Quarterlytics / Basic Materials / Gold / Gold Resource Corporation

Gold Resource Corporation

goro · AMEX Basic Materials
Claim this profile
Ticker goro
Exchange AMEX
Sector Basic Materials
Industry Gold
Employees 480
← All annual reports
FY2017 Annual Report · Gold Resource Corporation
Sign in to download
Loading PDF…
Gold Resource Corporation
NYSE American: GORO

2017 ANNUAL REPORT

SEVEN CONSECUTIVE YEARS OF PROFITABILITY

Dear Fellow Shareholders,

2017 marked Gold Resource Corporation’s seventh consecutive year of profitability 
and organic growth as a mining company.  To say that I am proud of our seven 
consecutive years of financial success, proud of our dedicated team of professionals 
and proud of all the achievements we accomplished as a team during the year 
would be an understatement.  The business of mining is not only important and 
exciting work, but challenging as well.  In addition to these achievements, 2017 
saw us rise to meet many challenges with success which included: 

• $110 million net sales
• $4.2 million net income, or $0.07 per share
• $75 total cash cost per precious metal gold equivalent ounce sold
• $590 all-in sustaining cash cost per ounce (“AISC”)
• $8.2 million cash increase to $22.4 million
• Achieved annual targets producing 28,117 gold ounces and 1,773,263 silver ounces
• 52,050 precious metal gold equivalent ounces produced (74.1:1 realized silver-to-gold ratio)
• 47,224 precious metal gold equivalent ounces sold
• 1,141 tonnes copper, 5,365 tonnes lead and 16,301 tonnes zinc produced
• $3.8 million physical gold and silver bullion treasury
• $1.1 million annual dividends paid, or $0.02 per share
• $110 million total dividends paid over 89 consecutive monthly distributions
• Acquired 5,300-acre East Camp Douglas property, Mineral County, Nevada
• Expanded Isabella Pearl Project to over 9,000 acres by acquiring additional 153 mining claims
• Acquired long lead-time capital equipment for Isabella Pearl Project, including crusher, radial
   stackers and conveyors, and commissioned “ADR” plant construction
• Extended strike length of Switchback vein system by 325 meters to 625 meters
• Completed full year of mine development at Switchback prior to initiating bulk tonnage mining
• Targeting +100% increase of our gold production profile after commencement of Isabella Pearl Project

Our Oaxaca Mining Unit delivered another great year of low cost precious metal production, solid 
advancements in our mine development at both the Arista and Mirador mines and added another year of 
profitability to our record.  We accomplished this while continuing to position our Nevada Mining Unit 
for future gold production from our Isabella Pearl Project by taking delivery of long lead time equipment, 
optimizing mine schedules and mine plans and advancing to the final permitting phase as we await final 
permission to commence mine construction and development.  

We remain focused on current production efforts in Mexico while preparing for future Nevada 
development and production that targets to more than double our gold production profile.  As we look 
ahead in 2018 and beyond, we have a clear vision of Gold Resource Corporation as a diversified, low-cost 
precious metal producer, explorer and dividend payer with a shareholder-friendly philosophy.  I want 
to personally thank you for your support as a fellow shareholder in Gold Resource Corporation and am 
excited about the future of our growing company.  The Board of Directors, management and team here at 
Gold Resource Corporation remain committed to you as a shareholder 
and again thank you for your continued support. 

Sincerely, 

Jason Reid
CEO & President

 
 
UNITED STATES 
SECURITIES AND EXCHANGE COMMISSION 
Washington, D.C. 20549  

FORM 10-K 

(Mark One) 
 

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934  

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934  

For the fiscal year ended December 31, 2017 

For the transition period from              to               

Commission File Number: 001-34857 

Gold Resource Corporation 
(Exact name of registrant as specified in its charter) 

Colorado 
(State or other jurisdiction of 
incorporation or organization) 

84-1473173 
(I.R.S. Employer 
Identification No.) 

2886 Carriage Manor Point, Colorado Springs, Colorado 80906  
(Address of Principal Executive Offices) (Zip Code)  

(303) 320-7708 
(Registrant’s telephone number including area code)   

Securities registered under Section 12(b) of the Exchange Act: 

Title of each class 
Common Stock, $0.001 par value 

Name of each exchange on which registered 
NYSE American 

Securities registered under Section 12(g) of the Exchange Act:  
None 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.     Yes       No    

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.     Yes       No    

Indicate by check mark whether the registrant (1) filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such 
shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.     Yes        No    

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to 
Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to post such files).     Yes        No    

Indicate by checkmark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§229.405 of this chapter) is not contained herein, and will not be contained, to the best of registrant’s 
knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.     

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See definition of 
“large accelerated filer,” “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act. 

Larger accelerated filer 
Non-accelerated filer 

 
 (Do not check if a smaller reporting company) 

Accelerated filer 
Smaller reporting company 

Emerging growth company 

 
 

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards 
   
provided pursuant to Section 13(a) of the Exchange Act 

Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes  No   

The aggregate market value of the common stock of Gold Resource Corporation held by non-affiliates as of June 30, 2017, the last business day of the registrant’s most recently completed second 
fiscal quarter, was $223,772,333 based on the closing price of the common stock of $4.08 as reported on the NYSE American.  

As of March 7, 2018, there were 57,107,884 shares of the registrant’s common stock outstanding.  

Portions of the Definitive Proxy Statement to be filed pursuant to Regulation 14A for the registrant’s 2018 annual meeting of shareholders are incorporated by reference into Part III of this Form 10-
K.  

DOCUMENTS INCORPORATED BY REFERENCE: 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TABLE OF CONTENTS 

PART I 

ITEM 1: 
ITEM 1A: 
ITEM 1B: 
ITEM 2: 
ITEM 3: 
ITEM 4: 

BUSINESS 
RISK FACTORS 
UNRESOLVED STAFF COMMENTS 
PROPERTIES 
LEGAL PROCEEDINGS 
MINE SAFETY DISCLOSURES 

PART II 

ITEM 5: 

ITEM 6: 
ITEM 7: 

ITEM 7A: 
ITEM 8: 
ITEM 9: 

ITEM 9A: 
ITEM 9B: 

ITEM 10: 
ITEM 11: 
ITEM 12: 

ITEM 13: 

ITEM 14: 

MARKET FOR COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND 
PURCHASES OF EQUITY SECURITIES 
SELECTED FINANCIAL DATA 
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND 
RESULTS OF OPERATIONS 
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 
FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA 
CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND 
FINANCIAL DISCLOSURE 
CONTROLS AND PROCEDURES 
OTHER INFORMATION 

PART III 

DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERNANCE 
EXECUTIVE COMPENSATION 
SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT 
AND RELATED STOCKHOLDER MATTERS 
CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR 
INDEPENDENCE 
PRINCIPAL ACCOUNTING FEES AND SERVICES 

ITEM 15: 
ITEM 16: 

EXHIBITS, FINANCIAL STATEMENT SCHEDULES 
FORM 10-K SUMMARY 
SIGNATURES 

PART IV 

  Page 

4 
7 
17 
17 
31 
31 

32 
35 

36 
46 
48 

77 
77 
78 

78 
78 

78 

78 
78 

79 
80 
81 

2 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ADDITIONAL INFORMATION 

Descriptions of agreements or other documents contained in this report are intended as summaries and are not 
necessarily complete. Please refer to the agreements or other documents filed or incorporated herein by reference as 
exhibits. Please see the exhibit index at the end of this report for a complete list of those exhibits. 

SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS  

This report contains forward-looking statements that involve risks and uncertainties. The statements contained in 

this report that are not purely historical are forward-looking statements within the meaning of Section 27A of the 
Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. When used in this report, the words 
“plan,” “target,” “anticipate,” “believe,” “estimate,” “intend”, “expect” and similar expressions are intended to identify 
such forward-looking statements. Such forward-looking statements include, without limitation, the statements regarding 
Gold Resource Corporation’s strategy, future plans for production, future expenses and costs, future liquidity and capital 
resources, future dividends and estimates of mineralized material. All forward-looking statements in this report are based 
upon information available to Gold Resource Corporation on the date of filing this report, and the company assumes no 
obligation to update any such forward-looking statements. Forward looking statements involve a number of risks and 
uncertainties and there can be no assurance that such statements will prove to be accurate. Gold Resource Corporation’s 
actual results could differ materially from those discussed in this report. Factors that could cause or contribute to such 
differences include, but are not limited to, those discussed in the Item 1A. Risk Factors section of this report. 

In addition to the specific factors identified under Item 1A. Risk Factors in this report, other uncertainties that 

could affect the accuracy of forward-looking statements include:  

•  Commodity price fluctuations;  
•  Mine protests and work stoppages; 
•  Rock formations, faults and fractures, water flow and possible CO2 gas exhalation or other unanticipated 

geological situations; 

•  Decisions of foreign countries and banks within those countries; 
•  Unexpected changes in business and economic conditions, including the rate of inflation;  
•  Changes in interest rates and currency exchange rates;  
•  Timing and amount of production;  
•  Technological changes in the mining industry;  
•  Our costs;  
•  Access to and availability of materials, equipment, supplies, labor and supervision, power and water;  
•  Results of current and future feasibility studies;  
•  The level of demand for our products;  
•  Changes in our business strategy, plans and goals;  
• 
•  Litigation by private parties or regulatory action by governmental entities;  
•  Acts of God such as floods, earthquakes and any other natural disasters; and 
•  The uncertainty of mineralized material estimates and timing of mine construction expenditures. 

Interpretation of drill hole results and the geology, grade and continuity of mineralization;  

This list, together with the factors identified under Item 1A. Risk Factors, is not exhaustive of the factors that 
may affect any of our forward-looking statements. You should read this report completely and with the understanding 
that our actual future results may be materially different from what we expect. These forward-looking statements 
represent our beliefs, expectations and opinions only as of the date of filing this report. We do not intend to update these 
forward-looking statements except as required by law. We qualify all of our forward-looking statements by these 
cautionary statements. 

3 

 
 
 
 
 
 
 
 
 
ITEM 1.        BUSINESS 

History and Organization 

PART I 

Gold Resource Corporation was organized under the laws of the State of Colorado on August 24, 1998. We are a 
producer of metal concentrates that contain gold, silver, copper, lead and zinc, and doré containing gold and silver from 
the Aguila and Alta Gracia Projects in the southern state of Oaxaca, Mexico (“Oaxaca Mining Unit”). The Aguila Project 
includes the Arista underground mine and processing facility, which are currently in operation. The Alta Gracia Project 
includes the Mirador underground mine which began operations in 2017.  We also perform exploration and evaluation 
work on our portfolio of precious and base metal exploration properties in Nevada, United States of America (“Nevada 
Mining Unit”) and continue to evaluate other properties for possible acquisition. 

In this report, “Company,” “our,” “us” and “we” refer to Gold Resource Corporation together with our 

subsidiaries, unless the context otherwise requires.  See glossary on page 30 for additional definitions. 

The majority of our assets are located at our Oaxaca Mining Unit, including our Aguila processing facility, and 
Arista and Mirador underground mines. The Aguila processing facility produces metal concentrates and doré from ore 
mined from both the Arista and Mirador Mines. All of our production and revenue currently comes from our Oaxaca 
Mining Unit.  

The Aguila and Alta Gracia Projects, which comprise our only operating properties, include a total of 
approximately 35,390 hectares of mining concessions, access roads from a major highway, haul roads, a processing 
facility, and adjoining buildings, an assay lab, an open pit and underground mines, tailings facilities and other 
infrastructure. Please see Item 2. Properties for maps and additional information. 

We commenced mining and milling operations from the Aguila Project in July 2010, initially from the Aguila 

open pit mine, followed by development and mining the Arista underground mine.  The Arista Mine was expanded in 
2016 with the development of the Switchback vein system.  The Arista underground mine is located approximately two 
kilometers from the processing facility.  Most of the production from our Oaxaca Mining Unit from 2011 to present has 
been from the Arista Mine. 

We first reported Proven and Probable (“P&P”) reserves for our Arista Mine in 2014.  In 2016, we expanded 
Arista Mine’s P&P reserves with the addition of the Switchback vein system.  In February 2017, we announced our first 
proven and probable reserves for our Mirador Mine.  In 2017, development of the Mirador Mine advanced to a point 
which allowed for consistent ore feed to the Aguila processing facility.  Please see Item 2. Properties, Proven and 
Probable Reserves for more information.  

Our operations in Oaxaca are conducted through our Mexican subsidiary, Don David Gold Mexico S.A. de C.V. 
(“DDGM”). Our Nevada exploration and evaluation work is performed through two wholly-owned subsidiaries, GRC 
Nevada Inc. and Walker Lane Minerals Corp. (“Walker Lane”). 

Our principal executive offices are located at 2886 Carriage Manor Point, Colorado Springs, Colorado 80906, and 

our telephone number is (303) 320-7708. We maintain a website at www.goldresourcecorp.com and through a link on 
our website you can view the periodic filings that we make with the U.S. Securities and Exchange Commission (“SEC”), 
as well as certain of our corporate governance documents such as our code of ethics.  

Segment Information 

Our segments are broken into two geographic regions. The geographic regions include Oaxaca, Mexico 
(“Mexico”) and Nevada, U.S.A. (“Nevada”) and represent the Company’s operating segments.  Please see Note 21 in 
Item 8. Financial Statements and Supplementary Data for additional information. 

4 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Developments in 2017 

For the year ended December 31, 2017, we reported revenue of $110.2 million, mine gross profit of $42.1 million 

and net income of $4.2 million. Substantially all of our 2017 revenue was from the Arista Mine in Mexico. Our annual 
2017 mill production totaled 28,117 gold ounces, 1,773,263 silver ounces, 1,141 copper tonnes, 5,365 lead tonnes and 
16,301 zinc tonnes. In 2017, dividends distributed to shareholders totaled $0.02 per share or $1.1 million. 

Oaxaca Mining Unit  

During 2017, we continued to develop the Arista underground mine, including the Switchback vein system.  
Development of the Switchback vein system in 2017 reached the point that allows for bulk tonnage mining techniques 
planned in 2018.   

In addition to the Arista underground mine, we advanced development of the Mirador Mine in 2017 and began 

delivering a limited amount of development ore to the Aguila processing facility in the second quarter.   

Nevada Mining Unit 

During 2017, we acquired the highly prospective East Camp Douglas exploration property, and added a significant 
number of additional claims to the Isabella Pearl Project.  In addition, we continued to advance the permitting process for 
our Isabella Pearl Project.   

Dividends  

Since July 2010, we have paid a monthly dividend. During 2017, we paid one-sixth cent per share per month, 

which totaled $0.02 per share per year. Please see Item 5. Market for Registrant’s Common Equity, Related 
Stockholder Matters and Issuer Purchase of Equity Securities for additional information. 

Condition of Physical Assets and Insurance 

Our business is capital intensive and requires ongoing investment for the replacement, modernization or expansion 

of equipment and facilities. For more information, please see Item 7. Management’s Discussion and Analysis of 
Financial Condition and Results of Operations, Liquidity and Capital Resources, below. We maintain insurance 
policies against property loss and business interruption and insure against risks that are typical in the operation of our 
business in amounts that we believe to be reasonable. Such insurance, however, contains exclusions and limitations on 
coverage, particularly with respect to property loss, environmental liability and political risk. There can be no assurance 
that claims would be paid under such insurance policies in connection with a particular event. Please see Item 1A. Risk 
Factors, below for additional information. 

Environmental Matters  

We conduct our operations so as to protect the environment and believe our operations are in compliance with 
applicable laws and regulations in all material respects. Our operating mines have reclamation plans in place that we 
believe meet all applicable legal and regulatory requirements. At December 31, 2017, $2.9 million was accrued on our 
consolidated balance sheet for reclamation costs relating to operating properties. 

5 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Competitive Business Conditions 

The exploration for, and the acquisition of, gold and silver properties are subject to intense competition. 
Identifying and evaluating potential mining prospects is a costly and time-consuming endeavor. Due to our limited 
capital and personnel, we are at a competitive disadvantage compared to many other companies with regard to 
exploration and, if warranted, advancement of mining properties. Our present limited capital means that our ability to 
compete for properties to be explored and developed is limited. We believe that competition for acquiring mineral 
prospects will continue to be intense in the future. 

Government Regulations and Permits  

In connection with mining, milling and exploration activities, we are subject to United States and Mexican federal, 
state and local laws and regulations governing the protection of the environment, including laws and regulations relating 
to protection of air and water quality, hazardous waste management and mine reclamation as well as the protection of 
endangered or threatened species. The department responsible for environmental protection in Mexico is Secretaria de 
Medio Ambiente y Recursos Naturales (“SEMARNAT”), which is similar to the United States Environmental Protection 
Agency. SEMARNAT has broad authority to shut down and/or levy fines against facilities that do not comply with its 
environmental regulations or standards. Potential areas of environmental consideration for mining companies, including 
ours, include but are not limited to, acid rock drainage, cyanide containment and handling, contamination of water 
sources, dust and noise. The agencies responsible for environmental protections and permitting in our Nevada Mining 
Unit include the Bureau of Land Management (“BLM”) and the Nevada Division of Environmental Protection 
(“NDEP”). 

For operations at our Oaxaca Mining Unit, we have secured and continue to secure various regulatory permits 

from federal, state and local agencies. These governmental and regulatory permits generally govern the processes being 
used to operate, the stipulations concerning air quality and water issues, and the plans and obligations for reclamation of 
the properties at the conclusion of operations. We have received the required local community support for the Aguila and 
Alta Gracia Projects in the area where we are currently producing.  

We are actively seeking the permits necessary to place our Nevada Mining Unit’s Isabella Pearl Project into 
production.  Please see Item 2. Properties – Nevada Mining Unit, for more information on the status of our permitting 
efforts.  In connection with these permits and exploration activities in Nevada, we are subject to various federal, state and 
local laws and regulations governing protection of the environment, including, but not limited to, the Clean Air Act; the 
Clean Water Act; the Comprehensive Environmental Response, Compensation and Liability Act; the Emergency 
Planning and Community Right-to-Know Act; the Endangered Species Act; the Federal Land Policy and Management 
Act; the National Environmental Policy Act; the Resource Conservation and Recovery Act; and related state laws. These 
laws and regulations are continually changing and are generally becoming more restrictive.  

Customers 

During the year ended December 31, 2017, one customer accounted for 95% of our revenue in our Oaxaca Mining 
Unit.  In the event that our relationship with the customer is interrupted for any reason, we believe that we would be able 
to locate another entity to purchase our products. However, any interruption could temporarily disrupt the sale of our 
principal products and adversely affect our operating results. We periodically review our options for alternative sales 
outlets to mitigate the concentration of risk in case of any unforeseen disruptions. 

Employees and Contractors 

We currently have sixteen full-time employees, six of which serve as our executive officers. These individuals 

devote all of their business time to our affairs.  

We contract for the services of approximately 490 individuals employed by a third party and also use various 

independent contractors for underground mining, surface exploration drilling and trucking.  

6 

 
 
 
 
 
 
 
 
 
 
 
 
ITEM 1A.  RISK FACTORS 

This report, including Management’s Discussion and Analysis of Financial Condition and Results of Operations, 

contains forward-looking statements that may be materially affected by several risk factors, including those summarized below:  

Risks Relating to Our Company  

Our results of operations, cash flows and the value of our properties are highly dependent on the market prices 

of gold and silver and certain base metals and these prices can be volatile.  The profitability of our gold and silver 
mining operations and the value of our mining properties, are directly related to the market price of gold and silver, and 
to a lesser extent, copper, lead and zinc. The price of gold and silver may also have a significant influence on the market 
price of our common stock. The market price of gold and silver historically has fluctuated significantly and is affected by 
numerous factors beyond our control. These factors include supply and demand fundamentals, global or national political 
or economic conditions, expectations with respect to the rate of inflation, the relative strength of the U.S. dollar and other 
currencies, interest rates, gold and silver sales and loans by central banks, forward sales by metal producers, 
accumulation and divestiture by exchange traded funds, and a number of other factors.  

We derive a significant portion of our revenue from the sale of gold and silver and our results of operations will 
fluctuate as the prices of these metals change.  A period of significant and sustained lower gold and silver prices would 
materially and adversely affect our results of operations and cash flows. The volatility of mineral prices represents a 
substantial risk which no amount of planning or technical expertise can fully eliminate. In the event mineral prices 
decline or remain low for prolonged periods of time, we might be unable to develop our existing exploration properties, 
which may adversely affect our results of operations, financial performance and cash flows. An asset impairment charge 
may result from the occurrence of unexpected adverse events that impact our estimates of expected cash flows generated 
from our producing properties or the market value of our non-producing properties, including a material diminution in 
the price of gold and/or silver.  

During 2017, the price of gold and silver, as measured by the London P.M. fix, fluctuated from a low of $1,151 per 

ounce to a high of $1,346 per ounce while the price of silver fluctuated from a low of $15.22 per ounce to a high of 
$18.56 per ounce. As of March 7, 2018, gold and silver prices were $1,329 per ounce and $16,65 per ounce, respectively. 
The volatility in gold and silver prices is illustrated by the following table, which sets forth for each of the past five 
calendar years, the high, low, and average annual market prices in U.S. dollars per ounce of gold and silver based on the 
daily London P.M. fix: 

Gold: 

High 
Low  
Average 

Silver: 

High 
Low  
Average 

      2013        2014        2015        2016        2017   

  $  1,694   $  1,385   $  1,297   $  1,366   $  1,346  
  $  1,192   $  1,142   $  1,049   $  1,077   $  1,151  
  $  1,411   $  1,266   $  1,160   $  1,251   $  1,257  

  $  32.23   $  22.05   $  18.23   $  20.71   $  18.56  
  $  18.61   $  15.28   $  13.71   $  13.58   $  15.22  
  $  23.79   $  19.08   $  15.68   $  17.14   $  17.04  

Most of our production is limited to a single mine and any interruptions or stoppages in our mining activities 
would adversely affect our revenue. We are presently relying on revenues from a single mine to fund our operations. 
Any interruption in our ability to mine this location, such as a labor strike, natural disaster, or loss of permits would 
negatively impact our ability to collect revenue following such interruption. Additionally, if we are unable to 
economically develop additional mines, we will eventually deplete the body of mineralized material and will no longer 
generate revenue sufficient to fund our operations. A decrease in, or cessation of, our mining operations would adversely 
affect our financial performance and may eventually cause us to cease operations. 

7 

 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
   
 
   
 
   
 
 
   
 
   
 
   
 
   
 
   
 
 
 
If we are unable to achieve anticipated gold and silver production levels, our financial condition and results of 

operations will be adversely affected. We have proceeded with the processing of the mineralized material from the 
Arista and Mirador underground mines at the Aguila and Alta Gracia Projects, respectively, based on estimates of 
mineralized material identified during exploration and in our Proven and Probable Reserve report. However, risks related 
to metallurgy are inherent when working with extractable minerals. Sales of gold and silver that we realize from future 
mining activity will be less than anticipated if the mined material does not contain the concentration of gold and silver 
predicted by our geological exploration, studies and reports. If sales of gold and silver are less than anticipated, we may 
not be able to recover our investment in our property and our operations may be adversely affected. Our inability to 
realize production based on quarterly or annual projections may also adversely affect the price of our common stock and 
you may lose part or all of your investment.  

Estimates of proven and probable reserves and mineralized material are uncertain and the volume and grade of 
ore actually recovered may vary from our estimates. The proven and probable reserves stated in this report represent the 
amount of gold, silver, copper, lead and zinc that we estimated, at December 31, 2017 could be economically and legally 
extracted or produced at the time of the reserve determination. Estimates of proven and probable reserves and 
mineralized material are subject to considerable uncertainty. Such estimates are, to a large extent, based on the prices of 
gold, silver, copper, lead and zinc and interpretations of geologic data obtained from drill holes and other exploration 
techniques. These prices and interpretations are subject to change.  If we determine that certain of our estimated reserves 
or mineralized material have become uneconomic, we may be forced to reduce our estimates.  Actual production may be 
significantly less than we expect. 

Any material changes in mineral estimates and grades of mineralization may affect the economic viability of 

placing a property into production and such property’s return on capital. There can be no assurance that minerals 
recovered in small scale tests will be recovered in large-scale tests under on-site conditions or in production scale. 
Extended declines in market prices for gold and/or silver may render portions of our mineralization estimates 
uneconomic and result in reduced reported mineralization or adversely affect the commercial viability of one or more of 
our properties. Any material reductions in estimates of mineralization, or of our ability to extract this mineralization, 
could have a material adverse effect on our results of operations or financial condition. 

Additionally, the term “mineralized material” as used in this report does not indicate proven and probable reserves 
as defined by Industry Guide 7 (“Guide 7”) promulgated by the SEC or our standards. Estimates of mineralized material 
are subject to further exploration and development and are therefore subject to considerable uncertainty. We cannot be 
certain that any part or parts of the mineralized material deposit will ever be confirmed or converted into Guide 7 
compliant reserves or that mineralized material can be economically or legally extracted. 

Our current property portfolio is limited to two producing properties and our ability to remain profitable over 

the long-term will depend on our ability to expand the known deposits like Arista and Mirador, and /or identify, 
explore and develop additional properties in Mexico and Nevada. Gold and silver producers must continually replace 
reserves depleted by production to maintain production levels over the long term and provide a return on invested 
capital. Depleted reserves can be replaced in several ways, including expanding known ore bodies, locating new 
deposits, or acquiring interests in reserves from third parties. Exploration is highly speculative in nature, capital 
intensive, involves many risks and is frequently unproductive. Our current or future exploration programs may not result 
in new mineral producing operations. Even if significant mineralization is discovered, it will likely take many years from 
the initial phases of exploration until commencement of production, during which time the economic feasibility of 
production may change. 

From time to time, we may acquire mineral interests from other parties. Such acquisitions are based on an analysis 

of a variety of factors including historical exploration results, estimates of and assumptions regarding the extent of ore 
reserves, the timing of production from such reserves and cash and other operating costs. In addition, we may rely on 
data and reports prepared by third parties (including the ability to permit and compliance with existing regulations) and 
which may contain information or data that we are unable to independently verify or confirm. All of these factors are 

8 

 
 
 
 
 
 
 
uncertain and may have an impact on our ability to develop the properties, as well as contributing to the uncertainties 
related to the process used to estimate ore reserves. 

As a result of these uncertainties, our exploration programs and any acquisitions which we may pursue may not 

result in the expansion or replacement of our current production with new ore reserves or operations, which could have a 
material adverse effect on our business, prospects, results of operations and financial position. 

We may not continue to be profitable. During the fiscal years ended December 31, 2017, 2016 and 2015, we 
reported net income of $4.2 million, $4.4 million and $3.1 million, respectively. We have accumulated retained earnings 
of $4.5 million as of December 31, 2017. The metal prices in recent years have had a significant impact on our profit 
margin and there is no assurance that we will be profitable in the future. Unexpected interruptions in our mining business 
may cause us to incur losses, or the revenue that we generate from production may not be sufficient to fund continuing 
operations including exploration and mine construction costs. Our failure to generate future profits may adversely affect 
the price of our common stock and you may lose all or part of your investment. 

We may require significant additional capital to fund our business plans. We may be required to expend 
significant funds to determine if mineralized material and proven and probable mineral reserves exist at any of our non-
producing properties, to continue exploration, and if warranted, develop our existing properties and to identify and 
acquire additional properties to diversify our property portfolio.  If we receive the necessary permits and make a positive 
development decision, we will require significant additional capital to bring the project into production. We have spent, 
and may be required to continue to expend, significant amounts of capital for drilling, geological and geochemical 
analysis, assaying, feasibility studies, mine development, and process equipment in connection with our exploration, 
development, and production activities. We may not benefit from these investments if we are unable to identify 
commercially exploitable mineralized material. 

Our ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including 

our historical and prospective results of operations, the status of the national and worldwide economy, the price of gold, 
silver and other valuable metals, the condition of the debt and equity markets, and the costs associated with extracting 
minerals. We may not be successful in generating or obtaining the required financing, or if we can obtain such financing, 
such financing may not be on terms that are favorable to us. Failure to obtain such additional financing could result in 
delay or indefinite postponement of further mining operations or exploration and construction and the possible partial or 
total loss of our interest in our properties.  

If we do not hedge our exposure to reductions in gold and silver prices, we may be subject to significant 
reductions in price. We do not use hedging transactions with respect to any of our gold and silver production and we do 
not expect to do so in the future.  Accordingly, we may be fully exposed to price fluctuations if gold and/or silver prices 
decline. While the use of hedging transactions limits the downside risk of price declines, their use also may limit future 
revenues from price increases. Hedging transactions also involve the risk that the counterparty may be unable to satisfy 
its obligations. 

Revenue from the sale of metal concentrate may be adversely affected by loss or damage during shipment and 
storage at our buyer’s facilities. We rely on third-party transportation companies to transport our metal concentrate to 
the buyer’s facilities for processing and further refining. The terms of our sales contracts with the buyers require us to 
rely on assay results from samples of our metal concentrate that are obtained at the buyer’s warehouse to determine the 
final sales value for our metals. Once the metal concentrate leaves our processing facility, we no longer have direct 
custody and control of these products. Theft, loss, automobile accidents, improper storage, fire, natural disasters, 
tampering or other unexpected events while in transit or at the buyer’s location may lead to the loss of all or a portion of 
our metal concentrate products. Such losses may not be covered by insurance and may lead to a delay or interruption in 
our revenue and our operating results may be adversely affected.  

9 

 
 
 
 
 
 
 
 
 
Exploration and, if deemed feasible, development of mineral properties is inherently risky and could lead to 
unproductive properties and/or capital investments. Our long-term success depends on our ability to identify additional 
mineral deposits on our properties and any other properties that we may acquire and to develop one or more of those 
properties into commercially viable mining operations. Mineral exploration is highly speculative in nature, involves 
many risks and is frequently unproductive. These risks include unusual or unexpected geologic formations and the 
inability to obtain suitable or adequate machinery, equipment or labor. The success of gold exploration is determined in 
part by the following factors:  

•  The identification of potential gold mineralization based on surface and drill analysis; 
•  Availability of government-granted exploration and construction permits; 
•  The quality of our management and our geological and technical expertise; and 
•  The capital available for exploration and development. 

Substantial expenditures are required to establish proven and probable reserves through detailed drilling and 

analysis, to develop metallurgical processes to extract metal and to develop the mining and processing facilities and 
infrastructure at any site chosen for mining. Whether a mineral deposit will be commercially viable depends on a number 
of factors, which include, without limitation, the particular attributes of the deposit, such as size, grade, metallurgy, rock 
competency and proximity to infrastructure like power, water and roads; metal prices, which fluctuate widely; and 
government regulations, including, without limitation, regulations relating to prices, taxes, royalties, land tenure, land 
use, importing and exporting of minerals, environmental protection and local and community support. We may invest 
significant capital and resources in exploration activities and abandon such investments if we are unable to identify 
commercially exploitable mineral reserves. The decision to abandon a project may have an adverse effect on the market 
value of our securities and our ability to raise future financing. 

We may acquire additional exploration stage properties and our business may be negatively impacted if reserves 

are not located on acquired properties. We have in the past and may in the future acquire additional exploration stage 
properties. There can be no assurance that reserves will be identified on any properties that we acquire. We may also 
experience negative reactions from the financial markets if we successfully complete acquisitions of additional properties 
and reserves are not located on acquired properties. These factors may adversely affect the trading price of our common 
stock or our financial condition or results of operations. 

To the extent that we seek to expand our operations and increase our reserves through acquisitions, we may 

experience issues in executing acquisitions or integrating acquired operations.  From time to time, we examine 
opportunities to make selective acquisitions in order to provide increased returns to our shareholders and to expand our 
operations and reported reserves and, potentially, generate synergies. The success of any acquisition would depend on a 
number of factors, including, but not limited to: 

• 
• 
• 

• 

Identifying suitable candidates for acquisition and negotiating acceptable terms; 
Obtaining approval from regulatory authorities and potentially our shareholders; 
Implementing our standards, controls, procedures and policies at the acquired business and addressing any 
pre-existing liabilities or claims involving the acquired business; and 
To the extent the acquired operations are in a country in which we have not operated historically, 
understanding the regulations and challenges of operating in that new jurisdiction. 

There can be no assurance that we will be able to conclude any acquisitions successfully, or that any acquisition 
will achieve the anticipated synergies or other positive results. Any material problems that we encounter in connection 
with such an acquisition could have a material adverse effect on our business, results of operations and financial position. 

10 

 
 
 
 
 
 
 
 
 
We rely on contractors to conduct a significant portion of our operations and construction projects.  A 

significant portion of our okperations and construction projects are currently conducted in whole or in part by 
contractors.  As a result, our operations are subject to a number of risks, some of which are outside our control, 
including: 

• 

• 
• 
• 

• 

• 

The difficulty and inherent delay in replacing a contractor and its operating equipment in the event that either 
party terminates the agreement; 
Reduced control and oversight over those aspects of operations which are the responsibility of the contractor; 
Failure of a contractor to perform under its agreement; 
Interruption of operations or increased costs in the event that a contractor ceases its business due to 
insolvency or other unforeseen events; 
Failure of a contractor to comply with applicable legal and regulatory requirements, to the extent it is 
responsible for such compliance; and 
Problems of a contractor with managing its workforce, labor unrest or other related employment issues. 

In addition, we may incur liability to third parties as a result of the actions of our contractors. The occurrence of 

one or more of these risks could adversely affect our results of operations and financial position. 

Our profits are subject to two mining duties imposed by the Mexican government. The Mexican government 
requires mineral producers to pay a ‘special’ mining duty to the government of 7.5% on net profits and an additional 
‘extraordinary’ mining duty of 0.5% on gross sales of precious metals of gold, silver and platinum. This legislation has 
and may in the future significantly and adversely affect our results of operations, including our cash flows, which may in 
turn affect the amount of capital we have available for typical uses of cash, including but not limited to, reinvestment 
into our business, funding new projects and paying dividends to our shareholders.  

The facilities and development of our underground mine and operations are subject to all of the risks inherent 

in development and operations. These risks include potential delays, cost overruns, shortages of material or labor, 
construction defects, breakdowns and injuries to persons and property. We expect to engage subcontractors and material 
suppliers in connection with the continued mine activities at the Aguila and Alta Gracia Projects. While we anticipate 
taking all measures which we deem reasonable and prudent in connection with our facilities, construction of the 
underground mine and the operation of the processing facility, there is no assurance that the risks described above will 
not cause delays or cost overruns in connection with such construction or operation. Any delays would postpone our 
anticipated receipt of revenue and adversely affect our operations, which in turn may adversely affect the price of our 
stock.  

Underground mining operations are subject to unique risks. The exploration for minerals, mine construction and 

mining operations in an underground mine involve a high level of risk and are often affected by hazards outside of our 
control. Some of these risks include, but are not limited to, underground fires or floods, fall-of-ground accidents, seismic 
activity and unexpected geological formations or conditions including noxious fumes or gases. The occurrence of one or 
more of these events in connection with our exploration, mine construction, or production activities may result in the 
death of, or personal injury to, our employees, other personnel or third parties, the loss of mining equipment, damage to 
or destruction of mineral properties or production facilities, monetary losses, deferral or unanticipated fluctuations in 
production, environmental damage and potential legal liabilities, all of which may adversely affect our reputation, 
business, prospects, results of operations and financial condition. 

Construction of mine and process facilities is subject to all of the risks inherent in construction and start-up, 

including delays and costs of construction in excess of our projections. Many factors could delay or prevent the start or 
completion of, or increase the costs of, anticipated future construction of the mine and process facility, including: 

•  Design, engineering and construction difficulties or delays; 
•  Cost overruns; 
•  Our failure or delay in obtaining necessary legal, regulatory and other approvals; 

11 

 
 
 
 
 
 
 
 
• 

Interruptions in the supply of the necessary equipment, or construction materials or labor or an increase in their 
price; 
Injuries to persons and property; 

• 
•  Opposition of local and or Non-Governmental-Organization interests; and 
•  Natural disasters, accidents, political unrest or unforeseen events.  

If any of the foregoing events were to occur, our financial condition could be adversely affected and we may be 

required to seek additional capital, which may not be available on commercially acceptable terms, or at all. If we are 
unable to complete such construction, we may not be able to recover any costs already incurred. Even if construction of 
the mine and the processing facilities is completed as scheduled, the costs could exceed our expectations and result in a 
materially adverse effect on our business, results of operations, financial condition, and cash flows. 

Our operations are subject to permitting requirements which could result in the delay, suspension or 
termination of our operations. Our operations, including our ongoing exploration drilling programs and production, 
require permits from governmental authorities. If we cannot obtain or maintain the necessary permits or if there is a 
delay in receiving future permits, our timetable and business plan will be adversely affected.  

Our ability to recognize the benefits of deferred tax assets is dependent on future cash flows and taxable 
income. We recognize deferred tax assets when the tax benefit is considered to be more likely than not of being realized; 
otherwise, a valuation allowance is applied against deferred tax assets. Assessing the recoverability of deferred tax assets 
requires management to make significant estimates related to expectations of future taxable income. Estimates of future 
taxable income are based on forecasted cash flows from operations and the application of existing tax laws in each 
jurisdiction. To the extent that future cash flows and taxable income differ significantly from estimates, our ability to 
realize the deferred tax assets could be impacted. Additionally, future changes in tax laws could limit our ability to 
obtain the future tax benefits represented by our deferred tax assets. At December 31, 2017, our net deferred tax assets 
were $6.9 million. 

Our continuing reclamation obligations at our operations could require significant additional expenditures. We 

are responsible for the reclamation obligations related to disturbances located on all of our properties.  We have a 
liability on our balance sheet to cover the estimated reclamation obligation. However, there is a risk that any reserve 
could be inadequate to cover the actual costs of reclamation when carried out. Continuing reclamation obligations will 
require a significant amount of capital. There is a risk that we will be unable to fund these additional obligations and 
further, that the regulatory authorities may increase reclamation requirements to such a degree that it would not be 
commercially reasonable to continue mining and exploration activities, which may adversely affect our results of 
operations, financial performance and cash flows. 

Our operating properties located in Mexico are subject to changes in political or economic conditions and 
regulations in that country. The risks with respect to Mexico or other developing countries include, but are not limited 
to: nationalization of properties, military repression, extreme fluctuations in currency exchange rates, criminal activity, 
lack of personal safety or ability to safeguard property, labor instability or militancy, mineral title irregularities and high 
rates of inflation. In addition, changes in mining or investment policies or shifts in political attitude in Mexico may 
adversely affect our business. We may be affected in varying degrees by government regulation with respect to 
restrictions on production, price controls, export controls, income taxes, expropriation of property, maintenance of 
claims, environmental legislation, land use, land claims of local people, opposition from non-governmental 
organizations, water use and mine safety. The effect of these factors cannot be accurately predicted and may adversely 
impact our operations.  

Our ability to develop our Mexican properties is subject to the rights of the Ejido (agrarian cooperatives) who 

use or own the surface for agricultural purposes. Our ability to mine minerals is subject to maintaining satisfactory 
arrangements and relationships with the Ejido for access and surface disturbances. Ejidos are groups of local inhabitants 
who were granted rights to conduct agricultural activities on the property. We must negotiate and maintain a satisfactory 
arrangement with these residents in order to disturb or discontinue their rights to farm. While we have successfully 

12 

 
 
 
 
 
 
 
 
negotiated and signed such agreements related to the Aguila and Alta Gracia Projects, our inability to maintain these 
agreements or consummate similar agreements for new projects could impair or impede our ability to successfully 
explore, develop and mine the properties.  

Competition in the mining industry is intense, and we have limited financial and personnel resources with 
which to compete. Competition in the mining industry for desirable properties, investment capital and personnel is 
intense. Numerous companies headquartered in the United States, Canada, and elsewhere throughout the world compete 
for properties and personnel on a global basis. We are a small participant in the gold mining industry due to our limited 
financial and personnel resources. We presently operate with a limited number of personnel and we anticipate operating 
in the same manner going forward. We compete with other companies in our industry to hire qualified personnel when 
needed to successfully operate our mine and processing facility. We may be unable to attract the necessary investment 
capital or personnel to fully explore and if warranted, develop our properties and be unable to acquire other desirable 
properties. We believe that competition for acquiring mineral properties, as well as the competition to attract and retain 
qualified personnel, may continue to be intense in the future. 

Since a significant amount of our expenses in Mexico are paid in Mexican pesos, we are subject to changes in 
currency values that may adversely affect our results of operations. Our operations in the future could be affected by 
changes in the value of the Mexican peso against the United States dollar. The appreciation of non-U.S. dollar currencies 
such as the peso against the U.S. dollar increases expenses and the cost of purchasing capital assets in U.S. dollar terms 
in Mexico, which can adversely impact our operating results and cash flows. Conversely, depreciation of non-U.S. dollar 
currencies usually decreases operating costs and capital asset purchases in U.S. dollar terms. The value of cash and cash 
equivalents, and other monetary assets and liabilities denominated in foreign currencies also fluctuate with changes in 
currency exchange rates. 

Our activities are subject to significant environmental regulations, which could raise the cost of doing business 
or adversely affect our ability to develop our properties. Our mining operations in Mexico are subject to environmental 
regulation by SEMARNAT. Regulations governing advancement of new projects or significant changes to existing 
projects require an environmental impact statement, known in Mexico as a MIA. We may also be required to submit 
proof of local community support for a project to obtain final approval. If an environmental impact statement is adverse 
or if we cannot obtain community support, our ability to explore and develop our properties could be adversely 
affected. Significant environmental legislation exists in Mexico, including fines and penalties for spills, release of 
emissions into the air, and other environmental damage, which fines or penalties could adversely affect our financial 
condition or results of operations.  

In addition, significant state and federal environmental protection laws in the U.S. may hinder our ability to 
explore at our Nevada Mining Unit and may also delay or prohibit us from developing properties where economic 
mineralization is found. Federal laws that govern mining claim location and maintenance and mining operations on 
federal lands are generally administered by the BLM.   Additional federal laws, governing mine safety and health, also 
apply. State laws also require various permits and approvals before exploration, development or production operations 
can begin. Among other things, a reclamation plan must typically be prepared and approved, with bonding in the amount 
of projected reclamation costs. The bond is used to ensure that proper reclamation takes place, and the bond will not be 
released until that time. Local jurisdictions may also impose permitting requirements (such as conditional use permits or 
zoning approvals).  

Our business is subject to the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws, a 

breach or violation of which could lead to civil and criminal fines and penalties, loss of licenses or permits and 
reputational harm. We operate in certain jurisdictions that have experienced governmental and private sector corruption 
to some degree, and in certain circumstances, strict compliance with anti-bribery laws may conflict with certain local 
customs and practices. The U.S. Foreign Corrupt Practices Act and anti-bribery laws in other jurisdictions generally 
prohibit companies and their intermediaries from making improper payments for the purpose of obtaining or retaining 
business or other commercial advantage. Our Code of Ethics and other corporate policies mandate compliance with these 
anti-bribery laws, which often carry substantial penalties. There can be no assurance that our internal control policies and 

13 

 
 
 
 
 
 
 
procedures will always protect us from recklessness, fraudulent behavior, dishonesty or other inappropriate acts 
committed by our affiliates, employees or agents. As such, our corporate policies and processes may not prevent all 
potential breaches of law or other governance practices. Violations of these laws, or allegations of such violations, could 
lead to civil and criminal fines and penalties, litigation, and loss of operating licenses or permits, and may damage our 
reputation, which could have a material adverse effect on our business, financial position and results of operations or 
cause the market value of our common stock to decline. 

We are dependent upon information technology systems, which are subject to disruption, damage, failure and 
risks associated with implementation and integration. We are dependent upon information technology systems in the 
conduct of our operations. Our information technology systems are subject to disruption, damage or failure from a 
variety of sources, including, without limitation, computer viruses, security breaches, cyber-attacks, natural disasters and 
defects in design. Cybersecurity incidents, in particular, are evolving and include, but are not limited to, malicious 
software, attempts to gain unauthorized access to data and other electronic security breaches that could lead to 
disruptions in systems, unauthorized release of confidential or otherwise protected information and the corruption of 
data. Various measures have been implemented to manage our risks related to information technology systems and 
network disruptions. However, given the unpredictability of the timing, nature and scope of information technology 
disruptions, we could potentially be subject to production downtimes, operational delays, the compromising of 
confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation 
or improper use of our systems and networks or financial losses from remedial actions, any of which could have a 
material adverse effect on our cash flows, competitive position, financial condition or results of operations.  

We may also be adversely affected by system or network disruptions if new or upgraded information technology 

systems are defective, not installed properly or not properly integrated into our operations. We are modifying our 
enterprise software to support various operational functions, financial reporting and controls management. The 
modification of this system carries risks such as cost overruns, delays and interruptions. If we are not able to successfully 
implement these system modifications, we may have to rely on manual reporting processes and controls over financial 
reporting that have not been planned, designed or tested. Various measures have been implemented to manage our risks 
related to the system implementation and modification, but system modification failures could have a material adverse 
effect on our business, financial condition and results of operations and could, if not successfully implemented, adversely 
impact the effectiveness of our internal controls over financial reporting. 

The nature of mineral exploration and production activities involves a high degree of risk and the possibility of 

uninsured losses. Exploration for and the production of minerals is highly speculative and involves greater risk than 
many other businesses. Many exploration programs do not result in the discovery of mineralization, and any 
mineralization discovered may not be of sufficient quantity or quality to be profitably mined. Our operations are, and any 
future mining operations or construction we may conduct will be, subject to all of the operating hazards and risks 
normally incident to exploring for and mining of mineral properties, such as, but not limited to: 

•  Economically insufficient mineralized material;  
•  Fluctuation in production costs that make mining uneconomic;  
•  Labor disputes;  
•  Unanticipated variations in grade and other geologic problems;  
•  Environmental hazards;  
•  Water conditions;  
•  Difficult surface or underground conditions;  
• 
•  Metallurgic and other processing problems;  
•  Mechanical and equipment performance problems;  
•  Failure of pit walls, dams, declines, drifts and shafts;  
•  Unusual or unexpected rock formations;  
•  Personal injury, fire, flooding, cave-ins and landslides; and  

Industrial accidents;  

14 

 
 
 
 
 
 
•  Decrease in the value of mineralized material due to lower gold, silver prices, and other metal prices.  

Any of these risks can materially and adversely affect, among other things, the construction of properties, 
production quantities and rates, costs and expenditures, potential revenues and targeted production dates. We currently 
have limited insurance to guard against some of these risks. If we determine that capitalized costs associated with any of 
our mineral interests are not likely to be recovered, we would incur a write down of our investment in these interests. All 
of these factors may result in losses in relation to amounts spent which are not recoverable or result in additional 
expenses.  

We do not insure against all of the risks to which we may be subject in our operations. While we currently 
maintain insurance for general commercial liability claims and the physical assets at our Aguila and Alta Gracia Projects, 
we do not maintain insurance to cover all of the potential risks associated with our operations. We might be subject to 
liability for environmental, pollution or other hazards associated with mineral exploration and mine construction, for 
which insurance may not be available, which may exceed the limits of our insurance coverage, or which we may elect 
not to insure against because of premium costs or other reasons. We may also not be insured against interruptions to our 
operations. Losses from these or other events may cause us to incur significant costs which could materially adversely 
affect our financial condition and our ability to fund activities on our property. A significant loss could force us to reduce 
or suspend our operations. 

We depend upon a limited number of personnel and the loss of any of these individuals could adversely affect 

our business. Due to the relatively limited number of personnel that we employ, we are dependent on certain individuals 
to run our business. These individuals include our executive officers and other key employees. If any of these individuals 
were to die, become disabled or leave our company, we would be forced to identify and retain individuals to replace 
them. There is no assurance that we can find suitable individuals to replace them or to add to our employee base if that 
becomes necessary. We have no life insurance on any individual, and we may be unable to hire a suitable replacement on 
favorable terms should that become necessary. 

Title to mineral properties can be uncertain, and we are at risk of loss of ownership of one or more of our 
properties. Our ability to explore and operate our properties depends on the validity of our title to that property. Our U.S. 
mineral properties include patented and unpatented mining claims. Unpatented mining claims provide only possessory 
title and their validity is often subject to contest by third parties or the federal government, which makes the validity of 
unpatented mining claims uncertain and generally riskier. Our concessions in Mexico are subject to continuing 
government regulation and failure to adhere to such regulations will result in termination of the concession. Uncertainties 
inherent in mineral properties relate to such things as the sufficiency of mineral discovery, proper posting and marking of 
boundaries, assessment work and possible conflicts with other claims not determinable from public record. We have not 
obtained title opinions covering our entire property, with the attendant risk that title to some claims, particularly title to 
undeveloped property, may be defective. There may be valid challenges to the title to our property which, if successful, 
could impair development and/or operations. 

In the event of a dispute regarding title to our Mexican properties, it will likely be necessary for us to resolve the 

dispute in Mexico, where we would be faced with unfamiliar laws and procedures. The resolution of disputes in 
foreign countries can be costly and time consuming. In a foreign country we face the additional burden of understanding 
unfamiliar laws and procedures. We may not be entitled to a jury trial, as we might be in the United States. Further, to 
litigate in any foreign country, we would be faced with the necessity of hiring lawyers and other professionals who are 
familiar with the foreign laws. For these reasons, we may incur unforeseen costs if we are forced to resolve a dispute in 
Mexico or any other foreign country. 

Our directors and officers may be protected from certain types of lawsuits. The laws of the State of Colorado 
provide that our directors will not be liable to us or our shareholders for monetary damages for all but certain types of 
conduct as directors of the company. Our Articles of Incorporation permit us to indemnify our directors and officers 
against all damages incurred in connection with our business to the fullest extent provided or allowed by law. 
Additionally, we entered into individual indemnification agreements with our current directors and officers and we 

15 

 
 
 
 
 
 
 
 
intend to execute substantially similar agreements with future directors and officers. The exculpation provisions of any 
of these items may have the effect of preventing shareholders from recovering damages against our directors caused by 
their negligence, poor judgment or other circumstances. The indemnification provisions may require us to use our limited 
assets to defend our directors and officers against claims, including claims arising out of their negligence, poor judgment 
or other circumstances. Pursuant to the terms of the indemnification agreements, we are required to advance funds to our 
directors and officers prior to the final disposition of any threatened or actual legal proceeding, and including in the event 
it is ultimately determined that such officer or director is not entitled to indemnification pursuant to the terms of the 
indemnification agreement, in which case we will depend on reimbursement of advanced expenses from such individual. 

Risks Related to Our Common Stock 

Our stock price may be volatile and as a result you could lose part or all of your investment. In addition to other 

risk factors identified and to volatility associated with equity securities in general, the value of your investment could 
decline due to the impact of numerous factors upon the market price of our common stock, including:  

•  Changes in the worldwide price for gold and/or silver;  
•  Volatility in the equities markets;  
•  Adverse results from our exploration, development, or production efforts;  
•  Producing at rates lower than those targeted;  
•  Political and regulatory risks;  
•  Weather conditions, including unusually heavy rains;  
•  Failure to meet our revenue or profit goals or operating budget;  
•  Decline in demand for our common stock;  
•  Downward revisions in securities analysts’ estimates or changes in general market conditions;  
•  Technological innovations by competitors or in competing technologies;  
• 
•  Lawsuits; 
•  Actions by government or central banks; and  
•  General economic trends.  

Investor perception of our industry or our prospects;  

Stock markets in general have experienced extreme price and volume fluctuations and the market prices of 
securities have been highly volatile. These fluctuations are often unrelated to operating performance and may adversely 
affect the market price of our common stock. As a result, you may be unable to resell your shares at a desired price.  

Past payments of dividends on our common stock are not an indicator of future payments of dividends. In 2011, 
we instituted a monthly cash dividend payable to holders of our common stock.  However, our ability to continue to pay 
dividends in the future will depend on a number of factors, including, cash flow, mine construction requirements and 
strategies, other acquisition and/or construction projects, spot gold and silver prices, taxation, government-imposed 
royalties and general market conditions. Further, a portion of our cash flow is expected to be retained to finance our 
operations and development of mineral properties. Any material change in our operations may affect future dividends 
which may be modified or canceled at the discretion of our Board of Directors. Any decrease in our monthly dividend 
would likely have an adverse impact on the price of our common stock. 

We are subject to the Continued Listing Criteria of the New York Stock Exchange (“NYSE American”), and 

our failure to satisfy these criteria may result in delisting of our common stock. Our common stock is currently listed 
on the NYSE American. In order to maintain the listing, we must maintain certain share price and other targets, including 
maintaining a minimum amount of shareholders’ equity and a minimum number of public shareholders. In addition to 
objective standards, the NYSE American may delist the securities of any issuer if, in its opinion, the issuer’s financial 
condition and/or operating results appear unsatisfactory; if it appears that the extent of public distribution or the 
aggregate market value of the security has become so reduced as to make continued listing on the NYSE American 
inadvisable; if the issuer sells or disposes of principal operating assets or ceases to be an operating company; if an issuer 

16 

 
 
 
 
 
 
 
 
fails to comply with the NYSE American’s listing requirements; if an issuer’s common stock sells at what the NYSE 
American considers a “low selling price” and the issuer fails to correct this via a reverse split of shares after notification 
by the NYSE American; or if any other event occurs or any condition exists which makes continued listing on the NYSE 
American, in its opinion, inadvisable. 

If the NYSE American delists our common stock, investors may face material adverse consequences, including, 

but not limited to, a lack of trading market for our securities, reduced liquidity, decreased analyst coverage of our 
securities, and an inability for us to obtain additional financing to fund our operations.  

Issuances of our stock in the future could dilute existing shareholders and adversely affect the market price of 

our common stock. We have the authority to issue up to 100,000,000 shares of common stock, 5,000,000 shares of 
preferred stock, and to issue options and warrants to purchase shares of our common stock without stockholder approval. 
As of March 7, 2018, there were 57,107,884 shares of common stock outstanding. Future issuances of our securities 
could be at prices substantially below the price paid for our common stock by our current shareholders. In addition, we 
can issue blocks of our common stock in amounts up to 20% of the then outstanding shares without further shareholder 
approval. Because we have issued less of our common stock than many of our larger peers, the issuance of a significant 
amount of our common stock may have a disproportionately large impact on our share price compared to larger 
companies. 

Our awards of our shares and stock options to employees may not have their intended effect. A portion of our 
total compensation program for our executive officers and key personnel has historically included the award of shares 
and options to buy shares of our common stock. If the price of our common stock performs poorly, such performance 
may adversely affect our ability to retain or attract critical personnel. In addition, any changes made to our stock option 
policies or to any other of our compensation practices which are made necessary by governmental regulations or 
competitive pressures could affect our ability to retain and motivate existing personnel and recruit new personnel.  

ITEM 1B.  UNRESOLVED STAFF COMMENTS 

None.  

ITEM 2. 

PROPERTIES  

We classify our mineral properties into two categories: “Operating Properties” and “Exploration Properties”. 

Operating Properties are properties on which we operate a producing mine and are what we consider a “material” 
property in accordance with SEC Industry Guide 7. 

We currently have an interest in ten properties. Six of our properties, including two Operating Properties and four 

Exploration Properties, are within our Oaxaca Mining Unit located in Oaxaca, Mexico, along the San Jose structural 
corridor. In addition, we have four Exploration Properties within our Nevada Mining Unit located in south central 
Nevada, U.S.A in the Walker Lane Mineral Belt. We own three of the Nevada properties and have an option to purchase 
the fourth. Please see Item 1. Business for additional information about our business. 

Proven and Probable Reserves 

The term “proven (measured) reserves” means reserves for which (a) quantity is computed from dimensions 

revealed in outcrops, trenches, workings or drill holes, grade, and/or quality are computed from the results of detailed 
sampling; and (b) the sites for inspection, sampling and measurements are spaced so closely and the geologic character is 
sufficiently defined that the size, shape, depth and mineral content of reserves is well established. The term “probable 
(indicated) reserves” means reserves for which quantity and grade and/or quality are computed from information similar 
to that used for proven (measured) reserves, but the sites for inspection, sampling, and measurement are farther apart or 
are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, 
is high enough to assume continuity between points of observation. 

17 

 
 
 
 
 
 
 
 
 
 
 
 
As of December 31, 2017, our estimate of Proven and Probable (“P&P”) reserves was:  

Tonnes      

Gold 
g/t     

Silver 

g/t     

Precious 
Metal 
Gold 
Equivalent 
g/t 

Precious 
Metal 
Gold 
Equivalent 
Ounces 

Copper 
% 

Lead 
%     

Zinc 
% 

Gold 
Ounces    

Silver 
Ounces 

   1,987,600 
 433,400 
   2,421,000 

  1.87 
  1.50 
  1.81 

   130 
   124 
   129 

 3.64 
 3.19 
 3.56 

  119,800 
   20,800 
  140,600 

   8,299,800 
   1,730,600 
  10,030,400 

 232,600 
 44,400 
 277,000 

 0.3 
 0.3 
 0.3 

  1.3 
  1.1 
  1.3 

  3.6  
  3.0  
  3.6  

 59,400 
 20,700 
 80,100 
   2,501,100 

  0.71 
  0.65 
  0.69 
  1.77 

   352 
   337 
   348 
   136 

 5.49 
 5.23 
 5.43 
 3.62 

 1,400 
 400 
 1,800 
  142,400 

 672,600 
 224,900 
 897,500 
  10,927,900 

 10,500 
 3,500 
 14,000 
 291,000 

Description 
Arista Mine 
Proven  
Probable 

Arista Mine Total 
Mirador Mine 

Proven  
Probable 

Mirador Mine Total 
Oaxaca Mining Unit Total 

Notes to the 2017 P&P reserves: 

1.  Metal prices used for P&P reserves were $1,222 per ounce of gold, $16.62 per ounce of silver, $2.50 per pound of copper, $0.90 per pound 
of lead and $1.05 per pound of zinc.  These prices reflect the three-year trailing average prices for gold, silver, copper, lead and zinc. 
Precious metal gold equivalent is 73.53:1 using gold and silver only to calculate gold equivalencies. 

2. 
3.  A breakeven Net Smelter Return (“NSR”) cutoff grade of $80 per tonne was used for estimations of P&P reserves at the Arista Underground 

Mine.  The term “cutoff grade” means the lowest NSR value considered economic to process. 

4.  No appreciable amounts of base metals are present in the veins identified to-date at the Mirador Underground Mine at the Alta Gracia property.  
A breakeven cutoff grade of 2.04 g/t gold-equivalent (AuEq) was used for proven and probable reserves at the Mirador Underground Mine 
using gold and silver only to calculate gold equivalencies. 

5.  Mining, processing, energy, administrative and smelting/refining costs were based on 2017 actual costs for the Oaxaca Mining Unit. 
6.  Arista Mine metallurgical recovery assumptions used were 81% for gold, 92% for silver, 73% for copper, 74% for lead and 84% for zinc.  
Mirador Mine metallurgical recovery assumptions used were 74% for gold and 81% for silver.  These recoveries reflect 2017 actual average 
recoveries for the Aguila and Alta Gracia Projects. 
P&P reserves are diluted and factored for expected mining recovery. 

7. 
8.  Minimum mining width for P&P reserves is 1.5 meters. 
9. 

Figures in tables are rounded to reflect estimate precision and small differences generated by rounding are not material to estimates 

For comparison, at December 31, 2016, our estimate of P&P reserves was: 

Tonnes      

Gold 
g/t     

Silver 

g/t     

Precious 
Metal 
Gold 
Equivalent 
g/t 

Gold 
Ounces    

Silver 
Ounces 

   1,495,300 
 352,400 
   1,847,700 

  2.72 
  3.07 
  2.79 

   163 
   147 
   160 

 5.03 
 5.15 
 5.05 

  131,000 
   34,800 
  165,800 

   7,860,500 
   1,667,400 
   9,527,900 

 32,600 
 11,200 
 43,800 
   1,891,500 

  1.12 
  0.86 
  1.06 
  2.75 

   358 
   295 
   342 
   165 

 6.18 
 5.03 
 5.88 
 5.07 

 1,200 
 300 
 1,500 
  167,300 

 374,800 
 106,600 
 481,400 
  10,009,300 

Copper 
% 

Lead 
%     

Zinc 
% 

 0.3 
 0.3 
 0.3 

  1.3 
  1.1 
  1.3 

  3.6  
  3.0  
  3.6  

Precious 
Metal 
Gold 
Equivalent 
Ounces 

 241,900 
 58,300 
 300,200 

 6,500 
 1,800 
 8,300 
 308,500 

Description 
Arista Mine 
Proven  
Probable 

Arista Mine Total 
Mirador Mine 

Proven  
Probable 

Mirador Mine Total 
Oaxaca Mining Unit Total 

Notes to the 2016 P&P reserves: 

1.  Metal prices used for P&P reserves were $1,225 per ounce of gold, $17.29 per ounce of silver, $2.60 per pound of copper, $0.87 per pound 
of lead and $0.94 per pound of zinc. These prices reflect the three-year trailing average prices for gold, silver, copper, lead and zinc. 

18 

 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
   
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
   
   
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
   
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
 
 
 
   
   
  
 
 
 
   
   
  
 
 
Precious metal gold equivalent is 70.85:1 using gold and silver only to calculate gold equivalents. 

2. 
3.  A breakeven Net Smelter Return (“NSR”) cutoff grade of $80 per tonne was used for estimations of P&P reserves. The term “cutoff grade” 

means the lowest NSR value considered economic to process. 

4.  Mining, processing, energy, administrative and smelting/refining costs were based on 2016 actual costs for the Oaxaca Mining Unit. 
5.  Metallurgical recovery assumptions used were 89% for gold, 92% for silver, 78% for copper, 74% for lead and 84% for zinc. These 

recoveries reflect 2016 actual average recoveries for the Aguila project. 
P&P reserves represents estimated in-place material, diluted and factored for expected mining recovery. 

6. 
7.  Minimum mining width for P&P reserves is 1.5 meters. 
8. 

Figures in tables are rounded to reflect estimate precision and small differences generated by rounding are not material to estimates. 

Mineralized Material 

We use the term “mineralized material” to describe mineralization in our mineral deposits that do not constitute 

“reserves” under U.S. reporting requirements set forth in Guide 7. 

In addition to our P&P reserves, we estimate measured and indicated (“M&I”) mineralized material within the 

definition of Guide 7. Mineralized material does not have demonstrated economic viability. The SEC only permits 
issuers to report “mineralized material” in tonnage and average grade without reference to contained ounces or quantities 
of other metals. All of our mineralized material is located at our Oaxaca Mining Unit. 

As of December 31, 2017, our estimate of M&I mineralized material was: 

 Description 
 Arista Mine 
  Measured 
  Indicated 
 Arista Mine Total 
 Alta Gracia Project 
  Measured 
  Indicated 
 Alta Gracia Project Total 
 Margaritas Project 
  Measured 
  Indicated 
 Margaritas Project Total 
 Oaxaca Mining Unit Total 

Notes to the 2017 M&I mineralized material: 

Tonnes       

g/t       Copper %      Lead %      Zinc % 

Silver 

Gold 
g/t       

0.3 
0.2 
0.3 

1.2 
1.2 
1.7 

3.9  
3.6   
3.7   

  677,100 
 1,008,700 
 1,685,800 

23,300 
23,900 
47,200 

19,800 
38,100 
57,900 
  1,790,900  

  1.55 
  1.49 
  1.51 

  0.74 
  0.58 
  0.66 

  0.70 
  0.73 
  0.72 

  112 
  99 
  104 

  275 
  241 
  258 

  280 
  274 
  276 

1.  Metal prices used for M&I mineralized material were $1,222 per ounce of gold, $16.62 per ounce of silver, $2.50 per pound of copper, $0.90 
per pound of lead and $1.05 per pound of zinc.  These prices reflect the three-year trailing average prices for gold, silver, copper, lead and 
zinc. 

2.  A breakeven Net Smelter Return (“NSR”) cutoff grade of $80 per tonne was used for estimations of M&I mineralized material.  The term 

“cutoff grade” means the lowest NSR value considered economic to process. 

3.  No appreciable amounts of base metals are present in the veins identified to-date at the Alta Gracia Project including the Mirador Underground 
Mine, and the Margaritas Project.  A breakeven cutoff grade of 2.04 g/t gold-equivalent (AuEq) was used for M&I mineralized material at 
the Alta Gracia and Margaritas Projects using gold and silver only to calculate gold equivalencies. 

4.  Arista Mine metallurgical recovery assumptions used were 81% for gold, 92% for silver, 73% for copper, 74% for lead and 84% for zinc.  
Alta Gracia and Margaritas projects metallurgical recovery assumptions used were 74% for gold and 81% for silver. These recoveries reflect 
2017 actual average recoveries for the Aguila and Alta Gracia Projects. 

5.  M&I mineralized material is diluted and factored for expected mining recovery. 
6.  Minimum mining width for M&I mineralized material is 1.5 meters. 
7. 

Figures in tables are rounded to reflect estimate precision and small differences generated by rounding are not material to estimates 

19 

 
 
 
 
 
 
    
 
 
 
 
 
 
 
 
 
 
 
 
 
     
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
For comparison, at December 31, 2016, our estimate of M&I mineralized material was: 

Description 
Arista Mine 
Measured 
Indicated 

Arista Mine Total 
Alta Gracia Project 

Measured 
Indicated 

Alta Gracia Project Total 
Margaritas Project 

Measured 
Indicated 

Margaritas Project Total 
Oaxaca Mining Unit Total 
Notes to the 2016 M&I mineralized material: 

Tonnes       

g/t       Copper %      Lead %      Zinc % 

Silver 

Gold 
g/t       

0.4 
0.3 
0.3 

1.7 
1.6 
1.7 

5  
4.5   
4.8   

  777,800 
  955,100 
 1,732,900 

  145,000 
  151,900 
  296,900 

19,800 
38,100 
57,900 
  2,087,700  

  1.95 
  1.21 
  1.54 

  0.36 
  0.36 
  0.36 

  0.70 
  0.73 
  0.72 

  127 
  118 
  122 

  242 
  222 
  232 

  280 
  274 
  276 

1.  Metal prices used for M&I mineralized material were $1,225 per ounce of gold, $17.29 per ounce of silver, $2.60 per pound of copper, 
$0.87 per pound of lead, and $0.94 per pound of zinc. These prices reflect the three-year trailing average prices for gold, silver, copper, 
lead and zinc. 

2.  A breakeven NSR return cutoff grade of $80 per tonne was used for estimations of M&I mineralized material. The term “cutoff grade” 

means the lowest NSR value considered economic to process. 

3.  Metallurgical recovery assumptions used were 89% for gold, 92% for silver, 78% for copper, 74% for lead and 84% for zinc. These 

recoveries reflect 2016 actual average recoveries for the Oaxaca Mining Unit. 

4.  M&I mineralized material represents estimated material in place and diluted and factored for expected mining recovery. 
5.  Minimum mining width for M&I mineralized material is 1.5 meters. 
6. 

Figures in tables are rounded to reflect estimate precision and small differences generated by rounding are not material to estimates 

Our P&P Reserve and M&I Mineralized Material estimates were prepared by our technical staff under the 
direction of Fred H. Brown, Senior Resource Geologist, and Barry Devlin, Vice President of Exploration.  Mr. Brown 
graduated with a Bachelor of Science degree in Geology from New Mexico State University in 1987, obtained a 
Graduate Diploma in Engineering (Mining) in 1997 from the University of the Witwatersrand and a Master of Science in 
Engineering (Civil) from the University of the Witwatersrand in 2005.  He is registered with the Association of 
Professional Engineers and Geoscientists of British Columbia and as a Professional Geoscientist and the Society for 
Mining, Metallurgy and Exploration as a Registered Member.  Mr. Devlin holds a Bachelor of Science degree with 
honors in Geology, 1981, and a Masters in Geology, 1987, from the University of British Columbia, Vancouver, Canada. 
He is also a Professional Geologist registered with the Association of Professional Engineers and Geoscientists of British 
Columbia. 

For a description of the key assumptions, parameters and methods used to estimate Proven and Probable Reserves 
and Mineralized Material included in this report, as well as data verification procedures and a general discussion of the 
extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-
political, marketing or other factors, investors may review the annual reserve report posted on our website 
(http://www.goldresourcecorp.com.) 

20 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Oaxaca Mining Unit 

All of the properties that make up our Oaxaca Mining Unit are located in Oaxaca, Mexico in what is known as the 
San Jose structural corridor, which runs north 70 degrees west. Our properties comprise 55 continuous kilometers of this 
structural corridor which spans three historic mining districts in Oaxaca; the map below shows the general location our 
properties:  

We are granted concessions from the Mexican federal government to explore and mine our properties in Mexico.  

We hold certain properties directly as the concession holder and lease other properties from a third party. Our Oaxaca 
Mining Unit encompasses approximately 69,889 hectares (172,700 acres) covered by 25 mining concessions and 5 lease 
concessions.  The annual concession fees are $430,454 and we have made all necessary payments for 2017.  Please see 
Mining Concessions and Regulations in Mexico, below. 

Operating Properties  

Aguila Project  

Background: The Aguila Project currently comprises 19 mining concessions aggregating 30,215 hectares. 

The early history of activity at the Aguila Project included prospecting and limited mining for gold and silver from 

the early 1900’s to the mid 1960’s. In 1998, the concessions were leased to Apex Silver Mines Corporation of Denver, 
Colorado. Apex carried out an exploration program involving geologic mapping, surface sampling and an 11-hole 
drilling program (1,242 meters). The results did not meet Apex’s expectations so it cancelled its lease on the property in 
2002.  

21 

 
 
 
 
 
 
 
 
 
 
In 2002, we leased the Aguila, El Aire, and La Tehuana concessions from a third party. The Aguila and El Aire 

concessions are part of the Aguila Project and the La Tehuana concession comprises the Margaritas property. The lease 
agreement is subject to a 4% net smelter return royalty where production is sold in the form of gold/silver doré and 5% 
for production sold in concentrate form. Subject to meeting minimum exploration requirements, there is no expiration 
term for the lease. We may terminate it at any time upon written notice to the lessor and the lessor may terminate it if we 
fail to fulfill any of our obligations, which primarily consist of paying the appropriate royalty to the lessor. 

In August 2003, we commenced an initial drilling and exploration program at the Aguila Project. Through 2017, 

we have drilled a total of 907 core holes (both surface and underground) equaling 274,212 meters and 166 reverse 
circulation holes equaling 14,367 meters for a total of 1,073 holes totaling 288,579 meters. 

In 2010, we acquired from a third party, at no additional cost, the El Chacal and El Pilon concessions, which are 

subject to a 2% royalty, but are not subject to the Aguila lease agreement. We filed for and received additional 
concessions from the Mexican government which are also not part of the concessions leased or acquired from the third 
party. The mineral concessions making up the Aguila Project are located within the San Pedro Totolapam and San Pedro 
Quiatoni Ejidos. 

Location and Access: The Aguila Project is located in the Sierra Madre del Sur Mountains of southern Mexico in 

the central part of the State of Oaxaca. The property is located along a major paved highway approximately 120 
kilometers southeast of Oaxaca City, the state’s capital city. The property is approximately four kilometers due northwest 
from the village of San Jose de Gracia. We have constructed gravel and paved roads from the village to the mine and 
processing facility which provides adequate access to the property.  

The climate of the Aguila Project area is dry and warm to very warm with most rainfall occurring in June through 

September and annual precipitation averaging 423.7 mm. The average yearly temperature is 26.6 degrees centigrade. The 
area is very rocky with arid vegetation. Subsistence farming occurs and the main agricultural crop is agave cactus that is 
cultivated for the production of mescal.  

Geology and Mineralization: The Aguila Project is located in the San Jose de Gracia Mining District in Oaxaca. 

Multiple volcanic domes of various scales, and probably non-vented intrusive domes, dominate the district geology. 
These volcanogenic features are imposed on a pre-volcanic basement of sedimentary rocks. Gold and silver 
mineralization in this district is related to the manifestations of this classic volcanogenic system and is considered 
epithermal in character.  

Historically, we have produced ore from two locations on the Aguila property, the Aguila open pit mine and the 
Arista underground mine. The Aguila open pit mineralization is considered low sulfidation, epithermal mineralization 
primarily of gold with some silver and no base metals. The Arista underground mine is considered intermediate 
epithermal mineralization of gold, silver, copper, lead, and zinc. The host rock in the Arista vein system is primarily 
andesite. 

Facilities: We constructed a processing facility and other infrastructure at the Aguila Project for approximately 
$35 million in 2009, and expanded the processing facility in 2012 and 2013, spending an additional $23 million. The 
flotation mill expansion, completed at the end of 2013, increased the number of flotation cells, added a second ball mill 
to allow for additional processing capacity and a Knelson gravity concentrator. In 2014 we completed a doré processing 
facility. The Aguila processing facility is flexible in its ability to process several types of mineralization. It has a 
differential flotation section capable of processing polymetallic ore and producing up to three separate concentrate 
products for sale. The facility also has an agitated leach circuit capable of producing gold and silver doré for sale. 
Depending on the specific type and characteristics of the ore, the facility can process sulfide material in its flotation 
circuit at a nominal 1,500 tonnes of ore per day. The agitated leach circuit can process a nominal 300 tonnes per day.  

22 

 
 
 
 
 
 
 
 
 
 
 
Power is provided by diesel generators at the site. We obtained water rights from the Mexican government for an 

amount of water that we believe is sufficient to meet our operating requirements and pump it approximately five 
kilometers to the site from a permitted well located near the Totolapam River.  

Additional improvements at the site include installation of a second diesel generation power plant and switch gear, 

paving a three-kilometer section of the road from the mine to the processing facility, construction of a new surface 
maintenance garage and fuel station, construction of haul roads from the mine site to the processing facility, office space 
at the processing facility, an assay lab, an exploration office, a tailings impoundment facility and other infrastructure. 

Major construction projects in 2017 consisted of new underground explosive magazines on the second level, a 

ventilation upgrade for the Switchback mining zone, which included the installation of a new 400 horsepower surface 
exhaust fan, and the upgrade of the diesel power generation plant to 9.6 MW installed capacity. 

Exploration Activities 

Our exploration activities during 2017 mainly focused on underground exploration drilling at the Arista and 
Switchback vein systems in the Arista Mine. The Switchback drilling program continued to target further expansion and 
delineation of the multiple high-grade parallel veins for reserve definition, expansion and mine plan optimization.  The 
Switchback strike length has expanded to over 625 meters, a 325-meter expansion from the beginning of 2017, with 
results adding to reserve definition, expansion and Arista Mine plan optimization.  The Switchback vein system remains 
open on strike and vertical extent. Underground drilling during 2017 also delineated 200 meters of strike length on a new 
high-grade ore-shoot discovered on the Splay 31 vein of the Arista vein system. Forty-one underground diamond drill 
holes totaling 13,021 meters were completed at the Aguila Project during 2017.  Data compilation, review, and field 
studies were also conducted during the year in a prospective exploration target area located in the southern portion of the 
Aguila Project. 

Alta Gracia 

Background: In August 2009, we acquired claims adjacent to the Margaritas property in the Alta Gracia Mining 

District by filing concessions known as the David 1, the David 2 and La Herradura, totaling 5,175 hectares. 

As of December 31, 2016, proven and probable reserves had been established for the Mirador Underground Mine 

on our Alta Gracia property.  In July 2017, mine development reached the economic ore zone of the Mirador vein and 
mining began.  A total of 6,350 tonnes were extracted from the Mirador Mine, trucked to, and processed at our Aguila 
processing facility in 2017.  

Location and Access: The Alta Gracia Project is approximately 20 kilometers northeast from the village of San 

Pedro Totalapam, in the Municipality of San Pedro Totolapam.  Access to the project is by a gravel road that departs the 
paved highway approximately 13 kilometers east of the village of San Pedro Totalapam.  The haulage distance by road 
from Alta Gracia to the Aguila processing facility is approximately 32 kilometers. 

Geology and Mineralization: The sedimentary and volcanic units mapped at Alta Gracia are similar to those 
observed at the Aguila project.  The district is dominated by Tertiary-age rhyolite flows and tuffs which are underlain by 
andesite flows and tuff.  Granodiorite and felsic intrusives are observed to outcrop to north and east of the Mirador mine.  
Known vein occurrences at Alta Gracia are mainly hosted in andesite and rhyolite.  The veins currently being mined at 
Alta Gracia are considered low sulfidation epithermal mineralization with economic values only for gold and silver. 

Facilities:  During 2016, we received our operational permit for the Mirador Mine. Explosive magazines, located 

inside the Mirador Mine at the Alicia portal, were also constructed and permitted. 

In 2017, two mine portals were developed to provide access to the Mirador vein. Mine site offices and a mobile 
equipment maintenance shop was established adjacent to the Aguacate portal at the lower 1470 level. Additionally, a 

23 

 
 
 
 
 
 
 
 
 
 
 
 
 
diesel power generation plant, compressed air and a mine water pumping station were developed and became 
operational.  

High grade silver ore from the Mirador Mine is transported by contracted haul trucks to and processed at our 

agitated leach plant at the Aguila processing facility, with final product being doré. 

Exploration Activities: In 2017, we completed 44 surface exploration diamond drill holes totaling 9,936 meters.  
These holes mainly targeted extensions of ore shoots on known veins, such as Huaje and Victoria, that were historically 
mined on a small-scale.  Surface and underground geological mapping and sampling along with detailed topographic 
surveying also continued in the historic mining areas at Alta Gracia.  The new information was used for estimation of 
additional ore and mineralized material and to guide follow-up drilling planned for Alta Gracia in 2018. 

Please see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations 

for information concerning our mining operations at the Aguila Project.  

Exploration Properties 

Margaritas Property  

The Margaritas property is made up of the La Tehuana concession. We leased this concession from a third party in 

October 2002. The terms of this agreement are discussed under “Aguila Project” above. It is comprised of 
approximately 925 hectares located along our 55-kilometer mineralized trend and adjacent to the Aguila Project 

In 2017, results from previous surface drilling, surveying, detailed geological mapping and rock chip channel 

sampling were analyzed for the Margaritas property.  Additional rock chip channel sampling of historic workings was 
also carried out in the Trenes mineralized zone.  A follow-up surface diamond drilling program is targeted for Trenes in 
2018.   Trenes is located approximately 10-kilometers northwest of the Arista Mine along our 55-kilometer mineralized 
trend. 

Chamizo Property 

In June 2011, we staked mineral claims between the Rey property and Alta Gracia property along a trend and 

acquired an exploration concession from the Mexican government of approximately 26,386 hectares referred to 
as Chamizo.  In March 2013, we acquired a property known as Cerro Colorado (comprised of the San Pedro Fracc. 2 
concession) from Almaden Minerals, Ltd. consisting of approximately 1,860 hectares. The Cerro Colorado property is 
surrounded by our Chamizo concession and we include it as part of the Chamizo property. Any future production from 
the Cerro Colorado concession is subject to a 2% net smelter return royalty in favor of Almaden. 

Because of the close proximity of Chamizo to Alta Gracia, exploration activity began on this property during late 

2011 and to date has included geochemical sampling and drilling of eight shallow core holes for a total of 1,327 
meters. We completed the acceptable minimum amount of work required to maintain the claims during 2017 and target 
the same amount of work in 2018. 

Fuego Property 

In March 2013, we acquired the Fuego property (comprised of the San Pedro Fracc. 1 concession) from Almaden 

Minerals Ltd. subject to a 2% net smelter return royalty. The Fuego property consists of approximately 2,554 hectares 
and is located south of our Alta Gracia and Chamizo properties. In 2013, Fuego was included in the property-wide 
airborne geophysical survey. Geologic mapping and surface sampling were conducted on the Fuego property during 
2013 through 2017 to allow us to meet the acceptable minimum amount of work required to maintain the claims. We do 

24 

 
 
 
 
 
 
 
 
 
 
  
 
 
  
not anticipate any significant exploration activities at El Fuego in 2018. However, we plan to conduct the acceptable 
minimum amount of work required to maintain the claims. 

Rey Property 

The Rey property consists of concessions on the far northwest end of our 55-kilometer mineralized corridor in the 
State of Oaxaca known as Rey, El Virrey, La Reyna and El Marquez. We acquired the Rey concession from a third party 
and it is subject to a 2% net smelter return royalty payable to them on a portion of the claims. We obtained the remaining 
concessions by staking claims and filing for concessions with the Mexican government. 

The Rey property is located approximately 64.4 kilometers by road from the Aguila Project. There is no plant or 
equipment on the Rey property. If exploration is successful, any mining would probably require an underground mine 
where mineralized material could be trucked to the Aguila processing facility for processing.  To date, we have drilled 
48 core holes for a total of 5,273 meters at the Rey property. Early in 2012, we completed a small amount of work to 
finish refurbishing and extending an existing shaft on the property to permit underground exploratory drilling. We ceased 
work at the Rey property during 2012, following a request to obtain additional approvals from local community 
agencies. In 2018, we plan to work with the local agencies and anticipate resolving the matter, but we have no assurance 
that we will be able to resume our exploration activities in the near term. If the matter is resolved, we plan to conduct 
follow-up drilling and exploration based on the drilling done in 2008. We do not anticipate any significant exploration 
activities at Rey in 2018. However, we plan to conduct the acceptable minimum amount of work required to maintain the 
claims. 

Mining Concessions and Regulations in Mexico 

Mineral rights in Mexico belong to the Mexican federal government and are administered pursuant to Article 27 of 

the Mexican Constitution. All of our mining concessions are exploitation concessions, which may be granted or 
transferred to Mexican citizens and corporations. Our leases or concessions are held by our Mexican subsidiary. 
Exploitation concessions have a term of 50 years and can be renewed for another 50 years. Concessions grant us the right 
to explore and exploit all minerals found in the ground. Maintenance of concessions requires the semi-annual payment of 
mining duties (due in January and July) and the performance of assessment work, on a calendar year basis, with 
assessment work reports required to be filed in the month of May for the preceding calendar year. The amount of mining 
duties and annual assessment are set by regulation, may increase over the life of the concession and include periodic 
adjustments for inflation. Mining concessions are registered at the Public Registry of Mining in Mexico City and in 
regional offices in Mexico.  

Mexican mining law does not require payment of finder’s fees to the government, except for a discovery premium 
in connection with national mineral reserves, concessions and claims or allotments contracted directly from the Mexican 
Geological Survey. None of the claims held by DDGM are under such a discovery premium regime.  

Ejido Lands and Surface Right Acquisitions in Mexico  

Surface lands within our Oaxaca Mining Unit are Ejido lands (agrarian cooperative lands granted by the federal 
government to groups of Campesinos pursuant to Article 27 of the Mexican Constitution of 1917). Prior to January 1, 
1994, Ejidos could not transfer Ejido lands into private ownership. Amendments to Article 27 of the Mexican 
Constitution in 1994 now allow individual property ownership within Ejidos and allow Ejidos to enter into commercial 
ventures with individuals or entities, including foreign corporations. We have an agreement with the local San Pedro 
Totolapam Ejido allowing exploration and exploitation of mineralization at the Aguila Project and some of our 
surrounding properties.  

Mexican law recognizes mining as a land use generally superior to agriculture. However, the law also recognizes 

the rights of the Ejidos to compensation in the event mining activity interrupts or discontinues their use of the 
agricultural lands. Compensation is typically made in the form of a cash payment to the holder of the agricultural rights. 

25 

 
 
 
  
  
 
 
 
 
 
 
The amount of such compensation is generally related to the perceived value of the agricultural rights as negotiated in 
the first instance between the Ejidos and the owner of the mineral rights. If the parties are unable to reach agreement on 
the amount of the compensation, the decision will be referred to the government.  

We have established surface rights agreements with the San Pedro Totolapam Ejido and the individuals impacted 

by our proposed operations which allow disturbance of the surface where necessary for our exploration activities and 
mining operations. 

Nevada Mining Unit  

In Nevada, we are the owner of three properties and hold the option to purchase a fourth property totaling 1,043 
unpatented mining claims covering approximately 20,600 acres, subject to the paramount title of the United States of 
America, under the administration of the BLM. Under the Mining Law of 1872, which governs the location of 
unpatented mining claims on federal lands, the owner (locator) has the right to explore, develop, and mine minerals on 
unpatented mining claims without payments of production royalties to the U.S. government, subject to the surface 
management regulation of the BLM.  Currently, annual claim maintenance fees are the only federal payments related to 
unpatented mining claims.  Annual maintenance fees of $161,665 were paid during 2017.  

In addition to the unpatented claims, we also own or hold the option to purchase 20 patented mining claims 

covering approximately 333 acres and an additional 200 acres of fee lands in Mineral County, Nevada. The patented 
claims and fee lands are subject to payment of annual property taxes made to the county where they are located.  Annual 
property taxes on our patented claims and fee lands have been paid through June 30, 2018. 

Our primary focus is to discover, delineate and advance potential open pit heap leach gold operations at our 
Nevada Mining Unit and commence production as soon as possible.  We also target equipment sharing synergies 
whereby we may move equipment from one project to the next due to their close proximity (approximately 20 miles or 
less).  The map below shows the general location of our properties within Nevada: 

26 

 
 
 
 
 
 
 
 
Exploration Properties  

Our properties in Nevada are located in the Walker Lane Mineral Belt which is known for its significant and high-

grade gold and silver production.  Activities at our properties in Nevada range from exploration at East Camp Douglas to 
mineral delineation phase at Gold Mesa and Mina Gold to advanced engineering and permitting at Isabella Pearl. We 
believe that our Nevada properties are highly prospective based on their geology, surface samples, drill results, and close 

27 

 
 
 
 
 
proximity to past and current high-grade gold and silver producing mines.  In addition, potential exists with the 
mineralization and historical resource estimates in the case of the Isabella Pearl Project. We believe that our Nevada 
properties have excellent potential for additional discoveries of both bulk tonnage replacement-type and bonanza-grade 
vein-type gold deposits, similar to other gold deposits historically mined in the Paradise Peak, Borealis, Bodie, Tonopah, 
and Goldfield districts.   

Gold Mesa Property 

In November 2015, we acquired an option to purchase a gold exploration property in Nevada, held by Silver 
Reserve Corporation (“SRC”), a wholly-owned subsidiary of Infrastructure Materials Corp., which we refer to as “Gold 
Mesa.” The option gives the Company the exclusive right to purchase the property at any time over a term of 36 months. 
The option is exercisable for $270,000 cash and restricted common stock valued at $1,000,000 at closing. There are no 
work commitments associated with this option. 

Gold Mesa consists of 229 unpatented claims and 3 patented claims in central Nevada’s Walker Lane Mineral 
Belt.  A portion of the property’s claims were mined historically on a very small scale as an underground mine in the 
early 1900’s and as a small open pit mine in the late 1980’s. Existing infrastructure includes nearby electricity, road 
access and potential water from a historic well located on the property. Gold Mesa includes the gold property historically 
known as the Clay Peters Project. After acquiring our option on 89 unpatented and 3 patented claims, we staked an 
additional 140 unpatented claims bringing the total to 4,580 acres for the Gold Mesa property. 

The property is subject to a NSR of 2% in favor of SRC on any future production on all claims with no existing 

royalties and a 1% NSR on the three patented claims. There is an existing 2% NSR on the three patented claims payable 
to an unrelated third party. We have additional rights to purchase one half of each of the 2% NSR and 1% NSR from 
SRC subject to certain terms and restrictions and a first right of refusal to purchase the entire NSR upon a proposed 
disposition by SRC. 

Reverse circulation drilling resumed at Gold Mesa during March 2017. The program targeted extensions of the 

areas of surface and near surface high-grade gold mineralization discovered during previous drilling programs. During 
the year, 68 shallow drill holes totaling 1,935 meters were completed.  We have now tested a total of eight exploration 
targets on the Gold Mesa property.  The Gold Mesa property has potential for a high-grade gold open pit, or multiple 
gold open pits, with surface and near surface mineralization. During 2018, we plan to continue drilling with the goal of 
beginning to connect portions of the eight different targets at Gold Mesa into a larger near surface mineralized zone 
conducive to open pit mining, as well as test the mineralization at depth.  

Isabella Pearl 

In August 2016, we purchased 100% interest in the Isabella Pearl Project which is in advanced stages of 
engineering and production permitting. The property covers an area of approximately 9,000 acres consisting of 494 
unpatented claims.  A historical reserve report completed by a third party prior to our acquisition of the project reported 
P&P Reserves of 191,400 gold ounces at an average grade of 2.18 g/t, which we are currently evaluating and confirming.  
After acquiring Isabella Pearl, we drilled several holes in the deposit for further mineral delineation and additional 
metallurgical testing.  This included 4 holes totaling 735 meters of core drilling and 82 meters in 6 holes of reverse 
circulation drilling.  We also drilled a 400-meter deep water well to supply the project’s future water needs for gold 
production.  We retained several engineering firms in Reno, Nevada to assist us with engineering.  We are optimizing 
our internal mine plan, project designs, ordering long lead time process equipment, and soliciting bids for heap leach and 
mining contractors.  Our goal is to advance the project into production at the earliest possible date, subject to permit 
timing and funding.  We are targeting the production of gold doré from a potential open pit heap leach operation.  

During 2017, we received approvals from the NDEP for our Plan of Operations which was incorporated into the 

Environmental Assessment (“EA”).  The EA for project production permitting was resubmitted to the BLM in the fourth 
quarter.  We are awaiting the BLM regulatory permit approvals in order to move the project forward.   

28 

 
 
 
 
 
 
 
 
 
 
In 2017, we also completed a five-hole, 1,356-meter reverse circulation condemnation drilling program in the 
proposed heap leach area.  In addition, reconnaissance geological mapping and rock chip sampling delineated a new, 
surface high-grade gold target area located along strike to the northwest of the Isabella Pearl deposit currently targeted 
for development. 

Mina Gold 

In August of 2016, we purchased 100% interest in the Mina Gold property located in Nevada’s Walker Lane 
Mineral Belt.  The property has the potential to be a future open pit heap leach gold operation.  Mina Gold reported an 
historic third-party estimate of mineralized material totaling 1,606,000 tonnes grading 1.88 g/t gold. The property covers 
an area of approximately 825 acres consisting of 43 unpatented claims and 5 patented claims.  During 2017, we 
completed a 28-hole reverse circulation drilling program totaling 3,964 meters on the Mina Gold property and await 
pending assays.  This drilling targeted expansion to depth of known surface high-grade gold mineralization on our 
patented claims and included five condemnation holes for a proposed heap leach site.  Additional reverse circulation 
drilling, environmental baseline studies and a preliminary engineering evaluation are targeted for the Mina Gold property 
in 2018. 

East Camp Douglas 

In January 2017, we purchased 100% interest in the East Camp Douglas gold property located in Nevada’s Walker 

Lane Mineral Belt.  The property covers an area of approximately 5,300 acres consisting of 277 unpatented claims, 12 
patented claims and additional fee lands in Mineral County, Nevada. Precious metal epithermal mineralization at East 
Camp Douglas occurs as both widespread high sulfidation alteration areas and low sulfidation veins.  Modern 
exploration by several mining and exploration companies has established modest gold resource potential in five separate 
areas on the property, with over 3,000 meters of drill core and a large exploration database.  We believe this large 
property has numerous untested gold targets with open pit heap leach potential warranting an extensive exploration 
program.  During 2017, historical geological, exploration and mining data on the East Camp Douglas property was 
reviewed and reconnaissance geological mapping and rock chip sampling was carried out on several prospects. A 
systematic rock chip sampling program covering a more than one square kilometer area of gold-bearing silicified 
volcanic rocks was also completed.  In 2018, we plan to evaluate the resource potential of the old mining areas using 
extensive historical drilling and sample data available as well as identifying targets for our first drilling program on the 
gold-bearing silicified volcanic rocks called the “lithocap”. 

2018 Exploration Targets 

In 2018, we anticipate spending approximately $4.2 million for exploration activities in Oaxaca, which will 

include approximately $2.1 million for underground drilling and $2.1 million for surface exploration and concession 
holding costs. In Nevada we anticipate spending $2.0 million on exploration, mainly for surface drilling on our Isabella 
Pearl and Gold Mesa properties during 2018.  We anticipate that all exploration activities will be funded from internally 
generated capital. 

Office Facilities  

We constructed an administrative office building adjacent to the Aguila processing facility and a mine office 
adjacent to the Arista Mine portal as part of the Aguila Project. We also lease office space in Oaxaca City, Oaxaca 
consisting of approximately 3,000 square feet. The lease commenced in 2012 for ten years. In 2014, we sold the building 
that serves as our executive and administrative headquarters in Colorado Springs, Colorado and have leased back a 
portion under a renewable one-year lease. We also lease an office in Denver, Colorado consisting of approximately 2,500 
square feet, which we renewed in 2015 for three years. 

29 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Glossary  

The following terms used in this report shall have the following meanings:  

Andesite: 

Concentrate: 

Cut-and-fill: 

Doré: 

Drift: 

Epithermal: 

Exploration: 

Grade: 

Hectare: 

An extrusive igneous, volcanic rock, of intermediate composition, with aphanitic to 
porphyritic texture characteristic of subduction zones, such as the western margin of South 
America. 

A product from a mineral processing facility such as gravity separation or flotation in which 
the valuable constituents have been upgraded and unwanted gangue materials rejected as 
waste. 

Underground mining method used in vertical stopes in which successive cutting of the ore 
into horizontal slices is carried out starting from the bottom of the stope and progressing 
upwards towards the surface.  

Composite gold and silver bullion usually consisting of approximately 90% precious metals 
that will be further refined to separate pure metals. 

A horizontal tunnel generally driven within or alongside an orebody and aligned parallel to 
the long dimension of the ore. 

Used to describe gold deposits found on or just below the surface close to vents or volcanoes, 
formed at low temperature and pressure. 

Prospecting, sampling, mapping, diamond-drilling and other work involved in locating the 
presence of economic deposits and establishing their nature, shape and grade. 

The concentration of an element of interest expressed as relative mass units (percentage, 
ounces per ton, grams per tonne (“g/t”), etc.). 

Another metric unit of measurement, for surface area. One hectare equals 1/200th of a square 
kilometer, 10,000 square meters, or 2.47 acres. A hectare is approximately the size of a 
soccer field. 

Long-hole Stoping: 

Mining method which uses holes drilled by a production drill to a predetermined pattern by a 
mining engineer.  Long-hole stoping is a highly selective and productive method of mining 
and can cater for varying ore thicknesses and dips (0 - 90 degree).  Blasted rock is designed 
to fall into a supported drawpoint or removed with remote control LHD (load, haul, dump 
machine).    

Mineralized Material:  Minerals or any mass of host rock in which minerals of potential commercial value occur. 

Net Smelter Return 
(“NSR”): 

The net revenue that the owner of a mining property receives from the sale of the mine's 
metal products less transportation and refining costs. As a royalty it refers to the fraction of 
net smelter return that a mine operator is obligated to pay the owner of the royalty agreement.  

Mineral Deposit: 

Rocks that contain economic amounts of minerals in them and that are expected to be 
profitably mined. 

30 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Patented Claim: 

A mining claim for which the U.S. Federal Government has passed its title to the claimant, 
making it private land.  A person may mine and remove minerals from a mining 
claim without a mineral patent. However, a mineral patent gives the owner exclusive title to 
the locatable minerals and in most cases, grants title to the surface. 

Tonne: 

A metric ton. One tonne equals 1000 kg. It is equal to approximately 2,204.62 pounds. 

Unpatented Claim: 

A particular parcel of U.S. Federal land, valuable or believed to be valuable for a specific 
mineral deposit or deposits. It is a parcel for which an individual has asserted a right of 
possession. The right is restricted to the extraction and development of a mineral deposit. 

Volcanogenic: 

Of volcanic origin. 

Volcanic domes: 

These are mounds that form when viscous lava is erupted slowly and piles up over the vent, 
rather than moving away as lava flow. The sides of most domes are very steep and typically 
are mantled with unstable rock debris formed during or shortly after dome emplacement. 
Most domes are composed of silica-rich lava which may contain enough pressurized gas to 
cause explosions during dome extrusion. 

ITEM 3. 

LEGAL PROCEEDINGS  

Not applicable. There were no legal proceedings at December 31, 2017. 

ITEM 4.   MINE SAFETY DISCLOSURES 

Not applicable.  We have no U.S. mines in operation. 

31 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PART II 

ITEM 5.  MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS 

AND ISSUER PURCHASE OF EQUITY SECURITIES  

Market Information 

Our common stock trades on the New York Stock Exchange American (“NYSE American”) under the symbol 
“GORO”. The table below sets forth the high and low sales prices for our common stock on the NYSE American for the 
last two fiscal years on a quarterly basis.  

First Quarter  
Second Quarter  
Third Quarter  
Fourth Quarter  

2017 

2016 

      High        Low           High        Low    
  $  2.47    $  1.15  
  $  3.85    $  2.28  
  $  7.78    $  3.90  
  $  7.26    $  3.80  

  $  6.08    $  4.13  
  $  4.47    $  3.25  
  $  4.32    $  3.46  
  $  4.56    $  3.63  

On March 7, 2018, the high and low sales prices of our common stock on the NYSE American were $4.19 and 

$4.08 respectively, and we had approximately 200 holders of record.  

The following table provides information about our common stock that may be issued upon the exercise of 

options, warrants and rights under all of our equity compensation plans as of December 31, 2017:   

Plan Category 
Equity compensation plans approved by security 

holders:  

Number of Securities 
to be issued upon 
exercise of 
outstanding options, 

warrants and rights (a)      

Weighted-average 
exercise price of 
outstanding options, 
warrants and rights (b)      

Number of securities 
remaining available for 
future issuance under 
equity compensation plans 
(excluding securities 
reflected in column (a)) (c)   

6,454,284 

  $ 

6.99 

4,062,317 

Securities Authorized for Issuance Under Equity Compensation Plans  

On April 14, 2016, our Board of Directors approved the Gold Resource Corporation 2016 Equity Incentive Plan 

(the “Plan”).  The Plan was approved to, among other things, (i) supersede the Gold Resource Corporation Amended and 
Restated Non-Qualified Stock Option and Stock Grant Plan and (ii) provide for the grant of options, stock appreciation 
rights, restricted stock, restricted stock units, stock grants, stock units, performance shares, performance share units, and 
performance cash. These actions were approved by the shareholders of the Company on June 15, 2016.  

Purchases of Equity Securities by the Company 

In September 2011, our Board of Directors authorized a share repurchase of up to $20.0 million with no pre-
established end date. During 2017 and 2016, we did not repurchase any shares of Gold Resource Corporation common 
stock on the open market, and approximately $14.0 million remains available in the share repurchase program as of 
December 31, 2017.  

32 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
  
 
 
 
 
 
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
Performance Graph  

The following performance graph and related information shall not be deemed “soliciting material” or to be 
“filed” with the SEC, nor shall such information be incorporated by reference into any future filing under the Securities 
Act of 1933 or Securities Exchange Act of 1934, each as amended, except to the extent that we specifically incorporate it 
by reference in such filing.  

The following graph compares the performance of our common stock with the performance of the NYSE 
American Composite Index and the S&P TSX Global Gold Fund, assuming reinvestment of dividends on December 31 
of each year indicated. The graph assumes $100 invested at the per share closing price in Gold Resource Corporation and 
each of the indices on December 31, 2012.  

Transfer Agent  

Computershare Investor Services, Inc. is the transfer agent for our common stock. The principal office of 
Computershare is located at 8742 Lucent Boulevard, Suite 225, Highlands Ranch, Colorado 80129 and its telephone 
number is (303) 262-0600.  

33 

 
 
 
 
 
 
 
 
Dividend Policy  

Since commencing mining operations at our Aguila Project, one of management’s primary goals has been to make 

cash dividend distributions to shareholders. Since commercial production began in July 2010, we have returned over 
$110 million back to shareholders in consecutive monthly dividends. Regular dividends should not be considered a 
prediction or guarantee of future dividends.  

Our monthly dividend was modified in December 2015 to reduce the dividend from $0.01 per share per month to 
one-sixth cent per share per month or $0.02 per share per year.  The Board of Directors believed the change in dividend 
was necessary to help conserve capital as reduced cash flow from operations, as well as the long-term negative outlook 
in the mining industry, were negatively affecting our financial performance. The instituted dividend may be modified 
again or discontinued at any time and the declaration of any special dividend is determined at the discretion of our Board 
of Directors, depending on variables such as, but not limited to, operating cash flow, mine construction requirements and 
strategies, other construction projects, spot gold and silver prices, taxation, government royalties and general market 
conditions. At the present time, we are not a party to any agreement that would limit our ability to pay dividends.  

Physical Dividend Program  

In 2012, we launched a physical dividend program pursuant to which our shareholders have the option to convert 

the cash dividends that we pay into physical gold and silver bullion. As part of our overall strategy to diversify our 
treasury and to facilitate this program, we may periodically purchase gold and silver bullion. In order for a shareholder to 
convert their cash dividend into physical gold and/or silver, the shareholder must opt-in to the physical dividend program 
and request the conversion of their cash dividend, or portion thereof, into physical gold and/or silver. For those 
shareholders who elect to convert their cash dividend into gold and/or silver bullion, the gold and silver will be delivered 
in the form of gold or silver Gold Resource Corporation one-ounce bullion rounds. No action is required by any 
shareholder who elects not to participate in the physical metals program. For those shareholders who wish to convert any 
portion of their cash dividend into gold and/or silver bullion, the process is summarized as follows: 

•  Shareholders must register and hold their Gold Resource Corporation common shares in their name directly 
with our transfer agent, Computershare Investor Services, and not through a brokerage house or other 
intermediary held in a “street name”. This is a requirement so that we can locate and validate the shareholder’s 
position in our common stock.  

•  Shareholders must set up an individual account with Gold Bullion International (“GBI”), 1325 Avenue of the 

Americas, 7th Floor, Suite 0703-2, New York, NY 10019. GBI facilitates the cash to gold and silver 
conversion. 

•  Shareholders then direct their cash dividend check issued by Computershare to be electronically deposited to 
the shareholder’s GBI account for the option to have it, or any portion thereof that denominates into a one-
ounce gold or silver bullion round. The election to convert all or any portion of the shareholder’s cash 
dividend into bullion is governed by an agreement between the shareholder and GBI. 

•  Shareholders with accounts at GBI who wish to change their current gold, silver or cash allocations for their 
cash dividend must do so by midnight Eastern Time on the date preceding the monthly dividend record date. 
We issue a press release with details of each dividend declaration, and the dividend record and payment dates. 

•  On the dividend record date, the number of bullion ounces to be converted and distributed to the shareholder’s 
individual account on the dividend payment date is calculated as the dollar value of that portion of the cash 
dividend the shareholder elected to convert to bullion, divided by the London Bullion Market PM gold fix plus 
gold bullion minting cost factors on the record date or the London Bullion Market silver fix plus silver bullion 
minting cost factors on the record date. 

34 

 
 
 
 
 
 
 
 
 
 
 
 
Only whole ounces of gold and silver bullion are credited to a shareholder’s individual account on the dividend 
payment date. The cash value attributable to fractional ounces will remain in the shareholder’s individual account as cash 
until such time as future dividends provide the shareholder with sufficient cash to convert to whole ounces of gold or 
silver based on the London PM gold fix and silver fix on a future dividend record date, and based on the shareholder’s 
self-directed gold, silver or cash allocations in effect at that time. The shareholder may also choose to move their cash 
out of their GBI account. Shareholders cannot move cash into their GBI account for conversion into gold and silver. 
Only the shareholder’s cash dividend sent from Computershare is eligible for conversion. 

We encourage shareholders who have questions concerning the physical dividend program to contact our investor 

relations department at (303) 320-7708.  

ITEM 6. SELECTED FINANCIAL DATA 

The following selected financial data sets forth our summary historical financial data as of and for the years ended 

December 31, 2017, 2016, 2015, 2014 and 2013. This information was derived from our audited consolidated financial 
statements for each year. Our selected historical financial data is qualified in its entirety by, and should be read in 
conjunction with, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations 
and the audited consolidated financial statements and the notes thereto included elsewhere in this report. For additional 
information relating to our operations, please see Item 1. Business and Item 2. Properties.  

Sales, net 
Mine gross profit 
Net income (1) 
Net income per common share: 

Basic and diluted 

Cash dividends declared 

Total Assets (1) 
Long-term obligations  

2017 

Years Ended December 31,  
2014 
2015 
2016 
(In thousands, except per share amounts) 

2013 

  $  110,156   $ 
 42,115 
 4,150 

 83,227  $ 
 22,433 
 4,387 

 92,701   $  115,405   $  125,784  
 58,258  
 50,871 
 30,323 
 5,334  
 15,036 
 3,062 

0.07 
0.02  

0.08 
0.03   

0.06 
0.11  

0.28 
0.12  

0.10  
0.43  

2017 

  $  132,923 
 5,809 

2016 

  $  118,443 
 2,425 

As of December 31,  
2015 
(In thousands) 
 $  106,499 
 2,815 

 $  105,983 
 3,827 

2014 

2013 

 $ 

 91,236  
 2,887  

(1)  Certain changes between the years 2014 and prior may be related to the transition from an Exploration Stage Enterprise to a Production Stage 

Enterprise in accordance with Guide 7. Prior to January 1, 2014, we were considered an Exploration Stage Enterprise under SEC criteria since we 
had not demonstrated proven and probable reserves at our properties. Accordingly, as required under SEC guidelines, substantially all of our 
investment in mining properties up to that date, including construction of the processing facility, mine facilities and mine construction 
expenditures, were expensed as incurred and therefore do not appear as assets on our balance sheet. The change in our accounting presentation as 
a result of our transition to a Production Stage Enterprise may make certain period-over-period comparisons less meaningful. 

Please see the consolidated financial statements included in this Form 10-K under Item 8 for additional 

information. 

35 

 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
  
     
     
  
 
 
 
 
 
   
  
  
  
 
 
   
  
  
  
 
 
 
   
 
  
 
  
 
  
 
 
 
 
   
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
     
     
  
     
     
  
 
 
 
 
 
   
  
  
  
 
 
 
 
ITEM 7.  MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND 

RESULTS OF OPERATIONS  

Except for the historical information, the following discussion contains forward-looking statements that are subject to 
risks and uncertainties. We caution you not to put undue reliance on any forward-looking statements, which speak 
only as of the date of this report. Our actual future results or actions may differ materially from these forward-
looking statements for many reasons, including the risks described in “Risk Factors” and elsewhere in this annual 
report and other reports filed by us with the SEC. Our discussion and analysis of our financial condition and results 
of operations should be read in conjunction with the audited consolidated financial statements and related notes 
included in this report and with the understanding that our actual future results may be materially different from 
what we currently expect.  

Introduction 

The following discussion summarizes our results of operations for three fiscal years ended December 31, 2017, 

2016 and 2015 and our financial condition at December 31, 2017 and 2016, with a particular emphasis on the year ended 
December 31, 2017.  

The discussion also presents certain non-GAAP financial measures that are important to management in its 
evaluation of our operating results and which are used by management to compare our performance with what we 
perceive to be peer group mining companies, and are relied on as part of management’s decision-making process. 
Management believes these measures may also be important to investors in evaluating our performance. For a detailed 
description of each of the non-GAAP financial measures, please see the discussion under Non-GAAP Measures. Please 
see Item 1. Business for a discussion of our business and Item 2. Properties for the use of certain mining terms.  

In our financial statements, we report the sale of precious and base metals as revenue and we periodically review 
our revenue streams to ensure that this treatment remains appropriate. We consider precious metals to be the long-term 
primary driver of our economic decisions and believe that base metals are secondary products. 

Precious metal gold equivalent is determined by taking gold ounces produced or sold, plus silver ounces produced 

or sold converted to precious metal gold equivalent ounces using the gold to silver average realized price ratio for the 
period.  

36 

 
 
 
 
 
 
 
 
 
 
Highlights for the year ended December 31, 2017 are included below and discussed further in our Management’s 

Discussion and Analysis. 

2017 Highlights  

•  Achieved seventh consecutive year of profitability; 
•  Achieved the upper range of our annual gold production target with 28,117 ounces; 
•  Achieved our annual silver production range with 1.77 million ounces; 
•  Ending working capital of $27.5 million 
•  Cash balance increased by $8.2 million to $22.4 million; 
•  Commenced production and optimization at our Alta Gracia Project’s Mirador Mine; 
•  Furthered the Arista’s mine development at the Switchback vein system; 
•  Total cash cost after by-product credits per precious metal gold equivalent ounce sold of $75; 
•  Total all-in sustaining cost per precious metal gold equivalent ounce sold of $590; 
•  Distributed $1.1 million in shareholder dividends. 

Results of Operations—Year Ended December 31, 2017 Compared to Year Ended December 31, 2016 

Overview 

We are a mining company which pursues gold and silver projects that are expected to achieve both low operating 

costs and high returns on capital. We have two mining units, the Oaxaca Mining Unit located in Oaxaca, Mexico and the 
Nevada Mining Unit located in Nevada, USA.  Our Oaxaca Mining Unit consists of six properties and includes mineral 
production from the Arista Mine at the Aguila Project and the Mirador Mine at the Alta Gracia Project.  Both are 
underground mining operations that supply ore to our processing facilities located at the Aguila Project.  We produce 
doré, and metal concentrates which contain precious metals of gold and silver and base metals of copper, lead and zinc.  
Our Nevada Mining Unit consists of four properties and includes the Isabella Pearl Project which is in the advanced 
stages of engineering and mine permitting.  The Isabella Pearl Project mineralization is predominantly gold with some 
silver. We target a development decision at Isabella Pearl at the earliest possible date.   

Sales, net  

Metal sales of $110.2 million for the year ended December 31, 2017 increased by $26.9 million, or 32% when 
compared to the same period in 2016. The increase in our 2017 sales is primarily attributable to an increase in base metal 
realized prices, volumes, and lower treatment charges, partially offset by lower precious metals sales.  For the year ended 
December 31, 2017, average realized prices for base metals increased from the same period in 2016 as follows: copper 
by 33% to $6,354 per tonne, lead by 22% to $2,371 per tonne, and zinc by 37% to $2,993 per tonne.  Average realized 
precious metal prices remained substantially unchanged from 2016.  

Revenue generated from the sale of base metals in our concentrates is considered a by-product of our gold and 

silver production for the purpose of our total cash cost/credit after by-product credits measure noted in our non-GAAP 
measures disclosure. For financial reporting purposes, we report the sale of base metals as part of our revenue. We 
periodically review our revenues to ensure that our reporting of primary products and by-products is appropriate. 
Because we consider copper, lead and zinc to be by-products of our precious metal gold equivalent production, the value 
of these metals is applied as a reduction to total cash costs in our calculation of total cash cost/credit after by-product 
credits per precious metal gold equivalent ounce sold. Please see Non-GAAP Measures for additional information. 

37 

 
 
 
 
 
 
 
 
 
 
 
 
Production  

For the year ended December 31, 2017, gold production of 28,117 ounces increased 2% over the same period in 
2016, while silver production of 1,773,263 ounces decreased 5% from the same period in 2016, primarily due to higher 
grades. 

For the three months ended December 31, 2017, production totaled 9,209 ounces of gold and 555,550 ounces of 
silver, an increase of 81% and 32%, respectively, over the same period in 2016.  The fourth quarter of 2017 benefited 
from higher grades processed, when compared to the fourth quarter of 2016.  The increase in precious metal production 
is attributable to a high-grade area which accounted for 70% of the gold and silver production in the quarter. 

During 2017, the Arista vein system accounted for 55% of the production tonnage followed by Switchback 
development ore at 35%, and the Aguila open pit and Mirador Mine with 8% and 2%, respectively.  Looking forward 
into 2018, we plan to start production stoping of the Switchback vein system, continue mining at a lesser rate in the 
Arista vein system, increase production at the Mirador Mine, and to a lesser extent the Aguila open pit. 

Gold and silver ore grades vary depending on the area of the Arista vein system being mined at any given time.  

We have seen an expected decrease of precious metal grades and an increase in base metal grades as we mined deeper in 
the deposit. The decrease in grades is a function of the metal gradation in the epithermal system.  As we move mining 
operations into the Switchback vein system, we have seen an increase in precious metal grades in the upper levels of the 
system as compared to the lower levels.  Bulk tonnage mining at Switchback during 2018 is planned to commence in the 
bottom level of the current mine development, in a lower grade area, as we plan to mine upward to higher-grade areas of 
Switchback.  Mine expansions laterally in the upper mine levels have an increased chance of higher precious metal 
grades as was seen in areas discovered and mined during 2017.  Exploration efforts target both deeper and lateral 
expansion of the deposit.   

During the three and twelve months ended December 31, 2017, we processed Arista Mine ore through the flotation 

circuit at a rate of 1,357 and 1,301 ore tonnes per day, respectively, compared to 1,373 and 1,295 ore tonnes per day for 
the same periods in 2016.  The agitated leach plant was commissioned in the fourth quarter of 2017 reaching 150 dry 
metric tonnes throughput per day. Operational challenges, however, limited monthly mill production to just over 1,000 
tonnes from the Mirador Mine.  We are targeting 100 tonnes per day from the Mirador Mine in 2018. Achieving this 
processing rate in the future is dependent upon our ability to develop the mine to a point where ore extraction can 
consistently achieve target capacity while meeting grade and dilution parameters.   

Our 2017 full year production of 28,117 gold ounces achieved the upper end of our targeted gold range and 
1,773,263 silver ounces achieved the targeted silver range for the year.  Our 2017 production outlook was 27,500 gold 
ounces and 1,850,000 silver ounces plus or minus 5%. 

On a precious metal gold equivalent basis, our mill production totaled 16,419 ounces and 52,050 ounces for the 
fourth quarter and year ended December 31, 2017, respectively. Please see the Production and Sales Statistics table 
below for additional information regarding our mineral production statistics. 

During 2017, we sold 25,221 gold ounces and 1,630,003 silver ounces at a total cash cost per ounce, after by-
product credits, of $75. The decrease in cash cost per ounce of $473 from the prior year is primarily attributable to higher 
average realized prices on base metals and higher base metal sales as a result of higher recovered grades, consistent with 
our mine plan. During the three months ended December 31, 2017, we sold 7,700 gold ounces and 508,133 silver ounces 
at a total cash credit per gold equivalent ounce of $170. Please see Non-GAAP Measures below for additional 
information concerning the cash cost per ounce measures. 

38 

 
 
 
 
 
 
 
 
 
 
 
2018 Production Targets 

Precious metal production targets for 2018 include 27,000 gold ounces, 1,700,000 silver ounces, with a plus or 

minus range of 10% of each metal.  In addition, significant base metal production of copper, lead, and zinc is expected. 

Please see Production and Sales Statistics table below for additional information regarding our actual mineral 

production statistics.  

Production and Sales Statistics 

Oaxaca Mining Unit  

Milled 

Tonnes Milled (1) 
Tonnes Milled per Day (2) 

Grade 

Average Gold Grade (g/t) 
Average Silver Grade (g/t) 
Average Copper Grade (%) 
Average Lead Grade (%) 
Average Zinc Grade (%) 

Recoveries 

Average Gold Recovery (%) 
Average Silver Recovery (%) 
Average Copper Recovery (%) 
Average Lead Recovery (%) 
Average Zinc Recovery (%) 

Mill production (before payable metal deductions) (3) 

Gold (ozs.) 
Silver (ozs.) 
Copper (tonnes) 
Lead (tonnes) 
Zinc (tonnes) 

Payable metal sold 

Gold (ozs.) 
Silver (ozs.) 
Copper (tonnes) 
Lead (tonnes) 
Zinc (tonnes) 

Average metal prices realized (4) 

Gold ($ per oz.) 
Silver ($ per oz.) 
Copper ($ per tonne) 
Lead ($ per tonne) 
Zinc ($ per tonne) 

Precious metal gold equivalent ounces produced (mill production) (3) 

Gold Ounces 
Gold Equivalent Ounces from Silver  
Total Precious Metal Gold Equivalent Ounces 

Precious metal gold equivalent ounces sold 

Gold Ounces 
Gold Equivalent Ounces from Silver  
Total Precious Metal Gold Equivalent Ounces 
Total cash cost before by-product credits per precious metal gold equivalent ounce sold (5) 
Total cash (credit) cost after by-product credits per precious metal gold equivalent ounce 

sold (5) 

Total all-in sustaining cost per precious metal gold equivalent ounce sold (5) 
Total all-in cost per precious metal gold equivalent ounce sold (5) 

 $ 

$ 
  $ 
  $ 

39 

Three months ended 
December 31,  

2017 

2016 

Year ended 
December 31,  

2017 

2016 

 119,379  
 1,357  

 118,798   
 1,373   

 449,177     
 1,301     

 450,221 
 1,295 

 2.83  
 157  
 0.39  
 2.03  
 4.95  

 85  
 92  
 72  
 73  
 82  

 9,209  
 555,550  
 337  
 1,782  
 4,854  

 7,700  
 508,133  
 297  
 1,633  
 3,607  

 1,279  
 16.60  
 7,164  
 2,531  
 3,524  

 1.53   
 121   
 0.26   
 1.28   
 3.98   

 87   
 91   
 82   
 79   
 84   

 5,088   
 419,683   
 258   
 1,202   
 3,996   

 4,330   
 366,667   
 224   
 1,168   
 3,313   

 1,184   
 16.17   
 5,499   
 2,224   
 2,640   

 2.29     
 134     
 0.34     
 1.60     
 4.39     

 85     
 92     
 75     
 75     
 83     

 2.13 
 139 
 0.29 
 1.21 
 3.78 

 89 
 92 
 78 
 74 
 84 

 28,117     

 27,628 
   1,773,263       1,857,658 
 1,035 
 4,049 
 14,302 

 1,141     
 5,365     
 16,301     

 25,221     

 25,426 
   1,630,003       1,704,336 
 964 
 3,797 
 11,816 

 1,066     
 4,932     
 13,059     

 1,267     
 17.10     
 6,354     
 2,371     
 2,993     

 9,209  
 7,210  
 16,419  

 5,088   
 5,730   
 10,818   

 28,117     
 23,933     
 52,050     

 7,700  
 6,594  
 14,294  
 1,157   $ 

 4,330   
 5,006   
 9,336   
 2,045    $ 

 25,221     
 22,003     
 47,224     
 1,294    $ 

 1,256 
 17.18 
 4,792 
 1,936 
 2,188 

 27,628 
 25,395 
 53,023 

 25,426 
 23,299 
 48,725 
 1,325 

 (170)   $ 
 253   $ 
 270   $ 

 698    $ 
 918    $ 
 1,143    $ 

 75    $ 
 590    $ 
 617    $ 

 548 
 845 
 964 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
  
 
 
 
   
 
   
 
   
     
  
 
 
  
 
 
  
 
 
 
 
(1)  For the fourth quarter of 2017 and 2016 and the year ended December 31, 2017 and 2016, this includes nil, 17,605, 42,079 and 56,369 tonnes, 

respectively, of low-grade stockpile open pit ore. In addition, includes 3,019 and 6,350 tonnes of Mirador ore for the fourth quarter and year 
ended December 31, 2017, respectively.   

(2)  Based on actual days the Aguila processing facility operated during the period. 
(3)  Mill production represents metal contained in concentrates produced at the Aguila processing facility, which is before payable metal deductions 

are levied by the buyer of our concentrates. Payable metal deduction quantities are defined in our contracts with the buyer of our concentrates and 
represent an estimate of metal contained in the concentrates produced at our Aguila processing facility which the buyer cannot recover through 
the smelting process. There are inherent limitations and differences in the sampling method and assaying of estimated metal contained in 
concentrates that are shipped, and those contained metal estimates are derived from sampling methods and assaying throughout the mill 
production process. The Company monitors these differences to ensure that precious metal mill production quantities are materially correct.  
(4)  Average metal prices realized vary from the market metal prices due to final settlement adjustments from our provisional invoices when they are 

settled. Our average metal prices realized will therefore differ from the market average metal prices in most cases. 

(5)  For a reconciliation of this non-GAAP measure to total mine cost of sales, which is the most comparable U.S. GAAP measure, please see Non-

GAAP Measures. 

Mine gross profit. For the year ended December 31, 2017, mine gross profit and mine gross profit percent totaled $42.1 

million and 38% compared to $22.4 million and 27% for the same period in 2016. The increase in mine gross profit and 
mine gross profit percent during 2017 was primarily driven by higher sales volumes, lower treatment and refining costs, 
and higher base metal prices during 2017 as compared to 2016.  

General and administrative expenses. For the year ended December 31, 2017, general and administrative expenses 
totaled $8.1 million, compared to $9.5 million for the same period of 2016. The $1.4 million decrease in 2017, compared to 
2016 is primarily due to decreased IT support fees and employee compensation expenses.    

Exploration expenses. For the year ended December 31, 2017, property exploration expenses totaled $4.3 million 

which is consistent with exploration expense of $4.3 million for the same period of 2016.  

Other expense (income), net. For the year ended December 31, 2017, we recorded other expense of $1.2 million 

compared to other income of $0.6 million during the same period of 2016. The $1.8 million change in 2017 compared to 
the same period in 2016 was due to foreign currency losses in 2017 as a result of the Mexican Peso strengthening against 
the US dollar during the year.  Also contributing to the change was one-time income from insurance reimbursements and 
from the sale of investments in 2016.  No such items occurred in 2017. 

Provision for income taxes. For the year ended December 31, 2017, income tax expense increased to $24.3 million 

from $4.8 million for the same period in 2016. The increase in taxes is mostly due to significant changes to U.S. tax 
legislation which did not result in any cash payments and the Company does not expect any future cash implication.  
Additionally, increases in pre-tax income, utilization of foreign tax credits, and Mexico fixed assets indexation also 
contributed to the increase in tax expense. Please see Note 5 in Item 8. Financial Statements and Supplementary 
Data for additional information.  

Results of Operations – Year Ended December 31, 2016 Compared to Year Ended December 31, 2015 

Mine gross profit. For the year ended December 31, 2016, mine gross profit and mine gross profit percent totaled 

$22.4 million and 27% compared to $30.3 million and 33% for the same period in 2015. The decrease in mine gross 
profit and mine gross profit percent during 2016 was primarily driven by lower sales volume which was partially offset 
with higher realized gold and silver prices during 2016 as compared to 2015.  

General and administrative expenses. For the year ended December 31, 2016, general and administrative expenses 
totaled $9.5 million, compared to $10.3 million for the same period of 2015. The $0.8 million decrease in 2016 compared to 
2015 is primarily due to decreased stock-based compensation, audit fees, and tax consulting fees.  These decreases were 
partially offset by increased IT support fees and employee compensation costs.    

Exploration expenses. For the year ended December 31, 2016, property exploration expenses totaled $4.3 million, 
compared to $7.2 million for the same period of 2015. The $2.9 million decrease in the property exploration spending in 
2016 was a result of our cost saving measures for 2016.  We continued our exploration activities at our Oaxaca Mining 

40 

 
 
 
 
 
 
 
 
 
 
 
Unit in 2016, although at a reduced rate from 2015.  Offsetting the decrease in activities at our Oaxaca Mining Unit were 
our increased activities at our Nevada Mining Unit on the Isabella Pearl property during the fourth quarter of 2016 where 
we spent $1.2 million.  

Other expense (income), net. For the year ended December 31, 2016, we recorded other income of $0.6 million 
compared to other expense of $2.5 million during the same period of 2015. The $3.1 million change in 2016 compared to 
the same period in 2015 was due to foreign currency gains, an increase in value of our gold and silver rounds/bullion, 
and a gain on the sale of equity investments in 2016.  Offsetting these increases were losses on disposal of fixed assets 
and an increase in our reserve for obsolete materials and supplies inventory in 2016.  

Provision for income taxes. For the year ended December 31, 2016, income tax expense decreased to $4.8 million 
compared to $7.4 million for the same period in 2015. The decrease in taxes is commensurate with a decrease in pre-tax 
income, utilization of foreign tax credits, and Mexico fixed assets indexation. Please see Note 5 in Item 8. Financial 
Statements and Supplementary Data for additional information. 

Non-GAAP Measures  

Throughout this report, we have provided information prepared or calculated according to U.S. GAAP and have 

referenced some non-GAAP performance measures which we believe will assist with understanding the performance of 
our business. These measures are based on precious metal gold equivalent ounces sold and include cash cost before by-
product credits per ounce, total cash cost/credit after by-product credits per ounce, total all-in sustaining cost per ounce 
(“AISC”) and all-in cost per ounce (“AIC”). Because the non-GAAP performance measures do not have any 
standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other 
companies. Accordingly, these measures should not be considered in isolation, or as a substitute for, measures of 
performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of 
operating profit or cash flow from operations as determined under GAAP.  

Total cash cost/credit, after by-product credits, is a measure developed by the Gold Institute in an effort to provide 

a uniform standard for comparison purposes. The guidance was first issued in 1996 and revised in November 1999. 
AISC and AIC are calculated based on guidance from the World Gold Council issued in June 2013.  

Total cash cost before by-product credits includes all direct and indirect production costs related to our production 
of metals (including mining, milling and other plant facility costs, smelter treatment and refining charges, royalties, and 
site general and administrative costs) less stock-based compensation allocated to production costs plus treatment and 
refining costs. 

Total cash cost/credit after by-product credits includes total cash cost before by-product credits less by-product 

credits, or revenues earned from base metals.  

AISC includes total cash cost/credit after by-product credits plus other costs related to sustaining production, 
including sustaining allocated general and administrative expenses and sustaining capital expenditures. We determined 
sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and 
execute the current mine plan. 

AIC includes all-in sustaining costs plus non-sustaining capital expenditures and exploration expense related to the 

Oaxaca Mining Unit.  Capital expenditures and exploration expenses related to projects in our Oaxaca Mining Unit are 
classified as non-sustaining. Exploration and capital expenditures to develop new properties outside our Oaxaca Mining 
Unit are excluded from this calculation. 

Cash cost before by-product credits per ounce, total cash cost/credit after by-product credits per ounce, AISC and 
AIC are calculated by dividing the relevant costs, as determined using the cost elements noted above, by precious metal 
gold equivalent ounces sold for the periods presented.  

41 

 
 
 
 
 
 
 
 
 
 
 
 
Reconciliations to U.S. GAAP 

The following table provides a reconciliation of total cash cost/credit after by-product credits to total mine cost of 

sales (a U.S. GAAP measure) as presented in the Consolidated Statements of Operations: 

Three months ended 
December 31,  

Year ended 
December 31,  

      2017 

      2016 

2017 

      2016 

Total cash (credit) cost after by-product credits 
Treatment and refining charges 
By-product credits 
Depreciation and amortization 
Reclamation and remediation 
Stock-based compensation allocated to production costs 
Total mine cost of sales 

(in thousands) 
 6,512   $ 
 (5,213)  
 12,577  
 3,120  
 26  
 14  

 $   (2,440)   $ 
      (2,763)  
      18,972  
 4,283  
 (50)  
 33  

 3,545   $   26,738 
   (16,291) 
 37,827 
 12,169 
 165 
 186 
 $   18,035   $   17,036   $   68,041   $   60,794 

     (7,760)  
     57,552  
     14,554  
 51  
 99  

The following table presents a reconciliation of the non-GAAP measures of total cash cost before by-product 

credits, total cash cost after by-product credits and AISC to AIC: 

Three months ended 
December 31,  

Year ended 
December 31,  

Total cash cost before by-product credits (1) 
By-product credits (2) 

Total cash (credit) cost after by-product credits 

Sustaining capital expenditures  
Sustaining general and administrative expenses 

Total all-in sustaining cost 

Non-sustaining capital expenditures  
Non-sustaining exploration expense 

Total all-in cost 

2017 

      2016 

      2016 

   (12,577)  

    (57,552)  

2017 
(in thousands, except ounces sold and cost 
per precious metal gold equivalent ounce sold) 
 $   16,532   $   19,089    $   61,097   $   64,565 
   (37,827) 
     (18,972)  
 (2,440)  
 5,247  
 793  
 3,600  
 -  
 236  

 3,802 
 1,993 
 3,836   $   10,667    $   29,153   $   46,992 

 3,545  
 21,155  
 3,156  

 26,738 
 11,303 
 3,156 

 6,512   
 1,263   
 789   

 1,205   
 898   

 9  
 1,288  

 27,856  

 41,197 

 8,564   

  $ 

Precious metal gold equivalent ounces sold (3) 

      14,294  

 9,336   

     47,224  

 48,725 

Total cash cost before by-product credits per precious metal gold equivalent 

ounce sold 

By-product credits per precious metal gold equivalent ounce sold 

Total cash (credit) cost after by-product credits per precious metal gold 

equivalent ounce sold 

Other sustaining expenditures per precious metal gold equivalent ounce sold 
Total all-in sustaining cost per precious metal gold equivalent ounce sold 
Non-sustaining expenditures per precious metal gold equivalent ounce sold 

 $ 

 1,157  
 (1,327)  

$ 

 2,045   
 (1,347)  

$ 

 1,294  
 (1,219)  

$ 

 1,325 
 (777) 

 (170)  
 423  

 253  
 17  

 698   
 220   

 918   
 225   

 75  
 515  

 590  
 27  

 548 
 297 

 845 
 119 

 964 

Total all-in cost per precious metal gold equivalent ounce sold 

  $ 

 270   $ 

 1,143    $ 

 617   $ 

(1)  Production cost less stock-based compensation allocated to production cost plus treatment and refining charges. 
(2)  Please see the tables below for a summary of our by-product revenue and by-product credit per precious metal equivalent ounces sold. 
(3)  Gold ounces sold, plus gold equivalent ounces of silver ounces sold converted to gold ounces using our realized gold price per ounce to silver 

price per ounce ratio. 

42 

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
    
 
 
    
 
   
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
 
  
 
  
 
 
 
 
 
  
  
 
  
 
  
 
 
  
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following tables summarizes our by-product revenue and by-product credit per precious metal gold equivalent 

ounce sold: 

By-product credits by dollar value: 

Copper sales 
Lead sales 
Zinc sales 

Total sales from by-products 

By-product credits per precious metal gold equivalent ounce sold: 

Copper sales 
Lead sales 
Zinc sales 

Total by-product credits per precious metal gold ounces sold 

Liquidity and Capital Resources  

Three months ended 
December 31,  

Year ended 
December 31,  

      2017 

      2016 

      2017 

      2016 

(in thousands) 

 $ 

 2,128 
 4,134 
      12,710 
 $   18,972 

 $ 

 1,235 
 2,597 
 8,745 
 $   12,577 

 6,774 
 $ 
      11,699 
      39,079 
 $   57,552 

 $ 

 4,619 
 7,352 
 25,856 
 $   37,827 

Three months ended 
December 31,  

Year ended 
December 31,  

      2017 

      2016 

      2017 

      2016 

  $ 

  $ 

 149   $ 
 289  
 889  
 1,327   $ 

 132   $ 
 278  
 937  
 1,347   $ 

 143   $ 
 248  
 828  
 1,219   $ 

 95 
 151 
 531 
 777 

As of December 31, 2017, we had working capital of $27.5 million, consisting of current assets of $42.5 million 
and current liabilities of $15.0 million. This represents an increase of $7.2 million from the working capital balance of 
$20.3 million at December 31, 2016. Our working capital balance fluctuates as we use cash to fund our operations, 
exploration, mine development, income taxes and our dividends. 

Cash and cash equivalents as of December 31, 2017 increased to $22.4 million from $14.2 million as of December 
31, 2016, a net increase in cash of $8.2 million. The increase is primarily due to higher cash flow from operations which 
was partially offset by higher capital expenditures. 

Net cash provided by operating activities for the year ended December 31, 2017 was $35.6 million compared to 

$17.9 million during the same period in 2016, an increase of $17.7 million. The increase is primarily due to higher 
income before income taxes.  

Net cash used in investing activities for the year ended December 31, 2017 was $25.7 million compared to $14.7 

million during the same period in 2016. The increase in investing activities is primarily attributable to increased mine 
development in our Arista Mine and the purchase of additional mineral rights and equipment at our Nevada Mining Unit. 

Net cash used in financing activities for the year ended December 31, 2017 was $1.4 million compared to $1.9 

million in 2016. The decrease in financing activities was primarily the result of lower dividend and capital lease 
payments in 2017.   

We believe that our liquidity and capital resources are adequate to fund our operations and corporate activities for 

the foreseeable future.  In the event that construction on our Isabella Pearl Project commences in 2018, we would 
evaluate the use of cash, equity financing, debt financing, or a combination thereof to fund the capital requirements.  
There can be no assurances that such financing will be available when or if needed upon acceptable terms, or at all. 

Off-Balance Sheet Arrangements  

As of December 31, 2017, we had no off-balance sheet arrangements.  

43 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
  
  
   
 
  
 
    
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
    
 
   
 
    
 
   
 
   
   
   
   
 
   
   
   
   
 
 
 
 
 
 
 
 
 
Contractual Obligations  

The following table represents a summary of our contractual obligations at December 31, 2017, except short-term 

purchase order commitments arising in the ordinary course of business: 

Loan payable 
Interest on loan payable 
Capital lease obligations 
Interest on capital lease obligation 
Operating lease obligations 
Equipment purchase obligations 

Accounting Developments  

Payments due by Period 

Total 

2018 

2019 
(in thousands) 

2020 

2022 and 
Thereafter 

2021 

 $  2,213 
 191 
    1,600 
 180 
 397 
    3,791 
$  8,372 

 $ 

 568 
 88 
 382 
 79 
   164 
  3,791 
 $  5,072 

 $   594 
 62 
 404 
 57 
 87 
 - 
 $  1,204 

 $ 

 621 
 34 
 427 
 34 
 74 
 - 
 $  1,190 

 $  430 
 7 
    387 
 10 
   72 
 - 
 $  906 

 $ 

 $ 

 - 

 - 

 - 
 - 
 - 

For a discussion of Recently Adopted Accounting Pronouncements and Recently Issued Accounting 

Pronouncements, please see Note 1 in Item 8. Financial Statements and Supplementary Data. 

Critical Accounting Estimates  

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates 

and assumptions that affect the reported amount of assets, liabilities and contingencies at the date of the financial 
statements as well as the reported amounts of revenues and expenses during the reporting period. As a result, 
management is required to routinely make judgments and estimates about the effects of matters that are inherently 
uncertain. Actual results may differ from these estimates under different conditions or assumptions. The following 
discussion pertains to accounting estimates management believes are most critical to the presentation of our financial 
position and results of operations that require management’s most difficult, subjective or complex judgments.  

Proven and Probable Reserves 

Critical estimates are inherent in the process of determining our reserves. Our reserves are affected largely by our 

assessment of future metals prices, as well as by engineering and geological estimates of ore grade, accessibility and 
production cost. Metals prices are estimated at three-year trailing averages. Our assessment of reserves occurs at least 
annually, and we may utilize external audits in the future. Reserves are a key component in the valuation of our property, 
equipment and mine development and related depreciation rates. 

Reserve estimates are used in determining appropriate rates of units-of-production depreciation, with net book 
value of many assets depreciated over remaining estimated reserves. Reserves are also a key component in forecasts, 
with which we compare estimated future cash flows to current asset values in an effort to ensure that carrying values are 
reported appropriately. Reserves are a culmination of many estimates and are not guarantees that we will recover the 
indicated quantities of metals or that we will do so at a profitable level. 

Revenue 

Concentrate sales are initially recorded using quoted metal prices at the time of shipment and contain an embedded 

derivative that is required to be separated from the host contract for accounting purposes. The host contract is the 
receivable from the sale of the concentrates at the quoted metal prices at the time of shipment. The embedded derivative, 
which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to final settlement. 
Changes in the prices of metals that we sell between the shipment and final settlement dates will result in adjustments to 

44 

 
 
 
 
  
 
 
 
 
 
 
   
 
  
 
   
 
   
 
 
 
 
     
     
 
 
 
 
 
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
 
  
 
  
  
  
 
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
revenues related to sales of concentrate previously recorded upon shipment. Sales are recorded net of charges for 
treatment, refining, smelting losses and other charges negotiated with the buyer. These charges are estimated upon 
shipment of concentrates based on contractual terms and adjusted to reflect actual charges at final settlement. 
Historically, actual charges have not varied materially from the Company’s initial estimates. 

Doré sales are recognized using quoted metal prices, net of treatment and refining charges, when the title has been 

transferred and collection of the sales price is reasonably assured. 

Depreciation and Amortization 

Capitalized costs are depreciated or amortized using the straight-line method or unit-of-production (“UOP”) 

method at rates sufficient to depreciate such costs over the shorter of estimated productive lives of such assets or the 
useful life of the individual assets. Significant judgment is involved in the determination of the estimated life of the 
assets. Our estimates for reserves are a key component in determining our UOP rates. Our estimates of proven and 
probable ore reserves may change, possibly in the near term, resulting in changes to depreciation, depletion and 
amortization rates in future reporting periods. Productive lives range from 1 to 10 years, but do not exceed the useful life 
of the individual asset. 

Please see Note 1 in Item 8. Financial Statements and Supplementary Data for depreciation rates of major 

asset categories. 

Impairment of Long-Lived Assets 

We evaluate the carrying value of long-lived assets to be held and used, using a fair-value based approach when 
events and circumstances indicate that the related carrying amount of our assets may not be recoverable. The economic 
environment and commodity prices may be considered as impairment indicators for the purposes of these impairment 
assessments. In accordance with U.S. GAAP, the carrying value of a long-lived asset or asset group is considered 
impaired when the anticipated undiscounted cash flows from such asset or asset group is less than its carrying value. In 
that event, a loss will be recorded in our consolidated statements of operations based on the difference between book 
value and the estimated fair value of the asset or asset group computed using discounted estimated future cash flows, or 
the application of an expected fair value technique in the absence of an observable market price. Future cash flows 
include estimates of recoverable quantities to be produced from estimated proven and probable mineral reserves, 
commodity prices (considering current and historical prices, price trends and related factors), production quantities, 
production costs, and capital expenditures, all based on life-of-mine plans and projections. In estimating future cash 
flows, assets are grouped at the lowest level for which identifiable cash flows exist that are largely independent of cash 
flows from other asset groups. It is possible that actual future cash flows will be significantly different than the estimates, 
as actual future quantities of recoverable minerals, gold and other commodity prices, production levels and costs and 
capital are each subject to significant risks and uncertainties. 

Asset Retirement Obligation/Reclamation and Remediation Costs 

Our mining and exploration activities are subject to various laws and regulations, including legal and contractual 

obligations to reclaim, remediate, or otherwise restore properties at the time the property is removed from service. 
Accounting for reclamation and remediation obligations requires management to make estimates of the future costs that 
we will incur to complete the work required to comply with existing laws and regulations. Actual costs may differ from 
the amounts estimated. Reclamation costs are allocated to expense over the life of the related assets and are periodically 
adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the 
estimates of either the timing or amount of the reclamation and remediation costs. Also, future changes to environmental 
laws and regulations could increase the extent of reclamation and remediation work required. 

45 

 
 
 
 
 
 
 
 
 
 
 
Stock-based Compensation 

We  account  for  stock-based  employee  compensation  plans  under  the  fair  value  recognition  and  measurement 
provisions  in  accordance  with  applicable  accounting  standards,  which  require  all  stock-based  payments  to  employees, 
including grants of stock options and restricted stock units (“RSUs”), to be measured based on the grant date fair value of 
the  awards,  with  the  resulting  expense  generally  recognized  on  a  straight-line  basis  over  the  period  during  which  the 
employee is required to perform service in exchange for the award.  

Stock-based  compensation  expense  is  recorded  net  of  estimated  forfeitures  in  our  consolidated  statements  of 
operations and as such is recorded for only those stock-based awards that we expect to vest. We estimate the forfeiture rate 
based on historical forfeitures of equity awards and adjust the rate to reflect changes in facts and circumstances, if any. We 
will revise our estimated forfeiture rate if actual forfeitures differ from our initial estimates. 

Income Taxes  

In preparing our consolidated financial statements, we estimate the actual amount of taxes currently payable or 

receivable as well as deferred tax assets and liabilities attributable to temporary differences between the financial 
statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred income tax assets 
and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which these 
temporary differences are expected to be recovered or settled. Changes in deferred tax assets and liabilities generally 
have a direct impact on earnings in the period of the changes. Mining taxes represent federal and state taxes levied on 
mining operations. As the mining taxes are calculated as a percentage of mining profits, we classify them as income 
taxes. Where applicable tax laws and regulations are either unclear or subject to varying interpretations, it is possible that 
changes in these estimates could occur that materially affect the amounts of deferred income tax assets and liabilities 
recorded in the consolidated financial statements. 

Each period, we evaluate the likelihood of whether or not some portion or all of each deferred tax asset will be 

realized and provide a valuation allowance for those deferred tax assets for which is more likely than not that the related 
benefits will not be realized. When evaluating our valuation allowance, we consider historic and future expected levels 
of taxable income, the pattern and timing of reversals of taxable temporary timing differences that give rise to deferred 
tax liabilities, and tax planning initiatives. Levels of future taxable income are affected by, among other things, market 
gold and silver prices, production costs, quantities of proven and probable reserves, interest rates, federal and local 
legislation, and foreign currency exchange rates. If we determine that all or a portion of the deferred tax assets will not 
be realized, a valuation allowance will be recorded with a charge to income tax expense. Conversely, if we determine 
that we will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been 
provided, all or a portion of the related valuation allowance will be reduced with a credit to income tax expense. 

In addition, the calculation of income tax expense involves significant management estimation and judgment 
involving a number of assumptions. In determining these amounts, management interprets tax legislation in each of the 
jurisdictions in which we operate and makes estimates of the expected timing of the reversal of future tax assets and 
liabilities. We also make assumptions about future earnings, tax planning strategies and the extent to which potential 
future tax benefits will be used. We are also subject to assessments by various taxation authorities which may interpret 
tax legislation differently, which could affect the final amount or the timing of tax payments. 

ITEM 7A.  QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK  

Our exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, 

foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. We do 
not use derivative financial instruments as part of an overall strategy to manage market risk; however, we may consider 
such arrangements in the future as we evaluate our business and financial strategy. 

46 

 
 
 
 
 
 
 
 
 
 
 
Commodity Price Risk  

The results of our operations depend in large part upon the market prices of gold, silver, and base metal prices of 
copper, lead and zinc. Gold and silver prices fluctuate widely and are affected by numerous factors beyond our control. 
The level of interest rates, the rate of inflation, the stability of exchange rates, the world supply of and demand for gold, 
silver and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external 
economic factors are in turn influenced by changes in international investment patterns, monetary systems and political 
developments. The price of gold and silver has fluctuated widely in recent years, and future price declines could cause a 
mineral project to become uneconomic, thereby having a material adverse effect on our business and financial 
condition. We have not entered into derivative contracts to protect the selling price for gold or silver. We may in the 
future more actively manage our exposure through derivative contracts or other commodity price risk management 
programs, although we have no intention of doing so in the near-term. 

In addition to adversely affecting our reserve estimates, results of operations and/or our financial condition, 
declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately 
determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation 
of a project. 

Foreign Currency Risk  

Foreign currency exchange rate fluctuations can increase or decrease our costs to the extent we pay costs in 
currencies other than the U.S. dollar. We are primarily impacted by Mexican peso rate changes relative to the U.S. 
Dollar, as we incur some costs in Mexican peso. When the value of the peso rises in relation to the U.S. Dollar, some of 
our costs in Mexico may increase, thus affecting our operating results. Alternatively, when the value of the peso drops in 
relation to the US Dollar, peso-denominated costs in Mexico will decrease in U.S. Dollar terms.  These fluctuations do 
not impact our revenues since we sell our metals in U.S. dollars. Future fluctuations may give rise to foreign currency 
exposure, which may affect our financial results. 

We have not utilized market-risk sensitive instruments to manage our exposure to foreign currency exchange rates 

but may in the future actively manage our exposure to foreign currency exchange rate risk. 

Provisional Sales Contract Risk 

We enter into concentrate sales contracts which, in general, provide for a provisional payment based upon 
provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to 
be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of 
concentrates determined at the quoted metal prices at the time of shipment. The embedded derivative, which does not 
qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement.  Changes in the 
prices of metals between the shipment and final settlement date will result in adjustments to revenues related to the sales 
of concentrate previously recorded upon shipment. Please see Note 14 in Item 8. Financial Statements and 
Supplementary Data for additional information. 

Interest Rate Risk  

Our outstanding debt, at fixed rates, consisted of an equipment loan and leased equipment classified as capital 

leases. As the debt is at fixed rates, we consider our interest rate risk exposure to be insignificant at this time.  

 Equity Price Risk  

We have in the past sought and may in the future seek to acquire additional funding by sale of common stock and 

other equity. The price of our common stock has been volatile in the past and may also be volatile in the future. As a 
result, there is a risk that we may not be able to sell our common stock at an acceptable price should the need for new 
equity funding arise. 

47 

 
 
 
  
 
 
  
 
 
 
 
 
 
ITEM 8.  

FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA  

Index to Financial Statements: 

Reports of Independent Registered Public Accounting Firms 
Consolidated Balance Sheets at December 31, 2017 and 2016 
Consolidated Statements of Operations for the years ended December 31, 2017, 2016 and 2015 
Consolidated Statements of Changes in Shareholders' Equity for the years ended December 31, 2017, 
2016 and 2015 
Consolidated Statements of Cash Flows for the years ended December 31, 2017, 2016 and 2015 
Notes to Consolidated Financial Statements 

Page 

49 
52 
53 

54 
55 
56 

48 

 
 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Report of Independent Registered Public Accounting Firm 

To the Shareholders and Board of Directors 
Gold Resource Corporation 
Colorado Springs, Colorado 

OPINIONS ON THE FINANCIAL STATEMENTS AND INTERNAL CONTROL OVER FINANCIAL 
REPORTING 

We  have  audited  the  accompanying  consolidated  balance  sheets  of  Gold  Resource  Corporation  (the 
"Company")  as  of  December  31,  2017  and  2016,  and  the  related  consolidated  statements  of  operations, 
comprehensive income, changes in shareholders' equity, and cash flows, for each year in the two-year period 
ended December 31, 2017, and the related notes (collectively referred to as the "financial statements"). We have 
also audited the Company's internal control over financial reporting as of December 31, 2017, based on the 
criteria established in Internal Control - Integrated Framework: (2013) issued by the Committee of Sponsoring 
Organizations of the Treadway Commission ("COSO"). 

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial 
position of the Company as of December 31, 2017 and 2016, and the results of its operations and its cash flows 
for  each  year  in  the  two-year  period  ended  December  31,  2017,  in  conformity  with  accounting  principles 
generally  accepted  in  the  United  States  of  America.  Also,  in  our  opinion,  the  Company  maintained,  in  all 
material respects, effective internal control over financial reporting as of December 31, 2017, based on criteria 
established in Internal Control - Integrated Framework: (2013) issued by COSO. 

BASIS FOR OPINIONS 

The Company's management is responsible for these financial  statements, for maintaining effective  internal 
control over financial reporting, and for its assessment of the effectiveness of internal control over financial 
reporting, included in the accompanying Management's Report on Internal Control over Financial Reporting. 
Our  responsibility  is  to  express  an  opinion  on  the  Company's  financial  statements  and  an  opinion  on  the 
Company's  internal  control  over  financial  reporting  based  on  our  audits.  We  are  a  public  accounting  firm 
registered with the Public Company Accounting Oversight Board (United States) ("PCAOB") and are required 
to  be  independent  with  respect  to  the  Company  in  accordance  with  the  U.S.  federal  securities  laws  and  the 
applicable rules and regulations of the Securities and Exchange Commission and the PCAOB. 

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan 
and perform the audits to obtain reasonable assurance about whether the financial statements are free of material 
misstatement, whether due to error or fraud, and whether effective internal control over financial reporting was 
maintained in all material respects. 

Our  audits  of  the  financial  statements  included  performing  procedures  to  assess  the  risks  of  material 
misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond 
to  those  risks.  Such  procedures  included  examining,  on  a  test  basis,  evidence  regarding  the  amounts  and 
disclosures in the financial statements. Our audits also included evaluating the accounting principles used and 
significant  estimates  made  by  management,  as  well  as  evaluating  the  overall  presentation  of  the  financial 
statements. Our audit of internal control over financial reporting included obtaining an understanding of internal 
control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating 
the design and operating effectiveness of internal control based on the assessed risk. Our audits also  included 

49 

 
 
 
 
 
 
performing  such  other  procedures  as  we  considered  necessary  in  the  circumstances.  We  believe  that  our 
audits provide a reasonable basis for our opinions. 

DEFINITION AND LIMITATIONS OF INTERNAL CONTROL OVER FINANCIAL REPORTING 

A company's internal control over financial reporting is a process designed to provide reasonable assurance 
regarding the reliability of financial reporting and the preparation of financial statements for external purposes 
in  accordance  with  generally  accepted  accounting  principles.  A  company's  internal  control  over  financial 
reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable 
detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; 

(ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial 
statements in accordance with generally accepted accounting principles, and that receipts and expenditures of 
the  company  are  being  made  only  in  accordance  with  authorizations  of  management  and  directors  of  the 
company;  and  (iii)  provide  reasonable  assurance  regarding  prevention  or  timely  detection  of  unauthorized 
acquisition,  use,  or  disposition  of  the  company's  assets  that  could  have  a  material  effect  on  the  financial 
statements. 

Because  of  its  inherent  limitations,  internal  control  over  financial  reporting  may  not  prevent  or  detect 
misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that 
controls may become inadequate because of changes in conditions, or that the degree of compliance with the 
policies or procedures may deteriorate. 

/s/EKS&H LLLP 

Denver, Colorado 
March 8, 2018 

We have served as the Company's auditor since 2016. 

50 

 
 
 
 
 
 
Report of Independent Registered Public Accounting Firm  

The Board of Directors  
Gold Resource Corporation:  

We have audited the accompanying consolidated statements of income and comprehensive income, changes in 
shareholders’ equity, and cash flows of Gold Resource Corporation and subsidiaries (the Company) for the year 
ended December 31, 2015.  These consolidated financial statements are the responsibility of the Company’s 
management. Our responsibility is to express an opinion on these consolidated financial statements based on 
our audit.  

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board 
(United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about 
whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, 
evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing 
the accounting principles used and significant estimates made by management, as well as evaluating the overall 
financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.  

In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, 
the  results of operations and cash flows for Gold Resource Corporation and subsidiaries  for the year ended 
December 31, 2015, in conformity with U.S. generally accepted accounting principles.  

Denver, Colorado 
March 8, 2016 

/s/ KPMG LLP  

51 

 
 
 
   
 
   
 
   
   
 
 
 
 
 
GOLD RESOURCE CORPORATION 
CONSOLIDATED BALANCE SHEETS 
(U.S. dollars in thousands, except share and per share amounts) 

ASSETS 
Current assets: 

Cash and cash equivalents 
Gold and silver rounds/bullion 
Accounts receivable 
Inventories, net 
Income tax receivable, net 
Prepaid expenses and other current assets 

Total current assets 

Property, plant and mine development, net 
Deferred tax assets, net 
Other non-current assets 
Total assets 

LIABILITIES AND SHAREHOLDERS' EQUITY 
Current liabilities: 

Accounts payable  
Loan payable, current 
Capital lease, current 
Income taxes payable 
Mining royalty taxes payable 
Accrued expenses and other current liabilities 

Total current liabilities 

Reclamation and remediation liabilities 
Loan payable, long-term 
Capital lease, long-term 

Total liabilities 
Shareholders' equity: 

Common stock - $0.001 par value, 100,000,000 shares authorized: 

56,916,484 and 56,566,874 shares outstanding at December 31, 2017 and 2016, respectively 

Additional paid-in capital 
Retained earnings 
Treasury stock at cost, 336,398 shares 
Accumulated other comprehensive loss 

Total shareholders' equity 
Total liabilities and shareholders' equity 

December 31,  

2017 

2016 

 $ 

 22,390   
 3,812   
 2,884   
 11,636   
 -   
 1,767   
 42,489   
 82,599   
 6,854   
 981   
 $  132,923   

$ 

 14,166 
 3,307 
 630 
 8,946 
 626 
 1,587 
 29,262 
 70,059 
 17,580 
 1,542 
$   118,443 

 $ 

 6,904   
 568   
 382   
 1,944   
 2,359   
 2,851   
 15,008   
 2,946   
 1,645   
 1,218   
 20,817   

$ 

 5,383 
 - 
 - 
 - 
 2,033 
 1,526 
 8,942 
 2,425 
 - 
 - 
 11,367 

 57   
 114,584   
 4,520   
 (5,884)  
 (1,171)  
 112,106   
 $   132,923   

 57 
 112,034 
 2,040 
 (5,884) 
 (1,171) 
 107,076 
$   118,443 

The accompanying notes are an integral part of these consolidated financial statements. 

52 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
 
  
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
 
  
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
  
 
  
 
  
 
 
 
 
 
 
 
GOLD RESOURCE CORPORATION 
CONSOLIDATED STATEMENTS OF OPERATIONS 
for the years ended December 31, 2017, 2016 and 2015 
(U.S. dollars in thousands, except share and per share amounts) 

Sales, net 
Mine cost of sales: 

Production costs  
Depreciation and amortization 
Reclamation and remediation 
Total mine cost of sales 

Mine gross profit 
Costs and expenses: 

General and administrative expenses  
Exploration expenses 
Other expense (income), net 
Total costs and expenses 

Income before income taxes 

 Provision for income taxes 

Net income  
Net income per common share: 

Basic and diluted 

Weighted average shares outstanding: 

Basic 
Diluted 

2017 

2016 

2015 

$ 

 110,156  

$ 

 83,227  

$ 

 92,701 

 53,436  
 14,554  
 51  
 68,041  
 42,115  

 8,122  
 4,349  
 1,166  
 13,637  
 28,478  
 24,328  
 4,150  

 0.07  

$ 

$ 

 48,460  
 12,169  
 165  
 60,794  
 22,433  

 9,533  
 4,314  
 (560)  
 13,287  
 9,146  
 4,759  
 4,387  

$ 

 54,362 
 7,974 
 42 
 62,378 
 30,323 

 10,254 
 7,150 
 2,466 
 19,870 
 10,453 
 7,391 
 3,062 

 0.08  

$ 

 0.06 

 56,854,670  
 57,594,993  

 55,140,237  
 55,725,206  

 54,186,547 
 54,259,312 

$ 

$ 

The accompanying notes are an integral part of these consolidated financial statements. 

53 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
 
  
     
 
 
 
   
 
   
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
  
 
 
   
 
   
 
  
 
 
 
 
 
 
 
 
 
 
 
GOLD RESOURCE CORPORATION 
CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY 
for the years ended December 31, 2017, 2016 and 2015 
(U.S. dollars in thousands, except share amounts) 

Number of 
Common 
Shares 

Par Value of 
Common 
Shares 

Additional 
Paid-

in Capital    

Accumulated 
(Deficit)/ 
Retained 
Earnings 

Accumulated 
Other 
Comprehensive 
Loss 

Total 
Shareholders' 
Equity 

Treasury 
Stock 

Balance, December 31, 2014 
Stock options exercised 
Stock-based compensation 
Dividends declared 
Net income 

Balance, December 31, 2015 
Stock options exercised 
Stock-based compensation 
Dividends declared 
Acquisitions 
Net income 

Balance, December 31, 2016 

Adjustment to beginning retained earnings as 

a result of adoption of ASU 2016-16 

Stock-based compensation 
Stock options exercised 
Common stock issued for vested restricted 

stock units 

Common stock issued for the acquisition of 

mineral rights 
Dividends declared 
Net income 

 54,515,767   $ 

 87,337    
 -    
 -    
 -    

 54,603,104   $ 
 169,999    
 -    
 -    
 2,130,169    
 -    

 56,903,272   $ 

 -    
 -    
 25,000    

 78,400    

 246,210    
 -    
 -    

 55   $ 
 -    
 -    
 -    
 -    
 55   $ 
 -    
 -    
 -    
 2    
 -    

 93,094   $ 
 200    
 3,472    
 -    
 -    

 96,766   $ 
 391    
 1,240    
 (271)    
 13,908    
 -    

 57   $   112,034   $ 

 2,040   $   (5,884)   $ 

 -    
 -    
 (6,050)    
 3,062    
 (948)   $   (5,884)   $ 

 -    
 -    
 -    
 -    

 -    
 -    
 (1,399)    
 -    
 4,387    
 2,040   $   (5,884)   $ 

 -    
 -    
 -    
 -    
 -    

 -    
 -    
 -    

 -    

 -    
 -    
 -    

 -    
 1,192    
 58    

 (533)    
 -    
 -    

 -    

 -    

 -    
 -    
 -    

 -    

 1,300    
 -    
 -    

 -    
 (1,137)    
 4,150    
 4,520   $   (5,884)   $ 

 -    
 -    
 -    

 (1,171)   $ 

 -    
 -    
 -    
 -    

 (1,171)   $ 

 -    
 -    
 -    
 -    
 -    

 (1,171)   $ 

 -    
 -    
 -    

 -    

 -    
 -    
 -    

 (1,171)   $ 

 88,134 
 200 
 3,472 
 (6,050) 
 3,062 
 88,818 
 391 
 1,240 
 (1,670) 
 13,910 
 4,387 
 107,076 

 (533) 
 1,192 
 58 

 - 

 1,300 
 (1,137) 
 4,150 
 112,106 

Balance, December 31, 2017 

 57,252,882   $ 

 57   $   114,584   $ 

The accompanying notes are an integral part of these consolidated financial statements. 

54 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
GOLD RESOURCE CORPORATION 
CONSOLIDATED STATEMENTS OF CASH FLOWS 
for the years ended December 31, 2017, 2016 and 2015 
(U.S. dollars in thousands) 

Cash flows from operating activities: 

Net income 
Adjustments to reconcile net income to net cash from operating activities: 

Deferred income taxes 
Depreciation and amortization 
Stock-based compensation 
Other operating adjustments 

Changes in operating assets and liabilities: 

Accounts receivable 
Inventories 
Prepaid expenses and other current assets 
Accounts payable and other accrued liabilities 
Mining royalty and income taxes payable/receivable 
Other noncurrent assets 

Net cash provided by operating activities 

Cash flows from investing activities: 

Capital expenditures 
Proceeds from the sale of equity investments 
Other investing activities 

Net cash used in investing activities 

Cash flows from financing activities: 

Proceeds from the exercise of stock options 
Dividends paid 
Repayment of loan payable 
Repayment of capital leases 

Net cash used in financing activities 

Effect of exchange rate changes on cash and cash equivalents 
Net increase (decrease) in cash and cash equivalents 
Cash and cash equivalents at beginning of period 
Cash and cash equivalents at end of period 

Supplemental Cash Flow Information 

Interest expense paid 
Income and mining taxes paid 

Non-cash investing activities: 

Increase (decrease) in accrued capital expenditures 
Equipment purchased through loan payable 
Equipment purchased under capital leases 
Common stock issued for the acquisition of mineral rights 

Year ended December 31,  

      2017 

      2016 

2015 

 $ 

 4,150   $ 

 4,387   $ 

 3,062 

 14,991  
 14,998  
 1,192  
 1,285  

 (2,254)  
 (2,797)  
 (448)  
 1,636  
 2,887  
 (7)  
 35,633  

 (1,555)  
 12,588  
 1,240  
 298  

 (309)  
 (738)  
 793  
 (3,579)  
 4,695  
 79  
 17,899  

 5,133 
 9,097 
 3,472 
 2,874 

 1,095 
 (430) 
 233 
 3,357 
 (7,721) 
 (2) 
 20,170 

   (25,432)  
 -  
 (257)  
    (25,689)  

   (15,140)  
 749  
 (302)  
   (14,693)  

   (26,685) 
 - 
 (55) 
   (26,740) 

 -  
 (1,137)  
 (184)  
 (73)  
 (1,394)  

 391  
 (1,670)  
 -  
 (606)  
 (1,885)  

 - 
 (6,502) 
 - 
 (1,501) 
 (8,003) 

 (326)  
 8,224  
 14,166  

 (146) 
   (14,719) 
 27,541 
  $   22,390   $   14,166   $   12,822 

 23  
 1,344  
 12,822  

  $ 
  $ 

 65   $ 
 3,102   $ 

 13   $ 
 256   $ 

 78 
 9,514 

 $ 
 $ 
 $ 
 $ 

 1,041   $   (2,868)   $ 
 -   $ 
 2,397   $ 
 300   $ 
 1,686   $ 
 1,300   $   13,910   $ 

 1,358 
 - 
 - 
 - 

The accompanying notes are an integral part of these consolidated financial statements. 

55 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      
  
 
 
 
 
 
  
  
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
  
 
  
 
 
 
 
  
   
 
   
 
 
 
 
 
 
 
 
 
 
  
  
 
  
 
 
 
 
  
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
  
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
   
 
   
 
 
  
   
 
   
 
 
  
   
 
 
 
 
 
 
 
GOLD RESOURCE CORPORATION 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS  

December 31, 2017, 2016 and 2015 

1. Nature of Operations and Summary of Significant Accounting Policies  

Nature of Operations 

Gold Resource Corporation (the “Company”) was organized under the laws of the State of Colorado on August 24, 

1998. The Company is a producer of metal concentrates that contain gold, silver, copper, lead and zinc, and doré 
containing gold and silver at the Aguila and Alta Gracia Projects in the southern state of Oaxaca, Mexico (“Oaxaca 
Mining Unit”). The Aguila Project includes the Arista underground mine and processing facility, which are currently in 
operation. The Alta Gracia Project includes the Mirador underground mine which began operations in 2017.  The 
Company also performs exploration and evaluation work on our portfolio of precious metal exploration properties in 
Nevada, United States of America (“Nevada Mining Unit”) and continues to evaluate other properties for possible 
acquisition.  

Significant Accounting Policies  

Basis of Presentation  

The consolidated financial statements included herein are expressed in United States dollars, and conform to 

United States generally accepted accounting principles (“U.S. GAAP”). The consolidated financial statements include 
the accounts of the Company, its Mexican subsidiary, Don David Gold Mexico S.A. de C.V. (“Don David Gold 
Mexico”) and its wholly-owned United States subsidiaries GRC Nevada Inc. and Walker Lane Minerals Corp. (“Walker 
Lane”). Intercompany accounts and transactions have been eliminated in consolidation. 

Use of Estimates 

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates 

and assumptions that affect the reported amount of assets and liabilities and disclosure of contingent assets and liabilities 
at the date of the financial statements and the reported amounts of revenues and expenses during the reporting periods. 
Management routinely makes judgments and estimates about the effects of matters that are inherently uncertain and 
bases its estimates and judgments on historical experience and on various other factors that are believed to be reasonable 
under the circumstances. Actual results could differ from these estimates.  

Reclassifications 

Certain amounts presented in prior periods have been reclassified to conform to the current period presentation. 

The reclassifications had no material effect on the Company’s results of operations or financial condition.  

Cash and Cash Equivalents 

Cash and cash equivalents consist of all cash balances and highly liquid investments with a remaining maturity of 

three months or less when purchased and are carried at cost.  

Gold and Silver Rounds/Bullion 

From time to time, the Company may purchase gold and silver bullion on the open market in order to diversify its 

treasury and provide an option for shareholders to convert their dividends into bullion. The purchased gold and silver 
bullion is carried at quoted market value prices based on the daily London P.M. fix as of the balance sheet date. The 

56 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Company considers bullion a highly-liquid investment. 

Accounts Receivable 

Accounts receivable consists of trade receivables from the sale of doré and metals concentrates, as well an 
embedded derivative based on mark-to-market adjustments for outstanding provisional invoices based on metal forward 
prices. 

Inventories 

The major inventory categories are set forth below: 

Stockpile Inventories: Stockpile inventories represent ore that has been mined and is available for further 

processing. Stockpiles are measured by estimating the number of tonnes added and removed from the stockpile, an 
estimate of the contained metals (based on assay data) and the estimated metallurgical recovery rates. Costs are allocated 
to stockpiles based on relative values of material stockpiled and processed using current mining costs incurred, including 
applicable overhead, depreciation and amortization relating to mining operations. Material is removed at each stockpile’s 
average cost per tonne. Stockpiles are carried at the lower of average cost or net realizable value. Net realizable value 
represents the estimated future sales price of the product based on current and long-term metals prices, less the estimated 
costs to complete production and bring the product to sale. The current portion of stockpiles is determined based on the 
expected amounts to be processed within the next 12 months. Stockpiles not expected to be processed within the next 12 
months are classified as long term. As of December 31, 2017, all stockpiles were classified as current. 

Concentrate Inventories: Concentrates inventories include metal concentrates located either at the Company’s 

facilities or in transit to its customer’s port. Inventories consist of copper, lead and zinc metal concentrates, which also 
contain gold and silver mineralization. Concentrate inventories are carried at the lower of cost of production or net 
realizable value based on current metals prices. 

Doré Inventory: Doré includes gold and silver doré bars held at the Company’s facility. Doré inventories are 

carried at the lower of cost of production or net realizable value based on current metals prices. 

Materials and Supplies Inventories: Materials and supplies inventories consist of chemical reagents, parts, fuels 
and other materials and supplies. Cost includes applicable taxes and freight. Materials and supplies inventory is carried at 
lower of average cost or net realizable value. 

Write-downs of inventory are charged to expense. 

IVA Taxes Receivable and Payable 

In Mexico, value added (“IVA”) taxes are assessed on purchases of materials and services and sales of products. 

Businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either 
as a refund or as a credit against future taxes payable. Likewise, businesses owe IVA taxes as the business sells a product 
and collects IVA taxes from its customers.  

Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax 

receivable or payable, since there is a legal right of offset of IVA taxes. 

Property, Plant and Mine Development 

Land and Mineral Rights: The costs of acquiring land and mineral rights are considered tangible assets.  
Administrative and holding costs to maintain an exploration property are expensed as incurred. If a mineable mineral 
deposit is discovered, such capitalized costs are amortized when production begins using the units of production 
(“UOP”) method. If no mineable mineral deposit is discovered or such rights are otherwise determined to have 

57 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
diminished value, such costs are expensed in the period in which the determination is made.  

Mine Development: The costs include engineering and metallurgical studies, drilling and other related costs to 
delineate an ore body, the building of access ways, shafts, lateral access, drifts, ramps and other infrastructure. Costs 
incurred before mineralization is classified as proven and probable reserves are expensed and classified as exploration 
expenses. Capitalization of mine development project costs, that meet the definition of an asset, begins once 
mineralization is classified as proven and probable reserves. 

Drilling costs incurred during the production phase for operational ore control are allocated to inventory costs and 

then included as a component of production costs. All other drilling and related costs are expensed as incurred. 

Mine development costs are amortized using UOP based on estimated recoverable ounces in proven and probable 

reserves.  

Property and Equipment: All items of property and equipment are carried at cost. Normal maintenance and repairs 

are expensed as incurred while expenditures for major maintenance and betterments are capitalized. Gains or losses on 
disposition are recognized in other expense (income). 

Construction in Progress:  Expenditures for new facilities or equipment are capitalized and recorded at cost.  Once 

completed and ready for its intended use, the asset is transferred to property and equipment to be depreciated or 
amortized. 

Depreciation and Amortization: Capitalized costs are depreciated or amortized using the straight-line or UOP 
method at rates sufficient to depreciate such costs over the shorter of estimated productive lives of such assets or the 
useful life of the individual assets. The estimates for mineral reserves are a key component in determining the UOP 
depreciation rates. The estimates of reserves may change, possibly in the near term, resulting in changes to depreciation 
and amortization rates in future reporting periods. The following are the estimated economic lives of depreciable assets: 

Asset retirement costs 
Furniture, computer and office equipment 
Light vehicles and other mobile equipment 
Machinery and equipment  
Mill facilities and related infrastructure 
Mine development 

Impairment of Long-Lived Assets 

Range of Lives 
UOP 
3 to 10 years 
4 years 
  UOP to 4 years 
UOP 
UOP 

The Company evaluates its long-lived assets for impairment when events or changes in circumstances indicate that 
the related carrying amounts may not be recoverable. Asset impairment is considered to exist if the total estimated future 
cash flows on an undiscounted basis are less than the carrying amount of the asset. If an impairment is indicated, a 
determination is made whether an impairment has occurred and any impairment losses are measured as the excess of 
carrying value over the total discounted estimated future cash flows, or the application of an expected fair value 
technique in the absence of an observable market price and are charged to expense on the Company’s consolidated 
statements of operations. In estimating future cash flows, assets are grouped at the lowest level for which there are 
identifiable cash flows that are largely independent of future cash flows from other asset groups.  

Existing reserves and other mineralized material are included when estimating the fair value in determining 

whether the assets are impaired. The Company’s estimates of future cash flows are based on numerous assumptions 
including expected gold and other commodity prices, production levels, capital requirements and estimated salvage 
values and it is possible that actual future cash flows will be significantly different than the estimates, as actual future 
quantities of recoverable minerals, gold and other commodity prices, production levels and costs and capital are each 
subject to significant risks and uncertainties. 

58 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Treasury Stock 

Treasury stock represents shares of the Company’s common stock which have been repurchased on the open 

market at the prevailing market price at the time of purchase and have not been cancelled. Treasury stock is shown at 
cost as a separate component of equity.  

Revenue Recognition  

The Company recognizes revenue when an arrangement exists, the price is fixed and determinable, the title and 

risk of loss have transferred to the buyer and collection is reasonably assured. 

Concentrate sales: Concentrate sales are initially recorded using quoted metal prices at the time of shipment and 

contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host 
contract is the receivable from the sale of the concentrates at the quoted metal prices at the time of shipment. The 
embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period 
prior to final settlement. Changes in the prices of metals that the Company sells, as quoted on the London Bullion 
Market, between the shipment and final settlement dates will result in adjustments to revenues related to sales of 
concentrate previously recorded upon shipment. Sales are recorded net of charges for treatment, refining, smelting losses 
and other charges negotiated with the buyer. These charges are estimated upon shipment of concentrates based on 
contractual terms and adjusted to reflect actual charges at final settlement. Historically, actual charges have not varied 
materially from the Company’s initial estimates. 

Doré sales: Doré sales are recognized using quoted metal prices, net of treatment and refining charges, when the 

title has been transferred and collection of the sales price is reasonably assured.  

Production Costs 

Production costs include labor and benefits, royalties, concentrate and doré shipping costs, mining subcontractors, 
fuel and lubricants, legal and professional fees related to mine operations, stock-based compensation attributable to mine 
workers, materials and supplies, repairs and maintenance, explosives, housing and food, insurance, reagents, travel, 
medical services, security equipment, office rent, tools and other costs that support mining operations. 

Exploration Costs 

Exploration costs are charged to expense as incurred. Costs to identify new mineral resources and to evaluate 

potential resources are considered exploration costs.  

Stock-Based Compensation 

The Company accounts for stock-based compensation under the fair value recognition and measurement 
provisions of U.S. GAAP. Those provisions require all stock-based payments, including grants of stock options and 
restricted stock units (“RSUs”), to be measured based on the grant date fair value of the awards, with the resulting 
expense generally recognized on a straight-line basis in the consolidated statements of operations over the period during 
which services are performed in exchange for the award. The majority of the awards are earned over a service period 
of three years. The Company's estimates may be impacted by certain variables including, but not limited to, stock price 
volatility, employee stock option exercise behaviors, additional stock option grants, and estimates of forfeitures. 

Reclamation and Remediation Costs 

Reclamation costs are allocated to expense over the life of the related assets and are periodically adjusted to reflect 

changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the 
timing or amount of the reclamation and remediation costs. Reclamation obligations are based in part on when the 

59 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
spending for an existing environmental disturbance will occur. The Company reviews, at least on an annual basis, the 
reclamation obligation at each mine. 

Prior to 2014, the Company had been recognizing only reclamation and remediation obligations and all associated 
asset retirement costs were written off due to the exploration stage status of the Company. In 2014, the Company became 
a production stage company and therefore capitalized asset retirement costs and recorded an asset retirement obligation. 
Please see Note 9 for additional information. 

Accounting for reclamation and remediation obligations requires management to make estimates unique to each 

mining operation of the future costs expected to be incurred to complete the reclamation and remediation work required 
to comply with existing laws and regulations. Actual costs incurred in future periods could differ from amounts 
estimated. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation 
and remediation work required. Any such increases in future costs could materially impact the amounts charged to 
earnings for reclamation and remediation.  

Accumulated Other Comprehensive Loss 

Accumulated other comprehensive loss is presented in the consolidated statements of changes in shareholders’ 

equity. Accumulated other comprehensive loss is composed of foreign currency translation adjustment effects related to 
the historical adjustment when the functional currency was the Mexican peso.  

Income and Mining Royalty Taxes 

Income taxes are computed using the asset and liability method. Deferred income taxes reflect the net tax effects of 
temporary differences between the carrying amounts of assets and liabilities for financial and tax reporting purposes and 
the effect of net operating loss and foreign tax credit carry-forwards using enacted tax rates in effect in the years in 
which the differences are expected to reverse. Deferred tax assets are evaluated to determine if it is more likely than not 
that they will be realized. Please see Note 5 for additional information. 

Net Income Per Share 

Basic earnings per share is calculated based on the weighted average number of common shares outstanding for 

the period.  Diluted income per share reflects the dilution that could occur if potentially dilutive securities, as determined 
using the treasury stock method, are converted into common stock. Potentially dilutive securities are excluded from the 
calculation when their inclusion would be anti-dilutive, such as periods when a net loss is reported or when the exercise 
price of the instrument exceeds the average fair market value.  

Foreign Currency 

The functional currency for all of the Company’s subsidiaries is the United States dollar (“U.S. dollar”). 

Concentration of Credit Risk  

The Company has considered and assessed the credit risk resulting from its concentrate sales and doré sales 

arrangements with its customers and believes it is not exposed to significant credit risk in relation to the counterparty 
meeting its contractual obligations as it pertains to its trade receivables during the ordinary course of business. In the 
event that the Company’s relationships with its customers are interrupted for any reason, the Company believes that it 
would be able to locate another entity to purchase its metals concentrates and doré bars; however, any interruption could 
temporarily disrupt the Company’s sale of its products and adversely affect operating results. 

The Company’s Aguila and Alta Gracia Projects, which are located in the State of Oaxaca, Mexico, accounted for 

100% of the Company’s total sales for the years ended December 31, 2017, 2016 and 2015. 

60 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Some of the Company’s operating cash balances are maintained in accounts that currently exceed federally insured 

limits. The Company believes that the financial strength of the depositing institutions mitigates the underlying risk of 
loss. To date, these concentrations of credit risk have not had a significant impact on the Company’s financial position or 
results of operations.  

Recently Adopted Accounting Pronouncements 

Accounting Standards Update 2016-09—Compensation—Stock compensation (Topic 718): Improvements to 
employee share-based payment accounting. On March 30, 2016, the Financial Accounting Standards Board (“FASB”) 
issued guidance intended to improve the accounting for employee stock-based payments. The standard affects all 
organizations that issue stock-based payment awards to their employees and was part of the FASB’s Simplification 
Initiative. The objective of the Simplification Initiative is to identify, evaluate, and improve areas of U.S. GAAP for 
which cost and complexity can be reduced while maintaining or improving the usefulness of the information provided to 
users of financial statements. The areas for simplification in this standard involve several aspects of the accounting for 
stock-based payment transactions, including the income tax consequences, classification of awards as either equity or 
liabilities, and classification on the statement of cash flows. For public business entities, the amendments in this standard 
are effective for annual periods beginning after December 15, 2016, and interim periods within those annual periods. 
Because of the Company’s current valuation allowance position, the adoption of this guidance, effective January 1, 2017, 
did not result in an adjustment to retained earnings as of December 31, 2016.  Nor did it result in current tax expense or 
benefit related to vested stock-based awards for the year ended December 31, 2017.  As a result, the Company did not 
exclude any excess tax benefits from the calculation of diluted earnings per share during the year ended December 31, 
2017, and there was no method change to the cash flow presentation as required by the guidance. Please see Note 5 for 
more information. 

Accounting Standards Update 2016-16 – Income Taxes, Intra-Entity Transfers of Assets Other Than Inventory 

(Topic 740).  In October 2016, the FASB issued guidance intended to improve the accounting for the income tax 
consequences of intra-entity transfers of assets other than inventory by requiring an entity to recognize the income tax 
consequences when a transfer occurs, instead of when an asset is sold to an outside party. The amendments in this 
guidance should be applied on a modified retrospective basis through a cumulative-effect adjustment directly to retained 
earnings as of the beginning of the period of adoption. The Company is required to adopt this new standard on January 1, 
2018, for its fiscal year 2018 and for interim periods within that fiscal year. Early adoption is permitted as of the 
beginning of an annual reporting period for which interim or annual financial statements have not been issued. The 
Company elected to early adopt this guidance as of January 1, 2017 which resulted in the Company adjusting its deferred 
tax charge, previously reported in other long-term assets, to nil with the related offset to beginning retained earnings.  
The net effect was a decrease of $0.5 million to other long-term assets and a corresponding decrease to beginning 
retained earnings. 

Recently Issued Accounting Standards Updates 

Accounting Standards Update No. 2014-09—Revenue from Contracts with Customers (Topic 606). On May 28, 

2014, the FASB issued guidance that requires an entity to recognize the amount of revenue to which it expects to be 
entitled for the transfer of promised goods or services to customers. This ASU was further amended in August 2015, 
March 2016, April 2016, May 2016 and December 2016 by ASU No. 2015-14, No. 2016-08, No. 2016-10, No. 2016-12 
and No. 2016-20, respectively.  The guidance provides a five-step approach to be applied to all contracts with customers 
and also requires expanded disclosures about revenue recognition.  

The Company has performed an assessment of the revised guidance and the impacts on the Company’s 

Consolidated Financial Statements and disclosures. The Company has completed the review of all contracts and 
determined that the adoption of this guidance will not impact the timing or the amounts of revenue recognized based on 
the Company’s determination of when control is transferred. Currently, revenue is recognized for contracts upon delivery 
of material to the customer and will not change under the new guidance. 

The Company completed its evaluation of variable consideration for concentrate sales related to the variable nature 

of the price and metal quantity. Based on its analysis, the estimate of revenue recognized for concentrates will remain 

61 

 
 
 
  
 
 
  
  
unchanged as sales will initially be recorded on a provisional basis based on the forward prices for the estimated month 
of settlement and the Company’s estimated metal quantities delivered based on weighing and assay data. The Company 
believes changes in the underlying weight and metal content are not significant to the sale and not probable of resulting 
in a material reversal of revenue as a whole and therefore do not preclude the recognition of revenue upon transfer of 
control. 

Additionally, the Company completed its evaluation of the impacts of refining fee classification.  The Company 

also determined that revenue will be recognized, net of treatment and refining charges, when these payments are made to 
customers. This classification remains unchanged from current practice. 

The Company will adopt the new guidance effective January 1, 2018. The guidance may be applied retrospectively 
for all periods presented or retrospectively with the cumulative effect of initially applying the guidance recognized at the 
date of initial application. The Company currently anticipates adopting the guidance retrospectively with the cumulative 
effect of initially applying the amended guidance recognized at January 1, 2018. As there are no changes to the 
Company’s current revenue recognition model, no changes will be made to prior period amounts or related prior period 
disclosures. 

Accounting Standards Update No. 2016-02 Leases (Topic 842). In February 2016, the FASB issued a new standard 

regarding leases. There are elements of the new standard that could impact almost all entities to some extent, although 
lessees will likely see the most significant changes. Lessees will need to recognize virtually all of their leases on the 
balance sheet, by recording a right-of-use asset and a lease liability. Public business entities are required to adopt the new 
leasing standard for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2018. For 
calendar year-end public companies, this means an adoption date of January 1, 2019. Early adoption is permitted. The 
Company is currently in the process of evaluating the impact on its consolidated financial statements and disclosures. 

2. Acquisitions 

Mina Gold Property 

On August 12, 2016, the Company acquired the Mina Gold property located in Mineral County, Nevada from 
Nevada Select Royalty Inc. (“Nevada Select”), a privately-held entity, for $1.0 million, which includes 130,169 shares of 
common stock valued at $0.9 million and cash of $0.1 million. The property consists of patented and unpatented mining 
claims. Nevada Select retained a net smelter return royalty (“NSR”) of 3% on the patented claims and a 2% NSR on the 
unpatented claims. The Company has the right to buy down 1% of the NSR on the patented claims for $1.0 million and 
0.5% of the NSR on the unpatented claims for $0.5 million. 

Isabella Pearl Project 

On August 12, 2016, the Company acquired all of the outstanding stock of Walker Lane, a privately-held entity, 

which owns the Isabella Pearl project located in Mineral County, Nevada, in exchange for 2,000,000 shares of the 
Company’s common stock valued at $13.1 million and cash of $0.2 million. The land position totals 341 unpatented 
mining claims, of which 58 claims encompass the Isabella Pearl deposit. The 58 Isabella Pearl claims along with 25 
additional claims have a 3% NSR, with the balance of the claims having a 1% NSR. 

In connection with the above two acquisitions, the Company incurred acquisition costs of $0.1 million. The 

transactions were accounted for as asset acquisitions and transaction costs were capitalized in accordance with U.S. 
GAAP. The assets and liabilities were recorded at the sum of the market value of the Company’s shares at the date of the 
transactions and cash consideration. The Walker Lane acquisition resulted in the Company recording $5.6 million of 
deferred tax liability related to the temporary book and tax differences in the basis of the property. 

The acquisition method requires the Company to determine the fair value of all acquired assets, including 

identifiable intangible assets, and all assumed liabilities. The total cost of acquisitions is allocated to the underlying 
identifiable net assets, based on their respective estimated fair values. Determining the fair value of assets acquired and 

62 

 
  
  
 
  
  
  
 
  
 
  
liabilities assumed requires management’s judgment and often involves the use of significant estimates and assumptions, 
including assumptions with respect to future cash inflows and outflows, discount rates, and asset lives, among other 
items. 

The preliminary allocation of the purchase price is based on management’s estimates at the time of closing and 

may be adjusted after obtaining additional information regarding, among other things, asset valuations, liabilities 
assumed and revisions of previous estimates. During 2017, the Company revised its temporary book and tax differences 
and as a result finalized the purchase price allocation.  The following table summarizes the final purchase price 
allocation: 

Purchase Price 
Preliminary allocation of purchase price: 
ASSETS 

Prepaid expenses and other current assets  
Mineral interests and mineral rights  
Other non-current assets  

Total assets 

LIABILITIES 

Deferred tax liability 
Reclamation and remediation liabilities 

Total liabilities 

Net fair value 

3. Gold and Silver Rounds/Bullion 

Preliminary 
Purchase 
Price 
Allocation   

Measurement 
Period 
Adjustments  
(in thousands) 

Final 
Purchase 
Price 
Allocation  

  $ 

 14,280   $ 

 -   $   14,280  

 $ 

 60   $ 

 -   $ 

 19,413  
 460  
 19,933  

 (4,155)  
 -  
 (4,155)  

 60  
 15,258  
 460  
 15,778  

 5,615  
 38  
 5,653  
14,280   $ 

$ 

 (4,155)  
 -  
 (4,155)  

 1,460  
 38  
 1,498  
 -   $  14,280  

The Company periodically purchases gold and silver bullion on the open market for investment purposes and to 

use in its dividend exchange program under which shareholders may exchange their cash dividends for minted gold and 
silver rounds. During the twelve months ended December 31, 2017 and 2016, the Company purchased 215.85 ounces 
and nil ounces, respectively, of gold bullion and 90 ounces and nil ounces, respectively, of silver bullion.  

At December 31, 2017 and 2016, the Company’s holdings of rounds/bullion, using quoted market prices, consisted 

of the following: 

Gold 
Silver 

Total holdings 

      Ounces 

      Per Ounce        Amount 

      Ounces 

      Per Ounce        Amount 

2017 

2016 

(in thousands) 
 1,830 
 1,477 
 3,307 

 $ 

 $ 

(in thousands)   
 2,459 
 1,353 
 3,812 

 $ 

 $ 

 1,579 
 90,971 

 $ 
 $ 

 1,159 
 16.24 

 1,905 
 80,224 

 $ 
 $ 

 1,291 
 16.87 

63 

 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
   
 
  
 
 
 
 
 
   
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
   
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
 
  
 
 
 
  
 
 
4. Current Inventories  

At December 31, 2017 and 2016, inventories consisted of the following:  

Stockpiles - underground mine 
Stockpiles - open pit mine 
Concentrates and doré 
Materials and supplies (1) 

Total 

(1)  Net of reserve for obsolescence of $743 and $637, respectively. 

5. Income Taxes  

Impact of New U.S. Tax Law 

2017 

2016 

(in thousands) 

  $ 

 1,450 
 101 
 2,367 
 7,718 
 $  11,636 

  $ 

 84 
 288 
 1,881 
 6,693 
  $   8,946 

On  December  22,  2017,  the  U.S.  government  enacted  comprehensive  tax  legislation  (the  “Tax  Act”),  which 
significantly revises the ongoing U.S. corporate income tax law by lowering the U.S. federal corporate income tax rate 
from  35%  to  21%,  implementing  a  territorial  tax  system,  imposing  a  one-time  tax  on  foreign  unremitted  earnings  and 
setting limitations on deductibility of certain costs, among other things. 

The Company is subject to the provisions of the Financial Accounting Standards Board (“FASB”) ASC 740-10, 
Income Taxes, which requires that the effect on deferred tax assets and liabilities of a change in tax rates be recognized 
in the period the tax rate change was enacted. Due to the complexities involved in accounting for the recently enacted 
Tax Act, the U.S. Securities and Exchange Commission’s Staff Accounting Bulletin (“SAB”) 118 requires that the 
Company include in its financial statements the reasonable estimate of the impact of the Tax Act on earnings to the 
extent such estimate has been determined. Accordingly, the Company recorded the following estimates of the tax impact 
in its earnings for the year ended December 31, 2017. 

a)  For the year ended December 31, 2017, the Company recorded an estimate of $4.6 million of tax expense for 
the Tax Act’s one-time transition tax on its foreign subsidiary’s accumulated, unremitted earnings from 
inception of the Company in 1998. 

b)  For the year ended December 31, 2017, the Company recorded $2.7 million in provisional tax expense related 
to the net change in deferred tax assets stemming from the Tax Act’s reduction of the U.S. federal tax rate 
from 35% to 21%. 

Pursuant to the SAB118, the Company is allowed a measurement period of up to one year after the enactment date 
of the Tax Act to finalize the recording of the related tax impacts. The final impact on the Company from the Tax Act’s 
transition tax legislation may differ from the aforementioned estimates due to the complexity of calculating and supporting 
with primary evidence such U.S. tax attributes such as  accumulated  foreign earnings and profits,  foreign tax paid, and 
other tax components involved in foreign tax credit calculations for prior years back to 1998. Such differences could be 
material, due to, among other things, changes in interpretations of the Tax Act, future legislative action to address questions 
that arise because of the Tax Act, changes in accounting standards for income taxes or related interpretations in response 
to the Tax Act, or any updates or changes to estimates the Company has utilized to calculate the transition tax's reasonable 
estimate.    The  Company  will  continue  to  evaluate  the  impact  of  the  U.S.  Tax  Act  and  will  record  any  resulting  tax 
adjustments during 2018. 

Based on our current estimate, the new tax legislation did not result in any cash payments as the Company was able 
to utilize foreign tax credits to offset the tax liability created by the one-time transition tax, and the Company does not 
expect any future cash implications.  However, should the estimate of the impact change in the future, the Company may 

64 

 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
   
   
   
   
   
   
 
 
 
 
 
 
 
 
 
elect  to  pay  any  transition  tax  in  installments  over the  period  of  8 years,  pursuant to the  guidance  of  the  new  Internal 
Revenue Code Section 965. 

Gold Resource Corporation and its U.S. subsidiaries file a consolidated U.S. tax return and the Company’s foreign 

subsidiary files in Mexico.  For financial reporting purposes, net income before income taxes includes the following 
components: 

U.S. Operations 
Foreign Operations, Mexico 

Total income before income taxes 

 $ 

$ 

 (8,142)    $ 
 36,620 
 28,478 

  $ 

 (7,001)    $ 
 16,147 
 9,146 

  $ 

 (10,389)  
 20,842  
 10,453  

The Company's income tax expense (benefit) from continuing operations consists of the following: 

2017 

Years Ended December 31,  
2016 
(in thousands) 

2015 

2017 

Years ended December 31,  
2016 
(in thousands) 

2015 

Current taxes: 

Federal 
State 
Foreign 

Total current taxes 

Deferred taxes: 

Federal 
State 
Foreign 

Total deferred taxes 
Total income tax provision 

 $ 

$ 

 $ 

$ 
  $ 

 9 
 - 
 9,327 
 9,336 

 4,923 
 - 
 10,069 
 14,992 
 24,328 

  $ 

  $ 

  $ 

  $ 
  $ 

 353 
 - 
 5,961 
 6,314 

  $ 

  $ 

 353  
 -  
 1,905  
 2,258  

 (1,715)    $ 
 - 
 160 
 (1,555)    $ 
  $ 
 4,759 

 (1,396)  
 -  
 6,529  
 5,133  
 7,391  

The provision for income taxes for the years ended December 31, 2017, 2016 and 2015, differs from the amount of 
income tax determined by applying the applicable United States statutory federal income tax rate to pre-tax income from 
operations as a result of the following differences: 

2017 

Years Ended December 31,  
2016 
(in thousands) 

2015 

Tax at statutory rates 
Foreign rate differential 
Dividends, net of foreign tax credits 
One-time tax on foreign unremitted earnings (Tax Act) 
Changes in deferred tax assets 
Mexico mining tax 
U.S. Tax rate reduction from 35% to 21% (Tax Act) 
Other 
Tax provision 

  $ 

  $ 

 9,967   $ 
 (1,780)  
 -  
 4,627  
 6,239  
 2,816  
 2,671  
 (212)  
 24,328   $ 

 3,110   $ 
 (617)  
 795  

 (625)  
 1,270  
 -  
 826  
 4,759   $ 

 3,554  
 (819)  
 267  

 2,600  
 1,103  
 -  
 686  
 7,391  

65 

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
  
   
   
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
 
 
 
  
   
   
  
   
   
 
 
 
 
     
     
  
   
     
     
  
  
   
   
  
   
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
   
 
 
   
 
 
   
   
 
   
 
   
 
 
   
 
 
   
 
 
   
 
 
 
The following table sets forth deferred tax assets and liabilities: 

At December 31,  

2017 

2016 

(in thousands) 

Non-current deferred tax assets: 
Tax loss carryforward - U.S. 
Property and equipment 
Stock-based compensation 
Foreign tax credits 
Other 

Total deferred tax assets 
Valuation allowance 

Deferred tax assets after valuation allowance 

Long-term deferred tax liability 

Net deferred tax asset 

Mexico Mining Taxation 

$ 

  $ 

  $ 

 1,450 
 1,935 
 4,622 
 4,185 
 2,284 
 14,476 
 (6,720)     
 7,756 

  $ 

 1,466 
 11,879 
 7,128 
 3,029 
 2,200 
 25,702 
 (2,507)   
 23,195 

 (902)     

 (5,615)  

  $ 

 6,854 

  $ 

 17,580  

Mining entities in Mexico are subject to two mining duties, in addition to the 30% Mexico corporate income tax: 

(i) a “special” mining duty of 7.5% of taxable income as defined under Mexican tax law (also referred to as “mining 
royalty tax”) on extracting activities performed by concession holders and (ii) the “extraordinary” mining duty of 0.5% 
on the gross revenue from the sale of gold, silver and platinum.  The mining royalty tax is generally applicable to 
earnings before income tax, depreciation, depletion, amortization, and interest.  In calculating the mining royalty tax, 
there are no deductions related to depreciable costs from operational fixed assets, but exploration and prospecting 
depreciable costs are deductible when incurred.  Both duties are tax deductible for income tax purposes. As a result, our 
effective tax rate applicable to the Company’s Mexican operations is substantially higher than Mexico statutory rate. 

Other Tax Disclosures 

The Company evaluates the evidence available to determine whether a valuation allowance is required on the 

deferred tax assets. The Company determined that the deferred tax assets related to the foreign tax credits, the state net 
operating loss carry forwards, and other state related deferred tax assets were not "more likely than not" to be realized 
and a full valuation allowance was recorded as of December 31, 2017.    

As a result of the adoption of ASU 2016-09 in the first quarter of 2017, excess tax benefits and tax deficiencies 
will be prospectively classified to the statement of operations instead of additional paid-in capital.  Upon adoption, the 
Company recorded a $4.2 million deferred tax asset related to previously unrecognized foreign tax credits but placed a 
valuation allowance against the full amount of the deferred tax asset due to the Company’s assessment of the realizability 
of these foreign tax credits.  Thus, no net impact to the financial statements was generated as a result of adoption of ASU 
2016-09. 

During the year ended December 31, 2017, the Company revised its temporary book and tax differences in the 

basis of its Isabella Pearl property, included in its Walker Lane Minerals Corp. acquisition which resulted in a $4.2 
million increase in deferred tax assets, net, and a corresponding decrease in property, plant and mine development. 

At December 31, 2017, the Company has U.S. tax loss carry-forward deferred tax assets approximating $1.5 
million, which expire between 2021 and 2037, and foreign tax credits of $4.2 million that expire between 2023 and 2026.  

During 2016 the Company concluded a tax examination by the Mexican tax authorities of the 2012 and 2013 

income tax returns with no adjustments to income taxes being recorded. 

66 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
  
 
 
 
 
   
 
 
 
 
 
 
 
  
   
 
  
   
 
  
   
 
  
   
 
   
   
 
  
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
As of both December 31, 2017 and 2016, the Company believes that it has no uncertain tax positions. If the 
Company were to determine there was an uncertain tax position, the Company would recognize the liability and related 
interest and penalties within income tax expense. 

6. Prepaid Expenses and Other Current Assets 

At December 31, 2017 and 2016, prepaid expenses and other current assets consisted of the following: 

2017 

2016 

(in thousands) 

Advances to suppliers 
Prepaid insurance 
Vendor deposits 
IVA taxes receivable, net 
Other current assets 

Total 

(1) 

  $ 

 163 
 869 
 501 
 - 
 234 
 1,767 

 $ 

  $ 

  $ 

 122 
 531 
 218 
 489 
 227 
 1,587 

7. Property, Plant and Mine Development, net 

At December 31, 2017 and 2016, property, plant and mine development consisted of the following:  

Asset retirement costs 
Construction-in-progress 
Furniture and office equipment 
Land 
Light vehicles and other mobile equipment 
Machinery and equipment 
Mill facilities and infrastructure 
Mineral interests and mineral rights (1) 
Mine development 
Software and licenses 

Subtotal (2) (3) 

Accumulated depreciation and amortization 

Total 

2017 

2016 

(in thousands) 

  $ 

  $ 

 1,079 
 10,838 
 1,664 
 242 
 2,211 
 22,916 
 10,075 
 17,658 
 56,957 
 1,678 
 125,318 
 (42,719) 
 82,599 

  $ 

  $ 

 637 
 586 
 1,580 
 230 
 1,914 
 20,293 
 9,643 
 19,413 
 42,951 
 1,624 
 98,871 
 (28,812) 
 70,059 

(2) 

(1)  During the year ended December 31, 2017, the Company revised its temporary book and tax differences in the basis of its Isabella Pearl property, 
which resulted in a $4.2 million decrease in property, plant and mine development, net and a corresponding increase in deferred tax assets, net. 
Includes $1.6 million and nil of assets recorded under capital leases at December 31, 2017 and 2016. Please see Note 11 for additional 
information. 
Includes accrued capital expenditures of $1.0 million and nil at December 31, 2017 and 2016, respectively.  

(3) 

The Company recorded depreciation and amortization expense for years ended December 31, 2017, 2016 and 2015 

of $15.0 million, $12.6 million and $9.1 million, respectively. 

67 

 
 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
   
   
   
   
   
   
   
   
 
 
 
  
 
 
 
 
 
 
 
     
     
 
 
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
 
8. Accrued Expenses and Other Current Liabilities 

At December 31, 2017 and 2016, accrued expenses and other current liabilities consisted of the following: 

Accrued insurance 
Accrued royalty payments 
Dividends payable 
IVA taxes payable, net 
Other payables 
Total 

9. Reclamation and Remediation 

2017 

2016 

(in thousands) 

  $ 

 662 
 1,805 
 95 
 274 
 15 
 $   2,851 

  $ 

 381 
 1,043 
 94 
 - 
 8 
  $   1,526 

The following table presents the changes in the Company’s reclamation and remediation obligations for the years 

ended December 31, 2017 and 2016: 

Reclamation liabilities – balance at beginning of period 
Changes in estimate 
Foreign currency exchange loss (gain) 

Reclamation liabilities – balance at end of period 

Asset retirement obligation – balance at beginning of period 
Changes in estimate 
Accretion expense 
Foreign currency exchange loss (gain) 

Asset retirement obligation – balance at end of period 
Total period end balance 

2017 

2016 

(in thousands) 

  $   1,907 
 10 
 88 
 2,005 

  $   2,192 
 82 
 (367) 
 1,907 

 518 
 366 
 35 
 22 
 941 
$   2,946 

 623 
 (21) 
 23 
 (107) 
 518 
  $   2,425 

The Company’s reclamation and remediation obligations as of December 31, 2017 and 2016 were discounted 

using a discount rate of 8%. 

10. Loan Payable 

On August 8, 2017, the Company entered into a 48-month loan agreement in the amount of $2.4 million for the 

purchase of certain equipment.  The loan bears annual interest of 4.48%, is collateralized by the equipment, and requires 
monthly principal and interest payments of $0.05 million.  As of December 31, 2017, there is an outstanding balance of 
$2.2 million.  Scheduled minimum repayments are $0.6 million in 2018, $0.6 million in 2019, $0.6 million in 2020, and 
$0.4 million in 2021. The Company is subject to a prepayment penalty, ranging from 1% to 3% of the outstanding loan 
balance at time of full repayment, depending on time of repayment.  

68 

 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
   
   
   
   
   
   
   
   
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
   
   
   
   
 
 
   
 
 
 
 
   
 
   
   
   
   
   
   
   
   
 
 
   
 
 
 
 
 
 
 
 
11. Capital Lease 

On November 13, 2017, the Company entered into a 48-month capital lease agreement in the amount of $1.6 
million for certain equipment.  The lease bears annual imputed interest of 5.95% and requires monthly principal, interest, 
and sales tax payments of $0.04 million.  Scheduled minimum annual payments as of December 31, 2017 are as follows 
(in thousands): 

Year Ending December 31: 
2018 
2019 
2020 
2021 
Total minimum obligations 
Interest portion 
Present value of net minimum payments 
Less: current portion 
Non-current portion 

12. Commitments and Contingencies 

Operating leases 

$ 

$ 

 461 
 461 
 461 
 397 
 1,780 
 (180) 
 1,600 
 (382) 
 1,218 

The Company leases its office in Colorado Springs from a related party under a non-cancelable operating lease 
which expires in 2018. The Company also leases an office in Denver, Colorado consisting of approximately 2,500 square 
feet, which was renewed in 2015 for three years.  The Company’s Mexican subsidiary leases office space in Oaxaca 
City, Oaxaca. The subsidiary entered into a ten-year lease commencing January 1, 2012.  Future minimum lease 
payments under operating leases are as follows: 

Payments due by Period 

Total 

2018 

2019 
(in thousands) 

2020 

2022 and 
Thereafter 

2021 

Operating leases 

 $  397 

 $  164 

 $  87 

 $  74 

 $  72 

 $ 

 - 

Other Commitments 

As of December 31, 2017, the Company has equipment purchase commitments aggregating approximately $3.8 million. 

13. Shareholders’ Equity  

The Company declared and paid dividends of $1.1 million during the year ended December 31, 2017. During the 

year ended December 31, 2016, the Company declared and paid dividends of $1.7 million. During the year ended 
December 31, 2015, the Company declared dividends of $6.1 million and paid dividends of $6.5 million.   

On January 6, 2017, the Company issued 59,642 shares of common stock as partial consideration for additional 

mineral rights for its Isabella Pearl project. At the time of issuance, the shares were valued at $5.03 per share, for an 
aggregate value of $0.3 million. 

On January 17, 2017, the Company issued 186,568 shares of common stock as partial consideration for mineral 

rights at the East Camp Douglas property.  At the time of issuance, the shares were valued at $5.36 per share, for an 
aggregate value of $1.0 million. 

69 

 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
  
 
During the year ended December 31, 2016, the Company issued 130,169 shares of common stock as 

partial consideration for mineral rights at the Mina Gold property.  At the time of issuance, the shares were valued at 
$6.53 per share, for an aggregate value of $0.9 million.  Please see Note 2 for more information. 

During the year ended December 31, 2016, the Company issued 2,000,000 shares of common stock as partial 

consideration for its acquisition of Walker Lane.  Please see Note 2 for more information. 

In 2011, the Board of Directors approved a share repurchase program pursuant to which the Company may 
repurchase up to $20.0 million of its common stock from time to time in market transactions. There is no pre-determined 
end date associated with the share repurchase program. During 2017, 2016 and 2015, the Company did not repurchase 
any additional shares of common stock. 

14. Embedded Derivatives 

Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for unsettled 
shipments. At the end of each reporting period, the Company records an adjustment to accounts receivable and revenue 
to reflect the mark-to-market adjustments for outstanding provisional invoices based on metal forward prices. Please 
see Note 19 for additional information. 

The following table summarizes the Company’s unsettled sales contracts at December 31, 2017, with the quantities 

of metals under contract subject to final pricing occurring through February 2018: 

Gold  
(ounces)   
 9,434  

      Silver 

(ounces)  
 706,199  

  Copper   
(tonnes)   
 437  

Lead 
(tonnes)   
 2,148  

Zinc 
(tonnes) 
 6,490 

$ 

 1,286  

$ 

 16.87  

$ 

 6,754 

$ 

 2,462 

$ 

 3,057 

Under contract 
Average forward (price per ounce or 

tonne) 

15. Employee Benefits 

401(k) Plan 

Effective October 2012, the Company adopted a profit sharing plan (the “Plan”) which covers all U.S. employees. 

The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the 
Internal Revenue Code. The Plan provides eligible employees the opportunity to make tax deferred contributions to a 
retirement trust account up to 45% of their qualified wages, subject to the IRS annual maximums. Any matching 
contribution by the Company on behalf of the employee is immediately vested; the matching contribution expense 
amounted to $0.1 million in 2017, $0.1 million in 2016 and $0.2 million in 2015. The unfunded matching contribution 
obligation was nil for the year ended December 31, 2017.  

16. Stock-Based Compensation  

During 2016, the Company replaced its Amended and Restated Stock Option and Stock Grant Plan (the “Prior 

Plan”) with the Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”).  The Incentive Plan 
provides for the issuance of five million shares of common stock in the form of incentive and non-qualified stock 
options, stock appreciation rights, RSUs, stock grants, stock units, performance shares, performance share units and 
performance cash.  Additionally, pursuant to the terms of the Incentive Plan, any award outstanding under the Prior Plan 
that is terminated, expired, forfeited, or canceled for any reason, will be available for grant under the Incentive Plan. 

A total of 416,000 options with a term of 10 years were granted during the year ended December 31, 2017, of 
which 37,000 vested immediately and the remainder vest over a three-year period. A total of 105,945 RSUs were granted 
during the year ended December 31, 2017, of which 14,964 vest within six months and the remainder vest over a three- 
year period. 

70 

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
Stock Options 

A summary of stock option activity under the Incentive Plan for the years ended December 31, 2017 and 2016 is 

presented below: 

Outstanding as of December 31, 2015 

Granted 
Exercised 
Expired 
Forfeited 

Outstanding as of December 31, 2016 

Granted 
Exercised 
Expired 
Forfeited 

Outstanding as of December 31, 2017 

Shares 
 5,550,000 
 717,000 
 (169,999)   

 - 

 (48,000)   

 6,049,001  
  416,000 
  (25,000) 
  (195,000) 
 - 
 6,245,001  

Vested and exercisable as of December 31, 2017 

 5,181,995  

$ 

$ 

$ 

Weighted 
Average Exercise 
Price (per share)      
 $ 

Weighted Average 
Remaining 
Contractual Term 
(in years) 

 5.10 
 - 
 - 
 - 
 - 
 5.36  
 - 
 - 
 - 
 -  
 4.68  

 3.87  

Aggregate 
Intrinsic 
Value 
(thousands)    
 -  
 $ 

$ 

 3,963  

$ 

$ 

 4,040  

 3,035  

 7.75  
 3.85  
 2.30  
 -  
 3.16  
 7.48  
 4.08  
 2.30 
 8.99 
 -  
 7.23  

 7.99  

The weighted-average fair value of options granted during the years ended December 31, 2017, 2016, and 2015 

was $2.25, $1.96 and $0.78, respectively. The total intrinsic value of options exercised during the years ended 
December 31, 2017 and 2016, was $0.1 million and $0.6 million, respectively. There were no options exercised during 
the year ended December 31, 2015. The total fair value of options vested during the years ended December 31, 2017, 
2016 and 2015 was $0.8 million, $1.3 million and $4.7 million, respectively. 

The Company received nil and $0.4 million in cash proceeds from options exercised during 2017 and 2016, 

respectively.  

The following table summarizes information about stock options outstanding at December 31, 2017: 

Range of Exercise Prices 

$0.00 - $6.25 
$6.25 -$12.50 
$12.50 - $18.75 
$18.75 - $25.00 

Outstanding 
Weighted Average 
Remaining 
Contractual Term 
(in years) 

 4.67 
 4.56 
 4.77 
 4.68 
 4.68  

Number of 
Option 
 3,975,001 
 810,000 
 1,340,000 
 120,000 
 6,245,001 

Exercisable 

Weighted 
Average Exercise 
Price (per share)      
 $ 
 $ 
 $ 
 $ 
$ 

 3.41  
 8.75  
 16.46  
 20.51  
 7.23 

Number of 
Options 
 2,911,995 
 810,000 
 1,340,000 
 120,000 
 5,181,995  

Weighted 
Average Exercise 
Price (per share)   
 3.37  
 $ 
 8.75  
 $ 
 16.46  
 $ 
 20.51  
 $ 
 7.99  
$ 

The assumptions used to determine the value of stock-based awards under the Black-Scholes method are summarized 
below: 

2017 

Year ended December 31,  
2016 

2015 

Risk-free interest rate 
Dividend yield 
Expected volatility 
Expected life in years 

 0.87 % 
 0.46 % 
 62.74 % 
 5 

1.03 %     
 5.2 %     
 58.79 %     
5 

 1.94 % 
 0.53 % 
 67.70 % 
 5 

71 

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
  
  
 
 
  
  
 
 
 
  
  
 
 
  
  
 
   
  
  
  
 
  
  
  
 
  
  
 
  
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
     
 
 
 
 
 
 
 
 
 
 
Restricted Stock Units 

A summary of RSU activity under the Incentive Plan for the years ended December 31, 2017 and 2016 is 

presented below: 

Nonvested as of December 31, 2015 

Granted 
Vested 
Expired 
Forfeited 

Nonvested as of December 31, 2016 

Granted 
Vested 
Expired 
Forfeited 

Nonvested as of December 31, 2017 

Weighted 
Average Exercise 
Price (per share)      
 $ 

Weighted Average 
Remaining 
Contractual Term 
(in years) 

 - 
 - 
 - 
 - 
 - 
 1.82  
 - 
 - 
 - 
 -  
 1.91  

Aggregate 
Intrinsic 
Value 
(thousands)   
 -  
 $ 

$ 

 791  

$ 

 920  

 -  
 -  
 -  
 -  
 -  
 -  
 -  
 - 
 - 
 -  
 -  

Shares 

 - 
 188,803 
 - 
 - 

 (7,065)   

 181,738  
  105,945 
  (78,400) 
 - 
 - 
 209,283  

$ 

$ 

The weighted-average fair value of RSUs granted during the years ended December 31, 2017 and 2016, was $4.11 
and $4.60, respectively.  There were no RSUs granted in 2015. The total intrinsic value of RSUs vested during the years 
ended December 31, 2017, 2016, and 2015 was $0.3 million, nil and nil, respectively. 

Stock-Based Compensation Expense 

Stock-based compensation expense for stock options and RSUs is as follows: 

Stock options 
Restricted stock units 

Total 

2017 

Year ended December 31,  
2016 
(in thousands) 

2015 

$ 

$ 

 829  
 363  
 1,192  

$ 

$ 

 1,036   
 204   
 1,240   

$ 

$ 

 3,472  
 -  
 3,472  

Total stock-based compensation related to stock options and RSUs has been allocated between production costs, 

general and administrative expenses, and exploration expense as follows: 

Production costs  
General and administrative expenses 
Exploration expense 
Total 

2017 

Year ended December 31,  
2016 
(in thousands) 

2015 

$ 

$ 

 99  
 1,029  
 64   
 1,192  

$ 

$ 

 186  
 1,040  
 14   
 1,240  

$ 

$ 

 1,073 
 2,399 
 - 
 3,472 

The estimated unrecognized stock-based compensation expense from unvested options and RSUs as of 

December 31, 2017 was approximately $2.2 million and $1.1 million, respectively, and is expected to be recognized over 
the remaining vesting periods of up to three years.  

72 

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
  
  
 
 
 
  
  
 
 
 
  
  
 
 
  
  
 
   
  
  
  
 
  
  
 
  
 
  
  
 
  
 
  
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
17. Other Expense (Income), Net 

During the years ended December 31, 2017, 2016 and 2015, other expense (income) consisted of the following: 

2017 

Year ended December 31,  
2016 
(in thousands) 

2015 

Unrealized currency exchange loss (gain) 
Realized currency exchange (gain) loss 
Unrealized (gain) loss from gold and silver rounds/bullion, net (1) 
(Gain) loss from sale of investments, net (1) 
Loss on disposal of fixed assets 
Gain on insurance reimbursement 
Increase (decrease) in reserve for inventory obsolescence 
Other expense   

Total 

  $ 

$ 

 983 
 (457) 
 (493) 
 - 
 474 
 - 
 106 
 553 
 1,166 

 $ 

 $ 

 (267) 
 (261) 
 (411) 
 (348) 
 578 
 (620) 
 545 
 224 
 (560) 

 $ 

 $ 

 (256) 
 246 
 420 
 1,989 
 144 
 - 
 (125) 
 48 
 2,466 

(1)  Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. During 2016, 
the Company sold its current investment in equity and realized a gain of $348.  For additional information regarding our fair value measurements 
and investments, please see Note 19. 

18. Net Income per Common Share 

Basic earnings per common share is calculated based on the weighted average number of common shares 
outstanding for the period. Diluted earnings per common share is calculated based on the assumption that stock options 
outstanding, which have an exercise price less than the average market price of the Company’s common shares during 
the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds 
obtained from the exercise were used to purchase common shares at the average market price during the period. All the 
Company’s restricted stock units are considered to be dilutive. 

The effect of the Company’s dilutive securities is calculated using the treasury stock method and only those 

instruments that result in a reduction in net income per common share are included in the calculation. Options to 
purchase 3.1 million, 2.8 million, and 4.3 million shares of common stock at weighted average exercise prices of $11.26, 
$12.39, and $9.34 were outstanding as of December 31, 2017, 2016, and 2015, respectively, but were not included in the 
computation of diluted weighted average common shares outstanding, as the exercise price of the options exceeded the 
average price of the Company’s common stock during those periods, and therefore were anti-dilutive. 

Basic and diluted net income per common share is calculated as follows: 

Net income (in thousands) 
Basic weighted average shares of common stock outstanding 
Dilutive effect of share-based awards 
Diluted weighted average common shares outstanding 
Net income per share: 
Basic and diluted 

Year ended December 31,  
2016 

2017 

2015 

$ 

 4,150  
 56,854,670  
 740,323  
 57,594,993  

$ 

 4,387  
 55,140,237  
 584,969  
 55,725,206  

$ 

 3,062   
  54,186,547   
 72,765   
 54,259,312   

 $ 

 0.07  

$ 

 0.08  

$ 

0.06   

73 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
 
 
 
 
  
  
 
 
   
   
 
 
   
   
 
 
   
   
 
 
   
   
 
 
   
   
 
 
   
   
 
 
 
 
 
 
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
19. Fair Value Measurement  

Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to 
measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical 
assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The 
three levels of the fair value hierarchy are described below:  

Level 1  Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, 

unrestricted assets or liabilities;  

Level 2  Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for 

substantially the full term of the asset or liability; and  

Level 3  Prices or valuation techniques that require inputs that are both significant to the fair value measurement and 

unobservable (supported by little or no market activity.)  

As required by accounting guidance, assets are classified in their entirety based on the lowest level of input that is 
significant to the fair value measurement. The following tables set forth certain of the Company’s assets measured at fair 
value by level within the fair value hierarchy as of December 31, 2017 and 2016:   

Cash and cash equivalents: 

Bank deposits 

Gold and silver rounds/bullion 
Accounts receivable: 

Receivables from provisional concentrate sales 

      2017 

      2016 

     Input Hierarchy Level 

(in thousands) 

  $  22,390    $  14,166    Level 1 
 3,307    Level 1 

 3,812     

 2,884     

 630    Level 2 

  $  29,086   $  18,103  

Cash and cash equivalents consist primarily of cash deposits and are valued at cost, which approximates fair value. 

Gold and silver rounds/bullion consist of precious metals used for investment purposes and in the dividend program 
which are valued using quoted market prices. Please see Note 3 for additional information. The Company determined 
that it was not practicable to estimate the fair value of its non-current investment in equity securities of $0.2 million and 
as such, it is reported at cost.  There have been no events or changes in circumstances that may have a significant adverse 
effect on the investment. 

Trade accounts receivable include amounts due to the Company for shipments of concentrates and doré sold to 

customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain 
an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a 
derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market 
of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not 
yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts 
receivable as of each reporting date. Please see Note 14 for additional information. 

74 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
   
 
 
 
 
     
     
 
 
 
 
 
  
 
Gains and losses related to changes in the fair value of these financial instruments were included in the Company’s 

consolidated statements of operations as shown in the following table: 

Year ended December 31,  

Derivative gain 
Gold and silver rounds/bullion (gain) loss  
Investment (gain) loss  

$ 
$ 
$ 

20. Supplementary Cash Flow Information 

2017 

2016 
(in thousands) 
  $ 
 473 
 (411)    $ 
$ 
 (351)  

  $ 
 1,364 
 (282)    $ 
$ 
 -  

2015 

Statement of 
Income Classification 

 463 
 420 

  Sales, net 
  Other expense (income), net 
 1,989   Other expense (income), net 

During the years ended December 31, 2017, 2016, and 2015, other operating adjustments and write-downs within 

the net cash provided by operations on the statement of cash flows consisted of the following:  

Unrealized (gain) loss on gold and silver rounds/bullion 
Unrealized foreign currency exchange loss (gain) 
Unrealized loss on equity investments 
Gain on sale of investments 
Loss on disposition of fixed assets 
Deferred charge 
Increase (decrease) in reserve for inventory obsolescence 
Other 

Total other operating adjustments 

21. Segment Reporting 

2017 

 (493) 
 983 
 - 
 - 
 474 
 - 
 106 
 215 
 1,285 

2016 
(in thousands) 
 (411) 
 $ 
 (267) 
 - 
 (348) 
 578 
 - 
 545 
 201 
 298 

 $ 

 $ 

 $ 

2015 

 420 
 (256) 
 1,989 
 - 
 144 
 86 
 (125) 
 616 
 2,874 

  $ 

$ 

The Company has organized its operations into two geographic regions. The geographic regions include Oaxaca, 

Mexico and Nevada, U.S.A. and represent the Company’s operating segments. During the first quarter of 2017, the 
Company made decisions about resources to be allocated to the operating segments. As a result, these operating 
segments represent the Company’s reportable segments. The 2017 and 2016 segment information is also presented 
below.  Operations in Nevada during 2015 were neither significant or material and as such the segment information is 
not presented.   

75 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
     
     
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
     
 
 
 
   
  
  
   
  
  
   
  
  
   
  
  
   
  
  
   
  
  
 
 
   
   
 
 
 
 
  
 
 
The financial information relating to the Company’s segments is as follows (in thousands): 

Year ended December 31, 2017 
Revenue 
Exploration expense 
Net income (loss) 
Capital expenditures (1) 

Year ended December 31, 2016 
Revenue 
Exploration expense 
Net income (loss) 
Capital expenditures (2) 

  $ 

  $ 

Mexico 

Nevada 

  Corporate and Other  

Consolidated 

 110,156   $ 
 1,288  
 20,379  
 21,760  

 -   $ 

 -   $ 

 2,916  
 (2,423)  
 10,087  

 145  
 (13,806)  
 9  

 110,156 
 4,349 
 4,150 
 31,856 

Mexico 

Nevada 

  Corporate and Other  

Consolidated 

 83,227   $ 
 1,992  
 14,705  
 12,356  

 -   $ 

 -   $ 

 2,057  
 (1,292)  
 13,956  

 265  
 (9,026)  
 170  

 83,227 
 4,314 
 4,387 
 26,482 

(1) 

(2) 

Includes an increase in accrued capital expenditures of $1,041 and non-cash additions of $5,383; consolidated capital expenditures on a cash basis 
were $25,432. 
Includes a decrease in accrued capital expenditures of $2,868 and non-cash additions of $14,210; consolidated capital expenditures on a cash 
basis were $15,140. 

Total asset balances, excluding intercompany balances at December 31, 2017 and December 31, 2016 are as 

follows: 

Mexico 
Nevada 
Corporate and Other 
Consolidated 

2017 

2016 

(in thousands) 

 87,739 
 25,741 
 19,443 
 132,923 

 $ 

 $ 

 79,677 
 15,122 
 23,644 
 118,443 

 $ 

 $ 

22. Quarterly Financial Data (Unaudited)  

The following represents selected information from the unaudited quarterly consolidated statements of operations 

for the years ended December 31, 2017 and 2016: 

Sales, net 
Mine gross profit 
Net income (loss) 
Net income (loss) per common share: 

Basic and diluted 

Weighted average shares outstanding: 

Basic  
Diluted 

2017 
     First Quarter      Second Quarter      Third Quarter      Fourth Quarter   
(in thousands, except per common share data) 

  $ 
  $ 
  $ 

 24,336   $ 
 10,416   $ 
 4,376   $ 

 21,391   $ 
 5,226   $ 
 864   $ 

 31,122   $ 
 11,201   $ 
 4,581   $ 

 33,307  
 15,272  
 (5,671)  

 $ 

 0.08   $ 

 0.02   $ 

 0.08   $ 

 (0.11)  

 56,796,751  
 57,991,663  

 56,839,823  
 57,375,938  

 56,888,115  
 57,455,805  

 56,892,583  
 57,452,314  

76 

 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
     
 
  
 
 
 
 
 
 
 
     
     
 
 
  
  
  
  
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
 
 
 
 
Sales, net 
Mine gross profit 
Net income (loss) 
Net income (loss) per common share: 

Basic and diluted 

Weighted average shares outstanding: 

Basic  
Diluted 

2016 
     First Quarter      Second Quarter      Third Quarter      Fourth Quarter   
(in thousands, except per common share data) 

  $ 
  $ 
  $ 

 17,403   $ 
 3,454   $ 
 797   $ 

 26,198   $ 
 12,393   $ 
 5,608   $ 

 21,367   $ 
 5,363   $ 
 1,594   $ 

 18,259  
 1,223  
 (3,612)  

 $ 

 0.01   $ 

 0.10   $ 

 0.03   $ 

 (0.06)  

 54,266,706  
 54,266,706  

 54,266,706  
 54,670,594  

 55,781,382  
 57,597,392  

 56,566,874  
 57,732,284  

During the fourth quarter of the year ended December 31, 2017, the Company made adjustments to provision for income 
taxes which had a significant effect on the full year’s results.  Please see Note 5 for more information. 

ITEM 9.    CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND 

FINANCIAL DISCLOSURE  

On March 23, 2016, our Audit Committee dismissed KPMG LLP and engaged EKS&H LLLP to serve as our 
independent registered public accounting firm for the fiscal year ending December 31, 2016. The audit reports of KPMG 
LLP on our consolidated financial statements as of and for the year ended December 31, 2015, did not contain any 
adverse opinion or disclaimer of opinion, nor were they qualified or modified as to uncertainty, audit scope, or 
accounting principles. During the fiscal year ended December 31, 2015, and in the interim period up to March 23, 2016, 
there were no (1) disagreements between us and KPMG LLP on any matter of accounting principles or practices, 
financial statement disclosure, or auditing scope or procedures, which disagreements if not resolved to their satisfaction 
would have caused them to make reference thereto in their reports on the consolidated financial statements for such 
years, or (2) “reportable events” as that term is defined in Item 304(a)(1)(v) of Regulation S-K. 

During the fiscal year ended December 31, 2015, and in the interim period up to March 23, 2016, we have not 
consulted with EKS&H LLLP regarding either (1) the application of accounting principles to a specified transaction, 
either completed or proposed, or the type of audit opinion that might be rendered on our consolidated financial 
statements, and no written report or oral advice was provided by EKS&H LLLP to us that was an important factor 
considered by us in reaching a decision as to any accounting, auditing or financial reporting issue; or (2) any matter that 
was the subject of a disagreement (as that term is defined in Item 304(a)(1)(iv) of Regulation S-K and related 
instructions) or a “reportable event” (as that term is defined in Item 304(a)(1)(v) of Regulation S-K).  

ITEM 9A. 

CONTROLS AND PROCEDURES  

Evaluation of Disclosure Controls and Procedures 

Our disclosure controls and procedures are designed to ensure that information required to be disclosed in the 
reports that we file under the Securities Exchange Act of 1934, as amended (the "Exchange Act") is recorded, processed, 
summarized and reported within the time periods specified in the rules and forms of the Securities and Exchange 
Commission, and that such information is accumulated and communicated to our management, including our Chief 
Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. 
The Chief Executive Officer and the Chief Financial Officer, with assistance from management, have evaluated the 
effectiveness of disclosure controls and procedures as of December 31, 2017. Based on that evaluation, the Chief 
Executive Officer and the Chief Financial Officer have concluded that our disclosure controls and procedures were 
effective as of December 31, 2017. 

Management's Report on Internal Control over Financial Reporting  

Management is responsible for establishing and maintaining adequate internal control over financial reporting and 

77 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
for the assessment of the effectiveness of internal control over financial reporting as defined in Rules 13a-15(f) and 15d-
15(f) under the Exchange Act. Management assessed the effectiveness of the Company’s internal control over financial 
reporting as of December 31, 2017, based on the framework set forth by the Committee of Sponsoring Organizations of 
the Treadway Commission (“COSO”) in Internal Control-Integrated Framework (2013). Based on this assessment, 
management concluded that our internal control over financial reporting as of December 31, 2017, was effective.  

EKS&H LLLP, an independent registered public accounting firm, has audited the consolidated financial 
statements included in this Annual Report on Form 10-K and, as part of its audit, has issued an opinion on the 
effectiveness of our internal control over financial reporting which is included as part of Item 8. Financial Statements 
and Supplementary Data. 

Changes in Internal Control over Financial Reporting 

There has been no change in our internal control over financial reporting during the fourth quarter ended 
December 31, 2017 that has materially affected, or is reasonably likely to materially affect, our internal control over 
financial reporting.   

ITEM 9B.  OTHER INFORMATION 

None. 

Item 10. Directors, Executive Officers, and Corporate Governance  

PART III 

The information required by this item is incorporated by reference from the information to be contained in our 
Proxy Statement for the 2018 Annual Meeting of Shareholders (“2018 Proxy Statement”) expected to be filed within 120 
days after the end of our fiscal year ended December 31, 2017.  

Item 11. Executive Compensation  

The information required by this item is incorporated by reference from the information to be contained in our 

2018 Proxy Statement.  

Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters  

The information required by this item is incorporated by reference from the information to be contained in our 

2018 Proxy Statement.  

Item 13. Certain Relationships and Related Transactions and Director Independence  

The information required by this item is incorporated by reference from the information to be contained in our 

2018 Proxy Statement.  

Item 14. Principal Accountant Fees and Services  

The information required by this item is incorporated by reference from the information to be contained in our 

2018 Proxy Statement.  

78 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PART IV 

ITEM 15.          EXHIBITS, FINANCIAL STATEMENT SCHEDULES 

The following exhibits are filed with or incorporated by referenced in this report: 

Item No. 

Description 

3.1 

3.1.1 

3.1.2 

3.2 

3.2.1 

10.1 

10.2 

10.3 

10.4 

10.5 

10.6 

10.7 

10.8 

Articles of Incorporation of the Company as filed with the Colorado Secretary of State on August 24, 
1998 (incorporated by reference from our registration statement on Form SB-2 filed on October 28, 
2005, Exhibit 3.1, File No. 333-129321). 

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on 
September 16, 2005 (incorporated by reference from our registration statement on Form SB-2 filed on 
October 28, 2005, Exhibit 3.1.1, File No. 333-129321). 

Articles of Amendment to the Articles of Incorporation as filed with the Colorado Secretary of State on 
November 8, 2010 (incorporated by reference from our quarterly report on Form 10-Q filed on 
November 10, 2010, Exhibit 3.1, File No. 001-34857). 

Amended and Restated Bylaws of the Company dated August 9, 2010 (incorporated by reference from 
our current report on Form 8-K filed on August 12, 2010, Exhibit 3.2, File No. 333-129321). 

Amendment dated March 25, 2013 to Amended and Restated Bylaws of the Company dated August 9, 
2010 (incorporated by reference from our current report on Form 8-K filed on March 27, 2013, Exhibit 
3.2, File No. 001-34857). 

Exploitation and Exploration Agreement between the Company and Jose Perez Reynoso dated October 
14, 2002 (incorporated by reference from our registration statement on Form SB-2 filed on October 28, 
2005, Exhibit 10.1, File No. 333-129321). 

Mining Exploration and Exploitation Agreement between Don David Gold, S.A. de C.V. and Jose 
Perez Reynoso effective November 21, 2002 (incorporated by reference from our quarterly report on 
Form 10-Q filed on August 9, 2012, Exhibit 10.15, File No. 001-34857). 

Amendment to Mining Exploration and Exploitation Agreement between Don David Gold Mexico, 
S.A. de C.V. and Jose Perez Reynoso effective August 3, 2012 (incorporated by reference from our 
quarterly report on Form 10-Q filed on August 9, 2012, Exhibit 10.17, File No. 001-34857). 

Gold Resource Corporation 2016 Equity Incentive Plan (incorporated by reference from our 
registration statement on Form S-8 filed on December 7, 2016, Exhibit 4.1, File No. 333-214958). 

Form of Stock Option Agreement (incorporated by reference from our annual report on Form 10-K 
filed February 28, 2017, Exhibit 10.5, File No. 001-34857). 

Form of RSU Agreement (incorporated by reference from our annual report on Form 10-K filed 
February 28, 2017, Exhibit 10.6, File No. 001-34857). 

Office Lease between Don David Gold Mexico, S.A. de C.V. and Immobilaria & Construcciones Stipa 
S.A. de C.V. effective January 1, 2012 (incorporated by reference from our annual report on Form 10-
K filed March 18, 2013, Exhibit 10.28, File No. 001-34857). 

Office Lease between the Company and Lincoln ASB Colorado Center LLC effective November 1, 
2012 (incorporated by reference from our annual report on Form 10-K filed March 18, 2013, Exhibit 
10.29, File No. 001-34857). 

79 

 
 
 
 
 
 
 
 
  
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10.9 

10.10 

10.11 

10.12 

10.13 

Amendment No. 1 to Office Lease between the Company and Lincoln ASB Colorado Center LLC 
dated August 26, 2015 (incorporated by reference from our annual report on Form 10-K filed March 9, 
2016, Exhibit 10.19, File No. 001-34857). 

Form of Executive Employment Agreement between the Company and its executive officers including 
its Principal Executive Officer and Principal Financial Officer (incorporated by reference from our 
current report on Form 8-K filed on December 29, 2017, Exhibit 10.1, File No. 001-34857). 

Form of Indemnification Agreement between the Company and its directors and officers (incorporated 
by reference from our current report on Form 8-K filed on December 18, 2013, Exhibit 10.1, File No. 
001-34857). 

Consulting Agreement between the Company and William Reid (incorporated by reference from our 
current report on Form 8-K filed on February 6, 2014, Exhibit 10.1, File No. 001-34857). 

Amendment to Consulting Agreement between the Company and William Reid effective January 1, 
2015 (incorporated by reference from our annual report on Form 10-K filed on March 20, 2015, 
Exhibit 10.20, File No. 001-34857). 

10.14* 

Policy for Recoupment of Executive Compensation. 

21* 

Subsidiaries of the Company. 

23.1* 

Consent of KPMG LLP, Independent Registered Public Accounting Firm. 

23.2* 

Consent of EKS&H, LLLP, Independent Registered Public Accounting Firm. 

31.1* 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid. 

31.2* 

Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for John A. Labate. 

32* 

101* 

Certification pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 for Jason D. Reid and John A. 
Labate. 

The following financial statements from the Annual Report on Form 10-K for the year ended 
December 31, 2017 are furnished herewith, formatted in XBRL: (i) the Consolidated Balance Sheets, 
(ii) the Consolidated Statements of Operations, (iii) the Consolidated Statements of Changes in 
Shareholders’ Equity, (iv) the Consolidated Statements of Cash Flows, and (v) the Notes to the 
Consolidated Financial Statements. 

filed herewith 

*  
ITEM 16. 

None. 

FORM 10-K SUMMARY 

80 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In accordance with Section 13 or 15(d) of the Exchange Act of 1934, the registrant caused this report to be signed 

on its behalf by the undersigned, thereunto duly authorized.  

SIGNATURES 

Date:   March 8, 2018 

GOLD RESOURCE CORPORATION 

/s/ Jason D. Reid 
By: Jason D. Reid, Chief Executive Officer, 
President and Director 

In accordance with the Exchange Act, this Report has been signed below by the following persons on behalf of the 

Company and in the capacities and on the dates indicated.  

/s/ Jason D. Reid 
Jason D. Reid 

/s/ John A. Labate 
John A. Labate 

/s/ Bill M. Conrad 
Bill M. Conrad 

/s/ Alex G. Morrison 
Alex Morrison 

/s/ Gary C. Huber 
Gary C. Huber 

      Chief Executive Officer, President and Director 

      March 8, 2018 

(Principal Executive Officer) 

  Chief Financial Officer 

  March 8, 2018 

(Principal Financial and Accounting Officer) 

  Chairman of the Board of Directors 

  March 8, 2018 

  Director 

  Director 

  March 8, 2018 

  March 8, 2018 

81 

 
 
 
 
      
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Arista Mine Drilling 2007 – 2017

Gold Resource Corporation
2886 Carriage Manor Point
Colorado Springs, Colorado 80906
303-320-7708 (Office)  -  303-320-7835 (Fax)
www.goldresourcecorp.com