees of our contractors will not become unionized in the future, which 
may impact our operations and activities. Any lengthy work stoppages may have a material adverse impact on our future cash 
flows, earnings, results of operations and financial condition. 

Mining, extraction, recovery, processing, construction, development, and exploration activities depend, to a substantial degree, 
on adequate infrastructure. 

Reliable roads, bridges, power sources, and water supply are important determinants affecting capital and operating costs. We 
consider the existing infrastructure to be adequate to support our proposed operations and activities. However, unusual or infrequent 
weather  phenomena  including  drought,  sabotage,  government,  or  other  interference  in  the  maintenance  or  provision  of  such 
infrastructure could adversely affect our operations and activities, financial condition and results of operations. 

Because the probability of an individual prospect ever having reserves as defined by the SEC is not known, our properties may 
not contain any reserves, and any funds spent on exploration may be lost. 

We have no reserves as defined by SEC Industry Guide 7. Because the probability of an individual prospect ever having reserves 
is uncertain, our properties may not contain any reserves, and any funds spent on exploration, construction, development, extraction, 
and recovery may be lost. We do not know with certainty that economically recoverable uranium exists on any of our properties 
as defined by SEC Industry Guide 7. Further, although we are undertaking uranium extraction activities at our Nichols Ranch 
Project, our lack of established reserves means that we are uncertain as to our ability to continue to generate revenue from our 
operations. We may never discover uranium in commercially exploitable quantities and any identified deposit may never qualify 
as a commercially mineable (or viable) reserve. We will continue to attempt to acquire the surface and mineral rights on lands that 
we think are geologically favorable or where we have historical information in our possession that indicates uranium mineralization 
might be present. 

The exploration and, if warranted, construction relating to or development of mineral deposits involves significant financial and 
other risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not 
eliminate. Few properties which are explored are ultimately developed into producing mines. Major expenditures are required to 
establish reserves by drilling and to construct mining and processing facilities at a site. Our uranium properties are all classified 
under SEC Industry Guide 7 to be at the exploration stage and do not contain any reserves at this time. It is impossible to ensure 
that the current or proposed exploration programs and other activities on properties in which we have an interest will result in the 
delineation of mineral reserves or in profitable commercial operations. Our operations and activities are subject to the hazards and 
risks normally incident to exploration and production of uranium, precious and base metals, any of which could result in damage 
to life or property, environmental damage and possible legal liability for such damage. While we may obtain insurance against 
certain risks, the nature of these risks is such that liabilities could exceed policy limits or could be excluded from coverage. There 
are also risks against which we cannot insure or against which we may elect not to insure. The potential costs which could be 
associated with any liabilities not covered by insurance, or in excess of insurance coverage, or compliance with applicable laws 

35 

 
and regulations may cause substantial delays and require significant capital outlays, adversely affecting our future earnings and 
competitive position and, potentially our financial viability. 

U.S. investors may have difficulty bringing actions and enforcing judgments under U.S. securities laws against an Ontario 
corporation. 

Although our primary trading market is the NYSE American, we have a majority of U.S. resident shareholders, are a U.S. Domestic 
Issuer for SEC purposes, and all of our assets, operations and employees are in the U.S., the Company was incorporated in Ontario, 
and as a result, investors in the United States or in other jurisdictions outside of Canada may have difficulty bringing actions and 
enforcing judgments against us, our directors, our executive officers and some of the experts named in this Annual Report on Form 
10-K based on civil liabilities provisions of the federal securities laws or other laws of the United States or any state thereof or 
the equivalent laws of other jurisdictions of residence. 

Any attempt by U.S. President Trump to withdraw from or materially modify NAFTA and certain other international trade 
agreements could adversely affect our business, financial condition and results of operations, to the extent dependent on the 
jurisdiction of our incorporation. 

Although our primary trading market is the NYSE American, we have a majority of U.S. resident shareholders, are a U.S. 
Domestic Issuer for SEC purposes, and all of our assets, operations and employees are in the U.S., the Company was 
incorporated in Ontario. During the election campaign, then President-elect Trump made comments suggesting that he was not 
supportive of certain existing international trade agreements, including the North American Free Trade Agreement (“NAFTA”). 
At this time, it remains unclear what President Trump will or will not do with respect to these international trade agreements. If 
President Trump takes action to withdraw from or materially modify NAFTA or certain other international trade agreements, and 
such actions depend on the jurisdiction of our incorporation, then our business, financial condition and results of operations 
could possibly be adversely affected, depending on the nature of the action. 

The impact of the new tax legislation on our financial statements is uncertain and could be adverse. 

On December 22, 2017, U.S. tax legislation commonly known as the Tax Cuts and Jobs Act, or TCJA, was signed into law, 
significantly reforming the U.S. Internal Revenue Code. The TCJA, among other things, includes changes to U.S. federal tax 
rates, imposes significant additional limitations on the deductibility of interest, allows for the expensing of capital expenditures, 
puts into effect the migration from a “worldwide” system of taxation to a territorial system and modifies or repeals many 
business deductions and credits. We continue to examine the impact the TCJA may have on our business. We will evaluate the 
effect of the TCJA on our projection of minimal cash taxes or to our net operating losses. The estimated impact of the TCJA is 
based on our management’s current knowledge and assumptions and recognized impacts could be materially different from 
current estimates based on our actual results and our further analysis of the new law. 

None. 

ITEM 1B. UNRESOLVED STAFF COMMENTS 

36 

 
 
 
 
 
 
 
ITEM 2. DESCRIPTION OF PROPERTIES 

Cautionary Note to U.S. Investors: Information contained in this item differs from the disclosure requirements of the SEC applicable 
to U.S.-incorporated domestic issuers. This Item 2 and other sections of this Annual  Report contain the  terms  “measured  mineral 
resources,” “indicated mineral resources,” “inferred mineral resources,” “proven mineral reserves,” and “probable mineral reserves” 
as defined in accordance with NI 43-101. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources,” 
at the beginning of this Annual Report for definitions and further discussion on the differences between terms under NI 43-101 and 
SEC Industry Guide 7. 

37 

 
 
 
 
 
Overview 

Energy Fuels is engaged in conventional and ISR uranium extraction and recovery, along with the exploration, permitting and evaluation 
of uranium properties in the United States. 

ISR Uranium Activities 

The Company conducts its ISR recovery activities through its Nichols Ranch Project in northeast Wyoming, which it acquired in June 
2015 through the acquisition of Uranerz, and its Alta Mesa Project in south Texas, which it acquired in June 2016 through the acquisition 
of EFR Alta Mesa. 

The Nichols Ranch Project includes: (i) the Nichols Ranch Plant; (ii) the Nichols Ranch Wellfields; (iii) the Jane Dough Property, and; 
(iv) the Hank Project, which includes the permitted but not constructed Hank Satellite Plant and the Hank Property. See “The Nichols 
Ranch ISR Project” below. Also through the acquisition of Uranerz, the Company acquired the Reno Creek Property, the West North 
Butte Property, the North Rolling Pin Property, and the Arkose Mining Venture, a joint venture of ISR properties held 81% by Energy 
Fuels. See “Non-Material Mineral Properties – Other ISR Projects,” below. 

The Alta Mesa Project has a fully-licensed and constructed ISR uranium recovery plant, with a design capacity of 1.5 million pounds 
of uranium concentrate per year. In order for Alta Mesa to be capable of uranium production, the Company will need to incur capital 
expenditures to develop wellfields. A decision to commence development will be made once uranium prices improve to a point where 
economic feasibility of the Alta Mesa Project is established. 

Conventional Uranium Activities 

The Company conducts its conventional uranium extraction and recovery activities through its White Mesa Mill, which is the only 
operating conventional uranium mill in the United States. The White Mesa Mill, located near Blanding, Utah, is centrally located such 
that it can be fed by a number of the Company’s uranium and uranium/vanadium projects in Colorado, Utah, Arizona and New Mexico, 
as well as by ore purchase or toll milling arrangements with third party miners in the region, as market conditions warrant. The Company 
also owns the Sheep Mountain Project in Wyoming, which is a conventional uranium project. Due to its distance from the White Mesa 
Mill, the Sheep Mountain Project is not expected to be a source of feed material for the Mill. The Sheep Mountain Project consists of 
the Sheep Mountain Extraction Operation, which is permitted, and the proposed Sheep Mountain Processing Operation, which is not 
permitted at this time. 

The Company’s principal conventional properties include the following: 

• 
• 
• 
• 
• 

• 
• 
• 

the White Mesa Mill. See “The White Mesa Mill” below; 
the Canyon Mine. See “The Canyon Mine” below; 
the Roca Honda Project. See “The Roca Honda Project” below; 
the Sheep Mountain Project. See “The Sheep Mountain Project” below; 
the Henry Mountains Complex comprised of the Tony M Property and the Bullfrog Property. See “The Henry Mountains 
Complex” below; 
the La Sal Project. See “The La Sal Project” below; 
the Daneros Project. See “The Daneros Project” below; 
the Arizona Strip uranium properties located in north-central Arizona, including: the Arizona 1 Project, the Wate Project, and 
EZ Project. See “Non-Material Mineral Properties – Other Conventional Projects – Arizona Strip” below; and 

•  The Colorado Plateau uranium properties located in the Four Corners region of Colorado and Utah, including: the Whirlwind 
Project and the Sage Plain Project. See “Non-Material Mineral Properties – Other Conventional Projects – Colorado Plateau” 
below. 

The material projects are shown on the map above and are described in further detail below. Properties that the Company does not 
consider material are summarized at the end of this Item 2. 

Uranium and Vanadium Recovery History 

The following tables show the mineralized material processed and pounds of uranium and vanadium recovered from the Company’s 
projects and facilities from January 1, 2013 to December 31, 2017:(1)

38 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Recovery History (1)

Project or Source 

2017 

2016 

2015 

2014 

2013 

Alternate Feed Materials(2)

Tons (000)  NA(2) 

NA(2) 

NA(2) 

NA(2) 

NA(2) 

Ave. % U3O8 

18.86% 

27.98% 

9.21% 

16.94% 

5.03% 

Recovered Pounds U3O8 (000) 

1,004(3)

172(3)(4) 

229(3) 

391(3) 

351(3) 

Tailing Solution Recycle & In-Circuit Material(5)

Conventional Feed Materials 

Recovered Pounds U3O8 (000) 

308 

77 

67 

--- 

--- 

Tons (000) 

--- 

45 

Contained Grade % U3O8 

Recovered Pounds U3O8 (000) 

--- 

--- 

0.50% 

431 

--- 

--- 

--- 

49 

126 

0.56% 

0.26% 

552 

655 

Recovered Pounds U3O8 (000) 

259 

335 

273 

200 

--- 

Nichols Ranch(6)

Alta Mesa 

Total Pounds of U3O8 Recovered (000) 

Total Pounds of V2O5 Recovered (000) 

Notes: 

Recovered Pounds (000) 

--- 

--- 

1,571 

1,015 

--- 

--- 

--- 

569 

--- 

3(7) 

139(7) 

1,146 

1,145 

--- 

1,303 

(1)  Mineralized material is shown as being processed and pounds recovered during the year in which the materials were processed 
at the White Mesa Mill or at the Nichols Ranch Plant, which is not necessarily the year in which the materials were extracted from 
the project facilities. 
(2)  All  alternate  feed  materials  were  processed  at  the White  Mesa  Mill. A number  of  different  alternate  feed  materials  were 
processed during the period 2013 – 2017. The table shows the average uranium grades and the total pounds recovered from all 
alternate feed materials processed at the Mill during each of the years in that period. Because of the variability in uranium grades, 
pounds recovered is considered to be the relevant metric and tons fed is not considered to be relevant. 
(3)  The 1,004,000 pounds recovered in 2017 include 952,000 pounds recovered for the accounts of third parties; the 172,000 
pounds recovered in 2016 include nil pounds recovered for the accounts of third parties; the 229,000 pounds recovered in 2015 
include 72,000 pounds recovered for the accounts of third parties; the 391,000 pounds recovered in 2014 include 85,000 pounds 
recovered for the accounts of third parties; and the 351,000 pounds recovered in 2013 include nil pounds recovered for the accounts 
of third parties. 
(4)  Material recovered originated from several different sources that  were  fed to process at  various times  in 2015  and 2016. 
Therefore, the recovered amount is independent of the reported feed amount for any given period. 
(5)  Pounds contained in tailings solutions containing previously unrecovered uranium, together with in-circuit mineralized material 
from previous conventional mine material processing, were recovered by processing alternate feed materials at the White Mesa 
Mill, though tons and grade are not available because it cannot be tied to any specific source. 
(6)  Uranium recovery commenced at the Nichols Ranch Project on April 17, 2014. Because the Nichols Ranch Project uses ISR 
instead of conventional extraction methods, grade and tons of mineralized material are inapplicable to the Nichols Ranch Project. 
The data in the table include all uranium recovered from the Nichols Ranch Project, both before and after the Company acquired 
Uranerz and the Nichols Ranch Project. Of the total pounds recovered at the Nichols Ranch Project in 2015, approximately 172,000 
pounds were recovered after June 18, 2015, and are for the account of the Company. 
(7)  Figures prior to June 17, 2016 predate the Company's ownership of the Alta Mesa Project, and are therefore for the account 
of the previous owner. 

39 

 
 
 
 
 
 
 
Mineral Extraction 

The following table shows the extraction history from 2013 to December 31, 2017 from the mineral properties currently owned by the 
Company. Much of the material was stockpiled at the White Mesa Mill for a year or more before being processed. Since mineralized 
material is processed on a continuing basis during a Mill run and remains in-circuit for a considerable time mixed with all other mill 
feed, it is not possible to tie uranium and vanadium recovery to each project on an annual basis. Therefore, pounds of extracted uranium 
and vanadium are not included in this table, except for the Nichols Ranch and Alta Mesa Projects where annual extraction can be 
tracked. The mineral extraction table below is based on estimates of mineralized material grade as material comes out of the mine 
whereas the recovery table above reflects actual head grades as material is fed to process at the Mill.  Therefore, the grades in the two 
tables differ. 

Project(1)

2017 

2016 

2015 

2014 

2013(1)

Arizona 1(2)

Pinenut(3)

Nichols Ranch 

Alta Mesa 

Notes: 

Tons (000) 

--- 

--- 

--- 

4 

16 

% U3O8 

0.56% 

0.58% 

Tons (000) 

--- 

--- 

30 

43 

8 

% U3O8 

0.54% 

0.55% 

0.53% 

Pounds (000) 

259 

335 

273(4) 

200 

--- 

Pounds (000) 

--- 

--- 

--- 

3(5) 

139(5) 

(1)  All properties reported in this table were owned by the Company on December 31, 2017, and continue to be owned by the 
Company. Alta Mesa was acquired by the Company in June 2016 as part of the EFR Alta Mesa acquisition, and Nichols Ranch 
was acquired by the Company in June 2015 as part of the Uranerz acquisition. Properties sold or otherwise disposed of are not 
included in this table. Production for the US Mining Division prior to June 29, 2012 predates the Company's ownership of the US 
Mining Division, and was therefore for the account of the previous owner. 
(2)  The Arizona 1 Project was placed on Standby in February 2014. 
(3)  The Pinenut Project was placed into reclamation in August 2015 due to depletion of the identified resources. 
(4)  Uranium recovery commenced at the Nichols Ranch Project on April 17, 2014. Of the total pounds recovered at the Nichols 
Ranch Project in 2015, approximately 172,000 pounds were recovered after June 18, 2015, and are for the account of the Company. 
(5)  Production prior to June 17, 2016 predates the Company's ownership of the Alta Mesa Project, and is therefore for the account 
of the previous owner. 

Summary of Mineral Reserves and Resources 

John H. White, Colorado PE # 0047237, the Company’s VP of Technical Services, is responsible for the disclosure of scientific or 
technical information concerning mineral projects in this Annual Report. 

The following tables show the Company's estimate of Mineral Reserves and Mineral Resources as of December 31, 2017. NI 43-101 
requires mineral companies to disclose Mineral Reserves and Mineral Resources using the subcategories of Proven Mineral Reserves, 
Probable Mineral Reserves, Measured Mineral Resources, Indicated Mineral Resources and Inferred Mineral Resources. Energy Fuels 
reports  Mineral  Reserves  and  Mineral  Resources  separately.  Properties  sold or  otherwise  disposed  of,  or  committed to  be  sold or 
otherwise disposed of, during 2017 or 2018 are not included in the table. Such properties include Reno Creek and Torbyn, which are 
not included in the table. Except as stated below, the Mineral Reserve and Mineral Resource information shown below is as reported 
in the various technical reports prepared in accordance with NI 43-101 (the “Technical Reports”) by qualified persons employed by 
Peters Geosciences, BRS Inc., SRK Consulting (U.S.) Inc., and Roscoe Postle Associates Inc. See “Mineral Projects” below. The table 
below also reflects the Company’s adjustments to the resources as of December 31, 2017 at the properties where exploration and well 
installation drilling and/or extraction were in progress in 2017; notably at the Nichols Ranch Project. The Pinenut Project has been 

40 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
removed from the table since extraction of all known resources was completed during 2015. An updated Technical Report for The 
Daneros Project was filed on March 9, 2018. The updated Mineral Resource for Daneros is given in the Mineral Resource table below. 

Mineral Reserve Estimates - Uranium(1)(2)(3)(4)

Proven Mineral Resources 

Probable Mineral Reserves 

Tons (000) 
--- 

Grade 
% eU3O8 
--- 

Pounds 
eU3O8 (000) 
---   

Tons (000) 
3,955 

Grade 
% eU3O8 
0.115% 

Pounds 
eU3O8 (000) 
9,117 

--- 

--- 

--- 

--- 

---   

---   

3,498 

0.132% 

9,248 

7,453 

0.123% 

18,365 

Sheep Mountain - Congo Pit 

Sheep Mountain - Underground 

Total Mineral Reserves 

Notes: 

(1)  The Mineral Reserve estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. 
(2)  Mineral Reserves are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.10 G.T. (2 ft. of 0.05% eU3O8) for 
the Congo Pit and 0.45 G.T. (6 ft. of 0.075% eU3O8) for Sheep Underground. 
(3)  Mineral Reserves are estimated using a long-term uranium price of US$65 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

Mineral Resource Estimates – Uranium(1)(2)(3)(4)

Measured Mineral Resources 

Indicated Mineral Resources 

Inferred Mineral Resources 

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 
(000) 

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 
(000) 

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 
(000) 

ISR Properties 
1,000   

2,471 

0.140% 

0.111% 

5,500   

561 

0.099%  1,112 

0.151% 

371 

1,512 

0.107% 

3,246 

6,964 

0.120%  16,794 

357 

123 

2,281 

0.061% 

2,782 

1,550 

0.049% 

1,511 

190 

0.037% 

142 

310 

0.062% 

387 

1,198 

0.130% 

3,115 

2,823 

0.106% 

6,008 

4,540 

13,372 

24,056 

Conventional Properties 

6 

0.43% 

56   

132 

0.90% 

2,378   

18 

0.38% 

134 

208 

0.48% 

1,984 

1,303 

0.48% 

12,580 

1,198 

0.47  11,206 

--- 

--- 

--- 

--- 

--- 

--- 

1,009 

0.18% 

3,732 

--- 

240 

--- 

0.16% 

--- 

772 

6,544 

11,084 

41 

12,895 

0.12% 

30,285 

--- 

--- 

--- 

2,410 

0.27% 

12,800 

1,610 

0.25% 

8,080 

132 

20 

201 

0.14% 

0.36% 

367 

142 

185 

0.10% 

362 

7 

0.37% 

52 

0.28% 

1,122 

742 

0.35% 

5,248 

59,674 

73,047 

25,082 

49,138 

Nichols Ranch(5)

Alta Mesa(6)

Reno Creek 

Other Power River Basin 
Properties(7)

ISR Subtotal 

Canyon 

Roca Honda(8)

Sheep Mountain(9)

Henry Mountains(10)

La Sal(11)

Daneros 

Other Properties(12)

Conventional Subtotal 

Total Mineral Resources 
(eU3O8) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Notes: 

(1)  The Mineral Resource estimates in this table comply with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources were estimated at various %eU3O8 or G.T. cut-off grades.  Details regarding cut-off grade calculations for 
each project are given in the project’s respective section below. 
(3)  Mineral Resources were estimated at various long-term uranium prices. The specific long-term uranium price for each project 
is given in the project’s respective section below. 
(4)  Numbers may not add due to rounding. 
(5)  The numbers shown represent Energy Fuels share of the Nichols Ranch Project, which is less than 100% due to a portion that 
is held by Akose Mining Venture.  The total Nichols Ranch Project Mineral Resources (100%) are shown in the Nichols Ranch 
section of this report, and include 1.0 million, 6.2 million, and 1.2 million pounds of measured mineral resources, indicated mineral 
resources, and inferred mineral resources, respectively.  The  Nichols Ranch Project is comprised of three properties: the Nichols 
Ranch Wellfield, the Hank Property and the Jane Dough Property. A portion of the Jane Dough Property is held through the Arkose 
Mining Venture, in which the Company has an 81% interest.  The Mineral Resources shown in the table  differ from those in the 
2015 Nichols Ranch Technical Report  due to adjustments  made by the  Company by subtracting recovered  material (857,041 
pounds) and adding additional resources discovered by drilling during well field installation (162,500 pounds). 
(6)  Includes Alta Mesa and Mesteña Grande. 
(7)  The other Powder River Basin ISR properties include: the North Rolling Pin Property, the West North Butte Property, the East 
North Butte property, the Willow Creek property, and the East Buck, Little Butte, Sand Rock and South Doughstick properties in 
the Arkose Joint Venture. The Mineral Resources for the Arkose properties are included in the table as 81% of the total, which is 
Energy Fuels share. 
(8)  The numbers do not include the historical resource estimate for the Adjacent Roca Honda Properties. See “The Roca Honda 
Project,” below. 
(9)  The Sheep Mountain Indicated Mineral Resource includes Probable Mineral Reserves calculated in accordance with NI 43-101 
of 18,365,000 pounds of eU3O8  in 7,453,000 tons at a grade of 0.123%. Such mineral resources do not constitute reserves under 
SEC Industry Guide 7. 
(10) The Henry Mountains Complex includes the Tony M, Southwest, Indian Bench and Copper Bench properties. 
(11) The La Sal Project includes the Energy Queen, Redd Block, Beaver, and Pandora properties. 
(12) This includes all conventional Non-Material properties, including: Wate, EZ Project, Whirlwind, and the retained portion of 
Sage Plain. 

Mineral Resource Estimate – Vanadium(1)(2)(3)(4)(5)

Measured Mineral Resources 
Pounds 
V2O5 
(000) 
19,596   

Grade 
% V2O5 

Tons 
(000) 

0.97% 

1,009 

Indicated Mineral Resources 
Pounds 
V2O5 
(000) 
1,930   

Grade 
% V2O5 

Tons 
(000) 

0.73% 

132 

Inferred Mineral Resources 
Pounds 
V2O5 
(000) 

Grade 
% V2O5 

Tons 
(000) 

185 

0.51% 

1,902 

240 

1.32% 

6,350 

201 

0.94% 

3,797 

447 

0.74% 

6,660 

25,946 

5,727 

8,562 

Las Sal(6)

Other Properties(7)

Total Mineral Resources 
(V2O5) 

Notes: 

(1)  The Mineral Resource estimates in this table comply with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources were estimated at various %U3O8 or G.T. cut-off grades. Details regarding cut-off grade calculations for 
each project are given in the project’s respective section below. 
(3)  Mineral Resources were estimated at various long-term uranium prices. The specific long-term uranium price for each project 
is given in the project’s respective section below. 
(4)  Various vanadium to uranium ratios were used to calculate the vanadium grades and pounds given in the table. The specific 
ratio used for each project is given in the project’s respective section below. 
(5)  Numbers may not add due to rounding. 
(6)  The La Sal Project includes the Energy Queen, Redd Block, Beaver, and Pandora properties. 
(7)  Other Properties includes Whirlwind and the retained portion of Sage Plain. 

42 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Mineral Resource Estimate – Copper(1)(2)(3)(4)(5)(6)

Measured Mineral Resources 

Indicated Mineral Resources 

Inferred Mineral Resources 

Tons 
(000) 
6 

Grade 
% Cu 
9.29% 

Pounds 
Cu (000) 
1,203   

Tons 
(000) 
94 

Grade 
% Cu 
5.70% 

Pounds 
Cu (000) 
10,736   

Tons 
(000) 
5 

Grade 
% Cu 
5.90% 

Pounds 
Cu (000) 
570 

1,203 

10,736 

570 

Canyon 
Total Mineral 
Resources (Cu) 

Notes: 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  For the Main and Main-Lower zones of the Canyon Mine, a 0.36% uranium equivalent cut-off grade (% U3O8 Eq) was applied 
to account for both the copper and uranium mineralization.  In all other zones only uranium was reported and a 0.29% U3O8 cut- 
off grade was applied. (The %U3O8  Eq grade term is not the same as the eU3O8 % grade term with indicates probe rather than 
assay data listed elsewhere in this report.  For details see the Canyon Technical Report). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$60 per pound and a Copper price of US$3.50 per lb. 
(4)  A copper to U3O8 conversion factor of 18.19 was used for converting copper grades to equivalent U3O8 grades (U3O8 Eq) for 
cut-off grade evaluation and reporting. 
(5)  Numbers may not add due to rounding. 
(6)  For Canyon, Mineral Resource tonnages of uranium and copper cannot be added as they overlap in the Main and Main-Lower 
Zones. 

43 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Nichols Ranch Project 

Unless stated otherwise, the following description of the Nichols Ranch Project is derived from a technical report titled “Nichols Ranch 
Uranium Project, 43-101 Technical Report, Preliminary Economic Assessment” dated February 28, 2015, prepared by Douglas L. 
Beahm, P.E., P.G. of BRS Inc. and Paul Goranson, P.E. of the Company, in accordance with NI 43-101 (the “Nichols Ranch Technical 
Report”). The Nichols Ranch Technical Report includes an updated NI 43-101 mineral resource estimate and the results of a Preliminary 
Economic Assessment (“PEA”) for the uranium resources identified to date at the Nichols Ranch Project. Each of the authors is a 
“qualified person” within the meaning of NI 43-101, and Mr. Beahm is “independent” of the Company within the meaning of NI 
43-101. Because the independent author of the Nichols Ranch Technical Report assumed overall responsibility for all items of the 
technical report,  the report  is  therefore  an  independent technical  report  under NI  43-101. The Nichols  Ranch Technical Report  is 
available on SEDAR at www.sedar.com. The Nichols Ranch Project does not have known reserves, and is therefore considered under 
SEC Industry Guide 7 definitions to be exploratory in nature, despite currently ongoing uranium recovery activities. 

Property Description and Location 

The Nichols Ranch Project is the Company’s currently active ISR uranium recovery project, which it acquired in June 2015 through 
the acquisition of Uranerz. It is located in the Powder River Basin of northeast Wyoming. The Nichols Ranch Project includes: (i) the 
Nichols Ranch Plant; (ii) the Nichols Ranch Wellfield; (iii) the Jane Dough Property; and (iv) the Hank Project, which includes the 
planned Hank Satellite Plant and the Hank Property. The Nichols Ranch Project is an ISR project; it is not an underground or open pit 
project. 

A map of the Nichols Ranch Project, including the Nichols Ranch Plant, the Nichols Ranch Wellfield, the Jane Dough Property and 
the Hank Property is shown below: 

44 

 
 
 
 
 
 
The Nichols Ranch Project is an operating ISR facility that recovers uranium through a series of injection and recovery wells. Using 
groundwater fortified with oxygen and sodium bicarbonate, uranium is dissolved within a deposit. The groundwater is then collected 
in a series of recovery wells and pumped to the Nichols Ranch Plant. The Nichols Ranch Plant creates a yellowcake  slurry that is 
transported by truck to the White Mesa Mill where it is dried and packaged into drums that are later shipped to a conversion facility. 

The original plan for the Nichols Ranch Project included the construction of an ISR processing facility and a second uranium recovery 
and extraction facility at the Hank Project. Our current extraction plan for the Nichols Ranch Project is now divided into three separate 
areas, being (i) the Nichols Ranch Wellfield, (ii) the Jane Dough Property, and (iii) the Hank Property. The Nichols Ranch Wellfield 
is, and the Jane Dough Property is expected to be, directly connected to the Nichols Ranch Plant via pipeline. The Hank Project is 
expected to consist of a uranium extraction and recovery facility that will create a loaded resin that will be trucked to the Nichols Ranch 
Plant for elution. The Nichols Ranch Wellfield consists of our two initial production areas, being Production Area #1 and Production 
Area #2. The Nichols Ranch Wellfield also includes the two deep disposal wells that are permitted and constructed for the Nichols 
Ranch Project. The Jane Dough Property is adjacent to the Nichols Ranch Wellfield to the south and contains certain properties that 
are 100% owned by Energy Fuels and other properties that are held in the Arkose Mining Venture, in which we own an 81% interest. 
The Jane Dough Property contains two fully licensed and permitted extraction areas. The Hank Project is 100% owned by Energy Fuels 
and is located approximately six miles east of the Nichols Ranch Wellfield. The Hank Satellite Plant is fully licensed and permitted to 
be constructed and operate as a satellite to the Nichols Ranch Plant, and the Hank Property contains two targeted extraction areas. 

Construction of the Nichols Ranch Plant was substantially completed in 2013, and extraction commenced in the second quarter of 2014 
after final NRC inspections were completed. The Jane Dough Property described above has two fully licensed and permitted extraction 
areas. The Company completed construction of an elution and precipitation circuit at the Nichols Ranch Plant in early-February 2016. 
Yellowcake slurry is now transported from the Nichols Ranch Plant to the White Mesa Mill for drying and packaging. However, the 

45 

 
 
 
 
 
 
Nichols Ranch Plant is currently licensed to allow for the construction and operation of a drying and packaging circuit should conditions 
warrant. 

The Nichols Ranch Project does not have known reserves under SEC Industry Guide 7, and is therefore considered under SEC Industry 
Guide 7 definitions to be “exploratory” in nature. During 2017, a total of approximately 259,000 pounds of U3O8 were recovered from 
the Nichols Ranch Project and nil pounds of mineralized material were added through drilling. 

Accessibility, Local Resources, Physiography and Infrastructure 

The Nichols Ranch Project site is located approximately 50 road miles southwest of Gillette, Wyoming and 76 road miles northeast of 
Casper, Wyoming in portions of Campbell and Johnson Counties, Wyoming in the Townships 41 to 45 North and Ranges 73 to 77 
West. It is accessed from State Highway 50 from the east or State Highway 387 from the south, and various internal gravel-surface 
county and private roads. Casper is on Interstate 25, approximately one hour by air from either Denver, Colorado or Salt Lake City, 
Utah. The Nichols Ranch Project is accessible via two-wheel drive vehicle on existing county and/or private gravel and dirt roads. 
The Nichols Ranch Project is located within the Wyoming Basin physiographic province in the central portion of the Powder River 
Basin, within the Pumpkin Buttes Mining District. The Pumpkin Buttes are a series of small buttes rising several hundred feet above 
the surrounding plains. Portions of the Powder River Basin properties are located east, west and south of these buttes. The cap rocks 
on top of the buttes are erosional remnants of the Tertiary White River Formation that is believed to have overlain the majority of the 
Powder River Basin. The volcanic tuffs in the White River Formation have been cited as a source of uranium in this basin. 

The area in which the Powder River Basin properties is located is a low lying plain, and elevations range from approximately 4,390 
feet (1,440 meters) in the northwest to approximately 5,450 feet (1,790 meters) in the southeast. Historically and currently, the land is 
used for livestock and wildlife grazing. Vegetation is characteristically sagebrush grassland with some pines on elevated terrain and 
some deciduous trees within drainages. 

The climate is semi-arid and receives an annual precipitation of approximately 9.4 inches, the most falling in the form of late autumnal 
to early spring snows. The summer months are usually hot, dry and clear except for infrequent heavy rains. Cold, wind and snow/ 
blizzards can make winter exploration work in this area difficult but not impossible. The weather may limit the time periods for capital 
construction but should not have any significant adverse impacts on the operation of an ISR facility. 

Infrastructure at the site of the Nichols Ranch Project is dominantly related to local oil, gas, and coal bed methane exploration and 
development. Mineralized locations could affect future siting of wellfields and processing facilities. Generally, the proximity of the 
Nichols Ranch Project to paved roads is beneficial with respect to transportation of equipment, supplies, personnel and product to and 
from the property. Power transmission lines are located on or near parts of the property. We have secured power from the local electrical 
service provider to accommodate our needs. Water is available from wells developed at planned facility locations, and water for ISR 
operations  comes  from  the  operation  itself,  i.e.  the  extracted  groundwater.  Therefore,  the  basic  infrastructure  (power,  water  and 
transportation) that is required to support an ISR mining operation is located within reasonable proximity to the Nichols Ranch Project. 

Ownership 

Our property interests vary widely, and include unpatented mining claims, private and state leasehold interests and surface use rights. 
Some agreements renew annually, some renew automatically when mineral extraction has commenced, and some are agreements for 
fixed terms. For the property agreements that expire in 2018, the Company may negotiate new agreements for only those acres that 
are within permit boundaries or critical project areas. Leases outside of such desired project areas may be allowed to expire, although 
the Company may seek to negotiate new agreements for those dropped properties in the future should market conditions warrant. We 
do not expect that the expiry of any property interests in 2018 and beyond, nor the forfeiture of any unpatented mining claims in 2018, 
will have a material effect on our ability to continue exploration and extraction activities on our properties. 

Our unpatented lode mining claims are located on minerals owned by the federal government and open to location, with the surface 
being owned by either the federal government or private individuals. In addition, the unpatented lode mining claims are recorded in 
the appropriate county and filed with the state office of the BLM. The unpatented lode claims do not have an expiration date. However, 
affidavits must be filed annually with the BLM and respective county recorder’s offices in order to maintain the claims’ validity. All 
of the unpatented lode mining claims have annual filing requirements ($155 per claim) with the BLM, to be paid on or before September 
1 of each year. Most of the above-mentioned unpatented lode mining claims are located on Stock Raising Homestead land where the 
United States government has issued a patent for the surface to an individual and reserved the minerals to the United States government 
subject to the location rights by claimants as set forth in the federal Mining Act of 1872. 

Our leasehold interests are subject to the various terms as set forth in the applicable leases. The state leases and leases on fee mineral 
lands usually have annual payments, royalty obligations, and the terms of the leases vary, but for the most part can be extended by 

46 

 
 
 
 
 
 
 
 
 
 
 
production (as defined in the leases). The fee surface and mineral leases apply only to uranium and other fissionable minerals and 
typically have a 10-year term with the right to extend the leases with production (as defined in the leases). Commingling of extraction 
from adjacent lands is allowable under the fee mineral leases. 

Surface rights under applicable laws allow for exploration disturbance, road construction and facility siting. The claimant must first 
notify the surface owner of its intention to locate unpatented lode mining claims on the owner’s surface and then reach an agreement 
with the surface owner to pay for damages caused by the claimant’s operations. If an agreement cannot be reached, the claimant may 
post a bond with the BLM to cover the amount of the damages caused by the claimant’s operations. We have negotiated surface use 
agreements with various surface owners that provide us with all required surface access for the Nichols Ranch Project. The surface 
use agreements typically provide for reimbursement to the surface owner of actual damages resulting from our operations. 

Nichols Ranch Plant – 100% Energy Fuels 
The Nichols Ranch Plant is located on the Nichols Ranch Project property pursuant to the surface use agreements described below. 

Nichols Ranch Wellfield – 100% Energy Fuels 
The Nichols Ranch Project, which includes the Nichols Ranch Plant and the Nichols Ranch Wellfield mining permit area, consists of 
36 unpatented lode mining claims, two fee surface and mineral leases, and one surface use agreement encompassing approximately 
920 acres. The Nichols Ranch Wellfield permit boundary encompasses approximately 1,120 acres. There is an overriding royalty interest 
in favor of Excalibur Industries on all federal unpatented lode mining claims that were acquired from Excalibur Industries, defined as 
a gross royalty of six percent when the spot price of uranium is less than $45.00 per pound and of eight percent if the uranium spot 
price is $45.00 per pound or higher. In addition, there is a portion of the Nichols Ranch Wellfield that includes private (fee) mineral 
that is subject to the above Excalibur Industries royalty, plus an additional royalty payable to the fee mineral owner under the fee leases. 
Cumulatively, the combined royalties range from 12 percent to 16 percent, depending upon the price of uranium). The Company has 
entered into an agreement to acquire these Excalibur Industries royalties, which it intends to cancel upon acquisition. See General 
Development of the Business: 2017 Corporate Developments. The primary term of the leases would have expired in 2017; however, 
they are held by production (as defined in the leases). The primary term of the surface use agreement would have expired in 2016, 
however the term has been held by production. 

Hank Property – 100% Energy Fuels 
At the Hank Project, for which the Company has received a license to construct and operate a satellite plant to the Nichols Ranch Plant 
(known as the Hank Satellite Plant), we have 66 unpatented lode mining claims, two fee surface and mineral leases, which are not 
significant, and one surface use agreement encompassing approximately 1,393 acres. The Hank Project permit boundary encompasses 
approximately 2,250 acres. Of the 66 unpatented lode mining claims comprising the Hank Project, 56 of the claims have a royalty 
interest burden, payable to Excalibur Industries, of 6 or 8 percent depending on the price of uranium. This royalty interest is based on 
uranium produced from these claims. As mentioned above, the Company has entered into an agreement to acquire these Excalibur 
Industries  royalties,  which  it  intends  to  cancel  upon  acquisition.  See  General  Development  of  the  Business:  2017  Corporate 
Developments. The primary term of the leases would have expired in 2016, however they have been held beyond the primary term by 
production (as defined in the leases). In 2017, the Company renewed all of these leases through 2026. 

Jane Dough Property (Jane Dough/Doughstick – 100% Energy Fuels; North Jane and S. Doughstick – 100% Arkose Mining Venture,    
held 81% by Energy Fuels) 
In 2017, the Company received its license amendment from the NRC, which includes the Jane Dough Property in the Nichols Ranch 
Project permit area, and combines the Jane Dough/Doughstick, North Jane and S. Doughstick properties consisting of 115 unpatented 
lode mining claims, 16  mineral leases, and three surface  use agreements encompassing approximately 3,121  acres.  Our operating 
interest in the Jane Dough Property includes Energy Fuels’ 100% owned property and 81% from the two properties held by the Arkose 
Mining Venture. The Jane Dough Property permit amendment encompasses approximately 3,680 acres. The fee land in the project is 
covered by mineral leases some of which have annual payments and some of which are five year paid up leases. The mineral leases 
have primary terms of ten years and can be held by ongoing uranium extraction (as defined in the leases). Some of the leases expire 
in 2018, and 2019. The fee surface is covered by three separate surface use agreements, which include damage payments paid on an 
annual basis. The mining leases have a variety of royalty payments based on a fixed rate, a two tier system, or a sliding scale system. 

One of the leases has a fixed royalty rate of 4% of the gross proceeds. Two of the leases have a two-tier royalty based on the price of 
U3O8 at the time of the sale, and they are 6% for a U3O8 price less than $75 per pound, and 8% for a U3O8 price equal to or greater than 
$75 per pound. Five of the leases have a sliding scale royalty that runs from a low of 2% at a U3O8 price of $25 per pound up to a high 
of 10% for a U3O8  price of equal to or greater than $100 per pound. Four leases have a sliding scale royalty that runs from a low of 
4.0% at a U3O8  price of $40 per pound up to a high of 10% for a U3O8  price of equal to or greater than $100 per pound. Four of the 
leases have a sliding scale royalty that runs from a low of 4.5% at a U3O8 price of $49.99 up to a high of 10% for a U3O8 price of equal 
to or greater than $100 per pound. There is an overriding royalty interest held by Excalibur Industries that covers some of the unpatented 
claims located in Sections 20, 21, 28 and 29, Township 43 North, Range 76 West, which is a two-tiered royalty based on quarterly 

47 

 
 
 
 
 
 
 
production of U3O8 and adjusted annually by the actual amount of U3O8 sold during the previous year. The Excalibur royalty amounts 
are based on the average quarterly spot price for U3O8, and they are 6% for a U3O8 price equal to or less than $45 per pound and 8% 
for a U3O8 price greater than $45 per pound. As mentioned above, the Company has entered into an agreement to acquire these Excalibur 
Industries  royalties,  which  it  intends  to  cancel  upon  acquisition.  See  General  Development  of  the  Business:  2017  Corporate 
Developments. There are twenty (20) unpatented mining claims located in Section 32, Township 43 North, Range 76 West that have 
an overriding royalty interest of 0.25%. This overriding royalty interest is based on production of uranium on said claims. Two of the 
surface use agreements have a two tiered royalty based on the sales price of the U3O8 received by Uranerz, and they are 1% for a sales 
price of less than $50 per pound; and 2% for a sales price of equal to or greater than $50 per pound. 

Uranium Severance Tax 
We are required to pay a standard uranium industry severance tax of approximately 4% of sales and an ad valorem tax (annual property 
tax based on assessed values) to the State of Wyoming, in addition to various maintenance, land impact and access fees and other 
consideration to surface owners. 

Permitting and Licensing 

Energy Fuels has received all regulatory approvals necessary to conduct extraction and uranium processing activities at the Nichols 
Ranch Plant and Nichols Ranch Wellfield. In December 2010, Uranerz received its Permit to Mine for the Nichols Ranch Project from 
the Wyoming Department of Environmental Quality (“WDEQ”) - Land Quality Division (“WDEQ-LQD”). In July 2011, Uranerz 
received a Source Material License from the NRC for the Nichols Ranch Plant and Nichols Ranch Wellfield, and construction of the 
Nichols Ranch Plant immediately began. 

Both the state and federal agencies analyzed all environmental aspects of the Nichols Ranch Project including reclamation of the land 
surface following extraction operations and restoration of impacted ground water. Workplace safety and the safety of the public are 
also closely monitored by regulatory agencies. We have posted a reclamation bond with the regulatory agencies in an amount of $6.8 
million to cover the total estimated cost of reclamation by a third party as a requirement of the licenses. 

The various state and federal permits and licenses that were required and have been obtained for the Nichols Ranch Project, exclusive 
of the expansion to the Jane Dough Property, are summarized below: 

Primary Permits and Licenses for the Nichols Ranch Project (Nichols Ranch and Hank Units Only) 

Permit, License, or Approval Name 

Agency 

Source Material License 

NRC 

Permit to Mine (UIC Permit) 

WDEQ-LQD 

Aquifer Exemption 

WDEQ-LQD; EPA 

Permit to Appropriate Groundwater 

SEO 

Wellfield Authorization 

WDEQ-LQD 

Deep Disposal Well Permits 

WDEQ-WQD 

WYPDES 

WDEQ- WQD 

Plan of Operations (Hank Unit only) 

BLM 

Air Quality Permit 

WDEQ-AQD 

Status 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

Notes:   NRC - Nuclear Regulatory Commission 
EPA – Environmental Protection Agency 
WDEQ-LQD - Wyoming Department of Environmental Quality Land Quality Division 
WDEQ-WQD - Wyoming Department of Environmental Quality Water Quality Division 
WDEQ-AQD - Wyoming Department of Environmental Quality Air Quality Division 
WYPDES – Wyoming Pollutant Discharge Elimination System 
SEO - State Engineer's Office 

48 

 
 
 
 
 
 
 
 
Under the licensed plan, the Nichols Ranch Plant has been built, and a satellite processing facility is licensed for the Hank Project. In 
2017, the NRC approved a source material license amendment to add the Jane Dough Property to the existing license for the Nichols 
Ranch Project, and the Wyoming Department of Environmental Quality approved an amendment to our Permit to Mine to incorporate 
the Jane Dough Property. The Jane Dough Property is now fully licensed and permitted as part of the Nichols Ranch Project. The Jane 
Dough Property is adjacent to the Nichols Ranch Wellfield and is expected to share its infrastructure. We are now able to bring the 
Jane Dough Property into extraction operations before the Hank Project. Due to its close proximity, extracted solutions from the Jane 
Dough Property may be delivered directly to our Nichols Ranch Plant by pipeline, thus eliminating the need for a larger capital outlay 
to construct a satellite plant as is planned for the Hank Project. Our Jane Dough Property includes the Doughstick, South Doughstick 
and North Jane properties. Additional wellfields may be added to the extraction operations plan as we continue to assess geological 
data. 

Geology 

The Nichols Ranch Project is located in the Powder River Basin. The mineralized trends within the Nichols Ranch Project are alteration- 
reduction trends hosted in the Eocene age channel sands that lie at depths of approximately 300 to 1,100 feet from the surface. Roll 
front deposits of uranium bearing material are anticipated to occur within these properties. An alteration-reduction trend is a natural 
chemical boundary trend line in a sandstone aquifer where reduced (non-oxidized) sand is in contact with altered (oxidized) sand. 
Uranium mineralization may be found along the trend line. 

The properties in the Nichols Ranch Project contain alteration-reduction trends hosted in Eocene age channel sands. Alteration-reduction 
trends in the Pumpkin Buttes Mining District are typically composed of multiple, stacked roll front deposits that often contain associated 
uranium mineralization. A stacked roll front is a type of uranium occurrence found in thick sandstone where a number of mineralization 
trends are stacked on top of each other. Uranium mineralization within and adjacent to the Nichols Ranch Project are found in the 
Eocene Wasatch Formation (“Wasatch”). The Wasatch is a fluvial deposit composed of arkosic sandstones that are typically 25% or 
more feldspar grains and indicates a source rock where chemical weathering was not extreme and the sediments have not been transported 
far. A fluvial deposit is a deposit of uranium mineralization found in sandstones that originated from sediments laid down by streams 
and rivers. The arkosic sandstone is a type of sandstone that contains a high percentage of feldspar grains. The medium grain size and 
relatively good  sorting of this sediment implies  water transportation, probably  in a  meandering river/stream system. The Wasatch 
Formation is interlaid with sandstones, claystones, siltstones, carbonaceous shale, and thin coal seams that overlie the Paleocene Fort 
Union Formation, another fluvial sedimentary unit. 

History 

The Nichols Ranch Project is located within the Pumpkin Buttes Mining District, which was the first commercial uranium extraction 
district in Wyoming. Uranium was first discovered in the Pumpkin Buttes in 1951. Intermittent uranium extraction from about 55 small 
mines occurred through 1967 producing 36,737 tons of material containing 208,143 pounds of uranium. This early mining activity 
focused on shallow oxidized deposits exploited by small open pit mines. The material was generally transported to the Atomic Energy 
Commission (“AEC”) buying station in Edgemont, South Dakota. Modern mining in the district has focused on deeper reduced deposits, 
including facilities operated by Cameco Corporation and Uranium One Inc. 

The properties included in the Nichols Ranch Project were originally part of a large exploration area encompassing Townships 33 
through 50 North of Ranges 69 through 79 West, on the 6th principal meridian. In 1966, Mountain West Mines Inc. (“MWM,” now 
known as Excalibur Industries) began a successful drilling exploration program in a portion of this area. In 1967, MWM entered into 
an agreement with Cleveland-Cliffs Iron Company (“CCI”) for further exploration and an option if suitable resources were found. CCI 
exercised its option in 1976 with plans to begin underground mining operations in the vicinity of North Butte. Changing economic 
conditions and the introduction of ISR mining technology reportedly ended much of CCI’s interest in the area. By the late 1980’s, CCI 
began selling select properties or allowing them to revert to the federal government. 

Between 1968 and 1980, CCI drilled 117 holes and installed 3 water wells on the Nichols Ranch Project area. Texas Eastern Nuclear 
Inc. in 1985 completed limited drilling and exploration on the property (approximately 28 borings) and in early 1990s Kerr McGee 
Corporation and Rio Algom Mining Corporation also completed limited drilling in the area. 

Mineralization 

The targeted mineralized zones for the Nichols Ranch Wellfield in the A Sand unit are 300 to 700 feet below the surface and occur in 
two long narrow trends meeting at the nose. The nose is in the northwest corner of the deposit where the two narrow trends meet to 
form the tip of the geochemical front. The Hank Project’s two targeted mineralized zones in the F Sand unit range from 200 to 600 feet 
below the ground surface depending on the topography and changes in the formation elevation and stratigraphic horizon. The targeted 

49 

 
 
 
 
 
 
 
 
 
 
mineralization zone for the Jane Dough Property is the A Sand unit, the same as Nichols Ranch, at depths of 300 to 750 feet below the 
surface. 

Mineral Resource Estimates 

BRS prepared an updated NI 43-101 compliant Mineral Resource estimate for the Nichols Ranch Project in the Nichols Ranch Technical 
Report. The updated  Mineral Resource  estimate  is  effective  as  at  January  1,  2015  and  is  summarized  in  the table  below.  Mineral 
Resources were estimated using the GT Contour method. The primary data used in evaluation are equivalent uranium values as quantified 
by downhole geophysical logging reported as %e U3O8. Radiometric equilibrium was evaluated and a disequilibrium factor ("DEF") 
of 1 was used. The minimum uranium grade included in the estimate was 0.02% eU3O8. A minimum grade of 0.02% U3O8  and GT 
(grade x thickness) of 0.20 were used in these resource calculations. Mineral resources are reported at a cutoff of 0.20 GT, which is 
the cutoff applied at the Nichols Ranch Project. The table below provides a summary of Mineral Resources by classification following 
CIM guidelines. There are no Mineral Reserves on the property at this time. BRS noted that it is not aware of any known environmental, 
permitting, legal, title, taxation, socioeconomic, marketing, political, or other relevant factors that could materially affect the current 
resource estimate. 

Nichols Ranch Remaining Mineral Resources – Uranium(1)(2)(3)(4)(5)

Classification 

Property 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

Energy Fuels 
Pounds (000)(6)

Nichols Ranch Measured Resources (M) 

Nichols Ranch 

357 

0.140% 

1,000 

Nichols Ranch 

428 

0.126% 

1,079 

Hank 

450 

0.095% 

855 

Nichols Ranch Indicated Resources (I) 

Jane Dough 

1,892 

0.112% 

4,237 

Nichols Ranch Total (M & I) 

Nichols Ranch 

Hank 

Nichols Ranch Inferred Resources 

Jane Dough 

Nichols Ranch Inferred Total 

Notes: 

3,127 

0.115% 
--- 

--- 

7,171 
--- 

423 

170 

593 

0.095 

803 

0.112 

381 

0.100% 

1,184 

1,000 

1,079 

855 

3,567 

6,501 

--- 

803 

309 

1,112 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Remaining Mineral Resource includes reduction for production of 857,041 pounds from January 1, 2015 through January 1, 
2018, and an increase of approximately 162,500 pounds due to additional drilling. 
(3)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.20 G.T. (minimum 0.02% eU3O8). 
(4)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound. 
(5)  Numbers may not add due to rounding. 
(6)  “Energy Fuels Pounds” represent 100% of Nichols Ranch and Hank, and 81% of the Company's share of the portion of Jane 
Dough held by the Arkose Mining Venture. 

Information shown in the table above differs from the disclosure requirements of the SEC. See “Cautionary Note to U.S. Investors 
Concerning Disclosure of Mineral Resources,” above. 

Activities Subsequent to Nichols Ranch Technical Report 

Subsequent to the completion of the Nichols Ranch Technical Report, the Company has continued to operate and advance the Nichols 
Ranch Project, as described below.  The information contained in this subsection entitled “Activities Subsequent to Nichols Ranch 

50 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Technical Report”, was prepared by the Company and has not been reviewed or confirmed by the authors of the Nichols Ranch Technical 
Report. 

Wellfield Development and Exploration Completed by Energy Fuels 

Prior to its acquisition by Energy Fuels in June 2015, Uranerz drilled 257 exploration holes, including three core holes and three water 
wells at the Nichols Ranch Project during 2006 and 2007 and 25 exploration holes and seven wells in 2009. In addition, Uranerz drilled 
61 exploratory holes and seven wells within the Hank Property during 2006 and 2007 and eight additional wells in 2009. There has 
been no new drilling activity at the Hank Project since 2009. Uranerz drilled 691 exploration holes and 29 wells for baseline monitoring 
at the Jane Dough Property. There has been no new drilling at the Jane Dough Property since 2010. 

Uranerz drilled a total of 78 rotary drill holes on the Hank Property, Nichols Ranch Wellfield, and Jane Dough Property during 2006, 
with 46 holes demonstrating uranium mineralization. During 2006, environmental permitting activities also continued at the Hank 
Property and Nichols Ranch Wellfields with the completion of a total of five hydrogeologic test wells, and the drilling of six core holes. 
The core was submitted for laboratory testing to support permitting requirements as well as to define resource disequilibrium attributes. 

From February 19 to December 20, 2007, Uranerz drilled a total of 486 uranium trend delineation holes and eight hydrologic sampling 
wells on the Nichols Ranch Project, utilizing as many as three drill rigs and one electric log probing unit. This represents a total of 
approximately 300,000 feet of drilling with an average depth of 617 feet per hole. A total of 214 delineation holes were drilled on 
Nichols Ranch in 2007. In the final months of the 2007 drilling program, exploration efforts focused on the Hank Property and Nichols 
Ranch Wellfield to facilitate sub-surface geologic mapping with cross sections and to refine previous geologic models delineating 
known trends of uranium mineralization. 

During 2008, no new exploration work was undertaken at the Nichols Ranch Wellfield. 

During 2009, 51 delineation holes were drilled at the Nichols Ranch Wellfield, including the Doughstick and North Nichols Ranch 
properties. The purpose of this drilling was primarily to prepare for the installation of baseline monitor wells for the planned Nichols 
Ranch Plant. Additional drilling was carried out on the Doughstick properties. 

During 2011, 38 delineation holes were drilled in 2011 on the Nichols Ranch Wellfield. The purpose of this drilling was for final 
delineation drilling prior to beginning the monitor well and extraction well installation in Production Area #1 of the Nichols Ranch 
Wellfield. 

During 2012, Uranerz engaged in drilling exploration efforts and wellfield installation at Production Area #1 at the Nichols Ranch 
Wellfield. At Production Area #1, 263 extraction wells were cased and cemented. The extraction wells were connected to header houses 
with buried feeder lines. It was planned that initial extraction should begin with four header houses. Three header houses were set on 
their foundations in 2012 and connected to individual extraction wells. 

The Uranerz 2013 and 2014 drilling programs at the Nichols Ranch Wellfield were restricted to adding extraction and monitor wells. 
No new exploration drilling was conducted. 

During 2015, Uranerz engaged in drilling delineation efforts and wellfield installation at Production Area #1 of the Nichols Ranch 
Wellfield, where 283 extraction wells were cased and cemented. At Production Area #2 of the Nichols Ranch Wellfield, 51 monitor 
wells were cased and cemented. The extraction wells were connected to header houses with buried feeder lines. Initial extraction at 
the Nichols Ranch Wellfield  began  with four header houses. In 2015, two additional header houses (#5 and #6) were set on their 
foundations and connected to the individual extraction wells. 

In 2016, the Company completed drilling 12 delineation holes and drilling and casing of 86 extraction wells in Header Houses #7 and 
#8 in Production Area #1. Header House #7 was turned on in March of 2016 and Header House #8 was turned on in June of 2016. In 
Production Area #2, 133 extraction and injection wells were drilled and cased. 

Header House #9 was completed and turned on in March of 2017. No drilling or other development activities were performed in 2017 
or to date in 2018. 

Current Status of Wellfields 

All the currently planned and permitted wellfields are in Production Areas #1 and #2 of the Nichols Ranch Wellfield. The Nichols 
Ranch Wellfield is expected to have a total of 13 header-houses, with Production Area #1 comprising header-houses 1 through 8, and 
Production Area #2 comprising header-houses 9 through 13. Each of the two planned Nichols Ranch Wellfield Production Areas will 

51 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
include a number of injection wells, recovery wells, monitoring wells, header houses and associated piping and power supply. Header 
houses will be located within the Production Areas and will distribute recovered fluids from recovery wells to trunk lines, and injection 
fluids from the processing facility through the trunk lines to injection wells. See the map below illustrating Production Areas #1 & #2, 
and the plant. 

52 

 
 
 
We are currently engaged in uranium recovery activities in Production Area #1 and, as the productivity or solution grade (uranium 
concentration in the recovered ground water) of some installed patterns decreases below the economic limit, replacement patterns will 
be placed into operation in order to maintain the desired flow rate and solution grade at the processing plant. As patterns reach their 
economic limit and extraction flows cease, restoration activities will commence in these areas. 

The first five header houses and their respective wellfields in Production Area #1 at the Nichols Ranch Wellfield were installed and 
extracting uranium at the time we acquired Uranerz in June 2015. Header house #6 was turned on in November 2015. We placed our 
7th and 8th header-houses on-line in March and July 2016, respectively, thereby completing development of Production Area #1. In 
February, 2017 we completed construction on our 9th header-house, marking the beginning of development in Production Area #2. 
Uranium recovery operations from Production Area #2 commenced in March of 2017. 

Nichols Ranch Plant 

In 2014, construction of the Nichols Ranch Plant was completed. The Nichols Ranch Plant is licensed to produce up to two million 
pounds of uranium per year through three major processing solution circuits: (i) a recovery and extraction circuit; (ii) an elution circuit; 
and (iii) a yellowcake production circuit. The Nichols Ranch Plant is currently constructed and operated with the recovery and extraction 
circuit and the elution circuit installed. We retain the ability to construct and operate a yellowcake drying and packaging circuit at the 
Nichols Ranch Plant at a later date if desired. 

The Nichols Ranch Plant is currently engaged in uranium recovery operations and is processing uranium-bearing wellfield solutions 
from Production Areas #1 and #2 of the Nichols Ranch Wellfield. At the current time, yellowcake production is occurring at the White 
Mesa Mill, whereby yellowcake slurry is shipped by truck from the Nichols Ranch Project to the Mill where it is dried and packaged 
in drums as uranium concentrate product. Prior to the completion of the elution circuit in February 2016, loaded resin was transported 
by truck to a third party facility for elution, drying and packaging, under a toll processing arrangement. 

The Nichols Ranch Plant was acquired by the Company on June 18, 2015, through the acquisition of Uranerz. As of December 31, 
2017, the total cost attributable to the Nichols Ranch Plant on the Company’s financial statements was $29.21 million. 

The Company’s Planned Work 

Header House #9 was completed and uranium extraction began in March 2017. The addition of this header house brought another 123 
extraction and injection wells online. 

As a result of our recent NRC and WEQ license and permit amendment approvals, we are now able to expand extraction operations 
to the Jane Dough Property before expanding to the Hank Project. 

The Hank Project, including the permitted but not constructed Hank Satellite Plant and planned Hank wellfield, is currently licensed 
as a satellite uranium extraction and recovery facility, with loaded resin from the satellite facility, when constructed, expected to be 
transported by truck to the Nichols Ranch Plant for elution. Construction activities at the Hank Project will not commence until market 
conditions warrant. In the future, we will consider whether to amend our current license for the Hank Project to include a pipeline to 
our Nichols Ranch Plant, which would replace or eliminate the currently permitted satellite ion exchange recovery facility. If market 
conditions warrant construction activities at the Hank Project, our extraction plan for the Hank Property will likewise target two planned 
extraction  areas.  Should  market  conditions  warrant,  the  Jane  Dough  and  Hank  Properties  would  be  expected  to  follow  a  similar 
construction, extraction, and restoration schedule as outlined above for the Nichols Ranch Wellfield extraction areas. 

53 

 
 
 
 
 
 
 
 
 
 
The Alta Mesa Project 

Unless stated otherwise, the following description of the Alta Mesa Project is derived from a technical report titled, “Alta Mesa Uranium 
Project, Alta Mesa and Mesteña Grande Mineral Resources and Exploration Target, Technical Report National Instrument 43-101” 
dated July 19, 2016, prepared by Mr. Douglas Beahm, P.E., P.G. of BRS Inc. in accordance with NI 43-101 (the “Alta Mesa Technical 
Report”). The author is a “qualified person” within the meaning of NI 43-101, and because the sole author is “independent” of the 
Company within the meaning of NI 43-101 the report is therefore considered an independent technical report under NI 43-101. The 
Alta Mesa Technical Report is available on SEDAR at www.sedar.com. The Alta Mesa Project does not have any known reserves, and 
is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature, despite its history of uranium recovery 
activities. No current preliminary economic assessment, pre-feasibility study or feasibility study has been completed. 

54 

 
 
 
 
Property Description and Location 

The Alta Mesa Project is a fully-licensed ISR uranium recovery facility that the Company acquired in June 2016 through the acquisition 
of EFR Alta Mesa LLC (previously named Mesteña Uranium LLC). It is located in South Texas and is currently on standby. The Alta 
Mesa Project is not an underground or open pit project. 

The Alta Mesa central processing facility and mine office is located at 755 CR 315, Encino, Texas 78353, in Brooks County, Texas, at 
approximately 26° 54’ 08” North Longitude and 98° 18’ 54” West Latitude. The site is located approximately 11 miles west of the 
intersection of US 281 and Ranch Road 755, which is 22 miles south of Falfurrias, Texas. 

The  Project  is  located  within  a  portion  of  the  private  land  holdings  of  the  Jones  Ranch,  founded  in  1897. The  ranch  comprises 
approximately 380,000 acres. The ranch holdings include surface and mineral rights including oil and gas and other minerals including 
uranium. Active uses of the lands in addition to uranium exploration and production activities include agricultural use (cattle), oil and 
gas development, and private hunting. 

The Project consists of Uranium Mining Leases for uranium ISR mining (4,598 acres) and Mineral Options (195,501 acres) comprising 
some 200,100 total acres.  The Project is defined as constituting two distinct project areas with sufficient drilling to define resources. 
These two areas are subdivided, as listed below and illustrated on the map on the following page: 

•  The Alta Mesa project area, Brooks County, Texas, comprising 16,010 acres, including, 

The Alta Mesa mine area and central processing facility 
South Alta Mesa 
Indigo Snake 

•  The Mesteña Grande project area, Jim Hogg County, Texas, comprising 47,088 acres, including, 

Mesteña Grande Goliad 
Mesteña Grande North 
Mesteña Grande Central 
Mesteña Grande Alta Vista 
El Sordo 

The remaining 137,002 acres lack sufficient exploration drilling to define any resources at this time. 

Accessibility, Local Resources, Physiography and Infrastructure 

The Project is located primarily in Brooks and Jim Hogg counties, Texas, with the central processing facility in Brooks County. Brooks 
County is generally rural and according to the 2010 United States Census, there were 7,223 people living in the county. The population 
density was 8 people per square mile. Most of the workers for the operation are from the local area and nearby communities such as 
Kingsville, Texas approximately 40 miles from the site.  Some staff members commute from Corpus Christi, Texas approximately 90 
miles from the site. 

The Project is located in the coastal plain of the Gulf of Mexico. Topography of the lower Gulf Coast is relatively flat, whereas the 
upper Gulf Coast, including most of the current and past mining operations of the South Texas Uranium Province, generally has low 
relief, rolling plains, except where it is locally dissected by rivers and streams. Elevations range from sea level to about 800 ft. in the 
southwest. Three major rivers from south to north are: the Nueces River, which flows into Corpus Christi Bay, and the San Antonio 
and Guadalupe Rivers, which flow into San Antonio Bay southeast of the city of Victoria. 

The Project is accessible year round. The site is located approximately 11 miles west of the intersection of US Highway 281 (paved) 
and Ranch Road 755 (paved), 22 miles south of Falfurrias, Texas. Commercial airlines serve both San Antonio and Corpus Christi. 
Many of the local communities have small airfields and there are numerous private airfields in the region. 

Overall the climate is warm and dry, with hot summers and relatively mild winters. However, the region is strongly influenced by its 
proximity to the Gulf of Mexico and, as a result, has a much more marine-type climate than the rest of Texas, which is more typically 
continental. Monthly  mean temperatures in the region range from 55oF in January to 96oF in August. The area rarely experiences 
freezing conditions and, as a result, the majority of the processing facility and infrastructure is located outdoors. Wellfield piping and 
distribution lines do not require burial for frost protection. Annual precipitation ranges from 20 to 35 inches regionally. Primary risk 
for severe weather is related to heavy thunderstorms and potentially effects of hurricanes in the Gulf Coast. 

55 

 
 
 
 
 
 
 
 
 
 
 
 
 
Local infrastructure includes electricity service, which is adequate for mine and mineral processing activities. The Alta Mesa facility 
also has telephone and internet service in the form of a T-1 fiber optics line. The plant has an automated control and monitoring system, 
which allows remote monitoring of the facility, and includes fail safe systems, which can shut down portions of the system in the event 
of an upset condition. The facility is fully secured with on-site and remote monitoring. Water supply for the Project is from established 
and permitted local  wells. Liquid  waste from the processing  facility is disposed  of  via  deep well injection through two permitted 
Underground Injection Control (UIC) Class I disposal wells. Solid waste from the processing facilities is disposed of off-site at licensed 
disposal facilities. No tailings or other related waste disposal facilities are needed. 

The Project is located on an operating cattle ranch. In addition, there is significant local oil and gas development and production. The 
Alta Mesa area was first developed as an oilfield in the 1930s with production ongoing, primarily for natural gas. Other land uses 
include farming and recreational uses such as hunting. 

56 

 
 
- 1 

'' 
'' 
'''
''' 
'' 
'' 
' 

,_  ) 

-·___ _ 

]____ ____ ____ ___ 

BROOKS CO. 

_ll!U..S co. 
....!. 
'"',,, 

', 

'--7'

......---------' 

.............---'"'.... 

..........  ......._   ,' 

-------- MESTENA GRANDE 

1 ----------- i 

ALTA VISTA 

I.:. 
""'>------ 

'' 
'' 
'' 
'' 
'
' 
''' 
'' 
'' 
'' 
''' 
)'' 
' 

,/ 
f 

I' 

:/ 
: 
( 

INDIGO SNAKE 

SEE FIGURE 
14.1 FOR 

----------i AREA  NAMES

IN THIS AREA 

--- 
!,TO INTERSTATE 69C 

---... 

_ 

.................., 

Sl  H 

MESA 

/,.,---- 

,        ...... 

I 

/ ,/ 

-(, ,, 

_  _  _  _  _  _  _  _J _!lG 

O:..j _ 

BROOKS CO. 
STARR cO: 7 HIDALGO co:- 

_  _  _  _  _ 

', 

/ /  •••-------· 

I 

',·•••,,,\ 

17.. '---------- 

I/ 

--------.....  ...........-----------------------------------,,,,-,'-,' ,7 

·-·-:,,':, 

/  Ill  I 

LEGEND 

PROPERTY  BOUNDARY 

COUNTY  LINE 

EXISTING    ROAD 

AREA    BOUNDARY 

  eF 

PREPARED  FOR 

ENERGY  FUELS  INC, 

PREPARED  BY 

BR 5  INCORPORATED 
1130 Major  A      u•, Rl...rton,  WY    82501 

ALTA  MESA  URANIUM  PROJECT 
BROOKS  AND   JIM   HOGG   COUNTIES,  TEXAS,  USA 

llESTERA  GRANDE  PROJECT  AREA    ---- 

0 
" -JSJlS' l\'£RTY KAP, BROOKS AND  llll HOGG COUNTIES 

GRAPHIC SCALE 

ALTA   llESA   PROJECT   AREA 

1 

"ti' ::::11c :  • :::J•  • l i '=:::j1' 
I  Inch  =  4  miles 

DRA'llllN BY:  COS 

RE\1SION  NO.       DATE 

BY 

DATE: 

5/20/14 

QtECKED BY:DlB 

LAST  PLOT  DATE:  5/23/1 

DRAWING  SCALE: 
1"•4 Mll£S 

flGURE: 

4.1 

57 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
The area is regionally classified as a coastal sand plain. Brooks County comprises 942 square miles of brushy mesquite land. The nearly 
level to undulating soils are poorly drained, dark and loamy or sandy; isolated dunes are found. In the northeast corner of the county 
the soils are light-colored and loamy at the surface and clayey beneath. 

The mineral leases and options described below include provisions for reasonable use of the land surface for the purposes of ISR mining 
and mineral processing. Alta Mesa is a fully licensed, operable facility with sufficient sources of power, water, and waste disposal 
facilities for operations and aquifer restoration. While the current staff level has been reduced, sufficient local personnel are available 
for mine operations. 

Ownership 

Mineral ownership in Texas is a private estate. Private title to all land in Texas emanates from a grant by the sovereign of the soil 
(successively, Spain, Mexico, the Republic of Texas, and the state of Texas). By a provision of the Texas Constitution the state released 
to the owner of the soil all mines and mineral substances therein. Under the Relinquishment Act of 1919, as subsequently amended, 
the surface owner is made the agent of the state for the leasing of such lands, and both the surface owner and the state receive a fractional 
interest in the proceeds of the leasing and production of minerals. 

The Project consists of a private Uranium Solution Mining Lease (4,598 acres) and Options (195,501 acres) for uranium comprising 
some 200,100 total acres consisting of acreage associated with currently approved mining permits issued by the Texas Commission 
on Environmental Quality and 9 prospect areas. 

The Uranium Solution Mining Lease, originally dated June 1, 2004, covers 4,575 acres, more or less, out of the “La Mesteñas” Ysidro 
Garcia Survey, A-218, Brooks County, Texas and “Las Mesteñas Y Gonzalena” Rafael Garcia Salinas Survey, A-480, Brooks County, 
Texas (description corrected in a later amendment). This original Uranium Solution Mining Lease has been superseded by the Amended 
and Restated Uranium Solution Mining Lease dated June 16, 2016, as part of the share purchase agreement between the Company and 
the various former holders of the Alta Mesa Project. The Lease now covers uranium, thorium, vanadium, molybdenum, other fissionable 
minerals, and associated minerals and materials under 4,597.67 acres. The term of the amended lease is fifteen (15) years commencing 
on  June  16,  2016  or  so  long  as  the  lessee is  continuously  engaged in  any  mining,  development,  production,  processing,  treating, 
restoration or reclamation operations on the leased premises. The amended lease can be extended by the Lessee for an additional 15 
years upon payment of a stipulated cash payment. The lease includes provisions for royalty payments on the net proceeds (less allowable 
deductions) received by the Lessee. The royalty payment is 7.5% of Market Value of Product sold at a uranium price greater than 
$95.00 per pound, 6.25% of Market Value of Product sold at a uranium price greater than $65.00 and up to and including $95.00 per 
pound, and 3.125% of the Market Value of Product sold at a uranium price of $65.00 or less per pound. 

The Uranium Testing Permit and Lease Option Agreement, originally dated August 1, 2006, covers all of the land containing mineral 
potential as identified through exploration efforts and covers uranium, thorium,  vanadium, molybdenum, and all other fissionable 
materials, compounds, solutions, mixtures, and source materials, has been superseded by the Amended and Restated Uranium Testing 
and Lease Option Agreement dated June 16, 2016, as part of the share purchase agreement between the Company and the various 
holders of the Alta Mesa Project. It now covers some 195,501.03 acres. The term of the amended lease and option agreement is for 
eight years commencing June 16, 2016. The amended lease and option agreement can be extended by the grantee for an additional 
seven years. Certain payments by the Grantee to the Grantor are required prior to year three of the initial eight year lease. The amended 
Lease Option Agreement provides for designating acreage to be leased for production by making certain payments to the Grantor (cash 
or stock). If acreage designation occurs within the first three years of the initial eight year lease, the payments will be deducted from 
the certain payments required by year three in the lease option agreement. The grantor then has sixty business days to execute and 
return the lease. 

Amended surface use agreements have been entered into with all of the surface owners on the various prospect areas as part of the 
Membership Interest purchase agreement between the Company and the various former holders of the Alta Mesa Project. These amended 
agreements, unchanged from those originally entered into on June 1, 2004, provide, among other things, for stipulated damages to be 
paid for certain activities related to the exploration and production of Uranium. Specifically, the agreements call for Consumer Price 
Index adjusted payments for the following disturbances:  exploratory test holes, development test holes, monitor wells, new roads, and 
related surface disturbances. The lease also outlines an annual payment schedule for land taken out of agricultural use around the area 
of a deep disposal well, land otherwise taken out of agricultural use, and pipelines constructed outside of the production area. 

Surface rights are expressly stated in the lease and in general provide the lessee with the right to ingress and egress, and the right to 
use so much of the surface and subsurface of the leased premises as reasonably necessary for ISR mining. Open pit and/or strip mining 
is prohibited by the lease. 

58 

 
 
 
 
 
 
 
 
 
Ad valorem tax rates per $100 of taxable value applicable to tangible property for 2016 were as follows: 

Brooks County 
Brooks County Rd and Bridge 
Brooks County ISD 
Brooks County FM FC 
Brush Country Groundwater 

0.743829 
0.150000 
1.572555 
0.098837 
0.026020 

Permitting and Licensing 

The Alta Mesa Project area is fully permitted for ISR mining and recovery of uranium. The table below summarizes the current permits 
held by EFR Alta Mesa. Similar permits would be required for the Mesteña Grande project area depending upon the nature of operations 
and their integration with the Alta Mesa facility. 

Primary Permits and Licenses for the Alta Mesa Project 

Permit, License or Approval Name 

Radioactive Material License 

Class III UIC Mine Area Permit 

Aquifer Exemption 

Production Area Authorization 

Class I UIC Deep Disposal Well Permits 

* TCEQ= Texas Commission on Environmental Quality 

Agency 

TCEQ 

TCEQ 

TCEQ 

TCEQ 

TCEQ 

Status 

Obtained 

Obtained 

Obtained 

Obtained 

Obtained 

The ISR processing facility at Alta Mesa has an operating capacity of 1.5 million pounds of uranium per year. Primary regulatory 
authority resides with the State of Texas. Financial assurance instruments are held by the state for completed wells, ISR mining, and 
uranium processing to ensure reclamation and restoration of the affected lands and aquifers in accordance with state regulations and 
permit requirements. 

History 

Alta Mesa was first discovered in the mid 1970’s by Chevron Resources as a result of researching oil and gas logs for natural gamma 
geophysical signatures. Chevron controlled the Alta Mesa portion of the project through June of 1985 when they returned the mineral 
lease due to Chevron exiting the uranium business. Chevron reportedly drilled a total of 360 holes inclusive of exploration drilling, 
coring, and well completion during a four-year period from 1981 through 1984. In July of 1988 Total Minerals Incorporated (“Total”) 
executed a lease agreement for the Alta Mesa portion of the project.  Total also engaged Uranium Resources Incorporated (“URI”) to 
complete a feasibility study for the project. The Total mineral lease was terminated as a result of the French Government requiring 
Total to sell all of their uranium assets to Cogema. 

Subsequently, the Project was evaluated by Cogema in 1994 and later by URI. URI held the mineral lease and obtained the Radioactive 
Material License during the period of 1996 through 1998. EFR Alta Mesa (previously named "Mesteña Uranium LLC") was formed 
in 1999 and continued permitting activities in April of 2000 and completed licensing in 2003. Plant construction at Alta Mesa began 
in 2004 with initial production in the 4th quarter of 2005. The Project produced approximately 4.6 million pounds of uranium oxide 
between 2005 and 2013 via ISR mining. The facility was in production from 2005 until primary production ceased in February 2013. 
The Project operated in a groundwater clean-up mode until February 2015; therefore, any uranium mined since 2013 remains as in- 
circuit inventory. 

The Alta Mesa Project is located within the Texas Gulf Coast along a belt of Tertiary and Quaternary sedimentary formations. The 
Project is located within the South Texas Uranium Province, which is known to contain more than 100 uranium deposits that were 
developed in the second half of the 20th century. 

Geology 

59 

 
 
 
 
 
 
 
 
 
 
 
 
 
Regionally, uranium deposits are hosted by four formations: 

•  Miocene/Pliocene Goliad Formation, consisting of fluvial deposits, mostly unconsolidated sands. 
•  Miocene Oakville Formation, consisting of fluvial deposits (sands, some clay). 
•  Oligocene/Miocene Catahoula Formation, consisting of fluvial deposits, mostly sands, clay, and clastic volcanic rich sediments. 
•  The Jackson Group consisting of fluvial deposits sands, silt, clay, and lignite. 

At the Alta Mesa Project, in order of importance, uranium is hosted by the Goliad, Oakville, and Catahoula formations. 

South Texas  uranium  deposits  are  sandstone  roll-front  uranium  deposits. The  key  components  in  the  formation  of  roll-front  type 
mineralization include: 

•  A permeable host formation: 

      Sandstone units of the Goliad, Oakville, and Catahoula formations. 

•  A source of soluble uranium: 

      Volcanic ash-fall tuffs coincidental with Catahoula deposition containing elevated concentration of uranium is the 

probable source of uranium deposits for the South Texas Uranium Province. 

•  Oxidizing ground waters to leach and transport the uranium: 

      Ground waters regionally tend to be oxidizing and slightly alkaline. 

•  Adequate reductant within the host formation: 

      Conditions resulting from periodic H2S gas migrating along faults and subsequent iron sulfide (pyrite) precipitation 

created local reducing conditions. 

•  Time sufficient to concentrate the uranium at the oxidation/reduction interface. 

      Uranium precipitates from solution at the oxidation/reduction boundary (REDOX) as uraninite which is dominant 

(UO2, uranium oxide) or coffinite (USiO4, uranium silicate). 

      The geohydrologic regime of the region has been stable over millions of years with ground water movement controlled 

primarily by high-permeability channels within the predominantly sandstone formations of the Tertiary. 

The structural map of the Gulf Coast area is dominated by an abundance of growth faults that trend with, or are slightly oblique to, 
stratigraphic strike, which is more or less parallel to the Gulf of Mexico. In addition, local structural features such as salt domes influence 
the distribution and deposition of uranium mineralization potentially through various mechanisms including effects on ground water 
flow and the introduction of additional reductant via the migration of H2S gas along the faulting related to the salt dome intrusion. This 
mechanism is thought to be of importance at Alta Mesa. 

Mineralization 

The Alta Mesa Project is located in the South Texas Uranium Province. Mineralization within the South Texas Uranium Province is 
interpreted to be dominantly roll-front type mineralization and primarily of epigenetic origin. Roll-fronts are formed along an interface 
between oxidizing ground water solutions, which encounter reducing conditions within the host sandstone unit. This boundary between 
oxidizing and reducing conditions is often referred to as the REDOX interface or front. Mineralization tends to be very continuous. 

Within the Alta Mesa portion of the Project, Quaternary formations are exposed at the surface. These are conformably underlain by 
the Goliad Formation, the primary uranium host. Alta Mesa ISR mine units have exploited uranium mineralization in the Goliad C 
sands within wellfields PAA-1, PAA-2, PAA-3, PAA-4, and PAA-6. The B sand was targeted in wellfield PAA-5. Mineral resources 
have been estimated for the A, B, C, and D sands. Exploration targets in the South Alta Mesa area lie within successively deeper D, E, 
F, G, and H sands of the Goliad. 

Within the Mesteña Grande portion of the project, mineralization is also present in the Goliad Formation but is dominantly found in 
the Oakville Formation. In the western portion of Mesteña Grande mineralization is found in the Catahoula Formation. Mineral resources 
have been estimated for all areas within the Mesteña Grande portion of the project. 

Present Condition of the Property and Work Completed to Date 

The Alta Mesa Project produced approximately 4.6 million pounds of uranium oxide between 2005 and 2013 via In Situ Recovery 
mining.  The  facility  was  in  production  from  2005  until  primary  production  ceased  in  February  2013.  The  Project  operated  in  a 
groundwater clean-up mode until February 2015; therefore, any uranium mined since 2013 remains as in-circuit inventory.  The first 
wellfield (PAA-1) has undergone restoration and is currently being monitored for restoration stability. All other wellfields are being 
maintained by a small bleed (less than 100 gpm) for permit compliance. The bleed solutions are disposed of in the deep disposal wells. 

Drill data is available for a total of 10,744 drill holes of which approximately 3,000 are within existing wellfields. The primary assay 
data for the Project is downhole geophysical log data. EFR Alta Mesa relied entirely on prompt-fission-neutron ("PFN") logging for 

60 

 
 
 
 
 
 
 
 
 
 
 
uranium grade assay and used natural gamma logging to screen intervals for PFN logging. Of the 10,744 drill holes in the Alta Mesa 
database, PFN logging was not available for only 7.2% of the drill holes. For the Mesteña Grande portion of the Project, all 460 drill 
holes were completed by EFR Alta Mesa and all gamma intercepts greater than 0.02 % eU3O8 were logged by PFN. 

For determination of uranium grade, EFR Alta Mesa LLC relied on PFN log data for 92.8% of the data, which is a direct measurement 
of uranium content and not an equivalent radiometric assay. As a result, assessment of disequilibrium factor ("DEF") is not applicable. 

As of December 31, 2017, the total cost attributable to the Alta Mesa Project on the Company's financial statements was $13.63 million. 

The Company’s Planned Work 

During 2018, the Company expects to maintain the Alta Mesa Project on standby. However, Alta Mesa is capable of ramping up to 
commercial production levels within approximately six months of a positive production decision by the Company, with only minimal 
capital requirements. 

Mineral Resource Estimates 

Mineral resources have been estimated for both the Alta Mesa and Mesteña Grande areas by Douglas Beahm of BRS Inc. in accordance 
with CIM standards and definitions, and are summarized in the respective tables below. Mineral Resources for the Alta Mesa Project 
are estimated by classifications, meeting CIM standards and definitions as measured, indicated, and inferred mineral resources, at a 
1.30 GT cutoff. 

There are no Mineral Reserves on the property at this time. Mr. Beahm of BRS Inc. noted that he is not aware of any known environmental, 
permitting, legal, title, taxation, socioeconomic, marketing, political, or other relevant factors that could materially affect the current 
resource estimate. 

Alta Mesa and Mesteña Grande Resource Summary 

Alta Mesa and Mesteña Grande Mineral Resources – Uranium(1)(2)(3)(4)

Classification 

Total Measured Resources (M)(5)

Alta Mesa Indicated Resources (I) 

Mesteña Grande Indicated Resources (I) 

Total (M & I) 

Alta Mesa Inferred Resources 

Mesteña Grande Inferred Resources 

Total Inferred Resources 

Notes: 

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

123 

0.151% 

1,393 

0.106% 

119 

0.120% 

1,635 

0.111% 

1,230 

0.128% 

371 

2,959 

287 

3,617 

3,192 

5733 

0.119% 

13,601 

6,963 

0.121% 

16,793 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.30 G.T. (minimum 0.02% eU3O8). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound. 
(4)  Numbers may not add due to rounding. 
(5)  The Total Measured Mineral Resource is that portion of the in-place mineral resource that is estimated to be recoverable within 
existing wellfields. Wellfield recovery factors have not been applied to indicated and inferred mineral resources. 

61 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The White Mesa Mill 

General 

The White Mesa Mill is a fully licensed uranium and vanadium processing facility located in southeastern Utah, approximately six 
miles south of the city of Blanding, Utah. It is within trucking distance of our conventional properties in Utah, Colorado, Arizona and 
New Mexico, including the Canyon Project, the Roca Honda Project, the Henry Mountains Complex, the La Sal Project and the Daneros 
Project. The Mill is the only fully operational and licensed conventional uranium mill in the U.S. It is capable of functioning independently 
of off-site support except for commercial power from Rocky Mountain Power and as-needed supplemental water supply from the City 
of Blanding, Utah, and the San Juan Water Conservancy District. The White Mesa Mill is a uranium processing and recovery facility. 
It is not an underground or open pit project. 

The Mill is licensed to process an average of 2,000 tons of ore per day and to extract over 8.0 million pounds of U3O8 per year. In 
addition to the conventional circuit, the Mill has a separate vanadium by-product recovery circuit. 

In addition to the Mill processing equipment, which includes the grinding and leaching circuits, CCD (liquid–solid separation), solvent 
extraction, and precipitation and drying circuits, the Mill has several days of reagent storage for sulfuric acid, ammonia, salt, soda ash, 
caustic soda, ammonium sulfate, flocculants, kerosene, amines, and liquefied natural gas. 

The on-site infrastructure also includes a stockpile area capable of storing up to 450,000 tons of mineralized material, and existing 
tailings capacity of approximately 3.5 million tons of solids. In addition, the Mill has approximately 90 acres of evaporation capacity. 

Synthetic lined cells are used to contain tailings and solutions for evaporation. We operate two tailings cells and one or more evaporation 
ponds during normal operations. As each tailings cell is filled, the water is drawn off and pumped to an evaporation pond and the 

62 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
tailings solids are allowed to dry. As each tailings cell reaches final capacity, reclamation begins with the placement of interim cover 
over the tailings. Additional cells are excavated, and the overburden is used to reclaim previous cells. In this way, there is an ongoing 
reclamation process. 

In full operation, the Mill employs approximately 150 people. If no Vanadium ores are being processed, the Mill employs approximately 
110 people. 

Alternate Feed Materials 

The Mill License (defined below) also gives the Company the right to process other uranium-bearing materials known as “alternate 
feed materials” pursuant to an Alternate Feed Guidance published by the NRC. Alternate feed materials are uranium-bearing materials, 
usually classified as waste products by the generators of the materials, which can be recycled by the Mill for the recovery of U3O8. 
The Mill License does not permit the processing of uranium-bearing materials that have undergone enrichment. Requiring a routine 
amendment to the Mill License for each different alternate feed material, the Company can process these uranium-bearing materials 
and recover uranium, in some cases, at a fraction of the cost of processing conventionally mined material. In other cases, the generators 
of the alternate feed materials are willing to pay a recycling fee to the Company to process these materials to recover uranium and then 
dispose of the remaining by-product in the Mill’s licensed tailings cells, rather than directly disposing of the materials at a disposal 
site. By working with the Company and taking the recycling approach, the suppliers of alternate feed materials can significantly reduce 
their remediation costs, as there are only a limited number of disposal sites for such materials in the United States. Alternate feed 
materials are particularly attractive to Energy Fuels because they carry no associated mining costs. 

Throughout its history, the Mill has received 17 license amendments, authorizing it to process 20 different alternate feed materials. Of 
these amendments, eleven have involved the processing of feeds provided by nuclear fuel cycle facilities and private industry, and one 
has involved the processing of material from the United States Department of Energy (“DOE”). These twelve feed materials have been 
relatively high in uranium content and relatively low in volume. The remaining five amendments have allowed the Mill to process 
uranium-bearing soils from former defense sites, known as FUSRAP sites, which were being remediated by the U.S. Army Corps of 
Engineers. These materials are typically relatively low in uranium content but relatively high in volume. 

The Mill has a separate circuit for processing certain types of alternate feed materials, which was built in 2009. This circuit enables 
the Mill to process both conventionally mined material and alternate feed materials simultaneously. 

Accessibility, Local Resources, Physiography and Infrastructure 

The Mill is located in central San Juan County, Utah, approximately six miles (9.5 km) south of the city of Blanding. It can be reached 
by taking a private road for approximately 0.5 miles west of U.S. Highway 191. 

The climate of southeastern Utah is classified as dry to arid continental. Although varying somewhat with elevation and terrain, the 
climate in the vicinity of the Mill can be considered as semi-arid with normal annual precipitation of about 13.4 inches. The weather 
in the Blanding area is typified by warm summers and cold winters. The mean annual temperature in Blanding is about 50° (F). Winds 
are usually light to moderate in the area during all seasons, although occasional stronger winds may occur in the late winter and spring. 

The Mill site is located on a gently sloping mesa that, from the air, appears similar to a peninsula, as it is surrounded by steep canyons 
and washes and is connected to the Abajo Mountains to the north by a narrow neck of land. On the mesa, the topography is relatively 
flat, sloping at less than one (1) percent to the south and nearly horizontal from east to west. 

The  natural  vegetation  presently  occurring  within  a  25-mile  (40-km)  radius  of  the  Mill  site  is  very  similar  to  that  of  the  region, 
characterized by pinyon-juniper woodland integrating with big sagebrush (Artemisia tridentata) communities. 

Off-site infrastructure includes paved highway access from U.S. Highway 191, and rights-of-way for commercial power and a water 
supply pipeline from Recapture Reservoir, which brings up to 1,000 acre-feet of water per year to the Mill site. The Mill also has four 
deep (2,000+ foot) water supply wells, which are available to supply process water during normal operations. 

The White Mesa Mill is located on 4,816 acres of private land owned in fee by Energy Fuels. This land is located in Township 37S 
and 38S Range 22E Salt Lake Principal Meridian. Energy Fuels also holds 253 acres of mill site claims and a 320 acre Utah state lease. 
No facilities are planned on the mill site claims or leased land, which are used as a buffer to the operations. 

Ownership 

63 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
All operations authorized by the Mill’s License are conducted within the confines of the existing site boundary. The milling facility 
currently occupies approximately 50 acres and the current tailings disposal cells encompass another 250 acres. 

Permitting and Licensing 

The White Mesa Mill holds a Radioactive Materials License through the State of Utah (the “Mill License”). Uranium milling in the 
U.S. is primarily regulated by the NRC pursuant to the Atomic Energy Act of 1954, as amended. The NRC’s primary function is to 
ensure the protection of employees, the public and the environment from radioactive materials, and it also regulates most aspects of 
the uranium recovery process. The NRC regulations pertaining to uranium recovery facilities are codified in Title 10 of the Code of 
Federal Regulations. These regulations also apply to our ISR facilities in Wyoming and Texas. 

On August 16, 2004, the State of Utah became an Agreement State for the regulation of uranium mills. This means that the primary 
regulator for the White Mesa Mill is UDEQ rather than the NRC. At that time, the Source Material License, which was previously 
issued and regulated by the NRC, was transferred to the State and became a Radioactive Materials License. The State of Utah incorporates, 
through its own regulations or by reference, all aspects of Title 10 pertaining to uranium recovery facilities. The Mill License was due 
for renewal on March 31, 2007. Energy Fuels’ predecessor timely submitted its application for renewal of the license on February 28, 
2007. The renewed license was issued by UDEQ on January 19, 2018 for a period of ten years, after which another application for 
renewal will need to be submitted. During the review period for each application for renewal, the Mill can continue to operate under 
its then existing license until such time as the renewed license is issued. The Mill’s license was initially issued in 1980 and was also 
renewed in 1987 and 1997. 

When the State of Utah became an Agreement State, it required that a Groundwater Discharge Permit (“GWDP”) be put in place for 
the White Mesa  Mill. The GWDP is required for all similar facilities in the State of Utah, and implements the State groundwater 
regulations to the Mill site. The State of Utah requires that every operating uranium mill have a GWDP, regardless of whether or not 
the facility discharges to groundwater. The GWDP for the Mill was finalized and implemented in March 2005. The GWDP required 
that the Mill add over 40 additional monitoring parameters and 15 additional monitoring wells at the site. The GWDP came up for 
renewal in 2010, at which time an application for renewal was timely submitted. The renewed GWDP was issued by UDEQ on January 
19, 2018 for a period of five years, after which another application for renewal will need to be submitted. During the review period for 
each application for renewal, the Mill can continue to operate under its then existing GWDP until such time as the renewed GWDP is 
issued. The White Mesa Mill also maintains a permit for air emissions with the UDEQ, Division of Air Quality. 

The White Mesa Mill is subject to decommissioning liabilities. Energy Fuels, as part of the Mill License, is required to annually review 
its estimate for the decommissioning of the White Mesa Mill site and submit it to UDEQ for approval. The estimate of closure costs 
for the Mill is $20.8 million as of December 31, 2017, and financial assurances are in place for the total amount. However, there can 
be no assurance that the ultimate cost of such reclamation obligations will not exceed the estimated liability contained in the Company’s 
financial statements. 

History 

The Mill was originally constructed and owned by Energy Fuels Nuclear, Inc. (“EFN”) and its affiliates (no relation to the Company). 
It was licensed by the NRC and commenced operations in June 1980. In 1984, EFN transferred a 70% interest in the Mill to UMETCO 
Minerals Corp., a subsidiary of Union Carbide Corporation (“UMETCO”). UMETCO became the operator of the Mill in 1984 and 
continued to be the operator until 1994, at which time it transferred its interest in the Mill back to EFN and its affiliates. The Mill was 
acquired by Denison Mines Corp. (“Denison”), then named International Uranium Corporation (“IUC”) and its affiliates in 1997, and 
was operated by Denison until it  was acquired by the  Company  in June 2012. From the  original commissioning in 1980  through 
December 31, 2017, the Mill has recovered a total of approximately 38 million pounds of U3O8 and 46 million pounds of vanadium. 

In late 2006, Denison began a program to refurbish the Mill. The refurbishment program included the purchase of mobile equipment, 
restoration of the vanadium roasting, fusion and packaging circuits, replacement of major pumps and component drives, modernization 
of the Mill’s instrumentation and process control systems, and completion of relining tailings Cell 4A. The total cost of the refurbishment 
program was approximately $31.0 million and was completed in 2008. 

The White Mesa Mill has historically operated on a campaign basis. In 2008, the Mill began processing uranium/vanadium conventional 
mined material, extracting uranium concentrate in the form of U3O8, and vanadium in the form of V2O5. Mineral processing continued 
through the end of March 2009, at which time maintenance activities were performed at the Mill. Mineral processing recommenced 
near the end of April 2009, but was discontinued due to a decline in uranium prices at the time. The Mill began mineral processing 
again in March 2010 and continued through June 2011. Conventional processing recommenced in November 2011 and continued until 
early March 2012, at which time it ceased for routine maintenance. Conventional mineral processing recommenced at the Mill in 
August 2012 and continued until early June 2013. Mineral processing began again in May 2014 and continued through August 2014. 

64 

 
 
 
 
 
 
 
 
 
 
The alternate feed circuit processed materials from January through December 2014, and continued processing alternate feed materials 
through December 2015. In 2016, the Company continued processing several alternate feed materials and processed 45,057 tons of 
mineralized material from its Pinenut mine. In 2017 the Mill continued processing alternate feed materials as well as the recovery of 
uranium from pond solutions at the site. 

Energy Fuels acquired the Mill from Denison Mines Corp. on June 29, 2012. All mineral processing after that date has been for the 
account of Energy Fuels. Mineral processing at the Mill over the past five years is shown below. Note, only mineral processing since 
June 30, 2012 has been for the account of Energy Fuels.(1)

Project or Source 

2017 

2016 

2015 

2014 

2013 

Alternate Feed Materials(2)

Tons (000)  NA(2) 

NA(2) 

NA(2) 

NA(2) 

NA(2) 

Ave. % U3O8 

18.86% 

27.98 

9.21 

16.94% 

5.03% 

Recovered Pounds U3O8 (000)  1,004(3)(4) 

172(3)(4) 

229(3) 

391(3) 

351(3) 

Tailing Solution Recycle & In-Circuit Material(5)

Conventional Feed Materials 

Recovered Pounds U3O8 (000) 

308 

78 

67 

--- 

--- 

Tons (000) 

Contained Grade % U3O8 

Recovered Pounds U3O8 (000) 

Total Pounds of U3O8 Recovered (000) 

Total Pounds of V2O5 Recovered (000) 

Notes: 

--- 

--- 

--- 

1,312 

45 

0.50% 

431 

681 

--- 

--- 

--- 

296 

49 

126 

0.56% 

0.26% 

552 

943 

655 

1,006 

1,303 

(1)  Mineralized material is shown as being processed and pounds recovered during the year in which the materials were processed 
at the White Mesa Mill, which is not necessarily the year in which the materials were extracted from the project facilities. 
(2)  All  alternate  feed  materials  were  processed  at  the White  Mesa  Mill. A number  of  different  alternate  feed  materials  were 
processed during the period 2013 - 2017. The table shows the average uranium grades and the total pounds recovered from all 
alternate feed materials processed at the Mill during each of the years in that period. Because of the variability in uranium grades, 
pounds recovered is considered to be the relevant metric and tons fed is not considered to be relevant. 
(3)  The 1,004,000 pounds recovered in 2017 include 952,000 pounds recovered for the accounts of third parties; the 172,000 
pounds recovered in 2016 includes nil pounds recovered for the accounts of third parties; the 229,000 pounds recovered in 2015 
includes 72,000 pounds recovered for the accounts of third parties; the 391,000 pounds recovered in 2014 includes 85,000 pounds 
recovered for the accounts of third parties; and the 351,000 pounds recovered in 2013 includes nil pounds recovered for the accounts 
of third parties. 
(4)  Material recovered originated from several different sources that  were  fed to process at  various times  in 2015  and 2016. 
Therefore, the recovered amount is independent of the reported feed amount for any given period. 
(5)  Pounds contained in tailings solutions containing previously unrecovered uranium, together with in-circuit mineralized material 
from previous conventional mine material processing, were recovered by processing alternate feed materials at the White Mesa 
Mill, though tons and grade are not available because it cannot be tied to any specific source. 

Planned Operations and Maintenance 

Present Condition of the Property 

The White Mesa Mill processed conventional material from June to mid-August 2014. The alternate feed circuit was operating throughout 
2014 and 2015, and stopped processing materials in July of 2016. The White Mesa Mill processed conventional mineralized material 
in the second and third quarter of 2016 and processed alternate feed materials during the remainder of the year. In 2017, the Mill 

65 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
processed only alternate feed materials and recovered uranium from pond solutions at the site. The Mill operations registered zero lost 
time accidents in 2017. 

Environmental Matters 

Prior to Energy Fuels’acquisition of the Mill from Denison, chloroform in the shallow aquifer at the White Mesa Mill site was discovered. 
The chloroform appears to have resulted from the operation of a temporary laboratory facility that was located at the site prior to and 
during the construction of the Mill, and from septic drain fields that were used for laboratory and sanitary wastes prior to construction 
of the Mill’s tailings cells. In April 2003, Denison commenced an interim remedial program of pumping the chloroform affected water 
from the groundwater to the Mill’s tailings system. This action enabled Energy Fuels to begin cleanup of the affected areas and to take 
a further step towards resolution of this outstanding issue. Pumping from the wells continued in 2015. On September 14, 2015, the 
State of Utah approved a long-term Corrective Action Plan (“CAP”) for cleanup of the chloroform, which involves continued pumping 
of the affected water to the Mill’s tailings system. While the investigations to date indicate that this chloroform appears to be contained 
in a manageable area, the scope and costs of final remediation have not yet been determined and could be significant. 

Prior to Energy Fuels’ acquisition of the Mill from Denison, elevated concentrations of nitrate and chloride were observed in some of 
the monitoring wells at the White Mesa Mill site in 2008, a number of which are upgradient of the Mill’s tailings cells. Pursuant to a 
Stipulated  Consent  Agreement  with  UDEQ,  Denison  retained  INTERA,  Inc.,  an  independent  professional  engineering  firm,  to 
investigate these elevated concentrations and to prepare a Contamination Investigation Report for submittal to UDEQ. The investigation 
was completed in 2009, and the Contamination Investigation Report was submitted to UDEQ in January 2010. INTERA concluded in 
the Report that: (1) the nitrate and chloride are co-extensive and appear to originally come from the same source; and (2) the source is 
upgradient  of  the  Mill  property  and  is  not  the  result  of  Mill  activities.  UDEQ  reviewed  the  Report,  and  concluded  that  further 
investigations  were  required  before  it  could  determine  the  source  of  the  contamination  and  the  responsibility  for  cleanup.  Such 
investigations were performed in 2010 and 2011, but were considered to be inconclusive by UDEQ. As a result, after the investigations, 
it was determined that there are site conditions that make it difficult to ascertain the source(s) of contamination at the site, and that it 
was not possible at that time to determine the source(s), causes(s), attribution, magnitude(s) of contribution, and proportion(s) of the 
local nitrate and chloride in groundwater. For those reasons, UDEQ decided that it could not eliminate Mill activities as a potential 
cause, either in full or in part, of the contamination. The Company and UDEQ have therefore agreed that resources are better spent in 
developing a CAP, rather than continuing with further investigations as to the source(s) and attribution of the groundwater contamination. 
Pursuant to a revised Stipulated Consent Agreement, Denison submitted a draft CAP for remediation of the contamination to UDEQ 
in November 2011. The CAP proposed a program of pumping the nitrate contaminated groundwater to the Mill’s tailings cells, similar 
to the chloroform remedial program.  UDEQ  approved  the CAP on December 12, 2012. In accordance with the CAP,  in 2013  the 
Company commenced pumping nitrate/chloride contaminated water from four monitoring wells for use in Mill processing or discharge 
into the Mill’s process or tailings cells. Although the contamination appears to be contained in a manageable area, the scope and costs 
of final remediation have not yet been determined and could be significant. 

During 2011, 2012, and 2013, the White Mesa Mill reported consecutive exceedances of groundwater compliance limits (“GWCLs”) 
under the Mill’s GWDP for several constituents in several wells, and there are decreasing trends in pH in a number of wells across the 
site that have caused the pH in a number of compliance monitoring wells to have dropped below their GWCLs. These exceedances 
and pH trends include wells that are up-gradient of the Mill facilities, far down-gradient of the Mill site and at the site itself. These 
consecutive exceedances of GWCLs have resulted in violations of the GWDP. Source Assessment Reports were submitted in 2012 and 
2013 addressing each exceedance and the decreasing trends in pH at the site. UDEQ has accepted the Source Assessment Reports, and 
has concluded that such exceedances and decreasing trends in pH are due to natural background influences at the site. The renewed 
GWDP, issued on January 19, 2018, has revised GWCLs which are intended to account for these background influences and put those 
constituents, including pH at the site, back into compliance. 

Total Cost of Project 

The White Mesa Mill was acquired by the Company in June 2012, through the acquisition of the US Mining Division from Denison. 
The cost of the White Mesa Mill has been fully impaired, and as of December 31, 2017, the total cost attributable to the White Mesa 
Mill and its associated equipment on the financial statements of the Company was nil. 

The Company’s Planned Work 

The Company continues to process alternate feed material at the White Mesa Mill. During 2018 the Mill is expected to continue alternate 
feed processing and the recovery of uranium from uranium dissolved in the Mill's ponds, as well as to pursue additional alternate feed 
materials and other sources of feed for the Mill, as well as evaluate the possibility of recovering vanadium from existing pond solutions 
at the Mill. 

66 

 
 
 
 
 
 
 
 
 
 
The Canyon Mine 

Except as noted, the following technical and scientific description of the Canyon Project is based on a technical report titled “Technical 
Report on the Canyon Mine, Coconino County, Arizona, U.S.A.”, dated October 6, 2017 prepared by Mark B. Mathisen, C.P.G., Valerie 
Wilson, M.Sc., P.Geo, and Jeffrey L. Woods, QP MMSA, SME of RPAin accordance with NI 43-101 (the “Canyon Technical Report”). 
Each of the authors of the Canyon Technical Report is a “qualified person” and is “independent” of the Company within the meaning 
of NI 43-101. The Canyon Technical Report is available on SEDAR at www.sedar.com. The Canyon Project does not have known 
reserves, and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature, despite currently ongoing 
development activities. 

Property Description and Location 

The Canyon Project is a fully constructed and partially developed underground uranium project with: a head frame, a hoist, a compressor 
and a completed shaft. The site is located south of Grand Canyon National Park, in Sections 19 and 20, T29N, R03E, GSRM, Coconino 
County, Arizona, 153 miles north of Phoenix, 86 miles northwest of Flagstaff and seven miles south of Tusayan, Arizona in the Kaibab 
National Forest. The Canyon Project was acquired by Energy Fuels in its June 2012 acquisition of Denison’s US Mining Division. 

The Canyon Project is located in the Arizona Strip mining district. The Arizona Strip is an area largely bounded on the north by the 
Arizona/Utah state line; on the east by the Colorado River and Marble Canyon; on the west by the Grand Wash Cliffs; and on the south 
by a midpoint between the city of Flagstaff and the Grand Canyon. The area encompasses approximately 13,000 square miles. Uranium- 
bearing material from the Arizona Strip mines is hauled by truck to the White Mesa Mill where it is processed. The Company’s Arizona 
1, Pinenut (now in reclamation) and EZ Projects are located north of the Grand Canyon. The Canyon Project and Wate Project are 
located south of the Grand Canyon. The Canyon Project is 325 road miles from the Mill. 

67 

 
 
 
 
 
 
Accessibility, Climate, Local Resources, Infrastructure and Physiography 

Access to the Canyon Mine site is via State Highway 64 and Federal Highway 180 to within five miles of the mine site, then over 
unsurfaced public Forest Service roads.  The Atchison, Topeka and Santa Fe railway line passes east-west 50 mi. south of the site at 
Williams, and a spur of the railway, which passes 10 mi. west of the Canyon Mine site, services the Grand Canyon National Park. 
Airports at Flagstaff, Phoenix, and Tusayan provide air access to the area. 

Climate in northern Arizona is semi-arid, with cold winters and hot summers. January temperatures range from about 7° F to 57° F 
and July temperatures range from 52° F to 97° F. Annual precipitation, mostly in the form of rain but some snow, is about 12 inches. 
Vegetation on the plateaus is primarily open piñon juniper woodland and shrubs. Mining operations can be conducted on a year-round 
basis. 

The community of Tusayan, seven miles northwest of the Canyon Mine, provides much of the housing and other facilities for people 
who work within Grand Canyon National Park. Seasonal population is from 500 to 1,000. A clinic run by a Phoenix hospital is operated 
at Grand Canyon Village inside the national park, as well as a K-12 grade school with a capacity of 250 students. Williams, a rural 
community, 44 miles south of the site at Interstate 40, has a population of approximately 2,500.  Williams relies heavily on tourism to 
maintain its economy, but many people are also involved in agriculture and forestry.  The town offers an elementary, middle and high 
school, an emergency medical center, shopping and a variety of community services. Although housing is available, lack of adequate 
water supplies has limited housing construction. Flagstaff, 56 miles southeast of the Canyon Mine, is a full-service city with a population 
of 70,000 and is the regional trade center for northern Arizona. 

68 

 
 
 
 
 
 
 
Arizona, and particularly Coconino County, is among the fastest growing areas in the United States, due to the climate, landscape 
diversity, and economic and recreational opportunities. Resources and services are often stretched to meet the needs of the growing 
population. 

Personnel for future mining operations are expected to be sourced from the nearby towns of Williams and Flagstaff, as well as other 
underground mining districts in the western United States. 

In addition to the mine shaft, existing mine infrastructure includes surface maintenance shops, employee offices and change rooms, a 
water well, an evaporation pond, explosives magazines, water tank, fuel tank, and rock stockpile pads. Electrical power is available 
through an existing power line that terminates at the site. 

Northern Arizona is part of the Colorado Plateau, a region of the western United States characterized by semi-arid, high-altitude, gently 
sloping plateaus dissected by steep walled canyons, volcanic mountain peaks, and extensive erosional escarpments.  The Canyon Mine 
is located on the Coconino Plateau within the Colorado Plateau, at an elevation of approximately 6,500 ft. 

Ownership 

The Canyon Project is held by Energy Fuels on nine unpatented claims (Canyon 64-66, 74-76, and 84-86) located on land managed 
by the USFS. A uranium royalty has been retained by the successors to Gulf Oil Company on the Property, however, the current validity 
of the royalty is under investigation by Energy Fuels. If valid, the royalty rate is a 3.5% weighted average price tied to the Atomic 
Energy Commission Circular 5. 

Holding costs for the Canyon Project are minimal and consist entirely of annual fees for unpatented mining claims ($155 per claim 
per year) and county filing fees (approximately $10 per claim per year). Unpatented mining claims expire annually, but are subject to 
indefinite annual renewal by filing appropriate documents and paying the fees described above. In addition, holders of unpatented 
mining claims on USFS lands are generally granted surface access by the USFS to conduct mineral exploration and mining activities. 

Permitting and Licensing 

The Canyon Project is located on public lands managed by the USFS and has an approved PO with the USFS. In September 2009, the 
groundwater General Aquifer Protection Permit was received for the water storage ponds. This permit was renewed in 2014. An Air 
Quality Permit was issued by the Arizona Department of Environmental Quality in March 2011, renewed in 2016 and amended in 
2017. The Company received EPA’s approval under the Clean Air Act National Emissions Standard for Hazardous Air Pollutants for 
the Canyon Project in September of 2015. 

Development of uranium-bearing breccia pipes of the Arizona Strip requires minimal surface disturbance, typically less than 20 acres. 
The overall environmental impact is small. Nevertheless, the areas in the vicinity of the Grand Canyon can be environmentally sensitive 
in many ways, and the permitting, development, and operation of a uranium extraction facility in this area has been a contentious issue. 
In 2009, as described below, over one million acres of federal land were withdrawn from mineral location, subject to valid existing 
rights. Reclamation at the Canyon Project is bonded at its total expected cost. 

Geological Setting 

Parts of two distinct physiographic provinces are found within Arizona: the Basin and Range province in the southern and western 
edge of the state, and the Colorado Plateau province in most of northern and central Arizona. The Arizona Strip lies within the Colorado 
Plateau province. 

Surface exposures within the Arizona Strip reveal sedimentary and volcanic rocks ranging in age from upper Paleozoic to Quaternary; 
the area is largely underlain by Mississippian through Triassic sedimentary rocks. However, exposed within the Grand Canyon are 
older rocks reaching Precambrian in age. 

Paleozoic sedimentary rocks of northern Arizona are host to thousands of breccia pipes. These deposits are known to extend from the 
Mississippian Redwall Limestone to the Triassic Chinle Formation, which makes about 4,000 feet of section. However, because of 
erosion and other factors, no single deposit has been observed cutting through the entire section. No deposit is known to occur above 
the Chinle Formation or below the Redwall Limestone. 

Breccia pipes within the Arizona Strip are vertical or near vertical, circular to elliptical bodies of broken rock. Broken rock is comprised 
of slabs and rotated angular blocks and fragments of surrounding and stratigraphically higher formations. Surrounding the blocks and 

69 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
slabs making up the breccia is a matrix of fine material comprised of surrounding and overlying rock from various formations. The 
matrix has been cemented by silicification and calcification for the most part. 

Breccia pipes are typically comprised of three interrelated features: a basinal or structurally shallow depression at surface (designated 
by some as a collapse cone); a breccia pipe that underlies the structural depression; and annular fracture rings, which occur outside of, 
but at the margin of the pipes. Annular fracture rings are commonly, but not always, mineralized. The structural depression may be up 
to 0.5 miles or more in diameter, whereas the breccia pipe diameters range up to about 600 feet; the normal range is 200 feet to 300 
feet. 

Mineralized breccia pipes found to date appear to occur in clusters or trends. Spacing between breccia pipes ranges from hundreds of 
feet within a cluster to several miles within a trend. Pipe location may have been controlled by deep seated faults, but karstification of 
the Redwall Limestone in Mississippian and Permian times is considered to have initiated formation of the numerous and widespread 
breccia pipes in the region. 

At the Canyon deposit, the surface expression of the pipe is a broad shallow depression in the Permian Kaibab Formation. The pipe is 
essentially vertical with an average diameter of less than 200 feet, but it is considerably narrower through the Coconino and Hermit 
horizons (80 feet). The cross sectional area is probably between 20,000 and 25,000 square feet. The pipe extends for at least 2,300 feet 
from the Toroweap limestone to the upper Redwall horizons. The ultimate depth of the deposit is unknown. 

Mineralization extends over about 1,500 vertical feet, with higher-grade mineralization found mainly in the Coconino, Hermit, and 
Esplanade horizons and at the margins of the pipe in fracture zones. Sulfide zones are found scattered throughout the pipe but are 
especially concentrated (sulfide cap) near the Toroweap Coconino contact, where the cap averages 20 feet thick and consists of pyrite 
and bravoite, an iron-nickel sulfide. The mineralized assemblage consists of  uranium-pyrite-hematite  with  massive copper sulfide 
mineralization common in and near the higher-grade zone. The strongest mineralization appears to occur in the lower Hermit-upper 
Esplanade horizons in an annular fracture zone. 

History 

Uranium exploration and mining of breccia pipe uranium deposits started in 1951 when a geologist employed by the U.S. Geological 
Survey noted uranium ore on the dump of an old copper prospect on the South Rim of the Grand Canyon of Northern Arizona. The 
prospect was inside the Grand Canyon National Park, but on fee land that predated the park. A mining firm acquired the prospect and 
mined this significant high-grade uranium deposit, called the Orphan Mine. By the time mining ended in the early 1960s, 4.26 million 
pounds of U3O8 and some minor amounts of copper and silver had been produced. 

After the discovery of the first deposit in the 1950s, an extensive search for other deposits was made by the government and industry, 
but only a few low-grade prospects were found. Exploration started again in the early 1970s. In the mid-1970s, Western Nuclear Inc. 
(“Western Nuclear”) acquired the Hack Canyon prospect located about 25 miles north of the Grand Canyon and found high grade 
uranium mineralization offsetting an old shallow copper/uranium site. In the next few years, a second deposit was found approximately 
one mile away. EFN acquired the Hack Canyon property from Western Nuclear in December 1980. Construction started promptly, and 
the Hack Canyon mine was in production by the end of 1981. 

The Canyon deposit is located on mining claims that EFN acquired from Gulf Mineral Resources Company (“Gulf”) in 1982. Gulf 
drilled eight exploration holes at the site from 1978 through May 1982, but found only low-grade uranium in this pipe. Additional 
drilling completed by EFN in 1983 identified a major deposit. EFN drilled a further 30 holes from May 1983 through April 1985 to 
delineate the uranium mineralization and to determine placement of the shaft and water supply well. Additional drilling of six holes 
was completed in 1994. Construction at the site was discontinued as a result of low uranium prices at that time. 

EFN identified and investigated more than 4,000 circular features in northern Arizona. About 110 of the most prospective features were 
explored by deep drilling, and approximately 50% of those drilled were shown to contain some uranium mineralization. Ultimately, 
nine deposits were deemed worthy of development. Total mine production from the EFN breccia pipes from 1980 through 1991 was 
approximately 19.1million pounds U3O8 at an average grade of just over 0.60% U3O8. 

Most of the EFN assets were acquired by Denison (then named IUC) in 1997 and by the Company in June 2012 upon acquisition of 
the US Mining Division. Since that time, Denison and later Energy Fuels has maintained ownership of the Canyon Project. 

Denison did not carry out any surface exploration on the Canyon Project since its acquisition of the project in 1997, nor has the Company 
to date. Exploration for breccia pipes in northern Arizona typically begins with a search for surface expressions of circular features. 
This search was aided by geologic mapping, Landsat aerial photography, thermal infrared imagery, geochemical testing, and certain 
geophysical methods such as resistivity, Very Low Frequency ("VLF"), and time domain electromagnetics. Other techniques tested 

70 

 
 
 
 
 
 
 
 
 
 
 
 
included: geobotany, microbiology, and biogeochemistry. All of these methods were utilized to identify surface expressions of breccia 
pipes. The key element of the process was to zero in on the throat of the pipe as a locus for drilling from the surface since the throat is 
usually associated directly with the center of the collapse. 

Mineralization 

Mineralization extends vertically both inside and outside the pipe over about 1,500 vertical feet, but high-grade mineralization has 
been found mainly in the collapsed portions of the Coconino, Hermit, and Esplanade horizons and at the margins of the pipe in fracture 
zones. Sulfide zones are found scattered throughout the pipe but are especially concentrated (within a sulfide cap) near the Toroweap- 
Coconino contact, where the cap averages 20 feet thick and consists of pyrite and bravoite, and iron-nickel sulfide. The mineralization 
assemblage consists of uranium-pyrite-hematite with massive copper sulfide mineralization common in and near high-grade zones. 
The strongest mineralization appears to occur in the lower Hermit-upper Esplanade horizons in an annular fracture zone. 

The two metals of interest within the Canyon breccia pipe are uranium and copper.  Since the rocks making up the breccia within the 
pipe are all sedimentary rocks, mineralization typically occurs within the matrix material (primarily sand) surrounding the larger clasts. 

Uranium mineralization at Canyon is concentrated in six stratigraphic levels or zones (Cap, Upper, Main, Main-Lower, Juniper I, and 
Juniper II) within a collapse structure ranging from 80 ft. to 230 ft. wide with a vertical extension from a depth of 650 ft. to over 2,100 
ft., resulting in approximately 1,450 feet of mineralization.  Intercepts range widely up to several tens of feet with grades in excess of 
1.0% U3O8. 

Consistent with other breccia pipe deposits, uranium at Canyon Mine occurs largely as blebs, streaks, small veins, and fine disseminations 
of uraninite/pitchblende (UO2). Mineralization is mainly confined to matrix material, but may extend into clasts and larger breccia 
fragments,  particularly  where  these  fragments  are  composed  of  Coconino  sandstone.  Uranium  mineralization  occurs  primarily  as 
uraninite and various uranium phase minerals with lesser amounts of brannerite and uranospinite. 

Copper mineralization occurs in concentrations within the Main and Main-Lower zones that have a reasonable prospect for eventual 
economic extraction. It is also present in the Juniper zones, but at much lower concentrations than the Main zone. 

Mineralization  can  be  disseminated  throughout  the  matrix  material  (commonly  replacing  calcite  cement)  with  higher-grade 
mineralization typically occurring as vug fills, blebs, or streaks within the matrix and sometimes zoning the breccia clasts. The highest 
grade  copper  mineralization  either  completely  replaces  the  matrix  cement  or  replaces  the  matrix  material  all  together.  Copper 
mineralization occurs primarily as tennantite, chalcocite and bornite with lesser amounts of covellite. Pyrite and sphalerite are also 
found throughout the pipe. Silver is commonly associated with the copper mineralization in the main zone. Assay values of silver in 
excess of one ounce per ton are common where copper grades are high.  Arsenic is present where tennantite mineralization occurs. 
Additionally, lower quantities of Zn, Pb, Mo, Co, Ni, and V are present and scattered throughout the pipe. 

Mineral Resource Estimate 

Mineral Resource estimates were prepared for the Canyon deposit using both historical surface drill hole gamma and assay data and 
gamma and assay data collected during underground drilling in 2016 and 2017. A model of the breccia pipe host was constructed based 
on drill logs and constrains the Mineral Resource. Mineralization wireframes for U3O8  were based on assays and gamma data at a 
nominal cut-off grade of 0.15%. Low and high-grade copper wireframes were based on nominal cutoff grades of 1% and 8% respectively. 
Values for U3O8 and copper were interpolated into blocks using inverse distance squared or ordinary kriging. Resources are presented 
a 0.36% U3O8 Eq equivalent cut-off grade for zones that contain both uranium and copper mineralization (Main and Main-Lower) and 
at a 0.29% U3O8 Eq cut-off grade for zones that contain only uranium mineralization (Cap, Upper, Juniper I, and Juniper II). 

There are no Mineral Reserves estimated at the Canyon deposit at this time. Additional underground drilling conducted by the Company 
in 2016 and 2017 allowed for the classification of measured and indicated mineral resources, and the inclusion of a copper Mineral 
Resource. In October 2017, RPA estimated the Mineral Resources for both uranium and copper, shown in the following tables. 

71 

 
 
 
 
 
 
 
 
 
 
 
Canyon Mine Mineral Resources – Uranium(1)(2)(3)(4)(5)(6)(7)

Zone 

Cut-off Grade 
% U3O8 Eq(8)

Tons 
(000) 

Grade 
% U3O8 

Pounds U3O8 
(000) 

Main 

Main 

Juniper I 

Cap 

Upper 

Main-Lower 

Juniper I 

Juniper II 

0.36 

0.36 

0.29 

0.29 

0.29 

0.36 

0.29 

0.26 

6 

94 

38 

0.43% 

0.89% 

0.94% 

139 

0.88% 

--- 

--- 

9 

5 

2 

1 

0.43% 

0.20% 

0.57% 

0.35% 

56 

1,669 

709 

2,434 

--- 

78 

20 

25 

9 

18 

0.38% 

134 

Classification 

Canyon Measured Resources (M) 

Canyon Indicated Resources (I) 

Total (M & I) 

Canyon Inferred Resources 

Total Inferred Resources 

Notes: 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  For the Main and Main-Lower zones, a 0.36% uranium equivalent cut-off grade (% U3O8 Eq) was applied to account for both 
the copper and uranium mineralization.  In all other zones only uranium was reported and a  0.29% U3O8 cut-off grade was applied. 
(The %U3O8 Eq grade term is not the same as the eU3O8 % grade term with indicates probe rather than assay data listed elsewhere 
in this report.  For details see the Canyon Technical Report). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$60 per pound and a copper price of US$3.50 per 
pound. 
(4)  A copper to U3O8 conversion factor of 18.19 was used for converting copper grades to equivalent U3O8 grades (U3O8 Eq) for 
cut-off grade evaluation and reporting for the Main and Main-Lower zones. 
(5)  Process recoveries used were 96% for U3O8 and 90% for Cu, based on preliminary metallurgical test work. 
(6)  Numbers may not add due to rounding. 
(7)  Tonnages of uranium and copper cannot be added as they overlap in the Main and Main-Lower zones. 
(8)  Note that the Tonnages of uranium and copper cannot be added as they overlap in the Main and Main-Lower zones. 

Canyon Mine Mineral Resources – Copper(1)(2)(3)(4)(5)(6)(7)

Classification 

Canyon Measured Resources (M) 

Canyon Indicated Resources (I) 

Total (M & I) 

Zone 

Main 

Main 

Main 

Canyon Inferred Resources 

Main-Lower 

Notes: 

Cut-off Grade 
% U3O8 Eq 

Tons 
(000) 

Grade 
% Cu 

Pounds 
Cu (000) 

0.36 

0.36 

0.36 

0.36 

6 

94 

9.29% 

1203 

5.70% 

10,736 

101 

5.93% 

11,939 

5 

5.90% 

570 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium equivalent (%U3O8 Eq) cut-off grade of 0.36% U3O8 Eq. 

72 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(3)  Mineral Resources are estimated using a long-term uranium price of US$60 per pound and a copper price of US$3.50 per lb. 
(4)  A copper to U3O8 conversion factor of 18.19 was used for converting copper grades to equivalent U3O8 grades (U3O8 Eq) for 
cut-off grade evaluation and reporting. 
(5)  Process recoveries used were 96% for U3O8 and 90% for Cu, based on preliminary metallurgical test work. 
(6)  Numbers may not add due to rounding. 
(7)  Tonnages of uranium and copper cannot be added as they overlap in the Main and Main-Lower Zones. 

Two cut-off grades were used for the resource estimate. For the uranium and copper bearing zones, a 0.36% uranium equivalent (%U3O8 
Eq) cut-off grade was used.  For the uranium-only zones, a 0.29% eU3O8  cut-off grade was used. The two cut-off grades account for 
separate process campaigns with different unit costs. 

Present Condition of the Property and Work Completed to Date 

At the Canyon Project, all surface facilities are in place. During 2017, an underground drilling program was completed, shaft sinking 
continued, and a large water tank was installed. As of March 8, 2018 shaft sinking had been completed.  The final depth of the shaft 
is approximately 1,470 feet below ground surface. Shaft stations are developed at depths of 1,000 feet (elevation 5,506 feet above sea 
level), 1,220 feet (elevation 5,286) and 1,400 feet (elevation 5,106). Construction of the main mine sump is underway. 

During 2017, laboratory and bench scale metallurgical test work was carried out at the White Mesa Mill and at the Australian Nuclear 
Science and Technology Organization ("ANSTO"), an independent testing firm in Australia. The copper is expected to be processed 
using acid leach followed by solvent extraction (the same method used for uranium). Following solvent extraction, a saleable copper 
product is expected to be produced by either electro-winning or copper sulfate crystallization. To recover copper from the Canyon 
mineralized material, some modifications to White Mesa Mill process circuits are expected to be required. The copper modifications 
are expected to include using the existing vanadium solvent extraction circuit for copper extraction, the addition of a roaster to improve 
copper recovery, and the addition of either an electro-winning circuit or copper sulfate crystallization circuit.  Preliminary bench test 
work  indicates  that  acid  leaching  after  roasting  pre-treatment  is  expected  to  result  in  average  copper  and  uranium  recoveries  of 
approximately  92%  and  91%  respectively.  Using  optimum  roasting  and  leaching  conditions,  it  is  expected  that  for  a  continuous 
operation, recoveries will improve and uranium recoveries will match the nominal 96% currently experienced at the White Mesa Mill. 
Production copper recoveries are expected to be in the 90% range. 

The Canyon Project was acquired by the Company in June 2012, through the acquisition of the US Mining Division from Denison. 
The cost of the Canyon Project has been fully impaired, and as of December 31, 2017, the total cost attributable to the Canyon Project 
and its associated equipment on the financial statements of the Company was nil. 

The Company’s Planned Work 

During 2018, the Company plans to complete the construction of the main mine sump at the Canyon Project before mid-year 2018, 
after which time field activities will have been completed. The Company plans to continue to carry out engineering, procurement 
and construction management activities in 2018, including additional bench and pilot plant scale metallurgical test work of the 
uranium/copper mineralization, as well as pursue any additional permitting actions that may be required to recover copper at the 
White Mesa Mill. The timing of our plans to extract and process mineralized materials from this project will be based on the results 
of this additional evaluation work, along with market conditions, available financing and sales requirements. 

73 

 
 
 
 
 
 
 
 
The Roca Honda Project 

Except as noted concerning land tenure and permitting efforts, the following technical and scientific description of the Roca Honda 
Project is based on a technical report titled "Technical Report on the Roca Honda Project, McKinley County, State of New Mexico, 
U.S.A." dated October 27, 2016, prepared by Robert Michaud, P.Eng., Stuart E. Collins, P.E., and Mark B. Mathisen, C.P.G., all of 
Roscoe Postle Associates (“RPA”) and Harold Roberts, then Executive Vice President of the Company, in accordance with NI 43-101 
(the “Roca Honda Technical Report”). The purpose of the Roca Honda Technical Report was to update the Preliminary Economic 
Assessment ("PEA") of the Project in light of changes in the Project ownership interest  and the acquisition of additional  mineral 
property. Each of the authors of the Roca Honda Technical Report is a “qualified person” and all but one is “independent” of the 
Company within the meaning of NI 43-101. Harold R. Roberts, P.E., was Executive Vice President, Conventional Operations of the 
Company at the time he co-authored the PEA; however, the independent authors of the Report have assumed overall responsibility for 
all items of the technical report, and the Report is therefore an independent technical report under NI 43-101. The Roca Honda Technical 
Report is available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. The Roca Honda Project does not have known 
reserves, and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature, despite currently ongoing 
permitting activities. 

We acquired most of the Roca Honda Project on August 29, 2013 as a result of our acquisition of Strathmore. Certain adjacent properties 
(the "Adjacent Properties") (which now form part of the Roca Honda Project) were acquired from Uranium Resources, Inc. ("URI") 
in June 2015. 

74 

 
 
 
 
 
Property Description and Location 

The  Roca  Honda  Project  is  an  underground  uranium  project  that  is  being  permitted  by  the  Company’s  wholly-owned  subsidiary, 
Strathmore Resources, U.S. Ltd. as operator of Roca Honda Resources, LLC (“RHR”).  RHR was established on July 26, 2007, when 
Strathmore formed a limited liability company with Sumitomo and transferred the property to RHR.  Strathmore purchased Sumitomo's 
40% interest in RHR on May 27, 2016. The Roca Honda Project is located approximately three miles northwest of the community of 
San Mateo, New Mexico, near the southern boundary of McKinley County and north of the Cibola County boundary, and approximately 
22 miles by road northeast of Grants, New Mexico. The property is located in the east part of the Ambrosia Lake subdistrict of the 
Grants Mineral Belt in northwest New Mexico and comprises nearly all of Sections 5, 6, 8, 9, 10, and a narrow strip of Section 11, the 
New Mexico State Lease, consisting of Section 16, and the fee mineral interest in Section 17, all in Township 13 North – Range 8 West 
(T13N-R8W), New Mexico Principal Meridian. Mineralized material from the Roca Honda Project will be shipped by highway truck 
to the White Mesa Mill, where it will be processed for the recovery of uranium. The Roca Honda Project does not have known reserves, 
and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature. 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Roca Honda property is located approximately 17 miles (22 miles by road) northeast of Grants, New Mexico. The southern part 
of the property, which are on Sections 16 and 17, can be reached by traveling north from Milan, New Mexico on State Highway 605 
toward the town of San Mateo to mile marker 18 and then north on a private gravel road. Access rights from Highway 605 onto Section 
16 have been subject to temporary agreements with the surface owner, Fernandez Company, the latest of which expired on December 
31, 2015. When the Company acquired the mineral rights to Section 17 in the URI transaction, it acquired surface access rights to 
Section 17 and Section 16, which the Company believes provides all necessary access. The Company is in discussions with the surface 
owner to determine whether any further access rights may be required. 

75 

 
 
 
 
 
 
The north part of the project can be reached by traveling 23.5 miles from Milan, New Mexico, on paved public Highway 605, and then 
west on US Forest Service roads to the southeast corner of Section 10. There are numerous drill roads that provide access to different 
portions of Sections 9 and 10, many of which will require maintenance. Old drill roads were previously established across the property, 
and an electrical line transects the northern half of Section 16 in the project area. The line continues on the west side of the project area 
into Section 17, where it terminates, and on the east side of Section 16 through the northwest quarter of Section 15 and along the 
southern section boundary of Section 10. There is a concrete lined, 14-foot diameter, 1,478-foot deep shaft, which was sunk by Kerr- 
McGee on Section 17 (the "Existing Shaft").  The Existing Shaft would need to be completed to a final depth of approximately 1,600 
feet for use in future mine activities. No milling operations are expected to occur on the site. 

The climate in the Roca Honda Project area may be classified as arid to semi-arid continental, characterized by cool, dry winters, and 
warm, dry summers. On average, the Roca Honda property receives approximately 11 inches of precipitation annually, most of which 
occurs during thunderstorms in July and August. Grants, New Mexico has an annual average temperature of 50°F, with an average 
summer high of 87°F and low of 52°F, and average winter high of 47°F and low of 18°F. Year-round operations are expected. 

The community of Grants, New Mexico, located in Cibola County, is the largest community near the Roca Honda Project. As of the 
2010 census, there are 8,772 people residing in Grants, where supplies can be obtained, and personnel experienced in underground 
mining, construction and mineral processing are available. 

The Roca Honda Project area is sparsely populated, rural and largely undeveloped. The predominant land uses include low density 
grazing and cultivation, and recreational activities such as hiking, sightseeing, and seasonal hunting. The Roca Honda property has 
moderately rough topography in Sections 9 and 10 and consists of shaley slopes below ledge-forming sandstone beds, as mesas, that 
dip 7° to 11° northeast. Elevations range from 7,100 feet to 7,800 feet. Section 9 consists mostly of steep slopes in the west and south, 
with a large sandstone mesa in the north central part. Section 10 consists mostly of the dip-slope of a sandstone bed that dips from 8° 
to 11° east. Sections 16 and 17 have less topographic relief, with elevations ranging from 7,100 to 7,300 feet and easterly dipping 
slopes. Vegetation in the Roca Honda Project area consists of grasses, piñon pine and juniper trees. 

Ownership 

Prior to May 27, 2016, the Roca Honda Project (excluding the Adjacent Properties) was held by RHR, a joint venture owned by Energy 
Fuels’ wholly-owned subsidiary Strathmore Resources, (US) Ltd. (60%) and Sumitomo’s subsidiaries SC Clean Energy and Summit 
New Energy Holding, LLC (together, 40%). On May 27, 2016 the Company acquired Sumitomo's 40% interest in RHR, and the Roca 
Honda Project is now held entirely by our wholly-owned subsidiary, Strathmore Resources, (US) Ltd.  As consideration for the 40% 
interest, the Company issued to Sumitomo 1,212,173 common shares of the Company and agreed to pay $4.5 million of cash upon the 
first commercial production of uranium from the Roca Honda Project.  The Adjacent Properties were acquired from URI in June 2015. 

The Roca Honda property covers an area of 4,440 acres, and includes 63 unpatented lode mining claims in Sections 9 and 10, 64 
unpatented claims in Sections 5 and 6, 36 unpatented claims in Section 8, one adjoining New Mexico State General Mining Lease in 
Section 16, and the fee minerals interest in all of Section 17.  The mining claims also extend onto a 9.4 acre narrow strip of Section 
11. The New Mexico State Lease was acquired by David Miller (the former Strathmore CEO) on November 30, 2004, and subsequently 
transferred to Strathmore. Strathmore then relinquished the Lease and acquired it again in December 2015 (State Mining Lease No. 
HG-0133) for a new 15-year term expiring on December 14, 2030. The "Roca Honda" Claims in Sections 5 and 6 were staked by Miller 
and Associates in September 2004 and assigned to RHR on August 28, 2013. Strathmore acquired the Adjacent Properties, comprised 
of the "Roca Honda" claims in Section 8 and the fee mineral interest in Section 17 on June 26, 2015 from URI. 

The State Mining Lease (No. HG-0133) issued by the New Mexico State Land Office for Section 16 covers an area of 638 acres. The 
surface of Section 16 is leased to Fernandez as rangeland for grazing. The area covered by the Fernandez lease is also referred to as 
“Lee Ranch”. The Mining Lease has a primary, secondary, tertiary, and quaternary term, each with rentals to be paid in advance, and 
will not expire until December 14, 2030. It can be held for the next two years (primary term) by paying only $1.00 per acre annually. 

The State lease stipulates a 5% gross returns royalty to the State of New Mexico "less actual and reasonable transportation and smelting 
or reduction costs, up to 50% of the gross returns" for production of uranium, which is designated a "special mineral" in the lease. New 
Mexico mining and private royalties on value of minerals extracted are shown below: 

• 
• 

Section 9 Gross Royalty (1%); and 
Section 16 New Mexico State Lease Royalty (5%). 

Under the rights acquired in the URI transaction, a gross royalty of 1% is payable to the surface owner. 

76 

 
 
 
 
 
 
 
 
 
 
 
Permitting and Licensing 

The Roca Honda Project is at an advanced stage of permitting. A Draft EIS was completed by the USFS in February 2013.  In March 
2015 the USFS initiated the scoping process for a new mine dewatering alternative to be addressed in a Supplement to the EIS. In 
September 2016, an additional scoping process to incorporate Section 17 (the "Adjacent Properties") and development drilling into 
the mine plan was initiated by the USFS. The Supplement to the EIS is expected to be completed in 2018 with a Final EIS and Record 
of Decision (ROD) scheduled to be completed in 2019. 

Other major permits required for the Roca Honda Project include a Permit to Mine to be issued by the New Mexico Mining and Minerals 
Division, a Discharge Permit issued by the New Mexico Environment Department, and a Mine Dewatering Permit issued by the New 
Mexico State Engineer’s Office. The Mine Dewatering Permit was approved in December 2013 but appealed by the Acoma Pueblo in 
January  2014.  RHR  subsequently  proposed  a  new  alternative  for  discharging  treated  mine  water  that  would  benefit  a  number  of 
downstream users including the Acoma Pueblo. As a result, the Acoma Pueblo agreed to withdraw the dewatering permit appeal in 
March 2015. The dewatering permit will need to be revised to reflect a higher dewatering rate with the addition of Section 17 to the 
mine plan. 

The two other major permits that are in the agency review stage are the draft Discharge Permit expected in late 2018, and the Permit 
to Mine expected in 2019 following approval of the Final EIS by the USFS. Permit approvals from the U.S. Army Corps of Engineers 
and the U.S. Environmental Protection Agency are also required for discharge of treated mine water associated with mine activities. 
Applications for these two permits are also presently undergoing agency review. 

As the project has not yet been developed or operated, we are not aware of any environmental liabilities of any significance. 

No permitting is required to start milling the Roca Honda Project material at the White Mesa Mill. The White Mesa Mill is fully 
permitted with the State of Utah, and has all the necessary operating licenses for a conventional uranium mill. As additional tailings 
storage capacity will eventually be required at the Mill over the life of the mine, an Amendment to the White Mesa Mill’s Radioactive 
Materials License issued by the Utah Division of Waste Management and Radiation Control will be required in due course to construct 
the next tailing cells. 

Geological Setting 

The Roca Honda Project area is located in the southeast part of the Ambrosia Lake sub-district of the Grants uranium district and is 
near the boundary between the Chaco slope and the Acoma sag tectonic features. This sub-district is in the southeastern part of the 
Colorado Plateau physiographic province and is mostly on the south flank (referred to as the Chaco slope) of the San Juan Basin. 

Rocks exposed in the Ambrosia Lake sub-district of the Grants Mineral Belt, which includes the Roca Honda Project area, comprise 
marine and non-marine sediments of Late Cretaceous age, unconformably overlying the uranium-bearing Upper Jurassic Morrison 
Formation. The uppermost sequence of conformable strata consists of the Mesaverde Group, Mancos Shale, and Dakota Sandstone. 
All rocks that outcrop at the Roca Honda Project area are of Late Cretaceous age. 

The uranium found in the Roca Honda Project area is contained within five sandstone units of the Westwater Canyon Member. Zones 
of mineralization vary from approximately one foot to 30 ft. thick, 100 ft. to 600 ft. wide, and 200 ft. to 3,000 ft. in length. Uranium 
mineralization in the Project area trends west-northwest, consistent with trends of the fluvial sedimentary structures of the Westwater 
Canyon Member, and the general trend of mineralization across the Ambrosia Lake sub-district. 

Core recovery from the 2007 drilling program indicates that uranium occurs in sandstones with large amounts of organic/high carbon 
material. Non-mineralized host rock is much lighter (light brown to light grey) and has background to slightly elevated radiometric 
readings. 

History 

Kerr-McGee Oil Industries, Inc. (“Kerr-McGee”) staked the Roca Honda Project unpatented mining claims in Sections 9 and 10 in 
June 1965. Kerr-McGee, its subsidiaries, and successor in interest Rio Algom had held the claims until the property was acquired by 
Strathmore on March 12, 2004. Energy Fuels acquired a 100% interest in Strathmore in September 2013, assuming Strathmore’s 60% 
ownership interest in RHR and becoming the project operator. Strathmore purchased Sumitomo's 40% interest in RHR on May 27, 
2016. 

Drilling on the property began in 1966. Kerr-McGee performed a number of rotary drill hole exploration programs from 1966 to 1985. 
In Section 9, the first drill hole was completed in July 1966. Discovery was made in drill hole number 7 completed on August 2, 1970, 

77 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
which encountered mineralization at a depth of 1,900 ft. From 1966 to 1982, a total of 187 drill holes were completed for a total of 
388,374 ft. 

In Section 10, the first hole was drilled in October 1967. Discovery was made in drill hole number 6 completed on March 19, 1974, 
which encountered mineralization at a depth of 2,318 ft. From 1967 to 1985, a total of 175 drill holes were completed for a total of 
459,535 ft. 

In Section 16, the first drilling was in the 1950’s by Rare Metals, which drilled 13 holes, including two that intercepted high-grade 
uranium mineralization at depths of 1,531 ft. and 1,566 ft. No records of the total drilled footage were located. Subsequently, Western 
Nuclear acquired a mining lease for Section 16 from the State and began drilling in 1968, with the first drill hole completed on August 
17, 1968. The second drill hole intercepted high-grade uranium mineralization at a depth of 1,587 ft. From 1968 through September 
1970, Western Nuclear drilled 63 holes totaling 121,164 feet, not including six abandoned holes totaling 7,835 ft. Two of the drill holes 
reported cored intervals, but the cores and analyses were not available. From the late 1960’s to the early 1980’s, a total of 725 drill 
holes totaling over 1,425,000 feet were completed on the six Sections (5, 6, 8, 9, 10 and 16) of the Roca Honda property. More than 
500 holes totaling over 841,900 feet were also drilled in Section 17 by Kerr-McGee and Western Nuclear.  In June 2015, Energy Fuels 
acquired a 100% interest in the mineral properties controlled by URI (Sections 8 and 17). 

RHR drilled four pilot holes on Section 16, of which three were completed as monitor wells totaling 8,050 feet for environmental 
baseline and monitoring purposes in Section 16 from June through November 2007. One drill hole was located outside of known 
mineralization, and three holes were located within mineralized areas. The entire thickness of the Westwater Sandstone, except for 
zones with no recovery, was cored in the pilot holes for these wells. The cores are PQ diameter (3.345 in.) and were taken principally 
for laboratory testing of hydraulic conductivity, effective porosity, density, and chemical analysis. 

In November 2011, a core hole was drilled at the Section 16 shaft location. The hole was drilled to a depth of 2,053 ft. Core was tested 
for numerous geotechnical properties. 

No historic mineral extraction has occurred on the property. 

Mineralization 

Uranium mineralization consists of unidentifiable organic-uranium oxide complexes. The uranium in the project area is dark grey to 
black in color, and is found between depths of approximately 1,450 feet and 2,600 feet below the surface. 

Primary mineralization pre-dates, and is not related to, present structural features. There is a possibility of some redistribution and 
stack mineralization along faults; however, it appears that most of the Roca Honda Project mineralization is primary. 

Paleochannels that contain quartz-rich, arkosic, fluvial sandstones are the primary mineralization control associated with this trend. 
Previous mining operations within the immediate area suggest that faults in the Roca Honda Project area associated with the San Mateo 
fault zone post-date the emplacement of uranium. Therefore, it may be expected that mineralized zones in the Roca Honda Project area 
are offset by faults. 

The mineralization is typically confined to sandstones in the Westwater Canyon Member, although there is some overlap into the shales 
that divide the sandstones, and also some minor extension (less than 10 feet) into the underlying Recapture Member. The mineralization 
is contained in the Westwater Canyon Member sandstones across the Project area, but in Sections 9 and 16, the  mineralization is 
typically found in the upper sandstones (A, B1, and B2), as it is in Section 17, also. In Section 10, the A and B1 sandstones pinch out 
in some areas due to thickening of the overlying Brushy Basin Member. Mineralization is in the middle and western portions of Section 
10, and is typically in the lower sandstones (sands C and D). 

Sedimentary features may exhibit control on a small scale. At the nearby Johnny M mine, a sandstone scour feature truncates underlying 
black mineralization, indicating nearly syngenetic deposition of uranium mineralization with the sandstone beds. 

Mineral Resource Estimates 

RPA prepared an updated PEA in 2016 and an NI 43-101 compliant Mineral Resource estimate for the Roca Honda Project is set out 
in the Roca Honda Technical Report. The Mineral Resource estimate, which has remained unchanged from the 2015 PEA effective as 
at February 4, 2015, is summarized in the following table. Mineral Resources are constrained by wireframes generated around individual 
mineralized zones within five sand horizons designated as A, B1, B2, C, and D sands. 

78 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Roca Honda Mineral Resources – Uranium(1)(2)(3)(4)

Classification 

Roca Honda Measured Resources (M) 

Roca Honda Indicated Resources (I) 

Roca Honda Total (M & I) 

Roca Honda Inferred Resources 

Notes: 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

208 

0.477% 

1,984 

1,303 

0.483% 

12,580 

1,511 

0.482% 

14,564 

1,198 

0.468% 

11,206 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium cut-off grade of 0.19% eU3O8. 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

Energy Fuels acquired the mineral rights to the Section 17 property adjacent to its main Roca Honda project in 2015.  An historical 
estimate for the Section 17 property was completed by Uranium Resources Inc. (“URI”) in 2007. URI estimated that the Section 17 
property contained approximately 510,000 tons at a grade of 0.37% U3O8 for 3.8 million pounds of uranium. This historical estimate 
is based on over 500 surface drill holes and was calculated using the circle tangent method.  A density of 15 cu ft./ton was used. 

RPA and the Company do not consider this historical estimate to be current mineral resources or reserves as defined under NI 43-101. 
While Energy Fuels has reviewed all the drill hole data associated with this estimate, a qualified person has not done sufficient work 
to  classify  this  historical  resource  as  current  mineral  resources  or  mineral  reserves  in  accordance  with  NI  43-101. This  historical 
estimate was unclassified.  The Company believes this historical estimate is relevant, as the methodology was well documented and 
utilized industry standard practice. However, the methodologies used do not reflect current best industry practices.  The Company 
does not consider these historical estimates to be equivalent to current mineral resources or mineral reserves as defined in NI 43-101, 
nor has the Company completed sufficient work to confirm a NI 43-101 compliant resource.  Therefore, the historical estimates cannot, 
and should not, be relied upon as NI 43-101 resources or reserves. 

Present Condition of the Property and Work Completed to Date 

Old drill roads were previously established across the property, and an electrical line transects the northern half of Section 16 in the 
project area. The line continues on the west side of the project area into Section 17, where it terminates, and on the east side of Section 
16 through the northwest quarter of Section 15 and along the southern section boundary of Section 10. Three monitor water wells were 
drilled by RHR in 2007, and are located on Section 16. Other items installed by RHR include a permanent electrical weather station 
and a high volume TSP and PM10 air samplers. Three, dry man-made impoundments are also located on Section 16. More than 400 
historic drill exploration holes were completed on the property from the late 1960’s to the early 1980’s. Except for the existing shaft 
on Section 17, there are no mine workings, existing tailings ponds, waste deposits or other improvements or facilities at the site. 

No additional exploration work has been conducted on the Roca Honda Project since November 2011, when a core drill hole was 
completed at the proposed shaft location in Section 16 for geotechnical studies. 

The Roca Honda Project was acquired by the Company in August 2013, through the  Company’s acquisition of Strathmore. As of 
December 31, 2017, the total cost attributable to the Roca Honda Project on the financial statements of the Company was $22.8 million. 

The Company’s Planned Work 

The Company intends to continue its permitting and related activities at the Roca Honda Project during 2018. Approximately $0.8 
million  is  budgeted  for  permitting  efforts  in  2018. The  Company  plans  to  integrate  the Adjacent  Roca  Honda  Properties  into  the 
permitting efforts underway for the Roca Honda Project properties. 

79 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Sheep Mountain Project 

Unless otherwise stated (concerning land tenure and permitting efforts), the following technical and scientific description of the Sheep 
Mountain Project is derived from a technical report titled “Sheep Mountain Uranium Project, Fremont County, Wyoming, USA, Updated 
Preliminary Feasibility Study, National Instrument 43-101 Technical Report”, dated April 13, 2012 and, prepared by Douglas L. Beahm, 
P.E., P.G., Principal Engineer of BRS Inc. in accordance with NI 43-101 (the “Sheep Mountain Technical Report”). The author of 
the Sheep Mountain Technical Report is a “qualified person” and is “independent” of the Company within the meaning of NI 43-101. 
The Sheep Mountain Technical Report is available on SEDAR at www.sedar.com. The Sheep Mountain Project does not have known 
reserves, and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature. 

Project Description and Location 

The Sheep Mountain Project is an underground and open pit uranium project. The Sheep Mountain Project was acquired on February 
29, 2012, as a result of the Company’s acquisition of Titan. The Sheep Mountain Project is located eight miles south of Jeffrey City, 
Wyoming within the Wyoming Basin physiographic province at the northern edge of the Great Divide Basin in central Wyoming. The 
project is located in portions of Sections 8, 9, 15, 16, 17, 20, 21, 22, 27, 28, 29, 30, 31, 32, and 33, Township 28 North, Range 92 West. 

The Sheep Mountain Project includes the Congo Pit, a proposed open pit uranium extraction facility, and the reopening of the existing 
Sheep  Underground  facility. Although  alternatives  were  considered,  the  recommended  recovery  method  in  the  Sheep  Mountain 
Technical Report includes the processing of extracted materials via an on-site heap leach facility. Material from the underground and 
open pit operations are expected to be commingled at the stockpile site located near the underground portal and in close proximity to 
the pit. At the stockpile, the mineralized material will be sized if needed, blended, and then conveyed via a covered overland conveyor 
system to the heap leach pad where it will be stacked on a double lined pad for leaching. The primary lixiviant will be sulfuric acid. 
Concentrated leach solution will be collected by gravity in a double lined collection pond and then transferred to the mineral processing 
facility for extraction and drying. The final product produced will be uranium concentrate (U3O8, also known as “yellowcake”). Since 
the Sheep Mountain Technical Report was completed, Energy Fuels has acquired the White Mesa Mill and the Nichols Ranch Plant, 
which creates the option to transport loaded resin to either of those facilities for stripping, and to the White Mesa Mill for drying, and 
packaging of yellowcake. 

80 

 
 
 
 
 
 
 
The preferred alternative for the development of the Sheep Mountain Project begins the operation with the open pit and heap leach 
facility and brings the underground component of the project into operation about five years later such that the forecasted end of 
extraction for both the open pit and underground components coincide. This approach defers a substantial amount of initial capital, 
minimizes risk, and allows for a gradual startup of site activities while maximizing resource recovery. Having the end of extraction 
coincide for both operations also optimizes the fixed costs of personnel and facilities. A preliminary feasibility study (“PFS”) for the 
project has been completed in accordance with NI 43-101, which includes the preliminary design and sequencing of the open pit and 
underground  operations  and  the  heap  leach  mineral  processing  facility.  Designs  and  sequencing  are  inclusive  of  pre-production, 
production, and decommissioning and reclamation. 

The current design for the Congo Pit includes typical highwall heights in the range of 100 to 400 feet, and reaches a maximum depth 
of 600 feet in localized areas in the southeast pit corner. The open pit design employs similar design parameters and mining equipment 
configurations to those used successfully in past Wyoming conventional operations. Highwall design is based upon the performance 
of past projects in the Sheep Mountain and Gas Hills districts, and includes an average highwall slope of 0.7:1, which reflects the 
average of a 10-foot bench width and 50-foot wall at a 0.5:1 slope. 

The underground method proposed  is also a conventional  method using a  modified room and pillar method, but utilizing  modern 
equipment such as jumbo drills and 7 cubic-yard scooptrams for haulage. A new double entry decline will be constructed starting at 
the Paydirt Pit and ending below the deposit. Haulage from the facility will be accomplished via a 36-inch conveyor within one of the 
double declines. The existing shafts will be used for ventilation purposes only, with exhaust fans mounted at both locations. If the 
existing borehole ventilation shafts can be rehabilitated, they will be used as intake shafts. 

In 2013, we submitted a revised PO to the BLM, which included redesign of the heap leach processing area and the option to potentially 
transport the mineralized material to an off-site processing facility. The revision to the PO is expected to give us more flexibility in 
processing the resources extracted from the Sheep Mountain Project. A Record of Decision giving BLM's final approval of the revised 
PO was issued on January 6, 2017. 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Sheep Mountain Project is located at approximate Latitude 42°24’ North and Longitude 107° 49’ West, within the Wyoming Basin 
physiographic province in the Great Divide Basin at the northern edge of the Great Divide Basin. The project is approximately eight 
miles south of Jeffrey City, Wyoming. The nearest commercial airport is located in Riverton, Wyoming approximately 56 miles from 
Jeffrey City on a paved two-lane state highway. The project is accessible via 2-wheel drive on existing county and two-track roads. 

The Sheep Mountain Project falls within the intermountain semi-desert weather province, with average maximum temperatures ranging 
from 31.1 °F (January and December) to 84.9 °F (July), average minimum temperatures ranging from 9.1 °F (January) to 49.2 °F (July), 
and average total monthly precipitation ranging from 0.36 -inches (January) to 2.04 -inches (May). The topography consists of rounded 
hills with moderate to steep slopes. Elevations range from 6,600 feet to 8,000 feet above sea level. The ground is sparsely vegetated 
with sage and grasses and occasional small to medium sized pine trees at higher elevations. Year-round operations are contemplated 
for the Sheep Mountain Project. 

Telephone, electric and natural gas service adequate for the planned extraction and mineral processing operations have been established 
at the Sheep Mountain Project. Electric service and a waterline have been extended via right-of-way issued by the BLM in 2011 to the 
existing Sheep 1 and 2 shafts. Adequate water rights are held by the Company for planned extraction and mineral processing operations 
but need to be updated with the Wyoming State Engineer with respect to type of industrial use, points of diversion, and points of use. 

We believe that sufficient surface rights are in place for all contemplated operations, including tailings storage areas, waste disposal, 
heap leach pads, and potential processing sites. 

Ownership 

The mineral properties at the Sheep Mountain Project are comprised of 192 unpatented mining claims (the Company added 13 claims 
to the 179 reported in the Sheep Mountain Technical Report) on land administered by the BLM; approximately 640 acres of State of 
Wyoming leases; and approximately 630 acres of private leases on fee lands. In February 2012, Energy Fuels purchased 320 acres of 
private surface overlaying some of the federal minerals covered by 18 of the claims. The purchased parcel includes the SW¼ SW¼ 
Section 28 and SE¼, E½ SW¼, and NW¼ SW¼ Section 29, T28N, R92W. A final payment of $5,000 was made in January 2016 for 
the purchased parcel. The combination of land holdings (including the 13 new claims) comprises approximately 4,675 acres and gives 
Energy Fuels mineral rights to resources as defined in the Congo Pit and the Sheep Underground areas. After the 2012 Technical Report, 
the Company increased the Sheep Mountain property size by 26 unpatented mining claims (approximately 520 acres) through the 

81 

 
 
 
 
 
 
 
 
 
 
 
acquisition of Strathmore. These contiguous claims form a larger buffer, with potential for additional uranium resources, along the 
west side of the Project. 

To maintain these mineral rights, the Company must comply with the lease provisions, including annual payments with respect to the 
State of Wyoming leases; private leases; BLM and Fremont County, as well as Wyoming filing and/or annual payment requirements 
to maintain the validity of the unpatented mining lode claims as follows. Mining claims are subject to annual filing requirements and 
payment of a fee of $155 per claim. Unpatented mining claims expire annually, but are subject to indefinite annual renewal by filing 
appropriate documents and paying the fees described above. ML 0-15536 will expire on 1/1/2024. Annual Payments to maintain ML 
0-15536 are $2,560 per year. The original private lease dated November 20, 2975 between McIntosh Cattle Company and Western 
Nuclear Inc. (the “Private Lease”) expired 11/20/2015. Properties covered by the Private Lease include: Township 28 North, Range 
92 West, 6th PM; Section 20: S½SW¼; Section 29: NW¼, SW¼SW¼; Section 30: SE¼NE¼, E½SE¼; Section 31: E½NE¼; Section 
32: E½NE¼; Section 33: S½NW¼. Since the date of the Sheep Mountain Technical Report, the Company no longer holds the Private 
Lease,  however  a  Surface  Owner’s Agreement  (originally  dated  January  27,  1970,  as  amended  on April  14,  1981  and  ratified  by 
assignees on April 16, 2007) covering the same parcels and a few select claims in the Sun-Mc area is still in effect. It carries a 2% mine 
value royalty for any material extracted from the subject lands, but no other payment obligations. 

The Sheep Mountain Project is subject to an overall sliding scale royalty of 1% to 4% due to Western Nuclear, based on the Nuclear 
Exchange Corporation Exchange (“NUEXCO”) Value. This royalty is currently at its maximum rate of 4%. Under Wyoming State 
Lease ML 0-15536, there is a royalty of 5% of the quantity or gross realization value of the U3O8, based on the total arms-length 
consideration received for uranium products sold. 

Uranium  mining  in Wyoming  is  subject  to  both  a  gross  products  (county)  and  mineral  severance  tax  (state). At  the  federal  level: 
aggregate corporate profit from mining ventures is taxable at corporate income tax rates, i.e. individual mining projects are not assessed 
federal income tax but rather the corporate entity is assessed as a whole. For mineral properties: depletion tax credits are available on 
a cost or percentage basis whichever is greater. The percentage depletion tax credit for uranium is 22%, among the highest for mineral 
commodities, IRS Pub. 535. 

Permitting and Licensing 

In June 2010, Titan commenced baseline environmental studies to support an application to the NRC for a Source Material and By- 
product Material License (the “License”) for operation of a heap leach facility. Work was also initiated on a revision to the existing 
WDEQ  Mine  Permit,  as  well  as  a  PO  for  the  BLM.  Baseline  studies  included  wildlife  and  vegetation  surveys,  air  quality  and 
meteorological monitoring, ground and surface water monitoring, radiological monitoring, and cultural resource surveys. 

Submission of the PO to the BLM was made in June 2011. The PO was accepted as complete by the BLM, and an EIS was initiated 
in August 2011. Energy Fuels revised the PO in July 2012, consistent with the modified plan presented in the Sheep Mountain Technical 
Report. In July 2013, the PO was again revised to reflect a new waste rock disposal layout for the open pit mine and an improved and 
more economical heap leach and processing facility. The revised PO also included the option of transporting mineralized material off- 
site for processing. The Final EIS was completed in August of 2016.  On January 6, 2017, the BLM issued its RoD and approved the 
PO. 

In October 2011, Titan submitted a draft revision to its existing Mine Permit 381C to WDEQ. WDEQ then provided Titan with review 
comments as part of its “courtesy review.” The permit revision was revised and resubmitted in January 2014. In July 2015, the revision 
was approved by WDEQ. The revision includes expansion of surface and underground mining operations and an updated reclamation 
plan consistent with current reclamation practices. 

Development of an application to the NRC for a license to construct and operate the uranium recovery facility has been taken to an 
advanced stage of preparation. This license would allow Energy Fuels to process the mineralized material into yellowcake at the Sheep 
Mountain Project site. The draft application to NRC for a Source Material License was reviewed in detail by the NRC in October 2011. 
The NRC audit report identified areas where additional information should be provided. The review and approval process for this 
license by the NRC is anticipated to take approximately four  years  from the date submitted to the NRC. Submittal  of the license 
application to the NRC is on hold pending the Company’s evaluation of off-site processing options for this project, and if a decision 
is made to proceed with an on-site uranium recovery facility, pending improvements in uranium market conditions. 

The heap leach facility has been permitted through the State of Wyoming and BLM, yet still requires NRC licensing.  The permitted 
capacity is 4 million tons of mineralized material which is 53% of the NI 43-101 Mineral Reserves declared.  An expansion to the heap 
leach facility (including permitting) will be required in the future to process the remaining 47% of the 43-101 Mineral Reserves. 

82 

 
 
 
 
 
 
 
 
 
 
Geological Setting 

A primary component of the geology for the Sheep Mountain Project is the Battle Spring Formation. Battle Spring is Eocene in age. 
Prior to deposition of the Battle Spring Formation and subsequent younger Tertiary formations, underlying Paleocene, Cretaceous, and 
older formations were deformed during the Laramide Orogeny. During the Laramide Orogeny, faults, including the Emigrant Thrust 
Fault at the northern end of the project area, were active and displaced sediments by over 20,000 feet. Coincident with this mountain 
building event, Paleocene and older formations were folded in a series of echelon anticlines and synclines, generally trending from 
southeast to northwest. The Battle Spring Formation was deposited unconformably on an erosional landscape influenced by these pre- 
depositional features. Initial stream channels transporting clastic sediments from the Granite Mountains formed in the synclinal valleys. 

The geologic setting of the Sheep Mountain Project is important in that it controlled uranium mineralization by focusing movement 
of the groundwaters, which emplaced the uranium into the stream channels, which had developed on the pre-tertiary landscape. The 
Battle Spring Formation and associated mineralization at the Sheep Mountain Project is bounded to the east by the western flank of 
the Sheep Mountain Syncline and to the west by the Spring Creek Anticline. To the north the system is cut off by erosion. To the south 
the Battle Spring continues into the northern portions of the Great Divide Basin. 

Mineralization occurs throughout the lower A Member of the Battle Spring Formation and is locally up to 1,500 feet thick. The upper 
B Member is present only in portions of the project and may be up to 500 feet thick. Although arkosic sandstone is the preferred host, 
uranium has been extracted from all lithologies. Grade and thickness are extremely variable depending on whether the samples are 
taken from the nose or the tails of a roll front. Typically the deposits range from 50 feet to 200 feet along a strike, five feet to eight feet 
in height, and 20 feet to 100 feet in width. Deposits in the Sheep Mountain Project area occur in stacked horizons from 7,127 feet in 
elevation down to 6,050 feet in elevation. 

History 

The Sheep Mountain Project was acquired by Energy Fuels on February 29, 2012, as a result of the Company’s acquisition of Titan, 
which is now a wholly owned subsidiary of Energy Fuels. Titan acquired the Sheep Mountain Project in two transactions in 2009. A 
50% working interest was acquired when Titan completed a business combination with Uranium Power Corp. (“UPC”) on July 31, 
2009. UPC is now a wholly-owned subsidiary of Energy Fuels. At that time, UPC and UPC’s US subsidiary (then called UPC Uranium 
(USA) Inc. and now called Energy Fuels Wyoming Inc.) became wholly-owned subsidiaries of Titan. The remaining 50% of the Sheep 
Mountain Project was owned by Uranium One Inc. (“U1”) which was UPC’s joint venture partner for the project. On October 1, 2009, 
Titan acquired U1’s 50% interest, giving Titan a 100% interest in the Sheep Mountain Project. On February 29, 2012, Energy Fuels 
acquired Titan (and its subsidiaries) at which point the Sheep Mountain Project became 100% owned by the Company. 

The Sheep Mountain Project was operated as an underground and open pit mine at various times in the 1970’s and 1980’s. 5,063,813 
tons of mineralized material were mined and milled, yielding 17,385,116 pounds of uranium at an average grade of 0.17% U3O8. Mining 
was suspended in 1988 and the project has been on care and maintenance since that time. 

Uranium was first discovered in the Crooks Gap District, which includes the Sheep Mountain Project, in 1953. While the original 
discoveries were aided by aerial and ground radiometric surveys, exploration activities were primarily related to drilling and exploratory 
trenching. Three  companies  dominated  the  district  by  the  mid-1950s: Western  Nuclear  Inc.  (“Western  Nuclear”),  Phelps  Dodge 
Corporation (“Phelps Dodge”), and Continental Uranium Corporation (“Continental”). Western Nuclear built the Split Rock mill at 
Jeffrey City in 1957 and initiated production from the Paydirt pit in 1961, Golden Goose 1 in 1966, and Golden Goose 2 in 1970. 
Phelps Dodge was the principal shareholder and operator of the Green Mountain Uranium Corporation’s Ravine Mine, which began 
production in 1956. Continental developed the Seismic Pit in 1956, the Seismic Mine in 1957, the Reserve Mine in 1961, and the 
Congo  Decline  in 1968. In 1967, Continental acquired the Phelps Dodge properties and in 1972, Western Nuclear acquired all of 
Continental’s Crooks Gap holdings. During the mid-1970’s Phelps Dodge acquired an interest in Western Nuclear, which began work 
on the Sheep Mountain I in 1974, the McIntosh Pit in 1975, and Sheep Mountain II in 1976. Western Nuclear ceased production from 
the area in 1982. Western Nuclear production from the Sheep Mountain I is reported to have been 312,701 tons at 0.107% U3O8. 
Subsequent to the closure of the Sheep Mountain I by Western Nuclear, during April to September 1987, Pathfinder Mines Corporation 
(“Pathfinder”) mined a reported 12,959 tons, containing 39,898 pounds of uranium at an average grade of 0.154% U3O8 from Sheep 
Mountain I. U.S. Energy-Crested Corp. (“USECC”) acquired the properties from Western Nuclear in 1988, and during May to October 
1988, USECC mined 23,000 tons from Sheep Mountain I, recovering 100,000 pounds of uranium for a mill head grade of 0.216% 
U3O8. The material was treated at Pathfinder’s Shirley Basin mill, 130 miles east of the Project. The Sheep Mountain I mine was allowed 
to flood in April 2007. UPC (then known as Bell Coast Capital) acquired a 50% interest in the property from USECC in late 2007. 
USECC later sold all of its uranium assets to U1. Titan acquired UPC’s 50% interest in the property when it acquired UPC by a plan 
of arrangement in July 2009. Titan acquired U1’s interest in the Sheep Mountain Project in September 2009. 

83 

 
 
 
 
 
 
 
 
During the National Uranium Resource Evaluation (“NURE”) program conducted by the DOE in the late 1970’s and early 1980’s, the 
project area and vicinity were evaluated. This evaluation included aerial gamma, magnetic, and gravimetric surveys, soil and surface 
water geochemical surveys and sampling, and geologic studies and classification of environments favorable for uranium mineralization. 

Approximately 4,000 holes were drilled in the project area historically (prior to 1988), most of which were open-hole rotary drilling, 
reliant upon down-hole geophysical logging to determine equivalent uranium grade % eU3O8. 

However, some core drilling for chemical analysis was also completed. The drill maps show hole locations at the surface and downhole 
drift, the thickness and radiometric grade of uranium measured in weight percent U3O8, elevation to the bottom of the mineralized 
intercept, collar elevation, and elevation of the bottom of the hole. 

In 2006, UPC completed a drilling program consisting of 19 holes totaling 12,072 feet. Two of the 19 holes were located in Section 
28 with the purpose of confirming the mineralization within the Sheep Underground mine area. The remaining 17 holes were completed 
in the planned  Congo  Pit to test both shallow  mineralization and to explore a deeper  mineralized horizon. This 2006  drilling  has 
confirmed the presence of mineralization in the shallow horizons of the Congo Pit area and has identified and extended roll front 
mineralization in the 58 sand along strike. 

Following the acquisition of UPC by Titan, five holes were drilled in the Congo Pit area in 2009 for a total of 1,700 feet. In situ mineral 
grades for 2009 drilling were determined by geophysical logging including both conventional gamma logging and state of the art 
Uranium Spectrum Analysis Tool. Titan also drilled in the Congo Pit area in 2010 62 exploratory drill holes and 5 monitor wells and 
2011 73 exploratory drill holes and 5 monitor wells. There were a total of 140 exploration holes drilled between 2009 and 2011, which 
total about 44,000 feet. 

No relevant exploration work other than this drilling has been conducted on the property in recent years. The project is located within 
a brownfield site, which has experienced past mine production and extensive exploration and development drilling. The initial discovery 
was based on aerial and ground radiometric surveys in the 1950s, but since that time exploratory work on the site has been primarily 
drilling. 

Mineralization 

Most of the mineralization in the Crooks Gap District occurs in roll-front deposits. Roll fronts have an erratic linear distribution but 
are usually concordant with the bedding. Deposits have been discovered from the surface down to a depth of 1,500 feet. The two major 
uranium minerals are uranophane and autunite. Exploration drilling indicated that the deeper roll-type deposits are concentrated in 
synclinal troughs in the lower Battle Spring Formation. Three possible sources for uranium have been suggested: post-Eocene tuffaceous 
sediments, leached Battle Spring arkoses, and Precambrian granites. Structural controls of uranium occurrences along roll fronts include 
carbonaceous siltstone beds that provide a local reducing environment for precipitation of uranium-bearing minerals, and abrupt changes 
in permeability along faults, where impermeable gouge is in contact with permeable sandstones. Uranium has also been localized along 
the edges of stream channels and at contacts with carbonaceous shales. 

Mineral Resources 

Mineral Resource and Mineral Reserve Estimates 

The Mineral Resource estimates for the Sheep Mountain Project are summarized in the following table. The Mineral Resource estimates 
presented herein have been completed in accordance with CIM Standards and NI 43-101. Based on the drill density, the apparent 
continuity of the mineralization along trends, geologic correlation and modeling of the deposit, a review of historic mining with respect 
to current resource projections, and verification drilling, the Mineral Resource estimate herein meets CIM criteria as an Indicated 
Mineral Resource. These Indicated Mineral Resources are not reserves within the meaning of SEC Industry Guide 7. See Cautionary 
Note  to  U.S.  Investors  Concerning  Disclosure  of  Mineral  Resources,  above.  Below  is  a  summary  of  the  total  Indicated  Mineral 
Resources(1) estimated for the Sheep Mountain Project: 

84 

 
 
 
 
 
 
 
 
 
 
 
Sheep Mountain Mineral Resources – Uranium(1)(2)(3)

Classification 

Sheep Mountain Measured Resources (M) 

Zone 

--- 

Sheep Underground 

Congo Pit Area 

Sheep Mountain Indicated Resources (I) 

Sun-Mc 

Total (M & I) 

G.T. Cut-off 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

--- 

0.30 

0.10 

0.10 

--- 

--- 

--- 

5,640 

0.117% 

13,245 

6,176 

0.122% 

15,040 

1,080 

0.093% 

2,000 

12,895 

0.117% 

30,285 

Sheep Mountain Inferred Resources 

--- 

--- 

--- 

--- 

--- 

Notes: 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.10 G.T. (2 ft. of 0.05% eU3O8  for 
the Congo Pit and Sun-Mc areas and 0.30 G.T. (6 ft. of 0.05% eU3O8) for the Sheep Underground. 
(3)  Numbers may not add due to rounding. 

This estimate includes deletion of the portions of the mineral resource model which falls within the historic limits in the Congo Pit 
estimated to have removed some 25% of the initial resource estimate and the total reported mined tonnage from the historic Sheep I 
underground mine. From review of the Sheep I and II as-built mine plans, it was apparent that little or no mineralized material was 
mined at the historic Sheep II and that only development work was completed. Historic underground mining in the Sun Mc area is 
estimated to have removed some 10% of the total resource. Although in many cases the mine maps showed remnant pillars, none of 
these areas were included in the mineral resource estimate. Thus, the estimate of current mineral resources is conservative with respect 
to the exclusion of areas affected by historic mining. Estimated mineral resources for potential open pit areas were diluted to a minimum 
mining thickness of two feet and a cutoff grade of 0.05% U3O8, which equates to a 0.10 GT cutoff. The cutoff of 0.10 GT used for 
estimating the Mineral Resources for the open pit areas is the same cutoff value as that used for estimating the Mineral Reserves at a 
$65/Lb uranium price.  The cutoff of 0.30 GT used for estimating the Mineral Resources for Sheep Underground is lower than the 0.45 
GT cutoff used for estimating the Mineral Reserves at a $65/Lb uranium price. Some of the Mineral Resources fall outside of the mine 
plan, whereas all of the Mineral Reserves fall within the mine plan. 

Mineral Reserves 

The estimate of mineral reserves for the Sheep underground extraction area is set out in the Sheep Mountain Technical Report. With 
respect to the open pit mineral reserves, mineral resources for the Congo, North Gap, and South Congo areas were combined into a 
single comprehensive mineral resource model. Open pit mine designs and sequencing was completed for all areas, and the resultant 
mineral reserve estimate reflects the current open pit mine designs and economic evaluations. These reserves have been calculated in 
accordance with NI 43-101 and should not be considered to meet the definition of reserves within the meaning of SEC Industry Guide 
7. Resources that are not reserves do not have demonstrated economic viability. See Cautionary Note to U.S. Investors Concerning 
Disclosure of Mineral Resources, above. 

Below is a summary of the total Probable Mineral Reserve estimate for the Sheep Mountain Project as calculated in accordance with 
NI 43-101: 

85 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Sheep Mountain Mineral Reserves – Uranium(1)(2)(3)(4)

Classification 

Sheep Mountain Proven Reserves 

Sheep Mountain Probable Reserves 

Total Proven and Probable Reserves 

Notes: 

Zone 

--- 

Open Pit 

Underground 

G.T. Cut-off 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

--- 

0.10 

0.45 

--- 

--- 

3,955 

0.115% 

3,498 

0.132% 

--- 

9,117 

9,248 

7,453 

0.123% 

18,365 

(1)  The Mineral Reserve estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. 
(2)  Mineral Reserves are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.10 G.T. (2 ft. of 0.05% eU3O8) for 
the Congo Pit and 0.45 G.T. (6 ft. of 0.075% eU3O8) for Sheep Underground. 
(3)  Mineral Reserves are estimated using a long-term uranium price of US$65 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

The Probable Mineral Reserves are fully included in the total Indicated Mineral Resources for the Congo Pit and are not additive to 
that total. The Probable Mineral Reserve is that portion of the Indicated Mineral Resource that is economic under estimated costs and 
assumed pricing conditions. The cutoff grade of 0.075% eU3O8 at a minimum mining height of 2 foot equates to a 0.10 GT cutoff for 
the Congo Pit. The cutoff grade of 0.075% eU3O8  at a minimum mining height of 6 feet equals a 0.45 GT cutoff used for the Sheep 
underground extraction area. The cutoff grade was determined based on an assumed uranium price of $65 per pound U3O8. 

Present Condition of the Property and Work Completed to Date 

The Sheep Mountain Project includes the Congo Pit, a proposed open pit uranium extraction facility, and the reopening of the existing 
Sheep Underground mining  facility. Mineral Extraction at the Sheep Underground mining  facility  was suspended in 1988  and the 
project has been on care and maintenance since that time. 

The Sheep Mountain Project does not currently have a processing facility. Transportation of mineralized materials to the White Mesa 
Mill is not economic at current or foreseeable uranium price levels. As a result, it will be necessary to permit and construct a heap leach 
or other processing facility at the site, or make arrangements to process Sheep Mountain mineralized materials at a third party processing 
facility. 

The Company is subject to liabilities for mine reclamation at the Sheep Mountain project. The Company maintains a bond in the amount 
of $950,000 with the State of Wyoming as security for these liabilities. The Company files an annual report with the State of Wyoming, 
and the amount of the bond may be adjusted annually to ensure sufficient surety is in place to cover the full cost of reclamation. The 
Company’s reclamation of the exploration drilling performed by Titan was deemed complete in October 2014; the drilling permit was 
terminated and that bond was fully released. 

The Sheep Mountain Project was acquired by  the Company in February 2012, through  the Company’s acquisition of Titan. As of 
December 31, 2017, the total cost attributable to the Sheep Mountain Project on the financial statements of the Company was $34.18 
million. 

The Company’s Planned Work 

The Company will continue to evaluate its options for processing Sheep Mountain mineralized material, including continuing to pursue 
permitting  for  a  heap  leach  facility  at  the  site,  evaluating  other  types  of  processing  facilities  at  the  site,  or  determining  whether 
arrangements can be made to process Sheep Mountain mineralized materials at a third party processing facility. Submittal of the license 
application to the NRC for a heap leach processing facility at the site is on hold pending the Company’s evaluation of off-site processing 
options for this project. The project is currently on standby, pending completion of the evaluation of the processing options for the 
Project and improvement in market conditions. 

86 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Henry Mountains Complex 

Except as noted below concerning the land and permitting efforts, the following  technical and scientific description of the Henry 
Mountains Complex is based on the technical report dated June 27, 2012 titled “Technical Report on the Henry Mountains Complex 
Uranium Property, Utah, U.S.A.”, prepared by William E. Roscoe, Ph.D., P.Eng., Douglas H. Underhill, Ph.D., C.P.G. and Thomas C. 
Pool, P.E. of Roscoe Postle Associates Inc. (“RPA”) in accordance with NI 43-101 (the “Henry Mountains Technical Report”). Each 
of the authors of the Henry Mountains Technical Report is “independent” of Energy Fuels and a “qualified person” for purposes of NI 
43-101. The report contains mineral resource estimates for the Indian Bench, Copper Bench, Southwest and Tony M deposits. The 
Henry Mountains Technical Report is available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. The Henry Mountains 
Complex does not have known reserves, and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature, 
despite uranium extraction activities occurring at the Tony M deposits as recently as 2008. 

Property Description and Location 

The Henry Mountains Complex is an underground project comprised of the Bullfrog Property, hosting the Indian Bench and the Copper 
Bench deposits, and the Tony M Property, hosting the Southwest deposit and the Tony M deposit and associated mineral extraction 
facilities. The Henry Mountains Complex is located in eastern Garfield County, Utah. 

87 

 
 
 
 
 
 
Accessibility, Climate, Local Resources, Infrastructure and Physiography 

Road access to the Henry Mountains Complex is by paved Highway 276, running between Hanksville and Bullfrog Basin Marina, 
Utah. An unimproved gravel road maintained by Garfield County extends west from Highway 276, passes by the portal of the Tony 
M Property, and extends northerly across the property, the northern end of which is crossed by another county road. The property is 
located in a relatively remote area of Utah, and the infrastructure is limited. The town site of Ticaboo, Utah, is located approximately 
five miles south of the property. Ticaboo has been used to provide housing and municipal services for Tony M Property staff. The next 
closest community is Hanksville, Utah, a small town of a few hundred people, located about 40 miles north of the property. During 
operation of the Tony M Property, electricity was generated locally. Materials and supplies are transported to the site by truck about 
275 miles from Salt Lake City, and about 190 miles from Grand Junction, Colorado. The distance to the White Mesa Mill is about 117 
miles. 

The climate is distinctly arid, with an average annual precipitation of approximately eight inches, including about 12 inches of snow. 
The vegetation consists primarily of small plants including some of the major varieties of blackbrush, sagebrush, and rabbit brush. A 
few small junipers are also present. Relief over the combined Henry Mountains Complex is approximately 2,250 feet (the technical 
report erroneously reported 800 feet). The elevation on the property ranges from 4,550 ft. above sea level at the portal of the Tony M 
Property, near the southern end of the property, to 6,800 ft. above sea level over the northern end of the property. The terrain is typical 
canyon lands topography,  with some areas deeply dissected by gullies and headwalls of canyons and the rest consisting of  gently 
undulating gravel benches covering the northern part of the project area. The terrain in several parts of the property is particularly 
rugged and inaccessible and is the primary reason for the irregular pattern of surface drill holes in parts of the property. 

88 

 
 
 
 
 
 
Ownership 

The Henry Mountains Complex is 100% owned by Energy Fuels, and was acquired from Denison Mines Corp. and its affiliates in June 
2012. The project consists of one Utah State Mineral Lease for Section 16, Township 35 South, Range 11 East (T35S R11E), Salt Lake 
Meridian (SLM), and 202 unpatented federal lode mining claims. The latter consist of 137 B.F., 19 Bull, 19 Star, two Frog claims 
(comprising the Bullfrog Property), and 17 TIC and eight Ticaboo claims, including fractions (comprising the Tony M property). The 
claims and state lease comprise one contiguous property located in T34S, R11E and T35S, R11E, SLM. The Utah State Section 16 
includes 638.54 acres, and the 202 unpatented lode mining claims consist of about 3,667.18 acres (not specified in the technical report), 
for a total land holding of 4,305.72 acres. The surface rights are owned by the federal government, administered by the BLM, with the 
exception of the State lease, which has associated state surface rights. 

There is no royalty burden for the 185 claims that comprise the Bullfrog Property, as well as for the Ticaboo claims. All unpatented 
mining claims are subject to an annual federal mining claim maintenance fee of $155 per claim plus approximately $10 per claim for 
county filing fees. The 17 TIC claims are held by Energy Fuels, subject to an annual advance minimum royalty. The uranium production 
royalty burden is 4% yellowcake gross value less taxes and certain other deductions. The vanadium production royalty burden is 2% 
gross value less certain deductions. The Utah State Lease carries an annual rental of $640, plus an escalating annual advance minimum 
royalty based on the uranium spot price. Since the technical report was written, the State lease was renewed in 2015 for an additional 
10-year term, which can be extended. Other changes in the renewed lease include reducing annual advanced royalty payments and 
crediting the advanced royalty against the production royalty for the year in which it is paid plus any amount paid in the five prior 
years. The uranium royalty on the State lease is 8% of gross value less certain deductions. The vanadium royalty on the State lease is 
4% of gross value less certain deductions. 

Tony M Property: 

Permitting 

The original Tony M Property mine permit was allowed to lapse. Subsequently the previous operator, Denison, filed for exploration 
permits with the Utah Division of Oil, Gas and Mining (“UDOGM”) and the BLM. These permits were granted by UDOGM and the 
BLM on December 2, 2005 and March 6, 2006, respectively, which enabled Denison to regain access, inspect and begin rehabilitation 
of the Tony M underground workings. Denison also began the permitting process for the Tony M Property. The permit application was 
submitted in November 2006 and a RoD and approved PO were received in September 2007. 

The PO was challenged by the Center for Water Advocacy and the Utah Chapter of the Sierra Club, which requested a Utah State BLM 
Director Review and a stay of the decision approving the Final PO for the Tony M Property. On November 21, 2007, the BLM State 
Director issued a decision vacating the previously issued permit and remanded the case to the Field Office in order that the EA for the 
Tony M Mine PO could be amended and a new RoD issued. As a result of this decision to vacate and renew, the request for stay was 
considered moot. The new decision was issued by the BLM on November 23, 2007 approving the PO for the project. The new decision 
was once again appealed by the Center for Water Advocacy and the Utah Chapter of the Sierra Club. The Utah State Director issued 
a decision denying the appeal and upholding the PO on February 19, 2008. In addition to the PO and FONSI from the BLM, major 
permits for the Tony M property include an approved Large Mine permit with UDOGM, and an approved ground water discharge 
permit with the Utah Division of Water Quality (“DWQ”). A reclamation bond of $708,537 is in place. 

Permit applications for a Phase 2 expansion were submitted to the BLM and UDOGM in 2008, but Denison subsequently requested 
that BLM and UDOGM review of the applications be deferred given the market conditions at that time. 

Bullfrog Property: 

The Company is currently completing environmental baseline studies and preparing mine plans for permitting purposes at the Bullfrog 
Property. An Exploration Notice of Intent was submitted to UDOGM and BLM in late 2016 to allow for drilling of 23 holes planned 
as offset/confirmation data and a few to be core holes to gather geotechnical and metallurgical information. The NOI has not been 
approved by DOGM and approval by BLM is pending additional information. 

Geologic Setting 

Exposed rocks in the project area are Jurassic and Cretaceous in age. Host rocks for the Copper Bench-Indian Bench and Tony M- 
Southwest  uranium-vanadium  deposits  are  Upper  Jurassic  sandstones  of  the  Salt Wash  Member  of  the  Morrison  Formation. This 
formation is located within the Colorado Plateau. Early Tertiary fluvial and lacustrine sedimentation within the deeper parts of local 
basins was followed in mid-Tertiary time by laccolithic intrusion and extensive volcanism. Intrusions of diorite and monazite porphyry 
penetrated the sediments at several sites to form the laccolithic mountains of the central Colorado Plateau. 

89 

 
 
 
 
 
 
 
 
 
 
 
 
The Morrison Formation is a complex fluvial deposit of Late Jurassic age. In outcrop, the Salt Wash is exposed as one or more massive, 
ledge-forming sandstones, generally interbedded with laterally persistent siltstones or mudstones. The lower Salt Wash is approximately 
150 ft. thick in the Project area, thinning and becoming less sandy northward from the project area. Sandstones comprise 80% of the 
sequence, with siltstones and mudstones making up the remainder. Significant uranium mineralization occurs only in this lower unit. 

History 

In 1970 and 1971, Rioamex Corporation conducted a 40-hole drilling program in an east-west zone extending across the southerly end 
of the Bullfrog Property and the northerly end of the Tony M and adjacent Frank M properties. Some of these holes intercepted significant 
uranium mineralization. The Bullfrog deposit was initially explored by Exxon Minerals Company (“Exxon”), while the Tony M deposit 
was explored and advanced by Plateau Resources Ltd. (“Plateau”), a subsidiary of Consumers Power Company (“Consumers”) of 
Michigan. 

In February 1977, drilling commenced in what was to become the Tony M deposit. Subsequently, Plateau drilled more than 2,000 rotary 
drill holes totaling about 1,000,000 feet. Over 1,200 holes were drilled in the Tony M area. Following the discovery of the Tony M 
deposit in 1977, Plateau developed the Tony M Property from September 1, 1977, to about May 1984, at which time mining activities 
were suspended. By January 31, 1983, over 18 miles of underground workings were developed at the Tony M Property, and a total of 
approximately 237,000 tons of mineralized material was extracted with an average grade of 0.121% U3O8  containing about 573,500 
pounds U3O8. The underground workings at the Tony M Property are accessed via two parallel declines extending about 10,200 ft. into 
the deposit. The underground workings were allowed to flood after mining activities were suspended in 1984. The southern one-half 
of the underground workings remained dry, as they are located above the static water table. 

Exxon commenced drilling on the Bullfrog Property in 1977. Before it sold the property to Atlas in July 1982, Exxon had drilled 1,782 
holes.  From  July  1982  to  July  1983, Atlas  completed  112  drill  holes  delineating  the  Southwest  and  Copper  Bench  deposits  on 
approximately 100 ft. centers. After July 1983, Atlas completed an additional 49 core hole drilling program throughout the Bullfrog 
Property, as well as a 133 rotary drill hole program to delineate the Indian Bench deposit on approximately 200 ft. centers. 2,232 drill 
holes were completed on the Bullfrog Property. 

The Southwest and Copper Bench deposits are delineated by drilling on approximately 125-foot centers. The Indian Bench deposit is 
delineated by drilling on approximately 200 ft. centers. In some areas, the rugged terrain made access difficult, resulting in an irregular 
drill pattern. Records indicate that 81 core holes were drilled in the Southwest, Copper Bench, and Indian Bench deposits, while 25 
core holes were drilled in the vicinity of the Tony M deposit. The core holes provided samples of the mineralized zone for chemical 
and amenability testing. 

Denison acquired the Bullfrog Property when it purchased most of the assets of EFN in 1997. In February 2005, Denison acquired the 
Tony M Property bringing it under common ownership with the Bullfrog Property. Following rehabilitation work at the Tony M Property 
and re-establishment of surface facilities in 2006, Denison received operational permits, reopened the Tony M underground workings 
and  commenced  mining  activities  in  September  2007. This  work  included  a  long-hole  drilling  program  to  discover  and  delineate 
mineralization within about 100 feet of underground workings. In November 2008, Denison announced that mining activities at the 
Tony M Property would be suspended due to uranium and economic market conditions. During its September 2007 to December 2008 
reactivation, cleanup and mining activities, Denison extracted 162,384 tons of mineralized material at radiometric grade of 0.131% 
containing 429,112 pounds U3O8 from within existing workings and from the previously stockpiled material. This material was trucked 
to the White Mesa Mill for processing. In June 2012, Energy Fuels acquired all of Denison’s uranium properties in the United States, 
including the Henry Mountains Complex. 

No mine development has been conducted on the Southwest portion of the Tony M-Southwest deposit or on the Copper Bench-Indian 
Bench deposit located further north. 

Energy Fuels has carried out no exploration work on the Henry Mountains Complex. 

Mineralization 

Uranium mineralization in the Henry Mountains Complex is hosted by favorable sandstone horizons containing detrital organic debris. 
Mineralization  primarily  consists  of  coffinite,  with  minor  uraninite,  which  usually  occurs  in  close  association  with  vanadium 
mineralization. Mineralization occurs as intergranular disseminations, as well as coatings and/or cement on and between sand grains 
and organic debris. Vanadium occurs as montroseite (hydrous vanadium oxide) and vanadium chlorite in primary mineralized zones 
located below the water table (i.e., the northern portion of the Tony M deposit). Historic production records from the AEC for the South 

90 

 
 
 
 
 
 
 
 
 
 
 
Henry Mountains district suggest that the vanadium content of the district is relatively low. Based on the review of the available analyses, 
RPA is of the opinion that the V2O5:U3O8 ratio ranges from about 1.3:1 to about 2.0:1 in the Henry Mountains Complex deposits. 

The  Henry  Mountains  Complex  vanadium-uranium  deposits  consist  of  two  extensive  elongate,  tabular  zones  containing  a  large 
concentration of mineralization. The Tony M–Southwest deposit extends for a distance of approximately 2.5 miles along a north-south 
trend and has a maximum width of about 3,000 ft. The larger Copper Bench-Indian Bench deposit extends approximately 3.5 miles 
along a northwesterly trend to the northeast of the Tony M–Southwest deposit. 

Mineral Resource Estimates 

Mineral Resources of the Tony M-Southwest deposit were estimated by Denison in 2009 using the GT contour method, and Mineral 
Resources of the Copper Bench-Indian Bench deposit were estimated in 1993 by EFN using the polygonal block method. These Mineral 
Resources are not reserves within the meaning of SEC Industry Guide 7. 

Henry Mountains Complex Mineral Resources – Uranium(1)(2)(3)(4)

Classification 

Henry Mountains Measured Resources (M) 

Henry Mountains Indicated Resources (I) 

Total (M & I) 

Henry Mountains Inferred Resources 

Total Inferred Resources 

Notes: 

Zone 

--- 

Tony M(2)

Southwest(2)

Indian Bench(3)

Copper Bench(3)

Tony M(2)

Southwest(2)

Indian Bench(3)

Copper Bench(3)

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

--- 

--- 

1,030 

0.24% 

660 

220 

500 

0.25% 

0.40% 

0.29% 

--- 

4,830 

3,300 

1,740 

2,930 

2,410 

0.27% 

12,800 

650 

210 

250 

500 

0.17% 

0.14% 

0.42% 

0.32% 

1,610 

0.25% 

2,170 

580 

2,090 

3,240 

8,080 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources for Tony M and Southwest are estimated at a uranium grade x thickness (G.T.) cut-off of 0.20 G.T. (2 ft. 
of 0.10% eU3O8).  This cut-off is estimated using a long-term uranium price of US$60 per pound U3O8. 
(3)  Mineral Resources for Indian Bench and Copper Bench are estimated at a uranium grade x thickness (G.T.) cut-off grade 0.80 
G.T. (4 ft. of 0.20% eU3O8). This cut-off is estimated using a long-term uranium price of US$40 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

The EFN resource estimate was audited by RPA and accepted as a current Mineral Resource estimate for Energy Fuels under NI 43-101. 

Present Condition of the Property and Work Completed to Date 

The following section has been prepared by the Company and is not based exclusively on the Henry Mountains Technical Report. 

The Tony M Property was developed from 1977 to 1983 with a double entry system including two parallel declines spaced 50 ft. apart. 
The declines measure 9 feet by 12 feet in cross- section, have crosscuts on 50-foot centers, have a minus 3% grade, serve as the primary 
fresh air intake, and are 10,200 feet in length. By January 31, 1983, over 18 miles of underground workings had been developed at the 

91 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Tony M Property. The underground workings were allowed to flood after mining activities were suspended in 1984. The southern one- 
half of the underground workings remained dry, as they are located above the static water table. 

The underground workings were planned as a random room and pillar approach with pillar extraction by a retreat system. Mining 
equipment consisted of slushers and rubber-tired, five- to ten-ton capacity load-haul-dump units. Exhaust ventilation was provided by 
five bored ventilation shafts, six feet in diameter, each with a 75-HP exhaust fan mounted at the shaft collar. 

By early 2007, work on reactivating the Tony M Property was carried out by Denison, and surface and underground rehabilitation and 
repairs were conducted. Surface facilities to support mining activities were constructed, including administration and maintenance 
facilities, site power and communications, and an evaporation pond for evaporation of water from the underground workings. Worker 
housing was established in the town of Ticaboo, Utah. As rehabilitation work advanced, ventilation was re-established. The water level 
in the underground workings rose to historic pre-mining activity levels, and upon reaching the flooded workings, dewatering activities 
were also initiated. During the rehabilitation work, limited amounts of “cleanup mineralized material” were removed. As areas of the 
underground  workings  were  made  ready  for  mining  activities,  extraction  of  mineralized  materials  increased  steadily.  Dewatering 
continued at an average rate of 125 gallons per minute during these activities. Denison placed the Tony M Property on temporary 
closure status at the end of November 2008, and dewatering activities have ceased. The project is being maintained in a state ready to 
resume operations as market conditions warrant. All of the Company housing and property in Ticaboo has been sold by Energy Fuels. 

There is no existing infrastructure on the Bullfrog Property. 

The Henry Mountains Complex was acquired by the Company in June 2012, through the acquisition of the US Mining Division from 
Denison. The cost of the Henry Mountains Complex has been fully impaired, and as of December 31, 2017, the total cost attributable 
to the Henry Mountains Complex and its associated equipment on the financial statements of the Company was nil. 

The Company’s Planned Work 

The Company intends to continue its evaluation activities at the Bullfrog Property during 2018. The Company is also conducting care 
and maintenance activities on the Tony M Property, in order to maintain it on standby, pending improvements in uranium prices. The 
planned drilling in the permitting stage will be postponed until the uranium price improves sufficiently. 

92 

 
 
 
 
 
 
 
The La Sal Project 

Unless stated otherwise concerning land tenure and permitting efforts, the following technical and scientific description of the La Sal 
Project is derived from a technical report titled "Technical Report on La Sal District Project (Including the Pandora, Beaver, and Energy 
Queen Projects), San Juan County, Utah, U.S.A.", dated March 25, 2014, prepared by Douglas C. Peters, CPG, of Peters Geosciences, 
in accordance with NI 43-101 (the “La Sal Technical Report”). The La Sal Technical Report includes an updated NI 43-101 compliant 
Mineral Resource estimate. The author of the La Sal Technical Report is a “qualified person” and “independent” of the Company within 
the  meaning  of  NI  43-101. A copy  of  the  La  Sal Technical  Report  is available  on  SEDAR  at  www.sedar.com  and  on  EDGAR at 
www.sec.gov. The La Sal Project does not have known reserves, and is therefore considered under SEC Industry Guide 7 definitions 
to be exploratory in nature, despite uranium extraction activities occurring as recently as 2012. 

Project Description & Location 

The La Sal Project is an underground project that consists of four mineral properties within close proximity of one another, including 
(from east-to-west) the Pandora (Snowball) Property, the Beaver (La Sal) Property, the Redd Block Property, and the Energy Queen 
Property. The La Sal Project is located in San Juan County, Utah near the town of La Sal. Other properties within the La Sal Project 
(but not described in the La Sal Technical Report) include the Pine Ridge property, east of the Pandora property, and unpatented mining 
claims west of the Energy Queen Property. 

The La Sal trend, which includes the La Sal Project, has a long history of uranium and vanadium production. Deposits from this district 
have been successfully milled at several historic mills in the region including Union Carbide’s (Umetco's) mill at Uravan, Colorado, 
the Climax Uranium mill in Grand Junction, Colorado, the Atlas mill at Moab, Utah and Energy Fuels’ White Mesa Mill near Blanding, 
Utah. 

93 

 
 
 
 
 
 
Operations at the La Sal Project are currently on standby. The extraction of all resources at the La Sal Project has been by conventional 
underground methods for over 40 years and, once mining activity resumes, will continue by such methods. These methods have been 
used very successfully in the region for over 70 years. The nature of the Salt Wash uranium-vanadium deposits require a random room 
and pillar mining configuration. The deposits are accessed from the surface via declines depending on the depth to mineralization and 
geologically suitable sites for portals, as is the case for the La Sal and Pandora/Snowball Properties. Deposits may also be accessed 
through vertical shafts, such as the shafts located at the Beaver and Energy Queen Properties. The Salt Wash uranium deposits are 
usually thinner than the underground height needed for personnel and equipment access. Therefore, the mineralized material is often 
extracted by employing a split-shooting method, which serves to separate mineralized material and waste as it is broken. 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The La Sal Project is easily accessed from the all-weather Utah State Highway 46. Utah 46 enters the project land near the southwest 
corner of ML-49313 (Section 36, T28S, R24E) about three miles east of the intersection of Utah 46 with U.S. Highway 191 at La Sal 
Junction. Utah 46 stays within or very near the project land for the next 9 miles to the east. All State and U.S. highways in this area 
are paved roads. 

The area is semi-arid. Temperatures range between an average low of 41°F to an average high of 72°F. Less than ten inches of precipitation 
falls per year. Winters are not severe, although there are numerous snow storms, the temperature drops below 0°F at times, and snow 
can accumulate to over a foot in the lower areas and more than two feet at times on Pine Ridge. The region of the La Sal Project central 
area is characterized by a broad shallow valley of hay fields and pasture lands at an elevation between 6,400 and 7,000 feet. Hills cut 
by small canyons occur at the west end and even higher elevations of about 7,800 feet are reached at Pine Ridge on the east end. All 
elevations within four miles of the center and west end of the property support moderate growths of sage and rabbitbrush along with 

94 

 
 
 
 
 
 
other brush, forbs, cactus, yucca, and grasses. Higher elevations contain juniper and piñon pine in the rocky soils along with scrub oak, 
aspen, and ponderosa pine on Pine Ridge to the east. 

La Sal, Utah is a small town, currently home to about 200 people. It has been a hub to area ranchers, uranium and copper miners, and 
oil and gas workers for many years. Larger population centers of Moab and Monticello, Utah are 22 miles north and 34 miles south, 
respectively, from La Sal Junction on Highway 191. Before the cessation of mining activities at the Beaver and Pandora Properties in 
late 2012, many of the workers also came from the Nucla-Naturita and the Dove Creek areas of Colorado, each about 55 miles away 
to the east and south, respectively. Larger cities with industrial supply houses include Cortez, Colorado about 100 miles to the south 
and Grand Junction, Colorado about 140 miles to the north. 

Electric transmission and distribution lines exist throughout the project area, of sufficient size to supply the load the projects demanded 
in the past. Several substations exist, and the electricity supply is adequate for additional demand. Natural gas is also available for any 
future production needs. 

Ownership 

The La Sal Project is held by Energy Fuels’ subsidiary, EFR Colorado Plateau LLC under private surface use and access leases, private 
mineral leases, Utah State Mineral Leases, San Juan County surface use, access, and mineral leases, and, after the Company reduced 
the property position by dropping claims without affecting the Mineral Resource, 210 unpatented mining claims on land managed by 
the BLM or USFS, that are either owned by Energy Fuels (81 claims) or leased by Energy Fuels (129 claims). After the claim drop, 
the total land package now consists of approximately 9,080 acres. The unpatented claims cover about 3,350 acres, the seven Utah State 
leases total approximately 2,220 acres, the San Juan County leased land contains just over 263 acres, and the six separate surface access 
and nine private parcel mineral leases apply to a total of 3,170 acres. The property covers all, or parts of the following Sections: Sections 
31, 32, and 33, T28S, R25E; Sections 4, 5, 6, and 7, T29S, R25E; Sections 25, 26, 31, 32, 33, 34, 35, and 36, T28S, R24E; Sections 
1, 2, 3, 4, 5, 6, 7, 11, and 12, T29S, R24E; Section 36, T28S, R23E; and Sections 1, and 12, T29S, R23E, SLBM, San Juan County, 
Utah. 

Annual holding costs consist of rental fees to the BLM at $155 per year per claim, due on or before September 1st each year. An affidavit 
of the payment to the BLM must be filed with the appropriate County each year for a nominal fee of about $10 per claim. This applies 
to all unpatented claims whether owned or leased by Energy Fuels. Annual holding costs for State leases and private leases vary, ranging 
between $500 and $13,500 for State Leases and $480 and $20,340 for private leases. The Company is also required to pay production 
royalties at varying rates for unpatented mining claims and private leases. The Utah State production royalties are fixed at 8% on 
uranium and 4% on vanadium. 

The Company generally has entered into surface access agreements sufficient to allow access for its mining activities. 

Permitting 

Mineral extraction facilities on private and public lands in Utah require an approved Notice of Intent (“NOI”) with the Utah Division 
of Oil, Gas and Mining (“UDOGM”). If the facility generates water, a ground water discharge permit is required for the treatment 
plant and ponds, and a surface water discharge permit is required for discharge of treated water. Both permits are issued through the 
State of Utah Division of Water Quality ("DWQ"). Air permits for air emissions including radon are issued by the Utah Division of 
Air Quality (“DAQ”); however, smaller mines are typically exempt. Water well permits, water rights, and stream alteration permits 
are also issued through the DWQ. On federal land, all the state permits listed above are required, as well as a Plan of Operations 
approved through a NEPA review by the responsible federal land managing agency. 

The Company’s mineral facilities at the La Sal Project are all existing facilities in historic mining areas, and approvals by the BLM 
and USFS have been obtained under EAs and Findings of No Significant Impact (“FONSIs”) under NEPA. The Energy Queen and 
Redd Block IV Properties are located on private land and were permitted with UDOGM in the early 1980s by Union Carbide. The 
Energy Queen Property was developed and has conducted mineral extraction, but the Redd Block IV Property was discontinued soon 
after the start of construction. A mine and reclamation plan amendment for the Energy Queen Property was approved by the UDOGM 
on September 22, 2009. This amendment allows the Company to install water treatment and other new surface facilities to support 
extraction of up to 250 tons per day (“tpd”) of mineralized materials. Water discharge permits to allow initial and ongoing discharge 
of water from underground workings were also approved by the DWQ in 2009. Energy Fuels initiated permitting plans for additional 
facility expansion in 2012, but then deferred these plans when the Redd Block IV resource was acquired in the Denison acquisition. 
Engineering studies are being conducted to determine if the Redd Block IV resource can be extracted from the Energy Queen shaft 
and surface facilities. If this proves to be the case, the Energy Queen UDOGM permit would be updated to include the Redd Block IV 
area as well as other resources that have been acquired since the 2009 amendment. A Small Source Exemption that is in place for air 
emissions would also need to be replaced with an air permit because of the increased surface disturbance. 

95 

 
 
 
 
 
 
 
 
 
 
Though currently in standby status, existing mining operations at the Pandora, Beaver, La Sal and Snowball Properties are fully permitted 
with the State of Utah, the BLM, and the USFS.  In order to allow expansion of the existing mines, Energy Fuels is in the process of 
obtaining regulatory approvals for expansion of the Pandora, Beaver, and La Sal operations through the UDOGM, the BLM, and the 
USFS. In late 2014, an EA, draft Decision Notice and FONSI were issued for public comment. In March 2015, in response to an 
objection filed by an environmental interest group, the USFS ruled that additional analysis was required before a modified Plan of 
Operations and EA could be approved for the proposed expansion. An expanded EA was finalized by the USFS and BLM in September 
2017 and forwarded to Washington DC offices of the BLM for approval. On February 23, 2018, the BLM and USFS issued the EA, 
Decision Record (BLM)/Decision Notice (USFS), and FONSI approving the expansion, conditional upon the Company incorporating 
certain specific requirements into the Plan of Operations amendment and having the required reclamation bond in place. All other 
regulatory approvals needed for project expansion, including an air emissions permit, are in place. 

Geologic Setting 

The Colorado Plateau covers nearly 130,000 square miles in the Four Corners region of the U.S. The La Sal Project and other properties 
held by Energy Fuels lie in the Canyon Lands Section in the central and east-central part of the Colorado Plateau in Utah and Colorado. 
The Colorado Plateau’s basement rocks are mostly Proterozoic metamorphics and igneous intrusions. The area was relatively stable 
throughout  much  of  the  Paleozoic  and  Mesozoic  Eras  with  minor  uplifts,  subsidences,  and  tiltings  resulting  in  fairly  flat-lying 
sedimentary rocks ranging from evaporites, limestones, and marine clastic sediments, through eolian sandstones, to detritus of fluvial 
systems. 

The significant uranium deposits in the La Sal Project occur in the late Jurassic Morrison Formation. The Morrison comprises two 
members in the La Sal area. The lower member, the Salt Wash, is the main uranium host. The upper part of the Morrison is the Brushy 
Basin Member; it is from 350 to 450 feet thick. The Salt Wash, approximately 300 feet thick, consists of about equal amounts of fluvial 
sandstones and mudstones deposited by meandering river systems flowing generally toward the east. The Brushy Basin was deposited 
mostly on a large mud flat, probably with many lakes and streams. Much of the material deposited to form the Brushy Basin originated 
from volcanic activity to the west. The majority of the recovered uranium has come from the upper sandstones of the Salt Wash Member 
known as the Top Rim (historically referred to as the “ore-bearing sandstone” or OBSS), which ranges from about 60 feet to 100 feet 
thick. 

Light-brown and gray sandstones and conglomerates of the 200-foot thick Cretaceous Burro Canyon Formation overlie the Brushy 
Basin. These crop out in the eastern part of the La Sal Project (over the Pine Ridge, Pandora, and La Sal/Snowball properties). This 
formation contains interbedded green and purplish mudstones with a few thin limestone beds. The Burro Canyon Formation is exposed 
covering the Brushy Basin at the west end of the La Sal Project, on the State sections and claims west of the Energy Queen. Locally, 
silicification altered the limestones to chert and some of the sandstones to orthoquartzite. Orthoquartzite cobbles and boulders litter 
the Brushy Basin slopes. In the central part of the La Sal Project (Beaver, Redd Block, and Energy Queen), the Burro Canyon is covered 
by a layer of alluvium and gravels shed from the La Sal Mountains to the north. These gravels vary in thickness from a thin veneer to 
over 120 feet thick. 

The La Sal District uranium-vanadium deposits are similar to those elsewhere in the Uravan Mineral Belt. Host rocks within the areas 
surrounding the La Sal Project consist of oxidized sediments of the Morrison Formation, exhibiting red, hematite-rich clastic rocks. 
Individual deposits are localized in areas of reduced, gray sandstone and gray or green mudstone. The Morrison sediments accumulated 
as oxidized detritus in the fluvial environment. However, there were isolated environments where reduced conditions existed, such as 
oxbow lakes and carbon-rich point bars. During early burial and diagenesis, the through-flowing ground water within the large, saturated 
pile of Salt Wash and Brushy Basin material remained oxidized, thereby transporting uranium in solution. When the uranium-rich 
waters encountered the zones of trapped reduced waters, the uranium precipitated. Therefore, deposits vary greatly in thickness, grade, 
size, and shape. Vanadium may have been leached from iron-titanium mineral grains and subsequently deposited along with, or prior, 
to the uranium. 

History 

Numerous underground mines near outcrops in the eastern part of the La Sal trend (in the La Sal Creek Canyon District) were mined 
for vanadium during the early 1900s. Sometime after World War II (approximately 1948-1954), exploration work on Morrison Formation 
outcrops in the west end of the district resulted in the discovery of the Rattlesnake mine (open pit) two miles west-southwest of the 
Energy Queen shaft. Deeper deposits of the central La Sal trend (in the area of the La Sal Project) were discovered in the 1960s and 
developed for production in the 1970s through vertical shafts and declines. The La Sal Project and La Sal Creek District production, 
through 1980, amounted to about 6,426,000 pounds U3O8 (average grade of 0.32% U3O8) and nearly 29,000,000 pounds V2O5 (average 
grade of 1.46%). Most production in the district was derived from fluvial sandstones, mainly in the upper part of the Salt Wash Member 
of the Morrison Formation of Jurassic age. 

96 

 
 
 
 
 
 
 
 
The Pandora Property was operated by Atlas Minerals in the 1970s and early 1980s. Umetco Minerals (Union Carbide) operated the 
Snowball, La Sal, and Beaver properties during the same time period. The Energy Queen property, then known as the Hecla Shaft, was 
started in 1979 by the Union Carbide/Hecla Joint Venture. The Energy Queen stopped mining activities in 1983 due to inadequate 
uranium prices. GEUMCO (General Electric Uranium Mining Company) operated the Pine Ridge property in the late 1970s, producing 
from  a  sandstone  lens  in  the  Brushy  Basin  Member  of  the  Morrison  Formation.  Pine  Ridge  was  acquired  by  Minerals  Recovery 
Corporation in 1981, which developed a decline to the Salt Wash Member of the Morrison Formation, but halted mining activities 
before any significant extraction of mineralized materials. A small project conducted mining activities in the eastern part of Section 2 
(ML-49596) during the early 1980s. The amount of uranium extracted from this project is unknown. Low uranium and vanadium prices 
forced all mining activities throughout the district to cease about 1991. Mineralized materials from these projects have been successfully 
processed at the Company’s currently operating White Mesa  Mill, and the now dismantled Uravan Mill (Umetco) and Moab Mill 
(Atlas). 

Denison (previously named International Uranium Corporation, or “IUC”) began mining activities at the Pandora Property in 2006 
and later from the Beaver shaft and La Sal decline. During the 2007 to 2013 time period, 446,000 tons of mineralized material were 
mined from the La Sal Complex and processed at the White Mesa Mill. This material had an average grade of 0.20% U3O8 and 1.02% 
V2O5 and contained 1,774,000 pounds of uranium and 9,098,000 pounds of vanadium. 

From 2008 through mid-2012, Denison drilled 225 exploration and fill-in (confirmation) holes in the project area. Energy Fuels drilled 
another 27 holes on the Energy Queen Property and the State land to the northwest of the Energy Queen Property from 2007 through 
2012. Due to declining uranium prices, mining activities ceased in October 2012 at the Beaver/La Sal Property and in December 2012 
at the Pandora Property. Both projects were put on a standby status and are currently maintained in conditions that would allow them 
to be placed back into production within a few months’ time. 

The Company owns the data on some 2,200 drill holes within the boundary of the property held as the La Sal Project. 

Mineralization 

The uranium- and vanadium-bearing minerals occur as fine-grained coatings on the detrital grains. They fill pore spaces between the 
sand grains, and they replace some carbonaceous material and detrital quartz and feldspar grains. The primary uranium mineral is 
uraninite (pitchblende) (UO2) with minor amounts of coffinite (USiO4OH). Montroseite (VOOH) is the primary vanadium mineral, 
along with vanadium clays and hydromica. Traces of metallic sulfides occur. In outcrops and shallow oxidized areas of older mines in 
the surrounding areas, the minerals now exposed are the calcium and potassium uranyl vanadates, tyuyamunite, and carnotite. 

Some stoping areas in the Beaver/La Sal and Pandora/Snowball Properties are well over 1,000 feet long and several hundred feet wide. 
The  Indicated  Mineral  Resources  of  the  Redd  Block  and  Energy  Queen  Properties  identified  through  drilling  are  of  similar  size. 
Individual mineralized beds vary in thickness from several inches to over 6 feet. Throughout much of the La Sal district there are three 
horizons in the Top Rim that host the mineralization. They are 25-40 feet apart. 

Kovschak and Nylund (1981) report no apparent disequilibrium problems in the other mining episodes of the La Sal area. Mining 
activities and  milling by Denison and Energy Fuels shows that  well-calibrated gamma probes equate  well to the mill head grades 
indicating  no significant disequilibrium exists. This is  generally true of the Salt Wash uranium deposits because  of the age of the 
mineralization and the hydrologic history of the host rocks. Therefore, Energy Fuels has no reason to anticipate any disequilibrium 
conditions within the unmined portions of the deposits on the project property. 

Mineral Resources Estimates 

Since the La Sal Project covers a length of ten miles and includes several project sites and facilities, the La Sal Project was divided 
into four blocks: Pandora, Beaver/La Sal, Redd Block and Energy Queen. The mineral resource estimation for the La Sal Project is 
based on the gamma logs from 1,993 historic rotary drill and core holes, 247 holes drilled by Energy Fuels and Denison from 2007 to 
2012, and approximately 500 underground long holes. Mineral Resource estimates have been calculated using a modified polygonal 
method. The mineralization in the La Sal Project is interpreted as being hosted in the Top Rim sandstone of the Salt Wash Member of 
the Morison Formation. Total thickness of the host sandstone is between 60 and 100 feet. 

97 

 
 
 
 
 
 
 
 
 
 
La Sal Mineral Resources – Uranium and Vanadium(1)(2)(3)(4)(5)

Classification 

Zone 

Energy Queen 

Redd Block 

Beaver/La Sal 

La Sal Measured Resources (M) 

Pandora 

Energy Queen 

Redd Block 

Beaver/La Sal 

La Sal Indicated Resources (I) 

Pandora 

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

Grade 
% V2O5 

Pounds 
V2O5 (000) 

262 

336 

215 

196 

81 

35 

9 

7 

0.19% 

0.19% 

0.19% 

0.18% 

0.17% 

0.07% 

0.18% 

0.14% 

971 

0.97% 

1,260 

0.98% 

800 

701 

268 

47 

33 

19 

0.98% 

0.94% 

0.87% 

0.35% 

0.96% 

0.73% 

5,100 

6,615 

4,199 

3,682 

1,409 

249 

173 

99 

Total (M & I) 

1,142 

0.18% 

4,100 

0.94% 

21,525 

Energy Queen 

Redd Block 

Beaver/La Sal 

La Sal Inferred Resources 

Pandora 

Total Inferred Resources 

Notes: 

43 

95 

29 

18 

0.09% 

0.09% 

0.11% 

0.12% 

79 

0.48% 

171 

0.47% 

67 

44 

0.60% 

0.66% 

417 

900 

352 

232 

185 

0.10% 

362 

0.51% 

1,902 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off of 0.20 G.T. (2 ft. of 0.10% eU3O8). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound U3O8  and a vanadium price of US 
$6.50 per pound V2O5. 
(4)  The average V2O5:U3O8 ratio used for estimating the vanadium Mineral Resources is 5.25:1. This value was based on historical 
milling of the mineralized material at White Mesa Mill. 
(5)  Numbers may not add due to rounding. 

Present Condition of the Property and Work Completed to Date 

Permanent structures existing at the Energy Queen Property include the head frame and a metal building containing an office, shop, 
showers, warehouse, and the hoist. The compressor is located in a separate building. One cased vertical ventilation hole was established 
into the underground working level. A small water treatment building and settling ponds are located on the San Juan County land in 
Section 5. In the past, water was treated with barium chloride to remove radium. 

The Beaver and La Sal Properties are accessed through the La Sal decline with rubber-tired equipment. The principal shop, offices, 
and warehouse facilities used by all properties in the district are housed at the surface facilities of the La Sal decline. There are large 
fenced yards, as well as buildings for equipment and supply storage. It is used as a central receiving site for bulk and large orders, 
which are then distributed to the other Energy Fuels’ properties in the district and other parts of the region. The shop areas include 
facilities specific to electrical equipment, drills, mobile diesel equipment, and welding. Engineering, geology, safety, environmental, 
and supervisory and clerk offices are located here. There are also staff and underground crew’s dry rooms. Ample stockpile space is 
available for easy truck load-out for transporting mineralized material to the White Mesa Mill. Electrical lines and substations exist 
and are adequately sized for any future extraction potential of the Mineral Resources. The Beaver and La Sal Properties are dry, so no 
water treatment facilities are needed. 

98 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The surface infrastructure at the Beaver shaft location consists of the hoist house, hoist, and head frame. The shaft is 690 feet deep to 
the underground haulage level at the loading pockets top grizzlies, and 750 feet total depth. There are three pockets, two of 70-ton 
capacity and one of 90-ton capacity. This arrangement allows for separation of mineralized material and waste. The skips dump into 
a bin from which the mineralized material is trucked a short distance to a stockpile and subsequently loaded in to the trucks for haulage 
to the White Mesa Mill. The shaft conveyance system is certified for man trips, although the routine access for personnel is through 
the La Sal decline. Another building houses the compressors, which supply compressed air for the underground workings in the Beaver 
Project. Power lines and substations are in place. The Beaver Property is dry underground; therefore, no water treatment facilities exist. 

Access into the Pandora Property is through a decline with rubber-tired equipment. Surface facilities here are less than at the other 
projects. They consist of a small office and shop buildings. A third building is used for storage of materials and equipment. Power lines 
exist to the property with enough capacity for the required load of potential future mining activities. The Pandora Property is dry 
underground. 

In 1980, Umetco was planning to sink another shaft to access the Redd Block Mineral Resources. The project did not progress far. The 
infrastructure at the Redd Block Property associated with a possible new shaft consists of a cleared and leveled site large enough for 
future construction of all surface facilities that would be required. The power line and transformers are installed, and the concrete base 
for a compressor building has been poured. As mining activities progress, a water table in the Salt Wash sandstone host horizon will 
be between the current Beaver Property western underground workings advance and the east end of the Redd Block Mineral Resources. 
Seven monitor wells were installed by Denison around this proposed shaft site. 

Five surety bonds, totaling $1,186,700 have been posted with regulatory authorities to secure reclamation at the various project facilities. 

The Company acquired the Energy Queen Property in December 2006. The remainder of the  La Sal Project, was acquired by the 
Company in June 2012, through the acquisition of the Denison US Mining Division. The cost of the La Sal Project has been fully 
impaired, and as of December 31, 2017, the total cost attributable to the La Sal Project and its associated equipment on the financial 
statements of the Company was nil. 

The Company’s Planned Work 

The Company intends to continue its permitting and related activities at the La Sal Project during 2018, as described under the heading 
"Permitting," above. The Company is also conducting care and maintenance activities on the facilities at the various properties within 
the La Sal Project, in order to maintain them on standby, pending improvements in uranium prices. Energy Fuels has evaluated numerous 
targets for additional surface drilling at the La Sal Project. However, there are no plans to perform the drilling in 2018. 

During 2018, the Company plans to rehabilitate the La Sal mine access decline, which has deteriorated during the last 5 years of standby 
status. 

99 

 
 
 
 
 
 
 
 
The Daneros Project 

Unless otherwise stated concerning land tenure and permitting efforts, the following scientific and technical description of the Daneros 
Project is derived from a technical report titled “Updated Report on The Daneros Mine Project, San Juan County, Utah, U.S.A.,” dated 
March 2, 2018, prepared by Douglas C. Peters, Certified Professional Geologist, of Peters Geosciences, Golden, Colorado in accordance 
with NI 43-101 (the “Daneros Mine Technical Report”). The author of the Daneros Mine Technical Report is a “qualified person” 
and is “independent” of the Company within the meaning of NI 43-101. The Daneros Mine Technical Report is available on SEDAR 
at www.sedar.com and on EDGAR at www.sec.gov. The Daneros Project does not have known reserves, and is therefore considered 
under SEC Industry Guide 7 definitions to be exploratory in nature, despite uranium extraction occurring as recently as 2012. 

Project Description and Location 

The Daneros Project is an underground project located in the Red Canyon portion of the White Canyon District in San Juan County, 
Utah, approximately 65 miles west of the White Mesa Mill. The Company holds a 100% interest in various groups of mining claims, 
including Daneros and adjoining historical sites, which can be developed in conjunction with the Daneros Project. 

The previous owner of the Daneros Project, Utah Energy Corporation (“UEC”), gathered the necessary environmental data and obtained 
the approvals to open an underground uranium project in May 2009. UEC commenced active mining activities, including constructing 
a decline into the main Daneros deposit. The first loads of mineralized material from the Daneros Project were delivered to the White 
Mesa Mill in December 2009, and a toll milling campaign was conducted in the second half of 2010. The Daneros Project was acquired 
by the Company in June 2012 along with all of Denison’s U.S. Mining Division. Prior to being placed on standby in October 2012, 
mineralized material from the Daneros Project was delivered to the White Mesa Mill and processed for Energy Fuels’ account. 

100 

 
 
 
 
 
The  extraction  of  all  resources  in  the  Daneros  Project  is  by  conventional  underground  methods.  These  methods  have  been  used 
successfully in the region for over 70 years. The nature of the Shinarump uranium deposits requires a random room and pillar mining 
configuration. The  deposits  have  irregular  shapes  and  occur  within  several  close-spaced,  flat  or  slight-dipping  horizons.  Uranium 
mineralization often rolls between horizons. The use of rubber-tired equipment allows the workers to follow the mineralized material 
easily in the slight dips and to ramp up or down to the other horizons. The deposit is accessed from the surface through a 450 feet 
decline at a gradient of  -15%. The Shinarump deposits are  usually thinner than the underground height needed for personnel and 
equipment access. Therefore, the mineralized material is extracted by a split-shooting method. The project also employs an underground 
long-hole exploration drilling program, reaching out as much as 400 feet ahead of and adjacent to the workings, as guided by the project 
geologist. 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Daneros Project is located 3.3 miles southwest of Fry Canyon, Utah and is accessed via Radium King Road, which is maintained 
by San Juan County, approximately 13 miles south of Utah Highway 95. A series of bulldozed tracks and drill roads provide access 
throughout the project area, but access to the mesa tops is very limited. Electric power is generated on site. The shipping distance from 
the Daneros Project to the White Mesa Mill is about 65 miles. 

The  semi-arid  climate  of  the  White  Canyon  area  is  characterized  by  large  daily  and  yearly  temperature  ranges  and  total  annual 
precipitation of approximately 10 to 16 inches, mostly as sporadic, intense summer thunderstorms typical of the Colorado Plateau 
region. Winter snowfall is moderate and rarely stays on the ground very long. Weather conditions pose no impediment to year round 
work on the project. 

Apart from previous mining activities, the only commercial land use purposes are cattle grazing and tourism activities such as hiking 
and mountain biking. Due to a shortage of water and thin soils, much of the White Canyon area is unsuitable for agriculture. 

101 

 
 
 
The project area is remotely located relative to water and power infrastructure. Housing for workers is mostly in camp trailers in Fry 
Canyon, or they commute from Blanding, Utah 65-miles to the east or farther. Blanding is a town large enough to host regional industrial 
activities, including stores and supply houses of sufficient size and inventory to meet most of the needs of an operation the size of the 
Daneros Project. 

The project area is located along a north-south trending canyon, which is a tributary to Red Canyon, also known as Bullseye Canyon. 
The Red Canyon drainage flows westerly for approximately 25 miles to the Colorado River where it joins Lake Powell at the head of 
Good Hope Bay. The project portal area comprises steeply sloping, rocky ground and scree along the eastern slope of Bullseye Canyon. 
Very steep to vertical, and at times overhanging, cliffs 400 feet high rise from the slope about 250 feet above the portal. 

Vegetation in the project area consists of sagebrush, juniper and piñon in the hills and slopes, while desert grasses, forbs, and shrubs 
are evident within the valley floors and on the mesa tops. Elevations in the region range from about 5,300 feet at the Fry Canyon 
townsite to over 7,000 feet on the surrounding mesa tops. The project portal is at about 5,750 feet above sea level. 

Ownership 

The Daneros Project is owned by the Company’s subsidiary EFR White Canyon Corp. The property consists of 141 unpatented mining 
claims located on federal land administered by the BLM in San Juan County, Utah, plus the State lease totaling approximately 3,072 
acres. The property lies in Sections 1, (11, and 12 were dropped in 2014) T37S, R15E, SLM, Sections (4 dropped in 2014), 5, 6, 7, 8, 
(10, 11, 15, 17 dropped in 2014), and 18, T37S, R16E (and Section 31 and 33, T36S, R16E dropped in 2014). 

The mining claims are maintained by making annual payments of US $155 per claim per year to BLM due September 1st each year, 
along with a nominal filing fee paid to the county within 30 days of the BLM filing of about $10 per claim. Work expenditures are not 
required. Holders of unpatented mining claims are generally granted surface access to conduct mineral exploration and mining activities. 
However, additional mine permits and plans are generally required prior to conducting exploration or mining activities on such claims. 

A number of the claims bear production royalties. Claims hosting the Daneros deposit are subject to royalties ranging between 15% 
of "market value" of the mineralized material and 2.5% of gross proceeds as described in further detail in the Daneros Mine Technical 
report. Other claims are owned by the Company without encumbrances. The State lease carries the standard Utah royalty of 8% on 
uranium and 4% on vanadium. 

Sufficient surface rights are in place for contemplated mining activities and waste storage. Since no milling activities are contemplated 
on the Daneros Project, no areas are required for tailings storage, heap leach pads, or processing plant sites. 

Permitting 

The primary permits required for mining activities at the Daneros Project include a mine permit issued by UDOGM and a Plan of 
Operations ("PO") approved by the BLM under the NEPA review process. UEC submitted a Plan of Operations for the Daneros Mine 
in 2008 that proposed a seven-year life of mine with production of up to 100,000 tons of mineralized material within a 4.5 acre disturbed 
area footprint. In 2012, the BLM issued an EA based on the 2008 PO that was subject to public review and comment. Following 
approval of the PO, an appeal was filed by Uranium Watch and associated environmental interest groups. The appeal was denied by 
the Utah BLM State office, then appealed to the Department of Interior Board of Land Appeals ("IBLA"), and denied by IBLA in 
September of 2012. 

In early 2013, an amended PO and a Large Mine NOI were submitted to the BLM and UDOGM, respectively. The modified PO would 
allow production of up to 500,000 tons of mineralized material over a 20-year period and an expansion of the disturbed area footprint 
to 46 acres. An EA was issued for public comment in July 2016 and finalized by the BLM in late 2016. With the designation of the 
Bears Ears National Monument ("BENM") in December 2016, the BLM essentially suspended review while they considered if expanded 
mining operations, now adjacent to the  monument,  might adversely affect the  monument. In September 2017  an updated EA that 
determined there would be no new impacts to the monument was forwarded to BLM Washington for approval. Since then, the BENM 
boundaries were modified by Presidential Executive Order, and the Daneros mine would be at least 15 miles from the nearest boundary. 
The EA, FONSI and PO amendment were issued by BLM on February 23, 2018. The Company expects approval of the NOI amendment 
later in 2018. 

Daneros was initially permitted by the UDOGM under a Small Mine Permit approved in 2009. The Notice of Intent ("NOI") for a 
Large Mining permit was submitted to UDOGM in early 2013. In 2015 UDOGM concluded its technical and administrative reviews 
of the application. Approval of the NOI has been pending BLM approval of the EAand Decision Notice, which were issued on February 
23, 2018, subject to certain specified requirements. As a result, the Company expects UDOGM approval of the modified PO and Large 
Mine permit within three to six months from the date of this Form 10-K. 

102 

 
 
Geological Setting 

Major uranium deposits of the east-central Colorado Plateau district occur principally in two fluvial sandstone sequences. The older 
is located at or near the base of the Upper Triassic Chinle Formation and the other occurs in the Late Jurassic Salt Wash Member of 
the Morrison Formation. The main uranium-bearing unit at the Daneros Project and throughout the White Canyon district is the fluvial 
Shinarump Member, a basal, sandstone-conglomerate sequence deposited in a complex stream system, which unconformably overlies 
and locally scours into oxidized sedimentary units of the Moenkopi Formation. 

The  Shinarump  Member  consists  of  predominantly  trough-crossbedded,  coarse-grained  sandstone  and  minor  gray,  carbonaceous 
mudstone and is interpreted as a valley-fill sequence overlain by deposits of a braided stream system. Uranium mineralization appears 
to be related to low-energy depositional environments in that uranium is localized in fluvial sandstones that lie beneath organic-rich 
lacustrine-marsh mudstones and carbonaceous delta-front sediments. The reducing environment preserved in these facies played an 
important role in the localization of uranium. 

Uranium deposits consist of closely-spaced, lenticular mineralized pods which are generally concordant with bedding in paleochannel 
sediments. Single mineralized pods range from a few feet to a few hundred feet in length and from less than one to more than 10 feet 
in thickness. Deposits range in size from a few tons to more than 600,000 tons. The Shinarump deposits generally have low vanadium 
content, and are therefore not processed for vanadium recovery. 

The uranium deposit at the Daneros Project, like nearly all others in the White Canyon district, is in the lower part of the Shinarump, 
especially  where it has scoured into the Moenkopi. The lithology, facies,  sedimentary  structures, and locations  within  the channel 
deposits all were important in controlling the migration of fluids and localization of the deposits. Coarser-grained rock is more favorable 
than fine-grained sand or silt units. Most of the uranium mineralization is overlying impermeable siltstones of the Moenkopi or local 
siltstone lenses internal of the Shinarump. The lateral edges of channels where they are bounded by mudstones are also favorable 
locations for mineralization. Historical production from the White Canyon District exceeds 11 million pounds of U3O8. 

History 

The White Canyon mining district has a long history of exploration and mining. From 1949-1987 production from the district was 
2,259,822 tons at an average grade of 0.24% U3O8 for a total of 11,069,032 pounds placing it second, behind Lisbon Valley, for uranium 
production from the Chinle Formation on the Colorado Plateau. 

Exploration  for  uranium  has  been  going  on  in  the White  Canyon  area  since  the  late  1940’s.  Prospectors  used  Geiger  counters  to 
investigate outcrops of the Shinarump Sandstone. The history of exploration is closely tied to the Atomic Energy Commission (“AEC”) 
buying program, opening and closing of the several processing facilities in the region, and the fluctuation of the price of uranium. 

The properties in the Daneros Project area remained idle until 1946. From 1948 until 1951, White Canyon and the nearby Red Canyon 
and Deer Flat areas were subject to intense exploration. The AEC ore procurement program ended on December 31, 1970, and during 
the early 1970’s minimal production was recorded from the district. 

Production  from  the  district  increased  again  by  1974  when  the  demand  for  uranium  increased  due  to  nuclear  power  generation. 
Exploration and production once again increased in the White Canyon District. In 1974, Utah Power and Light Company (“UP&L”) 
began to acquire properties in the White Canyon district, which included a 100% interest in the Spook-Bullseye property and a 60% 
interest in the Lark-Royal property both located near the Daneros Project in Red Canyon. 

Between 1975 and 1985, UP&L conducted several phases of drilling leading to definition of the Lark, Royal, and Bullseye deposits 
near the modern day Daneros Project. UP&L drilled 595 diamond drill holes with an average depth of 510 feet and, following industry 
standard  procedures,  logged  all  holes  using  down-hole  geophysical  (gamma)  probes  to  identify  radioactive  horizons. Anomalous 
horizons were sampled and analyzed for uranium. 

UP&L never started mining activities in the White Canyon district, due to the collapse of the uranium price by 1982. By 1987 the last 
mines in the White Canyon district closed due to declining economics, socio-political factors and competition from lower cost producers. 
Following 1987, the properties were idle and little or no exploration activity took place in the White Canyon district. 

In 1993 UP&L dropped its mining claims in the White Canyon District. In October 1993, Eugene and Merwin Shumway staked the 
Daneros claims that covered the deposits UP&L had discovered. Eugene and Merwin Shumway quitclaimed their claims to Wilene 
and Mike Shumway, Terry Leach, and James Lammert in March, 1994. No exploration or development took place between 1994 and 
2005. From 2005 to 2007, these individuals began acquiring properties with known historic mineral deposits in the White Canyon 
district. 

In 2007, Utah Commodities Pty, Ltd. who later changed its name to White Canyon Uranium Limited (“WCUL”), which operated in 
the United States through its wholly owned subsidiary, UEC, acquired a 100% interest in the Daneros claims from those individuals. 

103 

 
In December 2008, WCUL purchased 33 additional claims, known as the Lark-Royal Project, an extension of the Daneros Project, 
from Uranium One. 

WCUL began drilling programs in Bullseye Canyon during 2007. The first program drilled 8 holes within the five Daneros claims. A 
second program in 2008 drilled 16 diamond drill holes and 1 rotary drill hole. Finally, a third program, also in 2008, drilled 11 diamond 
drill holes and 9 rotary drill holes. The success of this drilling provided the basis for mineral resource estimates relied upon by WCUL 
to commence mining activities at the Daneros Project. 

The Daneros Project was constructed and uranium bearing material was extracted by WCUL, through its subsidiary UEC. WCUL 
gathered the necessary environmental data and submitted applications for approvals to open an underground facility at Daneros. A PO 
was submitted to the BLM and was approved in May, 2009, following which UEC commenced active construction at the project, 
including driving a decline into the main deposit at Daneros. The first loads of mineralized material from the Daneros Project were 
delivered to the White Mesa Mill in December, 2009, then operated by Denison Mines. In January 2010, Denison entered into a toll 
milling agreement with UEC, which was then a wholly-owned subsidiary of WCUL. 

In 2011, Denison acquired all of the issued and outstanding shares of WCUL, including all of the shares of UEC. In June 2012, Energy 
Fuels acquired all of the issued and outstanding shares of WCUL as part of its acquisition of the U.S. Mining Division from Denison, 
which included the Daneros Project and all of the shares of UEC (which is now named EFR White Canyon Corp.). Denison, and then 
the Company, kept the project in operation using the same contractors (until placing it on standby in October 2012 after the Daneros 
Project Technical Report was written). During the 2009 to 2013 time period, 121,000 tons of mineralized material were mined at the 
Daneros Mine and processed at the White Mesa Mill. This material had an average grade of 0.26% U3O8 and contained 629,000 pounds 
of uranium. 

Mineralization 

Uraninite (pitchblende) is by far the dominant primary uranium mineral in the Shinarump deposits. It occurs as distinct grains, fine- 
grained coatings on and pore-fillings between detrital quartz grains, partial replacement  of feldspar  grains, and as replacement in 
carbonized wood and other remains of organic matter. Metallic sulfide minerals are often abundant. Where secondary oxidation has 
occurred, minor amounts of uranyl carbonates, sulfates, and phosphates are found. The source of the uranium is not well established. 
Overlying shaley units of the Chinle contain clays derived from volcanic ash that is uraniferous. The source area of the arkosic sediments 
was also a uranium-rich province. 

Daneros Mineral Resources – Uranium(1)(2)(3)(4)(5)

Classification 

Daneros Measured Resources (M) 

Daneros Indicated Resources (I) 

Daneros Total (M & I) 

Daneros Inferred Resources 

Notes: 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

--- 

20 

20 

7 

--- 

0.36% 

0.36% 

0.37% 

--- 

142 

142 

52 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium cut-off grade of 0.23% eU3O8. 
(3)  Mineral Resources are estimated using a long-term uranium price of US$55 per pound. 
(4)  Numbers may not add due to rounding. 
(5)  This Mineral Resource accounts for all material mined through October 2012, when Daneros was placed on Standby. 

Additional Historical Resources 

The Daneros property contains three historical mines, which produced in the early days of mining in the White Canyon District. These 
mines are the Lark/Bullseye, the Royal and the Spook. An historical resource estimate for the Lark mine was completed by UP&L in 
1974. UP&L estimated that the Lark mine contained approximately 45,000 tons at a grade of 0.30% U3O8  for 265,000 pounds of 
uranium. This historical resource estimate is based on both surface and underground long-hole drilling. Areas of influence are defined 
by connecting surface holes that are less than 100 ft. apart and to the mineralized extent of a long hole. 

104 

 
 
 
 
 
 
 
 
Peters Geosciences and the Company do not consider this historical resource estimate to be current mineral resources or reserves as 
defined under NI 43-101. Energy Fuels has only reviewed a limited number of data in connection with this historical estimate. Readers 
should be cautioned that a qualified person has not done sufficient work to classify this historical estimate as a current estimate of 
mineral resources or mineral reserves in accordance with NI 43-101.  This historical resource estimate was classified as "Indicated 
Resources." However, this category was applied without using applicable mining standards and economics, and should not be considered 
reserves by industry definition.  The Company believes this historical estimate is relevant and reliable, as the methodology was well 
documented and utilized industry standard practice.  However, the methodologies used do not reflect current best industry practices. 
The Company does not consider these historical estimates to be equivalent to current mineral resources or mineral reserves as defined 
in NI 43-101, nor has the Company completed sufficient work to confirm a NI 43-101 compliant resource.  Therefore, the historical 
estimates cannot, and should not, be relied upon as NI 43-101 resources or reserves. 

Present Condition of Property and Work Completed to Date 

The Daneros Project is fully permitted and constructed. The facilities consist of a modular trailer for the project office, two reinforced 
portals for access to and from the underground workings, a generator building, and an equipment storage and maintenance building. 
The deposit is accessed from the surface through a 450 foot long decline at a gradient of -15%. Two ventilation shafts daylight on the 
topographic bench above the underground workings. 

The Daneros Project was acquired by the Company in June 2012, through the acquisition of the Denison US Mining Division. The 
cost of the Daneros Project has been fully impaired, and as of December 31, 2017, the total cost attributable to the Daneros Project 
and its associated equipment on the financial statements of the Company was nil. 

The Company’s Planned Work 

We  are  maintaining  the  project  on  care  and  maintenance. Additional  permitting  is  ongoing  as  described  above.  Energy  Fuels  has 
reviewed the remaining resources and has evaluated prospective areas for future exploration drilling. There are no plans to perform 
any drilling in 2018. 

105 

 
 
 
 
 
Non-Material Mineral Properties 

This section describes certain non-material mineral properties held by the Company. As these projects are not considered material to 
the Company's business, the Company may choose to pursue or to take under consideration the potential sale, joint venture, trade or 
other transaction involving one or more of these projects. 

We hold the following non-material mineral properties: 

Other ISR Projects 

The Company's Properties located in the Powder River Basin, Wyoming, are as follows: 

Our properties in the Powder River Basin of Wyoming, but outside of the Nichols Ranch Project, include 12,480 acres owned 100% 
by the Company through its wholly owned subsidiary, Uranerz. These properties include: the North Rolling Pin Property, the Reno 
Creek Property, the West North Butte Property, and the Collins Draw, Willow Creek, East Nichols, North Nichols, Verna Ann, and 
Niles Ranch properties. The Company, through Uranerz, also holds an 81% interest in the Arkose Joint Venture, which holds an additional 
42,952 acres in the Powder River Basin. 

In general, these ISR projects are located in basins containing sandstones of Tertiary age with known uranium mineralization. Limited 
exploration was conducted by Uranerz on each project except for Verna Ann and Niles Ranch. 

The Reno Creek Property consists of three unpatented lode mining claims, 18 mineral leases, and three surface use agreements. The 
project area covers approximately 1,332.57 acres. The fee land in the project is covered by mineral leases, some of which have annual 
payments and some of which are paid up leases. The mineral leases have primary terms of 10 years and can be held by production (as 
defined in the leases). Some of the mineral leases will expire in 2018 and 2019; however the leases generally enable the Company to 

106 

 
 
 
 
 
 
 
 
 
 
extend the term of such leases, which the Company has done or intends to do. The fee surface is covered by three Surface Use Agreements, 
which include damage payments paid on an annual basis. Sixteen of the mining leases have a two-tier royalty based on the price of 
U3O8  at the time of sale, which is 6% for a U3O8   price less than $45.00 per pound or 8% for a U3O8  price equal to or greater than 
$45.00 per pound. Two of these leases have a flat 8% of the total gross proceeds. Access to the project is off of Highway 387, which 
runs through the northern end of the project area. A technical report titled “Technical Report, Reno Creek Property, Campbell County, 
Wyoming, U.S.A.” dated October 13, 2010, was prepared by Douglass Graves, P.E. of Trec, Inc., in accordance with NI 43-101 (the 
“Reno Creek Technical Report”). Mr. Graves is a “qualified person” and “independent” of the Company within the meaning of NI 
43-101. The Reno Creek Technical Report is available on SEDAR at www.sedar.com. The Reno Creek Technical Report reports the 
following mineral resources calculated in accordance with NI 43-101. None of these resources are reserves within the meaning of SEC 
Industry Guide 7. In November 2017, the Company announced that it had entered into an agreement to sell the Reno Creek Property 
to Uranium Energy Corp. (see 2017 Corporate Developments, above). 

Reno Creek Mineral Resources - Uranium(1)(2)(3)(4)

Classification 

Reno Creek Measured Resources (M) 

Reno Creek Indicated Resources (I) 

Reno Creek Total (M & I) 

Reno Creek Inferred Resources 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

2,281 

0.061% 

1,550 

0.049% 

3,831 

0.056% 

190 

0.037% 

2,782 

1,511 

4,293 

142 

Notes: 
(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7.  Mineral resources that are not reserves do 
not have demonstrated economic viability.  See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off of 0.20 G.T. (minimum grade of 0.03% eU3O8 
or minimum thickness of 1 foot). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

Wholly-owned Powder River Basin ISR Mineral Resources 

Through its wholly owned subsidiary, Uranerz, the Company owns properties in the Powder River Basin of Wyoming, but outside of 
the Nichols Ranch Project, comprising a total of 19,801 acres. These properties include: the North Rolling Pin Property, the West North 
Butte Property, and the Collins Draw, Willow Creek, East Nichols, North Nichols, Verna Ann, and Niles Ranch properties. 

The North Rolling Pin property is discussed in the “Technical Report West North Butte Satellite Properties Campbell County, Wyoming, 
U.S.A.”, dated December 9, 2008, prepared by Douglas H. Graves of TREC, Inc. and Don R. Woody of Woody Enterprises and is 
available on SEDAR at www.sedar.com. Mr. Graves and Mr. Woody are “qualified persons” and are “independent” of the Company 
within the meaning of NI 43-101. The West North Butte satellite properties include West North Butte, East North Butte, and Willow 
Creek, and are described in the Technical Report titled “Technical Report North Rolling Pin Property Campbell County, Wyoming, 
U.S.A.” dated June 4, 2010, prepared by Douglas H. Graves of TREC, Inc. and is available on SEDAR at www.sedar.com. Mr. Graves 
is a “qualified person” and is “independent” of the Company within the meaning of NI 43-101. 

Except as noted, the following description of these properties is based on the foregoing technical reports. 

107 

 
 
 
 
 
 
 
 
 
 
 
 
Wholly-owned Powder River Basin ISR Mineral Resources(1)(2)(3)(4)

Classification 

Powder River Basin Measured Resources (M) 

Powder River Basin Indicated Resources (I) 

Total (M & I) 

Property 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

North Rolling Pin 

North Rolling Pin 

West North Butte 

310 

272 

926 

0.062 % 

0.051 % 

0.153 % 

1,508 

0.116% 

North Rolling Pin 

39 

0.042 % 

387 

278 

2,837 

3,502 

33 

2,682 

2,714 

Powder River Basin Inferred Resources 

West North Butte 

1,117 

0.120 % 

Total Inferred Resources 

Notes: 

1,156 

0.117% 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources are estimated at a uranium grade x thickness (G.T.) of 0.20 G.T. 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound U3O8. 
(4)  Numbers may not add due to rounding. 

Arkose Joint Venture, Powder River Basin, Wyoming: 

The Company, through its wholly owned subsidiary Uranerz, holds an undivided 81% interest in the Arkose Joint Venture, which holds 
an additional 46,748 acres in the Powder River Basin. Uranerz completed the acquisition of its interest in the Arkose Joint Venture 
mineral properties on January 15, 2008. This acquisition was completed pursuant to a purchase and sale agreement previously announced 
on September 19, 2007 between Uranerz, and NAMMCO, Steven C. Kirkwood, Robert W. Kirkwood and Stephen L. Payne (collectively, 
the “NAMMCO Sellers”). 

In connection with the acquisition of its interest in the Arkose Joint Venture, Uranerz entered into a venture agreement dated as of 
January 15, 2008  (the “Venture Agreement”) with United Nuclear,  LLC (“United Nuclear”), a limited liability company  wholly 
owned by the NAMMCO Sellers and their designee under the purchase and sale agreement. Under the Venture Agreement, United 
Nuclear will hold (and contribute to) its nineteen percent (19%) working interest in the Arkose Joint Venture, and Uranerz will operate 
and be the manager of the Venture. Uranerz and United Nuclear agreed to contribute funds to programs and budgets approved under 
the Arkose Mining Venture in accordance with their respective interests in the Venture. 

The Arkose Mining Venture includes the following property units on which Uranerz has conducted exploration: 

South Doughstick 

•  North Jane * 
• 
•  Cedar Canyon 
•  East Buck 
South Collins Draw 
• 
• 
Sand Rock 
•  Little Butte 
•  Beecher Draw 
•  Monument 
Stage 
• 

*Now included in the Nichols Ranch Project as part of the Jane Dough Property. 

Except as noted, the following description of the Arkose Joint Venture properties is based on a technical report titled “Arkose Uranium 
Project Mineral Resource and Exploration Target, 43-101 Technical Report” dated February 28, 2015, prepared by Douglas L. Beahm, 
P.E., P.G. of BRS Inc. in accordance with NI 43-101 (the “Arkose Technical Report”). Mr. Beahm is a “qualified person” and is 

108 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
“independent”  of  the  Company  within  the  meaning  of  NI  43-101.  The  Arkose  Technical  Report  is  available  on  SEDAR  at 
www.sedar.com. 

In September of 2016 the Arkose Joint Venture elected to forfeit 190 unpatented lode mining claims covering 3,925 acres from its 
Kermit property and 144 claims covering 2,975 acres from its Lone Bull property, which constitute all of the Arkose claims in those 
projects. In addition, four mineral leases comprising 592 acres in the East Buck project were allowed to expire in 2016 without attempting 
to negotiate extensions to those leases. In 2017, several mineral leases in the Monument, Cedar Canyon, Sand Rock, East Buck and 
House Creek projects were allowed to expire; however, the Company does not expect the expiry of those property interests to materially 
affect our ability to continue exploration and extraction activities on our properties. 

The Arkose Joint Venture properties are comprised of unpatented lode mining claims, state leases and fee (private) mineral leases, 
summarized as follows as of December 31, 2017: 

Property Composition 

Unpatented Lode Mining Claims 

State Leases 

Fee (private) Mineral Leases 

TOTAL 

Notes: 

(1)  Subject to royalties. 

Ownership 
Interest(1)

Number of 
Claims/Leases 

Acreage 
(Approximate) 

81% 

81% 

81% 

1,338 

3 

54 

1,395 

26,523 

2,080 

10,498 

39,101 

Arkose JV-owned Powder River Basin ISR Mineral Resources 

Classification 

Property 

Tons (000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

Energy Fuels 
Pounds 
eU3O8 (000)(5)

Arkose JV Measured Resources (M) 

Arkose JV Indicated Resources (I) 

--- 

--- 

Total (M & I) 

East Buck 

Little Butte 

Sand Rock 

Arkose JV Inferred Resources 

South Doughstick 

Total Inferred Resources 

Notes: 

--- 

--- 

--- 

--- 

--- 

--- 

656 

0.110% 

1,021 

0.090% 

184 

197 

0.100% 

0.130% 

--- 

--- 

--- 

1.436 

1.752 

381 

497 

2,058 

0.099% 

4,066 

--- 

--- 

--- 

1,163 

1,419 

309 

402 

3,293 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources for the Arkose JV are estimated at a uranium grade x thickness (G.T.) cut-off of 0.20 G.T. (minimum grade 
of 0.02% eU3O8). 
(3)  Mineral Resources are estimated using a long-term uranium price of US$65 per pound. 
(4)  Numbers may not add due to rounding. 
(5)  “Energy Fuels Pounds” represent the 81% Company share of the Arkose Mining Venture properties. 

109 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Arizona Strip 

Other Conventional Projects 

The  Pinenut  Project  is  currently  in  reclamation.  Mineral  extraction  at  our Arizona  1  Project  commenced  in  December  2009,  and 
continued until the project was placed on standby in February 2014 due to the depletion of the readily available resources. The Wate 
Project and EZ Project are in the evaluation stage. Permitting at the Wate Project and the EZ Project is currently on hold.  A description 
of the Wate Project can be found in the NI 43-101 report titled “NI 43-101 Technical Report on Resources Wate Uranium Breccia Pipe- 
Northern Arizona, USA” dated March 10, 2015, prepared by Allan Moran and Frank A. Daviess of SRK Consulting (U.S.) Inc. and 
available on www.sedar.com and on EDGAR at www.sec.gov. The EZ Project is described in the technical report titled “Technical 
Report  on  the  EZ1  and  EZ2  Breccia  Pipes, Arizona  Strip  District,  U.S.A.”  dated  June  27,  2012,  prepared  by  David A.  Ross  and 
Christopher Moreton of Roscoe Postle Associates and available on www.sedar.com and on EDGAR at www.sec.gov. 

Other Arizona Strip Properties Mineral Resources – Uranium(1)(4)(5)

Classification 

Arizona Strip Measured Resources (M) 

Arizona Strip Indicated Resources (I) 

Total (M & I) 

Arizona Strip Inferred Resources 

Total Inferred Resources 

Property 

--- 

--- 

Wate(2)

EZ1 and EZ2(3)

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

--- 

--- 

--- 

71 

224 

295 

--- 

--- 

--- 

0.79 % 

0.47 % 

0.55% 

--- 

--- 

--- 

1,118 

2,105 

3,223 

110 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Notes: 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources for Wate are estimated at a uranium cut-off grade of 0.15% eU3O8 and for EZ1 and EZ2 are estimated at 
a uranium cut-off grade of 0.20% eU3O8. 
(3)  Mineral Resources for Wate are estimated using a long-term uranium price of US$38 per pound U3O8, and for EZ1 and EZ2 
are estimated using a long-term uranium price of US$53 per pound U3O8. 
(4)  The Mineral Resources do not include any remaining resources for Arizona 1, because those given in the “Technical Report 
on the Arizona Strip Uranium Project, Arizona, U.S.A.” dated June 27, 2012 do not adequately address changes to the resource as 
a result of mining and the addition of potential additional mineralization as a result of underground drilling associated with mining 
activities. 
(5)  Numbers may not add due to rounding. 

Colorado Plateau 

As a result of declining uranium prices, the Rim property (the “Rim Property”) was placed on standby in March 2009, by the previous 
operator, Denison. It is maintained so that it can be restarted with little relative effort or development costs. The Rim Property is located 
15 miles northeast of Monticello, Utah in San Juan County. The property consists of 26 unpatented lode mining claims, a private lease, 
and a Utah State Mineral Lease totaling about 1,100 acres. No exploration is planned for 2018. 

The Whirlwind Project comprises 126 unpatented lode mining claims covered by three Mineral Leases and a Utah State Mineral Lease 
of 320 acres for a total acreage of about 2,800 acres. The property size (as reported in the NI 43-101 report “Updated Technical Report 
on Energy Fuels Resources Corporation’s Whirlwind Property (Including Whirlwind, Far West, and Crosswind Claim Groups and 
Utah Metalliferous Minerals Lease ML-49312) Mesa County, Colorado and Grand County, Utah,” dated March 15, 2011, prepared 
by Douglas C. Peters of Peters Geosciences, and available on www.sedar.com) has been reduced since the acquisition. The retained 
property continues to cover the known mineralized areas that are described in the Technical Report. The Whirlwind Project straddles 
the Utah/Colorado state line 4.5 miles southwest of Gateway, Colorado. The Whirlwind Project was refurbished by the Company in 
2008, and remains on standby status. Exploration drill projects were conducted in 2007, 2008, 2009, 2010, 2011 and 2012. No exploration 
is planned for 2018. 

The Sage Plain Project is a uranium/vanadium property in the evaluation stage. It is located in southeast Utah about 15 miles northeast 
of Monticello, Utah in the southwest continuation of the Uravan Mineral Belt. The project area includes one historic property, the 
Calliham Mine, which was operated by Atlas Minerals in the 1980s and briefly by Umetco Minerals Corp. in the early 1990’s. Calliham 

111 

 
 
 
 
 
 
ceased production due to low uranium prices. It consists of two fee mineral leases covering about 960 acres (Calliham and Crain) and 
a Utah State lease of 640 acres. A third fee mineral lease (Skidmore) has been terminated since the preparation of the Technical Report 
"Updated Technical Report on Sage Plain Project (Including the Calliham Mine) San Juan County, Utah, U.S.A." dated March 18, 
2015, prepared by Douglas C. Peters of Peters Geosciences.  No exploration is planned for 2018. 

Other Colorado Plateau Properties Mineral Resources – Uranium and Vanadium(1)(5)

Classification 

Colorado Plateau Measured Resources (M) 

Colorado Plateau Indicated Resources (I) 

Total (M & I) 

Colorado Plateau Inferred Resources 

Total Inferred Resources 

Notes: 

Property 

Sage Plain(2)(4)

Sage Plain(2)(4)

Whirlwind(3)

Sage Plain(2)(4)

Whirlwind(3)

Tons 
(000) 

Grade 
% eU3O8 

Pounds 
eU3O8 (000) 

Grade 
% V2O5 

Pounds 
V2O5 (000) 

240 

13 

188 

441 

10 

437 

447 

0.16 % 

0.10 % 

772 

1.32 % 

6,350 

26 

0.77 % 

199 

0.29 % 

1,095 

0.96 % 

3,598 

0.21% 

1,894 

1.15% 

10,147 

0.13 % 

25 

0.94 % 

0.23 % 

2,000 

0.74 % 

0.23% 

2,025 

0.74% 

188 

6,472 

6,660 

(1)  The Mineral Resource estimate in this table complies with the requirements of NI 43-101, and the classifications comply with 
CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do 
not have demonstrated economic viability. See “Cautionary Note to U.S. Investors Concerning Disclosure of Mineral Resources,” 
above. 
(2)  Mineral Resources for Sage Plain are estimated at a uranium cut-off grade of 0.10% eU3O8. This cut-off grade is based on 
using a long-term uranium price of US$63 per pound U3O8  and a vanadium price of US$6.75 per pound V2O5.Where vanadium 
assay data is available, that information is used to estimate the vanadium Mineral Resource. Where assay data is not available an 
average V2O5:U3O8 ratio of 8.6:1 is used to estimate the vanadium Mineral Resource. 
(3)  Mineral Resources for Whirlwind are estimated at a uranium cut-off grade of 0.06% eU3O8.  This cut-off grade is based on 
using a long-term uranium price of US$77.50 per pound U3O8 and a vanadium price of US$7.50 per pound V2O5. Vanadium grades 
are based on assays where taken, and otherwise estimated at the average V2O5:U3O8 ratio of 3.24:1. 
(4)  The Mineral Resources given for Sage Plain differ from those given in the “Updated Technical Report on Sage Plain Project 
(Including the Calliham Mine), San Juan County, Utah, U.S.A.” dated March 18, 2015. The Skidmore Lease portion of the property 
was dropped in 2016 and that Mineral Resource has been subtracted from that shown in the table. 
(5)  Numbers may not add due to rounding. 

Department of Energy (DOE) Lease Tracts 

Exploration Properties 

We currently hold eight DOE uranium leases in the Uravan Mineral Belt portion of Mesa, Montrose, and San Miguel Counties, Colorado. 
The tracts are designated C-SR-12, C-SR-16A, C-AM-19, C-AM-20, C-CM-24, C-G-26, and C-G-27. A Federal Court Order in 2011 
halted all physical work on these tracts until the DOE completes a full EIS on its Uranium Leasing Program. The Final EIS was made 
available and the Record of Decision was published in the Federal Register on May 12, 2014. The DOE’s preferred alternative is to 
resume the leasing program essentially as it was before the law suit. However, the DOE has not yet petitioned the Court to remove the 
stay on the leases; therefore, we have no plans for any additional exploration work in 2018. Prior to the 2011 stay, we conducted drilling 
on CM-24 and G-26. 

The HC Claims (Calamity Mesa) and Torbyn Claims (Tenderfoot Mesa) were dropped by the Company during 2017. Neither property 
contained NI 43-101 compliant Mineral Resources. 

Dropped Properties 

112 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 3. LEGAL PROCEEDINGS 

Other than routine litigation incidental to our business, or as described below, the Company is not currently a party to any material 
pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, 
results of operations or cash flows. 

White Mesa Mill 

In November 2012, the Company was served with a Plaintiff’s Original Petition and Jury Demand in the District Court of Harris 
County, Texas, claiming unspecified damages from the disease and injuries resulting from mesothelioma from exposure to asbestos, 
which the Plaintiff claims was contributed to by being exposed to asbestos products and dust while working at the White Mesa 
Mill. The Company does not consider this claim to have any merit, and therefore does not believe it will materially affect our 
financial position, results of operations or cash flows. In January, 2013, the Company filed a Special Appearance challenging 
jurisdiction and certain other procedural matters relating to this claim. This action was dismissed on February 21, 2018 and the 
matter is now finished. 

In January, 2013, the Ute Mountain Ute tribe filed a Petition to Intervene and Request for Agency Action challenging the Corrective 
Action Plan approved by the State of Utah Department of Environmental Quality (“UDEQ”) relating to nitrate contamination in 
the shallow aquifer at the White Mesa Mill site. This challenge is currently being evaluated, and may involve the appointment of 
an administrative law judge to hear the matter. The Company does not consider this action to have any merit. If the petition is 
successful, the likely outcome would be a requirement to modify or replace the existing Corrective Action Plan. At this time, the 
Company does not believe any such modification or replacement would materially affect our financial position, results of operations 
or cash flows. However, the scope and costs of remediation under a revised or replacement Corrective Action Plan have not yet 
been determined and could be significant. 

In April 2014, the Grand Canyon Trust filed a citizen suit in federal District Court for alleged violations of the Clean Air Act at 
the White Mesa Mill. In October 2014, the plaintiffs were granted leave by the Court to add further purported violations to their 
April  2014  suit. The  Complaint,  as  amended,  alleged  that  radon  from  one  of  the  Mill’s  tailings  impoundments  exceeded  the 
standard; that the mill is in violation of a requirement that only two tailings impoundments may be in operation at any one time; 
and  that  certain  other  violations  related  to  the  manner  of  measuring  and  reporting  radon  results  from  one  of  the  tailings 
impoundments occurred in 2013. The Complaint asked the Court to impose injunctive relief, civil penalties of up to $37,500 per 
day per violation, costs of litigation including attorneys’ fees, and other relief. The Company believes the issues raised in the 
Complaint are being addressed through the proper regulatory channels and that we are currently in compliance with all applicable 
regulatory requirements  relating  to those  matters.  Cross  motions  for  summary  judgment  were  heard  by the  District  Court  on 
November 17, 2016. On September 15, 2017, the Court issued its order in favor of the Company on all counts and dismissing the 
plaintiffs motions. This decision was not appealed by the plaintiffs, and the matter is now finished. 

Canyon Project 

In March, 2013, the Center for Biological Diversity, the Grand Canyon Trust, the Sierra Club and the Havasupai Tribe (the “Canyon 
Plaintiffs”)  filed  a  complaint  in  the  U.S.  District  Court  for  the  District  of Arizona  (the  “District  Court”)  against  the  Forest 
Supervisor for the Kaibab National Forest and the USFS seeking an order (a) declaring that the USFS failed to comply  with 
environmental, mining, public land, and historic preservation laws in relation to our Canyon Project, (b) setting aside any approvals 
regarding exploration and mining operations at the Canyon Project, and (c) directing operations to cease at the Canyon Project 
and enjoining the USFS from allowing any further exploration or mining-related activities at the Canyon Project until the USFS 
fully complies with all applicable laws. In April 2013, the Plaintiffs filed a Motion for Preliminary Injunction, which was denied 
by the District Court in September, 2013. On April 7, 2015, the District Court issued its final ruling on the merits in favor of the 
Defendants and the Company and against the Canyon Plaintiffs on all counts. The Canyon Plaintiffs appealed the District Court’s 
ruling on the merits to the Ninth Circuit Court of Appeals, and filed motions for an injunction pending appeal with the District 
Court. Those motions for an injunction pending appeal were denied by the District Court on May 26, 2015. Thereafter, Plaintiffs 
filed urgent motions for an injunction pending appeal with the Ninth Circuit Court of Appeals, which were denied on June 30, 
2015. The hearing on the merits at the Court of Appeals was held on December 15, 2016. On December 12, 2017, the Ninth Circuit 
Court of Appeals issued its ruling on the merits in favor of the Defendants and the Company and against the Canyon Plaintiffs on 
all counts. The Canyon Plaintiffs have petitioned the Ninth Circuit Court of Appeals for a rehearing en banc. On February 21, 
2018, the Court of Appeals ordered the Defendants and the Company to file a response to the Canyon Plaintiffs' petition for a 
rehearing en banc. If a rehearing is granted and the Canyon Plaintiffs are successful on their appeal on the merits, the Company 
may be required to maintain the Canyon Project on standby pending resolution of the matter. Such a required prolonged stoppage 
of shaft sinking and mining activities could have a significant impact on our future operations. 

113 

 
The mine safety disclosures required by section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and 
Item 104 of Regulation S-K are included in Exhibit 95.1 of this Annual Report. 

ITEM 4. MINE SAFETY DISCLOSURE 

114 

 
PART II 

ITEM 5. MARKET FOR THE REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER 

MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES 

Market Information 

Energy Fuels’ Common Shares are listed and traded on the NYSE American under the symbol “UUUU” and on the TSX under 
the symbol “EFR.” The following table sets forth, for the calendar quarters indicated, the high and low sales price per common 
share of Energy Fuels, in each case as reported on the NYSE American and the TSX. In addition, the table sets forth the quarterly 
cash dividends per share declared by Energy Fuels with respect to its Common Shares. 

Energy Fuels NYSE American 

(US Dollars) 

Energy Fuels TSX 

(Canadian Dollars) 

High 

Lo w 

Declared 

High 

Lo w 

Declared 

Dividends 

Dividends 

$ 

$ 

$ 

$ 

$ 

$ 

$ 

$ 

2.66  $ 

2.25  $ 

1.85  $ 

2.03  $ 

2.96  $ 

2.70  $ 

2.56  $ 

2.37  $ 

1.73  $ 

1.48  $ 

1.58  $ 

1.30  $ 

1.96  $ 

2.10  $ 

1.51  $ 

1.30  $ 

—  $ 

—  $ 

—  $ 

—  $ 

—  $ 

—  $ 

—  $ 

—  $ 

3.47  $ 

3.00  $ 

2.33  $ 

2.64  $ 

4.04  $ 

3.46  $ 

3.28  $ 

2.40  $ 

2.32  $ 

1.98  $ 

1.99  $ 

1.66  $ 

2.83  $ 

2.73  $ 

2.01  $ 

1.76  $ 

— 

— 

— 

— 

— 

— 

— 

— 

2017 

First Quarter 

Second Quarter 

Third Quarter 

Fourth Quarter 

2016 

First Quarter 

Second Quarter 

Third Quarter 

Fourth Quarter 

As of March 8, 2018, the closing bid quotation for our Common Shares was $1.58 per share as quoted by the NYSE American. 

As of March 8, 2018, Energy Fuels had 75,739,978  Common Shares issued and outstanding, held by approximately  50,000 
shareholders. Most shares are registered through intermediaries, making the precise number of shareholders difficult to obtain. 

Dividend Policy 

We have never declared cash dividends on our common shares. We anticipate that we will retain any earnings to support operations 
and to finance the growth of our business. Therefore, we do not expect to pay cash dividends in the foreseeable future. Any further 
determination to pay cash dividends will be at the discretion of our Board of Directors and will be dependent on the financial 
condition, operating results, capital requirements, and other factors that our Board of Directors deems relevant. 

Recent Sales of Unregistered Securities 

None. 

Use of Proceeds 

None. 

Repurchase of Securities 

During 2017, neither we nor any of our affiliates repurchased any of our Common Shares registered under Section 12 of the 
Exchange Act. 

115 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Equity Compensation Plan Information 

The following table provides information as of December 31, 2017, concerning stock options and restricted stock units (“RSU’s”) 
outstanding pursuant to our 2015 Omnibus Equity Incentive Compensation Plan (the “Equity Incentive Plan”), which has been 
approved by the Company’s shareholders. Energy Fuels does not have an equity compensation plan that has not been approved 
by shareholders. The table also includes options that we assumed as part of the Uranerz acquisition. 

Number of Common 
Shares 
to be issued upon 
exercise 
of outstanding 
options, warrants 
and rights 
3,159,945 

Weighted-average 
exercise price of 
outstanding 
options, warrants 
and rights (USD) 
$3.63 

Number of Common Shares 
remaining available for 
future 
issuance 
4,276,738 

778,379 

3,938,324 

$5.84 

$5.80 

Nil 

4,276,738 

Plan Category 
Energy Fuels Omnibus 
Equity Incentive 
Compensation Plan (1) 
(2) 
Uranerz Replacement 
Options 
Total (1)(2) 

Notes: 

(1) Includes 1,250,468 stock options and 1,909,477 restricted stock units. Each restricted stock unit vests as to 50% one 
year after the date of grant, as to another 25% two years after the date of grant and as to the remaining 25% three years 
after the date of grant. Upon vesting, each restricted stock unit entitles the holder to receive one common share without any 
additional payment. 
(2) 1,909,477 restricted stock units have been excluded from the weighted average exercise price because there is no exercise 
price. 

Energy Fuels Equity Incentive Plan 

The Equity Incentive Plan was approved by the board of directors on January 28, 2015 and by shareholders on June 18, 2015. The 
Equity Incentive Plan supersedes and replaces the Energy Fuels Stock Option Plan, which was the Company’s prior equity incentive 
program. All stock options previously  granted pursuant to the Energy Fuels Stock Option Plan which remain outstanding are 
incorporated into the Equity Incentive Plan. Employees, directors, and consultants of the Company and its affiliates are eligible 
to participate in the Equity Incentive Plan. The Board of Directors, or a Committee authorized by the Board of Directors (the 
“Committee”), administers the Equity Incentive Plan. The Committee may grant awards for non-qualified stock options, incentive 
stock  options,  stock  appreciation  rights,  restricted  stock,  deferred  share  units,  restricted  stock  units,  performance  shares, 
performance units, and stock-based awards to eligible participants. The ability to grant a broad range of equity incentive awards 
is consistent with the practices of similar public companies. Pursuant to the rules of the TSX, the Equity Incentive Plan must be 
renewed by approval of Energy Fuels shareholders every three years. 

Uranerz Options 

On June 18, 2015, in connection with the acquisition of Uranerz, Energy Fuels issued 2,048,000 stock options of Energy Fuels, 
by assuming the then-existing options granted pursuant to the Uranerz 2005 Stock Option Plan, as amended on June 10, 2009 (the 
“2005 Stock Option Plan”). These options are now exercisable for Common Shares, subject to the exchange ratio set out in the 
Merger Agreement that governed the acquisition of Uranerz. No further stock options will be granted pursuant to the 2005 Stock 
Option Plan. The options have varying expiry dates with the last options expiring in June 2025. 

Stock Performance Graph 

The performance graph below shows Energy Fuels’ cumulative total 5-year return based on an initial investment of $100 in Energy 
Fuels common shares beginning on December 31, 2012, as compared  with the  Russell 2000  Index, NYSE American Natural 
Resources Index, NYSE Composite, NASDAQ Composite, and a peer group consisting of Ur-Energy, Peninsula Energy, Berkeley 
Energia, Toro Energy, Uranium Energy Corp., Paladin Energy, UEX Corp., Denison Mines Corp., URI, and Energy Resources of 
Australia. The chart shows yearly performance marks over a five year period. This performance chart assumes: (1) $100 was 
invested on December 31, 2012 in Energy Fuels common shares along with the Russell 2000 Index, NYSE American Natural 
Resources Index, NYSE Composite, NASDAQ Composite, and the peer group’s common stock; and (2) all dividends are reinvested. 
Dates on the chart represent the last trading day of the indicated fiscal year. 

116 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exchange Controls 

There are no governmental laws, decrees or regulations in Canada that restrict the export or import of capital, including foreign 
exchange controls, or that affect the remittance of dividends, interest or other payments to nonresident holders of the securities of 
Energy Fuels, other than Canadian withholding tax. See “Certain Canadian Federal Income Tax Considerations for U.S. Residents” 
below. 

Certain Canadian Federal Income Tax Considerations 

The following is, as of the date hereof, a summary of the principal Canadian federal income tax considerations generally applicable 
under the Income Tax Act (Canada) and the regulations promulgated thereunder (the "Tax Act") to a holder who acquires, as 
beneficial owner, our Common Shares, and who, for purposes of the Tax Act and at all relevant times: (i) holds the Common 
Shares as capital property; (ii) deals at arm’s length with, and is not affiliated with, us; (iii) is not, and is not deemed to be resident 
in Canada; and (iv) does not use or hold and will not be deemed to use or hold, our Common Shares in a business carried on in 
Canada, or a Non-Resident Holder. Generally, our Common Shares will be considered to be capital property to a Non-Resident 
Holder provided the Non-Resident Holder does not hold our Common Shares in the course of carrying on a business of trading 
or dealing in securities and has not acquired them in one or more transactions considered to be an adventure or concern in the 
nature of trade. Special rules, which are not discussed in this summary, may apply to a Non-Resident Holder that is an insurer that 
carries on an insurance business in Canada and elsewhere. Such Non-Resident Holders should seek advice from their own tax 
advisors. 

This summary is based upon the provisions of the Tax Act in force as of the date hereof, all specific proposals, or the Proposed 
Amendments, to amend the Tax Act that have been publicly and officially announced by or on behalf of the Minister of Finance 
(Canada) prior to the date hereof and management’s understanding of the current administrative policies and practices of the 
Canada Revenue Agency (the "CRA") published in writing by it prior to the date hereof. This summary assumes the Proposed 
Amendments will be enacted in the form proposed. However, no assurance can be given that the Proposed Amendments will be 
enacted in their current form, or at all. This summary is not exhaustive of all possible Canadian federal income tax considerations 
and, except for the Proposed Amendments, does not take into account or anticipate any changes in the law or any changes in the 
CRA’s administrative policies or practices, whether by legislative, governmental, or judicial action or decision, nor does it take 
into account or anticipate any other federal or any provincial, territorial or foreign tax considerations, which may differ significantly 
from those discussed herein. 

Non-Resident Holders should consult their own tax advisors with respect to an investment in our Common Shares. This 
summary is of a general nature only and is not intended to be, nor should it be construed to be, legal or tax advice to any 
prospective purchaser or holder of our Common Shares, and no representations with respect to the income tax consequences 
117 

 
 
 
 
to any prospective purchaser or holder are made. Consequently, prospective purchasers or holders of our Common Shares 
should consult their own tax advisors with respect to their particular circumstances. 

Currency Conversion 

Generally, for purposes of the Tax Act, all amounts relating to the acquisition, holding, or disposition of our Common Shares must 
be converted into Canadian dollars based on the exchange rates as determined in accordance with the Tax Act. The amounts subject 
to withholding tax and any capital gains or capital losses realized by a Non-Resident Holder may be affected by fluctuations in 
the Canadian-U.S. dollar exchange rate. 

Disposition of Common Shares 

A Non-Resident Holder will not generally be subject to tax under the Tax Act on a disposition of a common share, unless the 
common share constitutes “taxable Canadian property” (as defined in the Tax Act) of the Non-Resident Holder at the time of 
disposition and the Non-Resident Holder is not entitled to relief under an applicable income tax treaty or convention. 

Provided the common shares are listed on a “designated stock exchange”, as defined in the Tax Act (which currently includes the 
TSX and NYSE American) at the time of disposition, the common shares will generally not constitute taxable Canadian property 
of a Non-Resident Holder at that time, unless at any time during the 60-month period immediately preceding the disposition the 
following two conditions are satisfied concurrently: (i) (a) the Non-Resident Holder; (b) persons with whom the Non-Resident 
Holder did  not  deal  at  arm’s  length;  (c)  partnerships  in  which  the  Non-Resident  Holder or  a  person  described  in  (b)  holds  a 
membership interest directly or indirectly through one or more partnerships; or (d) any combination of the persons and partnerships 
described in (a) through (c), owned 25% or more of the issued shares of any class or series of our shares; and (ii) more than 50% 
of the fair market value of our shares was derived directly or indirectly from one or any combination of: real or immovable property 
situated in Canada, “Canadian resource properties”, “timber resource properties” (each as defined in the Tax Act), and options in 
respect of, or interests in or for civil law rights in, such properties. Notwithstanding the foregoing, in certain circumstances set 
out in the Tax Act, the common shares could be deemed to be taxable Canadian property. Even if the common shares are taxable 
Canadian  property  to  a  Non-Resident  Holder,  such  Non-Resident  Holder  may  be  exempt  from  tax  under  the Tax Act  on  the 
disposition  of  such  common  shares  by  virtue  of  an  applicable  income  tax  treaty  or  convention.  A  Non-Resident  Holder 
contemplating a disposition of Common Shares that may constitute taxable Canadian property should consult a tax advisor 
prior to such disposition. 

Receipt of Dividends 

Dividends received or deemed to be received by a Non-Resident Holder on our Common Shares will be subject to Canadian 
withholding tax under the Tax Act. The general rate of withholding tax is 25%, although such rate may be reduced under the 
provisions of an applicable income tax convention between Canada and the Non-Resident Holder’s country of residence. For 
example, under the Canada-United States Income Tax Convention (1980) as amended, or the Treaty, the rate is generally reduced 
to 15% where the Non-Resident Holder is a resident of the United States for the purposes of, and is entitled to the benefits of, the 
Treaty. 

ITEM 6. SELECTED FINANCIAL DATA 

Selected financial data about Energy Fuels for the last five years is set forth in the table below. You should read the data in the 
table in conjunction with the information contained in Item 7. “Management’s Discussion and Analysis of Financial Condition 
and Results of Operations” and the consolidated financial statements and related notes set forth in Item 8, “Financial Statements 
and Supplementary Data.” 

Total assets ($000s) 
Total long-term obligations ($000s) 

$ 
$ 

185,338  $ 
48,175  $ 

196,457  $ 
46,487  $ 

192,280  $ 
38,937  $ 

128,589  $ 
21,348  $ 

216,781 
26,539 

2017 

2016 

At December 31 
2015 

2014 

2013 

118 

 
 
 
 
 
 
 
 
 
 
Sales ($000s) 
Net loss ($000s) 

Basic and diluted loss per share 

$ 

$ 

Dividends per share 
Impairment of plant and equipment and mineral   
properties 
Impairment of assets held for sale 

$ 
$ 

Impairment losses on goodwill 

$ 

For the year ended December 31 

2017 

2016 

2015 

2014 

2013 

31,046  $ 
(27,990) $ 

54,552  $ 
(39,864) $ 

61,351  $ 
(82,357) $ 

46,253  $ 
(86,635) $ 

(0.39) $ 
Nil   

(0.70) $ 
Nil   

(2.46) $ 
Nil   

(4.41) $ 
Nil   

64,321 
(36,590) 

(2.27) 

Nil 

—  $ 
(3,799) $ 

—  $ 

—  $ 
—  $ 

—  $ 

(8,224) $ 
—  $ 

(47,730) $ 

(80,071) $ 
—  $ 

—  $ 

— 
— 

— 

Note: Over the five years shown above, the Company completed significant acquisitions of businesses and assets. See Item 1, 
"Description of Business; Development of the Business - Major Transactions over the Past Five Years" above. 

119 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF 
OPERATIONS 

The  following  discussion  and  analysis  should  be  read  in  conjunction  with  our  financial  statements  for  the  three  years  ended 
December 31, 2017 and the related notes thereto. This discussion and analysis contains forward-looking statements that involve 
risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking 
statements as a result of many factors, including, but not limited to, those set forth under the section heading “Item 1A. Risk 
Factors”  and  elsewhere  in  this  Annual  Report.  See  section  heading  “Cautionary  Statement  Regarding  Forward-Looking 
Statements.” 

Outlook 

Overview 

Operations and Sales Outlook Overview 

The Company plans to extract and/or recover uranium from the following sources in 2018 (each of which is more fully described 
below): 

•  Nichols Ranch Project 
•  Alternate Feed Materials 
• 

Pond Return at the White Mesa Mill 

Our planned operations, together with our existing inventories, are expected to produce finished uranium in excess of our existing 
sales contracts. 

In response to continued uranium price weakness and market uncertainty and, until such time that improvement in uranium market 
conditions is observed or suitable sales contracts can be entered into, the Company expects to defer further wellfield development 
at its Nichols Ranch Project. In addition, the Company will keep the Alta Mesa Project and its conventional mining properties 
on standby. The Company is also seeking new sources of revenue, including new sources of alternate feed materials and new fee 
processing opportunities at the White Mesa  Mill that can be processed under existing market conditions, largely unrelated to 
uranium sales prices, as well as evaluating the possibility of recovering vanadium from existing pond solutions at the White Mesa 
Mill. 

In addition, the Company is continuing to manage its activities and assets conservatively and maintaining its substantial uranium 
resource base and ISR and conventional uranium extraction and recovery capabilities. Shaft sinking at the Canyon Project has 
been completed and all field activities  will be completed by  mid-2018, with only engineering, procurement and construction 
management activities expected to continue through 2018. The Company will continue cost-cutting measures in 2018. 

The Company will also continue its support of the Trade Petition discussed below, and will evaluate additional acquisition and 
disposition opportunities that may arise. 

Extraction and Recovery Activities Overview 

The Company recovered approximately 1,570,000 pounds of U3O8 during the year ended December 31, 2017, of which 624,000 
pounds were for the account of the Company and the remainder were for the accounts of third parties under various alternate feed 
toll processing and other arrangements. The Company expects to produce 460,000 to 520,000 pounds of U3O8 in the year ending 
December 31, 2018 for its own account. 

The Company currently has finished goods inventory and uranium extraction and recovery capabilities that exceed the commitments 
contained in its existing sales contracts. As a result, both ISR and conventional uranium extraction and/or recovery have been, 
and are expected to continue to be, maintained at reduced levels until such time as market conditions improve sufficiently. 

ISR Activities 

We extracted and recovered approximately 259,000 pounds of U3O8 from Nichols Ranch for the year ended December 31, 2017. 
The Company expects to produce approximately 140,000 to 160,000 pounds of U3O8 in the year ending December 31, 2018 from 
Nichols Ranch. 

At December 31, 2017, the Nichols Ranch wellfields had nine header houses extracting uranium. Until such time that improvement 
in uranium market conditions is observed or suitable sales contracts can be entered into, the Company intends to defer development 
of further header houses at its Nichols Ranch Project and to keep the Alta Mesa Project on standby. 

120 

 
 
Permitting of the Jane Dough Property adjacent to the Nichols Ranch Project was completed in 2017, which is well in advance 
of our need to begin wellfield construction and production at that property. Also, the Hank Project is fully permitted to be constructed 
as a satellite facility to the Nichols Ranch Plant. 

Conventional Activities 

Conventional Extraction and Recovery Activities 

The White Mesa Mill recovered approximately 1,312,000 pounds of U3O8 during the year ended December 31, 2017, primarily 
from alternate feed materials and from dissolved uranium in the Mill’s tailings management system not recovered from previous 
processing activities (“Pond Return”). Of these 1,312,000 pounds of U3O8, 366,000 pounds were for the account of the Company 
and the remainder were for the accounts of third parties under various alternate feed toll processing and other arrangements. 

During the year ending December 31, 2018, the Company expects to recover approximately 320,000 to 360,000 pounds of U3O8 
at the White Mesa Mill for its own account. All of this uranium is expected to be from alternate feed materials and Pond Return. 
In addition, during 2018, the  Company expects to recover  additional uranium  for the accounts of third parties under  various 
alternate feed toll processing and other arrangements, returning all finished uranium product from those activities to the generators 
of the feed materials. The fees from those toll processing and other arrangements are expected to cover the Company's processing 
costs relating to those activities and to provide the Company with a reasonable margin. 

The White Mesa Mill has historically operated on a campaign basis, whereby uranium recovery is scheduled as mill feed, cash 
needs, contract requirements, and/or market conditions may warrant. The Company currently expects that planned processing 
activities will keep the Mill in operation through the end of 2018. The Company is also actively pursuing opportunities to process 
new  and  additional  alternate  feed  sources,  low  grade  ore  from  third  parties  in  connection  with  various  uranium  clean-up 
requirements, further recovery of Pond Return, and is also evaluating the possibility of recovering vanadium from existing pond 
solutions. Successful results from these activities would allow the Mill to extend the 2018 campaign into 2019 and beyond. 

However, in the event we are unable at any time to secure sufficient feed sources to justify full operation of the Mill through 2018 
or at any time thereafter, the Company would expect to place uranium recovery activities at the Mill on standby at that time, until 
sufficient mill feed becomes available. While on standby, the Mill would continue to dry and package material from the Nichols 
Ranch Plant and continue  to  receive  and stockpile  alternate feed  materials for  future  milling campaigns.  Each  future  milling 
campaign would be subject to receipt of sufficient mill feed and resulting cash flow that would allow the Company to operate the 
Mill on a profitable basis or that would result in all or a portion of the Mill's standby costs being recovered. 

Conventional Evaluation, Permitting and Standby Activities 

The Company has completed shaft sinking at the Canyon Project, along with underground drilling to further evaluate the deposit. 
On October 10, 2017, the Company filed an NI 43-101 report updating its resource estimate for the Canyon Project. The updated 
resource estimate significantly increased the pounds of uranium contained in the Canyon Project over previously reported estimates. 
It also upgraded a large portion of the resources from the inferred category to the measured and indicated categories, and quantified 
significant copper resources. The Company believes it has identified reasonable options for processing these copper resources at 
its White Mesa Mill as a by-product with uranium. If successful, the recovered copper would provide a credit that would effectively 
lower the U3O8 production cost per pound at the mine. 

During 2018, the Company plans to complete the construction of the main mine sump at the Canyon Project before mid-year 2018, 
after which time all field activities will have been completed. The Company plans to continue to carry out engineering, procurement 
and construction management activities in 2018, including additional bench and pilot plant scale metallurgical test work of the 
uranium/copper mineralization, as well as pursue any additional permitting actions that may be required to recover copper at the 
White Mesa Mill. The timing of our plans to extract and process mineralized materials from this project will be based on the results 
of this additional evaluation work, along with market conditions, available financing and sales requirements. 

The Company is selectively advancing certain permits at its other major conventional uranium projects. The Company plans to 
continue the licensing and permitting of the Roca Honda Project, a large, high-grade conventional project in New Mexico, with 
the Record of Decision currently now scheduled to be completed in 2019. The Company will also maintain required permits at 
the Company’s conventional standby projects including the La Sal Project and the Daneros Project. In January 2017, the Company 
obtained the necessary permits to mine the open pit and underground resources of its Sheep Mountain Project in Wyoming. The 
Company will also continue to evaluate the Bullfrog Property at its Henry Mountains Project. Expenditures for certain of these 
projects have been adjusted to coincide with expected dates of price recoveries based on our forecasts. All of these projects serve 
as important pipeline assets for the Company’s future conventional production capabilities, as market conditions warrant. A number 
of  the  Company’s  conventional  mines  also  have  substantial  vanadium  resources  which  the  Company  is  currently  evaluating, 
particularly with the recent increases in vanadium prices to over $13 per pound. 

121 

 
Cost Cutting Measures 

During 2017, the Company engaged in significant cost-cutting measures. We reduced our total number of employees from 195 in 
2016 to an estimated 108 for 2018, representing a reduction of approximately 45% since 2016. Further, since 2016, the Company 
has streamlined its executive management team, including recently announced management changes, by reducing the number of 
its  senior  executive  officers  from  six  to  three,  representing  a  reduction  of  50%,  and  a  significant  reduction  in  general  and 
administrative expenses. The Company has also significantly reduced its land holding costs, while maintaining its core properties 
and resource base. Since 2014, annual land holding costs have been reduced at our conventional properties by approximately 59% 
from $1.12 million in 2014 to $0.46 million in 2017, and since 2015 we have reduced expenditures related to our Wyoming ISR 
properties by approximately 43% from approximately $1.77 million in 2015 to $1.01 million in 2017. Finally, since the beginning 
of 2016, the Company has sold or entered into agreements to sell surplus equipment and other assets as well as non-core mineral 
properties for total proceeds to the Company of approximately $6.44 million. The Company will continue to pursue additional 
cost cutting initiatives, including further reductions in the scope of certain development initiatives, the potential sale or abandonment 
of certain non-core properties and the sale of excess mining equipment and other assets. 

Sales 

During the year ended December 31, 2017, the Company completed sales under its existing contracts of 520,000 pounds of U3O8, 
including 320,000 pounds under three long-term contracts and 200,000 pounds under a spot contract. Of these deliveries, 120,000 
pounds represent the final deliveries under one of these contracts. 

The Company has four remaining contracts, which require deliveries of 650,000 pounds of U3O8 in 2018. Of the 650,000 pounds 
of expected sales in 2018, 400,000 pounds are being sold pursuant to two long-term contracts with a fixed price of $61.30 per 
pound, 50,000 pounds are being sold pursuant to a contract having a fixed price of $24.75 per pound, and 200,000 pounds are 
being sold at a 0.5% discount to spot prices in effect at the times of delivery. Of the long-term contract deliveries, the 400,000 
pounds to be delivered in 2018 represent the final deliveries under all sales contracts. The Company expects to have sufficient 
existing inventory or uranium recovery to meet all of its commitments to sell these 650,000 pounds of uranium in 2018. 

The Company is monitoring market conditions for additional sales opportunities, as it currently has no further contracts for the 
sale of uranium following its 2018 deliveries. Selective additional spot sales may be made in 2018 as necessary to generate cash 
for operations and development activities. 

The Company also continues to pursue new sources of revenue, including additional alternate feed materials and other sources of 
feed for the White Mesa Mill. 

Trade Petition 

In January 2018, the Company participated in the filing of a Petition for Relief with the U.S. Department of Commerce under 
Section 232 of the Trade Expansion Act of 1962 (as amended) From Imports of Uranium Products that Threaten U.S. National 
Security.  The  Petition  describes  how  uranium  and  nuclear  fuel  from  state-owned  and  state-subsidized  enterprises  in  Russia, 
Kazakhstan, Uzbekistan, and China potentially represent a threat to U.S. national security. The Petition seeks a remedy which will 
set a quota to limit imports of uranium into the U.S., effectively reserving 25% of the  U.S. nuclear  market for U.S. uranium 
production. Additionally, the Petition suggests implementation of a requirement for U.S. federal utilities and agencies to buy U.S. 
uranium in accordance with the President's Buy American Policy. The remedies, if granted, would be expected to strengthen the 
U.S. uranium mining industry, bolster national defense, and improve supply diversification for U.S. utilities and their customers. 
The Company intends to continue its support of this action during 2018. It should be noted, however, that there can be no certainty 
of the outcome of the petition, and therefore the outcome of this process is uncertain. 

Results of Operations 

The following table summarizes the results of operations for the years ended December 31, 2017, 2016 and 2015 (in thousands 
of dollars): 

122 

 
 
 
Revenues 

Uranium concentrates 
Alternate feed materials processing and other 

Total revenues 

Costs and expenses applicable to revenue 

Costs and expenses applicable to uranium concentrates 

Costs and expenses applicable to alternate feed materials and other 

Total costs and expenses applicable to revenue 

Impairment of inventories 

Gross Profit 

Other operating costs and expenses 

Development, permitting and land holding 
Standby costs 

Abandonment of mineral properties 

Impairment of assets held for sale 
Accretion of asset retirement obligation 

Total other operating costs and expenses 

Selling, general & administration 

Selling costs 
Intangible asset amortization 

General and administration 

Costs directly attributable to acquisitions 

Total selling, general & administration 

Years ended December 31,  
2016 

2015 

2017 

$ 

$ 

24,467 
6,579 
31,046 

$ 

54,432 
120 
54,552 

14,676 

4,729 

19,405 

3,305 

8,336 

8,821 

3,659 

287 
3,799 

1,733 

18,299 

275 
3,297 

14,923 

— 

18,495 

35,315 

138 

35,453 

5,362 

13,737 

21,118 

10,234 

1,036 
— 

906 

33,294 

379 
3,319 

15,519 

— 

19,217 

60,696 
655 
61,351 

37,384 

233 

37,617 

— 

23,734 

8,762 

10,765 

2,770 
— 

494 

22,791 

316 
5,364 

12,325 

6,886 

24,891 

Operating loss before impairment 

(28,458) 

(38,774) 

(23,948) 

Impairment of goodwill and property, plant and equipment 

Impairment of property, plant and equipment and mineral properties 
Impairment of goodwill 

Impairment 

Total Operating Loss 
Interest expense 

Other income (expense) 
Income tax expense  

Net loss 

Basic and diluted loss per share 

Results of Operations 

— 
— 

— 

(28,458) 
(2,101) 

2,569 

— 

— 
— 

— 

(38,774) 
(2,289) 

1,199 

— 

8,224 
47,730 

55,954 

(79,902) 
(2,035) 

(420) 

— 

$ 

$ 

(27,990) 

$ 

(39,864) 

$ 

(82,357) 

(0.39) 

$ 

(0.70) 

$ 

(2.46) 

Year ended December 31, 2017 compared to year ended December 31, 2016 

For the year ended December 31, 2017 the Company recorded a net loss of $27.99 million or $0.39 per share compared with a 
loss of $39.86 million or $0.70 per share for the year ended December 31, 2016. 

123 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
For the year ended December 31, 2017, the Company recorded an operating loss before impairment of $28.46 million compared 
with an operating loss before impairment of $38.77 million for the year ended December 31, 2016. 

Revenues 

The Company’s revenues from uranium are largely based on delivery schedules under long-term contracts, which can vary from 
quarter to quarter. 

Revenues  for  the  year  ended  December 31,  2017  totaled  $31.05  million  compared  with  $54.55  million  in  the  year  ended 
December 31, 2016. 

Revenues for the year ended December 31, 2017 totaled $31.05 million, of which $24.47 million were sales of 520,000 pounds 
of U3O8, which included the sale of 320,000 pounds of U3O8 pursuant to term contracts at an average price of $62.72 per pound 
and the sale of 200,000 pounds of U3O8  into contracts based on spot market prices at an average price of $21.99 per pound. 

Revenues for the year ended December 31, 2016 totaled $54.55 million, of which $54.43 million were sales 
of 1,147,933 pounds of U3O8, which included the sale of 850,000 pounds of U3O8 pursuant to term contracts at an average price 
of $56.64 per pound and the sale of 297,933 pounds of U3O8 based on spot market prices at an average price of $21.10 per 
pound. 

Operating Expenses 

Uranium recovered and costs and expenses applicable to revenue 

In the year ended December 31, 2017, the Company recovered 1,570,000 pounds of U3O8  of which 624,000 pounds were for 
the Company's own account and 946,000 pounds were for the account of a tolling customer.  Of the 624,000 pounds recovered 
for its own account, 365,000 pounds were from alternate feed sources and 259,000 pounds were from ISR recovery activities. 

In the year ended December 31, 2016, the Company recovered 1,015,000 pounds of U3O8 for its own account.  Of the 
1,015,000 pounds recovered, 335,000 pounds were from the Company's ISR recovery activities and 680,000 pounds were from 
the Company's Conventional recovery activities. The Conventional recovery activities included recovery of 249,000 pounds 
from alternate feed sources and 431,000 pounds from conventional feed material. 

Costs and expenses applicable to revenue for the year ended December 31, 2017 totaled $19.41 million, compared with $35.45 
million for the year ended December 31, 2016. Included in cost and expenses applicable to revenue is $4.73 million related to toll 
processing and other (2016 - $0.14 million). The decrease in the cost of sales was primarily attributable to a decrease in the quantity 
of U3O8 sold year over year as discussed above partially offet by an increase in toll processing and other. Costs of goods sold 
averaged $28.22 per pound and $30.88 per pound in the years ended December 31, 2017 and 2016, respectively. 

Other Operating Costs and Expenses 

Development, permitting and land holding 

For the year ended December 31, 2017, the Company spent $8.82 million for development of the Canyon Mine, construction of 
a wellfield and a header house at the Nichols Ranch Project, and permitting and land holding costs related to these and other 
projects. While we expect the amounts relative to the items listed above have added future value to the Company, we expense 
these amounts as we do not have proven or probable reserves at any of the Company's projects under SEC Industry Guide 7. For 
the year ended December 31, 2016, we spent $21.12 million for development of the Canyon Mine, replacement of leach tanks for 
the processing of mineralized material at the White Mesa Mill, construction of three wellfields and header houses, the completion 
of the elution plant at the Nichols Ranch Project, and permitting and land holding costs related to these and other projects. 

Standby expense 

The Company’s La Sal and Daneros Projects were placed on standby in 2012, as a result of market conditions. In February 2014, 
the Company placed its Arizona 1 Project on standby. In 2015 and 2016, the White Mesa Mill was operated at lower levels of 
uranium recovery, including prolonged periods of standby. Costs related to the care and maintenance of the standby mines, along 
with standby costs incurred while the White Mesa Mill was operating at low levels of uranium recovery or on standby, are expensed. 

For the year ended December 31, 2017, standby costs totaled $3.66 million compared with $10.23 million in the prior year. The 
decrease is primarily related to decreased standby costs incurred due to toll milling activities at the White Mesa Mill during 2017. 
In 2018 the White Mesa Mill may operate at lower levels of uranium recovery, and excess costs will again be expensed to standby. 

124 

 
 
Abandonment of mineral properties 

The Company has allocated value to mineral properties upon their acquisition.  From time to time, the Company may choose to 
abandon these mineral properties by not paying the required renewal fees.  For the year ended December 31, 2017 the Company 
did not renew certain mineral leases and recorded abandonment expense of $0.29 million compared with $1.04 million for the 
year ended December 31, 2016. 

Accretion 

Accretion related to the asset retirement obligation for the Company’s properties increased for the year ended December 31, 2017 
$1.73 million compared with the prior year $0.91 million primarily due to including a full year of accretion of the Alta Mesa 
Project which was acquired in June of 2016. 

Selling, General, and Administrative 

Selling, general, and administrative expense includes costs associated with marketing uranium, corporate general and administrative 
costs, and non-cash costs of amortization of above-market sales contract value associated with the acquisition of Denison’s US 
Mining Division in June 2012 and the Uranerz acquisition in June 2015. General and administrative expenses consist primarily 
of payroll and related expenses for personnel, contract and professional services, stock-based compensation expense and other 
overhead expenditures. Selling, general and administrative expenses totaled $18.50 million for the year ended December 31, 2017 
compared to $19.22 million for the year ended December 31, 2016. The decrease is a result of the Company's cost cutting measures 
partially offset by an increase in share based compensation. 

Impairment 

The Company, at each reporting date, in accordance with its accounting policy, carries out a review and evaluation of its long- 
lived assets when events or changes in circumstances indicate that the carrying amounts may not be recoverable. 

The Company’s estimate of the long term uranium price is one of the factors used to assess whether there is an indication of 
impairment.  The quoted market prices of uranium have fluctuated significantly in the past few years; however, at December   
31, 2017, the Company believes the long-term outlook of the uranium industry is positive and expects uranium prices to exceed 
$60.00 per pound in the future.  Accordingly, based on review of our assets including the long-term outlook of the uranium 
industry, at December 31, 2017, we did not identify any change in circumstances that the carrying amounts of our long-lived 
assets may not be recoverable. Future uranium prices are uncertain and in the event uranium prices do not meet the Company's 
expectations, we may have impairments in the future and such impairments may be material.  The Company reached the same 
conclusion in the year ended December 31, 2016. 

Interest Expense and Other Income and Expenses 

Interest Expense 

Interest expense for the year ended December 31, 2017 was $2.10 million compared with $2.29 million in the prior year due to 
lower principal amounts from the Wyoming revenue bond loan and the put option conversion of the convertible debentures. 

Other income and expense 

For the year ended December 31, 2017, other income and expense totaled $2.57 million income. These amounts consist of sales 
of surplus assets of $1.91 million, a gain for the change in fair value of derivative liabilities of $$0.78 million, a $0.51 million 
increase in the value of investments accounted at fair value, gains in miscellaneous items of $0.14 million and interest income of 
$0.16 million partially offset by loss in the mark-to-market values of the Company's debentures of $0.94 million. 

For the year ended December 31, 2016, other income and expense totaled $1.20 million income. These amounts consist of a 
gain in value of derivative liabilities of $0.41 million, gains in miscellaneous items of $1.05 million, interest income of $0.14 
million partially offset by loss in the mark-to-market values of the Company's debentures of $0.4 million. 

Results of Operations 

Year ended December 31, 2016 compared to year ended December 31, 2015 

For the year ended December 31, 2016 the Company recorded a net loss of $39.86 million or $0.70 per share compared with a 
loss of $82.36 million or $2.46 per share for the year ended December 31, 2015. 

For the year ended December 31, 2016, the Company recorded an operating loss before impairment of $38.77 million compared 
with an operating loss before impairment of $23.95 million for the year ended December 31, 2015. 

125 

 
Revenues 

The Company’s revenues from uranium are largely based on delivery schedules under long-term contracts, which can vary from 
quarter to quarter. 

Revenues  for  the  year  ended  December 31,  2016  totaled  $54.55  million  compared  with  $61.35  million  in  the  year  ended 
December 31, 2015. 

Revenues for the year ended December 31, 2016 totaled $54.55 million, of which $54.43 million were sales of 1,147,933 pounds 
of U3O8, which included the sale of 850,000 pounds of U3O8 pursuant to term contracts at an average price of $56.64 per pound 
and the sale of 297,933 pounds of U3O8  based on spot market prices at an average price of $21.10 per pound. 

Sales related to the Conventional uranium activities totaled 847,933 pounds of U3O8, of which 750,000 pounds of U3O8 were under 
long-term contracts at an average price of $54.86 and 97,933 pounds of U3O8  were from spot sales at a price of $26.74 per pound. 
Included in the sales under contract for the for the year ended December 31, 2016 were 600,000 pounds of U3O8, which were the 
final contractual deliveries under one of our sales contracts. 

Sales related to the ISR uranium activities totaled 300,000 pounds of U3O8, of which 100,000 pounds of U3O8 were under long- 
term contracts at an average price of $70.00 and 200,000 pounds of U3O8  were based on spot sales prices at a price of $18.34 per 
pound. 

Revenues for the year ended December 31, 2015 totaled $61.35 million, of which $60.70 million were sales of 1,075,000 pounds 
of U3O8, which included the sale of 1,025,000 pounds of U3O8  pursuant to term contracts at an average price of $57.39 per pound 
and the sale of 50,000 pounds of  U3O8 on the spot market at a price of $37.35 per pound. 

Operating Expenses 

Uranium recovered and costs and expenses applicable to revenue 

In the year ended December 31, 2016, the Company recovered 1,015,000 pounds of U3O8  of which 335,000 pounds were from 
the Company's ISR uranium activities and 680,000 pounds were from the Company's Conventional uranium activities.  The 
Conventional uranium activities included recovery of 249,000 pounds from alternate feed sources and 431,000 pounds from 
conventional feed material. 

In the year ended December 31, 2015, the Company recovered 468,000 pounds of U3O8  of which 72,000 pounds of U3O8  were for 
the account of a third party under processing agreements. Uranium recovered for its own account included approximately 172,000 
pounds from its new ISR uranium activities for the period from acquisition (June 18, 2015 through December 31, 2015), 199,000 
pounds from alternate feed sources and 25,000 pounds from conventional feed material from our Conventional uranium activities. 

Costs and expenses applicable to revenue for the year ended December 31, 2016 totaled $35.45 million, compared with $37.62 
million for the year ended December 31, 2015. The decrease in the cost of sales was primarily attributable to a decrease in average 
cost per pound partially offset by an increase in the quantity of U3O8  sold year over year as discussed above. Costs of goods sold 
averaged $30.88 per pound and $34.99 per pound in the years ended December 31, 2016 and 2015, respectively. 

Other operating costs and expenses 

Development, permitting and land holding 

For the year ended December 31, 2016, the Company spent $21.12 million for development of the Canyon Mine, replacement of 
leach tanks for the processing of mineralized material at the White Mesa Mill, construction of three wellfields and header houses 
and the completion of the elution plant at the Nichols Ranch Project and permitting and land holding costs related to these and 
other projects. While we expect the amounts expensed relative to the items listed above have added future value to the Company, 
we expense these amounts as we do not have proven or probable reserves at any of the Company's projects under SEC Industry 
Guide 7. For the year ended December 31, 2015, we spent $8.76 million primarily on permitting, wellfield construction and partial 
construction of the elution circuit at our Nichols Ranch Project. 

Standby expense 

The Company’s La Sal and Daneros Projects were placed on standby in the last quarter of calendar year 2012, as a result of market 
conditions. In February 2014, the Company placed its Arizona 1 Project on standby. In 2015 and 2016, the White Mesa Mill was 
operated at lower levels of uranium recovery, including prolonged periods of standby. Costs related to the care and maintenance 
of the standby mines, along with standby costs incurred while the White Mesa Mill was operating at low levels of uranium recovery 
or on standby, are expensed. 

126 

 
For the year ended December 31, 2016, standby costs totaled $10.23 million compared with $10.77 million in the prior year. The 
decrease is primarily related to decreased standby costs at the White Mesa Mill partially offset by holding costs for Alta Mesa. 
The White Mesa Mill operated a conventional campaign during third quarter of 2016 which resulted in a decreased amount of 
time the White Mesa Mill was on standby and higher uranium recovery levels. 

Abandonment of mineral properties 

The Company has allocated value to mineral properties upon their acquisition.  From time to time, the Company may choose to 
abandon these mineral properties by not paying the required renewal fees.  For the year ended December 31, 2016 the Company 
did not renew certain mineral leases and recorded abandonment expense of $1.04 million compared with $2.77 million for the 
year ended December 31, 2015. 

Accretion 

Accretion related to the asset retirement obligation for the Company’s properties increased for the year ended December 31, 2016 
$0.91 million compared  with the prior year $0.49  million primarily due to the increase in the amount of the asset retirement 
obligation added in connection with the Alta Mesa acquisition and a full year of accretion related to the Nichols Ranch Project 
acquired in June of 2015. 

Selling, General, and Administrative 

Selling, general, and administrative expense includes costs associated with marketing uranium, corporate general and administrative 
costs, and non-cash costs of amortization of above-market sales contract value associated with the acquisition of Denison’s US 
Mining Division in June 2012 and the Uranerz acquisition in June 2015. General and administrative expenses consist primarily 
of payroll and related expenses for personnel, contract and professional services, stock-based compensation expense and other 
overhead expenditures. Selling, general and administrative expenses totaled $19.22 million for the year ended December 31, 2016 
compared to $24.89 million for the year ended December 31, 2015. The decrease is a result of lower amortization of intangible 
asset amortization as a result of the lower level of term sales discussed above, absence of costs related to the acquisition of Uranerz 
in 2015 ($6.89 million) offset by an overall increase in the level of general and administrative expense due to the increase in the 
size of the organization resulting from the acquisitions. 

Impairment 

On June 18, 2015, the Company recorded goodwill of $47.73 million associated with the acquisition of Uranerz on that date. The 
goodwill was a result of the value of the equity consideration given up to acquire Uranerz, which was in excess of the value of 
the assets acquired, net of obligations assumed and was valued at the closing price on the day of the acquisition ($4.16 per share). 
In the period following the acquisition of Uranerz to December 31, 2015, the uranium spot market price fell around 20% and the 
value of our shares and related market capitalization decreased significantly due to a number of factors. As a result, the Company 
evaluated the acquisition value of the goodwill at December 31, 2015, based on its annual impairment test for goodwill, and 
determined that the goodwill should be fully impaired. 

Also, in the year ended December 31, 2015, the Company made the decision to sell or abandon certain non-core mineral resource 
properties that it felt were not essential to its future operations in order to save costs and/or receive value for these properties. 
These properties are currently being marketed for sale or have already been sold. A total of $8.22 million of our mineral resource 
properties were impaired based on our review of the properties and their associated carrying values. 

Interest Expense and Other Income and Expenses 

Interest Expense 

Interest expense for the year ended December 31, 2016 was $2.29 million compared with $2.04 million in the prior year. 

Other income and expense 

For the year ended December 31, 2016, other income and expense totaled $1.20 million income. These amounts consist of a gain 
in value of derivative liabilities of $0.41 million, gains in miscellaneous items of $1.05 million, interest income of $0.14 million 
partially offset by loss in the mark-to-market values of the Company's debentures of $0.4 million. 

Other income and expense for the year ended December 31, 2015 totaled $0.42 million expense and consisted of a change in the 
mark-to-market values of the Company’s Debentures totaling $1.55 million partially offset by a change in the value of derivative 
liabilities related to warrants of $0.59 million and other income amounts totaling $0.54 million. 

127 

 
LIQUIDITY AND CAPITAL RESOURCES 

Funding of major business and property acquisitions 

Over the past six years the Company has funded major business and property acquisitions with capital provided by issuance of 
its common shares. In 2012 we acquired Titan Uranium Inc. and the US Mining Division of Denison, in 2013 we acquired Strathmore 
Minerals Corp, in 2015 we acquired Uranerz and in 2016 we acquired Mesteña, each in exchange for newly issued shares. 

We intend to continue to acquire assets utilizing common shares when we can do so under attractive terms. 

Cash issued for shares 

On December 23, 2016, the Company filed a prospectus supplement in both Canada and the United States to its Canadian base 
shelf prospectus and U.S. registration statement on Form S-3 which enabled the Company, at its discretion from time to time, to 
sell up to $20 million worth of Common Shares by way of an “at-the-market” offering (the “ATM”). From January 1, 2017 to 
March 9, 2018, a total of 7,591,949 Common Shares have been sold under the ATM, for net proceeds to the Company of $14.83 
million. 

On December 29, 2017, the Company filed a prospectus supplement to its U.S. registration statement, qualifying for distribution 
up to $30.00 million in additional common shares under the ATM. 

Working capital at December 31, 2017 and future requirements for funds 

At December 31, 2017, the Company had working capital of $33.30 million, including $18.57 million in cash and 595,000 pounds 
of finished goods inventory. The Company believes it has sufficient cash and resources to carry out its business plan for at least 
the next twelve months. 

The Company is actively focused on its forward looking liquidity needs, especially in light of the current depressed uranium 
markets. The Company is evaluating its ongoing fixed cost structure as well as decisions related to project retention, 
advancement and development. If current uranium prices persist for any extended period of time, the Company will likely be 
required to raise capital or take other measures to fund its ongoing operations. Significant development activities, if warranted, 
will require that we arrange for financing in advance of planned expenditures. In addition, we expect to continue to augment 
our current financial resources with external financing as our long term business needs require. 

The Company manages liquidity risk through the management of its capital structure. Accounts payable and accrued liabilities, 
current portion of notes payable and current taxes payable are due within the current operating year. 

Cash and cash flows 

Year ended December 31, 2017 

Cash and cash equivalents were $18.57 million at December 31, 2017, compared to $16.90 million at December 31, 2016. The 
increase of $1.67 million was due primarily to cash provided by financing activities of $10.42 million, cash provided in investing 
activities of $1.05 million, gain on foreign exchange on cash held of $0.54 million, partially offset by cash used in operations of 
$10.34 million. 

Net cash provided by financing activities totaled $10.42 million consisting primarily of $14.15 million proceeds from the issuance 
of stock using the Company's ATM offering, and cash received from non-controlling interests of $0.37 million, partially offset by 
$4.10 million to repay loans and borrowings. 

Net cash used in operating activities of $10.34 million is comprised of the net loss of $27.99 million for the period adjusted for 
non-cash items and for changes in working capital items. Significant items not involving cash were $4.64 million of depreciation 
and amortization of property, plant and equipment, shared based compensation of $3.53 million, $3.31 million impairment on 
inventory, impairment of mineral properties held for sale of $3.80 million, accretion of ARO of $1.73 million, offset by a $1.41 
million decrease in accounts payable and accrued liabilities, $0.78 million change in warrant liabilities and $0.74 million in cash 
paid for reclamation and remediation activities. 

Net cash provided by investing activities  was $1.05  million, which  was from receipts of additional refunded cash previously 
deposited with regulatory agencies. 

Year ended December 31, 2016 

Cash and cash equivalents were $16.90 million at December 31, 2016, compared to $12.97 million at December 31, 2015. The 
increase of $3.93 million was due primarily to cash provided by financing activities of $22.18 million, partially offset by cash 
used in operations of $12.04 million, cash used in investing activities of $6.27 million. 

128 

 
Net cash provided by financing activities totaled $22.18 million consisting primarily of $25.29 million proceeds from the issuance 
of stock in the March 2016, September 2016 public offerings, ATM and for exercise of options and warrants, cash received from 
non-controlling interests of $0.04 million, partially offset by $3.17 million to repay loans and borrowings. 

Net cash used in operating activities of $12.04 million is comprised of the net loss of $39.86 million for the period adjusted for 
non-cash items and for changes in working capital items. Significant items not involving cash were $4.26 million of depreciation 
and  amortization  of  property,  plant  and  equipment,  adjustment  to  asset    retirement    obligation    of    $4.19    million,    $5.36 
million impairment on inventory, $1.04 million abandonment of mineral properties, a $13.16 million decrease in inventories, $2.40 
million decrease in trade and other receivables offset by a $4.01 million decrease in accounts payable and accrued liabilities and 
$2.09 million in cash paid for reclamation and remediation activities. 

Net cash used by investing activities was $6.27 million, which was primarily related to expenditures for the Alta Mesa acquisition 
net of cash acquired of $1.29 million and cash expenditures related to additional cash deposited with regulatory agencies of $5.66 
million offset by cash received from the sale of mineral properties held for sale of $0.85 million. 

Contractual Obligations 

The following table summarizes our contractual obligations as of December 31, 2017. 

Payments due by period - $000 

Less than 1 

More than 

Total 

year 

1 - 3 years 

3 - 5 years 

5 years 

Long-term debt obligations - principal payable in 
cash 

Interest on long-term debt obligations 

Operating lease obligations 

Purchase obligations 

Deferred income 

Decommissioning liabilities (undiscounted) 

Subtotal - payable in cash 

Long-term obligations - principal payable in cash 
or common shares at Company discretion 
Total contractual obligations 

$ 

10,855 

$ 

3,414 

$ 

7,441 

$ 

— 

$ 

3,727 

1,836 

48 

2,339 

43,457 

62,262 

16,636 

1,491 

407 

41 

— 

32 

5,385 

2,236 

588 

7 

— 

4,495 

14,767 

16,636 

— 

694 

— 

— 

3,440 

4,134 

— 

— 

147 

— 

2,339 

35,490 

37,976 

$ 

78,898  $ 

5,385  $ 

31,403  $ 

4,134  $ 

37,976 

In addition, the Company entered into commitments with federal and state agencies and private individuals to lease surface and 
mineral rights. These leases are renewable annually and are expected to total $1.00 million for the year ended December 31, 2018. 

Critical accounting estimates and judgments 

The  preparation  of  these  consolidated  financial  statements  in  accordance  with  US  GAAP requires  the  use  of  certain  critical 
accounting estimates and judgments that affect the amounts reported. It also requires management to exercise judgment in applying 
the Company’s accounting policies. These judgments and estimates are based on management’s best knowledge of the relevant 
facts and circumstances taking into account previous experience. Although the Company  regularly reviews the estimates and 
judgments made that affect these financial statements, actual results may be materially different. 

Significant estimates made by management include: 

a.  Exploration Stage 

SEC Industry Guide 7 defines a reserve as “that part of a mineral deposit which could be economically and legally extracted or 
produced at the time of the reserve determination”. The classification of a reserve must be evidenced by a bankable feasibility 
study using the latest three-year price average. While the Company has established the existence of mineral resources and has 
successfully extracted and recovered saleable uranium from certain of these resources, the Company has not established proven 
or probable reserves, as defined under SEC Industry Guide 7, for these operations or any of its uranium projects. As a result, the 
Company is in the Exploration Stage as defined under Industry Guide 7. Furthermore, the Company has no plans to establish 
proven or probable reserves for any of its uranium projects. 

While in the Exploration Stage, among other things, the Company must expense all amounts that would normally be capitalized 
and subsequently depreciated or depleted over the life of the mining operation on properties that have proven or probable reserves. 

129 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Items such as the construction of wellfields and related header houses, additions to our recovery facilities and advancement of 
properties will all be expensed in the period incurred. As a result, the Company’s consolidated financial statements may not be 
directly comparable to the financial statements of mining companies in the development or production stages. 

b.  Resource estimates utilized 

The Company utilizes estimates of its mineral resources based on information compiled by appropriately qualified persons. The 
information relating to the geological data on the size, depth and shape of the deposits requires complex geological judgments to 
interpret the data. The estimation of future cash flows related to resources is based upon factors such as estimates of future uranium 
prices, future construction and operating costs along with geological assumptions and judgments made in estimating the size and 
grade of the resource. Changes in the mineral resource estimates may impact the carrying value of mining and recovery assets, 
goodwill, reclamation and remediation obligations and depreciation and impairment. 

c.  Valuation of mining and recovery assets in a business combination 

We value assets in a business combination based on our estimates of the fair value of the mining and recovery assets acquired. 

For mining and recovery assets actively extracting and recovering uranium as well as those assets that we expect to extract uranium 
from, we value the assets based on the income approach. As we have not acquired proven or probable reserves in our business 
combinations the value ascribed to these assets is based on our estimates of value beyond proven and probable reserves. The value 
is calculated based, in part, on technical reports prepared under NI 43-101. Our estimates of extraction and recovery activities and 
related  timing  of  extraction  and  recovery  as  well  as  the  costs  involved  are  demonstrated  by  at  least  a  preliminary  economic 
assessment. We then adjust the results of the technical reports to include the effects of anticipated fluctuations in the future market 
price of uranium consistent with what we believe to be the expectations of other market participants as well as any expected 
operational or cost changes that we expect in the future operations of these mining assets. These cash flow estimates include the 
estimated cash outflows to develop, extract and recover the estimated saleable U3O8  from these operations. 

For mining assets that will be held for further evaluation or for sale, we use the market approach utilizing implied transaction 
multiples from historical uranium interests transactions. 

d.  Valuation of mining assets acquired other than in a business combination 

The costs of mining assets that are acquired in an asset purchase transaction are recorded as mineral interests on the date of purchase 
based on the consideration given up for the assets. If multiple assets are involved in a transaction, the consideration is allocated 
based on the relative values of the properties acquired. 

e.  Depreciation of mining and recovery assets acquired 

For mining and recovery assets actively extracting and recovering uranium we depreciate the acquisition costs of the mining and 
recovery assets on a straight line basis over our estimated lives of the mining and recovery assets. The process of estimating the 
useful  life  of  the  mining  and  recovery  assets  requires  significant  judgment  in  evaluating  and  assessing  available  geological, 
geophysical, engineering and economic data, projected rates of extraction and recovery, estimated commodity price forecasts and 
the timing of future expenditures, all of which are, by their very nature, subject to interpretation and uncertainty. 

Changes in these estimates may materially impact the carrying value of the Company’s mining and recovery assets and the recorded 
amount of depreciation. 

f.  Business combinations 

Management uses judgment in applying the acquisition method of accounting for business combinations and in determining fair 
values of the identifiable assets and liabilities acquired. The value placed on the acquired assets and liabilities, including identifiable 
intangible assets, will have an effect on the amount of goodwill or bargain purchase gain that the Company may record on an 
acquisition. Changes in economic conditions, commodity prices and other factors between the date that an acquisition is announced 
and when it finally is consummated can have a material difference on the allocation used to record a preliminary purchase price 
allocation versus the final purchase price allocation which can take up to one year after acquisition to complete. See b. above for 
information related to the valuation of mining and recovery assets in this process. 

130 

 
g. 

Impairment testing of mining and recovery assets 

The  Company  undertakes  a  review  of  the  carrying  values  of  its  mining  and  recovery  assets  whenever  events  or  changes  in 
circumstances indicate that their carrying values may exceed their estimated net recoverable amounts determined by reference to 
estimated future operating results and net cash flows. An impairment loss is recognized when the carrying value of a mining or 
recovery asset is not recoverable based on this analysis. In undertaking this review, the management of the Company is required 
to  make  significant  estimates  of,  among  other  things,  future  production  and  sale  volumes,  forecast  commodity  prices,  future 
operating and capital costs and reclamation costs to the end of the mining asset’s life. These estimates are subject to various risks 
and uncertainties, which may ultimately have an effect on the expected recoverability of the carrying values of mining and recovery 
assets. 

h.  Asset retirement obligations 

Asset retirement obligations are recorded as a liability when an asset that will require reclamation and remediation is initially 
acquired. For disturbances created on a property owned that will require future reclamation and remediation the Company records 
asset retirement obligations for such disturbance when occurred. The Company has accrued its best estimate of its share of the 
cost to decommission its mining and milling properties in accordance with existing laws, contracts and other policies. The estimate 
of future costs involves a number of estimates relating to timing, type of costs, mine closure plans, and review of potential methods 
and technical advancements. Furthermore, due to uncertainties concerning environmental remediation, the ultimate cost of the 
Company’s decommissioning liability could differ from amounts provided. The estimate of the Company’s obligation is subject 
to change due to amendments to applicable laws and regulations and as new information concerning the Company’s operations 
becomes available. The Company is not able to determine the impact on its financial position, if any, of environmental laws and 
regulations that may be enacted in the future. Additionally, the expected cash flows in the future are discounted at the Company’s 
estimated  cost  of  capital  based  on  the  periods  the  Company  expects  to  complete  the  reclamation  and  remediation  activities. 
Differences in the expected periods of reclamation or in the discount rates used could have a material difference in the actual 
settlement of the obligations compared with the amounts provided 

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 

The Company is exposed to risks associated with commodity prices, interest rates and credit. Commodity price risk is defined as 
the potential loss that we may incur as a result of changes in the market value of uranium. Interest rate risk results from our debt 
and equity instruments that we issue to provide financing and liquidity for our business. Credit risk arises from the extension of 
credit throughout all aspects of our business. Industry-wide risks can also affect our general ability to finance exploration, and 
development of exploitable resources; such effects are not predictable or quantifiable. Market risk is the risk to the Company of 
adverse financial impact due to change in the fair value or future cash flows of financial instruments as a result of fluctuations in 
interest rates and foreign currency exchange rates. 

Commodity Price Risk 

The Company is subject to market risk related to the market price of U3O8. Two of our four supply contracts contain favorable 
pricing above current spot prices; however, these long term prices cover only a portion of our planned uranium recovery. The 
Company's existing long term contracts expire following the Company's 2018 deliveries, and all uranium sales after 2018 will be 
required to be made at spot prices until the Company enters into new long-term contracts at satisfactory prices in the  future. 
Revenue beyond our current contracts will be affected by both spot and long-term U3O8  price fluctuations which are beyond our 
control, including: the demand for nuclear power; political and economic conditions; governmental legislation in uranium producing 
and consuming countries; and production levels and costs of production of other producing companies. The Company continuously 
monitors the market to determine its level of extraction and recovery of uranium in the future. 

Interest Rate Risk 

The Company is exposed to interest rate risk on its cash equivalents, deposits, restricted cash, and debt. Our interest earned is not 
material; thus not subject to significant risk. Our Wyoming Industrial Development Revenue Bond has a fixed interest rate over 
its remaining four year life, removing variability. The Company is exposed to an interest rate risk associated with the Debentures, 
which is based on the spot market price of U3O8. These debentures mature in December 2020. The Company does not expect the 
spot  market  price  of  U3O8 to exceed  $54.99  prior  to  the  debentures’ maturity  and,  accordingly,  does  not  believe  there  is  any 
significant interest rate risk related to these debentures. The Company does not use derivatives to manage interest rate risk. The 
following chart displays the interest rate applicable to our convertible debentures at various U3O8  price levels. 

131 

 
 
 
 
UxC U3O8  Weekly Indicator Price 
Up to $54.99 
$55.00–$59.99 
$60.00–$64.99 
$65.00–$69.99 
$70.00–$74.99 
$75.00–$79.99 
$80.00–$84.99 
$85.00–$89.99 
$90.00–$94.99 
$95.00–$99.99 
$100 and above 

Annual Interest Rate 
8.5% 
9% 
9.5% 
10% 
10.5% 
11% 
11.5% 
12% 
12.5% 
13% 
13.5% 

Currency Risk 

The foreign exchange risk relates to the risk that the value of financial commitments, recognized assets or liabilities will fluctuate 
due to changes in foreign currency rates. The Company does not use any derivative instruments to reduce its exposure to fluctuations 
in foreign currency exchange rates. As the US Dollar is the functional currency of our U.S. operations, the currency risk has been 
reduced. We maintain a nominal balance in foreign currency, resulting in a low currency risk relative to our cash balances. Our 
Debentures are denominated in Canadian Dollars and, accordingly, are exposed to currency risk. 

The following table summarizes, in United States dollar equivalents, the Company’s major foreign currency (Cdn$) exposures as 
of December 31, 2017 ($000): 

Cash and cash equivalents 
Accounts payable and accrued liabilities 

Loans and borrowings 

Total 

$ 

$ 

6,128 
(531) 

(16,636) 

(11,039) 

The table below summarizes a sensitivity analysis for significant unsettled currency risk exposure with respect to our financial 
instruments as at December 31, 2017 with all other variables held constant. It shows how net income would have been affected 
by changes in the relevant risk variables that were reasonably possible at that date. 

('000s) 

Change for 
Sensitivity Analysis 

Increase (decrease) in 
other comprehensive 
income 

Strengthening net earnings 

Weakening net earnings 

Credit Risk 

+1% change in 
U.S. 

dollar 

$ 

-1% change in U.S. 

dollar 

$ 

(138) 

138 

Credit risk relates to cash and cash equivalents, trade, and other receivables that arise from the possibility that any counterparty 
to an instrument fails to perform. The Company only transacts with highly-rated counterparties and a limit on contingent exposure 
has been established for any counterparty based on that counterparty’s credit rating. The Company’s sales are attributable mainly 
to large utilities. As at December 31, 2017, the Company’s maximum exposure to credit risk was the carrying value of cash and 
cash equivalents and trade receivables. 

132 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA 

ENERGY FUELS INC. 
CONSOLIDATED FINANCIAL STATEMENTS 
December 31, 2017 
Contents 

Report of Independent Registered Public Accounting Firms 
Financial Statements: 

Consolidated Statements of Operations and Comprehensive Loss for the years ended December 31, 
2017, December 31, 2016 and December 31, 2015 
Consolidated Balance Sheets at December 31, 2017 and December 31, 2016 
Consolidated Statements of Changes in Equity for the years ended December 31, 2017, December 31, 
2016 and December 31, 2015 
Consolidated Statements of Cash Flows for the years ended December 31, 2017, December 31, 2016 
and December 31, 2015 
Notes to the Consolidated Financial Statements 

F-1 

F-2 

F-3 
F-4 

F-5 
F-6 

133 

 
 
 
 
 
 
 
 
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM 

The Shareholders and Board of Directors 
Energy Fuels Inc.: 

Opinion on the Consolidated Financial Statements 

We have audited the accompanying consolidated balance sheet of Energy Fuels Inc. (the Company) as of December 31, 
2017, the related consolidated statements of operations and comprehensive loss, changes in equity, and cash flows for the year 
ended December 31, 2017, and the related notes (collectively, the consolidated financial statements). In our opinion, the consolidated 
financial statements present fairly, in all material respects, the financial position of the Company as of December 31 2017, and 
the results of its operations and its cash flows for the year ended December 31, 2017, in conformity with U.S. generally accepted 
accounting principles. 

Basis for Opinion 

These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to 
express an opinion on these consolidated financial statements based on our audit. We are a public accounting firm registered with 
the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to 
the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and 
Exchange Commission and the PCAOB. 

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform 
the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, 
whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal 
control over financial reporting. As part of our audit, we are required to obtain an understanding of internal control over financial 
reporting but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial 
reporting. Accordingly, we express no such opinion. 

Our audit included performing procedures to assess the risks of material misstatement of the consolidated financial 
statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included 
examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audit 
also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating 
the overall presentation of the consolidated financial statements. We believe that our audit provides a reasonable basis for our 
opinion. 

We have served as the Company’s auditor since 2017. 

/s/ KPMG LLP 

Denver, Colorado 
March 9, 2018 

134 

 
 
 
 
 
 
 
 
To the Board of Directors and Shareholders 

Energy Fuels Inc.: 

We have audited the accompanying consolidated balance sheet of Energy Fuels Inc. as of December 31, 2016, and the related 
consolidated statements of operations and comprehensive loss, changes in equity, and cash flows for each of the years in the 
two-year period ended December 31, 2016. These consolidated financial statements are the responsibility of Energy Fuels Inc.'s 
management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits. 

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). 
Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial  
statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and 
disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates 
made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a 
reasonable basis for our opinion. 

In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial 
position of Energy Fuels Inc. as of December 31, 2016, and the results of its operations and its cash flows for each of the years 
in the two-year period ended December 31, 2016, in conformity with U.S. generally accepted accounting principles. 

Chartered Professional Accountants, Licensed Public Accountants 

/s/ KPMG LLP 

March 8, 2017 

Toronto, Canada 

135 

 
 
 
 
 
ENERGY FUELS INC. 
Consolidated Statements of Operations and Comprehensive Loss 
(Expressed in thousands of US dollars, except per share amounts) 

Revenues 
Uranium concentrates 

Alternate feed materials processing and other 

Total revenues 

Costs and expenses applicable to revenue 
Costs and expenses applicable to uranium concentrates 

Costs and expenses applicable to alternate feed materials and other 

Total costs and expenses applicable to revenue 
Impairment of inventories 
Development, permitting and land holding 

Standby costs 

Abandonment of mineral properties 

Impairment of assets held for sale 

Accretion of asset retirement obligation 

Selling costs 

Intangible asset amortization 

General and administration 

Costs directly attributable to acquisitions 
Impairment of plant and equipment and mineral properties 
Impairment of goodwill 

Total operating loss 

Interest expense 
Other income (expense) 
Net loss 

Items that may be reclassified in the future to profit and loss 
Foreign currency translation adjustment 
Unrealized gain/(loss) on available-for-sale assets 
Other comprehensive income (loss) 

Comprehensive loss 

Net loss attributable to: 
Owners of the Company 
Non-controlling interests 

Comprehensive loss attributable to: 
Owners of the Company 
Non-controlling interests 

Basic and diluted loss per share 

See accompanying notes to the consolidated financial statements. 

136 

For the years ended December 31, 

2017 

2016 

2015 

$ 

24,467  $ 

6,579 

31,046 

14,676 

4,729 

19,405 
3,305 
8,821 

3,659 

287 

3,799 

1,733 

275 

3,297 

14,923 

— 
— 
— 

54,432  $ 
120 

54,552 

35,315 

138 

35,453 
5,362 
21,118 

10,234 

1,036 

— 

906 

379 

3,319 

15,519 

— 
— 
— 

60,696 
655 

61,351 

37,384 

233 

37,617 
— 
8,762 

10,765 

2,770 

— 

494 

316 

5,364 

12,325 

6,886 
8,224 
47,730 

(28,458) 

(38,774) 

(79,902) 

(2,101) 
2,569 
(27,990) 

(2,289) 
1,199 
(39,864) 

(2,035) 
(420) 
(82,357) 

(1,049) 
30 
(1,019) 

(729) 
532 
(197) 

3,056 
(136) 
2,920 

(29,009)  $ 

(40,061)  $ 

(79,437) 

(27,766)  $ 
(224) 

(39,413)  $ 
(451) 

(82,217) 
(140) 

(27,990)  $ 

(39,864)  $ 

(82,357) 

(28,785)  $ 
(224) 

(39,610)  $ 
(451) 

(79,297) 
(140) 

(29,009)  $ 

(40,061)  $ 

(79,437) 

(0.39)  $ 

(0.70)  $ 

(2.46) 

$ 

$ 

$ 

$ 

$ 

$ 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ENERGY FUELS INC. 
Consolidated Balance Sheets 
(Expressed in thousands of US dollars, except share amounts) 

ASSETS 

Current assets 
Cash and cash equivalents 
Trade and other receivables, net 

Inventories, net 
Prepaid expenses and other assets 

Mineral properties held for sale 

Total current assets 
Investments accounted for at fair value 

Plant and equipment, net 

Mineral properties, net 

Intangible assets, net 

Restricted cash 

Total assets 

LIABILITIES & EQUITY 

Current liabilities 
Accounts payable and accrued liabilities 

Current portion of asset retirement obligation 

Current portion of loans and borrowings 

Total current liabilities 

Warrant liabilities 

Deferred revenue 

Asset retirement obligation 

Loans and borrowings 

Total liabilities 

Equity 

Share capital 
Common shares, without par value, unlimited shares authorized; shares issued and 
outstanding 74,366,824 at December 31, 2017 and  66,205,153 at December 31, 2016 
Accumulated deficit 

Accumulated other comprehensive income 

Total shareholders' equity 

Non-controlling interests 

Total equity 

Total liabilities and equity 

Commitments and contingencies (Note 18) 

See accompanying notes to the consolidated financial statements. 

137 

December 31, 
2017 

December 31, 
2016 

$ 

18,574  $ 
  1,253 

16,550 
1,814 

5,000 

43,191 
903 

33,076 

83,539 

2,502 

22,127 

16,901 
364 

16,761 
2,104 

— 

36,130 
1,146 

37,582 

92,625 

5,799 

23,175 

$ 

185,338  $ 

196,457 

$ 

6,449  $ 

32 

3,414 

9,895 

3,376 

2,474 

18,248 

24,077 

58,070 

430,383 
(309,287) 

2,289 

123,385 

3,883 

127,268 

$ 

185,338  $ 

5,756 

32 

6,319 

12,107 

3,912 

2,339 

17,001 

23,235 

58,594 

412,334 
(281,521) 

3,308 

134,121 

3,742 

137,863 

196,457 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ENERGY FUELS INC. 
Consolidated Statements of Changes in Equity 
(Expressed in thousands of US dollars, except share amounts) 

Common Stock 

Shares 

Amount 

Deficit 

Accumulated 
other 
comprehensive 
income 

Total 
shareholders' 
equity 

Non- 
controlling 
interests 

Total equity 

Balance at December 31, 2014 

19,677,552     $ 

260,117     $ 

(159,891)    $ 

585     $ 

100,811     $ 

—     $ 

100,811 

Net loss 

Other comprehensive income 

Shares issued in connection with 
the acquisition of Uranerz 
Energy Corporation 

Options issued in connection 
with the acquisition of Uranerz 
Energy Corporation 
Shares issued for cash by at-the- 

market offering 
Share issued for property 

acquisitions 
Shares issued for exercise of 

stock options 
Shares issued for exercise of 
share purchase warrants 

Share issuance cost 

Share-based compensation 

Non-controlling interest upon 
acquisition of Uranerz Energy 
Corporation 
Contributions attributable to 
non-controlling interest 

— 

— 

— 

— 

25,347,209 

105,673 

— 

3,681 

1,275,908 

2,939 

169,361 

48,802 

300 

— 

— 

— 

— 

550 

185 

2 

(312) 

1,099 

— 

— 

(82,217) 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

2,920 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

(82,217) 

2,920 

105,673 

3,681 

2,939 

550 

185 

2 

(312) 

1,099 

— 

— 

(140) 

(82,357) 

— 

— 

— 

— 

— 

— 

— 

— 

— 

2,920 

105,673 

3,681 

2,939 

550 

185 

2 
(312) 

1,099 

3,992 

3,992 

304 

304 

Balance at December 31, 2015 

46,519,132     $ 

373,934     $ 

(242,108)    $ 

3,505     $ 

135,331     $ 

4,156     $ 

139,487 

Net loss 

Other comprehensive income 

Shares issued for cash by at-the- 
market offering 

— 

— 

200,225 

— 

— 

539 

Shares issued for public 
offerings 

Share issuance cost 

Share-based compensation 

Shares issued for exercise of 

stock options 
Shares issued for the vesting of 
restricted stock units 
Shares issued for acquisition of 

Alta Mesa 
Shares issued for acquisition of 

40% interest in Roca Honda 
Shares issued for consulting 

services 
Contributions attributable to 
non-controlling interest 

13,368,750 

22,980 

— 

— 

8,369 

138,608 

(2,330) 

 2,657 

18 

— 

4,551,284 

11,378 

1,212,173 

2,679 

206,612 

— 

479 

— 

(39,413) 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

(197) 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

(39,413) 

(197) 

539 

22,980 

(2,330) 

2,657 

18 

— 

11,378 

2,679 

479 

— 

(451) 

(39,864) 

— 

— 

— 

— 

— 

— 

— 

— 

— 

— 

37 

(197) 

539 

22,980 

(2,330) 

2,657 

18 

— 

11,378 

2,679 

479 

37 

Balance at December 31, 2016 

66,205,153     $ 

412,334     $ 

(281,521)    $ 

3,308     $ 

134,121     $ 

3,742     $ 

137,863 

Net loss 

Other comprehensive income 

Shares issued for cash by at-the- 
market offering 
Shares issued for the vesting of 
restricted stock units 

Share issuance cost 

— 

— 

— 

— 

7,202,479 

14,548 

752,580 

— 

— 

(394) 

(27,766) 

— 

— 

— 

— 

138 

— 

(1,019) 

— 

— 

— 

(27,766) 

(1,019) 

14,548 

— 

(394) 

(224) 

— 

— 

— 

— 

(27,990) 

(1,019) 

14,548 

— 

(394) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Share-based compensation 

Shares issued for consulting 
services 

Contributions attributable to 
non-controlling interest 

— 

3,525 

206,612 

— 

370 

— 

— 

— 

— 

— 

— 

— 

3,525 

370 

— 

— 

— 

365 

3,525 

370 

365 

Balance at December 31, 2017 

74,366,824  $ 

430,383  $ 

(309,287)  $ 

2,289  $ 

123,385  $ 

3,883  $ 

127,268 

See accompanying notes to the consolidated financial statements. 

139 

 
 
 
 
ENERGY FUELS INC. 
Consolidated Statements of Cash Flows 
(Expressed in thousands of US dollars) 

OPERATING ACTIVITIES 
Net loss for the period 

Items not involving cash: 

Depletion, depreciation and amortization 

Stock-based compensation 

Change in value of convertible debentures 

Accretion of asset retirement obligation 

Change in value of warrant liabilities 

Unrealized foreign exchange (gain) loss 

Non-cash standby cost accrued 

Non-cash costs directly attributable to acquisitions 
Impairment of inventories 

Abandonment of mineral properties 

Impairment of goodwill 

Impairment of property, plant and equipment and mineral properties 
Impairment of mineral properties held for sale 

Change in value of investments 
Other non- cash (income) expense 

Changes in assets and liabilities 
Decrease in inventories 

(Increase) decrease in trade and other receivables 
(Increase) decrease in prepaid expenses and other assets 

Increase (decrease) in accounts payable and accrued liabilities 

Changes in deferred revenue 

Cash paid for reclamation and remediation activities 

INVESTING ACTIVITIES 
Purchase of mineral properties and property, plant and equipment 
Acquisition of Uranerz Energy Corporation, net of cash acquired 
Acquisition of Alta Mesa, net of cash acquired 

Acquisition of Roca Honda, net of cash acquired 

Change in cash deposited with regulatory agencies for asset retirement obligations 

Proceeds from sale of mineral properties 

December 
31, 
2017 

December 
31, 
2016 

December 
31, 
2015 

$ 

(27,990)   $    (39,864)   $ 

(82,357) 

4,636 

3,525 

940 

1,733 

(784) 

(263) 

249 

  — 
3,305 

287 

— 

  — 
3,799 

  — 
1,909 

73 

(39) 

290 

(1,410) 

135 

(735) 

4,258 

2,657 

407 

906 

— 

173 

4,186 

  — 
5,362 

1,036 

— 

  — 
  — 

  — 
(437) 

13,158 

2,403 
(365) 

(4,007) 
174 

(2,086) 

(10,340) 

(12,039) 

— 
— 
— 

— 

1,048 

— 

1,048 

(260) 
— 
(1,290) 

101 

(5,663) 

845 

(6,267) 

7,787 

1,099 

1,548 

494 

— 

483 

877 

3,928 
  — 

2,770 

47,730 

8,224 
  — 

(38) 
(500) 

5,751 

(2,017) 
(404) 

2,519 
648 

(626) 

(2,084) 

(4,297) 
2,459 
— 

— 

5,268 

— 

3,430 

140 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FINANCING ACTIVITIES 
Issuance of common shares and warrants for cash 
Option and warrant exercises 

Repayment of loans and borrowings 
Cash received from non-controlling interest 

INCREASE IN CASH AND CASH EQUIVALENTS DURING THE PERIOD 
Effect of exchange rate fluctuations on cash held in foreign currencies 

Cash and cash equivalents - beginning of period 

14,154 
— 

(4,095) 
365 

10,424 

1,132 
541 

16,901 

25,291 
18 

(3,168) 
37 

22,178 

3,872 
64 

2,627 
187 

(1,730) 
304 

1,388 

2,734 
(180) 

12,965 

10,411 

CASH AND CASH EQUIVALENTS - END OF PERIOD 

$ 

18,574  $ 

16,901  $ 

12,965 

Non-cash investing and financing transactions: 
Issuance of secured notes for acquisition of mineral properties 

Issuance of common shares for acquisition of mineral properties 

Issuance of common shares, options and warrants for acquisition of Uranerz Energy 
Corporation 
Issuance of common shares for acquisition of Alta Mesa 

Issuance of common shares for acquisition of 40% interest in Roca Honda 
Issuance of common shares for consulting services 

$ 

—  $ 

—  $ 

446 

550 

— 

— 

— 
370 

— 

109,354 

11,378 

2,679 
479 

— 

— 
— 

Supplemental disclosure of cash flow information: 
Net cash paid during the period for: 

Interest 

See accompanying notes to the consolidated financial statements. 

2,097 

2,029 

1,460 

141 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ENERGY FUELS INC. 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE THREE YEARS ENDED DECEMBER 31, 2017 
(Tabular amounts expressed in thousands of US Dollars except share and per share amounts) 

1. THE COMPANY AND DESCRIPTION OF BUSINESS 

Energy Fuels Inc. was incorporated under the laws of the Province of Alberta and was continued under the Business Corporations 
Act (Ontario). 

Energy Fuels Inc. and its subsidiary companies (collectively “the Company” or “EFI”) are engaged in uranium extraction, recovery 
and sales of uranium from mineral properties and the recycling of uranium bearing materials generated by third parties. As a part 
of these activities the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company’s 
final uranium product, uranium oxide concentrates (“U3O8” or “uranium concentrates”), is sold to customers for further processing 
into fuel for nuclear reactors. 

The  Company  is  an  exploration  stage  mining  company  as  defined  by  the  United  States  (“U.S.”)  Securities  and  Exchange 
Commission (“SEC”) Industry Guide 7 (“SEC Industry Guide 7”) as it has not established the existence of proven or probable 
reserves on any of our properties. 

Energy Fuels is engaged in conventional and In-situ ("ISR") uranium extraction and recovery, along with the exploration, permitting 
and evaluation of uranium properties in the United States. 

Mining activities 

Mining activities consist of a standalone uranium recovery facility (the “White Mesa Mill”), an ISR recovery facility, conventional 
mining projects and ISR mining projects. The conventional projects are located in the Colorado Plateau, Henry Mountains, Arizona 
Strip, and the Roca Honda project in New Mexico which are in the vicinity of the White Mesa Mill, and the Sheep Mountain 
Project in Wyoming. ISR projects include the Nichols Ranch Project, the Jane Dough property and the Hank Project located in 
Wyoming and the Alta Mesa ISR Project (the “Alta Mesa Project”) located in Texas. 

At December 31, 2017, other than shaft-sinking and evaluation work at the Company's Canyon Project, the conventional mining 
projects in the vicinity of the White Mesa Mill and Sheep Mountain are on standby, being evaluated for continued mining activities 
and/or in process of being permitted. The White Mesa Mill also processes third party uranium bearing mineralized materials from 
mining and recycling activities. 

2. BASIS OF PRESENTATION 

The consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the 
United States (“U.S. GAAP”) and are presented in thousands of US dollars (“USD”) except per share amounts. Certain 
footnote disclosures have share prices which are presented in Canadian dollars (“Cdn$”). 

3. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES 

Use of estimates 

The Company's consolidated financial statements have been prepared in accordance with U.S. GAAP. The preparation of the 
Company's consolidated financial statements requires the Company to make estimates and assumptions that affect the reported 
amounts of assets and liabilities and the related disclosure of contingent assets and liabilities at the date of the consolidated financial 
statements and the reported amounts of expenses during the reporting period. The more significant areas requiring the use of 
management estimates and assumptions relate to expectations of the future price of uranium and estimates of recoverable mineral 
resources that are the basis for future cash flow estimates utilized in assessing fair value for business combinations and impairment 
calculations; the determination of whether an acquisition represents a business combination or an asset acquisition; the use of 
management estimates and assumptions related to environmental, reclamation and closure obligations; marketable securities and 
derivative instruments; and stock-based compensation expense. Actual results may differ significantly from these estimates. 

Basis of consolidation 

These consolidated financial statements include the accounts of the Company together with subsidiaries controlled by the Company. 
Intercompany transactions, balances and unrealized gains on transactions between the Company and its subsidiaries are eliminated. 
The functional currency of the Company’s operations is the USD. 

142 

 
 
 
 
 
 
Extracting and recovery activities while in the exploration stage 

The Company extracts or recovers mineralized uranium from mining activities, and alternate feed materials, resulting in saleable 
uranium concentrates from its White Mesa Mill and its Nichols Ranch Project. While the Company has established the existence 
of mineral resources and extracts and processes saleable uranium from these operations, the Company has not established proven 
or probable reserves, as defined under SEC Industry Guide 7, for these operations or any of its uranium projects. Furthermore, 
the Company has no current plans to establish proven or probable reserves for any of its uranium projects. 

While  in  the  exploration  stage,  the  Company  expenses  most  amounts  that  would  normally  be  capitalized  and  subsequently 
depreciated or depleted over the life of the mining operation on properties that have proven or probable reserves. Items such as 
the construction of wellfields and related header houses, additions to recovery facilities and advancement of properties are expensed 
in the period incurred. As a result, the Company’s consolidated financial statements may not be directly comparable to the financial 
statements of mining companies in the development or production stages. 

The White Mesa Mill, and certain conventional mining projects in the vicinity of the White Mesa Mill, and the Nichols Ranch 
Project (collectively the “Extracting and Recovery Operations”) were acquired in two unrelated business combinations. These 
Extracting and Recovery Operations were recorded at fair value on the date of the respective acquisition and included estimated 
values which included valuing these assets utilizing the Company’s estimate of future market prices of uranium and expected 
recoveries of uranium. The values determined included estimated cash flows associated with value beyond proven and probable 
reserves to develop, extract and recover the estimated saleable uranium concentrates from these operations. 

The fair value of the Extracting and Recovery Operations recorded on the acquisition date is depreciated on a straight line basis 
over the estimated useful life of the components of the operation since the Extracting and Recovery Operations do not have proven 
or probable reserves. Accordingly, all expenditures incurred subsequent to the acquisition dates relating  to the preparation of 
properties for mineral extraction, expansion of or additions to the Extracting and Recovery Operations are expensed as incurred. 
This includes expenditures relating to activities such as preparing properties for mineral extraction, construction of mine wellfields, 
header houses and disposal wells and additions to the recovery facilities are expensed as incurred as no proven or probable reserves 
have been established for these uranium projects. 

Business combinations 

Business combinations are accounted for using the acquisition method whereby acquired assets and liabilities are recorded at fair 
value as of the date of acquisition with any excess of the purchase consideration over such fair value being recorded as goodwill. 
If the fair value of the net assets acquired exceeds the purchase consideration, the difference is recognized immediately as a gain 
in the consolidated statement of operations. 

Mining assets, which include mineral properties and rights, operating mines and recovery facilities, are recorded at fair value and 
includes estimated values of the mining assets beyond proven and probable reserves as well as the Company’s estimate of future 
market prices of uranium. The estimated cash flow used to value the mining assets for operating properties and recovery facilities 
include the estimated cash outflows required to develop, extract and recover the value beyond proven and probable reserves. 

Non-controlling interest in an acquisition may be measured at either fair value or at the non-controlling interest’s proportionate 
share of the fair value of the acquiree’s net identifiable assets. The acquisition date is the date the Company acquires control over 
the acquiree. The Company considers all relevant facts and circumstances in determining the acquisition date. 

Acquisition related costs, other than costs to issue debt or equity securities of the acquirer, including investment banking fees, 
legal fees, accounting fees, change in control payments, valuation fees and other professional or consulting fees are expensed as 
incurred. 

Impairment of assets 

The Company reviews and evaluates its long-lived assets for impairment when events or changes in circumstances indicate that 
the related carrying amounts may not be recoverable. Mineral properties are monitored for impairment based on factors such as 
mineral prices, government regulation and taxation, the Company's continued right to explore the area, exploration reports, assays, 
technical reports, drill results and its continued plans to fund exploration programs on the property. 

At each reporting date, the Company reviews its assets to determine whether there is any indication of impairment. If any such 
indication exists, the asset is tested for impairment. Impairment losses are recognized in profit or loss. 

Recoverability is measured by comparing the undiscounted future net cash flows to the net book value. When the net book value 
exceeds future net undiscounted cash flows, the fair value is compared to the net book value and an impairment loss may be 
measured and recorded based on the excess of the net book value over fair value. Fair value for operating mines is determined 
using a combined approach, which uses a discounted cash flow model for the existing operations and non-operating properties 

143 

 
with available cash flow models and a market approach for the fair value assessment of non-operating and exploration properties 
where no cash flow model is available. Future cash flows are estimated based on quantities of recoverable mineralized material, 
expected uranium prices (considering current and historical prices, trends and estimates), production levels, operating costs, capital 
requirements and reclamation costs, all based on life-of-mine plans. In estimating future cash flows, assets are grouped at the 
lowest level, for which there are identifiable cash flows that are largely independent of future cash flows from other asset groups. 
The Company's estimates of future cash flows are based on numerous assumptions and it is possible that actual future cash flows 
will be significantly different than the estimates, as actual future quantities of recoverable minerals, uranium prices, production 
levels, costs and capital are each subject to significant risks and uncertainties. 

Cash and cash equivalents 

Cash and cash equivalents consist of all cash balances and highly liquid investments with an original maturity of three months or 
less. Because of the short maturity of these investments, the carrying amounts approximate their fair value. Restricted cash is 
excluded from cash and cash equivalents and is included in other current or long-term assets, depending on the nature of the 
restriction. 

Investments 

The Company accounts for investments over which the Company exerts significant influence, but not control, over the financial 
and operating policies through the fair value option of ASC Topic 825 – Financial Instruments. The cost of such investments is 
measured at the fair value of the assets given up, shares issued or liabilities assumed at the date of acquisition plus costs directly 
attributable to the acquisition. Subsequent to initial recognition, they are measured at fair value and changes therein, are recognized 
in earnings. 

Unrealized gains and losses on transactions between the Company and its associates are eliminated to the extent of the Company’s 
interest in its associates. 

Inventories 

Expenditures related to the extraction and recovery of uranium concentrates and depreciation of the acquisition cost of the Extracting 
and Recovery Operations are inventoried as stockpiles and in-process and concentrate inventories. 

Stockpiles are comprised of uranium bearing  materials that have been extracted from properties and are available  for further 
processing. Extraction costs are added to the stockpile as incurred and removed from the stockpile based upon the average cost 
per ton of material extracted. The current portion of material in stockpiles represents the amount expected to be processed in the 
next twelve months. 

In-process and concentrate inventories include the cost of the material processed from the stockpile, as well as production costs 
incurred to extract uranium bearing fluids from the wellfields, and all costs to recover the uranium into concentrates or process 
through the White Mesa Mill. Finished uranium concentrate inventories also include costs of any finished product purchased from 
the market. Recovery costs typically include labor, chemical reagents and directly attributable mill and plant overhead expenditures. 

Materials and other supplies held for use in the recovery of uranium concentrates are added to the costs of inventories when 
consumed in the uranium extraction process. 

Inventories are valued at the lower of average cost or net realizable value. 

Plant and equipment 

a. 

Recognition and measurement 

Plant and equipment are measured at cost less accumulated depreciation, and any accumulated impairment losses. Cost includes 
expenditures that are directly attributable to the acquisition of the asset. Subsequent costs are included in the asset’s carrying 
amount or recognized as a separate asset, when it is replaced, and the cost of the replacement asset is expensed. 

b. 

Depreciation and amortization 

Depreciation and amortization are calculated on a straight line basis to their estimated residual value over an estimated useful life 
which ranges from 3 to 15 years depending upon the asset type. When assets are retired or sold, the resulting gains or losses are 
reflected in current earnings as a component of other income or expense. Residual values, method of depreciation and useful lives 
of the assets are reviewed at least annually and adjusted if appropriate. 

Where straight-line depreciation is utilized, the range of useful lives for various asset classes is generally as follows: 

144 

 
• 
• 
• 
• 
• 
• 

Buildings 
Shop tools and equipment 
Mining equipment 
Office equipment 
Furniture and fixtures 
Light trucks & utility vehicles 

15 years 
3-5 years 
5 years 
4-5 years 
5-7 years 
5 years 

The amortization method, residual values, and useful lives of plant and equipment are  reviewed annually, and any change in 
estimate is applied prospectively. 

Intangible assets 

Sales contracts acquired in a business combination are recognized initially at fair value at the acquisition date. The Company’s 
intangible assets are recorded at cost less accumulated amortization. 

Amortization is recorded as the Company sells inventory under its long-term sales contracts based on units sold, and is recognized 
in the statement of operations. 

Non-operating assets 

Non-operating assets consist of mineral properties and rights, along with data and analyses related to the properties, which are in 
various stages of evaluation and permitting. Costs to acquire the non-operating assets are capitalized at cost or fair value if such 
assets were a part of a business combination. 

Mining  activities  for  non-operating  assets  involve  the  search  for  minerals,  the  determination  of  technical  feasibility  and  the 
assessment of commercial viability of an identified resource. Expenditures incurred in relation to such mining activities include 
costs  which  are  directly  attributable  to  researching  and  analyzing  existing  exploration  data;  conducting  geological  studies, 
exploratory drilling and sampling; examining and testing extraction and treatment methods; and completing pre-feasibility and 
feasibility studies. Such expenditures are expensed as incurred. 

Mineral properties, that are not held for production, and any related surface  access to the minerals generally require periodic 
payments and/or certain expenditures related to the property in order for the Company to retain its interest in the mineral property 
(collectively, “Holding Costs”). The Company expenses all Holding Costs in the period they are incurred. 

Stand-by properties 

Stand-by properties are mineral properties that have extracted mineral resources in the past but are currently non-operating or 
properties which could extract mineral resources in the future. Expenditures related to these properties are primarily related to 
maintaining the  assets  and  permits in  a  condition that  will allow  re-start  of  the operations  or  development  given appropriate 
commodity prices. All costs related to stand-by assets are expensed as incurred. 

The White Mesa Mill operates on a campaign basis. When the White Mesa Mill is not recovering material, all related costs are 
expensed as incurred. 

Asset retirement obligations 

The Company’s asset retirement obligation (“ARO”) relates to expected mine, wellfield, plant and mill reclamation and closure 
activities, as well as costs associated with reclamation of exploration drilling. The Company’s activities are subject to numerous 
governmental laws and regulations. Estimates of future reclamation liabilities for ARO are recognized in the period when such 
liabilities are incurred. These estimates are updated on a periodic basis and are subject to changing laws, regulatory requirements, 
changing technology and other factors which will be recognized when appropriate. Liabilities related to site restoration include 
long-term treatment and monitoring costs and incorporate total expected costs net of recoveries. Expenditures incurred to dismantle 
facilities, restore and monitor closed resource properties are charged against the related AROs. 

As the Company has no proven or probable reserves, such costs, discounted to their present value, are expensed as soon as the 
obligation to incur such costs arises. The present value of AROs is measured by discounting the expected cash flows using a 
discount  factor  that  reflects  the  credit-adjusted  risk  free  rate  of  interest,  while  taking  into  account  an  inflation  rate.  The 
decommissioning liability is accreted to full value over time through periodic accretion charges recorded to operations as accretion 
expense. The Company adjusts the estimate of the ARO for changes in the amount or timing of underlying future cash outflows. 
The impact of these adjustments to the ARO amounts are expensed as incurred. 

145 

 
 
Loans and borrowings 

The Company's convertible debentures are recognized at fair value through the fair value option based on the closing price on the 
TSX and changes are recognized in earnings. The Company’s interest-bearing loans and borrowings are measured at amortized 
cost using the effective interest method. 

Warrant liabilities 

The Company issued several tranches of warrants for various equity transactions in 2016. The Company accounts for its warrants 
issued in accordance with the U.S. GAAP accounting guidance under FASB ASC Topic 815 Derivative and Hedging ("ASC 815") 
which requires instruments within its scope to be recorded on the balance sheet as either an asset or liability measured at its fair 
value, with changes in fair value recognized in earnings. In accordance with ASC 815, the Company has classified the warrants 
as liabilities. The warrants are subject to re-measurement at each balance sheet date, with any change in fair value recognized as 
a component of other income (expense), net in the statements of operations. The Company estimates the fair value of these warrants 
using market prices, if available or the Black-Scholes option pricing model. The Black-Scholes option pricing model is based on 
the estimated market value of the underlying common stock at the measurement date, the remaining contractual term of the warrant, 
risk-free interest rates and expected dividends on, and expected volatility of the price of the underlying common stock. 

Revenue 

a. 

Sale of goods 

Revenue  from  the  sale  of  mineral concentrates  is recognized  when  it is probable  that the  economic  benefits  will  flow  to the 
Company and delivery has occurred, title has transferred, the sales price and costs incurred with respect to the transaction can be 
measured reliably, and collectability is reasonably assured. For uranium concentrates, revenue is typically recognized when delivery 
is evidenced by book transfer at the applicable uranium storage facility. For vanadium related products, revenue is recognized at 
the time of shipment, which is when title is transferred to the customer. 

b. 

Rendering of services 

Revenue from toll milling services is recognized as material is processed in accordance with the specifics of the applicable toll 
milling agreement. Revenue and unbilled accounts receivable are recorded as related costs are incurred using billing formulas 
included in the applicable toll milling agreement. 

Revenue from alternate feed process milling is recognized as material is processed, in accordance with the specifics of the applicable 
processing agreement. Deferred revenues represent proceeds received on delivery of alternate feed materials but in advance of 
the required processing activity.  The Company does not have any obligation to process this material in 2018. 

Share-based compensation 

The Company records share based compensation awards exchanged for employee services at fair value on the date of the grant 
and expenses the awards in the consolidated statement of operations over the requisite employee service period in capital stock. 
The fair value of stock options is determined using the Black-Scholes valuation model. The fair value of restricted stock units 
(“RSUs”) is based on the Energy Fuels' stock price on the date of grant. Stock based compensation expense related to awards with 
only service conditions has a graded vesting schedule which are recorded on a straight-line basis over the requisite service period 
for each separately vesting portion of the award as if the award was, in substance, multiple awards, while all other awards are 
recognized on a straight-line basis. The Company's estimates may be impacted by certain variables including, but not limited to, 
stock  price  volatility,  employee  stock  option  exercise  behaviors,  additional  stock  option  grants,  estimates  of  forfeitures,  the 
Company's performance, and related tax impacts. 

Foreign currency 

Transactions in foreign currencies are translated to the respective functional currency of the Company’s subsidiaries and joint 
ventures at exchange rates at the dates of the transactions. Monetary assets and liabilities denominated in foreign currencies are 
translated to the functional currency at the exchange rate as of the reporting date. Non-monetary assets and liabilities that are 
measured at fair value in a foreign currency are translated to the functional currency at the exchange rate when the fair value was 
determined. Foreign currency differences are generally recognized in profit or loss. Non-monetary items that are measured based 
on historical cost in a foreign currency are not translated. 

The assets and liabilities of entities  whose functional currency is not the U.S. dollar are translated into the U.S. dollar at the 
exchange rate as of the reporting date. The income and expenses of such entities are translated into the U.S. dollar using average 
exchange rates for the reporting period. Exchange differences on foreign currency translations are recorded in other comprehensive 
income (loss). The Company’s functional currency is the U.S. dollar. 

146 

 
Income taxes 

The Company uses the asset and liability method of accounting for income taxes. Under this method, deferred income tax assets 
and liabilities are recorded based on differences between the financial statement carrying values of existing assets and liabilities 
and their respective income tax bases (temporary differences), and losses carried forward. Deferred income tax assets and liabilities 
are measured using the enacted tax rates which will be in effect when the temporary differences are likely to reverse. The effect 
on deferred income tax assets and liabilities of a change in tax rates is included in operations in the period in which the change is 
enacted. 

The Company records a valuation allowance to reduce deferred income tax assets to the amount that is believed more likely than 
not to be realized. When the Company concludes that all or part of the deferred income tax assets are not realizable in the future, 
the Company makes an adjustment to the valuation allowance that is charged to income tax expense in the period such determination 
is made. 

Net loss per share 

The Company presents basic and diluted loss per share data for its common shares, calculated by dividing the loss attributable to 
common shareholders of the Company by the weighted average number of common shares outstanding during the period. Diluted 
loss per share is determined by adjusting the loss attributable to common shareholders and the weighted average number of common 
shares outstanding for the effects of all potential dilutive instruments. 

Fair value of financial instruments 

Fair value accounting utilizes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. 
The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets and liabilities (Level 1 
measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy 
are described below: 

Level 1 - Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted 

assets or liabilities 

Level 2 - Quoted prices in markets that are  not active, or inputs that are observable, either directly or indirectly, for 

substantially the full term of the asset or liability; and 

Level 3 - Prices or valuation techniques that require inputs that are both significant to the fair value measurement and 

unobservable (supported by little or no market activity). 

Our financial instruments include cash and cash equivalents, restricted cash, accounts receivable, accounts payable and current 
accrued liabilities. These instruments are carried at cost, which approximates fair value due to the short-term maturities of the 
instruments. Allowances for doubtful accounts are recorded against the accounts receivable balance to estimate net realizable 
value. The fair value of the Company's debentures are measured at fair value based on the closing price on the TSX (a Level 1 
measurement) and changes are recognized in earnings 

Recently Issued Accounting Pronouncements not yet adopted 

The FASB has issued the following standards which are not yet effective: 

Investments 

In January 2016, ASU No. 2016-01 was issued related to financial instruments. The new guidance requires entities to measure 
equity investments that do not result in consolidation and are not accounted for under the equity method at fair value and recognize 
any changes in fair value in net income. This new guidance also updates certain disclosure requirements for these investments. 
This update is effective in fiscal years, including interim periods, beginning after December 15, 2017, and early adoption is not 
permitted. The Company is currently evaluating this guidance and the impact it will have on the financial statements. 

Leases 

In February 2016, the FASB issued ASU 2016-02 which core principle is that a lessee should recognize the assets and the liabilities 
that arise from leases, including operating leases. Under the new requirements, a lessee will recognize in the balance  sheet a 
liability to make lease payments (the lease liability) and the right-of-use asset representing the right to the underlying asset for the 
lease term. For leases with a term of twelve months or less, the lessee is permitted to make an accounting policy election by class 
of underlying asset not to recognize lease assets and lease liabilities. The recognition, measurement, and presentation of expenses 
and cash flows arising from a lease by a lessee have not significantly changed from the previous GAAP. The standard is effective 
for fiscal years beginning after December 15, 2018, including interim periods within such fiscal year, with early adoption permitted. 

147 

 
The ASU requires a modified retrospective transition method with the option to elect a package of practical expedients. The 
Company is evaluating the effect of this amendment and the impact it will have on the Company’s financial statements. 

Revenue recognition 

In May 2014, the FASB issued ASU No. 2014-09, as amended by ASU No. 2016-12, "Revenue from Contracts with Customers 
(Topic 606)," which requires revenue to be recognized based on the amount an entity is expected to be entitled to for promised 
goods or services provided to customers. The standard also requires expanded disclosures regarding contracts with customers. 
The guidance in this standard supersedes the revenue recognition requirements in Topic 605, "Revenue Recognition," and most 
industry-specific guidance. Adoption of the standard may be applied retrospectively to each prior period presented (full 
retrospective method) or retrospectively with the cumulative effect recognized as of the date of initial application (modified 
retrospective method). This guidance is effective for us beginning January 1, 2018 and we will apply the modified retrospective 
method. Accordingly, for our public filings beginning with our Quarterly Report on Form 10-Q for the quarter ending March  
31, 2018, we will present prior periods as if revenue were recognized under Topic 606. 

Our revenue is primarily generated from the sale of uranium to customers. These sales predominantly contain a single delivery 
element and revenue is recognized at a single point in time when ownership, risk and rewards transfer to the buyer. 

The Company is finalizing the analysis of the effects of ASU 2014-09 on the consolidated financial statements, and subject to 
completion of this analysis, the Company expects to record a cumulative effect of adoption adjustment as of January 1, 2018 to 
decrease accumulated deficit earnings by approximately $2.50 million, reflecting the gross profit the Company would have 
recognized under ASU 2014-09 if applied as of December 31, 2017. In addition to accelerating the timing of recording revenue, 
the Company expects a corresponding decrease in deferred revenue.  The Company is in the process of implementing and 
refining the required changes to its business and accounting processes, and internal controls to support recognition and 
disclosures under the new standard. 

4. 

ACQUISITION OF THE ALTA MESA ISR PROJECT 

On June 16, 2016, the Company acquired 100% of the membership interests of EFR Alta Mesa LLC (“Alta Mesa”) (formerly 
named “Mesteña Uranium, LLC”) and its related companies, together referred to as “Alta Mesa”. Under the terms of the acquisition 
agreement, the sellers of Alta Mesa received 4,551,284 common shares of the Company. 

Alta Mesa’s primary asset is the Alta Mesa ISR Project (the “Alta Mesa Project”) located in Texas. The Alta Mesa Project is a 
fully-permitted and licensed production facility that is not currently operating. The acquisition was accounted for as a purchase 
of assets as Alta Mesa did not meet the definition of a business under ASC Topic 805, Business Combinations because the assets 
in Alta Mesa do not have developed wellfields which are a key process for extraction of uranium. The development can only 
commence once uranium prices improve and economic feasibility of the Alta Mesa Project is established. The measurement of 
the purchase consideration was based on the market price of the Company's common stock on June 16, 2016 of $2.50 per share. 
The total transaction costs incurred through June 30, 2016 by the Company were $1.29 million which were capitalized as part of 
the purchase consideration. 

The aggregate fair values of assets acquired and liabilities assumed were as follows on the acquisition date: 

Issuance of 4,551,824 common shares 
Transaction costs 

Purchase consideration 

The purchase price was allocated as follows: 

Plant and equipment (a) 
Inventories 

Restricted cash 

Accounts payable and accrued liabilities 

Asset retirement obligation 

Net identifiable assets 

$ 

$ 

$ 

11,378 
1,290 

12,668 

13,626 
177 

4,532 

(213) 

(5,454) 

$ 

12,668 

(a) 

The plant and equipment includes the value ascribed to the processing plant and equipment. The mineral properties, which 
were acquired as part of the acquisition of Alta Mesa in 2016, do not have proven and probable reserves under SEC 

148 

 
 
 
 
 
 
 
Industry Guide 7. Accordingly, all subsequent expenditures at the Alta Mesa Project and equipment, which do not have 
any alternative use, and expenditures on mineral properties will be expensed as incurred. 

5. ACQUISITION OF URANERZ ENERGY CORPORATION 

On June 18, 2015, the Company acquired 100% of the outstanding shares of Uranerz Energy Corporation. Under the terms of the 
acquisition agreement, shareholders of Uranerz received 0.255 common shares of the Company for each share of Uranerz common 
stock held. Each outstanding Uranerz option or warrant was converted into an option or warrant (as applicable) to acquire common 
shares of the Company, on the same terms and conditions as were applicable to the stock option or warrant (as applicable) prior 
to the acquisition, except that the number of shares subject to the option or warrant and the exercise price of the option or warrant 
were adjusted based on the exchange ratio of 0.255, so as to preserve the economic value of such options or warrants. 

Uranerz, now a wholly owned subsidiary of the Company, is a United States-based uranium company focused on in-situ uranium 
recovery. ISR is a uranium extraction process that uses a “leaching solution” to extract uranium from underground sandstone- 
hosted uranium resources and then recover the uranium in the form of uranium concentrates. Uranerz controls a land position in 
the central Powder River Basin in Wyoming, where it operates the Nichols Ranch Project. The acquisition of Uranerz provided 
the Company with ISR capabilities and the capability to expand ISR extraction and recovery in the future. 

The acquisition was accounted for using the acquisition method in accordance with ASC Topic 805, Business Combinations, with 
the Company being identified as the acquirer. The measurement of the purchase consideration was based on the market price of 
the Company's common stock on June 18, 2015 which was $4.16 per share. The total purchase price, including the fair value of 
the options and warrants, amounted to $106.34 million. The total transaction costs incurred through December 31, 2015 by the 
Company were $6.89 million which were recorded in Costs directly attributable to acquisitions and are comprised of cash costs 
of $2.96 million and the issuance of 889,436 common shares of the Company for a total value of $3.93 million for advisory fees 
and to settle a portion of required change in control payments to certain employees of Uranerz. 

The final allocation of the purchase price, based on the fair value of assets acquired and liabilities assumed on June 18, 2015, is 
summarized in the following table: 

Purchase price 

Issuance of 24,457,773 common shares for replacement of Uranerz common shares 
Issuance of 2,690,250 warrants for replacement of Uranerz warrants (Note 12) 

Issuance of 2,040,408 options for replacement of Uranerz share based options (Note 12) 

Uranerz purchase price allocation 
Cash and cash equivalents 
Inventories 

Prepaid expenses and other assets 

Plant and equipment 

Mineral properties 

Intangible assets - customer contracts 

Restricted cash 

Accounts payable and accrued liabilities 

Loans and borrowings 

Asset retirement obligation 

Non-controlling interest 

Goodwill 

Total purchase consideration 

$ 

$ 

$ 

101,744 
915 

3,681 

106,340 

2,459 
3,742 

402 

29,974 

36,563 

10,600 

2,100 

(2,280) 

(18,813) 

(2,145) 

(3,992) 

47,730 

$ 

106,340 

The purchase consideration was allocated to the fair value of assets acquired and liabilities assumed, based on an independent 
valuation report and management's best estimates. 

149 

 
 
 
 
 
 
 
 
6. RECEIVABLES 

Current 
Trade receivables - other 
Notes receivable, net 

Non-current 
Notes receivable and other 

December 31, 2017  December 31, 2016 

$ 

$ 

$ 
$ 

403 
850  $ 

1,253  $ 

$ 
903 
903  $ 

364 
— 

364 

1,146 
1,146 

During the year ended December 31, 2014 the Company received two notes with the principal totaling $1.05 million due in 2018 
in connection with the sale of certain assets previously recorded as held for sale. These notes carry a 3% annual interest payment. 
The Company has setup a reserve of $0.22 million as of December 31, 2017 (2016 - $0.22 million) against the collectability of 
these receivables. 

7. 

INVENTORIES 

Concentrates and work-in-progress (a) 
Raw materials and consumables 

December 31, 2017 

December 31, 2016 

$ 

$ 

14,118  $ 

2,432 

16,550  $ 

13,788 
2,973 

16,761 

(a) 

For the year ended December 31, 2017, the Company recorded an impairment loss of $3.31 million in the statement of 
operations related to concentrates and work in progress inventories (December 31, 2016 - $5.36 million). 

8. INTANGIBLE ASSETS 

The following is a summary of changes in intangible assets related to favorable sales contracts acquired in business combinations 
for the years ended December 31, 2017 and December 31, 2016: 

Sales Contracts 

Cost 
Balance at beginning of period 

Sales contracts fulfilled 

Balance, end of period 
Accumulated amortization, beginning of period 

Amortization of sales contracts 

Sales contracts fulfilled 

Accumulated amortization, end of period 
Net book value 

December 31, 
2017 

December 31, 
2016 

$ 

15,034  $ 

(4,435) 

10,599 
9,235 

3,297 

(4,435) 

$ 

8,097 
2,502  $ 

18,657 

(3,623) 

15,034 
9,540 

3,318 

(3,623) 

9,235 
5,799 

The sales contracts when acquired were recorded at their acquisition date fair value, which are the incremental cash flows 
available to the Company arising from above-market pricing of the contracts. Amortization expense for 2018 will be $2.50 
million. 

150 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9. 

PLANT AND EQUIPMENT AND MINERAL PROPERTIES 

The following is a summary of plant and equipment: 

December 31, 2017 

December 31, 2016 

Cost 

Accumulated 
Depreciation 

Net Book 
Value 

Cost 

Accumulated 
Depreciation 

Net Book 
Value 

Plant and equipment 

Nichols Ranch 

$           29,210    $ 

(9,971)   $           19,239    $           29,210    $ 

(6,804)   $           22,406 

Alta Mesa 

Equipment and other 
Plant and equipment 
total 

13,626 

13,367 

(1,388) 

(11,768) 

12,238 

1,599 

13,626 

13,367 

(456) 

(11,361) 

13,170 

2,006 

$           56,203    $         (23,127)   $           33,076    $           56,203    $         (18,621)   $           37,582 

The net book value for Nichols Ranch Project includes the value beyond proven and probable reserves ascribed to the processing 
plant, the Nichols Ranch wellfields and the Jane Dough project upon acquisition. 

For the year ended December 31, 2017, the Company recorded $3.17 million (2016 - $4.43 million) of depreciation expense related 
to  Nichols  Ranch,  which  is  included  in  the  costs  and  expenses  applicable  to  revenue  in  the  Statement  of  the  operations  and 
comprehensive income for the year ended December 31, 2017. 

The following is a summary of mineral properties: 

Mineral properties 

Uranerz ISR properties (a) 

Sheep Mountain 

Roca Honda (b) 

Other (a) 

Mineral properties total 

December 31, 2017  December 31, 2016 

$ 

$ 

25,974  $ 
34,183 

22,095 

1,287 

83,539  $ 

35,060 

34,183 

22,095 

1,287 

92,625 

a) 

b) 

In the year ended December 31, 2017 the Company did not renew certain mineral leases and recorded abandonment 
expense of $0.29 million (December 31, 2016 – $1.04 million, December 31, 2015 – $2.77 million) in the statement of 
operations. 

On May 27, 2016, the Company issued 1,212,173 shares to acquire the remaining 40% interest of the Roca Honda 
project for consideration of $2.63 million and an additional $4.5 million in cash payable upon first commencement of 
commercial mineral extraction. The acquisition was accounted for as a purchase of assets as Roca Honda does not 
meet the definition of a business under FASB ASC Topic 805, Business Combinations because Roca Honda does not 
currently have the resources, both inputs and processes, to apply to the Roca Honda property in order to extract 
uranium. 

10. IMPAIRMENTS 

Impairment of goodwill 

In the year ended December 31, 2015, the Company recorded goodwill of $47.73 million associated with the acquisition of Uranerz 
on June 18, 2015. The goodwill represents the excess of the acquisition date fair value of the purchase consideration, over the fair 
value of the assets acquired, net of obligations assumed, and is ascribed to the ISR reporting unit. 

In the period following the acquisition of Uranerz to December 31, 2015, uranium spot market prices had fallen approximately 
20% and the value of the Company’s shares and related market capitalization had decreased significantly. As a result, during the 
Company’s annual impairment test for goodwill performed as of December 31, 2015 the Company evaluated the carrying amount 
of the goodwill and determined that the goodwill should be fully impaired at December 31, 2015 (refer to note 21 for disclosure 
of the Company’s valuation methodology). 

151 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Impairment of plant and equipment, mineral properties and mineral properties held for sale 

The Company conducts a review of potential triggering events for all its mineral properties on a quarterly basis. When events or 
changes in circumstances indicate that the related carrying amounts may not be recoverable, the Company carries out a review 
and evaluation of its long-lived assets in accordance with its accounting policy.  No such events or changes in circumstances were 
noted in the year ended December 31, 2017. 

In the year ended December 31, 2017 the Company entered into an agreement to sell certain non-core uranium properties.  The 
Company reclassifed these properties as held for sale and recorded an impairment of $3.80 million. The impaired properties are 
in the Reno Creek area. The impairment was based of the estimate of its fair value determined using the market approach less 
estimated selling costs. 

In the year ended December 31, 2015, the Company identified indicators of impairment of its mineral properties due to the decline 
in the uranium concentrate spot and long-term prices and deterioration in the Company’s expectation of future uranium concentrate 
prices with respect to the Company's mineral properties. An impairment analysis was performed for these properties using the 
assumptions listed in note 21. The Company compared the undiscounted cash flows for the mineral properties tested with their 
carrying amounts. No impairment was considered necessary with respect of Roca Honda, Sheep Mountain properties and the ISR 
mineral properties, since the undiscounted cash flows exceeded the carrying amounts for the properties. With respect of mineral 
properties identified as held for sale the Company recorded an impairment totaling $8.22 million. The impaired properties included 
Copper King, Marquez Ranch, Gas Hills, Juniper Ridge and the Nose Rock. These properties are classified in the other category 
of the conventional segment. The impairment was based of the estimate of its fair value determined using the market approach 
less estimated selling costs. In 2016, the Copper King, Marquez Ranch and Nose Rock mineral interests with a carrying amount 
of $1.30 million were sold in separate transactions for gross proceeds totaling $1.36 million. 

11. 

ASSET RETIREMENT OBLIGATIONS AND RESTRICTED CASH 

The following table summarizes the Company’s asset retirement obligations: 

Asset retirement obligation, beginning of period 
Revision of estimate 

Acquired in asset acquisitions or business combinations 

Accretion of liabilities 

Settlements 

Asset retirement obligation, end of period 

Asset retirement obligation: 
Current 
Non-current 

Asset retirement obligation, end of period 

December 31, 2017 

December 31, 2016 

$ 

$ 

$ 

$ 

17,033  $ 
249 

— 

1,733 

(735) 

18,280  $ 

$ 

32 
18,248 

18,280  $ 

8,573 
4,186 

5,454 

906 

(2,086) 

17,033 

32 
17,001 

17,033 

The  asset  retirement  obligations  of  the  Company  are  subject  to  legal  and  regulatory  requirements.  Estimates  of  the  costs  of 
reclamation are reviewed periodically by the Company and the applicable regulatory authorities. The above provision represents 
the Company’s best estimate of the present value of future reclamation costs, discounted using credit adjusted risk-free interest 
rates ranging from 9.5% to 11.5% and an inflation rate of 2.0%. The total undiscounted decommissioning liability at December 31, 
2017 is $43.46 million. 

The following table summarizes the Company’s restricted cash: 

Restricted cash, beginning of period 

Restricted cash from acquisitions 

Refunds of collateral 

Additional collateral posted 

Restricted cash, end of period 

December 31, 2017  December 31, 2016 

$ 

$ 

23,175  $ 

— 

(14,657) 

13,609 

22,127  $ 

12,980 

4,532 

— 

5,663 

23,175 

152 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Company has cash, cash equivalents and fixed income securities as collateral for various bonds posted in favor of the applicable 
state regulatory agencies in Arizona, Colorado, New Mexico, Texas, Utah and Wyoming, and the U.S. Bureau of Land Management 
and U.S. Forest Service for estimated reclamation costs associated with the White Mesa Mill, Nichols Ranch, Alta Mesa and other 
mining properties. Cash equivalents are short-term highly liquid investments with original maturities of three months or less. The 
restricted cash  will be released when the Company  has reclaimed a mineral property or restructured the surety and collateral 
arrangements. See Note 18 for a discussion of the Company’s surety bond commitments. 

12. 

LOANS AND BORROWINGS 

The contractual terms of the Company’s interest-bearing loans and borrowings, which are recorded at amortized cost, and the 
Company’s convertible debentures which are recorded at fair value, are as follows. 

Current portion of loans and borrowings: 

Convertible debentures (a) 
Wyoming Industrial Development Revenue Bond loan (b) 

Total current loans and borrowings 
Long-term loans and borrowings: 

Convertible debentures (a) 
Wyoming Industrial Development Revenue Bond loan (b) 

Total long-term loans and borrowings 

Terms and debt repayment schedule 

Terms and conditions of outstanding loans were as follows: 

December 31, 2017  December 31, 2016 

$ 

$ 

$ 

$ 

  —    $ 
3,414 

3,414    $ 

16,636    $ 
7,441 

24,077    $ 

3,095 
3,224 

6,319 

12,381 
10,854 

23,235 

Convertible debentures (a) 

CDN$ 

8.5% 

2020 

$16,636 

$16,636 

$16,385 

Currency 

Nominal 
interest rate 

Year of 
maturity 

Face value 

Carrying 
amount 

Face value 

Carrying 
amount 

$15,476 

December 31, 2017 

December 31, 2016 

Wyoming Industrial 
Development Revenue Bond 
loan (b) 

USD 

5.8% 

2020 

10,855 

$27,491 

10,855 

$27,491 

14,078 

$30,463 

14,078 

$29,554 

On July 24, 2012, the Company completed a bought deal public offering of 22,000 floating-rate convertible 
(a) 
unsecured subordinated debentures originally maturing June 30, 2017 (the “Debentures”) at a price of Cdn$1,000 per 
Debenture for gross proceeds of Cdn$21.55 million (the “Offering”). The Debentures are convertible into common shares 
at the option of the holder. Interest is paid in cash and in addition, unless an event of default has occurred and is continuing, 
the Company may elect, from time to time, subject to applicable regulatory approval, to satisfy its obligation to pay 
interest on the Debentures, on the date it is payable under the indenture: (i) in cash; (ii) by delivering sufficient common 
shares to the debenture trustee, for sale, to satisfy the interest obligations in accordance with the indenture in which event 
holders of the Debentures will be entitled to receive a cash payment equal to the proceeds of the sale of such common 
shares; or (iii) any combination of (i) and (ii). 

On August 4, 2016, the Company, by a vote of the Debentureholders, extended the maturity date of the Debentures from 
June 30, 2017 to December 31, 2020, and reduced the conversion price of the Debentures from Cdn$15.00 to Cdn$4.15 
per common share of the Company. In addition, a redemption provision was added that enables the Company, upon giving 
not less than 30 days' notice to Debentureholders, to redeem the Debentures, for cash, in whole or in part at any time 
after June 30, 2019, but prior to maturity, at a price of 101% of the aggregate principal amount redeemed, plus accrued 
and unpaid interest (less any tax required by law to be deducted) on such Debentures up to but excluding the redemption 
date. A right (in favor of each Debentureholder) was also added to give the Debentureholders the option to require the 
Company to purchase, for cash, on the previous maturity date of June 30, 2017, up to 20% of the Debentures held by the 

153 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Debentureholders at a price equal to 100% of the principal amount purchased plus accrued and unpaid interest (less any 
tax required by law to be deducted). 

The Debentures accrue interest, payable semi-annually in arrears on June 30 and December 31 of each year at a fluctuating 
rate of not less than 8.5% and not more than 13.5%, indexed to the simple average spot price of uranium as reported on 
the UxC Weekly Indicator Price. The Debentures may be redeemed in whole or part, at par plus accrued interest and 
unpaid interest by the Company between June 30, 2019 and December 31, 2020 subject to certain terms and conditions, 
provided the volume weighted average trading price of the common shares of the Company on the TSX during the 20 
consecutive trading days ending five days preceding the date on which the notice of redemption is given is not less than 
125% of the conversion price. 

Upon redemption or at maturity, the Company will repay the indebtedness represented by the Debentures by paying to 
the debenture trustee in Canadian dollars an amount equal to the aggregate principal amount of the outstanding Debentures 
which are to be redeemed or which have matured, as applicable, together with accrued and unpaid interest thereon. 

Subject to any required regulatory approval and provided no event of default has occurred and is continuing, the Company 
has the option to satisfy its obligation to repay the Cdn$1,000 principal amount of the Debentures, in whole or in part, 
due at redemption or maturity, upon at least 40 days’ and not more than 60 days’ prior notice, by delivering that number 
of common shares obtained by dividing the Cdn$1,000 principal amount of the Debentures maturing or to be redeemed 
as applicable, by 95% of the volume-weighted average trading price of the common shares on the TSX during the 20 
consecutive trading days ending five trading days preceding the date fixed for redemption or the maturity date, as the 
case may be. 

In accordance with the revised terms approved on August 4, 2016, the Company had classified 20% of the principal 
amount of the Debenture as a current liability at December 31, 2016. Upon expiration of the option at June 30, 2017, the 
Company reclassified the amount not redeemed as a long term liability. The Debentures are classified as fair value through 
profit  or  loss  where  the  Debentures  are  measured  at  fair  value  based  on  the  closing  price  on  the  TSX  (a  Level  1 
measurement) and changes are recognized in earnings. For the year ended December 31, 2017 the Company recorded a 
loss on revaluation of convertible debentures of $0.94 million (December 31, 2016 – $0.41 million). 

The Company, upon its acquisition of Uranerz, assumed a loan through the Wyoming Industrial Development 
(b) 
Revenue Bond program (the "Loan"). The Loan has an annual interest rate of 5.75% and is repayable over seven years, 
maturing on October 15, 2020. The Loan originated on December 3, 2013 and required the payment of interest only for 
the first year, with the amortization of principal plus interest over the remaining six years. The Loan can be repaid earlier 
than its maturity date if the Company so chooses without penalty or premium. The Loan is secured by most of the assets 
of the Company’s wholly owned subsidiary, Uranerz, including mineral properties, the processing facility, and equipment 
as well as an assignment of all of Uranerz’rights, title and interest in and to its product sales contracts and other agreements. 
Uranerz is also subject to dividend restrictions. Principal and interest are paid on a quarterly basis on the first day of 
January, April, July and October. At December 31, 2017 the loan had an outstanding balance of $10.86 million of which 
the current portion of the loan was $3.41 million. 

13. 

CAPITAL STOCK 

Authorized capital stock 

The Company is authorized to issue an unlimited number of common shares without par value, unlimited preferred shares issuable 
in series, and unlimited Series A preferred shares. The Series A preferred shares are non-redeemable, non-callable, non-voting and 
with no right to dividends. The Preferred Shares issuable in series will have the rights,  privileges, restrictions and conditions 
assigned to the particular series upon the Board of Directors approving their issuance. 

Issued capital stock 

The significant transactions relating to capital stock issued during 2017, 2016, and 2015 are: 

a) 

b) 

In the year ended December 31, 2017, the Company issued 7,202,479 common shares under the Company’s “at-the- 
market” offering (the “ATM”) for proceeds of $14.55 million. In the year ended December 31, 2016, the Company issued 
200,225 common shares under the Company’s ATM for proceeds of $0.54 million.  In the year ended December 31, 2015 
the Company issued 1,275,908 shares under the Company’s ATM for proceeds of $2.94 million. 

On March 14, 2016, the Company completed a public offering of 5,031,250 units at a price of $2.40 per unit for gross 
proceeds of $12.08 million. Each Unit consisted of one common share and one half of one common share purchase 
warrant, or a total of 5,031,250 common shares and 2,515,625 warrants. Each warrant is exercisable until March 14, 2019 
and entitles the holder thereof to acquire one common share upon exercise at an exercise price of US$3.20 per common 

154 

 
 
 
share. These warrants are accounted for as a derivative liability, as the functional currency of the entity issuing the warrant 
is Cdn$. 

The following weighted average assumptions were used for the Black-Scholes option pricing model to calculate the $2.09 
million of fair value for the 2,515,625 warrants issued in connection with the public offering in March 2016. 

Risk-free rate 
Expected life 
Expected volatility 
Expected dividend yield 

1.15% 
3.0 years 
106.0%* 
0% 

* Expected volatility is measured based on the Company’s historical share price volatility over the expected life of the warrants. 

c) 

d) 

e) 

On May 27, 2016, the Company issued 1,212,173 shares to acquire the remaining 40% interest of the Roca Honda Joint 
Venture for share consideration of $2.68 million. 

On June 16, 2016 the Company issued 4,551,284 shares to acquire Alta Mesa with a value of $11.38 million. 

On September 20, 2016, the Company completed a public offering of 8,337,500 units at a price of $1.80 per unit for gross 
proceeds of $15.01 million. Each Unit consisted of one common share and one half of one common share purchase 
warrant, or a total of 8,337,500 Shares and 4,168,750 Warrants. Each warrant is exercisable until September 20, 2021 
and entitles the holder thereof to acquire one common share upon exercise at an exercise price of US$2.45 per common 
share. These warrants are accounted for as a derivative liability, as the functional currency of the entity issuing the warrant 
is Cdn$. 

The following weighted average assumptions were used for the Black-Scholes option pricing model to calculate the $3.17 
million of fair value for the 4,168,750 warrants issued in connection with the public offering in September 2016. 

Risk-free rate 
Expected life 
Expected volatility 
Expected dividend yield 

1.2% 
5.0 years 
145.2%* 
0% 

* Expected volatility is measured based on the Company’s historical share price volatility over the expected life of the warrants. 

f) 

On June 18, 2015 the Company issued 24,457,773 shares for the acquisition of Uranerz Energy Corp valued at $101.74 
million. 

Pursuant to the acquisition of Uranerz, the Company issued 617,832  EFI common shares valued at $2.57  million in 
satisfaction of an advisory fee. The value of the Energy Fuels' shares issued for the advisory fee was calculated using 
the share price of the Company’s common shares on the date the acquisition closed and these costs were expensed in the 
consolidated financial statements of the Company. 

On June 25, 2015 the Company issued 271,604 EFI common shares valued at $1.36 million to former employees of 
Uranerz in consideration for termination liabilities.  The value of the Energy Fuels' shares issued was calculated using 
the share price of the Company’s shares on the date the shares were issued. These costs were expensed in the consolidated 
financial statements of the Company. 

Share Purchase Warrants 

The following table summarizes the Company’s share purchase warrants denominated in US dollars. These warrants are accounted 
for as derivative liabilities as the functional currency of the entity issuing the warrants, Energy Fuels Inc., is Canadian dollars. 

Month Issued 

March 2016 (1) 

September 2016 (2) 

Expiry Date 

March 14, 2019 

September 20, 2021 

Exercise 
Price 
USD$ 

Warrants 
Outstanding 

Fair value at 
December 31, 
2017 

3.20 

2.45 

2,515,625  $ 

4,168,750 

$ 

385 

2,991 

3,376 

(1) These US dollar based warrants are classified as Level 2 under the fair value hierarchy (Note 13). 

(2) These US dollar based warrants are classified as Level 1 under the fair value hierarchy as they are traded on an active market. 

155 

 
 
 
 
 
 
 
 
 
 
The following weighted average assumptions were used for the Black-Scholes option pricing model to calculate the $0.39 million 
of fair value for the 2,515,625 warrants at December 31, 2017. 

Risk-free rate 
Expected life 
Expected volatility 
Expected dividend yield 

1.76% 
1.2 years 
63.7%* 
0% 

* Expected volatility is measured based on the Company’s historical share price volatility over the expected life of the 
warrants. 

14. 

BASIC AND DILUTED LOSS PER COMMON SHARE 

The following is a reconciliation of weighted average shares outstanding for the years ended December 31, 2017, 2016, 2015, 
respectively: 

Issued common shares at beginning of period 

Effect of share options exercised 

Years Ended December 31, 

2017 

2016 

2015 

66,205,153 
— 

46,519,132 
3,471 

19,677,552 
22,938 

Effect of shares issued for settlement of vesting of restricted share units 

831,393 

196,242 

Effect of shares issued for exercise of share purchase warrants 

Effect of shares issued in business combinations 

Effect of shares issued in asset acquisitions 

Effect of shares issued in public offerings 

Weighted average shares outstanding 

Basic and diluted loss per share 

— 

— 

— 

3,822,561 

— 

— 

3,184,175 

6,538,038 

— 

173 

13,654,488 

— 

28,821 

70,859,107 

56,441,058 

33,383,972 

The calculation of diluted earnings per share after adjustment for the effects of all potential dilutive common shares, calculated 
as follows: 

Net loss 
Basic and diluted weighted average number 

of common shares outstanding 

Loss per common share 

Years Ended December 31, 

2017 

2016 

2015 

$ 

(27,766)  $ 

(39,413)  $ 

(82,217) 

70,859,107 

56,441,058 

33,383,972 

$ 

(0.39)  $ 

(0.70)  $ 

(2.46) 

For the three years ended December 31, 2017, 2016 and 2015, 8.71 million, 10.19 million and 5.21 million options and warrants, 
respectively, and the potential conversion of the debentures have been excluded from the calculation as their effect would have 
been anti-dilutive. 

15. 

SHARE-BASED PAYMENTS 

The  Company,  under  the  2015  Omnibus  Equity  Incentive  Compensation  Plan  (the  “Compensation  Plan”),  maintains  a  stock 
incentive plan for directors, executives, eligible employees and consultants. Stock incentive awards include employee stock options 
and restricted stock units (“RSUs”). The Company issues new shares of common stock to satisfy exercises and vesting under all 
of its stock incentive awards. At December 31, 2017, a total of 7,436,682 common shares were authorized for stock incentive plan 
awards. 

Employee Stock Options 

The Company, under the Compensation Plan may grant options to directors, executives, employees and consultants to purchase 
common shares of the Company. The exercise price of the options is set as the higher of the Company’s closing share price on the 
day before the grant date or the five-day volume weighted average price. Stock options granted under the Compensation Plan 

156 

 
 
 
 
 
 
 
 
 
 
 
 
 
generally vest over a period of two years or more and are generally exercisable over a period of five years from the grant date not 
to exceed 10 years. The value of each option award is estimated at the grant date using the Black-Scholes Option Valuation Model. 
There were 0.74 million options granted in the year ended December 31, 2017 (December 31, 2016 – 0.45 million, December 31, 
2015 - 2.17 million). At December 31, 2017, there were 2.03 million options outstanding with 1.66 million options exercisable, 
at a weighted average exercise price of $4.48 and $4.96 respectively, with a weighted average remaining contractual life of 3.59 
years. The aggregate intrinsic value of the fully vested shares was $nil. 

The summary of the Company’s stock options at December 31, 2017, 2016 and 2015, respectively, and the changes for the fiscal 
periods ending on those dates are presented below: 

Balance, January 1, 2015 
Granted 

Exercised 

Forfeited 

Expired 

Balance, December 31, 2015 
Granted 

Exercised 

Forfeited 

Expired 

Balance, December 31, 2016 
Granted 

Exercised 

Forfeited 

Expired 

Balance, December 31, 2017 

Range of Exercise 
Prices 
$ 

Weighted Average 
Exercise Price 
$ 

Number of 
Options 

7.60 - 44.22 
2.55 - 18.55 

2.55 - 4.48 

4.44 - 29.71 

7.47 - 32.10 

2.55 - 32.10 

2.12 - 2.22 

2.12 

2.12 - 18.99 

2.95 - 32.03 

2.12 - 15.61 
1.77 - 2.35 

— 

2.12 - 11.94 

4.48 - 12.55 

1.77 - 15.61 

11.66 
6.02 

3.78 

7.29 

7.42 

6.54 
2.13 

2.12 

5.52 

8.03 

5.69 
2.34 

— 

2.93 

8.42 

4.48 

905,413 
2,176,330 

(48,802) 

(574,486) 

(335,558) 

2,122,897 
449,537 

(8,369) 

(317,960) 

(200,962) 

2,045,143 
738,893 

— 

(316,289) 

(438,900) 

2,028,847 

As of December 31, 2017, the outstanding stock options denominated in Cdn$ were as follows: 

Options outstanding 
Weighted 
average 
remaining 
contractual 
life 

Weighted 
average 
price 

8.26 

1.17 

Options exercisable 
Weighted 
average 
remaining 
contractual 
life 

Weighted 
average 
price 

8.26 

1.17 

Intrinsic 
   Value  

— 

— 

$ 

Intrinsic 
   Value  

   Quantity        

— 

— 

393,100 

393,100 

$ 

   Exercise price 

Quantity        

$5.00 to $9.99 

393,100 

393,100 

As of December 31, 2017, the outstanding stock options denominated in USD$ were as follows: 

157 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Options outstanding 

Weighted 
average 
price 

Weighted 
average 
remaining   
contractual 
life 

Intrinsic 
Value 

Quantity 

Options exercisable 

Weighted 
average 
price 

Weighted 
average 
remaining 
contractual   
life 

Intrinsic 
Value 

Exercise price 

Quantity 

$0.00 to $4.99 

1,276,456  $ 

$5.00 to $9.99 

$10.00 to $14.99 

255,762 

90,779 

$15.00 to $19.99 

12,750  $ 

2.97 

6.00 

10.69 

15.61 

1,635,747   

4.49 

4.10 

0.50 

3.03 

$ 

$ 

— 
— 

— 

— 

— 

911,276  $ 
255,762 

90,779 

12,750  $ 

1,270,567   

3.24 

6.00 

10.69 

15.61 

4.73    $ 
4.10   
0.50   
3.03   

  $ 

— 

— 

— 

— 

— 

In the year ended December 31, 2016 the Company issued 8,369 shares upon exercise of stock options at an average exercise price 
of $2.12 for proceeds of $0.02 million. These options had an intrinsic value of $0.01 million. 

In the year ended December 31, 2015 the Company issued 48,802 shares upon exercise of stock options at an average exercise 
price of $3.87 for proceeds of $0.18 million. These options had an intrinsic value of $0.06 million. 

The share-based compensation recorded during the years ended months ended December 31, 2017, 2016 and 2015 is as follows: 

Share-based compensation (1)(2) 
Replacement of options from business combinations and asset acquisitions (3) 

Value of stock options and RSUs granted 

Years ended 
December 31, 
2016 

2017 

2015 

$ 

$ 

3,525  $ 
— 

2,657  $ 
— 

1,099 
3,681 

3,525  $ 

2,657  $ 

4,780 

(1)  The fair value of the options granted under the Compensation Plan for the years ended December 31, 2017, 2016 and 2015, 
was estimated at the date of grant, using the Black-Scholes Option Valuation Model, with the following weighted-average 
assumptions: 

Risk-free interest rate 
Expected life 
Expected volatility 

Expected dividend yield 

Weighted-average expected life of option 

Weighted-average grant date fair value 

2017 

2016 

2015 

1.93% 
5.0 years 

63.0%* 
0% 

5.00 

$1.20 

1.03% - 1.43% 
5.0 years 
64.7% -74.8%* 

0% 

5.00 

$1.22 - $1.23 

0.87% 
5.0 years 
75.1%* 

0% 

4.99 

2.64 

* Expected volatility is measured based on the Company’s historical share price volatility over a period equivalent to the expected 
life of the options. 

(2)  The fair value of the RSUs granted under the Compensation Plan for the years ended December 31, 2017, 2016 and 2015, 

was estimated at the date of grant, using the stated market price. 

(3)  For business combinations and asset acquisitions the Company may issue options to replace options of the acquired 

companies.  For the year ended December 31, 2015, the fair value of stock options granted to employees, directors and 
consultants of companies acquired through business combinations and asset acquisitions was estimated on the closing date 
of the transaction using the Black-Scholes option pricing model with the following assumptions: 

158 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Risk-free interest rate 

Expected life 
Expected volatility 

Expected dividend yield 

Weighted-average expected life of option 

Weighted-average grant date fair value 

0.0% to 2.35% 

0.05 years to 10 
years 
18.47 to 93.31%* 

0% 

4.52 

$1.89 

* Expected volatility is measured based on the Company’s historical share price volatility over a period equivalent to the expected 
life of the options. 

A summary of the status and activity of non-vested stock options at December 31, 2017 is as follows: 

Non-vested January 1, 2015 
Granted 
Vested 

Forfeited 

Non-vested December 31, 2015 
Granted 

Vested 

Forfeited 

Non-vested December 31, 2016 
Granted 

Vested 

Forfeited 

Non-vested December 31, 2017 

Restricted Stock Units 

Number of shares 

Weighted Average 
Grant- Date Fair 
Value 

139,600  $ 

2,176,330 
(2,119,803) 

(18,429) 

177,698 
449,537 

(331,482) 

(68,575) 

227,178 
738,893 

(486,386) 

(114,505) 

365,180  $ 

5.27 
1.93 
2.00 

5.17 

3.44 
1.29 

2.26 

1.56 

1.48 
1.18 

1.30 

1.22 

1.20 

The Company grants RSUs to executives and eligible employees. Awards are determined as a target percentage of base salary and 
vest over periods of three years. Prior to vesting, holders of restricted stock units do not have the right to vote the underlying 
shares. The restricted stock units are subject to forfeiture risk and other restrictions. Upon vesting, the employee is entitled to 
receive one share of the Company’s common stock for each restricted stock unit for no additional payment. During the year ended 
December 31, 2017, the Company’s Board of Directors approved the issuance of 1.39 million RSUs under the Compensation Plan 
(2016 – 1.21 million, 2015 - 0.28 million). 

A summary of the status and activity of non-vested RSUs at December 31, 2017 is as follows: 

159 

 
 
 
 
 
 
 
 
 
 
 
 
Non-vested January 1, 2015 
Granted 

Vested 

Forfeited 

Non-vested December 31, 2015 
Granted 

Vested 

Forfeited 

Non-vested December 31, 2016 
Granted 

Vested 

Forfeited 

Non-vested December 31, 2017 

Number of shares 

Weighted Average 
Grant- Date Fair 
Value 

—  $ 

282,716 

— 

(9,850) 

272,866 
1,205,336 

(138,608) 

(9,125) 

1,330,469 
1,390,705 

(752,580) 

(59,118) 

1,909,477  $ 

— 
4.05 

— 

4.68 

4.03 
2.14 

4.65 

5.39 

2.37 
2.09 

2.35 

2.29 

2.17 

The total fair value of RSUs that vested and were settled for equity in the year ended December 31, 2017 was $1.69 million (2016 
– $0.30 million, 2015 - $nil). 

At December 31, 2017, there was $0.11 million and $1.26 million of unrecognized compensation costs related to the unvested 
stock options and RSU awards, respectively. This cost is expected to be recognized over a period of approximately three years. 

16. INCOME TAXES 

A reconciliation of income tax expense and the product of accounting income before income tax, multiplied by the combined 
Canadian federal and provincial income tax rate (the rate applicable to the Canadian parent company) is as follows: 

Loss before income taxes 

Combined federal and provincial rate 

Expected income tax recovery 

Stock based compensation 

Other non-deductible/non-taxable items 

Foreign tax rate differences 
Unrecognized deferred tax assets 

Income tax expense 

Year ended 
December 31, 
2016 

2015 

2017 

$ 

(27,990) 

$ 

(39,864) 

$ 

(82,357) 

  26.50%   

  26.50% 

(10,600) 

704 

  — 

(2,962) 
12,858 

  26.50% 

(21,825) 

291 

 (2,984) 

(10,180) 
 34,698 

$ 

  — 

$ 

   — 

(7,400) 

934 

(1,303) 

  — 
7,769 

  — 

$ 

160 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The components of the net deferred tax assets and liabilities as of December 31, 2017, 2016 and 2015 are as follows: 

Current deferred tax assets 
Inventories 
Short-term investments 

Total current deferred tax assets 
Non-current deferred tax assets 
Operating loss carry forwards 

Capital loss carry forwards 

Deferred revenue and other 

Mineral properties and deferred costs 

Asset retirement obligations 

Intangibles and other 

Property, plant and equipment 

Total non-current deferred tax assets 
Subtotal deferred tax asset 

Less: valuation allowance 

Net deferred tax asset 

Year ended 
December 31, 

2017 

2016 

2,148 
1,216 

3,364 

74,644 
15,286 

3,695 

28,080 

4,844 

(663) 
845 

126,731 
130,095 

2,900 
413 

3,313 

91,441 

21,322 

3,885 

40,581 

6,398 

(2,524) 

(751) 

160,352 
163,665 

(130,095) 

(163,665) 

$ 

—  $ 

— 

At December 31, 2017, and 2016, the Company recorded a valuation allowance against the net deferred tax assets for the above 
related items in the financial statements as management did not consider it more likely than not that the Company will be able to 
realize the deferred tax assets in the future. 

The following table summarizes the changes to the valuation allowance: 

For the Year 
Ended 
December 31, 

2017 
2016 

Balance at 
Beginning of 
Period 

163,666 
153,651 

Additions (a) 

Deductions (b) 

4,259 
11,166 

(37,830) 
(1,151) 

Balance at End 
of Period 

130,095 
163,666 

a) 

b) 

The additions to the valuation allowance result from additional losses incurred, increases to other tax assets such as 
mineral property and property, plant and equipment.  Management does not feel these additions meet the more-likely- 
than-no criterion for recognition. 

The reductions to the valuation allowance result primarily from the decrease in the net unrecognized deferred tax asset 
due to the change in the U.S. tax law which lowered the corporate tax rate from 35% to 21% beginning 1/1/2018.  The 
decrease in our expected future tax rate results in a reduction in the value of our deferred tax assets by $49,369.  As we 
have a full valuation allowance against our deferred tax asset, a corresponding decrease in our valuation allowance is 
also required. 

161 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table summarizes the Company's capital losses and net operating losses as of December 31, 2017 that can be 
applied against future taxable profit. 

Country 
Canada 
Canada 
Canada 
United States 
United States 

Type 
Non-capital losses 
Allowable Capital  losses 
Investment Tax Credits 
Net operating losses 
Capital losses 

Amount   

$ 

31,159 
3,285 
1,211 
250,518 
54,399 

Expiry Date 
2027 - 2035 
None 
2023 - 2026 
2026 - 2035 
2019 

Utilization of the United States loss carry forwards will be limited in any year as a result of previous changes in ownership. For 
the Energy Fuels Holding Corporation and Subsidiaries consolidated group, management estimates that approximately $75 million 
in net operating losses will expire unutilized as a result of these limitations. 

Utilization of the Canadian loss carry forwards will be subject to the Acquisition of Control Rules in any year as a result of previous 
changes in ownership. 

17. 

SUPPLEMENTAL FINANCIAL INFORMATION 

The components of revenues are as follows: 

The Company has three major customers to which its sales for the year were as follows: 2017 - $13.08 million; $6.99 million; 
$4.40 million; (2016 (three major customers) - $33.36 million; $8.69 million; $7.00 million); (2015 (four major customers) - 
$20.98 million; $16.31 million; $12.53 million; $9.00 million). 

The Company’s revenues by country of customer for the current year were as follows: 2017 - $20.07 million - U.S.; Other - $4.40 
million; (2016 - $50.76 million - U.S.; Other - $3.69 million) (2015 -$37.85 million - U.S.; $20.98 million - South Korea; Other 
- $1.87 million). 

Deferred revenue at December 31, 2017 of $2.47 million (2016 - $2.34 million) relates to proceeds received on delivery of alternate 
feed materials in advance of the required processing activity. 

The components of other income (expense) are as follows: 

Years ended 
December 31, 
2016 

2015 

2017 

Interest income 

$ 

161  $ 

143  $ 

Change in value of investments accounted at fair value 

Change in value of warrant liabilities 

Change in value of convertible debentures 

Gain on settlement of loans and borrowings 

Insurance settlement 

Sales and property tax refunds 

Gain on sale of mineral properties 

Sale of surplus assets 

Other 

Other income (expense) 

509 

784 

(940) 

— 

— 

— 

  — 

1,913 

142 

— 

420 

(407) 

424 

223 

176 

316 

— 

(96) 

$ 

2,569  $ 

1,199  $ 

94 

38 

590 

(1,548) 

— 

— 

— 

— 

— 

406 

(420) 

162 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The components of accounts payable and accrued liabilities are as follows: 

Accounts payable 
Payroll liabilities 

Other accrued liabilities 

Accounts payable and accrued liabilities 

18. 

COMMITMENTS AND CONTINGENCIES 

General legal matters 

December 31, 
2017 

December 31, 
2016 

$ 

$ 

762  $ 
835 

4,852 

6,449  $ 

1,150 
1,374 

3,232 

5,756 

Other than routine litigation incidental to our business, or as described below, the Company is not currently a party to any material 
pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, 
results of operations or cash flows. 

White Mesa Mill 

In November 2012, the Company was served with a Plaintiff’s Original Petition and Jury Demand in the District Court of Harris 
County, Texas, claiming unspecified damages from the disease and injuries resulting from mesothelioma from exposure to asbestos, 
which the Plaintiff claims was contributed to by being exposed to asbestos products and dust while working at the White Mesa 
Mill. The Company does not consider this claim to have any merit, and therefore does not believe it will materially affect our 
financial position, results of operations or cash flows. In January, 2013, the Company filed a Special Appearance challenging 
jurisdiction and certain other procedural matters relating to this claim. This action was dismissed on February 21, 2018 and the 
matter is now finished. 

In January, 2013, the Ute Mountain Ute tribe filed a Petition to Intervene and Request for Agency Action challenging the Corrective 
Action Plan approved by the State of Utah Department of Environmental Quality (“UDEQ”) relating to nitrate contamination in 
the shallow aquifer at the White Mesa Mill site. This challenge is currently being evaluated, and may involve the appointment of 
an administrative law judge to hear the matter. The Company does not consider this action to have any merit. If the petition is 
successful, the likely outcome would be a requirement to modify or replace the existing Corrective Action Plan. At this time, the 
Company does not believe any such modification or replacement would materially affect our financial position, results of operations 
or cash flows. However, the scope and costs of remediation under a revised or replacement Corrective Action Plan have not yet 
been determined and could be significant. 

In April 2014, the Grand Canyon Trust filed a citizen suit in federal District Court for alleged violations of the Clean Air Act at 
the White Mesa Mill. In October 2014, the plaintiffs were granted leave by the Court to add further purported violations to their 
April 2014 suit. The Complaint, as amended, alleged that radon from one of the White Mesa Mill’s tailings impoundments exceeded 
the standard; that the White Mesa Mill is in violation of a requirement that only two tailings impoundments may be in operation 
at any one time; and that certain other violations related to the manner of measuring and reporting radon results from one of the 
tailings impoundments occurred in 2013. The Complaint asked the Court to impose injunctive relief, civil penalties of up to $38,000 
per day per violation, costs of litigation including attorneys’ fees, and other relief. The Company believes the issues raised in the 
Complaint are being addressed through the proper regulatory channels and that we are currently in compliance with all applicable 
regulatory requirements relating to those matters. The Company intends to defend against all issues raised in the Complaint. Cross 
motions for summary judgment were heard by the District Court on November 17, 2016. On September 15, 2017, the Court issued 
its order in favor of the Company on all counts and dismissing the plaintiffs motions. This decision was not appealed by the 
plaintiffs, and the matter is now finished. 

Canyon Project 

In March, 2013, the Center for Biological Diversity, the Grand Canyon Trust, the Sierra Club and the Havasupai Tribe (the “Canyon 
Plaintiffs”)  filed  a  complaint  in  the  U.S.  District  Court  for  the  District  of Arizona  (the  “District  Court”)  against  the  Forest 
Supervisor for the Kaibab National Forest and the USFS seeking an order (a) declaring that the USFS failed to comply  with 
environmental, mining, public land, and historic preservation laws in relation to our Canyon Project, (b) setting aside any approvals 
regarding exploration and mining operations at the Canyon Project, and (c) directing operations to cease at the Canyon Project 
and enjoining the USFS from allowing any further exploration or mining-related activities at the Canyon Project until the USFS 
fully complies with all applicable laws. In April 2013, the Plaintiffs filed a Motion for Preliminary Injunction, which was denied 
by the District Court in September, 2013. On April 7, 2015, the District Court issued its final ruling on the merits in favor of the 

163 

 
 
 
 
 
Defendants and the Company and against the Canyon Plaintiffs on all counts. The Canyon Plaintiffs appealed the District Court’s 
ruling on the merits to the Ninth Circuit Court of Appeals, and filed motions for an injunction pending appeal with the District 
Court. Those motions for an injunction pending appeal were denied by the District Court on May 26, 2015. Thereafter, Plaintiffs 
filed urgent motions for an injunction pending appeal with the Ninth Circuit Court of Appeals, which were denied on June 30, 
2015. The hearing on the merits at the Court of Appeals was held on December 15, 2016. On December 12, 2017, the Ninth Circuit 
Court of Appeals issued its ruling on the merits in favor of the Defendants and the Company and against the Canyon Plaintiffs on 
all counts. The Canyon Plaintiffs have petitioned the Ninth Circuit Court of Appeals for a rehearing en banc. On February 21, 
2018, the Court of Appeals ordered the Defendants and the Company to file a response to the Canyon Plaintiffs' petition for a 
rehearing en banc. If a rehearing is granted and the Canyon Plaintiffs are successful on their appeal on the merits, the Company 
may be required to maintain the Canyon Project on standby pending resolution of the matter. Such a required prolonged stoppage 
of shaft sinking and mining activities could have a significant impact on our future operations. 

Mineral property commitments 

The Company enters into commitments with federal and state agencies and private individuals to lease mineral rights.  These 
leases are renewable annually and annual renewal costs are expected to total $1.37 million for the year ended December 31, 
2018. 

Surety bonds 

The Company has indemnified third-party companies to provide surety bonds as collateral for the Company’s ARO. The Company 
is obligated to replace this collateral in the event of a default, and is obligated to repay any reclamation or closure costs due. The 
Company currently has $22.13 million posted against an undiscounted ARO of $43.46 million (December 2016 - $23.18 million 
posted against undiscounted asset retirement obligation of $43.00 million). 

Commitments 

The Company is contractually obligated under two long -term and two spot contracts to deliver 400,000 and 250,000 pounds of 
U3O8 respectively. 

19. 

SEGMENT INFORMATION 

The Company is engaged in uranium extraction, recovery  and sales of uranium  from mineral properties and the recycling of 
uranium bearing materials generated by third parties. As a part of these activities the Company also acquires, explores, evaluates 
and, if warranted, permits uranium properties. The Company’s primary mining activities are in the United States. 

The  reportable  segments  are  those  operations  whose  operating  results  are  reviewed  by  the  Chief  Operating  Decision  Maker 
(CODM), the Chief Executive Officer for the Company to make decisions about resources to be allocated to the segment and 
assess its performance provided those operations pass certain quantitative thresholds. 

In order to determine any reportable operating segments, management reviewed various factors, including geographical location 
and managerial structure. It was determined by management that a reportable operating segment generally consists of an individual 
property managed by a single general manager and management team. 

The Company previously had two reportable segments, the conventional uranium recovery segment (the “Conventional Uranium 
Segment”) and the in-situ uranium recovery segment (the “ISR Uranium Segment”). 

The Conventional Uranium Segment 

The Conventional Uranium Segment consisted of a standalone conventional uranium recovery facility (the “White Mesa Mill”), 
conventional mining projects in the vicinity of the White Mesa Mill located in the Colorado Plateau, Henry Mountains, Arizona 
Strip, and the Roca Honda Project (“Roca Honda”) in New Mexico, and the Sheep Mountain Project (“Sheep Mountain”) in 
Wyoming. At December 31, 2017 the conventional mining projects in the vicinity of the White Mesa Mill, with the exception of 
shaft sinking and evaluation activities at the Company’s Canyon Mine Project,  are on standby, being evaluated for continued 
mining activities and/or in process of being permitted. The White Mesa Mill also processes third party uranium-bearing mineralized 
materials from mining and recycling activities. 

The ISR Uranium Segment 

The ISR Uranium Segment consisted of an operating uranium recovery facility to recover concentrated uranium from wellfields 
of the Nichols Ranch Project located in Wyoming and a uranium recovery facility and wellfields maintained on standby as part 
of  the Alta  Mesa  Project  in Texas. The  Nichols  Ranch  Project  also  includes  the  Jane  Dough  property  and  the  Hank  Project. 
Additionally, the segment includes other mineral properties in the vicinity of the Nichols Ranch Project and the Alta Mesa Project. 

164 

 
 
 
The Nichols Ranch Project and surrounding assets were acquired as part of the Company’s 2015 acquisition of Uranerz Energy 
Corporation and the Alta Mesa Project was acquired in June of 2016. 

Change in segment reporting 

Due to changes during 2017 in how uranium is delivered under contractual requirements, the Company reevaluated its segment 
presentation. Key factors for establishing two operating segments at the time were each segment had a vice president of operations, 
sales contracts for each segment were satisfied by the output of the respective segment, no commingling of finished product and 
the expectation was that higher prices would expand each segment's opportunities.  At the time the CODM was receiving internal 
reporting including, operating profits for each segment, capital allocations for the development of each segment, contract revenue 
for each segment stayed with the segment and cost reporting per pound. 

During 2017, due to the changes above, the Company has concluded it has only one reportable segment. The Company has re- 
negotiated its primary remaining sales contract to allow deliveries from for any produced material (versus it originally required 
deliveries only from ISR materials sourced from Nichols Ranch production) and the contract is now filled with material from 
the White Mesa Mill.  Nichols Ranch uranium is now finished at the White Mesa Mill, where originally it was completed at a 
third party facility.  At this time the CODM does not receive any internal reporting including operating profits by location and is 
not making capital recommendations by location. 

20. UNAUDITED SUPPLEMENTARY QUARTERLY INFORMATION 

The following table summarizes unaudited supplementary quarterly information for the two years ended December 31, 2017, 

and 2016: 

Net loss 

Net loss per share 

Weighted average shares outstanding 

Basic and Diluted 

Three months ended 

March 31, 
2017 

June 30, 
2017 

September 30, 
2017 

December 31, 
2017 

(unaudited) (in thousands, except share and per share amounts) 

$ 
$ 

(10,596)  $ 
(0.15)  $ 

(4,480)  $ 
(0.06)  $ 

(4,884)  $ 
(0.07)  $ 

(8,030) 
(0.11) 

70,220 

70,567 

71,963 

74,367 

Three months ended 

December 31, 
March 31, 
2016 
2016 
(unaudited) (in thousands, except share and per share amounts) 

September 30, 
2016 

June 30, 
2016 

Net loss 

Net loss per share 

Weighted average shares outstanding 

Basic and Diluted 

$ 

$ 

(8,865)  $ 

(10,441)  $ 

(0.19)  $ 

(0.20)  $ 

(8,245)  $ 

(0.14)  $ 

(12,313) 

(0.19) 

47,660,414 

53,043,512 

58,630,457 

66,205,153 

21. 

FAIR VALUE ACCOUNTING 

Assets and liabilities measured at fair value on a recurring basis 

The following tables set forth the fair value of the Company's assets and liabilities measured at fair value on a recurring 
basis (at least annually) by level within the fair value hierarchy as at December 31, 2017. As required by accounting guidance, 
assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. 

165 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
As at December 31, 2017, the fair values of cash and cash equivalents, restricted cash, short-term deposits, receivables, accounts 
payable and accrued liabilities approximate their carrying values because of the short-term nature of these instruments. 

Investments 

Warrant liabilities (Note 13) 

Convertible debentures (Note 12) 

Level 1 

Level 2 

Level 3 

Total 

$ 

1,937    $ 

  —    $ 

—    $ 

(2,991) 

(16,636) 

(385) 

— 

— 

— 

$ 

(17,690)   $ 

(385)   $ 

—  $ 

 1,937 

(3,376) 

(16,636) 

(18,075) 

The Company's investments are marketable equity securities which are exchange traded, and are valued using quoted market prices 
in active markets and as such are classified within Level 1 of the fair value hierarchy. The fair value of the investments is calculated 
as the quoted market price of the marketable equity security multiplied by the quantity of shares held by the Company. 

Assets and liabilities measured at fair value on a non-recurring basis 

In the year ended December 31, 2015, the Company recorded an impairment charge of $47.73 million associated with the Goodwill 
recognized in the acquisition of Uranerz on June 18, 2015. The estimated fair value used in the December 31, 2015 impairment 
analysis was determined using discounted cash flow projections. Key assumptions used in the calculation of recoverable amounts 
include discount rates, uranium prices, future timing of production volume including the date when a mineral property can be 
brought into production and the expected cost to produce uranium and future care and maintenance and operating costs. 

In the second quarter of 2015, the Company recorded the fair value of Nichols Ranch Project upon acquisition of Uranerz. The 
estimated fair value used in the June 18, 2015 valuation was determined using discounted cash flow projections and various other 
pricing scenarios. Key assumptions used in the calculation of recoverable amounts include discount rates, uranium prices, future 
timing of production volume including the date when a mineral property can be brought into production and the expected cost to 
produce uranium, future care and maintenance and operating costs as well as precedent market transactions data. 

The following table sets forth a summary of the quantitative and qualitative information related to the unobservable inputs used 
in the calculation of the Company's non-recurring Level 3 fair value measurements for the year ended December 31, 2017 and 
2016. 

166 

 
 
 
 
 
 
 
 
 
 
Date of Fair Value 
Measurement 

Valuation 
Technique 

Unobservable 
Input 

Range/Weighted 
Average 

For the years ended December 31, 2017 and 2016 

Nichols Ranch Project and mineral properties 
in the ISR and Conventional segments 

December 31, 2015

Nichols Ranch Project 

June 18, 2015 

Acquired Uranerz exploration properties 

June 18, 2015 and
December 31, 2015 

Discount Rate 

Short and 
Long Term 
Uranium Price 
United States 
Inflation Rate 

Discount Rate 

Short and 
Long Term 
Uranium Price 
United States 
Inflation Rate 

Precedent 
Transaction 
Research 

Discounted 
Cash Flow 
Model 

Discounted 
Cash Flow 
Model 

Enterprise 
value to 
resource 
model and 
acreage 
multiple 

10% 

$38.90 to $62.10 

2% 

10% 

$37.95 to $65.00 

2% 

Measured and 
Indicated pounds 
U3O8 - 2.00x 

Inferred Pounds 
U3O8 - 1.5x 
$77.0x - Acre 

167 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
22. RELATED PARTY TRANSACTIONS 

On May 17, 2017, the Board of Directors of the Company appointed Robert W. Kirkwood and Benjamin Eshleman III to the 
Board of Directors of the Company. 

Mr. Kirkwood is a principal of the Kirkwood Companies, including Kirkwood Oil and Gas LLC, Wesco Operating, Inc., and 
United Nuclear LLC (“United Nuclear”). United Nuclear, owns a 19% interest in the Company’s Arkose Mining Venture while 
the Company owns the remaining 81%. The Company acts as manager of the Arkose Mining Venture and has management and 
control over operations carried out by the Arkose Mining Venture. The Arkose Mining Venture is a contractual joint venture 
governed by a venture agreement dated as of January 15, 2008 entered into by Uranerz Energy Corporation (a subsidiary of the 
Company) and United Nuclear (the “Venture Agreement”). 

United Nuclear contributed $0.37 million to the expenses of the Arkose Joint Venture based on the approved budget for the 
twelve months ended December 31, 2017. 

Mr. Benjamin Eshleman III is President of Mesteña LLC, which became a shareholder of the Company through the Company’s 
acquisition of Mesteña Uranium, L.L.C (now Alta Mesa LLC) in June 2016 through the issuance of 4,551,284 common shares 
of the Company to the direction of the Sellers (of which 4,303,032 common shares of the Company are currently held by the 
Sellers). In connection with the Purchase Agreement, one of the Acquired Companies, Leoncito Project, L.L.C. entered into an 
Amended and Restated Uranium Testing Permit and Lease Option Agreement with Mesteña Unproven, Ltd., Jones Ranch 
Minerals Unproven, Ltd and Mesteña Proven, Ltd. (collectively the “Grantors”), which requires Leoncito Project, L.L.C., to 
make a payment in the amount of $0.60 million to the Grantors in June 2019 (of which up to 50% may be paid in common 
shares of the Company at the Company’s election). At December 31, 2017, the Company has accrued $0.30 million of this 
liability on the balance sheet. The Grantors are managed by Mesteña LLC. 

Pursuant to the Purchase Agreement, the Alta Mesa Properties held by the Acquired Companies are subject to a royalty 
of 3.125% of the value of the recovered U3O8 from the Alta Mesa Properties sold at a price of $65.00 per pound or 
less, 6.25% of the value of the recovered U3O8 from the Alta Mesa Properties sold at a price greater than $65.00 per pound and 
up to and including $95.00 per pound, and 7.5% of the value of the recovered U3O8 from the Alta Mesa Properties sold at a price 
greater than $95.00 per pound. The royalties are held by the Sellers, and Mr. Eshleman and his extended family hold all of 
the ownership interests in the Sellers. In addition, Mr. Eshleman and certain members of his extended family are parties to 
surface use agreements that entitle them to surface use payments from the Acquired Companies in certain circumstances. The 
Alta Mesa Properties are currently being maintained on care and maintenance to enable the Company to restart operations as 
market conditions warrant. Due to the price of U3O8, the Company did not pay any royalty payments or surface use payments 
to the Sellers or to Mr. Eshleman or his immediate family members in the year ended December 31, 2017 and does not 
anticipate paying any royalty payments or surface use payments to the Sellers or to Mr. Eshleman or his immediate family 
members during the remainder of 2017. Pursuant to the Purchase Agreement, surface use payments from June 2016 through 
December 31, 2018 have been deferred until June 30, 2019 at which time the Company will pay $1.35 million to settle this 
obligation. As of December 31, 2017, the Company has accrued $0.81 million of this liability on the balance sheet. 

23. SUBSEQUENT EVENTS 

Issuance of stock options and RSUs 

On January 23, 2018 the Company granted 0.42 million stock options with an exercise price of $1.70 and 0.88 million RSU’s to 
its employees, directors and consultants.$1.70. The options carry a five-year life and are vested as follows: 50% immediately; 
25% on January 23, 2019; 25% on January 23, 2020. The RSU’s vest as follows: 50% on January 27, 2019; 25% on January 27, 
2020; and 25% on January 27, 2021. 

Sale of shares in the Company's ‘At-the-Market’ program (“ATM”). 

From January 1, 2018 through March 8, 2018, the Company has issued 0.39 million shares for proceeds $0.65 million using the 
ATM. 

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL 
DISCLOSURE 

The required disclosure related to our previous change in auditor can be found in our Current Report on Form 8-K filed with the 
SEC on March 29, 2017. 

168 

 
 
 
 
 
 
 
 
Evaluation of Disclosure Controls and Procedures 

ITEM 9A. CONTROLS AND PROCEDURES 

As of the end of the period covered by this Annual Report on Form 10-K, an evaluation was carried out under the supervision of 
and with the participation of the Company’s management, including the Chief Executive Officer (“CEO”) and Chief Financial 
Officer (“CFO”), of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined 
in Rule 13a – 15(e) and Rule 15d – 15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded 
that as of the end of the period covered by this Annual Report on Form 10-K, the Company’s disclosure controls and procedures 
were effective in ensuring that: (i) information required to be disclosed by the Company in reports that it files or submits to the 
SEC under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in applicable 
rules and forms; and (ii) material information required to be disclosed in its reports filed under the Exchange Act is accumulated 
and communicated to its management, including its CEO and CFO, as appropriate, to allow for accurate and timely decisions 
regarding required disclosure. 

It should be noted that while the CEO and CFO believe that the Company’s disclosure controls and procedures provide a reasonable 
level of assurance that they are effective, they do not expect that the Company’s disclosure controls and procedures or internal 
control over financial reporting will prevent all errors and fraud. A control system, no matter how well conceived or operated, can 
provide only reasonable, not absolute, assurance that the objectives of the control system are met. 

Management’s Report on Internal Control over Financial Reporting 

Management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Rule 
13a-15(f) under the Exchange Act. The Company’s management has employed a framework consistent with Exchange Act Rule 
13a-15(c), to evaluate the Company’s internal control over financial reporting described below. A company’s internal control over 
financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the 
preparation of financial statements for external purposes in accordance with generally accepted accounting principles. 

A company’s internal control over financial reporting includes those policies and procedures that: (i) pertain to the maintenance 
of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; 
(ii) provide  reasonable  assurance  that  transactions  are  recorded  as  necessary  to  permit  preparation  of  financial  statements  in 
accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only 
in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding 
prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material 
effect on the financial statements. It should be noted that a control system, no matter how well conceived or operated, can only 
provide reasonable assurance, not absolute assurance, that the objectives of the control system are met. Also, projections of any 
evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in 
conditions, or that the degree of compliance with policies and procedures may deteriorate. 

The senior executive officers, including the Company’s CEO and CFO, conducted an evaluation of the effectiveness, design and 
operation of the Company’s internal control over financial reporting as of December 31, 2017, based on the criteria established 
in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission 
2013 framework. This evaluation included review of the documentation of controls, evaluation of the design effectiveness of 
controls, testing of the operating effectiveness of controls and a conclusion on this evaluation. Based on this evaluation, management 
has concluded that the Company’s internal control over financial reporting was effective as of December 31, 2017 and no material 
weaknesses were discovered. 

It should be noted that while the Company’s CEO and CFO believe that the Company’s internal controls over financial reporting 
provide a reasonable level of assurance that they are effective, they do not expect that the Corporation’s internal controls over 
financial reporting will prevent all errors and fraud. 

Attestation Report of the Registered Public Accounting Firm 

This Annual Report on Form 10-K does not include an attestation report of the Company’s registered independent public accounting 
firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s 
registered independent public accounting firm as the Company qualifies as an “emerging growth company” under the Jumpstart 
Our Business Start-ups Act of 2012. 

169 

 
 
Changes in Internal Control Over Financial Reporting 

During the quarter ended December 31, 2017, there were no changes in the Company’s internal control over financial reporting 
that materially affected, or are likely to materially affect, the Company’s internal control over financial reporting. 

None. 

ITEM 9B. OTHER INFORMATION. 

170 

 
 
 
 
PART III 

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE 

Information relating to this item will be included in the proxy statement for our 2018 Annual Meeting of Shareholders and is 
incorporated by reference in this report. 

Information relating to this item will be included in the proxy statement for our 2018 Annual Meeting of Shareholders and is 
incorporated by reference in this report. 

ITEM 11. EXECUTIVE COMPENSATION 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED 
STOCKHOLDER MATTERS 

Information relating to this item will be included in the proxy statement for our 2018 Annual Meeting of Shareholders and is 
incorporated by reference in this report. 

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR INDEPENDENCE 

Information relating to this item will be included in the proxy statement for our 2018 Annual Meeting of Shareholders and is 
incorporated by reference in this report. 

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES 

Information relating to this item will be included in the proxy statement for our 2018 Annual Meeting of Shareholders and is 
incorporated by reference in this report. 

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES 

Documents Filed as Part of This Report. 

(1) Financial Statements 

Report of Independent Registered Public Accounting Firm 
Consolidated Balance Sheets at December 31, 2017 and 2016 

Consolidated Statements of Operations Comprehensive Loss for the years ended December 31, 2017, 
2016 and 2015 

Consolidated Statements of Operations Comprehensive Loss for the years ended December 31, 2017, 
2016 and 2015 
Consolidated Statements of Changes in Equity 
Consolidated Statements of Cash Flows for the years ended December 31, 2017, 2016, and 2015 

Notes to the Consolidated Financial Statements 

171 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(2) Financial Statement Schedules 

Schedules are omitted and are not applicable or not required, or the required information is shown in the financial statements or 
notes thereto. 

172 

 
(3) Exhibits 

Where an exhibit is filed by incorporation by reference to a previously filed registration statement or report, such registration 
statement or report is identified in parentheses. 

Exhibit 
No. 

Document Description 

1.1 

1.2 

1.3 

3.1 

3.2 

3.3 

4.1 

4.2 

4.3 

4.4 

4.5 

4.6 

4.7 

4.8 

4.9 

Underwriting Agreement by and among the Company, Cantor Fitzgerald Canada Corporation, Haywood 
Securities Inc. and Roth Capital Partners, LLC dated March 9, 2016. (1) 

Underwriting Agreement by and among the Company, Cantor Fitzgerald Canada Corporation and Rodman & 
Renshaw (a unit of H.C. Wainwright & Co. LLC) dated September 14, 2016. (2) 

Amended and Restated Underwriting Agreement by and among the Company, Cantor Fitzgerald Canada 
Corportion and Rodman & Renshaw (a unit of H.C. Wainwright & Co. LLC) dated September 15, 2016.(3) 

Articles of Continuance dated September 2, 2005.(4) 

Articles of Amendment dated May 26, 2006.(5) 

Bylaws.(6) 

The Amended and Restated Convertible Debenture Indenture dated August 4, 2016 between Energy Fuels Inc., 
BNY Trust Company of Canada and the Bank of New York Mellon providing for the issuance of debentures.(7) 

Financing Agreement between Johnson County, Wyoming and Uranerz Energy Corporation dated November 
26, 2013.(8) 

Bond Purchase Agreement among the State of Wyoming, Johnson County and Uranerz Energy Corporation 
dated November 12, 2013.(9) 

Promissory Note among the State of Wyoming, Johnson County and Uranerz Energy Corporation dated 
November 26, 2013.(10) 

Mortgage, Assignment of Revenues, Security Agreement, Fixture Filing and Financing Statement between 
Uranerz Energy Corporation and UMB Bank, n.a. as  Trustee and Mortgagee dated November 26, 2013.(11) 

Shareholder Rights Plan between Energy Fuels Inc., and CIBC Mellon Trust Company dated February 3, 2009. 
(12) 

Warrant Indenture between Energy Fuels Inc. and CST Trust Company providing for the issue of common 
share purchase warrants dated March 14, 2016.(13) 

First Supplemental Indenture among Energy Fuels Inc., CST Trust Company and American Stock Transfer & 
Trust Company, LLC dated April 14, 2016.(14) 

Warrant Indenture between Energy Fuels Inc., CST Trust Company and American Stock Transfer & Trust 
Company, LLC dated September 20, 2016.(15) 

10.1 

Energy Fuels 2013 Amended and Restated Stock Option Plan.(16) 

173 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 
No. 
10.2 

Energy Fuels Inc. Omnibus Compensation Plan dated January 28, 2015.(17) 

Document Description 

10.3 

Sales Agreement between Energy Fuels Inc. and Cantor Fitzgerald & Co. dated December 23, 2016.(18) 

10.4 

Form of Indemnity Agreement between Energy Fuels and its officers and directors.(19) 

10.5 

Amended and Restated Employment Agreement between Energy Fuels Inc., Energy Fuels Resources (USA) 
Inc. and Stephen P. Antony dated August 4, 2016.(20) 

10.6 

Employment Agreement between Energy Fuels Inc. and David C. Frydenlund effective March 2, 2018 

10.7 

Employment Agreement between Energy Fuels Inc. and W. Paul Goranson effective February 14, 2018 

10.8 

Employment Agreement between Energy Fuels Inc. and Mark S. Chalmers effective April 14, 2016.(21) 

10.9 

Employment Agreement between Energy Fuels Inc. and Mark S. Chalmers effective February 1, 2018 

10.10 

Amendment No. 1 to the Sales Agreement between Energy Fuels Inc. and Cantor Fitzgerald & Co. dated 
December 23, 2016.(22) 

10.11 

Professional Services Agreement between Energy Fuels Inc. and Daniel G. Zang dated March 2, 2018 

21.1 

An organizational chart showing Energy Fuels Inc.’s direct and indirect subsidiaries 

23.1 

Consent of KPMG LLP, Independent Registered Public Accountants, U.S. 

23.2 

Consent of Roscoe Postle Associates Inc. 

23.3 

Consent of William E. Roscoe 

23.4 

Consent of Douglas H. Underhill 

23.5 

Consent of Thomas C. Pool 

23.6 

Consent of Robert Michaud 

23.7 

Consent of Stuart E. Collins 

23.8 

Consent of Mark B. Mathisen 

23.9 

Consent of Harold R. Roberts 

23.10 

Consent of David A. Ross 

23.11 

Consent of Peters Geosciences 

174 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 
No. 

Document Description 

23.12 

Consent of Douglas C. Peters 

23.13 

Consent of BRS Inc. 

23.14 

Consent of Douglas L. Beahm 

23.15 

Consent of W. Paul Goranson 

23.16 

Consent of Douglass Graves 

23.17 

Consent of John H. White, III 

23.18 

Consent of Don R. Woody 

23.19 

Consent of Trec, Inc. 

23.20 

Consent of Woody Enterprises 

23.21 

Consent of Allan Moran 

23.22 

Consent of Frank A. Daviess 

23.23 

Consent of SRK Consulting (U.S.) Inc. 

23.24 

Consent of Christopher Moreton 

23.25 

Consent of Valerie Wilson 

23.26 

Consent of Jeffrey Woods 

23.27 

Consent of KPMG LLP, Independent Registered Public Accountants, Canada 

31.1 

Certification of Chief Executive Officer pursuant to Rule 13a-14(a) of the Exchange Act 

31.2 

Certification of Chief Financial Officer pursuant to Rule 13a-14(a) of the Exchange Act 

32.1 

32.2 

Certification of Chief Executive Officer pursuant to Rule 13a-14(b) of the Exchange Act and 18 U.S.C. Section 
1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 

Certification of Chief Financial Officer pursuant to Rule 13a-14(b) of the Exchange Act and 18 U.S.C. Section 
1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 

95.1 

Mine Safety Disclosure 

(1)  Incorporated by reference to Exhibit 10.1 to Energy Fuels' Form 8-K filed March 10, 2016. 

175 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(2)  Incorporated by reference to Exhibit 1.1 to Energy Fuels' Form 8-K filed on September 16, 2016. 
(3)  Incorporated by reference to Exhibit 1.2 of Energy Fuels’ Form 8-K filed with the SEC on September 16, 2016. 
(4)  Incorporated by reference to Exhibit 3.1 of Energy Fuels’ Form F-4 filed with the SEC on May 8, 2015. 
(5)  Incorporated by reference to Exhibit 3.2 of Energy Fuels’ Form F-4 filed with the SEC on May 8, 2015. 
(6)  Incorporated by reference to Exhibit 3.3 of Energy Fuels’ Form F-4 filed with the SEC on May 8, 2015. 
(7)  Incorporated by reference to Exhibit 4.1 to Energy Fuels’ Form 10-Q filed with the SEC on August 5, 2016. 
(8)  Incorporated by reference to Exhibit 4.1 to the Form 8-K filed on December 3, 2013 by Uranerz Energy Corporation. 
(9)  Incorporated by reference to Exhibit 4.2 to the Form 8-K filed on December 3, 2013 by Uranerz Energy Corporation. 
(10) Incorporated by reference to Exhibit 4.3 to the Form 8-K filed on December 3, 2013 by Uranerz Energy Corporation. 
(11) Incorporated by reference to Exhibit 4.4 to the Form 8-K filed on December 3, 2013 by Uranerz Energy Corporation. 
(12) Incorporated by reference to Exhibit 10.9 to Energy Fuels’ Form F-4 filed on May 8, 2015. 
(13) Incorporated by reference to Exhibit 4.1 to Energy Fuels’ Form 8-K filed on March 14, 2016. 
(14) Incorporated by reference to Exhibit 4.1 to Energy Fuels’ Form 8-K filed on April 20, 2016. 
(15) Incorporated by reference to Exhibit 4.1 to Energy Fuels’ Form 8-K filed on September 20, 2016. 
(16) Incorporated by reference from Schedule B of Exhibit 99.84 of Energy Fuels' registration statement on Form 40-F filed 

with the SEC on November 15, 2013. 

(17) Incorporated by reference to Exhibit 4.1 to Energy Fuels’ Form S-8 filed on June 24, 2015. 
(18) Incorporated by reference to Exhibit 1.1 to Energy Fuels’ Form 8-K filed on December 23, 2016. 
(19) Incorporated by reference to Exhibit 10.4 to Energy Fuels’ Form 10-K filed with the SEC on March 15, 2016. 
(20) Incorporated by reference to Exhibit 10.5 to Energy Fuels’ Form 10-Q filed with the SEC on August 5, 2016. 
(21) Incorporated by reference to Exhibit 10.11 to Energy Fuels’ Form 10-Q filed with the SEC on May 6, 2016. 
(22) Incorporated by reference to Exhibit 1.1 to Energy Fuels’ Form 8-K filed with the SEC on December 29, 2017. 

None. 

ITEM 16. FORM 10-K SUMMARY 

176 

 
 
 
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this 
report to be signed on its behalf by the undersigned, thereunto duly authorized. 

SIGNATURES 

ENERGY FUELS INC. 

By:   /s/ Mark S. Chalmers 

Mark S. Chalmers, President & Chief Executive 
Officer 
Principal Executive Officer 
Date: March 9, 2018 

177 

 
 
 
 
 
 
In accordance with the Securities Exchange Act, this report has been signed below by the following persons on behalf of the 
registrant and in the capacities and on the dates indicated. 

Per:   /s/ Mark S. Chalmers 

Mark S. Chalmers, President & Chief Executive 
Officer 
(Principal Executive Officer) and Director 
Date: March 9, 2018 

Per:   /s/ David C. Frydenlund 

David C. Frydenlund, Chief Financial Officer 
(Principal Financial Officer) 
Date: March 9, 2018 

Per:   /s/ Matthew Tarnowski 

Matthew Tarnowski, Chief Accounting Officer & 
Controller 
Date: March 9, 2018 

Per:   /s/ Benjamin Eshleman 

Benjamin Eshleman, Director 
Date: March 9, 2018 

Per:   /s/ Dennis Higgs 

Dennis Higgs, Director 
Date: March 9, 2018 

Per:   /s/ J. Birks Bovaird 

J. Birks Bovaird, Director 
Date: March 9, 2018 

Per:   /s/ Bruce D. Hansen  

Bruce D. Hansen, Director 
Date: March 9, 2018 

Per:   /s/ Robert Kirkwood 

Robert Kirkwood, Director 
Date: March 9, 2018 

Per:   /s/ Paul Carroll 

Paul A. Carroll, Director 
Date: March 9, 2018 

178 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
EMPLOYMENT AGREEMENT 

THIS  EMPLOYMENT AGREEMENT  (“Agreement”)  is  effective  as  of  the  2nd day  of 
March,  2018  (the  “Effective  Date”),  by  and  between  Energy  Fuels  Resources  (USA)  Inc.,  a 
Delaware corporation (“EFRI”), Energy Fuels Inc., an Ontario corporation (“EFI”) (EFRI and EFI 
are collectively referred to herein as the “Company”) and David C. Frydenlund (“Employee”). 

In consideration of the agreements contained in this Agreement, and other good and valuable 
consideration, the receipt and sufficiency of which are hereby acknowledged, the Company and 
Employee hereby agree as follows: 

ARTICLE 1 
EMPLOYMENT, REPORTING AND DUTIES 

1.1. 

Employment.  The Company hereby employs and engages the services of Employee 
to serve as Chief Financial Officer, General Counsel and Corporate Secretary and Employee agrees 
to diligently and competently serve as and perform the functions of Chief Financial Officer, General 
Counsel  and  Corporate  Secretary  for  the  compensation  and  benefits  stated  herein.  A  copy  of 
Employee’s current job description is attached hereto as Exhibit A, and Company and Employee 
agree and acknowledge that, subject to Section 4.2(b), Company retains the right to reasonably add 
to, or remove, duties and responsibilities set forth in that job description as business or other operating 
reasons may arise for changes to occur.  It is understood that Employee will be appointed an officer 
of  EFI  and  EFRI  during  the  term  of  this Agreement,  but  that  Employee’s  direct  employment 
relationship will be as an employee of EFRI. 

1.2. 

Fulltime  Service.  Excluding  any  periods  of  vacation  and  sick  leave  to  which 
Employee may be entitled, Employee agrees to devote Employee’s full time and energies to the 
responsibilities with the Company consistent with past practice and shall not, during the Term of 
this Agreement, be engaged in any business activity which would interfere with or prevent Employee 
from carrying out Employee’s duties under this Agreement. 

ARTICLE 2 
COMPENSATION AND RELATED ITEMS 

2.1.  Compensation. 

As  compensation  and  consideration  for  the  services  to  be  rendered  by  Employee  under  this 
Agreement, the Company agrees to pay Employee and Employee agrees to accept: 

(a) 

Base Salary and Benefits.  A base salary (“Base Salary”) of $270,864 per 
annum,  less  required  tax  withholding,  which  shall  be  paid  in  accordance  with  the  Company’s 
standard payroll practice.  Employee’s Base Salary may be increased from time to time (but not 
1 

 
 
 
 
 
 
 
 
 
 
 
decreased, including after any increase, without Employee’s written consent), at the discretion of 
the Company, and after any such change, Employee’s new level of Base Salary shall be Employee’s 
Base  Salary  for  purposes  of  this Agreement  until  the  effective  date  of  any  subsequent  change. 
Employee shall also receive benefits such as health insurance, vacation and other benefits consistent 
with  the  then  applicable  Company  benefit  plans  to  the  same  extent  as  other  employees  of  the 
Company with similar position or level.  Employee understands and agrees that, subject to Sections 
2.1(b) and (c) below, Company’s benefit plans may, from time to time, be modified or eliminated 
at Company’s discretion. 

(b) 

Cash  Bonus.  A cash  bonus  opportunity  (the  “Cash  Bonus”)  during  each 
calendar year with a target (the “Target Cash Bonus”) equal to forty percent (40)% (the “Target 
Cash Bonus Percentage”) of Employees’ Base Salary for the year in which the cash bonus is paid, 
such cash bonus to be paid in accordance with the Company’s existing Short Term Incentive Plan, 
as such plan may be amended or replaced from time to time, or the equivalent (the “STIP”). Pursuant 
to the terms of the STIP, each annual Cash Bonus shall be payable based on the achievement of 
performance goals, and may be higher or lower than the Target Cash Bonus based on achievement 
of  those  goals. For  each  calendar  year  during  the  term  of  this Agreement,  the  Board  (or  the 
Compensation Committee) of EFI will determine and will establish in writing (i) the applicable 
STIP performance  goals,  which  shall  be  reasonably  achievable  and  if  achieved  would  result  in 
payment of the Target Cash Bonus,  (iii) the  percentage of annual Base Salary to be payable to 
Employee if some lesser or greater percentage of the annual STIP performance goals are achieved, 
and (iv) such other applicable terms and conditions of the STIP necessary to satisfy the requirements 
of Section 409A (“Section 409A”) of the Internal Revenue Code of 1986, as amended (the "Code"); 
and 

(c) 

Equity Award.  An equity award opportunity (the “Equity Award”) during 
each calendar year with a target value (the “Target Equity Award”) equal to eighty percent (80)% 
(the “Target Equity Award Percentage”) of Employee’s Base Salary for the year in which the 
award is granted, such equity award to be awarded in accordance with the Company’s existing Long 
Term Incentive Plan, as such plan may be amended or replaced from time to time, or the equivalent 
(the “LTIP”).  Pursuant to the terms of the LTIP, each annual equity award shall be made based on 
the achievement of performance goals, and may be higher or lower than the Target Equity Award 
based on achievement of those goals. For each calendar year during the term of this Agreement, 
the Board (or the Compensation Committee) of EFI will determine and will establish in writing (i) 
the applicable LTIP performance goals, which shall be reasonably achievable and if achieved would 
result in payment of the Target Equity Award, (iii) the percentage of annual Base Salary value to 
be  awarded  in  equity  to  Employee  if  some  lesser  or  greater  percentage  of  the  annual  LTIP 
performance goals are achieved, and (iv) such other applicable terms and conditions of the LTIP 
necessary to satisfy the requirements of Section 409A of the Code. 

2.2.  Annual  Medical.  The  Company  will  reimburse  Employee  for  the  cost  of  a 
comprehensive  annual  medical  examination  for  each  year  of  this  Agreement,  provided  that 
2 

 
 
 
 
Employee requests such reimbursement and such reimbursement is made no later than the last day 
of the calendar year following the calendar year in which the examination expense was incurred. 
Employee will promptly notify the President & CEO if the annual medical examination reveals any 
condition which, if untreated, is likely to interfere with Employee’s ability to perform the essential 
requirements of his or her position, and if requested by the President & CEO, Employee will provide 
the details of the condition and the potential impact on his or her ability to perform the essential 
requirements  of  his  or  her  position  to  enable  the  President  &  CEO  to  determine  how  best  to 
accommodate Employee and protect the critical business interests of the Company. 

2.3. 

Expenses.  The  Company  agrees  that  Employee  shall  be  allowed  reasonable  and 
necessary business expenses in connection with the performance of Employee’s duties within the 
guidelines  established  by  the  Company  as  in  effect  at  any  time  with  respect  to  key  employees 
(“Business Expenses”), including, but not limited to, reasonable and necessary expenses for food, 
travel,  lodging,  entertainment  and  other  items  in  the  promotion  of  the  Company  within  such 
guidelines. The Company shall promptly reimburse Employee for all reasonable Business Expenses 
incurred by Employee upon Employee’s presentation to the Company of an itemized account thereof, 
together with receipts, vouchers, or other supporting documentation. 

2.4.  Vacation.  Employee will be entitled to four weeks of vacation each year, in addition 
to the 10 paid holidays each year.  Carry over from one year to the next will be as per the Company’s 
paid leave policy. 

2.5.  Use of Company Vehicle.  Employee will be provided the full time use of a suitable 
vehicle for travel between the Lakewood office and home as well as for business travel to field sites 
as required, or the equivalent. 

ARTICLE 3 
TERMINATION 

3.1. 

Term.  Employee’s  employment  under  this  Agreement  shall  commence  on  the 
Effective Date and will end on the date (the “Initial Expiration Date”) that is the second anniversary 
of the Effective Date, unless terminated sooner under the provisions of this Article, or extended 
under the terms of this Section.  If neither Company nor Employee provides written notice of intent 
not to renew this Agreement by ninety (90) days prior to the Initial Expiration Date, this Agreement 
shall  be  automatically  renewed  for  twelve  (12)  additional months,  and  if neither  Company  nor 
Employee provides written notice of intent not to renew this Agreement prior to ninety (90) days 
before the end of such additional 12-month period, this Agreement shall continue to be automatically 
renewed for successive additional 12-month periods until such time either Company or Employee 
provides written notice of intent not to renew prior to ninety (90) days before the end of any such 
renewal period. 

3 

 
 
 
 
 
 
3.2. 

Termination  of  Employment.  Except  as  may  otherwise  be  provided  herein, 

Employee’s employment under this Agreement may terminate upon the occurrence of: 

(a) 

Notice by Company. The termination date specified in a written notice of 

termination that is given by the Company to Employee; 

(b) 

Notice by Employee.  Thirty (30) days after written notice of termination is 

given by Employee to the Company; 

(c) 
Employee’s becoming disabled; 

Death or  Disability.  Employee’s  death  or,  at the  Company’s  option, upon 

(d) 

Deemed  Termination  Without  Just  Cause  upon  a  Change  of  Control.  A 
deemed termination without just cause under Section 4.1(a) upon the occurrence of a Change of 
Control; or 

(e) 

Notice Not to Renew.  If the Company or Employee gives the other a notice 
not to renew this Agreement under Section 3.1, employment under this Agreement shall terminate 
at the close of business at the end of the Initial Expiration Date or at the end of the 12-month renewal 
period in which timely notice not to renew was given, as the case may be. A notice by the Company 
not to renew shall be considered a notice of termination, resulting in the Company terminating 
Employee’s employment under this Agreement. 

Any notice of termination given by the Company to Employee under Section 3.2(a) or (e) above 
shall specify whether such termination is with or without just cause as defined in Section 3.4.  Any 
notice of termination given by Employee to the Company under Section 3.2(b) above shall specify 
whether such termination is made with or without Good Reason as defined in Section 4.2(b). 

3.3.  Obligations of the Company Upon Termination. 

(a)  With  Just  Cause/Without  Good  Reason.  If  the  Company  terminates 
Employee’s  employment  under  this Agreement  with  just  cause  as  defined  in  Section  3.4,  or  if 
Employee terminates his employment without Good Reason as defined in Section 4.2(b), in either 
case whether before or after a Change of Control as defined in Section 4.2(a), then Employee’s 
employment  with  the  Company  shall  terminate  without  further  obligation  by  the  Company  to 
Employee,  other  than  payment  of  all  accrued  obligations  (“Accrued  Obligations”),  including 
outstanding  Base  Salary,  accrued  vacation  pay  and  any  other  cash  benefits  accrued  up  to  and 
including the date of termination.  That payment shall be made in one lump sum, less required tax 
withholding, within ten (10) working days after the effective date of such termination.  Employee 
will  have  up  to  the  earlier  of:  (A)  ninety  (90)  days  from  the  effective  date  of  termination  of 
Employee’s employment; or (B) the date on which the exercise period of the particular stock option 
expires, to exercise only that portion of the stock options previously granted to Employee that have 

4 

 
 
 
 
 
 
 
 
 
not been exercised, but which have vested, and thereafter Employee’s stock options will expire and 
Employee  will  have  no  further  right  to  exercise  the  stock  options.  Any  stock  options  held  by 
Employee that are not yet vested at the termination date immediately expire and are cancelled and 
forfeited to the Company on the termination date.  Any Restricted Stock Units (“RSUs”) held by 
Employee that have vested on or before the termination date shall be paid (or the shares issuable 
thereunder issued) to Employee.  Any RSUs held by Employee that are not vested on or before the 
termination date will be immediately cancelled and forfeited to the Company on the termination 
date.  The rights of Employee upon termination in respect of any other awards granted to Employee 
under any of the Company’s equity compensation plans shall be as set forth in such plans or in the 
award agreement for any such awards, as applicable. Notwithstanding the foregoing, on retirement, 
Employee will have up to the earlier of: (A) one hundred and eighty (180) days from the effective 
date of retirement; or (B) the date on which the exercise period of the particular stock option expires, 
to exercise only that portion of the stock options previously granted to Employee that have not been 
exercised, but which have vested, and thereafter Employee’s stock options will expire and Employee 
will have no further right to exercise the stock options. 

(b)  With  Good  Reason/Without  Just  Cause/Disabled/Death.  If  Employee 
terminates Employee’s employment under this Agreement for Good Reason as defined in Section 
4.2(b), or  if  the  Company  terminates  Employee’s  employment without  just  cause as  defined  in 
Section  3.4,  or  if  the  Company  terminates  Employee’s  employment  by  reason  of  Employee 
becoming  Disabled  as  defined  in  Section  3.5,  or  if  Employee  dies  (in  which  case  the  date  of 
Employee’s death shall be considered his or her termination date), in any case whether before or 
after a Change of Control as defined in Section 4.2(a), or if there is a deemed termination without 
just  cause  upon  a  Change  of  Control  as  contemplated  by  Section  4.1(a),  then  Employee’s 
employment with the Company shall terminate, as of the effective date of the termination, and in 
lieu of any other severance benefit that would otherwise be payable to Employee: 

(i) 

the Company shall pay the following amounts to Employee (or, in 
the case of termination by reason of Employee becoming Disabled or upon the death 
of Employee, to Employee’s legal representative or estate as applicable) after the 
effective date of such termination, or in a manner and at such later time as specified 
by Employee (or Employee’s legal representative), and agreed to by the Company, 
subject to being in compliance with Section 409A of the Code: 

(A) 

all Accrued Obligations, less required tax withholding, up to 
and including the date of termination, to be paid on the date of termination 
of employment, or within no more than five (5) working days thereafter, and 
the Company will reimburse the Employee for all proper expenses incurred 
by the Employee in discharging his responsibilities to the Company prior to 
the  effective  date  of  termination  of  the  Employee’s  employment  in 
accordance with Section 2.3 above; and 

5 

 
 
 
 
(B) 

an  amount  in  cash  equal  to  one  and  one  half  (1.5)  (the 
“Severance Factor”) times the sum of Employee’s Base Salary, Target Cash 
Bonus  and  Target  Equity  Award  for  the  full  year  in  which  the  Date  of 
Termination occurs, less required tax withholding, such amount to be paid 
within thirty (30) calendar days after the date Employee signs the Release 
contemplated by Section 3.7; 

(ii) 

Employee  or  Employee’s  legal  representative  will  have  up  to  the 
earlier of: (A) ninety (90) days from the effective date of termination of Employee’s 
employment for all cases other than the death of Employee and twelve (12) months 
from the effective date of termination of Employee’s employment in the  case of 
death of Employee; or (B) the date on which the exercise period of the particular 
stock option expires, to exercise only that portion of the stock options previously 
granted  to  Employee  that  have  not  been  exercised,  but  which  have  vested,  and 
thereafter Employee’s stock options will expire and Employee or his or her legal 
representative will have no further right to exercise the stock options.  Subject to 
Section 4.1(c), any stock options held by Employee that are not yet vested at the 
termination date immediately expire and are cancelled and forfeited to the Company 
on the termination date.  Any RSUs held by Employee that have vested on or before 
the  termination  date  shall  be  paid  (or  the  shares  issuable  thereunder  issued)  to 
Employee or his or her legal representative or estate as applicable. Subject to Section 
4.1(c), any RSUs held by Employee that are not vested on or before the termination 
date will be immediately cancelled and forfeited to the Company on the termination 
date.  Subject  to  Section  4.1(c),  the  rights  of  Employee  or  his  or  her  legal 
representative or estate as applicable upon termination in respect of any other awards 
granted to Employee under any of the Company’s equity compensation plans shall 
be as  set forth  in such  plans  or in  the  award  agreement for  any  such awards,  as 
applicable; 

(iii)  Upon  termination,  the  Company  or  its  Successor  (as  defined  in 
Section  4.1(a)),  agrees  to  reimburse  Employee  the  full  cost  of  the  COBRA 
continuation rate charged for employee and dependent coverage, through the EFRI 
Health and Welfare Plan on a monthly basis, for a period of months equal to twelve 
times  the  Severance  Factor  (the  “Coverage  Period”),  beyond  Employee’s 
termination  month.  Employee  and  his  or  her  dependents  may,  at  their  choosing, 
enroll in the COBRA continuation plan through EFRI for the first eighteen months 
following Employee’s termination month or, if they choose, they may enroll in a 
separate plan of their choosing, by using the reimbursement to enroll in medical and 

6 

 
 
 
 
 
 
prescription insurance of their choosing. Reimbursement at the rate described herein 
will continue for the Coverage Period beyond Employee’s termination month, but 
beginning with the nineteenth month, Employee and his or her dependents will need 
to obtain coverage from a different source than the COBRAcontinuation plan through 
EFRI.  The reimbursement will be to Employee and his or her dependents directly, 
and will be grossed up so that there is no negative tax impact to the Employee or his 
or dependents for coverage of the premiums charged by the insurance carriers for 
the COBRA continuation coverage for the current month of reimbursement. The 
reimbursed cost of COBRA coverage will be indexed annually, and will match the 
rate charged for any month of coverage available by the insurance carrier for Medical, 
Dental, and Optical coverage through EFRI for employee and spouse coverage. Both 
Employee and his or her dependents, will have the option of purchasing a medical 
plan separate from the plan offered by EFRI; and 

(iv)  Nothing herein shall preclude the Company from granting additional 

severance benefits to Employee upon termination of employment. 

Notwithstanding the foregoing, in the  case of Disability, any  Base Salary  payable to Employee 
during the one hundred and eighty (180) day period of disability will be reduced by the amount of 
any  disability  benefits  Employee  receives  or  is  entitled  to  receive  as  a  result  of  any  disability 
insurance policies for which the Company has paid the premiums. 

(c) 

Section 280G.  Notwithstanding any other provisions of this Agreement, or 
any other plan, arrangement or agreement to the contrary, if any of the payments or benefits provided 
or to be provided by the Company or its affiliates to Employee or for Employee’s benefit pursuant 
to the terms of this Agreement or otherwise (“Covered Payments”) constitute “parachute payments” 
within the meaning of Section 280G of the Code and would, but for this Section 3.3(c) be subject 
to the excise tax imposed under Section 4999 of the Code (or any successor provision thereto) or 
any similar tax imposed by state or local law or any interest or penalties with respect to such taxes 
(collectively, the “Excise Tax”), then the following shall apply: 

(i) 

If the Covered Payments, reduced by the sum of (1) the Excise Tax 
and (2) the total of the Federal, state, and local income and employment taxes payable 
by Employee on the amount of the Covered Payments which are in excess of three 
times Employee’s “base amount” within the meaning of Section 280(G) of the Code 
less one dollar (the “Threshold Amount”), are greater than or equal to the Threshold 
Amount, Employee shall be entitled to the full benefits payable under this Agreement; 
and 

(ii) 

If the Threshold Amount is less than (1) the Covered Payments, but 
greater than (2) the Covered Payments reduced by the sum of (x) the Excise Tax and 

7 

 
 
 
 
 
 
(y) the total of the Federal, state, and local income and employment taxes on the 
amount of the Covered Payments which are in excess of the Threshold Amount, then 
the Covered Payments shall be reduced (but not below zero) to the extent necessary 
so that the sum of all Covered Payments shall not exceed the Threshold Amount.  In 
such event, the Covered Payments shall be reduced in the following order:  (A) cash 
payments not subject to Section 409A; (B) cash payments subject to Section 409A; 
(C) equity-based payments and acceleration; and (D) non-cash forms of benefits. 
To the extent any payment is to be made over time (e.g., in installments, etc.), then 
the payments shall be reduced in reverse chronological order. 

The  determination  as  to  which  of  the  alternative  provisions  of  Section  3.3(c)(ii)  shall  apply  to 
Employee shall be made by a nationally recognized accounting firm selected by the Company (the 
“Accounting Firm”), which shall provide detailed supporting calculations both to the Company 
and Employee within 15 business days of the date of termination, if applicable, or at such earlier 
time as is reasonably requested by the Company or  Employee.  For purposes of determining which 
of the alternative provisions of Section 3.3(c)(ii) shall apply, Employee shall be deemed to pay 
Federal income taxes at the highest marginal rate of Federal income taxation applicable to individuals 
for the calendar year in which the determination is to be made, and state and local income taxes at 
the highest marginal rates of individual taxation in the state and locality of Employee’s residence 
on the date of termination, net of the maximum reduction in Federal income taxes which could be 
obtained from deduction of such state and local taxes.  Any determination by the Accounting Firm 
shall be binding upon the Company and Employee. 

3.4.  Definition of Just Cause. 

As used in this Agreement, the term “just cause” will mean any one or more of the following events: 

(a) 

theft,  fraud,  dishonesty,  or  misappropriation  by  Employee  involving  the 
property, business or affairs of the Company or the discharge of Employee’s responsibilities or the 
exercise of his or her authority; 

(b) 

willful misconduct or the willful failure by Employee to properly discharge 

his or her responsibilities or to adhere to the policies of the Company; 

(c) 

Employee’s gross negligence in the discharge of his or her responsibilities 
or  involving  the  property,  business  or  affairs  of  the  Company  to  the  material  detriment  of  the 
Company; 

(d) 

Employee’s conviction of a criminal or other statutory offence that constitutes 
a felony or which has a potential sentence of imprisonment greater than six (6) months or Employee’s 
conviction of a criminal or other statutory offence involving, in the sole discretion of the Board of 
Directors of EFI, moral turpitude; 

8 

 
 
 
 
 
 
 
 
(e) 

(f) 

or 6 below; 

Employee’s material breach of a fiduciary duty owed to the Company; 

any material breach by Employee of the covenants contained in Articles 5 

(g) 

Employee’s unreasonable refusal to follow the lawful written direction of 

the President and Chief Executive Officer of the Company on any material matter; 

(h) 

any conduct of Employee which, in the reasonable opinion of the President 
and Chief Executive Officer of the Company or Board of Directors of EFI, is materially detrimental 
or embarrassing to the Company; or 

(i) 

any other conduct by Employee that would constitute “just cause” as that 

term is defined at law. 

The Company must provide written notice to Employee prior to termination for just cause pursuant 
to Section 3.4 (c), (f), (g), (h), or (i) and provide Employee the opportunity to correct and cure the 
failure within thirty (30) days from the receipt of such notice.  If the parties disagree as to whether 
the Company had just cause to terminate the Employee’s employment, the dispute will be submitted 
to binding arbitration pursuant to Section 7.10 below. 

3.5.  Definition of Disabled.  As used herein, “Disabled” shall mean a mental or physical 
impairment which, in the reasonable opinion of a qualified doctor selected by mutual agreement of 
the  Company  and  Employee  acting  reasonably,  renders  Employee  unable,  with  reasonable 
accommodation, to perform with reasonable diligence the essential functions and duties of Employee 
on a full-time basis in accordance with the terms of this Agreement, which inability continues for 
a period of not less than 180 consecutive days.  The providing of service to the Company for up to 
two (2) three (3) day periods during the one hundred and eighty (180) day period of disability will 
not affect the determination as to whether Employee is Disabled and will not restart the one hundred 
and eighty (180) day period of disability. If any dispute arises between the parties as to whether 
Employee is Disabled, Employee will  submit to an examination by a physician selected by the 
mutual agreement of the Company and Employee acting reasonably, at the Company’s expense. 
The decision of the physician will be certified in writing to the Company, and will be sent by the 
Physician to Employee or Employee’s legally authorized representative, and will be conclusive for 
the purposes of determining whether Employee is Disabled. If Employee fails to submit to a medical 
examination within twenty (20) days after the Company’s request, Employee will be deemed to 
have voluntarily terminated his or her employment. 

3.6.  Return  of  Materials;  Confidential  Information.  In  connection  with  Employee’s 
separation from employment for any reason, Employee shall return any and all physical property 
belonging to the Company, and all material of whatever type containing “Confidential Information” 
as defined in Section 5.2 below, including, but not limited to, any and all documents, whether in 

9 

 
 
 
 
 
 
 
 
 
paper  or  electronic  form,  which  contain  Confidential  Information,  any  customer  information, 
production information, manufacturing-related information, pricing information, files, memoranda, 
reports, pass codes/access cards, training or other reference manuals, Company vehicle, telephone, 
gas cards or other Company credit cards, keys, computers, laptops, including any computer disks, 
software, facsimile machines, memory devices, printers, telephones, pagers or the like. 

3.7.  Delivery of Release.  Within ten (10) working days after termination of Employee’s 
employment, and as a condition for receipt of payments set forth in Section 3.3(b)(i)(B), 3.3(b)(iii), 
and 4.1(a), the Company shall provide to Employee, or Employee’s legal representative, a form of 
written release, which form shall be satisfactory to the Company and generally consistent with the 
form of release used by the Company prior to such termination of employment (the “Release”) and 
which shall provide a full release of all claims against the Company and its corporate affiliates, 
except  where  Employee  has  been  named  as  a  defendant  in  a  legal  action  arising  out  of  the 
performance of Employee’s responsibilities in which case the Release will exempt any claims which 
Employee or his or her legal representative or estate may have for indemnity by the Company with 
respect to any such  legal action. As  a condition to the  obligation of  the  Company to make the 
payments provided for in such Sections Employee, or Employee’s legal representative, shall execute 
and deliver the Release to the Company within the time periods provided for in said release. 

3.8.  Costs of Relocation to Canada on a Termination. In the event of any termination, 
and in addition to all other amounts payable to Employee hereunder, the Company will reimburse 
all Employee’s direct costs of relocating from Denver to Vancouver, provided such relocation occurs 
within 14 months from the date of termination of Employee’s employment hereunder.  This would 
include the costs associated with the sale of Employee’s residence in Denver (i.e., reasonable realtor 
commissions and legal, documentation and filing fees associated therewith), cost of moving personal 
possessions  and  family  members  (including  the  cost  of  airplane  tickets  for  Employee  and 
Employee’s immediate family for one air flight) and a lump sum payment to cover estimated U.S. 
or Canadian income taxes payable on the relocation costs paid to you.  Employee will discuss with 
the Company and consider any legitimate planning methods for the minimization of any such taxes. 
This will not include any costs associated with the purchase of a new residence in Canada, or any 
temporary lodging  expenses in Canada or Denver.  This paragraph will  also apply to relocation 
from Denver to another location in Canada other than Vancouver, but only to the extent such costs 
do not exceed the costs that would apply to a relocation to Vancouver. Notwithstanding the foregoing, 
this clause will not apply to the extent the costs contemplated in this clause are paid by another 
employer. 

10 

 
 
ARTICLE 4 

CHANGE OF CONTROL 

4.1. 

Effect of Change of Control.  In the event of a Change of Control of EFI during the 

term of this Agreement, or any renewal of this Agreement the following provisions shall apply: 

(a) 

If upon the Change of Control 

(i) 

Employee is not retained by EFI or its successor (whether direct or 
indirect,  by  purchase  of  assets,  merger,  consolidation,  exchange  of  securities, 
amalgamation, arrangement or otherwise) to all or substantially all of the business 
and/or assets of EFI (“Successor”) on the same terms and conditions as set out in 
this Agreement and in circumstances that would not constitute Good Reason (where 
Good Reason is determined by reference to Employee’s employment status prior to 
the  Change  of  Control  and  prior  to  any  other  event  that  could  constitute  Good 
Reason); and/or 

(ii) 

any such Successor does not, by agreement in form and substance 
satisfactory to Employee, expressly assume and agree to perform this Agreement in 
the same manner and to the same extent that EFI would be required to perform it if 
no such succession had taken place, 

then Employee shall be deemed to be terminated without just cause upon such Change of Control 
and shall be entitled to the compensation and all other rights specified in Article 3 in the same 
amount and on the same terms as if terminated without just cause as set out therein, subject to the 
additional rights set out in paragraph (c) below; 

(b) 

All rights of Employee in this Agreement, including without limitation all 
rights to severance and other rights upon a termination with or without cause, with or without Good 
Reason, upon a disability or upon death under Article 3 of this Agreement shall continue after a 
Change of Control in the same manner as before the Change of Control, subject to the additional 
rights set out in paragraph (c) below; 

(c) 

if, 

(i) 

there is a deemed termination without cause under Section 4.1(a); or 

(ii) 

within twelve (12) months following the effective date of the Change 
of Control, EFI, or its successor, terminates the employment of Employee without 
just cause or by reason of Disability, or Employee terminates his or her employment 
under this Agreement for Good Reason, 

11 

 
 
 
 
 
 
 
 
 
 
then, in addition to the other rights Employee has under this Agreement, and notwithstanding any 
other provision in this Agreement, all of the stock options previously granted to Employee that have 
neither vested nor expired will automatically vest and become immediately exercisable, any period 
of  restriction  and  other  restrictions  imposed  on  all  RSUs  shall  lapse,  and  all  RSUs  shall  be 
immediately settled and payable, and all other securities awarded shall vest and/or accelerate in 
accordance with Article 16 of the EFI Omnibus Equity Incentive Plan or the comparable provisions 
of any other equity incentive plan under which such securities may have been issued. Employee 
will have ninety (90) days from the effective date of the termination of Employee’s employment to 
exercise any stock options which had vested as of the effective date of termination and thereafter 
Employee’s stock options will expire and Employee will have no further right to exercise the stock 
options. 

4.2.  Definitions  of  Change  of  Control  and  Good  Reason.  For  the  purposes  of  this 

Agreement, 

(a) 

“Change of Control” will mean the happening of any of the following events: 

(i) 

any transaction at any time and by whatever means pursuant to which 
(A) EFI goes out of existence by any means, except for any corporate transaction or 
reorganization in which the proportionate voting power among holders of securities 
of  the  entity  resulting  from  such  corporate  transaction  or  reorganization  is 
substantially  the  same  as  the  proportionate  voting  power  of  such  holders  of  EFI 
voting securities immediately prior to such corporate transaction or reorganization 
or (B) any Person (as defined in the Securities Act (Ontario)) or any group of two 
or  more  Persons  acting  jointly  or  in  concert  (other  than  EFI,  a  wholly-owned 
Subsidiary of EFI, an employee benefit plan of EFI or of any of its wholly-owned 
Subsidiaries (as defined in the Securities Act (Ontario)), including the trustee of any 
such  plan  acting  as  trustee)  hereafter  acquires  the  direct  or  indirect  “beneficial 
ownership” (as defined by the Business Corporations Act (Ontario)) of, or acquires 
the right to exercise control or direction over, securities of EFI representing 50% or 
more  of  EFI’s  then  issued  and  outstanding  securities  in  any  manner  whatsoever, 
including, without limitation, as a result of a take-over bid, an exchange of securities, 
an  amalgamation  of  EFI  with  any  other  entity,  an  arrangement,  a  capital 
reorganization or any other business combination or reorganization; 

(ii) 

the sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, whether or not related, to a Person 
or any group of two or more Persons acting jointly or in concert, other than a wholly- 
owned Subsidiary of EFI; 

(iii) 

the dissolution or liquidation of EFI except in connection with the 
distribution  of  assets  of  EFI  to  one  or  more  Persons  which  were  wholly-owned 
Subsidiaries of EFI immediately prior to such event; 

12 

 
 
 
 
 
 
(iv) 

the  occurrence  of  a  transaction  requiring  approval  of  EFI’s 
shareholders whereby EFI is acquired through consolidation, merger, exchange of 
securities, purchase of assets, amalgamation, arrangement or otherwise by any other 
Person  (other  than  a  short  form  amalgamation  or  exchange  of  securities  with  a 
wholly-owned Subsidiary of EFI); 

(v) 

a  majority  of  the  members  of  the  Board  of  Directors  of  EFI  are 
replaced or changed  as  a  result of or in  connection with any:  (A) take-over bid, 
consolidation, merger, exchange of securities, amalgamation, arrangement, capital 
reorganization  or  any  other  business  combination  or  reorganization  involving  or 
relating to EFI; (B) sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, or any purchase of assets; or (C) 
dissolution or liquidation of EFI; 

(vi) 

during any two-year period, a majority of the members of the Board 
of Directors of EFI serving at the date of this Agreement is replaced by directors 
who are not nominated and approved by the Board of Directors of EFI; 

(vii) 

an event set forth in (i), (ii), (iii), (iv), (v) or (vi) has occurred with 
respect to EFRI or any of its direct or indirect parent companies, in which case the 
term “EFI” in those paragraphs will be read to mean “EFRI or such parent company” 
and the phrase “wholly-owned Subsidiary(ies)” will be read to mean “Affiliate(s) 
or wholly-owned Subsidiary(ies)”; or 

(viii) 

the Board of Directors of EFI passes a resolution to the effect that, 

an event set forth in (i), (ii), (iii), (iv), (v), (vi) or (vii) above has occurred. 

(b) 

“Good Reason” means, without the written agreement of Employee, there 

(i) 

a material reduction or diminution in the level of responsibility, or 
office  of  Employee,  provided  that  before  any  claim  of  material  reduction  or 
diminution of responsibility may be relied upon by Employee, Employee must have 
provided written notice to Employee’s supervisor and the EFI’s Board of Directors 
of the alleged material reduction or diminution of responsibility and have given EFI 
at least thirty (30) calendar days within which to cure the alleged material reduction 
or diminution of responsibility; and provided further that ceasing to be the Chief 
Financial  Officer  of  the  Company  shall  not  constitute  a  material  reduction  or 
diminution  in  the  level  of  responsibility,  or  office  of  Employee,  if  Employee  is 
retained at a comparable level of responsibility and office, such as in the office of 
“Chief Legal Officer and Corporate Secretary” or the equivalent, and continues to 
report directly to the President and Chief Executive Officer of the Company; 

13 

is: 

 
 
 
 
 
 
 
 
(ii) 

a  reduction  in  the  Employee’s  Base  Salary,  Target  Cash  Bonus 

Percentage or Target Equity Award Percentage; or 

(iii) 

a  proposed,  forced  relocation  of  Employee  to  another  geographic 
location greater than fifty (50) miles from Employee’s office location at the time a 
move is requested after a Change of Control. 

ARTICLE 5 
CONFIDENTIALITY 

5.1. 

Position  of Trust and  Confidence.  Employee acknowledges that in  the  course of 
discharging his or her responsibilities, he or she will occupy a position of trust and confidence with 
respect to the affairs and business of the Company and its customers and clients, and that he or she 
will have access to and be entrusted with detailed confidential information concerning the present 
and contemplated mining and exploration projects, prospects, and opportunities of the Company. 
Employee acknowledges that the disclosure of any such confidential information to the competitors 
of the Company or to the general public would be highly detrimental to the best interests of the 
Company.  Employee  further  acknowledges  and  agrees  that  the  right  to  maintain  such  detailed 
confidential information constitutes a proprietary right which the Company is entitled to protect. 

5.2.  Definition  of  Confidential  Information.  In 

this  Agreement,  “Confidential 
Information” means any information disclosed by or on behalf of the Company to Employee or 
developed by Employee in the performance of his or her responsibilities at any time before or after 
the  execution  of  this Agreement,  and  includes  any  information,  documents,  or  other  materials 
(including, without limitation, any drawings, notes, data, reports, photographs, audio and/or video 
recordings, samples and the like) relating to the business or affairs of the Company or its respective 
customers, clients or suppliers that is confidential or proprietary, whether or not such information: 

(i) 

is reduced to writing; 

(ii) 

was created or originated by an employee; or 

(iii) 

is designated or marked as “Confidential” or “Proprietary” or some 

other designation or marking. 

The Confidential Information includes, but is not limited to, the following categories of information 
relating to the Company: 

(a) 

information  concerning  the  present  and  contemplated  mining,  milling, 
processing and exploration projects, prospects and opportunities, including joint venture projects, 
of the Company; 

14 

 
 
 
 
 
 
 
 
 
 
 
(b) 

information  concerning  the  application  for  permitting  and  eventual 
development or construction of the Company’s properties, the status of regulatory and environmental 
matters, the compliance status with respect to licenses, permits, laws and regulations, property and 
title matters and legal and litigation matters; 

(c) 

information  of  a  technical  nature  such  as  ideas,  discoveries,  inventions, 
improvements, trade secrets, now-how, manufacturing processes, specifications, writings and other 
works of authorship; 

(d) 

financial  and  business  information  such  as  the  Company’s  business  and 
strategic  plans,  earnings,  assets,  debts,  prices,  pricing  structure,  volume  of  purchases  or  sales, 
production, revenue and expense projections, historical financial statements, financial projections 
and budgets, historical and projected sales, capital spending budgets and plans, or other financial 
data  whether  related  to  the  Company’s  business  generally,  or  to  particular  products,  services, 
geographic areas, or time periods; 

(e) 

supply and service information such as goods and services suppliers’ names 
or addresses, terms of supply or service contracts of particular transactions, or related information 
about potential suppliers to the extent that such information is not generally known to the public, 
and to the extent that the combination of suppliers or use of a particular supplier, although generally 
known or available, yields advantages to the Company, the details of which are not generally known; 

(f) 

marketing information, such as details about ongoing or proposed marketing 
programs or agreements by or on behalf of the Company, sales forecasts or results of marketing 
efforts or information about impending transactions; 

(g) 

personnel information relating to employees, contractors, or agents, such as 
personal histories, compensation or other terms of employment or engagement, actual or proposed 
promotions, hirings, resignations, disciplinary actions, terminations or reasons therefor, training 
methods, performance, or other employee information; 

(h) 

customer  information,  such  as  any  compilation  of  past,  existing  or 
prospective  customer’s names, addresses, backgrounds,  requirements,  records of purchases and 
prices, proposals or agreements between customers and the Company, status of customer accounts 
or credit, or related information about actual or prospective customers; 

(i) 

computer software of any type or form and in any stage of actual or anticipated 
development, including but not limited to, programs and program modules, routines and subroutines, 
procedures,  algorithms,  design  concepts,  design  specifications  (design  notes,  annotations, 
documentation, float charts, coding sheets, and the like), source codes, object code and load modules, 
programming, program patches and system designs; and 

15 

 
 
 
 
 
 
 
 
 
(j) 

all information which becomes known to Employee as a result of Employee’s 
employment by the Company, which Employee acting reasonably, believes or ought to believe is 
confidential or proprietary information from its nature and from the circumstances surrounding its 
disclosure to Employee. 

5.3.  Non-Disclosure.  Employee, both during his or her employment and for a period of 
five (5) years after the termination of his or her employment irrespective of the time, manner or 
cause of termination, will: 

(a) 

retain in confidence all of the Confidential Information; 

(b) 

refrain from disclosing to any person including, but not limited to, customers 
and suppliers of the Company, any of the Confidential Information except for the purpose of carrying 
out Employee’s responsibilities with the Company, and 

(c) 

refrain from directly or indirectly using or attempting to use such Confidential 
Information in any way, except for the purpose of carrying out Employee’s responsibilities with the 
Company. 

Employee shall deliver promptly to the Company, at the termination of Employee’s employment, 
or at any other time at the Company’s request, without retaining any copies, all documents and other 
material in Employee’s possession relating, directly or indirectly, to any Confidential Information. 

It is understood that should Employee be subject to subpoena or other legal process to seek the 
disclosure of such Confidential Information, Employee will advise the Company of such process 
and  provide  the  Company  with  the  necessary  information  to  seek  to  protect  the  Confidential 
Information. 

5.4.  Whistleblower Laws.  The  foregoing  obligations of  confidentiality set  out in  this 
Article 5 are subject to applicable whistleblower laws, which protect Employee’s right to provide 
information to governmental and regulatory authorities, including communications with the U.S. 
Securities and Exchange Commission about  possible  securities law violations.  Notwithstanding 
any other provision in this Agreement, Employee is not required to seek the Company’s permission 
or notify the Company of any communications made in compliance with applicable whistleblower 
laws, and the Company will not consider any such communications to violate this Agreement or 
any  other  agreement  between  Employer  and  the  Company  or  any  Company  policy  by  which 
Employee is bound. 

16 

 
 
 
 
 
 
 
 
 
ARTICLE 6 
NON-SOLICITATION 

6.1.  Non-Solicitation.  Employee  agrees  that  during  the  period  (the  “Non-Solicitation 
Period”) commencing on the date of this Agreement and ending twelve (12) months after the effective 
date of the termination of Employee’s employment irrespective of the time, manner or cause of 
termination, Employee will not, either individually or in partnership or jointly or in conjunction 
with any other person, entity or organization, as principal, agent, consultant, contractor, employer, 
employee or in any other manner, directly or indirectly: 

(a) 

solicit  business  from  any  customer,  client  or  business  relation  of  the 
Company,  or  prospective  customer,  client  or  business  relation  that  the  Company  was  actively 
soliciting, whether or not Employee had direct contact with such customer, client or business relation, 
for the benefit or on behalf of any person, firm or corporation operating a business which competes 
with the Company, or attempt to direct any such customer, client or business relation away from 
the Company or to discontinue or alter any one or more of their relationships with the Company; 
or 

(b) 

hire or offer to hire or entice away or in any other manner persuade or attempt 
to persuade any officer, employee, consultant, independent contractor, agent, licensee, supplier, or 
business relation of the Company to discontinue or alter any one of their relationships with the 
Company. 

6.2.  Remedies  for  Breach  of  Restrictive  Covenants.  Employee  acknowledges  that  in 
connection with Employee’s employment he or she will receive or will become eligible to receive 
substantial benefits and compensation.  Employee acknowledges that Employee’s employment by 
the Company and all compensation and benefits from such employment will be conferred by the 
Company upon Employee only because and on the condition of Employee’s willingness to commit 
Employee’s  best  efforts  and  loyalty  to  the  Company,  including  protecting  the  Company’s 
confidential information and abiding by the non-solicitation covenants contained in this Agreement. 
Employee understands that his obligations set out in Article 5 and this Article 6 will not unduly 
restrict or curtail Employee’s legitimate efforts to earn a livelihood following any termination of 
his or her employment with the Company. Employee agrees that the restrictions contained in Article 
5 and this Article 6 are reasonable and valid and all defenses to the strict enforcement of these 
restrictions  by  the  Company  are  waived  by  Employee.  Employee  further  acknowledges  that  a 
breach or threatened breach by Employee of any of the provisions contained in Article 5 or this 
Article 6 would cause the Company irreparable harm which could not be adequately compensated 
in damages alone.  Employee further acknowledges that it is essential to the effective enforcement 
of this Agreement that, in addition to any other remedies to which the Company may be entitled at 
law or in equity or otherwise, the Company will be entitled to seek and obtain, in a summary manner, 
from any Court having jurisdiction, interim, interlocutory, and permanent injunctive relief, specific 
performance and other equitable remedies, without bond or other security being required. In addition 

17 

 
 
 
 
 
to any other remedies to which the Company may be entitled at law or in equity or otherwise, in 
the event of a breach of any of the covenants or other obligations contained in this Agreement, the 
Company will be entitled to an accounting and repayment of all profits, compensation, royalties, 
commissions, remuneration or benefits which Employee directly or indirectly, has realized or may 
realize relating to, arising out of, or in connection with any such breach. Should a court of competent 
jurisdiction declare any of the covenants set forth in Article 5 or this Article 6 unenforceable, the 
court shall be empowered to modify and reform such covenants so as to provide relief reasonably 
necessary to protect the interests of the Company and Employee and to award injunctive relief, or 
damages, or both, to which the Company may be entitled. 

ARTICLE 7 
GENERAL PROVISIONS 

7.1.  Governing Law.  This Agreement shall be governed by and construed in accordance 

with the laws of the state of Colorado. 

7.2.  Assignability. This Agreement is personal to Employee and without the prior written 
consent of the Company shall not be assignable by Employee other than by will or the laws of 
descent  and  distribution.  This Agreement  shall  inure  to  the  benefit  of  and  be  enforceable  by 
Employee’s legal representatives and heirs.  This Agreement shall also inure to the benefit of and 
be binding upon the Company and its successors and assigns. 

7.3.  Withholding.  The Company may withhold from any amounts payable under this 
Agreement such federal, state or local taxes as shall be required to be withheld pursuant to any 
applicable law or regulation. 

7.4. 

Entire Agreement; Amendment. This Agreement constitutes the  entire agreement 
and understanding between Employee and the Company with respect to the subject matter hereof 
and,  except  as  otherwise  expressly  provided  herein,  supersedes  any  prior  agreements  or 
understandings, whether written or oral, with respect to the subject matter hereof, including without 
limitation  all  employment,  severance  or  change  of  control  agreements  previously  entered  into 
between Employee and the Company. Except as may be otherwise provided herein, this Agreement 
may not be amended or modified except by subsequent written agreement executed by both parties 
hereto. 

7.5. 

Section 409A. This Agreement is intended to comply with Section 409Ato the extent 
Section 409A  is  applicable  to  this  Agreement.  Notwithstanding  any  other  provision  of  this 
Agreement to the contrary, this Agreement shall be interpreted, operated and administered by the 
Company in a manner consistent with such intention and to avoid the pre-distribution inclusion in 
income of amounts deferred under this Agreement and the imposition of any additional tax or interest 
with respect thereto.  Notwithstanding any other provision of this Agreement to the contrary, to the 

18 

 
 
 
 
 
 
 
extent that any payment under this Agreement constitutes “nonqualified deferred compensation” 
under Section 409A, the following shall apply to the extent Section 409A is applicable to such 
payment: 

(a) 

Any  payable  that  is  triggered  upon  the  Employee’s  termination  of 
employment shall be paid only if such termination of employment constitutes a “separation from 
service” under Section 409A; and 

(b) 

All expenses or other reimbursements paid pursuant to this Agreement that 
are taxable income to Employee shall be paid no later than the end of the calendar year next following 
the calendar year in which Employee incurs such expense.  With regard to any provision herein that 
provides for reimbursement of costs and expenses or in-kind benefits, except as permitted by Section 
409A,  (a)  the  right  to  reimbursement  or  in-kind  benefits  shall  not  be  subject  to  liquidation  or 
exchange for another benefit, (b) the amount of expenses eligible for reimbursement, or in-kind 
benefits, provided during any taxable year shall not affect the expenses eligible for reimbursement, 
or in-kind benefits to be provided, in any other taxable year; and (c) such payments shall be made 
on or before the last day of Employee’s taxable year following the taxable year in which the expense 
occurred.  For purposes of Section 409A, Employee’s right to receive installment payments of any 
severance amount, if applicable, shall be treated as a right to receive a series of separate and distinct 
payments. 

In the event that Employee is deemed on the date of termination to be a “specified employee” as 
defined in Section 409A, then with regard to any payment or the provision of any benefit that is 
subject to Section 409A and is payable on account of a separation from service (as defined in 
Section 409A), such payment or benefit shall be delayed for until the earlier of (a) the first 
business day of the seventh calendar month following such termination of employment, or (b) 
Employee’s death.  Any payments delayed by reason of the prior sentence shall be paid in a  
single lump sum, without interest thereon, on the date indicated by the previous sentence and any 
remaining payments due under this Agreement shall be paid as otherwise provided herein. 

7.6.  Multiple Counterparts.  This Agreement may be executed in multiple counterparts, 

each of which shall constitute an original, but all of which together shall constitute one Agreement. 

7.7.  Notices. Any notice provided for in this Agreement shall be deemed delivered upon 
deposit in the  United States  mails, registered or certified mail, addressed to the  party to whom 
directed at the addresses set forth below or at such other addresses as may be substituted therefor 
by notice given hereunder.  Notice given by any other means must be in writing and shall be deemed 
delivered only upon actual receipt. 

If to the Company: 

c/o Energy Fuels Resources (USA) Inc. 

19 

 
 
 
 
 
 
 
 
225 Union Blvd., Suite 600 
Lakewood, CO 80228 

Attention:  President and Chief Executive Officer 

If to Employee: 

David C. Frydenlund 
8228 Harbortown Place 
Lone Tree CO 80124 

7.8.  Waiver. The waiver of any term or condition of this Agreement, or any breach thereof, 
shall not be deemed to constitute the waiver of the same or any other term or condition of this 
Agreement, or any breach thereof. 

7.9. 

Severability.  In  the  event  any  provision  of  this  Agreement  is  found  to  be 
unenforceable or invalid, such provision shall be severable from this Agreement and shall not affect 
the enforceability or  validity of  any other provision of this Agreement.  If any provision of this 
Agreement is capable of two constructions, one of which would render the provision void and the 
other  that  would  render  the  provision  valid,  then  the  provision  shall  have  the  construction  that 
renders it valid.. 

7.10.  Arbitration  of  Disputes.  Except  for  disputes  and  controversies  arising  under 
Articles 5 or 6 or involving equitable or injunctive relief, any dispute or controversy arising under 
or in connection with this Agreement shall be conducted in accordance with the Colorado Rules of 
Civil Procedure and, unless the parties mutually agree on an arbitrator shall be arbitrated by striking 
from a list of potential arbitrators provided by the Judicial Arbiter Group in Denver, Colorado.  If 
the parties are unable to agree on an arbitrator, the arbitrator will be selected from a list of seven 
(7) potential  arbitrators  provided  by  the  Judicial Arbiter  Group  in  Denver.  The  Company  and 
Employee will flip a coin to determine who will make the first strike. The parties will then alternate 
striking from the list until there is one arbitrator remaining, who will be the selected arbitrator. 
Unless the parties otherwise agree and subject to the availability of the arbitrator, the arbitration 
will be heard within sixty (60) days following the appointment, and the decision of the arbitrator 
shall be binding on Employee and the Company and will not be subject to appeal.  Judgment may 
be entered on the arbitrator’s award in any court having jurisdiction. 

7.11.  Currency.  Except  as  expressly  provided  in  this Agreement,  all  amounts  in  this 

Agreement are stated and shall be paid in United States dollars ($US). 

7.12.  Company’s  Maximum  Obligations.  The  compensation  set  out  in  this Agreement 
represents the Company’s maximum obligations, and other than as set out herein, Employee will 

20 

 
 
 
 
 
 
 
not  be  entitled  to  any  other  compensation,  rights  or  benefits  in  connection  with  Employee’s 
employment or the termination of Employee’s employment. 

7.13.  Full Payment;  No Mitigation Obligation.  The Company’s obligation to make the 
payments provided for in this Agreement and otherwise to perform its obligations hereunder shall 
be subject to any set-off, counterclaim, recoupment, defense or other claim, right or action which 
the Company may have against Employee. 

IN WITNESS WHEREOF, the parties have executed this Agreement as of the Effective 

Date. 

ENERGY FUELS INC. 

By: 

/s/ Mark S. Chalmers 

Name:  Mark S. Chalmers 
Title:  President and Chief Executive Officer 
Date:   February 14, 2018 

ENERGY FUELS RESOURCES (USA) INC. 

By: 

/s/ Mark S. Chalmers 

Name:  Mark S. Chalmers 
Title:  President and Chief Executive Officer 
Date:   February 14, 2018 

/s/ David C. Frydenlund 

By: 
Name:  David C. Frydenlund 
Title:  Chief Financial Officer, General Counsel 
and Corporate Secretary 
Date:   February 14, 2018 

21 

 
 
 
 
 
 
 
 
 
 
 
EXHIBIT A 
JOB DESCRIPTION 

1.  As Chief Financial Officer: 

Employee shall be responsible for overseeing the financial activities of Energy Fuels Inc. and its 
subsidiaries. 

Essential duties and responsibilities include: 

•  as requested by the CEO, contributing to the development and achievement of strategic 

objectives for the Company 

•  overseeing the financial planning and budgeting processes for the organization 
•  overseeing the preparation of the Company’ financial statements and MD&A and 

providing certification as required by applicable securities laws 

•  overseeing the Company’s internal control procedures 
•  along with the CEO, playing a key role in executing public and private market capital 

raising initiatives 

•  as requested by the CEO, playing a role in the Company’s investor relations activities 
•  managing relationships with potential lenders to the Company 
•  as requested by the CEO, assisting the CEO with the identification, negotiating and 

execution of M&A and/or similar transactions 

•  playing an integral role along with the CEO in developing and maintaining relationships 

with investment banking firms 

2.  As General Counsel and Corporate Secretary: 

Employee shall be responsible for the legal administration of Energy Fuels Inc. and its 
subsidiaries (“Energy Fuels”), the compliance with public company and stock exchange matters, 
the coordination of international and domestic business transactions, the evaluation of enterprise 
risks and generally, all domestic and international legal, regulatory and environmental matters 
relating to Energy Fuels.  Employee will work closely with senior operations, regulatory and 
permitting personnel. 

Essential duties and responsibilities include: 

•  managing all legal matters relating to Energy Fuels’ activities, including management of 

• 

all outside counsel retained by Energy Fuels 
supporting the CEO and senior management in all legal aspects of commercial, corporate, 
financing, M&A, planning and other matters 

•  being responsible for all corporate secretarial matters for Energy Fuels, including: 

corporate maintenance of all entities; calling and holding all director and committee 
meetings for all such entities; calling and holding all shareholders meetings for all such 
entities ensuring compliance with all stock exchange and securities law requirements 

22 

 
 
 
 
 
 
 
maintaining appropriate corporate records for all such entities; and making all applicable 
corporate, securities law and stock exchange filings 

•  ensuring that Energy Fuels’ operations are provided with the legal and regulatory support 
necessary to be able to operate in compliance with all applicable licenses, permits, laws 
and regulations, including providing training as necessary and ensuring that operations 
personnel are apprised of all applicable license, permit, legal and regulatory requirements 
and any changes thereto 

• 

•  establishing strategies for dealing with state and federal regulatory agencies, and meeting 
with and negotiating with regulatory authorities, in coordination with senior operations, 
regulatory and permitting personnel 
reviewing license and permit applications, amendments and renewals for compliance 
with applicable legal and regulatory requirements, as necessary, and developing specific 
language for licenses, permits, negotiated consent agreements, orders, and other binding 
agreements affecting Energy Fuels’ operations, as necessary 
interpreting license and permit conditions, laws and regulations applicable to Energy 
Fuels’ operations and assisting operations personnel in interpreting such conditions, 
requirements and any changes thereto 

• 

•  coordinating responses to “requests for information” and addressing matters of non- 

compliance with regulatory authorities, in coordination with senior operations, regulatory 
and permitting personnel 

•  managing all litigation and legal and regulatory challenges 

3.  General: 

Employee shall report to the President and Chief Executive Officer of the Company. 

This position will be located in the Lakewood office with frequent travel. 

Performance is to be based on Performance Goals set under the Company’s STIP and LTIP, 
which will be evaluated once per year. 

23 

 
 
 
EMPLOYMENT AGREEMENT 

THIS EMPLOYMENT AGREEMENT (“Agreement”) is effective as of the 14th  day of 
February, 2018 (the “Effective Date”), by and between Energy Fuels Resources (USA) Inc., a 
Delaware corporation (“EFRI”), Energy Fuels Inc., an Ontario corporation (“EFI”) (EFRI and EFI 
are collectively referred to herein as the “Company”) and William Paul Goranson (“Employee”). 

In consideration of the agreements contained in this Agreement, and other good and valuable 
consideration, the receipt and sufficiency of which are hereby acknowledged, the Company and 
Employee hereby agree as follows: 

ARTICLE 1 
EMPLOYMENT, REPORTING AND DUTIES 

1.1. 

Employment.  The Company hereby employs and engages the services of Employee 
to serve as Chief Operating Officer, and Employee agrees to diligently and competently serve as 
and  perform  the  functions  of  Chief  Operating  Officer  for  the  compensation  and  benefits  stated 
herein. A copy of Employee’s current job description is attached hereto as Exhibit A, and Company 
and Employee agree and acknowledge that, subject to Section 4.2(b), Company retains the right to 
reasonably add to, or remove, duties and responsibilities set forth in that job description as business 
or other operating reasons may arise for changes to occur.  It is understood that Employee will be 
appointed an officer of EFI and EFRI during the term of this Agreement, but that Employee’s direct 
employment relationship will be as an employee of EFRI. 

1.2. 

Fulltime  Service.  Excluding  any  periods  of  vacation  and  sick  leave  to  which 
Employee may be entitled, Employee agrees to devote Employee’s full time and energies to the 
responsibilities with the Company consistent with past practice and shall not, during the Term of 
this Agreement, be engaged in any business activity which would interfere with or prevent Employee 
from carrying out Employee’s duties under this Agreement. 

ARTICLE 2 
COMPENSATION AND RELATED ITEMS 

2.1.  Compensation. 

As  compensation  and  consideration  for  the  services  to  be  rendered  by  Employee  under  this 
Agreement, the Company agrees to pay Employee and Employee agrees to accept: 

(a) 

Base Salary and Benefits.  A base salary (“Base Salary”) of $270,864 per 
annum,  less  required  tax  withholding,  which  shall  be  paid  in  accordance  with  the  Company’s 
standard payroll practice.  Employee’s Base Salary may be increased from time to time (but not 
decreased, including after any increase, without Employee’s written consent), at the discretion of 
1 

 
 
 
 
 
 
 
 
 
 
 
the Company, and after any such change, Employee’s new level of Base Salary shall be Employee’s 
Base  Salary  for  purposes  of  this Agreement  until  the  effective  date  of  any  subsequent  change. 
Employee shall also receive benefits such as health insurance, vacation and other benefits consistent 
with  the  then  applicable  Company  benefit  plans  to  the  same  extent  as  other  employees  of  the 
Company with similar position or level.  Employee understands and agrees that, subject to Sections 
2.1(b) and (c) below, Company’s benefit plans may, from time to time, be modified or eliminated 
at Company’s discretion. 

(b) 

Cash  Bonus.  A cash  bonus  opportunity  (the  “Cash  Bonus”)  during  each 
calendar year with a target (the “Target Cash Bonus”) equal to forty percent (40%) (the “Target 
Cash Bonus Percentage”) of Employees’ Base Salary for the year in which the cash bonus is paid, 
such cash bonus to be paid in accordance with the Company’s existing Short Term Incentive Plan, 
as such plan may be amended or replaced from time to time, or the equivalent (the “STIP”). Pursuant 
to the terms of the STIP, each annual Cash Bonus shall be payable based on the achievement of 
performance goals, and may be higher or lower than the Target Cash Bonus based on achievement 
of  those  goals. For  each  calendar  year  during  the  term  of  this Agreement,  the  Board  (or  the 
Compensation Committee) of EFI will determine and will establish in writing (i) the applicable 
STIP performance  goals,  which  shall  be  reasonably  achievable  and  if  achieved  would  result  in 
payment of the Target Cash Bonus,  (iii) the  percentage of annual Base Salary to be payable to 
Employee if some lesser or greater percentage of the annual STIP performance goals are achieved, 
and (iv) such other applicable terms and conditions of the STIP necessary to satisfy the requirements 
of Section 409A (“Section 409A”) of the Internal Revenue Code of 1986, as amended (the "Code"); 
and 

(c) 

Equity Award.  An equity award opportunity (the “Equity Award”) during 
each calendar year with a target value (the “Target Equity Award”) equal to eighty percent (80%) 
(the “Target Equity Award Percentage”) of Employee’s Base Salary for the year in which the 
award is granted, such equity award to be awarded in accordance with the Company’s existing Long 
Term Incentive Plan, as such plan may be amended or replaced from time to time, or the equivalent 
(the “LTIP”).  Pursuant to the terms of the LTIP, each annual equity award shall be made based on 
the achievement of performance goals, and may be higher or lower than the Target Equity Award 
based on achievement of those goals. For each calendar year during the term of this Agreement, 
the Board (or the Compensation Committee) of EFI will determine and will establish in writing (i) 
the applicable LTIP performance goals, which shall be reasonably achievable and if achieved would 
result in payment of the Target Equity Award, (iii) the percentage of annual Base Salary value to 
be  awarded  in  equity  to  Employee  if  some  lesser  or  greater  percentage  of  the  annual  LTIP 
performance goals are achieved, and (iv) such other applicable terms and conditions of the LTIP 
necessary to satisfy the requirements of Section 409A of the Code. 

2.2.  Annual  Medical.  The  Company  will  reimburse  Employee  for   the  cost  of  a 
comprehensive  annual  medical  examination  for  each  year  of  this  Agreement,  provided  that 
Employee requests such reimbursement and such reimbursement is made no later than the last day 
2 

 
 
 
 
of the calendar year following the calendar year in which the examination expense was incurred. 
Employee will promptly notify the President & CEO if the annual medical examination reveals any 
condition which, if untreated is likely to interfere with Employee’s ability to perform the essential 
requirements of his or her position, and if requested by the President & CEO, Employee will provide 
the details of the condition and the potential impact on his or her ability to perform the essential 
requirements  of  his  or  her  position  to  enable  the  President  &  CEO  to  determine  how  best  to 
accommodate Employee and protect the critical business interests of the Company. 

2.3. 

Expenses.  The  Company  agrees  that  Employee  shall  be  allowed  reasonable  and 
necessary business expenses in connection with the performance of Employee’s duties within the 
guidelines  established  by  the  Company  as  in  effect  at  any  time  with  respect  to  key  employees 
(“Business Expenses”), including, but not limited to, reasonable and necessary expenses for food, 
travel,  lodging,  entertainment  and  other  items  in  the  promotion  of  the  Company  within  such 
guidelines. The Company shall promptly reimburse Employee for all reasonable Business Expenses 
incurred by Employee upon Employee’s presentation to the Company of an itemized account thereof, 
together with receipts, vouchers, or other supporting documentation. 

2.4.  Vacation.  Employee will be entitled to four weeks of vacation each year, in addition 
to the 10 paid holidays each year.  Carry over from one year to the next will be as per the Company’s 
paid leave policy. 

2.5.  Use of Company Vehicle.  Employee will be provided the full time use of a suitable 
vehicle for travel between the Lakewood office and home as well as for business travel to field sites 
as required, or the equivalent. 

ARTICLE 3 
TERMINATION 

3.1. 

Term.  Employee’s  employment  under  this  Agreement  shall  commence  on  the 
Effective Date and will end on the date (the “Initial Expiration Date”) that is the second anniversary 
of the Effective Date, unless terminated sooner under the provisions of this Article, or extended 
under the terms of this Section.  If neither Company nor Employee provides written notice of intent 
not to renew this Agreement by ninety (90) days prior to the Initial Expiration Date, this Agreement 
shall  be  automatically  renewed  for  twelve  (12)  additional months,  and  if neither  Company  nor 
Employee provides written notice of intent not to renew this Agreement prior to ninety (90) days 
before the end of such additional 12-month period, this Agreement shall continue to be automatically 
renewed for successive additional 12-month periods until such time either Company or Employee 
provides written notice of intent not to renew prior to ninety (90) days before the end of any such 
renewal period. 

3 

 
 
 
 
 
 
3.2. 

Termination  of  Employment.  Except  as  may  otherwise  be  provided  herein, 

Employee’s employment under this Agreement may terminate upon the occurrence of: 

(a) 

Notice by Company. The termination date specified in a written notice of 

termination that is given by the Company to Employee; 

(b) 

Notice by Employee.  Thirty (30) days after written notice of termination is 

given by Employee to the Company; 

(c) 
Employee’s becoming disabled; 

Death or  Disability.  Employee’s  death  or,  at the  Company’s  option, upon 

(d) 

Deemed  Termination  Without  Just  Cause  upon  a  Change  of  Control.  A 
deemed termination without just cause under Section 4.1(a) upon the occurrence of a Change of 
Control; or 

(e) 

Notice Not to Renew.  If the Company or Employee gives the other a notice 
not to renew this Agreement under Section 3.1, employment under this Agreement shall terminate 
at the close of business at the end of the Initial Expiration Date or at the end of the 12-month renewal 
period in which timely notice not to renew was given, as the case may be. A notice by the Company 
not to renew shall be considered a notice of termination, resulting in the Company terminating 
Employee’s employment under this Agreement. 

Any notice of termination given by the Company to Employee under Section 3.2(a) or (e) above 
shall specify whether such termination is with or without just cause as defined in Section 3.4.  Any 
notice of termination given by Employee to the Company under Section 3.2(b) above shall specify 
whether such termination is made with or without Good Reason as defined in Section 4.2(b). 

3.3.  Obligations of the Company Upon Termination. 

(a)  With  Just  Cause/Without  Good  Reason.  If  the  Company  terminates 
Employee’s  employment  under  this Agreement  with  just  cause  as  defined  in  Section  3.4,  or  if 
Employee terminates his employment without Good Reason as defined in Section 4.2(b), in either 
case whether before or after a Change of Control as defined in Section 4.2(a), then Employee’s 
employment  with  the  Company  shall  terminate  without  further  obligation  by  the  Company  to 
Employee,  other  than  payment  of  all  accrued  obligations  (“Accrued  Obligations”),  including 
outstanding  Base  Salary,  accrued  vacation  pay  and  any  other  cash  benefits  accrued  up  to  and 
including the date of termination.  That payment shall be made in one lump sum, less required tax 
withholding, within ten (10) working days after the effective date of such termination.  Employee 
will  have  up  to  the  earlier  of:  (A)  ninety  (90)  days  from  the  effective  date  of  termination  of 
Employee’s employment; or (B) the date on which the exercise period of the particular stock option 
expires, to exercise only that portion of the stock options previously granted to Employee that have 

4 

 
 
 
 
 
 
 
 
 
not been exercised, but which have vested, and thereafter Employee’s stock options will expire and 
Employee  will  have  no  further  right  to  exercise  the  stock  options.  Any  stock  options  held  by 
Employee that are not yet vested at the termination date immediately expire and are cancelled and 
forfeited to the Company on the termination date.  Any Restricted Stock Units (“RSUs”) held by 
Employee that have vested on or before the termination date shall be paid (or the shares issuable 
thereunder issued) to Employee.  Any RSUs held by Employee that are not vested on or before the 
termination date will be immediately cancelled and forfeited to the Company on the termination 
date.  The rights of Employee upon termination in respect of any other awards granted to Employee 
under any of the Company’s equity compensation plans shall be as set forth in such plans or in the 
award agreement for any such awards, as applicable. Notwithstanding the foregoing, on retirement, 
Employee will have up to the earlier of: (A) one hundred and eighty (180) days from the effective 
date of retirement; or (B) the date on which the exercise period of the particular stock option expires, 
to exercise only that portion of the stock options previously granted to Employee that have not been 
exercised, but which have vested, and thereafter Employee’s stock options will expire and Employee 
will have no further right to exercise the stock options. 

(b)  With  Good  Reason/Without  Just  Cause/Disabled/Death.  If  Employee 
terminates Employee’s employment under this Agreement for Good Reason as defined in Section 
4.2(b), or  if  the  Company  terminates  Employee’s  employment without  just  cause as  defined  in 
Section  3.4,  or  if  the  Company  terminates  Employee’s  employment  by  reason  of  Employee 
becoming  Disabled  as  defined  in  Section  3.5,  or  if  Employee  dies  (in  which  case  the  date  of 
Employee’s death shall be considered his or her termination date), in any case whether before or 
after a Change of Control as defined in Section 4.2(a), or if there is a deemed termination without 
just  cause  upon  a  Change  of  Control  as  contemplated  by  Section  4.1(a),  then  Employee’s 
employment with the Company shall terminate, as of the effective date of the termination, and in 
lieu of any other severance benefit that would otherwise be payable to Employee: 

(i) 

the Company shall pay the following amounts to Employee (or, in 
the case of termination by reason of Employee becoming Disabled or upon the death 
of Employee, to Employee’s legal representative or estate as applicable) after the 
effective date of such termination, or in a manner and at such later time as specified 
by Employee (or Employee’s legal representative), and agreed to by the Company, 
subject to being in compliance with Section 409A of the Code: 

(A) 

all Accrued Obligations, less required tax withholding, up to 
and including the date of termination, to be paid on the date of termination 
of employment, or within no more than five (5) working days thereafter, and 
the Company will reimburse the Employee for all proper expenses incurred 
by the Employee in discharging his responsibilities to the Company prior to 
the  effective  date  of  termination  of  the  Employee’s  employment  in 
accordance with Section 2.3 above; and 

5 

 
 
 
 
(B) 

an  amount  in  cash  equal  to  one  and  one  half  (1.5)  (the 
“Severance Factor”) times the sum of Employee’s Base Salary, Target Cash 
Bonus  and  Target  Equity  Award  for  the  full  year  in  which  the  Date  of 
Termination occurs, less required tax withholding, such amount to be paid 
within thirty (30) calendar days after the date Employee signs the Release 
contemplated by Section 3.7; 

(ii) 

Employee  or  Employee’s  legal  representative  will  have  up  to  the 
earlier of: (A) ninety (90) days from the effective date of termination of Employee’s 
employment for all cases other than the death of Employee and twelve (12) months 
from the effective date of termination of Employee’s employment in the  case of 
death of Employee; or (B) the date on which the exercise period of the particular 
stock option expires, to exercise only that portion of the stock options previously 
granted  to  Employee  that  have  not  been  exercised,  but  which  have  vested,  and 
thereafter Employee’s stock options will expire and Employee or his or her legal 
representative will have no further right to exercise the stock options.  Subject to 
Section 4.1(c), any stock options held by Employee that are not yet vested at the 
termination date immediately expire and are cancelled and forfeited to the Company 
on the termination date.  Any RSUs held by Employee that have vested on or before 
the  termination  date  shall  be  paid  (or  the  shares  issuable  thereunder  issued)  to 
Employee or his or her legal representative or estate as applicable. Subject to Section 
4.1(c), any RSUs held by Employee that are not vested on or before the termination 
date will be immediately cancelled and forfeited to the Company on the termination 
date.  Subject  to  Section  4.1(c),  the  rights  of  Employee  or  his  or  her  legal 
representative or estate as applicable upon termination in respect of any other awards 
granted to Employee under any of the Company’s equity compensation plans shall 
be as  set forth  in such  plans  or in  the  award  agreement for  any  such awards,  as 
applicable; 

(iii)  Upon  termination,  the  Company  or  its  Successor  (as  defined  in 
Section  4.1(a)),  agrees  to  reimburse  Employee  the  full  cost  of  the  COBRA 
continuation rate charged for employee and dependent coverage, through the EFRI 
Health and Welfare Plan on a monthly basis, for a period of months equal to twelve 
times  the  Severance  Factor  (the  “Coverage  Period”),  beyond  Employee’s 
termination  month.  Employee  and  his  or  her  dependents  may,  at  their  choosing, 
enroll in the COBRA continuation plan through EFRI for the first eighteen months 
following Employee’s termination month or, if they choose, they may enroll in a 
separate plan of their choosing, by using the reimbursement to enroll in medical and 

6 

 
 
 
 
 
 
prescription insurance of their choosing. Reimbursement at the rate described herein 
will continue for the Coverage Period beyond Employee’s termination month, but 
beginning with the nineteenth month, Employee and his or her dependents will need 
to obtain coverage from a different source than the COBRAcontinuation plan through 
EFRI.  The reimbursement will be to Employee and his or her dependents directly, 
and will be grossed up so that there is no negative tax impact to the Employee or his 
or dependents for coverage of the premiums charged by the insurance carriers for 
the COBRA continuation coverage for the current month of reimbursement. The 
reimbursed cost of COBRA coverage will be indexed annually, and will match the 
rate charged for any month of coverage available by the insurance carrier for Medical, 
Dental, and Optical coverage through EFRI for employee and spouse coverage. Both 
Employee and his or her dependents, will have the option of purchasing a medical 
plan separate from the plan offered by EFRI; and 

(iv)  Nothing herein shall preclude the Company from granting additional 

severance benefits to Employee upon termination of employment. 

Notwithstanding the foregoing, in the  case of Disability, any  Base Salary  payable to Employee 
during the one hundred and eighty (180) day period of disability will be reduced by the amount of 
any  disability  benefits  Employee  receives  or  is  entitled  to  receive  as  a  result  of  any  disability 
insurance policies for which the Company has paid the premiums. 

(c) 

Section 280G.  Notwithstanding any other provisions of this Agreement, or 
any other plan, arrangement or agreement to the contrary, if any of the payments or benefits provided 
or to be provided by the Company or its affiliates to Employee or for Employee’s benefit pursuant 
to the terms of this Agreement or otherwise (“Covered Payments”) constitute “parachute payments” 
within the meaning of Section 280G of the Code and would, but for this Section 3.3(c) be subject 
to the excise tax imposed under Section 4999 of the Code (or any successor provision thereto) or 
any similar tax imposed by state or local law or any interest or penalties with respect to such taxes 
(collectively, the “Excise Tax”), then the following shall apply: 

(i) 

If the Covered Payments, reduced by the sum of (1) the Excise Tax 
and (2) the total of the Federal, state, and local income and employment taxes payable 
by Employee on the amount of the Covered Payments which are in excess of three 
times Employee’s “base amount” within the meaning of Section 280(G) of the Code 
less one dollar (the “Threshold Amount”), are greater than or equal to the Threshold 
Amount, Employee shall be entitled to the full benefits payable under this Agreement; 
and 

(ii) 

If the Threshold Amount is less than (1) the Covered Payments, but 
greater than (2) the Covered Payments reduced by the sum of (x) the Excise Tax and 

7 

 
 
 
 
 
 
(y) the total of the Federal, state, and local income and employment taxes on the 
amount of the Covered Payments which are in excess of the Threshold Amount, then 
the Covered Payments shall be reduced (but not below zero) to the extent necessary 
so that the sum of all Covered Payments shall not exceed the Threshold Amount.  In 
such event, the Covered Payments shall be reduced in the following order:  (A) cash 
payments not subject to Section 409A; (B) cash payments subject to Section 409A; 
(C) equity-based payments and acceleration; and (D) non-cash forms of benefits. 
To the extent any payment is to be made over time (e.g., in installments, etc.), then 
the payments shall be reduced in reverse chronological order. 

The  determination  as  to  which  of  the  alternative  provisions  of  Section  3.3(c)(ii)  shall  apply  to 
Employee shall be made by a nationally recognized accounting firm selected by the Company (the 
“Accounting Firm”), which shall provide detailed supporting calculations both to the Company 
and Employee within 15 business days of the date of termination, if applicable, or at such earlier 
time as is reasonably requested by the Company or  Employee.  For purposes of determining which 
of the alternative provisions of Section 3.3(c)(ii) shall apply, Employee shall be deemed to pay 
Federal income taxes at the highest marginal rate of Federal income taxation applicable to individuals 
for the calendar year in which the determination is to be made, and state and local income taxes at 
the highest marginal rates of individual taxation in the state and locality of Employee’s residence 
on the date of termination, net of the maximum reduction in Federal income taxes which could be 
obtained from deduction of such state and local taxes.  Any determination by the Accounting Firm 
shall be binding upon the Company and Employee. 

3.4.  Definition of Just Cause. 

As used in this Agreement, the term “just cause” will mean any one or more of the following events: 

(a) 

theft,  fraud,  dishonesty,  or  misappropriation  by  Employee  involving  the 
property, business or affairs of the Company or the discharge of Employee’s responsibilities or the 
exercise of his or her authority; 

(b) 

willful misconduct or the willful failure by Employee to properly discharge 

his or her responsibilities or to adhere to the policies of the Company; 

(c) 

Employee’s gross negligence in the discharge of his or her responsibilities 
or  involving  the  property,  business  or  affairs  of  the  Company  to  the  material  detriment  of  the 
Company; 

(d) 

Employee’s conviction of a criminal or other statutory offence that constitutes 
a felony or which has a potential sentence of imprisonment greater than six (6) months or Employee’s 
conviction of a criminal or other statutory offence involving, in the sole discretion of the Board of 
Directors of EFI, moral turpitude; 

8 

 
 
 
 
 
 
 
 
(e) 

(f) 

or 6 below; 

Employee’s material breach of a fiduciary duty owed to the Company; 

any material breach by Employee of the covenants contained in Articles 5 

(g) 

Employee’s unreasonable refusal to follow the lawful written direction of 

the President and Chief Executive Officer of the Company on any material matter; 

(h) 

any conduct of Employee which, in the reasonable opinion of the President 
and Chief Executive Officer of the Company or Board of Directors of EFI, is materially detrimental 
or embarrassing to the Company; or 

(i) 

any other conduct by Employee that would constitute “just cause” as that 

term is defined at law. 

The Company must provide written notice to Employee prior to termination for just cause pursuant 
to Section 3.4 (c), (f), (g), (h), or (i) and provide Employee the opportunity to correct and cure the 
failure within thirty (30) days from the receipt of such notice.  If the parties disagree as to whether 
the Company had just cause to terminate the Employee’s employment, the dispute will be submitted 
to binding arbitration pursuant to Section 7.10 below. 

3.5.  Definition of Disabled.  As used herein, “Disabled” shall mean a mental or physical 
impairment which, in the reasonable opinion of a qualified doctor selected by mutual agreement of 
the  Company  and  Employee  acting  reasonably,  renders  Employee  unable,  with  reasonable 
accommodation, to perform with reasonable diligence the essential functions and duties of Employee 
on a full-time basis in accordance with the terms of this Agreement, which inability continues for 
a period of not less than 180 consecutive days.  The providing of service to the Company for up to 
two (2) three (3) day periods during the one hundred and eighty (180) day period of disability will 
not affect the determination as to whether Employee is Disabled and will not restart the one hundred 
and eighty (180) day period of disability. If any dispute arises between the parties as to whether 
Employee is Disabled, Employee will  submit to an examination by a physician selected by the 
mutual agreement of the Company and Employee acting reasonably, at the Company’s expense. 
The decision of the physician will be certified in writing to the Company, and will be sent by the 
Physician to Employee or Employee’s legally authorized representative, and will be conclusive for 
the purposes of determining whether Employee is Disabled. If Employee fails to submit to a medical 
examination within twenty (20) days after the Company’s request, Employee will be deemed to 
have voluntarily terminated his or her employment. 

3.6.  Return  of  Materials;  Confidential  Information.  In  connection  with  Employee’s 
separation from employment for any reason, Employee shall return any and all physical property 
belonging to the Company, and all material of whatever type containing “Confidential Information” 
as defined in Section 5.2 below, including, but not limited to, any and all documents, whether in 

9 

 
 
 
 
 
 
 
 
 
paper  or  electronic  form,  which  contain  Confidential  Information,  any  customer  information, 
production information, manufacturing-related information, pricing information, files, memoranda, 
reports, pass codes/access cards, training or other reference manuals, Company vehicle, telephone, 
gas cards or other Company credit cards, keys, computers, laptops, including any computer disks, 
software, facsimile machines, memory devices, printers, telephones, pagers or the like. 

3.7.  Delivery of Release.  Within ten (10) working days after termination of Employee’s 
employment, and as a condition for receipt of payments set forth in Section 3.3(b)(i)(B), 3.3(b)(iii), 
and 4.1(a), the Company shall provide to Employee, or Employee’s legal representative, a form of 
written release, which form shall be satisfactory to the Company and generally consistent with the 
form of release used by the Company prior to such termination of employment (the “Release”) and 
which shall provide a full release of all claims against the Company and its corporate affiliates, 
except  where  Employee  has  been  named  as  a  defendant  in  a  legal  action  arising  out  of  the 
performance of Employee’s responsibilities in which case the Release will exempt any claims which 
Employee or his or her legal representative or estate may have for indemnity by the Company with 
respect to any such  legal action. As  a condition to the  obligation of  the  Company to make the 
payments provided for in such Sections Employee, or Employee’s legal representative, shall execute 
and deliver the Release to the Company within the time periods provided for in said release. 

ARTICLE 4 
CHANGE OF CONTROL 

4.1. 

Effect of Change of Control.  In the event of a Change of Control of EFI during the 

term of this Agreement, or any renewal of this Agreement the following provisions shall apply: 

(a) 

If upon the Change of Control 

(i) 

Employee is not retained by EFI or its successor (whether direct or 
indirect,  by  purchase  of  assets,  merger,  consolidation,  exchange  of  securities, 
amalgamation, arrangement or otherwise) to all or substantially all of the business 
and/or assets of EFI (“Successor”) on the same terms and conditions as set out in 
this Agreement and in circumstances that would not constitute Good Reason (where 
Good Reason is determined by reference to Employee’s employment status prior to 
the  Change  of  Control  and  prior  to  any  other  event  that  could  constitute  Good 
Reason); and/or 

(ii) 

any such Successor does not, by agreement in form and substance 
satisfactory to Employee, expressly assume and agree to perform this Agreement in 
the same manner and to the same extent that EFI would be required to perform it if 
no such succession had taken place, 

10 

 
 
 
 
 
 
 
then Employee shall be deemed to be terminated without just cause upon such Change of Control 
and shall be entitled to the compensation and all other rights specified in Article 3 in the same 
amount and on the same terms as if terminated without just cause as set out therein, subject to the 
additional rights set out in paragraph (c) below; 

(b) 

All rights of Employee in this Agreement, including without limitation all 
rights to severance and other rights upon a termination with or without cause, with or without Good 
Reason, upon a disability or upon death under Article 3 of this Agreement shall continue after a 
Change of Control in the same manner as before the Change of Control, subject to the additional 
rights set out in paragraph (c) below; 

(c) 

if, 

(i) 

there is a deemed termination without cause under Section 4.1(a); or 

(ii) 

within twelve (12) months following the effective date of the Change 
of Control, EFI, or its successor, terminates the employment of Employee without 
just cause or by reason of Disability, or Employee terminates his or her employment 
under this Agreement for Good Reason, 

then, in addition to the other rights Employee has under this Agreement, and notwithstanding any 
other provision in this Agreement, all of the stock options previously granted to Employee that have 
neither vested nor expired will automatically vest and become immediately exercisable, any period 
of  restriction  and  other  restrictions  imposed  on  all  RSUs  shall  lapse,  and  all  RSUs  shall  be 
immediately settled and payable, and all other securities awarded shall vest and/or accelerate in 
accordance with Article 16 of the EFI Omnibus Equity Incentive Plan or the comparable provisions 
of any other equity incentive plan under which such securities may have been issued. Employee 
will have ninety (90) days from the effective date of the termination of Employee’s employment to 
exercise any stock options which had vested as of the effective date of termination and thereafter 
Employee’s stock options will expire and Employee will have no further right to exercise the stock 
options. 

4.2.  Definitions  of  Change  of  Control  and  Good  Reason.  For  the  purposes  of  this 

Agreement, 

(a) 

“Change of Control” will mean the happening of any of the following events: 

(i) 

any transaction at any time and by whatever means pursuant to which 
(A) EFI goes out of existence by any means, except for any corporate transaction or 
reorganization in which the proportionate voting power among holders of securities 
of  the  entity  resulting  from  such  corporate  transaction  or  reorganization  is 
substantially  the  same  as  the  proportionate  voting  power  of  such  holders  of  EFI 
voting securities immediately prior to such corporate transaction or reorganization 

11 

 
 
 
 
 
 
 
 
 
or (B) any Person (as defined in the Securities Act (Ontario)) or any group of two 
or  more  Persons  acting  jointly  or  in  concert  (other  than  EFI,  a  wholly-owned 
Subsidiary of EFI, an employee benefit plan of EFI or of any of its wholly-owned 
Subsidiaries (as defined in the Securities Act (Ontario)), including the trustee of any 
such  plan  acting  as  trustee)  hereafter  acquires  the  direct  or  indirect  “beneficial 
ownership” (as defined by the Business Corporations Act (Ontario)) of, or acquires 
the right to exercise control or direction over, securities of EFI representing 50% or 
more  of  EFI’s  then  issued  and  outstanding  securities  in  any  manner  whatsoever, 
including, without limitation, as a result of a take-over bid, an exchange of securities, 
an  amalgamation  of  EFI  with  any  other  entity,  an  arrangement,  a  capital 
reorganization or any other business combination or reorganization; 

(ii) 

the sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, whether or not related, to a Person 
or any group of two or more Persons acting jointly or in concert, other than a wholly- 
owned Subsidiary of EFI; 

(iii) 

the dissolution or liquidation of EFI except in connection with the 
distribution  of  assets  of  EFI  to  one  or  more  Persons  which  were  wholly-owned 
Subsidiaries of EFI immediately prior to such event; 

(iv) 

the  occurrence  of  a  transaction  requiring  approval  of  EFI’s 
shareholders whereby EFI is acquired through consolidation, merger, exchange of 
securities, purchase of assets, amalgamation, arrangement or otherwise by any other 
Person  (other  than  a  short  form  amalgamation  or  exchange  of  securities  with  a 
wholly-owned Subsidiary of EFI); 

(v) 

a  majority  of  the  members  of  the  Board  of  Directors  of  EFI  are 
replaced or changed  as  a  result of or in  connection with any:  (A) take-over bid, 
consolidation, merger, exchange of securities, amalgamation, arrangement, capital 
reorganization  or  any  other  business  combination  or  reorganization  involving  or 
relating to EFI; (B) sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, or any purchase of assets; or (C) 
dissolution or liquidation of EFI; 

(vi) 

during any two-year period, a majority of the members of the Board 
of Directors of EFI serving at the date of this Agreement is replaced by directors 
who are not nominated and approved by the Board of Directors of EFI; 

(vii) 

an event set forth in (i), (ii), (iii), (iv), (v) or (vi) has occurred with 
respect to EFRI or any of its direct or indirect parent companies, in which case the 
term “EFI” in those paragraphs will be read to mean “EFRI or such parent company” 

12 

 
 
 
 
 
 
 
is: 

and the phrase “wholly-owned Subsidiary(ies)” will be read to mean “Affiliate(s) 
or wholly-owned Subsidiary(ies)”; or 

(viii) 

the Board of Directors of EFI passes a resolution to the effect that, 

an event set forth in (i), (ii), (iii), (iv), (v), (vi) or (vii) above has occurred. 

(b) 

“Good Reason” means, without the written agreement of Employee, there 

(i) 

a material reduction or diminution in the level of responsibility, or 
office  of  Employee,  provided  that  before  any  claim  of  material  reduction  or 
diminution of responsibility may be relied upon by Employee, Employee must have 
provided written notice to Employee’s supervisor and the EFI’s Board of Directors 
of the alleged material reduction or diminution of responsibility and have given EFI 
at least thirty (30) calendar days within which to cure the alleged material reduction 
or diminution of responsibility; 

(ii) 

a  reduction  in  the  Employee’s  Base  Salary,  Target  Cash  Bonus 

Percentage or Target Equity Award Percentage; or 

(iii) 

a  proposed,  forced  relocation  of  Employee  to  another  geographic 
location greater than fifty (50) miles from Employee’s office location at the time a 
move is requested after a Change of Control. 

ARTICLE 5 
CONFIDENTIALITY 

5.1. 

Position  of Trust and  Confidence.  Employee acknowledges that in  the  course of 
discharging his or her responsibilities, he or she will occupy a position of trust and confidence with 
respect to the affairs and business of the Company and its customers and clients, and that he or she 
will have access to and be entrusted with detailed confidential information concerning the present 
and contemplated mining and exploration projects, prospects, and opportunities of the Company. 
Employee acknowledges that the disclosure of any such confidential information to the competitors 
of the Company or to the general public would be highly detrimental to the best interests of the 
Company.  Employee  further  acknowledges  and  agrees  that  the  right  to  maintain  such  detailed 
confidential information constitutes a proprietary right which the Company is entitled to protect. 

5.2.  Definition  of  Confidential  Information.  In 

this  Agreement,  “Confidential 
Information” means any information disclosed by or on behalf of the Company to Employee or 
developed by Employee in the performance of his or her responsibilities at any time before or after 
the  execution  of  this Agreement,  and  includes  any  information,  documents,  or  other  materials 
(including, without limitation, any drawings, notes, data, reports, photographs, audio and/or video 

13 

 
 
 
 
 
 
 
 
 
 
 
recordings, samples and the like) relating to the business or affairs of the Company or its respective 
customers, clients or suppliers that is confidential or proprietary, whether or not such information: 

(i) 

is reduced to writing; 

(ii) 

was created or originated by an employee; or 

(iii) 

is designated or marked as “Confidential” or “Proprietary” or some 

other designation or marking. 

The Confidential Information includes, but is not limited to, the following categories of information 
relating to the Company: 

(a) 

information  concerning  the  present  and  contemplated  mining,  milling, 
processing and exploration projects, prospects and opportunities, including joint venture projects, 
of the Company; 

(b) 

information  concerning  the  application  for  permitting  and  eventual 
development or construction of the Company’s properties, the status of regulatory and environmental 
matters, the compliance status with respect to licenses, permits, laws and regulations, property and 
title matters and legal and litigation matters; 

(c) 

information  of  a  technical  nature  such  as  ideas,  discoveries,  inventions, 
improvements, trade secrets, now-how, manufacturing processes, specifications, writings and other 
works of authorship; 

(d) 

financial  and  business  information  such  as  the  Company’s  business  and 
strategic  plans,  earnings,  assets,  debts,  prices,  pricing  structure,  volume  of  purchases  or  sales, 
production, revenue and expense projections, historical financial statements, financial projections 
and budgets, historical and projected sales, capital spending budgets and plans, or other financial 
data  whether  related  to  the  Company’s  business  generally,  or  to  particular  products,  services, 
geographic areas, or time periods; 

(e) 

supply and service information such as goods and services suppliers’ names 
or addresses, terms of supply or service contracts of particular transactions, or related information 
about potential suppliers to the extent that such information is not generally known to the public, 
and to the extent that the combination of suppliers or use of a particular supplier, although generally 
known or available, yields advantages to the Company, the details of which are not generally known; 

(f) 

marketing information, such as details about ongoing or proposed marketing 
programs or agreements by or on behalf of the Company, sales forecasts or results of marketing 
efforts or information about impending transactions; 

14 

 
 
 
 
 
 
 
 
 
 
 
 
(g) 

personnel information relating to employees, contractors, or agents, such as 
personal histories, compensation or other terms of employment or engagement, actual or proposed 
promotions, hirings, resignations, disciplinary actions, terminations or reasons therefor, training 
methods, performance, or other employee information; 

(h) 

customer  information,  such  as  any  compilation  of  past,  existing  or 
prospective  customer’s names, addresses, backgrounds,  requirements,  records of purchases and 
prices, proposals or agreements between customers and the Company, status of customer accounts 
or credit, or related information about actual or prospective customers; 

(i) 

computer software of any type or form and in any stage of actual or anticipated 
development, including but not limited to, programs and program modules, routines and subroutines, 
procedures,  algorithms,  design  concepts,  design  specifications  (design  notes,  annotations, 
documentation, float charts, coding sheets, and the like), source codes, object code and load modules, 
programming, program patches and system designs; and 

(j) 

all information which becomes known to Employee as a result of Employee’s 
employment by the Company, which Employee acting reasonably, believes or ought to believe is 
confidential or proprietary information from its nature and from the circumstances surrounding its 
disclosure to Employee. 

5.3.  Non-Disclosure.  Employee, both during his or her employment and for a period of 
five (5) years after the termination of his or her employment irrespective of the time, manner or 
cause of termination, will: 

(a) 

retain in confidence all of the Confidential Information; 

(b) 

refrain from disclosing to any person including, but not limited to, customers 
and suppliers of the Company, any of the Confidential Information except for the purpose of carrying 
out Employee’s responsibilities with the Company, and 

(c) 

refrain from directly or indirectly using or attempting to use such Confidential 
Information in any way, except for the purpose of carrying out Employee’s responsibilities with the 
Company. 

Employee shall deliver promptly to the Company, at the termination of Employee’s employment, 
or at any other time at the Company’s request, without retaining any copies, all documents and other 
material in Employee’s possession relating, directly or indirectly, to any Confidential Information. 

It is understood that should Employee be subject to subpoena or other legal process to seek the 
disclosure of such Confidential Information, Employee will advise the Company of such process 

15 

 
 
 
 
 
 
 
 
 
 
 
 
and  provide  the  Company  with  the  necessary  information  to  seek  to  protect  the  Confidential 
Information. 

5.4.  Whistleblower Laws.  The  foregoing  obligations of  confidentiality set  out in  this 
Article 5 are subject to applicable whistleblower laws, which protect Employee’s right to provide 
information to governmental and regulatory authorities, including communications with the U.S. 
Securities and Exchange Commission about  possible  securities law violations.  Notwithstanding 
any other provision in this Agreement, Employee is not required to seek the Company’s permission 
or notify the Company of any communications made in compliance with applicable whistleblower 
laws, and the Company will not consider any such communications to violate this Agreement or 
any  other  agreement  between  Employer  and  the  Company  or  any  Company  policy  by  which 
Employee is bound. 

ARTICLE 6 
NON-SOLICITATION 

6.1.  Non-Solicitation.  Employee  agrees  that  during  the  period  (the  “Non-Solicitation 
Period”) commencing on the date of this Agreement and ending twelve (12) months after the effective 
date of the termination of Employee’s employment irrespective of the time, manner or cause of 
termination, Employee will not, either individually or in partnership or jointly or in conjunction 
with any other person, entity or organization, as principal, agent, consultant, contractor, employer, 
employee or in any other manner, directly or indirectly: 

(a) 

solicit  business  from  any  customer,  client  or  business  relation  of  the 
Company,  or  prospective  customer,  client  or  business  relation  that  the  Company  was  actively 
soliciting, whether or not Employee had direct contact with such customer, client or business relation, 
for the benefit or on behalf of any person, firm or corporation operating a business which competes 
with the Company, or attempt to direct any such customer, client or business relation away from 
the Company or to discontinue or alter any one or more of their relationships with the Company; 
or 

(b) 

hire or offer to hire or entice away or in any other manner persuade or attempt 
to persuade any officer, employee, consultant, independent contractor, agent, licensee, supplier, or 
business relation of the Company to discontinue or alter any one of their relationships with the 
Company. 

6.2.  Remedies  for  Breach  of  Restrictive  Covenants.  Employee  acknowledges  that  in 
connection with Employee’s employment he or she will receive or will become eligible to receive 
substantial benefits and compensation.  Employee acknowledges that Employee’s employment by 
the Company and all compensation and benefits from such employment will be conferred by the 
Company upon Employee only because and on the condition of Employee’s willingness to commit 
Employee’s  best  efforts  and  loyalty  to  the  Company,  including  protecting  the  Company’s 
confidential information and abiding by the non-solicitation covenants contained in this Agreement. 

16 

 
 
 
 
 
 
Employee understands that his obligations set out in Article 5 and this Article 6 will not unduly 
restrict or curtail Employee’s legitimate efforts to earn a livelihood following any termination of 
his or her employment with the Company. Employee agrees that the restrictions contained in Article 
5 and this Article 6 are reasonable and valid and all defenses to the strict enforcement of these 
restrictions  by  the  Company  are  waived  by  Employee.  Employee  further  acknowledges  that  a 
breach or threatened breach by Employee of any of the provisions contained in Article 5 or this 
Article 6 would cause the Company irreparable harm which could not be adequately compensated 
in damages alone.  Employee further acknowledges that it is essential to the effective enforcement 
of this Agreement that, in addition to any other remedies to which the Company may be entitled at 
law or in equity or otherwise, the Company will be entitled to seek and obtain, in a summary manner, 
from any Court having jurisdiction, interim, interlocutory, and permanent injunctive relief, specific 
performance and other equitable remedies, without bond or other security being required. In addition 
to any other remedies to which the Company may be entitled at law or in equity or otherwise, in 
the event of a breach of any of the covenants or other obligations contained in this Agreement, the 
Company will be entitled to an accounting and repayment of all profits, compensation, royalties, 
commissions, remuneration or benefits which Employee directly or indirectly, has realized or may 
realize relating to, arising out of, or in connection with any such breach. Should a court of competent 
jurisdiction declare any of the covenants set forth in Article 5 or this Article 6 unenforceable, the 
court shall be empowered to modify and reform such covenants so as to provide relief reasonably 
necessary to protect the interests of the Company and Employee and to award injunctive relief, or 
damages, or both, to which the Company may be entitled. 

ARTICLE 7 
GENERAL PROVISIONS 

7.1.  Governing Law.  This Agreement shall be governed by and construed in accordance 

with the laws of the state of Colorado. 

7.2.  Assignability. This Agreement is personal to Employee and without the prior written 
consent of the Company shall not be assignable by Employee other than by will or the laws of 
descent  and  distribution.  This Agreement  shall  inure  to  the  benefit  of  and  be  enforceable  by 
Employee’s legal representatives and heirs.  This Agreement shall also inure to the benefit of and 
be binding upon the Company and its successors and assigns. 

7.3.  Withholding.  The Company may withhold from any amounts payable under this 
Agreement such federal, state or local taxes as shall be required to be withheld pursuant to any 
applicable law or regulation. 

7.4. 

Entire Agreement; Amendment. This Agreement constitutes the  entire agreement 
and understanding between Employee and the Company with respect to the subject matter hereof 
and,  except  as  otherwise  expressly  provided  herein,  supersedes  any  prior  agreements  or 

17 

 
 
 
 
 
 
understandings, whether written or oral, with respect to the subject matter hereof, including without 
limitation  all  employment,  severance  or  change  of  control  agreements  previously  entered  into 
between Employee and the Company or Uranerz Energy Corporation.  Except as may be otherwise 
provided herein, this Agreement may not be amended or modified except by subsequent written 
agreement executed by both parties hereto. 

7.5. 

Section 409A. This Agreement is intended to comply with Section 409Ato the extent 
Section 409A  is  applicable  to  this  Agreement.  Notwithstanding  any  other  provision  of  this 
Agreement to the contrary, this Agreement shall be interpreted, operated and administered by the 
Company in a manner consistent with such intention and to avoid the pre-distribution inclusion in 
income of amounts deferred under this Agreement and the imposition of any additional tax or interest 
with respect thereto.  Notwithstanding any other provision of this Agreement to the contrary, to the 
extent that any payment under this Agreement constitutes “nonqualified deferred compensation” 
under Section 409A, the following shall apply to the extent Section 409A is applicable to such 
payment: 

(a) 

Any  payable  that  is  triggered  upon  the  Employee’s  termination  of 
employment shall be paid only if such termination of employment constitutes a “separation from 
service” under Section 409A; and 

(b) 

All expenses or other reimbursements paid pursuant to this Agreement that 
are taxable income to Employee shall be paid no later than the end of the calendar year next following 
the calendar year in which Employee incurs such expense.  With regard to any provision herein that 
provides for reimbursement of costs and expenses or in-kind benefits, except as permitted by Section 
409A,  (a)  the  right  to  reimbursement  or  in-kind  benefits  shall  not  be  subject  to  liquidation  or 
exchange for another benefit, (b) the amount of expenses eligible for reimbursement, or in-kind 
benefits, provided during any taxable year shall not affect the expenses eligible for reimbursement, 
or in-kind benefits to be provided, in any other taxable year; and (c) such payments shall be made 
on or before the last day of Employee’s taxable year following the taxable year in which the expense 
occurred.  For purposes of Section 409A, Employee’s right to receive installment payments of any 
severance amount, if applicable, shall be treated as a right to receive a series of separate and distinct 
payments. 

In the event that Employee is deemed on the date of termination to be a “specified employee” as 
defined in Section 409A, then with regard to any payment or the provision of any benefit that is 
subject to Section 409A and is payable on account of a separation from service (as defined in 
Section 409A), such payment or benefit shall be delayed for until the earlier of (a) the first 
business day of the seventh calendar month following such termination of employment, or (b) 
Employee’s death.  Any payments delayed by reason of the prior sentence shall be paid in a  
single lump sum, without interest thereon, on the date indicated by the previous sentence and any 
remaining payments due under this Agreement shall be paid as otherwise provided herein. 

18 

 
 
 
 
 
7.6.  Multiple Counterparts.  This Agreement may be executed in multiple counterparts, 

each of which shall constitute an original, but all of which together shall constitute one Agreement. 

7.7.  Notices. Any notice provided for in this Agreement shall be deemed delivered upon 
deposit in the  United States  mails, registered or certified mail, addressed to the  party to whom 
directed at the addresses set forth below or at such other addresses as may be substituted therefor 
by notice given hereunder.  Notice given by any other means must be in writing and shall be deemed 
delivered only upon actual receipt. 

If to the Company: 

c/o Energy Fuels Resources (USA) Inc. 
225 Union Blvd., Suite 600 
Lakewood, CO 80228 

Attention:  President and Chief Executive Officer 

If to Employee: 

William Paul Goranson 
5926 S. Jellison St., Apt. E 
Littleton, CO 80123 

7.8.  Waiver. The waiver of any term or condition of this Agreement, or any breach thereof, 
shall not be deemed to constitute the waiver of the same or any other term or condition of this 
Agreement, or any breach thereof. 

7.9. 

Severability.  In  the  event  any  provision  of  this  Agreement  is  found  to  be 
unenforceable or invalid, such provision shall be severable from this Agreement and shall not affect 
the enforceability or  validity of  any other provision of this Agreement.  If any provision of this 
Agreement is capable of two constructions, one of which would render the provision void and the 
other  that  would  render  the  provision  valid,  then  the  provision  shall  have  the  construction  that 
renders it valid.. 

7.10.  Arbitration  of  Disputes.  Except  for  disputes  and  controversies  arising  under 
Articles 5 or 6 or involving equitable or injunctive relief, any dispute or controversy arising under 
or in connection with this Agreement shall be conducted in accordance with the Colorado Rules of 
Civil Procedure and, unless the parties mutually agree on an arbitrator shall be arbitrated by striking 
from a list of potential arbitrators provided by the Judicial Arbiter Group in Denver, Colorado.  If 
the parties are unable to agree on an arbitrator, the arbitrator will be selected from a list of seven 
(7) potential  arbitrators provided by the  Judicial Arbiter Group in Denver.   The Company  and 
Employee will flip a coin to determine who will make the first strike. The parties will then alternate 

19 

 
 
 
 
 
 
 
 
striking from the list until there is one arbitrator remaining, who will be the selected arbitrator. 
Unless the parties otherwise agree and subject to the availability of the arbitrator, the arbitration 
will be heard within sixty (60) days following the appointment, and the decision of the arbitrator 
shall be binding on Employee and the Company and will not be subject to appeal.  Judgment may 
be entered on the arbitrator’s award in any court having jurisdiction. 

7.11.  Currency.  Except  as  expressly  provided  in  this Agreement,  all  amounts  in  this 

Agreement are stated and shall be paid in United States dollars ($US). 

7.12.  Company’s  Maximum  Obligations.  The  compensation  set  out  in  this Agreement 
represents the Company’s maximum obligations, and other than as set out herein, Employee will 
not  be  entitled  to  any  other  compensation,  rights  or  benefits  in  connection  with  Employee’s 
employment or the termination of Employee’s employment. 

7.13.  Full Payment;  No Mitigation Obligation.  The Company’s obligation to make the 
payments provided for in this Agreement and otherwise to perform its obligations hereunder shall 
be subject to any set-off, counterclaim, recoupment, defense or other claim, right or action which 
the Company may have against Employee. 

20 

 
 
 
 
IN WITNESS WHEREOF, the parties have executed this Agreement as of the Effective 

Date. 

ENERGY FUELS INC. 

By:      /s/ Mark S. Chalmers 

Name:  Mark S. Chalmers 
Title:  President and Chief Executive Officer 
Date:  February 14, 2018 

ENERGY FUELS RESOURCES (USA) INC. 

By:      /s/ Mark S. Chalmers 

Name:  Mark S. Chalmers 
Title:  President and Chief Executive Officer 
Date:  February 14, 2018 

By:      /s/ William Paul Goranson 

Name:  William Paul Goranson 
Title:  Chief  Operating  Officer 
Date:   February 14, 2018 

21 

 
 
 
 
 
 
 
 
 
EXHIBIT A 
JOB DESCRIPTION 

Working with the President and Chief Executive Officer, Employee shall be responsible for all 
aspects of the Company’s operations.  The Chief Operating Officer focuses on the establishment 
and optimization of the day-to-day operations of the Company.  Responsibilities include setting 
monthly production goals following input from sales and financial departments, and developing 
and monitoring production budgets. 

Working with and in accordance with directions from the President and Chief Executive Officer, 
the Chief Operating Officer’s essential duties and responsibilities include: 

•  overseeing all of the Company’s operations 
•  maintaining a culture of safety as a top priority 
•  ensuring that environmental stewardship is a key component of the Company’s operating 

philosophy 

•  ensuring all direct reports are informed of operational objectives and goals 
•  monitoring production and operations costs against approved budgets 
•  being responsible for overall costs of production to ensure that they are within Board- 

approved budgets 

•  ensuring production is sufficient to meet current and long-term contracts and published 

guidance 

•  ensuring the Company’s operations are in full compliance with all permits and 

• 

regulations 
setting operational and performance goals for each area that are aggressive, achievable 
and tied to the Company’s long term business plan 

•  coordinating activities with legal and finance departments by maintaining open and 

regular communication 

•  directing the Company’s Technical Services function 
•  ensuring employees are motivated, rewarded appropriately, and have potential for 

advancement 
taking charge in high priority crises relating to operations 

• 
•  establishing a culture of best practices for all Company operations 

Notwithstanding the foregoing, the President and Chief Executive Officer may from time to time 
or at any time retain or place any of the foregoing functions under his authority or under the 
authority of one or more of his other direct reports, provided that no such other direct report shall 
be responsible for the overall operations of the Company, and any such action on the part of the 
President and Chief Executive Officer shall not constitute a material reduction or diminution in 
the level of responsibility, or office of Employee. 

Employee shall report to the President and Chief Executive Officer of the Company. 

This position will be located in the Lakewood office with frequent travel as required. 

22 

 
 
 
 
Performance is to be based on Board-approved Performance Goals in accordance with the 
Company’s STIP and LTIP, which will be evaluated once per year. 

23 

 
 
EMPLOYMENT AGREEMENT 

THIS  EMPLOYMENT AGREEMENT  (“Agreement”)  is  effective  as  of  the  1st  day  of 
February,  2018  (the  “Effective  Date”),  by  and  between  Energy  Fuels  Resources  (USA)  Inc.,  a 
Delaware corporation (“EFRI”), Energy Fuels Inc., an Ontario corporation (“EFI”) (EFRI and EFI 
are collectively referred to herein as the “Company”) and Mark S. Chalmers (“Employee”). 

In consideration of the agreements contained in this Agreement, and other good and valuable 
consideration, the receipt and sufficiency of which are hereby acknowledged, the Company and 
Employee hereby agree as follows: 

ARTICLE 1 
EMPLOYMENT, REPORTING AND DUTIES 

1.1. 

Employment.  The Company hereby employs and engages the services of Employee 
to serve as President and Chief Executive Officer and Employee agrees to diligently and competently 
serve as and perform the functions of President and Chief Executive Officer for the compensation 
and benefits stated herein. Acopy of Employee’s current job description is attached hereto as Exhibit 
A, and Company and Employee agree and acknowledge that, subject to Section 4.2(b), Company 
retains the right to reasonably add to, or remove, duties and responsibilities set forth in that job 
description as business or other operating reasons may arise for changes to occur.  It is understood 
that Employee will be appointed an officer of EFI and EFRI during the term of this Agreement, but 
that Employee’s direct employment relationship will be as an employee of EFRI. 

1.2. 

Fulltime  Service.  Excluding  any  periods  of  vacation  and  sick  leave  to  which 
Employee may be entitled, Employee agrees to devote Employee’s full time and energies to the 
responsibilities with the Company consistent with past practice and shall not, during the Term of 
this Agreement, be engaged in any business activity which would interfere with or prevent Employee 
from carrying out Employee’s duties under this Agreement. 

ARTICLE 2 
COMPENSATION AND RELATED ITEMS 

2.1.  Compensation. 

As  compensation  and  consideration  for  the  services  to  be  rendered  by  Employee  under  this 
Agreement, the Company agrees to pay Employee and Employee agrees to accept: 

(a) 

Base Salary and Benefits.  A base salary (“Base Salary”) of $350,000 per 
annum,  less  required  tax  withholding,  which  shall  be  paid  in  accordance  with  the  Company’s 
standard payroll practice.  Employee’s Base Salary may be increased from time to time (but not 
decreased, including after any increase, without Employee’s written consent), at the discretion of 
1 

 
 
 
 
 
 
 
 
 
 
 
the Company, and after any such change, Employee’s new level of Base Salary shall be Employee’s 
Base  Salary  for  purposes  of  this Agreement  until  the  effective  date  of  any  subsequent  change. 
Employee shall also receive benefits such as health insurance, vacation and other benefits consistent 
with  the  then  applicable  Company  benefit  plans  to  the  same  extent  as  other  employees  of  the 
Company with similar position or level.  Employee understands and agrees that, subject to Sections 
2.1(b) and (c) below, Company’s benefit plans may, from time to time, be modified or eliminated 
at Company’s discretion. 

(b) 

Cash  Bonus.  A cash  bonus  opportunity  (the  “Cash  Bonus”)  during  each 
calendar year with a target (the “Target Cash Bonus”) equal to fifty percent (50%) (the “Target 
Cash Bonus Percentage”) of Employees’ Base Salary for the year in which the cash bonus is paid, 
such cash bonus to be paid in accordance with the Company’s existing Short Term Incentive Plan, 
as such plan may be amended or replaced from time to time, or the equivalent (the “STIP”). Pursuant 
to the terms of the STIP, each annual Cash Bonus shall be payable based on the achievement of 
performance goals, and may be higher or lower than the Target Cash Bonus based on achievement 
of  those  goals. For  each  calendar  year  during  the  term  of  this Agreement,  the  Board  (or  the 
Compensation Committee) of EFI will determine and will establish in writing (i) the applicable 
STIP performance  goals,  which  shall  be  reasonably  achievable  and  if  achieved  would  result  in 
payment of the Target Cash Bonus,  (iii) the  percentage of annual Base Salary to be payable to 
Employee if some lesser or greater percentage of the annual STIP performance goals are achieved, 
and (iv) such other applicable terms and conditions of the STIP necessary to satisfy the requirements 
of Section 409A of the Internal Revenue Code of 1986, as amended (the "Code"); and 

(c) 

Equity Award.  An equity award opportunity (the “Equity Award”) during 
each calendar year with a target value (the “Target Equity Award”) equal to one hundred percent 
(100%) (the “Target Equity Award Percentage”) of Employee’s Base Salary for the year in which 
the award is granted, such equity award to be awarded in accordance with the Company’s existing 
Long Term Incentive Plan, as such plan may be amended or replaced from time to time, or the 
equivalent (the “LTIP”).  Pursuant to the terms of the LTIP, each annual equity award shall be made 
based on the achievement of performance goals, and may be higher or lower than the Target Equity 
Award  based  on  achievement  of  those  goals. For  each  calendar  year  during  the  term  of  this 
Agreement, the Board (or the Compensation Committee) of EFI will determine and will establish 
in writing (i) the applicable LTIP performance goals, which shall be reasonably achievable and if 
achieved would result in payment of the Target Equity Award, (iii) the percentage of annual Base 
Salary value to be awarded in equity to Employee if some lesser or greater percentage of the annual 
LTIP performance goals are achieved, and (iv) such other applicable terms and conditions of the 
LTIP necessary to satisfy the requirements of Section 409A of the Code. 

2.2.  Annual Medical. Employee shall have a comprehensive annual medical examination 
each calendar year of this Agreement.  The Company will reimburse Employee for the cost of each 
such examination, provided that Employee requests such reimbursement and such reimbursement 
is made no later than the last day of the calendar year following the calendar year in which the 
2 

 
 
 
 
examination expense was incurred.  Employee will promptly notify the Chairman of the Board of 
EFI (the “Chairman of the Board”) if the annual medical examination reveals any condition which, 
if untreated, is likely to interfere with Employee’s ability to perform the essential requirements of 
Employee’s position, and if requested by the Chairman of the Board, Employee will provide the 
details  of  the  condition  and  the  potential  impact  on  his  or  her  ability  to  perform  the  essential 
requirements of his or her position to enable the Chairman of the Board to determine how best to 
accommodate Employee and protect the critical business interests of the Company. 

2.3. 

Expenses.  The  Company  agrees  that  Employee  shall  be  allowed  reasonable  and 
necessary business expenses in connection with the performance of Employee’s duties within the 
guidelines  established  by  the  Company  as  in  effect  at  any  time  with  respect  to  key  employees 
(“Business Expenses”), including, but not limited to, reasonable and necessary expenses for food, 
travel,  lodging,  entertainment  and  other  items  in  the  promotion  of  the  Company  within  such 
guidelines. The Company shall promptly reimburse Employee for all reasonable Business Expenses 
incurred by Employee upon Employee’s presentation to the Company of an itemized account thereof, 
together with receipts, vouchers, or other supporting documentation. 

2.4.  Vacation.  Employee will be entitled to five weeks of vacation each year, in addition 
to the 10 paid holidays each year.  Carry over from one year to the next will be as per the Company’s 
paid leave policy. 

2.5.  Work  Away  From  Office.  The  Company  recognizes  that  Employee  may  be 
completing his regular work away from the office each year during a period or periods of time 
aggregating up to two weeks per calendar year or as agreed to in writing by the Chairman of the 
Board.  These periods of time will count as work time and will not count as vacation time or paid 
or unpaid leave.  However, any travel and lodging for these periods of time will not be charged by 
Employee as a business expense unless pre-approved by the Chairman of the Board.  The aggregate 
period of time explained here will be per calendar year, unless otherwise approved by the Board of 
Directors of EFI. 

2.6.  Vehicle. The Company will provide Employee the use of a vehicle for his unrestricted 
personal and work use, and will pay all reasonable maintenance and operating costs, while Employee 
is employed as President and Chief Executive Officer of the Company under this Agreement.  The 
vehicle will be approved by the Chairman of the Board, will be new as of the Effective Date and 
will be suitable for both  highway travel and off-road travel to access Company properties.  The 
vehicle will be owned or leased by the Company, but Employee will have the option to acquire it 
in the circumstances set out in Section 3.3(b)(iv) below. 

2.7.  Outside  Directorship.  Employee  shall  be  entitled  to  seek  and  maintain  one  non- 
executive, non-chair directorship with a publicly traded or privately owned company that does not 
compete directly or indirectly with the Company in any of the Company’s primary business lines. 
Employee shall not seek or maintain more than one such directorship or vary from any of the 
3 

 
 
 
 
 
 
foregoing requirements without the prior written approval of the Board of Directors of EFI.  Such 
directorships exclude directorships on private family holding companies or on any company where 
Employee is requested by the Company to seek or maintain such a directorship. 

ARTICLE 3 
TERMINATION 

3.1. 

Term.  Employee’s  employment  under  this  Agreement  shall  commence  on  the 
Effective Date and will end on the date (the “Initial Expiration Date”) that is the second anniversary 
of the Effective Date, unless terminated sooner under the provisions of this Article, or extended 
under the terms of this Section.  If neither Company nor Employee provides written notice of intent 
not to renew this Agreement by ninety (90) days prior to the Initial Expiration Date, this Agreement 
shall  be  automatically  renewed  for  twelve  (12)  additional months,  and  if neither  Company  nor 
Employee provides written notice of intent not to renew this Agreement prior to ninety (90) days 
before the end of such additional 12-month period, this Agreement shall continue to be automatically 
renewed for successive additional 12-month periods until such time either Company or Employee 
provides written notice of intent not to renew prior to ninety (90) days before the end of any such 
renewal period. 

3.2. 

Termination  of  Employment.  Except  as  may  otherwise  be  provided  herein, 

Employee’s employment under this Agreement may terminate upon the occurrence of: 

(a) 

Notice by Company. The termination date specified in a written notice of 

termination that is given by the Company to Employee; 

(b) 

Notice by Employee.  Thirty (30) days after written notice of termination is 

given by Employee to the Company; 

(c) 
Employee’s becoming disabled; 

Death or  Disability.  Employee’s  death  or,  at the  Company’s  option, upon 

(d) 

Deemed  Termination  Without  Just  Cause  upon  a  Change  of  Control.  A 
deemed termination without just cause under Section 4.1(a) upon the occurrence of a Change of 
Control; or 

(e) 

Notice Not to Renew.  If the Company or Employee gives the other a notice 
not to renew this Agreement under Section 3.1, employment under this Agreement shall terminate 
at the close of business at the end of the Initial Expiration Date or at the end of the 12-month renewal 
period in which timely notice not to renew was given, as the case may be. A notice by the Company 
not to renew shall be considered a notice of termination, resulting in the Company terminating 
Employee’s employment under this Agreement. 

4 

 
 
 
 
 
 
 
 
 
Any notice of termination given by the Company to Employee under Section 3.2(a) or (e) above 
shall specify whether such termination is with or without just cause as defined in Section 3.4.  Any 
notice of termination given by Employee to the Company under Section 3.2(b) above shall specify 
whether such termination is made with or without Good Reason as defined in Section 4.2(b). 

3.3.  Obligations of the Company Upon Termination. 

(a)  With  Just  Cause/Without  Good  Reason.  If  the  Company  terminates 
Employee’s  employment  under  this Agreement  with  just  cause  as  defined  in  Section  3.4,  or  if 
Employee terminates his employment without Good Reason as defined in Section 4.2(b) (other than 
a voluntary retirement under Section 3.8(a)), in either case whether before or after a Change of 
Control as defined in Section 4.2(a), then Employee’s employment with the Company shall terminate 
without  further  obligation  by  the  Company  to  Employee,  other  than  payment  of  all  accrued 
obligations (“Accrued Obligations”), including outstanding Base Salary, accrued vacation pay and 
any other cash benefits accrued up to and including the date of termination.  That payment shall be 
made in one lump sum, less required tax withholding, within ten (10) working days after the effective 
date of such termination. Employee will have up to the earlier of: (A) ninety (90) days from the 
effective date of termination of Employee’s employment; or (B) the date on which the exercise 
period  of  the  particular  stock  option  expires,  to  exercise  only  that  portion  of  the  stock  options 
previously granted to Employee that have not been exercised, but which have vested, and thereafter 
Employee’s stock options will expire and Employee will have no further right to exercise the stock 
options.  Any  stock  options  held  by  Employee  that  are  not  yet  vested  at  the  termination  date 
immediately expire and are cancelled and forfeited to the Company on the termination date.  Any 
Restricted Stock Units (“RSUs”) held by Employee that have vested on or before the termination 
date  shall  be  paid  (or  the  shares  issuable  thereunder  issued)  to  Employee.  Any  RSUs  held  by 
Employee that are not vested on or before the termination date will be immediately cancelled and 
forfeited to the Company on the termination date.  The rights of Employee upon termination in 
respect of any other awards granted to Employee under any of the Company’s equity compensation 
plans shall be as set forth in such plans or in the award agreement for any such awards, as applicable. 
Notwithstanding the foregoing, but subject to Section 3.8(a), on retirement, Employee will have up 
to the earlier of: (A) one hundred and eighty (180) days from the effective date of retirement; or 
(B) the date on which the exercise period of the particular stock option expires, to exercise only 
that portion of the stock options previously granted to Employee that have not been exercised, but 
which have vested, and thereafter Employee’s stock options will expire and Employee will have 
no further right to exercise the stock options. 

(b)  With  Good  Reason/Without  Just  Cause/Disabled/Death.  If  Employee 
terminates Employee’s employment under this Agreement for Good Reason as defined in Section 
4.2(b), or  if  the  Company  terminates  Employee’s  employment without  just  cause as  defined  in 
Section  3.4,  or  if  the  Company  terminates  Employee’s  employment  by  reason  of  Employee 
becoming  Disabled  as  defined  in  Section  3.5,  or  if  Employee  dies  (in  which  case  the  date  of 

5 

 
 
 
 
 
Employee’s death shall be considered his or her termination date), in any case whether before or 
after a Change of Control as defined in Section 4.2(a), or if there is a deemed termination without 
just  cause  upon  a  Change  of  Control  as  contemplated  by  Section  4.1(a),  then  Employee’s 
employment with the Company shall terminate, as of the effective date of the termination, and in 
lieu of any other severance benefit that would otherwise be payable to Employee: 

(i) 

the Company shall pay the following amounts to Employee (or, in 
the case of termination by reason of Employee becoming Disabled or upon the death 
of Employee, to Employee’s legal representative or estate as applicable) after the 
effective date of such termination, or in a manner and at such later time as specified 
by Employee (or Employee’s legal representative), and agreed to by the Company, 
subject to being in compliance with Section 409A of the Code: 

(A) 

all Accrued Obligations, less required tax withholding, up to 
and including the date of termination, to be paid on the date of termination 
of employment, or within no more than five (5) working days thereafter, and 
the Company will reimburse Employee for all proper expenses incurred by 
Employee in discharging his responsibilities to the  Company prior to the 
effective date of termination of Employee’s employment in accordance with 
Section 2.3 above; and 

(B) 

an  amount  in  cash  equal  to  two  and  one  half  (2.5)  (the 
“Severance Factor”) times the sum of Employee’s Base Salary, Target Cash 
Bonus  and  Target  Equity  Award  for  the  full  year  in  which  the  Date  of 
Termination occurs, less required tax withholding, such amount to be paid 
within thirty (30) calendar days after the date Employee signs the Release 
contemplated by Section 3.7; 

(ii) 

Employee  or  Employee’s  legal  representative  will  have  up  to  the 
earlier of: (A) ninety (90) days from the effective date of termination of Employee’s 
employment for all cases other than the death of Employee and twelve (12) months 
from the effective date of termination of Employee’s employment in the  case of 
death of Employee; or (B) the date on which the exercise period of the particular 
stock option expires, to exercise only that portion of the stock options previously 
granted  to  Employee  that  have  not  been  exercised,  but  which  have  vested,  and 
thereafter Employee’s stock options will expire and Employee or his or her legal 
representative will have no further right to exercise the stock options.  Subject to 
Section 4.1(c), any stock options held by Employee that are not yet vested at the 
termination date immediately expire and are cancelled and forfeited to the Company 

6 

 
 
 
 
 
 
 
on the termination date.  Any RSUs held by Employee that have vested on or before 
the  termination  date  shall  be  paid  (or  the  shares  issuable  thereunder  issued)  to 
Employee or his or her legal representative or estate as applicable. Subject to Section 
4.1(c), any RSUs held by Employee that are not vested on or before the termination 
date will be immediately cancelled and forfeited to the Company on the termination 
date.  Subject  to  Section  4.1(c),  the  rights  of  Employee  or  his  or  her  legal 
representative or estate as applicable upon termination in respect of any other awards 
granted to Employee under any of the Company’s equity compensation plans shall 
be as  set forth  in such  plans  or in  the  award  agreement for  any  such awards,  as 
applicable; 

(iii)  Upon  termination,  the  Company  or  its  Successor  (as  defined  in 
Section  4.1(a)),  agrees  to  reimburse  Employee  the  full  cost  of  the  COBRA 
continuation rate charged for employee and dependent coverage, through the EFRI 
Health and Welfare Plan on a monthly basis, for a period of months equal to twelve 
times  the  Severance  Factor  (the  “Coverage  Period”),  beyond  Employee’s 
termination  month.  Employee  and  his  or  her  dependents  may,  at  their  choosing, 
enroll in the COBRA continuation plan through EFRI for the first eighteen months 
following Employee’s termination month or, if they choose, they may enroll in a 
separate plan of their choosing, by using the reimbursement to enroll in medical and 
prescription insurance of their choosing. Reimbursement at the rate described herein 
will continue for the Coverage Period beyond Employee’s termination month, but 
beginning with the nineteenth month, Employee and his or her dependents will need 
to obtain coverage from a different source than the COBRAcontinuation plan through 
EFRI.  The reimbursement will be to Employee and his or her dependents directly, 
and will be grossed up so that there is no negative tax impact to the Employee or his 
or dependents for coverage of the premiums charged by the insurance carriers for 
the COBRA continuation coverage for the current month of  reimbursement. The 
reimbursed cost of COBRA coverage will be indexed annually, and will match the 
rate charged for any month of coverage available by the insurance carrier for Medical, 
Dental, and Optical coverage through EFRI for employee and spouse coverage. Both 
Employee and his or her dependents, will have the option of purchasing a medical 
plan separate from the plan offered by EFRI; and 

(iv)  At the sole option of Employee, Employee may purchase the vehicle 
contemplated  by  Section  2.5  above  at  then  fair  market  value,  as  reasonably 
determined by the Company.  If the Company owns the vehicle, the Company will 
transfer ownership of  the vehicle to Employee at such value, or if the vehicle is 
leased by the Company, the Company will exercise the option to buy-out the lease 
and will transfer ownership of the vehicle to Employee at such value.  In any case, 

7 

 
 
 
 
 
Employee will be responsible for any taxable benefit associated with the transfer of 
ownership of the vehicle to Employee, which the Company may deduct from the 
amounts payable to Employee under this Section 3.3(b). 

(v) 

Nothing herein shall preclude the Company from granting additional 

severance benefits to Employee upon termination of employment. 

Notwithstanding the foregoing, in the  case of Disability, any  Base Salary  payable to Employee 
during the one hundred and eighty (180) day period of disability will be reduced by the amount of 
any  disability  benefits  Employee  receives  or  is  entitled  to  receive  as  a  result  of  any  disability 
insurance policies for which the Company has paid the premiums. 

(c) 

Section 280G.  Notwithstanding any other provisions of this Agreement, or 
any other plan, arrangement or agreement to the contrary, if any of the payments or benefits provided 
or to be provided by the Company or its affiliates to Employee or for Employee’s benefit pursuant 
to the terms of this Agreement or otherwise (“Covered Payments”) constitute “parachute payments” 
within the meaning of Section 280G of the Code and would, but for this Section 3.3(c) be subject 
to the excise tax imposed under Section 4999 of the Code (or any successor provision thereto) or 
any similar tax imposed by state or local law or any interest or penalties with respect to such taxes 
(collectively, the “Excise Tax”), then the following shall apply: 

(i) 

If the Covered Payments, reduced by the sum of (1) the Excise Tax 
and (2) the total of the Federal, state, and local income and employment taxes payable 
by Employee on the amount of the Covered Payments which are in excess of three 
times Employee’s “base amount” within the meaning of Section 280(G) of the Code 
less one dollar (the “Threshold Amount”), are greater than or equal to the Threshold 
Amount, Employee shall be entitled to the full benefits payable under this Agreement; 
and 

(ii) 

If the Threshold Amount is less than (1) the Covered Payments, but 
greater than (2) the Covered Payments reduced by the sum of (x) the Excise Tax and 
(y) the total of the Federal, state, and local income and employment taxes on the 
amount of the Covered Payments which are in excess of the Threshold Amount, then 
the Covered Payments shall be reduced (but not below zero) to the extent necessary 
so that the sum of all Covered Payments shall not exceed the Threshold Amount.  In 
such event, the Covered Payments shall be reduced in the following order:  (A) cash 
payments not subject to Section 409A; (B) cash payments subject to Section 409A; 
(C) equity-based payments and acceleration; and (D) non-cash forms of benefits. 
To the extent any payment is to be made over time (e.g., in installments, etc.), then 
the payments shall be reduced in reverse chronological order. 

8 

 
 
 
 
 
 
The  determination  as  to  which  of  the  alternative  provisions  of  Section  3.3(c)(ii)  shall  apply  to 
Employee shall be made by a nationally recognized accounting firm selected by the Company (the 
“Accounting Firm”), which shall provide detailed supporting calculations both to the Company 
and Employee within 15 business days of the date of termination, if applicable, or at such earlier 
time as is reasonably requested by the Company or  Employee.  For purposes of determining which 
of the alternative provisions of Section 3.3(c)(ii) shall apply, Employee shall be deemed to pay 
Federal income taxes at the highest marginal rate of Federal income taxation applicable to individuals 
for the calendar year in which the determination is to be made, and state and local income taxes at 
the highest marginal rates of individual taxation in the state and locality of Employee’s residence 
on the date of termination, net of the maximum reduction in Federal income taxes which could be 
obtained from deduction of such state and local taxes.  Any determination by the Accounting Firm 
shall be binding upon the Company and Employee. 

3.4.  Definition of Just Cause. 

As used in this Agreement, the term “just cause” will mean any one or more of the following events: 

(a) 

theft,  fraud,  dishonesty,  or  misappropriation  by  Employee  involving  the 
property, business or affairs of the Company or the discharge of Employee’s responsibilities or the 
exercise of his or her authority; 

(b) 

willful misconduct or the willful failure by Employee to properly discharge 

his or her responsibilities or to adhere to the policies of the Company 

(c) 

Employee’s gross negligence in the discharge of his or her responsibilities 
or  involving  the  property,  business  or  affairs  of  the  Company  to  the  material  detriment  of  the 
Company; 

(d) 

Employee’s conviction of a criminal or other statutory offence that constitutes 
a felony or which has a potential sentence of imprisonment greater than six (6) months or Employee’s 
conviction of a criminal or other statutory offence involving, in the sole discretion of the Board of 
Directors of EFI, moral turpitude; 

(e) 

(f) 

or 6 below; 

Employee’s material breach of a fiduciary duty owed to the Company; 

any material breach by Employee of the covenants contained in Articles 5 

(g) 

Employee’s unreasonable refusal to follow the lawful written direction of 

the Board of Directors of EFI on any material matter; 

(h) 

any conduct of Employee which, in the reasonable opinion of the Board of 

Directors of EFI, is materially detrimental or embarrassing to the Company; or 

9 

 
 
 
 
 
 
 
 
 
 
 
 
(i) 

any other conduct by Employee that would constitute “just cause” as that 

term is defined at law. 

The Company must provide written notice to Employee prior to termination for just cause pursuant 
to Section 3.4 (c), (f), (g), (h), or (i) and provide Employee the opportunity to correct and cure the 
failure within thirty (30) days from the receipt of such notice. If the parties disagree as to whether 
the Company had just cause to terminate the Employee’s employment, the dispute will be submitted 
to binding arbitration pursuant to Section 7.9 below. 

3.5.  Definition of Disabled.  As used herein, “Disabled” shall mean a mental or physical 
impairment which, in the reasonable opinion of a qualified doctor selected by mutual agreement of 
the  Company  and  Employee  acting  reasonably,  renders  Employee  unable,  with  reasonable 
accommodation, to perform with reasonable diligence the essential functions and duties of Employee 
on a full-time basis in accordance with the terms of this Agreement, which inability continues for 
a period of not less than 180 consecutive days.  The providing of service to the Company for up to 
two (2) three (3) day periods during the one hundred and eighty (180) day period of disability will 
not affect the determination as to whether Employee is Disabled and will not restart the one hundred 
and eighty (180) day period of disability. If any dispute arises between the parties as to whether 
Employee is Disabled, Employee will  submit to an examination by a physician selected by the 
mutual agreement of the Company and Employee acting reasonably, at the Company’s expense. 
The decision of the physician will be certified in writing to the Company, and will be sent by the 
Physician to Employee or Employee’s legally authorized representative, and will be conclusive for 
the purposes of determining whether Employee is Disabled. If Employee fails to submit to a medical 
examination within twenty (20) days after the Company’s request, Employee will be deemed to 
have voluntarily terminated his or her employment. 

3.6.  Return  of  Materials;  Confidential  Information.  In  connection  with  Employee’s 
separation from employment for any reason, Employee shall return any and all physical property 
belonging to the Company, and all material of whatever type containing “Confidential Information” 
as defined in Section 5.2 below, including, but not limited to, any and all documents, whether in 
paper  or  electronic  form,  which  contain  Confidential  Information,  any  customer  information, 
production information, manufacturing-related information, pricing information, files, memoranda, 
reports, pass codes/access cards, training or other reference manuals, Company vehicle (subject to 
Section 3.3(b)(iv)), telephone, gas cards or other Company credit cards, keys, computers, laptops, 
including any computer disks, software, facsimile machines, memory devices, printers, telephones, 
pagers or the like. 

3.7.  Delivery of Release.  Within ten (10) working days after termination of Employee’s 
employment, and as a condition for receipt of payments set forth in Section 3.3(b)(i)(B), 3.3(b)(iii), 
3.3(b)(iv),  3.8(a)  and  4.1(a),  the  Company  shall  provide  to  Employee,  or  Employee’s  legal 
representative, a form of written release, which form shall be satisfactory to the Company and 

10 

 
 
 
 
 
 
generally consistent with the form of release used by the Company prior to such termination of 
employment (the “Release”) and which shall provide a full release of all claims against the Company 
and its corporate affiliates, except where Employee has been named as a defendant in a legal action 
arising out of the performance of Employee’s responsibilities in which case the Release will exempt 
any claims which Employee or his or her legal representative or estate may have for indemnity by 
the Company with respect to any such legal action. As a condition to the obligation of the Company 
to make the payments provided for in such Sections Employee, or Employee’s legal representative, 
shall execute and deliver the Release to the Company within the time periods provided for in said 
release. 

3.8.  Retirement. 

(a) 

If Employee voluntarily retires from the Company at any time after the fifth 

anniversary of the Effective Date of this Agreement: 

(i) 

The  provisions  of  Section 3.3(b)(i)A.  will  apply,  and  provided 
Employee has given the Company at least 6 months written notice of his retirement, 
the provisions of Sections 3.3(b)(iii) and 3.3(b)(iv) above will also apply, and the 
Company will pay the Employee the amounts and will take the actions specified in 
those Sections on the basis that the Employee’s retirement date shall be considered 
to be his termination date for purposes of those sections; and 

(ii) 

provided Employee has given the Company at least 6 months written 
notice of his retirement, all of the stock options previously granted to the Employee 
that have neither vested nor expired will automatically vest and become immediately 
exercisable, and will continue to be exercisable for a period of six months after the 
Employee’s  date  of  retirement,  any  period  of  restriction  and  other  restrictions 
imposed on all RSUs shall lapse, all RSUs shall be immediately settled and payable 
(or the shares issuable thereunder issued), and all other securities awarded under the 
EFI Omnibus Equity Incentive Plan or any other equity incentive plan shall vest and/ 
or accelerate effective as of the date of retirement. 

(b) 

The parties acknowledge that additional retirement and successor provisions 
may be addressed in the future if and when appropriate, and corresponding amendments may be 
made to this Agreement at that time by written agreement of the parties. 

11 

 
 
 
 
 
 
ARTICLE 4 
CHANGE OF CONTROL 

4.1. 

Effect of Change of Control.  In the event of a Change of Control of EFI during the 

term of this Agreement, or any renewal of this Agreement the following provisions shall apply: 

(a) 

If upon the Change of Control 

(i) 

Employee is not retained by EFI or its successor (whether direct or 
indirect,  by  purchase  of  assets,  merger,  consolidation,  exchange  of  securities, 
amalgamation, arrangement or otherwise) to all or substantially all of the business 
and/or assets of EFI (“Successor”) on the same terms and conditions as set out in 
this Agreement and in circumstances that would not constitute Good Reason (where 
Good Reason is determined by reference to Employee’s employment status prior to 
the  Change  of  Control  and  prior  to  any  other  event  that  could  constitute  Good 
Reason); and/or 

(ii) 

any such Successor does not, by agreement in form and substance 
satisfactory to Employee, expressly assume and agree to perform this Agreement in 
the same manner and to the same extent that EFI would be required to perform it if 
no such succession had taken place, 

then Employee shall be deemed to be terminated without just cause upon such Change of Control 
and shall be entitled to the compensation and all other rights specified in Article 3 in the same 
amount and on the same terms as if terminated without just cause as set out therein, subject to the 
additional rights set out in paragraph (c) below; 

(b) 

All rights of Employee in this Agreement, including without limitation all 
rights to severance and other rights upon a termination with or without cause, with or without Good 
Reason, upon a disability or upon death under Article 3 of this Agreement shall continue after a 
Change of Control in the same manner as before the Change of Control, subject to the additional 
rights set out in paragraph (c) below; 

(c) 

if, 

(i) 

there is a deemed termination without cause under Section 4.1(a); or 

(ii) 

within twelve (12) months following the effective date of the Change 
of Control, EFI, or its successor, terminates the employment of Employee without 
just cause or by reason of Disability, or Employee terminates his or her employment 
under this Agreement for Good Reason, 

12 

 
 
 
 
 
 
 
 
 
 
then, in addition to the other rights Employee has under this Agreement, and notwithstanding any 
other provision in this Agreement, all of the stock options previously granted to Employee that have 
neither vested nor expired will automatically vest and become immediately exercisable, any period 
of  restriction  and  other  restrictions  imposed  on  all  RSUs  shall  lapse,  and  all  RSUs  shall  be 
immediately settled and payable, and all other securities awarded shall vest and/or accelerate in 
accordance with Article 16 of the EFI Omnibus Equity Incentive Plan or the comparable provisions 
of any other equity incentive plan under which such securities may have been issued. Employee 
will have ninety (90) days from the effective date of the termination of Employee’s employment to 
exercise any stock options which had vested as of the effective date of termination and thereafter 
Employee’s stock options will expire and Employee will have no further right to exercise the stock 
options. 

4.2.  Definitions  of  Change  of  Control  and  Good  Reason.  For  the  purposes  of  this 

Agreement, 

(a) 

“Change of Control” will mean the happening of any of the following events: 

(i) 

any transaction at any time and by whatever means pursuant to which 
(A) EFI goes out of existence by any means, except for any corporate transaction or 
reorganization in which the proportionate voting power among holders of securities 
of  the  entity  resulting  from  such  corporate  transaction  or  reorganization  is 
substantially  the  same  as  the  proportionate  voting  power  of  such  holders  of  EFI 
voting securities immediately prior to such corporate transaction or reorganization 
or (B) any Person (as defined in the Securities Act (Ontario)) or any group of two 
or  more  Persons  acting  jointly  or  in  concert  (other  than  EFI,  a  wholly-owned 
Subsidiary of EFI, an employee benefit plan of EFI or of any of its wholly-owned 
Subsidiaries (as defined in the Securities Act (Ontario)), including the trustee of any 
such  plan  acting  as  trustee)  hereafter  acquires  the  direct  or  indirect  “beneficial 
ownership” (as defined by the Business Corporations Act (Ontario)) of, or acquires 
the right to exercise control or direction over, securities of EFI representing 50% or 
more  of  EFI’s  then  issued  and  outstanding  securities  in  any  manner  whatsoever, 
including, without limitation, as a result of a take-over bid, an exchange of securities, 
an  amalgamation  of  EFI  with  any  other  entity,  an  arrangement,  a  capital 
reorganization or any other business combination or reorganization; 

(ii) 

the sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, whether or not related, to a Person 
or any group of two or more Persons acting jointly or in concert, other than a wholly- 
owned Subsidiary of EFI; 

(iii) 

the dissolution or liquidation of EFI except in connection with the 
distribution  of  assets  of  EFI  to  one  or  more  Persons  which  were  wholly-owned 
Subsidiaries of EFI immediately prior to such event; 

13 

 
 
 
 
 
 
(iv) 

the  occurrence  of  a  transaction  requiring  approval  of  EFI’s 
shareholders whereby EFI is acquired through consolidation, merger, exchange of 
securities, purchase of assets, amalgamation, arrangement or otherwise by any other 
Person  (other  than  a  short  form  amalgamation  or  exchange  of  securities  with  a 
wholly-owned Subsidiary of EFI); 

(v) 

a  majority  of  the  members  of  the  Board  of  Directors  of  EFI  are 
replaced or changed  as  a  result of or in  connection with any:  (A) take-over bid, 
consolidation, merger, exchange of securities, amalgamation, arrangement, capital 
reorganization  or  any  other  business  combination  or  reorganization  involving  or 
relating to EFI; (B) sale, assignment or other transfer of all or substantially all of the 
assets of EFI in one or a series of transactions, or any purchase of assets; or (C) 
dissolution or liquidation of EFI; 

(vi) 

during any two-year period, a majority of the members of the Board 
of Directors of EFI serving at the date of this Agreement is replaced by directors 
who are not nominated and approved by the Board of Directors of EFI; 

(vii) 

an event set forth in (i), (ii), (iii), (iv), (v) or (vi) has occurred with 
respect to EFRI or any of its direct or indirect parent companies, in which case the 
term “EFI” in those paragraphs will be read to mean “EFRI or such parent company” 
and the phrase “wholly-owned Subsidiary(ies)” will be read to mean “Affiliate(s) 
or wholly-owned Subsidiary(ies)”; or 

(viii) 

the Board of Directors of EFI passes a resolution to the effect that, 

an event set forth in (i), (ii), (iii), (iv), (v), (vi) or (vii) above has occurred. 

(b) 

“Good Reason” means, without the written agreement of Employee, there 

(i) 

a material reduction or diminution in the level of responsibility, or 
office  of  Employee,  provided  that  before  any  claim  of  material  reduction  or 
diminution of responsibility may be relied upon by Employee, Employee must have 
provided written notice to Employee’s supervisor and the EFI’s Board of Directors 
of the alleged material reduction or diminution of responsibility and have given EFI 
at least thirty (30) calendar days within which to cure the alleged material reduction 
or diminution of responsibility; 

(ii) 

a  reduction  in  the  Employee’s  Base  Salary,  Target  Cash  Bonus 

Percentage or Target Equity Award Percentage; or 

(iii) 

a  proposed,  forced  relocation  of  Employee  to  another  geographic 
location greater than fifty (50) miles from Employee’s office location at the time a 
move is requested after a Change of Control. 

14 

is: 

 
 
 
 
 
 
 
 
 
ARTICLE 5 
CONFIDENTIALITY 

5.1. 

Position  of Trust and  Confidence.  Employee acknowledges that in  the  course of 
discharging his or her responsibilities, he or she will occupy a position of trust and confidence with 
respect to the affairs and business of the Company and its customers and clients, and that he or she 
will have access to and be entrusted with detailed confidential information concerning the present 
and contemplated mining and exploration projects, prospects, and opportunities of the Company. 
Employee acknowledges that the disclosure of any such confidential information to the competitors 
of the Company or to the general public would be highly detrimental to the best interests of the 
Company.  Employee  further  acknowledges  and  agrees  that  the  right  to  maintain  such  detailed 
confidential information constitutes a proprietary right which the Company is entitled to protect. 

5.2.  Definition  of  Confidential  Information.  In 

this  Agreement,  “Confidential 
Information” means any information disclosed by or on behalf of the Company to Employee or 
developed by Employee in the performance of his or her responsibilities at any time before or after 
the  execution  of  this Agreement,  and  includes  any  information,  documents,  or  other  materials 
(including, without limitation, any drawings, notes, data, reports, photographs, audio and/or video 
recordings, samples and the like) relating to the business or affairs of the Company or its respective 
customers, clients or suppliers that is confidential or proprietary, whether or not such information: 

(i) 

is reduced to writing; 

(ii) 

was created or originated by an employee; or 

(iii) 

is designated or marked as “Confidential” or “Proprietary” or some 

other designation or marking. 

The Confidential Information includes, but is not limited to, the following categories of information 
relating to the Company: 

(a) 

information  concerning  the  present  and  contemplated  mining,  milling, 
processing and exploration projects, prospects and opportunities, including joint venture projects, 
of the Company; 

(b) 

information  concerning  the  application  for  permitting  and  eventual 
development or construction of the Company’s properties, the status of regulatory and environmental 
matters, the compliance status with respect to licenses, permits, laws and regulations, property and 
title matters and legal and litigation matters; 

15 

 
 
 
 
 
 
 
 
 
(c) 

information  of  a  technical  nature  such  as  ideas,  discoveries,  inventions, 
improvements, trade secrets, now-how, manufacturing processes, specifications, writings and other 
works of authorship; 

(d) 

financial  and  business  information  such  as  the  Company’s  business  and 
strategic  plans,  earnings,  assets,  debts,  prices,  pricing  structure,  volume  of  purchases  or  sales, 
production, revenue and expense projections, historical financial statements, financial projections 
and budgets, historical and projected sales, capital spending budgets and plans, or other financial 
data  whether  related  to  the  Company’s  business  generally,  or  to  particular  products,  services, 
geographic areas, or time periods; 

(e) 

supply and service information such as goods and services suppliers’ names 
or addresses, terms of supply or service contracts of particular transactions, or related information 
about potential suppliers to the extent that such information is not generally known to the public, 
and to the extent that the combination of suppliers or use of a particular supplier, although generally 
known or available, yields advantages to the Company, the details of which are not generally known; 

(f) 

marketing information, such as details about ongoing or proposed marketing 
programs or agreements by or on behalf of the Company, sales forecasts or results of marketing 
efforts or information about impending transactions; 

(g) 

personnel information relating to employees, contractors, or agents, such as 
personal histories, compensation or other terms of employment or engagement, actual or proposed 
promotions, hirings, resignations, disciplinary actions, terminations or reasons therefor, training 
methods, performance, or other employee information; 

(h) 

customer  information,  such  as  any  compilation  of  past,  existing  or 
prospective  customer’s names, addresses, backgrounds,  requirements,  records of purchases and 
prices, proposals or agreements between customers and the Company, status of customer accounts 
or credit, or related information about actual or prospective customers; 

(i) 

computer software of any type or form and in any stage of actual or anticipated 
development, including but not limited to, programs and program modules, routines and subroutines, 
procedures,  algorithms,  design  concepts,  design  specifications  (design  notes,  annotations, 
documentation, float charts, coding sheets, and the like), source codes, object code and load modules, 
programming, program patches and system designs; and 

(j) 

all information which becomes known to Employee as a result of Employee’s 
employment by the Company, which Employee acting reasonably, believes or ought to believe is 
confidential or proprietary information from its nature and from the circumstances surrounding its 
disclosure to Employee. 

16 

 
 
 
 
 
 
 
 
5.3.  Non-Disclosure.  Employee, both during his or her employment and for a period of 
five (5) years after the termination of his or her employment irrespective of the time, manner or 
cause of termination, will: 

(a) 

retain in confidence all of the Confidential Information; 

(b) 

refrain from disclosing to any person including, but not limited to, customers 
and suppliers of the Company, any of the Confidential Information except for the purpose of carrying 
out Employee’s responsibilities with the Company, and 

(c) 

refrain from directly or indirectly using or attempting to use such Confidential 
Information in any way, except for the purpose of carrying out Employee’s responsibilities with the 
Company. 

Employee shall deliver promptly to the Company, at the termination of Employee’s employment, 
or at any other time at the Company’s request, without retaining any copies, all documents and other 
material in Employee’s possession relating, directly or indirectly, to any Confidential Information. 

It is understood that should Employee be subject to subpoena or other legal process to seek the 
disclosure of such Confidential Information, Employee will advise the Company of such process 
and  provide  the  Company  with  the  necessary  information  to  seek  to  protect  the  Confidential 
Information. 

5.4.  Whistleblower Laws.  The  foregoing  obligations of  confidentiality set  out in  this 
Article 5 are subject to applicable whistleblower laws, which protect Employee’s right to provide 
information to governmental and regulatory authorities, including communications with the U.S. 
Securities and Exchange Commission about  possible  securities law violations.  Notwithstanding 
any other provision in this Agreement, Employee is not required to seek the Company’s permission 
or notify the Company of any communications made in compliance with applicable whistleblower 
laws, and the Company will not consider any such communications to violate this Agreement or 
any  other  agreement  between  Employer  and  the  Company  or  any  Company  policy  by  which 
Employee is bound. 

ARTICLE 6 
NON-SOLICITATION 

6.1.  Non-Solicitation.  Employee  agrees  that  during  the  period  (the  “Non-Solicitation 
Period”) commencing on the date of this Agreement and ending twelve (12) months after the effective 
date of the termination of Employee’s employment irrespective of the time, manner or cause of 
termination, Employee will not, either individually or in partnership or jointly or in conjunction 
with any other person, entity or organization, as principal, agent, consultant, contractor, employer, 
employee or in any other manner, directly or indirectly: 

17 

 
 
 
 
 
 
 
 
 
 
(a) 

solicit  business  from  any  customer,  client  or  business  relation  of  the 
Company,  or  prospective  customer,  client  or  business  relation  that  the  Company  was  actively 
soliciting, whether or not Employee had direct contact with such customer, client or business relation, 
for the benefit or on behalf of any person, firm or corporation operating a business which competes 
with the Company, or attempt to direct any such customer, client or business relation away from 
the Company or to discontinue or alter any one or more of their relationships with the Company; 
or 

(b) 

hire or offer to hire or entice away or in any other manner persuade or attempt 
to persuade any officer, employee, consultant, independent contractor, agent, licensee, supplier, or 
business relation of the Company to discontinue or alter any one of their relationships with the 
Company. 

6.2.  Remedies  for  Breach  of  Restrictive  Covenants.  Employee  acknowledges  that  in 
connection with Employee’s employment he or she will receive or will become eligible to receive 
substantial benefits and compensation.  Employee acknowledges that Employee’s employment by 
the Company and all compensation and benefits from such employment will be conferred by the 
Company upon Employee only because and on the condition of Employee’s willingness to commit 
Employee’s  best  efforts  and  loyalty  to  the  Company,  including  protecting  the  Company’s 
confidential information and abiding by the non-solicitation covenants contained in this Agreement. 
Employee understands that his obligations set out in Article 5 and this Article 6 will not unduly 
restrict or curtail Employee’s legitimate efforts to earn a livelihood following any termination of 
his or her employment with the Company. Employee agrees that the restrictions contained in Article 
5 and this Article 6 are reasonable and valid and all defenses to the strict enforcement of these 
restrictions  by  the  Company  are  waived  by  Employee.  Employee  further  acknowledges  that  a 
breach or threatened breach by Employee of any of the provisions contained in Article 5 or this 
Article 6 would cause the Company irreparable harm which could not be adequately compensated 
in damages alone.  Employee further acknowledges that it is essential to the effective enforcement 
of this Agreement that, in addition to any other remedies to which the Company may be entitled at 
law or in equity or otherwise, the Company will be entitled to seek and obtain, in a summary manner, 
from any Court having jurisdiction, interim, interlocutory, and permanent injunctive relief, specific 
performance and other equitable remedies, without bond or other security being required. In addition 
to any other remedies to which the Company may be entitled at law or in equity or otherwise, in 
the event of a breach of any of the covenants or other obligations contained in this Agreement, the 
Company will be entitled to an accounting and repayment of all profits, compensation, royalties, 
commissions, remuneration or benefits which Employee directly or indirectly, has realized or may 
realize relating to, arising out of, or in connection with any such breach. Should a court of competent 
jurisdiction declare any of the covenants set forth in Article 5 or this Article 6 unenforceable, the 
court shall be empowered to modify and reform such covenants so as to provide relief reasonably 
necessary to protect the interests of the Company and Employee and to award injunctive relief, or 
damages, or both, to which the Company may be entitled. 

18 

 
 
 
ARTICLE 7 
GENERAL PROVISIONS 

7.1.  Governing Law.  This Agreement shall be governed by and construed in accordance 

with the laws of the state of Colorado. 

7.2.  Assignability. This Agreement is personal to Employee and without the prior written 
consent of the Company shall not be assignable by Employee other than by will or the laws of 
descent  and  distribution.  This Agreement  shall  inure  to  the  benefit  of  and  be  enforceable  by 
Employee’s legal representatives and heirs.  This Agreement shall also inure to the benefit of and 
be binding upon the Company and its successors and assigns. 

7.3.  Withholding.  The Company may withhold from any amounts payable under this 
Agreement such federal, state or local taxes as shall be required to be withheld pursuant to any 
applicable law or regulation. 

7.4. 

Entire Agreement; Amendment. This Agreement constitutes the  entire agreement 
and understanding between Employee and the Company with respect to the subject matter hereof 
and,  except  as  otherwise  expressly  provided  herein,  supersedes  any  prior  agreements  or 
understandings, whether written or oral, with respect to the subject matter hereof, including without 
limitation  all  employment,  severance  or  change  of  control  agreements  previously  entered  into 
between Employee and the Company. Except as may be otherwise provided herein, this Agreement 
may not be amended or modified except by subsequent written agreement executed by both parties 
hereto. 

7.5. 

Section 409A. This Agreement is intended to comply with Section 409Ato the extent 
Section 409A  is  applicable  to  this  Agreement.  Notwithstanding  any  other  provision  of  this 
Agreement to the contrary, this Agreement shall be interpreted, operated and administered by the 
Company in a manner consistent with such intention and to avoid the pre-distribution inclusion in 
income of amounts deferred under this Agreement and the imposition of any additional tax or interest 
with respect thereto.  Notwithstanding any other provision of this Agreement to the contrary, to the 
extent that any payment under this Agreement constitutes “nonqualified deferred compensation” 
under Section 409A, the following shall apply to the extent Section 409A is applicable to such 
payment: 

(a) 

Any  payable  that  is  triggered  upon  the  Employee’s  termination  of 
employment shall be paid only if such termination of employment constitutes a “separation from 
service” under Section 409A; and 

(b) 

All expenses or other reimbursements paid pursuant to this Agreement that 
are taxable income to Employee shall be paid no later than the end of the calendar year next following 
the calendar year in which Employee incurs such expense. With regard to any provision herein that 

19 

 
 
 
 
 
 
 
 
provides for reimbursement of costs and expenses or in-kind benefits, except as permitted by Section 
409A,  (a)  the  right  to  reimbursement  or  in-kind  benefits  shall  not  be  subject  to  liquidation  or 
exchange for another benefit, (b) the amount of expenses eligible for reimbursement, or in-kind 
benefits, provided during any taxable year shall not affect the expenses eligible for reimbursement, 
or in-kind benefits to be provided, in any other taxable year; and (c) such payments shall be made 
on or before the last day of Employee’s taxable year following the taxable year in which the expense 
occurred.  For purposes of Section 409A, Employee’s right to receive installment payments of any 
severance amount, if applicable, shall be treated as a right to receive a series of separate and distinct 
payments. 

In the event that Employee is deemed on the date of termination to be a “specified employee” as 
defined in Section 409A, then with regard to any payment or the provision of any benefit that is 
subject to Section 409A and is payable on account of a separation from service (as defined in 
Section 409A), such payment or benefit shall be delayed for until the earlier of (a) the first 
business day of the seventh calendar month following such termination of employment, or (b) 
Employee’s death.  Any payments delayed by reason of the prior sentence shall be paid in a  
single lump sum, without interest thereon, on the date indicated by the previous sentence and any 
remaining payments due under this Agreement shall be paid as otherwise provided herein. 

7.6.  Multiple Counterparts.  This Agreement may be executed in multiple counterparts, 

each of which shall constitute an original, but all of which together shall constitute one Agreement. 

7.7.  Notices. Any notice provided for in this Agreement shall be deemed delivered upon 
deposit in the  United States  mails, registered or certified mail, addressed to the  party to whom 
directed at the addresses set forth below or at such other addresses as may be substituted therefor 
by notice given hereunder.  Notice given by any other means must be in writing and shall be deemed 
delivered only upon actual receipt. 

If to the Company: 

c/o Energy Fuels Resources (USA) Inc. 
225 Union Blvd., Suite 600 
Lakewood, CO 80228 

Attention:  Chairman of the Board of Energy Fuels Inc. 

20 

 
 
 
 
 
 
 
If to Employee: 

Mark S. Chalmers 
13019 W. 73rd Place 
Arvada, CO 80005 

7.8.  Waiver. The waiver of any term or condition of this Agreement, or any breach thereof, 
shall not be deemed to constitute the waiver of the same or any other term or condition of this 
Agreement, or any breach thereof. 

7.9. 

Severability.  In  the  event  any  provision  of  this  Agreement  is  found  to  be 
unenforceable or invalid, such provision shall be severable from this Agreement and shall not affect 
the enforceability or  validity of  any other provision of this Agreement.  If any provision of this 
Agreement is capable of two constructions, one of which would render the provision void and the 
other  that  would  render  the  provision  valid,  then  the  provision  shall  have  the  construction  that 
renders it valid. 

7.10.  Arbitration  of  Disputes.  Except  for  disputes  and  controversies  arising  under 
Articles 5 or 6 or involving equitable or injunctive relief, any dispute or controversy arising under 
or in connection with this Agreement shall be conducted in accordance with the Colorado Rules of 
Civil Procedure and, unless the parties mutually agree on an arbitrator shall be arbitrated by striking 
from a list of potential arbitrators provided by the Judicial Arbiter Group in Denver, Colorado.  If 
the parties are unable to agree on an arbitrator, the arbitrator will be selected from a list of seven 
(7)  potential  arbitrators  provided  by  the  Judicial Arbiter  Group  in  Denver.  The  Company  and 
Employee will flip a coin to determine who will make the first strike. The parties will then alternate 
striking from the list until there is one arbitrator remaining, who will be the selected arbitrator. 
Unless the parties otherwise agree and subject to the availability of the arbitrator, the arbitration 
will be heard within sixty (60) days following the appointment, and the decision of the arbitrator 
shall be binding on Employee and the Company and will not be subject to appeal.  Judgment may 
be entered on the arbitrator’s award in any court having jurisdiction. 

7.11.  Currency.  Except  as  expressly  provided  in  this Agreement,  all  amounts  in  this 

Agreement are stated and shall be paid in United States dollars ($US). 

7.12.  Company’s  Maximum  Obligations.  The  compensation  set  out  in  this Agreement 
represents the Company’s maximum obligations, and other than as set out herein, Employee will 
not  be  entitled  to  any  other  compensation,  rights  or  benefits  in  connection  with  Employee’s 
employment or the termination of Employee’s employment. 

7.13.  Full Payment;  No Mitigation Obligation.  The Company’s obligation to make the 
payments provided for in this Agreement and otherwise to perform its obligations hereunder shall 

21 

 
 
 
 
 
 
 
 
be subject to any set-off, counterclaim, recoupment, defense or other claim, right or action which 
the Company may have against Employee. 

IN WITNESS WHEREOF, the parties have executed this Agreement as of the Effective 

Date. 

ENERGY FUELS INC. 

By: 

/s/ J. Birks Bovaird 

Name: J. Birks Bovaird 
Title:  Chairman of the Board 
Date:   February 1, 2018 

ENERGY FUELS RESOURCES (USA) INC. 

By: 

/s/ David C. Frydenlund 

Name: David C. Frydenlund 
Title:  Sr. Vice President, General Counsel and 
Corporate Secretary 
Date:   February 1, 2018 

/s/ Mark S. Chalmers 

By: 
Name:  Mark S. Chalmers 
Title:  President and Chief Executive Officer 
Date:  February 1, 2018 

22 

 
 
 
 
 
 
 
 
 
 
 
EXHIBIT A 
JOB DESCRIPTION 

Employee will discharge the responsibilities and exercise the authority expected of a President and 
Chief Executive Officer of a public mining company.  More specifically, in addition to exercising 
general control of and supervision over the Company’s affairs, the following are the responsibilities 
of the President and Chief Executive Officer: 

A.  Foster  a  corporate  culture  that  promotes  ethical  practices,  encourages  individual 

integrity and fulfills social responsibility; 

B.  Maintain a positive and ethical work climate that is conducive to attracting, retaining 

and motivating a diverse group of top-quality employees at all levels; 

C.  Develop and recommend to the Board, a long-term strategy and vision for the Company 

that leads to the creation of shareholder value; 

D.  Develop and recommend to the Board, annual business plans and budgets that support 

the Company’s long term strategy; 

E.  Determine the appropriate use of technology; 

F.  Develop and recommend to the Board, the allocation of capital necessary to achieve 

the Company’s business plan; 

G.  Ensure that the day-to-day business affairs of the Company are appropriately managed, 
including  evaluation  of  the  Company’s  operating  performance  and  initiating 
appropriate action where required; 

H.  Consistently  strive  to  achieve  the  Company’s  financial  and  operating  goals  and 

objectives; 

I. 

J. 

Ensure  fair  presentation  of  the  financial  condition  of  the  Company  in  continuous 
disclosure documents, and oversight and assessment of internal and disclosure controls 
of the Company; 

Ensure that the Company builds and maintains a strong positive relationship with its 
investors; 

K.  Ensure that the Company achieves and maintains a competitive position within the 

industry; 

23 

 
 
 
 
 
 
 
 
 
 
 
 
 
L.  Ensure that the Company builds and maintains a strong positive relationship with its 

employees; 

M.  Ensure that the Company has an effective management team below the level of CEO 

and has an active plan for their development and succession; 

N.  Formulate and oversee the implementation of major corporate policies; 

O.  Ensure compliance with the Company’s Corporate Disclosure Policy, Environment, 

Health and Safety Policy and other policies; 

P.  Build and maintain strong relationships with the corporate and public community; and 

Q.  Ensure management support for Board Committees. 

Employee shall report to the Board of Directors of EFI. 

This position will be located in the Lakewood office with frequent travel as required. 

Performance is to be based on Board-approved Performance Goals pursuant to EFI’s STIP and 
LTIP, which will be evaluated once per year. 

24 

 
 
 
 
 
 
 
(USA) Inc. 

EXHIBIT 10.11 

Energy Fuels Resources 

225 Union Blvd.  Suite 600 
Lakewood, CO, US, 80228 
303 974 2140 
www.energyfuels.com 

THIS PROFESSIONAL SERVICES AGREEMENT is made as of the 2nd day of March, 2018 

BETWEEN: 

ENERGY FUELS RESOURCES (USA) INC., a Delaware Corporation, 
having its offices at 225 Union Blvd., Suite 600, Lakewood, Colorado, United 
States of America 80228 

(Hereinafter “EFRI”) 

OF THE FIRST PART 

-and- 

Daniel G. Zang, an accounting specialist (hereinafter “Contractor”). 

OF THE SECOND PART. 

WHEREAS EFRI wishes to enter into a professional services agreement with Contractor as a consultant 

to EFRI, by entering into this agreement (the “Agreement”), 

NOW THEREFORE in consideration of the mutual covenants and agreements hereinafter contained, 

the parties hereto agree as follows: 

1. 

2. 

3. 

Services & Responsibilities. Contractor  shall  perform  the  services  (the  “Services”)  as  detailed  in 
Exhibit “A” - “Scope of Services” which Exhibit shall be deemed a part hereof.  Each change in the 
Services must be authorized in advance in writing by EFRI. Contractor shall not have the power and 
authority to sign any instruments that obligate or bind EFRI or any of its affiliates.  Nothing contained 
in this Section 1 shall alter the status of Contractor as an independent contractor. 

Term of Agreement.  The term of this Agreement shall commence on March 2, 2018 and shall continue 
until terminated in accordance with Section 9 hereof (the “Professional Services Period”). 

Compensation.  As  full  consideration  for  performance  hereunder,  EFRI  will  pay  Contractor 
according to Exhibit “B” - “Compensation for Services” which shall be deemed a part hereof.   The 

1 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4. 

5. 

6. 

7. 

8. 

consideration set forth in this Section 3 shall be the sole consideration due Contractor for the Services 
rendered hereunder, and it is understood that EFRI will not withhold any amounts for payment of taxes 
from the compensation of Contractor hereunder.  Contractor will not represent to be or hold himself out 
as an employee of EFRI or any of its affiliates, and Contractor acknowledges that he shall not have the 
right or entitlement in or to any of the equity compensation, bonus, pension, retirement, vacation or any 
other benefit programs now or hereafter available to EFRI’s regular employees. Contractor acknowledges 
his obligation to report and pay all federal, state and local taxes or assessments of any kind that a self- 
employed individual must pay. Contractor further covenants with EFRI that he will not at any time assert 
any claims against EFRI or any of its affiliates that he is entitled to any type of compensation as a statutory 
or common law employee of EFRI or any of its affiliates for any services provided during the term of 
this Agreement or any renewal thereof. 

Invoicing and Payment.    The  total  compensation  will  be  paid  upon  receipt  of  proper  invoices  by 
the Chief Financial Officer on or about the last day of each month, as agreed in writing between EFRI 
and Contractor as set out in Exhibit “B”.  Properly documented expense reports shall be an integral part 
of the invoice.  Also included as part of each invoice shall be a brief report outlining the activities and/ 
or the accomplishments achieved during the month. 

Stock Options and Restricted Stock Units.Your existing Energy Fuels Stock Options will continue to 
vest and remain exercisable, and your existing Restricted Stock Units will continue to vest, in both cases 
for the duration of the Professional Services Period. 

Compliance  with  Law  and  Corporate  Policy.  In the performance of the Services, Contractor shall 
comply with and observe all applicable laws,  regulations  and orders of  any proper  authority having 
jurisdiction over the Services together with all Corporate Policies of EFRI in effect from time to time. 
This Agreement shall be governed by and construed in accordance with the laws of the State of Colorado. 

Performance of Duties.     Contractor  shall  perform  his  duties  faithfully,  efficiently  and effectively 
and during the term of this Agreement shall devote such portion of his business time to the business 
affairs of EFRI and its affiliates as is reasonably necessary to accomplish the performance of the Services. 
The parties agree that Contractor’s engagement to provide Services is non-exclusive. 

Confidentiality.  In  consideration  of  the  payments  made  under  this  Agreement,  Contractor  hereby 
acknowledges and agrees that, as a contractor providing Services during the term of this Agreement, 
Contractor’s relationship with EFRI is one of high trust and confidence and that Contractor has access 
to  and  will  make  use  of  a  variety  of  proprietary  information  of  EFRI  and  its  affiliates,  including 
information relating to EFRI’s and its affiliates’ business and affairs, including without limitation, its 
assets, profits, profit margins, revenues, costs of production, transportation costs, marketing and sales 
costs, budgets, business plans, regulatory compliance status, legal actions, software programs, manuals, 
guides, customer lists, client proposals, technical, geological and engineering data, maps, reports and 
analyses, process and mining technology, and other confidential documents and communications within 
or concerning EFRI and its affiliates and predecessors and previous owners and operators of EFRI’s 
assets which are not freely available to outsiders (herein collectively called “Proprietary Information”). 

Contractor covenants and agrees that (i) Contractor will not use for his own benefit or the benefit of any 
other party and will not disclose to any third party any Proprietary Information in Contractor’s possession 
or control without the express written consent of EFRI; and (ii) at the termination of this Agreement, 
Contractor  will  return  all  EFRI  Proprietary  Information  then  in  Contractor’s  possession  or  control, 

2 

 
 
 
 
 
 
 
including without limitation all files, data, computer software and programs, work in progress, customer 
lists, business plans, contracts, business proposals, cost and financial reports and analyses, and technical, 
geological and engineering reports and analyses, and further agrees to retain no duplicates or copies of 
any EFRI Proprietary Information without the express written consent of EFRI. 

The foregoing provisions, and all other provisions of this Agreement, are in addition to and do not alter 
or  reduce  any  continuing  provisions  or  obligations  contained  in  or  arising  from  the  Employment 
Agreement made effective March 1, 2016 between Contractor, EFRI and Energy Fuels Inc. 

9. 

Termination. 

EFRI may terminate this Agreement for “Cause” at any time after providing notice to Contractor.  For 
purposes of this Agreement, “Cause” shall mean the following: (1) conviction of a crime involving a 
felony or, in the good faith judgment of EFRI, fraud, dishonesty, or moral turpitude; (2) deliberate and 
continual refusal to perform Services reasonably requested by EFRI; (3) fraud or embezzlement; (4) 
gross misconduct or gross negligence in connection with the business of EFRI; or (5) breach of any 
provision of this Agreement. Any determination of “cause” under this Agreement shall be made by EFRI 
after giving Contractor a reasonable opportunity to be heard.  Termination for cause shall be effective 
upon the date of the notice by EFRI to Contractor of such termination. 

EFRI or Contractor may terminate this Agreement  without Cause at any  time after June 2, 2018 by 
providing no less than thirty (30) days written notice. 

In the event this Agreement is terminated without Cause, or expires by its terms, Contractor shall submit 
a final invoice for payment to EFRI. EFRI shall deliver a final payment to Contractor within ten (10) 
business days for any undisputed amounts. 

10. 

Notices. 
Any notice required or permitted to be given hereunder shall be in writing and shall be 
sufficiently given if hand delivered or if mailed by prepaid registered mail addressed to the other party 
at the following addresses or to such other addresses as the parties may advise each other from time to 
time in writing. 

If to Contractor: 

If to EFRI: 

Daniel G. Zang 
11896 W. Security Ave. 
Lakewood, CO 80401-4432 

225 Union Blvd., Suite 600 
Lakewood, Colorado 80228 USA 
Attention:  David C. Frydenlund 

Any notice shall be deemed to have been received by the parties (a) if hand delivered and/or emailed on 
the date of delivery, or (b) if mailed on the fourth business day following the date of mailing, provided, 
that  in  the  event  of  disruption  of  the  postal  system  for  any  reason  whatsoever,  notice  shall  only  be 
sufficiently delivered by hand. 

11. 

Contractor  understands  that  he  has  been  selected  by  EFRI  to 
Assignment; Binding Effect. 
provide the Services on the basis of his personal qualifications, experience and skills.  Contractor agrees, 
therefore, that he cannot assign all or any portion of his performance under this Agreement without the 

3 

 
 
 
 
 
 
 
 
 
 
 
prior written consent of EFRI.  Subject to the preceding two sentences, this Agreement shall be binding 
upon, inure to the benefit of, and be enforceable by the parties hereto and their respective heirs, legal 
representatives, successors, and assigns. 

12. 

13. 

14. 

Arbitration. Any  dispute  arising  in  connection  with  this  Agreement  or  Contractor’s  provision  of 
Services to EFRI shall be submitted to binding arbitration by an arbitrator with Judicial Arbiters Group 
(“JAG”) under the American Arbitration Association’s (“AAA”) rules for the resolution of disputes, in 
Denver, Colorado. Judgment upon any award rendered by arbitration may be entered in any court having 
jurisdiction thereof. The attorney’s fees and costs of the prevailing party in connection with the arbitration, 
as well as any costs of AAA, JAG, and the arbitrator shall be assessed against the losing party. 

Survival.  The  provisions  set  forth  in  Paragraphs  8  and  12  shall  survive  the  termination  of  this 
Agreement. 

Entire Agreement.  This Agreement (together with the Exhibits attached hereto) represents the entire 
understanding and agreement concerning the Services.  Each of the parties shall from time to time and, 
at all times, do all further acts and execute and deliver all such further documents and assurances, as 
may be reasonably required, in order to fully perform and carry out the terms of this Agreement.  This 
Agreement supersedes all prior understandings and agreements, whether written or oral, relating to the 
terms of this agreement, unless otherwise specified herein. 

IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the 2nd  day of March, 
2018. 

ENERGY FUELS RESOURCES (USA) 
INC. 

DANIEL G. ZANG 

By:  /s/ Mark S. Chalmers 
Name:  Mark S. Chalmers 
Title:  President & CEO 

By:  /s/ Daniel G. Zang 
Daniel G. Zang 
Accounting Specialist 

4 

 
 
 
 
 
 
 
 
 
 
 
EXHIBIT “A” 

Scope of Services 

AS REQUESTED BY THE CHIEF FINANCIAL OFFICER 

Upon the reasonable request of EFRI’s Chief Financial Officer (the “Authorized EFRI Officer”), Contractor 
shall provide services to EFRI on a project-by-project basis in areas of financial statement preparation, cost 
accounting, internal controls, SOX compliance, budgeting, financial planning, financial analysis of projects, 
transitional matters and as otherwise may be required by EFRI and within Contractor’s areas of expertise.  The 
Contractor shall spend time in the offices of EFRI as reasonably requested by the Authorized EFRI Officer or 
as may be required to complete any work or projects requested by the Authorized EFRI Officer.  Contractor 
shall adhere to the following schedule unless requested otherwise by the Authorized EFRI Officer: 

•  Contractor shall be available to perform services hereunder at the request of EFRI generally for a minimum 
of ten (10) working days per month consisting of 8 hours per day, on reasonable notice by the Company. 
Any additional hours or days shall be subject to Contractor’s availability and agreement.  It is understood 
that Contractor reserves the right in any month to schedule ten (10) consecutive working days for activities 
not associated with this Agreement. 

•  Contractor’s services hereunder shall be on an as-needed basis as requested by the Chief Financial Officer 
of EFRI, and EFRI shall be under no obligation to engage Contractor to provide any minimum amount 
of services or to pay any minimum amount of fees to Contractor hereunder. 

5 

 
 
 
 
 
 
EXHIBIT “B” 

Compensation for Services 

EFRI shall pay the following amounts to Contractor: 

•  US$250.00 per hour of services performed hereunder at the request of EFRI. 

6 

 
 
 
 
 
 
ENERGY FUELS INC. – ENTITY ORGANIZATION CHART 2018 

1 
50% owned by EFR Colorado Plateau LLC 
50% owned by Mesa Uranium 
2 

81% owned by Uranerz Energy Corporation 
19% owned by United Nuclear, LLC 

3 

99% owned by EFR Recovery Corp., 1% owned by EFHC 

Energy Fuels Inc. 
(Ontario) 

100% 

100% 

100% 

100% 

Magnum Uranium Corp. 
(British Columbia) 

Titan Uranium Inc. 
(Canada) 

100% 

Uranium Power Corp. 
(British Columbia) 

3% 

77% 

20% 

Energy Fuels 
Holdings Corp. 
(Delaware) 

100% 

Energy Fuels Exploration 
Inc. (Ontario) 

Strathmore Minerals Corp. 
(British Columbia) 

100% 

100% 

Wyoming Gold 
Mining Company 
(Wyoming) 

Strathmore 
Resources (US) Ltd. 
(Nevada) 

100% 

Roca Honda Resources 
LLC (Delaware) 

Magnum 
Minerals 
USA Corp. 
(Nevada) 

Energy 
Fuels 
Wyoming 
Inc. 
(Nevada) 

EFR 
Arizona 
Strip  LLC 
(Colorado) 

Energy Fuels 
Resources 
(USA) Inc. 
(Delaware) 

EFR Henry 
Mountains 
LLC 
(Colorado) 

Uranerz 
Energy 
Corp. 
(Nevada) 

Leoncito 
Plant 
LLC 
(Texas) 

Leoncito 
Project, 
LLC 
(Texas) 

EFR Alta 
Mesa 
LLC 
(Texas) 

EFR White 
Mesa  LLC 
(Colorado) 

EFR 
Colorado 
Plateau LLC 
(Colorado) 

EFR 
Properties 
LLC 
(Colorado) 

EFR 
Recovery 
Corp. 
(Delaware) 

100% 

81% 

100% 

100% 

100% 

50% 

EFR White 

Canyon Corp. 
(Delaware) 

Wate Mining 
Company LLC 
(Arizona) 

Arkose Mining 

2 

Venture 

Leoncito 
Restoration 
LLC (Texas) 

Arizona 
Strip 
Partners LLC 
(Delaware) 

Colorado 
Plateau 
Partners LLC 
(Delaware) 

West Lisbon, 
LLC 

1 

(Delaware) 

99% 

EFR Recovery 

3 

LLC (Delaware) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Consent of Independent Registered Public Accounting Firm 

EX 23.1 

The Board of Directors 
Energy Fuels Inc.: 

We  consent  to  the  incorporation  by  reference  in  the  registration  statements  (Nos.  333-217098, 
333-205182, and 333-194900)  on Form S-8 and registration statement (No. 333-210782) on Form 
S-3 of Energy Fuels Inc. of our report dated March 9, 2018, with respect to the consolidated balance 
sheet  of  Energy  Fuels  Inc.  as  of  December  31,  2017,  and  the  related  consolidated  statements  of 
operations and comprehensive loss, changes in equity, and cash flows for the year ended December 
31,  2017,  and  the  related  notes  (collectively,  the  consolidated  financial  statements),  which  report 
appears in the December 31, 2017 annual report on Form 10-K of Energy Fuels Inc. 

Denver, Colorado 
March 9, 2018 

/s/ KPMG LLP 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF ROSCOE POSTLE ASSOCIATES INC. 

Exhibit 23.2 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding (a) the technical report entitled “Technical Report on 
the EZ1 and EZ2 Breccia Pipes, Arizona Strip District, U.S.A.” dated June 27, 2012; (b) the technical 
report entitled “Technical Report on the Henry Mountains Complex Uranium Property, Utah, U.S.A.” 
dated June 27, 2012; (c) the “Technical Report on the Roca Honda Project, McKinley County, State 
of New Mexico, U.S.A." dated October 27, 2016, and (d) the “Technical Report on the Canyon Mine, 
Coconino County, Arizona, USA” dated October 6, 2017 (collectively, the “Technical Disclosures”), 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) 
of Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange 
Commission; 

the incorporation by reference of such Technical Disclosures in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosures in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

ROSCOE POSTLE ASSOCIATES INC. 

/s/ Deborah A. McCombe 
Name: Deborah A. McCombe 
Title: President & CEO 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF WILLIAM E. ROSCOE 

Exhibit 23.3 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding the technical report entitled “Technical Report on the 
Henry Mountains Complex Uranium Property, Utah, U.S.A.” dated June 27, 2012 (the “Technical 
Disclosure”), contained in the Annual Report on Form 10-K for the period ended December 31, 2017 
(the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with the United States Securities and 
Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ William E. Roscoe 
William E. Roscoe, Ph.D. 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF DOUGLAS H. UNDERHILL 

Exhibit 23.4 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding the technical report entitled “Technical Report 
on the Henry Mountains Complex Uranium Property, Utah, U.S.A.” dated June 27, 2012 
(the “Technical Disclosure”), contained in the Annual Report on Form 10-K for the period 
ended December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed 
with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Douglas H. Underhill 
Douglas H. Underhill, Ph.D., C.P.G 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF THOMAS C. POOL 

Exhibit 23.5 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Technical 
Report on the Henry Mountains Complex Uranium Property, Utah, U.S.A.” dated June 27, 
2012, contained in the Annual Report on Form 10-K for the period ended December 31, 
2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with the United States 
Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Thomas C. Pool 
Thomas C. Pool, P.E. 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF ROBERT MICHAUD 

Exhibit 23.6 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the  filing  of  the  written  disclosure  regarding  the  “Technical  Report  on  the  Roca  Honda 
Project,  McKinley  County,  State  of  New  Mexico,  U.S.A."  dated  October  27,  2016  (the 
“Technical Disclosure”), contained in the Annual Report on Form 10-K for the period ended 
December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with 
the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Robert Michaud 
Robert Michaud, Professional Engineer 
Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF STUART E. COLLINS 

Exhibit 23.7 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the  filing  of  the  written  disclosure  regarding  the  “Technical  Report  on  the  Roca  Honda 
Project,  McKinley  County,  State  of  New  Mexico,  U.S.A."  dated  October  27,  2016  (the 
“Technical Disclosure”), contained in the Annual Report on Form 10-K for the period ended 
December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with 
the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Stuart E. Collins 

Stuart E. Collins, Professional Engineer 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF MARK B. MATHISEN 

Exhibit 23.8 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding (a) the “Technical Report on the Roca Honda 
Project,  McKinley  County,  State  of  New  Mexico,  U.S.A."  dated  October  27,  2016  (the 
“Technical  Disclosure”),  and  (b)  the  “Technical  Report  on  the  Canyon  Mine,  Coconino 
County, Arizona, USA” dated October 6, 2017, contained in the Annual Report on Form 
10-K  for  the  period  ended  December  31,  2017  (the  “10-K”)  of  Energy  Fuels  Inc.  (the 
“Company”) being filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/S/ Mark B. Mathisen 
Mark B. Mathisen C.P.G 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 23.9 

CONSENT OF HAROLD R. ROBERTS 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

(iv) 

the  filing  of  the  written  disclosure  regarding  the  “Technical  Report  on  the  Roca  Honda 
Project,  McKinley  County,  State  of  New  Mexico,  U.S.A."  dated  October  27,  2016  (the 
“Technical Disclosure”), contained in the Annual Report on Form 10-K for the period ended 
December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with 
the United States Securities and Exchange Commission; 
the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 
the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 
the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Harold R. Roberts 
Harold R. Roberts, P.E., 
Executive Vice President and Chief Operating Officer of Energy Fuels Inc. 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF DAVID A. ROSS 

Exhibit 23.10 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Technical 
Report on the EZ1 and EZ2 Breccia Pipes, Arizona Strip District, U.S.A.” dated June 27, 
2012, contained in the Annual Report on Form 10-K for the period ended December 31, 
2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed with the United States 
Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(v) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ David A. Ross 
David A. Ross, P.Geo. 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF PETERS GEOSCIENCES 

Exhibit 23.11 

The undersigned hereby consents to: 

(i) 

the filing of the written disclosure (the “Technical Disclosure”) regarding: 
(a) 

the technical report entitled “Updated Report on The Daneros Mine Project, San Juan County, 
Utah, U.S.A.” dated March 2, 2018; 
the  technical  report  entitled  “Updated  Technical  Report  on  Energy  Fuels  Resources 
Corporation’s Whirlwind Property (Including Whirlwind, Far West, and Crosswind Claim 
Groups and Utah State Metalliferous Minerals Lease ML-49312), Mesa County, Colorado 
and Grand County, Utah”, dated March 15, 2011; 
the technical report entitled “Updated Technical Report on Sage Plain Project (Including the 
Calliham Mine), San Juan County, Utah USA” dated March 18, 2015; and 
the technical report entitled “Technical Report on Energy Fuels Inc.’s La Sal District Project,” 
dated March 25, 2014, 

(b) 

(c) 

(d) 

contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) of 
Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange Commission; 

(ii) 

(iii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

PETERS GEOSCIENCES 

/s/ Douglas C. Peters 
Name: Douglas C. Peters 
Title:  President 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF DOUGLAS C. PETERS 

The undersigned hereby consents to: 

Exhibit 23.12 

(i) 

the filing of the written disclosure (the “Technical Disclosure”) regarding: 
(a) 

the technical report entitled “Updated Report on The Daneros Mine Project, San Juan County, 
Utah, U.S.A.” dated March 2, 2018; 
the  technical  report  entitled  “Updated  Technical  Report  on  Energy  Fuels  Resources 
Corporation’s Whirlwind Property (Including Whirlwind, Far West, and Crosswind Claim 
Groups and Utah State Metalliferous Minerals Lease ML-49312), Mesa County, Colorado 
and Grand County, Utah”, dated March 15, 2011; 
the technical report entitled “Updated Technical Report on Sage Plain Project (Including the 
Calliham Mine), San Juan County, Utah USA” dated March 18, 2015; and 
the technical report entitled “Technical Report on Energy Fuels Inc.’s La Sal District Project,” 
dated March 25, 2014, 

(b) 

(c) 

(d) 

contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) of 
Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange Commission; 

(ii) 

(iii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Douglas C. Peters 
Douglas C. Peters, Certified Professional Geologist 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
CONSENT OF BRS INC. 

Exhibit 23.13 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding (a) the technical report 
entitled “Sheep Mountain Uranium Project, Fremont County, Wyoming, USA, Updated Preliminary 
Feasibility  Study,  National  Instrument  43-101  Technical  Report”  dated  April  13,  2012,  (b)  the 
technical  report  entitled  “Nichols  Ranch  Uranium  Project,  43-101 Technical  Report,  Preliminary 
Economic Assessment” dated February 28, 2015, (c) the “Arkose Uranium Project, Mineral Resource 
and Exploration Target, 43-101 Technical Report” dated February 28, 2015, and (d) the “Alta Mesa 
Uranium  Project,  Alta  Mesa  and  Mesteña  Grande  Mineral  Resources  and  Exploration  Target, 
Technical Report National Instrument 43-101”, dated July 19, 2016, contained in the Annual Report 
on  Form  10-K  for  the  period  ended  December  31,  2017  (the  “10-K”)  of  Energy  Fuels  Inc.  (the 
“Company”) being filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

BRS INC. 

/s/ Douglas L. Beahm 
Name: Douglas L. Beahm 
Title: President 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF DOUGLAS L. BEAHM 

Exhibit 23.14 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding (a) the technical report 
entitled “Sheep Mountain Uranium Project, Fremont County, Wyoming, USA, Updated Preliminary 
Feasibility  Study,  National  Instrument  43-101  Technical  Report”  dated  April  13,  2012,  (b)  the 
technical  report  entitled  “Nichols  Ranch  Uranium  Project,  43-101 Technical  Report,  Preliminary 
Economic Assessment” dated February 28, 2015, (c) the “Arkose Uranium Project, Mineral Resource 
and Exploration Target, 43-101 Technical Report” dated February 28, 2015, and (d) the “Alta Mesa 
Uranium  Project,  Alta  Mesa  and  Mesteña  Grande  Mineral  Resources  and  Exploration  Target, 
Technical Report National Instrument 43-101”, dated July 19, 2016, contained in the Annual Report 
on  Form  10-K  for  the  period  ended  December  31,  2017  (the  “10-K”)  of  Energy  Fuels  Inc.  (the 
“Company”) being filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Douglas L. Beahm 
Douglas L. Beahm, P.E., P.G. 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF WILLIAM PAUL GORANSON 

Exhibit 23.15 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Nichols Ranch Uranium 
Project,  43-101  Technical  Report,  Preliminary  Economic Assessment”  dated  February  28,  2015, 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) 
of Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange 
Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ William Paul Goranson 
William Paul Goranson, P.E 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF DOUGLASS H. GRAVES 

Exhibit 23.16 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding (a) the technical report 
entitled “Technical Report, North Rolling Pin Property, Campbell County, Wyoming, U.S.A.” dated 
June 4, 2010, (b) the technical report entitled “Technical Report, West North Butte Satellite Properties, 
Campbell County, Wyoming, U.S.A.” dated December 9, 2008, and (c) the technical report entitled 
“Technical Report, Reno Creek Property, Campbell County, Wyoming, U.S.A.” dated October 13, 
2010, contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the 
“10-K”) of  Energy Fuels  Inc.  (the  “Company”) being  filed with the  United States Securities and 
Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Douglas H. Graves 
Douglass H. Graves, P.E. 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF JOHN H. WHITE 

Exhibit 23.17 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

(iv) 

the filing of the written disclosure regarding certain scientific or technical information concerning 
mineral projects (the “Technical Disclosure”) contained in the Annual Report on Form 10-K for the 
period ended December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being filed 
with the United States Securities and Exchange Commission; 
the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 
the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 
the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ John H. White 
John H. White, P.E., 
Vice President, Technical Services of Energy Fuels Inc. 

Date: March 8, 2018 

 
 
 
 
 
 
 
 
 
CONSENT OF DON R. WOODY 

Exhibit 23.18 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Technical Report, West 
North  Butte  Satellite  Properties,  Campbell  County, Wyoming,  U.S.A.”  dated  December  9,  2008, 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) 
of Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange 
Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Don R. Woody 
Don R. Woody 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF TREC, INC. 

Exhibit 23.19 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding (a) the technical report 
entitled “Technical Report, North Rolling Pin Property, Campbell County, Wyoming, U.S.A.” dated 
June 4, 2010, (b) the technical report entitled “Technical Report, West North Butte Satellite Properties, 
Campbell County, Wyoming, U.S.A.” dated December 9, 2008, and (c) the technical report entitled 
“Technical Report, Reno Creek Property, Campbell County, Wyoming, U.S.A.” dated October 13, 
2010, contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the 
“10-K”) of  Energy Fuels  Inc.  (the  “Company”) being  filed with the  United States Securities and 
Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

TREC, INC. 

/s/ Douglass H. Graves 
Name:  Douglass H. Graves 
Title: President 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF WOODY ENTERPRISES 

Exhibit 23.20 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Technical Report, West 
North  Butte  Satellite  Properties,  Campbell  County, Wyoming,  U.S.A.”  dated  December  9,  2008, 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) 
of Energy Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange 
Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

WOODY ENTERPRISES 

/s/ Don R. Woody 
Name: Don R. Woody 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF ALLAN MORAN 

Exhibit 23.21 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding the technical report entitled “NI 43-101 Technical 
Report on Resources Wate Uranium Breccia Pipe - Northern Arizona, USA” dated March 10, 
2015 (the “Technical Disclosure”), contained in the Annual Report  on Form 10-K for the 
period ended December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being 
filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), and 
any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Allan Moran 
Allan Moran 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 23.22 

CONSENT OF FRANK A. DAVIESS 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding the technical report entitled “NI 43-101 Technical 
Report on Resources Wate Uranium Breccia Pipe - Northern Arizona, USA” dated March 10, 
2015 (the “Technical Disclosure”), contained in the Annual Report  on Form 10-K for the 
period ended December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being 
filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), and 
any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Frank A. Daviess 
Frank A. Daviess 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 23.23 

CONSENT OF SRK CONSULTING (U.S.) INC. 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure regarding the technical report entitled “NI 43-101 Technical 
Report on Resources Wate Uranium Breccia Pipe - Northern Arizona, USA” dated March 10, 
2015 (the “Technical Disclosure”), contained in the Annual Report  on Form 10-K for the 
period ended December 31, 2017 (the “10-K”) of Energy Fuels Inc. (the “Company”) being 
filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), and 
any amendments thereto (the “S-8s”); and 

(iv) 

the use of our name in the 10-K, the S-3, and the S-8s. 

SRK CONSULTING (U.S.) INC. 

/s/ Corolla Hoag 
Name: Corolla Hoag 
Title: Practice Leader 

Date: March 9, 2018 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 23.24 

CONSENT OF CHRISTOPHER MORETON 

The undersigned hereby consents to: 

(i) 

(ii) 

(iii) 

the filing of the written disclosure (the “Technical Disclosure”) regarding the “Technical Report on 
the EZ1 and EZ2 Breccia Pipes, Arizona Strip District, U.S.A.” dated June 27, 2012, contained in 
the Annual Report on Form 10-K for the period ended December 31, 2017 (the “10-K”) of Energy 
Fuels Inc. (the “Company”) being filed with the United States Securities and Exchange Commission; 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s Form 
S-8  Registration  Statements  (File  Nos.  333-217098,  333-205182  and  333-194900),  and  any 
amendments thereto (the “S-8s”); and 

(v) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Christopher Moreton 
Christopher Moreton, P.E. 

Date: March 8, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF VALERIE WILSON 

The undersigned hereby consents to: 

(i) 

the filing of the written disclosure regarding the “Technical Report on the Canyon Mine, 
Coconino  County, Arizona,  USA”  dated  October  6,  2017  (the  “Technical  Disclosure”), 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the 
“10-K”) of Energy Fuels Inc. (the “Company”) being filed with the United States Securities 
and Exchange Commission; 

(ii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

(iii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

/s/ Valerie Wilson 
Valerie Wilson, M.Sc., P.Geo. 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CONSENT OF JEFFREY L. WOODS 

The undersigned hereby consents to: 

(i) 

the filing of the written disclosure regarding the “Technical Report on the Canyon Mine, 
Coconino  County, Arizona,  USA”  dated  October  6,  2017  (the  “Technical  Disclosure”), 
contained in the Annual Report on Form 10-K for the period ended December 31, 2017 (the 
“10-K”) of Energy Fuels Inc. (the “Company”) being filed with the United States Securities 
and Exchange Commission; 

(ii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-3 (File No. 333-210782), and any amendments thereto (the “S-3”); 

(iii) 

the incorporation by reference of such Technical Disclosure in the 10-K into the Company’s 
Form S-8 Registration Statements (File Nos. 333-217098, 333-205182 and 333-194900), 
and any amendments thereto (the “S-8s”); and 

(iv) 

the use of my name in the 10-K, the S-3, and the S-8s. 

Jeffrey L. Woods 
Jeffrey L. Woods, SME, QP MMSA 

Date: March 9, 2018 

RPA Inc. 55 University Ave. Suite 501 | Toronto, ON, Canada  M5J 2H7 | T +1 (416) 947 0907 

www.rpacan.com 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
KPMG LLP 
Chartered Accountants 
Bay Adelaide Centre 
Suite 4600 
333 Bay Street 
Toronto ON  M5H 2S5 

Telephone (416) 777-8500 
Fax (416) 777-8818 
www.kpmg.ca 

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM 

The Board of Directors 

Energy Fuels Inc. 

We consent to the incorporation by reference in the Registration Statement (No. 333-210782) on Form S-3 
and Registration Statements (No. 333-217098, 333-205182, 333-194900) on Form S-8 of Energy Fuels Inc. 
of our report dated March 8, 2017, with respect to the consolidated balance sheet of Energy Fuels Inc. as of 
December 31, 2016, and the related consolidated statements of operations and comprehensive loss, changes 
in equity and cash flows for each of the years in the two-year period ended December 31, 2016, which report 
appears in the December 31, 2017 Annual Report on Form 10-K of Energy Fuels Inc. 

/s/ KPMG LLP 

Chartered Professional Accountants, Licensed Public Accountants 
March 9, 2018 
Toronto, Canada 

KPMG LLP is a Canadian limited liability partnership and a member 
firm of the KPMG network of independent member firms affiliated with 
KPMG International Cooperative (“KPMG International”), a Swiss 
entity. KPMG Canada provides services to KPMG LLP. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CERTIFICATION OF CHIEF EXECUTIVE OFFICER 
PURSUANT TO RULE 13a-14(a) OF THE 
SECURITIES EXCHANGE ACT OF 1934 

I, Mark S. Chalmers, certify that: 

EXHIBIT 31.1 

1. 

2. 

3. 

4. 

I have reviewed this annual report on Form 10-K of Energy Fuels Inc.; 

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material 
fact necessary to make the statements made, in light of the circumstances under which such statements were made, not 
misleading with respect to the period covered by this report; 

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present 
in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the 
periods presented in this report; 

The registrant's other certifying officer and I are responsible for establishing and maintaining disclosure controls and 
procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting 
(as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: 

(a) 

(b) 

(c) 

(d) 

Designed such disclosure controls and procedures, or caused such disclosure controls and procedures 
to be designed under our supervision, to ensure that material information relating to the registrant, 
including its consolidated subsidiaries, is made known to us by others within those entities, particularly 
during the period in which this report is being prepared; 

Designed such internal control over financial reporting, or caused such internal control over financial 
reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability 
of financial reporting and the preparation of financial statements for external purposes in accordance 
with generally accepted accounting principles; 

Evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this 
report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end 
of the period covered by this report based on such evaluation; and 

Disclosed in this report any change in the registrant's internal control over financial reporting that 
occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the 
case of an annual report) that has materially affected, or is reasonably likely to materially affect, the 
registrant's internal control over financial reporting; and 

5. 

The registrant's other certifying officer and I have disclosed, based on our most recent evaluation of internal control 
over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or 
persons performing the equivalent functions): 

(a) 

(b) 

All significant deficiencies and material weaknesses in the design or operation of internal control over 
financial reporting which are reasonably likely to adversely affect the registrant's ability to record, 
process, summarize and report financial information; and 

Any  fraud,  whether  or  not  material,  that  involves  management  or  other  employees  who  have  a 
significant role in the registrant's internal control over financial reporting. 

Date: March 9, 2018 

/s/ Mark S. Chalmers 
Mark S. Chalmers 
Chief Executive Officer 
(Principal Executive Officer) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CERTIFICATION OF CHIEF FINANCIAL OFFICER 
PURSUANT TO RULE 13a-14(a) OF THE 
SECURITIES EXCHANGE ACT OF 1934 

I, David C. Frydenlund, certify that: 

EXHIBIT 31.2 

1. 

2. 

3. 

4. 

I have reviewed this annual report on Form 10-K of Energy Fuels Inc.; 

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material 
fact necessary to make the statements made, in light of the circumstances under which such statements were made, not 
misleading with respect to the period covered by this report; 

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present 
in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the 
periods presented in this report; 

The registrant's other certifying officer and I are responsible for establishing and maintaining disclosure controls and 
procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting 
(as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have: 

(a) 

(b) 

(c) 

(d) 

Designed such disclosure controls and procedures, or caused such disclosure controls and procedures 
to be designed under our supervision, to ensure that material information relating to the registrant, 
including its consolidated subsidiaries, is made known to us by others within those entities, particularly 
during the period in which this report is being prepared; 

Designed such internal control over financial reporting, or caused such internal control over financial 
reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability 
of financial reporting and the preparation of financial statements for external purposes in accordance 
with generally accepted accounting principles; 

Evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this 
report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end 
of the period covered by this report based on such evaluation; and 

Disclosed in this report any change in the registrant's internal control over financial reporting that 
occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the 
case of an annual report) that has materially affected, or is reasonably likely to materially affect, the 
registrant's internal control over financial reporting; and 

5. 

The registrant's other certifying officer and I have disclosed, based on our most recent evaluation of internal control 
over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or 
persons performing the equivalent functions): 

(a) 

(b) 

All significant deficiencies and material weaknesses in the design or operation of internal control over 
financial reporting which are reasonably likely to adversely affect the registrant's ability to record, 
process, summarize and report financial information; and 

Any  fraud,  whether  or  not  material,  that  involves  management  or  other  employees  who  have  a 
significant role in the registrant's internal control over financial reporting. 

Date: March 9, 2018 

/s/ David C. Frydenlund 
David C. Frydenlund 
Chief Financial Officer 
(Principal Financial Officer) 

 
 
 
 
 
 
 
 
 
CERTIFICATION PURSUANT TO 
18 U.S.C. §1350 
AS ADOPTED PURSUANT TO 
SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002 

EXHIBIT 32.1 

In  connection  with  the  Annual  Report  of  Energy  Fuels  Inc.  (the  "Company")  on  Form  10-K  for  the  period  ended 
December 31, 2017 as filed with the Securities and Exchange Commission on the date hereof (the "Report"), I, Mark S. Chalmers, 
Chief Executive Officer, certify, pursuant to 18 U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 
2002, that: 

(1)  The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as 

amended; and 

(2)  The information contained in the Report fairly presents, in all material respects, the financial condition and results of 

operations of the Company. 

/s/ Mark S. Chalmers 
Mark S. Chalmers 

Chief Executive Officer 

(Principal Executive Officer) 

Date: March 9, 2018 

A signed original of this written statement required by Section 906, or other document authenticating, acknowledging, or otherwise 
adopting the signature that appears in typed form within the electronic version of this written statement required by Section 906, 
has been provided to the Company and will be retained by the Company and furnished to the Securities and Exchange Commission 
or its staff upon request. 

 
 
 
 
 
CERTIFICATION PURSUANT TO 
18 U.S.C. §1350 
AS ADOPTED PURSUANT TO 
SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002 

EXHIBIT 32.2 

In  connection  with  the  Annual  Report  of  Energy  Fuels  Inc.  (the  "Company")  on  Form  10-K  for  the  period  ended 
December 31, 2017 as filed with the Securities and Exchange Commission on the date hereof (the "Report"), I, David C. Frydenlund, 
Chief Financial Officer, certify, pursuant to 18 U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 
2002, that: 

(1)  The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as 

amended; and 

(2)  The information contained in the Report fairly presents, in all material respects, the financial condition and results of 

operations of the Company. 

/s/ David C. Frydenlund 
David C. Frydenlund 
Chief Financial Officer 
(Principal Financial Officer) 

Date: March 9, 2018 

A signed original of this written statement required by Section 906, or other document authenticating, acknowledging, or otherwise 
adopting the signature that appears in typed form within the electronic version of this written statement required by Section 906, 
has been provided to the Company and will be retained by the Company and furnished to the Securities and Exchange Commission 
or its staff upon request. 

 
 
 
 
 
 
Mine Safety Disclosure 

Exhibit 95.1 

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the “Dodd-Frank 
Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States, and 
that is subject to regulation by the Federal Mine Safety and Health Administration under the Mine Safety and Health Act of 
1977 (“Mine Safety Act”), are required to disclose in their periodic reports filed with the SEC information regarding specified 
health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. 

The following table sets out the information concerning mine safety violations or other regulatory matters required by Section 
1503(a) of the Dodd Frank Wall Street Reform and Consumer Protection Act for the period January 1, 2017 through December 
31, 2017 covered by this report: 

Section 104 
(a) S&S 
Citations2
(#) 

Section 
104(b) 
  Orders3

Section 110 
(b)(2) 
Violations5
(#) 

Section 
107(a) 
  Orders6

Section 
104(d) 
Citations 
and 
Orders4
(#) 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

(#) 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Property 

Arizona 1 

Beaver/ 
La Sal1
Canyon 
Daneros1
Energy 
Queen1
Pandora1
Pinenut1
Rim1
Tony M1
Whirlwind1

Nil 

Nil 

4 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Total Dollar 
Value of 
MSHA 
Assess- 
ments 
Proposed7
($) 

$0.00 

$0.00 

$5,124.00 
$0.00 

$0.00 

$0.00 
$0.00 
$0.00 
$0.00 
$0.00 

Total 
Number of 
Mining 
Related 
Fatalities 
(#) 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Received 
Notice of 
Pattern of 
Violations 
Legal 
or Potential  Actions 

Thereof 
Under 
Section 104 
(e)8
(yes/no) 

Legal 
Pending  Actions 
as of Last 
Day of 
Period9
(#) 

Legal 
Actions 
Initiated  Resolved 
During 
During 
Period 
Period 
(#) 
(#) 

No 

No 

No 
No 

No 

No 
No 
No 
No 
No 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

(#) 

Nil 

Nil 

Nil 
Nil 

Nil 

Nil 
Nil 
Nil 
Nil 
Nil 

1.  The Company’s Arizona 1, Beaver/La Sal Property, Daneros Project, Energy Queen Property, Pandora Property, Pinenut, 

Rim Project, Tony M Property and Whirlwind Project were each on standby and were not mined during the period. 

2.  Citations and Orders are issued under Section 104 of the Federal Mine Safety and Health Act of 1977 (30 U.S.C. 814) (the 
“Act”) for violations of the Act or any mandatory health or safety standard, rule, order or regulation promulgated under the Act. 
A Section 104(a) “Significant and Substantial” or “S&S” citation is considered more severe than a non-S&S citation and generally 
is issued in a situation where the conditions created by the violation do not cause imminent danger, but the violation is of such 
a nature as could significantly and substantially contribute to the cause and effect of a mine safety or health hazard.  It should 
be noted that, for purposes of this table, S&S citations that are included in another column, such as Section 104(d) citations, 
are not also included as Section 104(a) S&S citations in this column. 

3.  A Section 104(b) withdrawal order is issued if, upon a follow up inspection, an MSHA inspector finds that a violation has not 
been abated within the period of time as originally fixed in the violation and determines that the period of time for the abatement 
should not be extended.  Under a withdrawal order, all persons, other than those required to abate the violation and certain others, 
are required to be withdrawn from and prohibited from entering the affected area of the mine until the inspector determines that 
the violation has been abated. 

4.  A citation is issued under Section 104(d) where there is an S&S violation and the inspector finds the violation to be caused by 
an unwarrantable failure of the operator to comply with a mandatory health or safety standard. Unwarrantable failure is a special 
negligence finding that is made by an MSHA inspector and that focuses on the operator’s conduct.  If during the same inspection 
or any subsequent inspection of the mine within 90 days after issuance of the citation, the MSHA inspector finds another violation 
caused by an unwarrantable failure of the operator to comply, a withdrawal order is issued, under which all persons, other than 
those required to abate the violation and certain others, are required to be withdrawn from and prohibited from entering the 
affected area until the inspector determines that the violation has been abated. 

5.  A flagrant violation under Section 110(b)(2) is a violation that results from a reckless or repeated failure to make reasonable 
efforts to eliminate a known violation of a mandatory health or safety standard that substantially and proximately caused, or 
reasonable could have been expected to cause, death or serious bodily injury. 

6.  An imminent danger order under Section 107(a) is issued when an MSHA inspector finds that an imminent danger exists in a 

mine.  An imminent danger is the existence of any condition or practice which could reasonably be expected to cause death or 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
serious physical harm before such condition or practice can be abated.  Under an imminent danger order, all persons, other than 
those required to abate the condition or practice and certain others, are required to be withdrawn from and are prohibited from 
entering the affected area until the inspector determines that such imminent danger and the conditions or practices which caused 
the imminent danger no longer exist. 

7.  These dollar amounts include the total amount of all proposed assessments from MSHA under the Act relating to any type of 
violation during the period, including proposed assessments for non-S&S citations that are not specifically identified in this 
exhibit, regardless of whether the Company has challenged or appealed the assessment. 

8.  A Notice is given under Section 104(e) if an operator has a pattern of S&S violations.  If upon any inspection of the mine within 
90 days after issuance of the notice, or at any time after a withdrawal notice has been given under Section 104(e), an MSHA 
inspector finds another S&S violation, an order is issued, under which all persons, other than those required to abate the violation 
and certain others, are required to be withdrawn from and prohibited from entering the affected area until the inspector determines 
that the violation has been abated. 

9.  There were no legal actions pending before the Federal Mine Safety and Health Review Commission as of the last day of the 
period covered by this report.  In addition, there were no pending actions that are (a) contests of citations and orders referenced 
in Subpart B of 29 CFR Part 2700; (b) complaints for compensation referenced in subpart D of 29 CFR Part 2700; (c) complaints 
of discharge, discrimination or interference referenced in Subpart E of 29 CFR Part 2700; (d) applications for temporary relief 
referenced in Subpart F of 29 CFR Part 2700; or (e) appeals of judges’ decisions or orders to the Federal Mine Safety and Health 
Review Commission referenced in Subpart H of 29 CFR Part 2700.