Quarterlytics / Basic Materials / Industrial Materials / Solitario Zinc Corp.

Solitario Zinc Corp.

xpl · AMEX Basic Materials
Claim this profile
Ticker xpl
Exchange AMEX
Sector Basic Materials
Industry Industrial Materials
Employees 4
← All annual reports
FY2012 Annual Report · Solitario Zinc Corp.
Sign in to download
Loading PDF…
RT

AL REPO

U
N
N
2 A
1
0
2

SOLITARIO
E X P L O R AT I O N
& R O YA LT Y

BONGARÁ ZINC PROJECT - PERU

MT. HAMILTON GOLD PROJECT - NEVADA

Projects & Properties

World Location Map

Project

Partner (% owned)

2013 Plans - Classification     

Mt. Hamilton
(Gold-Silver, Nevada, US)

Ely Gold (20%)

Bongará
(Zinc, Peru)

Pachuca Norte   
(Silver-Gold, Mexico)

Pedra Branca
(PGM, Brazil) 

Votorantim (max 70%) 

Hochschild (max 70%) 

Anglo Platinum (max 65%) 

Peru Alliance
(Silver-Gold, Cerro Azul, Peru)

Newmont (max 75%)

Yanacocha Royalty NSR-Royalty
(Gold, Peru)

Mercurio
(Gold, Brazil)

NSR-Royalty

Permitting, Drilling, Engineering & 
Metallurgical Studies - Development

Development Work & Drilling
- Pre-feasibility

Exploration & Drilling
- Early-Stage Exploration

Geophysics
- Advanced Exploration

Exploration
- Early-Stage Exploration

Continued Newmont
Exploration, Drilling
- Early-Stage Expl.

Drilling
- Exploration

Gold/Silver

Mt. Hamilton, Nevada

Silver/Gold

Pachuca Norte, Mexico
Cerro Azul, Peru

Zinc

Bongará, Peru

Royalties

Yanacocha, Peru
Mercurio, Brazil

PGM

Pedra Branca, Brazil

2012 Annual Report

Letter to Shareholders - A Year of Milestones

2012 was a landmark year for Solitario.  Our Mt.

In 2013 Votorantim is transitioning from its previous

Hamilton gold project in Nevada advanced

exploration focus to concentrate on development work.

significantly towards construction.  Important

The 2013 work program includes completing another

objectives that were met included:

n In February we completed the Mt. Hamilton

Feasibility Study.

n In June and again in August we secured important

financing for the project.

n In September we added new Seligman resources to

the project.

n In the second half of 2012, we

completed fieldwork necessary to

evaluate the economic viability of

the Seligman resource.

n In November we filed the Mt.

Hamilton Plan of Operations with

the U.S. Forest Service.

We accomplished all this on budget

and only slightly behind our original

schedule.  We are now focused on

completing all permitting activities

necessary to initiate construction at

Mt. Hamilton as soon as possible,

which we believe could be as early as the second half

of 2014.

We are also pleased to report that progress on our

Bongará high-grade zinc project in Peru is

accelerating through the efforts of our joint venture

partner Votorantim Metais.  Votorantim completed its

most aggressive field program in 2012.  Highlights of

this program included:

n Completion of 70 underground drill holes in the

San Jorge mineralized zone.

n An additional 52 surface core holes mainly in the

Karen-Milagros zone.

n Further metallurgical testing on both sulfide and

oxide ores.

n Advancement of the access road to the mine site.

n Continued progress on scoping and pre-feasibility

level economic evaluation.

4.5 kilometers of access road to the mine site, 15,000

meters of underground and surface drilling to further

define mineralization and to provide geotechnical and

hydrologic information in critical areas where infra-

structure is planned.  Permitting is continuing for

future tunneling at both the San Jorge and  Karen-

Milagros zones.  All of this work is necessary to

complete a pre-feasibility study on the

project by the end of 2013, and to

undertake a full feasibility study

beginning in 2014.  

Mt. Hamilton and Bongará are certainly

our two core assets at this time, but

there is more in the pipeline.  We have

a new joint venture partner, Hochschild

Mining plc, on our Pachuca Norte

silver-gold project in central Mexico.

Hochschild is currently planning a 12-

month, $1.5 million exploration

program on this high potential project.

At Pedra Branca, our joint venture

partner, Anglo Platinum, will conduct a regional airborne

geophysical survey to identify new platinum-palladium

targets.  If the survey is successful in identifying new

targets, drilling will follow either in late 2013 or 2014. 

At a time when most junior mining companies are

struggling to maintain even modest programs to

advance their assets, Solitario is aggressively moving

towards development on its Mt. Hamilton gold-silver

project.  Meanwhile, Votorantim Metais, Hochschild

Mining and Anglo Platinum are funding exploration

and development activities on three other important

Solitario projects.  We look forward to updating our

shareholders on all four projects during 2013.

Sincerely,

Christopher E. Herald
President & Chief Executive Officer

Solitario Exploration & Royalty Corp. | 1

Mt. Hamilton Feasibility     2012 Feasibility 
Study Highlights    

Study

Optimized Scenario* 
(Under Review)

Production Rate (Tons/Day)

Mine Life

8,500

8 Years

10,000

10 Years

Gold / Silver Recovery

79% Gold / 90% Sol. Silver 

Same

Life of Mine Stripping Ratio (T=Tons)

2.4 T Waste : 1.0 T Ore

3.0 T Waste : 1.0 T Ore

Initial Capital Cost

Sustaining Capital Cost

Operating Cash Costs (Gold-Eq.)

$72 Million

$35 Million

$575/ounce

$75 Million

$40 Million

$550/ounce

Avg. Annual Gold / Silver Production

48,000 / 330,000 Oz

56,000 / 390,000 Oz

Avg. Annual Gold-Eq. Production**

54,000 Oz

63,500 Oz

* Seligman resource included       ** At a 52:1 silver:gold ratio

In September of 2012, we added the

Seligman deposit to our resource base

for the project.   We also drilled 

53 holes to further define

mineralization, mainly at

Seligman, but also to provide

samples for metallurgical

testing.  As a result of this

work, we are evaluating

the potential to increase

our production rate at

Mt. Hamilton from

8,500 to 10,000

tons per day. 

2 | 2012 Annual Report

Mt. Hamilton Gold Project, Nevada USA - Mt. Hamilton Advances

Significant strides were made in 2012 on our 

overall global resources for the Mt. Hamilton

Mt. Hamilton gold-silver project located in Nevada.

project.  Table 1 shows the Centennial reserves

In February we released the results of a

and resources as well as the Seligman resources.

comprehensive Feasibility Study conducted by

independent and highly regarded SRK Consulting.

With the completion of the Feasibility Study, Solitario

earned an 80% interest in the project.  The Study

demonstrated that Mt. Hamilton represents a platform

capable of delivering solid value to Solitario for years

into the future. 

Feasibility Study Projects Solid Economics

Key economic results of the Feasibility Study include:

2012 Drilling Program & 2013 Metallurgical Testing

In total, 42 reverse circulation drill holes and 11 core

holes were completed in the second half of 2012,

totaling 20,584 feet of drilling.  The 53-hole drilling

campaign was designed to upgrade the newly defined

Seligman inferred resources to measured and

indicated categories.  Additionally, sample material

was obtained to carry out metallurgical and

geochemical testing and to measure geotechnical

characteristics for mine planning at Seligman.  Several

n Average Life-of-Mine operating cash cost of $575

holes were also drilled at the Centennial gold deposit

per gold equivalent ounce produced.

n Average annual Life-of-Mine gold equivalent

production of 54,000 ounces.

n Initial capital of approximately $72 million;

sustaining capital $35 million.

n NPV = $198.5 million (5% discount rate; pre-tax 

at $1,500 gold and $29.00 silver).

n Excellent potential to add new resources adjacent

to the currently established reserves.

Importantly, the Feasibility Study only consid-

ered mining and processing ores delivered from

the Centennial deposit.  However, in September

to convert inferred resources to measured and

indicated categories as well as to test potential

extensions of mineralization to the south.  Table 1

provides highlights of our drilling program.

We are now incorporating the information gathered in

the 2012 drilling program to update resource

estimates for both the Centennial and Seligman

deposit.  Metallurgical testing at an independent

laboratory is underway with results expected in the

third quarter of 2013.  We believe there is a strong

potential to increase the production rate by 15-20%

and extend the mine life from approximately eight

2012, SRK 

completed an 

NI 43-101 

compliant mineral

resource estimate

for the Seligman

mineralization that

lies only 1,500

feet north of the

Centennial

deposit.  As a

result, a 39%

increase in Indi-

cated Resources

contributed to the

Table 1:  2012 Drilling Highlights - Mt. Hamilton 

Drill Hole 1
(Deposit)
MH-12-04 (S)
MH-12-07 (C)
MH-12-10 (C)
MH-12-12 (S) 4
MH-12-15 (S)
MH-12-18 (C)
MH-12-22 (S)

MH-12-26 (S)
MH-12-35 (S) 4
MH-12-48 (S)
MH-12-49 (S)
MH-12-51 (S)

Starting at
(feet)
130
340
425
6
120
575
0
65
110
0
259
305
320
265

Interval 2
(feet/m)
70 / 21.3
120 / 36.6
125 / 38.1
108.3 / 33.0
80.0 / 24.4
60 / 18.3
40 / 12.2
30 / 9.1
20 / 6.1
145 / 44.2
113.2 / 34.5
75 / 22.9
65 / 19.8
90 / 27.4

Gold
(gpt)
0.50
1.46
1.82
0.75
0.80
1.00
0.63
1.04
0.66
0.67
0.74
0.63
1.12
0.95

Silver
(gpt)
11.73
11.44
18.54
2.08
20.66
24.25
1.85
0.73
1.45
1.01
3.20  
19.56
7.21
10.77

Gold Eq. 3
(gpt)
0.71
1.67
2.16
0.79
1.18
1.44
0.66
1.05
0.69
0.69
0.80
0.99
1.25
1.15

1 (C)= Centennial; (S)=Seligman.
2 True width is estimated to be approximately 80% of true width for most intervals.
3 Gold Equivalent = gold grade + (silver grade ÷ 55).
4 Core hole; all other reported holes in this chart are reverse circulation drill holes.

years to ten years,

without the

addition of

significant new

capital costs 

(see chart on

opposite page).

Permitting
Underway

In November of

2012, we filed a

Plan of Operations

with the United

States Forest

Solitario Exploration & Royalty Corp. | 3

Mt. Hamilton Gold Project, Nevada USA - continued

Service to mine and process both the Centennial and

1990’s.  Approximately 2,000 soil samples were

Seligman deposits.  In March 2013, the Plan of

collected over much of the existing land package that

Operations was deemed complete and the process to

Solitario controls.  The geochemical survey indicated a

obtain both federal and state permits is ongoing.  It is

large zone of soils containing strongly anomalous gold

always difficult to estimate the time frame required to

and trace element geochemistry.  The rock formations

obtain all permits needed to initiate project

and associated rock alteration underlying the soil

construction, but we are hopeful that such approvals

anomaly are similar to the underlying rock formations

will be forthcoming by mid-2014.

and alteration observed at the Centennial and

Seligman deposits.

We believe our mine plan is

well conceived from an

environmental standpoint to

minimize environmental

impacts on federal lands.

Significant past disturbance

exists on much of the

project area where mining

occurred in the mid-1990’s.

Our processing facilities are

located on private property

that we own and all of our

planned mining is situated

above the groundwater

table.  Because we are using

a vertical ore pass and an

underground conveyor

system to deliver ore from

the pit to the processing

facilities, we reduce the

amount of dust and carbon

emissions associated with

hauling the ore from the pit

to the heap leach pad.   These innovative design

elements are not only good for the environment, but

also are cost effective and should help expedite our

permitting timeline.

Wheeler Ridge Exploration Program

Based on the coincident favorable soil geochemistry

and geology observed at Wheeler Ridge, Solitario

initiated an Environmental Assessment study to

allow for drill testing the Wheeler Ridge zone.  

The permitting process to allow for drill testing the

The Wheeler Ridge area located immediately south of

Wheeler Ridge zone is nearing completion.  We

the Centennial ore deposit represents a significant new

hope to have approval to drill at Wheeler Ridge by

gold exploration target that is essentially untested by

mid-year.  Upon approval, Solitario is planning 

drilling.   In 2011 we found a soil geochemistry map

an initial 15-hole program to drill test this 

apparently lost in project files dating back to the mid-

large anomaly.

4 | 2012 Annual Report

Bongará Zinc Project, Peru - Development Stays On Track

Table 2:  2012 Drilling Highlights - San Jorge Zone 

(all underground core holes)

Drill Hole
Number
V-245 
V-246

V-255     
V-257
V-258

V-270

V-278
V-292
V-297
V-298
and
V-299
V-300
and
V-301
V-302
V-354
and

Intercept 1
(meters)
5.8
9.4
3.2
15.5
31.4
5.7
22.9
20.8
14.6
22.1
22.2
56.6
7.4
6.5
7.7
14.5
8.7
15.4
16.9
11.2
11.8

Zinc
(%)
21.52
7.33
20.32
12.42
9.75
12.54
11.76
10.14
11.33
8.72
12.45
22.69
40.05
14.75
19.03
26.57
12.87
22.81
19.16
11.62
11.87

Lead
(%)
15.09
0.83
3.58
4.79
1.11
1.70
0.84
0.31
0.02
2.28
0.97
1.15
3.68
2.50
2.80
2.15
1.41
0.40
0.98
0.09
0.48

1 True thickness has not been estimated for each individual intercept.

Silver
(gpt)
53.48
7.35
28.11
41.94
31.40
25.28
14.07
10.32
5.90
17.73
17.23
31.23
58.99
20.90
30.26
29.46
11.14
35.00
31.12
12.73
10.10

Based on these

results, Votorantim

has proposed

extending the San

Jorge exploration

tunnel a further 300

meters to the south

where high-grade

mineralization

remains wide open.  

The Karen-Milagros

zone was the focal

point of surface

drilling in 2012.

Fifty core holes were

completed in the

Karen-Milagros zone

in 2012 and three

Progress was made

on a variety of fronts

on our Bongará

high-grade zinc

project in Peru.

Detailed drilling

was conducted on

both the San Jorge

and Karen-Milagros

zones. Among the

more important

activities during

2012 were metal-

lurgical testing,

geotechnical testing

related to

underground min-

ing, resource

modeling,

infrastructure scoping studies and permitting.  

Another Year of Exceptional Drilling Results
Underground drilling on the San Jorge zone and

surface holes in the San Jorge zone.   Remarkably, 46

of the 53 drill holes intersected mineralization grading

in excess of 2.0% zinc + lead over at least two meters,

or equivalent.  The Karen-Milagros zone is open to

surface drilling on the Karen-Milagros zone yielded

expansion to the northeast and also to the south

exceptional assay results.  Drilling at San Jorge began

towards the San Jorge zone.  The spatial relationship

in the fourth quarter of 2011 and was completed by the

between the San Jorge and Karen Milagros zones is

third quarter of 2012.  During this period 70 core holes

shown in the illustration below.  Highlights of the

totaling 12,342 meters were completed from eight

Karen-Milagros surface drilling program are presented

different underground drill stations.  Highlights of the

in Table 3 on page seven. 

underground drilling program are

presented in Table 2 above.  

The San Jorge mineralized area,

and the Florida Canyon deposit

in general, remain open to

expansion in all directions.  Of

particular importance is the

discovery that zinc grades at San

Jorge increase to the south.  In

fact, the southernmost area tested

by the underground drilling

program contains some of the

highest zinc grades ever

encountered on the property.

Solitario Exploration & Royalty Corp. | 5

Worldwide Zinc Consumption

23% Transportation

1 0 %   M a c h i n e r y
1

0 %   D

b le s

u r a

9%
Infrastructure

49%
Construction

Although worldwide zinc production is currently in

surplus, resulting in a moderately subdued zinc

price in the range of $0.80 to $1.00 per pound,

many base metal commodity experts are

calling for a significant change in the supply

profile over the next couple of years.

Specifically, nine medium to large zinc

mines are slated for closure in 2013-

2014, resulting in nearly a 20%

reduction in zinc supply, with

demand forecast to increase.

This situation is setting the

stage for a potentially

explosive market

increase for the price

of zinc in 2014 

and beyond.

6 | 2012 Annual Report

Bongará Zinc Project, Peru - continued

Development Activities

Engineering and other development activities were in

full swing in 2012.  Another substantial metallurgical

study was completed by our partner and demonstrated

excellent metallurgical recovery averaging 93% for

zinc.  Additional permitting was undertaken to allow

completion of the access road to the Florida Canyon

area.  To date, approximately 50% of the 40-kilometer

long access road has been completed.  

2013 Plans - Transition from Exploration to Development

Votorantim plans on constructing approximately 4.5

additional kilometers of access road, with the balance

of road construction slated for completion in 2014,

representing a project milestone that will facilitate

future project development.  They also hope to

complete permitting for a further 300 meters of tunnel

at the southern end of the San Jorge zone, where

exceptionally high-grade zinc was encountered, and

studies will be undertaken as part of Votorantim’s

effort to complete a pre-feasibility study by the end of

2013 and to initiate a full feasibility study in early

2014.  Permitting and community engagement

initiatives will continue to be one of the highest

priorities for the project.   

Our Agreement with Votorantim Metais

We must stress that the cornerstone of our agreement

with Votorantim Metais is that we are 100% funded

through commencement of commercial production by

Votorantim.   In fact, all funds expended by Votorantim

through completion of a feasibility study are 100%

Votorantim’s obligation, with no repayment required 

by Solitario.  Considering the difficult resource

financing environment that we have experienced for

the past 18 months, it is becoming unquestionably

clear that our underlying agreement with Votorantim

makes this great project even better for Solitario and

for 700 meters of new tunnel in the Karen-Milagros

its shareholders.  

zone.  These tunnels will be utilized to conduct

detailed underground drilling to establish proven and

probable reserves.  

Another 15,000 meters of underground and surface

drilling will be completed to further define

mineralization and to provide geotechnical and

hydrologic information in critical areas where

infrastructure is planned, particularly at the proposed

tailings impoundment site.  The geotechnical and

Votorantim has the option to earn up to a 70% interest

in the project by committing to place the project into

production based upon a feasibility study.  Solitario

does not have to pay back Votorantim for any of its

expenditures before completing a feasibility study and

a production decision.  After a production decision is

made, Votorantim is required to finance Solitario's

30% participating interest for construction.  Solitario

will repay the loan facility through 50% of its net cash

hydrologic drilling will be incorporated into advanced

flow distributions.  

engineering studies

for both pre-

feasibility and

feasibility purposes.

Resource modeling

is also well

underway to

incorporate 2012

drilling into our new

resource estimates.

A variety of

engineering related

Table 3:  2012 Drilling Highlights - Karen-Milagros Zone

(all underground core holes) 

Drill Hole
Number
V-287
V-288
V-325
V-330
V-333
and
V-334
V-350
V-351
V-368

Intercept 1
(meters)
7.9
5.4
9.0
12.6
11.0
7.7
4.8
8.6
13.0
5.6

Zinc
(%)
24.56
17.71
11.06
8.99
8.41
12.57
24.67
7.10
12.94
11.61

Lead
(%)
2.69
6.04
1.18
1.91
0.86
9.33
5.45
4.13
4.31
3.84

Silver
(gpt)
30.51
49.12
12.71
12.28
6.05
7.70
42.35
28.35
32.37
23.84

1 True thickness has not been estimated for each individual intercept.

Solitario Exploration & Royalty Corp. | 7

Pachuca Norte - An Exciting New Joint Venture       Pedra Branca - A Search for New Targets Underway

Pachuca Norte Silver-Gold Project, Mexico
Solitario's Pachuca Norte project (formerly called

Pachuca Real) is encompassed in the famed Pachuca

silver-gold mining district where approximately 1.4

billion ounces of silver and over 7.0 million ounces of

gold were produced, making it one of the largest

historic silver-gold districts in the world.

In March 2013 we signed a binding Letter Agreement

with Hochschild Mining plc on this high-potential silver-

gold property in central Mexico.  Hochschild Mining is a

leading Latin American precious metals company with a

primary focus on the exploration, mining, processing and

sale of silver and gold.  Hochschild has almost fifty

years’ experience in mining precious metal epithermal

vein deposits and currently operates four underground

epithermal vein mines, three located in southern Peru

Upon completion of the feasibility study, both companies

will fund their respective participating interests.

Hochschild will be the project manager.

We have always been excited about the potential of

our Pachuca Norte project, and with Hochschild as

our new partner, we believe our efforts will be

rewarded as the project advances with an aggressive

new drilling program.  Past exploration by our former

partners has laid substantial groundwork for

Hochschild to move rapidly forward, offsetting

previously drilled holes that are strongly mineralized.

The 15 best drill hole intercepts from 10 separate

prospect areas are presented in Table 4 below.  

Pedra Branca PGM Project, Brazil
The platinum-palladium market has once again

ignited with potential

global shortages of

Ag Eq. 3

both these strategic

and one in southern

Argentina, with a

growing presence in

Mexico.  We believe

Hochschild is an ideal

fit to advance our

Pachuca Norte

project.   

The joint venture

emphasizes

progressively

accelerating work

commitments from a

firm initial work

commitment of $1.5

million over the first

12 months.  General

terms are as follows:

Table 4:  Drilling Highlights - Pachuca Norte
Silver
Drill Hole 1 From To Width 2 Gold
(gpt)
(gpt)
2.03 754.00

266.40 267.30

Pac-08  (N)

0.90

Vein

San Juan Gallo

El Escribano

Pac-09  (N)

245.00 245.50

Investagadora

Pac-11  (N)

314.40 315.30

San Juan Gallo

Pac-13  (N)

156.90 158.90

El Escribano

Pac-18  (N)

274.70 276.10

Investigadora

Pan-11-12  (B) 217.75 218.60

Investigadora

Pan-11-18  (B) 236.25 237.00

San Marcial

Pan-11-19  (B) 225.15 225.60

La Perla

Santa Rosa

Santa Rosa

Pan-11-22  (B) 344.90 345.90

Pan-11-25  (B) 252.60 255.00

Pan-11-27  (B) 144.90 145.50

Sumbimblia

Pan-11-28  (B) 46.30 47.35

Escribano Norte Pan-11-29  (B) 444.45 445.05

Escondida

Pan-11-31  (B) 250.30 251.15

Escribano Sur 

Pan-11-34  (B) 238.85 240.40

0.50

0.85

1.95

1.40

0.85

0.75

0.45

1.00

2.40

0.60

1.05

0.60

0.85

1.55

0.75 468.00

1.28 173.00

0.63 144.70

1.00 458.40

1.95 271.47

0.97 317.00

0.75 657.00

6.30

53.48

1.43 158.27

5.60 837.00

16.40 238.86

2.60 834.00

8.40 283.00

0.90 165.00

856

506

237

176

508

369

365

695

368

230

1,117

1,058

964

703

210

1 (N) = Newmont drilled core hole; (B) = Buenaventura drilled core hole.  
2 True widths of veins have not been estimated and could be substantially less than reported. 
3 Ag Eq. = Silver Equivalent at 1.0 g/gold = 50 g/silver.

metals forecast by

many commodity

analysts.  This has

raised the profile on

our Pedra Branca

project.  

In 2012 Anglo

Platinum, our 51%

joint venture partner

and largest platinum

producer in the world,

assumed management

of the project from

Solitario and is now

funding and

n First 18 months – $2.0 million in expenditures
n Second 18 months – $3.0 million in expenditures
n Final 24 months – $5.0 million in expenditures

Hochschild will earn a 51% interest in the project upon

completion of the aforementioned 60-month, $10.0

million work commitment.  Hochschild will have the

right to earn an additional 19% interest (total 70%) by

completing a positive feasibility study on the project.

8 | 2012 Annual Report

managing all exploration activities on the project.

Current plans call for a regional airborne geophysical

survey designed to identify magnetic ultramafic rock

formations.   Ultramafic rocks are iron-magnesium rich

with a very high magnetic geophysical signature, and
commonly host platinum-palladium mineralization in

the Pedra Branca area.   If the geophysical program is

successful in identifying new magnetic bodies, drilling

is anticipated in late 2013 or 2014.

Management’s Discussion & Analysis | of Financial Condition & Results of Operations

The following discussion should be read in conjunction with the in-
formation contained in the Consolidated Financial Statements and
Notes thereto included in this Annual Report.  Our financial con-
dition and results of operations are not necessarily indicative of
what may be expected in future years.  

(a). Business Overview and Summary

We are a development stage company (prior to February 22, 2012
we were an exploration stage company) with a focus on developing
the Mt. Hamilton gold project,  the acquisition of precious and base
metal properties with exploration potential, and the development
or purchase of royalty interests.  We announced on February 22,
2012 the completion of a feasibility study on our Mt. Hamilton proj-
ect (the “Feasibility Study”), prepared by SRK Consulting (US),
Inc. of Lakewood, Colorado (“SRK”).  As a result of the completion
of the Feasibility Study, we have earned an 80% interest in the Mt.
Hamilton project and intend to develop the Mt. Hamilton project,
subject to a number of factors including obtaining necessary permits
and availability of required capital, none of which is currently in
place.  The Mt. Hamilton project is discussed below under “Ely
Gold Investment and the Mt. Hamilton Joint Venture.”  In addition,
we acquire and hold a portfolio of exploration properties for future
sale, joint venture or to create a royalty prior to the establishment
of proven and probable reserves.  Although our mineral properties
may be developed in the future by us or through a joint venture,
and we currently intend to develop the Mt. Hamilton project, we
have never developed a mineral property.  We may also evaluate
mineral properties to potentially buy a royalty.

Solitario was incorporated in the state of Colorado on November 15,
1984 as a wholly owned subsidiary of Crown Resources Corpora-
tion.  We have been actively involved in this business since 1993.
We recorded revenues from joint venture delay rental payments re-
lated to our Bongará project of $200,000, each year, during 2012
and 2011and we recorded $100,000 and $42,000, respectively, in
delay rental property payments during 2012 and 2011 related on
our Mercurio project.  During June 2012 we sold a royalty interest
in our Mt. Hamilton project to Sandstorm Gold Ltd. (“Sandstorm”)
for $10,000,000 of which $6,000,000 was paid in June 2012 and
$4,000,000 was paid in January 2013.  Previously, our last signif-
icant revenues were recorded in 2000 upon the sale of our Yana-
cocha property for $6,000,000.  We expect that future revenues from
the sale of properties, if any, would also occur on an infrequent
basis.  At December 31, 2012, in addition to our Mt. Hamilton proj-
ect, we had nine exploration properties in Peru, Mexico and Brazil,
and one royalty property in each of Peru and Brazil.  We are con-
ducting exploration activities in all of those countries either on our
own or through joint ventures operated by our partners. 

In addition to our work at Mt. Hamilton, we have expertise in iden-
tifying mineral properties with promising mineral potential, ac-
quiring these exploration mineral properties and exploring them
to enable us to sell, joint venture or create a royalty on these prop-
erties prior to the establishment of proven and probable reserves.
For these early-stage projects, one of our primary goals is to dis-
cover economic deposits on our mineral properties and advance
these deposits, either on our own or through joint ventures, up to
the development stage (development activities include, among
other things, the completion of a feasibility study for the identifi-
cation of proven and probable reserves, as well as permitting and
preparing a deposit for mining).  At that point, or sometime prior
to that point, we would attempt to either sell our exploration min-
eral properties, pursue their development either on our own or
through a joint venture with a partner that has expertise in mining
operations or create a royalty with a third party that continues to
advance the property.  

In analyzing our activities, the most significant aspect relates to
results of our exploration and potential development activities and
those of our joint venture partners on a property-by-property basis.
When our exploration or development activities, including drilling,
sampling and geologic testing, indicate a project may not be eco-
nomic or contain sufficient geologic or economic potential we may
impair or completely write-off the property.  Another significant
factor in the success or failure of our activities is the price of com-
modities.  For example, when the price of gold is up, the value of
gold-bearing mineral properties increases; however, it also be-
comes more difficult and expensive to locate and acquire new gold-
bearing  mineral  properties  with  potential  to  have  economic
deposits.   We anticipate the success of our development activities
on our Mt. Hamilton property will become increasingly important
in the future.  

The potential sale, joint venture or development of our mineral
properties will occur, if at all, on an infrequent basis.  Accordingly,
while we conduct development activities at the Mt. Hamilton proj-
ect, we need to maintain and replenish our capital resources.  We
have met our need for capital in the past through (i) the sale of prop-
erties, which last occurred in 2000 with the sale of our Yanacocha
property for $6,000,000; (ii) joint venture payments, including delay
rental payments of $200,000, received each year for 2012 and 2011
on our Bongará property and delay rental payments of $100,000
and $50,000, respectively, on our Mercurio project in Brazil; (iii) the
Sandstorm royalty sale during 2012; (iv) the sale of our investment
in Kinross common stock; (v) borrowing against our RMB Facility
Agreement; (vi) short-term margin borrowing secured by our invest-
ment in Kinross common stock; and (vii) issuance of common stock,
including exercise of options.  We have reduced our exposure to the

Solitario Exploration & Royalty Corp. | 9

Management’s Discussion & Analysis | continued

costs of our exploration activities in the past through the use of joint

ventures; however, we do not have any current plans to further joint

venture Mt. Hamilton.    Although we anticipate these practices will

continue for the foreseeable future, we can provide no assurance

that these sources of capital will be available in sufficient amounts

to meet our needs, if at all.

(b). Recent Developments 
Feasibility Study

On February 22, 2012, we announced the completion of the Feasi-
bility Study, and as a result we earned an 80% interest in MH-LLC,
and became a development stage company (but not a company in
the “Development Stage”) and we reported the following mineral
reserves at our Mt. Hamilton project:

Mineral Reserves Statement, Centennial Gold-Silver Deposit, White Pine County, Nevada - SRK Consulting (Inc.)
Contained 
Contained 
Gold (koz)** Silver (koz)**

Silver Grade*

Gold Grade

Reserve Category
Proven
Probable
Proven + Probable
*Reported silver grade is cyanide soluble. **Some numbers may not add due to rounding.

g/tonne
1.10
0.72
0.75

oz/ton
0.155
0.134
0.136

oz/ton
0.032
0.021
0.022

g/tonne
5.31
4.59
4.66

Tons
(millions)
0.923
21.604
22.527

29.3
457.8
487.1

142.7
2,884.3
3,028.2

RMB Facility Agreement

As explained in more detail in Note 4, “Long-term Debt” to our Con-
solidated Financial Statements, we entered into a Facility Agree-
ment  (the  “Facility  Agreement”)  with  RMB  Australia  Holdings
Limited, an Australian corporation (“RMBAH”), and RMB Re-
sources Inc., a Delaware corporation (“RMBR”) whereby we may
borrow up to $5,000,000 from RMBAH (with any amounts outstand-
ing collectively being the “RMB Loan”).  We borrowed $1,500,000
on August 21, 2012.  We paid an arrangement fee of $250,000 upon
initial funding.  The RMB Loan matures on the earlier to occur of (i)
36 months from the date of initial funding or (ii) the date on which
financing is made available to MH-LLC for purposes of placing the
Mt. Hamilton project into commercial production.  The RMB Loan
amounts bear interest at the 90-day LIBOR rate plus 5%, payable
in arrears on the last day of each quarterly interest period.  The RMB
Loan may be repaid at any time without penalty.  Any amounts re-
paid may not be redrawn under the Facility Agreement.  The RMB
Loan is secured by a lien on our 80% interest in MH-LLC as well as
a general security interest in our remaining assets.

RMB Warrants

Pursuant to the Facility Agreement, we issued 1,624,748 warrants
(the “RMB Warrants”) to RMBAH as partial consideration for fi-
nancing services provided in connection with the Facility Agree-
ment. Each RMB Warrant entitles the holder to purchase one
share of our common stock (the “Warrant Shares”) pursuant to the
terms and conditions of the RMB Warrants. The RMB Warrants
expire 36 months from their date of issuance and have an exercise
price of $1.5387 per Warrant Share, subject to customary anti-di-
lution adjustments.   

Sandstorm Royalty Sale

On June 11, 2012, MH-LLC completed the sale of a 2.4% net
smelter returns royalty (“NSR”) on the Mt. Hamilton project to
Sandstorm for US$10,000,000.  MH-LLC received an upfront pay-

ment of US$6,000,000 upon signing the agreement and received
US$4,000,000 on January 15, 2013, which we have recorded as a
current asset as of December 31, 2012.  As part of the agreement,
MH-LLC will have the option, for a period of 30 months from June
11, 2012 to repurchase up to 100% of the NSR for US$12,000,000,
provided that MH-LLC enters into a gold stream agreement with
Sandstorm  that  has  an  upfront  deposit  of  greater  than
US$30,000,000. In addition, MH-LLC has provided Sandstorm
with a right of first refusal on any future royalty or gold stream fi-
nancing for the Mt. Hamilton project.   Pursuant to the agreement,
we are jointly and severally liable for all obligations of MH-LLC to
Sandstorm.  See Note 2, “Mineral Properties” to our Consolidated
Financial Statements below for further discussion of the Sandstorm
royalty sale.

Investment in Kinross

We have a significant investment in Kinross at December 31, 2012,
which consists of 670,000 shares of Kinross common stock.   Dur-
ing 2012 and 2011, we sold 180,000 and 130,000 shares, respec-
tively, of Kinross common stock for proceeds of $1,591,000 and
$2,035,000.  As of February 28, 2013, we own 670,000 shares of
Kinross common stock.  Our investment in Kinross common stock
represents a significant concentration of risk and any significant
fluctuation in the market value of Kinross common shares could
have a material impact on our liquidity and capital resources.  As
of December 31, 2012 we have sold one covered call option cover-
ing 50,000 shares of Kinross stock whereby the holder could pur-
chase the shares at $12.00 per share, which expired unexercised in
February 2013.  The Kinross call option is discussed below under
Note 6, “Derivative Instruments” to our Consolidated Financial
Statements.    As  of  December  31,  2012,  we  have  borrowed
$1,500,000 in a margin loan against its holdings of Kinross shares.
The  short-term  margin  loan  is  discussed  below  under  Note  3,
“Short-term Debt” to our Consolidated Financial Statements. 

10 | 2012 Annual Report

Management’s Discussion & Analysis | continued

Mineral Property

Solitario began capitalizing its development costs incurred at its
Mt. Hamilton project subsequent to the completion of the Feasibil-
ity Study.  During 2012, Solitario capitalized $3,129,000 of devel-
opment costs, $325,000 of payments on mineral properties, and
$300,000 of advance royalty payments to an underlying leaseholder
as long-term other assets at the Mt. Hamilton project.  See Note 2,
“Mineral Properties” to our Consolidated Financial Statements
below for further discussion of the Mt. Hamilton project.

Stock Option Liability – Change in Accounting Principle 

On January 1, 2011, we changed our accounting for stock options
to equity accounting from liability accounting in accordance with
ASU 2010-13.   This change in accounting principle has been made
on a prospective basis as of January 1, 2011 with a reduction to
stock option liability of $2,775,000, an increase to additional paid-
in-capital of $1,240,000 and a reduction in accumulated deficit of
$992,000, net of deferred taxes of $543,000.   The newly adopted
accounting principle is preferable because it improves consistency
in financial reporting by eliminating diversity in accounting prac-
tice.  See Note 9, “Employee Stock Compensation Plans” to our
Consolidated Financial Statements.”   

(c). Results of Operations
Comparison of the year ended December 31, 2012
to the year ended December 31, 2011

We had a net loss of $3,297,000 or $0.10 per basic and diluted
share for the year ended December 31, 2012 compared to a net
loss of $3,377,000 or $0.10 per basic and diluted share for the
year ended December 31, 2011.  As explained in more detail
below, the primary reasons for the decrease in net loss during 2012
compared to the net loss during 2011 were (i) a decrease in explo-
ration costs to $301,000 on our Mt. Hamilton project compared to
$3,700,000 during 2011; (ii) a decrease in other exploration ex-
pense to $1,685,000 during 2012 compared to $2,246,000 during
2011 and (iii) a decrease in our non-stock option general and ad-
ministrative  expense  to  $1,948,000  during  2012  compared  to
$2,160,000 during 2011.  Partially offsetting these decreases in
costs were (i) a loss on warrant liability of $488,000 during 2012;
(ii) an increase in our interest expense, net of $318,000 during
2012 compared to interest expense, net of  $163,000 during 2011;
(iii) a decrease in the credit for net loss attributable to noncontrol-
ling interest to $301,000 during 2012 compared to a credit of
$3,591,000 during 2011 and (iv) a decrease in the gain on sale of
marketable equity securities to $1,528,000 during 2012 compared
to $1,937,000 during 2011.  Each of these items is discussed in
greater detail below.  

Our primary activities during 2012 and 2011 have been the (i) ex-
ploration and development activities to advance the Mt. Hamilton
property toward future production, (ii) exploration on our mineral
properties to delineate deposits to enable us to sell or joint venture
the mineral properties and (iii) reconnaissance exploration to lo-
cate and acquire new mineral properties.  During 2012 we in-
creased our development efforts related to our Mt. Hamilton project
and spent $3,730,000 in direct development costs, of which we cap-
italized $3,129,000 of mineral property development costs, dis-
cussed above and capitalized a $300,000 advance royalty payment.
During 2011 we incurred $3,700,000 including $3,400,000 in di-
rect exploration expenditures and a $300,000 advance royalty pay-
ment,  all  of  which  were  expensed  as  incurred  related  to  Mt.
Hamilton.  We recorded a credit of $301,000 and $3,591,000, re-
spectively, during 2012 and 2011 for DHI-US’s noncontrolling in-
terest in the expenditures of MH-LLC, related to our expenditures
prior to the SRK feasibility study, which were included in our state-
ment of operations.  We decreased our exploration expenditures at
our  South  American  and  Mexico  properties  to  $1,686,000  and
$2,246,000, respectively, in 2012 and 2011 as a result of a shift in
our focus to the Mt. Hamilton project.  During 2012 we completed
a drilling campaign at our Jaripo project in Mexico and during 2011
we completed a drilling program at our Cerro Azul project in Peru.
In addition we capitalized $3,000 for initial acquisition costs at our
Canta  Colorado  property  in  Peru  compared  to  capitalization  of
$10,000 related to our Jaripo and Aconchi properties in Mexico.  

Our 2013 exploration and development expenditure budget is ap-
proximately $3,439,000, which includes approximately $2,043,000
for development costs related to Mt. Hamilton.  In addition we antic-
ipate we will spend approximately $1,625,000 for payments on leases
to landowners, advance minimum royalty payments and payments to
DHI-US pursuant to the MH Agreement.  The primary factor in the
reduction in Mt. Hamilton exploration and development expenditures
from 2012 to 2013 relates to the completion of our Feasibility Study
and related activities, including drilling and engineering design work,
which occurred during 2012, and which will not be a significant part
of our planned activities during 2013.  Our planned activities during
2013 relate to our intention to move the Mt. Hamilton project substan-
tially through development activities including permitting, seeking
financing for the capital required to build the project and other engi-
neering and project management.  The future construction of Mt.
Hamilton will be dependent on a number of factors including receiv-
ing permits and obtaining financing for construction, none of which
is currently in place.  We cannot predict with certainty that we will
be successful in achieving any of these goals.  In addition we plan to
continue to perform our early-stage planned exploration activities on
our other properties and to continue reconnaissance exploration ac-
tivities to acquire new properties.  These exploration activities may

Solitario Exploration & Royalty Corp. | 11

Management’s Discussion & Analysis | continued

also be modified, as necessary for changes, in joint venture funding,
commodity prices and access to capital.   

Exploration expense (in thousands) by property consisted of the fol-
lowing:

$

Property Name

Mt. Hamilton
Jaripo
Cerro Azul
Pachuca
Espanola
La Promesa
Canta Colorado
Mercurio
Atico
Norcan
Triunfo
Pedra Branca, net
Cajatambo
Chonta
Newmont Alliance 
Excelsior
Bongará
Reconnaissance

Total exploration expense

$

2012 

2011 

301 
247 
99 
32 
22 
19 
17 
9 
4 
2 
1 
(30)
-   
-   
-   
-   
-   
1,263 
1,986 

$

$

3,700 
26 
715 
2 
24 
17 
-   
15 
-   
3 
1 
(50)
7 
4 
4 
3 
3 
1,472 
5,946 

We recorded a credit (reduction of expense) of $301,000 and
$3,591,000, respectively, during 2012 and 2011 for DHI-US’s
noncontrolling interest in the losses of MH-LLC.  The significant
decrease during 2012 related to the capitalization of development
cost of $3,129,000 and our earning an 80% interest in MH-LLC
as a result of the completion of the Feasibility Study, discussed
above.  During 2012 and 2011 we recorded management fees of
$30,000 and $50,000, respectively, to PBM as a credit to explo-
ration expense.  

We believe a discussion of our general and administrative costs
should be viewed without the non-cash stock option compensation
expense which is discussed below.  Excluding these costs, general
and administrative costs were $1,948,000 during 2012 compared to
$2,160,000 during 2011.  We incurred salary and benefits expense
of $1,008,000 during 2012 compared to $1,207,000 during 2011,
which decreased as a result of the capitalization to Mt. Hamilton
property of certain salary costs during 2012.  We also reduced legal
and  accounting  costs  to  $224,000  during  2012  compared  to
$305,000 during 2011 due to the legal and accounting work during
2011 associated with setting up the administration of MH-LLC and
land matters at Mt. Hamilton and the Royalty Buy-down, while dur-
ing 2012 legal costs associated with the RMB Loan of $328,000

12 | 2012 Annual Report

were capitalized.  These decreases were mitigated by an increase in
our shareholder relations costs to $397,000 during 2012 compared
to $318,000 during 2011.  We anticipate general and administra-
tive costs for 2013 will be comparable to the costs incurred during
2012 as we expect less activity with regard to Mt. Hamilton and our
South American operations will be offset by an increase in share-
holder relations costs during 2013.  We have forecast 2013 general
and administrative costs to be approximately $1,941,000, exclud-
ing non-cash stock option compensation expense.   

We account for our employee stock options under the provisions of
ASC 718.  Beginning in January 1, 2011, we recognize stock option
compensation expense on the date of grant for 25% of the grant date
fair value, and subsequently, based upon a straight line amortiza-
tion of the grant date fair value of each of its outstanding options.
During the year ended December 31, 2012, we recorded $732,000
of non-cash stock option expense for the amortization of grant date
fair value with a credit to additional paid-in-capital compared to
$697,000 of non-cash stock option compensation expense during
2011.   Prior to January 1, 2011, Solitario recorded a stock option
liability for the vested fair value of each option grant on the meas-
urement date by multiplying the estimated fair value determined
using the Black-Scholes model by the percentage vested on the
measurement date  See Note 9, “Employee Stock Compensation
Plans” to our Consolidated Financial Statements for an analysis of
the changes in the fair value of our outstanding stock options and
the components that are used to determine the fair value.  

During  2012  we  recorded  a  loss  on  derivative  instruments  of
$30,000 compared to a loss of $137,000 during 2011. The decrease
in the loss was primarily related to a reduction in unrealized loss on
our investment in Ely warrants of $74,000 during 2012 compared
to $180,000 during 2011. The Ely warrants expired unexercised
which resulted in the loss during 2012 and prior to that, during
2011, the change in value in the Ely warrants was determined using
a Black-Scholes option pricing model and was highly dependent
on the change in the price of Ely’s common stock which declined
from Cdn$0.30 per share at December 31, 2010 to Cdn$0.18 per
share at December 31, 2011.  These losses were partially mitigated
by gains on Kinross calls we sold during 2012 and 2011 of $48,000
and $42,000, respectively.  We have sold covered calls on a limited
portion of our Kinross common stock that we intend to sell within
one year, to enhance our return on Kinross common stock in ex-
change for some potential upside in those covered Kinross shares.
We have one Kinross call option outstanding at December 31, 2012;
however it expired unexercised in February 2013.  We do not an-
ticipate selling a material number of covered Kinross call options
during 2013.   See Note 6, “Derivative Instruments” to our Consol-
idated Financial Statements for an analysis of the changes in our de-

Management’s Discussion & Analysis | continued

rivative instruments, and the components that are used to deter-
mine the fair value of our derivative instruments.  

pendent on the quoted market price of Kinross stock on the date of
sale and may be at prices significantly below our projected price.    

We had $61,000 of depreciation and amortization expense during
2012 compared to $46,000 in 2011 primarily as a result of an in-
crease in furniture and fixtures at Mt. Hamilton.  We amortize these
assets over a three-year period.  We anticipate our 2013 deprecia-
tion and amortization costs will be similar to our 2012 amount. 

During 2012 we recorded interest expense, net of interest and div-
idend income, of $318,000 compared to $163,000 during the same
period in 2011.  The increase in interest expense is primarily re-
lated to an increase related to the RMB Loan where we recorded
$70,000 of interest expense related to the amortization of deferred
offering costs on the RMB Loan and we recorded $77,000 of inter-
est expense related to the discount recorded on the warrants issued
in connection with the RMB Loan.  Both the deferred offering costs
and the warrant discount are being amortized to interest expense on
a straight-line basis over the expected life of the RMB Loan.  In ad-
dition we paid $30,000 in interest on our outstanding RMB Loan
balance during 2012.  See Note 4, “Long-term Debt” to our Consol-
idated Financial Statements.  These increases in interest expense
were partially offset by reductions in our margin loan interest to
$58,000 during 2012 compared to $71,000 during 2011.   We
recorded interest expense related to our Augusta long-term debt of
$184,000 during 2012 compared to $217,000 during 2011. During
2012  we  recorded  dividend  income  of  $119,000  compared  to
$98,000 during 2011, primarily related to dividends on our Kinross
stock.  Remaining interest income recorded during 2012 and 2011
consisted of payments on cash and cash equivalent deposit ac-
counts.  We anticipate our interest expense will increase as we con-
tinue to utilize short-term margin loans to fund a portion of our
activities to supplement the sales of our Kinross common stock.  We
also anticipate dividend income will decrease during 2013 as we
sell a portion of our Kinross common stock to fund our operations.
See Note 3, “Short-term Debt” and Note 4, “Long-term Debt” to
our Consolidated Financial Statements for additional discussion of
our interest expense related to our short and long-term debt.

During 2012 we sold 180,000 shares of Kinross stock for proceeds
of $1,591,000 and recorded a gain on sale of Kinross of $1,464,000
compared to 2011 when we sold 130,000 shares of Kinross stock for
proceeds of $2,035,000 and recorded a gain on sale of $1,937,000.
In addition during 2012 we sold 570,000 shares of TNR for pro-
ceeds of $73,000 and recorded a gain on sale of $64,000.  We an-
ticipate we will continue to liquidate our holdings of Kinross stock
to fund our exploration activities and our 2013 budget anticipates
the sale of 320,000 shares of Kinross stock for assumed proceeds
of $3,200,000 during 2013.  These proceeds are significantly de-

During 2012 we recorded an income tax benefit of $648,000 com-
pared to an income tax benefit of $635,000 during 2011.  The small
change in our tax benefit during 2012 is primarily related to the
following factors, discussed above, which reduced our expected
2012 tax benefit compared to 2011: (a)  a reduction in the gain on
sale of marketable equity securities, (b) the decrease in our taxable
non-stock option general and administrative expenses and (c) the
decrease in our United States exploration costs; and these factors,
discussed above, which increased our expected 2012 tax benefit
compared to 2011: (a) our US taxable-deductible capitalized costs
at Mt. Hamilton, (b) the warrant liability expense and the deferred
offering cost expense incurred in connection with the RMB Loan,
and (c) the increased interest expense incurred during 2012 com-
pared with 2011.  See Note 5, “Income Taxes” to our Consolidated
Financial Statements for additional discussion of our income tax
expense and deferred income tax liability at December 31, 2012.
We provide a valuation allowance for our foreign net operating
losses, which are primarily related to our exploration activities in
Peru, Mexico and Brazil.  We anticipate we will continue to pro-
vide a valuation allowance for these net operating losses until we are
in a net tax liability position with regards to those countries where
we operate or until it is more likely than not that we will be able to
realize those net operating losses in the future.      

We regularly perform evaluations of our mineral property assets to
assess the recoverability of our investments in these assets.  All
long-lived assets are reviewed for impairment whenever events or
circumstances change which indicate the carrying amount of an
asset may not be recoverable utilizing guidelines based upon fu-
ture net cash flows from the asset as well as our estimates of the ge-
ologic potential of early stage mineral property and its related value
for future sale, joint venture or development by us or others.  Dur-
ing 2012 we recorded $31,000 of mineral property impairments re-
lated to our Triunfo and Espanola properties in Bolivia and our
Excelsior project in Peru compared to a mineral property impair-
ment of $10,000 related to our Paria Cruz project in Peru.

(d). Liquidity and Capital Resources 
Short-term Debt

As of December 31, 2012, we have borrowed $1,500,000 from UBS
Bank, USA (“UBS Bank”) pursuant to a secured credit line agree-
ment between us and UBS Bank and have accrued $1,000 of un-
paid interest on this debt in accounts payable. As of February 28,
2013, we have paid back $500,000, net on the UBS loan and have
an outstanding balance of $1,000,000.  The UBS Bank credit line
carries an interest rate which floats, based upon a base rate of

Solitario Exploration & Royalty Corp. | 13

Management’s Discussion & Analysis | continued

2.25%  plus  the  one-month  London  Interbank  Offered  Rate
(“LIBOR”), which was 0.25% as of December 31, 2012.  We are re-
quired to maintain minimum equity value percentages of 40% at
UBS.  The equity value percentage may be modified by UBS at any
time.  If the equity value in our account at UBS falls below the min-
imum, UBS may call the loan, or may sell enough Kinross shares
held in our brokerage account or liquidate any other assets to restore
the minimum equity value.  At December 31, 2012 and February
28, 2013, the equity balance in our account at UBS was 67% and
71%, respectively.  Solitario recorded interest expense related to
the UBS credit line of $36,000 and $50,000, respectively, for the
year ended December 31, 2012 and 2011.

We also have access to short-term margin loan borrowing capacity
from RBC Capital Markets, LLC (“RBC”) using our investment in
Kinross stock held at RBC as collateral for the short-term margin
loans.  As of December 31, 2012, we have repaid all short-term
margin loans previously borrowed from RBC.  We estimate we have
access to additional borrowing of approximately $1.0 million on our
RBC margin loan borrowing capacity as of February 28, 2013,
based upon the market value of our Kinross shares held at RBC.
The previously outstanding loans carried, and the currently out-
standing loan carries, interest at a margin loan rate of 4.25% per
annum.  The margin loan rate can be modified by RBC at any time.
The margin loans are callable by RBC at any time.  Per the terms
of the margin loans, we are required to maintain a minimum equity
value in the account of 35%, based upon the value of our Kinross
shares and any other assets held at RBC, less any short-term mar-
gin loan balance and any other balances owed to RBC.  The equity
value percentage may be modified by RBC at any time.  If the eq-
uity value in our account at RBC falls below the minimum, RBC
may call the loan, or may sell enough Kinross shares held in our
brokerage account or liquidate any other assets to restore the min-
imum equity value.  We recorded $22,000 and $21,000, respec-
tively, of interest expense related to the RBC short-term margin
loans for the year ended December 31, 2012 and 2011.

We are using this short-term debt as an alternative source of capi-
tal to selling our Kinross stock.  We intend to continue to borrow
money for the next year or longer using our Kinross common stock
as collateral to defer potential current United States income taxes
if we were to sell our Kinross common stock in excess of our antic-
ipated United States tax deductible expenses for the entire year of
2013, which consist primarily of United States general and admin-
istrative costs and a portion of our costs to develop the Mt. Hamil-
ton project in Nevada.   We anticipate the proceeds from the sale of
Kinross common stock sold during 2013 will not exceed our antic-
ipated United States tax deductible expenses, and accordingly, we
do not anticipate having any currently payable United States in-

come taxes for 2013.  We anticipate proceeds from the sale of shares
of Kinross common stock and proceeds from borrowing from the
RMB Loan and any loans against our investment in Kinross stock
will provide adequate funds for our operations through the end of
2013.  Our use of short-term borrowing is not considered critical to
our liquidity, capital resources or credit risk strategies.  We con-
sider the use of short-term borrowing as a component of our overall
strategy to potentially maximize our after-tax returns on the sale of
our investment in Kinross stock.  We currently intend to repay the
short-term debt with proceeds from the sale of Kinross stock in the
future.    Our  maximum  amount  of  short-term  borrowing  was
$3,287,000, including accrued interest, during the year ended De-
cember 31, 2012.  Our average short-term borrowing during the
year ended December 31, 2012 was $2,665,000.  Subsequent to
December 31, 2012, we repaid $500,000 of short-term borrowings
and as of February 28, 2013, we have a total of $1,000,000 out-
standing under short-term margin loans.

Long-term Debt

RMB Facility Agreement
On August 10, 2012, we entered into a Facility Agreement with
RMBAH and RMBR.  Under the Facility Agreement, we may bor-
row up to $5,000,000 from RMBAH (with any amounts outstanding
collectively being the “RMB Loan”) at any time during the 24-
month period commencing on August 21, 2012, the date of initial
funding (the “Availability Period”), after which time any undrawn
portion of the $5,000,000 commitment will be cancelled and will no
longer be available for drawdown.  We borrowed $1,500,000 on Au-
gust 21, 2012 from which we received net proceeds of $912,000
after deducting deferred offering costs of $588,000, which included
an arrangement fee of $250,000, legal costs of $328,000 and other
costs of $10,000.  The deferred offering costs are recorded in other
long-term assets and are being amortized on a straight-line basis to
interest expense over 36 months, the term of the Facility Agree-
ment.  We recorded deferred offering costs of $518,000 as of De-
cember 31, 2012 in other assets.  In February 2013, we borrowed
an additional $1,000,000 and at February 28, 2013, the balance of
the RMB Loan is $2,500,000.  

The RMB Loan matures on the earlier to occur of (i) 36 months from
the date of initial funding or (ii) the date on which financing is made
available to MH-LLC for purposes of placing the Mt. Hamilton proj-
ect into commercial production.  The RMB Loan amounts bear in-
terest at the 90-day LIBOR rate plus 5%, payable in arrears on the
last day of each quarterly interest period.  All proceeds from the
RMB Loan are deposited in a proceeds account (the “Proceeds Ac-
count”) and are recorded as restricted cash until disbursed in ac-
cordance with the Facility Agreement.  Pursuant to the Facility
Agreement, funds may only be disbursed from the Proceeds Ac-

14 | 2012 Annual Report

Management’s Discussion & Analysis | continued

count for approved expenditures, including (i) exploration and de-
velopment activities at the Mt. Hamilton project, ongoing earn-in
payments at MH-LLC, general corporate purposes as set forth in a
project and corporate budget approved by RMBAH and (ii) any
other purpose approved by RMBAH. As of December 31, 2012,
there was no cash balance in the Proceeds Account.  The RMB
Loan may be repaid at any time without penalty.  Any amounts re-
paid may not be redrawn under the Facility Agreement.  The RMB
Loan is secured by a lien on our 80% interest in MH-LLC as well
as a general security interest in our remaining assets.  

As of December 31, 2012, the outstanding balance of the RMB
Loan was $1,500,000.  During 2012 we recorded the following in-
terest expense related to the RMB Loan:

(in thousands)

Year ended December 31, 2012

Interest expense paid 

in cash

Amortization of the RMB 

Warrants discount
Amortization of RMB 

deferred offering costs

Total interest expense 

$  

30 

77 

70 

related to the RMB Loan

$

177 

RMB Warrants
Pursuant to the Facility Agreement, we issued 1,624,748 warrants
to RMBAH as partial consideration for financing services provided
in connection with the Facility Agreement. Each RMB Warrant en-
titles the holder to purchase one share of Solitario common stock
pursuant to the terms and conditions of the RMB Warrants. The
RMB Warrants expire 36 months from their date of issuance and
have an exercise price of $1.5387 per share, subject to customary
anti-dilution adjustments.  We recorded a discount to the RMB
Loan for the fair value of the RMB Warrants of $650,000 as of Au-
gust 21, 2012, based upon a Black-Scholes model using a 36-month
life, volatility of 62%, and a risk-free interest rate of 0.39%.  We are
amortizing this discount on a straight-line basis to interest expense
over the three-year term of the RMB Loan and as of December 31,
2012, the remaining unamortized warrant discount was $573,000.   

Augusta long-term debt
In connection with the formation of MH-LLC, the Mt. Hamilton
properties contributed by DHI-US to MH-LLC were subject to a se-
curity interest granted to Augusta related to Ely’s acquisition of the
Mt. Hamilton properties.  Pursuant to the MH Agreement, as part of
our earn-in, we agreed to make private placement investments total-
ing $2,500,000 in Ely common stock, all to provide Ely with the
funds necessary for Ely to make the loan payments due to Augusta.
The payments due to Augusta are non-interest bearing.  Accord-

ingly, upon formation and the contribution of the mineral properties
by DHI-US to MH-LLC, MH-LLC recorded discounted fair value of
the payments due to Augusta, discounted at 7.5%, which was our es-
timated cost of similar credit as of the formation of MH-LLC.   

The following is the schedule of debt payments due to Augusta as
of December 31, 2012 and 2011:

Payment date

June 1, 2012
June 1, 2013
June 1, 2014
June 1, 2015
Unamortized discount
Total 
Current portion
Long-term debt

December 31,

2012  

2011

$

-    $ 750,000 
750,000 
750,000 
1,000,000 
(448,000)
2,802,000 
727,000 
$2,075,000 

750,000 
750,000 
1,000,000 
(264,000)
2,236,000 
727,000
$1,509,000 

During 2012 and 2011 we recorded $184,000 and $217,000, re-
spectively, for accretion of interest expense related to the Augusta
note and paid $750,000 and $500,000, respectively, on the long-
term note.    

Joint Venture and Delay Rental Payments

In the past, we have financed our activities through the sale of our
properties, joint venture arrangements, and the sale of our securities
and from the sale of our marketable equity security investment in
Kinross. We received $200,000, each year respectively, from joint
venture payments during 2012 and 2011 related to delay rental pay-
ments on our Bongará project, discussed above, and during 2012
and 2011 we received $100,000 and $50,000 delay rental payments,
respectively, on our Mercurio project in Brazil.  Receipts from joint
venture payments previously occurred on an infrequent basis.  Per
our agreements with both Votorantim on Bongará and Brazilian Gold
Corporation on Mercurio, the joint venture partners may terminate
the agreements at any time, and will not be required to make further
delay rental payments if they terminate the agreements.   Our agree-
ment with Votorantim on our Bongará project calls for annual delay
rental payments of $200,000 until Votorantim provides notice that it
has made certain minimum expenditures or makes a decision to
place the project in production or decides to drop the project.  We
expect future revenues from joint venture payments and from the
sale of properties, if any, would occur on an infrequent basis.

Sale of Mineral Property

During 2012, MH-LLC completed the sale of a 2.4% net smelter re-
turns royalty (“NSR”) on the Mt. Hamilton project to Sandstorm for
$10,000,000.  MH-LLC received an upfront payment of $6,000,000
upon signing the agreement and received $4,000,000 on January

Solitario Exploration & Royalty Corp. | 15

Management’s Discussion & Analysis | continued

15, 2013, which we have recorded as a current asset as of Decem-
ber 31, 2012.  See Note 2, “Mineral Properties” to our Consolidated
Financial Statements below for further discussion of the Sandstorm
royalty sale.  Previously a significant sale of mineral properties oc-
curred in 2000 when we sold our interest in our Yanacocha prop-
erty in Peru for $6,000,000 in cash.  Any sales of property, whether
as a royalty, gold-stream or outright sale will also occur in the future,
if at all, on an infrequent basis. 

MH Agreement

During 2012, MH-LLC distributed $2.5 million to its members in
proportion to their interests.  Solitario received $2.0 million from
this distribution which was eliminated in consolidation.  In addition
Solitario received $500,000 from DHI-US to repay a portion of a
prior loan to Solitario, and Solitario agreed to forgive $35,000 of ac-
crued interest due from DHI-US, which represented the accrued
interest  on  loans  made  to  DHI-US  in  connection  with  the  MH
Agreement through June 30, 2012.  

Investment in Marketable Equity Securities

Our marketable equity securities are classified as available-for-sale
and are carried at fair value, which is based upon market quotes of
the underlying securities.  At December 31, 2012 and 2011, we
owned 670,000 and 850,000 shares of Kinross common stock, re-
spectively.  The Kinross shares are recorded at their fair market value
at December 31, 2012 and 2011 of $6,512,000 and $9,690,000, re-
spectively. In addition we own other marketable equity securities at
December 31, 2012 and 2011 with a fair value of $581,000 and
$671,000, respectively.  Our investments in marketable equity secu-
rities are based upon market quotes on the NYSE and the TSXV.  At
December 31, 2012, we have classified $3,110,000 of our marketable
equity securities as a short-term asset.  Changes in the fair value of
marketable equity securities are recorded as gains and losses in other
comprehensive income in shareholders’ equity.  During the year
ended December 31, 2012, we recorded a loss in other comprehen-
sive income on marketable equity securities of $3,131,000, less re-
lated deferred tax expense of $1,168,000.  

During the year ended December 31, 2012, we sold 180,000 shares
of Kinross stock for proceeds of $1,591,000, resulting in a gain of
$1,464,000 which was transferred, less related deferred tax expense
of $546,000, from previously unrealized gain on marketable equity
securities in other comprehensive income.   We also own (i) 430,000
shares of TNR Gold Corp. that are recorded at their fair market value
of $39,000 at December 31, 2012; (ii) 250,000 shares of Interna-
tional Lithium Corporation that are recorded at their fair market of
$10,000 at December 31, 2012 and (iii) 3,333,333 shares of Ely that
are recorded at their fair market value of $532,000, all of which are
classified as marketable equity securities available for sale.  

Any change in the market value of the shares of Kinross common
stock could have a material impact on our liquidity and capital re-
sources.  The price of shares of Kinross common stock varied from
a high of $12.85 per share to a low of $7.31 per share during the
year ended December 31, 2012.

Kinross Calls 

Beginning in December 2008, Solitario sold covered calls covering
its shares of Kinross common stock.  In September 2012, Solitario
sold options covering 100,000 shares for proceeds of $68,000.  In
November 2012 Solitario repurchased options for 50,000 shares for
$17,000, and recorded a gain on derivative instruments of $23,000.
As of December 31, 2012, the remaining options for 50,000 shares
were recorded in other current assets at its fair value of $3,000 and
Solitario recorded a gain on derivative instruments of $25,000.  This
option expired unexercised in February 2013.  In September 2011
Solitario  sold  options  covering  65,000  shares  for  proceeds  of
$57,000, which were repurchased in October 2011 for $15,000 and
Solitario recorded a gain of $42,000 in gain/loss on derivative earn-
ings.   Solitario has not designated its covered calls as hedging in-
struments as described in ASC 815 and any changes in the fair
market value of its covered calls are recognized in the statement of
operations in the period of the change.  Solitario does not use its cov-
ered call derivative instruments as trading instruments; any cash re-
ceived or paid related to its derivative instruments is shown as
investing activities in the consolidated statement of cash flows.

The business purpose of the Kinross calls was to lock in a specific
price on a portion of the Kinross shares we intended to sell within
the next year.  We will continue to look toward other Kinross risk
management  options  to  meet  our  risk  management  objectives.
These alternatives include the use of short-term margin loans, dis-
cussed above, listed options, use of covered calls and sale of the
investment.  The use of these Kinross risk management strategies
reduces the potential of paying significant taxes on a near-term sale
of the entire investment in Kinross shares based upon both (i) the
projected future needs for the use of funds from any sales of the in-
vestment in Kinross shares and (ii) the potential generation of future
United States net operating losses which could be used to offset any
taxable gains on future sale of the investment in Kinross shares.
We have not designated the Kinross calls as hedging instruments as
described in ASC 815 and any changes in the fair market value of
the Kinross Collar or the Kinross calls are recognized in the state-
ment of operations in the period of the change.  

Working Capital

We had working capital of $4,245,000 at December 31, 2012 com-
pared to working capital of $345,000 as of December 31, 2011.  Our
working capital at December 31, 2012 primarily consists of our cash

16 | 2012 Annual Report

Management’s Discussion & Analysis | continued

and equivalents, the $4,000,000 Sandstorm receivable, and the cur-
rent portion of our investment in 670,000 shares of Kinross common
stock of $3,110,000, less our short-term margin loan of $1,500,000,
current portion of long-term debt of $727,000 and current deferred
income taxes of $963,000 primarily related to our planned sales of
Kinross common stock during the next year.  We intend to liquidate
a limited portion of our Kinross shares over the next year, in order
to continue to defer current United States income taxes on the sale
of shares of Kinross common stock.  We also intend to borrow pur-
suant to the RMB Facility Agreement and to borrow on margin at
RBC and on our UBS Bank secured credit line.  We will continue to
monitor our exposure to a single asset, taking into consideration our
cash and liquidity requirements, tax implications, the market price
of gold and the market price of Kinross stock.  We have budgeted the
anticipated sale of 320,000 shares of Kinross stock during 2013 for
assumed proceeds of $3,200,000.  Any funds received from the sale
of our Kinross shares or borrowing against the value of our Kinross
shares would be used primarily to fund exploration and develop-
ment on our existing properties, for the acquisition and exploration
of new properties and general working capital. 

Cash and cash equivalents were $616,000 as of December 31, 2012
compared to $432,000 at December 31, 2011.  As of December 31,
2012, our cash balances along with our available credit from the
RMB Facility Agreement, our investment in marketable equity se-
curities and our UBS Bank credit line are considered adequate to
fund our expected expenditures over the next year, including our
planned 2013 development and payment obligations related to MH-
LLC and the Mt. Hamilton project.   

The nature of the mining exploration business requires significant
sources of capital to fund exploration, development and operation
of mining projects.  We will need additional resources to fund our
long-term payment obligations associated with MH-LLC, develop
the Mt. Hamilton project on our own and explore any mineral de-
posits we have.  We anticipate that we would finance these activi-
ties through the use of joint venture arrangements, the issuance of
debt or equity, the sale of interests in our properties or the sale of
our shares of Kinross common stock.  There can be no assurance
that a combination of such sources of funds will be available in the
quantity or on terms acceptable to us, if at all.

Sale of Our Common Stock

On  June  26,  2012,  we  sold  180,000  shares  of  common  stock  to
Christopher Herald, President and Chief Executive Officer of Soli-
tario, and 45,000 shares of common stock to James Maronick, Chief
Financial Officer of Solitario, at a price of $1.22 per share. The pur-
chase of the shares was unanimously approved by our Board of Direc-
tors and was also unanimously approved by our Audit Committee of

the Board of Directors.  The price of the shares was the last closing
price of our common shares as quoted on the NYSE MKT (formerly
NYSE Amex) on June 25, 2012.  Solitario received total proceeds of
$274,500.  During 2011 we completed a public offering of 3,400,000
shares of our common stock at a price to the public of $2.50 per share
and on May 9, 2011, we sold an additional 510,000 shares at $2.50
per share, upon the exercise of the underwriter’s option to cover over-
allotments.  The net proceeds from the offering were $8,937,000 after
the underwriter’s commission of six percent totaling $587,000 and of-
fering costs of $251,000.  The offering was made pursuant to a shelf
registration statement on Form S-3 filed with the SEC on March 18,
2011, which was declared effective on March 29, 2011.  

Any future sale of our common stock, if any, would be dependent
on a number of factors including the market price of our stock, the
availability of investors, our ability to meet necessary regulatory re-
quirements, including possible registration of the shares to be sold
with the United States Securities and Exchange Commission among
other things, none of which are currently in place.  

Stock-based Compensation Plans

During the year ended December 31, 2012, no options were exercised
from the 2006 Plan and we granted 165,000 options from the 2006
Plan.  During the year ended December 31, 2011, 150,600 options
were exercised for proceeds of $247,000 and no options were granted
from the 2006 Plan.  None of our outstanding options from the 2006
Plan expire during 2013.  We do not expect a significant number of our
vested options from the 2006 Plan will be exercised in the next year.
See Note 9, “Employee Stock Compensation Plans” to our Consoli-
dated Financial Statements for a summary of the activity for stock op-
tions outstanding under the 2006 Plan as of December 31, 2012.  

Off-balance Sheet Arrangements

As of December 31, 2012 and 2011, we have no off-balance sheet
arrangements. 

(e). Cash Flows 

Net cash used in operations during the year ended December 31, 2012
decreased to $3,504,000 compared to $7,931,000 for 2011 primarily
as a result of (i) a decrease in exploration expenses to $1,986,000 in
2012 compared to $5,946,000 in 2011, primarily related to  the cap-
italization of $3,129,000 in exploration and development costs at our
Mt. Hamilton project, as discussed above and included in investing ac-
tivities; (ii); a decrease in non-stock option general and administra-
tive costs to $1,948,000 during 2012 compared to $2,160,000 during
2011 and an increase in joint venture property payments to $300,000
during 2012 compared to $242,000 during 2011.   These decreased
uses and increased sources of cash were partially mitigated by an in-
crease in interest expense during 2012.  

Solitario Exploration & Royalty Corp. | 17

Management’s Discussion & Analysis | continued

Net cash provided from investing activities increased to $3,870,000
during 2012 compared to $193,000 during 2011 primarily related
to  proceeds  of  $6,000,000  from  the  Sandstorm  sale,  discussed
above.  This increase was partially offset by (i) a decrease in the
proceeds  from  the  sale  of  marketable  equity  securities  to
$1,664,000 during 2012 compared to $2,035,000 during 2011; dur-
ing 2012 we sold 180,000 shares of Kinross at an average price of
$8.83 per share compared to the sale of 130,000 shares of Kinross
at an average price of $15.65 per share; and (ii) the capitalization
of $3,129,000 of development costs at Mt. Hamilton during the year.  

Net cash provided from (used in) financing activities decreased to
$(182,000) during 2012 compared to $7,692,000 during 2011.  The
primary reason for the decrease in cash provided from financing
activities in 2011 was related to the equity offering which provided
$8,937,000 in cash during 2011 and no similar financing was com-
pleted during 2012.  The decrease in cash provided from (used in)
financing activities during 2012 was partially offset by an increase
in cash due to the RMB Loan and reductions in net cash repaid to
$500,000 during 2012 compared to net cash repaid of $872,000
during 2011 for short-term borrowing.    

(f). Development Activities, Exploration 

Activities, Environmental Compliance and 
Contractual Obligations 

Development Activities

With the completion of the Feasibility Study on February 22, 2012,
we entered the development stage of the Mt. Hamilton project.  The
development of the Mt. Hamilton project, if it occurs, will entail a
significant capital investment, which is estimated in the Feasibil-
ity Study to be $71.9 million.  We currently do not have the funds
for the estimated $71.9 million capital investment to develop the
Mt. Hamilton project.  The funding for the full development will re-
quire significant additional capital which we anticipate may come
from the liquidation of our investment in Kinross, additional is-
suance of our common stock, equipment leasing, debt and com-
modity stream financing, none of which is currently in place to
adequately fund the required capital investment.  We cannot pro-
vide any assurance that such capital will be available in sufficient
amounts, if at all.   If we develop the Mt. Hamilton deposit, we will
be responsible for reclamation of the Mt. Hamilton project at the
completion of mining.  In addition we are required to make certain
annual claim payments on our mineral property at Mt. Hamilton
and to make payments to DHI-US, Ely and to certain other under-
lying leaseholders at Mt. Hamilton to maintain our ownership of
MH-LLC and the Mt. Hamilton project.  These obligations are de-
tailed below under “Contractual Obligations.”  If we fail to make
any of these payments we may lose some or all of our interest in
MH-LLC and/or the Mt. Hamilton project.

Exploration Activities

A significant part of our business involves the review of potential
property acquisitions and continuing review and analysis of prop-
erties in which we have an interest, to determine the exploration
and development potential of the properties.  In analyzing expected
levels of expenditures for work commitments and property pay-
ments, our obligations to make such payments fluctuate greatly de-
pending on whether, among other things, we make a decision to sell
a property interest, convey a property interest to a joint venture, or
allow our interest in a property to lapse by not making the work
commitment or payment required.  In acquiring our interests in
mining claims and leases, we have entered into agreements, which
generally may be canceled at our option.  We are required to make
minimum rental and option payments in order to maintain our in-
terest in certain claims and leases.  Our net 2012 mineral and sur-
face property rental and option payments included in exploration
expense were $127,000.  In 2013 we estimate our net exploration
property rentals and option payments for properties we own or op-
erate, excluding Mt. Hamilton, to be approximately $805,000, as-
suming that our joint ventures continue in their current status and
that we do not appreciably change our property positions on exist-
ing properties, we estimate that our joint venture partners will pay
on our behalf, or reimburse us approximately $777,000 of these an-
nual payments.  These obligations are detailed below under “Con-
tractual Obligations.”  In addition, we may be required to make
further payments in the future if we elect to exercise our options
under those agreements or if we enter into new agreements.   

Environmental Compliance

We are subject to various federal, state and local environmental
laws and regulations in the countries where we operate.  We are re-
quired to obtain permits in advance of initiating certain of our ex-
ploration activities, to monitor and report on certain activities to
appropriate authorities, and to perform remediation of environmen-
tal disturbance as a result of certain of our activities.  Historically,
the nature of our activities of review, acquisition and exploration of
properties prior to the establishment of reserves, which may include
mapping, sampling, geochemistry and geophysical studies, as well
as some limited exploration drilling, has not resulted in significant
environmental impacts in the past.  We have historically carried on
our required environmental remediation expenditures and activi-
ties, if any, concurrently with our exploration activities and expen-
ditures.    The  expenditures  to  comply  with  our  environmental
obligations are included in our exploration expenditures in the
statement of operations and have not been material to our capital or
exploration expenditures, and have not had a material effect on our
financial position.  For the years ended December 31, 2012 and
2011, we have not capitalized any costs related to environmental
control facilities.  We do not anticipate our non-Mt. Hamilton proj-

18 | 2012 Annual Report

Management’s Discussion & Analysis | continued

ect exploration activities will result in any material new or addi-

sure bonds to the federal and state regulatory agencies must be put

tional environmental expenditures or liabilities in the near future.

in place and are dependent on, among other things, receiving re-

Our planned Mt. Hamilton project development activities will in-

crease our environmental expenditures in the event we complete the

quired permits and obtaining necessary financing.  None of which

are in place currently; please see “Risk Factors” in Item 1A of Part

I, of this Form 10-K.  While we anticipate the majority of our activi-

development of the Mt. Hamilton project, which entails among other

ties during 2013 at our Mt. Hamilton project will relate to obtaining

things, building a mine, building and operating an open pit, an ore

required permits to develop the project, we do not expect any of these

processing plant and leach pads and other similar activities.  Prior to

activities to result in additional environmental exposures or required

mining development activities, substantial reclamation and mine clo-

environmental remediation expenditures within the next year.  

Contractual Obligations
The following table provides an analysis of our contractual obligations at December 31, 2012:

(in thousands)

As of December 31, 2012 – Payments due by period

Operating lease obligations
Short-term margin loan (1)
Land holding costs (2)
Mt. Hamilton land holding costs (3)
Mt. Hamilton cash earn-in payments (4)
Mt. Hamilton earn-in payments in stock 
of Solitario (4)(5)
Mt. Hamilton advance royalty and royalty 
buy-down payments (4)(6)
Augusta long-term debt (4)(7)
RMB long-term debt (8)
Total

$

Total

98 
1,500
28
1,814
1,000

336

6,800
2,500
1,500
$ 15,576

$

Less than 
1 year
65 
1,500
28
279
500

168

300
750
-  
3,590

$

1-3
years

3-5
years

$

$

33  
-  
-  
758
500 

168 

5,600
1,750
1,500
10,309

$

$

-  
-  
-  
518
-  

-  

600
-  
-  
1,118

More than
5 years
-
$
-
-  
259
-  

-  

300
-  
-  
$ 559

(1) The short-term margin loan is due on demand and includes $1,000 of ac-

crued interest at December 31, 2012.

(2) Excluding Mt. Hamilton, discussed below, our other land holding con-
tractual  obligations,  net  of  expected  joint  venture  reimbursements  of
$777,000.   Our non-Mt. Hamilton land holding agreements are gener-
ally cancelable at our option and this amount includes all required net
land payments for the next 12 months to maintain our existing mineral
properties.  

(3)  Mt. Hamilton land holding costs have been shown through 2017 and in-
clude $44,000 of annual unpatented mining claim fees, minimum cash
stand-by royalty and land payments and required minimum royalty pay-
ments of 33 ounces of gold per year in 2016, 2017 and 2018, valued at
$1,664 per ounce, the closing price of an ounce of gold at December 31,
2012, quoted on kitco.com.

(4)  Pursuant to the MH Agreement, we have agreed to make the following
payments as part of our earn-in upon completion of the Feasibility Study:
We have agreed to (i) make the $2,500,000 payments to Ely discussed
below in (7) to DHI-US, to enable Ely to make payments  in satisfaction
of the Augusta long-term debt and (ii) make payments totaling $500,000
and deliver100,000 shares of Solitario common stock to DHI-US by Au-
gust 23, 2013, of which $250,000 was paid and 50,000 shares of our
stock were delivered in February 2013.  We have further agreed to (i)
make payments totaling $500,000 to DHI-US and deliver 100,000 shares
of Solitario common stock to DHI-US by August 23, 2014.  Finally, we
have agreed to (i) buy down the existing 6% net smelter return (“NSR”)
royalty to a 1% NSR royalty by paying the underlying royalty holder
$5,000,000 on or before commercial completion of the Mt. Hamilton proj-
ect.  If we fail to make any of the payments due to DHI-US, described

above, or fail to make the annual advanced royalty payments discussed
below or fail to pay down the existing royalty, discussed below, our inter-
est in MH-LLC will be reduced to 49% and DHI-US’s interest will be in-
creased to 51%.

(5)  The commitment value of the shares of Solitario stock to be paid to DHI-
US, discussed above in note (4) to this table, have been valued at $1.68
per share, the December 31, 2012 ending stock price as quoted on the
NYSE MKT.

(6)  The minimum annual advance royalty payments of $300,000 per year
have been included in this table through December 2017.  In addition the
$5,000,000 royalty buy-down discussed above is due on or before com-
mercial completion, which is estimated to occur in November 2014 for
purposes of this schedule only.  The actual date of commercial completion
is not currently known and is dependent upon obtaining permits, financ-
ing and other factors, none of which are currently in place and may be
delayed for a number of reasons beyond our control.  Please see “Risk
Factors,” above. 
Includes unamortized discount as of December 31, 2012; see “Long-term
debt” above.  These payments of $2,500,000 will be made to Ely, in the
form of private placements for Ely common stock, of $750,000 in May
2013, $750,000 in or before May 2014, and $1,000,000 in or before
May 2015, as further discussed below in Note 10 to our Consolidated Fi-
nancial Statements, “Ely Gold investment and the Mt. Hamilton Joint
Venture.”  

(7) 

(8)  The RMB Loan is a three-year term loan and is estimated to be paid in
full for the purpose of this schedule on or before August 2015 and this
payment schedule does not include $1,000,000 borrowed pursuant to the
RMB Facility Agreement in February 2013.

Solitario Exploration & Royalty Corp. | 19

Management’s Discussion & Analysis | continued

(g). Mt. Hamilton Development Project 
Mt. Hamilton Joint Venture

(h). Exploration Joint Ventures, Royalty and 

Other Properties 

The Mt. Hamilton gold property, located in east-central Nevada, is
currently the most important project in the Company and is our pri-
mary focus for 2013.  With the completion of the Feasibility Study
in February 2012, we have now earned an 80% interest in the prop-
erty.  It is our only property with proven and probable reserves.  Our
initial participation in the Mt. Hamilton property began in August
2010, when we signed a Letter of Intent with Ely Gold to earn up to
an 80% interest.  In December 2010 we entered into the definitive
MH Agreement with DHI-US, a wholly owned subsidiary of Ely
Gold, with respect to MH-LLC, the limited liability company that
holds the Mt. Hamilton project assets.  During 2012 upon comple-
tion of the Feasibility Study we earned an 80% interest in MH-LLC.
During 2012 Solitario, Ely and DHI-US revised the MH Agreement
to require the royalty reduction payments to be made as described
in the Contractual Obligations table above.  Previously, the MH
Agreement obligated Solitario to make the continuing payment ob-
ligations to CMC of $3,500,000 on or before November 13, 2013
and $1,500,000 on or before November 13, 2014.  In addition, Soli-
tario, Ely and DHI-US revised the LOI to clarify the timing and
pricing of the payments due to Ely under the private placement as
further described in Note 10, “Ely Gold Investment and the Mt.
Hamilton Joint Venture”  to our Consolidated Financial Statements.

We are the manager of all project activities.  Our focus for 2013 is
to advance environmental permitting for the project.  The most im-
portant component of permitting will be approval of the Plan of Op-
erations.  The Plan of Operations is currently being reviewed by the
USFS to determine its completeness, and then to develop and man-
age the appropriate permitting path and activities for the project.
There can be no assurance as to when permitting will be completed
as it is dependent on a number of factors over which we have no con-
trol.  As part of the permitting process, we will undertake public
scoping meetings to define potential concerns and develop mitiga-
tion plans to address issues identified by all stakeholders, which in-
cludes the public, local communities, county, state, and federal
regulatory agencies, and Native American input.  Other planned ac-
tivities for 2013 are additional drilling south of the Centennial re-
serves in an area called Wheeler Ridge, metallurgical testing of
Seligman mineralization to determine gold and silver recoveries, ad-
ditional reserve and resource modeling of both the Centennial and
Seligman deposits incorporating the 2012 drilling and 2013 metal-
lurgical results, and an update of the project’s economic model.  

We have budgeted approximately $3,668,000 for permitting activ-
ities, planned development, land and earn-in payments for 2013 at
Mt. Hamilton. 

The following discussion relates to an analysis of our anticipated
property exploration plans as of December 31, 2012.  Please also
see Note 2, “Mineral Properties” to our Consolidated Financial
Statements, for a more complete discussion of all of our mineral
properties.

Bongará

The Bongará project is an advanced-stage high-grade zinc project
in Peru.  Based on extensive exploration and development work
conducted to date, we believe the property has excellent potential
to be developed into a mine over the next several years.  In August
2006 we signed a Letter Agreement with Votorantim Metais (“Vo-
torantim”), granting Votorantim the right to earn up to a 70% inter-
est in the project by meeting certain spending and development
milestones.  The Bongará project hosts the Florida Canyon zinc de-
posit, where high-grade zinc mineralization has been encountered
in drill holes over an area approximately 2.5 kilometers by 1.3 kilo-
meters in dimension.  

Votorantim is funding and managing all work conducted on the proj-
ect.   Votorantim’s work plans for 2013 will focus on activities nec-
essary to complete a prefeasibility study by mid-year and then to
transition to feasibility-level work in the second half of the year.  As
part of this program, construction of a new 700-meter long tunnel
to provide underground access and drilling platforms in the Karen-
Milagros zone of the Florida Canyon deposit is planned, as well as
extending the existing San Jorge tunnel a further 300 meters to the
south to test for the continuation of high-grade mineralization.  De-
tailed drilling from both these tunnels will provide feasibility-level
reserve information.  Construction of these new tunnels will begin
upon permit approval, which is expected in the first half of 2013.
A total of 25,000 meters of both surface and underground drilling
is scheduled this year.  Other work scheduled includes additional
metallurgical testing, more detailed engineering of site infrastruc-
ture, update of the deposit model incorporating the results of the
2012 drilling program, additional hydrologic and geotechnical stud-
ies that began in 2012, and completing the 32-kilometer access
road to the mine site.  Permitting and social development activities
with surrounding communities will also continue throughout 2013.

Pedra Branca 

The Pedra Branca project is an advanced-stage project in which we
are exploring for platinum and palladium (“PGM”) in Brazil.  Sev-
eral well mineralized bodies containing strong values of PGM’s have
been delineated by drilling.  We believe there is good potential to
discover additional PGM-bearing deposits.  The property is 100%
owned  by  PBM.    Our  joint  venture  partner,  Anglo  Platinum

20 | 2012 Annual Report

(“Anglo”), currently owns 51% of PBM and is funding, through
PBM, all work conducted on the project.  We hold a 49% interest
in PBM.  We deconsolidated PBM during 2010 and record our share
of any exploration expense as our equity interest in the gains and
losses of PBM against its investment in PBM.  As part of the Share-
holders Agreement, Anglo is the manager of the project and is paid
a management fee of 5% of the incurred costs at PBM. 

Anglo has indicated the 2013 exploration program will consist of
helicopter-borne geophysics on closely spaced flight lines travers-
ing areas potentially underlain by ultramafic rocks.  Ultramafic
rocks are highly magnetic and detectable by geophysics.  Ultra-
mafic rocks are also the host to all PGM mineralization identified
on the property.  If the geophysical program is successful in iden-
tifying new ultramafic bodies, Anglo has indicated PBM may drill
test these areas in late 2013 or the first half of 2014.

Pachuca Norte

The Pachuca Norte project (formerly referred to as “Pachuca-Real”)
located in central Mexico is an early-stage exploration project in
which we are exploring for silver and gold.  We believe the project
has excellent potential to host multiple high-grade silver-gold veins
over a fairly large area.  

In March 2013 we signed a binding Letter of Intent (“LOI”) with
Minera Hochschild Mexico S.A. de C.V. (“Hochschild”), a wholly
owned subsidiary of Hochschild Mining plc.  The LOI provides for
Hochschild  to  earn  a  51%  interest  in  the  property  by  funding
$10,000,000 in exploration commitments over the next five years
from the date of signing a definitive agreement.  Hochschild will
have the option to earn an additional 19% (total interest 70%) by
funding all project expenditures necessary to complete a positive
feasibility study.  Hochschild will manage the operations and has
the right to terminate the joint venture at any time.  Currently, we
and Hochschild are working on negotiating a definitive joint ven-
ture agreement.  There can be no assurance that such an agreement
will  ultimately  be  signed.    Assuming  a  definitive  agreement  is
signed, Hochschild has committed to a firm $1.5 million explo-
ration  work  commitment  over  the  first  12-month  period.
Hochschild has indicated that their exploration plans for 2013 in-
clude drilling core holes that offset well-mineralized previous drill
holes to determine the trend of mineralization.     

Yanacocha Royalty Property

The 61,000-hectare Yanacocha royalty property is located in north-
ern Peru immediately north of Newmont Mining-Buenaventura’s
Minera Yanacocha Mine, the largest gold mine in South America.
We acquired the property in 1993 and sold it to Newmont in 2000
for $6.0 million and we retained a net smelter return (“NSR”) roy-
alty on the property.  We amended the NSR royalty schedule in Jan-

Stock Performance Graph

uary 2005 at which time Newmont committed to a long-term US$4.0
million work program on our royalty property.  We consider the
property to be an early-stage exploration property, but believe it has
good potential to host gold mineralization.  Newmont continues to
conduct annual exploration work on the property, and we see this
work continuing for the foreseeable future.

Other Properties

For Peru and Mexico, we have budgeted approximately $1,396,000
in 2013 for exploration on our wholly owned exploration projects
and project generation activities for 2013.  These activities include
mapping, sampling, geophysical and geochemical analysis, and po-
tentially acquisitions of new properties.  We are not planning on
drilling any of these early stage projects in 2013.   

(i). Discontinued Projects

During 2012 we abandoned our Triunfo and Espanola properties in
Bolivia and our Excelsior project in Peru and we recorded mineral
property impairments of $31,000.  During 2011 we abandoned the
Paria Cruz project and recorded a mineral property write-down of
$10,000.  

(j). Significant Accounting Policies

See Note 1, “Business and Summary of Significant Accounting Poli-
cies” to our Consolidated Financial Statements for a discussion of
our Significant Accounting Policies.

(k). Related Party Transactions

On June 26, 2012, Christopher Herald, our President and Chief
Executive Officer, and James Maronick, our Chief Financial Offi-
cer, purchased shares of our common stock at a price of $1.22 per
share, with Mr. Herald purchasing 180,000 shares and Mr. Maron-
ick purchasing 45,000 shares. The purchase of the shares was
unanimously approved by our Board of Directors and was also unan-
imously approved by our Audit Committee of the Board of Directors.
The price of the shares was the last closing price of our common
shares as quoted on the NYSE MKT on June 25, 2012.  We received
total proceeds of $275,000.  

(l). Recent Accounting Pronouncements

There are no recently issued accounting standards for which the
Company expects a material impact on our Consolidated Financial
Statements.

Solitario Exploration & Royalty Corp. | 21

Report of Independent Registered Public Accounting Firm

To the Board of Directors and Shareholders
Solitario Exploration & Royalty Corp.
Wheat Ridge, Colorado

We have audited the accompanying consolidated balance sheets of Solitario Exploration & Royalty Corp. (the “Company”) as of Decem-
ber 31, 2012 and 2011, and the related consolidated statements of operations, comprehensive loss, shareholders’ equity, and cash flows
for the years then ended.  These financial statements are the responsibility of the Company’s management.  Our responsibility is to ex-
press an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States).  Those
standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements
are free of material misstatement.  The Company is not required to have, nor were we engaged to perform, an audit of its internal control
over financial reporting.  Our audit included consideration of internal control over financial reporting as a basis for designing audit pro-
cedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s
internal control over financial reporting.  Accordingly, we express no such opinion.  An audit also includes examining, on a test basis, ev-
idence supporting the amounts and disclosures in the consolidated financial statements and assessing the accounting principles used and
significant estimates made by management, as well as evaluating the overall financial statement presentation.  We believe that our audits
provide a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Solitario Explo-
ration & Royalty Corp. as of December 31, 2012 and 2011, and the results of their operations and their cash flows for the years then ended
in conformity with accounting principles generally accepted in the United States of America.

EKS&H LLLP
March 7, 2013
Denver, Colorado

22 | 2012 Annual Report

Consolidated Balance Sheets | in thousands of U.S. dollars, except share & per share amounts

December 31,
2012

December 31,
2011

Assets
Current assets:

Cash and cash equivalents
Investments in marketable equity securities, at fair value
Royalty sale receivable
Prepaid expenses and other
Total current assets

Mineral properties
Investments in marketable equity securities, at fair value
Equity method investment
Other assets

Total assets

Liabilities and Shareholders’ Equity
Current liabilities:

Accounts payable
Short-term margin loan
Current portion long-term debt
Deferred income taxes
Other

Total current liabilities

$

$

$

Long-term debt, net of discount
Deferred income taxes
Deferred gain on sale of mineral property
Warrant liability

Commitments and contingencies (Notes 2 and 8)

Shareholders’ equity:

Solitario shareholders’ equity

Preferred stock, $0.01 par value, authorized 10,000,000 shares 
(none issued and outstanding at December 31, 2012 and 2011)
Common stock, $0.01 par value, authorized, 100,000,000 shares 
(34,479,958 and 34,204,958, respectively, shares issued and 
outstanding at December 31, 2012 and 2011)

Additional paid-in capital
Accumulated deficit
Accumulated other comprehensive income
Total Solitario shareholders’ equity

Noncontrolling interest
Contra-noncontrolling interest
Total shareholders’ equity

Total liabilities and shareholders’ equity

$

616
3,110
4,000
210
7,936

9,327
3,983
1,165
1,072
23,483

398
1,500
727
963
103
3,691

2,437
-
7,000
1,138

-

345
47,107
(42,678)
3,914
8,688
529
-
9,217
23,483

On behalf of the Board:

Christopher E. Herald
Director

John Hainey
Director

See Notes to Consolidated Financial Statements.

$

$

$

$

432
4,361

-   

488
5,281

8,901
6,000
1,653
219
22,054

482
2,000
727
1,627
100
4,936

2,075
1,170
-  
-   

-

342
49,015
(39,381)
5,877
15,853
(1,640)
(340)
13,873
22,054

Solitario Exploration & Royalty Corp. | 23

Consolidated Statements of Operations | in thousands of U.S. dollars, except per share amounts

Property and joint venture revenue

Joint venture property payments

Costs, expenses and other:

Exploration expense
Depreciation and amortization
General and administrative 
Loss on derivative instruments
Property abandonment and impairment 
Gain on sale of assets
Interest expense and dividend income (net)

Total costs, expenses and other
Other income (expense)

Gain on sale of marketable equity securities
Loss on warrant liability
Equity in net loss of equity method investment

Total other income (expense)
Loss before income tax

Income tax benefit  

Net loss 

Less net loss attributable to noncontrolling interest

Net loss attributable to Solitario shareholders
Loss per common share attributable to 
Solitario shareholders:
Basic and diluted

Weighted average shares outstanding:

Basic and diluted 

For the year ended December 31,
2012

2011

$

300

$

242 

1,986
61
2,680
30
31
(8) 

318
5,098

1,528
(488)
(488)
552 
(4,246)
648
(3,598)
301 
(3,297)

(0.10)

34,351 

$

$

5,946 
46 
2,857 
137 
10 

-    

163 
9,159 

1,937 

-    

(623)
1,314 
(7,603)
635 
(6,968)
3,591
(3,377)

(0.10)

32,807 

$

$

See Notes to Consolidated Financial Statements.

24 | 2012 Annual Report

Consolidated Statements of Comprehensive Income (Loss) | in thousands of U.S. dollars

For the year ended December 31,
2011

2012

Net loss for the period, before comprehensive loss
Unrealized loss on marketable equity securities, 

net of deferred taxes

Comprehensive loss 

Comprehensive loss attributable to Solitario shareholders
Comprehensive loss attributable to noncontrolling interests
Comprehensive loss 

$

$

$

$ 

(3,598)

(1,963)
(5,561)

(5,260)
(301)
(5,561)

$

$

$

$

(6,968)

(5,909)
(12,877)

(9,286)
(3,591)
(12,877)

See Notes to Consolidated Financial Statements.

Solitario Exploration & Royalty Corp. | 25

Consolidated Statements of Shareholders’ Equity | in thousands of U.S. dollars, except share amounts

For the years ended December 31, 2012 and 2011

Solitario Shareholders’

Common Stock

Shares

Amount

Additional
Paid-in
Capital

Accumulated  
Other     

Total
Solitario

Non-

Accumulated Comprehensive Shareholders’ Controlling

Deficit

Income 

Equity

Interest

Contra-
Non-
Controlling
Interest

Total 
Shareholders’
Equity

Balance at 12/31/10  29,750,242

$ 297 $ 36,799 $ (36,996) $ 11,786 $ 11,886

$ 1,890

$       - $ 13,776

Cumulative effect 
of change in
accounting principle, 
net of deferred 
tax of $543
Issuance of shares 

for cash in public
offering, net of 
issuance costs 
of $838

Issuance of shares 

for royalty
buy-down

Issuance of shares 
and $200 of 
cash to noncontrolling 
shareholder for
future earn-in

Noncontrolling interest 

contribution

Loan to noncontrolling 

interest

Stock option expense
Issuance of shares
on exercise 
of stock options
Accrued interest on 

advance to
noncontrolling interest

Net loss 
Net unrealized 

(loss) on 
marketable equity
securities (net of 
tax of $3,516)

Balance at 12/31/11

344,116

50,000

-

-
-

150,600

-
-

-  
34,204,958

-  

-  

1,240

992

-  

2,232

3,910,000

39

8,898

-

-

-

-

-
-

-

997

139

-

-
697

245

3

1

-

-
-

2

-
-

-  
-  

-
(3,377)

-  

-  

-  

-  

2,232

-  

-  

8,937

1,000

8,937

1,000

140

-  

(340)

-  

584

-
697

247

(504)
-  

-  

-  
(3,377)

(19)
(3,591)

-  

-  
-  

-  

-  
-  

(200)

584

(504)
697

247

(19)
(6,968)

-  

-  

-  

-  

-
-  

-  

-  
-  

-  

(5,909)
$ 342 $ 49,015 $ (39,381) $   5,877 $ 15,853

(5,909)

-  

-  

-    

$(1,640)

-    

(5,909)
$ (340) $ 13,873

Issuance of shares and 
$300 of cash to 
noncontrolling 
shareholder for future 
earn-in

Noncontrolling interest 
contribution (net)

Disproportionate share entry
on earn-in to MH-LLC

Reversal of contra-

noncontrolling interest
on earn-in

Stock option expense
Issuance of shares in 
private placement

Net loss 
Net unrealized (loss) 

on marketable equity
securities (net of 
tax of $1,168)

50,000

-  

-  

-  
-  

225,000
-  

-  

1

-  

-  

-  
-  

2
-  

-  

70

-  

(2,983)

-  
732

273
-  

-  

-  

-  

-  
-  

-  
(3,297)

-  

-  

-  

-  
-  

-  
-  

71

-  

(180)

198

(2,983)

2,983

-  
732

275
(3,297)

(531)
-  

-  
(301) 

(191)

-  

-  

531
-  

(300)

198

-  

-  
732

-  
-  

275
(3,598)

-  

-  

(1,963)

(1,963)

-    

-    

(1,963)

Balance at 12/31/12

34,479,958

$ 345 $ 47,107 $ (42,678) $  3,914  $  8,688

$    529

$       -   $   9,217

See Notes to Consolidated Financial Statements.

26 | 2012 Annual Report

Consolidated Statements of Cash Flows | in thousands of U.S. dollars

Operating activities:

Net loss 
Adjustments to reconcile net loss to net cash used in 

operating activities:

Loss on derivative instruments
Depreciation and amortization
Loss on equity method investment
Property abandonment and impairment 
Employee stock option expense 
Deferred income taxes
Loss on warrant liability
Amortization of interest on debt discounts
Gain on asset and equity security sales
Changes in operating assets and liabilities:

Prepaid expenses and other current assets
Accounts payable and other current liabilities

Net cash used in operating activities

Investing activities:

Additions to mineral properties
Additions to other assets
Sale of derivative instrument, net
Proceeds from sale of mineral property
Proceeds from sale of marketable equity securities
Proceeds from sale of other assets

Net cash provided by investing activities

Financing activities:

Short-term borrowing
Repayment of short-term borrowing
Repayment of long-term debt
Proceeds from issuance of debt, net
Proceeds from issuance of common stock, net
Proceeds from exercise of options
Payment to noncontrolling interest
Noncontrolling interest contribution, net

For the year ended December 31,
2012

2011

$

(3,598)

$

(6,968)

30
61
488
31
732
(648)
488
332
(1,536)

200
(84)
(3,504)

(3,457)
(397)
51
6,000
1,664
9
3,870

2,665
(3,165)
(750)
912
275
-
(300)
181
(182)

184
432
616

137 
46 
623 
10 
697 
(635)
-   

217 
(1,937)

(2)
(119)
(7,931)

(1,765)
(119)
42 
-   
2,035 

-   

193 

1,075 
(1,947)
(500)
-   
8,937 
247 
(200)
80 
7,692 

(46)
478
432 

$  

Net cash provided by (used in) financing activities

Net increase (decrease) in cash and cash equivalents
Cash and cash equivalents, beginning of year
Cash and cash equivalents, end of year

$  

Supplemental disclosure of cash flow information:

Cash paid for interest

Supplemental disclosure of non-cash flow investing 

and financing activities:
Royalty sale receivable
Transfer of contra-noncontrolling interest to 

noncontrolling interest upon earn-in

Disproportionate share entry from noncontrolling 

interest to additional paid-in capital upon earn-in

Debt financing costs
Issuance of stock to noncontrolling interest
Acquisition of mineral properties for stock
Loan to noncontrolling interest
Reclassification of stock option liability to 

additional paid-in capital, $1,240 and to retained
earnings, $992, net of deferred taxes of $543 upon 
change in accounting principle

$    

87

$    

71 

$

$  

$
$  
$  
$  
$  

$  

4,000

531

2,983
588
71
-
-

-

$  

$ 

$ 
$ 
$ 
$
$ 

$

-  

- 

- 
- 
140 
1,000 
504 

2,775 

See Notes to Consolidated Financial Statements. 

Solitario Exploration & Royalty Corp. | 27

Notes to Consolidated Financial Statements | for the years ended December 31, 2012 and 2011

1. Business and Summary of Significant 

Accounting Policies:
Business and Company Formation
Solitario Exploration & Royalty Corp. (“Solitario”) is a develop-
ment stage company at December 31, 2012 (but not a company in
the “Development Stage”) as a result of the completion of a feasi-
bility study on its Mt. Hamilton project (the “Feasibility Study”)
prepared by SRK Consulting (US), Inc. of Lakewood, Colorado
(“SRK”).  Solitario intends to develop the Mt. Hamilton project.
However, Solitario has never developed a mineral property.  In ad-
dition Solitario has a focus on the acquisition of precious and base
metal properties with exploration potential and the development
or purchase of royalty interests.  Solitario acquires and holds a
portfolio of exploration properties for future sale or joint venture or
to create a royalty prior to the establishment of proven and proba-
ble reserves.  

Solitario has been actively involved in mineral exploration since
1993.  Although Solitario records joint venture property payments
as revenue for standby delay rental payments, Solitario’s last signif-
icant revenues were recorded in 2000 upon the sale of the Yana-
cocha property for $6,000,000.  During 2012 Solitario sold a royalty
on its Mt. Hamilton project for $10,000,000 and recorded a de-
ferred gain on that sale of $7,000,000.  Future revenues from the
sale of properties, if any, would also occur on an infrequent basis in
the future.  At December 31, 2012, in addition to its Mt. Hamilton
project, Solitario had nine mineral exploration properties in the
United States, Peru, Mexico and Brazil and its Yanacocha and Mer-
curio royalty properties in Peru and Brazil, respectively. Solitario is
conducting exploration activities in all of those countries.  

Solitario was incorporated in the state of Colorado on November 15,
1984 as a wholly owned subsidiary of Crown Resources Corporation
(“Crown”).  In July 1994, Solitario became a publicly traded com-
pany on the Toronto Stock Exchange (the “TSX”) through its Initial
Public Offering.  

Recent Developments
Mt. Hamilton Feasibility Study
In December 2010 Solitario signed the Limited Liability Company
Operating Agreement of Mt. Hamilton LLC, (the “MH Agreement”),
with Ely Gold and Minerals, Inc. (“Ely”) and formed Mt. Hamilton
LLC (“MH-LLC”), the owner of the Mt. Hamilton project.  Solitario
announced on February 22, 2012 the completion of the Feasibility
Study.  As a result of the completion of the Feasibility Study, pur-
suant to the MH Agreement, Solitario earned an 80% interest in
MH-LLC and reported mineral reserves at its Mt. Hamilton project.
See Note 2, “Mineral Properties,” below.

RMB Facility Agreement
As explained in more detail in Note 4, “Long-term debt,” Solitario
entered into a Facility Agreement (the “Facility Agreement”) with
RMB  Australia  Holdings  Limited,  an  Australian  corporation
(“RMBAH”), and RMB Resources Inc., a Delaware corporation
(“RMBR”) whereby Solitario may borrow up to $5,000,000 from
RMBAH (with any amounts outstanding collectively being the
“RMB Loan”).  Solitario borrowed $1,500,000 on August 21, 2012.
Solitario paid an arrangement fee of $250,000 upon initial funding.

The RMB Loan matures on the earlier to occur of (i) 36 months
from the date of initial funding or (ii) the date on which financing
is  made  available  to  MH-LLC  for  purposes  of  placing  the  Mt.
Hamilton project into commercial production.  The RMB Loan
amounts bear interest at the 90-day LIBOR rate plus 5%, payable
in arrears on the last day of each quarterly interest period.  The
RMB  Loan  may  be  repaid  at  any  time  without  penalty.    Any
amounts repaid may not be redrawn under the Facility Agreement.
The RMB Loan is secured by a lien on Solitario’s 80% interest in
MH-LLC as well as a general security interest in Solitario’s re-
maining assets.

RMB Warrants
Pursuant to the Facility Agreement, Solitario issued 1,624,748 war-
rants (the “RMB Warrants”) to RMBAH as partial consideration for
financing services provided in connection with the Facility Agree-
ment. Each RMB Warrant entitles the holder to purchase one share
of Solitario common stock (the “Warrant Shares”) pursuant to the
terms and conditions of the RMB Warrants. The RMB Warrants ex-
pire 36 months from their date of issuance and have an exercise
price of $1.5387 per Warrant Share, subject to customary anti-di-
lution adjustments.    

Sandstorm Royalty Sale
On June 11, 2012, MH-LLC completed the sale of a 2.4% net
smelter returns royalty (“NSR”) on the Mt. Hamilton project to
Sandstorm Gold, Ltd (“Sandstorm”) for US$10,000,000.  MH-
LLC received an upfront payment of US$6,000,000 upon signing
the agreement and received US$4,000,000 on January 15, 2013,
which Solitario has recorded as a current asset as of December
31, 2012.  As part of the agreement, MH-LLC will have the op-
tion, for a period of 30 months from June 11, 2012 to repurchase
the NSR for US$12,000,000, provided that MH-LLC enters into
a gold stream agreement with Sandstorm that has an upfront de-
posit of greater than US$30,000,000. In addition, MH-LLC has
provided Sandstorm with a right of first refusal on any future roy-
alty or gold stream financing for the Mt. Hamilton project.   Pur-
suant to the Agreement, Solitario is jointly and severally liable
for all obligations of MH-LLC to Sandstorm.  See Note 2, “Min-
eral Properties,” below for further discussion of the Sandstorm
royalty sale.

Investment in Kinross
Solitario has a significant investment in Kinross Gold Corporation
(“Kinross”), which consisted of the following at December 31, 2012
and December 31, 2011:

(in thousands)                     Year ended December 31,

Shares
Fair value

Current assets
Long-term assets

2012
670 

2011
850

$
$

3,110 
3,402 

$
$

4,361
5,329

The current assets represent Solitario’s estimate of the portion of
marketable equity securities that will be liquidated within one year.
Solitario sold the following shares of Kinross during 2012 and 2011:

28 | 2012 Annual Report

Notes | to Consolidated Financial Statements continued

(in thousands)                       Year ended December 31,

Shares sold
Proceeds
Gain on sale

2012
180
1,591
1,464

$
$

2011
130
2,035
1,937

$
$

As  of  December  31,  2012  and  2011,  Solitario  has  borrowed
$1,500,000 and $2,000,000, respectively, in short-term margin
loans, which are primarily secured by its investment in Kinross.
The  short-term  margin  loan  is  discussed  below  under  Note  3,
“Short-term  debt.”    As  of  February  28,  2013,  Solitario  owns
670,000 shares of Kinross common stock which have a value of ap-
proximately $5.1 million based upon the market price of $7.62 per
Kinross share.  Solitario’s investment in Kinross common stock rep-
resents a significant concentration of assets, with the inherent risk
that entails.  Any significant fluctuation in the market value of Kin-
ross common shares could have a material impact on Solitario’s liq-
uidity and capital resources.

Financial Reporting
The consolidated financial statements include the accounts of Soli-
tario  and  its  wholly  owned  subsidiaries,  controlled  non-wholly
owned subsidiaries and its equity investment in Pedra Branca Min-
eracao,  Ltd  (“PBM”),  which  owns  the  Pedra  Branca  project  in
Brazil.  All significant intercompany accounts and transactions have
been eliminated in consolidation.  The consolidated financial state-
ments are prepared in accordance with accounting principles gen-
erally  accepted  in  the  United  States  of  America  (“generally
accepted accounting principles”), and are expressed in US dollars.

Revenue Recognition
Solitario records delay rental payments as revenue in the period re-
ceived.  Solitario recorded $300,000 and $242,000, respectively, in
joint venture and property payments for the years ended December
31, 2012 and 2011.  Any payments received for the sale of property
interests are recorded as a reduction of the related property’s cap-
italized cost.  Proceeds which exceed the capitalized cost of the
property without reserves are recognized as revenue.  Payments re-
ceived on the sale of properties with reserves are recognized as rev-
enue to the extent the proceeds exceed the proportionate basis in
the assets sold.  Gain on the sale of a mineral property revenue
stream is deferred to the extent there is a guarantee for the future
revenue stream until such time as the potential funding obligation
for the guarantee is reduced or released to the extent Solitario no
longer has any involvement of obligations.  

Use of Estimates
The preparation of financial statements in conformity with gener-
ally accepted accounting principles requires management to make
estimates and assumptions that affect the reported amounts of as-
sets and liabilities and disclosure of contingent assets and liabil-
ities  at  the  date  of  the  financial  statements  and  the  reported
amounts of revenues and expenses during the reporting period.
Actual results could differ from those estimates.  Some of the more
significant estimates included in the preparation of Solitario’s fi-
nancial statements pertain to: (i) the recoverability of mineral prop-
erties and their future exploration potential; (ii) the estimate of the
fair value of Solitario’s stock option grants to employees; (iii) the

ability of Solitario to realize its deferred tax assets; (iv) the current
portion of Solitario’s investment in Kinross stock and other mar-
ketable equity securities; (v) the fair value of Solitario’s liability
for the RMB warrants.  

In performing its activities, Solitario has incurred certain costs for
mineral properties.  The recovery of these costs is ultimately de-
pendent upon the sale of mineral property interests or the develop-
ment of economically recoverable ore reserves and the ability of
Solitario to obtain the necessary permits and financing to success-
fully place the properties into production, and upon future prof-
itable operations, none of which is assured.

Cash Equivalents 
Cash equivalents include investments in highly liquid money mar-
ket securities with original maturities of three months or less when
purchased.  As of December 31, 2012 and 2011, Solitario had con-
centrations of cash and cash equivalents in excess of federally in-
sured amounts and cash in foreign banks, which are not covered
under the federal deposit insurance rules for the United States.  

Mineral Properties  
Solitario began capitalization of all of its expenditures on its Mt.
Hamilton project, subsequent to the completion of the Feasibility
Study.  Solitario expenses all exploration costs incurred on its min-
eral properties prior to the establishment of proven and probable re-
serves.    Initial  acquisition  costs  of  its  mineral  properties  are
capitalized.  Solitario regularly performs evaluations of its invest-
ment in mineral properties to assess the recoverability and/or the
residual value of its investments in these assets.  All long-lived as-
sets are reviewed for impairment whenever events or circumstances
change which indicate the carrying amount of an asset may not be
recoverable, utilizing established guidelines based upon undis-
counted future net cash flows from the asset or upon the determi-
nation that certain exploration properties do not have sufficient
potential for economic mineralization.  

Derivative Instruments
Solitario accounts for its derivative instruments in accordance with
ASC 815, “Accounting for Derivative Instruments and Hedging Ac-
tivities” (“ASC 815”).  Beginning in December 2008, Solitario sold
covered calls covering its shares of Kinross common stock.  Solitario
also owned certain warrants issued by Ely, which expired unexer-
cised during 2012.  Solitario issued the RMB Warrants during 2012.
Solitario has not designated its covered calls as hedging instruments
and any changes in the fair market value of the covered calls and
its warrants are recognized in the statement of operations in the pe-
riod of the change.  See Note 6, “Derivative instruments” below.  

Fair Value
FASB  ASC  820,  “Fair  Value  Measurements  and  Disclosures”
(“ASC 820”) establishes a framework for measuring fair value and
requires enhanced disclosures about fair value measurements. ASC
820 clarifies that fair value is an exit price, representing the amount
that would be received to sell an asset or paid to transfer a liability
in an orderly transaction between market participants.  For certain
of Solitario’s financial instruments, including cash and cash equiv-
alents, short-term margin loans and accounts payable, the carrying

Solitario Exploration & Royalty Corp. | 29

Notes | to Consolidated Financial Statements continued

amounts approximate fair value due to their short-term maturities.
Solitario’s marketable equity securities and the Kinross calls are
carried at their estimated fair value based on quoted market prices.
See Note 7, “Fair value of financial instruments” below.    

Marketable Equity Securities
Solitario’s investments in marketable equity securities are classified
as available-for-sale and are carried at fair value, which is based
upon quoted prices of the securities owned.  The cost of marketable
equity securities sold is determined by the specific identification
method.  Changes in market value are recorded in accumulated
other comprehensive income within shareholders’ equity, unless a
decline in market value is considered other than temporary, in
which case the decline is recognized as a loss in the consolidated
statements of operations.  The following tables summarize Solitario’s
marketable equity securities and accumulated other comprehen-
sive income related to its marketable equity securities:

(in thousands)                                   December 31,

Marketable equity securities 

at fair value

Cost
Accumulated other 

comprehensive income for
unrealized holding gains

Deferred taxes on accumulated 

other comprehensive
income for unrealized holding gains

Accumulated other comprehensive 

2012

2011

$

7,093 
851 

$ 10,361 
988 

6,242  

9,373 

2,328 

3,496 

income

$

3,914 

$

5,877 

The following table represents changes in marketable equity secu-
rities:  

(in thousands)                     Year ended December 31,

Gross cash proceeds 
Cost 
Gross gain on sale included in 
earnings during the period
Deferred taxes on gross gain 

on sale included in earnings
Reclassification adjustment to 
unrealized gain in other 
comprehensive income for net 
gains included in earnings
Gross unrealized holding loss 

arising during the period included
in other comprehensive loss
Deferred taxes on unrealized 
holdings loss included in
other comprehensive loss 

Net unrealized holding gain (loss)
Other comprehensive income (loss)
from marketable equity securities

$

2012
1,664 
136 

$

2011
2,035 
98 

1,528 

1,937 

(571)

(722)

(957)

(1,215)

(1,603)

(7,488)

597 
(1,006)

2,794 
(4,694)

$ (1,963)

$ (5,909)

Foreign Exchange
The United States dollar is the functional currency for all of Soli-
tario’s foreign subsidiaries.  Although Solitario’s South American
exploration activities have been conducted primarily in Brazil, Peru
and Mexico, a portion of the payments under the land, leasehold
and exploration agreements of Solitario are denominated in United
States dollars. Foreign currency gains and losses are included in
the results of operations in the period in which they occur.  During
2012  and  2011,  Solitario  recorded  foreign  exchange  losses  of
$32,000 and $43,000, respectively.  Solitario’s cash accounts in for-
eign subsidiaries not denominated in United States dollars repre-
sent  the  only  significant  foreign  currency  denominated  assets.
Foreign currency denominated cash accounts totaled $36,000 and
$325,000, respectively, at December 31, 2012 and 2011.  

Equity Method Investments
Solitario accounts for its investment in Pedra Branca do Mineracao,
Ltd. (“PBM”) under the equity method as of July 21, 2010, when
Anglo Platinum Limited (“Anglo”) earned a 51% interest in PBM.
Solitario elected not to record its investment in PBM at fair value
after July 21, 2010, and during 2012 and 2011 recorded a reduction
of $488,000 and $623,000, respectively, in its equity method invest-
ment for Solitario’s share of the loss of PBM during 2012 and 2011.  

Income Taxes
Solitario accounts for income taxes in accordance with ASC 740,
“Accounting for Income Taxes.”  Under ASC 740, income taxes are
provided for the tax effects of transactions reported in the financial
statements and consist of taxes currently due plus deferred taxes re-
lated to certain income and expenses recognized in different peri-
ods for financial and income tax reporting purposes.  Deferred tax
assets and liabilities represent the future tax return consequences
of those differences, which will either be taxable or deductible when
the assets and liabilities are recovered or settled.  Deferred taxes are
also recognized for operating losses and tax credits that are avail-
able to offset future taxable income and income taxes, respectively.
A valuation allowance is provided if it is more likely than not that
some portion or all of the deferred tax assets will not be realized.

Accounting for Uncertainty in Income Taxes 
ASC 740 clarifies the accounting for uncertainty in income taxes
recognized in a company’s financial statements. ASC 740 prescribes
a recognition threshold and measurement attribute for the financial
statement recognition and measurement of a tax position taken or
expected to be taken in a tax return. ASC 740 also provides guid-
ance on derecognition, classification, interest and penalties, ac-
counting in interim periods, disclosure, and transition. ASC 740
provides that a company’s tax position will be considered settled if
the taxing authority has completed its examination, the company
does not plan to appeal, and it is remote that the taxing authority
would reexamine the tax position in the future. These provisions of
ASC 740 had no effect on Solitario’s financial position or results of
operations. See Note 5, “Income taxes” below.

Earnings per Share
The calculation of basic and diluted loss per share is based on the
weighted average number of common shares outstanding during the
years ended December 31, 2012 and 2011.  Potentially dilutive

30 | 2012 Annual Report

Notes | to Consolidated Financial Statements continued

shares related to outstanding common stock options of 2,598,400
and 2,433,400 for the years ended December 31, 2012 and 2011,
respectively, and RMB warrants of 1,624,748 for the year ended
December 31, 2012 were excluded from the calculation of diluted
loss per share because the effects were anti-dilutive.

Employee Stock Compensation Plans
In April 2010 the FASB issued ASU No. 2010-13, which addresses
the classification of a share-based payment award with an exercise
price denominated in the currency of a market in which the under-
lying equity security trades. ASC 718 was amended to clarify that
a share-based payment award with an exercise price denominated
in the currency of a market in which a substantial portion of the en-
tity’s equity securities trade shall not be considered to contain a
market, performance or service condition. Therefore, such an award
is not to be classified as a liability if it otherwise qualifies for eq-
uity classification. The amendments in ASU 2010-13 are effective
for fiscal years, and interim periods within those fiscal years, begin-
ning on or after December 15, 2010, with early application permit-
ted.  Prior to the adoption of ASU 2010-13, Solitario classified its
stock options as liabilities as they are priced in Canadian dollars
and Solitario’s functional currency is United States dollars.  Begin-
ning January 1, 2011, Solitario classifies its options as equity op-
tions, in accordance with ASU 2010-13 and no longer records a
liability for the fair value of its outstanding options.  In accordance
with ASU 2010-13, this change has been made on a prospective
basis as of January 1, 2011 with a reduction to stock option liabil-
ity  of  $2,775,000,  an  increase  to  additional  paid-in  capital  of
$1,240,000 and a reduction in accumulated deficit of $992,000,
net of deferred taxes of $543,000 as a cumulative effect of a change
in accounting principle.   The adoption of ASU 2010-13 had the ef-
fect of increasing the 2011 net loss and basic and diluted earnings
per share by $524,000 and $0.02 per share, respectively, by no
longer accounting for its options as liabilities.  See Note 9, “Em-
ployee stock compensation plans” below.  

Solitario’s outstanding options on the date of grant have a five-year
term, and vest 25% on date of grant and 25% on each anniversary
date.  Solitario recognizes stock option compensation expense based
upon the grant date fair value of the awards and as the stock options
vest by multiplying the estimated grant date fair value determined
using the Black-Scholes model by a vesting percentage, with 25%
recognized immediately, and the remaining 75% recognized over
three years on a straight line basis.         

Segment Reporting
With the completion of the Feasibility Study on February 22, 2012,
Solitario now operates in two segments, (i) mineral exploration and
(ii) mining development and operations.  Solitario is capitalizing
Mt. Hamilton development and operations costs subsequent to
February 22, 2012.  At December 31, 2012, Solitario’s Mt. Hamil-
ton project is located in Nevada and all of Solitario’s remaining op-
erations  are  located  in  Peru,  Brazil  and  Mexico  as  further
described in Note 2 to these consolidated financial statements.  In-
cluded in the consolidated balance sheet at December 31, 2012
and 2011 are total assets of $1,433,000 and $2,251,000, respec-
tively, related to Solitario’s foreign operations including its invest-
ment in PBM, located in Brazil, Peru and Mexico. Solitario is not

aware of any foreign exchange restrictions on its subsidiaries lo-
cated in foreign countries.

Recent Accounting Pronouncements
There  are  no  recently  issued  accounting  standards  for  which 
Solitario expects a material impact on its consolidated financial
statements.

2. Mineral Properties: 
The  following  table  details  Solitario’s  investment  in  Mineral 
Property:

(in thousands)                                  December 31,

Development (United States)

Mt. Hamilton

Exploration

Cerro Azul (Peru)
La Promesa (Peru)
Atico (Peru)
Pachuca (Mexico)
Norcan (Mexico)
Aconchi (Mexico)
Canta Colorado (Mexico)
Jaripo (Mexico)
Excelsior (Peru)
Triunfo (Bolivia)
Espanola (Bolivia)
Total exploration
Total mineral property

2012

2011

$

9,275 

$

8,821 

3 
5 
5 
20 
6 
5 
3 
5 
-   
-  
-   
52 
9,327

$

3 
5 
5 
20 
6 
5 
-   
5 
6 
20 
5 
80 
8,901 

$

Mt. Hamilton
Formation of MH-LLC Joint Venture of the Mt. Hamilton Project
On November 12, 2010, Solitario made an initial contribution of
$300,000 for a 10% interest in, upon the formation of, MH-LLC
which was formed in December 2010.   Pursuant to the MH Agree-
ment, the fair value of the DHI-US contribution was valued at
$3,000,000 for its 90% interest and MH-LLC assumed $3,066,000
for the fair value of the Augusta Resources Corporation (“Augusta”)
debt, discussed below in Note 4, “Long-term debt.”

Feasibility Study
On February 22, 2012, Solitario announced the completion of the Fea-
sibility Study on its Mt. Hamilton project prepared by SRK.  As a re-
sult of the completion of the Feasibility Study, Solitario earned an 80%
interest in MH-LLC, and intends to develop the Mt. Hamilton project,
subject to a number of factors including obtaining necessary permits
and availability of required capital, none of which is currently in place.  

MH Agreement
The MH Agreement provides that if Solitario completes a bankable
feasibility study and earns an 80% interest in MH-LLC, as of that
date, Solitario will be obligated to make any unpaid payments of cash
and stock to DHI-US, investments into Ely and any unpaid payments
to the underlying royalty holder by the due dates prescribed in the
MH Agreement, or will be subject to dilution of its interest in MH-
LLC.  If Solitario fails to make any of the remaining required pay-
ments due after December 31, 2012, Solitario will be diluted from

Solitario Exploration & Royalty Corp. | 31

Notes | to Consolidated Financial Statements continued

its current 80% ownership interest, to a 49% interest in MH-LLC
and DHI-US will increase its ownership interest to 51%.  Further-
more, the MH Agreement provides that all costs for development at
Mt. Hamilton after completion of the Feasibility Study will be shared
by Solitario and DHI-US pro rata.  Upon completion of the feasibil-
ity study, DHI-US notified Solitario that it had exercised its option of
having Solitario contribute DHI-US’s share of costs through commer-
cial completion as a loan, with such loan, plus interest at 8%, being
repaid to Solitario from 80% of DHI-US’s share of distributions from
MH-LLC.  During 2012, Solitario loaned DHI-US $127,000 for its
share of costs subsequent to the completion of the Feasibility Study.
However, subsequently, DHI-US repaid Solitario $131,000 for the
remaining balance due on the loan from Solitario, including interest,
and has no balance due to Solitario as of December 31, 2012.

During 2012, MH-LLC distributed $2.5 million to its members in
proportion to their interests.  Solitario received $2 million from this
distribution which was eliminated in consolidation.  In addition
Solitario received $500,000 from DHI-US to repay a portion of a
prior loan to Solitario, and Solitario agreed to forgive $35,000 of ac-
crued interest due from DHI-US, which represented the accrued
interest  on  loans  made  to  DHI-US  in  connection  with  the  MH
Agreement through June 30, 2012.  Including accrued interest of
$17,000  prior  to  the  repayment  of  the  DHI-US  loan,  Solitario
recorded a net decrease to interest income of $18,000 for the inter-
est earned and forgiven during 2012.

During 2012, Solitario and DHI-US agreed to modify the terms of
the MH Agreement whereby certain continuing payment obliga-
tions  of  Solitario  pursuant  to  the  MH  Agreement  totaling
$5,000,000 to buy down the production royalty payable to Centen-
nial Minerals Company LLC (“CMC”) will now be payable on or
prior to the date of commencement of commercial production at the
Mt. Hamilton project.  Previously, the MH Agreement obligated
Solitario to make the continuing payment obligations to CMC of
$3,500,000 on or before November 13, 2013 and $1,500,000 on or
before November 13, 2014.  

Sandstorm Royalty Sale
In June 2012, MH-LLC completed the sale of a 2.4% NSR on its
Mt. Hamilton project to Sandstorm for $10 million.  MH-LLC re-
ceived an upfront payment of US$6 million upon signing the agree-
ment  and  received  US$4  million  on  January  15,  2013,  which
Solitario has recorded as a current asset as of December 31, 2012.
In determining the initial fair value of the Sandstorm receivable,
Solitario has classified the receivable from Sandstorm as a Level 3
asset, in as much as there were no observable independent inputs
to determine the fair value.  Solitario recorded a deferred gain as a
long-term  liability  on  the  sale  of  the  Sandstorm  royalty  of
$7,000,000 during 2012.  In determining the gain on sale of the
Sandstorm royalty, Solitario determined the basis in the property
sold primarily based upon the purchase of a 2% royalty on the same
property in May of 2011 for consideration of $2,500,000.  In addi-
tion Solitario reviewed the relative fair values of the royalty sold to
the assets retained, and applied that percentage to its existing cap-
italized costs at Mt. Hamilton.  Solitario considers the basis of
$3,000,000  for  the  royalty  sold  reasonable  based  upon  this 
analysis.  The Sandstorm royalty agreement provides that in the

event Sandstorm does not receive $10 million in royalty proceeds
by December 31, 2022, MH-LLC will make up any shortfall.  As a
result of this guarantee, Solitario believes it is appropriate to defer
the gain on sale, until such time as the potential funding obligation
under the guarantee is reduced or eliminated.

As part of the agreement, MH-LLC will have the option, for a pe-
riod of 30 months from the date of the agreement to repurchase the
NSR for $12 million, provided that MH-LLC enters into a gold
stream agreement with Sandstorm that has an upfront deposit of
greater than $30 million. In addition, MH-LLC has provided Sand-
storm with a right of first refusal on any future royalty or gold stream
financing for the Mt. Hamilton project. Pursuant to the agreement,
Solitario is jointly and severally liable for all obligations of MH-
LLC to Sandstorm.

Capitalized Costs
Solitario began capitalizing its development costs incurred at its
Mt. Hamilton project subsequent to the completion of the Feasibil-
ity Study.  During 2012, Solitario capitalized $3,129,000 of devel-
opment costs at the Mt. Hamilton project.  In addition, during 2012,
Solitario capitalized $325,000 of lease payments to mineral prop-
erties related to Mt. Hamilton.  Also during 2012, Solitario capital-
ized  $300,000  of  advance  royalty  payments  to  an  underlying
leaseholder as long-term other assets.

Exploration Property
Solitario’s exploration mineral properties at December 31, 2012
consist of use rights related to exploration stage properties, and the
value of such assets is primarily driven by the nature and amount
of economic mineral ore believed to be contained, or potentially
contained, in such properties.  The amounts capitalized as mineral
properties include concession and lease or option acquisition costs.
Capitalized costs related to a mineral property represent its fair
value at the time it was acquired.  At December 31, 2012, none of
Solitario’s exploration properties have production (operating) or con-
tain proven or probable reserves.  Solitario’s exploration mineral
properties represent interests in properties that Solitario believes
have exploration and development potential.  Solitario’s mineral use
rights generally are enforceable regardless of whether proven and
probable reserves have been established.   

In addition to its capitalized exploration properties, Solitario has an
interest in its Bongará and Pedra Branca exploration concessions,
which are currently subject to joint venture agreements.  Solitario
records joint venture property payment revenue received in excess
of capitalized costs.  At December 31, 2012 and 2011, neither of
these properties have any remaining capitalized costs.  

Solitario also sold its mineral interests in its Yanacocha and Mer-
curio exploration projects and retained a royalty interest in each.
Solitario has no capitalized costs related to these royalty interests.

Discontinued Projects 
During 2012, Solitario recorded $31,000 of mineral property min-
eral property write-downs related to its Excelsior, Triunfo and Es-
panola  projects.    During  2011,  Solitario  recorded  $10,000  of
mineral property write-downs related to its Paria Cruz property.       

32 | 2012 Annual Report

Notes | to Consolidated Financial Statements continued

Exploration Expense
The following items comprised exploration expense:

(in thousands)                      
Geologic and field expenses
Administrative
Mt. Hamilton exploration 

Total exploration expense 

2012
1,307 
378 
301 
1,986 

$

$

2011
1,922 
324 
3,700 
5,946 

$

$

3. Short-term Debt:
Solitario entered into a secured credit line agreement with UBS
Bank, USA (“UBS Bank”).  At December 31, 2012, the credit line
is secured by all of Solitario’s assets held in its UBS brokerage ac-
count, consisting primarily of 460,000 Kinross shares.  The UBS
Bank credit line carries an interest rate which floats, based upon a
base rate of 2.25% plus the one-month London Interbank Offered
Rate (“LIBOR”), which is 0.27% as of December 31, 2012.  The
average interest rate was approximately 2.49% and 2.48%, respec-
tively, for 2012 and 2011.  UBS Bank may change the base rate at
any time. The UBS Bank credit line provides that Solitario may bor-
row up to $2 million and that Solitario maintain a minimum equity
value percentage in its UBS brokerage account above 40%, based
upon the value of its Kinross shares and any other assets held in
Solitario’s UBS brokerage account, less the value of its UBS Bank
credit line and any other balances owed to UBS Bank. UBS Bank
may modify the minimum equity value percentage of the loan at
any time. In addition, if the equity value in Solitario’s UBS broker-
age account falls below the minimum equity value, UBS Bank may
sell enough Kinross shares held in Solitario’s UBS brokerage ac-
count or liquidate any other assets to restore the minimum equity
value.  At December 31, 2012, the equity value in Solitario’s UBS
brokerage account was 67%.     

Solitario also maintains a short-term margin account with RBC Cap-
ital Markets, LLC (“RBC”).  At December 31, 2012, the credit line
is secured by all of Solitario’s assets held in its RBC brokerage ac-
count, consisting primarily of 210,000 of Solitario’s Kinross shares.
Solitario has utilized short-term margin loans from RBC, using Soli-
tario’s investment in Kinross held at RBC as collateral for the short-
term margin loans.  During 2012, the loans carried interest at a
margin loan rate of 4.25% per annum, which floats based upon the
London Interbank Offered Rate. The margin loan rate can be mod-
ified by RBC at any time. The margin loans are callable by RBC at
any time.  Per the terms of the margin loans, Solitario is required to
maintain a minimum equity value in the account of 35%, based
upon the value of its Kinross shares and any other assets held at
RBC, less any short-term margin loan balance and any other bal-
ances owed to RBC. The equity value percentage may be modified
by RBC at any time. If the equity value in Solitario’s account at
RBC falls below the minimum, RBC may call the loan, or may sell
enough Kinross shares held in Solitario’s brokerage account or liq-
uidate any other assets to restore the minimum equity value.   At
December 31, 2012, Solitario had no outstanding borrowing on the
RBC margin account and the equity balance in Solitario’s account
at RBC was 100%.  

The following tables summarize Solitario’s short-term debt:

(in thousands)                                   December 31,

UBS short-term credit line 

Beginning balance

Borrowing
Repayments
Ending balance

RBC short-term margin loan

Beginning balance

Borrowing
Repayments
Ending balance

2012

2011

$

2,000
1,200
(1,700)
1,500

$

1,918
82

-   

2,000

-   

1,465
(1,465)
-   

905
1,000
(1,905)
- 
2,000

Total short-term margin loans

$

1,500   $

(in thousands)                    Year ended December 31,

Interest expense UBS 
short-term credit line 
Interest expense RBC 
short-term margin loan

Total interest expense, 

short-term margin loans

2012

2011

$

$

36 

$

22 

58 

$

50 

21 

71 

4. Long-term Debt:
Augusta Long-term Debt
In connection with the formation of MH-LLC, the Mt. Hamilton
properties contributed by DHI-US to MH-LLC were subject to a
security interest granted to Augusta related to Ely’s acquisition of
the Mt. Hamilton properties.  Pursuant to the MH Agreement, as
part of its earn-in, Solitario agreed to make private placement in-
vestments totaling $2,500,000 in Ely common stock, all to provide
Ely with the funds necessary for DHI-US to make the loan pay-
ments due to Augusta as discussed below in Note 10, “Ely Gold in-
vestment and the Mt. Hamilton joint venture.”  The payments due
to Augusta are non-interest bearing.  Accordingly, upon formation
and the contribution of the mineral properties by DHI-US to MH-
LLC, MH-LLC recorded discounted fair value of the payments due
to Augusta, discounted at 7.5%, which was Solitario’s estimated
cost of similar credit as of the formation of MH-LLC.   

The following is the schedule of debt payments due to Augusta as
of December 31, 2012 and 2011:

December 31,

Payment date
June 1, 2012
June 1, 2013
June 1, 2014
June 1, 2015
Unamortized discount
Total 
Current portion
Long-term debt

$

2012

2011
- $ 750,000
750,000
750,000
1,000,000
(448,000)
2,802,000
727,000
$1,509,000  $ 2,075,000

750,000
750,000
1,000,000
(264,000)
2,236,000
727,000

During 2012 and 2011 Solitario recorded $184,000 and $217,000,
respectively, for accretion of interest expense related to the Augusta
note and paid $750,000 and $500,000, respectively, on the long-
term note.    

Solitario Exploration & Royalty Corp. | 33

Notes | to Consolidated Financial Statements continued

RMB Facility Agreement
On August 10, 2012, Solitario entered into a Facility Agreement
with RMBAH and RMBR.  Under the Facility Agreement, Soli-
tario  may  borrow  up  to  $5,000,000  from  RMBAH  (with  any
amounts outstanding collectively being the “RMB Loan”) at any
time  during  the  24-month  period  commencing  on  August  21,
2012, the date of initial funding (the “Availability Period”), after
which time any undrawn portion of the $5,000,000 commitment
will be cancelled and will no longer be available for drawdown.
Solitario borrowed $1,500,000 on August 21, 2012 from which it
received net proceeds of $912,000 after deducting deferred offer-
ing  costs  of  $588,000,  which  included  an  arrangement  fee  of
$250,000, legal costs of $328,000 and other costs of $10,000.
The deferred offering costs are recorded in other long-term assets
and are being amortized on a straight-line basis to interest ex-
pense over 36 months, the term of the Facility Agreement.  Soli-
tario  has  recorded  deferred  offering  costs  of  $518,000  as  of
December 31, 2012 in other long-term assets.  The proceeds from
the initial funding were used to pay the balance due on the facil-
ity arrangement fee of $175,000, to pay certain legal expenses re-
lated  to  the  Facility  Agreement,  and  to  reduce  outstanding
short-term margin loans.      

The Facility Agreement was subject to a $250,000 arrangement
fee, of which $75,000 had been paid prior to initial funding.  The
RMB Loan matures on the earlier to occur of (i) 36 months from the
date of initial funding or (ii) the date on which financing is made
available to MH-LLC for purposes of placing the Mt. Hamilton
project into commercial production.  The RMB Loan amounts bear
interest at the 90-day LIBOR rate plus 5%, payable in arrears on
the last day of each quarterly interest period.  The RMB Loan in-
terest rate was 5.36% at December 31, 2012.  All proceeds from
the RMB Loan are to be deposited in a proceeds account (the “Pro-
ceeds Account”) and are recorded as restricted cash until dis-
bursed in accordance with the Facility Agreement.  Pursuant to
the Facility Agreement, funds may only be disbursed from the Pro-
ceeds Account for approved expenditures, including (i) exploration
and development activities at the Mt. Hamilton project, ongoing
earn-in payments at MH-LLC, general corporate purposes as set
forth in a project and corporate budget approved by RMBAH and
(ii) any other purpose approved by RMBAH. As of December 31,
2012, there was no cash balance in the Proceeds Account.  The
RMB  Loan  may  be  repaid  at  any  time  without  penalty.    Any
amounts repaid may not be redrawn under the Facility Agreement.
The RMB Loan is secured by a lien on Solitario’s 80% interest in
MH-LLC as well as a general security interest in Solitario’s re-
maining assets. 

As of December 31, 2012, the outstanding balance under the RMB
Loan was $1,500,000.  Solitario borrowed an additional $1,000,000
during February 2013 pursuant to the RMB Facility Agreement
and at February 28, 2013, the balance due on the RMB Loan is
$2,500,000.  During 2012 Solitario recorded the following interest
expense related to the RMB Loan:

34 | 2012 Annual Report

(in thousands)                    Year ended December 31,

Interest expense paid in cash
Amortization of the RMB 

Warrants discount

Amortization of RMB deferred 

financing costs

Total interest expense related 

to the RMB Loan

2012
30 

$ 

77 

70 

$

177 

RMB Warrants
Pursuant to the Facility Agreement, the Company issued 1,624,748
warrants to RMBAH as partial consideration for financing services
provided in connection with the Facility Agreement. Each RMB
Warrant entitles the holder to purchase one of Solitario common
stock pursuant to the terms and conditions of the RMB Warrants.
The RMB Warrants expire 36 months from their date of issuance
and have an exercise price of $1.5387 per Warrant Share, subject
to customary anti-dilution adjustments.  Solitario recorded a dis-
count to the RMB Loan for the fair value of the RMB Warrants of
$650,000  as  of  August  21,  2012,  based  upon  a  Black-Scholes
model using a 36-month life, volatility of 62%, and a risk-free in-
terest rate of 0.39%.  Solitario is amortizing this discount on a
straight-line basis to interest expense over the three-year term of
the RMB Loan and as of December 31, 2012, the remaining un-
amortized warrant discount was $573,000.   

5. Income Taxes:
Solitario’s income tax expense (benefit) consists of the following as
allocated between foreign and United States components:

(in thousands)                      
Current:

2012

2011

United States
Foreign
Deferred:

United States
Foreign

Operating loss and credit carryovers:

United States
Foreign

Income tax expense (benefit)  

$

$

$      

-
18

$      

(853) $
-  

-  
14

407
-  

187
-  
(648) $

(1,056)
-  
(635)

Consolidated income (loss) before income taxes includes losses
from foreign operations of $1,944,000 and $2,657,000 in 2012 and
2011, respectively.  

See Note 1, “Business and Summary of Significant Accounting Poli-
cies” for a detail of the deferred taxes associated with the sale of
marketable equity securities and the deferred taxes associated with
unrealized gains and losses associated with other comprehensive
income related to marketable equity securities.  

The net deferred tax assets/liabilities in the December 31, 2012
and  2011  consolidated  balance  sheets  include  the  following 
components:

Notes | to Consolidated Financial Statements continued

2012

2011

ious periods from five years to no expiration depending on the for-
eign jurisdiction.  

(in thousands)                      
Deferred tax assets:
Loss carryovers
Deferred gain
Stock option compensation expense
Royalty
Earnings in unconsolidated 

subsidiary

Severance
Unrealized loss on derivative 

securities

Other 
Valuation allowance
Total deferred tax assets
Deferred tax liabilities:

Unrealized gain on derivative 

securities

MH-LLC investment
Exploration costs
Unrealized gains on marketable 
equity securities
Other

Total deferred tax liabilities

$

$ 10,118
1,253
900
1,492

496
30

79
106
(10,328)
4,146

9,887
-  
648
1,492

314
30

-  
67
(9,699)
2,739

-  
1,932
845

2,328
4
5,109
963

$

107
1,083
845

3,496
5
5,536
2,797

Net deferred tax liabilities

$

At December 31, 2012 and 2011, Solitario has classified $963,000
and $1,627,000, respectively, of its deferred tax liability as current,
primarily related to the current portion of its investment in Kinross
common stock.  

A reconciliation of expected federal income taxes on income (loss)
from operations at statutory rates, with the expense (benefit) for in-
come taxes is as follows:

(in thousands)                      
Expected income tax 
expense (benefit)
Non-deductible foreign 

expenses

Non-deductible foreign 

stock compensation expense

Foreign tax rate differences
State income tax
Change in valuation allowance
MH-LLC investment
Permanent differences and other 
Income tax expense (benefit)

2012

2011

$

(1,444) $

(2,585)

1

20
72
(82)
629
102
54

$

(648) $

1

16
90
(56)
621
1,221
57
(635)

During 2012 and 2011 the valuation allowance was increased pri-
marily as a result of increases in Solitario’s foreign net operating
loss carryforwards, for which it was more likely than not that the
deferred tax benefit would not be realized.  

At December 31, 2012, Solitario has unused US federal Net Oper-
ating Loss (“NOL”) carryovers of $2,502,000 and unused US State
NOL carryovers of $3,409,000 both of which begin expiring in
2030.  Solitario has foreign loss carryforwards for which Solitario
has provided a full valuation allowance and which expire over var-

Solitario adopted the provisions of ASC 740, which prescribe a
recognition threshold and measurement attribute for the financial
statement recognition and measurement of a tax position taken or
expected to be taken in a tax return. ASC 740 requires that Solitario
recognize in its consolidated financial statements, only those tax
positions that are “more-likely-than-not” of being sustained as of
the adoption date, based on the technical merits of the position. As
a result of the implementation of ASC 740, Solitario performed a
comprehensive review of its material tax positions in accordance
with recognition and measurement standards established by ASC
740.  The provisions of ASC 740 had no effect on Solitario’s finan-
cial position, cash flows or results of operations at December 31,
2012 or December 31, 2011, or for the years then ended as Solitario
had no unrecognized tax benefits.   

Solitario and its subsidiaries are subject to the following material
taxing jurisdictions: United States Federal, States of Colorado and
Nevada, Mexico, Peru and Brazil.  The tax years that remain open
to examination by the United States Internal Revenue Service are
years 2009 through 2012. The tax years that remain open to exam-
ination by the State of Colorado are years 2008 through 2012. The
tax years that remain open to examination by Mexico are years 2009
through 2012.  All tax years remain open to examination in Peru
and Brazil.  Solitario’s policy is to recognize interest and penalties
related to uncertain tax benefits in income tax expense. Solitario
has no accrued interest or penalties related to uncertain tax posi-
tions as of December 31, 2011 or December 31, 2012, or for the
years then ended. 

6. Derivative Instruments:
RMB Warrants          
Because the Facility Agreement requires Solitario to be current in
its filings with the United States Securities and Exchange Commis-
sion, Solitario has determined the warrants could be cash settled in
accordance with ASC 815-40, “Derivatives and Hedging, Contracts
in Entity’s Own Equity.”  Accordingly Solitario has classified its
RMB Warrants as a liability and adjusts the fair value of the war-
rants at each balance sheet date, with changes in value recorded in
other income/expense in the statement of operations.  Solitario
recorded a loss on the RMB Warrants of $488,000 during 2012,
based upon a Black-Scholes model using a 35-month life, a volatil-
ity of 62%, a stock price of $1.68 per share and a risk free interest
rate of 0.35%.

Covered Call Options
Beginning in December 2008, Solitario sold covered calls cover-
ing its shares of Kinross common stock.  In September 2012, Soli-
tario sold options covering 100,000 shares for proceeds of $68,000.
In November 2012 Solitario repurchased options for 50,000 shares
for  $17,000,  and  recorded  a  gain  on  derivative  instruments  of
$23,000.  As of December 31, 2012, the remaining options for
50,000 shares were recorded in other current assets at their fair
value of $3,000 and Solitario had recorded a gain on derivative in-
struments of $25,000.  In September 2011, Solitario sold options

Solitario Exploration & Royalty Corp. | 35

Notes | to Consolidated Financial Statements continued

covering 65,000 shares for proceeds of $57,000, which were repur-
chased in October 2011 for $15,000 and Solitario recorded a gain
of $42,000 in gain/loss on derivative earnings.   Solitario has not
designated its covered calls as hedging instruments as described
in ASC 815 and any changes in the fair market value of its covered
calls are recognized in the statement of operations in the period of
the change.  Solitario does not use its covered call derivative in-
struments as trading instruments; any cash received or paid related
to its derivative instruments is shown as investing activities in the
consolidated statement of cash flows.

Ely Warrants
During 2010, in connection with the acquisition of Mt. Hamilton
and the formation of MH-LLC, Solitario made a series of equity in-
vestments in Ely.  Solitario acquired 3,333,333 shares of Ely and
warrants to purchase 1,666,666 shares of Ely stock for Cdn$0.25
per share, with warrants for 833,333 shares that expired on Au-
gust 30, 2012 and warrants for 833,333 shares that expired on Oc-
tober 19, 2012.  Solitario has recorded gains and losses on the Ely
warrants in its gain (loss) on derivative instruments in the statement
of operations as detailed below.  Solitario has no remaining value
for its investment in the Ely warrants in the consolidated balance
sheet at December 31, 2012.  Solitario’s fair value for its invest-
ment in the Ely warrants at December 31, 2011, based upon a
Black-Scholes option pricing model, was recorded as a current
asset as detailed below.  

Kinross Collar
On October 12, 2007, Solitario entered into a Zero-Premium Equity
Collar (the “Kinross Collar”) pursuant to a Master Agreement for
Equity Collars and a Pledge and Security Agreement with UBS AG,
London, England, an Affiliate of UBS Securities LLC (collectively
“UBS”).  Under the terms of the Kinross Collar, Solitario pledged
900,000 shares of Kinross common shares to be sold (or delivered
back to Solitario with any differences settled in cash).  On April 12,
2011, the remaining 100,000 shares under the Kinross Collar were
released upon the expiration of the tranche of the Kinross Collar on
that date.  No shares were delivered to UBS under the Kinross Col-
lar and no cash was paid or received upon termination of the final
tranche of the Kinross Collar.  Solitario had not designated the Kin-
ross Collar as a hedging instrument as described in ASC 815, “De-
rivatives and Hedging,” and any changes in the fair market value
of the Kinross Collar are recognized in the statement of operations
in the period of the change.  

International Lithium Corp.
In May 2011 TNR Gold Corp. (“TNR”) completed a spin-out of a new
entity, International Lithium Corp. (“ILC”).  Solitario owned 1,000,000
shares of TNR at the time of the spin-out and received 250,000 shares
of ILC and warrants to acquire 250,000 shares of ILC (the “ILC War-
rants”) at a price of Cdn$0.375 per share for a period of two years.
Solitario has written-down its investment in the ILC Warrants and has
no value recorded for the ILC warrants as of December 31, 2012.  

The following table provides the location and amount of the fair val-
ues of Solitario’s derivative instruments presented in the consoli-
dated balance sheet as of December 31, 2012 and 2011:

(in thousands)                    Derivatives

Balance Sheet 
Location  

December 31,
2012

2011

Derivatives not 
designated as 
hedging instruments 
under ASC 815
RMB warrants
Ely investment 

Long-term liabilities $ 1,138

$    

-   

warrants
ILC warrants

Current other assets
Current other assets

- 
- 

74
4

The following amounts are included in loss on derivative instru-
ments in the consolidated statement of operations for the years
ended December 31, 2012 and 2011: 

(in thousands)                       Year ended December 31,

2012

2011

Loss on derivatives not 
designated as hedging 
instruments under ASC 815 

Ely warrants
ILC warrants
Kinross Collar
Kinross Calls
Total loss

$

$

(74) $ 
(4)
-   

48
(30) $

(179)
2
(2)
42
(137)

The Kinross common stock held as collateral for the margin loans
at UBS Bank and RBC are held in Solitario’s brokerage accounts at
UBS and RBC, respectively.  See Note 3, “Short-term debt” above.  

7. Fair Value of Financial Instruments:
For certain of Solitario’s financial instruments, including cash and
cash equivalents, the Sandstorm royalty sale receivable, payables
and short-term debt, the carrying amounts approximate fair value
due to their short maturities. Solitario’s marketable equity securities,
including its investment in Kinross common stock, TNR Gold and
Ely equity investments are carried at their estimated fair value pri-
marily based on publicly available quoted market prices.      

Solitario applies ASC 820, “Fair Value Measurements.” ASC 820 es-
tablishes a framework for measuring fair value and requires enhanced
disclosures about fair value measurements. ASC 820 clarifies that
fair value is an exit price, representing the amount that would be re-
ceived to sell an asset or paid to transfer a liability in an orderly trans-
action between market participants. ASC 820 also requires disclosure
about how fair value is determined for assets and liabilities and es-
tablishes a hierarchy for which these assets and liabilities must be
grouped, based on significant levels of inputs as follows: 

Level 1: Quoted prices in active markets for identical as-
sets or liabilities;
Level 2: Quoted prices in active markets for similar assets
and liabilities and inputs that are observable for the asset or
liability; or
Level 3: Unobservable inputs in which there is little or no
market data, which require the reporting entity to develop its
own assumptions.

36 | 2012 Annual Report

Notes | to Consolidated Financial Statements continued

The determination of where assets and liabilities fall within this hi-

erarchy is based upon the lowest level of input that is significant to

December 31, 2012 and 2011, there were no other reclassifications
in financial assets or liabilities between Level 1, 2 or 3 categories.  

the fair value measurement.  During 2011 Solitario reclassified a por-

tion of its investment in Ely shares from Level 2 to Level 1 upon the

expiration of statutory holding requirements.  During the years ended

The following is a listing of Solitario’s financial assets and liabilities
required to be measured at fair value on a recurring basis and where
they are classified within the hierarchy as of December 31, 2012: 

(in thousands)
Assets 

Level 1

Level 2

Level 3

Total  

Marketable equity securities 

$

7,093 

$      -   

$

Liabilities 

RMB warrants

-   

1,138 

-   

-   

$

7,093 

1,138 

The following is a listing of Solitario’s financial assets and liabilities required to be measured at fair value on a recurring basis and
where they are classified within the hierarchy as of December 31, 2011: 

(in thousands)
Assets 

Marketable equity securities 
Other current assets - Ely warrants
Other current assets - ILC warrants

Items Measured at Fair Value on a Recurring Basis: 
Marketable equity securities: At December 31, 2012 and 2011,
the fair value of Solitario’s investment in Kinross, TNR and Ely
marketable equity securities is based upon quoted market prices.  

RMB warrants:  The RMB warrants issued by Solitario are not
traded on any public exchange.  Solitario determines the fair value
of the RMB warrants using a Black-Scholes pricing model, using in-
puts, including share price, volatility of Solitario common stock and
discount rates that include an assessment of performance risk, that
are readily available from public markets therefore they are classi-
fied as Level 2 inputs as of December 31, 2012.  

Ely and ILC warrants: The Ely and ILC warrants are not traded
on any public exchange.  Solitario determines the fair value of the
Ely and ILC warrants using a Black-Scholes pricing model, using
inputs, including share price, volatility of Ely common stock and
discount rates that include an assessment of performance risk, that
are readily available from public markets and therefore they are
classified as Level 2 inputs as of December 31, 2011.  

Items Measured at Fair Value on a Nonrecurring Basis: 
RMB long-term debt: In 2012 the long-term debt associated with
the RMB Facility Agreement was discounted for the fair value of the
RMB warrants, discussed above.  The RMB warrants are not traded
on any public exchange.  Solitario determined the fair value of the
RMB warrants, associated with the discount to the RMB Loan,
using a Black-Scholes pricing model, using inputs, including share
price, volatility of Solitario common stock and discount rates that in-
clude an assessment of performance risk, that are readily available
from public markets and therefore they were classified as Level 2
inputs.  See Note 4, “Long-term debt.”  

During the year ended December 31, 2012, Solitario did not change
any of the valuation techniques used to measure its financial as-
sets and liabilities at fair value.

Level 1  

Level 2  

Level 3

Total

$

$

$

-
-
-

10,361
-
-

$ 10,361
74
4

-
74
4
8. Commitments and Contingencies:
In acquiring its interests in mineral claims and leases, Solitario has
entered into lease agreements, which may be canceled at its option
without penalty.  Solitario is required to make minimum rental and
option payments in order to maintain its interests in certain claims
and leases.  See Note 2, “Mineral properties,” above.  Solitario es-
timates its 2013 property rentals and option payments, excluding
the Augusta long-term debt, discussed above and certain earn-in
payments to DHI-US discussed below, for properties we own or op-
erate to be approximately $805,000, assuming that our joint ven-
tures continue in their current status and that we do not appreciably
change our property positions on existing properties; approximately
$777,000 of these annual payments are paid or are reimbursable to
us by our joint venture partners.  In addition, we may be required
to make further payments in the future if we elect to exercise our op-
tions under those agreements or if we enter into new agreements.  

Solitario has entered into certain month-to-month office leases for
its field offices in Nevada, Peru and Mexico.  The total rent expense
for these offices during 2012 and 2011 was approximately $61,000
and $55,000, respectively.  In addition, Solitario leases office space
under a non-cancelable operating lease for the Wheat Ridge, Col-
orado  office  which  provides  for  total  minimum  rent  payments
through October of 2015 of $73,000. 

As  a  result  of  completion  of  the  Mt.  Hamilton  Feasibility  Study, 
Solitario is committed to make certain earn-in payments to DHI-US,
excluding payments for the Augusta debt, discussed above in Note 4,
“Long-term debt,” as contemplated in the MH Agreement: (1) annual
cash payments of $300,000 for an advance minimum royalty due to an
underlying royalty holder; (2) payment to DHI-US of $500,000 in cash
and delivery of 100,000 shares of Solitario common stock by August
23, 2013; (3) payment of $500,000 in cash; delivery of 100,000 shares
of Solitario common stock by August 23, 2014; and (4) buy down a por-
tion of an existing 6% net smelter royalty to a 1% net smelter royalty
by paying $5,000,000 to an underlying royalty holder on or before
commercial completion of the Mt. Hamilton project. 

Solitario Exploration & Royalty Corp. | 37

Notes | to Consolidated Financial Statements continued

9. Employee Stock Compensation Plans: 
a.) The 2006 Plan
On June 27, 2006, Solitario’s shareholders approved the 2006 Stock
Option Incentive Plan (the “2006 Plan”).  Under the terms of the
2006 Plan, the Board of Directors may grant up to 2,800,000 op-
tions to Directors, officers and employees with exercise prices equal
to the market price of Solitario’s common stock at the date of grant.  

Solitario accounts for its stock options under the provisions of ASC
718, “Compensation – Stock Compensation.”  Pursuant to ASC 718,
as of January 1, 2011, Solitario classifies its stock options as equity
options in accordance with ASU 2010-13.  Previously, Solitario had
classified its stock options as liabilities as they are priced in Cana-
dian dollars and Solitario’s functional currency is United States dol-
lars and Solitario’s common stock trades on both the NYSE MKT and
the Toronto Stock Exchange (“TSX”).  Prior to January 1, 2011, Soli-
tario recorded a liability for the fair value of the vested portion of out-
standing options based upon a Black-Scholes option pricing model.  

During the year ended December 31, 2011, options for 150,600
shares were exercised at prices between Cdn$1.55 and Cdn$2.40
per share for cash proceeds of $247,000.  During 2012 there were
no shares exercised from the 2006 Plan.  There were no options for-
feited during 2012 or 2011.

b.) Stock Option Compensation

Solitario’s outstanding options on the date of grant have a five-year
term, and vest 25% on date of grant and 25% on each of the next
three anniversary dates.  Solitario recognizes stock option compen-
sation expense on the date of grant for 25% of the grant date fair
value, and subsequently, based upon a straight line amortization of
the unvested grant date fair value of each of its outstanding options.
The following table shows the grant date fair value of Solitario’s op-
tions grants as of the date of grant.  

Grant date fair value
Grant Date
Option – grant date price (Cdn$)
Options outstanding 
Expected life years
Expected volatility 
Risk free interest rate
Weighted average fair value 
Grant date fair value

12/16/12
1.49
$
165,000
5.0
68%
0.7%
0.84
$
$ 139,000

5/5/10

$

2.40
2,065,000
5.0
56%
2.2%
1.19
$
$2,449,000

5/19/09  
1.55
$
519,000
5.0
56%
1.9%
0.65
$
$ 339,000

Solitario recorded $732,000 and $697,000, respectively, of stock option expense during 2012 and 2011 included in general and admin-
istrative expense, for the amortization of grant date fair value with a credit to additional paid-in capital.

c.) Stock Option Activity
The following table summarizes the activity for stock options outstanding under the 2006 Plan as of December 31, 2012, with exercise
prices equal to the stock price, as defined, on the date of grant and no restrictions on exercisability after vesting:

The activity in the 2006 Plan for the years ended December 31, 2012 and 2011 is as follows:

2006 Plan
Outstanding, beginning of year
Granted
Exercised
Cancelled
Forfeited
Outstanding, end of year
Exercisable, end of year

2012
Weighted
Average
Exercise
Price (Cdn$)

Aggregate
Intrinsic
Value (1)

$  2.27
$  1.49
-  
-  
-  
$  2.22
$  2.22

$  1,650
$     413

Options

2,433,400
165,000
-  
-  
-  
2,598,400
1,958,400

Options

2,584,000
-  
(150,600)
-  
-  
2,433,400
1,271,150

2011
Weighted
Average
Exercise
Price (Cdn$)

Aggregate
Intrinsic
Value (1)

$  2.23
-
$  1.60
-  
-  
$  2.27
$  2.24

$         -  
$         -  

(1) The intrinsic value at December 31, 2012 and 2011 based upon the quoted market price of Cdn$1.50 and Cdn$1.36, respectively,
per share for our common stock on the TSX and an exchange ratio of 1.0312 and 0.9804, respectively, Canadian dollars per United
States dollar.

38 | 2012 Annual Report

Notes | to Consolidated Financial Statements continued

10.  Ely Gold Investment and the Mt. Hamilton 

Joint Venture:

On August 26, 2010, Solitario signed a letter of intent (the “LOI”)
with Ely to make certain equity investments into Ely and to joint
venture Ely’s Mt. Hamilton gold project through the formation of
MH-LLC.  The formation of MH-LLC and certain property invest-
ments are described above in Note 2, “Mineral property.”  The
terms of the joint venture are set forth in the MH Agreement of MH-
LLC between us and DHI-US.  

Initial Investment in Ely
During 2010, in connection with the acquisition of Mt. Hamilton
and the formation of MH-LLC, Solitario paid $500,000 in cash for
a series of equity investments in Ely.  Solitario acquired 3,333,333
shares of Ely (the “Ely Shares”) and warrants to purchase 1,666,666
shares  of  Ely  stock  for  Cdn$0.25  per  share,  with  warrants  for
833,333 shares that expired on August 30, 2012 and warrants for
833,333 shares that expired on October 19, 2012.  Solitario allo-
cated its investment in Ely based upon the fair values of the assets
purchased using quoted market prices for the Ely Shares and a
Black-Scholes option pricing model for the Ely warrants.  As of 
December 31, 2012 and 2011, the Ely Shares are recorded at their
fair value based upon quoted prices of $532,000 and $588,000, re-
spectively, with an unrealized gain included in other comprehensive
income of $174,000 and $231,000, respectively, net of deferred
taxes of $65,000 and $86,000, respectively. 

Additional Tranches of Ely Common Stock for Payment of
MH-LLC Long-term Debt
The LOI, as amended, provides that Solitario subscribe for three
additional tranches of shares of Ely:  (i) $750,000 in shares of Ely
common stock on May 1, 2013 at a price equal to the greater of (a)
the  20-day  weighted  moving  average  price  on  the  TSXV  (the
“WMAP”) immediately preceding May 1, 2013 and (b) the price of
Ely’s shares on the TSXV on the day before May 1, 2013 (the “Third
Tranche”), the entire amount of which Ely is required to utilize to
make the $750,000 payment due to Augusta for the long-term debt
in Note 4 above; (ii) $750,000 in shares of Ely common stock on or
before May 1, 2014 at a price equal to the greater of (a) the WMAP
immediately preceding the date that Solitario subscribes for such
shares and (b) the price of Ely’s shares on the TSXV on the trading

day immediately preceding the date that Solitario subscribes for
such shares (the “Fourth Tranche”), the entire amount of which Ely
is required to utilize to make the $750,000 payment due to Augusta
for the long-term debt in Note 4 above; and (iii) $1,000,000 in
shares of Ely common stock on or before May 1, 2015 at a price
equal to the greater of (a) the WMAP immediately preceding the
date that Solitario subscribes for such shares and (b) the price of
Ely’s shares on the TSXV on the trading day immediately preced-
ing the date that Solitario subscribes for such shares (the “Fifth
Tranche”), the entire amount of which Ely is required to utilize to
make the $1,000,000 payment due to Augusta for the long-term
debt in Note 4 above. Although the MH Agreement provides that
Solitario would have no obligation to subscribe for any of the shares
if Solitario chooses to cease earning an additional interest in MH-
LLC, discussed below, prior to the subscription for the shares, as a
result of the completion of the Feasibility Study, Solitario intends to
develop the Mt. Hamilton project and would be subject to dilution
to a 49% interest in MH-LLC if it does not complete all of the pay-
ments to DHI-US and the subscription of Ely required in the LOI.  

11. Related Party Transactions:
On June 26, 2012, Christopher Herald, President and Chief Exec-
utive Officer of Solitario, and James Maronick, Chief Financial Of-
ficer of Solitario, purchased shares of the Company’s common stock
at a price of $1.22 per share, with Mr. Herald purchasing 180,000
shares and Mr. Maronick purchasing 45,000 shares. The purchase
of the shares was unanimously approved by Solitario’s Board of Di-
rectors and was also unanimously approved by Solitario’s Audit
Committee of the Board of Directors.  The price of the shares was
the last closing price of Solitario’s common shares as quoted on the
NYSE MKT (formerly NYSE Amex) on June 25, 2012.  Solitario re-
ceived total proceeds of $275,000.  

12. Segment Reporting:
With the completion of the Feasibility Study on February 22, 2012,
Solitario now operates in two segments, (i) mineral exploration and
(ii) mining development and operations.  Solitario is capitalizing
Mt. Hamilton development and operations costs subsequent to Feb-
ruary 22, 2012, as detailed above in Note 2, “Mineral properties.”
The following summarizes Solitario segment information for the year
ended December 31, 2012:

(in thousands)

Exploration expense
Interest expense
Other (1)
Pre-tax loss
Total assets (2)(3)
Capital expenditures

$ 

Year ended December 31, 2012
Corporate     
and Other     Consolidated 
1,986 
$   
418 
1,842 
4,246 
23,483 
3,854 

Mt. Hamilton Exploration
1,685 
-  
798 
2,483 
1,467 
3 

301 
184 
58 
543 
14,236 
3,789 

-   
234 
986 
1,220 
7,780 
62 

$
$
$       

$
$
$     

$     
$
$

$ 
$
$ 

$ 

$

(1) Corporate and other includes gain on sale of marketable equity securities of $1,528.
(2) Exploration total assets include equity method investment of $1,165.
(3) Corporate and other total assets include investment in marketable equity securities of $7,093.

Solitario Exploration & Royalty Corp. | 39

Notes | to Consolidated Financial Statements continued

13. Subsequent Event:

In March 2013 Solitario signed a binding Letter of Intent (“LOI”)
related to its Pachuca project in Mexico with Minera Hochschild
Mexico S.A. de C.V. (“Hochschild”), a wholly owned subsidiary of
Hochschild Mining plc.  The LOI provides for Hochschild to earn
a 51% interest in the Pachuca project by funding the following ex-
ploration commitments from the signing of a definitive agreement:

Due Dates

18 months 
36 months 
60 months 
Total

Expenditures (US$)

$ 2,000,000
$ 3,000,000
$ 5,000,000
$10,000,000

Hochschild will have the option to earn an additional 19% (total
interest 70%) in the project by funding all project expenditures nec-
essary to complete a positive feasibility study.  Hochschild will man-
age the operations and has the right to terminate the joint venture
at any time.  Currently, we are working on negotiating a definitive
joint venture agreement with Hochschild.  There can be no assur-
ance that such an agreement will ultimately be signed.  

40 | 2012 Annual Report

Corporate Information - Officers & Directors

Corporate Offices

4251 Kipling Street, Suite 390

Wheat Ridge, Colorado 80033

Telephone: 303-534-1030

Fax: 303-534-1809

www.solitarioXRcom

Legal Counsel

Polsinelli Shugart PC

Denver, Colorado

Fogler, Rubinoff LLP

Toronto, Ontario

Auditors

EKS&H, LLLP 

Denver, Colorado

Transfer Agent

Computershare Investor Services

100 University Avenue

Toronto, Ontario M5J2Y1 Canada

800-564-6253

Notice of Annual Meeting of Shareholders

The Annual Meeting will be at 10 a.m. MDT on

Tuesday, June 18, 2013 at the Company’s 

corporate offices.

Stock Exchange Listings

NYSE MKT: XPL  |  TSX: SLR

The Company’s common stock has been listed and

traded in Canada on the Toronto Stock Exchange since

July 19, 1994 under the symbol SLR and on the NYSE

MKT (formerly the NYSE Amex) since August 11,

2006 under the symbol XPL.

Investor Relations

Questions and requests for information should be

directed to Debbie Mino-Austin, Director-Investor

Relations at 800-229-6827, or via email at

dwmino@slrxpl.com

Officers 

Christopher E. Herald | President & CEO

James R. Maronick | Chief Financial Officer

Walter H. Hunt | Chief Operating Officer

Directors 

Brian Labadie | Chairman of the Board

Mark E. Jones, III | Vice Chairman of the Board 

John Hainey | Director

Leonard Harris | Director

Christopher E. Herald | Director 

This publication includes certain “Forward-Looking Statements”
within the meaning of section 21E of the United States Securities
Exchange Act of 1934, as amended. All statements, other than
statements of historical fact, included herein, including without
limitation, statements regarding potential mineralization and
reserves, exploration results and future plans and objectives of
Solitario, are forward-looking statements that involve various risks
and uncertainties. There can be no assurance that such statements
will prove to be accurate and actual results and future events could
differ materially from those anticipated in such statements.
Development of Solitario’s properties is subject to the success of
exploration, completion and implementation of an economically
viable mining plan, obtaining the necessary permits and approvals
from various regulatory authorities, compliance with operating
parameters established by such authorities and political risks such
as higher tax and royalty rates, foreign ownership controls and our
ability to finance in countries that may become politically unstable.
Important factors that could cause actual results to differ materially
from Solitario’s expectations are disclosed under the heading “Risk
Factors” and elsewhere in Solitario’s documents filed from time to
time with the United States Securities and Exchange Commission,
the Canadian Securities Commissions and other regulatory
authorities. Cautionary Note to U.S. Investors concerning
estimates of Resources: This annual report uses the terms
“Measured, Indicated and Inferred Resources.” The
Company advises U.S. investors that while these terms are
recognized and required by Canadian regulations, the SEC
does not recognize the terms.  U.S. and Canadian investors
are further cautioned not to assume that all of Measured or
Indicated Mineral Resources will ever be converted into
Reserves.  Inferred Resources have a great amount of
uncertainty as to their existence, and great uncertainty as
to their economic and legal feasibility. It cannot be assumed
that all or any part of an Inferred Mineral Resource will
ever be upgraded to a higher category. Under Canadian
rules, estimates of Inferred Mineral Resources may not
form the basis of feasibility or pre-feasibility studies, except
in rare cases. U.S. investors are cautioned not to assume
that any part or all of a measured, indicated or inferred
resource exists, or is economically or legally minable. We
advise U.S. investors that the SEC's mining guidelines strictly
prohibit information of this type in documents filed with the SEC.
U.S. investors are cautioned that mineral deposits on adjacent
properties are not indicative of mineral deposits on our properties.    

Photography: Walter H. Hunt
Design: www.PiteCreative.com

Solitario Exploration & Royalty Corp. | 41

SOLITARIO
E X P L O R AT I O N
& R O YA LT Y

4251 Kipling Street, Suite 390

Wheat Ridge, Colorado 80033

Tel: 303.534.1030

Fax: 303.534.1809

SolitarioXR.com

NYSE MKT:  XPL
TSX:  SLR