UNITED STATES 
SECURITIES AND EXCHANGE COMMISSION 
Washington, D.C. 20549

Form 20-F

☐☐

☒☒

☐☐

☐☐

REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

OR

For the fiscal year ended December 31, 2016

OR

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

OR

SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Commission File Number: 001-36761

KENON HOLDINGS LTD. 
(Exact name of registrant as specified in its charter)

(Company Registration No. 201406588W)

4911
(Primary Standard Industrial
Classification Code Number)

Not Applicable
(I.R.S. Employer
Identification No.)

Singapore
(State or other jurisdiction of
incorporation or organization)

1 Temasek Avenue #36-01 
Millenia Tower 
Singapore 039192 
+65 6351 1780 
(Address, including zip code, and telephone number, including area code, of registrant’s principal executive offices)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Copies to: 
Scott V. Simpson 
James A. McDonald 
Skadden, Arps, Slate, Meagher and Flom (UK) LLP 
40 Bank Street 
London E14 5DS 
Telephone: +44 20 7519 7000 
Facsimile: +44 20 7519 7070

Securities registered or to be registered pursuant to Section 12(b) of the Act:

Title of Each Class
Ordinary Shares, no par value

Name of Each Exchange on Which Registered
The New York Stock Exchange

Securities registered or to be registered pursuant to Section 12(g) of the Act: None

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act: None

Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by the annual report:

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. 

53,719,667 shares

Yes ☒     No ☒

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934.   

Yes  ☐     No  ☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such a
shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.   

Yes ☒     No  ☐

Indicate by check mark whether the registrant has submitted electronically or posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule
405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).   

Yes  ☐     No  ☐

Indicate by check mark whether the registrant is an accelerated filer, a large accelerated filer, a non-accelerated filer, or an emerging growth company. See definition of “large accelerated filer,”
“accelerated filer,” and “emerging growth company”  in Rule 12b-2 of the Exchange Act. (Check one):

Large accelerated filer  ☐                  Accelerated filer  ☒                  Non-accelerated filer  ☐                  Emerging growth company  ☐

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition
period for complying with any new or revised financial accounting standards † provided pursuant to Section 13(a) of the Exchange Act.  ☐

 † The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5,
2012.

 Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:

U.S. GAAP ☐

International Financial Reporting Standards as issued by the International
Accounting Standards Board  ☒

Other ☐

If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the Registrant has elected to follow:

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).   

(APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PAST FIVE YEARS)

Yes  ☐     No  ☒

Item 17  ☐     Item 18  ☐

Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of
securities under a plan confirmed by a court.   

Yes  ☐     No  ☒

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TABLE OF CONTENTS

PART I

ITEM 1.           Identity of Directors, Senior Management and Advisers

                   A.

                   B.

                   C.

Directors and Senior Management

Advisers

Auditors

ITEM 2.          Offer Statistics and Expected Timetable

ITEM 3 .         Key Information

                   A.

                   B.

                   C.

                   D.

Selected Financial Data

Capitalization and Indebtedness

Reasons for the Offer and Use of Proceeds

Risk Factors

ITEM 4.          Information on the Company

                   A.

                   B.

                   C.

                   D.

History and Development of the Company

Business Overview

Organizational Structure

Property, Plants and Equipment

ITEM 4A.      Unresolved Staff Comments

ITEM 5.         Operating and Financial Review and Prospects

                   A.

                   B.

                   C.

                   D.

                   E.

                   F.

                   G.

Operating Results

Liquidity and Capital Resources

Research and Development, Patents and Licenses, Etc.

Trend Information

Off-Balance Sheet Arrangements

Tabular Disclosure of Contractual Obligations

Safe Harbor

ITEM 6 .           Directors, Senior Management and Employees

                   A.

                   B.

                   C.

                   D.

                   E.

Directors and Senior Management

Compensation

Board Practices

Employees

Share Ownership

ITEM 7.          Major Shareholders and Related Party Transactions

                   A.

Major Shareholders

                   B.

                   C.

Related Party Transactions

Interests of Experts and Counsel

ITEM 8.          Financial Information

                   A.

                   B.

Consolidated Statements and Other Financial Information

Significant Changes

ITEM 9.          The Offer and Listing

                   A.

                   B.

                   C.

                   D.

                   E.

                   F.

Offer and Listing Details.

Plan of Distribution

Markets

Selling Shareholders

Dilution.

Expenses of the Issue

ITEM 10.        Additional Information

                   A.

                   B.

                   C.

                   D.

Share Capital

Constitution

Material Contracts

Exchange Controls

i

1

1

1

1

1

1

1

1

9

9

9

64

64

64

163

164

164

164

185

206

230

230

231

231

233

233

233

235

235

237

238

238

238

239

240

240

240

241

241

241

242

242

242

242

242

242

242

242

254

254

 
 
                   E.

                   F.

G.

H.

Taxation

Dividends and Paying Agents

Statement by Experts

Documents on Display

                   I.

Subsidiary Information

ITEM 11.        Quantitative and Qualitative Disclosures about Market Risk

ITEM 12.        Description of Securities Other than Equity Securities

Debt Securities

Warrants and Rights

Other Securities

American Depositary Shares

A.

                   B.

                   C.

D.

PART II

ITEM 13.        Defaults, Dividend Arrearages and Delinquencies

ITEM 14.         Material Modifications to the Rights of Security Holders and Use of Proceeds

ITEM 15.        Controls and Procedures

ITEM 16.         [RESERVED]

ITEM 16A.     Audit Committee Financial Expert

ITEM 16B.      Code of Ethics

ITEM 16C.      Principal Accountant Fees and Services

ITEM 16D.     Exemptions from the Listing Standards for Audit Committees

ITEM 16E.      Purchases of Equity Securities by the Issuer and Affiliated Purchasers

ITEM 16F.      Change in Registrant's Certifying Accountant

ITEM 16G.      Corporate Governance

ITEM 16H.      Mine Safety Disclosure

PART III

ITEM 17.        Financial Statements

ITEM 18.        Financial Statements

ITEM 19.        Exhibits

ii

254

258

258

258

258

258

259

259

259

259

259

260

260

260

260

261

261

261

261

261

261

262

262

262

263

263

263

263

                  
                  
                  
                  
We have prepared this annual report using a number of conventions, which you should consider when reading the information contained herein. In this annual report, the “Company,” “we,”

“us” and “our” shall refer to Kenon Holdings Ltd., or Kenon, and each of our subsidiaries and associated companies, collectively, as the context may require, including:

INTRODUCTION AND USE OF CERTAIN TERMS

·

·

I.C. Power Asia Development Ltd. (“ICP”), formerly I.C. Power Ltd., an Israeli holding company with electricity generation and distribution operations in Latin America, the Caribbean
and Israel, in which Kenon has an indirect 100% interest;

IC Power Ltd. (“IC Power”), formerly IC Power Pte. Ltd, a Singaporean holding company, in which Kenon has a direct 100% interest. IC Power holds a direct 100% interest in ICP;

· Qoros Automotive Co., Ltd. (“Qoros”), a Chinese automotive company based in China, in which Kenon has a 50% interest;

·

·

ZIM Integrated Shipping Services, Ltd. (“ZIM”), an Israeli global container shipping company, in which Kenon has a 32% interest; and

Primus Green Energy, Inc. (“Primus”), a New Jersey corporation which is an innovative developer of an alternative fuel technology, in which Kenon, through IC Green, has a 91% interest.

Additionally, this annual report uses the following conventions:

·

·

·

·

·

·

·

·

·

“Ansonia” means Ansonia Holdings Singapore B.V., a company organized under the laws of Singapore, which owns approximately 58% of the outstanding shares of Kenon;

“HelioFocus” means HelioFocus Ltd., an Israeli corporation, in which Kenon, through IC Green, has a 70% interest, and which is currently in a liquidation process;

“IC” means Israel Corporation Ltd., an Israeli corporation traded on the Tel Aviv Stock Exchange, or the “TASE,” and Kenon’s former parent;

“IC Green” means IC Green Energy Ltd., an Israeli corporation, which holds Kenon’s equity interests in Primus and HelioFocus;

“Petrotec” means Petrotec AG, a German company listed on the Frankfurt Stock Exchange, which IC Green sold in December 2014;

“Quantum” means Quantum (2007) LLC, a Delaware limited liability company, which is the direct owner of our 50% interest in Qoros;

“our businesses” shall refer to each of our subsidiaries and associated companies, collectively, as the context may require;

“spin-off” shall refer to (i) IC’s January 7, 2015 contribution to Kenon of its interests in each of IC Power, Qoros, ZIM, Tower, Primus, HelioFocus and REG, as well as other intermediate
holding companies related to these entities, and (ii) IC’s January 9, 2015 distribution of Kenon’s issued and outstanding ordinary shares, via a dividend-in-kind, to IC’s existing
shareholders; and

“Tower” means Tower Semiconductor Ltd., an Israeli specialty foundry semiconductor manufacturer, listed on the NASDAQ stock exchange, or “NASDAQ,” and the TASE.

Additionally, this annual report uses the following conventions for IC Power:

·

IC Power’s Operating Companies, Assets under Development, Pipeline Projects and Other Relevant Businesses:

·

·

·

“Acter Holdings” means Inkia Holdings (Acter) Limited, a Cayman Islands corporation through which IC Power held its interest in Southern Cone Power Perú S.A.;

“Agua Clara” means IC Power DR Operations S.A.S., a Dominican Republic corporation;

“Amayo I” means Consorcio Eólico Amayo S.A., a Panamanian corporation;

iii

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

“Amayo II” means Consorcio Eólico Amayo (Fase II) S.A., a Panamanian corporation;

“CDA” means Cerro del Águila S.A., a Peruvian corporation;

“Cenérgica” means Cenérgica, S.A. de C.V., a Salvadorian corporation;

“Central Cardones” means Central Cardones S.A., a Chilean corporation;

“CEPP” means Compañía de Electricidad de Puerto Plata S.A., a Dominican Republic corporation;

“COBEE” means Compañía Boliviana de Energía Eléctrica S.A., a Canadian corporation;

“Colmito” means Termoeléctrica Colmito Ltda., a Chilean corporation;

“Corinto” means Empresa Energética Corinto Ltd., a Cayman Islands corporation;

“DEOCSA” means Distribuidora de Electricidad de Occidente, S.A., a Guatemalan corporation;

“DEORSA” means Distribuidora de Electricidad de Oriente, S.A., a Guatemalan corporation;

“Enel Generación Perú” means Enel Generación Perú S.A.A. Enel Generación Perú previously operated under the name Edegel;

“Energuate” means DEORSA and DEOCSA, collectively. Energuate is the trade name of IC Power’s Guatemalan distribution businesses DEORSA and DEOCSA. Energuate is not a
legal entity;

“Generandes” means Generandes Perú S.A., a Peruvian corporation through which IC Power held its indirect interest in Enel Generación Perú;

“Guatemel” means Comercializadora Guatemalteca Mayorista de Electricidad, S.A., a Guatemalan corporation;

“Hadera Paper” means Hadera Paper Ltd., an Israeli corporation;

“ICPDH” means IC Power Distribution Holdings Pte. Ltd., a Singaporean corporation;

“ICPI” means IC Power Israel Ltd., an Israeli corporation;

“ICPNH” means IC Power Nicaragua Holdings, a Cayman Islands corporation, formerly known as AEI Nicaragua Holdings Ltd., or AEI Nicaragua;

“Inkia” means Inkia Energy Limited, a Bermudian corporation;

“JPPC” means Jamaica Private Power Company Ltd., a Jamaican corporation;

“Kallpa” means Kallpa Generación S.A., a Peruvian corporation;

“Kanan” means Kanan Overseas I. Inc., a Panamanian corporation;

“Nejapa” means Nejapa Power Company S. de R.L., a Panamanian corporation;

“OIP” means Overseas Investments Peru S.A., a Peruvian corporation;

“OPC-Rotem” means O.P.C. Rotem Ltd., an Israeli corporation;

“OPC-Hadera” is the trade name of Advanced Integrated Energy Ltd., an Israeli corporation;

“Pedregal” means Pedregal Power Company S.de.R.L, a Panamanian corporation;

“Puerto Quetzal” means Puerto Quetzal Power L.L.C., a Delaware limited liability company;

“RECSA” means Redes Eléctricas de Centroamérica, S.A., a Guatemalan corporation;

“Samay I” means Samay I S.A., a Peruvian corporation;

iv

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

“Surpetroil” means Surpetroil S.A.S., a Colombian corporation; and

“Tipitapa Power” means Tipitapa Power Company Ltd., a Cayman Islands corporation.

·

IC Power’s Regulatory Bodies and Electricity System Coordination Entities

·

·

·

·

·

·

·

·

·

·

·

·

·

“AMM” means Wholesale Market Administrator ( Administrador del Mercado Mayorista ), a private entity that coordinates the operation of the generation facilities and international
interconnections and transmission lines that form Guatemalan National Electricity System;

“ANA” means the National Water Authority of Peru (Autoridad Nacional del Agua );

“CND” means the National Dispatch Center of Panama ( Centro Nacional de Despacho );

“CNDC” means, as applicable, (i) the National Dispatch Committee of Bolivia ( Comité Nacional de Despacho de Carga ), a governmental entity responsible for planning and
coordinating the operation of the generation, transmission and distribution systems that form the SIN in Bolivia or (ii) the National Dispatch Center of Nicaragua ( Centro Nacional de
Despacho de Cargo ), a governmental entity responsible for the management of Nicaragua’s electricity market and national interconnected electrical system;

“CNEE” means the National Electric Energy Commission of Guatemala ( Comisión Nacional de Energia Electrica ), which was established pursuant to the General Electricity Law of
1996, Decree 93-96, or General Electricity Law ( Ley General de Electricidad ) and acts as a technical arm of the MEM and which determines the transmission and distribution tariffs
and is responsible for ensuring compliance with Guatemalan electricity laws;

“COES” means the Committee for the Economic Operation of the System ( Comité de Operación Económica del Sistema Interconectado Nacional ), an independent and private
Peruvian entity composed of qualified participants undertaking activities in SEIN which is responsible for planning and coordinating the operation of the generation, transmission and
distribution systems that form the SEIN;

“EA” means the Electricity Authority in Israel, which was established pursuant to the Electricity Sector Law to regulate and supervise, among other things, the provision of essential
electric services in Israel and electricity tariffs and, which replaced the previous regulator, Israel’s Public Utilities Authority (Electricity), or the PUAE, on January 1, 2016;

“Guatemalan National Electricity System” means the Guatemalan national electricity system, which comprises the set of premises, facilities, power plants, transmission lines,
substations, distribution grids, electric equipment, loading centers, including all of the electric infrastructure used to supply electricity, whether or not interconnected, within which
electric power is transmitted among the country’s several regions;

“IEC” means Israel Electric Corporation, a government-owned entity, which generates and supplies the majority of electricity in Israel, transmits and distributes all of the electricity in
Israel, acts as the system operator of Israel’s electricity system, determines the dispatch order of generation units, grants interconnection surveys, and sets spot prices, among other
roles;

“INDECOPI” means the National Institute for the Defense of Competition and Intellectual Property Protection ( Instituto Nacional de Defensa de la Competencia y de la Protección de
la Propiedad Intelectual ), the Peruvian antitrust and intellectual property regulator;

“INDE” means the National Electrification Institute of Guatemala ( Instituto Nacional de Electrificación ), a state entity in charge of development of local power production pursuant
to the INDE Statutory Law ( Ley Orgánica del Instituto Nacional de Electrificación ) and consequently in accordance with the General Electricity Law. This entity operates through its
three divisions: Empresa de Generación de Energía Eléctrica (EGEE), which is responsible for power generation, Empresa de Transporte y Control de Energía Eléctrica (ETCEE),
which is responsible for transmission and Empresa de Comercialización de Energía (ECOE), which is responsible for trading;

“MEM” means the Ministry of Energy and Mines of Guatemala ( Ministerio de Energía y Minas ), which is responsible for enforcing the General Electricity Law and the related
regulations and for the coordination of policies between CNEE and the AMM and overseeing energy and mining sectors in Guatemala;

“MINEM” means the Ministry of Energy and Mines of Peru ( Ministerio de Energía y Minas ), which is responsible for, among other things, setting national energy policy, proposing
and adopting laws and regulations to supervise the energy sector and granting concessions and authorizations to entities who wish to operate in power generation, transmission or
distribution in Peru;

v

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

·

·

·

·

·

·

·

·

“OC” means the Coordinating Body ( Organismo Coordinador ), a Dominican governmental authority whose function is to plan and coordinate the operations of the generation,
transmission and distribution systems that form the national interconnected electrical system of the Dominican Republic ( Sistema Eléctrico Nacional Interconectado );

“OEFA” means the Organization of Supervision and Environmental Assessment ( Organismo de Evaluacióny Fiscalización Ambiental ), the Peruvian governmental body responsible
for the power plants’ compliance with environmental regulations;

“OSINERGMIN” means the Supervisory Body of Investment in Energy and Mining ( Organismo Supervisor de la Inversión en Energía y Minería ), a Peruvian governmental authority
which is responsible for, among other things, ensuring that companies comply with the rules and regulations applicable to the energy industry in Peru and for setting the tariffs to be
charged to regulated customers;

“PUAE” means Israel’s Public Utilities Authority (Electricity), which, prior to January 1, 2016, regulated and supervised, among other things, the provision of essential electric
services in Israel and electricity tariffs. The PUAE was replaced by the EA on January 1, 2016;

“Salvadorian CNE” means the National Energy Commission of El Salvador ( Comisión Nacional de Energía ), a governmental entity which is responsible for proposing and adopting
policies and regulations for the Salvadorian energy sector;

“SEIN” means the national interconnected electrical system of Peru ( Sistema Eléctrico Interconectado Nacional );

“SENACE” means the National Service for Environmental Certification of Sustainable Investments of Peru ( Servicio Nacional de Certificación Ambiental para las Inversiones
Sostenibles ), a Peruvian specialized technical governmental agency in charge of reviewing and approving detailed environmental impact assessments related to projects involving
activities, works or services that may cause significant impacts to the environment;

“SIC” means the national interconnected electrical system of Chile ( Sistema Interconectado Central );

“SIEPAC” means Central American Electrical Interconnection System ( Sistema de Interconexión Eléctrica de los Países de América Central ) that connects the transmission systems
of Nicaragua, Panama, Costa Rica, Honduras, El Salvador and Guatemala through a 230 KW transmission line;

“SIGET” means the General Superintendency of Electricity and Telecommunications ( Superintendencia General de Electricidad y Telecomunicaciones ), a Salvadorian entity which is
responsible for ensuring that companies comply with the rules and regulations passed by the Salvadorian CNE, as well as other laws that are applicable to the energy industry in El
Salvador;

“SIN” means a national system formed by generation plants, the interconnected grid, regional transmission lines, distribution lines and consumer loads ( Sistema Interconectado
Nacional ) in each of Bolivia, Colombia and Guatemala;

“SING” means the Interconnected System of Norte Grande of Chile ( Sistema Interconectado Norte Grande ); and

“UPME” means the Mining and Energy Planning Unit ( Unidad de Planeación Minero Energética ), a special administrative unit of the Ministry of Mines and Energy of Colombia.

·

Industry and Other Terms Relevant to IC Power’s Operations

·

·

·

·

“availability factor” means the percentage of hours a power generation unit is available for generation of electricity in the relevant period, whether or not the unit is actually dispatched
or used for generating power;

“Btu” means British thermal units;

“CAGR” means compound annual growth rate;

“COD” means the commercial operation date of a development project;

vi

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

“distribution” refers to the transfer of electricity from the transmission lines at grid supply points and its delivery to consumers at lower voltages through a distribution system;

“EPC” means engineering, procurement and construction;

“firm capacity” means the amount of energy available for production that, pursuant to applicable regulations, must be guaranteed to be available at a given time for injection to a
certain power grid;

“greenfield projects” means projects constructed on unused land with no need to demolish or remodel existing structures;

“GWh” means gigawatt hours (one GWh is equal to 1,000 MWh);

“Heat rate” means the number of British thermal units, or Btus, of energy contained in the fuel required to produce a kilowatt-hour of energy (btu/kWh) for thermal plants;

“HFO” means heavy fuel oil;

“hydro” means hydroelectric;

“IC Power’s capacity” or “IC Power’s installed capacity” means, with respect to each asset, 100% of the capacity of such asset, regardless of IC Power’s ownership interest in the
entity that owns such asset;

“proportionate capacity” means, with respect to each asset, the proportionate capacity of such asset, as determined by IC Power’s ownership interest in the entity that owns such asset;

“installed capacity” means the intended full-load sustained output of energy that a generation unit is designed to produce (also referred to as name-plate capacity);

“IPP” means independent power producer, excluding co-generators and generators for self-consumption;

“kWh” means kilowatts per hour;

“MW” means megawatts (one MW is equal to 1,000 kilowatts or KW);

“MWh” means megawatt per hour;

“OEM” means original equipment manufacturer;

“PPA” means power purchase agreement;

“transmission” refers to the bulk transfer of electricity from generating facilities to the distribution system at load center station in which the electricity is stabilized by means of the
transmission grid;

“VAD” means the Value Added by Distribution ( Valor Agregado de Distribución ) charge that is set by the CNEE;

“VNR” means variable transmission revenue and VNR of transmission system is the estimated cost of replicating a “model” transmission system including an estimated return on
capital;

“VNR of the transmission system” means the estimated cost of replacing a “model” transmission system, including an estimated return on capital; and

“weighted average availability” refers to the number of hours that a generation facility is available to produce electricity divided by the total number of hours in a year.

Although we acquired each of our subsidiaries and associated companies in connection with the spin-off, the operating and other statistical information with respect to each of our subsidiaries

and associated companies is presented as of December 31, 2016, unless otherwise indicated, as if we owned such businesses for the periods covered by this annual report.

We produce financial statements in accordance with the International Financial Reporting Standards, or IFRS, issued by the International Accounting Standards Board, or IASB, and all

financial information included in this annual report is derived from our IFRS financial statements, except as otherwise indicated. In particular, this annual report contains certain non-IFRS financial
measures which are defined under “ Item 3.A Selected Financial Data ” and “ Item 4.B Business Overview—Our Businesses—IC Power. ” In addition, certain financial information relating to Tower,
where indicated, has been derived from Tower’s financial statements that have been prepared in accordance with U.S. Generally Accepted Accounting Principles, or U.S. GAAP.

FINANCIAL INFORMATION

vii

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Our financial statements as of and for the year ended December 31, 2014, are presented as combined carve-out financial statements and have been derived from the consolidated financial
statements of IC, our former parent. These combined financial statements reflect the assets, liabilities, revenues and expenses directly attributable to us, as well as allocations deemed reasonable by us, to
present our combined financial position, profit and loss and other comprehensive income, changes in equity attributable to the owners of the company and cash flows. These combined carve-out financial
statements are not necessarily indicative of our financial position, profit and loss and other comprehensive income, or cash flows had we operated as a separate entity throughout the periods presented.
We present our combined carve-out financial statements in U.S. Dollars.

Our financial statements as of and for the years ended December 31, 2016 and 2015, are presented as consolidated financial statements. These consolidated financial statements included in this

annual report comprise the consolidated statements of profit and loss, other comprehensive income, changes in equity, and cash flows for the years ended December 31, 2016 and 2015 and the
consolidated statement of financial position as of December 31, 2016 and 2015. We present our consolidated financial statements in U.S. Dollars.

All references in this annual report to (i) “U.S. Dollars”, “$” or “USD” are to the legal currency of the United States of America; (ii) “RMB” are to Yuan, the legal currency of the People’s

Republic of China, or China; (iii) “NIS” or “New Israeli Shekel” are to the legal currency of the State of Israel, or Israel; (iv) “Peruvian Sol” are to the legal currency of Peru; (v) “Bs” or “Bolivianos”
are to the legal currency of the Plurinational State of Bolivia, or Bolivia; (vi) “S$” are to Singapore Dollars, the legal currency of the Republic of Singapore, or Singapore; (vii) “Colombian pesos” are to
the legal currency of the Republic of Colombia, or Colombia; (viii) “Chilean pesos” are to the legal currency of the Republic of Chile, or Chile and (ix) “Guatemalan Quetzales” are to the legal currency
of the Republic of Guatemala, or Guatemala. We have made rounding adjustments to reach some of the figures included in this annual report. Consequently, numerical figures shown as totals in some
tables may not be arithmetic aggregations of the figures that precede them.

In this annual report, we also include the consolidated financial statements of profit or loss and other comprehensive income, changes in equity, and cash flows for the years ended December 31,

2016, 2015 and 2014, and consolidated statements of financial position as of December 31, 2016 and 2015 for Qoros, pursuant to Rule 3-09 of Regulation S-X.

NON-IFRS FINANCIAL INFORMATION

In this annual report, we disclose non-IFRS financial measures, namely Adjusted EBITDA and Net Debt, each as defined under “ Item 3.A Selected Financial Data–Selected Reportable

Segment Data ” and “ Item 3.A Selected Financial Data–Selected Reportable Segment Data–IC Power ” and “ Item 4.B Business Overview—Our Businesses—IC Power—IC Power’s Description of
Operations. ” Each of these measures are important measures used by us, and our businesses, to assess financial performance. We believe that the disclosure of Adjusted EBITDA and Net Debt provides
transparent and useful information to investors and financial analysts in their review of our, or our subsidiaries’ and associated companies’, operating performance and in the comparison of such
operating performance to the operating performance of other companies in the same industry or in other industries that have different capital structures, debt levels and/or income tax rates.

The following tables set forth the historical period-end, average, high and low noon buying rates in New York City for cable transfers in foreign currencies as certified by the Federal Reserve

Bank of New York for the U.S. Dollar expressed in RMB per one U.S. Dollar for the periods indicated:

EXCHANGE RATE INFORMATION

Year
2012  
2013  
2014  
2015  
2016  
_____________________

Period end 1

Average rate 2

High

Low

RMB/U.S. Dollar

6.2301 
6.0537 
6.2046 
6.4778 
6.9430 

6.2990 
6.1412 
6.1701 
6.2869 
6.6549 

6.3879 
6.2438 
6.2591 
6.4896 
6.9580 

6.2221 
6.0537 
6.0402 
6.1870 
6.4480 

1. Represents the closing exchange rate on the last business day of the applicable period.
2. Represents the average of the closing exchange rates on the last business day of each month during the relevant one-year periods.

viii

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Month
October 2016  
November 2016  
December 2016  
January 2017  
February 2017  
March 2017  
April 2017 (through April 14)  

RMB/U.S. Dollar

High

Low

6.7819 
6.9195 
6.9580 
6.9575 
6.8821 
6.9132 
6.8988 

6.6685 
6.7534 
6.8771 
6.8360 
6.8517 
6.8687 
6.8832 

MARKET AND INDUSTRY DATA

Certain information relating to the industries in which each of our subsidiaries and associated companies operate and their position in such industries used or referenced in this annual report

were obtained from internal analysis, surveys, market research, publicly available information and industry publications. Unless otherwise indicated, all sources for industry data and statistics are
estimates or forecasts contained in or derived from internal or industry sources we believe to be reliable. Market data used throughout this annual report was obtained from independent industry
publications and other publicly available information. Such data, as well as internal surveys, industry forecasts and market research, while believed to be reliable, have not been independently verified. In
addition, in certain cases we have made statements in this annual report regarding the industries in which each of our subsidiaries and associated companies operate and their position in such industries
based upon the experience of our businesses and their individual investigations of the market conditions affecting their respective operations. We cannot assure you that any of these statements are
accurate or correctly reflect the position of subsidiaries and associated companies in such industries, and none of our internal surveys or information has been verified by independent sources.

Market data and statistics are inherently predictive and speculative and are not necessarily reflective of actual market conditions. Such statistics are based upon market research, which itself is
based upon sampling and subjective judgments by both the researchers and the respondents. In addition, the value of comparisons of statistics for different markets is limited by many factors, including
that (i) the markets are defined differently, (ii) the underlying information was gathered by different methods and (iii) different assumptions were applied in compiling the data. Accordingly, although we
believe and operate as though all market and industry information presented in this annual report is accurate, the market statistics included in this annual report should be viewed with caution.

REPRESENTATION OF CAPACITY AND PRODUCTION FIGURES

Unless otherwise indicated, statistics provided throughout this annual report with respect to power generation units are expressed in MW, in the case of the capacity of such power generation

units, and in GWh, in the case of the electricity production of such power generation units. One GWh is equal to 1,000 megawatt hours, or MWh, and one MWh is equal to 1,000 kilowatt hours, or kWh.
Statistics relating to aggregate annual electricity production are expressed in GWh and are based on a year of 8,760 hours. Unless otherwise indicated, IC Power’s capacity figures provided in this annual
report reflect 100% of the capacity of all of IC Power’s assets, regardless of IC Power’s ownership interest in the entity that owns each such asset, and IC Power’s consolidated generation figures
provided in this annual report reflect 100% of the generation figures of IC Power’s subsidiaries, and excludes the generation figures of IC Power’s associated companies. Excluding the generation figures
of OPC-Hadera, whose generation figures are only presented since the date of its acquisition in August 2015, generation figures for assets acquired during a year are presented for the full year, regardless
of the date within the year when the acquisition occurred. As a result, the generation figures provided in this annual report of ICPNH, Puerto Quetzal, Surpetroil and JPPC, which IC Power acquired in
2014, and OPC-Hadera, which IC Power acquired in 2015, reflect 100% of the generation figures of these companies for the years ended December 31, 2014 and 2015, respectively, regardless of IC
Power’s date of acquisition of such companies. For information on IC Power’s ownership interest in each of its operating companies and associated companies, see “ Item 4.B Business Overview—Our
Businesses—IC Power. ” For further details on technical conventions used in this annual report, see “ Introduction and Use of Certain Terms .”

INFORMATION REGARDING TOWER

On July 23, 2015, consistent with our strategy to realize value for our shareholders by, among other things, distributing our interests in our non-primary businesses to our shareholders rationally

and expeditiously, we completed the pro rata distribution in specie of 18,030,041 ordinary shares of Tower, representing 23% of the then currently outstanding Tower shares and substantially all of our
interest in Tower, to holders of our ordinary shares. In 2016, we sold our remaining interest in Tower.

Tower is subject to the reporting requirements of the Securities and Exchange Commission, or the SEC, and, as a foreign private issuer, Tower is required to file with the SEC annual reports

containing audited financial information, and to furnish to the SEC reports containing any material information that Tower provides to its local securities regulator, investors or stock exchange. Tower’s
published financial statements are prepared according to U.S. GAAP. Information related to Tower contained, or referred to, in this annual report has been derived from Tower’s public filings with the
SEC. Although we held a significant equity interest in Tower during certain periods discussed in this annual report, we did not control or manage Tower, participate in the preparation of Tower’s public
reports or financial statements or have any specific information rights regarding Tower during such periods. Tower’s publicly available filings can be found on the SEC’s website at www.sec.gov.

ix

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS

This annual report contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, or the Exchange Act, and reflects our current expectations

and views of the quality of our assets, our anticipated financial performance, our future growth prospects, the future growth prospects of our businesses, the liquidity of our ordinary shares, and other
future events. Forward-looking statements relate to expectations, beliefs, projections, future plans and strategies, anticipated events or trends and similar expressions concerning matters that are not
historical facts, and are principally contained in the sections entitled “ Item 3. Key Information ,” “ Item 4. Information on the Company ” and “ Item 5. Operating and Financial Review and Prospects .”
These statements are made under the “safe harbor” provisions of the U.S. Private Securities Litigation Reform Act of 1995. Some of these forward-looking statements can be identified by terms and
phrases such as “anticipate,” “should,” “likely,” “foresee,” “believe,” “estimate,” “expect,” “intend,” “continue,” “could,” “may,” “plan,” “project,” “predict,” “will,” and similar expressions.

These forward-looking statements relate to:

·

·

·

·

·

·

·

·

·

·

·

·

·

our goals and strategies;

our capital commitments and/or intentions with respect to each of our businesses;

our ability to implement, successfully or at all, our strategies for us and for each of our businesses;

our capital allocation principles, as set forth in “ Item 4.B Business Overview ”;

the funding requirements, strategies, and business plans of our businesses;

the potential listing, offering, distribution or monetization of our businesses and the anticipated timing thereof;

expected trends in the industries in which each of our businesses operate, including trends relating to the growth of a particular market;

our expected tax status and treatment;

our intention to borrow funds from our businesses, and the amount and the timing of such borrowings;

fluctuations in the availability and prices of commodities purchased by, or in competition with, our businesses;

statements relating to litigation and/or regulatory proceedings;

the expected effect of new accounting standards on Kenon;

with respect to IC Power:

·

·

·

·

·

·

·

·

·

expected supply and demand trends in the Peruvian power market;

the expected cost and timing of commencement and completion of construction and development projects, as well as the anticipated installed capacities and business results of such
acquisitions or projects;

its strategy to source and finance new, development and acquisition projects;

expected macroeconomic trends in certain of the countries in which IC Power currently operates;

its strategy to source and enter into long-term PPAs, and turnkey agreements and the amounts to be paid under such agreements, and the expected effect of such PPAs on IC Power’s
results of operations;

expected increased demand in certain of the power generation markets where IC Power currently operates or may operate in the future;

expected trends in energy consumption, particularly in Latin America;

the expected stages of the Samay I plant;

its anticipated capital expenditures, including the expected sources of funding for capital expenditures;

x

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

its strategy to improve service standards, reduce interruptions and improve customer service for its distribution business;

the expected revenues under its PPAs;

the expected effect of fluctuations in exchange rates and currency on IC Power’s results;

its strategy to acquire additional generation and distribution businesses;

the expected cash flows from its distribution businesses;

future subsidies available to IC Power’s businesses and distribution customers;

expected trends in electrification levels in Guatemala;

the competitive landscape within Energuate’s service areas;

its expected ability to enter into or renew its PPAs;

expected coverage under its insurance policies;

the expected water supply for IC Power’s hydroelectric plants;

its strategy to extend the final maturity of or refinance existing indebtedness;

the expected use of the proceeds of its indebtedness;

the expected impairment of IC Power’s Colombian assets;

the price and volume of gas available to OPC-Rotem and other IPPs in Israel; and

the potential nationalization of operating assets;

·

with respect to Qoros:

· Qoros’ expectation to renew or refinance its working capital facilities to support its continued operations and development;

· Qoros’ strategy to increase its sales volumes;

· Qoros’ expected sales volumes;

·

·

expected growth in the Chinese passenger vehicle market, particularly within the C-segment, C-segment SUV and New Energy Vehicle, or NEV, markets;

expected pricing trends in the Chinese passenger vehicle market;

· Qoros’ liquidity position and Qoros’ expected use of proceeds of funds it may receive;

· Qoros’ strategy to develop its dealer network;

·

·

the assumptions used in Qoros’ impairment analysis, including assumptions related to future sales volumes and price, operating expenses, and the availability of funding, including
certain subsidies from local Chinese governments during the projection period;

expected increase in environmental regulations and the expected effect of such regulations on Qoros’ business;

· Qoros’ agreement to have certain principal payments deferred;

· Qoros’ ability to increase its production capacity;

·

·

the terms of any shareholder loans which Kenon may provide Qoros;

the potential investment by Yibin into Qoros, including the use of the proceeds and the terms of such investment;

xi

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
· Qoros’ ability to launch new models using its existing platform, to the extent that demand for its vehicles increases; and

·

the expected development of the NEV market in China, including expected trends regarding government subsidies for the purchase of NEVs and the growth of NEV infrastructure.

·

with respect to ZIM:

·

·

the assumptions used in Kenon’s and ZIM’s impairment analysis with respect to Kenon’s investment in ZIM, and ZIM’s assets, respectively, including with respect to expected fuel
price, freight rates, demand trends;

ZIM’s strategy with respect to its debt obligations;

· modifications with respect to its and other shipping companies’ operating fleet and lines, including the utilization of larger vessels within certain trade zones and modifications made in

light of environmental regulations; and

·

trends related to the global container shipping industry, including with respect to fluctuations in container supply, industry consolidation, demand, bunker prices and charter/freights
rates;

·

with respect to Primus:

·

·

·

·

·

its strategy;

its plans to raise capital;

Primus’ potential customers;

its project pipeline; and

its potential sources of revenue.

The preceding list is not intended to be an exhaustive list of each of our forward-looking statements. The forward-looking statements are based on our beliefs, assumptions and expectations of

future performance, taking into account the information currently available to us and are only predictions based upon our current expectations and projections about future events. There are important
factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by
these forward-looking statements which are set forth in “ Item 3.D Risk Factors .” Given these risks and uncertainties, you should not place undue reliance on forward-looking statements as a prediction
of actual results.

Except as required by law, we undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The

foregoing factors that could cause our actual results to differ materially from those contemplated in any forward-looking statement included in this annual report should not be construed as exhaustive.
You should read this annual report, and each of the documents filed as exhibits to the annual report, completely, with this cautionary note in mind, and with the understanding that our actual future
results may be materially different from what we expect.

xii

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 1.                  Identity of Directors, Senior Management and Advisers

A.            Directors and Senior Management

PART I

Not applicable.

B.            Advisers

Not applicable.

C.            Auditors

Not applicable.

ITEM 2.                  Offer Statistics and Expected Timetable

Not applicable.

ITEM 3.                  Key Information

A.            Selected Financial Data

The following tables set forth our selected combined carve-out financial and other data (for all periods as of and prior to December 31, 2014) and selected consolidated financial and other

data (for all periods subsequent to December 31, 2014). This selected financial data should be read in conjunction with our audited financial statements, and the related notes thereto, as of December
31, 2016 and 2015 and for the years ended December 31, 2016, 2015 and 2014, included elsewhere in this annual report, and the information contained in “Item 5. Operating and Financial Review and
Prospects” and “Item 3.D Risk Factors.” The historical financial and other data included here and elsewhere in this annual report should not be assumed to be indicative of our future financial
condition or results of operations.

Our financial statements presented in this annual report have been prepared in accordance with IFRS as issued by the IASB.

1

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The selected financial data below also includes certain non-IFRS measures used by us to evaluate our economic and financial performance. These measures are not identified as accounting

measures under IFRS and therefore should not be considered as an alternative measure to evaluate our performance.

2016

2015

Year Ended December 31,
2014
(in millions of USD, except share data)

2013 1

2012 1

Statements of Profit and Loss Data 2
Revenues from sale of electricity 
Cost of sales and services (excluding depreciation) 
Depreciation 
Gross profit 
Selling, general and administrative expenses 
Gain from distribution of dividend in kind 
Gain from disposal of investees 
Gain on bargain purchase 
Impairment of assets and investments 
Dilution gains from reduction in equity interest held in associates
Other expenses 
Other income 
Operating profit from continuing operations 
Financing expenses 
Financing income 
Financing expenses, net 
Provision of financial guarantee 
Share in losses of associated companies, net of tax 3 
Profit / (loss) from continuing operations before income taxes
Income taxes 
Profit / (loss) for the year from continuing operations
Profit / (loss) for the year from discontinued operations (after taxes) 4
Profit / (loss) for the year 
Attributable to:
Kenon’s shareholders 
Non-controlling interests 
Profit / (loss) for the year attributable to Kenon’s shareholders derived

from:
IC Power 
Qoros 
ZIM 

Gain from ZIM in light of deconsolidation and change to associated

company

Tower 
Impairment of ZIM 
Provision of financial guarantee 
Gain from distribution of dividend in kind 
Other 5 
Total profit / (loss) for the year attributable to Kenon’s shareholders
Basic/diluted (loss)/profit per share attributable to Kenon’s shareholders (in

dollars):

Basic/diluted profit/(loss) per share 
Basic/diluted profit/(loss) per share from continuing operations
Basic/diluted profit/(loss) per share from discontinued operations
Statements of Financial Position Data
Cash and cash equivalents 
Short-term investments and deposits 
Trade receivables, net 
Other current assets, including derivatives 
Income tax receivable 
Inventories 
Total current assets 
Total non-current assets 6 
Total assets 
Total current liabilities 
Total non-current liabilities 
Equity attributable to the owners of the Company 
Share capital 
Total equity 
Total liabilities and equity 

Basic/Diluted weighted average common shares outstanding used in

calculating profit/(loss) per share (thousands)

Statements of Cash Flow Data
Net cash provided by operating activities 
Net cash used in investing activities 
Net cash provided by financing activities 
(Decrease) / increase in cash and cash equivalents 

  $

  $

  $

  $

  $

  $

  $

  $

  $

  $

  $

  $

  $
  $
  $

  $

  $

  $

1,874 
(1,359)  
(160)  
355 
(147)  
— 
— 
— 
(72)  
— 
(5)  
21 
152 
(190)  
19 
(171)   $
(130)  
(186)  
(335)   $
(59)  
(394)   $
— 
(394)   $

  $

  $

  $

1,289 
(863)  
(111)  
315 
(104)  
210 
— 
— 
(6)  
33 
(7)  
15 
456 
(124)  
13 
(111)   $
— 
(187)  
158 
(62)  
96 
— 
96 

  $
  $
  $

  $

  $

  $

  $

1,372 
(981)  
(100)  
291 
(131)  
— 
157 
68 
(48)  
— 
(14)  
51 
374 
(110)  
16 
(94)   $
— 
(171)  
109 
(103)  
6 
471 
477 

  $
  $
  $

  $

  $

(412)   $
18 

  $

3 
(143)  
(54)  

— 
— 
(72)  
(130)  
— 
(16)  
(412)   $

(7.67)  
(7.67)  
— 

327 
90 
284 
50 
11 
92 
854 
4,284 
5,138 
1,045 
3,199 
681 
1,267 
894 
5,138 

  $

  $

  $

  $
  $
  $

  $

73 
23 

  $

63 
(196)  
1 

— 
(1)  
— 
— 
210 

(4)  
73 

  $

1.36 
1.36 
— 

384 
309 
124 
45 
4 
51 
916 
3,567 
4,483 
653 
2,566 
1,061 
1,267 
1,264 
4,483 

  $

  $
  $
  $

  $
  $

  $

458 
19 

  $

199 
(175)  
(142)  

609 
10 
— 
— 
— 
(43)  
458 

  $

8.58 
(0.23)  
8.81 

610 
227 
181 
59 
4 
55 
1,136 
3,184 
4,320 
497 
2,385 
1,230 
— 
1,438 
4,320 

  $

  $

  $
  $
  $

  $
  $

  $

  $

873 
(594)  
(70)  
209 
(73)  
— 
— 
1 
— 
— 
(5)  
5 
137 
(69)  
5 

  $

(64)   $
— 
(127)  
(54)   $
(49)  
(103)   $
(513)   $
(616)   $

(631)   $

15 

  $

61 
(127)  
(533)  

— 
(27)  
— 
— 
— 
(5)  
(631)   $

(11.82)  
(2.13)  
(9.69)  

671 
30 
358 
98 
7 
150 
1,314 
4,671 
5,985 
2,925 
2,113 
710 
— 
947 
5,985 

  $

  $

  $
  $
  $

  $
  $

577 
(395)
(51)
131 
(69)
— 
5 
— 
— 
— 
— 
12 
79 
(39)
3 
(36)
— 
(52)
(9)
(20)
(29)
(409)
(438)

(450)
12 

59 
(54)
(432)

— 
(21)
— 
— 
— 
(2)
(450)

(8.43)
(0.77)
(7.66)

414 
89 
323 
83 
15 
174 
1,098 
4,880 
5,978 
1,172 
3,357 
1,214 
— 
1,449 
5,978 

53,720 

53,649 

53,3837   

53,3837   

53,3837  

  $

162 
(400)  
175 
(63)  

  $

290 
(737)  
233 
(214)  

  $

410 
(883)  
430 
(42)  

  $

257 
(278)  
281 
260 

169 
(320)
122 
(29)

1. Results during these periods have been reclassified to reflect the discontinued operations of ZIM and Petrotec. For further information, see Note 28 to our financial statements included in this annual

report.

2. Consists of the consolidated results of IC Power and Primus for 2012 through 2013 and, from June 30, 2014, the consolidated results of HelioFocus; prior to this date, Kenon did not consolidate

3.

HelioFocus’ results of operations.
Includes Kenon’s share in ZIM’s loss for the six months ended December 31, 2014 and the years ended December 31, 2015 and 2016. As from July 1, 2014, Kenon accounted for ZIM’s results of
operations pursuant to the equity method of accounting.

4. Consists of (i) ZIM’s results of operations for 2012 through 2013 and the six months ended June 30, 2014 and (ii) Petrotec’s results of operations for 2012 through 2014.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2

 
5. Consists of the elimination of intercompany finance income until 2014, Kenon’s general and administrative expenses, finance expenses, the results of Primus and gain from reductions in equity

invested. From June 30, 2014, also includes the consolidated results of HelioFocus.
Includes Kenon’s associated companies: (i) Qoros, (ii) Tower (until June 30, 2015), (iii) from June 30, 2014, ZIM; and (iv) prior to June 30, 2014, HelioFocus.

6.
7. Based on 53,383,015 shares which were issued as of January 7, 2015, the date of our spin-off from IC.

Selected Reportable Segment Data

Kenon is a holding company of (i) IC Power, (ii) Primus, (iii) a 32% interest in ZIM, (iv) a 50% interest in Qoros, (v) until December 24, 2014, Petrotec, and (vi) until July 23, 2015, a 22.5%
interest in Tower. Kenon’s segments are IC Power (Generation and Distribution), Qoros and Other. Kenon’s Other segment includes the results of ZIM, Primus, and from June 30, 2014, the results of
HelioFocus and Kenon (Company level). Kenon's segments for the periods after December 31, 2015 include IC Power (Generation) and IC Power (Distribution), as a result of Kenon’s acquisition of its
distribution business in January 2016.

The results of the following companies are included in Kenon’s statements of profit and loss as share in losses of associated companies, net of tax, for the years set forth below, except as
otherwise indicated: (i) Qoros, (ii) ZIM from June 30, 2014, (iii) Tower until June 30, 2015, (iv) HelioFocus until June 30, 2014 (subsequently, HelioFocus’ results have been consolidated with Kenon’s)
and (v) certain non-controlling interests held by IC Power. The following table sets forth selected financial data for Kenon’s reportable segments for the periods presented:

IC Power
Generation

IC Power
Distribution

Qoros 1

Other 2

Adjustments 3

Consolidated
Results

Year Ended December 31, 2016

(in millions of USD, unless otherwise indicated)
  $
  $

Sales 
Depreciation and amortization 
Impairment of assets and investments 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Provision of financial guarantee 
Income (loss) before taxes 
Income taxes 
Income (loss) from continuing operations 

Attributable to:

Kenon’s shareholders
Non-controlling interests

Segment assets 4 
Investments in associated companies 
Segment liabilities 
Capital expenditure 7 

Adjusted EBITDA 
Percentage of consolidated revenues 
Percentage of consolidated assets 
Percentage of consolidated assets excluding

associated companies

Percentage of consolidated Adjusted EBITDA

  $

  $

  $

  $

  $

  $

1,365 
(157)  
— 
10 
(166)  
1 
— 
31 
(45)  
(14)   $

  $

509 
(15)  
— 
4 
19 
— 
— 
47 
(12)  
35 

  $

  $

  $

(29)  
15 
4,217 
8 
3,462 
262 
3438    $
73% 
82% 

86% 
87% 

  $

32 
3 
600 
— 
542 
28 
779    $
27% 
12% 

12% 
19% 

— 
— 
— 
— 
— 
(143)  
— 

(143)   $

— 

(143)   $

  $

(143)  
— 
— 
118 
— 
— 

  $

— 
—% 
2% 

—% 
—% 

— 
— 
(72)
17 
17 
(44)
(130)
(270)
(2)
(272)

  $

  $

  $

  $

— 
— 
— 
(12)  
(12)  
— 
— 
— 
— 
— 

  $

  $

  $

(272)
— 
1135  
82 
2406  
— 
(24) 10  $
—%  
4%  

2%  
(6)%  

  $

— 
— 
— 
— 
— 
— 

  $

— 
—% 
—% 

—% 
—% 

1,874 
(172)
(72)
19 
190 
(186)
(130)
(335)
(59)
(394)

(412)
18 
4,930 
208 
4,244 
290 

396 
100%
100%

100%
100%

Includes the results of Primus and HelioFocus; the results of ZIM, as an associated company; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment financing income and expenses.

1. Associated company.
2.
3.
4. Excludes investments in associates.
5.
6.
7.
8. With respect to IC Power Generation’s Adjusted EBITDA for the year ended December 31, 2016, Kenon defines “Adjusted EBITDA” as net income for the period before depreciation and

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of Property, Plant and Equipment, or PP&E, and intangibles based on an accrual basis.

amortization, finance expenses, net, and income tax expense, excluding share in (income) of associate. Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting
principles as a measure of financial performance and should not be considered as a substitute for net income or loss, cash flow from operations or other measures of operating performance or
liquidity determined in accordance with IFRS. Adjusted EBITDA is not intended to represent funds available for dividends or other discretionary uses by us because those funds may be required for
debt service, capital expenditures, working capital and other commitments and contingencies. Adjusted EBITDA presents limitations that impair its use as a measure of our profitability since it does
not take into consideration certain costs and expenses that result from our business that could have a significant effect on net income, such as financial expenses, taxes, depreciation, capital expenses
and other related charges. The following table sets forth a reconciliation of IC Power Generation’s net income to its Adjusted EBITDA for the period presented. Other companies may calculate
EBITDA differently, and therefore this presentation of Adjusted EBITDA may not be comparable to other similarly titled measures used by other companies.

3

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Net income for the period   
Depreciation and amortization   
Financing expenses, net   
Income tax expense   
Share in (income) of associate   

Adjusted EBITDA   

Year Ended
December 31,
2016
($ millions)

  $

  $

(14)
157 
156 
45 
(1)

343 

9. With respect to IC Power Distribution’s Adjusted EBITDA for the year ended December 31, 2016, Kenon defines “Adjusted EBITDA” as net income for the period before depreciation and

amortization, finance expenses, net, and income tax expense. Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting principles as a measure of financial
performance and should not be considered as a substitute for net income or loss, cash flow from operations or other measures of operating performance or liquidity determined in accordance with
IFRS. Adjusted EBITDA is not intended to represent funds available for dividends or other discretionary uses by us because those funds may be required for debt service, capital expenditures,
working capital and other commitments and contingencies. Adjusted EBITDA presents limitations that impair its use as a measure of our profitability since it does not take into consideration certain
costs and expenses that result from our business that could have a significant effect on net income, such as financial expenses, taxes, depreciation, capital expenses and other related charges. The
following table sets forth a reconciliation of IC Power Distribution’s net income to its Adjusted EBITDA, as reported by Kenon, for the periods presented. Other companies may calculate EBITDA
differently, and therefore this presentation of Adjusted EBITDA may not be comparable to other similarly titled measures used by other companies.

Net income for the period   
Depreciation and amortization   
Financing expenses, net   
Income tax expense   

Adjusted EBITDA   

Year Ended December
31,
2016
($ millions)

  $

  $

35 
15 
15 
12 

77 

10. With respect to its “Other” reporting segment, Kenon defines “Adjusted EBITDA” as net income (loss) for the period before finance expenses, net, depreciation and amortization, impairment of

assets and investments, provision of financial guarantees and income tax expense, excluding gain from distribution of dividend in kind and share in (income) loss of associated companies, net of tax.
Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting principles as a measure of financial performance and should not be considered as a substitute for net
income or loss, cash flow from operations or other measures of operating performance or liquidity determined in accordance with IFRS. Adjusted EBITDA is not intended to represent funds
available for dividends or other discretionary uses by us because those funds may be required for debt service, capital expenditures, working capital and other commitments and contingencies.
Adjusted EBITDA presents limitations that impair its use as a measure of our profitability since it does not take into consideration certain costs and expenses that result from our business that could
have a significant effect on net income, such as financial expenses, taxes, depreciation, capital expenses and other related charges. The following table sets forth a reconciliation of our “Other”
reporting segment’s income (loss) to its Adjusted EBITDA for the periods presented. Other companies may calculate EBITDA differently, and therefore this presentation of Adjusted EBITDA may
not be comparable to other similarly titled measures used by other companies.

Net income (loss) for the period   
Finance expenses, net  
Depreciation and amortization   
Impairment of assets and investments
Provision of financial guarantees  
Income tax expense   
Gain from distribution of dividend in kind
Share in (income) loss from associated companies, net of tax
Adjusted EBITDA   

2016

  $

  $

4

  $

(272)   $

Year Ended December 31,
2015
(in millions of USD)
205 
7 
1 
7 
— 
— 
(210)  
(9)  
1 

— 
— 
72 
130 
2 
— 
44 
(24)   $

  $

2014

(41)
(29)
— 
13 
— 
4 
— 
10 
(43)

 
 
 
 
 
 
 
 
 
   
   
   
   
 
   
  
 
 
 
 
 
 
 
 
 
 
 
   
   
   
 
   
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31, 2015

IC Power

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

Sales 
Depreciation and amortization
Asset impairment
Financing income
Financing expenses
Share in (losses) income of associated companies
Gain from distribution of dividend in kind
Income (loss) before taxes
Income taxes 
Income (loss) from continuing operations

Attributable to:

Kenon’s shareholders
Non-controlling interests

Segment assets 5 
Investments in associated companies
Segment liabilities
Capital expenditure 8

Adjusted EBITDA
Percentage of consolidated revenues
Percentage of consolidated assets
Percentage of consolidated assets excluding associated companies
Percentage of consolidated Adjusted EBITDA

  $

  $

  $

  $

  $

  $

  $

  $

  $

1,294 
(119)
— 
10 
(115)
— 
— 
149 
(62)
874  

63 
24 
4,069 
9 
3,063 
533 

3724,9    $
100%  
91%  
99%  
100%  

  $

— 
— 
— 
— 
— 
(196)  
— 

(196)   $

— 

(196)   $

  $

(196)  
— 
— 
159 
— 
— 

  $

— 
— 
4% 
— 
— 

— 
(1)
(7)
3 
(9)
9 
210 
205 
— 
205 

  $

  $

  $

206 
(1)
456     $
201 
1567    
— 

110    $
— 
5%  
1%  
— 

(5)   $
— 
— 
— 
— 
— 
— 
— 
— 
— 

  $

  $

  $

  $

— 
— 
— 
— 
— 
— 

— 
— 
— 
— 
— 

1,289 
(120)
(7)
13 
(124)
(187)
210 
158 
(62)
96 

73 
23 
4,114 
369 
3,219 
533 

373 
100%
100%
100%
100%

1. Associated company.
2.

3.
4.

Includes the results of Primus and HelioFocus; the results of ZIM and Tower (up to June 30, 2015), as associated companies; as well as Kenon’s and IC Green’s holding company and general and
administrative expenses.
“Adjustments” includes inter-segment sales.
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

5. Excludes investments in associates.
6.
7.
8.
9. Kenon defines IC Power’s “Adjusted EBITDA” as net income for the period before depreciation and amortization, finance expenses, net, asset impairment and income tax expense, excluding share
in (income) of associated companies, gain on bargain purchase and gain from disposal of investees. Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting
principles as a measure of financial performance and should not be considered as a substitute for net income or loss, cash flow from operations or other measures of operating performance or
liquidity determined in accordance with IFRS. Adjusted EBITDA is not intended to represent funds available for dividends or other discretionary uses by us because those funds may be required for
debt service, capital expenditures, working capital and other commitments and contingencies. Adjusted EBITDA presents limitations that impair its use as a measure of our profitability since it does
not take into consideration certain costs and expenses that result from our business that could have a significant effect on net income, such as financial expenses, taxes, depreciation, capital expenses
and other related charges. The following table sets forth a reconciliation of IC Power’s net income (loss), as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the periods
presented. Other companies may calculate EBITDA differently, and therefore this presentation of Adjusted EBITDA may not be comparable to other similarly titled measures used by other
companies.

10. Adjusted EBITDA is a non-IFRS measure. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see footnote 10 to the preceding table setting forth the

selected financial data for the year ended December 31, 2015.

Net income for the period   
Depreciation and amortization   
Financing expenses, net   
Asset impairment  
Income tax expense   
Share in (income) of associated companies
Gain on bargain purchase   
Gain from disposal of investees  

Adjusted EBITDA   

2016

Year Ended December 31,
2015
($ millions)

2014

  $

  $

21 
172 
171 
— 
57 
(1)  
— 
— 

  $

420 

  $

5

  $

87 
119 
104 
— 
62 
— 
— 
— 

372 

222 
108 
123 
35 
99 
(14)
(68)
(157)

348 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
Sales 
Depreciation and amortization 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Asset impairment 
Gain from disposal of investee 
Gain from bargain purchase 
Income (loss) before taxes 
Income taxes 
Income (loss) from continuing operations

Attributable to:

Kenon’s shareholders 
Non-controlling interests 

Segment assets 6 
Investments in associated companies 
Segment liabilities 
Capital expenditure 9 

Adjusted EBITDA 
Percentage of combined revenues 
Percentage of combined assets 
Percentage of combined assets excluding associated companies
Percentage of combined Adjusted EBITDA 

  $

  $

  $

  $

  $

IC Power

1,358 
(108)
9 
(132)
14 
(35)
157 
68 
321 
(99)
2225  

  $

  $

  $

  $

197 
25 
3,832 
10 
2,860 
593 
3485,10    $
99%  
89%  
99%  
114%  

Year Ended December 31, 2014 1

Qoros 2

Other 3
(in millions of USD, unless otherwise indicated)

Adjustments 4

Combined Carve-
Out Results

  $

— 
— 
— 
— 
(175)  
— 
— 
— 
(175)   $
— 
(175)   $

  $

(175)  
— 
— 
221 
— 
— 

  $

— 
— 
— 
— 
— 

— 
— 
39 
(10)
(10)
(13)
— 
— 
(37)
(4)
(41)

  $

  $

  $

  $

(34)
(7)
8377  
205 
8068  
12 
(43) 11  $
— 
23%  
21%  
(14)%  

  $

  $

  $

  $

14 
— 
(32)
32 
— 
— 
— 
— 
— 
— 
— 

— 
— 
(785)
— 
(785)
— 

— 

  $

1%  
(12)% 
(20)% 
— 

1,372 
(108)
16 
(110)
(171)
(48)
157 
68 
109 
(103)
6 

(12)
18 
3,884 
436 
2,881 
605 

305 
100%
100%
100%
100%

1. During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in IC Power.

Kenon’s and IC Power’s financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.

2. Associated company.
3.

4.

5.

Includes financing income from former parent company loans to Kenon’s subsidiaries; the results of Primus, HelioFocus (from June 30, 2014) and ZIM (up to June 30, 2014); the results of ZIM
(from June 30, 2014), Tower and HelioFocus (up to June 30, 2014), as associated companies; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment sales, and the consolidation entries. For the purposes of calculating the “percentage of combined assets” and the “percentage of combined assets excluding
associated companies,” “Adjustments” has been combined with “Other.”
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges .”

6. Excludes investments in associates.
7.
8.
9.
10. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, see footnote 9 to the preceding table

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

setting forth selected financial data for the year ended December 31, 2014.

11. Adjusted EBITDA is a non-IFRS measure. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see footnote 10 to the preceding table setting forth the

selected financial data for the year ended December 31, 2014.

6

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power

The following tables set forth other financial and key operating data for IC Power for the periods presented:

Net income from continuing operations 2 
Net income for the period 
Adjusted EBITDA 4 
Net Debt 5 
Installed capacity of operating companies and associated companies at end of

period (MW)

Proportionate capacity of operating companies and associated companies at end

of period (MW)

Weighted average availability during the period (%) 
Gross energy generated (GWh) 
Energy sold under PPAs (GWh) 

IC Power Ltd.
(formerly known
as IC Power Pte.
Ltd.)

2016

21 
21 
420 
2,764 

3,945 

3,152 
84 
14,208 
14,582 

I.C. Power Asia Development Ltd. 
(formerly known as I.C. Power Ltd.)

2015

Year Ended December 31,
2014 1
($ millions, except as otherwise indicated)

2013 1

49 
523   
3263   

1,903 

2,665 

2,170 

95% 

13,109 
13,748 

128 
2563   
3953   

1,557 

2,642 

2,108 

94% 

13,156 
14,220 

2012 1

39 
68 
154 
1,001 

1,572 

1,198 

93%

6,339 
5,365 

45 
74 
247 
1,143 

2,070 

1,608 

94% 

8,820 
9,217 

1. During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in ICP. ICP’s

financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.

2. The share in net income attributable to non-controlling interests held by third parties in IC Power’s subsidiaries was $18 million, $17 million, $29 million, $13 million and $10 million for the years

3.

4.

ended December 31, 2016, 2015, 2014, 2013 and 2012, respectively.
IC Power’s Adjusted EBITDA and net income, as reported by Kenon, for the years ended December 31, 2015 and 2014 differ from the amounts reported by IC Power for the same period as a result
of the adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5.
Operating and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges. ”
IC Power defines “Adjusted EBITDA” for each period as net income (loss) for the period before depreciation and amortization, financing expenses, net, income tax expense and asset write-off,
excluding share in (income) loss of associated companies, gain on bargain purchase, capital gains (excluding capital gains from sales of fixed assets), and net income from discontinued operations,
net of tax (excluding dividends received from discontinued operations).

Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting principles as a measure of financial performance and should not be considered as a substitute for net
income or loss, cash flow from operations or other measures of operating performance or liquidity determined in accordance with IFRS. Adjusted EBITDA is not intended to represent funds
available for dividends or other discretionary uses because those funds may be required for debt service, capital expenditures, working capital and other commitments and contingencies. Adjusted
EBITDA presents limitations that impair its use as a measure of IC Power’s profitability since it does not take into consideration certain costs and expenses that result from its business that could
have a significant effect on IC Power’s net income, such as finance expenses, taxes and depreciation.

The following table sets forth a reconciliation of IC Power’s net income to its Adjusted EBITDA for the periods presented. Other companies may calculate Adjusted EBITDA differently, and
therefore this presentation of Adjusted EBITDA may not be comparable to other similarly titled measures used by other companies:

IC Power Ltd.
(formerly
known as 
IC Power Pte.
Ltd.)

I.C. Power Asia Development Ltd. 
(formerly known as I.C. Power Ltd.)

Year Ended December 31,

  $

Net income (loss) for the period
Depreciation and amortization (iii)
Financing expenses, net 
Income tax expense 
Asset write-off 
Share in (income) loss of associated

companies

Gain on bargain purchase 
Capital gains (excluding capital gains

from sales of fixed assets)

Net (income) loss from discontinued
operations, net of tax (excluding
dividends received from
discontinued operations)

Adjusted EBITDA 

  $

2016

2015

2014 (i)

2013 (i)

2012 (i)

2011

2010 (ii)

2009 (ii)

  $

21 
172 
171 
57 
— 

(1)  
— 

— 

  $

52 
119 
104 
50 
— 

— 
— 

— 

  $

256 
108 
119 
63 
35 

(2)
(71) (iv)   

— 

($ millions)
  $
74 
76 
80 
48 
— 

(2)  
(1)  

— 

  $

68 
55 
44 
18 
— 

(2)  
— 

— 

  $

73 
41 
36 
16 
— 

(2)  
(24)  

— 

  $

36 
28 
24 
6 
— 

(1)  
— 

— 

— 
420 

  $

—(v)   
326 

  $

(113) (vi)   
395 

  $

(28)  
247 

  $

(29)  
154 

  $

(20)  
120 

  $

(11)  
82 

  $

66 
26 
18 
8 
— 

(1)
— 

(35)

(17)
65 

(i) During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in ICP. ICP’s

financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.

(ii) IC Power was incorporated in January 2010. Financial data for the year ended December 31, 2010 reflects the consolidated results of Inkia and OPC-Rotem from April 1, 2010 and June 30,

2010, respectively, the time of their transfer to IC Power.

(iii) Includes depreciation and amortization expenses from cost of sales and general, selling and administrative expenses.
(iv) Includes $68 million of income from gain on bargain purchase and $3 million of income from the measurement of fair value.
(v) Excludes $4 million received from Enel Generación Perú post-equity method accounting, which is reflected as “dividends received post-equity accounting” in IC Power’s discontinued

operations for that period, but is included in net income (loss) for the period, so is therefore included in Adjusted EBITDA for the period.

(vi) Excludes $15 million received from Enel Generación Perú post-equity method accounting, which is reflected as “other income” in IC Power’s discontinued operations for that period, but is

included in net income (loss) for the period, so is therefore included in Adjusted EBITDA for the period.

7

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5. Net Debt is calculated as total debt, excluding debt owed to Kenon, minus cash and short term deposits and restricted cash. Net Debt is not a measure recognized under IFRS. The table below sets

forth a reconciliation of IC Power’s total debt to net debt.

IC Power Ltd.
(formerly known
as 
IC Power Pte.
Ltd.)

I.C. Power Asia Development Ltd. 
(formerly known as I.C. Power Ltd.)

2016

2015

As of December 31,
2014
($ millions)

2013

2012

  $

  $

3,072 
308 
2,764 

  $

  $

2,565 
662 
1,903 

  $

  $

2,348 
791 
1,557 

  $

  $

1,669 
526 
1,143 

  $

  $

1,266 
265 
1,001 

Total debt (i) 
Cash (ii) 
Net Debt 

__________________

(i) Total debt comprises loans from banks and third parties and debentures, excluding liabilities of disposal group classified as held for sale and loans owed to Kenon, and includes long term and

short term debt.

(ii) Includes short-term deposits and restricted cash of $106 million, $302 million, $208 million, $9 million and $81 million at December 31, 2016, 2015, 2014, 2013 and 2012, respectively.

6. Figure is derived from IC Power’s audited statements of financial position as of December 31, 2016.

Set forth below is a summary of certain key historical financial and other operational information, according to IC Power business lines and segments, for the periods set forth below. For all

periods prior to its acquisition of Energuate, IC Power operated one business line (generation) and evaluated this business line according to four geographic segments. However, since January 22, 2016,
the date on which IC Power completed acquisition of Energuate, its results of operations reflect an additional business line (distribution). IC Power’s distribution business consists entirely of DEORSA
and DEOCSA. Guatemel and RECSA, which IC Power also acquired on January 22, 2016, are included within its generation business and have been included in IC Power’s Central America and Other
segment, respectively, as a result of their business lines.

Generation

Distribution

Adjustments

Consolidated 
Results

Year Ended December 31, 2016

Peru

Israel

Sales 
Cost of Sales 
Operating income (loss) 
Operating margins 
Financing expenses, net 
Net income (loss) for the

period 

Installed capacity of operating
companies and associated
companies at end of period
(MW) 

Proportionate capacity of

operating companies at end
of period (MW) 

Gross energy generated (GWh)  
Energy sold under PPAs

(GWh) 

528 
(323)  
129 
24% 
(63)  

33 

2,189 

1,735 
6,811 

6,691 

356 
(282)  
40 
11% 
(16)  

24 

458 

418 
3,589 

3,996 

Central 
America

Other 1
($ millions, except as otherwise indicated)

Guatemala

326 
(252)  
21 
6% 
(12)  

4 

596 

531 
1,898 

2,815 

157 
(101)
(15)
(10)% 
(65)

(84)

651 

601 
1,910 

1,080 

509 
(403)  
63 
12% 
(15)  

35 

- 

- 
- 

- 

(2)
2 
10 
(500)% 
- 

9 

- 

- 
- 

- 

1,874 
(1,359)
248 

13%
(171)

21 

3,945 

3,152 
14,208 

14,582 

1.

In addition to the results of certain of its generation assets, IC Power’s Other segment also includes expenses and other adjustments relating to its headquarters and intermediate holding companies,
including purchase price allocations recorded in connection with our acquisition of Energuate, which allocations were recorded by Inkia, one of its intermediate holding companies. However, as IC
Power’s Other segment is primarily composed of the financial results of certain of its generation assets and their related holding companies, IC Power analyzes the results of its Other segment within
discussion of the results of its generation business.

8

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Sales 
Cost of Sales 
Operating income 
Operating margins 
Financing expenses, net 
Net income (loss) for the period 

 $

 $

Installed capacity of operating companies and

associated companies at end of period (MW) 
Proportionate capacity of operating companies at end

of period (MW) 

Gross energy generated (GWh) 
Energy sold under PPAs (GWh) 

Year Ended December 31, 2015

Peru

Israel

Central 
America

Other 1

Adjustments

Consolidated 
Results

 $

448 
(279)
102 
23%   
(42)
31 

 $

 $

326 
(242)
53 
16%   
(23)
22 

 $

($ millions, except as otherwise indicated)
178 
 $
(123)
(1)
— 
(29)
(31)

337 
(265)
39 
12%   
(10)
23 

 $

1,063 

797 
5,166 
6,327 

458 

370 
3,837 
3,976 

504 

436 
2,208 
2,450 

640 

567 
1,898 
995 

 $

 $

 $

— 
— 
10 
— 
— 
8 

— 

— 
— 
— 

1,289 
(909)
203 

16%
(104)
52 

2,665 

2,170 
13,109 
13,748 

1.

In addition to the results of certain of its generation assets, IC Power’s Other segment also includes expenses and other adjustments relating to its headquarters and intermediate holding companies.

Peru

Israel

Year Ended December 31, 2014
Central 
America

Other 1

Adjustments

Consolidated 
Results

Sales 
Cost of Sales 
Operating income 
Operating margins 
Financing expenses, net 
Net income for the period 

 $

 $

Installed capacity of operating companies and

associated companies at end of 
period (MW) 

Proportionate capacity of operating companies at end

of period (MW) 

Gross energy generated (GWh) 
Energy sold under PPAs (GWh) 

 $

437 
(270)
108 
25%   
(34)
45 

 $

 $

413 
(252)
127 
31%   
(30)
71 

 $

($ millions, except as otherwise indicated)
214 
 $
(154)
43 
20%   
(46)
124 

308 
(260)
21 
7%   
(8)
9 

 $

 $

1,063 

797 
5,920 
6,324 

440 

352 
3,465 
3,973 

504 

395 
1,965 
2,694 

635 

564 
1,806 
1,229 

 $

 $

— 
— 
9 
— 
(1)
7 

— 

— 
— 
— 

1,372 
(936)
308 

22%
(119)
256 

2,642 

2,108 
13,156 
14,220 

1.

In addition to the results of certain of its generation assets, IC Power’s Other segment also includes expenses and other adjustments relating to its headquarters and intermediate holding companies.

B.            Capitalization and Indebtedness

Not applicable.

C.            Reasons for the Offer and Use of Proceeds

Not applicable.

D.            Risk Factors

Our business, financial condition, results of operations and liquidity can suffer materially as a result of any of the risks described below. While we have described all of the risks we consider

material, these risks are not the only ones we face. We are also subject to the same risks that affect many other companies, such as technological obsolescence, labor relations, geopolitical events,
climate change and risks related to the conducting of international operations. Additional risks not known to us or that we currently consider immaterial may also impair our business operations. Our
businesses routinely encounter and address risks, some of which may cause our future results to be different—sometimes materially different—than we presently anticipate.

9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
 
 
 
 
 
 
Risks Related to Our Strategy and Operations

Some of our businesses have significant capital requirements. If these businesses are unable to obtain sufficient financing from third party financing sources or renew or refinance their working

capital facilities, they may not be able to operate, and we may deem it necessary to provide such capital, provide a guarantee or indemnity in connection with any financings, provide collateral in
connection with any financings, including via the cross-collateralization of assets across businesses, or we may refrain from investing further in any such businesses, all of which may materially impact
our financial position and results of operations.

The business plans of our businesses contemplate additional debt or equity financing which is expected to be raised from third parties. However, our businesses may be unable to raise the

necessary capital from third party financing sources, and in this case Kenon would be their only source of funding. For example, Qoros will require additional cash to further its development and, until it
achieves significant sales levels, to meet its operating expenses, financing expenses, and capital expenditures. For further information on Qoros’ liquidity requirements, see   “ —Qoros will require
additional capital resources to meet its operating expenses. ”

In the event that Qoros or one or more of our other businesses require capital, either in accordance with their business plans or in response to new developments or to meet operating expenses,

and such businesses are unable to raise such financing, Kenon may (i) issue equity in the form of shares or convertible instruments (through a pre-emptive offering or otherwise), (ii) provide financing to
a business using funds received from the operations or sales of Kenon’s other businesses, (iii) sell part, or all, of its interest in any of its businesses, (iv) raise debt financing at the Kenon level or (v)
provide guarantees or collateral in support of the debt of its businesses. To the extent debt financing is available to it, any debt financing that Kenon incurs may not be on favorable terms, may require
Kenon to agree to restrictive covenants that limit how Kenon manages its investments in its businesses, and may also limit dividends or other distributions by Kenon. In addition, any equity financing,
whether in the form of a sale of shares or convertible instruments, would dilute existing holders of our ordinary shares and any such equity financing could be at prices that are lower than the current
trading prices.

In the future, third party financing sources may also require Kenon to guarantee an individual business’ indebtedness and/or provide additional collateral, including collateral via a cross-

collateralization of assets across businesses. To the extent Kenon guarantees an individual business’ indebtedness, it may divert funds received from one business to another business. We may also sell
some or all of our interests in any of our businesses to provide funding for another business. Additionally, if we cross-collateralize certain assets (i.e., pledging shares or assets of one of our businesses to
secure debt of another of our businesses) in order to provide additional collateral to a lender, we may lose an asset associated with one business in the event that a separate business is unable to meet its
debt obligations. Furthermore, if Kenon provides any of our businesses with additional capital, provides any third parties with indemnification rights or a guarantee, and/or provides additional collateral,
including via cross-collateralization, this could reduce our liquidity. For further information on the capital resources and requirements of each of our businesses, see “ Item 5.B Liquidity and Capital
Resources. ”

Qoros will require additional capital resources to meet its operating expenses.

Qoros commenced commercial operations at the end of 2013. Qoros has incurred losses since inception and is continuing to experience losses and negative operating cash flow and expects that

this will continue until it achieves significantly higher levels of sales. Qoros’ operating expenses, debt service requirements, capital expenditures and other liquidity requirements are significant. Until
Qoros experiences a significant increase in sales, it will continue to require additional financing, including the renewal or refinancing of its working capital facilities, to meet these expenses and
requirements, and there is no assurance that Qoros will experience an increase in sales in the near-term, if at all.

Qoros has historically relied upon capital contributions, loans, guarantees and pledges from its shareholders (Chery Automobile Co. Ltd, or Chery, and Kenon), and third party loans supported
by its shareholders, to fund its development and operations. Qoros’ shareholders have made equity contributions in the aggregate amount of RMB10.4 billion and loans in the amount of RMB1.8 billion
(including loans of RMB450 million from Ansonia to Quantum used to make back-to-back loans in the same amount to Qoros), Chery has guaranteed RMB2,200 million principal amount of Qoros debt
(plus interest and fees) and Kenon has outstanding back-to-back guarantees to Chery for up to RMB425 million, plus certain interest and fees. For further information on the guarantees provided by
Kenon in respect of Qoros’ debt, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Liquidity and Capital Resources—Kenon’s Commitments and Obligations—Back-to-Back Guarantees
Provided to Chery .”

Qoros’ cash flows from operations are not sufficient to meet its operating expenses and debt service requirements at this time, and it does not expect to generate sufficient cash flows from
operations to meet such liquidity requirements until it achieves a significant increase in sales, and it may not experience an increase in sales in the near-term or at all. Qoros’ available liquidity and
capital resources are limited, and it has significant obligations. As of December 31, 2016, Qoros had total loans and borrowings (excluding shareholder loans) of RMB5.5 billion and current liabilities
(excluding shareholder loans) of RMB4.0 billion, including trade and other payables of RMB2.7 billion. As of December 31, 2016, Qoros had current assets of RMB1.8 billion, including cash and cash
equivalents of RMB465 million. Qoros has long-term, short-term and working capital credit facilities, but amounts available under such facilities are limited. Qoros actively manages its trade payables,
accrued expenses and other operating expenses in connection with the management of its liquidity requirements and resources.

10

 
 
 
 
 
 
 
 
 
Qoros is continuing to seek additional financing for its operations. For example, in April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may
invest significant amounts in Qoros, subject to government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other agreements. For further
information on this arrangement, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”
Qoros will need to secure additional financing to meet its operating expenses (including accounts payable) and debt service requirements. If Qoros is not able to obtain financing from Yibin or otherwise
raise additional financing as required, it may be unable to continue operations, in which case Kenon may lose its entire investment in Qoros and Kenon may be required to make payments under its back-
to-back guarantees to Chery in respect of Qoros’ bank debt and pledges over Qoros shares by Quantum may be enforced. Alternatively, Chery or other investors may choose to make additional
investments in Qoros (without a corresponding Kenon investment) which may result in a dilution of Kenon’s interest. For further information, see “ —Some of our businesses have significant capital
requirements. If these businesses are unable to obtain sufficient financing from third party financing sources or renew or refinance their working capital facilities, they may not be able to operate, and
we may deem it necessary to provide such capital, provide a guarantee or indemnity in connection with any financings, provide collateral in connection with any financings, including via the cross-
collateralization of assets across businesses, or we may refrain from investing further in any such businesses, all of which may materially impact our financial position and results of operations .”

Kenon has significant repayment obligations under the IC Credit Facility.

In connection with the spin-off, IC provided Kenon with a $200 million credit facility, or the IC Credit Facility. During the initial five-year term of the IC Credit Facility, Kenon has agreed to
pay IC an annual commitment fee equal to 2.1% of the undrawn amount of the credit facility, which will be capitalized as a payment-in-kind and added to the outstanding amount of the credit facility.
Principal and interest payments accrue annually, and become due and payable in accordance with the terms of the credit facility, with interest payments over the first five-years being paid-in-kind.

Kenon has pledged 66% of its interest in IC Power and IC Power has pledged 66% of its interest in ICP to secure Kenon’s obligations under the IC Credit Facility, which is now fully drawn.
Kenon may be required to use a substantial portion of cash flows received from its businesses to make payments to IC in accordance with the IC Credit Facility, which may reduce Kenon’s ability to
advance cash to its businesses or to pay dividends to its shareholders in the future, and Kenon may be unable to generate sufficient cash to make such payments. If Kenon is unable to fulfill its payment
obligations under the terms of the loan, IC could elect to declare all amounts outstanding thereunder immediately due and payable and terminate all commitments to extend further credit to Kenon. If IC
accelerates the repayment of Kenon’s obligations (including any acceleration resulting if Kenon fails to make payments under its back-to-back guarantees to Chery), Kenon may not have sufficient
liquidity to repay such obligations. For further information on the risks related to Kenon’s back-to-back guarantee obligations in respect of Qoros’ indebtedness, see “— Risks Related to Our Interest In
Qoros—Kenon has “back-to-back” guarantee obligations to Chery in respect of guarantees that Chery has given for Qoros’ bank debt and has pledged a substantial portion of its interests in Qoros to
secure Qoros’ bank debt .” In such circumstances, Kenon would need to raise external financing to repay this facility to avoid losing the shares in IC Power that it has pledged.

Kenon may also need to raise debt financing or issue equity, and such issuance could result in a full, or partial, dilution of your direct equity interest in Kenon or indirect equity interest in

Kenon’s businesses. The IC Credit Facility also contains covenants that restrict our ability to make distributions and incur additional indebtedness. For example, prior to a listing of IC Power’s equity,
the IC Credit Facility prohibits Kenon from distributing dividends to its shareholders, unless such dividends consist of all, or a portion of, Kenon’s equity interests in ZIM. Additionally, there are further
restrictions on dividends following an initial public offering or listing of IC Power. If, at any time after a listing of IC Power’s equity, we seek to (i) distribute a dividend to our shareholders (in cash or in
kind), (ii) incur additional debt, (iii) sell, transfer, or allocate a portion, or all, of our interest in IC Power, or (iv) sell all of IC Power’s assets, the IC Credit Facility will require the value of Kenon’s
remaining interest in IC Power to be, at any given time, equal to at least two times Kenon’s net debt (which shall be equal to the outstanding principal amount of the credit facility plus the outstanding
principal amount of any additional debt owed by Kenon to third parties minus Kenon’s cash on hand), in each case plus interest and fees. Kenon’s compliance with such terms may limit its operating and
financial flexibility, which may affect Kenon’s ability to execute its strategy and thereby have a material adverse effect on Kenon’s business, financial condition, results of operations or liquidity. For
further information on the terms of the loan from IC to Kenon, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Liquidity and Capital Resources—Kenon’s Commitments and Obligations—IC
Credit Facility .”

As of December 31, 2016, Kenon had approximately $102 million in cash on an unconsolidated basis  (of which approximately $57 million was used in March 2017 to fund shareholder loans to

Qoros). Kenon has also fully drawn the IC Credit Facility. Kenon is dependent on its businesses for cash flows from operations and to meet its obligations under the IC Credit Facility and its other
obligations, including its obligations under our back-to-back guarantees to Chery with respect to Qoros’ bank debt. For further information on the risks related to Kenon’s dependence on its businesses
for its liquidity, see “ —We are a holding company and are dependent upon cash flows from our businesses to meet our existing and future obligations .”

11

 
 
 
 
 
 
Disruptions in the financial markets could adversely affect Kenon or its businesses, which may not be able to obtain additional financing on acceptable terms or at all.

Kenon’s businesses may seek to access capital lending markets for various purposes, which may include raising funding for the repayment of indebtedness, acquisitions, capital expenditures

and for general corporate purposes. The ability of Kenon’s businesses to access capital lending markets, and the cost of such capital, could be negatively impacted by disruptions in those markets. Capital
markets have demonstrated significant volatility in recent years. These disruptions impacted other areas of the economy and led to a slowdown in general economic activity. Similar disruptions in the
credit markets could make it more difficult or expensive for our businesses to access the capital or lending markets if the need arises and may make financing terms for borrowers less attractive or
available. Furthermore, a decline in the value of any of our businesses, which are or may be used as collateral in financing agreements, could also impact their ability to access financing.

Kenon may seek to access the capital or lending markets to obtain financing in the future, including to support its businesses. The availability of such financing and the terms thereof will be

impacted by many factors, including: (i) our financial performance, (ii) our credit ratings or absence of a credit rating, (iii) the liquidity of the overall capital markets, and (iv) the state of the economy.
There can be no assurance that Kenon will be able to access the capital markets on acceptable terms or at all. If Kenon deems it necessary to access financing and is unable to do so on acceptable terms
or at all, this could have a material adverse effect on our financial condition or liquidity.

We are dependent upon access to the capital markets to execute our strategy.

Our strategy may include sales or distributions of our interests in our businesses. Our ability to distribute or monetize our businesses is heavily dependent upon the public equity markets
including our ability to complete an initial public offering or listing of one or more of our businesses. For example, in January 2017, IC Power commenced a roadshow for an initial public offering of IC
Power's ordinary shares; however, in light of market conditions, IC Power withdrew its IPO, as the IPO was not deemed to be in the best interests of IC Power and Kenon at such time.

Even if the securities of our business are publicly traded, large holdings of securities can often be disposed of only over a substantial length of time, exposing the investment returns to risks of
downward movement in market prices during the intended disposition period. Accordingly, under certain conditions, we may be forced to either sell our equity interest in a particular business at lower
prices than expected to realize or defer such a sale, potentially for a long period of time.

We are a holding company and are dependent upon cash flows from our businesses to meet our existing and future obligations.

We are a holding company of various operating companies, and as a result, do not conduct independent operations or possess significant assets other than investments in and advances to our

businesses. We have significant obligations and limited liquidity, and as a result, we will depend on funds from our businesses or external financing to meet our obligations.

As of December 31, 2016, Kenon had approximately $102 million in cash on an unconsolidated basis (of which approximately $57 million was used in March 2017 to fund shareholder loans to

Qoros), and had fully drawn the IC Credit Facility. We will depend on funds from our subsidiaries or associated companies (or from sales of interests in subsidiaries and associated companies) to repay
the IC Credit Facility as well as any interest and fees outstanding on the loan, and, for so long as the loan remains outstanding, to make payments of interest on the loan and to make any payments we
may be required to make under the back-to-back guarantees we have given to Chery in respect of Qoros’ bank debt.

In addition, as of the date of this annual report, Kenon has outstanding back-to-back guarantee obligations to Chery of up to RMB425 million, plus certain interest and fees, in respect of certain
of Qoros’ indebtedness. For further information on, and an overview of, the guarantees provided by Kenon in respect of Qoros’ debt, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Liquidity
and Capital Resources—Kenon’s Commitments and Obligations—Back-to-Back Guarantees Provided to Chery .”

Kenon may not have sufficient liquidity to satisfy payment obligations under the IC Credit Facility or its back-to-back guarantees if it is required to make payments on such guarantees. To make

such payments, Kenon would need to obtain such funds from its businesses, which may include IC Power (via dividends, loans or advances, or the repayment of loans or advances to us, which may be
funded by sales of assets or minority interests in our businesses), or obtain external financing, which may result in dilution of shareholders (in the event of equity financing) or additional debt obligations
for the company (in the event of debt financing). In the event that funds from its businesses or external financing are not available to meet such obligations on reasonable terms or at all, Kenon may need
to sell assets to meet such obligations, and its ability to sell assets may be limited in light of the various pledges over the shares and assets within its most valuable asset, IC Power. Any sales of assets
may not be at attractive prices, particularly if such sales must be made quickly to meet Kenon’s obligations.

12

 
 
 
 
 
 
 
 
 
 
Kenon has provided loans and guarantees in the past to support our businesses, such as Qoros, and may provide additional loans to or make investments in or provide guarantees in support of its

businesses. Kenon’s liquidity requirements will increase to the extent it makes further loans or grants additional guarantees to support its businesses.

In addition, as Kenon’s businesses are legally distinct from it and will generally be required to service their debt obligations before making distributions to Kenon, Kenon’s ability to access such

cash flow from its businesses may be limited in some circumstances and it may not have the ability to cause our entities to make distributions to Kenon, even if they are able to do so. Additionally, the
terms of existing and future joint venture, financing, or cooperative operational agreements and/or the laws and jurisdictions under which each of Kenon’s businesses are organized may also limit the
timing and amount of any dividends, other distributions, loans or loan repayments to Kenon. In the case of IC Power, which is a holding company of numerous businesses, its ability to make payments to
Kenon may be further limited if its businesses are unable to make payments to it.

Additionally, as dividends are generally taxed and governed by the relevant authority in the jurisdiction in which the company is incorporated, there may be numerous and significant tax or

other legal restrictions on the ability of Kenon’s businesses, including, for example, IC Power’s businesses and their ability to remit funds to IC Power or to us, or to remit such funds without incurring
significant tax liabilities or incurring a ratings downgrade.

We do not have the right to manage, and in some cases do not control, several of our businesses, and therefore we may not be able to realize some or all of the benefits that we expect to realize from our
businesses.

As we do not own a majority interest in Qoros, one of our primary assets, or ZIM, we are subject to the operating and financial risks of these businesses, the risk that these businesses may make
business, operational or financial decisions that we do not agree with, and the risk that we may have objectives that differ from those of the applicable business itself or its other shareholders. Our ability
to control the development and operation of these investments may be limited, and we may not be able to realize some or all of the benefits that we expect to realize from these investments. For example,
we may not be able to cause these businesses to make distributions to us in the amount or at the time that we need or want such distributions.

Furthermore, the loans that Ansonia made to our subsidiary Quantum (which were used by Quantum to make back-to-back loans to Qoros) may be converted into equity of Quantum at a

discount to the implied value of Qoros based upon the receipt of third-party financing. Accordingly, upon such conversion, Kenon’s indirect interest in Qoros will be diluted, which will result in
economic dilution and Kenon having less control over Qoros’ business. In connection with the loan agreement, Ansonia also has certain consent rights with respect to actions that we take in respect of
our interest in Qoros. For further information on Ansonia’s agreement to invest in Qoros, see “ Item 5. Operating and Financial Review and Prospects—Qoros—Material Indebtedness—Shareholder
Loans .”

In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional
vehicle manufacturing base. Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association,
among other agreements. Such further investment, if provided, is expected to dilute Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to
Qoros. For further information, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

In addition, we rely on the internal controls and financial reporting controls of our businesses and the failure of our non-controlled businesses to maintain effective controls or to comply with

applicable standards could make it difficult to comply with applicable reporting and audit standards. For example, the preparation of our consolidated financial statements requires the prompt receipt of
financial statements from each of our subsidiaries and associated companies, some of whom rely on the prompt receipt of financial statements from each of their subsidiaries and associated companies.
Additionally, in certain circumstances, we may be required to file with our annual report on Form 20-F, or a registration statement filed with the SEC, financial information of associated companies
which has been audited in conformity with SEC rules and regulations and relevant audit standards. We may not, however, be able to procure such financial statements, or such audited financial
statements, as applicable, from our subsidiaries and associated companies and this could render us unable to comply with applicable SEC reporting standards.

Some of our businesses are highly leveraged.

Some of our businesses are significantly leveraged and may incur additional debt financing in the future. As of December 31, 2016, IC Power had $3.1 billion of outstanding indebtedness,

Qoros had outstanding indebtedness of RMB5.5 billion (excluding shareholder loans), and ZIM had outstanding indebtedness of approximately $1.5 billion.

Highly leveraged assets are inherently more sensitive to declines in earnings, increases in expenses and interest rates, and adverse market conditions. A leveraged company’s income and net

assets also tend to increase or decrease at a greater rate than would otherwise be the case if money had not been borrowed. Consequently, the risk of loss associated with a leveraged company is generally
greater than for companies with comparatively less debt. Additionally, a significant portion of our businesses’ assets (including their interests in certain of their subsidiaries) have been pledged to secure
indebtedness, and as a result, the amount of collateral that is available for future secured debt or credit support and a business’ flexibility in dealing with its secured assets may be limited. IC Power uses
a substantial portion of its consolidated cash flows from operations to make debt service payments, thereby reducing its ability to use its cash flows to fund operations, capital expenditures, or future
business opportunities. Additionally, notwithstanding the completion of its restructuring on July 16, 2014, ZIM remains highly leveraged and will continue to face risks associated with those of a highly
leveraged company.

13

 
 
 
 
 
 
 
 
 
 
 
Our businesses will generally have to service their debt obligations before making distributions to us or to any other shareholder. In addition, many of the financing agreements relating to the

debt facilities of our operating companies contain covenants and limitations, including the following:

·

limits on the ratio of debt to EBITDA;

· minimum required ratios of EBITDA to interest expense;

· minimum equity;

·

·

·

limits on the incurrence of liens or the pledging of certain assets;

limits on the incurrence of subsidiary debt;

limits on the ability to enter into transactions with affiliates, including us;

· minimum liquidity and fixed charge cover ratios;

·

·

·

limits on the ability to pay dividends to shareholders, including us;

limits on our ability to sell assets, including interests in subsidiaries and associated companies; and

other non-financial covenants and limitations and various reporting obligations.

If any of our businesses are unable to repay or refinance their indebtedness as it becomes due, or if they are unable to comply with their covenants, we may decide to sell assets or to take other
actions, including (i) reducing financing in the future for investments, acquisitions or general corporate purposes or (ii) dedicating an unsustainable level of our cash flow from operations to the payment
of principal and interest on their indebtedness. As a result, the ability of our businesses to withstand competitive pressures and to react to changes in the various industries in which we operate could be
impaired. A breach of any of our businesses’ debt instruments and/or covenants could result in a default under the relevant debt instrument(s). Upon the occurrence of such an event of default, the
lenders could elect to declare all amounts outstanding thereunder to be immediately due and payable and, in the case of credit facility lenders, terminate all commitments to extend further credit. If the
lenders accelerate the repayment of the relevant borrowings, the relevant business may not have sufficient assets to repay any outstanding indebtedness, which could result in a complete loss of that
business for us. Furthermore, the acceleration of any obligation under a particular debt instrument may permit the holders of other material debt to accelerate their obligations pursuant to “cross default”
provisions, which could have a material adverse effect on our business, financial condition and liquidity.

As a result, our businesses’ degree of leverage could have a material adverse effect on our business, financial condition, results of operations or liquidity.

In addition, we have guarantee obligations with respect to certain Qoros debt and have pledged a substantial portion of our interest in Qoros to support certain Qoros debt, as well as Chery’s
guarantees of Qoros’ debt. See “— Risks Related to Our Interest In Qoros—Kenon has “back-to-back” guarantee obligations to Chery in respect of guarantees that Chery has given for Qoros’ bank
debt and has pledged a substantial portion of its interests in Qoros to secure Qoros’ bank debt. ”

Our success will be dependent upon the efforts of our directors and executive officers.

Our success will be dependent upon the decision-making of our directors and executive officers as well as the directors and executive officers of our businesses. The loss of any or all of our

directors and executive officers could delay the implementation of our strategies or divert our directors and executive officers’ attention from our operations which could have a material adverse effect on
our business, financial condition, results of operations or liquidity.

14

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Foreign exchange rate fluctuations and controls could have a material adverse effect on our earnings and the strength of our balance sheet.

Through our businesses, we have facilities and generate costs and revenues in a number of geographic regions across the globe. As a result, a significant portion of our revenue and certain of

our businesses’ operating expenses, assets and liabilities, are denominated in currencies other than the U.S. Dollar. The predominance of certain currencies varies from business to business, with many of
our businesses generating revenues or incurring indebtedness in more than one currency. For example, most of ZIM’s revenues and a significant portion of its expenses are denominated in the U.S.
Dollar. However, a material portion of ZIM’s expenses are denominated in local currencies.

As of the date of this annual report, we have outstanding back-to-back guarantees to Chery of up to RMB425 million, plus certain interest and fees, in respect of certain of Qoros’ indebtedness.

In addition, from time to time, we have held, and may hold, a portion of our available cash in RMB, which may expose us to RMB exchange rate fluctuations.

Furthermore, our businesses may pay distributions or make payments to us in currencies other than the U.S. Dollar, which we must convert to U.S. Dollars prior to making dividends or other

distributions to our shareholders if we decide to make any distributions in the future. Foreign exchange controls in countries in which our businesses operate may further limit our ability to repatriate
funds from unconsolidated foreign affiliates or otherwise convert local currencies into U.S. Dollars.

Consequently, as with any international business, our liquidity, earnings, expenses, asset book value, and/or amount of equity may be materially affected by short-term or long-term exchange

rate movements or controls. Such movements may give rise to one or more of the following risks, any of which could have a material adverse effect on our business, financial condition, results of
operations or liquidity:

·

·

·

·

Transaction Risk —exists where sales or purchases are denominated in overseas currencies and the exchange rate changes after our entry into a purchase or sale commitment but prior to
the completion of the underlying transaction itself;

Translation Risk —exists where the currency in which the results of a business are reported differs from the underlying currency in which the business’ operations are transacted;

Economic Risk —exists where the manufacturing cost base of a business is denominated in a currency different from the currency of the market into which the business’ products are sold;
and

Reinvestment Risk —exists where our ability to reinvest earnings from operations in one country to fund the capital needs of operations in other countries becomes limited.

If our businesses are unable to manage their interest rate risks effectively, our cash flows and operating results may suffer.

Certain of our businesses’ indebtedness bears interest at variable, floating rates. In particular, some of this indebtedness is in the form of Consumer Price Index (CPI)-linked, NIS-denominated
bonds. We, or our businesses, may incur further indebtedness in the future that also bears interest at a variable rate or at a rate that is linked to fluctuations in a currency in the form of other than the U.S.
Dollar. Although our businesses attempt to manage their interest rate risk, there can be no assurance that they will hedge such exposure effectively or at all in the future. Accordingly, increases in interest
rates or changes in the CPI that are greater than changes anticipated based upon historical trends could have a material adverse effect on our or any of our businesses’ business, financial condition, results
of operations or liquidity.

Risks Related to the Industries in Which Our Businesses Operate

Current conditions in the global economy, and in the industries in which our businesses operate in particular, could have a material adverse effect on us.

The business and operating results of each of our businesses have been, and will continue to be, affected by worldwide economic conditions, particularly conditions in the energy generation,

passenger vehicle, and shipping industries our businesses operate in. The operating results and profitability of our businesses may be adversely affected by slower global economic growth, credit market
crises, lower levels of consumer and business confidence, downward pressure on prices, high unemployment levels, reduced levels of capital expenditures, fluctuating commodity prices (particularly
prices for electricity, natural gas, heavy fuel oil, bunker, gasoline, and crude oil), bankruptcies, government deficit reduction and austerity measures, heightened volatility, uncertainties with respect to the
stability of the emerging markets, austerity measures by governments, increased trade protectionism and other challenges affecting the global economy. Volatility in global financial markets and in prices
for oil and other commodities could result in a continuation or worsening of these conditions. As a result of these conditions, some of the government and non-government customers of our businesses
have experienced, and may experience, deterioration of their businesses, cash flow shortages, and/or difficulty in obtaining financing. As a result, existing or potential customers may delay or cancel
plans to purchase the products and/or services of our businesses, including long-term purchases of energy capacity (in the case of IC Power) or purchases of shipping capacity (in the case of ZIM), or
may not be able to fulfill their obligations to us in a timely fashion. Furthermore, the vendors, suppliers and/or partners of each of our businesses may be experiencing similar conditions, which may
impact their ability to fulfill their obligations. In addition, volatility in global fuel prices can affect margins at IC Power. For further information, see “ —Risks Related to IC Power’s Generation Business
—The profitability of IPPs in Israel may be adversely affected by changes in Israel’s regulatory costs and EA tariffs. ”

15

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Additionally, economic downturns may alter the priorities of governments to subsidize and/or incentivize participation in any of the markets in which our businesses operate. For example,

economic downturns or political dynamics may impact the availability of financial incentives provided by the Chinese government for Chinese automobile purchases. Slower growth or deterioration in
the global economy (as a result of recent volatility in global markets and commodity prices, or otherwise) could have a material adverse effect on our business, financial condition, results of operations or
liquidity.

Our businesses’ operations expose us to risks associated with conditions in those markets.

Through our businesses, we operate and service customers in a number of geographic regions across the globe, including emerging markets. There are certain risks inherent in conducting

business in emerging markets, including:

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

heightened economic volatility;

difficulty in enforcing agreements, collecting receivables and protecting assets;

the possibility of encountering unfavorable circumstances from host country laws or regulations;

fluctuations in revenues, operating margins and/or other financial measures due to currency exchange rate fluctuations and restrictions on currency and earnings repatriation;

unfavorable changes in regulated electricity tariffs;

trade protection measures, import or export restrictions, licensing requirements and local fire and security codes and standards;

increased costs and risks of developing, staffing and simultaneously managing a number of foreign operations as a result of language and cultural differences;

issues related to occupational safety, work hazard, and adherence to local labor laws and regulations;

potentially adverse tax developments;

changes in the general political, social and/or economic conditions in the countries where we operate, particularly in emerging markets;

the threat of nationalization and expropriation;

the presence of corruption in certain countries;

fluctuations in available municipal funding in those instances where a project is government-financed;

terrorist activities; and

cyber-attacks.

If any of our businesses are impacted by any of the aforementioned factors, such an impact could have a material adverse effect on our business, financial condition, results of operations or

liquidity.

We require qualified personnel to manage and operate our various businesses.

As a result of our decentralized structure, we require qualified and competent management to independently direct the day-to-day business activities of each of our businesses, execute their

respective business plans, and service their respective customers, suppliers and other stakeholders, in each case across numerous geographic locations. Many of the products and services offered by our
businesses are highly technical in nature and may require specialized training or physically demanding work. Therefore, we must be able to retain employees and professionals with the skills necessary to
understand the continuously developing needs of our customers and to maximize the value of each of our businesses. This includes developing talent and leadership capabilities in the emerging markets
in which certain of our businesses operate, where the depth of skilled employees may be limited. Changes in demographics, training requirements and/or the unavailability of qualified personnel could
negatively impact the ability of each of our businesses to meet these demands. Unpredictable increases in the demand for our goods and/or services, or the geographical diversity of our businesses, may
exacerbate the risk of not having a sufficient number of trained personnel. If any of our businesses fail to train and retain qualified personnel, or if they experience excessive turnover, we may experience
declining sales, production/manufacturing delays or other inefficiencies, increased recruiting, training or relocation costs and other difficulties, any of which could have a material adverse effect on our
business, financial condition, results of operations or liquidity.

16

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Significant raw material shortages, supplier capacity constraints, production disruptions, supplier quality and sourcing issues or price increases could increase our operating costs and adversely impact
the competitive positions of the products and/or services of our businesses.

The reliance of certain of our businesses on certain third-party suppliers, contract manufacturers and service providers, or commodity markets to secure raw materials (e.g., natural gas, HFO,

and diesel for IC Power and bunker and containers for ZIM), parts, components and sub-systems used in their products or services exposes us to volatility in the prices and availability of these materials,
parts, components, systems and services. Some of these suppliers or their sub-suppliers are limited- or sole-source suppliers.

For example, Kallpa, the largest IC Power operating company, is party to a natural gas exclusive supply agreement with a consortium of suppliers, pursuant to which such consortium supplies

Kallpa with all of its natural gas requirements based upon a base price, in U.S. Dollars, set on the date of the agreement and indexed on two producer price indices pursuant to the terms of the agreement.
Additionally, Kallpa is party to a natural gas exclusive transportation agreement with a gas transporter. OPC-Rotem is party to a natural gas exclusive supply agreement with a consortium of suppliers
who, in accordance with a resolution passed by the Israeli Natural Gas Council, may be required to allocate gas otherwise designated for OPC-Rotem to other consumers in the event of a capacity
shortage. For further information on the terms and nature of IC Power’s relationships with certain of its raw material suppliers, see “—Risks Related to IC Power—Risks Related to IC Power’s
Generation Business—Supplier concentration may expose IC Power to significant financial credit or performance risk, particularly with respect to those agreements which may expire during the life of
its power plants ” and “ Item 4.B Business Overview — Our Businesses—IC Power—IC Power’s Description of Operations—IC Power’s Raw Materials and Suppliers .”

For further information on the terms and nature of Qoros’ relationships with certain of its raw material suppliers, see “ —Risks Related to Our Interest in Qoros—Qoros is dependent upon its

suppliers ” and “ Item 4.B Business Overview—Our Businesses—Qoros —Qoros’ Sourcing and Suppliers .”

A disruption in deliveries from these and other third-party suppliers, contract manufacturers or service providers, capacity constraints, production disruptions, price increases, or decreased

availability of raw materials or commodities, including as a result of catastrophic events, could have an adverse effect on the ability of our businesses to meet their commitments to customers or could
increase their operating costs. Our businesses could encounter supply problems and may be unable to replace a supplier that is not able to meet their demand in either the short- or the long-term; these
risks are exacerbated in the case of raw materials or component parts that are sourced from a single-source supplier. Furthermore, quality and sourcing issues experienced by third-party providers can
also adversely affect the quality and effectiveness of our businesses’ products and/or services and result in liability and reputational harm that could have a material adverse effect on our business,
financial condition, results of operations or liquidity.

Some of our businesses must keep pace with technological changes and develop new products and services to remain competitive.

The markets in which some of our businesses operate experience rapid and significant changes as a result of the introduction of both innovative technologies and services. To meet customer

needs in these areas, these businesses must continuously design new, and update existing, products and services, as well as invest in, and develop new technologies. Introducing new products and
technologies requires a significant commitment to research and development that, in return, requires the expenditure of considerable financial resources that may not always result in success.

Our sales and profitability may suffer if our businesses invest in technologies that do not operate, or may not be integrated, as expected or that are not accepted into the marketplace as

anticipated, or if their services, products or systems are not introduced to the market in a timely manner, in particular, compared to its competitors, or become obsolete. Furthermore, in some of these
markets, the need to develop and introduce new products rapidly in order to capture available opportunities may lead to quality problems. Our operating results depend to a significant extent on our
ability, and the ability of these businesses, to anticipate and adapt to changes in markets and to reduce the costs of producing high-quality, new and existing products and services. If we, or any of these
businesses, are unsuccessful in our efforts, such a failure could have a material adverse effect on our business, financial condition, results of operations or liquidity.

17

 
 
 
 
 
 
 
 
Our businesses may be adversely affected by work stoppages, union negotiations, labor disputes and other matters associated with our labor force.

As of December 31, 2016, we, and our consolidated businesses, employed, directly and indirectly, approximately 2,100 employees. Qoros and ZIM employed approximately 1,900 and 3,700

employees, respectively, as of December 31, 2016. Our businesses could experience strikes, industrial unrest, or work stoppages.

Disruptions in the operations of any of our businesses as a result of labor stoppages or strikes may also occur in the future and, if so, such disruptions could materially and adversely affect our or

the relevant businesses’ reputation and could adversely affect operations. Additionally, a work stoppage at any one of the suppliers of any of our businesses could materially and adversely affect our
operations if an alternative source of supply were not readily available. Stoppages by employees of our customers could also result in reduced demand for our products or services which could have a
material adverse effect on our business, financial condition, results of operations or liquidity.

The activities of certain of our businesses may be impacted by the geopolitical, economic and security conditions in Israel and the Middle East.

Some of our businesses are incorporated, and certain of the operations of our businesses are located, in Israel. Therefore, the existing security, economic and geopolitical conditions in Israel and

the Middle East could affect our existing relationships with certain foreign corporations, as well as affect the willingness of potential partners to enter into transactions or business relationships with
Israeli companies, particularly our businesses that are based in or have facilities which are located in Israel. For example, numerous countries, corporations and organizations limit their business activities
in Israel and their business ties with Israeli-based companies. For example, ZIM’s status as an Israeli company has limited, and may continue to limit, ZIM’s ability to call on certain ports and has
therefore impacted, and may continue to impact, ZIM’s ability to enter into alliances and operational partnerships with other shipping companies. Additionally, Israel has been and is subject to terrorist
activity, with varying levels of severity. Parties with whom we or our businesses do business have sometimes declined to travel to Israel during periods of heightened unrest or tension, forcing us to make
alternative arrangements where necessary. Developments in the political and security situation in Israel may also result in parties with whom we have agreements claiming that they are not obligated to
perform their commitments under those agreements pursuant to force majeure provisions. Although the number of businesses limiting their ties to Israel is decreasing, any deterioration in the security or
geopolitical conditions in Israel and/or the Middle East could adversely impact our business relationships and thereby have a material adverse effect on our business, financial condition, results of
operations or liquidity.

Israel’s geopolitical situation has led to security issues and, as a result, our Israel-based operations or associated companies, including ICPI, its subsidiaries OPC-Rotem and OPC-Hadera, and

ZIM may be exposed to hostile activities (including harm to computer systems or, with respect to IC Power’s operations or development projects, attacks on critical infrastructure, such as gas
transmission systems or pipelines), security restrictions connected with Israeli bodies/organizations overseas, possible isolations by various bodies for numerous political reasons, and other limitations
(such as a prohibition against entering into specific ports). Certain of OPC-Rotem’s, OPC-Hadera’s or ZIM’s employees in Israel are also subject to being called upon to perform military service in
Israel, and their absence may have an adverse effect upon the operations of the relevant business. Generally, unless exempt, male adult citizens of Israel under the age of 41 are obligated to perform up to
36 days of military reserve duty annually and are subject to being called to active duty at any time under emergency circumstances. Furthermore, while OPC-Rotem is classified as an “essential facility”
by the State of Israel, and therefore, certain of its key employees are exempt from military service in times of emergency, OPC-Rotem’s employees may be subject to being called upon to perform
military service should OPC-Rotem lose this classification. Additionally, ZIM’s owned and chartered vessels, including those vessels that do not sail under the Israeli flag, may be subject to control by
the authorities of the State of Israel in order to protect the security of or bring essential supplies and services to the State of Israel. Israeli legislation also allows the State of Israel to use ZIM’s vessels in
times of emergency.

Any of the aforementioned events and conditions could disrupt IC Power’s or ZIM’s operations, which could, in turn, have a material adverse effect on our business, financial condition, results

of operations or liquidity.

We, and each of our businesses, face cyber-security risks.

Our business operations, and the operations of our various operating companies, rely upon secure information technology systems for data processing, storage and reporting. As a result, we, and

our businesses, maintain information security policies and procedures for managing such information technology systems. However, such security measures may be ineffective and our information
technology systems, or those of our businesses, may be subject to cyber-attacks, including malicious software, network, system, application and data breaches and such cyber-security breaches may
result in operational disruptions or information misappropriation.

Furthermore, ZIM and IC Power’s subsidiaries OPC-Rotem and OPC-Hadera may be at greater risk for cyber-attacks due to their status as Israeli corporations, as a number of Israeli
corporations have been the subject of recent cybersecurity attacks. For example, in January 2016, Israel’s Electricity Authority, or the EA, was the subject of one of the largest cyber-attacks in Israeli
history and had to shut down several of its systems in order to address the cyber-attack. Should Kenon or any of its operating businesses experience a cyber-attack, this could have a material adverse
effect on our, or any of our operating companies’, business, financial condition or results of operation. For further information on the risks related to IC Power’s information technology systems, see “—
The interruption or failure of IC Power’s information technology, communication and processing systems or external attacks and invasions of these systems could have an adverse effect on IC Power .”

18

 
 
 
 
 
 
 
 
 
Risks Related to Legal, Regulatory and Compliance Matters

We, and each of our businesses, are subject to legal proceedings and legal compliance risks.

We are subject to a variety of legal proceedings and legal compliance risks in virtually every part of the world. We, our businesses, and the industries in which we operate, are periodically

reviewed or investigated by regulators and other governmental authorities, which could lead to enforcement actions, fines and penalties or the assertion of private litigation claims and damages. Changes
in laws or regulations could require us, or any of our businesses, to change manners of operation or to utilize resources to maintain compliance with such regulations, which could increase costs or
otherwise disrupt operations. Protectionist trade policies and changes in the political and regulatory environment in the markets in which we operate, such as foreign exchange import and export controls,
tariffs and other trade barriers and price or exchange controls, could affect our businesses in several national markets, impact our profitability and make the repatriation of profits difficult, and may
expose us or any of our businesses to penalties, sanctions and reputational damage. In addition, the uncertainty of the legal environment in some regions could limit our ability to enforce our rights.

The global and diverse nature of our operations means that legal and compliance risks will continue to exist and additional legal proceedings and other contingencies, the outcome of which
cannot be predicted with certainty, will arise from time to time. No assurances can be made that we will be found to be operating in compliance with, or be able to detect violations of, any existing or
future laws or regulations. A failure to comply with or properly anticipate applicable laws or regulations could have a material adverse effect on our business, financial condition, results of operations or
liquidity.

We could be adversely affected by violations of the U.S. Foreign Corrupt Practices Act and similar anti-bribery laws outside of the United States.

The U.S. Foreign Corrupt Practices Act, or the FCPA, and similar anti-bribery laws in other jurisdictions generally prohibit companies and their intermediaries from making improper payments
to government officials or other persons for the purpose of obtaining or retaining business. Recent years have seen a substantial increase in anti-bribery law enforcement activity, with more frequent and
aggressive investigations and enforcement proceedings by both the U.S. Department of Justice and the SEC, increased enforcement activity by non-U.S. regulators, and increases in criminal and civil
proceedings brought against companies and individuals. Our policies mandate compliance with the FCPA and other applicable anti-bribery laws. We operate, through our businesses, in many parts of the
world  that  are  recognized  as  having  governmental  and  commercial  corruption.  Additionally,  because  many  of  our  customers  and  end  users  are  involved  in  infrastructure  construction  and  energy
production, they are often subject to increased scrutiny by regulators. Our internal control policies and procedures may not protect us from reckless or criminal acts committed by our employees, the
employees of any of our businesses, or third party intermediaries. In the event that we believe or have reason to believe that our employees or agents have or may have violated applicable anti-corruption
laws, including the FCPA, we would investigate or have outside counsel investigate the relevant facts and circumstances, which can be expensive and require significant time and attention from senior
management. Violations of these laws may result in criminal or civil sanctions, inability to do business with existing or future business partners (either as a result of express prohibitions or to avoid the
appearance of impropriety), injunctions against future conduct, profit disgorgements, disqualifications from directly or indirectly engaging in certain types of businesses, the loss of business permits,
reputational harm or other restrictions which could disrupt our business and have a material adverse effect on our business, financial condition, results of operations or liquidity.

Our global operations necessitate the importation and exportation of goods and technology across international borders on a regular basis. From time to time, we, or our businesses, obtain or
receive information alleging improper activity in connection with such imports or exports. Our policy mandates strict compliance with applicable trade laws. Nonetheless, our policies and procedures
may not always protect us from actions that would violate U.S. and/or foreign laws. Such improper actions could subject us to civil or criminal penalties, including material monetary fines, denial of
import or export privileges, or other adverse actions. The occurrence of any of the aforementioned factors could have a material adverse effect on our business, financial condition, results of operations
or liquidity.

In addition, our subsidiary IC Power has made acquisitions in recent years, including the acquisition of Energuate, a Guatemalan electricity distribution company, in January 2016. We face risks

with respect to compliance with the FCPA and similar anti-bribery laws through our acquisition of new companies and the due diligence we perform in connection with an acquisition may not be
sufficient to enable us fully to assess an acquired company’s historic compliance with applicable regulations. Furthermore, our post-acquisition integration efforts may not be adequate to ensure our
system of internal controls and procedures are fully adopted and adhered to by acquired entities, resulting in increased risks of non-compliance with applicable anti-bribery laws.

19

 
 
 
 
 
 
 
 
Certain of our businesses are subject to regulatory restrictions relating to ties with hostile entities and/or countries.

As a result of their international activities and operations in various industries worldwide, certain of our businesses are exposed to regulations in Israel and in other countries governing business

relations with hostile entities or countries. We have taken, and will continue to take, measures to ensure our compliance with such regulations. Despite our best precautions, however, the wide-reaching
business activities of our businesses may expose us to sanctions, which could have a material adverse effect on our business, financial condition, results of operations or liquidity.

Risks Related to IC Power

IC Power’s results of operations and financial condition are dependent upon the economic, environmental, social and political conditions in those countries in which IC Power operates.

IC Power has operating assets in 11 countries, including emerging markets, as well as development projects in these or other countries. As a result, IC Power’s results of operations are

dependent upon the economic, social and political conditions in each of the countries in which it operates, and IC Power is exposed to a variety of risks, including risks related to:

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

heightened economic volatility;

difficulty in enforcing agreements, collecting receivables and protecting assets;

difficulty in obtaining authorizations, permits and licenses required for the operation of its assets;

the possibility of encountering unfavorable circumstances from host country laws or regulations;

fluctuations in revenues, operating margins and/or other financial measures due to currency exchange rate fluctuations and restrictions on currency and earnings repatriation;

trade protection measures, import or export restrictions, licensing requirements and environmental, local fire and security codes and standards;

increased costs and risks of developing, staffing and simultaneously managing a number of foreign operations as a result of language and cultural differences;

issues related to occupational safety, work hazard, and adherence to local labor laws and regulations;

potentially adverse tax developments or interpretations;

changes in political, social and/or economic conditions;

the threat of nationalization and expropriation;

the presence of corruption in certain countries;

fluctuations in the availability of funding;

a potential deterioration in IC Power’s relationships with the different stakeholders in the communities surrounding its facilities;

terrorist or other hostile activities; and

changes in the regulatory and environmental legal framework, including the costs of complying with environmental and energy regulations.

Additionally, IC Power’s revenue is derived primarily from the sale of electricity, and the demand for electricity is largely driven by the economic, political and regulatory conditions of the

countries in which IC Power operates. Therefore, IC Power’s results of operations and financial condition are, to a large extent, dependent upon the overall level of economic activity in these emerging
market countries. Should economic or political conditions deteriorate in Peru, or in any of the other countries in which IC Power operates, or in emerging markets generally, such an occurrence could
have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

20

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power primarily operates, and expects to continue to primarily operate, in emerging markets.

IC Power has operations in a number of emerging markets, including Peru, Guatemala, Chile and Colombia. Investing in the securities of a company with operations in emerging markets

generally involves a higher degree of risk than investing in the securities of a company with operations in a more developed market. For example, IC Power is subject to increased political, social and
economic instability, which may affect the economic results of the emerging markets in which it operates and which stems from many factors, including:

·

·

·

·

high interest rates;

abrupt changes in currency values;

high levels of inflation;

exchange controls;

· wage and price controls and increased employment-related regulations;

·

·

·

·

regulations on imports of equipment and other necessities (goods and services) relevant to operations;

changes in governmental, economic or tax policies;

social and political tensions, and

any of which could have a material adverse effect on its financial condition, results of operations or liquidity.

IC Power is a holding company and is dependent upon cash flows from its subsidiaries to meet its existing and future obligations.

IC Power is a holding company of various operating companies, and as a result, does not conduct independent operations or possess significant assets other than investments in its businesses.

Therefore, IC Power depends upon the receipt of sufficient funds from its businesses (via dividends or loans) to meet its obligations, including to contribute committed capital to its businesses, repay any
amounts it may borrow in the future, and to pay dividends or other distributions to IC Power’s shareholders. However, as IC Power’s corporate structure includes several intermediate holding companies
which, along with its operating subsidiaries and investees, are legally distinct from IC Power and will generally be required to service their debt obligations before making distributions to IC Power, IC
Power’s ability to access such cash flow from its subsidiaries and investees may be limited in some circumstances and it may not have the ability to cause entities in which it owns an interest to make
distributions to it, even if they are able to do so. Additionally, the terms of existing and future joint ventures, financings, or cooperative operational agreements, ratings considerations, and/or the laws
and jurisdictions under which each of IC Power’s subsidiaries and investees is incorporated may also limit the timing and amount of any dividends, other distributions, loans or loan repayments to IC
Power. In the case of ICP and Inkia, subsidiaries and investees with investments in numerous subsidiaries and investees, their ability to make payments to IC Power may be further limited if their
subsidiaries and investees are unable to make payments to them.

Additionally, as dividends are generally taxed and governed by the relevant authority in the jurisdiction in which the company is incorporated or where the company is a tax resident, there may

be numerous and significant tax or other legal restrictions on the ability of IC Power’s subsidiaries and investees to remit funds to it, or to remit such funds without IC Power’s, or its subsidiaries and
investees, incurring significant tax liabilities.

IC Power is significantly leveraged.

As of December 31, 2016, IC Power had $3.1 billion of outstanding indebtedness on a consolidated basis, respectively, excluding IC Power’s $145 million note payable to Kenon. Some of IC
Power’s debt agreements include financial covenants, affirmative and negative covenants, and/or events of default or mandatory prepayments for contractual breaches, change of control events, and/or
material mergers and divestments, among other provisions.

IC Power uses a substantial portion of its cash flow from operations or investing activities to make debt service payments, reducing IC Power’s ability to use cash flow to fund its operations,

capital expenditures or future business opportunities. Many of IC Power’s debt agreements provide for the repayment of the entire principal amount of the loan at final maturity, which repayments may
require IC Power to devote substantial portions of its cash flow for such payments. For further information on the final maturity and amortization of certain of IC Power’s debt agreements, see “ Item 5.B
Liquidity and Capital Resources—IC Power’s Liquidity and Capital Resources—IC Power’s Material Indebtedness .” In addition, a number of IC Power’s credit facilities are secured. The pledge of a
significant percentage of IC Power’s assets to secure its debt has reduced the amount of collateral that is available for future secured debt or credit support as well as its flexibility in dealing with these
secured assets. This level of indebtedness and related security, as well as the terms governing such indebtedness, could have other important consequences for IC Power, including:

·

increasing IC Power’s vulnerability to general adverse economic and industry conditions;

21

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

limiting IC Power’s flexibility in planning for, or reacting to, changes in its business and the industry;

limiting IC Power’s ability to enter into long-term power sales or fuel purchases which require credit support;

limiting IC Power’s ability to adjust to changing market conditions and placing IC Power at a competitive disadvantage compared to its competitors that are not as highly leveraged;

limiting IC Power’s ability to distribute dividends or other payments to its shareholders without leading to a downgrade of its outstanding indebtedness or long-term corporate ratings, if at
all; and

limiting, along with the financial and other restrictive covenants relating to such indebtedness, among other things, IC Power’s ability to borrow additional funds for working capital
including collateral postings, capital expenditures, acquisitions and general corporate or other purposes.

IC Power also provides performance, and other, guarantees, from time to time, in support of the financing and development of certain of its subsidiaries, including in connection with project

bids and tenders. As of December 31, 2016, IC Power had provided performance, or other, guarantees in an aggregate amount of $124 million.

IC Power may be unable to refinance its existing indebtedness or raise additional indebtedness on favorable terms, or at all.

IC Power may need to refinance all, or a portion of, its indebtedness on or before the respective maturity dates. For example, IC Power's $120 million ICPDH Credit Agreement and $100

million Overseas Facility mature in June 2017 and November 2017, respectively. IC Power’s ability to refinance its indebtedness, obtain additional financing or comply with its existing lenders’
requirements will depend on, among other things:

·

·

·

·

IC Power’s financial condition, or the financial condition of its relevant subsidiaries, at the time of the proposed refinancing;

the amount of financing outstanding and lender requirements outstanding at the time of the proposed refinancing;

restrictions in any of IC Power’s credit agreements, indentures, or other outstanding indebtedness; and

other factors, including the condition of the financial markets.

If IC Power does not have adequate access to credit, it may be unable to refinance its existing borrowings and credit facilities on commercially reasonable terms and may be forced to raise

financing at a higher cost or on less favorable terms (e.g., by providing collateral, security or guarantees to lenders and/or accepting higher interest rates) when its existing indebtedness matures.
Additionally, if IC Power is not able to refinance any of its indebtedness and does not generate sufficient cash flow from operations, and additional borrowings or refinancings or proceeds of asset sales
are not available to IC Power, it may not have sufficient cash to enable it to meet all of its obligations. Should future access to capital be unavailable to IC Power, it may have to sell assets or decide not
to build new plants or expand or improve existing facilities, any of which could affect IC Power’s future growth.

If IC Power is unable to manage its interest rate risks effectively, its cash flows and operating results may suffer.

As IC Power continues to draw down on its credit facilities with third parties and raise additional third party financing to fund its capital expenditures, it may experience an increase in interest

costs. Many of the debt agreements of IC Power’s operating companies have floating interest rates (e.g., many of the debt instruments are tied to London Interbank Offered Rate, or LIBOR) and a
continued increase in interest rates could increase the cost of the capital required to continue to fund IC Power’s development and expansion efforts. In particular, some of this indebtedness is in the form
of CPI-linked NIS-denominated bonds. IC Power, or its businesses, may incur further indebtedness in the future that also bears interest at a variable rate or at a rate that is linked to fluctuations in a
currency other than the U.S. Dollar. In addition, to the extent IC Power refinances any of its existing indebtedness, it may only be able to refinance such indebtedness at a less favorable interest rate.

Although IC Power’s businesses attempt to manage their interest rate risk by entering into interest rate swaps, there can be no assurance that they will hedge such exposure, in full, effectively or

at all in the future. Accordingly, increases in interest rates or changes in the CPI could have a material adverse effect on IC Power’s or any of its businesses’ business, financial condition, results of
operations or liquidity.

22

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power faces risks in connection with its expansion, development and acquisition strategy.

IC Power’s growth strategy contemplates (1) the expansion, construction or development of power generation facilities and (2) the acquisition, expansion and development of generation and

distribution companies in key growth markets. The ability to pursue such growth opportunities successfully will depend upon IC Power’s ability to identify projects and properties suitable for expansion,
construction or acquisitions, and negotiate purchase or engineering, procurement and construction agreements on commercially reasonable terms. Due to growing environmental restrictions, transmission
line saturation, obstacles for fuel transportation and a scarcity of sites in which new plants may be located, the development of new assets in the countries in which IC Power operates and in the countries
in which IC Power may operate in the future, are subject to increased developmental competition and involve higher development costs than in the past, which could have an adverse impact on its
strategy and business. In addition, IC Power applies a disciplined approach to evaluating potential development projects and is willing to lose competitive bids if the expected returns on a project do not
provide the appropriate risk-adjusted return, which may affect IC Power's ability to win bids and further impede IC Power's expansion strategy.

Additionally, IC Power relies significantly on its ability to successfully access the capital markets as a source of liquidity and such reliance may be increased to the extent that IC Power utilizes
cash from its operations to distribute funds to its shareholders or repay loans. IC Power’s ability to arrange financing with no or limited recourse to IC Power, and the costs of such capital, are dependent
upon numerous factors, some of which are beyond its control. Commercial lending institutions sometimes refuse to provide financing in certain less developed economies, and in these situations IC
Power may seek direct or indirect (through credit support or guarantees) project financing from a limited number of multilateral or bilateral international financial institutions or agencies. As a
precondition to making such project financing available, the lending institutions may also require sponsor guarantees for completion risks and governmental guarantees of certain business and sovereign
related risks. However, the financing from international financial agencies or governmental guarantees required to complete projects may not be available when needed. If so, IC Power may have to
abandon potential projects or invest more of its own funds, which may not be in line with its investment objectives and would leave less funds for other investments and projects.

An inability to identify and source appropriate projects and acquisitions, negotiate the agreements relating to such projects and acquisitions, or secure the necessary funding, could have an

adverse impact on IC Power’s strategy and, as a result, could have a material adverse effect on its business.

Acquisitions may not perform as expected.

In recent years, IC Power has completed several acquisitions and plans to continue to develop its portfolio through acquisitions in certain attractive markets, including those in which IC Power

does not currently operate. For example, in January 2016, IC Power completed its acquisition of its distribution business in Guatemala.

Acquisitions require IC Power to spend significant sums on legal, financial advisory and other expenses and consume a portion of its management’s focus. Acquisitions may increase IC

Power’s leverage or reduce its profitability. Future acquisitions may be large and complex, and IC Power may not be able to complete them successfully or, if completed, such acquisitions may not be
completed at the cost or in the time-frame in which they were initially expected.

Although acquired businesses may have significant operating histories at the time IC Power acquires them, IC Power will have no history of owning and operating these businesses and,

potentially, limited or no experience operating in these particular lines of business, or operating businesses in the countries in which these acquired businesses are located. For example, prior to IC
Power’s acquisition of Energuate, it had not previously operated or owned companies within the distribution sector. Future growth in revenues, earnings and cash flow will be partly dependent on its
ability to successfully operate within this industry.

With respect to any acquisitions of IC Power has made, or may consummate in the future:

·

·

·

·

acquired businesses may not perform as expected;

IC Power may incur unforeseen obligations or liabilities, which may entail significant expense;

the fuel supply needed to operate an acquired generation business at full capacity may not be available;

acquired businesses may not generate sufficient cash flow to support the indebtedness existing at acquisition, the indebtedness incurred to acquire them or the capital expenditures needed to
operate them;

23

 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

the rate of return from acquired businesses may be lower than anticipated in IC Power’s decision to invest its capital to acquire them;

any benefits gained may not outweigh the management and personnel resources which will need to be diverted from IC Power’s operations to achieve those benefits; and

IC Power may not be able to expand as planned, manage the acquired company’s activities and achieve the economies of scale and any expected efficiency or other gains IC Power had
planned, which often drive such acquisition decisions.

Certain of IC Power’s facilities are affected by climate conditions and changes in the climates or other occurrences of natural phenomena in the countries in which these facilities operate could have a
material adverse effect on IC Power.

Certain of IC Power’s generation facilities are based on hydroelectric power generation. As a result, their operating results are directly impacted by water sources which are, in turn, affected by

the amount of rainfall and snowmelt.

The occurrence of natural phenomena, such as El Niño and La Niña, two climactic phenomena that influence rainfall regularity in some of the Latin American countries in which IC Power

operates, may result in droughts which affect its results of operations. A prolonged drought in a country in which IC Power’s generation facilities rely on hydroelectric energy may reduce its ability to
operate its hydroelectric plants at full capacity. In addition, a prolonged drought may result in disputes with governments, regulators, local communities, farmers and other stakeholders over water use.
As a result of such disputes, IC Power may be forced to enter into agreements which restrict its ability to use water for hydroelectric generation.

Droughts and excessive rainfall also affect the operation of IC Power’s thermal plants, including those facilities which use natural gas or HFO as fuel, in the following manner:

· During periods of drought, thermal plants are used more frequently. Operating costs of thermal plants can be considerably higher than those of hydroelectric plants. IC Power’s operating

expenses may increase during these periods.

·

·

IC Power’s thermal plants require water for cooling and a drought not only reduces the availability of water, but also increases the concentration of chemicals, such as sulfates in the water.
The high concentration of chemicals in the water IC Power uses for cooling increases the risk of damaging the equipment at its thermal plants as well as the risk of violating relevant
environmental regulations. As a result, IC Power may have to purchase water from areas that are also experiencing shortages of water. These water purchases may increase IC Power’s
operating costs, as well as the costs relating to its social responsibility commitments.

Thermal power plants burning gas generate emissions such as sulfur dioxide (SO2) and nitrogen oxide (NOx) gases. When operating with diesel, they also release particulate matter into the
atmosphere. Therefore, greater use of thermal plants during periods of drought increases the risk of unsatisfactory performance of the abatement equipment used to control pollutant
emissions.

· During excessive rainfall periods, hydroelectric plants increase their generation, which reduces the spot prices in the system, and also reduces the dispatch of thermal power plants. As a
result, IC Power’s thermal plants selling energy to the spot market may face a reduction in their margins due to their lower dispatch or due to sales occurring at the lower spot prices.

Additionally, certain of IC Power’s facilities are also exposed to additional climate change risk and to the specific natural phenomena occurring in their respective countries of operation,
including earthquakes (due to heightened seismic activity), hurricanes and flooding, landslides, volcanic eruptions, fire, and other natural disasters. For example, in April 2017, Kanan experienced a fire,
and as a result of the fire, both its 55 MW and 37 MW barges were placed off-line. For further information on the incident, see “ Item 5. Operating and Financial Review and Prospects—Recent
Developments—IC Power—Fire at Kanan Plant .”

Furthermore, the production of wind energy depends heavily on suitable wind conditions, which are variable and difficult to predict. Operating results for such plants vary significantly from

period to period depending on the wind resource during the periods in question. For example, IC Power’s Amayo I and Amayo II wind farms generated less energy in 2016 than 2015 due to lower wind
levels. Therefore, the electricity generated by IC Power’s wind energy plants may not meet its anticipated production levels or the rated capacity of the turbines located there, which could adversely
affect its business.

IC Power could experience severe business disruptions, significant decreases in revenues based on lower demand arising from climate changes or catastrophic events, or significant additional

costs to IC Power not otherwise covered by business interruption insurance policies. There may be an important time lag between a major climate change event, accident or catastrophic event and IC
Power’s recovery from any insurance policies, which typically carry non-recoverable deductible amounts, and in any event, are subject to caps per event. Furthermore, many of IC Power’s supply
agreements, including its natural gas supply agreements and transportation services agreements, contain force majeure provisions that allow for the suspension of performance by its counterparties for
the duration of certain force majeure events. If a force majeure event were to occur and IC Power’s counterparties were to temporarily suspend performance under their contracts, IC Power may be
forced to find alternative suppliers in the market on short notice (which IC Power may be unable to do) and incur additional costs. Additionally, any of these events could cause adverse effects on the
energy demand of some of IC Power’s customers and of consumers generally in the affected market, the occurrence of which could have a material adverse effect on its business, financial condition,
results of operations or liquidity.

24

 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power is exposed to electricity spot market, fuel and other commodity price volatility.

IC Power’s generation companies purchase and sell electricity in the wholesale spot markets. During the years ended December 31, 2016, 2015 and 2014, IC Power’s generation companies

purchased 16%, 17% and 18% of the electricity that they sold (in GWh) from the spot market, respectively. As a result, IC Power is exposed to spot market prices, which tend to fluctuate substantially.
In addition, to the extent that any of IC Power's PPAs expire, but are not renewed or replaced, IC Power's generation companies may be required to make a significant percentage of their sales on the spot
market.

Unlike most other commodities, electric power can only be stored on a very limited basis and generally must be produced concurrently with its use. As a result, power prices are subject to

significant volatility from supply and demand imbalances, especially within the spot markets in which IC Power may purchase and sell electricity. Typically, spot market prices for electricity are volatile
and the demand for such electricity often reflects the cyclical fluctuating cost of coal, natural gas and oil, rain volumes or the conditions of hydro reservoirs. The Peruvian and Chilean electricity markets
are also indirectly affected by the price of copper, as a result of the electricity-intensive mining industry, which represents a significant source of the electricity demand in these markets. Therefore, a
decline in such mining activity could adversely affect IC Power, and any changes in the supply and cost of coal, natural gas and oil, rain volumes, the conditions of hydro reservoirs, the unexpected
unavailability of other generating units, or the supply and cost of copper, may impact the volume of electricity demanded by the market. Volatility in market prices for fuel and electricity may result from
many factors which are beyond its control and IC Power does not generally engage in hedging transactions to minimize such risks. For further information on the effects of fluctuations in oil prices on IC
Power’s results of operations, see “ Item 5. Operating and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Fluctuations in Oil Prices and Currency
Exchange Rates. ”

Some of the countries in which IC Power operates, or may operate in the future, have experienced terrorist activity and social unrest in the past and it is possible that a resurgence of terrorism in any of
these countries could occur in the future.

Some of the countries in which IC Power operates, or may operate in the future, have experienced terrorist activity and social unrest in the past. For example, Peru, the country in which IC
Power has its largest operations, experienced terrorist activity that reached its peak of violence against the government and private sector in the late 1980s and early 1990s. In addition, Energuate has
experienced violent protests and other hostile activity within its service area from organizations in Guatemala. Any terrorist activities or other hostile actions in Peru, Guatemala or other countries in
which IC Power operates could have a material adverse effect on IC Power’s business, financial condition and results of operation.

The existing security, economic and geopolitical conditions in Israel and the Middle East could affect IC Power’s operations in Israel. Israel has been and is subject to terrorist activity, with
varying levels of severity. Parties with whom IC Power does business have sometimes declined to travel to Israel during periods of heightened unrest or tension, forcing IC Power to make alternative
arrangements where necessary. Developments in the political and security situation in Israel may also result in parties with whom IC Power has agreements claiming that they are not obligated to
perform their commitments under those agreements pursuant to force majeure provisions. Any deterioration in the security or geopolitical conditions in Israel and/or the Middle East could adversely
impact IC Power’s business relationships and thereby have a material adverse effect on its business, financial condition, results of operations or liquidity.

Israel’s geopolitical situation has led to security issues and, as a result, IC Power’s Israel-based subsidiary OPC-Rotem, as well as any additional entities IC Power may develop or acquire in

Israel, including OPC-Hadera, may be exposed to hostile activities (including harm to computer systems or, with respect to its operations, missile attacks on its facilities or attacks on critical
infrastructure, such as gas transmission systems or pipelines), security restrictions connected with Israeli bodies/organizations overseas, possible isolations by various bodies for numerous political
reasons, and other limitations. Any of the aforementioned events and conditions could disrupt IC Power’s and OPC-Rotem’s operations, which could, in turn, have a material adverse effect on its
business, financial condition, results of operations or liquidity. Additionally, should OPC-Rotem lose its classification as an “essential facility” by the State of Israel, which classification exempts OPC-
Rotem’s key employees from military service in times of emergency, OPC-Rotem’s employees may be subject to being called upon to perform military service in Israel.

Inflation in any of the countries in which IC Power currently operates, or will, operate could adversely affect IC Power.

If any of the countries in which IC Power currently operates, or in which IC Power may operate in the future, experiences substantial inflation, the costs of its operations could increase and its
operating margins could decrease, which could materially and adversely affect its results of operations. A number of the countries in which IC Power operates have experienced significant inflation in
prior years. Inflationary pressures may also impact IC Power’s margins to the extent that cost increases driven by inflation are not accompanied by corresponding increases in the price of electricity or
capacity sold, or limit its ability to trigger the minimum thresholds set forth in the price adjustment mechanisms in IC Power’s PPAs or long-term supply agreements or access foreign financial markets,
and may also prompt government intervention in the economy of the affected country, including the introduction of government policies that may adversely affect the overall performance of such
economy. Any of the foregoing could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

25

 
 
 
 
 
 
 
 
 
IC Power has granted rights to the minority shareholders of certain of its subsidiaries.

Although IC Power owns a majority of the voting equity in most of its businesses, IC Power has entered into, and may, and in some instances, will be required to, continue to enter into,
shareholders’ agreements granting minority rights to the minority shareholders of certain of those entities. For example, IC Power has entered into shareholders’ agreements with, among others, Energía
del Pacífico S.A., or Energía del Pacífico, a member of the Quimpac group and the minority shareholder of Kallpa, CDA and Samay I, as well as with Veolia Energy Israel Ltd., or Veolia, the minority
shareholder of OPC-Rotem, and Centrans Energy Services Inc., the minority shareholder of IC Power’s Nicaraguan assets. Among other things, IC Power’s shareholders’ agreements generally grant the
applicable minority shareholder veto rights over significant acquisitions and dispositions as well as the incurrence of significant debt. Therefore, IC Power’s ability to develop and operate any of its
businesses governed by a shareholders’ agreement may be limited if IC Power is unable to obtain the approval of a minority shareholder for certain corporate actions IC Power deems to be in the best
interest of the relevant business. In addition, such shareholders’ agreements may limit IC Power’s ability to dispose of its interests in any of these businesses. IC Power’s operation of its subsidiaries may
also subject IC Power to litigation proceedings initiated by the minority shareholders of its subsidiaries.

IC Power could face risks, or barriers to exit, in connection with the disposals or transfers of its businesses or their assets.

IC Power continually assesses the strategic composition of its power generation portfolio and may, as a result of its assessments, divest its interests in businesses whose operations are

inconsistent with its long-term strategic plan. Divestitures can generate organizational and operational efficiencies, cash for use in IC Power’s capital investment program and operations, and cash to
repay outstanding debt. However, divestitures may also result in a decline in IC Power’s net income or profitability.

Additionally, IC Power may face exit barriers, including high exit costs or objections from various stakeholders, in connection with dispositions of certain of its operating companies or their
assets. For example, pursuant to Israel’s Electricity Sector Law 5756-1996, or Electricity Sector Law, the transfer of control over an entity that holds a generation license in Israel must be approved by
the Electricity Authority, or the EA. Additionally, pursuant to OPC-Rotem’s PPA with IEC and OPC-Rotem’s syndicated credit agreement, both IEC and OPC-Rotem’s lenders must consent to IC
Power’s transfer of control of OPC-Rotem to a third-party. Such restrictions, as well as similar restrictions contained in other shareholders’ agreements or financing agreements in respect of IC Power’s
other operating companies may prohibit IC Power from disposing of its interests in its businesses, and such prohibitions may have a material adverse effect on its development and growth strategy.
Furthermore, IC Power may face opposition from local governments in connection with any decision to sell and/or export any of the power generation barges that IC Power has installed or may install
from one country to another country.

IC Power requires qualified personnel to manage and operate its various businesses and projects.

As a result of IC Power’s decentralized structure, IC Power requires qualified and competent management to independently direct the day-to-day business activities of each of its businesses,

execute their respective business and/or project development plans, and service their respective customers, suppliers and other stakeholders, in each case across numerous geographic locations. The
services offered by IC Power’s businesses are highly technical in nature and require specialized training and/or physically demanding work. Therefore, IC Power must be able to retain employees and
professionals with the skills necessary to understand the continuously developing needs of IC Power’s customers, to maximize the value of each of its businesses, and to ensure the timely and successful
completion of any expansion or development projects. This includes developing talent and leadership capabilities in the emerging markets in which certain of IC Power’s businesses operate, where the
depth of skilled employees may be limited. Changes in demographics, training requirements and/or the unavailability of qualified personnel could negatively impact the ability of each of IC Power’s
businesses to meet these demands. Unpredictable increases in the demand for its services, or the geographical diversity of its businesses, may exacerbate the risk of not having a sufficient number of
trained personnel.

In addition, IC Power’s operating companies could experience strikes, industrial unrest or work stoppages. A significant percentage of IC Power’s employees in Guatemala, Bolivia, Israel and

Jamaica are members of unions, and, as of December 31, 2016, approximately 31% of all of its employees were unionized. For further information on IC Power’s unionized employees, see “ Item 4.B
Business Overview—Our Businesses—IC Power—Employees .”

If any of IC Power’s businesses fail to train and retain qualified personnel, or if they experience excessive turnover, strikes or work stoppages, IC Power may experience declining production,
maintenance delays or other inefficiencies, increased recruiting, training or relocation costs and other difficulties, any of which could have a material adverse effect on its business, financial condition,
results of operations or liquidity.

26

 
 
 
 
 
 
 
 
IC Power’s success will also be dependent upon the decision-making of its directors and executive officers as well as the directors and executive officers of its businesses. The loss of any or all

of IC Power’s directors and executive officers could affect the creation or implementation of its short-term plans or long-term strategies or divert its directors and executive officers’ attention from its
operations, which could result in a delay in the completion of a project, affect its ability to enter into PPAs, or otherwise have a material adverse effect on its business, financial condition, results of
operations or liquidity.

The interruption or failure of IC Power’s information technology, communication and processing systems or external attacks and invasions of these systems could have an adverse effect on IC Power.

IC Power depends on information technology, communication and processing systems to operate its businesses. Such systems are vital to each of IC Power’s operating companies’ ability to

monitor their power plants’ operations, maintain generation and network performance, adequately generate invoices to customers, achieve operating efficiencies and meet service targets and standards.
Damage to its networks and backup mechanisms may result in service delays or interruptions and limit IC Power’s ability to provide customers with reliable service over its networks. Some of the risks
to IC Power’s networks and infrastructure include:

• 

• 

• 

• 

• 

• 

• 

  physical damage to access lines, including theft, vandalism, terrorism or other similar events;

  energy surges or outages;

  software defects;

  scarcity of network capacity and equipment;

  disruptions beyond IC Power’s control;

  breaches of security, including cyber-attacks and other external attacks; and

  natural disasters.

The occurrence of any such event could cause interruptions in service or reduce IC Power’s generation capacity, either of which could reduce its revenues or cause IC Power to incur additional

expenses.

Furthermore, OPC-Rotem and OPC-Hadera may be at greater risk for cyber-attacks due to their status as Israeli corporations, as a number of Israeli corporations have been the subject of recent
cybersecurity attacks. For example, in January 2016, the EA was the subject of one of the largest cyber-attacks in Israeli history and had to shut down several of its systems in order to address the cyber-
attack. Should the EA, IEC, OPC-Rotem or OPC-Hadera experience a cyber-attack, this could have a material adverse effect on IC Power’s business, financial condition or results of operations.

Although IC Power has operational insurance with business interruption coverage that may protect it against specific insured events, IC Power may not be insured for all events or for the full

amount of the lost margin or additional expense. In addition, the occurrence of any such event may subject IC Power to penalties and other sanctions imposed by the applicable regulatory authorities. The
occurrence of damages to IC Power’s networks and systems could have a material adverse effect on its business, financial condition, results of operations or liquidity.

IC Power is exposed to material litigation and/or administrative proceedings.

IC Power is involved in various litigation proceedings, and may be subject to future litigation proceedings, any of which could result in unfavorable decisions or financial penalties against IC

Power, and IC Power will continue to be subject to future litigation proceedings, which could have material adverse consequences to its business.

For example, in July 2016, the Guatemalan Tax Administrator ( Superintendencia de Administración Tributaria ), or the SAT, issued a claim against DEORSA and DEOCSA for back taxes for

the years 2011 and 2012, alleging that these companies improperly deducted interest and amortization of goodwill relating to the acquisition of these companies in 2011 by their prior owner. DEORSA
and DEOCSA paid $43 million for alleged back taxes, interest and fines for 2011 and 2012 in 2016. In light of the SAT’s actions, and in order to avoid the initiation of complaints by the SAT concerning
tax for the years 2013, 2014 and 2015 and any resulting fines and interest, upon instruction of the SAT, DEORSA and DEOCSA revised their tax returns for these years and paid $32 million in August
2016, respectively, corresponding to alleged back taxes and interest for those years. The total payments described above (covering 2011 through 2015) are in the amount of $74 million, representing the
total amount demanded by the SAT, as well as DEORSA and DEOCSA’s payments to the SAT with respect to the 2013, 2014 and 2015 tax years as described above. In addition, during 2016, DEORSA
and DEOCSA made $5 million of advance income tax payments for taxes relating to 2016.

27

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DEORSA and DEOCSA are disputing the SAT’s claims and have made all payments subject to a broad reservation of rights, including but not limited to seeking restitution of such payments.

However, DEORSA and DEOCSA may be unsuccessful in their attempts to seek restitution for these payments. In addition, IC Power has recognized these payments as a non-current tax asset in its
financial statements (recorded on its balance sheet as an income tax receivable). Furthermore, although DEORSA and DEOCSA are pursuing legal remedies through the Guatemalan legal system to
determine their ability to deduct interest and amortization relating to the 2011 acquisition, DEORSA and DEOCSA may not be able to deduct such historical amounts or take similar deductions in the
future. In light of the court orders referred to above, at this time, DEORSA and DEOCSA are not currently deducting interest and amortization relating to the 2011 acquisition for income tax purposes.
However, income tax payments made in relation to such items are being recorded as non-current tax receivables. In addition, the management of IC Power and Energuate have expended, and will
continue to expend, expenses and time to pursue the remedies in connection with these claims. For further information on these claims, see “ Item 4.B Business Overview—Our Businesses—IC Power—
Legal Proceedings—Energuate Tax Claims .”

Furthermore, since 2010, the Peruvian Tax Authority ( Superintendencia Nacional de Administración Tributaria ), known as SUNAT for its abbreviation in Spanish, has issued tax assessments
to Kallpa and its lenders (as lessors under the Kallpa leases) for payment of import taxes allegedly owed by Kallpa and its lenders in connection with the engineering services of the EPC contractors for
Kallpa I, II, III and IV. As of December 31, 2016, the total tax exposure related to claims by SUNAT against Kallpa and its lenders in connection with the importation of equipment related to the Kallpa
projects, equaled S/79 million (approximately $24 million), including interest and fines. For further information on these proceedings, see “ Item 4.B Business Overview—Our Businesses —IC Power—
Legal Proceedings—Kallpa—Import Tax Assessments .”

In addition, in connection with the indexation of their natural gas price formula for OPC-Rotem’s gas supply agreement with the Tamar Group, OPC-Rotem and the Tamar Group disagreed as

to which of the PUAE’s July 2013 tariffs applied to OPC-Rotem’s supply agreement and have a similar disagreement with respect to the tariffs published in January 2015. In February 2017, OPC-Rotem
received a letter from the Tamar Group with respect to the dispute. The Tamar Group requested payment by OPC-Rotem of approximately $25 million (including accrued interest) in connection with the
dispute, and has requested that such amount be deposited in escrow pursuant to the gas supply agreement. OPC-Rotem and the Tamar Group remain in discussions with respect to this disagreement, and,
to the extent that this leads to an arbitration, OPC-Rotem will be required to deposit funds into an escrow account during the pendency of the arbitration. For further information on this claim, see “ Item
4.B Business Overview—Our Businesses—IC Power—Legal Proceedings—Dispute with Tamar Group .”

Litigation and/or regulatory proceedings are inherently unpredictable, and excessive verdicts do occur. Adverse outcomes in lawsuits and investigations could result in significant monetary

damages, including indemnification payments, or injunctive relief that could adversely affect IC Power’s ability to conduct its business and may have a material adverse effect on IC Power’s financial
condition and results of operations. In addition, such investigations, claims and lawsuits could involve significant expense and diversion of IC Power’s management’s attention and resources from other
matters, each of which could also have a material adverse effect on its business, financial condition, results of operations or liquidity.

IC Power’s insurance policies may not fully cover damage, and IC Power may not be able to obtain insurance against certain risks.

IC Power maintains insurance policies intended to mitigate its losses due to customary risks. These policies cover IC Power’s assets against loss for physical damage, loss of revenue and also
third-party liability. However, IC Power cannot assure you that the scope of damages suffered in the event of a natural disaster or catastrophic event would not exceed the policy limits of its insurance
coverage. In addition, IC Power may be required to pay insurance deductibles, which are not recoverable, in order to utilize IC Power’s insurance policies. IC Power maintains all-risk physical damage
coverage for losses resulting from, but not limited to, fire, explosions, floods, windstorms, strikes, riots, mechanical breakdowns and business interruption. IC Power’s level of insurance may not be
sufficient to fully cover all losses that may arise in the course of its business or insurance covering its various risks may not continue to be available in the future. In addition, IC Power may not be able to
obtain insurance on comparable terms in the future. IC Power may be materially and adversely affected if IC Power incurs losses that are not fully covered by its insurance policies and such losses could
have a material adverse effect on its business, financial condition, results of operations or liquidity. For example, in July 2016, all four of Samay I’s units were declared unavailable to the system due to
damage to the shafts in the three of the plant’s four units. By February 2017, all four of the units had been declared available to the system. The cost of the repairs was paid by the EPC contractor. To the
extent IC Power is required to incur costs relating to the outage, including repair costs and loss of profits, IC Power intends to seek coverage from the EPC contractor and/or the insurance coverage
(subject to deductibles). However, IC Power’s insurance coverage may not be sufficient to cover all of IC Power’s losses. For further information, see “ Item 4.B Business Overview—Our Businesses—
IC Power—IC Power’s Description of Operations—Generation Operations—Peru Segment—Samay I .” In addition, IC Power’s insurance may not cover the full costs associated with the fire at the
Kanan plant, which took place in April 2017. For further information, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—IC Power—Fire at Kanan Plant .” For
further information on IC Power’s insurance policies, see “ Item 4.B Business Overview—Our Businesses—IC Power—Insurance .”

28

 
 
 
 
 
 
Future expansion into new markets or businesses involves significant costs and risks, and may be unsuccessful.

IC Power is constantly monitoring and assessing development and acquisition opportunities. In particular, IC Power may seek to diversify and expand its operations to certain countries in which

IC Power does not currently have an operating presence, such as Argentina and Mexico, through greenfield development projects and acquisitions. Additionally, in January 2016, IC Power expanded its
portfolio by entering into the electricity distribution business through acquisition of Energuate (comprised of two electricity distribution companies in Guatemala (DEORSA and DEOCSA)).

Prior to IC Power’s acquisition of Energuate, IC Power had not operated a distribution business, and IC Power does not have any experience operating in certain of the other countries in which

it is considering expansion. In entering into new markets and operating in new businesses, IC Power could face managerial, commercial, technological and regulatory risks. The business strategies,
managerial expertise and institutional knowledge that IC Power utilizes and has developed over time with regard to power generation in the countries in which it currently operates may not be applicable
to the distribution business, or to the energy sectors of the countries in which IC Power is considering expansion.

As expansion into a new market or business will require significant investment of capital and management resources, such expansions will involve many risks, including risks related to:

• 

• 

• 

• 

• 

• 

  obtaining the necessary government and regulatory licenses and authorizations to operate;

  the significant capital expenditures required to establish a footprint in these businesses and markets;

  competition from experienced market participants;

  an inability to attract customers, create brand awareness and establish brand credibility;

  an inability to establish relationships with regulators, stakeholders and other market participants; and

  barriers to entry.

Furthermore, the acquisition of Energuate may not improve, and may even adversely affect, IC Power’s results of operations, and may expose IC Power to additional risks, liabilities and losses.

Additionally, operating the recently acquired Energuate business will initially involve significant costs and absorb management time and resources and may otherwise distract management from other
opportunities or problems in IC Power’s primary business of power generation and its primary markets, such as Peru and Israel. Similarly, if IC Power acquires companies or assets in new markets, IC
Power cannot provide assurance that such expansion efforts will be successful, or that it will be able to successfully execute its business plan. If IC Power is unsuccessful in the attempt to expand into
new businesses or markets, this could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

Governments have a high degree of influence in the countries in which IC Power operates.

IC Power operates in 11 countries and therefore is subject to significant and diverse government regulation. The laws and regulations affecting IC Power’s operations are complex, dynamic and

subject to new interpretations or changes. Such regulations affect almost every aspect of IC Power’s businesses, have broad application and, to a certain extent, limit management’s ability to
independently make and implement decisions regarding numerous operational matters. Additionally, governments in many of the markets in which IC Power operates frequently intervene in the
economy and occasionally make significant changes in monetary, credit, industry and other policies and regulations. Government actions to control inflation and other policies and regulations have often
involved, among other measures, price controls, currency devaluations, capital controls and limits on imports. IC Power has no control over, and cannot predict, what measures or policies governments
may enact in the future. The results of operations and financial condition of IC Power’s businesses may be adversely affected by changes in governmental policy or regulations in the jurisdictions in
which IC Power operates if those changes impact, among other things:

• 

• 

•

• 

  consumption of electricity and natural gas;

  supply of electricity and natural gas;

operation and maintenance of generation, transmission or distribution facilities, including the receipt of provisional and/or permanent operational licenses;

  tariffs or royalties on the use of water for hydroelectric or thermal plants;

29

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
• 

• 

• 

• 

• 

• 

• 

•

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

•

  energy policy;

  rules governing the dispatch merit order;

  key permits or operating licenses that IC Power currently holds;

  calculations of marginal costs or spot prices;

  subsidies and incentives;

  regulated rates and tariffs, including under PPAs where tariffs are based on regulated rates;

  labor or other laws;

the regulatory and environmental legal framework, including the costs of complying with environmental and energy regulations;

  mandatory salary increases;

  public consultations for new projects;

  social responsibility obligations;

  economic growth;

  currency fluctuations and inflation;

  fiscal policy and interest rates;

  capital control policies and liquidity of domestic capital and lending markets;

  tax laws, including the effect of tax laws on distributions from IC Power’s subsidiaries;

  import/export restrictions;

  acquisitions, construction, or dispositions of power assets; and

other political, social and economic developments in or affecting the countries in which its operating companies are based.

Uncertainty over whether governments will implement changes in policy or regulations affecting these or other factors in the future may also contribute to economic uncertainty and heightened

volatility in the securities markets or local economies including, for example, increasing volatility in local exchange rates.

Existing or future legislation and regulation or future audits could require material expenditures by IC Power or otherwise have a material adverse effect on its operations. For example, Peruvian

regulators have increased their reviews of permitting, licensing and concession applications and have recently imposed time limits on newly-granted licenses and concessions. Additionally, a regulation
that provides that non-regulated customers shall be granted access to the spot market was published in July 2016. This regulation establishes that large non-regulated customers can access the spot
market to cover up to 10% of their maximum demand registered in the last 12 months. However, this statute is not yet enforceable, as the complementary regulatory rules required for its implementation
have not yet been approved. Therefore, it remains uncertain as to how such access will be implemented and the impact such access may have on power companies in Peru, including IC Power’s Peruvian
assets. Such access could result in increased competition in the Peruvian generation sector and/or result in increased pressures to reduce contractual prices in Peru. Furthermore, the recent presidential
and congressional elections in Peru may impact the development of certain industries, affect the interpretation of existing legislation, or result in the enactment of additional regulations, actions or
agencies, which may result in changes in regulations in Peru that adversely affect IC Power’s business. Peruvian regulators may also enact processes to expand generation capacity in Peru in excess of
the rate of demand growth, which expansion could therefore have a negative impact on spot and contractual prices in Peru, which in turn could reduce the margins of IC Power’s Peruvian assets.
Moreover, Peruvian regulators may amend the rules that govern how natural gas prices in Peru are determined and such prices are used to determine the variable fuel cost of thermal generation units that
burn such fuel. As a result, any such amendment may affect the order of dispatch of thermal generation units in the Peruvian system (such as Kallpa or Samay I), which may have a material adverse
effect on IC Power’s margins or results of operations.

30

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Additionally, government agencies could take enforcement actions against IC Power and impose sanctions or penalties on it for failure to comply with applicable regulations. Depending on the
severity of the infraction, enforcement actions could include the closure or suspension of operations, the imposition of fines or other remedial measures, and the revocation of licenses. Compliance with
enhanced regulations could force IC Power to make capital expenditures and divert funds away from planned investments in a manner that could have a material adverse effect on its business, financial
condition, results of operations or liquidity.

Due to populist political trends that have become more prevalent in certain of the countries in which IC Power operates over recent years, some of the governments or authorities in countries

where IC Power operates might seek to promote efforts to increase government involvement in regulating economic activity, including the energy sector, which could result in the introduction of
additional political factors in economic decisions. For example, Bolivia has nationalized natural gas and petroleum assets, as well as generation companies that compete with IC Power. Bolivia has also
dictated mandatory salary increases for both public and private companies, affecting the profitability of IC Power’s company in Bolivia, COBEE. For further information on the risks related to the
Bolivian government’s recent nationalization of certain generation companies, see “— The Bolivian government has nationalized energy industry assets, and IC Power’s remaining operations in Bolivia
may also be nationalized .”

If IC Power fails to comply with existing regulations and legislation, or reinterpretations of existing regulations and new legislation or regulations, such as those relating to the reduction of anti-

competitive conduct, air and water quality, ecological waterflow for hydroelectric plants, noise avoidance, electromagnetic radiation, fuel and other storage facilities, volatile materials, renewable
portfolio standards, cybersecurity, emissions or air quality social responsibility, obligations or public consultations, performance standards, climate change, hazardous and solid waste transportation and
disposal, protected species and other environmental matters, or changes in the nature of the energy regulatory process, this may have a significant adverse impact on IC Power’s financial results.

IC Power is also subject to regulatory risks as a result of acquisition of Energuate in January 2016. For further information on the regulatory risks related to Energuate, see “— Risks Related to

IC Power’s Distribution Business—Energuate is subject to comprehensive regulation of its business, which may affect IC Power’s financial performance .”

IC Power’s equipment, facilities, operations and new projects are subject to numerous environmental, health and safety laws and regulations.

IC Power is subject to a broad range of environmental, health and safety laws and regulations which require IC Power to incur ongoing costs and capital expenditures and expose IC Power to

substantial liabilities in the event of non-compliance. These laws and regulations require IC Power to, among other things, minimize risks to the natural and social environment while maintaining the
quality, safety and efficiency of IC Power’s facilities. Furthermore, as IC Power’s operations are subject to various operational hazards, including personal injury and the loss of life, IC Power is subject
to laws and regulations that provide for the health and safety of its employees.

These laws and regulations also require IC Power to obtain and maintain environmental permits, licenses and approvals for the construction of new facilities or the installation and operation of

new equipment required for its business. Some of these permits, licenses and approvals are subject to periodic renewal. Government environmental agencies could take enforcement actions against IC
Power for any failure to comply with applicable laws and regulations. Such enforcement actions could include, among other things, the imposition of fines, revocation of licenses, suspension of
operations or imposition of criminal liability for non-compliance. Environmental laws and regulations can also impose strict liability for the environmental remediation of spills and discharges of
hazardous materials and wastes and require IC Power to indemnify or reimburse third parties for environmental damages. As fuel leaks may occur when fuel is received from containerships at sea (as is
the case for fuel received in El Salvador and the Dominican Republic), sea water may be inadvertently polluted at the time of fuel receipt; IC Power’s primary operational environmental risk relates to
the potential leaking of such fuel. Although IC Power has operating procedures in place to minimize these, and other, environmental risks, there is no assurance that such procedures will prove successful
in avoiding inadvertent spills or discharges.

IC Power expects the enforcement of environmental, health and safety rules to become more stringent over time, making its ability to comply with the applicable requirements and obtain

permits and licenses in a timely fashion more difficult. Additionally, compliance with changed or new environmental, health and safety regulations could require IC Power to make significant capital
investments in additional pollution controls or process modifications. These expenditures may not be recoverable and may consequently divert funds away from planned investments in a manner that
could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

The nature of IC Power’s operations means that legal and compliance risks will continue to exist and additional legal proceedings and other contingencies, the outcome of which cannot be

predicted with certainty, will arise from time to time. No assurances can be made that IC Power will be found to be operating in compliance with, or be able to detect violations of, any existing or future
laws or regulations. A failure to comply with or properly anticipate applicable laws or regulations could have a material adverse effect on IC Power’s business, financial condition, results of operations or
liquidity.

31

 
 
 
 
 
 
 
 
 
In the case of new project developments, environmental or other regulations may change during the course of IC Power’s development of such projects, potentially increasing the costs of such

projects or making them inviable projects for completion.

Foreign exchange rate fluctuations and controls could have a material adverse effect on IC Power’s earnings and financial position.

Through IC Power’s businesses, IC Power has facilities and generates costs and revenues in a number of countries in Latin America, the Caribbean and Israel. Although IC Power’s costs and

revenues are generally denominated in the U.S. Dollar, or are linked to the U.S. Dollar as a result of its PPAs or supply agreements, OPC-Rotem’s revenues, operating expenses, assets and liabilities are
denominated in New Israeli Shekels. Therefore, significant fluctuations in the New Israeli Shekel against the U.S. Dollar could have a material adverse effect on IC Power’s margins, earnings and the
strength of its balance sheet. In IC Power’s other countries of operation, which generally have a direct or indirect link to the U.S. Dollar, the effects of the indexation may materialize on a delayed basis
or may require a minimum threshold to be triggered; inflationary pressures, which impact exchange rate fluctuations, may also impact its margins to the extent that cost increases driven by inflation are
not accompanied by corresponding increases in the price of electricity or capacity sold. In addition, some costs, such as payroll and taxes, are normally denominated in local currency, and this
denomination exposes IC Power to the foreign exchange fluctuations of the relevant local currency vis-a-vis the U.S. Dollar. Furthermore, Energuate operates primarily in Guatemalan Quetzales.
Therefore, significant fluctuations in the Guatemalan Quetzal against the U.S. Dollar could have a material adverse effect on IC Power’s earnings and financial condition.

Additionally, IC Power’s businesses may pay distributions or make payments to IC Power in currencies other than the U.S. Dollar. Foreign exchange controls in countries in which IC Power’s

businesses operate may further limit its ability to repatriate funds or otherwise convert local currencies into U.S. Dollars. Although exchange rates within Peru, for example, are determined by market
conditions, with regular purchase and sale operations by the Peruvian Central Reserve Bank ( Banco Central de Reserva del Perú ) in the foreign exchange market in order to reduce volatility in the
value of Peru’s currency against the U.S. Dollar, this has not always been the case. Should the relevant regulatory bodies in any of the countries in which IC Power operates institute protectionist and
interventionist laws and policies or restrictive exchange rate policies in the future, such policies could have a material adverse effect on its operating companies or its financial condition, results of
operations or liquidity.

Consequently, as with any international business, IC Power’s liquidity, earnings, expenses, asset book value, and/or amount of equity may be materially affected by short-term or long-term

exchange rate movements or controls. Such movements may give rise to, among other risks, translation risk, which exists where the currency in which the results of a business are reported differs from
the underlying currency in which the business’ operations are transacted, which could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity. For
further information on the effect of the exchange rates on IC Power’s results of operations see “ Item 5. Operating and Financial Review and Prospects—Material Factors Affecting Results of Operations
—IC Power—Fluctuations in Oil Prices and Currency Exchange Rates .”

IC Power’s growth may be limited by antitrust laws.

IC Power has acquired a number of operating power generation companies. In the future, IC Power may seek to expand its operations within any of the countries in which IC Power currently, or

may in the future, operates. Government policies, specifically antitrust and competition laws in these relevant countries, can impact its ability to execute this strategy successfully.

In Peru, for example, the National Institute for the Defense of Competition and Intellectual Property Protection ( Instituto Nacional de Defensa de la Competencia y de la Protección de la
Propiedad Intelectual ), or INDECOPI, the Peruvian antitrust regulator, reviews acquisition agreements that may result in vertical or horizontal market concentration in the electricity sector and, in
connection with such review, may impose conditions upon the parties to such agreements, according to relevant legislation.

Similarly, in Israel, the Antitrust Authority is authorized to prevent market power accumulation through the regulation of mergers in Israel. Additionally, IC Power’s expansion activities in
Israel may be limited by the Law for Promotion of Competition and Reduction of Concentration—2013, or the Concentration Law. Pursuant to such law, if IC Power, or a company controlled by it,
intends to obtain or purchase a license for the production of electricity in the future for a power plant which exceeds 175 MW, such obtainment or purchase will be subject to the procedures set forth in
the Concentration Law. In addition to the above limitation, under the Concentration Law, the EA (which in January 2016 replaced the PUAE) has the authority (following consultation with the Antitrust
Authority) to determine competition guidelines and rules regarding the allocation of licenses for the production of electricity. Accordingly, in March 2015, the PUAE published its guidelines, which
stipulate that: (1) the maximum capacity of electricity production facilities, using conventional and cogeneration technologies, held or controlled by one person, is capped at MW 1,600, and (2) a person
may not hold or control a dominant market share in any particular production technology (e.g., conventional or cogeneration). According to the guidelines, holdings of 40% of the total installed capacity
of any particular technology in Israel shall be deemed to raise anti-trust concerns. Entities deemed to be under common control with IC Power would be considered to have capacity of a single person.
Therefore, the capacity of entities which may be considered to be under common control with IC Power may prevent IC Power from effecting certain acquisitions or otherwise increasing its operations in
Israel.

32

 
 
 
 
 
 
 
 
 
IC Power could be adversely affected by violations of the U.S. Foreign Corrupt Practices Act and similar anti-bribery laws outside of the United States.

The U.S. Foreign Corrupt Practices Act, or the FCPA, and similar anti-bribery laws in other jurisdictions generally prohibit companies and their intermediaries from making improper payments
to government officials or other persons for the purpose of obtaining or retaining business. Recent years have seen a substantial increase in anti-bribery law enforcement activity, with more frequent and
aggressive investigations and enforcement proceedings by both the Department of Justice and the SEC, increased enforcement activity by non-U.S. regulators, and increases in criminal and civil
proceedings brought against companies and individuals. IC Power’s policies mandate compliance with these anti-bribery laws. IC Power operates, through its businesses, in countries that are recognized
as having governmental and commercial corruption. Additionally, because many of IC Power’s customers and end users are involved in infrastructure construction and energy production, they are often
subject to increased scrutiny by regulators. IC Power cannot assure you that its internal control policies and procedures will protect IC Power from reckless or criminal acts committed by IC Power’s
employees, the employees of any of IC Power’s businesses, or third party intermediaries. In the event that IC Power believes or have reason to believe that IC Power’s employees or agents have or may
have violated applicable anti-corruption laws, including the FCPA, IC Power may be required to investigate or have outside counsel investigate the relevant facts and circumstances, which can be
expensive and require significant time and attention from senior management. Violations of these laws may result in criminal or civil sanctions, inability to do business with existing or future business
partners (either as a result of express prohibitions or to avoid the appearance of impropriety), injunctions against future conduct, profit disgorgements, disqualifications from directly or indirectly
engaging in certain types of businesses, the loss of business permits or other restrictions which could disrupt IC Power’s business and have a material adverse effect on IC Power’s business, financial
condition, results of operations or liquidity.

In addition, IC Power has made acquisitions in recent years, including the acquisition of Energuate, a Guatemalan electricity distribution company, in January 2016. IC Power faces risks with
respect to compliance with the FCPA and similar anti-bribery laws through its acquisition of new companies and the due diligence it performs in connection with an acquisition may not be sufficient to
enable it fully to assess an acquired company’s historic compliance with applicable regulations. Furthermore, IC Power’s post-acquisition integration efforts may not be adequate to ensure our system of
internal controls and procedures are fully adopted and adhered to by acquired entities, resulting in increased risks of non-compliance with applicable anti-bribery laws.

Risks Related to IC Power’s Generation Business

Construction or development projects may not be completed or, if completed, may not be completed on time or perform as expected.

IC Power plans to expand its operations through projects constructed on unused land, or greenfield projects. Greenfield projects require IC Power to spend significant sums on engineering,
permitting, legal, financial advisory and other expenses in preparation for competitive bids that IC Power may not win or before IC Power determines whether a development project is even feasible,
economically attractive or capable of being financed. These activities consume a portion of IC Power’s management’s focus and could increase IC Power’s leverage or reduce its consolidated
profitability.

Furthermore, once IC Power decides to proceed with a project and, if applicable, enter into a turnkey agreement to commence the construction of a project, its development and construction still

involve numerous additional risks, including:

·

·

·

·

·

·

·

·

unanticipated cost overruns;

claims from contractors;

an inability to obtain financing at affordable rates or at all;

delays in obtaining necessary permits and licenses, including environmental permits;

design, engineering, equipment manufacturing, environmental and geological problems and defects;

adverse changes in the political and regulatory environment in the country in which the project is located;

opposition by political, environmental and other local groups;

shortages or increases in the price of equipment, materials or labor;

· work stoppages or other labor disputes;

·

adverse weather conditions, natural disasters, accidents or other unforeseen events; and

33

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

an inability to perform under PPAs as a result of any delays in the plants becoming operational or material defects to the plants after reaching COD.

Any of these risks could result in IC Power’s financial returns on its projects being lower than expected, or could cause IC Power to operate below expected capacity or availability levels. This,
in turn, could result in IC Power’s experiencing lost revenues and/or increased expenses. Although IC Power maintains insurance to protect against some of these risks, its insurance coverage may not be
sufficient and may not cover some of the costs incurred or profits lost as a result of these risks. As a result, projects may cost more than anticipated and IC Power may be unable to fund principal and
interest payments underlying its construction financing obligations, if any. In addition, a default under such a financing obligation could result in IC Power losing its interest in a power generation
facility.

IC Power’s generation companies may not be able to enter into, or renew existing, long-term contracts for the sale of energy and capacity, contracts which reduce volatility in IC Power’s results of
operations.

IC Power’s generation companies sell a substantial majority of their energy under long-term PPAs. Most of IC Power’s generation companies rely upon PPAs with a limited number of
customers for the majority of their energy sales and revenues over the term of such PPAs, which typically range from one to 15 years. Some of IC Power’s generation companies’ long-term PPAs are at
prices above current spot market prices. Depending on market conditions and regulatory regimes, it may be difficult for IC Power’s generation companies to secure long-term PPAs with new customers,
renew existing long-term PPAs as they expire, or enter into long-term PPAs to support the development of new projects. Furthermore, in the case of IC Power’s generation companies with power plants
which are less competitive in the relevant dispatch order (such as older power plants), it may be difficult for these generation companies to enter into long-term PPAs or renew expiring PPAs. As a result,
IC Power’s generation companies have been, and may continue to be, required to sell capacity and energy on the spot market at the rates dictated by such market. For example, following the expiration
of CEPP’s PPA in September 2014, and certain of Puerto Quetzal’s PPAs in 2015, a significant percentage of CEPP and Puerto Quetzal's respective energy sales have been made on the spot market.

In addition, when the distribution companies in El Salvador organize tenders under the supervision of the General Superintendency of Electricity and Telecommunications ( Superintendencia
General de Electricidad y Telecomunicaciones ), or SIGET, for new long-term PPAs, the bidding rules generally do not permit the participation of HFO-fired generators, such as Nejapa, in tenders for
PPAs with terms in excess of five years. An increase in the availability of, and demand for, renewable energy in the other countries in which IC Power’s generation companies operate could lead to
similar prohibitions in those countries and a further reduction in their ability to enter into long-term PPAs.

Furthermore, the introduction of a more efficient energy generation technology could adversely affect the competitiveness of IC Power’s gas-fired energy plants in the dispatch order, which

affects their ability to enter into long-term PPAs. Similarly, IC Power’s other generation assets face potential displacements in dispatch merit orders as new, more efficient technologies became available
in their markets. Any displacement of dispatch merit orders could affect the competitiveness of IC Power’s generation assets and thereby impact their ability to enter into long-term PPAs. If IC Power’s
generation companies are unable to enter into long-term PPAs, they may be required to sell electricity into spot markets at prices that may be below the prices established in their PPAs, including in
those countries which are, or may be, experiencing an oversupply in capacity in the short- to medium-term. Because of the volatile nature of power prices, if IC Power’s generation companies are unable
to secure long-term PPAs, they could face increased volatility in their earnings and cash flows and could experience substantial losses during certain periods which could have a material adverse effect
on IC Power’s business, financial condition, results of operations or liquidity.

IC Power’s generation businesses are exposed to counterparty risks.

IC Power’s cash flows and results of operations are dependent upon the continued ability of its generation customers to meet their obligations under their relevant PPAs. Additionally, a small

number of customers purchase a significant portion of IC Power’s output under PPAs that account for a substantial percentage of the anticipated revenue of its generation companies. Although IC
Power’s generation companies evaluate the creditworthiness of their various counterparties, its generation companies may not always be able to, if at all, fully anticipate, detect, or protect against
deterioration in a counterparty’s creditworthiness and overall financial condition. The deterioration of creditworthiness or overall financial condition of a material counterparty (or counterparties) could
expose IC Power to an increased risk of non-payment or other default under its contracts with them.

Furthermore, if any of the counterparties to IC Power’s PPAs were to become insolvent, IC Power may be unable to recover payment under local insolvency laws. For example, under Peruvian

insolvency laws, if a private counterparty under any of IC Power’s PPAs were to become insolvent, its claims with respect to payments due by such counterparty under its relevant contract will rank
junior to, among others, the counterparty’s labor, social security, taxes, pension fund and secured obligations. In such a case, IC Power’s ability to recover payments due on its existing PPAs in Peru may
be limited. Any default by any of IC Power’s key customers could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

34

 
 
 
 
 
 
 
 
 
IC Power operates in highly competitive markets.

The worldwide markets for power generation are highly competitive in terms of pricing, quality, development and introduction time, customer service and financing terms. In many of the

markets in which IC Power operates, it faces downward price pressure and it is or could be exposed to market downturns or slower growth, which may increase in times of declining investment
activities, government incentives and/or consumer demand. IC Power faces strong competitors, some of which are larger and may have greater resources in a given business area than it has, as well as
competitors from emerging markets, which may have better, more efficient cost structures.

For example, in May 2016, Samay I (IC Power’s cold-reserve thermoelectric plant) reached its COD on schedule, providing an additional 632 MW of installed capacity to the Peruvian market.

In August 2016, IC Power provided an additional 545 MW of installed capacity to the Peruvian market with the completion of the construction of CDA’s plant. As a result of the completion of various
plants in Peru in recent years (including Samay I and CDA), the generation capacity in Peru increased at a faster rate than the demand for such electricity, resulting in a temporary oversupply of capacity
in the Peruvian market and therefore a corresponding downward pressure on energy and capacity prices. IC Power expects this trend in energy prices to continue in the next few years. For the next few
years, IC Power will face the current soft energy price market for any upcoming new PPA negotiations, renegotiations under existing PPAs and spot market sales. For further information on the Peruvian
power industry, see “ Item 5.D Trend Information—Peru Power Market .”

Additionally, in recent years, the power production industry has been characterized by strong and increasing competition with respect to obtaining long-term and short-term PPAs—which

provide for the sale of electricity, independent of actual generation allocations or provisions of availability, to financially stable distribution companies or other non-regulated consumers—and acquiring
existing power generation assets. In certain markets, these factors have caused reductions in the prices negotiated in PPAs and, in many cases, have caused higher acquisition prices for existing assets
through competitive bidding processes. The evolution of competitive electricity markets and the continued development of highly efficient gas-fired power plants have also caused, or are anticipated to
cause, price pressure in certain power markets where IC Power sells or intends to sell power. Certain competitors might be more effective and faster in capturing available market opportunities, which in
turn may negatively impact IC Power’s market share.

Any of these factors alone, or in combination, may negatively impact one or more of IC Power’s businesses and thereby have a material adverse effect on its business, financial condition,

results of operations or liquidity.

IC Power’s generation businesses rely on power transmission facilities that it does not own or control and that are subject to transmission constraints. If these facilities fail to provide IC Power with
adequate transmission capacity, IC Power may be restricted in its ability to deliver wholesale electric power and IC Power may either incur additional costs or forego revenues.

IC Power’s generation businesses depend upon transmission facilities owned and operated by others to deliver the wholesale power it sells from its power generation plants. If transmission is

disrupted, or if the transmission capacity infrastructure is inadequate, IC Power’s ability to sell and deliver wholesale power may be adversely impacted. If the power transmission infrastructure in one or
more of the markets that IC Power serves is inadequate, its recovery of wholesale costs and profits may be limited. If restrictive transmission price regulation is imposed, the transmission companies may
not have sufficient incentive to invest in expansion of transmission infrastructure. IC Power cannot predict whether transmission facilities will be expanded in specific markets to accommodate
competitive access to those markets, a failure of which could have a material adverse effect on its business, financial condition, results of operations or liquidity. In addition, in some of the markets in
which IC Power operates, different spot prices may occur within the grid as a result of a transmission constraint. As a result, IC Power may need to purchase energy in the spot market in order to fulfill a
PPA obligation in one part of the grid, even if IC Power is generating energy in another part of the grid, and such purchase may occur at a spot market price which is higher than its own generation cost.

If any of IC Power’s generation units are unable to generate energy as a result of a breakdown or other failure, IC Power may be required to purchase energy on the spot market to meet its contractual
obligations under the relevant PPAs.

The breakdown or failure of one of IC Power’s generation facilities may require IC Power to purchase energy in the spot market to meet its contractual obligations under its PPAs, while

simultaneously resulting in an increase in the spot market price of energy, resulting in a contraction, or loss, of its margins. In addition, the failure or breakdown of one of IC Power’s generation units
may prevent that particular facility from performing under applicable PPAs which, in certain situations, could result in termination of the PPA or liability for liquidated damages, the occurrence of which
could have a material adverse effect on its business, financial condition, results of operations or liquidity.

IC Power maintains insurance policies for property value and business interruptions, intended to mitigate any losses due to customary risks. However, we cannot assure you that the scope of

damages suffered in such an event would not exceed the policy limits, deductibles, losses, or loss of profits outlined in IC Power’s insurance coverage. IC Power may be materially and adversely affected
if it incurs losses that are not fully covered by its insurance policies and such losses could have a material adverse effect on its business, financial condition, results of operations or liquidity. For further
information on the risks related to IC Power’s insurance policies, see “— IC Power’s insurance policies may not fully cover damage, and IC Power may not be able to obtain insurance against certain
risks .”

35

 
 
 
 
 
 
 
 
 
 
The profitability of IPPs in Israel may be adversely affected by changes in Israel’s regulatory costs and EA tariffs.

The EA, which replaced Israel’s Public Utilities Authority (Electricity), or the PUAE, on January 1, 2016, regulates and supervises, among other things, the provision of essential electric public
services in Israel and OPC-Rotem’s operations can be affected by changes in the EA’s policies, regulations, and tariffs. The EA’s generation component tariff, for example, serves as the base price for IC
Power’s Israeli generation businesses’ calculation of the sale price of its energy to its private customers. As a result, its increases or decreases have a related effect on the sales price of OPC-Rotem’s
energy and OPC-Rotem’s revenues. In addition, the price at which OPC-Rotem purchases its natural gas from its sole natural gas supplier, the Tamar Group, a group composed of Noble Energy
Mediterranean Ltd., Delek Drilling Limited Partnership, Isramco Negev 2 Limited Partnership, Avner Oil Exploration Limited Partnership and Dor Gas Exploration Limited Partnership, is
predominantly indexed (in excess of 70%) to changes in the EA’s generation component tariff, pursuant to the price formula set forth in OPC-Rotem’s supply agreement with the Tamar Group. As a
result, increases or decreases in this tariff have a related effect on OPC-Rotem’s cost of sales and margins.

In July 2013, the PUAE published four generation component tariffs/power cost indicators, ranging from NIS 386 per MWh to NIS 333.2 per MWh, instead of the single tariff that had

previously been used. In January 2015, the PUAE published new tariffs, which reduced the tariff rates by approximately 10%.

Additionally, on September 8, 2015, the PUAE published a final decision, which became effective on September 13, 2015, reducing the PUAE generation component tariff by approximately

12% from NIS 300.9 per MWh and NIS 301.5 per MWh to a single tariff of NIS 265.2 per MWh. In December 2016, the EA published its generation component tariff update, which became effective on
January 1, 2017, and further reduced the generation component tariff by approximately 0.5% from NIS 265.2 per MWh to NIS 264 per MWh. The natural gas price formula in OPC-Rotem’s supply
agreement is subject to a floor mechanism and, as a result of previous declines in the PUAE generation component tariff, OPC-Rotem began to pay the ultimate floor price in November 2015. Therefore,
the September 2015 decline, the January 2017 decline and any further declines in the EA generation component tariff will not result in a corresponding decline in OPC-Rotem’s natural gas expenses, and
may lead to a greater decline in OPC-Rotem’s margins, which may have a material adverse effect on OPC-Rotem’s business, results of operations and financial condition. The next annual update of the
generation component tariff is expected to be conducted in December 2017.

Furthermore, since 2013, the PUAE had been in the process of determining a system cost tariff. In August 2015, the PUAE published a decision that IPPs in Israel would be obligated to pay

system management service charges, which charges are retroactively effective as of June 1, 2013. According to the PUAE decision, as amended in September 2015, the amount of system management
service charges that would be payable by OPC-Rotem from the effective date of June 1, 2013 to June 30, 2015, was approximately NIS 159 million (approximately $41 million), excluding interest rate
and linkage costs, based upon the “average rate” of the system management service charges. However, as the rate of the new system management service charges, like other rates of the EA, varies by
season (e.g., summer and winter) and by demand period (peak, shoulder and off-peak), IEC’s final calculation of the amount payable by OPC-Rotem was based upon the applicable time of use rates,
which provides different energy rates for different seasons (e.g., summer and winter) and different periods of time during the day, or “Time of Use” rates. In December 2015, OPC-Rotem received an
invoice from IEC (in its capacity as the system manager) regarding the NIS 163 million (approximately $43 million) amount of system management service charges that would be payable by OPC-
Rotem for such period, including interest rate and linkage costs. In February 2016, OPC-Rotem paid NIS 154 million (approximately $41 million) to IEC in satisfaction of this amount (excluding the
interest rate, and linkage costs).

For further information on Israel’s seasonality and the related EA tariffs, see “ Item 4.B Business Overview—Our Businesses—IC Power—Industry Overview—Overview of Electricity
Generation Industry—Israel. ” For further information on the effect of EA tariffs on IC Power’s revenues and margins, see “ Item 5. Operating and Financial Review and Prospects—Material Factors
Affecting Results of Operations—IC Power—EA Tariffs Affect IC Power’s Results in its Generation Business’ Israel Segment. ”

In connection with the indexation of their natural gas price formula for OPC-Rotem’s gas supply agreement with the Tamar Group, OPC-Rotem and the Tamar Group disagreed as to which of
the PUAE’s July 2013 tariffs applied to OPC-Rotem’s supply agreement and have a similar disagreement with respect to the tariffs published in January 2015. In February 2017, OPC-Rotem received a
letter from the Tamar Group with respect to the dispute. The Tamar Group requested payment by OPC-Rotem of approximately $25 million (including accrued interest) in connection with the dispute,
and has requested that such amount be deposited in escrow pursuant to the gas supply agreement. OPC-Rotem and the Tamar Group remain in discussions with respect to this disagreement, and, to the
extent that this leads to an arbitration, OPC-Rotem will be required to deposit funds into an escrow account during the pendency of the arbitration. For further on this claim, see “ Item 4.B Business
Overview—Our Businesses—IC Power—Legal Proceedings—Dispute with Tamar Group .”

36

 
 
 
 
 
 
 
Additionally, a steering committee was appointed by the State of Israel in July 2013 to propose a comprehensive reform of IEC. Although the steering committee had not published its final

recommendations, and there had not been any formal announcements concerning the steering committee’s discussions or negotiations with IEC and the State of Israel for some time, in November 2015
the steering committee announced that it had resumed its discussions regarding comprehensive reform of IEC and the Israeli electricity market. If OPC-Rotem incurs significant costs or experiences a
further reduction in revenues or margins as a result of changes in regulation or the establishment of any new regimes or the implementation of any such laws or governmental regulations, this could have
a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity. For further information on the regulation of the Israeli electricity sector, see “ Item 4.B Business
Overview—Our Businesses—IC Power—Regulatory, Environmental and Compliance Matters—Regulation of the Israeli Electricity Sector—EA. ”

Supplier concentration may expose IC Power to significant financial credit or performance risk, particularly with respect to those agreements which may expire during the life of its power plants.

IC Power relies on natural gas and HFO to fuel most of its power generation facilities. The delivery of these fuels to IC Power’s various generation facilities is dependent upon a number of

factors, including the continuing financial viability of contractual counterparties and the infrastructure (including barge facilities, roadways and natural gas pipelines) available to serve each generation
facility. Any disruption in the fuel delivery infrastructure or failure of a counterparty to perform, may lead to delays, disruptions or curtailments in the production of power at one or more of IC Power’s
generation facilities. This risk of disruption is compounded by the supplier concentration that characterizes many of IC Power’s operating companies.

IC Power sources most of its HFO from a limited number of suppliers. In the event of shipping delays which may affect IC Power’s suppliers, IC Power may experience delays in the receipt and

transportation of its HFO. Additionally, many of its gas suppliers are sole or monopolistic suppliers, and may exercise monopolistic control over their supply of natural gas to IC Power. The Kallpa and
Las Flores plants’ generation facilities, for example, rely on a consortium, composed of Pluspetrol Peru Corporation S.A., Pluspetrol Camisea S.A., Hunt Oil Company of Peru L.L.C. Sucursal del Perú,
SK Corporation Sucursal Peruana, Sonatrach Peru Corporation S.A.C., Tecpetrol del Perú S.A.C. and Repsol Exploración Perú Sucursal del Perú, which IC Power collectively refers to as the Camisea
Consortium, for the provision of natural gas and on a sole supplier for the transportation of such natural gas. If these suppliers cannot perform under their contracts, the Kallpa and Las Flores plants
would be unable to generate electricity at their facilities, and such a failure could prevent Kallpa and Las Flores from fulfilling their contractual obligations, which could have a material adverse effect on
IC Power’s business and financial results. Continued supply of natural gas to the Kallpa and Las Flores plants is dependent upon a number of factors, over which IC Power has no control, including:

·

·

·

levels of exploration, drilling, reserves and production of natural gas in the Camisea fields and other areas in Peru and the price of such natural gas;

accessibility of the Camisea fields and other gas production areas in Peru, which may be affected by weather, natural disasters, geographic and geological conditions, environmental
restrictions and regulations, activities of terrorist group or other impediments to access;

the availability, price and quality of natural gas from alternative sources;

· market conditions for the renewal of such agreements before their expiration and IC Power’s ability to renew such agreements and the terms of any renewal; and

·

the regulatory environment in Peru.

Upon the commencement of Samay I’s second operational stage, the Samay I plant will operate as a natural gas-fired power plant, and will be dependent on the provision of natural gas to it by

the Camisea Consortium and will also depend upon gas transportation services rendered by Concesionaria Gasoducto Sur Peruano S.A. through its natural gas pipeline, which is currently under
construction.

Furthermore, as the Camisea Consortium is the principal supplier of natural gas and natural gas transportation services to substantially all generation facilities in Peru fueled by natural gas, a
change in the terms of their agreements with IC Power or other power generators, or a failure by either of these suppliers to meet their contractual obligations, could have a significant effect on Peru’s
entire electricity supply and, therefore, prompt the Peruvian governmental authorities to undertake certain remedial actions. Any such actions could adversely affect the operations of the Kallpa or Las
Flores plants, or the expected operations of the Samay I plant’s second operational stage.

Similarly, OPC-Rotem has a gas supply agreement with a single supplier, which provides for the curtailment of OPC-Rotem’s gas supply in the event of a lack of pipeline capacity. Although

OPC-Rotem has never experienced a significant decline in its gas supply as a result of a lack of pipeline capacity, there can be no assurance that such declines will not occur. OPC-Rotem also relies on a
single transporter for the transport of its natural gas requirements. If such parties are unable to perform under their contracts with OPC-Rotem, or are forced to curtail, in whole or in part, their supply or
transport of natural gas to OPC-Rotem, OPC-Rotem would not be able to generate electricity using natural gas, which could adversely affect OPC-Rotem’s operations and financial performance. In
2016, the Tamar Group notified OPC-Rotem that as of September 30, 2020, OPC-Rotem’s gas supply will be available on a firm, non-interruptible basis.

37

 
 
 
 
 
 
 
 
 
 
 
 
Moreover, certain of IC Power’s contracts for natural gas are scheduled to expire during the life of the power plants which they service. These contracts have not yet been extended or replaced
with one or more contracts on comparable terms. For example, Kallpa, IC Power’s largest asset, purchases its natural gas requirements for its generation facilities from the Camisea Consortium pursuant
to a natural gas supply agreement which expires in June 2022 and which has not yet been extended. If IC Power is unable to renew, or enter into supply contracts and, in particular, enter into long-term
supply contracts, IC Power may be required to purchase its natural gas on spot markets at prices that may be significantly greater than the prices IC Power previously paid for such commodities, or may
be unable to purchase such commodities on competitive prices at all. As a result, IC Power could face increased volatility in its earnings and cash flows and could experience substantial losses during
certain periods which could have a material adverse effect on its business, financial condition, results of operations or liquidity.

The Bolivian government has nationalized energy industry assets, and IC Power’s remaining operations in Bolivia may also be nationalized.

Bolivia has experienced political and economic instability that has resulted in significant changes in its general economic policies and regulations and the adoption of a new constitution in 2006

that, among other things, prohibits private ownership of certain oil and gas resources. In May 2010, the Bolivian government nationalized Empresa Eléctrica Guaracachi S.A., or Guaracachi, Empresa
Eléctrica Valle Hermoso S.A., or Valle Hermoso and Empresa Eléctrica Corani S.A., or Corani, each a significant generation company in Bolivia. In May 2012, the Bolivian government nationalized
Transportadora de Electricidad S.A., a transmission company that had previously operated as a subsidiary of Red Eléctrica de España. In December 2012, Electricidad de La Paz S.A. (Electropaz) and
Empresa de Luz y Fuerza de Oruro S.A. (Elfeo)—companies which had no previous ownership relationship with the Bolivian government—were also nationalized.

It is unclear whether the Bolivian government will continue nationalizing entities involved in its power utility market. It is also unclear whether such nationalization (if any) would be

adequately compensated for by the Bolivian government. IC Power’s subsidiary COBEE is one of the few remaining privately-held generation companies in Bolivia. Although IC Power believes its
circumstances differ from those of the nationalized generation companies (because COBEE was not previously owned by the Bolivian government), there is a risk that COBEE will be subject to
nationalization. Such nationalization may include the expropriation or nullification of IC Power’s existing concessions, licenses, permits, agreements and contracts, as well as effective nationalization
resulting from changes in Bolivian regulatory restrictions or taxes, among other things, that could have an adverse impact on COBEE’s profitability. If COBEE were indeed nationalized, IC Power
cannot assure you that IC Power would receive fair compensation for its interests in COBEE.

IC Power could face nationalization risks in other countries as well. The nationalization of any of IC Power’s operating companies or power generation plants, even if fair compensation for such

nationalization is received, could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

IC Power’s business and profitability may be adversely affected if water rights are limited or denied.

Certain of IC Power’s generation facilities rely on hydroelectric power generation. For example, IC Power recently developed the CDA plant, a 545 MW run-of-the-river hydroelectric project in

Peru. In addition, in Bolivia, COBEE facilities generate power from, among others, ten run-of-the-river hydroelectric plants in the Zongo river valley and four run-of-the-river hydroelectric plants in the
Miguillas river valley.

IC Power owns water rights in Peru, granted by the National Water Authority ( ANA—Autoridad Nacional del Agua ) and in Bolivia granted by the Bolivian Ministry of Energy and
Hydrocarbons. From time to time, local governments and regulators may amend regulations and impose charges pertaining to water rights. Furthermore, IC Power may be unable to obtain, or otherwise
experience difficulty in obtaining, water rights in connection with the construction of new hydroelectric plants, which may impact the viability, design, timing or profitability of a project. Local
governments may also try to impose a royalty or tariff for water use on IC Power’s hydroelectric plants. In addition, several plants are required to leave a percentage of the water available in the river and
therefore may not utilize such water in their generation activities (this reserve is commonly referred to as the ‘ecological waterflow’). Local governments may decide to enact a change in the regulation
or in the calculation of the ecological waterflow, thereby reducing available volumes of water for power generation in IC Power’s plants. Any limitations on IC Power’s current water rights, its ability to
obtain additional water rights, or its ability to effectively utilize its existing rights, could have a material adverse effect on its current hydroelectric plants and its hydroelectric projects.

38

 
 
 
 
 
 
 
 
Risks Related to IC Power’s Distribution Business

IC Power may not achieve the expected benefits of the Energuate acquisition.

In January 2016, IC Power acquired Energuate (comprised of two electricity distribution companies in Guatemala (DEORSA and DEOCSA)), with the expectation that this acquisition would
result in various benefits to IC Power, including a successful initial entry into the electricity distribution sector. Some of those benefits may not be achieved or, if achieved, may not be achieved at the
cost or in the time-frame in which they are expected. Whether IC Power will actually realize the anticipated benefits depends on future events and circumstances, some of which, including market and
regulatory conditions, are beyond IC Power’s control. Future growth in revenues, earnings and cash flow of Energuate will be partly dependent on future economic conditions in Guatemala and
conditions in the Guatemalan electricity distribution industry.

Furthermore, the Energuate acquisition represents IC Power’s initial entry into the electricity distribution business, and IC Power does not have prior experience operating such a business. In

addition, IC Power may experience difficulties in integrating Energuate’s financial reporting, which could result in IC Power’s disclosure controls and procedures and internal controls over financial
reporting being considered ineffective. While IC Power is in the process of evaluating and integrating Energuate’s system of controls into its business, IC Power may be unsuccessful in doing so in a
timely manner.

The tariffs that Energuate charges for the distribution of electricity are determined by CNEE, and unfavorable changes to the distribution tariffs could have a material adverse effect on IC Power’s
results of operations.

The price that Energuate charges consumers for electricity distributed is based on distribution tariffs, consisting of an electricity charge and a Value Added by Distribution ( Valor Agregado de
Distribución ), or VAD, charge, which are determined on the basis of legal and regulatory proceedings by the CNEE every five years. There are seven different tariffs that are applicable to Energuate’s
regulated customers, and each of Energuate’s regulated customer purchases electricity at one of these tariff rates. The VAD component of the distribution tariff is revised every five years with semi-
annual adjustments for inflation and local currency exchange rates against the U.S. Dollar. The tariffs are set by the CNEE.

The process of establishing the distribution tariffs involves several parties, including distribution companies, and takes place over several stages. While the tariffs are intended to be set on the

basis of objective criteria, the CNEE can exercise discretion. The CNEE will reset the VAD charge in January 2019. If the CNEE revises the distribution tariff in a manner that is unfavorable to IC
Power, due to, among other things, political pressure or an economic crisis, such a revision may have a material adverse effect on IC Power’s business, financial condition or results of operations. In
addition, if the semi-annual adjustments to the VAD component of the distribution tariff are insufficient to fully account for inflation or exchange rate fluctuations, these adjustments may have a material
adverse effect on IC Power’s business, financial condition or results of operations. For further information on the regulation of the Guatemalan electricity distribution sector, “ Item 4.B Business
Overview—Our Businesses—IC Power—Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan Electricity Distribution Market. ”

IC Power will be required to make significant capital expenditures to improve Energuate’s transmission grid and service quality and reduce electricity losses.

IC Power believes that additional capital expenditures will be required to, among other things, modernize Energuate’s transmission grid, improve service quality and reduce electricity losses. To

this end, IC Power has invested $28 million in capital expenditures relating to Energuate in the year ended December 31, 2016, and IC Power expects that its capital expenditures will increase in the
coming years. IC Power may finance this capital expenditure program through cash on hand, internally generated funds or financing from the domestic and international capital markets. IC Power’s
ability to make these capital expenditures depends on a variety of factors, including its access to domestic and international capital markets, the results of IC Power’s other subsidiaries and a variety of
operating, regulatory or other contingencies. IC Power may not have the financial resources to make the necessary capital expenditures in a timely manner. In addition, should the CNEE’s revision to the
distribution tariffs Energuate charges to its regulated customers be unfavorable to IC Power, it may be unable to recoup the costs of its capital expenditure program. A failure to make the necessary
capital expenditures in a timely manner and recoup the cost of such program could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

A slowdown in the growth of electricity demand in Guatemala could adversely affect Energuate’s business, financial condition and results of operations.

In times of economic crisis, electricity demand in Guatemala has grown at lower rates due to declines in overall levels of economic activity and has resulted in the deterioration of the ability of

many consumers to pay their electricity bills. A slowdown in the growth of electricity sales or demand or a decline in collection rates from customers due to a deterioration of Guatemalan economic
conditions may have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity. Any such slowdown could also result in Energuate having more contracted
capacity than is actually needed due to a decrease in electricity demand, resulting in higher tariffs that could trigger social unrest and/or political pressures, or an increase in customer defaults.

39

 
 
 
 
 
 
 
 
 
 
 
If Energuate is unable to successfully control electricity losses and improve collection rates, IC Power’s results of operations could be adversely affected.

The percentage of the energy that Energuate purchases, but is unable to distribute to customers, represents Energuate’s electricity losses. Energuate experiences two types of electricity losses:
technical losses and commercial losses. Technical losses occur in the ordinary course of Energuate’s distribution of electricity and include losses due to energy dissipation in conductors and magnetic
losses in transformers, while commercial losses result from customers’ illegal connections, fraud and billing errors. Energuate’s total losses (comprising technical and commercial losses) in the years
ended December 31, 2016 and 2015 were 19.6% and 16.9%, respectively. The distribution tariffs that Energuate charges its regulated customers include a VAD component, which provides for an
allowance determined by the CNEE for losses incurred in the distribution of electricity. To the extent that Energuate’s electricity losses exceed the approximately 15% allowance (which includes both
technical and commercial losses) contemplated in the current formula of the VAD component of the distribution tariff, Energuate will bear the cost of such losses.

IC Power intends to reduce commercial losses through improving customer billing practices to increase collection rates, increasing targeted inspections and meter replacements, implementing a
communication program with local communities and modernizing Energuate’s facilities to reduce tampering, especially in areas where electricity theft has been more prevalent, and IC Power intends to
reduce technical losses by investing in the modernization of Energuate’s transmission grid and distribution system. However, these strategies may not effectively combat Energuate’s electricity losses.
Should Energuate’s electricity losses remain high or increase, this could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

Energuate’s authorizations to provide energy distribution services are non-exclusive. Therefore, Energuate may face more competition from other distributors in certain departments.

Energuate has authorizations to provide energy distribution services within its service area until 2048. However, Energuate’s authorizations are non-exclusive and the MEM has historically

granted and may in the future grant authorizations to one or more competing distribution companies in Energuate’s service area. In addition, Energuate is facing competition within certain of the
departments in which it operates from other distribution companies, which hold authorizations to operate in certain departments located in Energuate’s service area. Competition from other distribution
companies within Energuate’s service area may have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

Defaults by Energuate’s consumers due to, among other causes, a reduction in subsidies, could adversely affect IC Power’s business, results of operations and/or financial condition.

Energuate records a provision for doubtful receivables for past due receivables owed by its customers. Energuate has been, and may continue to be, unable to collect amounts payable from

numerous consumers in arrears. If such debts are not totally or partially settled, this may have a material adverse effect on IC Power’s business, financial condition and results of operations or liquidity.
Additionally, the amount of receivables that IC Power is unable to collect may exceed the provision that IC Power has constituted. Should the amount of debts in arrears from Energuate’s consumers
exceed the amounts IC Power has provisioned, this could have a material adverse effect on IC Power’s business, financial conditions, results of operations or liquidity.

The National Electrification Institute of Guatemala ( Instituto Nacional de Electrificación ), or INDE, currently provides electricity rate subsidies for low-income customers to assist in their

payment of their electricity bills, and as of December 31, 2016, approximately 78% of Energuate’s regulated customers benefited from subsidies from INDE. In December 2016, INDE officially notified
Energuate that it will reduce on a monthly basis over a three year period the subsidy applicable to all customers eligible for such subsidy, eliminating the subsidies for customers with energy
consumption between 89 kWh and 100 kWh by November 2017 and for customers with energy consumption between 61 kWh and 88 kWh by March 2019. In March 2017, INDE announced that the
subsidies would not be eliminated as contemplated by the INDE’s December 2016 announcement. If the operating income generated by INDE is not sufficient to fund the subsidies or the Guatemalan
government suffers from other budgetary constraints, INDE may be required to reduce the subsidies it provides to low-income customers. Any reductions in subsidies provided by INDE may result in
Energuate’s customers being unable to bear the cost of their electricity, which could lead to a decrease in consumption and/or collection rates and an increase in doubtful receivables, as well as social and
political pressure, which could have a material adverse effect on IC Power’s business, financial condition, results of operations or liquidity.

Energuate is subject to comprehensive regulation of its business, which may affect IC Power’s financial performance.

Energuate’s business is subject to extensive regulation by various Guatemalan regulatory authorities, particularly the CNEE. The CNEE regulates and oversees Guatemala’s electricity sector,

and establishes Energuate’s distribution tariffs. If Energuate’s contracted capacity and electricity under its PPAs is insufficient to meet customer demand, Energuate will either have to purchase
electricity on the spot market or there may be rolling blackouts. Energuate may only make energy purchases on the spot market if authorized by the CNEE or pursuant to a PPA that provides that
Energuate may purchase in the spot market if the price in the spot market is more advantageous to Energuate than the PPA price. If Energuate purchases energy in the spot market without CNEE’s
authorization or authorization under Energuate’s PPAs, Energuate will be subject to a fine imposed by the CNEE and could result in Energuate not being permitted to pass through the costs associated
with the spot market purchases to consumers. If Energuate is obligated by the CNEE to make additional and unexpected capital expenditures and is not allowed to adjust its tariffs accordingly, Energuate
will have to bear the cost of these purchases and this may have an adverse effect on Energuate’s business, financial conditions and results of operations.

40

 
 
 
 
 
 
 
 
 
 
 
Furthermore, Energuate has been, and in the future may continue to be, subject to fines and penalties by regulatory authorities for, among others, failure to meet quality and delivery standards,

some of which may be due to causes out of Energuate’s control, such as service disruptions attributable to problems at generation facilities. Fines relating to Energuate’s failure to meet any quality or
delivery standards related to services rendered to customers are payable by granting credits to its customers to offset a portion of their electricity charges, while those not directly related to customers are
paid directly to CNEE. In the year ended December 31, 2016, Energuate paid fines and penalties of $265 thousand as compared to $503 thousand, in the year ended December 31, 2015. In addition,
Energuate is currently subject to ongoing proceedings with respect to fines and penalties for failure to meet quality and delivery standards, which may have a material adverse effect on IC Power’s
business, financial condition and results of operations. If Energuate fails to comply with any of these conditions, the Guatemalan government may seek to impose fines and penalties on IC Power,
terminate Energuate’s authorizations, or require the sale of Energuate’s assets in satisfaction of any fines and penalties imposed on IC Power, each of which could have a material adverse effect on IC
Power’s business, financial condition and results of operations.

In addition, electricity is a utility with high social impact, particularly within the service areas in which Energuate operates. As such, there is frequent public debate and pressure to modify the

regulatory framework for the Guatemalan electricity industry. From time to time, various proposals are made to modify the electricity regulatory framework, and such proposals, if implemented, may
affect Energuate’s ability to conduct its operations profitably, or at all. Both the implementation of Energuate’s strategy for growth and its day-to-day business may be adversely affected by
governmental actions, including changes to current legislation, the termination of national and local authorization licenses or permits, the forced sale of Energuate’s distribution assets in a public auction,
the creation of more rigid criteria for qualification in public energy auctions, a delay in the revision and implementation of new tariffs or a modification of the tariff regime.

Energuate’s authorizations can be terminated if its service levels fall below those required by its authorization agreements with the MEM.

Energuate conducts its electricity distribution business pursuant to authorization agreements which were executed between DEORSA and the MEM and DEOCSA and the MEM. The
authorization agreements require Energuate to comply with certain service and quality standards. CNEE may impose fines in cases where DEORSA and/or DEOCSA fail to meet certain levels of service,
quality standards, or meet customer satisfaction. These procedures may ultimately result in the MEM’s revocation of Energuate’s authorizations pursuant to the regulations under the General Electricity
Law. In the event that Energuate’s authorizations are terminated, Energuate’s distribution assets may, after a series of proceedings, be sold in a public auction, as provided for in the General Electricity
Law. In addition, Energuate’s authorizations are for a fixed term (until 2048) and renewal is neither automatic nor guaranteed. A termination of Energuate’s authorizations would have immediate
negative effects on Energuate’s business and results of operations, which could have a material adverse effect on IC Power’s business, financial condition and results of operations.

Energuate operates in certain conflict zones which have been and may continue to be subject to high levels of electricity theft and other illicit activity, low collection rates and violent protest.

Energuate’s service area includes “conflict zones”, which are areas characterized by high levels of electricity theft and low collection rates. In certain of the “conflict zones” in which Energuate
operates, particularly along the border with Mexico, there is little government control and presence. In such areas, Energuate’s ability to conduct its operations has been, and may continue to be, affected
by illicit activities, such as drug trafficking and violent crime.

Furthermore, Energuate has faced opposition in such areas from a variety of organizations, some of whom promote violent protests and energy theft. In recent years, local organizations in

Energuate’s service area have conducted violent protests to challenge electricity prices. Energuate has undertaken efforts to improve its relationships with the communities in the service areas in which it
operates; however, these efforts may be unsuccessful. Electricity theft and other illicit activity, low collection rates and social protests in certain of the “conflict zones” in which Energuate operates may
have a material adverse effect on IC Power’s business, financial condition and results of operations.

41

 
 
 
 
 
 
 
Risks Related to Our Interest in Qoros

Qoros depends on additional financing to further its development and, until it achieves significant sales levels, to meet its operating expenses, financing expenses, and capital expenditures.

Qoros commenced commercial operations at the end of 2013. Qoros has incurred losses since inception and is continuing to experience losses and negative operating cash flow and expects that

this will continue until it achieves significantly higher levels of sales. Qoros’ operating expenses, debt service requirements, capital expenditures and other liquidity requirements are significant. Until
Qoros experiences a significant increase in sales, it will continue to require additional financing, including the renewal or refinancing of its working capital facilities, to meet these expenses and
requirements, and there is no assurance that Qoros will experience an increase in sales in the near-term, if at all, or obtain additional financing.

Qoros’ available liquidity and capital resources are limited, and it has significant obligations. Qoros has historically relied upon capital contributions, loans, guarantees and pledges from its
shareholders (Chery and Kenon), and third party loans supported by its shareholders, to fund its development and operations. As of December 31, 2016, Qoros total loans and borrowings (excluding
shareholder loans) of RMB5.5 billion and current liabilities (excluding shareholder loans) of RMB4.0 billion, including trade and other payables of RMB2.7 billion. As of December 31, 2016, Qoros had
current assets of RMB1.8 billion, including cash and cash equivalents of RMB465 million. Qoros has long-term, short-term and working capital credit facilities, but amounts available under such
facilities are limited. Qoros actively manages its trade payables, accrued expenses and other operating expenses in connection with the management of its liquidity requirements and resources.

Qoros is continuing to seek additional financing for its operations. For example, in April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may
invest significant amounts in Qoros, subject to government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other agreements. For further
information on this arrangement, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”
Qoros will need to secure additional financing to meet its operating expenses (including accounts payable) and debt service requirements. If Qoros is not able to obtain financing from Yibin or otherwise
raise additional financing as required, it may be unable to continue operations, in which case Kenon may lose its entire investment in Qoros and Kenon may be required to make payments under its back-
to-back guarantees to Chery in respect of Qoros’ bank debt and pledges over Qoros shares by Quantum (Kenon's subsidiary which owns Kenon's interest in Qoros) may be enforced. See “Risks Related
to Our Strategy and Operations—Some of our businesses have significant capital requirements. If these businesses are unable to obtain sufficient financing from third party financing sources or renew
or refinance their working capital facilities, they may not be able to operate, and we may deem it necessary to provide such capital, provide a guarantee or indemnity in connection with any financings,
provide collateral in connection with any financings, including via the cross-collateralization of assets across businesses, or we may refrain from investing further in any such businesses, all of which
may materially impact our financial position and results of operations.”

Qoros’ future success is dependent upon an increase in sales volumes sufficient to meet its operating expenses and continued expansion of its dealer network.

Qoros incurred losses of RMB1.9 billion for the year ended December 31, 2016 and has incurred losses since its inception. Qoros’ success will depend upon Qoros increasing its sales volumes,

which will depend on:

·

·

·

·

·

·

the continued development of the Qoros brand;

customer acceptance of new models, including the Qoros 5 SUV and Qoros 3 GT, which both launched in 2016;

successful development and launch of new vehicle models;

expansion of its dealer network;

build-up of its aftersales and services infrastructure;

achieving material cost reductions;

· managing its procurement, manufacturing and supply processes;

·

·

establishing effective, and continuing to improve, customer service processes; and

securing additional financing to support its operating and capital expenses and further its growth and development.

42

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros’ ability to increase its sales volumes and generate profits will require the execution of effective planning and management processes, and such execution may be influenced by Qoros’

ability to sell its vehicle models within Qoros’ targeted price range, at prices that generate profits for Qoros, and at targeted volumes, as well as factors out of Qoros’ control, such as state of the Chinese
economy.

Qoros sold approximately 24,000 vehicles in 2016, as compared to approximately 14,000 in 2015. However, Qoros will need to significantly increase its sales to meet its operating expenses and

principal payments under its debt facilities. Qoros’ ability to increase its sales will depend, in part, upon its ability to expand its dealer network and increase the proportion of high-performing dealers.
Qoros may have difficulty in continuing to expand its dealer network if existing dealers are not performing well in terms of sales, and if Qoros is not successful in expanding its dealer network, this could
make it difficult for Qoros to significantly increase sales levels. If Qoros is not able to increase its sales, this could have a significant impact on Qoros’ liquidity and future success, as well as on the value
of Kenon’s investment in Qoros, which may result in Kenon’s recognition of an impairment charge in respect of Qoros and could result in Kenon being required to make payments under its guarantees of
Qoros’ debt if Qoros is unable to meet its debt obligations.

Qoros is significantly leveraged.

As of December 31, 2016, Qoros had RMB5.5 billion of outstanding indebtedness consisting of current and non-current loans and borrowings of RMB1.2 billion and RMB4.3 billion,

respectively, excluding shareholder loans. Qoros intends to finance its continued development with additional financing.

Highly leveraged businesses are inherently more sensitive to declines in revenues, increases in expenses and interest rates, and adverse market conditions. This is especially true for Qoros, as

Qoros commenced commercial sales at the end of 2013 and has yet to generate positive cash flows from its operations. Qoros uses a portion of its liquidity to make debt service payments, including
principal payments on its RMB3 billion facility, thereby reducing its ability to use its cash flows to fund its operations, capital expenditures, or future business opportunities. Qoros is currently required
to make principal payments on its RMB3 billion facility and will be required to make principal payments on its RMB1.2 billion facility and RMB700 million facility beginning in August 2017 and May
2018, respectively. Qoros’ lenders have agreed to reschedule principal payments under the RMB3 billion and RMB1.2 billion scheduled to occur in 2017 and 2018, with principal payments scheduled to
occur between 2019 and 2022 (in the case of the RMB3 billion facility) and between 2019 and 2024 (in the case of the RMB1.2 billion facility).

In addition, Qoros’ RMB3 billion syndicated credit facility, RMB1.2 billion syndicated credit facility, and RMB700 million syndicated credit facility contain affirmative and negative
covenants. Those facilities, as well as its other short-term credit facilities, also contain events of default and mandatory prepayments for breaches, including certain changes of control, and for material
mergers and divestments, among other provisions. A significant percentage of Qoros’ assets secures its RMB3 billion syndicated credit facility and, as a result, the amount of collateral that Qoros has
available for future secured debt or credit support and its flexibility in dealing with its secured assets is therefore relatively limited.

Currently, Qoros’ debt-to-asset ratio is higher, and its current ratio is lower, than the allowable ratios set forth in the terms of Qoros’ RMB3 billion syndicated credit facility. In 2014 and 2016,

the syndicated consortium of Qoros’ syndicated credit facility waived Qoros’ compliance with the financial covenants under this facility through the first half of 2017 and the first half of 2020,
respectively. As a result, Qoros will not be required to comply with these financial covenants until July 2020 (or later, if additional waivers are granted). The waivers also provide that, after Qoros enters
into a continuous and sustained operating period, a request for adjustment of the financial covenants, as necessary, can be submitted to the syndicated loan group or the lender under the working capital
facility, as applicable, for consideration. Should Qoros’ debt-to-asset ratio continue to exceed, or its current ratio continue to be less than, the permitted ratios in any period after the waiver period, and
Qoros’ syndicated lenders do not waive such non-compliance or revise such covenants so as to ensure Qoros’ compliance, Qoros’ lenders could accelerate the repayment of borrowings due under Qoros’
RMB3 billion syndicated credit facility.

If Qoros is unable meet its debt service obligations or otherwise comply with other covenants in its credit facilities, this would lead to an event of default. Each of Qoros’ significant debt

facilities above contains a “cross-default” provision which provides for an event of default if any other debt of Qoros in excess of RMB50 million becomes payable prior to maturity, so a default under
other debt facilities would result in a default under the facilities referenced above and a default that leads to acceleration under either facility above will result in an event of default under the other
facility.

In the event that any of Qoros’ lenders accelerate the payment of Qoros’ borrowings, Qoros would not have sufficient liquidity to repay its debt under the syndicated credit facility, or to
maintain payments on its remaining credit facilities. Additionally, as Qoros is significantly leveraged and certain of its assets, including its manufacturing facility and significant portion of its intellectual
property, secures its syndicated credit facility and other indebtedness, if Qoros were unable to comply with the terms of its debt agreements, this could result in the foreclosure upon and loss of certain of
Qoros’ assets, which could have a material adverse effect on Qoros’ business, financial condition, results of operations or liquidity.

43

 
 
 
 
 
 
 
 
 
Kenon has outstanding “back-to-back” guarantee obligations to Chery in respect of guarantees that Chery has given in respect of a significant amount of Qoros’ bank debt and has pledged a
substantial portion of its interests in Qoros to secure Qoros’ bank debt, as well as Chery’s guarantees of Qoros’ debt. Accordingly, if Qoros’ debt facilities become payable due to a default under these
facilities or otherwise, Kenon may be required to make payments under its guarantees and could lose the shares in Qoros it has pledged. See “— Kenon has “back-to-back” guarantee obligations to
Chery in respect of guarantees that Chery has given for Qoros’ bank debt and has pledged a substantial portion of its interests in Qoros to secure Qoros’ bank debt.”

Kenon has “back-to-back” guarantee obligations to Chery in respect of guarantees that Chery has given for Qoros’ bank debt and has pledged a substantial portion of its interests in Qoros to secure
Qoros’ bank debt.

As of the date of this annual report, Kenon has outstanding back-to-back guarantee obligations to Chery of up to RMB425 million, plus certain interest and fees, in respect of certain of Qoros’

indebtedness. For further information on Kenon’s back-to-back guarantee obligations to Chery, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Liquidity and Capital Resources—Kenon’s
Commitments and Obligations—Back-to-Back Guarantees Provided to Chery .”

If Qoros is unable meet its debt service obligations and comply with other covenants in these credit facilities, this would lead to an event of default. In addition, each of these facilities contains
various events of default which may result in the event of non-payment of amounts due and payable, breach of obligations under the facilities and liquidation or bankruptcy events, or other similar legal
proceedings. In addition, each of the facilities above contains a “cross-default” provision which provides for an event of default if any other debt of Qoros in excess of RMB50 million becomes payable
prior to maturity, so a default under other debt facilities would result in a default under the facilities referenced above and a default that leads to acceleration under either facility above will result in an
event of default under the other facility.

In the event of a default under one of these credit facilities which leads to acceleration of amounts due thereunder, Chery could be required to make payments under its guarantees and upon such

payment by Chery, Kenon would be required to make payments under its back-to-back guarantees to Chery.

In the event that Kenon is required to make such payments, it may need to obtain such funds from its businesses, which may include IC Power (via dividends, loans or advances, or the

repayment of loans or advances to us, which may be funded by sales of assets or minority interests in our businesses), or obtain external financing, which may result in dilution of shareholders (in the
event of equity financing) or additional debt obligations for the company (in the event of debt financing). In the event Kenon is required to make payments on its back-to-back guarantees and does not
have sufficient liquidity to do so, there may be a cross-default under the IC Credit Facility, which would require Kenon to obtain additional financing or obtain such funds from its businesses to pay the
outstanding amounts under such facility. In the event that funds from its businesses or external financing are not available to meet such obligations on reasonable terms or at all, Kenon may need to sell
assets to meet such obligations, and its ability to sell assets may be limited in light of the various pledges over the shares and assets within its most valuable asset, IC Power. Any sales of assets may not
be at attractive prices, particularly if such sales must be made quickly to meet Kenon’s obligations.

Finally, Quantum, the wholly-owned subsidiary through which we own our 50% interest in Qoros has pledged, a significant portion of its interest in Qoros to lenders under Qoros’ RMB1.2

billion credit facility, as well as to Chery, which may enforce its pledge in certain circumstances to the extent Chery is required to make payments with respect to its guarantees of Qoros’ debt. For
further information on these pledges, see “ Item 5.B Liquidity and Capital Resources—Qoros’ Liquidity and Capital Resources—Material Indebtedness—RMB1.2 Billion Syndicated Credit Facility ; —
December 2016 Shareholder Loans to Qoros; —March 2017 Shareholder Loans to Qoros.” These pledges could result in a loss of our equity interest in Qoros in the event of a default under the RMB1.2
billion facility (or another facility which results in a cross default under the RMB1.2 billion credit facility), or if Chery is required to make payments under its guarantees of Qoros’ debt. For further
information on the risks related to Kenon’s obligations in respect of Qoros’ debt, see “ —Qoros depends on additional financing to further its development and, until it achieves significant sales levels, to
meet its operating expenses, financing expenses, and capital expenditures. ”

Qoros is a joint venture in which our interest is only 50%.

We have a 50% stake in Qoros, with the remaining 50% interest owned by Wuhu Chery Automobile Investment Co., Ltd., or Wuhu Chery, a subsidiary of Chery, a state controlled holding

enterprise and large Chinese automobile manufacturing company that has been producing automobiles since 1999.

Our joint venture partner, Chery, may enter into additional joint venture agreements, subject to the terms of our Joint Venture Agreement, in the future. Consequently, Wuhu Chery or Chery

may have goals, strategies, priorities, or resources that conflict with our goals, strategies, priorities or resources, which may adversely impact our ability to jointly and effectively own Qoros, undermine
Wuhu Chery or Chery’s commitment to Qoros’ long-term growth, or adversely impact Qoros’ business.

44

 
 
 
 
 
 
 
 
 
 
Furthermore, Chinese regulations prevent us, as a non-Chinese entity, from holding a greater than 50% equity interest in Qoros. As a result, should we invest additional equity into Qoros,

Kenon will not experience an increase in its equity ownership of Qoros. The Joint Venture Agreement provides that Wuhu Chery may purchase our interest in Qoros in the event of the termination of the
Joint Venture Agreement, which is triggered upon the occurrence of certain events, including the nationalization or confiscation, in whole or in substantial part, of Qoros’ assets, Qoros’ bankruptcy,
certain breaches of the Joint Venture Agreement, the occurrence of certain force majeure events, and a deadlock of the board of directors of Qoros as to matters where the lack of a decision could
materially and adversely affect Qoros. In the event of the termination of the Joint Venture Agreement, Wuhu Chery may purchase our interest in Qoros at an agreed upon price or at the price determined
by an independent appraiser selected or appointed, as applicable, pursuant to the valuation procedure set forth in the Joint Venture Agreement.

The Joint Venture Agreement also contains provisions relating to the transfer and pledge of Qoros’ shares, the appointment of executive officers and directors, and the approval of “substantial

matters,” which may prevent us from causing Qoros to take actions that we deem desirable.

In addition, the loans that Ansonia made to our subsidiary Quantum (which were used by Quantum to make back-to-back loans to Qoros) may be converted into equity of Quantum at a discount

to the implied value of Qoros based upon the receipt of third-party financing. Accordingly, upon such conversion, Kenon’s indirect interest in Qoros will be diluted, which will result in economic
dilution and Kenon having less control over Qoros’ business. In connection with the loan agreement, Ansonia also has certain consent rights with respect to actions that we take in respect of our interest
in Qoros. For further information on Ansonia’s agreement to invest in Qoros, see “ Item 5.B Liquidity and Capital Resources—Qoros’ Liquidity and Capital Resources—Material Indebtedness—
Shareholder Loans .”

In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional
vehicle manufacturing base. Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association,
among other agreements. Such further investment, if provided, is expected to dilute Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to
Qoros. For further information, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

For further information on the terms of our Joint Venture Agreement with Chery, see “ Item 4.B Business Overview—Our Businesses—Qoros—Qoros’ Joint Venture Agreement .”

Qoros has entered into certain arrangements and agreements with Chery.

Qoros sources its engines and certain spare parts from Chery in the ordinary course of Qoros’ business, and has entered into various commercial agreements with respect to the provision of such

supplies from Chery. Qoros has amounts payable to Chery in the amount of RMB374 million as of December 31, 2016.

Qoros has also entered into a platform sharing agreement with Chery, pursuant to which Qoros provides Chery with the right to use Qoros’ platform in exchange for a fee. Qoros may also enter

into additional commercial arrangements and agreements with Chery, or parties related to it, in the future.

Additionally, Qoros' business plan contemplates further reliance on Chery and its platform and personnel in connection with Qoros' operations and development of new vehicle models.

Pursuant to the Joint Venture Agreement, all of Qoros’ transactions with related parties are subject to the approval of Qoros’ board of directors, of which Kenon has the right to appoint three of
the six directors. However, Qoros’ related party transactions with Chery could create, or appear to create, potential conflicts of interest when Qoros’ board of directors is faced with decisions that could
have different implications for Qoros and Chery, which may have a material adverse effect on Qoros’ operations and financial position.

Qoros actively manages its trade payables, accrued expenses and other operating expenses in connection with the management of its liquidity requirements and resources, and Qoros has

accounts payable to Chery. Should Qoros be unable to make payments to Chery for its supply of engines, spare parts and other supplies from Chery, this may have a material adverse effect on Qoros’
relationship with Chery. For further information on Qoros’ commercial arrangements with Chery, see Note 30 to Qoros’ consolidated financial statements, included in this annual report.

Qoros’ vehicle models and brand are still evolving and may not be accepted by Qoros’ targeted consumer group, at Qoros’ targeted prices.

Qoros’ brand and business are relatively new, and Qoros’ targeted consumers may not accept Qoros’ models, style or brand at the anticipated or desired velocity, or the anticipated or desired

price, if at all. Specifically, Qoros seeks to manufacture and sell to Chinese consumers Chinese vehicles which comply with recognized international standards, with respect to their design and
operations, and are comparable in quality and price to internationally manufactured vehicles. Qoros’ future business and profitability outlook depends, in large part, upon Qoros’ ability to sell vehicle
models that will be accepted by young, modern, urban consumers, in its targeted price range. The sector of the Chinese automobile market that Qoros targets is currently dominated by foreign brands,
and Chinese car buyers may be slower than expected in accepting a Chinese brand, may have a preference for other Chinese brands, or may not ultimately view Qoros’ vehicle models as an attractive
alternative to foreign brands at the price point targeted by Qoros, if at all.

45

 
 
 
 
 
 
 
 
 
 
 
 
 
Chinese consumers have historically indicated a strong preference for products that are internationally-branded. Such a preference for foreign-branded products could impact the buying patterns
of Qoros’ targeted consumers, which could affect the demand for Qoros’ vehicles and, as a result, also adversely impact Qoros’ margins (e.g., as a result of Qoros increasing the content provided in each
vehicle without concurrently increasing its price) and its sales volumes.

Qoros depends upon a network of independent dealers to sell its automobiles.

As is customary in China, Qoros distributes and services its cars through a network of independent automobile dealers that are engaged on a non-exclusive basis. Dealers maintain the primary
sales and service interface with the ultimate consumer of Qoros’ products and, as a result, the quality of Qoros’ dealerships and its relationship with its distributors are critical to Qoros’ success. Qoros
also expects its dealers to generate the vast majority of the revenues that Qoros expects to receive from the sale of spare parts and aftersales products. Consequently, Qoros’ success is dependent, in large
part, upon a network of dealers, whose salespersons Qoros does not directly employ and therefore cannot control. As a result, Qoros’ dealer network may not achieve the required standards of quality of
service producers within Qoros’ expected timeframe, if at all.

Qoros is still in the process of developing, establishing and expanding its dealer network, which will require Qoros’ dealers to construct their dealerships using their own capital resources, with

sales rebates from Qoros (i.e., dealers are entitled to sales rebates from Qoros if they achieve certain purchase targets or meet certain other criteria). As part of its strategy to increase its sales, Qoros
intends to increase the size of its dealer network by expanding into smaller Chinese cities (e.g., Tier 3 and Tier 4 cities) and creating incentives for its high-performing dealers to open additional points of
sales. Qoros’ development of its dealer network will likely be affected by conditions in the Chinese passenger vehicle market and the Chinese economy, the financial resources available to existing and
potential dealers, the decisions dealers make as a result of the current and future sales prospects of Qoros’ vehicle models, and the availability and cost of the capital necessary to acquire and hold
inventories of Qoros’ vehicles for resale. Qoros’ ability to secure new dealers depends, in part, upon the sales performance of Qoros’ existing dealers. Therefore, Qoros may have difficulty in expanding
its dealer network if existing dealers are not performing well in terms of sales, and if Qoros is unable to expand its dealer network, this could make it difficult for Qoros to significantly increase sales
levels. Continued delays in, or other negative developments with respect to, the expansion of Qoros’ dealer network could have a material adverse effect on Qoros’ business, financial condition, results
of operations or liquidity.

Qoros continues to undertake cost-cutting measures to optimize its cost structure and align its operations with its business plan and the current financial market and economic conditions in China, and
such measures may make it difficult for Qoros to increase sales.

In recent years, Qoros has taken, and may continue to take, steps to reduce its costs and address its low sales and its liquidity situation, including workplace optimization and reduced
promotional spending. Qoros will continue to undertake cost-cutting measures to optimize its cost structure, which may impact Qoros’ ability to successfully conduct its operations. For instance, Qoros
has reduced, and may be required to continue reducing, spending on promotions and other advertising, which could make it difficult for Qoros to significantly increase sales, as brand awareness is
critical to increasing sales in the highly competitive Chinese car industry.

Furthermore, Qoros has and may continue to reduce spending on design and research and development costs for new models, as well as updating and adapting its vehicle platform and
manufacturing facility, which may result in Qoros introducing fewer models on a timely basis, or at all, than it might have otherwise introduced without such-cutting measures. A slower pace in
introducing new models has made, and may continue to make, it difficult for Qoros to attract and retain customers, which is crucial at Qoros’ current stage of development. In addition, further cost
cutting measures may increase Qoros' reliance on Chery and its platform and personnel. For further information on risks related to our relationship with Chery, see “ –Qoros has entered into certain
arrangements and agreements with Chery .”

Qoros’ business is subject to intense competition.

China has been one of the world’s fastest growing economies in terms of GDP in recent years, and has been the fastest growing among major passenger vehicle markets in the world. The

passenger vehicle market in China is highly competitive. Many of the largest global manufacturers, through joint venture relationships with Chinese manufacturers, and numerous established domestic
manufacturers compete within this market. Accordingly, Qoros competes with the established automobile manufacturers, particularly with the European, U.S., Korean and Japanese automakers. Most of
Qoros’ current and potential competitors have longer operating histories, broader customer relationships, greater name recognition, established customer bases, and greater financial, technical,
manufacturing, marketing and other resources. As a result, many of these competitors may be able to devote greater resources to the design, development, manufacturing, distribution, promotion, pricing
sale and support of their products, which could impair Qoros’ ability to operate within this market or adversely impact Qoros’ sales volumes or margins.

46

 
 
 
 
 
 
 
 
 
As the size of the Chinese passenger vehicle market continues to increase, Qoros anticipates that additional competitors, both international and domestic, will seek to enter the Chinese market

and that existing market participants will try to maintain or increase their market share. The decline in growth rate that occurred in 2015 in connection with volatility in the Chinese financial markets and
a slowdown in the Chinese economy resulted in increased competition in China’s automotive market through price reductions, which has resulted in reduced margins. In response to market conditions, in
2016, Qoros announced suggested price reductions on its existing models. In 2017, dealers and OEMs have continued to reduce prices and offer further inducements to purchase vehicles. Qoros expects
the downward pressure on vehicle prices to continue for the next few years.

In addition to reducing margins, increased competition may make it difficult for Qoros to increase sales. If Qoros is unable to increase its sales, or sell its vehicles at its expected margins, in

light of increased competition in the passenger vehicle market, or if vehicle sales in China decrease or do not continue to increase as expected, this could have a material adverse effect on Qoros’
business, financial condition, results of operations or liquidity.

Qoros also faces intense competition in the C-segment SUV market, which it entered in March 2016 with its launch of the Qoros 5 SUV. Although the Chinese C-segment SUV model grew by
23% in 2016 and is one of the fastest growing segments in the Chinese car market, many of Qoros’ competitors in this market continued to upgrade their vehicles and introduced new models in 2016 and
early 2017. For instance, a number of domestic and international SUV models were revamped, or were replaced by a new generation, in 2016. Several new car manufacturers are also expected to join
this market segment, which may make it difficult for Qoros to gain market share in the C-segment SUV market.

Qoros’ success depends, in part, upon its ability to protect, and maintain ownership of, its intellectual property.

Qoros has independently developed and patented, and owns numerous motor vehicle technologies, including technologies related to human machine interface, or HMI, motor vehicles, and
motor vehicle platforms, parts, components and accessories for motor vehicles. Qoros believes that such technologies provide it with a competitive advantage and the platform with which to produce
international-standard vehicles for its targeted Chinese consumers. Additionally, Qoros owns the brands, trade names, trademarks, or emblems developed in connection with, or with respect to, any of its
vehicles. If Qoros fails to protect its intellectual property rights adequately, Qoros’ competitors might gain access to its technology, and its brand or business may be adversely affected. Qoros relies on
copyright, trade secret and patent laws, confidentiality procedures and contractual provisions to protect its proprietary methods and technologies and trademark laws to protect the brands, trade names,
trademarks, or emblems developed in connection with, or with respect to, any of Qoros’ vehicles. Qoros currently holds patents in China, the European Union and the U.S., and has pending patent
applications in various countries. Further, Qoros has trademark registrations and applications in various markets in Asia, the Middle East, Europe, North America, South America, Africa, Australia, and
New Zealand. Patents may not be granted for Qoros’ pending patent applications, and the claims allowed on any issued patents may not be sufficiently broad to protect Qoros’ technologies. Any patents
or trademarks currently held by Qoros, or that may be issued to Qoros in the future, may be challenged, invalidated or circumvented, and any rights granted under these patents or trademarks may not
actually provide Qoros with adequate defensive protection or competitive advantages. Additionally, the process of applying for patent and trademark protection is expensive and time-consuming, and
Qoros may not be able to complete all necessary or desirable patent and trademark applications at a reasonable cost or in a timely manner.

Furthermore, policing the unauthorized use of Qoros’ technology, or trademarks, may prove difficult as the laws of some foreign countries may not be as protective of intellectual property
rights as those of the United States, and mechanisms for enforcement of Qoros’ proprietary rights in such countries may be inadequate. From time to time, Qoros may need to initiate legal action to
enforce its intellectual property rights, to protect its trade secrets, to determine the validity and scope of the proprietary rights of others, or to defend itself against claims of infringement. Qoros has
previously been a defendant in suits with respect to Qoros’ alleged infringement of the intellectual property of other vehicle manufacturers, including with respect to Audi, a claim which was settled in
August 2014. Any such litigation could result in substantial costs and the diversion of limited resources and could negatively affect Qoros’ business, reputation or brand. If Qoros is unable to protect its
proprietary rights (including aspects of its technology platform), Qoros may lose its expected competitive advantage which could have a material adverse effect on Qoros’ business, financial condition,
results of operations or liquidity.

Finally, Qoros has pledged, and, in the future, may further pledge, certain of its intellectual property as collateral for its financing. A default on Qoros’ obligations secured by intellectual
property under the terms of such facility could provide the secured parties with the right to foreclose on, and subsequently sell and/or license, all or a portion of Qoros’ pledged patent rights, which could
materially impair Qoros’ ability to conduct its business.

47

 
 
 
 
 
 
 
The economic, political and social conditions in China affect Qoros’ business.

Substantially all of Qoros’ assets are located in China and Qoros expects that substantially all of its revenue will continue to be derived from its operations in China. Accordingly, Qoros’ results

of operations and prospects are subject, to a significant extent, to the economic, political and legal developments in China. China’s economy differs from the economies of most developed countries in
many respects, including government involvement, level of development, growth rate, control of foreign currency exchange and allocation of resources. The Chinese economy has been transitioning
from a planned economy to a more market-oriented economy. Although the Chinese government has implemented measures emphasizing the utilization of market forces for economic reform, the
reduction of state ownership of productive assets and the establishment of sound corporate governance in business enterprises, a substantial portion of productive assets in China is still owned by the
Chinese government. Additionally, the Chinese government continues to play a significant role in regulating industry by imposing industrial policies and continues to exercise significant control over
China’s economic growth through allocating resources, controlling the payment of foreign currency-denominated obligations, setting monetary policy, and providing preferential treatment to particular
industries or companies.

China’s economy has experienced rapid growth, much of it due to the issuance of debt over the last few years. This debt-fueled economic growth has led to an increase in the money supply and
rising inflation. The Chinese government has implemented various measures from time to time to control China’s rate of economic growth, control inflation and otherwise regulate economic expansion.
These measures include imposing controls on bank credit, limiting loans and enacting other restrictions on economic activities, such as measures to curb property, stock market speculation, and
increasing inflation. These policies and procedures may, from time to time, be modified or reversed, which could lead to a tightening of credit, which measures, if taken, could further reduce the
economic activity in China, reducing Qoros’ ability to obtain additional financing. Additionally, any economic, political or social crisis within China may also lead to a drastic decline in economic
activity which could lead to a decline in the demand for Qoros’ vehicles or the availability of funding. For example, in 2016, China’s GDP grew by 6.7%, representing its lowest GDP growth rate since
1990, according to the National Bureau of Statistics of China, or NBSC. Furthermore, the Shanghai Composite Index experienced significant volatility in 2016. The slowdown in China’s economic
growth, as well as the decline and volatility in China’s stock market, negatively impacted consumption rates and the purchase of costly items, such as vehicles, throughout China.

Furthermore, China’s central government faces a number of issues arising from increased oil dependency. Among these issues are greenhouse gas emissions, heavy haze and urban gridlock due

to fast-growing downtown vehicle fleets. As such, the Chinese government has implemented, and may continue to implement, policies to reduce, or slow down, the growth of the vehicle fleet, or
promote green cars. Some local governments are being required to launch local promotion policies to speed up new energy vehicle development, which are expected to ease state energy security and
local air pollution and traffic congestion problems. These policies may be costly or alter the demand for Qoros’ vehicles, or Qoros may be unable to adjust to changing regulations, which may have an
adverse effect on Qoros’ business, results of operations and financial condition.

Qoros is subject to Chinese regulation and its business or profitability may be affected by changes in China’s regulatory environment.

Local and national Chinese authorities have exercised and will continue to exercise substantial control over the Chinese economy through regulation and state ownership, including rules and

regulations that regulate or affect the Chinese automobile manufacturing process and concern vehicle safety and environmental matters such as emission levels, fuel economy, noise and pollution.
Additionally, China has recently permitted provincial and local economic autonomy and private economic activities, and, as a result, Qoros is dependent upon its relationship with the local governments
in the Jiangsu and Shanghai provinces, among others. As a result, certain of Qoros’ ongoing corporate activities are subject to the approval and regulation of the relevant authorities in China including,
among other things, capital increases and investments in Qoros, changes in the structure of Qoros’ ownership, increases in the production capacity, construction of Qoros’ production facilities, ownership
of trademarks, the formation of subsidiaries, and the inclusion of Qoros’ products in the national catalogue for purposes of selling them throughout China. Qoros’ operations are also sensitive to changes
in the Chinese government’s policies relating to all aspects of the automobile industry. In addition, Qoros’ production facility and products are required to comply with Chinese environmental
regulations.

Qoros has incurred, and expects to incur in the future, significant costs in complying with these, and other applicable, regulations and believes that its operations in China are in material

compliance with all applicable legal and regulatory requirements. The central or local Chinese governments may continue to impose new, conflicting or stricter regulations or interpretations of existing
regulations that would require additional expenditures and efforts by Qoros to ensure its compliance with such regulations or interpretations or maintain its competitiveness and margins. Qoros’ ability to
operate profitably in China may be harmed by any such changes in the laws and regulations, including those relating to taxation, environmental regulations, land use rights, property, or the
aforementioned corporate matters, of China, Jiangsu, Shanghai or any other jurisdiction in which Qoros may do business. Qoros’ failure to comply with such laws and regulations may also result in fines,
penalties or lawsuits, which could have a material adverse effect on Qoros’ business, financial condition, results of operations or liquidity.

48

 
 
 
 
 
 
 
As Qoros' strategy contemplates the development of an NEV, Qoros will be subject to the laws, regulations and policies applicable to NEVs in China. For instance, in recent years, the Chinese

government has offered large subsidies for purchases of electric vehicles. However, these subsidies are expected to be gradually phased out over the next few years, which may affect the demand for
NEVs in China.

The demand for Qoros' vehicles may be affected by conditions in the Chinese passenger vehicle market.

Qoros has strategically located its operations, and designed its vehicle models for consumers, within China so as to directly access one of the largest and the fastest growing automobile markets

in the world. However, the demand for vehicles in the Chinese automobile industry was highly volatile in 2015 and 2016, due largely to weakness in the Chinese economy, and it is uncertain how the
Chinese car industry will be affected going forward. Following the economic slowdown and volatility in the Chinese stock market in 2015, China’s central government enacted a tax policy to incentivize
the sale of domestic vehicles by lowering purchases taxes on certain vehicles, including Qoros’ vehicles, until January 1, 2017 from 10% to 5%. In December 2016, the tax incentive was extended for
2017; effective January 1, 2017, the purchase tax will be 7.5%, before increasing to 10% on January 1, 2018. If the tax policy is unsuccessful or is not extended beyond 2017, this could materially affect
demand for Qoros’ vehicles.

In addition, from time to time, Chinese cities have implemented, and may continue to implement, license plate quota policies, and such quotas may reduce vehicle sales. In the future, Chinese

cities may implement such policies in light of increased concerns about haze and air pollution, oil dependency, urban gridlock and noise pollution. If cities implement license plate quota policies, the
prices for provincial license plates may continue to increase, or if Chinese policies to incentivize domestic vehicle sales prove unsuccessful, demand for passenger vehicles in China may decrease, which
may have a material adverse effect on Qoros’ business, financial conditions, results of operations or liquidity.

Qoros requires qualified personnel to manage its operations.

Qoros’ senior executives and personnel are important to Qoros’ success, the establishment of Qoros’ strategic direction, and the design and implementation of Qoros’ business plan. Qoros also

requires qualified and competent employees to independently direct its day-to-day business operations, execute its business plans, and service Qoros’ customers, dealers, suppliers and other stakeholders.
Qoros’ products and services are highly technical in nature. Therefore, Qoros must be able to attract, recruit, hire, train and retain skilled employees, including employees with the capacity to operate
Qoros’ production line as well as employees possessing core competencies in vehicle design and engineering. In recent years, Qoros has made a number of personnel changes at the executive
management level and in the senior management structure. Such management changes have affected, and any future changes may affect, Qoros’ ability to execute its business plan.

In addition, Qoros must continue to develop talent and leadership capabilities in China, where the amount of skilled employees may be limited. The unavailability of qualified personnel in these

competitive specialties, or the loss of key Qoros executives, could negatively impact Qoros’ ability to meet its growing operational and servicing demands. In addition, unpredictable increases in the
demand for Qoros’ vehicle models may also exacerbate the risk of not having a sufficient number of trained personnel.

In connection with cost-cutting measures implemented in 2015 and 2016, Qoros decreased the size of its workforce. Furthermore, in light of the high demand for skilled employees in the

Chinese automotive industry, certain Qoros employees have left, and may continue to leave, Qoros to join Qoros' competitors. If Qoros fails to hire, train and retain the required number of qualified
personnel to operate its business, or if it experiences excessive turnover, Qoros may experience production/manufacturing delays or other inefficiencies, increased recruiting, training or relocation costs,
or other difficulties, any of which could have a material adverse effect on Qoros’ business, financial condition, results of operations or liquidity.

Qoros is dependent upon its suppliers.

Qoros sources the component parts necessary for its vehicle models from over 100 suppliers. A number of Qoros’ component parts are currently obtained from a single source. Qoros utilizes

such single-source suppliers to manage its expenses and maintain consistency in its component parts. Many of Qoros’ suppliers are European-based with manufacturing facilities in China. Additionally,
Qoros sources its engines and certain spare parts from Chery.

Qoros maintains minimal inventories of the materials, systems, components and parts needed to conduct its manufacturing operations. Therefore, Qoros is dependent upon the continued ability

of its suppliers to deliver such materials, systems, components and parts in sufficient quantities and at such times that will allow Qoros to meet its production schedules. As Qoros, consistent with
industry practice, outsources a significant portion of its components and parts from suppliers, it may be affected by any fluctuations in the expertise and manufacturing capabilities of its suppliers.
Additionally, as Qoros’ suppliers may also supply a significant portion of the components and parts of Qoros’ competitors, such concentration may expose Qoros and its competitors to increased pricing
pressure. Qoros may also be unable to procure the component parts necessary for its vehicle models if the established manufacturers with which it competes have the capacity to influence Qoros’
suppliers. Although Qoros believes it may be able to establish alternate supply relationships and obtain or engineer replacement components in the event a supplier, including Chery or a single-source
supplier, is unable to supply Qoros with a necessary component part at a favorable cost, Qoros may be unable to do so in the short-term, or at all, at prices or costs that it deems favorable. In addition,
although Qoros believes that its component parts are available from many suppliers, qualifying alternate suppliers or developing replacements for certain highly customized components of its vehicles
may be time consuming and costly or may force Qoros to make additional and unexpected modifications to its vehicle models’ designs or schedules. An unexpected shortage of materials, systems,
components or parts, if even for a relatively short period of time, could prevent Qoros from manufacturing its vehicles, cause Qoros to alter its production designs, or prevent Qoros from timely
supplying its dealers with the aftersales parts necessary for the servicing of Qoros’ vehicles. Such occurrences could adversely impact Qoros’ relationships with its dealers or customers and thereby affect
Qoros’ business, financial condition, results of operations or liquidity.

49

 
 
 
 
 
 
 
 
 
 
 
Increases in the prices of raw materials that are included within the component parts Qoros purchases from its suppliers, may increase Qoros’ costs and could reduce Qoros’ profitability if
Qoros cannot recoup the increased costs through increased vehicle prices. As Qoros continues to actively manage its trade payables, Qoros may not be able to maintain favorable arrangements and
relationships with its suppliers and, in particular, may not be able to secure or maintain, as applicable, contractual conditions comparable with those of Qoros’ main competitors.

As of December 31, 2016, Qoros had current trade and other payables of RMB2.7 billion. If Qoros is unable to pay its suppliers on a timely basis, it may be unable to procure on favorable terms

the parts, components and services it requires to continue operating and Qoros has been, and may continue to be, subject to suits or other claims in respect of outstanding payables. For further
information on Qoros’ liquidity and capital resources, see “ Item 5.B Liquidity and Capital Resources—Qoros’ Liquidity and Capital Resources. ” For further information on claims brought by certain of
Qoros’ suppliers, see “ Item 4.B Business Overview—Qoros—Qoros’ Legal Proceedings—Claims by Service Providers. ”

Qoros may experience delays and/or cost overruns with respect to the design, manufacture, launch and financing of new or enhanced models.

Qoros’ business plan contemplates the introduction of new vehicle models, as well as enhanced versions of existing vehicle models, over the short- and long-term. In light of technological

developments, Qoros will need to continually upgrade and adapt its vehicle models, vehicle platform and manufacturing facility in Changshu, as automobile customers generally expect new or enhanced
vehicle models to be introduced frequently. Upgrading and adapting Qoros’ vehicle models and manufacturing facility will require significant investments, whereas in recent years, Qoros has undertaken
cost-cutting measures. Further, there can be no assurance that Qoros will be able to secure the necessary financing to fund the continued introduction and manufacturing of new and enhanced vehicle
models, design future vehicle models that will maintain the high quality standards required for Qoros’ branding image, meet the expectations of its customers, and become commercially viable. Should
Qoros be unable to invest in developing and upgrading its vehicle models and manufacturing facility, Qoros may experience difficulties in introducing and developing new vehicles, including NEVs,
with the latest automobile technology which meets consumer standards. In addition, automobile manufacturers often experience delays and cost overruns in the design, manufacture and commercial
release of new and enhanced vehicle models and any delay in the financing, design, manufacture or launch of Qoros’ new or enhanced models could materially damage Qoros’ brand, the development of
its business and its financial position.

The economic and reputational costs associated with vehicle recalls could have a material adverse effect on Qoros.

From time to time, Qoros may recall certain of its vehicle models to address material performance, compliance or safety-related issues. For example, in July 2015, Qoros voluntarily recalled
6,736 vehicles in connection with information discovered during testing done on frontal impact crashes of new Qoros models under development. As of December 31, 2016, Qoros has completed the
repairs of 93.7% of the outstanding recalls. Qoros’ completion schedule is in line with regulatory guidelines, which require Qoros to complete 90% of the outstanding recalls within a twelve-month
period.

The direct economic costs Qoros may incur in connection with any recalls may include the costs associated with the particular part’s development and replacement and the labor costs associated
with the removal and replacement of the defective part. Vehicle recalls, notwithstanding the size, scope, or whether or not the recall is voluntary, can harm Qoros’ reputation and can cause Qoros to lose
customers and experience a decline in its sales. This is particularly true as Qoros is continuing to develop its brand, as any such recalls may cause consumers to question the safety or reliability of Qoros’
vehicle models. Any direct economic costs incurred or lost sales caused by future vehicle recalls, a failure by Qoros to issue a vehicle recall when appropriate, or Qoros’ failure to issue a vehicle recall
on a timely basis, could have a material adverse effect on Qoros’ reputation, business, financial condition, results of operations or liquidity.

Our independent registered public accounting firm currently relies on an independent registered public accounting firm located in the People’s Republic of China, who are not inspected by the PCAOB,
for assistance in completing their audit work associated with our investment in Qoros, and as such, you are deprived of the benefits of such inspection.

Our independent registered public accounting firm currently relies on an independent registered public accounting firm located in the People’s Republic of China for assistance in completing
the audit work associated with our investment in Qoros. Auditors of companies that are publicly traded in the United States and firms registered with the PCAOB are required to undergo regular Public
Company Accounting Oversight Board, or PCAOB, inspections. However, because Qoros has substantial operations within China, a jurisdiction in which the PCAOB is currently unable to conduct
inspections without the approval of the Chinese government authorities, the audit work conducted in China with respect to Qoros has not been inspected by the PCAOB.

50

 
 
 
 
 
 
 
 
 
Inspections of other auditors conducted by the PCAOB outside of China have, at times, identified deficiencies in those auditors’ audit procedures and quality control procedures, which may be
addressed as part of the PCAOB’s inspection process to improve future audit quality. The lack of PCAOB inspections of audit work undertaken in China prevents the PCAOB from regularly evaluating
audits and quality control procedures conducted in China. As a result, our shareholders may be deprived of the benefits of PCAOB inspections, and may lose confidence in Kenon’s or Qoros’ financial
statements and the procedures and the quality underlying such financial statements.

If the China-based affiliates of the “Big Four” accounting firms, including the auditor of Qoros, were to violate the terms of a settlement agreement with the SEC arising out of proceedings instituted by
the SEC against them in late 2012, such violation could result in the Chinese member firms of the “Big Four” accounting firms being suspended from practicing before the SEC which could, in turn,
delay the timely filing of our, or Qoros’, financial statements with the SEC.

In late 2012, the SEC commenced administrative proceedings under Rule 102(e) of its Rules of Practice and also under the Sarbanes-Oxley Act of 2002 against the mainland Chinese affiliates

of the “Big Four” accounting firms, including the auditor of Qoros. The Rule 102(e) proceedings initiated by the SEC related to the failure of these firms to produce documents, including audit work
papers, in response to the request of the SEC pursuant to Section 106 of the Sarbanes-Oxley Act of 2002.

On January 22, 2014, an SEC administrative law judge, issued an initial decision suspending the Chinese member firms of the “Big Four” accounting firms, including the auditor of Qoros,

from, among other things, practicing before the SEC for six months. In February 2014, the initial decision was appealed. While under appeal and in February 2015, the Chinese member firms of “Big
Four” accounting firms reached a settlement with the SEC. As part of the settlement, each of the Chinese member firms of “Big Four” accounting firms agreed to settlement terms that include a censure;
undertakings to make a payment to the SEC; procedures and undertakings as to future requests for documents by the SEC; and possible additional proceedings and remedies should those undertakings
not be adhered to.

Pursuant to Rule 3-09 of Regulation S-X, Kenon is required to attach Qoros’ separate audited financial statements to this annual report on Form 20-F, and may be required to attach Qoros’
separate audited financial statements to its future annual reports on Form 20-F. Additionally, our independent registered public accounting firm currently relies on a Chinese member firm of the “Big
Four” network for assistance in completing the audit work associated with our investment in Qoros. If the settlement terms are not adhered to, the Chinese member firms of “Big Four” accounting firms
may be suspended from practicing before the SEC which could in turn delay the timely filing of our, or Qoros’, financial statements with the SEC. In addition, it could be difficult for Qoros to timely
identify and engage another qualified independent auditor.

Any such occurrences may ultimately affect the continued listing of our ordinary shares on the New York Stock Exchange, or the NYSE, or our registration with the SEC, or both. Moreover,

any further negative news about the proceedings, any violations of the settlement agreement relating to the proceedings or any future proceedings against these audit firms may adversely affect investor
confidence in companies with substantial mainland China based operations listed in, or affiliated with listings in, the U.S., such as Qoros, which could have a material adverse effect on the price of our
ordinary shares and substantially reduce or effectively terminate the trading of our ordinary shares in the United States.

Risks Related to Our Other Businesses

Risks Related to Our Interest in ZIM

The container shipping industry is dynamic and volatile.

The container shipping industry is dynamic and volatile and has been marked in recent years by instability as a result of the recent global economic crisis and the many conditions and factors

that affect supply and demand in the shipping industry, which include:

·

·

·

·

global and regional economic and geopolitical trends, including armed conflicts, terrorist activities, embargoes and strikes;

the supply of and demand for commodities and industrial products globally and in certain key markets, such as China;

developments in international trade, including trade protectionism;

currency exchange rates;

51

 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

prices of energy resources;

environmental and other regulatory developments;

changes in seaborne and other transportation patterns;

changes in the shipping industry, including mergers and acquisitions, restructurings and alliances;

changes in the infrastructure and capabilities of ports and terminals; and

· weather conditions.

These factors also significantly affect ZIM’s freight rates. Furthermore, rates within the charter market, through which ZIM sources a substantial portion of its capacity, may also fluctuate

significantly based upon changes in demand for shipping services. As global trends continue to change, it remains difficult to predict their impact on the container shipping industry and on ZIM’s
business. If ZIM is unable to adequately respond to market changes, they could have a material adverse effect on its business, financial condition, results of operations and liquidity.

Excess supply of global container ship capacity may limit ZIM’s ability to operate vessels profitably, and lead to overload and/or overcapacity and congestion in certain ports.

Global container ship capacity has increased over the years and continues to exceed demand. As of December 31, 2016, global container ship capacity was approximately 20.3 million 20-foot

equivalent units, or TEUs, spread across approximately 5,100 vessels. According to Alphaliner, excess capacity is projected to further increase, outpacing any expected increase in worldwide demand, as
a result of large global orders for new buildings. Many of these orders are for vessels with carrying capacities of 10,000 TEUs and above, which may increase capacity for each shipping voyage.
Additionally, responses to changes in market conditions may be slower as a result of the time required to build new vessels and adapt to market needs. As shipping companies purchase vessels years in
advance to address expected demand, vessels may be delivered during times of decreased demand or unavailable during times of increased demand, leading to a supply/demand mismatch. The container
shipping industry may continue to face oversupply in the coming years and numerous other factors beyond ZIM’s control may also contribute to an increase in capacity, including deliveries of
refurbished or converted vessels, port and canal congestion, decreased scrapping of older vessels, any decline in the practice of slow steaming, a reduction in the number of void voyages and a decrease
in the number of vessels that are out of service (e.g., vessels that are laid-up, dry-docked, awaiting repairs or are otherwise not available for hire). Excess capacity depresses freight rates and can lead to
lower utilization rates, which may adversely affect ZIM’s revenues, profitability and asset values. Until such capacity is fully absorbed by the container shipping market and, in particular, the shipping
lines on which ZIM’s operations are focused, the industry will continue to experience downward pressure on freight rates and such prolonged pressure could have a material adverse effect on ZIM’s
financial condition, results of operations and liquidity.

Furthermore, in recent years, container ship capacities have increased globally at a faster rate than the rate at which some container ports have increased their capacities, leading to considerable
delays in processing container shipments in affected ports. As a result of longer load and unload times, increases in container ship capacities could increase port congestion, which could have a material
adverse effect on affected shipping lines. In addition, as industry capacity continues to grow, ZIM may have difficulty securing sufficient terminal slots to expand its operations in accordance with its
growth strategy due to the limited availability of port facilities.

ZIM does not benefit from the efficiencies of participating in strategic alliances and the ability to enter into such alliances and the participation in operational partnerships in the shipping industry may
be limited, which may adversely affect ZIM’s business.

The container shipping industry has experienced a reduction in the number of major carriers, as well as a continuation of the trends of strategic alliances and partnerships among container

carriers, which can result in more efficient and better coverage for shipping companies participating in such arrangements. For example, in recent years, COSCO and China Shipping Container Lines
merged into COSCO Shipping, Hanjin Shipping filed for bankruptcy and APL Shipping was acquired by CMA CGM Shipping. In 2017, the shipping industry is expected to experience further
consolidation, including the merger of United Arab Shipping Company and Hapag-Lloyd, the acquisition of Hamburg Sud by Maersk and the merger of three large Japanese carriers.

The recent consolidation in the industry has affected the existing strategic alliances between shipping companies. For example, the Ocean Three alliance, which consisted of CMA CGM

Shipping, United Arab Shipping Company and China Shipping Container Lines, was terminated and replaced by the Ocean Alliance, consisting of COSCO Shipping, CMA CGM Shipping, Evergreen
Marine and Orient Overseas Container Line.

ZIM is not a member of any alliances. As a result, ZIM does not benefit from the economies of scale that many of its competitors are able to achieve through participation in such arrangements.

However, ZIM is party to operational partnerships with other carriers in some of the trade zones in which ZIM operates, and may seek to enter into additional operational partnerships or similar
arrangements with other shipping companies or local operators, partners or agents. If ZIM is not successful in expanding operational partnerships, this could adversely affect its business. In addition,
ZIM’s status as an Israeli company has limited, and may continue to limit, its ability to call on certain ports and has therefore limited, and may continue to limit, ZIM’s ability to enter into alliances or
operational partnerships with certain shipping companies. For further information on the risks related to ZIM’s status as an Israeli company, see “ —Risks Related to the Industries in Which Our
Businesses Operate—The activities of certain of our businesses may be impacted by the geopolitical, economic and security conditions in Israel and the Middle East. ”

52

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Declines in freight rates or other market conditions and other factors, could negatively affect ZIM’s business, financial condition, or results of operations and could thereby result in ZIM’s incurrence of
impairment charges.

At each of its reporting periods, ZIM examines whether there have been any events or changes in circumstances, such as a decline in freight rates or other market conditions, which would

indicate an impairment. Additionally, when there are indications of an impairment, an examination is made as to whether the carrying amount of the operating assets or cash generating units, or CGUs,
exceeds the recoverable amount and, if necessary, an impairment loss is recognized in its financial statements. The projection of future cash flows related to ZIM’s CGU, which is one CGU, is complex
and requires ZIM to make various estimates including future freight or charter rates, bunker prices, earnings from the vessels and discount rates, all of which have been volatile historically.

For example, as a result of conditions in the container shipping market, Kenon conducted an impairment test in relation to its 32% equity investment in ZIM as of June 30, 2016 in accordance

with IAS 28 and IAS 36. Kenon concluded that as of June 30, 2016, the carrying amount of its investment in ZIM was higher than the recoverable amount, and therefore, Kenon recognized an
impairment loss of $72 million with respect to its investment in ZIM in 2016. After the impairment, the carrying amount of Kenon’s 32% equity investment in ZIM is $82 million as of December 31,
2016. ZIM cannot assure that it will not impair its CGU in future years and such impairment charges, if any, could negatively affect ZIM’s and/or Kenon’s results of operations.

An increase in bunker prices may have an adverse effect on ZIM’s results of operations.

Bunker expenses represent a significant portion of ZIM’s operating expenses, accounting for 13.8% and 11.0% of the income from voyages and related services for the years ended December
31, 2015 and 2016, respectively. Bunker prices move in close interdependence with crude oil prices, which have historically exhibited significant volatility. Crude oil prices are influenced by a host of
economic and geopolitical factors that are beyond ZIM’s control, particularly economic developments in emerging markets such as China and India, global terrorism, political instability and tensions in
North Africa and the Middle East, uncertainty regarding the nuclear agreement between the United States and Iran, insurrections in the Niger Delta, and the long-term increase in global demand for oil.

Although current bunker prices are significantly lower than those in 2014, bunker prices increased moderately in the fourth quarter of 2016. Further increases in bunker prices could have a

material adverse effect on ZIM’s business, financial condition, results of operations and liquidity. Historically, and in line with industry practice, ZIM has imposed from time to time surcharges over the
base freight rate ZIM charges to its customers in part to minimize its exposure to certain market-related risks, including bunker price adjustments. However, there can be no assurance that ZIM will be
successful in passing on future price increases to customers in a timely manner, either for the full amount or at all.

ZIM’s bunker consumption is affected by various factors, including the number of vessels being deployed, vessel capacity, pro forma speed, vessel efficiency, the weight of the cargo being
transported, port efficiency and sea conditions. ZIM have implemented various optimization strategies designed to reduce bunker consumption, including operating vessels in “super slow steaming”
mode, trim optimization, hull and propeller polishing and sailing rout optimization. Additionally, ZIM manages part of its exposure to bunker price fluctuations by entering into hedging arrangements
with highly reputable counterparties. ZIM’s optimization strategies and hedging program may not be successful in mitigating higher bunker costs, and any price protection provided by hedging may be
limited due to market conditions, such as choice of hedging instruments, and the fact that only a portion of ZIM’s exposure is hedged. There can be no assurance that ZIM’s hedging arrangements will be
cost-effective, will provide sufficient protection, if any, against rises in bunker prices or that the counterparties will be able to perform under ZIM’s hedging arrangements.

ZIM is highly leveraged and may be unable to comply with its financial covenants or meet its debt service or other obligations. ZIM’s failure to comply with these covenants or meet such obligations,
including as a result of events beyond its control, could adversely affect its business, financial condition, results of operations and liquidity.

As of December 31, 2016, ZIM had approximately $1.5 billion of outstanding loans and liabilities to be repaid between 2017 through 2028, of which $45 million constituted short-term debt.

Many of the financing agreements relating to ZIM’s debt facilities contain covenants and limitations, including:

· Minimum liquidity, fixed charge coverage ratio and total leverage covenants; and

· Other non-financial covenants and limitations such as restrictions on dividend distribution, asset sales, investments and incurrence of debt, as well as various reporting obligations.

53

 
 
 
 
 
 
 
 
 
 
 
In 2016, ZIM approached certain of its creditors to reschedule upcoming payments, and ZIM’s creditors agreed to allow ZIM to defer payments in a total amount of approximately $116 million

originally scheduled for payment during a period of up to 12 months from September 30, 2016 and waived or revised certain covenants to which ZIM is subject.

If ZIM is unable to meet its obligations or refinance its indebtedness as it becomes due, or if ZIM is unable to comply with its covenants, ZIM may have to take disadvantageous actions, such as

(i) reducing financing in the future for investments, acquisitions or general corporate purposes or (ii) dedicating a high level of ZIM’s cash flow from operations to the payment of principal and interest
on indebtedness. As a result, the ability of ZIM’s business to withstand competitive pressures and to react to changes in the container shipping industry could be impaired. If ZIM chooses not to pursue
any of these alternatives and is unable to obtain waivers from the relevant creditors, a breach of any of its debt instruments and/or covenants could result in a default under the relevant debt instruments.
Upon the occurrence of such an event of default, the lenders could elect to declare all amounts outstanding thereunder to be immediately due and payable and, in the case of credit facility lenders,
terminate all commitments to extend further credit. If the lenders accelerate the repayment of the relevant borrowings, ZIM may not have sufficient assets to repay any outstanding indebtedness.
Furthermore, a default or the acceleration of any obligation under a particular debt instrument may cause a default under other material debt or permit the holders of such debt to accelerate repayment of
their obligations pursuant to “cross default” or “cross acceleration” provisions, which could have a material adverse effect on ZIM’s business, financial condition and liquidity. For additional
information, see “ Item 5.B Liquidity and Capital Resources—ZIM’s Liquidity and Capital Resources. ”

Furthermore, ZIM may be unable to generate sufficient cash flows to satisfy its debt service and other obligations. ZIM’s ability to generate cash flow from operations to make interest and

principal payments on ZIM’s debt obligations will depend on its future performance, which will be affected by a range of economic, competitive and business factors. ZIM cannot control many of these
factors, including general economic conditions and the health of the shipping industry. If ZIM’s operations do not generate sufficient cash flow from operations to satisfy its debt service and other
obligations, ZIM may need to borrow additional funds or undertake alternative financing plans, such as refinancing or restructuring its debt, or reducing or delaying capital investments and other
expenses. It may be difficult for ZIM to incur additional debt on commercially reasonable terms, even if ZIM is permitted to do so under its debt agreements, due to, among other things, its financial
condition and results of operations and market conditions. ZIM’s inability to generate sufficient cash flows from operations or obtain additional funds or alternative financing on acceptable terms could
have a material adverse effect on its business.

A decrease in the level of China’s import or export of goods could have a material adverse effect on ZIM’s business.

A significant portion of ZIM’s business originates from China, and ZIM therefore depends on the level of imports and exports to and from China. As China exports considerably more goods
than it imports, any reduction in or hindrance to China-based exports, whether due to decreased demand from the rest of the world, an economic slowdown in China, increased tariffs or other factors,
could have a material adverse effect on ZIM’s business. For instance, the Chinese government has recently implemented economic policies aimed at increasing domestic consumption of Chinese-made
goods. This may have the effect of reducing the supply of goods available for export and may, in turn, result in decreased demand for cargo shipping. In recent years, China has experienced an increasing
level of economic autonomy and a gradual shift toward a “market economy” and enterprise reform. However, many of the reforms implemented, particularly some limited price reforms, are
unprecedented or experimental and may be subject to revision, change or abolition. The level of imports to and exports from China could be adversely affected by changes to these economic reforms by
the Chinese government, as well as by changes in political, economic and social conditions or other relevant policies of the Chinese government. In 2015 and 2016, China experienced its slowest GDP
growth rates since 1990, which affected levels of imports to and exports from China. In response to the recent slowdown in China’s economic growth, China may implement additional trade barriers to
protect their domestic industries against foreign imports, which may depress the global demand for shipping services.

Finally, China’s import and export of goods may also be affected by recent presidential elections in the United States, which may result in an increase in trade protectionism and local

production over foreign trade, which may affect the demand for maritime shipping, particularly to and from China.

Changes in laws and regulations, including with regard to tax matters, and their implementation by local authorities could also affect ZIM’s vessels calling on Chinese ports and could have a

material adverse effect on its business, financial condition and results of operations.

Israel holds a Special State Share in ZIM, which imposes certain restrictions on ZIM’s operations and our equity interest in ZIM.

The State of Israel holds a special share in ZIM, or Special State Share, which imposes certain limitations on the activities of ZIM that may negatively affect ZIM’s business and results of its

operations. The Special State Share, and the permit which accompanies it, also imposes transferability restrictions on our equity interest in ZIM. Furthermore, although there are no contractual
restrictions on any sales of our shares by our controlling shareholders, if Idan Ofer’s ownership interest in Kenon is less than 36%, or Idan Ofer ceases to be the controlling shareholder, or sole
controlling shareholder of Kenon, then Kenon’s rights with respect to its shares in ZIM (e.g., Kenon’s right to vote and receive dividends in respect of its ZIM shares) will be limited to the rights
applicable to an ownership of 24% of ZIM, until or unless the State of Israel provides its consent, or does not object to, this decrease in Idan Ofer’s ownership or “control” (as defined in the State of
Israel consent received by IC in connection with the spin-off). The State of Israel may also revoke Kenon’s permit if there is a material change in the facts upon which the State of Israel’s consent was
based, upon a breach of the provisions of the Special State Share by Kenon, Mr. Ofer, or ZIM, or if the cancellation of the provisions of the Special State Share with respect to a person holding shares in
ZIM contrary to the Special State Share’s provisions apply (without limitation). For further information on the Special State Share, see “ Item 4.B Business Overview—Our Businesses—ZIM—ZIM’s
Special State Share. ”

54

 
 
 
 
 
 
 
 
 
ZIM faces risks as a result of its status as an Israeli corporation.

ZIM is incorporated and its headquarters is located in Israel, and the majority of its key employees, officers and directors are residents of Israel. Accordingly, political, economic and military

conditions in Israel may directly affect ZIM’s business and existing relationships with certain foreign corporations, as well as affect the willingness of potential partners to enter into business
arrangements with ZIM. Numerous countries, corporations and organizations limit their business activities in Israel and their business ties with Israeli-based companies. ZIM’s status as an Israeli
company has limited, and may continue to limit, its ability to call on certain ports and therefore has limited, and may continue to limit, its ability to enter into alliances or operational partnerships with
certain shipping companies, which has historically adversely affected its operations and its ability to compete effectively within certain trades. In addition, ZIM’s status as an Israeli company has limited,
and may continue to limit, its ability to enter into alliances that include certain carriers who are not willing to cooperate with Israeli companies.

Since the establishment of the State of Israel in 1948, a number of armed conflicts have taken place between Israel and its neighboring countries. In recent years, these have included hostilities

between Israel and Hezbollah in Lebanon and Hamas in the Gaza Strip, both of which resulted in rockets being fired into Israel, causing casualties and disrupting economic activities. Recent political
uprisings, social unrest and violence in the Middle East and North Africa, including Israel’s neighbors Egypt and Syria, are affecting the political stability of those countries. This instability has raised
concerns regarding security in the region and the potential for armed conflict. Armed conflicts or hostilities in Israel or neighboring countries could cause disruptions in ZIM’s operations, including
significant employee absences, failure of its information technology systems and cyber-attacks, which may lead to the shutdown of its headquarters in Israel. ZIM’s commercial insurance does not cover
losses that may occur as a result of an event associated with the security situation in the Middle East. Although the Israeli government is currently committed to covering the reinstatement value of direct
damages caused by terrorist attacks or acts of war, ZIM cannot assure you that this government coverage will be maintained, or if maintained, will be sufficient to fully compensate us for damages
incurred. Any losses or damages incurred by us could have a material adverse effect on its business. Any armed conflict involving Israel could adversely affect ZIM’s business and results and operations.

During the 2006 Lebanon War, a military conflict took place in Lebanon. As a result of rocket fire in the city of Haifa, ZIM closed its headquarters for several days. Although ZIM maintains an
emergency plan, such events can have a material adverse effect on its operational activities. Any future deterioration in the security or geopolitical conditions in Israel or the Middle East could adversely
impact ZIM’s business relationships and thereby have a material adverse effect on its business, financial condition, results of operations or liquidity. As an Israeli company, ZIM has relatively high
exposure, compared to many of its competitors, to acts of terror, hostile activities including cyber-attacks, security limitations imposed upon Israeli organizations overseas, possible isolation by various
organizations and institutions for political reasons and other limitations (such as restrictions against entering certain ports). If ZIM’s facilities, including its headquarters, become temporarily or
permanently disabled by an act of terrorism or war, it may be necessary for us to develop alternative infrastructure and ZIM may not be able to avoid service interruptions. Additionally, ZIM’s owned
and chartered vessels, including those vessels that do not sail under the Israeli flag, may be subject to control by the authorities of the State of Israel in order to protect the security of, or bring essential
supplies and services to, the State of Israel. Israeli legislation also allows the State of Israel to use ZIM’s vessels in times of emergency. Any of the aforementioned factors may negatively affect ZIM and
its results of operations. For further information on the risks related to ZIM’s operations in Israel, see “ —Risks Related to the Industries in Which Our Businesses Operate—The activities of certain of
our businesses may be impacted by the geopolitical, economic and security conditions in Israel and the Middle East .” For further information on the risks related to entry into operational partnerships
within the shipping industry, see “ —ZIM does not benefit from the efficiencies of participating in strategic alliances and the ability to enter into such alliances and the participation in operational
partnerships in the shipping industry may be limited, which may adversely affect ZIM’s business .”

ZIM charters a substantial portion of its fleet and the cost associated with chartering such vessels is unpredictable.

ZIM charters a substantial portion of its fleet. As of December 31, 2016, of the 72 vessels through which ZIM provides transport services globally, 65 are chartered, which represents a

percentage of chartered vessels that is higher than the industry average. A rise in charter hire rates may adversely affect ZIM’s results of operations. ZIM is party to a number of long-term charter
agreements. As of December 31, 2016, approximately 48% of ZIM’s chartered vessels (in terms of capacity) are chartered under operational leases for terms exceeding one year. As a result, ZIM may be
unable to take full advantage of short-term reductions in charter hire rates. In addition, some of ZIM’s long-term charter agreements contain rate adjustment mechanisms pursuant to which charter hire
rates will increase if the market rate increases, so ZIM may not benefit from such long-term charter agreements in the event of an increase in market charter hire rates. Furthermore, if ZIM is unable in
the future to charter vessels of the type and size needed to serve its customers efficiently on terms that are favorable to ZIM, if at all, this may have a material adverse effect of on its business, financial
condition, results of operations and liquidity.

55

 
 
 
 
 
 
ZIM currently does not own or charter enough large vessels to support its growth strategy, and ZIM may face difficulties acquiring or chartering larger vessels for its fleet.

Container shipping companies have been incorporating, and are expected to continue to incorporate, larger, more economical vessels into their operating fleets. The cost per TEU transported on
large vessels is less than the cost per TEU for smaller vessels (assuming the vessels are operating at full capacity), as, among other reasons, larger vessels provide increased capacity and fuel efficiency.
As a result, cargo shippers are encouraged to deploy large vessels, particularly within the more competitive trades. According to Alphaliner, vessels in excess of 10,000 TEUs represented approximately
82% of the current global order book based on TEU capacity as of December 2016. Furthermore, a significant introduction of large vessels, including very large vessels in excess of 18,000 TEUs, into
any trade zone will enable the transfer of existing, large vessels to other shipping lines on which smaller vessels typically operate. Such transfers, which are referred to as “fleet cascading,” may in turn
generate similar effects in the other, smaller trade zones in which ZIM operates. ZIM does not currently have agreements in place to procure or charter large container vessels, and the continued
deployment of larger vessels by ZIM’s competitors will adversely impact ZIM’s competitiveness if ZIM is not able to acquire, charter or obtain financing for such vessels on attractive terms or at all.
This risk is further exacerbated due to ZIM’s inability to participate in certain alliances and thereby access lager vessels for deployment. Even if ZIM is able to acquire or charter larger vessels, ZIM may
be unable to achieve utilization rates necessary to operate such vessels profitably.

The expansion of the Panama Canal may have an adverse effect on ZIM’s results of operations.

The Panama Canal plays a key role in the delivery of cargo to the United States via the U.S. east coast and the Gulf of Mexico. With the completion of Panama Canal expansion project in June
2016, the Panama Canal can accommodate container vessels with capacities of 13,000-14,000 TEUs, which can then access via the Panama Canal the Pacific trade zone, which is one of ZIM’s strategic
trade zones. The introduction of such vessels within this trade zone may require shipping liners seeking to remain competitive, including ZIM, to alter their fleet composition and incorporate larger
vessels into their Panama Canal operations. ZIM currently does not have any agreements in place to procure or charter-in large container vessels. If ZIM’s competitors successfully deploy large vessels
into this trade, a significant portion of its vessels will become increasingly less efficient to operate via the Panama Canal and, if ZIM is unable to incorporate larger vessels into its fleet, this could
adversely affect the business within this key trade zone. ZIM may need to reroute some of ZIM’s shipping lines to remain competitive and cannot predict the effects of any such changes in the shipping
lines.

ZIM is subject to environmental regulation and failure to comply with such regulation could have a material adverse effect on ZIM’s business.

ZIM is subject to many legal provisions relating to the protection of the environment, including the emissions of hazardous substances, sulfur oxides, or SOx, and nitrogen oxides, or NOx, and
the use of low-sulfur fuel or shore power voltage, all of which may be subject to ongoing developments and amendments. For example, ZIM is subject to the International Convention for the Prevention
of Pollution from Ships (including designation of Emission Control Areas thereunder), the International Convention for the Control and Management of Ships Ballast Water & Sediments, the
International Convention on Liability and Compensation for Damage in Connection with the Carriage of Hazardous and Noxious Substances by Sea of 1996, the Oil Pollution Act of 1990, the
Comprehensive Environmental Response, Compensation and Liability Act, the Clean Water Act, and National Invasive Species Act, among others. Compliance with such laws, regulations and
standards, where applicable, may require the installation of costly equipment or operational changes. ZIM may also incur additional compliance costs, and any such costs could have a material adverse
effect on its business. If ZIM fails to comply with any of the environmental regulations applicable, ZIM could be exposed to significant environmental liability damages, criminal charges, and substantial
harm to its operations and reputation. Additionally, environmental laws often impose strict liability for remediation of spills and releases of oil and hazardous substances, which could subject ZIM to
liability without regard to whether ZIM is negligent or at fault.

Environmental requirements may also require a reduction in cargo capacity, ship modifications or operational changes or restrictions, lead to decreased availability of or more costly insurance
coverage for safety and environmental matters or result in ZIM’s denial of access to certain jurisdictional waters or ports, or its detention in certain ports. Under local, national and foreign laws, as well
as international treaties and conventions, ZIM could incur material liabilities, including cleanup obligations, natural resource damages, personal injury and property damage claims in the event there is a
release of petroleum or other hazardous materials from its vessels, or otherwise, in connection with its operations. Violations of, or liabilities under, safety and environmental requirements can result in
substantial penalties, fines and other sanctions, including in certain instances, seizure or detention of its vessels and events of this nature could have a material adverse effect on ZIM’s business,
reputation, financial condition and results of operations.

56

 
 
 
 
 
 
 
The shipping industry is subject to extensive government regulation and standards, international treaties and trade prohibitions and sanctions.

The shipping industry is subject to extensive regulation that changes from time to time and that applies in the jurisdictions in which shipping companies are incorporated, the jurisdictions in

which vessels are registered (flag states), the jurisdictions governing the ports at which vessels call, as well as regulations by virtue of international treaties and membership in international associations.
As a global container shipping company, ZIM is subject to a wide variety of international, national and local laws, regulations and agreements. As a result, ZIM is subject to extensive government
regulation and standards, customs inspections and security checks, international treaties and trade prohibitions and sanctions, including laws and regulations in each of the jurisdictions in which we
operate, including those of the State of Israel, the U.S. Federal Maritime Commission, the International Safety Management Code, or the ISM Code, and the European Union. Any violation of such laws,
regulations, treaties and/or prohibitions could have a material adverse effect on ZIM’s business, financial condition, results of operations and liquidity and may also result in the revocation or non-
renewal of its “time-limited” licenses. Furthermore, the U.S. Department of the Treasury’s Office of Foreign Assets Control administers certain laws and regulations that impose restrictions upon U.S.
companies and persons and, in some contexts, foreign entities and persons, with respect to activities or transactions with certain countries, governments, entities and individuals that are the subject of
such sanctions laws and regulations. Similar sanctions are imposed by the European Union and the United Nations. ZIM are acting in accordance with the applicable sanction laws. Under economic and
trading sanction laws, governments may seek to impose modifications to business practices, and modifications to compliance programs, which may increase compliance costs, and may subject us to
fines, penalties and other sanctions.

Additionally, ZIM is subject to competition and antitrust regulations in each of the countries where ZIM operates. In most of the jurisdictions in which ZIM operates, operational partnerships

among shipping companies are generally exempt from the application of antitrust laws, subject to the fulfillment of certain exemption requirements. Recently, however, there has been a trend within the
international community to limit such exemptions and it is difficult to predict whether existing exemptions or their renewal will be affected in the future. ZIM is party to numerous operational
partnerships and view these agreements as competitive advantages in response to the market concentration in the industry as a result of mergers and global alliances, as well as the global economic crisis.
An amendment to or a revocation of any of the exemptions for operational partnerships that ZIM rely on could negatively affect ZIM’s business and results of operations.

There are numerous risks related to the operation of any sailing vessel and ZIM’s inability to successfully respond to such risks could have a material adverse effect on ZIM.

There are numerous risks related to the operation of sailing vessels, including dangers associated with potential port closures, marine disasters, mechanical failures, collisions, lost or damaged

cargo, contraband smugglers, poor weather conditions, the content of the load, exceptional load, meeting deadlines, risks of documentation, maintenance and the quality of fuels, piracy, shortages of
containers, shortages of qualified sea and shoreside personnel and maritime arrests arising from unsatisfied debts, claims or damages. The occurrence of any of the aforementioned risks could have a
material adverse effect on ZIM’s business, financial condition, results of operations or liquidity and ZIM may not be adequately insured against any of these risks.

In the event ZIM lists its shares on a stock exchange for trading, changes in the market price of ZIM’s stock could have a material adverse effect on the value of our investment in ZIM.

ZIM may seek a public listing of its shares. Upon such listing, our ability to liquidate our 32% equity interest in ZIM, without adversely affecting the value of these shares, may be limited. If we

were to sell, or indicate an intention to sell, substantial amounts of our equity interest in ZIM in the public market, the trading price of ZIM’s shares could decline. Additionally, the perception in the
market that these sales may occur could also cause the trading price of ZIM’s shares to decline. Furthermore, the value of our interest in ZIM may be affected by economic and market conditions that are
beyond our control. Globally traded securities have been highly volatile and continued volatility, which may result in significant changes in ZIM’s market price, in particular, could also have a material
adverse effect on our business, financial condition, results of operations or liquidity. If ZIM does not complete a listing of its shares, this would affect our ability to sell our equity interest in ZIM, if we
decide to do so.

We may be required to record a significant charge to our earnings if we are required to impair our investment in ZIM.

As a result of conditions in the container shipping market, Kenon conducted an impairment test in relation to its 32% equity investment in ZIM as of June 30, 2016 in accordance with IAS 36

and IAS 28. Kenon concluded that as of June 30, 2016, the carrying amount of its investment in ZIM was higher than the recoverable amount, and therefore, Kenon recognized an impairment loss of $72
million with respect to its investment in ZIM in 2016. After the impairment, the carrying amount of Kenon’s 32% equity investment in ZIM is $82 million as of December 31, 2016. If ZIM is not
commercially successful or, if due to economic or other conditions, our assumptions regarding the performance of ZIM are not achieved or are revised downward, we would likely be required to record
further impairment charges. Given the current economic and competitive environment, and the uncertainties regarding the impact on such restructuring and environment on ZIM, we cannot assure you
that the estimates and assumptions made for purposes of our impairment testing will prove to be accurate predictions for the future. Additionally, any public listing of ZIM’s shares may also affect the
value of our interest in ZIM and may therefore result in our recognition of an impairment charge in respect of our investment in ZIM. Any impairment charges in respect of our investment in ZIM could
have a material adverse effect on our financial condition or results of operations.

57

 
 
 
 
 
 
 
 
 
Risks Related to our Other Businesses

Primus relies on Kenon to finance its operations.

The implementation of Primus’ business plan requires additional capital to enable Primus to continue to develop its commercial operations. Primus expects such funding to be provided by us

either through capital contributions or shareholder loans, or by new investors in Primus.

Primus is currently seeking to raise capital from new investors. However, there is no certainty that additional financing will be provided to Primus, either by us or new investors in Primus. In

addition, in the event of new investments in Primus, such investments may serve to dilute our equity interest in Primus. Any lack of, or delay in securing, such financing may delay, or prevent
completely, Primus’ ability to continue to research and develop its commercial operations, which may result in Primus’ ultimate liquidation or dissolution.

Primus’ STG+ process may not become commercially viable.

Demand for and industry acceptance of Primus’ technologies is subject to a high level of uncertainty. If potential customers fail to accept Primus’ technologies, if acceptance develops slower

than anticipated by Primus, or if Primus’ technologies prove uneconomical or unattractive, this could have a material adverse effect on Primus’ business, financial condition, results of operations or
liquidity.

Primus is an early stage company with a limited operating history.

Primus is an early stage company. The risks and uncertainties associated with the operation of an early stage company include a potential inability to:

·

·

·

·

·

·

·

·

commence projects on the current, or any revised, schedule in compliance with the budget;

secure necessary capital;

successfully negotiate with government agencies, vendors, customers, feedstock suppliers or other third parties;

effectively manage rapid growth in personnel or operations;

successfully manage its existing, or enter into new, strategic relationships and partnerships;

recruit and retain key personnel;

adequately protect its intellectual property; and

develop technology, products or processes that complement existing business strategies or address changing market conditions.

If Primus is unable to adequately address any of these risks, this could have a material adverse effect on Primus’ business, financial condition, results of operations or liquidity.

Primus’ STG+ process may not generate methanol or fuel that satisfies required specifications.

The commercialization of Primus’ technology contemplates the production of liquids that satisfy certain specifications. If any of the liquids produced by Primus’ STG+ process are unable to

satisfy required specifications, Primus may be unable to market and commercialize its proprietary liquids technology, the STG+ process. Any change in such specifications, could increase Primus’
expenses or delay the commercialization or viability of Primus’ gas monetization technology, which could have a material adverse effect on Primus’ business, financial condition, results of operations or
liquidity.

58

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Primus’ operations are highly dependent upon commodity prices, particularly natural gas, methanol and gasoline.

Primus’ operations depend substantially on the prices of various commodities, including natural gas, gasoline, crude oil, methanol and others. The prices of certain of these commodities are

volatile, and this volatility may affect Primus’ ability to market its technology and processes.

The liquids that Primus produces using its STG+ process (gasoline and methanol) will compete in markets with refined petroleum products. Because natural gas, or syngas derived from natural

gas, will be primarily used as the feedstock in Primus’ STG+ process, an increase in natural gas prices relative to prices for refined petroleum products, or a decrease in prices for refined petroleum
products, could adversely affect demand for Primus’ technology. The price and availability of natural gas and refined products may be affected by numerous factors, including the level of consumer
product demand, weather conditions, the availability of water for fracking, domestic and foreign government regulation (including regulation of fracking), the actions of the Organization of Petroleum
Exporting Countries, political conditions in oil and natural gas producing countries, the supply of domestic and foreign crude oil and natural gas, the location of any plants developed by Primus vis-á-vis
natural gas reserves and pipelines, the capacities of such pipelines, fluctuations in seasonal demand, governmental regulations, the price and availability of alternative fuels and overall economic
conditions. For example, recent trends in crude oil prices have led to significant declines in gasoline prices which affects the economic feasibility of new projects using the STG+ technology. Primus
cannot predict future demand and prices for natural gas or refined products, and a relative increase in the price of natural gas could have a material adverse effect on its business, financial condition,
results of operations or liquidity.

The decrease in the cost of fuel or electricity generated by traditional sources may cause the demand for the services provided by Primus to decline.

Decreases in the costs associated with traditional sources of fuel or electricity, such as prices for commodities like crude oil, coal, fuel oil and natural gas, have reduced, and could adversely

affect the demand for the solutions provided by Primus. Crude oil prices, for example, have fallen considerably in recent years. The cost of fuel may be further reduced by changing global supply-
demand dynamics, the discovery of large new deposits of traditional fuels and technological progress, among other causes. These fuel price reductions have, and future reductions could further, reduce
the demand for the solutions offered by Primus.

Primus’ success depends, in part, upon its ability to protect its intellectual property.

Primus has independently developed, patented and owns numerous processes related to liquids synthesis, gasoline composition, and incremental improvements and customizations. If Primus

fails to protect its intellectual property rights adequately, its competitors might gain access to its technology, and its competitive advantage, brand or business may be adversely affected.

Primus relies on trade secret and patent laws, confidentiality procedures and contractual provisions to protect its proprietary methods and processes. Primus currently holds several patents and

has pending patent applications in the U.S. Valid patents may not be issued from Primus’ pending applications, and the claims allowed on any issued patents may not be sufficiently broad to protect
Primus’ STG+ process. Any patents currently held by Primus or that may be issued to Primus in the future may be challenged, invalidated or circumvented, and any rights granted under these patents
may not actually provide Primus with adequate defensive protection or competitive advantages. Additionally, the process of applying for patent protection is expensive and time-consuming, and Primus
may not be able to complete all necessary or desirable patent applications at a reasonable cost or in a timely manner.

Policing unauthorized use of technology may prove difficult for Primus as the laws of some foreign countries may not be as protective of intellectual property rights as those of the United
States, and mechanisms for the enforcement of Primus’ proprietary rights in such countries may be inadequate. From time to time, Primus may need to initiate legal action to enforce its intellectual
property rights, to protect its trade secrets, to determine the validity and scope of the proprietary rights of others, or to defend itself against claims of infringement. Such litigation could result in
substantial costs and the diversion of limited resources and could negatively affect Primus’ business, reputation or brand. If Primus is unable to protect its proprietary rights, it may lose its expected
competitive advantage which could have a material adverse effect on its business, financial condition, results of operations or liquidity.

Risks Related to Our Spin-Off

The potential indemnification of liabilities to IC pursuant to the Separation and Distribution Agreement may require us to divert cash to IC to satisfy our indemnification obligations.

We entered into a Sales, Separation and Distribution Agreement with IC, or the Separation and Distribution Agreement, which provides for, among other things, indemnification obligations

designed to make us financially responsible for liabilities incurred in connection with our businesses, and as otherwise allocated to us in the Separation and Distribution Agreement. If we are required to
indemnify IC under the circumstances set forth in the Separation and Distribution Agreement, we may be subject to substantial liabilities, which could have a material adverse effect on our business,
financial condition, results of operations or liquidity.

59

 
 
 
 
 
 
 
 
 
 
 
 
There can be no assurance that IC’s indemnification of certain of our liabilities will be sufficient to insure us against the full amount of those liabilities, or that IC’s ability to satisfy its indemnification
obligation will not be impaired in the future.

Pursuant to the Separation and Distribution Agreement, IC has agreed to indemnify us for certain liabilities retained by it (which includes certain specified pending legal matters). However,

third parties could seek to hold us responsible for any of the liabilities that IC has agreed to retain, and there can be no assurance that the indemnity from IC will be sufficient to protect us against the full
amount, or any, of such liabilities, or that IC will be able to satisfy its indemnification obligations. Moreover, even if we ultimately succeed in recovering from IC any amounts for which we are held
liable, we may be temporarily required to bear these losses ourselves. Additionally, IC’s insurers may deny coverage to us for liabilities associated with occurrences prior to the spin-off. Even if we
ultimately succeed in recovering from such insurance providers, we may be required to temporarily bear such loss of coverage. If IC is unable to satisfy its indemnification obligations or if insurers deny
coverage, the underlying liabilities could have a material adverse effect on our business, financial condition, results of operations or liquidity.

Risks Related to Our Ordinary Shares

Our ordinary shares are traded on more than one stock exchange and this may result in price variations between the markets.

Our ordinary shares are listed on each of the NYSE and the TASE. Trading in our ordinary shares therefore takes place in different currencies (U.S. Dollars on the NYSE and New Israeli

Shekels on the TASE), and at different times (resulting from different time zones, different trading days and different public holidays in the United States and Israel). The trading prices of our ordinary
shares on these two markets may differ as a result of these, or other, factors. Any decrease in the price of our ordinary shares on either of these markets could cause a decrease in the trading prices of our
ordinary shares on the other market.

If securities or industry analysts do not publish research or reports about our business, or publish negative reports about our business, our share price and trading volume could decline.

There is no analyst coverage of Kenon outside of Israel. The trading market for our ordinary shares depends, in part, upon the research and reports that securities or industry analysts publish

about us or our businesses. If securities or industry analysts do not cover us, we could lose visibility in the financial markets, which could cause our share price or trading volume to decline.

A significant portion of our outstanding ordinary shares may be sold into the public market, which could cause the market price of our ordinary shares to drop significantly, even if our business is doing
well.

A significant portion of our shares are held by Ansonia, which holds approximately 58% of our shares. If Ansonia sells, or indicates an intention to sell, substantial amounts of our ordinary
shares in the public market, the trading price of our ordinary shares could decline. The perception that any such sales may occur, including the entry of any of Ansonia into programmed selling plans,
could have a material adverse effect on the trading price of our ordinary shares and/or could impair the ability of any of our businesses to raise capital.

Control by principal shareholders could adversely affect our other shareholders.

Ansonia beneficially owns approximately 58% of our outstanding ordinary shares and voting power. Ansonia therefore has a continuing ability to control, or exert a significant influence over,

our board of directors, and will continue to have significant influence over our affairs for the foreseeable future, including with respect to the election of directors, the consummation of significant
corporate transactions, such as an amendment of our constitution, a merger or other sale of our company or our assets, and all matters requiring shareholder approval. In certain circumstances, Ansonia’s
interests as a principal shareholder may conflict with the interests of our other shareholders and Ansonia’s ability to exercise control, or exert significant influence, over us may have the effect of causing,
delaying, or preventing changes or transactions that our other shareholders may or may not deem to be in their best interests.

In addition, the loans that Ansonia made to our subsidiary Quantum (which were used by Quantum to make back-to-back loans to Qoros) may be converted into equity of Quantum at a discount

to the implied value of Qoros based upon the receipt of third-party financing. Accordingly, upon such conversion, Kenon’s indirect interest in Qoros will be diluted, which will result in economic
dilution and Kenon having less control over the Qoros’ business. In connection with the loan agreement, Ansonia also has certain consent rights with respect to actions that we take in respect of our
interest in Qoros. For further information on Ansonia’s agreement to invest in Qoros, see “ Item 5.B Liquidity and Capital Resources—Qoros’ Liquidity and Capital Resources—Material Indebtedness—
Shareholder Loans .”

60

 
 
 
 
 
 
 
 
 
 
 
 
We do not have sufficient distributable profits to pay dividends.

Under Singapore law and our constitution, dividends, whether in cash or in specie, must be paid out of our profits available for distribution. We have no current plans to pay cash dividends for

the foreseeable future and we currently do not have distributable profits from which dividends may be declared. The availability of distributable profits is assessed on the basis of Kenon’s standalone
unconsolidated accounts (which are based upon the Singapore Financial Reporting Standards, or the SFRS). There is no assurance that, on such basis, we will not incur losses, that we will become
profitable, or that we will have sufficient distributable income that might be distributed to our shareholders as a dividend or other distribution in the foreseeable future. Therefore, we will be unable to
pay dividends to our shareholders unless and until we have generated sufficient distributable reserves. Accordingly, it may not be legally permissible for us to pay dividends to our shareholders. As a
result, and until such time, if ever, that we declare dividends with respect to our ordinary shares, a holder of our ordinary shares will only realize income from an investment in our ordinary shares if there
is an increase in the market price of our ordinary shares. Such potential increase is uncertain and unpredictable.

Under Singapore law, it is possible to effect either a court-free or court-approved capital reduction exercise to return cash and/or assets to our shareholders. Further, the completion of a court-
free capital reduction exercise will depend on whether our directors are comfortable executing a solvency statement attesting to our solvency, as well as whether there are any other creditor objections
raised (in the event that we have creditors other than IC).

Any dividend payments on our ordinary shares would be declared in U.S. Dollars, and any shareholder whose principal currency is not the U.S. Dollar would be subject to exchange rate fluctuations.

The ordinary shares are, and any cash dividends or other distributions to be declared in respect of them, if any, will be denominated in U.S. Dollars. Shareholders whose principal currency is not
the U.S. Dollar will be exposed to foreign currency exchange rate risk. Any depreciation of the U.S. Dollar in relation to such foreign currency will reduce the value of such shareholders’ ordinary shares
and any appreciation of the U.S. Dollar will increase the value in foreign currency terms. In addition, we will not offer our shareholders the option to elect to receive dividends, if any, in any other
currency. Consequently, our shareholders may be required to arrange their own foreign currency exchange, either through a brokerage house or otherwise, which could incur additional commissions or
expenses.

We are a “foreign private issuer” under U.S. securities laws and, as a result, are subject to disclosure obligations that are different from those applicable to U.S. domestic registrants listed on the NYSE.

We are incorporated under the laws of Singapore and, as such, will be considered a “foreign private issuer” under U.S. securities laws. Although we will be subject to the reporting requirements

of the Exchange Act, the periodic disclosure required of foreign private issuers under the Exchange Act is different from the periodic disclosure required of U.S. domestic registrants. Therefore, there
may be less publicly available information about us than is regularly published by or about other public companies in the United States. We are also exempt from certain other sections of the Exchange
Act that U.S. domestic registrants are otherwise subject to, including the requirement to provide our shareholders with information statements or proxy statements that comply with the Exchange Act. In
addition, insiders and large shareholders of ours will be exempt from the reporting and short-swing profit recovery provisions contained in Section 16 of the Exchange Act and will not be obligated to
file the reports required by Section 16 of the Exchange Act.

As a foreign private issuer, we have followed certain, and may follow, home country corporate governance practices instead of otherwise applicable SEC and NYSE corporate governance requirements,
and this may result in less investor protection than that accorded to investors under rules applicable to domestic U.S. issuers.

As a foreign private issuer, we are permitted to follow certain home country corporate governance practices instead of those otherwise required under the NYSE’s rules for domestic U.S.

issuers, provided that we disclose which requirements we are not following and describe the equivalent home country requirement. For example, foreign private issuers are permitted to follow home
country practice with regard to director nomination procedures and the approval of compensation of officers.

In addition, we are not required to maintain a board comprised of a majority of independent directors and a fully independent nominating and corporate governance committee. We generally

seek to apply the corporate governance rules of the NYSE that are applicable to U.S. domestic registrants that are not “controlled” companies. However, we do not fully comply such rules; for example,
we do not have a fully independent nominating and corporate governance committee. We may, in the future, decide to rely on other foreign private issuer exemptions provided by the NYSE and follow
home country corporate governance practices in lieu of complying with some or all of the NYSE’s requirements.

Following our home country governance practices, as opposed to complying with the requirements that are applicable to a U.S. domestic registrant, may provide less protection to you than is

accorded to investors under the NYSE’s corporate governance rules. Therefore, any foreign private exemptions we avail ourselves of in the future may reduce the scope of information and protection to
which you are otherwise entitled as an investor.

61

 
 
 
 
 
 
 
 
 
 
 
It may be difficult to enforce a judgment of U.S. courts for civil liabilities under U.S. federal securities laws against us, our directors or officers in Singapore.

We are incorporated under the laws of Singapore and certain of our officers and directors are or will be residents outside of the United States. Moreover, most of our assets are located outside of
the United States. Although we are incorporated outside of the U.S., we have agreed to accept service of process in the United States through our agent designated for that specific purpose. Additionally,
for so long as we are listed in the U.S. or in Israel, we have undertaken not to claim that we are not subject to any derivative/class action that may be filed against us in the U.S. or Israel, as applicable,
solely on the basis that we are a Singapore company. However, since most of the assets owned by us are located outside of the United States, any judgment obtained in the United States against us may
not be collectible within the United States.

Furthermore, there is no treaty between the United States and Singapore providing for the reciprocal recognition and enforcement of judgments in civil and commercial matters, such that a final
judgment for the payment of money rendered by any federal or state court in the United States based on civil liability, whether or not predicated solely upon the federal securities laws, would, therefore,
not be automatically enforceable in Singapore. Additionally, there is doubt whether a Singapore court may impose civil liability on us or our directors and officers who reside in Singapore in a suit
brought in the Singapore courts against us or such persons with respect to a violation solely of the federal securities laws of the United States, unless the facts surrounding such a violation would
constitute or give rise to a cause of action under Singapore law. We have undertaken not to oppose the enforcement in Singapore of judgments or decisions rendered in Israel or in the United States in a
class action or derivative action to which Kenon is a party. Notwithstanding such undertakings, it may be difficult for investors to enforce against us, our directors or our officers in Singapore, judgments
obtained in the United States which are predicated upon the civil liability provisions of the federal securities laws of the United States.

We are incorporated in Singapore and our shareholders may have greater difficulty in protecting their interests than they would as shareholders of a corporation incorporated in the United States.

Our corporate affairs are governed by our constitution and by the laws governing corporations incorporated in Singapore. The rights of our shareholders and the responsibilities of the members

of our board of directors under Singapore law are different from those applicable to a corporation incorporated in the United States. Therefore, our public shareholders may have more difficulty in
protecting their interest in connection with actions taken by our management or members of our board of directors than they would as shareholders of a corporation incorporated in the United States. For
information on the differences between Singapore and Delaware corporation law, see “ Item 10.B Constitution. ”

Singapore corporate law may delay, deter or prevent a takeover of our company by a third-party, and as a result of a waiver from application of the Code, our shareholders may not have the benefit of
the application of the Singapore Code on Take-Overs and Mergers, which could adversely affect the value of our ordinary shares.

The Singapore Code on Take-overs and Mergers and Sections 138, 139 and 140 of the Securities and Futures Act, Chapter 289 of Singapore contain certain provisions that may delay, deter or
prevent a future takeover or change in control of our company for so long as we remain a public company with more than 50 shareholders and net tangible assets of US$5 million or more. Any person
acquiring an interest, whether by a series of transactions over a period of time or not, either on his own or together with parties acting in concert with such person, in 30% or more of our voting shares,
or, if such person holds, either on his own or together with parties acting in concert with such person, between 30% and 50% (both inclusive) of our voting shares, and such person (or parties acting in
concert with such person) acquires additional voting shares representing more than 1% of our voting shares in any six-month period, must, except with the consent of the Securities Industry Council of
Singapore, extend a mandatory takeover offer for the remaining voting shares in accordance with the provisions of the Singapore Code on Take-overs and Mergers.

In October 2014, the Securities Industry Council of Singapore waived the application of the Singapore Code on Take-overs and Mergers to the Company, subject to certain conditions. Pursuant

to the waiver, for as long as Kenon is not listed on a securities exchange in Singapore, and except in the case of a tender offer (within the meaning of U.S. securities laws) where the offeror relies on a
Tier 1 exemption to avoid full compliance with U.S. tender offer regulations, the Singapore Code on Take-overs and Mergers shall not apply to Kenon.

Accordingly, Kenon’s shareholders will not have the protection or otherwise benefit from the provisions of the Singapore Code on Take-overs and Mergers and the Securities and Futures Act to

the extent that this waiver is available.

62

 
 
 
 
 
 
 
 
 
Our directors have general authority to allot and issue new shares on terms and conditions and with any preferences, rights or restrictions as may be determined by our board of directors in its sole
discretion, which may dilute our existing shareholders. We may also issue securities that have rights and privileges that are more favorable than the rights and privileges accorded to our existing
shareholders.

Under Singapore law, we may only allot and issue new shares with the prior approval of our shareholders in a general meeting. Other than with respect to the issuance of shares pursuant to

awards made under our Share Incentive Plan 2014 or Share Option Plan 2014, and subject to the general authority to allot and issue new shares provided by our shareholders annually, the provisions of
the Singapore Companies Act and our constitution, our board of directors may allot and issue new shares on terms and conditions and with the rights (including preferential voting rights) and restrictions
as they may think fit to impose. Any such offering may be on a pre-emptive or non-pre-emptive basis. Subject to the prior approval of our shareholders for (i) the creation of new classes of shares and the
(ii) granting to our directors of the authority to issue new shares with different or similar rights, additional shares may be issued carrying such preferred rights to share in our profits, losses and dividends
or other distributions, any rights to receive assets upon our dissolution or liquidation and any redemption, conversion and exchange rights. At the annual general meeting of shareholders held in 2016, or
the 2016 AGM, our shareholders granted the board of directors authority (effective until the conclusion of the annual general meeting of shareholders to be held in 2017, or the 2017 AGM, or the
expiration of the period by which the 2017 AGM is required to be held) to allot and issue ordinary shares and/or instruments that might or could require ordinary shares to be allotted and issued as
authorized by our shareholders at the 2016 AGM and shareholders will be asked to renew this authority at the 2017 AGM. Ansonia, our significant shareholder, may use its ability to control to approve a
grant of such authority to our board of directors, or exert influence over, our board of directors to cause us to issue additional ordinary shares, which would dilute existing holders of our ordinary shares,
or to issue securities with rights and privileges that are more favorable than those of our ordinary shareholders. There are no statutory pre-emptive rights for new share issuances conferred upon our
shareholders under the Companies Act, Chapter 50 of Singapore, or the Singapore Companies Act. Furthermore, any additional issuances of new shares by our directors could adversely impact the
market price of our ordinary shares.

Risks Related to Taxation

We may be classified as a passive foreign investment company, which could result in adverse U.S. federal income tax consequences to U.S. holders of our ordinary shares.

Based upon, among other things, the valuation of our assets and the composition of our income and assets, we do not believe we were a passive foreign investment company, or PFIC, for U.S.

federal income tax purposes for our previous taxable year ended December 31, 2016. However, the application of the PFIC rules is subject to uncertainty in several respects. In addition, a separate
determination must be made after the close of each taxable year as to whether we were a PFIC for that year. Accordingly, we cannot assure you that we will not be a PFIC for our current, or any future,
taxable year. A non-U.S. corporation will be a PFIC for any taxable year if either (i) 75% or more of its gross income for such year is passive income or (ii) 50% or more of the value of its assets (based
on an average of the quarterly values of the assets) during such year is attributable to assets that produce passive income or are held for the production of passive income. For this purpose, we will be
treated as owning our proportionate share of the businesses and earning our proportionate share of the income of any other business in which we own, directly or indirectly, 25% or more (by value) of the
stock. Because the value of our assets for purposes of the PFIC test will generally be determined in part by reference to the market price of our ordinary shares, fluctuations in the market price of the
ordinary shares may cause us to become a PFIC. In addition, changes in the composition of our income or assets may cause us to become a PFIC. As a result, dispositions of operating companies could
increase the risk that we become a PFIC. If we are a PFIC for any taxable year during which a U.S. Holder (as defined below) holds an ordinary share, certain adverse U.S. federal income tax
consequences could apply to such U.S. Holder. For further information on such U.S. tax implications, see “ Item 10.E Taxation—U.S. Federal Income Tax Considerations—Passive Foreign Investment
Company. ”

Tax regulations and examinations may have a material effect on us and we may be subject to challenges by tax authorities.

We operate in a number of countries and are therefore regularly examined by and remain subject to numerous tax regulations. Changes in our global mix of earnings could affect our effective
tax rate. Furthermore, changes in tax laws could result in higher tax-related expenses and payments. Legislative changes in any of the countries in which our businesses operate could materially impact
our tax receivables and liabilities as well as deferred tax assets and deferred tax liabilities. Additionally, the uncertain tax environment in some regions in which our businesses operate could limit our
ability to enforce our rights. As a holding company with globally operating businesses, we have established businesses in countries subject to complex tax rules, which may be interpreted in a variety of
ways and could affect our effective tax rate. Future interpretations or developments of tax regimes or a higher than anticipated effective tax rate could have a material adverse effect on our tax liability,
return on investments and business operations.

63

 
 
 
 
 
 
 
In addition, we and our businesses operate in, are incorporated in and are tax residents of various jurisdictions. The tax authorities in the various jurisdictions in which we and our businesses

operate, or are incorporated, may disagree with and challenge our assessments of our transactions (including any sales or distributions), tax position, deductions, exemptions, where we or our businesses
are tax resident, or other matters. If we, or our businesses, are unsuccessful in responding to any such challenge from a tax authority, we, or our businesses, may be unable to proceed with certain
transactions, be required to pay additional taxes, interest, fines or penalties, and we, or our businesses, may be subject to taxes for the same business in more than one jurisdiction or may also be subject
to higher tax rates, withholding or other taxes. Even if we, or our businesses, are successful, responding to such challenges may be expensive, consume time and other resources, or divert management’s
time and focus from our operations or businesses or from the operations of our businesses. Therefore, a challenge as to our, or our businesses’, tax position or status or transactions, even if unsuccessful,
may have a material adverse effect on our business, financial condition, results of operations or liquidity or the business, financial condition, results of operations or liquidity of our businesses.

Our shareholders may be subject to non-U.S. taxes and return filing requirements as a result of owning our ordinary shares.

Based upon our expected method of operation and the ownership of our businesses following the spin-off, we do not expect any shareholder, solely as a result of owning our ordinary shares, to

be subject to any additional taxes or additional tax return filing requirements in any jurisdiction in which we, or any of our businesses, conduct activities or own property. However, there can be no
assurance that our shareholders, solely as a result of owning our ordinary shares, will not be subject to certain taxes, including non-U.S. taxes, imposed by the various jurisdictions in which we and our
businesses do business or own property now or in the future, even if our shareholders do not reside in any of these jurisdictions. Consequently, our shareholders may also be required to file non-U.S. tax
returns in some or all of these jurisdictions. Further, our shareholders may also be subject to penalties for failure to comply with these requirements. It is the responsibility of each shareholder to file each
of the U.S. federal, state and local, as well as non-U.S., tax returns that may be required of such shareholder.

ITEM 4.                     Information on the Company

A.            History and Development of the Company

We were formed in 2014 to be the holding company of certain companies that were currently owned (in whole, or in part) by IC in connection with our spin-off from IC in January 2015. We

currently own the following subsidiaries and associated companies:

·

·

·

·

a 100% interest in IC Power , a leading owner, developer and operator of power generation and distribution facilities located in key energy markets in Latin America, the Caribbean and
Israel;

a 50% interest in Qoros , a China-based automotive company;

a 32% interest in ZIM , a large provider of global container shipping services; and

a 91% interest in Primus , an innovative developer and owner of a proprietary natural gas-to-liquids technology process.

In connection with our spin-off from IC, we also held a 29% interest in Tower , a NASDAQ- and TASE– listed specialty foundry semiconductor manufacturer. In July 2015, we completed a

pro-rata distribution in specie of substantially all of our interest in Tower. In 2016, we sold our remaining interest in Tower.

We were incorporated in March 2014 under the Singapore Companies Act. Our registered office and principal place of business is located at 1 Temasek Avenue #36-01, Millenia Tower,
Singapore 039192. Our telephone number at our registered office and principal place of business is + 65 6351 1780. We have appointed Gornitzky & Co., Advocates and Notaries, as our agent for
service of process in connection with certain claims which may be made in Israel.

Our ordinary shares are listed on each of the NYSE and the TASE under the symbol “KEN.” We plan to examine the various considerations in respect of our dual listing and, in particular, the

advisability of maintaining or terminating such dual listing. We may, as a result of such examination, delist our ordinary shares from trading on the TASE pursuant to the Securities Law of Israel, 5728—
1968. In the event we do decide to delist our ordinary shares from trading on the TASE, we have undertaken to publish an Immediate Report with the TASE no less than 9 months prior to the delisting.

B.            Business Overview

We are a holding company that operates dynamic, primarily growth-oriented, businesses. The companies we own, in whole or in part, are at various stages of development, ranging from

established, cash generating businesses to early stage companies.

We were established in connection with a spin-off of our businesses from IC to promote the growth and development of our primary businesses, and we are primarily engaged in the operation

of the following businesses: (i) IC Power, a power generation and distribution company that has experienced growth in its revenues and generation capacity since its inception in 2007, in which we have
a 100% equity interest, and (ii) Qoros, a China-based automotive company in which we have a 50% equity interest, that is seeking to deliver international standards of quality, safety, and innovative
features to the large and fast-growing Chinese automotive market and commenced commercial sales at the end of 2013. We will continue to monitor and assess strategic opportunities with respect to our
interests in IC Power and Qoros.

64

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In the case of IC Power, we intend to continue to invest in projects that IC Power expects to generate attractive, risk-adjusted returns, using operating cash flows, project or other financing at the
IC Power level, as well as proceeds resulting from opportunistic dispositions by IC Power of assets, including mature assets. In January 2017, IC Power commenced a roadshow for an IPO of IC Power's
ordinary shares; however, in light of market conditions, IC Power withdrew its IPO, as the IPO was not deemed to be in the best interests of IC Power and Kenon at such time. We are evaluating various
strategic alternatives with respect to our interest in IC Power and its businesses, which may include a future offering, listing, distribution or monetization of IC Power or its subsidiaries.

In the case of Qoros, we have used a significant portion of our liquidity and capital resources that we received in connection with our spin-off from IC to support Qoros through shareholder
loans and guarantees in respect of Qoros’ debt, and we have no obligation to provide further funding to Qoros. In light of our strategy to refrain from material "cross-allocation" (i.e. investing returns
from one business into another), Kenon has been seeking other sources of financing for Qoros, as well as opportunities for Kenon to provide financing to Qoros in connection with a reduction of Kenon's
back-to-back guarantee exposure to Qoros (i.e., investments in Qoros that do not increase Kenon's exposure to Qoros). In line with this strategy, in December 2016 and March 2017, Kenon entered into
agreements with Chery to provide financing to Qoros of up to RMB1,027 million in connection with a full release of Kenon's back-to-back guarantee obligations to Chery (which obligations were
RMB1,100 million, plus certain interest and fees, prior to such investments). Pursuant to these agreements, Kenon has funded shareholder loans of RMB638.5 million in connection with a RMB675
million reduction in its guarantee obligations to Chery, and may fund additional shareholder loans of RMB388.5 million to Qoros in connection with the full release of such back-to-back guarantee
obligations.

Qoros will require additional financing, including the renewal or refinancing of its working capital facilities, to continue to operate and meet its operating expenses and debt service
requirements. If Qoros is not able to raise additional financing as required, it may be unable to continue operations. In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin,
pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional vehicle manufacturing base. Yibin may make significant investments in Qoros upon
government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other agreements. Such further investment, if provided, is expected to dilute
Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to Qoros. For further information, see “ Item 5. Operating and Financial Review and
Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

We will continue to assess opportunities to support Qoros and its liquidity position and fundraising efforts.   In addition, we will consider potential opportunities with respect to our interest in

Qoros, including by potentially providing direct access to Qoros when we believe it is in the best interests of Qoros' development and our shareholders to do so.

We also hold interests in:

·

·

ZIM —A large provider of global container shipping services, which, as of December 31, 2016 operated 72 (owned and chartered) vessels with a total container capacity of 322,566 TEUs,
and in which we have a 32% equity interest; and

Primus , an innovative developer and owner of a proprietary natural gas-to-liquid technology process, in which we have a 91% equity interest.

Kenon remains committed to its strategy to realize the value of its businesses for its shareholders. In connection with this strategy, Kenon may provide its shareholders with direct access to its

businesses, which may include spin-offs, listings, offerings, distributions or monetization of its businesses. Kenon is actively exploring various ways to materialize this strategy in a rational and
expeditious manner. To the extent Kenon monetizes its businesses (i.e., through offerings or sales), it may either distribute the proceeds derived from such transactions to our shareholders or use such
proceeds in connection with our back-to-back guarantees in respect of Qoros’ indebtedness or to repay amounts owing under the IC Credit Facility.

As we execute our strategy, we intend to operate under disciplined capital allocation principles designed to ensure the prudent use of our capital. We intend to refrain from acquiring interests in

new companies outside our existing businesses. We do not intend to materially “cross-allocate” proceeds received in connection with distributions or sales of our interests in any of our businesses,
among our other businesses. We will not make further investments in ZIM.

Our strategy set forth above is designed to promote the growth and development of our primary businesses, maximize value for our shareholders and ensure the prudent use of our capital.

However, we will be required to make determinations over time that will be based on the facts and circumstances prevailing at such time, as well as continually evolving market conditions and outlook.
As a result, we will be required to exercise significant judgment while seeking to adhere to these capital allocation principles in order to maximize value for our shareholders and further the development
of our businesses.

65

 
 
 
 
 
 
 
 
 
 
Our Businesses

Set forth below is a description of our businesses.

References to IC Power’s Adjusted EBITDA and net income set forth below in “— IC Power ” are references to IC Power’s Adjusted EBITDA and net income, as reported by IC Power. For a

description of the differences between IC Power’s Adjusted EBITDA and net income, as reported by Kenon and as reported by IC Power, during the years ended December 31, 2014 and 2015, see “ Item
5. Operating and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges .”

References to IC Power's business segments refer to the business segments of IC Power and not Kenon.

IC Power

IC Power, which accounted for 100% of our revenues in the year ended December 31, 2016, and 94% of our assets as of December 31, 2016, is a leading owner, developer and operator of
power generation facilities located in key energy markets in Latin America, the Caribbean and Israel. Additionally, in January 2016, IC Power completed acquisition of Energuate (comprised of two
electricity distribution companies in Guatemala (DEORSA and DEOCSA)), marking IC Power’s initial entry in the electricity distribution sector. The power generation companies within IC Power’s
portfolio utilize a range of energy sources, including natural gas, hydroelectric, HFO, diesel and wind. IC Power principally focuses its generation operations in Latin American markets, which typically
have higher growth rates of GDP and lower overall and per capita energy consumption, as compared with more developed markets. IC Power believes that economic growth in Latin American markets
will drive increases in overall and per capita energy consumption and therefore require significant additional investments in power generation assets in those markets. As of December 31, 2016, IC
Power’s installed capacity and proportionate capacity were 3,945 MW and 3,152 MW, respectively, including Samay I’s 632 MW cold-reserve thermoelectric plant in Peru, which reached COD in May
2016, CDA’s 545 MW hydroelectric plant located in Peru, which reached COD in August 2016, and Kanan’s 92 MW thermal generation project in Panama, which reached COD in April 2016.

In addition, OPC-Hadera has commenced construction of a cogeneration power station in Israel in June 2016, and the OPC-Hadera plant, which is expected to have a capacity of 140 MW, is

expected to reach its COD by early 2019. IC Power expects that the total cost of completing the OPC-Hadera plant (including the consideration for the acquisition of OPC-Hadera) will be approximately
$250 million. As of December 31, 2016, OPC-Hadera had completed approximately 35% of the project.

Between 2007 and December 31, 2016, IC Power invested approximately $3.2 billion in the acquisition, development and expansion of IC Power’s power generation and distribution assets. Of
this amount, investment in power generation assets represented $2.9 billion, of which 88% represented investments in greenfield development (including investments made in CDA, Samay I and Kanan)
and 12% represented acquisitions. IC Power has financed its greenfield development using a combination of cash on hand, debt financing and investments by minority shareholders at the asset level, and
has financed the acquisitions of its power generation assets using cash on hand.

As of December 31, 2016, of the 3,396 MW that IC Power has added to its installed capacity since Inkia’s formation, 76% was derived from greenfield development projects, consisting
primarily of IC Power’s construction of Kallpa’s combined cycle plant, Peru’s largest power generation facility, the construction of OPC-Rotem’s plant, which became Israel’s first IPP, the construction
of the Samay I project, a cold-reserve thermoelectric plant in Peru, and CDA, a hydroelectric plant in Peru. In the same period, IC Power has acquired businesses with an aggregate installed capacity of
817 MW in Israel and five countries in Latin America.

By successfully pursuing growth opportunities, primarily through contracted greenfield development projects in existing markets and acquisitions of anchor investments in new markets, IC
Power has expanded its regional presence, diversified its generation portfolio through the addition of various facilities which use a range of energy sources, and significantly increased its cash flows.

Additionally, in January 2016, IC Power completed acquisition of Energuate (comprised of two electricity distribution companies in Guatemala (DEORSA and DEOCSA)). As of December 31,
2016, Energuate provided electric service for approximately 1.7 million regulated customers in Guatemala (representing approximately 54% of Guatemala’s regulated distribution customers in 2016) and
distributes energy across approximately 100,000 km 2 in Guatemala, covering approximately 12 million inhabitants. Energuate operates approximately 70,000 km of distribution lines within Guatemala
(representing approximately 83% of Guatemala’s distribution lines), and holds the non-exclusive right to distribute electricity within its service area until 2048. In the years ended December 31, 2016
and 2015, Energuate sold 2,316 GWh and 2,315 GWh of energy, respectively.

66

 
 
 
 
 
 
 
 
 
 
 
IC Power’s generation activities are conducted through various operating companies in which, with the exception of Pedregal, IC Power holds controlling interests. The following graphic sets

forth IC Power’s generation companies as of December 31, 2016 (the percentage of holdings stated alongside each generation company is, in some cases, indirect holdings):

________________

(1) Includes 193 MW capacity from Las Flores. 
(2) Excludes Agua Clara, a 50 MW wind project, which is expected to commence commercial operations in 2018 (subject to the grant of a concession which remains outstanding). 
(3) OPC-Hadera currently operates an 18 MW plant. OPC-Hadera is currently developing a cogeneration plant, which is expected to have capacity of 140 MW.

67

 
 
 
 
The following table sets forth summary operational information regarding each of IC Power’s operating companies and associated company in its power generation business as of December 31, 2016,
according to segment:

Segment
Peru

Country

Entity

  Peru
  Peru

  Peru

  Kallpa
  Samay I

  CDA

Israel

Israel

  OPC-Rotem

Ownership 
Percentage 
(Rounded)

Fuel
75%  Natural Gas
75%  Diesel and Natural

Installed 
Capacity 
(MW) 1

1,063 
632 

Gas
75%  Hydroelectric

80%  Natural Gas 

and Diesel

Israel

  OPC-Hadera

100%  Natural Gas

Central
America

Other

Nicaragua
Nicaragua

Nicaragua
Nicaragua
Guatemala
El Salvador
Panama 

  Corinto
  Tipitapa  
Power
  Amayo I
  Amayo II
  Puerto Quetzal
  Nejapa
  Kanan

Bolivia

  COBEE

Chile

Chile

  Central 

Cardones
  Colmito

Dominican 
Republic
Jamaica

  CEPP

  JPPC

Colombia
Panama

  Surpetroil
  Pedregal 5

65%  HFO
65%  HFO

61%  Wind
61%  Wind
100%  HFO
100%  HFO
100%  HFO

100%  Hydroelectric, 

Natural Gas

87%  Diesel 

100%  Natural Gas 

and Diesel

97%  HFO

100%  HFO

60%  Natural Gas
21%  HFO

Weighted 
Average 
Remaining 
Life 
of Significant
PPAs 
Based on 
Firm 
Capacity 
(Years)

LTM 
Energy 
Sales 
Under 
PPAs
(GWh) 3

Proportionate 
Capacity 2

Type of Asset

797  Greenfield
473  Greenfield

409  Greenfield

352  Greenfield

18  Acquired

46  Acquired
33  Acquired

24  Acquired
14  Acquired
179  Acquired
140  Original Inkia Asset
92  Greenfield

228  Original Inkia Asset

133  Acquired

58  Acquired

65  Original Inkia  

Asset

60  Original Inkia Asset

Acquired / Greenfield /
Acquired

19 
11  Original Inkia Asset

7 
19 

12 

6 4 

9 

2 
2 

8 
8 
— 
1 
4 
] 
1 

— 

1 

3 

1 

1 
1 

6,182
—

509

3,908

88

356
364

142
95
528
807
523

275

—

254

88

390

73
289

545 

440 

18 

71 
51 

40 
23 
179 
140 
92 

228 

153 

58 

67 

60 

31 
54 

                                         Total Operating Capacity

3,945 

3,152 

_________________________

1. Reflects 100% of the capacity of each of IC Power’s assets, regardless of ownership interest in the entity that owns each such asset.
2. Reflects the proportionate capacity of each of IC Power’s assets, as determined by IC Power’s ownership interest in the entity that owns each such asset.
3. Reflects energy sales under PPAs for the year ended December 31, 2016.
4. Reflects the weighted average remaining life of OPC-Rotem’s PPAs with end users based on OPC-Rotem’s firm capacity. The IEC PPA (as defined below), which extends for an 18-year term and

covers OPC-Rotem’s entire firm capacity, provides OPC-Rotem with the option to allocate and sell the generated electricity of the power station directly to end users. OPC-Rotem has exercised this
option and sells all of its energy and capacity directly to 28 end users, as of December 31, 2016. For further information on the IEC PPA, see “ —Regulatory, Environmental and Compliance
Matters—Regulation of the Israeli Electricity Sector. ”

5. Although Pedregal is located in Central America, it is a minority investment. Therefore, from an income statement perspective, it is not part of the Central America segment and Pedregal is only

reflected in IC Power’s share in income of associate.

IC Power’s Strengths

Strong track record in project development, with a disciplined approach to capital structure —IC Power leverages its core competencies—project identification, evaluation, development,

construction and operation—to develop power generation facilities using various technologies in attractive markets that typically have relatively high GDP growth rates and relatively low levels of per
capita energy consumption.

68

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
As of December 31, 2016, of the 3,396 MW that IC Power has added to its installed capacity since Inkia’s formation, 76% was derived from greenfield development projects. For example, in
2012, IC Power completed its third expansion of Kallpa’s gas-powered plant, which is the largest power generation facility in Peru in terms of capacity, by converting it into a combined cycle facility
and thereby adding an additional 292 MW to the facility’s capacity. This expansion was completed on time and below budget. Additionally, in 2013, OPC-Rotem became the first IPP in Israel when IC
Power completed the construction of its 440 MW combined cycle power plant. In 2016, IC Power also completed the development of Samay I’s 632 MW cold-reserve thermoelectric plant in Peru,
CDA’s 545 MW run-of-the-river hydroelectric plant in Peru and Kanan’s 92 MW thermal generation project in Panama.

IC Power’s projects have been developed with a disciplined capital structure, which reflects its commitment to develop projects in accordance with three key fundamental principles. First, IC

Power endeavors to construct projects by entering into turnkey EPC agreements that define the total project cost and the transfer most of the risks of construction delays and cost overruns to IC Power’s
EPC contractors. For example, IC Power constructed Samay I and CDA plants pursuant to EPC contracts. Second, IC Power seeks to secure a revenue stream prior to the construction of its plants by
sourcing and entering into long-term PPAs, which provide IC Power’s development projects with predictable projected margins and cash flows, before construction has commenced. Finally, IC Power
leverages its EPC contracts and PPAs to secure long-term project financing agreements which are generally stand-alone, secured, project-specific, and with no or limited recourse to IC Power. Over the
course of its history, IC Power has secured different types of financings (e.g., leases, local and international bonds, syndicated loans, etc.) during times of changing financial markets and in connection
with its construction of various projects using a range of energy sources.

Long-term PPAs and supply agreements that limit exposure to market fluctuations —Most of IC Power’s generation subsidiaries typically enter into long-term PPAs, which generally limits

their exposure to fluctuations in energy spot market rates, generates stable and predictable margins, and helps to create stability and predictability in IC Power’s cash flows. In the year ended
December 31, 2016, IC Power made 90% of IC Power’s aggregate energy sales (in GWh) pursuant to long-term PPAs. As of December 31, 2016, the weighted average remaining life of IC Power’s
significant PPAs was 8 years, and IC Power has historically sought, and will continue to seek, to renew its long-term PPAs as they expire.

As of December 31, 2016, the majority of IC Power’s PPAs were indexed to the price of the corresponding power plant’s operating fuel prices in U.S. Dollars (for plants that use fuel), and

many of IC Power’s PPAs provided for payment in, or were linked to, the U.S. Dollar, thereby mitigating such plant’s exposure to fuel price and exchange rate fluctuations. Additionally, the
counterparties to IC Power’s long-term PPAs are typically large local distribution companies or non-regulated customers, including subsidiaries of large multi-national corporations, which IC Power
believes have strong credit profiles, mitigating the risk of customer default. Some of IC Power’s major non-regulated customers within Peru and Israel include Southern Peru Copper Corporation,
Sociedad Minera Cerro Verde S.A.A. (a subsidiary of Freeport-McMoRan), Compañía Minera Antapaccay S.A. (a subsidiary of Glencore Xstrata), and Oil Refineries Limited, as well as governments
and quasi-governmental entities.

As its power facilities utilize and are dependent upon natural gas, hydroelectric, HFO, diesel, wind, or a combination of these energy sources, IC Power seeks to enter into long-term supply and

transportation agreements to acquire the necessary fuel for its facilities. For example, Kallpa, Samay I and OPC-Rotem, which own and operate IC Power’s largest plants, are party to long-term supply
agreements, including natural gas supply agreements and transportation services agreements, that are material to their operations.

Attractive footprint in high growth markets —Currently, IC Power’s principal focus is on Latin American markets, which typically have higher growth rates of GDP and lower overall and per

capita energy consumption, as compared with more developed markets. IC Power expects continued growth in these key markets, providing IC Power with the opportunity to generate attractive, risk-
adjusted returns through additional investments in power generation assets in those countries.

IC Power is a leader, and the principal power producer, in its largest market, Peru, one of the fastest growing economies in Latin America, with an average GDP growth of approximately

5% per year from 2010 through 2016, according to the International Monetary Fund, a mature regulatory framework, and a well-run power system. In May 2016 and August 2016, Samay I (a 632 MW
cold-reserve thermoelectric plant) and CDA (a 545 MW hydroelectric plant) reached their respective COD, providing an additional 1,177 MW of installed capacity to the Peruvian market. As of and for
the year ended December 31, 2016, IC Power’s operating companies in Peru, Kallpa, Samay I and CDA had an installed capacity of 2,240 MW, representing 9% of Peru’s installed capacity, and
generated 12% of the gross energy generated (in GWh) in Peru. IC Power’s Peruvian business represented 157% of IC Power’s net income, 45% of its Adjusted EBITDA, and 56% of its installed
capacity as of and for the year ended December 31, 2016.

69

 
 
 
 
 
 
 
IC Power also operates OPC-Rotem, the first IPP in Israel, which, in 2013 following decades of state control, opened its electricity market to private power producers. As a result, the electricity

market in Israel is still in the early stages of development. Israel’s energy consumption levels have increased in recent years and are expected to continue to increase in the near-term. As of and for the
year ended December 31, 2016, OPC-Rotem had an installed capacity of 440 MW, representing approximately 3% of Israel’s installed capacity and 14% of the installed capacity of IPPs (excluding
renewables), and generated 5% of the gross energy generated (in GWh) in Israel. As of and for the year ended December 31, 2016, OPC-Rotem represented 114% of IC Power’s net income, 15% of its
Adjusted EBITDA, and 11% of its installed capacity. We believe that OPC-Rotem’s plant provides IC Power with a strategic advantage as an early entrant to the Israeli electricity market. Additionally,
given Israel’s growing economy and the advanced age of its existing state-owned power generation facilities, we believe OPC-Rotem provides IC Power with the know-how and visibility to pursue
additional power project opportunities in Israel, such as the acquisition and development of OPC-Hadera, which opportunities may become increasingly available to private sector participants such as IC
Power.

In addition to its attractive positions in Peru and Israel, IC Power has also developed an attractive footprint in several markets in Latin America, including Chile, and has development offices in

Mexico and Argentina. We believe that IC Power’s current platform, coupled with its agile and disciplined decision-making process, enables it to take advantage of opportunities as they arise.

Established and disciplined track record in acquiring generation assets— IC Power has acquired numerous generation assets since 2007, resulting in the expansion of its operations by 817

MW in Israel and five countries in Latin America. We believe IC Power’s recognition as a regional generator and developer with a relatively strong balance sheet, and its ability to act quickly with
respect to acquisitions has complemented IC Power’s development capabilities by allowing it to strategically source and execute acquisitions. Furthermore, IC Power’s positioning as a mid-sized
regional market participant allows IC Power to manage projects that are too small for large companies, as well as projects that are too large for small companies. Such acquisitions facilitate IC Power’s
entry into new markets and allow IC Power to act as a consolidator in the countries in which IC Power already operates.

Platform for growth in electricity distribution sector through acquisition of Energuate —In January 2016, IC Power further expanded and diversified its portfolio by completing its acquisition
of Energuate, which operates distribution companies in Guatemala, a country with a historically stable electricity sector framework. IC Power’s purchase of Energuate marks IC Power’s initial entry into
electricity distribution and IC Power believes this purchase will provide it with a platform to further expand its distribution portfolio. As of December 31, 2016, Energuate provided electric service to
approximately 1.7 million regulated customers in Guatemala (representing approximately 54% of Guatemala’s regulated distribution customers in 2016) and distributes energy to a service area of
approximately 100,000 km 2 in Guatemala, covering primarily rural areas with a population of approximately 12 million inhabitants. Energuate, the largest distribution company in Central America
(according to population served), operates approximately 70,000 km of distribution lines within Guatemala (representing approximately 83% of Guatemala’s distribution lines) as of December 31, 2016.
IC Power expects that Energuate’s sizeable distribution base and limited exposure to fluctuations in the cost of electricity (both as a result of Energuate’s entry into PPAs and a compensation framework
anchored on predefined distribution tariffs) will provide IC Power with predictable cash flows from its operations, which IC Power believes will contribute significantly to its further expansion within the
distribution industry. IC Power has created a new corporate platform with highly experienced executives from the Latin American distribution sector to manage IC Power’s distribution business. We
believe that this will provide IC Power with the required organizational support to operate Energuate, as well as a strong platform for future expansion in the distribution business in the region.

Driving operational excellence through partnerships with leading OEMs and reliance on efficient technologies —IC Power seeks to optimize its power generation capacity by using leading

technologies ( e.g. , turbines manufactured by Siemens, General Electric, Mitsubishi and Andritz) and entering into long-term service agreements with leading, multi-national OEMs. IC Power’s
technologies and long-term partnerships enable its power generation assets to perform more efficiently and at relatively high levels of reliability. Additionally, its experienced staff is committed to
increasing IC Power’s operating performance and ensuring the disciplined maintenance of its power generation assets. IC Power believes that its generation plants’ weighted average availability rate of
83% for the year ended December 31, 2016 was the result of its optimization efforts and IC Power’s commitment to improving its operating efficiency and performance.

Additionally, IC Power’s acquisition or construction of power generation assets that use efficient technologies ( e.g ., the conversion of Kallpa’s facility into a combined cycle operation in

2012) places its generation assets competitively in the dispatch merit order in certain of the countries in which IC Power operates. For example, Kallpa’s facility, a base load plant and combined cycle
gas turbine, is among the first power plants to be dispatched, due to its efficiency and competitiveness in the dispatch stack. Similarly, CDA’s hydroelectric power plant, which reached COD in August
2016, is also among the first power plants to be dispatched in Peru. Having a portfolio which includes efficient power plants with lower production costs allows IC Power to potentially earn higher
margins than companies that utilize certain other competing technologies in their plants and are therefore less competitive in the dispatch merit order.

Experienced management team with strong local presence —IC Power’s management team has extensive experience in the power generation business. Its executive officers have an average

of approximately 20 years of experience in the power generation industry, and significant portions of IC Power core management team have been working together in international large power
generation companies since 1996. We believe that this overall level of experience contributes to IC Power’s ability to effectively manage its existing operating companies and to identify, evaluate and
integrate high-quality growth opportunities within and outside Latin America. Furthermore, its hands-on management team utilizes a lean decision-making process, which allows IC Power to quickly
take advantage of strategic acquisitions and potential developments and opportunities as they materialize. IC Power’s managers are compensated, in part, on the basis of IC Power’s financial
performance, which incentivizes them to continue to improve the operating results. Additionally, IC Power’s local management teams provide in-depth market knowledge and power industry experience.
These teams consist primarily of local executives with significant experience in the local energy industry and with local government regulators. We believe that the market-specific experience of IC
Power’s local management provides IC Power with insight into the local regulatory, political and business environment in each of the countries in which it operates.

70

 
 
 
 
 
 
 
In addition, in connection with its acquisition of Energuate in January 2016, IC Power recruited an experienced management team for IC Power’s distribution business. This management team
consists of officers, some of whom were previously employed at Energuate, who work directly with IC Power’s management team to oversee and manage the Energuate business with IC Power, as well
as local executives who manage Energuate’s day-to-day operations. Additionally, this management team has extensive experience managing large distribution companies in various countries throughout
Central and South America, including Guatemala.

IC Power’s Strategies

Continue to successfully develop greenfield assets in attractive markets —One of IC Power’s core competencies is identifying, evaluating, constructing, and operating greenfield development

projects in its target markets. IC Power will continue to seek to develop power generation assets in countries with relatively stable, growing economies, low levels of per capita energy consumption or
developing private energy generation markets. IC Power also seeks to develop assets that can be expanded through further investment, or as additional fuels become available, which provides it with the
ability to further develop an asset and increase its installed capacity in connection with market trends, industry developments, or changing fuel availability.

IC Power places particular focus on its ability to complete the development of its greenfield projects on time and within budget and will continue to use extensive project planning and
contracting mechanisms to minimize its development risk. For example, in connection with its development activities, IC Power typically enters into lump-sum, turnkey EPC contracts to minimize its
construction risks and mitigate construction cost overruns, while also entering into long-term PPAs to generate stable and predictable margins and cash flows; we believe this combination facilitates IC
Power’s access to long-term construction financing. Engaging in such practices has allowed IC Power to successfully complete several thermal generation projects, including the conversion of the Kallpa
facility into combined-cycle turbines, which added an additional 292 MW to the facility’s capacity, and IC Power’s development of the Samay I 632 MW cold-reserve thermoelectric plant. Additionally,
IC Power’s first hydroelectric development, CDA’s plant, is fully operational at a cost of $1.8 million per MW, making CDA’s plant among the most efficiently constructed hydroelectric facilities in
Latin America in terms of cost per MW.

Optimize portfolio to maximize returns while minimizing risk —IC Power regularly assesses its portfolio of operating companies and employs disciplined portfolio management principles to

optimize its operations in light of changing industry dynamics in a particular country or region, create financing flexibility and address specific risk management and exposure concerns. IC Power’s
strategy is to optimize the composition of its portfolio by focusing on profitable developments and acquisitions within key power generation markets typically in Latin America, the Caribbean and Israel.

For example, prior to IC Power’s 2014 acquisition of the Las Flores facility, a 193 MW thermal power generation plant (representing 145 MW on a proportionate basis), Las Flores had operated

intermittently due to the lack of a long-term regular supply of natural gas. The Kallpa facility, which is located near the Las Flores plant, had an excess supply of natural gas. IC Power identified these
and other potential synergies and, since its acquisition of the Las Flores facility, has been able to significantly improve the operations and generation activities of Las Flores’ plant, while also maximizing
the use of the Kallpa facility’s natural gas supply and transportation capabilities. IC Power’s acquisition of Puerto Quetzal serves as another example of the portfolio optimization efforts. In addition to
providing IC Power with an attractive entry point into the Guatemalan market, one of the barges it acquired from Puerto Quetzal was redeployed to Panama to allow Kanan to take advantage of a short-
term supply shortfall in the Panamanian power market.

Additionally, in 2014, IC Power divested its 21% indirect equity interest in Enel Generación Perú, one of Peru’s largest power generation companies. While the Enel Generación Perú
investment was a strong cash flow generator which helped to fund the initial stages of IC Power’s growth, it opted to sell this investment in order to redeploy the proceeds from such sale into projects in
which it has have a majority control and which it believes will have a better risk and return profile for its shareholders over the long-term. IC Power continues to assess opportunities to optimize its
portfolio of businesses to maximize shareholder returns, which strategy may include selling interests in certain of its assets.

Complement IC Power’s organic development with dynamic and disciplined acquisitions —IC Power seeks to invest in countries and/or assets where it can significantly increase its cash

flows and optimize its operations. Therefore, in addition to greenfield developments, IC Power also seeks to enter into and/or expand its presence in attractive markets by acquiring controlling interests
in operating assets to anchor IC Power’s geographical expansion. For example, IC Power acquired power generation assets in Nicaragua, Guatemala and Colombia, which represent its initial entry into
these markets, through acquisitions of (1) ICPNH, which provided IC Power with controlling interests in two HFO and two wind energy Nicaraguan generation companies, (2) Puerto Quetzal, which
provided IC Power with three power barges with HFO generators (one of which was transferred to IC Power’s subsidiary Kanan to allow it to take advantage of supply shortfalls in the Panamanian
power market), and (3) Surpetroil, a company that utilizes stranded natural gas reserves in its production of energy. Additionally, consistent with its strategy of maintaining controlling interests in its
power generation assets, in May 2014, IC Power increased its equity ownership in JPPC (which has an aggregate 60 MW of installed capacity in two HFO generation units in Jamaica) from 16% to
100%, and in January 2015, IC Power increased its equity ownership in Nejapa (which has 140 MW of installed capacity at an HFO power generation facility in El Salvador) from 71% to 100%. IC
Power will continue to seek to leverage its acquisitions of assets in new markets and/or of assets utilizing a broad range of technologies (which may include new fuels, such as solar power) to generate
attractive risk-adjusted returns.

71

 
 
 
 
 
 
 
 
Continue to expand and optimize IC Power’s operations within the electricity distribution sector —IC Power’s acquisition of Energuate represents IC Power’s initial entry into the electricity

distribution business. IC Power intends to further expand its portfolio and diversify its revenue streams by applying its disciplined acquisition principles as it seeks to purchase additional distribution
assets in countries where IC Power believes it can significantly increase its cash flows, optimize its operations, and leverage the experience gained from its acquisition of Energuate. Additionally, IC
Power will endeavor to optimize Energuate’s existing distribution operations by targeting Energuate’s electricity losses (both commercial and technical) in the near- to medium-term. Energuate’s
management intends to reduce commercial losses (e.g., losses from illegal connections, fraud and billing errors) through improving customer billing practices to increase collection rates, increasing
targeted inspections and meter replacements, implementing a communication program with local communities and modernizing Energuate’s facilities to reduce tampering, especially in areas where
electricity theft has been more prevalent, and reduce technical losses (i.e., losses occurring in the ordinary course of electricity distribution) by investing in the modernization of Energuate’s transmission
grid and distribution system. To this end, IC Power has invested $28 million in capital expenditures relating to Energuate in the year ended December 31, 2016, and IC Power expects that its capital
expenditures relating to Energuate will increase in the coming years.

Continue to enter into long-term PPAs with credit-worthy counterparties —In the year ended December 31, 2016, IC Power made 90% of its aggregate energy sales (in GWh) pursuant to

long-term PPAs, many of which are denominated in, or linked to, the U.S. Dollar. IC Power’s strategy of generating strong and predictable cash flows from long-term PPAs has enabled it to successfully
secure financing for its greenfield projects from a diverse international lender base to fund its development and construction projects. IC Power’s generation companies seek to enter into long-term
capacity PPAs prior to committing to a new project so as to predict expected cash flows and margins of a particular asset, which facilitates its financing. For example, CDA, which reached COD in
August 2016, has sourced and entered into three long-term PPAs beginning in 2016, 2018 and 2022 for a significant portion of its expected capacity, contracting most of the estimated firm energy it
expects to generate between 2018 and 2027. As of December 31, 2016, the weighted average remaining life of CDA’s PPAs based on firm capacity was 12 years. The expected cash flows associated
with such PPAs contributed to CDA’s attractive credit profile, which supported the financing of the CDA plant’s development. Similarly, prior to IC Power’s completion of the Samay I project, the
Peruvian government guaranteed capacity payments for 600 MW for a 20-year period at rates above regulated capacity rates, which also provided support for the financing of the plant’s development. IC
Power also continues to seek to enter into, or renew, long-term PPAs for its currently operating generation assets. For example, Kallpa entered into two PPAs with Southern Peru Copper Corporation, a
10-year PPA for 120 MW and a 10-year PPA for 70 to 85 MW, both starting in 2017. In addition to significantly improving IC Power’s access to financing with no or limited recourse to IC Power, its
strategy of contracting its assets’ energy and capacity significantly reduces IC Power’s exposure to changes in spot prices.

Industry Overview

Overview of Electricity Generation Industry

IC Power’s generation businesses operate in power utility markets in Latin America, Israel and the Caribbean, each of which are governed by different degrees of regulation and regulatory
systems (as further explained below) and provide varying degrees of incentives for private investment. These markets are typically characterized by relatively high rates of growth of GDP and lower
overall and per capita energy consumption, as compared with more developed markets.

In the Latin American and Caribbean markets that IC Power serves, the power utility market regulation generally allows for the sale and delivery of power from power generators (private or

state-owned) to distribution companies (private or state-owned) and to non-regulated customers. Israel, another market that IC Power serves, has recently undergone significant structural changes. Until
July 2013, when OPC-Rotem reached COD as the first IPP in Israel, IEC, a state-owned entity, operated as the sole large-scale provider of electricity in the country. Since then, other IPPs have begun
operating in Israel and several other IPPs are expected to enter this market.

In the countries in which IC Power’s generation businesses operate, there is typically structural segregation between the companies involved in power generation and the companies involved in

power transmission and distribution. In most of these countries, the government operates the power grid, and transmission services are provided on an open access basis ( i.e. the transmission company
must transmit power through the grid, and in exchange, the transmission company charges a transmission rate set by the supervisory authority or resulting from a competitive process). In the markets
where private and state-owned entities compete in the power generation sector, transmission and distribution services are conducted subject to exclusive franchises, effectively regulating the transmission
and distribution operations.

72

 
 
 
 
 
 
 
Although operating permits are required in each of the countries in which IC Power operates, the markets in these countries generally have no material regulatory barriers to entry. The financial

resources required to enter these markets and the significant costs associated with the construction of power facilities, however, pose barriers to entry.

The following discussion sets forth a brief description of the key electricity generation markets in which IC Power’s generation companies operate.

Peru

The power utility market in Peru is currently IC Power’s primary market of operation and, driven by the growth in GDP and the expansion of energy coverage, Peruvian energy consumption

has grown in recent years. According to the Peruvian National Institute of Statistics and Informatics ( Instituto Nacional de Estadística e Informática—INEI ), Peru had a population of
approximately 31 million as of December 31, 2016. Peruvian GDP grew by 3.7%, 3.3% and 2.4% in 2016, 2015 and 2014, respectively. An increase in domestic demand, resulting from growth in the
overall economic activity of Peru, an increase in the population’s income and consumption and an increase in investment in infrastructure, has also led to an increase in investments in value-added
manufacturing processes to create products to serve the domestic market and for export. In addition, the availability and extraction of natural resources, in particular metals, has led to increased energy-
intensive mining activity, which, according to the Ministry of Energy and Mines of Peru ( Ministerio de Energía y Minas ), or MINEM, has supported the increase in Peru’s energy consumption from
29,492 GWh in 2010 to 39,509 GWh in 2015, representing a CAGR of 6%. Nonetheless, the generation capacity in Peru is expected to increase at a faster rate than the demand for such electricity,
resulting in a temporary oversupply of capacity in the Peruvian market, which may result in downward pressure on negotiated and spot energy and capacity prices in Peru in the short- to medium-term.

Spot prices in the Peruvian electricity market have recently experienced historically low levels primarily due to a sustained increase in installed capacity. A moderate demand growth, coupled

with the increase in installed capacity has increased the reserve margin in Peru from 29.9% in 2011 to 59.1% in 2016 after CDA, Samay I, and other projects reached COD]. However, according to the
COES, demand is expected to increase as a result of large mining and industrial projects such as Toquepala, Tambomayo and Shouxin, among others, as well as sustained growth in underlying demand.
As a result, the COES expects the maximum demand to grow at a 6% CAGR between 2017 and 2020.

Total firm capacity is expected to increase at a 1.9% CAGR between 2017 and 2020. According to the COES, this additional increase in supply, coupled with demand growth, is expected to
apply downward pressure to the reserve margin. The COES expects the reserve margin to reach 33.1% in 2020 (a decrease of 36%, as compared to the expected reserve margin in 2017). These factors
may have implications for spot prices in the medium-term and may provide the conditions for an improvement in future PPA prices.

The following chart presents a breakdown of installed capacity in Peru based on generation technology and fuel source, as of December 31, 2016:

Installed Capacity by Generation Technology

Installed Capacity by Fuel Source

73

 
 
 
 
 
 
 
  
  
 
 
The power utility market in Peru has experienced significant changes in the past 20 years, as a result of privatizations following structural reforms initiated in 1992. In that context, the

Peruvian power industry underwent a structural reform characterized by: (1) the enactment of a new regulatory model under the Electricity Concessions’ Law ( Ley de Concesiones Eléctricas ), or Law
25844; (2) the restructuring and reorganization of the vertically integrated state owned power utilities into non vertically integrated generation, transmission and distribution companies; (3) the
privatization of most of the state owned utilities; (4) the promotion of private investment; (4) the regulation of the remuneration model for distribution and transmission activities based on cost-efficient
standards; (5) the creation of an “open access” principle for the use of transmission and distribution networks; (6) the creation of a compensation system between generators that operates independently
from contractual arrangements; and (7) the segmentation of power consumers as “regulated” and “non-regulated,” the latter being entitled to directly contract the supply of electricity from generators.
From a regulatory perspective, the Peruvian system has split the regulatory roles among (1) an independent regulator, OSINERGMIN, (2) a policy body, the MINEM, and (3) a market operator that is a
private entity, the Committee for the Economic Operation of the System ( Comité de Operación Económica del Sistema Interconectado Nacional ), or the COES. The structure and its separation have
remained constant since the start of the reforms in 1992 and the economic model (i.e., marginal cost system) upon which the reform has been built is effectively embedded in the general electricity laws
of Peru, providing long-term economic stability for investment.

The Law to Ensure Effective Development of Power Generation ( Ley para Asegurar el Desarrollo Eficiente de la Generación Eléctrica ), or Law 28832, published on July 23, 2006, and

together with Law 25844, published on November 1992, introduced further changes to the power utility market and strengthened the model, mainly aiming to: (1) maintain the economic principles used
in Law 25844 and add new measures to facilitate competition in the wholesale market; (2) reduce government intervention in establishing power generation tariffs; (3) allow power generation tariffs for
regulated power consumers to reflect a competitive market, facilitating the construction of new generation plants when required; and (4) ensure a sufficient supply of power by reducing the power
system’s exposure to the risks of high prices and rationing inherent to situations of undersupply of natural gas or transportation congestion. Law 28832 was approved as a consequence of a severe crisis
in the Peruvian electricity market that resulted from, among other causes, OSINERGMIN defining the tariff at which distribution companies purchased electricity to supply to regulated customers at
levels that did not reflect market conditions and were not attractive for generators to sell to distribution companies. The changes introduced by this law strengthened the model and incorporated
mechanisms to effectively transfer risks from generators to end users that were not contemplated when the reforms were approved in 1992.

The reforms of 1992, together with the Peruvian Constitution of 1993, liberalized ownership across the Peruvian electricity sector and opened it to private investment, effectively eliminating

any ownership restriction based upon nationality (except within 50 km of Peru’s international land borders, where certain restrictions apply) or otherwise. The privatization and concession award process
was structured based upon the need to attract foreign investment and expertise that the country lacked. As a result of such ownership rules, the majority shareholders of almost all the private companies
acting in the Peruvian electricity market are controlled by foreign investors. The second largest investors in the electricity sector are the Peruvian private pension funds administrated by the Private
Pension Funds Administrators.

Since 1992, the Peruvian market has been operating based upon a marginal generation cost system. This system is embedded in the general electricity laws of Peru and is administrated by the

COES. In such capacity the COES has as its main mandate the satisfaction of all the demand for electricity at any given time (i.e., periods of 15 minutes each) with the most efficient generation assets
available at such time, independently of contractual arrangements between generators and their clients. For this purpose, the COES determines which generation facilities will be in operation at any given
time with an objective of minimizing the overall system energy cost. Energy units are dispatched (i.e., ordered by the COES to inject energy into the system) on a real-time basis; units with lower
variable generation costs are dispatched first and then other less efficient generation units will be dispatched, until the electricity demand is satisfied.

74

 
 
 
 
The variable cost for the most expensive generation unit dispatched in each 15-minute time period determines the price of electricity in such time period for those generation companies that
sell or buy power on the spot market price during such time period. The COES determines, for each such 15-minute period, the spot market at which such transactions among generators take place and
acts as a clearinghouse of all such transactions.

Generation companies in the Peruvian electricity market sell their capacity and energy under PPAs or in the spot market. The principal consumers under PPAs are distribution companies and

non-regulated customers. Under regulations governing the Peruvian power sector, customers with a capacity demand above 2,500 kW participate in the non-regulated power market and can enter into
PPAs directly with generation companies at freely-negotiated prices. Customers with a capacity demand between 200 kW and 2,500 kW may choose to participate in the non-regulated power market or
contract as a regulated client with a distribution company. PPAs to sell capacity and energy to distribution companies for resale to regulated customers must be made at fixed prices based on public bids
received by the distribution companies from generation companies or at the applicable bus bar tariff set by the OSINERGMIN. Generation companies are authorized to buy and sell capacity and energy
in the spot market to cover their needs and their commitments under their PPAs. Customers that are entitled to participate in the non-regulated power market must enter into PPAs with generation or
distribution companies covering all their electricity demand as they are not allowed to purchase energy or capacity directly in the spot market.

Within Peru, power is generally generated by hydroelectric or thermal power stations, including those power stations that use natural gas as fuel. The power generated by these power stations

varies in accordance with the rainy seasons and rainfall patterns in each year. For example, greater amounts of hydroelectric power are dispatched between November and April in Peru – the Peruvian
rainy season – than between May and October, when the volume of rainfall declines and operators have less water available for electricity generation in the reservoirs serving their plants. During periods
of drought, thermal plants are used more frequently. During periods of excessive rainfall when hydroelectric plants increase their generation, there may be a reduction in the spot market prices in the
system and also a reduced dispatch of thermal power plants. Accordingly, revenues within the Peruvian generation industry are generally subject to seasonality and the effects of rainfall. Although
generators in Peru act to reduce this exposure to seasonality by contracting long-term PPAs, this effect cannot be completely neutralized. For further information on the impact of seasonality on IC
Power’s operations, see “ —IC Power’s Description of Operations—Seasonality .”

For further information on Peru’s regulatory environment, see “ IC Power’s Description of Operations—Regulatory, Environmental and Compliance Matters—Regulation of the Peruvian

Electricity Sector. ”

The following table sets forth a summary of energy sales in the Peruvian market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Energy Sales
Under PPAs

Distribution

Non-regulated  

(GWh)

18,961 
19,880 
20,663 
21,988 
23,924 

14,661 
15,841 
16,465 
17,521 
19,064 

The demand for power and electricity in Peru is served by a variety of generation companies, including IC Power’s subsidiary Kallpa, Enel Generación Perú, a subsidiary of Enel, Electroperú,

a state-owned generation company whose primary generation facilities are hydroelectric plants, Engie Energía Perú S.A. (formerly EnerSur S.A.), and Orazul Energy Egenor (formerly known as Duke
Energy Egenor).

75

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth a summary of the principal generation companies in Peru, indicating their capacity by type of generation, as of December 31, 2016:

Capacity as of December 31, 2016

Combined 
Cycle- 
Natural 
Gas

Open- 
Cycle 
Natural 
Gas

Hydro

254 
787 
— 
545 
— 
898 

2,205 

4,689 

920 
479 
870 
— 
— 
— 

565 

— 
292 
193 
— 
— 
— 

530 

2,834 

1,015 

Engie Energía Perú
S.A. (formerly
EnerSur S.A.) 

Edegel 1 
Kallpa 
CDA 2 
Samay I 
Electroperú 
Other generation
companies 

Total 

(MW)

— 
230 
— 
— 
— 
— 

— 

230 

Dual Fuel

HFO

Coal

Other

Total

Percentage 
of Installed 
Capacity
(%)

1,214 
189 
— 
— 
632 
16 

574 

2,624 

142 
— 
— 
— 
— 
— 

— 

142 

— 
— 
— 
— 
— 
— 

575 

575 

2,530 
1,977 
1,063 
545 
632 
914 

4,449 

21 
16 
9 
5 
5 
8 

36 

12,110 

100 

_______________________ 
1 Includes Enel Generación Perú SAA, Enel Piura SA and Chinango SAC.
2 In March 2017, following the completion of CDA’s acceptance tests, COES, the Peruvian system operator, declared that the installed capacity of CDA had tested at 545 MW.

Israel

According to the Israel Central Bureau of Statistics, Israel had a population of approximately 8 million as of December 31, 2016. Israeli GDP grew by 2.8%, 2.6% and 2.8% in 2016, 2015 and

2014, respectively. Demand for electric power has increased in Israel in recent years due to, among other reasons, population growth, higher living standards and climate change.

Israel’s power generation units utilize fossil fuels almost exclusively. As of December 31, 2016, the installed capacity in Israel was approximately 16,543 MW, of which 10,634 MW was

fueled by natural gas based upon information available from IEC’s financial report for 2014 and the EA.  

Until July 2013, the state-owned IEC operated as the sole large-scale provider of electricity in Israel. However, PUAE (which was replaced by the EA in January 2016) incentives have

encouraged private investments in the Israeli power generation market and OPC-Rotem and other IPPs now operate in the market with significant capacity. For example, in May 2014, Dorad Energy
Ltd., or Dorad, became the second IPP to reach COD in Israel, adding capacity of 860 MW to the Israeli power market. In July 2015, the first of two units of the power plant of Dalia Power Energies
Ltd., or Dalia, reached its COD. In September 2015, the second unit reached its COD, adding, together with the first unit, 910 MW to the Israeli power market. Other IPPs are in the process of
constructing power plants, and are expected to reach their COD in the coming years.

As of December 31, 2016, OPC-Rotem had installed capacity of 440 MW, representing approximately 3% of Israel’s installed capacity and 14% of the installed capacity of IPPs (excluding

self-generators), which had an aggregate installed capacity of approximately 3,060 MW as of December 31, 2016, according to the EA.

Sales of IPPs are generally made on the basis of PPAs for the sale of energy to customers, with prices predominantly linked to the tariff issued by the EA and denominated in New Israeli

Shekels. The EA operates a “Time of Use” tariff, which provides different energy rates for different seasons ( e.g. , summer and winter) and different periods of time during the day. Within Israel, the
price of energy varies by season and demand period, with tariffs varying based upon the season—summer (July, August), winter (January, February, December) and transition (March-June, September-
November)—and demand (peak, shoulder and off-peak). Generally, the tariffs in the winter and summer seasons are higher than those in the transition season, making Israeli power generators, including
OPC-Rotem, more profitable, generally, in the winter and summer months, as compared to other months of the year.

76

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following tables set forth the tariffs and consumption blocks for each of the seasons set forth below, as of January 2017:

Winter

Regulated “Generation Component” Tariff
Transition
(NIS per MWh)

Summer

Peak 
Shoulder 
Off-Peak 
Weighted tariff 

Peak 
Shoulder 
Off-Peak 
______________________
1. The hours per consumption block may vary due to changes in the dates of weekdays, weekends and public holidays.

663 
380 
196 

276 
214 
168 
264 

Winter

Hours per Consumption Block 1
Transition
(Hours)

Summer

410 
206 
1,544 

1,932 
946 
2,234 

696 
267 
165 

315 
315 
858 

For information on the risks associated with the indexation of OPC-Rotem’s revenues and cost of sales to the EA’s generation component tariff and its potential impact on OPC-Rotem’s

business, financial condition and results of operations, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—The profitability of IPPs in Israel may be adversely affected by
changes in Israel’s regulatory costs and EA tariffs .”

The following table sets forth a summary of energy sales in the Israeli market for the periods presented:

Year Ended December 31,

Energy Sales

2011 
2012 
2013 
2014 
2015 

Distribution
(GWh)

53,100 
57,900 
56,900 
58,296 
60,376 

IEC has been classified by the Electricity Sector Law as an “essential service provider” and, as such, is subject to basic obligations concerning the proper management of the Israeli power

utility market. These obligations include the filing of development plans, management of Israel’s power system, management of Israel’s power transmission and distribution systems, provision of backup
and infrastructure services to IPPs and consumers, and the purchase of power from IPPs. IEC also transmits all of the electricity in Israel.

For further information on Israel’s regulatory environment, see “ —IC Power’s Description of Operations—Regulatory, Environmental and Compliance Matters—Regulation of the Israeli

Electricity Sector .” For information on the risks related to changes in Israel’s regulatory environment, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—The profitability
of IPPs in Israel may be adversely affected by changes in Israel’s regulatory costs and EA tariffs. ”

Nicaragua

According to the World Bank, Nicaragua had a population of approximately 6 million as of December 31, 2016. Nicaraguan GDP grew by an estimated 4.5%, 4.9% and 4.0% in 2016, 2015

and 2014, respectively.

Nicaragua’s interconnected power system had an installed capacity of approximately 1,244 MW, consisting of thermal, wind, hydroelectric, geothermal and biomass power stations using HFO

or diesel, which accounted for 55%, 15%, 11%, 11% and 8%, respectively, of Nicaragua’s capacity as of December 31, 2016 according to the National Dispatch Committee of Nicaragua ( Centro
Nacional de Despacho de Carga ), or CNDC. Nicaragua is part of the SIEPAC, thereby permitting the creation of a Central American wholesale power generation market. For information on
Nicaragua’s regulatory environment, see “ —IC Power’s Description of Operations—Regulatory, Environmental and Compliance Matters—Regulation of the Nicaraguan Electricity Sector. ”

77

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
   
 
   
 
   
 
 
 
 
 
 
The following table sets forth a summary of capacity and energy sales in the Nicaraguan market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Guatemala

Capacity Sales

Energy Sales

Under PPAs

Spot Market

Under PPAs

Spot Market

(MW)

728 
740 
749 
736 
742 

72 
72 
72 
79 
115 

(GWh)

3,536 
3,695 
3,933 
4,051 
4,202 

91 
133 
140 
185 
213 

According to the World Bank, Guatemala had a population of approximately 16 million as of December 31, 2016. Guatemalan GDP grew by 3.5%, 4.1% and 4.0% in 2016, 2015 and 2014,

respectively.

Guatemala’s interconnected power system had an installed capacity of approximately 3,398 MW, consisting of hydro, thermal and other technologies, which accounted for 38%, 57%, and 5%,

respectively, of Guatemala’s capacity as of December 31, 2016 according to the Guatemalan electricity wholesale market administrator, or AMM ( Administrador del Mercado Mayorista ).

All capacity sales in Guatemala are made pursuant to PPAs. The following table sets forth a summary of capacity and energy sales in the Guatemalan market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

El Salvador

  Capacity Sales  
Under PPAs
(MW)

1,533 
1,564 
1,635 
1,672 
1,702 

Energy Sales

Under PPAs

Spot Market

(GWh)

7,500 
7,394 
8,223 
8,984 
10,624 

1,056 
1,785 
1,899 
1,502 
790 

According to the World Bank, El Salvador had a population of approximately 6 million as of December 31, 2016. Salvadorian GDP grew by 2.5%, 2.4% and 1.4% in 2016, 2015 and 2014,

respectively.

Hydroelectric plants accounted for 34% of El Salvador’s capacity as of December 31, 2016 and geothermal plants accounted for 12%, based upon information available from the SIGET. The

remaining 54% of El Salvador’s capacity was provided by thermal plants powered by HFO, diesel and bio-mass.

The following table sets forth a summary of capacity and energy sales in the Salvadorian market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 

2016 

Panama

Capacity Sales

Energy Sales

Under PPAs

Spot Market

Under PPAs

Spot Market

(MW)

655 
715 
764 

515 
687 

332 
285 
271 

581 
398 

(GWh)

3,122 
3,823 
4,176 

3,828 
2,946 

2,761 
2,177 
1,891 

2,482 
3,405 

According to the World Bank, Panama had a population of approximately 4 million as of December 31, 2016. Panamanian GDP grew by 5.2%, 5.8%, and 6.2% in 2016, 2015 and 2014,

respectively.

78

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Panama’s interconnected power system had an installed capacity of approximately 3,221 MW, mainly consisting of hydro, thermal, coal and other technologies, which accounted for 52%,

33%, 4% and 11%, respectively, of Panama’s capacity as of December 31, 2016, according to the National Dispatch Center of Panama ( Centro Nacional de Despacho ), or CND.

The following table sets forth a summary of capacity and energy sales in the Panamanian market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Bolivia

Energy Sales

Under PPAs

Spot Market

(GWh)

7,217 
7,359 
7,542 
8,858 
10,034 

1,884 
2,615 
3,193 
2,656 
2,828 

According to the World Bank, Bolivia had a population of approximately 11 million as of December 31, 2016. Bolivian GDP grew by 3.7%, 4.8%, and 5.8% in 2016, 2015 and 2014,

respectively.

Based upon information available from the CNDC, Bolivia’s national dispatch committee, as of December 31, 2016, thermal plants fueled by natural gas and hydroelectric plants accounted

for 72% and 25% of Bolivian capacity, respectively, while other technologies accounted for 4%.

Following the nationalization of Guaracachi, Valle Hermoso and Corani in May 2010 by the Bolivian government, all of the generation companies currently developing power projects in

Bolivia are government-owned entities. It is unclear whether the Bolivian government will continue nationalizing entities involved in its power utility market and it is unclear whether such
nationalization (if any) would be adequately compensated for by the Bolivian government. For further information on the Bolivian government’s acts of nationalization, see “ Item 3.D Risk Factors—
Risks Related to IC Power’s Generation Business—The Bolivian government has nationalized energy industry assets, and IC Power’s remaining operations in Bolivia may also be nationalized .”

In December 2011, the Bolivian government amended the applicable law to prohibit generation companies from entering into new PPAs. For further information on risks related to IC Power’s

inability to renew, enter into, or replace long-term PPAs, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—IC Power’s generation companies may not be able to enter
into, or renew existing, long-term contracts for the sale of energy and capacity, contracts which reduce volatility in IC Power’s results of operations. ” For further information on Bolivia’s regulatory
environment, see “ —IC Power’s Description of Operations—   Regulatory, Environmental and Compliance Matters—Regulation of the Bolivian Electricity Sector. ”

Bolivian generation companies sell capacity and energy under PPAs or in the spot market. The following table sets forth a summary of capacity and energy sales in the Bolivian market for the

periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Capacity Sales

Energy Sales

Under PPAs

Spot Market

Under PPAs

Spot Market

Non-regulated
(MW)
43 
47 
44 
47 
42 

1,060 
1,119 
1,254 
1,317 
1,391 

Non-regulated
(GWh)
369     
368     
357     
360     
367     

6,236 
6,645 
7,121 
7,583 
8,011 

In Bolivia, wages are periodically increased by governmental decree and, as a result, labor costs, which already represent a significant portion of the operating expenses of Bolivian generation

and distribution companies, are expected to continue to increase and represent a greater portion of generation expenses.

79

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Chile

According to the World Bank, Chile had a population of approximately 8 million as of December 31, 2016. Chilean GDP grew by 1.7%, 2.3%, and 1.8% in 2016, 2015 and 2014, respectively.

Two of Chile’s four power systems represent a significant portion of its 22,412 MW electricity market. The largest of such systems is the Central Interconnected System, or the SIC, which has

a capacity of 16,837 MW, primarily consisting of hydroelectric stations, dual-fueled power stations using liquid natural gas or diesel, coal-based power stations, and wind farms and solar power stations
which accounted for 39%, 33%, 14% and 11%, respectively, of the SIC’s capacity as of December 31, 2016. The SIC serves approximately 93% of the Chilean population. The second largest power
system is the SING system, which has a capacity of 5,401 MW and serves approximately 6% of the Chilean population.

The following table sets forth a summary of capacity and energy sales in the SIC for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Dominican Republic

Capacity Sales

Energy Sales

Regulated
customers

Non regulated
customers

Regulated
customers

Non regulated
customers

(MW)

4,422 
4,765 
4,923 
4,935 
5,313 

1,967 
2,029 
2,157 
2,172 
2,443 

(GWh)

32,031 
33,511 
34,057 
34,410 
34,564 

14,251 
14,266 
14,920 
15,142 
15,893 

According to the Dominican Republic’s National Statistics Office ( Oficina Nacional de Estadística ), the Dominican Republic had a population of approximately 11 million as of December

31, 2016. The Dominican Republic’s GDP grew by 5.9%, 7.0% and 7.3% in 2016, 2015 and 2014, respectively.

Based upon information available from the OC, as of December 31, 2016, HFO plants accounted for 43.5% of the Dominican Republic’s capacity and hydroelectric plants accounted for

17.2%. The remainder of the Dominican Republic’s capacity was provided by open-cycle and combined-cycle plants fueled by natural gas, thermal plants fueled by coal, and wind plants. As of
December 31, 2016, thermal plants in the Dominican Republic had a capacity of 2,863 MW, hydroelectric plants in the Dominican Republic had a capacity of 612 MW and wind and solar plants had a
capacity of 115 MW, according to the OC.

The large-scale theft of power from the grid is prevalent in the Dominican Republic. Since generation and distribution companies do not pass through the cost associated with such theft to

consumers, the government must provide significant subsidies to these companies. For information on the Dominican Republic’s regulatory environment, see “ —IC Power’s Description of Operations—
Regulatory, Environmental and Compliance Matters—Regulation of the Dominican Republic Electricity Sector .”

Dominican Republic generation companies sell capacity and energy under PPAs or in the spot market. The following table sets forth a summary of capacity and energy sales in the Dominican

Republic market for the periods presented:

Year Ended December 31,

Distribution

Non-regulated  

Distribution

Non-regulated  

Capacity Sales

Energy Sales

Under PPAs

Other 

Spot 
Market

Under PPAs

Other 

Spot 
Market

2012 
2013 
2014 
2015 
2016 

1,429 
1,676 
1,453 
1,110 
881 

(MW)

238 
212 
163 
183 
184 

80

634 
569 
822 
1,010 
1,258 

11,084 
10,929 
10,045 
9,411 
9,166 

(GWh)

1,792 
2,164 
1,389 
1,557 
1,623 

2,657 
3,114 
4,109 
4,268 
5,359 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Jamaica

According to the World Bank, Jamaica had a population of approximately 3 million as of December 31, 2016. Jamaican GDP grew by 1.5%, 0.9%, and 0.5% in 2016, 2015 and 2014,

respectively. Jamaica’s interconnected power system had an installed capacity of approximately 1,017 MW, consisting of thermal and renewable technologies, which accounted for 86% and 14%,
respectively, of Jamaica’s capacity as of December 31, 2016, according to the Jamaica Public Service Company.

Unlike the other Latin American and Caribbean countries in which IC Power operates, or may operate in the future, Jamaica does not employ a marginal cost regulatory framework.

Generation units are dispatched based on a merit order system per their production cost. The sole distributor of electricity purchase capacity and energy from all other generation companies via PPAs.

The following table sets forth a summary of capacity and energy sales in the Jamaican market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Colombia

Capacity Sales
Under PPAs
(MW)

Energy Sales
Under PPAs
(GWh)

854     
854     
938     
935     
1,017     

4,135 
4,142 
4,107 
4,209 
4,344 

According to the World Bank, Colombia had a population of approximately 48 million as of December 31, 2016. Colombia’s GDP grew by 2.2%, 3.1% and 4.6% in 2016, 2015 and 2014,

respectively.

Colombia’s interconnected power system had an installed capacity of approximately 16,597 MW, consisting of hydro, thermal plants, cogenerators and wind, which accounted for 69.9%,

29.4%, 0.6% and 0.1%, respectively, of Colombia’s capacity as of December 31, 2016, according to the Mining and Energy Planning Unit ( Unidad de Planeación Minero Energética ), or UPME.

The following table sets forth a summary of energy sales and consumption in the Colombian market for the periods presented:

Year Ended December 31,

2012 
2013 
2014 
2015 
2016 

Overview of Electricity Distribution Market

Guatemala

Background

Energy Sales

Energy Consumption

Under PPAs

Spot Market

Regulated

  Non-regulated  

(GWh)

67,183 
71,375 
69,846 
71,549 
65,669 

17,016 
14,948 
15,544 
16,905 
20,143 

(GWh)

39,175 
40,282 
42,323 
44,629 
45,029 

19,800 
20,237 
20,867 
21,187 
20,806 

During the 1970s, the Guatemalan government was the only distributor of electricity in Guatemala through INDE and Empresa Eléctrica de Guatemala, S.A., or EEGSA. In the next two

decades, the Guatemalan electricity sector became increasingly privatized, and in 1994, the Guatemalan government adopted a new law to deregulate and privatize the Guatemalan electricity industry in
order to encourage privately funded growth. In 1996, the Guatemalan government adopted the General Electricity Law ( Ley General de Electricidad ), which created a legal and regulatory framework
designed to reduce government intervention and attract private investment into the sector.

81

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
   
 
 
 
 
 
 
   
 
 
 
 
 
 
   
 
 
 
 
 
 
   
 
 
 
 
 
 
   
 
 
   
 
 
 
   
 
 
   
 
   
 
   
 
   
 
   
 
 
 
 
 
 
 
 
 
 
Operations and regulations

Guatemalan distribution companies acquire electricity on behalf of their clients through PPAs from generation facilities, transport such electricity to their grids, and then deliver electricity

through low-voltage and medium-voltage transmission lines to regulated customers and large users and perform a range of related services such as metering, billing and management. Distribution
companies also collect tolls from large users for their use of the transmission grid.

The General Electricity Law provides that transmission companies and distribution companies must permit physical connections to the transmission and distribution systems for all customers

in exchange for a toll. Large users are entitled to receive electricity from any source and transmission and distribution companies must allow such electricity to pass through their transmission and
distribution lines. Distribution and transmission companies are entitled to collect distribution tariffs and transmission tolls for the use of their systems. Failure to provide such access by a transmission or
distribution company may lead to fines and ultimately to the termination of such company’s distribution authorization.

There are three large distribution companies authorized to distribute electricity in Guatemala: EEGSA, which predominantly serves Guatemala City, Sacatepéquez and Escuintla (urban areas),
and DEORSA and DEOCSA (which operate under the brand name “Energuate”). Guatemala has an electricity distribution market model that supports free access to any person or legal entity that fulfils
the requirements of the General Electricity Law. Authorizations for distribution services are granted on a non-exclusive basis for specific geographic areas and have terms of up to 50 years. In addition to
these large distribution companies, there are approximately 15 municipal distributors operating in the AMM.

Distribution companies are required to have PPAs in place with generation companies for the supply of sufficient electricity for the current year and the next year. Each year, the AMM
estimates the demand for each distribution company for the period from May 1 through April 30 of the following year. Each distribution company is then required to establish its own projection of
demand for the following period from May 1 through April 30. This projection of demand is then approved by the AMM and used to establish the distributor’s minimum contracting requirements. If
there is a disagreement between the AMM and the distribution companies regarding the demand estimation, the electricity regulator will decide the estimation of the demand. If the contracted capacity
and energy under a distributor’s PPAs are insufficient to meet the demand of its customers or prices under PPAs are not advantageous to a distributor, the distributor may make purchases on the spot
market, if authorized by the CNEE or permitted under the terms of certain of its PPAs. Under these PPAs, the distributor has the option of purchasing from the generator or in the spot market if the spot
market price is lower.

The industry is regulated by MEM, CNEE and AMM. The MEM is responsible for enforcing the General Electricity Law and the related regulations and for the coordination of policies

between CNEE and the AMM. The CNEE acts as the technical arm of the MEM and determines the transmission and distribution tariffs while ensuring compliance with electricity laws. The AMM is a
private entity that coordinates the operation of the generation facilities and international interconnections and transmission lines that form the Guatemalan National Electricity System. The AMM is
responsible for the safety and operation of the Guatemalan National Electricity System, performing economically efficient dispatch, and managing electricity resources in a manner that seeks to
minimize operating costs, including failure costs within restrictions imposed by the transmission system and service quality requirements.

For further information on distribution tariffs, see “ —IC Power’s Description of Operations—Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan Electricity

Distribution Market—Tariffs and Tolls .”

For further information on macroeconomic conditions in Guatemala, see “— Overview of Electricity Generation Industry—Guatemala .”

IC Power’s Description of Operations

Generation Operations

IC Power’s generation operations are focused in Latin American and Caribbean markets—primarily Peru—characterized by relatively high rates of GDP growth and relatively low base levels

of per capita energy consumption (in comparison to those of developed markets). In July 2013, IC Power commenced commercial operations in Israel, operating the first large-scale private power plant
in the country. IC Power’s portfolio includes power generation plants that operate on a range of energy sources, including natural gas, hydroelectric, HFO, diesel and wind. As of December 31, 2016, IC
Power’s installed capacity and proportionate capacity were 3,945 MW and 3,152 MW, respectively, including Samay I’s 632 MW cold-reserve thermoelectric plant in Peru, which reached COD in May
2016, CDA’s 545 MW hydroelectric plant located in Peru, which reached COD in August 2016, and Kanan’s 92 MW thermal generation project in Panama, which reached COD in April 2016.

82

 
 
 
 
 
 
 
 
 
 
 
IC Power owns, operates and develops power plants to generate and sell electricity to distribution companies and non-regulated customers under long-term PPAs and to the spot market. IC

Power’s largest generation asset is its Kallpa facility, a combined-cycle plant in Peru that includes three gas-fired generation turbines and is the largest power plant in Peru, in terms of capacity. In 2016,
90% of IC Power’s energy and capacity sales were pursuant to long-term PPAs, reducing IC Power’s exposure to fluctuating electricity and fuel prices. IC Power’s generation businesses sold 16,275
GWh of electricity during the year ended December 31, 2016; 6,996 GWh of this electricity, representing 43% of volume sold, to distribution companies, 7,586 GWh of electricity, representing 47% of
volume sold, to consumers in the non-regulated markets, and 1,693 GWh of electricity, representing 10% of volume sold, in the spot markets. During the year ended December 31, 2016, IC Power’s
operations in Peru generated 28% of IC Power’s consolidated revenues, 157% of its net income and 45% of IC Power’s Adjusted EBITDA.

The following chart sets forth the relative percentages of IC Power’s generation business’ installed capacity by energy source as of December 31, 2016:

Installed Capacity by Energy Source
(December 31, 2016) 1

IC Power’s dual-fueled assets, COBEE, OPC-Rotem, Samay I and Colmito, are categorized as hydroelectric, natural gas, diesel and natural gas, respectively.

1.
2. Does not include the 140 MW cogeneration power station which OPC-Hadera began constructing in June 2016 as a greenfield project. COD is expected by early 2019.

83

3,945 MW 2

 
 
 
 
 
The following chart sets forth the relative percentage of IC Power’s generation business’ installed capacity by segment as of December 31, 2016:

Installed Capacity by Segment
(December 31, 2016)

1. Does not include the 140 MW cogeneration power station which OPC-Hadera began constructing in June 2016 as a greenfield project. COD is expected by early 2019.

The following table sets forth summary financial information for IC Power’s subsidiaries and associate for the year ended December 31, 2016:

3,945 MW 1

Entity

GENERATION
Peru segment
Kallpa 
CDA 
Samay I 
Israel segment
OPC-Rotem 
OPC-Hadera 
Central America segment
ICPNH 4
Puerto Quetzal 
Nejapa 
Cenérgica 
Kanan 
Guatemel 
Other segment
COBEE 
Central Cardones 
Colmito 
CEPP 
JPPC 
Surpetroil 
Recsa 
Holdings 5
IC Power Distribution
Holdings 
Inkia & Other 6  
IC Power, ICPI & Other 7  
DISTRIBUTION
DEORSA 
DEOCSA 
TOTAL

Ownership 
Interest 
(%)

Sales

Cost of Sales

Net Income 
/(Loss)
($ millions)

  Adjusted EBITDA  

Outstanding Debt
2

Net Debt 3

Year Ended December 31, 2016

75 
75 
75 

80 
100 

61-65 
100 
100 
100 
100 
100 

100 
87 
100 
97 
100 
60 
100 

100 
100 
100 

93 
91 

  $

  $

438 
50 
40 

311 
45 

  $

293 
14 
16 

239 
43 

90 
55 
83 
24 
67 
7 

40 
13 
21 
29 
42 
8 
1 

— 
1 
— 

59 
52 
67 
15 
55 
4 

14 
1 
17 
24 
35 
8 
— 

— 
— 
— 

225 
284 
1,874 

  $

177 
226 
1,359 

  $

  $

  $

32 
— 
1 

24 
— 

8 
(2)  
6 
3 
(8)  
— 

9 
2 
— 
— 
(1)  
(1)  
— 

(8)  
(48)  
(31)  

19 
16 
21 

  $

  $

139 
31 
19 

65 
2 

28 
5 
12 
4 
11 
— 

20 
9 
3 
3 
4 
— 
— 

— 
(5)  
(12)  

36 
46 
420 

  $

  $

414 
593 
339 

365 
— 

88 
18 
4 
— 
46 
— 

88 
35 
17 
11 
1 
2 
5 

119 
448 
162 

125 
192 
3,072 

  $

393 
556 
321 

328 
(1)

79 
13 
3 
(1)
44 
(1)

51 
32 
16 
9 
(2)
1 
3 

119 
394 
106 

118 
183 
2,764 

1.

“Adjusted EBITDA” for each entity for the period is defined as net income (loss) before depreciation and amortization, finance expenses, net and income tax expense (benefit), excluding share in
income of associate.

84

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
Adjusted EBITDA is not recognized under IFRS or any other generally accepted accounting principles as a measure of financial performance and should not be considered as a substitute for net
income or loss, cash flow from operations or other measures of operating performance or liquidity determined in accordance with IFRS. Adjusted EBITDA is not intended to represent funds
available for dividends or other discretionary uses because those funds may be required for debt service, capital expenditures, working capital and other commitments and contingencies. Adjusted
EBITDA presents limitations that impair its use as a measure of profitability since it does not take into consideration certain costs and expenses that result from each business that could have a
significant effect on its net income, such as financial expenses, taxes, depreciation, capital expenses and other related charges.

The following tables set forth a reconciliation of net income (loss) to Adjusted EBITDA for IC Power’s generation subsidiaries for the year ended December 31, 2016:

Kallpa

CDA

Samay I

Net income (loss) 
Depreciation and amortization   
Finance expenses, net 
Income tax expense (benefit) 

  $

  $

32 
45 
37 
25 

  $

— 
7 
17 
7 

OPC-Rotem  
($ millions)

OPC-Hadera

ICPNH

  $

1 
8 
9 
1 

  $

24 
25 
16 
— 

  $

— 
2 
— 
— 

  $

8 
11 
8 
1 

Puerto 
Quetzal

Adjusted EBITDA 

  $

139 

  $

31 

  $

19 

  $

6 5 

  $

2 

  $

28 

  $

Nejapa

Cenérgica

Kanan

Guatemel
($ millions)

COBEE

Central 
Cardones

Colmito

6 
3 
— 
3 
12 

  $

  $

3 
— 
— 
1 
4 

  $

  $

CEPP

JPPC

Surpetroil

— 
3 
— 
— 
— 
3 

  $

 $

(1)   $
4 
1 
— 
— 
4 

 $

(8)   $
18 
2 
(1)  
11 

  $

(1)   $
1 
— 
— 
— 
— 

 $

  $

Net income (loss) 
Depreciation and amortization 
Finance expenses, net 
Income tax expense 
Adjusted EBITDA 

  $

  $

Net income (loss) 
Depreciation and amortization  
Finance expenses, net 
Share in income of associate 
Income tax expense (benefit) 
Adjusted EBITDA 

 $

Net income (loss) 
Depreciation and amortization 
Finance expenses, net 
Share in income of associate 
Income tax expense 
Adjusted EBITDA 

— 
— 
— 
— 
— 

  $

  $

9 
4 
4 
3 
20 

  $

  $

2 
5 
1 
1 
9 

  $

  $

IC Power 
Distribution 
Holdings

Inkia & 
Other

IC Power, ICPI 
& Other

RECSA
($ millions)

— 
— 
— 
— 
— 
— 

  $

 $

  $

 $

(8)   $
— 
8 
— 
— 
— 

 $

DEOCSA

DEORSA
($ millions)

19 
11 
9 
— 
7 
46 

  $

 $

(48)   $
13 
30 
(1)  
1 
(5)

 $

16 
8 
6 
— 
6 
36 

  $

 $

IC Power 
Total

(31)
— 
19 
— 
— 
(12)

21 
172 
171 
(1)
57 
420 

(2)
3 
2 
2 

5 

— 
1 
2 
— 
3 

Includes short-term and long-term debt and excludes loans and notes owed to a parent company.

2.
3. Net Debt is defined as total debt attributable to each of the companies, excluding debt owed to a parent company, and the cash and short term deposits and restricted cash of the relevant company.

Net Debt is not a measure recognized under IFRS. The tables below set forth a reconciliation of total debt to net debt for IC Power and its subsidiaries.

85

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Total debt 
Cash 
Net Debt 

Total debt
Cash
Net Debt

Total debt 
Cash 
Net Debt 

  Kallpa  

CDA  

Samay I  

OPC-
Rotem  

OPC-
Hadera  

ICPNH  

Puerto 
Quetzal

Nejapa

  Cenérgica  

Kanan  

  $

  $

414 
21 
393 

  $

  $

593 
37 
556 

  $

  $

339 
18 
321 

  $

  $

365 
37 
328 

  $

  $

($ millions)
— 
  $
1 
(1)   $

88 
9 
7 9 

  $

  $

18 
5 
13 

  $

  $

4 
1 
3 

  $

  $

  $

— 
1 
(1)   $

46 
2 
44 

  Guatemel

  COBEE  

Central 
Cardones  

  Colmito  

CEPP  

JPPC  

Surpetroil

Recsa

IC Power 
Distribution
Holdings  

Inkia & 
Other

  $

  $

  $

— 
1 
(1)   $

88 
37 
51 

  $

  $

35 
3 
32 

  $

  $

17 
1 
16 

  $

  $

($ millions)
  $
11 
2 
9 

  $

  $

1 
3 
(2)   $

2 
1 
1 

  $

  $

5 
2 
3 

  $

  $

119 
— 
119 

  $

  $

448 
54 
394 

IC Power, ICPI 
& Other

 $

 $

162 
56 
106 

 $

 $

DEOCSA

DEORSA

Total IC 
Power

 $

($ millions)
192 
9 
183 

 $

125 
7 
118 

 $

 $

3,072 
308 
2,764 

4. Through ICPNH, IC Power indirectly holds 65% interests in Corinto and Tipitapa Power and 61% interests in Amayo I and Amayo II.
5

In addition to the results of certain of IC Power’s generation assets, IC Power’s Other segment also includes expenses and other adjustments relating to its headquarters and intermediate holding
companies, including purchase price allocations recorded in connection with IC Power’s acquisition of Energuate, which allocations were recorded by Inkia, one of IC Power’s intermediate holding
companies.

6. Outstanding debt includes $448 million for Inkia.
7.

Includes $12 million of IC Power’s outstanding debt, $52 million of ICPI’s debt and $97 million of Overseas Investment Peru’s debt.

The following table sets forth summary financial information for IC Power’s generation subsidiaries and associates for the year ended December 31, 2015:

Ownership 
Interest 
(%)

Sales

Cost of Sales

Net Income 
/(Loss)
($ millions)

  Adjusted EBITDA  

Outstanding Debt
2

Net Debt 3

Year Ended December 31, 2015

75 

  $

448 

  $

279 

  $

43 

  $

152 

  $

416 

  $

— 
— 

318 
8 

111 
109 
100 
17 

— 

43 
14 
28 
39 
45 
8 

— 
— 

235 
7 

73 
94 
85 
13 

— 

18 
2 
25 
31 
41 
6 

(8)  
(4)  

20 
2 

17 
2 
4 
2 

— 

10 
3 
1 
3 
(2)  
(1)  

— 
— 

79 
— 

36 
10 
12 
4 

— 

21 
10 
3 
6 
2 
1 

536 
285 

383 
— 

99 
15 
6 
1 

— 

69 
44 
16 
13 
5 
3 

388 

519 
253 

255 
— 

76 
7 
(3)
(1)

(3)

50 
39 
15 
8 
1 
2 

Entity

Peru segment
Kallpa   
Assets in advance stages of
construction
CDA   
Samay I  
Israel segment
OPC-Rotem   
OPC-Hadera  
Central America segment
ICPNH 4  
Puerto Quetzal   
Nejapa  
Cenergica  
Assets in advance stages of
construction
Kanan  
Other segment
COBEE   
Central Cardones   
Colmito   
CEPP  
JPPC  
Surpetroil  
Holdings
Inkia & Other 5   
IC Power, ICPI & Other 6  
Total   

__________________________

75 
75 

80 
100 

61-65 
100 
100 
100 

100 

100 
87 
100 
97 
100 
60 

100 
100 

1 
— 
1,289 

  $

— 
— 
909 

  $

  $

(32)  
(7)  
53 

  $

(4)  
(6)  

326 

  $

565 
109 
2,565 

  $

273 
24 
1,903 

“Adjusted EBITDA” for each entity for the period is defined as income (loss) before depreciation and amortization, finance expenses, net and income tax expense (benefit).
Includes short-term and long-term debt.

1.
2.
3. Net Debt is defined as total debt attributable to each of IC Power’s subsidiaries, minus the cash and short term deposits and restricted cash of such companies. Net Debt is not a measure of liabilities

in accordance with IFRS. The tables below set forth a reconciliation of net debt to total debt for IC Power’s subsidiaries.

4. Through ICPNH, IC Power indirectly holds 65% interests in Corinto and Tipitapa Power and 61% interests in Amayo I and Amayo II.
5. Outstanding debt includes Inkia for $448 million and $117 million for ICPDH.
6.

Includes $12 million of outstanding IC Power debt and $97 million of ICPI debt.

86

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
The following tables set forth a reconciliation of income (loss) to Adjusted EBITDA for IC Power’s generation subsidiaries for the year ended December 31, 2015:

Kallpa

CDA

Samay I

OPC-Rotem  
($ millions)

  OPC- Hadera  

ICPNH

  Puerto Quetzal

Income (loss)
Depreciation and amortization
Finance expenses, net
Income tax expense (benefit)
Adjusted EBITDA

  $

  $

43    $
50     
36     
23     
152    $

(8)   $
— 
3 
5 
— 

  $

(4)   $
— 
3 
1 
— 

  $

20 
26 
26 
7 
79 

  $

  $

  $

2 
— 
(3)  
1 
— 

  $

17 
10 
9 
— 
36 

  $

  $

Income (loss)
Depreciation and amortization
Finance expenses, net
Income tax expense (benefit)
Adjusted EBITDA

Income (loss)
Depreciation and amortization
Finance expenses, net
Income tax expense (benefit)
Adjusted EBITDA

 $

 $

  $

  $

Nejapa

Cenérgica

Kanan

COBEE

  Central Cardones  

Colmito

4 
4 
— 
4 
12 

 $

 $

2 
1 
— 
1 
4 

 $

 $

 $

($ millions)
— 
— 
— 
— 
— 

 $

10 
4 
5 
2 
21 

 $

 $

3 
4 
2 
1 
10 

 $

 $

CEPP

JPPC

Surpetroil

Inkia & Other  

IC Power, ICPI &
Other

Total

  $

3 
3 
(1)  
1 
6 

  $

(2)   $
4 
1 
(1)  
2 

  $

($ millions)
(1)   $
3 
— 
(1)  
1 

  $

(32)   $
6 
20 
2 
(4)   $

(7)   $
— 
— 
1 
(6)   $

2 
3 
2 
3 
10 

1 
1 
1 
— 
3 

53 
119 
104 
50 
326 

The tables below set forth a reconciliation of net debt to total debt for IC Power’s generation subsidiaries.

Kallpa

CDA

Samay I

  OPC-Rotem  

Total debt
Cash
Net Debt

  $

  $

416    $
28   
388    $

536 
17 
519 

  $

  $

285 
32 
253 

  $

  $

383 
128 
255 

  $

  $

87

OPC
Hadera

($ millions)
— 
— 
— 

  $

  $

ICPNH

  Puerto Quetzal 

Nejapa

Cenérgica

99 
23 
76 

  $

  $

15 
8 
7 

  $

  $

  $

6 
9 
(3)   $

1 
2 
(1)

 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
   
 
 
 
 
 
 
 
 
   
   
 
 
 
 
 
 
 
   
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  Kanan  

  COBEE  

Central
Cardones  

  Colmito  

CEPP  

JPPC  

Surpetroil

Total debt  
Cash  
Net Debt   

  $

— 
3 
(3)   $

69 
19 
50 

  $

  $

44 
5 
39 

  $

  $

16 
1 
15 

  $

  $

  $

($ millions)

13 
5 
8 

  $

  $

5 
4 
1 

  $

  $

Inkia &
Other

IC Power,
ICPI &
Other

Total

3 
1 
2 

  $

  $

565 
292 
273 

  $

  $

109 
85 
24 

  $

  $

2,565 
662 
1,903 

The following table sets forth summary financial information for IC Power’s generation subsidiaries as of and for the year ended December 31, 2014:

Ownership 
Interest 
(%)

Sales

Cost of Sales

Net Income 
/(Loss)
($ millions)

Adjusted EBITDA
1

Outstanding Debt
2

Net Debt 3

Year Ended December 31, 2014

75 

  $

437 

  $

270 

  $

50 

  $

154 

  $

453 

  $

75 
75 

80 

61-65 
100 
71 
100 

100 

100 
87 
100 
97 
100 
60 
100 
100 

  $

— 
— 

413 

125 
33 
132 
18 

— 

41 
11 
38 
73 
41 
9 
1 
— 
1,372 

  $

— 
— 

252 

98 
29 
119 
14 

— 

18 
2 
36 
56 
39 
3 
— 
— 
936 

  $

(5)  
— 

71 

6 
(1)  
4 
2 

— 

9 
(1)  
— 
9 
(2)  
2 
131 
(19)  
256 

  $

— 
— 

153 

22 
3 
11 
4 

— 

19 
7 
2 
16 
1 
5 
1 
(3)  

395 

  $

444 
145 

419 

108 
32 
— 
— 

— 

85 
48 
20 
30 
8 
3 
447 
106 
2,348 

  $

428 

338 
11 

231 

92 
14 
(23)
(4)

(4)

43 
44 
19 
22 
4 
2 
262 
78 
1,557 

Entity

Peru segment
Kallpa   
Assets in advanced stages of
construction
CDA   
Samay I  
Israel segment
OPC-Rotem   
Central America segment
ICPNH 4  
Puerto Quetzal   
Nejapa  
Cenérgica  
Assets in advanced stages of
construction
Kanan  
Other
COBEE   
Central Cardones   
Colmito   
CEPP  
JPPC  
Surpetroil  
Inkia & Other 5   
IC Power, ICPI & Other 6  
Total   

__________________________

1.

“Adjusted EBITDA” for each entity for the period is defined as net income (loss) before depreciation and amortization, financing expenses, net, income tax expense (benefit) and asset write-off,
excluding share in income (loss) from associates, gain on bargain purchase, measurement to fair value of pre-existing share and net income from discontinued operations, net of tax (excluding
dividends received from discontinued operations).
Includes short-term and long-term debt.

2.
3. Net Debt is defined as total debt attributable to each of IC Power’s subsidiaries, minus the cash and short term deposits and restricted cash of such companies. Net Debt is not a measure of liabilities

in accordance with IFRS. The tables below set forth a reconciliation of net debt to total debt for IC Power’s subsidiaries.

4. Through ICPNH, IC Power indirectly holds 65% interests in Corinto and Tipitapa Power and 61% interests in Amayo I and Amayo II.
5. Outstanding debt includes Inkia for $447 million.
6.

Includes $12 million of outstanding IC Power debt and $94 million of ICPI debt.

The following tables set forth a reconciliation of net income (loss) to Adjusted EBITDA for IC Power’s generation subsidiaries for the year ended December 31, 2014:

Kallpa

CDA

Samay I

OPC-Rotem  

ICPNH

Puerto Quetzal

Net income (loss) for the year  
Depreciation and amortization   
Financing expenses, net   
Income tax expense (benefit)   
Adjusted EBITDA   

  $

  $

50 
46 
35 
23 
154 

  $

  $

(5)  
— 
— 
(5)  
— 

  $

88

($ millions)
— 
  $
— 
— 
— 
— 

  $

71 
25 
31 
26 
153 

  $

  $

6 
8 
7 
1 
22 

  $

  $

(1)
1 
1 
2 
3 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Net income (loss) for the year
Depreciation and amortization
Financing expenses, net
Income tax expense
Adjusted EBITDA

Nejapa

Cenérgica

COBEE
($ millions)

  Central Cardones  

Colmito

 $

 $

4 
5 
— 
2 
11 

 $

 $

2 
1 
— 
1 
4 

 $

 $

9 
4 
4 
2 
19 

 $

 $

(1)
4 
2 
2 
7 

 $

 $

CEPP

JPPC

Surpetroil

Inkia & Other  

IC Power, ICPI
& Other

Total

Net income (loss) for the year
Depreciation and amortization
Financing expenses, net
Income tax expense (benefit)
Asset write-off
Share in income (loss) from associates
Gain on bargain purchase
Measurement to fair value of pre-existing share
Net income from discontinued operations, net of tax, excluding

dividends received from discontinued  operations

Adjusted EBITDA

  $

  $

9 
3 
1 
3 
— 
— 
— 
— 

— 
16 

  $

  $

(2)   $
3 
1 
(1)  
— 
— 
— 
— 

— 
1 

  $

The tables below set forth a reconciliation of net debt to total debt for IC Power’s generation subsidiaries.

($ millions)

2 
1 
1 
1 
— 
— 
— 
— 

— 
5 

  $

  $

  $

131 
6 
23 
(8)  
35 
(2)  
(68)  
(3)  

(113)  
1 

  $

(19)   $
— 
12 
4 
— 
— 
— 
— 

— 
(3)   $

— 
1 
1 
— 
2 

256 
108 
119 
63 
35 
(2)
(68)
(3)

(113)
395 

  Kallpa  

CDA  

Samay I  

OPC-
Rotem  

ICPNH  

Puerto
Quetzal

  Nejapa  

  Cenérgica  

Kanan  

  COBEE  

Total debt  
Cash  
Net Debt   

Total debt
Cash  
Net Debt

  $

  $

453 
25 
428 

  $

  $

444 
106 
338 

  $

  $

145 
134 
11 

  $

  $

419 
188 
231 

  $

  $

($ millions)
  $

108 
16 
92 

  $

32 
18 
14 

  $

  $

  $

— 
23 
(23)   $

  $

— 
4 
(4)   $

  $

— 
4 
(4)   $

85 
42 
43 

Central
Cardones

Colmito

CEPP

JPPC

Surpetroil

  Inkia & Other 

IC Power,
ICPI & Other  

Total

  $

  $

48 
4 
44 

  $

  $

20 
1 
19 

  $

  $

30 
8 
22 

  $

  $

89

($ millions)

8 
4 
4 

  $

  $

3 
1 
2 

  $

  $

447 
185 
262 

  $

  $

106 
28 
78 

  $

  $

2,348 
791 
1,557 

 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth summary operational information for IC Power’s generation subsidiaries and associated company as of and for the year ended December 31, 2016:

Entity

Peru segment
Kallpa 
Samay I 
CDA 
Israel segment
OPC-Rotem 
OPC-Hadera
Central America segment
ICPNH 
Puerto Quetzal 
Nejapa 
Kanan 
Other
COBEE 
Central Cardones 
Colmito 
CEPP 
JPPC 
Surpetroil 
Pedregal 
Total 

Installed
Capacity 
(MW) 1

Proportionate 
Capacity 2

Gross 
energy 
generated 
(GWh)

Availability 
factor (%)
Operating Companies

Average heat 
rate 3

Average 
sales price 
($ per MWh) 4

Average 
fuel cost 
($ per MWh)

Year Ended December 31, 2016

1,063 
632 
545 

440 
18 

185 
179 
140 
92 

228 
153 
58 
67 
60 
31 
54 
3,945 

797 
473 
409 

352 
18 

117 
179 
140 
92 

228 
133 
58 
65 
60 
19 
11 
3,152 

6,015 
103 
693 

3,487 
102 

978 
364 
387 
169 

889 
1 
9 
264 
408 
75 
264 
14,208 

96%   
33%   
33%   

91%   
95%   

88%   
95%   
97%   
69%   

92%   
98%   
99%   
78%   
85%   
97%   
97%   

7,675 
10,240 
- 

6,759 
4,258 

5,845 
9,088 
9,621 
9,939 

13,594 
— 
9,252 
9,550 
8,166 
12,606 
8,832 

74 
426 
73 

91 
511 

95 
159 
217 
409 

47 
— 
2,625 
113 
108 
107 
134 

26 
106 
— 

37 
65 

41 
49 
65 
61 

— 
— 
125 
51 
59 
27 
50 

________________________________

1. Reflects 100% of the capacity of each of IC Power’s assets, regardless of the ownership interest in the entity that owns each such asset.
2. Reflects the proportionate capacity of each of IC Power’s assets, as determined by the ownership interest in the entity that owns each such asset.
3. Heat rate is defined as the number of Btus of energy contained in the fuel required to produce a kilowatt-hour of energy (btu/kWh) for thermal plants.
4.

Includes revenues from energy and capacity sales. Average sales prices are generally higher for IC Power’s generation businesses which generate a higher percentage of their total revenues through
capacity sales.

The following table sets forth summary operational information for IC Power’s generation subsidiaries and its associated company for the year ended December 31, 2015:

Entity

Installed Capacity
(MW) 1

Proportionate
Capacity 2

Gross energy
generated (GWh)  

Availability factor
(%)
Operating Companies

  Average heat rate  

Average sales
price ($ per MWh)
3

Average fuel cost
($ per MWh)

Year Ended December 31, 2015

Peru segment
Kallpa
Israel segment
OPC-Rotem
OPC-Hadera
Central America segment
ICPNH
Puerto Quetzal
Nejapa
Other
COBEE
Central Cardones
Colmito
CEPP
JPPC
Surpetroil
Pedregal
Total

________________________

1,063 

440 
18 

185 
179 
140 

228 
153 
58 
67 
60 
20 
54 
2,665 

797 

352 
18 

117 
179 
140 

228 
133 
58 
65 
60 
12 
11 
2,170 

5,166 

3,811 

264   

1,095 
673 
440 

1,081 
4 
27 
298 
445 
43 
356 
13,465 

97 

99 
58 

90 
94 
96 

89 
97 
99 
81 
86 
96 
94 

7,868 

6,730 
4,630 

8,926 
9,107 
9,591 

13,594 
11,241 
9,221 
9,470 
7,989 
13,829 
8,859 

57 

80 
53 

99 
113 
117 

39 
217 
95 
125 
101 
104 
107 

28 

36 
40 

51 
74 
83 

16 
229 
114 
73 
69 
38 
71 

1. Reflects 100% of the capacity of each of IC Power’s assets, regardless of the ownership interest in the entity that owns each such asset.
2. Reflects the proportionate capacity of each of IC Power’s assets, as determined by the ownership interest in the entity that owns each such asset.
3.

Includes revenues from energy and capacity sales. Average sales prices are generally higher for IC Power’s generation businesses which generate a higher percentage of their total revenues through
capacity sales.

4. Reflects gross energy generated (GWh) since IC Power acquired OPC-Hadera in August 2015.

90

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
The following table sets forth summary operational information for IC Power’s generation subsidiaries and its associated company as of and for the year ended December 31, 2014:

Installed Capacity
(MW) 2

Proportionate
Capacity 3

Gross energy
generated (GWh)  

Availability factor
(%)
Operating Companies

  Average heat rate  

Average sales
price ($ per MWh)
4

Average fuel cost
($ per MWh)

Year Ended December 31, 2014

1,063 

440 

185 
179 
140 

228 
153 
58 
67 
60 
15 
54 
2,642 

797 

352 

117 
179 
99 

228 
133 
58 
65 
60 
9 
11 
2,108 

5,920 

3,465 

1,099 
490 
376 

1,085 
— 
6 
242 
425 
48 
405 
13,561 

97 

90 

95 
97 
97 

91 
97 
95 
89 
85 
84 
93 

7,105 

6,754 

9,011 
9,182 
9,597 

13,786 
12,238 
8,521 
9,539 
8,306 
14,900 
8,800 

55 

104 

143 
126 
178 

40 

148 
227 
182 
140 
196 

24 

40 

96 
137 
158 

15 
— 
241 
146 
137 
21 
129 

Entity 1

Peru segment
Kallpa
Israel segment
OPC-Rotem
Central America segment
ICPNH
Puerto Quetzal
Nejapa
Other
COBEE
Central Cardones
Colmito
CEPP
JPPC
Surpetroil
Pedregal
Total

__________________________

1. Does not include Enel Generación Perú, which IC Power sold in September 2014.
2. Reflects 100% of the capacity of each of IC Power’s assets, regardless of IC Power’s ownership interest in the entity that owns each such asset.
3. Reflects the proportionate capacity of each of IC Power’s assets, as determined by the ownership interest in the entity that owns each such asset.
4.

Includes revenues from energy and capacity sales. Average sales prices are generally higher for IC Power’s generation businesses which generate a higher percentage of their total revenues through
capacity sales.

Peru Segment

The following summaries provide a description of the portfolio of generation assets in IC Power’s Peru segment.

Kallpa

IC Power owns 75% of Kallpa; the remaining 25% is held by Energía del Pacífico. Energía del Pacífico is a member of the Quimpac group, a Peruvian chemical company. Energía del Pacífico

also holds a 25% interest in both CDA and Samay I. Kallpa is IC Power’s largest asset and the third largest power generation company in Peru in terms of installed capacity as of December 31, 2015.
Kallpa owns and operates two power plants, including the largest power generation facility in terms of capacity in Peru, its largest market, which utilizes natural gas for its operations. The Kallpa
facility’s combined cycle plants have a capacity of 870 MW, representing approximately 7% of the total capacity in Peru, as of December 31, 2016, following the 2012 conversion of this facility’s three
natural gas-powered open-cycle generation turbines into combined cycle turbines with a 292 MW steam turbine. IC Power completed the conversion of the Kallpa facility in August 2012 at a cost of
$337 million.

The Kallpa facility’s combined-cycle plants are among the most efficient plants in Peru (by cost of operations in U.S. Dollars per MW capacity) and were among the most efficient thermal

plants in Peru in terms of heat rate in 2016, according to the COES. As a result of Kallpa’s efficiency and low cost of operations, Kallpa has a strong competitive position in the Peruvian market and is
currently the largest thermoelectric power plant in Peru (according to market share, in terms of energy dispatched by thermoelectric power plants during 2016).

In April 2014, Kallpa purchased the 193 MW single turbine natural gas-fired plant “Las Flores,” which reached its COD in May 2010 and is located in Chilca, Peru, for $114 million, increasing

Kallpa’s installed capacity from 870 MW to 1,063 MW, representing approximately 9% of the total installed capacity in Peru as of December 31, 2016. Prior to Kallpa’s acquisition of Las Flores in
2014, the Las Flores plant had operated intermittently due to the lack of a long-term regular supply of natural gas and an associated natural gas transportation contract. The Kallpa facility, which is
located near the Las Flores plant, had an excess of available gas supply, and was, therefore, in a position to significantly improve the Las Flores plant’s operations and generation activities. Since
Kallpa’s acquisition of Las Flores, Las Flores has been able to utilize Kallpa’s excess gas supply and enjoys several synergies in the use and transport of gas to its facility.

Additionally, Las Flores holds environmental permits for a future 190 MW gas-fired expansion and has sufficient space to locate such a facility, as well as a combined cycle expansion, on its

existing premises. In July 2015, Kallpa received environmental approval to convert both its existing unit and the future gas turbine in Las Flores, if developed, into a combined-cycle plant. If completed,
these expansion projects, which IC Power has not committed to initiate, would increase the capacity of Las Flores’ plant by 400 MW from 193 MW to approximately 593 MW.

91

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
Kallpa has a long-term contract for the supply of natural gas not exceeding 100% of its installed capacity. The price that Kallpa pays for its supply of natural gas is based on a base price in U.S.
Dollars set on the date of the supply agreement, indexed each year based on two producer price indices, with discounts available based on the volume of natural gas consumed. Kallpa’s PPAs are indexed
to the underlying fuel cost under the related long-term supply agreements, which generally limits Kallpa’s exposure to fuel price fluctuations, including the impact of such fluctuations on IC Power’s
margins.

During the years ended December 31, 2016, 2015 and 2014, Kallpa generated revenues of $438 million, $448 million and $437 million, respectively, representing 23%, 35% and 32% of IC

Power’s consolidated revenues, respectively. During the year ended December 31, 2016, Kallpa generated 6,015 GWh, representing 12.4% of the Peruvian interconnected system’s energy production.

In the year ended December 31, 2016, approximately 96% of Kallpa’s aggregate energy sales (in GWh) were made pursuant to PPAs. As of December 31, 2016, all of Kallpa’s PPAs were

indexed to the price of the corresponding power plant’s operating fuel prices in U.S. Dollars and provided for payment in, or were linked to, the U.S. Dollar, thereby generally limiting Kallpa’s exposure
to fuel price and exchange rate fluctuations. As of December 31, 2016, the weighted average remaining life of Kallpa’s significant PPAs based on firm capacity was seven years. Kallpa has committed to
sell more than 50% of its available energy (in MWh) in every year up to 2021.

The following table sets forth certain information regarding each of Kallpa’s turbines for each of the periods presented:

As of
December 31,
2016

Years Ended December 31,

201 6

2015

2014

Year of

Turbine

Commission   Installed Capacity  

(MW)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor 
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Kallpa I 1
Kallpa II 1
Kallpa III 1
Kallpa IV 2
Las Flores
Total
_______________________

2007
2009
2010
2012
2014

186 
195 
197 
292 
193 
1,063 

1,314 
1,109 
1,257 
2,016 
319 
6,015 

98 
84 
99 
99 
99 

954 
1,126 
1,218 
1,759 
109 
5,166 

91 
99 
99 
95 
100 

1,243 
1,266 
1,262 
2,027 
122 
5,920 

96 
97 
96 
98 
96 

1. Reflects the effective capacity of the turbine at its COD.
2. Reflects the installed capacity. Kallpa IV is the steam turbine built to convert the Kallpa plant to combined cycle, which reached its COD in August 2012.

Kallpa’s turbines are maintained according to a predefined schedule based upon the running hours of each turbine and the manufacturer specifications particular to it. Kallpa anticipates the first

maintenance of its Kallpa IV turbine to occur in 2018 or 2019. Kallpa’s maintenance schedule is coordinated with, and approved by, the COES. Kallpa is a party to a services contract with Siemens
Energy, Inc. and a supply and support contract with Siemens Power Generation, Inc., each of which provides for an 18-year term of service for each of the Kallpa I, II and III turbines, or the equivalent
of 100,000 hours of operation, beginning in March 2006, in December 2007, and in July 2008, respectively. These agreements have been amended to include Las Flores, thereby requiring the OEM to
supply spare parts, hardware and maintenance services to Las Flores during the term of the agreement. IC Power also has relationships with the OEM and Sulzer, which each periodically perform onsite
analyses and make annual recommendations regarding line maintenance. Spare parts for the Kallpa IV turbine are generally available and can be obtained from the OEM as well as from other suppliers.

Kallpa also generates revenue from ancillary services (principally transmission tolls that are typically passed through to Kallpa’s customers pursuant to its PPAs). During the years ended

December 31, 2016, 2015 and 2014, Kallpa generated revenues from ancillary services of $89 million, $88 million and $73 million, respectively, representing 20%, 20% and 17% of Kallpa’s revenues
for those years, respectively.

Through Inkia, IC Power has entered into a shareholders’ agreement, which grants protective minority rights to Energía del Pacífico, a 25% partner in Kallpa. For example, IC Power and

Energía del Pacífico have agreed that each will submit projects related to generation or transmission of energy in Peru to Kallpa and will not develop such projects other than through Kallpa, subject to
limited exceptions. For further information on IC Power’s shareholders’ agreements, see “ —Shareholders’ Agreements ” and the risks related to IC Power’s shareholders’ agreements, see “ Item 3.D
Risk Factors—Risks Related to IC Power—IC Power has granted rights to the minority shareholders of certain of its subsidiaries .”

Cerro del Aguila (CDA)

IC Power owns 75% of CDA; the remaining 25% is held by Energía del Pacífico. CDA’s plant has an installed capacity of 545 MW as at March 2017, and is the largest privately-owned

hydroelectric plant in Peru and among the largest in Latin America.

92

 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 
 
In October 2010, Kallpa entered into—and in June 2011, Kallpa transferred to CDA—a concession agreement with the Government of Peru that provides a concession, which grants Kallpa, for

an unlimited term, the right to construct and operate a run-of-the-river hydroelectric project on the Mantaro River in central Peru. The CDA plant is located 16 kilometers downstream of Peru’s largest
hydroelectric complex, formed by the Mantaro and the Restitución hydroelectric plants, with a capacity of 800 MW and 208 MW, respectively, and the Junin water reservoir, the largest in Peru. The
Mantaro plants form the largest hydroelectric complex in Peru (in terms of capacity and generation), run as a year round base load unit and has stable generation levels. The Junin water reservoir is
expected to provide a relatively constant water flow for the downstream power plants, benefiting CDA’s hydrology. CDA holds water rights granted by the National Water Authority ( ANA—Autoridad
Nacional del Agua ) in connection with the operation of the CDA plant. IC Power estimates that the CDA plant will have an average annual load factor of 70%, which is significantly above the average
(60%) for similar projects in Latin America. The CDA plant consists of a 6 kilometer head-race tunnel and a 17 kilometer transmission line.

CDA has entered into three PPAs—a 15-year PPA with Electroperú covering 200 MW of capacity and the associated energy that commences in 2016, a 10-year PPA with Luz del Sur S.A.A.,
Enel Distribución Perú S.A.A. and Edecañete S.A., covering 202 MW of capacity and the associated energy that commences in January 2018 and a 10-year PPA with Enel Distribución and Luz de Sur,
covering 81 MW that commences in January 2022—which will account for a significant portion of CDA’s expected generation capacity. Assuming a consumption factor of between approximately 0.60
and 0.70 and certain volumes of capacity, peak and off-peak sales occurring at each PPA’s average price (from the beginning of the PPA until 2020), IC Power expects CDA’s PPA with Electroperú to
generate annual revenues in the range of $81 million to $85 million per full year, CDA’s PPA with Luz del Sur S.A.A., Enel Distribución Peru S.A.A. and Edecañete S.A. to generate annual revenues in
the range of $52 million to $56 million per full year and CDA’s PPA with Enel Distribución Perú S.A.A. and Luz del Sur S.A.A. to generate annual revenues in the range of $20 million to $22 million
per full year. Kallpa has provided bank guarantees of $4 million and CDA has undertaken to provide bank guarantees of $19 million to secure obligations under the PPAs. As of December 31, 2016, the
weighted average remaining life of CDA’s PPAs based on firm capacity was 12 years. The PPA with Electroperú has an average price of $54/MWh, capacity payments of $6.4/kW-month, is
denominated in U.S. Dollars and is indexed to the U.S. producer price index. The PPA with Luz del Sur S.A.A., Enel Distribución Perú S.A.A. and Edecañete S.A. has an average price of $50/MWh,
capacity payments of $6.6/kW-month, is denominated in the Peruvian Sol, but indexed to natural gas prices in Peru, which are denominated in U.S. Dollars, and indexed to the U.S. producer price index.
The PPA with Luz del Sur S.A.A. and Enel Distribución Perú S.A.A. has an average price of $41/MWh, capacity payments of $6.5/kW-month, is denominated in the Peruvian Sol, but indexed to natural
gas prices in Peru, which are denominated in U.S. Dollars, and indexed to the U.S. producer price index. Although CDA operates a hydroelectric plant, its PPAs are indexed to natural gas prices,
exposing CDA to fluctuations in such prices.

CDA reached COD in August 2016. Prior to this, CDA did not recognize any revenues or operating income from its operations. Construction of the CDA plant is estimated to cost

approximately $959 million. The CDA plant is fully operational at a cost of $1.8 million per MW, making the CDA plant among the most efficiently constructed hydroelectric facilities in Latin America
industry in terms of cost per MW. Development of the CDA plant was financed with a $591 million syndicated credit facility, or the CDA Finance Facility, with export credit agencies, development
banks and private banks, and collateralized by the assets of the project. The remaining portion of the cost of the CDA plant has been substantially financed with equity from each of Inkia and Energía del
Pacífico. As of December 31, 2016, Inkia (through which IC Power holds interest in CDA) and Energía del Pacífico have invested $246 million and $82 million in CDA, respectively. In connection with
the CDA Finance Facility, each of Inkia and Energía del Pacífico entered into an equity contribution and retention agreement with the administrative agent under the CDA Finance Facility and agreed,
among other things, to provide contingent equity and credit support to cover cost overruns (this support obligation was limited, in Inkia’s case, to $44 million).  For further information regarding the
terms of the CDA Finance Facility, see “Item 5.B Liquidity and Capital Resources—IC Power’s Liquidity and Capital Resources—IC Power’s Material Indebtedness—CDA Finance Facility.”

In March 2017, following the completion of CDA’s acceptance tests, COES, the Peruvian system operator, declared that the installed capacity of CDA had tested at 545 MW, representing a 35

MW increase above CDA’s planned installed capacity. CDA is under discussions with the EPC contractor regarding the final reconciliation of construction costs.

In November 2011, CDA and Astaldi S.p.A. and GyM S.A., as contractors operating under the consortium name of Consorcio Río Mantaro S.A., or Río Mantaro, individually entered into a

turnkey engineering, procurement and construction contract for the construction of the CDA plant, or the CDA EPC, pursuant to which each of Astaldi S.p.A. and GyM S.A. committed, on a joint and
several basis, to construct the CDA plant by February 2016 and provide all services necessary for the design, engineering, procurement, construction, testing and commissioning of the CDA plant for
approximately $700 million, payable on a monthly basis to Río Mantaro based upon construction completed in the previous calendar month. CDA’s payments to Río Mantaro were subject to adjustments
made in accordance with the CDA EPC.

In April 2014, Astaldi S.p.A. and GyM S.A., the contractors under the CDA EPC delivered a claim to CDA, demanding a six-month extension for the completion of the construction of the CDA

plant (from early 2016 to September 2016) and an approximately $92 million increase in the total contract price of the CDA plant’s development. In March 2015, IC Power, together with the CDA EPC
contractors, amended the CDA EPC to address such claims. Pursuant to the amendment, IC Power has agreed to pay, subject to certain conditions, an additional $40 million and granted the extensions
previously requested by the CDA EPC contractors.

93

 
 
 
 
 
 
Samay I

IC Power owns 75% of Samay I; the remaining 25% is held by Energía del Pacífico. In November 2013, Samay I won a public bid auction conducted by MINEM to build a cold-reserve open-

cycle diesel and natural gas (dual-fired) thermoelectric plant in Mollendo, Arequipa in southern Peru, with an installed capacity of approximately 600 MW (when operated with diesel fuel) at an
estimated cost of $380 million. The two-bid auction, which was won by Samay I and a subsidiary of Engie, is part of an effort by the Peruvian government to promote the construction of a power node in
southern Peru, which will be fueled by natural gas once a natural gas pipeline (the Gasoducto Sur Peruano, currently under construction) delivers gas to the area. Approximately 82% of the cost of the
Samay I plant was financed with a $311 million seven-year syndicated secured loan agreement with Bank of Tokyo-Mitsubishi, Sumitomo Mitsui Banking Corporation and HSBC. The remaining 18%
was financed with equity contributions from each of Inkia and Energía del Pacífico. Samay I invested $379 million (excluding $26 million of diesel fuel inventory) into the development of its facility and
has fully drawn the $311 million Samay I Finance Facility (as defined below). For further information on the Samay I Finance Facility, see “ Item 5.B Liquidity and Capital Resources—IC Power’s
Liquidity and Capital Resources—IC Power’s Material Indebtedness——Samay I Finance Facility .”

The Samay I plant is expected to have three operational stages. In the current stage, it operates as a cold reserve plant with diesel until natural gas becomes available in the area through a

pipeline currently under construction. It is uncertain when the pipeline will be completed. In the second stage, once natural gas becomes available to the facility through the new natural gas pipeline, the
Samay I plant will have the obligation to operate as a natural gas-fired power plant and will be able to do so with minor investments by IC Power in Samay I’s facilities. When fueled by natural gas, the
Samay I plant is expected to have an installed capacity of approximately 720 MW. Finally, following an additional investment in the conversion of the Samay I plant, which IC Power has not committed
to make, the Samay I plant could operate as a combined cycle thermoelectric plant, which would increase Samay I’s installed capacity to approximately 1,080 MW. Samay I has entered into an
agreement with the State of Peru, with a term of 20 years, under which Samay I will receive fixed monthly capacity payments denominated in U.S. Dollars and IC Power will pass-through all of the
variable costs during the cold reserve phase, representing an aggregate amount of approximately $1 billion in revenues from the Samay I plant over the 20-year term of this agreement. The amount of
monthly payments required to make up the total amount to which Samay I is entitled will be calculated by the COES, and will be paid by all generators that form part of the SEIN who, in their turn
collect the corresponding fee from their customers through a surcharge in the transmission tariffs applicable to, and payable by, all end consumers. The surcharge does not involve the use of state funds
or any appropriation process, being a mechanism that has been used for almost 20 years in Peru to cover the cost of various energy projects.

In the past, access to a supply of natural gas has been a primary factor that has limited the development of new power projects in Peru. For example, the Las Flores plant operated intermittently
for four years when it did not have access to a firm supply of natural gas to support its operations. In contrast, in addition to receiving a 20-year stream of capacity payments, Samay I has an advantage in
being one of only two power generation companies that have defined rights to a natural gas supply and transportation capacity once the Gasoducto Sur Peruano is completed. The developer of such
pipeline has a contractual obligation under its concession agreement with the State of Peru to build a branch of the pipeline to connect it with the Samay I plant. IC Power’s strategic development of the
Samay I plant will provide it with a significant advantageous position in the future southern Peru power node, which will develop once the Gasoducto Sur Peruano is completed. Pursuant to the terms of
its tender, Samay I must receive gas and transportation services pursuant to terms which are similar to other power plants located in other parts of Peru and served by the existing TGP pipe line, such as
the Kallpa plant. According to Law 29970, natural gas transportation costs of the Samay I plant will be eventually subsidized by additional tariffs on the electricity transmission toll periodically
determined by OSINERGMIN with the purpose of decentralizing the generation of electricity with natural gas, which is one of the main purposes of the State of Peru developing the southern Peru power
node. Electroperú has commenced negotiations with suppliers and concessionaires for the supply and transport of natural gas to each of Samay I and the other plant with a defined right to the firm supply
of natural gas. However, as Electroperú may not be successful in obtaining an agreement which conforms to the conditions as contemplated in the tender documents of the cold reserve bidding process,
IC Power believes Samay I has the right to reject entering into any supply and transportation agreements which do not comply with the conditions set forth in its tender.

In connection with the construction of its facility, Samay I entered into three EPC contracts with the following parties: (1) Posco Engineering & Construction Co., Ltd., or Posco, and Santos

CMI Inc. (USA), for the design, construction and installation of the power station; (2) Abengoa Perú S.A. for the construction of the transmission line; and (3) Siemens Energy, Inc., Siemens S.A.C. and
Siemens Power Generation, Inc. for the construction of the substation.

94

 
 
 
 
 
 
In May 2016, Samay I reached its COD on schedule, in accordance with the terms of its agreement with the Peruvian government, with a total development cost of $379 million (excluding $26

million of diesel fuel inventory). In July 2016, Samay I, Posco (the EPC contractor) and General Electric (the manufacturer of the turbines) inspected the plant’s units, and such inspections revealed
damage to the shafts in three of the plant’s four units. As a result, all of the plant’s four units were declared unavailable to the system. The MINEM and OSINERGMIN were informed that there has been
a force majeure event which has caused the plant to be placed offline. Samay I also notified the project lenders and its insurance providers of the incident. Samay I continued to receive payments under
its PPA while the plant was offline, but such payments were subject to negative adjustments depending on the amount of time the plant was unavailable when called for dispatch. In 2016, Samay I was
subject to negative revenue adjustments of approximately $3 million as a result of Samay I’s unavailability.

By February 2017, all four of the units had been declared available to the system. The cost of the repairs was paid by the EPC contractor. To the extent IC Power is required to incur costs
relating to the outage, including repair costs and loss of profits, IC Power intends to seek coverage from the EPC contractor and/or the insurance coverage (subject to deductibles). For further information
on Samay I’s insurance, see “ —Insurance. ”

Israel Segment

The following summaries provide a description of the portfolio of IC Power’s generation assets in its Israel segment.

OPC-Rotem

IC Power’s 80% stake in OPC-Rotem is held indirectly through ICPI. The remaining 20% is held by Veolia, which, in 2015, was acquired by Oaktree Capital Management, an investment
management firm. In July 2013, OPC-Rotem became Israel’s first IPP by commencing commercial operation of its power station, located in Mishor Rotem industrial zone in the south of Israel. The
OPC-Rotem plant was constructed for an aggregate cost of approximately $508 million. OPC-Rotem’s combined cycle plant has a capacity of 440 MW, representing approximately 3% of the installed
capacity and approximately 14% of the installed capacity provided by IPPs in Israel as of December 31, 2016 (excluding renewables). Given Israel’s growing economy and the advanced age of the
existing state-owned power generation facilities, we believe OPC-Rotem provides IC Power with a strategic position in the Israeli electricity market and thereby provides it with an opportunity to
participate in additional power projects in Israel, which IC Power believes may become available to private sector participants in connection with Israel’s growing energy industry.

OPC-Rotem purchases natural gas from the Tamar Group, pursuant to a natural gas supply agreement that expires upon the earlier of June 2029 or the date on which OPC-Rotem consumes the

entire contractual capacity. The EA’s generation component tariff is the base for the natural gas price linkage formula in the agreement between OPC-Rotem and the Tamar Group. For further
information on OPC-Rotem’s gas supply agreement, see “— IC Power’s Raw Materials and Suppliers—Natural Gas Supply and Transportation Agreements. ”

During the years ended December 31, 2016, 2015 and 2014, OPC-Rotem generated revenues of $311 million, $318 million and $413 million, respectively, representing 17%, 25% and 30% of

IC Power’s consolidated revenues, respectively. During the year ended December 31, 2016, OPC-Rotem generated 3,487 GWh.

The following table sets forth certain information for OPC-Rotem’s plant for each of the periods presented:

December 31,
2016

2016

2015

2014

As of Year Ended December 31,

Plant

OPC-Rotem

  Installed Capacity  
(MW)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

440 

3,487 

91% 

3,811 

99% 

3,465 

90%

OPC-Rotem has a PPA with IEC, the government-owned electricity generation, transmission and distribution company in Israel, or the IEC PPA. The term of the IEC PPA lasts until 20 years
after the power station’s COD ( i.e. 20 years from July 2013). The IEC PPA is a “capacity and energy” agreement, committing OPC-Rotem to provide the entire net available capacity of its power station
to IEC and to generate power at such volumes and schedules as required by IEC. The terms of the IEC PPA allow OPC-Rotem to carve out energy and capacity for direct sales to private consumers, and
OPC-Rotem has accordingly allocated the entire capacity of the plant to private consumers since COD. As a result, OPC-Rotem supplies energy to approximately 28 end users according to long-term
PPAs (generally for a minimum of 10 years). Under the IEC PPA, OPC-Rotem can also elect to revert back to supplying to IEC instead of to private customers. As of December 31, 2016, the weighted
average remaining life of OPC-Rotem’s PPAs with end users based on firm capacity was approximately six years. In the year ended December 31, 2016, OPC-Rotem’s energy and capacity sales to end
users represented 97% of OPC-Rotem’s total energy and capacity sales.

Mitsubishi Heavy Industries of Japan provides the long-term servicing of the power station, for a term of 100,000 hours of operation, or 12 years based upon the expected operations of the

power station, which is consistent with IC Power’s strategy of entering into long-term servicing agreements with OEMs to help ensure the efficiency and productivity of its generation plants.

95

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In March 2014, one of IC Power’s subsidiaries was awarded a tender published by the Israel Land Authority to lease a plot of land adjacent to the OPC-Rotem site. The plot, which is large

enough to house another combined cycle or similar generation facility, may be used to expand OPC-Rotem’s capacity in the long-term.

IC Power has entered, through its subsidiary ICPI, into a shareholders’ agreement which grants minority rights to OPC-Rotem’s minority shareholder. For further information on IC Power’s

shareholders’ agreements, see “ —Shareholders’ Agreements” and for further information on the risks related to IC Power’s shareholders’ agreements, see “ Item 3.D Risk Factors—Risks Related to IC
Power—IC Power has granted rights to the minority shareholders of certain of its subsidiaries. ” For further information on the regulation of the Israeli electricity sector, see “ —Regulatory,
Environmental and Compliance Matters—Regulation of the Israeli Electricity Sector. ”

OPC-Hadera

In August 2015, IC Power acquired 100% of the shares of OPC-Hadera from Hadera Paper, a large paper and paper product manufacturer in Israel. The consideration for the transaction was

NIS 60 million (approximately $16 million). OPC-Hadera, which currently operates an 18 MW plant, holds a conditional license for the construction of a cogeneration power station in Israel. OPC-
Hadera commenced construction of the plant in June 2016. IC Power expects that the total cost of completing the OPC-Hadera plant (including the consideration for the acquisition of OPC-Hadera) will
be approximately $250 million, based upon a plant with 140 MW of capacity.

In January 2016, OPC-Hadera entered into an approximately $150 million EPC contract in connection with the project. The OPC-Hadera plant is expected to reach its COD by early 2019. As of

December 31, 2016, OPC-Hadera had completed approximately 35% of the project. In July 2016, OPC-Hadera entered into a NIS 1 billion (approximately $261 million) loan agreement to finance the
construction of the OPC-Hadera plant. The financing consists of an approximately $200 million long-term facility intended to cover the cost of construction (representing approximately 80% of the total
project cost) and approximately $61 million in additional facilities. In March 2017, following the full investment of the project’s equity contribution, OPC-Hadera made its first drawings under the loan
agreement. For further information on the OPC-Hadera financing, see “ Item 5.B Liquidity and Capital Resources—IC Power’s Liquidity and Capital Resources—IC Power’s Material Indebtedness—
OPC-Hadera Financing .”

OPC-Hadera’s power plant is expected to supply the electricity and steam needs of Hadera Paper’s facility as well as to provide electricity to end users in Israel. The power plant will operate

using natural gas and diesel fuel and is expected to have a relatively high level of energy utilization due to usage of the cogeneration technology, which supplies electricity and steam in a single
production process.

In June 2015, OPC-Hadera entered into an agreement with Hadera Paper for OPC-Hadera’s supply of electricity and steam from the OPC-Hadera power plant to be constructed by IC Power to

Hadera Paper’s facility from closing and for a period of 18 years from the date the power plant reaches its COD. Pursuant to this agreement, Hadera Paper will acquire all of its electricity and steam
needs from OPC-Hadera. The agreement provides for minimum quantities of steam to be purchased by Hadera Paper, which will be subject to adjustment. Until OPC-Hadera reaches its COD, OPC-
Hadera will supply steam and electricity to Hadera Paper using its old equipment purchased.

Additionally, Hadera Paper has a gas supply agreement with the Tamar Group and a related gas transport agreement with Israel Natural Gas Lines Ltd., both of which were assigned to OPC-

Hadera in connection with the acquisition.

In connection with the acquisition, Hadera Paper agreed to sell certain equipment that it uses to produce steam, and approximately 25 MW of additional capacity, within its manufacturing plant

to OPC-Hadera. OPC-Hadera will also lease from Hadera Paper the land on which the power generation plant is located for a period of 20 years from OPC-Hadera plant’s COD.

In the years ended December 31, 2016 and 2015, OPC-Hadera generated revenues of $45 million and $8 million, representing 2% and 1% of IC Power’s consolidated revenues, respectively.

Central America Segment

The following summaries provide a description of the portfolio of IC Power’s generation assets in its Central America segment.

96

 
 
 
 
 
 
 
 
 
 
 
 
 
Nicaragua

ICPNH

IC Power’s operations in Nicaragua are carried out through ICPNH. IC Power owns 100% of ICPNH, which it acquired in March 2014 and which was formerly known as AEI Nicaragua.

ICPNH owns and operates four power generation plants located throughout Nicaragua through its indirect (i) 65% equity interest in Corinto, (ii) 65% equity interest in Tipitapa Power, (iii) 61% equity
interest in Amayo I, and (iv) 61% equity interest in Amayo II. Corinto and Tipitapa Power, which have a combined capacity of 122 MW, are powered by HFO. The Corinto and Tipitapa Power plants
house fuel storage tanks on site with capacity of approximately 90 thousand barrels and 63 thousand barrels, respectively. Amayo I and Amayo II have a combined capacity of 63 MW of wind power
energy. Collectively, these four entities represent a capacity of 185 MW, approximately 17% of the total capacity of the Nicaraguan interconnected system as of December 31, 2016.

During the years ended December 31, 2016 and 2015, ICPNH generated revenues of $90 million and $111 million, representing 5% and 9% of IC Power’s consolidated revenues, respectively.

During the year ended December 31, 2016, ICPNH generated 978 GWh, representing 22% of the Nicaraguan interconnected system’s energy requirements. ICPNH has committed to sell its available
energy, as follows:

·

·

Corinto has commitments for 70% of its available energy in every year up to December 2018;

Tipitapa Power has commitments for 100% of its available energy in every year up to December 2018;

· Amayo I has commitments for 100% of its available energy in every year up to March 2024; and

· Amayo II has commitments for 100% of its available energy in every year up to March 2025.

97

 
 
 
 
 
 
 
 
The following table sets forth certain information for ICPNH’s plants for each of the periods presented:

Year of
Commission  

As of
December 31,
2016
Installed Capacity  
(MW)

1999 

1999 
2009 
2010 

71 

51 
40 
23 
185 

Plant

Corinto   
Tipitapa
Power
Amayo I  
Amayo II  
Total   

2016

Years Ended December 31,
2015

2014

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

368 

369 
144 
97 
978 

71 

94 
95 
98 

476 

345 
186 
88 
1,095 

93 

92 
94 
70 

494 

327 
174 
104 
1,099 

93 

98 
98 
96 

In December 2014, ICPNH’s wind farm complex in Nicaragua sustained damage in connection with a blackout in the SIN, which left one wind turbine collapsed and another two wind turbines
with severe damage. The contracted operator had the responsibility to replace the turbines. In early 2016, the three damaged turbines, which represented 10% of all of IC Power’s installed capacity at its
Amayo I and Amayo II plants, were replaced and re-commenced commercial operations.

In March 2016, a unit of ICPNH’s barge-mounted power plant (Corinto) sustained damage in connection with a machinery breakdown. The relevant unit has an installed capacity of 18 MW,

and represents 25% of all IC Power’s installed capacity at the Corinto plant. This event was covered by insurance. The relevant unit came back on-line in February 2017.

Guatemala

Puerto Quetzal

IC Power owns 100% of Puerto Quetzal, which represents its initial entry into the Guatemalan power generation market. Puerto Quetzal, which IC Power acquired in September 2014, utilized
three floating power barges with HFO generators, representing 234 MW, at the time of its acquisition. In November 2014, Puerto Quetzal transferred one of its three power barges, which has a capacity
of 55 MW, to IC Power’s Panamanian subsidiary Kanan. As a result, Puerto Quetzal now operates two power barges with an aggregate capacity of 179 MW, representing approximately 5% of the total
capacity in the Guatemala interconnected system as of December 31, 2016. The Puerto Quetzal plant houses fuel storage tanks on site with capacity of approximately 200 thousand barrels.

In 2016, Puerto Quetzal entered into multiple short-term PPAs.

During the years ended December 31, 2016 and 2015, Puerto Quetzal generated revenues of $55 million and $109 million, representing 3% and 8% of IC Power’s consolidated revenues,

respectively. During the year ended December 31, 2016, Puerto Quetzal generated 364 GWh, representing 3% of the Guatemalan system’s energy requirements.

The following table sets forth certain information for Puerto Quetzal’s plant for each of the periods presented:

Year of
Commission  

As of
December 31,
2016
Installed Capacity  
(MW)

2016

Years Ended December 31,
2015

2014

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

1993 

179 

364 

95 

673 

94 

490 

97 

Plant

Puerto
Quetzal

Guatemel

In January 2016, IC Power acquired 100% of Guatemel, an electricity trading company that supplies large users within Guatemala’s unregulated sector, in connection with acquisition of

Energuate.

Guatemel enters into sales contracts with its customers under which it sells a specified amount of capacity to each customer. Guatemel has outstanding agreements As of December 31, 2015 and

2014, Guatemel had agreements to supply capacity and electricity to 46 and 58 large customers, respectively, which consumed an average of  57 GWh and 74 GWh annually, respectively.

El Salvador

Nejapa

IC Power owns 100% of Nejapa in El Salvador.

98

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nejapa owns and operates 27 diesel generators (located in a single facility) powered by HFO. Nejapa has a capacity of 140 MW, representing 9% of the total capacity of El Salvador as of

December 31, 2016. The Nejapa plant houses fuel storage tanks on site with capacity of approximately 47,000 barrels. In addition, Cenérgica, one of IC Power’s wholly-owned subsidiaries, maintains a
fuel depot and marine terminal and owns three fuel storage tanks with an aggregate capacity of 240,000 barrels in Acajutla, El Salvador.

During the years ended December 31, 2016, 2015 and 2014, Nejapa generated revenues of $83 million, $100 million and $132 million, respectively, representing 4%, 8% and 10% of IC

Power’s consolidated revenues, respectively. During the year ended December 31, 2016, Nejapa generated 387 GWh, representing 5.9% of the national interconnected electrical system of El Salvador.
Nejapa has committed to sell over 50% of its available energy (in MWh) in every year up to 2017.

The following table sets forth certain information for Nejapa’s plant for each of the periods presented:

As of
December 31,
2016
Installed
Capacity
(MW)

Year of
Commission  

Years Ended December 31,

2016

2015

201 4

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

1995  

140 

387 

97 

440 

96 

376 

97 

Plant

Nejapa  

Panama

Kanan

IC Power owns 100% of Kanan. In October 2014, Kanan was awarded a five-year contract in connection with the Panamanian government’s call for emergency bids to attempt to cover

electricity shortfalls in Panama in the short-term. Kanan’s contract to supply energy in Panama, with a maximum contractual capacity of 86 MW, became effective in December 2015. To facilitate
Kanan’s supply of this energy, IC Power has transferred thermal generation units, in the form of barges, from its subsidiaries Puerto Quetzal and CEPP to Kanan with a total capacity of 92 MW, which
represented approximately 3% of the total capacity of Panama as of December 31, 2016. As a result, Kanan’s capacity of 92 MW consists of (i) a 55 MW power barge transferred to Kanan by Puerto
Quetzal in November 2014, and (ii) a 37 MW power barge transferred to Kanan by CEPP in November 2014. Both barges were successfully relocated to Panama and connected to the Panamanian power
system. In April 2016, Kanan reached COD (with a total development cost of $87 million) and commenced full commercial operations with an installed capacity of 92 MW.

In April 2017, Kanan experienced a fire, and as a result of the fire, both its 55 MW and 37 MW barges were placed off-line. For further information on the incident, see “ Item 5. Operating and

Financial Review and Prospects—Recent Developments—IC Power—Fire at Kanan Plant .”

Other Segment

The following summaries provide a description of the portfolio of assets in IC Power’s Other segment.

Bolivia

COBEE

IC Power owns 100% of COBEE. COBEE is the third largest generator of electricity in Bolivia, generating power from ten run-of-the-river hydroelectric plants in the Zongo river valley, four
run-of-the-river hydroelectric plants in the Miguillas river valley, and two open-cycle natural gas powered generation turbines at a plant located in El Alto-Kenko, adjacent to La Paz, Bolivia. IC Power
owns water rights in connection with operation of COBEE. COBEE has capacity of 228 MW, representing 12% of the total capacity of Bolivia as of December 31, 2016.

During the years ended December 31, 2016, 2015 and 2014, COBEE generated revenues of $40 million, $43 million and $41 million, respectively, representing 2%, 3% and 3% of IC Power’s

consolidated revenues, respectively. During the year ended December 31, 2016, COBEE generated 889 GWh, representing 10% of the national interconnected electrical system of Bolivia’s energy
requirements.

99

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth certain information for each of COBEE’s plants for each of the periods presented:

Year of
Commission

Elevation
(meters)

As of
December 31,
2016
Installed
Capacity
(MW)

Years Ended December 31,

2016

2015

2014

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

1997
1997
1938
1942
2006
1956
1966
1969
1974
1999

1931
1936
1939
1958
1995

4,264 
3,889 
3,492 
2,697 
2,572 
2,210 
1,830 
1,480 
1,195 
945 

4,140 
3,827 
3,283 
2,874 
4,050 

11 
9 
7 
23 
18 
10 
25 
26 
28 
30 

4 
6 
6 
6 
19 
228 

9 
7 
27 
94 
67 
54 
107 
125 
130 
162 

7 
17 
30 
36 
17 
889 

96 
100 
98 
97 
96 
96 
98 
96 
95 
96 

99 
94 
95 
97 
46 

10 
13 
39 
128 
86 
24 
139 
162 
163 
180 

9 
19 
37 
42 
30 
1,081 

98 
98 
99 
95 
97 
34 
96 
95 
94 
92 

91 
92 
95 
94 
50 

9 
11 
34 
91 
84 
15 
127 
156 
163 
198 

9 
19 
37 
43 
90 
1,086 

99 
99 
97 
80 
98 
17 
95 
95 
95 
96 

99 
99 
98 
97 
93 

Plant

Zongo Valley
plants:

Zongo  
Tiquimani  
Botijlaca  
Cutichucho  
Santa Rosa  
Sainani 1   
Chururaqui   
Harca  
Cahua  
Huaji  
Miguillas Valley

plants
Miguillas  
Angostura  
Choquetanga   
Carabuco  
El Alto-Kenko 2
Total   
____________________

1. Plant was temporarily out of service due to damages sustained as a result of landslides in March 2014. The plant, which cost approximately $5 million to repair, came back on-line in August 2015.

The company maintains insurance which covers the loss of revenue as a result of property damage and business interruption for up to 12 months.

2. Reflects the effective capacity of El Alto—Kenko, which is comprised of two open-cycle turbines. The turbines have an installed capacity of 29 MW. However, as a result of the high altitude of the

turbines (which are located at 4,050 meters above sea level), the installed capacity of these turbines are de-rated, resulting in an effective capacity of 19 MW.

Although the Bolivian government has nationalized entities in its power utility market, as recently as 2012, IC Power is unaware of any steps the Bolivian government may take, or is currently

taking, with respect to nationalizations within the Bolivian power utility market, generally, or with respect to COBEE, in particular. For further information on the risks related to the Bolivian
government’s nationalization of certain generation companies, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—The Bolivian government has nationalized energy
industry assets, and IC Power’s remaining operations in Bolivia may also be nationalized. ”

Chile

Central Cardones

IC Power owns 87% of Central Cardones; the remaining 13% is held by Central Cardones’ former controlling shareholder, South World Consulting S.A., an energy consulting and business

development firm. IC Power acquired its interest in Central Cardones in December 2011 to obtain an initial footprint in the Chilean power market. Central Cardones owns and operates one open-cycle
diesel Siemens turbine located in the northern part of the SIC and was the first Chilean power facility to be included in IC Power’s portfolio. Central Cardones has an installed capacity of 153 MW,
representing 1% of the total installed capacity of Chile as of December 31, 2016. Central Cardones’ power plant is used primarily for cold reserve capacity as a peaking unit, generally operating only in
extraordinary situations. Central Cardones receives revenues from its allocation of available system capacity and does not have any customers. During the years ended December 31, 2016, 2015 and
2014, Central Cardones generated revenues of $13 million, $14 million and $11 million, respectively, representing approximately 1% of IC Power’s consolidated revenues in each of the respective
periods.

100

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 
 
The following table sets forth certain information for Central Cardones’ plant for each of the periods presented:

As of
December 31,
2016

Years Ended December 31,

2016

2015

2014

Plant

Commission   Installed Capacity 

Year of

(MW)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Central
Cardones

Colmito

2009 

153 

— 

98 

4 

97 

— 

97 

IC Power owns 100% of Colmito. Colmito, which IC Power acquired in September 2013, owns and operates a dual fuel open-cycle Rolls Royce aeroderivative turbine that commenced

operation in August 2008. Although the Colmito plant previously operated with diesel oil as a backup for the SIC, the plant was connected to a natural gas pipeline in February 2015, and has begun to
purchase natural gas on a seasonal basis to generate energy. Colmito’s generation facility is located in the central part of the SIC. Colmito has an installed capacity of 58 MW, representing 0.3% of the
total installed capacity of Chile as of December 31, 2016.

During the years ended December 31, 2016, 2015 and 2014, Colmito generated revenues of $21 million, $28 million and $38 million, respectively, representing 1%, 2% and 3% of IC Power’s

consolidated revenues, respectively. During the year ended December 31, 2016, Colmito generated 8 GWh.

The following table sets forth certain information for Colmito’s plant for each of the periods presented:

As of
December 31,
2016

Years Ended December 31,

2016

2015

2014

Plant

Commission   Installed Capacity 

Year of

(MW)

Gross Energy
Generated
(GWh)

  Availability Factor 
(%)

Gross Energy
Generated
(GWh)

  Availability Factor 
(%)

Gross Energy
Generated
(GWh)

Colmito   

2008 

58 

8 

99 

27 

99 

  Availability Factor  
(%)

6 

95 

Dominican Republic

CEPP

IC Power owns 97% of CEPP; the remaining 3% is held by Basic Energy LTD Bahamas. CEPP owns and operates 12 generation units powered by HFO at two plants located in Puerto Plata,

Dominican Republic. The CEPP I plant is located on land and consists of three Wartsila V32 diesel generators burning HFO with a combined capacity of 17 MW. The CEPP II plant generates power on
a barge near the shore, which contains nine Wartsila V32 diesel generators burning HFO, that is moored at a pier adjacent to the CEPP I plant and has capacity of 50 MW. In the third quarter of 2013,
CEPP purchased second a barge with a capacity of 37 MW for $5 million. This barge contains seven engines, five with 5.5 MW of capacity and two with 5 MW of capacity. CEPP completely
refurbished this barge at a total cost of $16 million, and, in November 2014, transferred this barge to IC Power’s subsidiary Kanan.

Excluding the capacity associated with the refurbished barge that has been transferred to Kanan, CEPP has a capacity of 67 MW, representing approximately 2% of the total capacity in the

Dominican Republic as of December 31, 2016. The CEPP I plant and the CEPP II plant also have fuel storage tanks on-site with an aggregate storage capacity of 56,000 barrels.

During the years ended December 31, 2016, 2015 and 2014, CEPP generated revenues of $29 million, $39 million and $73 million, respectively, representing 2%, 3% and 5% of IC Power’s

consolidated revenues, respectively. During the year ended December 31, 2016, CEPP generated 264 GWh, representing 2% of the national interconnected electrical system of the Dominican Republic’s
energy requirements.

The following table sets forth certain information for each of CEPP’s plants for the periods presented:

As of
  December 31, 2016 

2016

Years Ended December 31,
2015

201 4

Plant

Commission   Installed Capacity  

Year of

CEPP I
CEPP II
Total   

1990 
1994 

(MW)

16 
51 
67 

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

Gross Energy
Generated
(GWh)

  Availability Factor  
(%)

54 
210 
264 

75 
79 

67 
231 
298 

34 
42 

51 
191 
242 

34 
42 

Prior to September 2014, CEPP was party to two long-term PPAs, representing 75% of its capacity. As a result of the expiration of these PPAs, all of CEPP's energy sales in 2015 and 2016

were made on the spot market. For further information on the risks related to spot market sales, see “ Item 3.D. Risk Factors—Risks Related to IC Power—IC Power is exposed to electricity spot market,
fuel and other commodity price volatility .”

101

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
Agua Clara

IC Power is starting development of a 50 MW wind project in the Dominican Republic, which is expected to commence commercial operations in 2018, subject to obtaining a concession. IC

Power has entered into a PPA with a government entity for a period of 20 years; the PPA is subject to the grant of a concession which remains outstanding. IC Power is in the process of selecting an EPC
contractor and lenders for the project. The total project cost is estimated to be approximately $100 million, of which approximately 70% is expected to be debt-financed.

Jamaica

JPPC

IC Power owns 100% of JPPC, as a result of its purchase in May 2014 of the 84% of JPPC’s outstanding equity interest that IC Power did not own, which increased IC Power’s equity interest in

JPPC from 16% to 100%. JPPC owns and operates two diesel generation units burning HFO and a combined-cycle steam turbine at a plant located in Kingston, Jamaica. JPPC has capacity of 60 MW,
representing approximately 6% of the total capacity of the Jamaican interconnected system as of December 31, 2016. JPPC’s plant has fuel storage tanks on site with an aggregate storage capacity of
50,000 barrels.

During the years ended December 31, 2016,  2015 and 2014, JPPC generated revenues of $42 million, $45 million and $41 million, respectively, representing 2%, 3% and 3% of IC Power’s

consolidated revenues, respectively. During the year ended December 31, 2016, JPPC generated 408 GWh, representing 6% of the Jamaican interconnected system’s energy requirements. JPPC has
committed to sell over 50% of its available energy in every year up to 2018.

The following table sets forth certain information for JPPC’s plant for each of the periods presented:

As of
December 31,
2016
Installed
Capacity
(MW)

Year of
Commission  

Years Ended December 31,

2016

2015

2014

Gross Energy
Generated
(GWh)

Availability
Factor
(%)

Gross Energy
Generated
(GWh)

Availability
Factor
(%)

Gross Energy
Generated
(GWh)

Availability
Factor
(%)

1998 

60 

408 

85 

445 

86 

425 

85 

Plant

JPPC

Colombia

Surpetroil

IC Power owns 60% of Surpetroil; the remaining 40% is owned by Mr. Yesid Gasca Duran. Surpetroil is dedicated to power generation utilizing stranded and associated natural gas reserves and

operates three power plants fueled by natural gas in different parts of Colombia. Surpetroil also transports and distributes compressed natural gas within Colombia. The Surpetroil plants have a
generation capacity of 31 MW, representing approximately 0.2% of the total capacity in the Colombian interconnected system as of December 31, 2016. Of this capacity, only 10 MW (Surpetroil’s
Purificación plant) are connected to the Colombian interconnected system.

During the years ended December 31, 2016 and 2015, Surpetroil generated revenues of $8 million and $8 million, respectively, representing less than 1% and 1% of IC Power’s consolidated
revenues in each of the periods. During the year ended December 31, 2016, Surpetroil generated 75 GWh, and primarily provided energy to Enertolima, an affiliate of Enel Group, via the Purificación
plant.

Plant

La Hocha
Purificación
Entrerios
Geopark

As of
December 31,
2016
Installed
Capacity
(MW)

2 
10 
3 
16 
31 

Year of
Commission  

2011 
2014 
2015 
2015-2016 

________________________

1. As a result of gas unavailability during December 2014.

Years Ended December 31,

2016

2015

2014

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

Gross Energy

Generated  

(GWh)

Availability
Factor
(%)

25 
3.8 
98 
99 

10 
19 
12 
2 
43 

84 
100 
98 
100 

47 
1 
— 
— 
48 

98 
11  
— 
— 

1 
2 
15 
56 
74 

102

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
In March 2017, IC Power entered into an agreement with Surpetroil’s minority shareholder Mr. Yesid Gasca Duran pursuant to which the parties stated that they would no longer proceed with

jointly developing the Surpetroil assets and would divide the assets between them. The transaction is subject to the satisfaction of closing conditions which must be satisfied within 90 days of the
agreement. For further information, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—IC Power—Agreement with respect to Interests in Colombian Assets. ”

RECSA

In January 2016, IC Power acquired 100% of RECSA – an electricity transmission company that supports Guatemala’s electrical system by operating 32 km of transmission lines and eight sub-

stations—in connection with IC Power’s acquisition of Energuate.

RECSA operates its transmission lines under an authorization granted by the Guatemalan government that will expire in 2057. Generators, transportation companies, distributors, electricity

brokers and unregulated customers pay for their connection to, and use of, RECSA’s transmission lines.

Panama

Pedregal

IC Power owns 21% of Pedregal; of the remaining 79%, (1) 55% is held by IEH Jamaica (Cayman), a private equity investment firm; (2) 12% is held by Burmeister & Wain Scandinavian

Contractor A/S, an operating company of the Mitsui Group; and (3) 11% is held by The Industrialization Fund for Developing Countries, a fund focusing on promoting economic activities in developing
countries. Although Pedregal is located in Central America, it is not included as part of IC Power’s Central America segment because IC Power does not consolidate Pedregal’s results in its income
statement, but account for its investment in Pedregal under the equity method, recording its share in income of associated companies.

Pedregal owns and operates three generation units powered by HFO at a plant located in Pacora, Panama. Although IC Power has a non-controlling interest in Pedregal, Pedregal has entered

into a management services agreement with IC Power’ wholly-owned subsidiary Inkia Panama Management that expires in July 2017. Under this agreement, Inkia Panama Management has been
designated as the administrator responsible for day-to-day management of Pedregal.

Pedregal has an installed capacity of 54 MW, representing approximately 2% of the total installed capacity in the Panamanian interconnected system as of December 31, 2016. Pedregal’s plant

also has fuel storage tanks on site with an aggregate storage capacity of 51,402 barrels.

During the year ended December 31, 2016, Pedregal generated 264 GWh, representing 2% of the Panamanian interconnected system’s energy requirements. Pedregal has committed to sell over

60% of its available energy in 2016.

Distribution Operations

In January 2016, IC Power acquired:

·

Energuate, the trade name for IC Power’s Guatemalan electricity distribution businesses, which consists of:

· DEORSA, in which IC Power holds a 93% interest; the remaining 7% interest is held by private minority shareholders; and

· DEOCSA, in which IC Power holds a 91% interest; the remaining 9% interest is held by private minority shareholders.

History and Background

In January 2016, IC Power acquired Energuate from Deorsa-Deocsa Holdings Limited, an investment company of Actis LLP, a private equity firm, which had acquired the businesses in 2011.

IC Power paid $266 million in cash for the businesses (as well as Guatemel and RECSA) and assumed debt of $288 million. IC Power funded the payment of the acquisition through internally generated
funds and a $120 million loan facility, which IC Power entered into in December 2015.

103

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DEORSA and DEOCSA were both founded in 1998, when the Guatemalan government conducted an auction for these companies as part of the privatization of the Guatemalan electricity

sector. As a result of the auction, DEORSA and DEOCSA were sold to Union Fenosa, a gas company, and to employees of DEORSA and DEOCSA.

Energuate

Energuate consists of two electricity distribution companies in Guatemala that, as of December 31, 2016, provided services for approximately 1.7 million regulated customers in Guatemala

(representing approximately 54% of Guatemala’s regulated distribution customers) and distributed energy to a service area of approximately 100,000 km 2 in Guatemala, covering primarily rural areas
with a population of approximately 12 million inhabitants. Energuate operates approximately 70,000 km of distribution lines within Guatemala (representing approximately 83% of Guatemala’s
distribution lines) as of December 31, 2016. Energuate operates in 21 of Guatemala’s 22 departments and holds the non-exclusive right to distribute electricity within its service areas until 2048.

In the years ended December 31, 2016 and 2015, Energuate sold 2,316 GWh and 2,315 GWh of energy, respectively.

Service Area

Energuate has authorizations to provide electricity distribution services within its service area until 2048. Energuate operates in 21 of Guatemala’s 22 departments, excluding Guatemala City

and Sacatepéquez, covering approximately 100,000 km 2 and approximately 12 million inhabitants. DEORSA’s service area covers the northern and eastern regions of Guatemala, while DEOCSA’s
service area covers the south western region of Guatemala. DEOCSA’s authorization also includes the Department of Guatemala, but DEOCSA does not operate within this department. Energuate´s
authorizations are non-exclusive, and the MEM has historically granted, and may in the future grant, authorizations to one or more competing distribution companies, including EEGSA, in Energuate's
service area. As a result, portions of Energuate's service area may overlap with that of EEGSA and other Guatemalan distribution companies.

104

 
 
 
 
 
 
 
The following map indicates the areas in which DEORSA and DEOCSA operate.

Compared to the urban and residential departments in which the other large Guatemalan distribution company, EEGSA, operates, Energuate’s service area is predominantly rural and

characterized by lower electrification levels and underdeveloped infrastructure. For example, in Energuate’s service area, there are still some households that utilize propane and wood for cooking,
illumination and other household needs. As such, IC Power believes that Energuate’s service area shows room for further growth in electricity distribution. In addition, the Guatemalan government has
historically implemented projects to increase electrification levels in Guatemala and IC Power believes the Guatemalan government will continue to promote access to electricity through policies such as
subsidies for low-consumption rural clients.

105

 
 
 
The following chart shows the growth of electrification levels in Guatemala between 2009 and 2015.

As of December 31, 2016, the combined electrification level in Energuate’s service area was 87.9%.

Customer Base

As of December 31, 2016, Energuate provided electric service to approximately 1.7 million customers, which includes both regulated and unregulated customers. Energuate’s customer base is

divided into four categories:

·

·

·

Residential (some of whom receive subsidies for their purchase of electricity);

Commercial (small- to medium-sized enterprises, such as local hospitals, gas stations, irrigation pumps and small-sized agricultural facilities);

Industrial (large-sized enterprises, such as hotel and resort complexes, commercial malls and large-scale agricultural facilities); and

· Other (which includes certain government entities, such as municipalities).

The following table sets forth the volume of energy purchased, the percentage of purchased energy lost, the volume of energy distributed to Energuate’s consumers and the number of

Energuate’s consumers by category, during the periods indicated.

Energy purchased (GWh) 
Total electricity losses (%)
Energy distributed (GWh)
To regulated customers
Residential
Commercial
Industrial
Other customers
To unregulated customers 1
Number of customers
Regulated customers

Residential
Commercial
Industrial
Other customers

Unregulated customers 1
____________________

2016

Year Ended December 31,
2015

2014

2,882 
19.6% 
2,316 
2,216 
1,663 
253 
37 
262 
101 
1,679,446 
1,679,331 
1,674,916 
4,036 
81 
298 
115 

2,785 
16.9% 
2,315 
2,159 
1,612 
246 
35 
266 
157 
1,634,773 
1,634,616 
1,630,204 
4,037 
79 
296 
157 

2,631 
17.0%
2,184 
2,011 
1,499 
234 
27 
251 
174 
1,579,725 
1,579,555 
1,575,204 
3,991 
65 
295 
170 

1. Unregulated customers consist of end users with a demand exceeding 100 kW, consisting principally of industrial and commercial customers.

106

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Distribution Tariffs

Under the General Electricity Law and the regulations of the CNEE, the tariffs that Energuate charges to its regulated customers are subject to the approval of the CNEE. Energuate charges

distribution tariffs for all electricity delivered through its distribution system, whether to its customers or customers of wholesale electricity brokers.

There are seven different tariffs that are applicable to Energuate’s regulated customers. Each of Energuate’s regulated customers agrees to purchase electricity from Energuate at one of these

tariff rates. Energuate’s schedule of tariffs includes:

·

·

·

·

·

·

·

a social tariff available to customers with a demand of up to 300 kWh per month;

a regular tariff, available to all customers that purchase electricity at low voltage;

a low voltage peak tariff available to customers that purchase energy and capacity at low voltage (less than 1,000 volts), with a demand capacity between 11 kW and 100 kW, for no less
than 60% of the month, who are primarily commercial and industrial customers;

a low voltage off-peak tariff available to customers that purchase energy and capacity at low voltage (less than 1,000 volts), with a demand capacity between 11 kW and 100 kW, for less
than 60% of the month, who are primarily commercial and industrial customers;

a medium voltage peak tariff available to customers that purchase energy and capacity at medium voltage (greater than 1,000 volts and equal to or less than 60,000 volts), with a demand
capacity between 11 kW and 100 kW, for no less than 60% of the month, who are primarily commercial and industrial customers;

a medium tension off-peak tariff available to customers that purchase energy and capacity at medium voltage (greater than 1,000 volts and equal to or less than 60,000 volts), with a demand
capacity between 11 kW and 100 kW, for less than 60% of the month, who are primarily commercial and industrial customers; and

a tariff available to municipalities that purchase electricity for public lighting.

For further information on the seven tariffs applicable to Energuate’s regulated customers, see “ —Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan
Electricity Distribution Market—Tariffs and Tolls. ” The following table sets forth the volume of energy delivered by Energuate to its regulated customers by tariff during the periods indicated.

Tariff

Social tariff 
Regular tariff 
Low voltage peak tariff 
Low voltage off-peak tariff 
Medium voltage peak tariff 
Medium voltage off-peak tariff 
Public lighting tariff 

Energy distributed 

The tariffs collected by Energuate are comprised of:

2016

Year ended December 31,
2015
(GWh)

2014

1,205 
459 
108 
145 
18 
19 
262 
2,216 

1,175 
437 
100 
147 
14 
20 
266 
2,159 

1,102 
397 
74 
160 
2 
25 
250 
2,011 

·

·

an electricity charge, updated quarterly and designed to reimburse the distribution company for the cost of electricity and capacity that it purchases and transmission tolls to the
interconnection point with Energuate’s grid. The electricity charge consists of a base tariff and an electricity adjustment surcharge. Under the General Electricity Law and the regulations of
the CNEE, the base tariff is adjusted annually each year on May 1 to reflect anticipated changes in the cost of electricity to be purchased by Energuate during the following year. The
electricity adjustment surcharge is adjusted quarterly to reflect variations in the actual cost of electricity purchased by Energuate against the projected cost; and

a VAD charge designed to permit a model efficient distribution company to cover its operating expenses, complete its capital expenditure plans and recover its cost of capital.

The VAD component of the distribution tariff is revised every five years with semi-annual adjustments for inflation and local currency exchange rates against the US dollar. The VAD charges

are set by the CNEE. The VAD charge was last set in January 2014 and will expire in January 2019. In setting tariffs for system operation in Guatemala, the range for permitted theoretical after-tax
return on investment for distributors is between 7%—13%. Currently, the tariffs approved for Energuate’s authorizations contemplate approximately a 7.0% return. For further information on the
calculation of distribution tariffs, see “ —Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan Electricity Distribution Market—Tariffs and Tolls. ”

107

 
 
 
 
 
 
 
 
 
 
 
   
     
     
 
 
 
 
 
 
   
   
 
 
 
 
   
     
     
 
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
 
 
 
 
Authorizations

In 1998, the MEM granted authorizations to DEORSA and DEOCSA to use public property (including rivers) and impose easements on private lands, thus enabling them to deliver electricity
over their respective distribution systems in their service areas for a period of 50 years. The authorizations allow Energuate to conduct its operations and include the right to use public roads and other
public domain spaces and to obtain easements over certain state-owned and private lands in order to construct, maintain and operate its distribution system. The authorizations granted are non-exclusive.

The authorizations impose certain obligations on Energuate, such as the obligation to provide service to all consumers requesting such service within areas that are located within 200 meters of

Energuate’s distribution lines and maintain safety and quality standards, as well as customer satisfaction levels. The authorizations may be revoked at the discretion of the MEM if Energuate fails to meet
these standards, among others. In the event that Energuate’s authorizations are revoked, the MEM may sell Energuate’s distribution assets through a public auction. For further information on
Energuate’s authorizations to provide electricity distribution services in Guatemala, see “ —Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan Electricity Distribution
Market—Regulated Customers and Distribution Authorizations .”

Billing

Energuate bills its customers on a monthly basis. Most of Energuate’s customers have meters installed to record electricity usage, and customers are sent invoices each month based on their

total electricity consumption. Payments are required to be made 30 days from billing. By law, customers can accumulate two invoices without making a payment before their supply of electricity can be
terminated. Customers who fail to pay a bill will receive an interest charge on their subsequent bill for amounts not paid in the preceding month. Unpaid invoices are sent to Energuate’s internal
collections department, and generally, Energuate will cease supplying its services when a customer repeatedly fails to make payments. Energuate records a monthly provision for doubtful accounts based
on its past collection experience and management estimates regarding future collections. Amounts are written off when the collections department deems the account to be irrecoverable. In the years
ended December 31, 2016 and 2015, DEORSA’s collection rates were 98.2% and 99.1% respectively, and DEOCSA’s collection rates were 94.1% and 93.9%, respectively.

Energy Purchases

Energuate purchases the electricity it distributes to its customers through PPAs with generation companies, including, for example, IC Power’s subsidiary Puerto Quetzal. Guatemalan
distribution companies are required by the General Electricity Law to maintain PPAs with generating companies at all times to cover 100% of the maximum expected demand for the current year, as well
as the next year. Should the contracted capacity and electricity under its PPAs be insufficient to meet the demand of its customers, Energuate makes purchases on the spot market, only if authorized by
CNEE. Distribution companies can only purchase capacity and energy and enter into PPAs through a public bidding process supervised by the CNEE. As of December 31, 2016, Energuate was party to
over 70 PPAs.

The following table sets forth the supplier, the amount of contracted capacity and the expiration date of Energuate’s PPAs entered into with IC Power’s five largest suppliers of capacity as of

December 31, 2016, covering 71% of IC Power’s collective contracted capacity.

Supplier
Jaguar Energy Guatemala LLC 
INDE 
Energía del Caribe 
Renace, S.A. 
Eólico San Antonio El Sitio, S.A. 

Contracted Capacity 
(MW)

200 
162 
60 
55 
50 

Expiration Date
April 2030
April 2017 –April 2032
April 2030
April 2030 –April 2033
April 2030 –April 2032

Under most of its PPAs, Energuate pays a capacity charge and an energy charge. Energuate pays a specified amount for each MW of capacity purchased under these PPAs and an electricity

charge for the kWh of electricity actually delivered to Energuate. Most of Energuate’s PPAs also provide that the electricity charge is indexed to changes in published quotations for the type of fuel used
by the generator. In addition, Energuate is required to pay certain additional costs incurred by the generators to provide electricity including connection costs, transmission tolls, additional costs imposed
by the CNEE and other similar costs.

108

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Service Standards

Pursuant to its authorizations, Energuate is required to meet specified standards with respect to the quality and delivery of the electricity distributed to its customers. The quality standards refer

to the electricity’s voltage levels. A breach may be deemed to have occurred when there are changes in the voltage level. A monetary fine is imposed under Energuate’s authorizations for breaches
exceeding certain limits, with such fines credited towards the affected consumer’s next bill. Delivery standards refer to the frequency and duration of interruptions in the supply of electricity.

Energuate is also required to survey its customers annually to assess their satisfaction levels. The survey covers perceived service quality, technical services (measuring interruptions or
blackouts during the year) and overall customer service. If customer satisfaction levels set by the CNEE are not achieved, Energuate may be fined. If Energuate repeatedly incurs such fines, does not pay
fines that have been imposed or otherwise repeatedly provides deficient service, its authorizations may be revoked.

Energuate may be subject to other monetary fines and penalties for failure to comply with other terms of its authorization agreements. In the year ended December 31, 2016, Energuate paid

fines and penalties of $265 thousand, as compared to $503 thousand, in the year ended December 31, 2015.

In connection with its acquisition of Energuate, IC Power has established a goal to improve Energuate’s service standards, reducing interruptions, and improving customer service by achieving

faster response times.

Electricity Losses

Energuate experiences electricity losses in the form of technical and commercial losses. Technical losses are those that occur in the ordinary course of Energuate’s distribution of electricity or
those resulting from the specific characteristics of Energuate’s distribution network, and include losses due to energy dissipation in conductors and magnetic losses in transformers. Commercial losses
are those resulting from illegal connections, fraud or billing errors. Energuate’s total losses (comprising technical and commercial losses) in the year ended December 31, 2016 and 2015 were 19.6% and
16.9%, respectively. The distribution tariffs that Energuate charges its regulated customers include a VAD component, which provides for an allowance for losses incurred in the distribution of
electricity determined by the CNEE. To the extent that Energuate’s electricity losses exceed the approximately 15% allowance (which includes both technical and commercial losses) contemplated in the
current formula of the VAD component of the distribution tariff, Energuate will bear the cost of such losses.

IC Power’s management has established a multi-year program to reduce Energuate’s electricity losses. IC Power intends to reduce commercial losses through improving customer billing

practices to increase collection rates, increasing targeted inspections and meter replacements, implementing a communication program with local communities and modernizing Energuate’s facilities to
reduce tampering, especially in areas where electricity theft has been more prevalent, and reducing technical losses by investing in the modernization of Energuate’s transmission grid and distribution
system.

Distribution Network

Electricity is transferred from supply points connected with the Guatemalan National Electricity System, to customers through Energuate’s distribution system, which consists of a wide network

of overhead lines, cables and substations carrying successively lower voltages. As of December 31, 2016, Energuate’s distribution system included approximately 70,000 km of distribution lines,
representing approximately 83% of Guatemala’s distribution lines.

Transmission, Construction and Maintenance Services

Energuate pays tolls for transmission of electricity over the primary and secondary transmission systems. The cost of transmission tolls are included in the electricity charge in Energuate’s

tariffs, which are then passed through to Energuate’s customers.

Energuate has outsourced certain construction and maintenance activities to various third parties, who provide the following services to Energuate:

·

·

·

24-hour emergency services, including call center, fault response, building security and personal security services;

building new connections and installations;

providing connection and disconnection services; and

· maintaining and repairing installations and equipment, including substations, transformers and meeting stations.

109

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Seasonality

Seasonality does not have a significant impact on the demand for electricity in Energuate’s service area. Demand for electricity is consistent throughout the year due to a steady number of

daylight hours throughout the year and limited use of heating and air conditioning systems within Energuate’s service areas.

Employees

As of December 31, 2016, Energuate had a total of 760 employees, divided into operative, administrative and customer service employees. From time to time, Energuate contracts for the

service of temporary employees. As of December 31, 2016, approximately 62% of Energuate’s employees were unionized and were members of one of four labor unions, each of which are currently
party to collective bargaining agreements with DEORSA and DEOCSA. These agreements will be extended automatically a month before the date of expiration if a specified notice is otherwise not
provided. However, if a specified notice is provided, the agreements will be renegotiated, not terminated, and must meet certain conditions related to salary. The collective bargaining agreements
include, among other things, a 5% annual increase in salaries, which cannot be eliminated or reduced. In the case of Energuate’s employees, the increase was implemented for 2014, 2015 and 2016.

Guatemala Distribution Service Providers

The electricity distribution market in Guatemala is predominantly served by three companies: DEORSA and DEOCSA (which operate under the brand name “Energuate”) and EEGSA. In

addition, there are approximately 15 municipal distributors operating in the AMM. EEGSA operates in an urban and suburban service area, including the departments of Guatemala (which includes the
country’s capital, Guatemala City), Sacatepéquez and Escuintla and holds an authorization over the service area until 2048. In Guatemala, authorizations are non-exclusive. As a result, portions of
Energuate's service area may overlap with that of EEGSA and other Guatemalan distribution companies.

Potential Projects

IC Power is constantly monitoring and considering development and acquisition opportunities and is currently assessing projects in Israel and various Latin American countries, such as Chile,

Colombia, Argentina, Peru, the Dominican Republic, Mexico and Nicaragua relating to generation or distribution projects or companies. For example, IC Power is starting development of a 50MW wind
project in the Dominican Republic, which is expected to commence commercial operations in 2018, subject to the grant of a concession which remains outstanding. With respect to IC Power’s potential
generation projects, such projects range in size from small-scale power facilities (e.g., less than 40 MW) to large-scale power facilities (e.g., approximately 850 MW) and utilize different fuels and
technologies, including natural gas, hydroelectric, wind, coal and solar. In some instances, IC Power has acquired land, secured necessary licenses or rights, including temporary concessions and water
rights, commissioned studies, made bids, or initiated similar actions, in connection with its assessment of the feasibility of the relevant project.

Set forth below is a map summarizing certain of the markets and projects that IC Power has identified for potential expansion. Development projects imply a high degree of uncertainty, and
there is no guarantee that IC Power will proceed with these projects. Ultimately, notwithstanding the number of opportunities that IC Power may consider over the long- and short-terms, it will only
pursue those projects that it believes will generate attractive, risk-adjusted returns over the long-term and which it believes it has the management capacity to build and operate. In addition, in some
cases, IC Power may not obtain the relevant approval to develop a project. Furthermore, in many cases, IC Power will need to win tenders, obtain additional rights, permits, licenses, secure land
purchases and water rights and may need to negotiate with counterparties or conduct valuations and environmental studies, each of which could take years to satisfy, or may not be satisfied at all.

IC Power applies a disciplined approach to evaluating potential development projects. IC Power will not pursue projects or enter into countries at any cost, and is willing to lose competitive bids

if the expected returns on a project do not provide the appropriate risk-adjusted return. When it decides to pursue a development project, IC Power first seeks to secure a revenue stream as early as
possible in the development process of its plants by sourcing and entering into long-term PPAs, which provide its development projects with predictable projected margins and cash flows before
construction has commenced. Second, IC Power endeavors to construct projects by entering into turnkey EPC agreements that define the total project cost and transfer significant part of the risks of
construction delays and cost overruns to its EPC contractors. Finally, IC Power leverages its EPC contracts and PPAs to secure long-term project financing agreements which are generally stand-alone,
secured, project-specific and with no or limited recourse to IC Power. IC Power has not yet entered into EPC agreements, PPAs or financing agreements in connection with these potential projects.

110

 
 
 
 
 
 
 
 
 
 
 
The summary below sets forth projects developed and owned by IC Power, as well as projects owned by third parties, that IC Power may be able to acquire by direct negotiations or through

tender processes. This summary is not exhaustive, is only provided to show projects which IC Power is evaluating, and should not serve as an indication of any expectation regarding any final outcome:

Israel

Following recent government initiatives encouraging investments in the Israeli power generation market, the entrance of private developers has opened the door for a range of opportunities. IC
Power believes the OPC-Rotem plant, the first large-scale IPP in the country, provides it with a first-mover’s advantage to further expand IC Power’s presence in this fast growing, but stable market. In
addition, IC Power acquired an additional plot of land adjacent to OPC-Rotem, which is large enough to house another combined cycle or similar generation facility to expand OPC-Rotem’s capacity in
the long-term. The acquisition of the additional plot of land remains subject to final government approval. In addition, IC Power is considering potential acquisitions of third party projects in late stages
of development, and is considering participating in the upcoming tenders for solar projects.

In April 2017, IC Power entered into an agreement to acquire 95% of the shares of Zomet. Zomet holds the rights to develop a natural gas-fired power station at Plugot Junction, Israel of

approximately 396 MW, in addition to land rights and statutory approvals. Completion of the transaction is subject to the fulfillment of certain conditions, including receipt of various regulatory
approvals. The project has been approved as a national infrastructure project by the Israeli government and the National Infrastructure Committee of Israel. The natural gas power plant is expected to
produce electricity using open-cycle technology, and is expected to serve as a peaking unit. The project is expected to be funded through a combination of equity and project finance debt.

Peru

Peru, IC Power’s current core market, represents an attractive geography for further expansion, especially in the hydro segment. Peru has one of the fastest growing economies in Latin America,
with a long-term strong outlook for power demand coupled with a mature regulatory framework and a well-run power system. For these reasons, Peru remains a key growth focus for IC Power and it has
several opportunities under various stages of development in this country. IC Power has secured land, finished the feasibility studies and is pursuing environmental approval for two hydroelectric
projects with a combined capacity of approximately 550 MW. IC Power believes its strong presence in the Peruvian market gives it a competitive advantage at the time of materializing opportunities,
helping to identify and assess new developments in advance of other market participants.

In addition, IC Power may pursue opportunities to expand the installed capacity of its existing operating assets in Peru. For example, the Samay I plant, which reached COD in May 2016, will

operate as a cold reserve plant with diesel and currently has an installed capacity of 632 MW. Once natural gas becomes available to the facility through the Gasoducto Sur Peruano, the Samay I plant
will operate as a natural gas-fired power plant and will be able to do so with minor additional investments in Samay I’s facilities. When fueled by natural gas, the Samay I plant is expected to have an
installed capacity of approximately 720 MW. Finally, following an additional investment in the conversion of the Samay I plant, which IC Power has not committed to make, the Samay I plant could
operate as a combined cycle thermoelectric plant, which would increase Samay I’s installed capacity to approximately 1,080 MW.

111

 
 
 
 
 
 
 
 
Furthermore, IC Power may pursue opportunities to increase the installed capacity of the Las Flores plant, which has the environmental approvals and a permit to increase its installed capacity
through the construction of an additional 190 MW gas-fired expansion, and to convert both gas turbines (the existing turbine and the potential expansion) to combined cycle. Each 1x1 combined cycle
train would reach approximately 290 MW for a total of approximately 580 MW. Las Flores’ existing site has sufficient space to locate both combined-cycle expansions within its existing premises and
plant layout. IC Power has not yet committed to pursue the above mentioned expansions.

Chile

IC Power believes that Chile is one of the most attractive power markets in Latin America, characterized by a highly-efficient and investor-friendly model with a stable regulatory framework

and electricity demand growth.

IC Power is constantly monitoring and assessing opportunities in Chile. The acquisitions of Colmito and Central Cardones provided IC Power with the initial footprint from which to carry out

organic development strategy in this key market. Currently, IC Power has identified opportunities for thermal and renewable projects. In the thermal segment, IC Power has rights with respect to two
large plots of land in addition to a 50-year land concession from the government on which it may develop three independent thermal projects. “Los Rulos” recently obtained environmental approval to
build a large scale combined cycle fueled by natural gas, with diesel as emergency backup. IC Power has also installed wind metering masts, accumulated over two years of measurements, and partially
secured land for a potential 100 MW wind project. Chile represents one of the most attractive markets in Latin America, but historically it has also been a very challenging market  in which to obtain
environmental permits. As such, opportunities may take time to materialize.

Mexico

Mexico is enjoying strong momentum in the energy and infrastructure sectors following market reforms in 2013 and 2014. The reform of the electricity sector has driven, and is expected to

continue to drive, significant investments in new generation capacity. In addition, PEMEX, a Mexican state-owned petroleum company, has announced that it aims to reach an installed capacity of
approximately 3.1 GW in the medium-term by partnering with power companies for the development of cogeneration plants. The Mexican government has also announced initiatives towards the
development of significant renewable energy capacity, seeking to add approximately 4.6 GW of wind capacity over the next decade. Given the market’s size (second largest in Latin America after
Brazil), expected growth, strong demand and stability, IC Power opened an office in Mexico which is fully dedicated to the sourcing of opportunities and IC Power hopes to materialize prospects in the
short to medium term as a result of these efforts. IC Power is currently assessing a 50 MW wind project and a 55 MW barge relocation.

Argentina

As part of a new Argentinian government plan, the Argentinian government has introduced a new pricing scheme for energy generation companies, which implies an increase of approximately

25% to previous energy tariffs. In addition, as an effort to foster investments and add additional capacity to the system, the Argentinian government launched a 1 GW public auction for renewable
energy, with the goal of reaching 8% and 20% of installed capacity coming from renewable energy sources by 2017 and 2020, respectively. It is expected that additional tenders will follow for renewable
energy plants, as well as large-scale combined cycle plants.

Argentina is the third largest power market in Latin America. After years of underinvestment, a significant requirement for base load generation is expected, primarily to replace the percentage

of Argentina’s generation which relies on obsolete equipment (mostly conventional turbines and open-cycle turbines), as well as to address demand growth. As such, IC Power has decided to open a
development office in Buenos Aires. IC Power is currently assessing opportunities for a 650 MW combined cycle plant.

Nicaragua

IC Power is seeking to leverage its operational base and country knowledge by expanding its existing wind farm to reach 100MW.

Distribution Opportunities

The projects described above only represent opportunities in the generation segment. Following the acquisition of Energuate in January 2016, IC Power has dedicated considerable effort in
building and consolidating IC Power’s corporate team for the distribution business, which works with the local management of Energuate based in Guatemala. After achieving this consolidation, IC
Power believes it is now in a position to continue its growth in the distribution sector in order to provide IC Power with a diversified, uncorrelated and long-term source of income. IC Power is
considering several acquisition opportunities.

112

 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power’s Generation Customers

IC Power’s generation businesses’ customers include governments, local distribution companies, and/or non-regulated customers, depending upon the operating company and the particular

country of operation. IC Power’s generation companies seek to enter into long-term PPAs with power purchasers. For example, in 2016, Kallpa signed a long-term PPA with Southern Perú Copper
Corporation (Toquepalo) for the sale of electricity, and Kallpa has committed to sell over 50% of its available energy (in MWh) in every year through 2021.

Additionally, the majority of IC Power’s capacity has been contracted for sale, according to long-term agreements. For example, Kallpa has committed to sell over 50% of its available energy

(in MWh) in every year through 2021.

In attempting to limit the effects of such counterparty risks, each of IC Power’s generation companies analyzes the creditworthiness and financial strengths of its various counterparties during

the PPA negotiations as well as during the life of the agreement. Where the creditworthiness of the power purchaser is deemed to be below standard, various contractual agreements and structures are
negotiated (such as letters of credit, liquidity facilities, and government guarantees) to provide the credit support.

Under the terms of most of IC Power’s generation businesses’ PPAs, the power purchaser is contractually obligated to purchase energy, and sometimes capacity and/or ancillary services, from

the power generator based upon a base price (denominated either in U.S. Dollars or in the local currency) that is adjusted for (i) fluctuations in exchange rates, (ii) the U.S. inflation index, (iii) a local
inflation index, (iv) fluctuations in the cost of operating fuel, (v) supply of natural gas, (vi) transmission costs and/or (vii) spot prices in the case of an interruption of the supply or transportation of
natural gas. Many of these PPAs differentiate between peak and off-peak periods. Utilizing PPAs allows IC Power’s generation companies to lock in gross margins and provides IC Power and its
generation companies with earnings stability.

113

 
 
 
 
 
As of December 31, 2016, the weighted average remaining life of our significant PPAs based on firm capacity was 8 years. The following table sets forth a summary of the significant PPAs for

our generation companies as of December 31, 2016:

Principal Customer

Commencement

Expiration

Contracted Capacity 1

Peru Segment

Kallpa

CDA

Samay I
Israel Segment
OPC-Rotem

OPC-Hadera

Central America
Segment

Corinto

Tipitapa Power

Amayo I and Amayo II

Nejapa

Puerto Quetzal

Kanan

Other Segment
COBEE
Colmito
JPPC
Surpetroil

Enel Distribución Perú S.A.A., Luz del Sur S.A.A., Hidrandina S.A., Edecañete
S.A.A.,
Electosureste S.A., Seal S.A. 2
Enel Distribución Perú S.A.A., Luz del Sur S.A.A., Hidrandina S.A., Electosureste
S.A., Seal S.A., Electrosur S.A. 3
Sociedad Minera Cerro Verde S.A.A.
Compañía Minera Antapaccay S.A.
Southern Perú Copper Corporation
Southern Perú Copper Corporation (Toquepala)
Inretail Properties Management S.R.L.
Electroperú S.A.
Luz del Sur S.A.A. 5
Enel Distribución Perú S.A.A.
Edecañete
Luz del Sur S.A.A.
Enel Distribución Perú S.A.A.
Peruvian Investment Promotion Agency ( Pro Inversión )

PPA with Israel Electric Corporation 6
Hadera Paper
Hebrew University
Migdal
Alrov Group

Distribuidora de Electricidad del Norte S.A., Distribuidora de Electricidad del Sur
S.A.
Distribuidora de Electricidad del Norte S.A., Distribuidora de Electricidad del Sur
S.A.
Distribuidora de Electricidad del Norte S.A.,
Distribuidora de Electricidad del Sur S.A.,
Seven distribution companies
Seven distribution companies
Seven distribution companies
Comegsa
MEL
Ingenio La Unión
Cenérgica
CAES
DEOCSA
Empresa de Distribución Eléctrica Chiriqui (EDECHI)
Empresa de Distribución Eléctrica Elektra Nor Este S.A. (ENSA)
Empresa de Distribución Eléctrica Metro Oeste S.A. (EDEMET)

Minera San Cristóbal
ENAP Refinerías S.A.
Jamaica Public Services Company
PETROSUD
GEOPARK

January 2014

December 2021

January 2014

December 2023

January 2011
November 2011
April 2017
May 2017
September 2016
August 2016
January 2018
January 2022
January 2018
January 2022
January 2022
May 2016

July 2013
August 2015
January 2019
January 2019
January 2019

December 2020
December 2025
April 2027
May 2029
December 2021
December 2030
December 2027
December 2031
December 2027
December 2031
December 2031
April 2036

June 2032
September 2036
December 2028
December 2028
December 2028

June 1999

December 2018

April 1999
March 2009
March 2010
August 2013
August 2013
January 2015
January 2013
August 2014
May 2015
August 2015
August 2014
May 2016
December 2015
December 2015
December 2015

December 2008
January 2014
January 1998
March 2015
November 2015

December 2018
March 2024
March 2025
January 2018
July 2017
December 2017
April 2017
December 2017
April 2017
January 2017
December 2017
April 2017
December 2020
December 2020
December 2020

October 2017
December 2017
January 2018
June 2018
June 2017

350

210

132
100
120
70-85 4
93
200
169
30
3
65
16
600

447
12-51 7
22
37
9

50

51
40
23
71
39
30
30
15
13
30
15
13
7
34
45

43
38
60
2
9

_______________________________

1. Where a range is presented, contracted capacity varies monthly for the duration of the PPA.
2. Kallpa executed 14 PPAs, two PPAs with each of the following seven entities: (i) Enel Distribución Perú S.A.A., (ii) Luz del Sur S.A.A., (iii) Edecañete S.A., (iv) Electrosur S.A., (v) Electro Sur

Este S.A.A., (vi) Sociedad Eléctrica del Sur Oeste S.A. and (vii) Electro Puno S.A.A. Each of Electrosur S.A. and Electro Puno S.A.A. assigned their PPAs to Hidrandina S.A. in August 2012 and in
October 2012, respectively. The 350 MW capacity represents the aggregate contracted capacity among these 14 PPAs.

114

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3. Kallpa executed 12 PPAs, two PPAs with each of the following six entities: (i) Enel Distribución Perú S.A.A., (ii) Luz del Sur S.A.A., (iii) Electrosur S.A., (iv) Electro Sur Este S.A.A., (v) Electro
Puno S.A.A. and (vi) Sociedad Eléctrica del Sur Oeste S.A. Electro Puno S.A.A. assigned its PPAs to Hidrandina S.A. in October 2012. The 210 MW capacity represents the aggregate contracted
capacity among these 12 PPAs.

4. Contracted capacity will be determined during the first six months of supply after the client begins operations. Minimum of 70 MW and maximum of 85 MW.
5. Represents capacity under three separate PPAs.
6. The terms of the IEC PPA provide OPC-Rotem with the option to allocate and sell the generated electricity of the power station directly to end users. OPC-Rotem has exercised this option and sold
all of its energy and capacity directly to 28 end users as of December 31, 2016, who primarily consist of Israeli industrial companies, such as Granit Group. OPC-Rotem has entered into PPAs with
end users which cover a range of 4 MW to 107 MW of capacity, with each PPA covering, on average, 23 MW of capacity. As of December 31, 2016, the weighted average remaining life of OPC-
Rotem’s PPAs with end users based on firm capacity is approximately six years. For further information on the IEC PPA, see “— Regulatory, Environmental and Compliance Matters—Regulation
of the Israeli Electricity Sector .”

7. The contracted capacity of the PPA with Hadera Paper will increase to 40 MW upon the completion of the OPC-Hadera project, which is expected to commence commercial operations in early

2019.

Distribution Customers

For further information on the customers within IC Power’s distribution business, see “— Distribution Operations —Energuate—Customer Base .”

IC Power’s Raw Materials and Suppliers

IC Power’s power facilities utilize natural gas, hydroelectric, HFO, diesel, wind or a combination of these energy sources. The price volatility, availability and purchase price of these materials

(other than wind and water) depend upon the specific fuel and the market in which the fuel is to be used.

Kallpa, IC Power’s largest asset, is party to several supply agreements, including long-term natural gas supply agreements and transportation services agreements that are material to its

operations. While Nejapa and CEPP purchase the HFO necessary for their operations in the El Salvador and Dominican spot markets, respectively, JPPC, Nejapa, Corinto, Tipitapa and Puerto Quetzal
purchase the HFO necessary for their operations from several fuel suppliers in connection with long-term supply agreements. The sole provider of natural gas in Bolivia is a government-owned company.
Therefore, the terms for transmission and delivery of natural gas to COBEE are set by government decree.

Natural Gas Supply and Transportation Agreements

Kallpa purchases its natural gas requirements for its generation facilities from the Camisea Consortium, pursuant to a natural gas supply agreement. Under this agreement, the Camisea

Consortium has agreed to supply Kallpa’s natural gas requirements, subject to a daily maximum amount, and Kallpa has agreed to acquire natural gas exclusively from the Camisea Consortium. The
Camisea Consortium is obligated to provide a maximum of 4.3 million cubic meters of natural gas per day to Kallpa’s plant and Kallpa is obligated to purchase a minimum of 2.2 million cubic meters of
natural gas per day. Should Kallpa fail to consume the contractual minimum volume on any given day, it may make up the consumption volume shortage on any day during the following 18 months. The
price that Kallpa pays to the Camisea Consortium for the natural gas supplied is based upon a base price in U.S. Dollars set on the date of the agreement, indexed each year based on two producer price
indices: Fuels and Related Products Power Index and Oil Field and Gas Field Machinery Index, with discounts available based on the volume of natural gas consumed. This agreement expires in June
2022. For information on the risks related to Kallpa’s inability to renew, extend or replace this agreement prior to its expiration, see “ Risk Factors—Risks Related to IC Power—Risks Related to IC
Power’s Generation Business—Supplier concentration may expose IC Power to significant financial credit or performance risk, particularly with respect to those agreements which may expire during
the life of its power plants .”

Kallpa’s natural gas transportation services are rendered by TGP, pursuant to a natural gas firm transportation agreement and an interruptible gas transportation agreement. In April 2014, the
firm transportation agreement was further modified to include the transportation agreement between Duke Energy Egenor S. en C. por A. and Las Flores. These agreements expire in December 2033.
Additionally, Kallpa is party to two additional natural gas transportation agreements that expire in April 2030 and April 2033, respectively.

Additionally, on April 1, 2014, Kallpa entered into an agreement with TGP to cover the period up to the completion of the expansion of TGP’s pipeline facilities.

115

 
 
 
 
 
 
 
 
 
 
Set forth below is a summary of the natural gas transportation services under these two agreements (in cubic meters of gas per day):

Periods

Initial Date of Dispatch up to pipeline expansion
April 22, 2016 - March 20, 2020
March 20, 2020 - January 1, 2021
January 2, 2021 - March 31, 2030
April 1, 2030 - March 31, 2033
April 1, 2033 - December 31, 2033

Firm
3,474,861
4,854,312
4,655,000
4,655,000
3,883,831
2,948,831

Interruptible
1,329,593
764,463
764,463
530,000
1,301,169
1,301,169

Natural gas distribution services are rendered by Cálidda, under a natural gas distribution agreement. Under such agreement, which expires on December 31, 2033, Cálidda is obliged to

distribute up to approximately 3.71 million cubic meters of natural gas per day to Kallpa.

OPC-Rotem purchases natural gas from the Tamar Group, composed of Noble Energy Mediterranean Ltd., Delek Drilling Limited Partnership, Isramco Negev 2 Limited Partnership, Avner Oil
Exploration Limited Partnership, Dor Gas Exploration Limited Partnership and Everest Infrastructures Limited Partnership, or collectively, the Tamar Group, pursuant to a natural gas supply agreement.
Under this agreement, the Tamar Group has agreed to supply OPC-Rotem’s natural gas requirements, subject to a contractual maximum amount of 10.6 billion cubic meters. OPC-Rotem’s agreement
with the Tamar Group provides for the curtailment of OPC-Rotem’s gas supply in the event of insufficient gas supply, and provides that certain other Tamar Group customers have priority over OPC-
Rotem for supply and may therefore not be curtailed even if OPC-Rotem were curtailed.

The price that OPC-Rotem pays to the Tamar Group for the natural gas supplied is based upon a base price in New Israeli Shekels set on the date of the agreement, indexed to changes in the

“Production Cost” tariff, which is part of the “Time of Use” tariff and the U.S. Dollar representative exchange rate. As a result, increases or decreases in the EA’s generation tariff have a related effect on
OPC-Rotem’s cost of sales and margins. In addition, the natural gas price formula in OPC-Rotem’s supply agreement is subject to a floor mechanism. As a result of previous declines in the PUAE’s
generation component tariff, OPC-Rotem began to pay the ultimate floor price in November 2015. Therefore, the September 2015 and January 2017 declines, which reduced the EA generation
component tariff by approximately 12% and 0.5%, respectively and any further declines in the EA generation component tariff, will not result in a corresponding decline in OPC-Rotem’s natural gas
expenses, and may therefore lead to a greater decline in OPC-Rotem’s margins, which may have a material adverse effect on OPC-Rotem’s business, results of operations and financial condition. For
information on the risks associated with the impact of the EA’s generation tariff on OPC-Rotem’s supply agreement with the Tamar Group, see “ Item 3.D Risk Factors—Risks Related to IC Power’s
Generation Business—The profitability of IPPs in Israel may be adversely affected by changes in Israel’s regulatory costs and EA tariffs. ”

OPC-Rotem’s agreement with the Tamar Group expires upon the earlier of June 2029 or the date on which OPC-Rotem consumes the entire contractual capacity. For information on the Israeli

Natural Gas Council’s resolution regarding the pro rata distribution of natural gas in the event of gas shortages in Israel, see “ —Regulatory, Environment and Compliance Matters—Regulation of the
Israeli Electricity Sector .”

The Israel National Gas Council regulates the usage of capacity and supply of the natural gas pipeline from the Tamar rig in case of a shortage of capacity of the gas pipeline, and its regulation

differs from the provision included in OPC-Rotem’s agreement with the Tamar Group. IC Power believes that the pro-rata mechanism stipulated in the Gas Authority Resolution may increase the gas
volume delivered to OPC-Rotem pursuant to OPC-Rotem’s agreement with the Tamar Group in the event of gas pipeline capacity shortages. The manner in which the Gas Authority Resolution would be
implemented, if at all and, if implemented, its potential effect on OPC-Rotem’s agreement with the Tamar Group, if any, remains unknown. The Tamar Group has recently notified OPC-Rotem that as of
September 30, 2020, OPC-Rotem's gas supply will be available on a firm, non-interruptible basis.

HFO and Diesel Supply

IC Power’s operating companies that rely on HFO and diesel obtain their supply of HFO and diesel either through acquisitions on the spot market or pursuant to short- to medium-term supply

agreements. The supply agreements that IC Power’s operating companies enter into for HFO and diesel are generally linked to the Platts, McGraw Hill Financial Index.

IC Power’s Competition

IC Power’s major competitors in the Latin American and Caribbean countries in which its generation companies operate are generally the large international power utility corporations operating

in these countries. Local competitors also exist in each of these countries and account for varying market shares, depending upon the country of interest.

116

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Set forth below is a discussion of competition among power generation companies in certain of IC Power’s markets of operation. For further information on competition within IC Power’s

distribution business, see “ —Distribution Operations—Energuate—Guatemala Distribution Service Providers.”

Peru

In Peru, power generation companies compete along a number of dimensions, including the ability to (i) source and enter into long-term PPAs with power purchases, (ii) source and secure land
for the development or expansion of additional power generation plants, (iii) source and secure natural gas to fuel power generation stations, (iv) win tenders by the Peruvian government to build cold, or
other generation supply, reserve plants, and (v) maintain or increase market share in the growing Peruvian electricity market, particularly in connection with the balance of energy supply and demand
within Peru. In Peru, IC Power competes with state-owned generation companies (although their relative weight in the market has been diminishing over time since the privatization process started in the
1990s), as well as large international and domestic private generators.

The following table sets forth the quantity of energy generated by each of the principal generation companies in Peru for the periods presented:

2016

Market 
Share 
(%)

(GWh)

6,811 
8,832 
8,182 
6,644 
2,423 
15,434 
48,326 

Gross Energy Generation
For the Year Ended December 31,
2015

14.09 
18.28 
16.93 
13.75 
5.01 
31.94 
100 

(GWh)

5,166 
8,370 
7,172 
7,172 
2,648 
14,012 
44,540 

Market 
Share 
(%)

11.60 
18.79 
16.10 
16.10 
5.95 
31.46 
100.0 

2014

Market 
Share 
(%)

(GWh)

5,920 
8,848 
7,098 
7,041 
2,534 
10,351 
41,792 

14.17 
21.17 
16.98 
16.85 
6.06 
24.77 
100.0 

Company
IC Power (Kallpa, Samay I and CDA) 
Enel Generación Perú S.A.A. 1 
Engie Energía Perú S.A. (formerly EnerSur S.A.) 
Electroperú S.A. (a state-owned generation company) 
Orazul Energy Egenor 2 
Other generation companies 
Total 

________________________

1.
2.

Includes Enel Generación Perú and Chinango S.A.C.
Includes Egenor and Termoselva S.R.L.

Israel

Within Israel, IC Power’s major competitors are IEC and private power generators, such as Dorad Energy Ltd. and Dalia, who, as a result of recent government initiatives encouraging

investments in the Israeli power generation market, have constructed, and are constructing, power stations with significant capacity.

Until OPC-Rotem reached COD in July 2013, IEC operated as the sole large-scale provider of electricity in Israel. In May 2014, Dorad Energy Ltd. became the second IPP to reached COD in
Israel, adding a capacity of 860 MW to the Israeli electric market. In 2015, the power plant of Dalia reached COD, adding 910 MW to the Israeli electric market. Several other IPPs are in the process of
constructing power plants, and are expected to reach COD in the coming years. As of the date of this annual report, IEC has not published generation and energy and capacity sales information for IPPs.

Nicaragua

The electricity market in Nicaragua is served by a variety of generation companies, including (1) ICPNH, (2) ALBA de Nicaragua, S.A. (ALBANISA), (3) PENSA Proyecto Eléctrico de
Nicaragua, S.A, (4) Enel SpA and (5) Generadora de Occidente, Ltda. ICPNH competes with each of these companies for the right to supply capacity and energy to distribution companies and other non-
regulated customers as well as exports to SIEPAC.

117

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
The following table sets forth the quantity of energy generated by each of the principal generation companies in Nicaragua for the periods presented:

Company
ICPNH
ALBA de Nicaragua, S.A. (ALBANISA)
PENSA Proyecto Eléctrico de Nicaragua, S.A.
Enel SpA
Generadora de Occidente, Ltda.
Other generation companies
Total

Guatemala

2016

Market 
Share 
(%)

(GWh)

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

Market 
Share 
(%)

2014

Market 
Share 
(%)

(GWh)

978     
837     
476     
385     
372     
1,522     
4,574     

21.39     
18.31     
10.42     
8.43     
8.14     
33.31     
100.0     

1,095     
886     
451     
283     
370     
1,316     
4,401     

24.88     
20.13     
10.24     
6.42     
8.42     
29.91     
100.0     

1,099     
745     
430     
354     
266     
1,220     
4,114     

26.71 
18.11 
10.45 
8.60 
6.47 
29.65 
100.0 

The electricity market in Guatemala is served by a variety of generation companies, including (1) Puerto Quetzal, (2) El Instituto Nacional de Electrificación (INDE), (3) Energías San José

S.A., and (4) Orazul Energy Guatemala y Cia, S.C.A. Puerto Quetzal competes with each of these companies for the right to supply capacity and energy to distribution companies and other non-regulated
customers, as well as ancillary services to the grid. In addition, Puerto Quetzal competes directly, or through its trading arm Poliwatt Limitada, for the export of energy and capacity to various countries
in SIEPAC.

The following table sets forth the quantity of energy generated by each of the principal generation companies in Guatemala for the periods presented:

2016

Market 
Share 
(%)

(GWh)

364 
1,537 
1,163 
696 
7,131 
10,891 

Gross Energy Generation
For the Year Ended December 31,
2015

3.35 
14.13 
10.69 
6.40 
65.55 
100.0 

(GWh)

673 
1,969 
1,045 
675 
5,940 
10,302 

Market 
Share 
(%)

6.53 
19.11 
10.14 
6.55 
57.66 
100.0 

2014

Market 
Share 
(%)

(GWh)

490 
3,159 
970 
872 
5,007 
10,498 

4.67 
30.09 
9.24 
8.31 
47.69 
100.0 

Company
Puerto Quetzal 
El Instituto Nacional de Electrificación (INDE) 
Energías San José, S. A. 
Orazul Energy Guatemala y Cia S.C.A. 
Other generation companies 
Total 

El Salvador

The electricity market in El Salvador is served by a variety of generation companies, including (1) Nejapa, (2) Comisión Ejecutiva Hidroeléctrica del Río Lempa, a state-owned generation

company whose primary generation facilities are hydroelectric plants, (3) LaGeo S.A. de C.V., a state-owned generation company whose primary generation facilities are geothermal plants, (4) Orazul
Energy, (5) Inversiones Energéticas, S.A. de C.V., and (6) Termopuerto, S.A. de C.V. Nejapa competes with each of these companies for the right to supply capacity and energy to distribution companies
and other non-regulated customers, as well as for exports to SIEPAC.

118

 
   
     
     
     
     
     
 
 
 
 
 
 
 
 
 
   
   
 
 
   
   
   
   
   
 
   
   
   
   
   
   
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth the quantity of energy generated by each of the principal generation companies in El Salvador for the periods presented:

Company
Nejapa
Comisión Ejecutiva Hidroeléctrica del Río Lempa
LaGeo S.A. de C.V.
Orazul Energy
Inversiones Energéticas, S.A. de C.V.
Termopuerto, S.A. de C.V.
Other generation companies
Total

Panama

2016

Market 
Share 
(%)

(GWh)

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

Market 
Share 
(%)

2014

Market 
Share 
(%)

(GWh)

387     
1,258     
1,467     
1,002     
440     
463     
464     
5,481     

7.07     
22.94     
26.77     
18.29     
8.03     
8.45     
8.45     
100.0     

440     
1,349     
1,432     
853     
491     
493     
465     
5,523     

7.97     
24.43     
25.93     
15.43     
8.89     
8.93     
8.42     
100.0     

376     
1,718     
1,558     
821     
574     
476     
667     
6,190     

6.08 
27.76 
25.17 
13.26 
9.27 
7.69 
10.77 
100.0 

The electricity market in Panama is served by a variety of generation companies, including (1) Kanan, (2) Pedregal, (3) ACP, (4) AES Panamá, S.R.L, (5) Celsia SA ESP and (6) Enel Fortuna,

S.A. Kanan and Pedregal compete with each of these companies for the right to supply capacity and energy to distribution companies and other non-regulated customers, as well as for exports to
SIEPAC.

The following table sets forth the quantity of energy generated by each of the principal generation companies in Panama for the periods presented:

Company
IC Power (Kanan and Pedregal)  
ACP   
AES Panamá, S.R.L.  
Celsia SA ESP  
Enel Fortuna, S.A.  
Other hydros   
Other thermal   
Solar & wind  
EOR  
Total   

Bolivia

2016

(GWh)

433 
723 
2,777 
1,477 
1,353 
2,223 
971 
688 
28 
10,673 

  Market Share (%)  
4.06 
6.77 
26.02 
13.84 
12.68 
20.83 
9.10 
6.44 
0.26 
100.0 

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

356 
828 
2,497 
1,444 
1,658 
1,777 
1,047 
428 
17 
10,052 

  Market Share (%) 
3.31 
7.70 
23.22 
13.43 
15.42 
16.53 
9.74 
3.97 
0.16 
100.0 

2014

(GWh)

Market 
Share (%)

405 
1,029 
1,993 
1,565 
1,130 
1,473 
1,311 
189 
108 
9,203 

4.40 
11.18 
21.66 
17.00 
12.28 
16.00 
14.25 
2.05 
1.17 
100.0 

The electricity market in Bolivia is primarily served by a variety of generation companies, including COBEE, Guaracachi, Valle Hermoso and Corani.

The following table sets forth the quantity of energy generated by each of the principal generation companies in Bolivia for the periods presented:

Company
COBEE   
Guaracachi   
Valle Hermoso  
Corani   
Other generation companies  
Total   

Chile (SIC)

(GWh)

2016

  Market Share (%)  
10.1 
19.6 
13.5 
6.6 
50.0 
100.0 

889 
1,721 
1,787 
580 
4,382 
9,359 

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

  Market Share (%) 
12.97 
23.98 
12.84 
11.25 
38.96 
100.0 

1,081 
1,999 
1,070 
938 
3,247 
8,335 

(GWh)

2014

  Market Share (%) 
13.86 
26.52 
18.59 
11.78 
29.25 
100.0 

1,086 
2,078 
1,457 
923 
2,292 
7,83 6 

The electricity market in Chile is served by a variety of generation companies, including (1) Central Cardones, (2) Colmito, (3) Endesa and (4) Colbún. We compete in the SIC system, Chile’s
largest power system, with each of these companies for the right to supply capacity and energy to distribution companies and other non-regulated customers. A transmission line is under construction to
connect the SIC with SING, Chile’s second largest power system. Once completed, we also expect to compete with power plants in the SING system.

119

 
   
     
     
     
     
     
 
 
 
 
 
 
 
 
 
   
   
 
 
   
   
   
   
   
 
   
   
   
   
   
   
   
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth the quantity of energy generated by each of the principal generation companies in SIC for the periods presented:

Company
IC Power (Colmito and Central Cardones)  
Endesa S.A.  
Colbún S.A.   
AES Gener S.A.  
Empresa Eléctrica Guacolda S.A.   
Empresa Eléctrica Pehuenche S.A.  
Other generation companies  
Total   

Dominican Republic

2016

(GWh)

8 
13,460 
10,141 
5,774 
4,775 
2.365 
17,382 
53,905 

  Market Share (%)  
0.02 
24.97 
18.81 
10.71 
8.86 
4.39 
32.24 
100.0 

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

31 
11,759 
11,805 
5,047 
4,548 
2,980 
16,731 
52,901 

  Market Share (%) 
0.06 
22.23 
22.32 
9.54 
8.60 
5.63 
31.63 
100.0 

2014

(GWh)

6 
12,312 
12,170 
5,296 
4,889 
3,006 
14,531 
52,210 

  Market Share (%) 
0.01 
23.58 
23.31 
10.14 
9.36 
5.76 
27.83 
100.0 

The power and electricity market in the Dominican Republic is served by a variety of generation companies, including (1) CEPP, (2) affiliates of AES Corp., which own one combined-cycle

plant fueled by natural gas and two open-cycle plants fueled by natural gas, as well as equity interests in two plants fueled with coal, (3) Empresa de Generación Hidroeléctrica Dominicana, a state-
owned generation company whose primary generation facilities are hydroelectric plants, (4) Empresa Generadora de Electricidad Haina, S.A., (5) Compañía de Electricidad de San Pedro de Macorís, (6)
Gas Natural SDG, S.A. (Gas Natural Fenosa), (7) Transcontinental Capital Corp. (Bermuda) Ltd (Seaboard), and (8) Consorcio Laesa Ltd. CEPP competes with each of these companies for the right to
supply capacity and energy to distribution companies and other non-regulated customers.

The following table sets forth the quantity of energy generated by each of the principal generation companies in the Dominican Republic for the periods presented:

Company
CEPP  
Affiliates of AES Corp.   
Empresa de Generación Hidroeléctrica Dominicana  
Empresa Generadora de Electricidad Haina, S.A.  
Compañía de Electricidad de San Pedro de Macorís   
Gas Natural SDG, S.A. (Gas Natural Fenosa)  
Transcontinental Capital Corp. (Bermuda) Ltd
(Seaboard)
Consorcio Laesa Ltd   
Other generation companies  
Total   

Colombia

(GWh)

264 
5,727 
1,545 
2,766 
1,116 
989 

888 
583 
1,552 
15,430 

2016

  Market Share (%)  
1.71 
37.12 
10.01 
17.92 
7.23 
6.41 

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

  Market Share (%) 
1.99 
35.48 
17.96 
6.72 
6.23 
6.76 

298 
5,311 
2,688 
1,006 
934 
1,012 

(GWh)

2014

  Market Share (%) 
1.80 
40.40 
9.35 
20.27 
0.84 
6.82 

242 
5,443 
1,260 
2,731 
113 
919 

5.76 
3.78 
10.06 
100.0 

842 
612 
2,287 
14,990 

5.62 
4.09 
15.28 
100.0 

1,006 
471 
1,285 
13,470 

7.47 
3.50 
9.54 
100.0 

The electricity market in Colombia is served by a variety of generation companies, including (1) Surpetroil, (2) Empresas Públicas de Medellín E.S.P, (3) Emgesa S.A. E.S.P, (4) Isagen S.A.

E.S.P and (5) Generadora y Comercializadora de Energía del Caribe S.A. E.S.P. Surpetroil competes with each of these companies for the right to supply energy and reliability to distribution companies
and other non-regulated customers. Surpetroil also competes in the off-grid generation market.

120

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth the quantity of energy generated by each of the principal generation companies in Colombia for the periods presented:

Company
Surpetroil 1 
Empresas Públicas de Medellín E.S.P 
Emgesa E.SP 
Isagen S.A. E.SP 
Generadora y Comercializadora de Energía del Caribe

S.A. E.S.P.

Other generation companies 
Total 

_______________________

2016

(GWh)

2 
13,409 
15,005 
11,392 

3,181 
22,953 
65,942 

  Market Share (%)  
— 
20.33 
22.75 
17.28 

4.83 
34.81 
100.0 

Gross Energy Generation
For the Year Ended December 31,
2015

(GWh)

43 
13,994 
13,749 
12,821 

6,972 
18,970 
66,549 

  Market Share (%) 
0.06 
21.03 
20.66 
19.27 

10.48 
28.51 
100.0 

2014

(GWh)

23 
13,626 
13,691 
10,609 

7,508 
18,871 
64,328 

  Market Share (%) 
0.04 
21.18 
21.28 
16.49 

11.67 
29.34 
100.0 

1. Reflects energy sales in the Colombian interconnected system.

IC Power’s Seasonality

Within the Latin American and the Caribbean countries in which IC Power operates, power is generally generated by hydroelectric or thermal power stations. The hydroelectric stations are an

efficient source of power generation due to the cost savings of fuel associated with thermal power generation. The power generated by these hydroelectric power stations varies in accordance with the
rainy seasons and rainfall patterns of each country in each year. For example, greater amounts of hydroelectric power are dispatched between November and April in Peru—the Peruvian rainy season—
than between May and October, when the volumes of rainfall declines and operators have less water available for electricity generation in the reservoirs serving their plants. During periods of lesser
rainfall, greater volumes of thermoelectric power are dispatched. Therefore, Kallpa provides IC Power’s Peruvian generation segment with a hedge during drier periods (in which less hydroelectric
power is generally dispatched), while CDA provides IC Power’s Peruvian generation segment with a hedge during the rainy season (in which less thermoelectric power is generally dispatched).

Furthermore, IC Power’s Nicaraguan assets which rely on wind generate less volume of power during the Nicaraguan rainy season between May and October, as those months tend to
experience less wind. Accordingly, IC Power’s revenues are subject to seasonality, the effects of rainfall, and the type of energy generated in each country of operation (whether hydroelectric or thermal,
and whether generated using natural gas, HFO or diesel). Although IC Power acts to reduce this exposure to seasonality by contracting long-term PPAs for most of its capacity, this effect cannot be
completely neutralized.

Within Israel, electricity demand is sensitive to temperatures and tends to be greater in the summer season (July to August) because of the use of air conditioners and in the winter season
(December to February) because of the use of heating devices, as compared with the other months of the year. As a result, the tariffs in the winter and summer seasons are higher than those in the
transition seasons, making Israeli power generators, such as OPC-Rotem, more profitable, generally, in the winter and summer months, as compared to other months of the year. These seasonal increases
are partially offset by an increase in fuel costs during those periods. For further information on the seasonality of tariffs in Israel, see “ —Industry Overview—Overview of Electricity Generation Industry
—Israel. ”

For further information on the seasonality within IC Power’s distribution business, see “ —Distribution Operations—Seasonality .”

IC Power’s Property, Plants and Equipment

The following table provides certain information regarding IC Power’s power plants that are owned or leased, as of December 31, 2016:

Company/Plant

Peru Segment

Kallpa:

Location

Operating Companies

Installed Capacity
(MW)

Fuel Type

Kallpa I, II, III and IV 

  Chilca district, Peru

870  Natural gas (combined cycle)

Las Flores 

  Chilca district, Peru

Kallpa Total

Samay I 
CDA 

Israel Segment

OPC-Rotem 
OPC-Hadera 1 

  Mollendo, Peru
  Huancavelica, Peru

  Mishor Rotem, Israel
  Hadera, Israel

121

193  Natural gas

1,063 

632  Diesel and natural gas
545  Hydroelectric

440  Natural gas and diesel (combined cycle)

18  Natural gas

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Location

Installed Capacity
(MW)

Fuel Type

Company/Plant

Central America Segment

ICPNH

Corinto 2 
Tipitapa Power 
Amayo I 
Amayo II 3 

ICPNH Total 

Puerto Quetzal 

Nejapa 

Kanan 4 

Other Segment

CEPP 

COBEE:

Zongo Valley plants:
Zongo 
Tiquimani 
Botijlaca 
Cutichucho 
Santa Rosa 
Sainani 
Chururaqui 
Harca 
Cahua 
Huaji 

Miguillas Valley plants:
Miguillas 
Angostura 
Choquetanga 
Carabuco 

  Chinandega, Nicaragua
  Managua, Nicaragua
  Rivas, Nicaragua
  Rivas, Nicaragua

  Escuintla, Guatemala

  Nejapa, El Salvador

  Colon, Panama

  Puerto Plata, Dominican Republic

  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia
  Zongo Valley, Bolivia

  Miguillas Valley, Bolivia
  Miguillas Valley, Bolivia
  Miguillas Valley, Bolivia
  Miguillas Valley, Bolivia

El Alto-Kenko 

  La Paz, Bolivia

COBEE Total 

Central Cardones 

Colmito 

JPPC 

Surpetroil

La Hocha 
Purificación 
Entrerios 
Geopark 

Surpetroil Total 

________________________

  Copiapó, Chile

  Concón, Chile

  Kingston, Jamaica

  Huila, Colombia
  Tolima, Colombia
  Casanare, Colombia
  Casanare, Colombia

71  HFO
51  HFO
40  Wind
23  Wind

185 

179  HFO

140  HFO

92  HFO

67  HFO

11  Hydroelectric
9  Hydroelectric
7  Hydroelectric
23  Hydroelectric
18  Hydroelectric
10  Hydroelectric
25  Hydroelectric
26  Hydroelectric
28  Hydroelectric
30  Hydroelectric

187 

4  Hydroelectric
6  Hydroelectric
6  Hydroelectric
6  Hydroelectric

22 

19  Natural gas

228 

153  Diesel

58  Natural gas and diesel

60  HFO

2  Natural gas
10  Natural gas
3  Natural gas
16  Natural gas

31 

1. OPC-Hadera also holds a conditional license for the construction of a cogeneration power station in Israel, based upon a plant with 140 MW of capacity. Construction commenced in June 2016 and

2.

COD is expected by early 2019.
In March 2016, a unit of ICPNH’s barge-mounted power plant (Corinto) sustained damage in connection with a machinery breakdown. The relevant unit has an installed capacity of 18 MW, and
represents 25% of all IC Power’s installed capacity at the Corinto plant. This event is covered by insurance. The relevant unit came back on-line in February 2017.

3. Wind farm complex sustained damage in December 2014 in connection with a blackout in the Nicaragua’s National Interconnection System, which left one wind turbine collapsed and another two
wind turbines with severe damage. In early 2016, the three damaged turbines, which represented 10% of all of IC Power’s installed capacity at its Amayo I and Amayo II plants, were replaced and
re-commenced commercial operations.
In April 2017, Kanan experienced a fire, and as a result of the fire, both its 55 MW and 37 MW barges were placed off-line. For further information on the incident, see “ Item 5. Operating and
Financial Review and Prospects—Recent Developments—IC Power—Fire at Kanan Plant .”

4.

In addition:

·

·

Cenérgica owns three fuel storage tanks on site with an aggregate capacity of 240,000 barrels and maintains a fuel depot and marine terminal located on a 6.5 hectare site that IC Power
leases in Acajutla, El Salvador;

IC Power was awarded a tender published by the Chilean government for a lease of land in Northern Chile, which is intended for the construction of a power station with a capacity of at
least 350 MW; and

122

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

IC Power was awarded a tender published by the Israel Land Authority to lease an approximately 592,000 square foot plot adjacent to the OPC-Rotem site, which can be utilized to extend
OPC-Rotem’s capacity in Israel.

For further information regarding IC Power’s plants, see “ —IC Power’s Description of Operations .”

IC Power believes that it has satisfactory title to its plants and facilities in accordance with standards generally accepted in the electric power industry, other than title to certain land on which

CEPP’s facilities are located.

For a discussion of Energuate’s property, plant and equipment, see “ —Distribution Operations—Energuate—Distribution Network .”

IC Power leases its principal executive offices in Lima, Peru and various other office space in the markets that it serves. IC Power owns all of its production facilities, other than Las Flores

power plant. IC Power leases Las Flores facility under a capital lease as described in “ Item 5.B—Liquidity and Capital Resources—IC Power’s Liquidity and Capital Resources—IC Power’s Material
Indebtedness—Las Flores Lease. ”

IC Power believes that all of its production facilities are in good operating condition. As of December 31, 2016, the consolidated net book value of IC Power’s property, plant and equipment

was $3,510 million.

Maintenance and Spare Parts

IC Power’s operating subsidiaries regularly perform comprehensive maintenance on their facilities, including maintenance to turbines, engines, generators, transformers, the balance of plant and
substations, as well as civil works maintenance. Maintenance is typically performed according to a predefined schedule at fixed intervals, based on running hours or otherwise according to manufacturer
or engineering specifications. Maintenance is either performed by IC Power’s trained employees, or is outsourced to third party contractors. In some cases, IC Power’s operating subsidiaries have entered
into long-term service agreements for their maintenance.

Each of IC Power’s operating subsidiaries has arrangements to obtain spare parts, as necessary. IC Power’s operating subsidiaries generally purchase their spare parts from the OEMs, as well as

from other suppliers. In some cases, these operating subsidiaries have entered into long-term supply contracts for spare parts.

For a discussion of maintenance services received by Energuate, see “— Distribution Operations—Energuate—Transmission, Construction and Maintenance Services .”

Insurance

IC Power carries insurance for its plants against material damage and consequent business interruption through comprehensive “all-risks” insurance policies. These all-risk insurance policies

provide for total replacement values of $3.8 billion for property damage and $777 million for business interruption and are renewed annually, with the most recent renewal occurring in January 2017. In
some cases, IC Power relies on insurance policies in the event that any of its plants sustain damages or experience business interruptions as a result of the actions of, or a breach under the relevant
agreement by, suppliers, customers or other third parties whose liability obligations are contractually limited. IC Power’s insurance coverage is underwritten by some of the largest international
reinsurance companies, including Mapfre S.A., Munich Re, Zurich Insurance Group Ltd, ACE Limited, American International Group, Inc., Allianz SE and Swiss Re Ltd, among others.

The material damage insurance for IC Power’s operations provides insurance coverage for losses due to accidents resulting from fire, explosion and machinery breakdown, among others. This

coverage has a maximum indemnification limit of $600 million per event (combined material damage and business interruption coverage). These policies have deductibles of up to $2 million, depending
on the plant.

The business interruption coverage under each of these policies provides insurance for losses resulting from interruptions due to any material damage covered by the policy. The losses are

covered until the plant production is fully re-established, with maximum indemnity periods ranging from 12 to 30 months.

IC Power carries insurance for CDA to protect against certain risks associated with this project. IC Power carries a (1) construction all-risk policy with a limit of $679 million, (2) consequent

delay in start-up policy with a limit of $180 million with a 24-month indemnity period, and (3) third-party liability policy with a limit of $25 million.

123

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Additionally, IC Power carries a property damage and business interruption insurance policy for Samay I to protect against risks of direct physical loss or damage due to machinery breakdown,

earthquake and the other main risks associated with the operation of the Samay I plant. Coverage includes (1) property damage with a limit of $294 million and (2) business interruption with an 18-
month indemnity period with a limit of $73 million. Additionally, IC Power has third party liability and terrorism insurance policies, covering (1) third-party liability with a limit of $50 million and (2)
terrorism with a limit of $150 million. In July 2016, all four of Samay I’s units were declared unavailable to the system. By February 2017, all four of the units had been declared available to the system.
The cost of the repairs was paid by the EPC contractor. To the extent IC Power is required to incur costs relating to the outage, including repair costs and loss of profits, IC Power intends to seek
coverage from the EPC contractor and/or the insurance coverage (subject to deductibles).

IC Power does not anticipate having any difficulties in renewing any of its insurance policies and believes that its insurance coverage is reasonable in amount and consistent with industry

standards applicable to energy generation companies operating in the same markets.

Employees

As of December 31, 2016, IC Power had a total of 2,069 employees. Substantially all of IC Power’s employees are employed on a full-time basis, and are usually divided into one of the

following functions: plant operation and maintenance, administrative support, corporate management, budget and finance, legal and project management.

The table below sets forth breakdown of employees by main category of activity and by segment as of the dates indicated:

Number of employees by category of activity:
Plant operation and maintenance  
Administrative support   
Corporate management, budget and finance   
Other, including project management   
Total   
Number of employees by segment:
Generation   
Peru  
Israel  
Central America   
Other   
Distribution   
Total   
_____________________________________________________

2016

As of December 31,
2015 1

2014 1

1,489 
484 
48 
48 
2,069 

1,309 
250 
82 
385 
592 
760 
2,069 

879 
317 
38 
72 
1,306 

1,306 
230 
66 
386 
624 
— 
1,306 

842 
310 
33 
50 
1,235 

1,235 
182 
61 
443 
549 
— 
1,235 

1

Does not include Energuate’s employees, as we acquired Energuate in January 2016. For further information on Energuate’s employees, see “— Distribution Operations—Employees .”

From time to time, Energuate contracts for the service of temporary employees. As of December 31, 2016, IC Power did not employ a material number of temporary employees.

For a discussion of Energuate’s employees, see “ —Distribution Operations—Energuate—Employees .”

As of December 31, 2016, approximately 31% of IC Power’s employees were unionized, representing a significant portion of its employees in Israel, Guatemala, Bolivia and Jamaica. As of

December 31, 2016, approximately 38% of OPC-Rotem’s employees were represented by Histadrut Labor Federation, the general federation of labor in Israel, approximately 62% of Energuate’s
employees were unionized and were members of one of four labor unions, approximately 62% of COBEE’s employees were represented by the Sindicato Unico de Trabajadores de Luz y Fuerza COBEE
and approximately 27% of JPPC’s employees were represented by Union of Technical Administrative and Supervisory Personnel. We negotiate a collective bargaining with each union on an annual
basis. In June 2015, COBEE’s facilities in Bolivia experienced a brief strike, which did not result in a work stoppage and did not have a material effect on IC Power’s operations.

As IC Power’s operations are subject to various hazards, IC Power’s management places a high priority on, and closely monitors, the health and safety of its employees. IC Power has installed

policies, procedures and training programs to reduce workplace accidents at each of its operating companies.

Additionally, IC Power has a competitive compensation structure for its employees and the managers of each of its operating subsidiaries. Compensation for such managers typically consists of

a base salary, as well as a year-end bonus, which is based on the personal performance of the manager and the performance of the relevant operating subsidiary.

124

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Shareholders’ Agreements

IC Power holds a majority stake in most of its operating companies—Kallpa, OPC-Rotem, CEPP, Central Cardones, Surpetroil, Corinto, Tipitapa Power, Amayo I, Amayo II, CDA, Samay I,

DEORSA and DEOCSA—and a non-controlling interest in Pedregal. The operations of these companies are subject to shareholders’ and/or member agreements. Although the terms of each of these
shareholder and member agreements vary, they generally provide, in certain circumstances and subject to certain conditions: (1) each shareholder with the right to elect a specified number of directors
and/or appoint specified executive officers; (2) for the distribution of dividends in proportion to each shareholder’s equity interest; (3) the minority shareholder with veto rights with respect to significant
corporate actions ( e.g. , mergers, share issuances, the amendment of governing documents, and the entry into PPAs or other contracts in excess of a specified value) and certain approval protocol with
respect to the budget of the relevant company; (4) each party with a right of first refusal with respect to any potential sale of equity interests in the relevant company; and (5) specifications of additional
equity contributions, if any.

Additionally, IC Power and Energía del Pacífico, the minority shareholder in each of Kallpa, Samay I, and CDA, have agreed that IC Power and Energía del Pacífico will each submit projects

related to generation or transmission of energy in Peru to Kallpa and will not develop such projects other than through Kallpa, unless both parties agree to incorporate a new investment vehicle.
Similarly, IC Power has provided tag-along rights to Mr. Yesid Gasca Duran, the minority shareholder in Surpetroil, with respect to any new projects which IC Power may develop or acquire in
Colombia.

Legal Proceedings

Set forth below is a discussion of a significant legal proceeding to which IC Power’s subsidiary is party. For further information on IC Power’s legal proceedings, see Note 20 to our financial

statements included in this annual report.

Energuate Tax Claims

In July 2016, the Guatemalan Tax Administrator, or the SAT, issued a claim against DEORSA and DEOCSA for back taxes for the years 2011 and 2012, alleging that these companies

improperly deducted interest and amortization of goodwill relating to the acquisition of these companies in 2011 by their prior owner in a leveraged buy-out.

As background, in February 2015, the SAT issued a binding tax opinion, or the Tax Opinion, confirming that such deductions were legitimate. The government of Guatemala changed in

January 2016. After the new government took power and despite the previous Tax Opinion, in July 2016, the SAT filed a complaint against DEORSA and DEOCSA that unilaterally reversed the Tax
Opinion. The complaint requested the payment of alleged back taxes, interest, and fines in relation to tax years 2011 and 2012 on the grounds that the structure of the 2011 acquisition was used to
generate tax deductions for interest and amortization of goodwill.

In August 2016, the court hearing the SAT complaint ordered DEORSA and DEOCSA to pay $6 million and $11 million, respectively, in alleged back taxes immediately, plus interest and
fines. In August 2016, DEORSA and DEOCSA paid $6 million and $11 million, respectively, for alleged back taxes for 2011 and 2012. In December 2016, following discussions with, and upon the
instruction of, the SAT, and in order to avoid other potential measures by the SAT, DEORSA and DEOCSA paid the SAT $10 million and $16 million, respectively, in full satisfaction of the interest and
fines payments assessed by the SAT in connection with the 2011 and 2012 tax claims.

In light of the SAT’s actions, and in order to avoid the initiation of complaints by the SAT concerning the tax years 2013, 2014 and 2015 and any resulting fines and interest, upon instruction of

the SAT, DEORSA and DEOCSA revised their tax returns for these years and paid $12 million and $20 million in August 2016, respectively, corresponding to alleged back taxes and interest for those
years. The total payments described above (covering 2011 through 2015) are in the amount of $74 million, representing the total amount demanded by the SAT, as well as DEORSA and DEOCSA’s
payments to the SAT with respect to the 2013, 2014 and 2015 tax years as described above. In addition, during 2016, DEORSA and DEOCSA made $5 million of advance income tax payments for taxes
relating to 2016.

DEORSA and DEOCSA are disputing the SAT’s claims and have made all payments subject to a broad reservation of rights, including but not limited to seeking restitution of such payments.

IC Power has recognized these payments as a non-current tax asset in its financial statements (recorded on its balance sheet as an income tax receivable). Furthermore, although DEORSA and DEOCSA
are pursuing legal remedies through the Guatemalan legal system to determine their ability to deduct interest and amortization relating to the 2011 acquisition, DEORSA and DEOCSA may not be able
to deduct such historical amounts or take similar deductions in the future. In light of the court orders referred to above, at this time, DEORSA and DEOCSA are not currently deducting interest and
amortization relating to the 2011 acquisition for income tax purposes. However, income tax payments made in relation to such items are being recorded as non-current tax receivables.

125

 
 
 
 
 
 
 
 
 
 
 
Kallpa—Import Tax Assessments

Since 2010, SUNAT has issued tax assessments to Kallpa and its lenders (as lessors under the Kallpa leases) for payment of import taxes allegedly owed by Kallpa and its lenders in connection
with the engineering services related to the EPC contractors of Kallpa I, II, III and IV. The assessments were made on the basis of the allegation that Kallpa and its lenders should have included the value
of the engineering services rendered by the contractor of the relevant project in the tax base of the imported equipment for the import taxes. Kallpa disagrees with these tax assessments on the grounds
that the engineering services rendered to design and build the power plant are not part of the value of the imported goods but a separate service for which Kallpa paid its corresponding taxes because all
such equipment, according to SUNAT’s allegation, could be deemed a plant with respect to the unit in connection with which it was imported. Kallpa and its lenders disputed the tax assessments before
SUNAT and, after SUNAT confirmed the assessments, appealed before the Tribunal Fiscal.

In January 2015, Kallpa and its lenders were notified that the Tribunal Fiscal had rejected their appeal in respect of the Kallpa I assessment. Kallpa and its lenders disagreed with the Tribunal
Fiscal’s decision and challenged this decision in the Peruvian courts. In order to challenge the Kallpa I ruling, Kallpa and its lenders were required to pay the tax assessment of Kallpa I in the aggregate
amount of approximately $12.3 million, which amount consists of the tax assessment for Kallpa I, plus related interest and fines. In April 2015, Kallpa and its lenders made the final payment (under
protest) regarding Kallpa I’s tax assessment in order to appeal the administrative ruling of the Tribunal Fiscal in the judicial system. Kallpa has reimbursed the lenders for each of the amounts due under
the terms and conditions set forth in the operation agreement dated July 31, 2008, as amended, by and among Citibank del Perú S.A., Citileasing S.A., Banco de Crédito del Perú, Scotiabank Perú, and
Kallpa. In September 2016, the court of first instance denied the challenge brought by Kallpa and its lenders in respect of the Tribunal Fiscal’s decision over the Kallpa I assessment. Kallpa and its
lenders appealed the decision in September 2016. To the extent that the appeal is successful, Kallpa and its lenders will be entitled to seek the return of the amounts paid to SUNAT. A decision of the
Tribunal Fiscal of the appeals in respect of the Kallpa II and III assessments is still pending.

In January 2016, SUNAT issued a ruling in favor of Kallpa, releasing Kallpa from substantially all claims and associated fines related to Kallpa IV, as SUNAT concluded that the Kallpa IV unit

could not be deemed a plant and therefore, the engineering services rendered in connection with the Kallpa IV project could not be incorporated into the value of the imported equipment. As of
December 31, 2016, the total tax exposure related to claims by SUNAT against Kallpa and its lenders in connection with the importation of equipment related to the Kallpa I, II, III and IV projects,
equaled S/79 million (approximately $24 million), including interest and fines.

SUNAT 2012 Income Tax Audit

On February 15, 2016, as a result of the 2012 income tax audit, SUNAT issued a preliminary income tax assessment against IC Power on the basis that certain interest accrued on IC Power’s

debt and some maintenance expenses amounting to approximately S/22 million (approximately $7 million) should not have been deducted from IC Power’s 2012 taxable income but rather treated as an
asset. On March 11, 2016, SUNAT issued a final tax assessment for approximately S/16.5 million (approximately $5 million), related to the interest expenses accrued during the construction of the steam
turbine (Kallpa IV) as part of the combined-cycle conversion of the plant. IC Power will appeal this assessment before SUNAT. As of December 31, 2016, Kallpa’s potential tax liability relating to this
assessment is S/12 million (approximately $3 million), including interest and fines.

Dispute with Tamar Group

OPC-Rotem is party to a gas supply and purchase agreement with the Tamar Group. Under the agreement, the price of the gas that OPC-Rotem purchases is linked to the EA’s generation

component tariff, which the EA revises from to time. In July 2013, the EA published four generation component tariffs/power cost indicators, ranging from NIS 386 per MWh to NIS 333.2 per MWh,
instead of the single tariff that had previously used. In January 2015, the EA published new tariffs, which further reduced tariff rates.

In connection with the indexation of the natural gas price formula for OPC-Rotem’s gas supply agreement with the Tamar Group, OPC-Rotem and the Tamar Group disagreed as to which of the

EA’s July 2013 tariffs applied to OPC-Rotem’s supply agreement, and have a similar disagreement with respect to the tariffs published in January 2015. In February 2017, OPC-Rotem received a letter
from the Tamar Group with respect to the dispute. The Tamar Group requested payment by OPC-Rotem of approximately $25 million (including accrued interest) in connection with the dispute, and has
requested that such amount be deposited in escrow pursuant to the gas supply agreement.

Regulatory, Environmental and Compliance Matters

In Latin America, Central America and the Caribbean, where IC Power primarily operates, the electricity market allows for sale and delivery of power from power generators (private or
government owned) to distribution companies (private or government owned) and to industrial (i.e., non-regulated) consumers. In these countries there is typically structural segregation of power
generation companies and transmission and distribution companies. In most of these countries there is a government-owned power grid and transmission services are provided on open access basis, i.e.
the transmission company must transmit power through the grid and in exchange, charges a transmission rate set by the supervisory authority or based on a competitive proceeding or regulated tariff.
Whereas in these markets private and government-owned entities compete for power generation, its transmission and distribution are conducted subject to exclusive franchises; therefore, the
transmission and distribution operations are regulated in markets in which IC Power operates.

126

 
 
 
 
 
 
 
 
 
 
 
 
In these countries, delivery and sale of power is subject to a regulatory regime (typical of privatized electricity markets) which includes supervision by an independent supervisory entity for the

electricity market. For further information on the regulatory risks related IC Power’s operations, see “ Item 3.D Risk Factors—Risks Related to IC Power—IC Power’s equipment, facilities, operations
and new projects are subject to numerous environmental, health and safety laws and regulations .”

Regulation of the Peruvian Electricity Sector

In Peru, power is generated by companies which primarily operate hydroelectric and natural gas based power stations. The general electricity laws in Peru form the statutory framework

governing the electricity market in Peru and cover, among other things:

·

·

·

generation, transmission, and distribution and trading of electricity;

operation of the energy market; and

generation prices, capacity prices and other tariffs.

All entities that generate, transmit or distribute power to third parties in Peru operate subject to the general electricity laws in Peru. Power generating companies in Peru, such as Kallpa, are

impacted by, among other things, regulation applicable to transmission and distribution companies.

Although significant private investment has been made in the electricity market in Peru and independent supervisory entities have been created to supervise and regulate the electricity market,

the State of Peru has remained, in actual fact, in the role of supervisor and regulator. In addition, the State of Peru owns multiple power generation and distribution companies in Peru, although their
market participation has diminished over time and face significant legal restrictions to engage in new projects or investments.

Regulatory Entities

There are five entities in charge of regulation, operation and supervision of the electricity market in Peru in general, and of IC Power’s operations in Peru, in particular:

MINEM —The Ministry of Energy and Mines, responsible for:

(a) setting national energy policy; (b) proposing and adopting laws and regulations to supervise the energy sector; (c) controlling expansion plans for SEIN; (d) approving proposed expansion
plans by the COES; (e) promoting scientific research and investment in energy; and (f) granting concessions or authorizations, as applicable, to entities to operate in power generation, transmission or
distribution in Peru.

OSINERGMIN —the Supervisor Body of Investment in Energy and Mining is an independent governmental regulatory agency responsible, among other things, for:

(a) supervising compliance of different entities with laws and regulations concerning power generation, transmission, distribution and trading; (b) setting transmission (electricity and natural
gas) and distribution (electricity and natural gas) tariffs; (c) setting and enforcing price levels in the electricity market in Peru and setting tariffs for customers subject to regulated tariffs; (d) imposing
fines and compensations for violations of the laws and regulations; (e) handling claims made by, against or between consumers and players in the electricity market; (f) supervising public tenders with
regard to PPAs between generation companies and distribution companies for the supply to regulated consumers; and (g) supervising operations of the COES.

Generation tariffs for the sale of energy by generation companies to distribution companies are generally determined based on tenders where OSINERGMIN sets a cap price that is not disclosed

to participants except when the respective bid is unsuccessful because no party has made an offer below such price cap. In addition, OSINERGMIN annually specifies energy prices, known as the
regulated tariff, which is used by market participants only in exceptional situations, as most of the PPAs with distribution companies are based on the results of the tenders. OSINERGMIN also
determines the annual capacity prices used in agreements between generation companies and distribution companies, as well as in the spot market.

127

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
COES —the Committee for the Economic Operation of the System is an independent private entity composed of qualified participants undertaking activities in the SEIN (i.e. , electric power

generators, transmission companies, distributors and major non regulated users) which is responsible, among others, for:

(a) planning and co-ordination of the power generation system for all power generation and transmission units, in order to ensure reliable generation at minimum cost; (b) setting spot market

prices based on marginal cost; (c) managing the clearing house of the spot market transactions between generation companies (excess and shortage of actual generation vs. demand pursuant to PPAs); (d)
allocating firm capacity and firm energy to generation units; (e) submitting proposals to OSINERGMIN for issuing regulatory standards, including technical standards and procedures used as guidelines
for carrying out COES directives; (f) determining on a monthly basis the amounts owed between generators as consideration for energy injected into the grid and for ancillary services; and (g) proposing
expansion plans for the transmission grid.

INDECOPI —the Antitrust and Intellectual Property Authority in Peru.

OEFA —OEFA is a specialized technical governmental agency, dependent on the Ministry of Environment, and responsible for enforcing, overseeing, controlling and declaring sanctions in

respect of environmental matters. It has the authority to directly oversee certain industries, such as mining, energy (electric power, oil and gas), fishing and manufacturing (beer, paper, cement, tannery
among others). On March 4, 2011, OEFA took on the responsibility of verifying the compliance with environmental regulations of companies operating in the hydrocarbon, mining, industrial, fishing
and energy industries.

SENACE —SENACE was created by Law No. 29968, enacted on December 20, 2012. SENACE is a specialized technical governmental agency, dependent on the Ministry of Environment, and

is in charge of reviewing and approving detailed environmental impact assessments related to projects involving activities, works or services that may have a significant impact on the environment. The
implementation of SENACE is expected to occur in the following four stages: (1) establishment of its governing bodies; (2) development and implementation of its internal management guidelines and
policies; (3) transfer of its jurisdiction from other governmental entities; and (4) monitoring of the jurisdiction transfer process. The first stage of this implementation began in April 2013 pursuant to a
schedule approved by Supreme Decree No. 003-2013-MINAM.

Generation Companies

Since 1992, the Peruvian market has been operating based upon a marginal generation cost system. Such system is embedded in the general electricity laws of Peru and is administrated by the

COES. In such capacity the COES has as its main mandate to satisfy all the demand of electricity at any given time (i.e., periods of 15 minutes each) with the most efficient generation assets available at
such time, independently of contractual arrangements between generators and their clients. For such purpose, the COES determines which generation facilities will be in operation at any given time with
the objective of minimizing the overall system energy cost. Energy units are dispatched (i.e., ordered by the COES to inject energy into the system) on a real-time basis; units with lower variable
generation costs are dispatched first and other less efficient generation units will be ordered to dispatch until the electricity demand is satisfied.

The variable cost for the most expensive generation unit dispatching in each 15-minute time period determines the spot price of electricity in said time period. Generally, the variable cost used

for dispatch is audited by the COES, based on actual fuel costs, the plant efficiency, and variable maintenance costs. However, as natural gas supply and transportation contracts contain high levels of
take-or-pay, the calculation of variable costs for these units is not straightforward. As a result, generators with power plants utilizing natural gas are allowed to declare the variable cost of their plants
once a year and such declared cost may differ from the actual cost of such plant and this declaration will be the variable cost applicable for dispatch purposes for the next 12 months, being the declared
cost part of the commercial strategy of the corresponding generator.

The spot market price is determined by the COES and is the price at which generation companies sell or buy power on the spot market during each 15-minute period. All injections and
withdrawals of electricity are valued at the spot market price of the 15-minute period when they are made. Any generation companies with excess generation over energy sold pursuant to PPAs in each
15-minute interval, sell their excess energy at spot prices to generation companies with lower generation than their contractual obligations under PPAs for that time period. COES defines, on a monthly
basis, the amounts that are owed by each generator with a net “buyer” position to generators with a net “seller” position. Generators with a net seller position directly invoice and collect from generators
with a net buyer position the amounts liquidated by the COES, respectively, not being the COES involved in the payment procedure or providing any form of payment guarantee. Distribution companies
and regulated consumers cannot purchase power off the grid at spot prices. Distribution companies must enter into agreements that guarantee offtakes of regulated consumers located in their concession
areas. Regulated consumers must enter into agreements with distribution companies or, in the case of a large consumer, may contract directly with power generation companies.

128

 
 
 
 
 
 
 
 
 
Power generation companies are also paid capacity fees by SEIN, based on their firm capacity and other variables. Capacity transactions are subject to Law 25844. This law stipulates a

methodology for calculating the capacity payments for each generation unit. Firm capacity calculation varies by type of technology, but is principally based upon the unit’s effective capacity and its
ability to supply energy continuously during the peak hours of the dry season, and also taking into consideration the historic availability statistics of the unit. Capacity payments are based primarily upon
the unit’s firm capacity and the regulated capacity price, but it is also affected by other variables, such as the expected supply-demand balance, the approved reserve margin, and the merit order of the
generation unit. PPAs are commercial agreements, independent of actual allocation of generation or actual provision of availability. Generation companies that generate over any 15-minute period
insufficient energy to satisfy the supply obligations under their PPAs purchase in the spot market the energy required to satisfy such supply obligations, based on COES procedures, from other generation
companies with excess generation or availability during any such period. The energy price for those transactions is the spot price, and the capacity price is regulated and set by OSINERGMIN. Due to
short term constraints in the gas supply and power transmission systems, which were generating distorting price signals in the spot market, the Peruvian government issued Emergency Decree 049-2008,
extended by Emergency Decree 079-2010 and Law 30115. Pursuant to this decree, the COES is required to simulate energy spot prices without accounting for limitations due to shortage in supply and
transportation of natural gas and for limitations on the transmission system. The latter scheme caps spot prices at a maximum amount of S/.313.5 per megawatt hour. Generation companies with units
that are called to dispatch that have a variable cost higher than the spot price determined pursuant to the referenced emergency decree are compensated for the difference in their cost by transmission
surcharges imposed on all end consumers of the SEIN ( i.e. , regulated and non-regulated customers) and collected by distribution companies. As of the date of this annual report, the aforementioned
government decree will be in force until December 2016. Emergency decrees are legislative statutes that are exceptionally issued by the executive branch of the Peruvian government which can only be
issued on circumstances and in areas specified in the Peruvian Constitution and are effective for a limited time period.

Sales of electricity under PPAs are not regulated unless they involve sales to distribution companies for resale to regulated customers. The latter PPAs are subject to price caps set by

OSINERGMIN prior to the corresponding public bidding process where generators submit their bids. Generation and distribution companies may also enter into contracts resulting from a direct
negotiation and not a bidding process, but only when the regulated tariff approved by OSINERGMIN is applicable. As with capacity transactions under PPAs, the financial settlement of energy
transactions under PPAs is independent of the actual dispatch of energy by any particular generation unit. Generators accrue receivables from the counterparties to their PPAs based on the contract price
in their PPAs and the amount of energy delivered from the SEIN, irrespective of the amount of energy that was produced by the generator counterparty to the PPA. The COES’s dispatch of generation
units in the SEIN is designed to satisfy the demand of electricity of the SEIN at any given time in the most efficient manner possible and the COES is not under any obligation to dispatch a particular
generation unit to fulfill a generator’s PPA commitments.

The general electricity laws of Peru require generators with an installed capacity in excess of 500 kW that use renewable energy sources (including hydro projects that do not exceed 20 MW) to
obtain a definitive generation concession, and generators with an installed capacity in excess of 500 kW that use thermal energy sources to obtain a generation authorization. A concession for electricity
generation activity is granted by the State of Peru acting through the MINEM and embedded in an agreement between the generator and the MINEM, while an authorization is merely a unilateral permit
granted by the MINEM. Authorizations and concessions are granted by the MINEM for an unlimited period of time and their termination, respectively, is subject to the same considerations and
requirements under the procedures set forth in the Law 25844 and related regulations. However, according to Legislative Decree 1221, the concessions granted as a result of an investment promotion
process will have a term of up to 30 years.

The definitive concession allows its titleholder to use public lands and infrastructure, and obtain easements imposed by the MINEM (in lieu of easements agreed with the owner of the affected

land plots) for the construction and operation of generation plants, substations or transmission lines and distribution networks, as applicable. The definitive concession is granted by a ministerial
resolution issued by the MINEM. Also, definitive concessions for generation with renewable energy sources, with an installed capacity equal to or less than 10 MW are granted by resolution of the
Energy and Mines Regional Directorate ( Dirección Regional de Energía y Minas ) of the corresponding regional government. In all cases a definitive concession involves the execution of a concession
agreement under the form of a public deed. The concession agreement is based on a standard form and is recorded in the public registries.

Under the general electricity laws in Peru, the titleholders of authorizations have most of the rights and benefits of concessionaires and have basically, the same obligations than concessionaires.

Definitive concessions and authorizations may be terminated by relinquishment or breach upon the occurrence of certain termination events set forth in Law 25844 and upon completion of a

procedure regulated by the general electricity laws in Peru. Termination events include: (i) failure to provide evidence of registration of the concession agreement in the public registry within the term of
twenty business days following such registration; (ii) non-compliance with the schedule for completion of the project included in the concession agreement, unless otherwise authorized by the MINEM
due to force majeure; (iii) failure to operate for at least 876 hours during a calendar year, without justified cause; and (iv) failure by the concessionaire, after being penalized, to operate the facilities in
accordance with COES’ operative regulations, unless otherwise authorized by the MINEM by justified reasons. The termination procedure for breach of the project schedule may be suspended by the
concessionaire upon delivery of a new project schedule that is guaranteed with a performance bond, thereby providing a mechanism that in practice substantially reduces the risk of termination for such
cause. According to Legislative Decree 1221, this guaranteed schedule will be approved only once.

129

 
 
 
 
 
 
Without prejudice to the above, Law 25844 provides that if the State of Peru declares the termination of a definitive concession for a reason different from those mentioned above ( i.e. ,
termination at will), the concessionaire shall be indemnified at the present value of the net cash flow of future funds generated by the concession’s activities, using the discount rate set forth in article 79
of such law (12% on an annual basis). As of the date of this annual report, IC Power believes no concession has been terminated by the Peruvian government invoking its authority to terminate at will.

Termination of a definitive concession is declared by a ministerial resolution issued by MINEM. In such case, MINEM shall ensure the continuity of the operation of the generation plant by

appointing a temporary administrator of the assets ( intervención ), until the concession is transferred to a new concessionaire. MINEM shall appoint a consultant to make a valuation of the concession
and its assets, elaborate the corresponding bidding rules and organize a tender procedure. MINEM shall award the definitive concession to the best bid offered. The product of the tender shall be used to
pay the costs of the temporary administration, the costs of the tender procedure, and any balance shall be allocated in favor of the former concessionaire. The procedure for termination of an
authorization is similar to that of a concession. IC Power believes that no definitive concession or authorization of a project that actually started construction or operation has been terminated, as of the
date of this annual report.

Transmission Companies

Transmission in the SEIN grid is operated by the individual companies that conform the transmission system and is centrally coordinated by the COES. Expansion plans for the transmission
grid are proposed by COES to MINEM for final approval; prior to executing the COES expansion plan, the Peruvian government prepares the transmission plan. Transmission companies who wish to
participate in construction of the transmission system specified in the expansion plan are required to submit their bid for a tender organized by the Peruvian Agency for the Promotion of Private
Investments ( ProInversión ). The transmission company awarded the tender may operate the line over the term of its concession (usually 30 years) and would be eligible to receive tariff payments paid
by all the final users in the SEIN, as specified in the tender document and incorporated into its concession contract. The development of any transmission activity requires a definitive concession if the
installation of the transmission lines will be within Peruvian state properties or if an easement from MINEM will be required.

The group of transmission lines created pursuant to such tenders after 2006 are known as “guaranteed transmission lines.” Transmission lines not included in plans such as the aforementioned,

independently constructed by transmission companies after 2006, are known as “complementary transmission lines”; tariffs for use of these lines are determined by OSINERGMIN and are paid based
upon actual use. Transmission lines created prior to 2006 are categorized into two groups. Transmission lines available for use by all generation companies are categorized as principal transmission lines;
transmission lines only used by specific generation or distribution companies and only available to these generation companies are categorized as secondary transmission lines. Both the Kallpa and Las
Flores facilities transmit the power generated by their plants through secondary transmission lines built prior to 2006, which then connect to primary and guaranteed transmission lines.

On July 2, 2016, OSINERGMIN issued Resolution 164-2016-OS/CD, or the Transmission Toll Resolution, which sets forth a new methodology, starting in May 2017 and ending in May 2021,

for the calculation of the transmission tolls payable by generation companies to transmission companies for a generator’s use of the secondary and complementary transmission lines within the grid.
Pursuant to the current methodology, a generation company must pay a transmission toll for each of the secondary or complementary transmission lines utilized by it; the new methodology set forth in
the Transmission Toll Resolution provides that each generation company must pay a transmission toll for each of the secondary and complementary transmission systems within the grid, regardless of
whether such generation company uses any particular secondary or complementary transmission system within the grid.

The Kallpa (including Las Flores) and CDA plants transmit the power generated by their plants through certain of the secondary transmission lines built prior to 2006, which then connect to

primary and guaranteed transmission lines. The implementation of the methodology set forth in the Transmission Toll Resolution will nonetheless obligate the Kallpa and CDA plants to provide
payments to the remaining secondary and complementary transmission lines in the system, notwithstanding Kallpa’s and CDA’s usage of other secondary transmission lines. Additionally, although
transmission tolls paid by Kallpa are typically passed through to Kallpa’s customers pursuant to its PPAs, it is unclear whether transmission tolls paid in respect of those secondary and complementary
transmission lines that are not utilized by Kallpa for the transmission of their energy (as required by the Transmission Toll Resolution) can be passed through to Kallpa’s customers under its PPAs.

The methodology introduced by the Transmission Toll Resolution is currently expected to be applied during the tariff setting process to take place in May 2017.

Distribution Companies

According to the general electricity laws in Peru, distribution companies are required to provide energy to regulated customers at regulated prices. Distribution companies may also provide
energy to customers not subject to regulated prices—pursuant to PPAs. As of the date of this annual report, the only private distribution companies holding a distribution concession are: Luz del Sur,
Enel Distribución Perú, Edecañete, Electro Dunas and Coelvisac. These five companies distributed 73% of all energy distributed by distribution companies in Peru in 2014. The remainder of power is
sold by state-owned entities.

130

 
 
 
 
 
 
 
 
 
 
Prior to July 2006, pricing in all contracts between generation companies and distribution companies with respect to sale of power to end customers at regulated prices, included energy tariffs
composed of payment for capacity, energy and transmission, as determined by OSINERGMIN. Distribution companies sell energy on the regulated market at cost plus an additional distribution charge
known as VAD. After July 2006, most of the agreements result from tenders in which generation companies bid prices. Bid prices include payment for capacity and energy.

The energy purchased by distribution companies from generation companies at regulated prices pursuant to old PPAs accounted for less than 56% of total purchasing in 2014—and is expected

to decrease in coming years.

Since July 2006, pursuant to Law 28832, contracts to sell energy to distribution companies for resale to regulated customers may be made at fixed prices based on public bids of generation

companies or at regulated prices set by the OSINERGMIN. After the bidding process is concluded, a distribution company will be entitled to purchase energy from the winning bidder at the bid price for
the life of the relevant PPA. The prices obtained through the public bid process are subject to a maximum energy price set by the OSINERGMIN prior to bidding. If all the bids are higher than the price
set by the OSINERGMIN, the public bids are disregarded and no PPA will be awarded. The process may be repeated until the prices that are offered are below the cap set by the OSINERGMIN for each
process.

Regulated tariffs are annually set by OSINERGMIN through a public procedure conducted by the Adjunct Manager´s Office for Tariff Regulation ( Gerencia Adjunta de Regulación Tarifaria )

and are effective from the month of May of each year. During this process, the OSINERGMIN will take into account a proposal delivered by the COES.

The price components of the regulated tariffs are: (i) the regulated price of energy; (ii) the capacity price in peak hours; and, (iii) the transmission toll, and are calculated considering the

following:

·

·

·

·

·

·

·

·

·

a projection of demand for the next 24 months, considering generation and transmission facilities scheduled to start operations during such period. The projection assumes, as a constant, the
cross-border ( i.e. , Ecuador) supply and demand based on historical data of transactions in the last year;

an operations program that minimizes the operation and rationing costs for the period taking into account the hydrology, reservoirs, fuel costs and a rate of return ( Tasa de Actualización )
of 12% annual. The evaluation period includes a projection of the next 24 months and the 12 months precedent to March 31 of each year considering historic data;

a forecast of the short-term marginal costs of the expected operations program, adapted to the hourly blocks ( bloques horarios ) established by OSINERGMIN;

determination of the basic price of energy ( precio básico de la energía ) for the hourly blocks of the evaluation period, as a weighted average of the marginal costs previously calculated
and the electricity demand, updated to March 31 of the corresponding year;

determination of the most efficient type of generation unit to supply additional power to the system during the hour of maximum peak demand during the year ( demanda máxima anual )
and the annual investment costs, considering a rate of return of 12% on an annual basis;

the base price of capacity in peak hours ( precio básico de la potencia de punta ) is determined following the procedure established in the general electric laws of Peru, considering as a cap
the annual investment costs (which include connection and operation and maintenance costs). An additional margin to the basic price shall be included if the reserve of the system is
insufficient;

calculation of the nodal factors of energy ( factores nodales de energía ) for each bar of the system. The factor shall be equal to 1.00 for the bar where the basic price is set;

the capacity price in peak hours (precio de la potencia de punta en barra) is calculated for each bar of the system, adding to the basic price of capacity in peak hours the unit values of the
Transmission Toll and the Connection Toll referred to in Article 60 of Law 25844; and

the bus bar price of energy ( precio de energía en barra ) is calculated for each bar of the system, multiplying the nodal basic price of energy ( precio básico de la energía nodal ) of each
hourly block by the respective nodal factor of energy.

131

 
 
 
 
 
 
 
 
 
 
 
 
 
 
The development of electricity distribution activities requires a definitive concession if such activities are dedicated to public service and the demand exceeds 500 kW.

Peruvian Energy Policy 2010-2040

The Energy Policy 2010-2040 was approved by Supreme Decree 064-2010-EM. By this document, the Peruvian government set forth the following objectives in order to improve the energy

market:

·

·

·

·

·

·

·

·

·

develop a diversified energy matrix, based on renewable energy resources and efficiency. The government, among other measures, will prioritize the development of efficient hydroelectric
projects for electricity generation;

competitive energy supply. One of the main guidelines is to promote private investment in energy projects. The Peruvian government has a subsidiary role in the economy as mandated by
the Peruvian Constitution;

universal access to energy supply. Among other guidelines, the Peruvian government shall develop plans to ensure the supply of power and hydrocarbons;

promote a more efficient supply chain and efficient energy use. Comprises promoting the automation of the energy market through technological repowering;

achieve energy self-sufficiency. For such purpose, the Peruvian government will promote the use of energy resources located in the country;

develop an energy sector with minimal environmental impact and low carbon in a sustainable development framework. Promote the use of renewable energy and eco-friendly technologies
that avoid environmental damage and promote obtaining Certified Emission Reductions by the energy projects developed;

strengthen the institutional framework of the energy sector. Maintain a legal stability intended to promote development of the sector in the long term. Likewise, simplification and
optimization of administrative and institutional structure of the sector will be promoted;

regional market integration for a long-term development. Regional interconnection agreements will permit the development of infrastructure for energy uses; and

developing the natural gas industry and its use in household activities, transportation, commerce and industry as well as efficient power generation.

Regulation of the Nicaraguan Electricity Sector

The electricity market in Nicaragua is subject to the Nicaraguan Electrical Industry Law and regulations based thereupon, which apply to the electricity sector and the wholesale power market.

The Electrical Industry Law is subject to supervision by local authorities.

The regulation of the Nicaraguan electricity market governs three sectors of the electricity market, which are vertically unbundled: generation, transmission and distribution. Units which use
renewable resources, such as wind, geothermal and biomass, are dispatched with priority over thermal units. Transmission is administered by a government-owned company and distribution is carried
out by a sole private company, which is subject to regulated prices.

The power pricing mechanism in Nicaragua is based on a free market where generation companies compete for dispatch, and the spot price is determined on an hourly basis, based on marginal

cost and considering the last unit dispatched in such hour. All power generation companies are required to obtain a license from the Nicaragua’s Ministry of Energy and Mines for the right to generate
and sell power to the national grid. Generation companies can sell energy to distribution companies or to non-regulated customers.

Regulation of the Salvadorian Electricity Sector

Through July 2011, the electricity market in El Salvador was based on purchase and sale of power by competitive price tenders by generation companies. In August 2011, the electricity market

in El Salvador was re-structured and is now essentially similar to electricity markets in other Latin American countries in which IC Power operates. Currently, generation units are dispatched based on
the variable cost thereof, and prices are determined by the variable cost of the most expensive unit operating. Due to this change, local distribution companies have started issuing public tenders for
purchase of power.

132

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Regulation of the Bolivian Electricity Sector

The electricity market in Bolivia is subject to Bolivia’s Electricity Act and regulations based there upon, which apply to the electricity sector and the wholesale power market in Bolivia and

which is subject to supervision by local authorities. The power pricing system in Bolivia is based on a free market where generation companies compete for dispatch of their generation units, and the spot
price is determined based on marginal cost (similar to Peru), with free access to transmission and distribution systems. However, major customers purchase power at regulated tariffs. The price for
energy and power generation in this country is based on marginal cost. According to Bolivia’s 2009 constitution, all power generation companies in Bolivia are required to obtain a license from the
relevant authority for the right to generate and sell power on the national grid. As of the date of this annual report, COBEE operates in accordance with the interim licenses awarded to it. There is no
certainty that IC Power will obtain the necessary permanent licenses.

In December 2011, the Bolivian government amended the applicable law to prohibit generation companies from entering into new PPAs. For further information on the risks related the

potential nationalization of IC Power’s assets in Bolivia, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—The Bolivian government has nationalized energy industry
assets, and IC Power’s remaining operations in Bolivia may also be nationalized .”

Regulation of the Dominican Republic Electricity Sector

The regulatory framework of the electricity sectors in the Dominican Republic is essentially similar to the one in Peru. Power generation in the Dominican Republic is based on free competition

among private and government-owned generation companies, whereas the transmission and distribution grid is controlled by government-owned companies. The main source of revenues for generation
companies is direct energy sale to distribution companies and from sale of energy and availability in the spot market.

The large-scale theft of power from the grid is prevalent in the Dominican Republic. Since generation and distribution companies do not pass through the cost associated with such theft to

consumers, the government must provide significant subsidies to cover for such losses.

Regulation of the Israeli Electricity Sector

IEC

IEC, in which the State of Israel maintains a 99.846% equity interest, operates as a vertically integrated electricity company. IEC generates and supplies the majority of electricity in Israel
according to licenses granted by virtue of the Electricity Sector Law, and transmits and distributes all of the electricity in Israel. In addition, IEC acts as the “System Operator” of Israel’s electricity
system, determining the dispatch order of generation units, granting interconnection surveys, and setting spot prices, etc. within Israel. IEC is required, among other things, to provide service to the
general public, purchase electricity from IPPs, provide infrastructure and certain backup services, and act to ensure provision of all of its services, including services pursuant to a development plan
approved in accordance with the Electricity Sector Law.

The objective of the Electricity Sector Law enacted in 1996, is “to regulate the activity in the electricity market for the good of the public, guaranteeing reliability, availability, quality,

efficiency, while concurrently creating conditions for competition and minimizing costs.”

IEC is classified as an “Essential Service Provider,” as defined in the Electricity Sector Law. As such, it is subject to statutory obligations and operations for proper management of the

electricity market in favor of the entire public without discrimination, including filing development plans, management of the power system, management of the power transmission and distribution
systems, providing backup and infrastructure services to IPPs and to consumers, and purchasing power from IPPs.

IEC was declared a monopoly by the Israeli Antitrust Authority in all segments of the electricity sector: generation, transmission, distribution, supply and provision of backup services for

electricity customers and manufactures.

Pursuant to the Electricity Sector Law, the Minister of National Infrastructures, Energy and Water Resources, or the Minister of Energy, has an overall responsibility for the electricity sector in
Israel, including responsibility for IEC and its overall supervision. In July 2013, the State of Israel appointed a steering committee, tasked with proposing a comprehensive reform of IEC and the Israeli
electricity market. The committee was mandated to review the electricity market structure, while focusing on unbundling the electricity market, the implementation of competition in the competitive
sectors, the financial stabilization of IEC, and the development of a plan to improve IEC’s efficiency. Although the steering committee has not published its final recommendations, and there had not
been any recent formal announcements concerning the steering committee’s discussions or negotiations with IEC and the State of Israel for some time, in November 2015 the steering committee
announced that it had resumed its discussions regarding comprehensive reform of IEC and the Israeli electricity market. The effect of any such reforms on either OPC-Rotem or OPC-Hadera is uncertain.

133

 
 
 
 
 
 
 
 
 
 
 
 
 
EA

The EA, which was established on until January 1, 2016, replaced the PUAE, which was established in 1996 in accordance with the Electricity Sector Law. The EA is responsible for granting

licenses (although licenses for facilities with a capacity of more than 100 MW are also subject to approval by the Minister of Energy), supervising the holders of such licenses, setting the tariffs and
determining the standards of service which are required from a holder of an Essential Service Provider license. As such, the EA oversees both the government-owned IEC and the IPPs.

The EA determines the electricity tariffs to the public, based on the costs of IEC which the EA decides to recognize, and including a fair rate of return on equity. The EA sets different tariffs for

the various electricity segments. In addition, the EA sets the tariffs that IEC pays for electricity purchased from IPPs. The Electricity Sector Law provides that IEC will collect payments pursuant to the
tariffs set by the EA and that IEC will make payments to another license holder or a customer, pursuant to the relevant tariffs.

Each year, the EA performs an annual update of the various components of the costs recognized in the tariffs, and publishes a new set of tariffs accordingly. In April 2012, the generation

component tariff increased 6% to NIS 366.6 per MWh. In July 2013, the PUAE published four generation component tariffs/power cost indicators, ranging from NIS 386 per MWh to NIS 333.2 per
MWh, instead of the single tariff that had previously been used. In January 2015, the PUAE reduced the tariff rates by approximately 10% to NIS 300.9 per MWh and NIS 301.5 per MWh effective as of
February 1, 2015. On September 8, 2015, the PUAE published a final decision, which became effective on September 13, 2015, reducing the PUAE generation component tariff by approximately 12%
from NIS 300.9 per MWh and NIS 301.5 per MWh to a single tariff of NIS 265.2 per MWh. In addition, in December 2016, the EA published its generation component tariff update, which became
effective on January 1, 2017, and further reduced the generation component tariff by approximately 0.5% from NIS 265.2 per MWh to NIS 264 per MWh. However, as part of the December 2016 EA
decision, the time of use tariffs were also adjusted to reflect a decrease in certain payments made by IPPs to the IEC. As a result of such adjustment, OPC-Rotem's tariffs effectively increased by
approximately 2% (despite the 0.5% reduction in the generation component tariff).

OPC-Rotem’s operations can be affected by changes in the PUAE’s policies, regulations, and tariffs. The EA’s generation component tariff, for example, serves as the base price for OPC-
Rotem’s calculation of the sale price of its energy to its private customers. As a result, increases or decreases in this tariff have a related effect on the sales price of OPC-Rotem’s energy and OPC-
Rotem’s revenues. In addition, the price at which OPC-Rotem purchases its natural gas from its sole natural gas supplier, the Tamar Group, is predominantly indexed (in excess of 70%) to changes in the
EA’s generation component tariff, pursuant to the price formula set forth in OPC-Rotem’s supply agreement with the Tamar Group. As a result, its increases or decreases have a related effect on OPC-
Rotem’s cost of sales and margins. In addition, the natural gas price formula in OPC-Rotem’s supply agreement is subject to a floor mechanism. As a result of previous declines in the PUAE generation
component tariff, OPC-Rotem began to pay the ultimate floor price in November 2015. Therefore, the September 2015 decline, the January 2017 decline and any further declines in the EA generation
component tariff will not result in a corresponding decline in OPC-Rotem’s natural gas expenses, and may therefore lead to a greater decline in OPC-Rotem’s margins, which may have a material
adverse effect on OPC-Rotem’s business, results of operations and financial condition. The next annual update of the generation component tariff is expected to be conducted in December 2017.

Furthermore, since 2013, the PUAE had been in the process of determining a system cost tariff. In August 2015, the PUAE published a decision that IPPs in Israel would be obligated to pay

system management service charges, which charges are retroactively effective as of June 1, 2013. According to the PUAE decision, as amended in September 2015, the amount of system management
service charges that would be payable by OPC-Rotem from the effective date of June 1, 2013 to June 30, 2015, was approximately NIS 159 million (approximately $41 million), excluding interest rate
and linkage costs, based upon the “average rate” of the system management service charges. However, as the rate of the new system management service charges, like other rates of the EA, varies by
season (e.g., summer and winter) and by demand period (peak, shoulder and off-peak), IEC’s final calculation of the amount payable by OPC-Rotem was based upon the applicable time of use rates,
which provides different energy rates for different seasons (e.g., summer and winter) and different periods of time during the day, or “Time of Use” rates. In December 2015, OPC-Rotem received an
invoice from IEC (in its capacity as the system manager) regarding the NIS 163 million (approximately $43 million) amount of system management service charges that would be payable by OPC-
Rotem for such period, including interest rate and linkage costs. In February 2016, OPC-Rotem paid NIS 154 million (approximately $41 million) to IEC in satisfaction of this amount (excluding the
interest rate, and linkage costs). On August 28, 2016, the EA published a decision to change the method of calculation of the interest rate with respect to system management service charges payable by
them from the effective date of June 1, 2013 to September 13, 2015 (amounting to approximately 2.5% of the total amounts payable by IPPs in respect of the system management charges), which
reduced the interest rate payable by IPPs such as OPC-Rotem.

For further information on Israel’s seasonality and the related EA tariffs, see “ —Industry Overview—Overview of Electricity Generation Industry—Israel .” For further information on the effect

of EA tariffs on IC Power’s revenues and margins, see “ Item 5. Operating and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—EA Tariffs Affect IC
Power’s Results in its Generation Business’ Israel Segment.” IC Power is considering the implications of this decision and may contest it.

134

 
 
 
 
 
 
 
Additionally, on November 19, 2015, as a part of the legislative process regarding the State of Israel’s 2015—2016 budget, new legislation was approved by the Knesset (the Israeli parliament)
incorporating, among other things, amendments to the Electricity Sector Law-1996. According to an amendment to the Electricity Sector Law, which was published on November 30, 2015, and became
effective on January 1, 2016, the PUAE was replaced by the EA, which was merged with the electricity unit of the Israeli Ministry of National Infrastructures, Energy and Water Resource and is
therefore subordinate to the Minister of National Infrastructures, Energy and Water Resources. As a result, the Minister of National Infrastructures, Energy and Water Resources may overrule the EA’s
decisions, demand a rehearing of specific decisions (excluding tariff decisions, which remain entirely in the EA’s independent authority), and controls the EA’s key board appointments and policies.

Any decisions of the PUAE, including decisions regarding licenses and tariffs, prior to this date will remain in force and are deemed to have been made by the EA.

Regulatory Framework for Conventional IPPs

The regulatory framework for current and under construction conventional IPPs was set by the PUAE in 2008. An IPP may choose to allocate its generation capacity, as “permanently available
capacity,” or PAC, or as “variable available capacity,” or VAC. PAC means capacity that is allocated to IEC and is dispatched according to IEC’s instructions. PAC receives a capacity payment for the
capacity allocated to IEC, as well as energy payment to cover the energy costs, in the event that the unit is dispatched. VAC refers to capacity that is allocated to private consumers, and sold according to
an agreement between the IPP and a third party. Under VAC terms, an IPP may sell the capacity to IEC on a short-term basis. IEC may purchase electricity from the VAC allocated to it, based on a bid
price. An IPP may choose to allocate its capacity between 70% to 90% as PAC, with the remaining 30% to 10% as VAC, or 100% VAC.

In December 2014, the PUAE published a new regulatory framework for conventional IPPs, which shall apply to conventional IPPs who have commenced commercial operations as of January

2019. The new framework allows an IPP to choose between a transaction with IEC (similar to PAC regulation), and a bilateral agreement with a third party.

OPC-Rotem’s Regulatory Framework

OPC-Rotem operates according to a tender issued by the state of Israel in 2001 and, in accordance therewith, OPC-Rotem and the IEC executed IEC PPA in 2009, which stipulates the

regulatory framework of OPC-Rotem. OPC-Rotem’s framework differs from the general regulatory framework for IPPs, as set by the PUAE and described above.

According to the IEC PPA, OPC-Rotem may sell electricity in one or more of the following ways:

1. Capacity and Energy to IEC : according to the IEC PPA, OPC-Rotem is obligated to allocate its full capacity to IEC. In return, IEC shall pay OPC-Rotem a monthly payment for each

available MW, net, that was available to IEC.

In addition, when IEC requests to dispatch OPC-Rotem, IEC shall pay OPC-Rotem for the starting of the power plant (an amount that covers the starting costs), as well as a variable
payment for each operating hour. IEC shall also pay the fuel cost of OPC-Rotem.

2.

Sale of energy to end users : OPC-Rotem is allowed to inform IEC, subject to an advanced notice, that it is releasing itself in whole or in part from the allocation of capacity to IEC, and
extract (in whole or in part) the capacity allocated to IEC, in order to sell electricity to private customers pursuant to the Electricity Sector Law. OPC-Rotem may, subject to an advanced
notice, re-include the excluded capacity (in whole or in part) as capacity sold to IEC.

OPC-Rotem informed IEC, as required by the IEC PPA, of the exclusion of the entire capacity of its power plant, in order to sell such capacity to private customers. Since July 2013, the entire

capacity of OPC-Rotem has been allocated to private customers. Under the IEC PPA, OPC-Rotem can also elect to revert back to supplying to IEC instead of to private customers.

The IEC PPA includes a transmission and backup appendix, which requires IEC to provide transmission and backup services to OPC-Rotem and its customers, for private transactions between
OPC-Rotem and its customers, and the tariffs payable by OPC-Rotem to IEC for these services. Moreover, upon entering a PPA between OPC-Rotem and an individual consumer, OPC-Rotem becomes
the sole electricity provider for this customer, and IEC is required to supply power to this customer when OPC-Rotem is unable to do so, in exchange for a payment by OPC-Rotem according to the
tariffs set by the EA for this purpose. For further information on the risks associated with the indexation of the EA’s generation tariff and its potential impact on OPC-Rotem’s business, financial
condition and results of operations, see “ Item 3.D Risk Factors—Risks Related to IC Power’s Generation Business—The profitability of IPPs in Israel may be adversely affected by changes in Israel’s
regulatory costs and EA tariffs. ”

135

 
 
 
 
 
 
 
 
 
 
 
 
 
Regulatory Framework for Cogeneration IPPs

The regulatory framework for current and under construction cogeneration IPPs was established by the PUAE in its 2008 and 2013 decisions. The primary difference between the regulation of
cogeneration IPPs (as compared to the regulation of conventional IPPs) is that, as long as the cogeneration production unit meets the definition of a “Cogeneration Production Unit” as stipulated in the
regulations (which require such unit to, among other things, meet a certain efficiency rate), and if the cogeneration IPP so wishes, IEC will be obliged to purchase energy from such IPP in accordance
with the following provisions:

1. At peak and shoulder times, one of the following shall apply:

a. each year, the IPP may sell up to 70% of the total electrical energy, calculated annually, produced in its facility to IEC—for up to 12 years from the date of the grant of the license; and

b. each year, the IPP may sell up to 50% of the total electrical energy, calculated annually, produced in its facility to IEC—for up to 18 years from the date of the grant of the license.

2. At low demand times, IPPs with units with an installed capacity of up to 175 MW, may sell electrical energy produced by it with a capacity of up to 35 MW, calculated annually (in

accordance with the duration applicable to the IPP with respect to peak and shoulder time, as set forth above).

According to regulations published by the PUAE in January 2015, if a cogeneration facility no longer qualifies as a “Cogeneration Production Unit,” such cogeneration facility may be entitled,

under certain circumstances, to operate under the regulatory framework for conventional IPPs, with certain modifications and limitations.

OPC-Hadera’s Regulatory Framework

OPC-Hadera holds a conditional license, granted on October 19, 2012, for the construction of a cogeneration power station in Israel. In order to preserve the validity of its license, OPC-Hadera

must meet certain project milestones, including the receipt of a certain amount of financing for the project within 30 months from the date the conditional license was granted. The milestone of “financial
closing” was extended by the EA on May 5, 2016, which extended the milestone to 47 months from the date the conditional license was granted (i.e., September 19, 2016). On September 18, 2016, OPC-
Hadera provided the EA a notice that it had reached “financial closing” with respect to financing for the project. However, the EA has not officially provided its approval with respect to such “financial
closing.”

According to the Electricity Sector Regulations (Cogeneration)-2004, the EA has the authority (subject to the Minister of Energy’s approval) to extend milestones set in conditional licenses with

additional periods of up to 12 months in each instance, if the reasons for the delay are not attributable to the license holder and not within its control. On January 8, 2017, a new draft amendment to the
Electricity Sector Regulations (Cogeneration)-2004 was published for a public hearing to be concluded shortly thereafter. If approved, the EA will have additional authority to extend the milestone of
“financial closing” by an additional 6 months in circumstances where such milestone was already extended, and as long as the additional extension is consistent with the Minister of Energy’s policies and
does not materially harm a different license holder. An extension for licenses for projects relating to plants exceeding 100 MW (such as OPC-Hadera) also requires the Minister of Energy’s approval.
Based on materials attached to the proposed amendment, which indicate that the amendment is intended, inter alia, to give an immediate solution to power stations facing similar circumstances as OPC-
Hadera, IC Power believes that if the new amendment is approved, the “financial closing” of OPC-Hadera will also be approved by the EA.

Moreover, as set forth above, OPC-Hadera must meet certain conditions before it will be subject to the regulatory framework for cogeneration IPPs and be considered a “Cogeneration

Production Unit.” For example, OPC-Hadera will have to obtain a certain efficiency rate which will depend, in large part, upon the steam consumption of OPC-Hadera’s consumers. In circumstances
where OPC-Hadera no longer satisfies such conditions and therefore no longer qualifies as a “Cogeneration Production Unit,” OPC-Hadera may be entitled to operate under the special regulatory
framework set forth in the regulations published by the EA in January 2015, as described above in “— Regulatory Framework for Cogeneration IPPs .”

Regulation of the Guatemalan Electricity Distribution Market

The General Electricity Law and the Liberalization of the Electricity Sector

The General Electricity Law provided for the liberalization of the electricity industry and authorized the creation of two new institutions to regulate the electricity sector: the CNEE and the

AMM. Regulations implementing the General Electricity Law were adopted by the Executive through the MEM in 1997 and 1998, and amended in 2007 and 2008.

The CNEE and the AMM were created in 1997 and 1998, respectively, completing the legal framework for the privatized electricity sector.

136

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The electricity industry in Guatemala is governed by the General Electricity Law and related regulations. The General Electricity Law was adopted in 1996 to liberalize the electricity sector.

Limitations on Activities of Industry Participants

The General Electricity Law provides that no individual company may engage directly in more than one of the following businesses: generation, transmission, or distribution services. However,
the General Electricity Law allows any company engaging any such specific business to own stock or other interests in companies engaging any other specific business within the industry. It also allows
generators to own transmission lines in certain cases.

Deregulation of Generation

The General Electricity Law provides that a governmental license is only required to operate transmission and distribution assets, and, in the case of a power plant, only when electricity is being

generated through government-owned resources (i.e. hydro and geothermal). Otherwise, generation activities are not regulated.

Unrestricted Access to Transmission and Distribution Systems

The General Electricity Law provides that transmission and distribution companies must grant all customers the ability to connect to their transmission and distribution grids in exchange for toll

payments. Unregulated customers are entitled to choose freely their supplier and to acquire electricity from any source and transmission and distribution companies must allow such electricity to flow
through their transmission lines. Distribution and transmission companies are entitled to collect distribution or transmission tolls for the use of their grids. Failure to provide such access by a transmission
or distribution company may lead to fines and ultimately the termination of that company’s distribution authorization, and potentially the appointment of a receiver of the distributor and the sale of its
assets.

Unregulated Customers

The General Electricity Law provides that no public price regulation may be established relating to PPAs entered into by end users that have power demand greater than 100 kW. The MEM has
the authority to lower or remove the threshold power demand that defines customers as “unregulated customers.” Unregulated customers are entitled to choose as their supplier the distribution company
operating the distribution grid to which the unregulated customer is connected, any generator that supplies electricity to the Guatemalan National Electricity System or any electricity broker.

Regulated Customers and Distribution Authorizations

The General Electricity Law provides that those companies in the distribution business that have granted authorization from the MEM may use public property (including rivers) and acquire

mandatory easements on privately owned lands as necessary to carry on their business activities. The General Electricity Law provides that the MEM may authorize a company to use the public domain
and impose easements on private lands to distribute or transmit electricity. Authorizations for distribution services are granted on a non-exclusive basis for specific geographic areas and have terms of up
to 50 years.

The General Electricity Law provides that a distribution company must provide service to all those demanding the supply of electric energy that are located within 200 meters of its distribution

lines. In addition, a distributor must provide electricity to all parties who demand their services within the service area covered by the distributor’s authorization, provided the interested party provides
for its connection to the distributor’s system. A distributor must also provide electricity to all parties who demand the distributor’s service and furnish their own lines or those of a third party. A
distributor must provide these services at prices and quality levels determined by the CNEE.

All tariffs charged by distribution companies to regulated customers are determined and revised by the CNEE pursuant to legal and regulatory proceedings.

Principal Regulatory Authorities

Ministry of Energy and Mines (MEM )

The MEM is the Guatemalan government’s highest-ranking regulator of the electricity industry. The MEM is responsible for enforcing the General Electricity Law and the related regulations

and for the coordination of policies between the CNEE and the AMM. The MEM also has the authority to grant operating authorizations to distribution, transmission and generation companies.

137

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
National Electric Energy Commission (CNEE)

The Guatemalan electricity industry is regulated by the CNEE, a regulatory agency created pursuant to the General Electricity Law. The CNEE acts as the technical arm of the MEM. The

CNEE is comprised of three members who are appointed by the Guatemalan government. The members are nominated by the MEM, the national universities, and the board of the AMM. The
Guatemalan President then chooses one member from each of the lists of candidates submitted by these entities to form a three-director board of the CNEE. Members hold office for five years. The
General Electricity Law establishes the following powers and duties for the CNEE:

· Determine transmission and distribution tariffs;

·

·

·

·

·

Enforce the sector’s laws and regulations and impose fines and penalties as legally prescribed;

Supervise compliance by the holders of any kind of authorization to carry on business in the electricity sector, protect the rights of end-users, and prevent anti-competitive, abusive and
discriminatory activities;

Conduct arbitration proceedings and exercise powers of review in case of controversy among any parties subject to the General Electricity Law and its regulations;

Issue technical rules and performance standards for the electricity sector and enforce accepted international practices; and

Issue regulations and rules to secure access to and use of the transmission lines and distribution grids.

Wholesale Market Administrator (AMM)

The Guatemalan wholesale market is managed by the AMM, an independent private entity created pursuant to the General Electricity Law. The AMM coordinates the operation of the
generators, international interconnections, and transmission lines that form the Guatemalan National Electricity System. The AMM is in charge of overseeing the safety and operation of the Guatemalan
National Electricity System and the efficient dispatch of electricity, with the mission to minimize operating costs, including costs from losses, and compliance with service quality requirements. The
AMM is also responsible for scheduling the operation of the system and managing the dispatch of electricity on the basis of lowest available marginal cost.

All policies and rules of the AMM are subject to approval by the CNEE. If a generation company, transmission company, distribution company, electricity broker or large user does not operate

its facilities in accordance with the regulations established by the AMM, the CNEE has the ability to impose fines and, in the case of serious breaches, may require that a company disconnect from the
Guatemalan National Electricity System.

The Wholesale Electricity and Capacity Markets

The Guatemalan wholesale electricity and capacity markets are “open border” markets that allow market participants to purchase energy and capacity from generators and to sell energy and
capacity to customers inside and outside Guatemala. Participation in the wholesale electricity market is not mandatory, but all agents must abide by AMM rulings and instructions, even if they are not
wholesale market participants. The parties that may, but are not required to, participate in the wholesale electricity and capacity market should satisfy the following parameters:

·

·

·

·

·

generators with an installed capacity of more than 5 MW;

distribution companies with 15,000 or more customers;

transmission companies with a system connected to plants with capacity of more than 10 MW;

electricity brokers buying or selling 5 MW or more, including importers and exporters; and

unregulated customers.

Purchases and sales of capacity are conducted through the fixed-term wholesale capacity market. Generators may sell generating capacity at negotiated prices through medium- or long-term

PPAs with distribution companies, unregulated customers or electricity brokers. Distribution companies are required to have PPAs covering at least 100% of their projected capacity needs for the current
year and the following year. Distribution companies may only enter into PPAs through public bids conducted under the supervision of the CNEE.

138

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Generators may sell uncommitted electricity in the spot market at prices determined as described below. Other participants in the wholesale electricity market may buy electricity in the spot

market to cover shortages under their PPAs or to sell excess electricity. The AMM dispatches electricity in the spot market based on the marginal variable cost of the generators offering electricity,
giving priority to electricity produced at the lowest marginal cost.

The prevailing price in the spot market for electricity is established on an hourly basis based on the cost of the last dispatched plant needed to cover demand.

Participants in the wholesale market can also trade capacity, permitting generators that are unable to supply their committed capacity to purchase additional capacity and other market

participants who have contracted to purchase capacity in excess of their need to sell their excess capacity. Prices in the capacity market are set by the AMM based on the theoretical cost of installing
efficient power generation.

Operation of the Guatemalan National Electricity System

The AMM runs the Guatemalan National Electricity System in real time, arranging any re-dispatches deemed necessary to correct differences between actual and projected power demand to

ensure that the Guatemalan National Electricity System runs safely and efficiently. In the event of electricity failures and emergencies, the AMM is responsible for ensuring that service be reestablished
and normal operation of the Guatemalan National Electricity System is achieved.

All participants in the wholesale electricity market are required to abide by the operating and dispatch instructions issued by the AMM. The commercial practices and rules of the AMM create

the framework within which the participants are obligated to carry on their business in the wholesale electricity market.

All parties connected to the Guatemalan National Electricity System, including large generation facilities, distribution companies, transmission companies, electricity brokers and unregulated

customers that choose not to participate in the wholesale market, as well as small generators, transmission companies and distribution companies that cannot participate in the wholesale market, are
required to submit to the directions of the AMM in all that concerns technical standards for the adequate operation of the Guatemalan National Electricity System.

Quality of Service Regulation

The CNEE establishes minimum levels of quality for electricity services. In addition, the CNEE imposes certain obligations on distribution companies related to quality standards, and fines
them for failure to comply with such quality standards and other obligations. The CNEE regulates the quality parameters of the supplied electricity (tension, frequency and disturbances), establishes
parameters for continuity (number and length of interruptions) and minimum standards for customer service. An interruption is defined as any period of time over three minutes during which electricity
is not available.

The CNEE monitors the number of interruptions, the length of time of each interruption and the total number of customers affected. If a distribution company experiences excessive

interruptions, it must indemnify the affected customers.

Each distribution company is required to survey its customers annually to obtain information regarding its compliance with required customer service regulations. The CNEE publishes the

results of these surveys. Fines and other sanctions can also be imposed if a distribution company does not comply with CNEE customer service standards or if there are other service complaints.

If a distribution company does not comply with the CNEE’s regulations regarding the quality of the supplied electricity and implementation of electricity services and quality of service, it can

be fined and, ultimately, its authorization can be revoked. In addition, the General Electricity Law provides for an appointment of a receiver and the sale of the distribution company’s assets.

Tariffs and Tolls

Distribution Tariffs

Pursuant to the General Electricity Law, distributors charge consumers a price for electricity sales based on distribution tariffs, consisting of an electricity charge and a VAD charge, which are
determined on the basis of the legal and regulatory proceedings by the CNEE every five years. As a general rule, customers (whether regulated or not) who are connected at the same voltage level must
pay the same distribution tariff, and therefore there is only one distribution tariff per voltage. The VAD component of the distribution tariff covers the operating expenses, capital expenditures, and the
cost of capital of a model efficient distribution company and is revised every five years with semi-annual adjustments for inflation and local currency exchange rates against the U.S. Dollar. The tariffs
are set by the CNEE in accordance with the applicable legal and regulatory proceedings.

139

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The process of establishing the distribution tariffs involves several parties, including distribution companies, and takes place over several stages. While the tariffs are intended to be set on the

basis of objective criteria, the CNEE can exercise discretion. The prices for electricity charged to unregulated customers are not regulated by the CNEE; however, unregulated customers must pay a
regulated tariff, equal to the applicable VAD charge, for delivery of electricity through the facilities of a distribution company, as a toll. Therefore, while the customers who are connected at the same
voltage level pay the same distribution tariff, the price difference between regulated, unregulated and social tariffs arises from generation costs which vary among different categories.

Regulated Tariffs

The CNEE adjusts the purchase and transmission costs of distributors and publishes a schedule of tariff rates for regulated customers every three months. These tariffs currently include:

·

·

·

·

·

a social tariff available to customers that demand up to 300 kWh per month;

a regular tariff, available to all customers that purchase electricity at low voltage;

three additional tariffs available to customers that purchase electricity for delivery at low voltages (of which two are applicable to Energuate’s customers);

three tariffs available to customers that purchase electricity for delivery at medium voltage (of which two are applicable to Energuate’s customers); and

a tariff available to municipalities that purchase electricity for public lighting.

The social tariff, the regular tariff and the public lighting tariff consist solely of an electricity charge, a VAD charge and a monthly fixed charge for connection to the distribution system.

The three additional low voltage tariffs and three medium voltage tariffs are available for:

·

·

·

customers that purchase capacity and electricity only during hours of peak demand which are between 6:00 p.m. and 10:00 p.m.;

customers that purchase capacity and electricity only during off-peak hours (between 10:00 p.m. and 6:00 a.m.); and

customers that purchase capacity and electricity during any time of the day.

Customers that request these tariffs enter into a contract with the distribution company to purchase a specified amount of capacity. These tariffs consist of a fixed capacity consumption charge
for each contracted kW, an electricity charge for the electricity used by the customer, a capacity consumption charge and a monthly fixed charge for connection to the distribution system. The capacity
consumption charge consists of two components: a generation and transmission component and a distribution component. Customers are charged the capacity consumption charge based on the maximum
amount of capacity demanded during any billing cycle.

The electricity charge and the generation and transmission components of the capacity consumption charge is adjusted in the same manner as the electricity charge under the social tariff, the
regular tariff and the public lighting tariff. The capacity charge and the distribution component of the maximum capacity charge are adjusted in the same manner as the VAD charges under the social
tariff, the regular tariff and the public lighting tariff.

Tariff Adjustments

The VAD charges for each distribution company are established by the CNEE every five years and are calculated to equal an annuity over 30 years of the New Replacement Value of the

distribution system of a model efficient distribution company. The New Replacement Value of a distribution system is determined by calculating the replacement value of a distribution network
economically adjusted such that it would allow the distribution company to offer the services as if provided by a distribution company operating in the same area. The replacement value of the
distribution system is determined based on a discount rate set by the CNEE, based on studies conducted by independent consultants. The calculation of the VAD for a distribution company uses as a
benchmark the costs estimated of a model efficient distribution company serving a similar distribution area and accounts for the following costs:

·

·

an allowance for electricity losses as determined by the CNEE;

administrative costs; and

140

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

costs of maintaining and operating the distribution systems, including the cost of capital.

The VAD charged by DEORSA and DEOCSA until January 2019 was established in January 2014. New VAD charges applicable to DEORSA and DEOCSA are scheduled to be established in

January 2019. The process of establishing the VAD charges requires the distribution company to engage an independent consultant approved by the CNEE to calculate the components of the VAD
(including the New Replacement Value) applicable to the distribution company’s system. If the distributor fails to deliver the requested corrections, the CNEE can hire a consultant to calculate the VAD
applicable to the distribution company’s system. Following the submission of the VAD calculated by the independent consultants to the CNEE, the CNEE decides whether to approve the VAD
calculated by the consultants. In the event that the CNEE does not approve the new VAD charges, the dispute is submitted to an expert panel composed of three individuals, one named by the distribution
company, one named by the CNEE and one named by mutual agreement.

The expert panel must rule within 60 days. In one instance, the General Electricity Law and its regulations were construed such that the CNEE was not bound to adopt the decision of the expert

panel and is free to set the VAD at its discretion.

The VAD charges are adjusted semi-annually to reflect the effect of fluctuations in the Guatemalan Quetzal/Dollar exchange rate on the Dollar-denominated components of the New

Replacement Value calculation and the effects of Guatemalan inflation on the Quetzal-denominated components of the New Replacement Value calculation.

The energy charge is designed to allow a distribution company to recover the costs of the electricity that it purchases on behalf of its customers and the costs of transmission of such electricity
to the connection points of its own grid. The energy charge component of the regulated tariffs consists of a base tariff and an electricity adjustment surcharge. Under the General Electricity Law and the
regulations of the CNEE, the base tariff is adjusted annually to reflect anticipated changes in the cost of the electricity to be purchased by the distribution company during the following year. The
electricity adjustment surcharge is adjusted quarterly to reflect variations in the actual cost of electricity purchased by the distribution company from the projected cost. These mechanisms attempt to
achieve neutrality of the costs incurred by the distributor on the client’s behalf.

The Social Tariff

In 2001, Guatemala enacted the Social Tariff Law ( Ley de la Tarifa Social para el Suministro de Energía Eléctrica ) which requires that a special tariff, called the “social tariff”, be made

available to customers with electricity consumption of up to 300 kWh per month. Under regulations adopted by the CNEE, distribution companies solicit bids for PPAs to supply the electricity to be
delivered to customers eligible for the social tariff. The VAD charge is the same for all types of tariffs. Under the social tariff, energy and capacity are provided at market prices, and the INDE subsidizes
the consumption of energy by some or all customers eligible for the social tariff.

Energuate’s customers who have energy consumption below 100 kWh receive a subsidy from the Guatemalan government towards the payment of the energy charge of the applicable tariff.

Such subsidy is calculated and paid directly by the INDE to the distributors, such as Energuate, on a monthly basis. In December 2016, INDE officially notified Energuate that it will reduce on a monthly
basis over a three year period the subsidy applicable to all customers eligible for such subsidy, eliminating the subsidies for customers with energy consumption between 89 kWh and 100 kWh by
November 2017 and for customers with energy consumption between 61 kWh and 88 kWh by March 2019. In March 2017, INDE announced that the subsidies would not be eliminated as contemplated
by the INDE’s December 2016 announcement.

Transmission Tolls

The General Electricity Law provides that all parties that connect to the Guatemalan National Electricity System, including all generation companies, transportation companies, distribution

companies, electricity brokers and unregulated customers, must pay for their connection to and use of the Guatemalan National Electricity System. The secondary transmission tolls for electricity can be
negotiated by the generation companies, distribution companies or unregulated customers using the Guatemalan National Electricity System. In the absence of a negotiated price, tolls for the use of the
secondary transmission lines, substations and distribution installations are set according to regulations issued by the CNEE.

There are separate tolls applicable to the primary transmission system and the secondary transmission system. Both tolls are determined on the basis of the variable transmission revenue of

replicating a “model” transmission system, including an estimated return on capital, or VNR, of the transmission system. The VNR of a transmission system is the estimated cost of replicating a “model”
transmission system including an estimated return on capital.

The tolls for the primary transmission system are determined by the CNEE based on information provided by the owners of the transmission facilities and the AMM. CNEE revises transmission

tolls for the primary transmission system every two years and whenever new generation capacity is connected to the Guatemalan National Electricity System or a portion of the secondary transmission
system is upgraded to become part of the primary transmission system. The primary transmission toll is collected by the AMM.

141

 
 
 
 
 
 
 
 
 
 
 
 
Transmission tolls for the secondary transmission system are negotiated between the owners of these transmission facilities and the generators and electricity brokers that use these transmission

facilities. If these parties cannot reach an agreement with respect to transmission tolls, the transmission tolls are established by the CNEE according to applicable regulations. The transmission tolls for
distribution facilities should be equal to the VAD charge. However, there have been instances where the transmission tolls were lower than the VAD charge.

Transmission tolls for use of the primary transmission system are paid by generation companies or importers and are included as part of the cost in the tariffs paid by regulated customers.

Transmission tolls for use of the secondary transmission system are paid by distribution companies, electricity brokers or unregulated customers. Transmission tolls for use of the secondary transmission
system paid by distribution companies are included as part of the cost in the tariffs paid by regulated customers, if authorized by the CNEE.

Qoros

Qoros is a China-based automotive company delivering international standards of quality and safety, as well as innovative features, to the large and fast-growing Chinese automotive market.

Qoros’ vision is to design, manufacture, distribute, and service (through dealers) high quality cars for young, modern, urban consumers. Qoros has assembled a highly experienced international and
domestic management team with decades of experience in leading global OEMs and other industry participants, and has established strong relationships with world class suppliers and engineering
service providers. Qoros’ existing manufacturing facility has a technical capacity of 150 thousand units per annum, which can be increased to approximately 220 thousand units per annum through the
utilization of different shift models (and further increased through additional shift optimizations and improvements in workday efficiency) and is located in Changshu, China. In 2016, Qoros launched
the Qoros 5 SUV and the Qoros 3 GT, a crossover sedan. Qoros sold approximately 24,000 vehicles in 2016, as compared to approximately 14,000 vehicles in 2015.

Qoros is seeking to establish a position in the Chinese passenger vehicle market, one of the largest and fastest growing passenger vehicle market in terms of new units sold, according to China

Association of Automobile Manufacturers , or CAAM. In designing its vehicles, Qoros devoted significant time and resources to ascertain the vehicle features preferred by its targeted consumers: young,
modern, urban consumers who have demonstrated a preference for C-segment vehicle models. Qoros is currently focused on the C-segment, which primarily includes the sedan, hatchback, SUV, and
multi-purpose-vehicle body types and is the largest vehicle segment in China with 13.3 million C-segment vehicles, or 61% of China’s total passenger vehicle sales, sold in 2016 (including exports, and
excluding imports) according to China Passenger Car Association , or CPCA. Qoros’ strategy is to offer Chinese consumers expressive design, international standards of quality and safety, as well as
innovative features, in a Chinese manufactured and branded vehicle, and Qoros believes that it will be positioned to enter into other markets in the future.

Qoros’ vehicles reflect its target customer’s preference for vehicle safety, innovative connectivity, and vehicle performance and design features tailored to the Chinese market. Qoros received

numerous awards throughout 2016, including the highest quality ranking among all car brands in Autohome’s 2016 annual top quality rankings and a Gold Metal Rating by the China Automotive
Technology & Research Center for the Qoros 3 Sedan. Qoros has continued to receive awards in 2017, including the 2017 Green Good Design award for Qoros' NEV concept models.

Qoros received numerous awards throughout 2016, including the highest and second highest quality ranking among all domestic brands and all car brands (including JV brands), respectively, in

Autohome’s 2015 annual top quality rankings. In addition, Qoros received the highest quality ranking among all car brands in Autohome’s 2016 annual top quality rankings and a Gold Metal Rating by
the China Automotive Technology & Research Center for the Qoros 3 Sedan.

Each Qoros vehicle is equipped with a Multi-Media Hub, or MMH, which includes an 8-inch touch screen and interactive human machine interface, or HMI, system. Through the MMH, most

of Qoros’ vehicles are equipped with the “QorosQloud,” an innovative, cloud-based entertainment and services system that delivers a variety of free (e.g., cloud-enhanced navigation, car care, and social
sharing) and premium (e.g., real-time traffic and parking information) connectivity features.

We have a 50% stake in Qoros, with the remaining 50% interest owned by Wuhu Chery, a subsidiary of Chery, a large state controlled holding enterprise and Chinese automobile manufacturing

company that has been producing automobiles since 1999. As of December 31, 2016, Kenon’s wholly-owned subsidiary Quantum and Wuhu Chery each have invested RMB5.9 billion to Qoros via
capital contributions and/or convertible or non-convertible shareholder loans. In 2016, Qoros' shareholders each made shareholder loans of RMB975 million to Qoros (including loans of RMB450
million from Ansonia to Quantum used to make back-to-back loans in the same amount to Qoros). In March 2017, Kenon funded shareholder loans of RMB388.5 million to Qoros, of which 50% of this
amount was funded on behalf of Kenon and 50% was funded on behalf of Chery (in connection with a RMB425 million reduction in Kenon’s back-to-back guarantee obligations to Chery).

142

 
 
 
 
 
 
 
 
 
In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional
vehicle manufacturing base. Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association,
among other agreements. Such further investment, if provided, is expected to dilute Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to
Qoros. For further information, see “ —Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

Qoros will need to secure additional financing to meet its operating expenses (including accounts payable) and debt service requirements. Qoros’ ability to obtain such financing will depend on

a number of factors, including its sales performance, and Qoros may be unable to secure such financing. If Qoros is not able to raise additional financing as required, it may be unable to continue
operations, in which case Kenon may lose its entire investment in Qoros and Kenon may be required to make payments under its back-to-back guarantees to Chery in respect of Qoros’ bank debt and
pledges over Qoros shares by Quantum may be enforced. See “ Item 3.D Risk Factors — Risks Related to Our Strategy and Operations — Qoros will require additional capital resources to meet its
operating expenses.”

Qoros’ Strengths

Focus on the Large Chinese Passenger Vehicle Market —China is the largest passenger vehicle market in the world in terms of new units sold, with approximately 22 million domestic

passenger vehicles sold in 2016, representing approximately 31% of the global passenger vehicle market, according to CAAM, CPCA and the International Organization of Motor Vehicle
Manufacturing , or OICA. China is also the fastest growing passenger vehicle market in the world in terms of new units sold with a 18% CAGR from 2008 to 2016, based upon information from CAAM
and CPCA, with respect to vehicles sold (including imports) during the period. Industry analysts expect the growth of China’s passenger vehicle market to continue—for example, CPCA forecasts a 8%
growth rate in 2017. The C-segment, in which Qoros’ vehicle models compete, is the largest passenger vehicle segment in China in terms of units sold. According to CPCA, 13.3 million C-segment
vehicles were sold in China in 2016 (including exports, and excluding imports), representing 61% of China’s passenger vehicle sales in that year. A significant portion of the sales within this segment is
generated from foreign joint venture brands, indicating Chinese consumers’ preference for vehicles delivering international standards and features.

Modern, high-quality vehicle models specifically-designed for the Chinese urban consumer —Qoros’ vehicle models have been specifically designed to reflect the preferences of young,
modern, urban consumers. Qoros has developed a vehicle product concept that Qoros believes provides its drivers with international quality, an innovative customer experience and expressive design:

·

·

·

International Quality: Qoros has engaged global companies in both the automotive and non-automotive industries to facilitate the development and design of its vehicle platform. As
evidence of Qoros’ successful engineering efforts, the Qoros 3 Sedan has been recognized for its outstanding vehicle safety according to European standards, having received the Euro
NCAP’s maximum five-star rating. In 2016, the Qoros 3 Sedan was awarded a China Eco-Car Assessment Programme (C-ECAP) Gold Medal Rating by the China Automotive Technology
& Research Center based on a comprehensive assessment of the vehicle’s performance indicators, including cabin air quality, fuel economy and emissions.

Expressive Design: Qoros has designed its vehicles to reflect the preferences of the Chinese C-segment consumers. In 2016, Qoros continued to earn recognition for its design. For
example, the Qoros 3 City SUV won an honorable mention for the Red Dot Award and the Qoros 5 SUV won a design award at the 2016 Automotive Brand Concept. In addition, Qoros'
concept vehicles, including NEV concept vehicles and the Qoros 3 City SUV QamFree, won design awards in 2016.

Innovative Customer Experience: All of Qoros’ vehicles are equipped with a MMH, including a touch screen with swipe gestured control HMI, and most Qoros vehicles are equipped with
the “QorosQloud,” a cutting-edge telematics and cloud-based entertainment and services system that delivers a variety of free (e.g., cloud-enhanced navigation, car care, and social sharing)
and premium (e.g., real-time traffic, parking information, cloud-enabled map update, and safe drive monitoring) connectivity features. Qoros believes that the features and the services
provided by the QorosQloud integrates Qoros’ vehicle into the driver’s lifestyle, by virtually connecting the vehicle, the driver and the driver’s digital world.

Flexible platform and scalable manufacturing footprint —Qoros’ vehicle platform reflects the results of Qoros’ intensive research and collaboration with industry experts, enabling Qoros to

efficiently deliver new model variants.

Qoros has developed core competencies within key selected areas (e.g., safety, styling, multimedia, etc.) and outsources many of its non-core operations through relationships that it has

developed with various external engineers and suppliers with technical centers located throughout Europe and China. Outsourcing non-core functions allows Qoros to access technology and service
suppliers as needed, without incurring the costs associated with maintaining such research and development capacity or capacity expansion on a full-time basis. Qoros also collaborates and sub-contracts
with several engineering firms for its product development activities. Qoros sources the component parts necessary for its vehicle models from over 100 global suppliers, which are typically European-
based, with manufacturing facilities in China. Qoros aims to establish long-term relationships with its suppliers as a means of building loyalty, achieving competitive pricing, and achieving component
quality and timeliness of delivery. Qoros’ strategic relationships and outsourcing permits it to maintain a lean and relatively flat organizational structure.

143

 
 
 
 
 
 
 
 
 
 
 
Additionally, Qoros’ vehicle platform has been designed to support the development and production of each of Qoros’ planned C-segment models and can be modified into a D-segment

platform with relatively minor adjustments. Qoros constructed its manufacturing facility in Changshu, China, which it also designed in consultation with various international consultants with extensive
experience in the development of automobile production facilities in China and globally. Qoros’ manufacturing facility has a technical capacity of 150 thousand units per annum, which can be increased
to approximately 220 thousand units per annum through the utilization of different shift models (and further increased through additional shift optimizations and improvements in workday efficiency)
and can, subject to Qoros’ receipt of government approval, be further increased to up to approximately 440 thousand units per annum through a second stage plant expansion together with an optimized
work shift model.

International and domestic management team with significant industry experience —Qoros is managed by a highly experienced management team with decades of experience in leading

global businesses within the automotive and high-tech industries and Qoros’ management team is critical to its success. Qoros believes that its management team’s experience contributes to Qoros’
ability to effectively execute Qoros’ current development plan.

Qoros’ Strategies

Ramp up Qoros’ sales by expanding Qoros’ dealer network and establishing the Qoros brand — Qoros’ commercial launch included the launch of Qoros’ C-segment models, the Qoros 3
Sedan, the Qoros 3 Hatch and the Qoros 3 City SUV. In March 2016, Qoros entered the C-segment SUV market with the Qoros 5 SUV. Qoros sold approximately 24,000 vehicles in 2016, as compared
to approximately 14,000 in 2015, and Qoros intends to continue to expand its dealer network, and build up its sales and service infrastructure to further ramp up its sales.

Qoros is continuing to focus on the sales of the Qoros models that have been launched, as well as on its customer awareness and outreach efforts. Qoros is also continuing to develop its dealer
network, targeting those regions and cities that have been identified by Qoros as having high sales potential within the C-segment. Qoros intends to increase the size of its dealer network by expanding
into smaller Chinese cities (e.g., Tier 3 and Tier 4 cities) and creating incentives for its high-performing dealers to open additional points of sales. The construction and operation of Qoros’ dealerships
are financed by Qoros’ dealers themselves, with sales rebates received from Qoros if the dealers achieve certain purchase targets or meet certain other criteria, resulting in the financial commitment of
dealers to the commercial success of Qoros’ vehicle models. As of December 31, 2016, Qoros’ dealerships included 115 points of sales, 18 additional points of sales under construction and
Memorandums of Understanding with respect to the potential development of 18 additional points of sales. Qoros intends to partner with its dealers to continue to promote the Qoros brand at the regional
level, using a variety of marketing channels, including social media and e-commerce platforms.

Leverage platform to develop additional vehicle models, including electric vehicles —Qoros’ long-term strategy contemplates the expansion of Qoros’ vehicle portfolio through the
introduction of additional vehicle models, including electric vehicles, using Qoros’ existing platform. By using its existing scalable platform, Qoros can develop new models in an efficient manner, as its
platform permits Qoros to develop new models with varying and distinctive features, while making only minor adjustments. The Qoros platform, for example, has been used to develop all of Qoros’
vehicles. Furthermore, in January 2016, Qoros created an NEV business division to focus on the development of efficient, cost-effective electric cars. Qoros’ platform may be used to develop an NEV
model pending the receipt by Qoros of further investment.

Overview of the Chinese Passenger Vehicle Market

Qoros is currently focused on the Chinese passenger vehicle market, which has experienced rapid growth in recent years driven by significant expansion of the Chinese economy. Today, China

is one of the largest and fastest growing passenger vehicle market in the world in terms of units sold. Based upon information from CAAM and CPCA, the domestic sales volume of passenger vehicles
grew from approximately 6 million vehicles (including imports) in 2008 to 22 million vehicles (including imports) in 2016, representing a CAGR of 18%, and is expected to continue to grow.

144

 
 
 
 
 
 
 
 
Factors Driving Growth in the Chinese Passenger Vehicle Industry

Qoros believes the following factors have contributed to the growth of the Chinese passenger vehicle industry:

Rapid Economic and Purchasing Power Growth

High GDP growth in China over the past decade has resulted in increased personal wealth and purchasing power. According to the NBSC, China’s nominal GDP increased from RMB13,582

billion in 2003 to RMB74,413 billion in 2016. According to the NBSC, the annual disposable income per capita in Chinese urban households increased from RMB24,565 in 2012 to RMB33,616 in 2016,
representing an increase of 31%. If the Chinese economy continues to grow, corresponding personal wealth generation will support greater demand for passenger vehicles, which will accelerate the
expansion of China’s passenger vehicle industry.

In 2015 and 2016, China’s GDP grew at its lowest rate since 1990, according to the NBSC. For information on the risks related to China’s economic growth, see “ Item 3D. Risk Factors—Risks

Related to Our Interest in Qoros—The economic, political and social conditions in China affect Qoros’ business. ”

Low Penetration Rate Implies Long-Term Growth Potential

Although China’s passenger vehicle market is the largest in the world by country (in terms of units sold), China’s penetration rate of vehicles as a proportion of its population is still relatively

low, at approximately 10% at the end of 2014. According to OICA, the penetration rate of more mature economies, by comparison, typically ranges from 55% (in the case of Japan and Korea) to 81% (in
the case of the United States), which indicates significant growth potential for the passenger vehicle market in China.

Increased Urbanization

Urbanization within China has created significant opportunities for the passenger vehicle industry as urban residents have shown a tendency for greater mobility. China has become increasingly

urbanized over the years. According to the NBSC, from 2003 to 2016, China’s urbanization rate has increased from approximately 40% to approximately 57%, with an urban resident population of
approximately 793 million in 2016.

Market Segmentation of the Chinese Passenger Vehicle Industry

The Chinese passenger vehicle market, in line with international markets, can be separated into the following segments: large-size and mid- to large-size (E-segment), mid-size (D-segment),

compact (C-segment), small-size (B-segment) and mini (A-segment) models based on the size of the vehicles and their typical engine displacement. The following table sets forth the major categories of
passenger vehicles and key features.

Category
Mini   
Small-size  
Compact  
Mid-size   
Mid- to large-size   
Large-size  

  Vehicle category 
A
B
C
D
E
E

Wheel base (millimeter)
2,000 – 2,300
2,300 – 2,500
2,500 – 2,700
2,700 – 2,900
2,800 – 3,000
Above 3,000

  Length of vehicles (millimeter)  
Below 4,000
4,000 – 4,300
4,200 – 4,600
4,500 – 4,900
4,800 – 5,000
Above 5,000

Engine displacement
(liter) (excluding turbo)
Below 1.0
1.0 – 1.5
1.6 – 2.0
1.8 – 2.4
Above 2.4
Above 3.0

145

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
With 22 million vehicles (including exports and excluding imports) sold in 2016, China’s C-segment market, which Qoros is initially targeting, is one of the largest C-segment markets in the

world and represents, by far, the largest segment within the Chinese automotive market. The C-segment has also been one of China’s fastest growing segment over the past decade, with a CAGR of 24%
from 2008 to 2016 according to CPCA. Qoros believes that the C-segment’s primary attractiveness in China results from its delivery of the combination of value for money with sufficient comfort and
space for families.

Within the C-segment, Chinese consumers have shown a strong consumer preference for sedans, which, according to CPCA, represented approximately 49% of all C-segment sales in 2016
(including exports and excluding imports). An important trend over recent years has been the high growth in SUV demand which, according to CPCA, represented approximately 39% of C-segment
sales in China in 2016 (including exports and excluding imports), as compared to approximately 20% in 2013. In response to consumer demand for SUVs, multiple C-segment SUV models, including
vertical upgrade versions, were introduced in China last year. Sales of C-segment SUVs increased by 38% in 2016 and it is expected that SUVs continue to capture market share.

The Chinese passenger vehicle market is typically further divided into categories, as set forth below. Qoros positions its vehicles within the mid- to high-end of the market.

Segment
Joint venture Brands

Premium   
Mid- to High-end  
Economy  

Local Chinese Brands
Mid- to High-end  
Economy  

Examples of Brands

  Mercedes Benz, BMW, Audi, Cadillac
  Volkswagen, Nissan, Buick, Toyota, Honda, Hyundai
  Suzuki

  Roewe, Senova, MG
  BYD, Geely, Great Wall

The role of joint venture brands is particular to the Chinese automotive market, as foreign automotive OEMs are only allowed to establish local production through joint ventures with local

manufacturers. Joint venture brands participate in the larger and more expensive market segments of the Chinese passenger vehicle market, and a significant portion of the sales within these segments are
generated from foreign joint venture brands. Chinese consumers have indicated a preference for foreign joint venture brands as a result of their perceived higher quality and technology, as well as their
higher prestige. Local brands participate primarily in the economy price range, with demand mainly driven by first-time car buyers, often located in tier 3 (those with populations ranging from 4-10
million, including subsidiary counties and towns) and tier 4 (those with populations ranging from 2-6 million, including subsidiary counties and towns) cities, which typically have lower vehicle
penetration rates than the larger tier 1 and tier 2 cities.

146

 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth estimated market share in the Chinese automotive market by vehicle segment for joint ventures and local brands:

New Energy Vehicle Market in China

The Chinese central government has stated that the NEV market is critical for the development of the Chinese automobile industry and China’s economic growth, and has implemented a

number of policies to promote the growth of the market. Sales of NEV cars (which includes plug-in and battery electric vehicles) increased from approximately 177,000 units in 2015 to approximately
324,000 units in 2016, representing a growth rate significantly higher than that of the internal combustion engine car.

Chinese national and regional governments have implemented various policies to promote the growth of the NEV market, including lowering purchase prices and decreasing the running costs

for private customers through purchase subsidies from central and local governments and tax cuts. However, a number of these subsidies are expected to be gradually phased out over the next few years,
which may affect the demand for NEVs in China.

Chinese national and regional governments have also granted free license plates in cities which have quotas or extra costs for new car registration, exclusive license plates for NEVs, and

preferential parking access to promote the growth of the NEV market in China. Additional policies to encourage the growth of NEVs are expected to be instituted, as many local governments are under
pressure to reduce CO 2 emissions, urban gridlock and haze. In the near- to mid-term, NEVs may be given traffic privileges and exempted from driving day restrictions.

Meanwhile, OEMs are expected to invest in manufacturing NEVs to meet mandatory fuel economy regulations on corporate average fuel consumption. In October 2015, the Chinese central

government indicated that it needed to improve infrastructure and increase the prevalence of charging facilities to accelerate the development of the NEV market. According to a release from the
National Development and Reform Commission, China expects to construct 4.8 million charging points between 2015 and 2020. Improved NEV infrastructure and access to charging facilities is also
expected to improve the market’s acceptance of NEVs.

Pricing Trends in the Chinese Passenger Vehicle Market

Following years of rapid growth, the Chinese passenger vehicle market experienced reduced growth rates in 2015 due largely to the economic slowdown in China and the volatility of the

Chinese stock market. In response, China’s central government enacted a tax policy to incentivize the sale of domestic vehicle sales by lowering purchases taxes on certain vehicles, including Qoros’
vehicles, until January 1, 2017 from 10% to 5%. In December 2016, the tax incentive was extended for 2017; effective January 1, 2017, the purchase tax will be 7.5%, before increasing to 10% on
January 1, 2018.

During 2016, dealers and OEMs offered customers a variety of inducements for customers to purchase vehicles, including price reductions. In line with many of its competitors, Qoros

announced price reductions on all its vehicle models. In 2017, dealers and OEMs have continued to reduce prices and offer further inducements to purchase vehicles. Qoros expects the downward
pressure on vehicle prices to continue for the next few years.

147

 
 
 
 
 
 
 
 
 
 
Qoros’ Description of Operations

Qoros designs, engineers and manufactures a new brand of automobiles manufactured in China, designed to deliver international standards of quality and safety, as well as innovative features.

In 2016, Qoros sold approximately 24,000 cars, as compared to approximately 14,000 cars in 2015.

Models

Qoros has launched commercial sales of its C-segment models. Qoros' vehicle launches to date include:

· Qoros 3 Sedan –launched in December 2013;

· Qoros 3 Hatch –launched in June 2014;

· Qoros 3 City SUV –launched in December 2014;

· Qoros 5 SUV –launched in March 2016; and

· Qoros 3GT –launched in November 2016.

Qoros has also launched the 2016 model year versions of the Qoros 3 Sedan, the Qoros 3 Hatch and the Qoros 3 City SUV.

Qoros’ platform has been designed to enable the efficient introduction of new models in the C- and D-segments. Qoros developed its vehicles in accordance with international standards of

quality and safety, as well as innovative features, working in conjunction with global entities from both automotive and non-automotive industries.

The Qoros 3 Sedan’s vehicle performance is competitive in its segment, particularly with respect to fuel economy, acoustics, aerodynamics, climatic comfort, and braking performance. The

Qoros 3 Sedan received a 5+ star safety rating in the China—New Car Assessment Program (C-NCAP)’s 2015 crash test, becoming the first car ever to achieve the 5+ rating against the demanding 2015
assessment protocol.

The Qoros 3 Sedan’s design provides one of the most spacious interiors in the segment. In particular, the large shoulder room and rear leg room reflect important Chinese C-segment consumer

preferences. The Qoros 3 Sedan is also one of the widest vehicles in its segment.

QorosQloud

All of Qoros’ vehicles are equipped with a MMH, including a user friendly 8-inch capacitive touch screen with swipe gestured control HMI. Most of Qoros vehicles are equipped with the

“QorosQloud,” a cutting-edge telematics and cloud-based entertainment and services system that delivers a variety of free (e.g., cloud-enhanced navigation, car care, and social sharing) and premium
(e.g., real-time traffic, parking information, cloud-enabled map update, and safe drive monitoring) connectivity features. Qoros believes the features and the services provided by the QorosQloud
integrates Qoros’ vehicle into the driver’s lifestyle, by virtually connecting the vehicle, the driver and the driver’s digital world. QorosQloud creates a digital ecosystem that, among other features, seeks
to provide the driver with the following experience:

·

·

·

convenience : Qoros provides its customers with a variety of free services designed to simplify navigation and car care, including offering trip planning, navigation services which, after
parking, can continue to provide the user with directions via the use of mobile devices, and smart points of interest. Qoros also provides its customers with real-time monitoring of car
service maintenance and driving behavior to enhance passenger safety. Qoros has developed a web-based customer communication platform, which enables Qoros to leverage vehicle usage
data to provide targeted messages to Qoros drivers;

social and fun : Qoros provides its customers with free services to connect Qoros drivers with their friends and other Qoros drivers, offering check-in, shared trips and other social
networking features. For example, the QorosQloud includes the “Pick Me Up” feature, which provides navigation services to Qoros drivers who have offered rides to their friends on the
WeChat messaging and calling app; and

access to Qoros World : The QorosQloud is integrated with the WeChat messaging and calling app, allowing Qoros drivers to access QorosQloud functions through their WeChat account.  
This feature enables drivers to plan and schedule car maintenance and access Qoros' emergency assistance services.

148

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The QorosQloud also provides drivers with remote access to their vehicle, providing key information with respect to the vehicle’s location, owner’s manual, warranty information, and vehicle

diagnostics and maintenance, as well as, for an additional fee, enabling drivers to access real-time information such as traffic and surrounding points of interest from the vehicle.

Drivers of Qoros’ vehicles may also purchase premium connectivity features, such as access to dynamic, real-time parking and traffic information and live map updates, representing an

additional source of revenue for Qoros.

NEV Models

In January 2016, Qoros created an NEV business division to focus on the development of efficient, cost-effective electric cars. Qoros' strategy contemplates the development of NEVs, pending

the receipt of further investment.

In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional
vehicle manufacturing base. Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association,
among other agreements. For further information, see “ —Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

Information Technology

Qoros has designed a comprehensive IT infrastructure to support its operating model, including product processes, customer order processes, sales & service processes, and enterprise
management and support processes. Qoros maintains all business-critical systems, including its engineering, purchasing, and production control systems. Additionally, to support its commercial sales,
Qoros maintains marketing and sales systems, including its dealer management system, dealer portal, customer relation management system, and spare part and warranty systems.

Qoros’ Manufacturing: Property, Plants and Equipment

Qoros conducts its vehicle manufacturing and assembly operations at its 150 thousand unit per annum, 790,000 square meter factory by land size in Changshu, China, for which it has a land use
right until March 4, 2062. Qoros’ western-standard manufacturing facility incorporates comprehensive, flexible capabilities, including body assembly, paint shop, final vehicle assembly and end-of-line
testing. Qoros’ paint shop uses a nanoceramic conversion coating process for metals, and the B1B2 compressed painting process, in which two layers of wet-to-wet basecoats are applied instead of the
traditional application of a basecoat layer and a primer coating, to achieve production efficiency, improve painting quality, and minimize environmental impact. Qoros’ paint shop also utilizes advanced
equipment and robots, to contribute to the overall effectiveness and efficiency of Qoros’ painting operations.

Qoros will adjust the manufacturing capacity of its manufacturing facility in accordance with the demand for its vehicles. Currently, the base installed volume of vehicles that can be

manufactured, or the “technical capacity,” of Qoros’ manufacturing facility is 150 thousand units per annum. Through alterations of operating parameters, such as the utilization of different shift models,
the volume of vehicles manufactured can be increased to approximately 220 thousand units per annum (and further increased through additional shift optimizations and improvements in workday
efficiency). This represents the manufacturing facility’s “shift capacity.” Subject to approval from the relevant Chinese government authorities and additional investments in phase two of the
manufacturing facility, the production capacity of Qoros’ manufacturing facility can subject to Qoros’ receipt of government approval, be further increased to up to approximately 440 thousand units per
annum through a second stage plant expansion together with an optimized work shift model.

Qoros’ Sourcing and Suppliers

Qoros sources the component parts necessary for its vehicle models from over 100 global suppliers. A majority of Qoros’ suppliers are European-based, with manufacturing facilities in China.

Qoros aims to establish long-term relationships with its suppliers as a means of building loyalty, achieving competitive pricing, and achieving component quality and prompt delivery. Qoros has
implemented enterprise resource planning and management software to automate its procurement and inventory processes and to integrate them with its financial accounting system. This resource
management system allows Qoros to reduce and control costs by maintaining minimal inventories of the components and parts needed to conduct its manufacturing operations.

Qoros also collaborates and sub-contracts with several engineering firms for its product development activities.

Qoros utilizes a “managed outsourcing” model for the development of its vehicle models, which Qoros believes increases its operational effectiveness and efficiency. Under its “managed

outsourcing” model, Qoros utilizes the knowledge it has acquired from its extensive customer research to develop its vehicles, including defining corresponding vehicle and subsystem level performance
targets, formulating detailed design verification/testing plans, and managing vehicle development programs. The detailed implementation work necessary to develop Qoros’ vehicles is then carried out
by engineering service providers and/or related suppliers in accordance with Qoros’ requirements. For information on Qoros’ relationship with, and the risks related to, Qoros’ suppliers, see “ Item 3.D
Risk Factors—Risks Related to Our Interest in Qoros—Qoros is dependent upon its suppliers .” For information on claims brought by certain of Qoros’ suppliers, see “ —Qoros’ Legal Proceedings—
Claims by Service Providers. ”

149

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros’ Commercial Agreements with Chery

Qoros sources its engines and certain spare parts from Chery in the ordinary course of Qoros’ business, and has entered into various commercial agreements with respect to the provision of such

supplies from Chery. Qoros has amounts payable to Chery in the amount of RMB374 million as of December 31, 2016.

Additionally, Qoros entered into a platform sharing agreement with Chery, pursuant to which Qoros provides Chery with the right to use Qoros’ platform in exchange for a fee. Qoros may also

enter into additional commercial arrangements and agreements with Chery, or parties related to it, in the future.

Qoros' business plan contemplates further reliance on Chery and its platform and personnel in connection with Qoros' operations and development of new vehicle models.

For further information on Qoros’ commercial arrangements with Chery, see Note 30 to Qoros’ consolidated financial statements, included in this annual report. For further information on the

risks related to Qoros’ commercial agreements with Chery, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros has entered into certain arrangements and agreements with
Chery .”

Qoros’ Patents and Licenses

Qoros owns the intellectual property rights related to motor vehicles that it has independently developed (including HMI, electric powered motor vehicles and relevant motor vehicles platforms,

parts, components and accessories for motor vehicles) and also owns any and all brands, trade names, trademarks, or emblems developed in connection with, or with respect to, any of its vehicles.

Qoros has filed trademark applications for Qoros major trademarks (e.g., QOROS, Qoros logos) and other trademark related to Qoros business in Asia (including Australia/New Zealand),

Europe, Middle East, North America, South America, Africa, etc. “QOROS,” “Qoros Auto” and the Qoros logo have been registered throughout Europe and Asia.

Qoros has pledged, and, in the future, may further pledge, certain of its intellectual property as collateral for its financing. For information on the risks related to Qoros’ ownership of its
intellectual property, including the risks relating to Qoros’ pledging of its rights in certain of its patents, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros’ success depends, in
part, upon its ability to protect, and maintain ownership of, its intellectual property .”

Qoros’ Marketing Channels

Qoros has an integrated product, marketing and communication strategy. Qoros’ centralized, in-house marketing team aims to utilize its market research and:

·

·

·

·

generate demand for Qoros’ vehicles and drive leads to Qoros’ dealerships and sales teams;

build long-term brand awareness and develop and manage Qoros’ reputation;

employ effective marketing strategies in a cost-efficient manner; and

use Qoros’ web-based customer communication platform as part of its customer relationship management initiative.

Qoros intends to partner with its dealers to continue to promote the Qoros brand at the regional level, using a variety of marketing channels, including social media and e-commerce platforms.

Qoros continued to participate in major autoshows in 2016. Qoros launched its “Experience the New Premium” brand campaign at the 2016 Guangzhou Auto Show. The campaign, which

intends to promote the Qoros brand to a younger generation of consumers, is underpinned by Qoros’ strategy to provide international standards of quality, expressive design, and an innovative customer
experience.

At the 2016 Beijing Auto Show, Qoros launched a series of innovative technologies and new products, including the innovative QamFree engine technology. The revolutionary QamFree engine

modifies the traditional engine with stronger power and improved fuel economy. Compared with traditional engines with crankshaft-driven valve, the QamFree engine provides various benefits for
consumers, including stronger engine performance and improved fuel economy. In addition, Qoros launched two NEV concepts at the 2016 Beijing Auto Show.

150

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros’ Dealers

Qoros markets its vehicles in China through a network of independent authorized retail dealers, with whom Qoros enters into non-exclusive relationships. As of December 31, 2016, Qoros had

74 full-service dealer stores, providing Qoros’ customers with dealers and authorized salesmen, showrooms, and service and parts, under one roof; the remaining portion of Qoros’ dealership network
comprises only showrooms. Locations of Qoros’ dealerships have been identified in Qoros’ extensive research, with a view to optimizing and increasing Qoros’ market coverage. As of December 31,
2016, Qoros’ dealerships included 115 points of sales, 18 additional points of sales under construction and Memorandums of Understanding with respect to the potential development of 18 additional
points of sales. As part of its strategy to increase its sales, Qoros intends to increase the size of its dealer network by expanding into smaller Chinese cities (e.g., Tier 3 and Tier 4 cities) and creating
incentives for its high-performing dealers to open additional points of sales.

Qoros enters into a contract with each authorized dealer, agreeing to sell to the dealer all specified vehicle lines at wholesale prices and granting to the dealer the right to sell those vehicles to

retail customers from an approved location. It is expected that Qoros’ dealers will offer the full vehicle model lineup offered by Qoros. Authorized Qoros dealers also offer parts, accessories, service and
repairs for Qoros’ vehicles, using genuine Qoros parts and accessories obtained directly from Qoros. Qoros’ dealers are authorized to service Qoros’ vehicles under Qoros’ limited warranty program, and
those repairs are required to be made only with Qoros’ parts. In addition, most of Qoros’ dealers also provide their customers access to retail financing, vehicle insurance and warranty packages. The
dealership facilities are based on Qoros’ branded construction plans, to ensure consistency and quality, and are constructed by the dealer using its own capital resources, with sales rebates received from
Qoros (i.e., dealers are entitled to sales rebates from Qoros if they achieve certain purchase targets or meet certain other criteria).

Because dealers maintain the primary sales and service interface with the end consumer of Qoros’ products, the quality of Qoros’ dealerships and its relationship with its distributors are critical

to its success. Qoros conducts rigorous training for dealers with respect to its vehicle models and ancillary and aftersales products, most of which are required to be completed prior to the opening of a
dealer’s operations. Qoros’ training program for dealers includes (i) a step-by-step course plan, which includes an initial launch training, (ii) a three leveled core curriculum with a final certification test,
and (iii) subject-specific training when appropriate (e.g. the launch of a new product, a QorosQloud upgrade, etc.). Dealers are also expected to undergo subject-specific trainings throughout subsequent
years. Pursuant to the terms of its standard dealer arrangement, Qoros’ dealers are required to periodically participate in ongoing training and educational sessions regarding Qoros, its vehicle models,
and the servicing of its vehicles.

For information on the risks related to Qoros’ relationship with its dealers, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros depends upon a network of independent

dealers to sell its automobiles .”

Aftersales and Services

Qoros provides aftersales and services through its network of authorized dealers. Qoros drivers can utilize their QorosQloud to respond to service invitations, make and secure appointments, and

report issues on their vehicle in advance of any servicing appointments. Aftersales and services are provided pursuant to warranties and for a fee where warranty coverage is not available.

In 2016, Qoros developed a web-based customer communication platform, which enables Qoros to leverage vehicle usage data to provide Qoros drivers with targeted messages via various

channels, including e-mail and SMS, in-app and in-car MMH messaging. Qoros intends to use its customer communication platform as part of its customer relationship management initiative.

Qoros’ Customers

Qoros’ intended target audience consists of Chinese consumers.

Target purchasers of the Qoros 3 Sedan are generally urban residents between the ages of 25 and 35, with an average-to-high level of income, while target purchasers of the Qoros 3 Hatch are

generally female customers with higher-than-average education and income.

Qoros is also targeting a diverse group of fleet-sale customers, including car rental companies (including those serving Chinese government agencies), corporate entities, and other large groups.

Retail Financing Program

Customer financing is available through dealers and financing packages are also offered by Chery Huiyin Motor Finance Service, Co. Ltd., or Huiyin, a Wuhu Chery affiliate. Qoros does not

provide direct financing to customers at this time.

151

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros has provided a guarantee to Huiyin for financing arrangements between Huiyin and selected Qoros dealers. In the case of defaults under such retail financing program between March

2016 and February 2018, Qoros may need to compensate Huiyin for an amount up to the actual loss incurred. Qoros has not incurred a loss in relation to these financing arrangements.  For further
information on Qoros’ guarantee with respect to the retail financing program, see Note 30 to Qoros’ consolidated financial statements, included in this annual report.

Warranty Program

Qoros provides a 36-month or 100,000 km limited warranty with its Qoros 3 models and a 72-month or 100,000 km limited warranty for the Qoros 5 SUV. Qoros’ limited warranty, which is

similar to those offered by other international OEMs, is subject to certain limitations, exclusions or separate warranties, including certain wear and tear items, such as tires, brake pads and general
appearance, and battery performance, and accessories, and is intended to cover parts and labor to repair defects in material or workmanship.

Qoros’ Competition

The passenger vehicle market in China is highly competitive, with competition from many of the largest global manufacturers (acting through joint ventures), including European, U.S., Korean

and Japanese automakers, and established domestic manufacturers. As the size of the Chinese automotive market continues to increase, Qoros anticipates that additional competitors, both international
and domestic, may seek to enter the Chinese automotive market and that market participants will act to maintain or increase their market share. For information on the risks related to Qoros’ competition,
see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros’ business is subject to intense competition. ”

The recent slowdown in the Chinese economy and conditions in the passenger vehicle market have resulted in increased competition in China's automotive market. In 2016, a number of
Chinese car manufacturers, including Qoros, announced price reductions on their vehicles. In 2017, dealers and OEMs have continued to reduce prices and offer further inducements to purchase vehicles.
Qoros expects the downward pressure on vehicle prices to continue for the next few years.

Qoros’ Seasonality

In recent years, demand for new cars in the Chinese automobile industry peaks during September to January and March to April. The Chinese automobile industry generally experiences

reduction in demand during February and July. Given Qoros' limited operating history and volume of sales, demand for Qoros' vehicles has not been significantly affected by seasonality.

Qoros’ Joint Venture Agreement

We are party to a Joint Venture Agreement, entered into on February 16, 2007 (which has since been amended) that sets forth certain rights and obligations of each of Quantum, the wholly-

owned subsidiary through which we own our equity interest in Qoros, and Wuhu Chery with respect to Qoros, or the Joint Venture Agreement. The Joint Venture Agreement is governed by Chinese law.
Pursuant to the terms of the Joint Venture Agreement, each of Kenon, through Quantum, and Wuhu Chery is required to invest pro rata amounts into Qoros at various and specified intervals. The Joint
Venture Agreement also contains provisions regarding (i) the joint approval of “substantial matters” (e.g., changes to Qoros’ articles of association; the merger, amalgamation, split or public offering of
Qoros) via unanimous approval from Qoros’ board of directors; (ii) the selection of Qoros’ Board of Directors and senior management; (iii) a prohibition against the sale/assignment/transfer/pledge of
either party’s interest in Qoros, subject to certain exceptions, and (iv) indemnification, confidentiality, non-competition, and liquidation processes.

Pursuant to the terms of our Joint Venture Agreement, we have the right to appoint three of Qoros’ six directors and Wuhu Chery has the right to appoint the remaining three of Qoros’ six

directors. We also have the right to, together with Wuhu Chery, jointly nominate Qoros’ Chief Executive Officer and Chief Financial Officer. The joint nomination of Qoros’ Chief Executive Officer and
Chief Financial Officer are each subject to the approval of Qoros’ board of directors by a simple majority vote.

Additionally, Wuhu Chery may, in the event of the termination of the Joint Venture Agreement, purchase our interest in Qoros at an agreed upon price or at the price determined by an

independent appraiser selected or appointed as applicable, pursuant to the valuation procedure set forth in the Joint Venture Agreement. The nationalization or confiscation, in whole or in substantial
part, of Qoros’ assets, or Qoros’ bankruptcy, for example, are all termination events that may trigger Wuhu Chery’s purchase rights. Furthermore, the Joint Venture Agreement also contains provisions
relating to the transfer and pledge of Qoros’ shares, the appointment of executive officers and directors, and the approval of “substantial matters,” which may prevent us from causing Qoros to take
actions that we deem desirable.

Each of Kenon and Chery had committed to provide Qoros with capital contributions. Kenon and Chery have satisfied their individual committed capital contributions (assuming the conversion

of certain convertible shareholder loans), having each invested RMB5.9 billion in Qoros as of December 31, 2016 via capital contributions and/or convertible or non-convertible shareholder loans.

152

 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon and Chery have also guaranteed the full performance and observance by Quantum and Wuhu Chery, respectively, of, and compliance with, all covenants, agreements, obligations and

liabilities applicable to Quantum or Chery, as applicable, under and in accordance with the terms and conditions of the Joint Venture Agreement. As a result, Kenon and Chery are effectively subject to
the terms of the Joint Venture Agreement.

The Joint Venture Agreement will expire in December 2032 and either we or Chery may terminate the Joint Venture Agreement prior to this date, under certain circumstances, and subject to
certain conditions. For further information on the risks related to the Joint Venture Agreement, including the risks related to Chery’s status as a state controlled holding enterprise, see “ Item 3.D Risk
Factors—Risks Related to Our Interest in Qoros—Qoros is a joint venture in which our interest is only 50%. ”

In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional
vehicle manufacturing base. Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association,
among other agreements. Such further investment, if provided, is expected to dilute Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to
Qoros. For further information, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments—Qoros—Agreement with Yibin to Jointly Establish NEV Manufacturing Base .”

Changes to Qoros’ Management

In 2016, Qoros made a number of personnel changes at the executive management level and in the senior management structure.

In March 2017, the board of directors of Qoros appointed Mr. Leon Liu, who previously served as the Chief Operating Officer of Qoros, to serve as the Chief Executive Officer.

For further information on the risks related to Qoros’ management, see “ Item 3.D. Risk Factors—Risks Related to Our Interest in Qoros—Qoros requires qualified personnel to manage its

operations. ”

Qoros’ Legal Proceedings

Claims by Service Providers

During 2016, Qoros was subject to various claims brought by certain of its service providers claiming unpaid amounts. As of December 31, 2016, the total amounts claimed are approximately

RMB6.5 million. Qoros is defending itself against each of these claims.

During 2016, Qoros settled various outstanding claims previously brought by its service providers. As of December 31, 2016, Qoros has amounts payable of approximately RMB124 million in

connection with such settlements. For further information on the risks related to Qoros’ relationship with its suppliers, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is
dependent upon its suppliers. ”

Eisenmann Proceedings

In February 2016, Eisenmann SE, or Eisenmann, brought a claim against Geico Taikisha and Qoros before the Suzhou Intermediate People’s Court of Jiangsu Province, alleging that Geico

Taikisha and Qoros infringed upon Eisenmann’s patents through Qoros’ use of J-Flex equipment which it purchased from Geico Taikisha. Geico Taikisha and Qoros are contesting this action, and have
filed an invalidation petition of the Eisenmann patent before the State Intellectual Property Office of the People’s Republic of China. Should the court rule in favor of Eisenmann, Qoros could be
required to cease its use of the J-Flex equipment, which Qoros uses to dip and transport vehicle bodies on the pre-treatment and paint lines of its manufacturing facility. Qoros may also be required to
pay monetary damages, but Qoros believes that Geico Taikisha would be required to indemnify it for any such damage award and the associated legal costs. For further information on the risks
associated with Qoros’ dependence on systems, components and parts to conduct its manufacturing operations, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is dependent
upon its suppliers. ”

Qoros’ Regulatory, Environmental and Compliance Matters

Qoros is subject to regulation, including environmental regulations, in China and the Jiangsu Province. Such regulations are becoming increasingly stringent and focus upon the reduction of

emissions, the mitigation of remediation expenses related to environmental liabilities, the improvement of fuel efficiency, and the monitoring and enhancement of the safety features of Chinese vehicles.
For example, the Chinese government has introduced stringent fuel consumption regulations which will take effect in 2020 for vehicles sold by Chinese automotive manufacturers. In order to comply
with these fuel consumption standards, Qoros may need to alter the composition of its fleet of vehicles, which may include developing an electric vehicle. Qoros’ facility, activities and operations are
also subject to continued monitoring and inspection by the relevant Chinese authorities. Qoros believes that it is in compliance with applicable Chinese government regulations.

153

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Additionally, certain of Qoros’ corporate activities are subject to the regulation and approval of the competent authorities in China. Such activities include capital increases by loans to, or
investments in Qoros, changes in the structure of Qoros’ ownership, increases in the production capacity, construction of Qoros’ production facilities, registration and ownership of trademarks, relocation
of Qoros’ head office, the formation of subsidiaries, and the inclusion of Qoros’ products in the national catalogue for purposes of selling them throughout China.

As Qoros' strategy contemplates the development of an NEV, Qoros will be subject to the laws, regulations and policies applicable to NEVs in China. For instance, in recent years, the Chinese

government has offered large subsidies for purchases of electric vehicles. However, these subsidies are expected to be gradually phased out over the next few years, which may affect the demand for
NEVs in China. Should Qoros proceed with developing and selling electric vehicles, Qoros will also need to obtain various permits and approvals to develop and sell an electric vehicle and will be
subject to a new regulatory regime, including requirements relating to, among other things, battery, electric motor and control system, vehicle safety and efficiency testing. For further information on
Qoros’ regulatory, environmental and compliance risks, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is subject to Chinese regulation and its business or profitability may
be affected by changes in China’s regulatory environment .”

ZIM

We have a 32% stake in ZIM, an international shipping company in which IC held an approximately 99.7% equity interest prior to ZIM’s restructuring on July 16, 2014, which reduced ZIM’s

outstanding indebtedness and liabilities (face value, including future off-balance sheet commitments in respect of operational leases and with respect to those parties participating in the restructuring)
from approximately $3.4 billion to a remaining balance of approximately $2 billion. As a result of the completion of ZIM’s restructuring in July 2014, IC’s equity interest in ZIM was reduced from
99.7% to 32% and ZIM is reflected as a discontinued operation in our results of operations for all periods prior to June 30, 2014. ZIM’s results of operations for the six month period ended December 31,
2014, and all periods subsequent thereto, are reflected in our share in income (losses) of associated companies, net of tax.

ZIM is a global container liner company that operates in select and niche markets. ZIM was founded in Israel in 1945, and has over 70 years of experience in the shipping industry providing
customers with seaborne transportation and logistics services and solutions. As of December 31, 2016, ZIM operated 72 vessels (of which 7 were owned and 65 were chartered) with a total shipping
capacity of 322,566 TEUs. As of December 31, 2016, ZIM chartered 90% of its capacity, and approximately half of its charter leases by capacity have durations of less than one year.

As of December 31, 2016, ZIM operated a global network of approximately 60 weekly lines, calling at approximately 150 port of calls in approximately 70 countries. ZIM’s network includes

strategically located hubs and regional feeder lines to increase geographical coverage. ZIM has cooperation agreements with other leading container liner companies and alliances, allowing ZIM to
increase its fleet utilization by sharing capacity, expand its service offering and benefit from cost savings. ZIM’s vessels have capacities ranging from less than 1,000 TEUs to approximately 10,000
TEUs, allowing ZIM to match the markets’ dynamics and ensure high utilization. Within ZIM’s global network, ZIM offers a variety of services, including land transportation and logistical services, as
well as specialized shipping solutions, such as the transportation of out-of-gauge cargo, refrigerated cargo and hazardous cargo.

Pursuant to ZIM’s articles of association, Kenon currently has the right to appoint up to 2 directors to ZIM’s board of directors (even if our interest in ZIM’s share capital otherwise entitles us to

appoint more than 2 directors to ZIM’s board of directors). This right will expire if ZIM’s board of directors is comprised of more than nine directors, in which case Kenon will be entitled (alone or
together with others) to appoint a number of directors that corresponds to its equity interest in ZIM.

ZIM’s Industry Update

The shipping industry continued to experience low margins during 2016, and industry conditions remain challenging due to the historically large supply-demand gap created by the global

financial crisis and subdued trade growth since then, along with the rapid increase of capacity. The oversupply of vessel capacity within the container shipping industry is expected to continue in the near
future as the global fleet continues to increase. In response to overcapacity, a number of carriers cancelled voyages during slower periods of demand. As a result, the idle fleet increased dramatically
during 2016. In addition, carriers and vessel owners increased scrapping, as the number of vessels sold for demolition in 2016 reached approximately 190 vessels (approximately 655,000 TEUs), as
compared to approximately 90 vessels scrapped in 2015 (representing approximately 192,000 TEUs).

154

 
 
 
 
 
 
 
 
 
 
The dramatic decrease in bunker prices since 2014 has had both negative and positive impacts on industry supply and demand trends. On the one hand, the shipping industry, which is currently
characterized by oversupply, suffers, as low bunker prices result in additional downward pressures on freight rates, as customers put pressure on shipping companies to reduce their freight rates. On the
other hand, low bunker prices positively impact shipping companies’ cost structures and support household spending that increases private consumption, which, in turn, results in higher demand for
goods. Although bunker prices were lower in 2016 than in 2014 and 2015, bunker prices increased moderately throughout 2016. Further increases in bunker prices may affect ZIM's margins.

As a result of the challenging supply-demand balance and the current low bunker prices, during 2016, freight rates reached their lowest level since 2009. However, freight rates have begun to

increase moderately during the second half of 2016, as a result of, among other factors, carriers’ attempts to handle the overcapacity by increasing idle fleet levels and intensive scrapping activity, as well
as the receivership of Hanjin, one of the leading companies in the shipping industry.

In addition, the container shipping market has experienced significant consolidation as carriers look for operational savings that will improve efficiency and margins. In recent years, the

shipping industry has experienced extensive industry consolidation and M&A activity, resulting in rising market concentration levels.

In line with this trend, many of the largest carriers are also members of newly formed strategic alliances. Two newly formed groups, the Ocean Alliance (consisting of COSCO Shipping, CMA
CGM Shipping, Evergreen Marine and Orient Overseas Container Line) and The Alliance (consisting of Hapag Lloyd, Yang Ming MOL, NYK Line and K Line Shipping) are expected to compete with
the existing ‘2M’ alliance of Maersk and MSC, which has also recently entered into a strategic cooperation with Hyundai Merchant Marine.

ZIM’s Description of Operations

ZIM operates in the liner shipping sector and provides container space/allocation in connection with its operation of regular routes between fixed destinations, within and between trade zones,
according to set schedules and anchoring at ports in accordance with a predetermined schedule and according to either pre-determined or spot rates. ZIM operates globally, although its key operational
activities are conducted in the Trans-Pacific trade zone, the Asia (including Indian Sub-Continent)-Black Sea/ East Mediterranean Sea trade zones and the Intra-Asia trade zone. In 2016, these trade
zones accounted for approximately 70% of ZIM’s total carried volume (measured in TEUs).

ZIM competes with other liner shipping companies to provide transport services to customers worldwide. The market is significantly concentrated with the top five carriers accounting for
approximately 58% of the global capacity, and the remaining top carriers each controlling less than 5% of the capacity as of December 2016. ZIM controls approximately 2% of the global container
shipping capacity and is ranked sixteenth among shipping carriers globally as of January 2017 (in terms of TEU capacity).

To compete in an oversupplied market and to minimize costs, the main containership operators have created, and are continuing to create and enter into alliances of cooperative operational

arrangements. These alliances enable rationalization of the activities of the carriers, realization of economies of scale in the operation of vessels and utilization of port facilities, promotion of technical
and economic progress and greater, more efficient utilization of container and vessel capacity. ZIM is not a member of an alliance. However, ZIM is party to a wide range of operational partnerships,
including vessel sharing agreements, swap agreements, and slot purchase agreements with other carriers in most of the trade zones in which it operates. For further information on the risks related to
competition within the shipping industry and ZIM’s participation in cooperative operational agreements, see “ Item 3.D Risk Factors—Risks Related to Our Other Businesses—Risks Related to Our
Interests in ZIM—ZIM does not benefit from the efficiencies of participating in strategic alliances and the ability to enter into such alliances and the participation in operational partnerships in the
shipping industry may be limited, which may adversely affect ZIM’s business. ” In light of such industry dynamics, ZIM continues to monitor its operational costs and strives to implement additional cost
reduction practices in order to position itself as a more efficient and profitable carrier.

The map below illustrates ZIM’s trade zones of operation, as of December 31, 2016, and the percentage of TEUs transported by zone:

155

 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth, a description of the major trade zones or sub-trade zones in which ZIM operates, and the distribution of TEUs transported by ZIM within each zone, for each of

2016, 2015 and 2014:

Business Unit
Pacific   

Cross Suez  

Intra-Asia   

Atlantic  

Latin America   

Total   

ZIM’s Description of Fleet

Description of Business Unit

  The Pacific BU consists of the Trans-Pacific trade zone, which covers trade between Asia

(mainly China) and the east coast and west coast of the U.S., Canada, Central America and the
Caribbean

  The Cross Suez BU consists of the Asia-Europe trade zone, which covers trade between Asia
and Europe through the Suez Canal, primarily through the Asia-Black Sea/Mediterranean Sea
sub-trade zone

  The Intra-Asia BU consists primarily of the Intra-Asia trade zone, which covers trade within

regional ports in Asia, as well as trade between Asia and Africa

  The Atlantic BU consists of the Trans-Atlantic trade zone, which covers the trade between the
Mediterranean to US east and west coasts and the Caribbean, as well as Intra trades which
include the East Mediterranean, West Mediterranean and North Europe and the Mediterranean
to West Africa trade

  The Latin America BU consists of the Intra-America trade zone, which covers trade within
regional ports in the Americas as well as trade between South American east coast and Asia
and the Mediterranean to South America east coast via the Atlantic Ocean

2016
TEU Transported
(%)

2015
TEU Transported
(%)

2014
TEU Transported
(%)

33.6 

16.5 

20.3 

21.4 

8.3 
100.0 

34.7 

15.4 

18.5 

22.4 

9.0 
100.0 

31.0 

21.6 

18.4 

21.7 

7.3 
100.0 

ZIM operates in the liner shipping sector and generates revenue from fees paid to it in exchange for transportation services provided by it (through deployment of its fleet of vessels it owns or

charters to ZIM’s customers). As of December 31, 2016, ZIM’s fleet included 72 vessels (70 container vessels and 2 vehicle transport vessel), of which 7 vessels were indirectly owned by ZIM (through
subsidiaries established for vessel-holding purposes only) and 65 vessels were chartered (5 of these are defined as financial leases). As of the date of this annual report, ZIM had re-delivery dates ranging
from 2017 to 2026. As of December 31, 2016, the total capacity of ZIM’s fleet of vessels (both owned and chartered) was 322,566 TEUs (compared to 369,549 TEUs as of December 31, 2015).

156

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth summary information relating to ZIM’s vessels as of December 31, 2016, differentiating between owned and chartered vessels, and the remaining period of the

charter:

Vessels owned by ZIM   

Vessels chartered from parties related to ZIM

Periods up to 1 year (from December 31, 2016)  
Periods between 1 to 5 years (from December 31, 2016)
Periods over 5 years (from December 31, 2016)   

Vessels chartered from third parties

Periods up to 1 year (from December 31, 2016)  
Periods between 1 to 5 years (from December 31, 2016)
Periods over 5 years (from December 31, 2016)   

Total   

________________________

1. Vehicle transport vessels.

Container Vessels

Number

7 

3 
2 
2 

33 
17 
6 

70 

  Capacity (TEU)  
32,023 

15,592 
10,600 
8,442 

118,470 
87,820 
49,619 

322,566 

Other
Vessels

Total

- 

21   
- 
- 

- 
- 
- 

21   

7 

5 
2 
2 

33 
17 
6 

72 

Industry analysts expect shipping companies’ deployments of larger vessels to increase and, in particular, to increase in certain of the key trade zones in which ZIM operates and intends to
increase its operations. The recent Panama Canal expansion is illustrative of the industry trend towards larger vessels. To remain competitive within these trade zones, ZIM may seek to alter its fleet
composition accordingly.

Chartered Vessels

ZIM charters vessels under charter agreements for varying periods. With the exception of those vessels whose rates were set in connection with ZIM’s 2014 debt restructuring, ZIM’s charter
rates were fixed at the time of entry into the charter, and depend upon market conditions existing at that time. As of December 31, 2016, of the 65 vessels chartered by ZIM under lease arrangements:

·

·

·

59 vessels were chartered under a “time charter,” which consists of chartering the vessel capacity for a given period of time against a daily charter fee, with the crewing and technical
operation of the vessel handled by its owner, including 9 vessels chartered under a time charter from parties related to ZIM;

1 vessel was charted under a “bareboat charter,” which consists of the chartering of a vessel for a given period of time against a charter fee, with the operation of the vessel handled by the
charterer; and

5 vessels were chartered under financial lease agreements.

Subject to any restrictions in the applicable lease arrangement, the charterer determines the type and quantity of cargo to be carried as well as the ports of loading and discharging. ZIM’s vessels

operate worldwide within the trading limits imposed by its insurance terms. The technical operation and navigation of ZIM’s vessels remain, at all times, the responsibility of the vessel owner, who is
generally responsible for the vessel’s operating expenses, including the cost of crewing, insuring, repairing and maintaining the vessel, costs of spares and consumable stores, tonnage taxes and other
miscellaneous expenses.

Fleet Management

ZIM provides its own operational and technical management services for each of the vessels that it owns.

ZIM operates vessels in accordance with the ISM Code and the International Ship and Port Facilities Security Code, or ISPS Code, in addition to developing, implementing and maintaining a

safety management system in accordance with the ISM Code. In addition, ZIM follows the regulations of the International Maritime Organization, or IMO, and intends to make its vessels compliant with
the new IMO regulations expected to come into effect.

Non-Fleet Equipment

In addition to the vessels that ZIM owns and charters, ZIM owns and charters a significant number of shipping containers. As of December 31, 2016, ZIM held 327,658 container units with a

total capacity of 528,496 TEUs, of which approximately 80% were owned by ZIM (including under finance leases) and approximately 20% were chartered.

157

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ZIM’s Customers

In 2016, ZIM had more than 29,000 customers. ZIM’s customers are divided into “direct customers”, including exporters and importers, and “forwarders,” these being non-vessel operating

common carriers (i.e., entities engaged in assembling cargos from various customers and the forwarding thereof through a shipping company). In 2016, 43% of ZIM’s customers (in terms of transported
volume) were “direct customers,” while the remainder were “forwarders.” ZIM does not depend upon any single customer.

ZIM’s Seasonality

Activity in the marine container shipping industry is affected by various seasonality factors. Generally, the first quarter of the calendar year is marked by a decrease in demand for shipping,

primarily due to a decrease in demand from Asia as a result of the Chinese New Year. In the third and fourth quarters, demand for cargo shipping generally increases, primarily due to the holiday periods
in the United States. The third quarter is generally the strongest quarter with respect to shipping demand.

Recently, the seasonality factors have not been as apparent as they have been in the past. The marine shipping market is dynamic and volatile by its very nature and has been marked in recent
years by relative instability. As global trends that affect the shipping market have been changing rapidly in recent years, it remains difficult to predict these trends and the shipping industry’s activities.

Changes to ZIM’s Executive Management

In March 2017, ZIM announced personnel changes at the executive management level. ZIM’s board of directors has nominated Eli Glickman to serve as President and Chief Executive Officer

of the company, effective July 1, 2017. Mr. Glickman will replace Rafi Danieli, the current Chief Executive Officer, who in 2016 had advised ZIM that he would be stepping down from his role. In
addition, ZIM’s Chief Financial Officer Guy Eldar has requested to leave ZIM for personal reasons; at this time, a replacement has yet to be nominated.

ZIM’s Legal Proceedings

Derivative Action Concerning ZIM Restructuring

On August 5, 2014, a petition was submitted to the District Court in Tel Aviv, to approve the submission of a derivative action against IC, ZIM, certain of IC’s independent directors comprising

a special committee of the IC board established to consider ZIM’s restructuring, Millenium Investments Elad Ltd., which owned approximately 46.9% of IC, and Mr. Idan Ofer. The petitioner alleges
that (i) IC’s execution of a related party transaction in connection with the completion of ZIM’s restructuring deviated from the approval of IC’s general assembly, (ii) a condition precedent to such
transaction relating to the transferability of IC’s equity interest in ZIM was not fulfilled, and (iii) as a result, IC has incurred damages of approximately $27 million. The petitioner requested that the
defendants (excluding IC and ZIM) hold a shareholder meeting to approve IC’s execution of such related party transaction or the defendants (excluding IC) compensate IC (in an amount not less than
$27.4 million), as a result of the lower value of ZIM shares that were issued to IC in connection with the restructuring. Additionally, the petitioner alleges that the defendants wrongfully enriched
breached their statutory duties, exceeded their authorization, and/or breached their duty of care and fiduciary duties.

In June 2016, the court rule on the petition and dismissed it, alleging that the petitioner did not establish causation between the damages claimed by the petition and the faults in the conduct of

the special committee. Nonetheless, the court ordered that IC pay the petitioner’s costs in the amount of NIS250,000, as the court claimed the special committee and IC’s board had engaged in
inappropriate conduct. In September 2016, IC appealed this ruling to the Israeli Supreme Court, arguing that the special committee’s conduct was in the best interests of the company in light of the
restructuring.

2016 Class Action—Local Charges

In January 2016, ZIM’s wholly-owned agency in Israel, along with other third party shipping agencies, was served with a motion approving the filing of a class action. The applicant alleges,

among other things, that for the previous seven years, the agency breached applicable port regulations by charging customers higher rates for services rendered than are allowed under the regulations and
charging for services which are not included in the list of services detailed in such regulations. Given the early stage of the proceedings, ZIM’s management has been unable to estimate the probability or
the effect of an adverse outcome of this class action on ZIM’s business, if any. Therefore, ZIM has not recorded a provision in relation to the class action.

European Commission Antitrust Investigation

On November 22, 2013, the European Commission published an announcement in respect of the commencement of investigation procedures against several liner shipping companies due to a

suspicion of them acting in concert. According to the announcement, the European Commission intends to investigate whether public notices of the shipping companies in respect of the future price
increase, which were published on the carriers’ internet websites, in the press and elsewhere, caused or may have caused any restriction on competition and customers’ trading in the liner shipping
market to and from the European Union and the European Economic Area.

158

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
On November 21, 2013, an official notice was submitted to ZIM, in which it was clarified that the investigation proceedings involve a substantial number of liner shipping companies operating
from and to the European Economic Area, including ZIM and that the initiation of proceedings does not imply that the European Commission has made a definitive finding of an infringement, but only
that it intends to give priority to the matter.

All of the carriers involved in the proceedings, including ZIM, agreed to undertake certain actions to address the European Commission’s competition concerns. On July 7, 2016, the European

Commission adopted a decision which rendered these undertakings to be binding upon the carriers involved in the proceedings for a three year period beginning on December 7, 2016. ZIM has
accordingly taken all steps to satisfy these undertakings.

ZIM’s Regulatory, Environmental and Compliance Matters

Government and international regulation significantly affects the ownership and operation of vessels. ZIM is subject to many legal provisions relating to the protection of the environment,

including with respect to the emissions of hazardous substances, SOx and NOx gas exhaust emissions, the operation of vessels while at anchor by means of generators, and the use of low-sulfur fuel.
ZIM could be exposed to high costs in respect of environmental damages (to the extent that the costs are not covered by its insurance policies), criminal charges, and substantive harm to its operations
and goodwill, if and to the extent that environmental damages are caused by its operations. ZIM instructs the crews of its vessels on the environmental regulatory requirements and operates in accordance
with procedures that ensure its in compliance with such regulatory requirements. ZIM also insures its activities, where effective for it to do so, in order to hedge its environmental risks. ZIM’s vessels are
also subject to the standards imposed by the IMO, the United Nations specialized agency with responsibility for the safety and security of shipping and the prevention of marine pollution by ships.

In addition, as of January 1, 2016, sulfur emissions standards for the areas within 200 nautical miles from the United States, Caribbean Sea and Canada were strengthened, and these stricter
standards have posed challenges to ZIM’s ships which operate in these areas. For instance, in response to these stricter regulations, ZIM has had to operate on marine gas oil instead of heavy fuel oil,
which has increased operational costs. Furthermore, the Chinese Ministry of Transportation has recently enacted stricter sulfur emissions standards which may increase ZIM’s operational costs.

ZIM is also subject to extensive regulation that changes from time to time and that applies in the jurisdictions in which shipping companies are incorporated, the jurisdictions in which vessels

are registered (flag states), the jurisdictions governing the ports at which the vessels anchor, as well as regulations by virtue of international treaties and membership in international associations.
Changes and/or amendments to the regulatory provisions applying to ZIM (e.g., the U.S.’s recent policy requiring the scanning of all cargo en route to the United States) could have a significant adverse
effect on ZIM’s results of operations. Additionally, the non-compliance of a port with any of the regulations applicable to it may also adversely impact ZIM’s results of operations, by increasing ZIM’s
operating expenses.

Additionally, ZIM is subject to competition regulations worldwide. For example, in the European Union, ZIM is subject to articles 101 and 102 of the Consolidated Version of the Treaty on the

Functioning of the European Union. ZIM’s transport activities serving the U.S. ports are subject to the Shipping Act of 1984, as modified by the Ocean Shipping Reform Act of 1998. With respect to
Israel, ZIM is subject to the general competition law established in the Israel Antitrust Law, 1988. Immunity from antitrust laws to certain agreements between ocean carriers that operate in the
aforementioned jurisdictions, such as slot exchange agreements and other operational partnerships, are in effect. ZIM is party to certain operational and commercial partnerships with other carriers in the
industry and each of those arrangements, as well as any future arrangements it becomes party to, must comply with the applicable antitrust regulations in order to remain protected and enforceable.

ZIM is also subject to Israeli regulation regarding, among other things, national security and the mandatory provision of ZIM’s fleet, environmental and sea pollution, and the Israeli Shipping

Law (Seamen) of 1973, which regulates matters concerning seamen, and the terms of their eligibility and work procedures.

Finally, ZIM is subject, in the framework of its international activities, to laws, directives, decisions and orders in various countries around the world that prohibit or restrict trade with certain

countries, individuals and entities.

For further information on ZIM’s regulatory risks, see “ Item 3.D Risk Factors—Risks Related to Our Other Businesses—Risks Related to Our Interest in ZIM—ZIM is subject to environmental

regulation and failure to comply with such regulation could have a material adverse effect on ZIM’s business ” and “ Item 3.D Risk Factors—Risks Related to Our Other Businesses—Risks Related to
Our Interest in ZIM—The shipping industry is subject to extensive government regulation and standards, international treaties and trade prohibitions and sanctions. ”

159

 
 
 
 
 
 
 
 
 
 
 
ZIM’s Special State Share

In connection with the 2004 sale of the holdings of the State of Israel in ZIM to IC, ZIM ceased to be a “mixed company” (as defined in the Government Companies Law of Israel) and issued a

Special State Share to the State of Israel. The objectives underlying the Special State Share are to (i) safeguard ZIM’s existence as an Israeli company, (ii) ensure ZIM’s operating ability and transport
capacity, so as to enable the State of Israel to effectively access a minimal fleet in an emergency crisis, or for security purposes and (iii) prevent elements hostile to the State of Israel or elements liable to
harm the State of Israel’s vital interests or its foreign or security interest or Israel’s shipping relations with foreign countries from having influence on ZIM’s management. In connection with the
completion of ZIM’s restructuring plan, certain transferability restrictions imposed by the terms of the Special State Share were revised. Prior to the consummation of ZIM’s restructuring plan, the Israeli
Supreme Court validated ZIM’s articles of association, including the revised terms of the Special State Share. The key terms and conditions of the revised Special State Share include the following
requirements:

·

·

·

·

·

ZIM must be, at all times, a company incorporated and registered in Israel, whose headquarters and registered main office are domiciled in Israel;

at least a majority of the members of ZIM’s board of directors, including the Chairman of the board, as well as the Chief Executive Officer or the person serving as its Chief Business
Officer, whatever his/her title may be, must be Israeli citizens;

any transfer of vessels shall be invalid vis-à-vis ZIM, its shareholders and any third party if, as a result thereof, the minimum fleet target mandated by the State of Israel will not be
maintained and the holder of the Special State Share has not given prior written consent thereto;

any holding and/or transfer of shares and/or allocation that confers possession of shares in ZIM at 35% or more of its issued share capital, or that vests the holder thereof with control over
ZIM, including as a result of a voting agreement, shall be invalid vis-à-vis ZIM, its shareholders and any third party, if the holder of the Special State Share has not given prior written
consent thereto; and

any transfer of shares granting the owner a holding exceeding 24% but not exceeding 35%, shall require prior notice to the State of Israel, including full information regarding the transferor
and the transferee, the percentage of the shares held by the transferee after the transaction will be completed, and the relevant information about the transaction, including voting agreements
and agreements for the appointment of directors (if applicable). In any case, if the State of Israel determines that a transfer of such shares shall constitute potential harm to the State of
Israel’s security, or any of its vital interests, or that it has not received the relevant information in order to make a decision, the State of Israel shall be entitled to notify the parties within 30
days that it opposes the transaction, and will be obligated to justify its opposition. In such a situation, the requestor of the transaction shall be entitled to transfer this matter to the competent
court, which shall hear and rule on the subject in question.

Any change, including an amendment or cancellation of the rights afforded to the State of Israel by the Special State Share shall be invalid with respect to ZIM, its shareholders and any third

party, unless it is approved in advance and in writing by the State of Israel.

Kenon’s ownership of ZIM shares is subject to the terms and conditions of the Special State Share, which restricts Kenon’s ability to transfer its equity interest in ZIM to third parties. The terms

of the State of Israel’s consent of Kenon’s and Idan Ofer’s status, individually and collectively, as a “Permitted Holder” of ZIM’s shares, stipulates, among other things, that Kenon’s transfer of the
means of control of ZIM is limited if the recipient is required to obtain the State of Israel’s consent, or is required to notify the State of Israel of its holding of ZIM shares pursuant to the terms of the
Special State Share, unless such consent was obtained by the recipient or the State of Israel did not object to the notice provided by the recipient. In addition, the terms of the consent provide that, if Idan
Ofer’s ownership interest in Kenon is less than 36% or Idan Ofer ceases to be the controlling shareholder, or sole controlling shareholder of Kenon, then Kenon’s rights with respect to its shares in ZIM
will be limited to the rights applicable to an ownership of 24% of ZIM, until or unless the State of Israel provides its consent, or does not object to, this decrease in Idan Ofer’s ownership or control.
Therefore, if Mr. Ofer sells a portion of his interest in Kenon and owns less than 36% of Kenon, or ceases to be Kenon’s controlling shareholder, then Kenon’s right to vote and receive dividends in
respect of its ZIM shares, for example, will be limited to those available to a holder of 24% of ZIM’s shares (even if Kenon holds a greater percentage of ZIM’s shares). “Control”, for the purposes of
this consent, is as defined in the State of Israel’s consent, with respect to certain provisions. Additionally, the State of Israel may revoke Kenon’s permit if there is a material change in the facts upon
which the State of Israel’s consent was based, or upon a breach of the provisions of the Special State Share by Kenon, Mr. Ofer, or ZIM. For information on the risks related to the State of Israel’s
ownership of the Special State Share, including with respect to IC’s transfer of its interest in ZIM to us, see “ Item 3.D Risk Factors —Risks Related to Our Other Businesses—Risks Related to Our
Interest in ZIM—Israel holds a Special State Share in ZIM, which imposes certain restrictions on ZIM’s operations and our equity interest in ZIM. ”

160

 
 
 
 
 
 
 
 
 
Tower

Tower is a pure-play independent specialty foundry dedicated to the manufacture of semiconductors. On July 23, 2015, consistent with our strategy to realize value for our shareholders by,
among other things, distributing our interests in our non-primary businesses to our shareholders rationally and expeditiously, we completed the pro rata distribution in specie of 18,030,041 ordinary
shares of Tower, representing 23% of the then currently outstanding Tower shares and substantially all of our interest in Tower, to holders of our ordinary shares. As a result of this distribution, we
recognized a $210 million gain in the year ended December 21, 2015, which reflects the difference between the fair market value of the Tower ordinary shares held by us on the distribution date ($255
million based upon the closing price of the Tower shares on NASDAQ on the date of our distribution of such shares to our shareholders) and the carrying amount of Tower’s shares at the time of the
distribution ($45 million). In 2016, we sold our remaining interest in Tower.

Tower’s results of operations are reflected in our share in income (losses) of associated companies, net of tax, for all periods prior to June 30, 2015. For further information on Tower and its

operations, see “ Information Regarding Tower. ”

Remaining Businesses

We have a 91% equity interest in Primus , an innovative developer and owner of a proprietary natural gas-to-liquid technology process.

Additionally, until December 24, 2014, we owned a 69% equity interest in Petrotec , a European producer of biodiesel generated from used cooking oil, or UCO, whose securities are listed on

the Frankfurt Stock Exchange. On December 24, 2014, REG, a NASDAQ-listed advanced biofuels producer and developer of renewable chemicals, purchased Kenon’s holdings in Petrotec. As
consideration for REG’s purchase of Petrotec’s shares, Kenon received approximately $20.9 million, which was paid in the form of newly-issued shares of Renewable Energy Group, Inc., or REG.
Kenon has sold its interest in REG.

Primus

Primus’ Description of Operations

Primus is an innovative developer of a proprietary liquids technology, the STG+ process, which is designed to produce liquid hydrocarbons from synthesis gas, or syngas, derived from natural
gas (including synthetic natural gas) and other feedstocks (e.g., ethane). Primus’ STG+ process converts syngas into methanol and high-octane gasoline. The availability of large shale gas reserves in the
U.S. and the low cost of natural gas in relation to the cost of gasoline enables Primus to primarily utilize domestically produced natural gas in its STG+ process.

Primus’ business strategy is focused on three primary activities:

· Methanol Production . Primus intends to own, operate and develop, or license the technology for the operation and development of, methanol production plants to service local users of

methanol who are located far from larger-scale methanol plants.

· Gasoline Production . Primus intends to provide its STG+ process to convert natural gas into high octane gasoline for industrial and chemical plant owners who have spare syngas

capacity.

· Gas Flaring Solutions . Primus offers gas flaring solutions to convert natural gas that would otherwise be flared into gasoline. Primus intends to provide technology licenses and collect

gasoline production royalties from operators seeking to remain in compliance with strict anti-flaring regulations and monetize natural gas that would otherwise be flared.

Primus seeks to operate as a technology development company and may take equity interests in the plants which it develops. Primus seeks to generate revenues from construction management
and engineering fees, technology licensing fees and production royalties, and, from plants in which Primus will have an equity interest, operating revenue from the sale of methanol and gasoline. When
Primus develops a plant for a customer, Primus intends to pass through the costs of developing the plant to the customer.

Primus’ STG+ process improves upon existing gas-to-liquid technologies by integrating all reactors into a single-loop process, thereby reducing capital and operating costs while increasing

reliability and yield. Primus expects the STG+ process to operate on a smaller scale than the competing methanol-to-gasoline process utilized by other, non-traditional gasoline producers. Primus expects
its customers to be able to distribute, store and pump its gasoline using existing fuel infrastructures and expects that the gasoline produced may be utilized in unmodified, conventional vehicles.

161

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Between 2011 and 2013, Primus operated a pilot scale test facility at its headquarters in Hillsborough, New Jersey. Primus’ pilot plant consisted of two major units, the first being a wood pellet

gasifier that produced syngas, and the second being the STG+ process. The STG+ process has been successfully validated at the pilot scale. Primus used the data obtained from such operations to
optimize the design of its demonstration plant, which was completed in August 2013. Primus’ demonstration plant generates syngas from natural gas, and converts the syngas into methanol and high-
octane gasoline. The demonstration plant has a nameplate production capacity for gasoline of 12.7 gallons per hour, or 100,000 gallons per year, and for methanol of 32.4 gallons per hour or 255,000
gallons per year, and was designed to replicate the key scale parameters of a larger plant, so as to minimize potential scale-up risks. Between 2013 and 2016, Primus successfully operated the
demonstration plant for over 8,700 hours.

In the year ended December 31, 2016, Primus did not generate material revenues from its operations. As of December 31, 2016, we have invested approximately $88 million (which includes

amounts invested by IC prior to the spin-off) into Primus.

In connection with Primus’ further development and our efforts to maximize its value, we may provide additional capital to Primus, in the form of debt or equity financing, if deemed
appropriate to facilitate Primus’ operational and development capital requirements. Through our wholly-owned subsidiary IC Green, we have provided Primus a total of $26 million (including accrued
interest) via a series of convertible notes through December 31, 2016. In 2017, we provided Primus an additional $3.3 million via convertible notes.

We own 91% of Primus and the remaining 9% is primarily held by Primus’ founders; on a fully diluted basis, giving effect to management share options, Kenon’s ownership interest in Primus

is approximately 80%.

Primus’ Principal Markets; Customers

Primus intends to own, operate and develop, or license the technology for the operation and development of, methanol production plants in North America. The intended off-takers of Primus’
methanol are expected to primarily consist of local users of methanol who are located far from large-scale methanol production plants. In the United States, methanol is generally produced in the Gulf
Coast and is transported to off-takers throughout the country. Due to transportation costs, methanol customers located outside the Gulf Coast region pay a substantially higher price than customers
around the Gulf Coast. Primus intends to construct and own plants in such regions to capture the price spread resulting from the transportation costs and lower costs of natural gas.

The main intended customers and commercial partners for Primus’ gasoline production services are underutilized chemical and industrial plants. Specifically, Primus aims to partner with
industrial and chemical plant owners who have spare syngas generation capacity to produce gasoline. Primus also intends to provide gasoline production services to customers and partners in regions that
have limited gasoline refining abilities and infrastructure.

Finally, Primus intends to provide its gas flaring solutions to customers throughout the world, particularly those in regions with strict gas flaring regulations. The production of oil results in the
“flaring” of natural gas—a method disposing of, rather than utilizing, any excess natural gas. Such flaring has become a concern in certain countries as a result of the associated emissions in greenhouse
gases and the subsequent decrease in the availability of natural gas. As Primus’ STG+ process converts syngas into high-octane gasoline, Primus can provide its potential customers with the
technological tools to transform the natural gas associated with oil production and flaring into gasoline.

Potential customers of the gasoline and methanol produced by Primus’ technology include existing refiners of crude oil, industrial and chemical users, purchasers of oil-based fuels, and

blenders of transportation fuels and direct end-users, such as retailers.

Decreases in the costs associated with traditional sources of fuel or electricity, such as prices for commodities like crude oil, coal, fuel oil and natural gas, have, and could further, reduce the

demand for the solutions provided by Primus. For further information on the risks related to the demand of Primus’ products and services in light of the fluctuating costs of traditional sources of fuel, see
“ Item 3.D Risk Factors—Risks Related to Our Other Businesses—Risks Related to Our Other Businesses—The decrease in the cost of fuel or electricity generated by traditional sources may cause the
demand for the services provided by Primus to decline .”

Primus’ Project Pipeline

Primus is engaging in discussions with potential customers and joint venture partners with respect to potential projects, including for the construction of methanol plants in North America, the

conversion of syngas into gasoline and the provision of gas flaring solutions. Should Primus secure these potential projects, which may be located throughout the world, Primus may be compensated
through a mix of revenues from sales to off-takers, construction management and engineering fees, technology licensing fees and production royalties. A number of these projects also give Primus the
opportunity to own equity in the project. At this time, these projects have not been secured.

162

 
 
 
 
 
 
 
 
 
 
 
 
Primus’ Raw Materials and Suppliers

In connection with the operation of Primus’ demonstration plant in the year ended December 31, 2016, a single supplier provided Primus with its natural gas requirements, representing an

immaterial amount of Primus’ operating expenses in the year ended December 31, 2016.

Primus’ Competition

Primus seeks to operate as a producer of alternative liquids. Its competitors are expected to include other gas-to-liquids companies and companies using other feedstocks to produce syngas, such

as ExxonMobil MTG, Haldor Topsøe TIGAS or other newly-established ventures that provide a different technological approach to the production of syngas. Primus also competes with traditional
producers of gasoline and methanol. As Primus’ STG+ process is further developed to produce gasoline and methanol, Primus also expects to compete with the traditional and alternative producers of
these fuels. Primus believes that its (i) direct synthesis of the desired product, (ii) high yield and cost-effective results, and (iii) selective process allows it to remain competitive with its competitors in
both areas.

Primus’ Patents, Licenses, Etc.

Primus’ intellectual property portfolio includes: two issued U.S. patents on its core technology, the “Single Loop Process”, to produce liquid fuels from syngas; two issued U.S. patents on its
first commercial product, specifically the “Fuel Composition”; and several additional patent applications and trade secrets that are generally categorized into the following areas: liquid fuel synthesis,
liquid fuel composition, incremental improvements and customization, and biomass gasification.

Primus has also filed corresponding patent applications under the Patent Cooperation Treaty and has filed national phase applications in multiple countries for its base process patent. Primus

actively evaluates its intellectual property portfolio so as to optimize its intellectual property strategy and to protect the authenticity and commercial value of its STG+ process.

Primus’ Property, Plants and Equipment

Primus’ fully operational 300 gallon-per-day integrated industrial demonstration plant located in Hillsborough, New Jersey, was successfully constructed in August 2013. The demonstration
plant converts natural gas feedstock into syngas which is, in turn, converted into high-octane gasoline and methanol. The demonstration plant has a nameplate production capacity for gasoline of 12.7
gallons per hour, or 100,000 gallons per year, and for methanol of 32.4 gallons per hour or 255,000 gallons per year. Primus expects this demonstration plant to provide the performance data necessary
for the design and development of other plants.

Primus’ Regulatory, Environmental and Compliance Matters

Primus’ operations are affected by various local and foreign laws, rules, regulations and authorities. As a result, changes in various types of regulations could affect Primus’ business adversely.

For example, the implementation of new safety, environmental or legal requirements could impact Primus’ ability to produce gasoline and methanol, or use the STG+ process. Furthermore, changes to
the various regulations governing gas flaring could impact Primus’ ability to provide gas flaring solutions. The impact of these changes in regulation could adversely affect Primus’ business, financial
condition and results of operations even where the specific regulations do not directly apply to Primus or to its technologies, products or services.

Petrotec

Petrotec, in which we held a 69% interest until December 2014, is a European producer of biodiesel generated from UCO and other waste. On December 24, 2014, REG, a NASDAQ-listed

advanced biofuels producer and developer of renewable chemicals, purchased Kenon’s holdings in Petrotec. As consideration, Kenon received approximately $20.9 million, which was paid in the form
of newly-issued shares of REG. Kenon has sold its interest in REG.

C.   

 Organizational Structure

The chart below represents a summary of our organizational structure, excluding intermediate holding companies. This chart should be read in conjunction with the explanation of our

ownership and organizational structure above.

163

 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
 
 
D.   

 P roperty, Plants and Equipment

For information on our property, plants and equipment, see “ Item 4.B Business Overview . ”

ITEM 4A. Unresolved Staff Comments

Not Applicable.

ITEM 5. Operating and Financial Review and Prospects

This section should be read in conjunction with our audited combined carve-out (for the year ended December 31, 2014) and consolidated (for the years ended December 31, 2016 and 2015)

financial statements, and the related notes thereto, as of December 31, 2016 and 2015, and for the years ended December 31, 2016, 2015 and 2014, included elsewhere in this annual report. Our
financial statements have been prepared in accordance with IFRS as issued by the IASB. The financial information below also includes certain non-IFRS measures used by us to evaluate our economic
and financial performance. These measures are not identified as accounting measures under IFRS and therefore should not be considered as an alternative measure to evaluate our performance. In
addition, all financial information below relating to Tower has been derived from financial statements that were prepared in accordance with U.S. GAAP.

The discussion and analysis relating to our results of operations for periods as of and prior to December 31, 2014 have been prepared assuming that Kenon operated as a separate entity prior
to the consummation of the spin-off on January 7, 2015. Therefore, references in this discussion to the historical results of our businesses refer to businesses that had not been, but were expected to be,
contributed to us in connection with the spin-off. The historical financial statements for the periods under review have been carved out of the consolidated financial statements of IC, which held each of
our businesses during the periods under review. References in this discussion to our historical results of operations prior to the spin-off therefore refer to the carved-out historical results of IC’s
operations. The financial position, results of operations and cash flows reflected in our combined carve-out financial statements for all periods as of and prior to December 31, 2014 include all expenses
attributable to our business and each of our businesses, but may not be indicative of those that would have been achieved had we operated as a separate public entity for all periods presented, or of our
future results.

Certain information included in this discussion and analysis includes forward-looking statements that are subject to risks and uncertainties, and which may cause actual results to differ

materially from those expressed or implied by such forward-looking statements. For further information on important factors that could cause our actual results to differ materially from the results
described in the forward-looking statements contained in this discussion and analysis, see “Special Note Regarding Forward-Looking Statements” and “Item 3.D Risk Factors.”

Business Overview

We are a holding company that operates dynamic, primarily growth-oriented, businesses. The companies we own, in whole or in part, are at various stages of development, ranging from

established, cash generating businesses to early stage companies.

We were established in connection with a spin-off of our businesses from IC to promote the growth and development of our primary businesses, and we are primarily engaged in the operation

of the following businesses: (i) IC Power, a power generation and distribution company that has experienced growth in its revenues and generation capacity since its inception in 2007, in which we have
a 100% equity interest, and (ii) Qoros, a China-based automotive company in which we have a 50% equity interest, that is seeking to deliver international standards of quality, safety, and innovative
features to the large and fast-growing Chinese automotive market and commenced commercial sales at the end of 2013.

164

  
  
 
 
 
 
 
 
 
 
 
 
 
In the case of IC Power, we intend to continue to invest in projects that IC Power expects to generate attractive, risk-adjusted returns, using operating cash flows, project or other financing at the
IC Power level, as well as proceeds resulting from opportunistic dispositions by IC Power of assets, including mature assets. In January 2017, IC Power commenced a roadshow for an IPO of IC Power's
ordinary shares; however, in light of market conditions, IC Power withdrew its IPO, as the IPO was not deemed to be in the best interests of IC Power and Kenon at such time. We are evaluating various
strategic alternatives with respect to our interest in IC Power and its businesses, which may include a future offering, listing, distribution or monetization of IC Power or its subsidiaries.

In the case of Qoros, we have used a significant portion of our liquidity and capital resources that we received in connection with our spin-off from IC to support Qoros through shareholder
loans and guarantees in respect of Qoros’ debt, and we have no obligation to provide further funding to Qoros. In light of our strategy to refrain from material "cross-allocation" (i.e. investing returns
from one business into another), Kenon has been seeking other sources of financing for Qoros, as well as opportunities for Kenon to provide financing to Qoros in connection with a reduction of Kenon's
back-to-back guarantee exposure to Qoros (i.e., investments in Qoros that do not increase Kenon's exposure to Qoros). In line with this strategy, in December 2016 and March 2017, Kenon entered into
agreements with Chery to provide financing to Qoros of up to RMB1,027 million in connection with a full release of Kenon's back-to-back guarantee obligations to Chery (which obligations were
RMB1,100 million, plus certain interest and fees, prior to such investments). Pursuant to these agreements, Kenon has funded shareholder loans of RMB638.5 million in connection with a RMB675
million reduction in its guarantee obligations to Chery, and may fund additional shareholder loans of RMB388.5 million to Qoros in connection with the full release of such back-to-back guarantee
obligations.

Qoros will require additional financing, including the renewal or refinancing of its working capital facilities, to continue to operate and meet its operating expenses and debt service
requirements. If Qoros is not able to raise additional financing as required, it may be unable to continue operations. In April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin,
pursuant to which Yibin may invest in Qoros in connection with the establishment of an NEV and conventional vehicle manufacturing base. Yibin may make significant investments in Qoros upon
government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other agreements. Such further investment, if provided, is expected to dilute
Quantum's and Chery's interests in Qoros. In addition, Yibin may obtain significant control rights with respect to Qoros. For further information, see “ —Recent Developments—Qoros—Agreement with
Yibin to Jointly Establish NEV Manufacturing Base .”

We will continue to assess opportunities to support Qoros and its liquidity position and fundraising efforts.   In addition, we will consider potential opportunities with respect to our interest in

Qoros, including by potentially providing direct access to Qoros when we believe it is in the best interests of Qoros' development and our shareholders to do so.

We also hold interests in:

·

·

ZIM —A large provider of global container shipping services, which, as of December 31, 2016 operated 72 (owned and chartered) vessels with a total container capacity of 322,566 TEUs,
and in which we have a 32% equity interest; and

Primus , an innovative developer and owner of a proprietary natural gas-to-liquid technology process, in which we have a 91% equity interest.

Overview of Financial Information Presented

As a holding company, Kenon’s results of operations are impacted by the financial results of each of its businesses. To effectively assess our results of operations, we supply detailed
information on the financial results of our individual businesses and the impact such results have had on our consolidated results of operations. The analysis of each business’ impact on our results of
operations for the years ended December 31, 2015 and 2016 depends upon the method of accounting applicable to it as set forth in the following table:

IC Power 1   
Qoros  
ZIM  
Other   

Primus 

___________________

Years Ended December 31, 2015 and 2016

Ownership Percentage

Method of Accounting

Treatment in Consolidated
Financial Statements

100%  Consolidated 2
50%  Equity
32%  Equity

  Consolidated
  Share in losses of associated companies, net of tax
  Share in losses of associated companies, net of tax

91%  Consolidated

  Consolidated

1. Kenon's segments for the periods after December 31, 2015 include IC Power (Generation) and IC Power (Distribution), as a result of Kenon’s acquisition of its distribution business in January 2016.
2.

IC Power’s consolidated results of operations include income/loss from associated companies relating to IC Power’s non-controlling interests in Pedregal, which IC Power accounts for pursuant to
the equity method of accounting.

165

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
table:

IC Power  
Qoros  

ZIM 2   

Tower  

Other   

Primus   
Petrotec  

The analysis of each business’ impact on our results of operations for the year ended December 31, 2014 depends upon the method of accounting applicable to it, as set forth in the following

Six Months Ended December 31, 2014

All Periods Prior to June 30, 2014

Ownership
Percentage

  Method of Accounting  

Treatment in Combined Carve-
Out Financial Statements

Ownership
Percentage

  Method of Accounting  

Treatment in Combined Carve-
Out Financial Statements

100%  Consolidated 1
50%  Equity

32%  Equity

  Consolidated
  Share in losses of associated

companies, net of tax

  Share in losses of associated

companies, net of tax 3

100%  Consolidated 1
50%  Equity

  Consolidated
  Share in losses of associated

companies, net of tax

99.7% 2  Consolidated—

  Income (loss) for the year from

Discontinued
Operations

discontinued operations (after taxes)

29%  Equity

  Share in income of associated

29%  Equity

companies, net of tax

  Share in losses of associated

companies, net of tax 4

91%  Consolidated
— 3  Equity— Discontinued

Operations

  Consolidated
  Income (loss) for the year from
discontinued operations (after
taxes)

HelioFocus

70%  Consolidated

  Consolidated

_______________________

91%  Consolidated
69%  Consolidated—

  Consolidated
  Income (loss) for the year from

Discontinued
Operations

70% 4  Equity

discontinued operations (after taxes)

  Share in losses of associated

companies, net of tax

1.

IC Power’s consolidated results of operations for the year ended December 31, 2014, as reported by Kenon, included income/loss from IC Power’s associated companies (Generandes and Pedregal),
which were accounted for pursuant to the equity method of accounting.

2. On July 16, 2014, ZIM completed the restructuring of its outstanding indebtedness, which resulted in IC, and consequently, Kenon, owning 32% of the restructured ZIM as compared to IC’s

previous interest in ZIM of approximately 99.7%. As a result of the restructuring, ZIM’s results of operations for all periods prior to June 30, 2014 are reflected as discontinued in Kenon’s results of
operations. ZIM’s results of operations for all periods subsequent to June 30, 2014 are reflected in Kenon’s share in losses of associated companies, net of tax.

3. For further information on Kenon’s December 2014 sale of its equity interest in Petrotec, see “ Item 4.B Business Overview—Our Businesses—Remaining Businesses—Petrotec .”
4. Notwithstanding our majority equity interest in HelioFocus, as a result of veto rights held by HelioFocus’ other major shareholder until May 31, 2014, we did not consolidate HelioFocus’ results

with our own until June 30, 2014.

The results of the following companies are included in Kenon’s statements of profit and loss as share in losses of associated companies, net of tax, for the years set forth below, except as
otherwise indicated: (i) Qoros, (ii) ZIM from June 30, 2014, (iii) Tower until June 30, 2015, (iv) HelioFocus until June 30, 2014 (subsequently, HelioFocus’ results have been consolidated with Kenon’s)
and (v) certain non-controlling interests held by IC Power.

The following tables set forth selected financial data for Kenon’s reportable segments for the periods presented:

IC Power
Generation

IC Power
Distribution

Year Ended December 31, 2016

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

  $

  $

  $

  $

  $

Sales 
Depreciation and amortization 
Impairment of assets and investments 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Provision of financial guarantee 
Income (loss) before taxes 
Income taxes 
Income (loss) from continuing operations 

Attributable to:

Kenon’s shareholders 
Non-controlling interests 

Segment assets 4 
Investments in associated companies 
Segment liabilities 
Capital expenditure 7 

Adjusted EBITDA 
Percentage of consolidated revenues 
Percentage of consolidated assets 
Percentage of consolidated assets excluding

associated companies

Percentage of consolidated Adjusted EBITDA
__________________________

1. Associated company.

  $

1,365 
(157)  
— 
10 
(166)  
1 
— 
31 
(45)  
(14)   $

  $

  $

509 
(15)  
— 
4 
(19)  
— 
— 
47 
(12)  
35 

  $

  $

  $

(29)  
15 
4,217 
8 
3,462 
262 
3438    $
73% 
82% 

86% 
87% 

  $

32 
3 
600 
— 
542 
28 
779    $
27% 
12% 

12% 
19% 

166

  $

— 
— 
— 
— 
— 
(143)  
— 

(143)   $

— 

(143)   $

  $

(143)  
— 
— 
118 
— 
— 

  $

— 
—% 
2% 

—% 
—% 

— 
— 
(72)
17 
(17)
(44)
(130)
(270)
(2)
(272)

  $

  $

  $

  $

(272)
— 
1135  
82 
2406  
— 
(24) 10  $
—%  
4%  

2%  
(6)%  

  $

— 
— 
— 
(12)  
12 
— 
— 
— 
— 
— 

  $

  $

  $

— 
— 
— 
— 
— 
— 

  $

— 
—% 
—% 

—% 
—% 

1,874 
(172)
(72)
19 
(190)
(186)
(130)
(335)
(59)
(394)

(412)
18 
4,930 
208 
4,244 
290 

396 
100%
100%

100%
100%

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Includes the results of Primus and HelioFocus; the results of ZIM, as an associated company; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment financing income and expenses.

2.
3.
4. Excludes investments in associates.
5.
6.
7.
8. For a reconciliation of IC Power Generation’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2016, see “ Item 3.A Selected

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

Financial Data .”

9. For a reconciliation of IC Power Distribution’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2016, see “ Item 3.A Selected

Financial Data .”

10. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

Year Ended December 31, 2015

IC Power

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

Sales 
Depreciation and amortization
Asset impairment
Financing income
Financing expenses
Share in (losses) income of associated companies
Gain from distribution of dividend in kind
Income (loss) before taxes
Income taxes 
Income (loss) from continuing operations

Attributable to:

Kenon’s shareholders
Non-controlling interests

Segment assets 5 
Investments in associated companies
Segment liabilities
Capital expenditure 8

Adjusted EBITDA
Percentage of consolidated revenues
Percentage of consolidated assets
Percentage of consolidated assets excluding associated companies
Percentage of consolidated Adjusted EBITDA
________________________

  $

  $

  $

  $

  $

  $

  $

  $

  $

1,294 
(119)
— 
10 
(115)
— 
— 
149 
(62)
874  

63 
24 
4,069 
9 
3,063 
533 

3724,9    $
100%  
91%  
99%  
100%  

  $

— 
— 
— 
— 
— 
(196)  
— 

(196)   $

— 

(196)   $

  $

(196)  
— 
— 
159 
— 
— 

  $

— 
— 
4% 
— 
— 

— 
(1)
(7)
3 
(9)
9 
210 
205 
— 
205 

  $

  $

  $

206 
(1)
456     $
201 
1567    
— 

110    $
— 
5%  
1%  
— 

(5)   $
— 
— 
— 
— 
— 
— 
— 
— 
— 

  $

  $

  $

  $

— 
— 
— 
— 
— 
— 

— 
— 
— 
— 
— 

1,289 
(120)
(7)
13 
(124)
(187)
210 
158 
(62)
96 

73 
23 
4,114 
369 
3,219 
533 

373 
100%
100%
100%
100%

1. Associated company.
2.

3.
4.

Includes the results of Primus and HelioFocus; the results of ZIM and Tower (up to June 30, 2015), as associated companies; as well as Kenon’s and IC Green’s holding company and general and
administrative expenses.
“Adjustments” includes inter-segment sales.
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

5. Excludes investments in associates.
6.
7.
8.
9. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, see “ Item 3.A Selected Financial Data

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

.”

10. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

167

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Sales 
Depreciation and amortization 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Asset impairment 
Gain from disposal of investee 
Gain from bargain purchase 

Income (loss) before taxes 
Income taxes 

Income (loss) from continuing operations 

Attributable to:
Kenon’s shareholders 
Non-controlling interests 
Segment assets 6 
Investments in associated companies 
Segment liabilities 
Capital expenditure 9 
Adjusted EBITDA 
Percentage of combined revenues 
Percentage of combined assets 
Percentage of combined assets excluding associated companies
Percentage of combined Adjusted EBITDA 
_________________________

  $

  $

  $

  $

  $

Year Ended December 31, 2014 1

Qoros 2

Other 3
(in millions of USD, unless otherwise indicated)

Adjustments 4

Combined Carve-
Out Results

IC Power

  $

1,358 
(108)
9 
(132)
14 
(35)
157 
68 

  $

321 
(99)

  $

— 
— 
— 
— 
(175)  
— 
— 
— 

(175)   $
— 

  $

  $

— 
— 
39 
(10)
(10)
(13)
— 
— 

(37)
(4)

  $

  $

14 
— 
(32)
32 
— 
— 
— 
— 

— 
— 

2225  

  $

(175)   $

(41)

  $

— 

  $

  $

197 
25 
3,832 
10 
2,860 
593 
3485,10    $
99%  
89%  
99%  
114%  

  $

  $

(175)  
— 
— 
221 
— 
— 
— 
— 
— 
— 
— 

  $

(34)
(7)
8377  
205 
8068  
12 
(43) 11  $
— 
23%  
21%  
(14)%  

— 
— 
(785)
— 
(785)
— 
— 

  $

  $

1%  
(12)% 
(20)% 
— 

1,372 
(108)
16 
(110)
(171)
(48)
157 
68 

109 
(103)

6 

(12)
18 
3,884 
436 
2,881 
605 
305 
100%
100%
100%
100%

1. During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in IC Power.

Kenon’s and IC Power’s financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.

2. Associated company.
3.

4.

5.

Includes financing income from former parent company loans to Kenon’s subsidiaries; the results of Primus, HelioFocus (from June 30, 2014) and ZIM (up to June 30, 2014); the results of ZIM
(from June 30, 2014), Tower and HelioFocus (up to June 30, 2014), as associated companies; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment sales, and the consolidation entries. For the purposes of calculating the “percentage of combined assets” and the “percentage of combined assets excluding
associated companies,” “Adjustments” has been combined with “Other.”
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

6. Excludes investments in associates.
7.
8.
9.
10. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, see “ Item 3.A Selected Financial Data

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

.”

11. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

The following tables set forth summary information regarding each of our equity-method accounting businesses for the periods presented.

Income (loss) (100% of results)  
Share of Income (loss) from Associates   
Book Value   

Qoros

ZIM

Other

Total

Year Ended December 31, 2016

(285)   $
(143)  
118 

(in millions of USD)

(168)   $
(44)  
82 

  $

— 
1 
8 

(437)
(186)
208 

  $

168

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Income (loss) (100% of results)  
Share of Income (loss) from Associates   
Book Value   
____________________________

Qoros

ZIM

Year Ended December 31, 2015
Tower 1
(in millions of USD)

Other

Total

  $

(392)   $
(196)  
159 

  $

2 
10 
201 

(1)   $
(1)  
— 

  $

— 
— 
9 

(391)
(187)
369 

1. Reflects Tower’s results of operations up to June 30, 2015. As a result of our distribution in specie of substantially all of our interest in Tower, representing 23% of the then currently outstanding

Tower shares on July 23, 2015, Tower’s results of operations for all periods subsequent to June 30, 2015 are not reflected in our consolidated financial statements.

Income (loss) (100% of results)  
Share of Income (loss) from Associates   
Book Value   
Market Capitalization  
Kenon Share of Market Capitalization  
____________________________

Qoros

ZIM 1

  $

(350)   $
(175)  
221 
— 
— 

Year Ended December 31, 2014
Tower
(in millions of USD)
25 
18 
14 
7742   
224 

(73)   $
(13)  
191 
— 
— 

  $
  $

  $

Other

Total

  $

— 
(1)  
10 
— 
— 

(398)
(171)
436 
774 
224 

1. On July 16, 2014, ZIM completed the restructuring of its outstanding indebtedness, which resulted in IC, and consequently, Kenon, owning 32% of the restructured ZIM as compared to IC’s

previous interest in ZIM of approximately 99.7%. As a result of the restructuring, ZIM is only reflected as an associated company in Kenon’s results of operations for the six months ended
December 31, 2014.

2. Market capitalization is based upon 58,033,049 shares outstanding, as of December 31, 2014, at $13.33 per share, the closing price of Tower’s shares on NASDAQ on December 31, 2014.

Qoros

We have a 50% equity interest in Qoros. As a result, we account for Qoros pursuant to the equity method of accounting and discuss Qoros’ results of operations in our discussion of our share in
losses of associated companies, net of tax. Additional detail on Qoros’ historical financial performance can be found in Qoros’ separate financial statements for the years ended December 31, 2016, 2015
and 2014, which are included in this annual report.

ZIM

On July 16, 2014, ZIM completed the restructuring of its outstanding indebtedness, which resulted in IC, and consequently, Kenon, owning 32% of the restructured ZIM as compared to IC’s

previous interest in ZIM of approximately 99.7%. As a result of the restructuring, ZIM’s results of operations for all periods prior to June 30, 2014 are reflected as discontinued in Kenon’s results of
operations and ZIM’s results of operations for the six months ended December 31, 2014 and the years ended December 31, 2015 and 2016 are reflected in Kenon’s share in losses of associated
companies, net of tax.

Set forth below are our results attributable to ZIM for the six months ended June 30, 2014, during which ZIM’s results of operations were reflected in our financial statements as discontinued

operations:

Sales   
Cost of sales   

Gross profit (loss)  

Operating loss   

Loss before taxes on income   
Taxes on income  

Loss after taxes on income   
Income from realization of discontinued operations  

Income for the period from discontinued operations   

Tower

For information on Tower’s results of operations, see “ Information Regarding Tower. ”

169

  Six Months Ended 
June 30, 2014
(in millions of
USD)

  $

1,741 
(1,681)

60 

(18)

(119)
(10)

(129)
609 

480 

  $

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
Material Factors Affecting Results of Operations

IC Power

Set forth below is a discussion of the material factors affecting the results of operations of IC Power for the periods under review.

Capacity Growth

Set forth below is IC Power’s capacity growth:

Entity

Country

Energy used to 
Operate Power Station

COD/ Date of Acquisition

Installed
Capacity
(MW) 1,2

Proportionate
Capacity 3

Capacity at January 1, 2014 
Corinto 
Tipitapa Power 
Amayo I 
Amayo II 
Surpetroil 
Kallpa—Las Flores 
JPPC 

  Nicaragua
  Nicaragua
  Nicaragua
  Nicaragua
  Colombia
Peru
Jamaica

Puerto Quetzal 
Total increase in capacity during 2014 

  Guatemala

  HFO
  HFO
  Wind
  Wind
  Natural gas
  Natural gas
  HFO

  HFO

Capacity at December 31, 2014 
Nejapa 

  El Salvador

  HFO

  Natural gas
  Natural gas

OPC-Hadera 7   
Surpetroil  
Total increase in capacity during 2015 

Israel
  Colombia

Capacity at December 31, 2015   
Kanan  
Samay I  
Surpetroil  
CDA   
Total increase in capacity during 2016  

Panama
Peru
  Colombia
Peru

Capacity at December 31, 2016   

________________________

Acquired—March 2014
Acquired—March 2014
Acquired—March 2014
Acquired—March 2014
Acquired—March 2014
Acquired—April 2014
Acquired Remaining
Interest—May 2014 4
Acquired—September 2014  

Acquired Remaining
Interest—January 2015 6
Acquired—August 2015
COD Plants—2015

2,070 
71 
51 
40 
23 
15 
193 

— 
1795   
572 

2,642 

— 
18 
5 
23 

2,665 
92 
632 
11 
545 
1,280 

3,945 

1,608 
46 
33 
24 
14 
9 
145 

50 
179 
500 

2,108 

41 
18 
3 
62 

2,170 
92 
474 
7 
409 
872 

3,152 

  HFO
  Diesel and natural gas
  Natural gas
  Hydroelectric

COD—April 2016
COD—May 2016
COD Plants—2016
COD—August 2016

1. As a result of IC Power’s sale of its indirect interest in Enel Generación Perú in September 2014, the capacity growth summary does not include Enel Generación Perú’s 1,540 MW of installed

capacity during the periods in which IC Power held its indirect interest in Enel Generación Perú.

2. Reflects 100% of the capacity of each of IC Power’s assets, regardless of the ownership interest in the entity that owns each such asset.
3. Reflects the proportionate capacity of each of IC Power’s assets, as determined by the ownership interest in the entity that owns each such asset.
4.
5.
6.
7. OPC-Hadera also holds a conditional license for the construction of a cogeneration power station in Israel, based upon a plant with 140 MW of capacity. Construction commenced in June 2016 and

In May 2014, IC Power increased its equity ownership in JPPC from 16% to 100%.
In November 2014, Puerto Quetzal transferred a 55 MW power barge to Kanan, reducing Puerto Quetzal’s capacity from 234 MW to 179 MW.
In January 2015, IC Power increased its equity ownership in Nejapa from 71% to 100%.

COD is expected by early 2019.

As a result of its capacity expansion, IC Power’s consolidated revenues, operating income, finance expenses and net income during the periods discussed in this section substantially increased.

Macroeconomic Conditions in the Countries in which IC Power Operates

Macroeconomic conditions may impact the gross domestic production of the countries in which IC Power generates or distributes electricity which may, in turn, affect the consumption of

electricity by industrial and individual consumers in those countries. For instance, countries experiencing sustained economic growth generally experience an increase in their consumption of electricity.
Additionally, macroeconomic conditions are also likely to affect foreign exchange rates, domestic interest rates and inflation, which each has an effect on IC Power’s financial and operating costs.
Fluctuations in the exchange rates between local currencies in the countries in which IC Power operates and the U.S. Dollar, which is IC Power’s functional and reporting currency, will generate either
gains or losses on monetary assets and liabilities denominated in these local currencies and can therefore affect its profitability. Fluctuations in inflation rates may also increase labor costs and other local
expenses of IC Power’s operations, and it may be unable to pass such increases on to its customers (e.g., to customers who purchase energy or capacity from IC Power pursuant to long-term PPAs, which
are not linked to local inflation rates).

170

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
For further information on the risks associated with currency fluctuations, see “ Item 3.D Risk Factors—Risks Related to Our Strategy and Operations—Foreign exchange rate fluctuations and

controls could have a material adverse effect on IC Power’s earnings and the strength of its balance sheet .”

The following table sets forth the percentage growth in GDP, the currency appreciation / depreciation (relative to the U.S. Dollar), and the annual inflation rate for each of the countries in which

IC Power operates, according to segment.

Inflation 
Rate

2016

GDP 
Growth

Currency 
Appreciation 
(Depreciation)  

Inflation 
Rate

2015

GDP 
Growth
(%)

Currency 
Appreciation 
(Depreciation)  

Inflation 
Rate

2014

GDP 
Growth

Currency 
Appreciation 
(Depreciation)  

3.6 
(0.6)  

6.2 
4.5 
1.0 
0.7 

3.9 
4.0 

2.3 
4.4 
7.6 

4.7 
2.8 

4.5 
3.5 
2.4 
5.2 

3.7 
1.7 

5.9 
1.5 
2.2 

(6)  
1 

(5)  
1 
— 
— 

(1)  
(3)  

(2)  
(7)  
(11)  

3.5 
(0.6)  

4.0 
2.4 
(0.7)  
0.1 

4.1 
4.3 

0.8 
3.7 
5.0 

3.3 
2.5 

4.9 
4.1 
2.4 
5.8 

4.8 
2.3 

7.0 
0.9 
3.1 

(12)  
(9)  

(5)  
1 
— 
— 

(1)  
(15)  

(3)  
(6)  
(37)  

3.2 
(0.2)  

6.4 
3.4 
0.5 
2.1 

5.2 
4.6 

3.0 
6.4 
3.7 

2.4 
2.6 

4.0 
4.0 
1.8 
6.2 

5.2 
1.8 

7.3 
(0.5)  
4.6 

(11)
(12)

(5)
4 
— 
— 

— 
(23)

(6)
(10)
(7)

Country

Peru 
Israel 
Central America  
Nicaragua 
Guatemala 
El Salvador 
Panama 
Other
Bolivia 
Chile 
Dominican

Republic 

Jamaica 
Colombia 

For further information on the macroeconomic conditions of the key countries in which IC Power operates or in which it may operate in the future, see “ Item 4.B Business Overview—Our

Businesses—IC Power—Industry Overview .”

For further information on the sensitivity of our net income to changes in the CPI and certain exchange rates, see Note 30 to our financial statements included in this annual report.

Sales and Availability

The regulatory frameworks in each of the countries in which IC Power currently operates, other than Israel and Jamaica, establish marginal cost systems, and the relevant regulatory agencies

determine which generation units are to be dispatched, so as to minimize the cost of energy supplied.

The following table sets forth the weighted average availability of IC Power’s generation plants in each of the countries in which IC Power operates for the periods presented, according to

segment:

Peru  
Israel  
Central America
Nicaragua   
Guatemala   
El Salvador  
Panama (Kanan)  

Other

Bolivia   
Chile  
Dominican Republic  
Jamaica  
Colombia   

Year Ended
December 31, 2016  

Year Ended
December 31, 2015  

Year Ended
December 31, 2014  

79% 
91% 

88% 
95% 
97% 
69% 

92% 
98% 
78% 
85% 
97% 

97% 
97% 

90% 
94% 
96% 
— 

89% 
97% 
81% 
86% 
96% 

97%
90%

95%
97%
97%
— 

91%
96%
89%
85%
84%

A substantial portion of the capacity in each of the countries in which IC Power currently operates, other than Israel, Nicaragua and Jamaica, is comprised of hydroelectric plants. The marginal
cost of production by these plants is almost nil. As a result, these plants are generally the first to be dispatched, when available. However, the availability of these plants is subject to annual and seasonal
variations based on the hydrology of the reservoirs and river basins that provide the water to operate these plants. For example, COBEE’s hydroelectric plants are among the first generation units to be
dispatched in Bolivia as a result of the low variable costs associated with these units, and CDA’s plant is among the first generation units dispatched in Peru. IC Power seeks to ensure that its
hydroelectric units are available to be dispatched when necessary, as such availability is important to IC Power’s ability to capture the benefits of marginal cost dispatch and the maximization of its
margins.

171

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
When hydroelectric plants are unavailable or have been fully dispatched, other generation plants are generally dispatched on the basis of cost, with lower cost units, such as thermal gas plants,
generally dispatched first. The Kallpa facility units, for example, are among the first generation units to be dispatched in Peru after the hydroelectric plants, since the Kallpa plants are among the lowest-
cost thermal generation plants in Peru. Generally, the order in which regulatory agencies will dispatch plants which are neither hydroelectric nor gas-powered are: (1) wind-powered; (2) coal-powered;
(3) HFO-powered; followed by (4) diesel-powered. As many of the countries in which IC Power operates are seeking to incentivize the production of wind and renewable energy plants, which typically
have relatively low operating costs, these countries often dispatch wind-powered plants, such as Amayo I and Amayo II, on a priority basis. Similar to hydroelectric plants, however, the availability of
wind-powered plants to be dispatched is limited by the availability of the resource (i.e., whether the wind is blowing).

If IC Power’s generation plants are available for dispatch and are not dispatched, or are partially dispatched, by the relevant system operator and if IC Power’s obligations to deliver energy
under its PPAs exceed the energy dispatched from IC Power’s own generation units at any particular time, IC Power purchase energy in the spot market to satisfy these obligations. The price of such
energy is generally lower than IC Power’s generation cost, thereby generally increasing its commercial margin.

Similarly, if IC Power’s generation plants are not allocated sufficient firm capacity to satisfy its obligations under its PPAs, IC Power purchases capacity in the spot market to satisfy these

obligations. The spot capacity price is generally substantially similar to the regulated and PPA capacity price.

The following table sets forth the amount of energy sold under IC Power’s PPAs and in the spot market, and the amount of energy generated and purchased by IC Power’s generation companies

during the years presented, according to segment 1 :

Segment

Peru

Israel

Central America

Period

Sales under 
PPAs

Sales in 
Spot Market

(GWh)

Net 
Energy 
Generated 2

Energy 
Purchased

Kallpa:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

Samay I3:
Year Ended December 31, 2016

  CDA:
  Year Ended December 31, 2016

OPC-Rotem:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

OPC-Hadera:

  Year Ended December 31, 2016
  Year Ended December 31, 2015

ICPNH:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

Puerto Quetzal
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

Nejapa:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

Kanan:
Year Ended December 31, 2016

172

6,182 
6,327 
6,324 

— 

509 

3,908 
3,976 
3,973 

88 
23 

957 
1,062 
1,063 

528 
594  
1,005 

807 
794 
626 

523 

283 
106 
235 

94 

182 

— 
— 
— 

— 
— 

51 
28 
22 

185 
368 
53 

37 
53 
93 

7 

5,892 
5,027 
5,698 

94 

683 

3,422 
3,759 
3,400 

88 
23 

945 
1,054 
1,058 

347 
641 
465  

383 
436 
373 

164 

573 
1,406 
861 

— 

8 

486 
217 
573 

— 
— 

63 
36 
27 

366 
321 
593 

461 
411 
346 

366 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
 
  
 
 
  
  
 
 
 
 
 
 
 
  
  
 
 
 
 
 
 
  
 
 
  
  
 
 
  
 
 
  
  
 
 
 
 
 
  
 
 
  
  
 
  
 
 
  
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
  
  
  
  
 
  
  
  
  
 
 
 
 
 
  
  
  
  
 
  
  
  
  
 
 
 
 
 
  
  
  
  
 
  
  
  
  
 
 
 
 
 
  
  
  
  
 
 
Segment

Period

Sales under 
PPAs

Sales in 
Spot Market

(GWh) 

Net 
Energy 
Generated 2

Energy 
Purchased

Other

Total (excluding Pedregal)

_________________

COBEE:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014
Central Cardones:
Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

  Colmito:

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

  CEPP:

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

  JPPC:

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

  Surpetroil:

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

  Pedregal:

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

Year Ended December 31, 2016
Year Ended December 31, 2015
Year Ended December 31, 2014

275 
270 
268 

— 
— 
— 

254  
255  
250  

88  
—    
253  

390  
427  
410  

73  
43  
48  

289  
280  
270  

14,582  
13,748  
14,220  

585 
769 
762 

1 
4 
— 

9 
26 
— 

257 
291 
54 

— 
— 
— 

2 
— 
— 

69 
102 
135 

1,693 
1,645 
1,219 

860 
1,039 
1,030 

(1) 
3 
— 

8 
26 
5 

257 
291 
236 

390 
427 
410 

75 
43 
48 

255 
343 
391 

13,607 
12,746 
12,723 

— 
— 
— 

2 
1 
— 

255 
255 
245 

88 
— 
71 

— 
— 
— 

75 
— 
— 

103 
39 
14 

2,668 
2,647 
2,716 

1. The information included within the table reflects 100% of the energy sold under PPAs, sold in the spot market, generated, and purchased by IC Power’s assets, regardless of its ownership interest in

the entity that owns each such asset, and also contains information for certain of IC Power’s assets from periods prior to acquisition of such asset. For further information on IC Power’s acquisition
of assets during the periods within the table, see “— Capacity Growth .”

2. Net energy generated is defined as energy delivered at the interconnection to the system.
3.

In May 2016, Samay I reached its COD. In July 2016, all four of Samay I’s units were declared unavailable to the system due to damage to the shafts in the three of the plant’s four units. By
February 2017, all four of the units had been declared available to the system.

Cost of Sales of Generation Assets

IC Power’s principal costs of sales are natural gas, HFO, lubricants, purchases of capacity and energy on the spot market, transmission costs, personnel, third-party services and maintenance

costs.

IC Power’s costs for natural gas, which include transportation costs, vary primarily based on the quantity of natural gas consumed, the variation of market prices of HFO, to which IC Power’s

natural gas prices are indexed, and whether IC Power consumes all of the natural gas that it is obligated to purchase under its natural gas supply contracts. Kallpa’s long-term gas supply contract with the
Camisea Consortium, which is also used to supply gas to Las Flores, hedges Kallpa against fluctuations in the price of natural gas; however, Kallpa’s agreement with the Camisea Consortium will expire
in June 2022, unless renewed by the parties. Once expired, Kallpa and Las Flores may be required to purchase their natural gas on spot markets at prices that may be greater than the prices they
previously paid for such commodities and could therefore face increased volatility in their earnings and cash flows. The price adjustments in IC Power’s PPAs, which are generally indexed to the cost of
natural gas, generally limit its exposure of such renewal.

173

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
 
 
  
  
 
 
 
 
 
 
 
 
  
  
  
  
 
 
 
 
 
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
 
 
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
 
 
  
  
  
  
 
 
 
 
 
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
 
 
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
 
 
 
 
  
  
  
  
 
 
 
 
 
 
 
 
 
The price at which OPC-Rotem purchases its natural gas from its sole natural gas supplier, the Tamar Group, is predominantly indexed (in excess of 70%) to changes in the EA’s generation

component tariff, pursuant to the price formula set forth in OPC-Rotem’s supply agreement with the Tamar Group. As a result, increases or decreases in this tariff have a related effect on OPC-Rotem’s
cost of sales and margins. Additionally, the natural gas price formula in OPC-Rotem’s supply agreement is subject to a floor mechanism. PUAE generation component tariffs were lower in 2015 as
compared to 2012-2014. Additionally, on September 8, 2015, the PUAE published a final decision, which became effective on September 13, 2015, and which further reduced the PUAE generation
component tariff by approximately 12% from NIS 300.9 per MWh and NIS 301.5 per MWh to a single tariff of NIS 265.2 per MWh. In addition, in December 2016, the EA published its generation
component tariff update, which became effective on January 1, 2017, and further reduced the generation component tariff by approximately 0.5% from NIS 265.2 per MWh to NIS 264 per MWh. As a
result of previous declines in the PUAE generation component tariff, OPC-Rotem began to pay the ultimate floor price in November 2015. Therefore, the September 2015 decline, the January 2017
decline and any further declines in the EA generation component tariff, will not result in a corresponding decline in OPC-Rotem’s natural gas expenses, and may lead to a greater decline in OPC-
Rotem’s margins. The next annual update of the generation component tariff is expected to be conducted in December 2017.

IC Power’s costs for HFO, which include transportation costs, vary primarily based on the quantity of HFO consumed and the variation of market prices of HFO. For example, IC Power

generates electricity using HFO in each of the countries comprising its Central America segment, as well as in the Dominican Republic. The price adjustment mechanisms in IC Power’s PPAs in these
countries generally limit its exposure to the price of HFO.

As fuel is a significant cost for most of IC Power’s operating companies, the price of various fuels ( e.g. , gas, diesel, or HFO) has a significant effect on its costs. However, as prices in the spot

market tend to reflect current fuel prices and, as the majority of IC Power’s PPAs contain a fuel price adjustment mechanism to reflect increases or decreases in the price of fuel, changes in fuel prices
generally result in corresponding changes in revenues as a result of these pass-through mechanisms and do not substantially affect IC Power’s operating margins. Accordingly, while the decline in global
oil prices since 2014 has resulted, in part, in a decline in IC Power’s revenues for the year ended December 31, 2016, such decline in global oil prices did not have a commensurate effect on IC Power’s
operating margins or Adjusted EBITDA for that year. In some cases, however, the fuel price adjustment mechanisms in IC Power’s PPAs may not adjust to reflect the full increase or decrease in fuel
prices, or may reflect such adjustments on a lagging basis as a result of the indexation mechanisms of its PPAs (which update only periodically and have minimum thresholds) and the indexations of IC
Power’s long-term supply agreements.

IC Power’s costs for transmission vary primarily according to the quantity of energy that IC Power sells and the locations of the specific nodes to which its plants are connected in the national

interconnected electrical systems of the various countries in which IC Power operates. Under its PPAs and the regulatory regimes under which IC Power sells energy in the spot market, most
transmission costs are passed on to IC Power’s customers.

IC Power incurs personnel and third-party services costs in the operation of its plants. These costs are usually independent of the volumes of energy produced by IC Power’s plants. IC Power

incurs maintenance costs in connection with the ongoing and periodic maintenance of its generation plants. These costs are usually correlated to the volumes of energy produced and the number of
running hours of IC Power’s plants.

Distribution Tariffs, Energy Costs and VAD Charges for IC Power’s Distribution Assets

Regulated energy tariffs in Guatemala are divided into two components: an electricity charge (for the cost of electricity and capacity and transmission tolls) and the VAD. Energy, capacity and
transmission are pass-through costs for Energuate, since the tariffs Energuate charges its customers are adjusted to reflect changes in its costs of energy and capacity purchased and the transmission tolls
it pays. Although some temporary differences may exist during the adjustment process, the tariff structure is generally designed to allow Energuate to pass through to customers its energy, capacity and
transmission costs. Accordingly, because Energuate passes through the energy, capacity and transmission components of the regulated tariffs to its customers, its margins are primarily driven by the
VAD charges.

The VAD charges applicable to Energuate are established every five years under procedures set forth in the General Electricity Law and related regulations. The VAD charges currently
applicable to Energuate were established in January 2014 and are scheduled to be reset in January 2019. For further information on the tariffs applicable to Energuate, see “ Item 4.B Business Overview—
Our Businesses—IC Power’s Description of Operations—Distribution Operations—Distribution Tariffs .”

The VAD charges applicable to Energuate are also adjusted in January and July of each year to reflect the effects of Guatemalan inflation and changes in the Guatemalan Quetzales/U.S. dollar

exchange rate on IC Power’s operations.

Effects of Outstanding Indebtedness, including Financial Leases

IC Power’s total outstanding consolidated indebtedness was $3,072 million as of December 31, 2016, excluding the $145 million note payable to Kenon.

IC Power originally financed its acquisition of the Kallpa I, II and III turbines and the Las Flores power plant through financial leases. As a result, it has recognized these turbines and power
plant as property, plant and equipment and has recognized the related lease obligations as loans from banks and others, but did not recognize any cash flow from financing activities upon its entry into
these financing agreements. Payments under these leases were recognized in IC Power’s statement of cash flows as cash flows from financing activities at the time that these payments are made. The
Kallpa I lease matured in March 2016. In May 2016, the proceeds of Kallpa’s 4.875% senior unsecured notes due May 24, 2026 were principally used to repay all of Kallpa’s outstanding debt (including
its short-term debt), other than debt relating to the Las Flores lease.

174

 
 
 
 
 
 
 
 
 
 
 
 
IC Power is also committed to expanding its operations by developing greenfield assets in accordance with three fundamental principles, one of which includes securing long-term project

financing agreements to finance its development efforts. These financing agreements are generally stand alone, secured, project-specific, and with no or limited recourse to IC Power. IC Power expects
that the commitment to its operational expansion will result in the incurrence of additional indebtedness, which may, in turn, result in an increase in its outstanding consolidated indebtedness.

Furthermore, as IC Power continues to develop its assets by (1) drawing down on its existing credit facilities with third parties or (2) securing additional third-party financing, as discussed

above, to fund its capital expenditures with respect to new assets or projects, it may experience an increase in interest costs. Many of IC Power’s debt agreements have floating interest rates ( e.g. , many
of the debt instruments bear interest rates based on LIBOR) and, notwithstanding any interest rate swaps which IC Power has entered, or may enter, into to address this risk, a continued increase in
interest rates could increase its interest expenses and the cost of the capital required to continue to fund its development and expansion efforts. Other than with respect to some or all of the indebtedness
of certain of its subsidiaries, including OPC-Rotem, DEORSA, DEOCSA, ICPI and COBEE, among others, IC Power’s outstanding indebtedness primarily is either denominated in, indexed to, or is the
subject of interest rate swaps tied to, the U.S. Dollar. For further information on IC Power’s outstanding indebtedness, including the interest rate and currency applicable to the indebtedness, see “ Item
5.B Liquidity and Capital Resources—IC Power’s Liquidity and Capital Resources—IC Power’s Material Indebtedness .”

Negative Goodwill

IC Power’s development strategy contemplates the acquisition of energy assets in attractive markets, from time to time, in connection with its capacity expansion efforts. Based upon the

difference between the amount paid, which IC Power records in connection with its acquisition of such assets, and the net asset fair value, it may recognize a gain on bargain purchase at the purchase
date.

For the years ended December 31, 2016 and 2015, IC Power did not recognize a gain on bargain purchases. For the year ended December 31, 2014, IC Power recognized gains on bargain

purchases of $24 million, $24 million and $20 million in connection with its acquisitions of ICPNH in March 2014, JPPC in May 2014 and Puerto Quetzal in September 2014, respectively.

Income Taxes

IC Power operates through various subsidiaries in several countries and, as a result, is subject to income tax in various jurisdictions. The following table sets forth the corporate income tax rates

applicable as of December 31, 2016, 2015 and 2014 in each of the countries in which IC Power operates:

Singapore   
Peru 1  
Israel 2  
Central America
Nicaragua 3  
Guatemala   
El Salvador  
Panama  

Other

Bolivia   
Chile 4   
Dominican Republic  
Jamaica 5  
Colombia 6   

_____________________

2016

Year Ended December 31,
2015
(%)

2014

17% 
30% 
25% 

25% 
25% 
30% 
25% 

25% 
24% 
27% 
33.3% 
40% 

17% 
28% 
26.5% 

25% 
25% 
30% 
25% 

25% 
22.5% 
27% 
33.3% 
39% 

- 
30%
26.5%

25%
28%
30%
25%

25%
21%
28%
33.3%
34%

1. The corporate income tax rate in Peru decreased to 28% in 2015 and is scheduled to increase to 29.5% in 2017. The dividend tax rate increased to 6.8% in 2015 and is scheduled to decrease to 5% in

2017. Distributions of profits for 2014 were subject to a tax rate of 4.1%. Kallpa, CDA and Samay I entered into legal stability agreements with the relevant tax authority in Peru pursuant to which,
during the term of the corresponding agreement, Kallpa, CDA and Samay I, respectively, will be subject to the income tax regime in place at the time each such agreement was entered into, which
stipulates a 30% income tax rate, and not the general income tax regime applicable to other firms in Peru. Kallpa terminated its stability agreement in December 2016, and CDA and Samay I's
stability agreements expire in 2022 and 2024, respectively. Only after CDA and Samay I’s tax agreements expire, or if CDA and Samay I terminate the corresponding agreement, will they be subject
to the general income tax regime of Peru and receive the benefit of the changes in the Peruvian income tax rates described above.

175

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2. The corporate income tax rate in Israel decreased to 25% on January 1, 2016 and 24% on January 1, 2017, and will be further reduced to 23% on January 1, 2018.
3. The statutory rate in Nicaragua in 2012-2015 was 30%. However, Corinto and Tipitapa Power are subject to 25% income tax, based on a Foreign Investment Agreement signed in June 2000, which
protects them from any unfavorable changes in the tax law. In addition, Amayo I and Amayo II are tax exempt from income tax payments, in accordance with Law No.532 for Electric Power
Generation with Renewable Sources Incentive, up to a period of seven years after their CODs; such period expired for Amayo I in March 2016, and will expire for Amayo II in March 2017.

4. The corporate income tax rate in Chile increased to 22.5% in 2015 and 24% in 2016, and is scheduled to increase to 25% in 2017 for shareholders on the attribution method or decrease to 22.5% in

2017 for shareholders on the cash-basis method. The corporate income tax rate is scheduled to increase to 27% in 2018 for shareholders on the cash-basis method.
33.3% is the rate applied to regulated companies in Jamaica, including the companies regulated by Office of Utilities Regulation.

5.
6. The aggregate income tax rate of 34% in Colombia is composed of a base corporate income tax rate of 25% plus the “income tax for equality,” or CREE, tax at a rate of 9%. Beginning in 2015, a

surcharge to the CREE tax rate of 5% on income in excess of 800 million Colombian pesos (approximately $272 million) would effectively increase the aggregate income tax rate to approximately
39%. The surcharge on the CREE tax increased to 6% in 2016 and 2017, and is expected to decrease to 4% in 2018, effectively representing an aggregate income tax rate of approximately 40%,
40% and 37% in 2016, 2017 and 2018, respectively, before being eliminated. The aggregate income tax rate will be 33% in 2019.

For further information on the tax rates, including withholding tax rates, applicable to IC Power’s operating companies, see Note 25 to our audited financial statements included in this annual

report.

Effects of Discontinued Operations

In September 2014, IC Power completed the sale of its indirect equity interest in Enel Generación Perú for $413 million (which resulted in recognition by IC Power of $110 million of net

profit). As a result, the results of operations of Generandes (the entity through which IC Power held an indirect equity interest in Enel Generación Perú) are reflected as discontinued operations in IC
Power financial statements presented in this annual report.

Factors Affecting Comparability of Operating and Financial Results

IC Power’s operational and financial results for the year ended December 31, 2016, 2015 and 2014 have been affected by its acquisitions of various operating businesses and these effects must

be understood in order to assess the comparability of IC Power’s operating and financial results in the period to period financial analysis set forth below.

Acquisition of Energuate

In January 2016, IC Power completed acquisition of Energuate, comprised of two electricity distribution companies in Guatemala (DEORSA and DEOCSA), and two smaller, related companies

(Guatemel and RECSA).

For all periods prior to the completion of its acquisition of Energuate, IC Power operated one business line (generation) and evaluated this business line according to four geographic segments.

However, since January 22, 2016, the date on which IC Power completed acquisition of Energuate, its results of operations reflect an additional business line (distribution), which IC Power evaluates
according to its sole segment, distribution. IC Power distribution business and its segment consists entirely of DEORSA and DEOCSA. Energuate, which will be one of the principal operations within IC
Power’s business moving forward, contributed $509 million, $91 million and $63 million to IC Power’s revenues, gross profit, and operating income, respectively, during the year ended December 31,
2016 (since January 22, 2016, the date of the completion of the acquisition). Guatemel and RECSA are not included within IC Power distribution business and have been included in IC Power Central
America and Other segment, respectively, as a result of their business lines.

While the interest, depreciation, maintenance and similar expenses related to, or resulting from, acquisition and ownership of these businesses are reflected in IC Power’s results for the year

ended December 31, 2016, and its consolidated statement of income includes the results of the acquired companies’ operations since January 22, 2016 (the date of the completion of the acquisitions), the
results of these businesses are not fully reflected in IC Power’s results of operations for the year ended December 31, 2016. The results of these businesses will affect the comparability of IC Power’s
results of operations from all periods prior to the acquisition.

Completion of Construction and Acquisition of Generation Assets

During the year ended December 31, 2016, IC Power completed the construction of the Kanan, Samay I and CDA plants, which provided IC Power with 1,269 MW of additional capacity.

These plants generated 941 GWh of energy during the year ended December 31, 2016. Additionally, during the year ended December 31, 2015, IC Power successfully completed the acquisition of OPC-
Hadera, which provided IC Power with an additional 18 MW of installed capacity in Israel and generated 23 GWh of energy (since the date of its acquisition) and 88 GWh of energy during the years
ended December 31, 2015 and 2016, respectively. As a result, IC Power’s increase in GWh for the years ended December 31, 2016 and 2015 reflects the contribution of its developed and acquired
companies, and with respect to the acquired companies, also includes certain amounts generated by these companies prior to acquisition of these companies by IC Power. As IC Power’s financial results
for the years ended December 31, 2016 and 2015, such as sales and cost of sales, reflect the financial results of the developed assets from the date of COD and the acquired assets from the date of
acquisition and consolidation, IC Power’s operating results for the years ended December 31, 2016 and 2015 may not be comparable to the financial results for the period to the extent of businesses
developed or acquired in the period.

176

 
 
 
 
 
 
 
 
 
 
 
 
As IC Power seeks to invest in additional assets through the development of or the acquisition of controlling interests in new operating assets, these factors may also affect the comparability of

its operating and historical financial results in future periods.

EA Tariffs Affect IC Power’s Results in its Generation Business’ Israel Segment

In Israel, sales of IPPs are generally made on the basis of PPAs for the sale of energy to customers, with prices predominantly linked to the tariff issued by the EA (which replaced the PUAE in

January 2016) and denominated in New Israeli Shekels.

The EA operates a Time of Use tariff, which provides different energy rates for different seasons (e.g., summer and winter) and different periods of time during the day. Within Israel, the price

of energy varies by season and demand period. For further information on Israel’s seasonality and the related EA tariffs, see “ Item 4.B Business Overview—Our Businesses—IC Power—Industry
Overview—Overview of Electricity Generation Industry—Israel. ”

The PUAE’s rates have affected IC Power’s revenues and income in the periods under review. PUAE tariffs in the period 2012 to 2014 were incrementally higher to reflect higher fuel prices in

2012, which the PUAE determined would be reflected in higher tariffs in 2012-2014. The revenues in IC Power’s Israel segment in 2015 were affected by the lower PUAE tariffs, as discussed further
below. Additionally, on September 8, 2015, the PUAE published a final decision, which became effective on September 13, 2015, which further reduced the PUAE generation component tariff by
approximately 12% from NIS 300.9 per MWh and NIS 301.5 per MWh to a single tariff of NIS 265.2 per MWh.

In addition, in December 2016, the EA published its generation component tariff update, which became effective on January 1, 2017, and further reduced the generation component tariff by

approximately 0.5% from NIS 265.2 per MWh to NIS 264 per MWh. However, as part of the December 2016 EA decision, the time of use tariffs were also adjusted to reflect a decrease in certain
payments made by IPPs to the IEC. As a result of such adjustment, OPC-Rotem's tariffs effectively increased by approximately 2% (despite the 0.5% reduction in the generation component tariff).

As a result of previous declines in the PUAE generation component tariff, OPC-Rotem began to pay the ultimate floor price set forth in its supply agreement in November 2015. Therefore, the

September 2015 decline, the January 2017 decline and any further declines in the EA generation component tariff will not result in a corresponding decline in OPC-Rotem’s natural gas expenses, and
will lead to a greater decline in the sales price of OPC-Rotem’s energy, revenues and, therefore, margins. For further information on the EA and the EA tariffs, see “ Item 4.B Business Overview—Our
Businesses—IC Power—Regulatory, Environmental and Compliance Matters—Regulation of the Israeli Electricity Sector—EA .”

CNEE Regulations Affect IC Power’s Results in its Distribution Business in Guatemala

Energuate’s results of operations are significantly affected by the tariffs that it charges for electricity. The tariffs that Energuate charges to its regulated customers are set by CNEE based on the
methodology established by the General Electricity Law and related regulations. Energuate’s tariffs for regulated customers consist of electricity charges designed to allow a model efficient distribution
company to cover its operating expenses, complete its capital expenditure plans and recover its cost of capital. Under the General Electricity Law and the regulations of the CNEE, the base tariff is
adjusted annually each year on May 1 to reflect anticipated changes in the cost of electricity to be purchased by Energuate during the following year, so as to allow Energuate to recover the projected
cost of electricity and capacity purchases, transmission tolls, and electricity losses during the following year. Additionally, an electricity adjustment surcharge is added or subtracted to the base tariff
quarterly to reflect variations in the actual cost of electricity and capacity purchases and transmission tolls paid by Energuate against the projected cost envisaged by the tariff. Any resulting variation in
each quarter is considered by the CNEE in its determination of the applicable tariffs for the next quarter or subsequent quarters, if, in the latter case, the difference was considered significant by the
CNEE and Energuate consented to such variation. Pursuant to the CNEE resolutions published in October 2016, the energy adjustment surcharge applicable to IC Power for the period from November 1,
2016 to January 31, 2017 was determined to be a net reduction of IC Power’s energy charges of approximately $8 million. In addition, the October 2016 resolution established an accrual of
approximately $33 million to be applied to reduce energy charges in future periods as agreed between Energuate and the CNEE. The VAD component of the distribution tariff is revised every five years
with semi-annual adjustments for inflation and local currency exchange rates against the U.S. Dollar. Approximately 57% of each semi-annual adjustment is based on the rate of Guatemalan inflation
and the remaining 43% is based on changes in the Guatemalan Quetzales/U.S. Dollar exchange rate. The VAD charges applicable to Energuate were last set in January 2014 and will expire in January
2019. For further information on the tariffs applicable to Energuate, see “ Item 4.B Business Overview—Our Businesses—IC Power’s Description of Operations—Distribution Operations—Distribution
Tariffs ” and “ Item 4.B Business Overview—Our Businesses—IC Power—Regulatory, Environmental and Compliance Matters—Regulation of the Guatemalan Electricity Distribution Market—Tariffs
and Tolls .”

177

 
 
 
 
 
 
 
 
 
As Guatemala’s regulated tariff regime is designed to match the electricity charge component of Energuate’s regulated tariff to the cost for the electricity distributed to regulated customers,

Energuate does not generate a material portion of its gross margin from the difference between its cost for electricity and the revenue generated from the electricity charge component of its tariffs.
Instead, Energuate’s gross margin is primarily generated by the distribution component of Energuate’s regulated tariffs, consisting of VAD charges. In setting the tariff, the range for permitted theoretical
after-inflation return on investment for distributors is between 7%—13%. Currently, the tariffs approved for Energuate’s authorizations contemplate approximately a 7% return.

Energuate charges a regulated VAD charge to regulated customers for the distribution of electricity and charges regulated distribution tariffs for the distribution of electricity to its large users.

Energuate distributed 96%, 93% and 92% of the volume of energy it delivered in the years ended December 31, 2016, 2015 and 2014, respectively, to its regulated customers.

In addition, Energuate is required to provide electricity to all customers that consume up to 300 kWh at a reduced tariff known as the “social tariff.” The social tariff includes a VAD charge that
is lower than the VAD charge paid by regulated customers that are not eligible for the social tariff. In the years ended December 31, 2016, 2015 and 2014, 52%, 51% and 51%, respectively, of the energy
delivered by Energuate to its customers were delivered to customers whose energy purchases were subject to the social tariff.

Decisions by the EA Regarding System Management Charges

Kenon’s and IC Power’s financial statements as of December 31, 2014 and March 31, 2015 previously authorized for issuance included provisions (beginning in June 2013) by OPC-Rotem for

system management service charges and diesel surcharges in the aggregate amount of $70 million as of December 31, 2014 and $79 million as of March 31, 2015. In August 2015, the EA published a
decision detailing the amounts that IPPs in Israel would be obligated to pay system management service charges, retroactively from June 2013.

In accordance with IFRS, Kenon adjusted its provisions as of June 30, 2015, such that the adjusted balance of the provision as of such date in Kenon’s financial statements was $38 million,

resulting in a credit of $52 million to net profit attributable to Kenon’s shareholders after tax effect. Kenon was not required to revise its financial statements as of December 31, 2014 or March 31, 2015,
as Kenon’s financial statements for these periods were already approved at the time of the EA’s August 2015 decision and the provisions recorded in those financial statements represented Kenon
management’s best estimate of the expenditure required to settle the obligation, based on the information available at the time the financial statements were finalized.

Because IC Power reapproved its financial statements in connection with IC Power’s filing of a registration statement on Form F-1 with the SEC, with such reapproval taking place subsequently

to the EA’s August 2015 publication, IC Power adjusted the previously recorded provisions, such that the adjusted balance of the provision as of December 31, 2014 and December 31, 2015 was $27
million and $47 million, respectively. This adjustment resulted in adjustments to IC Power’s income statement (a $46 million decrease in cost of sales, as well as adjustments to tax expenses and net
income, in 2014, which resulted in a corresponding increase in IC Power’s Adjusted EBITDA in 2014) and in its statement of financial position as of the end of 2014. Accordingly, income statement
figures in IC Power’s financials for 2014 and 2015 differ from those attributable to IC Power in Kenon’s financials for those periods.

The discussion of IC Power’s results of operations below is based on IC Power’s consolidated financial information which reflects the adjustments to provisions in 2014, and since this

adjustment was made by Kenon in 2015, the results for IC Power in 2014 and 2015 for cost of sales differ from amounts set forth in Kenon’s consolidated financial statements. For the year ended
December 31, 2015, IC Power’s cost of sales, as reported by Kenon, was $863 million, whereas IC Power’s cost of sales for the period, as reported by IC Power, was $909 million. For the year ended
December 31, 2014, IC Power’s cost of sales, as reported by Kenon, was $983 million, whereas IC Power’s cost of sales for the period, as reported by IC Power, was $936 million.

In addition, as a result of the above, certain income statement amounts below cost of sales for the years ended December 31, 2014 and 2015 differ from amounts set forth in Kenon’s

consolidated financial statements.

Fluctuations in Oil Prices and Currency Exchange Rates

As fuel is a significant cost for most of IC Power’s operating companies, the prices of the various fuels utilized by its operating companies (e.g., gas, diesel, or HFO) have a significant effect on

IC Power’s results of operations. Many of IC Power’s PPAs, including all of OPC-Rotem’s PPAs, are denominated in the applicable local currency and contain an adjustment mechanism so that prices
under its PPAs can be adjusted to reflect (among other things) changes in (i) the price of oil (by reference to oil price indices), (ii) the price of the underlying fuel, (iii) the relevant producer price index
and/or (iv) changes in the local currency to U.S. Dollar exchange rate. In addition, for most of IC Power’s gas and other fuel supply agreements, the prices IC Power pays is subject to adjustments based
on changes in oil prices (by reference to oil price indices), the price of the underlying fuel, and currency exchange rates. Accordingly, although changes in oil, or other fuel, prices, inflation rates and
foreign exchange rates can affect IC Power’s revenues, net income and Adjusted EBITDA, there is generally not a corresponding effect on its margins.

178

 
 
 
 
 
 
 
 
 
 
 
These adjustments under IC Power’s PPAs and supply agreements, and regulated tariffs are made on a periodic basis (e.g., monthly, quarterly or annually) and may also be subject to minimum

deviation thresholds.

Therefore, these adjustments do not fully hedge IC Power’s margins against changes in fuel prices and such other factors. In addition, IC Power remains subject to variations in oil, or other fuel,

prices, inflation and currency exchange rates in the short- to medium-term until such adjustments are made and to the extent of variations below the threshold. Further, while a significant portion of IC
Power’s sales are made pursuant to PPAs, IC Power does make sales in the spot market and is subject to spot market prices (which are influenced by changes in oil, or other fuel, prices, inflation and
exchange rates), and it is also subject to changes in market rates (which are influenced by fuel prices and inflation and exchange rates) when it renews its PPAs. A significant change (even where both
fuel costs and PPAs are fully indexed) in the above mentioned factors can result in an increase or decrease in IC Power’s margins. For further information on the effects of fluctuations in oil prices on IC
Power’s cost of sales, see “— Cost of Sales and Services (excluding Depreciation and Amortization) .”

With respect to IC Power’s distribution business, all of Energuate’s PPAs require it to pay in U.S. Dollars or have price terms that are linked to the U.S. Dollar and inflation affects Energuate’s

operating costs by increasing some of its operating expenses denominated in Guatemalan Quetzales (and not linked to the U.S. Dollar). However, because the VAD charges applicable to Energuate are
adjusted semi-annually to reflect fluctuations in the Guatemalan Quetzal/U.S. Dollar exchange rate and Guatemalan inflation, currency depreciation and inflation have not had significant effects on
Energuate’s operating income. Additionally, as the regulated tariff set by CNEE is also adjusted for fluctuations in oil prices, a decrease in oil prices may cause a corresponding decrease in the tariff set
by CNEE, leading to a decline in Energuate’s revenues in an amount that generally corresponds to a decline in Energuate’s operating expenses.

Qoros

Set forth below is a discussion of the material factors affecting the results of operations of Qoros for the periods under review.

Qoros commenced commercial operations at the end of 2013, and, as a result, generated revenues for the first time during the fiscal year ended December 31, 2013. Qoros has incurred losses

since its inception, as it invests heavily in product research and development and its commercial operations.

During 2016, Qoros launched the Qoros 5 SUV and the Qoros 3 GT. During 2015, Qoros launched the new 2016 model year versions of the Qoros 3 sedan, the Qoros 3 Hatch and the Qoros 3
City SUV. During 2014, Qoros launched two vehicle models —the Qoros 3 Hatch and the Qoros 3 City SUV. Qoros has incurred significant expenses, including financing costs, in connection with the
launches of its various vehicle models, including expenses relating to the development and marketing of these vehicle models. In the years ended December 31, 2016 and 2015, Qoros incurred net losses
of RMB1.9 billion and RMB2.5 billion, respectively. Qoros is continuing to experience losses and negative operating cash flow and expects that this will continue until it achieves significantly higher
levels of sales.

Qoros remains subject to risks inherent in the establishment of a new business enterprise, including risks relating to uncertain and unpredictable revenues and possible cost overruns due to cost
increases in services and supply materials. For the year ended December 31, 2016, Qoros sold approximately 24,000 cars, as compared to approximately 14,000 cars in 2015. If Qoros is unable to ramp
up sales, Qoros’ operations will continue to generate net losses. Qoros’ ability to generate positive net income and cash flow from its operations will depend upon a variety of factors, such as
macroeconomic conditions in China, conditions in the Chinese passenger vehicle market, including competition and government regulations, and Qoros’ ability to sell its vehicles within its targeted price
range and develop an effective dealer network. If Qoros is unable to substantially increase its sales, Qoros may not be able to generate positive net income or cash flow or achieve or sustain profitability,
any of which may result in an inability to continue its commercial operations altogether.

Kenon has used a significant portion of the cash received in connection with its spin-off from IC and available amounts under the IC Credit Facility to provide financing and guarantees to
Qoros. Qoros will need to secure additional financing to meet its operating expenses (including accounts payable) and debt service requirements. If Qoros is not able to raise additional financing as
required, it may be unable to continue operations, in which case Kenon may lose its entire investment in Qoros and Kenon may be required to make payments under its back-to-back guarantees to Chery
in respect of Qoros’ bank debt and pledges over Qoros shares by Quantum (Kenon's subsidiary which owns Kenon's interest in Qoros) may be enforced. See “ Item 3.D Risk Factors — Risks Related to
Our Strategy and Operations — Qoros will require additional capital resources to meet its operating expenses .”

ZIM

On July 16, 2014, ZIM completed its financial restructuring, which resulted in IC, and consequently, Kenon, owning 32% of the restructured ZIM as compared to IC’s previous interest in ZIM
of approximately 99.7% and reduced ZIM’s outstanding indebtedness and liabilities (face value, including future off-balance sheet commitments in respect of operational leases and with respect to those
parties participating in the restructuring) from approximately $3.4 billion to approximately $2 billion. As a result, Kenon received a 32% equity interest in ZIM upon the consummation of the spin-off.

179

 
 
 
 
 
 
 
 
 
 
 
ZIM’s results of operations for the six months ended June 30, 2014 are reflected as discontinued in Kenon’s results of operations and ZIM’s results of operations for the six months ended

December 31, 2014 and the years ended December 31, 2015 and 2016 are reflected in Kenon’s share in losses of associated companies, net of tax, pursuant to the equity method of accounting.

In addition, bunker prices and freight rates are material factors which affect ZIM’s results of operations. For a discussion of bunker prices and freight rates, see “ Item 4.B Business Overview—

Our Businesses—ZIM—ZIM’s Industry Update. ”

Primus

In the year ended December 31, 2016, Primus did not generate material revenues from its operations.

Primus seeks to operate as a producer of alternative liquids and generate revenues from construction management and engineering fees, technology licensing fees and production royalties, and,
from plants in which Primus expects to have an equity interest, operating revenue from the sale of methanol and gasoline. Where Primus develops a plant for a customer, Primus intends to pass through
the costs of developing the plant to the customer.

Critical Accounting Policies and Significant Estimates

In preparing our financial statements, we make judgments, estimates and assumptions about the carrying amounts of assets and liabilities that are not readily apparent from other sources. Our

estimates and associated assumptions are reviewed on an ongoing basis and are based upon historical experience and various other assumptions that we believe to be reasonable under the circumstances.
Actual results may differ from these estimates under different assumptions or conditions. We believe that the estimates, assumptions and judgments involved in the accounting policies described below
have the greatest potential impact on our financial statements:

·

·

·

Impairment analysis;

Revenue recognition;

Provisions for legal claims; and

· Useful life of property, plant and equipment.

Set forth below is a discussion of impairment analyses conducted by Kenon and its subsidiaries and associated companies. For further information on the estimates, assumptions and judgments

involved in our accounting policies, see Note 2 to Kenon’s financial statements included in this annual report.

Impairment Analysis

For each reporting period, Kenon examines whether there have been any events or changes in circumstances which would indicate an impairment of one or more non-monetary assets or cash
generating units, or CGUs. Additionally, when there are indications of an impairment, a review is made as to whether the carrying amount of the non-monetary assets or CGUs exceeds the recoverable
amount and, if so, an impairment loss is recognized. An assessment of the impairment of the goodwill is performed once a year or when signs of an impairment exist.

Under IFRS, the recoverable amount of the asset or CGU is determined based upon the higher of (i) the fair value less costs of disposal and (ii) the present value of the future cash flows
expected from the continued use of the asset or CGU in its present condition, including cash flows expected to be received upon the retirement of the asset from service and the eventual sale of the asset
(value in use). The future cash flows are discounted to their present value using a discount rate that reflects current market assessments of the time-value of money and the risk specific to the asset or
CGU.

The estimates regarding future cash flows are based upon past experience with respect to this asset or similar assets (or CGUs), and on Kenon’s businesses best possible assessments regarding
the economic conditions that will exist during the remaining useful life of the asset or CGU. Such estimates rely on the particular business’ current development plans and forecasts. As the actual cash
flows may differ, the recoverable amount determined could change in subsequent periods, such that an additional impairment loss may need to be recognized or a previously recognized impairment loss
may need to be reversed.

180

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Impairment Test for IC Power

At least once a year, IC Power performs an assessment of the impairment of the goodwill in its CGUs to which goodwill has been allocated. As of December 31, 2016, 2015 and 2014, IC Power

determined that the carrying amount of the CGUs to which goodwill has been allocated did not exceed the recoverable amount.

At the end of each reporting period, IC Power assesses whether there is any indication that any of the CGUs may be impaired and consider, among other things, whether there are indications of

any of the following:

·

·

·

Significant changes in the technological, economic or legal environment in which the CGUs operate, taking into account the country in which each CGU operates;

Increases in interest rates or other market rates of return, which are likely to affect the discount rates used in calculating each CGU’s recoverable amount;

Evidence of obsolescence or physical damage of each CGU’s assets;

· Actual performance of each CGU that does not meet expected performance indicators (e.g., its budget);

· Declines in tariffs agreed upon in PPAs and/or in current energy prices;

·

Increases in fuel and/or gas prices and other power generation costs; and

· New laws and regulations, or changes in existing laws and regulations, that could have an adverse effect on the power generation industry.

During 2014, one of Inkia’s subsidiaries updated its five-year budget as a result of a downward trend in its results combined with anticipated impacts of political changes in the country in which
the subsidiary operates, which affects the power generation business therein, and expectations of an increase in operating costs and unchanged electricity prices, which will probably lead to a decrease in
its profitability. As a result, Inkia considered a potential impairment in this subsidiary and conducted an impairment analysis using the value in use method and a discount rate of 7.6%. Accordingly,
Inkia determined that the book value of the subsidiary’s assets exceeded its recoverable amount and therefore recorded an impairment loss of $35 million in the year ended December 31, 2014.

At the end of 2015, Inkia performed an impairment test on the long-lived assets of this subsidiary to identify whether the impairment loss should be reversed or whether an additional
impairment loss is required. As a result of this assessment, no reversal or additional impairment loss was required as of December 31, 2015. However, due to the sensitivity of the assumptions used, IC
Power believes that minor changes in the key assumptions may materially affect the carrying value of this subsidiary in the future.

As of December 31, 2016, IC Power performed an impairment test for CDA and JPPC due to a reduction on average EBITDA projections higher than 15%. Based on the review of these two

CGUs, the recoverable amount was higher than the assets carrying value. Therefore, IC Power determined that there no impairment adjustments were required.

Impairment Test of HelioFocus

Kenon recorded an impairment charge in the amount of approximately $13 million in the year ended December 31, 2014 in respect of HelioFocus’ assets, as a result of HelioFocus’ board of

directors’ decision to reduce HelioFocus’ activities and maintain only a minimum number of personnel. This decision was made by HelioFocus’ board of directors in response to HelioFocus’ expectation
of insufficient financing during the 2015 fiscal year. HelioFocus’ assets have been written down to $0. HelioFocus is currently in a liquidation process.

Impairment Test of Qoros

Qoros’ management performed an impairment test of certain of Qoros’ assets (primarily its PP&E and intangible assets) as of December 31, 2016, based upon Qoros’ 2017 revised business

plan, which was adopted in March 2017. The impairment test was conducted with the assistance of a third party engaged by Qoros’ management. A discussion of the impairment test of Qoros’ assets as
of December 31, 2016, including its key assumptions, is set forth below.

For the purposes of IAS 36, Qoros, which develops, manufactures and distributes passenger vehicles, has one CGU, which consists of all of Qoros’ assets.

181

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros estimated its recoverable amount based upon the fair value of Qoros’ assets less the costs of disposal, using the discounted cash flow method. In developing the estimates of Qoros’ future

cash flows for the five years ending December 31, 2021, including terminal value, assumptions were made relating to future sales volume, including potential NEV sales and sale price, utilization
capacity of Qoros’ manufacturing facility, timing and nature of investments related to the expansion of Qoros’ manufacturing facility, timing for launch of new models, turnover days, inventory volumes,
operating expenses, capital expenditures, availability of funding, taxes, the discount rate (based on a WACC that is consistent with WACCs used by other development stage companies in Qoros’
industry), in each case over the course of the remaining five-year period upon which Qoros’ business plan is based, as well as the terminal growth rate for after the remaining five-year period.
Assumptions in respect of Qoros’ funding include assumptions related to Qoros’ receipt of certain subsidies from local Chinese governments.

Qoros concluded that the recoverable amount of its CGU was higher than the carrying amount of its CGU, based upon the mid-point of the analysis. Therefore, no impairment was recognized in

Qoros’ December 31, 2016 financial statements in respect of its CGU.

In conducting the impairment test, Qoros made a number of key assumptions which were based upon the assumptions outlined in Qoros’ updated business plan for the next five years, including
a significant increase in the volumes of cars manufactured and sold by Qoros from current levels. Qoros also assumed sufficient funding being available to it, either from its shareholders or other lenders.

Although Qoros believes the assumptions used to evaluate the potential impairment of its assets are reasonable and appropriate, such assumptions are subjective. There can be no assurance as to

future levels of cars produced or sold by Qoros, the availability of funding and the development of Qoros’ distribution and dealer network.

The analysis for the impairment test is sensitive to variances in each of the assumptions used and if the assumptions used by Qoros to evaluate the potential impairment of its assets proves
incorrect, Qoros may recognize significant impairment charges in its financial statements in the future. Qoros’ management has determined that the forecasted volume of sales is the most important
element of Qoros’ business plan and accordingly is the most sensitive key assumption for which there reasonably could be a possible change that could cause the carrying amount of Qoros’ CGU to
exceed the recoverable amount.

Impairment Tests of ZIM

In connection with the completion of ZIM’s restructuring in July 2014, IC’s equity interest in ZIM (which was transferred to Kenon in connection with Kenon’s spin-off from IC) was reduced

to 32%. As a result of conditions in the container shipping market, Kenon conducted an impairment test in relation to its 32% equity investment in ZIM as of June 30, 2016 in accordance with IAS 28
and IAS 36. Kenon concluded that as of June 30, 2016, the carrying amount of its investment in ZIM was higher than the recoverable amount, and therefore, Kenon recognized an impairment loss of $72
million with respect to its investment in ZIM in 2016. After the impairment and as of December 31, 2016, the carrying amount of Kenon’s 32% equity investment in ZIM is $82 million.

Following the decline in industry profitability during the first half of 2016, peer company multiple movements did not exhibit consistent trends. Thus, more varied range of valuation scenarios

and assumptions were considered to value Kenon's interest in ZIM as of June 30, 2016, including:

· margins based on average industry margins, discounted by approximately 30% to reflect ZIM's smaller size and operating model relative to its peers;

·

·

·

peer market capitalization movements since December 2015;

an EBITDA multiple range of 10.5x to 11.5x to the normalized EBITDA of $42 million; and

growth in freight rates of 7.1%.

Kenon did not subsequently conduct an impairment test in relation to its interest in ZIM as of December 31, 2016, as there were no indicators of further impairment as of this date.

In 2015, Kenon performed a valuation of its interest in ZIM as of December 31, 2015. Kenon concluded that, as of December 31, 2015, the recoverable amount of its investment in ZIM

exceeded the carrying amount and, therefore, Kenon did not recognize an impairment in its financial statements in respect of its investment in ZIM.

ZIM conducted an impairment test of its operating assets as of December 31, 2016. For the purposes of IAS 36, ZIM, which operates integrated network liner activity, has one CGU, which

consists of all of ZIM’s operating assets. ZIM estimated its recoverable amount based upon the fair value of its CGU less the costs of disposal, using the discounted cash flow method.

182

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ZIM’s assumptions were made for the period up to December 31, 2020 and a representative year intended to reflect a long-term, steady state. The key assumptions are set forth below:

· A detailed cash flow forecast for the above-mentioned period based upon ZIM’s business plan;

·

·

·

·

Bunker price : according to the future price curve of fuel;

Freight rates : a compound annual growth rate of 1.4% over the projection period;

Increase in aggregate TEU shipped : a compound annual growth rate of 3.0% over the projection period, which is in line with the expected trends in the main trade zones in which ZIM
intends to operate;

Charter hire rates : contractual rates in effect as of June 30, 2016, and assuming anticipated market rates for renewals of charters expiring in the projection period;

· Discount rate of 9.5%;

·

·

·

Long-term nominal growth rate of 1.5%, which is consistent with the expected industry average;

Capital expenditures that are less than or equal to ZIM’s expected vessel depreciation; and

Payment of tax at ZIM’s corporate tax rate of 25%; also assumes expected use of tax losses.

ZIM concluded that the recoverable amount of its CGU was higher than the carrying amount of the CGU, and therefore, no impairment was recognized in ZIM’s financial statements in respect

of its CGU.

Although ZIM believes the assumptions used to evaluate the potential impairment of its assets are reasonable and appropriate, such assumptions are highly subjective. There can be no assurance

as to how long bunker prices and freight rates will remain consistent with their current levels or whether they will increase or decrease by any significant degree. Freight rates may remain at depressed
levels for some time, which could adversely affect ZIM’s revenue and profitability. For further information on recent trends relating to bunker prices and freight rates, see “ —Trend Information—ZIM .”

A change of 100 bps in the following assumptions will result in an increase (decrease) in the fair value of the recoverable amount as follows:

Discount rate  
Terminal growth rate   

Business Combinations

Increase

Decrease

By 100 bps
(US$ million)
(130)  
106 

164 
(83)

Kenon accounts for all business combinations using the acquisition method when control is transferred to Kenon and its subsidiaries and associated companies. The consideration transferred in

the acquisition is measured at the fair value, as are the identifiable net assets acquired. Kenon controls an entity when it is exposed to, or has rights to, variable returns from its involvement with the
acquired entity and it has the ability to affect those returns based on its power over those acquired entities.

Kenon recognizes goodwill on acquisitions according to the fair value of consideration transferred, less the net amount of the fair value of identifiable assets acquired, less the fair value of

liabilities assumed. To the extent there is negative goodwill in connection with an acquisition, Kenon recognizes the resulting in gain in profit or loss on the acquisition date.

Costs incurred in connection with the acquisition of a business, including finder’s, advisory, legal valuation and other professional or consulting fees, are expensed in the period the services are

received.

Adoption of New Accounting Standards in 2018 and 2019

Applicable for annual periods beginning on or after January 1, 2018, IFRS 15 “Revenues from Contracts with Customers” will replace the current guidelines regarding recognition of revenue
from contracts with customers. IFRS 15 provides two approaches for recognition of revenue, and includes five stages for analysis of transactions in order to determine the timing of recognition of the
revenue and the amount thereof. As of the date of this annual report , we have not yet adopted IFRS 15.

183

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
As of December 31, 2016, we are unable to determine the standard’s quantitative effects on our business.

IFRS 15 is expected to have certain qualitative effects on our business, particularly with respect to IC Power. For example, IFRS 15 is expected to have a qualitative effect on the identification

and modification of contracts, performance obligations, transaction prices and allocation of such prices, recognition of revenue and disclosures.

In addition, IFRS 16 “Leases” will replace IAS 17 – Leases and its related interpretation effective for annual periods commencing on or after January 1, 2019, with the possibility of early

adoption. Kenon’s assessment of the impact of future implementation of IFRS 16 is ongoing.

In addition, IFRS 9 (2014) “ Financial Instruments ” will replace IAS 39 Financial Instruments: Recognition and Measurement regarding, among others, the classification and measurement of

financial instruments, a new expected credit loss model for calculating impairment on financial assets, and new general hedge accounting requirements. The standard will be applied for annual periods on
or after January 1, 2018, with the possibility of early adoption. As of December 31, 2016, Kenon is not able to determine the quantitative impact of application of IFRS 9.

For more information on the impact of the adoption of these standards, see Note 3 to our consolidated financial statements.

Recent Developments

Kenon

In March 2017, Kenon agreed to fund shareholder loans of up to RMB777 million to Qoros in two equal tranches in connection with the full release of its remaining RMB850 million back-to-

back guarantee obligations (plus related interest and fees) to Chery. The first tranche of loans were provided to Qoros in March 2017 in the amount of RMB388.5 million, reducing Kenon’s back-to-back
guarantee obligations to Chery by RMB425 million. As part of the RMB388.5 million first tranche loans to Qoros, Kenon funded 50% of this amount on behalf of Chery in connection with 50% of the
RMB425 million guarantee reduction discussed above and 50% of this amount on behalf of Kenon.

Should Kenon provide the second tranche of loans, such loans are expected to be made on substantially similar terms to the first tranche loans. Kenon’s remaining back-to-back guarantee

obligations to Chery will be fully released upon its provision of the second tranche loans. For further information on Kenon’s March 2017 agreement to fully release its guarantee obligations, see “—
Qoros’ Liquidity and Capital Resources—Material Indebtedness—March 2017 Shareholder Loans .”

IC Power

Agreement with respect to Interests in Colombian Assets

In March 2017, IC Power’s subsidiary Samay III S.A. and Surpetroil’s minority shareholder Mr. Yesid Gasca Duran entered into an agreement pursuant to which the parties stated that they

would no longer proceed with jointly developing the Surpetroil assets and would divide the assets between them. The transaction is subject to the satisfaction of closing conditions which must be
satisfied within 90 days of the agreement.

As a result of this agreement, IC Power conducted an impairment analysis in the first quarter of 2017 and determined that the book value of Samay III S.A.’s Colombian assets exceeds the

recoverable amount. As such, IC Power is expected to record a $14 million impairment charge in the first quarter of 2017.

Acquisition of Rights to Construct a 396 MW Power Station in Israel

In April 2017, IC Power entered into an agreement to acquire 95% of the shares of Zomet Energy Ltd., or Zomet, from Ipswich Holdings Netherlands B.V. and Rapac Energy Ltd. Zomet holds

the rights to develop a natural gas-fired power station at Plugot Junction, Israel of approximately 396 MW, in addition to land rights and statutory approvals. Completion of the transaction is subject to
the fulfillment of certain conditions, including receipt of various regulatory approvals.

The project has been approved as a national infrastructure project by the Israeli government and the National Infrastructure Committee of Israel. The natural gas power plant is expected to

produce electricity using open-cycle technology, and is expected to serve as a peaking unit. The project is expected to be funded through a combination of equity and project finance debt.

184

 
 
 
 
 
 
 
 
 
 
 
 
Fire at Kanan Plant

In April 2017, the Kanan power plant, which consists of a 37 MW barge and a 55 MW barge, experienced a fire. As a result of the fire, Kanan’s 37 MW barge experienced significant damage

and has been placed off-line. Kanan’s 55 MW barge has also been placed off-line. The full extent of the damages to the barges is still being assessed.

IC Power has insurance for its Kanan power plant, and intends to seek coverage for the costs of the outage, including repair costs and loss of profits, as appropriate, from insurance coverage

(subject to deductibles).

IC Power is assessing various options to resume the Kanan power plant’s operations.

Entry by DEORSA and DEOCSA into Loan Agreements

In April 2017, DEORSA and DEOCSA entered into loan agreements with Banco Industrial, S.A. for total borrowings of up to approximately 1.1 billion Guatemalan Quetzales. The loans have

not yet been disbursed, and such disbursement is subject to various conditions, including the refinancing of certain indebtedness.

Qoros

Agreement with Yibin to Jointly Establish NEV Manufacturing Base

In April 2017, Qoros, Chery, Yibin Municipal Government, or Yibin, and Quantum entered into a strategic cooperation agreement. In addition, Chery, Yibin (through its investment platform
company), Quantum, and Qoros have signed an investment agreement that provides for joining Yibin as a strategic partner with Qoros and for a collaboration on conventional and new energy vehicle
projects in Yibin, Sichuan Province, subject to certain conditions.

According to the agreements, Yibin, through its investment platform company, will establish with Qoros an NEV and conventional vehicle manufacturing base in Yibin.

Yibin may make significant investments in Qoros upon government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other

agreements. Such further investment, if provided, is expected to dilute Quantum's and Chery's interests in Qoros. For further information on the risks related to such investment and potential dilution of
Kenon’s interest in Qoros, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is a joint venture in which our interest is only 50% .”

A.   

 Operating Results

Our consolidated/combined financial statements for the years ended December 31, 2016, 2015 and 2014 are comprised of IC Power, Primus, HelioFocus, and the results of the associated

companies (Qoros, ZIM and Tower).

As set forth above, as a result of the completion of ZIM’s restructuring in July 2014, IC’s equity investment in ZIM was reduced from 99.7% to 32% and ZIM is reflected as a discontinued

operation for all periods prior to June 30, 2014. ZIM’s results of operations for the six month period ended December 31, 2014, and all periods subsequent thereto, are reflected in our share in losses of
associated companies, net of tax for the relevant period. Additionally, Tower’s results of operations for all periods prior to June 30, 2015 were accounted for pursuant to the equity method of accounting
and were reflected in our share in losses of associated companies, net of tax. As a result of our distribution in specie of substantially all of our interest in Tower on July 23, 2015, Tower’s results of
operations for all periods subsequent to June 30, 2015 are not reflected in our consolidated/combined financial statements. Finally, as a result of the completion of the sale of Petrotec in December 2014,
Petrotec is reflected as a discontinued operation in our results of operations for the year ended December 31, 2014.

Our consolidated/combined results of operations for each of the periods presented are largely impacted by IC Power, which generated net income of $21 million, $53 million, and $256 million

for the years ended December 31, 2016, 2015 and 2014, respectively.

IC Power uses the following segments in its consolidated financial statements: Peru, Israel, Central America (which consists of Nicaragua, Guatemala, El Salvador and Panama) and Other

(which consists of Bolivia, Chile, the Dominican Republic, Jamaica, Colombia, IC Power’s associated company Pedregal and certain IC Power intermediate holding companies). These are not segments
in Kenon’s consolidated financial statements (IC Power was a segment within Kenon’s consolidated financial statements for periods up to the year ended December 31, 2015). Kenon's segments for the
periods after December 31, 2015 include IC Power (Generation) and IC Power (Distribution), as a result of Kenon’s acquisition of its distribution business in January 2016. The discussion of IC Power’s
sales, cost of sales and financing expenses (net) below is based on IC Powers’ segments.

185

 
 
 
 
 
 
 
 
 
 
 
  
  
 
 
 
 
 
Year Ended December 31, 2016 Compared to Year Ended December 31, 2015

Set forth below are our consolidated statements of statements of profit and loss information for the years ended December 31, 2016 and 2015:

Revenues from sale of electricity  

Cost of sales and services   
Depreciation  

Gross profit   

Selling, general and administrative expenses   
Gain from disposal of investees  
Impairment of assets and investments  
Dilution gains from reduction in equity interest held in associate
Gain on bargain purchase   
Other expenses  
Other income  
Gain from distribution of dividend in kind  

Operating profit  

Financing expenses   
Financing income   

Financing expenses, net  

Share in losses of associated companies, net of tax  
Provision of financial guarantee   

Profit before income taxes   

Tax expenses   

Net Profit for the year
Attributable to:  

Kenon’s shareholders:   
Non-controlling interests   

*   

 Indicates that the percentage change is not meaningful.

186

Year Ended December 31,
(in millions of USD)

2016

2015

% Change

  $

  $

  $

  $

  $

  $

  $
  $

  $

1,874 
(1,359)  
(160)  

  $

355 
(147)  
— 
(72)  
— 
— 
(5)  
21 
— 

  $

152 
(190)  
19 

(171)   $
(186)  
(130)  

(335)   $
(59)  

(394)   $

(412)   $
  $
18 

1,289 
(863)  
(111)  

315 
(104)  
— 
(7)  
33 
— 
(7)  
15 
210 

456 
(124)  
13 

(111)  
(187)  
— 

158 
(62)  

96 

73 
23 

45%
57%
44%

13%
41%
* 
* 
* 
* 
(29)%
40%
* 

(67)%
53%
46%

54%
1%
* 

* 
(5)%

* 

* 
(22)%

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
The following tables set forth summary information regarding our operating segment results for the years ended December 31, 2016 and 2015.

IC Power
Generation

IC Power
Distribution

Year Ended December 31, 2016

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

  $

  $

  $

  $

  $

Sales 
Depreciation and amortization 
Impairment of assets and investments 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Provision of financial guarantee 
Income (loss) before taxes 
Income taxes 
Income (loss) from continuing operations 

Attributable to:

Kenon’s shareholders 
Non-controlling interests 

Segment assets 4 
Investments in associated companies 
Segment liabilities 
Capital expenditure 7 

Adjusted EBITDA 
Percentage of consolidated revenues 
Percentage of consolidated assets 
Percentage of consolidated assets excluding

associated companies

Percentage of consolidated Adjusted EBITDA
___________________

  $

1,365 
(157)  
— 
10 
(166)  
1 
— 
31 
(45)  
(14)   $

  $

  $

509 
(15)  
— 
4 
(19)  
— 
— 
47 
(12)  
35 

  $

  $

  $

(29)  
15 
4,217 
8 
3,462 
262 
3438    $
73% 
82% 

86% 
87% 

  $

32 
3 
600 
— 
542 
28 
779    $
27% 
12% 

12% 
19% 

  $

— 
— 
— 
— 
— 
(143)  
— 

(143)   $

— 

(143)   $

  $

(143)  
— 
— 
118 
— 
— 

  $

— 
—% 
2% 

—% 
—% 

— 
— 
(72)
17 
(17)
(44)
(130)
(270)
(2)
(272)

  $

  $

  $

  $

(272)
— 
1135  
82 
2406  
— 
(24) 10  $
—%  
4%  

2%  
(6)%  

  $

— 
— 
— 
(12)  
12 
— 
— 
— 
— 
— 

  $

  $

  $

— 
— 
— 
— 
— 
— 

  $

— 
—% 
—% 

—% 
—% 

1,874 
(172)
(72)
19 
(190)
(186)
(130)
(335)
(59)
(394)

(412)
18 
4,930 
208 
4,244 
290 

396 
100%
100%

100%
100%

Includes the results of Primus and HelioFocus; the results of ZIM, as an associated company; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment financing income and expenses.

1. Associated company.
2.
3.
4. Excludes investments in associates.
5.
6.
7.
8. For a reconciliation of IC Power Generation’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2016, see “ Item 3.A Selected

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

Financial Data .”

9. For a reconciliation of IC Power Distribution’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2016, see “ Item 3.A Selected

Financial Data .”

10. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

187

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31, 2015

IC Power

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

Sales 
Depreciation and amortization
Asset impairment
Financing income
Financing expenses
Share in (losses) income of associated companies
Gain from distribution of dividend in kind
Income (loss) before taxes
Income taxes 
Income (loss) from continuing operations

Attributable to:

Kenon’s shareholders
Non-controlling interests

Segment assets 5 
Investments in associated companies
Segment liabilities
Capital expenditure 8

Adjusted EBITDA
Percentage of consolidated revenues
Percentage of consolidated assets
Percentage of consolidated assets excluding associated companies
Percentage of consolidated Adjusted EBITDA
___________________

  $

  $

  $

  $

  $

  $

  $

  $

  $

1,294 
(119)
— 
10 
(115)
— 
— 
149 
(62)
874  

63 
24 
4,069 
9 
3,063 
533 

3724,9    $
100%  
91%  
99%  
100%  

  $

— 
— 
— 
— 
— 
(196)  
— 

(196)   $

— 

(196)   $

  $

(196)  
— 
— 
159 
— 
— 

  $

— 
— 
4% 
— 
— 

— 
(1)
(7)
3 
(9)
9 
210 
205 
— 
205 

  $

  $

  $

206 
(1)
456     $
201 
1567    
— 

110    $
— 
5%  
1%  
— 

(5)   $
— 
— 
— 
— 
— 
— 
— 
— 
— 

  $

  $

  $

  $

— 
— 
— 
— 
— 
— 

— 
— 
— 
— 
— 

1,289 
(120)
(7)
13 
(124)
(187)
210 
158 
(62)
96 

73 
23 
4,114 
369 
3,219 
533 

373 
100%
100%
100%
100%

1. Associated company.
2.

3.
4.

Includes the results of Primus and HelioFocus; the results of ZIM and Tower (up to June 30, 2015), as associated companies; as well as Kenon’s and IC Green’s holding company and general and
administrative expenses.
“Adjustments” includes inter-segment sales.
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

5. Excludes investments in associates.
6.
7.
8.
9. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, see “ Item 3.A Selected Financial Data

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

.”

10. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

188

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth summary information regarding the results of operations of our equity-method businesses for the periods presented:

Revenues

Income/(Loss) 
Other comprehensive income/(loss)

Total comprehensive income/(loss)

Share of Kenon in total comprehensive income/(loss)

Adjustments 

Share of Kenon in total comprehensive income/(loss) presented

in the books

Total assets 
Total liabilities 
Book value of investment 
______________________

  $

  $

  $

  $

  $

Year Ended
December 31,
2016

ZIM

Qoros

2,539    $
(168)    
(13)    

ZIM
(in millions of USD)

377    $
(285)    
—     

2,991    $
2     
(2)    

Year Ended
December 31,
2015
Qoros

Tower 1

232    $
(392)    
—     

(181)   $

(285)   $

—    $

(392)   $

(57)   $
14     

(143)   $
—     

—    $
10     

(196)   $
—     

(48)   $

(143)   $

10    $

(196)   $

1,704    $
1,804     
82     

1,534    $
1,469     
118     

1,912    $
1,834     
201     

1,665    $
1,635     
159     

462 
(1)
— 

(1)

— 
(1)

(1)

— 
— 
— 

1. Reflects Tower’s results of operations up to June 30, 2015. As a result of our distribution in specie of substantially all of our interest in Tower, representing 23% of the then currently outstanding

Tower shares on July 23, 2015, Tower’s results of operations for all periods subsequent to June 30, 2015 are not reflected in our consolidated financial statements.

Revenues

Our revenues increased by $585 million, or 45%, to $1,874 million for the year ended December 31, 2016 from $1,289 million for the year ended December 31, 2015. As discussed in further

detail below, this increase was primarily driven by IC Power’s acquisition of its distribution business in January 2016 which, from the date of its consolidation on January 22, 2016, contributed $509
million to our revenues in the year ended December 31, 2016.

Generation Business

Our revenues from IC Power’s generation business (including the Other segment, but excluding eliminations) increased to $1,365 million for the year ended December 31, 2016 from $1,289

million for the year ended December 31, 2015, as discussed in further detail below:

Peru Segment

Sales from IC Power’s Peru segment increased by $80 million, or 18%, to $528 million for the year ended December 31, 2016 from $448 million for the year ended December 31, 2015,

primarily as a result of:

·

·

a $50 million contribution to revenues in 2016 from CDA, which reached COD in August 2016; and

a $40 million contribution to revenues in 2016 from Samay I, which reached COD in May 2016.

These effects were partially offset by a $10 million, or 2%, decrease in Kallpa’s revenue to $438 million in 2016 from $448 million in 2015, primarily as a result of a $12 million, or 4%,
decrease in revenue resulting from a $2, or 4%, decrease in Kallpa’s average energy price to $43 per MWh in 2016 from $45 per MWh in 2015. The decrease in average energy price was principally due
to the current oversupply of capacity in the Peruvian power market.

Israel Segment

Sales from IC Power’s Israel segment increased by $30 million, or 9%, to $356 million for the year ended December 31, 2016 from $326 million for the year ended December 31, 2015,
primarily as a result of a $37 million increase in OPC-Hadera’s contribution to revenues to $45 million in 2016 from $8 million in 2015 (from the date of our acquisition of OPC-Hadera in August 2015).

189

 
 
   
 
 
 
   
 
 
 
   
   
   
   
 
 
 
 
 
   
   
 
   
      
      
      
      
  
 
   
      
      
      
      
  
 
   
 
   
      
      
      
      
  
 
   
      
      
      
      
  
 
 
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The increase in revenues in the Israel segment was partially offset by a $7 million, or 2%, decrease in OPC-Rotem’s revenue to $311 million during the year ended December 21, 2016 from

$318 million for the year ended December 31, 2015, as a result of declines in the EA generation component tariff in August 2015 (which tariff forms the basis for the prices in OPC-Rotem’s PPAs). The
decrease in OPC-Rotem’s revenues in 2016 was offset by an $8 million contribution to revenues in 2016 from OPC-Rotem’s sale of excess natural gas during the period (which OPC-Rotem sold as a
result of scheduled maintenance occurring at its plant in Q2 2016).

Central America Segment

Sales from IC Power’s Central America segment declined by $11 million, or 3%, to $326 million for the year ended December 31, 2016 from $337 million for the year ended December 31,

2015, primarily as a result of:

·

·

·

a $54 million, or 50%, reduction in Puerto Quetzal’s revenue to $55 million in 2016 from $109 million in 2015 as a result of a $44 million decrease in Puerto Quetzal’s revenue from
energy sales to $41 million in 2016 from $85 million in 2015 due to (1) the expiration of a short-term PPA and a 50% decrease in spot market sales, which led to a 26% decrease in the
total volume of energy sold by Puerto Quetzal to 713 GWh in 2016 from 962 GWh in 2015 and (2) a $30, or 34%, decrease in Puerto Quetzal’s average energy price to $58 per MWh in
2016 from $88 per MWh in 2015 due to adjustments in PPAs and a reduction in spot market energy prices, in each case as a result of a decrease in HFO prices;

a $21 million, or 19%, reduction in ICPNH’s revenue to $90 million in 2016 from $111 million in 2015, as a result of (1) a $12 million, or 19%, decrease in ICPNH’s revenue from
energy sales from its thermal plants (Corinto and Tipitapa Power) to $52 million in 2016 from $64 million in 2015, primarily as a result of an $11, or 14%, decrease in the average
energy prices of the thermal plants to $67 per MWh in 2016 from $78 per MWh in 2015 due to adjustments in PPAs as a result of a decrease in HFO prices (which reduced the energy
sales of the thermal plants by $8 million), and a 6% decrease in the total volume of energy sold by the thermal plants to 771 GWh in 2016 from 820 GWh in 2015, primarily as a result
of the breakdown of one of Corinto’s engines in March 2016; and (2) a $7 million, or 23%, decrease in ICPNH’s revenue from energy sales from its wind farms (Amayo I and Amayo
II) to $23 million in 2016 from $30 million in 2015, due to lower generation as a result of lower wind levels.

a $17 million, or 17%, reduction in Nejapa’s revenue to $83 million in 2016 from $100 million in 2015, as a result of a decrease in Nejapa’s average energy price to $83 per MWh in
2016 from $102 per MWh in 2015 due to adjustments in PPAs and a reduction in spot market energy prices as a result of a decrease in HFO prices.

These decreases were partially offset by:

·

·

·

a $67 million contribution in revenues in 2016 from Kanan, which commenced commercial operations in April 2016;

a $7 million, or 41%, increase in Cenérgica’s revenue to $24 million in 2016 from $17 million in 2015, primarily as a result of a $7 million increase in Cenérgica’s revenue from energy
trading to $13 million in 2016 from $6 million in 2015; and

a $7 million contribution in revenues from Guatemel, which was acquired in January 2016.

Other Segment

Sales from IC Power’s Other segment decreased by $23 million, or 13%, to $155 million for the year ended December 31, 2016 from $178 million for the year ended December 31, 2015,

primarily as a result of the following:

·

·

a $10 million, or 26%, decrease in CEPP’s revenue to $29 million in 2016 from $39 million in 2015, primarily as a result of a $43, or 40%, decrease in CEPP’s average energy price to
$64 per MWh in 2016 from $107 per MWh in 2015, due to a reduction in spot market energy prices as a result of a decrease in HFO prices. The effects of the decrease in CEPP’s
average energy price were partially offset by a $6 million, or 19%, increase in revenue as a result of a 55 GWh, or 19%, increase in the volume of energy sold by CEPP to 346 GWh in
2016 from 291 GWh in 2015, as a result of sales under a short term PPA signed in April 2016;

a $7 million, or 25%, decrease in Colmito’s revenue to $21 million in 2016 from $28 million in 2015, primarily as a result of a $24, or 28%, decrease in Colmito’s average energy price
to $61 per MWh in 2016 from $85 per MWh in 2015, due to higher hydrology levels during 2016, which reduced spot market energy prices (as the price in Colmito’s PPA is linked to
spot market energy prices), and a 7% decrease in the volume of energy sold by Colmito to 263 GWh in 2016 from 281 GWh in 2015 (which reduced Colmito’s revenue from energy
sales by $2 million);

190

 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

a $3 million, or 7%, decrease in JPPC’s revenue to $42 million in 2016 from $45 million in 2015, primarily as a result of a $10, or 12%, decrease in JPPC’s average energy price to $72
per MWh in 2016 from $82 per MWh in 2015 due to adjustments in PPAs as a result of a decrease in HFO prices; and

a $3 million, or 7%, decrease in COBEE’s revenue to $40 million in 2016 from $43 million in 2015, primarily as a result of a 17% decrease in the volume of energy sold by COBEE to
861 GWh in 2016 from 1,039 GWh in 2015, primarily due to lower hydrology levels during 2016.

Distribution Business

Sales from IC Power’s distribution business were $509 million during the period from January 22, 2016 (the date of IC Power’s acquisition and consolidation of its distribution business) to

December 31, 2016.

Cost of Sales and Services (excluding Depreciation and Amortization)

Our cost of sales (excluding depreciation and amortization) increased by $450 million, or 50%, to $1,359 million for the year ended December 31, 2016 from $909 million for the year ended

December 31, 2015. As discussed in further detail below, this increase was primarily driven by IC Power’s acquisition of its distribution business in January 2016 which, from the date of its
consolidation on January 22, 2016, contributed $403 million to our cost of sales (excluding depreciation and amortization) in 2016.

Generation Business

Our cost of sales (excluding depreciation and amortization) from IC Power’s generation business (including the Other segment, but excluding eliminations) were $958 million for the year ended

December 31, 2016, as compared to $909 million for the year ended December 31, 2015, as discussed in further detail below:

Peru Segment

Cost of sales (excluding depreciation and amortization) from IC Power’s Peru segment increased by $44 million, or 16%, to $323 million for the year ended December 31, 2016 from $279

million for the year ended December 31, 2015, primarily as a result of the following:

·

·

·

a $30 million contribution in cost of sales from Samay I and CDA ($16 million and $14 million, respectively), which commenced commercial operations in May 2016 and August 2016,
respectively;

a $22 million, or 16%, increase in Kallpa’s gas supply, transportation and distribution costs to $156 million in 2016 from $134 million in 2015 as a result of a 14% increase in the
volume of gas consumption due to a 16% increase in the volume of Kallpa’s energy generation to 6,015 GWh in 2016 from 5,166 GWh in 2015, which was partially offset by a 3%
increase in the price of gas in 2016; and

a $9 million, or 10%, increase in Kallpa’s transmission charges to $95 million in 2016 from $86 million in 2015, as a result of a 19% increase in the primary toll system tariff in 2016 as
compared to 2015.

These effects were partially offset by:

·

·

a $10 million decrease in energy purchases as a result of the higher volume of energy generated by Kallpa as discussed above; and

a $6 million decrease in maintenance expenses, as a result of scheduled major maintenance and inspection work conducted at Kallpa during 2015.

Israel Segment

Cost of sales (excluding depreciation and amortization) from IC Power’s Israel segment increased by $40 million, or 17%, to $282 million for the year ended December 31, 2016, as compared

to $242 million for the year ended December 31, 2015, primarily as a result of:

·

·

a $36 million increase in the cost of sales of OPC-Hadera, which was acquired in August 2015; and

a $6 million, or 82%, increase in OPC-Rotem’s energy purchase costs as a result of a 124% increase in the volume of energy purchased to 486 GWh in 2016 from 217 GWh in 2015,
due to scheduled maintenance performed at OPC-Rotem in Q2 2016.

191

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
These effects were partially offset by an $8 million, or 6%, decrease in OPC-Rotem’s fuel expense due to:

·

·

an 8% decrease in the volume of energy generated by OPC-Rotem to 3,487 GWh in 2016 from 3,811 GWh in 2015, as a result of the maintenance performed at OPC-Rotem in Q2 2016;
and

a 6% decrease in the price of natural gas purchased by OPC-Rotem. The prices OPC-Rotem pays for natural gas under its gas supply agreement are indexed to the EA generation
component tariff, subject to a floor price. Therefore, as a result of the August 2015 reduction in the EA generation component tariff, OPC-Rotem’s natural gas prices were lower in 2016
as compared to 2015.

Central America Segment

Cost of sales (excluding depreciation and amortization) from IC Power’s Central America segment declined by $13 million, or 5%, to $252 million for the year ended December 31, 2016, as

compared to $265 million for the year ended December 31, 2015, primarily as a result of the following:

·

·

·

a $42 million decrease in Puerto Quetzal’s cost of sales from $94 million in 2015 to $52 million in 2016 primarily due to (1) a $30 million decrease in Puerto Quetzal’s fuel expense as a
result of a 38% decrease in the price of HFO purchased by Puerto Quetzal and a 46% decrease in the volume of energy generated by Puerto Quetzal to 364 GWh in 2016 from 673 GWh
in 2015; and (2) a $12 million decrease in Puerto Quetzal’s energy purchase costs (despite a 14% increase in the volume of energy purchased) as a result of a $24, or 26%, decrease in
spot purchase prices to $67 per MWh in 2016 from $91 per MWh during 2015;

an $18 million decrease in Nejapa’s cost of sales from $85 million in 2015 to $67 million in 2016 due to (1) an $11 million decrease in Nejapa’s fuel expenses, primarily as a result of a
12% decrease in the volume of energy generated to 387 GWh in 2016 from 440 GWh in 2015, and a 23% decrease in the price of HFO purchased by Nejapa, and (2) a $3 million
decrease in Nejapa’s energy purchase costs as a result of a 25% decrease in spot purchase prices, which was partially offset by a 12% increase in the volume of energy purchased by
Nejapa to 461 GWh in 2016 from 411 GWh in 2015, as a result of lower generation as Nejapa purchased more energy in the spot market (instead of generating such energy) in light of
the low spot prices; and

a $14 million decrease in ICPNH’s cost of sales due to a $16 million decrease in Corinto and Tipitapa’s fuel expenses, as a result of a 21% decrease in the price of HFO.

These effects were partially offset by:

·

·

$55 million contribution to cost of sales in 2016 from Kanan, which commenced commercial operations in April 2016; and

a $4 million contribution to cost of sales in 2016 from Guatemel, which was acquired in January 2016.

Other Segment

Cost of sales (excluding depreciation and amortization) from IC Power’s generation business’ Other segment declined by $24 million, or 18%, to $99 million for the year ended December 31,

2016, as compared to $123 million for the year ended December 31, 2015, primarily as a result of the following:

·

·

·

an $8 million decrease in Colmito’s cost of sales, primarily due to (1) a $4 million decrease in Colmito’s energy purchases, as a result of a 33% decrease in the spot market energy price
during 2016 as compared to 2015, driven by an increase in hydrology levels in Chile during 2016; and (2) a $2 million decrease in Colmito’s fuel expenses, mainly as a result of a 69%
decrease in the volume of energy generated by Colmito;

a $7 million decrease in CEPP’s cost of sales, primarily as a result of a $9 million decrease in CEPP’s fuel expenses, as a result of a 30% decrease in the price of HFO purchased by
CEPP, and a 12% decrease in the volume of energy generated by CEPP; and

a $6 million decrease in JPPC’s cost of sales, mainly due to a $7 million decrease in JPPC’s fuel expenses, as a result of a 17% decrease in the price of HFO purchased by JPPC, and an
8% decrease in the volume of energy generated by JPPC.

192

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Distribution Business

Cost of sales (excluding depreciation and amortization) from IC Power’s distribution business were $403 million from January 22, 2016 (the date of IC Power’s acquisition and consolidation of

its distribution business) to December 31, 2016.

Depreciation and Amortization

Our depreciation and amortization expenses (including the allocation of cost of sales and general, selling and administrative expenses) increased by $53 million, or 45%, to $172 million for the

year ended December 31, 2016 from $119 million for the year ended December 31, 2015, primarily as a result of:

·

·

·

·

an $18 million, or 86%, increase in depreciation and amortization expense in IC Power’s generation business’ Central America segment to $39 million in 2016 from $21 million in
2015, primarily as a result of the depreciation and amortization expenses of Kanan, which commenced commercial operations in April 2016;

the recognition of a $15 million depreciation and amortization expense in 2016, as a result of IC Power’s acquisition of its distribution business in January 2016;

a $10 million, or 20%, increase in depreciation and amortization expense in IC Power’s generation business’ Peru segment to $60 million in 2016 from $50 million in 2015, primarily as
a result of depreciation expenses associated with CDA and Samay I, which commenced commercial operations in August 2016 and May 2016, respectively; and

a $5 million, or 16%, increase in depreciation and amortization expense in IC Power’s generation business’ Other segment to $37 million in 2016, from $32 million in 2015, primarily as
a result of the depreciation and amortization of purchase price adjustments made in connection with IC Power’s acquisition of its distribution business in January 2016.

Selling, General and Administrative Expenses

Our selling, general and administrative expenses consist of payroll and related expenses, bad/doubtful debts, depreciation and amortization, and other expenses. Our selling, general and

administrative expenses (excluding depreciation and amortization) increased 41% to approximately $134 million for the year ended December 31, 2016, compared to $95 million for the year ended
December 31, 2015. This increase was primarily driven by the increase in IC Power’s selling, general and administrative expenses (as discussed below).

IC Power’s selling, general and administrative expenses (excluding depreciation and amortization) increased by $48 million, or 76%, to $111 million for the year ended December 31, 2016

from $63 million for the year ended December 31, 2015, primarily as a result of:

·

·

·

the recognition of $32 million in selling, general and administrative expenses in 2016, as a result of IC Power’s acquisition of its distribution business in January 2016;

a $9 million, or 35%, increase in IC Power’s Other segment’s selling, general and administrative expenses, primarily as a result of expenses incurred in connection with IC Power’s
withdrawn IPO, as well expenses incurred in connection with the IC Power reorganization in March 2016; and

a $5 million, or 28%, increase in IC Power’s Peru segment’s selling, general and administrative expenses, primarily as a result of Samay I and CDA’s respective commencements of
commercial operations in August 2016 and May 2016.

Gain from Distribution of Dividend in Kind

We did not recognize any gain from distribution of dividend in kind in 2016.

On July 23, 2015, we completed the pro rata distribution of substantially all of our interest in Tower. We recognized a $210 million gain in the year ended December 21, 2015, which reflects the

difference between the fair market value of the Tower ordinary shares held by us on the distribution date ($255 million based upon the closing price of the Tower shares on NASDAQ on the date of our
distribution of such shares to our shareholders by way of a capital reduction) and the carrying amount of Tower’s shares at the time of the distribution ($45 million).

Impairment of Assets and Investments

In 2016, Kenon recognized an impairment loss of $72 million with respect to its investment in ZIM in 2016. Kenon conducted the impairment test as a result of conditions in the container

shipping market during 2016.

193

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Our $7 million asset impairment in 2015 is due to IC Green writing-off its goodwill in Primus in the amount of $6 million.

For further information, see “ —Critical Accounting Policies and Significant Estimates—Impairment Analysis. ”

Other Income, Net

Our other income, net was $16 million for the year ended December 31, 2016 and consisted of:

·

·

·

a $7 million compensation payment received by Kallpa in connection with the early termination of a PPA in August 2016;

a $3 million payment from DEORSA’s and DEOCSA’s energy suppliers as compensation to DEORSA and DEOCSA for disruptions in their supplier’s provision of energy to DEORSA
and DEOCSA; and

a $3 million insurance payment received in 2016 relating to the Sainani power plant in Bolivia, as the plant was temporarily out of service from March 2014 until August 2015.

These effects were partially offset by the recording of a $3 million provision for contingencies.

Our other income, net for the year ended December 31, 2015 was $9 million and primarily consisted of a $7 million insurance payment received in 2015 relating to Amayo II’s claims in respect

of three wind turbines, which were damaged in December 2014 and $1 million received from an EPC contractor as a result of a delay in the COD of OPC-Rotem’s plant. This effect was partially offset
by the recording of a $4 million loss on sale of property, plant and equity, net.

Financing Expenses, Net

Our financing expenses, net, increased by $60 million, or 60%, to $171 million for the year ended December 31, 2016, compared to $111 million for the year ended December 31, 2015. This
increase was primarily driven by IC Power’s financing expenses, net, which increased by approximately $67 million, or 64%, to $171 million in 2016 from $104 million in 2015, as set forth in further
detail below.

Generation Business

Our financing expenses, net from IC Power’s generation business (including the Other segment, but excluding eliminations) increased by $52 million, or 50%, to $156 million for the year ended

December 31, 2016, compared to $104 million for the year ended December 31, 2015, as discussed in further detail below by segment.

Peru Segment

Financing expenses, net, from IC Power’s Peru segment increased by $21 million, or 50%, to $63 million in 2016 from $42 million in 2015, primarily as a result of (1) a $21 million increase in

finance expenses relating to CDA’s and Samay I’s respective syndicated facilities to $21 million in year ended December 31, 2016 from nil in 2015, as such interest expense was capitalized prior to
CDA’s and Samay I’s commencement of commercial operations in August 2016 and May 2016, respectively; and (2) Kallpa’s recognition of a $10 million expense resulting from the early redemption
premium paid in respect of a portion of the Kallpa bonds redeemed in May 2016.

These effects were partially offset by a $10 million positive change in foreign exchange rate net losses, as a result of the strengthening of the Peruvian Sol against the U.S. Dollar during 2016.

Israel Segment

Financing expenses, net, from IC Power’s Israel segment decreased by $7 million, or 30%, to $16 million for the year ended December 31, 2016 from $23 million for the year ended December

31, 2015, primarily as a result of an $8 million decrease in OPC-Rotem’s interest expense from parent company loans as a result of the repayment of the principal amount owed to IC Power Israel, or
ICPI (an intermediate holding company whose results are reflected in the Other segment).

Central America Segment

Financing expenses, net, from IC Power’s Central America segment increased by $2 million, or 20%, to $12 million for the year ended December 31, 2016 from $10 million for the year ended

December 31, 2015, primarily as a result of the $2 million interest expense recorded by Kanan, which commenced commercial operations in April 2016, in connection with Kanan’s $55 million credit
facility due 2021.

194

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Other Segment

Financing expenses, net, from IC Power’s Other segment increased by $36 million, or 124%, to $65 million for the year ended December 31, 2016 from $29 million for the year ended

December 31, 2015, primarily as a result of (1) a $12 million interest expense relating to the $220 million notes issued by IC Power to us in connection with the reorganization of IC Power in March
2016 (which expense is recorded as finance income at the Kenon level), (2) an $8 million interest expense relating to the $120 million ICPDH Credit Agreement entered into in connection with IC
Power’s acquisition of its distribution business, (3) an $8 million decrease in ICPI’s interest income related to the repayment of the outstanding principal amount of its intercompany loan with OPC-
Rotem and (4) a $7 million increase of finance expenses in Inkia related to the cessation of capitalization of finance expenses due the commencement of CDA’s commercial operations in 2016.

Distribution Business

Financing expenses, net, from IC Power’s distribution business were $15 million during the period from January 22, 2016 (the date of IC Power’s acquisition and consolidation of its

distribution business) to December 31, 2016.

Provision of Financial Guarantee

We recorded a provision of financial guarantee in the amount of $130 million in the year ended December 31, 2016. In light of Kenon’s strategy and Qoros’ limited liquidity as of June 30,

2016, Kenon increased its previously recorded liability of $30 million to $160 million in respect of Kenon’s back-to-back guarantee obligations to Chery. For further information on Kenon’s back-to-
back guarantee obligations to Chery, including Kenon’s agreement to fund shareholder loans to Qoros in connection with the full release of Kenon’s obligations under its back-to-back guarantees to
Chery, see “ Kenon’s Liquidity and Capital Resources—Kenon’s Commitments and Obligations—Back-to-Back Guarantees Provided to Chery .”

We did not record on our income statement a provision of financial guarantee for the year ended December 31, 2015.

Share In Income (Losses) of Associated Companies, Net of Tax

Our share in losses of associated companies, net of tax decreased by 1% to approximately $186 million for the year ended December 31, 2016, compared to approximately $187 million for the

year ended December 31, 2015. Set forth below is a discussion of income (losses) for our material associated companies and the share in income (losses) of associated companies, net of tax.

Qoros

Our share in Qoros’ comprehensive loss decreased to approximately $143 million for the year ended December 31, 2016, compared to losses of approximately $196 million for the year ended

December 31, 2015. As we have a 50% equity interest in Qoros, we recognize 50% of the net loss of Qoros in 2016 (RMB1,897 million) and 2015 (RMB2,475 million). A discussion of Qoros’ results of
operations (on a 100% basis; Kenon’s share is 50%) for 2016 and 2015 is set forth below. Qoros’ results of operation for 2016 and 2015 reflect the fact that Qoros is an early stage automobile
manufacturer. Accordingly, Qoros has incurred significant expenses, including expenses relating to the launch of new models, but has not achieved significant revenues.

Qoros’ revenues increased by 72% to RMB2,512 million in 2016, as compared to RMB1,459 million in 2015. Qoros’ increased revenues in 2016 reflect an approximately 70% increase in car

sales from approximately 14,000 cars in 2015 to approximately 24,000 cars in 2016. The launch of the Qoros 5 SUV in March 2016 was a major contributor to the increase in Qoros’ car sales.

Qoros’ cost of sales increased by 76% to RMB3,009 million in 2016, as compared to RMB1,713 million in 2015. The increase in cost of sales is primarily due to the increase in the number of

cars sold, as well as an increase in amortization of capitalized research and development costs and an increase in depreciation of property, plant and equipment.

Qoros’ cost of sales included depreciation and amortization of RMB659 million in 2016, as compared to RMB230 million in 2015.

Qoros’ gross loss increased by 96% to RMB497 million in 2016, as compared to RMB254 million in 2015.

Qoros’ selling, general and administrative expenses decreased by 51% to RMB763 million in 2016, as compared to RMB1,560 million in 2015. The decrease reflects cost-cutting measures

implemented by Qoros in 2016, including a reduction in advertising, marketing and promoting, consulting fees and personnel expenses.

195

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros’ net finance costs increased by 16% to RMB403 million in 2016, as compared to RMB346 million in 2015, primarily due to increased interest expenses.

As a result of the foregoing, Qoros’ loss decreased to RMB1.9 billion for the year ended December 31, 2016, as compared to RMB2.5 billion for the year ended December 31, 2015.

ZIM

Pursuant to the equity method of accounting, our share in ZIM’s results of operations was a loss of approximately $44 million and income of $10 million for the year ended December 31, 2016

and 2015, respectively. Set forth below is a summary of ZIM’s consolidated results for the year ended December 31, 2016 and 2015:

Sales   
Cost of sales   
Gross profit   
Operating profit (loss)   
Profit (loss) before taxes on income  
Taxes on income  
Profit (loss) after taxes on income  
Profit (loss) for the period   

Year Ended December 31,
2015
2016

(in millions of USD)

  $

2,539 
2,480 
59 
(52)  
(145)  
(18)  
(164)  
(164)   $

2,991 
2,775 
216 
98 
5 
2 
7 
7 

  $

  $

ZIM carried approximately 2,429 thousand TEUs in 2016, representing a 5% increase as compared to 2015, in which ZIM carried approximately 2,308 thousand TEUs. Despite the increase in
carried quantities in 2016, ZIM’s revenues decreased by 15% in 2016 to approximately $2.5 billion, as compared to approximately $3.0 billion in 2015, due to the decrease in industry container freight
rates. The reduction in revenues was partially offset by an 11% reduction in ZIM’s operating expenses and cost of services to approximately $2.4 billion in 2016, as compared to $2.7 billion in 2015,
primarily as a result of a decrease in bunker prices, as well as a decrease in charter hire expenses and cargo handling expenses, as a result of steps implemented by ZIM to manage its costs.

ZIM publishes its results on its website. For more information, see www.ZIM.com. This website, and any information referenced therein, is not incorporated by reference herein.

Tower

We did not record any comprehensive income for the year ended December 31, 2016 from Tower, as we completed the pro rata distribution of substantially all of our interest in Tower in 2015.

Our share in Tower’s comprehensive loss for the period in 2015 prior to June 30, 2015, during which period Kenon accounted for Tower’s results of operations pursuant to the equity method of

accounting, was approximately $1 million.

Tax Expenses

Our taxes on income decreased by $3 million, or 5%, to $59 million for the year ended December 31, 2016 from $62 million for the year ended December 31, 2015.

In 2016, we had a negative effective tax rate as we recorded a loss before taxes of $335 million before taxes for the year ended December 31, 2016. Our tax expenses for the year ended

December 31, 2016 are primarily due to IC Power’s income tax of $57 million for the year ended December 31, 2016.

Profit (Loss) For the Year

As a result of the above, our loss for the year amounted to $394 million for the year ended December 31, 2016, compared to a profit of $96 million for the year ended December 31, 2015.

196

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31, 2015 Compared to Year Ended December 31, 2014

Set forth below are our consolidated (for the year ended December 31, 2015) and combined carve-out (for the year ended December 31, 2014) statements of profit and loss information:

Revenues from sale of electricity  

Cost of sales and services   
Depreciation  

Gross profit   

Selling, general and administrative expenses   
Gain from disposal of investees  
Asset impairment  
Dilution gains from reduction in equity interest held in associate
Gain on bargain purchase   
Other expenses  
Other income  
Gain from distribution of dividend in kind  

Operating profit  

Financing expenses   
Financing income   

Financing expenses, net  

Share in losses of associated companies, net of tax  

Profit before income taxes   

Tax expenses   

Profit for the year from continuing operations  

Income for the year from discontinued operations (after taxes)

Net Profit for the year
Attributable to:  

Kenon’s shareholders:   
Non-controlling interests   

_____________________________

Year Ended December 31,
(in millions of USD)

2015

2014 1

% Change

  $

1,289 
(863)  
(111)  

1,372 
(981)  
(100)  

  $

315 
(104)  
— 
(7)  
33 
— 
(7)  
15 
210 

  $

456 
(124)  
13 

(111)   $
(187)  

  $

158 
(62)  

  $

96 
— 

96 

  $

73 
23 

  $
  $

291 
(131)  
157 
(48)  
— 
68 
(14)  
51 
— 

374 
(110)  
16 

(94)  
(171)  

109 
(103)  

6 
471 

477 

458 
19 

(6)%
12%
(11)%

8%
21%
* 
85%
* 
* 
(50)%
(70)%
* 

22%
(11)%
(19)%

(18)%
(9)%

45%
40%

* 
* 

(80)%

(85)%
21%

  $

  $

  $

  $

  $

  $

  $

  $
  $

1.

*

During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in IC Power.
Kenon’s and IC Power’s financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.
Indicates that the percentage change is not meaningful.

197

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
    
 
The following tables set forth summary information regarding our operating segment results for the years presented.

Sales 
Depreciation and amortization 
Asset impairment 
Financing income 
Financing expenses 
Share in (losses) income of associated companies
Gain from distribution of dividend in kind 

Income (loss) before taxes 
Income taxes 

Income (loss) from continuing operations 

Attributable to: 

Kenon’s shareholders  
Non-controlling interests   

Segment assets 5 
Investments in associated companies 
Segment liabilities 

Capital expenditure 8 

Adjusted EBITDA 
Percentage of consolidated revenues 
Percentage of consolidated assets 
Percentage of consolidated assets excluding associated companies
Percentage of consolidated Adjusted EBITDA
_____________________________ 
1. Associated company.
2.

Year Ended December 31, 2015

IC Power

Qoros 1

Other 2

Adjustments 3

(in millions of USD, unless otherwise indicated)

Consolidated
Results

  $

  $

  $

  $

  $

  $

1,294 
(119)
— 
11 
(115)
— 
— 

  $

149 
(62)

  $

— 
— 
— 
— 
— 
(196)  
— 

(196)   $

— 

  $

  $

— 
(1)
(7)
2 
(9)
9 
210 

205 
— 

874  

  $

(196)   $

205 

  $

  $

63 
24 
4,069 
9 
3,063 

533 

3724,9    $
100%  
91%  
99%  
100%  

(196)  
— 
— 
159 
— 

  $

— 

  $

— 
— 
4% 
— 
— 

206 
(1)
456     $
201 
1567    

— 

110    $
— 
5%  
1%  
— 

(5)   $
— 
— 
— 
— 
— 
— 

  $

— 
— 

— 

  $

  $

  $

— 
— 
— 
— 
— 

— 

— 
— 
— 
— 
— 

1,289 
(120)
(7)
13 
(124)
(187)
210 

158 
(62)

96 

73 
23 
4,114 
369 
3,219 

533 

373 
100%
100%
100%
100%

3.
4.

Includes the results of Primus and HelioFocus; the results of ZIM and Tower (up to June 30, 2015), as associated companies; as well as Kenon’s and IC Green’s holding company and general and
administrative expenses.
“Adjustments” includes inter-segment sales.
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

5. Excludes investments in associates.
6.
7.
8.
9. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2015, see “ Item 3.A Selected Financial Data

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

.”

10. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

198

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31, 2014 1

Qoros 2

Other 3
(in millions of USD, unless otherwise indicated)

Adjustments 4

Combined Carve-
Out Results

Sales 
Depreciation and amortization 
Financing income 
Financing expenses 
Share in (losses) income of associated companies

Asset impairment 
Gain from disposal of investee 
Gain from bargain purchase 
Income (loss) before taxes 
Income taxes 

Income (loss) from continuing operations

Attributable to: 

Kenon’s shareholders 
Non-controlling interests 
Segment assets 6 
Investments in associated companies 
Segment liabilities 

Capital expenditure 9 

  $

  $

  $

  $

IC Power

1,358 
(108)
9 
(132)
14 

(35)
157 
68 
321 
(99)

  $

  $

2225  

  $

  $

197 
25 
3,832 
10 
2,860 

593 

  $

— 
— 
— 
— 
(175)  

— 
— 
— 
(175)   $
— 

(175)   $

(175)  
— 
— 
221 
— 

  $

— 

  $

  $

— 
— 
39 
(10)
(10)

(13)
— 
— 
(37)
(4)

  $

  $

14 
— 
(32)
32 
— 

— 
— 
— 
— 
— 

(41)

  $

— 

  $

  $

(34)
(7)
8377  
205 
8068  

12 

  $

— 
— 
(785)
— 
(785)

— 

Adjusted EBITDA 
Percentage of combined revenues 
Percentage of combined assets 
Percentage of combined assets excluding associated companies
Percentage of combined Adjusted EBITDA 
______________________ 
1. During 2015, an immaterial error was identified with respect to the deferred tax calculation relating to the effect of foreign exchange rate on non-monetary assets in previous years in IC Power.

3485,10    $
99%  
89%  
99%  
114%  

(43) 11  $
— 
23%  
21%  
(14)%  

1%  
(12)% 
(20)% 
— 

— 
— 
— 
— 
— 

  $

  $

  $

— 

Kenon’s and IC Power’s financial information for 2014, 2013 and 2012 has been revised to correct this immaterial error.

2. Associated company.
3.

4.

5.

Includes financing income from former parent company loans to Kenon’s subsidiaries; the results of Primus, HelioFocus (from June 30, 2014), and ZIM (up to June 30, 2014); the results of ZIM
(from June 30, 2014), Tower and HelioFocus (up to June 30, 2014), as associated companies; as well as Kenon’s and IC Green’s holding company and general and administrative expenses.
“Adjustments” includes inter-segment sales, and the consolidation entries. For the purposes of calculating the “percentage of combined assets” and the “percentage of combined assets excluding
associated companies,” “Adjustments” has been combined with “Other.”
IC Power’s net income and Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, differ from the amounts reported by IC Power for the same period as a result of the
adjustment of certain provisions at IC Power, which were adjusted in IC Power’s 2014 financial statements, but were adjusted in 2015 for Kenon. For further information, see “ Item 5. Operating
and Financial Review and Prospects—Material Factors Affecting Results of Operations—IC Power—Decisions by the EA Regarding System Management Charges . ”

6. Excludes investments in associates.
7.
8.
9.
10. For a reconciliation of IC Power’s net income, as reported by Kenon, to its Adjusted EBITDA, as reported by Kenon, for the year ended December 31, 2014, see “ Item 3.A Selected Financial Data

Includes Kenon’s and IC Green’s assets.
Includes Kenon’s and IC Green’s liabilities.
Includes the additions of PP&E and intangibles based on an accrual basis.

.”

11. For a reconciliation of our “Other” reporting segment’s income (loss) to its Adjusted EBITDA, see “ Item 3.A Selected Financial Data .”

199

1,372 
(108)
16 
(110)
(171)

(48)
157 
68 
109 
(103)

6 

(12)
18 
3,884 
436 
2,881 

605 

305 
100%
100%
100%
100%

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth summary information regarding the results of operations of our equity-method businesses for the periods presented:

Year Ended
December 31,
2015
Qoros

ZIM

Tower 1

  $

2,991 
2 

  $

232 
(392)  

(2)  

— 

Six Months Ended
December 31,
2014
ZIM
(in millions of USD)
1,667 

  $

  $

462 

(1)  

— 

(72)  

2 

Year Ended
December 31,
2014
Tower

Qoros

Generandes 2

  $

138 
(350)  

— 

  $

828 
25 

(9)  

— 

  $

(392)   $

(1)   $

(70)   $

(350)   $

16 

  $

  $

— 
10 

(196)   $
— 

  $

— 
(1)  

(23)   $
10 

(175)   $
— 

  $

5 
13 

10 

  $

(196)   $

  $
  $

— 
1,912 
1,834 
201 

  $
  $

— 
1,665 
1,635 
159 

(1)   $

  $
  $

— 
— 
— 
— 

(13)   $

(175)   $

18 

  $

  $
  $

— 
2,156 
(2,077)  
191 

  $
  $

— 
1,810 
(1,670)  
221 

  $
  $

— 
874 
(738)  
14 

193 
30 

— 

30 

12 
— 

12 

12 
— 
— 
— 

Revenues

Income/(Loss) 
Other comprehensive

income/(loss)

Total comprehensive

income/(loss)

Share of Kenon in total

comprehensive
income/(loss)
Adjustments 

Share of Kenon in total

comprehensive
income/(loss) presented in
the books

Dividends received 
Total assets 
Total liabilities 
Book value of investment 
_________________________

  $

  $

  $

  $

  $
  $

1. Reflects Tower’s results of operations up to June 30, 2015. As a result of our distribution in specie of substantially all of our interest in Tower, representing 23% of the then currently outstanding

Tower shares on July 23, 2015, Tower’s results of operations for all periods subsequent to June 30, 2015 are not reflected in our consolidated financial statements.

2. Kenon’s indirect equity interest in Generandes was sold in September 2014, in connection with IC Power’s sale of its interest in Enel Generación Perú.

Revenues from Sale of Electricity

Our revenues from sales of electricity decreased by $83 million, or 6%, to $1,289 million for the year ended December 31, 2015 from $1,372 million for the year ended December 31, 2014, as a

result of IC Power’s decrease in consolidated revenues, as set forth in further detail below by IC Power’s segments.

Peru Segment

Sales from IC Power’s Peru segment increased by $11 million, or 3%, to $448 million for the year ended December 31, 2015 from $437 million for the year ended December 31, 2014,

principally as a result of a $15 million, or 21%, increase in Kallpa’s revenue from ancillary businesses to $88 million during 2015 from $73 million during 2014, which primarily resulted from an
increase in toll tariffs during 2015. As a result of a 2% increase in the average energy price charged by Kallpa to $45 per MWh in 2015 from $44 in 2014, revenues from energy sales in 2015 and 2014
were $291 million, despite a 2% decrease in the volume of energy sold by Kallpa to 6,433 GWh of energy in 2015 from 6,559 GWh sold in 2014.

These effects were partially offset by a $4 million decrease in Kallpa’s revenue from capacity sales in 2015 to $69 million in 2015 from $73 million in 2014, primarily as a result of a 2%

decrease in the volume of capacity sales to an average of 913 MW in 2015 from an average of 929 MW in 2014, which resulted from the expiration of an opportunistic short-term PPA in April 2014.

Israel Segment

Sales from IC Power’s Israel segment decreased by $87 million, or 21%, to $326 million for the year ended December 31, 2015 from $413 million for the year ended December 31, 2014, as a

result of a decrease in OPC-Rotem’s revenue from energy sales. This decrease in sales is largely due to a decrease in the EA generation component tariff in 2015, representing an average sales price
reduction in 2015 versus 2014 equivalent to 21%, as EA tariffs in the period 2012 to 2014 were incrementally higher than in previous years, reflecting higher fuel prices in 2012. This tariff forms the
basis of OPC-Rotem’s energy prices, so the decrease in the tariff in 2015 led to a decrease in sales. To a lesser degree, the decrease in sales was also the result of the strengthening of the U.S. Dollar
against the New Israeli Shekel, OPC-Rotem’s functional currency. As a result of these factors, OPC-Rotem experienced a 23% decrease in the average price of the energy it sold to $80 per MWh in 2015
from $104 per MWh in 2014. In addition, the volume of energy sold by OPC-Rotem in 2015 decreased slightly to 3,951 GWh in 2015 from 3,973 GWh in 2014.

200

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
OPC-Rotem’s declines were partially offset by an $8 million increase in revenues due to the acquisition of OPC-Hadera in August 2015.

Central America Segment

Sales from IC Power’s Central America segment increased by $29 million, or 9%, to $337 million for the year ended December 31, 2015 from $308 million for the year ended December 31,

2014, primarily as a result of IC Power’s acquisition of Puerto Quetzal in September 2014 (which generated $109 million in sales in 2015 compared to $33 million in sales in 2014 from the date of
acquisition by IC Power).

This increase was partially offset by (1) a $32 million, or 24%, reduction in Nejapa’s sales, primarily as a result of a decrease in realized energy prices due to a decrease in HFO prices; and (2) a

$14 million, or 11%, reduction in ICPNH’s sales, primarily as a result of a $24 million decrease in realized energy prices due to a decrease in HFO prices, which decline was partially offset by a $10
million increase in revenues as a result of higher than normal wind levels at Amayo I and II.

Other Segment

Sales from IC Power’s Other segment decreased by $36 million, or 17%, to $178 million for the year ended December 31, 2015 from $214 million for the year ended December 31, 2014,

primarily as a result of (1) a $34 million, or 47%, reduction in CEPP’s sales, primarily as a result of the expiration of CEPP’s PPA in September 2014, and the consequent sale of energy at lower prices
in the spot market, which resulted in a decrease in sales despite an increase in energy generation; and (2) a $10 million, or 26%, reduction in Colmito’s sales, primarily as a result of a decrease in
Colmito’s energy sales to non-regulated customers due to lower consumption.

Cost of Sales and Services (excluding Depreciation and Amortization)

Our cost of sales (excluding depreciation and amortization) decreased by $118 million, or 12%, to $863 million for the year ended December 31, 2015 from $981 million for the year ended

December 31, 2014, as a result of IC Power’s decrease in cost of sales.

IC Power’s cost of sales, as reported by Kenon, decreased by 12% to $863 million for the year ended December 31, 2015 from $983 million for the year ended December 31, 2014. IC Power’s
cost of sales (excluding depreciation and amortization), as reported by IC Power, decreased by 3% to $909 million for the year ended December 31, 2015 from $936 million for the year ended December
31, 2014. See “— Decisions by the EA Regarding System Management Charges ” for an explanation of the difference between IC Power’s cost of sales, as reported by Kenon and as reported by IC
Power, during these periods.

A description of the decrease in IC Power’s cost of sales, as reported by IC Power, is set forth in further detail below by IC Power’s segments.

Peru Segment

Cost of sales from IC Power’s Peru segment increased by $9 million, or 3%, to $279 million for the year ended December 31, 2015 from $270 million for the year ended December 31, 2014,

primarily as a result of:

·

·

a $9 million increase in transmission charges as a result of an increase in toll tariffs during 2015; and

a $5 million increase in intermediation fees as a result of new PPAs signed during 2015 with distribution companies in which the profit of the PPA is shared with the distribution company.

These effects were partially offset by a $4 million decrease in gas expenses as a result of a 12% decrease in Kallpa’s gross energy generation, the effect of which was partially offset by an

increase in the natural gas prices paid by Kallpa.

Israel Segment

Cost of sales from IC Power’s Israel segment decreased by $10 million, or 4%, to $242 million for the year ended December 31, 2015 from $252 million for the year ended December 31, 2014,
primarily as a result of a $37 million decrease in OPC-Rotem’s energy purchases as a result of a decrease in energy purchased from IEC (Israel’s system operator), to 215 GWh in 2015 from 573 GWh in
2014, and an increase in OPC-Rotem’s net generation from 3,400 GWh in 2014 to 3,736 GWh in 2015. The decrease in tariffs, which led to a reduction in revenues, did not result in a corresponding
decrease in gas prices. For further information on this reduction, see “ —Material Factors Affecting Results of Operations—EA Tariffs Affect IC Power’s Results in its Generation Business’ Israel
Segment .”

201

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
These effects were partially offset by a $23 million increase in system charges provision during the year ended December 31, 2015 as a result of additional charges implemented during 2015.

Central America Segment

Cost of sales from IC Power’s Central America segment increased by $5 million, or 2%, to $265 million for the year ended December 31, 2015 from $260 million for the year ended December

31, 2014, primarily as a result of IC Power’s acquisition of Puerto Quetzal in September 2014 (which incurred cost of sales of $94 million in 2015 as compared to $29 million in 2014 since the date of
acquisition by IC Power).

This increase was partially offset by a $25 million, or 26%, decrease in ICPNH’s cost of sales and a $34 million, or 29%, decrease in Nejapa’s cost of sales, in each case primarily as a result of

a decrease in HFO prices.

Other Segment

Cost of sales from IC Power’s Other segment decreased by $31 million, or 20%, to $123 million for the year ended December 31, 2015 from $154 million for the year ended December 31,
2014, primarily as a result of (1) a $25 million, or 45%, decrease in CEPP’s cost of sales, principally resulting from a decrease in the price of fuel purchased by CEPP and (2) an $11 million, or 31%,
decrease in Colmito’s cost of sales, primarily due to a decrease in energy purchased by Colmito in connection with lower energy prices. This decline was partially offset by IC Power’s acquisition of
JPPC in May 2014 (which incurred cost of sales of $41 million in 2015 as compared to $39 million in 2014 since the date of acquisition by IC Power).

Depreciation and Amortization

Our depreciation expenses relate primarily to IC Power.

IC Power’s depreciation and amortization expenses increased by $10 million, or 10%, to $111 million in 2015 from $101 million in 2014, primarily as a result of:

·

·

·

a $4 million or 9%, increase in IC Power’s Peru segment’s depreciation expense to $49 million in 2015 from $45 million in 2014, primarily as a result of the acquisition of Las Flores in
April 2014;

a $3 million, or 17%, increase in IC Power’s Central America segment’s depreciation expense to $21 million in 2015 from $18 million in 2014, primarily as a result of IC Power’s
consolidation of ICPNH and Puerto Quetzal in March and September 2014, respectively; and

a $3 million, or 14%, increase in IC Power’s Other segment’s depreciation expense to $25 million in 2015 from $22 million in 2014, primarily as a result of IC Power’s consolidation of
JPPC in May 2014.

Selling, General and Administrative Expenses

Our selling, general and administrative expenses consist of payroll and related expenses, bad/doubtful debts, depreciation and amortization, and other expenses. Our selling, general and

administrative expenses decreased 21% to approximately $104 million for the year ended December 31, 2015, compared to $131 million for the year ended December 31, 2014. This decrease was
primarily driven by expenses that were incurred in connection with our spin-off from IC and the listing of our ordinary shares in 2014 and expenses related to the adoption and implementation of
Kenon’s share incentive plans in 2014.

IC Power’s general, selling and administrative expenses (excluding depreciation and amortization) decreased by $5 million, or 7%, to $63 million for the year ended December 31, 2015 from

$68 million for the year ended December 31, 2014, primarily as a result of a $7 million decrease in Inkia’s legal fees as a result of the settlement of litigation relating to Crystal Power in December
2014.These effects were partially offset by the consolidation of $4 million in general, selling and administrative expenses for the year ended December 31, 2015 as a result of IC Power’s consolidation of
ICPNH, Surpetroil, JPPC and Puerto Quetzal from the dates of their respective acquisitions in March 2014, March 2014, May 2014, and September 2014, respectively.

Gain from Distribution of Dividend in Kind

On July 23, 2015, we completed the pro rata distribution of substantially all of our interest in Tower. We recognized a $210 million gain in the year ended December 21, 2015, which reflects the

difference between the fair market value of the Tower ordinary shares held by us on the distribution date ($255 million based upon the closing price of the Tower shares on NASDAQ on the date of our
distribution of such shares to our shareholders by way of a capital reduction) and the carrying amount of Tower’s shares at the time of the distribution ($45 million).

202

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Gain from Disposal of Investees

We did not generate any gain from disposal of investees in 2015.

Our 2014 gain from disposal of investees is primarily comprised of capital gains recognized from IC Power’s sale of its investment in Enel Generación Perú for $413 million in the year ended

December 31, 2014. We recognized approximately $110 million of net profit as a result of IC Power’s sale of its interest in Enel Generación Perú ($157 million of capital gains, which were offset by $47
million of income tax expenses for the year ended December 31, 2014).

Gain on Bargain Purchase

We did not generate any gain on bargain purchase in 2015.

We generated $68 million in gain on bargain purchase during the year ended December 31, 2014, reflecting IC Power’s acquisition of:

·

·

·

ICPNH in March 2014, which resulted in IC Power’s recognition of a gain of $24 million;

the 84% of the outstanding equity of JPPC which IC Power did not previously own, in May 2014, resulting in IC Power’s recognition of a gain of $24 million; and

Puerto Quetzal in September 2014, which resulted in IC Power’s recognition of a gain of $20 million.

Asset Impairment

Our $7 million asset impairment in 2015 is primarily due to IC Green writing-off its goodwill in Primus in the amount of $6 million.

Our $48 million asset impairment in 2014 is comprised of (i) an approximately $35 million impairment charge in respect of Inkia’s impairment of one if its subsidiaries and (ii) an

approximately $13 million impairment charge in respect of HelioFocus’ assets. For further information, see “ —Critical Accounting Policies and Significant Estimates—Impairment Analysis—
Impairment Test for IC Power ” and “ —Critical Accounting Policies and Significant Estimates—Impairment Analysis—Impairment Test of HelioFocus ,” respectively.

Other Expenses

Our other expenses decreased to approximately $7 million for the year ended December 31, 2015, compared to approximately $14 million for the year ended December 31, 2014.

In 2015, our “other expenses” consisted primarily of:

·

·

$4 million related to the loss on sale of property, plant and equipment, net; and

a $1 million provision for contingencies.

In 2014, our “other expenses” consisted primarily of:

·

·

$8 million related to the loss on sale of property, plant and equipment, net; and

$2 million related to a net loss on sale of spare parts.

Other Income

Our other income decreased significantly to approximately $15 million for the year ended December 31, 2015, compared to approximately $51 million for the year ended December 31, 2014.

In 2015, our “other income” consisted primarily of:

·

·

$7 million related to insurance claims, primarily related to Amayo II’s claims in respect of three wind turbines, which were damaged in December 2014; and

$4 million in dividend income from Enel Generación Perú; and

203

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

$4 million in other income.

In 2014, our “other income” consisted primarily of:

·

·

·

$18 million in dividend income from Enel Generación Perú;

$20 million resulting from changes in Kenon’s interests in Tower as a result of an increase in Tower’s outstanding share capital due to the conversion and exercise of certain of Tower’s
outstanding convertible bonds, options and warrants. As a result of Tower’s issuance of shares in connection with such conversions and exercises, our interest in Tower declined from
approximately 32% as of December 31, 2013 to approximately 29% as of December 31, 2014, resulting in our recognition of a $20 million dilution gain, which was determined by
calculating the difference between the carrying amounts of our investment in Tower immediately before and after the relevant share issuances; and

$7 million related to insurance claims, primarily related to Amayo II’s claims in respect of three wind turbines, which were damaged in December 2014.

Financing Expenses, Net

Our financing expenses, net increased 18% to $111 million for the year ended December 31, 2015, compared to $94 million for the year ended December 31, 2014.

IC Power’s financing expenses, net, which declined by $15 million, or 13%, to $104 million for 2015 from $119 million for 2014, as set forth in further detail below by segment.

Peru Segment

Financing expenses, net, from IC Power’s Peru segment increased by $8 million, or 24%, to $42 million for the year ended December 31, 2015 from $34 million for the year ended December

31, 2014, primarily as a result of an $11 million increase in foreign exchange rate losses as a result of the strengthening of the U.S. dollar against the Peruvian Sol during 2015. This increase was
partially offset by a $3 million decrease in interest expense from bank and others primarily as a result of the lower outstanding debt amount during 2015.

Israel Segment

Financing expenses, net, from IC Power’s Israel segment declined by $7 million, or 23%, to $23 million for the year ended December 31, 2015 from $30 million for the year ended December

31, 2014, primarily as a result of a decrease in OPC-Rotem’s interest expense due to a 0.9% CPI decrease, which was partially offset by the strengthening of the U.S. Dollar against the New Israeli
Shekel, OPC-Rotem’s functional currency.

Central America Segment

Financing expenses, net, from IC Power’s Central America segment increased by $2 million, or 25%, to $10 million for the year ended December 31, 2015 from $8 million for the year ended

December 31, 2014, as a result of the increase of interest expense of $2 million resulting from IC Power’s acquisitions of ICPNH and Puerto Quetzal in March and September 2014, respectively.

Other Segment

Financing expenses, net, from IC Power’s Other segment declined by $17 million, or 37%, to $29 million for the year ended December 31, 2015 from $46 million for the year ended December

31, 2014, primarily as a result of (1) the recognition of $13 million in finance expenses for the year ended December 31, 2014, as a result of repaying $95 million of capital notes to IC, reflecting the
difference between the nominal value of the capital notes ($95 million) and the book value of the capital notes ($82 million) and (2) a $7 million decrease in interest expense during the year ended
December 31, 2015 due to IC Power’s repayment of $263 million of debt owed to IC, our former parent, during May and June 2014. These effects were partially offset by a $3 million increase in interest
expense during the year ended December 31, 2015, primarily as a result of the drawing of ICPI’s mezzanine loan in June 2014.

Share In Income (Losses) of Associated Companies, Net of Tax

Our share in losses of associated companies, net of tax increased by 9% to approximately $187 million for the year ended December 31, 2015, compared to approximately $171 million for the

year ended December 31, 2014. Set forth below is a discussion of income/loss for our material associated companies and the share in income (losses) of associated companies, net of tax.

204

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros

Our share in Qoros’ comprehensive loss increased to approximately $196 million for the year ended December 31, 2015, compared to losses of approximately $175 million for the year ended

December 31, 2014. As we have a 50% equity interest in Qoros, we recognize 50% of the net loss of Qoros in 2015 (RMB2,475 million) and 2014 (RMB2,154 million). A discussion of Qoros’ results of
operations (on a 100% basis; Kenon’s share is 50%) for 2015 and 2014 is set forth below. Qoros’ results of operation for 2015 and 2014 reflect the fact that Qoros is an early stage automobile
manufacturer. Accordingly, Qoros has incurred significant expenses, including expenses relating to the launch of new models, but has not achieved significant revenues.

Qoros had revenues of RMB1,459 million in 2015 compared to revenues of RMB865 million in 2014, representing an increase of 69%. Qoros’ increased revenues in 2015 reflect a 100%

increase in vehicle sales from approximately 7,000 cars in 2014 to approximately 14,000 cars in 2015.

Qoros’ cost of sales were RMB1,713 million in 2015 compared to RMB1,019 million in 2014, representing a 68% increase. The increase in cost of sales is due to an increase in the number of

vehicles sold in 2015.

Qoros had research and development expenses of RMB278 million in 2015 compared to RMB264 million in 2014, representing an increase of 5%. Research and development expenses in 2015

reflected research and development activities conducted in connection with the launch of the Qoros 5 SUV, whereas such expenses in 2014 reflected research and development activities conducted for
the Qoros 3 Sedan.

Qoros had selling and distribution expenses of RMB820 million in 2015 compared to RMB927 million in 2014, representing a decrease of 12%. The decrease reflects a reduction in advertising

and consulting expenses due to changes in Qoros’ 2015 marketing and sales strategy and cost cutting efforts. This decrease was partially offset by an increase in Qoros’ marketing and promotion
expenses.

Qoros had administration expenses of RMB740 million in 2015 compared to RMB592 million in 2014.

As a result of the foregoing, Qoros had a loss from operation of RMB2,129 million in 2015 compared to RMB1,962 million in 2014.

Qoros had finance costs of RMB359 million in 2015 compared to finance costs of RMB217 million in 2014, representing a 65% increase. The increase was due in part to an increase in amounts

outstanding under short term and long term loans, including shareholder loans, in 2015 as compared to 2014, with total loans and borrowings (including current loans) of RMB7,489 million as of
December 31, 2015 as compared to loans and borrowings of RMB7,303 million as of December 31, 2014. Exchange rate effects also contributed to the increase in finance costs.

As a result of the foregoing, Qoros reported a loss for the year of RMB2.5 billion for the year ended December 31, 2015, compared to RMB2.2 billion for the year ended December 31, 2014.

ZIM

Our share in ZIM’s income for the year ended December 31, 2015 was approximately $2 million. Set forth below is a summary of ZIM’s results during the relevant periods:

Sales   
Cost of sales   
Gross profit   
Operating profit  
Profit before taxes on income  
Taxes on income  
Profit after taxes on income  
Profit for the period   

Year Ended
December 31, 2015  
(in millions of USD)  
2,991 
2,775 
216 
98 
5 
2 
7 
7 

  $

  $

Our share in ZIM’s loss was approximately $13 million for the six months ended December 31, 2014, the period in which Kenon accounted for ZIM’s results of operations pursuant to the

equity method of accounting. Although ZIM's results were only consolidated by Kenon during the six months ended June 30, 2014, the discussion below presents ZIM's results for the year ended
December 31, 2014 on a consolidated basis.

205

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In the year ended December 31, 2015, ZIM carried approximately 2,308,000 TEUs, as compared to approximately 2,360,000 TEUs in the year ended December 31, 2014, reflecting a 2.3%

decrease compared to the year ended December 31, 2014. The slight decrease in carried quantities was primarily due to the closure of the line from Asia to Northern Europe during the second quarter of
2014. In the year ended December 31, 2015, ZIM’s revenues were approximately $3.0 billion, as compared to approximately $3.4 billion in the year ended December 31, 2014, reflecting a 12.2%
decrease, due to reduced freight rates and a slight decrease in carried quantities. The reduction in revenues was offset by a reduction in operating expenses and cost of services, which decreased by 15.3%
to $2.8 billion in the year ended December 31, 2015, as compared to $3.3 billion in the year ended December 31, 2014, primarily due to a decrease in bunker prices, as well as a decrease in cargo
handling expenses.

ZIM publishes its results on its website. For more information, see www.ZIM.com. This website, and any information referenced therein, is not incorporated by reference herein.

Tower

Our share in Tower’s comprehensive income (loss) for the period in 2015 prior to June 30, 2015, during which period Kenon accounted for Tower’s results of operations pursuant to the equity

method of accounting, was approximately $(1) million.

Our share in Tower’s comprehensive income for the year ended December 31, 2014 was approximately $18 million.

Generandes

We did not record any comprehensive income for the year ended December 31, 2015 from Generandes, as IC Power sold its equity interest in Generandes during 2014.

Our share in Generandes’ comprehensive income for the year ended December 31, 2014 was approximately $12 million.

Tax Expenses

Our tax expenses decreased 40% to approximately $62 million for the year ended December 31, 2015, compared to approximately $103 million for the year ended December 31, 2014. This
decrease was primarily driven by a decrease in our effective tax rate to 39% in 2015 from 95% in 2014, due to an increase in non-taxable gains to $243 million in 2015, as compared to $69 million in
2014, offset by $47 million income tax expense on the sale of IC Power’s interest in Enel Generación Perú for $413 million in 2014.

Income for the Year From Discontinued Operations (After Taxes)

We did not generate any income for the year ended December 31, 2015 from discontinued operations (after taxes).

Our income for the year ended December 31, 2014 from discontinued operations (after taxes) is comprised of (i) ZIM’s results of operations for the six months ended June 30, 2014 and (ii)

Petrotec’s results of operations for the year ended December 31, 2014. Our income for the year from discontinued operations (after taxes) was approximately $471 million for the year ended December
31, 2014, primarily as a result of (i) ZIM’s results of operations during the six months ended June 30, 2014, the period in which Kenon accounted for ZIM as a discontinued operation in the amount of
$480 million of net income from the realization of discontinued operations in the amount of $609 million and (ii) the net results of Petrotec as a discontinued operation in the amount of $(9) million.

Profit for the Year

As a result of the above, our profit for the year amounted to $96 million for the year ended December 31, 2015, compared to a profit of $477 million for the year ended December 31, 2014.

B.  

 Liquidity and Capital Resources

Kenon’s Liquidity and Capital Resources

We were formed in 2014 in connection with our spin-off from IC. In connection with the spin-off, we received $35 million in cash, and entered into a $200 million credit facility with IC, or the

IC Credit Facility. As of December 31, 2016, Kenon had approximately $102 million in cash on an unconsolidated basis (of which approximately $57 million was used in March 2017 to fund
shareholder loans to Qoros, as discussed further below). In addtion, we intend to borrow up to $50 million from IC Power in the near-term. 

We have fully drawn our $200 million IC Credit Facility. As of December 31, 2016, $200 million, plus interest and fees of approximately $24 million, was outstanding under the facility. We are

dependent on our businesses for cash flows from operations and to meet our obligations under the IC Credit Facility and our back-to-back guarantees to Chery with respect to Qoros’ indebtedness, each
of which are discussed further below.

206

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
   
 
 
 
 
At December 31, 2016, Kenon has a consolidated working capital deficit (i.e., total consolidated current liabilities exceeded total consolidated current assets) of $191 million as a result of IC
Power’s working capital deficit. IC Power may seek to extend the final maturity of or refinance certain indebtedness which matures in 2017. For further information on IC Power’s liquidity, see “ —IC
Power’s Liquidity and Capital Resources .”

We believe that Kenon’s working capital (on a stand-alone basis) is sufficient for its present requirements. Other than expenses related to our day-to-day operations, our principal needs for

liquidity are expected to be expenditures related to investments in our businesses and our back-to-back guarantees to Chery with respect to Qoros’ indebtedness. In addition, Kenon may need cash if it
elects to fund shareholder loans of up to RMB388.5 million to Qoros (as discussed further below). Our businesses are at various stages of development, ranging from early stage companies to
established, cash generating businesses, and some of these businesses will require significant financing, via equity contributions or debt facilities, to further their development, execute their current
business plans, and become or remain fully-funded. We may, in furtherance of the development of our businesses, and other than with respect to ZIM, make further investments, via debt or equity
financings, in our remaining businesses.

In March 2017, Kenon agreed to fund shareholder loans of up to RMB777 million to Qoros in two equal tranches in connection with the full release of its remaining back-to-back guarantee

obligations (plus related interest and fees) to its joint venture partner Chery. The first tranche of loans were provided to Qoros in March 2017 in the amount of RMB388.5 million. After giving effect to
the first tranche of loans provided in March 2017, Kenon has outstanding back-to-back guarantee obligations to Chery of up to RMB425 million, plus certain interest and fees, in respect of certain of
Qoros’ indebtedness. Kenon may fund the provision of the second tranche of loans, upon which Kenon’s remaining back-to-back guarantee obligations to Chery will be fully released.

Kenon may not have sufficient liquidity to satisfy payment obligations under the IC Credit Facility or its back-to-back guarantees if it is required to make payments on such guarantees. In the

event that Kenon is required to make such payments, it would need to obtain such funds from its businesses, which may include IC Power (via dividends, loans or advances, or the repayment of loans or
advances to us, which may be funded by sales of assets or minority interests in our businesses), or obtain external financing, which may result in dilution of shareholders (in the event of equity financing)
or additional debt obligations for the company (in the event of debt financing). In the event Kenon is required to make payments on its back-to-back guarantees and does not have sufficient liquidity to
do so, there may be a cross-default under the IC Credit Facility.

We intend to adhere to our capital allocation principles which seek to limit cross-allocation of funds and capital contributions to our businesses, via debt or equity financings or the provisions of
guarantees. Nevertheless, the cash resources on Kenon’s balance sheet may not be sufficient to fund additional investments that we deem appropriate in our businesses or meet our guarantee obligations.
As a result, Kenon may seek additional liquidity from its businesses. For a description of our capital allocation principles, see “ Item 4.B Business Overview. ” For further information on the risks related
to the significant capital requirements of our businesses, see “ Item 3.D Risk Factors—Risks Related to Our Strategy and Operations—Some of our businesses have significant capital requirements. If
these businesses are unable to obtain sufficient financing from third party financing sources or renew or refinance their working capital facilities, they may not be able to operate, and we may deem it
necessary to provide such capital, provide a guarantee or indemnity in connection with any financings, provide collateral in connection with any financings, including via the cross-collateralization of
assets across businesses, or we may refrain from investing further in any such businesses, all of which may materially impact our financial position and results of operations. ” For a discussion of our
outstanding commitments and obligations, see “ —Kenon’s Commitments and Obligations .” For a discussion of the capital requirements of each of our businesses, see below.

Consolidated Cash Flow Statement

Year Ended December 31, 2016 Compared to Year Ended December 31, 2015

Cash and cash equivalents decreased 15% to approximately $327 million for the year ended December 31, 2016, compared to approximately $384 million for the year ended December 31,

2015. The following table sets forth our summary cash flows from our operating, investing and financing activities for the years ended December 31, 2016 and 2015:

Net cash flows provided by operating activities

IC Power 
Adjustments and Other 

Total   

Net cash flows used in investing activities  
Net cash flows provided by financing activities  
Net change in cash in period   
Cash—opening balance  
Effect of exchange rate fluctuations on balances of cash and cash equivalents

Year Ended December 31,
2015
2016

(in millions of USD)

186 
(24)  
162 
(400)  
175 
(63)  
384 
6 

Cash—closing balance   

  $

327 

  $

207

320 
(30)
290 
(737)
233 
(214)
610 
(12)

384 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
Cash Flows Provided by Operating Activities

Net cash flows provided by our operating activities are a significant source of liquidity for our subsidiaries and decreased by 44% to approximately $162 million for the year ended December

31, 2016, compared to approximately $290 million for the year ended December 31, 2015. This decrease was primarily driven by a $134 million decrease in cash flows provided by IC Power’s operating
activities, as set forth in “ Item 5.B Liquidity and Capital Resources– IC Power’s Liquidity and Capital Resources ” below. As our businesses are legally distinct from us and will generally be required to
service their debt obligations before making distributions to us, our ability to access such cash flow from our businesses may be limited in some circumstances. For further information on the risks
related to such limitations, see “ Item 3.D Risk Factors—Risks Related to Our Strategy and Operations—We are a holding company and are dependent upon cash flows from our businesses to meet our
existing and future obligations .”

Cash Flows Used in Investing Activities

Net cash flows used in our investing activities, which include our investments in our associated companies, decreased 46% to approximately $400 million for the year ended December 31,

2016, compared to approximately $737 million for the year ended December 31, 2015. This decrease was primarily driven by the $351 million decrease in cash flows used in IC Power’s investing
activities, as set forth in “ Item 5.B Liquidity and Capital Resources– IC Power’s Liquidity and Capital Resources ” below, as well as cash flows of $36 million used in 2016 in connection with the
partial release of Kenon’s back-to-back guarantee obligations to Chery in connection with Kenon’s December 2016 investment in Qoros.

Cash Flows Provided by Financing Activities

Net cash flows provided by the financing activities of our consolidated businesses are a significant source of liquidity for their operations and decreased 25% to approximately $175 million for

the year ended December 31, 2016, compared to approximately $233 million for the year ended December 31, 2015. This decrease was primarily driven by (1) the $72 million decrease in cash flows
provided by IC Power’s financing activities (excluding IC Power’s repayment of a $75 million note payable, plus $3 million of interest, to Kenon in 2016), as set forth in “ Item 5.B Liquidity and Capital
Resources– IC Power’s Liquidity and Capital Resources ” below and (2) a $34 million reduction in contributions from former partner IC (which provided Kenon with $34 million of cash in connection
with the spin-off in January 2015).

Year Ended December 31, 2015 Compared to Year Ended December 31, 2014

Cash and cash equivalents decreased 37% to approximately $384 million for the year ended December 31, 2015, compared to approximately $610 million in cash and cash equivalents for the

year ended December 31, 2014. The following table sets forth our summary cash flows from our operating, investing and financing activities for the years ended December 31, 2015 and 2014:

Net cash flows provided by operating activities

IC Power 
Adjustments and Other 

Total   
Net cash flows used in investing activities  
Net cash flows provided by financing activities  
Net change in cash in period   
Cash—opening balance  
Effect of exchange rate fluctuations on balances of cash and cash equivalents

Cash—closing balance   

Cash Flows Provided by Operating Activities

Year Ended December 31,
2014
2015

(in millions of USD)

320 
(30)  
290 
(737)  
233 
(214)  
610 
(12)  

  $

384 

  $

413 
(3)
410 
(883)
430 
(42)
671 
(19)

610 

Net cash flows provided by our operating activities are a significant source of liquidity for our subsidiaries and decreased 29% to approximately $290 million for the year ended December 31,

2015, compared to approximately $410 million for the year ended December 31, 2014. This decrease was primarily driven by a decrease in cash flows provided by IC Power’s operating activities, as set
forth in “ Item 5.B Liquidity and Capital Resources– IC Power’s Liquidity and Capital Resources ” below.

208

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
Cash Flows Used in Investing Activities

Net cash flows used in our investing activities, which include our investments in our associated companies, decreased to approximately $737 million for the year ended December 31, 2015,

compared to approximately $883 million for the year ended December 31, 2014. This decrease was primarily driven by (1) the $311 million exit from the combination and transition to associate
company, less cash eliminated relating to ZIM in 2014; (2) a $170 million decrease in proceeds from short-term deposits and loans, (3) a $58 million decrease in cash paid for businesses purchased, less
cash acquired in 2015 (e.g., IC Power’s acquisition of OPC-Hadera) as compared to 2014 (e.g., IC Power’s acquisitions of ICPNH, JPPC, Surpetroil and Puerto Quetzal) and (4) a $50 million reduction
in amounts invested in Qoros during 2015, offset by (1) $360 million net proceeds received by IC Power in connection with its sale of its indirect interest in Enel Generación Perú in 2014 and (2) an
increase in acquisitions of property, plant and equipment of $92 million in 2015 as compared to 2014 in connection with the construction of the Samay I and CDA plants and the Kanan project’s
installation and interconnection to Panama’s power system in 2015.

Cash Flows Provided by Financing Activities

Net cash flows provided by the financing activities of our consolidated businesses are a significant source of liquidity for their operations and decreased 4% to approximately $233 million for
the year ended December 31, 2015, compared to approximately $430 million for the year ended December 31, 2014. This decrease was primarily driven by (1) a $380 million reduction in contributions
from former parent IC and (2) a $411 million decrease in proceeds from long-term loans and debentures, primarily due to a decrease in IC Power’s receipt of proceeds from long-term loans during the
year ended December 31, 2015, offset by Kenon’s drawdowns under the IC Credit Facility, which it entered into in 2015. The decrease in cash flows provided by financing activities was offset by
payments by IC Power to its former parent IC of $300 million in 2014 (as compared to nil in 2015), (2) a $77 million decrease in interest paid in 2015, as compared to 2014 and (3) a $209 million
increase in proceeds from short-term loans.

Kenon’s Commitments and Obligations

As of December 31, 2016, Kenon had consolidated liabilities of $4.2 billion. We have fully drawn our $200 million IC Credit Facility. As of the date of this annual report, the aggregate amount

outstanding under the IC Credit Facility was $224 million, including interest and fees.

In 2016, Kenon’s major shareholder Ansonia made loans of $72 million to our subsidiary Quantum (which were used by Quantum to make back-to-back loans to Qoros).

In addition, as of the date of this annual report, Kenon has obligations under its back-to-back guarantees provided by it to Chery, which amounted to RMB425 million, plus interest and certain

fees. For further information on, and an overview of, the guarantees provided by Kenon in respect of Qoros’ debt, see “ —Back-to-Back Guarantees Provided to Chery .”

As of the date of this annual report, other than amounts outstanding under the IC Credit Facility, shareholder loans provided by Ansonia and the back-to-back guarantees we have provided to

Chery in respect of certain of Qoros’ indebtedness, we, at the Kenon level, have no outstanding indebtedness or financial obligations and are not party to any credit facilities or other committed sources
of external financing.

Set forth below is a summary of these obligations.

IC Credit Facility

In connection with the consummation of the spin-off, IC provided us with a $200 million credit facility. As of the date of this annual report, the aggregate amount outstanding under this facility

was $224 million, including interest and fees.

Interest

The IC Credit Facility bears interest at a rate of 12-Month LIBOR + 6% per annum, which, during the initial five-year term of the IC Credit Facility, will be capitalized as a payment-in-kind and

added to the aggregate outstanding amount of the IC Credit Facility. If we decide to extend the repayment schedule in accordance with the terms of the IC Credit Facility, as set forth below, and we do
not repay the aggregate outstanding amount owed under the IC Credit Facility within the initial five-year term, additional interest accruing on the aggregate outstanding amount as of the final date of the
initial five-year term will become payable in cash on an annual basis.

Repayment Date

The aggregate amount outstanding under the IC Credit Facility (including interest or commitment fees that have accrued and been capitalized as payments-in-kind during the initial five-year
term) is due five years from the date of the IC Credit Facility, unless extended as set forth below. In the event an initial listing or offering of IC Power’s shares has been effected, the aggregate amount
outstanding under the IC Credit Facility, including any interest or commitment fees accrued and capitalized to date, will be due within 18 months from such date. However, we are entitled, at each
repayment date, to extend the repayment date for two-year periods if, as of the date of our delivery of our notice of repayment extension, an initial listing or offering of IC Power’s shares has not yet been
effected. Notwithstanding the above, the final repayment date may not, under any circumstances, be more than ten years from the date of the IC Credit Facility.

209

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Commitment Fee

During the initial five-year term, we will pay IC an annual commitment fee equal to 2.1% of the undrawn amount of the IC Credit Facility, which will be capitalized as a payment-in-kind and

added to the outstanding amount of the IC Credit Facility. Additionally, we may voluntarily prepay the outstanding principal amount of the IC Credit Facility at any time without premium or penalty.

Pledge of Equity Interest in IC Power

The following interests have been pledged on a first priority basis, in favor of IC, to secure the IC Credit Facility as set forth below:

·

·

·

66% of the shares of ICP;

66% of the shares of IC Power; and

the $145 million note owing from IC Power to Kenon entered into in connection with the reorganization of IC Power.

The pledge over the shares of ICP is expected to be released upon an IPO of IC Power. In addition, the pledge over the shares of IC Power and the $145 million note owing from IC Power to

Kenon can be released upon an IPO of IC Power, subject to Kenon’s meeting of a financial ratio.

Restrictive Covenants

The IC Credit Facility contains incurrence covenants restricting our ability to encumber certain assets and distribute dividends.

For example, prior to a listing or offering of IC Power’s equity, the IC Credit Facility prohibits us from distributing dividends to our shareholders, unless such dividends consist of all, or a

portion of, our equity interests in ZIM.

There are further restrictions on dividends following an IPO or listing of IC Power’s equity. If, any time after a listing of IC Power’s equity, we seek to (i) distribute a dividend to our
shareholders (in cash or in kind), (ii) incur additional debt, (iii) sell, transfer, or allocate a portion, or all, of our interest in IC Power, or (iv) sell all of IC Power’s assets, the IC Credit Facility will require
the value of Kenon’s remaining interest in IC Power to be equal to at least two times Kenon’s net debt (which shall be equal to the outstanding principal amount of the IC Credit Facility plus the
outstanding principal amount of any additional debt owed by Kenon to third-parties minus Kenon’s cash on hand), in each case plus interest and fees. Although a failure to comply with any of the
aforementioned covenants will not constitute an event of default under the terms of the IC Credit Facility, Kenon will be restricted from distributing dividends or incurring additional debt and, should
Kenon distribute dividends or incur additional indebtedness notwithstanding such restrictions, such actions will constitute an event of default under the terms of the IC Credit Facility. If Kenon is unable
to meet such ratio, Kenon may not make distributions to its shareholders or incur additional indebtedness.

Additionally, following an IPO or listing of IC Power’s equity, we will not engage in certain transactions, as set forth in the IC Credit Facility, which would result in a de-listing of IC Power’s

shares from the exchange on which such shares are trading.

Assignability

We may not assign or delegate our rights and obligations under the IC Credit Facility without IC’s prior written consent, except that we may assign our rights and obligations under the IC Credit

Facility to an affiliate, provided that we remain jointly and severally liable for all such obligations with such affiliate, and further provided that such assignment or delegation shall not serve to prejudice
any of IC’s rights under the terms of the IC Credit Facility.

IC is entitled to assign or delegate its rights and obligations under the IC Credit Facility in its sole discretion, and without our prior written consent.

210

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
For information on the risks related to Kenon’s ability to repay, or maintain compliance with, the IC Credit Facility from IC, see “ Item 3.D Risk Factors—Risks Related to Our Strategy and

Operations—Kenon has significant repayment obligations under the IC Credit Facility. ”

Back-to-Back Guarantees Provided to Chery

Kenon provided back-to-back guarantees to Chery in respect of certain of Qoros’ RMB3 billion EXIM bank credit facility and its RMB700 million EXIM bank loan facilities. As of December

31, 2015, the outstanding amount of these back-to-back guarantees was RMB1,100 million (plus certain interest and fees). In December 2016 and March 2017, Kenon entered into agreements with
Chery to provide financing to Qoros of up to RMB1,027 million in connection with a full release of Kenon’s back-to-back guarantee obligations to Chery (as discussed further below).

In December 2016, Kenon provided a RMB250 million shareholder loan to Qoros, and in connection with this loan, the maximum amount of Kenon’s back-to-back guarantee obligations to

Chery was reduced by RMB250 million. In addition, Kenon’s major shareholder Ansonia committed to fund RMB25 million of Kenon’s remaining back-to-back guarantee obligations to Chery in certain
circumstances. After giving effect to this transaction and Ansonia’s commitment to fund a portion of Kenon’s back-to-back guarantees, Kenon’s exposure with respect to its back-to-back guarantee
obligations was reduced from RMB1,100 million (plus certain interest and fees) to RMB825 million (plus certain interest and fees). For further information on these loans, see “— Qoros’ Liquidity and
Capital Resources —Material Indebtedness — December 2016 Shareholder Loans to Qoros .”

In March 2017, Kenon agreed to fund shareholder loans of up to RMB777 million to Qoros in two equal tranches in connection with the full release of its remaining RMB850 million back-to-

back guarantee obligations (plus related interest and fees) to Chery. The first tranche of loans were provided to Qoros in March 2017 in the amount of RMB388.5 million, reducing Kenon’s back-to-back
guarantee obligations to Chery by RMB425 million. As part of the RMB388.5 million first tranche loans to Qoros, Kenon funded 50% of this amount on behalf of Chery in connection with 50% of the
RMB425 million guarantee reduction discussed above and 50% of this amount on behalf of Kenon.

Should the second tranche of loans be provided, they are expected to be made on substantially similar terms to the first tranche loans. Kenon’s remaining back-to-back guarantee obligations to
Chery will be fully released upon its provision of the second tranche loans. For further information on Kenon’s March 2017 agreement to fully release its guarantee obligations, see “— Qoros’ Liquidity
and Capital Resources—Material Indebtedness — March 2017 Shareholder Loans to Qoros .”

Set forth below is an overview of Kenon’s back-to-back guarantee obligations in respect of Qoros’ outstanding obligations, after giving effect to the reduction of the back-to-back guarantees

discussed above

December 2016
Shareholder Loans
First Tranche Loans

Timing
Completed in December 2016

Amount of
Loans to Qoros
RMB250 million

Completed in March 2017

RMB388.5 million

Second Tranche Loans

To be determined

RMB388.5 million

Total

RMB1,027 million

Amount of
Guarantee
Obligations
Prior to Loan
RMB1,100 million (plus interest
and fees)
RMB850 million (plus interest
and fees) 1
RMB425 million (plus certain
interest and fees) 1
—

Release of
Kenon
Guarantees to
Chery
RMB250 million (plus certain
interest and fees) 1
RMB425 million (plus certain
interest and fees)
RMB425 million (plus certain
interest and fees)
RMB1,100 million (plus interest
and fees)

Remaining
Guarantee
Obligations
Post-Loan
RMB825 million (plus certain
interest and fees)
RMB425 million (plus certain
interest and fees)
—

—

_____________________________
1.   Kenon’s major shareholder Ansonia committed to fund RMB25 million of Kenon’s back-to-back guarantee obligations in certain circumstances.

211

 
 
 
 
 
 
 
 
 
 
 
 
 
Debt Owed to Kenon from Subsidiaries

$220 Million of Notes from IC Power

In connection with the reorganization of IC Power, IC Power issued notes of $145 million and $75 million payable to Kenon. The proceeds of the notes were applied by IC Power towards

paying the purchase consideration for the acquisition of Kenon’s entire equity interest in ICP. The notes both bear interest at a rate of LIBOR + 6% per annum until the date the notes are fully paid. In
October 2016, IC Power prepaid in full its $75 million note to Kenon. The proceeds that Kenon received provided Kenon with additional cash resources in light of its liquidity position and its obligations
under its back-to-back guarantees of Qoros’ indebtedness.

Debt Owed to Kenon from Subsidiaries

Prior to the spin-off, some of our businesses borrowed funds from, or issued capital notes to, IC. IC transferred its interest in each of the outstanding loans and capital notes to Kenon in

connection with the spin-off. These loans and capital notes, as well as loans and capital notes provided to Kenon subsequent to the spin-off, are described below.

Quantum Capital Notes

Quantum issued a series of capital notes to IC or Kenon, as applicable, in connection with each of IC’s or Kenon’s, as applicable, equity contributions to Qoros. The capital notes issued by

Quantum bear no interest and are not linked.

Qoros Shareholder Loans

In January 2016 and February 2016, Kenon, through its wholly-owned subsidiary Quantum, contributed RMB275 million to Qoros via shareholder loans. Chery has also made similar

shareholder loans to Qoros.

In December 2016, Kenon provided a RMB250 million shareholder loan to Qoros, and in connection with this loan from Kenon, the maximum amount of Kenon’s exposure with respect to its

back-to-back guarantee obligations to Chery was reduced by RMB275 million as follows. As part of the loan to Qoros, Kenon’s back-to-back guarantee obligations to Chery with respect to Chery’s
guarantee of Qoros’ RMB3 billion loan facility with the EXIM Bank was reduced from RMB750 million to RMB500 million. In addition, Kenon’s major shareholder Ansonia committed to fund RMB25
million of Kenon’s remaining back-to-back guarantee obligations to Chery in certain circumstances.

In connection with Kenon’s loan to Qoros, Chery also agreed to make a corresponding RMB250 million loan to Qoros. The proceeds of these loans were used to support Qoros’ ordinary course

working capital requirements and Qoros’ investments in new initiatives, such as new-energy vehicles, while it continues its fund raising efforts.

As part of this transaction, Kenon’s subsidiary Quantum pledged approximately 9% of the outstanding shares of Qoros to Chery to secure the back-to-back guarantee reduction of RMB250

million (i.e., if Chery is required to make payments on its guarantee of Qoros’ debt, then to the extent that Chery makes payments that would have been reimbursed by Kenon but for the back-to-back
guarantee reduction, Chery will be entitled to enforce this pledge). Chery may also borrow from Quantum up to 5% of Qoros’ outstanding shares to meet its pledge obligations under the RMB1.2 billion
credit facility. The number of Qoros shares pledged to Chery is subject to adjustment from time to time. In certain circumstances, Quantum must pledge additional shares (to the extent it has
unencumbered shares), and in other circumstances the pledged shares may be released and the borrowed shares must be returned (e.g., in the event that Quantum is required to pledge additional shares to
secure the RMB1.2 billion credit facility).

As of December 31, 2016, the outstanding balance of the shareholder loans by Kenon, through its wholly-owned subsidiary, Quantum to Qoros was RMB700 million.

In addition, in March 2017, Kenon funded shareholder loans of RMB388.5 million to Qoros, as discussed further in “-— Qoros’ Liquidity and Capital Resources——Material Indebtedness—

March 2017 Shareholder Loans to Qoros .”

These shareholder loans may be converted into equity upon the satisfaction of certain conditions, including the approval of the relevant Chinese authorities.

The following discussion sets forth the liquidity and capital resources of each of our businesses.

IC Power’s Liquidity and Capital Resources

As of December 31, 2016, IC Power had cash and cash equivalents of $219 million. IC Power had no short-term deposits as of December 31, 2016. In addition, Kenon intends to borrow up to

$50 million from IC Power in the near-term.

212

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power’s total outstanding consolidated indebtedness was $3,072 million as of December 31, 2016, excluding the $145 million note payable to Kenon. IC Power regularly assesses

opportunities to refinance its indebtedness in the capital markets and through bank loans, among other sources.

IC Power’s principal sources of liquidity have traditionally consisted of cash flows from operating activities, including dividends received from entities in which IC Power owns non-controlling

interests; short-term and long-term borrowings; and sales of bonds in domestic and international capital markets. IC Power does not have funds designated for, or subject to, permanent reinvestment in
any country in which IC Power operates. Distributions of the earnings of IC Power’s foreign subsidiaries are subject to the withholding taxes imposed by the foreign subsidiaries’ jurisdictions of
incorporation. From time to time, however, IC Power may be unable to receive dividends from its subsidiaries and associated company as a result of a lack of distributable reserves or limitations under
IC Power’s contractual arrangements.

In addition, IC Power is also limited in usage of certain cash, with such restricted cash constituting an aggregate amount of $89 million, $252 million and $88 million as of December 31, 2016,

December 31, 2015 and December 31, 2014, respectively, either because such cash deposits are time deposits or as a result of the loan covenants relating to IC Power’s Bolivian, Chilean, Nicaraguan,
Guatemalan, Jamaican and Israeli assets.

IC Power’s principal needs for liquidity generally consist of capital expenditures related to the development and construction of generation projects and the acquisition of other generation

companies; working capital requirements (e.g., maintenance costs that extend the useful life of IC Power’s plants); and dividends on IC Power’s ordinary shares. As part of IC Power’s growth strategy,
IC Power expects to develop, construct and operate greenfield projects in the markets that IC Power serves as well as starts projects or acquire controlling interests in operating assets within and outside
Latin America. IC Power’s development of greenfield projects and its acquisition activities in the future may require IC Power to make significant capital expenditures and/or raise significant capital. IC
Power believes that its liquidity is sufficient to cover its working capital needs in the ordinary course of IC Power’s business.

As of December 31, 2016, IC Power had negative working capital. IC Power’s $120 million ICPDH Credit Agreement and $100 million Overseas Facility mature in June 2017 and November

2017, respectively. IC Power may seek to extend the final maturity of or refinance such indebtedness.

IC Power’s Cash Flows

Year Ended December 31, 2016 Compared to Year Ended December 31, 2015

The following table sets forth IC Power’s summary cash flows from IC Power’s operating, investing and financing activities for the years ended December 31, 2016 and 2015:

Net cash flows provided by operating activities  
Net cash flows used in investing activities  
Net cash flows (used in)/provided by financing activities   
Net change in cash in period   
Cash—opening balance  
Effect of exchange rate on the cash  

Cash—closing balance

IC Power’s Cash Flows Provided by Operating Activities

Year Ended December 31,
2015
2016

  $

  $

($ millions)
186 
(270)  
(62)  
(146)  
360 
5 

  $

219 

  $

320 
(621)
88 
(213)
583 
(10)

360 

Cash flows provided by IC Power’s operating activities are its primary source of liquidity and decreased by 42% to $186 million for the year ended December 31, 2016 from $320 million for
the year ended December 31, 2015. This decrease was primarily driven by (1) a $57 million decrease in OPC-Rotem’s net cash flows from operating activities as a result of a $40 million system costs
provision paid by OPC-Rotem in February 2016 and lower operating results during the period; (2) a $24 million decrease in ICPNH’s net operating cash flows as a result of a timing difference in
collection from customers (as January 2016 payables to ICPNH were collected during December 2015), as well as lower energy sales due to lower wind levels at the Amayo plants; (3) a $23 million
decrease in CEPP’s net cash flows from operating activities as a result of the collection of $31 million from its accounts receivable due to the debt recognition and payment agreement signed by CEPP,
the Dominican Republic’s regulator and three distribution companies in September 2015; and (4) a $14 million decline as a result of the consolidation of negative operating cash flows from DEORSA
and DEOCSA due to their respective payments of $29 million and $50 million in connection with tax claims raised by the Guatemalan Tax Administrator up to December 2016.

213

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
IC Power’s Cash Flows Used in Investing Activities

Cash flows used in IC Power’s investing activities decreased by 57% to $270 million for the year ended December 31, 2016 from $621 million for the year ended December 31, 2015. This
decrease was primarily driven by (1) a $305 million increase in proceeds of short-term deposits and restricted cash, net, principally as a result of the release of funds held in escrow for the account of
ICPDH and the release of short-term deposits, both in connection with IC Power’s acquisition of Energuate; and (2) a $229 million decrease in acquisitions of property, plant and equipment, as discussed
below. These effects were partially offset by $206 million of cash used in business combinations (net of cash acquired), related primarily to IC Power’s acquisition of Energuate.

During 2016, net cash used in investing included primarily: (1) $290 million related to acquisitions of property, plant and equipment, of which $72 million was used in the construction of the

CDA plant, $66 million was used in the construction of the Samay I plant, $53 million was used in the construction of the OPC-Hadera plant, and $16 million was used in Kanan’s project installation and
connection to Panama’s power system, and (2) $206 million disbursed for the business combination (net of the cash acquired) related to IC Power’s acquisition of Energuate and two related businesses.
The effects of these factors were partially offset by IC Power’s receipt of $222 million in short-term deposits and restricted cash, net, mainly related to the $117 million released by ICPDH in connection
with IC Power’s acquisition of Energuate and the $47 million released by ICPI in connection with its repayment of one of the facilities under the ICPI Mezzanine Financing Agreement in January 2016.

During 2015, investing activities for which IC Power used cash primarily consisted of (1) acquisitions of property, plant and equipment of $518 million, which primarily consisted of $225

million used in the construction of Samay I, $187 million used in the construction of CDA’s plant, $29 million used in Kanan’s project installation and interconnection to Panama’s power system and $9
million used in the acquisition of OPC-Hadera; (2) $83 million for short-term deposits and restricted cash, net, principally related to the funds received by ICPDH, which acquired indirect equity
interests in DEORSA, DEOCSA, RECSA and Guatemel, in connection with the short-term loan for the acquisition of such businesses in January 2016; and (3) $17 million related to the acquisition of
intangibles.

IC Power’s Cash Flows Provided by Financing Activities

Cash flows disbursed from IC Power’s financing activities were $62 million for the year ended December 31, 2016 compared to $88 million provided by IC Power’s financing activities for the

year ended December 31, 2015.

During the year 2016, IC Power received aggregate proceeds of $641 million from its incurrence of long-term debt, which included:

·

·

·

·

·

·

·

·

·

$350 million from the May 2016 issuance of Kallpa bonds;

$100 million borrowed under the Overseas Facility;

$55 million borrowed under the Kanan Credit Facility;

$44 million borrowed under the CDA Finance Facility;

$24 million borrowed under the DEOCSA Syndicated Loan Facility;

$20 million borrowed under the Samay I Finance Facility;

$22 million from the issuance of the COBEE Bonds;

$16 million borrowed under the DEORSA Syndicated Loan Facility; and

$12 million borrowed under the Puerto Quetzal Finance Facility.

In addition, IC Power received net proceeds of $33 million from short-term borrowings and $9 million of capital contributions from minority shareholders related to CDA and Surpetroil.

During 2016, IC Power used cash to (1) make payments of long-term debt and capital notes of $445 million, including cash used for the repayment of Kallpa’s bonds with the proceeds from

Kallpa’s issuance of $350 million of bonds in May 2016, (2) pay $151 million of interest on borrowings, (3) repay a $75 million note payable to Kenon, plus $3 million of interest; (4) pay $29 million of
issuance expenses and premium mainly in connection with the Kallpa bonds and the Overseas Facility, and (5) distribute dividends of $33 million to IC Power’s subsidiaries´ minority shareholders.

214

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
During 2015, IC Power received aggregate proceeds of $226 million from the incurrence of long-term debt and $6 million from equity investments from certain of its partners, as follows:

·

·

·

·

$138 million borrowed under the Samay I Finance Facility;

$85 million borrowed under the CDA Finance Facility;

$6 million from the investment of Energía del Pacífico in CDA and the investment of the minority partner in Surenergy; and

$3 million borrowed under Tipitapa Power’s loan agreement.

The receipt of such proceeds were offset by repayments of long-term notes, debentures and capital notes of $138 million in 2015.

Year Ended December 31, 2015 Compared to Year Ended December 31, 2014

The following table sets forth IC Power’s summary cash flows from IC Power’s operating, investing and financing activities for the years ended December 31, 2015 and 2014:

Net cash flows provided by operating activities  
Net cash flows used in investing activities  
Net cash flows provided by financing activities  
Net change in cash in period   
Cash—opening balance  
Effect of exchange rate on the cash  

Cash—closing balance

IC Power’s Cash Flows Provided by Operating Activities

Year Ended December 31,
2014
2015

  $

  $

($ millions)
320 
(621)  
88 
(213)  
583 
(10)  

  $

360 

  $

413 
(378)
47 
82 
517 
(16)

583 

Net cash flows provided by IC Power’s operating activities are IC Power’s primary source of liquidity and decreased by 23% to $320 million for 2015 from $413 million for 2014. This decrease
was primarily driven by (1) a $107 million decrease in OPC-Rotem’s net cash flows from operating activities, primarily as a result of a lower generation component tariff, which serves as the base for the
price calculation for the billing of OPC-Rotem’s customers; and (2) $22 million in dividends from discontinued operations as a result of the sale of Enel Generación Perú, which took place in 2014.

These factors were partially offset by (1) a $15 million increase in ICPNH´s net cash flows from operating activities primarily as a result of full year of ICPNH´s operations and increased
revenue from Amayo I and Amayo II as a result of better wind conditions; (2) a $9 million increase in CEPP’s net cash flows from operating activities, primarily as a result of the collection of $32
million from its accounts receivable as a result of the debt recognition and payment agreement signed by CEPP, the Dominican Regulator and three distribution companies in September 2015; (3) a $7
million increase in Inkia’s net cash flows from operating activities primarily as a result of lower legal expenses during 2015; and (4) a $3 million increase in Chilean´s net cash flows from operating
activities primarily as a result of better 2015 operating results in Central Cardones and Colmito.

IC Power’s Cash Flows Used in Investing Activities

Net cash flows used in IC Power’s investing activities increased by 64% to $621 million for 2015 from $378 million for 2014.

During 2015, investing activities for which IC Power used cash primarily consisted of (1) acquisitions of property, plant and equipment of $518 million, of which $225 million was used in the

construction of Samay I, $187 million was used in the construction of CDA’s plant, and $29 million was used in Kanan’s project installation and interconnection to Panama’s power system; (2) $83
million for short-term deposits and restricted cash, net, principally related to the funds received by ICPDH, which holds indirect equity interests in DEORSA, DEOCSA, RECSA and Guatemel, in
connection with the short-term loan for the acquisition of such businesses; and (3) $17 million related to the acquisition of intangibles.

During 2014, cash flows used in IC Power’s investing activities primarily consisted of acquisitions of property, plant and equipment of $426 million, of which $260 million was used in
connection with the construction of CDA’s plant and $85 million was used in connection with the construction of Samay I; (2) $221 million for short-term deposits and restricted cash, net, in connection
with the opening of time deposits related to the proceeds from Enel Generación Perú sale; and (3) $70 million (net of cash received) to complete the acquisitions of ICPNH, JPPC, Surpetroil and Puerto
Quetzal. The effects of these expenditures were partially offset by $360 million of net proceeds received by IC Power in connection with its sale of its indirect equity interest in Enel Generación Perú in
September 2014.

215

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
IC Power’s Cash Flows Provided by Financing Activities

Net cash flows provided by IC Power’s financing activities increased by 87% to $88 million for 2015 compared to $47 million for 2014.

During 2015, IC Power received aggregate proceeds of $226 million from its incurrence of long-term debt and $6 million from equity investments from certain of its partners, as follows:

·

·

·

·

$138 million borrowed under the Samay I Finance Facility;

$85 million borrowed under the CDA Finance Facility;

$3 million borrowed under Tipitapa Power’s loan agreement; and

$6 million from the investment of Energía del Pacífico in CDA and the investment of the minority partner in Surenergy.

The receipt of such proceeds were offset by repayments of long-term notes, debentures and capital notes of $138 million in 2015.

During 2014, IC Power received aggregate proceeds of $667 million from IC Power’s issuance of long-term debt and $20 million from equity investments from certain of IC Power’s partners,

as follows:

·

·

·

·

·

·

·

·

$319 million borrowed under the CDA Finance Facility;

$153 million borrowed under the Samay I Finance Facility;

$93 million borrowed under ICPI’s credit facility;

$43 million from the issuance of the COBEE bonds;

$25 million from the issuance of the CEPP bonds;

$23 million borrowed under Colmito’s credit facility;

$2 million borrowed under Tipitapa Power’s loan agreement; and

$20 million from the investment of Energía del Pacífico in Samay I.

In addition, in 2014, IC Power made payments of $300 million to IC, IC Power’s former parent. In May 2014, IC Power repaid $168 million of intercompany debt owed to IC. In June 2014, IC

Power repaid $95 million of capital notes owed to IC and declared and distributed dividends of $37 million to IC.

IC Power’s Material Indebtedness

As of December 31, 2016, IC Power had cash and cash equivalents of $219 million, restricted cash of $89 million, and total outstanding consolidated indebtedness of $3.1 billion (excluding IC

Power’s $145 million note payable to Kenon), consisting of $483 million of short-term indebtedness, including the current portion of long-term indebtedness, and $2,590 million of long-term
indebtedness.

 Other than with respect to certain of its indebtedness of its subsidiaries, including OPC-Rotem, DEORSA, DEOCSA, ICPI and COBEE, IC Power’s outstanding consolidated indebtedness is

primarily denominated in, indexed to, or the subject of interest rate swaps tied to, the U.S. Dollar. Additionally, OPC-Hadera’s NIS 1 billion (approximately $261 million) loan agreement, entered into in
July 2016, is not denominated in, indexed to, or the subject of interest rate swaps tied to, the U.S. Dollar.

216

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table sets forth selected information regarding IC Power’s principal outstanding short-term and long-term debt, as of December 31, 2016:

Outstanding 
Principal Amount
as 
of December 31,
2016
($ millions)

Interest Rate  

  Final Maturity   Amortization   Schedule

448 

12 

8.375%

0.75%

April 2021

  Bullet payment at final maturity

2019

  Bullet payment at final maturity

3652   

4.85%-5.36%  

July 2031

  Quarterly principal payments to maturity

119 

  LIBOR+4.00%  

June 2017

  Bullet payment at final maturity

52 

7.75%

2029

  Annual principal payments to maturity

COBEE IV bonds 

60

Various

Various

LIBOR+4.25% -
5.50%
LIBOR+4.25% - 
6.25%
LIBOR+2.75% -
3.60%
LIBOR+2.75% - 
3.60%

LIBOR+2.125% -
2.625%

August 2024

Quarterly principal payments to maturity

August 2024

Bullet payment at final maturity

August 2024

Quarterly principal payments to maturity

August 2027

Quarterly principal payments commencing in May 2024 to
maturity

December 2021

29% of principal to be paid in 23 quarterly payments to maturity

71% of principal to be paid in bullet payment at final maturity

7.15%
4.875%

  October 2023   Quarterly principal payments to maturity

May 2026

  Bullet payment at final maturity

Various

  November 2017   Bullet payment at final maturity

Various

Various

Series B: semi-annual principal payments until maturity
Series C: Semi-annual principal payments commencing in
February 2017
First additional series of notes: bullet payment at final maturity
Series additional series of notes: semi-annual principal payments
to maturity
Series A: bullet payment at final maturity
Series B: 4 semi-annual principal payments commencing in July
2018
Series C: 8 semi-annual principal payments commencing in July
2020
  Various

336 

181 
40

22

307

88 
326 

97 

20

4 

10

Various

2017-2024

6.00%

January-March 
2019

Bullet payment at final maturity

22 
13 

  LIBOR+1.90%  
  LIBOR+2.75%  

August 2021
August 2021

  Semi-annual principal payments to maturity
  Bullet payment at final maturity

17 

7.9%

  December 2028   Semi-annual principal payments to maturity

217

Inkia:

Inkia notes 

IC Power Asia Development Ltd:

Bank Hapoalim New York 

OPC:

Financing agreement 1 

ICPDH:

ICPDH credit agreement 

IC Power Israel 3 :

Tranche B 

Cerro del Águila:

Tranche A 

Tranche B 

Tranche D1 

Tranche D2 

Samay I:

Samay I Finance Facility 

Kallpa:

Las Flores lease 
Kallpa notes due 2026 
Overseas Investments Peru
Overseas Facility 

COBEE:

COBEE III bonds 

COBEE bonds premium

CEPP:

CEPP bonds 

Central Cardones:

Tranche 1 
Tranche 2 

Colmito:

Banco Bice 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
    
 
 
 
 
 
 
 
  
 
  
 
 
 
    
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
    
 
 
 
 
 
JPPC:

Royal Bank of Canada 
Burmeister & Wain Scandinavian Contractor 

ICPNH:

Amayo I 
Amayo II 
Tipitapa Power 
Corinto 

Puerto Quetzal:

Banco Industrial 

Kanan:

Kanan Credit Facility 

DEORSA:

Syndicated loan 

DEOCSA:

Syndicated loan 

RECSA:

Banco G&T Continental 
Short Term Loans from Banks 

Total 

Outstanding 
Principal Amount as 
of December 31,
2016

1 
1 

43 
31 
6 
7 

12 

46

Interest Rate

  Final Maturity  

Amortization   Schedule

LIBOR+5.5%  

3.59%

Various
Various
8.35%
8.35%

March 2017
August 2018

  Quarterly principal payments to maturity
  Monthly principal payments to maturity

February 2023
  Quarterly principal payments to maturity
September 2025   Quarterly principal payments to maturity
  November 2018   Quarterly principal payments to maturity
December 2018   Quarterly principal payments to maturity

LIBOR+4.5%  

December 2021   Quarterly principal payments to maturity

LIBOR+3.00%
(with a floor of
3.50%

March 2021

Quarterly principal payments to maturity

1134    

Various

2021-2025

  Quarterly principal payments to maturity

1745    

Various

2021-2025

  Quarterly principal payments to maturity

TAPP-6.63%  

Various

2020
2017

  Semi-annual principal payments to maturity
  These loans have no amortization schedule

5 
94 

3,072 

1. The consortium includes Bank Leumi Le-Israel B.M. and institutional entities from the following groups: Clal Insurance Company Ltd.; Amitim Senior Pension Funds; Phoenix Insurance Company

Ltd.; and Harel Insurance Company Ltd.

2. Represents NIS 1,402 million converted into U.S. Dollars at the exchange rate for New Israeli Shekels into U.S. Dollars of NIS 3.841 to $1.00. All debt has been issued in Israeli currency (NIS)

linked to CPI.

3. The mezzanine financing agreement also includes a Tranche C, pursuant to which up to NIS 350 million, at an interest rate of 11% per annum, may be drawn, subject to certain conditions, and only

4.

5.

to cover shortfall amounts.
Includes 275 million Guatemalan Quetzales, the aggregate principal amount of Guatemalan Quetzales-denominated loans outstanding under the syndicated loan facility, converted into U.S. Dollars
at the exchange rate for Guatemalan Quetzales into U.S. Dollars of 7.52 to $1.00 as reported by the Central Bank of Guatemala on December 31, 2016.
Includes 383 million Guatemalan Quetzales, the aggregate principal amount of Guatemalan Quetzales-denominated loans outstanding under the syndicated loan facility, converted into U.S. Dollars
at the exchange rate for Guatemalan Quetzales into U.S. Dollars of 7.52 to $1.00 as reported by the Central Bank of Guatemala on December 31, 2016.

Some of the debt instruments to which IC Power’s operating companies are party require that Inkia, Kallpa, OPC-Rotem, COBEE, CEPP and JPPC comply with financial covenants, semi-

annually or quarterly. Under each of these debt instruments, the creditor has the right to accelerate the debt or restrict the company from declaring and paying dividends if, at the end of any applicable
period the applicable entity is not in compliance with the defined financial covenants ratios.

The instruments governing a substantial portion of the indebtedness of IC Power operating companies contain clauses that would prohibit these companies from paying dividends or making

other distributions in the event that the relevant entity was in default on its obligations under the relevant instrument.

As of December 31, 2016, the Las Flores plant, which is under leasing agreements with a financial institution, was pledged as security for the financing agreements to which Kallpa is a party.

218

 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
        
 
  
 
 
 
  
 
 
 
  
  
 
  
 
  
        
 
  
 
 
 
 
  
 
 
 
 
  
 
 
 
  
 
 
 
  
  
 
  
 
  
        
 
  
 
 
  
  
 
  
 
  
        
 
  
 
 
 
 
 
  
  
 
  
 
  
        
 
  
 
 
  
  
 
  
 
  
        
 
  
 
 
  
  
 
  
 
  
        
 
  
 
 
 
  
 
 
 
  
  
 
  
 
  
          
 
  
 
  
 
  
      
 
 
 
 
 
In addition, all of the assets of Kanan have been pledged as security for the credit facility to which Kanan is a party.

IC Power has entered into hedging arrangements with respect to a portion of IC Power’s long term debt, swapping variable interest for fixed rate interest.

Inkia Notes

In April 2011, Inkia issued and sold $300 million aggregate principal amount of its 8.375% Senior Notes due 2021, which are listed on the Global Exchange Market of the Irish Stock Exchange.

Interest on these notes is payable semi-annually in arrears in April and October of each year and these notes mature in April 2021. Inkia used the net proceeds of the sale of these notes to finance a
portion of its equity contributions to CDA, to repurchase all of its secured indebtedness, and for working capital and general corporate purposes.

In September 2013, Inkia issued and sold $150 million aggregate principal amount of its 8.375% Senior Notes due 2021, which constituted additional notes under the indenture governing the

8.375% Senior Notes due 2021 issued in 2011. Inkia used the net proceeds of the sale of these notes to fund its projects under construction, both through greenfield projects and acquisitions, and for
working capital and general corporate purposes.

In September 2014, Inkia received the requisite consents necessary to amend the indenture governing its 8.375% Senior Notes due 2021 in connection with (1) the contribution by Inkia’s former

parent company, IC, of certain of its businesses and associated companies, including Inkia, to Kenon, thereby permitting the spin-off of Kenon from IC in January 2015 without requiring a change of
control offer to be made to holders of the notes, and (2) the sale by Inkia of all its equity interests in Acter Holdings, which indirectly held all of Inkia’s equity interest in Enel Generación Perú, to Enersis
S.A. and the repayment of certain indebtedness in connection therewith, which amended the asset sale covenant to require that Inkia apply the net proceeds received from such sale within 30 months of
Inkia’s receipt of such net proceeds (i.e., prior to March 2017).

As of December 31, 2016, the aggregate principal amount outstanding under these notes, including a premium, was $457 million ($448 million net of transaction costs).

OPC-Rotem Financing Agreement

In January 2011, OPC-Rotem entered into a financing agreement with a consortium of lenders led by Bank Leumi Le-Israel Ltd., or Bank Leumi, for the financing of its power plant project. As

part of the financing agreement, the lenders committed to provide OPC-Rotem a long-term credit facility (including a facility for variances in the construction costs), a working capital facility, and a
facility for financing the debt service, in the overall amount of NIS 1,800 million (approximately $460 million). As part of the financing agreement, certain restrictions were provided with respect to
distributions of dividends and repayments of shareholders’ loans, commencing from the third year after the completion of OPC-Rotem’s power plant. In October 2015, OPC-Rotem and the consortium of
lenders agreed to shorten the “lock-up period” (which restricted the payment of dividends and any type of distributions until the third anniversary of the completion of the OPC-Rotem plant’s
construction) from December 31, 2016 to June 30, 2015. The loans are CPI-linked and are repayable on a quarterly basis beginning in the fourth quarter of 2013 until 2031.

IC Power has provided a guarantee to the lending consortium and holds cash collateral available for the benefit of the lending consortium. As of December 31, 2016, the outstanding amount of

the loan is NIS 1,409 million (approximately $365 million).

ICPDH Credit Agreement

In December 2015, IC Power, through its subsidiary ICPDH entered into a credit agreement with Credit Suisse AG for $120 million to finance its acquisition of Energuate and two smaller
related companies. The loan is guaranteed by Inkia and fully secured by a pledge provided by ICPDH, which indirectly holds IC Power’s interests in Energuate, RECSA and Guatemel. The pledged
property includes ICPDH’s indirect equity interests in Energuate, RECSA and Guatemel.

The loan will accrue interest at a rate per annum of LIBOR + 4.00%, and matures on June 29, 2017. As of December 31, 2016, the aggregate principal amount outstanding under this facility was

$120 million ($119 million net of transaction costs).

ICPI Mezzanine Financing Agreement

In June 2014, IC Power, through IC Power’s subsidiary ICPI, entered into a mezzanine financing agreement for NIS 350 million (approximately $93 million) to repay capital notes owed to IC.

The agreement was entered into with Mivtachim the Workers Social Insurance Fund and Makefet Fund Pension and Provident Center. The loan is secured by all of ICPI’s assets (excluding the assets that
are pledged to secure certain senior debt) and the free cash flow deriving from OPC-Rotem and is composed of three facilities: Facility A for NIS 150 million (approximately $40 million), which was
fully repaid in January 2016, Facility B for NIS 200 million, and Facility C (only to cover shortfall amounts) for NIS 350 million (approximately $93 million). Facility C has not been used. All facilities
are CPI-linked.

219

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The principal of Facility B Loan will bear interest at a rate of 7.75% per year and accrue bi-annually. Principal and any linkage differentials thereon shall be paid in consecutive equal bi-annual
installments until March 31, 2029, commencing on the earlier of: (i) the final maturity date of Facility A and (ii) the first anniversary after the end of OPC-Rotem’s “lock-up period.” As of December 31,
2016, the aggregate principal amount outstanding under these facilities was $52 million.

CDA Finance Facility

In August 2012, CDA, as borrower, Sumitomo Mitsui Banking Corporation, as administrative agent, certain financial institutions, as lenders, and other parties thereto, entered into a senior
secured syndicated credit facility in an aggregate principal amount not to exceed $591 million to finance the construction of CDA’s plant. Loans under this facility were disbursed in three tranches.

Tranche A loans under this facility, in an aggregate principal amount of up to $342 million, initially bear interest at the rate of LIBOR plus 4.25% per annum, increasing over time beginning on

the date after the interest payment date occurring after August 2017 to LIBOR plus 5.50% per annum. Principal of the Tranche A loans will be payable in 33 quarterly installments commencing on the
first quarterly payment date occurring after the project acceptance by CDA. Tranche A loans will be guaranteed by Corporación Financiera de Desarollo S.A., or COFIDE.

Tranche B loans under this facility, in an aggregate principal amount of up to $184 million, initially bear interest at the rate of LIBOR plus 4.25% per annum, increasing over time beginning on

the date after the interest payment date occurring after August 2017 to LIBOR plus 6.25% per annum. Principal of the Tranche B loans will be payable in August 2024. Tranche B loans will be will be
guaranteed by COFIDE.

Tranche D loans under this facility, in an aggregate principal amount of up to $65 million, initially bear interest at the rate of LIBOR plus 2.75% per annum, increasing over time beginning on
the date after the interest payment date occurring after August 2017 to LIBOR plus 3.60% per annum. Principal of the Tranche D loans will be payable in 45 quarterly installments commencing on the
first quarterly payment date occurring after the project acceptance by CDA. Tranche D loans will be secured by a credit insurance policy provided by SACE S.p.A.—Servizi Assicurativi del Commercio
Estero.

All loans under this facility are secured by:

·

·

pledges of CDA’s movable assets and offshore and onshore collateral accounts;

a pledge of 100% of the equity interests in CDA;

· mortgages of the CDA plant and CDA’s generation and transmission concessions;

·

·

a collateral assignment of insurances and reinsurances in respect of CDA; and

a conditional assignment of CDA’s rights under certain contracts, including the CDA EPC contract and CDA’s PPAs.

In connection with the January 2015 spin-off of Kenon from IC, IC Power replaced the guarantee previously provided by IC to the syndicate of lenders with a guarantee from IC Power to the

syndicate of lenders. As of December 31, 2016, the aggregate principal amount outstanding under this facility was $587 million ($579 million net of transaction costs).

Samay I Finance Facility

In December 2014, Samay I entered into a $311 million, seven-year syndicated secured loan agreement with a syndicate including The Bank of Tokyo-Mitsubishi, as administrative agent, and
certain financial institutions, as lenders, and other parties thereto, or the Samay I Finance Facility, to build an open-cycle diesel and natural gas (dual-fired) thermoelectric plant in Mollendo, Arequipa
(southern Peru). The loan will initially bear interest at a rate of LIBOR plus 2.125% per annum, increasing to LIBOR plus 2.375% per annum beginning on the date after the interest payment date
occurring at the end of 2017 and increasing further to LIBOR plus 2.625% per annum from the date after the interest payment date occurring at the end of 2020 through maturity; 29% of the total
principal is payable in 23 quarterly payments commencing in July 2016; the other 71% of the total principal is payable at maturity. As of December 31, 2016, the aggregate principal amount outstanding
under this facility was $311 million ($307 million net of transaction costs). Loans under this facility are secured by pledges of Samay I’s movable assets and onshore collateral accounts; a pledge over
100% of the equity interests in Samay I; mortgages of the Samay I real estate property, plant and generation and transmission concessions; collateral assignments of insurances and reinsurances in
respect of Samay I; a conditional assignment of Samay I rights under certain contracts, including Samay I’s EPC contract; and trust agreement over certain cash flows of Samay I.

220

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Las Flores Lease

In April 2014, Kallpa entered into a capital lease agreement with Banco de Crédito del Perú under which the lessor provided financing for the acquisition of Las Flores from Duke Energy Corp.

in an aggregate amount of $108 million. Under this lease agreement, Kallpa will make quarterly payments to the lessors through the expiration of this lease in October 2023. As of December 31, 2016,
the aggregate principal amount outstanding under the Kallpa lease is $88 million.

Kallpa Notes Due 2026

In May 2016, Kallpa issued $350 million 4.875% senior unsecured notes due May 24, 2026. The proceeds of the notes were principally used to repay all of Kallpa’s outstanding debt in May

2016, other than debt relating to the Las Flores lease. The remainder of the proceeds were used for general corporate purposes. Interest on these notes is payable in arrears in May and November of each
year. Principal will be fully paid at maturity.

As of December 31, 2016, the outstanding amount of these notes was $350 million ($326 million net of transaction costs).

Overseas Facility

In May 2016, OIP, a wholly-owned subsidiary of IC Power, entered into a $100 million loan agreement, or the Overseas Facility, with Credit Suisse and the Bank of Nova Scotia. The Overseas

Facility is guaranteed by IC Power and ICP and secured by shares of Inkia. The Overseas Facility includes a mandatory prepayment provision in the event of an IC Power initial public offering, upon
which payment the pledge will be released. The Overseas Facility will mature on November 9, 2017 and bears interest as follows:

·

·

·

90-day LIBOR plus 5.00% (for the period from the funding date to the 6-month anniversary of the funding date);

90-day LIBOR plus 5.75% (for the period from one day after the 6-month anniversary of the funding date to the 12 month anniversary of the funding date); and

90-day LIBOR plus 6.50% for any period thereafter.

The Overseas Facility was fully drawn on August 31, 2016. Pursuant to the Overseas Facility, in October 2016, IC Power fully repaid all its obligations under its $75 million note payable to

Kenon. In addition, the Overseas Facility provides that IC Power may make further payments of no more than $75 million to Kenon. For further information on IC Power’s $220 million of notes payable
to Kenon, see “ —Debt Owed to Kenon from Subsidiaries—$220 Million of Notes from IC Power. ”

As of December 31, 2016, the outstanding amount of this facility was $100 million ($97 million net of transaction costs).

COBEE Bonds

COBEE III Bonds . In February 2010, COBEE approved a bond program under which COBEE is permitted to offer bonds in aggregate principal amount of up to $40 million in multiple series.

In March 2010, COBEE issued and sold three series of notes in the aggregate principal amount of $14 million. The aggregate gross proceeds of these notes, which were issued at a premium, were $17
million. COBEE amortizes the premium of these notes over the respective terms of these notes, reducing the interest expense related to these notes. The Series A Notes, in the aggregate principal amount
of $4 million, mature in February 2014. The Series B Notes, in the aggregate principal amount of $4 million, pay interest semi-annually at the rate of 6.50% per annum through maturity in February
2017. Principal on these notes will be paid in two equal annual installments commencing in February 2016. The Series C Notes, in the principal amount of Bs.44.2 million (approximately $6 million),
pay interest semi-annually at the rate of 9.00% per annum through maturity in January 2020. Principal on these notes will be paid in four equal annual installments commencing in February 2017.

In April 2012, COBEE issued and sold two additional series of notes in the aggregate principal amount of $11 million. The aggregate gross proceeds of these notes, which were issued at a

premium, were $13 million. COBEE amortizes the premium of these notes over the respective terms of these notes, reducing the interest expense related to these notes. The first series of these notes, in
the aggregate principal amount of $5 million pays interest semi-annually at the rate of 6.75% per annum through maturity in March 2017. Principal on these notes is payable at maturity. The second
series of these notes, in the aggregate principal amount of Bs.43 million (approximately $6 million), pays interest semi-annually at the rate of 7% per annum through maturity in February 2022. As of
December 31, 2016, the outstanding amount of these notes was $20 million (excluding a $1 million premium).

COBEE IV Bonds . In May 2013, COBEE approved a bond program under which COBEE is permitted to offer bonds in aggregate principal amount of up to $60 million in multiple series. In
February 2014, COBEE issued and sold three series of notes in the aggregate principal amount of $20 million. The aggregate gross proceeds of these notes, which were issued at a premium, were $21
million. The Series A Notes, in the aggregate principal amount of $4 million pay interest semi-annually at the rate of 6.0% per annum through maturity in January 2018. Principal on the Series A Notes
is payable at maturity. The Series B Notes, in the aggregate principal amount of $4 million pay interest semi-annually at the rate of 7.0% per annum through maturity in January 2020. Principal on the
Series B Notes will be paid in four equal semi-annual installments commencing in July 2018. The Series C Notes, in the aggregate principal amount of Bs. 84 million (approximately $12 million) pay
interest semi-annually at the rate of 7.8% per annum through maturity in January 2024. Principal on the Series C Notes will be paid in eight semi-annual installments commencing in July 2020.

221

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In November 2014, COBEE issued and sold two series of notes in the aggregate principal amount of $20 million. The aggregate gross proceeds of these notes, which were issued at a premium,

were $22 million. The first series of these notes, in the aggregate principal amount of $5 million, pays interest semi-annually at the rate of 6.70% per annum through maturity in October 2019. The
second series of these notes in the aggregate principal amount of Bs.105 million (approximately $15 million), pays interest semi-annually at the rate of 7.80% per annum through maturity in October
2024. As of December 31, 2016, the outstanding amount of these notes was $60 million (excluding a $4 million premium).

CEPP Bonds

In November 2013, CEPP approved a program bond offering under which CEPP is permitted to offer bonds in aggregate principal amount of up to $25 million in multiple series. During the first
quarter of 2014, CEPP issued $25 million of its 6.00% bonds due in January and March 2019. Part of these funds were used to prepay $15 million of its 7.75% bonds outstanding due in May 2014. As of
December 31, 2016, the aggregate principal amount outstanding under these bonds was $10 million.

Central Cardones

In connection with IC Power’s acquisition of Central Cardones in December 2011, IC Power consolidated the amounts outstanding under Central Cardones’ credit agreement entered with

Banco de Crédito e Inversiones and Banco Itaú Chile. The loans under this credit agreement were issued in two tranches of $37 million and $21 million, respectively. Loans under the first tranche bear
interest at the rate of LIBOR plus 1.9% per annum, and the principal of this tranche is payable in 24 semi-annual installments through maturity in August 2021. Loans under the second tranche bear
interest at the rate of LIBOR plus 2.75% per annum, interest is payable semi-annually and the principal is payable at maturity, and the loan matures in August 2019. As of December 31, 2016, the
aggregate principal amount outstanding under these loans was $35 million.

Colmito

In January 2014, Colmito entered into a 12,579 million Chilean pesos (approximately $23 million) 14-year credit agreement with Banco Bice. The loan under this facility bears interest at a rate

of 7.9% Chilean pesos per annum and is paid semi-annually through maturity in December 2028. Principal on this facility is payable semi-annually. In February 2014, Colmito entered into a cross-
currency swap closing at a fixed interest rate of 6.025% in U.S. Dollars. As of December 31, 2016, the aggregate principal amount outstanding under this loan was 11,211 million Chilean pesos
(approximately $17 million).

JPPC

In March 2012, JPPC entered into a five-year $21 million syndicated loan agreement with RBC Royal Bank (Trinidad and Tobago) Limited, RBC Royal Bank (Jamaica) Limited and RBC
Merchant Bank (Caribbean) Limited. The loan under this facility bears interest at a rate of LIBOR + 5.5% per annum and is payable in quarterly installments. Principal on this facility is payable in
quarterly payments. JPPC entered into an interest rate swap contract to fix its interest at a rate of 6.46% per annum. As of December 31, 2016, the aggregate principal amount outstanding under this loan
was $1 million (excluding transaction costs).

ICPNH

In October 2007, Amayo I entered into a 15-year $71 million loan agreement with Banco Centroamericano de Integración Económica, or CABEI. The term loan is secured by a first degree

mortgage over all of the improvements executed on Amayo I’s project site, cessation of all of the project contracts, and the creation and maintenance of a reserve account for $2 million, to be controlled
by CABEI. The loans under this facility bear interest at a rate of 8.45% or LIBOR + 4.00% per annum and are payable in quarterly installments.

In November 2010, Amayo II entered into a 15-year $45 million syndicated loan agreement with Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO) and CABEI.
The syndicated loan is secured by a first and second lien mortgage agreement, a first and second lien industrial pledge agreement, and a first and second lien contract pledge agreement. The loans under
this facility bears interest at a rate of 10.76% (Mezzanine Loan), 8.53% (FMO Senior Loan) and a variable interest rate of LIBOR + 5.75% per annum and are payable in quarterly installments.

222

 
 
 
 
 
 
 
 
 
 
 
 
In November 2013 and November 2014, Tipitapa Power entered into a five-year $7 million loan agreement and a four-year $5 million loan agreement, respectively, with Banco de América

Central, or BAC. The term loans are secured by a commercial lien, industrial lien and a mortgage on the property. The loans under this facility bear interest at a rate of 8.35% and are payable in quarterly
installments.

In December 2013, Corinto entered into a five-year $15 million loan agreement with BAC. The term loan is secured by a commercial lien and a mortgage on the barge Margarita II. The loan

under this facility bears interest at a rate of 8.35% and is payable in quarterly installments.

As of December 31, 2016, the aggregate principal amount outstanding under these loans was $87 million.

Kanan Credit Facility

In May 2016, Kanan entered into a $55 million credit facility due 2021, or the Kanan Credit Facility. The Kanan Credit Facility replaced a short-term bridge loan from the Bank of Nova Scotia,

which Kanan entered into in January 2016 to repay $50 million of an intercompany loan, reimburse costs and expenses incurred in connection with the Kanan project and purchase fuel, raw materials
and other expenses. The Kanan Credit Facility bears interest on a quarterly basis at LIBOR + 3.00%. Scheduled amortizations of principal are payable quarterly commencing in June 2016 through
maturity in March 2021. The Kanan Credit Facility is secured by all of Kanan’s assets. As of December 31, 2016, the outstanding amount of the Kanan Credit Facility is $46 million.

DEORSA Syndicated Loan Facility

In May 2011, DEORSA entered into a 10-year syndicated secured loan agreement providing for borrowings of up to $41 million and $90 million with a syndicate including Banco

Agromercantil de Guatemala, S.A., as the manager of the guarantee and administrative agent, and certain financial institutions, as lenders, and other parties thereto, to finance the acquisition of DEORSA
by its prior owner, to refinance DEORSA’s existing indebtedness as of the closing date of the acquisition, and to finance DEORSA’s working capital requirements. Loans under this loan agreement are
secured by a pledge over DEORSA’s shares and a $41 million guarantee from DEORSA. The U.S. Dollar-denominated loans under this agreement bear interest at a fixed rate of 6.00% for the first two
years and at a rate of 90-day US LIBOR plus 4.70% per annum through maturity on May 19, 2021. Guatemalan Quetzales-denominated loans under this agreement bear interest at a variable interest rate
calculated by the weighted average rate (TASA Activa Promedio Ponderada), or TAPP rate, as published by the Guatemalan Central Bank (Banco de Guatemala) for the most recent date as of the first
day of the relevant interest period, less 5.6%, per annum. Scheduled amortizations of the aggregate principal amount outstanding under this agreement (generally 2.81%) are payable in quarterly
installments through maturity.

In May 2011, in connection with and pursuant to the terms of DEORSA’s syndicated loan agreement, DEORSA entered into an account trust agreement with Financiera Agromercantil,
Sociedad Anonima, as collateral agent, pursuant to which the collateral agent is empowered, upon an event of default under the syndicated loan agreement, to take control of and manage certain accounts
of DEORSA in order to make payments to the administrative agent in accordance with the terms of the syndicated loan agreement.

In April 2015, the loan agreement was amended and restated and, in accordance therewith, the amounts available under the facility were increased by $37 million and $21 million to fund,

among other things, DEORSA’s operating and investment activities, repayment of certain outstanding indebtedness, and general corporate purposes. The additional $21 million facility is also secured by
pledged collateral and a $9 million guarantee from DEORSA. The U.S. Dollar-denominated loans under the additional facility bear interest at a rate of 90-day US LIBOR plus 4.70% per annum (with a
floor rate of 5.90%) for the first year and at a rate of 90-day US LIBOR plus 4.75% per annum (with a floor rate of 6.0%) through maturity on February 19, 2025. Guatemalan Quetzales-denominated
loans under the additional facility bears interest at a variable interest rate calculated by the weighted average rate (TASA Activa Promedio Ponderada), as published by the Guatemalan Central Bank for
the most recent date as of the first day of the relevant interest period, less 6.10%, per annum. Scheduled amortizations of the aggregate principal amount outstanding under the additional facility are
payable in quarterly installments commencing in May 2018 through maturity.

In August 2016, DEORSA entered into an addendum to the loan agreement, which renewed two tranches under the loan agreement which had expired. The amounts available under the facility

were increased by $16 million. The U.S. Dollar-denominated loan under the additional facility bears interest at a rate of LIBOR + 4.75% (with a floor rate of 6.00%). The Guatemalan Quetzales-
denominated loan under the additional facility bears interest at a rate of the TAPP rate less 6.10%. Scheduled amortizations of the aggregate principal amount under the additional facility are payable in
quarterly instalments commencing in May 2018 through maturity in February 2025. In August 2016, DEORSA drew down this additional $16 million under the DEORSA syndicated loan facility in
order to make payments to the SAT in connection with tax claims raised by the SAT against Energuate in July 2016. For further information on the Energuate tax claims, see “ Item 4.B Business
Overview—Our Businesses—IC Power—Legal Proceedings—Energuate Tax Claims .”

As of December 31, 2016, the aggregate principal amount outstanding under the syndicated loan facility was $113 million.

223

 
 
 
 
 
 
 
 
 
 
 
DEOCSA Syndicated Loan Facility

In May 2011, DEOCSA entered into a 10-year syndicated secured loan agreement providing for borrowings of up to $54 million and $150 million with a syndicate including Banco

Agromercantil de Guatemala, S.A., as the manager of the guarantee and administrative agent, and certain financial institutions, as lenders, and other parties thereto, to finance the acquisition of DEOCSA
by its previous owner, to refinance DEOCSA’s existing indebtedness as of the closing date of the acquisition, and to finance DEOCSA’s working capital requirements. Loans under this loan agreement
are secured by a pledge over DEOCSA’s shares and a $55 million guarantee from DEOCSA. The U.S. Dollar-denominated loans under this agreement bear interest at a fixed rate of 6.00% for the first
two years and at a rate of 90-day US LIBOR plus 4.70% per annum through maturity on May 19, 2021. Guatemalan Quetzales-denominated loans under this agreement bear interest at a variable interest
rate calculated by the TAPP rate, as published by the Guatemalan Central Bank for the most recent date as of the first day of the relevant interest period, less 5.6%, per annum. Scheduled amortizations
of the aggregate principal amount outstanding under this agreement (generally 2.81%) are payable in quarterly installments through maturity.

In May 2011, in connection with and pursuant to the terms of DEOCSA’s syndicated loan agreement, DEOCSA entered into an account trust agreement with Financiera Agromercantil,
Sociedad Anonima, as collateral agent, pursuant to which the collateral agent is empowered, upon an event of default under the syndicated loan agreement, to take control of and manage certain accounts
of DEOCSA in order to make payments to the administrative agent in accordance with the terms of the syndicated loan agreement.

In April 2015, the loan agreement was amended and restated and, in accordance therewith, the amounts available under the facility were increased by $51 million and $32 million to fund,

among other things, DEOCSA’s operating and investment activities, repayment of certain outstanding indebtedness, and general corporate purposes. The additional $32 million facility is also secured by
pledged collateral and a 105 thousand Guatemalan Quetzales (approximately $14 thousand) guarantee from DEOCSA. The U.S. Dollar-denominated loans under the additional facility bears interest at a
rate of 90-day US LIBOR plus 4.70% per annum (with a floor rate of 5.90%) for the first year and at a rate of 90-day US LIBOR plus 4.75% per annum (with a floor rate of 6.0%) through maturity on
February 19, 2025. Guatemalan Quetzales-denominated loans under the additional facility bear interest at a variable interest rate calculated by the weighted average rate (TASA Activa Promedio
Ponderada), as published by the Guatemalan Central Bank) for the most recent date as of the first day of the relevant interest period, less 6.10%, per annum. Scheduled amortizations of the aggregate
principal amount outstanding under the additional facility are payable in quarterly installments commencing in May 2018 through maturity.

In August 2016, DEOCSA entered into an addendum to the loan agreement, which renewed two tranches under the loan agreement which had expired. The amounts available under the facility

were increased by $24 million. The U.S. Dollar-denominated loan under the additional facility bears interest at a rate of LIBOR + 4.75% (with a floor rate of 6.00%). The Guatemalan Quetzales-
denominated loan under the additional facility bears interest at a rate of the TAPP rate less 6.10%. Scheduled amortizations of the aggregate principal amount under the additional facility are payable in
quarterly instalments commencing in May 2018 through maturity in February 2025. In August 2016, DEOCSA drew down this additional $24 million under the DEOCSA syndicated loan facility in
order to make payments to the SAT in connection with tax claims raised by the SAT against Energuate in July 2016. For further information on the Energuate tax claims, see “ Item 4.B Business
Overview—Our Businesses—IC Power—Legal Proceedings—Energuate Tax Claims .”

As of December 31, 2016, the aggregate principal amount outstanding under the syndicated loan facility was $174 million.

OPC-Hadera Financing

In July 2016, OPC-Hadera entered into a NIS 1 billion (approximately $261 million) loan agreement with Israel Discount Bank and Harel Insurance Group to finance the construction of OPC-
Hadera’s power plant in Hadera. The financing will mature 18 years after the completion of the construction period, and includes a term loan facility, a standby facility, a debt service reserve amount, or
DSRA, facility to finance the DSRA deposit, a guarantee facility to facilitate the issuance of bank guarantees to be issued to third parties, a VAT facility (for the construction period only), a hedging
facility (for the construction period only), and a working capital facility (for the operation period only).

The term loan, standby, DSRA, and hedging facilities shall each bear interest at a rate of 2/3 Government CPI-linked Bond + 2.95% + 1/3 Government Bond + 2.95% per annum. The

guarantees, VAT and working capital facilities shall each bear interest at a rate of the prime interest rate + 1.5% per annum. These terms are subject to OPC-Hadera’s credit rating.

As of December 31, 2016, OPC-Hadera had not made drawings under this loan agreement.

In March 2017, following the full investment of the project’s equity contribution, OPC-Hadera made its first drawings under the NIS 1 billion (approximately $261 million) loan agreement

relating to the project.

224

 
 
 
 
 
 
 
 
 
 
 
Short-Term Loans

IC Power’s consolidated short term debt was $482 million (including $269 million of the current portion of long-term debt) as of December 31, 2016.

CEPP, COBEE, Puerto Quetzal, Samay I, CDA, Surpetroil, Corinto, Nejapa, DEORSA, DEOCSA, and Distribution Holdings have borrowed under short-term lines of credit with financial
institutions in the Dominican Republic, Bolivia, Guatemala, Peru, Peru, Colombia, Nicaragua, El Salvador, Guatemala, Guatemala, and Singapore, respectively, under which they have borrowed $1
million, $4 million, $6 million, $32 million, $14 million, $1 million, $2 million, $4 million, $12 million, $18 million, and $120 million, respectively as of December 31, 2016. These short-term
borrowings are primarily used to finance these businesses' respective operating activities.

Qoros’ Liquidity and Capital Resources

Qoros’ cash and cash equivalents was RMB465 million as of December 31, 2016, compared to approximately RMB257 million as of December 31, 2015. We have a 50% equity interest in

Qoros and, and we do not exercise control over Qoros’ cash and cash equivalents.

Qoros’ principal sources of liquidity are cash inflows received from financing activities, including long-term loans, short-term facilities and capital contributions (in the form of equity
contributions, or convertible or non-convertible shareholder loans), and cash flows from car sales. Qoros has fully utilized its RMB3 billion syndicated credit facility, RMB1.2 billion syndicated credit
facility and its RMB700 million credit facility, and will require additional financing, including the renewal or refinancing of its working capital facilities, to fund its development and operations.

Qoros has historically relied upon capital contributions, loans, guarantees and pledges from its shareholders (Chery and Kenon), and third party loans supported by its shareholders, to fund its
development and operations. As of the date of this annual report, Qoros’ shareholders have made equity contributions in the aggregate amount of RMB10.4 billion and loans in the amount of RMB1.8
billion (including loans of RMB450 million from Ansonia to Quantum used to make back-to-back loans in the same amount to Qoros). In 2016, Qoros' shareholders each made shareholder loans to
Qoros as follows:

·

·

·

in January and February 2016, Kenon made loans to Qoros of RMB275 million, using cash on hand and drawdowns under the IC Credit Facility; Chery provided RMB275 million
shareholder loans on similar conditions as well;

in May, June and September 2016, Ansonia, which owns approximately 58% of the outstanding shares of Kenon, provided our wholly-owned subsidiary Quantum with loans of
approximately $72 million, which Quantum used to make back-to-back loans to Qoros in an aggregate principal amount of RMB450 million. Wuhu Chery provided loans to Qoros in the
same amount. Kenon did not make any loans or other investments in Qoros as part of these transactions; and

in December 2016, Kenon and Chery each provided shareholder loans of RMB250 million to Qoros. In addition, in connection with these shareholder loans, Kenon’s major shareholder
Ansonia committed to fund RMB25 million of Kenon’s remaining back-to-back guarantee obligations to Chery in certain circumstances. As a result, the maximum amount of Kenon’s
exposure with respect to its back-to-back guarantee obligations to Chery was reduced by RMB275 million to RMB825 million.

In March 2017, Kenon agreed to fund shareholder loans of up to RMB777 million to Qoros in two equal tranches. The first tranche of loans were provided to Qoros in March 2017 in the

amount of RMB388.5 million. The proceeds of the first tranche loans will be used to support Qoros’ ordinary course working capital requirements, debt service requirements and investments in new
initiatives, such as new-energy vehicles, while Qoros continues its fund raising efforts. Kenon may fund the provision of the second tranche of loans. For more information see “ —Qoros’ Liquidity and
Capital Resources—Material Indebtedness—Shareholder Loans .”

Qoros is continuing to seek additional financing for its operations. For example, in April 2017, Quantum, Chery and Qoros entered into an agreement with Yibin, pursuant to which Yibin may

invest significant amounts in Qoros, subject to government approval and the execution of amendments to Qoros’ joint venture agreement and articles of association, among other agreements.

As of the date of this annual report, Kenon has outstanding back-to-back guarantees to Chery of up to RMB425 million principal amount of Qoros’ indebtedness, plus certain interest and fees.

For further information on Kenon's back-to-back guarantees with respect to Qoros' bank debt, see “— Kenon's Liquidity and Capital Resources .”

As of December 31, 2016, Qoros had total loans and borrowings (excluding shareholder loans) of RMB5.5 billion and current liabilities (excluding shareholder loans) of RMB4.0 billion,

including trade and other payables of RMB2.7 billion, and current assets of RMB1.8 billion, including cash and cash equivalents of RMB465 million (of which RMB194 million was used in January
2017 in connection with Qoros' payment under its RMB3 billion facility). Qoros uses a portion of its liquidity to make debt service payments, including principal payments on its RMB3 billion facility.
Qoros is currently required to make principal payments on its RMB3 billion facility and will be required to make principal payments on its RMB1.2 billion facility and RMB700 million facility
beginning in August 2017 and May 2018, respectively. Qoros’ lenders have agreed to reschedule principal payments under the RMB3 billion and RMB1.2 billion scheduled to occur in 2017 and 2018,
with principal payments scheduled to occur between 2019 and 2022 (in the case of the RMB3 billion facility) and between 2019 and 2024 (in the case of the RMB1.2 billion facility).

225

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Qoros actively manages its trade payables, accrued expenses and other operating expenses in connection with the management of its liquidity requirements and resources. For further
information on the risks related to the effect of Qoros’ liquidity situation on its relationship with its supplies, see “ Item 3.D. Risk Factors—Risk Factors Related to Our Interest in Qoros — Qoros is
dependent upon its suppliers. ”

Qoros is continuing to experience losses and negative operating cash flow and expects that this will continue until it achieves significantly higher levels of sales. Qoros will need to secure

additional financing to meet its operating expenses (including accounts payable) and debt service requirements. If Qoros is not able to raise additional financing as required, it may be unable to continue
operations, in which case Kenon may lose its entire investment in Qoros and Kenon may be required to make payments under its back-to-back guarantees to Chery in respect of Qoros’ bank debt and
pledges over Qoros shares by Quantum may be enforced.

Alternatively, Chery or other investors, such as Yibin, may choose to make additional investments in Qoros (without a corresponding Kenon investment) which may result in a dilution of
Kenon’s interest. For information on the risks related to Qoros’ liquidity, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros depends on additional financing to further its
development and, until it achieves significant sales levels, to meet its operating expenses, financing expenses, and capital expenditures .”

Qoros’ consolidated financial statements have been prepared on a going concern basis, based upon certain assumptions, including the availability of liquidity and funding for Qoros and Qoros is
of the opinion that the assumptions which are included in the cash flow forecast are reasonable. For further information, see Note 2(b) to Qoros’ consolidated financial statements, included in this annual
report.

Material Indebtedness

As of December 31, 2016, Qoros had total loans and borrowings (excluding shareholder loans) of RMB5.5 billion, consisting of non-current loans and borrowings of RMB4.3 billion and

current loans and borrowings of RMB1.2 billion (excluding shareholder loans). Set forth below is a discussion of Qoros’ material indebtedness.

RMB3 Billion Syndicated Credit Facility

On July 23, 2012, Qoros entered into a consortium financing agreement with a syndicate of banks for the ability to draw down loans, in either RMB or USD, up to an aggregate maximum

principal amount of RMB3 billion. The RMB loans bear interest at the 5-year interest rate quoted by the People’s Bank of China from time to time and the USD loans bear interest at LIBOR + 4.8% per
annum. Outstanding loans are repayable within ten years from July 27, 2012, the first draw down date. The first and second scheduled repayment dates were in July 2015 and January 2016, respectively.
Subsequent repayment dates occur every six months after the preceding repayment date. Qoros’ lenders under this facility have agreed to reschedule principal payments from 2017 and 2018 with
principal payments scheduled to occur between  2019 and 2022.

Qoros’ RMB/USD dual currency fixed rate credit facility is secured by Qoros’ manufacturing facility, the land use right for the premises on which such manufacturing facility is located, and its
equipment, and properties, and several guarantees, including a joint, but not several, guarantee from each of Chery and Changshu Port. Loans under this facility are severally guaranteed by (i) Changshu
Port for up to 50% of amounts outstanding under this loan, or up to RMB1.5 billion, plus related interest and fees and (ii) Chery for up to 50% of amounts outstanding under this loan, or up to RMB1.5
billion, plus related interest and fees. Kenon has outstanding a back-to-back guarantees to Chery of RMB425 million in respect of Chery’s guarantee of this facility. For further information on Kenon’s
back-to-back guarantee obligations to Chery see “— Kenon’s Liquidity and Capital Resources—Kenon’s Commitments and Obligations—Back-to-Back Guarantees Provided to Chery .”

Qoros’ syndicated credit facility contains financial, affirmative and negative covenants, events of default or mandatory prepayments for contractual breaches, including certain changes of

control, and for material mergers and divestments, among other provisions. Although Qoros’ debt-to-asset ratio is currently higher, and its current ratio is lower, than the allowable ratios set forth in the
terms of the syndicated credit facility, in 2014 and 2016, the syndicated consortium of Qoros’ syndicated credit facility waived Qoros’ compliance with the financial covenants under this facility through
the first half of 2017 and the first half of 2020. As a result, Qoros will not be required to comply with these financial covenants until July 2020 (or later, if additional waivers are granted). The waivers
also provide that, after Qoros enters into a continuous and sustained operating period, a request for adjustment of the financial covenants, as necessary, can be submitted to the syndicated loan group or
the lender under the working capital facility, as applicable, for consideration. Should Qoros’ debt-to-asset ratio continue to exceed, or its current ratio continue to be less than, the permitted ratios in any
period after the waiver period, and Qoros’ syndicated lenders do not waive such non-compliance or revise such covenants so as to ensure Qoros’ compliance, Qoros’ lenders could accelerate the
repayment of borrowings due under Qoros’ RMB3 billion syndicated credit facility.

226

 
 
 
 
 
 
 
 
 
 
For further information on the risks related to Qoros’ indebtedness, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is significantly leveraged .”

As of December 31, 2016, the aggregate amount outstanding on this loan was approximately RMB2.8 billion.

RMB1.2 Billion Syndicated Credit Facility

In July 2014, Qoros entered into a consortium financing agreement with a syndicate of banks for the ability to draw loans, in either RMB or USD, up to an aggregate maximum principal amount

of RMB1.2 billion for the research and development of C-platform derivative models. The RMB loans bear interest at the 5-year interest rate quoted by the People’s Bank of China from time to time +
10.0% and the USD loans bear interest at LIBOR + 5.0% per annum. Outstanding loans are repayable within ten years from August 19, 2014, the first draw down date. The first scheduled repayment
date was expected to occur on August 19, 2017 (or 36 months after the first draw down date) with subsequent repayment dates occurring every six months after the preceding repayment date. Qoros’
lenders under this facility have agreed to reschedule principal payments from 2017 and 2018 with principal payments scheduled to occur between 2019 and 2024.

Up to 50% of the indebtedness incurred under this facility is secured by Quantum’s pledge of approximately 23% of the shares in Qoros, including dividends deriving therefrom. Wuhu Chery

has also pledged approximately 23% of the shares in Qoros, including dividends derived therefrom, to secure up to 50% of the indebtedness incurred under this facility. The pledge agreement under
which Quantum has pledged its equity interest in Qoros includes provisions setting forth, among other things, (i) minimum ratios relating to the value of Quantum’s pledged securities, (ii) Quantum’s
ability to replace the pledge of its equity interest in Qoros with a pledge of cash collateral or to pledge cash collateral instead of pledging additional shares, representing up to 100% of Quantum’s equity
interest in Qoros, and (iii) the events (e.g., Qoros’ default under the syndicated facility) that entitle the Chinese bank to enforce its lien on Quantum’s equity interest. In the event that the value of Qoros'
equity decreases and Quantum's shares of Qoros' equity is not sufficient to cover its proportionate stake of the pledge, Quantum has the option to provide additional collateral to secure the RMB1.2
billion facility. However, in the event that Quantum does not provide such additional collateral, the lenders under the facility may be entitled to sell some or all of Quantum's shares in Qoros.

In connection with Kenon's December 2016 shareholder and March 2017 funding of shareholder loans to Qoros, pursuant to which Kenon’s back-to-back guarantee obligations to Chery have
been partially, and may be fully released, Quantum has pledged shares in Qoros to Chery to secure the back-to-back guarantee reductions (i.e., if Chery is required to make payments on its guarantee of
Qoros’ debt, then to the extent that Chery makes payments that would have been reimbursed by Kenon but for the back-to-back guarantee reduction, Chery will be entitled to enforce this pledge). Chery
may also borrow from Quantum up to 10% of Qoros’ outstanding shares to meet its pledge obligations under the RMB1.2 billion credit facility. The number of Qoros shares pledged to Chery is subject
to adjustment from time to time. In certain circumstances, Quantum must pledge additional shares (to the extent it has unencumbered shares), and in other circumstances the pledged shares may be
released and the borrowed shares must be returned (e.g., in the event that Quantum is required to pledge additional shares to secure the RMB1.2 billion credit facility).

The syndicated loan agreement includes covenants (including financial covenants) and events of default and early payment for violation provisions.

For further information on the risks related to Qoros’ indebtedness, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is significantly leveraged .”

As of December 31, 2016, the aggregate principal amount outstanding on this loan was approximately RMB1.2 billion.

RMB700 Million Syndicated Credit Facility

In May 2015, Qoros entered into a RMB700 million facility with a bank consortium for the purpose of research and development into a hybrid electric vehicle. Under the facility, Qoros can

draw down loans in either RMB or USD, up to an aggregate principal amount of RMB700 million. The loan agreement covers a period of 102 months starting in May 2015, and is secured by a guarantee
by Chery and a pledge over Qoros’ 90 vehicle patents. The RMB loan bears the 5-year interest rate quoted by the People’s Bank of China +10%, and the USD loan bears interest of LIBOR+3.5% per
annum.

The RMB700 million is guaranteed by Chery. We provided a back-to-back guarantee to Chery in respect of this facility. For further information on Kenon’s back-to-back guarantee obligations

to Chery, see “— Kenon’s Liquidity and Capital Resources—Kenon’s Commitments and Obligations—Back-to-Back Guarantees Provided to Chery. ”

As of December 31, 2016, Qoros drew down a total of RMB700 million. The facility includes covenants and event of default provisions.

227

 
 
 
 
 
 
 
 
 
 
 
 
 
As of December 31, 2016, the aggregate principal amount outstanding on this loan was approximately RMB700 million.

For further information on the risks related to Qoros’ indebtedness, see “ Item 3.D Risk Factors—Risks Related to Our Interest in Qoros—Qoros is significantly leveraged .”

Working Capital Facilities

Qoros is party to various short-term and working capital facilities. As of December 31, 2016, the balance of these facilities was RMB205 million.

Qoros will require additional financing, including the renewal or refinancing of its working capital facilities. If Qoros is unable to renew or refinance its working capital facilities, Qoros may be

unable to meet its operating expenses (including accounts payable) and debt service requirements. For further information on the risks related to Qoros’ liquidity, see “ Item 3.D Risk Factors—Risks
Related to Our Interest in Qoros—Qoros depends on additional financing to further its development and, until it achieves significant sales levels, to meet its operating expenses, financing expenses, and
capital expenditures .”

Shareholder Loans

As of the date of this annual report, Qoros’ shareholders have provided Qoros with RMB1.8 billion in shareholder loans (including loans of RMB450 million from Ansonia to Quantum used to

make back-to-back loans in the same amount to Qoros). A portion or all these shareholder loans may be converted into equity.

Ansonia and Chery Back-to-Back Loans to Qoros

In May, June and September 2016, Ansonia, which owns approximately 58% of the outstanding shares of Kenon, provided Quantum with loans of approximately $72 million. Quantum used the
proceeds of these loans to make back-to-back loans in an aggregate principal amount of RMB450 million to Qoros to support Qoros’ working capital requirements; Wuhu Chery provided loans to Qoros
in the same amount.

Additionally, Qoros has secured Quantum’s and Wuhu Chery’s loans with a pledge of certain collateral. Quantum has agreed to assign its rights, title and interests in the collateral securing the

Quantum loan to Ansonia. Qoros’ pledge of this collateral will be released upon a conversion of the shareholder loans into equity (as described below) or upon repayment.

In order to facilitate a potential investment by a third party in Qoros, Ansonia’s loans are automatically convertible into equity in Quantum in the event of a third-party financing at Qoros that

meets certain conditions, unless Ansonia’s loans are to be repaid in connection with such third-party financing. The loans that Ansonia made to our subsidiary Quantum (which were used by Quantum to
make back-to-back loans to Qoros) may be converted into equity of Quantum at a discount to the implied value of Qoros based upon the receipt of third-party financing. Upon such conversion, Kenon’s
indirect interest in Qoros will be diluted. After a conversion of Ansonia’s loans into equity in Quantum, and until the third anniversary of such conversion, Ansonia will have the option to convert its
equity holdings in Quantum into an equivalent value of equity holdings in Qoros, subject to the receipt of regulatory approvals, Qoros’ corporate approvals, and Chery’s and Wuhu Chery’s approvals.

Prior to a conversion of Ansonia’s loans into equity in Quantum, the loans can be repaid by Quantum without penalty or premium.

To support Qoros in light of Qoros’ financing needs, Kenon has worked with its major shareholder, Ansonia, to facilitate Ansonia’s provision of loans to Qoros (through Quantum, as described

above).

December 2016 Shareholder Loans to Qoros

In December 2016, Kenon provided a RMB250 million shareholder loan to Qoros, and in connection with this loan from Kenon, the maximum amount of Kenon’s exposure with respect to its

back-to-back guarantee obligations to Chery was reduced by RMB275 million as follows. As part of the loan to Qoros, Kenon’s back-to-back guarantee obligations to Chery with respect to Chery’s
guarantee of Qoros’ RMB3 billion loan facility with the EXIM Bank was reduced from RMB750 million to RMB500 million. In addition, Kenon’s major shareholder Ansonia committed to fund RMB25
million of Kenon’s remaining back-to-back guarantee obligations to Chery in certain circumstances.

In connection with Kenon’s loan to Qoros, Chery also agreed to make a corresponding RMB250 million loan to Qoros. The proceeds of these loans were used to support Qoros’ ordinary course

working capital requirements and Qoros’ investments in new initiatives, such as new-energy vehicles, while it continues its fund raising efforts.

As part of this transaction, Quantum pledged approximately 6% of the shares in Qoros to Chery to secure the back-to-back guarantee reduction of RMB250 million (i.e., if Chery is required to

make payments on its guarantee of Qoros’ debt, then to the extent that Chery makes payments that would have been reimbursed by Kenon but for the back-to-back guarantee reduction, Chery will be
entitled to enforce this pledge). Chery may also borrow from Quantum up to 5% of Qoros’ outstanding shares to meet its pledge obligations under the RMB1.2 billion credit facility. The number of
Qoros shares pledged to Chery is subject to adjustment from time to time. In certain circumstances, Quantum must pledge additional shares (to the extent it has unencumbered shares), and in other
circumstances the pledged shares may be released and the borrowed shares must be returned (e.g., in the event that Quantum is required to pledge additional shares to secure the RMB1.2 billion credit
facility).

228

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
March 2017 Shareholder Loans to Qoros

In March 2017, Kenon agreed to fund shareholder loans of up to RMB777 million to Qoros in two equal tranches in connection with the full release of its remaining back-to-back guarantee

obligations (plus related interest and fees) to Chery.

In March 2017, Kenon funded shareholder loans of RMB388.5 million to Qoros in connection with a reduction of RMB425 million of Kenon’s back-to-back guarantees, together with related
interest and fees. As part of this first tranche loans to Qoros, Kenon funded 50% of this amount on behalf of Chery in connection with 50% of the guarantee reduction discussed above and 50% of this
amount on behalf of Kenon. Kenon also pledged Qoros shares to Chery (as discussed below) in connection with the remaining 50% of the guarantee reduction.

Should the second tranche of loans be provided, they are expected to be made on substantially similar terms to the first tranche loans. Kenon’s remaining back-to-back guarantee obligations to

Chery will be fully released upon its provision of the second tranche loans.

In the event that Chery’s obligations under its guarantees are reduced, in whole or in part, through amortization of the loans or guarantee releases, Kenon is entitled to the proportionate return

from Chery of the loans provided on Chery’s behalf (i.e., up to RMB388.5 million) or a release of the shares pledged to Chery, as applicable.

Kenon’s subsidiary Quantum has pledged approximately 5% of the outstanding shares in Qoros in connection with the first tranche of loans, and will pledge an additional amount of shares in
connection with its provision of the second tranche of loans. In addition, Chery may also borrow from Quantum 5% of Qoros’ outstanding shares in connection with Kenon’s provision of the first and
second tranche of loans. The number of Qoros shares pledged to Chery which are borrowed from Quantum is subject to adjustment from time to time.

The proceeds of the first tranche of loans was used to support Qoros’ ordinary course working capital requirements, debt service requirements and investments in new initiatives, such as new-

energy vehicles, while Qoros continues its fund raising efforts.

ZIM’s Liquidity and Capital Resources

As of December 31, 2016, ZIM had an aggregate amount of $158 million in cash and cash equivalents, as compared to $219 million of cash and cash equivalents as of December 31, 2015.

During the year ended December 31, 2016, ZIM generated $33 million from operating activities, $142 million from investing activities and used $229 million in financing activities.

ZIM has a large amount of debt and other liabilities. As of December 31, 2016, ZIM had approximately $1.5 billion of outstanding loans and liabilities to be repaid between 2017 through 2028,

of which $45 million constituted short-term debt. On July 16, 2014, ZIM completed its financial restructuring, reducing ZIM’s outstanding indebtedness and liabilities (face value, including future off-
balance sheet commitments in respect of operational leases and with respect to those parties participating in the restructuring) from approximately $3.4 billion to a remaining balance of approximately $2
billion, and revising its minimum liquidity, fixed charge coverage ratio, and total leverage ratio covenants, which were further amended in September 2015, March 2016 and September 2016.

ZIM expects to finance its debt obligations and other liabilities through expected cash flow generation from operating activities, in addition to cash on hand. ZIM may also obtain funds from

additional sources including debt issuance and/or other financing transactions and/or sale of assets and/or fund raising activities, including initial public offerings or listings and/or re-finance its debt
obligations by engaging potential new lenders and existing lenders in order to exchange existing maturities to debt vehicles with longer maturities.

In light of the continued unfavorable container shipping market conditions, ZIM has taken various steps to address its liquidity and financial position. Accordingly, ZIM approached certain of

its creditors to reschedule upcoming payments, and ZIM’s creditors agreed to allow ZIM to defer payments in a total amount of approximately $116 million during a period of up to 12 months from
September 30, 2016. Repayments of the deferred amounts will begin on January 1, 2018, and ZIM secured the deferred amounts with a receivables-backed facility. In addition, the fixed charge cover
ratio and total leverage ratio covenants, which ZIM is subject to pursuant to its July 2014 financial restructuring, have been amended and will be required on March 31, 2018 and thereafter.

229

 
 
 
 
 
 
 
 
 
 
 
 
 
ZIM is continuing to implement its comprehensive strategy that is designed to improve ZIM’s commercial and operational processes, and aims to reduce ZIM’s operational expenses and

improve ZIM’s profitability. However, there is no assurance as to the extent of the effectiveness such activities or when, if at all, the results of such activities will be reflected in ZIM’s liquidity and
capital resources. For further information on the risks related to ZIM’s liquidity, see “ Item 3.D Risk Factors—Risks Related to Our Other Businesses—Risks Related to our Interest in ZIM—ZIM is
highly leveraged and may be unable to comply with its financial covenants or meet its debt service or other obligations. ZIM’s failure to comply with these covenants or meet such obligations, including
as a result of events beyond its control, could adversely affect its business, financial condition, results of operations and liquidity. ”

Primus’ Liquidity and Capital Resources

As of December 31, 2016, Primus had cash and cash equivalents of approximately $0.4 million.

The implementation of Primus’ business plan requires additional capital to enable Primus to continue to develop its commercial operations. Primus expects such funding to be provided by us

either through capital contributions or shareholder loans, or by new investors in Primus. Primus’ principal liquidity requirements relate to its operating expenses and investments in various development
projects. A lack, or delay, of financing could delay, or prevent completely, Primus’ research and commercial development or result in its immediate liquidation or dissolution.

In connection with Primus’ further development and our efforts to maximize its value, we may provide additional capital to Primus, in the form of debt or equity financing, if deemed
appropriate to facilitate Primus’ operational and development capital requirements. Through our wholly-owned subsidiary IC Green, we have provided Primus a total of $26 million (including accrued
interest) via a series of convertible notes through December 31, 2016. In 2017, we provided Primus an additional $3.3 million via convertible notes.

Primus is currently seeking to raise capital from new investors. However, there is no certainty that additional financing will be provided to Primus, either by us or new investors in Primus.

Additionally, should Primus raise capital via equity issuances in the future without Kenon’s participation in such financing, we would experience a dilution in our existing ownership interest.

Material Indebtedness

Primus does not have any material indebtedness, other than related party indebtedness.

C.            Research and Development, Patents and Licenses, Etc.

Kenon did not have significant research and development expenses during the years ended December 31, 2016, 2015 and 2014.

D.            Trend Information

The following key trends contain forward-looking statements and should be read in conjunction with “ Special Note Regarding Forward-Looking Statements ” and “ Item 3.D Risk Factors .”

For further information on the recent developments of Kenon and our businesses, see “ Item 5. Operating and Financial Review and Prospects—Recent Developments. ”

Trend Information

Peru Power Market

As a result of the completion of various plants in Peru in recent years (including Samay I, IC Power’s 632 MW cold-reserve thermoelectric plant that reached COD in May 2016, and CDA, IC
Power’s 545 MW run-of-the-river hydroelectric plant, which reached COD in August 2016), the generation capacity in Peru increased at a faster rate than the demand for such electricity, resulting in an
oversupply of capacity in the Peruvian market and therefore a corresponding downward pressure on energy and capacity prices. IC Power expects this trend in energy prices to continue in the next few
years. IC Power does not have any major PPAs scheduled to expire during 2017. However, for the next few years, IC Power will face the current soft energy price market for any upcoming new PPA
negotiations, renegotiations under existing PPAs and spot market sales.

IC Power’s Peruvian energy and capacity is mainly sold pursuant to long-term PPAs. The counterparties to these PPAs consist primarily of large end users, such as industrial and mining

companies, and distribution companies that aggregate the energy consumption of many end users in each of their concession areas. The current soft energy prices are leading some customers of
distribution companies in Peru that are eligible to purchase energy as unregulated customers to purchase energy directly from power generators (instead of from power distributors). To the extent that
such distribution customers elect to purchase energy directly from power generators, this could result in lower volumes of energy sold under IC Power’s PPAs with distribution companies. In addition, to
the extent these unregulated customers purchase capacity and energy directly from IC Power, the energy prices that it realizes from sales to these customers in the current price environment could be
lower than the prices that IC Power realizes under the PPAs with the power distributors, which could impact IC Power’s margins due to certain large mining and industrial projects.

230

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Currently, no significant new additions of base load units are expected to be completed for the Peruvian system other than those contemplated for 2017 and, as a result, energy prices may

recover progressively over the next few years as the system energy demand increases.

Qoros

For the year ended December 31, 2016, Qoros sold approximately 24,000 vehicles, as compared to approximately 14,000 vehicles in 2015. Qoros expects it will have fewer vehicle sales in Q1

2017 as compared to Q1 2016, in which period Qoros sold approximately 4,900 vehicles. Qoros believes that its sales figures will continue to fluctuate in the near-term.

Qoros’ sales are subject to conditions in the Chinese passenger vehicle market. Following the economic slowdown and volatility in the Chinese stock market in 2015, China’s central

government enacted a tax policy to incentivize the sale of domestic vehicles by lowering purchases taxes on certain vehicles, including Qoros’ vehicles, until January 1, 2017 from 10% to 5%. In
December 2016, the tax incentive was extended for 2017; effective January 1, 2017, the purchase tax will be 7.5%, before increasing to 10% on January 1, 2018. If the tax policy is not further extended
beyond 2017, this could materially affect demand for Qoros’ vehicles.

During 2016, dealers and OEMs offered customers a variety of inducements to purchase vehicles, including price reductions. In line with many of its competitors, Qoros announced price

reductions on all its vehicle models. In 2017, dealers and OEMs have continued to reduce prices and offer further inducements to purchase vehicles. Qoros expects the downward pressure on vehicle
prices to continue for the next few years.

As of December 31, 2016, Qoros’ dealerships included 115 points of sales, 18 additional points of sales under construction and Memorandums of Understanding with respect to the potential

development of 18 additional points of sales.

Qoros’ strategy is to expand its dealer network and open new points of sales. As part of its strategy to increase its sales, Qoros intends to increase the size of its dealer network by expanding into

smaller Chinese cities (e.g., Tier 3 and Tier 4 cities) and creating incentives for its high-performing dealers to open additional points of sales.

Qoros continues to require additional cash to further its development and, until it achieves significant sales levels, to meet its operating expenses, financing expenses, and capital expenditures.

For further information on Qoros’ liquidity requirements, see “— Qoros' Liquidity and Capital Resources ” and “ Item 3D. Risk Factors—Risks Related to Our Interest in Qoros—Qoros will require
additional capital resources to meet its operating expenses .”

ZIM

The container shipping industry is volatile and experienced a sustained cyclical downturn in the second half of 2015 and 2016. Freight rates, which are primarily driven by containerized demand

and supply balance, have historically been highly volatile. Freight rates declined in each of 2014, 2015 and 2016, mainly as a result of the industry’s ongoing oversupply of capacity. However, freight
rates have begun to increase moderately during the second half of 2016, as a result of, among other factors, carriers’ attempts to handle overcapacity by increasing idle fleet levels and intensive scrapping
activity, as well as the receivership of Hanjin, one of the leading companies in the shipping industry.

Bunker prices have decreased since the beginning of 2014. However, bunker prices increased moderately throughout 2016, reaching an annual peak by the year end, as a result of producer’s

efforts to limit supply.

Should the trend of overcapacity continue to depress freight rates, this could negatively affect the container shipping industry and also affect ZIM’s business, financial position, results of

operations, cash flows and ZIM’s compliance with certain financial covenants under its various debt instruments.

E.              Off-Balance Sheet Arrangements

Neither Kenon nor any of its subsidiaries are party to off-balance sheet arrangements.

231

 
 
 
 
 
 
 
 
 
 
 
 
 
F.             Tabular Disclosure of Contractual Obligations

Kenon

The following table sets forth Kenon’s contractual obligations (including future interest payments) and commercial commitments as of December 31, 2016:

Kenon’s stand-alone contractual obligations 1,2  
IC Power’s consolidated contractual obligations 3   

Total contractual obligations and commitments  

Total

Less than One
Year

Payments Due by Period
One to
Three Years
($ millions)

Three to Five
Years

More than Five
Years

  $
  $

  $

224 
8,492 

  $
  $

— 
1,611 

  $
  $

— 
968 

  $
  $

— 
1,580 

  $
  $

8,716 

  $

1,611 

  $

968 

  $

1,580 

  $

224 
4,333 

4,557 

1. Represents $200 million, plus interest and fees of $24 million, outstanding under the IC Credit Facility as of December 31, 2016.
2. Excludes Kenon's back-to-back guarantees to Chery and convertible loans between Ansonia and Quantum.
3. For further information on IC Power’s consolidated contractual obligations, see “— Tabular Disclosure of Contractual Obligations—IC Power ” below.

As of the date of this annual report, Kenon has outstanding back-to-back guarantee obligations to Chery of up to RMB425 million, plus certain interest and fees, in respect of certain of Qoros’

indebtedness. For further information on, and the risks related to, the guarantees provided by Kenon in respect of Qoros’ debt, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Liquidity and
Capital Resources—Kenon’s   Commitments and Obligations—Back-to-Back Guarantees Provided to Chery ” and “ Item 3.D Risk Factors—Risks Related to Our Strategy and Operations—Kenon has
“back-to-back” guarantee obligations to Chery in respect of guarantees that Chery has given for Qoros’ bank debt and has pledged a substantial portion of its interests in Qoros to secure Qoros’ bank
debt .”

IC Power

The following table sets forth IC Power’s contractual obligations (including future interest payments) and commercial commitments as of December 31, 2016, on a consolidated basis.

Total

Less than One
Year

Payments Due by Period
One to Three
Years
($ millions)

Three to Five
Years

More than Five
Years

Credit from banks and others 
Loans from banks and others, debentures, and lease agreements 1
Trade payables 
Other payables and credit balances 
Purchase obligations 2 
Operating and maintenance agreements 3 
Obligations under EPC Contract Retirement 4 

  $

  $

220 
2,467 
329 
57 
4,431 
832 
156 

  $

220 
341 
285 
57 
221 
358 
129 

  $

- 
228 
10 
- 
433 
274 
23 

  $

- 
977 
22 
- 
547 
34 
- 

Total contractual obligations and commitments 

  $

8,492 

  $

1,611 

  $

968 

  $

1,580 

  $

- 
921 
12 
- 
3,230 
166 
4 

4,333 

1. Consists of estimated future payments of principal, interest and premium on loans from banks and others, debentures, and lease agreements, calculated based on interest rates and foreign exchange

rates applicable as of December 31, 2016 and assuming that all principal payments and payments at maturity on loans from banks and others, debentures, and lease agreements, will be made on their
scheduled payment dates. Also includes the interest rate swaps relating to these obligations, which are calculated based on the LIBOR interest rate set forth in the applicable interest rate swap
contract plus the applicable fixed spread.

2. Consists of purchase commitments for natural gas and gas transportation pursuant to binding obligations which include all significant terms, including fixed or minimum quantities to be purchased;

fixed, minimum or variable price provisions; and the approximate timing of the transaction. Based upon the applicable purchase prices as of December 31, 2016.

3. Consists of future payments to be made under services contract with Siemens based on its projections of the hours of service of Kallpa’s turbines.
4. Consists of future payments to be made under EPC contract, assuming that all progress and completion payments will be made on their scheduled payment dates.

Qoros

The following table sets forth Qoros’ contractual obligations (including future interest payments) and commercial commitments as of December 31, 2016:

Loans and borrowings 3 
Trade and other payables 

Total contractual obligations 

Payments Due by Period

Total

Less Than One
Year 1,2

7,870 
2,810 

10,680 

2,881 
2,685 

5,566 

One to Two Years
2
(in millions of RMB)
853 
21 

874 

  Two to Five Years  

More than Five
Years

2,646 
104 

2,750 

1,490 
— 

1,490 

Includes principal of RMB194 million, which was repaid by Qoros in January 2017.

1.
2. Qoros’ lenders have agreed to reschedule principal payments under the RMB3 billion and RMB1.2 billion scheduled to occur in 2017 and 2018, with principal payments scheduled to occur between

2019 and 2022 (in the case of the RMB3 billion facility) and between 2019 and 2024 (in the case of the RMB1.2 billion facility).
Includes RMB1.4 billion of shareholder loans as of December 31, 2016.

3.

232

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
G.            Safe Harbor

See “ Special Note Regarding Forward-Looking Statements . ”

ITEM 6. Directors, Senior Management and Employees

A.            Directors and Senior Management

Board of Directors

The following table sets forth information regarding our board of directors:

Name
Antoine Bonnier
Laurence N. Charney
Cyril Pierre-Jean Ducau
N. Scott Fine
Aviad Kaufman
Vikram Talwar

Age
34
70
37
59
46
67

Function

  Board Member
  Chairman of the Audit Committee, Compensation Committee Member
  Chairman of the Board, Nominating and Corporate Governance Committee Member
  Audit Committee Member, Compensation Committee Member
  Compensation Committee Member
  Audit Committee Member, Nominating and Corporate Governance Committee Member

Our constitution provides that, unless otherwise determined by a general meeting, the minimum number of directors is five and the maximum number is 12.

Term Begins
2016
2016
2016
2016
2016
2016

Term
Expires
2017
2017
2017
2017
2017
2017

Senior Management

Name
Yoav Doppelt
Robert Rosen
Tzahi Goshen
Barak Cohen

Biographies

Directors

Age
47
44
41
35

  Chief Executive Officer
  General Counsel
  Chief Financial Officer
  Vice President of Business Development and Investor Relations

Position

Antoine Bonnier. Mr. Bonnier is currently an Investment Director of Quantum Pacific (UK) LLP and serves as a member of the board of directors of Pacific Drilling S.A. and of Primus Green

Energy, Inc., each of which may be associated with the same ultimate beneficiary, Mr. Idan Ofer. Mr. Bonnier was previously a member of the investment team of Quantum Pacific Advisory Limited
from 2011 to 2012. Prior to joining Quantum Pacific Advisory Limited in 2011, Mr. Bonnier was an Associate in the Investment Banking Division of Morgan Stanley & Co. During his tenure there,
from 2005 to 2011, he held various positions in the Capital Markets and Mergers and Acquisitions teams in London, Paris and Dubai. Mr. Bonnier graduated from ESCP Europe Business School and
holds a Master of Science in Management.

Laurence N. Charney. Mr. Charney currently serves as the chairman of our audit committee. Mr. Charney retired from Ernst & Young LLP, or Ernst & Young, in June 2007, where, over the

course of his more than 35-year career, he served as Senior Audit Partner, Practice Leader and Senior Advisor. Since his retirement from Ernst & Young, Mr. Charney has served as a business strategist
and financial advisor to boards, senior management and investors of early stage ventures, private businesses and small to mid-cap public corporations across the consumer products, energy, high-
tech/software, media/entertainment, and non-profit sectors. His most recent affiliations include board tenure with Pacific Drilling S.A. and IC Power Ltd, along with Kenon, as well as Marvel
Entertainment, Inc. (through December 2009) and TG Therapeutics, Inc. (from March 2012 through the current date). Mr. Charney is a graduate of Hofstra University with a Bachelor’s Degree in
Business Administration (Accounting), and has also completed an Executive Master’s program at Columbia University. Mr. Charney maintains active membership with the American Institute of
Certified Public Accountants and the New York State Society of Certified Public Accountants.

233

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cyril Pierre-Jean Ducau . Mr. Ducau is the Chief Executive Officer of Ansonia Holdings Singapore B.V. and the Managing Director of Quantum Pacific Ventures Limited. He is a member of
the board of directors of Pacific Drilling S.A., Quantum Pacific Shipping Services Pte. Ltd., Ansonia Holdings Singapore B.V. and IC Power Ltd., as well as other private companies, each of which may
be associated with the same ultimate beneficiary, Mr. Idan Ofer. He was previously Head of Business Development of Quantum Pacific Advisory Limited in London from 2008 to 2012. Prior to joining
Quantum Pacific Advisory Limited, Mr. Ducau was Vice President in the Investment Banking Division of Morgan Stanley & Co. International Ltd. in London and, during his tenure there from 2000 to
2008, he held various positions in the Capital Markets, Leveraged Finance and Mergers and Acquisitions teams. Prior to that, Mr. Ducau gained experience in consultancy working for Arthur D. Little in
Munich and investment management with Credit Agricole UI Private Equity in Paris. Mr. Ducau graduated from ESCP Europe Business School (Paris, Oxford, Berlin) and holds a Master of Science in
business administration and a Diplom Kaufmann.

N. Scott Fine . Mr. Fine is the Chief Executive Officer and Chairman of CTD Holdings Inc., a biotechnology company focused on developing novel therapeutics based on cyclodextrin
technologies. Mr. Fine is also Lead Director for Forward Industries, Sole Director of Operational Technologies Stichting and director of Pacific Drilling S.A. Mr. Fine has been involved in investment
banking for over 35 years, working on a multitude of debt and equity financings, buy and sell side mergers and acquisitions, strategic advisory work and corporate restructurings. Much of his time has
been focused on transactions in the healthcare and consumer products area, including time with The Tempo Group of Jakarta, Indonesia. Mr. Fine was the lead investment banker on the IPO of Keurig
Green Mountain Coffee Roasters and Central European Distribution Corporation, or CEDC, a multi-billion-dollar alcohol company. He was also involved in an Equity Strategic Alliance between
Research Medical and the Tempo Group. Mr. Fine continued his involvement with CEDC, serving as a director from 1996 until 2014, during which time he led the CEDC Board's successful efforts in
2013 to restructure the company through a pre-packaged Chapter 11 process whereby CEDC was acquired by the Russian Standard alcohol group. He also served as Sole Director of Better Place Inc.
from 2013 until 2015. In that role, Mr. Fine successfully managed the global wind down of the company in a timely and efficient manner which was approved by both the Delaware and Israeli courts.
Mr. Fine devotes time to several non-profit organizations, including through his service on the Board of Trustees for the IWM American Air Museum in Britain. Mr. Fine has been a guest lecturer at
Ohio State University’s Moritz School of Law.

Aviad Kaufman . Mr. Kaufman is the Chief Financial Officer of Quantum Pacific (UK) LLP, the chairman of IC, a board member of Israel Chemicals Ltd., IC Power Ltd., Lynav Holdings Ltd.,

Lynav Shipping Ltd. and Maraval II Ltd., each of which may be associated with the same ultimate beneficiary, Mr. Idan Ofer. From 2008 until 2012, Mr. Kaufman served as Chief Financial Officer of
Quantum Pacific Advisory Limited. From 2002 until 2007, Mr. Kaufman served as Director of International Taxation and fulfilled different senior corporate finance roles at Amdocs Ltd. Previously, Mr.
Kaufman held various consultancy positions with KPMG. Mr. Kaufman is a certified public accountant and holds a Bachelor’s Degree in Accounting and Economics from the Hebrew University in
Jerusalem (with distinction), and a Master’s of Business Administration in Finance from Tel Aviv University.

Vikram Talwar . In 1999, Mr. Talwar founded EXL Service Holdings, Inc., or EXL Service, a leading global Business Process Outsourcing company, in the US. EXL Service was listed on

NASDAQ in 2006. Mr. Talwar was the CEO of EXL Service until May 2008 when he was elevated to the position of Executive Chairman of the Board. In April 2011, Mr. Talwar relinquished all his
executive responsibilities and became the Non-Executive Chairman of the Board. After having served 13 years on the Board, Mr. Talwar retired in December 2013. Prior to founding Exl Service, Mr.
Talwar served as the Chief Executive Officer and Managing Director of Ernst and Young Consulting India from 1998 to 1999. Earlier, Mr. Talwar had served in various senior capacities at Bank of
America, including Country Manager in India and other Asian countries from 1970 to 1996. In the past five years, Mr. Talwar has served on the boards of directors of a public company in India and the
U.K. and several private companies. He also holds a Master of Business Administration.

Senior Management

Yoav Doppelt. Mr. Doppelt is our Chief Executive Officer and has served in this capacity since our inception in 2014. Mr. Doppelt also served as the Chief Executive Officer of XT Investments

Group (formerly known as Ofer Investments Group) from its inception in 2007 to 2014 and served as the Chief Executive Officer of XT Capital (formerly known as Ofer Hi-Tech) from 2001 to 2014.
Mr. Doppelt joined the XT Group (formerly known as Ofer Group) in 1996 and has been with XT Capital since its inception in 1997, defining the vision and operational methodology of its private equity
and high-tech investments. Mr. Doppelt has held various finance and managerial positions in the XT Group since joining. Mr. Doppelt has previously served as a member of the board of directors of a
number of public companies and was actively involved in numerous investments within the private equity and high-tech arenas. Currently, Mr. Doppelt serves as the chairman of the board of IC Power
Ltd. and a member of the board of directors of ZIM. Mr. Doppelt has extensive operational and business experience in growth companies and has successfully led several private equity exit transactions.
Recently, Mr. Doppelt has been actively involved in the public offering of equity and debt instruments in the U.S. Mr. Doppelt holds a Bachelor’s Degree in Economics and Management from the
Faculty of Industrial Management at the Technion—Israel Institute of Technology, Haifa, Israel and a Master’s of Business Administration from Haifa University, Israel.

234

 
 
 
 
 
 
Robert Rosen . Prior to joining Kenon as General Counsel, Mr. Rosen spent 15 years in private practice with top tier law firms, including Linklaters LLP and Milbank, Tweed, Hadley and
McCloy LLP. During his time in private practice, Mr. Rosen was primarily involved in cross-border public and private capital markets offerings and other securities transactions, as well as with the
purchase and sale of US and international distressed assets, private equity investments, structured finance transactions and SEC filings and related advice. Mr. Rosen is admitted to the Bar in the state of
New York and holds a Bachelor’s degree with honors from Boston University and a JD and MBA, both from the University of Pittsburgh, where he graduated with high honors.

Tzahi Goshen . Mr. Goshen is our Chief Financial Officer and has served in this capacity since our inception in 2014. Prior to joining Kenon as Chief Financial Officer, Mr. Goshen served as

the Controller of IC since 2008. Mr. Goshen was responsible for all aspects of IC’s financial reporting as a public company. Mr. Goshen also served as the Controller of Gemini Israel Funds Ltd., a
venture capital fund, from 2006 to 2008. Mr. Goshen has vast experience in overseeing the corporate financial activities of traded companies, including acquisitions, tax planning, accounting and
reporting, and internal auditing. Mr. Goshen also serves as a member of IC Power Ltd.’s board of directors and audit committee. Mr. Goshen holds a Bachelor’s Degree in Accounting from the College
of Management and is a certified public accountant in Israel.

Barak Cohen . Mr. Cohen is our Vice President of Business Development and Investor Relations. Prior to joining Kenon as Vice President of Business Development and Investor Relations, Mr.

Cohen worked in various capacities at IC since 2008, most recently as the Senior Director of Business Development and Investor Relations of IC. In this capacity, Mr. Cohen supported and monitored
the development of key growth companies throughout various stages of their lifecycles, contributed to the development of IC’s corporate investment strategy, evaluated new investment opportunities,
assisted in transaction execution. Additionally, Mr. Cohen headed IC’s global investor relations activity. Prior to joining IC, Mr. Cohen held positions at Lehman Brothers (UK) and Ernst & Young
(Israel). Mr. Cohen holds bachelor’s degrees in Economics, summa cum laude, and Accounting & Management, magna cum laude, both from Tel Aviv University.

B.            Compensation

For the year ended December 31, 2016, the aggregate compensation paid (comprising remuneration and the aggregate fair market value of equity awards granted) to our directors and executive

officers was approximately $ 5 million. No amounts in respect of pensions, retirement or similar benefits have been accrued in any of the periods presented in this annual report.

For further information on Kenon’s Share Incentive Plan 2014 and Share Option Plan 2014, see “ Item 6.E Share Ownership .”

C.            Board Practices

As a foreign private issuer, we are permitted to follow certain home country corporate governance practices instead of those otherwise required under the NYSE’s rules for domestic U.S.

issuers, provided that we disclose which requirements we are not following and describe the equivalent home country requirement.

As a foreign private issuer, we are permitted to follow home country practice in lieu of the requirement to have a compensation committee comprised entirely of independent directors. We have
availed ourselves of this exemption, as one of the members of our nominating and corporate governance committee is non-independent under NYSE standards. Other than with respect to this exemption,
we have elected to apply the corporate governance rules of the NYSE that are applicable to U.S. domestic registrants that are not “controlled” companies.

Board of Directors

Our constitution gives our board of directors general powers to manage our business. The board of directors, which consists of eight directors, and of which Cyril Pierre-Jean Ducau serves as

our Chairman, oversees and provides policy guidance on our strategic and business planning processes, oversees the conduct of our business by senior management and is principally responsible for the
succession planning for our key executives.

Director Independence

Pursuant to the NYSE’s listing standards, listed companies are required to have a majority of independent directors. Under the NYSE’s listing standards, (i) a director employed by us or that

has, or had, certain relationships with us during the last three years, cannot be deemed to be an independent director, and (ii) directors will qualify as independent only if our board of directors
affirmatively determines that they have no material relationship with us, either directly or as a partner, shareholder or officer of an organization that has a relationship with either us or IC. Ownership of a
significant amount of our shares, by itself, does not constitute a material relationship.

Although we are permitted to follow home country practice in lieu of the requirement to have a board of directors comprised of a majority of independent directors, we have determined that we

are in compliance with this requirement and that a majority of our board of directors is independent according to the NYSE’s listing standard. Our board of directors has affirmatively determined that
each of Antoine Bonnier, Laurence N. Charney, N. Scott Fine, Aviad Kaufman and Vikram Talwar, representing five of our six directors, are currently “independent directors” as defined under the
applicable rules and regulations of the NYSE.

235

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Election and Removal of Directors

See “ Item 10.B Constitution .”

Service Contracts

None of our board members have service contracts with us or any of our businesses providing for benefits upon termination of employment.

Indemnifications and Limitations on Liability

For information on the indemnification and limitations on liability of our directors, see “ Item 10.B Constitution. ”

Committees of our Board of Directors

We have established three committees, which report regularly to our board of directors on matters relating to the specific areas of risk the committees oversee: the audit committee, the
nominating and corporate governance committee, and the compensation committee. Although we are permitted to follow home country practices with respect to our establishment of audit, nominating
and corporate governance and compensation committees, we have determined that we are in compliance with the NYSE’s requirements in these respects.

Audit Committee

We have established an audit committee to review and discuss with management significant financial, legal and regulatory risks and the steps management takes to monitor, control and report

such exposures; our audit committee also oversees the periodic enterprise-wide risk evaluations conducted by management. Specifically, our audit committee oversees the process concerning:

·

·

·

·

·

the quality and integrity of our financial statements and internal controls;

the appointment, compensation, retention, qualifications and independence of our independent registered public accounting firm;

the performance of our internal audit function and independent registered public accounting firm;

our compliance with legal and regulatory requirements; and

related party transactions.

The members of our audit committee, Laurence N. Charney, N. Scott Fine and Vikram Talwar, are independent directors and meet the requirements for financial literacy as defined under the

applicable rules and regulations of each of the SEC and the NYSE. Our board of directors has determined that Laurence N. Charney is an audit committee financial expert, as defined under the applicable
rules of the SEC, and that each of our audit committee members has the requisite financial sophistication as defined under the applicable rules and regulations of the NYSE. Our audit committee operates
under a written charter that satisfies the applicable standards of each of the SEC and the NYSE.

Nominating and Corporate Governance Committee

Our nominating and corporate governance committee oversees the management of risks associated with board governance, director independence and conflicts of interest. Specifically, our

nominating and corporate governance committee is responsible for identifying qualified candidates to become directors, recommending to the board of directors candidates for all directorships,
overseeing the annual evaluation of the board of directors and its committees and taking a leadership role in shaping our corporate governance.

Our nominating and corporate governance committee will consider candidates for director who are recommended by its members, by other board members and members of our management, as

well as those identified by any third-party search firms retained by it to assist in identifying and evaluating possible candidates. The nominating and corporate governance committee will also consider
recommendations for director candidates submitted by our shareholders. The nominating and corporate governance committee will evaluate and recommend to the board of directors qualified candidates
for election, re-election or appointment to the board, as applicable.

236

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
When evaluating director candidates, the nominating and corporate governance committee seeks to ensure that the board of directors has the requisite skills, experience and expertise and that its
members consist of persons with appropriately diverse and independent backgrounds. The nominating and corporate governance committee will consider all aspects of a candidate’s qualifications in the
context of our needs, including: personal and professional integrity, ethics and values; experience and expertise as an officer in corporate management; experience in the industry of any of our portfolio
businesses and international business and familiarity with our operations; experience as a board member of another publicly traded company; practical and mature business judgment; the extent to which
a candidate would fill a present need on the board of directors; and the other ongoing commitments and obligations of the candidate. However, the nominating and corporate governance committee does
not have any minimum criteria for director candidates. Consideration of new director candidates will typically involve a series of internal discussions, review of information concerning candidates and
interviews with selected candidates.

As a foreign private issuer, we are permitted to follow home country practice in lieu of the requirement to have a compensation committee comprised entirely of independent directors. We have

availed ourselves of this exemption, as one of the members of our nominating and corporate governance committee is non-independent under NYSE standards.

The members of our nominating and corporate governance committee are Cyril Pierre-Jean Ducau and Vikram Talwar. Our nominating and corporate governance committee operates under a

written charter that satisfies the applicable standards of the NYSE  for foreign private issuers.

Compensation Committee

Our compensation committee assists our board in reviewing and approving the compensation structure of our directors and officers, including all forms of compensation to be provided to our

directors and officers. The compensation committee is responsible for, among other things:

·

·

·

·

reviewing and determining the compensation package for our Chief Executive Officer and other senior executives;

reviewing and making recommendations to our board with respect to the compensation of our non-employee directors;

reviewing and approving corporate goals and objectives relevant to the compensation of our Chief Executive Officer and other senior executive, including evaluating their performance in
light of such goals and objectives; and

reviewing periodically and approving and administering stock options plans, long-term incentive compensation or equity plans, programs or similar arrangements, annual bonuses,
employee pension and welfare benefit plans for all employees, including reviewing and approving the granting of options and other incentive awards.

As a foreign private issuer, we are permitted to follow home country practice in lieu of the requirement to have a compensation committee comprised entirely of independent directors.

Nonetheless, we have determined that we are in compliance with this requirement and that the members of our compensation committee, Laurence N. Charney, N. Scott Fine and Aviad Kaufman are
independent directors as defined under the applicable rules and regulations of the NYSE. Our compensation committee operates under a written charter that satisfies the applicable standards of the
NYSE.

Code of Ethics and Ethical Guidelines

Our board of directors has adopted a code of ethics that describes our commitment to, and requirements in connection with, ethical issues relevant to business practices and personal conduct.

D.            Employees

As of December 31, 2016, 2015 and 2014 we, and our consolidated businesses, employed 2,105, 1,361 and 1,379 individuals, respectively, as follows:

Company
IC Power   
Primus  
Kenon   
Total   

Number of Employees as of December 31,
2015

2016

2014

2,069 
31 
5 
2,105 

1,309 
41 
11 
1,361 

1,326 
45 
8 
1,379 

237

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IC Power

As of December 31, 2016, IC Power employed approximately 2,069 employees, of which the substantial majority of employees were located in Latin America. For further information on IC

Power’s employees, see “ Item 4.B Business Overview—IC Power—Employees .”

Qoros

ZIM

As of December 31, 2016, Qoros employed approximately 1,900 employees, consisting of headquarter and factory employees predominantly within China.

As of December 31, 2016, ZIM employed approximately 3,700 employees (including employees of its subsidiaries).

A significant number of ZIM’s Israeli employees are unionized and ZIM is party to numerous collective agreements with respect to its employees. For further information on the risks related to

ZIM’s unionized employees, see “ Item 3.D Risk Factors—Risks Related to the Industries in Which Our Businesses Operate—Our businesses may be adversely affected by work stoppages, union
negotiations, labor disputes and other matters associated with our labor force. ”

Other

As of December 31, 2016, Primus employed 31 employees, all of whom are located in the U.S.

E.            Share Ownership

Interests of our Directors and our Employees

Kenon has established the Share Incentive Plan 2014 and the Share Option Plan 2014 for its directors and management. The Share Incentive Plan 2014 and the Share Option Plan 2014 provide

grants of Kenon’s shares, and stock options in respect of Kenon’s shares, respectively, to management and directors of Kenon, or to officers of Kenon’s subsidiaries or associated companies, as well as to
officers of IC, pursuant to awards, which may be granted by Kenon from time to time. The total number of shares underlying awards which may be granted under the Share Incentive Plan 2014 or
delivered pursuant to the exercise of options granted under the Share Option Plan 2014 shall not, in the aggregate, exceed 3% of the total issued shares (excluding treasury shares) of Kenon. Kenon
granted awards of shares to certain members of its management under the Share Incentive Plan 2014 in 2014 which vested in January 2015 upon the satisfaction of certain conditions, including the
recipient’s continued employment in a specified capacity and Kenon’s listing on the NYSE and the TASE. The aggregate number of shares granted was based upon the aggregate fair market value of the
Kenon shares underlying the award granted, as determined in the award documents, divided by the average closing price of Kenon’s shares over their first three trading days. The aggregate fair value of
the shares granted was $6,384 thousand.

For further information on the compensation of our directors and executive officers, see “ Item 6.B Compensation ” and for further information on our shareholders and related party transactions

policy, see “ Item 7. Major Shareholders and Related Party Transactions .”

Equity Awards to Certain Executive Officers—Subsidiaries and Associated Companies

Kenon is a party to consulting agreements for executives of some of its subsidiaries and associated companies, which provide for cash payments or equity compensation based on equity of the
relevant business or associated company. Additionally, Kenon’s subsidiaries and associated companies may, from time to time, adopt equity compensation arrangements for officers and directors of the
relevant entity. Kenon expects any such arrangements to be on customary terms and within customary limits (in terms of dilution).

ITEM 7.                   Major Shareholders and Related Party Transactions

A.            Major Shareholders

The following table sets forth information regarding the beneficial ownership of our ordinary shares as of April 19, 2017, by each person or entity known to us to beneficially own 5% or more

of our ordinary shares, based upon the 53,719,667 ordinary shares outstanding as of such date, which represents our entire issued and outstanding share capital as of the date of this annual report.

To our knowledge, as of April 19, 2017, we had one shareholder of record in the United States holding approximately 99% of our outstanding ordinary shares. Such numbers are not

representative of the portion of our shares held in the United States nor are they representative of the number of beneficial holders residing in the United States, since such ordinary shares (which
includes the ordinary shares held by the TASE for trading on the TASE) were held of record by one U.S. nominee company, CEDE & Co, which holds all of our shares traded on the NYSE and the
TASE indirectly.

238

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
All of our ordinary shares have the same voting rights.

Beneficial Owner (Name/Address)
Ansonia Holdings Singapore B.V. 1   
XT Investments Ltd. 2   
Laurence N. Charney 3
N. Scott Fine 3
Vikram Talwar 3
Directors and Executive Officers 5  

Ordinary

Shares Owned  
31,156,869 
5,727,128 
9,656 
5,652 
2,952 
— 

Percentage of
Ordinary Shares  

58.0%
10.7%
—4  
—4  
—4  
—4  

1. Based solely on the Schedule 13 D/A (Amendment No. 4) filed by Ansonia Holdings Singapore B.V. with the SEC on January 25 , 2017. A discretionary trust, in which Mr. Idan Ofer is the prime

beneficiary, indirectly holds 100% of Ansonia Holdings Singapore B.V.

2. Based solely upon the Schedule 13 D/A (Amendment No. 1) filed by XT Investments Ltd. and XT Holdings Ltd. with the SEC on January 12, 2016. XT Investments Ltd. is a direct wholly-owned
subsidiary of XT Holdings Ltd., of which each of Orona Investments Ltd. and Lynav Holdings Ltd. is the direct owner of 50% of the outstanding ordinary shares. Orona Investments Ltd. is
indirectly controlled by Mr. Ehud Angel. Lynav Holdings Ltd. is controlled by a discretionary trust in which Mr. Idan Ofer is a prime beneficiary.

3. Based solely on Exhibit 99.3 to the Form 6-K furnished by Kenon with the SEC on June 3, 2016.
4. Owns less than 1% of Kenon’s ordinary shares.
5. Excludes shares held by Laurence N. Charney, N. Scott Fine and Vikram Talwar.

Beneficial ownership is determined in accordance with the rules and regulations of the SEC. In computing the number of shares beneficially owned by a person and the percentage ownership of

that person, we have included shares that such person has the right to acquire within 60 days, including through the exercise of any option, warrant or other right or the conversion of any other security.
These shares, however, are not included in the computation of the percentage ownership of any other person.

Based solely on the Schedule 13 G/A (Amendment No. 3) filed by Bank Leumi le-Israel B.M. on February 6, 2017, Bank Leumi le-Israel B.M. ceased to be the beneficial owner of 5% or more

of our ordinary shares.

We are not aware of any arrangement that may, at a subsequent date, result in a change of our control.

B.            Related Party Transactions

Kenon

Pursuant to its charter, the audit committee must review and approve all related party transactions. The audit committee has a written policy with respect to the approval of related party
transactions. In addition, we have undertaken that, for so long as we are listed on the NYSE, to the extent that we or our subsidiaries will enter into transactions with related parties, such transactions will
be considered and approved by us or our wholly-owned subsidiaries in a manner that is consistent with customary practices followed by companies incorporated in Delaware and shall be reviewed in
accordance with the requirements of Delaware law.

We are party to numerous related party transactions with certain of our affiliates. Set forth below is a summary of these transactions.

Ansonia’s Agreement to Invest in Qoros

In May, June and September 2016, Ansonia, which owns approximately 58% of the outstanding shares of Kenon, provided Quantum with loans of approximately $72 million. Quantum used the
proceeds of these loans to make back-to-back loans in an aggregate principal amount of RMB450 million to Qoros to support Qoros’ working capital requirements; Wuhu Chery provided loans to Qoros
in the same amount.

In light of Qoros’ financing needs, Kenon believes that the transactions described above, including Ansonia’s provision of loans of $72 million to Quantum to facilitate on-loans in an aggregate

amount of up to RMB450 million to Qoros, are in the best interests of Kenon and its shareholders. As Ansonia is a major shareholder in Kenon, these transactions have been reviewed and approved by
Kenon in accordance with its related party transaction policy.

For further information on Ansonia’s agreement to invest in Qoros, see “ Item 5.B Liquidity and Capital Resources—Qoros’ Liquidity and Capital Resources—Material Indebtedness—

Shareholder Loans ” and the full text of the related Loan Agreement and the Undertaking Agreement, copies of which are filed as exhibits to this annual report.

239

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Ansonia’s Commitment to Fund RMB25 million of Kenon’s Back-to-Back Guarantee Obligations

In D ecember 2016, Kenon provided a RMB250 million shareholder loan to Qoros and in connection with this loan, Kenon’s back-to-back guarantee obligations to Chery with respect to

Chery’s guarantee of Qoros’ RMB3 billion loan facility were reduced from RMB750 million to RMB500 million. In connection with this transaction, Kenon’s major shareholder Ansonia committed to
fund RMB25 million of Kenon’s remaining back-to-back guarantee obligations to Wuhu Chery in certain circumstances. For further information, see “ Item 5.B Liquidity and Capital Resources—
Kenon’s Liquidity and Capital Resources—Debt Owed to Kenon from Subsidiaries—Qoros Shareholder Loans. ”

IC Credit Facility

In connection with the consummation of the spin-off, IC provided a $200 million credit facility to us, bearing interest at a rate of 12-Month LIBOR+ 6% per annum. For further information on
the terms of the IC Credit Facility, see “ Item 5.B Liquidity and Capital Resources—Kenon’s Commitments and Obligations—IC Credit Facility. ” For information on the risks related to Kenon’s ability
to repay, and compliance with, the IC Credit Facility, see “ Item 3.D Risk Factors—Risks Related to Our Strategy and Operations—Kenon has significant repayment obligations under the IC Credit
Facility .”

IC Power Reorganization

In March 2016, Kenon announced an internal restructuring pursuant to which IC Power, which was a holding company with no material assets, acquired ICP. As a result of such transaction, IC

Power is now the parent holding company of Kenon’s power generation and distribution businesses. In connection with the reorganization of IC Power, IC Power issued notes of $145 million and $75
million payable to Kenon. In October 2016, IC Power prepaid in full its $75 million note to Kenon.

Kenon had pledged 66% of the ICP shares to secure the IC Credit Facility. In connection with the internal reorganization, this pledge over ICP shares was released and the ICP shares were

transferred to IC Power, which pledged 66% of the transferred ICP shares to IC. In addition, Kenon also pledged to IC 66% of the shares of IC Power and the $145 million note owing from IC Power to
Kenon.

IC Power

Sales of Electricity and Gas

OPC-Rotem sells electricity through PPAs to some entities that may be considered to be related parties (as they may be considered to be under common control with it). OPC-Rotem recorded

revenues from related parties in the amount of NIS 528 million (approximately $137 million), NIS 570 million (approximately $146 million) and NIS 746 million (approximately $208 million) in the
years ended December 31, 2016, 2015 and 2014, respectively.

OPC-Rotem and OPC-Hadera also sell an immaterial amount of gas to some entities that may be considered related parties.

Qoros

Qoros sources its engines and certain spare parts from Chery in the ordinary course of Qoros’ business. Additionally, Qoros entered into a platform sharing agreement with Chery, pursuant to

which Qoros provides Chery with a license to utilize Qoros’ platform in exchange for a fee.

For further information on Qoros’ commercial arrangements with Chery, see Note 30 to Qoros’ consolidated financial statements, included in this annual report.

C.             Interests of Experts and Counsel

Not applicable.

ITEM 8.                    Financial Information

A.            Consolidated Statements and Other Financial Information

For information on the financial statements filed as a part of this annual report, see “ Item 18. Financial Statements .” For information on our legal proceedings, see “ Item 4.B Business

Overview ” and Note 20 to our financial statements included in this annual report. For information on our dividend policy, see “ Item 10.B Constitution .”

240

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
B.            Significant Changes

For information on any significant changes that may have occurred since the date of our annual financial statements, see “ Item 5. Operating and Financial Review and Prospects—Recent

Developments .”

ITEM 9.                    The Offer and Listing

A.            Offer and Listing Details.

The following table sets forth, for the periods indicated, the reported high and low closing sale prices of our ordinary shares on the NYSE.

Annual:
Year ended December 31, 2015 (since January 6, 2015)  
Year ended December 31, 2016  
Quarterly:
Three months ended June 30, 2015  
Three months ended September 30, 2015 1  
Three months ended December 31, 2015   
Three months ended March 31, 2016  
Three months ended June 30, 2016  
Three months ended September 30, 2016  
Three months ended December 31, 2016   
Three months ended March 31, 2017  
Monthly
October 2016  
November 2016  
December 2016  
January 2017  
February 2017  
March 2017  
April 2017 (through April 18, 2017)   

Price per ordinary share ($)
Low
High

22.13 
12.02 

22.13 
21.10 
14.67 
9.80 
10.90 
12.02 
11.70 
13.11 

11.36 
10.00 
11.70 
13.11 
12.60 
12.70 
12.03 

9.66 
7.40 

19.26 
13.19 
9.66 
7.46 
7.40 
9.57 
8.81 
10.01 

9.88 
8.81 
9.14 
10.72 
10.01 
11.53 
11.19 

1. On July 23, 2015, we completed the pro rata distribution in specie of 18,030,041 ordinary shares of Tower, representing 23% of the then currently outstanding Tower shares and substantially all of

our interest in Tower, to holders of our ordinary shares. The closing price of Tower on NASDAQ on July 23, 2015 was $14.16.

The following table sets forth, for the periods indicated, the reported high and low closing sale prices of our ordinary shares on the TASE.

Annual:
Year ended December 31, 2015 (since January 6, 2015)  
Year ended December 31, 2016  
Quarterly:
Three months ended June 30, 2015  
Three months ended September 30, 2015 1  
Three months ended December 31, 2015   
Three months ended March 31, 2016  
Three months ended June 30, 2016  
Three months ended September 30, 2016  
Three months ended December 31, 2016   
Three months ended March 31, 2017  
Monthly
October 2016  
November 2016  
December 2016  
January 2017  
February 2017  
March 2017  
April 2017 (through April 18, 2017)   

Price per ordinary share (NIS)

High

Low

84.98 
46.34 

84.98 
80.04 
55.93 
40.00 
41.75 
46.34 
45.33 
49.06 

42.95 
38.11 
45.33 
49.06 
47.85 
45.50 
44.81 

37.75 
28.10 

74.75 
51.51 
37.75 
29.13 
28.10 
36.12 
33.30 
37.55 

37.37 
33.30 
34.58 
40.87 
37.55 
41.53 
40.40 

1. On July 23, 2015, we completed the pro rata distribution in specie of 18,030,041 ordinary shares of Tower, representing 23% of the then currently outstanding Tower shares and substantially all of

our interest in Tower, to holders of our ordinary shares. The closing price of Tower on the TASE on July 23, 2015 was NIS 53.00.

241

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
B.            Plan of Distribution

Not applicable.

C.            Markets

Our ordinary shares are listed on each of the NYSE and the TASE under the symbol “KEN.”

D.            Selling Shareholders

Not applicable.

E.             Dilution.

Not applicable.

F.             Expenses of the Issue

Not applicable.

ITEM 10.                 Additional Information

A.            Share Capital

Not applicable.

B.            Constitution

Following certain amendments to the Singapore Companies Act, which took effect in phases on July 1, 2015 and January 3, 2016, our memorandum and articles of association have been

merged into one document called the “constitution” by operation of law on the latter date. The following description of our constitution is a summary and is qualified by reference to the constitution, a
copy of which has previously been filed with the SEC.

New Shares

Under Singapore law, new shares may be issued only with the prior approval of our shareholders in a general meeting. General approval may be sought from our shareholders in a general

meeting for the issue of shares. Approval, if granted, will lapse at the earlier of:

·

·

·

the conclusion of the next annual general meeting;

the expiration of the period within which the next annual general meeting is required by law to be held (i.e., within 18 months from our incorporation date (and in the case of subsequent
periods, 15 months)) or six months from our financial year end, being December 31, whichever is earlier; or

the subsequent revocation or modification of approval by our shareholders acting at a duly convened general meeting.

Our shareholders have provided such general authority to issue new shares until the conclusion of our 2017 annual general meeting. Subject to this and the provisions of the Singapore

Companies Act and our constitution, all new shares are under the control of the directors who may allot and issue new shares to such persons on such terms and conditions and with the rights and
restrictions as they may think fit to impose.

242

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Preference Shares

Our constitution provides that we may issue shares of a different class with preferential, deferred, qualified or other special rights, privileges or conditions as our board of directors may

determine. Under the Singapore Companies Act, our preference shareholders will have the right to attend any general meeting insofar as the circumstances set forth below apply and on a poll at such
general meeting, to have at least one vote for every preference share held:

·

·

upon any resolution concerning the winding-up of our company; and

upon any resolution which varies the rights attached to such preference shares.

We may, subject to the prior approval in a general meeting of our shareholders, issue preference shares which are, or at our option, subject to redemption provided that such preference shares

may not be redeemed out of capital unless:

·

all the directors have made a solvency statement in relation to such redemption; and

· we have lodged a copy of the statement with the Singapore Registrar of Companies.

Further, the shares must be fully paid-up before they are redeemed.

Transfer of Ordinary Shares

Subject to applicable securities laws in relevant jurisdictions and our constitution, our ordinary shares are freely transferable. Shares may be transferred by a duly signed instrument of transfer in

any usual or common form or in a form acceptable to our directors. The directors may decline to register any transfer unless, among other things, evidence of payment of any stamp duty payable with
respect to the transfer is provided together with other evidence of ownership and title as the directors may require. We will replace lost or destroyed certificates for shares upon notice to us and upon,
among other things, the applicant furnishing evidence and indemnity as the directors may require and the payment of all applicable fees.

Election and Re-election of Directors

Under our constitution, our shareholders by ordinary resolution, or our board of directors, may appoint any person to be a director as an additional director or to fill a casual vacancy, provided

that any person so appointed by our board of directors shall hold office only until the next annual general meeting, and shall then be eligible for re-election.

Our constitution provides that, subject to the Singapore Companies Act, no person other than a director retiring at a general meeting is eligible for appointment as a director at any general

meeting, without the recommendation of the Board for election, unless (a) in the case of a member or members who in aggregate hold(s) more than fifty percent of the total number of our issued and
paid-up shares (excluding treasury shares), not less than ten days, or (b) in the case of a member or members who in aggregate hold(s) more than five percent of the total number of our issued and paid-
up shares (excluding treasury shares), not less than 120 days, before the date of the notice provided to members in connection with the general meeting, a written notice signed by such member or
members (other than the person to be proposed for appointment) who (i) are qualified to attend and vote at the meeting for which such notice is given, and (ii) have held shares representing the
prescribed threshold in (a) or (b) above, for a continuous period of at least one year prior to the date on which such notice is given, is lodged at our registered office. Such a notice must also include the
consent of the person nominated.

Shareholders’ Meetings

We are required to hold an annual general meeting each year. Annual general meetings must be held not more than 15 months after the holding of the last preceding annual general meeting, and
in each case, not later than six months from our financial year end, being December 31. The directors may convene an extraordinary general meeting whenever they think fit and they must do so upon the
written request of shareholders representing not less than one-tenth of the paid-up shares as at the date of deposit carries the right to vote at general meetings (disregarding paid-up shares held as treasury
shares). In addition, two or more shareholders holding not less than one-tenth of our total number of issued shares (excluding our treasury shares) may call a meeting of our shareholders. The Singapore
Companies Act requires not less than:

·

·

14 days’ written notice to be given by Kenon of a general meeting to pass an ordinary resolution; and

21 days’ written notice to be given by Kenon of a general meeting to pass a special resolution,

to every member and the auditors of Kenon. Our constitution further provides that in computing the notice period, both the day on which the notice is served, or deemed to be served, and the day for
which the notice is given shall be excluded.

243

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Unless otherwise required by law or by our constitution, voting at general meetings is by ordinary resolution, requiring the affirmative vote of a simple majority of the shares present in person

or represented by proxy at the meeting and entitled to vote on the resolution. An ordinary resolution suffices, for example, for appointments of directors. A special resolution, requiring an affirmative
vote of not less than three-fourths of the shares present in person or represented by proxy at the meeting and entitled to vote on the resolution, is necessary for certain matters under Singapore law, such
as an alteration of our constitution.

Voting Rights

Voting at any meeting of shareholders is by a show of hands unless a poll is duly demanded before or on the declaration of the result of the show of hands. If voting is by a show of hands, every
shareholder who is entitled to vote and who is present in person or by proxy at the meeting has one vote. On a poll, every shareholder who is present in person or by proxy or by attorney, or in the case of
a corporation, by a representative, has one vote for every share held by him or which he represents.

Dividends

We have no current plans to pay annual or semi-annual cash dividends. However, as part of our strategy, we may, in the event that we divest a portion of, or our entire equity interest in, any of

our businesses, distribute such cash proceeds or declare a distribution-in-kind of shares in our investee companies. No dividend may be paid except out of profits and we currently do not have
distributable profits from which dividends may be declared. Any dividends would be limited by the amount of available distributable reserves, which, under Singapore law, will be assessed on the basis
of Kenon’s standalone unconsolidated accounts (which will be based upon the SFRS). Under Singapore law, it is also possible to effect a capital reduction exercise to return cash and/or assets to our
shareholders. The completion of a capital reduction exercise may require the approval of the Singapore Courts, and we may not be successful in our attempts to obtain such approval.

Additionally, because we are a holding company, our ability to pay cash dividends, or declare a distribution-in-kind of the ordinary shares of any of our businesses, may be limited by
restrictions on our ability to obtain sufficient funds through dividends from our businesses, including restrictions under the terms of the agreements governing the indebtedness of our businesses. Subject
to the foregoing, the payment of cash dividends in the future, if any, will be at the discretion of our board of directors and will depend upon such factors as earnings levels, capital requirements,
contractual restrictions, our overall financial condition, available distributable reserves and any other factors deemed relevant by our board of directors. Generally, a final dividend is declared out of
profits disclosed by the accounts presented to the annual general meeting, and requires approval of our shareholders. However, our board of directors can declare interim dividends without approval of
our shareholders.

Bonus and Rights Issues

In a general meeting, our shareholders may, upon the recommendation of the directors, capitalize any reserves or profits and distribute them as fully paid bonus shares to the shareholders in

proportion to their shareholdings.

Takeovers

The Singapore Code on Take-overs and Mergers, the Singapore Companies Act and the Securities and Futures Act, Chapter 289 of Singapore regulate, among other things, the acquisition of

ordinary shares of Singapore-incorporated public companies. Any person acquiring an interest, whether by a series of transactions over a period of time or not, either on his own or together with parties
acting in concert with such person, in 30% or more of our voting shares, or, if such person holds, either on his own or together with parties acting in concert with such person, between 30% and 50%
(both amounts inclusive) of our voting shares, and if such person (or parties acting in concert with such person) acquires additional voting shares representing more than 1% of our voting shares in any
six-month period, must, except with the consent of the Securities Industry Council in Singapore, extend a mandatory takeover offer for the remaining voting shares in accordance with the provisions of
the Singapore Code on Take-overs and Mergers.

“Parties acting in concert” comprise individuals or companies who, pursuant to an agreement or understanding (whether formal or informal), cooperate, through the acquisition by any of them

of shares in a company, to obtain or consolidate effective control of that company. Certain persons are presumed (unless the presumption is rebutted) to be acting in concert with each other. They
include:

·

·

·

a company and its related companies, the associated companies of any of the company and its related companies, companies whose associated companies include any of these companies
and any person who has provided financial assistance (other than a bank in the ordinary course of business) to any of the foregoing for the purchase of voting rights;

a company and its directors (including their close relatives, related trusts and companies controlled by any of the directors, their close relatives and related trusts);

a company and its pension funds and employee share schemes;

244

 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

·

·

·

a person and any investment company, unit trust or other fund whose investment such person manages on a discretionary basis but only in respect of the investment account which such
person manages;

a financial or other professional adviser, including a stockbroker, and its clients in respect of shares held by the adviser and persons controlling, controlled by or under the same control as
the adviser and all the funds managed by the adviser on a discretionary basis, where the shareholdings of the adviser and any of those funds in the client total 10% or more of the client’s
equity share capital;

directors of a company (including their close relatives, related trusts and companies controlled by any of such directors, their close relatives and related trusts) which is subject to an offer or
where the directors have reason to believe a bona fide offer for the company may be imminent;

partners; and

an individual and such person’s close relatives, related trusts, any person who is accustomed to act in accordance with such person’s instructions and companies controlled by the
individual, such person’s close relatives, related trusts or any person who is accustomed to act in accordance with such person’s instructions and any person who has provided financial
assistance (other than a bank in the ordinary course of business) to any of the foregoing for the purchase of voting rights.

Subject to certain exceptions, a mandatory takeover offer must be in cash or be accompanied by a cash alternative at not less than the highest price paid by the offeror or parties acting in concert

with the offeror during the offer period and within the six months preceding the acquisition of shares that triggered the mandatory offer obligation.

Under the Singapore Code on Take-overs and Mergers, where effective control of a company is acquired or consolidated by a person, or persons acting in concert, a general offer to all other

shareholders is normally required. An offeror must treat all shareholders of the same class in an offeree company equally. A fundamental requirement is that shareholders in the company subject to the
takeover offer must be given sufficient information, advice and time to consider and decide on the offer. These legal requirements may impede or delay a takeover of our company by a third-party.

In October 2014, the Securities Industry Council of Singapore waived application of the Singapore Code on Take-overs and Mergers to the Company, subject to certain conditions. Pursuant to
the waiver, for as long as Kenon is not listed on a securities exchange in Singapore, and except in the case of a tender offer (within the meaning of U.S. securities laws) where the offeror relies on a Tier
1 exemption to avoid full compliance with U.S. tender offer regulations, the Singapore Code on Take-overs and Mergers shall not apply to Kenon.

Insofar as the Singapore Code on Take-overs and Mergers applies to Kenon, the Singapore Code on Take-overs and Mergers generally provides that the board of directors of Kenon should

bring the offer to the shareholders of Kenon in accordance with the Singapore Code on Take-overs and Mergers and refrain from an action which will deny the shareholders from the possibility to decide
on the offer.

Liquidation or Other Return of Capital

On a winding-up or other return of capital, subject to any special rights attaching to any other class of shares, holders of ordinary shares will be entitled to participate in any surplus assets in

proportion to their shareholdings.

Limitations on Rights to Hold or Vote Ordinary Shares

Except as discussed above under “ —Takeovers ,” there are no limitations imposed by the laws of Singapore or by our constitution on the right of non-resident shareholders to hold or vote

ordinary shares.

Limitations of Liability and Indemnification Matters

Our constitution currently provides that, subject to the provisions of the Singapore Companies Act and every other act applicable to Kenon, every director, secretary or other officer of our

company or our subsidiaries and affiliates shall be entitled to be indemnified by our company against all costs, charges, losses, expenses and liabilities incurred by him or her in the execution and
discharge of his or her duties (and where he serves at our request as a director, officer, employee or agent of any of our subsidiaries or affiliates) or in relation thereto and in particular and without
prejudice to the generality of the foregoing, no director, secretary or other officer of our company shall be liable for the acts, receipts, neglects or defaults of any other director or officer or for joining in
any receipt or other act for conformity or for any loss or expense happening to our company through the insufficiency or deficiency of title to any property acquired by order of the directors for or on
behalf of our company or for the insufficiency or deficiency of any security in or upon which any of the moneys of our company shall be invested or for any loss or damage arising from the bankruptcy,
insolvency or tortious act of any person with whom any moneys, securities or effects shall be deposited or left or for any other loss, damage or misfortune whatever which shall happen in the execution
of the duties of his or her office or in relation thereto unless the same shall happen through his or her own negligence, default, breach of duty or breach of trust.

245

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The limitation of liability and indemnification provisions in our constitution may discourage shareholders from bringing a lawsuit against directors for breach of their fiduciary duties. They may
also reduce the likelihood of derivative litigation against directors and officers, even though an action, if successful, might benefit us and our shareholders. A shareholder’s investment may be harmed to
the extent we pay the costs of settlement and damage awards against directors and officers pursuant to these indemnification provisions. Insofar as indemnification for liabilities arising under the
Securities Act of 1933, or the Securities Act, may be permitted to our directors, officers and controlling persons pursuant to the foregoing provisions, or otherwise, we have been advised that, in the
opinion of the SEC, such indemnification is against public policy as expressed in the Securities Act, and is, therefore, unenforceable.

Comparison of Shareholder Rights

We are incorporated under the laws of Singapore. The following discussion summarizes material differences between the rights of holders of our ordinary shares and the rights of holders of the

common stock of a typical corporation incorporated under the laws of the state of Delaware which result from differences in governing documents and the laws of Singapore and Delaware.

This discussion does not purport to be a complete statement of the rights of holders of our ordinary shares under applicable law in Singapore and our constitution or the rights of holders of the

common stock of a typical corporation under applicable Delaware law and a typical certificate of incorporation and bylaws.

Delaware

Singapore—Kenon Holdings Ltd.

Board of Directors

A typical certificate of incorporation and bylaws would provide that the number of directors on
the board of directors will be fixed from time to time by a vote of the majority of the authorized
directors. Under Delaware law, a board of directors can be divided into classes and cumulative
voting in the election of directors is only permitted if expressly authorized in a corporation’s
certificate of incorporation.

  The constitution of companies will typically state the minimum and maximum number of directors
as well as provide that the number of directors may be increased or reduced by shareholders via
ordinary resolution passed at a general meeting, provided that the number of directors following
such increase or reduction is within the maximum and minimum number of directors provided in the
constitution and the Singapore Companies Act, respectively. Our constitution provides that, unless
otherwise determined by a general meeting, the minimum number of directors is five and the
maximum number is 12.

Limitation on Personal Liability of Directors

A typical certificate of incorporation provides for the elimination of personal monetary liability of
directors for breach of fiduciary duties as directors to the fullest extent permissible under the laws
of Delaware, except for liability (i) for any breach of a director’s loyalty to the corporation or its
stockholders, (ii) for acts or omissions not in good faith or which involve intentional misconduct
or a knowing violation of law, (iii) under Section 174 of the Delaware General Corporation Law
(relating to the liability of directors for unlawful payment of a dividend or an unlawful stock
purchase or redemption) or (iv) for any transaction from which the director derived an improper
personal benefit. A typical certificate of incorporation would also provide that if the Delaware
General Corporation Law is amended so as to allow further elimination of, or limitations on,
director liability, then the liability of directors will be eliminated or limited to the fullest extent
permitted by the Delaware General Corporation Law as so amended.

  Pursuant to the Singapore Companies Act, any provision (whether in the constitution, contract or

otherwise) purporting to exempt a director (to any extent) from any liability attaching in connection
with any negligence, default, breach of duty or breach of trust in relation to Kenon will be void
except as permitted under the Singapore Companies Act. Nevertheless, a director can be released by
the shareholders of Kenon for breaches of duty to Kenon, except in the case of fraud, illegality,
insolvency and oppression or disregard of minority interests.

Our constitution currently provides that, subject to the provisions of the Singapore Companies Act
and every other act for the time being in force concerning companies and affecting Kenon, every
director, auditor, secretary or other officer of Kenon and its subsidiaries and affiliates shall be
entitled to be indemnified by Kenon against all liabilities incurred by him in the execution and
discharge of his duties and where he serves at the request of Kenon as a director, officer, employee
or agent of any subsidiary or affiliate of Kenon or in relation thereto, including any liability incurred
by him in defending any proceedings, whether civil or criminal, which relate to anything done or
omitted or alleged to have been done or omitted by him as an officer or employee of Kenon, and in
which judgment is given in his favor (or the proceedings otherwise disposed of without any finding
or admission of any material breach of duty on his part) or in which he is acquitted, or in connection
with an application under statute in respect of such act or omission in which relief is granted to him
by the court.

246

 
 
 
 
 
 
 
 
  
 
 
 
  
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Interested Shareholders

  There are no comparable provisions in Singapore with respect to public companies which are not

listed on the Singapore Exchange Securities Trading Limited.

Section 203 of the Delaware General Corporation Law generally prohibits a Delaware corporation
from engaging in specified corporate transactions (such as mergers, stock and asset sales, and loans)
with an “interested stockholder” for three years following the time that the stockholder becomes an
interested stockholder. Subject to specified exceptions, an “interested stockholder” is a person or
group that owns 15% or more of the corporation’s outstanding voting stock (including any rights to
acquire stock pursuant to an option, warrant, agreement, arrangement or understanding, or upon the
exercise of conversion or exchange rights, and stock with respect to which the person has voting
rights only), or is an affiliate or associate of the corporation and was the owner of 15% or more of
the voting stock at any time within the previous three years.

A Delaware corporation may elect to “opt out” of, and not be governed by, Section 203 through a
provision in either its original certificate of incorporation, or an amendment to its original certificate
or bylaws that was approved by majority stockholder vote. With a limited exception, this
amendment would not become effective until 12 months following its adoption.

Removal of Directors

A typical certificate of incorporation and bylaws provide that, subject to the rights of holders of any
preferred stock, directors may be removed at any time by the affirmative vote of the holders of at
least a majority, or in some instances a supermajority, of the voting power of all of the then
outstanding shares entitled to vote generally in the election of directors, voting together as a single
class. A certificate of incorporation could also provide that such a right is only exercisable when a
director is being removed for cause (removal of a director only for cause is the default rule in the
case of a classified board).

  According to the Singapore Companies Act, directors of a public company may be removed
before expiration of their term of office with or without cause by ordinary resolution (i.e., a
resolution which is passed by a simple majority of those shareholders present and voting in person
or by proxy). Notice of the intention to move such a resolution has to be given to Kenon not less
than 28 days before the meeting at which it is moved. Kenon shall then give notice of such
resolution to its shareholders not less than 14 days before the meeting. Where any director
removed in this manner was appointed to represent the interests of any particular class of
shareholders or debenture holders, the resolution to remove such director will not take effect until
such director’s successor has been appointed.

Our constitution provides that Kenon may by ordinary resolution of which special notice has been
given, remove any director before the expiration of his period of office, notwithstanding anything
in our constitution or in any agreement between Kenon and such director and appoint another
person in place of the director so removed.

247

 
 
 
 
 
  
 
 
 
  
 
 
  
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Filling Vacancies on the Board of Directors

A typical certificate of incorporation and bylaws provide that, subject to the rights of the holders of
any preferred stock, any vacancy, whether arising through death, resignation, retirement,
disqualification, removal, an increase in the number of directors or any other reason, may be filled
by a majority vote of the remaining directors, even if such directors remaining in office constitute
less than a quorum, or by the sole remaining director. Any newly elected director usually holds
office for the remainder of the full term expiring at the annual meeting of stockholders at which the
term of the class of directors to which the newly elected director has been elected expires.

  The constitution of a Singapore company typically provides that the directors have the power to

appoint any person to be a director, either to fill a vacancy or as an addition to the existing
directors, but so that the total number of directors will not at any time exceed the maximum
number fixed in the constitution. Any newly elected director shall hold office until the next
following annual general meeting, where such director will then be eligible for re-election. Our
constitution provides that the shareholders may by ordinary resolution, or the directors may,
appoint any person to be a director as an additional director or to fill a vacancy provided that any
person so appointed by the directors will only hold office until the next annual general meeting,
and will then be eligible for re-election.

Amendment of Governing Documents

Under the Delaware General Corporation Law, amendments to a corporation’s certificate of
incorporation require the approval of stockholders holding a majority of the outstanding shares
entitled to vote on the amendment. If a class vote on the amendment is required by the Delaware
General Corporation Law, a majority of the outstanding stock of the class is required, unless a
greater proportion is specified in the certificate of incorporation or by other provisions of the
Delaware General Corporation Law. Under the Delaware General Corporation Law, the board of
directors may amend bylaws if so authorized in the charter. The stockholders of a Delaware
corporation also have the power to amend bylaws.

  Our constitution may be altered by special resolution (i.e., a resolution passed by at least a three-

fourths majority of the shares entitled to vote, present in person or by proxy at a meeting for
which not less than 21 days written notice is given). The board of directors has no right to amend
the constitution.

Meetings of Shareholders

Annual and Special Meetings

  Annual General Meetings

Typical bylaws provide that annual meetings of stockholders are to be held on a date and at a time
fixed by the board of directors. Under the Delaware General Corporation Law, a special meeting of
stockholders may be called by the board of directors or by any other person authorized to do so in
the certificate of incorporation or the bylaws.

All companies are required to hold an annual general meeting once every calendar year. The first
annual general meeting was required to be held within 18 months of Kenon’s incorporation and
subsequently, annual general meetings must be held not more than 15 months after the holding of
the last preceding annual general meeting, and in each case, not later than six months from
Kenon’s financial year end.

Quorum Requirements

Under the Delaware General Corporation Law, a corporation’s certificate of incorporation or bylaws
can specify the number of shares which constitute the quorum required to conduct business at a
meeting, provided that in no event shall a quorum consist of less than one-third of the shares entitled
to vote at a meeting.

Extraordinary General Meetings

Any general meeting other than the annual general meeting is called an “extraordinary general
meeting.” Two or more members (shareholders) holding not less than 10% of the total number of
issued shares (excluding treasury shares) may call an extraordinary general meeting. In addition,
the constitution usually also provides that general meetings may be convened in accordance with
the Singapore Companies Act by the directors.

Notwithstanding anything in the constitution, the directors are required to convene a general
meeting if required to do so by requisition (i.e., written notice to directors requiring that a meeting
be called) by shareholder(s) holding not less than 10% of the total number of paid-up shares of
Kenon carrying voting rights.

Our constitution provides that the directors may, whenever they think fit, convene an
extraordinary general meeting.

Quorum Requirements

Our constitution provides that shareholders entitled to vote holding 33 and 1/3 percent of our
issued and paid-up shares, present in person or by proxy at a meeting, shall be a quorum. In the
event a quorum is not present, the meeting may be adjourned for one week.

248

 
 
 
 
 
  
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Indemnification of Officers, Directors and Employers

Under the Delaware General Corporation Law, subject to specified limitations in the case of
derivative suits brought by a corporation’s stockholders in its name, a corporation may indemnify
any person who is made a party to any third-party action, suit or proceeding on account of being a
director, officer, employee or agent of the corporation (or was serving at the request of the
corporation in such capacity for another corporation, partnership, joint venture, trust or other
enterprise) against expenses, including attorney’s fees, judgments, fines and amounts paid in
settlement actually and reasonably incurred by him or her in connection with the action, suit or
proceeding through, among other things, a majority vote of a quorum consisting of directors who
were not parties to the suit or proceeding, if the person:

•       acted in good faith and in a manner he or she reasonably believed to be in or not opposed to the
best interests of the corporation or, in some circumstances, at least not opposed to its best
interests; and

•        in a criminal proceeding, had no reasonable cause to believe his or her conduct was unlawful.

Delaware corporate law permits indemnification by a corporation under similar circumstances for
expenses (including attorneys’ fees) actually and reasonably incurred by such persons in connection
with the defense or settlement of a derivative action or suit, except that no indemnification may be
made in respect of any claim, issue or matter as to which the person is adjudged to be liable to the
corporation unless the Delaware Court of Chancery or the court in which the action or suit was
brought determines upon application that the person is fairly and reasonably entitled to indemnity
for the expenses which the court deems to be proper.

To the extent a director, officer, employee or agent is successful in the defense of such an action,
suit or proceeding, the corporation is required by Delaware corporate law to indemnify such person
for reasonable expenses incurred thereby. Expenses (including attorneys’ fees) incurred by such
persons in defending any action, suit or proceeding may be paid in advance of the final disposition
of such action, suit or proceeding upon receipt of an undertaking by or on behalf of that person to
repay the amount if it is ultimately determined that that person is not entitled to be so indemnified.

  The Singapore Companies Act specifically provides that Kenon is allowed to:

•       purchase and maintain for any officer insurance against any liability attaching to such officer
in respect of any negligence, default, breach of duty or breach of trust in relation to Kenon;

•        indemnify such officer against liability incurred by a director to a person other than Kenon
except when the indemnity is against (i) any liability of the director to pay a fine in criminal
proceedings or a sum payable to a regulatory authority by way of a penalty in respect of non-
compliance with any requirement of a regulatory nature (however arising); or (ii) any liability
incurred by the officer (1) in defending criminal proceedings in which he is convicted, (2) in
defending civil proceedings brought by Kenon or a related company of Kenon in which
judgment is given against him or (3) in connection with an application for relief under
specified sections of the Singapore Companies Act in which the court refuses to grant him
relief.

•       indemnify any auditor against any liability incurred or to be incurred by such auditor in

defending any proceedings (whether civil or criminal) in which judgment is given in such
auditor’s favor or in which such auditor is acquitted; or

•        indemnify any auditor against any liability incurred by such auditor in connection with any
application under specified sections of the Singapore Companies Act in which relief is
granted to such auditor by a court.

In cases where, inter alia, an officer is sued by Kenon the Singapore Companies Act gives the
court the power to relieve directors either wholly or partially from the consequences of their
negligence, default, breach of duty or breach of trust. However, Singapore case law has indicated
that such relief will not be granted to a director who has benefited as a result of his or her breach
of trust. In order for relief to be obtained, it must be shown that (i) the director acted reasonably;
(ii) the director acted honestly; and (iii) it is fair, having regard to all the circumstances of the case
including those connected with such director’s appointment, to excuse the director.

Our constitution currently provides that, subject to the provisions of the Singapore Companies Act
and every other act for the time being in force concerning companies and affecting Kenon, every
director, auditor, secretary or other officer of Kenon and its subsidiaries and affiliates shall be
entitled to be indemnified by Kenon against all liabilities incurred by him in the execution and
discharge of his duties and where he serves at the request of Kenon as a director, officer,
employee or agent of any subsidiary or affiliate of Kenon or in relation thereto, including any
liability incurred by him in defending any proceedings, whether civil or criminal, which relate to
anything done or omitted or alleged to have been done or omitted by him as an officer or
employee of Kenon, and in which judgment is given in his favor (or the proceedings otherwise
disposed of without any finding or admission of any material breach of duty on his part) or in
which he is acquitted, or in connection with an application under statute in respect of such act or
omission in which relief is granted to him by the court.

249

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Shareholder Approval of Business Combinations

Generally, under the Delaware General Corporation Law, completion of a merger, consolidation, or
the sale, lease or exchange of substantially all of a corporation’s assets or dissolution requires
approval by the board of directors and by a majority (unless the certificate of incorporation requires
a higher percentage) of outstanding stock of the corporation entitled to vote.

The Delaware General Corporation Law also requires a special vote of stockholders in connection
with a business combination with an “interested stockholder” as defined in section 203 of the
Delaware General Corporation Law. For further information on such provisions, see “— Interested
Shareholders ” above.

  The Singapore Companies Act mandates that specified corporate actions require approval by the

shareholders in a general meeting, notably:

•       notwithstanding anything in Kenon’s constitution, directors are not permitted to carry into
effect any proposals for disposing of the whole or substantially the whole of Kenon’s
undertaking or property unless those proposals have been approved by shareholders in a
general meeting;

•        subject to the constitution of each amalgamating company, an amalgamation proposal must

be approved by the shareholders of each amalgamating company via special resolution at a
general meeting; and

•       notwithstanding anything in Kenon’s constitution, the directors may not, without the prior
approval of shareholders, issue shares, including shares being issued in connection with
corporate actions.

Shareholder Action Without a Meeting

Under the Delaware General Corporation Law, unless otherwise provided in a corporation’s
certificate of incorporation, any action that may be taken at a meeting of stockholders may be taken
without a meeting, without prior notice and without a vote if the holders of outstanding stock,
having not less than the minimum number of votes that would be necessary to authorize such action,
consent in writing. It is not uncommon for a corporation’s certificate of incorporation to prohibit
such action.

  There are no equivalent provisions under the Singapore Companies Act in respect of passing

shareholders’ resolutions by written means that apply to public companies listed on a securities
exchange.

Shareholder Suits

Under the Delaware General Corporation Law, a stockholder may bring a derivative action on
behalf of the corporation to enforce the rights of the corporation. An individual also may commence
a class action suit on behalf of himself or herself and other similarly situated stockholders where the
requirements for maintaining a class action under the Delaware General Corporation Law have been
met. A person may institute and maintain such a suit only if such person was a stockholder at the
time of the transaction which is the subject of the suit or his or her shares thereafter devolved upon
him or her by operation of law. Additionally, under Delaware case law, the plaintiff generally must
be a stockholder not only at the time of the transaction which is the subject of the suit, but also
through the duration of the derivative suit. The Delaware General Corporation Law also requires
that the derivative plaintiff make a demand on the directors of the corporation to assert the corporate
claim before the suit may be prosecuted by the derivative plaintiff, unless such demand would be
futile.

  Derivative actions

The Singapore Companies Act has a provision which provides a mechanism enabling shareholders
to apply to the court for leave to bring a derivative action on behalf of Kenon.

Applications are generally made by shareholders of Kenon or individual directors, but courts are
given the discretion to allow such persons as they deem proper to apply (e.g., beneficial owner of
shares).

It should be noted that this provision of the Singapore Companies Act is primarily used by
minority shareholders to bring an action in the name and on behalf of Kenon or intervene in an
action to which Kenon is a party for the purpose of prosecuting, defending or discontinuing the
action on behalf of Kenon.

Class actions

The concept of class action suits, which allows individual shareholders to bring an action seeking
to represent the class or classes of shareholders, generally does not exist in Singapore. However, it
is possible as a matter of procedure for a number of shareholders to lead an action and establish
liability on behalf of themselves and other shareholders who join in or who are made parties to the
action.

These shareholders are commonly known as “lead plaintiffs.” Further, there are circumstances
under the provisions of certain Singapore statutes where shareholders may file and prove their
claims for compensation in the event that Kenon has been convicted of a criminal offense or has a
court order for the payment of a civil penalty made against it.

Additionally, for as long as Kenon is listed in the U.S. or in Israel, Kenon has undertaken not to
claim that it is not subject to any derivative/class action that may be filed against it in the U.S. or
Israel, as applicable, solely on the basis that it is a Singapore company.

250

 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
  
 
 
 
 
 
 
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Dividends or Other Distributions; Repurchases and Redemptions

The Delaware General Corporation Law permits a corporation to declare and pay dividends out of
statutory surplus or, if there is no surplus, out of net profits for the fiscal year in which the dividend
is declared and/or for the preceding fiscal year as long as the amount of capital of the corporation
following the declaration and payment of the dividend is not less than the aggregate amount of the
capital represented by the issued and outstanding stock of all classes having a preference upon the
distribution of assets.

Under the Delaware General Corporation Law, any corporation may purchase or redeem its own
shares, except that generally it may not purchase or redeem these shares if the capital of the
corporation is impaired at the time or would become impaired as a result of the redemption. A
corporation may, however, purchase or redeem out of capital shares that are entitled upon any
distribution of its assets to a preference over another class or series of its shares if the shares are to
be retired and the capital reduced.

  The Singapore Companies Act provides that no dividends can be paid to shareholders except out

of profits.

The Singapore Companies Act does not provide a definition on when profits are deemed to be
available for the purpose of paying dividends and this is accordingly governed by case law. Our
constitution provides that no dividend can be paid otherwise than out of profits of Kenon.

Acquisition of a company’s own shares

The Singapore Companies Act generally prohibits a company from acquiring its own shares
subject to certain exceptions. Any contract or transaction by which a company acquires or
transfers its own shares is void. However, provided that it is expressly permitted to do so by its
constitution and subject to the special conditions of each permitted acquisition contained in the
Singapore Companies Act, Kenon may:

•        redeem redeemable preference shares (the redemption of these shares will not reduce the

capital of Kenon). Preference shares may be redeemed out of capital if all the directors make
a solvency statement in relation to such redemption in accordance with the Singapore
Companies Act;

•       whether listed on a securities exchange (in Singapore or outside Singapore) or not, make an
off-market purchase of its own shares in accordance with an equal access scheme authorized
in advance at a general meeting;

•       whether listed on a securities exchange (in Singapore or outside Singapore) or not, make a
selective off-market purchase of its own shares in accordance with an agreement authorized
in advance at a general meeting by a special resolution where persons whose shares are to be
acquired and their associated persons have abstained from voting; and

•       whether listed on a securities exchange (in Singapore or outside Singapore) or not, make an
acquisition of its own shares under a contingent purchase contract which has been authorized
in advance at a general meeting by a special resolution.

Kenon may also purchase its own shares by an order of a Singapore court.

The total number of ordinary shares that may be acquired by Kenon in a relevant period may not
exceed 20% of the total number of ordinary shares in that class as of the date of the resolution
pursuant to the relevant share repurchase provisions under the Singapore Companies Act. Where,
however, Kenon has reduced its share capital by a special resolution or a Singapore court made an
order to such effect, the total number of ordinary shares shall be taken to be the total number of
ordinary shares in that class as altered by the special resolution or the order of the court. Payment
must be made out of Kenon’s distributable profits or capital, provided that Kenon is solvent. Such
payment may include any expenses (including brokerage or commission) incurred directly in the
purchase or acquisition by Kenon of its ordinary shares.

Financial assistance for the acquisition of shares

Kenon may not give financial assistance to any person whether directly or indirectly for the
purpose of:

•       the acquisition or proposed acquisition of shares in Kenon or units of such shares; or

•       the acquisition or proposed acquisition of shares in its holding company or ultimate holding

company, as the case may be, or units of such shares.

Financial assistance may take the form of a loan, the giving of a guarantee, the provision of
security, the release of an obligation, the release of a debt or otherwise.

However, it should be noted that Kenon may provide financial assistance for the acquisition of its
shares or shares in its holding company if it complies with the requirements (including, where
applicable, approval by the board of directors or by the passing of a special resolution by its
shareholders) set out in the Singapore Companies Act. Our constitution provides that subject to
the provisions of the Singapore Companies Act, we may purchase or otherwise acquire our own
shares upon such terms and subject to such conditions as we may deem fit. These shares may be
held as treasury shares or cancelled as provided in the Singapore Companies Act or dealt with in
such manner as may be permitted under the Singapore Companies Act. On cancellation of the
shares, the rights and privileges attached to those shares will expire.

251

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Transactions with Officers and Directors

Under the Delaware General Corporation Law, some contracts or transactions in which one or more
of a corporation’s directors has an interest are not void or voidable because of such interest provided
that some conditions, such as obtaining the required approval and fulfilling the requirements of
good faith and full disclosure, are met. Under the Delaware General Corporation Law, either (a) the
stockholders or the board of directors must approve in good faith any such contract or transaction
after full disclosure of the material facts or (b) the contract or transaction must have been “fair” as
to the corporation at the time it was approved. If board approval is sought, the contract or
transaction must be approved in good faith by a majority of disinterested directors after full
disclosure of material facts, even though less than a majority of a quorum.

  Under the Singapore Companies Act, the chief executive officer and directors are not prohibited

from dealing with Kenon, but where they have an interest in a transaction with Kenon, that
interest must be disclosed to the board of directors. In particular, the chief executive officer and
every director who is in any way, whether directly or indirectly, interested in a transaction or
proposed transaction with Kenon must, as soon as practicable after the relevant facts have come to
such officer or director’s knowledge, declare the nature of such officer or director’s interest at a
board of directors’ meeting or send a written notice to Kenon containing details on the nature,
character and extent of his interest in the transaction or proposed transaction with Kenon.

In addition, a director or chief executive officer who holds any office or possesses any property
which, directly or indirectly, duties or interests might be created in conflict with such officer’s
duties or interests as director or chief executive officer, is required to declare the fact and the
nature, character and extent of the conflict at a meeting of directors or send a written notice to
Kenon containing details on the nature, character and extent of the conflict.

The Singapore Companies Act extends the scope of this statutory duty of a director or chief
executive officer to disclose any interests by pronouncing that an interest of a member of the
director’s or, as the case may be, the chief executive officer’s family (including spouse, son,
adopted son, step-son, daughter, adopted daughter and step-daughter) will be treated as an interest
of the director.

There is however no requirement for disclosure where the interest of the director or chief
executive officer (as the case may be) consists only of being a member or creditor of a corporation
which is interested in the proposed transaction with Kenon if the interest may properly be
regarded as immaterial. Where the proposed transaction relates to any loan to Kenon, no
disclosure need be made where the director or chief executive officer has only guaranteed or
joined in guaranteeing the repayment of such loan, unless the constitution provides otherwise.

Further, where the proposed transaction is to be made with or for the benefit of a related
corporation (i.e. the holding company, subsidiary or subsidiary of a common holding company) no
disclosure need be made of the fact that the director or chief executive officer is also a director or
chief executive officer of that corporation, unless the constitution provides otherwise.

Subject to specified exceptions, including a loan to a director for expenditure in defending
criminal or civil proceedings, etc. or in connection with an investigation, or an action proposed to
be taken by a regulatory authority in connection with any alleged negligence, default, breach of
duty or breach of trust by him in relation to Kenon, the Singapore Companies Act prohibits Kenon
from: (i) making a loan or quasi-loan to its directors or to directors of a related corporation (each,
a “relevant director”); (ii) giving a guarantee or security in connection with a loan or quasi-loan
made to a relevant director by any other person; (iii) entering into a credit transaction as creditor
for the benefit of a relevant director; (iv) giving a guarantee or security in connection with such
credit transaction entered into by any person for the benefit of a relevant director; (v) taking part
in an arrangement where another person enters into any of the transactions in (i) to (iv) above or
(vi) below and such person obtains a benefit from Kenon or a related corporation; or (vi)
arranging for the assignment to Kenon or assumption by Kenon of any rights, obligations or
liabilities under a transaction in (i) to (v) above. Kenon is also prohibited from entering into the
transactions in (i) to (vi) above with or for the benefit of a relevant director’s spouse or children
(whether adopted or naturally or step-children).

252

 
 
 
 
  
 
 
 
 
 
 
Delaware

Singapore—Kenon Holdings Ltd.

Dissenters’ Rights

Under the Delaware General Corporation Law, a stockholder of a corporation participating in some
types of major corporate transactions may, under varying circumstances, be entitled to appraisal
rights pursuant to which the stockholder may receive cash in the amount of the fair market value of
his or her shares in lieu of the consideration he or she would otherwise receive in the transaction.

  There are no equivalent provisions under the Singapore Companies Act.

Cumulative Voting

Under the Delaware General Corporation Law, a corporation may adopt in its bylaws that its
directors shall be elected by cumulative voting. When directors are elected by cumulative voting, a
stockholder has the number of votes equal to the number of shares held by such stockholder times
the number of directors nominated for election. The stockholder may cast all of such votes for one
director or among the directors in any proportion.

  There is no equivalent provision under the Singapore Companies Act in respect of companies

incorporated in Singapore.

Anti-Takeover Measures

Under the Delaware General Corporation Law, the certificate of incorporation of a corporation may
give the board the right to issue new classes of preferred stock with voting, conversion, dividend
distribution, and other rights to be determined by the board at the time of issuance, which could
prevent a takeover attempt and thereby preclude shareholders from realizing a potential premium
over the market value of their shares.

In addition, Delaware law does not prohibit a corporation from adopting a stockholder rights plan,
or “poison pill,” which could prevent a takeover attempt and also preclude shareholders from
realizing a potential premium over the market value of their shares.

  The constitution of a Singapore company typically provides that the company may allot and issue
new shares of a different class with preferential, deferred, qualified or other special rights as its
board of directors may determine with the prior approval of the company’s shareholders in a
general meeting. Our constitution provides that our shareholders may grant to our board the
general authority to issue such preference shares until the next general meeting. For further
information, see “ Item 3D. Risk Factors—Risks Relating to Our Ordinary Shares—Our directors
have general authority to allot and issue new shares on terms and conditions and with any
preferences, rights or restrictions as may be determined by our board of directors in its sole
discretion, which may dilute our existing shareholders. We may also issue securities that have
rights and privileges that are more favorable than the rights and privileges accorded to our
existing shareholders” and “Item 10.B Constitution—Preference Shares. ”

Singapore law does not generally prohibit a corporation `from adopting “poison pill”
arrangements which could prevent a takeover attempt and also preclude shareholders from
realizing a potential premium over the market value of their shares

However, under the Singapore Code on Take-overs and Mergers, if, in the course of an offer, or
even before the date of the offer announcement, the board of the offeree company has reason to
believe that a bona fide offer is imminent, the board must not, except pursuant to a contract
entered into earlier, take any action, without the approval of shareholders at a general meeting, on
the affairs of the offeree company that could effectively result in any bona fide offer being
frustrated or the shareholders being denied an opportunity to decide on its merits.

For further information on the Singapore Code on Take-overs and Mergers, see “ —Takeovers .”

253

 
 
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
 
 
 
C.             Material Contracts

For information concerning our material contracts, see “ Item 4. Information on the Company” and “Item 5. Operating and Financial Review and Prospects .”

D.            Exchange Controls

There are currently no exchange control restrictions in effect in Singapore.

E.             Taxation

The following summary of the United States federal income tax and Singapore tax consequences of ownership of our ordinary shares is based upon laws, regulations, decrees, rulings, income

tax conventions (treaties), administrative practice and judicial decisions in effect at the date of this annual report. Legislative, judicial or administrative changes or interpretations may, however, be
forthcoming that could alter or modify the statements and conclusions set forth herein. Any such changes or interpretations may be retroactive and could affect the tax consequences to holders of our
ordinary shares. This summary does not purport to be a legal opinion or to address all tax aspects that may be relevant to a holder of our ordinary shares. Each prospective holder is urged to consult its
tax adviser as to the particular tax consequences to such holder of the ownership and disposition of our ordinary shares, including the applicability and effect of any other tax laws or tax treaties, of
pending or proposed changes in applicable tax laws as of the date of this annual report, and of any actual changes in applicable tax laws after such date.

U.S. Federal Income Tax Considerations

The following summarizes U.S. federal income tax considerations of owning and disposing of our ordinary shares. This summary applies only to U.S. Holders that hold our ordinary shares as

capital assets (generally, property held for investment) and that have the U.S. Dollar as their functional currency.

This summary is based on the Internal Revenue Code of 1986, as amended, or the Code, Treasury regulations promulgated thereunder and on judicial and administrative interpretations of the

Code and the Treasury regulations, all as in effect on the date hereof, and all of which are subject to change, possibly with retroactive effect. This summary does not purport to be a complete description
of the consequences of the transactions described in this annual report, nor does it address the application of estate, gift or other non-income federal tax laws or any state, local or foreign tax laws.
Moreover, this summary does not address all the tax consequences that may be relevant to holders of our ordinary shares in light of their particular circumstances, including the alternative minimum tax,
the Medicare tax on certain investment income and special rules that apply to certain holders such as (but not limited to):

·

·

·

·

·

·

·

·

·

persons that are not U.S. Holders;

persons that are subject to alternative minimum taxes;

insurance companies;

tax-exempt entities;

financial institutions;

broker-dealers;

persons that hold our ordinary shares through partnerships (or other entities classified as partnerships for U.S. federal income tax purposes);

pass-through entities;

persons that actually or constructively own 10% or more of the total combined voting power of all classes of our voting stock;

254

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
·

·

traders in securities that elect to apply a mark-to-market method of accounting, holders that hold our ordinary shares as part of a “hedge,” “straddle,” “conversion,” or other risk reduction
transaction for U.S. federal income tax purposes; and

individuals who receive our ordinary shares upon the exercise of compensatory options or otherwise as compensation.

Moreover, no advance rulings have been or will be sought from the U.S. Internal Revenue Service, or IRS, regarding any matter discussed in this annual report, and counsel to Kenon has not

rendered any opinion with respect to any of the U.S. federal income tax consequences relating to the transactions addressed herein. No assurance can be given that the IRS would not assert, or that a
court would not sustain, a position contrary to any of the tax aspects set forth below.

HOLDERS AND PROSPECTIVE INVESTORS SHOULD CONSULT THEIR TAX ADVISORS REGARDING THE APPLICATION OF THE U.S. FEDERAL TAX RULES TO

THEIR PARTICULAR CIRCUMSTANCES AS WELL AS THE STATE, LOCAL, NON-U.S. AND OTHER TAX CONSEQUENCES TO THEM OF THE OWNERSHIP AND
DISPOSITION OF OUR ORDINARY SHARES.

For purposes of this summary, a “U.S. Holder” is a beneficial owner of our ordinary shares that is, for U.S. federal income tax purposes:

·

·

·

·

an individual who is a citizen or resident of the United States;

a corporation (or other entity taxable as a corporation for U.S. federal income tax purposes) created or organized in the United States or under the laws of the United States, any state thereof
or the District of Columbia;

an estate, the income of which is subject to U.S. federal income taxation regardless of its source; or

a trust that (1) is subject to the primary supervision of a court within the United States and the control of one or more U.S. persons for all substantial decisions or (2) has a valid election in
effect under applicable U.S. Treasury regulations to be treated as a U.S. person.

If a partnership (or other entity taxable as a partnership for U.S. federal income tax purposes) holds our ordinary shares, the tax treatment of a partner in such partnership will generally depend

upon the status of the partner and the activities of the partnership. If you are a partner in a partnership holding our ordinary shares, you should consult your tax advisor.

Taxation of Dividends and Other Distributions on the Ordinary Shares

The gross amount of any distribution made to a U.S. Holder with respect to our ordinary shares, including the amount of any non-U.S. taxes withheld from the distribution, generally will be

includible in income on the day on which the distribution is actually or constructively received by a U.S. Holder as dividend income to the extent the distribution is paid out of our current or accumulated
earnings and profits as determined for U.S. federal income tax purposes. A distribution in excess of our current and accumulated earnings and profits (as determined for U.S. federal income tax
purposes), including the amount of any non-U.S. taxes withheld from the distribution, will be treated as a non-taxable return of capital to the extent of the U.S. Holder’s adjusted basis in our ordinary
shares and as a capital gain to the extent it exceeds the U.S. Holder’s basis. We do not expect to maintain calculations of our earnings and profits under U.S. federal income tax principles, therefore, U.S.
Holders should expect that distributions generally will be treated as dividends for U.S. federal income tax purposes. Such dividends will not be eligible for the dividends-received deduction generally
allowed to U.S. corporations.

Distributions treated as dividends that are received by individuals and other non-corporate U.S. Holders from “qualified foreign corporations” generally qualify for a reduced maximum tax rate
so long as certain holding period and other requirements are met. Dividends paid on our ordinary shares, should qualify for the reduced rate if we are treated as a “qualified foreign corporation.” For this
purpose, a qualified foreign corporation means any foreign corporation provided that: (i) the corporation was not, in the year prior to the year in which the dividend was paid, and is not, in the year in
which the dividend is paid, a PFIC (as discussed below), (ii) certain holding period requirements are met and (iii) either (A) the corporation is eligible for the benefits of a comprehensive income tax
treaty with the United States that the IRS has approved for the purposes of the qualified dividend rules or (B) the stock with respect to which such dividend was paid is readily tradable on an established
securities market in the United States. The United States does not currently have a comprehensive income tax treaty with Singapore. However, the ordinary shares should be considered to be readily
tradable on established securities markets in the United States if they are listed on the NYSE. Therefore, we expect that our ordinary shares should generally be considered to be readily tradable on an
established securities market in the United States, and we expect that dividends with respect to such ordinary shares should qualify for the reduced rate. U.S. Holders are encouraged to consult their tax
advisors regarding the availability of the lower rate for dividends paid with respect to our ordinary shares.

255

 
 
 
 
 
 
 
 
 
 
 
 
 
Dividends on our ordinary shares received by a U.S. Holder will generally be treated as foreign source income for U.S. foreign tax credit purposes. The rules with respect to foreign tax credits

are complex and U.S. Holders should consult their tax advisors regarding the availability of the foreign tax credit in their particular circumstances.

Taxation of Dispositions of the Ordinary Shares

A U.S. Holder will recognize gain or loss on the sale or other taxable disposition of our ordinary shares in an amount equal to the difference between the amount realized on such sale or other
taxable disposition and such U.S. Holder’s adjusted tax basis in our ordinary shares. Such gain or loss generally will be long-term capital gain (taxable at a reduced rate for non-corporate U.S. Holders)
or loss if, on the date of sale or disposition, such ordinary shares were held by such U.S. Holder for more than one year. The deductibility of capital losses is subject to significant limitations. Any gain or
loss recognized by a U.S. Holder generally will be treated as U.S. source gain or loss, as the case may be, for foreign tax credit purposes.

The amount realized on a sale or other taxable disposition of our ordinary shares in exchange for foreign currency generally will equal the U.S. Dollar value of the foreign currency at the spot

exchange rate in effect on the date of sale or other taxable disposition or, if the ordinary shares are traded on an established securities market (such as the NYSE or the TASE), in the case of a cash
method or electing accrual method U.S. Holder of our ordinary shares, the settlement date. A U.S. Holder will have a tax basis in the foreign currency received equal to the U.S. Dollar amount realized.
Any gain or loss realized by a U.S. Holder on a subsequent conversion or other disposition of the foreign currency will be foreign currency gain or loss, which is treated as U.S. source ordinary income
or loss for foreign tax credit purposes.

Passive Foreign Investment Company

In general, a non-U.S. corporation will be classified as a passive foreign investment company, or PFIC, for U.S. federal income tax purposes for any taxable year in which either (i) 75% or more

of its gross income consists of certain types of “passive” income or (ii) 50% or more of the fair market value of its assets (determined on the basis of a quarterly average) produce or are held for the
production of passive income. For this purpose, cash is categorized as a passive asset and our unbooked intangibles will be taken into account and generally treated as non-passive assets. We will be
treated as owning our proportionate share of the assets and earning our proportionate share of the income of any other corporation in which we own, directly or indirectly, 25% or more (by value) of the
shares.

We do not believe that we were a PFIC for the taxable year ended December 31, 2016. We do not anticipate being a PFIC for our current taxable year or in the foreseeable future, although we

can make no assurances in this regard. Our status as a PFIC in any year depends on our assets and activities in that year. We have no reason to believe that our assets or activities will change in a manner
that would cause us to be classified as a PFIC for the current taxable year or for any future year. Because, however, PFIC status is factual in nature and generally cannot be determined until the close of
the taxable year, there can be no assurance that we will not be considered a PFIC for any taxable year.

If we are classified as a PFIC for any taxable year during which a U.S. Holder holds our ordinary shares, the U.S. Holder will generally be subject to imputed interest taxes, characterization of

any gain from the sale or exchange of our ordinary shares as ordinary income, and other disadvantageous tax treatment with respect to our ordinary shares unless the U.S. Holder makes a mark-to-market
election (as described below). Further, if we are classified as a PFIC for any taxable year during which a U.S. Holder holds our ordinary shares and any of our non-U.S. subsidiaries is also a PFIC, such
U.S. Holder would be treated as owning a proportionate amount (by value) of the shares of each such non-U.S. subsidiary classified as a PFIC (each such subsidiary, a lower tier PFIC) for purposes of
the application of these rules. U.S. Holders should consult their tax advisors regarding the application of the PFIC rules to any of our subsidiaries.

As an alternative to the foregoing rules, a U.S. Holder of “marketable stock” in a PFIC may make a mark-to-market election. A mark-to-market election may be made with respect to our
ordinary shares, provided they are actively traded, defined for this purpose as being traded on a “qualified exchange,” other than in de minimis quantities, on at least 15 days during each calendar quarter.
We anticipate that our ordinary shares should qualify as being actively traded, but no assurances may be given in this regard. If a U.S. Holder of our ordinary shares makes this election, the U.S. Holder
will generally (i) include as income for each taxable year the excess, if any, of the fair market value of our ordinary shares held at the end of the taxable year over the adjusted tax basis of such ordinary
shares and (ii) deduct as a loss the excess, if any, of the adjusted tax basis of our ordinary shares over the fair market value of such ordinary shares held at the end of the taxable year, but only to the
extent of the net amount previously included in income as a result of the mark-to-market election. The U.S. Holder’s adjusted tax basis in our ordinary shares would be adjusted to reflect any income or
loss resulting from the mark-to-market election. In addition, any gain such U.S. Holder recognizes upon the sale or other taxable disposition of our ordinary shares will be treated as ordinary income and
any loss will be treated as ordinary loss, but only to the extent of the net amount previously included in income as a result of the mark-to-market election. If a U.S. Holder makes a mark-to-market
election in respect of a corporation classified as a PFIC and such corporation ceases to be classified as a PFIC, the U.S. Holder will not be required to take into account the gain or loss described above
during any period that such corporation is not classified as a PFIC. In the case of a U.S. Holder who has held our ordinary shares during any taxable year in respect of which we were classified as a PFIC
and continues to hold such ordinary shares (or any portion thereof) and has not previously made a mark-to-market election, and who is considering making a mark-to-market election, special tax rules
may apply relating to purging the PFIC taint of such ordinary shares. Because a mark-to-market election cannot be made for any lower tier PFICs that we may own, a U.S. Holder may continue to be
subject to the PFIC rules with respect to such U.S. Holder’s indirect interest in any investments held by us that are treated as an equity interest in a PFIC for U.S. federal income tax purposes.

256

 
 
 
 
 
 
 
 
 
We do not intend to provide the information necessary for U.S. Holders of our ordinary shares to make qualified electing fund elections, which, if available, would result in tax treatment

different from the general tax treatment for PFICs described above.

If a U.S. Holder owns our ordinary shares during any taxable year that we are a PFIC, such U.S. Holder may be subject to certain reporting obligations with respect to our ordinary shares,

including reporting on IRS Form 8621.

Each U.S. Holder should consult its tax adviser concerning the U.S. federal income tax consequences of purchasing, holding, and disposing of our ordinary shares, including the possibility of

making a mark-to-market election, if we are or become classified as a PFIC.

Material Singapore Tax Considerations

The following discussion is a summary of Singapore income tax, goods and services tax, or GST, stamp duty and estate duty considerations relevant to the acquisition, ownership and
disposition of our ordinary shares by an investor who is not tax resident or domiciled in Singapore and who does not carry on business or otherwise have a presence in Singapore. The statements made
herein regarding taxation are general in nature and based upon certain aspects of the current tax laws of Singapore and administrative guidelines issued by the relevant authorities in force as of the date
hereof and are subject to any changes in such laws or administrative guidelines or the interpretation of such laws or guidelines occurring after such date, which changes could be made on a retrospective
basis. The statements made herein do not purport to be a comprehensive or exhaustive description of all of the tax considerations that may be relevant to a decision to acquire, own or dispose of our
ordinary shares and do not purport to deal with the tax consequences applicable to all categories of investors, some of which (such as dealers in securities) may be subject to special rules. Prospective
shareholders are advised to consult their tax advisers as to the Singapore or other tax consequences of the acquisition, ownership or disposal of our ordinary shares, taking into account their own
particular circumstances. The statements below are based upon the assumption that Kenon is tax resident in Singapore for Singapore income tax purposes. It is emphasized that neither Kenon nor any
other persons involved in this annual report accepts responsibility for any tax effects or liabilities resulting from the acquisition, holding or disposal of our ordinary shares.

Income Taxation Under Singapore Law

Dividends or Other Distributions with Respect to Ordinary Shares

Under the one-tier corporate tax system which currently applies to all Singapore tax resident companies, tax on corporate profits is final, and dividends paid by a Singapore tax resident company

will be tax exempt in the hands of a shareholder, whether or not the shareholder is a company or an individual and whether or not the shareholder is a Singapore tax resident.

Capital Gains upon Disposition of Ordinary Shares

Under current Singapore tax laws, there is no tax on capital gains. There are no specific laws or regulations which deal with the characterization of whether a gain is income or capital in nature.
Gains arising from the disposal of our ordinary shares may be construed to be of an income nature and subject to Singapore income tax, if they arise from activities which the Inland Revenue Authority
of Singapore regards as the carrying on of a trade or business in Singapore. However, under Singapore tax laws, any gains derived by a divesting company from its disposal of ordinary shares in an
investee company between June 1, 2012 and May 31, 2022 are generally not taxable if immediately prior to the date of the relevant disposal, the investing company has held at least 20% of the ordinary
shares in the investee company for a continuous period of at least 24 months.

Goods and Services Tax

The issue or transfer of ownership of our ordinary shares should be exempt from Singapore GST. Hence, the holders would not incur any GST on the subscription or subsequent transfer of the

shares.

Stamp Duty

Where our ordinary shares evidenced in certificated forms are acquired in Singapore, stamp duty is payable on the instrument of their transfer at the rate of 0.2% of the consideration for or

market value of our ordinary shares, whichever is higher.

257

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Where an instrument of transfer is executed outside Singapore or no instrument of transfer is executed, no stamp duty is payable on the acquisition of our ordinary shares. However, stamp duty

may be payable if the instrument of transfer is executed outside Singapore and is received in Singapore. The stamp duty is borne by the purchaser unless there is an agreement to the contrary.

On the basis that any transfer instruments in respect of our ordinary shares traded on the NYSE and the TASE are executed outside Singapore through our transfer agent and share registrar in

the United States for registration in our branch share register maintained in the United States (without any transfer instruments being received in Singapore), no stamp duty should be payable in
Singapore on such transfers.

Tax Treaties Regarding Withholding Taxes

There is no comprehensive avoidance of double taxation agreement between the United States and Singapore which applies to withholding taxes on dividends or capital gains.

F.             Dividends and Paying Agents

Not applicable.

G.            Statement by Experts

Not applicable.

H.            Documents on Display

We are subject to the information reporting requirements of the Exchange Act applicable to foreign private issuers, and under those requirements will file reports with the SEC. Those other

reports or other information and this annual report may be inspected without charge at 1 Temasek Avenue #36-01, Millenia Tower, Singapore 039192 and inspected and copied at the public reference
facilities of the SEC located at 100 F Street, N.E., Washington, D.C. 20549. You may also obtain copies of the documents at prescribed rates by writing to the Public Reference Section of the SEC at 100
F Street, N.E., Washington, DC 20549. Please call the SEC at 1-800-SEC-0330 for further information on the public reference room. The SEC also maintains a website at http://www.sec.gov from which
certain filings may be accessed.

As a foreign private issuer, we will be exempt from the rules under the Exchange Act related to the furnishing and content of proxy statements, and our officers, directors and principal
shareholders will be exempt from the reporting and short-swing profit recovery provisions contained in Section 16 of the Exchange Act. In addition, we will not be required under the Exchange Act to
file annual, quarterly and current reports and financial statements with the SEC as frequently or as promptly as United States companies whose securities are registered under the Exchange Act.
However, for so long as we are listed on the NYSE, or any other U.S. exchange, and are registered with the SEC, we will file with the SEC, within 120 days after the end of each fiscal year, or such
applicable time as required by the SEC, an annual report on Form 20-F containing financial statements audited by an independent registered public accounting firm, and will submit to the SEC, on a
Form 6-K, unaudited quarterly financial information for the first three quarters of each year.

We maintain a corporate website at http://www.kenon-holdings.com. Information contained on, or that can be accessed through, our website does not constitute a part of this annual report on

Form 20-F. We have included our website address in this annual report solely as an inactive textual reference.

I.             Subsidiary Information

Not applicable.

ITEM 11.                 Quantitative and Qualitative Disclosures about Market Risk

Our multinational operations expose us to a variety of market risks, which embody the potential for changes in the fair value of the financial instruments or the cash flows deriving from them.
Our risk management policies and those of each of our businesses seek to limit the adverse effects of these market risks on the financial performance of each of our businesses and, consequently, on our
consolidated financial performance. Each of our businesses bear responsibility for the establishment and oversight of their financial risk management framework and have adopted individualized risk
management policies to address those risks specific to their operations.

258

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Our primary market risk exposures are to:

·

·

·

·

currency risk, as a result of changes in the rates of exchange of various foreign currencies (in particular, the Euro and the New Israeli Shekel) in relation to the U.S. Dollar, our functional
currency and the currency against which we measure our exposure;

index risk, as a result of changes in the Consumer Price Index;

interest rate risk, as a result of changes in the market interest rates affecting certain of our businesses’ issuance of debt and related financial instruments; and

price risk, as a result of changes in market prices, such as the price of certain commodities (e.g., natural gas and heavy fuel oil).

For further information on our market risks and the sensitivity analyses of these risks, see Note 30—Financial Instruments to our financial statements included in this annual report.

ITEM 12.                 Description of Securities Other than Equity Securities

A.            Debt Securities

Not applicable.

B.            Warrants and Rights

Not applicable.

C.            Other Securities

Not applicable.

D.            American Depositary Shares

Not applicable.

259

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 13.                 Defaults, Dividend Arrearages and Delinquencies

None.

ITEM 14.                 Material Modifications to the Rights of Security Holders and Use of Proceeds

PART II

None.

ITEM 15.                 Controls and Procedures

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our chief executive officer and chief financial officer, has performed an evaluation of the effectiveness of our disclosure controls and procedures (as

defined in Rule 13a-15(e) under the Exchange Act) as of the end of the period covered by this annual report, as required by Rule 13a-15(b) under the Exchange Act. Based upon this evaluation, our
management, with the participation of our chief executive officer and chief financial officer, has concluded that, as of the end of the period covered by this annual report, our disclosure controls and
procedures were effective in ensuring that the information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported
within the time periods specified in by the SEC’s rules and forms, and that the information required to be disclosed by us in the reports that we file or submit under the Exchange Act is accumulated and
communicated to our management, including our chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure.

Management’s Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate “internal control over financial reporting,” as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. These

rules define internal control over financial reporting as a process designed by, or under the supervision of, a company’s chief executive officer and chief financial officer and effected by our board of
directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance
with generally accepted accounting principles and includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the
transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with
generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3)
provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial
statements.

Our management has excluded DEORSA, DEOCSA, Guatemel and RECSA from its assessment of internal control over financial reporting as of December 31, 2016, as these businesses were

acquired by us on January 22, 2016. DEORSA, DEOCSA, Guatemel and RECSA are included in our consolidated financial statements as from the date of acquisition, and constituted approximately 12%
of our consolidated total assets (excluding any purchase price allocation effect) and $35 million of net income out of our consolidated net loss of $394 million for the year ended December 31, 2016.
Under guidelines established by the SEC, companies are allowed to exclude acquired companies from their assessment of internal control over financial reporting during the year such company was
acquired.

Our management has assessed the design and operating effectiveness of our internal control over financial reporting as of December 31, 2016. This assessment was performed under the
direction and supervision of our chief executive officer and chief financial officer, and based on criteria established in Internal Control—Integrated Framework (2013) issued by the Committee of
Sponsoring Organizations of the Treadway Commission. Based on that evaluation, management concluded that as of December 31, 2016, our internal control over financial reporting was effective.

The effectiveness of our internal control over financial reporting as of December 31, 2016 has been audited by our independent registered public accounting firm and their report thereon is

included elsewhere in this annual report.

Changes in Internal Control over Financial Reporting

During the year ended December 31, 2016, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect,

our internal control over financial reporting.

260

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inherent Limitations of Disclosure Controls and Procedures in Internal Control over Financial Reporting

It should be noted that any system of controls, however well-designed and operated, can provide only reasonable, and not absolute, assurance that the objectives of the system will be met. In

addition, the design of any control system is based in part upon certain assumptions about the likelihood of future events. Projections regarding the effectiveness of a system of controls in future periods
are subject to the risk that such controls may become inadequate because of changes in conditions or deterioration in the degree of compliance with the policies or procedures.

ITEM 16.                 [RESERVED]

ITEM 16A.              Audit Committee Financial Expert

Our board of directors has determined that Mr. Laurence N. Charney is an “audit committee financial expert” as defined in Item 16A of Form 20-F under the Exchange Act. Our board of

directors has also determined that Mr. Laurence N. Charney satisfies the NYSE’s listed company “independence” requirements.

ITEM 16B.              Code of Ethics

We have adopted a Code of Ethics that applies to all our employees, officers and directors, including our chief executive officer and our chief financial officer. Our Code of Conduct is available

on our website at www.kenon-holdings.com.

ITEM 16C.              Principal Accountant Fees and Services

KPMG LLP, a member firm of KPMG International, is our independent registered public accounting firm for the audits of the years ending December 31, 2016 and 2015.

Our audit committee charter requires that all audit and non-audit services provided by our independent auditors are pre-approved by our audit committee, provided that certain de minimis non-

audit services provided by our independent auditors do not need to be approved by our audit committee.

The following table sets forth the aggregate fees by categories specified below in connection with certain professional services rendered by KPMG LLP, and other member firms within the

KPMG network, for the years ended December 31, 2016 and 2015.

Audit Fees 1  
Audit-Related Fees 2  
Tax Fees 3   
All Other Fees   

Total   

Year ended
December 31,

2016

2015

(in thousands of USD)

  $

  $

  $

  $

  $

4,064 
1,387 
144 
26 

5,621 

  $

4,189 
1,030 
394 
— 

5,613 

1.

Includes fees billed or accrued for professional services rendered by the principal accountant, and member firms in their respective network, for the audit of our annual financial statements, and
those of our consolidated subsidiaries, as well as additional services that are normally provided by the accountant in connection with statutory and regulatory filings or engagements, except for those
not required by statute or regulation.

2. The audit-related fees for the year ended December 31, 2016 and 2015 substantially reflect fees billed or accrued in connection with IC Power’s filing of a registration statement on Form F-1.
3. Tax fees consist of fees for professional services rendered during the fiscal year by the principal accountant mainly for tax compliance and assistance with tax audits and appeals.

ITEM 16D.              Exemptions from the Listing Standards for Audit Committees

None.

ITEM 16E.               Purchases of Equity Securities by the Issuer and Affiliated Purchasers

None.

261

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
ITEM 16F.               Change in Registrant’s Certifying Accountant

KPMG LLP is our independent registered public accounting firm with respect to our consolidated financial statements as of and for the years ended December 31, 2015 and 2016. KPMG LLP

has relied on the audit report of Deloitte, Inc. (Panamá ) to the extent our financial statements relate to the combined entities DEORSA and DEOCSA, significant subsidiaries of Kenon, which were
acquired by IC Power on January 22, 2016. After the acquisition, Deloitte, Inc. (Panamá ) was engaged to serve as independent registered public accounting firm of DEORSA and DEOCSA on August 3,
2016.

Neither we nor anyone on our behalf consulted Deloitte, Inc. (Panamá ) regarding either (i) the application of accounting principles to a specified transaction, either completed or proposed; or

the type of audit opinion that might be rendered on our consolidated financial statements, and we have not obtained any written report or oral advice that Deloitte, Inc. (Panamá ) concluded was an
important factor considered by us in reaching a decision as to the accounting, auditing or financial reporting issue, or (ii) any matter that was either the subject of a "disagreement", as defined in Item
16F(a)(1)(iv) of Form 20-F and related instructions to Item 16-F of Form 20-F, with Deloitte, Inc. (Panamá ) or a "reportable event" as described in Item 16F(a)(1)(v) of Form 20-F.

Pursuant to Item 16F(a)(2)(ii)(d) of Form 20-F, we have requested Deloitte, Inc. (Panamá) to review the disclosure required by such item before this annual report is filed with the SEC. We

have provided Deloitte, Inc. (Panamá) the opportunity to furnish us with a letter addressed to the SEC containing any new information, clarification of Kenon’s expression of its views, or the respects in
which it does not agree with the statements made by us in response to this item.

ITEM 16G.              Corporate Governance

None.

ITEM 16H.              Mine Safety Disclosure

Not applicable.

262

 
 
 
 
 
 
 
 
ITEM 17.                 Financial Statements

Not applicable.

ITEM 18.                 Financial Statements

PART III

The financial statements and the related notes required by this Item 18 are included in this annual report beginning on page F-1.

ITEM 19.                 Exhibits

Exhibit Number

Index to Exhibits

Description of Document

1.1

2.1

2.2

2.3

2.4

4.1

4.2

4.3

4.4

4.5

4.6

4.7†

4.8†

4.9

  Kenon Holdings Ltd.’s Constitution (Incorporated by reference to Exhibit 1.1 to Amendment No. 1 to Kenon’s Registration Statement on Form 20-F, filed on December 19,

2014)

  Form of Specimen Share Certificate for Kenon Holdings Ltd.’s Ordinary Shares (Incorporated by reference to Exhibit 2.1 to Kenon’s Annual Report on Form 20-F for the fiscal

year ended December 31, 2014, filed on March 31, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and Millenium Investments Elad Ltd. (Incorporated by reference to Exhibit 99.5 to

Kenon’s Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and Bank Leumi Le-Israel B.M. (Incorporated by reference to Exhibit 99.6 to

Kenon’s Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and XT Investments Ltd. (Incorporated by reference to Exhibit 99.7 to Kenon’s

Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Sale, Separation and Distribution Agreement, dated as of January 7, 2015, between Israel Corporation Ltd. and Kenon Holdings Ltd. (Incorporated by reference to Exhibit 99.2

to Kenon’s Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Loan Agreement, dated as of January 7, 2015, between Israel Corporation Ltd. and Kenon Holdings Ltd, as supplemented by Supplement No. 1 to the Loan Agreement, dated

March 17, 2016 (Incorporated by reference to Exhibit 4.2 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  English translation of Natural Gas Supply Agreement, dated as of January 2, 2006, as amended, among Kallpa Generación S.A., Pluspetrol Peru Corporation S.A., Pluspetrol
Camisea S.A., Hunt Oil Company of Peru L.L.C. Sucursal del Peru, SK Corporation Sucursal Peruana, Sonatrach Peru Corporation S.A.C., Tecpetrol del Peru S.A.C. and
Repsol Exploración Peru Sucursal del Peru (Incorporated by reference to Exhibit 4.3 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on
August 14, 2014)

  English translation of Natural Gas Transportation Agreement, dated as of December 10, 2007, as amended, between Kallpa Generación S.A. and Transportadora de Gas del

Peru S.A. (Incorporated by reference to Exhibit 4.4 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on August 14, 2014)

  Turnkey Engineering, Procurement and Construction Contract, dated as of November 4, 2011, among Cerro del Águila S.A., Astaldi S.p.A. and GyM S.A., as amended

(Incorporated by reference to Exhibit 4.5 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  English translation of Contract of Concession, dated as of October 23, 2010, as amended, between the Government of Peru and Kallpa Generación S.A., relating to the provision
of electric energy services to the public (Incorporated by reference to Exhibit 4.6 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on August
14, 2014)

  Joint Venture Contract, dated as of February 16, 2007, as amended, between Wuhu Chery Automobile Investment Co., Ltd. and Quantum (2007) LLC (Incorporated by

reference to Exhibit 4.7 to Amendment No. 1 to Kenon’s Registration Statement on Form 20-F, filed on December 19, 2014)

  Gas Sale and Purchase Agreement, dated as of November 25, 2012, among Noble Energy Mediterranean Ltd., Delek Drilling Limited Partnership, Isramco Negev 2 Limited

Partnership, Avner Oil Exploration Limited Partnership, Dor Gas Exploration Limited Partnership, and O.P.C. Rotem Ltd. (Incorporated by reference to Exhibit 10.8 to
Amendment No. 1 to IC Power Pte. Ltd.’s Form F-1, filed on November 2, 2015)

  Indenture, dated as of April 4, 2011, between Inkia Energy Limited, as issuer, and Citibank, N.A.as trustee, relating to Inkia Energy Limited’s 8.375% Senior Notes due 2021

(Incorporated by reference to Exhibit 4.9 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2014, filed on March 31, 2015)

263

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit Number

Description of Document

4.10

  Facility Agreement, dated as of January 2, 2011, among O.P.C. Rotem Ltd., as borrower, Bank Leumi Le-Israel B.M., as arranger and agent, Bank Leumi Le-Israel Trust

Company Ltd., as security trustee, and the senior lenders named therein (Incorporated by reference to Exhibit 4.10 to Kenon’s Annual Report on Form 20-F for the fiscal year
ended December 31, 2014, filed on March 31, 2015)

 4.11

 4.12

 4.13

 4.14

 4.15

 4.16

  Credit Agreement, dated as of August 17, 2012, among Cerro del Águila S.A., as borrower, Sumitomo Mitsui Banking Corporation, as administrative agent, and other parties

party thereto (Incorporated by reference to Exhibit 4.11 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2014, filed on March 31, 2015)

  Guarantee Contract, dated as of June 9, 2015, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd. (Incorporated by reference to Exhibit 4.12 to Kenon’s Annual

Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Guarantee Contract, dated as of November 5, 2015, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd. (Incorporated by reference to Exhibit 4.13 to Kenon’s

Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Stock Purchase Agreement, dated as of December 29, 2015, among IC Power Distribution Holdings PTE, Limited, as Purchaser, Inkia Energy, Limited, as Purchaser Guarantor,
DEORSA-DEOCSA Holdings Limited, as Seller, and Estrella Cooperatief BA (Incorporated by reference to Exhibit 4.14 to Kenon’s Annual Report on Form 20-F for the fiscal
year ended December 31, 2015, filed on April 22, 2016)

  Pledge Agreement, dated as of March 17, 2016, between Israel Corporation Ltd. and IC Power Pte. Ltd. (Incorporated by reference to Exhibit 4.15 to Kenon’s Annual Report on

Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Security over Shares Agreement, dated as of March 17, 2016, between Israel Corporation Ltd. and Kenon Holdings Ltd. (Incorporated by reference to Exhibit 4.16 to Kenon’s

Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

 4.17*

  Amendment and Restatement Agreement, dated as of September 2, 2016, relating to the Loan Agreement dated as of April 22, 2016, between Quantum (2007) LLC, as

borrower, and Ansonia Holdings Singapore B.V., as lender, as amended

 4.18

  Undertaking Agreement, dated as of April 22, 2016, among Qoros Automotive Co., Ltd., Quantum (2007) LLC, Kenon Holdings Ltd., Wuhu Chery Automobile Investment

Co., Ltd., Chery Automobiles Limited, and Ansonia Holdings Singapore B.V. (Incorporated by reference to Exhibit 4.18 to Kenon’s Annual Report on Form 20-F for the fiscal
year ended December 31, 2015, filed on April 22, 2016)

 4.19*

 4.20*

 4.21*

 4.22*

 4.23**

 4.24**

  8.1*

12.1*

12.2*

13.1*

15.1*

15.2*

15.3*

15.4*

15.5*

  Additional Undertaking Agreement, dated as of September 2, 2016, among Qoros Automotive Co., Ltd., Quantum (2007) LLC, Kenon Holdings Ltd., Wuhu Chery Automobile

Investment Co., Ltd., Chery Automobiles Limited, and Ansonia Holdings Singapore B.V.

  Fourth Amended and Restated Limited Liability Company Agreement of Quantum (2007) LLC, dated as of September 2, 2016

  Release Agreement, dated December 21, 2016, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd.

  Equity Pledge Contract, dated December 21, 2016, between Quantum (2007) LLC, as Pledgor, and Chery Automobile Co. Ltd., as Pledgee

  Further Release and Cash Support Agreement, dated March 9, 2017, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd.

  The Second Equity Pledge Contract in relation to 700 Million Loan, dated March 9, 2017, between Quantum (2007) LLC, as Pledgor, and Chery Automobile Co. Ltd., as

Pledgee

  List of subsidiaries of Kenon Holdings Ltd.

  Rule 13a-14(a)/15d-14(a) Certification of Chief Executive Officer

  Rule 13a-14(a)/15d-14(a) Certification of Chief Financial Officer

  Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

  Consent of KPMG LLP, Independent Registered Public Accounting Firm of Kenon Holdings Ltd.

  Consent of Somekh Chaikin, a Member Firm of KPMG International

  Consent of KPMG Huazhen LLP, Independent Auditor of Qoros Automotive Co., Ltd.

  Consent of Deloitte, Inc. (Panamá), Independent Registered Public Accounting Firm of the Combined Entities (Distribuidora de Electricidad de Oriente, S.A. and Distribuidora

de Electricidad de Occidente, S.A.)

  Consent of Brightman Almagor Zohar & Co., a Member Firm of Deloitte Touche Tohmatsu, independent auditor of Tower Semiconductor Ltd.

*      Filed herewith.
**   To be filed by amendment shortly after the date of this annual report.
†

Portions of this exhibit have been omitted pursuant to a request for confidential treatment under Rule 24b-2 of the Exchange Act. Omitted information has been filed separately with the SEC.

264

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd

Consolidated Financial Statements
as at December 31, 2016 and 2015 and for the years then ended

Combined Financial Statements for the year ended December 31, 2014

Contents

Reports of Independent Registered Public Accounting Firms

Consolidated Statements of Financial Position

Consolidated Statements of Profit & Loss and Combined Statement of Profit & Loss

Consolidated Statements of Other Comprehensive Income (Loss) and Combined Statement of Other Comprehensive Loss

Consolidated Statements of Changes in Equity

Combined Statement of Changes in Former Parent Company Investment

Consolidated Statements of Cash Flows and Combined Statement of Cash Flows

Notes to the consolidated/combined financial statements

Affiliate Financial Statements Filed Pursuant to Rule 3-09 of Regulation S-X

Qoros Automotive Co., Ltd.

Consolidated Financial Statements for the Year Ended December 31, 2016

Independent Auditors’ Report

Consolidated Statements of Financial Position

Consolidated Statements of Profit or Loss and Other Comprehensive Income

Consolidated Statements of Changes in Equity

Consolidated Statements of Cash Flows

Notes to the Consolidated Financial Statements

Page

F-1 – F-6

F-7 – F-8

F-9

F-10

F-11 – F-12

   F-13

F-14 – F-15

F-16 – F-127

F-129 – F-130

F-131 – F-132

F-133

F-134 – F-135

F-136 – F-138

F-139 – F-181

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
12 

Report of Independent Registered Public Accounting Firm

The Board of Directors and Stockholders
Kenon Holdings Ltd.:

KPMG LLP
16 Raffles Quay #22-00
Hong Leong Building
Singapore 048581

Telephone    +65 6213 3388
Fax                 +65 6225 0984
Internet         www.kpmg.sg

We  have  audited  the  accompanying  consolidated  statements  of  financial  position  of  Kenon  Holdings  Ltd.  (the  "Company")  and  subsidiaries  as  of  December  31,  2016  and  2015,  and  the  related
consolidated statements of profit and loss, other comprehensive income (loss), changes in equity, and cash flows for the years then ended. These consolidated financial statements are the responsibility of
the Company's management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.

We did not audit the combined financial statements of certain consolidated subsidiaries, Distribuidora de Electricidad de Occidente, S. A. ('DEOCSA') and Distribuidora de Electricidad de Oriente, S. A.
('DEORSA'), the combined financial statements of which reflected total assets and total revenues that constituted 16.4% percent and 27.1% percent, respectively, of the related consolidated totals of
Kenon Holdings Ltd. as of and for the year ended 31 December 31, 2016. Those combined financial statements were audited by other auditors whose report has been furnished to us, and our opinion,
insofar as it relates to the amounts included for DEOCSA and DEORSA, is based solely on the report of the other auditors.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain
reasonable  assurance  about  whether  the  financial  statements  are  free  of  material  misstatement.  An  audit  includes  examining,  on  a  test  basis,  evidence  supporting  the  amounts  and  disclosures  in  the
financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We
believe that our audits provide a reasonable basis for our opinion.

In our opinion, based on our audits and the report of the other auditors, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of Kenon
Holdings Ltd. and subsidiaries as of December 31, 2016 and 2015, and the results of their operations and their cash flows for the years then ended, in conformity with International Financial Reporting
Standards as issued by the International Accounting Standards Board.

We  also  have  audited,  in  accordance  with  the  standards  of  the  Public  Company  Accounting  Oversight  Board  (United  States),  Kenon  Holdings  Ltd.'s  internal  control  over  financial  reporting  as  of
December 31, 2016, based on criteria established in Internal Control – Integrated Framework   (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO), and
our report dated April 15, 2017 expressed an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

/s/ KPMG LLP
KPMG LLP
Public Accountants and
Chartered Accountants

Singapore
April 15, 2017

KPMG  LLP  (Registration  No.  T0BLL1267L),  an  accounting
limited  liability  partnership  registered  in  Singapore  under  the
Limited  Liability  Partnership  Act  (Chapter  163A)  and  a  member
firm of the KPMG network of independent member firms affiliated
with  KPMG  International  Cooperative  ("KPMG  International"),  a
Swiss entitiy.

F - 1

 
 
 
 
 
 
 
 
 
 
 
KPMG LLP
16 Raffles Quay #22-00
Hong Leong Building
Singapore 048581

Telephone    +65 6213 3388
Fax                 +65 6225 0984
Internet         www.kpmg.sg

Report of Independent Registered Public Accounting Firm

The Board of Directors and Stockholders
Kenon Holdings Ltd.:

We have audited Kenon Holdings Ltd.'s internal control over financial reporting as of December 31, 2016, based on criteria established in Internal Control – Integrated Framework (2013) issued by the
Committee of Sponsoring Organizations of the Treadway Commission (COSO) . Kenon Holding Ltd's management is responsible for maintaining effective internal control over financial reporting and
for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management's Report on Internal Control Over Financial Reporting. Our responsibility is
to express an opinion on the Company's internal control over financial reporting based on our audit.

We conducted  our audit  in accordance  with the standards of the Public Company Accounting  Oversight Board (United  States).  Those standards  require  that  we plan and perform  the audit  to obtain
reasonable  assurance  about  whether  effective  internal  control  over  financial  reporting  was  maintained  in  all  material  respects.  Our audit  included  obtaining  an  understanding  of  internal  control  over
financial  reporting,  assessing  the  risk  that  a  material  weakness  exists,  and  testing  and  evaluating  the  design  and  operating  effectiveness  of  internal  control  based  on the  assessed  risk.  Our audit  also
included performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company's internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external  purposes  in  accordance  with  generally  accepted  accounting  principles.  A  company's  internal  control  over  financial  reporting  includes  those  policies  and  procedures  that  (1)  pertain  to  the
maintenance  of  records  that,  in  reasonable  detail,  accurately  and  fairly  reflect  the  transactions  and  dispositions  of  the  assets  of  the  company;  (2)  provide  reasonable  assurance  that  transactions  are
recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in
accordance  with  authorizations  of  management  and  directors  of  the  company;  and  (3)  provide  reasonable  assurance  regarding  prevention  or  timely  detection  of  unauthorized  acquisition,  use,  or
disposition of the company's assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to
the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, Kenon Holdings Ltd. maintained, in all material respects, effective internal control over financial reporting as of December 31, 2016, based on criteria established in Internal Control –
Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).

Kenon Holdings Ltd. acquired Distribuidora de Electricidad de Occidente, S. A. ('DEOCSA') and, Distribuidora de Electricidad de Oriente, S. A. ('DEORSA') during 2016, and management excluded
from its assessment of the effectiveness of Kenon Holdings Ltd.'s internal control over financial reporting as of December 31, 2016, DEOCSA's and DEORSA's internal control over financial reporting
associated with total assets and total revenues that constituted 16.4% percent and 27.1% percent, respectively, included in the consolidated financial statements of Kenon Holdings Ltd and subsidiaries,
as of and for the year ended December 31, 2016. Our audit of internal control over financial reporting of Kenon Holdings Ltd. also excluded an evaluation of the internal control over financial reporting
of DEOCSA and DEORSA.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated statements of financial position of Kenon Holdings Ltd. and
subsidiaries as of December 31, 2016 and 2015, and the related consolidated statements of profit and loss, other comprehensive income (loss), changes in equity, and cash flows for the years then ended,
and our report dated April 15, 2017 expressed an unqualified opinion on those consolidated financial statements .

/s/ KPMG LLP
KPMG LLP
Public Accountants and
Chartered Accountants

Singapore
April 15, 2017

KPMG  LLP  (Registration  No.  T0BLL1267L),  an  accounting
limited  liability  partnership  registered  in  Singapore  under  the
Limited  Liability  Partnership  Act  (Chapter  163A)  and  a  member
firm  of  the  KPMG  network  of  independent  member  firms
affiliated  with  KPMG  International
 Cooperative  ("KPMG
International"), a Swiss entitiy.

F - 2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Deloitte, Inc.
Contadores Públicos Autorizados
RUC 16292-152-155203 D.V. 65
Torre Banco Panamá, piso 12
Avenida Boulevard yIa Rotonda
Costa del Este, Panamá
Apartado 0816-01558
Panamá, Rep. de Panamá

Teléfono: (507) 303-4100
Fax: (507) 269-2386
infopanama@deloitte.com
www.deloitte.com/pa

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders of

Distribuidora de Electricidad de Occidente, S.A. and
Distribuidora de Electricidad de Oriente, S.A.
(Guatemalan entities)

We have audited the combined statement of financial position of Distribuidora de Electricidad de Occidente, S.A. and Distribuidora de Electricidad de Oriente, S.A. (together, the “Combined
Entities”) as of December 31, 2016, and the related combined statements of profit or loss and other comprehensive income, changes in shareholders’ equity, and cash flows for the year then ended
(not presented herein).  These combined financial statements are the responsibility of the Combined Entities’ management. Our responsibility is to express an opinion on these combined financial
statements based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain
reasonable assurance about whether the combined financial statements are free of material misstatement. The Combined Entities are not required to have, nor were we engaged to perform, an
audit of their internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in
the  circumstances,  but  not  for  the  purpose  of  expressing  an  opinion  on  the  effectiveness  of  the  Combined  Entities’  internal  control  over  financial  reporting.  Accordingly,  we  express  no  such
opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and
significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

In our opinion, such combined financial statements present fairly, in all material respects, the combined financial position of the Combined Entities as of December 31, 2016, and the combined
results of their operations and their cash flows for the year then ended in conformity with International Financial Reporting Standards, as issued by the International Accounting Standards Board.

Deloitte LATCO
Firma miembro de
Deloitte Touche Tohmatsu Limited

F - 3

  
 
 
 
 
 
 
 
As stated in Note 23 of the accompanying Combined Financial Statements, on December 2, 2016, a reduction in the capital stock was approved by the respective Combined Entities shareholders
through the decrease in the nominal value of the Combined Entities’ respective shares. According to Guatemala’s Commerce Code, the reduction of capital stock can be recorded only when it is
registered in the Commercial Register. As further indicated in Note 23, as of the date of issuance of the accompanying Combined Financial Statements the registration in the Commercial Register
is pending, and as such the above mentioned reduction was not recognized.

As stated in Note 30.c) of the accompanying combined financial statements, in July 2016, the Guatemalan Tax Authority (Superintendencia de Administración Tributaria, or the “SAT”) filed a
criminal complaint against DEOCSA and DEORSA, which requested the initiation of a criminal proceeding for tax fraud, and the payment of alleged back taxes, interest and fines in relation to
fiscal years 2011 and 2012, on the grounds that the structure of the 2011 acquisition of DEOCSA and DEORSA was used solely to generate tax deductions in respect of interest and amortization
of goodwill. As of December 31, 2016, the Combined Entities paid a total of approximately US$ 18,093 thousand (Q. 137,505 thousand) for the fiscal years 2014 and 2015; and on 19 August
2016, they paid a total of US$ 13,189 thousand (Q. 100,236 thousand) for the fiscal year 2013. In addition, during 2016 the Combined Entities made additional payments of income tax in advance
by Q. 40,729 thousand (US$ 5,393 thousand) corresponding to fiscal year 2016, not computing as deductible amounts the items related to goodwill, depreciation and interest that were subject of
the criminal complaint. The Combined Entities’ management considers, based on the opinion of its tax and legal advisors, that the receivable generated by these payments is more likely than not
to be recovered as a result of the final outcome of this criminal complaint and of the other recourses to be initiated by the Combined Entities.

/s/ Deloitte, Inc.

April 13, 2017
Panama, Republic of Panama

F - 4

 
 
 
 
Somekh Chaikin
KPMG Millennium Tower
17 Ha’arba’a Street, PO Box 609
Tel Aviv 61006, Israel
+972 3 684 8000

Report of Independent Registered Public Accounting Firm

The Board of Directors and Shareholders
Kenon Holdings Ltd.:

We have audited the accompanying combined carve-out statements of profit and loss, other comprehensive loss, changes in former parent company investment and cash flows of certain holdings of
Israel Corporation Ltd. (“Kenon Holdings, Carve-out”) for the year ended December 31, 2014. These combined carve-out financial statements are the responsibility of Kenon Holdings, Carve-out’s
management. Our responsibility is to express an opinion on these combined carve-out financial statements based on our audit.

We did not audit the financial statements of Tower Semiconductor Ltd. (Tower), (a 29% owned unconsolidated associated company as of December 31, 2014). Kenon Holdings, Carve-out’s equity in
profit of Tower was $18.3 million for the year 2014. The financial statements of Tower were audited by other auditors whose report was furnished to us, and our opinion, insofar as it relates to the
amounts included for Tower, is based solely on the report of the other auditors.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain
reasonable assurance about whether the combined carve-out financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and
disclosures in the combined carve-out financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the
overall financial statement presentation. We believe that our audit and the report of the other auditors provide a reasonable basis for our opinion.

In our opinion, based on our audit and on the report of the other auditors, the combined carve-out financial statements referred to above present fairly, in all material respects, the results of the
operations and cash flows of Kenon Holdings, Carve-out, as defined in Note 1D, for the year ended December 31, 2014, in conformity with International Financial Reporting Standards as issued by the
International Accounting Standards Board.

/s/ Somekh Chaikin
Somekh Chaikin
Certified Public Accountants (Isr)
A member firm of KPMG International

Tel Aviv, Israel

March 31, 2015

Somekh Chaikin, an Israeli partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity.

F - 5

 
 
 
 
 
 
 
 
 
 
 
 
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and the shareholders of 
Tower Semiconductor Ltd.

We have audited the consolidated statements of operations, comprehensive loss, changes in shareholders’ equity and cash flows for the year ended December 31, 2014(not presented separately herein)
of Tower Semiconductors Ltd. (the “Company”) and its subsidiaries. The consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an
opinion on the financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain
reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the
financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation.
We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the consolidated financial statements referred to above, present fairly, in all material respects the consolidated results of operations and cash flows of the Company and its subsidiaries
for the year ended December 31, 2014, in conformity with accounting principles generally accepted in the United States of America.

Brightman Almagor Zohar & Co.
Certified Public Accountants
A Member of Deloitte Touche Tohmatsu Limited

Tel Aviv, Israel 
March 4, 2015

Tel Aviv - Main Office
1 Azrieli Center
Tel Aviv, 6701101
P.O.B. 16593
Tel Aviv, 6116402
Tel: +972 (3) 608 5555
Fax: +972 (3) 609 4022
Info@deloitte.co.il

Trigger Foresight
3 Azrieli Center
Tel Aviv, 6702301

Ramat-Gan
6 Ha-rakun
Ramat Gan, 5252183

Jerusalem
12 Sarei Israel
Jerusalem, 9439024

Tel: +972 (3) 607 0500
Fax: +972 (3) 607 0501
Info@tfco.co.il

Tel: +972 (3) 755 1500
Fax: +972 (3) 676 9955
Info-ramatgan@deloitte.co.il

Tel: +972 (2) 501 8888
Fax: +972 (2) 537 4173
Info-jer@deloitte.co.il

Haifa
5 Ma'aleh Hashichrur
P.O.B. 5648
Haifa, 3105502

Tel: +972 (4) 860 7333
Fax: +972 (4) 867 2528
Info-haifa@deloitte.co.il

Beer-Sheva
Omer Industrial Park
Building No. 10
P.O.B. 1369
Omer, 8496500
Tel: +972 (8) 690 9500
Fax: +972 (8) 690 9600
Info-beersheva@deloitte.co.il

Eilat
The City Center
P.O.B. 583
Eilat, 8810402

Tel: +972 (8) 637 5676
Fax: +972 (8) 637 1628
Info-eilat@)deloitte.co.il

Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent
entity. Please see www.deloitte.com/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms.

F - 6

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Financial Position as at December 31, 2016 and 2015

Current assets
Cash and cash equivalents
Short-term investments and deposits
Trade receivables, net
Other current assets, including derivatives
Income tax receivable
Inventories

Total current assets

Non-current assets
Investments in associated companies
Deposits, loans and other receivables, including derivative instruments
Deferred taxes, net
Property, plant and equipment, net
Goodwill and intangible assets, net
Total non-current assets

Note

5
6
7
8

9

10
12
26
13
14

As at December 31

2016

2015

$ thousands

326,635 
89,545 
284,532 
49,773 
11,459 
91,659 

853,603 

208,233 
176,775 
25,104 
3,497,300 
376,778 
4,284,190 

383,953 
308,702 
123,273 
45,260 
3,926 
50,351 

915,465 

369,022 
88,475 
2,693 
2,959,878 
147,244 
3,567,312 

Total assets

5,137,793 

4,482,777 

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 7

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Financial Position as at December 31, 2016 and 2015, continued

As at December 31

2016

2015

Note

$ thousands

15
16
17
18
19

15
15
17
26
16

21

482,813 
285,612 
91,303 
56,833 
119,531 
8,671 
1,044,763 

1,972,926 
856,670 
44,637 
225,354 
44,057 
55,182 
3,198,826 

352,668 
145,454 
108,873 
— 
41,686 
4,705 
653,386 

1,709,063 
655,847 
35,625 
138,083 
— 
27,218 
2,565,836 

4,243,589 

3,219,222 

1,267,450 
26,559 
(21,745)  
11,575 
(602,598)  
681,241 
212,963 
894,204 

1,267,210 
— 
(16,916)
2,212 
(191,292)
1,061,214 
202,341 
1,263,555 

5,137,793 

4,482,777 

Current liabilities
Loans and debentures
Trade payables
Other payables, including derivative instruments
Guarantee deposits from customers
Provisions
Income tax payable
Total current liabilities

Non-current liabilities
Loans, excluding current portion
Debentures, excluding current portion
Derivative instruments
Deferred taxes, net
Trade payables
Other non-current liabilities
Total non-current liabilities

Total liabilities

Equity
Share capital
Shareholder transaction reserve
Translation reserve
Capital reserve
Accumulated deficit
Equity attributable to owners of the Company
Non-controlling interests
Total equity

Total liabilities and equity

Approval date of the consolidated financial statements: April 15, 2017

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 8

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Profit & Loss for the years ended December 31, 2016 and 2015

Kenon Holdings Ltd and combined entities
Combined statement of Profit & Loss for the year ended December 31, 2014

Continuing Operations
Revenue
Cost of sales and services (excluding depreciation)
Depreciation
Gross profit
Selling, general and administrative expenses
Gain from distribution of dividend in kind
Gain from disposal of investees
Gain on bargain purchase
Impairment of assets and investments
Dilution gains from reductions in equity interest held in associates
Other expenses
Other income
Operating profit from continuing operations

Financing expenses
Financing income
Financing expenses, net
Provision of financial guarantee
Share in losses of associated companies, net of tax
Profit from continuing operations before income taxes
Income taxes
(Loss)/Profit for the year from continuing operations
(Loss)/Profit for the year from discontinued operations
(Loss)/Profit for the year

Attributable to:
Kenon’s shareholders
Non-controlling interests
(Loss)/Profit for the year

Basic/diluted (loss)/profit per share attributable to Kenon’s shareholders (in dollars):
Basic/diluted profit/(loss) per share
Basic/diluted profit/(loss) per share from continuing operations
Basic/diluted profit/(loss) per share from discontinued operations

Note

22

23

10.C.a.3

24
24

25
25

10.C.b.6
10

26

28

27

2016

For the year ended December 31
2015
$ thousands

2014

1,873,922 
(1,358,570)  
(159,695)  
355,657 
(146,756)  

— 
— 
— 

(72,263)  

— 
(5,413)  
21,010 
152,235 

(189,599)  
18,481 
(171,118)  
(130,193)  
(185,592)  
(334,668)  
(59,334)  
(394,002)  

— 

(394,002)  

(411,937)  
17,935 
(394,002)  

(7.67)  
(7.67)  
— 

1,289,068 
(862,855)  
(110,917)  
315,296 
(103,823)  
209,710 
— 
— 
(6,541)  
32,829 
(7,076)  
15,450 
455,845 

(124,228)  
13,412 
(110,816)  

— 

(186,759)  
158,270 
(62,378)  
95,892 
— 
95,892 

72,992 
22,900 
95,892 

1.36 
1.36 
— 

1,372,230 
(981,141)
(100,434)
290,655 
(131,118)
— 
157,137 
68,210 
(47,844)
— 
(13,970)
51,037 
374,107 

(110,179)
16,243 
(93,936)
— 
(170,897)
109,274 
(103,341)
5,933 
470,421 
476,354 

458,161 
18,193 
476,354 

8.58 
(0.23)
8.81 

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Other Comprehensive Income (Loss) for the years ended December 31, 2016 and 2015

Kenon Holdings Ltd and combined entities
Combined Statement of Other Comprehensive Loss for the year ended December 31, 2014

2016

For the year ended December 31
2015
$ thousands

2014

(Loss)/Profit for the year

(394,002)  

95,892 

476,354 

Items that will be subsequently reclassified to profit or loss
Foreign currency translation differences in respect of foreign operations
Foreign currency translation differences in respect of foreign operations recognised in profit or loss
Change in fair value of derivatives used to hedge cash flows
Group’s share in other comprehensive loss of associated companies
Income taxes in respect of components other comprehensive (loss)/income
Components of net other comprehensive loss in respect from discontinued operations
Total

Items that will not be reclassified to profit or loss
Group’s share in net other comprehensive loss of associate companies

Total other comprehensive income/(loss) for the year
Total comprehensive (loss)/income for the year

Attributable to:
Kenon’s shareholders
Non-controlling interests

Total comprehensive (loss)/income for the year

157 
— 
14,397 
(3,968)  
(1,507)  
— 
9,079 

(18,132)  

— 
(6,365)  
(623)  
773 
— 

(24,347)  

— 

— 

9,079 
(384,923)  

(24,347)  
71,545 

(407,749)  
22,826 

(384,923)  

52,423 
19,122 

71,545 

(10,782)
(24,891)
(13,144)
(7,306)
2,303 
(4,025)
(57,845)

(3,978)

(61,823)
414,531 

400,815 
13,716 

414,531 

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 10

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Changes in Equity
For the years ended December 31, 2016 and 2015

Attributable to the Kenon’s shareholders

Share
Capital

Shareholder  
transaction  

reserve

Translation  

reserve

Capital
reserves

  Accumulated  
deficit

Total

Non-

controlling  

interests

Total

Balance at January 1, 2016
Share based payments
Dividend to holders of non-controlling
interests in a subsidiary
Acquisition of non- controlling interest
in subsidiary
Contribution from non-controlling
interest
Transactions with controlling
shareholder (see Note 10.C.b.7)
Gain in fair value of shareholder loan
(see Note 10.C.b.5)
Total comprehensive income for the
year
Net (loss)/profit for the year
Other comprehensive (loss)/income for
the year, net of tax
Balance at December 31, 2016

1,267,210 
240 

— 

— 

— 

— 

— 

— 

— 
1,267,450 

— 
— 

— 

— 

— 

3,540 

23,019 

— 

— 
26,559 

(16,916)  

— 

— 

— 

— 

— 

— 

— 

$ thousands

2,212 
307 

— 

— 

— 

— 

— 

— 

(191,292)  

— 

— 

670 

— 

— 

— 

1,061,214 
547 

202,341 
285 

1,263,555 
832 

— 

670 

— 

3,540 

23,019 

(35,255)  

(35,255)

20,325 

2,441 

— 

— 

20,995 

2,441 

3,540 

23,019 

(411,937)  

(411,937)  

17,935 

(394,002)

(4,829)  
(21,745)  

9,056 
11,575 

(39)  
(602,598)  

4,188 
681,241 

4,891 
212,963 

9,079 
894,204 

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 11

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd and combined entities
Consolidated Statements of Changes in Equity
For the years ended December 31, 2016 and 2015

Attributable to the Kenon’s shareholders

Non-

controlling  

interests

Total

Share
Capital

Former
Parent
company
investment

Translation  

reserve

Capital
reserves

  Accumulated  
deficit

Total

$ thousands

1,227,325 
— 

28,440 
— 

(25,274)  
556 

— 
— 

— 

1,230,491 
556 

207,207 
320 

1,437,698 
876 

— 

(12,340)  

(12,340)

(1,222)  

(1,222)  

(18,078)  

(19,300)

(8,552)  

— 

34,271 

— 

— 

— 

— 

— 

34,271 

6,110 

— 

6,110 

(241,741)  

(255,305)  

— 

(255,305)

— 

— 

— 

— 

— 

— 

30,718 
— 

— 

(13,402)  

— 
— 

— 
— 

— 
— 

— 

72,992 

72,992 

22,900 

95,892 

(17,414)  
(16,916)  

(3,788)  
2,212 

633 

(20,569)  

(191,292)  

1,061,214 

(3,778)  

202,341 

(24,347)
1,263,555 

The accompanying notes are an integral part of the combined financial statements.

F - 12

Balance at January 1, 2015
Share based payments
Dividend to holders of non-controlling
interests in a subsidiary
Acquisition of non- controlling interest
in subsidiary
Reclassification of net loss (pre spin-
off)
Contribution from former parent
company
Issuance of shares of subsidiary to
holders of non-controlling interests
Distribution of dividend in kind (see
note 10.C.c)
Issuance of common stock and
reclassification of former parent
company investment in connection with
the spin-off
Post spin-off adjustment
Total comprehensive income for the
year
Net profit for the year
Other comprehensive (loss)/income for
the year, net of tax
Balance at December 31, 2015

— 
— 

— 

— 

— 

— 

— 

(14,062)  

— 

— 

8,552 

34,271 

— 

— 

1,281,272 
— 

(1,283,550)  
13,402 

— 

— 
1,267,210 

— 

— 
— 

— 

— 

— 

— 

— 

498 

(28,440)  

— 

— 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd and combined entities
Combined Statement of Changes in Former Parent Company Investment, continued
For the year ended December 31, 2014

Attributable to the Kenon’s shareholders

Non-
controlling
interests

Total

Share
Capital

Former
Parent
company
investment

Translation
reserve

Capital
reserves
$ thousands

Total

— 

— 

— 
— 

— 

— 

— 
— 

— 

— 

— 

— 

— 
— 

658,654 

72,181 

(21,205)  

709,630 

236,180 

945,810 

— 

— 
— 

— 

— 

— 
— 

414,649 

(300,047)  

— 

458,161 

(4,092)  

1,227,325 

— 

— 
— 

— 

— 

— 
— 

— 

— 

— 

— 

— 

— 
— 

— 

— 

— 
5,444 

— 

— 

— 

— 

— 

— 
— 

— 

— 

— 
5,444 

414,649 

(300,047)  

— 

5,550 

5,550 

(17,518)  
(86,743)  

35,800 

19,577 

428 
— 

— 

— 

217 

(17,518)
(86,743)

35,800 

19,577 

428 
5,444 

414,649 

(300,047)

217 

458,161 

18,193 

476,354 

(43,741)  
28,440 

(9,513)  
(25,274)  

(57,346)  

1,230,491 

(4,477)  

207,207 

(61,823)
1,437,698 

The accompanying notes are an integral part of the combined financial statements.

F - 13

Balance at January 1, 2014
Acquisition of shares of
subsidiary from holders of
rights not conferring control
Dividend to holders of non-
controlling interests in a
subsidiary
Loss of control in a subsidary
Non-controlling interest in
respect of business combination  
Non-controlling shareholder
contribution
Share based payments in a
subsidiary
Share based payments in Kenon  
Contribution from former
parent company
Payments to former parent
company
Transactions with controlling
shareholders
Total comprehensive income
for the year
Income for the year
Other comprehensive loss for
the year, net of tax
Balance at December 31, 2014  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
      
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Cash Flows
For the years ended December 31, 2016 and 2015

Kenon Holdings Ltd and combined entities
Combined Statement of Cash Flows
For the year ended December 31, 2014

2016

For the year ended December 31
2015
$ thousands

2014

(394,002)  

95,892 

476,354 

172,381 
72,263 

171,118 
185,592 
2,534 
— 
— 
130,193 
4,896 
832 
— 
59,334 
405,141 
(40,076)  
(68,634)  
22,835 
(41,243)  
278,023 
(116,429)  

743 
162,337 

120,047 
6,541 

110,816 
186,759 
4,506 
(32,829)  
(209,710)  

— 
— 
876 
— 
62,378 
345,276 
4,361 
35,491 
(29,800)  
(33,426)  
321,902 
(36,218)  
4,487 
290,171 

188,171 
47,844 

195,405 
168,044 
(767,216)
— 
— 
— 
— 
8,413 
(68,210)
112,825 
361,630 
21,991 
(21,523)
29,830 
49,872 
441,800 
(66,198)
34,774 
410,376 

Cash flows from operating activities
(Loss)/Profit for the year
Adjustments:
Depreciation and amortization
Impairment of assets and investments
Financing expenses, net

Share in losses of associated companies, net
Capital losses/(gains), net *
Gain from changes in interest held in associates
Gain from distribution of dividend in kind
Provision for financial guarantee
Bad debt expense
Share-based payments
Gain on bargain purchase
Income taxes

Change in inventories
Change in trade and other receivables
Change in trade and other payables
Change in provisions and employee benefits
Cash generated from operating activities
Income taxes paid, net
Dividends received from investments in associates
Net cash provided by operating activities

* The amounts for 2016 and 2015 mainly relate to losses from disposal of property, plant and equipment. The amounts for 2014 mainly relate to the gain arising from the dilution of the investment in

subsidiary and disposal of investees.

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 14

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kenon Holdings Ltd and subsidiaries
Consolidated Statements of Cash Flows, continued
For the years ended December 31, 2016 and 2015

Kenon Holdings Ltd and combined entities
Combined Statement of Cash Flows, continued
For the year ended December 31, 2014

Cash flows from investing activities
Proceeds from sale of property, plant and equipment and intangible assets
Short-term deposits and loans, net
Cash paid for businesses purchased, less cash acquired
Disposal of subsidiary, net of cash disposed of and exit from combination
Investment in associates
Sale of securities held for trade and available for sale, net
Acquisition of property, plant and equipment
Acquisition of intangible assets
Interest received
Exit from the combination and transition to associate company less cash eliminated (See Note 28 (a))
Proceeds from sale of associate company
Payments for derivative investments used for hedging, net
Payment of consideration retained
Payment to release financial guarantee
Settlement of derivatives
Net cash used in investing activities

Cash flows from financing activities
Dividend paid to non-controlling interests
Proceeds from issuance of shares to holders of non-controlling interests in subsidiaries
Receipt of long-term loans and issuance of debentures
Repayment of long-term loans and debentures
Short-term credit from banks and others, net
Contribution from former parent company
Payments for transactions in derivative for hedging, net
Payment to the former parent company
Purchase of non-controlling interest
Interest paid
Net cash provided by financing activities

Decrease in cash and cash equivalents
Cash and cash equivalents at beginning of the year
Effect of exchange rate fluctuations on balances of cash and cash equivalents
Cash and cash equivalents at end of the year

Significant non-cash investing transactions:
Acquisition of fixed assets under lease contract
Purchase of fixed assets on credit and others

2016

For the year ended December 31
2015
$ thousands  

2014

426 
222,451 
(206,059)  

— 

(111,153)  
17,334 
(280,955)  
(9,598)  
6,143 
— 
— 
— 
(2,204)  
(36,023)  

— 

(399,638)  

(32,694)  
9,468 
799,481 
(444,976)  
(5,477)  
— 
— 
— 
— 

(151,241)  
174,561 

(62,740)  
383,953 
5,422 
326,635 

539 
(83,408)  
(9,441)  
— 

(129,241)  
13,217 
(515,838)  
(16,844)  
7,924 
— 
— 
— 
(3,795)  
— 
— 

(736,887)  

(12,340)  
6,110 
333,549 
(138,270)  
123,053 
34,271 
— 
— 

(20,000)  
(93,858)  
232,515 

(214,201)  
610,056 
(11,902)  
383,953 

17,449 
(253,097)
(67,180)
1,758 
(179,355)
— 
(425,184)
(11,496)
3,934 
(310,918)
359,891 
(16,100)
— 
— 
(2,038)
(882,336)

(17,518)
19,577 
744,183 
(173,868)
(86,072)
414,649 
(427)
(300,047)
— 
(170,885)
429,592 

(42,368)
670,976 
(18,552)
610,056 

— 

(24,620)  

— 

(46,327)  

(107,688)
(9,000)

The accompanying notes are an integral part of the consolidated/ combined financial statements.

F - 15

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
Note 1 – Financial Reporting Principles and Accounting Policies

A.

The Reporting Entity

Kenon Holdings Ltd.
Notes to the consolidated/ combined financial statements

Kenon Holdings Ltd (the “Company” or “Kenon”) was incorporated on March 7, 2014 in the Republic of Singapore under the Singapore Companies Act. Our registered office and principal place of
business is located at 1 Temasek Avenue #36-01, Millenia Tower, Singapore 039192.

The Company is a holding company and was incorporated to receive investments spun-off from their former parent company, Israel Corporation Ltd. (“IC”). The Company was formed to serve as the
holding  company  of  the  businesses  (together  referred  to  as  the  “Group”).  The  primary  focus  will  be  to  continue  to  grow  and  develop  the  primary  businesses,  I.C.  Power  Asia  Development  Ltd.
(formerly known as I.C. Power Ltd.) (“I.C. Power”) and Qoros Automotive Co., Ltd. ("Qoros").

On January 22, 2016, I.C. Power Distribution Holdings Pte Ltd (“ICP Distribution”) acquired Estrella Cooperatief BA group of companies collectively known as Energuate, see Note 11.A.1.a.

On March 21, 2016, as part of an internal restructuring, a wholly owned subsidiary, I.C. Power Pte. Ltd. “I.C. Power Singapore” (was subsequently renamed as I.C. Power Ltd.) acquired Kenon’s
subsidiary  I.C.  Power,  the  holding  company  for  Kenon’s  energy  generation  and  distribution  business.  As  a  result,  I.C.  Power  Singapore  is  now  the  parent  holding  company  of  Kenon’s  power
generation and distribution businesses.

B.

The split-up of Israel Corporation’s holdings

The  split-up  of  IC’s  holdings  on  January  7,  2015  involved  the  contribution  of  IC’s  holdings  in  I.C.  Power,  Qoros,  ZIM  Integrated  Shipping  Services  Ltd  (“ZIM”),  Tower  Semiconductor  Ltd.
(“Tower”) and other assets and entities, to Kenon, in exchange for shares of Kenon. Kenon’s shares were, in turn, distributed on January 9, 2015 to the shareholders of IC as a “dividend in kind”. IC’s
debt to banks and debenture holders remain in IC, and were not transferred to Kenon.

The split-up was completed on January 7, 2015 and on January 15, 2015 and January 11, 2015, Kenon shares were traded on New York Stock Exchange (NYSE) and on Tel Aviv Stock Exchange
(TASE) (NYSE and TASE: KEN) respectively.

After the split-up, I.C. Power is the primary subsidiary that Kenon holds. I.C. Power, through its operating subsidiaries and associates, provides electricity generation using different technologies such
as hydroelectric, natural gas and diesel turbines and heavy fuel oil engines in Peru, Chile, Colombia, Dominican Republic, Bolivia, El Salvador, Jamaica, Nicaragua, Guatemala and Israel.

1. The split-up included:

a)

b)

IC’s undertaking in the separation agreement (as detailed in Note 30H) with its then wholly owned subsidiary, Kenon, which included (among other things): (i) transfer of the holdings in the
companies being transferred to Kenon, as stated above, and transfer of certain rights and liabilities in relation to the companies being transferred from IC to Kenon; (ii) execution of an investment
in the capital of Kenon in the amount of $35 million and (iii) issuance of shares of Kenon to IC in respect of the assets and rights to be transferred from IC to Kenon and

IC’s  undertaking  in  a  loan  agreement  whereby,  among  other  things,  IC  provided  Kenon  a  credit  framework  in  an  aggregate  amount  of  up  to  $200  million,  Kenon  would  pay  an  annual
commitment fee equal to 2.1% of the undrawn amount of the credit facility and an annual interest of Libor+6% interest on the drawn amount, and in the framework thereof it will be provided that
in  a  case  of  realization  of  guarantees  that  IC  will  remain  responsible  for  with  respect  to  Qoros,  the  amount  for  which  IC  will  be  liable  in  a  case  of  realization  of  these  guarantees  will  be
considered a debt of Kenon to IC and the provisions of the loan agreement will apply to it. IC’s back-to-back guarantee of Qoros’ debt was fully released on January 4, 2016. As of December 31,
2016, Kenon has fully drawn its $200 million credit facility from IC.

In  March  2016,  Kenon  announces  an  amendment  to  its  loan  agreement  with  IC  and  related  pledge  arrangements  to  accommodate  the  new  holding  company  within  the  Group,  I.C.  Power
Singapore.

Based on the loan agreement, Kenon pledged 66% of I.C. Power shares held by Kenon. In relation to the internal reorganization above, the pledge effectively continues as Kenon pledged 66% of
its shares in I.C. Power Singapore to IC. Kenon also pledged 66% of certain intercompany debt receivables owing from I.C. Power Singapore to Kenon, which receivables resulted from this
internal restructuring.

F - 16

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 1 – Financial Reporting Principles and Accounting Policies (Con’t)

The pledge over the shares of I.C. Power Singapore and the related intercompany debt receivables were expected to be released following the consummation of an IPO of I.C. Power Singapore,
subject  to  Kenon’s  request,  and  provided  that  no  default,  breach  of  or  non-compliance  with  any  material  undertaking  or  material  condition  contained  in  the  loan  agreement  and  the  ratio  of
holdings value to net debt on such day is at least equal to 2:1 (See Note 11.A.3).

c) Distribution to IC’s shareholders as a dividend in kind of the shares of Kenon; including registration of these shares for trading, both on NYSE and on TASE;

C.

The internal restructuring of I.C. Power

In relation to the reorganization in Note 1.A, I.C. Power Singapore issued a $145 million note and $75 million note payable to Kenon. The proceeds of the notes were applied by I.C. Power Singapore
towards paying the purchase consideration for the acquisition of Kenon’s entire equity interest in I.C. Power. The notes both bear interest at a rate of LIBOR+6% per annum until the date the notes
are fully paid.

On October 12, 2016, Kenon received a $78 million payment from I.C. Power Singapore representing repayment of the $75 million note, together with accrued interest.

D.

The reporting periods prior to January 1, 2015

The reporting period for the year ended December 31, 2014 is presented as combined financial statements which have been derived from the consolidated financial statements of IC. The combined
financial  statements  reflect  the  revenues  and  expenses  directly  attributable  to  the  Company  and  its  Combined  Entities,  as  well  as  allocations  deemed  reasonable  by  management,  to  present  the
combined profit or loss and other comprehensive income, changes in former parent company investment and cash flows of the Company and its Combined Entities.

Outstanding balances, investments, transactions and cash flows between Group entities have been eliminated. Certain balances that were eliminated in the consolidation of the financial statements of
IC were reinstated in the combined financial statements when they relate to transactions with entities held by IC that were not transferred to the Group.

The  Combined  Carve-out  Financial  Statements  may  not  necessarily  be  indicative  of  Kenon’s  financial  position,  results  of  operating  activities  or  cash  flows  had  it  operated  as  a  separate  entity
throughout the period presented or for future periods.

Significant allocation and assumptions of the comparative financial information (for the year ended December 31, 2014):

The assumptions in this report are based on the terms of the separation agreement between IC and Kenon with respect to the assets and liabilities that were transferred to Kenon. Management has
used the following assumptions in developing the carve-out financial statements.

Allocation of expenses – Management allocated IC general and administrative expenses to the Group for the years ended December 31, 2014 and 2013 based on the time invested by IC management
in the Group’s respective holdings. In addition, the general and administrative expenses includes specific split expenses such as registration expenses were allocated to Kenon.

Debt and financial instruments – IC’s outstanding debt at the holding company level, other financial instruments and related finance expenses will not be transferred to Kenon and therefore were not
reflected in the combined financial statements.

Guarantees,  Loans  and  Capital  notes  from  IC  –  Guarantees  and  loans  (including  capital  notes)  from  IC  to  the  Group  companies  that  were  transferred  to  Kenon,  were  reflected  in  the  combined
financial statements. Kenon did not use this credit facility in the reporting period.

Contingent Liabilities – Existing IC contingent liabilities, including those related to litigation, were not transferred to Kenon.

Associates – Investments in associates which were transferred to Kenon are included in the combined financial statements.

Investments – Investments that have been made by IC in investee companies that were transferred to Kenon, and the financing of the Group, including holding company expenses, for the periods
shown, were treated as Contributions from former parent company in the statement of changes in former parent company investment.

Profit per share – On January 7, 2015, the split-up was completed and 53,383,015 ordinary shares were issued by Kenon. Therefore, the Profit per share in the combined financial statements is based
on this number of shares (in 2014 and 2013).

F - 17

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 1 – Financial Reporting Principles and Accounting Policies (Con’t)

E.

Definitions

In these consolidated/ combined financial statements -

1. Subsidiaries – Companies whose financial statements are fully consolidated with those of Kenon, directly or indirectly.

2. Combined Entities – Companies other than Kenon whose financial statements are fully combined with those of Kenon directly or indirectly.

3. Associates – Companies in which Kenon has significant influence and Kenon’s investment is stated, directly or indirectly, on the equity basis.

4. Investee companies – subsidiaries and/or associated companies.

5. Related parties – within the meaning thereof in International Accounting Standard (“IAS”) 24 “Related Parties” .

F - 18

 
 
 
 
 
 
 
 
 
Note 2 – Basis of Preparation of the Financial Statements

A.

Declaration of compliance with International Financial Reporting Standards (IFRS)

The consolidated/ combined financial statements were prepared by management of the Group in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International
Accounting Standards Board (“IASB”).

The consolidated/ combined financial statements were approved for issuance by the Company’s Board of Directors on April 15, 2017.

B.

Functional and presentation currency

These  consolidated/  combined  financial  statements  are  presented  in  US  dollars,  which  is  Kenon’s  functional  currency,  and  have  been  rounded  to  the  nearest  thousands,  except  when  otherwise
indicated. The US dollar is the currency that represents the principal economic environment in which Kenon.

C.

Basis of measurement

The consolidated/ combined financial statements were prepared on the historical cost basis, with the exception of the following assets and liabilities:

•

•

•

•

•

Derivative financial instruments.

Deferred tax assets and liabilities.

Provisions.

Assets and liabilities in respect of employee benefits.

Investments in associates.

For additional information regarding measurement of these assets and liabilities – see Note 3 “Significant Accounting Policies”.

D.

Use of estimates and judgment

The preparation of consolidated/ combined financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting
policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

The preparation of accounting estimates used in the preparation of the consolidated/ combined financial statements requires management of the Group to make assumptions regarding circumstances
and events that involve considerable uncertainty. Management prepares the estimates based on past experience, various facts, external circumstances, and reasonable assumptions according to the
pertinent circumstances of each estimate.

Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods
affected.

Following the Group’s business combination (“Note 11.A.1”), the Group had implemented additional accounting policies under the group of companies and information about assumptions made by
management of the Group with respect to the future and other reasons for uncertainty with respect to estimates that have a significant risk of resulting in a material adjustment to carrying amounts of
assets and liabilities in the next financial year are set forth below:

1.

Useful life of property, plant and equipment

Property, plant and equipment is depreciated using the straight-line method over its estimated useful life.

At every year-end, or more often if necessary, management examines the estimated useful life of the property, plant and equipment by comparing it to the benchmark in the relevant industry,
taking into account the level of maintenance and functioning over the years. If necessary, on the basis of this evaluation, the Group adjusts the estimated useful life of the property, plant and
equipment. A change in estimates in subsequent periods could materially increase or decrease future depreciation expense.

F - 19

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 2 – Basis of Preparation of the Financial Statements (Cont’d)

2.

Recoverable amount of non-financial assets and Cash Generating Units

Each reporting date, the management of the Group examines whether there have been any events or changes in circumstances which would indicate impairment of one or more of its non-
financial assets or Cash Generating Units (“CGUs”). When there are indications of impairment, an examination is made as to whether the carrying amount of the non-financial assets or CGUs
exceeds their recoverable amount, and if necessary, an impairment loss is recognized. Assessment of the impairment of goodwill and of other intangible assets having an indeterminable life is
performed at least once a year or when signs of impairment exist.

The recoverable amount of the asset or CGU is determined based on the higher of the fair value less selling costs of the asset or CGU and the present value of the future cash flows expected
from the continued use of the asset or CGU in its present condition, including the cash flows expected upon retiring the asset from service and its eventual sale (value in use).

The future cash flows are discounted to their present value using a discount rate that reflects current market assessments of the time value of money and the risks specific to the asset or CGU.

The  estimates  regarding  future  cash  flows  are  based  on  past  experience  with  respect  to  this  asset  or  similar  assets  (or  CGUs),  and  on  the  Group’s  best  possible  assessments  regarding  the
economic conditions that will exist during the remaining useful life of the asset or CGU.

The estimate of the future cash flows relies on the Group’s budget and other forecasts. Since the actual cash flows may differ, the recoverable amount determined could change in subsequent
periods, such that an additional impairment loss needs to be recognized or a previously recognized impairment loss needs to be reversed.

3.

Fair value of derivative financial instruments

The Group is a party to derivative financial instruments used to hedge foreign currency risks, interest risks and price risks. The derivatives are recorded based on their respective fair values.
The fair value of the derivative financial instruments is determined using acceptable valuation techniques that characterize the different derivatives, maximizing the use of observable inputs.
Fair  value  measurement  of  long-term  derivatives  takes  into  account  the  counterparties  credit  risks.  Changes  in  the  economic  assumptions  and/or  valuation  techniques  could  give  rise  to
significant changes in the fair value of the derivatives.

4.

Separation of embedded derivatives

Management of the Group exercises significant judgment in determining whether it is necessary to separate an embedded derivative from a host contract. If it is determined that the embedded
derivative is not closely related to the host contract and that it is necessary to separate the embedded derivative, this component is measured separately from the host contract as a financial
instrument at fair value through profit or loss. Otherwise, the entire instrument is measured in accordance with the measurement principles applicable to the host contract.

Changes in the fair value of separable embedded derivatives are recognized immediately in profit or loss, as financing income or expenses.

5.

Deferred tax assets

Deferred tax assets are recorded in relation to unutilized tax losses, as well as with respect to deductible temporary differences. Since such deferred tax assets may only be recognized where it
is probable that there will be future taxable income against which said losses may be utilized, use of discretion by management of the Group is required in order to assess the probability that
such future taxable income will exist. Management’s assessment is re-examined on a current basis and deferred tax assets are recognized if it is probable that future taxable income will permit
recovery of the deferred tax assets.

F - 20

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 2 – Basis of Preparation of the Financial Statements (Cont’d)

6.

Business Combinations

The Group accounts for business combinations using the acquisition method when control is transferred to the Group. The consideration transferred in the acquisition is measured at fair value,
as  are  the  identifiable  net  assets  acquired.  Any  goodwill  that  arises  is  tested  annually  for  impairment.  Any  gain  on  a  bargain  purchase  gain  is  recognized  in  profit  or  loss  immediately.
Transaction costs are expensed as incurred, except if related to the issue of debt or equity securities.

The consideration transferred does not include amounts related to the settlement of pre-existing relationships. Such amounts are recognized in profit or loss.

Any contingent consideration is measured at fair value at the acquisition date. If an obligation to pay contingent consideration that meets the definition of a financial instrument is classified as
equity, then it is not re-measured and settlement is accounted for within equity. Otherwise, subsequent changes to the fair value of the contingent consideration are recognized in profit or loss.

7.

Contingent Liabilities

From time to time, the Group is involved in routine litigation that arises in the ordinary course of business. Provisions for litigation are recognized as set out in Note 3(P). Contingent liabilities
for litigation and other claims do not result in provisions, but are disclosed in Note 20. The outcomes of legal proceedings with the Group are subjected to significant uncertainty and changes in
factors impacting management’s assessments could materially impact the consolidated financial statements.

Note 3 – Significant Accounting Policies

The principal accounting policies applied in the preparation of these consolidated/ combined financial statements are set out below. The Group has consistently applied the following accounting
policies to all periods presented in these consolidated/ combined financial statements, unless otherwise stated.

A.

Basis for consolidation/ combination

(1) Business combinations

Reorganizations in Common Control Transactions

Common control transactions of companies that involve the setup of a new group company and the combination of entities under common control are recorded using the book values of Group’s
parent company.

The Group accounts for all business combinations according to the acquisition method.

The acquisition date is the date on which the Group obtains control over an acquiree. Control exists when the Group is exposed, or has rights, to variable returns from its involvement with the
acquiree and it has the ability to affect those returns through its power over the acquiree. Substantive rights held by the Group and others are taken into account when assessing control.

The Group recognizes goodwill on acquisition according to the fair value of the consideration transferred less the net amount of the fair value of identifiable assets acquired less the fair value of
liabilities assumed.

If the Group pays a bargain price for the acquisition (meaning including negative goodwill), it recognizes the resulting gain in profit or loss on the acquisition date.

The Group recognizes contingent consideration measured at fair value at the acquisition date. The contingent consideration that meets the definition of a financial instrument that is not classified as
equity will be measured at fair value through profit or loss; except for non-derivative financial instrument contingent consideration which will be measured through other comprehensive income.

Furthermore, goodwill is not adjusted in respect of the utilization of carry-forward tax losses that existed on the date of the business combination.

Costs associated  with acquisitions  that were incurred  by the acquirer  in the business combination  such as: finder’s  fees, advisory,  legal, valuation  and other professional  or consulting  fees are
expensed in the period the services are received.

F - 21

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

(2)  

 Subsidiaries

Subsidiaries are entities controlled by the Company. The financial statements of subsidiaries are included in the consolidated financial statements from the date that control commences until the
date when control ceased. The accounting policies of subsidiaries have been changed when necessary to align them with the policies adopted by the Company.

The Company has no interest in structured entities as of December 31, 2016 and 2015.

(3)  

 Non-Controlling Interest (“NCI”)

NCI comprises the equity of a subsidiary or combined entity that cannot be attributed, directly or indirectly, to the parent company, and they include additional components such as: share-based
payments that will be settled with equity instruments of the subsidiaries and options for shares of subsidiaries.

NCI are measured at their proportionate share of the acquiree’s identifiable net assets at the acquisition date.

Changes in the Group’s interest in a subsidiary that do not result in a loss of control are accounted for as equity transactions.

Transactions with NCI, while retaining control

Transactions with NCI while retaining control are accounted for as equity transactions. Any difference between the consideration paid or received and the change in NCI is included directly in
equity.

Allocation of comprehensive income to the shareholders

Profit or loss and any part of other comprehensive income are allocated to the owners of the Group and the NCI. Total comprehensive income is allocated to the owners of the Group and the NCI
even if the result is a negative balance of NCI.

Furthermore, when the holding interest in the subsidiary changes, while retaining control, the Group re-attributes the accumulated amounts that were recognized in other comprehensive income to
the owners of the Group and the NCI.

Cash flows deriving from transactions with holders of NCI while retaining control are classified under “financing activities” in the statement of cash flows.

 (4) 

 Loss of control

Upon the loss of control, the Group derecognizes the assets and liabilities of the subsidiary, any NCI and the other components of equity related to the subsidiary. If the Group retains any interest
in the previous subsidiary, then such interest is measured at fair value at the date that control is lost. The difference between the sum of the proceeds and fair value of the retained interest, and the
derecognized balances is recognized in profit or loss under other income or other expenses. Subsequently, the retained interest is accounted for as an equity-accounted investee or as an available-
for-sale asset depending on the level of influence retained by the Group in the relevant company.

The amounts recognized in capital reserves through other comprehensive income with respect to the same subsidiary are reclassified to profit or loss or to retained earnings in the same manner that
would have been applicable if the subsidiary had itself realized the same assets or liabilities.

(5 )

Investments in equity-accounted investees

The Group’s interests in equity-accounted investees comprise interests in associates and a joint-venture.

Associates are entities in which the Group has the ability to exercise significant influence, but not control, over the financial and operating policies. In assessing significant influence, potential
voting rights that are currently exercisable or convertible into shares of the investee are taken into account.

Joint-venture is an arrangement in which the Group has joint control, whereby the Group has the rights to assets of the arrangement, rather than rights to its assets and obligations for its liabilities.

Associates and joint-venture are accounted for using the equity method (equity accounted investees) and are recognized initially at cost. The cost of the investment includes transaction costs. The
consolidated financial statements include the Group’s share of the income and expenses in profit or loss and of other comprehensive income of equity accounted investees, after adjustments to
align the accounting policies with those of the Group, from the date that significant influence commences until the date that significant influence ceases.

F - 22

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

The  Group’s  share  of  post-acquisition  profit  or  loss  is  recognized  in  the  income  statement,  and  its  share  of  post-acquisition  movements  in  other  comprehensive  income  is  recognized  in  other
comprehensive income with a corresponding adjustment to the carrying amount of the investment.

When the Group’s share of losses exceeds its interest in an equity accounted investee, the carrying amount of that interest, including any long-term interests that form part thereof, is reduced to
zero. When the Group’s share of long-term interests that form a part of the investment in the investee is different from its share in the investee’s equity, the Group continues to recognize its share
of the investee’s losses, after the equity investment was reduced to zero, according to its economic interest in the long-term interests, after the aforesaid interests were reduced to zero. When the
group’s share of losses in an associate equals or exceeds its interest in the associate, including any long-term interests that, in substance, form part of the entity’s net investment in the associate, the
recognition of further losses is discontinued except to the extent that the Group has an obligation to support the investee or has made payments on behalf of the investee.

 (6) Loss of significant influence

The Group discontinues applying the equity method from the date it loses significant influence in an associate and it accounts for the retained investment as a financial asset, as relevant.

On the date of losing significant influence, the Group measures at fair value any retained interest it has in the former associate. The Group recognizes in profit or loss any difference between the
sum of the fair value of the retained interest and any proceeds received from the partial disposal of the investment in the associate or joint venture, and the carrying amount of the investment on
that date.

Amounts recognized in equity through other comprehensive income with respect to such associates are reclassified to profit or loss or to retained earnings in the same manner that would have been
applicable if the associate had itself disposed the related assets or liabilities.

(7) Change in interest held in equity accounted investees while retaining significant influence

When the Group increases its interest in an equity accounted investee while retaining significant influence, it implements the acquisition method only with respect to the additional interest obtained
whereas the previous interest remains the same.

When there is a decrease in the interest in an equity accounted investee while retaining significant influence, the Group derecognizes a proportionate part of its investment and recognizes in profit
or loss a gain or loss from the sale under other income or other expenses.

Furthermore, on the same date, a proportionate part of the amounts recognized in equity through other comprehensive income with respect to the same equity accounted investee are reclassified to
profit or loss or to retained earnings in the same manner that would have been applicable if the associate had itself realized the same assets or liabilities.

 (8)

Intra-group Transactions

Intra-group  balances  and  transactions,  and  any  unrealized  income  and  expenses  arising  from  intra-group  transactions,  are  eliminated.  Unrealized  gains  arising  from  transactions  with  equity
accounted investees are eliminated against the investment to the extent of the Group’s interest in the investee. Unrealized losses are eliminated in the same way as unrealized gains, but only to the
extent that there is no evidence of impairment.

(9)

Reorganizations under Common Control Transactions

Common control transactions that involve the setup of a new group company and the combination of entities under common control are recorded using the book values of the parent company.

F - 23

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

B.

Foreign currency

(1)

Foreign currency transactions

Transactions in foreign currencies are translated into the respective functional currencies of Group entities at exchange rates at the dates of the transactions.

Monetary assets and liabilities denominated in foreign currencies at the reporting date are translated into the functional currency at the exchange rate at that date. Non-monetary items measured at
historical cost would be reported using the exchange rate at the date of the transaction.

Foreign currency differences are generally recognized in profit or loss, except for differences relating to qualifying cash flow hedges to the extent the hedge is effective which are recognized in
other comprehensive income.

(2)

Foreign operations

The  assets  and  liabilities  of  foreign  operations,  including  goodwill  and  fair  value  adjustments  arising  on acquisition,  are  translated  into  US  dollars  at  exchange  rates  at  the  reporting  date.  The
income and expenses of foreign operations are translated into US dollars at exchange rates at the dates of the transactions.

Foreign operation translation differences are recognized in other comprehensive income.

When the foreign operation is a non-wholly-owned subsidiary of the Group, then the relevant proportionate share of the foreign operation translation difference is allocated to the NCI.

When a foreign operation is disposed of such that control or significant influence is lost, the cumulative amount in the translation reserve related to that foreign operation is reclassified to profit or
loss as a part of the gain or loss on disposal.

Furthermore, when the Group’s interest in a subsidiary that includes a foreign operation changes, while retaining control in the subsidiary, a proportionate part of the cumulative amount of the
translation difference that was recognized in other comprehensive income is reattributed to NCI.

The Group disposes of only part of its investment in an associate that includes a foreign operation, while retaining significant influence, the proportionate part of the cumulative amount of the
translation difference is reclassified to profit or loss.

Generally, foreign currency differences from a monetary item receivable from or payable to a foreign operation, including foreign operations that are subsidiaries, are recognized in profit or loss in
the consolidated financial statements.

Foreign exchange gains and losses arising from a monetary item receivable from or payable to a foreign operation, the settlement of which is neither planned nor likely in the foreseeable future, are
considered to form part of a net investment in a foreign operation and are recognized in other comprehensive income, and are presented within equity in the translation reserve.

(A)  

 Consolidation of COBEE Financial Statements

The Bolivian government under the mandate of Evo Morales has nationalized companies that were privatized during President Gonzalo Sánchez de Lozada’s 1993-1997 administration and some
other companies that were never owned by the Bolivian government.

As of the date of this report, the Bolivian government has not taken any specific action nor threatened to take any specific action against COBEE. Currently, I.C. Power has full control of COBEE
´s operations and maintains all the associated economic rights and risks. Therefore, COBEE´s financial statements are consolidated in the accompanying consolidated financial statements.

F - 24

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

C.

Financial instruments

The Group classifies non-derivative financial assets into the following categories: financial assets at fair value through profit and loss, held-to-maturity financial assets, loans and receivables and
available-for-sale financial assets.

The Group classifies non- financial liabilities into the other financial liabilities categories.

 (1) Non-derivative financial assets and financial liabilities - recognition and de-recognition

The Group initially recognizes loans and receivables and debt securities issued on the date that they are originated. All other financial assets and financial liabilities are recognized initially on the
trade date.

The Group derecognizes a financial asset when the contractual rights to the cash flows from the asset expire, or it transfers the rights to receive the contractual cash flows in a transaction in which
substantially all of the risks and rewards of ownership and does not retains control over the transferred asset. Any interest in such derecognized financial asset that is created or retained by the
Group is recognized as a separate asset or liability.

The Group derecognizes a financial liability when its contractual obligations are discharged, or cancelled or expire.

Financial  assets  and  financial  liabilities  are  offset  and  the  net  amount  presented  in  the  consolidated  statement  of  financial  position  when,  and  only  when,  the  Group  currently  has  a  legally
enforceable right to offset the amounts and intends either to settle them on a net basis or to realize the asset and settle the liability simultaneously.

 (2) Non-derivative financial assets – measurement

Financial assets at fair value through profit and loss

A financial asset is classified at fair value through profit or loss if it is classified as held for trading or is designated as such on
initial recognition. Directly attributable transaction costs are recognized in profit or loss as incurred. Financial assets at fair value
through profit or loss are measured at fair value, and changes therein, including any interest or dividend income, are recognized
in profit or loss.

Held-to-maturity financial assets

These assets are initially recognized at fair value plus any directly attributable transaction costs. Subsequent to initial recognition,
they are measured at amortized cost using the effective interest method.

Loans and receivables

Available-for-sale financial assets

These assets are recognized initially at fair value plus any directly attributable transaction costs. Subsequent to initial recognition,
they are measured at amortized cost using the effective interest method, less any impairment losses.

These assets are recognized initially at fair value plus any directly attributable transaction costs. Subsequent to initial recognition,
they  are  measured  at  fair  value  and  changes  therein,  other  than  impairment  losses  and  foreign  currency  differences  on  debt
instruments,  are  recognized  in  Other  Comprehensive  Income  (“OCI”)  and  accumulated  in  the  fair  value  reserve.  When  these
assets are derecognized, the gain or loss accumulated in equity is reclassified to profit or loss.

 (3)  Non-derivative financial liabilities - Measurement

Non-derivative financial liabilities include loans and credit from banks and others, debentures, trade and other payables and finance lease liabilities.

Non-derivative financial liabilities are initially recognized at fair value plus any directly attributable transaction costs. Subsequent to initial recognition, these liabilities are measured at amortized
cost using the effective interest method.

F - 25

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

 (4) Derivative financial instruments and hedge accounting

The Group holds derivative financial instruments to hedge its foreign currency and interest rate risk exposures.

Derivatives are recognized initially at fair value; any directly attributable transaction costs are recognized in profit or loss as incurred. Subsequent to initial recognition, derivatives are measured at
fair value, and changes therein are generally recognized in profit or loss.

 (5) Cash flow hedges

When a derivative is designated as a cash flow hedging instrument, the effective portion of changes in the fair value of the derivative is recognized in OCI and accumulated in the hedging reserve
in equity. Any ineffective portion of changes in the fair value of the derivative is recognized immediately in profit or loss.

The amount accumulated in equity is retained in OCI and reclassified to profit or loss in the same period or periods during which the hedged item affects profit or loss.

If  the  hedging  instrument  no  longer  meets  the  criteria  for  hedge  accounting,  expires  or  is  sold,  terminated  or  exercised,  or  the  designation  is  revoked,  then  hedge  accounting  is  discontinued
prospectively. If the forecast transaction is no longer expected to occur, then the amount accumulated in equity is reclassified to profit or loss.

 (6) Financial guarantees

A financial guarantee is initially recognized at fair value. In subsequent periods,  a financial guarantee is measured at the higher of the amount recognized in accordance with the guidelines of IAS
37 Provisions, Contingent Liabilities and Contingent Assets, and the liability initially recognized under IAS 39 Financial Instruments: Recognition and Measurement and subsequently amortized
in accordance with the guidelines of IAS 18 Revenue. Any resulting adjustment of the liability is recognized in profit or loss.

D. Cash and Cash Equivalents

In the consolidated/ combined statement of cash flows, cash and cash equivalents includes cash on hand, deposits held at call with banks, other short-term highly liquid investments with original
maturities of three months or less.

E.

Property, plant and equipment, net

(1) Recognition and measurement

Items of property, plant and equipment comprise mainly power station structures, power distribution facilities and related offices. These items are measured at historical cost less accumulated
depreciation and accumulated impairment losses. Historical cost includes expenditure that is directly attributable to the acquisition of the items.

 •

The cost of materials and direct labor;

 • Any other costs directly attributable to bringing the assets to a working condition for their intended use;

 • When the Group has an obligation to remove the assets or restore the site, an estimate of the costs of dismantling and removing the items and restoring the site on which they are located; and

 • Capitalized borrowing costs.

If  significant  parts  of  an  item  of  property,  plant  and  equipment  items  have  different  useful  lives,  then  they  are  accounted  for  as  separate  items  (major  components)  of  property,  plant  and
equipment.

Any gain or loss on disposal of an item of property, plant and equipment is recognized in profit or loss in the year the asset is derecognized.

(2) Subsequent Cost

Subsequent expenditure is capitalized only if it is probable that the future economic benefits associated with the expenditure will flow to the Group, and its cost can be measured reliably.

(3) Depreciation

Depreciation is calculated to write off the cost of items of property, plant and equipment less their estimated residual values using the straight-line method over their estimated useful lives, and is
generally recognized in profit or loss. Leased assets are depreciated over the shorter of the lease term and their useful lives unless it is reasonably certain that the Group will obtain ownership by
the end of the lease term. Land is not depreciated.

F - 26

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

  The following useful lives shown on an average basis are applied across the Group:

Roads, buildings and leasehold improvements
Installations, machinery and equipment:
Thermal power plants

Hydro-electric plants
Wind power plants
Power generation and electrical

Dams
Office furniture, motor vehicles and other equipment
Substations, medium voltage equipment and transf.MV/LV
Meters and connections

Years
2 – 50

10 – 35
70 – 90
25
20
18 – 80
3 – 16
30 – 40
10 – 25

Depreciation methods, useful lives and residual values are reviewed by management of the Group at each reporting date and adjusted if appropriate.

F.

Intangible assets, net

(1) Recognition and measurement

      Goodwill

      Research and development

      Concessions

         Customer relationships

Goodwill  arising  on  the  acquisition  of  subsidiaries  is  measured  at  cost  less  accumulated  impairment  losses.  In  respect  of  equity  accounted
investees,  the  carrying  amount  of  goodwill  is  included  in  the  carrying  amount  of  the  investment;  and  any  impairment  loss  is  allocated  to  the
carrying amount of the equity investee as a whole.

Expenditures on research activities is recognized in profit and loss as incurred.
Development activities involve expenditures incurred in relation to the design and evaluation of future power plant projects before the technical
feasibility and commercial viability is fully completed, however the Group intends to and has sufficient resources to complete the development and
to use or sell the asset.
At  each  reporting  date,  the  management  of  the  Group  performs  an  evaluation  of  each  project  in  order  to  identify  facts  and  circumstances  that
suggest that the carrying amount of the assets may exceed their recoverable amount.

Intangible assets granted by the Energy and Mining Ministry of Guatemala to DEORSA and DEOCSA to operate power distribution business in
defined geographic areas, and acquired as part of business combination. The Group measures Concessions at cost less accumulated amortization
and any accumulated impairment losses.

Intangible assets acquired as part of a business combination and are recognized separately from goodwill if the assets are separable or arise from
contractual  or  other  legal  rights  and  their  fair  value  can  be  measured  reliably.  Customer  relationships  are  measured  at  cost  less  accumulated
amortization and any accumulated impairment losses.

         Other intangible assets

Other intangible assets, including licenses, patents and trademarks, which are acquired by the Group and have finite useful lives are measured at
cost less accumulated amortization and any accumulated impairment losses.

F - 27

 
 
 
 
 
   
 
   
  
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

(2) Amortization

Amortization  is  calculated  to  charge  to  expense  the  cost  of  intangible  assets  less  their  estimated  residual  values  using  the  straight-line  method  over  their  useful  lives,  and  is  generally
recognized in profit or loss. Goodwill is not amortized.

The estimated useful lives for current and comparative year are as follows:

· Concessions 
· Customer relationships
·
· Others

Software costs

33 years*
1-12 years
5 years
5-27 years

* The concessions are amortized over the remaining life of the licenses from the date of the business combination.

Amortization methods and useful lives are reviewed by management of the Group at each reporting date and adjusted if appropriate.

G.

Subsequent expenditure

Subsequent  expenditure  is  capitalized  only  when  it  increases  the  future  economic  benefits  embodied  in  the  specific  asset  to  which  it  relates.  All  other  expenditure,  including  expenditure  on
internally generated goodwill is expensed as incurred.

H. Transfer of assets from customers

In the distribution industry, an entity may receive from its customers items of property, plant and equipment that must be used to connect those customers to a network and provide them with
ongoing access to supply electricity. Alternatively, an entity may receive cash from customers for the acquisition or construction of such items of property, plant and equipment. In these cases,
where the Group determines that the items qualify for recognition as an asset, the transferred assets are recognized as part of the property plant and equipment in the statement of financial
position in accordance with IAS 16 and measured the cost on initial recognition at its fair value.

The transfer of an item of property, plant and equipment is an exchange for dissimilar goods or services. Consequently, the Group recognize revenue in accordance with IAS 18. The timing of
the recognition of the revenue arising from the transfer will take place once the Company has control on the assets and the customers are connected to the distribution network.

I.

Service Concession arrangements

The Group has examined the characteristics, conditions and terms currently in effect under its electric energy distribution license and the guidelines established by IFRIC 12. On the basis of such
analysis, the Group concluded that its license is outside the scope of IFRIC 12, primarily because the grantor does not control any significant residual interest in the infrastructure at the end of the
term of the arrangement and the possibility of renewal.

The Group accounts for the assets acquired or constructed in connection with the Concessions in accordance with IAS 16 Property, plant and equipment.

F - 28

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

J.

  Leases

(1) Leased assets

Assets held by the Group under leases that are transferred to the Group substantially all of the risks and rewards of ownership are classified as finance leases. The leased assets are measured
initially at an amount equal to the lower of their fair value and the present value of the minimum lease payments. Subsequent to initial recognition, the assets are accounted for in accordance
with the accounting policy applicable to that asset.

Asset held under other leases are classified as operating leases and are not recognized in the Group’s consolidated statement of financial position.

(2) Lease payments

Payments made under operating leases, other than conditional lease payments, are recognized in profit or loss on a straight-line basis over the term of the lease. Lease incentives received are
recognized as an integral part of the total lease expense, over the term of the lease.

Minimum lease payments made under finance leases are apportioned between the finance expense and the reduction of the outstanding liability. The finance expense is allocated to each period
during the lease term so as to produce a constant periodic rate if interest on the remaining balance of the liability.

K.

   Inventories

Inventories are measured at the lower of cost and net realizable value. Inventories consist of fuel, spare parts, materials and supplies. Cost is determined by using the average cost method.

L.

   Trade Receivable, net

Trade receivables are amounts due from customers for the energy and capacity in the ordinary course of business. If collection is expected in one year or less (or in the normal operating cycle of
the business if longer), they are classified as current assets. If not, they are presented as non-current assets.

Evidence of impairment of financial assets

The Group considers evidence of impairment for trade receivables at both a specific asset and collective level. All individually significant trade receivables are assessed for specific impairment.
All individually significant trade receivables found not to be specifically impaired are then collectively assessed for any impairment that has been incurred but not yet identified. Trade receivables
with similar risk characteristics that are not individually significant are collectively assessed for impairment.  In assessing collective impairment the Group uses historical trends of the probability
of default, timing of recoveries and the amount of loss incurred, adjusted for management’s judgment as to whether current economic and credit conditions are such that the actual losses are likely
to be greater or less than suggested by historical trends.

M.

   Borrowing costs

Specific  and non-specific  borrowing costs are  capitalized  to qualifying  assets throughout  the period  required  for completion  and construction  until  they are  ready  for their  intended use. Non-
specific borrowing costs are capitalized in the same manner to the same investment in qualifying assets, or portion thereof, which was not financed with specific credit by means of a rate which is
the  weighted-average  cost  of  the  credit  sources  which  were  not  specifically  capitalized.  Foreign  currency  differences  from  credit  in  foreign  currency  are  capitalized  if  they  are  considered  an
adjustment of interest costs. Other borrowing costs are expensed as incurred. Income earned on the temporary investment of specific credit received for investing in a qualifying asset is deducted
from the borrowing costs eligible for capitalization.

F - 29

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

N.

   Impairment

(1) Non-derivative financial assets

Financial  assets  not  classified  as  at  fair  value  through  profit  or  loss,  including  an  interest  in  an  equity-  account  investee,  are  assessed  by  management  of  the  Group  at  each  reporting  date  to
determine whether there is objective evidence of impairment.

Objective evidence that financial assets are impaired includes:

Indications that a debtor or issuer will enter bankruptcy;

· Default or delinquency by a debtor;
· Restructuring of an amount due to the Group on terms that the Group would not consider otherwise;
·
· Adverse changes in the payment status of borrowers or issuers;
· The disappearance of an active market for a security; or
· Observable data indicating that there is measurable decrease in expected cash flows from a group of financial assets.

For an investment in an equity security, objective evidence of impairment includes a significant or prolonged decline in its fair value below its cost.

            Financial Assets measured at amortized costs

Available-for-sale financial assets

             Equity-account investees

The Group considers evidence of impairment for these assets at both an individual asset and a collective level. All individually significant
assets are individually assessed for impairment. Those found not to be impaired are then collectively assessed for any impairment that has
been  incurred  but  not  yet  individually  identified.  Assets  that  are  not  individually  significant  are  collectively  assessed  for  impairment.
Collective assessment is carried out by grouping together assets with similar risk characteristics.

In assessing collective impairment, the group uses historical information on the timing of recoveries and the amount of loss incurred, and
makes  an  adjustment  if  current  economic  and  credit  conditions  are  such  that  the  actual  losses  are  likely  to  be  greater  or  lesser  than
suggested by historical trends.

An impairment loss is calculated as the difference between an asset's carrying amount and the present value of the estimated future cash
flows discounted at the asset's original effective interest rate. Losses are recognized in profit or loss and reflected in an allowance account.
When the Group considers that there are no realistic prospects of recovery of the asset, the relevant amounts are written off. If the amount
of  impairment  loss  subsequently  decreases  and  the  decrease  can  be  related  objectively  to  an  event  occurring  after  the  impairment  was
recognized, then the previously recognized impairment loss is reversed through profit or loss.

Impairment losses on available-for-sale financial assets are recognized by reclassifying the losses accumulated in the fair value reserve to
profit or loss. The amount reclassified is the difference between the acquisition cost (net of any principal repayment and amortization) and
the current fair value, less any impairment loss previously recognized in profit or loss. If the fair value of an impaired available-for-sale
debt  security  subsequently  increases  and  the  increase  can  be  related  objectively  to  an  event  occurring  after  the  impairment  loss  was
recognized, then the impairment loss is reversed through profit or loss; otherwise, it is reversed through OCI.

An impairment loss in respect of an equity-accounted investee is measured by comparing the recoverable amount of the investment with its
carrying amount. An impairment loss is recognized in profit or loss, and is reversed if there has been a favorable change in the estimates
used to determine the recoverable amount and only to the extent that the investment’s carrying amount, after the reversal of the impairment
loss, does not exceed the carrying amount of the investment that would have been determined by the equity method if no impairment loss
had been recognized.

F - 30

 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

  (2) Non-financial Assets

At  each  reporting  date,  management  of  the  Group  reviews  the  carrying  amounts  of  its  non-financial  assets  (other  than  inventories  and  deferred  tax  assets)  to  determine  whether  there  is  any
indication of impairment. If any such indication exists, then the asset’s recoverable amount is estimated. Goodwill is tested annually for impairment or whenever impairment indicators exist.

For impairment testing, assets are grouped together into smallest group of assets that generates cash inflows from continuing use that are largely independent of the cash inflows of other assets or
CGU. Goodwill arising from a business combination is allocated to CGUs or group of CGUs that are expected to benefit from these synergies of the combination.

The recoverable amount of an asset or CGU is the greater of its value in use and its fair value less costs to sell. Value in use is based on the estimated future cash flows, discounted to their present
value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset or CGU.

An impairment loss is recognized if the carrying amount of an asset or CGU exceeds its recoverable amount.

Impairment losses are recognized in profit or loss. They are allocated first to reduce the carrying amount of any goodwill allocated to the CGU, and then to reduce the carrying amounts of the
other assets in the CGU on a pro rata basis.

An impairment loss in respect of goodwill is not reversed. For other assets, an assessment is performed at each reporting date for any indications that these losses have decreased or no longer
exist. An impairment loss is reversed if there has been a change in the estimates used to determine the recoverable amount and  is reversed only to the extent that the asset’s carrying amount does
not exceed the carrying amount that would have been determined, net of depreciation or amortization, if no impairment loss had been recognized.

O. Employee benefits

(1)

Short-term employee benefits

Short-term employee benefits are expensed as the related service is provided. A liability is recognized for the amount expected to be paid if the Group has a present legal or constructive
obligation to pay this amount as a result of past service provided by the employee, and the obligation can be estimated reliably. The employee benefits are classified, for measurement
purposes, as short-term benefits or as other long-term benefits depending on when the Group expects the benefits to be wholly settled.

(2)

Bonus plans transactions

The  Group’s  senior  executives  receive  remuneration  in  the  form  of  share-appreciations  rights,  which  can  only  be  settled  in  cash  (cash-settled  transactions).  The  cost  of  cash-settled
transactions is measured initially at the grant date. With respect to grants made to OPC Rotem Ltd’s (“OPC”) senior executives, this benefit is calculated by determining the present
value of the settlement (execution) price set forth in the plan. The liability is re-measured at each reporting date and at the settlement date based on the formulas described above. Any
changes in the liability are recognized as operating expenses in profit or loss.

(3)

Termination Benefits

Severance pay is charged to income statement when there is a clear obligation to pay termination of employees before they reach the customary age of retirement according to a formal,
detailed plan, without any reasonable chance of cancellation, The benefits given to employees upon voluntary retirement are charged when the Group proposes a plan to the employees
encouraging voluntary retirement, it is expected that the proposal will be accepted and the number of employee acceptances can be estimated reliably.

(4)

Defined Benefit Plans

The  calculation  of  defined  benefit  obligation  is  performed  at  the  end  of  each  reporting  period  by  a  qualified  actuary  using  the  projected  unit  credit  method.  Remeasurements  of  the
defined benefit liability, which comprise actuarial gains and losses and the effect of the asset ceiling (if any, excluding interest), are recognized immediately in OCI. Interest expense and
other expenses related to defined benefit plan are recognized in profit or loss.

When the benefits of a plan are changed or when a plan is curtailed, the resulting change in benefit that relates to past service or the gain or loss on curtailment is recognized immediately
in profit or loss. The Group recognizes gains and losses on the settlement of a defined benefit plan when the settlement occurs.

F - 31

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

(5)

Share-based compensation plans

Qualifying employees are awarded grants of the Group’s shares under the Group’s 2014 Share Incentive Plan. The fair value of the grants are recognized as an employee compensation
expense, with a corresponding increase in equity. The expense is amortised over the service period – the period that the employee must remain employed to receive the benefit of the
award.  At  each  balance  sheet  date,  the  Group  revises  its  estimates  of  the  number  of  grants  that  are  expected  to  vest.  It  recognises  the  impact  of  the  revision  of  original  estimates  in
employee expenses and in a corresponding adjustment to equity over the remaining vesting period.

P.

Provisions

Provisions are recognized when the Group has a present legal or constructive obligation as a result of past events, it is probable that an outflow of resources embodying economic benefits
will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation.

Provisions are determined by discounting the expected future cash flows at a pre-tax rate that reflects current market assessments of the time value of money and the risks specific to the
liability. The unwinding of the discount is recognized as finance cost.

Q. Revenue recognition

(1) Revenue from electricity

Revenue is recognized to the extent that it is probable that the economic benefits will flow to the Group and the revenue can be reliably measured. Revenue comprises the fair value for the
sale of electricity, net of value-added-tax, rebates and discounts and after eliminating sales within the Group.

Revenues  from  the  sale  of  energy  are  recognized  in  the  period  during  which  the  sale  occurs.  The  revenues  from  the  generation  business  are  recorded  based  upon  output  delivered  and
capacity provided at rates specified pursuant to our Power Purchase Agreements (“PPAs”), or at marginal costs determined on the spot market, if the sales are made on the spot market.

Our revenues are determined substantially by long-term, U.S. dollar-linked PPAs. PPAs are usually entered into at prices that are equivalent to, or higher than, the prevailing spot market
rates,  the  majority  of  which  are  indexed  to  the  underlying  fuel  cost  of  the  related  long-term  supply  agreements.  Under  the  terms  of  the  majority  of  our  PPAs,  the  power  purchaser  is
contractually obligated to purchase its energy requirements, and sometimes capacity and/or ancillary services, from the power generator based upon a base price (denominated either in U.S.
Dollars or in the local currency) that is generally adjusted for a combination of some of the following: (1) fluctuations in exchange rates, (2) the U.S. inflation index, (3) a local inflation
index, (4) fluctuations in the cost of operating fuel, (5) supply costs of natural gas, and (6) transmission costs. Additionally, in Peru, PPAs include provisions that change the contractual
unitary energy prices in the case of an interruption of the supply or transportation of natural gas through the use of a methodology based on spot prices existing on the dates in which the
interruption event occurred. Many of the prices in our PPAs differentiate between peak and off-peak periods. As of December 31, 2016, the weighted average remaining life of our PPAs
based on firm capacity was 9 years.

Revenues from the operation  of electric  energy distribution and other income from exploitation  are measured at the fair value of the consideration  received.  Estimated customer  returns,
rebates and other similar allowances are deducted from the revenue recognized.

Revenues from the distribution of electric energy are recognized based on the energy delivered, through invoicing and the estimate of sales from the energy supplied which has not been
billed yet at the reporting date.

Revenues from toll services are recognized by the owner of the transmission, transformation or distribution facilities for allowing its use for the transportation of energy and capacity by a
third party.

F - 32

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

 (2) Revenue from shipping services and related expenses   (in associated company)

Revenue from cargo traffic is recognized in profit or loss in proportion to the stage of completion of the transaction at the balance sheet date. The stage of completion is assessed for each
cargo by the reference to the time-based proportion. The operating expenses related to cargo traffic are recognized immediately as incurred. If the incremental expenses related to the cargo
exceed the related revenue, the loss is recognized immediately in income statement.

(3) Revenue from vehicles (in associated company)

  (i) Sales of vehicles

Revenue from the sale of vehicles in the course of ordinary activities is measured at the fair value of the consideration received or receivable, net of value-added tax (“VAT”), consumption
tax  and  other  sales  taxes,  returns  or  allowances,  trade  discounts  and  volume  rebates.  Revenue  is  recognized  when  persuasive  evidence  exists,  usually  in  the  form  of  an  executed  sales
agreement, that the significant risks and rewards of ownership have been transferred to the customers, recovery of the consideration is probable, the associated costs and possible return of
vehicles can be estimated reliably, there is no continuing management involvement with the goods, and the amount of revenue can be measured reliably.

 (ii) Rental income of vehicles

Rental income from operating leases is recognized as revenue on a straight-line basis over the term of the lease. Lease incentives granted are recognized as an integral part of the total rental
income, over the term of the lease.

(iii) Licensing income

License fee and royalties received for the use of the Group’s assets (such as platform technology and patent) are normally recognized in accordance with the substance of the agreement.

(4) Revenue from biodiesel

Revenues are recorded if the material risks and rewards associated with ownership of the goods/merchandise sold have been assigned to the buyer. This usually occurs upon the delivery of
products and merchandise.

Revenue is recorded to the extent that it is probable that the economic benefits will flow to the Group and the amount of the revenues can be reliably measured.

R. Government grants

Government grants related to distribution projects are not recognized until there is reasonable assurance that the Group will comply with the conditions attaching to them and that the grants
will be received. Government grants are recorded at the value of the grant received and any difference between this value and the actual construction cost is recognized in profit or loss of the
year in which the asset is released.

Government grants related to distribution assets are deducted from the related assets. They are recognized in statement of income on a systematic basic over the useful life of the related asset
reducing the depreciation expense.

S.

Deposits received from consumers

Deposits  received  from  consumers,  plus  interest  accrued  and  less  any  outstanding  debt  for  past  services,  are  refundable  to  the  users  when  they  cease  using  the  electric  energy  service
rendered  by  the  Group.  The  Group  has  classified  these  deposits  as  current  liabilities  since  the  Group  does  not  have  legal  rights  to  defer  these  payments  in  a  period  that  exceed  a  year.
However, the Group does not anticipate making significant payments in the next year.

T.

Transfer of assets from customers

In the power distribution industry, an entity may receive from its customer items in the form of property, plant and equipment that are used to connect these customers to a network with
continuous access to power supply. Alternatively, an entity may receive cash from customers in return for the acquisition or construction of such items of property, plant and equipment. In
such cases, where the Group determines that these items qualify for recognition as an asset, the transferred assets are recognized as part of the property plant and equipment in the statement
of financial position in accordance with IAS 16 and measured its cost on initial recognition at its fair value.

F - 33

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

The transfer of an item of property, plant and equipment would be an exchange for dissimilar goods or services. Consequently, the Group recognizes revenue in accordance with IAS 18. The
timing of the recognition of the revenue arising from the transfer will depend on the separately identifiable service included in the agreement.

U.

Service concession arrangements

The Group has examined the characteristics, conditions and terms currently in effect under its electric energy distribution license and the guidelines established by IFRIC 12. On the basis of
such analysis, the Group concluded that its license is outside the scope of IFRIC 12, primarily because the grantor does not control any significant residual interest in the infrastructure at the
end of the term of the arrangement and the possibility of renewal.

The Group accounts for the assets acquired or constructed in relation to the Concessions in accordance with IAS 16 Property, plant and equipment.

V. Guarantee deposits from customers

Deposits received from customers, plus interest accrued and less any outstanding debt for past services, are refundable to the users when they cease using the electric energy service rendered
by the Group. The Group has classified these deposits as current liabilities since the Group does not have legal rights to defer these payments in a period that exceed a year. However, the
Group does not anticipate making significant payments in the next year.

W. Energy purchase

Costs from energy purchases either acquired in the spot market or from contracts with suppliers are recorded on an accrual basis according to the energy actually delivered. Purchases of
electric energy, including those which have not yet been billed as of the reporting date, are recorded based on estimates of the energy supplied at the prices prevailing in the spot market or
agreed-upon in the respective purchase agreements, as the case may be.

X.

Financing income and expenses

Financing income includes income from interest on amounts invested and gains from exchange rate differences. Interest income is recognized as accrued, using the effective interest method.

Financing expenses include interest on loans received, commitment fees on borrowings, and changes in the fair value of derivatives financial instruments presented at fair value through
profit or loss, and exchange rate losses. Borrowing costs, which are not capitalized, are recorded in the income statement using the effective interest method.

In the statements of cash flows, interest received is presented as part of cash flows from investing activities. Dividends received are presented as part of cash flows from operating activities.
Interest paid and dividends paid are presented as part of cash flows from financing activities. Accordingly, financing costs that were capitalized to qualifying assets are presented together
with interest paid as part of cash flows from financing activities. Gains and losses from exchange rate differences and gains and losses from derivative financial instruments are reported on a
net basis as financing income or expenses, based on the fluctuations on the rate of exchange and their position (net gain or loss).

The Group’s finance income and finance costs include:

·
·
·
·
·
·
·
·
·

Interest income;
Interest expense;
The net gain or loss on the disposal of available-for-sale financial assets;
The net gain or loss on financial assets at fair value through profit or loss;
The foreign currency gain or loss on financial assets and financial liabilities;
The fair value loss on contingent consideration classified as financial liability;
Impairment losses recognized on financial assets (other than trade receivables);
The net gain or loss on hedging instruments that are recognized in profit or loss; and
The reclassification of net gains previously recognized in OCI.

Interest income or expense is recognized using the effective interest method.

F - 34

 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

Y.

Income taxes

Income tax expense comprises current and deferred tax. It is recognized in profit or loss except to the extent that it relates to a business combination, or items recognized directly in equity or
in OCI.

(i) Current tax

Current tax comprises the expected tax payable or receivable on the taxable income or loss for the year and any adjustment to tax payable or receivable in respect of previous years. It is
measured using tax rates enacted or substantively enacted at the reporting date. Current tax also includes any tax liability arising from dividends.

Current tax assets and liabilities are offset only if certain criteria are met.

(ii) Deferred tax

Deferred  tax  is  recognized  in  respect  of  temporary  differences  between  the  carrying  amounts  of  assets  and  liabilities  for  financial  reporting  purposes  and  the  amounts  used  for  taxation
purposes. Deferred tax is not recognized for:

•

•

•

Temporary differences on the initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit or loss;

Temporary  differences  related  to  investments  in  subsidiaries  and  associates  where  the  Group  is  able  to  control  the  timing  of  the  reversal  of  the  temporary  differences  and  it  is  not
probable that they will reverse it in the foreseeable future; and

Taxable temporary differences arising on the initial recognition of goodwill.

Deferred tax assets are recognized for unused tax losses, unused tax credits and deductible temporary differences to the extent that it is probable that future taxable profits will be available
against which they can be used. Deferred tax assets are reviewed at each reporting date and are reduced to the extent that it is no longer probable that the related tax benefit will be realized;
such reductions are reversed when the probability of future taxable profit improves.

Unrecognized deferred tax assets are reassessed at each reporting date and recognized to the extent that it has become probable that future taxable profits will be available against which they
can be used.

Deferred tax is measured at the tax rates that are expected to be applied to temporary differences when they reverse, using tax rates enacted or substantively enacted at the reporting date.

Deferred tax assets and liabilities are offset if there is a legally enforceable right to offset current tax liabilities and assets, and they relate to taxes levied by the same tax authority on the
same taxable entity, or on different tax entities, but they intend to settle current tax liabilities and assets on a net basis or their tax assets and liabilities will be realized simultaneously.

Management of the Group regularly reviews its deferred tax assets for recoverability, taking into consideration all available evidence, both positive and negative, including historical pre-tax
and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given
to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

Management believes the Group’s tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to
be sustained upon examination by tax authorities. The Group believes that its liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for
additional tax assessments. There is a risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our
income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

F - 35

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

 (iii) Uncertain tax positions

A provision for uncertain tax positions, including additional tax and interest expenses, is recognized when it is more probable than not that the Group will have to use its economic resources
to pay the obligation.

Z. Earnings per share

The Group presents basic and diluted earnings per share data for its ordinary share capital. The basic earnings per share are calculated by dividing income or loss allocable to the Group’s
ordinary equity holders by the weighted-average number of ordinary shares outstanding during the period. The diluted earnings per share are determined by adjusting the income or loss
allocable to ordinary equity holders and the weighted-average number of ordinary shares outstanding for the effect of all potentially dilutive ordinary shares including options for shares
granted to employees.

AA. Share capital – ordinary shares

Incremental costs directly attributable to the issue of ordinary shares, net of any tax effects, are recognized as a deduction from equity.

Distribution of Non-Cash Assets to owners of the Company

The Group measures a liability to distribute non-cash assets as a dividend to the owners of the Group at the fair value of the assets to be distributed. The carrying amount of the dividend is
remeasured at each reporting date and at the settlement date, with any changes recognized directly in equity as adjustments to the amount of the distribution. On settlement of the transaction,
the Group recognized the difference, if any, between the carrying amounts of the assets distributed and the carrying amount of the liability in profit or loss. Distribution of non-cash assets are
distributed to shareholders when the shareholder is given a choice of taking cash in lieu of the non-cash assets.

BB. Discontinued operation

A discontinued operation is a component of the Group´s business, the operations and cash flows of which can be clearly distinguished from the rest of the Group and which:

·

·

·

Represents a separate major line of business or geographic area of operations,

Is part of a single coordinated plan to dispose of a separate major line of business or geographic area of operations; or

Is a subsidiary acquired exclusively with a view to re-sell.

Classification  as  a  discontinued  operation  occurs  at  the  earlier  of  disposal  or  when  the  operation  meets  the  criteria  to  be  classified  as  held-for-sale.  When  an  operation  is  classified  as  a
discontinued operation, the comparative statement of profit or loss and other comprehensive income is re-presented as if the operation had been discontinued from the start of the comparative
year.

In the cash flow, the cash balance from discontinued operation is disclosed in a separate line. The changes based on operating, investing and financing activities are reported in Note 28.

F - 36

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

CC. Operating Segment and Geographic Information

The Company's CEO and CFO are considered to be the Group's chief operating decision maker ("CODM").  Based on the internal financial information provided to the CODM, the Group
has determined that it has three reportable segments in 2016, which are I.C. Power Generation segment, I.C. Power Distribution segment and Qoros segment.  In addition to the segments
detailed above, the Group has other activities, such as a shipping services and renewable energy businesses categorized as Other.

The  CODM  evaluates  the  operating  segments  performance  based  on  Adjusted  EBITDA.  Adjusted  EBITDA  is  defined  as  the  net  income  (loss)  excluding  depreciation  and  amortization,
financing income, income taxes and other items.

The CODM evaluates segment assets based on total assets and segment liabilities based on total liabilities.

The accounting policies used in the determination of the segment amounts are the same as those used in the preparation of the Group's consolidated financial statement, Inter-segment pricing
is determined based on transaction prices occurring in the ordinary course of business.

In determining of the information to be presented on a geographic basis, revenues are based on the geographic location of the customer and non-current assets are based on the geographic
location of the assets.

DD. Transactions with controlling shareholders

Assets, liabilities and benefits with respect to which a transaction is executed with the controlling shareholders are measured at fair value on the transaction date. The Group records the
difference between the fair value and the consideration in equity.

EE. New standards and interpretations not yet adopted

A number of new standards and amendments to standards and interpretations are effective for annual periods beginning after 1 January 2017, and have not been applied in preparing these
consolidated financial statements. None of these is expected to have a significant effect on the consolidated financial statements of the Group, except the following set out below:

F - 37

 
 
 
 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

1)

International Financial Accounting Standard IFRS 9 (2014) “ Financial Instruments ” – replaces the existing guidance in IAS 39 Financial Instruments: Recognition and Measurement
. IFRS 9 includes revised guidance on the classification and measurement of financial instruments, a new expected credit loss model for calculating impairment on financial assets, and new
general hedge accounting requirements. It also carries forward the guidance on recognition and derecognition of financial instruments from IAS 39.

The Standard is to be applied for annual periods commencing on or after January 1, 2018, with the possibility of early adoption. The Standard is to be applied retroactively,  except in a
number of circumstances. Management of the Group is examining the effects of IFRS 9 on the financial statements with no plans for early adoption.

The Group has examined IFRS 9 in order to determine the qualitative impacts of the implementation. As of 31 December 2016, the Group is not able to determine the quantitative impact and
considers that the overall impact of the implementation of IFRS 9 will be immaterial to the Group.

The examination of the potential qualitative impacts was conducted, considering the following three main areas of IFRS 9:

a) Classification of financial assets

There are no material impacts expected concerning the classification and measurement of financial assets due to the types of financial assets held by the Group entities. The Group does not
hold complex financial assets nor enters in complex structured financing transaction such as securitization transactions, factoring-arrangements, etc.

b)

Impairment of financial assets

In general, the most important financial assets of the Group, trade receivables, do not contain a significant financing component. Therefore, the simplified approach as established in IFRS 9
is recommended to be applied. According to IFRS 9, provision matrix may be used to estimate expected credit losses (“ECL”) for these financial instruments without the use of hindsight of
a default, and the matrix would include expectations of variations in credit risks of customers for the lifetime. Thus, the recognition of losses would be based on the maximum period over
which ECL which is the maximum contractual period over which the entity is exposed to credit risk from the first day of the recognition of the receivable.

The  Group  expects  that  the  application  of  IFRS  9  will  impact  both  power  generation  and  distribution  businesses,  but  substantially  on  the  distribution  business  due  to  the  underlying
characteristics  of  this  business  with  numerous  private  customers  with  different  credit  characteristics,  compared  to  the  generation  business  with  regulated  customers  and  only  few  non-
regulated customers, resulting in:

·

Changes to the current matrix, including historical and forward looking information.

With consideration of both IFRS 7 and IFRS 9, it introduces new disclosure requirements to disclosures relating to an impairment.

c) Hedge Accounting

The  Group  has  not  decided  on  continuing  with  the  hedge  accounting  requirements  under  IAS  39  “  Financial  Instruments:  Recognition  and  Measurement”  or  to  adopt  the  new  hedge
accounting requirements under IFRS 9. If the Group decides to apply the new hedge accounting requirements, it would require the Group to restore balance or equilibrium to existing hedges
on transition to fulfill the new effectiveness requirements under the new hedge accounting requirements. The resulting gain or loss would be recognized in profit and loss. The applicable will
be in relation to Cardones’ and Amayo’s interest rate swap derivatives.

d) Modification of financial liabilities measured at amortized cost that do not result in de-recognition

When a financial liability measured at amortized cost is modified without this resulting in de-recognition, a gain or loss should be recognized in profit or loss. Therefore the Group should
evaluate the changes to the current accounting policy and should estimate the impacts resulting from the retrospective application from modification gains and losses arising from financial
liability from Kallpa bond issuance that are still recognized at the date of initial application of IFRS 9, adjustments might have need to be calculated and recorded through opening retained
earnings on transition.

F - 38

 
 
 
 
Note 3 – Significant Accounting Policies (Cont’d)

2)

International Financial Accounting Standard IFRS 15 “Revenues  from Contracts  with Customers”  – the Standard replaces the presently existing guidelines regarding recognition of
revenue from contracts with customers and provides two approaches for recognition of revenue: at one point in time or over time. The model includes five stages for analysis of transactions
in order to determine the timing of recognition of the revenue and the amount thereof. In addition, the Standard provides new disclosure requirements that are more extensive that those
currently in effect.

The  Standard  is  to  be  applied  for  annual  periods  commencing  on  January  1,  2018,  with  the  possibility  of  early  adoption.  The  Standard  includes  various  alternatives  with  respect  to  the
transitional rules, such that companies may choose one of the following alternatives when applying the Standard for the first time: full retroactive application, full retroactive application with
practical relaxations or application of the Standard commencing from the initial application date, while adjusting the balance of the retained earnings as at this date for transactions that have
not yet been completed.

The Group has conducted an initial assessment in order to determine the qualitative impacts of the implementation of IFRS 15. As of December 31, 2016, the Group is not able to determine
quantitative impacts, however, under a qualitative point of view it is expected to have impacts in the following aspects, which are described below according to areas affected by the new
standard and for each business unit.

With respect to the power generation business, the Group expects impacts on the following:

·

·

·

Identification  of  the  contract:  Selective  Group’s  contracts  are  subject  to  changes  in  scope  or  prices  that  requires  evaluation  to  determine  treatment  of  modification  based  on
considerations to separate contracts or evaluate as integral part of the original contracts.
Performance obligations: Recognition of revenue of performance obligations that are currently not accounted for separately such as promises to make available capacity or energy on
demand, and renewal options that qualify as a material right. On the other hand, recognition of revenue of transmission services paid on behalf of some customers and subsequently
reimbursed are expected not to qualify as separate performance obligations, thus, no gross revenue should be recognized due to the fact that the group would be acting as an agent and a
netting presentation of payment of reimbursements in the statement of profit or loss is reasonable.
Transaction price: The Group’s contracts with customers contain variable factors that may affect its cash flow, such as stepped pricing, volume discounts, adjustments based on fuel
price or operating conditions of Sistema Eléctrico Interconectado Nacional del Peru (“SEIN”) and penalties. All these features may impact the determination of the transaction price,
thus, the Group expects the application of a high degree of judgment to estimate the amount of these variable consideration.

· Allocation of the transaction price: For the allocation of the transaction price, the Group expects certain challenges to determine the stand alone selling prices of the several performance
obligations. The Group expects to apply significant judgment to determine the stand-alone selling price for the supply energy and the other performance obligations that are not being
separately recognized.
Recognition of revenue: Apart from the separation of the transaction prices in various performance obligations, the Group expects no significant impact in the timing of the revenue
recognition  of  the  major  service  (energy  and  capacity  supply),  this  corresponds  to  a  series  of  different  promises  that  may  be  treated  as  a  single  performance  obligation  that  may  be
recognized overtime, similar to the current treatment.

·

· Other matters: the Group expects an enhancement in the disclosures that relates to revenue. In addition, with respect to transition, the Group plans to evaluate the results of the initial

quantification of the impacts of the new standard for decision-making about the transition method to be applied.

F - 39

 
 
Note 3 – Significant Accounting Policies (Cont’d)

With respect to the distribution business, the Group expects impacts on the following topics:

·
·

·

·
·

Treatment of modifications of contracts as described in the preceding generation business section above.
Performance obligations: Some new performance obligations has been identified, for example, certain administrative activities that the Group carries out on behalf of some customers
(municipalities). However, the Group estimate this may be considered as not material obligations.
Transaction price: The Group identifies variable consideration associated with unbilled energy. Although, this concept is currently recognized as revenue, it is expected to change the
method to quantify it. In addition, considering the collectability criteria are met for those contracts, there is a significant financing component concerning contracts with customers with
payment agreements. These agreements allow the customers to pay in arrears (ranging from 8 to 120 months). The practical expedient to not adjust the transaction price for the time
value of money cannot be used for payment terms which establish that the period between performance and payment for that performance is more than one year. Another impact is the
determination of the discount rate. This rate should reflect the individual credit risk of the specific customer. To date, the discount rate used is that published quarterly by the Regulator,
Comisión Nacional de Energía Eléctrica (“CNEE”).
Allocation of the transaction price: Similar to the generation business.
Other matters: the Group expects an enhancement in the disclosures that relates to revenue. In addition, with respect to transition, the Group plans to evaluate the results of the initial
quantification of the impacts of the new standard for decision-making about the transition method to be applied.

In addition, the Group is currently evaluating the impacts on internal controls and processes. The next steps include the preparation of an implementation plan and further trainings to the
employees in order to ensure a successful implementation.

3)

International Financial Accounting Standard IFRS 16 “ Leases ” The standard replaces IAS 17 – Leases and its related interpretations.  The standard's instructions annul the existing
requirement from lessees to classify leases as operating or finance leases. Instead of this, for lessees, the new standard presents a unified model for the accounting treatment of all leases
according  to  which  the  lessee  has  to  recognize  an  asset  and  liability  in  respect  of  the  lease  in  its  financial  statements.  Similarly,  the  standard  determines  new  and  expanded  disclosure
requirements from those required at present. The standard will become effective for annual periods commencing on or after January 1, 2019, with the possibility of early adoption, so long as
the Group has also early adopted IFRS 15 – Revenue from contracts with customers. The standard includes a number of alternatives for the implementation of transitional provisions, so that
companies can choose one of the following alternatives at the implementation date: full retrospective implementation or implementation from the effective date while adjusting the balance of
retained earnings at that date.

The Group’s initial assessment is in progress to examine the impacts for future implementation of IFRS 16.

F - 40

 
 
 
 
 
 
 
  Note 4 – Determination of Fair Value

As part of its accounting policies and disclosure requirements, management of the Group is required to determine the fair value of both financial and non-financial assets and liabilities. The fair
values have been determined for purposes of measurement and/or disclosure based on the following methods. Additional information regarding the assumptions used in determining the fair values
is disclosed in the notes relating to that asset or liability. A number of the Group's accounting policies and disclosures require the measurement of fair values, for both financial and non-financial
assets and liabilities.

The Group has an established control framework with respect to the measurement of fair values.

When relevant observable market data does not exist, or when observable inputs require significant adjustment based on unobservable inputs, fair values are determined using a valuation technique
based primarily on the Company’s internal assumptions about future cash flows and appropriately risk-adjusted discount rates. Regardless of the valuation technique used, that technique should not
ignore relevant information and reflect appropriate risk adjustments that market participants would make for credit and liquidity risks.

Based on each valuation scenario, management of the Group will decide on the use of observable transaction prices to the extent they represent the fair value of the instrument and consider using
unobservable  inputs  when  it  is  more  appropriate  than  using  observable  inputs.    If  they  do  not  represent  the  fair  value  of  the  instrument,  and  significant  adjustments  need  to  be  made  to  the
observable transaction prices, it might be more appropriate for the Group to use a valuation technique based on unobservable inputs.

In  other  scenarios,  multiple  inputs  from  different  sources  may  collectively  provide  the  best  evidence  of  fair  value  with  the  expected  cash  flows  considered  alongside  such  information.    The
weighting of these inputs in the  fair value measurement  would depend on the extent  to which they provide  information  about the fair  value of the instrument  and are relevant  in developing a
reasonable estimate of fair value.

A. Business Combinations

The Group measures the value of the acquired assets, liabilities, and contingent liabilities considering the fair value basis from the date on which the Group took control. The criteria considered to
measure the fair value of the main items were the following:

·

·

Fixed assets were valued considering the market value provided by an appraiser;

Intangibles consider the valuation of Concessions;

· Deferred taxes were valued based on the temporary differences between the accounting and tax basis of the business combination;

· Non-controlling interests were measured as a proportional basis of the net assets identified on the acquisition date

·

·

Intangibles consider the valuation of its Power Purchase Agreements (PPAs); and,

Contingent liabilities were determined over the average probability established by third party legal processes.

B. Cash Generating Unit for impairment testing

See Note 14.C.

C. Derivatives

See Note 31 regarding “Financial Instruments”.

D. Non-derivative financial liabilities

Non-derivative  financial  liabilities  are  measured  at  their  respective  fair  values,  at  initial  recognition  and  for  disclosure  purposes,  at  each  reporting  date.  Fair  value  for  disclosure  purposes,  is
determined based on the quoted trading price in the market for traded debentures, whereas for non-traded loans, debentures and other financial liabilities is determined by discounting the future
cash flows in respect of the principal and interest component using the market interest rate as at the date of the report.

F - 41

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 5 – Cash and Cash Equivalents

Cash in banks
Time deposits (a)
Cash and cash equivalents for purposes of the statement of cash flows

As at December 31

2016

2015

$ thousands

320,199 
6,436 
326,635 

277,442 
106,511 
383,953 

(a)

Time deposits corresponds to short-term  investments made for periods ranging from one day to three months, depending on immediate  cash requirements  of the Group, and earn interest at
short-term deposit rates in US Dollars and other currencies ranging from 0.01% to 4.00% per annum.

The Group’s exposure to credit risk, interest rate risk and currency risk and a sensitivity analysis with respect to the financial assets and liabilities is detailed in Note 31 “Financial Instruments”.

Note 6 – Short-Term investments and deposits

Short-term bank deposits (a)
Restricted Cash (b)

Other

As at December 31

2016

2015

$ thousands 

— 
89,475 

89,475 
70 
89,545 

50,000 
251,955 

301,955 
6,747 
308,702 

(a) As at December 31, 2015, corresponds to 180-day time deposits set by Inkia Americas Holdings Ltd from the proceeds of the Inkia Holdings Limited (“Acter sale”).

(b) Corresponds to amounts held in escrow accounts as collateral for loans and contractual obligations, such as debt service reserve accounts and time deposits that guarantee letters of credit. They
earn interest at market interest rates of 0.01% to 6.2%. As at December 31, 2015, it included mainly $117 million in I.C. Power Distribution Holdings Pte. Ltd.  for the acquisition of Energuate
and $50 million of distributions received by I.C. Power Israel Ltd. (“ICPI”) for the payment of mezzanine Loan-Tranch A made in January 2016..

Note 7 – Trade Receivables, Net

Trade Receivables
Less – allowance for doubtful debts

As at December 31

2016

2015

$ thousands

285,100 

(568)  

284,532 

123,377 
(104)
123,273 

F - 42

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 8 – Other Current Assets

Government agencies (a)
Insurance claims (b)
Advances to suppliers
Transmission line sale (c)
Transaction costs Energuate
Derivative instruments
Selective consumption tax on heavy fuel oil (d)
Prepaid expenses
Other receivables

As at December 31

2016

2015

$ thousands

14,677 
8,809 
141 
4,200 
1,903 
1,831 
940 
6,039 
11,233 
49,773 

23,267 
3,944 
306 
— 
— 
— 
— 
9,489 
8,254 
45,260 

(a) The balance corresponds mainly to the VAT incurred in the construction of CDA and Samay I (“Puerto Bravo”) projects. Both projects have the tax benefit of recovering the VAT incurred during

the construction stage on a regular basis.

(b) As of December 31, 2016, it corresponds to the accounts receivables recorded in Samay I and Corinto in relation to its insurance claims for property damage and business interruption by $8 million
and $750 thousand, respectively. As of December 31, 2015, it corresponds to the accounts receivables recorded in Amayo II and Cobee related to its insurance claims for Business Interruption and
for property damage by $2 million and $2 million, respectively.

(c) As of December 31, 2016, it corresponds to the sale of the transmission line of a Corinto and Amayo I to Empresa Nacional de Transmision Electrica (“ENATREL”).

(d) During  2016,  the  Dominican  Republic  Government,  enacted  the  Decree  No.  275-16  which  establishes  a  system  of  reimbursement  of  Selective  Consumption  Tax  on  fossil  fuels  and  petroleum

products to individual or legal entities, including generation companies. The Decree sets out a payment in advance for fuels purchased which will be reimbursed as they are consumed.

Note 9 – Inventories

Fuel (a)
Spare parts (b)

As at December 31

2016

2015

$ thousands

42,105 
49,554 
91,659 

5,786 
44,565 
50,351 

(a) The plants in El Salvador, Nicaragua, Guatemala, Jamaica and Dominican Republic consume heavy fuel, and the plants in Chile and Samay I in Peru consume diesel for the generation of electric

energy. These plants must purchase fuel in the international market and import it into the respective countries. As of December 31.2016, $30 million corresponds to Samay I’s diesel inventory.
According to its Concession agreement, Samay I must keep the equivalent of 15 days of fuel autonomy as cold reserve. The plants must take into consideration demand for the electric energy,
available supply and transportation cost and timing when purchasing fuel.

(b) Corresponds to spare parts held in storage to be used in maintenance work.

During 2016, the Group recognized inventory write downs of $135 thousand charged to cost of sales to present its fuel inventories at net realizable value ($623 thousand during 2015).

F - 43

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies

A.

Condensed information regarding significant associated companies

1.

Condensed financial information with respect to the statement of financial position

Principal place of business
Proportion of ownership interest

Current assets
Non-current assets
Current liabilities
Non-current liabilities
Non-controlling interests
Total net assets attributable to the Group

Share of Group in net assets
Adjustments:
   Excess cost
   Loans
Financial guarantee
Book value of investment

ZIM

Qoros*

As at December 31

2016

2015

2016

2015

$ thousands

International

China

32%

32%

50%

50%

465,892 
1,237,740 
(530,842)
(1,273,447)
(3,125)
(103,782)

(33,210)

114,953 
— 
— 
81,743 

616,279 
1,296,035 
(610,933)  
(1,222,639)  
(3,976)  
74,766 

23,925 

177,360 
— 
— 
201,285 

259,804 
1,273,862 
(773,946)  
(695,484)  

— 
64,236 

32,118 

— 
55,798 
29,677 
117,593 

235,084 
1,430,156 
(888,354)
(746,740)
— 
30,146 

15,073 

— 
109,393 
34,263 
158,729 

* Qoros is a joint venture (See Note 10.C.b). The current assets include cash and cash equivalent of $67 million (2015: $40 million). The current and non-current liabilities excluding trade and

other payables and provisions amount to $1.1 billion (2015: $1.2 billion).

F - 44

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

2.

Condensed financial information with respect to results of operations

ZIM 

2015

2016

Tower*

Qoros***

  Generandes**  

2014

2015

For the year ended December 31
2014
$ thousands         

2016

2015

2014

2014

Revenues

2,539,296 

2,991,135 

1,667,107 

461,778 

828,008 

377,456 

232,114 

138,260 

193,000 

(168,290)  

2,253 

(72,515)  

(737)  

24,723 

(285,069)  

(392,427)   

(349,612)   

29,628 

(12,351)  

(1,948)  

2,399 

— 

(8,287)  

7 

(19)  

(25)  

— 

(180,641)  

305 

(70,116)  

(737)  

16,436 

(285,062)  

(392,446)  

(349,637)   

29,628 

(Loss) / income
****

Other
comprehensive
(loss) / income
****

Total
comprehensive
(loss) / income

Kenon’s share of
comprehensive
(loss) / income

(57,805)  

98 

(22,437)  

Adjustments

9,856 

9,418 

9,665 

(189)  

(609)  

4,696 

(142,531)  

(196,223)   

(174,818)   

11,554 

13,687 

(3)  

— 

12 

(12)

Kenon’s share of
comprehensive
(Loss) / Income
presented in the
books

(47,949)  

9,516 

(12,772)  

(798)  

18,383 

(142,534)  

(196,223)  

(174,806)   

11,542 

*
**
***

****

Distributed as dividend-in-kind in July 2015 (see Note 10.C.c). Results of operations for 2015 corresponds to the six months ended June 30, 2015.
Sold in 2014.
Qoros is a joint venture (See Note 10.C.b). The depreciation and amortization, interest income, interest expense and income tax expenses recorded by Qoros during the year were $119 million,
$2 million, $63 million and $37 thousand (2015: $75 million, $2 million, $2 million and $92 thousand; 2014: $32 million, $3 million, $35 million and $86 thousand) respectively.
Excludes portion attributable to non-controlling interest.

F - 45

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
Note 10 – Investment in Associated Companies (Cont’d)

         B.     Associated companies that are individually immaterial

Book value of investments as at December 31

8,897 

9,008 

2016

Associated Companies
As at December 31
2015
$ thousands

2014

Share of Group in income
Share of Group in other comprehensive (loss)/income

Share of Group in total comprehensive (loss)/income

C. Additional information

a. ZIM

939 
- 

939 

123 
- 

123 

8,334 
(10,398)

(2,064)

1. Upon completion of the debt arrangement in ZIM, on July 16, 2014, the Group declined to a rate of holdings of 32% of ZIM’s equity and as a result it ceased to control ZIM. Commencing
from this date, IC presents its investment in ZIM as an associated company. ZIM’s results up to the completion date of the debt arrangement, together with the income due to loss of control and
the loss due to waiving all ZIM’s debts, were presented separately in the consolidated profit and loss statements in the category “profit for the year from discontinued operations”.

ZIM’s debt restructuring, which was completed on July 16, 2014 (“the effective date of the restructuring”), involved representatives of the majority of ZIM’s financial creditors, related parties
and  additional  stakeholders.  As  a  result  of  the  restructuring,  among  other  things,  ZIM’s  outstanding  indebtedness  and  liabilities  (face  value,  including  future  commitments  in  respect  of
operating leases, and with regard to those parties participating in the restructuring) were reduced from approximately $3.4 billion to approximately $2 billion.

Upon completion of the debt arrangement in ZIM, on July 16, 2014, IC ceased to control ZIM and, therefore, in the third quarter of 2014, IC recorded income in the amount of $796 million as
a result of loss of control of ZIM and presentation of its investment in ZIM as an associated company based on its fair value as derived from the amount of IC’s investment in ZIM’s equity in
accordance with the arrangement, and also recorded a loss of $187 million due to IC’s waiver of all of ZIM’s debts, as noted above. The resulting amount of the income created, in the amount
of $609 million, as stated, was presented in the statement of profit and loss in the category “profit for the year from discontinued operations”.

As part of the debt arrangement, IC invested $200 million in the shareholders’ equity of ZIM. Based on a PPA (purchase price allocation) study made by an external appraiser, the excess cost
was allocated, primarily, as follows: negative excess cost to ships, in the amount of $104 million, negative excess cost in respect of unfavorable operating lease contracts, in the amount of $39
million, positive excess cost in respect of containers and equipment, in the amount of $30 million, positive excess cost in respect of a brand name, in the amount of $80 million, and goodwill,
in the amount of $219 million.

2. The container shipping industry is dynamic and volatile and has been marked in recent years by instability as a result of a prolonged global economic crisis, continued deterioration of market
environment  which  is  characterized  by slower  growth  of  demand  and  worsening  overcapacity  combined  with  increased  uncertainty  due  to  the  realigning  of  global  alliances.  This  situation
combined with carriers' ambitions to increase and protect their market share led freight rates to fall sharply in most of the trades, mainly since the second half of 2015. The first half of 2016
continued to be very challenging. Container freight rates hit historical lows across major trades, as new vessel capacity was added, while market demand remained weak. During the second
half of 2016, freight rates have increased in certain trades, following a filing for court receivership by one of the top ten companies in the industry.

With the continuous deterioration in the shipping business environment and volatile bunker prices, ZIM's management continues to improve its operational results and liquidity position by
optimizing ZIM's network rationalizations including establishment of new partnerships, invest in upgrading customer services and constantly strive to create and maintain efficiencies and cost
reductions.

F - 46

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

However,  continuation  of  this  trend  could  negatively  affect  the  entire  industry  and  also  affect  the  ZIM's  business,  financial  position,  assets  value,  results  of  operations,  cash  flows  and
compliance with certain financial covenants.

As of December 31, 2016, ZIM had a net deficit of $101 million (compared to net equity of $79 million as of December 31, 2015) and it had negative working capital of $65 million (compared
to positive working capital of $5 million as of December 31, 2015).

During the year ended December 31, 2016, ZIM incurred an operating loss of $52 million (compared to operating profit of $98 million during the year ended December 31, 2015 and operating
loss of $263 million during the year ended December 31, 2014) and net loss of $164 million (compared to net profit of $7 million during the year ended December 31, 2015 and net loss of $198
million during the year ended December 31, 2014).

As  at  December  31,  2016,  ZIM  complies  with  its  amended  financial  covenants,  ZIM’s  liquidity  amounts  to  $182  million  (Minimum  Liquidity  required  is  $125  million)  -  see  also  Note
10.C.a.2(ii).

In order to improve its financial position and liquidity, ZIM took the following steps:

(i) ZIM approached some of its creditors and lessors of vessels and equipment, for the purpose of rescheduling payments.

Below are the main components of the agreements reached:

a. Deferral of payments in a total amount of approximately $116 million (the "Deferred Amounts"), during a period of up to 12 months starting on September 30, 2016. The repayment of the
Deferred Amounts will begin as from January 1, 2018 on a straight line basis and will end on December 31, 2020 (the "Repayment Period"). In case any of the respective agreement expires
before the end of the Repayment Period, the unpaid balance of Deferred Amounts will be paid in full upon expiration.

b. The Deferred Amounts bear interest, at an annual rate of LIBOR + 2.8% paid quarterly in cash.

c. ZIM granted security over its rights and interests derived from certain of its receivables, for securing the repayment of the Deferred Amounts. The balance of the secured Deferred Amounts as

of December 31, 2016 amounted to $41 million.

d. With respect to excess cash, as defined in the rescheduling agreement, a mechanism of mandatory prepayments of the abovementioned rescheduled amounts and their related accrued interest,

will apply.

The binding approvals of these agreements were obtained and the modified terms of these agreements were applied in ZIM's financial statements in the fourth quarter. In this respect, certain
agreements of containers leases previously classified as operational leases were reclassified as financial leases, resulting in recognition of additional assets and liabilities in a total amount of $73
million.

(ii) ZIM obtained amendments to its financial covenants. Accordingly, below are the current financial covenants of ZIM:

1) Fixed Charge Cover ratio - The required ratio will be assessed on March 31, 2018 onwards, and will gradually increase from 0.78:1 as required on March 31, 2018 to 0.99:1 as required on

March 31, 2019 and remain at that level thereafter.

2) Total  Leverage  ratio  -  The  required  ratio  will  be  assessed  on  March  31,  2018  onwards,  and  will  gradually  decrease  from  23.69:1  as  required  on  March  31,  2018  to  6.64:1  as  required  on

December 31, 2018 and remain at that level thereafter.

3) Minimum Liquidity – This covenant was amended as from March 31, 2016 to include all cash and cash equivalents available to ZIM without any restrictions.  In addition, during 2016 and
through (and including) September 30, 2016, ZIM was required to stand a minimum liquidity of $150 million. At December 31, 2016 ZIM is in compliance with its financial covenants with
liquidity amounting to $182 million (Minimum Liquidity required is $125 million).

F - 47

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

ZIM's  financial  position,  liquidity  and  the  risk  of  deviation  from  financial  covenants  depend  on  the  recovery  of  the  shipping  industry  and  especially  the  freight  rates.  Current  economic
conditions make forecasting difficult, and there is possibility that actual performance may be materially different from ZIM's management plans and expectations.

In the opinion of ZIM's management  and its Board of Directors,  the updated  forecast  and the abovementioned  actions  with regards to rescheduling  of payments  and covenants  amendment,
enables ZIM to meet its liabilities and operational needs and to comply with the new set of financial covenants for a period of at least 12 months following the balance sheet date.

3. The recent trends in the shipping industry, in particular the uncertainty of global markets due to continued conflicts in Middle East, continued decline in trade volumes and freight rates, vessel
capacity oversupply, rebalancing of the Chinese economy away from manufacturing and exports towards domestic consumption, and the Panama Canal expansion have an adverse effect on
ZIM’s results.

As of June 30, 2016, ZIM tested its assets for impairment based on IAS 36, where ZIM operates an integrated liner network, as one cash-generating unit (“CGU”). ZIM estimated its recoverable
amount on the basis of fair value less costs to sell, using the discounted cash flow (“DCF”) method, measured at Level 3 fair value measurement under IFRS 13. The impairment test resulted
with  a  recoverable  amount  exceeding  the  carrying  amount  of  the  CGU  with  a  range  between  $291  million  and  $330  million,  and  therefore  no  impairment  was  recognized.  Although  ZIM
believes the assumptions used for impairment are reasonable and acceptable, no assurance can be made against the level of bunker prices and freight rates sustainability.

Kenon, independently and separately from ZIM, appointed a third-party to perform a valuation of its 32% equity investment in ZIM in accordance with IAS 28 Investments in Associates and
IAS  36  Impairment  of  Assets  .  On  October  3,  2016  Kenon  concluded  that  as  of  June  30,  2016,  the  carrying  amount  of  the  investment  in  ZIM  is  higher  than  the  recoverable  amount,  and
therefore, Kenon recognized impairment losses of $72 million in its financial statements in respect of its investment in ZIM .

The impairment losses recognized by Kenon was mainly in relation to goodwill and other fair value adjustments recognized by Kenon as part of its investment in ZIM.

For the purposes of management’s impairment evaluation of the Group’s investment, ZIM, which operates integrated network liner activity, has one CGU, which consists of all of ZIM’s assets.
The recoverable amount is based on the higher of the value in use and the fair value less cost of disposal (“FVLCOD”). The valuation is predominantly based on publicly available information
and earnings of ZIM over the 12-month periods to both March and June 2016. The valuation approach was based on the equity method, recognizing the cost of investment and share of losses in
ZIM, and subsequently to assess a maintainable level of earnings to form a view on the appropriate valuation range as at June 30, 2016.

During the recent valuation, due to the uncertainty experienced in shipping sector, and a limited evidence of a sustained industry recovery as at June 30, 2016, the following data points and
benchmarks were considered by the independent valuer:

A. The implied EV/EBITDA range based on the indicative range of fair values for Kenon’s 32% stake in ZIM and the actual EBITDA for the 12-month to March 31, 2016 and the 12-month to

June 30, 2016; and,

B. The implied EV/EBITDA range based on the indicative range of fair values for Kenon’s 32% stake in ZIM and the estimated sustainable EBITDA computed based on a 5% margin and

actual revenue for the 12-month to March 31, 2016. The estimated maintainable margin was based on a 30% discount applied to analyst estimate of the industry margin.

The independent valuer arrived at a range of equity valued between $60 - $120 million after adjustments for Net Debt. The fair value measurement was categorized as Level 3 fair value
based on the inputs in the valuation technique used.

Based on the valuation range abovementioned, Kenon adopted the mid-point value of $90 million to appropriately reflect the relevant carrying value of Kenon’s investment in ZIM as at
June 30, 2016.

4. In 2015, ZIM recognized an impairment of the vessels held for sale in an amount of $7 million as impairment under other operating expenses.

5. As part of the July 2014 group debt restructuring, ZIM undertook to scrap eight vessels during the period of 16 months from the effective date of the restructuring. In 2015, ZIM disposed two
vessels,  and  obtained  an  extension  through  December  16,  2015,  to  dispose  the  last  vessel.  As  of  December  31,  2015  all  of  such  vessels  were  disposed.  Upon  the  effective  date  of  the
restructuring, those vessels were classified as held for sale in ZIM’s report and as a result, an impairment loss in an amount of $110 million was recorded under other operating expenses in
ZIM’s report (as included in the Day 1 Effect).

F - 48

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

6. During 2015, ZIM sold all of its holdings in an associated company which resulted in a disposal gain of $32 million recognized in ZIM’s financial statements. Kenon's share of the disposal gain

is $10 million and is recognized in share of net income and losses from associated companies.

7. During 2016, ZIM sold a portion of its holdings in an associated company and ceased to have significant influence over such investee. ZIM recognized a disposal gain in an amount of $16

million, Kenon's share of the disposal gain is $5 million and is recognized in share of net income and losses from associated companies.

b. Qoros Automotive Co. Ltd. (“Qoros”)

1. As at December  31, 2016, the Group holds, through a wholly-owned and controlled  company, Quantum (2007) LLC (“Quantum”)  the equity interest  of Qoros in a 50/50 agreement  with a
Chinese vehicle manufacturer – Chery Automobiles Limited (“Chery”), which is engaged in manufacture of vehicles using advanced technology, and marketing and distribution of the vehicles
worldwide under a quality brand name.

2. As at December 31, 2016, Kenon’s investment in Qoros amounts to $117 million (December 31, 2015 – $159 million).

3. In January and February 2016, Kenon and Wuhu Chery each, through Quantum, a Kenon subsidiary, provided a RMB275 million ($42 million) convertible loan to Qoros to support its working

capital requirements.

During 2015, Kenon and Chery each, through a subsidiary, provided a RMB800 million ($130 million) convertible loan to Qoros to support its ongoing development.

4. Qoros incurred a net loss of RMB 1.9 billion (approximately $284 million) and had net current liabilities of approximately RMB 3.57 billion (approximately $515 million) for the year ended

December 31, 2016 (RMB 2.48 billion (approximately $372 million) and RMB 4.24 billion (approximately $610 million) as of December 31, 2015 respectively).

Qoros had given careful consideration to the future of liquidity of Qoros and its available sources of finance in assessing whether Qoros will have sufficient financial resources to continue as a
going concern, with unused bank loan facilities of RMB 205 million (approximately $29 million) as at 31 December 2016, with plans to refinance most of its short-term loans in 2017.

5. Ansonia Loans

a. Overview

On April 22 and September 2, 2016, Ansonia Holdings Singapore B.V. ("Ansonia"), which owns approximately 58% of the outstanding shares of Kenon, entered an agreement to provide loans
(“Ansonia loans”) in an aggregate amount of up to RMB 450 million ($72 million) with an interest rate of 6% per annum, subjected to late payment penalty interest calculated by increasing the
prevailing loan interest rate to 120%, through Quantum, to support Qoros. Wuhu Chery completed its provision of loans to Qoros in the same amount and on similar conditions.  Set forth below
is an overview of the Ansonia loans as of December 31, 2016:

 Date Granted

Tranche 1 / Apr 2016
Tranche 2 / Apr 2016
Tranche 3 / Sep 2016

Total

RMB million

Plus certain interest

Convertible into Equity 
Discount Rate 1

Loan Transfer Date from 
Quantum to Qoros 2

150
150
150
450 
($72 million)

6%

10%

25%

May 20, 2016
June 28, 2016
September 6, 2016

1.  To facilitate potential investment by a third party in Qoros, Ansonia loans are automatically convertible into equity in Quantum in the event of a third-party financing at Qoros meets certain
conditions, or when Ansonia loans are repaid in relation to such third-party financing. The loans will be convertible into equity of Quantum at a 10% (Tranche 1 and 2) and at a 25% discount
(Tranche 3) discount to the implied value of Qoros based upon the third-party financing.

2. Loans carry the same term of 9 months from the first transfer date

As of December  31, 2016, Kenon engaged a third party  to perform  the fair  value of the Ansonia loans that amounted to RMB 450 million  (approximately  $72 million)  and were valued at
approximately RMB 303 million ($45 million; loan $16 million and equity derivative $29 million). The accounting for Ansonia loans at fair value gain are measured in accordance with IAS 39
(See Consolidated Statement of Changes in Equity For the years ended December 31, 2016 and 2015).

F - 49

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

b. Repayment of the Ansonia loans

i.

ii.

iii.
iv.

Ansonia loans to Quantum are non-recourse to Kenon, and limited recourse to Quantum. Quantum’s obligations to repay these loans when Quantum receives loan repayments from
Qoros; or Quantum sells all or portion of its interest in Qoros.
Qoros has agreed to secure and undertaken to enter into the pledge for the Quantum and Wuhu Chery loans with certain collateral. The pledge is subjected to approvals to be received.
Qoros' pledge of this collateral will be released upon a conversion of the shareholder loans into equity (as described below) or upon repayment.
Quantum agreed to assign its rights, title and interests in the collateral securing these loans to Ansonia.
Ansonia loans can be repaid by Quantum without penalty or premium prior to the conversion into Equity of Quantum.

c. Conversion of the Ansonia loans into Equity (“Conversion”)

Upon the conversion, Kenon's indirect interest in Qoros will be diluted. From the point of the conversion until the third anniversary of such conversion, Ansonia will have the option to convert
its equity in Quantum into an equivalent value of equity in Qoros, subject to regulatory acceptance, Qoros', Chery's and Wuhu Chery's approvals.

In view of Qoros' financing needs, Kenon believes that the amendment of the Loan Agreement to facilitate the Third Tranche, is in the best interests of Kenon and its shareholders. As Ansonia
is a major shareholder in Kenon, this transaction has been reviewed and approved by Kenon in accordance with its related party transaction policy.

6. Financial Guarantees Provisions in 2016

On June 30, 2016, Kenon increased its previously recognized provision of $30 million to $160 million in respect to Kenon’s “back-to-back” guarantee obligations to Chery (RMB1,100 million),
in respect of guarantees that Chery has given for Qoros’ bank debt and has pledged a portion of its interests in Qoros to secure Qoros’ bank debt. In addition to the current liquidity needs of
Qoros, its financial position and Kenon’s strategic intent, the provision was made due to uncertainty in the Chinese automobile market. As a result, Kenon recognized a $130 million charge to
expense for such financial guarantees in its consolidated statement of profit or loss in 2016.

These back-to-back guarantees consist of (i) a back-to-back guarantee of one-half of the principal amount of Chery’s guarantee of RMB1.5 billion with respect to Qoros’ RMB3 billion facility,
and (ii) a back-to-back guarantee of one-half of the principal amount of Chery’s guarantee of Qoros’ RMB700 million facility, and interest and fees, if applicable.

7. Financial Guarantees Release from 2016

On December 25, 2016. Kenon has agreed to provide a RMB250 million (approximately $36 million) shareholder loan to Qoros, and in relation to this loan, the maximum amount of Kenon’s
back-to-back guarantee obligations to Chery has been reduced by RMB250 million as follows. As part of the loan to Qoros, Kenon’s back-to-back guarantee obligations to Chery with respect to
Chery’s  guarantee  of  Qoros’  RMB3  billion  loan  facility  with  the  Export-Import  Bank  of  China  (“EXIM  Bank”)  have  been  reduced  by  one  third,  and  the  maximum  amount  of  Kenon’s
obligations  under  this  back-to-back  guarantee  (subject  to  certain  obligations  to  negotiate  fees  and  interest  described  in  the  table  below)  has  been  reduced  from  RMB750  million  to
RMB500 million (approximately $72 million). In addition, Ansonia has committed to fund RMB25 million (approximately $4 million) of Kenon’s remaining back-to-back guarantee obligations
to Chery in certain circumstances (“Ansonia Commitment”).

As at December 31, 2016, Kenon’s back-to-back guarantee obligations to Chery is RMB 850 million including any interest and charges (approximately $119 million).

Chery has agreed to make a corresponding RMB250 million loan to Qoros. The proceeds of these loans will be used to support Qoros’ ordinary course working capital requirements and Qoros’
investments in new initiatives, such as new-energy vehicles, while it continues its fund raising efforts.

As part of this transaction, Quantum has pledged approximately 9% of the outstanding shares of Qoros to Chery to secure the amount of the back-to-back guarantee reduction. Chery may also
borrow from Quantum up to 5% of Qoros’ outstanding shares to meet its pledge obligations under a Qoros RMB 1.2 billion loan facility with EXIM Bank. The number of Qoros shares pledged
to Chery is subject to adjustment from time to time. In certain circumstances Quantum must pledge additional shares (to the extent it has unencumbered shares), and in other circumstances the
pledged shares may be released and the borrowed shares must be returned, e.g., in the event that Quantum is required to pledge additional shares to secure the RMB1.2 billion EXIM Bank
facility (Quantum has previously pledged a significant portion of its Qoros shares to secure Qoros’ obligations under Qoros’ RMB 1.2 billion loan facility with EXIM Bank).

Kenon has been informed that, in order to facilitate Kenon’s above mentioned reduction in Kenon’s back-to-back guarantee obligations to Chery, an affiliate of Kenon’s major shareholder has
given certain undertakings to Chery with respect to the released guarantee obligations.

F - 50

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

a. Set forth below is an overview of the guarantees provided by Kenon in respect of Qoros' debt as of December 31, 2016:

Date Granted

Qoros Credit Facility 
(EXIM Bank loan facility)

Kenon Maximum Guarantee
Obligation prior to Guarantee
Release described above

Kenon Maximum Guarantee Obligation after Guarantee Release

Spin-Off / November 2015

May / November 2015

Total 4

3,000

700

RMB million

750

350 3

1,100 
($160 million) 1,2

475
($69 million) 1,2
350
($51 million) 3
825
($120 million) 1,2

Plus certain interest and fees
-

60 3

60
($9 million) 3

1.  

2.

3.  

In the event that Chery’s liability under its guarantee exceeds RMB1.5 billion, Kenon has committed to negotiate with Chery in good faith to find a solution so that Kenon’s and Chery’s
liabilities for the indebtedness of Qoros under this credit facility are equal in proportion. This is subject to the reduction of Kenon’s back-to-back guarantee obligations by one-third as
described above.
Following  the  reduction  in  back-to-back  guarantee  obligations  of  Kenon  as  described  above,  Kenon’s  maximum  guarantee  obligations  (subject  to  certain  obligations  to  negotiate  fees  and
interest.)  in  respect  of  Qoros’  RMB3  billion  facility  have  been  reduced  to  RMB500  million.  Pursuant  to  the  Ansonia  Commitment  described  above,  Ansonia  has  agreed  to  pay  up  to
RMB25 million (approximately $4 million) to Kenon in certain circumstances in the event that Kenon is required to make payments on its back-to-back guarantees under the RMB3 billion
facility; any payment by Ansonia would be made only after all obligations under Kenon’s back-to-back guarantees in excess of the amount of the Ansonia Commitment have been satisfied.
Giving effect to the Ansonia Commitment, Kenon’s effective maximum guarantee obligations are RMB475 million.
In the event that Chery is obligated under its guarantee of the EXIM Bank loan facility to make payments that exceed Kenon’s obligations under the guarantee, Kenon and Chery have agreed
to try to find an acceptable solution, but without any obligation on Kenon to be liable for more than the amounts set forth in the table above.

4. Table does not include pledges. Quantum has pledged a significant portion of its Qoros shares to EXIM Bank to secure Qoros’ obligations under the RMB1.2 billion EXIM Bank facility.

Quantum has also pledged Qoros shares to Chery as described above. (For further information, See Note 10.C.b.8)

8. Financial Guarantees Release from 2017

On March 10, 2017, Kenon announces that it has agreed to fund up to RMB777 million (approximately $114 million) to Qoros in relation to the full release of its remaining RMB825 million
(approximately $125 million) back-to-back guarantee obligations to Chery in two tranches, which releases Kenon from commitments to pay any related interest and fees to Chery under the
guarantees.

On March  10,  2017, Kenon transferred  RMB388.5  million  (approximately  $57 million)  ("First  Tranche  Loans")  to  Qoros in  relation  to  a  reduction  of  RMB425  million  (approximately  $63
million) of Kenon's back-to-back guarantee obligations to Chery, including related interest and fees and the provision of the Second Tranche Loans shall be at Kenon's discretion.

As part of the First Tranche Loans, in relation to 50% reduction of the guarantee, Kenon funded 50% for Kenon and 50% on behalf of Chery. Kenon will also pledge Qoros shares to Chery (as
discussed below) in relation to the remaining 50% of the guarantee reduction.

Kenon agreed to provide an additional RMB388.5 million to Qoros (the "Second Tranche Loans") on similar terms (subject to the signing of additional agreements and certain other conditions)
in relation to a further RMB425 million reduction in its back-to-back guarantees, which will release Kenon completely from all of its back-to-back guarantee obligations to Chery.

In the event that Chery's obligations under its guarantees are reduced, through amortization of the loans or guarantee releases, Kenon is entitled to the proportionate return from Chery of the
loans  provided  on Chery's  behalf  (i.e.,  up to RMB388.5 million  (approximately  $57 million)  with  respect  to  the  First  Tranche  Loans  and  the Second  Tranche  Loans)  and  the  release  of  the
pledges described above.

Quantum will pledge approximately 10.3% of the outstanding shares of Qoros to Chery in relation to 50% of the guarantee releases, which pledges are enforceable to the extent Kenon would
have been required to make payments under such guarantees but for the guarantee releases.

F - 51

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

In addition, Chery may also borrow from Quantum 5% of Qoros' outstanding shares in relation to Kenon's provision of the First Tranche Loans and the Second Tranche Loans. The number of
Qoros shares pledged to Chery which are borrowed from Quantum is subject to adjustment from time to time.

Set forth below is an overview of the RMB850 million back-to-back guarantees provided by Kenon in respect of Qoros' indebtedness, reflecting the reduction of the back-to-back guarantees
described above:

Loans

Timing

Amount of Loans to
Qoros

Amount of Guarantee
Obligations Prior to
Investment

First Tranche
Second Tranche
Total

March 2017
At Kenon's discretion

388.5
388.5
777

850 1
425
—

Release of Kenon
Guarantees to Chery

in RMB million

425 3
425 3
850 3

Remaining Guarantee
Obligations Post-
Investment

Pledge of Qoros Shares
in relation to Investment

425
—
—

5.17%
5.17%
10.3% 2

1. Kenon's major shareholder Ansonia Holdings Singapore B.V. has committed to fund RMB25 million (approximately $4 million) of Kenon's back-to-back guarantee obligations in certain
circumstances.
2. Excludes up to 5% of Qoros shares which Chery may borrow from Quantum to meet its pledge obligations under the Qoros RMB1.2 billion loan facility, as discussed above.
3. Plus interest and fees.

Following the pledges above, and taking account of prior pledges by Quantum of Qoros shares to Qoros' lenders and to Chery, substantially all of Kenon's interest in Qoros will be pledged, or
could be pledged pursuant to the equity borrowing arrangements with Chery described above.

The proceeds of the First Tranche Loans will be used to support Qoros' ordinary course working capital requirements, debt service requirements and investments in new initiatives, such as new-
energy vehicles, while Qoros continues its fund raising efforts. The transactions enable Kenon to support Qoros and its fundraising efforts, while reducing its back-to-back guarantee obligations
to Chery.

9. Background of Financial Guarantees

a.

In July 2012, Chery provided a guarantee to the banks, in the amount of RMB1.5 billion ($242 million), in relation to an agreement with the banks to provide Qoros a loan, in the amount of
RMB3  billion  ($482  million).  In  November  2015,  Kenon  has  provided  back-to-back  guarantees  to  Chery  of  RMB750  million  (approximately  $115  million)  in  respect  of  certain  of  Qoros’
indebtedness and has committed to negotiate with Chery in good faith to find a solution so that Kenon’s and Chery’s liabilities for the indebtedness of Qoros under Qoros’ RMB3 billion credit
facility are equal in proportion; Kenon has similarly agreed to try to find an acceptable solution in respect of Kenon’s and Chery’s liabilities for the indebtedness of Qoros under Qoros’ 1.5 RMB
billion facility, but without any obligation on Kenon to be liable for more than the amount set forth in its back-to-back guarantee to Chery. As a result, if Qoros is unable to meet its operating
expenses or is unable to comply with the terms of certain of its debt agreements, Kenon may be required to make payments under its guarantees to Chery. In a back-to-back arrangement Kenon
committed  to  Chery  to  pay  half  of  every  amount  it  will  be  required  to  pay  with  respect  to  the  above-mentioned  guarantee  (“the  2012  Guarantee").  The  fair  value  of  the  guarantee  has  been
recorded in the financial statements.

Prior to Kenon’s spin-off from IC, IC provided the 2012 Guarantee to Qoros. This guarantee by IC is a back-to-back guarantee of Chery’s guarantee of up to RMB1.5 billion (approximately
$240 million) under this credit facility, and the obligation of IC under this back-to-back guarantee is up to RMB888 million (approximately $142 million), including related interest and fees. In
relation to Kenon’s spin-off from IC, IC continued to provide this guarantee and Kenon entered into a$200 million credit facility with IC, and to the extent that IC is required to make payments
under its back-to-back guarantee in respect of Qoros’ credit facility, the amount of the loans owed by Kenon to IC under the credit facility will be increased accordingly.

On February 12, 2015, Kenon has agreed to provide a RMB400 million (approximately $64 million) loan to Qoros to support its ongoing development, and in relation to the provision of this
loan, IC’s back-to-back guarantee of Qoros’ debt was released in full. Chery’s guarantee under the Qoros facility of up to RMB1.5 billion (approximately $240 million) is not being released in
relation to the release of IC’s back-to-back guarantees and, as described above, in November 2015 Kenon has provided back-to-back guarantees to Chery of RMB750 million .

F - 52

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

b. On May 12, 2015, Qoros has signed a Consortium Loan Agreement with the Export-Import Bank of China, and China Construction Bank Co., LTD, Suzhou Branch, concerning the Project of
Research and Development of Hybrid Model (“Loan Agreement”), for an amount of RMB700 million ($108 million) or in USD not exceeding the equivalent to RMB480 million ($78 million)
(the “Facility”).

c. On June 15, 2015, this Facility was secured by Chery Automobile Co., Ltd (“Chery Guarantee Deed”) and pledged with Qoros’ 90 vehicle patents with an appraisal value of minimum RMB3.1
billion ($0.5 billion). The Loan Agreement’s term of 102 months bears a 5-years interest rate quoted by the People’s Bank of China in RMB at LIBOR+10%, or in USD at LIBOR+3.50% per
annum.

With relation to the above, Kenon provided a RMB350 million ($54 million) guarantee of this financing agreement to Chery for up to 50% of Chery’s Guarantee. As at December 31, 2016,
Qoros had drawn down the Facility of RMB700 million ($108 million) with an interest rate of 5.39% (RMB 700 million as at December 31, 2015). The fair value of the guarantee has been
recorded in the financial statements.

d. On  May  15,  2015,  Kenon  and  Chery  each  provided  a  RMB400  million  ($65  million)  loan  to  Qoros  to  support  its  ongoing  development.  RMB25  million  ($5  million)  of  each  loan  can  be
converted into equity on conditions set out in the agreement. As a result, Kenon’s ownership percentage in Qoros will not increase upon Qoros’ full, or partial, conversion of Kenon’s RMB400
million ($65 million) shareholder loan into equity.

Kenon expects all, or a portion, of the shareholder loans to convert into additional equity in Qoros upon the satisfaction of certain conditions, including the approval by the relevant Chinese
authority.

Kenon funded the RMB400 million ($65 million) shareholder loan through drawdowns of $65 million under a Credit Facility with its former parent, IC as disclosed in Note 1.B.

e. On July 31, 2014, in order to secure additional funding for Qoros of approximately RMB 1.2 billion ($200 million as of August 7, 2014) IC pledged a portion of its shares (including dividends
derived therefrom) in Qoros, in proportion to its share in Qoros’s capital, in favor of the Chinese bank providing Qoros with such financing. Simultaneously, the subsidiary of Chery that holds
Chery’s rights in Qoros also pledged a proportionate part of its rights in Qoros. Such financing agreement includes, inter alia, liabilities, provisions regarding covenants, events of immediate
payment and/or early payment for violations and/or events specified in the agreement. The lien agreement includes, inter alia, provisions concerning the ratio of securities and the pledging of
further securities in certain circumstances, including pledges of up to all of Quantum’s shares in Qoros (or cash), provisions regarding events that would entitle the Chinese Bank to exercise
the lien, certain representations and covenants, and provisions regarding the registration and approval of the lien.

As part of the reduction of guarantee obligations in Note 10.C.b.7, Kenon has pledged approximately 9% of the outstanding shares of Qoros to Chery to secure the amount of the back-to-back
guarantee reduction. Chery may also borrow from Kenon up to 5% of Qoros' outstanding shares to meet its pledge obligations under the abovementioned RMB 1.2 billion loan facility. As of
December 31, 2016, in relation to this loan facility of RMB 1.2 billion, Kenon and Chery have each pledged 22.6% of its equity interest in Qoros.

10. Business Plans

a.

In September 2014, Qoros’ board of directors reviewed a business development plan for the next ten years. Subsequently, Qoros’ board of directors approved a five-year business plan, which
reflected lower forecasted sales volumes and assumed the minimal level of capital expenditure necessary for such sales volumes. As a result, Qoros management performed impairment tests in
October 2015 and February 2016. In March 2017, Qoros’ board of directors approved a new business development plan for the next five years. As a result, Qoros management performed
impairment tests in March 2017 on Qoros’ operating assets as of December 31, 2016 and intangible assets.

Based on Qoros’ 2017 business plan, cash flow forecast, unutilised bank loan facilities and the plan to refinance the existing short term loans, Qoros’ is projected to generate sufficient cash
flows to meet its liabilities over the next twelve months from 31 December 2016. In preparing the cash flow forecast, Qoros considered the unused bank loan facilities of RMB 205 million
(approximately  $29  million),  the  roll  forward  of  its  short-term  loans  from  banks,  and  Qoros’  management  opinion  that  the  assumptions  which  are  included  in  the  cash  flow  forecast  are
reasonable.  Accordingly, the consolidated financial statements have been prepared on a going concern basis.  In the event where Qoros is unable to continue as a going concern, then this could
have a material  impact on Qoros’ ability  to realise their assets at their recognised values and to fulfill liabilities  in the normal course of business at the amounts stated in the consolidated
financial statements.

The recoverable amount of this CGU containing the intangible asset which is not available for use yet has been determined based on fair value less costs of disposal using discounted cash flow
projections.  These calculations were based on the cash flow projections from the 2017 business plan approved by management covering a five-year period ending 31 December 2021 and the
terminal value.  Cash flows beyond the five-year period are extrapolated using an estimated weighted average growth rate of 3% which is consistent with the forecasts included in independent
expert report.  The growth rates used do not exceed the long-term average growth rates for the business in which the CGU operates.

F - 53

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

Qoros concluded that the recoverable amount of its CGU was higher than the carrying value (adjusted for depreciation and amortization). The recoverable amount was determined based on fair
value  of  Qoros’  assets  less  the  costs  of  disposal  and  its  value  in  use,  using  discounted  cashflow  method.  Therefore,  no  impairment  was  recognized  in  Qoros’  December  31,  2016  financial
statements in respect of its CGU.

Although  Qoros  believes  the  assumptions  used  to  evaluate  the  potential  impairment  of  its  assets  are  reasonable  and  appropriate,  such  assumptions  are  highly  subjective.  There  can  be  no
assurance as to future levels of cars produced or sold by Qoros, the development of Qoros’ distribution and dealer network, and Qoros’ utilization of its facility.

The analysis for the impairment test is sensitive to variances in each of the assumptions used and if the assumptions used by Qoros to evaluate the potential impairment of its assets change,
Qoros may recognize significant impairment charges in its financial statements in the future. Qoros management has determined that the forecasted volume of sales and Qoros’ receipt of certain
subsidies from local Chinese governments are the most important elements of Qoros’ business plan and accordingly are the most sensitive key assumptions for which there reasonably could be a
possible change that could cause the carrying amount of Qoros’ CGU to exceed the recoverable amount.

The conclusion of its asset evaluation and future liquidity from available sources of finance through, renewal of borrowings, rollover financing, additional shareholder loans and steps to improve
its working capital, provides Qoros its  future financial resources.

c. Tower

1.

In March 2015, Tower accelerated the conversion of $80 million of its outstanding Series F Bonds into ordinary shares of Tower. As a result of the issuance of shares, Kenon's interest in Tower
was reduced from 29% to 23% of Tower’s equity and Kenon realized a dilution gain of $32 million.

2. On May 27, 2015, Kenon’s shareholders approved a capital reduction, contingent upon the approval of the High Court of the Republic of Singapore, to enable Kenon to distribute, on a pro rata
basis, some, or all, of the 18,030,041 ordinary shares of Tower held by Kenon, as well as 1,669,795 ordinary shares of Tower underlying the 1,669,795 Series 9 Warrants of Tower held by
Kenon, to holders of Kenon’s ordinary shares. On June 25, 2015, the High Court of the Republic of Singapore approved the reduction of Kenon’s issued share capital, enabling Kenon to declare
a distribution of some, or all, of its interest in Tower by distribution in specie. On June 30, 2015, the investment in Tower was reclassified to Assets held for distribution.

3. On July 7, 2015, Kenon’s board of directors declared a pro rata distribution (the “Distribution”) in specie of 18,030,041 ordinary shares of Tower (the “Tower Shares”) to Kenon’s shareholders
of  record  as  of  the  close  of  trading  on  July  20,  2015  (the  “Record  Date”).  The  Distribution  occurred  on  July  23,  2015  (the  “Distribution  Date”)  and  is  one  of  the  first  key  steps  in  the
implementation of Kenon’s strategy, which provided Kenon Shareholders with direct access to Tower, which Kenon believes is in the best interests of its shareholders.

4. The  Tower  Shares  to  be  distributed  in  the  Distribution  represent  all  of  the  shares  in  Tower  owned  by  Kenon,  excluding  the  1,669,795  shares  in  Tower  underlying  certain  warrants  held  by
Kenon. As of July 7, 2015, Kenon had 53,682,994 ordinary shares outstanding. Accordingly, each Kenon Shareholder as of the Record Date received approximately 0.335861 of a Tower Share
for every Kenon Share held by such shareholder as of the Record Date. The fair value of the distribution in kind amounts to $255 million. As a result of this distribution, the Group recognized a
gain from distribution of dividend in kind of $210 million. The gain arose from the difference between the fair value of the distribution and the carrying amount of the investment as required by
IFRIC 17 Distributions of non-cash assets to owners .

5. After the distribution, Kenon beneficially owned 1,669,795 Warrants representing approximately 2.0% of outstanding Ordinary Shares of Tower. On August 5, 2016, Kenon sold 1,699,795

Series 9 Warrants of Tower for proceeds of approximately $11.4 million.

F - 54

 
 
 
 
 
 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

d. Generandes Peru S.A

During the last quarter of 2013, Inkia announced its decision to sell its 39.01% direct equity in Generandes Peru S.A. (Holding of Edegel S.A.A.)

In April 2014, the board of directors of I.C. Power approved the sale of Generandes Peru S.A. I.C. Power recorded its investment in Generandes Peru S.A. as an associate, applying the equity
method until April 30, 2014.

On April 30, 2014, Inkia Americas Holdings Ltd. (the “Seller”) and I.C. Power Ltd as guarantor of the Seller, signed a share purchase agreement with Enersis SA (Enersis) for the sale of its
shares in Inkia Holdings (Acter) Limited that owns 21.14% indirect equity in Edegel S.A.A. for a sale price of $413 million. On September 3, 2014, Inkia Americas Holdings Ltd. completed the
sale of its shares in Inkia Holdings (Acter) Limited, that had directly the equivalent of 39.01% of Generandes Peru S. A.

As a result of this sale the Group recognized a gain on disposal of $132 million (net of tax $85 million). In addition, the Group recognized a gain in its combined statement of profit and loss
from the reclassification of foreign exchange of $25 million gain that was previously included in accumulated other comprehensive income.

F - 55

 
 
 
 
 
 
 
Note 10 – Investment in Associated Companies (Cont’d)

D.

Details regarding dividends received from associated companies

From associated companies

E.

Restrictions

Qoros

For the Year Ended December 31
2015

2016

2014

$ thousands

743 

4,487     

32,227 

Qoros has restrictions with respect to distribution of dividends and sale of assets deriving from legal and regulatory restrictions, restrictions under the joint venture agreement and the Articles
of Association and restrictions stemming from credit received.

ZIM

The holders of ordinary shares of ZIM are entitled to receive dividends when declared and are entitled to one vote per share at meetings of ZIM. All shares rank equally with regard to the
ZIM's residual assets, except as disclosed below.

In the framework of the process of privatizing ZIM, all the State of Israel’s holdings in ZIM (about 48.6%) were acquired by IC pursuant to an agreement from February 5, 2004. As part of
the process, ZIM allotted to the State of Israel a special State share so that it could protect the vital interests of the State.

On  July  14,  2014  the  State  and  ZIM  have  reached  a  settlement  agreement  (the  “Settlement  Agreement”)  that  has  been  validated  as  a  judgment  by  the  Supreme  Court.  The  Settlement
Agreement provides, inter alia, the following arrangement shall apply: State’s consent is required to any transfer of the shares in ZIM which confers on the holder a holding of 35% and more
of the ZIM’s share capital. In addition, any transfer of shares which confers on the holders a holding exceeding 24% but not exceeding 35%, shall require prior notice to the State. To the
extent the State determines that the transfer involves a potential damage to the State’s security or any of its vital interests or if the State did not receive the relevant information in order to
formulate a decision regarding the transfer, the State shall be entitled to inform, within 30 days, that it objects to the transfer, and it will be required to reason its objection. In such an event,
the transferor shall be entitled to approach a competent court on this matter.

The  Special  State  Share,  and  the  permit  which  accompanies  it,  also  imposes  transferability  restrictions  on  our  equity  interest  in  ZIM.  Furthermore,  although  there  are  no  contractual
restrictions on any sales of our shares by our controlling shareholders, if major shareholders’ ownership interest in Kenon (controlling shareholders of Kenon) is less than 36%, or major
shareholders cease to be the controlling shareholder, or sole controlling shareholder of Kenon, then Kenon’s rights with respect to its shares in ZIM (e.g., Kenon’s right to vote and receive
dividends in respect of its ZIM shares),will be limited to the rights applicable to an ownership of 24% of ZIM, until or unless the State of Israel provides its consent, or does not object to,
this decrease in major shareholders’ ownership or “control” (as defined in the State of Israel consent received by IC in relation to the spin-off). The State of Israel may also revoke Kenon’s
permit if there is a material change in the facts upon which the State of Israel’s consent was based, upon a breach of the provisions of the Special State Share by Kenon, Mr. Ofer, or ZIM, or
if the cancellation of the provisions of the Special State Share with respect to a person holding shares in ZIM contrary to the Special State Share’s provisions apply (without limitation).

The Special State Share is non-transferable. Except for the rights attached to the said share, it does not confer upon its holder voting rights or any share capital related rights.

F - 56

 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 11 – Subsidiaries

A.

Investments

1.

I.C. Power

a.

Subsidiaries acquired in 2016

On  December  29,  2015,  I.C.  Power  Distribution  Holdings  Pte  Ltd  (“ICP  Distribution”)  entered  into  an  agreement  with  Deorsa-Deocsa  Holdings  Ltd.  to  acquire  100%  of  the  shares  of
Estrella  Cooperatief  BA,  a  holding  company  that  indirectly  owned  two  distribution  companies  in  Guatemala  (90.6%  of  Distribuidora  de  Electricidad  de  Occidente  S.A.-DEOCSA  and
92.68% of Distribuidora de Electricidad de Oriente S.A.-DEORSA) and 100% of two smaller related businesses (Redes Electricas de Centroamerica S.A.-RECSA and Comercializadora
Guatemalteca Mayorista de Electricidad S.A.-GUATEMEL), collectively referred as “Energuate” for a purchase price equal to (i) the base purchase price, plus (ii) the deferred payment,
and (iii) the final adjustment amount.

On January 22, 2016, ICP Distribution acquired Estrella Cooperatief BA for a total consideration of $266 million which included a base price of $243 million paid at the closing date and a
deferred payment of $24 million which was paid on April 12, 2016. The consideration agreed is subject to working capital adjustments.

                        i.    Consideration transferred

The following table summarizes the acquisition-date fair value of each major class of consideration transferred:

Cash consideration paid
Deferred payment
Total cash consideration paid

Cash consideration paid
Cash and cash equivalents acquired
Net cash outflow used on acquisition

                        ii.    Identifiable assets acquired and liabilities assumed

The following table summarizes the fair value of the assets acquired and liabilities assumed at the date of acquisition:

Property, plant and equipment
Intangibles
Deferred income tax assets, net
Trade receivables, net
Cash and cash equivalents
Other assets
Loan from bank and others
Deferred income tax liabilities
Trade payables
Guarantee deposits from customers
Other liabilities
Fair value of total identifiable net assets acquired

F - 57

$ thousands

242,536 
23,750 
266,286 

$ thousands

266,286 
(60,227)
206,059 

Note

13.A
14.A

$ thousands

392,495 
195,148 
20,289 
100,508 
60,227 
22,457 
(288,290)
(54,642)
(108,193)
(51,072)
(39,418)
249,509 

 
 
 
 
 
   
 
 
   
 
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
   
  
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
 
 
 
   
   
   
 
 
 
Note 11 – Subsidiaries (Cont’d)

iii. Measurement of fair values

I.C. Power has measured the value of the acquired assets and liabilities at fair value on January 22, 2016, the date in which the Company gained control over Estrella Cooperatief BA.
Additional information regarding the fair value measurement of the main items acquired is as follows:

§
§
§
§

Fixed assets were valued considering the market value provided by an appraiser;
Intangibles consider the valuation of its Concessions;
Deferred taxes were valued based on the temporary differences between the accounting and tax basis of the business combination; and,
Non-controlling interests were measured as a proportional basis of the net assets identified on the acquisition date.

iv. Goodwill

Goodwill arising from the acquisition has been recognized as follows:

Total consideration transferred
Non-controlling interest
Fair value of identifiable net assets
Goodwill*

$ thousands

266,286 
20,325 
(249,509)
37,102 

* This amount is not deductible for tax purposes and was determined in Guatemalan Quetzals.

Goodwill is explained by the strategic interest of I.C. Power to expand its presence in distribution business. The goodwill is attributable mainly to the synergy from the acquisition of the
complimentary business in I.C. Power.

v. Recognition of revenues and profit or loss

During the period from the acquisition date to December 31, 2016, the revenues and profit or loss contributed by Estrella Cooperatief BA. to the consolidated results are $515 million and
$29 million respectively. If the acquisition had occurred on January 1, 2016, the Group’s management estimates that consolidated revenue would have been $551 million, and consolidated
profit for the period would be $30 million. In determining these amounts, it was assumed that the fair value adjustments, determined provisionally, that arose on the date of acquisition would
have been the same if the acquisition had occurred on January 1, 2016.

F - 58

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 11 – Subsidiaries (Cont’d)

b. Subsidiaries acquired in 2015

1. Advanced Integrated Energy Ltd.

On  June  8,  2015  I.C. Power  executed  an  agreement  with  Hadera  Paper  Ltd  (“Hadera  Paper”).,  pursuant  to  which  I.C.  Power agreed  to  acquire  from  Hadera  Paper  100%  of  the  shares  in
Advanced Integrated Energy Ltd. (“AIE”) and the Hadera Paper’s energy center. AIE holds a conditional license for the construction of a 120MW cogeneration power station in Israel. The
total payment amounted to NIS 60 million (approximately $15.7 million) which involved two transactions:

i. A business combination in the amount of NIS 36 million ($9 million) as follows: (i) On August 10, 2015, after fulfilling the conditions precedent contemplated in the aforementioned
agreement, I.C. Power completed the acquisition of AIE and paid NIS 1.8 million (approximately $460 thousand) to Hadera Paper Ltd. for the acquisition of the shares. (ii) I.C. Power
through AIE paid NIS 34 million (approximately $9 million) for the repayment of the loan between Hadera Paper Ltd. and its former shareholder.

The following table summarizes the fair values of the identifiable assets acquired and liabilities assumed at the date of acquisition:

Property, plant and equipment
Intangible
Deferred income tax liabilities
Total identifiable net assets acquired
Total consideration

Goodwill

  $ thousands  
8,981 
464 
( 123)
9,322 
( 9,441)
119 

ii. AEI acquired of Hadera Paper’s energy center in the aggregate amount of NIS 24 million (approximately $6 million). The Hadera Paper’s energy center generates electricity with a 18MW

steam turbine.

The amounts included in the Group’s 2015 consolidated financial statements for these acquisitions are immaterial. Also, no pro-forma financial information has been included as effects are
immaterial.

During 2016, AIE issued I.C. Power several capital notes of NIS 130 thousand (approximately $50 thousand), according to their terms, the notes bear no interest and are repayable subject to
the AIE’s sole discretion no earlier than five years after the issuance. Additional investments by I.C. Power will be required to enable AIE to complete construction of the power plant, which
is expected to commence operations in September 2019.

c. During 2014, I.C. Power acquired the following companies:

1. AEI Nicaragua Holdings Ltd., AEI Jamaica Holdings Ltd.

On  February  18,  2014,  I.C.Power  entered  into  an  agreement  with  AEI  Power  Ltd.  to  acquire  all  of  the  shares  of  AEI  Nicaragua  Holdings  Ltd.  and  AEI  Jamaica  Holdings  Ltd.  for  a
purchase price of $54 million. On March 12, 2014, Inkia took control of AEI Nicaragua Holdings and paid $37 million to AEI Power Ltd. in relation with the acquisition. As a result of
the post-closing purchase price adjustments, AEI Power Ltd. refunded $7 million to I.C. Power on April 14, 2014, therefore, the final purchase price of AEI Nicaragua Holdings was $30
million.

2. AEI Jamaica Holdings Ltd.

On May 30, 2014, I.C.Power took control of AEI Jamaica Holdings and paid $18 million to AEI Power Ltd. in relation to the acquisition. As a result of the post-closing purchase price
adjustments, I.C. Power paid an additional $3 million to AEI Power Ltd. on July 1, 2014; therefore, the final purchase price of AEI Jamaica Holdings was $21 million.

F - 59

 
 
 
 
   
   
   
   
   
   
 
 
 
 
 
 
 
Note 11 – Subsidiaries (Cont’d)

As of result of this transaction, I.C. Power increased its ownership from 15.57% to 100% in Jamaica Private Power Company (a subsidiary of AEI Jamaica Holdings). The measurement
to  fair  value  of  I.C.  Power’s  pre-existing  share  in  Jamaica  Power  Company  resulted  in  a  gain  of  $3  million  ($6  million  less  $3  million  carrying  amount  of  such  investment  at  the
acquisition date).

3. Surpetroil S.A.S (“Surpetroil”)

On  March  12,  2014,  I.C.  Power  through  its  subsidiary  Samay  III  signed  a  share  purchase  agreement  to  acquire  a  60%  stake  of  Surpetroil,  involved  in  power  generation,  natural  gas
transport and distribution using Colombia’s stranded gas, as well as a 60% stake in two companies: Surenergy S.A.S. E.S.P. (Colombia) and Surpetroil S.A.S. (Peru) for a total purchase
price of $18 million. On March 28, 2014, I.C. Power took control of Surpetroil and paid $12 million at closing. The remaining $6 million has been retained by I.C. Power to be reinvested
by the minority shareholders in new projects. As of December 31, 2016, there is no outstanding balance.

4. AEI Guatemala Holdings Ltd.

On August 13, 2014, I.C. Power entered into an agreement with AEI Power Ltd. to acquire all of the shares of AEI Guatemala Holdings Ltd for a purchase price of $29 million. On
September 17, 2014, I.C. Power completed the acquisition of AEI Guatemala Holdings and paid $29 million to AEI Power Ltd.

On October 22, 2014, I.C. Power paid an additional of $6 million as a result of the post-closing purchase price adjustments, and $350 thousand for reorganization costs. Therefore, the
final purchase price of AEI Guatemala Holdings was $35 million.

d.

Identifiable assets acquired and liabilities assumed

  1. The following table summarizes the amounts of the fair values of the identifiable assets acquired and liabilities assumed at their respective acquisition dates:

AEI Nicaragua

AEI Jamaica

Surpetroil
$ thousands

  AEI Guatemala

Total

Property, plant and equipment
Intangible
Deferred income tax assets
Trade receivables
Other assets
Short-term borrowings
Long-term debt
Deferred income tax liabilities
Other liabilities
Non-controlling interest
Fair value of net assets acquired
Fair value of pre-existing investment
Total consideration
Gain on bargain purchase
Goodwill*

Cash consideration
Consideration retained by I.C. Power
Total consideration transferred
Cash and cash equivalent acquired
Net cash flow on acquisition

*   

 This amount is not deductible for tax purposes.

39,585 
3,305 
179 
5,998 
24,325 
(1,722)  
(10,199)  
(1,102)  
(9,532)  
— 
50,837 
(6,044)  
(20,677)  
24,116 
— 

20,677 
— 
20,677 
(5,371)  
15,306 

15,173 
5,168 
201 
900 
1,835 
(2,361)  
(2,390)  
(2,671)  
(2,901)  
(5,182)  
7,772 
— 

(18,000)  

— 
10,228 

12,000 
6,000 
12,000 

(168)  

11,832 

60,896 
925 
76 
31,939 
38,777 
(17,500)  
(23,021)  
(7,550)  
(29,181)  

— 
55,361 
— 

(34,918)  
20,443 
— 

34,918 
— 
34,918 
(2,881)  
32,037 

272,865 
30,181 
2,831 
67,909 
105,653 
(21,583)
(150,851)
(45,045)
(58,418)
(35,800)
167,742 
(6,044)
(103,716)
68,210 
10,228 

97,716 
6,000 
97,716 
(27,730)
69,986 

157,211 
20,783 
2,375 
29,072 
40,716 
— 

(115,241)  
(33,722)  
(16,804)  
(30,618)  
53,772 
— 

(30,121)  
23,651 
— 

30,121 
— 
30,121 
(19,310)  
10,811 

F - 60

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 11 – Subsidiaries (Cont’d)

2. Measurement of fair values

I.C. Power has established the  fair values of the acquired assets, liabilities, and contingent liabilities considering the fair value basis on March 12, 2014; March 28, 2014; May 30, 2014;
and on September 17, 2014, dates in which

I.C. Power took control of AEI Nicaragua Holdings, Surpetroil, AEI Jamaica Holdings and AEI Guatemala Holdings, respectively. The criteria considered to establish the fair value of
the main items were the following:

· Fixed assets were valued considering the market value established by an appraiser;
Intangibles consider the valuation of its Power Purchase Agreements (PPAs);
·
· Contingent liabilities were determined over the average probability established by third party legal processes;
· Deferred tax was valued over the temporary differences between the accounting and tax basis of the business combination; and,
· Non-controlling interest was calculated over a proportional basis of the net assets identified on the acquisition date.

3. Gain of bargain purchase

After reviewing and analyzing the fair values of the Nicaraguan, Jamaican and Guatemalan assets and comparing them to the carrying value, a gain on bargain purchase of $24 million,
$24 million and $20 million, respectively, was determined. The differences between fair value and carrying value are derived in principal:

·
·
·

Seller´s need to complete transaction.
Lack of alternative buyers.
Regions low interest from international power players.

4. Recognition of Revenues and Profit or Loss

During the period from the acquisition date to December 31, 2014, the revenues and profit or loss contributed by these acquired companies to the consolidated results are as follows:

Companies acquired

Control Date

AEI Nicaragua Holdings Ltd
Surpetroil S.A.S.
AEI Jamaica Holdings Ltd.
AEI Guatemala Holdings Ltd.
Total

March 12, 2014
March 28, 2014
May 30, 2014
September 17, 2014

Revenues

Profit (loss)*

$ thousands

124,578 
9,263 
40,752 
33,302 
207,895 

5,874 
1,759 
(2,242)
(1,028)
4,363 

The amounts included in the Group’s 2014 consolidated financial statements for these acquisitions are immaterial. Also, no pro-forma financial information has been included as effects
are immaterial.

* These figures do not include any effect arising from the purchase price allocation adjustments and from non-controlling interest.

F - 61

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 11 – Subsidiaries (Cont’d)

2.

   I.C. Green

a.

On December 9, 2014, I.C. Green Energy (“ICG”) signed an agreement for the sale of all its holdings (about 69%) in the shares of Petrotec AG (“Petrotec”), a public company traded on
the Frankfurt stock exchange, to the Renewable Energy Group (“REG”), a public company traded on the NASDAQ. As part of the agreement, REG paid ICG in exchange for Petrotec’s
shares, the amount of $20.9 million, by means of an issuance of shares of REG, along with payment of an additional amount in cash, of $15.8 million, in respect of the balance of loans and
accrued interest ICG granted to Petrotec.

On December 24, 2014 (“the Closing Date”), all the approvals required for execution of the agreement were received and the Group ceased to control Petrotec.

The fair value of the restricted shares was $18 million. As a result of the sale, the Group reported a capital loss of $5 million in its financial statements.

During 2014, ICG received 2,070,538 REG shares at a price of $10.1133 per share. Due to restrictions on the shares, they were recorded in ICG's books in a value of $18 million.

During 2015, ICG sold 1,380,358 shares in a total sum of $13 million and ICG recorded a finance income of $587 thousand from adjustment of REG shares to fair value.

The value of REG shares in ICG's books as of December 31, 2015 is $6 million and all REG shares were sold as of December 31, 2016.

b.

In 2014, due a lack of sufficient sources of financing for 2015, the Board of Directors of HelioFocus decided to reduce HelioFocus’ activities and to maintain only a minimum number of
personnel until new investors are recruited.

As a result, the Group examined the amount of its investment in HelioFocus and decided to write down the balance to the amount of about $1.5 million in 2014, representing the cash
equivalents less the pension liabilities. As a result of the write down, the Group recorded a capital loss of $13 million in 2014.

As of December 31,2016, HelioFocus is in process of voluntary liquidation.

c.

d.

As  of  December  31,  2016,  ICG  held  90.85%  of  the  shares  of  Primus  Green  Energy  Inc.  (“PGE”).  In  2016,  ICG  granted  PGE  additional  $7.5  million  as  convertible  bridge  financing
agreement. On December 10, 2016, all of the convertible loans including interest have been consolidated to a convertible bridge financing agreement in the amount of $26 million with
interest of 7% annually and will be repayable on June 30, 2017.

PGE’s future is highly dependent on combination of factors, such as the timeliness and successful completion of additional financing; the success of its research and development activities;
designing,  constructing  and  operating  successful  production  plants;  and  continued  accessibility  to  funding  from  investment  agreement  with  ICG  and  subject  to  price  of  available
technologies and energy sources.  As a result of above uncertainties, ICG decided to write-off its goodwill in PGE in the amount of $6 million in 2015.

3.

I.C. Power Pte Ltd (now known as I.C. Power Ltd)

On  December  13,  2016,  I.C.  Power  Singapore,  filed  Amendment  No.4  to  a  Registration  Statement  on  Form  F-1  with  the  U.S.  Securities  and  Exchange  Commission  relating  to  the
proposed initial public offering of ordinary shares of I.C. Power Singapore.

F - 62

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 11 – Subsidiaries (Cont’d)

B. The following table summarizes the information relating to each of the Group’s subsidiaries in 2016 and 2015 and combined entities in 2014 that has material NCI:

2016

As at and for the year ended December 31
2015

2014

Samay
I.S.A  

Nicaragua
Energy
Holding *  

Kallpa
Generacion
S.A.

Cerro del
Aguila
S.A.

Samay
I.S.A  

Nicaragua
Energy
Holding  

Kallpa
Generacion
S.A.
$ thousands          

Cerro del
Aguila
S.A.

Samay
I.S.A  

Nicaragua
Energy
Holding  

Kallpa
Generacion
S.A.

Cerro del
Aguila
S.A.

NCI percentage
Current assets
Non-current assets
Current liabilities
Non-current liabilities
Net assets

Carrying amount of
NCI

25.10%   
75,485 
    380,947 

(73,846)    
    (311,030)    
71,556 

35.42%   
41,630 
144,313 
(26,053)    
(100,834)    
59,056 

25.10%   

25.10%   
53,843 
    949,440 

25.10%   
47,766 
    344,052 

108,246 
611,928 
(55,323)    
(36,075)    
(85,935)    
(511,277)     (618,219)     (289,560)    
153,574 

    299,129 

66,183 

35.42%   
43,390 
172,917 
(22,044)    
(121,142)    
73,121 

25.10%   

25.10%   
23,841 
    847,015 

25.10%   
92,120 
638,325 
(188,291)    
(18,713)    
(25,909)    
(356,900)     (556,277)     (144,679)    
185,254 

    138,153 
    102,668 

    288,670 

77,429 

35.42%   
52,850 
172,240 
(23,376)    
(131,327)    
70,387 

25.10%

25.10%   
    128,242 
83,954 
    662,055 
645,927 
(153,302)    
(25,138)
(405,360)     (460,081)
    305,078 
171,219 

17,961 

20,918 

38,547 

75,081 

16,612 

25,899 

46,499 

72,456 

19,435 

24,931 

42,976 

76,575 

Revenues
Profit/(loss)
Other comprehensive
income/(loss)
Profit attributable to
NCI
OCI attributable to NCI    

40,000 
548 

4,825 

138 
1,211 

90,017 
7,511 

— 

2,660 
— 

438,475 
35,820 

49,646 
9 

— 
(4,049)    

111,428 
14,469 

447,679 
44,088 

— 
(8,579)    

— 
(311)    

124,578 
4,472 

436,673 
53,090 

— 
6,964 

— 

10,449 

(6,057)    

— 

(53)    

(1,079)    

(245)    

— 

1,150 

(6,938)

8,991 
— 

2 
2,623 

(1,016)    
(1,520)    

5,125 
— 

11,066 

(13)    

(2,153)    
(271)    

(78)    
(62)    

1,584 
— 

13,326 
289 

1,748 
(1,742)

Cash flows from
operating activities
Cash flows from
investing activities
Cash flows from
financing activities
excluding dividends
paid to non-controlling
interests
Dividends paid to non-
controlling interests
Effect of changes in the
exchange rate on cash
and cash equivalents
Net increase/(decrease)
in cash equivalents

(1,276)    

17,737 

114,838 

25,629 

— 

42,480 

120,438 

— 

— 

16,605 

116,915 

— 

(60,468)    

(931)    

(16,082)    

(69,372)     (236,207)    

(5,088)    

(13,589)     (180,771)    

(88,644)    

19,522 

(26,259)     (247,724)

— 

(4,004)    

(16,943)    

— 

    138,000 

(26,139)    

(91,084)    

95,000 

    195,135 

(20,445)    

(78,982)     296,868 

47,088 

(26,440)    

(88,911)    

62,823 

— 

(4,401)    

(7,530)    

— 

— 

— 

— 

— 

373 

(348)    

198 

369 

(3,266)    

(489)    

(5,334)    

(2,929)    

(265)    

411 

(824)    

— 

(14,283)    

(13,986)    

(6,900)    

19,449 

    (101,473)    

6,363 

2,901 

(88,700)     106,226 

16,093 

10,850 

49,144 

* Includes Empresa Energética Corinto, Tipitapa Power Company, Centrans Energy Holdings (Amayo) and Arctas Amayo (Fase II).

F - 63

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
  
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
 
Note 11 – Subsidiaries (Cont’d)

C.

Restrictions

I.C. Power

Inkia´s subsidiaries have no restrictions to transfer cash or other assets to the parent company as long as each subsidiary is in compliance with the covenants derived from the borrowing
agreements described in Note 15.

OPC originally had restrictions to transfer cash or paid dividends up to the third anniversary of Construction Completion. On October 13, 2015, OPC and its senior lenders amended this
restriction in order to allow OPC to transfer cash and pay dividends, which ended on June 30, 2015. Therefore, on October 19, 2015, OPC paid NIS 295 million (equivalent to $77 million).
Out of this total, NIS 222 million (equivalent to $58 million) was paid as repayment of capital notes and NIS 73 million (equivalent to $19 million) as intercompany loan.

Inkia has restrictions to transfer cash or other assets to I.C. Power. Pursuant to its senior notes agreement, dividend payments are treated as restricted payments and are subject to mainly the
following conditions:

•   Inkia is able to incur at least $1.00 of additional indebtedness pursuant to satisfying a covenant test (unconsolidated interest coverage ratio is equal or greater than 2.0 to 1.0); and

•   The amount (dividend payments) cannot exceed the sum of: 100% of cumulative consolidated net income of I.C. Power accrued on a cumulative basis, beginning on January 1, 2011 to
the end of the most recent fiscal quarter, deducting any non-cash charges or expense (other than depreciation and amortization), non-cash gains and the cumulative effect of changes in
accounting principles.

Note 12 – Deposits, Loans and Other Receivables, including Derivative Instruments

Composition:

Deposits in banks and others – restricted cash
Long-term trade receivable
Financial derivatives not used for hedging
Tower-series 9 options
Income tax receivables and tax claims (1)
Other receivables (2)

(1) As at December 31, 2016 and 2015, the income tax receivable and tax claims – non-current distribution is as follows:

Energuate tax claim (See Note 20.B.f) 
Kallpa tax claim (See Note 20.B.d) 
Income tax credit from Nicaraguan companies
Income tax credit from PQP 
Other 

As at December 31

2016

2015

$ thousands

16,690 
10,120 
1,342 
— 
99,892 
48,731 
176,775 

16,521 
— 
2,863 
12,175 
19,669 
37,247 
88,475 

As at December 31

2016

2015

$ thousands

80,192 
9,709 
5,694 
3,996 
301 

99,892 

— 
9,550 
5,815 
4,304 
— 

19,669 

(2) As of December 31, 2016 and 2015, other receivables correspond mainly to the VAT incurred in the construction of Cerro del Aguila and Samay I (“Puerto Bravo”) power plants and

non-current prepaid expenses in OPC. In 2016, both power plants have the tax benefit of recovering the VAT incurred during the construction stage on a regular basis.

F - 64

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 13 – Property, Plant and Equipment, Net

A.

Composition

Balance at
beginning
of year

Additions

Disposals

As at December 31, 2016

Differences in
translation
reserves
$ thousands

Acquisition as
part of business
combination

Transfers
and
Reclassifications  

Balance at
end of
year

288,538 

1,840,754 
138,310 

52,124 
2,319,726 
1,260,375 
44,299 
3,624,400 

71,953 

530,324 
46,764 

21,538 
670,579 

7,759 

46,652 
159 

25,866 
80,436 
217,278 
20,139 
317,853 

13,169 

123,275 
1,742 

20,591 
158,777 

(1,244)

(35,616)
(965)

(8,958)
(46,783)
(167)
(477)
(47,427)

(1,434)

(16,512)
(121)

(2,665)
(20,732)

629 

7,350 
— 

12,129 
20,108 
385 
281 
20,774 

48 

970 
— 

212 
1,230 

2,441 

— 
— 

375,063 
377,504 
7,839 
7,152 
392,495 

— 

— 
— 

— 
— 

743,600 

586,439 
26,965 

(872)
1,356,132 
(1,354,532)
(2,540)
(940)

1 

(263)
— 

263 
1 

1,041,723 

2,445,579 
164,469 

455,352 
4,107,123 
131,178 
68,854 
4,307,155 

83,737 

637,794 
48,385 

39,939 
809,855 

2,953,821 

159,076 

(26,695)

19,544 

392,495 

(941)

3,497,300 

6,057 
2,959,878 

— 
3,497,300 

Cost
Land, roads, buildings and
leasehold  improvements
Installations, machinery and
equipment
Dams
Office furniture and  equipment
and motor vehicles

Plants under construction
Spare parts for installations

Accumulated depreciation
Land, roads, buildings and
leasehold  improvements
Installations, machinery and
equipment
Dams
Office furniture and  equipment
and motor vehicles

Balance as at December 31,
2016

Prepayments on account of
property, plant & equipment

F - 65

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
 
 
Note 13 – Property, Plant and Equipment, Net (Cont’d)

Balance at
beginning of year  

Additions

Disposals

As at December 31, 2015
Differences in
translation
reserves
$ thousands

Acquisition as
part of business
combination

Transfers and
Reclassifications  

Balance at
end of year

4,792 

35,148 
— 

9,140 
49,080 
477,231 
48,078 
574,389 

6,744 

102,214 
1,499 

3,499 
113,956 
460,433 

(144)  

(5,775)  
(929)  

(1,866)  
(8,714)  
(176)  
(116)  
(9,006)  

(34)  

(2,077)  
(224)  

(1,661)  
(3,996)  
(5,010)  

(503)  

(4,954)  
— 

(508)  
(5,965)  
(393)  
(40)  
(6,398)  

(56)  

(677)  
— 

(95)  
(828)  
(5,570)  

— 

— 
— 

— 
— 
8,981 
— 
8,981 

— 

— 
— 

— 
— 
8,981 

Cost
Roads, buildings and leasehold 
improvements
Installations, machinery and
equipment
Dams
Office furniture and  equipment,
motor vehicles and other 
equipment

Plants under construction
Spare parts for installations

Accumulated depreciation
Roads, buildings and leasehold 
improvements
Installations, machinery and
equipment
Dams
Office furniture and  equipment,
motor vehicles and other 
equipment

Prepayments on account of
property, plant & equipment

B.

Net carrying values

280,618 

1,779,476 
138,260 

43,381 
2,241,735 
789,681 
27,084 
3,058,500 

64,473 

429,499 
45,489 

20,829 
560,290 
2,498,210 

4,577 
2,502,787 

Roads, buildings and leasehold improvements
Installations, machinery and equipment
Dams
Office furniture and equipment, motor vehicles and other equipment
Plants under construction
Spare parts for installations

3,775 

36,859 
979 

1,977 
43,590 
(14,949)  
(30,707)  
(2,066)  

826 

1,365 
— 

(1,034)  
1,157 
(3,223)  

288,538 

1,840,754 
138,310 

52,124 
2,319,726 
1,260,375 
44,299 
3,624,400 

71,953 

530,324 
46,764 

21,538 
670,579 
2,953,821 

6,057 
2,959,878 

As at December 31

2016

2015

$ thousands

957,986 
1,807,785 
116,084 
415,413 
131,178 
68,854 
3,497,300 

216,585 
1,310,430 
91,546 
30,586 
1,260,375 
44,299 
2,953,821 

(1) During the period ended December 31, 2016, the Group acquired assets with a cost of $319 million, mainly for the construction of the Cerro del Aguila and Samay facilities and acquired assets for

an amount of $392 million in relation to Estrella Corporation BA business combination (See Note 11.A.1.a).

(2) During the period ended December 31, 2015, the Group acquired assets with a cost of $576 million and $9 million in relation to AIE business combinations (See Note 11.A.1.b).

F - 66

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 13 – Property, Plant and Equipment, Net (Cont’d)  

(3)

In April 2016, Kanan’s 92 MW thermal generation project reached their commercial operation (“COD”).

(4)

In May 2016, the four operating units of Samay I were declared operational.  In July 2016, the plant demonstrated above normal operational indicators. Personnel from Samay, Posco (“EPC
Contractor”) and General Electric (“GE”) inspected the units. Those inspections revealed structural damage to three of the four plant units, as compressor and generators shafts were damaged.
All four units were declared unavailable to the system. Additionally, Government entities (Ministry of Energy and Mines and “OSINERGMIN”) were informed of the force majeure event as
well as the Lenders and the Insurance counterparties were informed of the occurrences.

The total net carrying value of the identified damaged parts from Units 2, 3 and 4 amounts to $14.2 million and these damaged parts were determined to have no future or disposal value.
Consequently, during 2016, Samay I recognized an impairment charge for the net carrying value of these assets.

Samay I´s management has developed a plan to repair the units, and, based upon current estimates, it is expected that all four units should be operational within the next six months. Samay I´s
management  intends  to  seek  coverage  for  the  costs  of  the  outage,  including  repair  costs  and  loss  of  profits,  as  appropriate,  from  the  EPC  contractor,  equipment  manufacturer  and/or  the
insurance  coverage  (subject  to  deductibles),  and  believes  there  is  a  reasonable  basis  to  recover  these  costs,  including  for  loss  of  profits.  The  EPC  Contract  establishes  that  the  cost  of
remedying any defects in order to provide Samay with a fully functional plant are to be borne by the EPC Contractor, unless proven by the EPC Contractor that the cause of failure was not
attributable  to  it.  In  addition,  Samay  I  carries  a  property  damage  and  business  interruption  insurance  coverage  for  its  assets  to  protect  against  all  risks  of  direct  physical  loss  or  damage
including machinery breakdown, earthquake and other main risks associated with the operation of the plant. The coverage includes (1) property damage with a limit of $293.5 million and (2)
business  interruption  with  a  18-month  indemnity  period  with  a  limit  of  $72.6  million.  Samay’s  management  deems  that  this  event  is  covered  by  the  insurance  policy.  Therefore,  as  of
December 31, 2016, it recognized a receivable of $8.8 million representing the original amount of $14.2 million equivalent to the value of the damaged parts less the value of replacements
parts and net of the insurance deductibles, see Note 8.

(5) On August 3, 2016, two out of the three units of CDA were declared fully operational. On August 25, 2016, the third generating unit of CDA was declared fully operational, reaching the COD

of the power plant. With the completion of this unit, CDA is now capable of generating 545MW as of December 31, 2016.

C. When there is any indication of impairment, the Group’s entities perform impairment tests for their long lived assets using fair values less cost to sell based on independent appraisals or value in

use estimations, with similar assumptions as those described (Note 14.D).

D.        The amount of borrowing costs capitalized during 2016 was $14 million ($32 million during 2015).

F - 67

 
 
 
 
 
 
 
 
 
 
Note 13 – Property, Plant and Equipment, Net (Cont’d)  

E.

In I.C. Power, property, plant and equipment includes assets acquired through financing leases. As at December 31, 2016 and 2015, the cost and corresponding accumulated depreciation of such
assets are as follows:

As of December 31, 2016
Accumulated
depreciation

Cost

Net cost

Cost

$ thousands

As of December 31, 2015
Accumulated
Depreciation

Net cost

Land, roads, buildings and leasehold improvements
Installations, machinery and equipment
Motor vehicles

42,288 
275,852 
410 
318,550 

(6,602)  
(117,368)  
(46)  
(124,016)  

35,686 
158,484 
364 
194,534 

42,281 
275,674 
— 
317,955 

(5,545)  
(104,401)  

— 

(109,946)  

36,736 
171,273 
— 
208,009 

F.

The composition of the depreciation expense is as follows:

Depreciation charged to results
Depreciation charged to fixed assets*

*Depreciation expenses on motor vehicles of projects under construction (CDA and Samay I) are capitalized.

Depreciation charged to cost of sales
Depreciation charged to general, selling and administrative expenses
Depreciation charged to results
Amortization of intangibles charged to cost of sales

Amortization of intangibles charged to general, selling and administrative expenses
Depreciation and amortization

As at December 31

2016

2015

$ thousands

159,379     
(602)    
158,777     

114,855 
(899)
113,956 

As at December 31

2016

2015

$ thousands

154,071 
5,308 
159,379 

5,624 
7,378 
172,381 

105,725 
9,130 
114,855 

5,192 
— 
120,047 

G.

The Group has fully depreciated assets that are still in operation. As at December 31, 2016, the original cost of such assets was $134 million ($88 million as at December 31, 2015).

F - 68

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
   
   
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 14 – Intangible Assets, Net

A.

Composition:

Cost
Balance as at January 1, 2016
Acquisitions as part of business combinations
Acquisitions – self development
Disposals
Reclassification
Translation differences
Balance as at December 31, 2016

Amortization and impairment
Balance as at January 1, 2016
Amortization for the year
Disposals
Translation differences
Balance as at December 31, 2016

Carrying value
As at January 1, 2016
As at December 31, 2016

Goodwill

Concessions
licenses*

Customer

relationships**  

Software

Others***

Total

$ thousands

79,581 
37,102 
— 
— 
— 
867 
117,550 

21,455 
— 
— 
— 
21,455 

58,126 
96,095 

— 
189,351 
— 
— 
— 
— 
189,351 

— 
5,434 
— 
— 
5,434 

— 
183,917 

41,074 
— 
— 
— 
— 
— 
41,074 

16,888 
4,054 
— 
— 
20,942 

24,186 
20,132 

1,776 
— 
138 
(153)  
— 
10 
1,771 

937 
227 
(153)  
4 
1,015 

839 
756 

68,806 
5,796 
9,331 
— 
(161)  
125 
83,897 

4,713 
3,287 
— 
19 
8,019 

64,093 
75,878 

191,237 
232,249 
9,469 
(153)
(161)
1,002 
433,643 

43,993 
13,002 
(153)
23 
56,865 

147,244 
376,778 

*

It corresponds to the fair value of DEORSA’s and DEOCSA’s concessions, which were granted by the Ministry of Energy and Mines of Guatemala - MEM in 1998 to DEORSA and DEOCSA to
operate power distribution business in defined geographic areas for a term of 50 years. The remaining useful lives of DEORSA and DEOCSA’s concessions to operate in their respective defined
geographic areas are each 33 years.

** Comprise mainly identified intangible assets as a result of the business combination such as the acquisition of “customer relationships” and others in the purchase of its subsidiaries and associates.

*** Includes development cost which corresponds to expenditures incurred in the design and evaluation of future power plant facilities in the countries in which the Company currently operates. These

projects have different level of advance such as: temporal concessions, environmental impact studies in process and others .

Balance mainly corresponds to cost incurred in the construction and improvements of public access roads in connection with CDA project, and the development costs of two hydroelectrical projects
in Peru and two thermal projects in Chile.

F - 69

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 14 – Intangible Assets, Net (Cont’d)

A.

Composition (Cont’d):

Cost
Balance as at January 1, 2015
Acquisitions as part of business combinations
Acquisitions – self development
Disposals
Reclassification
Translation differences
Balance as at December 31, 2015

Amortization and impairment
Balance as at January 1, 2015
Amortization for the year
Acquisitions – business combination
Disposals
Reclassification
Impairment
Translation differences
Balance as at December 31, 2015

Carrying value
As at January 1, 2015
As at December 31, 2015

Goodwill

Customer
relationships*

Software

Others **

Total

$ thousands

81,484 
119 
— 
— 
— 
(2,022)  
79,581 

15,537 
— 
— 
— 
— 
5,918 
— 
21,455 

65,947 
58,126 

41,074 
— 
— 
— 
— 
— 
41,074 

12,591 
4,297 
— 
— 
— 
— 
— 
16,888 

28,483 
24,186 

1,522 
— 
194 

(8)  
71 
(3)  

1,776 

709 
214 
— 
(8)  
22 
— 
— 
937 

813 
839 

53,459 
464 
15,070 
— 
(177)  
(10)  

68,806 

4,031 
681 
— 
— 
— 
— 
1 
4,713 

49,428 
64,093 

177,539 
583 
15,264 
(8)
(106)
(2,035)
191,237 

32,868 
5,192 
— 
(8)
22 
5,918 
1 
43,993 

144,671 
147,244 

*

Comprise mainly identified intangible assets as a result of the business combination such as the acquisition of “customer relationships” and others in the purchase of its subsidiaries and associates.

**

Includes development cost which corresponds to expenditures incurred in the design and evaluation of future power plant facilities in the countries in which the Company currently operates. These
projects have different level of advance such as: temporal concessions, environmental impact studies in process and others .

Balance mainly corresponds to cost incurred in the construction and improvements of public access roads in connection with CDA project, and the development costs of two hydroelectrical projects
in Peru and two thermal projects in Chile.

B.

The total carrying amounts of intangible assets with a finite useful life and with an indefinite useful life or not yet available for use

Intangible assets with a finite useful life
Intangible assets with an indefinite useful life or not yet available for use

F - 70

As at December 31

2016

2015

$ thousands

280,683 
96,095 
376,778 

25,673 
121,571 
147,244 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 14 – Intangible Assets, Net (Cont’d)

C.

Examination of impairment of cash generating units containing goodwill

For the purpose of testing impairment, goodwill is allocated to the Group’s cash-generating units that represent the lowest level within the Group at which the goodwill is monitored for
internal management purposes.

Goodwill arises from the following Group entities in I.C. Power (cash generating unit):

Nejapa
Kallpa
Energuate*
Surpetroil*
AIE*

As at December 31

2016

2015

$ thousands

40,693 
10,934 
37,651 
6,699 
118 
96,095 

40,693 
10,934 
— 
6,383 
116 
58,126 

* Goodwill in Colombia’s, Israel’s and Guatamalan’s subsidiaries recorded in Columbian pesos, New Israeli shekels and Guatamalan Quetzales, respectively; translated into US dollars at the
exchange rate at the reporting date.

D.       Impairment testing

The recoverable amount of each CGU is based on the estimated value in use using discounted cash flows. The cash flows are derived from the 5-year budget.

The key assumptions used in the estimation of the recoverable amount are shown below. The values assigned to key assumptions represent management of the Group´s assessment of future
trends in the power sector and have been based on historic data from external and internal sources.

Discount rate
Peru
Energuate
El Salvador
Colombia
Terminal value growth rate

2016

2015

In percent
6.7 
8.9 
9.8 
8.2 
2 

7.4 
— 
10.0 
9.2 
1.2-2.0 

The discount rate is a post-tax measure based on the characteristics of each CGU with a possible debt leveraging of 32% in 2016 and of 48% in 2015.

The cash flow projections included specific estimates for five years and a terminal growth rate thereafter. The terminal growth rate was determined based on management´s estimate of the
long term inflation

In addition to the discount and growth rates, the key assumptions used to estimate future cash flows, based on past experience and current sector forecasts, are as follows:

•

Existing power purchase agreements (PPAs) signed and existing number of customers

F - 71

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
 
 
 
    
 
 
 
 
 
 
 
 
Note 14 – Intangible Assets, Net (Cont’d)

•

•

•

•

•
•
•

Investment schedule—I.C. Power Management has used the updated investment schedule in countries in which those companies operate, in order that the supply satisfies the demand
growth in an efficient manner.
The production mix of each country was determined using specifically-developed internal forecast models that consider factors such as prices and availability of commodities, forecast
demand of electricity, planned construction or the commissioning of new capacity in the country’s various technologies.
The distribution business profits were determined using specifically-developed internal forecast models that consider factors such as forecasted demand, fuel prices, energy purchases,
collection rates, percentage of losses, quality service improvement, among others.
Fuel prices have been calculated based on existing supply contracts and on estimated future prices including a price differential adjustment specific to every product according to local
characteristics.
Assumptions for energy sale and purchase prices and output of generation facilities are made based on complex specifically-developed internal forecast models for each country.
Demand—Demand forecast has taken into consideration the most probable economic performance as well as growth forecasts of different sources.
Technical  performance—The  forecast  takes  into  consideration  that  the  power  plants  have  an  appropriate  preventive  maintenance  that  permits  their  proper  functioning  and  the
distribution business has the required capital expenditure to expand and perform properly in order to reach the targeted quality levels.

Sensitivity to changes in assumptions

With regard to the assessment of value in use of the CGUs, management believes that no reasonably possible change in any of the above key assumptions would cause the carrying value of
Nejapa, Kallpa, AIE, Energuate and Surpetroil to materially exceed its recoverable amount.

Note 15 – Loans and Debentures

Following are the contractual conditions of the Group’s interest bearing loans and credit, which are measured based on amortized cost. Additional information regarding the Group’s exposure to interest
risks, foreign currency and liquidity risk is provided in Note 31, in connection with financial instruments.

Current liabilities
  Short-term credit:
  Short-term loans from banks and financial institutions

  Current maturities of long-term liabilities:
  Loans from banks and financial institutions
  Non-convertible debentures
  Liability in respect of financing lease

  Total current liabilities

Non-current liabilities
  Loans from banks and financial institutions
  Non-convertible debentures
  Liability in respect of financing lease
  Other long-term balances*
  Total other long-term liabilities
  Less current maturities
  Total non-current liabilities

As at December 31 

2016

2015

$ thousands

213,417 
213,417 

251,803 
10,617 
6,976 
269,396 
482,813 

1,903,323 
867,287 
88,169 
240,213 
3,098,992 
(269,396)  
2,829,596 

179,317 
179,317 

132,222 
15,400 
25,729 
173,351 
352,668 

1,550,480 
671,247 
163,774 
152,760 
2,538,261 
(173,351)
2,364,910 

* Included in the Other long-term balances were mainly the loan payable of $224 million to IC (See Note 1.B.1.b) and $16 million to Ansonia (See Note 10.C.b.5).

F - 72

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                                                                                                                                                                                                      
 
 
Note 15 – Loans and Debentures (Cont’d)

A.   

 Composition of I.C. Power loans from Banks and Others (Cont’d)

Short-term loans from banks
I.C. Power Distribution Holdings
Credit Suisse (D)
Samay
Interbank
DEOCSA

    Various entities

DEORSA

    Various entities

CDA
Banco de Crédito del Perú
PQP
Banco Industrial Guatemala
Cobee
Various entities
Nejapa
Scotiabank El Salvador
Banco America Central
Empresa Energética Corinto Ltd
Banco de América Central (BAC)
Cepp
Scotiabank
BHD Bank
Surenergy
Banco Davivienda
Kallpa Generación
Banco de Crédito del Perú
Scotiabank Perú
Surpetroil

Various entities

Cenergica
Banco America Central
I.C. Power Chile Inv
Scotiabank
Subtotal

Nominal annual
Interest rate

LIBOR + 4%

2.9%

LIBOR + 4.75%

LIBOR + 4.75%

0.83%

4.75%

4.2% / 5.5%

5.50%
4.25%

5.25%

2.4%
2.53%

DTF + 4.5%

0.69%
0.63%

DTF+2.95%/4.15%  

IBR+4.25%

4.25%

TAB + 1.20%

As at
December 31,2016

As at
December 31,2015

$ thousands

Currency

Maturity

Current

Non-Current

Current

Non-Current

USD

USD

USD

USD

USD

USD

BOB

USD
USD

USD

USD
USD

COP

USD
USD

COP

USD

CLP

2017

2017

2017

2017

2017

2017

2016/2017

2017
2016

2017

2017
2017

2017

2016
2016

2016/2015

2016

2016

F - 73

119,487 

31,945 

18,000 

12,000 

14,000 

6,000 

4,499 

4,200 
— 

1,586 

1,000 
200 

500 

— 
— 

— 

— 

— 
213,417 

— 

— 

— 

— 

— 

— 

— 

— 
— 

— 

— 
— 

— 

— 
— 

— 

— 

— 
— 

117,334 

— 

— 

— 

— 

— 

4,525 

5,000 
1,200 

— 

— 
3,000 

— 

30,000 
15,000 

2,069 

700 

489 
179,317 

— 

— 

— 

— 

— 

— 

— 

— 
— 

— 

— 
— 

— 

— 
— 

— 

— 

— 
— 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

A.   

 Composition of I.C. Power loans from Banks and Others (Cont’d)

Loans from Banks and others
Financial institutions:
Cerro del Aguila (E)

Tranche A

Tranche B

Tranche 1D

Tranche 2D

Samay I (F)

Sumitomo /HSBC / Bank of Tokyo

Central Cardones (G)
Tranche One
BCI / Banco Itaú
Tranche Two
BCI / Banco Itaú
Colmito (H)
Banco Bice
Consorcio Eólico Amayo, S.A. (I)
Banco Centroamericano de
Integración Económica

Consorcio Eólico Amayo (Fase II),

S.A. (J)

Various entities

Empresa Energética Corinto, Ltd.
Banco de América Central (BAC)
Tipitapa Power Company, Ltd.
Banco de América Central (BAC)
Jamaica Private Power Company
Royal Bank of Canada
Burmeister & Wain Scandinavian

Contractor A/S
PQP (K)
Banco Industrial
PQP (K)
Banco Industrial
Surpetroil S.A.S
Banco de Occidente S.A
Banco Pichincha

Nominal annual
Interest rate

LIBOR+4.25% -
LIBOR +5.50%
LIBOR+4.25% -
LIBOR +6.25%
LIBOR+2.75% -
LIBOR +3.60%
LIBOR+2.75% -
LIBOR +3.60%

LIBOR+2.125% -
LIBOR +2.625%

LIBOR+1.90%

LIBOR+2.75%

7.90%

USD

USD

USD

USD

USD

USD

USD

CLP

8.45% - LIBOR +4%  

USD

LIBOR+5.75%,
8.53%,10.76%

8.35%

8.35%

LIBOR + 5.50%  

3.59%

USD

USD

USD

USD

USD

LIBOR + 4.50%  

USD

LIBOR + 4.50%  

USD

IBR + 5.87%
DTF + 3%

COP
COP

As at
December 31,2016

As at
December 31,2015

$ thousands

Currency

Maturity

Current

Non-Current

Current

Non-Current

2024

2024

2024

2027

2021

2021

2021

2028

2023

2025

2018

2018

2017

2018

2019

2021

2018
2017

F - 74

15,344 

— 

1,760 

— 

320,437 

180,896 

38,697 

21,959 

4,199 

2,261 

519 

280 

306,064 

164,803 

37,827 

20,369 

5,047 

302,247 

3,030 

282,369 

3,781 

— 

625 

18,228 

13,383 

16,121 

5,307 

37,376 

3,029 

3,124 

2,801 

824 

338 

— 

2,374 

504 
100 

28,250 

3,402 

3,328 

— 

233 

— 

9,632 

375 
— 

3,535 

— 

524 

4,428 

2,930 

2,865 

2,568 

4,011 

326 

4,268 

— 

— 
128 

22,008 

17,884 

15,799 

42,704 

31,279 

6,527 

6,130 

— 

571 

10,743 

— 

— 
95 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

A.   

 Composition of I.C. Power loans from Banks and Others (Cont’d)

Nominal annual
Interest rate

Currency

Maturity

Current

Non-Current

Current

Non-Current

As at
December 31,2016

As at
December 31,2015

$ thousands

Kanan ( L )
Scotiabank
Overseas Investments Peru (M)
Credit Suisse
Kallpa Generación (N)
Syndicated Loan—Various entities
DEORSA (O)

Syndicated Loan – various banks

Syndicated Loan -  various banks

DEOCSA (P)

Syndicated Loan – various banks

Syndicated Loan -  various banks

RECSA (Q)
Banco G&T Continental
OPC Rotem Ltd
Lenders Consortium (R)
Veolia Energy Israel Ltd. (S)
I.C. Power Israel Ltd (T)
Facility A—Amitim and Menora

Pension Funds

Facility B—Amitim and Menora

Pension Funds

ICPAD
Bank Hapoalim New York
AGS
Veolia Energy Israel Ltd
Sub total

LIBOR + 3.5%

USD

LIBOR + 5%-6.5%  

USD

LIBOR+6.00%

LIBOR + 4.7% -
LIBOR + 4.75%  

TAPP minus 5.6% -
TAPP minus 6.1%  

LIBOR + 4.7% -
LIBOR + 4.75%  

TAPP minus 5.6% -
TAPP minus 6.1%  

TAPP + 6.63%

4.85%-5.36%

4.85%-/7.75%

7.75%

0.75%

USD

USD

GTQ

USD

GTQ

GTQ

NIS
       NIS

NIS

NIS

USD

 NIS

2021

2017

2019

2021/2025

2021/2025

2021/2025

2021/2025

2020

2031
2016

2017

2029

2019

2019

F - 75

46,094 

97,274 

— 

10,167 

4,687 

— 

— 

— 

67,857 

30,653 

16,876 

107,488 

6,215 

931 

20,290 
— 

— 

4,311 

— 

43,127 

3,722 

344,240 
— 

— 

47,425 

12,000 

— 
251,803 

444 
1,651,520 

— 

— 

— 

— 

17,384 

41,279 

— 

— 

— 

— 

— 

16,272 
5,080 

41,313 

4,251 

12,000 

— 
132,172 

— 

— 

— 

— 

— 

360,295 
— 

— 

51,020 

— 

414 
1,418,180 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

A.   

 Composition of I.C. Power loans from Banks and Others (Cont’d)

Nominal annual
Interest rate

LIBOR+3.00%

LIBOR+2.05%

7.57%

7.15%

DTF + 3.5%

TAPP minus 2.47%

6.50%

9.00%
6.75%

7.00%
6.00%
7.00%

7.80%

6.70%

7.80%

5.75%

8.38%

8.50%

4.88%

6.00%

Liabilities in respect of
finance leases:
Kallpa Generación
Banco de Crédito del Perú/
Citibank (V)
Banco de Crédito del
Perú (W)
Scotiabank Perú (X)
Banco de Crédito del
Perú (Y)
Surpetroil S.A.S.
Banco de Occidente S.A.
DEORSA
Arrendadora Agromercantil  

Sub total
Debentures
Cobee
Bonds Cobee III-1B (Z)
Bonds Cobee III-1C
(bolivianos) (Z)
Bonds Cobee III-2 (Z)
Bonds Cobee III-3
(bolivianos) (Z)
Bonds Cobee IV-1A (AA)
Bonds Cobee IV-1B (AA)
Bonds Cobee IV-1C
(bolivianos) (AA)
Cobee Bonds-IV Issuance 3
(AA)
Cobee Bonds-IV Issuance 4
(bolivianos) (AA)
Cobee Bonds-IV Issuance 5
(bolivianos) (AA)
Inkia Energy Ltd
Inkia Bonds (BB)
Kallpa Generación
Kallpa Bonds (CC)
Kallpa Generación
Kallpa Bonds (DD)
Cepp
Cepp Bonds (EE)

Cobee
Cobee Bonds (Premium)
Subtotal
Total

Currency

Maturity

Current

Non-Current

Current

Non-Current

As at
December 31,2016

As at
December 31,2015

$ thousands

USD

USD

USD

USD

COP

GTQ

USD

BOB

USD

BOB

USD
USD

BOB

USD

BOB

BOB

USD

USD

USD

USD

2016

2017

2018

2023

2017

2017

2017

2020
2017

2022
2018
2020

2024

2019

2024

2026

2021

2022

2026

2019

USD-BOB

2017-2024

F - 76

— 

— 
— 

6,624 

223 

129 
6,976 
258,779 

1,750 

1,586 
5,000 

— 
— 
— 

— 

— 

— 

1,950 

— 

— 

— 

— 
10,286 

331 
10,617 
482,813 

— 

— 
— 

81,193 

— 

— 
81,193 
1,732,713 

— 

4,757 
— 

6,160 
3,988 
3,980 

12,030 

4,973 

15,039 

17,697 

447,904 

— 

325,970 

9,945 
852,443 

4,227 
856,670 
2,589,383 

2,334 

8,802 
7,508 

6,624 

461 

— 
25,729 
157,901 

1,750 

— 
— 

— 
— 
— 

— 

— 

— 

— 

— 

13,650 

— 

— 
15,400 

— 
15,400 
352,618 

— 

19,865 
30,248 

87,816 

116 

— 
138,045 
1,556,225 

1,750 

6,343 
5,000 

6,160 
3,977 
3,972 

12,023 

4,961 

15,035 

— 

447,524 

135,455 

— 

9,924 
652,124 

3,723 
655,847 
2,212,072 

 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

A.   

 Composition of I.C. Power loans from Banks and Others (Cont’d)

“ Depósitos a Término Fijo ”. Fixed-term deposits rate calculated by Colombia’s Central Bank.

DTF:
IBR:        “ Indicador Bancario de Referencia ”. Bank Indicator of Reference calculated by Colombia’ s Central Bank.
TAB:      “ Tasa Activa Bancaria ”. Short-term credits average interest rate calculated by Chile’s Bank’s Association.
TRE:

“Tasa de Referencia” . Weighted average for time deposits rates, calculated by Bolivia’s Central Bank.

B.  

 Classification based on currencies and interest rates  

Current liabilities (without current maturities)

Short-term loans from financial institutions
In dollars
In other currencies

Non-current liabilities (including current maturities)

Debentures
In dollars
In other currencies

Loans from financial institutions (including financing lease)
In dollars
In shekels
In quetzales
In other currencies

Weighted-
average interest
rate December 31 
2016
%

As at December 31

2016

2015

$ thousands

5.61% 
5.23% 

6.54% 
5.37% 

5.87% 
5.35% 
7.29% 
6.25% 

208,418 
4,999 
213,417 

172,234 
7,083 
179,317 

804,052 
63,235 
867,287 

1,467,369 
416,710 
89,464 
17,948 
1,991,491 

2,858,778 

629,014 
42,233 
671,247 

1,043,289 
490,645 
— 
16,546 
1,550,480 

2,221,727 

C.

Liability in respect of financing lease

  Information regarding the financing lease liability broken down by payment dates is presented below:

As at December 31, 2016

As at December 31, 2015

Minimum future
lease rentals

Interest
component

Present value of
minimum lease
rentals

Minimum future
lease rentals

Interest
component

Present value of
minimum lease
rentals

Less than one year
From one year to five years
More than five years

13,016 
85,849 
15,207 
114,072 

6,040 
19,217 
646 
25,903 

F - 77

$ thousands

6,976 
66,632 
14,561 
88,169 

35,501 
134,976 
31,454 
201,931 

9,772 
26,053 
2,332 
38,157 

25,729 
108,923 
29,122 
163,774 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

Short-term loans from banks

D. Credit Suisse — On December 29, 2015, I.C. Power Distribution Holdings Pte. Ltd., together with certain of its subsidiaries, executed a one-year secured credit agreement with Credit Suisse AG in
an aggregate principal amount of $120 million to finance a portion of the acquisition of Estrella Cooperatief B.A. The loan under this facility bears interest on a quarterly basis at LIBOR plus a
margin of 4% per annum and was secured with the shares of Estrella Cooperatief B.A. For additional information see Note 11.A.1.a. On December 21, 2016, I.C. Power Distribution extended the
maturity date of this loan to June 29, 2017.

As of December 31, 2016, the outstanding principal amount under this facility was $120 million. ($117 million as of December 31, 2015).

Long term loans from banks and others 

E. In August 2012, CDA, as borrower, Sumitomo Mitsui Banking Corporation, as administrative agent, Sumitomo Mitsui Banking Corporation, as SACE agent, the Bank of Nova Scotia, as Offshore
Collateral Agent, Scotiabank Perú, S.A.A., as onshore collateral agent, and certain financial institutions, as lenders, entered into a senior secured syndicated credit facility for an aggregate principal
amount not to exceed $591 million to finance the construction of CDA’s project. Loans under this facility will be disbursed in three tranches.

The loans under this credit agreement are secured by CDA’s power plant and related assets, comprise three tranches and bear interest payable on quarterly basis in arrears at a rate of LIBOR plus a
margin. The margin applicable to each tranche is as follows: 

Tranche
  A 
  B 
  D 

* Up to

Amount*
($)

From July 2014
to August 2017

From August 2017  

From August 2020  

From August 2023  

to August 2020

to August 2023

to maturity

341,843 
184,070 
65,000 

4.25%  
4.25%  
2.75%  

4.75%  
5.00%  
3.25%  

5.25%  
5.75%  
3.60%  

5.50%
6.25%
3.60%

Tranche A loans under this facility, in an aggregate principal amount of up to $342 million, will initially bear interest at the rate of LIBOR plus 4.25% per annum, increasing over time beginning on
the  date  after  the  interest  payment  date  occurring  after  August  17,  2017  to  LIBOR  plus  5.50%  per  annum  from  the  date  after  the  interest  payment  date  occurring  after  August  17,  2023  through
maturity. Principal of the Tranche A loans will be payable in 33 quarterly installments commencing on the first quarterly payment date occurring after the project acceptance by CDA. Tranche A
loans will be guaranteed by Corporación Financiera de Desarollo S.A. (COFIDE).

Tranche B loans under this facility, in an aggregate principal amount of up to $184 million, will initially bear interest at the rate of LIBOR plus 4.25% per annum, increasing over time beginning on
the  date  after  the  interest  payment  date  occurring  after  August  17,  2017  to  LIBOR  plus  6.25%  per  annum  from  the  date  after  the  interest  payment  date  occurring  after  August  17,  2023  through
maturity. Principal of the Tranche B loans are payable on August 17, 2024. Tranche B loans are guaranteed by COFIDE.

F - 78

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

Tranche D loans under this facility, in an aggregate principal amount of up to $65 million, are divided in two parts: Tranche 1D, in an aggregate principal amount of up to $42 million and Tranche
2D, in an aggregate principal amount of up to $23 million. Both parts will initially bear interest at the rate of LIBOR plus 2.75% per annum, increasing over time beginning on the date the interest
payment date occurring after August 17, 2017 to LIBOR plus 3.60% per annum from the date after the interest payment date occurring after August 17, 2023 through maturity. Principal of Tranche
1D and Tranche 2D will be payable in 33 and 12 quarterly installments, respectively. Tranche 1D payments will commence on the first quarterly payment date occurring after the project acceptance
by CDA and Tranche 2D payments will commence 33 quarters after project acceptance by CDA. All Tranche D loans are secured by a credit insurance policy provided by SACE S.p.A. – Servizi
Assicurativi del Commercio Estero, or SACE.

On August 17, 2013 CDA entered into interest rate swap closings: 100% of Tranche A was swapped at a fixed all-in interest rate of 7.2450% until August 2024 and 50% of Tranche B was swapped
at a fixed all-in interest rate of 5.3777% until February 2016.

As  of  December  31,  2016,  CDA  has  received  proceeds  from  these  facilities  in  the  aggregate  amount  of  $591  million  ($44  million,  $85  million  and  $319  million  during  2016,  2015  and  2014
respectively). The outstanding balance under this Syndicated loan was $587 million. This amount is shown net of $8 million of transaction costs.

F In December 2014, Samay I S.A. signed a project finance credit agreement with: The Bank of Tokyo-Mitsubishi, Sumitomo Mitsui Banking Corporation and HSBC Bank in order to finance $311
million, approximately 82% of the total cost of the project. This loan will initially bear interest at the rate of LIBOR plus 2.125% per annum, increasing to LIBOR plus 2.375% in December 2017 and
to LIBOR plus 2.625% in December 2020 through maturity in December 2021. On December 18, 2014 Samay entered into an interest rate swap closing at a fixed all-in interest rate of 2.919% (Libor
at 0.794 plus 2.125%) for 40% of total notional and only during the construction period. On September 16, 2015 Samay entered into an interest rate swap closing at a fixed all-in interest rate of
4.2343% for 93% of total notional beginning after the construction period. Samay has received proceeds from this facility in the aggregate amount of $ million311 million ($20 million, $138 million
and $153 million, during 2016, 2015 and 2014, respectively). This amount is shown net of $4 million of transaction costs.

G. In  relation  to  Inkia´s  acquisition  of  Central  Cardones  in  December  2011,  Inkia  consolidated  the  amounts  outstanding  under  Central  Cardones’  credit  agreement  entered  with  Banco  de  Crédito  e
Inversiones and Banco Itaú Chile. The loans under this credit agreement were issued in two tranches of $38 million and $21 million, respectively. Loans under the first tranche bear interest at the rate
of LIBOR plus 1.9% per annum, and the principal of this tranche is payable in 20 semi-annual installments through maturity in August 2021. Interest rate under these loans is swapped at an all-in rate
of 6.80%. Loans under the second tranche bear interest semi-annually at the rate of LIBOR plus 2.75% per annum, increasing to LIBOR plus 3.75% per annum in March 2017, and the loan matures
in August 2021. As of December 31, 2016, the outstanding principal amount under these loans was $35 million ($43 million as of December 31, 2015).

H. In January 2014, Colmito Spa signed a credit agreement with Banco Bice in an aggregate amount of Chilean pesos 12,579 million ($23 million). This loan bears an interest rate of 7.9% in Chilean
pesos and is paid semiannually until final maturity in December 2028. In February 2014 Colmito entered into a cross currency swap closing at a fixed interest rate of 6.025% in U.S. Dollars. As of
December 31, 2016, the outstanding balance under this loan was $17 million ($16 million as of December 31, 2015).

I. Consorcio Eolico Amayo S.A. – In October 2007, Amayo I entered into a 15 year $71 million loan agreement with Banco Centroamericano de Integración Economica (CABEI). This loan is secured
by a first degree mortgage over all the improvements executed on Amayo I´s project site, cessation of all the project contracts and the creation and maintenance of a reserve account for $2 million, to
be controlled by CABEI. Part of this loan ($50 million) bears an interest rate of 8.45% and the other part ($21 million) an interest rate of LIBOR+4%, and is payable in quarterly installments until
final maturity in February 2023. As of December 31, 2016, the outstanding balance under this loan was $43 million ($47 million as of December 31, 2015).

F - 79

 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

J. Consorcio Eolico Amayo (Fase II) S.A. – In November 2010, Amayo II entered into a 15 year $45 million loan agreement with Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden
N.V (FMO) Banco Centroamericano de Integración Economica (CABEI). This syndicated loan is secured by a list of guarantees. Loans under this credit agreement bear interest rates of 10.76%,
8.53% and LIBOR+5.75%. Loans with variable interest rate are swapped at an all-in rate of 8.31% until December 2019 and 8.25% from December 2019 until September 2022. All three loans are
payable in quarterly installments until final maturity in September 2025. As of December 31, 2016, the outstanding balance under this loan was $31 million ($34 million as of December 31, 2015).

K. Puerto Quetzal Power LLC – In March 2012, Puerto Quetzal Power LLC (“PQP”) signed a loan agreement with seven financial institutions for an amount of $35.0 million. The loan is payable in
quarterly installments until September 2019. Interest is accrued at LIBOR plus 4.5% annually. PQP entered into an interest rate swap contract to fix its interest at a rate of 6.0% per annum. The loan
is secured by a pledge of substantially all of the assets of PQP and Poliwatt Ltd (“Poliwatt”), including PQP and its subsidiaries shares. As of December 31, 2016, the outstanding balance under this
loan was nil ($15 million as of December 31, 2015).

On November 17, 2016, PQP signed a loan agreement with Banco Industrial in an aggregate principal amount of $12 million. The loan is payable in quarterly installments until final maturity in
December 31, 2021. Interest is accrued at LIBOR plus 4.50% per annum, with a floor of 1.50%. The loan is secured by an escrow account that consists of all PQP assets. As of December 31, 2016 the
outstanding principal amount under this loan was $12 million, net of transaction costs.

L. On January  15, 2016, Kanan Overseas  I  received  a 60-  day  bridge  loan  in  the aggregate  amount  of  $61 million  from  Bank of  Nova Scotia,  as  part  of  the three  Credit  Facilities  approved.  These
proceeds were used to repay $50 million of an intercompany loan with Inkia Energy Ltd.; reimburse costs and expenses incurred in the project; and purchase fuel, raw material and other expenses.
The original expiration of this loan was extended up to May 31, 2016.

On May 23, 2016 this loan was replaced by a $55 million 5-year credit facility and by a $6 million short term loan. The credit facility bears interest on a quarterly basis at Libor 3-Months plus a
margin of 3.00% with a floor of 3.5%. Scheduled amortizations of principal are payable quarterly commencing in June 2016 through maturity in March 2021. The loans are guaranteed by all of
Kanan’s assets. As of December 31, 2016 the outstanding balance under this loan was $46 million.

M. Overseas Facility — On May 9, 2016, Overseas Investments Peru S.A., a 100% whole-owned subsidiary of the Group signed a $100 million Credit Facility with Credit Suisse AG. The proceeds from
this facility were fully drawn on August 31, 2016. This facility with final maturity on November 9, 2017 bears an interest rate of 90-day Libor plus 5.00% (from the funding date to the 6-month
anniversary of the funding date); 90-day Libor plus 5.75% (from one day after the 6-month anniversary to the 12-month anniversary of the funding date); and 90-day Libor plus 6.50% thereafter. As
of December 31, 2016, the outstanding principal amount under this facility was $100 million. ($97 million, net of transaction costs).

N. Kallpa Syndicated Loan - In November 2009, Kallpa entered into a secured credit agreement in the aggregate amount of $105 million to finance capital expenditures related to Kallpa’s combined-
cycle plant. The loans under this credit agreement are secured by Kallpa’s combined-cycle plant substantially all of Kallpa’s other assets, including Kallpa’s revenues under its PPAs. The loan under
this  credit  agreement  bears  interest  payable  monthly  in  arrears  at  a  rate  of  LIBOR plus  a  margin  of  5.50% per  annum  through November  2012, 5.75%  per  annum  from  November  2012 through
November 2015 and 6.00% from November 2015 through maturity in October 2019. Scheduled amortizations of principal are payable monthly commencing in February 2013 through maturity in
October 2019. As of December 31, 2015, the outstanding balance under this credit agreement was $59 million. As a result of the Kallpa’s issuance of its $350 million, 4.875% senior unsecured notes
executed in May 2016, Kallpa repaid the $54 million outstanding under the syndicated loan in full.

O. DEORSA  -  In  May  2011,  DEORSA  entered  into  a  $41  million  (approximately  Q.314  million)  and  $90  million,  10-year  syndicated  secured  loan  agreement  with  a  syndicate  including  Banco
Agromercantil de Guatemala, S.A., as the manager of the guarantee and administrative agent, and certain financial institutions, to refinance DEORSA’s existing indebtedness as of the closing date of
the acquisition, and to finance DEORSA’s working capital requirements. The U.S. Dollar denominated loans under this agreement bear interest at a fixed rate of 6.00% for the first two years and at a
rate of 90-day US LIBOR plus 4.70% per annum through maturity on May 19, 2021. Guatemalan Quetzales denominated loans under this agreement bear interest at a variable interest rate calculated
by the weighted average rate (TASA Activa Promedio Ponderada), or TAPP rate, less 5.6%, per annum. Scheduled amortizations of the aggregate principal amount outstanding under this agreement
(generally 2.81%) are payable in quarterly installments through maturity.

F - 80

 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

In April 2015, the loan agreement was amended and the amounts available under the facility were increased by approximately $37 million (Q.70 million) and $21 million to fund, among other things,
DEORSA’s operating and investment activities, repayment of certain outstanding indebtedness, and general corporate purposes. The U.S. Dollar-denominated loans under the additional facility bear
interest at a rate of 90-day US LIBOR plus 4.70% per annum (with a floor rate of 5.90%) for the first year and at a rate of 90-day US LIBOR plus 4.75% per annum (with a floor rate of 6.0%)
through maturity on February 19, 2025. Guatemalan Quetzales-denominated loans under the additional facility bears interest at a variable interest rate calculated by the weighted average rate (TASA
Activa  Promedio  Ponderada),  less  6.10%,  per  annum.  Scheduled  amortizations  of  the  aggregate  principal  amount  outstanding  under  the  additional  facility  are  payable  in  quarterly  installments
commencing in May 2018 through maturity.

In August 2016, DEORSA amended the loan agreement to renew the two tranches that expired. The amounts available under the facility were increased by approximately $5 million (Q.37 million)
and $11 million. The U.S. Dollar-denominated loan under the additional facility bears interest at a rate of LIBOR + 4.75% (with a floor rate of 6.00%). The Guatemalan Quetzales-denominated loan
under  the  additional  facility  bears  interest  at  a rate  of  the  TAPP rate  less  6.10%.  Scheduled  amortizations  of  the  aggregate  principal  amount  under  the  additional  facility  are  payable  in  quarterly
instalments commencing in May 2018 through maturity in February 2025.

As of December 31, 2016, the outstanding balance under this loan was $113 million.

P. DEOCSA  -  In  May  2011,  DEOCSA  entered  into  a  approximately  $54  million  (Q.416  million)  and  $150  million,  10-year  syndicated  secured  loan  agreement  with  a  syndicate  including  Banco
Agromercantil  de  Guatemala,  S.A.,  as  the  manager  of  the  guarantee  and  administrative  agent,  and  certain  financial  institutions,  as  lenders,  and  other  parties  thereto,  to  finance  the  acquisition  of
DEOCSA by its previous owner, to refinance DEOCSA’s existing indebtedness as of the closing date of the acquisition, and to finance DEOCSA’s working capital requirements. The U.S. Dollar
denominated loans under this agreement bear interest at a fixed rate of 6.00% for the first two years and at a rate of 90-day U.S. LIBOR plus 4.70% per annum through maturity on May 19, 2021.
Guatemalan Quetzales denominated loans under this agreement bear interest at a variable interest rate calculated by the TAPP rate, as published by the Guatemalan Central Bank for the most recent
date  as  of  the  first  day  of  the  relevant  interest  period,  less  5.6%,  per  annum.  Scheduled  amortizations  of  the  aggregate  principal  amount  outstanding  under  this  agreement  (generally  2.81%)  are
payable in quarterly installments through maturity.

In April 2015, the loan agreement was amended and restated and, in accordance therewith, the amounts available under the facility were increased by approximately $51 million (Q.105 million) and
$32  million  to  fund,  among  other  things,  DEOCSA’s  operating  and  investment  activities,  repayment  of  certain  outstanding  indebtedness,  and  general  corporate  purposes.  The  U.S.  Dollar-
denominated loans under the additional facility bears interest at a rate of 90-day US LIBOR plus 4.70% per annum (with a floor rate of 5.90%) for the first year and at a rate of 90-day US LIBOR
plus 4.75% per annum (with a floor rate of 6.0%) through maturity on February 19, 2025. Guatemalan Quetzales-denominated loans under the additional facility bear interest at a variable interest rate
calculated by the weighted average rate (TASA Activa Promedio Ponderada), as published by the Guatemalan Central Bank) for the most recent date as of the first day of the relevant interest period,
less 6.10%, per annum. Scheduled amortizations of the aggregate principal amount outstanding under the additional facility are payable in quarterly installments commencing in May 2018 through
maturity.

In August 2016, DEOCSA entered into an addendum to the loan agreement, which renewed two tranches under the loan agreement which had expired. The amounts available under the facility were
increased by approximately $7 million (Q.56 million) and $17 million. The U.S. Dollar-denominated loan under the additional facility bears interest at a rate of LIBOR + 4.75% (with a floor rate of
6.00%). The Guatemalan Quetzales-denominated loan under the additional facility bears interest at a rate of the TAPP rate less 6.10%. Scheduled amortizations of the aggregate principal amount
under the additional facility are payable in quarterly instalments commencing in May 2018 through maturity in February 2025.

As of December 31, 2016, the outstanding balance under this loan was $174 million.

Q. RECSA – In November 2013, RECSA entered into a approximately $4 million (Q.35 million) credit agreement with Banco G&T Continental. The loan is payable in semiannual installments until

November 2020. Interest is accrued at TAPP rate less 6.63% per annum. As of December 31, 2016, the outstanding balance under this loan was $5 million.

F - 81

 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

R. OPC Lenders Consortium - In January 2011, OPC entered into a financing agreement with a consortium of lenders led by Bank Leumi L’Israel Ltd (“Bank Leumi”) (shareholder of Kenon - 14%
shareholding) for the financing of its power plant project. The financing consortium includes Bank Leumi and institutional entities from the following groups: Clal Insurance Company Ltd.; Amitim
Senior Pension Funds; Phoenix Insurance Company Ltd.; and Harel Insurance Company Ltd (“OPC’s lenders”). As part of the financing agreement, the lenders committed to provide OPC a long-
term credit facility (including a facility for variances in the construction costs), a working capital facility, and a facility for financing the debt service, in the overall amount of approximately NIS
1,800 million (approximately $460 million). The loans are CPI linked and are repaid on a quarterly basis beginning in the fourth quarter of 2013 until 2031. As part of the financing agreement, OPC
had certain restrictions to make distributions of dividends and repayments of shareholders’ loans, only after the third year after the completion of OPC’s power plant. On October 13, 2015, OPC and
the senior lenders amended the Facility Agreement to remove this restriction.

As part of the Facility Agreement, OPC is required to keep a Debt Service Reserve equivalent to the following two quarterly debt payments (hereinafter- “the reserve”) within the period of two years
following power plant construction completion. As of December 31, 2016 the amount of the reserve is NIS73 million (equivalent to $19 million).

As of December 31, 2016 and 2015, the outstanding balance under this facility was NIS1,402 million ($365 million) and NIS1,469 million ($377 million), respectively.

S. Veridis— It corresponds to equity contributions made by Veolia Energy Israel Ltd. (“Veridis”) (previously Veolia Energy Israel Ltd ) (OPC´s minority shareholder) and presented as a capital note

On October 19, 2015, OPC paid to its shareholders in the amount of NIS223 million (approximately $58 million) as repayment of these capital notes, of which NIS59  million(approximately $15
million) were paid to Veolia Energy Israel Ltd.

As of December 31, 2016, OPC has settled the balance of the capital notes to Veridis.

T. I.C. Power Israel Ltd. —On June 22, 2014, ICPI entered into a mezzanine financing agreement with Mivtachim Social Insurance and Makefet Fund Pension (“Amitim Pension Funds”) and Menora
Mivtachim Insurance Ltd in the aggregate amount of NIS350 million ($93 million), consisting of three Facilities: (i) Tranche A bridge loan for NIS150 million, bearing interest of 4.85% p.a. to be
repaid until March 31, 2017; (ii) Tranche B long-term loan for NIS200 million, bearing interest of 7.75% p.a., repayable on annual basis until March 2029; and (iii) Tranche C (only to cover shortfall
amounts) for NIS350 million. As of December 31, 2016, no disbursements have been made under Tranche C. These loans are linked to CPI.

During January 2016, Tranche A was prepaid for a total of NIS162 million (approximately $41 million).

As of December 31, 2016 and 2015, the outstanding balance under this facility was NIS199 million ($2 million) and NIS377 million ($97 million), respectively.

U. AIE Financing— In July 2016, AIE entered into a NIS1,006 million (approximately $261 million) loan agreement with Israel Discount Bank and Harel Insurance Group to finance the construction of
AIE’s power plant in Hadera. The financing will mature 18 years after the completion of the construction period, and includes a term loan facility, a standby facility, a debt service reserve amount, or
DRSA, facility to finance the DSRA deposit, a guarantee facility to facilitate the issuance of bank guarantees to be issued to third parties, a VAT facility (for the construction period only), a hedging
facility (for the construction period only), and a working capital facility (for the operation period only). The term loan, standby, DSRA, and hedging facilities shall each bear interest at a rate of 2/3
Government CPI-linked Bond + 2.95% + 1/3 Government Bond + 2.95% per annum. The guarantees, VAT and working capital facilities shall each bear interest at a rate of the prime interest rate +
1.5% per annum. These terms are subject to AIE’s credit rating. As of December 31, 2016, AIE had not made drawings under this loan agreement.

F - 82

 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

Liabilities in respect of finance leases

V. Citibank Perú and Banco de Crédito del Perú - In March 2006, Kallpa entered into a capital lease agreement with Citibank del Perú S.A., Citileasing S,A. and Banco de Crédito del Perú under which
the lessors provided financing for the construction of the Kallpa I facility at Chilca in an aggregate amount of $56 million. Under the lease agreements, Kallpa made monthly payments beginning in
December 2007 until the expiry of the lease in March 2016. These leases were secured by the assets of Kallpa in Peru. The lease bore an interest rate of 90 day LIBOR plus 3.00%. In March 2016,
upon expiration of these leases, Kallpa executed its option to purchase the property related to the Kallpa I plant for a nominal cost ($2 million as at December 31, 2015).

W. Banco de Crédito del Perú - In December 2007, Kallpa entered into a capital lease agreement with Banco de Crédito del Perú under which the lessor provided financing for the construction of the
Kallpa II turbine in an aggregate amount of $82 million. Under the lease agreement, Kallpa made monthly payments beginning in December 2009 until the repayment of the lease (May 2016). These
leases were secured by the assets of Kallpa in Peru. The lease bore an interest rate of 90 day LIBOR plus 2.05%. Kallpa entered into an interest rate swap to fix the interest rate at an all-in rate of
6.55%, see Note 17.A.a.

In  relation  to  Kallpa’s  issuance  of  its  $350  million,  4.875%  senior  unsecured  notes  due  May  2016,  Kallpa  repaid  the  $27  million  outstanding  under  this  lease  in  full  in  2016  ($29  million  as  at
December 31, 2015).

X. Scotiabank  -  In  October  2008,  Kallpa  entered  into  a  capital  lease  agreement  with  Scotiabank  Perú  under  which  the  lessor  provided  financing  for  the  construction  of  the  Kallpa  III  turbine  in  an
aggregate amount of $88 million. Under the lease agreement, Kallpa made monthly payments beginning in September 2010 until the repayment of the lease (May 2016). As of December 31, 2015,
the aggregate outstanding principal amount under this lease was $38 million and bore a fixed interest rate of 7.57% p.a.

In relation to Kallpa’s issuance of its $350 million, 4.875% senior unsecured notes due May 2016, Kallpa repaid the $35 million outstanding under this lease in full in 2016.

Y. In April 2014, Kallpa entered into a capital lease agreement with Banco de Crédito del Perú for $108 million in order to finance the acquisition of the 193MW single turbine natural gas fired plant
Las Flores from Duke Energy. Under the lease agreement, Kallpa makes quarterly payments beginning in July 2014 until the expiry of the lease in October 2023. The lease bears a fixed interest rate
of 7.15% p.a. As of December 31, 2016, the aggregate outstanding principal amount under this lease was $88 million ($94 million as of December 31, 2015).

F - 83

 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

Debentures

Z. Bonds Cobee III - In February 2010, COBEE approved a bond program under which it is permitted to offer bonds in aggregate principal amounts of up to $40 million in multiple series. On March

12, 2010, COBEE issued and sold in the Bolivian market three series of notes in the aggregate principal amount of $14 million.

The aggregate gross proceeds of these notes, which were issued at a premium, were $17 million. The Series A Notes, in the aggregate principal amount of $4 million pay interest semi-annually at
the rate of 5.00% per annum through maturity in February 2014. Principal on these notes is payable at maturity. The Series B Notes, in the aggregate principal amount of $4 million, pay interest
semi-annually at the rate of 6.50% per annum through maturity in February 2017. Principal on these notes will be paid in two equal annual installments commencing in February 2016. The Series C
Notes, in the principal amount of Bs.44.2 million ($6 million), pay interest semi-annually at the rate of 9.00% per annum through maturity in January 2020. Principal on these notes will be paid in
four equal annual installments commencing in February 2017.

In April 2012, COBEE issued and sold two additional series of notes in the aggregate principal amount of $11 million. The aggregate gross proceeds of these notes, which were issued at premium,
were $13 million. COBEE will amortize the premium reducing the interest expense related to these notes. The first series of these notes, in the aggregate of $5 million pays interest semi-annually at
the rate of 6.75% per annum through final maturity in April 2017. Principal on these notes is payable at maturity. The second series of these notes in the aggregate principal amount of Bs.43 million
($6 million), pays interest semi-annually at the rate of 7% per annum through maturity in February 2022. These funds were used mainly to pay a tranche of Bolivian bonds due in June 2012.

AA. Bonds Cobee IV - In May 2013, COBEE approved a bond program under which COBEE is permitted to offer bonds in aggregate principal amount of up to $60 million in multiple series. In

February 2014, COBEE issued and sold three series of notes in the aggregate principal amount of $20 million. The aggregate gross proceeds of these notes, which were issued at a premium, were
$21 million. The Series A Notes, in the aggregate principal amount of $4 million pay interest semi-annually at the rate of 6.0% per annum through maturity in January 2018. The Series B Notes, in
the aggregate principal amount of $4 million pay interest semi-annually at the rate of 7.0% per annum through final maturity in January 2020. The Series C Notes, in the aggregate principal amount
of Bs.84 million ($12 million) pay interest semi-annually at the rate of 7.8% per annum through maturity in January 2024.

In November 2014, COBEE issued and sold two series of notes in the aggregate principal amount of $21 million. The aggregate gross proceeds of these notes, which were issued at a premium, were
$22,100. The first series of these Notes, in the aggregate principal amount of $5 million pay interest semi-annually at the rate of 6.70% per annum through maturity in October 2019. The second
series of these notes in the aggregate principal amount of Bs.105 million ($15 million) pay interest semi-annually at the rate of 7.80% per annum through maturity in October 2024.

In October 2016, COBEE issued and sold the last series of notes approved under the bond program in the aggregate principal amount of Bs.138 million ($20 million). The aggregate gross proceeds
of the notes, which were issued at a premium, were Bs.152 million ($21,740). These Notes pay interest semi-annually at the rate of 5.75% per annum through maturity in August 2026.

BB. Inkia Bonds - On April 4, 2011, Inkia issued senior unsecured notes for an aggregate principal amount of $300 million in the international capital market under the rule 144A Regulation S. These

notes accrue interest at a rate of 8.375% and will be payable semi-annually with final maturity in April 2021 and were recognized initially at fair value plus any directly attributable transaction costs.
The proceeds from this issue were used mainly to finance Inkia’s equity contribution in the construction of Cerro del Aguila Project and to repurchase all of the Inkia Bonds.

On September 9, 2013, Inkia reopened its 8.375% senior notes due 2021 for an aggregate principal amount of $150 million. The new notes have terms and conditions identical to the initial $300
million notes issued on April 4, 2011 and were issued at 104.75% plus accrued interest from April 4, 2013, resulting in gross proceeds of $157 million plus $6 million of accrued interest. The
proceeds from this issue will be used mainly for working capital and general corporate purposes. Subsequent to initial recognition, these notes are measured at amortized cost using the effective
interest method. As of December 31, 2016, the outstanding principal amount under these notes was $448 million ($448 million as of December 31, 2015).

On September 5, 2014, Inkia requested the consents to its bondholders regarding certain proposed amendments to the Indenture: (i) Perform the IC split without being required to repurchase the
bonds at a price equal to 101% of the aggregate principal; (ii) Request the repayment of the $150 million Credit Suisse/I.C. Power/Inkia Loan from the net proceeds of the Edegel sale; and (iii)
Extend the investment period of the net proceeds from the Edegel sale from 12 to 30 months.

F - 84

 
 
 
 
 
 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

On September 16, 2014, Inkia received the consents from holders of a majority of its outstanding $450 million Senior Notes due 2021 and paid $1 million in fees related to obtain these consents.

CC. Kallpa Bonds due 2022 - In November 2009, Kallpa issued $172 million aggregate principal amount of its 8.5% Bonds due 2022. Holders of these bonds are required to make subscription payments

under a defined payment schedule during the 21 months following the date of issue. The proceeds of these bonds were used for capital expenditures related to Kallpa’s combined-cycle plant.
Interest on these bonds accrues based on the principal received by Kallpa and is payable quarterly. Principal amortization payments under these bonds in amounts varying between 0.25% and 5.00%
of the outstanding principal amount of these bonds commenced in May 2014 and will continue until maturity in May 2022. These bonds are secured by Kallpa’s combined-cycle plant and related
assets. As of December 31, 2015, the aggregate outstanding principal amount of these bonds was $149,105.

In relation to Kallpa’s issuance of its $350 million, 4.875% senior unsecured notes due May 2016, Kallpa repaid the outstanding amounts under the bonds in 2016 ($143 million as at December 31,
2015).

DD. Kallpa Bonds due 2026 - In May 2016, senior notes for an aggregate principal amount of $350 million in the international capital market under the rule 144A Regulation S. The notes were issued
under-par (99.258%) and interest accrues biannually in May and November of each year at a rate of 4.875%. Principal will be fully paid at maturity. The net proceeds from this issue in the amount
of $347 million were used to repay in full the outstanding balance of: (i) the finance lease agreements (Kallpa II and Kallpa III); (ii) the Kallpa bonds due 2022, (iii) the syndicated loan and (iv) the
$45 million short-term loans. The remainder of the proceeds were used for general corporate purposes. As a result of the redemption premium paid in respect of the Kallpa bonds due 2022 that
qualified as a debt extinguishment, Kallpa recorded a $10 million finance expense. As of December 31, 2016, the outstanding amount of these notes was $326 million (net of transaction costs).

EE. In December 2010, CEPP approved a program bond offering under which CEPP is permitted to offer bonds in aggregate principal amount of up to $25 million in multiple series. In 2011 and 2010,

CEPP issued and sold $20 million and $5 million of its 7.75% Bonds. CEPP used the proceeds of this offering to finance its continuing operations and repay intercompany debt. Interest on these
bonds is payable monthly and principal of these bonds is due at maturity in May 2014. During the first quarter of 2014, CEPP issued and sold $25 million of its 6.00% Bonds due in January and
March 2019. Part of these funds was used to prepay $15 million of its 7.75% Bonds outstanding due in May 2014. In October 2015, $15 million in CEPP’s bonds were repurchased. As of
December 31, 2016, the outstanding principal amount net of transaction costs under these notes was $10 million ($10 million as of December 31, 2015).

F - 85

 
 
 
 
 
 
 
Note 15 – Loans and Debentures (Cont’d)

FF.

As at December 31, 2016 and 2015, the main covenants that the Group and certain Group entities must comply with during the term of the debts are as follows:

Group entities
Kallpa Generación S.A.
Samay
CDA
COBEE (Bonds)
Cardones (Chile)
Colmito (Chile)
JPPC (Jamaica)
Amayo I (Nicaragua)
Amayo II (Nicaragua)
Corinto (Nicaragua)
Tipitapa (Nicaragua)
CEPP (Dominican Republic)
Energuate (Guatemala)
Nejapa (El Salvador)
Kanan (Panama)
OPC

Shareholder
equity

Debt service
to coverage ratio

Collateral ratio

Maximum leverage

Interest rate
hedging

Covenant

  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not less than $21 million

  >   $40 million
  Not required
  Not required

  Not less than 1.20
  Not less than 1.64
  Not less than 1.20
  Not less than 1.20
  Not less than 1.10
  Not less than 1.15
  Not less than 1.10
  Not less than 1.25
  Not less than 1.20
  Not required
  Not required
  Not less than 2.50
  Not less than 1.30
  > 1.50
  Not less than 1.25
  Not less than 1.25

Not required
Not required
Not required
Not required
Not required
Not required
Not required
Not required
Not required
Not required
Not required
Not required

Not required
Not required
Not required

  No more than 3.0
  Not required
  Not required
  Debt to capital no more than 1.2
  Not required
  Not required
  Debt to capital no more than 40%
  Not required

  Required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
Financial debt to Net Worth not in excess of 70:30   Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required
  Not required

  Maximum debt to EBITDA of 2.5
  Maximum debt to EBITDA of 2.75.
  Maximum debt to EBITDA of 3.5
  Maximum debt to EBITDA of 3.5

  Maximum debt to EBITDA of 3.5
  Not required

< 3.0

Other than with respect to the covenants referred to above, and the restrictions set forth in Note 20, there are no significant restrictions on the ability of the Group’s subsidiaries to repay loans or
advances or to transfer funds to the Group. 

Compliance with the covenants referred to above is overseen by the Group’s Management. As of December 31, 2016, Kanan (Panama) does not comply with their debt service to coverage ratio and
maximum leverage and Kanan holds a waiver but dated January 2017, therefore, its financial debt has been classified as current liability. Corinto (Nicaragua) does not comply with the debt service to
coverage ratio, but Corinto holds a waiver from Banco de America Central thus not requiring to classify its debt as current liability. JPPC holds a waiver from Sagicor Bank signed in June 2016 up to
December 2016 and complies with its debt service to coverage ratio and maximum leverage, therefore, it is not required to reclassify its debt as current liability.

Note: Inkia has to comply only with incurrence ratios when it plans to issue new debt.

Note 16 – Trade Payables

Current
Trade Payables
Other Payables

Non-current
Trade Payables*

As at December 31

2016

2015

$ thousands

285,409     
203     
285,612     

145,443 
11 
145,454 

44,057     

— 

(*)  As  of  December  31,  2016,  non-current  trade  payables  correspond  mainly  to  spare  parts,  used  for  major  maintenance  of  Kallpa  facilities,  acquired  according  to  a  long-term  program  (LTP)
agreement signed with Siemens. During 2016, these trade payables have not generated interests and no specific guarantee have been granted.

F - 86

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
   
     
 
   
   
 
   
   
      
  
   
 
 
Note 17 – Other Payables including Derivative Instruments

Current liabilities:
Financial derivatives not used for hedging (a)
Financial derivatives used for hedging (a)
The State of Israel and government agencies
Employees and payroll-related agencies
Customer advances and deferred income
Accrued expenses
Dividend payable to non-controlling interest
Interest payable
Other (b)

Non-current liabilities:
Financial derivatives not used for hedging (a)
Financial derivatives used for hedging (a)
Other financial derivatives (see note 10.C.b.5)

a.

As of December 31, 2016 and 2015, the derivatives maintained by the Group are as follow:

Hedge derivatives (i)
Interest rate swap (a)
Interest rate swap (b)
Interest rate swap (c)
Interest rate swap (d)
Exchange rate swap (e)

Exchange rate swap (f)

Trading derivatives (ii)
Interest rate swap (f)
Interest rate swap (g)
Interest rate swap (h)

As at December 31

2016

2015

$ thousands

783 
11,563 
4,206 
4,846 
944 
23,563 
2,893 
23,038 
19,467 
91,303 

1,342 
13,701 
29,594 
44,637 

1,080 
11,480 
4,504 
4,229 
1,483 
10,819 
— 
22,307 
52,971 
108,873 

2,196 
33,429 
— 
35,625 

Notional
  amount

Fair value
2016
$ thousands

2015

384,093 
100,683 
124,400 
15,553 

158,270 
58,604 

42,000 
14,500 
8,443 

(17,509)
— 
(2,955)
(2,401)

— 
(2,399)
(25,264)

(1,950)
— 
(175)
(2,125)

(30,979)
(196)
(9,004)
(3,880)

(850)
— 
(44,909)

(2,994)
(7)
(275)
(3,276)

(i) Hedge derivatives

Entity

Financing

Underlying 
item

(a)
(b)
(c)
(d)
(e)

CDA
CDA
Samay I
Colmito
CDA

Syndicated
Syndicated
Syndicated
Loan
EPC payments in Nuevos Soles

Libor plus 4.25%
Libor plus 4.25%
Libor plus 2.125%
7.90% in Chilean Pesos
Spot exchange rate in Nuevos Soles

F - 87

Description
100% - Tranche A
50% - Tranche B
93% total debt
69% total debt
S/.403 million

Fixed rate
7.25-8.50%
5.38%
4.23%
6.025% in $
S/. 2.546 for each $1

Expiration

Aug 2024
Feb 2016
Dec 2021
Jun 2028
Jan 2016

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
     
 
 
 
   
   
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
 
  
 
 
Note 17 – Other Payables including Derivatives (Cont’d)

Entity

(f)

AIE

Financing
EPC payments in EUR
EPC payments in USD

Underlying item

Spot exchange rate in NIS
Spot exchange rate in NIS

Description

EUR 53 million
EUR 3 million

Fixed rate

Average of NIS 4.24 for each EUR 1
NIS 3.841 for each $ 1

Expiration
Jan 2017-Nov 2018
May-Aug 2017

 (ii) The Group has three additional interest swap agreements that are accounted for as trading derivatives because these derivatives were already in place when Inkia took control of the subsidiaries:

Entity

Financing

Underlying item

(f)
(g)
(h)

Cardones
JPPC
Amayo II
Amayo II

Syndicated
Loan
Syndicated
Syndicated

Libor plus 1.9%
Libor plus 5.5%
Libor plus 5.75%
Libor plus 5.75%

Description
100% - Tranche I
71%
84% - BCIE facility
49% - BCIE facility

Fixed rate
6.80%
6.46%
8.31%
8.25%

Expiration

Aug 2021
Mar 2017
Dec 2019
Sep 2022 (*)

 (*)  starts in Dec 2019

The gain arising from the volatility of the fair value of these interest rate swaps is shown in Note 24. During 2016, 2015 and 2014,   the Group recorded gains of $2 million, $3 million and
$133 thousand, respectively.

b.

As of December 31, 2015, it corresponds mainly to payables related to CDA in the amount of $36 million.

Note 18 - Guarantee Deposits from Customers

Deposits in cash received from distribution customers. These deposits bear interest at a weighted average interest rate published by the Guatemalan Central Bank and are refundable to clients when they
cease using the electric energy service.

Note 19 – Provisions

Balance at January, 1
Reclassified from long-term liabilities
Provision made during the year
Provision reversed to profit/(loss) during the year
Provision paid
Effects of foreign currency
Balance at December, 31

Financial
Guarantee*

Others**
2016

$ thousands

Total

Others**
2015

$ thousands

— 
34,263 
130,193 

(4,587)  
(36,023)  
(5,083)  

118,763 

41,686 
— 
— 
— 

(40,170)  
(748)  
768 

41,686 
34,263 
130,193 

(4,587)  
(76,193)  
(5,831)  

119,531 

69,882 
— 
14,657 
(46,419)
— 
3,566 
41,686 

* Relates to Kenon’s provision of financial guarantees to Chery in respect of an obligation of Qoros (see Note 10.C.b.6).

** Corresponds to a provisison made by an I.C. Power’s subsidiary as a result of a regulator charge. Expenses related to this provision were recognized in the cost of sales in the amount of $15 million in

2015.

F - 88

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions

A.            Claims

I.C. Power

a. Kallpa Generación S.A.

1.

Import Tax Assessment against Kallpa.

Since 2010, the Peru Customs Authority (known as “SUNAT” for its abbreviation in Spanish) issued tax assessments to Kallpa and its lenders for payment of import taxes allegedly owed by
Kallpa  in  relation  to  imported  equipment  for  installation  and  construction  of  Kallpa  I,  II,  III  and  IV.  The  assessments  were  made  on  the  basis  that  Kallpa  did  not  include  the  value  of  the
engineering services rendered by the contractor of the project in the tax base of import taxes. Kallpa disagrees with this tax assessment on the grounds that the engineering services rendered
include the design of the plant and not the design of the imported equipment. Kallpa appealed the tax assessments before SUNAT in first instance and before the Peruvian Tax Court (known as
“Tribunal Fiscal”) in second instance. SUNAT and the Peruvian Tax Court are administrative institutions under the Ministry of Economy and Finance.

In  January  2015,  the  Tax  Court  rejected  Kallpa’s  appeal  regarding  the  Kallpa  I  assessment.  Kallpa  disagrees  with  the  court´s  decision  and  filed  a  judicial  action  (Demanda  Contencioso
Administrativa) before the Superior Court of Lima on April 15, 2015. In order to file an appeal, Kallpa was required to pay the amounts requested by SUNAT which was was $12 million (S/. 38
million). Subsequently, Kallpa recovered the VAT paid related to this amount. As of December 31, 2016 and 2015 the remaining amount is approximately $10 million (approximately S/. 32
million) respectively.

On January 27, 2016, the amount of the claim in relation with Kallpa IV was reduced by S/. 17 million ($5 million) without interests, from approximately $5 million to $152 thousand (S/. 18
million to S/. 0.5 million ) referred to the engineering services assessment. On February 12, 2016, Kallpa filed an appeal against the part of the resolution that refers to the insurance. As of the
date herein, such appeal is pending to be submitted by SUNAT to the Tax Court.

On September 12, 2016, the Superior Court of Lima issued a ruling on the Kallpa I case declaring its claims to be groundless. Kallpa disagreed with the Court´s decision and, on September 21,
2016, filed an appeal to the Superior Court of Lima. As of December 31, 2016, the Kallpa I assessment liability (including tax, fines and interest) is nil as Kallpa has already paid the total
amount under discussion. With this approach, favorable result of the process would imply a refund of the amounts paid.

As of the end of December 2016, the total tax exposure related to these assessments is as follows:

Kallpa I
Kallpa II
Kallpa III
Kallpa IV

Stage

Superior Court of Lima
Peruvian Tax Court
Peruvian Tax Court
SUNAT

Amount

(In million S/.)    

32.5     
23.0     
22.3     
1.3     
79.1     

Amount
(In million $)  
9.7 
6.8 
6.6 
0.4 
23.5 

Kallpa’s management and its legal advisors are of the opinion that Kallpa´s appeals will more likely than not be successful; accordingly, no provision was recognized in the financial statements
because Kallpa has determined it does not have a present obligation.

2.

Income Tax Audit 2012 against Kallpa

On February 15, 2016, as a result of the 2012 income tax audit, SUNAT issued a preliminary income tax assessment against Kallpa on the basis that certain interest accrued on its debt and some
maintenance expenses amounting to approximately $6 million (approximately S/.22 million) should not have been deducted from its 2012 taxable income but rather treated as an asset.

On March 11, 2016, SUNAT issued a final tax assessment for approximately $5 million (approximately S/.17 million), related to the interest expenses accrued during the construction of the
steam turbine (Kallpa IV) as part of the combined-cycle conversion of the plant. This tax assessment has been confirmed with SUNAT resolution (Resolución de Determinación) notified to
Kallpa on April 18, 2016. On May 16, 2016, Kallpa filed a complaint appeal against the SUNAT assessment which was rejected by SUNAT through a resolution (Resolución de Intendencia)
notified on February 14, 2017. This resolution has been appealed at the Tax Court.

F - 89

 
 
 
 
 
 
 
 
 
 
 
   
 
 
  
 
   
   
   
   
 
 
   
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

Kallpa´s management and its tax counsel have determined that Kallpa should prevail in its appeal as the Tax Court has previously issued precedents that allow for the deduction of interest
expenses in similar circumstances based on the language of article 37a) of the Peruvian Income Tax Law; accordingly, no provision has been recognized in the financial statements because
Kallpa has determined it does not have a present obligation.

As of December 31, 2016, the tax liability is approximately $3 million (S/.12 million) including interest and fines.

b. Compensations against Energuate

As of result of the business combinations described in Note 11.A.1.a, I.C. Power assumed the following main contingencies:

Distribuidora de Electricidad de Occidente S.A. (DEOCSA) and Distribuidora de Electricidad de Oriente S.A. (DEORSA)

Compensations for Technical Service Quality:

Based on the current legal framework in Guatemala, I.C. Power is obliged to compensate its customers for failures in technical service quality. The CNEE establishes parameters for
continuity (number and length of interruptions) and establishes fines for failure to comply with such parameters. As of December 31, 2016, sanction processes initiated by the CNEE
corresponding to a group of processes related to these fines amounted to:

a. DEOCSA: $16 million (Q. 124 million), and
b. DEORSA: $16 million (Q. 121 million)

Actual compensations to customers in accordance with the regulations issued by the CNEE depends on the following future events:

·
·
·
·
·

That the service continues being rendered.
The future consumption volume of the regulated customers with charge from power.
The continuity of the regulation.
That the customer files the claim or that CNEE obliges to compensation.
The compensation mechanism is not applicable to most of the Group's customers.

DEORSA and DEORSA’s management and its legal advisors have determined that there is no current obligation that results under the claims and therefor no provision was recognized in the
financial statements.

F - 90

 
 
 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

c. DEOCSA and DEORSA Tax claim

In  2011,  the  previous  owners  of  DEORSA  and  DEOCSA  acquired  the  companies  through  a  leveraged  buy-out  transaction.  Years  after  the  transaction,  the  Guatemalan  Tax  Authority
(Superintendencia de Administración Tributaria, or the “SAT”) raised questions concerning tax deductions for interest expenses and amortization of goodwill that derived from that transaction.
This culminated in the issuance in February 2015 of two binding tax opinions, one for DEOCSA and another for DEORSA (the “Binding Opinions”) allowing the deductions.

The government of Guatemala changed in January 2016. After the new government took power, in July 2016, the SAT filed a complaint against DEORSA and DEOCSA (the “Complaint”) in
disregard of its own conclusions stated in the Binding Opinions, which Opinions remain in force as of this date. The Complaint requests the payment of alleged back taxes, interest, and fines in
relation to tax years 2011 and 2012. 

On 9 August 2016, the court hearing the Complaint ordered DEORSA and DEOCSA to pay $17 million (Q. 130 million) in alleged back taxes immediately, plus interest and fines within 60
days following the court order, as a condition to lift an order freezing the bank accounts of DEORSA and DEOCSA.  Pursuant to this and another court order of 12 December 2016, on 10
August 2016, DEOCSA and DEORSA paid $17 million to the SAT corresponding to the alleged back taxes, and, on 13 December 2016, they paid $26 million (Q. 193 million) corresponding to
the alleged fines and interest.

Due to the actions of the government and in order to avoid the initiation of complaints concerning tax years 2013, 2014, and 2015, and the corresponding imposition of further fines and interest,
DEORSA and DEOCSA followed the instructions of the SAT and paid the alleged back taxes and interest for those years in the following manner: on  August 9, 2016, DEORSA and DEOCSA
paid a total of $18 million (Q. 138 million) for the years 2014 and 2015; and on August 19, 2016, they paid a total of $13 million (Q. 100 million) for the year 2013. In addition, during 2016,
DEORSA and DEOCSA made additional payments of income tax paid in advance by approximately $5 million (Q. 41 million) corresponding to year 2016.

The abovementioned measures were adopted in order not to put at risk to the continuing operation and prevent irreversible damage to DEORSA and DEOCSA. All payments were made under
protest and subject to a broad reservation of rights, including but not limited to seeking restitution of such payments.  DEORSA and DEOCSA and their legal and tax advisors are of the view
that the deductions for interest expenses and amortization of goodwill are legitimate tax deductions and in the opinion of DEORSA and DEOCSA’s management and its legal advisors it is not
more likely than not that that their position under applicable legal frameworks are favourable. DEORSA and DEOCSA are defending against the SAT Complaint and considering all available
remedies with respect to this matter. Accordingly, no provision was recorded in the financial statements because DEORSA and DEOCSA has determined it does not have a present obligation.

As of December 31, 2016, the total tax claim amounts to $80 million (Q. 603 million). This tax claim has been recorded as a receivable.

d. OPC – Tamar

In July 2013, the EA published four generation component tariffs/power cost indicators, ranging from NIS 386 per megawatt hour, or MWh, to NIS 333.2 per MWh, instead of the single tariff
that had previously been used. In January 2015, the EA published new tariffs, which reduced the tariff rates by approximately 10%. In connection with the indexation of their natural gas price
formula for OPC’s gas supply agreement with the Tamar Partner, OPC and the Tamar Partners disagreed as to which of the EA’s July 2013 tariffs applied to the Tamar’s supply agreement and
have a similar disagreement with respect to the tariffs published in January 2015. Subsequent to the period of the report, on February 2, 2017, OPC received a letter from Tamar's attorney
claiming a debt of $25 million (including accrued interest) and requesting that such amount be deposited in escrow pursuant to the GSPA. Based on the OPC's legal consultant’s opinion, it is
more likely than not that OPC’s defence of this claim will ber successful. Consequently, no provision was recognized in the financial statements as OPC’s management has concluded it does not
have a present obligation under this claim.

F - 91

 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

B. Commitments

I.C. Power

a.

I.C. Power Ltd

As of December 31, 2016, I.C. Power has issued guarantees for a total amount of $70 million, as follows:

Guarantee party
Advanced Integrated Energy Ltd
OPC Rotem Ltd.
OPC Rotem Ltd.
OPC Rotem Ltd.

OPC Rotem Ltd.
Advanced Integrated Energy Ltd
Advanced Integrated Energy Ltd
Advanced Integrated Energy Ltd
Advanced Integrated Energy Ltd
Advanced Integrated Energy Ltd

OPC Rotem Ltd.

Description

NIS thousands

$ thousands

Cash Collateral
$ thousands

Facility agreement
Facility agreement (1)
PUA/EA Standards requirements - infrastructure services
PUA/EA Standards requirements - infrastructure services
Exposure of non-payment default resulting from "Ex post
payments"

  GSPA agreement
INGL agreement
Conditional license
INGL – PRMS construction
Supply and generation licenses
Ensure payments of IPP Rotem Operation and Maintenance
Ltd.

100,000 
45,000 
38,595 
32,235 

12,000 
— 
295 
822 
9,100 
4,495 

— 

26,036 
11,716 
10,048 
8,393 

3,124 
6,600 

214 
2,369 
1,170 

350 

- 
5,858 
20,159 (2 )

— 

— 

3,515 (3 )
3,455 (3 )

- 
1,273 

358 

(1) On December 2014, in light of the Israel Corporation Ltd. split, the corporate guarantee issued by IC was replaced and a cash collateral deposited into a designated pledged account of OPC.
(2) Cash collateral for the two guarantees related to PUA/EA Standards requirements - infrastructure services
(3) Cash collateral for conditional license, INGL agreement and supply and generation licenses.

b.

Inkia Energy Ltd

As of December 31, 2016, Inkia has issued standard by letters of credit for a total amount of $54 million for guarantee, as follows:

Guarantee party
Inkia Energy Ltd. 
Samay I S.A. 
Kanan overseas I, Inc 
Kanan overseas I, Inc 
Kanan overseas I, Inc 
Kanan overseas II, Inc 
Kanan overseas I, Inc 

c. Cobee, Bolivia

Concession from the Bolivia Government

  Description

Contingent equity for over costs
Contract Compliance
Power Purchase agreement
Power Purchase agreement
Spot Purchases
Power Purchase agreement
Storage and handling agreement

  $ thousands  
15,729 
15,000 
9,534 
7,334 
4,000 
1,467 
600 

As of December 2010, COBEE was engaged in the generation of electricity under a concession granted to it by the Government of Bolivia, in October 1990 for a period of 40 years. The Bolivian
government  unilaterally  transformed  by  supreme  decree,  all  concessions  to  generate,  transmit  and  distribute  electricity  to  special  temporary  licenses.  However,  to  date,  the  government  has  not
issued regulations nor approved any procedure or guideline to convert such special temporary licenses into permanent licenses.

F - 92

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

Power Purchase Agreement (PPA)

In March 2008, COBEE signed a long-term PPA agreement with Minera San Cristobal. Pursuant to the agreement, COBEE will supply 43 MW of availability and energy, commencing from
December 22, 2008. The PPA agreement provides a fixed price for availability, and an energy price that is linked to the price of natural gas for production of electricity in Bolivia. Surplus energy
and availability are sold in the spot market. The PPA agreement is scheduled to expire in October 2017.

In December 2011, the Bolivian Government amended the applicable law to prohibit generation companies from entering new PPAs. Therefore, COBEE will be unable to extend or replace this
PPA, under which we have contracted 18.9% of COBEE’s installed capacity.

d. Kallpa, Peru

Power Purchase Agreements (PPA)

As of December 31, 2016, Kallpa has entered into thirty two PPAs with unregulated consumers to provide capacity and the associated energy of 621 MW (twenty seven PPAs of 522 MW as of
December  31,  2015).  These  contracts  have  various  commencement  dates,  and  expires  between  2013  and  2028.  Also,  as  of  December  31,  2016,  Kallpa  has  signed  twenty  seven  PPAs  with  7
distribution companies for 590 MW (thirteen PPAs with 8 distribution companies for 660 MW as of December 31, 2015).

The Peruvian market functions on the marginal cost method in which the generators bid their marginal cost to the market regulator who instructs the most efficient generators to produce electricity
for the system. In the event Kallpa is not capable to meet its commitments under the contracts, Kallpa will be required to purchase energy in the spot market.

Gas Supply and Transportation

Kallpa purchases natural gas for its generation facilities from the Camisea consortium under an exclusive natural gas supply agreement dated January 2, 2006, as amended. Under this agreement,
the  Camisea  Consortium  agreed  to  supply  Kallpa’s  natural  gas  requirements,  subject  to  a  daily  maximum  amount  and  Kallpa  agreed  to  acquire  natural  gas  exclusively  from  the  Camisea
Consortium.

The Camisea consortium is obligated to provide a maximum of 4,250,000 cubic meters of natural gas per day to our Kallpa plant and Kallpa is obligated to purchase a minimum of approximately
2,225,000 cubic meters of natural gas per day as follows:

First gas turbine
Second gas turbine
Third gas turbine
Combined cycle
Total

Cubic meters per day

To be provided
by Consortium    

Minimum
Purchase

1,200,000 
1,300,000 
1,300,000 
450,000 
4,250,000 

648,000 
702,000 
650,000 
225,000 
2,225,000 

In the event that Kallpa does not consume the contracted minimum on any given day, Kallpa is permitted to use that lacking quantity on any day during the course of the following 18 months from
the day of under-consumption.

The price that Kallpa pays to the Camisea consortium for the natural gas supplied is based on a base price in U.S. dollars set on the date of the agreement, indexed monthly based on a basket of
market prices for heavy fuel oil, with discounts available based on the volume of natural gas consumed. This agreement expires in June 2022.

Kallpa’s  natural  gas  transportation  services  are  rendered  by  Transportadora  de  Gas  del  Peru  S.A.  (“TGP”)  pursuant  to  a  natural  gas  firm  transportation  agreement  dated  December  2007,  as
amended.  In  April  2014,  this  agreement  was  further  modified  to  include  the  transportation  agreement  between  Duke  Energy  Egenor  S.  en  C.  por  A.  and  Las  Flores.  This  agreement  expires  in
December 2033.

In addition, Kallpa is party to two additional natural gas transportation agreements that expire in April 2030 and April 2033, respectively.

F - 93

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

Set forth below is a summary of the natural gas transportation services under these agreements (in cubic meters of gas per day):

Periods

Initial Date – April 21, 2016
April 22, 2016 - March 20, 2020
March 20, 2020 - January 1, 2021
January 2, 2021 - March 31, 2030
April 1, 2030 - March 31, 2033
April 1, 2033 - December 31, 2033

Firm

3,474,861     
4,854,312     
4,655,000     
4,655,000     
3,883,831     
2,948,831     

Interruptible  
1,329,593 
764,463 
764,463 
530,000 
1,301,169 
1,301,169 

Natural  gas  distribution  services  are  rendered  by  Cálidda,  under  two  natural  gas  distribution  agreements.  Under  such  agreements,  which  expire  on  December  31,  2033,  Cálidda  is  obliged  to
distribute up to approximately 3,710,000 cubic meters of natural gas per day to Kallpa combined-cycle plant and 1,144,312 cubic meters of natural gas per day to Las Flores power plant.

e.

Samay I, Peru

Power Node Bid Awarded

On November 29, 2013, Samay I won one of the public bid auctions promoted by the Peruvian Investment Promotion Agency (“Proinversion”) to build an open cycle diesel and natural gas (dual-
fired) thermoelectric plant in Mollendo, Arequipa (southern Peru), with an installed capacity of approximately 616 MW (when operated with diesel fuel). The two- bid auction, which was won by
Samay I and a subsidiary of Engie, is part of an effort by the Peruvian government to promote the construction of a power node in southern Peru, which will be fueled by natural gas once a natural
gas pipeline (the Gasoducto Sur Peruano) delivers gas to the area.

The Samay I plant is expected to have three operational stages. First, it will operate as a cold reserve plant with diesel until natural gas becomes available in the area through a pipeline currently
under construction. It is uncertain when the pipeline will be completed. Second, once natural gas becomes available to the facility through the new natural gas pipeline, the Samay I plant will have
the obligation to operate as a natural gas-fired power plant and will be able to do so with minor investments by us in Samay I’s facilities. When fueled by natural gas, the Samay I plant will have an
installed capacity of approximately 720 MW. Finally, following an additional investment in the conversion of the Samay I plant, which we have not committed to make, the Samay I plant could
operate as a combined cycle thermoelectric plant, which would increase Samay I’s installed capacity to approximately 1,080 MW. Samay I has entered into an agreement with the State of Peru,
with a term of 20 years, under which Samay I will receive fixed monthly capacity payments denominated in U.S. Dollars and we will pass-through all of the variable costs during the cold reserve
phase. The amount of monthly payments required to make up the total amount to which Samay I is entitled will be calculated by the COES, and will be paid by all generators that form part of the
SEIN who, in their turn collect the corresponding fee from their customers through a surcharge in the transmission tariffs applicable to, and payable by, all end consumers. The surcharge does not
involve the use of state funds or any appropriation process, being a mechanism that has been used for almost 20 years in Peru to cover the cost of various energy projects.

In addition to receiving a 20-year stream of capacity payments, Samay I has an advantage in being one of only two power generation companies that have defined rights to a natural gas supply and
transportation capacity once the Gasoducto Sur Peruano is completed. The developer of such pipeline has a contractual obligation under its concession agreement with the State of Peru to build a
branch of the pipeline to connect it with the Samay I plant. Our strategic development of the Samay I plant will provide us with a significant advantageous position in the future southern Peru power
node, which will develop once the Gasoducto Sur Peruano is completed. Pursuant to the terms of its tender, Samay I must receive gas and transportation services pursuant to terms which are similar
to other power plants located in other parts of Peru and served by the existing TGP pipe line, such as the Kallpa plant. According to Law 29970, natural gas transportation costs of the Samay I plant
will be eventually subsidized by additional tariffs on the electricity transmission toll periodically determined by OSINERGMIN with the purpose of decentralizing the generation of electricity with
natural gas, which is one of the main purposes of the State of Peru developing the southern Peru power node. ElectroPerú has commenced negotiations with suppliers and concessionaires for the
supply and transport of natural gas to each of Samay I and the other plant with a defined right to the firm supply of natural gas. However, as ElectroPerú may not be successful in obtaining an
agreement which conforms to the conditions as contemplated in the tender documents of the cold reserve bidding process, we believe Samay I has the right to reject entering into any supply and
transportation agreements which do not comply with the conditions set forth in its tender.

Samay I reached COD in May 26, 2016.

F - 94

 
 
 
 
   
   
   
   
   
   
   
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

f.

CDA, Peru

Power Purchase Agreements (PPA)
As of December 31, 2016, CDA has entered into three PPAs which are a 15-year PPA with ElectroPerú to provide 200 MW of capacity and the associated energy that commenced in 2016 a 10-year
PPA with Luz del Sur S.A.A., Edelnor and Edecañete, to provide 202 MW of capacity and the associated energy that commences in January 2018, and a 10-year PPA with Edelnor and Edecañete to
provide 81 MW that commences in January 2022 which will account for a significant portion of CDA’s expected generation capacity. The PPA with ElectroPerú is denominated in U.S. Dollars and
is indexed to the U.S. producer price index. Although CDA operates a hydroelectric plant, its PPAs are indexed to natural gas prices, with exposures to fluctuations in such prices.

g. OPC, Israel

Power Purchase Agreements (PPA)

On November 2, 2009, OPC signed a PPA with Israel Electric Company Ltd. (“IEC”)  whereby OPC undertook to construct a power plant within 49-52 months from the PPA signing date, while
IEC undertook to purchase capacity and energy from OPC., over a period of twenty (20) years from the commencement date of COD of the plant. The PPA is a “capacity and energy” agreement,
meaning, a right of OPC to provide the plant’s entire production capacity to IEC, and to produce electricity in the quantities and on the dates as required by IEC.

Power Purchase Agreements with end users

The PPA with IEC provides OPC with the option to allocate and sell the generated electricity of the power station directly to end users. OPC has exercised this option and sells all of its energy and
capacity directly to end users. Most of the agreements are for a period of 10 years. The consideration tariff, are based on the time of use electricity tariff (“TAOZ”), the generation component of the
time of use electricity tariff, less a discount from the generation component. Both the TAOZ and the generation component are determined by the Public Utility Authority - Electricity (“PUA”) and
are updated from time to time.

If the consideration is less than a minimum tariff of the generation component, I.C.Power   has the right to terminate the agreements.

The agreements guarantee a certain level of availability of the power plant below which, customers are entitled to compensation.

Natural supply gas agreement

On  November  25,  2012,  OPC  signed  an  agreement  with  Noble  Energy  Mediterranean  Ltd.,  Delek  Drilling  Limited  Partnership,  Isramco  Negev  2  Limited  Partnership,  Avner  Oil  Exploration
Limited Partnership and Dor Gas Exploration Limited Partnership ("Tamar Partners") regarding the natural gas supply to the power plant. The agreement shall terminate upon the earlier of: a 16
years term as from the date of gas flow to the power plant or until OPC has consumed the entire contractual quantity .In addition, each party has the right to extend the period of the agreement for a
period of up two additional years under certain conditions or until the date of consuming the total contract quantity, whichever is earlier ("Tamar Agreement").

The  price  of  the  gas  is  linked  to  changes  in  the  "Production  Cost"  Tariff,  which  is  part  of  TAOZ,  and  partially  linked  to  the  USD  representative  exchange  rate,  and  includes  "a  floor  price".
According to the Tamar Agreement, OPC   shall purchase natural gas with a total contractual quantity of 10.6 BCM (billions of cubic meters). OPC   is under a “take or pay” obligation regarding a
certain annual quantity of natural gas based on a mechanism set forth in the Tamar Agreement. The Tamar Agreement contains certain conditions that provide in the future flexibility to reduce the
minimum annual quantity.

On December 28, 2015, the agreement received the Israeli Antitrust Authority, ("Authority") approval.

F - 95

 
 
 
 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

The Tamar Agreement allows curtailing OPC’s gas supply during the interim period in case of a shortage in gas supply, and gives preference, in this scenario, to certain Tamar Partners customers
over OPC. However, in December 2012, the Natural Gas Committee published a decision (6/2012) (the "Gas Committee's Decision") with respect to the regulation of the use of the capacity of the
gas pipe from the Tamar reserve, in case of a shortage in the gas pipe's capacity, and the foregoing regulation differs from the relevant arrangement in the Tamar Agreement. OPC believes that a
proportional (pro rata) allocation as described in the Gas Committee's Decision may increase the quantity of gas received by OPC under the Tamar Agreement, in case of shortage in the capacity of
the gas pipe. The manner of implementation of the Gas Committee's decision, if it is implemented, and the potential effect, if any, on the Tamar Agreement are unknown. On April 12, 2016, in
preparation for a potential shortage which could have been caused as the result of planned maintenance operations by the Tamar Partners, the Chairman of the Natural Gas Committee sent a notice
to the buyers of gas from the Tamar Partners, reflecting a materially different mechanism from the Gas Committee's Decision. According to the foregoing notice, the system's administrator (IEC)
shall  be  responsible  for  the  allocation  of  gas  among  the  electricity  producing  gas  consumers.  In  case  of  shortage,  low-pressure  distribution  grid  users  shall  have  preference  over  high-pressure
national transmission systems (such as OPC), which shall be allocated gas proportionally (pro rata). The legal effect of the foregoing notice is unclear, and OPC is unable of assessing its effect on it,
if any, in case of potential gas shortage.

During the years 2015 and 2016, the Electricity Authority (“EA”, formerly known as PUA) updated the generation component of the TAOZ. This tariff is used to determine the price calculation
between OPC and the end users, and for the natural gas price indexation. As a result of these adjustments, the generation component was reduced in about 10% starting February 2015 and in about
5% starting September 13, 2015. A decline in generation component will result in a corresponding decline in the rates the Group charges its customers and, accordingly, its revenues.  In December
2016, the EA published its decision regarding an update of the generation component of the TAOZ, which became effective on January 1, 2017, and further reduced the generation component tariff
by approximately 0.5% from NIS 265.2 per MWh to NIS 264 per MWh (as opposed to the 8% reduction that was initially proposed in the October 2016 EA draft decision) . However, as part of the
December 2016 EA decision, TAOZ was also adjusted to reflect a decrease in certain payments made by IPPs to the IEC. As a result of such adjustment, OPC’s tariffs effectively increased by
approximately 2% (despite the 0.5% reduction in the generation component tariff). The next annual update of the generation component tariff is expected to be conducted in December 2017.

System Management Charges

Since 2013, the EA had been in the process of determining a system cost tariff. In August 2015, the EA published a decision that IPPs in Israel would be obligated to pay system management
service charges, which charges are retroactively effective as of June 1, 2013. According to the EA decision, as amended in September 2015, the amount of system management service charges that
would be payable by OPC from the effective date of June 1, 2013 to June 30, 2015, was approximately NIS 159 million (approximately $41 million), excluding interest rate and linkage costs, based
upon the “average rate” of the system management service charges. However, as the rate of the new system management service charges, like other rates of the EA, varies by season (e.g., summer
and winter) and by demand period (peak, shoulder and off-peak), IEC’s final calculation of the amount payable by OPC was based upon the applicable time of use rates, which provides different
energy rates for different seasons (e.g., summer and winter) and different periods of time during the day, or “Time of Use” rates. In December 2015, OPC received an invoice from IEC (in its
capacity  as  the  system  manager)  regarding  the  NIS  163  million  (approximately  $42  million)  amount  of  system  management  service  charges  that  would  be  payable  by  OPC  for  such  period,
including interest rate and linkage costs.

In February 2016, OPC paid NIS154 million (approximately $40 million) to IEC in satisfaction of this amount (excluding the interest rate, and linkage costs). In August 2016, the EA published a
decision to change the method of calculation of the interest rate and to reduce the interest rate payable by IPPs (including OPC) with respect to system management service charges payable by them
from the effective date of June 1, 2013 to September 13, 2015 (amounting to approximately 2.5% of the total amounts payable by IPPs in respect of the system management charges). As a result of
the resolution, the system management cost provision was updated to a total amount of NIS 3 million (approximately $768 thousand). The adjustment of the provisions was allocated to the cost of
sales and to the finance expenses.

F - 96

 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

h. AIE, Israel

Power and Steam Purchase Agreement (“PSPA”)

On August 10, 2015, AIE and Hadera Paper entered into two agreements for the supply of electricity and steam to Hadera Paper’s facility:

·

·

Short Term PSPA - Pursuant this agreement, AIE will supply steam and electricity until COD of the power plant, which shall be done through the existing energy center.

Long Term PSPA – Pursuant this agreement, AIE will supply steam and electricity during the period commencing upon COD of the power plant and for a period of 18 years thereafter.

In consideration for electricity purchased under each of the PSPAs, Hadera Paper will pay an electricity tariff which is based on a certain discount in comparison with the electricity tariffs charged
by the Israeli Electric Company Ltd. The steam price paid by Hadera Paper is subject to adjustment based upon Hadera Paper’s annual steam consumption.

Hadera Paper is under a “take or pay” obligation ("the TOP") regarding a certain annual quantity of steam based on a mechanism set forth in the agreements.

Under the PSPAs, the AIE is obligated to certain availability with respect to the supply of electricity and steam, which obligation excludes unavailability due to events predominately not in the
control of the AIE. In addition, in certain circumstances, the AIE may be subject to penalties in the event of delays in the COD of the power plant. AIE’s liability is subject to an annual cap, as set
out in the agreements.

Power Purchase Agreements with end users

During 2016, AIE signed 10-year agreements for sale of most of its capacity of its power plant, to end users. The agreements are for a period of 10 years, where under some of the agreements the
end user has an early termination right after 5 years giving counter offer 6 months in advance. AIE has the right of first refusal. In addition, under some of the agreements the end user has an early
termination right if it constructs a power plant for its needs, provided it gives notice 18 months in advance. The consideration was set based on the TAOZ tariff less a discount from the generation
component. If the consideration is less than a minimum tariff of the generation component, has the right to terminate the agreements and to sell the electricity to the IEC, in accordance with the
PPA agreement.

The agreements include compensation in the event of delay of power plant’s COD and compensation for unavailability of the power plant below an agreed minimum level.

Gas Sale and Purchase Agreement (“GSPA”)

On January 25, 2012, Hadera Paper entered into a gas sale and purchase agreement (hereinafter- the “GSPA”) with Noble Energy Mediterranean Ltd., Delek Drilling Limited Partnership, Isramco
Negev  2  Limited  Partnership,  Avner  Oil  Exploration  Limited  Partnership,  Dor  Gas  Exploration  Limited  Partnership  and  Everest  Infrastructures  Limited  Partnership  (hereinafter-  the  “Tamar
Partners”)  regarding  the  natural  gas  supply  to  Hadera  Paper’s  existing  gas  consuming  facilities  (i.e.  the  Energy  Center)  as  well  as  the  intendedadditional  capacity  of  the  power  plant  under
construction. The agreement was amended on October 16, 2012.

On August 10, 2015, the GSPA was assigned to AIE pursuant to the terms of the share purchase agreement. The GSPA will terminate upon the earlier of 15 years following the commencement of
supply from the Tamar reservoir (April 2013) or until the date of consuming the total contract quantity (118,000,000 MMBTU). In addition, both parties have an option to extend the GSPA by up
to two years in the event the total contract quantity was not yet consumed by the end of the GSPA term.

The price of the gas is linked to the weighted average generation cost tariff, published by the EA, and includes a “floor price”. In addition, the GSPA includes the TOP regarding a certain annual
quantity of natural gas based on a mechanism set forth in the GSPA.

In  addition,  on September  6, 2016, AIE and  the Tamar  Partners  entered  into  an additional  GSPA (“Additional  GSPA”) for the  supply  of additional  quantities  of  natural  gas (in  addition  to  the
original GSPA) as of the commissioning of the intended power plant.

F - 97

 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

The additional GSPA will terminate upon the earlier of 15 years following the completion of the commissioning of the power plant (which shall be concluded by no later than March 31, 2019) or
until the date of consuming the total contract quantity (68,000,000 MMBTU, which shall be adjusted if and when the additional GSPA were to become on a firm supply basis). In addition, both
parties have an option to extend the term of the additional GSPA by up to three years in the event the total contract quantity was not yet consumed by the end of the additional GSPA term.

The price of the gas is linked to the weighted average generation cost tariff, published by the EA, and includes a “floor price.”

Israel Natural Gas Lines Ltd. Agreement for the Transmission of Natural Gas

On July 11, 2007, Hadera Paper signed a gas transmission agreement with Israel Natural Gas Lines Ltd. (hereinafter- “INGL”), which was assigned to AIE on August 10, 2015, in accordance to the
SPA. The agreement as amended on June 7, 2013 and March 31, 2015 is extended until July 14, 2018 and governs the transmission of natural gas to the Energy Center. The agreement was further
extended and modified by a third amendment on December 28, 2015 which facilitates transmission of natural gas to the power plant, by means of the construction and installation of a new pressure
regulation and measurement (PRMS) station, and includes additional commercial terms. The duration of the agreement, as modified by the third amendment, shall be 16 years from an agreed upon
“start date” with an option for extension. The “start date” in accordance with the third amendment, will occur within a window of time as stipulated in the agreement. Such window may be
postponed due to reasons attributable to changes in specifications of the PRMS or to the land on which the PRMS is to be constructed.

Gas Sale Agreement with Oil Refineries Ltd. (“ORL”)

On December 23, 2015, AIE contracted with ORL for the sale of surplus gas quantities supplied to it pursuant to the Tamar agreement. The agreement is for a period of three years from January 1,
2016, with an option for extension of such period as well as early termination rights. In addition, ORL is under the TOP obligation regarding a certain annual quantity of natural gas based on a
mechanism set forth in the agreement. AIE has an option to stop selling gas if it reaches the commercial operation earlier than expected or in February 2018 with prior written notice.

SerIDOM Servicios Integrados

On January 21, 2016 AIE contracted with SerIDOM Servicios Integrados IDOM, S.A.U (hereinafter – "SerIDOM") for the design, engineering, procurement and construction of combined cycle
cogeneration power plant, with an installed capacity of 140 MW, on lump sum, turnkey basis. In accordance with the EPC contract, SerIDOM committed to complete construction of the power
plant by July 2018. The total cost of the contract is approximately $150 million. Payment of the consideration is based on progress of the construction and compliance with milestones. SerIDOM
committed to compensate AIE in a case of delay or non-compliance with any of its contractual obligations up to the amounts stipulated in the EPC contract, and provided AIE a bank guarantee and
a parent company guarantee to secure these commitments.

In September 2016, Hadera entered into a Variation Order to the EPC contract in the scope of which the payments to SerIDOM were increased by approximately $4 million and an extension of
time for construction completion was provided within the second half of 2018.

i.

Energuate, Guatemala

Power Purchase Agreements and Spot Market Purchases

Energuate purchases the electricity it distributes to its customers through PPAs with generation companies including, for example, our subsidiary Puerto Quetzal. Guatemalan distribution
companies are required by the General Electricity Law to maintain PPAs with generating companies at all times to cover 100% of the maximum expected demand for the current year, as well as the
next year. Should the contracted capacity and electricity under its PPAs be insufficient to meet the demand of its customers, Energuate makes purchases on the spot market, only if authorized by
CNEE.

As of December 31, 2016, Energuate was party to over 80 PPAs. Distribution companies can only purchase capacity and energy and enter into PPAs through a public bidding process supervised by
the CNEE.

F - 98

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

The following table sets forth the supplier, the amount of contracted capacity and the expiration date of Energuate’s PPAs entered into with our five largest suppliers of capacity as of December 31,
2016, covering 67% of our collective contracted capacity.

Supplier
Jaguar Energy Guatemala LLC 
INDE 
Energía del Caribe 
Renace, S.A. 
Hidro Xacbal, S.A. 

Contracted
Capacity 
(MW)

200 
162 
60 
55 
30 

Expiration Date
April 2030
April 2017 –April 2032
April 2030
April 2030 –April 2033
April 2030 –April 2032

Under most of its PPAs, Energuate pays a capacity charge and an energy charge. Energuate pays a specified amount for each MW of capacity purchased under these PPAs and an electricity charge
for the KWh of electricity actually delivered to Energuate. Most of Energuate’s PPAs also provide that the electricity charge is indexed to changes in published quotations for the type of fuel used
by the generator. In addition, Energuate is required to pay certain additional costs incurred by the generators to provide electricity including connection costs, transmission tolls, additional costs
imposed by the CNEE and other similar costs.

In addition, Energuate has entered into 59 PPAs that will begin starting 2017. The following table establish the five largest suppliers for these contracts, covering 69% of the contracted capacity for
the next few years.

Supplier
Ingenio la Unión S.A
Ingenio Magdalena
INDE
Renace S.A
Energía Limpia de Guatemala S.A

  Concession from the Guatemalan Government

Contracted
Capacity 
(MW)

90 
72 
51 
31 
21 

Expiration Date
April 2018 – April 2020
April 2018 –April 2032
April 2018 - April 2032
April 2030 –April 2033
April 2032

In 1998, Energy and Mining Ministry of Guatemala authorized DEORSA and DEOCSA, for a term of 50 years, to operate in the east and west areas of the country.

The authorization granted for the Concessions can either be terminated (i) at the end of the original term (2048) or (ii) by the regulatory authorities due to non-compliance of the obligations
assumed in the Concessions, in accordance with the procedures set in the Title III, Chapter III of the General Electricity Law. Once the authorization is terminated, rights and goods relating to the
Concessions will be auctioned publicly as an economic unit, within one hundred and eighty (180) days. The former concessionaire can participate of the auction process except in the event the
authorization had been terminated for poor quality of the service. From the value obtained in the auction process, the Ministry of Energy and Mining will deduct the expenses incurred and debts
that the former concessionaire may have and the remaining amount will be transferred to the former concessionaire.

j.

Nejapa El Salvador

Power Purchase Agreements (PPA)

In May 2013, Nejapa entered into two PPAs that were awarded as a result of two tenders for 71.2 MW and 38.8 MW of capacity, with 54-month and 48-month terms, respectively. Each PPA was
divided among the seven distribution companies that conducted the tenders. The term of each PPA commenced in August 2013.

In December 2014, Nejapa entered into PPA with seven distribution companies for 30 MW of capacity with 36-month term starting from January 2015 .

F - 99

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 20 – Contingent Liabilities, Commitments and Concessions (Cont’d)

k.

Poliwatt, Guatemala

Power Purchase Agreements (PPA)

As of December 31, 2016, Poliwatt has entered into thirteen PPAs with no related parties to provide capacity and energy of 175 MW. These contracts have various commencement dates, and vary
in duration between 2017 and 2020.

Also, Poliwatt has entered into seven PPAs with related parties as of December 31, 2016, to provide capacity and energy of 69 MW. These contracts have various commencement dates, and vary in
duration between 2017 and 2020.

l.

I.C. Power Nicaragua, Nicaragua

Power Purchase Agreements (PPA)

As of December 31, 2016, Tipitapa Power Company and Empresa Energetica Corinto have entered into two PPAs with Distribuidora de Electricidad del Norte (“DISNORTE”) and Distribuidora de
Electricidad del Sur (“DISSUR”) to supply and sell energy and capacity.

In addition, Consorcio Eólico Amayo and Consorcio Eólico Amayo (Fase II) also entered into PPAs with these distribution companies, and are committed to supply and sell all the energy at the
supply node as part of the wholesale market.

These contracts have various commencement dates, and vary in duration, as follows:

Company
Tipitapa Power Company
Empresa Energetica Corinto
Consorcio Eólico Amayo
Consorcio Eólico Amayo (Fase II)

Commencement
June 1999
April 1999
March 2009
March 2010

m. Kanan Overseas I, Inc, Panama

Power Purchase Agreement

Expiration
December 2018
December 2018
March 2024
March 2025

  Contracted  
Capacity
(MW)

51 
50 
40 
23 

In October 2014, Kanan was awarded a contract to supply energy with a maximum contractual capacity of 86 megawatts with distributions companies for a 5 year term that effectively started in
December, 2015. Kanan reached commercial operations in March 2016.

n.

Jamaica Power Private Company (JPPC), Jamaica

Power Purchase Agreement

JPPC  entered  into  a  Power  Purchase  Agreement  with  Jamaica  Public  Service  Company  Limited  (JPS).  JPS  will  purchase  the  contract  capacity  (60MW),  as  defined,  at  specified  rates  under  a
dispatchable arrangement. The agreement expires 20 years from the commercial operations date of January 1998 and may be extended for successive periods of 5 years upon mutual agreement.

F - 100

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
     
 
 
 
 
 
 
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
 
 
 
Note 21 – Share Capital and Reserves

 A.

Share Capital

Authorised and in issue at January, 1
Authorised and in issued as part of the spin-off from IC

Issued for share plan
Authorised and in issue at December. 31

Company
No. of shares
(’000) 

2016

2015

53,694     
—     
53,694     
26     
53,720     

23,500 
29,883 
53,383 
311 
53,694 

All shares rank equally with regards to Company’s residual assets.  The holders of ordinary shares are entitled to receive dividends as declared from time to time, and are entitled to one vote per
share at meetings of the Company.  All issued share are fully paid with no par value.

The capital structure of the Company comprises of issued capital and accumulated profits.  The management manages its capital structure to ensure that the Company will be able to continue to
operate as a going concern.  The Company is not subjected to externally imposed capital requirement.

Issuance of ordinary shares

In 2016, 25,692 (2015: 310,960) ordinary shares were granted under the Share Incentive Plan to key management at an average price of $9.34 (2015: $19.76) per share.

 B. Translation reserve

The  translation  reserve  includes  all  the  foreign  currency  differences  stemming  from  translation  of  financial  statements  of  foreign  activities  as  well  as  from  translation  of  items  defined  as
investments in foreign activities commencing from January 1, 2007 (the date IC first adopted IFRS).

 C. Capital reserves

Capital reserves reflect the unrealized portion of the effective part of the accrued net change in the fair value of hedging derivative instruments that have not yet been recorded in the statement of
profit or loss.

 D. Kenon's share plan

Kenon has established a share incentive plan for its directors and management. The plan provides grants of Kenon shares, as well as stock options in respect of Kenon’s shares, to directors and
officers of the Company, and IC pursuant to awards, which may be granted by Kenon from time to time, representing up to 3% of the total issued shares (excluding treasury shares) of Kenon.
During  2015  and  2014,  Kenon  granted  awards  of  shares  to  certain  members  of  its  management.  Such  shares  are  vested  upon  the  satisfaction  of  certain  conditions,  including  the  recipient’s
continued employment in a specified capacity and Kenon’s listing on each of the NYSE and the TASE. The fair value of the shares granted in 2016 is $240 thousand (2015: $940 thousand, 2014:
$5  million)  and  was  determined  based  on  the  fair  value  of  Kenon’s  shares  on  the  grant  date.  Kenon  recognized  $547  thousand  as  general  and  administrative  expenses  in  2016  (2015:  $566
thousand, 2014: $5 million).

F - 101

 
 
 
 
 
 
 
 
 
 
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 22 – Cost of Sales and Services

Capacity and energy purchases and transmission costs (a)
Fuel, gas and lubricants (b)
Payroll and related expenses
Regulatory expenses
Third party services
Plant unavailability
Intermediation fees (c)
Maintenance expenses
Other

2016

For the Year Ended December 31
2015
$ thousands

2014

670,452 
458,427 
55,647 
57,878 
37,671 
6,946 
4,670 
41,489 
25,390 
1,358,570 

292,242 
468,343 
35,635 
(8,025)  
12,581 
— 
6,223 
37,470 
18,386 
862,855 

276,652 
502,170 
31,369 
14,146 
10,838 
— 
— 
26,787 
119,179 
981,141 

(a)
(b)
(c)

In 2016, it includes energy purchases of $355,554 thousand incurred by distribution companies.
Fuel cost is primarily heavy fuel oil consumed by the thermal plants in El Salvador, the Dominican Republic, Jamaica, Nicaragua and Guatemala.
Fees paid by Kallpa in relation to the profit shared on certain PPAs signed with distribution companies.

Note 23 – Selling, General and Administrative Expenses

Payroll and related expenses
Depreciation and amortization
Professional fees
Other expenses

2016

For the Year Ended December 31
2015
$ thousands

2014

57,549 
12,686 
34,125 
42,396 
146,756 

45,731 
9,130 
23,377 
25,585 
103,823 

57,669 
7,724 
37,944 
27,781 
131,118 

F - 102

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 24 – Other Income and Expenses

Other Income
From changes in interest held in associate (See Note 10)
Insurance claims (a)
Termination of contract compensation (b)
Delays of contract compensation (c)
Transfer of assets from customers
Release of contingent accrual (d)
Dividend income from other companies
Gain on sale of property, plant and equipment
Other

Other expenses
Other

2016

For the Year Ended December 31
2015
$ thousands

2014

— 
2,525 
7,398 
3,377 
1,593 
1,205 
— 
4 
4,908 
21,010 

5,413 
5,413 

— 
6,917 
550 
— 
— 
545 
3,850 
14 
3,574 
15,450 

7,076 
7,076 

19,553 
7,452 
— 
— 
— 
— 
18,178 
— 
5,854 
51,037 

13,970 
13,970 

(a) Corresponds mainly to Consorcio Eolico Amayo (Fase II) and COBEE claims in relation to three wind towers damaged and Sainani plant, respectively.
(b)
(c)
(d) Comprise of JPPC holdings release part of its contingent accruals.

Includes termination of contract compensation received by Kallpa from Coelvisac and Compania Minera Raura in 2016 and 2015, respectively.
Includes compensation received by Energuate for delays in the start of power supply by generators companies.

Note 25 – Financing Income (Expenses), Net

Financing income
Interest income from bank deposits
Net change from change in exchange rates
Net changes in fair value of Tower options series 9
Net change in fair value of derivative financial instruments
Other income
Financing income
Financing expenses
Interest expenses to banks and others
Net change in fair value of derivative financial instruments
Net change from change in exchange rates
Other expenses
Financing expenses

Net financing expenses recognized in the statement of profit and loss

F - 103

2016

For the Year Ended December 31
2015
$ thousands

2014

3,703 
8,972 
- 
1,561 
4,245 
18,481 

(182,905)  

- 
- 

(6,694)  
(189,599)  

(171,118)  

2,675 
- 
2,119 
3,400 
5,218 
13,412 

(107,419)  

- 

(12,554)  
(4,255)  
(124,228)  

(110,816)  

2,226 
- 
8,350 
- 
5,667 
16,243 

(108,224)
(592)
- 
(1,363)
(110,179)

(93,936)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 26 – Income Taxes

A.        Components of the Income Taxes

Current taxes on income
In respect of current year
In respect of prior years
Deferred tax income
Creation and reversal of temporary differences
Total taxes on income

2016

For the Year Ended December 31
2015
$ thousands

2014

33,975 
331 

25,028 
59,334 

29,509 

(294)  

33,163 
62,378 

95,252 
(1,518)

9,607 
103,341 

In 2014, $2 million of previously unrecognized tax losses was used to reduce our current tax expense in Israel. No previously unrecognized tax benefits were used in 2015 or 2016 to reduce our current
tax expense.

B. Reconciliation between the theoretical tax expense (benefit) on the pre-tax income (loss) and the actual income tax expenses

(Loss)/profit before taxes on income
Statutory tax rate
Tax computed at the statutory tax rate

Increase (decrease) in tax in respect of:
Elimination of tax calculated in respect of the Group’s share in losses of associated companies
Income subject to tax at a different tax rate
Non-deductible expenses
Tax in respect of foreign dividend
Exempt income (a)
Taxes in respect of prior years
Impact of change in tax rate
Changes in temporary differences in respect of which deferred taxes are not recognized
Tax losses and other tax benefits for the period regarding which deferred taxes were not recorded
Differences between the measurement base of income reported for tax purposes and the income reported in the financial
statements
Other differences
Taxes on income included in the statement of profit and loss

2016

For the Year Ended December 31
2015
$ thousands

2014

(334,668)  
17.00% 
(56,893)  

31,463 
25,859 
49,715 
— 
(754)  
331 
6,857 
1,419 
4,415 

(1,421)  
(1,657)  
59,334 

158,270 

17.00% 
26,906 

52,148 
(3,209)  
7,818 
— 

(41,160)  
(294)  
— 
580 
8,335 

12,133 

(879)  

62,378 

109,274 

26.50%
28,958 

45,288 
12,846 
8,442 
8,047 
(21,145)
(1,518)
(3,131)
(3,795)
16,183 

12,519 
647 
103,341 

(a)

$754 thousand of exempt income effect in Amayo II in Nicaragua in 2016 ($5 million in 2015 and $219 thousand in 2014 including Amayo I and II). $36 million and $21 million of exempt income
effect related to gain in distribution of dividend in kind and gain on bargain purchase in 2015 and 2014 respectively.

F - 104

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 26 – Income Taxes (Cont’d)

C. Deferred tax assets and liabilities

1. Deferred tax assets and liabilities recognized

The deferred taxes are calculated based on the tax rate expected to apply at the time of the reversal as detailed below. Deferred taxes in respect of subsidiaries were calculated based on the tax rates
relevant for each country.

The deferred tax assets and liabilities are derived from the following items:

Balance of deferred tax asset (liability) as at January 1, 2015
Changes recorded on the statement of profit and loss
Changes recorded to equity reserve
Translation differences
Changes in respect of business combinations
Balance of deferred tax asset (liability) as at December 31, 2015

Changes recorded on the statement of profit and loss
Changes recorded to equity reserve
Translation differences
Impact of change in tax rate
Changes in respect of business combinations
Balance of deferred tax asset (liability) as at December 31, 2016

Property plant and
equipment

Employee
benefits

Carryforward of
losses and
deductions for tax
purposes
$ thousands

(126,749)  
2,429 
— 
352 
— 

(123,968)  

(48,212)  

— 
(1,495)  
7,638 
(41,456)  
(207,493)  

824 
(222)  
— 
(1)  
— 
601 

286 
61 
15 
— 
748 
1,711 

46,771 
15,325 
— 
(153)  
— 
61,943 

28,014 
— 
398 
(5,620)  
— 
84,735 

 2.

The deferred taxes are presented in the statements of financial position as follows:

As part of non-current assets
As part of non-current liabilities

Other

Total

(27,113)  
(50,695)  
3,081 
885 
(124)  
(73,966)  

1,741 
(5,249)  
791 
(8,875)  
6,355 
(79,203)  

(106,267)
(33,163)
3,081 
1,083 
(124)
(135,390)

(18,171)
(5,188)
(291)
(6,857)
(34,353)
(200,250)

As at December 31

2016

2015

$ thousands

25,104 
(225,354)  
(200,250)  

2,693 
(138,083)
(135,390)

Income tax rate in Israel is 25% and 26.5% for the years ended December 31, 2016 and December 31, 2015 and 2014, respectively.

On January  4, 2016, Amendment  216 to the  Income  Tax  Ordinance  (New Version)  – 1961 (hereinafter  – “the  Ordinance”)  was  passed  in the  Knesset. As part  of the  amendment,  OPC’s and
Hadera’s  income  tax  rate  was  reduced  by  1.5%  to  a  rate  of  25%  as  from  2016.  Furthermore,  on  December  22,  2016  the  Knesset  plenum  passed  the  Economic  Efficiency  Law  (Legislative
Amendments for Achieving Budget Objectives in the Years 2017 and 2018) – 2016, by which, inter alia, the corporate tax rate would be reduced from 25% to 23% in two steps. The first step will
be to a rate of 24% as from January 2017 and the second step will be to a rate of 23% as from January 2018.

F - 105

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 26 – Income Taxes (Cont’d)

Current income tax from operations in El Salvador includes income tax from the consolidation of Nejapa Power Branch and Cenergica. Income tax rate in El Salvador is 30% for the years ended
December 31, 2015, 2014 and 2013. In addition, a 5% to 25% withholding tax is applicable depending on whether the payments are to countries with preferential tax regimes or nil taxes. Currently,
Nejapa´s and Cenergica´s parent company is domiciliated in Panama and therefore is subject to 5% withholding tax.

In the Dominic Republic, CEPP was subject to the greater of 27%, 28% and  29% income tax rate on taxable income in 2015, 2014 and 2013, or 1% of taxable assets. During 2015, 2014, and 2013
CEPP qualified to pay income tax on the basis of taxable income; and a 10% withholding tax on dividend distribution.

In Bolivia, I.C. Power has 25% income tax and a 12.5% withholding tax on the Bolivian branch profits credited to the shareholder.

In December 2014, a tax reform Law was enacted in Peru. Among other changes, the Law decreases corporate income tax rates and increases withholding tax rates on dividends. The corporate
income tax rate will reduce from 30% in 2014 to: 28%, in 2015 and 2016, to 27%, in 2017 and 2018 and to 26% starting 2019. The withholding tax rates will increase from 4.1% in 2014 to: 6.8% in
2015 and 2016, 8.0% in 2017 and 2018; and 9.3% starting 2019. Kallpa, CDA and Samay I have signed tax stability agreements that expire in 2020, 2022 and 2024, respectively. Only after these
tax agreements expire, Kallpa, CDA and Samay I will be affected by the changes in income tax and withholding tax rates described above. On December 27, 2016, Kallpa waived to its tax stability
agreement that originally expired in 2020. In December 2016, a new tax reform was enacted, which among other items, supersedes the changes introduced in 2014 related to the corporate income
tax and withholding tax rates. Effectively on January 01, 2017 onwards, the corporate income tax and withholding tax rates in Peru will be 29.5% and 5% respectively.

In September 2014, a tax reform in Chile was enacted, which makes substantial changes to the Chilean tax system, including two alternative mechanisms for computing shareholder-level income
taxation beginning on January 1, 2017 (accrued income and cash-basis methods), additional corporate tax rate increases, and other substantial modifications. The selection should be made before
the end of 2016 and remains in effect for 5 years.

As a result, the corporate income tax rate increased gradually from 20% in 2013 to: 21% in 2014; 22.5% in 2015; and it will increase to 24% in 2016; and 25% in 2017 for shareholders on the
accrued income method, and 25.5% in 2017 for shareholders on the cash-basis method. Starting 2018 onwards, the income tax rate will be 25% for shareholders on the accrued income method and
27% for shareholders on the cash-basis method.

In January 2016, a new tax reform was enacted that simplifies the tax reformed published in September 2014. Some types of tax payers are restricted to one of the two regimes, but tax payers
eligible for either regime must opt into their preferred regime before December 31, 2016. Cardones and Colmito elected the cash-basis method.

Under the corporate income tax rules, applicable until the end of 2016, business income in Chile is subject to a 24% corporate income tax rate, but such income also is subject to income tax on a
cash basis when distributed to the shareholders, at rates that vary depending on whether the shareholder is a resident or a nonresident. Nonresident shareholder are subject to a 35% withholding tax
on  dividends.  The  corporate  tax  paid  may  be  used  as  a  credit  against  the  liability  of  the  shareholders,  resulting  in  an  overall  income  tax  rate  of  35%  on  distributed  profits  for  nonresident
shareholders.

Starting in 2017, Chilean taxpayers subject to corporate income tax will be subject to one of the following two tax regimes:

• The fully integrated regime, under which shareholders will be taxed on their share of the profits that area accrued annually by Chilean entity. The combined income tax rate under the regime

will be 35%.

• The partially integrated regime, under which shareholders will be taxed when profits are distributed. The combined income tax rate under the regime generally will be 44.45%; however, foreign

shareholders that are resident in a country that has concluded a tax treaty with Chile will be entitled to a full tax credit, and thus may benefit from a combined rate of 35%.

In  Nicaragua,  Empresa  Energética  Corinto  and  Tipitapa  Power  Company  are  subject  to  25%  income  tax,  based  on  a  Foreign  Investment  Agreement  signed  in  June  2000,  which  protect  the
companies from any unfavorable changes in the tax Law. In addition, Consorcio Eólico Amayo S.A and Consorcio Eólico Amayo Fase II, are tax exempt from income tax payments up to a period
of seven years since the beginning of operations of the plants, in accordance with Law No.532 for Electric. I.C. Power Generation with Renewable Sources Incentive. In addition, a 10% to 17%
withholding tax is applicable depending on whether the payments are to countries with preferential tax regimes or nil taxes.

In Guatemala, PQP   DEOCSA, DEORSA and Guatemel, were subjected to 25% income tax rate in 2016 and 2015. Proposed to raise to 28% in future subject to passing of Bill. Recsa is subjected
to a 7% income tax rate over its income. A 5% withholding tax applies on dividend distributions.

F - 106

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 26 – Income Taxes (Cont’d)

In January 2013, a tax reform was enacted in Colombia, which established an income tax rate of 25%, except for those contributors that by express disposition handle special rates, not less than 3%
of  the  net  worth  of  the  shareholders  ‘equity  on  the  last  day  of  the  immediately  previous  taxable  period.  In  addition,  a  9%  equity  income  tax  (CREE)  was  created  as  a  contribution  to  generate
employment  and  social  investment.  During  December  2016,  the  CREE  rate  was  blended  within  the  corporate  income  tax  rate,  which  implied  a  hike  to  34%  for  2017  and  33%  for  2018  and
subsequent  years.  In addition,  taxpayers  reporting  taxable  income  higher than $800 million  (Colombian  pesos) will pay an additional  6% and 4% income  tax rate  for the years 2017 and 2018,
respectively.

In Singapore, under its one-tier corporate taxation system, profits are taxed at the corporate level at 17% and this is a final tax. Dividends paid by a Singapore resident company under the one-tier
corporate tax system should not be taxable.

A Company is liable to pay tax in Singapore on income that is:

· Accrued in or derived from Singapore; or

·

Received in Singapore from outside of Singapore.

Certain categories of foreign sourced income including,

·

·

·

·

dividend income; 

trade or business profits of a foreign branch; or 

service fee income derived from a business, trade or

profession carried on through a fixed place of operation in a foreign jurisdiction.

may be exempted from tax in Singapore.

Tax exemption should be granted when all of the three conditions below are met:

1. The highest corporate tax rate (headline tax rate) of the foreign jurisdiction from which the income is received is at least 15% at the time the foreign income is received in Singapore;

2. The foreign income had been subjected to tax in the foreign jurisdiction from which they were received (known as the "subject to tax" condition). The rate at which the foreign income was taxed

can be different from the headline tax rate; and

3. The Tax Comptroller is satisfied that the tax exemption would be beneficial to the person resident in Singapore.

The Comptroller will regard the "subject to tax" condition as having met if the income is exempt from tax in the foreign jurisdiction due to tax incentive granted for substantive business activities
carried out in that jurisdiction.

Extension of safe habour under Singapore Budget 2016

Singapore does not impose taxes on disposal gains, which are considered to be capital in nature, but imposes tax on income and gains of a trading nature. As such, whenever a gain is realized on the
disposal of an asset, the practice of the IRAS is to rely upon a set of commonly-applied rules in determining the question of capital (not taxable) or revenue (taxable). Under Singapore tax laws, any
gains derived by a divesting company from its disposal of ordinary shares in an investee company between June 1, 2012 and May 31, 2022 (extended from May 31, 2017 to May 31, 2022) are
generally not taxable if, immediately prior to the date of such disposal, the divesting company has held at least 20% of the ordinary shares in the investee company for a continuous period of at least
24 months.

Deferred tax liability on undistributed earnings

Subsidiaries  pay  dividends  on  quarterly  basis  as  long  as  they  are  in  compliance  with  covenants  derived  from  the  borrowings  agreements  described  in  Note  15.  Deferred  tax  is  recognized  for
temporary differences related to undistributed earnings in subsidiaries that will reverse it in the foreseeable future. During 2016, the Group recorded an expense of $1 million in relation to this
timing difference ($3 million in 2015).

Distributions  of  the  earnings  of  foreign  subsidiaries  are  subject  to  the  withholding  taxes  imposed  by  the  foreign  subsidiaries´  jurisdictions  of  incorporation.  I.C.Power  does  not  have  funds
designated for, or subject to, permanent reinvestment in any country in which it operates.

F - 107

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 27 – Earnings per Share

Data used in calculation of the basic / diluted earnings per share

A.

(Loss)/income allocated to the holders of the ordinary shareholders

(Loss)/Income for the year attributable to Kenon’s shareholders

(411,937)  

72,992 

(Loss)/Income for the year from discontinued operations (after tax)
Less: NCI
(Loss)/Income for the year from discontinued operations (after tax) attributable to Kenon’s shareholders

— 
— 
— 

— 
— 
— 

(Loss)/Income for the year from continuing operations attributable to Kenon’s shareholders

(411,937)  

72,992 

458,161 

470,421 
(3,495)
466,926 

(8,765)

B. Number of ordinary shares

2016

For the Year Ended December 31
2015
$ thousands

2014

Weighted Average number of shares used in calculation of basic / diluted earnings per share

F - 108

For the Year Ended December 31

2016

2015

('000)

53,720 

53,649 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 28 – Discontinued Operations

(a) ZIM

Upon completion of the debt arrangement in ZIM, on July 16, 2014, Kenon declined to a rate of holdings of 32% of ZIM’s equity and as a result it ceased to control ZIM. Commencing from this
date, Kenon presents its investment in ZIM as an associated company (for details with respect to the debt arrangement – see Note 10.C.a.1. above). ZIM’s results up to the completion date of the
debt  arrangement,  together  with  the  income  due  to  loss  of  control  and  the  loss  due  to  waiving  all  ZIM’s  debts,  were  presented  separately  in  the  statements  of  profit  and  loss  in  the  category
“profit/(loss) for the year from discontinued operations”.

Set forth below are the results attributable to the discontinued operations

Sales
Cost of sales
Gross profit (loss)
Operating loss

Loss before taxes on income
Taxes on income
Loss after taxes on income
Income from realization of discontinued operations
Income (loss) for the period from discontinued operations

Net cash flows provided by operating activities
Net cash flows provided by (used in) investing activities
Net cash flows used in financing activities
Impact of fluctuations in the currency exchange rate on the balances of cash and cash equivalents
Cash and cash equivalents used in discontinued operations

(b) Petrotec AG

Six Months
Ended June 30,
2014
$ thousands

1,741,652 
(1,681,333)
60,319 
(17,694)

(119,168)
(9,735)
(128,903)
608,603 
479,700 

41,031 
(24,104)
(28,480)
(801)
(12,354)

In December 2014, ICG sold its equity interest (69%) in Petrotec, ICG received shares of REG, a NASDAQ-listed entity. Petrotec’s results up to the completion date of the sale, together with the
loss from the sale were presented separately in the statements of profit and loss in the category “profit/(loss) for the year from discontinued operations”.

Set forth below are the results attributable to the discontinued operations

Sales
Expenses
Operating results before taxes on sales
Taxes on sales
Results after taxes
Loss from realisation of discontinued operation
Income (loss) for the period from discontinued operations

Net cash flows provided by operating activities
Net cash flows used in investing activities
Net cash flows used in financing activities
Impact of fluctuations in the currency exchange rate on the  balances of cash and cash equivalents
Cash and cash equivalents used in discontinued operations

Year Ended
December 31,
2014
$ thousands

221,791 
(226,323)
(4,532)
252 
(4,280)
(4,999)
(9,279)

15,214 
(3,263)
(8,644)
(1,753)
1,554 

In addition to the cash, ICG received shares of Renewable Energy Group Ltd (“REG”) in value of $18 million. ICG is subject to a lock-up restriction with respect to the REG shares.

F - 109

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 29 – Segment, Customer and Geographic Information

A. General

During 2016, the Group increased from two to three reportable segments as a result of 2016 acquisition described in Note 11.A.1.a.

The following summary describes the Group’s reportable segments in 2016:

1.

2.

I.C. Power Generation - I.C. Power through its subsidiary companies, is engaged in the production, operation and sale of electricity in countries in Latin America, the Caribbean region
and Israel. It also is engaged in the construction and operation of power stations in Latin America.

I.C. Power Distribution - I.C. Power through its subsidiary companies, is engaged in the distribution of electricity in Guatemala (This segment does not exist in 2015 and 2014 because
it was acquired in 2016).

3. Qoros Automotive – A China-based automotive company that is jointly-owned with a subsidiary of Wuhu Chery, a state controlled holding enterprise and large Chinese automobile

manufacturing company.

There were no intersegment sales in 2016.

B.

Information regarding reportable segments

Financial information of the reportable segments is set forth in the following table.

2016
Total sales

Adjusted EBITDA
Depreciation and amortization
Financing income
Financing expenses
Other items:
Share in losses/(income) of associated companies
Provision of financial guarantee
Impairment of investments

Income/(loss) before taxes
Income Taxes
Income/(loss) from continuing operations

Segment assets
Investments in associated companies

Segment liabilities
Capital expenditure

*   

 Associated Company – See Note 10.A.2, 10.C.b.

I.C. Power
Generation

I.C. Power
Distribution

1,365,229 

508,628 

343,130 
157,070 
(10,246)  
166,079 

(623)  
— 
— 
312,280 
30,850 
45,177 
(14,327)  

4,217,341 
8,897 

3,462,243 
261,616 

77,281 
14,782 
(4,000)  
19,034 

— 
— 
— 
29,816 
47,465 
12,471 
34,994 

599,809 
— 

542,223 
28,174 

F - 110

Qoros*

Other

Adjustments

Total

$ thousands

— 

— 
— 
— 
— 

142,534 
— 
— 
142,534 
(142,534)  

— 

(142,534)  

— 
117,593 

— 
— 

65 

— 

1,873,922 

(23,532)  
529 
(16,580)  
16,831 

43,681 
130,193 
72,263 
246,917 
(270,449)  
1,686 
(272,135)  

112,410 
81,743 

239,123 
49 

— 
— 
12,345 
(12,345)  

— 
— 
— 
— 
— 
— 
— 

— 
— 

— 
— 

396,879 
172,381 
(18,481)
189,599 

185,592 
130,193 
72,263 
731,547 
(334,668)
59,334 
(394,002)

4,929,560 
208,233 
5,137,793 
4,243,589 
289,839 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 29 – Segment, Customer and Geographic Information (Cont’d)

I.C. Power

Qoros*

Other
$ thousands

Adjustments

Total

2015
Sales to external customers
Inter-segment sales

Elimination of inter-segment sales
Total sales

Adjusted EBITDA
Depreciation and amortization
Financing income
Financing expenses
Other items:
Share in losses/(income) of associated companies
Gain from distribution of dividend in kind

Asset impairment

Income/(loss) before taxes
Income Taxes
Income/(loss) from continuing operations

Segment assets
Investments in associated companies

Segment liabilities
Capital expenditure

2014
Sales to external customers
Inter-segment sales

Elimination of inter-segment sales
Total sales

Adjusted EBITDA
Depreciation and amortization
Financing income
Financing expenses
Other items:
Share in losses/(income) of associated companies
Asset impairment
Gain from disposal of investee
Gain on bargain purchase

Income/(loss) before taxes
Income Taxes
Income/(loss) from continuing operations

Segment assets
Investments in associated companies

Segment liabilities
Capital expenditure

1,283,624 
5,115 
1,288,739 

(5,115)  

1,283,624 

372,356 
119,427 
(10,684)  
114,713 

(274)  

— 
— 
223,182 
149,174 
62,353 
86,821 

4,068,951 

8,993 

3,062,580 
532,544 

1,358,174 
14,056 
1,372,230 

(14,056)  

1,358,174 

347,937 
108,413 

(8,858)  

131,883 

(13,542)  
34,673 
(157,137)  
(68,210)  
27,222 
320,715 
98,854 
221,861 

3,832,012 
9,625 

2,860,358 
592,388 

F - 111

— 
— 
— 
— 
— 

— 
— 
— 
— 

196,223 

— 
— 
196,223 
(196,223)  

— 

(196,223)  

— 

158,729 

— 
— 

— 
— 
— 
— 
— 

— 
— 
— 
— 

174,806 
— 
— 
— 
174,806 
(174,806)  

— 

(174,806)  

— 
221,038 

— 
— 

329 
861 
1,190 
(861)  
329 

367 
620 
(2,728)  
9,515 

(9,190)  

(209,710)  
6,541 
(204,952)  
205,319 
25 
205,294 

44,804 

201,300 

156,642 
138 

— 
— 
— 
— 
— 

(43,175)  
(255)  
(38,622)  
9,533 

9,633 
13,171 
— 
— 
(6,540)  
(36,635)  
4,487 
(41,122)  

836,596 
205,120 

806,335 
12,377 

— 
— 
— 
5,115 
5,115 

— 
— 
— 
— 

— 

— 
— 
— 
— 
— 
— 

— 

— 

— 
— 

— 
— 
— 
14,056 
14,056 

— 
— 
31,237 
(31,237)  

— 
— 
— 
— 
— 
— 
— 
— 

(784,688)  

— 

(784,688)  

— 

1,283,953 
5,976 
1,289,929 
(861)
1,289,068 

372,723 
120,047 
(13,412)
124,228 

186,759 

(209,710)
6,541 
214,453 
158,270 
62,378 
95,892 

4,113,755 

369,022 
4,482,777 
3,219,222 
532,682 

1,358,174 
14,056 
1,372,230 
— 
1,372,230 

304,762 
108,158 
(16,243)
110,179 

170,897 
47,844 
(157,137)
(68,210)
195,488 
109,274 
103,341 
5,933 

3,883,920 
435,783 
4,319,703 
2,882,005 
604,765 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 29 – Segment, Customer and Geographic Information (Cont’d)

C. Customer and Geographic Information

Major customers

In 2016, 2015 and 2014, the Group does not have any customers with revenue that constituted 10 percent or more to total consolidated revenue nor material intersegment revenue for the year.

Information based on geographic areas

The Group’s geographic revenues are as follows:

Peru
Guatemala
Israel
Others
Total revenues

The Group’s non-current assets* on the basis of geographic location:

Peru
Guatemala
Israel
Others
Total non-current assets

* Composed of property, plant and equipment and intangible assets.

Note 30 – Related-party Information

A. Identity of related parties:

2016

For the year ended December 31
2015
$ thousands

2014

528,121 
570,510 
356,465 
418,826 
1,873,922 

447,679 
108,440 
326,061 
406,888 
1,289,068 

436,673 
33,000 
413,578 
488,979 
1,372,230 

As at December 31

2016

2015

$ thousands

1,910,421 
682,985 
495,639 
785,033 
3,874,078 

1,803,233 
46,720 
456,456 
800,713 
3,107,122 

The Group’s related parties are as defined in IAS 24 – Related Party Disclosures and included: Kenon’s beneficial owners and Kenon’s subsidiaries, affiliates and associates companies.

In the ordinary course of business, some of the Group’s subsidiaries and affiliates engage in business activities with each other.

Ordinary course of business transactions are aggregated in this Note. Other than disclosed elsewhere in the consolidated financial statements during the period, the Group engaged the following
material related party transactions.

Key management personnel of the Company are those persons having the authority and responsibility for planning, directing and controlling the activities of the Company. The directors, chief
executive officer, chief financial officer, general counsel and vice president of business development, are considered as key management personnel of the Company.

F - 112

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 30 – Related-party Information (Cont’d)

B. Transactions with directors and officers (Kenon's directors and officers):

B. Key management personnel compensation

Short-term benefits

Share-based payments

C. Transactions with related parties (excluding associates):

Sales from shipping*

Sales of electricity

Operating expenses of voyages and services*

Administrative expenses

Other income, net

Financing expenses, net

* Presented under discontinued operations.

D. Transactions with associates:

Sales of electricity

Operating expenses

Other income, net

F - 113

2016

2015

$ thousands

4,352 
547 
4,899 

4,113 
556 
4,669 

2016

For the year ended December 31
2015
$ thousands

2014

— 

148,119 

— 

614 

— 

— 

135,655 

— 

329 

— 

14,475 

10,716 

7,138 

124,636 

37,511 

2,000 

33 

17,443 

2016

For the year ended December 31
2015
$ thousands

2014

— 

— 

178 

5,115 

204 

95 

14,056 

— 

— 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 30 – Related-party Information (Cont’d)

E. Balances with related parties:

Cash and short-term deposit

Trade receivables

Loans and Other Liabilities
In US dollar or linked thereto

Weighted-average interest rates (%)

In CPI-linked Israeli currency

Weighted-average interest rates (%)

Repayment years
Current maturities
Second year
Third year
Fourth year
Fifth year
Sixth year and thereafter

Ansonia

As at December
2016
Other related
parties *
$ thousands

Total

Bank Leumi
Group

As at December 31
2015
Other related
parties *
$ thousands

2,462 

12,245 

268,706 

6.62% 

— 

— 

— 

— 

45,735 

6.00% 

— 

— 

— 
45,735 
— 
— 
— 
— 
45,735 

2,462 

12,245 

222,971 

7.24% 

— 

— 

— 
— 
— 
— 
— 
222,971 
222,971 

190,629 

— 

— 

— 

41,677 

4.94% 

1,833 
2,218 
2,353 
1,888 
2,610 
30,775 
41,677 

7,148 

13,462 

118,497 

6.68% 

— 

— 

— 
— 
— 
— 
— 
118,497 
118,497 

Total

197,777 

13,462 

118,497 

6.68%

41,677 

4.94%

* IC, Israel Chemicals Ltd (“ICL”), Oil Refineries Ltd (“ORL”).

These balances relate to amounts with entities that are related to Kenon's beneficial owners.

F. Regarding the ZIM's restructuring and IC’s part in the restructuring, see Note 10.C.a.

G. Regarding the convertible loan from Ansonia to Quantum, see Note 10.C.b.5

H. Gas Sale Agreement with ORL, see Note 20.B.h.

I. The separation agreement

The  following  summarizes  the  material  provisions  of  the  Separation  and  Distribution  Agreement  between  Kenon  and  IC  in  relation  to  the  consummation  of  the  spin-off.  The  Separation  and
Distribution Agreement sets forth, among other things, Kenon agreements with IC in respect of the principal transactions which separated Kenon's businesses from IC and its other businesses. The
Separation and Distribution Agreement also sets forth other agreements that govern the distribution, as well as certain aspects of our relationship with IC after the consummation of the spin-off.
See Note 1.B for transactions between Kenon and IC since the spin-off.

Transfer of Assets and Assumption of Liabilities

The Separation and Distribution Agreement identified the assets to be transferred, the liabilities to be retained by IC or assumed by Kenon, and the contracts to be retained by IC or assigned to
Kenon in relation to the spin-off and transfer of IC’s interests, direct or indirect, in each of I.C. Power, Quantum (the holder of IC’s 50% equity interest in Qoros), ZIM, Tower and ICG to Kenon.

Concurrent with the transfer of the aforementioned businesses to Kenon, IC assigned and transferred to Kenon, IC’s full rights and obligations according to, and in relation to, certain loans it has
provided to, and certain undertakings it had made in respect of, these businesses. Set forth below is a summary of the material rights and obligation that IC transferred to Kenon in relation to the
spin-off:  

F - 114

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
Note 30 – Related-party Information (Cont’d)

Business

Instrument

Outstanding Amount as of 
December 31, 2014

Qoros

I.C. Green

  Capital note issued by Quantum to IC

$626 million

Financial Instruments

  Capital note issued by ICG to IC

Loan borrowed by ICG

  NIS 508 million (approximately $131 million)
22 million Euro (approximately $27 million)

Qoros

Shareholder loan to be provided to Qoros

In February 2015, Kenon provided RMB400 million (approximately $65
million) as a shareholder loan to Qoros, subject to the release of IC’s back-
to-back guarantees in respect of certain of Qoros’ indebtedness.

Additionally,  certain  guarantees  and  undertakings  made  by  IC  in  relation  to  OPC’s  financing  agreement  shall  not  be  transferred  to  Kenon  and,  instead,  have  been  replaced  with  guarantees  or
undertakings of I.C. Power, as well as a provision of cash collateral, so that IC is released from its obligations under the existing guarantee or undertaking, as applicable.

Representations and Warranties

Other than certain limited corporate representations and warranties made by Kenon and IC, neither Kenon nor IC make any representations or warranties regarding any assets or liabilities transferred
or assumed, any consents or approvals that may be required in relation to such transfers or assumptions, the value or freedom from any lien or other security interest of any assets transferred, the
absence  of  any  defenses  relating  to  any  claim  of  either  party  or  the  legal  sufficiency  of  any  conveyance  documents,  or  any  other  matters.  Except  as  expressly  set  forth  in  the  Separation  and
Distribution Agreement or in any ancillary agreement, all assets were transferred on an “as is,” “where is” basis.

Termination

The Separation and Distribution Agreement provides that it may be terminated by IC at any time in its sole discretion prior to the consummation of the spin-off.

Release of Claims

Except with respect to (i) those legal proceedings pending against IC at the time of the consummation of the spin-off, and that relate to any of the businesses to be transferred to Kenon, and (ii) certain
other exceptions set forth in the Separation and Distribution Agreement, Kenon shall be liable for the claims of each of the businesses being transferred to it as part of the spin-off, including such
claims that arose out of, or relate to events, circumstances or actions occurring or failing to occur, or with respect to any conditions existing prior to, the distribution date.

  Indemnification

Kenon and IC agree to indemnify each other against certain liabilities incurred in relation to Kenon respective businesses, and as otherwise allocated to each of us in the Separation and Distribution
Agreement.  These  indemnities  are  principally  designed  to  place  financial  responsibility  for  the  obligations  and  liabilities  of  our  business,  and  each  of  our  businesses,  with  us  and  financial
responsibility for the obligations and liabilities of IC and its business with IC. The Separation and Distribution Agreement also specifies procedures with respect to claims subject to indemnification
and related matters.

Legal Matters

Kenon agrees to indemnify IC for any liabilities arising after the consummation of the spin-off as a result of legal matters relating to the businesses Kenon will receive in the spin-off.

Allocation of Spin-Off Expenses

The Separation and Distribution Agreement provides that IC will be responsible for all fees, costs and expenses relating to it and will finance all fees, costs and expenses related to Kenon, in each
case as incurred prior to the distribution date in relation to the spin-off.

F - 115

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 30 – Related-party Information (Cont’d)

Other Matters Governed by the Distribution Agreement

Other  matters  governed  by  the  Separation  and  Distribution  Agreement  include  access  to  financial  and  other  information,  access  to  and  provision  of  records,  intellectual  property,  confidentiality,
treatment of outstanding guarantees and similar credit support and dispute resolution procedures.

Conditions

The Separation and Distribution Agreement provides that the distribution of our ordinary shares is subject to several conditions that must be satisfied or waived prior to the distribution. Each of IC
and Kenon may, in their sole discretion, waive the conditions precedent applicable to their entry into the Separation and Distribution Agreement. IC may, in its sole discretion, at any time prior to the
record date of the distribution, decide to abandon the distribution.

Major Shareholders

Beneficial Owner (Name/Address)

Ansonia Holdings Singapore B.V. 1 *
XT Investments Ltd. 2
Directors and Executive Officers 3

Ordinary Shares Owned
31,156,869
 5,727,128
           —

Percentage of Ordinary Shares
58.0%
10.7%
      —

1. Based solely on the Schedule 13 D/A (Amendment No. 4) filed by Ansonia Holdings Singapore B.V. with the SEC on January 25, 2017. A discretionary trust, in which Mr. Idan Ofer is the prime

beneficiary, indirectly holds 100% of Ansonia Holdings Singapore B.V.

2. Based solely upon the Schedule 13 D/A (Amendment No. 1) filed by XT Investments Ltd. and XT Holdings Ltd. with the SEC on January 12, 2016. XT Investments Ltd. is a direct wholly-owned

subsidiary of XT Holdings Ltd., of which each of Orona Investments Ltd. and Lynav Holdings Ltd. is the direct owner of 50% of the outstanding ordinary shares. Orona Investments Ltd. is indirectly
controlled by Mr. Ehud Angel. Lynav Holdings Ltd. is controlled by a discretionary trust in which Mr. Idan Ofer is a prime beneficiary.

3. Each individual beneficially owns less than 1% of Kenon’s ordinary shares.

* Ansonia Holdings Singapore B.V. is the parent company of Kenon.

F - 116

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments

A. General

The Group has extensive international activity in which it is exposed to credit, liquidity and market risks (including currency, interest, inflation and other price risks). In order to reduce the exposure
to these risks, the Group holds derivative financial instruments, (including forward transactions, interest rate swap (“SWAP”) transactions, and options) for the purpose of economic (not accounting)
hedging of foreign currency risks, inflation risks, commodity price risks, interest risks and risks relating to the price of inputs. Furthermore, I.C. Power holds derivative financial instruments to hedge
its risk in respect of changes in the cash flows of issued bonds, and such instruments are accounting hedges.

This note presents information about the Group’s exposure to each of the above risks, and the Group’s objectives, policies and processes for measuring and managing the risk.

The risk management of the Group companies is executed by them as part of the ongoing current management of the companies. The Group companies monitor the above risks on a regular basis. The
hedge policies with respect to all the different types of exposures are discussed by the boards of directors of the companies.

The comprehensive responsibility for establishing the base for the risk management of the Group and for supervising its implementation lies with the Board of Directors and the senior management of
the Group.

B. Credit risk

Counterparty credit risk is the risk that the financial benefits of contracts with a specific counterparty will be lost if a counterparty defaults on their obligations under the contract. This includes any
cash amounts owed to the Group by those counterparties, less any amounts owed to the counterparty by the Group where a legal right of set-offs exist and also includes the fair values of contracts
with  individual  counterparties  which  are  included  in  the  financial  statements.  The  maximum  exposure  to  credit  risk  at  each  reporting  date  is  the  carrying  value  of  each  class  of  financial  assets
mentioned in this note.   

(1)

Exposure to credit risk

The carrying amount of financial assets represents the maximum credit exposure. The maximum exposure to credit risk at the reporting date was:

Cash and cash equivalents
Short term Deposits and restricted cash
Trade receivables
Long-term trade receivables
Other current assets
Deposits and other long-term receivables including derivative instruments

The maximum exposure to credit risk for trade receivables, as of the date of the report, by geographic region was as follows:  

Israel
South America
Central America
Other regions

F - 117

As at December 31

2016

2015

$ thousands
Carrying amount
326,635 
89,545 
284,532 
10,120 
28,462 
66,434 
805,728 

383,953 
308,702 
123,273 
- 
12,339 
40,993 
869,260 

As at December 31

2016

2015

$ thousands

34,779 
93,293 
155,142 
11,438 
294,652 

31,306 
53,325 
33,361 
5,281 
123,273 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
Note 31 – Financial Instruments (Cont’d)

(2)

Aging of debts and impairment losses

Set forth below is an aging of the trade receivables:

Not past due
Past due up to 3 months
Past due 3 – 6 months
Past due 6 – 9 months
Past due 9 – 12 months

Past due more than one year

For which
impairment
was not
recorded 

233,787 
50,723 
9,160 
83 

652 
247 
294,652 

As at December 31, 2016

As at December 31, 2015

For which
impairment
was recorded

Gross
$ thousands

Impairment

For which
 impairment
was not
recorded 

For which
 impairment
was not recorded

Gross
$ thousands

Impairment

(8)  
— 
(282)  
— 

— 
(4,714)  
(5,004)  

109,502 
12,210 
301 
101 

932 
227 
123,273 

— 

— 
— 

— 
104 
104 

— 
— 
— 
— 

— 
(104)
(104)

8 
— 
282 
— 

— 
4,714 
5,004 

F - 118

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

C. Liquidity risk

Liquidity risk is the risk that the Group will not be able to meet its financial obligations as they fall due. The Group’s approach to managing liquidity is to ensure, as far as possible, that it will always
have  sufficient  liquidity  to  meet  its  liabilities  when  due,  under  both  normal  and  adverse  credit  and  market  conditions,  without  incurring  unacceptable  losses  or  risking  damage  to  the  Group’s
reputation.

The Group manages its liquidity risk by means of holding cash balances, short-term deposits, other liquid financial assets and credit lines.

As of December 31, 2016, the Group has a negative working capital on a consolidated basis mainly due to I.C. Power’s negative working capital. I.C. Power may seek to extend the final maturity of
or  refinance  its  indebtedness.  The  management  believes  that  they  will  have  sufficient  cash  resources  from  operating  cashflows  and  refinance  of  long-term  borrowings  that  matures  in  2017,  if
necessary, to meet its financial obligations as and when they fall due.

Set forth below are the anticipated repayment dates of the financial liabilities, including an estimate of the interest payments. This disclosure does not include amounts regarding which there are
offset agreements:

Non-derivative financial liabilities
Loans from banks and others *
Trade payables
Other payables
Non-convertible debentures **
Loans from banks and others **
Liabilities in respect of financing lease
Financial guarantee ***

Financial liabilities – hedging instruments
Interest SWAP contracts
Forward exchange rate contracts

Financial liabilities not for hedging
Interest SWAP contracts and options
Derivatives from debt restructure

Book value

Projected cash
flows

Up to 1 year

1-2 years

2-5 years

  More than 5 years  

$ thousands

As at December 31, 2016     

213,417 
285,612 
160,540 
867,287 
2,143,499 
88,169 
118,763 

22,865 
2,399 

2,125 
29,594 
3,934,270 

219,651 
285,612 
160,540 
1,190,032 
2,756,851 
114,069 
118,763 

22,865 
2,399 

2,125 
29,594 
4,902,501 

219,651 
285,612 
59,650 
58,113 
340,684 
13,013 
118,763 

9,930 
1,627 

783 
- 
1,107,826 

- 
- 
10,121 
57,217 
244,508 
12,171 
- 

5,788 
772 

570 
29,594 
360,741 

- 
- 
21,718 
616,765 
977,251 
57,432 
- 

4,192 
- 

688 
- 
1,678,046 

- 
- 
69,051 
457,937 
1,194,408 
31,453 
- 

2,955 
- 

84 
- 
1,755,888 

*       Excludes current portion of long-term liabilities and long-term liabilities which were classified to short-term.
**
Includes current portion of long-term liabilities and long-term liabilities which were classified to short-term.
*** Financial Guarantees contractual period in Qoros is dependent on Qoros’s timeliness to meet the obligation of current loans payable.

F - 119

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

Non-derivative financial liabilities
Loans from banks and others *
Trade payables
Other payables
Non-convertible debentures **
Loans from banks and others **
Liabilities in respect of financing lease
Financial guarantee ***

Financial liabilities – hedging instruments
Interest SWAP contracts
Forward exchange rate contracts

Financial liabilities not for hedging
Interest SWAP contracts and options

Book value

Projected cash
flows

Up to 1 year

1-2 years

2-5 years

  More than 5 years  

$ thousands

As at December 31, 2015

179,317 
145,454 
87,572 
671,247 
1,668,977 
163,774 
34,263 

44,059 
850 

187,484 
145,454 
87,572 
951,308 
2,331,220 
201,929 
179,073 

44,059 
850 

3,276 
2,998,789 

3,276 
4,132,225 

187,484 
145,454 
87,572 
69,115 
204,100 
35,501 
179,073 

10,630 
850 

1,080 
920,859 

— 
— 
— 
62,267 
214,583 
49,955 
— 

9,474 
— 

1,081 
337,360 

— 
— 
— 
261,256 
490,088 
67,749 
— 

16,514 
— 

940 
836,547 

— 
— 
— 
558,670 
1,422,449 
48,724 
— 

7,441 
— 

175 
2,037,459 

*       Excludes current portion of long-term liabilities and long-term liabilities which were classified to short-term.
**
Includes current portion of long-term liabilities and long-term liabilities which were classified to short-term.
*** Financial Guarantees contractual period in Qoros is dependent on Qoros’s timeliness to meet the obligation of current loans payable. $179 million is the maximum projected cash flow in relation

to the financial guarantees provided to Chery with respect to the obligation of Qoros.

D.   

 Market risks

Market risk is the risk that changes in market prices, such as foreign exchange rates, the CPI, interest rates and prices of capital products and instruments will affect the fair value of the future cash
flows of a financial instrument.

The Group buys and sells derivatives in the ordinary course of business, and also incurs financial liabilities, in order to manage market risks. All such transactions are carried out within the guidelines
set by the Boards of Directors of the companies. For the most part, the Group companies enter into hedging transactions for purposes of avoiding economic exposures that arise from their operating
activities. Most of the transactions entered into do not meet the conditions for recognition as an accounting hedge and, therefore, differences in their fair values are recorded on the statement of profit
and loss.

(1)  

 CPI and foreign currency risk

Currency risk

The Group’s functional currency is the U.S. dollar. The exposures of the Group companies are measured with reference to the changes in the exchange rate of the dollar vis-à-vis the other currencies in
which it transacts business.

The Group is exposed to currency risk on sales, purchases, assets and liabilities that are denominated in a currency other than the respective functional currencies of the Group entities. The primary
exposure is to the shekel, euro, pound, Peruvian Nuevo Sol and yuan (RMB).

The Group uses options and forward exchange contracts on exchange rates for purposes of hedging short-term currency risks, usually up to one year, in order to reduce the risk with respect to the final
cash flows in dollars deriving from the existing assets and liabilities and sales and purchases of goods and services within the framework of firm or anticipated commitments, including in relation to
future operating expenses.

The Group is exposed to currency risk in relation to loans it has taken out and debentures it has issued in currencies other than the dollar. The principal amounts of these bank loans and debentures
have been hedged by swap transactions the repayment date of which corresponds with the payment date of the loans and debentures.

F - 120

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

Inflation risk

The Group has CPI-linked loans. The Group is exposed to high payments of interest and principal as the result of an increase in the CPI. It is noted that part of the Group’s anticipated revenues will be
linked to the CPI. The Group does not hedge this exposure beyond the expected hedge included in its revenues.

(a)

Exposure to CPI and foreign currency risks The Group’s exposure to CPI and foreign currency risk, based on nominal amounts, is as follows:

Non-derivative instruments
Cash and cash equivalents
Short-term investments, deposits and loans
Trade receivables
Other receivables
Long-term deposits and loans
Total financial assets

Loans from banks and others
Trade payables
Other payables
Long-term loans from banks and others and debentures
Total financial liabilities

Total non-derivative financial instruments, net
Derivative instruments
Net exposure

Non-derivative instruments
Cash and cash equivalents
Short-term investments, deposits and loans
Trade receivables
Other receivables
Long-term deposits and loans
Total financial assets

Loans from banks and others
Trade payables
Other payables
Long-term loans from banks and others and debentures
Loans and capital notes from the parent company
Total financial liabilities

Total non-derivative financial instruments, net
Derivative instruments
Net exposure

As at December 31, 2016
Foreign currency

Shekel

Unlinked

CPI linked

Other

11,810 
29,137 
34,779 
665 
20,349 
96,740 

— 
26,913 
1,093 
444 
28,450 

68,290 
— 
68,290 

— 
— 
— 
— 
— 
— 

— 
— 
1,205 
416,266 
417,471 

(417,471)  

— 

(417,471)  

24,240 
26,198 
172,664 
6,964 
16,412 
246,478 

34,998 
128,512 
17,266 
465,262 
646,038 

(399,560)
(2,421)
(401,981)

As at December 31, 2015
Foreign currency

Shekel

Unlinked

CPI linked

Other

103,844 
73,112 
31,306 
12,789 
19,565 
240,616 

— 

(31,045)  
(2,484)  
(5,494)  
— 

(39,023)  

201,593 
— 
201,593 

— 
— 
— 
— 
— 
— 

— 
— 
(2,469)  
(473,151)  

— 

(475,620)  

(475,620)  

— 

(475,620)  

39,892 
5,305 
40,456 
4,537 
17,865 
108,055 

(7,083)
(20,856)
(11,384)
(59,356)
— 
(98,679)

9,376 
— 
9,376 

F - 121

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

(b)   Sensitivity analysis

A strengthening of the dollar exchange rate by 5%–10% against the following currencies and change of the CPI in rate of 5%–10% would have increased (decreased) the net income or net loss and
the equity by the amounts shown below. This analysis assumes that all other variables, in particular interest rates, remain constant. The analysis is performed on the same basis for 2014.

Non-derivative instruments
Shekel/dollar
CPI
Dollar/other

Non-derivative instruments
Shekel/dollar
CPI
Dollar/other

     (2)

Interest rate risk

10% increase

5% increase

5% decrease

10% decrease

As at December 31, 2016

$ thousands

6,208 
(37,952)  
(44,447)  

3,252 
(19,880)  
(21,044)  

(3,252)  
19,880 
19,037 

(6,208)
37,952 
36,332 

10% increase

5% increase

5% decrease

10% decrease

As at December 31, 2015

$ thousands

40,718 
(56,247)  
1,017 

21,596 
(28,123)  
482 

(24,415)  
28,123 

(436)  

(52,081)
56,247 
(833)

The Group is exposed to changes in the interest rates with respect to loans bearing interest at variable rates, as well as in relation to swap transactions of liabilities in foreign currency for dollar
liabilities bearing a variable interest rate.

The Group has not set a policy limiting the exposure and it hedges this exposure based on forecasts of future interest rates.

The Group enters into transactions mainly to reduce the exposure to cash flow risk in respect of interest rates. The transactions include interest rate swaps and “collars”. In addition, options are
acquired and written for hedging the interest rate at different rates.

Type of interest

Set forth below is detail of the type of interest borne by the Group’s interest-bearing financial instruments:

Fixed rate instruments
Financial assets
Financial liabilities

Variable rate instruments
Financial assets
Financial liabilities

F - 122

As at December 31

2016

2015

Carrying amount
$ thousands

157,121 
(1,530,715)
(1,373,594)

20,167 
2,600,799 
(2,580,632)

401,671 
(1,431,787)
(1,030,116)

29,363 
(1,132,904)
(1,103,541)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
 
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

Type of interest (Cont’d)

The Group’s assets and liabilities bearing fixed interest are not measured at fair value through the statement of profit and loss and the Group does not designate derivatives interest rate swaps as
hedging instruments under a fair value hedge accounting model. Therefore, a change in the interest rates as at the date of the report would not be expected to affect the income or loss with respect
to changes in the value of fixed – interest assets and liabilities.

A  change  of  100  basis  points  in  interest  rate  at  reporting  date  would  have  increased/(decreased)  profit  and  loss  before  tax  by  the  amounts  below.  This  analysis  assumes  that  all  variables,  in
particular foreign currency rates, remain constant.

Variable rate instruments

Variable rate instruments

E. Fair value

(1)

Fair value compared with carrying value

As at December 31, 2016

100bp increase  

  100 bp decrease  

$ thousands

(25,806)  

25,806 

As at December 31, 2015

100bp increase  

  100 bp decrease  

$ thousands

(11,035)  

11,035 

The Group’s financial instruments include mainly non-derivative assets, such as: cash and cash equivalents, investments, deposits and short-term loans, receivables and debit balances, investments
and long-term receivables; non-derivative liabilities: such as: short-term credit, payables and credit balances, long-term loans, finance leases and other liabilities; as well as derivative financial
instruments.

Due to their nature, the fair value of the financial instruments included in the Group’s working capital is generally identical or approximates the book value.

The following table shows in detail the carrying amount and the fair value of financial instrument groups presented in the financial statements not in accordance with their fair value.

Non-convertible debentures
Long-term loans from banks and others (excluding interests)

Non-convertible debentures
Long-term loans from banks and others (excluding interests)

As at December 31, 2016

  Carrying amount  

Level 2

$ thousands

867,287 
2,116,740 

947,786 
2,354,612 

As at December 31, 2015

  Carrying amount  

Level 2

$ thousands

671,247 
2,003,443 

764,878 
2,197,177 

* The fair value is measured using the technique of discounting the future cash flows with respect to the principal component and the discounted interest using the market interest rate on the

measurement date.

F - 123

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

(2) Hierarchy of fair value

The following table presents an analysis of the financial instruments measured at fair value, using an evaluation method. The various levels were defined as follows:

– Level 1: Quoted prices (not adjusted) in an active market for identical instruments.
– Level 2: Observed data, direct or indirect, not included in Level 1 above.
– Level 3: Data not based on observed market data.

Assets
Marketable securities held for trade
Tower-series 9 options
Derivatives not used for accounting hedge (a)

Liabilities
Financial guarantee
Derivatives used for accounting hedge
Derivatives not used for accounting hedge
Other financial derivatives

As at
December 31, 2016  
Level 2
$ thousands

Level 1

As at
December 31, 2015
Level 2
$ thousands

Level 3

— 
— 
3,173 
3,173 

— 
25,264 
2,125 
29,594 
56,983 

6,412 
12,175 
— 
18,587 

— 
— 
— 
— 
— 

— 
— 
2,864 
2,864 

— 
44,909 
3,276 
— 
48,185 

— 
— 
— 
— 

34,263 
— 
— 
— 
34,263 

(a) Includes $3 million AIE’s embedded derivative not used for hedging. This embedded derivative corresponds to the fair value of AIE’s gas agreement which lets AIE to resell its not-used gas on
the corresponding market to a third party.

(3) Data and measurement of the fair value of financial instruments at Level 2

Level 2

The fair value of forward contracts on foreign currency is determined using trading programs that are based on market prices. The market price is determined based on a weighting of the exchange
rate and the appropriate interest coefficient for the period of the transaction along with an index of the relevant currencies.

The fair value of contracts for exchange (SWAP) of interest rates and fuel prices is determined using trading programs which incorporate market prices, the remaining term of the contract and the
credit risks of the parties to the contract.

The fair value of currency and interest exchange (SWAP) transactions is valued using discounted future cash flows at the market interest rate for the remaining term.

The fair value of transactions used to hedge inflation is valued using discounted future cash flows which incorporate the forward CPI curve, and market interest rates for the remaining term.

If the inputs used to measure the fair value of an asset or liability might be categorized in different levels of the fair value hierarchy, then the fair value measurement is categorized in its entirety in
the same level of the fair value hierarchy as the lowest level input that is significant to the entire measurement.

The fair value of marketable securities held for trade is determined using the ‘Discounts for Lack of Marketability’ (“DLOM”) valuation method, which is a method used to calculate the value of
restricted securities. The method purports that the only difference between a company’s common stock and its restricted securities is the lack of marketability of the restricted securities which is
derived from the price difference between both prices.

F - 124

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 31 – Financial Instruments (Cont’d)

The following table shows the valuation techniques used in measuring Level 2 fair values as at December 31, 2016 and 2015, as well as the significant unobservable inputs used.

Type

 Interest rate Swaps

 Foreign
Exchange
 Forwards

Credit from banks, others and
debentures

Marketable Securities held for
trade

Valuation
technique
The Group applies standard valuation techniques
such as: discounted cash flows for fixed and
variables coupons (estimated with forward
curves) using as discounted rates the
projected LIBOR zero coupon curve . The
observable inputs are obtained through market
information suppliers.

The Group applies standard valuation techniques
which include market observable parameters such
as the implicit exchange rate calculated with
forward points. These variables are obtained
through market information suppliers.

Significant
unobservable
data

Inter-relationship between
significant unobservable inputs
and fair value measurement

Not applicable

Not applicable

Not applicable

Not applicable

Discounted cash flows with market interest rate

Not applicable

DLOM valuation method

Not applicable

Not applicable

Not applicable

(4) Data and measurement of the fair value of financial instruments at Level 3

Level 3

The fair value of financial guarantee was based on the Merton model using the method known as Monte Carlo Simulation “MCS”. MCS approximates the probability of certain outcomes by
running multiple simulations, using various inputs. The MCS performed over the financial guarantee was based on the inputs and the assumption that Qoros has a certain amount of risk-free debt
that will be repaid at a later date. The significant unobservable inputs used in the valuation are Qoros’ assets value, debt exercise price and the volatility of its assets. The estimated fair value
would increase if the asset value decreased, debt exercise price increased and volatility of its assets in the market.

F - 125

 
 
 
 
 
 
 
 
 
 
 
 
Note 32 – Subsequent Events

A.

 Kenon

(a) Funding to Qoros

On March 10, 2017, Kenon announces that it has agreed to fund the provision of up to RMB777 million (approximately $114 million) to Qoros in relation to the full release of its remaining
RMB850 million (approximately $125 million) back-to-back guarantee obligations to Chery in two tranches, which releases Kenon from commitments to pay any related interest and fees to
Chery under the guarantees (See Note 10.C.b.8).

(b) Qoros introduces a new strategic partner

In April 2017, Quantum and Chery entered into an agreement with Yibin Municipal Government ("Yibin"), Sichuan province, People's Republic of China. This provides Yibin a platform to join
as  a  strategic  partner  to  invest  in  Qoros  in  connection  with  the  establishment  of  a  New  Energy  Vehicle  manufacturing  base.  Further  agreements  are  necessary  to  establish  the  investment
framework for new facilities  and the implementation  of the strategic cooperation and investment. Such further agreements,  once executed, are expected to involve significant investments by
Yibin in Qoros, which would dilute Quantum's and Chery's interests in Qoros.

B.

I.C. Power

(a) Samay I

Further to that stated in Note 13.B(4), on January 17 and 31, 2017, Unit 2 and 3 of Samay I power plant restarted commercial operations and became available for system dispatch.

(b) I.C. Power Ltd.

On January 20, 2017, the authority of Singapore approved (i) the change of name of I.C. Power Singapore from “I.C. Power Pte. Ltd.” to “I.C. Power Ltd.”;. and, (ii) the conversion of I.C. Power
Singapore from “Private Company Limited by shares” to “Public Company Limited by shares”.

In addition, on January 20, 2017, I.C. Power Singapore conducted a share split whereby each of its ordinary shares was subdivided into 143.03338 ordinary shares following such share split. After
the share spilt the number of issued ordinary shares is 80 million.

On February 20, 2017, I.C. Power Singapore, withdrew its US initial public offering, citing market conditions. It had filed to raise $350 million by offering 25.9 million shares at a price range of
$12 to $15.

(c) Agreement with non-controlling interest

On March 2, 2017, Samay III S.A. and Yesid Gasca Durán (NCI of Supertroil and Surenergy in Colombia) signed an agreement to split the assets of Supertroil and Surenergy. A period of 90 days
is  established  from  the  date  of  signature  for  closing  the  precedent  conditions.  As  a  result  of  this  agreement,  Inkia  has  updated  its  impairment  analysis  expecting  that  the  book  value  of  the
subsidiaries’ assets will exceed their recoverable amount. Therefore, during the first quarter of 2017 the company is expecting to record an impairment in the amount of approximately $14 million.

(d) Greenday acquisition

On  December  29,  2016,  I.C.  Power  Asia  Development  Ltd  executed  an  agreement  to  acquire  85%  of  Greenday  Renewable  Energy  Ltd  subject  to  $550  thousand  payment  and  Anti-Trust
Authority's approval, which occurred on January 12, 2017.  Greenday has a potential pipeline of over 240 MW of solar fields, andout of which six projects of approximately 50 MW, which are
expected to participate in 2017 tenders.

(e)

ICPI acquisition

On April 6, 2017, ICPI has entered into an agreement to acquire 95% of the shares of Zomet Energy Ltd. (“Zomet”) from Ipswich Holdings Netherlands B.V. (47.5%) and Rapac Energy Ltd.
(47.5%).  Zomet holds the rights to develop a natural gas fired power station at Plugot Junction, Israel with an estimated capacity of approximately 396 MW, in addition to land rights and statutory
approvals. Completion of the transaction is subject to the fulfillment of certain conditions, including various regulatory approvals.

The project has been approved as a national infrastructure project by the government and the National Infrastructure Committee of Israel. The natural gas power plant will produce electricity using
open cycle technology, and is expected to serve as a peaking unit. The project is expected to be funded through a combination of equity and project finance debt. The Group is currently unable to
make an estimate of the financial effect of this event.

F - 126

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 32 – Subsequent Events (Con’t)

(f) Update on Kanan

On April 11, 2017, Kanan’s 92 MW power plant in Panama, consisting of a 55 MW barge and, a 37 MW barge which experienced fire with significant damage, and both barges have been placed
off-line. There were no injuries resulting from the fire.

I.C. Power intends to seek coverage for the costs of such outage, including repair costs and loss of profit, as appropriate, from insurance coverage (subject to deductibles). I.C. Power's management
is still assessing the impact of the damage and the resulting outage, I.C. Power does not expect the fire and outage to have a material adverse effect on I.C. Power's results of operations. I.C. Power
is assessing various options to resume the Kanan power plant's operations and a reasonable estimate of the damage will be made after the impact assessment. The Group is currently unable to make
an estimate of the financial effect of this event.

F - 127

 
 
 
 
 
 
Qoros Automotive Co., Ltd.

Consolidated financial statements
31 December 2016

F - 128

 
The Board of Directors:
Qoros Automotive Co., Ltd.:

I ndependent Auditors’ Report

We  have  audited  the  accompanying  consolidated  financial  statements  of  Qoros  Automotive  Co.,  Ltd.  and  its  subsidiaries,  which  comprise  the  consolidated  statements  of  financial  position  as  of  31
December 2016 and 2015, and the related consolidated statements of profit or loss and other comprehensive income, changes in equity, and cash flows for each of the years in the three-year period ended
31 December 2016, and the related notes to the consolidated financial statements.

Management’s Responsibility for the Consolidated Financial Statements

Management  is  responsible  for  the  preparation  and  fair  presentation  of  these  consolidated  financial  statements  in  accordance  with  International  Financial  Reporting  Standards  as  issued  by  the
International  Accounting  Standard  Board;  this  includes  the  design,  implementation,  and  maintenance  of  internal  control  relevant  to  the  preparation  and  fair  presentation  of  consolidated  financial
statements that are free from material misstatement, whether due to fraud or error.

Auditors’ Responsibility

Our responsibility is to express an opinion on these consolidated financial  statements  based on our audits. We  conducted our audits in accordance  with auditing standards generally  accepted in the
United  States  of  America.  Those  standards  require  that  we  plan  and  perform  the  audit  to  obtain  reasonable  assurance  about  whether  the  consolidated  financial  statements  are  free  from  material
misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the consolidated financial statements. The procedures selected depend on the auditors' judgment,
including the assessment of the risks of material misstatement of the consolidated financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal
control  relevant  to  the  entity's  preparation  and  fair  presentation  of  the  consolidated  financial  statements  in  order  to  design  audit  procedures  that  are  appropriate  in  the  circumstances,  but  not  for  the
purpose  of  expressing  an  opinion  on  the  effectiveness  of  the  entity's  internal  control.  Accordingly,  we  express  no  such  opinion.  An  audit  also  includes  evaluating  the  appropriateness  of  accounting
policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

F - 129

 
 
 
 
 
 
 
 
 
 
 
 
Opinion

In our opinion, the consolidated financial statements referred to above present fairly in all material respects, the financial position of Qoros Automotive Co., Ltd. and its subsidiaries as of 31 December
2016 and 2015, and the results of their operations and their cash flows for each of the years in the three-year  period ended 31 December  2016, in accordance with International  Financial Reporting
Standards as issued by the International Accounting Standards Board.

/s/ KPMG Huazhen LLP

Shanghai, China
27 March 2017

F - 130

 
 
 
 
Consolidated statements of financial position
31 December

In thousands of RMB

Assets
Property, plant and equipment
Intangible assets
Prepayments for purchase of equipment
Lease prepayments
Trade and other receivables
Pledged deposits
Equity-accounted investee

Non-current assets

Inventories
VAT recoverable
Trade and other receivables
Prepayments
Available-for-sale financial assets
Pledged deposits
Cash and cash equivalents

Current assets

Total assets

The accompanying notes are an integral part of these consolidated financial statements.

F - 131

Note

2016 

2015 

14
15

16
17
18

19

17

20
18
21

4,219,023 
4,322,900 
1,061 
199,303 
91,743 
8,403 
1,987 

4 , 275,167 
4,656,474 
59,276 
203,716 
92,202 
- 
2,032 

8,844,420 

9,288,867 

322,201 
807,484 
60,091 
13,049 
100,000 
36,237 
464,759 

244,854 
832,503 
42,645 
36,431 
- 
113,167 
257,270 

1,803,821 

1,526 , 870 

10,648,241 

10,815,737 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
Consolidated statements of financial position (continued)
31 December

In thousands of RMB

Equity
Paid-in capital
Reserves
Accumulated losses

Total equity

Liabilities
Loans and borrowings
Deferred income
Trade and other payables
Provisions

Non-current liabilities

Loans and borrowings
Trade and other payables
Deferred income

Current liabilities

Total liabilities

Total equity and liabilities

Approved and authorised for issue by the Board of Directors on 27 March 2017.

The accompanying notes are an integral part of these consolidated financial statements.

F - 132

Note

22

23
24
25
26

23
25
24

2016 

2015 

10,425,480 
53,386 

(10,032,879)  

8,331,840 
(44)
(8,135,997)

445,987 

195,799 

4,248,660 
412,083 
112,488 
55,516 

4,659,718 
169,396 
- 
20,964 

4,828,747 

4,850,078 

2,641,486 
2,684,669 
47,352 

2,829,470 
2,615,541 
324,849 

5,373,507 

5,769,860 

10,202,254 

10,619,938 

10,648,241 

10,815,737 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
Consolidated statements of profit or loss and other comprehensive income
For the year ended 31 December

In thousands of RMB

Revenue
Cost of sales

Gross loss

Other income
Research and development expenses
Selling, general  and administrative expenses
Other expenses

Operating loss

Finance income
Finance costs

Net finance costs

Share of (loss) / profit of equity- accounted investee, net of nil tax

Loss before tax
Income tax expense

Loss for the year

Other comprehensive income

Items that are or may be reclassified to profit or loss
Foreign operations - foreign currency translation differences

Other comprehensive income,  net of nil tax

Total comprehensive income for the year

The accompanying notes are an integral part of these consolidated financial statements.

F - 133

Note

7

8
9
10
11

12(a)
12(a)

12(a)

13

2016 

2015 

2014 

2,511,925 
(3,008,831)  

1,459,339 
(1,713,043)  

864,957 
(1,019,264)

(496,906)  

(253,704)  

(154,307)

77,128 
(204,242)  
(762,966)  
(106,577)  

36,690 
(278,008)  
(1,559,995)  
(74,174)  

37,349 
(264,019)
(1,518,822)
(62,716)

(1,493,563)  

(2,129,191)  

( 1,962,515)

16,573 
(419,592)  

13,429 
(359,126)  

25,822 
(217,337)

(403,019)  

(345,697)  

(191,515)

(45)  

7 

(123)

(1,896,627)  
(255)  

(2,474,881)  
(575)  

(2,154,153)
(533)

(1,896,882)  

(2,475,456)  

( 2,154,686)

48 

48 

( 18)  

(18)  

( 154)

(154)

(1,896,834)  

(2,475,474)  

(2,154,840)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
Consolidated statements of changes in equity
For the year ended 31 December

In thousands of RMB

Note

Balance at 1 January 2014

Loss for the year
Other comprehensive income

Total comprehensive income

Capital injection from investors

Total contributions

Balance at 31 December 2014

Balance at 1 January 2015

Loss for the year
Other comprehensive income

Total comprehensive income

Conversion of shareholders' loans to capital (Note 22)

Total contributions

Balance at 31 December 2015

The accompanying notes are an integral part of these consolidated financial statements.

Paid-in 
capital 

5,931,840 

- 
- 

- 

600,000 

600,000 

6,531,840 

6,531,840 

- 
- 

- 

1,800,000 

1,800,000 

8,331,840 

F - 134

Capital 
reserve 

124 

- 
- 

- 

23 

23 

147 

147 

- 
- 

- 

- 

- 

Translation 
reserve 

Accumulated 
losses 

Total 

(19)

- 
(154)

(154)

- 

- 

(173)

(173)

- 
(18)

(18)

- 

- 

(3,505,855)

2,426,090 

(2,154,686)
- 

(2,154,686)
(154)

(2,154,686)

(2,154,840)

- 

- 

600,023 

600,023 

(5,660,541)

871,273 

(5,660,541)

871,273 

(2,475,456)
- 

(2,475,456)
(18)

(2,475,456)

(2,475,474)

- 

- 

1,800,000 

1,800,000 

147 

(191)

(8,135,997)

195,799 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
Consolidated statements of changes in equity (continued)
For the year ended 31 December

In thousands of RMB

Note

Balance at 1 January 2016

Loss for the year
Other comprehensive income

Total comprehensive income

Conversion of shareholders' loans to capital (Note 22)

Total contributions

Balance at 31 December 2016

The accompanying notes are an integral part of these consolidated financial statements.

Paid-in 
capital 

8,331,840 

- 
- 

- 

2,093,640 

2,093,640 

10,425,480 

F - 135

Capital 
reserve 

147 

- 
- 

- 

53,382 

53,382 

53,529 

Translation 
reserve 

Accumulated 
losses 

Total 

(191)

(8,135,997)

195,799 

- 
48 

48 

- 

- 

(1,896,882)
- 

(1,896,882)
48 

(1,896,882)

(1,896,834)

- 

- 

2,147,022 

2,147,022 

(143)

(10,032,879)

445,987 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
Consolidated statements of cash flows
For the year ended 31 December

In thousands of RMB

Note

2016 

2015 

2014 

Cash flows from operating activities
Loss for the year
Adjustments for:
Depreciation
Amortisation of
- intangible assets
- lease prepayments
Impairment losses on other receivables
Net finance costs
Tax expense
Share of profit of equity- accounted, investee, net of tax
Loss on disposal of property, plant, and equipment
Deferred income

Changes in:
- inventories
- trade and other receivables
- VAT recoverable
- prepayments
- trade and other payables
- pledge deposit
- deferred income

Cash used in operating activities

Income taxes paid

Net cash used in operating activities

The accompanying notes are an integral part of these consolidated financial statements.

F - 136

(1,896,882)

(2,475,456)

(2,154,686)

361,764 

422,492 
4,413 
10,859 
403,019 
255 
45 
2,679 
(44,496)

227,477 

236,223 
4,412 
9,493 
345,697 
575 
(7)
4,813 
(11,079)

143,586 

52,315 
4,413 
- 
200,600 
533 
- 
172 
(10,638)

(735,852)

(1,657,852)

(1,763,705)

(77,347)
(30,404)
25,019 
23,382 
431,754 
25,576 
9,686 

(47,332)
(322,106)
170,112 
118,224 
560,630 
- 
300,000 

(30,306)
(235,444)
- 
(51,116)
505,094 
- 
- 

(328,186)

(878,324)

(1,575,477)

(255)

(575)

(533)

(328,441)

(878,899)

(1,576,010)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
  
  
  
  
  
  
  
 
 
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
Consolidated statements of cash flows (continued)
For the year ended 31 December

In thousands of RMB

Note

2016 

2015 

2014 

Cash flows from investing activities
Interest received
Acquisition of available-for- sale financial assets
Proceeds from disposal of available-for-sale financial assets
Collection of pledged deposits
Placement of pledged deposits
Acquisition of property, plant and equipment and intangible assets
Acquisition of equity in associate

Net cash used in investing activities

The accompanying notes are an integral part of these consolidated financial statements.

F - 137

19,131 
(126,000)
26,000 
10,519 
(10,519)
(595,625)
- 

15,019 
(175,000)
175,000 
508,093 
(330,420)
(1,334,856)
- 

15,771 
- 
32,000 
60,393 
(190,840)
(1,943,903)
(2,025)

(676,494)

(1,142,164)

(2,028,604)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
  
  
  
  
 
 
 
  
  
  
  
  
  
  
 
 
  
  
  
  
 
Consolidated statements of cash flows (continued)
for the year ended 31 December

In thousands of RMB

Cash flows from financing activities
Proceeds from borrowings
Repayment of borrowings
Interest paid
Collection of guarantee deposit
Placement of guarantee deposit

Net cash from financing activities

Net increase/ (decrease) in cash and cash equivalents

Cash and cash equivalents at 1 January

Effect of foreign exchange rate changes

Cash and cash equivalents at 31 December

Tcompanying notes are an integral part of the consolidated financial statements.

F - 138

Note

2016 

2015 

2014 

2,949,985 
(1,470,344)
(310,863)
55,451 
(12,500)

5,564,733 
(3,644,550)
(393,837)
100,219 
(100,219)

5,442,286 
(1,649,847)
(325,157)
31,520 
- 

1,211,729 

1,526,346 

3,498,802 

206,794 

257,270 

695 

(494,717)

(105,812)

752,088 

857,900 

(101)

- 

464,759 

257,270 

752,088 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
 
  
  
  
  
 
  
  
  
  
 
  
  
  
  
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
  
  
  
  
 
 
  
  
  
  
  
  
  
 
  
  
  
  
 
 
Notes to the consolidated financial statements

1

Reporting entity

Qoros Automotive Co., Ltd. ("the Company") is a sino-foreign joint equity enterprise established on 24 December 2007 in the People's Republic of China ("PRC") by Wuhu Chery Automobile
Investment Co., Ltd ("Wuhu Chery") and Quantum (2007) LLC ("Quantum").  The Company's registered office is Changshu, Jiangsu Province, PRC. The Company has three wholly-owned
subsidiaries, Qoros Automotive Europe GmbH incorporated in Germany, Qoros Car Sales Co., Ltd. incorporated in Changshu and Changshu Guanyizhizhong Auto Sales & Service Co., Ltd.
incorporated in Changshu ("the Subsidiaries").  These consolidated financial statements comprise the Company and the Subsidiaries (together referred to as the "Group").

The Group's principal activities are research and development, manufacture and sale of automobiles and spare parts.

2

(a)

Basis of preparation

Basis of accounting

The consolidated financial statements have been prepared in accordance with International Financial Reporting Standards ("IFRSs") , which collective terms includes International Accounting
Standards and related interpretations, promulgated by the International Accounting Standards Board ("IASB") .  They were authorised for issue by the Group's board of directors on 27 March
2017.

(b)

Going concern basis of accounting

The Group incurred a net loss of RMB 1.90 billion for the year ended 31 December 2016.  The Group had net current liabilities of approximately RMB 3.57 billion as of 31 December 2016,
including short-term bank loans of RMB 1.2 billion and shareholder loans of RMB 1.4 billion.

The Group management has given careful consideration to the future liquidity of the Group and its available sources of finance in assessing whether the Group will have sufficient financial
resources to continue as a going concern.

(i)

Renewal of Short-term Credit Facilities

In 2017, the Group has renewed most of its existing short-term credit facilities in the amount of RMB 2,846 million beyond 31 December 2017. Up to the reporting date, all the short-
term loans that were due subsequent to 31 December 2016 have been renewed.

F - 139

 
 
 
 
 
 
 
 
 
 
 
 
 
 
2

(b)

Basis of preparation (continued)

Going concern basis of accounting (continued)

(ii)

Shareholders' loans

Both shareholders have committed that all shareholder loans outstanding as at 31 December 2016 will be converted to capital upon the approval of the relevant Chinese authority or
rolled  over  beyond  31  December  2017.  The  Shareholders  further  lent  an  additional  loan  of  RMB  388.5  million  to  the  Group  in  March  2017  and  are  committed  to  provide  another
RMB388.5 million when needed.

(iii)

Improvement in Working Capital Management

The Group believes that it has the ability to negotiate with a number of vendors, for them to provide the Group with lower prices or more favorable payment terms. In addition, the Group
has implemented measures to more closely monitor the inventory levels with an aim to improve working capital management and cut down non-core business activities and expenditures,
if necessary.

Based on the Group's updated five-year business plan, cash flow forecast, unutilised bank loan facilities, the ability to refinance existing short term loans and extension of payment terms with
major  vendors,  management  believes  the  Group  will  generate  sufficient  cash  flows  to  meet  its  liabilities  as  and  when  they  fall  due  in  the  next  twelve  months  from  31  December  2016.    In
preparing the cash flow forecast, management takes into consideration the unused bank loan facilities of RMB 205 million as at 31 December 2016 (Note 23), the renewal of short-term credit
facilities, the extension of payment to its suppliers, and are of the opinion that the assumptions which are included in the cash flow forecast are reasonable.  In the event that market conditions
and demand for the Group's products are not as the Group's expected, and despite its best efforts, the Group is unable to extend the payment term with its suppliers, the Group plans to reduce its
capital expenditures to meet its commitments and liabilities.  Accordingly, the consolidated financial statements have been prepared on a going concern basis.   If for any reason the Group is
unable to continue as a going concern, then this could have a material impact on the Group's ability to realise assets at their recognised values and to extinguish liabilities in the normal course of
business at the amounts stated in the consolidated financial statements.

(c)

Basis of measurement

The consolidated financial statements have been prepared on the historical cost basis except that the financial instruments classified as available-for-sale are measured at their fair value (see
Note 4 (l)(ii)) .

(d)

Functional and presentation currency

These consolidated financial statements are presented in Renminbi ("RMB", the "presentation currency"), which is also the Company's functional currency.  All amounts have been rounded to
the nearest thousand unless otherwise stated.

F - 140

 
 
 
 
 
 
 
 
 
 
 
 
 
3

Change in accounting policy

The IASB has issued a number of amendments to IFRSs that are first effective for the current accounting period of the Group. None of these developments have had a material effect on how the
Group's results and financial position for the current or prior periods have been prepared or presented.

The Group has not applied any new standard or interpretation that is not yet effective for the current accounting period.

4

Significant accounting policies

The accounting polices set out below have been applied consistently to all periods presented in these financial statements.

(a)

(i)

Basis of consolidation

Subsidiaries

Subsidiaries are entities controlled by the Group.  The Group controls an entity when it is exposed to, or has rights to, variable returns from its involvement with the entity and has the ability to
affect those returns through its power over the entity.

(ii)

Interests in equity-accounted investee

The Group has significant influence over, but does not control or jointly control, the financial and operating policies of Fund & Liberty car rental & leasing Co., Ltd. ("Fund"), an entity which
the Group held a 25% and 25% equity interest in as of December 31, 2015 and 2016.

The  Group  accounts  for  its  investment  in  Fund  using  the  equity  method.  Under  the  equity  method,  interests  in  equity-accounted  investees  are  initially  recognised  at  cost,  which  includes
transaction costs.  Subsequent to initial recognition, the consolidated financial statements include the share of the profit or loss and other comprehensive income ("OCI") of equity-accounted
investees, until the date on which significant influence ceases.

(iii)

Transaction eliminated on consolidation

Intra-group balances and transactions, and any unrealised income and expenses arising from intra-group transactions, are eliminated.  Unrealised gains arising from transactions with equity-
accounted investees are eliminated against the investment to the extent of the interest in the investee.  Unrealised losses are eliminated in the same way as unrealised gains, but only to the extent
that there is no evidence of impairment.

F - 141

 
 
 
 
 
 
 
 
 
 
 
 
 
4

(b)

(i)

Significant accounting policies (continued)

Revenue

Sale of goods

Revenue from the sale of goods in the course of ordinary activities is measured at the fair value of the consideration received or receivable, net of value-added tax ("VAT"), consumption tax and
other  sales  taxes,  returns  or  allowances,  trade  discounts  and  rebates.    Revenue  is  recognised  when  persuasive  evidence  exists,  usually  in  the  form  of  an  executed  sales  agreement,  that  the
significant risks and rewards of ownership have been transferred to the customers, recovery of the consideration is probable, the associated costs and possible return of goods can be estimated
reliably, there is no continuing management involvement with the goods, and the amount of revenue can be measured reliably.

 (ii)

Rental income

Rental income from operating leases is recognised as revenue on a straight-line basis over the term of the lease.  Any lease incentives granted are recognised as an integral part of the total rental
income, over the term of the lease.

(iii)

Licencing income

Licence fee and royalties received for the use of the Group's assets (such as platform technology and patent) are normally recognised in accordance with the substance of the agreement.

(c)

Government grants

Government grants are initially recognised as deferred income at fair value if there is reasonable assurance that they will be received and the Group will comply with the conditions associated
with the grant; they are then recognised in profit or loss as other income on a systematic basis over the useful life of the asset.

Grants that compensate the Group for expenses incurred are recognised in profit or loss on a systematic basis in the periods in which the expenses are recognised.

(d)

Finance income and finance costs

Finance income comprises interest income on funds invested (including available-for-sale financial assets) and net foreign currency exchange gain (Note (e)(i)) .

Finance costs comprise interest expense on borrowings and net foreign currency exchange losses (Note (e)(i)).

Interest  income  is  recognised  using  the  effective  interest  method.  Borrowing  costs  that  are  not  directly  attributable  to  the  acquisition,  construction  or  production  of  a  qualifying  asset  are
recognised in profit or loss using the effective interest method.

F - 142

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(e)

(i)

Significant accounting policies (continued)

Foreign currency

Foreign currency transactions

Transactions in foreign currencies are translated to the respective functional currencies of the Group companies at exchange rates at the dates of the transactions.

Monetary assets and liabilities denominated in foreign currencies are translated to the functional currency at the exchange rate at the reporting date.  Foreign currency differences are generally
recognised in profit or loss.  Non-monetary items that are measured based on historical cost in a foreign currency are not translated.

(ii)

Foreign operations

The functional currency of Qoros Automotive Europe GmbH is Euros.  The assets and liabilities of Qoros Automotive Europe GmbH, are translated into RMB at exchange rates at the reporting
date.  The income and expenses of foreign operations are translated into RMB at the exchange rates at the dates of the transactions.

Foreign currency differences are recognised in other comprehensive income and accumulated in the translation reserve.

(f)

(i)

Employee benefits

Short-term employee benefits

Short-term employee benefit obligations are measured on an undiscounted basis and are expensed as the related service is provided.  A liability is recognised for the amount expected to be paid
if the Group has a present legal or constructive obligations to pay this amount as a result of past service provided by the employee, and the obligation can be estimated reliably.

(ii)

Contributions to defined contribution retirement plans in the PRC

Contributions to local retirement schemes pursuant to the relevant labour rules and regulations in the PRC are recognised as an expense in profit or loss as incurred.

(iii)

Termination benefits

Termination benefits are expensed at the earlier of when the Group can no longer withdraw the offer of those benefits and when the Group recognises costs for a restructuring.  If benefits are
not expected to be settled wholly within 12 months of the reporting date, then they are discounted.

F - 143

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

Significant accounting policies (continued)

  (g)

Income tax

Income tax expense comprises current and any deferred tax.  Income tax expense is recognised in profit or loss except to the extent that it relates to a business combination, or items recognised
directly in equity or in other comprehensive income.

(i)

Current tax

Current tax comprises the expected tax payable or receivable on the taxable income or loss for the year and any adjustment to tax payable or receivable in respect of previous years.  Current tax
is measured using tax rates enacted or substantively enacted at the reporting date.  Current tax also includes any tax arising from dividends.

Current tax assets and liabilities are offset only if certain criteria are met.

(ii)

Deferred tax

Deferred tax is recognised in respect of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for taxation purposes.
Deferred tax is not recognised for:

--

--

temporary differences on the initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit or loss;

temporary differences related to investments in subsidiaries and equity method investees to the extent that the Group is able to control the timing of the reversal of the temporary
differences and it is probable that they will not reverse in the foreseeable future; and

Deferred tax assets are recognised for unused tax losses, unused tax credits and deductible temporary differences to the extent that it is probable that future taxable profits will be available
against which they can be used.  Deferred tax assets are reviewed at each reporting date and are reduced to the extent that it is no longer probable that the related tax benefit will be realised,
such reductions are reversed when the probability of future taxable profits improves.

Unrecognised deferred tax assets are reassessed at each reporting date and recognised to the extent that it has become probable that future taxable profits will be available against which they can
be used.

Deferred tax is measured at the tax rates that are expected to be applied to temporary differences when they reverse, using tax rates enacted or substantively enacted at the reporting date.

The measurement of deferred tax reflects the tax consequences that would follow from the manner in which the Group expects, at the reporting date, to recover or settle the carrying amount of
its assets and liabilities.

Deferred tax assets and liabilities are offset only if certain criteria are met.

F - 144

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

Significant accounting policies (continued)

 (h)

Inventories

Inventories are measured at the lower of cost and net realisable value.  The cost of inventories is based on the weighted-average principle, and includes expenditure incurred in acquiring the
inventories, production or conversion costs and other costs incurred to bring them to their existing location and condition.  In the case of manufactured inventories and work in progress, cost
includes direct labour and an appropriate share of production overheads based on normal operating capacity .

Net realisable value is the estimated selling price in the ordinary course of business, less the estimated costs of completion and selling expenses.

(i)

(i)

Property, plant and equipment

Recognition and measurement

Items of property, plant and equipment are measured at cost less accumulated depreciation and accumulated impairment losses.

Cost includes expenditure that is directly attributable to the acquisition of the asset.  The cost of self-constructed assets includes the followings:

--

--

--

--

the cost of materials and direct labour;

any other costs directly attributable to bringing the assets to a working condition for their intended;

when the Group has an obligation to remove the asset or restore the site, an estimate of the costs of dismantling and removing the items and restoring the site on which they are located;
and

capitalised borrowing costs.

If significant parts of an item of property, plant and equipment have different useful lives, they are accounted for as separate items (major components) of property, plant and equipment.

Any gain or loss on disposal of an item of property, plant and equipment (calculated as the difference between the net proceeds from disposal and the carrying amount of the item) is recognised
in profit or loss.

(ii)

Subsequent costs

Subsequent expenditure is capitalised only when it is probable that the future economic benefits associated with the expenditure will flow to the Group.  Ongoing repairs and maintenance is
expensed as incurred.

F - 145

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(i)

Significant accounting policies (continued)

Property, plant and equipment (continued)

(iii)

Depreciation

Items of property, plant and equipment are depreciated from the date that they are installed and are ready for use, or in respect of internally constructed assets, from the date that the asset is
completed and ready for use.

Except for toolings, depreciation is calculated to write off the cost of items of property, plant and equipment less their estimated residual values using the straight-line basis over their estimated
useful lives and is generally recognised in profit or loss.  Leased assets are depreciated over the shorter of the lease term and their useful lives unless it is reasonably certain that the Group will
obtain ownership by the end of the lease term. No depreciation is provided on construction in progress.

The estimated useful lives of property, plant and equipment are as follows:

--

--

--

Buildings                                                   30 years

Equipment                                           3 - 20 years

Leasehold improvements                          3 years

Toolings are depreciated on a systematic basis based on the quantity of related products produced.

Depreciation methods, useful lives and residual values are reviewed at each reporting date and adjusted if appropriate.

(j)

(i)

Intangible assets

Research and development

Expenditure on research activities, undertaken with the prospect of gaining new scientific or technical knowledge and understanding, is recognised in profit or loss as incurred.

Development activities involve a plan or design for the production of new or substantially improved products and processes.  Development expenditure is capitalised only if development costs
can  be  measured  reliably,  the  product  or  process  is  technically  and  commercially  feasible,  future  economic  benefits  are  probable,  and  the  Group  intends  to  and  has  sufficient  resources  to
complete development and to use or sell the asset.  The expenditure capitalised includes the cost of materials, direct labour, overhead costs that are directly attributable to preparing the asset for
its  intended  use,  and  capitalised  borrowing  costs.    Other  development  expenditure  is  recognised  in  profit  or  loss  as  incurred  subsequent  to  initial  recognition.  Capitalised  development
expenditure is measured at cost less accumulated amortisation and accumulated impairment losses.

F - 146

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(j)

Significant accounting policies (continued)

Intangible assets (continued)

(ii)

Other intangible assets

Other intangible assets that are acquired by the Group and have finite useful lives are measured at cost less accumulated amortisation and any accumulated impairment losses.

(iii)

Subsequent expenditure

Subsequent expenditure is capitalised only when it increases the future economic benefits embodied in the specific asset to which it relates.  All other expenditure, including expenditure on
internally generated goodwill and brands, is recognised in profit or loss as incurred.

(iv)

Amortisation

Amortisation is calculated to write off the cost of intangible assets less their estimated residual values from the date they are available for use using the straight-line method over their estimated
useful lives or other systematic basis, and is generally recognised in profit or loss.

Except for capitalised development costs, the estimated useful lives of intangible assets are as follows:

-

-

        Software                                        10 years

Capitalised development costs are amortised on a systematic basis based on the quantity of related products produced.

Amortisation methods, useful lives and residual values are reviewed at each reporting date and adjusted if appropriate.

(k)

Lease prepayments

All land in PRC is state-owned and no private land ownership exists.  The Group acquired the right to use certain land and the amounts paid for such right are recorded as lease prepayment. 
Lease prepayment is carried at historical cost less accumulated amortisation and any impairment losses.  Amortisation is calculated on a straight-line basis over the respective periods of the
rights.

F - 147

 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(l)

Significant accounting policies (continued)

Financial instruments

The Group classifies non-derivative financial assets into the following categories: loans and receivables and available-for-sale financial assets.

The Group classifies non-derivative financial liabilities into the following categories: financial liabilities at fair value through profit or loss and other financial liabilities category.

(i)

Non-derivative financial assets and financial liabilities - recognition and derecognition

The Group initially recognises loans and receivables and debt securities issued on the date when they are originated.  All other financial assets and financial liabilities are initially recognised on
the trade date when the entity becomes a party to the contractual provision of the instrument.

The Group derecognises a financial asset when the contractual rights to the cash flows from the asset expire, or it transfers the rights to receive the contractual cash flows in a transaction in
which substantially all the risks and rewards of ownership of the financial asset are transferred, or it neither transfers nor retains substantially all of the risks and rewards of ownership and does
not retain control over the transferred assets.  Any interest in such derecognised financial assets that is created or retained by the Group is recognised as a separate asset or liability.

The Group derecognises a financial liability when its contractual obligations are discharged or cancelled, or expire.

Financial assets and liabilities are offset and the net amount presented in the statement of financial position when, and only when, the Group has a legally enforceable right to offset the amounts
and intends either to settle them on a net basis or to realise the asset and settle the liability simultaneously.

(ii)

Non-derivative financial assets - measurement

Loans and receivables

Loans and receivables are initially measured at fair value plus any directly attributable transaction costs. Subsequent to initial recognition, they are measured at amortised cost using the effective
interest method.

Available-for- sale financial assets

Available-for-sale financial assets are initially measured at fair value plus any directly attributable transaction costs.

Subsequent to initial recognition, they are measured at fair value and changes therein, other than impairment losses are recognised in other comprehensive income and accumulated in the fair
value reserve.  When these assets are derecognised, the gain or loss accumulated in equity is reclassified to profit or loss.

F - 148

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(l)

Significant accounting policies (continued)

Financial instruments (continued)

(iii)

Non-derivative financial liabilities - measurement

A financial liability is classified as at fair value through profit or loss if it is classified as held-to-trading or is designated as such on initial recognition.  Directly attributable transaction costs are
recognised in profit or loss as incurred.  Financial liabilities at fair value through profit or loss are measured at fair value and changes therein, including any interest expenses, are recognised in
profit or loss.

Other non-derivative financial liabilities are initially measured at fair value less any directly attributable transaction costs.  Subsequent to initial recognition, these liabilities are measured at
amortised cost using effective interest method.

(m)

Impairment

(i)

Non-derivative financial assets

Financial  assets  not  classified  as  at  fair  value  through  profit  or  loss,  including  an  interest  in  an  equity-accounted  investee,  are  assessed  at  each  reporting  date  to  determine  whether  there  is
objective evidence of impairment.

Objective evidence that financial assets are impaired includes:

--

--

--

--

--

--

default or delinquency by a debtor;

restructuring of an amount due to the Group on terms that the Group would not consider otherwise;

indications that a debtor or issuer will enter bankruptcy;

adverse changes in the payment status of borrowers or issuers;

the disappearance of an active market for a security;

observable date indicating that there is measureable decrease in expected cash flows from a group of financial assets.

For an investment in an equity security, objective evidence of impairment includes a significant or prolonged decline in its fair value below its cost.  The Group considers a decline of 20% to be
significant and a period of nine months to be prolonged.

Financial assets measured at amortised costs

The Group considers evidence of impairment for these assets at both an individual asset and a collective level.  All individually significant assets are individually assessed for impairment. 
Those  found  not  to  be  impaired  are  then  collectively  assessed  for  any  impairment  that  has  been  incurred  but  not  yet  individually  identified.    Assets  that  are  not  individually  significant  are
collectively assessed for impairment.  Collective assessment is carried out by grouping together assets with similar risk characteristics.

F - 149

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

Significant accounting policies (continued)

(m)

Impairment (continued)

(i)

Non-derivative financial assets (continued)

In assessing collective impairment, the Group uses historical information on the timing of recoveries and the amount of loss incurred, and make an adjustment if current economic and credit
conditions are such that the actual losses are likely to be greater or less than suggested by historical trends.

An impairment loss is calculated as the difference between its carrying amount and the present value of the estimated future cash flows discounted at the asset's original effective interest rate. 
Losses are recognised in profit or loss and reflected in an allowance account.   When the Group considers that there are no realistic prospects of recovery of the asset, the relevant amounts are
written off.  If the amount of impairment loss subsequently decreases and the decrease can be related objectively to an event occurring after the impairment was recognized, then the previously
recognized impairment loss is reversed through profit or loss.

Available-for- sale financial assets

Impairment losses on available-for-sale financial assets are recognised by reclassifying the loss accumulated in the fair value reserve to profit or loss.  The amount reclassified is the difference
between the acquisition cost (net of any principal repayment and amortisation), and the current fair value, less any impairment losses recognised previously in profit or loss.  If the fair value of
an  impaired  available-for-sale  debt  security  subsequently  increases  and  the  increase  can  be  related  objectively  to  an  event  occurring  after  the  impairment  loss  was  recognised,  then  the
impairment  loss  is  reversed  through profit  or  loss.   Impairment  losses  recognised in  profit  or  loss  for  an  investment in  an  equity  instrument  classified  as  available-for-sale are  not  reversed
through profit or loss.

(ii)

Non-financial assets

The carrying amounts of the Group's non-financial assets (other than inventories) are reviewed at each reporting date to determine whether there is any indication of impairment.  If any such
indication exists, then the asset's recoverable  amount is estimated.  In addition, intangible assets that are not yet available for use are tested annually for impairment. An impairment loss is
recognised if the carrying amount of an asset or its related cash-generating unit (CGU) exceeds its estimated recoverable amount.

For impairment testing, assets are grouped together into the smallest group of assets that generates cash inflows from continuing use that are largely independent of the cash inflows of other
assets or CGUs.

The recoverable amount of an asset or CGU is the greater of its value in use and its fair value less costs to sell.  Value in use is based on the estimated future cash flows, discounted to their
present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset or CGU.

F - 150

 
 
 
 
 
 
 
 
 
 
 
4

Significant accounting policies (continued)

(m)

Impairment (continued)

(ii)

Non-financial assets (continued)

Impairment losses are recognised in profit or loss. They are allocated first to reduce the carrying amount of any goodwill allocated to the CGU, and then to reduce the carrying amounts of the
other assets in the CGU on a pro rata basis.

An impairment loss is reversed only to the extent that the asset's carrying amount does not exceed the carrying amount that would have been determined, net of depreciation or amortisation, if
no impairment loss had been recognised.

(n)

Warranty costs

A provision for warranties is recognised when the underlying products or services are sold, based on estimate by the Group's technicians and by reference to industrial data.

(o)

Provision and contingent liabilities

Provisions  are  recognised  for  other  liabilities  of  uncertain  timing  or  amount  when  the  Group  or  the  Company  has  a  legal  or  constructive  obligation  arising  as  a  result  of  a  past  event,  it  is
probable that an outflow of economic benefits will be required to settle the obligation and a reliable estimate can be made.  Where the time value of money is material, provisions are stated at
the present value of the expenditure expected to settle the obligation.

Where  it  is  not  probable  that  an  outflow  of  economic  benefits  will  be  required,  or  the  amount  cannot  be  estimated  reliably,  the  obligation  is  disclosed  as  a  contingent  liability,  unless  the
probability of outflow of economic benefits is remote.  Possible obligations, whose existence will only be confirmed by the occurrence or non-occurrence of one or more future events are also
disclosed as contingent liabilities unless the probability of outflow of economic benefits is remote.

(p)

Leases

The Company's leases are classified as operating leases and are not recognised in the Group's statement of financial position.

Payments made under operating leases are recognised in profit or loss on a straight-line basis over the term of the lease.  Lease incentives received are recognised as an integral part of the total
lease expenses, over the term of the lease.

F - 151

 
 
 
 
 
 
 
 
 
 
 
 
 
4

(q)

Significant accounting policies (continued)

Related parties

(a)

A person, or a close member of that person's family, is related to the Group if that person:

(i)

has control or joint control over the Group;

(ii)

has significant influence over the Group; or

(iii)

is a member of the key management personnel of the Group or the Group's parent or ultimate controlling shareholders.

(b)

An entity is related to the Group if any of the following conditions applies:

(i)

The entity and the Group are members of the same Group;

(ii)

One entity is an associate or joint venture of the other entity (or an associate of joint venture of a member of a Group of which the other entity is a member);

(iii) Both entities are joint ventures of the same third party;

(iv) One entity is a joint venture of a third entity and the other entity is an associate of the third entity;

(v)

The entity is a post-employment benefit plan for the benefit of employees of the Group or an entity related to the Group;

(vi)

The entity is controlled or jointly controlled by a person identified in (a);

(vii) A person identified in (a)(i) has significant influence over the entity or is a member of the key management personnel of the entity (or of a parent of the entity);

(viii) The entity, or any member of a group of which it is a part, provides key management personnel services to the group or to the group's parent.

Close members of the family of a person are those family members who may be expected to influence, or be influenced by, that person in their dealings with the entity.

F - 152

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(r)

Significant accounting policies (continued)

Standards and interpretation issued but not yet adopted

Up to date of issue of the Financial Statements, the IASB has issued a number of amendments and new standards which are not yet effective for the year ended 31 December 2016 and which
have not been adopted in the Financial Statements.  These include the following which may be relevant to the Group.

Amendments to IAS 7, Disclosure initiative

Amendments to IAS 12, Income taxes - Recognition of deferred tax assets for unrealised losses

Amendments to IFRS 2, Classification and measurement of share-based payment transactions

Amendments to IFRS 4, Applying IFRS 9 Financial instruments with IFRS 4 Insurance contracts

IFRIC 22, Foreign currency transactions and advance consideration

IFRS 15, Revenue from contracts with customers

IFRS 9, Financial instruments (2014)

IFRS 16, Leases

Effective for
accounting periods
beginning on or after

1 January 2017

1 January 2017

1 January 2018

1 January 2018

1 January 2018

1 January 2018

1 January 2018

1 January 2019

The Group is in the process of making an assessment of what the impact of these amendments is expected to be in the period of initial application.  So far it has concluded that the adoption of
them is unlikely to have a significant impact on the Group's results of operations and financial position, except for the following.

IFRS 15 Revenue from contracts with customers

IFRS  15  establishes  a  comprehensive  framework  for  determining  whether,  how  much  and  when  revenue  is  recognised.    It  replaces  existing  revenue  recognition  guidance,  including  IAS18
Revenue, IAS11 Construction contracts and IFRIC 13 Customer Loyalty Programmes.  It also includes guidance on when to capitalise costs of obtaining or fulfilling a contract not otherwise
addressed in other standards, and includes expanded disclosure requirements.

F - 153

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4

(r)

Significant accounting policies (continued)

Standards and interpretation issued but not yet adopted (continued)

IFRS 16 Leases

IFRS 16 provides comprehensive guidance for the identification of lease arrangements and their treatment by lessees and lessors.  In particular, IFRS16 introduces a single lessee accounting
model,  whereby  assets  and  liabilities  are  recognised  for  all  leases,  subject  to  limited  exceptions.    It  replaces  IAS  17  Leases  and  the  related  interpretations  including  IFRIC  4  Determining
whether an arrangement contains a lease.

The Group does not plan to early adopt the above new standards or amendments.  With respect to IFRSs 15 and 16, given the Group has not completed its assessment of their full impact on the
Group, their possible impact on the Group's results of operations and financial position has not been quantified.

5

Use of estimates and judgements

In preparing these consolidated financial statements, the management has made judgements, estimates and assumptions that affect the application of the Group's accounting policies and the
reported amounts of assets, liabilities, income and expenses.  Actual results may differ from these estimates.

Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to estimates are recognised prospectively.

(a)

(i)

(b)

(i)

Judgements

Research and development costs

Determining capitalisation of development costs involves management judgements in assessing whether a product is technically and commercially feasible, and whether the Group has sufficient
resources to complete development and to use or sell the asset.

Assumptions and estimation uncertainties

Depreciation and amortisation

Property, plant and equipment, intangible assets and lease prepayments are depreciated/amortised on a straight-line basis over the estimated useful lives or other systematic basis, after taking
into account the estimated residual value.  The Group reviews annually the useful life of an asset and its residual value, if any.  The useful lives are based on the management's knowledge and
historical  experience  with  similar  assets  and  taking  into  account  anticipated  technology  changes.    The  depreciation  and  amortisation  expenses  for  future  periods  are  adjusted  if  there  are
significant changes from previous estimates.

F - 154

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5

Use of estimates and judgements (continued)

(ii)

Net realisable value of inventories

The management reviews the carrying amounts of the inventories at each reporting period end date to determine whether the inventories are carried at the lower of cost and net realisable value. 
Management estimates the net realisable value based on the current market situation and their historical experience on similar inventories.  Any change in the assumptions would increase or
decrease the amount of inventories write-down or the related reversals of write-downs and affect the Group's net asset value.

(iii)

Impairment for non-current assets

If circumstances indicate that the carrying value of property, plant and equipment, lease prepayments, intangible assets may not be recoverable, their recoverable amounts are estimated.  An
impairment loss is recognised when the recoverable amount has declined below the carrying amounts in accordance with IAS 36, " Impairment of assets ".  In addition, for intangible assets that
are not yet available for use, the recoverable amount is estimated annually whether or not there is an indication of impairment.

Determining the recoverable amount requires an estimation of the fair value less costs of disposal or the value in use of these assets or the CGU to which these assets belong.  It is difficult to
precisely estimate fair value of these assets because quoted market prices for most of these assets are not readily available.  In determining the value in use, expected cash flows generated by the
asset  are  discounted  to  their  present  value,  which  requires  significant  judgment  relating  to  level  of  sales  volume,  sales  revenue  and  amount  of  operating  costs.    The  Group  uses  all  readily
available information in determining an amount that is a reasonable approximation of recoverable amount, including estimates based on reasonable and supportable assumptions and projections
of sales volume, sales revenue and amount of operating costs.

F - 155

 
 
 
 
 
 
 
6

Segment reporting

IFRS 8, Operating Segments, requires identification and disclosure of operating segment based on internal financial reports that are regularly reviewed by the Group's chief operating decision
maker for the purpose of resources allocation and performance assessment.  On this basis, the Group has determined that it have only one operating segment and the amount of each significant
category of revenue is disclosed in Note 7.

No revenue derived from sales to a single customer individually accounted for over 10% of the Group's total revenue for the year.

Substantially all (99%) of the Groups plant and equipment, intangible assets and lease prepayments are located in Mainland China.

7

Revenue

In thousands of RMB

Sales of goods
Rendering of service
-Rental income
-Others

Total

8

Other income

In thousands of RMB

Government grants
Licencing income (Note 24)
Others

Total

2016 

2015 

2014 

2,495,479 

1,435,136 

822,630 

9,150 
7,296 

12,009 
12,194 

41,747 
580 

2,511,925 

1,459,339 

864,957 

2016 

35,796 
30,000 
11,332 

77,128 

2015 

33,024 
- 
3,666 

36,690 

2014 

37,162 
- 
187 

37,349 

F - 156

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9

Research and development expenses

Research and development expenses are the expenses incurred for the research and development activities of car platform and models as follows:

In thousands of RMB

CF1X
CF11 and CF11K
CF14 and CF14K
CF16 and CF16BM
Diesel
TGDI
Qloud
BJ6
BEV
BF16
Others

Total

10

Selling, general and administrative expenses

In thousands of RMB

Advertising, marketing and promotion
Personnel expenses
Depreciation and amortisation
Office expenses
Consulting fees
Warranty
Logistics
Rental expenses
Others

Total

2016 

42,700 
28,741 
30,390 
51,983 
- 
23,794 
5,289 
6,588 
9,978 
2,697 
2,082 

204,242 

2016 

170,288 
166,730 
130,029 
94,636 
61,575 
54,236 
33,530 
29,796 
22,146 

2015 

169,432 
16,355 
43,296 
5,415 
- 
11,777 
31,733 
- 
- 
- 
- 

278,008 

2015 

562,476 
322,293 
205,144 
125,469 
141,728 
25,687 
25,856 
30,903 
120,439 

2014 

8,964 
123,721 
30,490 
74,776 
20,419 
5,649 
- 
- 
- 
- 
- 

264,019 

2014 

574,458 
312,901 
74,221 
123,869 
277,148 
12,978 
12,386 
46,403 
84,458 

762,966 

1,559,995 

1,518,822 

F - 157

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
11

Other expenses

In thousands of RMB

Impairment loss on debts
Price adjustment on purchase of material and parts (Note 30(c))
Other taxes and surcharges
Others

Total

12

Loss before income tax

Loss for the year is arrived at after charging:

(a)           Net finance costs:

In thousands of RMB

Interest income from available-for-sale financial assets
Interest income from bank deposits
Net foreign exchange gain

Finance income

Interest expense
Less: interest expenses capitalised into property, plant and equipment, and development costs

Net foreign exchange loss

Finance costs

Net finance costs

F - 158

2016 

10,859 
72,953 
13,106 
9,659 

106,577 

2016 

2 
16,571 
- 

16,573 

2015 

9,493 
42,877 
8,066 
13,738 

74,174 

2015 

39 
13,390 
- 

13,429 

2014 

- 
- 
46,386 
16,330 

62,716 

2014 

720 
16,583 
8,519 

25,822 

(440,476)
24,603 

(386,376)
92,975 

(301,908)
84,571 

(3,719)

(65,725)

- 

(419,592)

(359,126)

(217,337)

(403,019)

(345,697)

(191,515)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
12

Loss before income tax (continued)

(b)           Personnel expenses:

In thousands of RMB

Contributions to defined contribution retirement plan
Salaries, wages and other benefits

(c)           Other items:

Amortisation

- lease prepayment
- intangible assets

Depreciation
- property, plant and equipment

Operating lease charges
- hire of office rentals
- hire of cars

2016 

2015 

2014 

(30,954)  
(253,148)  

(34,928)  
(448,836)  

(36,710)
(490,120)

(284,102)  

(483,764)  

(526,830)

(4,413)  
(422,492)  

(4,412)  
(236,223)  

(4,413)
(52,315)

(426,905)  

(240,635)  

(56,728)

(361,764)  

(227,477)  

(143,586)

(24,026)  
(2,516)  

(28,579)  
(3,515)  

(53,340)
(4,714)

(26,542)  

(32,094)  

(58,054)

F - 159

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
13

Income taxes

(a)           Amounts recognised in profit or loss

In thousands of RMB

Current tax expense - Germany Income Tax

Current year

2016 

2015 

2014 

255 

575 

533 

Under the Corporate Income Tax Law of the PRC (the "CIT Law"), the statutory corporate income tax rate of the Company and its subsidiaries, Qoros Automotive Sales Co., Ltd. and Changshu
Guanyizhizhong Auto Sales & Service Co., Ltd., is 25% (2015: 25%).

The statutory corporate income tax rate of Qoros Automotive Europe GmbH, the Group's subsidiary incorporated in Germany, is 15%.

Under the CIT Law and its relevant regulations, qualified R&D expenses are subject to income tax deductions at 150% on the amount actually incurred.

(b)           Reconciliation of effective tax rate

In thousands of RMB

Loss before tax
Income tax credit at the applicable PRC income tax rate of 25%
Effect of tax rate differential
Effect of tax losses not recognised
Effect of other temporary differences not recognised
Recognition of previously unrecognised deductible temporary differences
Non-deductible expenses

Income tax expense

F - 160

2016 

2015 

2014 

(1,896,627)  
(474,157)  

99 
539,836 
- 

(65,590)  

67 

255 

(2,474,881)  
(618,720)  

155 
521,005 
98,021 
- 
114 

575 

(2,154,153)
(538,538)
91 
448,814 
89,857 
- 
309 

533 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
13

(c)

Income taxes (continued)

Unrecognised deferred tax assets

Deferred  tax  assets  have not been  recognised  in respect  of the following  items  because  it is  not probable  that  future  taxable  profit  will  be available  against  which the Group can  utilise  the
benefits therefrom:

In thousands of RMB

Tax losses
Other temporary differences

Total

Under current tax legislation, the above deductible tax losses will expire in the following years:

In thousands of RMB

2019

2020
2021

F - 161

31 December       

2016 

2015 

2014 

7,506,001 
2,250,829 

5,457,817 
2,513,187 

3,373,796 
2,121,104 

9,756,830 

7,971,004 

5,494,900 

31 December 2016

2,476,346 

2,474,084 
2,555,571 

7,506,001 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
14

Property, plant and equipment

In thousands of RMB

Cost
Balance at 1 January 2015

Additions
Transfer
Adjustment
Disposal

Balance at 31 December 2015

Additions
Transfer
Disposal
Effect of movement in exchange rates

Leasehold
improvements 

Equipment 

Building 

Construction in
progress 

Total 

22,990 

18,421 
- 
- 
- 

41,411 

45,77 
- 
(332)  
6 

2,501,840 

1,283,280 

439,995 

4,248,105 

2,765 
13,901 
(47,788)  
(5,202)  

- 
(843)  
(36,294)  

- 

530,405 
(13,058)  

- 
- 

551,591 
- 
(84,082)
(5,202)

2,465,516 

1,246,143 

957,342 

4,710,412 

3,851 
1,189,159 

(4,401)  
103 

895 
43,443 
- 
- 

335,965 
(1,269,669)  

- 
- 

345,288 
(37,067)
(4,733)
109 

Balance at 31 December 2016

45,662 

3,654,228 

1,290,481 

23,638 

5,014,009 

Depreciation
Balance at 1 January 2015

Depreciation for the year
Written off on disposal

(20,007)  

(143,052)  

(45,098)  

(6,435)  

- 

(180,009)  

389 

(41,033)  

- 

Balance at 31 December 2015

(26,442)  

(322,672)  

(86,131)  

- 

- 
- 

- 

- 
- 
- 

- 

(208,157)

(227,477)
389 

(435,245)

(361,764)
2,054 
(31)

(794,986)

(6,339)  
332 

(1)  

(304,455)  
1,722 

(30)  

(50,970)  

- 
- 

(32,450)  

(625,435)  

(137,101)  

2,983 

2,358,788 

1,238,182 

439,995 

4,039,948 

14,969 

2,142,844 

1,160,012 

957,342 

4,275,167 

13,212 

3,028,793 

1,153,380 

23,638 

4,219,023 

F - 162

Depreciation for the year
Written off on disposal
Effect of movement in exchange rates

Balance at 31 December 2016

Carrying amount
Balance at 31 December 2014

Balance at 31 December 2015

Balance at 31 December 2016

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
14

Property, plant and equipment (continued)

Leased plant and machinery

The Group leases pressing machinery as a lessor under operating leases. As at 31 December 2016, the net carrying amount of leased machinery was RMB 64,698 thousand (31 December 2015:
RMB 73,391 thousand).

Property, plant and equipment under construction

Included in additions of construction in progress is an amount of RMB 24,603 thousand representing borrowing costs capitalised during 2016, (2015: RMB 59,900 thousand; 2014: RMB 24,432
thousand), using a capitalisation rate of 5.04% per annum (2015: 5.72%; 2014: 7.56%).

As at 31 December 2016, all equipment and properties were pledged to bank as security as required by a consortium financing agreement. (Note 23(a)(i))

Impairment test

Management  performed  an impairment  test  of the Group's operating  assets  (primarily  the property, plant  and equipment,  intangible  assets  and lease  prepayments)  as of 31 December  2016,
based upon the Group's updated business plan for the next five years, due to accumulated operating losses.

The Group's operating assets are allocated to the Group's only cash generating unit ("CGU"). The recoverable amount of the CGU is determined based on fair value less costs of disposal using
discounted cash flow projections. These calculations use cash flow projections based on business plan approved by management covering a five-year period ending 31 December 2021 and the
terminal value.  Cash flows beyond the five-year period are extrapolated using an estimated weighted average growth rate of 3% which is consistent with the forecasts included in independent
expert report.  The growth rates used do not exceed the long-term average growth rates for the business in which the CGU operates.

As the result of the impairment test showed the recoverable amount of the CGU higher than its book value as at 31 December 2016, no impairment loss is recognised.

F - 163

 
 
 
 
 
 
 
 
 
 
 
15

Intangible assets

In thousands of RMB

Cost
Balance at 1 January 2015
Additions

Balance at 31 December 2015
Additions
Transfer
Adjustment
Effect of movement in exchange rates

Balance at 31 December 2016

Amortisation
Balance at 1 January 2015
Amortisation for the year

Balance at 31 December 2015
Amortisation for the year
Effect of movement in exchange rates

Balance at 31 December 2016

Carrying amount
Balance at 31 December 2014

Balance at 31 December 2015

Balance at 31 December 2016

Software 

  Development costs 

Total 

433,193 
1,659 

434,852 
493 
37,067 
- 
47 

4,269,957 
252,674 

4,522,631 
221,926 
- 

(170,607)  

- 

4,703,150 
254,333 

4,957,483 
222,419 
37,067 
(170,607)
47 

472,459 

4,573,950 

5,046,409 

(40,497)  
(43,960)  

(84,457)  
(48,820)  
(8)  

(24,289)  
(192,263)  

(216,552)  
(373,672)  

- 

(64,786)
(236,223)

(301,009)
(422,492)
(8)

(133,285)  

(590,224)  

(723,509)

392,696 

4,245,668 

4,638,364 

350,395 

4,306,079 

4,656,474 

339,174 

3,983,726 

4,322,900 

The amortisation of software and capitalised development cost is included in the selling, general and administrative expenses and cost of sales, respectively, in the consolidated statement of
profit or loss and other comprehensive income.

See Note 25 for payables for research and development activities as at reporting date.

There is no borrowing costs capitalised during 2016 (2015: RMB 33,075 thousand, 2014: RMB 60,139 thousand).

The Company reversed the original cost of development costs capitalised in prior years of RMB 171 million based on final amount confirmed with the suppliers.

Management performed an impairment test of the Group's operating assets as of 31 December 2016. See Note 14 for the result of impairment test.

F - 164

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
16

Lease prepayments

In thousands of RMB

Cost
Balance at 1 January and 31 December

Amortisation
Balance at 1 January
Amortisation for the year

Balance at 31 December

Carrying amount
Balance at 1 January

Balance at 31 December

2016 

2015 

220,631 

220,631 

(16,915)  
(4,413)  

(12,503)
(4,412)

(21,328)  

(16,915)

203,716 

208,128 

199,303 

203,716 

As at 31 December 2016 and 2015, the Group's lease prepayments represented the lease prepayments of land use rights located in Changshu, Jiangsu Province. Such lease prepayments were
pledged to bank as security for a consortium financing agreement (Note 23(a)(i)).

F - 165

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
17

(a)

Trade and other receivables

Trade and other receivables in the consolidated statement of financial position comprised:

In thousands of RMB

Trade receivables
Bills receivables
Deposits
Deferred expenses
Receivables due from employees
Receivables due from related parties
Others

Less: allowance for doubtful debts

Non-current
Current

(b)

Impairment of trade and other receivables

In thousands of RMB

Balance at 1 January
Impairment loss recognised

Balance at 31 December

F - 166

Note

30(c)

31 December

2016 

20,168 
3,500 
76,805 
26,275 
14,813 
16,284 
14,737 

2015 

5,257 
- 
74,623 
31,052 
15,080 
8,638 
10,086 

172,582 

144,736 

(20,748)  

(9,889)

151,834 

134,847 

91,743 
60,091 

92,202 
42,645 

151,834 

134,847 

31 December
2016 

(9,889)  
(10,859)  

(20,748)  

2015 

(396)
(9,493)

(9,889)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
18

Pledged deposits

Pledged deposits in the consolidated statement of financial position comprised:

In thousands of RMB

Non-current
Current

31 December
2016 

8,403 
36,237 

44,640 

2015 

- 
113,167 

113,167 

Guarantee deposits of RMB 44,640 thousand (31 December 2015: RMB 113,167 thousand) have been pledged with various banks to obtain bank financing or to issue letter of credit facilities
for purchases. The pledge in respect of the bank deposits will be released with the expiration of the relevant bank guarantees and the letter of credit facilities. Of these deposits, RMB 8.4 million
is to be collected beyond one year.

19

(a)

Inventories

Inventory in the consolidated statement of financial position comprised:

In thousands of RMB

Raw materials and consumables
Work in progress
Finished goods

Total

(b)

The analysis of the amount of inventories recognised as an expense and included in profit or loss as follow:

In thousands of RMB

Carrying amount of inventories sold

Total

20

Available-for-sale financial assets

31 December
2016 

81,723 
2,861 
237,617 

322,201 

2015 

60,181 
5,482 
179,191 

244,854 

31 December
2016 

2015 

2,999,396 

1,704,515 

2,999,396 

1,704,515 

Available-for-sale financial assets as of 31 December 2016 represent a principal non-guaranteed short-term financial product from Industrial and Commercial Bank of China. This product has
an expected rate of return of 2.90% per annum. The Company bought the product on 27 December 2016 and collected the principal on 6 January   2017 with an interest income of RMB 69
thousand.

F - 167

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
21

(a)

Cash and cash equivalents

Cash and cash equivalents comprise:

In thousands of RMB

Bank deposits with maturity of 3 months or less
Cash at bank

(b)

 Investing and financing activities not requiring the use of cash or cash equivalents:

In thousands of RMB

Conversion of debt into capital

22

Paid-in capital

In thousands of RMB

Wuhu Chery
Quantum (2007) LLC.

31 December    
2016 

- 
464,759 

464,759 

2015 

1,528 
255,742 

257,270 

2016 

2015 

2,147,022 

1,800,000 

31 December
2016 

5,212,740 
5,212,740 

2015 

4,165,920 
4,165,920 

10,425,480 

8,331,840 

Wuhu Chery and Quantum (2007) LLC. increased paid-in capital of the Company by converting the loans of RMB 1.8 billion in 2015 and RMB 2.1 billion in 2016 due from the Company.

F - 168

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
23

Loans and borrowings

Denominated in:
RMB
USD

Non-current
Current

(a)

Non-current loan and borrowings

In thousands of RMB

Consortium loan I
Consortium loan II
Consortium loan III
PingAn

Total

Note

31 December
2016 

2015 

6,890,146 
- 

6,595,866 
893,322 

6,890,146 

7,489,188 

23(a)
23(b)

4,248,660 
2,641,486 

4,659,718 
2,829,470 

6,890,146 

7,489,188 

Note

(i)
(ii)
(iii)
(iv)

Banking
facility 

3,000,000 
1,200,000 
700,000 
62,500 

Accumulated
drawdown 

Accumulated
repayment 

Reclassified
to current 

Balance as at 31
December 2016 

2,906,000 
1,200,000 
700,000 
62,500 

(148,188)
- 
- 
(4,166)

(387,486)
(30,000)
- 
(50,000)

2,370,326 
1,170,000 
700,000 
8,334 

4,962,500 

4,868,500 

(152,354)

(467,486)

4,248,660 

Details of non-current loans and borrowings are set out below.

(i)

Consortium loan I: On 23 July 2012, the Company entered into a consortium financing arrangement with a Group of banks. Under the arrangement, the Company can draw down loans
in either RMB or USD, up to an aggregate maximum principal amount of RMB 3 billion. The RMB loan bears the 5-year interest rate quoted by the People's Bank of China from time
to time and the USD loan bears interest rate of LIBOR+4.8% per annum. The repayment schedule of loans is based on the instalments schedule as set out in the agreement within 10
years from the first draw down date. The arrangement is secured by the Company's land use right, equipment, properties and construction in progress and is guaranteed by Wuhu Chery
and Changshu Port Development and Construction Co., Ltd ("CPDC") respectively. Each party provides guarantee to an aggregate principal amount of no more than RMB 1.5 billion or
its equivalent. The guarantee from Wuhu Chery and CPDC are several but not joint. In connection with CPDC's guarantee, the Company made a guarantee deposit of RMB 100 million
to CPDC and Wuhu Chery also entered into an agreement to provide a counter-guarantee to CPDC in September 2012. The guarantee deposit was initially recorded in trade and other
receivables at fair value and subsequently measured at amortised cost.  The difference between RMB100 million and fair value on the initial date was deferred and amortised as interest
expenses over the loan period using effective interest rate as the guarantee deposit is directly attributable to the loan.

F - 169

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
 
 
  
  
  
  
  
 
 
  
  
  
  
  
 
 
  
  
  
  
  
 
 
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
 
 
 
 
 
 
 
23

Loans and borrowings (continued)

As at 31 December 2016, the Company has drawn down RMB loans of RMB 2,906 million (31 December 2015: RMB 2,906 million) with an interest rate of 4.90% and repaid RMB
148 million accumulatively.

The loans drawn down from this consortium arrangement contains financial related covenants, that is, debt-to-asset ratio not exceeding 65% and current ratio not below 1.0. In 2013,
the Company obtained a confirmation from the banks that compliance of the financial covenants is not required for 2013 and 2014. In September 2014, the banks further extended the
covenant waiver to July 2017. In 2016, the Company obtained further confirmation from the banks that the compliance of the financial covenants is not required for the next three years
until July 2020.

(ii)

Consortium loan II: On 31 July 2014, the Company entered into an additional consortium financing arrangement with a bank consortium. Under this arrangement, the Company can
draw down loans in either RMB or USD, up to an aggregate maximum principal amount of RMB 1.2 billion.  The RMB loan bears the 5-year interest rate quoted by the People's Bank
of China with 10% mark-up and the USD loan bears interest rate of LIBOR+5% per annum.  The repayment schedule of loans is based on the instalment schedule as set out in the
agreement within 10 years from the first draw down date.

Wuhu  Chery  Automobile  Investment  Co.,  Ltd.  and  Quantum,  shareholders  of  the  Company,  have  each  pledged  17.5%  of  its  then  equity  interest  in  the  Company,  which  is  being
equivalent to a registered capital of RMB 1.1 billion respectively to the bank consortium.

As at 31 December 2016, the Company has drawn down in full an amount of RMB 1.2 billion (31 December 2015: RMB 1.2 billion) with the interest rate of 5.39%.

(iii)

Consortium loan III: On 12 May 2015, the Company entered into a financing arrangement with a bank consortium.  Under the arrangement, the Company can draw down loans in either
RMB or USD, up to an aggregate maximum principal amount of RMB 700 million. The loan agreement covers a period of 102 months starting from 15 May 2015, secured by Chery
Automobile  Co.,  Ltd  ("Chery")  and  pledged  by  the  Company's  90  vehicle  patents  with  an  appraisal  value  totalling  no  less  than  RMB  3.1  billion.    The  RMB  loan  bears  the  5-year
interest rate quoted by the People's Bank of China with 10% mark-up and the USD loan bears interest of LIBOR+3.5% per annum.  Kenon Holdings Ltd. ("Kenon") provided a back-to-
back guarantee to Chery for RMB 350 million, plus up to RMB 60 million of related fees, in connection with the Company's drawdown of RMB 700 million.

As at 31 December 2016, the Company has drawn down in full an amount of RMB 700 million (31 December 2015: RMB 700 million) with the interest rate of 5.39%.

F - 170

 
 
 
 
 
 
 
 
 
 
23

Loans and borrowings (continued)

(iv)

Ping An: On 30 November 2016, the Company entered into a 15-month financing arrangement with Ping An International Financing and Leasing Co., Ltd through a designated  bank
loan arrangement with Bank of Ningbo. The Company drew down the maximum principal amount of RMB 62.5 million with an interest rate of 6.70%. The Company provided guarantee
deposit of RMB 12.5 million with Bank of Ningbo. Under this arrangement, the Company will make a monthly repayment on principal of RMB 4.2 million for the 15-month period
ending 28 February 2017. The current portion of the loan is RMB 50 million as at 31 December 2016.

(b)

Current loan and borrowings

Current loans and borrowings represented unsecured bank loans of RMB 774 million with maturity period within one year with the interest rates from 4.35% to 6.70%; current portion of the
long-term loans (Note 23(a)); and shareholder loans payable to Wuhu Chery and Quantum totalling RMB 1.4 billion.

As at 31 December 2016, the Company has unutilised loan facilities of RMB 205 million (31 December 2015: RMB 284 million).

24

Deferred income

In thousands of RMB

Balance at 1 January
Addition for the year
Income for the year

Balance at 31 December

Non-current
Current

2016 

2015 

494,245 
9,686 
(44,496)  

205,324 
300,000 
(11,079)

459,435 

494,245 

412,083 
47,352 

459,435 

169,396 
324,849 

494,245 

In November 2012, the Group received RMB 213.5 million from the Management Committee of Changshu Economic & Technology Development Zone, as a result of the Group's investment in
the  Development  Zone.    Such  government  grant  was  initially  recognised  as  "deferred  income"  upon  receipt  and  is  amortised  and  recognised  as  "other  income"  over  the  Group's  expected
remaining period of operation.

In 2015, the Group received RMB 300 million from Chery Auto as a payment in connection with the licence agreement for the use of the Group's platform technology and patent, which is
recognised as current liability in "deferred income". In 2016, after the licence agreement became effective, this amount started to amortise over the period of the agreement as "other income".

F - 171

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
25

Trade and other payables

In thousands of RMB

Trade payables
Bills payables
Other payables for

-research and development activities
-property, plant and equipment
-marketing and promotion
-services

Accrued payroll and other employee benefits
Interest payable
Liabilities due to related parties
Receipt in advance
Others

Non-current
Current

26

Provisions

At 31 December
2016 

826,070 
43,000 

246,763 
181,717 
519,642 
267,503 
53,628 
37,379 
402,188 
39,950 
179,317 

2015 

638,241 
138,303 

362,402 
322,817 
470,620 
238,550 
111,651 
10,145 
106,887 
31,009 
184,916 

2,797,157 

2,615,541 

112,488 
2,684,669 

- 
2,615,541 

2,797,157 

2,615,541 

The provision balance as at 31 December 2016 and 2015 mainly represents warranties related to cars sold. As no adequate historical warranty data associated with cars sold is available, the
Group accrues warranty provisions based on the estimation made by the Group's technical department taking into account available warranty data of similar cars in the market.

27

Financial risk management and fair values of financial instruments

Exposure to credit, liquidity, interest rate and currency risks arises in the normal course of the Group's business.

The Group's exposure to these risks and the financial risk management policies and practice used by the Group to manage these risks are described below.

F - 172

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
27

Financial risk management and fair values of financial instruments (continued)

 (a)

Credit risk

Credit  risk  is  the  risk  of  financial  loss  to  the  Group  if  a  customer  or  counterparty  to  a  financial  instrument  fails  to  meet  its  contractual  obligations,  and  arises  principally  from  the  Group's
receivables from counterparties and the Group's deposits with banks (including available-for-sale financial assets).

The Group establishes an allowance for impairment that represents its estimate of incurred losses in respect of trade and other receivables. The main components of this allowance are a specific
loss component that relates to individually significant exposures.

The management has a credit policy in place and the exposures to these credit risks are monitored on an ongoing basis. Individual credit evaluations are performed on all customers requiring
credit over a certain amount. These evaluations focus on the customer's past history of making payments when due and current liability to pay, and take into account information specific to the
customer as well as pertaining to the economic environment in which the customer operates. Trade debtors are mainly due within 30 days to 360 days from the date of billing.

The Group is also subject to potential financial loss in connection with the guarantee provided in 2016 to Chery Huiyin Motor Finance Service Co., Ltd ("Huiyin"), a subsidiary of Chery, for the
financing arrangement between dealers and Huiyin. In case of loan default, the Group may need to compensate Huiyin for an amount up to the actual loss incurred. As at 31 December 2016, the
outstanding loan balance were RMB 483 million and none of them were overdue.  Refer to note 30(c)(i) for this guarantee arrangement with Huiyin.

The  Group limits  its  exposure  to  credit  risk  by  investing  only  in  liquid  investment  products  issued  by financial  institutions.  Management  actively  monitors  credit  ratings  and  given  that  the
Group only has invested in investment products with high credit ratings, management does not expect any counterparty to fail to meet its obligations.

The carrying amounts of cash and cash equivalents, pledged deposits, trade and other receivables and available-for-sale financial assets represent its maximum credit exposure on these assets.

(b)

Liquidity risk

Liquidity risk is the risk that the Group will encounter difficulty in meeting the obligations associated with its financial liabilities that are settled by delivering cash or another financial asset.

The Group's policy is to regularly  monitor its liquidity  requirements  and its  compliance  with lending covenants,  to ensure that  it maintains  sufficient  reserves  of cash and readily  realisable
marketable securities and adequate committed lines of funding from major financial institutions and/or from two shareholders to meet the liquidity requirements in the short and long term.

F - 173

 
 
 
 
 
 
 
 
 
 
 
 
27

(b)

Financial risk management and fair values of financial instruments (continued)

Liquidity risk (continued)

Consortium loan II and III (see Note 23), contains a "cross-default" provision which provides for an event of default if any other debt of Qoros in excess of RMB 50 million becomes payable
prior to maturity, so a default under other debt facilities would result in a default under the facilities referenced above and a default that leads to acceleration under either facility above will
result in an event of default under the other facility.

The  following  are  the  remaining  contractual  maturities  at  the  end  of  the  reporting  period  of  financial  liabilities,  including  estimated  interest  payments  and  excluding  the  impact  of  netting
agreements:

Within 1 year or
on demand 

More than 1 year
but less than 2
years 

Contractual undiscounted cash flow
More than 2 years
but less than 5
years 

  More than 5 years 

Carrying amount
at balance sheet
date 

Total 

As at 31 December 2016
Trade and other payables
Loans and borrowings

2,684,669 
2,881,389 

21,426 
852,455 

103,885 
2,646,014 

- 
1,489,919 

2,809,980 
7,869,777 

2,797,157 
6,890,146 

Total

5,566,058 

873,881 

2,749,899 

1,489,919 

10 , 679,757 

9,687,303 

As at 31 December 2015
Trade and other payables
Loans and borrowings

Total

(c)

Market risk

2,615,541 
3,147,205 

- 
653,642 

- 
2,647,693 

- 
2,341,573 

2,615,541 
8,790,113 

2,615,541 
7,489,188 

5,762,746 

653,642 

2,647,693 

2,341,573 

11,405,654 

10,104,729 

Market risk is the risk that changes in market prices, such as foreign exchange rates and interest rates will affect the Group's income or the value of its holdings of financial instruments.  The
objective of market risk management is to manage and control market risk exposures within acceptable parameters, while optimising the return.

-

Currency risk

The Group is exposed to currency risk on purchases relating to research and development activities, bank borrowings as well as normal productions that are denominated in currencies other than
the functional currencies. The currencies in which these transactions primarily are denominated are RMB, US dollars ("USD") and Euros ("EUR"). The functional currency of the Company is
RMB.

F - 174

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
27

(c)

Financial risk management and fair values of financial instruments (continued)

Market risk (continued)

In respect of monetary assets and liabilities denominated in foreign currencies, the Group's policy is to ensure that its net exposure is kept to an acceptable level by buying or selling foreign
currencies at spot rates when necessary to address short-term imbalances.

Exposure to currency risk

The summary quantitative data about the Group's exposure to currency risk as reported to the management of the Group is as follows:

EUR

Cash and cash equivalent
Prepayments
Trade and other payables

Net statement of financial position exposure

USD

Cash and cash equivalent
Prepayments
Trade and other payables
Loans and borrowings

Net statement of financial position exposure

GBP

Trade and other payables

Net statement of financial position exposure

F - 175

At 31 December

2016 
RMB'000 

1,549 
784 
(18,673)  

2015 
RMB'000 

5,419 
898 
(18,400)

(16,340)  

(12,083)

At 31 December  
2016 
RMB'000 

2015 
RMB'000 

9,987 
284 
(7,922)  

- 

6,484 
3,624 
(331)
(993,321)

2,349 

(983,544)

At 31 December

2016 
RMB'000 

2015 
RMB'000 

(706)  

(706)  

- 

- 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
27

(c)

Financial risk management and fair values of financial instruments (continued)

Market risk (continued)

The following significant exchange rates have been applied during the year:

EUR
USD
GBP

  Average rate    

  Year end spot rate    

2016

2015

2016

2015

7.2010 
6.7153 
9.0627 

7.2754 
6.3063 
9.5798 

7.3068 
6.9370 
8.5094 

7.0952 
6.4936 
9.6159 

A  reasonably  possible  strengthening  (weakening)  of  the  Euro  and  US  dollar  against  RMB  at  31  December  would  have  affected  the  measurement  of  financial  instruments  denominated  in  a
foreign currency and affected equity and profit or loss by the amounts shown below. The analysis assumes that all other variables, in particular interest rates, remain constant and ignores any
impact of forecast sales and purchases.

EUR (10% movement)
USD (10% movement)
GBP (10% movement)

                -   Interest rate risk

Profile

At 31 December

2016

2015

  Strengthening
  RMB'000

  Weakening
  RMB'000

  Strengthening
  RMB'000

  Weakening
  RMB'000

(1,634)  
235 
(71)  

1,634 
(235)  
71 

(1,207)  
(98,355)  

- 

1,207 
98,355 
- 

The Group's interest rate risk arises primarily from bank deposits and bank loans.  The Group's policy is to obtain the most favourable interest rates available in respect of its bank loans.  The
Group has not used any derivatives to mitigate its interest rate risk exposure.

Bank deposits are with fixed interest rates ranging from 0.30% ~ 1.75%, 0.35% ~ 3.00%, 0.35% ~ 3.30% per annum as at 31 December 2016, 2015 and 2014 respectively.

The Group's interest-bearing borrowings and interest rates as at 31 December 2016 and 2015 are set out as follows:

Borrowings

Loan interest rates are disclosed in Note 23.

F - 176

Interest rate

At 31 December

2016 
RMB'000 

2015 
RMB'000 

4.35% - 6.70% 

6,890,146 

7,488,709 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
27

(c)

Financial risk management and fair values of financial instruments (continued)

Market risk (continued)

Sensitivity analysis

A change of 100 basis points in interest rates would have increased or decreased equity by RMB 69,452 thousand (2015: RMB 91,934  thousand; 2014: RMB 92,915 thousand).

(d)

Fair value

The fair value of each financial instrument is categorised in its entirety based on the lowest level of input that is significant to that fair value measurement. The levels are defined as follows:

●   Level1:

(highest level): fair values measured using quoted prices (unadjusted) in active markets for identical  financial instruments;

●   Level2:

fair values measured using quoted prices in active markets for similar financial instruments, or using valuation techniques in which all significant inputs are directly or indirectly
based on observable market data;

●   Level3:

(lowest level): fair values measured using valuation techniques in which any significant input is not based on observable market data.

If the input used to measure the fair value of an assets or a liability fall into different levels of the fair value hierarchy, then the fair value measurement is categorised in its entirety in the same
level of the fair value hierarchy as the lowest level input that is significant to the entire measurement.

At 31 December 2016, the only financial instrument of the Company carried at fair value was available-for-sale financial asset. The instrument is measured at fair value on a recurring basis and
their fair value measurements fall into Level 2 of the fair value hierarchy described above.

During the years ended 31 December 2016, there were no transfers between Level 1 and Level 2, or transfers into or out of Level 3.  The group's policy is to recognise transfers between levels
of fair value hierarchy as at the end of the reporting period in which they occur.

(e)

Capital management

The Board's policy is to maintain a strong capital base so as to maintain investor, creditor and market confidence and to sustain future development of the business. Capital consists of paid in
capital and retained earnings.

There were no changes in the Group's approach to capital management during the year.

F - 177

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
28

(a)

Operating leases

Leases as lessee

As at 31 December, the future minimum lease payments under non-cancellable operating lease rentals were payable as follows:

In thousands of RMB

Within 1 year
After 1 year but within 5 years
After 5 years

(b)

Leases as lessor

The Group leases out its part of machinery.

As at 31 December, the future minimum lease payments under non-cancellable leases were receivable as follows:

In thousands of RMB

Within 1 year
After 1 year but within 5 years

29

Commitments

Capital commitments outstanding not provided for in the financial statements:

In thousands of RMB

Contracted for
Authorised but not contracted for

F - 178

At 31 December
2016 

35,202 
96,197 
49,762 

2015 

30,206 
82,009 
72,481 

181,161 

184,696 

  At 31 December    

2016 

20,016 
- 

20,016 

2015 

9,367 
- 

9,367 

At 31 December
2016 

266,103 
- 

266,103 

2015 

652,587 
- 

652,587 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
30

(a)

Related parties

Parent and ultimate controlling party

As at 31 December 2016, 2015 and 2014, the Company was jointly-controlled by Wuhu Chery and Quantum (2007) LLC. Chery Automobile Co., Ltd. ("Chery Auto") is the ultimate parent
company of Wuhu Chery and Kenon Holdings Ltd. is the immediate parent company of Quantum (2007) LLC.

The following is a summary of principal related parties transactions carried out by the Group with the related parties for the year presented.

(b)

Transactions with key management personnel

In thousands of RMB

Salaries, benefit and contribution to the defined contribution retirement plan

(c)

Other related party transactions

In thousands of RMB

Loan from Wuhu Chery
Loan from Quantum (2007)
Conversion of loan to capital
   - Wuhu Chery
   - Quantum (2007)
Sale of goods
   - Chery Auto
   - Fund & Liberty Car Rental/Leasing Co., Ltd. ("Fund")
   - Chery Auto's subsidiary
Purchase of material and parts
   - Chery Auto
   - Chery Auto's subsidy
Price adjustment on purchase of material and parts - Chery Auto
Service fee
   - Chery Auto
   - Shanghai SICAR Vehicle Technology Development Co., Ltd. ("SICAR")
Rental and other expenses
   - Chery Huiyin Motor Finance Service Co., Ltd. ("Huiyin")
   - Chery Auto's subsidy
   - Fund
   - Chery Holdings Ltd.
   - Kenon Holdings Ltd.
Charge for licence agreement
Sales proceeds received from Huiyin pursuant to tri-party agreements

Note

11

24
(i)

F - 179

2016 

12,979 

2016 

975,000 
975,000 

1,046,820 
1,046,820 

11,170 
- 
4,533 

327,694 
2,317 
72,953 

4,817 
- 

33,644 
- 
2,703 
59 
- 
- 
2,425,437 

2015 

19,700 

2015 

1,662,783 
800,000 

900,000 
900,000 

6,717 
1,153 

189,754 
- 
42,877 

42,339 
4,453 

16,821 
18 
- 
- 
2,167 
300,000 
1,173,051 

2014 

10,941 

2014 

800,000 
750,000 

- 
50,000 

- 
4,520 

90,306 
- 
- 

8,495 
13,182 

1,777 
80 
- 
- 
1,321 
- 
542,292 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
30

(c)

Related parties (continued)

Other related party transactions (continued)

In addition to the above transactions, guarantees provided by Wuhu Chery and Kenon in respect of the consortium financing agreement were disclosed in Note 23.

The outstanding balances arising from the above transactions at the end of the reporting periods are as follows:

In thousands of RMB

Amounts due from related parties
- trade receivables from Fund
- trade receivables from Chery Auto's subsidiary
- trade receivables from Chery Auto
- other receivables from Chery Auto
- other receivables from Chery Auto's subsidiary

- loan payable to Wuhu Chery
- loan payable to Quantum (2007) LLCs
- payables to Chery Auto
- payables to Kenon Holdings Ltd.
- payables to Fund
- payables to Chery Auto's subsidiary
- payables to SICAR
- receipt in advance from Huiyin
- receipt in advance from Chery Auto's subsidiary

Note

At 31 December
2016 

At 31 December
2015 

3,790 
1,689 
1,144 
9,661 
- 

16,284 

700,000 
700,000 
373,058 
- 
200 
624 
1,570 
26,408 
328 

3,790 
1,832 
- 
3,011 
5 

8,638 

762,783 
745,917 
103,454 
176 
771 
916 
1,570 
- 
- 

1,802,188 

1,615,587 

(i)

F - 180

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
 
  
  
  
  
  
 
 
  
  
  
 
 
  
  
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
  
  
  
 
 
  
  
 
  
  
  
 
 
  
  
  
  
  
 
 
  
  
  
 
 
 
 
 
30

(c)

Related parties (continued)

Other related party transactions (continued)

Notes :

(i)

In 2014, the Group entered into tri-party arrangements with Huiyin and certain car dealers, who are the Group's direct customers. According to such arrangements, Huiyin provides
financing  to  the  dealers  for  their  purchases  from  the  Group.  Huiyin  is  a  subsidiary  of  Chery  Group,  which  is  engaged  in  providing  financing  to  buyers  of  car  manufacturing
companies. Huiyin performs credit assessment on dealers and grants short-term (12-month or less) revolving lines of credit to them. The Group accepts purchase orders from these
dealers only if they have sufficient unused credit from Huiyin.  Upon confirmation of sales orders accepted by the Group, Huiyin remits purchase amount directly to the Group on
behalf of individual dealers, and outstanding loan balances payable of dealers due to Huiyin are increased by the equivalent amount at the same time.  The Group was not responsible
for the repayment of loans between the dealers and Huiyin.

In  March  2016,  in  order  to  help  increase  the  credit  lines  of  dealers  from  Huiyin,  the  Group  offered  guarantees  to  Huiyin  for  selected  dealers  pursuant  to  which  the  Group  was
responsible for any default of the loans released during the period between March 2016 and February 2017, including both principal and interests, for a maximum amount of RMB
700 million which were the amount of total lines of credit of these dealers with Huiyin. The interest rate of loans offered by Huiyin to dealers before and after the Group committed
such guarantee was the same.  As at 31 December 2016, the outstanding loan balance were RMB 483 million and none of them were overdue.  The guarantee was subsequently
extended in February 2017 to February 2018.

  (d)

Relationship with the related parties under the transactions stated in 30(c) above

Name of the entities

Kenon Holdings Ltd.
Wuhu Chery Automobile Investment Co., Ltd.
Quantum (2007) LLC
Wuhu Chery Car Rental Co., Ltd
Chery Investment Co., Ltd in Ordos
Huiyin
SICAR
Fund

31

Subsequent event

Relationship with the Group

Immediate parent company of Quantum
Parent Company
Parent Company
Chery Auto's subsidiary
Chery Auto's subsidiary
Chery Auto's subsidiary
Joint venture invested by Chery Auto
Associate invested by the Group

According to the announcement made by Kenon Holding Ltd. ("Kenon") on 10 March 2017, Kenon and Wuhu Chery Automobile Investment Co., Ltd. will together provide loans of RMB 777
million to the Company. The Company received the first tranche of RMB 388.5 million in March 2017, and a second instalment of RMB 388.5 million will be provided whenever needed.

F - 181

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The registrant hereby certifies that it meets all of the requirements for filing on Form 20-F and that it has duly caused and authorized the undersigned to sign this annual report on its behalf.

SIGNATURES

Date: April 19, 2017

Kenon Holdings Ltd.

By:

/s/ Yoav Doppelt
Name: Yoav Doppelt
Title: Chief Executive Officer

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ITEM 19. Exhibits

Exhibit Number

Index to Exhibits

Description of Document

1.1

2.1

2.2

2.3

2.4

4.1

4.2

4.3

4.4

4.5

4.6

4.7†

4.8†

  Kenon Holdings Ltd.’s Constitution (Incorporated by reference to Exhibit 1.1 to Amendment No. 1 to Kenon’s Registration Statement on Form 20-F, filed on December 19, 2014)

  Form of Specimen Share Certificate for Kenon Holdings Ltd.’s Ordinary Shares (Incorporated by reference to Exhibit 2.1 to Kenon’s Annual Report on Form 20-F for the fiscal

year ended December 31, 2014, filed on March 31, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and Millenium Investments Elad Ltd. (Incorporated by reference to Exhibit 99.5 to

Kenon’s Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and Bank Leumi Le-Israel B.M. (Incorporated by reference to Exhibit 99.6 to Kenon’s

Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Registration Rights Agreement, dated as of January 7, 2015, between Kenon Holdings Ltd. and XT Investments Ltd. (Incorporated by reference to Exhibit 99.7 to Kenon’s Report

on Form 6-K, furnished to the SEC on January 8, 2015)

  Sale, Separation and Distribution Agreement, dated as of January 7, 2015, between Israel Corporation Ltd. and Kenon Holdings Ltd. (Incorporated by reference to Exhibit 99.2 to

Kenon’s Report on Form 6-K, furnished to the SEC on January 8, 2015)

  Loan Agreement, dated as of January 7, 2015, between Israel Corporation Ltd. and Kenon Holdings Ltd, as supplemented by Supplement No. 1 to the Loan Agreement, dated

March 17, 2016 (Incorporated by reference to Exhibit 4.2 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  English translation of Natural Gas Supply Agreement, dated as of January 2, 2006, as amended, among Kallpa Generación S.A., Pluspetrol Peru Corporation S.A., Pluspetrol

Camisea S.A., Hunt Oil Company of Peru L.L.C. Sucursal del Peru, SK Corporation Sucursal Peruana, Sonatrach Peru Corporation S.A.C., Tecpetrol del Peru S.A.C. and Repsol
Exploración Peru Sucursal del Peru (Incorporated by reference to Exhibit 4.3 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on August 14,
2014)

  English translation of Natural Gas Transportation Agreement, dated as of December 10, 2007, as amended, between Kallpa Generación S.A. and Transportadora de Gas del Peru

S.A. (Incorporated by reference to Exhibit 4.4 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on August 14, 2014)

  Turnkey Engineering, Procurement and Construction Contract, dated as of November 4, 2011, among Cerro del Águila S.A., Astaldi S.p.A. and GyM S.A., as amended

(Incorporated by reference to Exhibit 4.5 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  English translation of Contract of Concession, dated as of October 23, 2010, as amended, between the Government of Peru and Kallpa Generación S.A., relating to the provision of
electric energy services to the public (Incorporated by reference to Exhibit 4.6 to Amendment No. 1 to Kenon’s Draft Registration Statement on Form 20-F, filed on August 14,
2014)

  Joint Venture Contract, dated as of February 16, 2007, as amended, between Wuhu Chery Automobile Investment Co., Ltd. and Quantum (2007) LLC (Incorporated by reference

to Exhibit 4.7 to Amendment No. 1 to Kenon’s Registration Statement on Form 20-F, filed on December 19, 2014)

  Gas Sale and Purchase Agreement, dated as of November 25, 2012, among Noble Energy Mediterranean Ltd., Delek Drilling Limited Partnership, Isramco Negev 2 Limited

Partnership, Avner Oil Exploration Limited Partnership, Dor Gas Exploration Limited Partnership, and O.P.C. Rotem Ltd. (Incorporated by reference to Exhibit 10.8 to
Amendment No. 1 to IC Power Pte. Ltd.’s Form F-1, filed on November 2, 2015)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit Number

Description of Document

4.9

4.10

 4.11

 4.12

 4.13

 4.14

 4.15

 4.16

  Indenture, dated as of April 4, 2011, between Inkia Energy Limited, as issuer, and Citibank, N.A.as trustee, relating to Inkia Energy Limited’s 8.375% Senior Notes due 2021

(Incorporated by reference to Exhibit 4.9 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2014, filed on March 31, 2015)

  Facility Agreement, dated as of January 2, 2011, among O.P.C. Rotem Ltd., as borrower, Bank Leumi Le-Israel B.M., as arranger and agent, Bank Leumi Le-Israel Trust Company

Ltd., as security trustee, and the senior lenders named therein (Incorporated by reference to Exhibit 4.10 to Kenon’s Annual Report on Form 20-F for the fiscal year ended
December 31, 2014, filed on March 31, 2015)

  Credit Agreement, dated as of August 17, 2012, among Cerro del Águila S.A., as borrower, Sumitomo Mitsui Banking Corporation, as administrative agent, and other parties party

thereto (Incorporated by reference to Exhibit 4.11 to Kenon’s Annual Report on Form 20-F for the fiscal year ended December 31, 2014, filed on March 31, 2015)

  Guarantee Contract, dated as of June 9, 2015, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd. (Incorporated by reference to Exhibit 4.12 to Kenon’s Annual Report

on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Guarantee Contract, dated as of November 5, 2015, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd. (Incorporated by reference to Exhibit 4.13 to Kenon’s Annual

Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Stock Purchase Agreement, dated as of December 29, 2015, among IC Power Distribution Holdings PTE, Limited, as Purchaser, Inkia Energy, Limited, as Purchaser Guarantor,
DEORSA-DEOCSA Holdings Limited, as Seller, and Estrella Cooperatief BA (Incorporated by reference to Exhibit 4.14 to Kenon’s Annual Report on Form 20-F for the fiscal
year ended December 31, 2015, filed on April 22, 2016)

  Pledge Agreement, dated as of March 17, 2016, between Israel Corporation Ltd. and IC Power Pte. Ltd. (Incorporated by reference to Exhibit 4.15 to Kenon’s Annual Report on

Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

  Security over Shares Agreement, dated as of March 17, 2016, between Israel Corporation Ltd. and Kenon Holdings Ltd. (Incorporated by reference to Exhibit 4.16 to Kenon’s

Annual Report on Form 20-F for the fiscal year ended December 31, 2015, filed on April 22, 2016)

 4.17*

  Amendment and Restatement Agreement, dated as of September 2, 2016, relating to the Loan Agreement dated as of April 22, 2016, between Quantum (2007) LLC, as borrower,

and Ansonia Holdings Singapore B.V., as lender, as amended

 4.18

  Undertaking Agreement, dated as of April 22, 2016, among Qoros Automotive Co., Ltd., Quantum (2007) LLC, Kenon Holdings Ltd., Wuhu Chery Automobile Investment Co.,
Ltd., Chery Automobiles Limited, and Ansonia Holdings Singapore B.V. (Incorporated by reference to Exhibit 4.18 to Kenon’s Annual Report on Form 20-F for the fiscal year
ended December 31, 2015, filed on April 22, 2016)

 4.19*

  Additional Undertaking Agreement, dated as of September 2, 2016, among Qoros Automotive Co., Ltd., Quantum (2007) LLC, Kenon Holdings Ltd., Wuhu Chery Automobile

Investment Co., Ltd., Chery Automobiles Limited, and Ansonia Holdings Singapore B.V.

 4.20*

 4.21*

 4.22*

 4.23**

 4.24**

8.1*

12.1*

12.2*

13.1*

  Fourth Amended and Restated Limited Liability Company Agreement of Quantum (2007) LLC, dated as of September 2, 2016

  Release Agreement, dated December 21, 2016, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd.

  Equity Pledge Contract, dated December 21, 2016, between Quantum (2007) LLC, as Pledgor, and Chery Automobile Co. Ltd., as Pledgee

  Further Release and Cash Support Agreement, dated March 9, 2017, between Kenon Holdings Ltd. and Chery Automobile Co. Ltd.

  The Second Equity Pledge Contract in relation to 700 Million Loan, dated March 9, 2017, between Quantum (2007) LLC, as Pledgor, and Chery Automobile Co. Ltd., as Pledgee

  List of subsidiaries of Kenon Holdings Ltd.

  Rule 13a-14(a)/15d-14(a) Certification of Chief Executive Officer

  Rule 13a-14(a)/15d-14(a) Certification of Chief Financial Officer

  Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit Number

Description of Document

15.1*

15.2*

15.3*

15.4*

15.5*

  Consent of KPMG LLP, Independent Registered Public Accounting Firm of Kenon Holdings Ltd.

  Consent of Somekh Chaikin, a Member Firm of KPMG International

  Consent of KPMG Huazhen LLP, Independent Auditor of Qoros Automotive Co., Ltd.

  Consent of Deloitte, Inc. (Panamá), Independent Registered Public Accounting Firm of the Combined Entities (Distribuidora de Electricidad de Oriente, S.A. and Distribuidora de

Electricidad de Occidente, S.A.)

  Consent of Brightman Almagor Zohar & Co., a Member Firm of Deloitte Touche Tohmatsu, independent auditor of Tower Semiconductor Ltd.

*
**
†

Filed herewith.
To be filed by amendment shortly after the date of this annual report.
Portions of this exhibit have been omitted pursuant to a request for confidential treatment under Rule 24b-2 of the Exchange Act. Omitted information has been filed separately with the SEC.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
          
 
 
 
Exhibit 4.17  

DATED 2 September 2016

AMENDMENT AND RESTATEMENT AGREEMENT 
RELATING TO THE LOAN AGREEMENT 
DATED 22 APRIL 2016

between

QUANTUM (2007) LLC

as Borrower

and

ANSONIA HOLDINGS SINGAPORE B.V.

 as Lender

Skadden, Arps, Slate, Meagher & Flom (UK) LLP 
40 Bank Street 
Canary Wharf 
London E14 5DS

 
 
 
 
 
 
 
 
 
THIS AGREEMENT is dated 2 September 2016 between:

(1)

(2)

QUANTUM (2007) LLC ,   a Delaware limited liability company with file number 4300667 and having its registered office at 16192 Coastal Highway, Lewes, Delaware 19958, United States
of America (the “ Borrower ”); and

ANSONIA HOLDINGS SINGAPORE B.V. ,   incorporated under the laws of the Netherlands (Besloten vennootschap met beperkte aansprakelijkheid) and having its registered office at 1
Temasek Avenue #38-01, Millenia Tower, Singapore 039192 (the “ Lender ”),

(each a “ Party ” and together the “ Parties ”).

BACKGROUND:

This Agreement is supplemental to and amends and restates the loan agreement dated 22 April 2016 between the Borrower and the Lender, as amended by an amendment letter dated 27 June 2016 (the “
Existing Loan Agreement ”).

NOW THIS AGREEMENT WITNESSES as follows:

1.

1.1

INTERPRETATION

Definitions

In this Agreement:

“ Effective Date ” means the date of this Agreement.

“ Loan Agreement ” means the Existing Loan Agreement as amended and restated by this Agreement.

1.2

Construction and Third Party Rights

The provisions of clauses 1.2 ( Construction ) and 1.3 ( Third party rights ) of the Existing Loan Agreement apply to this Agreement as though they were set out in full in this Agreement except
that references to the Existing Loan Agreement are to be construed as references to this Agreement.

1

 
 
 
 
 
 
 
 
 
 
 
 
 
1.3

Definitions

Unless otherwise defined in this Agreement, words and expressions defined in the Existing Loan Agreement shall have the same meanings when used in this Agreement.

2.

AMENDMENT AND RESTATEMENT

With effect on and from the Effective Date:

(a)

(b)

(c)

the Existing Loan Agreement will be amended and restated so that it shall be replaced in its entirety and be read and construed for all purposes as set out in Annexure A ( The Loan
Agreement ) to this Agreement;

any reference to the Existing Loan Agreement in the Finance Documents shall be read and construed as references to the Loan Agreement; and

each Party unconditionally acknowledges and agrees to be bound by the Loan Agreement and to perform its obligations under the Loan Agreement.

3.

MISCELLANEOUS

(a)

(b)

This Agreement is a Finance Document.

The provision of clauses 19 ( Notices ), 21 ( Partial Invalidity) , 22 ( Remedies and Waivers), 23 ( Amendments and Waivers ) and 26.2 ( Jurisdiction ) of the Existing Loan Agreement
shall apply to this letter, as if set out in full and so that references in those provisions to “this Agreement” shall be construed as references to this letter.

(c)

This letter may be executed in any number of counterparts and all of those counterparts taken together shall be deemed to constitute one and the same instrument.

4.

GOVERNING LAW

This Agreement and any non-contractual obligations arising out of or in connection with it are governed by, and shall be construed in accordance with, English law.

2

 
 
 
 
 
 
 
 
 
 
 
 
ANSONIA HOLDINGS SINGAPORE B.V.
as Lender  

By

 Name: Chen Tou Sin David
 Title: Director

SIGNATURES

3

 
 
 
 
 
 
 
 
 
 
QUANTUM (2007) LLC 
as Borrower

By

  Name: R obert R osen
 Title:   M anager

4

 
 
 
 
 
 
 
 
ANNEXURE A 
THE LOAN AGREEMENT

5

DATED 22 April 2016 
as amended by an amendment letter dated 27 June 2016 and 
as amended and restated by an amendment and restatement deed dated  2   September 2016

LOAN AGREEMENT

between

QUANTUM (2007) LLC

as Borrower

and

ANSONIA HOLDINGS SINGAPORE B.V.

 as Lender

Skadden, Arps, Slate, Meagher & Flom (UK) LLP
40 Bank Street
Canary Wharf
London E14 5DS

 
 
 
 
 
 
 
 
 
CONTENTS

Clause

Definitions and Interpretation
The Facility
Purpose
Drawdown
Repayment and mandatory prepayment
Interest
Conversion
Tax and other deductions
Costs and Expenses
Representations and warranties
Information Undertakings
General Undertakings
Events of Default
Trigger Events
Secondary Sale
Limited Recourse
Administration
Assignment and Transfer
Notices
Calculations and Certificates
Partial Invalidity
Remedies and Waivers
Amendments and Waivers
Counterparts
Entire Agreement
Governing Law and Enforcement

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
SCHEDULE 1 Conditions Precedent to initial utilization
SCHEDULE 2 Form of Utilisation Request

Page

1
7
8
8
10
12
12
18
19
19
20
20
23
27
28
29
29
30
30
31
31
31
31
31
31
32
33
35

 
 
 
THIS AGREEMENT is dated 22 April 2016 as amended by an amendment letter dated 27 June 2016 and as amended and restated by an amendment and restatement deed dated  2   September 2016 and
made between:

(1)

(2)

QUANTUM (2007) LLC ,   a Delaware limited liability company with file number 4300667 and having its registered office at 16192 Coastal Highway, Lewes, Delaware 19958, United States
of America (the “ Borrower ”); and

ANSONIA HOLDINGS SINGAPORE B.V. ,   incorporated under the laws of the Netherlands (Besloten vennootschap met beperkte aansprakelijkheid) and having its registered office at 1
Temasek Avenue #38-01, Millenia Tower, Singapore 039192 (the “ Lender ”).

BACKGROUND:

(A)

(B)

(C)

The  Lender  intends  to  make  available  to  the  Borrower  the  Loans  (as  defined  below)  in  order  to  enable  the  Borrower  to  make  corresponding  loans  to  Qoros  pursuant  to  the  Qoros  Loan
Agreements and on the condition that Wuhu Chery Automobile Investment Co. Ltd. make corresponding loans to Qoros, such that the total amount of loans made available to Qoros, subject to
the terms and conditions herein and in the applicable Chery Loan Agreement (defined below), will be up to $150 million.

The Lender intends that the Loans (and corresponding loans to Qoros) will enable Qoros to meet its working capital requirements and enable Qoros to seek additional financing, including a
Qualified Financing.

The  terms  of  this  Agreement  shall  enable  the  Borrower  to  repay  the  Loans  (as  described  herein)  at  par  plus  accrued  interest,  including  upon  any  new  financing  at  Qoros  that  results  in  a
repayment  of  the  corresponding  loan  under  a  Qoros  Loan  Agreement.  In  addition,  upon  any  disposition  by  the  Borrower  of  its  interest  in  Qoros,  the  net  proceeds  will  be  applied  to  repay
amounts outstanding under the Loans (or, if the Loans have been converted into Class A Interests, to redeem such interests).

IT IS AGREED as follows:

1.

1.1

DEFINITIONS AND INTERPRETATION

Definitions

In this Agreement:

“ Additional Chery Loan Agreement ” means each additional term loan facility agreement entered into between Wuhu Chery Automobile Investment Co. Ltd. as lender, the Industrial and
Commercial Bank of China Limited, Changshu Sub-Branch ( 
 ) as entrusted bank and Qoros as borrower with aggregate commitments, in each
case,  of  up  to  an  amount  equal  to  the  RMB  equivalent  of  USD  25,000,000  for  the  purposes  of  Qoros’  ordinary  course  working  capital  requirements  with  terms  that  are  the  same  as  those
contained in the Initial Chery Loan Agreement.

 
 
 
 
 
 
 
 
 
 
 
“ Additional   August 2016   Qoros Loan Agreement ” means the term loan facility agreement entered into between the Borrower as lender and Qoros as borrower for the purposes of Qoros’
ordinary course working capital requirements with aggregate commitments of up to an amount equal to the RMB equivalent of USD 25,000,000 with terms that are substantially the same as
those contained in the Initial Qoros Loan Agreement.

“ Available Commitments ” means, in relation to a Facility, the then undrawn amount of the Commitment relating to that Facility minus, in relation to any proposed Loan under that Facility,
the amount of any other Loan under that Facility that is due and to be made on or before the proposed Utilisation Date.

“ Assignment Agreement ” means the English law governed assignment agreement dated 24 August 2016 granted by the Borrower in favour of the Lender under which the Borrower’s rights
under the Qoros Security Agreement and Qoros Loan Agreements are assigned to the Lender.

“ Business Day ” means a day (other than a Saturday or Sunday) on which banks are open for general business in London, Singapore and Beijing and, in respect of any day on which payment is
to be made under this Agreement, New York City.

“ Chery Loan Agreement ” means:

(a)

(b)

the Initial Chery Loan Agreement; and

each Additional Chery Loan Agreement.

“ Class A Interests ” means Class A membership interests in the Borrower.  

“ Class B Interests ” means Class B membership interests in the Borrower.

“ Commitment ” means:

(a)

(b)

(c)

with respect to Facility A, $25,000,000;

with respect to Facility B, $25,000,000; and

with respect to Facility C, $25,000,000.

“ Conversion Date ” means the date on which the Lender’s Class B Interests are converted to Class A Interests pursuant to Clause 7(a).

“ Default ” means an Event of Default or any event or circumstance specified in Clause 13 ( Events of Default ) which would (with the expiry of a grace period or the giving of notice, making
of any determination or the satisfaction of any other condition) be an Event of Default.

“ Event of Default ” means any event or circumstance specified as such in Clause 13 ( Events of Default ).

2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
“ EXIM Loan Agreement No. 1 ”  means  the  1,200,000,000  RMB  Equivalent  Syndicated  Loan  Agreement  concerning  the  Project  of  Research  and  Development  of  C  Platform  Derivative
Model of Qoros Automotive Co., Ltd. dated 31 July 2014 between, among others, Qoros Automotive Co., Ltd. as Borrower, Export-Import  Bank of China, as arranger,  and Bank of China
Limited Su Zhou Branch, as agent (as amended and/or restated from time to time).

“ EXIM Loan Agreement No. 2 ” means the loan agreement expected to be entered into between, among others, Qoros Automotive Co., Ltd. as Borrower, and Export-Import Bank of China,
as arranger (as amended and/or restated from time to time) or a similar loan agreement.

“ Exim Pledges ” means:

(a)

(b)

the equity pledge contract dated 31 July 2014 granted by the Borrower in favour of Bank of China Limited Su Zhou Branch, as agent, (as amended and/or restated from time to time,
including the amendments approved as set out in the Changshu Economic and Technological Development Zone Management Committee approval dated 13 July 2015) in respect of a
portion of the Borrower’s equity interests in Qoros, which equity pledge was granted to secure the obligations owing in respect of EXIM Loan Agreement No. 1; and

any other pledge granted by the Borrower in favour of the agent or lenders under the EXIM Loan Agreement No. 2, following the date of this Agreement, in respect of a portion of the
Borrower’s equity interests in Qoros (as amended and / or restated from time to time), which equity pledge will be granted to secure the obligations owing in respect of EXIM Loan
Agreement No. 2.

“ Facility ” means Facility A, Facility B or Facility C, as the case may be.

“ Facility A ” means the term loan facility made available under this Agreement as described in Clause 2.1 ( Facility A ).

“ Facility B ” means the term loan facility made available under this Agreement as described in Clause 2.2 ( Facility B ).

“ Facility B Conversion/Repayment Notice ” has the meaning given to that term Clause 7(a)(ii).

“ Facility C ” means the term loan facility made available under this Agreement as described in Clause 2.3 ( Facility C ).

“ Facility C Conversion/Repayment Notice ” has the meaning given to that term in Clause 7(a)(iii).

“ Facility Conversion Notice ” has the meaning given to that term in Clause 7(d).

3

 
 
 
 
 
 
 
 
 
 
 
“ Facility Conversion/Repayment Notices ” means together:

(a)

(b)

the Facility B Conversion/Repayment Notice;

the Facility C Conversion/Repayment Notice,

and “ Facility Conversion/Repayment Notice ” shall mean either one as the context may require.

“ Finance Document ” means this Agreement, the Assignment Agreement and any other document designated as such by the Lender and the Borrower in writing.

“  Financial  Indebtedness  ”  means  any  obligation  to  pay  or  repay  money,  present  or  future,  whether  actual  or  contingent,  sole  or  joint  and  any  guarantee  or  indemnity  of  any  of  those
obligations.

“Further Facility Conversion/Repayment Notice ” has the meaning given to that term in Clause 7(c).” Initial Chery Loan Agreement ” means the term loan facility agreement dated 22
 Changshu  Sub-Branch  ( 
April

 2016  between  Wuhu  Chery  Automobile  Investment

 and  Commercial

 China  Limited,

 the  Industrial

 as  lender,

 Bank  of

 Ltd.

 Co.

 ) as entrusted bank and Qoros as borrower, with aggregate commitments of up to an amount equal to the RMB equivalent of USD 24,000,000.

“ Initial   LLC Agreement ” means the Second Amended and Restated Limited Liability Company Agreement of the Borrower, dated 22 April 2016, between Robert Rosen, as the manager,
and Kenon Holdings Ltd. and the Lender, as the members, as amended and/or restated from time to time.

“ Initial   Qoros Loan Agreement ” means the term loan facility agreement dated 22 April 2016 between the Borrower as lender and Qoros as borrower for the purposes of Qoros’ ordinary
course working capital requirements with aggregate commitments of up to an amount equal to the RMB equivalent of USD 48,000,000.

“ Kenon ”   means Kenon Holdings Ltd., a company incorporated under the laws of Singapore.

“ Legal Reservations ” means:

(a)

(b)

the principle that equitable remedies may be granted or refused at the discretion of a court and the limitation of enforcement by laws relating to insolvency, reorganisation and other
laws generally affecting the rights of creditors;

the time barring of claims under relevant legislation, the possibility that an undertaking to assume liability for or indemnity a person against non-payment of stamp duty may be void
and defences of set-off or counterclaim; and

(c)

similar principles, rights and defences under the laws of any applicable jurisdiction.

4

 
 
 
 
 
 
 
 
 
 
 
 
 
“ LLC Agreement ” means the Fourth Amended and Restated Limited Liability Company Agreement of the Borrower, dated 2 September 2016, between Robert Rosen, as the manager, and
Kenon Holdings Ltd. and the Lender, as the members, as amended and/or restated from time to time.

“ Loan ” means the loan to be made under a Facility or the principal amount outstanding for the time being of such loan.

“ Material Adverse Effect ” means any event or circumstance which, taking into account all relevant circumstances, has a material adverse effect on:

(a)

(b)

(c)

the business, assets or financial condition of the Borrower; or

the ability of the Borrower to perform its payment obligations under the Finance Documents; or

the validity, enforceability or effectiveness or priority or ranking of any Finance Document, any Qoros Loan Agreement or the Qoros Security Agreement.

“ Party ” means a party to this Agreement.

“ People’s Republic of China ” and “ PRC ” means the People’s Republic of China excluding Taiwan, Macau and Hong Kong.

“ Qoros ” means Qoros Automotive Co., Ltd, a company incorporated under the laws of the People’s Republic of China.

“ Qoros Default ” means a “Default” as defined in a Qoros Loan Agreement.

“ Qoros Loan Agreements ” means together:

(a)

(b)

the Initial Qoros Loan Agreement; and

the Additional August 2016 Qoros Loan Agreement,

and “ Qoros Loan Agreement ” shall mean either one as the context may require.

“ Qoros Security Agreement ” means the PRC law governed patent right pledge agreement dated 22 August 2016 between Qoros, the Borrower and Wuhu Chery Automobile Investment Co.
Ltd as amended from time to time.

“ Qualified Financing ”  means  a  financing  pursuant  to  which  a  third  party  investor  subscribes  (or,  in  the  case  of  a  financing  by  way  of  instrument  that  is  convertible  into  equity,  will  on
conversion of such instrument subscribe) for an equity interest in Qoros in an aggregate amount of not less than the Qualified Financing Amount excluding the amount of any conversion of
Financial Indebtedness into equity in Qoros undertaken pursuant to the terms of this agreement.

“ Qualified Financing Amount ” has the meaning given to that term in the Initial Qoros Loan Agreement.

5

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
“ Security Interest ” means any mortgage, pledge, lien, charge (fixed or floating), assignment, hypothecation, set-off or trust arrangement for the purpose of creating security, reservation of
title or security interest or any other agreement or arrangement having a similar effect.

“ Tax ” means any tax, levy, impost, duty or other charge, deduction or withholding of a similar nature to tax (and any related penalty, cost, charge or interest).

“ Termination Date ” means 25 January 2017.

“ Total Commitment ” means $75,000,000 to the extent not cancelled or reduced by the Lender under this Agreement.

“ Trigger Event ” means any event or circumstance specified as such in Clause 14 ( Trigger Events ).

“ Unpaid Sum ” means any sum due and payable but unpaid by the Borrower under the Finance Documents.

“ US Bankruptcy Law ” means the United States Bankruptcy Code of 1978 (Title 11 of the United States Code), any other United States federal or state bankruptcy, insolvency or similar law.

“ Utilisation Date ” means the date on which a Loan is to be made or, as the context requires, was made.

“ Utilisation   Request ” means a notice substantially in the form set out in Schedule 2 ( Form of Request ).

1.2

Construction

(a)

Unless a contrary indication appears, any reference in this Agreement to:

(i)

(ii)

(iii)

the “ Borrower ” or the “ Lender ” shall be construed so as to include its successors in title, heirs, permitted assigns and permitted transferees;

“ assets ” includes present and future properties, revenues and rights of every description;

a “ Finance Document ” or any other agreement or instrument is a reference to that Finance Document or other agreement or instrument as amended, novated, supplemented,
extended or restated;

(iv)

“ indebtedness ” includes any obligation (whether incurred as principal or as surety) for the payment or repayment of money, whether present or future, actual or contingent;

(v)

a  “  person ”  includes  any  person,  firm,  corporation,  government,  state  or  agency  of  a  state  or  any  association,  trust  or  partnership  (whether  or  not  having  separate  legal
personality) or two or more of the foregoing;

6

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(vi)

a “ regulation ” includes any regulation, rule, official directive, request or guideline (whether or not having the force of law, but if not having the force of law being one with
which it is the practice of the relevant person to comply) of any governmental, intergovernmental or supranational body, agency, department or regulatory, self-regulatory or
other authority or organisation;

(vii)

a “ Clause ” or a “ Schedule ” is a reference to a clause of, or a schedule to, this Agreement;

(viii)

“ $ , “ USD ”   and “ US dollar ” denote the lawful currency of the United States of America;

(ix)

“ RMB ” denotes the lawful currency of the People’s Republic of China;

(x)

a provision of law is a reference to that provision as amended or re-enacted; and

(xi)

a time of day is a reference to London time.

(b)

(c)

(d)

Unless a contrary indication appears, a term used in any other Finance Document or in any notice given under or in connection with any Finance Document has the same meaning in
that Finance Document or notice as in this Agreement.

Clause and Schedule headings are for ease of reference only.

A Default or Event of Default is “ continuing ” if it has not been waived in writing.

1.3

Third party rights

(a)

Unless expressly provided to the contrary in this Agreement a person who is not a Party has no right under the Contracts (Rights of Third Parties) Act 1999 to enforce or to enjoy the
benefit of any term of this Agreement.

(b)

Notwithstanding any term of this Agreement the consent of any person who is not a Party is not required to rescind or vary this Agreement at any time.

2.

2.1

THE FACILITY

Facility A

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility A Commitment.

7

 
 
 
 
 
 
 
 
 
 
 
 
 
 
2.2

Facility B

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility B Commitment.

2.3

Facility C

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility C Commitment.

3.

PURPOSE

(a)

The Borrower shall only apply the amounts borrowed by it under each Facility to finance amounts requested to be borrowed by Qoros pursuant to the terms of the applicable Qoros
Loan Agreement; it is understood that such amounts are intended only to be used by Qoros for its ordinary course working capital requirements and not for any other purpose.

(b)

The Lender is not bound to monitor or verify the application of any amount borrowed pursuant to this Agreement.

4.

4.1

DRAWDOWN

Initial Conditions Precedent

The Lender will only be obliged to advance a Loan to the Borrower if:

(a)

(b)

(c)

the Lender has received all of the documents and other evidence listed in Schedule 1 ( Conditions Precedent to initial utilisation ) in form and substance satisfactory to the Lender
(acting reasonably) save to the extent that the Lender has waived receipt of the same;

no Default (and no Qoros Default under either Qoros Loan Agreement) is continuing or would result from the proposed Loan; and

each of the representations and warranties set out in Clause 10 ( Representations and Warranties ) is true and correct on the date of this Agreement and on the Utilisation Date.

4.2

Conditions Precedent to utilisation of a Facility B Loan

In addition to satisfaction of the conditions set out in Clause 4.1 ( Initial Conditions Precedent ) above, the Lender will only be obliged to advance a Loan to the Borrower under Facility B if:

(a)

the proposed Loan is required to fund an amount requested to be borrowed by Qoros pursuant to the Initial Qoros Loan Agreement;

8

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(b)

(c)

(d)

the Lender has received a copy of the applicable executed Additional Chery Loan Agreement that corresponds to the Initial Qoros Loan Agreement;

the Lender in its sole discretion has agreed and consented to the advance of such Loan; and

the Lender has received evidence that the amount requested to be borrowed by Qoros under the Initial Qoros Loan Agreement is equal to the amount to be drawn by Qoros under the
applicable Additional Chery Loan Agreement that corresponds to the Initial Qoros Loan Agreement.

4.3            Conditions Precedent to utilisation of a Facility C Loan

In addition to satisfaction of the conditions set out in Clause 4.1 ( Initial Conditions Precedent ) above, the Lender will only be obliged to advance a Loan to the Borrower under Facility C if:

(a)

(b)

(c)

(d)

the proposed Loan is required to fund an amount requested to be borrowed by Qoros pursuant to the Additional August 2016 Qoros Loan Agreement;

the Lender has received a copy of the applicable executed Additional Chery Loan Agreement that corresponds to the Additional August 2016 Qoros Loan Agreement;

the Lender has received evidence that the amount requested to be borrowed by Qoros under the Additional August 2016 Qoros Loan Agreement is equal to the amount to be drawn by
Qoros under the applicable Additional Chery Loan Agreement that corresponds to the Additional August 2016 Qoros Loan Agreement; and

the Borrower having obtained all required governmental, creditor and partner consents, including appropriate foreign debt quota or other necessary regulatory approvals in connection
with the Additional August 2016 Qoros Loan Agreement.

4.4            Drawdown

(a)

(b)

(c)

(d)

The Borrower may borrow a Loan by giving the Lender a duly completed Utilisation Request. Unless the Lender otherwise agrees, the latest time for receipt by the Lender of such
Utilisation Request is 9.30 a.m. (London time) three Business Days before the proposed Utilisation Date.

No more than one Loan may be drawn under Facility A.

No more than 10 Loans may be drawn under Facility B.

No more than 10 Loans may be drawn under Facility C.

9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
(e)

A Utilisation Request for a Loan is irrevocable and will not be regarded as having been duly completed unless:

(i)

(ii)

(iii)

it specifies a Utilisation Date that is a Business Day prior to the Termination Date;

with respect to a Facility A Loan, the amount of the Loan requested is $25,000,000;

with  respect  to  a  Facility  B  Loan  or  a  Facility  C  Loan  (as  applicable),  the  amount  of  the  Loan  requested  is  a  minimum  of  $100,000  or,  if  less,  the  relevant  Available
Commitments; and

(iii)

the currency of the Loan is USD;

(f)

Subject to satisfaction or waiver of the conditions precedent set out in Clause 4.1 ( Initial Conditions Precedent ), 4.2 ( Conditions Precedent to utilisation of a Facility B Loan ) and /
or 4.3 ( Conditions Precedent to utilisation of a Facility C Loan ) (as applicable), the Lender shall advance the Loan to the Borrower.

4.5            Issuance of Class B Interests

On the first Utilisation Date, the Borrower shall issue to the Lender Class B Interests representing all of the Class B Interests in accordance with the Initial LLC Agreement.

5.            REPAYMENT AND MANDATORY PREPAYMENT

5.1            Repayment of Loans

Subject to Clause 16 ( Limited Recourse ), unless the Loans have been converted into Class A Interests of the Borrower pursuant to the terms of this Agreement and the LLC Agreement, the
Borrower shall repay each Loan in full on the Termination Date.

5.2            No reborrowing

The Borrower may not reborrow any part of any Loan which is repaid or pre-paid.

5.3            Voluntary Prepayment

The Borrower may, by giving not less than 3 Business Days’ prior notice to the Lender, prepay the whole or any part of any Loan.

5.4            Mandatory Prepayment – Excess Loan Amount

If the amount of a Loan (the “ Relevant Loan ”) advanced to the Borrower in connection with the corresponding Qoros Loan Agreement exceeds the amount advanced by the Borrower to
Qoros under that Qoros Loan Agreement (the “ Relevant Qoros Loan ”) (the amount of such excess being the “ Excess Loan Amount ”), the Borrower shall, within 5 Business Days of the
drawdown of the Relevant Qoros Loan, apply an amount equal to the Excess Loan Amount in prepayment of the Relevant Loan.

10

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5.5            Mandatory Prepayment – Qoros repayment

(a)

Subject to Clause 16 ( Limited Recourse ), if the Borrower receives any amount from Qoros (1) as repayment or prepayment of any amounts owing by Qoros to the Borrower under
either Qoros Loan Agreement or (2) in connection with the Borrower’s enforcement of its rights under the Qoros Security Agreement, the Borrower shall, as soon as practicable (and in
any case, within 3 Business Days of receipt of such amount), apply such amount converted into US dollars (a “ Converted Amount ”) in prepayment of the Loans in the following
order:

(i)

(ii)

firstly, in prepayment of the Facility A Loan;

secondly, in prepayment of any Facility B Loan (pro-rata);

(iii)

thirdly, in prepayment of any Facility C Loan (pro-rata); and

(iv)

fourthly, in prepayment of any other amount outstanding under the Finance Documents.

For the avoidance of doubt, if any Converted Amount is greater than the amount required to prepare the Facilities (or any relevant part thereof), the Borrower shall still be required to
pay any such excess amount to the Lender (and the Lender shall be entitled to be paid the same), notwithstanding any provisions to the contrary in the Finance Documents.

(b)

Subject to Clause 16 ( Limited Recourse ), if, in any applicable jurisdiction, it becomes unlawful for the Lender to perform any of its obligations under any of the Finance Documents to
which it is a party or to fund or maintain any Loan, the Lender shall promptly notify the Borrow on becoming aware of that event and the Borrower shall within 3 Business Days repay
such Loan.

5.6          Deemed Repayment

If:

(a)

(b)

then:

(i)

(ii)

(iii)

the Qoros   Loan Agreements are (or deemed, pursuant to Clause 7 ( Conversion )) repaid in full; and

the Borrower has applied all amounts it has received from Qoros under the Qoros Loan Agreements in the prepayment of the Facilities in accordance with Clause 5.5 ( Mandatory
Prepayment –  Qoros repayment ),

all outstanding Loans shall be deemed to be repaid in full;

the Facilities shall be terminated and cancelled in full;

all obligations and amounts owing by the Borrower under the Finance Documents shall be deemed satisfied and discharged in full other than the obligations pursuant to Clause 15 (
Secondary Sale ), which shall survive;

11

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(iv)

the obligations owing by the Borrower under the Assignment Agreement shall be released and discharged in full (and the Lender undertakes to the Borrower that it will execute and
deliver  any  termination,  release  or  other  document,  and  take  all  other  commercially  reasonable  actions,  required  by  the  Borrower  to  give  effect  to  the  release  and  discharge  of  the
Assignment Agreement); and

(v)

any Class B Interests issued to the Lender pursuant to the terms of this Agreement (including any rights attaching thereto) shall be cancelled in accordance with the LLC Agreement.

6.            INTEREST

6.1            Calculation of interest

The rate of interest payable on a Loan is 6.00% per annum.

6.2            Accrued interest

Interest shall accrue daily (calculated on the basis of a 360 day year) and shall be payable on the Termination Date and on any date a Loan is repaid or prepaid (but only in respect of the interest
that has accrued on the amount of such Loan paid or repaid).

6.3            Interest Rate Limitation

Notwithstanding anything herein to the contrary, if at any time the interest rate applicable to any utilisation, together with all fees, charges and other amounts which are treated as interest on
such utilisation under applicable law (collectively the “Charges”), shall exceed the maximum lawful rate (the “ Maximum Rate ”) which may be contracted for, charged, taken, received or
reserved by the Lender holding such utilisation in accordance with applicable law, the rate of interest payable in respect of such utilisation, together with all Charges payable in respect thereof,
shall be limited to the Maximum Rate and, to the extent lawful, the interest and Charges that would have been payable in respect of such utilisation but were not payable as a result of the
operation of this Clause 6.3 shall be cumulated and the interest and Charges payable to such Lender in respect of other utilisation or periods shall be increased (but not above the Maximum Rate
therefor) until such cumulated amount, together with interest thereon at the Maximum Rate (to the extent permitted by applicable law) to the date of repayment, shall have been received by such
Lender.

7.            CONVERSION

(a)

Whilst any amounts owing by the Borrower under this Agreement are outstanding, and subject to paragraph (i) below and the terms of the LLC Agreement:

(i)

upon completion of a Qualified Financing (other than a Qualified Financing that results in repayment of all of the outstanding Loans), the Lender’s percentage of Class B
Interests equal to the following:

X = A / (A + B + C)

12

 
 
 
 
 
 
 
 
 
 
 
 
where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment;

B = the Facility B Commitment; and

C = the Facility C Commitment,

shall automatically convert into Class A Interests (the “ Facility A Class B Conversion ”) with the Lender’s percentage of Class A Interests following the Facility A Class B
Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount outstanding under the Facility A Loan as at the Conversion Date;

B = the amount of all accrued and unpaid interest on the outstanding Facility A Loan as at the Conversion Date;

C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified Financing; and (ii)
the implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the Qualified Financing involves an
investment or financing by a method or means other than the subscription of equity interests in Qoros, the stated equity value of Qoros as set out in such Qualified
Financing as agreed by the Borrower and the Lender), (iii) less a discount of 10%,

with (A + B) / C expressed as a percentage;

(ii)

subject  to  paragraphs  (c)  and  (d)  below,  following  commencement  of  a  Qualified  Financing  (other  than  a  Qualified  Financing  that  results  in  repayment  of  all  of  the
outstanding Loans), but prior to completion of the Qualified Financing, the Lender may by written notice to the Borrower (the “ Facility B Conversion/Repayment Notice ”)
request that either:

(A)

the Lender’s percentage of Class B Interest equal to the following:

X = B / (A + B + C)

13

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment; and

B = the Facility B Commitment

C = the Facility C Commitment,

be converted into Class A Interests and, upon completion of the Qualified Financing, the percentage of Class B Interests held by the Lender calculated in accordance
with the above formula shall be converted into Class A Interests (the “ Facility B Class B Conversion ”) with the Lender’s percentage of Class A Interests following
the Facility B Class B Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount of all outstanding Facility B Loans as at the Conversion Date;

B = the amount of all accrued and unpaid interest on all outstanding Facility B Loans as at the Conversion Date;

C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified Financing;
and (ii) the implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the Qualified Financing
involves an investment or financing by a method or means other than the subscription of equity interests in Qoros, the stated equity value of Qoros as set out
in such Qualified Financing as agreed by the Borrower and the Lender), (iii) less a discount of 10%,

with (A + B) / C expressed as a percentage; or

(B)

the Borrower take all action available to it under clause 11.1 of the Initial Qoros Loan Agreement to require repayment by Qoros of all outstanding Quantum Facility
B Loans (as defined in the Initial Qoros Loan Agreement) (together with accrued and unpaid interest) immediately following completion of the Qualified Financing
and  the  Borrower  shall  undertake  such  action  (the  amount  received  by  the  Borrower  from  Qoros  as  result  of  taking  such  action  being  the  “  Qoros  Facility  B
Repayment Amount ”) and, subject to Clause 16 ( Limited Recourse ), the Borrower shall, within 3 Business Days of the receipt of the Qoros Facility B Repayment
Amount, apply such amount converted into US dollars in prepayment of the Facility B Loans and (pro-rata);

14

 
 
 
 
 
 
 
 
 
 
 
 
 
(iii)

subject  to  paragraphs  (c)  and  (d)  below,  following  commencement  of  a  Qualified  Financing  (other  than  a  Qualified  Financing  that  results  in  repayment  of  all  of  the
outstanding Loans), but prior to completion of the Qualified Financing, the Lender may by written notice to the Borrower (the “ Facility C Conversion/Repayment Notice ”)
request that either:

(A)

the Lender’s percentage of Class B Interest equal to the following:

X = C / (A + B + C)

where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment; and

B = the Facility B Commitment

C = the Facility C Commitment,

be converted into Class A Interests and, upon completion of the Qualified Financing, the percentage of Class B Interests held by the Lender calculated in accordance
with the above formula shall be converted into Class A Interests (the “ Facility C Class B Conversion ”) with the Lender’s percentage of Class A Interests following
the Facility C Class B Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount of all outstanding Facility C Loans as at the Conversion Date;

B = the amount of all accrued and unpaid interest on all outstanding Facility C Loans as at the Conversion Date;

15

 
 
 
 
 
 
 
 
 
 
 
 
 
C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified Financing;
and (ii) the implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the Qualified Financing
involves an investment or financing by a method or means other than the subscription of equity interests in Qoros, the stated equity value of Qoros as set out
in such Qualified Financing as agreed by the Borrower and the Lender), (iii) less a discount of 25%,

with (A + B) / C expressed as a percentage; or

(B)

the Borrower take all action available to it under clause 11.1 of the Additional August 2016 Qoros Loan Agreement to require repayment by Qoros of all outstanding
Loans  (as  defined  in  the  Additional  August  2016  Qoros  Loan  Agreement)  (together  with  accrued  and  unpaid  interest)  immediately  following  completion  of  the
Qualified  Financing  and  the  Borrower  shall  undertake  such  action  (the  amount  received  by  the  Borrower  from  Qoros  as  result  of  taking  such  action  being  the  “
Qoros Facility C Repayment Amount ”) and, subject to Clause 16 ( Limited Recourse ), the Borrower shall, within 3 Business Days of the receipt of the Qoros
Facility C Repayment Amount, apply such amount converted into US dollars in prepayment of the Facility C Loans and (pro-rata).

The Borrower hereby undertakes to promptly notify the Lender on becoming aware that the terms of a Qualified Financing have been agreed, and further undertakes to set out
in such notification all material details and terms of the proposed Qualified Financing (including expected completion date of the Qualified Financing) as the Borrower is then
aware of.

If:

(i)

(ii)

the terms of the Qualified Financing as proposed at the time of a Facility Conversion/Repayment Notice subsequently change in any material respect at any time
prior to completion of the Qualified Financing; or

completion  of  the  Qualified  Financing  has  not  occurred  prior  to  the  anticipated  date  of  completion  of  the  Qualified  Financing  at  the  time  a  Facility
Conversion/Repayment Notice was provided to the Borrower,

(b)

(c)

16

 
 
 
 
 
 
 
then at, or prior to, completion of the Qualified Financing, the Lender may submit a further notice (the “ Further Facility Conversion/Repayment Notice ”) to the Borrower:

(x)

requesting that the Borrower disregard the relevant Further Facility Conversion/Repayment Notice (and confirming that the Borrower’s failure to comply with such
Facility Conversion/Repayment Notice shall not constitute a breach of any term of this Agreement); and

(1)

(2)

in respect of a Facility B Conversion/Repayment Notice, setting out a new election under either paragraph (a)(ii)(A) or (a)(ii)(B); or

in respect of a Facility C Conversion/Repayment Notice, setting out a new election under either paragraph (a)(iii)(A) or (a)(iii)(B),

and the Borrower shall comply with such Further Facility Conversion/Repayment Notice in accordance with paragraph (a)(ii)(A), (a)(ii)(B), (a)(iii)(A) or (a)(iii)(B) (as
applicable).

(d)

If the Borrower has not repaid: (1) the Facility B Loans within a reasonable period after the Lender has made an election for such repayment under paragraph (a)(ii)(B); or (2)
the Facility C Loans within a reasonable period after the Lender has made an election for such repayment under paragraph (a)(iii)(B), (in each case, whether pursuant to a
Facility Conversion/Repayment Notice or a Further Facility Conversion/Repayment Notice) then the Lender may at any time thereafter submit a further notice (the “ Facility
Conversion Notice ”) to the Borrower:

(i)

requesting that the Borrower disregard the relevant Facility Conversion/Repayment Notice or Further Conversion/Repayment Notice, as applicable (and confirming
that the Borrower’s failure to comply with such Facility Conversion/Repayment Notice or Further Conversion/Repayment Notice, as applicable, shall not constitute a
breach of any term of this Agreement); and

(ii)

setting out a new election under paragraph (a)(ii)(A) or (a)(iii)(A) (as applicable),

and  the  Borrower  shall  comply  with  such  Facility  Conversion  Notice  in  accordance  with  paragraph  (a)(ii)(A)  or  (a)(iii)(A),  as  applicable.  For the  avoidance  of  doubt,  the
Parties agree that a Facility Conversion Notice may be sent by the Lender even after, and notwithstanding, the completion of a Qualified Financing.

(e)

Upon the Facility A Class B Conversion pursuant to paragraph (a)(i) above and the LLC Agreement:

(i)

(ii)

the Facility A Loan shall be deemed to be repaid in full;

Facility A shall be terminated and cancelled in full.

17

 
 
 
 
 
 
 
 
 
 
 
(f)

Upon the Facility B Class B Conversion pursuant to paragraph (a)(ii)(A) above and the LLC Agreement:

(i)

(ii)

all outstanding Facility B Loans shall be deemed to be repaid in full; and

Facility B shall be terminated and cancelled in full.

(g)

Upon the Facility C Class B Conversion pursuant to paragraph (a)(iii)(A) above and the LLC Agreement:

(i)

(ii)

all outstanding Facility C Loans shall be deemed to be repaid in full; and

Facility C shall be terminated and cancelled in full.

(h)

Upon the later of a Facility A Class B Conversion, Facility B Class B Conversion and Facility C Class B Conversion:

(i)

(ii)

all  obligations  and  amounts  owing  by  the  Borrower  under  the  Finance  Documents  shall  be  deemed  satisfied  and  discharged  in  full  other  than  the  obligations  pursuant  to
Clause 15 ( Secondary Sale) , which shall survive;

the  obligations  owing  by  the  Borrower  under  the  Assignment  Agreement  shall  be  released  and  discharged  in  full  (and  the  Lender  undertakes  to  the  Borrower  that  it  will
execute and deliver any termination, release or other document, and take all other commercially reasonable actions, required by the Borrower to give effect to the release and
discharge of the Assignment Agreement); and

(iii)

any Class B Interests issued to the Lender pursuant to the terms of this Agreement (including any rights attaching thereto) shall be cancelled.

(i)

If, upon completion of a Qualified Financing, the Qoros Loan Agreements are repaid in full:

(i)

(ii)

Clause 7(a), (b), (c), (d), (e), (f), (g) and (h) shall not apply;

the amounts received by the Borrower from Qoros as a result of the repayment of the Qoros Loan Agreements shall be applied in accordance with Clause 5.5 ( Mandatory
Prepayment – Qoros repayment ) (and, for the avoidance of doubt, Clause 5.6 ( Deemed Repayment ) shall apply).

8.

TAX AND OTHER DEDUCTIONS

Each Party shall pay all its own present and future Tax as may be levied by a respective government or governmental body in relation to the Finance Documents.

18

 
 
 
 
 
 
 
 
 
 
 
 
 
 
9.

COSTS AND EXPENSES

Each Party shall pay its own costs and expenses that it incurs in connection with the negotiation, preparation and execution of this agreement and/or the other Finance Documents.

10.

REPRESENTATIONS AND WARRANTIES

The  Borrower  makes  the  representations  and  warranties  set  out  in  this  Clause  10  to  the  Lender  on  the  date  of  this  Agreement  and  on  each  Utilisation  Date  by  reference  to  the  facts  and
circumstances then existing.

10.1

Status

(a)

(b)

It is a limited liability company, duly formed and validly existing under the laws of the State of Delaware.

It has the power to own its assets and carry on its business as it is being conducted.

10.2

Binding obligations

Subject to the Legal Reservations, the obligations expressed to be assumed by it in each Finance Document, the Qoros Security Agreement and the Qoros Loan Agreements are legal, valid,
binding and enforceable obligations.

10.3

Non-conflict with other obligations

The  entry  into  and  performance  by  it  of,  and  the  transactions  contemplated  by,  each  of  the  Finance  Documents,  the  Qoros  Loan  Agreements,  the  Qoros  Security  Agreement  and  any  other
material contract or agreement to which it is a party do not conflict with:

(a)

(b)

any law or regulation applicable to it; or

the constitutional documents of the Borrower.

10.4

Power and authority

It has the power to enter into, perform and deliver, and has taken all necessary action to authorise the entry into, performance and delivery of:

(a)

(b)

each Finance Document to which it is a party and the transactions contemplated by those Finance Documents; and

the Qoros Loan Agreements and Qoros Security Agreement and the transactions contemplated by the Qoros Loan Agreements and Qoros Security Agreement.

19

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10.5

Approval of this Agreement as a related party transaction

The Loans and other transactions contemplated by this Agreement and related agreements have been approved by Kenon in accordance with: (a) all applicable laws and regulations; (b) its
policies and procedures applicable to related party transactions, as described in Kenon’s annual report on Form 20-F for the fiscal year ended 31 December 2014 filed with the U.S. Securities
and Exchange Commission on 31 March 2015; and (c) all applicable stock exchange rules applicable to the approval of related party transactions.

11.

INFORMATION UNDERTAKINGS

The undertakings in this Clause 11 remains in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

11.1

Notification of default

The Borrower shall notify the Lender of:

(a)

(b)

any Default (and the steps, if any, being taken to remedy it);

any Qoros Default under either Qoros Loan Agreement or any default under the Qoros Security Agreement,

in each case, promptly upon becoming aware of its occurrence.

11.2

Information: miscellaneous

The Borrower shall supply to the Lender:

(a)

(b)

promptly upon becoming aware of them, the details of any litigation, arbitration or administrative proceedings which are current, threatened or pending against the Borrower or Qoros,
and which, if adversely determined, are reasonably likely to have a Material Adverse Effect; and

promptly  on  request,  such  further  information  regarding  the  financial  condition,  assets  and  operations  of  the  Borrower  and,  to  the  extent:  (i)  such  information  is  available  to  the
Borrower; and (ii) disclosure of such information would not breach the terms of any agreement or arrangement entered into by the Borrower, Qoros as the Lender may reasonably
request.

12.

GENERAL UNDERTAKINGS

The undertakings in this Clause 12 remain in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

12.1

Compliance with laws

The Borrower shall comply in all respects with all laws to which it may be subject, if failure so to comply would impair its ability to perform its obligations under the Finance Documents, the
Qoros Security Agreement or either Qoros Loan Agreement.

20

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
12.2

Acquisitions

The Borrower shall not, without the prior written consent of the Lender:

(a)

(b)

acquire a company or any shares or securities or a business or undertaking (or, in each case, any interest in any of them) (other than shares in Qoros); or

incorporate a company.

12.3

Disposals

(a)

(b)

The  Borrower  shall  not  enter  into  a  single  transaction  or  a  series  of  transactions  (whether  related  or  not)  and  whether  voluntary  or  involuntary  to  sell,  lease,  transfer  or  otherwise
dispose of any asset, including all or a portion of its legal or beneficial interests in Qoros.

Paragraph (a) above does not apply to any sale, lease, transfer or other disposal made by the Borrower pursuant to the terms of the Finance Documents or the LLC Agreement or to the
Exim Pledges.

12.4

Holding company status

The   Borrower undertakes that:

(a)

(b)

it is and will remain a special purpose, holding company; and

it will not incur any liabilities except: (i) as contemplated in the Finance Documents, the LLC Agreement, the Qoros Loan Agreements, the Qoros Security Agreement and any other
agreement entered into by the Borrower in connection with the aforementioned documents (including the “finance documents” as defined in the Qoros Loan Agreements); and (ii) for
liabilities that arise in the ordinary course of acting as a special purpose, holding company.

12.5

Membership interests

The Borrower shall not issue any membership interests except:

(a)

(b)

as permitted pursuant to the terms of a Finance Document; or

in accordance with the terms of the LLC Agreement.

12.6

Change of business

The Borrower shall ensure that no substantial change is made to the general nature of the business of the Borrower from that carried on at the date of this Agreement.

21

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
12.7

Qoros Security Agreement

(a)

(b)

The Borrower shall not (and shall not take any action to) enforce, discharge, release or terminate any of its rights under the Qoros Security Agreement except: (i) in accordance with
and pursuant to Clause 14.4 ( Enforcement under Qoros Security Agreement ); (ii) to the extent required in order to comply with Clause 12.10 ( Undertaking to amend Qoros Security
Agreement ); or (iii) with the prior written consent of the Lender.

The Borrower shall notify the Lender promptly on becoming aware of any request to enforce, discharge, release or terminate any of the Borrower’s rights under the Qoros Security
Agreement other than a request to enforce, discharge, release or terminate from the Lender pursuant to Clause 14.4 ( Enforcement under Qoros Security Agreement ) or in connection
with Clause 12.10 ( Undertaking to amend Qoros Security Agreement ).

12.8

Qoros Loan Agreements

The Borrower shall:

(a)

(b)

(c)

(d)

not amend the terms of, or waive any of its rights under, either Qoros Loan Agreement without the prior written consent of the Lender;

not waive any default or event of default (howsoever described) that has occurred under either Qoros Loan Agreement without the prior written consent of the Lender;

not take any other action in connection with either Qoros Loan Agreement that may adversely affect the rights and interests of the Lender; and

use any amounts borrowed by it under each Facility to finance amounts requested to be borrowed by Qoros pursuant to the terms of the Qoros Loan Agreements.

12.9

Conditions Subsequent

The Borrower shall:

(a)

(b)

use its best efforts to ensure that   within 134 days of the date of this Agreement (the “ CS Period ”), it will provide the Lender with a copy of the duly executed Qoros Security
Agreement;

within 5 days of the date of execution of the Qoros Security Agreement, deliver to the Lender the Assignment Agreement, in a form substantially the same as that agreed to by the
Lender and the Borrower pursuant to Paragraph 3 (a) of Schedule 1 ( Conditions precedent to initial utilisation ), duly executed by the Borrower,

except that:

(i)

the period between: (1) the date a definitive and binding agreement relating to a Qualified Financing is signed; and (2) the date on which such agreement is terminated or it is otherwise
apparent that the proposed Qualified Financing will not be consummated (the “ QF Termination Date ”), shall not be accounted for in (and shall be excluded from) the calculation and
determination  of  the  CS  Period  (it  being  agreed,  for  the  avoidance  of  doubt,  that  any  time  period  after  such  QF  Termination  Date  shall  be  accounted  for  in  the  calculation  and
determination of the CS Period); and

22

 
 
 
 
 
 
 
 
 
 
 
 
 
 
(ii)

following the completion of a Qualified Financing, the obligations in paragraphs (a) and (b) above shall not apply.

12.10 Undertaking to amend Qoros Security Agreement

Following:

(a)

(b)

the due execution of the Additional August 2016 Qoros Loan Agreement;

the Borrower having obtained all required governmental, creditor and partner approvals and consents, including appropriate foreign debt quota or other necessary regulatory approvals
in connection with the Additional August 2016 Qoros Loan Agreement; and

(c)

the registration of the Additional August 2016 Qoros Loan Agreement with the relevant PRC government body,

the Borrower shall, upon written request by the Lender, use its best efforts to amend the Qoros Security Agreement so that the Qoros Security Agreement secures all present and future moneys,
debts  and  liabilities  due,  owing  or  incurred  by  Qoros  under  or  in  connection  with  the  Additional  2016  Qoros  Loan  Agreement  (the  required  amendments  being  the  “  Qoros  Security
Amendments ”), including using its best efforts to obtain the approval of the State Intellectual Property Office of the PRC (“ SIPO ”) and all other governmental, creditor and partner approvals
and consents required in connection with the Qoros Security Amendments (a failure to obtain such approvals and consents shall not be considered a breach by the Borrower of its obligations
under this Clause 12.10).

13.

EVENTS OF DEFAULT

Each of the events or circumstances set out in Clauses 13.1 ( Non-payment) to 13.14 ( Assignment Agreement ) (inclusive) is an Event of Default.

13.1

Non-payment

Subject to Clause 5.6 ( Deemed Repayment ) and Clause 16 ( Limited Recourse ), the Borrower does not pay on the due date any amount payable pursuant to a Finance Document at the place
and in the currency in which it is expressed to be payable unless:

(a)

(b)

its failure to pay is caused by administrative or technical error; and

payment is made within 5 Business Days of its due date.

23

 
 
 
 
 
 
 
 
 
 
 
 
13.2

Other obligations

(a)

(b)

The  Borrower does  not comply  with  any provision  of this  Agreement  (other  than  those referred  to  in Clause  13.1 (  Non-payment ), Clause  13.10  ( Disposals ) and Clause  13.14  (
Assignment Agreement )).

No Event of Default under paragraph (a) above will occur if the failure to comply is capable of remedy and is remedied within 15 Business Days of the earlier of: (i) the Lender giving
notice to the Borrower; and (ii) the Borrower becoming aware of the failure to comply.

13.3

Misrepresentation

(a)

(b)

Any representation or statement made or deemed to be made by the Borrower in this Agreement is or proves to have been materially incorrect or materially misleading when made or
deemed to be made.

No Event of Default under paragraph (a) above will occur if the circumstances giving rise to the misrepresentation or misstatement are capable of remedy and are remedied within 15
Business Days of the earlier of:

(i)

(ii)

13.4

Cross default

the Lender giving written notice of the failure by the Borrower; and

the Borrower becoming aware of the misrepresentation or misstatement.

(a)

(b)

(c)

Any Financial Indebtedness of the Borrower (other than Financial Indebtedness of the Borrower under this Agreement) is not paid when due nor within any originally applicable grace
period.

Any Financial Indebtedness of the Borrower (other than Financial Indebtedness of the Borrower under this Agreement) is declared to be or otherwise becomes due and payable prior to
its specified maturity as a result of an event of default (however described).

No Event of Default will occur under this Clause 13.4 if the aggregate amount of Financial Indebtedness falling within paragraphs (a) or (b) above is less than RMB 50,000,000 (or its
equivalent in any other currency or currencies).

13.5

Insolvency

(a)

Subject to Clause 16 ( Limited Recourse ), the Borrower is unable or admits inability to pay its debts as they fall due or is declared to be unable to pay its debts under applicable law or,
by reason of actual or anticipated financial difficulties, suspends making payments on any of its debts (for the avoidance of doubt, the application of Clause 16 ( Limited Recourse )
shall  not  constitute  a  suspension  of  the  payment  of  the  Borrower’s  debt)  or  commences  negotiations  with  one  or  more  of  its  creditors  with  a  view  to  rescheduling  any  of  its
indebtedness (other than with the Lender).

24

 
 
 
 
 
 
 
 
 
 
 
 
 
(b)

A moratorium is declared in respect of any indebtedness of the Borrower.

13.6

Insolvency Proceedings

(a)

The filing of an involuntary proceeding is made in a court of competent jurisdiction in the United States seeking relief under US Bankruptcy Law in respect of the Borrower and either
such proceeding shall continue undismissed for 60 days or an order or decree approving or ordering any of the foregoing shall be entered or the Borrower shall consent to the institution
of, or fail to contest in a timely and appropriate manner, any such involuntary proceeding.

(b)

The filing of a voluntary petition by the Borrower is made under US Bankruptcy Law.

13.7

Unlawfulness

(a)

(b)

(c)

It is or becomes unlawful for the Borrower to perform any of its material obligations under any Finance Document.

Subject to the Legal Reservations, any obligation or obligations of the Borrower under any Finance Document are not or cease to be legal, valid, binding or enforceable.

Any Finance Document ceases to be in full force and effect.

13.8

Repudiation

The Borrower repudiates a Finance Document to which it is a party or evidences an intention to repudiate a Finance Document to which it is a party.

13.9

Expropriation

The authority or ability of the Borrower to conduct its business is limited or wholly or substantially curtailed by any seizure, expropriation, nationalisation,  intervention, restriction or other
action  by  or  on  behalf  of  any  governmental,  regulatory  or  other  authority  or  other  person  in  relation  to  it  or  any  of  its  assets  which  limitation  or  curtailment  (taking  into  consideration  any
compensation or payment received in respect thereof) has, or is reasonably expected to have, a Material Adverse Effect.

13.10 Disposals

(a)

(b)

The Borrower sells, transfers or otherwise disposes of any portion of its legal or beneficial interests in Qoros in any single transaction or series of related transactions.

No Event of Default will occur under paragraph (a) above if the sale, transfer or other disposal of the Borrower’s legal or beneficial interests in Qoros is made by the Borrower pursuant
to the terms of the Finance Documents or the LLC Agreement or to the Exim Pledges.

25

 
 
 
 
 
 
 
 
 
 
 
 
 
 
13.11

Interests in Qoros

The Borrower creates or permits to subsist any Security Interest over its legal or beneficial interests in Qoros except:

(a)

(b)

(c)

as otherwise permitted under this Agreement, any other Finance Document or the LLC Agreement;

pursuant to the Exim Pledges; or

with prior written consent of the Lender.

13.12 Qoros Loan Agreements

The Borrower:

(a)

(b)

amends the terms of, or waives any of its rights under, either Qoros Loan Agreement without the prior written consent of the Lender; or

waives any default or event of default (howsoever described) that has occurred under either Qoros Loan Agreement without the prior written consent of the Lender.

13.13 Material Adverse Effect

Any event or circumstance occurs which has, or is reasonably expected to have, a Material Adverse Effect.

13.14 Assignment Agreement

The Borrower shall not have delivered to the Lender the Assignment Agreement (in a form substantially the same as that agreed to by the Lender and the Borrower pursuant to Paragraph 3(a) of
Schedule 1 ( Conditions precedent to initial utilisation )) duly executed by the Borrower within 5 days of the date of execution of the Qoros Security Agreement.

13.15 Acceleration

(a)

Subject to Clause 16 ( Limited Recourse ), whilst an Event of Default is continuing the Lender may, by written notice to the Borrower:

(i)

(ii)

cancel the Facilities whereupon the Facilities shall immediately be cancelled;

declare that all or part of any Loan (to the extent not repaid and to the extent the Facility A Class B Conversion and, if applicable, the Facility B Class B Conversion and/or
Facility C Class B Conversion has not occurred), together with accrued and unpaid interest, and all other amounts accrued or outstanding under the Finance Documents be
immediately due and payable, whereupon they shall become immediately due and payable; and/or

26

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(iii)

declare that all or part of any Loan (to the extent not repaid) be payable on demand, whereupon it shall immediately become payable on demand; and/or

(iv)

exercise any or all of its rights, remedies, powers or discretions under the Finance Documents.

(b)

If an Event of Default occurs under Clause 13.6:

(i)

(ii)

the Total Commitments shall immediately be cancelled; and

all of the Loans, together with accrued interest and all other amounts accrued under the Finance Documents, shall be immediately due and payable,

in each case automatically and without any direction, notice, declaration or other act.

14.

TRIGGER EVENTS

Each of the events or circumstances set out in Clauses 14.1, 14.2 and 14.3 is a Trigger Event.

14.1

Acceleration of a Qoros Loan Agreement due to certain Events of Default

A Qoros Default pursuant to Section 10.5, 10.6 or 10.7 of either Qoros Loan Agreement has occurred and is continuing.

14.2

Qoros Security Agreement

The Borrower has not delivered to the Lender within 134 days of the date of this Agreement (the “ Relevant Period ”) a copy of the duly executed Qoros Security Agreement, except that:

(a)

the period between: (1) the date a definitive and binding agreement relating to a Qualified Financing is signed; and (2) the QF Termination Date, shall not be accounted for in (and shall
be excluded from) the calculation and determination of the Relevant Period (it being agreed, for the avoidance of doubt, that any time period after such QF Termination Date shall be
accounted for in the calculation and determination of the Relevant Period); and

(b)

following the completion of a Qualified Financing, the events and circumstances described in this Clause 14.2 shall no longer constitute a Trigger Event.

27

 
 
 
 
 
 
 
 
 
 
 
 
 
14.3

Other obligations

(a)

(b)

The Borrower does not comply with Clause 12.10 ( Undertaking to amend Qoros Security Agreement ).

No Trigger Event under paragraph (a) above will occur if the failure to comply is capable of remedy and is remedied within 15 Business Days of the earlier of: (i) the Lender giving
notice to the Borrower; and (ii) the Borrower becoming aware of the failure to comply.

14.4

Enforcement under the Qoros Security Agreement

Subject to Clause 16 ( Limited Recourse ), whilst a Trigger Event is continuing, the Lender may, by written notice to the Borrower:

(a)

request that the Borrower:

(i)

(ii)

(iii)

enforce the Qoros Security Agreement in accordance with the terms of the Qoros Security Agreement; and / or

take any action available to the Borrower under and in accordance with the terms of the Qoros Security Agreement and/or the Qoros Loan Agreements; and / or

take any actions to cause the Lender to have, or to direct the exercise of, any voting, consent or other similar rights to which the Borrower has as a creditor of Qoros in respect
of the Qoros Loan Agreements,

and the Borrower shall comply with such request as soon as reasonably practicable following such written notice (to the extent permitted under, and in accordance with, the terms of
the Qoros Security Agreement and the Qoros Loan Agreements).

15.

SECONDARY SALE

The Borrower acknowledges and agrees that: (i) pursuant to Clause 12.3 ( Disposals ), the Borrower is restricted from selling, leasing, transferring or otherwise disposing of any asset, including
all or a portion of its legal or beneficial interests in Qoros without the prior written consent of the Lender; and (ii) to the extent that the Lender provides its prior written consent for any such
sale, lease, transfer or disposal, the Company shall be required to use any such proceeds (the “ Transfer Proceeds ”):

(a)

(b)

if prior to the later of: (i) the Facility A Class B Conversion; (ii) the Facility B Class B Conversion; and (iii) the Facility C Class B Conversion, for the repayment of the outstanding
amount, together with accrued and unpaid interest, under any Loan prior to using the Transfer Proceeds for any other purpose; and

if  following  the  later  of:  (i)  the  Facility  A  Class  B  Conversion;  (ii)  the  Facility  B  Class  B  Conversion;  and  (iii)  the  Facility  C  Class  B  Conversion,  for  the  redemption  of  Class  A
Interests at the then implied value of the Class A Interests in accordance with the LLC Agreement prior to using the Transfer Proceeds for any other purpose.

28

 
 
 
 
 
 
 
 
 
 
 
 
 
16.

LIMITED RECOURSE

Notwithstanding any other provision of this Agreement or any other Finance Document:

(a)

(b)

(c)

the Borrower shall only be required to repay or prepay a Loan and pay any other amounts due and payable under the Finance Document from, and only to the extent of, the amounts the
Borrower receives from Qoros under the Qoros Loan Agreements;

any claim by the Lender and any liability and obligation owing by the Borrower under the Finance Documents is limited to the amounts the Borrower receives from Qoros under the
Qoros Loan Agreements and the assets the subject of the Assignment Agreement (and the Lender shall have no further rights or remedies against the Borrower, and the Borrower shall
have no liability or obligation, for any further sum or amount under, or in connection with, the Finance Documents (a “ Further Sum ” )); and

the Lender shall not take any steps against the Borrower to recover any Further Sum (in particular, the Lender shall not institute against or join any person in instituting against the
Borrower any bankruptcy, reorganisation, arrangement, insolvency, administration, moratorium, liquidation, dissolution or similar proceedings, nor shall any such person be entitled to
make any claim in respect of, any Further Sum against the assets of the Borrower).

17.

ADMINISTRATION

17.1

Place of payments

All payments to be made by the Borrower under this Agreement shall be made to such account at such office or bank as the Lender may notify to the Borrower for this purpose form time to
time.

17.2

Business Days

(a)

(b)

Any payment which is due to be made on a day that is not a Business Day shall be made on the next Business Day in the same month (if there is one) or the preceding Business Day (if
there is not).

During any extension of the due date for payment of any principal or Unpaid Sum under this Agreement interest is payable on the principal or Unpaid Sum at the rate payable on the
original due date.

29

 
 
 
 
 
 
 
 
 
 
17.3

Currency of account

(a)

Subject to paragraph (b) below, and save as otherwise agreed by the Lender and the Borrower in relation to any prepayment due under this Agreement, USD is the currency of account
and payment for any sum due from the Borrower under any Finance Document.

(b)

Each payment in respect of costs, expenses or Taxes shall be made in the currency in which the costs, expenses or Taxes are incurred.

18.

ASSIGNMENT AND TRANSFER

18.1

Lender

The Lender may not assign or transfer any of its rights and obligations under any Finance Document to any person without the prior written consent of the Borrower.

18.2

Borrower

The Borrower may not assign or transfer any of its rights and obligations under any Finance Document to any person without the prior written consent of the Lender.

19.

NOTICES

19.1

Communications in writing

Any communication to be made under or in connection with the Finance Documents shall be made in writing and, unless otherwise stated, may be made by fax or international express courier
service.

19.2

Addresses

The address (and the department or officer, if any, for whose attention the communication is to be made) of each Party for any communication or document to be made or delivered under or in
connection with the Finance Documents is that identified with its name in the signature pages of this Agreement or any fax number or substitute address or department or officer as the Party
may notify to the other Party by not less than five Business Days’ notice.

19.3

Delivery

Any communication or document made or delivered by one person to another under or in connection with the Finance Documents will only be effective:

(a)

(b)

(c)

if by way of fax or email, when received in legible form;

if by way of personal delivery or post, when received; or

if by way of international express courier service, when it has been delivered at the relevant address as evidenced by the courier service records.

30

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
19.4

Language

All notices and communications pursuant to the Finance Documents shall be in the English language.

20.

CALCULATIONS AND CERTIFICATES

20.1

Accounts

In any litigation or arbitration proceedings arising out of or in connection with the Finance Documents, the entries made in the accounts maintained by the Lender are prima facie evidence of the
matters to which they relate.

20.2

Certificates and Determinations

Any certification or determination by the Lender of a rate or amount under the Finance Documents is, in the absence of manifest error, conclusive evidence of the matters to which it relates.

21.

PARTIAL INVALIDITY

If, at any time, any provision of this Agreement is or becomes illegal, invalid or unenforceable in any respect under any law of any jurisdiction, neither the legality, validity or enforceability of
the remaining provisions nor the legality, validity or enforceability of such provision under the law of any other jurisdiction will in any way be affected or impaired.

22.

REMEDIES AND WAIVERS

No failure to exercise, nor any delay in exercising, on the part of the Lender, any right or remedy under the Finance Documents shall operate as a waiver, nor shall any single or partial exercise
of any right or remedy prevent any further or other exercise or the exercise of any other right or remedy. The rights and remedies provided in the Finance Documents are cumulative and not
exclusive of any rights or remedies provided by law.

23.

AMENDMENTS AND WAIVERS

Any term of this Agreement may be amended or waived only with the consent of the Lender and the Borrower in writing.

24.

COUNTERPARTS

This Agreement may be executed in any number of counterparts, and this has the same effect as if the signatures on the counterparts were on a single copy of this Agreement.

25.

ENTIRE AGREEMENT

(a)

This Agreement, together with the other Finance Documents, constitutes the entire agreement between the Parties in relation to the obligations of each Party under this Agreement and
supersedes any previous agreement, whether express or implied, between the Parties.

31

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(b)

Each Party acknowledges that in agreeing to enter into this Agreement it has not relied on any representation, warranty, collateral contract or other assurance (except those set out in
this Agreement and the documents referred to in it) made by or on behalf of any other Party before the signature of this Agreement. Each Party waives all rights and remedies which,
but for this Clause, might otherwise be available to that Party in respect of any such representation, warranty, collateral contract or other assurance.

(c)

Nothing in this Clause limits or excludes any liability for fraud.

26.

GOVERNING LAW AND ENFORCEMENT

26.1

Governing Law

This Agreement and any non-contractual obligations arising out of or in connection with it are governed by, and shall be construed in accordance with, English law.

26.2

Jurisdiction

(a)

(b)

(c)

The courts of England have exclusive jurisdiction to settle any dispute arising out of or in connection with this Agreement (including a dispute relating to the existence, validity or
termination of this Agreement or any non-contractual obligation arising out of or in connection with this Agreement) (a “ Dispute ” ).

The Parties agree that the courts of England are the most appropriate and convenient courts to settle Disputes and accordingly no Party will argue to the contrary.

This Clause 26.2 is for the benefit of the Lender only. As a result, the Lender shall not be prevented from taking proceedings relating to a Dispute in any other courts with jurisdiction.
To the extent allowed by law, the Lender may take concurrent proceedings in any number of jurisdictions.

32

 
 
 
 
 
 
 
 
1.

The Borrower

(a)

A copy of the constitutional documents of the Borrower, including:

SCHEDULE 1
Conditions Precedent to initial utilization

(i)

(ii)

its certification of formation, certified as of a recent date by the relevant authority of the jurisdiction of organization of the Borrower; and

a certificate as to its existence and good standing as of a recent date from the relevant authority of the jurisdiction of organization of the Borrower.

(b)

A copy of a resolution of the member of the Borrower:

(i)

approving the terms of, and the transactions contemplated by, the Finance Documents to which it is a party and resolving that it execute the Finance Documents to which it is
a party;

(ii)

authorising a specified person or persons to execute the Finance Documents to which it is a party on its behalf; and

(iii)

authorising a specified person or persons, on its behalf, to sign and/or despatch all documents and notices to be signed and/or despatched by it under or in connection with the
Finance Documents to which it is a party.

(c)

(d)

A specimen of the signature of each person authorised by the resolution referred to in paragraph (b) above.

A certificate of an authorised signatory of the Borrower certifying that each copy document relating to it specified in this Paragraph 1 of Schedule 1 is correct, complete and in full
force and effect as at a date no earlier than 3 Business Days prior to the date of this Agreement.

2.

Finance Documents

(a)

(b)

This Agreement duly executed by the Borrower.

The agreed form of the Assignment Agreement, which shall include a completed and final Schedule 1 (as defined in the Assignment Agreement).

3.

Other documents and evidence

(a)

A copy of the executed Initial Qoros Loan Agreement and evidence that the proceeds of the initial drawdown under this Agreement will be applied to fund the first drawdown under the
Initial Qoros Loan Agreement.

33

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(b)

(c)

(d)

(e)

A copy of the executed Initial Chery Loan Agreement and evidence or confirmation that an amount equal to the first drawdown amount under this Agreement will be made available
and paid to Qoros under the Initial Chery Loan Agreement simultaneously with, or prior to, the first drawdown under this Agreement.

A copy of the executed Initial LLC Agreement.

A copy of the executed Undertaking Agreement, dated as of the date hereof, between Qoros, the Borrower, Kenon, Wuhu Chery Automobile Investment Co. Ltd., Chery Automobiles
Limited and the Lender.

The Borrower having obtained all required governmental, creditor and partner consents, including appropriate foreign debt quota or other necessary regulatory approvals in connection
with the Finance Documents, the Initial Qoros Loan Agreement and the Qoros Security Agreement.

34

 
 
 
SCHEDULE 2 
Form of Utilisation Request

To:

ANSONIA HOLDINGS SINGAPORE B.V. 
as Lender

From: QUANTUM (2007) LLC 

as Borrower

Date:

Dear Sirs,

1.

2.

I refer to the Agreement. This is a Utilisation Request. Words and expressions used in this Request shall have the same meaning as are given to them in the Agreement.

Loan Agreement dated _____ 2016 ( the “Agreement”)

I wish to borrow the Loan on the following terms:

(a)

(b)

(b)

Utilisation Date: [●]

Facility: [A] / [B] / [C]

Amount: USD [●]

3.

The proceeds of this Loan should be credited to [ account ].

Yours faithfully

Manager of
QUANTUM (2007) LLC

35

 
 
          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

By

Name:
Title:

SIGNATURES

36

 
 
 
 
 
 
 
 
 
 
 
 
 
QUANTUM (2007) LLC
as Borrower

By

Name:
Title:

37

 
 
 
 
 
 
 
 
 
 
 
 
 
To:

ANSONIA HOLDINGS SINGAPORE B.V. , incorporated under the laws of the Netherlands (Besloten vennootschap met beperkte aansprakelijkheid) and having its registered office at 1
Temasek Avenue #37-02B, Millenia Tower, Singapore 039192 (the “ Lender ”)

From: QUANTUM (2007) LLC , a Delaware limited liability company with file number 4300667 and having its registered office at 16192 Coastal Highway, Lewes, Delaware 19958, United States of

America (as “ Borrower ”)

Dated:       19 January   2017

Dear Sirs

AMENDMENT AND CONSENT LETTER

1.

1.1

1.2

INTRODUCTION

We refer to the loan agreement dated 22 April 2016 between the Borrower as borrower and the Lender as lender, as amended from time to time including as amended by an amendment letter
dated 27 June 2016 and as amended and restated by an amendment and restatement deed dated 2 September 2016 ( the “ Loan Agreement ” ). The Borrower and Lender have agreed to amend
the Loan Agreement as set out in this letter. This letter is supplemental to the Loan Agreement.

Capitalised terms defined in the Loan Agreement have, unless expressly defined in this letter, the same meaning in this letter. The provisions of Clauses 1.2 ( Construction ) and 1.3 ( Third
party rights ) of the Loan Agreement apply to this letter as though they were set out in full in this letter except that references to the Loan Agreement are to be construed as references to this
letter.

2.

CONSENT

We  hereby  request  that  for  the  purposes  of  the  Loan  Agreement,  the  Lender  consents  to  and,  upon  the  date  that  this  letter  is  agreed  and  accepted  by  the  Lender  (by  delivery  of  its
countersignature hereto to the Borrower), the Lender hereby consents to:

(a)

(b)

the Borrower and Qoros entering into and executing the amendment agreements in substantially the form set out in Annexure A (the “ Qoros Loan Amendment Agreements ”); and

the amendments to the Qoros Loan Agreements as set out in the Qoros Loan Amendment Agreements,

and agrees that such consent shall constitute prior written consent as contemplated in clauses 12.8 ( Qoros Loan Agreements ) and 13.12 ( Qoros Loan Agreements ) of the Loan Agreement.

 
 
 
 
 
 
 
 
 
 
 
 
3.

AMENDMENTS

The  Borrower  and  Lender  agree  that  the  Loan  Agreement  shall  be  amended,  with  effect  on  and  from  the  date  that  this  letter  is  agreed  and  accepted  by  the  Lender  (by  delivery  of  its
countersignature hereto to the Borrower) (the “ Effective Date ” ), so that the definition of “Termination Date” in Clause 1.1 ( Definitions ) of the Loan Agreement is deleted in its entirety and
replaced with the following:

4.

4.1

4.2

4.3

4.4

4.5

4.6

5.

5.1

“ “ Termination Date ” means 20 July 2017. ”.

MISCELLANEOUS

The Lender and the Borrower hereby agree that all references in the Loan Agreement (as amended by this letter) to the terms “Additional August 2016 Qoros Loan Agreement”, “Initial Qoros
Loan Agreement” and “Qoros Loan Agreements” shall be deemed, interpreted and construed for all purposes so as to include the Qoros Loan Amendment Agreements in the form approved and
consented to pursuant to this letter.

The Borrower hereby undertakes to provide to the Lender copies of the duly executed Qoros Loan Amendment Agreements promptly following their execution.

Subject to the terms of this letter, the Loan Agreement will remain in full force and effect and the Loan Agreement and this letter will, from the Effective Date, be read and construed as one
document.

This letter is a Finance Document for the purposes of the Loan Agreement.

The provision of Clauses 19 ( Notices ), 21 ( Partial Invalidity) , 22 ( Remedies and Waivers), 23 ( Amendments and Waivers ) and 26.2 ( Jurisdiction ) of the Loan Agreement shall apply to this
letter, as if set out in full and so that references in those provisions to “this Agreement” shall be construed as references to this letter.

This letter may be executed in any number of counterparts and all of those counterparts taken together shall be deemed to constitute one and the same instrument.

GOVERNING LAW

This letter and any non-contractual obligations arising out of or in connection with it are governed by, and shall be construed in accordance with, English law.

2

 
 
 
 
 
 
 
 
 
 
 
Please confirm your agreement to the terms of this letter and the terms of the Loan Agreement (as amended by this letter) by signing, dating and returning a copy of this letter.

Yours faithfully,

QUANTUM (2007) LLC
as Borrower

By

N ame: R obert L. R osen
T itle:    M anager

Agreed and accepted this _ day of  ______ 2017

ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

By

Name:
Title:

3

 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Please confirm your agreement to the terms of this letter and the terms of the Loan Agreement (as amended by this letter) by signing, dating and returning a copy of this letter.

Yours faithfully,

QUANTUM (2007) LLC
as Borrower

By

Name:
Title:  

Agreed and accepted this 19th day of January 2017

ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

By

Name: CYRIL DUCAU
Title: CEO

3

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
ANNEXURE A – FORM OF QOROS LOAN AMENDMENT AGREEMENTS

4

Renewal Loan Agreement

This renewal loan agreement (hereinafter the “ Renewal Agreement ” ) is entered into on ___________ January 2017 by and between following parties:

Qoros Automotive Co., Ltd., as the borrower (the “ Borrower ” ), a limited liability company incorporated and duly existing under the PRC law, with the address of No. 1, Tongda Road, Economic
Technology Development Zone, Changshu City, Jiangsu Province, People’s Republic of China ( “ PRC ” ), and

Quantum (2007) LLC as the lender (the “ Lender ” ), a company incorporated under the laws of the State of Delaware, the United States of America, with its legal address at 16192 Coastal Highway,
Lewes, Delaware 19958, USA.

(The Lender and the Borrower hereinafter also referred to in singular as a “ Party ” and together as “the Parties ” .)

WHEREAS the Lender holds 50% of the equity interest in the Borrower and Wuhu Chery Automobile Investment Co. Ltd. ( “ Wuhu Chery ” ) holds another 50% equity interest in the Borrower.

WHEREAS the Lender has provided a shareholder loan to the Borrower according to the terms and conditions of a loan agreement dated 14 April 2016 (the “ Original Quantum Loan Agreement ” ),
based on which the Lender agreed to make available to the Borrower a RMB shareholder loan facility in an aggregate principal amount of RMB 300 million (RMB 300,000,000) and the Borrower shall
repay all the Loans thereunder in full together with interest accrued at lump sum on the Repayment Date.

WHEREAS the utilization  of Quantum Facility A and Quantum Facility  B under the Original Quantum Loan Agreement  were registered with the locally competent  State Administration  of Foreign
Exchange ( “ SAFE ” ) respectively on 18 April 2016 and 23 June 2016.

WHEREAS  Wuhu  Chery  under  two  separate  loan  arrangements  provided  two  loans  (with  the  amount  of  each  such  loan  equivalent  to  RMB  150,000,000)  to  the  Borrower,  with  such  comparable
conditions with the Original Quantum Loan Agreement in terms of interest, purpose of loan, term of loan, debt-for-equity swap, penalty and liability provisions, etc. in each such loan agreement (such
loan agreements hereinafter collectively referred to as “ Original Wuhu Chery Loan Agreements ” ).

WHEREAS the Parties now have agreed to extend the Original Term (as defined below) of the Original Quantum Loan Agreement and therefore agree as follows:

1. Terms and expressions defined in the Original Quantum Loan Agreement shall, unless otherwise defined in this Renewal Agreement, bear the same meaning when used in this Renewal Agreement

and in addition:

“ Original Termination Date ” means the date falling 9 months from the first utilization date of Ansonia Facility.

“  Original  Term  ”  means  the  term  commencing  from  first  Utilization  Date  under  the  Original  Quantum  Loan  Agreement  and  terminating  on  the  fifth  Business  Day  preceding  the  Original
Termination Date thereof.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
2. Subject to the terms of this Renewal Agreement, the Parties herewith agree to extend the Original Termination Date to the date of 20 July 2017, and the definition of Termination Date as provided in

Article 1 of the Original Quantum Loan Agreement shall be replaced as follows:

““ Termination Date ” means 20 July 2017.”

3. Subject to the terms of this Renewal Agreement, the Parties herewith agree to (a) extend the Original Term of the Original Quantum Loan Agreement to 13 July 2017 (the “ Renewed Term ” ), and

(b) postpone the Repayment Date to the last day of the Renewed Term, i.e., 13 July 2017.

4. As conditions precedent for the Lender to extend the Original Term and to postpone the Repayment Date, Wuhu Chery must extend the term of its loan to the Borrower and postpone the Repayment

Date under the Original Wuhu Chery Loan Agreements for the same duration and to the same date as provided in the above clause 3 hereunder.

5. Subject to the terms of this Renewal Agreement, the Parties herewith agree to add Article 1.6 of the Original Quantum Loan Agreement as follows:

“1.6

The Borrower herewith undertakes:

(a)          only to amend, repay and/or convert or agree to amend, repay and/or convert any of the Original Wuhu Chery Loan Agreements subject to a prior written notification by the Borrower to the
Lender and written consent by the Lender to such amendment, repayment and/or conversion (as the case may be);

(b)          to conduct the performance of the Original Wuhu Chery Loan Agreements (including any renewals and/or amendments thereof) at all times in a fully equal manner with this Renewal Agreement
(including any renewals and/or amendments thereof), including but not limited to repayment of any amounts of the principal and accrued interest under the Original Wuhu Chery Loan Agreements and
this Renewal Agreement in equal share and at the same time; and

(c)          to renew the Original Wuhu Chery Loan Agreements concurrently with and on equal terms (including but not limited to an equal extension term and postponement of interest) with any renewal
agreements of this Agreement.”

6. All other provisions of the Original Quantum Loan Agreement not amended by this Renewal Agreement shall remain in full force and effect and as applicable and shall apply mutatis mutandis to

this Renewal Agreement.

7. This Renewal Agreement shall come into force upon execution by the legal/authorized representatives of the Parties hereto. SAFE registration of this Renewal Agreement must be carried out within

15 days after the execution of the Renewal Agreement by both Parties.

8. This Renewal Agreement (and for avoidance of doubt also the Original Quantum Loan Agreement) shall automatically terminate upon either (a) the principal amount of the Loans or other payable
amounts  hereunder  (including  but  not  limited  to  late  payment  penalty  interest)  have  been  (re)paid  to  the  Lender  in  full  or  (b)  upon  the  Loan  hereunder  having  been  converted  to  equity  (the  “
Conversion ” ) in  the  Borrower  in  accordance  with  any  agreement  between  the  Borrower  and  Lender  on  such  Conversion  after  execution  of  this  Renewal  Agreement,  whichever  ((a)  or  (b))  is
earlier.

9. This Renewal Agreement shall be signed in three original sets and in English language only. In case any Chinese transcript is made hereof for sake of registration with SAFE, the English version

shall be the only binding version. Each of the Parties shall hold one original set and one original set shall be for SAFE registration purposes.

 
 
 
 
 
 
 
 
 
 
 
 
 
Borrower: QOROS AUTOMOTIVE CO., LTD.

Authorized Signatory: ____________________________

Company Seal

Lender: QUANTUM (2007) LLC

Authorized Signatory: ___________________________________
                                           Robert Rosen

 
 
 
 
 
This renewal loan agreement (hereinafter the “ Renewal Agreement ” ) is entered into on _________ January 2017 by and between following parties:

Renewal Loan Agreement 

Qoros Automotive Co., Ltd., as the borrower (the “ Borrower ” ), a limited liability company incorporated and duly existing under the PRC law, with the address of No. 1, Tongda Road, Economic
Technology Development Zone, Changshu City, Jiangsu Province, People’s Republic of China (“ PRC ”), and 

Quantum (2007) LLC as the lender (the “ Lender ” ), a company incorporated under the laws of the State of Delaware, the United States of America, with its legal address at 16192 Coastal Highway,
Lewes, Delaware 19958, USA.

(The Lender and the Borrower hereinafter also referred to in singular as a “ Party ” and together as “the Parties ” .)

WHEREAS the Lender holds 50% of the equity interest in the Borrower and Wuhu Chery Automobile Investment Co. Ltd. ( “ Wuhu Chery ” ) holds another 50% equity interest in the Borrower.

WHEREAS the Lender has provided a shareholder loan to the Borrower according to the terms and conditions of a loan agreement dated 2 September 2016 (the “ Original Quantum Loan Agreement
” ), based on which the Lender agreed to make available to the Borrower a RMB shareholder loan facility in an aggregate principal amount of RMB 150 million (RMB 150,000,000) and the Borrower
shall repay all the Loans thereunder in full together with interest accrued at lump sum on the Repayment Date.

WHEREAS the Original Quantum Loan Agreement was registered with the locally competent State Administration of Foreign Exchange (“ SAFE ”) on 2 September 2016.

WHEREAS Wuhu Chery under a separate loan arrangement provided a loan to the Borrower, with such comparable conditions with the Original Quantum Loan Agreement in terms of loan amount,
interest, purpose of loan, term of loan, debt-for-equity swap, penalty and liability provisions, etc. (such loan agreement hereinafter referred to as “ Original Wuhu Chery Loan Agreement ” ).

WHEREAS the Parties now have agreed to extend the Original Term (as defined below) of the Original Quantum Loan Agreement and therefore agree as follows:

1. Terms and expressions defined in the Original Quantum Loan Agreement shall, unless otherwise defined  in this Renewal Agreement,  bear the same meaning when used  in this Renewal Agreement

and in addition:

“ Original Termination Date ” means 25 January 2017.

“ Original Term ” means the term commencing from first Utilization Date under the Original Quantum Loan Agreement and terminating on the fifth Business Day preceding the date of the Original
Termination Date.

2. Subject to the terms of this Renewal Agreement, the Parties herewith agree to extend the Original Termination Date to the date of 20 July 2017, and the definition of Termination Date as provided in

Article 1 of the Original Quantum Loan Agreement shall be replaced as follows:

““ Termination Date ” means 20 July 2017.”

 
 
 
 
 
 
 
 
 
 
 
 
 
 
3. Subject to the terms of this Renewal Agreement, the Parties herewith agree to (a) extend the Original Term of the Original Quantum Loan Agreement to 13 July 2017 (the “ Renewed Term ”), and

(b) postpone the Repayment Date to the last day of the Renewed Term, i.e., 13 July 2017.

4. As conditions precedent for the Lender to extend the Original Term and to postpone the Repayment Date, Wuhu Chery must extend the term of its loan to the Borrower and postpone the Repayment

Date under the Original Wuhu Chery Loan Agreement for the same duration and to the same date as provided in the above clause 3 hereunder.

5. Subject to the terms of this Renewal Agreement, the Parties herewith agree to add Article 1.6 of the Original Quantum Loan Agreement as follows:

“1.6      The Borrower herewith undertakes:

(a)            only to amend, repay and/or convert or agree to amend, repay and/or convert the Wuhu Chery Loan Agreement subject to a prior written notification by the Borrower to the Lender and
written consent by the Lender to such amendment, repayment and/or conversion (as the case may be);

(b)                       to  conduct  the  performance  of  the  Original  Wuhu  Chery  Loan  Agreement  (including  any  renewals  and/or  amendments  thereof)  at  all  times  in  a  fully  equal  manner  with  this  Renewal
Agreement  (including  any  renewals  and/or  amendments  thereof),  including  but  not  limited  to  repayment  of  any  amounts  of  the  principal  and  accrued  interest  under  the  Original  Wuhu  Chery  Loan
Agreement and this Renewal Agreement in equal share and at the same time; and

(c)            to renew the Original Wuhu Chery Loan Agreement concurrently with and on equal terms (including but not limited to an equal extension term and postponement of interest) with any renewal
agreements of this Agreement.”

6. All other provisions of the Original Quantum Loan Agreement not amended by this Renewal Agreement shall remain in full force and effect and as applicable and shall apply mutatis mutandis to

this Renewal Agreement.

7. This   Renewal  Agreement  shall  come  into  force  upon  execution  by the  legal/authorized representatives of the Parties hereto. SAFE registration of this Renewal Agreement must be carried out

within 15 days after the execution of the Renewal Agreement by both Parties.

8. This Renewal Agreement (and for avoidance of doubt also the Original Quantum Loan Agreement) shall automatically terminate upon either (a) the principal amount of the Loans or other payable
amounts  hereunder  (including  but  not  limited  to  late  payment  penalty  interest)  have  been  (re)paid  to  the  Lender  in  full  or  (b)  upon  the  Loan  hereunder  having  been  converted  to  equity  (the  “
Conversion ”) in the Borrower in accordance with any agreement between the Borrower and Lender on such Conversion after execution of this Renewal Agreement, whichever ((a) or (b)) is earlier.

9. This Renewal Agreement shall be signed in three original sets and in English language only. In case any Chinese transcript is made hereof for sake of registration with SAFE, the English version

shall be the only binding version. Each of the Parties shall hold one original set and one original set shall be for SAFE registration purposes.

 
 
 
 
Borrower: QOROS AUTOMOTIVE CO., LTD.

Authorized Signatory:

Company Seal

Lender: QUANTUM (2007) LLC

Authorized Signatory:

Robert Rosen

 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 4.19

DATED 2   SEPTEMBER 2016

ADDITIONAL UNDERTAKING AGREEMENT

Skadden, Arps, Slate, Meagher & Flom (UK) LLP
40 Bank Street
Canary Wharf
London E14 5DS

 
 
 
CONTENTS

CLAUSE

1.

2.

3.

4.

5.

6.

7.

8.

INTERPRETATION

UNDERTAKINGS

FURTHER ASSURANCE

PARTIAL INVALIDITY

CONSENT OF THIRD PARTIES

COUNTERPARTS

GOVERNING LAW

DISPUTE RESOLUTION

ANNEXURE A

ANNEXURE B

ANNEXURE C

SIGNATURES

PAGE

4

5

8

8

8

8

8

9

10

11

12

13

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
THIS ADDITIONAL UNDERTAKING AGREEMENT (the “ Agreement ”) is made on 2 September 2016

BETWEEN: 

(1)

(2)

(3)

(4)

(5)

(6)

QOROS AUTOMOTIVE CO., LTD. , a sino-foreign joint equity enterprise established on 24  December 2007 in the People’s Republic of China with address of No.1, Tongda Road,
Economic Technology Development Zone, Changshu City, Jiangsu Province, People’s Republic of China (“ Qoros ”);

QUANTUM (2007) LLC , a Delaware limited liability company (file no. 4300667) whose registered office is at 16192 Coastal Highway, Lewes, Delaware 19958, United States of America (“
LLC ”);

KENON  HOLDINGS  LTD.  ,  a  Singapore  company  with  shares  listed  on  the  Tel  Aviv  Stock  Exchange  and  New  York  Stock  Exchange  (company  registration  no.  201406588W)  whose
registered office is at 1 Temasek Avenue #36-01, Millenia Tower, Singapore 039192 (“ Kenon ”);

WUHU CHERY AUTOMOBILE INVESTMENT CO., LTD , a limited liability company organized and existing under the laws of the People’s Republic of China with its legal address at 8
Chengchun Road, Wuhu Economic and Technological Development Area, Anhui Province, People’s Republic of China (“ Wuhu Chery ”);

CHERY AUTOMOBILES LIMITED , a company limited by shares organized and existing under the laws of the People’s Republic of China with its legal address at 8 Chengchun Road,
Wuhu Economic and Technological Development Area, Anhui Province, People’s Republic of China (“ Chery ”); and

ANSONIA HOLDINGS SINGAPORE B.V. , incorporated under the laws of the Netherlands (Besloten vennootschap met beperkte aansprakelijkheid) and having its registered office at 1
Temasek Avenue #38-01, Millenia Tower, Singapore 039192 (“ Ansonia ”),

(each a Party and together, the Parties ).

RECITALS:

(A)

(B)

(C)

(D)

(E)

By a loan agreement dated 22 April 2016 (as amended by an amendment letter dated 27 June 2016, the “ LLC Loan Agreement ”), Ansonia agreed to provide loans in an aggregate amount up
to USD 50,000,000 to LLC upon the terms set out therein.

By a loan agreement dated 14 April 2016, LLC agreed to make available to Qoros a term loan facility of up to RMB 300,000,000 with the funds it obtained under the LLC Loan Agreement (the
“ LLC-Qoros Loan Agreement ”).

By a loan agreement dated 22 April, 2016, Wuhu Chery agreed to make available to Qoros an entrusted term loan facility of up to RMB 150,000,000 upon the terms set out therein (the “ Initial
Wuhu Chery-Qoros Loan Agreement ”).

By a loan agreement dated 27 June, 2016, Wuhu Chery agreed to make available to Qoros an entrusted term loan facility of up to RMB 150,000,000 upon the terms set out therein (the “ Second
Wuhu Chery-Qoros Loan Agreement ”).

By a Qoros security agreement dated 22 August 2016, Qoros agreed to grant a pledge over its patent right securing the obligations owing by Qoros under the Initial Wuhu Chery-Qoros Loan
Agreement, the Second Wuhu Chery-Qoros Loan Agreement (collectively referred to as the “ Wuhu Chery-Qoros Loan Agreements” ) and the LLC-Qoros Loan Agreement.

3

 
 
 
 
 
 
(F)

(G)

By an undertaking agreement dated 22 April 2016, the Parties made certain arrangements relating to the aforesaid loans provided by the relevant Parties.

Whereas, the relevant Parties now wish to enter into the Amended LLC Loan Agreement, the Additional LLC-Qoros Loan Agreement and the Additional Wuhu Chery-Qoros Loan Agreement
(as respectively defined below) and the Parties agree to enter into, on or about the same date of the Additional Loan Agreements (as defined below), this Additional Undertaking Agreement to
set out further arrangements between the Parties regarding the provision of further loans under the relevant Additional Loan Agreement.

IT IS AGREED as follows:

1.

1.1

INTERPRETATION

Definitions

In this Agreement:

“ Additional LLC-Qoros Loan ” has the meaning described in Clause 2.2(b) ( Additional LLC- Qoros Loan Agreement ) of this Agreement.

“ Additional LLC-Qoros Loan Agreement ” has the meaning described in Clause 2.2(a) ( Additional LLC-Qoros Loan Agreement ) of this Agreement.

“ Additional Loans ” means the Additional LLC-Qoros Loan and the Additional Wuhu Chery- Qoros Loan and “ Additional Loan ” means either of them.

“ Additional  Loan Agreements  ”  means  the  Amended  LLC  Loan  Agreement,  the  Additional  LLC-Qoros  Loan  Agreement  and  the  Additional  Wuhu  Chery-Qoros  Loan  Agreement  and  “
Additional Loan Agreement ” means any one of them.

“ Additional Wuhu Chery-Qoros Loan ” has the meaning described in Clause 2.3(b) ( Additional Wuhu Chery-Qoros Loan Agreement ) of this Agreement

“ Additional Wuhu Chery-Qoros Loan Agreement ” has the meaning described in Clause 2.3(a) ( Additional Wuhu Chery-Qoros Loan Agreement ) of this Agreement.

“ Amended LLC Loan Agreement ” has the meaning described in Clause 2.1(a) ( Amended LLC Loan Agreement ) of this Agreement.

“ Business Day ” means a day (other than a Saturday or Sunday) on which banks are open for general business in London, Singapore and the People’s Republic of China.

“ Class A Interests ” means Class A membership interests in LLC.

“ Class B Interests ” means Class B membership interests in LLC.

“ Interests ” means the Class A Interests and the Class B Interests.

“ SAFE ” means the State Administration of Foreign Exchange of the PRC or its local counterparts.

4

 
 
 
 
1.2

Construction

In this Agreement, unless the context otherwise requires, a reference to:

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

(i)

(j)

a person includes a person, firm, company, corporation, government, state or agency of state or any association , trust partnership (whether or not having a separate legal personality) or
two or more of the foregoing and includes a reference to that person’s successors and permitted assignees or permitted transferees but does not include that person if it has ceased to be
a party under this Agreement;

unless otherwise specified, clauses are references to clauses to this Agreement;

any reference to this Agreement shall include its annexures;

(or to any specified provision of) any agreement is to that agreement (or that provision) as amended from time to time;

a statute, statutory instrument or provision of law is to that statute, statutory instrument or provision of law, as it may be applied, amended or re-enacted from time to time;

the index and the headings in this Agreement are for convenience only and are to be ignored in construing this Agreement;

words imparting the singular include the plural and vice versa;

words “best efforts”, in relation to the performance of any act by a party, shall be construed as the standard of endeavours required under English law;

“ $ , “ USD ” and “ US dollar ” denote the lawful currency of the United States of America; and

“ RMB ” denotes the lawful currency of the People’s Republic of China.

2.

2.1

UNDERTAKINGS

Amended LLC Loan Agreement

(a)

(b)

At the same time as entering into this Agreement, Ansonia and LLC each undertake to the Parties to execute the amendment and restatement agreement between LLC as borrower and
Ansonia as lender in substantially the form annexed to this Agreement as Annexure A (the “ Amended LLC Loan Agreement ”).

On the date of this Agreement, and subject to receipt by Ansonia of a copy of the duly executed Additional Wuhu Chery-Qoros Loan Agreement, Ansonia undertakes to provide LLC
with a loan in an amount of $25,000,000 pursuant to the Amended LLC Loan Agreement.

2.2

Additional LLC-Qoros Loan Agreement

(a)

At  the  same  time  as  entering  into  this  Agreement,  LLC  and  Qoros  each  undertake  to  the  Parties  to  execute  the  loan  agreement  between  LLC  as  lender  and  Qoros  as  Borrower  in
substantially the form annexed to this Agreement as Annexure B (the “ Additional LLC-Qoros Loan Agreement ”).

5

 
 
 
(b)

On a date falling not later than 5 Business Days after the execution of the Amended LLC Loan Agreement, the Additional Wuhu Chery-Qoros Loan Agreement and the Additional
LLC-Qoros Loan Agreement (the “ Additional LLC-Qoros Loan Advance Date ”), LLC undertakes to provide Qoros with a loan in an amount of RMB 150,000,000 pursuant to the
Additional LLC-Qoros Loan Agreement (the “ Additional LLC-Qoros Loan ”).

2.3

Additional Wuhu Chery-Qoros Loan Agreement

(a)

(b)

At the same time as entering into this Agreement, Wuhu Chery and Qoros each undertake to the Parties to execute the loan agreement between Qoros as borrower, the Bank of China
Limited, Changshu Sub-Branch ( 
 ) as entrusted bank and Wuhu Chery as lender in substantially the form annexed to this Agreement as Annexure C (the
“ Additional Wuhu Chery-Qoros Loan Agreement ”).

On a date falling not later than 5 Business Days after the execution of the Amended LLC Loan Agreement, the Additional Wuhu Chery-Qoros Loan Agreement and the Additional
LLC-Qoros Loan Agreement (the “ Additional Wuhu Chery-Qoros Loan Advance Date ”), Wuhu Chery undertakes to provide Qoros with a loan in an amount of RMB 150,000,000
pursuant to the Additional Wuhu Chery-Qoros Loan Agreement (the “ Additional Wuhu Chery-Qoros Loan ”).

2.4

Conversion of Class B Interests into Class A Interests

(a)

(b)

(c)

In connection with the conversion of the loans provided by Ansonia pursuant to the Amended LLC Loan Agreement into Class A Interests pursuant to the terms of the Amended LLC
Loan Agreement (the “ LLC Conversion ”), and to the extent that the LLC Conversion will result in an issuance of Class A Interests to Ansonia in excess of the number of Interests
which LLC may issue to a third-party without violating the terms of the existing joint venture agreement of Qoros (the “Joint Venture Agreement” ), LLC undertakes that it shall
convert the maximum number of Class B Interests into Class A Interests permitted by the Joint Venture Agreement and shall use its best efforts (including, but not limited to, assisting
with obtaining any required governmental or regulatory approvals, but, for the avoidance of doubt, such efforts shall exclude any requirement to make a repayment or prepayment of
any existing indebtedness of Qoros) to make appropriate amendments to the Joint Venture Agreement, such that, following such amendments, LLC may convert Ansonia’s   remaining
Class B Interests into Class A Interests in compliance with LLC’s   contractual obligations under the Joint Venture Agreement.

For the avoidance of doubt, the LLC Conversion shall be deemed complete only upon (i) the conversion of each of the Class B Interests held by Ansonia into Class A Interests and the
cancellation of each of the Class B Interests or (ii) the conversion of certain of the Class B Interests held by Ansonia into Class A Interests and the cancellation of each of the Class B
Interests, in each case with such conversion and cancellation to be reflected in an adjustment to Schedule A of the Fourth Amended and Restated Limited Liability Company Operating
Agreement, dated on or about the date of this Agreement, by and between Robert Rosen, as manager, and each member party thereto.

Notwithstanding the forgoing, to the extent LLC is not able to convert all of Ansonia’s Class B Interests into Class A Interests pursuant to an LLC Conversion, LLC, Chery, Wuhu
Chery and Qoros undertake to enter into good faith negotiations with Ansonia to take necessary steps to put Ansonia in the same economic position it would have been in as if all of its
Class B Interests were converted into Class A Interests.

6

 
 
 
 
 
 
 
 
 
 
2.5

Conversion of Class A Interests into direct ownership of Qoros

(a)

Following the LLC Conversion and until the third anniversary of the LLC Conversion, Ansonia may, at its discretion, request to LLC in writing that it wishes to convert / exchange its
Class A Interests into a direct holding by it of an equity interest in Qoros (the “Company Conversion ” ) based on the then value of the indirect beneficial ownership in Qoros of such
Class A Interests.

(b)

If Ansonia requests a Company Conversion pursuant to paragraph (a) above:

(i)

(ii)

(iii)

(iv)

LLC shall notify each other party to this Agreement of Ansonia’s request;

LLC undertakes that it will use its best efforts (including, but not limited to, assisting with obtaining any required governmental or regulatory approvals, but, for the avoidance
of doubt, such efforts shall exclude any requirement to make a repayment or prepayment of any existing indebtedness of Qoros) to take any and all steps required to effect the
Company Conversion based on the then value of the indirect beneficial ownership in Qoros of such Class A Interests;

each of Kenon, Chery, Wuhu Chery and Qoros undertake to enter into good faith negotiations with respect to the Company Conversion and, following the conclusion of such
negotiations, to enter into such agreements, and to use best efforts to take all other action, as is required by LLC and / or Ansonia to give effect to the Company Conversion;
and

without  prejudice  to  the  generality  of  Clause  2.5(b)(iii),  in  respect  of  a  Company  Conversion,  each  of  Kenon,  Chery  and  Qoros  hereby  undertake  to  enter  into  good  faith
negotiations to make appropriate amendments to the Joint Venture Agreement such that, following the Company Conversion, each of Wuhu Chery, LLC, Ansonia and any
new  third  party  investor  is  a  party  to  such  Joint  Venture  Agreement  and  the  Joint  Venture  Agreement  is  amended  to  reflect  typical  rights  and  protections  for  minority
investors, including, but not limited to, relating to anti-dilution, material corporate actions and board representation.

(c)

The undertakings and obligations of Chery and Wuhu Chery in sub-paragraphs (b)(iii) and (b)(iv) above (and compliance thereto) are subject to Chery and Wuhu Chery obtaining the
required:

(i)

(ii)

internal corporate and board approval; and

shareholder approval,

and Chery and Wuhu Chery agree to use best efforts to obtain such approvals at the relevant and appropriate time.

(d)

Notwithstanding anything contrary hereunder, the Company Conversion is subject to consent by Chery.

2.6

Undertakings

(a)

Each of Kenon, LLC and Wuhu Chery agrees with and undertakes that it shall ensure that the Additional LLC-Qoros Loan Advance Date and the Additional Wuhu Chery-Qoros Loan
Advance  Date  shall  occur  on  the  same  date  regardless  of  whether  any  condition  in  relation  to  the  provision  of  such  Additional  Loan  described  in  the  relevant  Additional  Loan
Agreement has not been fulfilled.

7

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(b)

Each of Kenon and LLC agrees with and undertakes to each of Wuhu Chery and Qoros that it shall use its best efforts to promptly obtain the registration of the Additional LLC-Qoros
Loan  with  SAFE  as  required  to  ensure  that  the  Additional  LLC-Qoros  Loan  can  be  advanced  on  the  date  in  accordance  with  Clauses  2.2(b)  and  2.6  (a).  A  failure  to  obtain  such
registration shall not be considered a breach by Kenon or LLC (as applicable) of their obligations under this clause 2.6(b) if such failure is not caused by or attributable to the actions
of, or failure to act by, Kenon or LLC (as applicable). In the event of such failure, Wuhu Chery shall be automatically discharged from the obligations to provide the Additional Wuhu
Chery-Qoros Loan in accordance with Clause 2.3(b) and if such obligation has been performed, Qoros shall be obliged to repay the amount of the Additional Wuhu Chery-Qoros Loan
to Wuhu Chery immediately.

(c)

Each Party (other than Ansonia) shall, within three (3) Business Days of demand, indemnify the other Party (other than Ansonia) (the “ Indemnified Party ”) against any cost, loss or
liability incurred by the Indemnified Party as a result of a breach of any obligations under this Clause 2 by such Party.

3.

FURTHER   ASSURANCE

Each  party  to  this  Agreement  shall,  and  shall  use  reasonable  endeavours  to  procure  that  any  necessary  third  party  shall,  at  its  own  expense,  do  and  execute,  or  arrange  for  the  doing  and
executing of, each necessary act, document and thing reasonably within its power and as may be reasonably requested of it to implement this Agreement and the transactions contemplated by
this Agreement.

4.

PARTIAL INVALIDITY

If, at any time, any provision of this Agreement is or becomes illegal, invalid or unenforceable in any respect under the law of any jurisdiction, neither the legality, validity or enforceability of
any other provision of this Agreement nor the legality, validity or enforceability under the law of any other jurisdiction shall in any way be affected or impaired.

5.

CONSENT OF THIRD PARTIES

Notwithstanding  any  term  of  this  Agreement,  no  consent  of  any  third  party  is  required  for  any  amendment  (including  any  release  or  compromise  of  any  liability)  or  termination  of  this
Agreement.

6.

7.

COUNTERPARTS

This Agreement may be executed in any number of counterparts, all of which taken together shall constitute one and the same instrument.

GOVERNING   LAW

This Agreement and any dispute or claim arising out of or in connection with it or its subject matter shall be governed by, and construed in accordance with, the laws of the People ’ s Republic
of China.

8

 
 
 
 
 
 
 
 
 
 
 
8.

DISPUTE   RESOLUTION

Any dispute in connection with this Agreement shall be resolved through friendly negotiation between the Parties. If the dispute is not resolved through negotiation within sixty (60) calendar
days  after  one  Party has  served  a written  notice  on the  other  Parties  requesting  the  commencement  of negotiation,  then the  Parties  shall  refer  and submit  the  dispute  for  final  resolution  by
arbitration  to  the  Hong  Kong  International  Arbitration  Center  (HKIAC)  in  accordance  with  the  Arbitration  Rules  of  the  United  Nations  Commission  on  International  Trade  Law  (the  “
UNCITRAL Arbitration Rules ”)   as   at   present in   force   save as   the   same may be amended by this Agreement and the UNCITRAL Arbitration Rules shall be construed accordingly.
The  place  of  arbitration  shall  be  Hong Kong. The  arbitration  shall  be  settled  by three  (3)  arbitrators.  Ansonia,  Kenon and  LLC as  one  side,  and  Chery,  Wuhu  Chery  as  the  other  side  shall
separately appoint one arbitrator within the time stipulated in the UNCITRAL Arbitration Rules, failing which the appointment shall be made by HKIAC. The third arbitrator, who will act as
the presiding arbitrator, shall be appointed by the HKIAC. The appointing authority shall be the HKIAC. The language of the arbitration proceedings shall be English, provided that either Party
may introduce evidence or testimony in languages other than English. The award of the arbitration tribunal will be final and binding on each of the Parties and may be enforced, if necessary, in
any court of competent jurisdiction. The costs of arbitration   including   attorneys’   fees   shall   be   borne   by   the   losing   Party   unless   otherwise decided in the arbitral award. In any
arbitration  proceeding  or legal proceeding  to enforce  an arbitral  award, in any other legal action  between the Parties relating  to this Agreement,  each Party waives the defense of sovereign
immunity and any other defense solely based upon the fact or allegation that it is a political subdivision, agency or instrumentality of a sovereign state.

IN WITNESS of which the Parties have executed and delivered this document on the date first written above.

9

 
 
ANNEXURE A

Form of Amended LLC Loan Agreement

10

 
DATED_______ 2016

AMENDMENT AND RESTATEMENT AGREEMENT
RELATING TO THE LOAN AGREEMENT
DATED 22 APRIL 2016

between

QUANTUM (2007) LLC

as Borrower

and

ANSONIA HOLDINGS SINGAPORE B.V.

as Lender

Skadden, Arps, Slate, Meagher & Flom (UK) LLP 
40 Bank Street
Canary Wharf
London E14 5DS

 
 
 
 
 
 
 
 
THIS AGREEMENT is dated ___________ 2016 between:

(1)

(2)

QUANTUM (2007) LLC, a Delaware limited liability company with file number 4300667 and having its registered office at 16192 Coastal Highway, Lewes, Delaware 19958, United States of
America (the “Borrower”); and

ANSONIA HOLDINGS  SINGAPORE  B.V.,  incorporated  under the laws  of the Netherlands  (Besloten vennootschap met beperkte aansprakelijkheid) and  having  its  registered  office  at  1
Temasek Avenue #38-01, Millenia Tower, Singapore 039192 (the “Lender”),

(each a “Party” and together the “Parties”).

BACKGROUND:

This Agreement is supplemental to and amends and restates the loan agreement dated 22 April 2016 between the Borrower and the Lender, as amended by an amendment letter dated 27 June 2016 (the
“Existing Loan Agreement”).

NOW THIS AGREEMENT WITNESSES as follows:

1.         INTERPRETATION

1.1

Definitions

In this Agreement:

“Effective Date” means the date of this Agreement.

“Loan Agreement” means the Existing Loan Agreement as amended and restated by this Agreement.

1.2

Construction and Third Party Rights

The provisions of clauses 1.2 (Construction) and 1.3 (Third party rights) of the Existing Loan Agreement apply to this Agreement as though they were set out in full in this Agreement except
that references to the Existing Loan Agreement are to be construed as references to this Agreement.

1

 
 
 
 
 
 
 
 
 
 
 
 
1.3       Definitions

Unless otherwise defined in this Agreement, words and expressions defined in the Existing Loan Agreement shall have the same meanings when used in this Agreement.

2.              AMENDMENT AND RESTATEMENT

With effect on and from the Effective Date:

(a)

(b)

(c)

the Existing Loan Agreement will be amended and restated so that it shall be replaced in its entirety and be read and construed for all purposes as set out in Annexure A (The Loan
Agreement) to this Agreement;

any reference to the Existing Loan Agreement in the Finance Documents shall be read and construed as references to the Loan Agreement; and

each Party unconditionally acknowledges and agrees to be bound by the Loan Agreement and to perform its obligations under the Loan Agreement.

3.              MISCELLANEOUS

(a)

(b)

(c)

This Agreement is a Finance Document.

The provision of clauses 19 (Notices), 21 (Partial Invalidity), 22 (Remedies and Waivers), 23 (Amendments and Waivers) and 26.2 (Jurisdiction) of the Existing Loan Agreement shall
apply to this letter, as if set out in full and so that references in those provisions to “this Agreement” shall be construed as references to this letter.

This letter may be executed in any number of counterparts and all of those counterparts taken together shall be deemed to constitute one and the same instrument.

4.              GOVERNING LAW

This Agreement and any non-contractual obligations arising out of or in connection with it are governed by, and shall be construed in accordance with, English law.

2

 
 
 
 
 
 
 
ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

By

Name:
Title:

SIGNATURES

3

 
 
          
 
 
 
 
 
 
QUANTUM (2007) LLC
as Borrower

By

Name:
Title:

4

 
          
 
 
 
 
 
 
ANNEXURE A
THE LOAN AGREEMENT

5

DATED 22 April 2016 
as amended by an amendment letter dated 27 June 2016 and as amended and restated by an amendment and restatement deed dated __ August 2016

LOAN AGREEMENT

between

QUANTUM (2007) LLC

as Borrower

and

ANSONIA HOLDINGS SINGAPORE B.V.

as Lender

Skadden, Arps, Slate, Meagher & Flom (UK) LLP 
40 Bank Street 
Canary Wharf 
London E14 5DS

CONTENTS

Clause

Definitions and Interpretation
The Facility
Purpose
Drawdown
Repayment and mandatory prepayment
Interest
Conversion
Tax and other deductions
Costs and Expenses
Representations and warranties
Information Undertakings
General Undertakings
Events of Default
Trigger Events
Secondary Sale
Limited Recourse
Administration
Assignment and Transfer
Notices
Calculations and Certificates
Partial Invalidity
Remedies and Waivers
Amendments and Waivers
Counterparts
Entire Agreement
Governing Law and Enforcement

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
SCHEDULE 1 Conditions Precedent to initial utilization
SCHEDULE 2 Form of Utilisation Request

Page

1
7
8
8
10
12
12
18
19
19
20
20
23
27
28
29
29
30
30
31
31
31
31
31
31
32
33
35

 
 
 
THIS AGREEMENT is dated 22 April 2016 as amended by an amendment letter dated 27 June 2016 and as amended and restated by an amendment and restatement deed dated __ August 2016 and
made between:

(1)

(2)

QUANTUM (2007) LLC , a Delaware limited liability company with file number 4300667 and having its registered office at 16192 Coastal Highway, Lewes, Delaware 19958, United States of
America (the “ Borrower ”); and

ANSONIA HOLDINGS SINGAPORE B.V. , incorporated under the laws of the Netherlands (Besloten vennootschap met beperkte aansprakelijkheid) and having its registered office at 1
Temasek Avenue #38-01, Millenia Tower, Singapore 039192 (the “ Lender ”).

BACKGROUND:

(A)

(B)

(C)

The  Lender  intends  to  make  available  to  the  Borrower  the  Loans  (as  defined  below)  in  order  to  enable  the  Borrower  to  make  corresponding  loans  to  Qoros  pursuant  to  the  Qoros  Loan
Agreements and on the condition that Wuhu Chery Automobile Investment Co. Ltd. make corresponding loans to Qoros, such that the total amount of loans made available to Qoros, subject to
the terms and conditions herein and in the applicable Chery Loan Agreement (defined below), will be up to $150 million.

The Lender intends that the Loans (and corresponding loans to Qoros) will enable Qoros to meet its working capital requirements and enable Qoros to seek additional financing, including a
Qualified Financing.

The  terms  of  this  Agreement  shall  enable  the  Borrower  to  repay  the  Loans  (as  described  herein)  at  par  plus  accrued  interest,  including  upon  any  new  financing  at  Qoros  that  results  in  a
repayment  of  the  corresponding  loan  under  a  Qoros  Loan  Agreement.  In  addition,  upon  any  disposition  by  the  Borrower  of  its  interest  in  Qoros,  the  net  proceeds  will  be  applied  to  repay
amounts outstanding under the Loans (or, if the Loans have been converted into Class A Interests, to redeem such interests).

IT IS AGREED as follows:

1.

1.1

DEFINITIONS AND INTERPRETATION

Definitions

In this Agreement:

“ Additional Chery Loan Agreement ” means each additional term loan facility agreement entered into between Wuhu Chery Automobile Investment Co. Ltd. as lender, the Industrial and
Commercial Bank of China Limited, Changshu Sub-Branch ( 
 ) as entrusted bank and Qoros as borrower with aggregate commitments, in each case, of up
to an amount equal to the RMB equivalent of USD 25,000,000 for the purposes of Qoros’ ordinary course working capital requirements with terms that are the same as those contained in the
Initial Chery Loan Agreement.

“ Additional August 2016 Qoros Loan Agreement ” means the term loan facility agreement entered into between the Borrower as lender and Qoros as borrower for the purposes of Qoros’
ordinary course working capital requirements with aggregate commitments of up to an amount equal to the RMB equivalent of USD [24,000,000] with terms that are substantially the same as
those contained in the Initial Qoros Loan Agreement.

“ Available Commitments ” means, in relation to a Facility, the then undrawn amount of the Commitment relating to that Facility minus, in relation to any proposed Loan under that Facility,
the amount of any other Loan under that Facility that is due and to be made on or before the proposed Utilisation Date.

“ Assignment Agreement ” means the English law governed assignment agreement dated 24 August 2016 granted by the Borrower in favour of the Lender under which the Borrower’s rights
under the Qoros Security Agreement and Qoros Loan Agreements are assigned to the Lender.

“ Business Day ” means a day (other than a Saturday or Sunday) on which banks are open for general business in London, Singapore and Beijing and, in respect of any day on which payment is
to be made under this Agreement, New York City.

“ Chery Loan Agreement ” means:

(a)

(b)

the Initial Chery Loan Agreement; and

each Additional Chery Loan Agreement.

“ Class A Interests ” means Class A membership interests in the Borrower.

“ Class B Interests ” means Class B membership interests in the Borrower.

“ Commitment ” means:

(a)

(b)

(c)

with respect to Facility A, $25,000,000;

with respect to Facility B, $25,000,000; and

with respect to Facility C, $25,000,000.

“ Conversion Date ” means the date on which the Lender’s Class B Interests are converted to Class A Interests pursuant to Clause 7(a).

“ Default ” means an Event of Default or any event or circumstance specified in Clause 13 ( Events of Default ) which would (with the expiry of a grace period or the giving of notice, making
of any determination or the satisfaction of any other condition) be an Event of Default.

“ Event of Default ” means any event or circumstance specified as such in Clause 13 ( Events of Default ).

2

“ EXIM Loan Agreement No. 1 ”  means  the  1,200,000,000  RMB  Equivalent  Syndicated  Loan  Agreement  concerning  the  Project  of  Research  and  Development  of  C  Platform  Derivative
Model of Qoros Automotive Co., Ltd. dated 31 July 2014 between, among others, Qoros Automotive Co., Ltd. as Borrower, Export-Import  Bank of China, as arranger,  and Bank of China
Limited Su Zhou Branch, as agent (as amended and/or restated from time to time).

“ EXIM Loan Agreement No. 2 ” means the loan agreement expected to be entered into between, among others, Qoros Automotive Co., Ltd. as Borrower, and Export-Import Bank of China,
as arranger (as amended and/or restated from time to time) or a similar loan agreement.

“ Exim Pledges ” means:

(a)

(b)

the equity pledge contract dated 31 July 2014 granted by the Borrower in favour of Bank of China Limited Su Zhou Branch, as agent, (as amended and/or restated from time to time,
including the amendments approved as set out in the Changshu Economic and Technological Development Zone Management Committee approval dated 13 July 2015) in respect of a
portion of the Borrower’s equity interests in Qoros, which equity pledge was granted to secure the obligations owing in respect of EXIM Loan Agreement No. 1; and

any other pledge granted by the Borrower in favour of the agent or lenders under the EXIM Loan Agreement No. 2, following the date of this Agreement, in respect of a portion of the
Borrower’s equity interests in Qoros (as amended and / or restated from time to time), which equity pledge will be granted to secure the obligations owing in respect of EXIM Loan
Agreement No. 2.

“ Facility ” means Facility A, Facility B or Facility C, as the case may be.

“ Facility A ” means the term loan facility made available under this Agreement as described in Clause 2.1 ( Facility A ).

“ Facility B ” means the term loan facility made available under this Agreement as described in Clause 2.2 ( Facility B ).

“ Facility B Conversion/Repayment Notice ” has the meaning given to that term Clause 7(a)(ii).

“ Facility C ” means the term loan facility made available under this Agreement as described in Clause 2.3 ( Facility C ).

“ Facility C Conversion/Repayment Notice ” has the meaning given to that term in Clause 7(a)(iii).

“ Facility Conversion Notice ” has the meaning given to that term in Clause 7(d).

“ Facility Conversion/Repayment Notices ” means together:

3

(a)

(b)

the Facility B Conversion/Repayment Notice;

the Facility C Conversion/Repayment Notice,

and “ Facility Conversion/Repayment Notice ” shall mean either one as the context may require.

“ Finance Document ” means this Agreement, the Assignment Agreement and any other document designated as such by the Lender and the Borrower in writing.

“  Financial  Indebtedness  ”  means  any  obligation  to  pay  or  repay  money,  present  or  future,  whether  actual  or  contingent,  sole  or  joint  and  any  guarantee  or  indemnity  of  any  of  those
obligations.

“Further Facility Conversion/Repayment Notice ” has the meaning given to that term in Clause 7(c). “ Initial Chery Loan Agreement ” means the term loan facility agreement dated 22
 Changshu  Sub-Branch  (   
April

 2016  between  Wuhu  Chery  Automobile  Investment

 Bank  of  China  Limited,

 and  Commercial

 the  Industrial

 as  lender,

 Ltd.

 Co.

 ) as entrusted bank and Qoros as borrower, with aggregate commitments of up to an amount equal to the RMB equivalent of USD 24,000,000.

“ Initial LLC Agreement ” means the Second Amended and Restated Limited Liability Company Agreement of the Borrower, dated 22 April 2016, between Robert Rosen, as the manager, and
Kenon Holdings Ltd. and the Lender, as the members, as amended and/or restated from time to time.

“ Initial Qoros Loan Agreement ” means the term loan facility agreement dated 22 April 2016 between the Borrower as lender and Qoros as borrower for the purposes of Qoros’ ordinary
course working capital requirements with aggregate commitments of up to an amount equal to the RMB equivalent of USD 48,000,000.

“ Kenon ” means Kenon Holdings Ltd., a company incorporated under the laws of Singapore.

“ Legal Reservations ” means:

(a)

(b)

the principle that equitable remedies may be granted or refused at the discretion of a court and the limitation of enforcement by laws relating to insolvency, reorganisation and other
laws generally affecting the rights of creditors;

the time barring of claims under relevant legislation, the possibility that an undertaking to assume liability for or indemnity a person against non-payment of stamp duty may be void
and defences of set-off or counterclaim; and

(c)

similar principles, rights and defences under the laws of any applicable jurisdiction.

4

“ LLC Agreement ” means the Fourth Amended and Restated Limited Liability Company Agreement of the Borrower, dated ___ August 2016, between Robert Rosen, as the manager, and
Kenon Holdings Ltd. and the Lender, as the members, as amended and/or restated from time to time.

“ Loan ” means the loan to be made under a Facility or the principal amount outstanding for the time being of such loan.

“ Material Adverse Effect ” means  any event  or circumstance which, taking into account all relevant circumstances, has a material adverse effect on:

(a)

(b)

(c)

the business, assets or financial condition of the Borrower; or

the ability of the Borrower to perform its payment obligations under the Finance Documents; or

the validity, enforceability or effectiveness or priority or ranking of any Finance Document, any Qoros Loan Agreement or the Qoros Security Agreement.

“ Party ” means a party to this Agreement.

“ People's Republic of China ” and “ PRC ” means the People's Republic of China excluding Taiwan, Macau and Hong Kong.

“ Qoros ” means Qoros Automotive Co., Ltd, a company incorporated under the laws of the People's Republic of China.

“ Qoros Default ” means a “Default” as defined in a Qoros Loan Agreement.

“ Qoros Loan Agreements ” means together:

(a)

(b)

the Initial Qoros Loan Agreement; and

the Additional August 2016 Qoros Loan Agreement,

and “ Qoros Loan Agreement ” shall mean either one as the context may require.

“ Qoros Security Agreement ” means the PRC law governed  patent  right  pledge agreement dated 22 August 2016 between Qoros, the Borrower and Wuhu Chery Automobile Investment Co.
Ltd as amended from time to time.

“ Qualified Financing ”  means  a  financing  pursuant  to  which  a  third  party  investor  subscribes  (or,  in  the  case  of  a  financing  by  way  of  instrument  that  is  convertible  into  equity,  will  on
conversion of such instrument subscribe) for an equity interest in Qoros in an aggregate amount of not less than the Qualified Financing Amount excluding the amount of any conversion of
Financial Indebtedness into equity in Qoros undertaken pursuant to the terms of this agreement.

“ Qualified Financing Amount ” has the meaning given to that term in the Initial Qoros Loan Agreement.

5

 
 
 
 
 
 
 
 
“ Security Interest ” means any mortgage, pledge, lien, charge (fixed or floating), assignment, hypothecation, set-off or trust arrangement for the purpose of creating security, reservation of
title or security interest or any other agreement or arrangement having a similar effect.

“ Tax ” means any tax, levy, impost, duty or other charge, deduction or withholding of a similar nature to tax (and any related penalty, cost, charge or interest).

“ Termination Date ” means 25 January 2017.

“ Total Commitment ” means $75,000,000 to the extent not cancelled or reduced by the Lender under this Agreement.

“ Trigger Event ” means any event or circumstance specified as such in Clause 14 ( Trigger Events ).

“ Unpaid Sum ” means any sum due and payable but unpaid by the Borrower under the Finance Documents. 

“ US Bankruptcy Law ” means the United States Bankruptcy Code of 1978 (Title 11 of the United States Code), any other United States federal or state bankruptcy, insolvency or similar law.

“ Utilisation Date ” means the date on which a Loan is to be made or, as the context requires, was made. 

“ Utilisation Request ” means a notice substantially in the form set out in Schedule 2 ( Form of Request ).

1.2

Construction

(a)

Unless a contrary indication appears, any reference in this Agreement to:

(i)

(ii)

(iii)

(iv)

(v)

the “ Borrower ” or the “ Lender ” shall be construed so as to include its successors in title, heirs, permitted assigns and permitted transferees;

“ assets ” includes present and future properties, revenues and rights of every description;

a “ Finance Document ” or any other agreement or instrument is a reference to that Finance Document or other agreement or instrument as amended, novated, supplemented,
extended or restated;

“ indebtedness ” includes any obligation (whether incurred as principal or as surety) for the payment or repayment of money, whether present or future, actual or contingent;

a  “  person ”  includes  any  person,  firm,  corporation,  government,  state  or  agency  of  a  state  or  any  association,  trust  or  partnership  (whether  or  not  having  separate  legal
personality) or two or more of the foregoing;

6

 
 
 
 
 
 
 
 
 
(vi)

a “ regulation ” includes any regulation, rule, official directive, request or guideline (whether or not having the force of law, but if not having the force of law being one with
which it is the practice of the relevant person to comply) of any governmental, intergovernmental or supranational body, agency, department or regulatory, self-regulatory or
other authority or organisation;

(vii)

a “ Clause ” or a “ Schedule ” is a reference to a clause of, or a schedule to, this Agreement;

(viii)

“ $ , “ USD ” and “ US dollar ” denote the lawful currency of the United States of America;

(ix)

(x)

(xi)

“ RMB ” denotes the lawful currency of the People's Republic of China;

a provision of law is a reference to that provision as amended or re- enacted; and

a time of day is a reference to London time.

(b)

(c)

(d)

Unless a contrary  indication appears, a term used in any  other Finance Document or in any notice given under or in connection with any Finance Document has the same meaning in
that Finance Document or notice as in this Agreement.

Clause and Schedule headings are for ease of reference only.

A Default or Event of Default is “ continuing ” if it has not been waived in writing.

1.3

Third party rights

(a)

Unless expressly provided to the contrary in this Agreement a person who is not a Party has no right under the Contracts (Rights of Third Parties) Act 1999 to enforce or to enjoy the
benefit of any term of this Agreement.

(b)

Notwithstanding any term of this Agreement the consent of any person who is not a Party is not required to rescind or vary this Agreement at any time.

2.

2.1

THE FACILITY

Facility A

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility A Commitment.

7

 
 
 
 
 
 
2.2

Facility B

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility B Commitment.

2.3

Facility C

Subject to the terms of this Agreement, the Lender makes available to the Borrower a US dollar term loan facility in an aggregate amount equal to the Facility C Commitment.

3.

PURPOSE

(a)

The Borrower shall only apply the amounts borrowed by it under each Facility to finance amounts requested to be borrowed by Qoros pursuant to the terms of the applicable Qoros
Loan Agreement; it is understood that such amounts are intended only to be used by Qoros for its ordinary course working capital requirements and not for any other purpose.

(b)

The Lender is not bound to monitor or verify the application of any amount borrowed pursuant to this Agreement.

4.

4.1

DRAWDOWN

Initial Conditions Precedent

The Lender will only be obliged to advance a Loan to the Borrower if:

(a)

(b)

(c)

the Lender has received all of the documents and other evidence listed in Schedule 1 ( Conditions Precedent to initial utilisation ) in form and substance satisfactory  to the Lender
(acting reasonably) save to the extent that the Lender has waived receipt of the same;

no Default (and no Qoros Default under either Qoros Loan Agreement) is continuing or would result from the proposed Loan; and

each of the representations and warranties set out in  Clause 10 ( Representations and Warranties ) is true and correct on the date of this Agreement and on the Utilisation Date.

4.2

Conditions Precedent to utilisation of a Facility B Loan

In addition to satisfaction of the conditions set out in Clause 4.1 ( Initial Conditions Precedent ) above, the Lender will only be obliged to advance a Loan to the Borrower under Facility B if:

(a)

the proposed Loan is required to fund an amount requested to be borrowed by Qoros pursuant to the Initial Qoros Loan Agreement;

8

 
 
 
(b)

(c)

(d)

the Lender has received a copy of the applicable executed Additional Chery Loan Agreement that corresponds to the Initial Qoros Loan Agreement;

the Lender in its sole discretion has agreed and consented to the advance of such Loan; and

the Lender has received evidence that the amount requested to be borrowed by Qoros under the Initial Qoros Loan Agreement is equal to the amount to be drawn by Qoros under the
applicable Additional Chery Loan Agreement that corresponds to the Initial Qoros Loan Agreement.

4.3

Conditions Precedent to utilisation of a Facility C Loan

In addition to satisfaction of the conditions set out in Clause 4.1 ( Initial Conditions Precedent ) above, the Lender will only be obliged to advance a Loan to the Borrower under Facility C if:

(a)

(b)

(c)

(d)

the proposed Loan is required to fund an amount requested to be borrowed by Qoros pursuant to the Additional August 2016 Qoros Loan Agreement;

the Lender has received a copy of the applicable executed Additional Chery Loan Agreement that corresponds to the Additional August 2016 Qoros Loan Agreement;

the Lender has received evidence that the amount requested to be borrowed by Qoros under the Additional August 2016 Qoros Loan Agreement is equal to the amount to be drawn by
Qoros under the applicable Additional Chery Loan Agreement that corresponds to the Additional August 2016 Qoros Loan Agreement; and

the  Borrower  having  obtained  all  required  governmental,  creditor  and  partner  consents,    including      appropriate  foreign      debt    quota  or  other      necessary  regulatory  approvals  in
connection with the Additional August 2016 Qoros Loan Agreement.

4.4

Drawdown

(a)

(b)

(c)

(d)

(e)

The Borrower may borrow a Loan by giving the Lender a duly completed Utilisation Request. Unless the Lender otherwise agrees, the latest time for receipt by the Lender of such
Utilisation Request is 9.30 a.m. (London time) three Business Days before the proposed Utilisation Date.

No more than one Loan may be drawn under Facility A.

No more than 10 Loans may be drawn under Facility B.

No more than 10 Loans may be drawn under Facility C.

A Utilisation Request for a Loan is irrevocable and will not be regarded as having been duly completed unless:

9

 
 
 
 
(i)

(ii)

(iii)

it specifies a Utilisation Date that is a Business Day prior to the Termination Date;

with respect to a Facility A Loan, the amount of the Loan requested is $25,000,000;

with  respect  to  a  Facility  B  Loan  or  a  Facility  C  Loan  (as  applicable),  the  amount  of  the  Loan  requested  is  a  minimum  of  $100,000  or,  if  less,  the  relevant  Available
Commitments; and

(iii)

the currency of the Loan is USD;

(f)

Subject to satisfaction or waiver of the conditions precedent set out in Clause 4.1 ( Initial Conditions Precedent ),  4.2 ( Conditions Precedent to utilisation of a Facility B Loan ) and /
or 4.3 ( Conditions Precedent to utilisation of a Facility C Loan ) (as applicable), the Lender shall advance the Loan to the Borrower.

4.5

Issuance of Class B Interests

On the first Utilisation Date, the Borrower shall issue to the Lender Class B Interests representing all of the Class B Interests in accordance with the Initial LLC Agreement.

5.

5.1

REPAYMENT AND MANDATORY PREPAYMENT

Repayment of Loans

Subject to Clause 16 ( Limited Recourse ), unless the Loans have been converted into Class A Interests of the Borrower pursuant to the terms of this Agreement and the LLC Agreement, the
Borrower shall repay each Loan in full on the Termination Date.

5.2

No reborrowing

The Borrower may not reborrow any part of any Loan which is repaid or pre-paid.

5.3

Voluntary Prepayment

The Borrower may, by giving not less than 3 Business Days’ prior notice to the Lender, prepay the whole or any part of any Loan.

5.4

Mandatory Prepayment – Excess Loan Amount

If the amount of a Loan (the “ Relevant Loan ”) advanced to the Borrower in connection with the corresponding Qoros Loan Agreement exceeds the amount advanced by the Borrower to
Qoros under that Qoros Loan Agreement (the “ Relevant Qoros Loan ”) (the amount of such excess being the “ Excess Loan Amount ”), the Borrower shall, within 5 Business Days of the
drawdown of the Relevant Qoros Loan, apply an amount equal to the Excess Loan Amount in prepayment of the Relevant Loan.

10

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5.5

Mandatory Prepayment – Qoros repayment

(a)

Subject to Clause 16 ( Limited Recourse ), if the Borrower receives any amount from Qoros (1) as repayment or prepayment of any amounts owing by Qoros to the Borrower under
either Qoros Loan Agreement or (2) in connection with the Borrower’s enforcement of its rights under the Qoros Security Agreement, the Borrower shall, as soon as practicable (and
in any case, within 3 Business Days of receipt of such amount), apply such amount converted into US dollars (a “Converted Amount” ) in prepayment of the Loans in the following
order:

(i)

(ii)

(iii)

(iv)

firstly, in prepayment of the Facility A Loan;

secondly, in prepayment of any Facility B Loan (pro-rata);

thirdly, in prepayment of any Facility C Loan (pro-rata); and

fourthly, in prepayment of any other amount outstanding under the Finance Documents.

For the avoidance of doubt, if any Converted Amount is greater than the amount required to prepare the Facilities (or any relevant part thereof), the Borrower shall still be required to
pay any such excess amount to the Lender (and the Lender shall be entitled to be paid the same), notwithstanding any provisions to the contrary in the Finance Documents.

(b)

Subject to Clause 16 ( Limited Recourse ), if, in any applicable jurisdiction, it becomes unlawful for the Lender to perform any of its obligations under any of the Finance Documents
to which it is a party or to fund or maintain any Loan, the Lender shall promptly notify the Borrow on becoming aware of that event and the Borrower shall within 3 Business Days
repay such Loan.

5.6

Deemed Repayment

If:

(a)

(b)

then:

(i)

(ii)

(iii)

the Qoros Loan Agreements are (or deemed, pursuant to Clause 7 ( Conversion )) repaid in full; and

the Borrower has applied all amounts it has received from Qoros under the Qoros Loan Agreements in the prepayment of the Facilities in accordance with Clause 5.5 ( Mandatory
Prepayment – Qoros repayment ),

all outstanding Loans shall be deemed to be repaid in full;

the Facilities shall be terminated and cancelled in full;

all obligations and amounts owing by the Borrower under the Finance Documents shall be deemed satisfied and discharged in full other than the obligations pursuant to Clause 15 (
Secondary Sale ), which shall survive;

11

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(iv)

the obligations owing by the Borrower under the Assignment Agreement shall be released and discharged in full (and the Lender undertakes to the Borrower that it will execute and
deliver any termination, release or other document, and take all other commercially reasonable actions, required by the Borrower to give effect to the release and discharge of the
Assignment Agreement); and

(v)

any Class B Interests issued to the Lender pursuant to the terms of this Agreement (including any rights attaching thereto) shall be cancelled in accordance with the LLC Agreement.

6.

6.1

INTEREST

Calculation of interest

The rate of interest payable on a Loan is 6.00% per annum.

6.2

Accrued interest

Interest shall accrue daily (calculated on the basis of a 360 day year) and shall be payable on the Termination Date and on any date a Loan is repaid or prepaid (but only in respect of the interest
that has accrued on the amount of such Loan paid or repaid) .

6.3

Interest Rate Limitation

Notwithstanding anything herein to the contrary, if at any time the interest rate applicable to any utilisation, together with all fees, charges and other amounts which are treated as interest on
such utilisation under applicable law (collectively the “Charges”), shall exceed the maximum lawful rate (the “Maximum Rate” ) which may be contracted for, charged, taken, received or
reserved by the Lender holding such utilisation in accordance with applicable law, the rate of interest payable in respect of such utilisation, together with all Charges payable in respect thereof,
shall be limited to the Maximum Rate and, to the extent lawful, the interest and Charges that would have been payable in respect of such utilisation but were not payable as a result of the
operation of this Clause 6.3 shall be cumulated and the interest and Charges payable to such Lender in respect of other utilisation or periods shall be increased (but not above the Maximum
Rate therefor) until such cumulated amount, together with interest thereon at the Maximum Rate (to the extent permitted by applicable law) to the date of repayment, shall have been received
by such Lender.

7.

CONVERSION

(a)

Whilst any amounts owing by the Borrower under this Agreement are outstanding, and subject to paragraph (i) below and the terms of the LLC Agreement:

(i)

upon completion of a Qualified Financing (other than a Qualified Financing that results in repayment of all of the outstanding Loans), the Lender’s percentage of Class B
Interests equal to the following:

X = A / (A + B + C)

12

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment;

B = the Facility B Commitment; and

C = the Facility C Commitment,

shall automatically convert into Class A Interests (the “ Facility A Class B Conversion ”) with the Lender’s percentage of Class A Interests following the Facility A Class
B Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount outstanding under the Facility A Loan as at the Conversion Date;

B = the amount of all accrued and unpaid interest on the outstanding Facility A Loan as at the Conversion Date;

C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified Financing; and
(ii) the implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the Qualified Financing involves
an  investment  or  financing  by  a  method  or  means  other  than  the  subscription  of  equity  interests  in  Qoros,  the  stated  equity  value  of  Qoros  as  set  out  in  such
Qualified Financing as agreed by the Borrower and the Lender), (iii) less a discount of 10%,

with (A + B) / C expressed as a percentage;

(ii)

subject  to  paragraphs  (c)  and  (d)  below,  following  commencement  of  a  Qualified  Financing  (other  than  a  Qualified  Financing  that  results  in  repayment  of  all  of  the
outstanding Loans), but prior to completion of the Qualified Financing, the Lender may by written notice to the Borrower  (the “ Facility B Conversion/Repayment Notice
”) request that either:

(A)

the Lender’s percentage of Class B Interest equal to the following:

X = B  / (A + B + C)

13

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment; and

B = the Facility B Commitment

C = the Facility C Commitment,

be converted into Class A Interests and, upon completion of the Qualified Financing, the percentage of Class B Interests held by the Lender calculated in
accordance with the above formula shall be converted into Class A Interests (the “ Facility B Class B Conversion ”) with the Lender’s percentage of Class A
Interests following the Facility B Class B Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount of all outstanding Facility B Loans  as at the Conversion Date;

B = the amount of all accrued and unpaid interest on all outstanding Facility B Loans as at the Conversion Date;

C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified
Financing; and (ii) the implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the
Qualified Financing involves an investment or financing by a method or means other than the subscription of equity interests in Qoros, the stated equity
value of Qoros as set out in such Qualified Financing as agreed by the Borrower and the Lender), (iii) less a discount of 10%,

with (A + B) / C expressed as a percentage; or

(B)

the Borrower take all action available to it under clause 11.1 of the Initial Qoros Loan Agreement to require repayment by Qoros of all outstanding Quantum
Facility B Loans (as defined in the Initial Qoros Loan Agreement) (together with accrued and unpaid interest) immediately following completion of the Qualified
Financing  and the Borrower  shall  undertake  such action  (the  amount  received  by the Borrower  from  Qoros as result  of taking  such action  being the “  Qoros
Facility B Repayment Amount ”) and, subject to Clause 16 ( Limited Recourse ), the Borrower shall, within 3 Business Days of the receipt of the Qoros Facility
B Repayment Amount, apply such amount converted into US dollars in prepayment of the Facility B Loans and (pro-rata);

14

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(iii)

subject  to  paragraphs  (c)  and  (d)  below,  following  commencement  of  a  Qualified  Financing  (other  than  a  Qualified  Financing  that  results  in  repayment  of  all  of  the
outstanding  Loans),  but  prior  to  completion  of  the  Qualified  Financing,  the  Lender  may  by  written  notice  to  the  Borrower    (the  “  Facility  C  Conversion/Repayment
Notice ”) request that either:

(A)

the Lender’s percentage of Class B Interest equal to the following:

X = C / (A + B + C)

where,

X = the percentage of the Lender’s Class B Interests;

A = the Facility A Commitment; and

B = the Facility B Commitment

C = the Facility C Commitment,

be converted into Class A Interests and, upon completion of the Qualified Financing, the percentage of Class B Interests held by the Lender calculated in
accordance with the above formula shall be converted into Class A Interests (the “ Facility C Class B Conversion ”) with the Lender’s percentage of Class A
Interests following the Facility C Class B Conversion calculated in accordance with the following formulation:

Y = (A + B) / C

where,

Y = the percentage of the Lender’s Class A Interests;

A = the aggregate principal amount of all outstanding Facility C Loans  as at the Conversion Date;

B = the amount of all accrued and unpaid interest on all outstanding Facility C Loans as at the Conversion Date;

15

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
C = the implied equity value of the Borrower based upon: (i) the ownership interest of the Borrower in Qoros after giving effect to the Qualified Financing; and (ii) the
implied equity value of Qoros as set out in the Qualified Financing as agreed by the Borrower and the Lender (or, where the Qualified Financing involves an
investment or financing by a method or means other than the subscription of equity interests in Qoros, the stated equity value of Qoros as set out in such Qualified
Financing as agreed by the Borrower and the Lender), (iii) less a discount of 25%,

with (A + B) / C expressed as a percentage; or

(B)

the Borrower take all action available to it under clause 11.1 of the Additional August 2016 Qoros Loan Agreement to require repayment by Qoros of all outstanding Loans
(as defined in the Additional August 2016 Qoros Loan Agreement) (together with accrued and unpaid interest) immediately following completion of the Qualified Financing
and the Borrower shall undertake such action (the amount received by the Borrower from Qoros as result of taking such action being the “ Qoros Facility C Repayment
Amount ”) and, subject to Clause 16 ( Limited Recourse ), the Borrower shall, within 3 Business Days of the receipt of the Qoros Facility C Repayment Amount, apply such
amount converted into US dollars in prepayment of the Facility C Loans and (pro-rata).

The Borrower hereby undertakes to promptly notify the Lender on becoming aware that the terms of a Qualified Financing have been agreed, and further undertakes to set out in such
notification all material details and terms of the proposed Qualified Financing (including expected completion date of the Qualified Financing) as the Borrower is then aware of.

If:

(i)

(ii)

the terms of the Qualified Financing as proposed at the time of a Facility Conversion/Repayment Notice subsequently change in any material respect at any time prior to
completion of the Qualified Financing; or

completion of the Qualified Financing has not occurred prior to the anticipated date of completion of the Qualified Financing at the time a Facility Conversion/Repayment
Notice was provided to the Borrower,

then at, or prior to, completion of the Qualified Financing, the Lender may submit a further notice (the “ Further Facility Conversion/Repayment Notice ”) to the Borrower:

16

(b)

(c)

 
 
 
 
 
 
 
(x)

requesting that the Borrower disregard the relevant Further Facility Conversion/Repayment Notice (and confirming that the Borrower’s failure to comply with such Facility
Conversion/Repayment Notice shall not constitute a breach of any term of this Agreement); and

(1)

(2)

in respect of a Facility B Conversion/Repayment Notice, setting out a new election under either paragraph (a)(ii)(A) or (a)(ii)(B); or

in respect of a Facility C Conversion/Repayment Notice, setting out a new election under either paragraph (a)(iii)(A) or (a)(iii)(B),

and the Borrower shall comply with such Further Facility Conversion/Repayment Notice in accordance with paragraph (a)(ii)(A), (a)(ii)(B), (a)(iii)(A) or (a)(iii)(B) (as applicable).

(d)

If the Borrower has not repaid: (1) the Facility B Loans within a reasonable period after the Lender has made an election for such repayment under paragraph (a)(ii)(B); or (2) the
Facility  C  Loans  within  a  reasonable  period  after  the  Lender  has  made  an  election  for  such  repayment  under  paragraph  (a)(iii)(B),  (in  each  case,  whether  pursuant  to  a  Facility
Conversion/Repayment  Notice  or  a  Further  Facility  Conversion/Repayment  Notice)  then  the  Lender  may  at  any  time  thereafter  submit  a  further  notice  (the  “  Facility Conversion
Notice ”) to the Borrower:

(i)

requesting that the Borrower disregard the relevant Facility Conversion/Repayment Notice or Further Conversion/Repayment Notice, as applicable (and confirming that the
Borrower’s failure to comply with such Facility Conversion/Repayment Notice or Further Conversion/Repayment Notice, as applicable, shall not constitute a breach of any
term of this Agreement); and

(ii)

setting out a new election under paragraph (a)(ii)(A) or (a)(iii)(A) (as applicable),

and the Borrower shall comply with such Facility Conversion Notice in accordance with paragraph (a)(ii)(A) or (a)(iii)(A), as applicable. For the avoidance of doubt, the Parties agree
that a Facility Conversion Notice may be sent by the Lender even after, and notwithstanding, the completion of a Qualified Financing.

(e)

Upon the Facility A Class B Conversion pursuant to paragraph (a)(i) above and the LLC Agreement:

(i)

(ii)

the Facility A Loan shall be deemed to be repaid in full;

Facility A shall be terminated and cancelled in full.

17

 
 
 
 
 
(f)

Upon the Facility B Class B Conversion pursuant to paragraph (a)(ii)(A) above and the LLC Agreement:

(i)

(ii)

all outstanding Facility B Loans shall be deemed to be repaid in full; and

Facility B shall be terminated and cancelled in full.

(g)

Upon the Facility C Class B Conversion pursuant to paragraph (a)(iii)(A) above and the LLC Agreement:

(i)

(ii)

all outstanding Facility C Loans shall be deemed to be repaid in full; and

Facility C shall be terminated and cancelled in full.

(h)

Upon the later of a Facility A Class B Conversion, Facility B Class B Conversion and Facility C Class B Conversion:

(i)

(ii)

all obligations and amounts owing by the Borrower under the Finance Documents shall be deemed satisfied and discharged in full other than the obligations pursuant to
Clause 15 ( Secondary Sale) , which shall survive;

the obligations owing by the Borrower under the Assignment Agreement shall be released and discharged in full (and the Lender undertakes to the Borrower that it will
execute and deliver any termination, release or other document, and take all other commercially reasonable actions, required by the Borrower to give effect to the release and
discharge of the Assignment Agreement); and

(iii)

any Class B Interests issued to the Lender pursuant to the terms of this Agreement (including any rights attaching thereto) shall be cancelled.

(i)

If, upon completion of a Qualified Financing, the Qoros Loan Agreements are repaid in full:

(i)

(ii)

Clause 7(a), (b), (c), (d), (e), (f), (g) and (h) shall not apply;

the amounts received by the Borrower from Qoros as a result of the repayment of the Qoros Loan Agreements shall be applied in accordance with Clause 5.5 ( Mandatory
Prepayment -   Qoros repayment ) (and, for the avoidance of doubt, Clause 5.6 ( Deemed Repayment ) shall apply).

8.

TAX AND OTHER DEDUCTIONS

Each Party shall pay all its own present and future Tax as may be levied by a respective government or governmental body in relation to the Finance Documents.

18

 
 
 
 
 
 
 
 
9.

COSTS AND EXPENSES

Each Party shall pay its own costs and expenses that it incurs in connection with the negotiation, preparation and execution of this agreement and/or the other Finance Documents.

10.

REPRESENTATIONS AND WARRANTIES

The  Borrower  makes  the  representations  and  warranties  set  out  in  this  Clause  10  to  the  Lender  on  the  date  of  this  Agreement  and  on  each  Utilisation  Date  by  reference  to  the  facts  and
circumstances then existing.

10.1

Status

(a)

(b)

It is a limited liability company, duly formed and validly existing under the laws of the State of Delaware.

It has the power to own its assets and carry on its business as it is being conducted.

10.2

Binding obligations

Subject to the Legal Reservations, the obligations expressed to be assumed by it in each Finance Document, the Qoros Security Agreement and the Qoros Loan Agreements are legal, valid,
binding and enforceable obligations.

10.3

Non-conflict with other obligations

The  entry  into  and  performance  by  it  of,  and  the  transactions  contemplated  by,  each  of  the  Finance  Documents,  the  Qoros  Loan  Agreements,  the  Qoros  Security  Agreement  and  any  other
material contract or agreement to which it is a party do not conflict with:

(a)

(b)

any law or regulation applicable to it; or

the constitutional documents of the Borrower.

10.4

Power and authority

It has the power to enter into, perform and deliver, and has taken all necessary action to authorise the entry into, performance and delivery of:

(a)

(b)

each Finance Document to which it is a party and the transactions contemplated by those Finance Documents; and

the Qoros Loan Agreements and Qoros Security Agreement and  the transactions contemplated by the Qoros Loan Agreements and Qoros Security Agreement.

19

 
 
 
 
 
 
 
10.5

Approval of this Agreement as a related party transaction

The Loans and other transactions contemplated by this Agreement and related agreements have been approved by Kenon in accordance with: (a) all applicable laws and regulations; (b) its
policies and procedures applicable to related party transactions, as described in Kenon’s annual report on Form 20-F for the fiscal year ended 31 December 2014 filed with the U.S. Securities
and Exchange Commission on 31 March 2015; and (c) all applicable stock exchange rules applicable to the approval of related party transactions.

11.

INFORMATION UNDERTAKINGS

The undertakings in this Clause 11 remains in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

11.1

Notification of default

The Borrower shall notify the Lender of:

(a)

(b)

any Default (and the steps, if any, being taken to remedy it);

any Qoros Default under either Qoros Loan Agreement or any default under the Qoros Security Agreement,

in each case, promptly upon becoming aware of its occurrence.

11.2

Information: miscellaneous

The Borrower shall supply to the Lender:

(a)

(b)

promptly upon becoming aware of them, the details of any litigation, arbitration or administrative proceedings which are current, threatened or pending against the Borrower or Qoros,
and which, if adversely determined, are reasonably likely to have a Material Adverse Effect; and

promptly  on  request,    such  further  information  regarding  the  financial  condition,  assets  and  operations  of  the  Borrower  and,  to  the  extent:  (i)  such  information  is  available  to  the
Borrower; and (ii) disclosure of such information would not breach the terms of any agreement or arrangement entered into by the Borrower, Qoros as the Lender may reasonably
request.

12.

GENERAL UNDERTAKINGS

The undertakings in this Clause 12 remain in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

12.1

Compliance with laws

The Borrower shall comply in all respects with all laws to which it may be subject, if failure so to comply would impair its ability to perform its obligations under the Finance Documents, the
Qoros Security Agreement or either Qoros Loan Agreement.

20

  
  
 
 
 
 
 
 
  
 
 
 
 
  
12.2

Acquisitions

The Borrower shall not, without the prior written consent of the Lender:

(a)

(b)

acquire a company or any shares or securities or a business or undertaking (or, in each case, any interest in any of them) (other than shares in Qoros); or

incorporate a company.

12.3

Disposals

(a)

(b)

The  Borrower  shall  not  enter  into  a  single  transaction  or  a  series  of  transactions  (whether  related  or  not)  and  whether  voluntary  or  involuntary  to  sell,  lease,  transfer  or  otherwise
dispose of any asset, including all or a portion of its legal or beneficial interests in Qoros.

Paragraph (a) above does not apply  to any  sale, lease, transfer or other disposal made by the Borrower pursuant to the terms of the Finance Documents or the LLC Agreement or to the
Exim Pledges.

12.4

Holding company status

The Borrower undertakes that:

(a)

(b)

it is and will remain a special purpose, holding company; and

it will not incur any liabilities except: (i) as contemplated in the Finance Documents, the LLC Agreement, the Qoros Loan Agreements, the Qoros Security Agreement and any other
agreement entered into by the Borrower in connection with the aforementioned documents (including the “finance documents” as defined in the Qoros Loan Agreements); and (ii) for
liabilities that arise in the ordinary course of acting as a special purpose, holding company.

12.5

Membership interests

The Borrower shall not issue any membership interests except:

(a)

(b)

as permitted pursuant to the terms of a Finance Document; or

in accordance with the terms of the LLC Agreement.

12.6

Change of business

The Borrower shall ensure that no substantial change is made to the general nature of the business of the Borrower from that carried on at the date of this Agreement.

12.7

Qoros Security Agreement

(a)

The Borrower shall not (and shall not take any action to) enforce, discharge, release or terminate any of its rights under the Qoros Security Agreement except: (i) in accordance with
and pursuant to Clause 14.4 ( Enforcement under Qoros Security Agreement ); (ii) to the extent required in order to comply with Clause 12.10 ( Undertaking to amend Qoros Security
Agreement ); or (iii) with the prior written consent of the Lender.

21

 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
(b)

The Borrower shall notify the Lender promptly on becoming aware of any request   to   enforce,   discharge,   release   or   terminate   any   of   the   Borrower’s   rights under the Qoros
Security Agreement other than a request to enforce, discharge, release or terminate from the Lender pursuant to Clause 14.4 ( Enforcement under Qoros Security Agreement ) or in
connection with Clause 12.10 ( Undertaking to amend Qoros Security Agreement ).

12.8 Qoros Loan Agreements

The Borrower shall:

(a)

(b)

(c)

(d)

not amend the terms of, or waive any of its rights under, either Qoros Loan Agreement without the prior written consent of the Lender;

not  waive any default  or event  of  default  (howsoever described) that  has occurred under either Qoros Loan Agreement without the prior written consent of the Lender;

not take any other action in connection with either Qoros Loan Agreement that may adversely affect the rights and interests of the Lender; and

use any amounts borrowed by it under each Facility  to finance amounts requested to be borrowed by Qoros pursuant to the terms of the Qoros Loan Agreements.

12.9

Conditions Subsequent

The Borrower shall:

(a)

(b)

use  its  best  efforts  to  ensure  that  within  134  days  of  the  date  of  this  Agreement  (the  “  CS Period ”),  it  will  provide  the  Lender  with  a  copy  of  the  duly  executed  Qoros  Security
Agreement;

within 5 days of the date of execution of the Qoros Security Agreement, deliver to the Lender the Assignment Agreement, in a form substantially the same as that agreed to by the
Lender and the Borrower pursuant to Paragraph 3(a) of Schedule 1 ( Conditions precedent to initial utilisation ), duly executed by the Borrower,

except that:

(i)

the period between: (1) the date a definitive and binding agreement relating to a Qualified Financing is signed; and (2) the date on which such agreement is terminated or it is otherwise
apparent  that  the  proposed  Qualified  Financing  will  not  be  consummated  (the  “  QF  Termination  Date  ”),  shall  not  be  accounted    for      in    (and    shall    be    excluded    from)    the 
calculation    and  determination  of  the  CS  Period  (it  being  agreed,  for  the  avoidance  of  doubt,  that  any  time  period  after  such  QF  Termination  Date  shall  be  accounted  for  in  the
calculation and determination of the CS Period); and

22

 
 
  
 
 
 
  
 
 
 
 
(ii)

following the completion of a Qualified Financing, the obligations in paragraphs (a) and (b) above shall not apply.

12.10 Undertaking to amend Qoros Security Agreement

Following:

(a)

(b)

the due execution of the Additional August 2016 Qoros Loan Agreement;

the Borrower having obtained all required governmental, creditor and partner approvals and consents, including appropriate foreign debt quota or other necessary regulatory approvals
in connection with the Additional August 2016 Qoros Loan Agreement; and

(c)

the registration of the Additional August 2016 Qoros Loan Agreement with the relevant PRC government body,

the Borrower shall, upon written request by the Lender, use its best efforts to amend the Qoros Security Agreement so that the Qoros Security Agreement secures all present and future moneys,
debts  and  liabilities  due,  owing  or  incurred  by  Qoros  under  or  in  connection  with  the  Additional  2016  Qoros  Loan  Agreement  (the  required  amendments  being  the  “  Qoros  Security
Amendments ”), including using its best efforts to obtain the approval of the State Intellectual Property Office of the PRC (“ SIPO ”) and all other governmental, creditor and partner approvals
and consents required in connection with the Qoros Security Amendments (a failure to obtain such approvals and consents shall not be considered a breach by the Borrower of its obligations
under this Clause 12.10).

13.

EVENTS OF DEFAULT

Each of the events or circumstances set out in Clauses 13.1 ( Non-payment) to 13.14 ( Assignment Agreement ) (inclusive) is an Event of Default.

13.1          Non-payment

Subject to Clause 5.6 ( Deemed Repayment ) and Clause 16 ( Limited Recourse ), the Borrower does not pay on the due date any amount payable pursuant to a Finance Document at the place
and in the currency in which it is expressed to be payable unless:

(a)

(b)

its failure to pay is caused by administrative or technical error; and

payment is made within 5 Business Days of its due date.

23

 
 
 
 
 
 
 
 
 
13.2

Other obligations

(a)

(b)

The  Borrower does  not comply  with  any provision  of this  Agreement  (other  than  those referred  to  in Clause  13.1 (  Non-payment ), Clause  13.10  ( Disposals ) and Clause  13.14  (
Assignment Agreement )).

No Event of Default under paragraph (a) above will occur if the failure to comply is capable of remedy and is remedied within 15 Business Days of the earlier of: (i) the Lender giving
notice to the Borrower; and (ii) the Borrower becoming aware of the failure to comply.

13.3

Misrepresentation

(a)

(b)

Any representation or statement made or deemed to be made by the Borrower in this Agreement is or proves to have been materially incorrect or materially misleading when made or
deemed to be made.

No Event of Default under paragraph (a) above will occur if the circumstances giving rise to the misrepresentation or misstatement are capable of remedy and are remedied within 15
Business Days of the earlier of:

(i)

(ii)

13.4

Cross default

the Lender giving written notice of the failure by the Borrower; and

the   Borrower   becoming   aware   of   the   misrepresentation  or misstatement.

(a)

(b)

(c)

Any  Financial Indebtedness of the Borrower (other than Financial Indebtedness of the Borrower under this Agreement) is not paid when due nor within any originally applicable grace
period.

Any  Financial Indebtedness of the Borrower (other than Financial Indebtedness of the Borrower under this Agreement) is declared to be or otherwise becomes due and payable prior to
its specified maturity as a result of an event of default (however described).

No Event of Default will occur under this Clause 13.4 if the aggregate amount of Financial Indebtedness falling within paragraphs (a) or (b) above is less than RMB 50,000,000 (or its
equivalent in any other currency or currencies).

13.5

Insolvency

(a)

Subject to Clause 16 ( Limited Recourse ), the Borrower is unable or admits inability to pay its debts as they fall due or is declared to be unable to pay its debts under applicable law or,
by reason of actual or anticipated financial difficulties, suspends making payments on any of its debts (for the avoidance of doubt, the application of Clause 16 ( Limited Recourse )
shall  not  constitute  a  suspension  of  the  payment  of  the  Borrower’s  debt)  or  commences  negotiations  with    one  or  more  of  its    creditors    with    a  view  to    rescheduling  any  of  its
indebtedness (other than with the Lender).

24

 
 
 
 
 
 
 
 
 
 
  
(b)

A moratorium is declared in respect of any indebtedness of the Borrower.

13.6

Insolvency Proceedings

(a)

The filing of an involuntary proceeding is made in a court of competent jurisdiction in the United States seeking relief under US Bankruptcy Law in respect of the Borrower and either
such proceeding shall continue undismissed for 60 days or an order or decree approving or ordering any of the foregoing shall be entered or the Borrower shall consent to the institution
of, or fail to contest in a timely and appropriate manner, any such involuntary proceeding.

(b)

The filing of a voluntary  petition by  the Borrower is made under US Bankruptcy Law.

13.7

Unlawfulness

(a)

(b)

(c)

It is or becomes unlawful for the Borrower to perform any of its material obligations under any Finance Document.

Subject to the Legal Reservations, any  obligation or obligations of the Borrower under any Finance Document are not or cease to be legal, valid, binding or enforceable.

Any Finance Document ceases to be in full force and effect.

13.8

Repudiation

The Borrower repudiates a Finance Document to which it is a party or evidences an intention to repudiate a Finance Document to which it is a party.

13.9

Expropriation

The authority or ability of the Borrower to conduct its business is limited or wholly or substantially curtailed by any seizure, expropriation, nationalisation,  intervention, restriction or other
action  by  or  on  behalf  of  any  governmental,  regulatory  or  other  authority  or  other  person  in  relation  to  it  or  any  of  its  assets  which  limitation  or  curtailment  (taking  into  consideration  any
compensation or payment received in respect thereof) has, or is reasonably expected to have, a Material Adverse Effect.

13.10 Disposals

(a)

(b)

The Borrower sells, transfers or otherwise disposes of any portion of its legal or beneficial interests in Qoros in any single transaction or series of related transactions.

No Event of Default will occur under paragraph (a) above if the sale, transfer or other disposal of the Borrower’s legal or beneficial interests in Qoros is made by the Borrower pursuant
to the terms of the Finance Documents or the LLC Agreement or to the Exim Pledges.

25

 
 
 
 
 
 
 
 
 
 
 
13.11

Interests in Qoros

The Borrower creates or permits to subsist any Security Interest over its legal or beneficial interests in Qoros except:

(a)

(b)

(c)

as otherwise permitted under this Agreement, any other Finance Document or the LLC Agreement;

pursuant to the Exim Pledges; or

with prior written consent of the Lender.

13.12 Qoros Loan Agreements

The Borrower:

(a)

(b)

amends the terms of, or waives any of its rights under, either Qoros Loan Agreement without the prior written consent of the Lender; or

waives any default or event of default (howsoever described) that has occurred under either Qoros Loan Agreement without the prior written consent of the Lender.

13.13 Material Adverse Effect

Any event or circumstance occurs which has, or is reasonably expected to have, a Material Adverse Effect.

13.14 Assignment Agreement

The Borrower shall not have delivered to the Lender the Assignment Agreement (in a form substantially the same as that agreed to by the Lender and the Borrower pursuant to Paragraph 3(a) of
Schedule 1 ( Conditions precedent to initial utilisation )) duly executed by the Borrower within 5 days of the date of execution of the Qoros Security Agreement.

13.15 Acceleration

(a)

Subject to Clause 16 ( Limited Recourse ), whilst an Event of Default is continuing the Lender may, by written notice to the Borrower:

(i)

(ii)

cancel the Facilities whereupon the Facilities shall immediately be cancelled;

declare that all or part of any Loan (to the extent not repaid and to the extent the Facility A Class B Conversion and, if applicable, the Facility B Class B Conversion and/or
Facility C Class B Conversion has not occurred),  together with accrued and  unpaid  interest,  and all other amounts accrued or outstanding under the Finance Documents be
immediately due and payable, whereupon they shall become immediately due and payable; and/or

26

 
 
 
 
 
 
 
 
 
 
 
 
 
(iii)

declare that all or part of any Loan (to the extent not repaid) be payable on demand, whereupon it shall immediately become payable on demand; and/or

(iv)

exercise any or all of its rights, remedies, powers or discretions under the Finance Documents.

(b)

If an Event of Default occurs under Clause 13.6:

(i)

(ii)

the Total Commitments shall immediately be cancelled; and

all of the Loans, together with accrued interest and all other amounts accrued under the Finance Documents, shall be immediately due and payable,

in each case automatically and without any direction, notice, declaration or other act.

14.

TRIGGER EVENTS

Each of the events or circumstances set out in Clauses 14.1, 14.2 and 14.3 is a Trigger Event.

14.1

Acceleration of a Qoros Loan Agreement due to certain Events of Default

A Qoros Default pursuant to Section 10.5, 10.6 or 10.7 of either Qoros Loan Agreement has occurred and is continuing.

14.2

Qoros Security Agreement

The Borrower has not delivered to the Lender within 134 days of the date of this Agreement (the “ Relevant Period ”) a copy of the duly executed Qoros Security Agreement, except that:

(a)

the period between: (1) the date a definitive and binding agreement relating to a Qualified Financing is signed; and (2) the QF Termination Date, shall not be accounted  for   in  (and 
shall  be  excluded  from)   the  calculation  and determination of the Relevant Period (it being agreed, for the avoidance of doubt, that any time period after such QF Termination Date
shall be accounted for in the calculation and determination of the Relevant Period); and

(b)

following the completion of  a Qualified  Financing, the events and circumstances described in this Clause 14.2 shall no longer constitute a Trigger Event.

27

 
 
 
 
 
 
 
 
 
 
 
14.3

Other obligations

(a)

(b)

The Borrower does not comply with Clause 12.10 ( Undertaking to amend Qoros Security Agreement ).

No Trigger Event under paragraph (a) above will occur if the failure to comply is capable of remedy and is remedied within 15 Business Days of the earlier of: (i) the Lender giving
notice to the Borrower; and (ii) the Borrower becoming aware of the failure to comply.

14.4

Enforcement under the Qoros Security Agreement

Subject to Clause 16 ( Limited Recourse ), whilst a Trigger Event is continuing, the Lender may, by written notice to the Borrower:

(a)

request that the Borrower:

(i)

(ii)

(iii)

enforce the Qoros Security Agreement in accordance with the terms of the Qoros Security Agreement; and / or

take any action available to the Borrower under and in accordance with the terms of the Qoros Security Agreement and/or the Qoros Loan Agreements; and / or

take any actions to cause the Lender to have, or to direct the exercise of, any voting, consent or other similar rights to which the Borrower has as a creditor of Qoros in
respect of the Qoros Loan Agreements,

and the Borrower shall comply with such request as soon as reasonably practicable following such written notice (to the extent permitted under, and in accordance with, the terms of
the Qoros Security Agreement and the Qoros Loan Agreements).

15.

SECONDARY SALE

The  Borrower  acknowledges  and  agrees  that:  (i)  pursuant  to  Clause  12.3  (  Disposals ),  the  Borrower  is  restricted  from  selling,  leasing,  transferring  or  otherwise  disposing  of  any  asset,
including all or a portion of its legal or beneficial interests in Qoros without the prior written consent of the Lender; and (ii) to the extent that the Lender provides its prior written consent for
any such sale, lease, transfer or disposal, the Company shall   be   required   to   use   any   such   proceeds   (the   “ Transfer Proceeds ”) :

(a)

(b)

if prior to the later of: (i) the Facility A Class B Conversion; (ii) the Facility B Class B Conversion; and (iii) the Facility C Class B Conversion, for the repayment of the outstanding
amount, together with accrued and unpaid interest, under any Loan prior to using the Transfer Proceeds for any other purpose; and

if following the later of: (i) the Facility A Class B Conversion; (ii) the Facility B Class B Conversion; and (iii) the Facility C Class B Conversion, for the redemption of Class A
Interests at the then implied value of the Class A Interests in accordance with the LLC Agreement prior to using the Transfer Proceeds for any other purpose.

28

 
 
 
 
 
 
 
16.

LIMITED RECOURSE

Notwithstanding any other provision of this Agreement or any other Finance Document:

(a)

(b)

(c)

the Borrower shall only be required to repay or prepay a Loan and pay any other amounts due and payable under the Finance Document from, and only to the extent of, the amounts
the Borrower receives from Qoros under the Qoros Loan Agreements;

any claim by the Lender and any liability and obligation owing by the Borrower under the Finance Documents is limited to the amounts the Borrower receives from Qoros under the
Qoros Loan Agreements and the assets the subject of the Assignment Agreement (and the Lender shall have no further rights or remedies against the Borrower, and the Borrower shall
have no liability or obligation, for any further sum or amount under, or in connection with, the Finance Documents (a “ Further Sum ”)); and

the Lender shall not take any steps against the Borrower to recover any Further Sum (in particular, the Lender shall not institute against or join any person in instituting against the
Borrower any bankruptcy, reorganisation, arrangement, insolvency, administration, moratorium, liquidation, dissolution or similar proceedings, nor shall any such person be entitled to
make any claim in respect of, any Further Sum against the assets of the Borrower).

17.

ADMINISTRATION

17.1

Place of payments

All payments to be made by the Borrower under this Agreement shall be made to such account at such office or bank as the Lender may notify to the Borrower for this purpose form time to
time.

17.2

Business Days

(a)

(b)

Any payment which is due to be made on a day that is not a Business Day shall be made on the next Business Day in the same month (if there is one) or the preceding Business Day (if
there is not).

During any extension of the due date for payment of any principal or Unpaid Sum under this Agreement interest is payable on the principal or Unpaid Sum at the rate payable on the
original due date.

29

 
 
 
 
17.3

Currency of account

(a)

Subject to paragraph (b) below, and save as otherwise agreed by the Lender and the Borrower in relation to any prepayment due under this Agreement, USD is the currency of account
and payment for any sum due from the Borrower under any Finance Document.

(b)

Each payment in respect of costs, expenses or Taxes shall be made in the currency in which the costs, expenses or Taxes are incurred.

18.

ASSIGNMENT AND TRANSFER

18.1

Lender

The Lender may not assign or transfer any of its rights and obligations under any Finance Document to any person without the prior written consent of the Borrower.

18.2

Borrower

The Borrower may not assign or transfer any of its rights and obligations under any Finance Document to any person without the prior written consent of the Lender.

19.

NOTICES

19.1

Communications in writing

Any communication to be made under or in connection with the Finance Documents shall be made in writing and, unless otherwise stated, may be made by fax or international express courier
service.

19.2

Addresses

The address (and the department or officer, if any, for whose attention the communication is to be made) of each Party for any communication or document to be made or delivered under or in
connection with the Finance Documents is that identified with its name in the signature pages of this Agreement or any fax number or substitute address or department or officer as the Party
may notify to the other Party by not less than five Business Days’ notice.

19.3

Delivery

Any communication or document made or delivered by one person to another under or in connection with the Finance Documents will only be effective:

(a)

(b)

(c)

if by way of fax or email, when received in legible form;

if by way of personal delivery or post, when received; or

if by way of international express courier service, when it has been delivered at the relevant address as evidenced by the courier service records.

30

 
 
 
 
 
 
 
 
 
19.4

Language

All notices and communications pursuant to the Finance Documents shall be in the English language.

20.

CALCULATIONS AND CERTIFICATES

20.1

Accounts

In any litigation or arbitration proceedings arising out of or in connection with the Finance Documents, the entries made in the accounts maintained by the Lender are prima facie evidence of
the matters to which they relate.

20.2

Certificates and Determinations

Any certification or determination by the Lender of a rate or amount under the Finance Documents is, in the absence of manifest error, conclusive evidence of the matters to which it relates.

21.

PARTIAL INVALIDITY

If, at any time, any provision of this Agreement is or becomes illegal, invalid or unenforceable in any respect under any law of any jurisdiction, neither the legality, validity or enforceability of
the remaining provisions nor the legality, validity or enforceability of such provision under the law of any other jurisdiction will in any way be affected or impaired.

22.

REMEDIES AND WAIVERS

No failure to exercise, nor any delay in exercising, on the part of the Lender, any right or remedy under the Finance Documents shall operate as a waiver, nor shall any single or partial exercise
of any right or remedy prevent any further or other exercise or the exercise of any other right or remedy. The rights and remedies provided in the Finance Documents are cumulative and not
exclusive of any rights or remedies provided by law.

23.

AMENDMENTS AND WAIVERS

Any term of this Agreement may be amended or waived only with the consent of the Lender and the Borrower in writing.

24.

COUNTERPARTS

This Agreement may be executed in any number of counterparts, and this has the same effect as if the signatures on the counterparts were on a single copy of this Agreement.

25.

ENTIRE AGREEMENT

(a)

This Agreement, together with the other Finance Documents, constitutes the entire agreement between the Parties in relation to the obligations of each Party under this Agreement and
supersedes any previous agreement, whether express or implied, between the Parties.

31

 
 
 
(b)

Each Party acknowledges that in agreeing to enter into this Agreement it has not relied on any representation, warranty, collateral contract or other assurance (except those set out in
this Agreement and the documents referred to in it) made by or on behalf of any other Party before the signature of this Agreement. Each Party waives all rights and remedies which,
but for this Clause, might otherwise be available to that Party in respect of any such representation, warranty, collateral contract or other assurance.

(c)

Nothing in this Clause limits or excludes any liability for fraud.

26.

GOVERNING LAW AND ENFORCEMENT

26.1

Governing Law

This Agreement and any non-contractual obligations arising out of or in connection with it are governed by, and shall be construed in accordance with, English law.

26.2

Jurisdiction

(a)

(b)

(c)

The courts of England have exclusive jurisdiction to settle any dispute arising out of or in connection with this Agreement (including a dispute relating to the existence, validity or
termination of this Agreement or any non-contractual obligation arising out of or in connection with this Agreement) (a “ Dispute ”).

The Parties agree that the courts of England are the most appropriate and convenient courts to settle Disputes and accordingly no Party will argue to the contrary.

This Clause 26.2 is for the benefit of the Lender only. As a result, the Lender shall not be prevented from taking proceedings relating to a Dispute in any other courts with jurisdiction.
To the extent allowed by law, the Lender may take concurrent proceedings in any number of jurisdictions.

32

 
 
1.

The Borrower

(a)

A copy of the constitutional documents of the Borrower, including:

SCHEDULE 1
Conditions Precedent to initial utilization

(i)

(ii)

its certification of formation, certified as of a recent date by the relevant authority of the jurisdiction of organization of the Borrower; and

a certificate as to its existence and good standing as of a recent date from the relevant authority of the jurisdiction of organization of the Borrower.

(b)

A copy of a resolution of the member of the Borrower:

(i)

approving the terms of, and the transactions contemplated by, the Finance Documents to which it is a party and resolving that it execute the Finance Documents to which it is
a party;

(ii)

authorising a specified person or persons to execute the Finance Documents to which it is a party on its behalf; and

(iii)

authorising a specified person or persons, on its behalf, to sign and/or despatch all documents and notices to be signed and/or despatched by it under or in connection with the
Finance Documents to which it is a party.

(c)

(d)

A specimen of the signature of each person authorised by the resolution referred to in paragraph (b) above.

A certificate of an authorised signatory of the Borrower certifying that each copy document relating to it specified in this Paragraph 1 of Schedule 1 is correct, complete and in full
force and effect as at a date no earlier than 3 Business Days prior to the date of this Agreement.

2.

Finance Documents

(a)

(b)

This Agreement duly executed by the Borrower.

The agreed form of the Assignment Agreement, which shall include a completed and final Schedule 1 (as defined in the Assignment Agreement).

3.

Other documents and evidence

(a)

A copy of the executed Initial Qoros Loan Agreement and evidence that the proceeds of the initial drawdown under this Agreement will be applied to fund the first drawdown under
the Initial Qoros Loan Agreement.

33

 
 
 
 
 
 
 
 
 
 
(b)

(c)

(d)

(e)

A copy of the executed Initial Chery Loan Agreement and evidence or confirmation that an amount equal to the first drawdown amount under this Agreement will be made available
and paid to Qoros under the Initial Chery Loan Agreement simultaneously with, or prior to, the first drawdown under this Agreement.

A copy of the executed Initial LLC Agreement.

A copy of the executed Undertaking Agreement, dated as of the date hereof, between Qoros, the Borrower, Kenon, Wuhu Chery Automobile Investment Co. Ltd., Chery Automobiles
Limited and the Lender.

The Borrower having obtained all required governmental, creditor and partner consents, including appropriate foreign debt quota or other necessary regulatory approvals in connection
with the Finance Documents, the Initial Qoros Loan Agreement and the Qoros Security Agreement.

34

 
SCHEDULE   2
Form   of   Utilisation   Request

To:

ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

From: QUANTUM (2007) LLC

as Borrower

Date:

Dear Sirs,

1.

2.

I refer to the Agreement. This is a Utilisation Request. Words and expressions used in this Request shall have the same meaning as are given to them in the Agreement.

Loan Agreement dated_______ 2016 ( the “Agreement”)

I wish to borrow the Loan on the following terms:

(a)

(b)

(b)

Utilisation Date: [ ● ]

Facility: [A] / [B] / [C]

Amount: USD   [ ● ]

3.

The proceeds of this Loan should be credited to [ account ].

Yours faithfully

Manager of
QUANTUM (2007) LLC

35

 
 
 
 
 
 
 
 
 
 
 
 
ANSONIA HOLDINGS SINGAPORE B.V.
as Lender

By

Name:
Title:

SIGNATURES

36

 
 
 
 
 
 
 
QUANTUM (2007) LLC
as Borrower

By

Name:
Title:

37

 
 
 
 
 
 
 
ANNEXURE B

Form of Additional LLC-Qoros Loan Agreement

 
 
 
This   additional   loan   agreement (hereinafter “ Agreement ”) is entered into on __________ ,   2016   by and between following parties:

Loan Agreement

1. Qoros   Automotive   Co.,   Ltd.,   as   the   borrower   (the   “ Borrower ”),   a   limited   liability   company incorporated and duly existing under the PRC law, with address of No.1, Tongda Road,

Economic Technology   Development   Zone,   Changshu   City,   Jiangsu   Province,   People's   Republic   of   China (“ PRC ”), and

2. Quantum  (2007)  LLC,  as the lender (the “ Lender ”),  a  company  incorporated  under  the  laws  of  the  State  of  Delaware,  the  United  States  of  America,  with  its  legal  address  at  16192  Coastal

Highway, Lewes, Delaware 19958, USA.

(The   Lender   and   the   Borrower   hereinafter also referred to in singular as a “ Party ” and together as the “ Parties ”.)

WHEREAS   Ansonia   Holdings   Singapore   B.V.   (“ Ansonia ”)   has   provided   loans   of   total   amount   up   to USD   50,000,000 to   the   Lender   pursuant   to   a   loan   agreement   dated   22
  April   2016   (such   loan agreement   as   amended   by   an   amendment   letter   dated   27   June   2016,   hereinafter   referred   to   as “ Initial Ansonia Loan Agreement ”) entered into by and
between Ansonia as lender and the Lender as borrower.

WHEREAS   Ansonia   will   provide   a   new   loan   of   total   amount   up   to   USD   25,000,000   to   the   Lender pursuant   to   an   amendment   and   restatement   agreement   dated   on   or  
about   the   date   of   this Agreement further amending and restating the Initial Ansonia Loan Agreement (hereinafter referred to   as   “ Ansonia   Amendment ”)   entered   into   by   and   between  
Ansonia   as   lender   and   the   Lender   as borrower. The Initial Ansonia Loan Agreement as amended and restated by the Ansonia Amendment is hereinafter referred to as the “ Amended Ansonia
Loan Amendment ”.

WHEREAS the Lender holds 50% of the equity interests in the Borrower and Wuhu Chery Automobile Investment   Co.   Ltd.  
  equity interests in the Borrower.

   (“ Wuhu   Chery ”)   holds   another   50%

WHEREAS   Wuhu   Chery   as   principal   under   the   Additional   Wuhu   Chery   Loan   Agreement   (defined below)   is   providing   RMB   150,000,000   loan   in   aggregate   to   the   Borrower  
as   borrower   and   the Industrial   and   Commercial Bank   of   China   Limited, Changshu   Sub-Branch 
 as entrusted bank, with terms that are the same as
those contained in the Initial Wuhu Chery Loan Agreements (defined below).

WHEREAS the  Lender  has  decided  to  provide  an  additional  shareholder  loan  with  the  funds  it  obtains  under  the  Amended  Ansonia  Loan  Agreement  to  the  Borrower  up  to      RMB  150,000,000   
according to the terms and conditions of this Agreement.

NOW, the Parties therefore agree as follows:

Article 1 Definitions and Interpretation

1.1 In this Agreement the following captioned terms shall be defined and interpreted as follows:

“ Additional Wuhu Chery Loan Agreement ” means an additional term loan facility entered into by and between Wuhu Chery as lender, the Borrower as borrower and a PRC bank as entrusted
bank  on  or  after  the  date  of  this  Agreement  with  aggregate  commitments  of  up  to  an  amount  equal  to  the  RMB  150,000,000, for  the  purposes  of  the  Borrower  ordinary  course  working  capital
requirements with terms that are the same as those contained in the Initial Chery Loan Agreements.

1

 
 
 
 
 
 
 
 
   
 
 
 
 
 
“ Ansonia Facility A ” means the term loan facility with an amount of USD 25,000,000 made available to the Lender pursuant to Clause 2.1 of the Initial Ansonia Loan Agreement.

“ Business Day ” means a day (other than a Saturday or Sunday) on which banks are open for general business in London, Singapore and New York City and, in respect of any day on which
payment is to be made under this Agreement, Beijing.

“ Default ” means an Event of Default or any event or circumstance specified in Clause 10 ( Events of  Default ) hereunder which would (with the expiry of a grace period, the giving of notice,
making of any determination or the satisfaction of any other condition) be an Event of Default.

“ Environment ”   means   humans,   animals,   plants   and   all   other   living   organisms   including   the   ecological   systems   of   which   they   form   part   and   the   following   media:

(a) air   (including   air   within   natural   or   man-made   structures,   whether   above   or   below   ground);

(b) water   (including   territorial,   coastal   and   inland   waters,   water   under   or   within   land   and   water in   drains   and   sewers);   and

(c)

land   (including   land   under   water).

“ Environmental   Claim ”   means   any   claim,   proceeding,   formal   notice   or   investigation   by   any   person   in   respect   of   any   Environmental   Law.

“ Environmental   Law ”   means   any   applicable   law   or   regulation   which   relates   to:  

(a)

the   pollution   or   protection   of   the   Environment;

(b)

the   conditions   of   the   workplace;   or

(c)

the   generation,   handling,   storage,   use,   release   or   spillage   of   any   substance

which,   alone   or   in   combination   with   any   other,   is   capable   of   causing   harm   to   the   Environment,   including   any   waste.

“ Environmental Permits ” means any permit and/or other authorisation and/or the filing of any notification, report or assessment required under any Environmental Law for the operation of the
business of any Group Member conducted on or from any of the properties owned or used by any Group Member.

“ Event   of   Default ”   means   any   event   or   circumstancespecifiedas   such   in   Clause   10   ( Events   of Default )   hereunder.

“ Financial Indebtedness ” means any obligation to pay or repay money, present or future, whether actual or contingent, sole or joint and any guarantee or indemnity of any of those obligations.

“ Finance Document ” means this Agreement, the Patent Right Pledge Agreement and/or any other document designated as such by the Lender and the Borrower in writing.

“ Group ”   means   the   Borrower   and   each   its   Subsidiary   for   the   time   being.

2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
“ Group   Member ”   means   any   member   of   the   Group.

“ Initial Wuhu Chery Loan Agreements ” means (i) the loan agreement dated 22 April 2016 between Wuhu Chery and the Borrower; and (ii) the loan agreement dated 27 June 2016 between
Wuhu Chery and the Borrower.

“ Initial   Qoros   Loan   Agreement ”   means   the   loan   agreement   dated   14   April   2016   between   the Lender   and   the   Borrower.  

“ Intellectual   Property ”   means:

(a) any  patents,  trademarks,  service  marks,  designs,  business  names,  copyrights,  database  rights,  design  rights,  domain  names,  moral  rights,  inventions,  confidential  information,  knowhow  and

other intellectual property rights and interests (which may now or in the future subsist), whether registered or unregistered; and

(b)

the benefit of all applications and rights to use any or all of the rights, assets and/or items referred to in paragraph (a) from time to time and which may now or in the future subsist.

“ Legal   Reservations ”   means:

(a)

the  principle  that  equitable  remedies  may  be  granted  or  refused  at  the  discretion  of  a  court  and  the  limitation  of  enforcement  by  laws  relating  to  insolvency,  reorganisation  and  other  laws
generally affecting the rights of creditors;

(b)

the  time  barring  of  claims  under  relevant  legislation,  the  possibility  that  an  undertaking  to  assume  liability  for  or  indemnity  a  person  against  non-payment  of  stamp  duty  may  be  void  and
defences of set-off or counterclaim; and

(c) similar principles, rights and defences under the laws of any applicable jurisdiction.

“ Loan ”   means   a   loan   to   be   made   under   the   Quantum   Facility   or   the   principal   amount   outstanding   for   the   time   being   of   such   loan.

“ Material   Adverse   Effect ”   means   any   event   or   circumstance   which,   taking   into   account   all   relevant   circumstances,   has   a   material   adverse   effect   on:

(a)

the business, assets or financial condition of the Borrower; or

(b)

the ability of the Borrower to perform its payment obligations under the Finance Documents and/or the Wuhu Chery Loan Agreements.

“ Patent Right Pledge Agreement ” means the patent right pledge agreement dated 22 August 2016 and entered into by and between the Borrower as pledgor, the Lender and Wuhu Chery as
pledgees for the purpose of securing all the indebtedness arising out of or in connection with the Initial Qoros Agreement and the Initial Wuhu Chery Loan Agreements.

“ PRC ”   means   the   People's   Republic   of   China   excluding   Taiwan,   Macau   and   Hong   Kong.

“ Qualified Financing ” means a financing pursuant to which a third party investor subscribes (or, in the case of a financing by way of instrument that is convertible into equity, will on conversion
of such instrument subscribe) for an equity interest in the Borrower in an aggregate amount of not less than the Qualified Financing Amount excluding the amount of any conversion of Financial
Indebtedness into equity in the Borrower undertaken pursuant to the terms of the Amended Ansonia Loan Agreement.

3

 
 
 
 
 
 
 
 
 
 
 
 
“ Qualified   Financing   Amount ”   means   USD   100,000,000.

“ Quantum   Facility ”   shall   have   the   meaning   given   to   it   in   Clause   2.1.

“ Qoros   Loan   Agreements ”   means   this   Agreement   and   the   Initial   Qoros   Loan   Agreement.

“ SAFE ”meansthe   StateAdministrationofForeignExchangeofthe   PRCand/oritslocal   counterpart.

“ Security ” means any mortgage, pledge, lien, charge (fixed or floating), assignment, hypothecation, set-off or trust arrangement for the purpose of creating security, reservation of title or security
interest or any other agreement or arrangement having a similar effect.

“ Subsidiary ”   means   in   relation   to   any   company,   corporationor   entity,   a   company,   corporation   or   entity:

(a) which is controlled, directly or indirectly, by the first mentioned company, corporation or entity;

(b) more than half the issued share capital, registered capital or equity interest of which is beneficially owned, directly or indirectly by the first mentioned company, corporation and entity; or

(c) which is a Subsidiary of another Subsidiary of the first mentioned company, corporation or entity,

and for this purpose, a company, corporation or entity shall be treated as being controlled by another if that other company, corporation or entity is able to direct its affairs and/or to control the
majority of the composition of its board of directors or equivalent body.

“ Termination   Date ”   means   25   January   2017.

“ Utilisation   Date ”   means   the   date   on   which   a   Loan   under   the   Quantum   Facility   is   to   be   made   or,   as   the   context   requires,   was   made.

“ Utilisation   Request ”   means   a   notice   substantially   in   the   form   set   out   in   Schedule   2   ( Form   of Utilisation   request )   herein.

“ Wuhu   CheryLoan   Agreements ”means   each   Initial   Wuhu   Chery   Loan   Agreementsand   the Additional   Wuhu   Chery   Loan   Agreement.

1.2 Unless   a   contrary   indication   appears,   any   reference   in   this   Agreement   to:

(a)

the “ Borrower ” or the “ Lender ” shall be construed so as to include its successors in title, heirs, permitted assigns and permitted transferees;

(b) “ assets ” includes present and future properties, revenues and rights of every description;

(c) a “ Finance Document ” or  any other  agreement  or instrument  is  a reference  to  that  Finance  Document  or other  agreement  or instrument  as  amended,  novated,  supplemented,  extended  or

restated;

4

 
 
 
 
 
 
 
 
 
 
 
 
(d) “indebtedness” includes any obligation (whether incurred as principal or as surety) for the payment or repayment of money, whether present or future, actual or contingent;

(e) a “person” includes any person, firm, corporation, government, state or agency of a state or any association, trust or partnership (whether or not having separate legal personality) or two or

more of the foregoing;

(f) a “regulation” includes any regulation, rule, official directive, request or guideline (whether or not having the force of law, but if not having the force of law being one with which it is the
practice of the relevant person to comply) of any governmental, intergovernmental or supranational body, agency, department or regulatory, self-regulatory or other authority or organisation;

(g) a “Clause” or a “Schedule” is a reference to a clause of, or a schedule to, this Agreement;

(h) “$, “USD” and “US dollar” denote the lawful currency of the United States of America;

(i) “RMB” denotes the lawful currency of the People’s Republic of China;

(j)

a provision of law is a reference to that provision as amended or re-enacted; and

(k) a time of day is a reference to Beijing time.

1.3 Unless a contrary indication appears, a term used in any other Finance Document or in any notice given under or in connection with any Finance Document has the same meaning in that Finance

Document or notice as in this Agreement.

1.4 Clause   and   Schedule   headings   are   for   ease   of   reference   only.

1.5 A   Default   or   Event   of   Default   is   “continuing”   if   it   has   not   been   waived   in   writing.

Article   2   Amount   and   Purpose   of   the   Loans   and   Undertaking

2.1 Subject to the terms of this Agreement, the Lender agrees to make available to the Borrower a term loan facility in an aggregate principal amount equivalent of RMB 150,000,000 ( “Quantum

Facility” ).

2.2 As   initial   conditions   precedent   for   the   Lender   to   make   the   Quantum   Facility   available   to   the Borrower:

(a) The Lender has received all of the documents and other documents listed in Schedule 1 ( Conditions Precedent to initial utilisation ) in form and substance satisfactory to the Lender save to the

extent that the Lender has waived receipt of the same;

(b) No Default or Event of Default (or, in case of the Amended Ansonia Loan Agreement, or the Wuhu Chery Loan Agreements, no default or other event of a similar nature or having similar

effect as a Default);

(c) Each of the representations set out in Clause 7 ( Representations and Warranties ) hereunder is true and correct on the date of this Agreement and on the Utilisation Date;

(d)

the   Additional   Wuhu   Chery   Loan   Agreement   (in   the   form   and   substance   satisfactory   to   the Lender)   is   duly   executed   and   delivered   to   the   Lender;   and

5

 
 
 
 
 
 
 
 
(e)

the   Lender   at   its   sole   discretion   has   agreed   and   consented   to   the   advance   of   such   Loan.

2.3 The   Borrower   may   only   borrow   a   Loan   by   giving   the   Lender   a   duly   completed   Utilisation Request.   Unless   the   Lender   otherwise   agrees:

(a) The   latest   time   for   receipt   by   the   Lender   of   such   Utilisation   Request   is   9:30   a.m.   (Beijing Time)   seven   Business   Days   before   the   proposed   Utilisation   Date.

(b) A   Utilisation   Request   for   a   Loan   hereunder   is   irrevocable   and   will   not   be   regarded   as   having   been   duly   completed   unless:

(i)

it   specifies   a   Utilisation   Date   that   is   a   Business   Day;

(ii) the   amount   of   the   Loan   requested   is   a   minimum   of   RMB   500,000   and   if   less,   the   available   commitment   amount   under   the   Quantum   Facility;   and

(iii) the   currency   of   the   Loan   is   RMB.

(c) No   more   than   ten   Loans   may   be   drawn   under   the   Quantum   Facility.

2.4 Subject to satisfaction or waiver of the conditions precedent set out in Clauses 2.2 and 2.3 above, the Lender shall advance a Loan under the Quantum Facility to the Borrower.

2.5 The   Loans   under   this   Agreement   shall   be   used   solely   for   the   purpose   of   meeting   the   working   capital   needs   in   the   ordinary   course   of   the   Borrower.

Article   3   Term   of   the   Loan

3.1 Unless otherwise provided herein, the Term under this Agreement shall commence from the first Utilisation Date of this Agreement and in any event end on the fifth Business Day preceding the

Termination Date (herein referred to as “Term” ).

3.2 The last day of the Term shall be the date on which each Loan hereunder shall be repaid ( “Repayment Date” ). In the event that it is not a Business Day, payment of the Loan and interest payable

on such date will be made on the next succeeding Business Day in the same month (if there is one) or the preceding Business Day (if there is not).

Article   4   Interest   Rate

4.1 The   interest   rate   applicable   to   a   Loan   shall   be   6%   per   annum.

4.2 Interest on a Loan shall accrue from the Utilisation Date for such Loan. All computations of the interest rate shall be based on a 360 day-year for the actual number of days elapsed.

Article   5   Payment   of   Principal   and   Interest

5.1 The Borrower shall repay the Loans hereunder in full together with interest accrued at lump sum on the Repayment Date. The Lender shall issue a loan repayment notice to the Borrower for the

Loans and interest due fifteen days ahead of the Repayment Date.

5.2 The Borrower may not reborrow any part of any Loan hereunder which is repaid or pre-paid.

6

 
 
 
 
 
 
 
5.3 Repayment  of  a  Loan  ahead  of  the  Repayment  Date  by  the  Borrower  (including  the  order  of  application  of  the  repayment  amount)  shall  be  made  after  delivering  a  written  notice  at  least  five

Business Days prior to the proposed prepayment date and shall be subject to a written consent from the Lender.

5.4 If, in any applicable jurisdiction, it becomes unlawful for any party to perform any of its obligations under any of the Amended Ansonia Loan Agreement, the Finance Documents, the Initial Qoros
Loan Agreement or any Wuhu Chery Loan Agreement, the Lender shall promptly notify the Borrower on becoming aware of that event and the Borrower shall within three Business Days repay all
the outstanding indebtedness arising under this Agreement in full.

5.5 The interest on early repaid loan amounts shall be calculated on the basis the interest rate specified in this Agreement and on the actual days elapsed, and it shall be paid on the date when such Loan

is prepaid.

Article   6   Tax   and   other   deductions

6.1 Each   Party   hereto   shall   respectively   pay   all   its   own   present   and   future   taxes   as   may   be   levied   by   a   respective   government   in   relation   to   this   Agreement.

6.2 All sums paid by the Borrower to the Lender in accordance with the terms of this Agreement and required by the Lender shall be free and clear of any other deductions of any nature, including but
not limited to bank charges. The Borrower shall pay an extra amount as necessary in addition to the payment of the said sums so as to ensure that the Lender receives the full amount which it would
have received if no such deduction had been required.

Article   7   Representations   and   warranties

7.1 The   Borrower   makes   the   representations   and   warranties   set   out   in   this   Clause   7   to   the   Lender   on   the   date   of   this   Agreement:

(a)

it is a limited liability company, duly formed and validly existing under the PRC laws, and it has the power to own its assets and carry on its business as it is being conducted;

(b) each of its Subsidiaries is duly formed and validly existing under the jurisdiction of its incorporation, and it has the power to own its assets and carry on its business as it is being conducted;

(c) subject to the Legal Reservations, the obligations expressed to be assumed by it in the Finance Documents are legal, valid, binding and enforceable obligations;

(d)

the   entry   into   and   performance   by   it   of,   and   the   transactions   contemplated   by,   any   Finance Documents   do   not   conflict   with:

(i)

(ii)

any   law   or   regulation   applicable   to   it;   or

its   constitutional   documents;

(e)

it  has  the  power  to  enter  into,  perform  and  deliver,  and  has  taken  all  necessary  action  to  authorise  the  entry  into,  performance  and  delivery  of  the  Finance  Documents  and  the  transactions
contemplated hereunder;

7

 
 
 
 
(f) all   authorisations   required   or   desirable:

(i)

(ii)

to   enable   it   lawfully   to   enter   into,   exercise   its   rights   and   comply   with   its   obligations   in   the   Finance   Documents;

to   make   the   Finance   Documents   admissible   in   evidence   in   its   jurisdiction   of   incorporation;   and

(iii)

for   it   and   each   of   its   Subsidiaries   to   carry   on   its   business,   and   which   are   material,   have   been   obtained   or   effected   and   are   in   full   force   and   effect;

(g) subject   to   the   Legal   Reservations,

(i)

(ii)

(h) no:

(i)

(ii)

the   choice   of   PRC   law   of   the   Finance   Documents   will   be   recognised   and   enforced   in   its   jurisdiction   of   incorporation;   and

any   judgment   obtained   in   relation   to   a   Finance   Document   in   the   PRC   will   be   recognised   and   enforced   in   its   jurisdiction   of   incorporation.

corporate   action,   legal   proceeding   or   other   procedure   or   step   described   in   Clause 10.7;   or

creditors   process   described   in   Clause   10.12,

has   been   taken   or,   to   the   knowledge   of   the   Borrower,   threatened   in   relation   to   it   or   any Group   Member.

(i)

it is not required under the PRC laws to make any deduction or withholding for or on account of tax from any payment it may make under any Finance Document (save for withholding tax
which is liable for it to be withheld and charged over the interest revenue of the Lender under this Agreement);

(j) under the PRC law, it is not necessary that the Finance Documents be filed, recorded or enrolled with any court or other authority in the PRC or that any stamp, registration or similar tax be paid

on or in relation to the Finance Documents or the transactions contemplated by the Finance Documents, save for the stamp duty which shall be payable by it upon execution of this Agreement;

(k) all information supplied by any Group Member to the Lender is true, complete and accurate in all material respects as at the date it was given and is not misleading in any respect;

(l)

each of the Group Members is in compliance with Clause 9.2(c) and to the best of its knowledge and belief (having made due and careful enquiry) no circumstances have occurred which would
prevent such compliance in a manner or to an extent which has or could reasonably be expected to have a Material Adverse Effect, and no Environmental Claim has been commenced or (to the
best  of  its  knowledge  and  belief  (having  made  due  and  careful  enquiry))  is  threatened  against  it  or  any  other  Group  Members  where  that  claim  has  or  could  reasonably  be  expected,  if
determined against it or that Group Member, to have a Material Adverse Effect.

8

 
 
 
 
 
 
(m) it and each Group Member has paid and discharged all taxes imposed upon it or its assets within the time period allowed without incurring penalties except where:

(i)

(ii)

such payment is being contested in good faith;

adequate reserves are being maintained for those taxes and the costs required to contest them; and

(iii)

failure to pay those taxes does not have and could not be reasonably be expected to have a Material Adverse Effect.

and,  no claims  or  investigations  are  being,  or  are  reasonably  likely  to  be,  made  or  conducted  against  it  (or  any  Group Member)  with  respect  to  taxes  which  are  reasonably  likely  to  have  a
Material Adverse Effect.

(n)

it:

(i)

is the sole legal and beneficial owner of or has licensed to it on normal commercial terms all the Intellectual Property which is material in the context of its business and which is

required by it in order to carry on its business as it is being conducted;

(ii)

does not, in carrying on its businesses, infringe any Intellectual Property of any third party in any respect which has or could reasonably be expected to have a Material Adverse Effect;

and

(iii)

has taken all formal or procedural actions (including payment of fees) required to maintain any Intellectual Property owned by it to the extent failure to do so has or could reasonably

be expected to have a Material Adverse Effect.

(o) no Event of Default is continuing or might reasonably be expected to result from the making of any utilisation, and no other event or circumstance is outstanding which constitutes a default

under any other agreement or instrument which is binding on it or any of its Subsidiaries or to which its assets are subject which might have a Material Adverse Effect;

(p)

its  payment  obligations  under  the  Finance  Documents  rank  at  least  pari  passu  with  the  claims  of  all  its  other  unsecured  and  unsubordinated  creditors,  except  for  obligations  mandatorily
preferred by law applying to companies generally; and

(q) no litigation, arbitration or administrative proceedings of or before any court, arbitral body or agency which, if adversely determined, might reasonably be expected to have a Material Adverse

Effect have been started or threatened against it or any its Subsidiary;

(r) any person specified as its authorised signatory under Schedule 1 ( Conditions precedent to initial utilisation ) is authorised to sign the Utilisation Request and other notices on its behalf.

7.2 The above representations are deemed to be made by the Borrower by reference to the facts and circumstances then existing on each Utilisation Date.

Article 8 Information undertakings

8.1 The undertakings in this Clause 8 remain in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

9

 
8.2 The Borrower shall notify the Lender of (i) any Default (and the steps, if any, being taken to remedy it) in the Finance Documents or (ii) any default (and the steps, if any, being taken to remedy it)

in the Wuhu Chery Loan Agreements and any other Financial Indebtedness of Qoros, in each case, promptly upon becoming aware of its occurrence.

8.3 The Borrower shall supply to the Lender:

(a) promptly  upon  becoming  aware  of  them,  the  details  of  any  litigation,  arbitration  or  administrative  proceedings  which  are  current,  threatened  or  pending  against  it,  and  which,  if  adversely

determined, are reasonably likely to have a Material Adverse Effect; and

(b) promptly on request, such further information regarding the financial condition, assets and operations of it as the Lender may reasonably request.

Article 9 General undertakings

9.1 The undertakings in this Clause 9 remain in force from the date of this Agreement for so long as any amount is outstanding under this Agreement.

9.2 The Borrower undertakes that:

(a)

it shall comply in all respects with all laws to which it may be subject, if failure so to comply would impair its ability to perform its obligations under the Finance Documents and/or the Wuhu

Chery Loan Agreements;

(b)

it shall promptly:

(i)

(ii)

obtain, comply with and do all that is necessary to maintain in full force and effect; and

supply   certified   copies   to   the   Lender   of,

any authorisation, approval or consent (including but not limited to the consent from its other creditors under other finance arrangements) required to enable it to enter in to the Patent Right
Pledge Agreement and any amendment or supplement thereto, perform its obligations under the Finance Documents and Wuhu Chery Loan Agreements and to ensure the legality, validity,
enforceability or admissibility in evidence in its jurisdiction of incorporation of any Finance Document and the Wuhu Chery Loan Agreements.

(c)

it shall ensure that each Group Member will:

(i)

(ii)

comply with all Environmental Law;

obtain, maintain and ensure compliance with all requisite Environmental Permits;

(iii)

implement procedures to monitor compliance with and to prevent liability under any Environmental Law, where failure to do so has or could reasonably be expected to have a Material

Adverse Effect;

(d)

it promptly upon becoming aware of the same, inform the Lender in writing of:

(i)

any Environmental Claim against it or any Group Member which is current, pending or threatened; and

10

 
 
 
(ii)

any facts or circumstances which could reasonably be expected to result in any Environmental Claim being commenced or threatened against it or any Group Member,

where the claim, ifdetermined againstthatitor that  Group Member, hasorcould reasonably be expected to have a Material Adverse Effect;

(e)

It shall and it shall ensure that each Group Member pay and discharge all taxes imposed upon it or its assets within the time period allowed without incurring penalties unless and only to the

extent that:

(i)

such payment is being contested in good faith;

(ii)

adequate reserves are being maintained for those taxes and the costs required to contest them in accordance with the applicable accounting principles; and

(iii)

such payment can be lawfully withheld and failure to pay those taxes does not have and could not reasonably be expected to have a MaterialAdverse Effect;

(f)

it shall not and shall ensure no other Group Member will make or agree to make any dividend distribution without the Lender's prior written consent;

(g)

itshall and shall ensure itsGroup Member preserveand maintain the subsistenceand validity of any and all Intellectual Property;

(h) without  prior  written  consent  from  the  Lender,  it  shall  not  create  or  permit  to  subsist  any  security  over  any  of  its  assets  save  for  the  security  created  pursuant  to  the  Patent  Right  Pledge

Agreement;

(i) without prior written consent from the Lender, it shall not enter into a single transaction or a series of transactions (whether related or not) and whether voluntary or involuntary to sell, lease,

transfer or otherwise dispose of 50% or more of its assets;

(j) without prior written consentfrom the Lender, it shall not enter into any amalgamation, demerger, merger, acquisition or corporate reconstruction;

(k) without prior written consent from the Lender, it shall not incur any indebtedness or liability which requires or otherwise is subject to the board approval from the Borrower, except pursuant

to the Finance Documents and the Wuhu Chery Loan Agreements;

(l)

it shall procure that no substantial change is made to the general nature of its business that carried on at the date of this Agreement;

(m) the Borrower shall, upon written request by the Lender, use its best efforts to:

(i)

(ii)

amend the Patent Right Pledge Agreement to the satisfaction of the Lender so that the Patent Right Pledge Agreement secures all present and future moneys, debts and liabilities
due, owing or incurred by the Borrower under or in connection with this Agreement (the “ Patent Right Pledge Agreement Amendments ”); and

take all other action necessary or reasonably required by the Lender to obtain all governmental, regulatory, creditor and partner approvals required in connection with the Patent 
Right  Pledge  Agreement Amendments (including the relevant approvals from the State Intellectual Property Office of the PRC);

11

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(n)

it  shall only amend, repay the Wuhu Chery Loan Agreements subject to a prior written notification by the Borrower to the Lender and written consent by the Lender to such amendment,

repayment and, as the case may be; and

(o)

it shall conduct the performance of the Wuhu Chery Loan Agreements at all times in a fully equal manner with the Qoros Loan Agreements, including but not limited to repayment and/or

prepayment of any amounts of the principal and interest under the Wuhu Chery Loan Agreements and the Qoros Loan Agreements in equal shares and at the same time.

Article 10 Event of Default

10.1 Each of the events or circumstances set out in Clauses 10.2 to 10.14 (inclusive) is an Event of Default.

10.2 The Borrower does not pay on the due date any amount payable pursuant to a Finance Document at the place at and in the currency in which it is expressed to be payable unless:

(a)

its failure to pay is caused by administrative or technical error; and

(b) payment is made within two Business Days of its due date.

10.3 The Borrower does not comply with any provision of this Agreement (other than those referred to in Clause 10.2 and 10.14), however, no Event of Default will occur if the failure to comply is
capable of remedy and is remedied within fifteen Business Days of the earlier of (i) the Lender giving notice to the Borrower and (ii) the Borrower becoming aware of the failure to comply.

10.4 Any representation or statement made or deemed to be made by the Borrower in the Finance Documents and/or any of the Wuhu Chery Loan Agreements is or proves to have been materially
incorrect or materially misleading when made or deemed to be made, however, no Event of Default under will occur if the circumstances giving rise to the misrepresentation or misstatement are
capable of remedy and are remedied within fifteen Business Days upon the Borrower becoming aware of the misrepresentation or misstatement.

10.5 Any Financial Indebtedness of the Borrower:

(a)is not paid when due nor within any originally applicable grace period, unless such non- payment is waived within fifteen BusinessDays of the later of such due date and the applicable grace period; or

(b)

is declared to be or otherwise becomes due and payable prior to its specified maturity as a result of an event of default (however described),

however, no Event of Default will occur hereunder if the aggregate amount of Financial Indebtedness falling within paragraphs (a) or (b) above is less than RMB 50,000,000 (or its equivalent in
any other currency or currencies).

10.6 The Borrower is unable or admits inability to pay its debts as they fall due or is deemed to or declared to be unable to pay its debts under applicable law or, by reason of actual or anticipated
financial  difficulties,  suspends  making  payments  on  any  of  its  debts  or  commences  negotiations  with  one  or  more  of  its  creditors  with  a  view  to  rescheduling  any  of  its
indebtedness(other than with the Lender), or, a moratorium is declaredin respectof any indebtedness of the Borrower.

12

 
 
 
 
 
 
 
 
 
 
 
 
10.7 Any corporate action, legal proceedings or other procedure or step is taken in relation to:

(a)

the suspension of payments, a moratorium of any indebtedness, winding-up, dissolution, administration, provisional supervision or reorganisation (by way of voluntary arrangement, scheme
of arrangement or otherwise) of it;

(b) a composition,assignment or arrangement with any of its creditors;

(c)

the appointment of a liquidator (other than in respect of a solvent liquidation of it, receiver, administrator, administrative receiver, compulsory manager, provisional supervisor or other similar
officer in respect of it or any of its assets;

(d) enforcement of any security over any assets of it; or

(e) any analogous procedure or step is taken in any jurisdiction.

10.8

It is or becomes unlawful for the Borrower to perform any of its obligations under the Finance Documents and/or any of the Wuhu Chery Loan Agreements.

10.9 Subject to the Legal Reservations, any obligation or obligations of the Borrower under the Finance Documents and/or any of the Wuhu Chery Loan Agreements are not or cease to be legal, valid,

binding or enforceable.

10.10 The Finance Documents and/or any of the Wuhu Chery Loan Agreements cease to be in full force and effect.

10.11 The Borrower repudiates a Finance  Document and/or  any of the Wuhu Chery Loan Agreements or evidences an intention to repudiate a Finance Document and/or any of the Wuhu Chery Loan

Agreements.

10.12 The authority or ability of the Borrower to conduct its business is limited or wholly or substantially curtailed by any seizure, expropriation, nationalization, intervention, restriction or other action
by or on behalf of any governmental, regulatory or other authority or other person in relation to it or any of its assets which limitation or curtailment (taking into consideration any compensation
or payment received in respect thereof) has, or is reasonably expected to have, a Material Adverse Effect.

10.13 The Borrower sells, transfers or otherwise disposes of 50% or more of its assets in any single transaction or series of related transactions.

10.14 Any event or circumstanceoccurs which has, or might reasonablybe expectedto have, a Material Adverse Effect.

10.15 On and at any time after the occurrence of an Event of Default which is continuing, the Lender may, by notice to the Borrower:

(a) cancel the Quantum Facilities whereupon the Quantum Facilities shall immediately be cancelled;

(b) declare  that  all  or  part  of  any  Loan  (to  the  extent  not  repaid),  together  with  accrued  and  unpaid  interest,  and  all  other  amounts  accrued  or  outstanding  under  the  Finance  Documents  be

immediately due and payable, whereupon they shall become immediately due and payable; and/or

13

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(c) declare that all or part of any Loan (to the extent not repaid) be payable on demand, whereupon it shall immediately become payable on demand;

(d) exercise any or all of  its rights, remedies, powers or discretions under the Finance Documents.

Article 11 Ansonia Loan Agreement and Wuhu Chery Loan Agreements

11.1 Notwithstanding any other provisions in this Agreement,  if any part or all of the outstanding loans (together  with accrued  and unpaid interest)  under the Initial  Ansonia Loan Agreement,  the
Amended Ansonia Loan Agreement and/or any of the Wuhu Chery Loan Agreements is required to be repaid before its due date for whatever reason (including but not limited to the occurrence of
an event of default thereunder), the Borrower shall be obligated to make immediate prepayment/repayment in the same amount at the same time to the Lender without any delay.

Article 12 Overdue Loan

12.1

In the event of failure by the Borrower to make a scheduled repayment of a Loan, the Lender shall be entitled to penalty interest on the overdue portion of such Loan from the due date at the late
payment penalty interest rate until the principal and interest have been fully repaid by the Borrower to the Lender.

12.2 The late payment penalty interest rate shall be calculated by increasing the prevailing loan interest rate as provided in Clause 4.1 by 120%.

Article 13 Amendment and Supplement

13.1 This  Agreement  may  only  be  amended  or  supplemented  upon  the  written  consent  of  both  Parties.  Any  amendment  and  supplement  to  this  Agreement  shall  constitute  an  integral  part  of  this
Agreement and if so required shall be approved and/or registered (as the case may be) with the locally competent department of SAFE in charge of the Borrower in accordance with the relevant
laws and regulations of the PRC.

13.2 Unless otherwise required by applicable laws and regulation and/or agreed by the Parties hereto, this Agreement shall not be terminated until all the rights and obligations hereunder are fully

performed.

13.3 Unless  otherwise  required  by  applicable  laws  and  regulation  and/or  agreed  by  the  Parties  hereto,  any  invalidity  of  any  provision  of  this  Agreement  shall  not  affect  the  validity  of  the  entire

Agreement.

Article 14 Assignment and Transfer

14.1 This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and permitted assigns and permitted transferees. The Borrower shall not assign or
transfer all or any part of its rights, benefits and obligations hereunder without prior written consent by the Lender. The Lender may assign or transfer any of its rights or obligations under this
Agreement by delivering a written notice to the Borrower.

14

Article 15 Governing Law and Dispute Resolution

15.1 The execution, effectiveness, interpretation, performance and any disputes arising under this Agreement are governed by the law of the PRC.

15.2 Any dispute in connection with this Agreement shall be resolved through friendly negotiation between the Parties. If the dispute is not resolved through negotiation within sixty (60) calendar days
after one Party has served a written notice on the other Party requesting the commencement of negotiation, then the Parties shall refer and submit the dispute for final resolution by arbitration to
the Hong Kong International Arbitration Center (HKIAC) in accordance with the HKIAC Adminstered Arbitration Rules (the “ HKAJC Arbitration Rules ”) as at present in force save as the
same may be amended by this Article and the HKIAC Arbitration Rules shall be construed accordingly. The place of arbitration shall be Hong Kong. The arbitration shall be settled by three (3)
arbitrators. Each Party shall appoint one arbitrator within the time stipulated in the HKIAC Arbitration Rules, failing which the appointment shall be made by HKIAC. The third arbitrator, who
will act as the presiding arbitrator, shall be appointed by the HKIAC. The appointing authority shall be the HKIAC. The language of the arbitration proceedings shall be English, provided that
either Party may introduce evidence or testimony in languages other than English. The award of the arbitration tribunal will be final and binding on each of the Parties and may be enforced, if
necessary,  in  any  court  of  competent  jurisdiction.  The  costs  of  arbitration  including  attorneys'  fees  shall  be  borne  by  the  losing  Party  unless  otherwise  decided  in  the  arbitral  award.  In  any
arbitration  proceeding  or  legal  proceeding  to  enforce  an  arbitral  award,  in  any  other  legal  action  between  the  Parties  relating  to  this  Agreement,  each  Party  waives  the  defense  of  sovereign
immunity and any other defense solely based upon the fact or allegation that it is a political subdivision, agency or instrumentality of a sovereign state.

Article 16 Effectiveness and Termination

16.1 Each notice, demand or other communication hereunder and any other documents required to be delivered hereunder shall be in made in written and in English only.

16.2 This Agreement shall come into force on the date of execution by the Parties. It shall be registered with the locally competent department of SAFE in charge of the Borrower within fifteen (15)

days after this Agreement has been duly executed by both Parties (“ SAFE Registration ”).

16.3 This Agreement shall automatically terminate upon the principal amount of the Loans and other payable amounts hereunder (including but not limited to interest and late payment penalty interest)

have been paid to the Lender in full.

16.4 This Agreement is signed in three original sets and in English language only. In case any Chinese transcript is made hereof for sake of registration with SAFE, the English version shall be the only

binding version. Each of the Parties shall hold one original set and one original set shall be for SAFE registration purposes.

15

 
1.

The Borrower

SCHEDULE 1 
Conditions precedent to initial utilisation

(a)

(b)

(c)

(d)

Copies of the constitutional documents of the Borrower.

A copy of a shareholder resolution or resolution of the board of directors (as the Lender may require pursuant to the currently effective articles of association) of the Borrower:

(i)

approving the terms of, and the transactions contemplated by, the Finance Documents to which it is a party and resolving that it execute the Finance Documents to which it is
a party;

(ii)

authorising a specified person or persons to execute the Finance Documents to which it is a party on its behalf; and

(iii)

authorising a specified person or persons, on its behalf, to sign and/or dispatch all documents and notices to be signed and/or dispatched by it under or in connection with the
Finance Documents to which it is a party.

A specimen of the signature of each person authorised by the resolution referred to in paragraph (b) above.

A certificate of an authorised signatory of the Borrower certifying that each copy document relating to it specified in this Paragraph 1 of Schedule 1 is correct, complete and in full
force and effect as at a date no earlier than 3 Business Days prior to the date of this Agreement.

2.

3.

Finance Documents

(a)

This Agreement duly executed by the Parties.

Other documents and evidence

(a)

(b)

(c)

(d)

A copy of the executed Ansonia Amendment.

A copy of the executed Chery Loan Agreement.

The confirmation letter issued by Wuhu Chery that all of the conditions precedents for Wuhu Chery to make available the loan facility to the Borrower under the Additional Wuhu
Chery Loan Agreement have been satisfied (or waived) and an amount equal to the utilisation amount under this Agreement will be made available and paid to the Borrower under the
Additional Wuhu Chery Loan Agreement before or at the same time as the utilisation under this Agreement.

The confirmation letter has been issued by Ansonia confirming that all of the conditions precedents for Ansonia to make available the loan facility to the Lender under the Amended
Ansonia Loan Agreement have been satisfied (or waived) and an amount equal to the drawdown amount under this Agreement will be made available and paid to the Lender under the
Amended Ansonia Loan Agreement no later than the proposed Utilisation Date hereunder.

16

 
 
(e)

(f)

The Borrower, the Lender, Kenon Holdings Ltd., Wuhu Chery, Chery Automobile Co., Ltd. and Ansonia have entered into an undertaking agreement, pursuant to which, Wuhu Chery
undertakes to provide financing to the Borrower pursuant to the Wuhu Chery Loan Agreements.

All required governmental consent in connection with the Finance Documents and the Wuhu Chery Loan Agreements, including but not limited to evidence regarding completion of
the SAFE Registration of this Agreement.

17

SCHEDULE 2 
Form of Utilisation Request

To:

QUANTUM (2007) LLC 
as Lender

From: Qoros Automotive Co., Ltd. 

as Borrower

Date:

Dear Sirs,

1.

2.

We, Qoros Automotive Co., Ltd., refer to the Agreement. This is a Utilisation Request. Words and expressions used in this Request shall have the same meaning as are given to them in the
Agreement.

Loan Agreement dated _____ 2016 (the “Agreement”)

We wish to borrow the Loan on the following terms:

(a)

(b)

Utilisation Date: [                           ]

Amount: RMB [                           ]

3.

The proceeds of this Loan should be credited to [ account ].

Yours faithfully

Authorized Signatory of 
Qoros Automotive Co., Ltd.

18

 
 
 
 
Borrower: QOROS AUTOMOTJVE CO., LTD.

Authorized Signatory: ____________________________________________________

Company Seal

(PAGE FOR SIGNATURE)

19

 
Lender:           Quantum (2007) LLC

By:  
Name:
Title:

(PAGE FOR SIGNATURE)

20

 
 
 
 
 
  ANNEXURE C

Form of Additional Wuhu Chery-Qoros Loan Agreement

 
QOROS AUTOMOTIVE CO., LTD.

SIGNATURES

Authorized Signatory
Name:
Company Seal:

QUANTUM (2007) LLC

By

Name:

Title:

KENON HOLDINGS LTD.

By

Name:

Title:

 
  
 
 
 
 
 
    
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SIGNATURES

QOROS AUTOMOTIVE CO., LTD.

Authorized Signatory 

Name: 

Company Seal: 

QUANTUM (2007) LLC

By

Name:

Title:

KENON HOLDINGS LTD.

By

Name:          Yoav Doppelt

Title:            CEO

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
SIGNATURES

QOROS AUTOMOTIVE CO., LTD.

Authorized Signatory

Name:

Company Seal:

QUANTUM (2007) LLC

By

Name:         ROBERT ROSEN

Title ::        MANAGER

KENON HOLDINGS LTD.

By

Name:

Title:

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
WUHU CHERY AUTOMOBILE INVESTMENT CO. LTD.

Authorized Signatory

Name:          Company Seal:

CHERY AUTOMOBILE LIMITED

Authorized Signatory

Name:

Company Seal:

 
 
 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ANSONIA HOLDING SINGAPORE B.V.

By

Name:     Chen Tou Sin David

Title:       Director

 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
          
FOURTH AMENDED AND RESTATED

LIMITED LIABILITY COMPANY AGREEMENT

OF

Quantum (2007) LLC

Exhibit 4.20

This Fourth Amended and Restated Limited Liability Company Agreement (this “ Agreement ” ) of Quantum (2007) LLC (the “ Company ” ) is entered into this 2 nd day of

September August 2016, by and between Robert Rosen, (the “ Manager ” ), Kenon Holdings Ltd. (the “ Class A Member ”), and Ansonia Holdings Singapore B.V. (the “ Class B Member ” and,
together with the Class A Member, the “ Members ”), pursuant to and in accordance with the Delaware Limited Liability Company Act (6 Del.C. § 18-101, et   seq. ), as amended from time to time (the
“ Act ” ), and amends and restates that certain Third Amended and Restated Limited Liability Company Agreement entered into on June 28, 2016 between the Manager and the Members (the “ Original
LLC Agreement ”) .

RECITALS

WHEREAS, pursuant  to that  certain  Loan Agreement  entered  into on April  22, 2016 between  the Company, as borrower,  and the  Class B Member,  as lender,  as amended  by that
certain Amendment Letter entered into on June 27, 2016 between the Company and the Class B Member (the “ Loan Agreement ”) , the Class B Member agreed to provide loans in an aggregate amount
of up to $50 million to the Company;

Amendment and Restatement Letter ” );

WHEREAS, the Company and the Class B Member desire to execute an Amendment and Restatement Agreement relating to the Loan Agreement, dated as of the date hereof (the “

WHEREAS, pursuant to the Company’s and the Class B Member’s execution of the Amendment and Restatement Letter, the Company and the Class B Member desire to amend and

restate the Loan Agreement ( the “ Amended and Restated Loan Agreement ”); and

restate the Original LLC Agreement in its entirety.

WHEREAS, in connection with the Company’s and the Class B Member’s execution of the Amendment and Restatement Letter, the Members and the Manager desire to amend and

NOW THEREFORE, in consideration of the mutual covenants and agreements set forth in this Agreement, and for other good and valuable consideration, the receipt and sufficiency of

which are hereby acknowledged, the Members and the Manager, by execution of this Agreement, hereby agree to amend and restate the Original LLC Agreement in its entirety as follows:

1.            Name . The name of the limited liability company governed hereby is Quantum (2007) LLC.

2.            Certificates . A certificate of formation for the Company (the “ Certificate of Formation ” ) has been filed in the Office of the Secretary of State of the State of Delaware in

conformity with the Act. The Manager or an Officer (as hereinafter defined)shall execute, deliver and file any other certificates (and any amendments and/or restatements thereof) necessary for the
Company to continue to qualify to do business in a jurisdiction in which the Company may wish to conduct business.

 
 
 
 
 
3.            Purpose . The Company is formed for the object and purpose of, and the nature of the business to be conducted and promoted by the Company is, engaging in all lawful

activities for which limited liability companies may be formed under the Act.

4.            Powers . The Company shall have the power to do any and all acts reasonably necessary, appropriate, proper, advisable, incidental or convenient to or for the furtherance of

the purpose and business described herein and for the protection and benefit of the Company, and shall have, without limitation, any and all of the powers that may be exercised on behalf of the
Company by the Manager pursuant to this Agreement, including Section 18.

places as may hereafter be determined by the Manager.

5.            Principal Business Office . The principal place of business and office of the Company shall be located at, and the Company ’ s business shall be conducted from, such place or

6.            Registered Office . The address of the registered office of the Company in the State of Delaware is 16192 Coastal Highway, Lewes, Delaware 19958, in the county of Sussex.

7.            Registered Agent . The names and addresses of the registered agents of the Company for service of process on the Company in the State of Delaware are Harvard Business
Services Inc., 16192 Coastal Highway, Lewes, Delaware 19958, in the county of Sussex and National Corporate Research, Ltd., 615 South DuPont Highway, County of Kent, Dover, Delaware 19901.

8.            Members . The names and the mailing addresses of the Members are as follows:

Name

Kenon Holdings Ltd.

Address

1 Temasek Avenue #36-01

Millenia Tower

Singapore 039192

Ansonia Holdings Singapore B.V.

1 Temasek Avenue #38-01

Millenia Tower

Singapore 039192

dissolution of the Company in accordance with Section 24 of this Agreement.

9.            Term . The term of the Company commenced on the date of filing of the Certificate of Formation of the Company in accordance with the Act and shall continue until

2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10.            Limited Liability . Except as otherwise provided by the Act, the debts, obligations and liabilities of the Company, whether arising in contract, tort or otherwise, shall be
solely the debts, obligations and liabilities of the Company, and none of the Members, the Manager, any Officer, employee or agent of the Company (including a person having more than one such
capacity) shall be obligated personally for any such debt, obligation or liability of the Company solely by reason of acting in such capacity.

11.            Capital Structure .

). The Class A Member shall own all of the Class A Interests issued and outstanding and the Class B Member shall own all of the Class B Interests issued and outstanding; provided that, in accordance
with Schedule B attached hereto:

a.            Interests . The capital structure of the Company shall consist of two classes of interests, the Class A Interests and the Class B Interests (collectively, the “ Interests ”

(i)

(ii)

(iii)

(iv)

(v)

if applicable, following the Facility A Repayment Time (as defined in Schedule B ), all Facility A Class B Conversion Interests (as defined in Schedule B ) then held by the
Class B Member (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed
cancelled;

if applicable, following the Facility B Repayment Time (as defined in Schedule B ), all Facility B Class B Conversion Interests (as defined in Schedule B ) then held by the
Class B Member (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed
cancelled;

if applicable, following the Facility C Repayment Time (as defined in Schedule B ), all Facility C Class B Conversion Interests (as defined in Schedule B ) then held by the
Class B Member (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed
cancelled;

if applicable, following the Repayment Time (as defined in Schedule B ), all Class B Interests then held by the Class B Member (including any rights attaching thereto) shall,
by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled;

if applicable, following the Facility A Class B Conversion Time (as defined in Schedule B ), all Facility A Class B Conversion Interests (as defined in Schedule B ) then held
by the Class B Member (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be
automatically converted into Class A Interests;

3

(vi)

(vii)

if applicable, following the Facility B Class B Conversion Time (as defined in Schedule B ), all Facility B Class B Conversion Interests then held by the Class B Member
(including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be automatically converted
into Class A Interests;

if applicable, following the Facility C Class B Conversion Time (as defined in Schedule B ), all Facility C Class B Conversion Interests then held by the Class B Member
(including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be automatically converted
into Class A Interests; and

(viii)

if applicable, following the Qoros Conversion Time (as defined in Schedule B ), all Class A Interests then held by the Class B Member (including any rights attaching thereto)
shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled.

b.            Rights . Each class of Interests shall have the rights and privileges accorded such class as are set forth in this Agreement.

12.            Rights and Duties Attached to the Interests .

Members.

a.            Class A Interest Rights . Each Class A Interest shall rank pari passu with every other Class A Interest and shall entitle its owner to one vote at any meeting of the

forth in Schedule B , attached hereto and made part hereof, until the Class B Interests have been converted and /or cancelled in accordance with the terms set forth in Schedule B .

b.            Class B Interest Rights . Each Class B Interest shall rank pari passu with every other Class B Interest and shall entitle its owner to the rights, powers and duties set

13.            Additional Capital Contributions . The Members are not required to make additional capital contributions to the Company.

14.            Capital Accounts . Separate capital accounts shall be maintained for each Member on the books of the Company. Each capital account shall be adjusted to reflect such

Member ’ s shares of allocations and distributions as provided in Section 15 of this Agreement, and any additional capital contributions to the Company or withdrawals of capital from the Company.
Such capital accounts shall further be adjusted to conform to the Treasury Regulations under Section 704(b) of the Internal Revenue Code of 1986, as amended (the “ Code ” ), as interpreted in good
faith by the Manager.

15.            Allocations and Distributions .

a.            Allocations of Profit and Loss . Subject to Section 16 of this Agreement, all items of income, gain, loss, deduction and credit shall be allocated to the Class A

Member; provided that, following the Facility A Class B Conversion Time and, if applicable, the Facility B Class B Conversion Time and the Facility C Class B Conversion Time, and the conversion of
Class B Interests then held by the Class B Member into Class A Interests in accordance with the conversion mechanisms set forth in Schedule B, and until the Qoros Conversion Time, all items of
income, gain, loss, deduction and credit shall be allocated among the Members in accordance with their Class A Percentage Interests (as indicated on Schedule A attached hereto, which schedule shall be
adjusted from time to time in accordance with Clause 7 of the Amended and Restated Loan Agreement).

4

 
b.            Distributions . Subject to Section 16 of this Agreement, distributions shall be made to the Class A Member at such times and in such amounts as may be determined
in the sole discretion of the Manager; provided that, following the Facility A Class B Conversion Time and, if applicable, the Facility B Class B Conversion Time and the Facility C Class B Conversion
Time, and the conversion of Class B Interests then held by the Class B Member into Class A Interests in accordance with the conversion mechanisms set forth in Schedule B , and until the Qoros
Conversion Time, all distributions shall be shared among the Members in accordance with their Class A Percentage Interests (as indicated on Schedule A attached hereto, which schedule shall be
adjusted from time to time in accordance with Clause 7 of the Amended and Restated Loan Agreement). Notwithstanding any provision to the contrary contained in this Agreement, the Company shall
not make a distribution to any Member on account of their interest in the Company if such distribution would violate Section 18-607 of the Act or other applicable law.

16.            Secondary Sale . The Members and the Manager acknowledge and agree that on any sale, lease, transfer or other disposal by the Company of any asset, including all or a

portion of its legal or beneficial interests in Qoros Automotive Co., Ltd. ( “ Qoros ” ) , the Company shall be required to use any net proceeds from such sale, lease, transfer or disposal (the   “ Transfer
Proceeds ”) as follows:

interest, under the Amended and Restated Loan Agreement prior to using the Transfer Proceeds for any other purpose; and

a.            if prior to the completion of the Class B Conversions (as defined in Schedule B ), for the repayment of the outstanding amount, together with accrued and unpaid

b.            if following the completion of the Class B Conversions, but prior to the Qoros Conversion (as defined in Schedule B ), for the redemption of Class A Interests, at the

then implied value of the Class A Interests (based upon the implied value of the   Company’s   interest   in   Qoros) , prior to using the Transfer Proceeds for any other purpose, with such redemption to
be reflected in an adjustment to Schedule A and the number of Class A Interests, if any, then held by the Class B Member after such redemption.

17.            Management . In accordance with Section 18-402 of the Act, and subject to the rights, powers and duties set forth in Schedule B :

a.            management of the Company shall be vested in the Manager. The Manager shall have the power to do any and all acts necessary, convenient or incidental to or for

the furtherance of the purposes described herein, including all powers, statutory or otherwise, possessed by managers of a limited liability company under the laws of the State of Delaware and including
all things necessary to carry out the terms and provisions of this Agreement. The Manager has the authority to bind the Company;

and obligations under this Agreement and may appoint, contract or otherwise deal with any person to perform any acts or services for the Company as the Manager may reasonably determine;

b.            subject to the rights and powers of the Manager and the limitations thereon contained herein, the Manager may delegate to any person any or all of his powers, rights

5

granted to it by the terms of this Agreement, or those conferred on it by law;

c.            no Member shall participate in the management or control of the business of, or shall have any rights or powers with respect to, the Company except those expressly

shall appoint a new manager; and

d.          the Manager shall hold office until the earliest to occur of its resignation, termination, dissolution or other inability to act in such capacity, at which time the Members

e.            the Manager shall not be compensated for its services as the manager of the Company without the consent of the Members.

18.            Officers . The Manager may, from time to time as it deems advisable, appoint officers of the Company (the “ Officers ” ) and assign in writing titles (including, without

limitation, President, Vice President, Secretary and Treasurer) to any such person. Unless the Manager decides otherwise, if the title is one commonly used for officers of a business corporation formed
under the Delaware General Corporation Law, the assignment of such title shall constitute the delegation to such person of the authorities and duties that are normally associated with that office. Any
delegation pursuant to this Section 18 may be revoked at any time by the Manager.

19.            Other Business . The Manager and the Members may engage in or possess an interest in other business ventures (unconnected with the Company) of every kind and

description, independently or with others. The Company shall not have any rights in or to such independent ventures or the income or profits therefrom by virtue of this Agreement.

20.            Exculpation and Indemnification . None of the Members, the Manager or Officers (each an “ Indemnified Party ” ) shall be liable to the Company or any other person or

entity who has an interest in the Company for any loss, damage or claim incurred by reason of any act or omission performed or omitted by such Indemnified Party in good faith on behalf of the
Company and in a manner reasonably believed to be within the scope of the authority conferred on such Indemnified Party by this Agreement, except that an Indemnified Party shall be liable for any
such loss, damage or claim incurred by reason of such Indemnified Party ’ s gross negligence or willful misconduct. To the full extent permitted by applicable law, an Indemnified Party shall be entitled
to indemnification from the Company for any loss, damage or claim incurred by such Indemnified Party by reason of any act or omission performed or omitted by such Indemnified Party in good faith
on behalf of the Company and in a manner reasonably believed to be within the scope of the authority conferred on such Indemnified Party by this Agreement, except that no Indemnified Party shall be
entitled to be indemnified in respect of any loss, damage or claim incurred by such Indemnified Party by reason of gross negligence or willful misconduct with respect to such acts or omissions; provided
,   however , that any indemnity under this Section 20 shall be provided out of and to the extent of Company assets only, and neither the Manager nor any Member shall have personal liability on account
thereof.

21.            Admission of Additional Members . One (1) or more additional members of the Company may be admitted to the Company with the prior written consent of the Members.

6

22.            Termination of Membership . Subject to Section 24, the termination, dissolution, death, bankruptcy or adjudicated incompetency of a Member shall not cause a dissolution of

the Company, but the rights of such Member to share in the allocations and distributions, to assign its Interests in the Company pursuant to Section 23 and to vote on any matter on which the Members
have the right to vote shall, on the happening of such an event, devolve on its legal representative for the purpose of settling its estate or administering its property.

23.            Assignments . A Member may not transfer, assign, pledge or hypothecate, in whole or in part, its Interests without the prior written consent of the Manager which shall not

be unreasonably withheld.

24.            Dissolution and Winding Up .

Manager, (ii) the death, disability, bankruptcy or withdrawal of the last remaining Member and (iii) the entry of a decree of judicial dissolution under Section 18-802 of the Act.

a.            Dissolution . The Company shall dissolve, and its affairs shall be wound up upon the first to occur of the following: (i) the written consent of the Members and the

Company in an orderly manner).

b.            Winding Up . In the event of dissolution, the Company shall conduct only such activities as are necessary to wind up its affairs (including the sale of the assets of the

25.            Elections . The Manager shall determine the accounting methods and conventions under the tax laws of any and all applicable jurisdictions as to the treatment of income,
gain, loss, deduction and credit of the Company or any other method or procedure related to the preparation of such tax returns. The Manager may cause the Company to make or refrain from making
any and all elections permitted by such tax laws, and the Manager shall not be liable for any consequences to any previously admitted or subsequently admitted Members resulting from their making or
failing to make any such elections.

26.            Separability of Provisions . Each provision of this Agreement shall be considered separable and if for any reason any provision or provisions herein are determined to be

invalid, unenforceable or illegal under any existing or future law, such invalidity, unenforceability or illegality shall not impair the operation of or affect those portions of this Agreement which are valid,
enforceable and legal.

27.            Counterparts . This Agreement may be executed in any number of counterparts, each of which shall be deemed an original of this Agreement.

28.            Entire Agreement . This Agreement constitutes the entire agreement of the Members and the Manager with respect to the subject matter hereof.

29.            Governing Law . This Agreement shall be governed by, and construed under, the laws of the State of Delaware (without regard to conflict of laws principles thereof), and all

rights and remedies shall be governed by such laws.

the Manager.

30.            Amendments . This Agreement may not be modified, altered, supplemented or amended except pursuant to a written agreement executed and delivered by the Members and

7

IN WITNESS WHEREOF, the undersigned, intending to be legally bound hereby, have duly executed this Agreement as of the date first written abo v e

MANAGER: Robert Rosen

By:

Name: Robert Rosen

CLASS A MEMBER: Kenan Holdings Ltd.

By:

Name:
Title

CLASS B MEMBER:  Ansonia Holdings  Singapore B.V.

By:

Name: Chen Tou Sin David
Title    Director

[ S i g n atu r e P age – Fo u rt h Ame n ded an d R estated L L C A gree m e nt]

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IN WITNESS WHEREOF, the undersigned, intending to be legally bound hereby, have duly executed this Agreement as of the date first written above

MANAGER: Robert Rosen

By:

Name: Robert Rosen

CLASS A MEMBER: Kenon Holdings Ltd.

By:

Name: Yoav Doppelt
Title    CEO

CLASS B MEMBER: Ansonia Holdings Singapore B.V.

By:

Name:
Title

[ S i g n atu r e P age – Fo u rt h Ame n ded an d R estated L L C A gree m e nt] 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IN WITNESS WHEREOF, the undersigned, intending to be legally bound hereby, have duly executed this Agreement as of the date first written a bove

MANAGER: Robert Rosen

By:

Name: Robert Rosen

CLASS A MEMBER: Kenon Holdings Ltd.

By:

Name:
Title

CLASS B MEMBER: Ansonia H oldings Singapore B.V.

By:

Name:
Title

[ S i g n atu r e P age – Fo u rt h Ame n ded an d R estated L L C A gree m e nt]

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SCHEDULE A

( as of  September 2 , 2016 )

Name

Capital Contribution

Interest

Kenon Holdings
Ltd.

Ansonia Holdings
Singapore B.V.

$100

N/A

1,000 Class A
Interests

15 Class B
Interests

Percentage
Interest

100% of Class A
Interests

100% of Class B
Interests

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SCHEDULE B

Terms of Class B Interests

(as of  September 2 , 2016 )

Capitalized terms used in this Schedule B and not otherwise defined herein shall have the meanings assigned in this Agreement.

A.            The approval of holders of a majority of the outstanding Class B Interests shall be required for the Company to:

(i) enter into any agreements or consummate any transaction or series of related transactions that would change the Company ’ s business or result in the acquisition or disposition of

investments by the Company;

(ii) amend the terms of, or provide waivers or consents in respect of, the Loan Agreement, dated as of April 22, 2016, between the Company and Qoros, as amended by that certain

Amendment Letter, dated as of June 22, 2016 between the Company and Qoros (the “ Initial Qoros Loan ” );

time   (the   “ Additional Qoros Loan ”   and,   together   with   the   Initial   Qoros   Loan,   the   “ Qoros Loans ”);

(iii) amend the terms of, or provide waivers or consents in respect of, the Loan Agreement, dated as of the date hereof, between the Company and Qoros, as amended from time   to  

(iv) utilize the proceeds derived from the Amended and Restated Loan Agreement for purposes other than the funding of the Qoros Loans; it being understood that the Qoros Loans are

intended to be used by Qoros for its ordinary course working capital;

(v) sell, transfer, otherwise dispose of, or enforce the Company ’ s rights relating to security interests held by the Company, including the Company ’ s security interest in certain assets

of Qoros, as reflected in the Qoros Security Agreement (as defined in the Amended and Restated Loan Agreement);

the Qoros Loans, or the Company, including amending the terms of the Class B Interests or this Agreement, that may materially and adversely affect the rights or interests of the Class B Member; and

(vi) enter into any agreements, consummate any transaction or series of related transactions, or take any action in connection with the approval of any indebtedness or liability at Qoros,

(vii) issue any class of Interests, or securities convertible into a class of Interests, that ranks senior or pari passu to the Class B Interests with respect to receipt of distributions or upon

liquidation. For the avoidance of doubt, the Percentage Interests of the Class B Member set forth in Schedule A shall not be diluted without   the   Class   B   Member’s consent, provided such Percentage
Interests shall be adjusted, as applicable, in accordance with the redemption provisions set forth in Section 16 of this Agreement and the conversion formulation set forth in Clause 7 of the Amended and
Restated Loan Agreement at the Facility A Class B Conversion Time (as defined below) and, if applicable, the Facility B Class B Conversion Time and the Facility C Class B Conversion Time (each as
defined below).

B.          Repayment Cancellations. If applicable, following the repayment (or deemed repayment) of all amounts owed by the Company under the Facility A Loan (as defined in the

Amended and Restated Loan Agreement) in accordance with Clause 5.3 of the Amended and Restated Loan Agreement (the “ Facility A Repayment Time ”), the Class B Interests determined in
accordance with the formulation set forth in Clause 7(a)(i)(A) of the Amended and Restated Loan Agreement (the “ Facility A Class B Conversion Interests ”) held by the Class B Member
immediately prior to the Facility A Repayment Time (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be
deemed cancelled and Schedule A shall be adjusted to reflect the cancellation of the Class B Member’s Facility A Class B Conversion Interests.

If applicable, following the repayment (or deemed repayment) of all amounts owed by the Company under the Facility B Loan (as defined in the Amended and Restated Loan Agreement) in
accordance with Clause 5.3 or Clause 5.6 and Clause 7(a)(ii)(B) of the Amended and Restated Loan Agreement (the “ Facility B Repayment Time ”), the Class B Interests determined in accordance
with the formulation set forth in Clause 7(a)(ii)(A) of the Amended and Restated Loan Agreement (the “ Facility B Class B Conversion Interests ”) held by the Class B Member immediately prior to
the Facility B Repayment Time (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled and
Schedule A shall be adjusted to reflect the cancellation of the Class B Member’s Facility B Class B Conversion Interests.

If applicable, following the repayment (or deemed repayment) of all amounts owed by the Company under the Facility C Loan (as defined in the Amended and Restated Loan Agreement) in
accordance with Clause 5.3 or Clause 5.6 and Clause 7(a)(iii)(B) of the Amended and Restated Loan Agreement (the “ Facility C Repayment Time ”), the Class B Interests determined in accordance
with the formulation set forth in Clause 7(a)(iii)(A) of the Amended and Restated Loan Agreement (the “ Facility C Class B Conversion Interests ”) held by the Class B Member immediately prior to
the Facility C Repayment Time (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled and
Schedule A shall be adjusted to reflect the cancellation of the Class B Member’s Facility C Class B Conversion Interests.

Following the repayment (or deemed repayment) of all amounts owed by the Company under the Amended and Restated Loan Agreement in accordance with Clause 5.6 of the Amended and

Restated Loan   Agreement   (the   “ Repayment Time ”),   the   Class   B Interests held by the Class B Member immediately prior to the Repayment Time (including any rights attaching thereto) shall,
by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled and Schedule A shall be adjusted to ref lect   the   cancellation   of   the   Class  
B   Member’s   Class   B Interests.

 
 
C.          Class B Conversions . Upon completion of an equity financing (or financing by way of instrument that is convertible into equity) pursuant to which a third party investor

subscribes (or, in the case of a financing by way of instrument that is convertible into equity, will on conversion of such instrument subscribe) for an equity interest in Qoros in an aggregate amount not
less than the Qualified Financing Amount (as defined in the Amended and Restated Loan Agreement), excluding any amount attributable to the issuance of Class A Interests in connection with the
Facility A Class B Conversion, the Facility B Class B Conversion or the Facility C Class B Conversion (each as defined below), and other than a transaction pursuant to which all amounts owed by the
Company under the Amended and Restated Loan Agreement are (or are deemed to be) repaid (a “ Qualified Financing ”), the Class B Interests determined in accordance with the formulation set forth
in Clause 7(a)(i) of the Amended and Restated Loan Agreement (the “ Facility A Class B Conversion Interests ”) shall automatically convert into Class A Interests (the “ Facility A Class B
Conversion ”) based on the principal, together with all accrued but unpaid interest, outstanding under the Facility A Loan (as defined in the Amended and Restated Loan Agreement), in accordance with
the Class B conversion formulation set forth in Clause 7(a)(i) of the Amended and Restated Loan Agreement. 

Pursuant to the terms set forth in Clause 7(a)(ii)(A) of the Amended and Restated Loan Agreement, the Class B Member may submit a Facility B Conversion/Repayment Notice (as defined in

the Amended and Restated Loan Agreement) requesting that the Facility B Class B Conversion Interests convert into Class A Interests. If either (i) the Class B Member has submitted a Facility B
Conversion/Repayment Notice making such an election for conversion under Clause 7(a)(ii)(A) of the Amended and Restated Loan Agreement and the Class B Member has not submitted a Further
Facility Conversion/Repayment Notice (as defined in the Amended and Restated Loan Agreement) to change its election, (ii) the Class B Member has submitted a Facility B Conversion/Repayment
Notice electing repayment of the Facility B Loan and the Class B Member has submitted a Further Facility Conversion/Repayment Notice to change its election, or (iii) the Class B Member has
submitted a Facility B Conversion/Repayment Notice electing repayment of the Facility B Loan and, pursuant to the terms set forth in Clause 7(d) of the Amended and Restated Loan Agreement, has
also submitted a Facility Conversion Notice (as defined in the Amended and Restated Loan Agreement), then, in the case of (i) and(ii) of this paragraph, upon the completion of a Qualified Financing or,
in the case of (iii) of this paragraph, promptly after the Company’s receipt of the Facility Conversion Notice, the Facility B Class B Conversion Interests shall automatically convert into Class A Interests
(the “ Facility B Class B Conversion ”) based on the principal, together with all accrued but unpaid interest, outstanding under the Facility B Loan, in accordance with the Class B conversion
formulation set forth in Clause 7(a)(ii)(A) of the Amended and Restated Loan Agreement.

Additionally, pursuant to the terms set forth in Clause 7(a)(iii)(A) of the Amended and Restated Loan Agreement, the Class B Member may submit a Facility C Conversion/Repayment Notice

(as defined in the Amended and Restated Loan Agreement) requesting that the Facility C Class B Conversion Interests convert into Class A Interests. If either (i) the Class B Member has submitted a
Facility C Conversion/Repayment Notice making such an election for conversion under Clause 7(a)(iii)(A) of the Amended and Restated Loan Agreement and the Class B Member has not submitted a
Further Facility Conversion/Repayment Notice to change its election, (ii) the Class B Member has submitted a Facility C Conversion/Repayment Notice electing repayment of the Facility C Loan and
the Class B Member has submitted a Further Facility Conversion/Repayment Notice to change its election, or (iii) the Class B Member has submitted a Facility C Conversion/Repayment Notice electing
repayment of the Facility C Loan and, pursuant to the terms set forth in Clause 7(d) of the Amended and Restated Loan Agreement, has also submitted a Facility Conversion Notice, then, in the case of
(i) and(ii) of this paragraph, upon the completion of a Qualified Financing or, in the case of (iii) of this paragraph, promptly after the Company’s receipt of the Facility Conversion Notice, the Facility C
Class B Conversion Interests shall automatically convert into Class A Interests (the “ Facility C Class B Conversion ” and, together with the Facility A Class B Conversion and the Facility B Class B
Conversion, the “ Class B Conversions ”) based on the principal, together with all accrued but unpaid interest, outstanding under the Facility C Loan, in accordance with the Class B conversion
formulation set forth in Clause 7(a)(iii)(A) of the Amended and Restated Loan Agreement.

 
At the time at which the Facility A Class B Conversion becomes effective (the “ Facility A Class B Conversion Time ”) and, if applicable, the Facility B Class B Conversion becomes effective

(the   “ Facility B Class B Conversion Time ”)   and   the   Facility C Class B Conversion becomes effective (the “ Facility C Class B Conversion Time ”) , all Class B Interests which are the subject
of such conversion (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled and be
automatically converted into Class A Interests, which Class A Interests shall be deemed to be issued by the Company as of the Facility A Class B Conversion Time, the Facility B Class B Conversion
Time, or the Facility C Class B Conversion Time, as applicable, and Schedule A shall be adjusted to reflect the Class   B   Member’s   percentage   of   Class   A   Interests . For the avoidance of doubt,
the Class B Conversions shall be deemed complete upon the later of the Facility A Class B Conversion Time and, if applicable, the Facility B Class B Conversion Time and the Facility C Class B
Conversion Time.

Notwithstanding the aforementioned if, upon completion of a Qualified Financing, the outstanding amount owed under the Amended and Restated Loan Agreement is repaid in full, there shall

be no Class B Conversions and the Class B Interests held by the Class B Member immediately prior to the Qualified Financing (including any rights attaching thereto) shall, by virtue of the provisions of
this Agreement, without any action on the part of the holders thereof, be deemed cancelled.

D.            Qoros Conversion. Following the completion of the Facility A Class B Conversion, and until the third anniversary of the Facility A Class B Conversion, the Company has

undertaken that, on request from the Lender, it will use its best efforts (including, but not limited to, assisting with obtaining any required governmental or regulatory approvals, but, for the avoidance of
doubt, such efforts shall exclude any requirement to make a repayment or prepayment of any existing indebtedness of Qoros) to take any and all steps required to convert and/or exchange the aggregate
Class A Interests held by the Class B Member as a result of the Class B Conversions into a direct holding by the Class B Member of an equity interest in Qoros in compliance with contractual obligations
(the   “ Qoros Conversion ”),   based   upon   the   then value of the indirect beneficial ownership in Qoros represented by the Class A Interests held by the Class B Member at the Qoros Conversion
Time (as defined below).

At the time at which the conversion of the Qoros Conversion becomes effective (the “ Qoros Conversion Time ”), all Class A Interests held by the Class B Member immediately prior
to the Qoros Conversion Time (including any rights attaching thereto) shall, by virtue of the provisions of this Agreement, without any action on the part of the holders thereof, be deemed cancelled and
Schedule A shall be adjusted to reflect the cancellation of the Class B Member’s Class A Interests.

 
 
Exhibit 4.21

Execution Version

Dated December 21, 2016

KENON HOLDINGS LTD.

and

CHERY AUTOMOBILE CO. LTD.

RELEASE AGREEMENT

 
 
  
 
 
 
 
 
 
 
 
 
 
 
CONTENTS

CLAUSE  

1.

2.

3.

4.

5.

6.

INTERPRETATION 

RELEASE 

INDEPENDENT GUARANTEE 

FURTHER ASSURANCE 

LANGUAGES 

GOVERNING LAW AND ENFORCEMENT 

PAGE

3

3

4

5

5

5

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
THIS RELEASE AGREEMENT is made on December 21, 2016 .

AMONG:

(1)

Kenon  Holdings  Ltd.  ,      a  Singapore  company  with  shares  listed  on  the  Tel  Aviv  Stock  Exchange  and  New  York  Stock  Exchange  (company  registration  no.
201406588W), whose legal address is at 1 Temasek Avenues, #36-01 Millenia Tower, Singapore 039192 (“ Kenon ”); and

(2)

Chery  Automobile  Co.,  Ltd. 
China (“ PRC ”) with its legal address at 8 Changchun Road, Economic and Technology Development Area, Wuhu, Anhui Province, China (“ Chery ”).

 ,    a  limited liability company duly organized and validly existing under the laws of the  People’s Republic  of

(Keon and Chery are hereinafter individually referred to as a “ Party ” and collectively the “ Parties ”.)

WHEREAS:

(1)

Kenon is the parent company of Quantum (2007) LLC (“ Quantum ”) and Chery is the major shareholder of Wuhu Chery Automobile Investment Co., Ltd. (“ Wuhu
Chery ”). Quantum and Wuhu Chery are equal shareholders of the Sino-foreign equity joint venture company Qoros Automotive Co., Ltd. (“ Qoros ”).

(2)

Qoros signed a RMB/USD dual currency facility agreement for fixed assets investment with an aggregate facility amount up to an equivalent of RMB3 billion  (the “
Loan Agreement ”) with contract No. YT41121230018 on 23 July 2012 with The Export-Import Bank of China, China Construction Bank Co., Ltd., Suzhou  Branch
(the “ Agent ”) and several other banks listed in the Loan Agreement as lenders (the “ Lenders ”). Pursuant to and subject to the terms and conditions of the Loan
Agreement, the Lenders agreed to make available to Qoros a long term loan facility in an aggregate amount not exceeding an equivalent of RMB3,000,000,000 (3
billion) in RMB/USD dual currency.

 
 
 
 
 
 
 
 
 
(3)

(4)

As a condition subsequent under the Loan Agreement, Chery entered into a guarantee deed with contract No. YT41121230018(A) and dated 23 July 2012 with the
Agent  to  provide  an  irrevocable  and  unconditional  guarantee  covering  50%  of  the  indebtedness  of  Qoros  under  the  Loan  Agreement  (the  “  Chery  Secured
Indebtedness ”).

Kenon  and  Chery  further  entered  into  a  guarantee  contract  (the  “  Kenon  Guarantee  ”)  dated  5  November  2015,  pursuant  to  which  Kenon  agreed  to  provide  an
irrevocable and unconditional guarantee to Chery for up to 50% of the Chery Secured Indebtedness (the “ Kenon Secured Indebtedness ”) up to a maximum amount
equal to the Total Amount (as defined in the Kenon Guarantee) .

(5)

It is contemplated that in connection with this Release Agreement, each of Quantum and Wu Chery will agree to provide a shareholder loan of RMB 250 million to
Qoros (each a “ 250m Shareholder Loan ”).

(6)

Kirby Enterprises Inc. (“ Kirby ”) has agreed to provide a Comfort Letter to Chery in relation to the Chery Secured Indebtedness for up to RMB 250 million pursuant
to the terms of a Comfort Letter between Kirby and Chery dated on the same date of this Release Agreement (“ Kirby Comfort Letter ”).

(7)

Quantum has agreed to create a first priority pledge over the Pledged Equity (as defined in the Quantum Share Pledge) of Qoros in favour of Chery pursuant to the
terms and conditions of an equity pledge agreement dated on the same date of this Release Agreement (“ Quantum Share Pledge ”).

2

 
 
 
 
 
(8)

In consideration of the provision of the 250m Shareholder Loan by Quantum to Qoros (to be made in connection with a 250m Shareholder Loan from Wuhu Chery),
and provision of Quantum Share Pledge by Quantum, the Parties would like to release Kenon from certain guarantee obligations under the Kenon Guarantee.

IT IS AGREED as follows:

1.

INTERPRETATION

1.1

Incorporated definitions

Words and expressions defined in the Kenon Guarantee shall have the same meanings when used in this Release Agreement unless otherwise provided or the context
otherwise requires.

2.

RELEASE

The parties agree that, upon provision of the 250m Shareholder Loan by Quantum to Qoros, the provision of the Kirby Comfort Letter by Kirby and the provision of
the Quantum Share Pledge by Quantum:

(a)

the  guaranteed  obligations  of  Kenon in  relation  to  the  Kenon  Secured  Indebtedness  under  the  Kenon Guarantee,  including  but  not limited  to  the principal  amounts
drawn  under  the  Loan  Agreement,  shall,  be  reduced  by  the  Equity  Pledge  Portion  (as  defined  below)  such  that  Kenon  shall  continue  to  assume  its  guaranteed
obligations in relation to the Kenon Portion (as defined below) in accordance with the terms of the Kenon Guarantee, subject to the Total Amount as reduced pursuant
to paragraph (b) below;

For the purpose of this paragraph (a):

(i)

“Equity Pledge Portion” means one-third of the obligations in relation to the Kenon Secured Indebtedness which are required to be guaranteed by Kenon under
the Kenon Guarantee, calculated as if this Release Agreement had not been entered into (and Chery will seek recourse against the Quantum Share Pledge and
the Kirby Comfort Letter in respect of such obligations); and

3

 
 
 
 
 
 
 
 
(ii)

“Kenon Portion” means two-thirds of the obligations in relation to the Kenon Secured Indebtedness which are required to be guaranteed by Kenon under the
Kenon Guarantee, calculated as if this Release Agreement had not been entered into.

(iii)

For the avoidance of doubt, the Equity Pledge Portion and the Kenon Pledge Portion shall be subject to partial or full repayment or other discharge of Kenon
Secured Indebtedness from time to time from the date of this Release Agreement,

(b)

the Total Amount as referred to in Clause 2 of Kenon Guarantee shall be reduced by an amount of RMB250 million such that the maximum guaranteed obligations of
Kenon in relation to the Kenon Secured Indebtedness under the Kenon Guarantee shall be reduced accordingly.

The other terms and conditions under the Kenon Guarantee, in particular, the terms and conditions for Kenon to perform or pay any liabilities, obligations and amount
under the Kenon Guarantee shall remain unchanged except as provided herein.

3.

INDEPENDENT GUARANTEE

The provision of the Quantum Share Pledge by Quantum to Chery or the exercise of Chery of its rights under the Quantum Share Pledge shall not in any way affect the
obligations of Kenon under the Kenon Guarantee as amended and reduced  by this Release Agreement.

4.

FURTHER ASSURANCE

Chery will, at the request and cost of Kenon, take whatever action which is reasonably necessary to release the Released Kenon Obligation from the Kenon Secured
Indebtedness.

4

 
 
 
 
 
 
 
 
5.

LANGUAGES

This  Release  Agreement  shall  be  executed  in  English  and  Chinese.  To  the  extent  there  is  any  discrepancy  between  the  English  and  Chinese  versions,  the  English
version shall prevail.

6.

GOVERNING LAW AND ENFORCEMENT

6.1

Governing law and disputes settlement

This Release Agreement is governed by and construed in all respects in accordance with the laws of the PRC.  The provisions of Clause 19 of the Kenon Guarantee
shall apply to this Release Agreement as if set out in full in this Release Agreement with references to “this Guarantee Contract” being treated as references to this
Release Agreement.

6.2

Counterparts

This Release Agreement may be executed in any number of counterparts.

THIS RELEASE AGREEMENT has been executed on the date stated at the beginning of this Release Agreement.

5

 
 
 
 
 
 
 
 
Kenon Holdings Ltd. 

SIGNATORIES

Release Agreement

 
 
 
Release Agreement

 
 
Exhibit 4.22

Execution Version

Quantum (2007) LLC

Quantum (2007) LLC

(as “Pledgor”)

Chery Automobile Co. Ltd.

(as “Pledgee”)

Equity Pledge Contract

December 21, 2016

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
This Equity Pledge Contract is entered into on December 21, 2016 by and between:

1.

2.

Quantum  (2007)  LLC,  as  the  pledgor,  a  limited  liability  company  incorporated  under  the  laws  of  the  State  of  Delaware,  the  United  States  of  America,  with  its  legal  address  at  16192  Coastal
Highway, Lewes, Delaware 19958, USA (hereinafter referred to as the “ Pledgor ”);

Chery Automobile Co., Ltd., a limited liability company duly organized and validly existing under the laws of the People’s Republic of China (the “ PRC ”) (the “ Pledgee ”).

WHEREAS:

1. Kenon Holdings Ltd. (“ Kenon ”) 

Kenon Holdings Ltd. (“ Kenon ”) is the parent company of the Pledgor.

2.

Qoros Automotive Co., Ltd. (“ Qoros Automotive ”) signed a RMB/USD dual currency  facility agreement  for fixed assets investment with an aggregate facility  amount up to an equivalent  of
RMB3 billion (the “ Loan Agreement ”) with contract No. YT41121230018 on 23 July 2012 with The Export-Import Bank of China (the “ Exim Bank ”), China Construction Bank Co., Ltd.,
Suzhou Branch (the “ Agent ”) and several other banks listed in the Loan Agreement as lenders (the “ Lenders ”). Pursuant to and subject to the terms and conditions of the Loan Agreement, the
Lenders  agreed  to  make  available  to  the  Qoros  Automotive  a  long  term  loan  facility  in  an  aggregate  amount  not  exceeding  an  equivalent  of  RMB3,000,000,000  (3  billion)  in  RMB/USD  dual
currency.

1

 
 
 
 
 
3.

4.

5.

6.

As  a  condition  subsequent  under  the  Loan  Agreement,  the  Pledgee  entered  into  a  guarantee  deed  with  contract  No.  YT41121230018(A)  and  dated  23  July  2012  with  the  Agent  to  provide  an
irrevocable and unconditional guarantee covering 50% of the indebtedness of the Qoros Automotive under the Loan Agreement (the “ Chery Secured Indebtedness ”) (the “ Chery Guarantee ”).

Kenon and the Pledgee further entered into a guarantee contract (as amended by the Release Agreement (defined below), the “ Kenon Guarantee ”) dated 5 November 2015, pursuant to which
Kenon agreed to provide an irrevocable and unconditional guarantee to Pledgee for up to 50% of the Chery Secured Indebtedness up to a maximum amount equal to the Total Amount (as defined in
the Kenon Guarantee) (the “ Kenon Secured Indebtedness ”).

On or about the date of this Equity Pledge Contract, Kenon and the Pledgee have entered or will enter into a release agreement in relation to release of certain guarantee obligations by Kenon under
the Kenon Guarantee (the “Release Agreement” ).

On or about the date of this Equity Pledge Contract, Kirby Enterprises Inc. ( “Kirby” ) have entered or will enter into a letter with the Pledgee (the “Kirby Comfort Letter” ) pursuant which Kirby
may make payments to the Pledgee in certain circumstances in respect of Chery Secured Indebtedness.

2

 
 
 
7.

For the purpose of securing the Secured Indebtedness (as defined below), the Pledgor agrees to enter into this Equity Pledge Contract and the Pledgor agrees to, pursuant to the terms and conditions
of this Agreement create a first priority pledge over the Pledged Equity in favour of the Pledgee.

Therefore, both parties agree as follows:

  Definition and Interpretation

Unless otherwise provided in this Equity Pledge Contract, when the terms interpreted and defined in the Kenon Guarantee are used in this Equity Pledge Contract, they shall have the same meanings
as they have in the Kenon Guarantee.

2.1

  Pledged Equity

The Pledgor pledges to the Pledgee 8.78% capital contribution equity held by it in Qoros Automotive (together with any further equity interest in Qoros Automotive required to be pledged to the
Pledgee pursuant to this Equity Pledge Contract, hereinafter referred to as the “ Pledged Equity ”) in order to provide pledge security for all obligations and liabilities of Kenon under the Kenon
Guarantee which was released under the Release Agreement. “ Pledge ” means  the security expressed to be created by this Equity Pledge Contract, including all of the rights, title and interests in
and to the Pledged Equity which are or are to be vested in the Pledgee. The Pledged Equity is subject to adjustment such that in the event of a change in the calculation by the Pledgor and EXIM
Bank of net asset value for calculating the loan to value ratio for the equity pledge requirement  for the Syndicated Loan (defined below), then the amount of Pledged Equity shall be adjusted (and
Pledged Equity released, to the extent applicable) such that the loan to value ratio (calculated in the same manner as by the Pledgor and EXIM Bank pursuant to the Syndicated Loan) shall be 80%.

3

 
 
 
 
 
2.2

The Pledged Equity means all of the rights, title and interests of the Pledgor in and to the Pledged Equity, including but without limitation to the following rights:

(1)

(2)

(3)

Subject to the provisions contained in Article 6, all dividends generated from the Pledge Equity and payments of any other nature and the corresponding rights and interests in respect of the
Pledged Equity, which the Pledgor shall have the right to collect from Qoros Automotive;

Subject to the provisions contained in Article 6, the corresponding rights and interests of any warranty, acknowledgement and commitment made by another party which the Pledgor shall have
the  right  to  enjoy  in  respect  of  the  Pledged  Equity  under  the  Sino-foreign  equity  joint  venture  contract  for  the  establishment  of  Qoros  Automotive  (“  JV  Contract  ”)  and  the  articles  of
association (“ AoA ”) of Qoros Automotive;

Subject to the provisions contained in Article 6 any right enjoyed by the Pledgor in respect of the Pledged Equity, to claim for default compensation  arising out of default by any other party
under the JV Contract and AoA of Qoros Automotive;

4

 
 
 
2.3

Trigger Event

A "Trigger Event" shall occur upon the occurrence of (i) the Pledgee having paid to the Agent under the Chery Guarantee and, in respect of the amount which were as a result of such payment
originally recoverable from Kenon under the Kenon Guarantee (and subject to all of the conditions for recovery under Kenon Guarantee) but which Kenon was no longer liable to pay under the
Kenon  Guarantee  as  a  result  of  the  Release  Agreement  (the  "Released  Guarantee  Amount"  ),  and  (ii)  the  Pledgee  not  having  received  such  amount  following  30  Business  Days  after  Kenon
receives a valid written notice from the Pledgee in relation to such amount.  For the avoidance of doubt, Kenon shall have no obligation to make any payment to the Pledgee or any other person with
respect to the Released Guarantee Amount and failure to pay such amount shall not constitute a default by Kenon under the Release Agreement, the Kenon Guarantee or otherwise; rather, such
failure to pay only results in a Trigger Event for purposes of Clause 11 of this Equity Pledge Contract.

3.1

  Scope of Security

The main creditor’s rights secured by the Pledged Equity under this Equity Pledge Contract shall be at any given time (hereinafter referred to as the “ Main Creditor’s Rights”):

5

 
 
 
(1)

the main creditor’s rights formed of the Equity Pledge Portion as defined under the Release Agreement;

less the following amounts:

(2)

3.2

if amounts contemplated to be paid under the Kirby Comfort Letter are paid, the aggregate amount of such payments.

 The scope secured by the Pledged Equity according to this Equity Pledge Contract shall be the sum of the following amounts (hereinafter referred to as the “ Secured Indebtedness ”):

(1)

(2)

The Main Creditor’s Right and the interests (including but not limited to any interest, compound interest and default interest) arising out of the Main Creditor’s Right;

All necessary and reasonable fees and expenses paid by the Pledgee to realize the interests of security under this Equity Pledge Contract (including but not limited to the legal costs, property
preservation fees, travel expenses, valuation fees, auction fees, attorney fees, notary fees, judgment enforcement fees, etc.); and any other necessary and reasonable fees which shall be borne by
the Pledgor in accordance with this Equity Pledge Contract.

6

 
 
 
 
 
3.3

3.4

4.1

The  performance  term  of  the  secured  Main  Creditor’s  Rights  under  this  Equity  Pledge  Contract  shall  commence  from  the  effectiveness  of  the  Chery  Guarantee  or  the  effective  date  of  Kenon
Guarantee, whichever is earlier, until ten (10) days after the Chery Guarantee term under the Chery Guarantee, or two (2) years after the Pledgee performs the Chery Secured Indebtedness owned by
the Pledgee under Chery Guarantee, whichever is later.

For any certificate presented by the Pledgee to indicate any Secured Indebtedness (i.e. statement of account chopped by Qoros Automotive upon confirmation) or any account payable by the Pledgor
under this Equity Pledge Contract, unless the Pledgor is able to provide sufficient and effective evidence to prove its conspicuous mistake, such certificate shall be the final proof of the creditor-
debtor relationship between the Pledgee and Kenon or the Pledgor, which shall be binding on the Pledgor.

  Nature and Effectiveness of Security

7

 
 
 
 
 
8

Generally, the Pledgor’s security obligation under this Equity Pledge Contract is of continuity wherein the security responsibility of the Pledgor shall be released only when the Secured Indebtedness is
paid off, which shall not be affected by any changes made to the shareholding structure, organizational structure or business operations of the Pledgor. However, if, after the issuance of the audited
Financial Statements of the next Fiscal Year and each Fiscal Year thereafter of Qoros Automotive (which should not occur before the first quarter of 2017), (i) the Pledgor is required by the 1.2 billion
RMB loan equity pledge contract (which means the Equity Pledge Contract for 1.2 Billion RMB Equivalent Syndicated Loan (the “Syndicated Loan” ) concerning Project of Research and Development
of C Platform Derivative Model of Qoros Automotive Co., Ltd. by and between the Pledgor and Bank of China Limited Su Zhou Branch), to provide an additional equity pledge ( “Additional Pledged
Shares” ) concerning its equity in Qoros Automotive to Exim Bank, Bank of China Limited Su Zhou Branch, and Industrial Bank Co., Ltd., Su Zhou Branch and such additional pledge can only be
satisfied by using all or a portion of the same equity which has been pledged under this Equity Pledge Contract, and (ii) the Pledgor is unable to obtain Additional Pledged Shares through a conversion of
existing loans in Qoros Automotive ( “Loan Conversion” ), then the pledge with respect to all or such portion of pledged equity under this Equity Pledge Contract, in an amount equal to the number of
Additional Pledged Shares required to be pledged under the Syndicated Loan and which cannot be obtained through a Loan Conversion, shall automatically be released and the Pledgee shall take all
actions as may be required to deregister the same pledge with the competent authorities, provided that after such release, the Pledgee shall have the right to request a second priority pledge over such
equity, subject to the consent of Exim Bank, Bank of China Limited Su Zhou Branch, and Industrial Bank Co., Ltd., Su Zhou Branch. In the event that the Pledgor is required to pledge Additional
Pledged Shares pursuant to the foregoing sentence and the equity interest in Qoros Automotive released pursuant to the foregoing sentence is not sufficient to provide the Pledgor with sufficient equity in
Qoros Automotive to satisfy the requirement to pledge Additional Pledged Shares, then to the extent that Pledgee has any Borrowed Shares (as defined below) (regardless of whether such Borrowed
Shares are pledged to the Lenders), the Pledgee shall, upon request from Pledgor, return to Pledgor the Borrowed Shares required for effecting the relevant additional equity pledge.

If the Additional Pledged Shares requested to be provided by the Pledgor cover less than 8% equity interest in Qoros Automotive, then, to the extent the Pledgor has sufficient Unencumbered Shares (as
defined below) and provided that Exim Bank consents (having regard to this Equity Pledge Contract), the Pledgee shall be entitled to use up to 5% unencumbered equity interest in Qoros Automotive
owned by the Pledgor (the “ Borrowed Shares ”) to provide, pursuant to the Equity Pledge Contract for the Syndicated Loan concerning Project of Research and Development of C Platform Derivative
Model of Qoros Automotive Co., Ltd. by and between the Pledgee and Bank of China Limited Su Zhou Branch, an additional equity pledge over such equity in Qoros Automotive to Exim Bank, Bank of
China Limited Su Zhou Branch, and Industrial Bank Co., Ltd., Su Zhou Branch. For the avoidance of doubt, if the additional equity pledge in respect of the Borrowed Shares is enforced by the Lenders
pursuant to the terms of the additional equity pledge, the Pledgor shall not be entitled to have any recourse against the Pledgee in respect of the Borrowed Shares, provided that the amount of such equity
interests so enforced shall offset and reduce, by an equivalent amount, equity interests otherwise required to be pledged by Pledgor under this Equity Pledge Contract.

9

 
Such Borrowed Shares shall be returned to the Pledgor as soon as is reasonably practicable after such Borrowed Shares have been released by the Lenders from the relevant additional equity pledge. To
the extent that such Borrowed Shares have not been returned after the relevant release, and Pledgee seeks to exercise its rights under Section 11.1 hereunder, it shall, prior to exercising such rights, return
the Borrowed Shares or failing which, the Borrowed Shares may be retained by the Pledgee and such retained shares shall be deemed to replace the Pledged Equity (to the extent of the Borrowed Shares)
for all purposes hereunder and the pledge over any Pledged Equity that would no longer be required to be pledged under the loan-to-value requirement set forth in Section 9.10, shall be released.

Notwithstanding any other provision or terms of this Equity Pledge Contract, If :

Kenon provides the Pledgee with guarantee security with respect to performance of all the obligations under the Main Creditor’s Rights on substantially the same terms and conditions as those set out
in the Kenon Guarantee; or

2.

the Main Creditor’s Rights have been satisfied and discharged in full,

 then (1) the Pledged Equity shall be automatically released from this Equity Pledge Contract and the Pledgee required to return the Pledged Equity (and all Borrower Shares) to the Pledgor, (2) all
obligations owing by the Pledgor under this Equity Pledge Contract shall be automatically released and discharged in full and (3) this Equity Pledge Contract shall be automatically terminated.

10

 
 
 
 
 
 
 
 
 
4.2

4.3

4.4

4.5

5.1

The effectiveness of this Equity Pledge Contract is independent from the Kenon Guarantee. This Equity Pledge Contract shall not become invalid due to invalidation of the Kenon Guarantee.

Kenon and the Pledgee may amend or supplement provisions under the Kenon Guarantee upon negotiation without the consent of the Pledgor. The Pledgor shall undertake security responsibility
within the scope of the amended creditor’s right except for the circumstances which increase the responsibility of the Pledgor.

The effectiveness  of this  Equity Pledge  Contract  and  the validity  of Pledge  under this  Equity Pledge  Contract  shall  not be  affected  by liquidation,  merger,  spin-off,  restructuring,  bankruptcy  or
shareholding or organization change in other forms of the Pledgor or any other person or any other arrangement made to Kenon’s debts.

The Pledge provided by the Pledgor for the Secured Indebtedness hereunder is an independent security and shall not be construed as a joint security with any other securities provided by any third
party in relation to the Kenon Guarantee.

Pledge Approval and Registration

11

 
 
 
 
 
 
 
The  Pledgee  and  the  Pledgor  shall  record  the  equity  pledge  in  the  Qoros  Automotive’s  Register  of  Shareholders  within  twenty  (20)  Business  Days  after  this  Equity  Pledge  Contract  and
commence the approval procedures for this Equity Pledge Contract with the competent Commerce Commission in charge of Qoros Automotive (if any) and subsequently file for registration of
this Equity Pledge Contract with the competent Administration for Industry and Commerce in charge of Qoros Automotive pursuant to the provisions of laws and regulations of the PRC.

5.2

When the Pledgor processes the approval and registration procedures of the Pledged Equity according to the provisions of this Equity Pledge Contract, the Pledgor shall deliver to the Pledgee for
its keeping of the certificate of other rights of the Pledged Equity and relevant certificates of property rights (if any). Within ten (10) Business Days after the Secured Indebtedness is completely
paid off, the Pledgee shall return the aforesaid originals to the Pledgor, and assist the Pledgor in completing the pledge deregistration procedures. The expenses incurred therefrom shall be borne
by the Pledgor.

After the principal underlying the Secured Indebtedness has been paid off by at least 50% (as compared to amounts outstanding under the Loan Agreement on the date of this Equity Pledge
Contract  and giving  effect  to  the  Release  Agreement),  the Pledgor  is  entitled  to  apply  in  writing  to the  Pledgee  to  decrease  the Pledged  Equity by 50%.  The Pledgee  shall  not  unreasonably
withhold its consent for such decrease and the Pledgee shall go through relevant pledge deregistration formalities of the decreased part of the Pledged Equity with the Pledgor within ten (10)
Business Days after and pursuant to the resolution of the Pledgee. The Pledgor shall bear the fees and expenses arising from such decrease of the Pledged Equity.

12

 
 
 
 
 
 
 
 
 
 
 
 
 
 
5.3

5.4

6.1

In case of the change of pledge approval and/or registration matters under this Equity Pledge Contract or of the name of Qoros Automotive, which needs to be approved and/or registered for
alteration in respect of equity pledge pursuant to the laws, the Pledgor and the Pledgee shall commence the alteration approval and registration procedures in the relevant authorities of approval
and registration within thirty (30) Business Days from the date as of which the cause of alteration has become known to the relevant party.

This Equity Pledge Contract shall take effect upon approval by competent Commerce Commission without any changes to this Equity Pledge Contract (unless such change has been agreed by
both parties hereto in writing), and the pledge right of the Pledged Equity shall be established as of the date of the pledge registration of the Equity Pledge Contract with the locally competent
Administration of Industry and Commerce in charge of Qoros Automotive.

Exercise of Rights and Performance of Obligations by the Shareholder

13

  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Notwithstanding the Pledge of the Pledgor’s rights, title and interests in and to the Pledged Equity, from the date of execution of this Equity Pledge Contract and until the date when the Secured
Indebtedness is paid off, the Pledgor and Qoros Automotive shall be entitled to exercise all rights and shall be obliged to fulfill all obligations of the Pledgor and Qoros Automotive (as case may
be) under the JV Contract and the AoA of Qoros Automotive.

6.2

6.3

Unless an Event of Default under the Kenon Guarantee or a Trigger Event has occurred and is continuing and notice of such an Event of Default has been given by the Pledgee in accordance
with the terms of the Kenon Guarantee (or notice of Trigger Event has been given hereunder), the Pledgor shall be entitled to retain and to exercise any voting and dividend and other rights
which it may have in respect of the Pledged Equity. If an Event of Default under the Kenon Guarantee or a Trigger Event has occurred and is continuing and notice of such an Event of Default
has been given validly by the Pledgee in accordance with the Kenon Guarantee (or notice of Trigger Event has been given hereunder), and amounts owing under the Kirby Comfort Letter have
not been paid within 60 days following valid notice delivered to Kirby, the Pledgor shall procure that all voting and dividend and other rights in respect of the Pledged Equity are exercised in
accordance with the instructions of the Pledgee.

The Pledgor shall continue to abide by and perform all the obligations and responsibilities in connection with the Pledged Equity and as the shareholder of Qoros Automotive.

14

 
 
 
 
 
 
 
 
 
 
 
 
 
The Pledgee do not need to perform any obligation or responsibility of the Pledged Equity which shall be undertaken by the Pledgor. The Pledgee shall also not be obligated to take any action in
respect of the Pledged Equity. The Pledgee shall not be obligated to undertake any obligation or responsibility to any other party in respect of the Pledged Equity due to this Equity Pledge
Contract, except as otherwise required by law.

Submission of Documents by the Pledgor

7.1

7.2

The Pledgor shall ensure that the Pledgee will receive from the Pledgor or from Qoros Automotive the following documents within twenty (20) Business Days after execution of this Equity
Pledge Contract:

(1)

(2)

(3)

the original English written document of the Pledgor’s shareholder approving the Pledgor to pledge its Pledged Equity to the Pledgee;

photocopies of the relevant supporting documents proving that the equity pledge under this Equity Pledge Contract is recorded in the Register of Shareholders of Qoros Automotive;

any other documents as reasonably required by the Pledgee to be provided by the Pledgor.

The Pledgor will undertake its best efforts that the Pledgee will receive either from the Pledgor or from Qoros Automotive the following documents latest within ninety (90) Business Days after
execution of this Equity Pledge Contract:

(1)

15

 
 
 
 
 
 
                      
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the relevant supporting documents proving that the competent Commerce Commission in charge of Qoros Automotive has approved this Equity Pledge Agreement (if any);

(2)

the relevant supporting documents proving that the competent Administration for Industry and Commerce in charge of Qoros Automotive has carried out the pledge registration for this
Equity Pledge Agreement.

7.3

8.1

If the documents provided by the Pledgor according to this Equity Pledge Contract are photocopies, they shall be either signed by the legal or authorized representative of the Pledgor or affixed
with the company seal of Qoros Automotive to confirm that they are true, complete and valid documents. If the documents provided by the Pledgor according to this Equity Pledge Contract are
from abroad, these documents shall comply with the requirements of the PRC laws and regulations and relevant PRC government authorities.

Representations and Warranties

The Pledgor hereby represents and warrants to the Pledgee as follows:

(1)

(2)

The Pledgor is a limited liability company, is legally incorporated and validly existing pursuant to the laws of the State of Delaware, the United States of America ;

The  Pledgor  has  full  civil  rights  and  capacity  to  operate  its  business,  execute  this  Equity  Pledge  Contract  and  exercise  its  rights  and  perform  its  obligations  according  to  this  Equity
Pledge Contract;

16

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
(3)

(4)

(5)

The Pledgor has completed all the internal corporate procedures required for the execution of this Equity Pledge Contract and exercise of the rights and performance of the obligations in
accordance with this Equity Pledge Contract, and this Equity Pledge Contract has been executed by duly authorized representative of the Pledgor and shall have binding effect on the
Pledgor;

The Pledgor’s obligations under this Equity Pledge Contract are legitimate and valid, which shall have binding effect on the Pledgor and could be implemented according to the
provisions of this Equity Pledge Contract;

The  execution  hereof  and  exercise  of  the  rights  and  performance  of  the  obligations  pursuant  to  this  Equity  Pledge  Contract  by  the  Pledgor  do  not  and  will  not  be  in  violation  of  or
conflicting with any of the following documents:

(i)

(ii)

(iii) 

any agreement, contract or any other documents of contractual nature having binding effect on any of the Pledgor’s assets to which the Pledgor is a party;

articles of association and other fundamental corporate documents of the Pledgor; or

any laws, regulations, judgment, ruling and adjudication applicable to  the Pledgor;

17

 
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(6)

(7)

(8)

(9)

(10)

All the authorizations, consents, approvals and permits required or necessary for the conclusion, performance and execution of this Equity Pledge Contract and for the transactions under this
Equity Pledge Contract have been duly obtained by the Pledgor, which are valid and effective;

The execution hereof and exercise of the rights and performance of the obligations in accordance with this Equity Pledge Contract by the Pledgor is the business behavior conducted for the
purpose of business, which shall be fully subject to civil and business laws;

In any ongoing judicial proceedings in PRC in which it acts as one party, the Pledged Equity shall not enjoy any immunity or privilege in the proceedings relating to litigation, judgment,
enforcement, property preservation, or other judicial proceedings;

There currently does not exist any arbitration, litigation or administrative proceeding involving the Pledged Equity, which will have any Material Adverse Effect on the value of the Pledged
Equity,  or  the  Pledgor’s  capability  of  performing  its  obligations  according  to  this  Equity  Pledge  Contract.  The  Pledged  Equity  has  not  been  sealed-up  or  frozen  due  to  any  property
preservation procedures;

18

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Pledgor legally possesses the ownership right and right of disposition of the Pledged Equity over which there is no dispute and which could be the subject matter of the pledge security
pursuant to the laws. If the Pledged Equity belongs to the property which needs approval or consent by relevant authorities before pledge, the Pledgor guarantees that it has obtained valid and
effective approval or consent;

Except  for  the  security  created  under  this  Equity  Pledge  Contract,  there  is  no  security  on  the  Pledged  Equity  in  any  form,  co-ownership,  any  rights  of  the  third  party  or  any  dispute  of
ownership or any circumstance that may lead to Material Adverse Effect on the exercise of the right of pledge by the Pledgee, subject to Article 4.1;

All the materials, documents and evidence provided by the Pledgor to the Pledgee are true, accurate, complete and effective, and the documents provided in photocopy are in conformity with
the originals.

(11)

(12)

8.2

The abovementioned representations and warranties made by the Pledgor shall all the time be accurate and error-free during the valid term of this Equity Pledge Contract, and the Pledgor
guarantees that it will provide further documentation required by the Pledgee at any time.

          Covenants

The Pledgor hereby covenants to the Pledgee, from the date of effectiveness of this Equity Pledge Contract until the termination of the rights and obligations of the Pledgor under this Equity Pledge
Contract, that:

9.1

19

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
9.2

9.3

9.4

The Pledgor shall maintain the legitimate, continuing, and valid existence of its enterprise legal entity status, and comply with all the laws and regulations applicable to it.

The Pledgor shall ensure that its business nature and business scope will not have any alteration which will have a Material Adverse Effect on the rights and interests of the Pledgee under this
Equity Pledge Contract.

Unless the Pledged Equity is disposed of in accordance with the provisions of this Equity Pledge Contract, the Pledged Equity under this Equity Pledge Contract shall be possessed and managed by
the Pledgor, and shall be continuously possessed and managed by the Pledgor during the valid term of this Equity Pledge Contract, subject to Article 4.1.

Upon occurrence of any of the following events, the Pledgor shall notify the Pledgee within ten (10) Business Days after its occurrence:

(1)

(2)

(3)

any event of default specified under Article 10.1 of this Equity Pledge Contract;

any litigation, arbitration or legal proceedings mentioned in Article 8.1 (9) hereunder;

Occurrence of any dispute over the ownership of the Pledged Equity or measures having been taken on the Pledged Equity including but not limited to the sealed-up, sequestration, freezing,
surveillance, etc .;

20

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(4)

(5)

Loss or destruction of the Pledged Equity;

Occurrence  of  or  the  awareness  by  the  Pledgor  of  any  event  that  may  materially  affect  the  capability  of  the  Pledgor  of  performing  its  obligations  in  accordance  with  this  Equity  Pledge
Contract

The Pledgor shall provide the Pledgee with all documents and materials in relation to the Pledge matters under this Equity Pledge Contract as the Pledgee reasonably requires at any time, and
ensure the authenticity, accuracy and completeness of all the provided materials as mentioned above.

The Pledgor shall be responsible for the matters such as evaluation, notarization, appraisal and preservation of the Pledged Equity under this Equity Pledge Contract and cooperate with the Pledgee
relating to the Pledge approval and registration of the Pledged Equity. All the expenses thereof shall be borne by the Pledgor, and the relevant intermediary organs of evaluation, notarization and
appraisal shall be approved by the Pledgee in advance.

Except as contemplated by this Equity Pledge Contract, without the prior written consent of the Pledgee, the Pledgor shall not transfer, grant, re-pledge or make capital contribution by way of
Pledged Equity or otherwise dispose of all Pledged Equity specified in this Equity Pledge Contract, subject to Article 4.1.

21

9.5

9.6

9.7

 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9.8

9.9

9.10

Upon prior written consent of the Pledgee, proceeds generated by means of transferring any of the Pledged Equity specified in this Equity Pledge Contract by the Pledgor shall be executed in
compliance with Article 11 of this Equity Pledge Contract.

In any case, the transfer of the Pledged Equity specified in this Equity Pledge Contract in accordance with the provisions hereof by the Pledgor shall not harm the interests of the Pledgee, subject to
Article 4.1.

Unless otherwise specified under this Equity Pledge Contract, if Kenon or other third party establishes the right of property security for the interests of the Pledgee by its own properties over the
Main Creditor’s Right under this Equity Pledge Contract, the Pledgor hereby warrants that if the Pledgee waive the right of property security provided by Kenon or the third party, the sequence
thereof, or the alternation of the right of property security, the foregoing actions will not affect or exempt any obligation or security responsibility hereunder and the Pledgor’s scope of security will
not be decreased therefrom. Meanwhile, the Pledgor waives counterplead rights of the claim of the Pledgee’s advanced execution of the right of property security provided by Kenon or the third
party.

The Pledgor acknowledges and warrants that the loan-to-value ratio (loan-to-value ratio shall refer to the ratio between the amount of the principal amounts underlying the Main Creditor’s Rights
and the audited net assets value (to be determined in accordance with Chinese GAAP) of the Pledged Equity as calculated in the same manner as the equity pledge requirement is calculated by the
Pledgor and EXIM Bank pursuant to the Syndicated Loan) of the Pledged Equity under this Equity Pledge Contract shall not exceed eighty percent (80%):

22

 
 
 
 
 
  
 
 
 
 
 
 
 
(1)

(2)

(3)

The Pledgee shall have the right to check and examine at any time the value of the Pledged Equity (calculated on the basis of the audited net assets value of the Pledged Equity of Qoros
Automotive) or entrust qualified and professional asset valuation institution to value relevant Pledged Equity.

Where  the  net  assets  of  Qoros  Automotive  as  evidenced  in  the  audited  Financial  Statements  of  each  Fiscal  Year  of  Qoros  Automotive  varies  which  makes  the  loan-to-value  ratio  of  the
Pledged  Equity  hereunder  exceeds  eighty  percent  (80%),  the  Pledgor  is  obliged  to  provide  an  additional  equity  pledge  concerning  the  insufficient  part  of  the  Pledged  Equity  due  to  the
abovementioned reason: (i) subject to the last sentence of this Section 9.10 and (ii) except to the extent that a pledge of Additional Pledged Shares is permitted to be released pursuant to
Section 4.1.

Where the net assets in the audited Financial Statements of each Fiscal Year of Qoros Automotive varies which makes the loan-to-value ratio of the Pledged Equity hereunder lower than
eighty percent (80%), the Pledgee shall release part of the Pledged Equity established by the Pledgor under this Equity Pledge Contract, provided however that the loan-to-value ratio of the
remaining Pledged Equity shall still not exceed eighty percent (80%) after such release.

23

 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
The loan-to-value ratio of the Pledged Equity provided above shall be evaluated every year right after the audited annual Financial Statements of each Fiscal Year have been given by Certified
Public Accountant.

Notwithstanding  any  other  provision  of  this  Equity  Pledge  Contract,  including  Section  9.10,  the  Pledgor  shall  have  no  obligation  to  pledge  any  further  equity  interests  in  Qoros
Automotive unless it has available equity interests free from any security or encumbrance in Qoros Automotive (it being understood that such equity interests shall not include any
equity interests in Qoros Automotive already pledged to Exim Bank or which are required to be pledged to Exim Bank) ( “Unencumbered Shares” ).

10.1

Each of the following events shall constitute an event of default under this Equity Pledge Contract:

(1)

                 Event of Default

The Pledgor violates the provisions of Representations and Warranties in Article 8 or Covenants in Article 9 (provided, that, the loan-to-value ratio of the Pledged Equity exceeding
eighty percent percent (80%) due to the variation of the net assets in the audited Financial Statements of each Fiscal Year of Qoros Automotive set forth in Clause 9.10 (2) shall not
constitute an Event of Default under this Article 10) hereunder, which might materially affect the value of the Pledged Equity and the Pledgor fails to make remedies to the Pledgee’s
reasonable satisfaction  within ten (10) Business Days from the date of the Pledgor’s awareness of such event or the date of the issuance of a notice by the Pledgee requiring the
Pledgor to make remedies (whichever is earlier);

24

 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
(2)

(3)

(4)

(5)

The Pledgor fails to explain truthfully any of the flaws of the Pledged Equity under this Equity Pledge Contract to the Pledgee, which materially affects the value of the Pledged
Equity and the Pledgor fails to make remedies to the Pledgee’s satisfaction within ten (10) Business Days from the date of the Pledgor’s awareness of such event or the date of the
issuance of a notice by the Pledgee requiring the Pledgor to make remedies (whichever is earlier);

The Pledgor fails to complete the pledge registration procedures or alternation registration procedures according to this Equity Pledge Contract and the Pledgor fails to commence to
make remedies to the Pledgee’s satisfaction within thirty (30) Business Days as of the issuance of a notice by the Pledgee requiring the Pledgor to make remedies;

The Pledgor winds up or terminates its business or enters into the proceeding of bankruptcy, liquidation, business suspension or other similar legal proceeding; or the Pledgor is filed
for bankruptcy, liquidation or decided by the competent department to terminate or suspend business;

The Pledgor transfers, grants, re-pledges or makes capital contribution by using the Pledged Equity or otherwise disposes of the Pledged Equity in any other form in violation of the
provisions of this Equity Pledge Contract;

25

 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
(6)

(7)

10.2

The existence of co-ownership, ownership dispute, sealed-up, sequestration or the establishment of the pledge over the Pledged Equity;

The Pledgor interferes with the Pledgee to dispose of the Pledged Equity according to the provisions of Article 11 hereunder in any form (including act or omission);

After the occurrence of any event of default set forth under Article 10.1 hereunder, the Pledgee shall be entitled to take one of or several of the following actions:

(1)

(2)

(3)

(4)

subject to Article 11 notify in writing the Pledgor the intent to dispose of the Pledged Equity by means of auction or selling-off pursuant to the laws, and the proceeds derived from
disposing of the Pledged Equity shall be implemented according to Article 11 hereunder;

notify in writing Kenon of requiring it to provide separate security for the Kenon Guarantee to complement or swap the security against the Pledged Equity under this Equity Pledge
Contract;

File for lawsuit to the People’s Court with jurisdiction as is agreed in this Equity Pledge Contract;

exercise other rights granted by laws and this Equity Pledge Contract.

26

 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
               Realization of Right of Pledge

11.1

11.2

In case of occurrence of (i) a Trigger Event, and (ii) amounts owing under the Kirby Comfort Letter not having been paid within 60 days following valid notice delivered to Kirby, the Pledgee
is entitled to dispose of the Pledged Equity pursuant to the laws by direct auction or selling-off, and the proceeds derived from disposing of the Pledged Equity shall be applied:

(1)

(2)

to pay off the Secured Indebtedness; and

to pay the Pledgee all the fees incurred for the realization of the creditor’s rights under the secured interests under this Equity Pledge Contract paid by the Pledgee, any other fees,
liquidated damages, compensatory damages to be paid by the Pledgor under this Equity Pledge Contract, and all the tax incurred as a result of disposal of the Pledged Equity;

In the course of disposal of the Pledged Equity by the Pledgee according to Article 11.1 hereunder, the Pledgee is entitled to take the following actions pursuant to laws:

(1)

(2)

to dispose of the Pledged Equity by means of direct auction or selling-off at a proper time and at a market price as the Pledgee thinks appropriate and fair;

27

 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
 
 
  
(3)

(4)

(5)

to require the Pledgor to pay the Pledgee necessary expenses for the exercise of any rights hereunder or granted by laws;

to decide how to exercise all the rights enjoyed by the Pledgor as the shareholder of Qoros Automotive in respect of the Pledged Equity;

to resolve, settle, or initiate arbitration or litigation against the claim of rights raised by any person regarding the Pledged Equity, or to exercise or permit others to exercise any rights
over the Pledged Equity in such a manner as the Pledgee thinks proper;

to  exercise  any  other  rights  or  take  any  other  actions  as  permitted  by laws  in  order  to  realize  any  right  of  the  Pledgee  in  respect  of  the  Pledged  Equity  under  this  Equity  Pledge
Contract.

The Pledgee is entitled to choose to exercise all or part of the above-mentioned rights or to suspend the exercise of any right.

11.3

11.4

Upon  request  by  the  Pledgee,  the  Pledgor  shall  assist  the  Pledgee  in  obtaining  any  approvals  or  permits  indispensable  to  realize  the  Pledgee’s  rights,  or  assist  the  Pledgee  with  any  other
indispensable procedures.

28

 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
  
 
 
 
 
  
The Pledgors’ obligations under this Equity Pledge Contract shall be limited to the Pledged Equity and the Pledgee is entitled to have recourse against Kenon but only to the extent of the
security provided by the Pledged Equity and in no event shall the Pledgee have any recourse against the Pledgor beyond the Pledged Equity and the Pledgee shall have no recourse under this
Equity Pledge Contract  against  any of the Pledgor’s  affiliates,  including  Kenon.  For the  avoidance  of doubt, in no event  shall  this Equity Pledge Contract  increase  amounts  that  may be
payable by Kenon under the Kenon Guarantee or otherwise result in Kenon or the Pledgor having liabilities with respect to the Secured Indebtedness (other than with respect to the Pledged
Equity).  In  the  event  that  the  proceeds  of  a  disposition  by  the  Pledgor  in  accordance  with  this  Equity  Pledge  Contract  exceed  the  amount  of  Secured  Indebtedness,  such  excess  shall  be
remitted to Kenon or the Pledgor (at Kenon’s option).

11.5

After the Pledgee notifies the Pledgor in writing and bona finde of the intent to dispose of the Pledged Equity in accordance with the provisions under this Equity Pledge Contract, but prior to
Pledgee actually exercising their rights in terms of the Pledged Equity, the Pledgor

(a)

(b)

shall have the irrevocable right to provide to the Pledgee instead of the Pledged Equity equivalent cash with a value equal to the Secured Indebtedness as outstanding under the Kenon
Guarantee and with regards to which the Pledgee has the right to exercise the Pledge, to swap the Pledge established by the Pledgor in accordance with the Equity Pledge Contract; or

may provide to the Pledgee other securities which are agreed by the Pledgee in writing in advance (including but without limitation another equity pledge or a guarantee to be provided
by the Pledgor or any third party, etc.) with a value of the portion of the Pledged Equity hereunder with regards to which the Pledgee has the right to exercise the Pledge, to swap the
Pledge established by the Pledgor in accordance with the Equity Pledge Contract.

29

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
11.6

11.7

12.1

If the Pledgee announce the intention to exercise the Equity Pledge in accordance with its terms, and if the Pledgor offers the Pledgee one of the above swap options Art. 11.5 (a) or (b), the
Pledgee herewith irrevocable agree that the Pledgor has the right to decide to exercise such swap option under 11.5(a) at its sole discretion and the swap option under 11.5(b) subject to the prior
consent of the Pledgee and in any event with priority over the Pledgee exercising the Pledge hereunder. The Pledge of the relevant Pledged Equity after any such swap option being exercised
shall be released and relevant parties shall work co-operatively to complete going through procedures of modification and cancellation of the Pledge.

If any third party makes any claim to the Pledged Equity or raise any dispute in relation to the disposal of the Pledged Equity due to any reason, all consequences and liabilities arising therefrom
shall be borne by the Pledgor, and such claim and dispute shall not affect the disposal of the Pledged Equity by the Pledgee according to this Equity Pledge Contract.

           Fees

30

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
12.2

12.3

The Pledgor shall bear and pay all the taxes and fees in connection with this Equity Pledge Contract and in relation to the Pledged Equity hereunder (i.e, approval and registration fees of this
Equity Pledge Contract).

Upon request by the Pledgee, the Pledgor shall indemnify the Pledgee in full immediately for all necessary and reasonable expenses and fees paid by the Pledgee for its exercise of any rights in
this Equity Pledge Contract or in any documents mentioned herein in any jurisdiction, including but not limited to the reasonable financial expenses, attorney fees and litigation fees for the
disposal of the Pledged Equity by the Pledgee according to Article 11 hereunder.

Upon request by the Pledgor and on the costs of the Pledgor, the Pledgor shall be entitled to the right in relation to the required redelivery of the Borrowed Shared under this Equity Pledge
Contract. If such Borrowed Shares are not redelivered to the Pldgor in accordance with this Equity Pledge Contract, the Pledgee shall indemnify the Pledgor immediately for necessary and
reasonable  expenses  and  fees  paid  by  the  Pledgor  for  its  exercise  of  any  rights  in  this  Equity  Pledge  Contract  in  respect  of  required  redelivery  of  the  Borrowed  Shares,  in  any  jurisdiction,
including but not limited to the reasonable financial expenses, attorney fees and litigation fees.

The  Pledgor  shall  pay  at  any  time  all  the  current  and  future  approval  and  registration  fees  and  other  related  tax  imposed  on  the  Pledgor  in  this  Equity  Pledge  Contract  and  the  documents
mentioned hereunder.

31

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   Change of Subject

  This Equity Pledge Contract shall be binding upon each party hereto and its successor(s) and assignee(s) respectively.

   Information Disclosure

14.1

Any party hereto shall maintain the confidentiality of any information relating to all documents provided by or on behalf of one party to the other party with regard to this Equity Pledge
Contract (including but not limited to assessment report, insurance documents, and pledge registration documents of the Pledged Equity). However, the parties hereto and the Pledgee and
Qoros Automotive are entitled to:

(1)

(2)

(3)

(4)

(5)

disclose such information that has become known to the public (excluding the information made known to the public as a result of breach of this provision by the disclosing party);

disclose such information in any litigation or arbitration procedure;

disclose such information as required by laws or regulations;

disclose such information to any governmental, financial, tax or other regulatory authorities on an as-need basis;

disclose such information to its professional consultant on an as-need basis;

32

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(6)

(7)

(8)

disclose such information within the scope permitted by Article 14.2 hereunder;

disclose such information upon consent of the disclosed party;

Such disclosure is required pursuant to any applicable securities law or regulation or by order of any competent court or governmental authority or any stock exchange to be disclosed
(including but not limited to regulations applicable as a result of any listing at a stock exchange in New York by Kenon).

The Pledgee are entitled to disclose to any party who will make or has made with the Pledgee any assignment agreement or other agreement related to this Equity Pledge Contract
(hereinafter referred to as the “ Participants ”):

(1)

(2)

any copy of the documents related to this Equity Pledge Contract (including but not limited to assessment report, pledge registration documents etc . in relation to the Pledged Equity);
and

any information that the Pledgee have obtained related to the above documents.

Notwithstanding the foregoing, Participants shall submit written commitment that the Participant agrees to observe the confidentiality specified in Article 14.1 hereunder to the Pledgee
before receiving any such confidential information.

33

14.2

14.3

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Provisions  specified  in  Article  14.1  and  Article  14.2  as  mentioned  above  shall  supersede  any  confidentiality  covenants  that  the  Pledgee,  before  becoming  a  party  to  this  Equity  Pledge
Contract, have made with respect to this Equity Pledge Contract.

  Amendment and Supplement

15.1

15.2

The Pledgee and the Pledgor shall have right to amend provisions of this Equity Pledge Contract from time to time in writing. If such amendment involves the change of the approval and/or
registration  matters  of  this  Equity  Pledge  Contract,  the  Pledgor  is  obligated  to  assist  the  Pledgee  in  conducting  the  alternation  approval  and  registration  with  the  competent  authorities;  any
amendment made accordingly shall be binding upon all the Pledgee and the Pledgor.

If so required by the registration authority in charge of the registration of this Equity Pledge Contract, the Pledgee and the Pledgor agree to sign an amendment to this Equity Pledge Contract,
provided  that  the  alteration  of  the  terms  and  conditions  as  requested  by  the  registration  authority  in  charge  of  registration  of  this  Equity  Pledge  Contract,  do  not  impose  any  additional
obligations on the Pledgee and/or the Pledgor, unless each such party has consented in writing to such alterations or additional obligations.

34

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     Notice

16.1

16.2

16.3

Pursuant to this Equity Pledge Contract, any notice, request document or any other file to be sent to any party of this Equity Pledge Contract shall be in writing in English and/or Chinese and
delivered to the recipient(s) at the address, or fax number with the attention to the contact person (if applicable) designated from time to time by such recipient(s) in writing. The address, fax
number, and the contact person (if applicable) originally designated by the Parties are listed in the signing page of this Equity Pledge Contract.

Any communication made between the parties hereof pursuant to the provisions of this Equity Pledge Contract shall be deemed to have been received by the recipient after satisfaction of the
following conditions:

(1)

(2)

(3)

If delivered in person, at the time of the actual delivery;

If given by fax, at the time of a completion of transmission and a receipt of correct feedback, or a receipt of fax report;

If posted by international courier, at the time of 12:00 pm (Beijing time) of the seventh (7th) Business Day after a courier document has been posted to a contact address last notified by the
given party to the other party hereof

Any party hereto shall notify the other party of its change of contact person, address, or fax number within five (5) Business Days after the change has been completed.

35

  
 
 
 
 
 
 
 
 
    Waiver and Partial Invalidity

17.1

17.2

18.1

Neither failure to exercise nor delay in exercising of any rights by the Pledgee and/or the Pledgor under this Equity Pledge Contract shall operate as a waiver thereof, nor shall any single or
partial  exercise  of  any  right  prevent  the  Pledgee  and/or  the  Pledgor  from  exercising  such  right  further  or  in  any  other  means,  or  exercising  any  other  rights.  The  rights  and  remedies  herein
provided shall not exclude any rights or remedies of the Pledgee and/or the Pledgor provided by operation of law.

If, at any time, any provision of this Equity Pledge Contract becomes illegal, invalid or unenforceable in any aspect, neither the legality, validity nor the enforceability of the remaining provisions
hereof shall be in any way affected or impaired.

      Governing Law and Jurisdiction

This  Equity  Pledge  Contract  shall  be  governed  by  and  interpreted  in  accordance  with  the  PRC  laws  (including  but  not  limited  to  the  currently  effective  laws,  the  administrative  regulations,
decisions and orders issued by the State Council of PRC, the rules and regulations promulgated by various departments of the State Council and local governments, but excluding the laws of the
Hong Kong Special Administrative Region, the Macao Special Administrative Region and Taiwan).

36

 
 
 
 
18.2

19.1

19.2

19.3

Any dispute in connection with this Equity Pledge Contract shall be resolved through friendly negotiation between the Parties. If no settlement can be reached through negotiation, any party is
entitled to submit the dispute to the People’s Court with competent jurisdiction where Qoros Automotive is located.

This Equity Pledge Contract is prepared and executed in Chinese and English. Both two versions shall prevail equally.

      Contract Version

Matters not covered in this Equity Pledge Contract shall be negotiated separately by the Pledgor and the Pledgee, and the Pledgor and the Pledgee shall enter into supplementary agreement
thereof. If such supplementary agreement involves the change of the approval and/or registration matters of this Equity Pledge Contract, the supplementary agreement shall be submitted to the
authorities for alternation approval and/or registration pursuant to the applicable laws. The supplementary agreement and this Equity Pledge Contract shall have the equal legal effect.

The appendices hereof shall constitute effective integral part of this Equity Pledge Contract.

37

  
 
 
 
  
 
 
 
  
 
 
 
  
 
19.4

This Equity Pledge Contract shall be executed in seven (7) originals. The Pledgor and the Pledgee shall respectively keep one original. The remaining originals shall be saved and kept by
Qoros Automotive for the purpose of pledge registration of this Equity Pledge Contract. Each original shall have the same validity.

(The remaining part of this page is intentionally left blank)

38

 
 
  
 
 
  (1)

Signature Page (1)

 : Quantum (2007) LLC

Pledgor: Quantum (2007) LLC

39

 / Address: 1 TEMASEK AVENUE #36-01 MILLENIA TOWER SINGAPORE 039192

 / Postal Code: 039192

 /Person in Charge: ROBERT L. ROSEN

 / Telephone: +65 6351 1788

 /Fax: +65 6351 1798

 / Contact Persons: ROBERT L. ROSEN

 / Authorized Signatories:

 /Name: ROBERT L. ROSEN

 /Position: MANAGER

 /Date:           2016 

 /Year      12  

 /Month    20  

 /Day

 
 
 
 
 
40

 
 
Entity Name
I.C. Power Asia Development Ltd.
IC Power Ltd.
IC Power Distribution Holdings Pte. Ltd.
Compania Boliviana de Energia Electrica
S.A.—Bolivian Power Company Limited
Kallpa Generación S.A.
Cerro del Aguila S.A.
Hidro Chilia S.A.C.
Pacahuasi Energía S.A.
IC Power Southern Terminals S.A.
Nejapa Power Company S.A.
Samay III
Overseas Investments Peru S.A.
Surpetroil SAC
Samay I S.A.
PanaGen, Limited
Verde Securities Ltd.
Companía de Electricidad Puerto Plata S.A.
Compañía de Energía de Centroamérica S.A. - Cenergica
IC Power DR Operations SAS
Central Cardones S.A.
Lihuen S.A.
Cerro El Plomo S.A.
Termoeléctrica Colmito Limitada
OPC Rotem Ltd.
Jamaica Private Power Company Ltd.
Consorcio Eólico Amayo (Fase II) S.A.
Empresa Energética Corinto Ltd.
Tipitapa Power Company Ltd.
Surpetroil SAS
IC Power Trading SAS ESP(Colombia)
Surenergy SAS ESP
IC Power Development Colombia SAS
Inkia Energy Ltd.
Inkia Americas Ltd.
Inkia Americas Holding Ltd.
IC Power Holdings (Kallpa) Ltd.
Inkia Holdings (Cobee) Ltd.
IC Power Holdings (CEPP) Ltd.
IC Power Holdings (Panama Generation) Ltd.
Inkia Holdings (JPPC) Ltd.
IC Power Panama Management S. de .R.L
Inkia Salvadorian Power Ltd.
IC Power Holdings (Nejapa) Ltd.
Nejapa Holdings Company Ltd.
IC Power Holdings (CEPP—Cayman) Ltd.
West Indies Development Corporation Ltd.
IC Power Chile Inversiones Limitada
IC Power Chile SPA
IC Power Holdings (Chile) Limited
Kanan Overseas I Inc.
Kanan Overseas II Inc.
Kanan Overseas III Inc.
Kanan Overseas IV Inc.

Jurisdiction of Incorporation

Name(s) Under Which it Does Business

Exhibit 8.1

  Israel
  Singapore
  Singapore

  Canada
  Peru
  Peru
  Peru
  Peru
  Peru
  Panama
  Peru
  Peru
  Peru
  Peru
  Bermuda
  Bermuda
  Dominican Republic
  El Salvador
  Dominican Republic
  Chile
  Chile
  Chile
  Chile
  Israel
  Jamaica
  Panama
  Cayman Islands
  Cayman Islands
  Colombia
  Colombia
  Colombia
  Colombia
  Bermuda
  Bermuda
  Bermuda
  Bermuda
  Bermuda
  Bermuda
  Cayman Islands
  Barbados
  Panama
  Cayman Islands
  Cayman Islands
  Cayman Islands
  Cayman Islands
  Jamaica
  Chile
  Chile
  Bermuda
  Panamá
  Panamá
  Panamá
  Panamá

  IC Power Asia Development Ltd.
  IC Power Ltd.
  IC Power Distribution Holdings Pte. Ltd.
Compania Boliviana de Energia Electrica
  S.A. – Bolivian Power Company Limited
  Kallpa Generación S.A.
  Cerro del Aguila S.A.
  Hidro Chilia S.A.C.
  Pacahuasi Energía S.A.
  IC Power Southern Terminals S.A.
  Nejapa Power Company S.A.
  Samay III
  Overseas Investments Peru S.A.
  Surpetroil SAC
  Puerto Bravo
  PanaGen, Limited
  Verde Securities Ltd.
  Companía de Electricidad Puerto Plata S.A.
  Compañía de Energía de Centroamérica S.A. - Cenergica
  IC Power DR Operations SAS
  Central Cardones S.A.
  Lihuen S.A.
  Cerro El Plomo S.A.
  Termoeléctrica Colmito Limitada
  OPC Rotem Ltd.
  Jamaica Private Power Company
  Consorcio Eólico Amayo (Fase II) S.A.
  Empresa Energética Corinto Ltd.
  Tipitapa Power Company Ltd.
  Surpetroil SAS
  IC Power Trading SAS ESP(Colombia)
  Surenergy SAS ESP
  IC Power Development Colombia SAS
  Inkia Energy Ltd.
  Inkia Americas Ltd.
  Inkia Americas Holding Ltd.
  IC Power Holdings (Kallpa) Ltd.
  Inkia Holdings (Cobee) Ltd.
  IC Power Holdings (CEPP) Ltd.
  IC Power Holdings (Panama Generation) Ltd.
  Inkia Holding (JPPC) Ltd.
  IC Power Panama Management S. de .R.L
  Inkia Salvadorian Power Ltd.
  IC Power Holdings (Nejapa) Ltd.
  Nejapa Holdings Company Ltd.
  IC Power Holdings (CEPP—Cayman) Ltd.
  West Indies Development Corporation Ltd.
  IC Power Chile Inversiones Limitada
  IC Power Chile SPA
  IC Power Holding (Chile) Limited
  Kanan Overseas I Inc.
  Kanan Overseas II Inc.
  Kanan Overseas III Inc.
  Kanan Overseas IV Inc.

 
 
 
Entity Name
Cenérgica Panamá Holdings II S.A.
Cenérgica Panamá Holdings I S.A.
PE Panama Energy S.A.
IC Power Holdings (Colombia) Trading
Limited
I.C. Power Israel Ltd.
IC Power Nicaragua Holdings
IC Power Nicaragua S.A.
IC Power Jamaica Holdings Ltd.
IC Power Jamaica I Ltd.
IC Power Jamaica II Ltd.
IC Power Jamaica Inc.
Private Power Operator
IC Power Jamaica III
Inversiones Waxere S.A
Amayo O&M Services S.A.
Nicaragua Energy Holdings Ltd.
Centrans Energy Holdings (Amayo) S.A.
Consorcio Eólico Amayo S.A.
Arctas Amayo (Fase II S.A.)
IC Power Guatemala Limitada
Poliwatt Limitada
IC Power Guatemala Holdings Ltd.
A.G.S. Rotem Ltd.
Puerto Quetzal Power LLC
IC Power USA Services Corp.
Las Codornices S.A.
Inkia Energy Guatemala Ltd.
Estrella Cooperatief B.A.
Recsa B.V.
Guatemel B.V.
Deorsa B.V.
Deocsa B.V.
Distribuidora de Electricidad Oriente S.A.
Redes Eléctricas de Centro América S.A.
Comercializadora Guatemalteca Mayorista
de Electricidad S.A.
Distribuidora de Electricidad Occidente S.A.
Advanced Integrated Energy Ltd.
Quantum (2007) LLC
I.C. Green Energy Ltd.
Primus Green Energy Inc.
HelioFocus Ltd.
Heliofocus technologies Ltd.
Heliofocus Hong-Kong Ltd.
Heliofocus Solar Power (Alxa) co., Ltd
ICG Solar 3 Ltd.
ICG Solar 4 Ltd.
ICG Solar 5 Ltd.
Kenon TJ Holdings Pte. Ltd.

Jurisdiction of Incorporation

Name(s) Under Which it Does Business

  Panama
  Panama
  Panama

  Bermuda
Israel

  Cayman Islands
  Nicaragua
  Cayman Islands
  Saint Lucia
  Saint Lucia
  United States

Jamaica
  Saint Lucia
  Guatemala
  Nicaragua
  Cayman Islands
  Panama
  Panama
  Panama
  Guatemala
  Guatemala
  Cayman Islands

Israel

  United States
  United States
  Chile
  Guatemala
  The Netherlands
  The Netherlands
  The Netherlands
  The Netherlands
  The Netherlands
  Guatemala
  Guatemala

  Guatemala
  Guatemala

Israel
  USA
Israel
  USA
Israel
  USA
  China
  China
Israel
Israel
Israel
  Singapore

  Cenérgica Panamá Holdings II S.A.
  Cenérgica Panamá Holdings I S.A.
  PE Panama Energy S.A.

IC Power Holdings (Colombia) Trading

  Limited

I.C. Power Israel Ltd.
IC Power Nicaragua Holdings
IC Power Nicaragua S.A.
IC Power Jamaica Holdings Ltd.
IC Power Jamaica I Ltd.
IC Power Jamaica II Ltd.
IC Power Jamaica Inc.
  Private Power Operator
IC Power Jamaica III
Inversiones Waxere S.A
  Amayo O&M Services S.A.
  Nicaragua Energy Holdings Ltd.
  Centrans Energy Holdings (Amayo) S.A.
  Consorcio Eólico Amayo S.A.
  Arctas Amayo (Fase II S.A.)

IC Power Guatemala Limitada

  Poliwatt Limitada

IC Power Guatemala Holdings Ltd.

  A.G.S. Rotem Ltd.
  Puerto Quetzal Power (PQP) Company

IC Power USA Services Corp.

  Las Codornices S.A.

Inkia Energy Guatemala Ltd.

  Estrella Cooperatief B.A.
  Recsa B.V.
  Guatemel B.V.
  Deorsa B.V.
  Deocsa B.V.
  DEORSA
  RECSA

  Guatemel
  DEOCSA
  Advanced Integrated Energy Ltd.
  Quantum (2007) LLC
IC Green Energy Ltd.
  Primus Green Energy Inc.
  HelioFocus Ltd.
  Heliofocus technologies Ltd.
  Heliofocus Hong-Kong Ltd.
  Heliofocus Solar Power (Alxa) co., Ltd

ICG Solar 3 Ltd.
ICG Solar 4 Ltd.
ICG Solar 5 Ltd.

  Kenon TJ Holdings Pte. Ltd.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 12.1

Certification of the Chief Executive Officer

I, Yoav Doppelt, certify that:

1.

2.

3.

4.

I have reviewed this annual report on Form 20-F of Kenon Holdings Ltd.;

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances
under which such statements were made, not misleading with respect to the period covered by this report;

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and
cash flows of the company as of, and for, the periods presented in this report;

The company's other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and
internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the company and have:

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the

company, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance

regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) Evaluated the effectiveness of the company's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures,

as of the end of the period covered by this report based on such evaluation; and

(d) Disclosed in this report any change in the company's internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is

reasonably likely to materially affect, the company's internal control over financial reporting; and

5.

The company's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the company's auditors and the audit committee
of the company's board of directors (or persons performing the equivalent functions):

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the company's ability

to record, process, summarize and report financial information; and

(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the company's internal control over financial reporting.

Date: April 19, 2017

/s/ Yoav Doppelt

By:
Name: Yoav Doppelt
Title: Chief Executive Officer

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
  
 
 
 
 
Exhibit 12.2

Certification of the Chief Financial Officer

I, Tzahi Goshen, certify that:

1.

2.

3.

4.

I have reviewed this annual report on Form 20-F of Kenon Holdings Ltd.;

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances
under which such statements were made, not misleading with respect to the period covered by this report;

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and
cash flows of the company as of, and for, the periods presented in this report;

The company's other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and
internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the company and have:

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the

company, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance

regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) Evaluated the effectiveness of the company's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures,

as of the end of the period covered by this report based on such evaluation; and

(d) Disclosed in this report any change in the company's internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is

reasonably likely to materially affect, the company's internal control over financial reporting; and

5.

The company's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the company's auditors and the audit committee
of the company's board of directors (or persons performing the equivalent functions):

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the company's ability

to record, process, summarize and report financial information; and

(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the company's internal control over financial reporting.

Date: April 19, 2017

/s/ Tzahi Goshen

By:
Name: Tzahi Goshen
Title: Chief Financial Officer

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
Certification of CEO and CFO Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

In connection with the Annual Report on Form 20-F (the "Report") of Kenon Holdings Ltd. (the "Company") for the fiscal year ended December 31, 2016 as filed with the U.S. Securities and Exchange
Commission (the "SEC") on the date hereof, Yoav Doppelt, as Chief Executive Officer of the Company, and Tzahi Goshen, as Chief Financial Officer of the Company, each hereby certifies, pursuant to
18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that, to the best of his knowledge:

(1)

(2)

The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

Exhibit 13.1

/s/ Yoav Doppelt
Name: Yoav Doppelt
Title: Chief Executive Officer
Date: April 19, 2017

/s/ Tzahi Goshen
Name: Tzahi Goshen
Title: Chief Financial Officer
Date: April 19, 2017

A signed original of this written statement required by Section 906 of the Sarbanes-Oxley Act of 2002 has been provided to the Company and will be retained by the Company and furnished to the SEC
or its staff upon request.

This certification accompanies the Report pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 and shall not, except to the extent required by the Sarbanes-Oxley Act of 2002, be deemed filed by
the Company for purposes of Section 18 of the Securities Exchange Act of 1934.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 15.1

The Board of Directors
Kenon Holdings Ltd.:

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the incorporation by reference in the registration statement on Form S-8 (No. 33 3 -201716) of Kenon Holdings Ltd. of our reports dated April 15, 2017 with respect to the consolidated
statements of financial position of Kenon Holdings Ltd. as at December 3 1, 2016 and 2015, and the related consolidated statements of profit and loss, other comprehensive income (loss), changes in
equity and cash flows for the years then ended, and the effectiveness of internal control over financial reporting as of December 3 1, 2016, which reports appears in the December 31, 2016, annual report
on Form 20-F of Kenon Holdings Ltd.

Sincerely,

KPMG LLP
Public Accountants and
Chartered Accountants

Singapore
April 19, 2017

 
 
 
 
 
 
 
 
 
 
 
Exhibit 15.2

Somekh Chaikin
KPMG Millennium Tower
17 Ha’arba’a Street, PO Box 609
Tel Aviv 61006, Israel
+972 3 684 8000

The Board of Directors 
Kenon Holdings Ltd.:

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the incorporation by reference in the registration statement (No. 333-201716) on Form S-8 of Kenon Holdings Ltd. (hereinafter - “Kenon”) of our report dated March
31, 2015, with respect to the combined carve-out statements of profit and loss, other comprehensive loss, changes in former parent company investment and cash flows for the year
ended December 31, 2014, which report appears in the December 31, 2016 annual report on Form 20-F of Kenon.

/s/ Somekh Chaikin
Certified Public Accountants (Israel)
A Member firm of KPMG International

Tel Aviv, Israel 
April 15, 2017

Somekh Chaikin, an Israeli partnership and a member firm of the KPMG network of independent member 
firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity.

 
 
  
 
 
 
 
 
 
 
 
 
Exhibit 15.3

KPMG Huazhen LLP
50th Floor, Plaza 66
1266 Nanjing West Road
Shanghai 200040
China
Telephone      +86 (21) 2212 2888
Fax                  +86 (21) 6288 1889
Internet          kpmg.com/cn

Consent of Independent Auditor

  : 200040

  +86 (21) 2212 2888

  +86 (21) 6288 1889

  kpmg.com/cn

The Board of Directors 
Qoros Automotive Co., Ltd.:

We consent to the incorporation by reference in the registration statement (No.333-201716) on Form S-8 of Kenon Holdings Ltd. of our report dated 27 March 2017, with respect to the consolidated
statements of financial position of Qoros Automotive Co., Ltd. and its subsidiaries as of 31 December 2016 and 2015, and the related consolidated statements of profit or loss and other comprehensive
income, changes in equity and cash flows for each of the years in the three-year period ended 31 December 2016, which report appears in the 31 December 2016 annual report on Form 20-F of Kenon
Holdings Ltd..

Shanghai, China

18 April 2017

KPMG Huazhen LLP, a People’s Republic of China partnership and
a member firm of the KPMG network of independent member firms
affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity.

We are authorized to practise under the name of KPMG Huazhen
LLP.

 
 
 
 
 
 
  
 
 
 
 
Exhibit 15.4

Deloitte, Inc. 
Contadores Públicos Autorizados 
RUC 16292-152-155203 D.V. 65 
Torre Banco Panamá, piso 12 
Avenida Boulevard y la Rotonda 
Costa del Este, Panamá 
Apartado 0816-01558 
Panamá, Rep. de Panamá 

Teléfono: (507) 303-4100 
Fax: (507) 269-2386 
infopanama@deloitte.com 
www.deloitte.com/pa

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the incorporation by reference in registration statement on Form S-8 (No. 333-201716) of Kenon Holdings Ltd. of our report dated April 13, 2017, appearing in the annual report on Form
20-F  of  Kenon  Holdings  Ltd.,  relating  to  the  Combined  Financial  Statements  of  Distribuidora  de  Electricidad  de  Occidente,  S.A.  (“DEOCSA”)  and  Distribuidora  de  Electricidad  de  Oriente,  S.A.
(“DEORSA”) as of December 31, 2016 and for the year then ended (such Combined Financial Statements are not separately presented in Kenon Holdings Ltd. ’s annual report on Form 20-F), which
report expresses an unqualified opinion and includes explanatory paragraphs referring to (i) the reduction in the capital stock of DEOCSA and DEORSA and (ii) the recoverability of a receivable derived
from the claim with the Guatemalan Tax Authority (Superintendencia de Administración Tributaria).

Panama City, Panama 
April 18, 2017

/s/ Deloitte, Inc.

Deloitte LATCO
Firma miembro de
Deloitte Touche Tohmatsu Limited

 
 
 
 
 
 
 
 
 
 
 
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the incorporation by reference in registration statement No. 333-201716 on form S-8 of Kenon Holdings Ltd. of our report dated March 4, 2015 relating to the consolidated financial
statements of Tower Semiconductor Ltd for the year ended December 31, 2014 (not presented separately herein) included in the annual report of Kenon Holdings Ltd. for the year ended December 31,
2016.

Exhibit 15.5

Sincerely,

Brightman Almagor Zohar & Co

Certified Public Accountants 
A Member of Deloitte Touch Tohmatsu Limited 
Tel Aviv, Israel 
April 19, 2017