FY2016 Annual Report · Trilogy Metals Inc.
Sign in to download
Loading PDF…
UNITED STATES 
SECURITIES AND EXCHANGE COMMISSION 
Washington, D.C. 20549 

FORM 10-K 

(cid:1) 

(cid:2) 

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 

For the Fiscal Year Ended November 30, 2016 

OR 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 

For the Transition Period from            to 

Commission File Number: 1-35447 

TRILOGY METALS INC. 

(Exact Name of Registrant as Specified in Its Charter) 

British Columbia 
(State or Other Jurisdiction of 
Incorporation or Organization) 

Suite 1950, 777 Dunsmuir Street  
Vancouver, British Columbia  
Canada 
(Address of Principal Executive Offices) 

98-1006991 
(I.R.S. Employer 
Identification No.) 

V7Y 1K4 
(Zip Code) 

(604) 638-8088  
(Registrant’s Telephone Number, Including Area Code) 

Securities registered pursuant to Section 12(b) of the Act: 

Title of Each Class 
Common Shares, no par value 

Name of Each Exchange on Which Registered 
NYSE MKT 

Securities registered pursuant to Section 12(g) of the Act: None 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes (cid:2) No (cid:1) 

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes (cid:2) No (cid:1) 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities 
Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and 
(2) has been subject to such filing requirements for the past 90 days. Yes (cid:1) No (cid:2) 

Indicate  by  check  mark  whether  the  registrant  has  submitted  electronically  and  posted  on  its  corporate  Web  site,  if  any,  every 
Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for 
such shorter period that the registrant was required to submit and post such files). Yes (cid:1) No (cid:2) 

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not 
be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of 
this Form 10-K or any amendment to this Form 10-K. (cid:2) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Indicate by check  mark  whether the registrant is a large accelerated filer, an accelerated filer, a  non-accelerated  filer, or a smaller 
reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of 
the Exchange Act. (Check one): 

Large accelerated filer (cid:2) 

Accelerated filer (cid:2) 

Non-accelerated filer (cid:2) 
(Do not check if a smaller reporting 
company) 

Smaller reporting company(cid:1) 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes (cid:2) No (cid:1) 

As  at  May  31,  2016,  the  aggregate  market  value  of  the  registrant’s  Common  Shares  held  by  non-affiliates  was  approximately 
$30.1 million. As of February 2, 2017, the registrant had 105,501,761 Common Shares, no par value, outstanding.  

DOCUMENTS INCORPORATED BY REFERENCE 

Certain portions of the registrant's definitive proxy statement to be filed with the Securities and Exchange Commission pursuant to 
Regulation 14A not later than March 30, 2017, in connection with the registrant’s 2017 annual meeting of stockholders, are incorporated 
herein by reference into Part III of this Annual Report on Form 10-K. 

2 

 
TRILOGY METALS INC. 

TABLE OF CONTENTS 

Page 

CURRENCY ............................................................................................................................................................................................ 2 

FORWARD-LOOKING STATEMENTS ................................................................................................................................................ 2 

CAUTIONARY NOTE TO UNITED STATES INVESTORS ................................................................................................................ 4 

CAUTIONARY  NOTE  TO  ALL  INVESTORS  CONCERNING  ECONOMIC  ASSESSMENTS  THAT  INCLUDE  INFERRED 
RESOURCES ........................................................................................................................................................................................... 4 

GLOSSARY OF TECHNICAL ................................................................................................................................................................ 7 

PART I .................................................................................................................................................................................................... 12 

Item 1.  BUSINESS ................................................................................................................................................................. 12 
Item 1A.  RISK FACTORS ........................................................................................................................................................ 18 
Item 1B.  UNRESOLVED STAFF COMMENTS ..................................................................................................................... 30 
Item 2.  PROPERTIES ............................................................................................................................................................ 30 
Item 3.  LEGAL PROCEEDINGS .......................................................................................................................................... 57 
Item 4.  MINE SAFETY DISCLOSURES .............................................................................................................................. 57 

PART II .................................................................................................................................................................................................. 58 

Item 5.  MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER 
PURCHASES OF EQUITY SECURITIES ............................................................................................................................... 58 
Item 6.  SELECTED FINANCIAL DATA ............................................................................................................................. 68 
Item 7.  MANAGEMENT’S  DISCUSSION  AND  ANALYSIS  OF  FINANCIAL  CONDITION  AND  RESULTS  OF 
OPERATIONS........................................................................................................................................................................... 69 
Item 8.  FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA ........................................................................... 81 
Item 9.  CHANGES  IN  AND  DISAGREEMENTS  WITH  ACCOUNTANTS  ON  ACCOUNTING  AND  FINANCIAL 
DISCLOSURE ......................................................................................................................................................................... 101 
Item 9A.  CONTROLS AND PROCEDURES ........................................................................................................................ 101 
Item 9B.  OTHER INFORMATION........................................................................................................................................ 101 

PART III ............................................................................................................................................................................................... 102 

Item 10.  DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE ................................................. 102 
Item 11.  EXECUTIVE COMPENSATION ........................................................................................................................... 102 
Item 12.  SECURITY  OWNERSHIP  OF  CERTAIN  BENEFICIAL  OWNERS  AND  MANAGEMENT  AND  RELATED 
STOCKHOLDER MATTERS ................................................................................................................................................. 102 
Item 13.  CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE ...... 102 
Item 14.  PRINCIPAL ACCOUNTANT FEES AND SERVICES ......................................................................................... 102 

PART IV ............................................................................................................................................................................................... 103 

Item 15.  EXHIBITS AND FINANCIAL STATEMENT SCHEDULES ............................................................................... 103 

1 

 
 
 
Unless  the  context  otherwise  requires,  the  words  “we,”  “us,”  “our,”  the  “Company”  and  “Trilogy”  refer  to 
Trilogy Metals Inc., formerly  NovaCopper Inc. (“NovaCopper”), a British Columbia corporation, either alone or 
together with its subsidiaries as the context requires, as of November 30, 2016. 

CURRENCY 

All  dollar  amounts  are  in  United  States  currency  unless  otherwise  stated.  References  to  C$  or  CDN$  refer  to 
Canadian currency, $ or US$ to United States currency, and references to “Colombian pesos” or “COP” are to the 
currency of the Republic of Colombia. All dollar amounts are expressed in dollars, unless otherwise stated.  

FORWARD-LOOKING STATEMENTS 

The  information  discussed  in  this  annual  report  on  Form 10-K  includes  “forward-looking  information”  and 
“forward-looking  statements”  within  the  meaning  of  Section 21E  of  the  Securities  Exchange  Act  of  1934  (the 
“Exchange  Act”),  and  applicable  Canadian  securities  laws.  These  forward-looking  statements  may  include 
statements regarding perceived  merit of properties, exploration results and budgets,  mineral reserves and resource 
estimates,  work  programs,  capital  expenditures,  operating  costs,  cash  flow  estimates,  production  estimates  and 
similar  statements  relating  to  the  economic  viability  of  a  project,  timelines,  strategic  plans,  statements  relating 
anticipated  activity  with  respect  to  the  Ambler  Mining  District  Industrial  Access  Project  (“AMDIAP”),  the 
Company’s plans and expectations relating to the Upper Kobuk Mineral Projects, completion of transactions, market 
prices for precious and base metals, or other statements that are not statements of fact.  These statements relate to 
analyses  and  other  information  that  are  based  on  forecasts  of  future  results,  estimates  of  amounts  not  yet 
determinable and assumptions of management. 

Statements concerning mineral resource estimates may also be deemed to constitute “forward-looking statements” to 
the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any 
statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, 
objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such 
as  “expects”,  “is  expected”,  “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”, 
“strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, 
conditions or results  “may”,  “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved, or the 
negative  of  any  of  these  terms  and  similar  expressions)  are  not  statements  of  historical  fact  and  may  be  forward-
looking statements. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties 
and  other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward-looking 
statements, including, without limitation:  

• 

• 

• 

• 

• 

• 

• 

• 

risks related to inability to define proven and probable reserves; 

risks related to our ability to finance the development of our mineral properties through external financing, 
strategic alliances, the sale of property interests or otherwise; 

none of the Company’s mineral properties are in production or are under development;  

uncertainties  relating  to  the  assumptions  underlying  our  resource  estimates,  such  as  metal  pricing, 
metallurgy, mineability, marketability and operating and capital costs; 

risks related to lack of infrastructure including but not limited to the risk whether or not the AMDIAP will 
receive  the  requisite  permits  and,  if  it  does,  whether  the  Alaska  Industrial  Development  and  Export 
Authority (“AIDEA”) will build the AMDIAP; 

uncertainty  as  to  whether  there  will  ever  be  production  at  the  Company’s  mineral  exploration  and 
development properties; 

uncertainty as to estimates of capital costs, operating costs, production and economic returns; 

risks  related  to  our  ability  to  commence  production  and  generate  material  revenues  or  obtain  adequate 
financing for our planned exploration and development activities; 

3 

 
 
 
 
• 

• 

• 

• 

• 

• 

risks  related  to  future  sales  or  issuances  of  equity  securities  decreasing  the  value  of  existing  Trilogy 
common shares (“Common Shares”), diluting voting power and reducing future earnings per share; 

risks related to market events and general economic conditions; 

uncertainty related to inferred mineral resources; 

uncertainty  related  to  the  economic  projections  contained  herein  derived  from  the  Preliminary  Economic 
Assessment  titled  “Preliminary  Economic  Assessment  Report  on  the  Arctic  Project,  Ambler  Mining 
District, Northwest Alaska” dated effective September 12, 2013 (the “PEA”); 

risks related to inclement weather which may delay or hinder exploration activities at its mineral properties; 

risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of our 
mineral deposits; 

•  mining and development risks, including risks related to infrastructure, accidents, equipment breakdowns, 
labor  disputes  or  other  unanticipated  difficulties  with  or  interruptions  in  development,  construction  or 
production; 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

• 

the  risk  that  permits  and  governmental  approvals  necessary  to  develop  and  operate  mines  at  our  mineral 
properties will not be available on a timely basis or at all; 

commodity price fluctuations; 

risks related to governmental regulation and permits, including environmental regulation, including the risk 
that more stringent requirements or standards may be adopted or applied due to circumstances unrelated to 
the Company and outside of its control; 

risks related to the need for reclamation activities on our properties and uncertainty of cost estimates related 
thereto; 

uncertainty related to title to our mineral properties; 

our history of losses and expectation of future losses; 

risks related to increases in demand  for equipment, skilled labor and services needed for exploration and 
development of mineral properties, and related cost increases; 

our need to attract and retain qualified management and technical personnel; 

risks related to conflicts of interests of some of our directors; 

risks related to potential future litigation; 

risks related to the voting power of our major shareholders and the impact that a sale by such shareholders 
may have on our share price;  

risks related to global climate change; 

risks related to adverse publicity from non-governmental organizations; 

uncertainty as to the volatility in the price of the Company’s shares;  

the Company’s expectation of not paying cash dividends; 

4 

 
 
 
• 

• 

• 

adverse federal income tax consequences for U.S. shareholders should the Company be a passive foreign 
investment company;  

uncertainty as to our ability to maintain the adequacy of internal control over financial reporting as per the 
requirements of Section 404 of the Sarbanes-Oxley Act (“SOX”); and 

increased  regulatory  compliance  costs,  associated  with  rules  and  regulations  promulgated  by  the  SEC, 
Canadian  Securities  Administrators,  the  NYSE-MKT,  the  TSX,  and  the  Financial  Accounting  Standards 
Boards,  and  more  specifically,  our  efforts  to  comply  with  the  Dodd-Frank  Wall  Street  Reform  and 
Consumer Protection Act (“Dodd-Frank”). 

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  our  forward-looking  statements.  Forward-looking 
statements are statements about the future and are inherently uncertain, and our actual achievements or other future 
events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of 
risks, uncertainties and other factors, including, without limitation, those referred to in this report under the heading 
“Risk Factors” and elsewhere. 

Our forward-looking statements are based on the beliefs, expectations and opinions of management on the date the 
statements are made, and we do not assume any obligation to update forward-looking statements if circumstances or 
management’s beliefs, expectations or opinions should change, except as required by law. For the reasons set forth 
above, investors should not place undue reliance on forward-looking statements. 

CAUTIONARY NOTE TO UNITED STATES INVESTORS 

Unless  otherwise  indicated,  all  resource  estimates,  and  any  future  reserve  estimates,  included  or  incorporated  by 
reference in this annual report on Form 10-K have been, and will be, prepared in accordance with Canadian National 
Instrument  43-101  Standards  of  Disclosure  for  Mineral  Projects  (“NI  43-101”)  and  the  Canadian  Institute  of 
Mining,  Metallurgy  and  Petroleum  Definition  Standards  for  Mineral  Resources  and  Mineral  Reserves  (“CIM 
Definition Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators which establishes 
standards  for  all  public  disclosure  an  issuer  makes  of  scientific  and  technical  information  concerning  mineral 
projects.  NI  43-101  permits  the  disclosure  of  an  historical  estimate  made  prior  to  the  adoption  of  NI  43-101  that 
does not comply with NI 43-101 to be disclosed using the historical terminology if the disclosure: (a) identifies the 
source and date of the historical estimate; (b) comments on the relevance and reliability of the historical estimate; (c) 
to the extent known, provides the key assumptions, parameters and methods used to prepare the historical estimate; 
(d) states whether the historical estimate uses categories other than those prescribed by NI 43-101; and (e) includes 
any more recent estimates or data available. 

Canadian  standards,  including  NI  43-101,  differ  significantly  from  the  requirements  of  the  SEC,  and  reserve  and 
resource  information  contained  or  incorporated  by  reference  into  this  annual  report  on  Form  10-K  may  not  be 
comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of 
the  foregoing,  the  term  “resource”  does  not  equate  to  the  term  “reserves”.  Under  SEC  Industry  Guide  7, 
mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization 
could  be  economically  and  legally  produced  or  extracted  at  the  time  the  reserve  determination  is  made.  SEC 
Industry  Guide  7  does  not  define  and  the  SEC’s  disclosure  standards  normally  do  not  permit  the  inclusion  of 
information  concerning  “measured  mineral  resources”,  “indicated  mineral  resources”  or  “inferred  mineral 
resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” 
by  U.S.  standards  in  documents  filed  with  the  SEC.  U.S.  investors  should  also  understand  that  “inferred  mineral 
resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and 
legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to 
a  higher  category.  Under  Canadian  rules,  estimated  “inferred  mineral  resources”  may  not  form  the  basis  of 
feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of 
an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of “contained ounces” in a 
resource  is  permitted  disclosure  under  Canadian  regulations;  however,  the  SEC  normally  only  permits  issuers  to 
report  mineralization  that  does  not  constitute  “reserves”  by  SEC  standards  as  in-place  tonnage  and  grade  without 
reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as 
those of the SEC, and any reserves reported by us in the future in compliance with NI 43-101 may not qualify as 
“reserves” under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be 
comparable to information made public by companies that report in accordance with United States standards. 

5 

 
 
CAUTIONARY NOTE TO ALL INVESTORS CONCERNING ECONOMIC ASSESSMENTS 

THAT INCLUDE INFERRED RESOURCES 

Mineral  resources  that  are  not  mineral  reserves  have  no  demonstrated  economic  viability.  The  preliminary 
assessment  on  the  Arctic  Project  is  preliminary  in  nature  and  includes  “inferred  mineral  resources”  that  are 
considered too speculative geologically to have economic considerations applied to them that would enable them to 
be categorized as mineral reserves. There is no certainty that the feasibility studies or preliminary assessments at the 
Arctic Project will ever be realized. 

6 

 
 
GLOSSARY OF TECHNICAL TERMS  

We estimate and report our resources and we will estimate and report our reserves according to the definitions set 
forth in NI 43-101. We will modify and reconcile the reserves as appropriate to conform to SEC Industry Guide 7 
for  reporting  in  the  U.S.  The  definitions  for  each  reporting  standard  are  presented  below  with  supplementary 
explanation and descriptions of the parallels and differences. 

The following technical terms defined in this section are used throughout this Form 10-K:  

“AA” is atomic absorption. 

“Ag” is the chemical symbol for silver. 

 “AMT” is audiomagnetotelluric. 

“ARD” is acid rock drainage. 

“Au” is the chemical symbol for gold. 

“Ba” is barium. 

“CIM” is the Canadian Institute of Mining, Metallurgy and Petroleum. 

“Co” is the chemical symbol for cobalt. 

“CO2” is carbon dioxide. 

“CS-AMT” is controlled source audio-frequency magnetotelluric. 

“Cu” is the chemical symbol for copper. 

“DIGHEM” is a proprietary geophysical survey system. 

“dilution” is waste, which is unavoidably mined with ore. 

“dip” is the angle of inclination of a geological feature/rock from the horizontal. 

“EM” is electromagnetic. 

“fault” is the surface of a fracture along which movement has occurred. 

“Fe” is the surface of a fracture along which movement has occurred. 

“gangue” are non-valuable components of the ore. 

“grade” is the measure of concentration of gold within mineralized rock. 

“g” is a gram. 

“g/t” is grams per metric tonne. 

“ha” is a Hectare. 

“ICP” is induced couple plasma. 

7 

 
 
“ICP-AES” is inductively coupled plasma atomic emission spectroscopy. 

 “IRR” is internal rate of return. 

“km” is a kilometer. 

“m” is a meter. 

“masl” is meters above sea level. 

“Mg” is the chemical symbol for magnesium. 

“micron” or “µm” is 0.000001 meters. 

 “mm” is a millimeter. 

“MS” is massive sulfide. 

“MW” is million watts. 

“NPV” is net present value 

“ounce” or “oz” is a troy ounce. 

“Pb” is the chemical symbol for lead. 

“ppm” is parts per million. 

 “QA/QC” is quality assurance and quality control. 

“SG” is specific gravity. 

“SRM” is standard reference material. 

“strike”  is  the  duration  of  line  formed  by  the  intersection  of  strata  surfaces  within  the  horizontal  plane,  always 

perpendicular to the dip direction. 

“tailings” is the finely ground waste rock from which valuable minerals or metals have been extracted. 

“tonne” is a metric tonne: 1,000 kilograms or 2,204.6 pounds. 

“t/d” is tonnes per day. 

“XRF” is x-ray fluorescence spectroscopy. 

“Zn” is the chemical symbol for zinc. 

8 

 
 
CIM Definition Standards, adopted by CIM Council on May 10, 20141: 

“feasibility study means a comprehensive  technical and economic  study of  the  selected development option for  a 
mineral  project  that  includes  appropriately  detailed  assessments  of  applicable  modifying  factors  together 
with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, 
at the time of reporting, that the extraction is reasonably justified (economically mineable). The results of 
the study  may reasonably serve as the basis  for a final decision by a proponent or financial institution to 
proceed with, or finance, the development of the project. The confidence level of the study will be higher 
than that of a pre-feasibility study. 

“indicated mineral resource” means that part of a mineral resource for which quantity, grade or quality, densities, 
shape  and  physical  characteristics  are  estimated  with  sufficient  confidence  to  allow  the  application  of 
modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of 
the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and 
testing and is sufficient to assume geological and grade or quality continuity between points of observation. 
An  indicated  mineral  resource  has  a  lower  level  of  confidence  than  that  applying  to  a  measured  mineral 
resource and may only be converted to a probable mineral reserve. 

“inferred  mineral  resource”  means  that  part  of  a  mineral  resource  for  which  quantity  and  grade  or  quality  are 
estimated  on  the  basis  of  limited  geological  evidence  and  sampling.  Geological  evidence  is  sufficient  to 
imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower 
level  of  confidence  than  that  applied  to  an  indicated  mineral  resource  and  must  not  be  converted  to  a 
mineral reserve. It is reasonably expected that the majority of inferred mineral resources could be upgraded 
to indicated mineral resources with continued exploration. 

 “measured mineral resource” means that part of a mineral resource for which quantity, grade or quality, densities, 
shape  and  physical  characteristics  are  estimated  with  confidence  sufficient  to  allow  the  application  of 
modifying  factors to support detailed mine planning and  final evaluation of the economic viability of the 
deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is 
sufficient to confirm geological and grade or quality continuity between points of observation. A measured 
mineral resource has a higher level of confidence than that applying to either an indicated mineral resource 
or an inferred mineral resource. It may be converted to a proven mineral reserve or to a probable mineral 
reserve. 

“mineral  reserve”  means  the  economically  mineable  part  of  a  measured  and/or  indicated  mineral  resource.  It 
includes  diluting  materials  and  allowances  for  losses,  which  may  occur  when  the  material  is  mined  or 
extracted  and  is  defined  by  studies  at  pre-feasibility  or  feasibility  level  as  appropriate  that  include 
application of modifying factors. Such studies demonstrate that, at the time of reporting, extraction could 
reasonably be justified. The reference point at which mineral reserves are defined, usually the point where 
the ore is delivered to the processing plant, must be stated. It is important that, in all situations where the 
reference point is different, such as for a saleable product, a clarifying statement is included to ensure that 
the reader is fully informed as to what is being reported. The public disclosure of a mineral reserve must be 
demonstrated by a pre-feasibility or feasibility study. 

 “mineral resource” means a concentration or occurrence of solid material of economic interest in or on the Earth’s 
crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic 
extraction.  The  location,  quantity,  grade  or  quality,  continuity  and  other  geologic  characteristics  of  a 
mineral  resource  are  known,  estimated  or  interpreted  from  specific  geological  evidence  and  knowledge, 
including sampling.   

(1)  NI  43-101  refers  to  CIM  Definition  Standards  with  respect  to  the  definitions  of  “feasibility  study”,  “indicated  mineral  resource”,  “inferred  mineral  resource”, 
“measured  mineral resource”,  “mineral reserve”, “mineral resource”,  “modifying factors”,  “pre-feasibility study”, “probable  mineral reserve”  and  “proven  mineral 

reserve.” The CIM Definition Standards, adopted by CIM council on May 10, 2014, were the relevant standards in effect at the time of the preparation of the current 

Bornite Report (defined herein). 

9 

 
 
                                                           
 
“modifying  factors”  means  the  considerations  used  to  convert  mineral  resources  to  mineral  reserves.  These 
include,  but  are  not  restricted  to,  mining,  processing,  metallurgical,  infrastructure,  economic,  marketing, 
legal, environmental, social and governmental factors. 

“pre-feasibility study (preliminary feasibility study)” means a comprehensive study or a range of options for the 
technical and economic viability of a mineral project that has advanced to a stage where a preferred mining 
method,  in  the  case  of  underground  mining,  or  the  pit  configuration,  in  the  case  of  an  open  pit,  is 
established  and  an  effective  method  of  mineral  processing  is  determined.  It  includes  a  financial  analysis 
based on reasonable assumptions on the modifying factors and the evaluation of any other relevant factors 
which  are  sufficient  for  a  Qualified  Person,  acting  reasonably,  to  determine  if  all  or  part  of  the  mineral 
resource  many  be  converted  to  a  mineral  reserve  at  the  time  of  reporting.  A  pre-feasibility  study  is  at  a 
lower confidence level than a feasibility study. 

“probable mineral reserve” means the economically mineable part of an indicated, and in some circumstances, a 
measured mineral resource. The confidence in the modifying factors applying to a probable mineral reserve 
is lower than that applying to a proven mineral reserve. 

“proven  mineral  reserve”  means  the  economically  mineable  part  of  a  measured  mineral  resource.  A  proven 

mineral reserve implies a high degree of confidence in the modifying factors. 

CIM Definition Standards, adopted by CIM Council on November 27, 20102: 

“indicated mineral resource” means that part of a mineral resource for which quantity, grade or quality, densities, 
shape  and  physical  characteristics  can  be  estimated  with  a  level  of  confidence  sufficient  to  allow  the 
appropriate application of technical and economic parameters, to support mine planning and evaluation of 
the economic viability of the deposit.  The estimate is based on detailed and reliable exploration and testing 
information  gathered  through  appropriate  techniques  from  locations  such  as  outcrops,  trenches,  pits, 
workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably 
assumed. 

“inferred mineral resource” means that part of a mineral resource for which quantity and grade or quality can be 
estimated on the basis of geological evidence, limited sampling and reasonably assumed, but not verified, 
geological  and  grade  continuity.    The  estimate  is  based  on  limited  information  and  sampling  gathered 
through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. 

 “measured mineral resource” means that part of a mineral resource for which quantity, grade or quality, densities, 
shape  and  physical  characteristics  are  so  well-established  that  they  can  be  estimated  with  a  level  of 
confidence sufficient to allow the appropriate application of technical and economic parameters, to support 
mine planning and evaluation of the economic viability of the deposit.  The estimate is based on detailed 
and  reliable  exploration,  sampling  and  testing  information  gathered  through  appropriate  techniques  from 
locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for both 
geological and grade continuity to be reasonably assured. 

“mineral reserve” means the economically mineable part of a measured or indicated mineral resource demonstrated 
by  at  least  a  preliminary  feasibility  study.  This  study  must  include  adequate  information  on  mining, 
processing,  metallurgical,  economic  and  other  relevant  factors  that  demonstrate,  at  the  time  of  reporting, 
that economic extraction can be justified. A mineral reserve includes diluting materials and allowances for 
losses that may occur when the material is mined. 

 “mineral  resource”  means  a  concentration  or  occurrence  of  natural  solid  inorganic  material,  or  natural  solid 
fossilized organic material in or on the earth’s crust in such form and quantity and of such a grade or quality 
that  it  has  reasonable  prospects  for  economic  extraction.  The  location,  quantity,  grade,  geological 
characteristics  and  continuity  of  a  mineral  resource  are  known,  estimated  or  interpreted  from  specific 
geological evidence and knowledge.   

(2)  NI  43-101  refers  to  CIM  Definition  Standards  with  respect  to  the  definitions  of  “indicated  mineral  resource”,  “inferred  mineral  resource”,  “measured  mineral 
resource”, “mineral reserve”, “mineral resource”, “probable mineral reserve” and “proven mineral reserve.” The CIM Definition Standards, adopted by CIM council 

on November 27, 2010, were the relevant standards in effect at the time of the preparation of the Arctic Project PEA (defined herein). 

10 

 
 
                                                           
“probable mineral reserve” means the economically mineable part of an indicated and, in some circumstances, a 
measured  mineral  resource  demonstrated  by  at  least  a  preliminary  feasibility  study.    This  study  must 
include adequate information on mining, processing, metallurgical, economic and other relevant factors that 
demonstrate, at the time of reporting, that economic extraction can be justified. 

“proven mineral reserve” means the economically mineable part of a measured mineral resource demonstrated by 
at  least  a  preliminary  feasibility  study.    This  study  must  include  adequate  information  on  mining, 
processing,  metallurgical,  economic  and  other  relevant  factors  that  demonstrate,  at  the  time  of  reporting, 
that economic extraction is justified. 

SEC Industry Guide 7 Definitions:      

 “exploration stage” deposit is one which is not in either the development or production stage.  

 “development  stage”  project  is  one  which  is  undergoing  preparation  of  an  established  commercially  mineable 
deposit  for  its  extraction  but  which  is  not  yet  in  production.  This  stage  occurs  after  completion  of  a 
feasibility study.  

 “mineralized material” refers to material that is not included in the reserve as it does not meet all of the criteria for 

adequate demonstration for economic or legal extraction.  

 “probable reserve” refers to reserves for which quantity and grade and/or quality are computed from information 
similar to that used for proven (measured) reserves, but the sites for inspection, sampling, and measurement 
are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that 
for proven reserves, is high enough to assume continuity between points of observation.  

 “production stage” project is actively engaged in the process of extraction and beneficiation of mineral reserves to 

produce a marketable metal or mineral product.  

 “proven  reserve”  refers  to  reserves  for  which  (a)  quantity  is  computed  from  dimensions  revealed  in  outcrops, 
trenches, workings or drill holes; grade and/or quality are computed from the results of detailed sampling 
and (b) the sites for inspection, sampling and measurement are spaced so closely and the geologic character 
is so well defined that size, shape, depth and mineral content of reserves are well-established.  

 “reserve” refers to that part of a mineral deposit which could be economically and legally extracted or produced at 
the time of the reserve determination. Reserves must be supported by a feasibility study done to bankable 
standards  that  demonstrates  the  economic  extraction.  (“Bankable  standards”  implies  that  the  confidence 
attached to the costs and achievements developed in the study is sufficient for the project to be eligible for 
external debt financing.) A reserve includes adjustments to the in-situ tonnes and grade to include diluting 
materials and allowances for losses that might occur when the material is mined.  

11 

 
 
Item 1.  BUSINESS 

PART I 

Our  principal  business  is  the  exploration  and  development  of  our  Upper  Kobuk  Mineral  Projects  (“Upper  Kobuk 
Mineral Projects” or “UKMP Projects”) located in the Ambler mining district in Northwest Alaska, United States, 
comprising the (i) Arctic Project, which contains a high-grade polymetallic volcanogenic massive sulfide (“VMS”) 
deposit  (“Arctic  Project”);  and  (ii) Bornite  Project,  which  contains  a  carbonate-hosted  copper  deposit  (“Bornite 
Project”). Our goals include expanding mineral resources and advancing our projects through technical, engineering 
and feasibility studies so that production decisions can be made on those projects.  Our UKMP Projects are held by a 
wholly-owned  subsidiary,  NovaCopper  US  Inc.  (“NovaCopper  US”)  (dba  Trilogy  Metals  US),  registered  to  do 
business in the State of Alaska. 

Name, Address and Incorporation 

Trilogy Metals Inc. was incorporated on April 27, 2011 under the name NovaCopper Inc. pursuant to the terms of 
the  Business  Corporations  Act  (British  Columbia)  (“BCBCA”).    NovaCopper  Inc.  changed  its  name  to  Trilogy 
Metals  Inc.  on  September  1,  2016  to  better  reflect  its  diversified  metals  resource  base.    Our  registered  office  is 
located  at  Suite  2600,  Three  Bentall  Centre,  595  Burrard  Street,  Vancouver,  British  Columbia,  Canada,  and  our 
executive office is located at Suite 1950, 777 Dunsmuir Street, Vancouver, British Columbia, Canada. 

Corporate Organization Chart 

The following chart depicts our corporate structure together with the jurisdiction of incorporation of our subsidiary 
at November 30, 2016. All ownership is 100%.  

Trilogy Metals Inc. 
(formerly NovaCopper Inc.) 
(British Columbia) 

NovaCopper US Inc. 
(dba Trilogy Metals US) 
(Delaware) 

Upper Kobuk 
Mineral Projects 
(Ambler mining 
district, Alaska) 

Arctic Project 

Bornite Project 

12 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Business Cycle 

Our  business,  at  its  current  exploration  phase,  is  cyclical.    Exploration  activities  are  conducted  primarily  during 
snow-free months in Alaska.  The optimum field season at the Upper Kobuk Mineral Projects is from late May to 
late September.  The length of the snow-free season at the Upper Kobuk Mineral Projects varies from about May 
through November at lower elevations and from July through September at higher elevations. 

Trilogy’s Strategy 

Our business strategy is focused on creating value for stakeholders through our ownership and advancement of the 
Arctic Project and exploration of the Bornite Project and through the pursuit of similarly attractive mining projects.  
We plan to:   

• 

• 

• 

advance the Arctic Project towards development  with key  activities including increased definition of 
the  NI  43-101  mineral  resources,  technical  studies  to  support  completion  of  a  pre-feasibility  or 
feasibility study, and the advancement of baseline environmental studies; 

advance exploration in the Ambler mining district and, in particular, at the Bornite Project, pursuant to 
the  NANA  Agreement  (as  more  particularly  described  under  “History  of  Trilogy  –  Agreement  with 
NANA Regional Corporation”) through resource development and initial technical studies; and 

pursue project level or corporate transactions that are value accretive. 

The Arctic Project PEA represents an early stage study and highlights certain opportunities for us to further expand 
upon. Prior to commencing production, further studies that demonstrate the economic viability of the Arctic Project 
must  be  completed  including  pre-feasibility  or  feasibility  studies,  all  necessary  permits  must  be  obtained,  a 
production  decision  must  be  made  by  our  board  of  directors  (the  “Board”),  financing  for  construction  and 
development  must  be  arranged  and  construction  must  be  completed.    In  addition,  we  will  be  required  to  address 
certain infrastructure challenges, including a road for access, transportation of supplies and mineral concentrate, and 
obtain additional rights, including surface use rights and access rights.  See “Item 1A. Risk Factors.” 

Significant Developments in 2016 

•  On April 19, 2016, we released an updated resource estimate on the Bornite Project and on May 16, 2016 
filed  the  NI  43-101  compliant  Bornite  Report  (as  defined  herein).  Shallow  mineralization  located  in  the 
Ruby  Creek  Zones,  in  the  Upper  and  Lower  Reefs  are  reported  within  a  resource  limiting  pit  shell. 
Indicated in-pit resources at the Bornite deposit at a 0.50% copper cutoff are 40.5 million tonnes at 1.02% 
copper  grade.  Inferred  in-pit  resources  at  the  Bornite  deposit  at  a  0.50%  copper  cutoff  are  84.1  million 
tonnes at 0.95% copper grade. In addition to the in-pit resources, Inferred below pit resources at the Bornite 
deposit  are  reported  (at  an  elevated  1.5%  copper  cutoff)  as  57.8  million  tonnes  at  2.89%  copper  grade. 
Contained  copper  in  Indicated  Resources  has  increased  from  334  to  913  million  pounds  constituting  a 
173% increase in contained metal. Total contained copper in Inferred Resources has decreased from 5,696 
to 5,450 million pounds (1,768Mlbs in-pit and 3,683Mlbs below-pit)  which constitutes a 4% decrease in 
contained metal due principally to moving in-pit Inferred Resources to the Indicated category. The update 
incorporated a new 3D lithology, alteration and structural model for the Bornite deposit, as well as results 
from previously un-sampled or partially sampled historical Kennecott drill core. Inferred resources have a 
great amount of uncertainty as to their existence and whether they can be mined legally or economically. It 
cannot be assumed that all or any part of the Inferred resources will ever be upgraded to a higher category. 
Mineral  Resources  that  are  not  Mineral  Reserves  do  not  have  demonstrated  economic  viability.  See 
“Cautionary Note to United States Investors.” 

•  On  August  18,  2016,  we  announced  the  sale  of  our  wholly-owned  subsidiary  Sunward  Investments  Ltd. 
(“Sunward  Investments”)  which  indirectly  owns  the  Titiribi  property,  located  in  Antioquia  Province  of 
Colombia, to Brazil Resources Inc. (“BRI”) in exchange for 5 million common shares of BRI and 1 million 
warrants. Each warrant is exercisable into one common share of BRI at a price of C$3.50 per BRI common 
share until September 1, 2018. On September 1, 2016, the close of the transaction, the consideration was 
valued at $8.2 million.  

13 

 
 
 
 
•  On September 8, 2016, the change of our name to Trilogy Metals Inc., which was previously approved by 
our shareholders, became effective and our shares began trading on the TSX and the NYSE-MKT under the 
new name and symbol “TMQ”.  We changed our name to Trilogy to better reflect the diversity of minerals 
at our UKMP Projects. 

•  On October 27, 2016, we released the drill results from the safe and successful 2016 summer field program 
for the Arctic Project. We completed thirteen diamond drill holes for a total of 3,058 meters of core. The 
2016 drill program was designed to collect data for geotechnical, hydrological, waste rock characterization 
and  metallurgical studies as well as further resource definition. Three drill holes representing 822  meters 
drilled  were  designed  to  collect  geotechnical  and  hydrological  data  within  the  proposed  Arctic  open-pit. 
Four  drill  holes  representing  1,030  meters  drilled  were  designed  to  collect  metallurgical  samples, 
specifically  targeting  material  within  the  initial  production  years  of  the  Arctic  open-pit.  Six  drill  holes 
representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high grade 
polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources 
to Measured and Indicated resource classification within the area of the proposed Arctic open-pit. We were 
pleased  to  announce  that  all  six  infill  holes  encountered  mineralized  intervals  consistent  with  previous 
drilling  conducted  within  the  resource  area  on  the  property. The  updated  geology  domains  and  drill  data 
will  be  incorporated  into  an  updated  resource  estimate  that  will  support  a  future  pre-feasibility  study.  In 
addition to the drill program, we conducted an aquatics survey, avian survey, habitat survey, archaeological 
survey, and wetlands delineation survey, and continued ongoing baseline environmental data collection and 
acid-base-accounting/metal  leaching  sampling.  The  LiDAR  survey  that  was  incomplete  last  year  due  to 
weather conditions was also completed during the summer field program. 

Significant Developments in 2015 

•  On  June  19,  2015,  we  announced  the  completion  of  a  Plan  of  Arrangement  (the  “Arrangement”)  with 
Sunward Resources Ltd. (“Sunward”), a publicly listed company on the TSX, resulting in the acquisition of 
Sunward by Trilogy. Under the terms of the Arrangement, Sunward shareholders received 0.3 of a Trilogy 
Common Share for each Sunward common share held resulting in the Company issuing approximately 43.1 
million Common Shares to Sunward shareholders and Sunward directors holding Sunward deferred share 
units. Each Sunward stock option outstanding was exchanged for a fully-vested option to purchase Trilogy 
Common  Shares  (a  “Sunward  Arrangement  Option”)  for  a  period of  90  days,  with  the  number  of  shares 
issuable  and  exercise  price  adjusted  based  on  an  exchange  ratio  of  0.3.  A  total  of  2,505,000  Sunward 
Arrangement Options were issued to holders of Sunward stock options at closing.  

•  On October 21, 2015, we announced the drill results from our 2015 summer field program for the Arctic 
Project. In total, fourteen diamond drill holes were completed amounting to a total of 3,056 meters drilled. 
In  addition  to  the  twelve  resource  estimation  drill  holes,  two  drill  holes,  representing  631  meters  drilled, 
were  completed  to  support  preliminary  rock  mechanics  and  geotechnical  studies  and  a  hydrogeological 
assessment  of  the  proposed  Arctic  open-pit.    All  fourteen  drill  holes  encountered  mineralized  intervals, 
defined as a minimum of 1.0 meter copper interval with average grade >0.7% copper. 

•  On  October  22,  2015,  we  announced  that  Alaska’s  Governor  has  authorized  AIDEA  to  begin  the 
environmental  impact  statement  (“EIS”)  process  on  AMDIAP,  formerly  known  as  the  Ambler  Mining 
District Industrial Access Road. 

Significant Developments in 2014 

•  On March 18, 2014, Trilogy reported an updated NI 43-101 resource estimate for the Bornite Project in a 
report  entitled  “NI  43-101  Technical  Report  on  the  Bornite  Project,  Northwest  Alaska,  USA”,  dated 
effective April 1, 2014, which updated the resource estimate previously released on February 5, 2013. At 
the  base  case  0.5%  copper  cut-off  grade,  the  Bornite  Project  was  estimated  to  contain  in-pit  Indicated 
Resources of 14.1 million tonnes of 1.08% Cu or 334 million pounds of contained copper. At the base case 
0.5% copper cut-off grade, the Bornite Project was estimated to contain in-pit Inferred Resources of 109.6 
million  tonnes  of  0.94%  Cu  or  2,259  million  pounds  of  contained  copper.  Resources  were  stated  as 
potentially being economically  viable in an open-pit  mining scenario based on a projected metal price of 
$3.00 per pound copper, total site operating costs of $18.00 per tonne, 87% metallurgical recoveries and an 
average  pit  slope  of  43  degrees.  At  the  base  case  1.5%  copper  cut-off  grade,  the  Bornite  Project  was 
estimated  to  contain  below-pit  Inferred  Resources  of  55.6  million  tonnes  of  2.81%  Cu  or  3,437  million 

14 

 
 
 
 
 
 
 
pounds of contained copper. Inferred resources were stated as potentially being economically viable in an 
underground  mining  scenario  based  on  a  projected  metal  price  of  $3.00  per  pound  copper,  total  site 
operating costs of $66.00 per tonne and an average metallurgical recovery of 87%. Inferred resources have 
a great amount of uncertainty as to their existence and whether they can be mined legally or economically. 
It  cannot  be  assumed  that  all  or  any  part  of  the  Inferred  resources  will  ever  be  upgraded  to  a  higher 
category. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 
See “Cautionary Note to United States Investors.” 

•  On July 7, 2014, we announced the completion of a non-brokered private placement of approximately $7.5 
million  in  units  to  existing  shareholders.  Each  unit  was  priced  at  $1.15  per  unit  and  consisted  of  one 
Common Share and one Common share purchase warrant.  Each common share purchase warrant entitles 
the holders to purchase one Common Share at a price of $1.60 per share for a period of five years from the 
closing date.  Net proceeds from the private placement were $7.2 million. The gross proceeds raised were 
allocated for the 12 months following closing to fund $2.7 million on program expenditures, $4.0 million 
on  general  and  administrative  expenses  including  costs  associated  with  the  offering,  and  $0.8  million  on 
one-time expenses incurred in reducing annual general and administrative expenses. 

•  On August 15, 2014, we announced the departure of our Senior VP Exploration, VP Human Resources and 
Workforce Development, and VP Corporate Communications from our senior management team to reduce 
our general and administrative expenses. 

•  On  October  28,  2014,  we  announced  the  results  of  our  2014  re-logging  and  re-sampling  program  at  the 
Bornite  Project.  During  the  2014  field  season,  we  re-logged  the  geology  and  re-sampled  approximately 
13,000 meters in 37 historical drill holes, originally drilled by Kennecott on the Bornite Project between 
1959 and 1976, and submitted the samples for a complete 42 element Induced Coupled Plasma analysis. Of 
the 37 historic drill holes sampled, 5 holes had intervals of copper grading more than 0.5% copper, and 21 
holes contained mineralization grading more than 0.2% copper. 

History of Trilogy  

Spin-Out 

We were formerly a wholly-owned subsidiary of NovaGold Resources Inc. (“NovaGold”).  At a special meeting of 
securityholders  of  NovaGold  held  on  March  28,  2012,  the  securityholders  voted  in  favour  of  a  special  resolution 
approving  the  distribution  of  Common  Shares  of  Trilogy  to  the  shareholders  of  NovaGold  as  a  return  of  capital 
through a statutory Plan of Arrangement under the Companies Act (Nova Scotia).   

On  April  30,  2012,  all  of  the  outstanding  Trilogy  Common  Shares  were  distributed  to  shareholders  of  NovaGold 
such  that  each  NovaGold  shareholder  of  record  at  the  close  of  business  on  April  27,  2012  received  one  Trilogy 
Common Share for every six common shares in the capital of NovaGold held at that time.  The Trilogy Common 
Shares were listed and posted for trading on the TSX and on the NYSE-MKT under its previous symbol, NCQ, and 
former name, NovaCopper, on April 25, 2012. 

Name Change 

We changed our corporate name to Trilogy Metals Inc. from NovaCopper Inc. in 2016 to better reflect the diversity 
of minerals at our UKMP Projects. On September 8, 2016, upon the opening of the markets our shares began trading 
on the TSX and the NYSE-MKT under the symbol “TMQ”.   

Agreement with NANA Regional Corporation 

On October 19, 2011, NANA Regional Corporation, Inc. (“NANA”), an Alaska Native Corporation headquartered 
in Kotzebue, Alaska, and NovaCopper US entered an Exploration Agreement and Option Agreement, as amended 
(the “NANA Agreement”) for the cooperative development of NANA’s respective resource interests in the Ambler 
mining district of Northwest Alaska.  The NANA Agreement consolidates our and NANA’s land holdings into an 
approximately  142,831-hectare  land  package  and  provides  a  framework  for  the  exploration  and  any  future 
development of this high-grade and prospective poly-metallic belt. 

15 

 
 
 
 
 
 
 
The NANA Agreement grants NovaCopper US the nonexclusive right to enter on, and the exclusive right to explore, 
the Bornite lands and the  Alaska Native Claims Settlement Act (“ANCSA”) lands (each as defined in the NANA 
Agreement) and in connection therewith, to construct and utilize temporary access roads, camps, airstrips and other 
incidental works.  In consideration for this right, NovaCopper US paid to NANA $4 million in cash.  NovaCopper 
US is also required to make payments to NANA for scholarship purposes in accordance with the terms of the NANA 
Agreement.  NovaCopper US has further agreed to use reasonable commercial efforts to train and employ NANA 
shareholders to perform work for NovaCopper US in connection with its operations on the Bornite lands, ANCSA 
lands  and  Ambler  lands  (as  defined  in  the  NANA  Agreement)  (collectively,  the  “Lands”).  Under  the  NANA 
Agreement,  NANA  also  has  the  right  to  appoint  a  board  member  to  Trilogy’s  Board  within  a  five  year  period 
following our public listing on a stock exchange.  

The NANA Agreement has a term of 20 years, with an option in favour of NovaCopper US to extend the term for an 
additional 10 years. The NANA Agreement may be terminated by mutual agreement of the parties or by NANA if 
NovaCopper US does not meet certain expenditure requirements on the Bornite lands and ANCSA lands. 

If, following receipt of a feasibility study and the release for public comment of a related draft environmental impact 
statement,  we decide to proceed with construction of a mine on the Lands, NovaCopper US will notify NANA in 
writing and NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire an 
undivided  ownership  interest  between  16%  and  25%  (as  specified  by  NANA)  of  that  specific  project;  or  (b)  not 
exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized by 
NovaCopper US from such project (following the recoupment by NovaCopper US of all costs incurred, including 
operating, capital and carrying costs). The cost to exercise such back-in-right is equal to the percentage interest in 
the  project  multiplied  by  the  difference  between  (i)  all  costs  incurred  by  NovaCopper  US  or  its  affiliates  on  the 
project, including historical costs incurred prior to the date of the NANA Agreement together  with interest on the 
costs;  and  (ii) $40 million  (subject  to  exceptions).  This  amount  will  be  payable  by  NANA  to  NovaCopper  US  in 
cash at the time the parties enter into a joint venture agreement and in no event will the amount be less than zero.  

In the event that NANA elects to exercise its back-in-right, the parties will as soon as reasonably practicable form a 
joint  venture,  with  NANA’s  interest  being  between  16%  to  25%  and  NovaCopper  US  owning  the  balance  of  the 
interest in the joint venture. Upon formation of the joint venture, the joint venture will assume all of the obligations 
of NovaCopper US and be entitled to all the benefits of NovaCopper US under the NANA Agreement in connection 
with  the  mine  to  be  developed  and  the  related  Lands.  A  party’s  failure  to  pay  its  proportionate  share  of  costs  in 
connection  with the joint venture  will result in dilution of  its interest. Each party  will  have a right of  first refusal 
over  any  proposed  transfer  of  the  other  party’s  interest  in  the  joint  venture  other  than  to  an  affiliate  or  for  the 
purposes of granting security.  A transfer by either party of any net proceeds royalty interest in a project other than 
for financing purposes will also be subject to a first right of refusal. A transfer of NANA’s net smelter return on the 
Lands is subject to a first right of refusal by NovaCopper US. 

In  connection  with  possible  development  of  a  mine  on  the  Bornite  lands  or  ANCSA  lands,  NovaCopper  US  and 
NANA will execute a mining lease to allow NovaCopper US or the joint venture to construct and operate a mine on 
the Bornite lands or ANCSA lands. These leases will provide NANA a 2% net smelter royalty as to production from 
the  Bornite  lands  and  a  2.5%  net  smelter  royalty  as  to  production  from  the  ANCSA  lands.  If  NovaCopper  US 
decides to proceed with construction of a mine on the Ambler lands, NANA will enter into a surface use agreement 
with  NovaCopper  US  which  will  afford  NovaCopper  US  access  to  the  Ambler  lands  along  routes  approved  by 
NANA on the Bornite lands or ANCSA lands. In consideration for the grant of such surface use rights, NovaCopper 
US will grant NANA a 1% net smelter royalty on production and an annual payment of $755 per acre (as adjusted 
for inflation each year beginning with the second anniversary of the effective date of the NANA Agreement and for 
each of  the first 400 acres (and $100 for each additional acre) of the  lands owned by  NANA and  used  for access 
which are disturbed and not reclaimed. 

We have formed an oversight committee with NANA, which consists of four representatives from each of Trilogy 
and  NANA  (the  “Oversight  Committee”).  The  Oversight  Committee  is  responsible  for  certain  planning  and 
oversight matters carried out by us under the NANA Agreement.  The planning and oversight matters that are the 
subject of the NANA Agreement will be determined by majority vote.  The representatives of each of Trilogy and 
NANA attending a meeting will have one vote in the aggregate and in the event of a tie, the Trilogy representatives 
jointly shall have a deciding vote on all matters other than Subsistence Matters, as that term is defined in the NANA 
Agreement.    There  shall  be  no  deciding  vote  on  Subsistence  Matters  and  we  may  not  proceed  with  such  matters 
unless approved by majority vote of the Oversight Committee or with the consent of NANA, such consent not to be 
unreasonably withheld or delayed. 

16 

 
 
Principal Markets 

We do not currently have a principal market. Our principal objective is to become a producer of copper.   

Specialized Skill and Knowledge 

All aspects of our business require specialized skills and knowledge.  Such skills and knowledge include the areas of 
geology,  mining  and  accounting.    See  “Executive  Officers  of  Trilogy”  for  details  as  to  the  specific  skills  and 
knowledge of our directors and management. 

Environmental Protection 

Mining is an extractive industry that impacts the environment.  Our goal is to evaluate ways to minimize that impact 
and  to  develop  safe,  responsible  and  profitable  operations  by  developing  natural  resources  for  the  benefit  of  our 
employees,  shareholders  and  communities  and  maintain  high  standards  for  environmental  performance  at  our 
UKMP Projects.  We strive to meet or exceed environmental standards at our UKMP Projects.  One way we do this 
is through collaborations with local communities in Alaska, including Native Alaskan groups.  Our environmental 
performance will be overseen at the Board level and environmental performance is the responsibility of the project 
manager. 

•  All  new  activities  and  operations  will  be  managed  for  compliance  with  applicable  laws  and 
regulations.    In  the  absence  of  regulation,  best  management  practices  will  be  applied  to  manage 
environmental risk. 

•  We will strive to limit releases to the air, land or water and appropriately treat and dispose of waste. 

See “Arctic Project – Environmental Considerations.” 

Employees  

As  of  November  30,  2016,  we  had  7  full-time  employees,  all  of  whom  were  employed  at  our  executive  office  in 
Vancouver, BC. The number of individuals employed by us fluctuates throughout the year depending on the season; 
however,  during  2016,  we  had,  on  average,  15  employees  working  for  us.  We  have  entered  into  executive 
employment agreements with two individuals, the CEO and CFO.   

We believe our success is dependent on the performance  of our  management and key  employees,  many of  whom 
have specialized skills in exploration in Alaska and the base metals industry. Substantially all of our exploration site 
employees have been active in the  Ambler  mining district  for the last  five  years and are knowledgeable as to  the 
geology, metallurgy and infrastructure related to mining development. 

Executive Officers of Trilogy 

As  of  November  30,  2016,  we  had  two  executive  officers,  namely  Rick  Van  Nieuwenhuyse  and  Elaine  Sanders.  
The following information is presented as of November 30, 2016.  

Name and Residence 
Rick Van Nieuwenhuyse 
British Columbia, Canada 
Director, President and Chief Executive 
Officer 

Age 
61 

Held Office Since 
April 29, 2011(1) 

Business Experience During Past Five 
Years 

Chief Executive Officer of Trilogy 
(2011 – present); Former President 
and Chief Executive Officer of 
NovaGold 

17 

 
 
 
 
 
 
 
 
 
Name and Residence 
Elaine Sanders 
British Columbia, Canada 
VP, Chief Financial Officer and Corporate 
Secretary 

Age 
47 

Held Office Since 
January 30, 2012(2) 

Business Experience During Past Five 
Years 

VP and Chief Financial Officer of 
Trilogy (2012 – present); Corporate 
Secretary of Trilogy (2011 – present); 
Vice President, Chief Financial 
Officer and Corporate Secretary of 
NovaGold (2011 – 2012); and Vice 
President Finance of NovaGold (2006 
– 2011). 

(1)  Mr.  Van  Nieuwenhuyse  was  appointed  President  and  Chief  Executive  Officer  on  April  29,  2011.  He  became  a  full-time 
employee of the Company on January 9, 2012. 
(2) Ms. Sanders was appointed Chief Financial Officer on January 30, 2012. She became a full-time employee of the Company on 
November 13, 2012. 

Segment Information 

The  Company’s  reportable  segments  are  based  on  geographic  region  for  the  Company’s  operations.  Segment 
information  relating  to  our  assets  is  provided  under  the  section  heading  “Item  8.  Financial  Statements  and 
Supplementary Data” below.   

Competitive Conditions 

The  mineral  exploration  and  development  industry  is  competitive  in  all  phases  of  exploration,  development  and 
production.  There  is  a  high  degree  of  competition  faced  by  us  in  Alaska  and  elsewhere  for  skilled  management 
employees,  suitable  contractors  for  drilling  operations,  technical  and  engineering  resources,  and  necessary 
exploration  and  mining  equipment,  and  many  of  these  competitor  companies  have  greater  financial  resources, 
operational expertise, and/or more advanced properties than us. Additionally, our operations are in a remote location 
where skilled resources and support services are limited. We have in place experienced management personnel and 
continue to evaluate the required expertise and skills to carry out our operations.  As a result of this competition, we 
may be unable to achieve our exploration and development in the future on terms we consider acceptable or at all.  
See “Item 1A. Risk Factors.” 

Available Information 

We make available, free of charge, on or through our website, at www.trilogymetals.com our annual report on Form 
10-K, which includes our audited financial statements, our quarterly reports on Form 10-Q, and our current reports 
on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange 
Act. You may read and copy any materials filed with the SEC free of charge at the SEC’s Public Reference Room, 
100  F  Street,  N.E.,  Washington,  D.C.  20549  and  you  may  obtain  information  on  the  operation  of  the  Public 
Reference Room by calling the SEC at 1-800-SEC-0330. The SEC maintains a website that contains reports, proxy 
and information statements, and other information at http://www.sec.gov. Our website and the information contained 
therein or connected thereto are not intended to be, and are not incorporated into this annual report on Form 10-K. 

Item 1A.  RISK FACTORS 

Investing in our securities is speculative and involves a high degree of risk due to the nature of our business and the 
present stage of exploration of our mineral properties. The following risk factors, as well as risks currently unknown 
to us, could materially adversely affect our future business, operations and financial condition and could cause them 
to differ materially from the estimates described in forward-looking information relating to Trilogy, or our business, 
property  or  financial  results,  each  of  which  could  cause  purchasers  of  securities  to  lose  all  or  part  of  their 
investments.  

We have not defined any proven or probable reserves and none of our mineral properties are in production 
or under development. 

18 

 
 
 
 
 
 
 
 
 
We  have  no  history  of  commercially  producing  precious  or  base  metals  and  all  of  our  properties  are  in  the 
exploration stage. We have not defined or delineated any measured mineral resources or proven or probable reserves 
on our Upper Kobuk Mineral Projects. Mineral exploration involves significant risk, since few properties that are 
explored contain bodies of ore that would be commercially economic to develop into producing mines.  We cannot 
assure  you  that  we  will  establish  the  presence  of  any  measured  resources,  or  proven  or  probable  reserves  at  the 
Upper  Kobuk  Mineral  Projects,  or  any  other  properties.  The  failure  to  establish  measured  mineral  resources,  or 
proven or probable reserves, would severely restrict our ability to implement our strategies for long-term growth. 

We  may  not  have  sufficient  funds  to  develop  our  mineral  projects  or  to  complete  further  exploration 
programs. 

We  have  limited  financial  resources.  We  currently  generate  no  mining  operating  revenue,  and  must  primarily 
finance  exploration  activity  and  the  development  of  mineral  projects  by  other  means.  In  the  future,  our  ability  to 
continue exploration, development and production activities, if any, will depend on our ability to obtain additional 
external  financing.  Any  unexpected  costs,  problems  or  delays  could  severely  impact  our  ability  to  continue 
exploration and development activities.  The failure to meet ongoing obligations on a timely basis could result in a 
loss or a substantial dilution of our interests in projects. 

The sources of external financing that we may use for these purposes include project or bank financing or public or 
private offerings of equity and debt. In addition, we may enter into one or more strategic alliances or joint ventures, 
decide  to  sell  certain  property  interests,  or  utilize  one  or  a  combination  of  all  of  these  alternatives.  The  financing 
alternative we choose may not be available on acceptable terms, or at all. If additional financing is not available, we 
may have to postpone further exploration or development of, or sell, one or more of our principal properties. 

Even  if  one  of  our  mineral  projects  is  determined  to  be  economically  viable  to  develop  into  a  mine,  such 
development may not be successful. 

If  the  development  of  one  of  our  projects  is  found  to  be  economically  feasible  and  approved  by  our  Board,  such 
development  will  require  obtaining  permits  and  financing,  the  construction  and  operation  of  mines,  processing 
plants and related infrastructure, including road access. As a result, we are and will continue to be subject to all of 
the risks associated with establishing new mining operations, including: 

• 

• 

• 

• 

• 

• 

• 

the timing and cost, which can be considerable, of the construction of mining and processing facilities 
and related infrastructure; 

the availability and cost of skilled labor and mining equipment; 

the availability and cost of appropriate smelting and refining arrangements; 

the  need  to  obtain  necessary  environmental  and  other  governmental  approvals  and  permits  and  the 
timing of the receipt of those approvals and permits; 

the availability of funds to finance construction and development activities; 

potential  opposition  from  non-governmental  organizations,  environmental  groups  or  local  groups 
which may delay or prevent development activities; and 

potential  increases  in  construction  and  operating  costs  due  to  changes  in  the  cost  of  fuel,  power, 
materials and supplies. 

The costs, timing and complexities of developing our projects may be greater than anticipated because our property 
interests  are  not  located  in  developed  areas,  and,  as  a  result,  our  property  interests  are  not  currently  served  by 
appropriate  road  access,  water  and  power  supply  and  other  support  infrastructure.  Cost  estimates  may  increase 
significantly as more detailed engineering work is completed on a project. It is common in new mining operations to 
experience unexpected costs, problems and delays during construction, development and mine start-up. In addition, 
delays in the early stages of mineral production often occur. Accordingly, we cannot provide assurance that we will 
ever achieve, or that our activities will result in, profitable mining operations at our mineral properties.   

19 

 
 
In addition, there can be no assurance that our  mineral exploration activities  will result in any discoveries of new 
mineralization.  If  further  mineralization  is  discovered  there  is  also  no  assurance  that  the  mineralization  would  be 
economical  for commercial production. Discovery of  mineral deposits is dependent upon a number of factors and 
significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a 
mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of 
the deposit, commodity prices, government policies and regulation and environmental protection. 

The  Upper  Kobuk  Mineral  Projects  are  located  in  a  remote  area  of  Alaska,  and  access  to  them  is  limited. 
Exploration  and  any  future  development  or  production  activities  may  be  limited  and  delayed  by 
infrastructure challenges, inclement weather and a shortened exploration season. 

The  Upper  Kobuk  Mineral  Projects  are  located  in  a  remote  area  of  Alaska.    Access  to  the  Upper  Kobuk  Mineral 
Projects is limited and there is currently no infrastructure in the area.  

We cannot provide assurances that the proposed AMDIAP that would provide access to the Ambler mining district 
will be permitted or built, that it will be built in a timely manner, that the cost of accessing the proposed road will be 
reasonable, that it will be built in the manner contemplated, or that it will sufficiently satisfy the requirements of the 
Upper  Kobuk  Mineral  Projects.  In  addition,  successful  development  of  the  Upper  Kobuk  Mineral  Projects  will 
require  the  development  of  the  necessary  infrastructure.  If  adequate  infrastructure  is  not  available  in  a  timely 
manner, there can be no assurance that: 

• 

• 

• 

the development of the Upper Kobuk Mineral Projects will be commenced or completed on a timely 
basis, if at all; 

the resulting operations will achieve the anticipated production volume; or 

the  construction  costs  and  operating  costs  associated  with  the  development  of  the  Upper  Kobuk 
Mineral Projects will not be higher than anticipated. 

As  the  Upper  Kobuk  Mineral  Projects  are  located  in  a  remote  area,  exploration,  development  and  production 
activities may be limited and delayed by inclement weather and a shortened exploration season. 

We have no history of production and no revenue from mining operations. 

We  have  a  very  limited  history  of  operations  and  to  date  have  generated  no  revenue  from  mining  operations.  As 
such,  we  are  subject  to  many  risks  common  to  such  enterprises,  including  under-capitalization,  cash  shortages, 
limitations  with  respect  to  personnel,  financial  and  other  resources  and  lack  of  significant  revenues.  There  is  no 
assurance that the Upper Kobuk Mineral Projects, or any other future projects will be commercially mineable, and 
we may never generate revenues from our mining operations. 

Future sales or issuances of equity securities could decrease the value of any existing Common Shares, dilute 
investors’ voting power and reduce our earnings per share. 

We may sell additional equity securities (including through the sale of securities convertible into Common Shares) 
and may issue additional equity securities to finance our operations, exploration, development, acquisitions or other 
projects. We are authorized to issue an unlimited number of Common Shares. We cannot predict the size of future 
sales and issuances of equity securities or the effect, if any, that future sales and issuances of equity securities will 
have on the market price of the Common Shares. Sales or issuances of a substantial number of equity securities, or 
the perception that such sales could occur, may adversely affect prevailing market prices for the Common Shares. 
With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may 
experience dilution in our earnings per share. 

Changes in the market price of copper, gold and other metals, which in the past have fluctuated widely, will 
affect our ability to finance continued exploration and development of our projects and affect our operations 
and financial condition. 

Our long-term viability will depend, in large part, on the market price of copper, gold and other metals. The market 
prices for these metals are volatile and are affected by numerous factors beyond our control, including: 

20 

 
 
• 

• 

• 

• 

• 

• 

global or regional consumption patterns; 

the supply of, and demand for, these metals; 

speculative activities; 

the availability and costs of metal substitutes; 

expectations for inflation; and 

political and economic conditions, including interest rates and currency values. 

We cannot predict the effect  of these  factors on  metal prices.  A decrease in  the  market  price of copper, gold and 
other metals could affect our ability to raise funds to finance the exploration and development of any of our mineral 
projects, which would have a material adverse effect on our financial condition and results of operations. The market 
price  of  copper,  gold  and  other  metals  may  not  remain  at  current  levels.  In  particular,  an  increase  in  worldwide 
supply,  and  consequent  downward  pressure  on  prices,  may  result  over  the  longer  term  from  increased  copper 
production from mines developed or expanded as a result of current metal price levels. There is no assurance that a 
profitable market may exist or continue to exist. 

Actual  capital  costs,  operating  costs,  production  and  economic  returns  may  differ  significantly  from  those 
described in the PEA. 

The PEA technical report for the Arctic Project is an early stage study that is preliminary in nature. There can be no 
assurance that the results described in the PEA will be realized. The capital costs to take our projects into production 
may be significantly higher than anticipated. 

None  of  our  mineral  properties  have  an  operating  history  upon  which  we  can  base  estimates  of  future  operating 
costs. Decisions about the development of the Arctic Project (or the Bornite Project) will ultimately be based upon 
feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things: 

• 

• 

• 

• 

anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed; 

anticipated recovery rates of metals from the ore; 

cash operating costs of comparable facilities and equipment; and 

anticipated climatic conditions. 

Cash  operating  costs,  production  and  economic  returns,  and  other  estimates  contained  in  studies  or  estimates 
prepared by or for us may differ significantly from those anticipated by the PEA and there can be no assurance that 
our actual operating costs will not be higher than currently anticipated. 

We will incur losses for the foreseeable future. 

We  expect  to  incur  losses  unless  and  until  such  time  as  our  mineral  projects  generate  sufficient  revenues  to  fund 
continuing operations. The exploration and development of our mineral properties will require the commitment of 
substantial financial resources that may not be available. 

The  amount  and  timing  of  expenditures  will  depend  on  a  number  of  factors,  including  the  progress  of  ongoing 
exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating 
losses  are  incurred,  the  execution  of  any  joint  venture  agreements  with  strategic  partners  and  the  acquisition  of 
additional property interests, some of which are beyond our control. We cannot provide assurance that we will ever 
achieve profitability. 

21 

 
 
Mineral resource and reserve calculations are only estimates. 

Any  figures  presented  for  mineral  resources  in  this  Form  10-K  and  in  our  other  filings  with  securities  regulatory 
authorities and those which may be presented in the future or any figures for mineral reserves that may be presented 
by us in the future are and will only be estimates. There is a degree of uncertainty attributable to the calculation of 
mineral  reserves  and  mineral  resources.  Until  mineral  reserves  or  mineral  resources  are  actually  mined  and 
processed, the quantity of  metal and grades  must be considered as estimates only and no assurances can be given 
that the indicated levels of metals will be produced. In making determinations about whether to advance any of our 
projects  to  development,  we  must  rely  upon  estimated  calculations  as  to  the  mineral  resources  and  grades  of 
mineralization on our properties.  

The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment of the 
persons  preparing  the  estimates.  The  process  relies  on  the  quantity  and  quality  of  available  data  and  is  based  on 
knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given 
time may significantly change when new information becomes available. While we believe that the mineral resource 
estimates  included  in  this  Form  10-K  for  the  Upper  Kobuk  Mineral  Projects  are  well-established  and  reflect 
management’s  best  estimates,  by  their  nature  mineral  resource  estimates  are  imprecise  and  depend,  to  a  certain 
extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate.  There 
can  be  no  assurances  that  actual  results  will  meet  the  estimates  contained  in  feasibility  studies.    As  well,  further 
studies are required. 

Estimated  mineral  reserves  or  mineral  resources  may  have  to  be  recalculated  based  on  changes  in  metal  prices, 
further  exploration  or  development  activity  or  actual  production  experience.  This  could  materially  and  adversely 
affect estimates of the  volume or grade of  mineralization,  estimated recovery rates or other important  factors that 
influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be 
reclassified  as  mineral  reserves  is  dependent  upon  the  demonstration  of  their  profitable  recovery.  Any  material 
changes in  mineral resource estimates and grades of  mineralization  will affect the economic viability of placing a 
property into production and a property’s return on capital. We cannot provide assurance that mineralization can be 
mined or processed profitably. 

Our  mineral  resource  estimates  have  been  determined  and  valued  based  on  assumed  future  metal  prices,  cut-off 
grades  and  operating  costs  that  may  prove  to  be  inaccurate.  Extended  declines  in  market  prices  for  copper,  zinc, 
lead, gold and silver may render portions of our mineralization uneconomic and result in reduced reported mineral 
resources, which in turn could have a material adverse effect on our results of operations or financial condition. We 
cannot provide assurance that mineral recovery rates achieved in small scale tests will be duplicated in large scale 
tests under on-site conditions or in production scale. 

A reduction in any mineral reserves that may be estimated by us in the future could have an adverse impact on our 
future  cash  flows,  earnings,  results  of  operations  and  financial  condition.  No  assurances  can  be  given  that  any 
mineral resource estimates for the Upper Kobuk Mineral Projects will ultimately be reclassified as mineral reserves. 
See “Cautionary Note to United States Investors.” 

Significant uncertainty exists related to inferred mineral resources.  

There is a risk that inferred mineral resources referred to in this Form 10-K cannot be converted into measured or 
indicated  mineral resources as there  may be limited ability to assess  geological continuity. Due  to the  uncertainty 
that may attach to inferred mineral resources, there is no assurance that inferred mineral resources will be upgraded 
to resources with sufficient geological continuity to constitute proven and probable mineral reserves as a result of 
continued exploration. See “Cautionary Note to United States Investors.” 

Mining is inherently risky and subject to conditions or events beyond our control. 

The development and operation of a mine is inherently dangerous and involves many risks that even a combination 
of experience, knowledge and careful evaluation may not be able to overcome, including: 

• 

unusual or unexpected geological formations; 

•  metallurgical and other processing problems; 

22 

 
 
•  metal losses; 

• 

• 

• 

• 

• 

• 

environmental hazards; 

power outages; 

labor disruptions; 

industrial accidents; 

periodic interruptions due to inclement or hazardous weather conditions; 

flooding, explosions, fire, rockbursts, cave-ins and landslides; 

•  mechanical equipment and facility performance problems; and 

• 

the availability of materials and equipment. 

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, 
personal injury or death, including to our employees, environmental damage, delays in mining, increased production 
costs,  asset  write  downs,  monetary  losses  and  possible  legal  liability.  We  may  not  be  able  to  obtain  insurance  to 
cover  these  risks  at  economically  feasible  premiums,  or  at  all.  Insurance  against  certain  environmental  risks, 
including potential liability  for pollution and other hazards  associated  with  mineral exploration and production, is 
not  generally  available  to  companies  within  the  mining  industry.  We  may  suffer  a  material  adverse  effect  on  our 
business if we incur losses related to any significant events that are not covered by our insurance policies. 

General economic conditions may adversely affect our growth, future profitability and ability to finance. 

The unprecedented events in global financial markets in the past several years have had a profound impact on the 
global economy. Many industries, including the copper mining industry, are impacted by these market conditions. 
Some of the key impacts of the current financial market turmoil include contraction in credit markets resulting in a 
widening  of  credit  risk,  devaluations,  high  volatility  in  global  equity,  commodity,  foreign  exchange  and  precious 
metal markets and a lack of market liquidity. A worsening or slowdown in the financial markets or other economic 
conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel 
and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and 
tax rates, may adversely affect our growth and ability to finance. Specifically: 

• 

• 

• 

• 

• 

the volatility of copper, gold and other metal prices would impact our estimates of mineral resources, 
revenues, profits, losses and cash flow, and the feasibility of our projects; 

negative economic pressures could adversely impact demand for our future production, if any; 

construction related costs could increase and adversely affect the economics of any project; 

volatile  energy,  commodity  and  consumables  prices  and  currency  exchange  rates  would  impact  our 
estimated production costs; and 

the  devaluation  and  volatility  of  global  stock  markets  would  impact  the  valuation  of  our  equity  and 
other securities. 

We cannot provide assurance that we will successfully acquire commercially mineable mineral rights. 

Exploration  for  and  development  of  copper  and  gold  properties  involves  significant  financial  risks  which  even  a 
combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body 
may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. 
Major expenses may be required to establish reserves by drilling, constructing mining and processing facilities at a 
site,  developing  metallurgical  processes  and  extracting  metals  from  ore.  We  cannot  ensure  that  our  current 
exploration and development programs will result in profitable commercial mining operations. 

23 

 
 
The  economic  feasibility  of  development  projects  is  based  upon  many  factors,  including  the  accuracy  of  mineral 
resource estimates; metallurgical recoveries; capital and operating costs; government regulations relating to prices, 
taxes,  royalties,  land  tenure,  land  use,  importing  and  exporting  and  environmental  protection;  and  metal  prices, 
which are highly volatile. Development projects are also subject to the successful completion of feasibility studies, 
issuance of necessary governmental permits and availability of adequate financing. 

Most exploration projects do not result in the discovery of commercially  mineable ore deposits, and no assurance 
can  be  given  that  any  anticipated  level  of  recovery  of  ore  reserves,  if  any,  will  be  realized  or  that  any  identified 
mineral  deposit  will  ever  qualify  as  a  commercially  mineable  (or  viable)  ore  body  which  can  be  legally  and 
economically exploited. Estimates of mineral reserves, mineral resources, mineral deposits and production costs can 
also be affected by such factors as environmental permitting regulations and requirements, weather, environmental 
factors, unforeseen technical difficulties, the metallurgy of the mineralization forming the mineral deposit, unusual 
or  unexpected  geological  formations  and  work  interruptions.  If  current  exploration  programs  do  not  result  in  the 
discovery of commercial ore, we may need to write-off part or all of our investment in our existing exploration stage 
properties, and may need to acquire additional properties. 

Material  changes  in  mineral  reserves,  if  any,  grades,  stripping  ratios  or  recovery  rates  may  affect  the  economic 
viability  of  any  project.  Our  future  growth  and  productivity  will  depend,  in  part,  on  our  ability  to  develop 
commercially mineable mineral rights at our existing properties or identify and acquire other commercially mineable 
mineral rights, and on the costs and results of continued exploration and potential development programs. Mineral 
exploration is highly speculative in nature and is frequently non-productive. Substantial expenditures are required to: 

• 

• 

• 

establish mineral reserves through drilling and metallurgical and other testing techniques; 

determine metal content and metallurgical recovery processes to extract metal from the ore; and 

construct, renovate or expand mining and processing facilities. 

In addition, if we discover ore, it would take several years from the initial phases of exploration until production is 
possible.  During  this  time,  the  economic  feasibility  of  production  may  change.  As  a  result  of  these  uncertainties, 
there can be no assurance that we will successfully acquire commercially mineable (or viable) mineral rights. 

We are subject to significant governmental regulations. 

Our exploration activities are subject to extensive federal, state, provincial and local laws and regulations governing 
various matters, including: 

• 

• 

• 

• 

• 

• 

• 

environmental protection; 

the management and use of toxic substances and explosives; 

the management of natural resources; 

the exploration and development of mineral properties, including reclamation; 

exports; 

price controls; 

taxation and mining royalties; 

•  management of tailing and other waste generated by operations; 

• 

• 

labor standards and occupational health and safety, including mine safety; and 

historic and cultural preservation. 

24 

 
 
Failure  to  comply  with  applicable  laws  and  regulations  may  result  in  civil  or  criminal  fines  or  penalties  or 
enforcement  actions,  including  orders  issued  by  regulatory  or  judicial  authorities  enjoining,  curtailing  or  closing 
operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which 
could  result  in  significant  expenditures.  We  may  also  be  required  to  compensate  private  parties  suffering  loss  or 
damage  by  reason  of  a  breach  of  such  laws,  regulations  or  permitting  requirements.  It  is  also  possible  that  future 
laws  and  regulations,  or  more  stringent  enforcement  of  current  laws  and  regulations  by  governmental  authorities, 
could cause us to incur additional expense or capital expenditure restrictions, suspensions or closing of our activities 
and delays in the exploration and development of our properties. 

We  require  further  permits  in  order  to  conduct  current  and  anticipated  future  operations,  and  delays  in 
obtaining or failure to obtain such permits, or a failure to comply with the terms of any such permits that we 
have obtained, would adversely affect our business. 

Our  current  and  anticipated  future  operations,  including  further  exploration,  development  and  commencement  of 
production on our mineral properties, require permits from various governmental authorities. Obtaining or renewing 
governmental permits is a complex and time-consuming process. The duration and success of efforts to obtain and 
renew permits are contingent upon many variables not within our control. Due to the preliminary stages of the Upper 
Kobuk Mineral Projects, it is difficult to assess what specific permitting requirements will ultimately apply. 

Shortage  of  qualified  and  experienced  personnel  in  the  U.S.  federal  and  Alaskan  State  agencies  to  coordinate  a 
federally led joint environmental impact statement process could result in delays or inefficiencies. Backlog within 
the  permitting  agencies  could  affect  the  permitting  timeline  or  potential  of  the  Upper  Kobuk  Mineral  Projects,  as 
may  negative public perception of  mining projects in general due to circumstances unrelated to the Company and 
outside of its control. Other factors that could affect the permitting timeline include (i) the number of other large-
scale projects currently in a more advanced stage of development which could slow down the review process for the 
Upper Kobuk Mineral Projects and (ii) significant public response regarding the Upper Kobuk Mineral Projects.   

We cannot provide assurance that all permits that we require for our operations, including any for construction of 
mining facilities or conduct of mining, will be obtainable or renewable on reasonable terms, or at all. Delays or a 
failure  to  obtain  such  required  permits,  or  the  expiry,  revocation  or  failure  to  comply  with  the  terms  of  any  such 
permits that we have obtained, would adversely affect our business. 

Our activities are subject to environmental laws and regulations that may increase our costs and restrict our 
operations. 

All  of  our  exploration,  potential  development  and  production  activities  are  subject  to  regulation  by  governmental 
agencies  under  various  environmental  laws.  These  laws  address  emissions  into  the  air,  discharges  into  water, 
management  of  waste,  management  of  hazardous  substances,  protection  of  natural  resources,  antiquities  and 
endangered species and reclamation of lands disturbed by mining operations. Environmental legislation is evolving 
and  the  general  trend  has  been  towards  stricter  standards  and  enforcement,  increased  fines  and  penalties  for 
noncompliance,  more  stringent  environmental  assessments  of  proposed  projects  and  increasing  responsibility  for 
companies  and  their  officers,  directors  and  employees.  Compliance  with  environmental  laws  and  regulations  may 
require significant capital outlays on our behalf and may cause material changes or delays in our intended activities.  

Several regulatory initiatives are currently ongoing within the State of Alaska that have the potential to influence the 
permitting  process  for  the  Upper  Kobuk  Mineral  Projects.    These  include  revisions  to  Alaska's  Water  Quality 
Standards regarding mixing zones regulations, which are currently under EPA review, and which revisions may be 
required  in  order  to  authorize  a  mixing  zone  for  discharge  in  Subarctic  Creek.  Future  changes  in  these  laws  or 
regulations  could  have  a  significant  adverse  impact  on  some  portion  of  our  business,  requiring  us  to  re-evaluate 
those activities at that time.   

Environmental hazards may exist on our properties that are unknown to us at the present time and that have been 
caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such 
damage.  

Failure  to  comply  with  applicable  environmental  laws,  regulations  and  permitting  requirements  may  result  in 
enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to 
cease  or  to  be  curtailed,  and  may  include  corrective  measures  requiring  capital  expenditures,  installation  of 
additional equipment or remedial actions. 

25 

 
 
Land reclamation requirements for our exploration properties may be burdensome. 

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with 
mining  operations)  in  order  to  minimize  long  term  effects  of  land  disturbance.  Reclamation  may  include 
requirements to: 

• 

• 

• 

treat ground and surface water to drinking water standards; 

control dispersion of potentially deleterious effluents; and 

reasonably re-establish pre-disturbance land forms and vegetation. 

In order to carry out reclamation obligations imposed on us in connection with exploration, potential development 
and production activities, we must allocate financial resources that might otherwise be spent on further exploration 
and development programs. In addition, regulatory changes could increase our obligations to perform reclamation 
and mine closing activities.  If we are required to carry out unanticipated reclamation work, our financial position 
could be adversely affected. 

Title and other rights to our properties may be subject to challenge. 

We  cannot  provide  assurance  that  title  to  our  properties  will  not  be  challenged.  We  own  mineral  claims  which 
constitute  our  property  holdings.  We  may  not  have,  or  may  not  be  able  to  obtain,  all  necessary  surface  rights  to 
develop a property. Title insurance is generally not available for mineral properties and our ability to ensure that we 
have obtained a secure claim to individual mining properties may be severely constrained. Our mineral properties 
may  be  subject  to  prior  unregistered  agreements,  transfers  or  claims,  and  title  may  be  affected  by,  among  other 
things, undetected defects. We have not conducted surveys of all of the claims in which we hold direct or indirect 
interests.  A  successful  claim  contesting  our  title  to  a  property  will  cause  us  to  lose  our  rights  to  explore  and,  if 
warranted,  develop  that  property  or  undertake  or  continue  production  thereon.  This  could  result  in  our  not  being 
compensated for our prior expenditures relating to the property. In addition, our ability to continue to explore and 
develop  the  property  may  be  subject  to  agreements  with  other  third  parties  including  agreements  with  native 
corporations and first nations groups, for instance, the lands at the Upper Kobuk Mineral Projects are subject to the 
NANA  Agreement  (as  more  particularly  described  under  “History  of  Trilogy  –  Agreement  with  NANA  Regional 
Corporation”). 

Risks inherent in acquisitions of new properties. 

We  may  actively  pursue  the  acquisition  of  exploration,  development  and  production  assets  consistent  with  our 
acquisition and growth strategy. From time to time, we may also acquire securities of or other interests in companies 
with respect to which we may enter into acquisitions or other transactions. Acquisition transactions involve inherent 
risks, including but not limited to: 

• 

• 

• 

• 

• 

• 

• 

• 

accurately  assessing  the  value,  strengths,  weaknesses,  contingent  and  other  liabilities  and  potential 
profitability of acquisition candidates; 

ability to achieve identified and anticipated operating and financial synergies; 

unanticipated costs; 

diversion of management attention from existing business; 

potential loss of our key employees or key employees of any business acquired; 

unanticipated changes in business, industry or general economic conditions that affect the assumptions 
underlying the acquisition;  

decline in the value of acquired properties, companies or securities; 

assimilating the operations of an acquired business or property in a timely and efficient manner; 

26 

 
 
•  maintaining our financial and strategic focus while integrating the acquired business or property; 

• 

• 

implementing  uniform  standards,  controls,  procedures  and  policies  at  the  acquired  business,  as 
appropriate; and  

to  the  extent  that  we  make  an  acquisition  outside  of  markets  in  which  it  has  previously  operated, 
conducting and managing operations in a new operating environment. 

Acquiring additional businesses or properties could place increased pressure on our cash flow if such acquisitions 
involve  a  cash  consideration.  The  integration  of  our  existing  operations  with  any  acquired  business  will  require 
significant  expenditures  of  time,  attention  and  funds.  Achievement  of  the  benefits  expected  from  consolidation 
would  require  us  to  incur  significant  costs  in  connection  with,  among  other  things,  implementing  financial  and 
planning systems. We may not be able to integrate the operations of a recently acquired business or restructure our 
previously  existing  business  operations  without  encountering  difficulties  and  delays.  In  addition,  this  integration 
may  require  significant  attention  from  our  management  team,  which  may  detract  attention  from  our  day-to-day 
operations. Over the short-term, difficulties associated with integration could have a material adverse effect on our 
business,  operating  results,  financial  condition  and  the  price  of  Trilogy  Shares.  In  addition,  the  acquisition  of 
mineral properties may subject us to unforeseen liabilities, including environmental liabilities, which could have a 
material adverse effect on us. There can be no assurance that any future acquisitions will be successfully integrated 
into our existing operations.  

Any one or more of these factors or other risks could cause us not to realize the anticipated benefits of an acquisition 
of properties or companies, and could have a material adverse effect on our financial condition. 

High metal prices in past years have encouraged increased mining exploration, development and construction 
activity, which has increased demand for, and cost of, exploration, development and construction services and 
equipment. 

The relative strength of metal prices in past years has encouraged increases in mining exploration, development and 
construction  activities  around  the  world,  which  has  resulted  in  increased  demand  for,  and  cost  of,  exploration, 
development and construction services and equipment. While recent market conditions have had a moderating effect 
on the costs of such services and equipment, increases in such costs may continue with the resumption of an upward 
trend in metal prices. Increased demand for and cost of services and equipment could result in delays if services or 
equipment  cannot  be  obtained  in  a  timely  manner  due  to  inadequate  availability,  and  may  cause  scheduling 
difficulties  due  to  the  need  to  coordinate  the  availability  of  services  or  equipment,  any  of  which  could  materially 
increase project exploration, development and/or construction costs. 

We face industry competition in the acquisition of exploration properties and the recruitment and retention 
of qualified personnel. 

We  compete  with  other  exploration  and  producing  companies,  many  of  which  are  better  capitalized,  have  greater 
financial resources, operational experience and technical capabilities or are further advanced in their development or 
are significantly larger and have access to greater mineral reserves, for the acquisition of mineral claims, leases and 
other mineral interests as well as for the recruitment and retention of qualified employees and other personnel. If we 
require  and  are  unsuccessful  in  acquiring  additional  mineral  properties  or  in  recruiting  and  retaining  qualified 
personnel, we will not be able to grow at the rate we desire, or at all. 

We may experience difficulty attracting and retaining qualified management and technical personnel to grow 
our business. 

We are dependent on the services of key executives and other highly skilled and experienced personnel to advance 
our  corporate  objectives  as  well  as  the  identification  of  new  opportunities  for  growth  and  funding.    Mr.  Van 
Nieuwenhuyse  and  Ms.  Sanders  are  currently  our  only  executive  officers.  It  will  be  necessary  for  us  to  recruit 
additional  skilled  and  experienced  executives.  Our  inability  to  do  so,  or  the  loss  of  any  of  these  persons  or  our 
inability to attract and retain suitable replacements for them, or additional highly skilled employees required for our 
activities, would have a material adverse effect on our business and financial condition.  

27 

 
 
Some of our directors and officers have conflicts of interest as a result of their involvement with other natural 
resource companies. 

Certain of our directors and  officers also serve as directors or officers, or have  significant shareholdings, in other 
companies  involved  in  natural  resource  exploration  and  development  or  mining-related  activities,  including,  in 
particular,  NovaGold.    To  the  extent  that  such  other  companies  may  participate  in  ventures  in  which  we  may 
participate in, or in ventures which we may seek to participate in, our directors and officers may have a conflict of 
interest  in  negotiating  and  concluding  terms  respecting  the  extent  of  such  participation.  In  all  cases  where  our 
directors and officers have an interest in other companies, such other companies may also compete with us for the 
acquisition  of  mineral  property  investments.  Any  decision  made  by  any  of  these  directors  and  officers  involving 
Trilogy will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to 
the best interests of Trilogy and its shareholders. In addition, each of the directors is required to declare and refrain 
from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures 
set forth in the Business  Corporations Act (British Columbia) and other applicable laws. In appropriate cases, the 
Company will establish a special committee of independent directors to review a matter in which several directors, 
or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not 
have  an  opportunity  to  participate  in  certain  transactions,  which  may  have  a  material  adverse  effect  on  the 
Company’s business, financial condition, results of operation and prospects.  

In the future, we may be subject to legal proceedings. 

Due to the  nature of our business,  we  may be subject to numerous regulatory investigations, claims,  lawsuits and 
other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted 
with  certainty  due  to  the  uncertainty  inherent  in  litigation,  including  the  effects  of  discovery  of  new  evidence  or 
advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that 
decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse 
effect on our business.  

Our largest shareholder has significant influence on us and may also affect the market price and liquidity of 
the securities. 

Electrum Strategic Opportunities Fund L.P. (“Electrum”) is our single largest shareholder, controlling approximately 
21.3% of the outstanding voting securities.  Accordingly, Electrum will have significant influence in determining the 
outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, 
consolidations  and  the  sale  of  all  or  substantially  all  of  our  assets  and  other  significant  corporate  actions.  Unless 
significant  participation  of  other  shareholders  takes  place  in  such  shareholder  meetings,  Electrum  may  be  able  to 
approve  such  matters  itself.  The  concentration  of  ownership  of  the  shares  by  Electrum  may:  (i)  delay  or  deter  a 
change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their shares 
as part of a sale of the Company; and (iii) affect the market price and liquidity of the shares. Without the consent of 
Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of 
Electrum  may  differ  from  or  be  adverse  to  the  interests  of  our  other  shareholders.  The  effect  of  these  rights  and 
Electrum’s  influence  may  impact  the  price  that  investors  are  willing  to  pay  for  securities.  If  Electrum  sells  a 
substantial number of shares in the public market, the market price of the shares could fall. The perception among 
the public that these sales will occur could also contribute to a decline in the market price of the shares.  

Global climate change is an international concern, and could impact our ability to conduct future operations. 

Global climate change is an international issue and receives an enormous amount of publicity. We would expect that 
the  imposition  of  international  treaties  or  U.S.  or  Canadian  federal,  state,  provincial  or  local  laws  or  regulations 
pertaining  to  mandatory  reductions  in  energy  consumption  or  emissions  of  greenhouse  gasses  could  affect  the 
feasibility of our mining projects and increase our operating costs. 

Adverse publicity from non-governmental organizations could have a material adverse effect on us. 

There  is  an  increasing  level  of  public  concern  relating  to  the  effect  of  mining  production  on  our  surroundings, 
communities  and  environment.  Non-governmental  organizations  (“NGOs”),  some  of  which  oppose  resource 
development,  are  often  vocal  critics  of  the  mining  industry.  While  we  seek  to  operate  in  a  socially  responsible 
manner, adverse publicity  generated by such NGOs related to extractive  industries, or our operations specifically, 

28 

 
 
could have an adverse effect on our reputation and financial condition or our relationship with the communities in 
which we operate. 

We may fail to achieve and maintain the adequacy of our internal control over financial reporting as per the 
requirements of the Sarbanes-Oxley Act. 

We are required to document and test our internal control procedures in order to satisfy the requirements of Section 
404  of  SOX.  It  requires  an  annual  assessment  by  management  of  the  effectiveness  of  our  internal  control  over 
financial  reporting.  We  may  in  the  future  fail  to  achieve  and  maintain  the  adequacy  of  our  internal  control  over 
financial reporting, as such standards are modified, supplemented or amended from time to time, and we may not be 
able  to  ensure  that  we  can  conclude  on  an  ongoing  basis  that  we  have  effective  internal  control  over  financial 
reporting in accordance with Section 404 of SOX. Our failure to satisfy the requirements of Section 404 of SOX on 
an ongoing, timely basis could result in the loss of investor confidence in the reliability of our financial statements, 
which in turn could harm our business and negatively impact the trading price of our Common Shares. In addition, 
any  failure  to  implement  required  new  or  improved  controls,  or  difficulties  encountered  in  their  implementation, 
could  harm  our  operating  results  or  cause  us  to  fail  to  meet  our  reporting  obligations.  Future  acquisitions  of 
companies may provide us with challenges in implementing the required processes, procedures and controls in our 
acquired operations. Acquired companies  may  not have disclosure control and procedures or internal control over 
financial reporting that are as thorough or effective as those required by securities laws currently applicable to us. 

Our  business  is  subject  to  evolving  corporate  governance  and  public  disclosure  regulations  that  have 
increased  both our compliance costs and the risk of  noncompliance, which could have an adverse effect on 
our stock price.  

We  are  subject  to  changing  rules  and  regulations  promulgated  by  a  number  of  United  States  and  Canadian 
governmental  and  self-regulated  organizations,  including  the  SEC,  the  Canadian  Securities  Administrators,  the 
NYSE-MKT,  the  TSX,  and  the  Financial  Accounting  Standards  Board.  These  rules  and  regulations  continue  to 
evolve in scope and complexity and many new requirements have been created in response to laws enacted by the 
United States Congress, making compliance more difficult and uncertain. Our efforts to comply with new rules and 
regulations, including those promulgated under Dodd-Frank, have resulted in, and are likely to continue to result in, 
increased  general  and  administrative  expenses  and  a  diversion  of  management  time  and  attention  from  revenue-
generating activities to compliance activities. 

Our Common Shares are subject to various factors that have historically made share prices volatile. 

The  market  price  of  our  Common  Shares  may  be  subject  to  large  fluctuations,  which  may  result  in  losses  to 
investors. The market price of the Common Shares may increase or decrease in response to a number of events and 
factors,  including:  our  operating  performance  and  the  performance  of  competitors  and  other  similar  companies; 
volatility in metal prices; the arrival or departure of key personnel; the number of Common Shares to be publicly 
traded  after  an  offering;  the  public’s  reaction  to  our  press  releases,  material  change  reports,  other  public 
announcements  and  our  filings  with  the  various  securities  regulatory  authorities;  changes  in  earnings  estimates  or 
recommendations  by  research  analysts  who  track  the  Common  Shares  or  the  shares  of  other  companies  in  the 
resource  sector;  changes  in  general  economic  and/or  political  conditions;  acquisitions,  strategic  alliances  or  joint 
ventures involving us or our competitors; and the factors listed under the heading “Cautionary Statement Regarding 
Forward-Looking Information.” 

The market price of the Common Shares may be affected by many other variables which are not directly related to 
our  success  and  are,  therefore,  not  within  our  control,  including  other  developments  that  affect  the  market  for  all 
resource  sector  securities,  the  breadth  of  the  public  market  for  the  Common  Shares  and  the  attractiveness  of 
alternative investments. 

We do not intend to pay any cash dividends in the foreseeable future. 

We have not declared or paid any dividends on our Common Shares.  Our current business plan requires that for the 
foreseeable future, any future earnings be reinvested to finance the growth and development of our business.  We do 
not intend to pay cash dividends on the Common Shares in the foreseeable future. We will not declare or pay any 
dividends  until  such  time  as  our  cash  flow  exceeds  our  capital  requirements  and  will  depend  upon,  among  other 
things,  conditions  then  existing  including  earnings,  financial  condition,  restrictions  in  financing  arrangements, 

29 

 
 
business opportunities and conditions and other factors, or our Board determines that our shareholders could make 
better use of the cash. 

We may be a “passive foreign investment company” in future periods, which may have adverse U.S. federal 
income tax consequences for U.S. shareholders. 

U.S. investors in the Company should be aware that we believe we were not a passive foreign investment company 
(“PFIC”) for the years ending November 30, 2014, 2015 and 2016 but may be a PFIC in future tax years. If we are a 
PFIC for any year during a U.S. Holder’s (as defined below under Certain U.S. Federal Income Tax Considerations 
– U.S. Holders”) holding period, then such U.S. Holder generally will be required to treat any gain realized upon a 
disposition of Common Shares and any so-called “excess distribution” received on its Common Shares as ordinary 
income,  and  to  pay  an  interest  charge  on  a  portion  of  such  gain  or  distributions,  unless  the  shareholder  makes  a 
timely and effective  “QEF Election” or a  “Mark-to-Market Election” (each as defined below  under “Certain U.S. 
Federal Income Tax Considerations – Default PFIC Rules under Section 1291 of the Code”).  A U.S. Holder who 
makes a QEF Election generally must report on a current basis its share of our net capital gain and ordinary earnings 
for any year in which we are a PFIC, whether or not we distribute any amounts to our shareholders.  A U.S. Holder 
who makes the Mark-to-Market Election generally must include as ordinary income each year the excess of the fair 
market  value  of  the  Common  Shares  over  the  U.S.  Holder’s  tax  basis  therein.    This  paragraph  is  qualified  in  its 
entirety  by  the  discussion  below  the  heading  “Certain  U.S.  Federal  Income  Tax  Considerations.”  Each  U.S. 
shareholder  should  consult  its  own  tax  advisor  regarding  the  PFIC  rules  and  the  U.S.  federal  income  tax 
consequences of the acquisition, ownership, and disposition of Common Shares.  

Item 1B.  UNRESOLVED STAFF COMMENTS 

None.  

Item 2.  PROPERTIES 

The  following  descriptions  summarize  selected  information  about  our  Upper  Kobuk  Mineral  Projects,  which  are 
located in the  Ambler  mining district of  Alaska and include the  Arctic Project and the Bornite Project. All of the 
UKMP Projects are without known reserves, as defined under SEC Industry Guide 7, and all proposed programs for 
the properties are exploratory in nature. 

Arctic Project, Ambler Mining District, Alaska 

Arctic Project – Technical Report 

Except with respect to the land size disclosure and the disclosure regarding the number of claims (which were both 
increased  subsequent  to  the  effective  date  of  the  PEA),  and  the  information  under  the  heading  “Arctic  Project  – 
Current  Activities”,  or  as  otherwise  stated,  the  scientific  and  technical  information  relating  to  the  Arctic  Project 
contained  in  this  Form  10-K  is  derived  from,  and  in  some  instances  is  an  extract  from,  the  technical  report  titled 
“Preliminary Economic Assessment Report on the Arctic Project, Ambler Mining District, Northwest Alaska” dated 
effective  September  12,  2013  prepared  by  Tetra Tech  and  EBA,  a  Tetra Tech  Company  (and  together  with  Tetra 
Tech, “Tetra Tech”).  Erin Workman, P.Geo., an employee and Director, Technical Services, is a Qualified Person 
as  defined  in  NI  43-101,  and  has  approved  the  scientific  and  technical  information  contained  herein.    The 
information regarding the Arctic Project is based on assumptions, qualifications and procedures which are not fully 
described herein.  Reference should be made to the full text of the PEA which has been filed with certain Canadian 
securities regulatory authorities pursuant to NI 43-101 and is available for review on SEDAR at www.sedar.com and 
on EDGAR at www.sec.gov. 

Arctic Project - Property Description and Location 

The Arctic Project is located in the Ambler mining district of the southern Brooks Range, in the Northwest Arctic 
Borough (“NWAB”) of Alaska. The Arctic Project is located 260 km east of the town of Kotzebue, 30 km north of 
the  village  of  Kobuk,  260 km  west  of  the  Dalton  Highway,  an  all-weather  state  maintained  public  road,  at 
geographic  coordinates  N67.17°  latitude  and  W156.38°  longitude  (Universal  Transverse  Mercator  (UTM)  North 
American  Datum  (NAD)  83,  Zone  4  coordinates  7453080N,  613110E).    The  current  size  of  the  Ambler  lands  is 
approximately 75 km long x 6 km wide and comprises a total of 45,348 ha. 

30 

 
 
 
The Ambler lands comprise 45,348 ha of State of Alaska mining claims and US Federal patented mining claims in 
the Kotzebue Recording District.  The Ambler land tenure consists of 1,358 contiguous claims, including 870 40-
acre State claims, 481 160-acre State claims, 5 State claims ranging from 2-acre to 8-acre, and two Federal patented 
claims comprising 110 ha held in the name of NovaCopper US Inc. The Arctic Project is located near the southern 
edge  of  the  centre  of  the  claim  block.    The  Federal  patented  claim  corners  were  located  by  the  US  Geological 
Survey.  There is no expiration date or labor requirement on the Federal patented claims.  Rent for each State claim 
is paid annually to the Alaska Department of Natural Resources (“ADNR”). An Annual Labor Statement must be 
submitted annually to maintain the State claims in good standing. 

In 1971, the US Congress passed the Alaska Native Claims Settlement Act which settled land and financial claims 
made  by  the  Alaska  Natives  and  provided  for  the  establishment  of  13  regional  corporations  to  administer  those 
claims.    These  are  known  as  the  Alaska  Native  Regional  Corporations.    One  of  these  13  regional  corporations  is 
NANA.  ANCSA Lands controlled by NANA bound the southern border of the property claim block.  National Park 
lands are within 25 km of the northern property border. 

Figure 1: Regional Location Map 

31 

 
 
 
Figure 2:  Upper Kobuk Mineral Projects Lands Prospect Location Map 

There are no known environmental liabilities due to previous operators or from our ongoing exploration activities at 
the Arctic Project.  There has been no mine development or production on the Ambler lands.   

Multiple permits are required during the exploration phase of the Arctic Project.  Permits are issued from Federal, 
State,  and  Regional  agencies,  including:  the  Environmental  Protection  Agency  (“EPA”),  the  US  Army  Corps  of 
Engineers (“USACE”), the Alaska Department of Environmental Conservation (“ADEC”), the Alaska Department 
of  Fish  and  Game  (“ADF&G”),  the  ADNR,  and  the  NWAB.    The  State  of  Alaska  permit  for  exploration  on  the 
Arctic  Project,  the  Annual  Hardrock  Exploration  Activity  (“AHEA”)  Permit,  is  obtained  and  renewed  every  five 
years  through  the  ADNR  –  Division  of  Mining,  Land  and  Water.    Trilogy  holds  an  AHEA  exploration  permit  in 
good standing with the Alaska DNR.  The Arctic Project is within the NWAB thus requiring a Title 9 Miscellaneous 
Land Use permit for mineral exploration, fuel storage, gravel extraction, and the operation of a landfill.  NovaGold 
held  these  permits  in  good  standing  during  the  2004  to  2008  seasons  and  renewed  the  permits  for  the  2010 
exploration  season  to  2015.    The  Bornite  Camp,  Bornite  Landfill,  and  Dahl  Creek  Camp  are  permitted  by  the 
ADEC. 

A number of statutory reports and payments are required to maintain the claims in good standing on an annual basis.  
As the Arctic Project progresses, additional permits for environmental baseline and detailed engineering studies will 
be necessary at federal, state, and local levels.   

Arctic Project - Accessibility, Climate, Local Resources, Infrastructure and Physiography 

Accessibility  is  one  of  the  most  significant  challenges  of  developing  the  Arctic  Project.    There  is  no  developed 
surface access to the Ambler mining district.   

Primary  access  to  the  Arctic  Project  is  by  air,  using  both  fixed  wing  aircraft  and  helicopters.  There  are  four  well 
maintained, approximately 1,500 m-long gravel airstrips located near the Arctic Project, capable of accommodating 
charter fixed wing aircraft.  These airstrips are located 66 km west at Ambler, 46 km southwest at Shungnak, 36 km 

32 

 
 
 
southwest at Kobuk, and 32 km southwest at Dahl Creek. There is daily commercial air service from Kotzebue to 
the village of Kobuk, the closest community to the Arctic Project. During the summer months, the Dahl Creek Camp 
airstrip is suitable for larger aircraft, such as C-130 and DC-6. In addition to the four 1,500 m airstrips, there is a 
700 m  airstrip  located  at  the  Bornite  Camp,  approximately  25 km  southwest  of  the  Arctic  Deposit,  and  a  400 m 
airstrip  located  approximately  10 km  southwest  of  the  Arctic  Deposit.  The  airstrip  at  Bornite  is  suited  to  smaller 
aircraft,  which  support  the  camp  with  personnel  and  supplies.  An  upgraded  one-lane  gravel  road  suitable  for 
vehicles  or  construction  equipment  links  the  Bornite  Camp  to  the  Dahl  Creek  airstrip  and  camp  southwest  of  the 
Arctic Deposit.   

The climate in the region is typical of a sub-arctic environment. Exploration is generally conducted from late May 
until  late  September.  Weather  conditions  on  the  Ambler  lands  can  vary  significantly  from  year  to  year  and  can 
change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, 
while average lows range from -2°C to 7°C.  By early October, unpredictable weather limits regular helicopter travel 
to the Arctic Project. During winter months, the Arctic Project can be accessed by snow machine, track vehicle, or 
fixed wing aircraft.  Winter temperatures are routinely below -25°C and can exceed -50°C. Annual precipitation in 
the region averages at 395 mm with the most rainfall occurring from June through September, and the most snowfall 
occurring from November through January. 

The Arctic Project is located along the south slope of the Brooks Range, which separates the Arctic region from the 
interior of Alaska. Nearby surface waters include Subarctic Creek, the Shungnak and Kogoluktuk Rivers, the Kobuk 
River, and numerous small lakes. The Arctic Project is located at the eastern end of Subarctic Creek, a tributary of 
the  Shungnak  River  to  the  west,  along  a  ridge  between  Subarctic  Creek  and  the  Kogoluktuk  River  Valley.  The 
property  area  is  marked  by  steep  and  rugged  terrain  with  high  topographic  relief.  Elevations  range  from  30 masl 
along the Kobuk River to 1,180 masl on a peak immediately north of the Arctic Project area. The divide between the 
Shungnak and Kogoluktuk Rivers in the Ambler Lowlands is approximately 220 masl. The Kobuk Valley is located 
at  the  transition  between  boreal  forest  and  Arctic  tundra.    Spruce,  birch,  and  poplar  are  found  in  portions  of  the 
valley, with a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow 
drainages,  and  alpine  tundra  is  found  at  higher  elevations.  Tussock  tundra  and  low,  heath-type  vegetation  covers 
most of the valley floor.  Intermittent permafrost exists on the Arctic Project. 

Wildlife in the area includes caribou, moose, Dall sheep, bears (grizzly and black), wolves, wolverines, coyotes, and 
foxes. Fish species include salmon, sheefish, arctic char, and arctic grayling. The Kobuk River, which briefly enters 
the UKMP lands on its southwest corner, is a significant salmon spawning river. Subarctic Creek, which does not 
contain anadromous fish, drains into the  Shungnak River, which drains into the  Kobuk  River. The caribou on the 
property belong to the Western Arctic herd that migrates twice a year – south in August, from their summer range 
north of the Brooks Range, and north in March from their winter range along the Buckland River. 

Currently, the Arctic Project does not have access to Alaska power and transportation infrastructure. Beginning in 
2009, the Arctic Project has been the focus of the Ambler Mining District Access Corridor study.  

The Arctic Deposit proposed access road branches off from the proposed AMDIAP, formerly known as the Ambler 
Mining District Access Road or AMDIAR, and ends at the Arctic Deposit.  Figure 3 shows the overall road location 
plan showing the relationship of the proposed access road to the proposed Brooks East  corridor  which eventually 
connects  to  the  existing  Dalton  Highway  320 km  from  the  access  road  intersection.  The  proposed  access  road  is 
17 km long from the AMDIAP corridor to the Arctic Project site.   

33 

 
 
Figure 3: Proposed Access to the Arctic Project Site 

AMDIAR
Proposed On Site Road
Proposed Bridge
Proposed Culvert

Kilometres

0

1

2

3

4

N

15 km

17 km

Proposed Arctic Pit Shell

e r

k   R i v

a

n

g

n

u

h

S

10 km

Proposed Arctic Airstrip

5 km

0 km

K o g olu ktu k Riv er

AMDIAR

NOTES

CLIENT

The  proposed  Arctic  Project  mine  site  infrastructure  is  spread  over  a  distance  of  approximately  6  km  within  the 
upper  reaches  of  the  Sub-Arctic  Creek  Valley.  The  proposed  development  for  the  Arctic  Project  consists  of  the 
following  major  infrastructure:  roads  and  an  airstrip,  mill  buildings  and  related  services  facilities  including 
maintenance  and  truck  shops,  assay  lab,  water  supply  and  distribution,  waste management,  fuel  storage,  on  site 
explosive  storage,  power  supply,  tailings  storage  facility  (“TSF”)  and  water  management,  water  treatment  plant, 
construction and permanent camp accommodation, waste rock storage facilities, and communication infrastructure. 

The proposed  mine-site infrastructure has been located to  take advantage of local topography,  minimize pumping 
requirements  from  the  mill  building  to  the  TSF,  minimize  environmental  impacts  to  Sub-Arctic  Creek,  minimize 
snow  avalanche  mitigation  requirements,  and  to  reduce  the  haul  distance  from  the  pit  to  the  primary  crusher  and 
TSF. 

The  proposed  location  for  an  airstrip  sufficient  to  support project  activities  is  located  in  the  valley  approximately 
21 km from the Arctic Project site.  Geotechnical data is not available for the site but it is assumed that the facility 
will require permafrost protection to ensure  year round operations. The proposed airstrip  will operate as a private 
aerodrome  and  prior  permission  will  be  required  for  all  aircraft  utilizing  the  site.  The  gravel  airstrip  will  be 
approximately 1,524 meters long and capable of landing a Dash 8 – Q400/Hercules C130. 

The Arctic Project will require power of 15 MW of peak load for 10,000 t/d operation demand. It is proposed that 
power will be generated by five self-contained 3.6 MW prime diesel generators. Four units will be in service with 
the fifth unit reserved for maintenance. Heat will be recovered from the generators and used to heat the mill, camp 
and related facilities. 

Arctic Project - History 

During the 1940’s and 1950’s Bear Creek Mining Corporation (“BCMC”), an exploration subsidiary of Kennecott, 
conducted  regional  reconnaissance  exploration  in  the  Cosmos  Hills  and  the  southern  Brooks  Range.  Stream  silt 
sampling in 1963 by BCMC revealed a significant copper anomaly in Arctic Creek roughly 17 km northeast of the 
previously identified Bornite deposit. The area was subsequently staked and, in 1967, eight core holes were drilled 
at the  Arctic Deposit  yielding impressive  massive sulphide intercepts over an almost 500-m strike length. BCMC 
conducted  intensive  exploration  on  the  property  until  1977  and  then  intermittently  through  1998.  No  drilling  or 
additional exploration was conducted on the Arctic Project between 1998 and 2004. 

34 

 
 
 
Arctic Project - Historical Metallurgical Testwork 

Metallurgical  studies  during  the  Kennecott  era  included:  two  initial  mineralogical  studies  undertaken  by  the 
Kennecott Research Center (“KRC”) to evaluate and identify the potential beneficiation or metallurgical treatment 
of  concentrates  of  the  samples  from  the  deposit  and  a  subsequent  1999  Lakefield  Research  Ltd.  (Lakefield) 
metallurgical  test  program  to  confirm  and  improve  upon  the  results  from  the  1970s  KRC  test  work  program.    In 
2012, Trilogy contracted SGS to conduct an extensive metallurgical program in support of the Artic PEA, the results 
of which are described and summarized below under the heading “Arctic Project – Metallurgical Testing”. 

Arctic Project - Historical Geophysics 

Prior to 1998, Kennecott conducted a series of geophysical surveys which are poorly documented or are unavailable 
to Trilogy.  In March 1998, Kennecott initiated an extensive helicopter-supported airborne electromagnetic (“EM”) 
and  magnetic  survey  covering  the  entire  VMS  belt,  including  the  Arctic  Deposit.  Kennecott  identified  eight  EM 
anomalies  which  were  deemed  to  have  significant  potential  for  mineralization  and  followed-up  with  additional 
gravity  lines  and/or  Controlled  Source  Audio-frequency  Magneto-Telluric  (“CSAMT”)  lines  during  1998. 
Kennecott conducted no further geophysical field exploration in the district after 1998.   

Arctic Project - Historical Drilling 

Between  1967  and  July  1985,  Kennecott  (BCMC)  completed  86  holes  (including  14  large  diameter  metallurgical 
test holes) totalling 16,080 m. In 1998, Kennecott drilled an additional 6 core holes totalling 1,492 m to test for: 1) 
extensions  of  the  known  Arctic  resource;  2)  grade  and  thickness  continuity  at  Arctic;  and  3)  a  nearby  airborne 
geophysical anomaly. Drilling for all BCMC/Kennecott campaigns in the Arctic Deposit area (1966 to 1998) totals 
92 core holes for a combined 17,572 m.   

No drilling was performed on the project between 1999 and 2003.  NovaGold took control of the project in 2004.   

Arctic Project - Historical Geochemistry 

Historic geochemistry  for the district, compiled in the 1998 Kennecott database, includes 2,255 soil samples, 922 
stream  silt  samples,  363  rock  samples,  and  37  panned  concentrate  samples.  Data  has  been  sourced  from  several 
companies including Kennecott, Sunshine Mining, Resource Associates of Alaska, and NANA. Sourcing of much of 
the data had been poorly documented in the database. During 1998, Kennecott renewed its effort in the district, and, 
as a follow-up to the 1998 EM survey, undertook directed soil and rock chip sampling in and around EM anomalies 
generated in the geophysical targeting effort. During this period Kennecott collected 962 soils and 107 rocks and for 
the first time used extensive multi-element inductively coupled plasma (“ICP”) analysis. 

Arctic Project - Geologic Setting 

Regional Geology 

The Ambler mining district occurs along the southern margin of Brooks Range within an east-west trending zone of 
Devonian to Jurassic age submarine volcanic and sedimentary rocks. The district covers both: 1) VMS-like deposits 
and  prospects  hosted  in  the  Devonian  age  Ambler  Sequence  (or  Ambler  Schist  belt),  a  group  of  metamorphosed 
bimodal  volcanic  rocks  with  interbedded  tuffaceous,  graphitic  and  calcareous  volcaniclastic  metasediments;  and 
2) epigenetic  carbonate-hosted  copper  deposits  occurring  in  Devonian  age  carbonate  and  phyllitic  rocks  of  the 
Bornite  Carbonate  Sequence.  The  Ambler  Sequence  occurs  in  the  upper  part  of  the  Anirak  Schist,  the  thickest 
member  of  the  Schist  belt  or  Coldfoot  subterrane.  VMS-like  stratabound  mineralization  can  be  found  along  the 
entire  110 km  strike  length  of  the  district.  Immediately  south  of  the  Schist  belt  in  the  Cosmos  Hills,  a  time 
equivalent  section  of  the  Anirak  Schist  includes  the  approximately  1  km  thick  Bornite  Carbonate  Sequence.  
Mineralization  of  both  the  VMS-like  deposits  of  the  Schist  belt  and  the  carbonate-hosted  deposits  of  the  Cosmos 
Hills has been dated at 375 to 387 Ma. 

In addition, the Ambler mining district is characterized by increasing metamorphic grade north perpendicular to the 
strike of the east-west trending units. The district shows isoclinal folding in the northern portion and thrust faulting 
to  south  (Schmidt  1983). The  Devonian  to  Mississippian  age  Angayucham  basalt  and  the Triassic  to  Jurassic  age 
mafic volcanic rocks are in low-angle over thrust contact with various units of the Ambler Schist belt and Bornite 
Carbonate Sequence along the northern edge of the Ambler Lowlands. 

35 

 
 
Local/Property Geology 

Rocks that form the Ambler Sequence consist of a lithologically diverse sequence of lower Paleozoic Devonian age 
carbonate  and  siliciclastic  strata  with  interlayered  mafic  lava  flows  and  sills  and  felsic  tuffs.  The  clastic  strata, 
derived from terrigenous continental and volcanic sources, were deposited primarily by mass-gravity flow into the 
sub-wavebase environment of an extending marginal basin. 

Though the Ambler Sequence is exposed over 110 km of strike length, descriptions and comments herein will refer 
to an area between the Kogoluktuk River on the east and the Shungnak River on the west where we have focused the 
majority of our exploration efforts over the last decade. 

The local base of the Ambler Sequence consists of variably metamorphosed carbonates historically referred to as the 
Gnurgle  Gneiss.    We  interpret  these  strata  as  calc-turbidites,  perhaps  deposited  in  a  sub-wavebase  environment 
adjacent to a carbonate bank.  Calcareous schists overlie the Gnurgle Gneiss and host sporadically distributed mafic 
sills and pillowed lavas. These fine-grained clastic strata indicate a progressively quieter depositional environment 
up section, and the presence of pillowed lavas indicates a rifting, basinal environment. 

Overlying  these  basal  carbonates  and  pillowed  basalts  is  a  section  of  predominantly  fine-grained  carbonaceous 
siliciclastic rocks which host a significant portion of the mineralization in the district including the Arctic Deposit. 
This quiescent section indicates further isolation from a terrigenous source terrain. 

The section above the Arctic Deposit host stratigraphy contains voluminous reworked silicic volcanic strata with the 
Button Schist at its base. The Button Schist is a regionally continuous and distinctive albite porphyroblastic unit that 
serves  as  an  excellent  marker  above  the  main  mineralized  stratigraphy.  The  paucity  of  volcanically  derived  strata 
below  the  Arctic  Deposit  host  section  and  abundance  above  indicates  that  the  basin  and  surrounding  hinterlands 
underwent major tectonic reorganization during deposition of the Arctic Deposit section. Greywacke sands that we 
interpret  as  channeled  high-energy  turbidites  occur  throughout  the  section  but  concentrate  high  in  the  local 
stratigraphy. 

Several  rock  units  show  substantial  change  in  thickness  and  distribution  in  the  vicinity  of  the  Arctic  Deposit  that 
may  have  resulted  from  the  basin  architecture  existing  at  the  time  of  deposition.  Between  the  Arctic  Ridge, 
geographically above the Arctic Deposit, and the Riley Ridge to the west, several significant differences have been 
documented including: 1) the Gnurgle Gneiss, which is thickest in exposures along the northern extension of Arctic 
Ridge  and  appears  to  thin  to  the  west;  2)  mafic  lavas  and  sills  which  thicken  from  east  to  west;  they  show  thick 
occurrences in upper Subarctic Creek and to the west, but are sparsely distributed to the east; 3) the quartzite section, 
which within and above the Arctic sulphide horizon does not occur in abundance east of Arctic Ridge; it is thicker 
and occurs voluminously to the west; 4) the Button Schist which thickens dramatically to the west from exposures 
on Arctic Ridge; exposures to the east are virtually nonexistent; and 5) Greywacke sands which do not exist east of 
Subarctic Creek but occur in abundance as massive, channeled accumulations to the west, centered on Riley Ridge. 

These  data  are  interpreted  by  us  to  define  a  generally  north-northwest-trending  depocentre  through  the  central 
Ambler mining district. Diamictite occurrences described below in concert with these formational changes suggest 
that the depocentre had a fault-controlled eastern margin with the basin deepening to the west. This original basin 
architecture  appears  to  have  controlled  mineralization  of  the  sulphide  systems  at  Ambler  and  Shungnak  (Dead 
Creek), concentrating fluid flow along structures on the eastern basin margin. 

In  addition  to  the  underlying  pre-deformational  structural  framework  of  the  district  suggested  by  the  stratigraphic 
thickening  of  various  facies  around  the  Arctic  Deposit,  the  Ambler  Sequence  is  deformed  by  two  penetrative 
deformational events that significantly complicate the distribution and spatial arrangement of the local stratigraphy; 
as described below.   

F1  Deformation:  the  earliest  penetrative  deformation  event  is  associated  with  greenschist  metamorphism  and  the 
development of regional schistosity. True isoclinal folds are developed and fold noses typically are thickened. The 
most notable F1 fold is the Arctic antiform that defines the upper and lower limbs of the Arctic Deposit. The fold 
closes along a north-northeast- trending fold axis roughly mimicking the trace of Subarctic Creek and opening to the 
east. Importantly, the overturned lower limb implies that the permissive stratigraphy should be repeated on a lower 
synformal  isocline  beneath  the  currently  explored  limbs  and  would  connect  with  the  permissive  mineralized 
stratigraphy to the northwest at Shungnak (Dead Creek).   

36 

 
 
F2 Deformation: the earlier F1 schistosity is in turn deformed by the F2 deformational event that resulted in the local 
development  of  an  axial  planar  cleavage.  The  deformational  event  is  well  defined  throughout  the  Schist  belt  and 
results  in  a  series  of  south  verging  open  to  moderately  overturned  folds  that  define  a  series  of  east-west  trending 
folds of similar vergence across the entire Schist belt stratigraphies. This event is likely temporarily related to the 
emplacement  of  the  Devonian  Angayucham  volcanics,  the  obducted Jurassic  ophiolites  and  Cretaceous  sediments 
over the Schist belt stratigraphies. In addition to the earlier penetrative deformation events, a series of poorly defined 
non-penetrative deformation events, likely as a consequence of Cretaceous extension, are seen as a series of warps 
or  arches  across  the  district.  The  interplay  between  the  complex  local  stratigraphy,  the  isoclinal  F1  event,  the 
overturned south verging F2 event and the series of post-penetrative deformational events makes district geological 
interpretation often extremely difficult at a local scale. 

Recent work by us defines the Arctic Deposit as two or more discrete horizons of sulphide mineralization contained 
in a complexly deformed isoclinal fold with an upright upper limb and an overturned lower limb hosting the main 
mineral resources. Nearby drilling suggests a third limb, an upright lower limb, likely occurs beneath the currently 
explored stratigraphy.   

Mineralization  occurs  as  stratiform  semi-massive  sulphide  (“SMS”)  to  massive  sulphide  (“MS”)  beds  within 
primarily  graphitic  chlorite  schists  and  fine-grained  quartz  sandstones.  The  sulphide  beds  average  four meters  in 
thickness  but  vary  from  less  than  one  meter  up  to  as  much  as  eighteen  meters  in  thickness.  The  bulk  of  the 
mineralization is within six modelled zones lying along the upper and lower limbs of the Arctic isoclinal anticline. 
All  of  the  zones  are  within  an  area  of  roughly  1 km2  with  mineralization  extending  to  a  depth  of  approximately 
250 m  below  the  surface.  Mineralization  characteristically  varies  from  MS  to  SMS.  Unlike  more  typical  VMS 
deposits,  mineralization  is  not  characterized  by  steep  metal  zonation  or  massive  pyritic  zones.  Mineralization  is 
dominantly  sheet-like  zones  of  base  metal  sulphides  with  variable  pyrite  and  only  minor  zonation  usually  on  an 
extremely small scale.  No stockworks or stringer zones in association with the mineralization have been observed. 
More importantly, the  mineralization in  general exhibits characteristics and textures common to replacement-style 
mineralization.  Mineralization  is  predominately  coarse-grained  sulphides  consisting  mainly  of  chalcopyrite, 
sphalerite, galena, tetrahedrite, arsenopyrite, pyrite and pyrrhotite. Trace amounts of electrum and enargite are also 
present. Gangue minerals associated with the mineralized horizons include quartz, barite, white mica, black chlorite, 
talc, calcite, dolomite and cymrite.   

Talc  and  magnesium  chlorite  are  the  dominant  alteration  products  associated  with  the  sulphide-bearing  horizons. 
Talc alteration grades downward and outward to mixed talc-magnesium chlorite with minor phlogopite, into zones 
of dominantly magnesium chlorite, then into mixed magnesium chlorite-phengite with outer phengite-albite zones of 
alteration. Thickness of alteration zones vary with stratigraphic interpretation, but tens of meters for the outer zones 
is likely, as seen in phengite-albite exposures on the east side of Arctic Ridge. Stratigraphically above the sulphide-
in 
bearing  horizons  significant  muscovite  as  paragonite 
sodium/magnesium  ratios  across  the  sulphide  bearing  horizons.  Of  particular  note  are  the  barium  (“Ba”)  species 
including  barite,  cymrite  (a  high-pressure  Ba  phyllosilicate),  and  Ba-bearing  muscovite,  phlogopite  and  biotite. 
These  species  associated  with  both  alteration  and  mineralization  has  also  been  strongly  remobilized  during 
metamorphism.   

is  developed  and  results 

in  a  marked  shift 

Historic  interpretation  of  the  genesis  of  the  Ambler  Schist  belt  deposits  have  called  for  a  syngenetic  VMS  origin 
with steep thermal gradients in and around seafloor hydrothermal vents resulting in metal deposition due to the rapid 
cooling  of  chloride  bound  base  metals.  A  variety  of  VMS  types  have  been  well  documented  in  the  literature 
(Franklin et al. 2005) with the Ambler Schist belt deposits most similar to deposits associated with a bimodal mafic 
dominant volcanism related to incipient rifting. The majority of field observations broadly support such a scenario at 
the Arctic Deposit and include: 1) the tectonic setting with Devonian volcanism in an evolving continental rift; 2) 
the geologic setting with bimodal volcanics including pillow basalts and limited felsic volcanic tuffs; 3) an alteration 
assemblage  with  well-defined  magnesium-rich  footwall  alteration  and  sodium-rich  hanging  wall  alteration;  and 
4) typical polymetallic base-metal mineralization with massive and semi-massive sulphides. Although the majority 
of  field  observations  support  a  VMS  genesis  to  the  deposits  of  the  Schist  belt,  a  series  of  other  observations  and 
characteristics suggest a more direct genetic link with that of the carbonate-hosted Bornite Deposit in the Devonian 
Bornite Carbonate Sequence. Both deposit types have been dated at 375 to 387 Ma suggesting a clear temporal link. 

The principal lithologic units captured in logging and mapping by us, in broad chronological order from oldest to 
youngest are as follows: greenstone, chlorite schist, talc schist, grey to black schists, metarhyolites, most notably the 
so-called button schist which serves as an important stratigraphic marker, quartz muscovite schists, diamictites and 
greywackes. 

37 

 
 
Arctic Project - Exploration 

NovaGold began exploration of the Arctic Deposit and surrounding lands of the Schist belt in 2004 after optioning 
the property from Kennecott.  Previous exploration on the Arctic Project during Kennecott’s tenure is summarized in 
“Arctic Project – History”. Field exploration was largely conducted during the period 2004 to 2007 with associated 
engineering  and  characterization  studies  between  2008  and  2012.  Table  2  summarizes  the  exploration  work 
conducted by NovaGold and us during our tenure from 2004 to 2012.  

Table 2: Summary of Trilogy/NovaGold Exploration Activities Targeting VMS-style Mineralization in the 
Ambler Sequence Stratigraphy and the Arctic Deposit (2004 – 2012) 

Work Completed 

Year 

Details 

Focus 

Geological Mapping 
- 
- 
- 
Geophysical Surveys 
SWIR Spectrometry 
TDEM 

Downhole EM 
Geochemistry 
- 
- 
- 
- 
Survey 
Collar 

Photography/Topography 
Technical Studies 
Geotechnical 
ML/ARD 
Metallurgy 
Geotechnical 
Hydrology 
Project Evaluation 
Resource Estimation 
PEA 

and 

2004 
2005 
2006 

2004 
2005 
2006 
2007 
2007 

2005 
2006 

2007 

- 
- 
- 

Arctic Deposit surface geology 
Ambler Sequence west of the Arctic Deposit 
COU, Dead Creek, Sunshine, Red 

2004 drill holes  Alteration characterization 

2 loops 
13 loops 
6 loops 
4 drill holes 

Follow-up of Kennecott DIGHEM EM survey 
District targets 
Arctic extensions 
Arctic Deposit 

- 
- 
- 
- 

Stream silts – core area prospects 
Soils – core area prospects 
Stream silts – core area prospects 
Soils – Arctic Deposit area 

2004 to 2011 
2004, 2008 
2010 

GPS 
Resurveys 
- 

All 2004 to 2011 Trilogy drill holes 
Historical Kennecott drill holes 
Photography/topography 

2010 
2011 
2012 
2012 

2008 
2011 
2012 

BGC 
SRK 
SGS 
BGC 

SRK 
SRK 
SRK 

Preliminary geotechnical and hazards 
Preliminary ML and ARD 
Preliminary mineralogy and metallurgy 
Preliminary rock mechanics and hydrology 

Resource estimation 
PEA 
PEA update 

Note: SWIR = short wave infrared; ML = metal leaching; BGC = BGC Engineering Inc.; SRK = SRK Consulting 

The results of the above exploration programs have been incorporated into the PEA results, summarized under the 
heading  “Arctic Project – Exploration and Development”. For further details, refer to the PEA. Exploration  work 
conducted during the 2015 and 2016 summer field programs are summarized under the heading  “Arctic Project – 
Current Activities”. 

Arctic Project - Mineralization  

In 2013, we updated the mineralization models, representing massive and semi-massive VMS-style mineralization. 
Geometrically, the mineralization is confined to six lenticular mineralized zones concentrated along an isoclinal fold 
hinge. Five of the six SMS zones contain a core of MS material. For more details regarding length, width, depth and 
continuity  together  with  a  description  of  the  type,  character  and  distribution  of  the  mineralization  see 
“Local/Property Geology” above. 

38 

 
 
Arctic Project - Drilling 

Drilling  at  the  Arctic  Deposit  has  been  ongoing  since  its  initial  discovery  in  1965.  Approximately  31,907 m  of 
drilling in 135 drill holes have been completed at the deposit or on potential extensions in 23 campaigns spanning 45 
years. All of the drill campaigns between 1965 and 2012 have been run under the auspices of either: 1) Kennecott 
and its subsidiaries, or 2) NovaGold, our predecessor company. 

We and our predecessor company NovaGold, have drilled 17,983 m in 59 different drill holes targeting the Arctic 
Deposit  and  several  other  prospects  of  the  Ambler  Schist  belt.  Table  3  summarizes  all  of  the  Trilogy/NovaGold 
tenure drilling on the property. Drilling conducted during the 2015 and 2016 summer field programs are summarized 
under the heading “Arctic Project – Current Activities”. 

Table 3: Summary of Trilogy/NovaGold Drilling (2004 – 2012) 

Year 

Meters 

No. of 
Drill Holes 

2004 
2005 
2006*** 
2007 
2008* 
2011** 
2012*** 

2,996 
3,030 
3,100 
2,606 
3,306 
1,193 
1,752 

11 
9 
12 
4 
14 
5 
4 

Sequence 

Purpose of Drilling 

AR04-78 to 88 
AR05-89 to 97 
AR06-98 to 109 
AR07-110 to 113 
AR08-114 to 126 
AR11-127 to 131 
SC12-014 to 017 

Deposit scoping and verification 
Extensions to the Arctic Deposit 
Property-wide exploration drilling 
Deep extensions of the Arctic Deposit 
Grade continuity and metallurgy 
Geotechnical studies 
Exploration drilling – Sunshine 

Notes: 

*A  total  of  12  of  the  14  holes  drilled  in  2008  were  utilized  in  the  2012  SRK  resource  update.    Two  holes  were 
maintained in sealed frozen storage to provide additional metallurgical samples if required. 
**Geotechnical holes drilled in 2011 are not included in the current resource estimation contained herein.  
***Drilling in 2006 and 2012 targeted exploration targets elsewhere in the VMS belt. 

Over the Arctic Project’s history, a relatively limited number of drill companies have been used by Kennecott and 
Trilogy/NovaGold  at  the  Arctic  Deposit.  During  Kennecott’s  tenure  on  the  property,  Sprague  and  Henwood,  a 
Pennsylvania-based  drilling  company  was  the  principal  contractor.  Sprague  and  Henwood  utilized  company 
manufactured  drill  rigs  during  their  tenure  on  the  property.  Many  of  their  rigs  remain  at  the  Bornite  Deposit  and 
constitute  a  historical  inventory  of  1950s  and  1960s  exploration  artifacts.  Tonto  Drilling  provided  services  to 
Kennecott during Kennecott’s short return  to the district in the late 1990s. We and NovaGold have utilized Boart 
Longyear  as  our  only  contractor. The  2004  to  2012 Trilogy/NovaGold  drill  programs  used  a  single  skid-mounted 
LF-70 core rig, drilling HQ or NQ core. Wireframes were updated in 2013 to incorporate interpretation of all drill 
results to date and have been included in the resource estimate.  

Arctic Project - Sampling Methodology and Analysis 

The data for the Arctic Deposit resource was generated over three primary drilling campaigns: 1966 to 1986 when 
BCMC,  a  subsidiary  of  Kennecott  Copper  Corporation  was  the  primary  operator,  1998 when  Kennecott  Minerals 
resumed work after a long hiatus, and 2004 to 2012 with NovaGold and now us as the operators. 

Sampling of drill core prior to 1998 by BCMC focused primarily on the mineralized zones; numerous intervals of 
weak  to  moderate  mineralization  were  not  sampled  during  this  period.  During  the  1998 campaign,  Kennecott  did 
sample some broad zones of alteration and weak mineralization, but much of the unaltered and unmineralized drill 
core was left unsampled. Little documentation on historic sampling procedures is available. 

Between  2004  and  2006,  NovaGold  conducted  a  systematic  drill  core  re-logging  and  re-sampling  campaign  of 
Kennecott  and  BCMC  era  drill  holes  AR-09  to  AR-74.  NovaGold  either  took  1  to  2 m  samples  every  10 m,  or 
sampled entire lengths of previously unsampled core  within a  minimum of 1 m and a  maximum of 3 m intervals. 
The  objective  of  the  sampling  was  to  generate  a  full  ICP  geochemistry  dataset  for  the  Arctic  Deposit  and  ensure 
continuous sampling throughout the deposit. Sample preparation procedures for NovaGold era work are described 
below. 

39 

 
 
All drill core was transported by helicopter in secure core “baskets” to either the Dahl Creek camp or the Bornite 
camp for logging and sampling.  Sample intervals  were determined by  the  geologist during  the  geological  logging 
process. Sample intervals were labelled with white paper tags and butter (aluminum) tags which were stapled to the 
core  box.  Each  tag  had  a  unique  number  which  corresponded  to  that  sample  interval.  Sample  intervals  were 
determined by the geological relationships observed in the core and limited to a three meter maximum length and 
one  meter  minimum  length. An attempt  was  made to terminate sample intervals at lithological and  mineralization 
boundaries. Sampling was generally continuous from the top to the bottom of the drill hole. When the hole was in 
unmineralized rock, the sample length was generally three meters, whereas in mineralized units, the sample length 
was shortened to one to two meters. Geological and geotechnical parameters were recorded based on defined sample 
intervals and/or drill run intervals (defined by the placement of a wooden block at the end of a core run). Logged 
parameters  were  reviewed  annually  and  slight  modifications  have  been  made  between  campaigns,  but  generally 
include  rock  type,  mineral  abundance,  major  structures,  specific  gravity  (“SG”),  point  load  testing,  recovery  and 
rock quality designation measurements. Drill logs were converted to a digital format and forwarded to the Database 
Manager, who imported them into the master database. Core was photographed and then brought into the saw shack 
where it was split in half by the rock saw, divided into sample intervals, and bagged by the core cutters. Not all drill 
core was oriented; however, core that had been oriented was identified to samplers by a line drawn down the core 
stick. If core was not competent, it was split by using a spoon to transfer half of the core into the sample bag. Once 
the core was sawed, half was sent to ALS Chemex Laboratories (“ALS Chemex”) in Vancouver for analysis and the 
other half was stored at the Dahl Creek camp, but since has been consolidated at the storage facility at the Bornite 
camp facilities or at our warehouse in Fairbanks. Shipment of core samples from the Dahl Creek camp occurred on a 
drill hole by drill  hole basis.  Rice bags, containing  two to four poly-bagged core samples each,  were  marked and 
labelled with the ALS Chemex address, project and hole number, bag number, and sample numbers enclosed.  Rice 
bags were secured with a pre-numbered plastic security tie and a twist wire tie and then assembled into sling loads 
for  transport  by  chartered  flights  on  a  commercial  airline  to  Fairbanks,  where  they  were  met  by  a  contracted 
expeditor for delivery directly to the ALS Minerals preparation facility in Fairbanks. In addition to the core, control 
samples were inserted into the shipments at the approximate rate of one standard, one blank and one duplicate per 20 
core samples: 

•  Standards:  four  standards  were  used  at  the  Arctic  Deposit.  The  core  cutter  inserted  a  sachet  of  the 

appropriate standard, as well as the sample tag, into the sample bag. 

•  Blanks: were composed of an unmineralized landscape aggregate. The core cutter inserted about 150 g of 

blank, as well as the sample tag, into the sample bag. 

•  Duplicates: the assay laboratory split the sample and ran both splits. The core cutter inserted a sample tag 

into an empty sample bag. 

Samples were logged into a tracking system on arrival at ALS Chemex, and weighed. Samples were then crushed, 
dried, and a 250 g split pulverized to greater than 85% passing 75 µm. 

Gold assays were determined using fire analysis followed by an atomic absorption spectroscopy finish. The lower 
detection  limit  was  0.005 ppm  gold;  the  upper  limit  was  1,000 ppm  gold.  An  additional  34-element  suite  was 
assayed by inductively coupled plasma-atomic emission  spectroscopy (“ICP-AES”)  methodology,  following  nitric 
acid aqua regia digestion. The copper analyses were completed by atomic absorption (“AA”), following a triple acid 
digest. 

The  accreditations  of  Primary  and  Secondary  assay  laboratories  used  during  the  1966  –  1986  campaigns  are  not 
known. ALS Analytical Lab (Fairbanks, Alaska) was the Primary assay lab between 1998 – present. ALS Chemex 
has  attained  International  Organization  for  Standardization  (“ISO”)  9001:2000  registration.  In  addition,  the  ALS 
Chemex  laboratory  in  Vancouver  is  accredited  to  ISO  17025  by  Standards  Council  of  Canada  for  a  number  of 
specific test procedures including fire assay of gold by AA, ICP and gravimetric finish, multi-element ICP and AA 
assays for silver, copper, lead and zinc. Trilogy has no relationship with any assay labs. 

During 2013, we conducted a 26% audit of the NovaGold era assay database fields: sample interval, Au, Ag, Cu, Zn, 
and Pb. This audit is documented in a series of memos. Our staff did not identify and/or correct any transcription 
and/or coding errors in the database prior to resource estimation. We also retained independent consultant Caroline 
Vallat,  P.Geo.  of  GeoSpark  Consulting  Inc.  to:  1)  re-load  100%  of  the  historical  assay  certificates,  2)  conduct  a 
QA/QC  review  of  paired  historical  assays  and  NovaGold  era  re-assays;  3)  monitor  an  independent  check  assay 
program for the 2004 to 2008 and 2011 drill campaigns; and 4) generate QA/QC reports for the 2004 to 2008 and 
2011 drill campaigns.   

40 

 
 
 
Arctic – Security of Samples 

Security measures taken during historical Kennecott and BCMC programs are unknown to NovaGold or us. We are 
not aware of any reason to suspect that any of these samples have been tampered with. The 2004 to 2011 samples 
were  either  in  the  custody  of  NovaGold  personnel,  contractors  or  the  assay  laboratories  at  all  times  as  discussed 
above, and the chain of custody of the samples is well documented. 

Arctic Project - Mineral Resource Estimate 

The  mineral  resource  estimate  was  prepared  by  Tetra  Tech  with  an  effective  date  of  the  resource  estimate  as  of 
July 30, 2013. Mineral Resources are classified in accordance with the 2010 CIM Definition Standards for Mineral 
Resources and Mineral Reserves. 

The  mineral  resource  model  prepared  by  Tetra  Tech  considers  diamond  drill  holes  drilled  by  different  operators 
during  the  period  1965  to  2011.  The  majority  of  the  assaying  has  been  completed  in  recent  years  by  us  and  our 
previous  parent  company  NovaGold.    The  mineral  resource  for  the  Arctic  Project  is  supported  by  43  core  holes 
(approximately  13,500 m)  drilled  by  NovaGold  and  92  core  holes  (approximately  17,600 m)  drilled  by  previous 
owners  Kennecott,  and/or  a  Kennecott  subsidiary.  The  geological  and  assay  database  used  to  estimate  the  Arctic 
Project mineral resources have been reviewed and audited by Tetra Tech.   

Leapfrog™ software (version 2.5.1) was used to review and verify the resource estimation domains, prior to being 
imported into Isatis™ software (version 2012.1) to prepare assay data for geostatistical analysis, variography, block 
model construction, metal grade estimation and mineral resource tabulation. Mineral Resources were estimated into 
five  MS  and  six  SMS  lenses,  and  then  combined  for  an  overall  grade  for  the  mineralized  portion  of  the  10 m  by 
10 m by 5 m block.  Extreme lead and gold assays were capped prior to compositing.  Ordinary kriging and inverse 
distance squared estimates were run, with ordinary kriging used for resource reporting and inverse distance squared 
used for validation. Search parameters were constrained within each mineralized domain and required an optimum 
number  of  15  composites,  minimum  number  of  5  composites,  minimum  number  of  2  drill  holes,  and  maximum 
search distance range of 200 m. In general, blocks categorized as Indicated were supported by at least two drill holes 
within a 75 m search radii, and blocks categorized as Inferred were supported by at least 2 drill holes within a 150 m 
search radii. Estimated resources for the Arctic Deposit are reported in the following Table 4 and Table 5. 

The Arctic Project has no known reserves.  

The  PEA  is  preliminary  in  nature  and  includes  inferred  mineral  resources  that  are  considered  too  speculative 
geologically  to  have  the  economic  considerations  applied  to  them  that  would  enable  them  to  be  categorized  as 
mineral  reserves.  There  is  no  certainty  that  the  estimates  contained  in  the  PEA  will  ever  be  realized.  Mineral 
resources that are not mineral reserves do not have demonstrated economic viability. 

Table 4  Indicated Resource Estimate for the Arctic Project (NSR Cut-off of $35/t) 

Cautionary Note to United States Investors concerning estimates of Indicated Resources. This section uses the term 
“indicated  resources”.  We  advise  United  States  investors  that  these  terms  are  not  recognized  by  the  SEC.  United 
States investors are cautioned not to assume that estimates of indicated mineral resources are economically minable, 
or  will  be  upgraded  into  measured  mineral  resources.  See  “Risk  Factors”  and  “Cautionary  Note  to  United  States 
Investors.” 

Category  Mt 

Cu  
(%) 

Zn  
(%) 

Pb  
(%) 

Indicated 

23.848 

3.26 

4.45 

0.76 

Au  
(g/t) 

0.71 

Ag  
(g/t) 

53.2 

Cu 
(Mlb) 

Zn 
(Mlb) 

Pb 
(Mlb) 

Au 
(Moz) 

Ag 
(Moz) 

1,713 

2,338 

400.9 

0.55 

40.8 

Notes: 

1.  These resource estimates have been prepared in accordance with NI 43-101 and the Canadian 

Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards.  Mineral resources 
that are not mineral reserves do not have demonstrated economic viability.  See “Risk Factors” and 
“Cautionary Note to United States Investors.” 

2.  Mineral Resources are reported within mineralization wireframes, contained within an Indicated pit 
design using an assumed copper price of $2.90/lb, zinc price of $0.85/lb, lead price of $0.90/lb, 
silver price of $22.70/oz, and gold price of $1,300/oz. 

3.  Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles were 

used to generate the pit design. 

41 

 
 
 
4.  The $35.01/t milled cut-off is calculated based on a process operating cost of $19.03/t, G&A of 
$7.22/t and site services of $8.76/t.  NSR equals payable metal values, based on the metal prices 
outlined in Note 2 above, less applicable treatment, smelting, refining costs, penalties, concentrate 
transportation costs, insurance and losses and royalties. 

5.  The LOM strip ratio was estimated at 8.39. 
6.  Rounding as required by reporting guidelines may result in apparent summation differences 

between tonnes, grade and contained metal content. 

7.  Tonnage and grade measurements are in metric units.  Contained copper, zinc and lead pounds are 

reported as imperial pounds, contained silver and gold ounces as troy ounces. 

Table 5  Inferred Resource Estimate for the Arctic Project (NSR Cut-off of $35/t) 

Cautionary Note to United States Investors concerning estimates of Inferred Resources. This section uses the term 
“inferred  resources”.  We  advise  United  States  investors  that  these  terms  are  not  recognized  by  the  SEC.  The 
estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the 
estimation  of  other  categories  of  resources.  United  States  investors  are  cautioned  not  to  assume  that  estimates  of 
inferred mineral resources exist, are economically minable, or will be upgraded into measured or indicated mineral 
resources.  See “Risk Factors” and “Cautionary Note to United States Investors.” 

Category  Mt 

Cu  
(%) 

Inferred 

3.363 

3.22 

Zn  
(%) 

3.84 

Pb  
(%) 

0.58 

Au  
(g/t) 

0.59 

Ag  
(g/t) 

41.5 

Cu 
(Mlb) 

Zn 
(Mlb) 

Pb 
(Mlb) 

Au 
(Moz) 

Ag 
(Moz) 

239 

285 

43.2 

0.06 

4.5 

Notes: 

1.  These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition 

Standards.  See “Risk Factors” and “Cautionary Note to United States Investors.”  

2.  Mineral Resources are reported within mineralization wireframes, contained within an Inferred pit 
design using an assumed copper price of $2.90/lb, zinc price of $0.85/lb, lead price of $0.90/lb, 
silver price of $22.70/oz, and gold price of $1,300/oz. 

3.  Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles were 

used to generate the pit design. 

4.  The $35.01/t milled cut-off is calculated based on a process operating cost of $19.03/t, G&A of 
$7.22/t and site services of $8.76/t.  NSR equals payable metal values, based on the metal prices 
outlined in Note 2 above, less applicable treatment, smelting, refining costs, penalties, concentrate 
transportation costs, insurance and losses and royalties. 

5.  The LOM strip ratio was estimated at 8.39. 
6.  Rounding as required by reporting guidelines may result in apparent summation differences 

between tonnes, grade and contained metal content. 

7.  Tonnage and grade measurements are in metric units.  Contained copper, zinc and lead pounds are 

reported as imperial pounds, contained silver and gold ounces as troy ounces. 

Arctic Project – Mining Operations 

The Arctic Project is not currently in production; for contemplated exploration or development activities see below. 

Arctic Project – Exploration and Development    

As noted in the summary Arctic Project – Technical Report above, we engaged Tetra Tech to prepare a PEA for the 
Arctic  Project.  The  following  summary  describes  the  main  results  and  assumptions  of  the  PEA  not  previously 
discussed  above.  See  “Arctic  Project  –  Current  Activities”  below  for  a  description  of  the  Company’s  current  and 
contemplated exploration.  

The PEA is based on a conventional truck-and-shovel, open-pit mine design at a single pit. The mining schedule was 
developed  based  on  a  maximum  mill  capacity  of  10,000 t/d.  The  Arctic  Project’s  total  mine  life  is  13  years, 
including 1 year of pre-stripping followed by 12 years of production. The pit uses four pushbacks and a minimum 
mining width of 40 m. Over the 13-year life, the pit is producing 35.7 Mt of mineralized material and 299.4 Mt of 
waste  rock.  The  life-of-mine  (“LOM”)  stripping  ratio  is  8.39  and  the  stripping  ratio  excluding  the  pre-stripping 
waste rock is 7.94. The mining schedule does not currently consider a low-grade stockpiling option but this can be 
assessed in more detail in future studies.   

Mineral Processing and Metallurgical Testing 

42 

 
 
 
 
 
Since  1970,  metallurgical  test  work  has  been  conducted  to  determine  the  flotation  response  of  various  samples 
extracted  from  the  Arctic  Deposit.  In  general,  the  samples  tested  produced  similar  metallurgical  performances.  In 
2012,  SGS  Mineral  Services  (“SGS”)  conducted  a  metallurgical  test  program  to  further  study  metallurgical 
responses of the  samples produced from  Zones 1, 2, 3, and 5 of the  Arctic Deposit. The flotation test procedures 
used  talc  pre-flotation,  conventional  copper-lead  bulk  flotation  and  zinc  flotation,  followed  by  copper  and  lead 
separation. In general, the 2012 test results indicated that the samples responded well to the flowsheet tested. Below 
is a summary of average results of the locked cycle tests (without copper and lead separation). 

•  The copper recoveries to the bulk copper-lead concentrates ranged from 89 to 93% excluding the Zone 1 & 
2  composite  which  produced  a  copper  recovery  of  approximately  84%;  the  copper  grades  of  the  bulk 
concentrates were 24 to 28%. 

•  Approximately 92 to 94% of the lead was recovered to the bulk copper-lead concentrates containing 9 to 

13% lead. 

•  The zinc recovery was 84.2% from Composite Zone 1 & 2, 93.0% from Composite Zone 3 and 90.5% from 
Composite  Zone 5.  On  average,  the  zinc  grades  of  the  concentrates  produced  were  higher  than  55%, 
excluding the concentrate generated from Composite Zone 1 & 2, which contained only 44.5% zinc. 

•  Gold and silver were predominantly recovered into the bulk copper-lead concentrates. Gold recoveries to 

this concentrate ranged from 65 to 80%, and silver recoveries ranged from 80 to 86%. 

Using an open circuit procedure, the copper and lead separation tests on the bulk copper-lead concentrate produced 
from  the  locked  cycle  tests  generated  reasonable  copper  and  lead  separation.  The  copper  concentrates  produced 
contained approximately 28 to 31% copper, while the grades of the lead concentrates were in the range of 41% to 
67% lead. Also, it appears that most of the gold reported to the copper concentrate and on average the silver was 
equally recovered into the copper and lead concentrates. 

The 2012 grindability test results showed that the Bond ball millwork index tests ranged from 6.5 to 11 kWh/t and 
abrasion  index  tests  fluctuated  from  0.017  to  0.072 g  for  the  mineralized  samples.  The  data  indicates  that  the 
samples are neither resistant nor abrasive to ball mill grinding. The materials are considered to be soft or very soft in 
terms of grinding requirements. 

Recovery Methods 

A 10,000 t/d process plant has been designed to process the massive and semi-massive  sulphide  mineralization of 
the Arctic property.  The main economic elements found in the deposit are copper, zinc, lead, and associated gold 
and silver. The process plant  will operate two twelve  hour  shifts per day, 365 days per  year  with an overall plant 
availability of 92%. The process plant will produce three concentrates: 1) copper concentrate, 2) zinc concentrate, 
and 3) lead concentrate.  Gold and silver are expected to be payable at a smelter and are recovered in both the copper 
and lead concentrates.  The process plant feed will be supplied from the Arctic open pit mine. 

The mill feed will be hauled from the open pit to a primary crushing facility where the material will be crushed by a 
jaw crusher to a particle size of 80% passing 125 mm. 

The  crushed  material  will  be  ground  by  two  stages  of  grinding,  consisting  of  one  SAG  mill  and  one  ball  mill  in 
closed  circuit  with  hydrocyclones  (SAB  circuit).  The  hydrocyclone  overflow  with  a  grind  size  of  approximately 
80%  passing  70 µm  will  first  undergo  pre-talc  flotation,  and  then  be  processed  by  conventional  bulk  flotation  (to 
recover copper, lead, and associated gold and silver),  followed by zinc flotation. The rougher bulk concentrate will 
be cleaned and followed by copper and lead separation to produce a lead concentrate and a copper concentrate. The 
final tailings from the zinc flotation circuit will be pumped to the TSF. Copper, lead, and zinc concentrates will be 
thickened and pressure-filtered before being transported by truck to a port and shipped to smelters. 

The LOM average mill feed is expected to contain 2.28% copper, 0.53% lead, 3.13% zinc, 0.5 g/t gold, and 37 g/t 
silver.  According  to  the  mine  plan  developed  for  the  PEA  study  and  metallurgical  test  results,  the  LOM  average 
metal recoveries and concentrate grades are projected below: 

• 

copper concentrate recovery: 87.1% copper; 57.9% gold; 40.2% silver; copper grade: 29% 

43 

 
 
• 

• 

lead concentrate recovery: 74.0% lead; 6.8% gold; 40.2% silver; lead grade: 50% 

zinc concentrate recovery: 86.8% zinc; zinc grade: 56%. 

Tailings and Storage Facility 

The  co-disposal  TSF  will  be  a  fully  lined  facility  consisting  of  rockfill  embankment  constructed  across  the  Sub-
Arctic Creek drainage, creating an impoundment that will extend up the drainage. The rockfill embankment will be 
constructed to an ultimate crest elevation of 655 masl with the embankment being raised in stages to minimize the 
initial capital construction cost. During operations, potential acid generating (“PAG”) waste rock will be placed at 
the bottom and sides of the basin forming layers with consecutive disposal on tailings that will be filling the voids.  
The  tailings  has  the  potential  to  generate  acid  and,  therefore,  the  tailings  and  the  PAG  waste  rock  will  be  placed 
under  water  and  remain  permanently  submerged  in  order  to  reduce  the  potential  for  acid  generation.    Additional 
studies  will  be  required  to  determine  the  most  suitable  method  of  co-disposal  and  potential  requirements  for  acid 
rock drainage (“ARD”) management and mitigation programs will need to be part of the design of the TSF. 

The TSF  will be required to  contain 110.5 Mm3 total over the 12-year  LOM,  with 23.8 Mm3  to accommodate the 
tailings  at  an  assumed  stored  dry  density  of  1.5 t/m3  and  86.7 Mm3  of  PAG  waste  rock  at  an  assumed  stored  dry 
density of 1.9 t/m3. The TSF will be sited as a  staged rockfill embankment  with an upstream geomembrane liner. 
The starter embankment  will  have a crest elevation of 560 m and impound 1  year of  mining production,  which is 
approximately 670,000 m3 of tailings and 12.3 Mm3 of waste rock. 

Arctic Project - Environmental Considerations    

Environmental  baseline  data  collection  was  initiated  in  2007,  including  surface  water  quality  sampling,  wetlands 
mapping,  stream  flow  monitoring,  aquatic  life  surveys,  subsistence,  meteorological  monitoring,  and  acid  base 
accounting  sampling.  Additional  baseline  environmental  data  in  the  Ambler  Lowlands,  the  Subarctic  Creek 
drainage, the Shungnak River drainage and downstream receiving environments will be required to support future 
mine design, development of an environmental impact statement, permitting, construction and operations. 

The Arctic Project has the potential to significantly improve work opportunities for local and regional residents. In 
October 2011, we signed an agreement with NANA which in addition to consolidating landholdings in the Ambler 
district has language establishing native hiring preferences and preferential use of NANA subsidiaries for contract 
work. Furthermore, the agreement formalized an Oversight Committee, with equal representation from NANA and 
us,  to  regularly  review  project  plans  and  activities.  In  addition,  a  Subsistence  Subcommittee  has  been  formed  to 
protect  subsistence  and  the  Iñupiaq  way  of  life  and  a  Workforce  Development  Subcommittee  is  also  in  place  to 
address  current  and  future  employment  needs.  We  meet  monthly,  during  summer  months,  with  the  residents  of 
Kobuk, Shungnak and Ambler, the three villages closest to the project area. We also meet annually with eight other 
NANA region villages including Noatak, Kivalina, Kotzebue, Kiana, Deering, Buckland, Selawik and Noorvik, for 
the  purpose  of  updating  residents  on  project  plans  and  fielding  their  questions  and  concerns.  We  have  also 
developed a good working relationship with the NWAB government. 

The  Arctic  Project  will  be  subject  to  a  mine  permitting  process  which  will  include  compliance  with  the  National 
Environmental Policy Act and will require a number of major mine permits from state and federal agencies as well 
as a significant number of minor permits.  Although a number of federal conservation units are located in the general 
vicinity of the Arctic Project, including but not limited to the Gates of the Arctic National Parks, Kobuk Preserve, 
Selawik National Wildlife Refuge, and Kobuk Valley and Selawik Wilderness areas, there presence does not change 
the permitting process nor add to the number of permits required for the Arctic Project. 

We will be required to develop a formal project description and detailed reclamation and closure plan to support a 
successful permit application strategy. The mine plan will embrace the concept of “design for closure”. In order to 
reduce any lasting risk of environmental impacts, the plan will minimize surface disturbances during operations and 
promote long-term stability of the site after closure. 

No assurance can be given that new laws and regulations will not be enacted or that existing laws and regulations 
will  not  be  applied  in  a  manner  that  could  limit  or  curtail  the  Arctic  Project.  Amendments  to  current  laws, 
regulations,  licenses  and  permits  governing  operations  and  activities  of  mining  companies,  or  more  stringent 
implementation thereof, could have a  material adverse impact on the  Arctic Project and cause increases in capital 

44 

 
 
expenditures or production costs, or reduction in levels of production, or abandonment, or delays in the development 
of the business. 

Arctic Project - Current Activities 

2015 

The focus of  work on the  Arctic Project in 2015 was drilling, surficial  field investigations and desktop studies to 
support  pre-feasibility.  Trilogy  completed  fourteen  diamond  drill  holes  for  a  total  of  3,056  m  of  core;  including 
twelve in-fill drill holes, representing 2,425 m, designed to evaluate vertical and lateral continuity of the high-grade 
polymetallic  copper,  gold,  silver,  lead  and  zinc  mineralization,  and  support  upgrading  of  inferred  resources  to 
measured  and  indicated  resource  classification  within  the  area  of  the  proposed  Arctic  open-pit  as  outlined  in  the 
PEA, and two drill holes, representing 631 m, specifically targeting geotechnical and hydrogeological information. 
Based  on  a  cut-off  grade  of  1.0%  copper  all  fourteen  drill  holes  intersected  significant  intervals;  defined  as  a 
minimum of 1.0 meter copper interval with average grade >0.7% copper.   

The 2015 drill program, sampling protocol and data verification were managed and overseen by qualified persons 
employed  by  Trilogy.  The  twelve  in-fill  diamond  drill  holes  were  drilled  at  NQ  diameter  drill  core  and  the  two 
geotechnical drill holes were drilled at HQ diameter drill core by Boart Longyear of South Jordan, Utah. Samples in 
mineralized  core  were  collected  using  a  0.3-meter  minimum  length,  2.0-meter  maximum  length  and  0.9-meter 
average sample length. Samples in un-mineralized core were collected using 2.0-meter minimum length, 10-meter 
maximum length and 4-meter average sample length. Drill core recovery averaged 94% without overburden. Three 
quality  control  samples  (one  blank,  one  standard  and  one duplicate)  were  inserted  into  each  batch  of  20  samples. 
The drill core was either sawn or shipped as whole core, with samples sent to ALS Minerals, Fairbanks, Alaska for 
sample preparation and the sample pulps forwarded to ALS’s North Vancouver facility for analysis. ALS Minerals 
in North Vancouver, B.C., Canada, is a facility certified as ISO 9001:2008 and accredited to ISO / IEC 17025:2005 
from the Standards Council of Canada.  

In  addition  to  the  drill  program,  Trilogy  contracted  SRK  Consulting  of  Vancouver,  Canada  (SRK)  to  conduct  a 
dedicated field investigation comprised of drill logging, mapping, laboratory test work and downhole installations. A 
summary report detailing a gap analysis, desktop study findings and field investigation recommendations was issued 
prior  to  the  drill  program.  Two  dual  purpose  drill  holes  were  completed  for  geotechnical  (soil  and  rock)  and 
hydrogeological  data  acquisition.  Additionally,  SRK  hydrogeologists  re-visited  previously  installed  vibrating  wire 
piezometers  to  ensure  data  loggers  were  operational  and  to  download  pore  pressure  measurement  data.  A  civil 
geotechnical  site  visit  was  conducted  to  investigate  surface  conditions  and  provide  comment  on  potential 
infrastructure and waste management facilities layout. Furthermore, structural mapping of exposed rock faces along 
the  Arctic  ridge  along  with  downhole  televiewer  and  structural  logging  of  newly  acquired  drill  core  were 
consolidated with prior work to support a 3D structural model.  

Under the guidance of SRK, Trilogy initiated acid-base-accounting kinetic test work at Arctic in 2015; both on-site 
barrel  testing  and  parallel  laboratory  humidity  cells.    In  addition,  Trilogy  collected  samples  from  the  2015  drill 
program to increase static testing coverage over the Arctic deposit. 

Environmental baseline data collection continued in 2015, including 34,000 acres of wetlands delineation within the 
project area, which was completed by WHPacific of Anchorage, Alaska. Seventy percent of a LiDAR survey over 
the UKMP was completed by WHPacific and Quantum Spatial before weather conditions became unfavorable. 

2016 

Site  investigation  activities  continued  at  the  UKMP  Projects  in  2016  and  were  mainly  focused  on  advancing  the 
Arctic project towards pre-feasibility. We completed thirteen diamond drill holes for a total of 3,058 meters of core. 
The 2016 drill program was designed to collect data for geotechnical, hydrological, waste rock characterization and 
metallurgical studies as well as further resource definition.  

Three drill holes representing 822 meters drilled were designed to collect geotechnical and hydrological data within 
the  proposed  Arctic  open-pit.  Data  collected  from  the  geotechnical/hydrological  drill  program  and  outcrop/seeps 
mapping was used to update a 3D structure model, rock mass model, and hydrogeology model and these results have 
been integrated into a combined geotechnical model that will be used for characterization of geotechnical domains 
and slope stability evaluation in a future pre-feasibility study. 

45 

 
 
 
 
 
Four  drill  holes  representing  1,030  meters  drilled  were  designed  to  collect  metallurgical  samples,  specifically 
targeting  material  within  the  initial  production  years  of  the  Arctic  open-pit.  A  metallurgical  test  work  program  is 
currently underway and expected to be complete in Q1-2017. 

Six drill holes representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high 
grade polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources to 
Measured and Indicated resource classification  within the area of the proposed Arctic open-pit. We are pleased to 
announce  that  all  six  infill  holes  encountered  mineralized  intervals  consistent  with  previous  drilling  conducted 
within the resource area on the property. Data collected from the drill program was used to update the 3D geology 
model. The updated geology domains and drill data will be incorporated into an updated resource estimate that will 
support a future pre-feasibility study.  

The  drill  program,  sampling  protocol  and  data  verification  were  managed  and  overseen  by  qualified  persons 
employed by Trilogy Metals. Thirteen diamond drill holes were drilled at HQ and NQ diameter drill core by Boart 
Longyear  of  South  Jordan,  Utah.  Samples  in  mineralized  core  were  collected  using  a  0.2-meter  minimum  length, 
5.0-meter  maximum  length  and  1.4-meter  average  sample  length.  Samples  in  un-mineralized  core  were  collected 
using  0.2-meter  minimum  length,  5.0-meter  maximum  length  and  3.2-meter  average  sample  length.  Drill  core 
recovery averaged 94% with overburden. Three quality control samples (one blank, one standard and one duplicate) 
were inserted into each batch of 20 samples. The drill core was either sawn or shipped as whole core, with samples 
sent  to  ALS  Minerals,  Fairbanks,  Alaska  for  sample  preparation  and  the  sample  pulps  forwarded  to  ALS's  North 
Vancouver  facility  for  analysis.  ALS  Minerals  in  North  Vancouver,  B.C.,  Canada,  is  a  facility  certified  as  ISO 
9001:2008 and accredited to ISO / IEC 17025:2005 from the Standards Council of Canada. 

In  addition  to  the  drill  program,  we  conducted  an  aquatics  survey,  avian  survey,  habitat  survey,  archaeological 
survey, and wetlands delineation survey, and continued ongoing baseline environmental data collection in 2016. 

An aquatics survey of rivers and creeks over the UKMP Projects included identification of fish species present and 
tissues  metals  testing.  An  avian  survey  over  the  UKMP  Projects  was  conducted  in  May  to  identify  bird  nest 
locations,  with  a  follow-up  survey  in  July  to  measure  fledging  success.  A  habitat  survey  was  completed  in 
conjunction  with  the  wetlands  survey  and  will  be  used  to  inform  future  biological  surveys.  Approximately  2,400 
acres were surveyed for archaeological resources in or around the potential Arctic open-pit and facilities locations. 
Approximately 2,900 acres of wetlands were delineated using techniques approved by the Army Corps of Engineers. 

On-going baseline environmental data collection included maintenance of three hydrologic gauging stations and one 
meteorological station. Surface water quality samples were taken from sixteen surface water locations and analyzed 
for a full suite of parameters including total and dissolved metals. 

We  continue  to  advance  the  acid-base-accounting  static  and  kinetic  test  work  at  Arctic.  Continuous  down-hole 
samples were collected from the 2016 drill program to support static testing coverage over the Arctic deposit. On-
site barrel sampling was successfully completed in the spring and fall of 2016 to support the kinetics program, and 
in  August  we  achieved  the  40-week  milestone  for  the  parallel  laboratory  humidity  cells;  maintenance  and 
monitoring of all kinetic tests will continue into 2017. 

The LiDAR survey that was incomplete last year due to weather conditions was also completed during the summer. 
Final  deliverables  received  in  the  fall  of  2016  are  being  utilized  to  support  on-going  engineering  design  and 
geological modeling. 

Bornite Project, Ambler District, Alaska  

Bornite Project 

Except for the information under the heading “Bornite Project – Current Activities” and except as otherwise stated, 
the scientific and technical information relating to the Bornite Project contained in this Form 10-K is derived from, 
and  in  some  instances  is  an  extract  from,  the  technical  report  titled  “NI  43-101  Technical  Report  on  the  Bornite 
Project,  Northwest  Alaska,  USA”  report  dated  effective  April  19,  2016  released  May  16,  2016  (the  “Bornite 
Report”)  prepared  by  BD  Resource  Consulting,  Inc.,  SIM  Geological  Inc.,  and  International  Metallurgical  & 
Environmental Inc. Erin Workman, P.Geo., an employee and Director, Technical Services, is a Qualified Person as 
defined in NI 43-101, and has approved the scientific and technical information contained herein. The information 
regarding the Bornite Project is based on assumptions, qualifications and procedures which are not fully described 

46 

 
 
 
 
 
 
 
 
 
 
 
herein. Reference should be made to the full text of the Bornite Report which has been filed with certain Canadian 
securities regulatory authorities pursuant to NI 43-101 and is available for review on SEDAR at www.sedar.com and 
on EDGAR at www.sec.gov. 

Bornite Project - Property Description and Location 

The property is located in the Ambler mining district of the southern Brooks Range, in the NWAB of Alaska. The 
property is located in Ambler River A-2 quadrangle, Kateel River Meridian T 19N, R 9E, sections 4, 5, 8 and 9. The 
Bornite Project is located 248 km east of the town of Kotzebue, 19 km north of the village of Kobuk, 275 km west 
of the Dalton Highway, an all-weather state maintained public road, at geographic coordinates N67.07° latitude and 
W156.94°  longitude  (Universal  Transverse  Mercator  (UTM)  North  American  Datum  (NAD)  83,  Zone  4W 
coordinates 7440449N, 589811E).  

Bornite Project - Accessibility, Climate, Local Resources, Infrastructure, and Physiography 

Primary access to the Bornite Project is by air, using both fixed wing aircraft and helicopters. There are four well 
maintained,  approximately  1,500  m-long  gravel  airstrips  located  near  the  property,  capable  of  accommodating 
charter fixed wing aircraft. These airstrips are located 40 km west at Ambler, 23 km southwest at Shungnak, 19 km 
south at Kobuk, and 15 km south at Dahl Creek. There is daily commercial air service from Kotzebue to the village 
of  Kobuk,  the  closest  community  to  the  property.  During  the  summer  months,  the  Dahl  Creek  Camp  airstrip  is 
suitable  for  larger  aircraft,  such  as  C-130  and  DC-6.  In  addition  to  the  four  1,500  m  airstrips,  there  is  a  700  m 
airstrip located at the Bornite Camp. The airstrip at Bornite is suited to smaller aircraft, which support the Bornite 
Camp with personnel and supplies. 

There  is  no  direct  water  access  to  the  property.  During  spring  runoff,  river  access  is  possible  by  barge  from 
Kotzebue Sound to Ambler, Shungnak, and Kobuk via the Kobuk River. 

A two-lane, two-wheel drive gravel road links the Bornite Project’s main camp to the 1,525 m Dahl Creek airstrip 
and village of Kobuk. 

The climate in the region is typical of a sub-arctic environment. Exploration is generally conducted from late May 
until  late  September.  Weather  conditions  on  the  Bornite  Project  can  vary  significantly  from  year  to  year  and  can 
change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, 
while average lows range from -2°C to 7°C. By early October, unpredictable weather limits safe helicopter travel to 
the  property.  During  winter  months,  the  property  can  be  accessed  by  snow  machine,  track  vehicle,  or  fixed  wing 
aircraft. Winter temperatures  are routinely below -25°C and can exceed  -50°C.  Annual  precipitation in the region 
averages at 395 mm with the most rainfall occurring from June through September, and the most snowfall occurring 
from November through January. 

Drilling and mapping programs are seasonal and have been supported out of the Main Bornite Camp and Dahl Creek 
Camp. The main Bornite Camp facilities are located on Ruby Creek on the northern edge of the Cosmos Hills. The 
camp provides office space and accommodations for the geologists, drillers, pilots, and support staff. There are four 
2-person  cabins  installed  by  NANA  prior  to  our  tenure.  In  2011,  the  main  Bornite  Camp  was  expanded  to  20 
sleeping tents, 3 administrative tents, 2 shower/bathroom tents, 1 medical tent, and 1 dining/cooking tent. With these 
additions, the camp capacity was increased to 49 beds. A 30 m by 9 m core logging facility was also built in summer 
of 2011. An incinerator was installed near the Bornite airstrip to manage waste created by the Bornite Project. Power 
for  the  Bornite  Project  is  supplied  by  a  175  kW  Caterpillar  diesel  generator.  Water  is  provided  by  a  permitted 
artesian well located 250 m from the Bornite Camp. In 2012, the camp was further expanded with the addition of a 
laundry  tent,  a  women's  shower/washroom  tent,  a  recreation  tent,  several  additional  sleeping  tents,  and  a  2  x 
enlargement of the kitchen tent. Camp capacity increased to 76 beds. The septic field was upgraded to accommodate 
the  increase  in  camp  population.  One  of  the  two-person  cabins  was  winterized  for  use  by  the  winter  caretaker.  A 
permitted landfill was established to allow for the continued cleanup and rehabilitation of the historic shop facilities 
and surroundings. The Dahl Creek camp is a leased facility used as an overflow or alternative facility to the main 
Bornite Camp.  The Dahl Creek camp has a main cabin for dining and administrative duties, and a shower facility.  
Sleeping facilities include two hard-sided sleeping cabins with seven beds (primarily used for staff), one 4-person 
sleeping tent, and three 2-person sleeping tents for a total of 17 beds.  There are support structures, including a shop 
and storage facilities. 

47 

 
 
The Bornite Project is located on Ruby Creek on the northern edge of the Cosmos Hills. The Cosmos Hills are part 
of  the  southern  flank  of  the  Brooks  Range  in  Northwest  Alaska.  Topography  in  the  area  is  moderately  rugged. 
Maximum  relief  in  the  Cosmos  Hills  is  approximately  1,000  masl  with  an  average  of  600  masl.  Talus  covers  the 
upper  portions  of  the  hills;  glacial  and  fluvial  sediments  occupy  valleys.  The  Kobuk  Valley  is  located  at  the 
transition between boreal forest and Arctic tundra. Spruce, birch, and poplar are found in portions of the valley, with 
a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow drainages, and 
alpine tundra is found at higher elevations. Tussock tundra and low, heath-type vegetation covers most of the valley 
floor. Patches of permafrost exist on the property. Wildlife in the property area is typical of  Arctic and Subarctic 
fauna. Larger animals include caribou, moose, Dall sheep,  bears (grizzly and black),  wolves,  wolverines, coyotes, 
and foxes. Fish species include salmon, sheefish, arctic char, and arctic grayling. The Kobuk River, which briefly 
enters  the  Upper  Kobuk  Mineral  Projects  on  its  southwest  corner,  is  a  significant  salmon  spawning  river.  The 
caribou on the property belong to the Western Arctic herd that migrates twice a year – south in August, from their 
summer range north of the Brooks Range, and north in March from their winter range along the Buckland River. 

Bornite Project - History 

Kennecott and Bear Creek Mining Tenure  

Regional exploration began in the early 1900s when gold prospectors noted copper occurrences in the hills north of 
Kobuk, Alaska. In 1947, local prospector Rhinehart “Rhiny” Berg along with various partners traversing in the area 
located  outcropping  mineralization  along  Ruby  Creek  (Bornite)  on  the  north  side  of  the  Cosmos  Hills.  They 
subsequently staked claims over the Ruby Creek showings and constructed an airstrip for access. In 1957, BCMC, 
Kennecott's  exploration  subsidiary,  optioned  the  property  from  Berg.  Exploration  drilling  in  1961  and  1962 
culminated in the discovery of the “No.1 Ore Body” where drill hole RC-34 cut 20 m of 24% copper (the “No.1 Ore 
Body”  is  a  historic  term  used  by  BCMC  that  does  not  connote  economic  viability  in  the  present  context;  it  is 
convenient to continue  to use the  term  to describe exploration  work and  historic resource estimation in a  specific 
area of what is now generally known as Ruby Creek Upper Reef). The discovery of the “No.1 Ore Body” led to the 
development of an exploration shaft in 1966. The shaft, which reached a depth of 328 m, encountered a significant 
watercourse and was flooded near completion depth. The shaft was subsequently dewatered and an exploration drift 
was  developed  to  provide  access  for  sampling  and  mapping,  and  to  accommodate  underground  drilling  to  further 
delineate mineralization. A total of 59 underground holes were drilled and, after the program, the shaft was allowed 
to re-flood. The discovery of the Arctic Project in 1965 prompted a hiatus in exploration at Bornite, and only limited 
drilling occurred up until 1976. 

In the late 1990s, Kennecott resumed its evaluation of the Bornite deposit and the mineralization in the Cosmos Hills 
with an intensive soil, stream, and rock chip geochemical sampling program using 32 element ICP analyses. Grid 
soil  sampling  yielded  765  samples.    Ridge  and  spur  sampling  resulted  in  an  additional  850  soil  samples  in  the 
following  year. Skeletonized  core samples (85 samples) from  key  historic drill holes  were also analyzed using 32 
element ICP analytical methods. Geochemical sampling identified multiple areas of elevated copper and zinc in the 
Bornite region. 

Kennecott completed numerous geophysical surveys as an integral part of exploration throughout their tenure on the 
property.    Various  reports,  notes,  figures,  and  data  files  stored  in  Kennecott’s  Salt  Lake  City  exploration  office 
indicated that geophysical work included, but was not limited to, the following:  

•  Airborne magnetic and EM surveys (fixed-wing INPUT) (1950s) 

•  Gravity,  single  point  (“SP”),  Audio-Frequency  Magneto-Telluric  (“AMT”),  EM,  borehole  and  surface 

IP/resistivity surveys (1960s) 

•  Gravity, airborne magnetic, and CSAMT surveys (1990s) 

We  have  little  information  or  documentation  associated  with  these  geophysical  surveys  conducted  prior  to  the 
1990s. Where data are available in these earlier surveys, the lack of details in data acquisition, coordinate systems, 
and data reduction procedures limit their usefulness. The only complete geophysical report available concerns down-
hole IP/resistivity results. Most notable is the 1996 Bouger gravity survey from the Bornite deposit into the Ambler 
lowlands. The Bornite deposit itself is seen as a significant 3 milligal anomaly.  Numerous 2 milligal to > 6 milligal 
anomalies occur under cover in the Ambler lowlands and near the Aurora Mountain and Pardner Hill occurrences. In 

48 

 
 
addition  to  the  geophysical  surveys  conducted  by  Kennecott,  the  ADNR  completed  an  aeromagnetic  survey  of 
portions of the Ambler mining district in 1974-1975.   

Several studies have been undertaken reviewing the geology and geochemistry of the Bornite deposit. Most notable 
is  Murray  Hitzman’s  PhD  dissertation  at  Stanford  University  and  Don  Runnel’s  PhD  dissertation  at  Harvard 
University.  Bernstein  and  Cox  reported on  mineralization  of  the  “No.  1  Ore  Body”  in  a  1986  paper  in  Economic 
Geology.  In  addition  to  the  historical  work,  Ty  Connor  at  the  Colorado  School  of  Mines  recently  completed  a 
Master’s thesis which reported on the timing of alteration and mineralization at the Bornite deposit. 

Kennecott conducted two technical reviews of the groundwater conditions and a summary of the findings related to 
the flooding of the exploration shaft. In 1961, Kennecott collected 32 coarse reject samples from five drill holes to 
support preliminary metallurgical test work at Bornite. Samples targeted high-grade (> 10%) copper mineralization 
from the Upper Reef at Ruby Creek. 

Bornite Project - Geological Setting and Mineralization 

The Bornite Project is located within the Arctic Alaska Terrane, a sequence of mostly Paleozoic continental margin 
rocks that make up the Brooks Range and North Slope of Alaska. It is within the Phyllite Belt geologic subdivision, 
which  together  with  the  higher-grade  Schist  Belt,  stretches  almost  the  entire  length  of  the  Brooks  Range  and  is 
considered to represent the  hinterland of  the Jurassic Brooks  Range orogeny. The southern  margin of the Phyllite 
Belt  is  marked  by  mélange  and  low  angle  faults  associated  with  the  Kobuk  River  fault  zone,  while  the  northern 
boundary is thought to be gradational with the higher-grade metamorphic rocks of the Schist Belt. 

The  geology  of  the  Bornite  resource  area  is  composed  of  alternating  beds  of  carbonate  rocks  (limestone  and 
dolostone)  and  calcareous  phyllite.  Limestone  transitions  laterally  into  dolostone,  which  hosts  the  majority  of  the 
mineralization and is considered to be hydrothermal in origin. Spatial relationships and petrographic work establish 
dolomitization as genetically related to early stages of the copper mineralizing system. 

Work  by  Trilogy  in  2015  focused  on  furthering  the  understanding  of  the  distribution  and  nature  of  the  various 
lithologic  units  and  their  context  in  a  sedimentary  depositional  model.    The  updated  model,  based  on 
lithogeochemical  signatures  of  the  various  units  along  with  their  historical  visual  logging,  shows  stacked  debris 
flows  composed  of  basal  non-argillaceous  channelized  debris  flows  breccias  with  a  fining  upward  sequence  of 
increasingly argillaceous-rich breccias capped by high calcium (Ca) phyllites, confined laterally in channels between 
either massive or thin-bedded platform carbonates. Two stacked debris flow sequences are apparent, the Lower and 
Upper  reefs.    The  Upper  reef  grades  vertically  into  capping  argillaceous  limestones  instead  of  discrete  high  Ca 
phyllites indicating a shallowing upward or filling of the debris flow channels.  Based on this updated interpretation, 
a  series  individual  debris  flow  cycles  have  been  modeled.  Low  calcium  (Ca)  phyllites,  such  as  the  Anirak  schist 
(QP) and the Beaver Creek phyllite respectively underlie and cap the local stratigraphy suggesting different sourcing 
than  the  locally  derived  high  Ca  phyllites  of  the  debris  flow  dominated  Bornite  Carbonate  sequence  stratigraphy.  
The Beaver Creek is in structural contact with the Bornite Carbonate Sequence while the contact with the underlying 
Anirak schist is an unconformity. In addition to the stacked sedimentary stratigraphy, a crosscutting breccia dubbed 
the P-Breccia has been identified in and around the recently discovered South Reef mineralization.  Though poorly 
defined by the overall lack of drilling in the area, the body which contains excellent copper grade lies at or near the 
Iron  Mountain  discontinuity.    It  remains  unclear  whether  the  P  Breccia  is  a  post-depositional  structural, 
hydrothermal or solution-collapse induced breccia. 

Structural  fabrics  observed  on  the  property  include  bedding  and  two  separate  foliations.    Bedding  (S0)  can  be 
measured only rarely where phyllite and carbonate are interbedded and it is unclear to what extent it is transposed.  
The  pervasive  foliation  (S1)  is  easily  measured  in  phyllites  and  may  be  reflected  by  colour  banding  and/or 
stylolamination (flaggy habit in outcrop) of the carbonates.  Core logging shows that S1 is folded gently on the 10 m 
scale and locally tightly folded at the decimetre scale.  S2 axial planar cleavage is locally developed in decimetre 
scale folds of S1.  Both S1 and S2 foliations are considered to be Jurassic in age. Owing to their greater strength, 
bodies  of  secondary  dolostone  have  resisted  strain  and  foliation  development,  whereas  the  surrounding  limestone 
and  calc-phyllite  appear  in  places  to  have  been  attenuated  during  deformation.    This  deformation,  presumably 
Jurassic, complicates sedimentological interpretations. Potentially the earliest and most prominent structural feature 
in  the  resource  area  is  the  northeast-trending  Iron  Mountain  discontinuity  which  is  still  problematic  in  its 
interpretation.   

49 

 
 
Mineralization at Bornite occurs as tabular mineralized zones that coalesce into crudely stratiform bodies hosted in 
secondary dolomite. Two significant dolomitic horizons that host mineralization have been mapped by drilling and 
include: 1) the Lower Reef, a thick 100 to 300 m thick dolomitized zone lying immediately above the basal quartz 
phyllite  unit  of  the  Anirak  Schist;  and  2)  the  Upper  Reef,  a  100  to  150  m  thick  dolomite  horizon  roughly  300  m 
higher in section.     

The  Lower  Reef  dolomite  outcrops  along  the  southern  margin  of  the  Ruby  Creek  zone  and  is  spatially  extensive 
throughout the deposit area. It hosts a significant portion of the shallow resources in the Ruby Creek zone as well as 
higher grade resources down dip and to the northeast in the South Reef. The Upper Reef zone hosts relatively high-
grade  resources  to  the  north  in  the  Ruby  Creek  zone.  The  Upper  reef  zone  appears  to  lie  at  an  important  NE- 
trending facies transition to the NW of the main drilled area and locally appears to be at least partially thrust over the 
Lower Reef stratigraphy to the southeast.        

Drill  results  from  2013  show  dolomitization  and  copper  mineralization  in  the  Upper  and  Lower  Reefs  coalescing 
into a single horizon along the northern limits of current exploration. The NE- trending Ruby Creek and South Reef 
zones  also  coalesce  into  a  roughly  1000  m  wide  zone  of  >200  m  thick  dolomite  containing  significant  copper 
mineralization dipping north at roughly 5-10 degrees. 

Bornite Project – Mineralization 

Copper mineralization at Bornite is comprised of chalcopyrite, bornite, and chalcocite distributed in stacked, roughly 
stratiform zones exploiting favourable stratigraphy within the dolomitized limestone package. Mineralization occurs, 
in  order  of  increasing  grade,  as  disseminations,  irregular  and  discontinuous  stringer-style  veining,  breccia  matrix 
replacement,  and  stratiform  massive  sulphides.  The  distribution  of  copper  mineral  species  is  zoned  around  the 
bottom-centre  of  each  zone,  with  bornite-chalcocite-chalcopyrite  at  the  core  and  progressing  outward  to 
chalcopyrite-pyrite.  Additional  volumetrically  minor  copper  species  include  carrollite,  digenite,  tennantite-
tetrahedrite,  and  covellite.  Stringer  pyrite  and  locally  significant  sphalerite  occur  above  and  around  the  copper 
zones, while locally massive pyrite and sparse pyrrhotite occur in association with siderite alteration below copper 
mineralization in the Lower Reef. 

In addition to the copper mineralization, significant cobalt mineralization is found accompanying bornite-chalcocite 
mineralization.  Cobalt  occurs  with  high-grade  copper  as  both  carrollite  (Co2CuS4)  and  as  cobaltiferous  rims  on 
recrystallized pyrite grains.  

Appreciable silver values are also found with bornite-rich mineralization in the South Reef and Ruby Creek zones. 

Bornite Project – Exploration  

Exploration in and around the Bornite Project by Kennecott from 1957 to 1998 is summarized above. In addition to 
the  extensive  drilling  completed  during  the  more  than  40  year  tenure  of  Kennecott  in  the  district,  Kennecott 
completed  widespread  surface  geochemical  sampling,  regional  and  property  scale  mapping,  and  numerous 
geophysical surveys employing a wide variety of techniques. The majority of this data has been acquired by us and 
forms the basis for renewed exploration that targets Bornite-style mineralization in the Bornite carbonate sequence.   

NovaGold as the precursor company to us began to actively pursue an agreement to explore the Bornite Project with 
NANA in 2005 resulting in an initial airborne geophysical survey in 2006. Negotiations on the consolidation and 
exploration of the entire Ambler district continued for the next several years culminating in the NANA Agreement 
in October, 2011.   

With the NANA Agreement approaching completion, NovaGold initiated work in 2010 to begin to characterize the 
exploration potential and depositional controls by re-logging and re-analyzing select drill holes with a Niton portable 
x-ray fluorescence (“XRF”) to determine geochemical variability. In 2011, NovaGold began an initial drill program 
to verify the historical database and exploration potential and conducted additional geophysical surveys to provide 
better  targeting  tools  for  continued  exploration  in  the  district.  In  2012,  we  expanded  the  IP  geophysical  coverage 
completing  a  major  district-wide  survey  that  targeted  the  prospective  Bornite  Carbonate  sequence.  Subsequent 
resource drilling between 2011 and 2013 based on the exploration targeting is discussed in the  “Bornite Project - 
Mineral Resource Estimates” section below. 

50 

 
 
2006 NovaGold Exploration 

In 2006, NovaGold contracted Fugro Airborne Surveys to complete a detailed helicopter DIGHEM magnetic, EM 
and radiometric survey of the Cosmos Hills.  The survey covered a rectangular block approximately 18 km by 49 
km which totaled 2,852 line kilometres.  The survey was flown at 300 m line spacing with a line direction of N20E. 
The DIGHEM helicopter survey system produced detailed profile data of magnetics, EM responses and radiometrics 
(total count, uranium, thorium, and potassium) and was processed into maps of magnetics, discrete EM anomalies, 
EM apparent resistivity, and radiometric responses.   

2010 NovaGold Exploration 

In 2010, in anticipation of completing the NANA  Agreement, NANA granted NovaGold permission to begin low 
level exploration at Bornite; this consisted of re-logging and re-analyzing select drill holes using a Niton portable 
XRF. In addition to the 2010 re-logging effort, NovaGold contracted a consulting geophysicist, Lou O'Connor, to 
compile  a  unified  airborne  magnetic  map  for  the  Ambler  mining  district  from  Kennecott,  Alaska  DNR,  and 
NovaGold airborne geophysical surveys.  

2011 NovaGold Exploration 

In 2011, NovaGold contracted Zonge International Inc. (“Zonge”) to conduct both dipole-dipole complex resistivity 
induced polarization (“CRIP”) and natural source audio-magnetotelluric (“NSAMT”) surveys over the northern end 
of the prospect to develop tools for additional exploration targeting under cover to the north.   

NSAMT  data  were  acquired  along  two  lines  totaling  5.15  line-km,  with  one  line  oriented  generally  north-south 
through the centre of the survey area and one being the southernmost east-west line in the survey area. CRIP data 
were acquired on five lines: four east-west lines and one north-south line, for a total coverage of 14.1 line-km and 79 
collected  CRIP  stations.  The  initial  objective  of  the  survey  was  to  investigate  geological  structures  and  the 
distribution of sulphides possibly associated with copper mineralization.  

Results from the paired surveys  show  that  wide-spaced dipole-dipole resistivity is the  most effective technique to 
directly  target  the  mineralization  package.  Broad  low  resistivity  anomalies  reflecting  pyrite  haloes  and 
mineralization  appear  to  define  the  limits  of  the  fluid  package.  Well-defined  and  often  very  strong  chargeability 
anomalies are also present, but appear in part to be masked by phyllitic units which also have strong chargeability 
signatures. The NSAMT show similar resistivity features as the IP, but are less well resolved. 

2012 Trilogy Exploration 

In  light  of  the  success  of  the  2011  geophysical  program,  we  contracted  Zonge  to  conduct  a  major  district-wide 
dipole/dipole  IP  survey,  a  down-hole  IP  radial  array  survey  in  the  South  Reef  area,  and  an  extensive  physical 
property characterization study of the various lithologies to better interpret the existing historical geophysical data.  

Zonge completed 48 line km of 200 m dipole/dipole IP during 2012, infilling and expanding on the 2011 survey, and 
stretching across the most prospective part of the outcropping permissive Bornite Carbonate sequence. The results 
show a well-defined low resistivity area associated with mineralization and variable IP signatures attributed both to 
mineralization and the overlying Beaver Creek phyllite. Numerous target areas occur in the immediate Bornite area 
with lesser targets occurring in the Aurora Mountain and Pardner Hill areas and in the far east of the survey area. 
During the 2012 drill program at South Reef, a single drill hole was targeted on a low resistivity area approximately 
500 m to 600 m southeast of the South Reef mineralization trend. Although the drill hole intersected some dolomite 
alteration in the appropriate stratigraphy, no significant sulphides were encountered.  

In addition to the extensive ground IP survey, Zonge also completed 9 km of down-hole radial IP using an electrode 
placed in drill hole RC12-0197 to further delineate the trend and potential in and around the South Reef. In addition 
to  the  2012  ground  geophysical  surveys,  extensive  physical  property  data  including  resistivity,  chargeability, 
specific gravity, and magnetic susceptibility were captured for use in modelling the existing ground IP and gravity 
surveys, and the airborne EM and magnetic surveys.  

In addition to geophysical focused exploration, a district wide geologic map was compiled integrating Kennecott’s 
1970’s mapping of the Cosmos Hills with selective Trilogy mapping in 2012.    

51 

 
 
2013 Trilogy Exploration 

The emphasis of the 2013 program was to further validate and refine the 2012 geologic map of the Cosmos Hills. 
A deep penetrating soil and vegetation geochemical orientation survey was completed over the South Reef deposit, 
utilizing various partial leaches and pH methods. The initial, approximately 1 km, test lines suggest a good response 
for  several  of  the  partial  leaches  of  the  soils  but  little  response  in  the  vegetative  samples;  further  follow-up  is 
warranted to the north of the deposit into the Ambler lowlands.       

2014 Trilogy Exploration 

During  2014,  exploration  work  was  limited  to  a  re-logging  and  re-sampling  program  of  historical  Kennecott  drill 
core.  

2015 Trilogy Exploration 

As a follow-up to the 2013 field program, a deep penetrating soil and vegetation geochemical survey was extended 
north of the deposit into the Ambler lowlands. Trilogy geologists completed a lithogeochemical desktop study and a 
comprehensive  update  to  the  3D  lithology  model;  the  updated  domains  have  been  utilized  in  the  most  recent 
resource estimation. 

 Bornite Project – Drilling 

A total of 183 surface core holes and 51 underground core holes, totaling 78,147 m have been drilled, targeting the 
Bornite deposit during 21 different annual campaigns dating  from 1957 through 2013. All of the drill campaigns, 
with the exception of the 2011 NovaGold campaign and the 2012 and 2013 Trilogy campaigns were completed by 
Kennecott or their exploration subsidiary BCMC. All drill holes (except RC13-230 and RC13-232 which have been 
reserved for metallurgical studies) were utilized in the estimation of the current resource.  

Sprague  and  Henwood,  a  Pennsylvania-based  drilling  company,  completed  all  of  the  Kennecott  drilling,  with  the 
exception  of  the  1997  program  (three  drill  holes)  completed  by  Tonto  Drilling  Services,  Inc.  (a  NANA-Dynatech 
company). The 2011 thru 2013 NovaGold/Trilogy programs used Boart Longyear Company as the drill contractor. 

In  the  initial  years  of  drilling  at  Bornite,  Kennecott  relied  on  AX  core  (1.1875  in  or  30.2  mm  diameter),  but,  as 
drilling migrated towards deeper targets, a change to BX core (1.625 in or 41.3 mm diameter) was implemented to 
help  limit  deviation.  From  1966  to  1967,  drilling  activity  at  Bornite  moved  underground  and  EX  diameter  core 
(0.845  in  or  21.5  mm  diameter)  was  implemented  to  define  the  Ruby  Creek  Upper  Reef  zone  “No.1  Ore  Body”. 
Drilling activity moved back to the surface in 1968, and, from 1968 to 1972, BX core was most commonly drilled. 
In later years, core size increased to NX (2.125 in or 54.0 mm diameter) and finally, in 2011, core size increased to 
NQ (1.874 in or 47.6 mm diameter) and HQ (2.5 in or 63.5 mm diameter). Progressively larger diameter drill rods 
have been continually used over the years in an attempt to minimize drill hole deviations. 

There is only partial knowledge of specific drill core handling procedures used by Kennecott during their tenure at 
the Bornite Deposit. All of the drill data collected during the Kennecott drilling programs (1958 to 1997) was logged 
on paper drill logs, copies of which are stored in the Kennecott office in Salt Lake City, Utah. Electronic scanned 
copies of the paper logs, in PDF format, are held by Trilogy. Drill core was sawed or split with a splitter, with half 
core submitted to various assay labs and the remainder stored in the Kennecott core storage facility at the Bornite 
Deposit. In 1995, Kennecott entered the drill assay data, the geologic core logs, and the down hole collar survey data 
into  an  electronic  format.  In  2009,  NovaGold  geologists  verified  the  geologic  data  from  the  original  paper  logs 
against  the  Kennecott  electronic  format  and  then  merged  the  data  into  a  Microsoft™  SQL  database.  Sampling  of 
drill core by Kennecott and BCMC focused primarily on the moderate to high grade mineralized zones. Intervals of 
visible  sulphide  mineralization  containing  roughly  >0.5  to  1%  copper  were  selected  for  analysis  by  Union  Assay 
Office  Inc.  of  Salt  Lake  City,  Utah.    This  approach  left  numerous  intervals  containing  weak  to  moderate  copper 
mineralization  un-sampled  in  the  historic  drill  core.    During  the  2012  exploration  program,  we  began  sampling  a 
portion of this remaining drill core in select holes in the South Reef area.  Trilogy extended this sampling program to 
the Ruby Creek area in 2013 and 2014. 

Throughout our tenure at Bornite, the following core handling procedures have been implemented. Core is slung by 
helicopter, or transported by truck or ATV, from the drill rig to the core-logging facility. Upon delivery, geologists 
and  geotechnicians  open  and  inspect  the  core  boxes  for  any  irregularities.  They  first  mark  the  location  of  each 

52 

 
 
drilling block on the core box, and then convert footages on the blocks into metric equivalents. Geotechnicians or 
geologists measure the intervals (or “from/to”) for each box of core and include this information, together with the 
drill hole ID and box number, on a metal tag stapled to the end of each box. Geotechnicians then measure the core to 
calculate percent recovery and rock quality designation (“RQD”). RQD is the sum of the total length of all pieces of 
core over 12 cm in a run. The total length of core in each run is measured and compared to the corresponding run 
length to determine percent recovery. Core is then logged with lithology and visual alteration features captured on 
observed interval breaks. Mineralization data, including total sulphide (recorded as percent), sulphide type (recorded 
as  a  relative  amount),  and  gangue  and  vein  mineralogy  are  collected  for  each  sample  interval  with  an  average 
interval of approximately 2 m. Structural data is collected as point data. Geologists then mark sample intervals to 
capture each lithology or other geologically appropriate intervals.   Sample intervals of  core are typically between 
1 m  and  3  m  in  length  but  are  not  to  exceed  3  m  in  length.  Occasionally,  if  warranted  by  the  need  for  better 
resolution of geology or mineralization, smaller sample intervals have been employed. Geologists staple sample tags 
on the core boxes at the start of each sample interval, and mark the core itself with a wax pencil to designate sample 
intervals.  This sampling approach is considered sound and appropriate for this style of mineralization and alteration. 
Drill core is digitally photographed prior to sampling. Drill core is cut in  half  using diamond core  saws. Specific 
attention  to  core  orientation  is  maintained  during  core  sawing  to  ensure  that  representative  samples  are  obtained. 
One-half of the core is retained in the core box for storage on site, or at our Fairbanks warehouse, and the other half 
bagged and labeled for analysis. Samples are selected for specific gravity measurements.  

In 2013, 33 historic drill holes in the Ruby Creek area, and in 2014, 37 historic drill holes in the Ruby Creek Area 
were  re-logged,  re-sampled  and  re-assayed  as  these  holes  had  previously  only  been  selectively  sampled  by 
Kennecott. Entire holes were re-logged utilizing Trilogy protocols discussed above. Samples were submitted either 
as halfcore, where previously sampled, or whole core where un-sampled (this was done to ensure that a sufficient 
volume  of  material  was  provided  for  analysis).  Sample  intervals  were  matched  to  historic  intervals  whenever 
possible,  or  selected  to  reflect  Trilogy  sampling  procedures  described  above.  The  objectives  of  the  re-assay/re-
logging program were threefold: 1) to implement a QA/QC program on intervals previously sampled by Kennecott 
in order to confirm the validity of their results; 2) to identify additional lowergrade (0.2-0.5% copper), which was 
not previously sampled; and 3) to provide additional multi-element ICP data to assist in the geologic interpretation 
of the deposit. 

Bornite Project - Sample Preparation, Analyses and Security 

Sample preparation, analytical lab accreditation and security measures taken during historical Kennecott and BCMC 
programs are unknown to us; however,  we are not aware of any reason to suspect that any of these samples have 
been tampered with.  The 2011 to 2013 samples were either in the custody of NovaGold or Trilogy personnel or the 
assay laboratories at all times, and the chain of custody of the samples is well documented. 

Once drill core was sawed, one half was retained for future reference and the other half was sent to ALS Minerals 
(formerly  ALS  Chemex)  in  Vancouver  for  analyses.  Shipment  of  core  samples  from  the  Bornite  camp  occurred 
whenever backhaul capacity was available on the chartered aircraft, which was generally 5 to 6 days a week. Rice 
bags, containing two to four individual poly-bagged core samples, were marked and labeled with the ALS Minerals 
address,  project  name  (Bornite),  drill  hole  number,  bag  number,  and  sample  numbers  enclosed.  Rice  bags  were 
secured  with  a  pre-numbered  plastic  security  tie,  assembled  into  loads  for  transport  by  chartered  flights  on  a 
commercial airline to Fairbanks, and directly delivered by a contracted expeditor to the ALS Minerals preparation 
facility  in  Fairbanks.  In  addition  to  the  core  samples,  control  samples  were  inserted  into  the  shipments  at  the 
approximate  rate  of  one  standard,  one  blank  and  one  duplicate  per  17  core  samples.  Samples  were  logged  into  a 
tracking system on arrival at ALS Minerals, and weighed. Samples were then crushed, dried, and a 250 g split was 
pulverized to greater than 85% passing 75 µm. 

Gold assays in 2011 and 2012 were determined using fire analysis followed by an atomic absorption spectroscopy 
(“AAS”) finish; gold was not analyzed in 2013 or 2014. The lower detection limit was 0.005 ppm gold; the upper 
limit  was  10  ppm  gold.  An  additional  48-element  suite  was  assayed  by  inductively  coupled  plasma-mass 
spectrometry (“ICP-MS”) and ICP-AES methodologies, following a four acid digest. Over limit (>1.0%) copper and 
zinc analyses were completed by AA, following a four acid digest. 

ALS Minerals has attained International Organization for Standardization (ISO) 9001:2000 registration. In addition, 
the ALS Minerals laboratory in Vancouver is accredited to ISO 17025 by Standards Council of Canada for a number 
of specific test procedures including fire assay of gold by AA, ICP and gravimetric finish, multi-element ICP and 

53 

 
 
AA  assays  for  silver,  copper,  lead  and  zinc.    Trilogy  has  no  relationship  with  any  primary  or  check  assay  labs 
utilized. 

During 2012, 2013 and 2014, Trilogy staff performed continuous validation of the drill data; both while logging was 
in progress and after the field program was complete. Trilogy also retained independent consultant Caroline Vallat, 
P.Geo.  of  GeoSpark  Consulting  Inc.  to:  1)  import  digital  drill  data  to  the  master  database  and  conduct  QA/QC 
checks upon import, 2) conduct a QA/QC review of paired historical assays and Trilogy 2012, 2013 and 2014 re-
assays; 3) monitor an independent check assay program for the 2012, 2013, and 2014 campaigns; and 4) generate a 
QA/QC report for the 2012, 2013, and 2014 campaigns.   

Bornite Project - Mineral Resource Estimates 

The  mineral  resource  estimate  has  been  prepared  by  Bruce  M.  Davis,  FAusIMM,  BD  Resource  Consulting,  and 
Robert Sim, P.Geo., SIM Geological Inc., both “Independent Qualified Persons” as defined in NI 43-101. We have 
filed three previous NI 43-101 Technical  Reports on the Bornite Project dated March 18, 2014, February 5, 2013 
and July 18, 2012.  The effective date of this resource is April 19, 2016.   

The Bornite Project database comprises a total of 235 diamond drill (core) holes totaling 78,745 m; 174 holes target 
the  Ruby  Creek  zone  and  42  holes  target  the  South  Reef  zone.  The  remaining  19  holes  in  the  database  are 
exploratory in nature and test for satellite mineralization proximal to the Bornite Deposit.  The database contains a 
total of 29,262 samples that have been analyzed for copper content. During 2014, Trilogy geologists re-logged and 
sampled  37  Kennecott  drill  holes  comprising  approximately  13,000  meters  with  partial  or  no  assays.  The  new 
resource estimate incorporates the results from the 2014 field program as well as advancements to the 3D geological 
model completed during 2015.  

Mineralization in the Ruby Creek zone occurs as two discrete strata bound lenses: a Lower Reef which outcrops and 
dips approximately 10-15 degrees to the northeast; and an Upper Reef lying roughly 150+ meters above the Lower 
Reef  stratigraphy  and  which  includes  a  small  high-grade  zone  historically  referred  to  as  the  "No.1  Orebody"  by 
Kennecott.  Mineralization  is  hosted  by  a  Devonian  age  carbonate  sequence  containing  broad  zones  of  dolomite 
alteration  and  associated  sulfide  mineralization  including  bornite,  chalcopyrite,  and  chalcocite  occurring  as 
disseminations  and  vein  stockworks  as  well  as  crackle  and  mosaic  breccia  fillings  and  locally  massive  to  semi-
massive replacement bodies. The geological and assay database have been reviewed and audited by BDRC and SGI. 
It is of the opinion of BDRC and SGI that the current drilling information is sufficiently reliable to interpret with 
confidence  the  boundaries  for  copper  mineralization  and  that  the  assay  data  are  sufficiently  reliable  to  support 
mineral  resource  estimation.  That  estimation  utilizes  two-meter  compositing  of  assays  from  216  drill  holes 
completed between 1961 and 2013. Estimated blocks were 5 x 5 x 5 meters on a side. 

Sixty domains were established for the estimation, all of which were treated as hard boundaries with no mixing of 
data  between  the  domains.  A  series  of  carbonate  and  phyllite  lithology  domains  together  with  grade  probability 
shells  at  2%  copper  and  0.2%  copper  thresholds  were  used  to  constrain  the  estimates.  Visual  inspections  of  the 
probability shells show that they fit well with observed levels of bornite, chalcocite and chalcopyrite mineralization.  

Based on the interpreted local high-grade nature of the mineralization, both capping and outlier restriction strategies 
were  implemented to control  the influence of high-grade  mineralization in the resource  model. This  methodology 
removed approximately 3% of the contained copper in the Ruby Creek area and 7% of the contained copper in the 
South Reef area.  

A total of 5,366 samples containing specific gravity measurements were utilized to estimate densities in the block 
model. Specific  gravity values  were estimated into  model  blocks  using inverse distance squared  moving averages 
using the domains described previously.  

Copper grades in model blocks were estimated using ordinary kriging. A dynamic search orientation strategy was 
utilized,  during  both  grade  and  specific  gravity  interpolations,  which  is  controlled  by  the  interpreted  trends  of 
mineralization  in  the  Upper,  Lower  and  South  Reef  zones.  The  block  model  has  been  validated  through  a 
combination  of  visual  and  statistical  methods  to  ensure  that  the  grade  and  density  estimates  are  an  appropriate 
representation of the underlying sample data.  

The Bornite deposit comprises several zones of relatively continuous moderate- to high-grade copper mineralization 
that  extends  from  surface  to  depths  of  more  than  800  m  below  surface.    The  deposit  is  potentially  amenable  to  a 

54 

 
 
combination of open pit and underground extraction methods. It is important to recognize that these discussions of 
underground and surface mining parameters are used solely for the purpose of testing the “reasonable prospects for 
economic extraction,” and do not represent an attempt to estimate mineral reserves.  No mineral reserves have been 
calculated for the Bornite Project. 

Indicated  Mineral  Resources  includes  blocks  in  the  model  that  are  potentially  amenable  to  open  pit  extraction 
methods  and  are  delineated  by  drilling  with  holes  spaced  at  a  maximum  distance  of  75  meters,  and  exhibit  a 
relatively high degree of confidence in the grade and continuity of mineralization. Resources in the Inferred category 
require a minimum of one drill hole within a maximum distance of 100 m and exhibit reasonable confidence in the 
grade and continuity of mineralization. 

In  the  opinion  of  the  Qualified  Persons,  the  level  of  understanding  of  the  geologic  controls  that  influence  the 
distribution of copper mineralization at the Bornite Deposit is relatively good.  The drilling, sampling and validation 
practices utilized by Trilogy during the various campaigns have been conducted in a professional manner and adhere 
to  accepted  industry  standards.    The  confidence  in  older,  historic,  drilling  conducted  by  Kennecott  has  been 
demonstrated through a series of validation checks and, overall, the underlying database is considered sufficient for 
the estimation of Indicated and Inferred mineral resources. The mineral resources have been estimated in conformity 
with generally accepted CIM Estimation of Mineral Resources and Mineral Reserves Best Practices Guidelines and 
are  reported  in  accordance  with  the  Canadian  Securities  Administrators’  NI  43-101.    Mineral  resources  are  not 
mineral reserves and do not have demonstrated economic viability.  There is no certainty that all or any part of the 
mineral resource will be converted into mineral reserve. The estimate of mineral resources for the Bornite Project 
are summarized in, “Bornite Project – Mineral Resource Statement”. 

Bornite Project - Mineral Resource Statement 

Mineral Resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and 
Mineral Reserves. 

The Qualified Persons for the Mineral Resource estimate are Bruce Davis and Robert Sim, both Qualified Person’s 
independent of us. Mineral Resources for the Bornite Project are found in Table 7 and Table 8. 

Table 7: Indicated Resource Estimate for the Bornite Project  

See  “Cautionary  Note  to  United  States  Investors”  This  section  uses  the  term  “indicated  resources”.  We  advise 
United States investors that these terms are not recognized by the SEC. United States investors are cautioned not to 
assume that estimates of indicated mineral resources are economically minable, or will be upgraded into measured 
mineral resources. See “Risk Factors” and “Cautionary Note to United States Investors”. 

Type 

Cut-off  
(Cu %) 

M tonnes 

Grade 
(Cu %) 

Contained 
Metal  
(Mlbs Cu) 

In-Pit(2) 

0.5 

40.5 

1.02 

913 

Indicated 

Notes: 

1.  These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition 
Standards.  Mineral resources that are not mineral reserves do not have demonstrated economic 
viability.  See “Risk Factors” and “Cautionary Note to United States Investors.” 

2.  Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, 
mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% 
metallurgical recoveries and an average pit slope of 43 degrees. 

3.  Rounding as required by reporting guidelines may result in apparent summation differences 

between tonnes, grade and contained metal content. 

4.  Tonnage and grade measurements are in metric units.  Contained copper are reported as imperial 

pounds. 

5.  All amounts are stated in U.S. dollars unless otherwise noted. 

55 

 
 
 
 
Table 8: Inferred Resource Estimate for the Bornite Project  

See “Cautionary Note to United States Investors” This section uses the term “inferred resources”. We advise United 
States investors that these terms are not recognized by the SEC. The estimation of inferred resources involves far 
greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. 
United  States  investors  are  cautioned  not  to  assume  that  estimates  of  inferred  mineral  resources  exist,  are 
economically  minable,  or  will  be  upgraded  into  measured  or  indicated  mineral  resources.  See  “Risk  Factors”  and 
“Cautionary Note to United States Investors”. 

Type 

Cut-off  
(Cu %) 

M tonnes 

Grade 
(Cu %) 

Contained 
Metal  
(Mlbs Cu) 

Inferred 

In-Pit (2) 
Below-Pit (3) 

Total Inferred 

0.5 

1.5 

84.1 

57.8 

141.9 

0.95 

2.89 

1.74 

1,768 

3,683 

5,450 

Notes: 

1.  These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition 

Standards.  See “Risk Factors” and “Cautionary Note to United States Investors.” 

2.  Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, 
mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% 
metallurgical recoveries and an average pit slope of 43 degrees. 

3.  Mineral resources at a 1.5% cut-off are considered as potentially economically viable in an 

underground mining scenario based on an assumed projected copper price of $3.00/lb, underground 
mining costs of $65.00 per tonne, milling costs of $11.00 per tonne, G&A of $5.00 per tonne, and 
an average metallurgical recovery of 87%. 

4.  Rounding as required by reporting guidelines may result in apparent summation differences 

between tonnes, grade and contained metal content. 

5.  Tonnage and grade measurements are in metric units.  Contained copper are reported as imperial 

pounds. 

6.  All amounts are stated in U.S. dollars unless otherwise noted. 

There are no known factors related to environmental, permitting, legal, title, taxation, socio-economic, marketing or 
political issues which could materially affect the mineral resource. 

Bornite Project – Metallurgy 

Metallurgical testwork to date indicates that the Bornite Project can be treated using standard grinding and flotation 
methods to produce copper concentrates. Initial testing indicates copper recoveries of approximately 87% resulting 
in concentrate grades of approximately 28% copper with very low potential penalty elements. Further metallurgical 
testwork is warranted to test these assumptions. 

Bornite Project – Environmental Considerations  

The Bornite Project area includes NANA’s Bornite and ANCSA lands, the Ruby Creek drainage (a tributary of the 
Shungnak  River),  the  Shungnak  River  drainage,  and  portions  of  the  Ambler  Lowlands.  Since  2007,  baseline 
environmental  data  collection  has  occurred  in  the  area  including  archaeology,  aquatic  life  surveys,  sediment 
sampling,  wetlands  mapping,  surface  water  quality  sampling,  hydrology,  meteorological  monitoring,  and 
subsistence.  Additional  baseline  environmental  data  in  NANA’s  Bornite  and  ANCSA  lands,  the  Ruby  Creek 
drainage, the Shungnak River drainage, portions of the Ambler Lowlands, and downstream receiving environments 
will be required to support future mine design, development of an EIS, permitting, construction and operations. 

56 

 
 
  
 
 
Bornite Project – Mining Operations 

The Bornite Project is not currently in production; for contemplated exploration or development activities see below. 

Bornite Project – Exploration and Development Permitting  

Development  of  the  Bornite  Project  will  require  a  significant  number  of  permits  and  authorizations  from  state, 
federal,  and  regional  organizations.    Much  of  the  groundwork  to  support  a  successful  permitting  effort  must  be 
undertaken prior to submission of permit applications so that issues can be identified and resolved, baseline data can 
be  acquired,  and  regulators  and  stakeholders  can  become  familiar  with  the  proposed  project.  The  comprehensive 
permitting process for the Bornite Project can be divided into three categories: 

1.  Exploration  state/regional  permitting:  required  to  obtain  approval  for  drilling,  camp  operations, 

engineering, and environmental baseline studies.  

2.  Pre-application phase: conducted in conjunction  with engineering feasibility  studies.   This stage includes 
the collection of environmental baseline data and interaction with stakeholders and regulators to facilitate 
the development of a project that can be successfully permitted. 

3.  The National Environmental Policy Act phase: formal agency review of the Federal and State requirements 
for  public  and  agency  participation  to  determine  if  and  how  the  Bornite  Project  can  be  done  in  an 
acceptable manner. 

The permit review process  will determine the  number of  management plans required to address all aspects of the 
Project to ensure compliance with environmental design and permit criteria. Each plan will describe the appropriate 
environmental  engineering  standard  and  the  applicable  operations  requirements,  maintenance  protocols,  and 
response actions. 

Bornite Project – Current Activities 

Following  the  release  in  the  spring  of  2016  of  the  Bornite  Report,  we  focused  field  investigations  and  drilling 
activities  on  advancing  our  Arctic  Project  towards  pre-feasibility.  Field  work  at  the  Bornite  Project  consisted  of 
continued environmental baseline data collection and the completion of the LiDAR survey over the greater project 
area  initiated  in  2015.  We  continue  to  evaluate  geological  and  hydrogeological  data  to  support  internal  desktop 
evaluations and planning of future field investigations at the Bornite project. 

Item 3.  LEGAL PROCEEDINGS 

From time to time, we are a party to routine litigation and proceedings that are considered part of the ordinary course 
of  business.  We  are  not  aware  of  any  material  current,  pending,  or  threatened  litigation.  There  are  no  material 
proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial owner 
of more than 5% of our securities or any associate of any such director, officer or security holder is a party adverse 
to us or has a material interest adverse to us. 

Item 4.  MINE SAFETY DISCLOSURES  

Operations  are  subject  to  regulation  by  the  Federal  Mine  Safety  and  Health  Administration  (“MSHA”)  under  the 
Federal Mine Safety and Health Act of 1977 (the “Mine Act”).  At our current stage of exploration, we are not yet 
subject to MSHA.   

Companies required to file periodic reports under the Exchange  Act, that operate mines regulated under the Mine 
Act  are  required  to  make  certain  disclosures  pursuant  to  Section  1503(a)  of  Dodd-Frank.    We  have  nothing  to 
disclose pursuant to Section 1503(a) of Dodd-Frank for the fiscal year ended November 30, 2016.  

57 

 
 
 
PART II 

Item 5.  MARKET  FOR  REGISTRANT’S  COMMON  EQUITY,  RELATED  STOCKHOLDER 

MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES 

Price Range of Common Shares 

The  Trilogy  Shares  are  listed  on  the  TSX  and  the  NYSE-MKT  under  the  symbol  “TMQ”.  On  February  2,  2017, 
there were 1,507 holders of record of our shares, which does not include shareholders for which shares are held in 
nominee or street name. The following tables set out the market price range of the Common Shares on the TSX and 
NYSE-MKT for the two fiscal years prior to the date hereof.   

Fiscal Quarter 

Q1 2015 

Q2 2015 

Q3 2015 

Q4 2015 

Q1 2016 

Q2 2016 

Q3 2016 

Q4 2016 

December 2016 – February 2, 2017 

NYSE-MKT 

TSX (C$) 

High 

0.72 
0.74 
0.65 
0.55 
0.39 
0.86 
0.68 
0.85 
0.59 

Low 

0.41 
0.52 
0.35 
0.33 
0.15 
0.32 
0.44 
0.41 
0.44 

High 

0.90 
0.93 
0.80 
0.70 
0.55 
1.08 
0.86 
1.00 
0.80 

Low 

0.53 
0.65 
0.45 
0.41 
0.20 
0.43 
0.57 
0.59 
0.58 

On February 2, 2017, the closing price of our Common Shares on the TSX was CDN$0.66 per Common Share and 
on the NYSE-MKT was $0.50 per Common Share.  

Dividend Policy 

We have not declared or paid any dividends on our Common Shares.  Our current business plan requires that for the 
foreseeable future, any future earnings be reinvested to finance the growth and development of our business.  We 
will  not  declare  or  pay  any  dividends  until  such  time  as  our  cash  flow  exceeds  our  capital  requirements  and  will 
depend  upon,  among  other  things,  conditions  then  existing  including  earnings,  financial  condition,  restrictions  in 
financing arrangements, business opportunities and conditions and other factors, or our Board determines that our 
shareholders could make better use of the cash. 

 Securities Authorized for Issuance under Equity Compensation Plans 

The following table is as of February 2, 2017. 

Number of securities to be 
issued upon exercise of 
outstanding options, warrants 
and rights 

Weighted-average exercise 
price of outstanding options, 
warrants and rights 

Plan category 

Number of securities 
remaining available for future 
issuance under equity 
compensation plans (excluding 
securities reflected in column 
(a)) 

Equity 
plans 
security holders 

compensation 
by 

approved 

compensation 
Equity 
plans  not  approved  by 
security holders 

(a) 

9,191,526 

- 

Total 

9,191,526 

(b) 

$0.46 

- 

$0.46 

58 

(c) 

6,703,849 

- 

6,703,849 

 
 
 
 
 
 
 
   
 
Unregistered Sales of Equity Securities 

None. 

Repurchase of Securities 

During 2016, neither Trilogy nor any affiliate of Trilogy repurchased Trilogy Common Shares.  

Exchange Controls 

There  are  no  governmental  laws,  decrees  or  regulations  in  Canada  that  restrict  the  export  or  import  of  capital, 
including  foreign exchange controls, or that affect the remittance of dividends, interest  or other payments  to non-
resident holders of the securities of Trilogy, other than Canadian withholding tax.  

Certain Canadian Federal Income Tax Considerations for U.S. Holders 

The  following  is  a  general  summary  of  the  principal  Canadian  federal  income  tax  considerations  generally 
applicable  under  Income  Tax Act  (Canada)  (the  “Tax  Act”)  to  a  holder  of  Common  Shares,  each  of  whom,  at  all 
relevant times, for the purposes of the Tax Act, holds such Common Shares as capital property, deals at arm’s length 
with the Company, is not affiliated with the Company and, for purposes of the Tax Act, is not, and is not deemed to 
be, a resident of Canada and has not and will not use or hold or be deemed to use or hold the Common Shares in the 
course of carrying on business in Canada (a “Non-Resident Holder”).  Special rules, which are not discussed below, 
may apply to a non-resident of Canada that is an insurer which carries on business in Canada and elsewhere. 

The  Common  Shares  will  generally  be  considered  capital  property  to  a  Non-Resident  Holder  unless  either  (i)  the 
Non-Resident  Holder  holds  the  Common  Shares  in  the  course  of  carrying  on  a  business  of  buying  and  selling 
securities  or  (ii)  the  Non-Resident  Holder  has  acquired  the  Common  Shares  in  a  transaction  or  transactions 
considered to be an adventure or concern in the nature of trade. 

The term  “U.S. Holder,” for  the purposes of this  section,  means a Non-Resident Holder  who,  for purposes of the 
Canada-United  States  Income  Tax  Convention  (1980)  as  amended,  (the  “Convention”),  is  at  all  relevant  times  a 
resident  of  the  United  States  and  is  a  “qualifying  person”  within  the  meaning  of  the  Convention.    In  some 
circumstances, fiscally transparent entities (including limited liability companies) will be entitled to benefits under 
the  Convention.    U.S.  Holders  are  urged  to  consult  with  their  own  tax  advisors  to  determine  their  entitlement  to 
benefits under the Convention based on their particular circumstances.   

This summary is based on the current provisions of the Tax Act, the regulations thereunder (the “Regulations”), the 
current provisions of the Convention, counsel’s understanding of the current published administrative policies and 
assessing practices of the Canada Revenue Agency (the “CRA”) publicly available prior to the date hereof. 

This  summary  also  takes  into  account  all  specific  proposals  to  amend  the  Tax  Act  and  Regulations  publicly 
announced by or on behalf of the Minister of Finance (Canada) prior to the date hereof (collectively, the “Proposed 
Tax  Amendments”).    No  assurances  can  be  given  that  the  Proposed  Tax  Amendments  will  be  enacted  or  will  be 
enacted  as  proposed.    Other  than  the  Proposed  Tax  Amendments,  this  summary  does  not  take  into  account  or 
anticipate  any  changes  in  law  or  the  administration  policies  or  assessing  practice  of  CRA,  whether  by  judicial, 
legislative, governmental or administrative decision or action, nor does it take into account provincial, territorial or 
foreign income tax legislation or considerations, which may differ significantly from those discussed herein. 

This summary is of a general nature only and is not intended to be, nor should it be construed to be, legal or tax 
advice to any particular U.S. Holder and no representations with respect to the income tax consequences to any 
particular  U.S.  Holder  are  made.    This  summary  is  not  exhaustive  of  all  Canadian  federal  income  tax 
considerations.    Accordingly,  U.S.  Holders  should  consult  their  own  tax  advisors  with  respect  to  their  own 
particular circumstances. The discussion below is qualified accordingly. 

Currency Conversion 

Subject to certain exceptions that are not discussed herein, for purposes of the Tax Act, all amounts relating to the 
acquisition,  holding  or  disposition  of  Common  Shares,  including  dividends,  adjusted  cost  base  and  proceeds  of 
dispositions  must  be  determined  in  Canadian  dollars  using  the  daily  noon  rate  (or,  beginning  March  1,  2017,  the 

59 

 
 
  
 
 
single daily exchange rate) of the Bank of Canada on the particular date the particular amount arose or such other 
rate of exchange as acceptable to the CRA. 

Disposition of Common Shares 

A Non-Resident Holder will not be subject to tax under the Tax Act in respect of any capital gain realized by such 
Non-Resident Holder on a disposition of the Common Shares, nor will capital losses arising from the disposition be 
recognized under the Tax Act, unless the Common Shares constitute “taxable Canadian property” (as defined in the 
Tax Act) of the Non-Resident Holder at the time of disposition and the Non-Resident Holder is not entitled to relief 
under an applicable income tax treaty or convention.  As long as the shares are then listed on a “designated stock 
exchange”  (as  defined  in  the  Tax  Act)  (which  currently  includes  the  TSX  and  the  NYSE-MKT)  at  the  time  of 
disposition, the Common Shares generally will not constitute taxable Canadian property of a Non-Resident Holder, 
unless at any time during the 60-month period immediately preceding the disposition the following two conditions 
are not met concurrently: (i) the Non-Resident Holder, persons with whom the Non-Resident Holder did not deal at 
arm’s  length,  partnerships  in  which  the  taxpayer  or  persons  with  whom  the  taxpayer  did  not  deal  at  arm’s  length 
holds  a  membership  interest  directly  or  indirectly  through  one  or  more  partnerships,  or  the  Non-Resident  Holder 
together with all such persons, owned or was considered to own 25% or more of the issued shares of any class or 
series of shares of the capital stock of the Company; and (ii) more than 50% of the fair market value of the Common 
Shares  was  derived  directly  or  indirectly  from  one  or  any  combination  of  real  or  immovable  property  situated  in 
Canada, “Canadian resource properties” (as defined in the Tax Act), “timber resource properties” (as defined in the 
Tax Act) or a options in respect of, or interests in, or civil law rights in, such properties, whether or not it exists. 

If  the  Common  Shares  are  taxable  Canadian  property  to  a  Non-Resident  Holder,  any  capital  gain  realized  on  the 
disposition or deemed disposition of such shares, may not be subject to Canadian federal income tax pursuant to the 
terms  of  an  applicable  income  tax  treaty  or  convention  between  Canada  and  the  country  of  residence  of  a  Non-
Resident Holder, including the Convention. 

A Non-Resident Holder whose shares are taxable Canadian property should consult their own advisors. 

Dividends on Common Shares 

Under  the  Tax  Act,  dividends  on  shares  paid  or  credited  to  a  Non-Resident  Holder  will  be  subject  to  Canadian 
withholding  tax  at  the  rate  of  25%  of  the  gross  amount  of  the  dividends.    This  withholding  tax  may  be  reduced 
pursuant to the terms of an applicable income tax treaty or convention between Canada and the country of residence 
of a Non-Resident Holder.  Under the Convention, a U.S. Holder will generally be subject to Canadian withholding 
tax at a rate of 15% of the gross amount of such dividends (or 5% in the case of a U.S. Holder that is a company 
beneficially  owning  at  least  10%  of  the  Company’s  voting  shares).    In  addition,  under  the  Convention,  dividends 
may  be  exempt  from  Canadian  non-resident  withholding  tax  if  paid  to  certain  U.S.  Holders  that  are  qualifying 
religious,  scientific,  literary,  educational  or  charitable  tax-exempt  organizations  and  qualifying  trusts,  companies, 
organizations  or  arrangements  operated  exclusively  to  administer  or  provide  pension,  retirement  or  employee 
benefits  that  are  exempt  from  tax  in  the  United  States  and  that  have  complied  with  specific  administrative 
procedures. 

Certain U.S. Federal Income Tax Considerations 

The following is a general summary of certain anticipated U.S. federal income tax considerations applicable to a U.S. 
Holder (as defined below) arising from and relating to the acquisition, ownership and disposition of Common Shares. 

This summary is for general information purposes only and does not purport to be a complete analysis or listing of 
all  potential  U.S.  federal  income  tax  considerations  that  may  apply  to  a  U.S.  Holder  as  a  result  of  acquisition  of 
Common Shares.  Furthermore, this summary does not take into account the individual facts and circumstances of 
any particular U.S. Holder that may affect the U.S. federal income tax considerations applicable to such U.S. Holder 
of  Common  Shares.    Except  as  specified  below,  this  summary  does  not  discuss  applicable  tax  reporting 
requirements. Accordingly, this summary is not intended to be, and should not be construed as, legal or U.S. federal 
income tax advice with respect to any U.S. Holder.  U.S. Holders should consult their own tax advisors regarding the 
U.S. federal, U.S. state and local, and foreign tax consequences relating to the acquisition, ownership and disposition 
of Common Shares. 

60 

 
 
 
No  ruling  from  the  U.S.  Internal  Revenue  Service  (the  “IRS”)  or  legal  opinion  has  been  requested,  or  will  be 
obtained, regarding the potential U.S. federal income tax considerations applicable to U.S. Holders as discussed in 
this summary.  This summary is not binding on the IRS, and the IRS is not precluded from taking a position that is 
different from, and contrary to, the positions taken in this summary.  In addition, because the authorities on which 
this summary is based are subject to various interpretations, the IRS and the U.S. courts could disagree with one or 
more of the positions taken in this summary. 

Scope of this Summary 

Authorities 

This  summary  is  based  on  the  U.S.  Internal  Revenue,  as  amended  (“Code”),  regulations  promulgated  by  the 
Department of the Treasury (whether final, temporary or proposed) (“Treasury Regulations”), U.S. court decisions, 
published rulings and administrative positions of the IRS, and the Convention, that are applicable and, in each case, 
in effect as of the date of this document.  Any of the authorities on which this summary is based could be changed in 
a  material  and  adverse  manner  at  any  time,  and  any  such  change  could  be  applied  on  a  retroactive  or  prospective 
basis, which could affect the U.S. federal income tax considerations described in this summary. This summary does 
not discuss the potential effects, whether adverse or beneficial, of any proposed legislation that, if enacted, could be 
applied on a retroactive basis. 

U.S. Holders 

For purposes of this section, a “U.S. Holder” is a beneficial owner of Common Shares that, for U.S. federal income 
tax  purposes,  is  (a) an  individual  who  is  a  citizen  or  resident  of  the  United  States  for  U.S.  federal  income  tax 
purposes; (b) a corporation, or other entity classified as a corporation for U.S. federal income tax purposes, that is 
created or organized in or under the laws of the United States or any state in the United States, including the District 
of Columbia; (c) an estate if the income of such estate is subject to U.S. federal income tax regardless of the source 
of  such  income;  or  (d) a  trust  if  (i) such  trust  has  validly  elected  to  be  treated  as  a  U.S.  person  for  U.S.  federal 
income tax purposes, or (ii) a U.S. court is able to exercise primary supervision over the administration of such trust 
and one or more U.S. persons have the authority to control all substantial decisions of such trust. 

Non-U.S. Holders 

For purposes of this summary, a “Non-U.S. Holder” is a beneficial owner of Common Shares that is neither a U.S. 
Holder  nor  a  U.S.  partnership  (or  other  “pass-through”  entity).    This  summary  does  not  address  the  U.S.  federal 
income tax considerations applicable to Non-U.S. Holders relating to the acquisition, ownership and disposition of 
Common Shares.  Accordingly, Non-U.S. Holders should consult their own tax advisors regarding the U.S. federal, 
U.S. state and local, and  foreign  tax consequences (including the potential application of and operation of any tax 
treaties) relating to the acquisition, ownership, and disposition of Common Shares. 

U.S. Holders Subject to Special U.S. Federal Income Tax Rules Not Addressed 

This summary does not address the U.S. federal income tax considerations applicable to U.S. Holders that are subject 
to  special  provisions  under  the  Code,  including  (a) U.S.  Holders  that  are  tax-exempt  organizations,  qualified 
retirement  plans,  individual  retirement  accounts  or  other  tax-deferred  accounts;  (b) U.S.  Holders  that  are  financial 
institutions,  underwriters,  insurance  companies,  real  estate  investment  trusts  or  regulated  investment  companies  or 
that are broker-dealers, dealers, or traders in securities or currencies that elect to apply a mark-to-market accounting 
method;  (c) U.S.  Holders  that  have  a  “functional  currency”  other  than  the  U.S.  dollar;  (d) U.S.  Holders  that  own 
Common  Shares  as  part  of  a  straddle,  hedging  transaction,  conversion  transaction,  constructive  sale  or  other 
arrangement involving  more than one position; (e) U.S. Holders that acquired Common  Shares in connection  with 
the  exercise  of  employee  stock  options  or  otherwise  as  compensation  for  services;  (f) U.S.  Holders  that  hold 
Common Shares other than as a capital asset (generally property held for investment purposes) within the meaning of 
Section 1221 of the Code; or (g) U.S. Holders that own, directly, indirectly or by attribution, 10% or more, by voting 
power or value, of the outstanding shares of the Company.  The summary below also does not address the impact on 
persons  who  are  U.S.  expatriates  or  former  long-term  residents  of  the  United  States  subject  to  Section  877  of  the 
Code.    U.S.  Holders  and  others  that  are  subject  to  special  provisions  under  the  Code,  including  U.S.  Holders 
described immediately above, should consult their own tax advisors. 

61 

 
 
 
If an entity that is classified as a partnership (or other “pass-through” entity) for U.S. federal income tax purposes 
holds Common Shares, the U.S. federal income tax consequences applicable to such partnership (or “pass-through” 
entity) and the partners of such partnership (or owners of such “pass-through” entity) generally will depend on the 
activities of the partnership (or “pass-through” entity) and the status of such partners (or owners).  Partners of entities 
that  are  classified  as  partnerships  (and  owners  of  “pass-through”  entities)  for  U.S.  federal  income  tax  purposes 
should consult their own tax advisors regarding the U.S. federal income tax consequences relating to the acquisition, 
ownership and disposition of Common Shares. 

Tax Consequences Other than U.S. Federal Income Tax Consequences Not Addressed 

This  summary  does  not  address  the  U.S.  state  and  local,  U.S.  estate  and  gift,  U.S.  alternative  minimum  tax,  or 
foreign tax consequences to U.S. Holders relating to the acquisition, ownership, and disposition of Common Shares.  
Each  U.S.  Holder  should  consult  its  own  tax  advisor  regarding  the  U.S.  state  and  local,  U.S.  estate  and  gift,  U.S. 
federal alternative minimum tax and foreign tax consequences relating to the acquisition, ownership, and disposition 
of Common Shares. 

U.S. Federal Income Tax Consequences of the Acquisition, Ownership and Disposition of Common Shares  

Distributions on Common Shares  

Subject  to  the  PFIC  rules  discussed  below,  a  U.S.  Holder  that  receives  a  distribution,  including  a  constructive 
distribution,  with  respect  to  a  Common  Share  will  be  required  to  include  the  amount  of  such  distribution  in  gross 
income as a dividend (without reduction for any Canadian income tax withheld from such distribution) to the extent 
of  the  current  or  accumulated  “earnings  and  profits”  of  the  Company,  as  computed  for  U.S.  federal  income  tax 
purposes.    To  the  extent  that  a  distribution  exceeds  the  current  and  accumulated  “earnings  and  profits”  of  the 
Company,  such  distribution  will  be  treated  first  as  a  tax-free  return  of  capital  to  the  extent  of  a  U.S.  Holder’s  tax 
basis in the Common Shares and thereafter as a gain from the sale or exchange of such Common Shares (see “Sale or 
Other  Taxable  Disposition  of  Common  Shares”  below).    However,  the  Company  does  not  intend  to  maintain  the 
calculations  of  earnings  and  profits  in  accordance  with  U.S.  federal  income  tax  principles,  and  each  U.S.  Holder 
should  therefore  assume  that  any  distribution  by  the  Company  with  respect  to  the  Common  Shares  will  constitute 
ordinary dividend income.  Subject to applicable limitations, dividends paid by the Company to non-corporate U.S. 
Holders, including individuals, generally will be eligible for the preferential tax rates applicable to long-term capital 
gains for dividends, provided certain holding period and other conditions are satisfied, including that the Company 
not  be  classified  as  a  PFIC  (as  discussed  below)  in  the  tax  year  of  distribution  or  in  the  preceding  tax  year.  
Dividends received on Common Shares by corporate U.S. Holders  will  not be eligible for the “dividends received 
deduction”. The dividend rules are complex, and each U.S. Holder should consult its own tax advisor regarding the 
application of such rules. 

Sale or Other Taxable Disposition of Common Shares  

Subject  to  the  PFIC  rules  discussed  below,  upon  the  sale  or  other  taxable  disposition  of  Common  Shares  a  U.S. 
Holder generally will recognize capital gain or loss in an amount equal to the difference between (a) the amount of 
cash  plus  the  fair  market  value  of  any  property  received  and  (b)  its  tax  basis  in  such  Common  Shares  sold  or 
otherwise disposed of.  Such gain generally will be treated as “U.S. source” for purposes of applying the U.S. foreign 
tax credit rules unless the gain is subject to tax in Canada and is re-sourced as “foreign source” under the Convention 
and such U.S. Holder elects to treat such gain or loss as “foreign source” (see a more detailed discussion at “Foreign 
Tax Credit” below). Any such gain or loss generally will be capital gain or loss, which will be long-term capital gain 
or  loss  if,  at  the  time  of  the  sale  or  other  disposition,  such  Common  Shares  are  held  for  more  than  one  year.  
Preferential tax rates apply to long-term capital gains of a U.S. Holder that is an individual, estate, or trust.  There are 
currently no preferential tax rates for long-term capital gains of a U.S. Holder that is a corporation.  Deductions for 
capital losses are subject to significant limitations under the Code. 

Foreign Tax Credit 

A U.S. Holder who pays (whether directly or through withholding) Canadian income tax with respect to dividends 
paid on the Common Shares generally may elect to deduct or credit such tax.  This election is made on a year-by-
year basis and applies to all foreign taxes paid (whether directly or through withholding) by a U.S. Holder during a 
year. 

62 

 
 
Complex limitations apply to the foreign tax credit, including the general limitation that the credit cannot exceed the 
proportionate  share  of  a  U.S.  Holder’s  U.S.  federal  income  tax  liability  that  such  U.S.  Holder’s  “foreign  source” 
taxable income bears to such U.S. Holder’s worldwide taxable income.  In applying this limitation, a U.S. Holder’s 
various items of income and deduction must be classified, under complex rules, as either “foreign source” or “U.S. 
source”.  In addition, this limitation is calculated separately with respect to specific categories of income.  Dividends 
paid by the Company generally will constitute “foreign source” income and generally will be categorized as “passive 
category  income”.  However,  and  subject  to  certain  exceptions,  a  portion  of  the  dividends  paid  by  a  foreign 
corporation will be treated as U.S. source income for United States foreign tax credit purposes, in proportion to its 
U.S. source earnings and profits, if United States persons own, directly or indirectly, 50 percent or more of the voting 
power  or  value  of  the  foreign  corporation’s  shares.  A  portion  of  any  dividends  paid  with  respect  to  the  Common 
Shares may be treated as U.S. source income under these rules, which may limit the ability of a U.S. Holder to claim 
a foreign tax credit for any Canadian withholding taxes payable in respect of such amount. Because the foreign tax 
credit rules are complex, U.S. Holders should consult their own tax advisors regarding the foreign tax credit rules, 
including the source of any dividends paid to U.S. Holders. 

Subject to certain specific rules, foreign income and withholding taxes paid with respect to any distribution in respect 
of  stock  in  a  PFIC  should  qualify  for  the  foreign  tax  credit.    The  rules  relating  to  distributions  by  a  PFIC  are 
complex, and a U.S. Holder should consult with its own tax advisor with respect to any distribution received from a 
PFIC.  

Receipt of Foreign Currency 

The  amount  of  any  distribution  paid  in  foreign  currency  to  a  U.S.  Holder  in  connection  with  the  ownership  of 
Common Shares, or on the sale, exchange or other taxable disposition of Common Shares, generally will be equal to 
the  U.S.  dollar  value  of  such  foreign  currency  based  on  the  exchange  rate  applicable  on  the  date  of  actual  or 
constructive receipt (regardless of whether such foreign currency is converted into U.S. dollars at that time).  If the 
foreign currency received is not converted into U.S. dollars on the date of receipt, a U.S. Holder will have a basis in 
the  foreign  currency  equal  to  its  U.S.  dollar  value  on  the  date  of  receipt.    A  U.S.  Holder  that  receives  foreign 
currency and converts such foreign currency into U.S. dollars at a conversion rate other than the rate in effect on the 
date of receipt may have a foreign currency exchange gain or loss, which generally would be treated as U.S. source 
ordinary income or loss for foreign tax credit purposes.  Different rules apply to U.S. Holders who use the accrual 
method of tax accounting. U.S. Holders should consult their own U.S. tax advisors regarding the U.S. federal income 
tax consequences of receiving, owning and disposing of foreign currency. 

Additional Tax on Passive Income 

Individuals,  estates  and  certain  trusts  whose  income  exceeds  certain  thresholds  will  be  required  to  pay  a  3.8% 
Medicare surtax on “net investment income” including, among other things, dividends and net gain from disposition 
of property (other than property held in certain trades or businesses). U.S. Holders should consult with their own tax 
advisors regarding the effect, if any, of this tax on their ownership and disposition of Common Shares. 

Passive Foreign Investment Company Rules 

If  the  Company  is  considered  a  PFIC  within  the  meaning  of  Section  1297  of  the  Code  at  any  time  during  a  U.S. 
Holder’s holding period, then certain different and potentially adverse tax consequences would apply to such U.S. 
Holder’s acquisition, ownership and disposition of Common Shares. 

PFIC Status of the Company 

The Company generally will be a PFIC if, for a given tax year, (a) 75% or more of the gross income of the Company 
for such tax year is passive income or (b) 50% or more of the assets held by the Company either produce passive 
income  or  are  held  for  the  production  of  passive  income,  based  on  the  fair  market  value  of  such  assets.    “Gross 
income”  generally  includes  all  revenues  less  the  cost  of  goods  sold  plus  income  from  investments  and  from 
incidental or outside operations or sources, and “passive income” includes, for example, dividends, interest, certain 
rents  and  royalties,  certain  gains  from  the  sale  of  stock  and  securities,  and  certain  gains  from  commodities 
transactions.  Active business gains arising from the sale of commodities generally are excluded from passive income 
if substantially all (85% or more) of a foreign corporation’s commodities are stock in trade or inventory, depreciable 
property used in a trade or business, or supplies regularly used or consumed in a trade or business, and certain other 
requirements are satisfied. 

63 

 
 
For purposes of the PFIC income test and asset test described above, if the  Company owns, directly or indirectly, 
25% or more of the total value of the outstanding shares of another corporation, the Company will be treated as if it 
(a) held a proportionate share of the assets of such other corporation and (b) received directly a proportionate share 
of the income of such other corporation.  In addition, for purposes of the PFIC income test and asset test described 
above, “passive income” does not include any interest, dividends, rents or royalties that are received or accrued by 
the  Company  from  a  “related  person”  (as  defined  in  Section  954(d)(3)  of  the  Code),  to  the  extent  such  items  are 
properly allocable to the income of such related person that is not passive income. 

Under certain attribution rules, if the Company is a PFIC, U.S. Holders will be deemed to own their proportionate 
share  of  any  subsidiary  of  the  Company  which  is  also  a  PFIC  (a  “Subsidiary  PFIC”),  and  will  be  subject  to  U.S. 
federal  income  tax  on  (a)  a  distribution  on  the  shares  of  a  Subsidiary  PFIC  and  (b)  a  disposition  of  shares  of  a 
Subsidiary PFIC, both as if the U.S. Holder directly held the shares of such Subsidiary PFIC. 

The Company believes that it was not a PFIC for the tax years ended November 30, 2014, 2015, and 2016, but may 
be  a  PFIC  in  future  tax  years.  No  opinion  of  legal  counsel  or  ruling  from  the  IRS  concerning  the  status  of  the 
Company  as  a  PFIC  has  been  obtained  or  is  currently  planned  to  be  requested.  The  determination  of  whether  the 
Company (or a subsidiary of the Company) was, or will be, a PFIC for a tax year depends, in part, on the application 
of  complex  U.S.  federal  income  tax  rules,  which  are  subject  to  differing  interpretations.    In  addition,  whether  the 
Company (or subsidiary)  will be a PFIC for any  tax  year  depends on the assets and income of the Company (and 
each such subsidiary) over the course of each such tax year and, as a result, cannot be predicted with certainty as of 
the date of this document.  Accordingly, there can be no assurance that the IRS will not challenge any determination 
made by the Company (or subsidiary) concerning its PFIC status or that the Company (and any subsidiary) was not, 
or will not be, a PFIC for any tax year.  U.S. Holders should consult their own tax advisors regarding the PFIC status 
of the Company and any subsidiary of the Company. 

Default PFIC Rules under Section 1291 of the Code 

If the Company is a PFIC, the U.S. federal income tax consequences to a U.S. Holder of the acquisition, ownership 
and  disposition  of  Common  Shares  will  depend  on  whether  such  U.S.  Holder  makes  a  QEF  election  or  makes  a 
mark-to-market  election  under  Section 1296  of  the  Code  (a  “Mark-to-Market  Election”)  with  respect  to  Common 
Shares.  A U.S. Holder that does not make either a QEF Election or a Mark-to-Market Election will be referred to in 
this summary as a “Non-Electing U.S. Holder”. 

A  Non-Electing  U.S.  Holder  will  be  subject  to  the  rules  of  Section 1291  of  the  Code  with  respect  to  (a) any  gain 
recognized on the sale or other taxable disposition of  Common Shares and (b) any excess distribution paid on the 
Common  Shares.    A  distribution  generally  will  be  an  “excess  distribution”  to  the  extent  that  such  distribution 
(together  with  all  other  distributions  received  in  the  current  tax  year)  exceeds  125%  of  the  average  distributions 
received during the three preceding tax years (or during a U.S. Holder’s holding period for the Common Shares, if 
shorter). 

If  the  Company  is  a  PFIC,  under  Section  1291  of  the  Code  any  gain  recognized  on  the  sale  or  other  taxable 
disposition  of  Common  Shares  (including  an  indirect  disposition  of  shares  of  a  Subsidiary  PFIC),  and  any  excess 
distribution paid on Common Shares (or a distribution by a Subsidiary PFIC to its shareholder that is deemed to be 
received by a U.S. Holder) must be ratably allocated to each day of a Non-Electing U.S. Holder’s holding period for 
the Common Shares.  The amount of any such gain or excess distribution allocated to the tax year of disposition or 
excess distribution and to years before the Company became a PFIC, if any, would be taxed as ordinary income.  The 
amounts allocated to any other tax year would be subject to U.S. federal income tax at the highest tax applicable to 
ordinary income in each such year, and an interest charge would be imposed on the tax liability for each such year, 
calculated  as  if  such  tax  liability  had  been  due  in  each  such  year.    A  Non-Electing  U.S.  Holder  that  is  not  a 
corporation must treat any such interest paid as “personal interest”, which is not deductible. 

If  the  Company  is  a  PFIC  for  any  tax  year  during  which  a  Non-Electing  U.S.  Holder  holds  Common  Shares,  the 
Company will continue to be treated as a PFIC with respect to such Non-Electing U.S. Holder, regardless of whether 
the Company ceases to be a PFIC in one or more subsequent years.  If the Company ceases to be a PFIC, a Non-
Electing  U.S.  Holder  may  terminate  this  deemed  PFIC  status  with  respect  to  Common  Shares  by  electing  to 
recognize  gain  (which  will  be  taxed  under  the  rules  of  Section 1291  of  the  Code  discussed  above)  as  if  such 
Common Shares were sold on the last day of the last tax year for which the Company was a PFIC.   

64 

 
 
Under proposed Treasury  Regulations, if a U.S. Holder has an option,  warrant or other  right to acquire stock of a 
PFIC, such option, warrant or right is considered to be PFIC stock subject to the default rules of Section 1291 of the 
Code.  Under rules described below, if the Company was a PFIC, the holding period for the option, warrant or other 
right  would begin on the day after the date a U.S. Holder acquired the option, warrant or other right.  This  would 
impact the availability of the QEF Election and Mark-to-Market Election with respect to an option, warrant or other 
right.  Thus, a U.S. Holder would have to account for an option, warrant or other right and Common Shares under the 
PFIC  rules  and  the  applicable  elections  differently  (see  discussion  below  under  “QEF  Election”  and  “Market-to-
Market Election”.) 

QEF Election 

In  the  event  the  Company  is  a  PFIC  and  a  U.S.  Holder  makes  a  QEF  Election  for  the  first  tax  year  in  which  its 
holding  period  of  its  Common  Shares  begins,  such  U.S.  Holder  generally  will  not  be  subject  to  the  rules  of 
Section 1291 of the Code discussed above with respect to its Common Shares.  However, a U.S. Holder that makes a 
QEF Election will be subject to U.S. federal income tax on such U.S. Holder’s pro rata share of (a) the net capital 
gain  of  the  Company,  which  will  be  taxed  as  long-term  capital  gain  to  such  U.S.  Holder,  and  (b) the  ordinary 
earnings of the Company, which will be taxed as ordinary income to such U.S. Holder.  Generally, “net capital gain” 
is the excess of (a) net long-term capital gain over (b) net  short-term capital  gain, and  “ordinary earnings” are the 
excess  of  (a)  “earnings  and  profits”  over  (b) net  capital  gain.    A  U.S.  Holder  that  makes  a  QEF  Election  will  be 
subject to U.S. federal income tax on such amounts for each tax year in which the Company is a PFIC, regardless of 
whether such amounts are actually distributed to such U.S. Holder by the Company.  However, a U.S. Holder that 
makes a QEF Election may, subject to certain limitations, elect to defer payment of current U.S. federal income tax 
on such amounts, subject to an interest charge.  If such U.S. Holder is not a corporation, any such interest paid will 
be treated as “personal interest”, which is not deductible. 

A U.S. Holder that makes a QEF Election generally (a) may receive a tax-free distribution from the Company to the 
extent  that  such  distribution  represents  “earnings  and  profits”  of  the  Company  that  were  previously  included  in 
income  by  the  U.S.  Holder  because  of  such  QEF  Election  and  (b) will  adjust  such  U.S.  Holder’s  tax  basis  in  the 
Common Shares to reflect the amount included in income or allowed as a tax-free distribution because of such QEF 
Election.  In addition, a U.S. Holder that makes a QEF Election generally will recognize capital gain or loss on the 
sale or other taxable disposition of Common Shares. 

The procedure for making a QEF Election, and the U.S. federal income tax consequences of making a QEF Election, 
will depend on whether such QEF Election is timely.  A QEF Election will be treated as “timely” if it is made for the 
first year in the U.S. Holder’s holding period for the Common Shares in which the Company was a PFIC.  A U.S. 
Holder may  make a timely QEF Election by  filing the appropriate QEF Election documents at the time  such U.S. 
Holder files a U.S. federal income tax return for such year. 

A  QEF  Election  will  apply  to  the  tax  year  for  which  such  QEF  Election  is  made  and  to  all  subsequent  tax  years, 
unless such QEF Election is invalidated or terminated or the IRS consents to revocation of such QEF Election.  If a 
U.S.  Holder  makes  a  QEF  Election  and,  in  a  subsequent  tax  year,  the  Company  ceases  to  be  a  PFIC,  the  QEF 
Election will remain in effect (although it will not be applicable) during those tax years in which the Company is not 
a PFIC.  Accordingly, if the Company becomes a PFIC in a subsequent tax year, the QEF Election will be effective, 
and  the  U.S.  Holder  will  be  subject  to  the  QEF  rules  described  above  during  a  subsequent  tax  year  in  which  the 
Company qualifies as a PFIC. 

As discussed above, under proposed Treasury Regulations, if a U.S. Holder has an option, warrant or other right to 
acquire stock of a PFIC, such option, warrant or right is considered to be PFIC stock subject to the default rules of 
Section 1291 of the Code on its disposition.  However, a holder of an option, warrant or other right to acquire stock 
of a PFIC may not make a QEF Election that will apply to the option, warrant or other right to acquire PFIC stock.  
In addition, under proposed Treasury Regulations, if a U.S. Holder holds an option, warrant or other right to acquire 
stock  of  a  PFIC,  the  holding  period  with  respect  to  shares  of  stock  of  the  PFIC  acquired  upon  exercise  of  such 
option, warrant or other right will include the period that the option, warrant or other right was held.  U.S. Holders 
should consult their own tax advisors regarding the application of the PFIC rules to Common Shares. 

The Company will make available to U.S. Holders, upon their written request, timely and accurate information as to 
its status as a PFIC, and will provide to a U.S. Holder all information and documentation that a U.S. Holder making a 
QEF  Election  with  respect  to  the  Company,  and  any  Subsidiary  PFIC  in  which  the  Company  owns,  directly  or 
indirectly,  more  than  50%  of  such  Subsidiary  PFIC’s  total  aggregate  voting  power,  is  required  to  obtain  for  U.S. 

65 

 
 
federal income tax purposes in the event it is a PFIC. However, U.S. Holders should be aware that the Company can 
provide  no  assurances  that  it  will  provide  any  such  information  relating  to  any  Subsidiary  PFIC,  in  which  the 
Company owns, directly or indirectly, 50% or less of such Subsidiary PFIC’s aggregate voting power.  Because the 
Company  may  own  shares  in  one  or  more  Subsidiary  PFICs,  and  may  acquire  shares  in  one  or  more  Subsidiary 
PFICs in the future, they will continue to be subject to the rules discussed above with respect to the taxation of gains 
and excess distributions with respect to any Subsidiary PFIC for which the U.S. Holders do not obtain the required 
information.  U.S. Holders should consult their tax advisor regarding the availability of, and procedure for making, a 
QEF Election with respect to the Company and any Subsidiary PFIC. 

Mark-to-Market Election 

A  U.S.  Holder  may  make  a  Mark-to-Market  Election  only  if  the  Common  Shares  are  marketable  stock.    The 
Common  Shares  generally  will  be  “marketable  stock”  if  they  are  regularly  traded  on  (a) a  national  securities 
exchange that is registered with the SEC; (b) the national market system established pursuant to section 11A of the 
Securities  and  Exchange  Act  of  1934;  or  (c) a  foreign  securities  exchange  that  is  regulated  or  supervised  by  a 
governmental  authority  of  the  country  in  which  the  market  is  located,  provided  that  (i) such  foreign  exchange  has 
trading volume, listing, financial disclosure and other requirements and the laws of the country in which such foreign 
exchange  is  located,  together  with  the  rules  of  such  foreign  exchange,  ensure  that  such  requirements  are  actually 
enforced; and (ii) the rules of such foreign exchange ensure active trading of listed stocks.  If such stock is traded on 
such  a  qualified  exchange  or  other  market,  such  stock  generally  will  be  “regularly  traded”  for  any  calendar  year 
during  which  such  stock  is  traded,  other  than  in  de  minimis  quantities,  on  at  least  15  days  during  each  calendar 
quarter.  Each  U.S.  Holder  should  consult  its  own  tax  advisor  regarding  whether  the  Common  Shares  constitute 
marketable stock. 

A  U.S.  Holder  that  makes  a  Mark-to-Market  Election  with  respect  to  its  Common  Shares  generally  will  not  be 
subject to the rules of Section 1291 of the Code discussed above.  However, if a U.S. Holder does not make a Mark-
to-Market Election beginning in the first tax year of such U.S. Holder’s holding period for Common Shares or such 
U.S. Holder has not made a timely QEF Election, the rules of Section 1291 of the Code discussed above will apply to 
certain dispositions of, and distributions on, the Common Shares.  

A U.S. Holder that makes a Mark-to-Market Election will include in ordinary income, for each tax year in which the 
Company is a PFIC, an amount equal to the excess, if any, of (a) the fair market value of the Common Shares, as of 
the close of such tax year over (b) such U.S. Holder’s tax basis in such Common Shares.  A U.S. Holder that makes a 
Mark-to-Market  Election  will  be  allowed  a  deduction  in  an  amount  equal  to  the  excess,  if  any,  of  (i) such  U.S. 
Holder’s adjusted tax basis in the Common Shares over (ii) the fair market value of such Common Shares (but only 
to the extent of the net amount of previously included income as a result of the Mark-to-Market Election for prior tax 
years). 

U.S. Holders that make a Mark-to-Market Election generally also will adjust their tax basis in the Common Shares to 
reflect the amount included in gross income or allowed as a deduction because of such Mark-to-Market Election.  In 
addition, upon a sale or other taxable disposition of Common Shares, a U.S. Holder that  makes a Mark-to-Market 
Election  will  recognize  ordinary  income  or  loss  (not  to  exceed  the  excess,  if  any,  of  (a) the  amount  included  in 
ordinary  income  because  of  such  Mark-to-Market  Election  for  prior  tax  years  over  (b) the  amount  allowed  as  a 
deduction because of such Mark-to-Market Election for prior tax years). 

A  Mark-to-Market  Election  applies  to  the  tax  year  in  which  such  Mark-to-Market  Election  is  made  and  to  each 
subsequent tax year, unless the Common Shares cease to be “marketable stock” or the IRS consents to revocation of 
such election.  U.S. Holders should consult their own tax  advisors regarding the availability of, and procedure for 
making, a Mark-to-Market Election. 

Although  a  U.S.  Holder  may  be  eligible  to  make  a  Mark-to-Market  Election  with  respect  to  Common  Shares,  no 
such election may be made with respect to the stock of any Subsidiary PFIC that a U.S. Holder is treated as owning 
because  such  stock  is  not  marketable.    Hence,  the  Mark-to-Market  Election  will  not  be  effective  to  eliminate  the 
interest charge described above with respect to deemed dispositions of Subsidiary PFIC stock or distributions from a 
Subsidiary PFIC. 

66 

 
 
Other PFIC Rules 

Under  Section 1291(f)  of  the  Code,  the  IRS  has  issued  proposed  Treasury  Regulations  that,  subject  to  certain 
exceptions,  would  cause  a  U.S.  Holder  that  had  not  made  a  timely  QEF  Election  to  recognize  gain  (but  not  loss) 
upon certain transfers of Common Shares that would otherwise be tax-deferred (e.g., gifts and exchanges pursuant to 
corporate  reorganizations)  in  the  event  the  Company  is  a  PFIC  during  such  U.S.  Holder’s  holding  period  for  the 
relevant shares.  However, the specific U.S. federal income tax consequences to a U.S. Holder may vary based on the 
manner in which Common Shares are transferred. 

Certain  additional  adverse  rules  will  apply  with  respect  to  a  U.S.  Holder  if  the  Company  is  a  PFIC,  regardless  of 
whether such U.S. Holder makes a QEF Election.  For example, under Section 1298(b)(6) of the Code, a U.S. Holder 
that uses Common Shares as security for a loan will, except as may be provided in Treasury Regulations, be treated 
as having made a taxable disposition of such Common Shares.  

In any year in which the Company is classified as a PFIC, a U.S. Holder will be required to file an annual report with 
the IRS containing such information as Treasury Regulations and/or other IRS guidance may require.  U.S. Holders 
should consult their own tax advisors regarding the requirements of filing such information returns under these rules, 
including the requirement to file an IRS Form 8621. 

In addition, a U.S. Holder who acquires Common Shares from a decedent will not receive a “step up” in tax basis of 
such Common Shares to fair market value unless such decedent had a timely and effective QEF Election in place. 

Special rules also apply to the amount of foreign tax credit that a U.S. Holder may claim on a distribution from a 
PFIC. 

The PFIC rules are complex, and U.S. Holders should consult their own tax advisors regarding the PFIC rules and 
how  they  may  affect  the  U.S.  federal  income  tax  consequences  of  the  acquisition,  ownership,  and  disposition  of 
Common  Shares  in  the  event  the  Company  is  a  PFIC  at  any  time  during  such  holding  period  for  such  Common 
Shares. 

Information Reporting, Backup Withholding Tax 

Certain U.S. Holders are required to report information relating to an interest in Common Shares subject to certain 
exceptions (including an exception for Common Shares held in accounts maintained by certain financial institutions), 
by attaching a completed IRS Form 8938, Statement of Specified Foreign Financial Assets, with their tax return for 
each  year  in  which  they  hold  an  interest  in  Common  Shares.    U.S.  Holders  are  urged  to  consult  their  own  tax 
advisors regarding information reporting requirements relating to their ownership of Common Shares. 

Payments made within the United States, or by a U.S. payor or U.S. middleman, of dividends on Common Shares, 
and  proceeds  arising  from  certain  sales  or  other  taxable  dispositions  of  Common  Shares,  may  be  subject  to 
information reporting and backup withholding tax, at the rate of 28%, if a U.S. Holder (a) fails to furnish such U.S. 
Holder’s correct U.S. social security or other taxpayer identification number (generally on Form W-9); (b) furnishes 
an  incorrect  U.S.  taxpayer  identification  number;  (c) is  notified  by  the  IRS  that  such  U.S.  Holder  has  previously 
failed to properly report items subject to backup withholding tax; or (d) fails under certain circumstances to certify, 
under penalty of perjury, that such U.S. Holder has furnished its correct U.S. taxpayer identification number and that 
the IRS has not notified such U.S. Holder that it is subject to backup withholding tax.  However, U.S. Holders that 
are  corporations  generally  are  excluded  from  these  information  reporting  and  backup  withholding  tax  rules.    Any 
amounts withheld under the U.S. backup withholding tax rules will be allowed as a credit against a U.S. Holder’s 
U.S.  federal  income  tax  liability,  if  any,  or  will  be  refunded,  if  such  U.S.  Holder  timely  furnishes  the  required 
information to the IRS.  U.S. Holders should consult their own tax advisors regarding the information reporting and 
backup withholding tax rules. 

67 

 
 
Item 6.  SELECTED FINANCIAL DATA 

The selected financial data in the table below have been selected in part, from our consolidated financial statements, 
which  have  been  prepared  in  accordance  with  accounting  principles  generally  accepted  in  the  United  States.  The 
selected  financial  data  should  be  read  in  conjunction  with  those  consolidated  financial  statements  and  the  notes 
thereto.  

in thousands of dollars, except per share amounts 

Results of operations 
Loss and comprehensive loss for the 

period 

Basic and diluted loss per share 

Financial position 
Working capital  
Total assets 
Total long-term liabilities 
Shareholders’ equity 

2016 
$ 

4,862 

0.05 

15,056 
46,747 
- 
46,154 

Year ended November 30 
2014 
$ 

2015 
$ 

2013 
$ 

2012 
$ 

9,532 

0.12 

16,134 
51,181 
- 
50,430 

9,648 

24,394 

 31,018 

0.17 

0.47 

0.67 

4,846 
36,826 
-  
35,847 

5,423 
38,899 
- 
37,157 

21,190 
55,696 
- 
53,723 

68 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Item 7.  MANAGEMENT’S  DISCUSSION  AND  ANALYSIS  OF  FINANCIAL  CONDITION  AND 

RESULTS OF OPERATIONS 

Trilogy Metals Inc. 
(An Exploration-Stage Company) 

Management’s Discussion and Analysis 
For the Fourth Quarter and Year Ended November 30, 2016 
(expressed in US dollars) 

General 

This  Management’s  Discussion  and  Analysis  (“MD&A”)  of  Trilogy  Metals  Inc.  (“Trilogy”,  “the  Company”  or 
“we”)  is  dated  February  2,  2017  and  provides  an  analysis  of  our  audited  financial  results  for  the  year  ended 
November 30, 2016 compared to the year ended November 30, 2015.  

The  following  information  should  be  read  in  conjunction  with  our  November  30, 2016  audited  consolidated 
financial  statements  and  related  notes  which  were  prepared  in  accordance  with  United  States  generally  accepted 
accounting principles (“U.S. GAAP”). A summary of the U.S. GAAP accounting policies are outlined in note 2 of 
the  audited  consolidated  financial  statements.  All  amounts  are  in  United  States  dollars  unless  otherwise  stated. 
References to “Canadian dollars” and “C$” and “CDN$” are to the currency of Canada, references to “U.S. dollars”, 
“$”  or  “US$”  are  to  the  currency  of  the  United  States  and  references  to  “Colombian  pesos”  or  “COP”  are  to  the 
currency of the Republic of Colombia. 

Erin  Workman,  P.Geo.,  an  employee  and  the  Director,  Technical  Services,  is  a  Qualified  Person  under  National 
Instrument  43-101  -  Standards  of  Disclosure  for  Mineral  Projects  (“NI  43-101”),  and  has  approved  the  scientific 
and technical information in this MD&A.  

Trilogy’s shares are listed on the Toronto Stock Exchange (“TSX”) and the NYSE-MKT under the symbol “TMQ”. 
Additional  information  related  to  Trilogy,  including  our  annual  report  on  Form  10-K,  is  available  on  SEDAR  at 
www.sedar.com and on EDGAR at www.sec.gov. 

Description of business 

We are a base metals exploration company focused on exploring and developing our mineral holdings in the Ambler 
mining  district  located  in  Alaska,  U.S.A.  We  conduct  our  operations  through  a  wholly-owned  subsidiary, 
NovaCopper US Inc. which is doing business as Trilogy Metals US (“NovaCopper US”). Our Upper Kobuk Mineral 
Projects,  (“UKMP”  or  “UKMP  Projects”),  consist  of:  i)  the  100%  owned  Ambler  lands  which  host  the  Arctic 
copper-zinc-lead-gold-silver  Project;  and  ii)  the  Bornite  lands  being  explored  under  a  collaborative  long-term 
agreement  with  NANA  Regional  Corporation,  Inc.  (“NANA”),  a  regional  Alaska  Native  Corporation,  which  host 
the Bornite carbonate-hosted copper Project.  

Property review 

Our principal assets, the UKMP Projects, are located in the Ambler mining district in Northwest Alaska. Our UKMP 
Projects comprise approximately 352,943 acres (142,831 hectares) consisting of the Ambler and Bornite lands.   

Arctic Project 

The  Ambler  lands,  which  host  a  number  of  deposits,  including  the  high-grade  copper-zinc-lead-gold-silver  Arctic 
Project, and other mineralized targets within a 100 kilometer long volcanogenic massive sulfide (“VMS”) belt, are 
owned  by  NovaCopper  US.  The  Ambler  lands  are  located  in  Northwestern  Alaska  and  consist  of  112,058  acres 
(45,348 hectares)  of  Federal  patented  mining  claims  and  State  of  Alaska  mining  claims,  within  which  VMS 
mineralization has been found.  

We have recorded the Ambler lands as a mineral property with acquisition costs capitalized and exploration costs 
expensed  in  accordance  with  our  accounting  policies.  As  a  result  of  the  spin-out  of  Trilogy  from  NovaGold 
Resources  Inc.  (“NovaGold”)  in  2012,  the  consolidated  financial  statements  have  been  presented  under  the 

69 

 
 
 
 
 
 
 
 
 
 
 
continuity  of  interest  basis  of  accounting  whereby  the  amounts  are  based  on  the  amounts  originally  recorded  by 
NovaGold as if we had held the property from inception.  

Bornite Project 

On  October 19,  2011,  NovaCopper  US  and  NANA  signed  a  collaborative  agreement  to  explore  and  develop  the 
Ambler  mining  district.  Under  the  Exploration  Agreement  and  Option  to  Lease  (the  “NANA  Agreement”),  we 
acquired the exclusive right to explore the Bornite property and lands deeded to NANA through the Alaska Native 
Claims Settlement Act (“ANCSA”), located adjacent to the Arctic Project, and the non-exclusive right to access and 
entry onto NANA’s lands. The agreement establishes a framework for any future development of either the Bornite 
Project or the Arctic Project. Both projects are included as part of a larger area of interest set forth in the NANA 
Agreement.  The  agreement  with  NANA  created  a  total  land  package  incorporating  our  Ambler  lands  with  the 
adjacent Bornite and ANCSA lands with a total area of approximately 352,900 acres (142,831 hectares). 

As consideration, $4.0 million was paid to NANA upon signing the NANA agreement and we gave NANA the right 
to  appoint  a  member  to  Trilogy’s  board  of  directors  before  April  2017.  NANA  has  not  exercised  their  right  to 
appoint a board member at this time. Upon the decision to proceed with development of a mine within the area of 
interest,  NANA  maintains  the  right  to  purchase  an  ownership  interest  in  the  mine  equal  to  between  16%-25%  or 
retain a 15% net proceeds royalty which is payable after we have recovered certain historical costs, including capital 
and cost of capital. Should NANA elect to purchase an ownership interest in the mine, consideration will be payable 
based on the elected percentage purchased and all the costs incurred on the properties less $40.0 million, not to be 
less than zero. The parties would form a joint venture and be responsible for all future costs incurred in connection 
with the mine, including capital costs of the mine, based on each party’s pro-rata share.  

NANA  would also be granted a net smelter return royalty between 1% and 2.5% upon the execution of a  mining 
lease  or  a  surface  use  agreement,  the  amount  of  which  is  determined  by  the  particular  area  of  land  from  which 
production originates. 

We have accounted for the Bornite property as a mineral property with acquisition costs capitalized and exploration 
costs expensed in accordance with our accounting policies. 

Titiribi Project 

On June 19, 2015, Trilogy completed an arrangement to acquire Sunward Resources Ltd. (“Sunward”). As a result, 
Trilogy, through wholly-owned subsidiaries, Sunward Investments Ltd. (“Sunward Investments”), owned 100% of 
the Titiribi gold-copper exploration project located approximately 70 kilometers southwest of the city of Medellin, 
in  Antioquia  Department,  Colombia.  The  Titiribi  project’s  principal  mining  title  is  concession  5085,  which  was 
created  by  the  consolidation  of  five  concessions  and  four  exploration  licenses.  This  concession,  comprising  of  an 
area of 3,919 hectares, was registered with the National Mining Registry on April 18, 2013 and expires in 2043. 

Following the announcement of the sale of Sunward Investments (see “Corporate developments – Sale of Sunward 
Investments Ltd.”), and its ownership of the Titiribi project, we have accounted for it as a discontinued operation. 
The financial results have been adjusted retrospectively for the treatment as a discontinued operation.  

Corporate developments 

Name Change 

In  September  2016,  we  changed  our  name  to  Trilogy  Metals  Inc.  to  better  reflect  our  Company’s  naturally 
diversified resource base. The UKMP is located in the Ambler mining district in Northwest Alaska; a region known 
to  host  deposits  rich  in  copper,  zinc,  lead,  gold  and  silver.  The  Company  controls  the  mineral  rights  to 
approximately 353,000 acres of land containing two known  mineral belts, the  Ambler Schist Belt and the Bornite 
Carbonate  Sequence.  The  Ambler  Schist  Belt  hosts  VMS  type  mineralization  occurring  as  a  series  of  high-grade 
polymetallic copper-lead-zinc-gold-silver deposits along the entire 100 kilometer (70  mile) long belt. The Bornite 
Carbonate  Sequence  hosts  several  copper  replacement  targets  around  the  Aurora  and  Pardner  Hill  prospects,  in 
addition  to  an  established  resource  identified  at  Bornite.  Mineralization  at  Bornite  is  open  to  further  exploration. 
Upon  opening  of  the  markets  on  September  8,  2016,  our  shares  began  trading  on  the  TSX  and  the  NYSE-MKT 
under the symbol “TMQ”. Shareholders approved the name change to Trilogy at our annual and special meeting of 
shareholders held on May 18, 2016.  

70 

 
 
 
 
 
 
 
  
 
 
Sale of Sunward Investments  

On  September  1,  2016,  Trilogy  completed  the  sale  of  all  of  the  issued  and  outstanding  shares  of  Sunward 
Investments  to  Brazil  Resources  Inc.  (“BRI”)  for  consideration  of  5,000,000  common  shares  of  BRI,  of  which 
2,500,000 common shares are subject to a six month holding period, and 1,000,000 BRI warrants, with each warrant 
exercisable into one common share of BRI for a period of two years from the completion date at an exercise price of 
CDN$3.50.  The  total  consideration  was  valued  at  approximately  $8.1  million.  Sunward  Investments,  through  a 
subsidiary, owns 100% of the Titiribi gold-copper exploration project. On December 7, 2016 BRI changed its name 
to GoldMining Inc.   

The Company reclassified the operations of Sunward Investments as a discontinued operation, retrospectively, and 
recognized a gain on the sale of $4.4 million in the fourth quarter of 2016. 

Long-term incentives 

During the year ended November 30, 2016, the Board of Directors approved the granting of 1,785,000 stock options 
to employees, consultants and directors with various vesting terms over two years and 600,000 restricted share units 
(“RSUs”) to officers vesting equally in thirds on the grant date, the first anniversary of the grant date, and the second 
anniversary of the grant date.  

Project activities 

In  the  spring  of  2016  we  announced  the  release  of  an  updated  resource  estimate  and  National  Instrument  43-101 
Technical  Report  on  the  Bornite  Project.  The  update  incorporated  a  new  3D  lithology,  alteration  and  structural 
model  for  the  Bornite  deposit,  as  well  as  results  from  previously  un-sampled  or  partially  sampled  historical 
Kennecott  drill  core.  A  positive  update  with  contained  copper  in  Indicated  Resources  increasing  from  334  to 913 
million  pounds  constituting  a  173%  increase  in  contained  metal.  Total  contained  copper  in  Inferred  Resources 
decreased from 5.7 to 5.5 billion pounds (1.8Blbs in-pit and 3.7Blbs below-pit) which constitutes a 4% decrease in 
contained  metal  due  principally  to  moving  in-pit  Inferred  Resources  to  the  Indicated  category.  We  continue  to 
evaluate  geological  and  hydrogeological  data  to  support  internal  desktop  evaluations  and  planning  of  future  field 
investigations at the Bornite project.  

In  fiscal  2016,  we  expended  $5.0  million  on  the  UKMP  Projects,  mainly  at  Arctic,  consisting  of  $1.3  million  in 
wages and benefits, $0.7  million in drilling, $0.7  million in engineering expenses, $1.3 million in project support 
expenses, $0.4  million in land  maintenance and permit expenses, and $0.3  million in environmental studies.  The 
Company  completed  another  successful  field  season  in  2016  advancing  the  Arctic  deposit  towards  pre-feasibility. 
We  accomplished  a  3,058  meter  drill  program  at  the  Arctic  Project,  significant  baseline  environmental  data 
collection, and furthered the engineering of the project. The summer field season was completed on time and 10% 
under budget, with a total spend of $5.0 million in 2016. The 2016 drill program was designed to collect data for 
geotechnical,  hydrological,  waste  rock  characterization  and  metallurgical  studies  as  well  as  further  resource 
definition.  

Three drill holes representing 822 meters drilled were designed to collect geotechnical and hydrological data within 
the proposed Arctic open-pit. Data collected from the geotechnical/hydrological drill program was used to update a 
3D  structure  model,  rock  mass  model,  and  hydrogeology  model  and  these  results  have  been  integrated  into  a 
combined  geotechnical  model  that  will  be  used  for  characterization  of  geotechnical  domains  and  slope  stability 
evaluation in a future pre-feasibility study. 

Four  drill  holes  representing  1,030  meters  drilled  were  designed  to  collect  metallurgical  samples,  specifically 
targeting  material  within  the  initial  production  years  of  the  Arctic  open-pit.  A  metallurgical  test  work  program  is 
currently underway and expected to be complete in Q1-2017. 

Six drill holes representing 1,206 meters drilled were designed to evaluate vertical and lateral continuity of the high 
grade polymetallic copper, gold, silver, lead, and zinc mineralization, and support upgrading of Inferred resources to 
Measured and Indicated resource classification  within the area of the proposed Arctic open-pit. We are pleased to 
announce  that  all  six  infill  holes  encountered  mineralized  intervals  consistent  with  previous  drilling  conducted 
within the resource area on the property. Data collected from the drill program was used to update the 3D geology 
model. The updated geology domains and drill data will be incorporated into an updated resource estimate that will 
support a future pre-feasibility study.  

71 

 
 
 
 
 
 
 
 
 
 
 
 
Substantial  field  work  was  also  completed  to  support  the  continuation  of  baseline  environmental  data  collection. 
During the course of the field season, data collection was completed to support an aquatic survey, an avian and large 
mammal  habitat  survey,  an  archaeological  survey  and  expansion  of  the  wetlands  delineation  and  surface  quality 
work.  An aquatics  survey of  rivers and creeks over the UKMP included identification  of  fish  species present and 
tissues metals testing. An avian survey over the UKMP was conducted in May to identify bird nest locations, with a 
follow-up  survey  in  July  to  measure  fledging  success.  A  habitat  survey  was  completed  in  conjunction  with  the 
wetlands survey and will be used to inform future biological surveys. Approximately 2,400 acres were surveyed for 
archaeological  resources  in  or  around  the  potential  Arctic  open-pit  and  facilities  locations.  Approximately  2,900 
acres of wetlands were delineated using techniques approved by the Army Corps of Engineers. On-going baseline 
environmental  data  collection  included  maintenance  of  three  hydrologic  gauging  stations  and  one  meteorological 
station. Surface water quality samples were taken from sixteen surface water locations and analyzed for a full suite 
of parameters including total and dissolved metals. 

We  continue  to  advance  the  acid-base-accounting  static  and  kinetic  test  work  at  Arctic.  Continuous  down-hole 
samples were collected from this year’s drill program to support static testing coverage over the Arctic deposit. On-
site barrel sampling was successfully completed in the spring and fall of 2016 to support the kinetics program, and 
in  August  we  achieved  the  40-week  milestone  for  the  parallel  laboratory  humidity  cells;  maintenance  and 
monitoring of all kinetic tests will continue into 2017. 

The LiDAR survey that was incomplete last year due to weather conditions was also completed during the summer. 
Final deliverables were received this fall has have already proven helpful in supporting on-going engineering design 
and geological modeling. 

We continued our efforts on supporting the Alaska Industrial Development Export Authority ("AIDEA”) throughout 
2016 towards drafting an Environmental Impact Statement (“EIS”) as prescribed under the National Environmental 
Policy Act process to permit the Ambler Mining District Industrial Access Project (“AMDIAP”). The AMDIAP is 
anticipated to provide surface access to the  Ambler  mining district and our UKMP Projects – Arctic and Bornite.  
The project design is modeled on AIDEA’s successful DeLong Mountain Transportation System (“DMTS”), which 
includes an industrial access road from the Red Dog Mine to the DMTS port. AIDEA worked with private industry 
to develop the DMTS industrial access road, and the costs of road construction were paid back through tolls on road 
use.  AMDIAP,  once  complete,  will  provide  access  to  the  Ambler  Mining  District  through  Gates  of  the  Arctic 
National Preserve. This access is guaranteed in the Alaska National Interest Lands Conservation Act (“ANILCA”). 

On  October  21,  2015,  Alaska’s  Governor  authorized  AIDEA  to  begin  the  EIS  process  and  shortly  thereafter,  the 
Consolidated SF299 ANILCA applications were submitted by AIDEA to the relevant federal agencies, including the 
National  Park  Service  (“NPS”),  the  U.S.  Army  Corp  of  Engineers  (“USACE”),  Bureau  of  Land  Management 
(“BLM”), U.S. Coast Guard (“USCG”), and the U.S. Federal Highway Administration (“FHWA”).  NPS, USACE, 
BLM, and FHWA have accepted the application to move forward and have determined that BLM will be the lead 
federal agency for the EIS, along with NPS taking the lead on the Environmental and Economic Analysis (“EEA”) 
per ANILCA Section 201.4(d).  A project kickoff meeting with State of Alaska and Federal agencies was held in 
early  December  2016  to  discuss  next  steps  which  include  the  scope  of  work  for  the  third  party  EIS  contractor, 
anticipated  timing  of  BLM  issuance  of  the  Notice  of  Intent  between  March  2017  and  May  2017,  and  NPS  and 
FHWA working on the EEA.  More information on the AMDIAP and the ANILCA permitting process is available 
on AIDEA’s website at www.ambleraccess.org, which website is not incorporated by reference. 

Outlook  

In  2017,  we  will  continue  to  advance  the  development  of  our  UKMP  Projects.    We  are  currently  working  on 
incorporating new surface mapping, a LiDAR survey, and drill hole information into an updated 3D geology model 
for  the  Arctic  deposit.  The  new  3D  geology  model  will  update  structural,  lithology,  mineralization  and  alteration 
domains  into  an  integrated  geology  model  that  can  support  pre-feasibility  level  resource  evaluations  and  mine 
planning. In the first quarter of 2017, we expect to complete a resource model update for the Arctic project that will 
include new assays collected  from 2015 and 2016 drill core, specific gravity determinations collected  from  waste 
and mineralized material, and ABA static analyses collected from the hanging wall of the Arctic deposit – these data 
will support upgrading of Inferred resources to Measured and Indicated resource classification as well as future pre-
feasibility  level  mine  planning  and  open-pit  design.  During  summer  2016,  five  drill  holes  were  completed  at  the 
Arctic  project  to  support  a  pre-feasibility  level  metallurgical  test  program.  We  retained  ALS  Metallurgy  of 
Kamloops,  British  Columbia  to  complete  the  test  work.  The  study  will  include  confirmation  of  the  metallurgical 
response  of  a  Master  Composite  of  approximately  400  kilograms,  assessment  of  the  variance  in  metallurgical 

72 

 
 
 
 
 
 
 
 
responses across the deposit, and completion of copper-lead separation testing – work is on-going and expected to 
continue  into  the  second  quarter  of  2017.  We  continue  to  advance  our  understanding  of  ABA/ML  waste 
characterization  at  the  Arctic  project,  in  support  of  this  task  we  plan  to  continue  monthly  sampling  of  laboratory 
Humidity Cell Tests through the end of 2017. 

During summer 2013, two drill holes were completed in the open-pittable Ruby Creek zone of the Bornite deposit; 
the core was logged as per Company standard logging procedures, sampled and shipped to the Fairbanks warehouse 
where  samples  remained  in  cold  storage  pending  processing.    In  September  2016,  we  retained  SGS  Minerals 
Services of Burnaby, British  Columbia to perform a  mineralogical and  metallurgical test program  for the retained 
samples of the open pit zone of the Bornite deposit. The study will include mineralogical characterization through 
quantitative  analysis  (QEMSCAN)  and  optimization  of  the  metallurgical  parameters  to  best  recover  the  base  and 
precious  metal  values  in  the  mineralized  material  –  work  is  on-going  and  expected  to  continue  into  the  second 
quarter  of  2017.  In  November  2016,  we  retained  SRK  Consulting  of  Vancouver,  British  Columbia  to  review 
hydrogeological  conditions  at  the  Bornite  property,  update  the  hydrogeological  conceptual  model  and  provide 
recommendations for future data collection – work is on-going and expected to continue into the second quarter of 
2017.  

In  the  first  half  of  2017,  we  expect  to  complete  a  number  of  stand-alone  and  district  trade-off  studies  that  will 
include updated information on the Arctic and Bornite projects. These trade-off studies will guide planning of future 
site investigations to support pre-feasibility. 

We  continue  to  work  with  NANA  on  workforce  development  within  NANA’s  region.    Through  the  Oversight 
Committee and the Workforce Development sub-committee, NANA and the Company jointly work on programs to 
facilitate  local  hiring  of  NANA  shareholders.    The  Company  has  contributed  a  total  of  $140,000  to a  scholarship 
fund  which  grants awards to  NANA  shareholders  for either (i) the recipient’s student expenses directly related  to 
education,  i.e.,  academic  education  at  an  accredited  institution;  or  (ii)  the  recipient’s  student  expenses  directly 
related to vocational or technical schooling or training at a recognized institution intended to qualify the recipient for 
enhanced  employment  opportunities.    The  Workforce  Development  sub-committee  which  consists  of  equal 
representation  from  NANA  and  the  Company  will  review  all  applications  for  2017  and  will  select  recipients  for 
grant  awards.    We  are  committed  to  training  and  hiring  locally.    We  have  been  very  successful  in  hiring  NANA 
shareholders at the UKMP Projects, achieving over 50% local hire each  year over the past 5  years.  In 2016, our 
field season employees consisted of 55% NANA shareholders and in 2017, we are committed to the continuation of 
hiring locally at the project. 

We  are  also  working  closely  with  AIDEA  to  amend  the  Memorandum  of  Understanding  (“MOU”)  ,  originally 
signed in 2013, as the industrial road route has been selected and permitting documents have been submitted to the 
relevant US federal agencies.  We will work with AIDEA, as the proponent for the AMDIAP, to have a direct input 
into the permitting process for the road and have the ability to attend  meetings  with the BLM, as the lead federal 
agency for the EIS process. 

73 

 
 
 
 
 
 
 
Summary of results  

Selected expenses 

General and administrative 
Mineral properties expense  
Professional fees 
Salaries 
Salaries – stock-based compensation 
Loss from continued operations for the year 
(Income)/loss from discontinued operations for the 

year 

Loss and comprehensive loss for the year 
Basic and diluted loss per common share 

Year ended 
November 30, 
2016 
$ 
1,337 
5,037 
442 
1,003 
615 
8,712 
(3,850) 

in thousands of dollars, 
except for per share amounts 
Year ended 
November 30, 
2014 
$ 
1,484 
2,512 
952 
3,012 
887 
9,648 
- 

Year ended 
November 30, 
2015 
$ 
1,346 
4,167 
1,346 
1,085 
831 
9,134 
398 

4,862 
$0.05 

9,532 
$0.12 

9,648 
$0.17 

For the year ended November 30, 2016, we reported a net loss of $4.9 million (or $0.05 basic and diluted loss per 
common  share)  compared  to  a  net  loss  for  the  corresponding  period  in  2015  of  $9.5  million  (or  $0.12  basic  and 
diluted loss per common share) and a net loss of $9.6 million for the corresponding period in 2014 (or $0.17 basic 
and  diluted  loss  per  common  share).  This  variance  was  primarily  due  to  a  one-time  gain  on  the  sale  of  Sunward 
Investments.  Additionally, there were decreases in annual professional fees and stock-based compensation expense 
offset against an increase in mineral properties expenses in 2016.  

The significant variance in 2016 relates to the gain recognized on the sale of Sunward Investments and the Titiribi 
Project  of  $4.4  million,  pre-tax.  This  was  a  one-time  event  for  which  there  is  no  comparable  gain  in  prior  years. 
Additionally,  as  a  result  of  the  sale,  the  operations  of  Sunward  Investments  were  reclassified  as  a  discontinued 
operation, retrospectively. Expenses of $0.6 million for the year ended November 30, 2016 and $0.4 million for the 
year  ended  November  30,  2015  related  to  the  Sunward  Investments  operations  were  reclassified  to  discontinued 
operations.  As  Sunward  was  purchased  by  the  Company  in  June  2015,  there  are  no  amounts  prior  to  June  2015 
included in the consolidated results. In addition to the gain recognized on the sale, we also realized $0.1 million in 
gains on the sale of investments received as consideration for the year ended November 30, 2016.  

Professional fees for the year ended November 30, 2016 were $0.4 million, a reduction of $0.9 million from the $1.3 
million incurred for the year ended November 30, 2015, and a reduction from the $1.0 million incurred for the year 
ended November 30, 2014. Expenses in 2016 were down significantly due to less corporate transaction activity as 
well as $0.2 million in costs related to the sale of Sunward recorded in discontinued operations. In 2015, expenses 
were  incurred  for  legal  and  technical  due  diligence  and  regulatory  approvals  associated  with  the  acquisition  of 
Sunward and, in 2014, legal costs associated with private placement financing were incurred for which there is no 
comparable amount in the current year. 

The variance in the mineral properties expense was primarily due to the differing magnitude of the field programs at 
our UKMP Project in 2016, 2015 and 2014. In 2016, we completed a similar-sized drill program consisting of 3,058 
meters  at  the  Arctic  Project,  however,  we  significantly  increased  the  environmental  baseline  data  collection  and 
engineering site investigations compared to the 2015 program. In 2015, we completed fourteen diamond drill holes 
amounting  to  3,056  meters  at  the  Arctic  Project,  as  well  as  engineering  and  environmental  site  investigations.  In 
2014, we completed a re-sampling and re-assaying program of approximately 13,000 meters of historical drill core 
from  Bornite.  Mineral  property  expenses  consist  of  direct  drilling,  personnel,  community,  resource  reporting  and 
other  exploration  expenses,  as  well  as  indirect  project  support  expenses  such  as  fixed  wing  charters,  helicopter 
support, fuel, and other camp operation costs.  

The other reduction in expenses is from a charge of $0.6 million in stock-based compensation in 2016 compared to 
$0.8 million in 2015, and $0.9 million in 2014. The expense recognized for the current year includes $0.4 million in 
expense relating to stock options and $0.3 million in expense relating to RSUs and deferred share units (“DSUs”).  
The 2015 expense included $0.7 million in expense relating to stock options and $0.1 million in expense relating to 
DSUs  issued  to  non-executive  directors  in  lieu  of  cash  remuneration.  The  expense  recognized  for  2014  included 
$0.5 million in expense relating to stock options and $0.4 million in expense relating to previously granted RSUs 
and DSUs.  

74 

 
 
 
 
 
 
 
Other important variances for the year ended November 30, 2016 compared to the same period in 2015 and 2014 are 
as follows: (a) $1.3 million in general and administrative expenses in 2016 and 2015 compared to $1.5 million in  
due to cost reduction efforts as well as a favorable foreign exchange movement; and (b) $1.0 million in salaries in 
2016  compared  to  $1.1  million  in  2015  and  $3.0  million  in  2014  primarily  related  to  cost  reduction  initiatives 
implemented in the third quarter of 2014 that reduced the number of employees in the corporate office. The salaries 
in 2014 also included a one-time severance cost of $1.3 million paid to former employees offset by a recovery of 
$0.3 million due to a reversal of accrued bonuses from 2013 to employees no longer eligible to receive payment.  

The comparable basic and diluted loss per common share for 2016 is lower than 2015 and 2014 due to the gain on 
the sale of Sunward Investments. The 2015 basic and diluted loss per common share is lower than 2014 mainly as a 
result of the additional shares issued during 2015 as a result of the Sunward acquisition completed in June 2015 as 
well as a lower loss figure.  

Fourth quarter results 

During the fourth quarter of 2016, we earned income of $2.0 million compared to a net loss of $2.1 million for the 
comparable  period  in  2015.  The  earnings  in  the  fourth  quarter  of  2016  were  due  to  the  gain  on  sale  of  Sunward 
Investments of $4.4 million offsetting net expenses of $2.4 million. We incurred $1.4 million of  mineral property 
expenses in the fourth quarter of 2016 compared to $0.8 million in the fourth quarter of 2015 for fairly comparable 
expenses including assaying costs from the summer drill program and engineering costs for the Arctic deposit. We 
recognized $0.2 million in foreign exchange losses in the fourth quarter of 2016 mainly due to the movement of the 
Canadian dollar as a result of holding the investments in BRI. As we acquired the investments in the fourth quarter 
of 2016, there is no comparable amount in 2015.  

Selected financial data 

Annual information  

The following annual information is prepared in accordance with U.S. GAAP. 

Interest income 
Expenses  
(Income)/Loss from discontinued operations for the 

year 

Loss and comprehensive loss for the year 
Total assets 
Total liabilities 

Year ended 
November 30, 
2016 
$ 
61 
8,918 
(3,850) 

Year ended 
November 30, 
2015 
$ 
24 
9,158 
398 

in thousands of dollars 
Year ended 
November 30, 
2014 
$ 
2 
9,650 
- 

4,862 
46,747 
593 

9,532 
51,181 
751 

9,648 
36,826 
979 

Quarterly information 

Interest and other income  
Mineral property expenses 
Income (loss) from 

discontinued operations for 
the period 

Earnings (loss) for the period 
Earnings (loss) per common 
share – basic and diluted 

Q4 2016 
11/30/16 
$ 
10 
1,430 
4,561 

Q3 2016 
08/31/16 
$ 
15 
2,617 
(352) 

Q2 2016 
05/31/16 
$ 
18 
458 
(187) 

Q1 2016 
02/28/16 
$ 
18 
532 
(172) 

Q4 2015 
11/30/15 
$ 
12 
779 
(200) 

Q3 2015 
08/31/15 
$ 
8 
2,771 
(198) 

in thousands of dollars, 
except per share amounts 
Q1 2015 
02/28/15 
$ 
- 
327 
- 

Q2 2015 
05/31/15 
$ 
4 
291 
- 

2,025 
0.02 

(3,544) 
(0.03) 

(1,648) 
(0.02) 

(1,695) 
($0.02) 

(2,090) 
(0.02) 

(4,162) 
(0.04) 

(1,750) 
(0.03) 

(1,530) 
(0.03) 

Factors that can cause fluctuations in our quarterly results include the length of the exploration field season at the 
properties,  the  type  of  program  conducted,  stock  option  vesting,  and  issuance  of  shares.  Other  factors  that  have 

75 

 
 
 
 
 
 
 
 
 
 
 
 
caused  fluctuations  in  the  quarterly  results  that  would  not  be  expected  to  re-occur  include  the  acquisition  and 
disposition of Sunward and financing activities.  

Our  loss  for  the  first  quarter  ended  February  28,  2015  was  significantly  reduced  in  comparison  to  previous  first 
quarter periods due to the Company’s cost cutting efforts to reduce professional fees, salaries and mineral property 
expenses.  During  the  first  quarter  of  2015,  we  incurred  mineral  property  expense  of  $0.3  million  mainly  on 
community support and project staff salaries as our field season this year did not commence until early in the third 
quarter. During the second quarter of 2015, we incurred $0.3 million in mineral property expenses, the same level of 
activities as the first quarter of 2015. We also incurred $0.7 million in professional fees during the second quarter of 
2015  mainly  due  to  the  acquisition  of  Sunward.  During  the  third  quarter  of  2015,  we  incurred  mineral  property 
expenses  of  $2.8  million  as  we  completed  our  drilling  program.  We  also  incurred  $0.2  million  of  discontinued 
operation  costs  operating  Sunward.  As  a  result,  our  loss  for  the  third  quarter  ended  August  31,  2015  is  higher 
compared  to  previous  quarter  losses.  Our  net  loss  for  the  fourth  quarter  of  2015  of  $2.1  million  consists  of  $0.8 
million in mineral property expenses incurred for assay costs and engineering studies conducted in the fall as well as 
$0.2 million in discontinued operation costs from Sunward.  

Our  loss  for  the  first  quarter  ended  February  28,  2016  is  slightly  increased  compared  to  the  first  quarter  ended 
February 28, 2015 due to increased mineral property expenses relating to engineering studies completed in advance 
of  the  2016  field  program,  as  well  as  costs  related  to  operating  Sunward.  During  the  second  quarter  of  2016,  we 
incurred $0.5 million in  mineral property expenses due to field season starting up in the last  month of the second 
quarter  and  $0.2  million  in  discontinued  operations  relating  to  Sunward.  During  the  third  quarter  of  2016,  we 
incurred mineral property expenses of $2.6 million as we completed our drilling program. As a result, our loss for 
the third quarter ended August 31, 2016 is higher compared to previous third quarter losses. We recognized earnings 
for the fourth quarter of 2016 of $2.0 million due to the gain on the sale of Sunward. Adjusted for the discontinued 
operations, the fourth quarter periods are comparable.  

Liquidity and capital resources  

At November 30, 2016, we had $7.3 million in cash and cash equivalents. We expended $8.9 million on operating 
activities during the 2016 fiscal year compared with $8.4 million for operating activities for the same period in 2015, 
and expenditures of $8.6 million for operating activities for the same period in 2014. A majority of cash spent on 
operating  activities  during  all  periods  was  expended  on  mineral  property  expenses,  professional  fees,  salaries  and 
general and administrative expenses. The increase in cash spent in the year ended November 30, 2016 is mainly due 
to increased mineral property expenses of $0.9 million, increased discontinued operations expense of $0.2 million 
expended  on  Sunward  offset  by  decreased  professional  fees  of  $0.9  million.    As  at  November  30,  2016,  the 
Company continues to manage its cash expenditures and management believes that the working capital available is 
sufficient  to  meet  its  operational  requirements  for  the  next  year.  Future  financings  are  anticipated  through  equity 
financing, debt financing, the sale of investments, convertible debt, or other means. 

During  the  year  ended  November  30,  2014,  we  raised  $7.2  million  in  proceeds  from  the  completion  of  a  private 
placement in July 2014. There was no comparable amount from financing activities in 2015 or 2016. 

During the year ended November 30, 2016, we raised $0.2 million in sales from investments acquired through the 
sale of Sunward Investments. During the year ended November 30, 2015, we generated $19.4 million from investing 
activities through the acquisition of Sunward. There was no comparable amount from investing activities in 2014. In 
2014 and 2015, to conserve cash, our expenditures were minimal and limited to replacements that were absolutely 
necessary. In 2016, we spent $0.1 million purchasing vehicles and equipment to replace older vehicles. 

Contractual obligations 

Contractual obligated undiscounted cash flow requirements as at November 30, 2016 are as follows. 

Accounts payable and accrued liabilities 
Office lease 
Total 

Total 
$ 
593 
75 
668 

< 1 Year 
$ 
593 
75 
668 

1–3 Years 
$ 
- 
- 
- 

in thousands of dollars, 
unless otherwise specified 
> 5 Years 
$ 
- 
- 
- 

3–5 Years 
$ 
- 
- 
- 

76 

 
 
 
 
 
 
 
 
 
 
 
On  January  25,  2013,  the  Company  entered  into  a  commitment  to  lease  office  space  effective  May  1,  2013  for  a 
period of four years with a remaining total commitment at November 30, 2016 of $0.08 million. 

Off-balance sheet arrangements 

We have no material off-balance sheet arrangements. The Company has lease commitments for office spaces with a 
remaining total commitment of $0.08 million. 

Outstanding share data 

At  February  2,  2017,  we  had  105,501,761  common  shares  issued  and  outstanding.  At  February  2,  2017,  we  had 
outstanding  6,521,740  warrants  with  an  exercise  price  of  $1.60  each,  7,562,765  stock  options  with  a  weighted-
average  exercise  price  of  $0.53,  958,648  DSUs,  600,002  RSUs,  66,664  NovaGold  Arrangement  Options  with  a 
weighted-average exercise price of $3.91, and 20,685 NovaGold DSUs  for  which the  holder is entitled to receive 
one common share for every six NovaGold shares received. For additional information on NovaGold Arrangement 
Options  and  NovaGold  DSUs,  please  refer  to  note  8  in  our  November  30,  2016  audited  consolidated  financial 
statements.  Upon  exercising  all  of  forgoing  convertible  securities,  the  Company  would  be  required  to  issue  an 
aggregate of 15,713,266 common shares. 

Financial instruments 

Our  financial  instruments  consist  of  cash  and  cash  equivalents,  accounts  receivable,  deposits,  investments,  and 
accounts  payable  and  accrued  liabilities.  The  fair  value  of  the  financial  instruments  approximates  their  carrying 
value due to the short-term nature of their maturity. Our financial instruments initially measured at fair value and 
then held at amortized cost include cash and cash equivalents, accounts receivable, deposits, and accounts payable 
and  accrued  liabilities.    Our  investments  are  held  for  trading  and  are  marked-to-market  at  each  period  end  with 
changes in fair value recorded to the statement of loss.  

(a)  Currency risk 

Currency risk is the risk of a fluctuation in financial asset and liability settlement amounts due to a change in foreign 
exchange rates. We operate in the United States, Canada, and previously operated in Colombia with some expenses 
incurred in Canadian dollars and Colombian pesos. Our exposure to currency risk at November 30, 2016 is limited 
to the Canadian dollar consisting of cash of CDN$451,000, accounts receivable of CDN$32,000, deposits amounts 
of CDN$146,000, investments of CDN$10,521,000 and accounts payable of CDN$528,000. Based on a 1% change 
in  the  US-Canadian  exchange  rate,  assuming  all  other  variables  remain  constant,  the  Company’s  net  loss  would 
change by approximately $79,000.  

(b)  Credit risk 

Credit risk is the risk of an unexpected loss  if a customer  or third party to a financial instrument  fails to  meet  its 
contractual  obligations.  The  Company  holds  cash  and  cash  equivalents  with  Canadian  Chartered  financial 
institutions. The Company’s accounts receivable consist of GST receivable from the Federal Government of Canada 
and  other  receivables  for  recoverable  expenses.  The  Company’s  exposure  to  credit  risk  is  equal  to  the  balance  of 
cash and cash equivalents and accounts receivable as recorded in the financial statements. 

(c)  Liquidity risk 

Liquidity risk is the risk that we will encounter difficulties raising funds to meet our financial obligations as they fall 
due.  The  Company  does  not  have  cash  inflows  from  operations;  therefore,  the  Company  manages  liquidity  risk 
through the management of our capital structure and financial leverage. Future financings may be obtained through 
debt  financing,  equity  financing,  sales  of  investments,  convertible  debt,  exercise  of  options,  or  other  means. 
Continued operations are dependent on our ability  to obtain additional  financing or to generate future cash flows. 
Our contractually obligated cash flow is disclosed under the section titled “Liquidity and capital resources.”   

(d)  Interest rate risk 

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of 
changes in market interest rates. The Company is exposed to interest rate risk with respect to interest earned on cash 

77 

 
 
 
 
   
 
 
 
 
 
 
 
 
and cash equivalents. Based on balances as at November 30, 2016, a 1% change in interest rates would result in a 
change in net loss of $0.1 million, assuming all other variables remain constant. 

As we are currently in the exploration phase none of our financial instruments are exposed to commodity price risk; 
however, our ability to obtain long-term financing and its economic viability could be affected by commodity price 
volatility.  

New accounting pronouncements 

Certain  recent  accounting  pronouncements  have  been  included  under  note  2  in  our  November  30, 2016  audited 
consolidated financial statements 

Critical accounting estimates 

The most critical accounting estimates upon which our financial status depends are those requiring estimates of the 
recoverability  of  our  capitalized  mineral  properties,  impairment  of  long-lived  assets,  accounting  for  business 
combinations, income taxes and valuation of stock-based compensation.  

Mineral properties and development costs 

All  direct  costs  related  to  the  acquisition  of  mineral  property  interests  are  capitalized.  The  acquisition  of  title  to 
mineral  properties  is  a  complicated  and  uncertain  process.  The  Company  has  taken  steps,  in  accordance  with 
industry  standards, to verify  the title to  mineral properties in  which  it has an interest.  Although the  Company  has 
made efforts to ensure that legal title to its mining assets is properly recorded, there can be no assurance that such 
title will be secured indefinitely. 

Impairment of long-lived assets 

Management assesses the possibility of impairment in the carrying value of its long-lived assets whenever events or 
circumstances  indicate  that  the  carrying  amounts  of  the  asset  or  asset  group  may  not  be  recoverable.  Significant 
judgments are made in assessing the possibility of impairment. Management considers several factors in considering 
if an indicator of impairment has occurred, including but not limited to, indications of value from external sources, 
significant  changes  in  the  legal,  business  or  regulatory  environment,  and  adverse  changes  in  the  use  of  physical 
condition of the asset. These factors are subjective and require consideration at each period end. If an indicator of 
impairment is determined to exist, management calculates the estimated undiscounted future net cash flows relating 
to the asset or asset group using estimated future prices, mineral resources, and operating, capital and reclamation 
costs. When the carrying value of an asset exceeds the related undiscounted cash flows, the asset is written down to 
its estimated fair value, which is usually determined using discounted future cash flows. Management’s estimates of 
mineral prices,  mineral resources, foreign exchange rates,  production levels and operating capital and reclamation 
costs are subject to risk and uncertainties that  may affect the determination of the recoverability of the long-lived 
asset.  

Income taxes 

We  must  make  estimates  and  judgments  in  determining  the  provision  for  income  tax  expense,  deferred  tax  assets 
and liabilities, and liabilities for unrecognized tax benefits including interest and penalties. We are subject to income 
tax  law  in  the  United  States,  Canada  and  previously  in  Colombia.  The  evaluation  of  tax  liabilities  involving 
uncertainties  in  the  application  of  complex  tax  regulation  is  based  on  factors  such  as  changes  in  facts  or 
circumstances, changes in tax law, new audit activity, and effectively settled issues. The evaluation of an uncertain 
tax position requires significant judgment, and a change in such recognition would result in an additional charge to 
the income tax expense and liability.  

Stock-based compensation 

Compensation expense for options granted to employees, directors and certain service providers is determined based 
on  estimated  fair  values  of  the  options  at  the  time  of  grant  using  the  Black-Scholes  option  pricing  model,  which 
takes  into  account,  as  of  the  grant  date,  the  fair  market  value  of  the  shares,  expected  volatility,  expected  life, 
expected forfeiture rate, expected dividend yield and the risk-free interest rate over the expected life of the option. 
The  use  of  the  Black-Scholes  option  pricing  model  requires  input  estimation  of  the  expected  life  of  the  option, 

78 

 
 
 
 
 
 
 
 
 
volatility,  and  forfeiture  rate  which  can  have  a  significant  impact  on  the  valuation  model,  and  resulting  expense 
recorded.  

Disclosure controls and procedures 

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed 
or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized and 
reported  within  the  time  periods  specified  in  those  rules,  including  providing  reasonable  assurance  that  material 
information  is  gathered  and  reported  to  senior  management,  including  the  Chief  Executive  Officer  (“CEO”)  and 
Chief  Financial  Officer  (“CFO”),  as  appropriate,  to  permit  timely  decisions  regarding  public  disclosure. 
Management,  including  the  CEO  and  CFO,  has  evaluated  the  effectiveness  of  the  design  and  operation  of  the 
Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and 15d-15(e) of the US Exchange Act 
and the rules of Canadian Securities Administration, as at November 30, 2016. Based on this evaluation, the CEO 
and CFO have concluded that the Company’s disclosure controls and procedures were effective.  

Internal control over financial reporting 

Management  is  responsible  for  establishing  and  maintaining  adequate  internal  control  over  financial  reporting  as 
defined in Rule 13a-15(f) and 15d-15(f) of the U.S. Exchange Act and National Instrument 52-109 Certification of 
Disclosure in Issuer’s Annual and Interim filings. Any system of internal control over financial reporting, no matter 
how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide 
only  reasonable  assurance  with  respect  to  financial  statement  preparation  and  presentation.  Management  has  used 
the  Committee  of  Sponsoring  Organizations  of  the  Treadway  Commission  in  Internal  Control  –  Integrated 
Framework (2013) to evaluate the effectiveness of the Company’s internal control over financial reporting. Based on 
this  assessment,  management  has  concluded  that  as  at  November 30, 2016,  the  Company’s  internal  control  over 
financial reporting was effective.  

Risk factors 

Trilogy and its future business, operations and financial condition are subject to various risks and uncertainties due 
to the nature of its business and the present stage of exploration of its mineral properties. Certain of these risks and 
uncertainties are under the heading “Risk Factors” under Trilogy’s Form 10-K dated February 2, 2017 available on 
SEDAR at www.sedar.com and EDGAR at www.sec.gov and on our website at www.trilogymetals.com.  

Additional information 

Additional information regarding the Company, including our annual report on Form 10-K, is available on SEDAR 
at www.sedar.com and EDGAR at www.sec.gov and on our website at www.trilogymetals.com.  

79 

 
 
 
 
 
 
 
 
 
 
Item 7A.  QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK 

Not applicable  

80 

 
 
Item 8.  FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA 

Supplementary Data 

For the required supplementary data, please see the section heading “Item 7. Management’s Discussion and Analysis 
of  Financial  Condition  and  Results  of  Operations  –  Summary  of  Quarterly  Results  and  Fourth  Quarter  Results” 
above.  

Trilogy Metals Inc. 
 (An Exploration-Stage Company) 

Consolidated Financial Statements 
November 30, 2016, 2015 and 2014 
 (expressed in US dollars) 

Management’s Report on Internal Control over Financial Reporting  

The  management  of  Trilogy  Metals  Inc.  is  responsible  for  establishing  and  maintaining  adequate  internal  control 
over financial reporting under Rule 13a-15(f) and 15d-15(f) of the U.S. Exchange Act. The Securities Exchange Act 
of 1934 defines this as a process designed by, or under the supervision of, the Company’s principal executive and 
principal financial officers and effected by the Company’s Board of Directors, management and other personnel, to 
provide  reasonable  assurance  regarding  the  reliability  of  financial  reporting  and  the  preparation  of  financial 
statements for external purposes in accordance with generally accepted accounting principles in the United States of 
America, and includes those policies and procedures that: 

• 

• 

• 

pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions 
and dispositions of the assets of the Company; 
provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial 
statements  in  accordance  with  generally  accepted  accounting  principles  in  the  United  States  of  America, 
and that receipts and expenditures of the Company are being made only in accordance with authorizations 
of management and directors of the Company; and 
provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or 
disposition  of  the  Company’s  assets  that  may  have  a  material  effect  on  the  consolidated  financial 
statements. 

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. 
Projections  of  any  evaluation  of  effectiveness  to  future  periods  are  subject  to  risk  that  controls  may  become 
inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may 
deteriorate. 

Management  assessed  the  effectiveness  of  the  Company’s  internal  control  over  financial  reporting  as  of 
November 30,  2016.  In  making  this  assessment,  the  Company’s  management  used  the  criteria  set  forth  by  the 
Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework 
(2013). 

Based  upon  our  assessment  and  those  criteria,  management  concluded  that  the  Company’s  internal  control  over 
financial reporting is effective as of November 30, 2016.  

/s/ Rick Van Nieuwenhuyse  

/s/ Elaine Sanders 

Rick Van Nieuwenhuyse     
President & Chief Executive Officer  

February 2, 2017 

Elaine Sanders 
Vice President & Chief Financial Officer 

81 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Report of Independent Registered Public Accounting Firm 

To the Shareholders of Trilogy Metals Inc. (formerly known as NovaCopper Inc.) 

the  accompanying  consolidated  balance  sheets  of  Trilogy  Metals 

We  have  audited 
Inc.  as  of  
November 30, 2016 and 2015 and the related consolidated statements of loss and comprehensive loss, changes in 
shareholders’  equity  and  cash  flows  for  each  of  the  years  in  the  three-year  period  ended  November  30,  2016. 
Management is responsible for these consolidated financial statements. Our responsibility is to express an opinion 
on these consolidated financial statements based on our audits. 

We  conducted  our  audits  in  accordance  with  the  standards  of  the  Public  Company  Accounting  Oversight  Board 
(United  States).  Those  standards  require  that  we  plan  and  perform  the  audit  to  obtain  reasonable  assurance  about 
whether  the  consolidated  financial  statements  are  free  of  material  misstatement.  Our  audits  of  the  consolidated 
financial  statements  included  examining,  on  a  test  basis,  evidence  supporting  the  amounts  and  disclosures  in  the 
consolidated  financial  statements,  assessing  the  accounting  principles  used  and  significant  estimates  made  by 
management,  and  evaluating  the  overall  consolidated  financial  statement  presentation.  We  were  not  engaged  to 
perform  an  audit  of  the  company’s  internal  control  over  financial  reporting.  Our  audits  included  consideration  of 
internal  control  over  financial  reporting  as  a  basis  for  designing  audit  procedures  that  are  appropriate  in  the 
circumstances,  but  not  for  the  purpose  of  expressing  an  opinion  on  the  effectiveness  of  the  company’s  internal 
control over financial reporting. Accordingly, we express no such opinion. Our audits also included performing such 
other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable 
basis for our opinions. 

In  our  opinion,  the  consolidated  financial  statements  referred  to  above  present  fairly,  in  all  material  respects,  the 
financial position of Trilogy Metals Inc. as of November 30, 2016 and 2015 and the results of its operations and its 
cash flows for each of the years in the three-year period ended November 30, 2016 in conformity with accounting 
principles generally accepted in the United States of America.  

signed “PricewaterhouseCoopers LLP” 

Chartered Professional Accountants 
Vancouver, British Columbia 
February 2, 2017 

82 

 
 
 
 
 
 
 
 
Trilogy Metals Inc. 
(An Exploration-Stage Company) 
Consolidated Balance Sheets 
As at November 30, 2016 and 2015 

Assets 
Current assets 
Cash and cash equivalents 
Accounts receivable 
Deposits and prepaid amounts 
Current investments (note 10) 
Current assets held for sale (note 3) 

Assets held for sale (note 3) 
Investments (note 10) 
Plant and equipment (note 5) 
Mineral properties and development costs (note 6) 

Liabilities 
Current liabilities 
Accounts payable and accrued liabilities (note 7) 
Current liabilities held for sale (note 3) 

Shareholders’ equity 
Share capital (note 8) – unlimited common shares authorized, no par value  
Issued -105,286,469 (2015 – 104,796,421) 
Warrants (note 8(e)) 
Contributed surplus  
Contributed surplus – options (note 8(a, b, c)) 
Contributed surplus – units (note 8(d)) 
Deficit accumulated during the exploration stage 

Commitments and contingencies (notes 6, 8, 12, 13) 
Subsequent events (note 13) 

November 30, 2016 
$ 

in thousands of US dollars 
November 30, 2015 
$ 

7,340 
47 
724 
7,538 
- 
15,649 

- 
297 
215 
30,586 
46,747 

593 
- 
593 

136,357 
2,163 
124 
18,134 
1,140 
(111,764) 
46,154 
46,747 

16,064 
39 
688 
- 
94 
16,885 

3,537 
- 
173 
30,586 
51,181 

712 
39 
751 

136,040 
2,163 
124 
17,841 
1,164 
(106,902) 
50,430 
51,181 

(See accompanying notes to the consolidated financial statements) 

/s/ Rick Van Nieuwenhuyse, Director 

/s/ Kalidas Madhavpeddi, Director 

Approved on behalf of the Board of Directors 

83 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Trilogy Metals Inc. 
(An Exploration-Stage Company) 
Consolidated Statements of Loss and Comprehensive Loss 
For the Years Ended November 30  

in thousands of US dollars, except share and per share amounts 

Expenses 

Amortization 
Foreign exchange loss  
General and administrative 
Investor relations 
Mineral properties expense (note 6(c)) 
Professional fees 
Salaries 
Salaries – stock-based compensation  
Total expenses 
Other items 
Unrealized gain on held for trading investments 
Gain on sale of investments 
Interest and other income 
Loss from continuing operations for the year 

Loss from discontinued operations  
Gain on sale of Sunward Investments Ltd. 
(Income)/loss from discontinued operations for the 

year (note 3) 

Loss and comprehensive loss for the year 

Basic and diluted loss from continuing operations per 

common share 

Basic (earnings)/loss from discontinued operations per 

common share 

Diluted (earnings)/loss from discontinued operations per 

common share 

Basic and diluted loss per common share  
Weighted average number of common shares 

outstanding  

2016 
$ 

79 
204 
1,337 
201 
5,037 
442 
1,003 
615 
8,918 

(88) 
(57) 
(61) 
8,712 

598 
(4,448) 
(3,850) 

4,862 

$0.08 

$(0.04) 

$(0.04) 

$0.05 

2015 
$ 

292 
 3 
1,346  
88 
4,167 
1,346 
1,085 
831 
9,158 

- 
- 
(24) 
9,134 

398 
- 
398 

9,532 

$0.11 

$0.01 

$0.01 

$0.12 

2014 
$ 

750 
2 
1,484 
51 
2,512 
952 
3,012 
887 
9,650 

- 
- 
(2) 
9,648 

- 
- 
- 

9,648 

$0.17 

- 

- 

$0.17 

105,103,952 

80,312,913 

56,268,326 

(See accompanying notes to the consolidated financial statements)

84 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Trilogy Metals Inc. 
(An Exploration-Stage Company) 
Consolidated Statements of Changes in Shareholders’ Equity 
For the Years Ended November 30  

Number of 
shares 
outstanding 
53,066,656 
46,929 
14,166 
6,521,740 
492,501 
154,373 
- 
- 
60,296,365 
43,116,312 
- 
7,499 
347,999 
795,368 
232,878 
- 
- 
104,796,421 
162,854 
108,399 
218,795 
- 
- 
105,286,469 

Share capital 
$ 
104,895 
631 
28 
5,068 
929 
282 
- 
- 
111,833 
22,851 
- 
7 
177 
819 
353 
- 
- 
136,040 
65 
34 
218 
- 
- 
136,357 

Warrants 
$ 
- 
- 
- 
2,163 
- 
- 
- 
- 
2,163 
- 
- 
- 
- 
- 
- 
- 
- 
2,163 
- 
- 
- 
- 
- 
2,163 

Contributed 
surplus 
$ 
152 
- 
(28) 
- 
- 
- 
- 
- 
124 
- 
- 
- 
- 
- 
- 
- 
- 
124 
- 
- 
- 
- 
- 
124 

Contributed 
surplus – 
options  
$ 
17,248 
(615) 
- 
- 
- 
- 
456 
- 
17,089 
108 
- 
(7) 
(35) 
- 
- 
686 
- 
17,841 
(65) 
- 
- 
358 
- 
18,134 

(See accompanying notes to the consolidated financial statements)

Balance – 2013  
Exercise of NovaGold Arrangement Options 
NovaGold Performance Share Units 
Private placement 
Restricted Share Units 
Deferred Share Units 
Stock-based compensation 
Loss for the year 
Balance – 2014 
Issuance pursuant to Sunward Arrangement 
Restricted Share Units to settle liability 
Exercise of options 
Exercise of Sunward Arrangement Options 
Restricted Share Units 
Deferred Share Units 
Stock-based compensation 
Loss for the year 
Balance – 2015 
Exercise of options 
Restricted Share Units 
Deferred Share Units 
Stock-based compensation 
Loss for the year 
Balance – 2016 

85 

in thousands of US dollars, except share amounts 
Total 
shareholders’ 
equity 
$ 
37,157 
16 
- 
7,231 
- 
204 
887 
(9,648) 
35,847 
22,959 
183 
- 
142 
- 
- 
831 
(9,532) 
50,430 
- 
(29) 
- 
615 
(4,862) 
46,154 

Deficit 
$ 
(87,722) 
- 
- 
- 
- 
- 
- 
(9,648) 
(97,370) 
- 
- 
- 
- 
- 
- 
- 
(9,532) 
(106,902) 
- 
- 
- 
- 
(4,862) 
(111,764) 

Contributed 
surplus – 
units 
$ 
2,584 
- 
- 
- 
(929) 
(78) 
431 
- 
2,008 
- 
183 
- 
- 
(819) 
(353) 
145 
- 
1,164 
- 
(63) 
(218) 
257 
- 
1,140 

 
 
 
 
 
 
 
Trilogy Metals Inc. 
(An Exploration-Stage Company) 
Consolidated Statements of Cash Flows 
 For the Years Ended November 30 

Cash flows used in operating activities 
Loss for the year 
Items not affecting cash 

Amortization 
Gain on sale of Sunward Investments Ltd. 
Unrealized gain on held for trading investments 
Unrealized foreign exchange loss 
Gain on sale of investments 
Stock-based compensation 

Net change in non-cash working capital 

Decrease (increase) in accounts receivable 
Decrease (increase) in deposits and prepaid amounts 
Increase (decrease) in accounts payable, accrued 

liabilities and due to related parties 

Cash flows from (used in) financing activities 
Proceeds from private placement, net 
Proceeds received on exercise of options 
Proceeds received on exercise of Sunward 

Arrangement Options 

Settlement of Restricted Share Units 

Cash flows from (used in) investing activities 
Acquisition of plant & equipment 
Proceeds from disposition of equipment 
Proceeds from the sale of investments 
Net cash outflow from the disposition of Sunward 

Investments Ltd. 

Cash acquired through Sunward Arrangement 

Increase (decrease) in cash and cash equivalents 
Cash and cash equivalents – beginning of year 
Cash and cash equivalents – end of year 
Less cash and cash equivalents of discontinued 

operations – end of year 

Cash and cash equivalents  of continuing operations 

– end of year 

Non-cash investing and financing activities 
Acquisition of investments from the sale of Sunward 

Investments Ltd. 

Issuance of common shares and arrangement options 

on acquisition of Sunward 

2016 
$ 

(4,862) 

174 
(4,448) 
(88) 
184 
(57) 
615 

(8) 
(59) 
(143) 

(8,692) 

- 
- 
- 

(29) 
(29) 

(122) 
- 
228 
(184) 

- 
(78) 
(8,799) 
16,139 
7,340 
- 

7,340 

2016 
$ 

8,102 

- 

in thousands of US dollars 

2015 
$ 

(9,532) 

355 
- 
- 
- 
- 
831 

156 
(28) 
(217) 

2014 
$ 

(9,648) 

750 
- 
- 
- 
- 
887 

(86) 
16 
(558) 

(8,435) 

(8,639) 

- 
- 
142 

- 
142 

(48) 
7 
- 
- 

19,399 
19,358 
11,065 
5,074 
16,139 
(75) 

16,064 

2015 
$ 

- 

22,959 

7,231 
16 
- 

- 
7,247 

(18) 
- 
- 
- 

- 
(18) 
(1,410) 
6,484 
5,074 
- 

5,074 

2014 
$ 

- 

- 

(See accompanying notes to the consolidated financial statements) 

86 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Trilogy Metals Inc. 
(An Exploration-Stage Company) 
Notes to the Consolidated Financial Statements 

1  Nature of operations  

Trilogy  Metals  Inc.,  formerly  NovaCopper  Inc.,  (“Trilogy”  or  the  “Company”)  was  incorporated  in  British  Columbia  under  the 
Business Corporations Act (BC) on April 27, 2011. The Company changed its name from NovaCopper Inc. to Trilogy Metals Inc. on 
September 1, 2016 to better reflect its diversified metals resource base. The Company is engaged in the exploration and development 
of mineral properties with a focus on the Upper Kobuk Mineral Projects (“UKMP”), including the Arctic and Bornite Projects located 
in Northwest Alaska in the United States of America (“US”).  

2  Summary of significant accounting policies 

Basis of presentation  

These  consolidated  financial  statements  have  been  prepared  using  accounting  principles  generally  accepted  in  the  United  States 
(“U.S. GAAP”)  and  include  the  accounts  of  Trilogy and  its  wholly-owned  subsidiary,  NovaCopper US  Inc.  (“NovaCopper  US”). 
These  consolidated  financial  statements  include  the  accounts  of  Sunward  Resources  Ltd.  (“Sunward”),  Sunward  Investments  Ltd. 
(“Sunward Investments”) and Sunward Resources Limited (“Sunward BVI”) for the period June 19, 2015 to September 1, 2016, as 
applicable. Sunward BVI has registered a branch, Sunward Resources Sucursal Colombia, to do business in Colombia. All significant 
intercompany transactions are eliminated on consolidation.  

On  June  19,  2015,  we  completed  the  acquisition  of  Sunward,  which  held  100%  ownership  in  the  Titiribi  gold-copper  exploration 
project in Colombia through Sunward Investments. Sunward was converted to Sunward Resources Unlimited Liability Company on 
June 19, 2015 and wound-up on February 29, 2016. On September 1, 2016, we completed the sale of Sunward Investments and the 
Titiribi project. 

All figures are in United States dollars unless otherwise noted. References to CDN$ refer to amounts in Canadian dollars. 

These financial statements were approved by the Company’s Board of Directors for issue on February 2, 2017. 

Cash and cash equivalents 

Cash and cash equivalents comprise of highly liquid investments maturing less than 90 days from date of initial investment. Cash and 
cash equivalents are designated as loans and receivables. 

Plant and equipment 

Plant and equipment are recorded at cost and amortization begins when the asset is put into service. Amortization is calculated on a 
straight-line basis over the respective assets’ estimated useful lives. Amortization periods by asset class are:  

Computer hardware and software 
Machinery and equipment  
Office furniture and equipment 
Vehicles  
Leasehold Improvements   

3 years 
3 years 
5 years 
3 years 
lease term 

Mineral properties and development costs 

All direct costs related to the acquisition of mineral property interests are capitalized. Mineral property exploration expenditures are 
expensed  when  incurred.  When  it  has  been  established  that  a  mineral  deposit  is  commercially  mineable,  an  economic  analysis  has 
been completed in accordance with SEC Industry Guide 7 and permits are obtained, the costs subsequently incurred to develop a mine 
on the property prior to the start of mining operations are capitalized. Capitalized costs will be amortized following commencement of 
production using the unit of production method over the estimated life of proven and probable reserves.  

87 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The acquisition of title to mineral properties is a complicated and uncertain process. The Company has taken steps, in accordance with 
industry  standards,  to  verify  the  title  to  mineral  properties  in  which  it  has  an  interest.  Although  the  Company  has  made  efforts  to 
ensure that legal titles to its mining assets are properly recorded, there can be no assurance that such title will be secured indefinitely. 

Impairment of long-lived assets 

Management  assesses  the  possibility  of  impairment  in  the  carrying  value  of  long-lived  assets  whenever  events  or  circumstances 
indicate  that  the  carrying  amounts  of  the  asset  or  asset  group  may  not  be  recoverable.  Management  calculates  the  estimated 
undiscounted future net cash flows relating to the asset or asset group using estimated future prices, proven and probable reserves and 
other  mineral  resources,  and  operating,  capital  and  reclamation  costs.  When  the  carrying  value  of  an  asset  exceeds  the  related 
undiscounted cash flows, the asset is written down to its estimated fair value, which is usually determined using discounted future cash 
flows. Management’s estimates of mineral prices, mineral resources, foreign exchange rates, production levels and operating capital 
and  reclamation  costs  are  subject  to  risk  and  uncertainties  that  may  affect  the  determination  of  the  recoverability  of  the  long-lived 
asset. It is possible that material changes could occur that may adversely affect management’s estimates. 

Income taxes 

The liability method of accounting for income taxes is used and is based on differences between the accounting and tax bases of assets 
and  liabilities.  Deferred  income  tax  assets  and  liabilities  are  recognized  for  temporary  differences  between  the  tax  and  accounting 
basis of assets and liabilities as well as for the benefit of losses available to be carried forward to future years for tax purposes using 
enacted income tax rates expected to be in effect for the period in which the differences are expected to reverse. Deferred income tax 
assets are evaluated and, if realization is not considered more likely than not, a valuation allowance is provided. 

Uncertainty in income tax positions 

The Company recognizes tax benefits from uncertain tax positions only if it is at least more likely than not that the tax position will be 
sustained on examination by the taxing authorities, based on the technical merits of the position. Any tax benefits recognized in the 
financial statements from such a position are measured based on the largest benefit that has a greater than 50% likelihood of being 
realized  upon  settlement  with  the  taxing  authorities.  Related  interest  and  penalties,  if  any,  are  recorded  as  tax  expense  in  the  tax 
provision. 

Financial instruments 

Held-for-trading financial assets and liabilities are recorded at fair value as determined by active market prices or valuation models, as 
appropriate.  Valuation  models  require  the  use  of  assumptions  which  may  include  the  expected  life  of  the  instrument,  the  expected 
volatility, dividend payouts, and interest rates. In determining these assumptions, management uses readily observable market inputs 
where  available  or,  where  not  available,  inputs  generated  by  management.  Changes  in  fair  value  of  held-for-trading  financial 
instruments  are  recorded  in  income  or  loss  for  the  period.  Held-for-trading  financial  assets  consist  of  common  share  and  warrant 
investments in a publicly-held mining company.  

Available-for-sale  financial  assets  are  recorded  at  fair  value  as  determined  by  active  market  prices.  Unrealized  gains  and  losses  on 
available-for-sale  investments  are  recognized  in  other  comprehensive  income.  If  a  decline  in  fair  value  is  deemed  to  be  other  than 
temporary,  the  unrealized  loss  is  recognized  in  net  earnings.  Investments  in  equity  instruments  that  do  not  have  an  active  quoted 
market price are measured at cost. The Company has no available-for-sale financial assets. 

Loans and receivables are recorded initially at fair value, net of transaction costs incurred, and subsequently at amortized cost using 
the effective interest rate method. Loans and receivables consist of cash and cash equivalents, accounts receivable, and deposits. 

Other financial liabilities are recorded initially at fair value and subsequently at amortized cost using the effective interest rate method. 
Other financial liabilities include accounts payable and accrued liabilities. 

Translation of foreign currencies 

Monetary assets and liabilities are translated into United States dollar at the exchange rate in effect at the balance sheet date, and non-
monetary assets and liabilities at the exchange rate in effect at the time of acquisition or issue. Income and expenses are translated at 
rates approximating the exchange rate in effect at the time of transactions. Exchange gains or losses arising on translation are included 
in income or loss for the period. 

The functional currency of the Company and its subsidiaries and the Company’s reporting currency is the United States dollar. 

88 

 
 
 
 
 
 
 
 
 
 
 
Earnings and loss per share 

Earnings and loss per common share is calculated based on the weighted average number of common shares outstanding during the 
year.  The  Company  follows  the  treasury  stock  method  in  the  calculation  of  diluted  earnings  per  share.  Under  the  treasury  stock 
method, the weighted average number of common shares outstanding used for the calculation of diluted loss per share assumes that 
the proceeds to be received on the exercise of dilutive stock options and warrants are used to repurchase common shares at the average 
market price during the period.  

Stock-based compensation 

Compensation expense for options granted to employees, directors and certain service providers is determined based on estimated fair 
values of the options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, 
the fair market value of the shares, expected volatility, expected dividend yield and the risk-free interest rate over the expected life of 
the option. The compensation cost is recognized using the graded attribution method over the vesting period of the respective options. 
The expense relating to the fair value of stock options is included in expenses and is credited to contributed surplus. Shares are issued 
from treasury in settlement of options exercised. 

Compensation  expense  for  restricted  share  units  (“RSUs”)  and  deferred  share  units  (“DSUs”)  granted  to  employees  and  directors, 
respectively, is determined based on estimated fair values of the units at the time of grant using quoted market prices or at the time the 
units  qualify  for  equity  classification  under  ASC  718.  The  cost  is  recognized  using  the  graded  attribution  method  over  the  vesting 
period  of  the  respective  units.  The  expense  relating  to  the  fair  value  of  the  units  is  included  in  expenses  and  is  credited  to  other 
liabilities or contributed surplus based on the unit’s classification. Units may be settled in either i) cash, and/or ii) shares purchased in 
the open market, and/or iii) shares issued from treasury, at the Company’s election at the time of vesting.  

Use of estimates and measurement uncertainties 

The preparation of financial statements in conformity  with U.S. GAAP requires management to make estimates and assumptions of 
future events that affect the reported amount of assets and liabilities and disclosure of contingent liabilities at the date of the financial 
statements,  and  the  reported  amounts  of  expenditures  during  the  period.  Significant  estimates  include  the  basis  of  impairment  of 
mineral properties, accounting for business combinations, income taxes, and the valuation of stock-based compensation. Actual results 
could differ materially from those reported. 

Accounting standards adopted 

Development stage entity 

In June 2014, the FASB issued “Development Stage Entities – Elimination of Certain Financial Reporting Requirements, Including an 
Amendment  to  Variable  Interest  Entities  Guidance  in  Topic  810,  Consolidation”  (“ASU 2014-10”).  ASU  2014-10  eliminates  the 
concept of a development  stage entity, of  which Trilogy had been classified. Upon adoption, certain  financial reporting disclosures 
have been eliminated including the presentation of an inception-to-date statement of income and cash flow. ASU 2014-10 is effective 
for fiscal years, and interim periods within those years, beginning after December 15, 2014. The Company adopted this standard as of 
December  1,  2015.  As  a  result  of  adopting  the  standard,  the  Company  no  longer  includes  the  cumulative  during  exploration  stage 
column previously presented on the statement of loss and comprehensive loss and statement of cash flows.  

Recent accounting pronouncements  

i.  Extraordinary Items 

In January 2015, the FASB issued guidance to eliminate the concept of extraordinary items (“ASU 2015-01”). This will mean 
the Company will not present any items as extraordinary items in the future. This update is effective for annual reporting 
periods beginning after December 15, 2015, and interim periods within those annual periods. We have assessed that there is 
no impact and the Company will adopt the standard beginning December 1, 2016. 

ii.  Leases 

In  February  2016,  the  FASB  issued  new  accounting  requirements  for  accounting  for,  presentation  of,  and  classification  of 
leases (“ASU 2016-02”). This will result in most leases being capitalized as a right of use asset with a related liability on our 
balance sheets. The requirements of the new standard are effective for annual reporting periods beginning after December 15, 

89 

 
 
 
 
 
 
 
 
 
 
 
 
2018, and interim periods  within those annual periods,  which  for us is the  first quarter of  fiscal  year 2020. We expect the 
adoption will have an impact as we expect to capitalize leases that are not currently recognized on the balance sheet and are 
in the process of analyzing the quantitative impact of this guidance on our results of operations and financial position. 

iii.  Stock-based compensation 

In  March  2016,  the  FASB  issued  new  guidance  simplifying  the  accounting  for  stock-based  compensation  transactions, 
including  income  tax  consequences,  classification  of  awards  as  equity  or  liabilities,  forfeitures,  and  classification  on  the 
statement of cash flows (“ASU 2016-09”). This update is effective for annual reporting periods beginning after December 15, 
2016,  and  early  adoption  is  permitted.  We  are  in  the  process  of  analyzing  the  impact  of  this  guidance  on  our  results  of 
operations, financial position, and disclosures. 

3  Sale of Sunward Investments Ltd 

On September 1, 2016, Trilogy completed the sale of Sunward Investments to Brazil Resources Inc. (“BRI”), a public company listed 
on  the  TSX-Venture  exchange,  of  all  of  the  issued  and  outstanding  shares  of  Sunward  Investments  for  consideration  of  5,000,000 
common shares of BRI valued at $7.8 million and 1,000,000 warrants, with each warrant exercisable into one common share of BRI 
for a period of two years at an exercise price of Cdn$3.50, valued at $0.3 million for total consideration of $8.1 million.  On December 
7,  2016,  BRI  changed  its  name  to  GoldMining  Inc.  Of  the  common  shares  received,  2,500,000  common  shares  were  saleable 
immediately with the remaining 2,500,000 common shares saleable six months following the close. Sunward Investments, through a 
subsidiary, owns 100% of the Titiribi gold-copper exploration project located approximately 70 kilometers southwest of the city of 
Medellin, in Antioquia Department, Colombia. Trilogy acquired Sunward Investments and the Titiribi project as part of its acquisition 
of Sunward in a business combination which closed on June 19, 2015 (Note 4).  

The Company recognized a gain on the sale of Sunward Investments of $4.4 million as of September 1, 2016 as outlined below.   

Consideration received 
Cash reimbursement from BRI 
Net assets sold 
Transaction costs  
Gain on sale of Sunward Investments  

in thousands of dollars 

$ 

8,102 
51 
(3,545) 
(160) 
4,448 

The fair value of the common shares received was determined based on the closing price of BRI of $1.56 (CDN$2.04) at the date of 
completion. The fair value of the BRI warrants was determined using the Black-Scholes option pricing model. Assumptions used in 
the pricing model in the measurement of the fair value of the warrants are as follows: 

Risk-free interest rates 
Exercise price 
Expected life 
Expected forfeiture rate 
Expected volatility 
Expected dividends 

0.59% 
CDN$3.50 
2 years 
0% 
66.9% 
Nil 

The common shares and warrants received have been designated as held-for-trading financial assets. 

Following  the  announcement,  the  Company  classified  the  operations  of  Sunward  Investments  as  discontinued  operations, 
retrospectively.  The  following  expenses  comprise  the  discontinued  operations  of  Sunward  Investments  and  substantially  the  entire 
Colombian segment of the Company for the periods of ownership noted.  

90 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
Amortization 
Foreign exchange loss  
General and administrative 
Mineral properties expense  
Professional fees 
Discontinued operations expense for the year 
Gain on sale of Sunward Investments Ltd. 
(Income)/loss from discontinued operations for the year 

4  Acquisition of Sunward Resources Ltd. 

December 1, 2015 - 
September 1, 2016 
$ 
95 
4 
5 
460 
34 
598 
(4,448) 
(3,850) 

in thousands of dollars 
June 19, 2015 – 
November 30, 2015 
$ 
63 
23 
3 
309 
- 
398 
- 
398 

On June 19, 2015, the Company closed a definitive agreement to acquire all of the issued and outstanding common shares of Sunward, 
by  way  of  a  court-approved  plan  of  arrangement  (the  “Sunward  Arrangement”).  Under  the  terms  of  the  Sunward  Arrangement, 
Sunward shareholders received 0.3 of a Trilogy common share for each Sunward common share held. On June 19, 2015, the Company 
issued 43,116,312 common shares of Trilogy (“Common  Shares”) to  Sunward shareholders and holders of Sunward  deferred share 
units  pursuant  to  the  Sunward  Arrangement.    Each  Sunward  stock  option  outstanding  was  exchanged  for  a  fully-vested  option 
(“Sunward Arrangement Option”) to purchase Trilogy Common Shares for a period of 90 days,  with the number of shares issuable 
and exercise price adjusted based on an exchange ratio of 0.3 Trilogy options for each of Sunward’s 8,350,000 options outstanding 
immediately prior to completion of the arrangement.  As a result, 2,505,000 Sunward Arrangement Options  were exchanged for the 
Sunward  options  and  all  have  subsequently  been  exercised  or  expired.  Consideration  transferred  to  consummate  the  Sunward 
Arrangement comprised of the issuance of 43,116,312 Common Shares valued at $22.9 million and 2,505,000 Sunward Arrangement 
options valued at $0.1 million. The value of the Common Shares issued was calculated based on the closing price of Trilogy Common 
Shares  on  June  18,  2015  of  $0.53,  the  date  of  last  trading  prior  to  the  closing  of  the  acquisition.  The  fair  value  of  the  Sunward 
Arrangement Options was determined using the Black-Scholes option pricing model. 

Assumptions used in the pricing model in the measurement of the fair value of the Sunward Arrangement Options are as follows: 

Risk-free interest rates 
Exercise price 
Expected life 
Expected forfeiture rate 
Expected volatility 
Expected dividends 

0.62% 
CDN$0.54-6.27 
0.245 years 
0% 
50.2% 
Nil 

This acquisition has been accounted for as a business combination under ASC 805. The Company incurred $0.8 million in acquisition 
costs  related  to  the  Sunward  Arrangement  which  are  included  in  professional  fees  on  the  consolidated  statement  of  loss  and 
comprehensive loss for the year ended November 30, 2015. 

The following summarizes the consideration and the fair value of assets acquired and liabilities assumed as of the date of acquisition: 

Consideration: 
   Common shares issued (43,116,312 at $0.53 per share) 
   Sunward Arrangement Options  
Total consideration 

Fair value of net assets acquired: 
    Cash 
    Accounts receivable 
    Deposits and prepaid amounts 
    Plant and equipment 
    Mineral properties and developments costs 
    Accounts payable and accrued liabilities 
Net Assets 

in thousands of dollars 
$ 
22,851 
108 
22,959 

19,399 
19 
104 
343 
3,264 
(170) 
22,959 

The consolidated financial statements included herein reflect the results of operations of Sunward since the June 19, 2015 acquisition 
date.  Following  the  announcement  of  the  sale  of  Sunward  Investments  outlined  in  Note  3,  the  operations  have  been  classified  as 
discontinued operations.  

91 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5  Plant and equipment 

British Columbia, Canada 
Furniture and equipment 
Leasehold improvements 
Computer hardware and software 
Alaska, USA 
Machinery, and equipment  
Vehicles 
Computer hardware and software 

British Columbia, Canada 
Furniture and equipment 
Leasehold improvements 
Computer hardware and software 
Alaska, USA 
Machinery, and equipment  
Vehicles 
Computer hardware and software 

6  Mineral properties and development costs 

Alaska, USA 
Ambler (a) 
Bornite (b) 

Alaska, USA 
Ambler (a) 
Bornite (b) 

(a)  Ambler  

in thousands of dollars 

November 30, 2016 

Accumulated 
amortization 
$ 

(33) 
(28) 
(96) 

(2,798) 
(285) 
(31) 
(3,271) 

Accumulated 
amortization 
$ 

(24) 
(20) 
(77) 

(2,777) 
(262) 
(31) 
(3,191) 

Net 
$ 

13 
4 
12 

123 
63 
- 
215 

in thousands of dollars 
November 30, 2015 

Net 
$ 

22 
12 
26 

100 
13 
- 
173 

Cost 
$ 

46 
32 
108 

2,921 
348 
31 
3,486 

Cost 
$ 

46 
32 
103 

2,877 
275 
31 
3,364 

November 30, 2015 
$ 

Acquisition costs  

26,586 
4,000 
30,586 

$ 

- 
- 
- 

November 30, 2014 
$ 

Acquisition costs  

26,586 
4,000 
30,586 

$ 

- 
- 
- 

in thousands of dollars 
November 30, 2016 
$ 

26,586 
4,000 
30,586 

in thousands of dollars 
November 30, 2015 
$ 

26,586 
4,000 
30,586 

On January 11, 2010, NovaGold Resources Inc. (“NovaGold”), through Alaska Gold Company (“AGC”), at the time a wholly-
owned  subsidiary,  purchased  100%  of  the  Ambler  lands  in  Northwest  Alaska,  which  contains  the  copper-zinc-lead-gold-silver 
Arctic  Project  and  other  mineralized  targets  within  the  volcanogenic  massive  sulfide  belt,  through  a  series  of  cash  and  share 
payments. Total fair value of the consideration was $26.6 million. The vendor retained a 1% net smelter return royalty that the 
owner of the property can purchase at any time for a one-time payment of $10.0 million.  

The Ambler lands were acquired on October 17, 2011 by NovaCopper US through a purchase and sale agreement with AGC. On 
October 24, 2011, NovaGold transferred its ownership of NovaCopper US to the Company, then a wholly owned subsidiary of 
NovaGold,  which  was  subsequently  spun-out  to  NovaGold  shareholders  and  publicly  listed  on  April  30,  2012  (“NovaGold 
Arrangement”).  

92 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(b)  Bornite  

On October 19, 2011, NovaCopper US acquired the exclusive right to explore and the non-exclusive right to access and enter on 
the  Bornite  lands,  and  lands  deeded  to  NANA  Regional  Corporation,  Inc.  (“NANA”)  through  the  Alaska  Native  Claims 
Settlement Act, located adjacent to the Ambler lands in Northwest Alaska. As consideration, NovaCopper US paid $4 million to 
acquire  the  right  to  explore  and  develop  the  combined  Upper  Kobuk  Mineral  Projects  through  an  Exploration  Agreement  and 
Option to Lease with NANA. NANA also has the right to appoint a member to Trilogy’s board of directors before April 2017. 
NANA has not exercised their right to appoint a board member at this time. Upon a decision to proceed with construction of a 
mine on the lands, NANA maintains the right to purchase between a 16%-25% ownership interest in the mine or retain a 15% net 
proceeds  royalty  which  is  payable  after  NovaCopper  US  has  recovered  certain  historical  costs,  including  capital  and  cost  of 
capital. Should NANA elect to purchase an ownership interest, consideration will be payable equal to all historical costs incurred 
on the properties at the elected percentage purchased less $40 million, not to be less than zero. The parties  would  form a joint 
venture and be responsible for all future costs, including capital costs of the mine based on their pro-rata share. 

NANA  would also be granted a net smelter return royalty of between 1% and 2.5% upon the execution of a  mining lease or a 
surface use agreement, the amount of which is determined by the classification of land from which production originates. 

(c)  Mineral properties expense 

The following table summarizes mineral properties expense for the years ended November 30, 2016, 2015 and 2014. 

Alaska, USA 
Community 
Drilling 
Engineering 
Environmental 
Geochemistry and geophysics 
Land and permitting 
Other income 
Project support 
Wages and benefits 
Mineral property expense 

2016 
$ 

299 
712 
699 
314 
82 
426 
(34) 
1,254 
1,285 
5,037 

2015 
$ 

126 
698 
441 
88 
70 
421 
(209) 
1,411 
1,122 
4,167 

In thousands of dollars 
2014 
$ 

137 
- 
117 
36 
238 
378 
(9) 
438 
1,177 
2,512 

Mineral property expenses consist of direct drilling, personnel, community, resource reporting and other exploration expenses as 
outlined above, as well as indirect project support expenses such as fixed wing charters, helicopter support, fuel, and other camp 
operation costs. Cumulative mineral properties expense in Alaska from the initial earn-in agreement on the property in 2004 to 
November 30, 2016 is $63.0 million and cumulative acquisition costs are $30.6 million totaling $93.6 million spent to date. 

7  Accounts payable and accrued liabilities 

Trade accounts payable 
Accrued liabilities 
Accrued salaries and vacation  
Accounts payable and accrued liabilities 

November 30, 2016 
$ 
160 
281 
152 
593 

in thousands of dollars 
November 30, 2015 
$ 
161 
442 
109 
 712 

93 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
8  Share capital 

Authorized: 

unlimited common shares, no par value 

November 30, 2013 
Exercise of NovaGold Arrangement Options 
NovaGold Performance Share Units 
Private placement 
Restricted Share Units 
Deferred Share Units 
November 30, 2014 
Issued pursuant to the Sunward Arrangement  
Exercise of options 
Exercise of Sunward Arrangement Options 
Restricted Share Units 
Deferred Share Units 
November 30, 2015 
Exercise of options 
Restricted Share Units 
Deferred Share Units 
November 30, 2016, issued and outstanding 

in thousands of dollars, except share amounts 

Number of shares 

53,066,656 
46,929 
14,166 
6,521,740 
492,501 
154,373 
60,296,365 
43,116,312 
7,499 
347,999 
795,368 
232,878 
104,796,421 
162,854 
108,399 
218,795 
105,286,469 

Ascribed value 
$ 
104,895 
631 
28 
5,068 
929 
282 
111,833 
22,851 
7 
177 
819 
353 
136,040 
65 
34 
218 
136,357 

On April 30, 2012, under the NovaGold Arrangement, Trilogy committed to issue up to 6,181,352 common shares, once vested and 
exercised,  to  satisfy  holders  of  NovaGold  warrants  (“NovaGold  Warrants”),  performance  share  units  (“NovaGold  PSUs”)  and 
deferred  share  units  (“NovaGold  DSUs”)  on  record  as  of  the  close  of  business  April  27,  2012.  When  exercised  or  vested,  Trilogy 
committed  to  deliver  one  Common  Share  to  the  holder  for  every  six  shares  of  NovaGold  the  holder  is  entitled  to  receive,  rounded 
down  to  the  nearest  whole  number.  All  NovaGold  Warrants  have  been  exercised  and  all  NovaGold  PSUs  have  vested.  As  of 
November 30, 2016, 20,685 NovaGold DSUs remain outstanding representing a right  to receive 3,447 Common  Shares in Trilogy, 
which  will  settle  upon  certain  directors  retiring  from  NovaGold’s  board,  and  312,195  NovaGold  Arrangement  Options  remain 
outstanding as disclosed in note 8b.  

Refer to note 4 for a description of Common Shares issued pursuant to the Sunward Arrangement.  All Sunward Arrangement Options 
have been exercised or expired.  

(a)  Stock options 

The  Company  has  a  stock  option  plan  providing  for  the  issuance  of  options  with  a  rolling  maximum  number  equal  to  10%  of  the 
issued and outstanding Common Shares at any given time. The Company may grant options to its directors, officers, employees and 
service  providers.  The  exercise  price  of  each  option  cannot  be  lower  than  the  greater  of  market  price  or  fair  market  value  of  the 
Common Shares (as such terms are defined in the plan) at the date of the option grant. The number of Common Shares optioned to any 
single optionee may not exceed 10% of the issued and outstanding Common Shares at the date of grant. The options are exercisable 
for a maximum of five years from the date of grant, and may be subject to vesting provisions.  

During  the  year  ended  November  30,  2016,  1,785,000  options  (2015  –  3,813,350  options)  at  a  weighted-average  exercise  price  of 
CDN$0.43  (2015  -  CDN$0.55)  were  granted  to  employees,  consultants  and  directors  exercisable  for  a  period  of  five  years  with 
various  vesting  terms  from  immediate  vesting  to  over  a  two  year  period.  The  weighted-average  fair  value  attributable  to  options 
granted in 2016 was $0.13 (2015 - $0.17). 

The fair value of the stock options recognized in the period has been estimated using the Black-Scholes option pricing model.  

94 

 
 
 
 
 
 
 
 
 
 
 
Assumptions used in the pricing model for the period are as provided below. 

Risk-free interest rates 
Exercise price 
Expected life 
Expected volatility 
Expected dividends 

November 30, 2016 
0.52% 
CDN$0.43 
3.0 years 
59.4% 
Nil 

November 30, 2015 
0.42-1.12% 
CDN$0.55 
3.0 years 
56.8-59.5% 
Nil 

November 30, 2014 
1.16% 
CDN$1.22 
3.0 years 
60.2% 
Nil 

The Company recognized a stock option payments charge of $0.4 million for the year ended November 30, 2016 (2015 - $0.7 million; 
2014 - $0.5 million), net of forfeitures.  

As of November 30, 2016, there were 1,401,675 non-vested options outstanding with a weighted average exercise price of $0.37; the 
non-vested stock option expense not yet recognized was $0.05 million. This expense is expected to be recognized over the next two 
years. 

A summary of the Company’s stock option plan and changes during the year ended is as follows: 

Balance – beginning of year 
Granted 
Exercised 
Forfeited 
Balance – end of year 

November 30, 2016 
Weighted average exercise 
price 
$ 
0.57 
0.33 
0.38 
0.58 
0.50 

Number of options  
5,288,350 
1,785,000 
(422,199) 
(601,718) 
6,049,433 

The following table summarizes information about the stock options outstanding at November 30, 2016. 

Range of price 
$0.33 to $0.99 
$1.00 to $1.47 

Number of 
outstanding 
options  
5,994,433 
55,000 
6,049,433 

Weighted 
average years to 
expiry 
3.51 
1.42 
3.49 

Outstanding 
Weighted 
average exercise 
price 
$ 
0.50 
1.47 
0.50 

Exercisable 
Weighted 
average exercise 
price 
$ 
0.53 
1.47 
0.55 

Unvested 

Number of 
unvested options 
1,401,675 
- 
1,401,675 

Number of 
exercisable 
options  
4,592,758 
55,000 
4,647,758 

The aggregate intrinsic value of vested share options (the market value less the exercise price) at November 30, 2016 was $0.6 million 
(2015 - $nil, 2014 - $nil) and the aggregate intrinsic value of exercised options in 2016 was $0.1 million. 

(b)  NovaGold Arrangement Options 

Under the NovaGold Arrangement, holders of NovaGold stock options received one option in Trilogy for every six options held in 
NovaGold  (“NovaGold  Arrangement  Options”).  All  NovaGold  Arrangement  Options  are  vested  and  subject  to  NovaGold’s  stock 
option plan. The options were fully expensed during the year ended November 30, 2014 and no further expense is recognized.  

A summary of the NovaGold Arrangement Options and changes during the year ended is as follows: 

Balance – beginning of year 
Forfeited 
Expired 
Balance – end of year 

95 

November 30, 2015 
Weighted average exercise 
price 
$ 
4.77 
4.68 
5.61 
4.28 

Number of options  
509,272 
(27,199) 
(169,878) 
312,195 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table summarizes information about the NovaGold Arrangement Options outstanding at November 30, 2016. 

Range of price 
$2.75 to $3.99 
$4.00 to $5.99 
$6.00 to $6.48 

Number of outstanding 
options  
49,998 
245,531 
16,666 
312,195 

Weighted average years 
to expiry 
0.33 
0.02 
0.50 
0.09 

Outstanding and exercisable 
Weighted average 
exercise price 
$ 
2.91 
4.41 
6.45 
4.28 

The aggregate intrinsic value of vested NovaGold Arrangement Options (the market value less the exercise price) at November 30, 
2016 was $nil (2015 - $nil, 2014 – $nil). 

(c)  Sunward Arrangement Options  

Under  the  Sunward  Arrangement,  each  Sunward  stock  option  outstanding  was  exchanged  for  a  fully-vested  Sunward  Arrangement 
Option to purchase Trilogy Common Shares for a period of 90 days, such number and exercise price adjusted based on an exchange 
ratio of 0.3 Trilogy options for each Sunward option. A total of 2,505,000 options were exchanged and all were exercised or expired 
during the year ended November 30, 2015. 

During  the  year  ended  November  30,  2015,  347,999  Sunward  Arrangement  Options  were  exercised  for  proceeds  of  approximately 
CDN$188,000 (US$142,000), and 2,157,001 expired.  The aggregate intrinsic  value of  exercised Sunward Arrangement Options in 
2015 was $0.01 million. 

(d)  Restricted Share Units and Deferred Share Units  

The Company has a Restricted Share Unit Plan (“RSU Plan”) and a Non-Executive Director Deferred Share Unit Plan (“DSU Plan”) 
to  provide  long-term  incentives  to  employees,  officers  and  directors.  The  RSU  Plan  and  DSU  Plan  may  be  settled  in  cash  and/or 
Common  Shares  at  the  Company’s  election  with  each  RSU  and  DSU  entitling  the  holder  to  receive  one  common  share  of  the 
Company or equivalent value. All units are accounted for as equity-settled awards. 

On  June  15,  2016,  75,000  DSUs  were  granted  to  a  new  director  which  vested  immediately  and  are  to  be  paid  out  at  the  time  of 
retirement from the Board of Directors. The remaining 164,582 DSUs were granted to directors throughout the year ended November 
30, 2016 based on their election to receive 50% of their annual retainer in DSUs. 

On December 23, 2015, 600,000 RSUs were granted to officers vesting over a two year period. 

A summary of the Company’s unit plans and changes during the year ended is as follows: 

Balance – beginning of year 
Granted 
Vested/paid 
Balance – end of year 

Number of RSUs 
- 
600,000 
(199,999) 
400,001 

Number of DSUs 
904,603 
239,582 
(218,795) 
925,390 

For the year ended November 30, 2016, Trilogy recognized a stock-based compensation charge of $0.3 million (2015 - $0.1 million, 
2014 - $0.4 million), net of forfeitures for RSUs and DSUs.  

(e) Share Purchase Warrants 

A summary of the Company’s warrants and changes during the year ended November 30, 2016 is as follows: 

Balance – beginning of year 
Balance – end of year 

Number of Warrants 

6,521,740 
6,521,740 

Weighted average 
years to expiry 
2.60 
2.60 

Weighted average 
exercise price  
$ 
1.60 
1.60 

96 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9  Management of capital risk 

The Company relies upon management to manage capital in order to accomplish the objectives of safeguarding the Company’s ability 
to  continue  as  a  going  concern  in  order  to  pursue  the  development  of  its  mineral  properties  and  maintain  a  capital  structure  which 
optimizes the costs of capital at an acceptable risk. The Company’s current capital consists of equity funding through capital markets, 
cash acquired from the Sunward Arrangement, and the sale of marketable securities.  

As the Company is currently in the exploration phase none of its financial instruments are exposed to commodity price risk; however, 
the Company’s ability to obtain long-term financing and its economic viability may be affected by commodity price volatility. 

To  facilitate  the  management  of  its  capital  requirements,  the  Company  prepares  annual  expenditure  budgets  that  are  updated  as 
necessary depending on various factors, including successful capital deployment and general industry conditions.  

10  Financial instruments 

The Company is exposed to a variety of risks arising from financial instruments. These risks and management’s objectives, policies 
and procedures for managing these risks are disclosed as follows. 

The Company’s financial instruments consist of cash and cash equivalents, accounts receivable, deposits, investments, and accounts 
payable and accrued liabilities. The fair value of the Company’s financial instruments approximates their carrying value due to the 
short-term nature of their maturity. The Company’s financial instruments initially measured at fair value and then held at amortized 
cost include cash and cash equivalents, accounts receivable, deposits, and accounts payable and accrued liabilities.  The Company’s 
investments are held for trading and are marked-to-market at each period end with changes in fair value recorded to the statement of 
loss.  

Financial risk management 

The Company’s activities expose them  to certain financial  risks, including currency risk, credit risk, liquidity risk, interest risk and 
price risk. 

(e)  Currency risk 

Currency risk is the risk of a fluctuation in financial asset and liability settlement amounts due to a change in foreign exchange rates. 
The Company operates in the United States, Canada, and previously operated in Colombia with some expenses incurred in Canadian 
dollars  and  Colombian  pesos.  The  Company’s  exposure  to  currency  risk  at  November  30,  2016  is  limited  to  the  Canadian  dollar 
(“CDN”) consisting of cash of CDN$451,000, accounts receivable of CDN$32,000, deposit amounts of CDN$146,000, investments of 
CDN$10,521,000  and  accounts  payable  of  CDN$528,000. Based  on  a  1%  change  in  the  US-Canadian  exchange  rate,  assuming  all 
other variables remain constant, the Company’s net loss would change by approximately $79,000.  

(f)  Credit risk 

Credit  risk  is  the  risk  of  an  unexpected  loss  if  a  customer  or  third  party  to  a  financial  instrument  fails  to  meet  its  contractual 
obligations. The Company holds cash and cash equivalents with Canadian Chartered financial institutions. The Company’s accounts 
receivable  consist  of  GST  receivable  from  the  Federal  Government  of  Canada  and  other  receivables  for  recoverable  expenses.  The 
Company’s  exposure  to  credit  risk  is  equal  to  the  balance  of  cash  and  cash  equivalents  and  accounts  receivable  as  recorded  in  the 
financial statements. 

(g)  Liquidity risk 

Liquidity risk is the risk that the Company will encounter difficulties raising funds to meet its financial obligations as they fall due. 
The Company is in the exploration stage and does not have cash inflows from operations; therefore, the Company manages liquidity 
risk through the management of its capital structure and financial leverage.  

97 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Contractually obligated cash flow requirements as at November 30, 2016 are as follows. 

Accounts payable and accrued liabilities 
Office lease (note 12) 

(h)  Interest rate risk 

Total 
$ 
593 
75 
668 

< 1 Year 
$ 
593 
75 
668 

1–2 Years 
$ 
- 
- 
- 

2–5 Years 
$ 
- 
- 
- 

in thousands of dollars 
Thereafter 
$ 
- 
- 
- 

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market 
interest  rates.  The  Company  is  exposed  to  interest  rate  risk  with  respect  to  interest  earned  on  cash  and  cash  equivalents.  Based  on 
balances as at November 30, 2016, a 1% change in interest rates  would result in a change in net loss of $0.1 million, assuming all 
other variables remain constant. 

As  we  are  currently  in  the  exploration  phase  none  of  our  financial  instruments  are  exposed  to  commodity  price  risk;  however,  our 
ability to obtain long-term financing and its economic viability could be affected by commodity price volatility.  

Fair value accounting 

Financial  instruments  measured  at  fair  value  are  classified  into  one  of  three  levels  in  the  fair  value  hierarchy  according  to  the 
significance of the inputs used in making the measurement. The three levels of the fair value hierarchy are as follows:  

Level 1 — Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted 
assets or liabilities;  
Level  2  —  Quoted  prices  in  markets  that  are  not  active,  or  inputs  that  are  observable,  either  directly  or  indirectly,  for 
substantially the full term of the asset or liability; and  
Level  3  —  Prices  or  valuation  techniques  that  require  inputs  that  are  both  significant  to  the  fair  value  measurement  and 
unobservable (supported by little or no market activity) 

The levels in the fair value hierarchy into which the Company’s financial assets and liabilities that are measured and recognized at fair 
value on a recurring basis were categorized as follows: 

Current investments – shares 
Investments – warrants 

 November 30, 2016 
$ 
Level 3 
- 
297 

Level 2 
- 
- 

Level 1 
7,538 
- 

Level 1 
- 
- 

in thousands of dollars 
 November 30, 2015 
$ 
Level 3 
- 
- 

Level 2 
- 
- 

The Company’s investments consist of shares and warrants in a publicly-held mining company. The share investments are recorded as 
current  investments  and  are  valued  using  quoted  market  prices  in  active  markets  and  as  such  are  classified  as  a  Level  1  financial 
instrument. The warrants are valued using a Black-Scholes pricing model and are considered a Level 3 financial instrument because 
the valuation models have significant unobservable inputs. 

11  Income taxes  

Income tax expense differs from the amount that would result from applying the Canadian federal and provincial income tax rates to 
earnings before income taxes. These differences result from the following items: 

98 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Combined federal and provincial statutory tax rate 
Income taxes at statutory rate 
Difference in foreign tax rates 
Effect of foreign exchange changes 
Non-taxable gain on the sale of Sunward Investments  
Non-deductible expenditures 
Return to provision adjustments 
Other 
Disposition of Sunward Investments 
Valuation allowance 
Income tax expense  

November 30, 2016 
$ 
26.00% 
(1,264) 
(750) 
(339) 
(545) 
175 
(510) 
(68) 
7,051 
(3,750) 
- 

November 30, 2015 
$ 
26.00% 
(2,479) 
(680) 
2,264 
- 
239 
(102) 
- 
- 
758 
- 

in thousands of dollars 
November 30, 2014 
$ 
26.00% 
(2,508) 
(580) 
- 
- 
243 
(224) 
- 
- 
3,069 
- 

Deferred  income  taxes  arise  from  temporary  differences  in  the  recognition  of  income  and  expenses  for  financial  reporting  and  tax 
purposes. The significant components of deferred income tax assets and liabilities at November 30, 2016 and 2015 are as follows: 

November 30, 2016 
$ 

in thousands of dollars 
November 30, 2015 
$ 

Deferred income tax assets 

Non-capital losses 
Mineral property interest 
Deferred interest  
Property, plant and equipment 
Share issuance costs 
Other deductible temporary differences 

Total deferred tax assets 
Valuation allowance 
Net deferred income tax assets 
Deferred income tax liabilities 
Mineral property interest 
Other taxable temporary differences 

Deferred income tax liabilities 
Net deferred income tax assets  

58,204 
14,491 
9,040 
47 
126 
450 
82,358 
(82,344) 
14 

- 
(14) 
(14) 
- 

63,397 
14,116 
9,040 
61 
198 
575 
87,387 
(86,094) 
1,293 

(1,109) 
(184) 
(1,293) 
- 

The Company has loss carry-forwards of approximately $153.1 million that may be available for tax purposes. Certain of these losses 
occurred prior to the incorporation of the Company and are accounted for in the financial statements as if they were incurred by the 
Company,  as  described  in  note  1.  Prior  to  the  NovaGold  Arrangement,  the  Company  undertook  a  tax  reorganization  in  order  to 
preserve  the  future  deductibility  of  these  losses  for  the  Company,  subject  to  the  limitations  below.  Deferred  tax  assets  have  been 
recognized to the extent of future taxable income and the future taxable amounts related to taxable temporary differences for which a 
deferred tax liability is recognized can be offset. A valuation allowance has been provided against deferred income tax assets where it 
is not more likely than not that the Company will realize those benefits.  

The losses expire as follows in the following jurisdictions:  

2017 
2018 
2019 
2020 
Thereafter 

Non-capital losses 
Canada 
$ 
- 
- 
- 
- 
31,262  
31,262 

in thousands of dollars 
Operating losses 
United States 
$ 
- 
4,206 
975 
830 
115,797 
121,808 

Future  use  of  U.S.  loss  carry-forwards  is  subject  to  certain  limitations  under  provisions  of  the  Internal  Revenue  Code  including 
limitations subject to Section 382, which relates to a 50% change in control over a three-year period, and are further dependent upon 
the Company attaining profitable operations. An ownership change under Section 382 occurred on January 22, 2009 regarding losses 
incurred by AGC, of which the attributes of those losses were transferred to NovaCopper US with the purchase of the mineral property 

99 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
in  October  2011.  Therefore,  approximately  $39.4 million  of  the  U.S.  losses  above  are  subject  to  limitation  under  Section 382. 
Accordingly, the Company’s ability to use these losses may be limited. 

An additional change in control may have occurred after November 30, 2011 which may further limit the availability of losses prior to 
the date of change in control. 

On  June  19,  2015,  we  completed  the  Sunward  acquisition  which  resulted  in  an  acquisition  of  control  of  Sunward  Resources  ULC 
under of the Income Tax Act in Canada. Therefore, the Company’s ability to use approximately $15.2 million of losses in Canada may 
be limited. 

12  Commitment 

The Company has commitments in respect of office leases requiring future minimum lease payments as follows: 

2017 
Total 

13  Subsequent events 

in thousands of dollars 
November 30, 2016 
$ 
75 
75 

On  January  30,  2017,  the  Company  entered  into  a  commitment  to  lease  office  space  for  a  period  of  seven  years  with  a  total 
commitment of $1.3 million.  

On  December  15,  2016,  525,000  stock  options  were  granted  to  directors  vesting  immediately  and  1,070,000  stock  options  were 
granted to employees vesting equally in thirds on the grant date, the first anniversary of the grant date, and the second anniversary of 
the grant date. Also on December 15, 2016, 600,000 RSUs were granted to officers vesting equally in thirds on the grant date, the first 
anniversary of the grant date, and the second anniversary of the grant. The first tranche of the RSUs vesting on December 15, 2016 
were settled through the issuance of 104,599 Common Shares and cash payment of $0.06 million used to satisfy payroll withholding 
taxes. 

On December 23, 2016, 200,000 RSUs vested and were settled through the issuance of 104,599 Common Shares and cash payment of 
$0.06 million used to satisfy payroll withholding taxes. 

100 

 
 
 
 
 
 
 
 
 
 
 
 
 
Item 9.  CHANGES  IN  AND  DISAGREEMENTS  WITH  ACCOUNTANTS  ON  ACCOUNTING  AND  FINANCIAL 

DISCLOSURE 

None. 

Item 9A.  CONTROLS AND PROCEDURES 

Disclosure Controls and Procedures 

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted by the 
Company  under  U.S.  and  Canadian  securities  legislation  is  recorded,  processed,  summarized  and  reported  within  the  time  periods 
specified  in  those  rules,  including  providing  reasonable  assurance  that  material  information  is  gathered  and  reported  to  senior 
management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to permit timely 
decisions regarding public disclosure. Management, including the CEO and CFO, has evaluated the effectiveness of the design and 
operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and15d-15(e) of the Exchange Act and 
the  rules  of  Canadian  Securities  Administration,  as  at  November 30, 2016.  Based  on  this  evaluation,  the  CEO  and  CFO  have 
concluded that the Company’s disclosure controls and procedures were effective.  

Internal Control over Financial Reporting 

Management  is  responsible  for  establishing  and  maintaining  adequate  internal  control  over  financial  reporting  as  defined  in 
Rule 13a-15(f) and 15d-15(f) of the Exchange Act and National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and 
Interim  filings.  Any  system  of  internal  control  over  financial  reporting,  no  matter  how  well  designed,  has  inherent  limitations. 
Therefore, even those systems determined to be effective can provide only reasonable assurance  with respect to financial statement 
preparation  and  presentation.  Management  has  used  the  Committee  of  Sponsoring  Organizations  of  the  Treadway  Commission  in 
Internal  Control  –  Integrated  Framework  (2013)  to  evaluate  the  effectiveness  of  the  Company’s  internal  control  over  financial 
reporting. Based on this assessment, management has concluded that as at November 30, 2016, the Company’s internal control over 
financial reporting was effective.  

Attestation Report of the Registered Public Accounting Firm 

This annual report does not include an attestation report of the company’s registered public accounting firm regarding internal control 
over  financial  reporting.    As  a  smaller  reporting  company,  management’s  report  was  not  subject  to  attestation  by  the  company’s 
registered public accounting firm pursuant to Dodd-Frank, which exempts smaller reporting companies from complying with Section 
404(b) of SOX.   

Changes in Internal Controls 

There has been no change in our internal control over financial reporting during the year ended November 30, 2016 that has materially 
affected, or is reasonably likely to materially affect, our internal control over financial reporting. 

Item 9B.  OTHER INFORMATION 

None.

101 

 
 
 
 
 
 
Item 10.  DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE 

PART III 

The  information  in  our  2017  Proxy  Statement  regarding  directors  and  executive  officers  and  Section  16  reporting  information 
appearing under the headings “Election of Directors” and “Information Concerning The Board Of Directors And Executive Officers” 
is incorporated by reference in this section. The information under the heading “Executive Officers of Trilogy” in Part I, Item 1 of this 
Form  10-K  is  also  incorporated  by  reference  in  this  section.  The  information  in  our  2017  Proxy  Statement  regarding  our  Code  of 
Business Conduct and Ethics under the subheading “Ethical Business Conduct” under “Statement of Corporate Governance Practices” 
is also incorporated by reference in this section.  Finally, the information in our 2017 Proxy Statement regarding the Audit Committee 
under the heading “Statement of Corporate Governance Practices” is incorporated herein by reference. 

Item 11.  EXECUTIVE COMPENSATION 

The  information  appearing  in  our  2017  Proxy  Statement  under  the  headings  “Compensation  Committee  Interlocks  and  Insider 
Participation”, “Statement of Executive Compensation”, and “Director Compensation” is incorporated by reference in this section. 

Item 12.  SECURITY  OWNERSHIP  OF  CERTAIN  BENEFICIAL  OWNERS  AND  MANAGEMENT  AND  RELATED 

STOCKHOLDER MATTERS 

The  information  appearing  in  our  2017  Proxy  Statement  under  the  heading  “Securities  Authorized  For  Issuance  Under  Equity 
Compensation  Plans”  (which  is  also  contained  in  this  report  in  Part  II,  Item  5)  and  the  information  under  the  heading  “Security 
Ownership Of Certain Beneficial Owners And Management And Related Shareholder Matters” is incorporated herein by reference.  

Item 13.  CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE 

The  information  appearing  in  our  2017  Proxy  Statement  under  the  heading  “Independence  of  Directors”  under  the  heading 
“Information  Concerning  The  Board  Of  Directors  And  Executive  Officers”  and  under  the  heading  “Statement  of  Corporate 
Governance Practices” is incorporated herein by reference.  

Item 14.  PRINCIPAL ACCOUNTANT FEES AND SERVICES 

The  information  appearing  in  our  2017  Proxy  Statement  regarding  Audit  Fees,  Audit-Related  Fees,  Tax  Fees,  All  Other  Fees  and 
Audit Committee Pre-Approval Policies under the subheading “Appointment of Auditors” is incorporated herein by reference. 

102 

 
 
Item 15.  EXHIBITS AND FINANCIAL STATEMENT SCHEDULES 

PART IV 

 (a)  

Documents Filed With This Report 

1. 

FINANCIAL STATEMENTS 

Report of Independent Registered Public Accounting Firm  

Consolidated Balance Sheets  

Consolidated Statements of Loss and Comprehensive Loss  

Consolidated Statements of Shareholders’ Equity  

Consolidated Statements of Cash Flows  

Notes to Consolidated Financial Statements  

Page 

82 

83 

84 

85 

86 

87 

2. 

FINANCIAL STATEMENT SCHEDULES 

None. 

3. 

EXECUTIVE COMPENSATION PLANS AND ARRANGEMENTS 

NovaCopper Inc. Equity Incentive Plan identified in exhibit list below. 

Employment Agreement between the Registrant and Rick Van Nieuwenhuyse, dated January 9, 2012, identified in exhibit list 
below. 

Employment Agreement between the Registrant and Elaine Sanders, dated November 5, 2012, identified in exhibit list below. 

2004 Stock Award Plan of NovaGold Resources Inc. (as amended) identified in exhibit list below. 

NovaGold 2009 Performance Share Unit Plan identified in exhibit list below. 

NovaGold 2009 Deferred Share Unit Plan identified in exhibit list below. 

NovaCopper Inc. 2012 Restricted Share Unit Plan identified in exhibit list below. 

NovaCopper Inc. 2012 Deferred Share Unit Plan identified in exhibit list below. 

(b) 

Exhibits 

Exhibit 
No. 
3.1 

3.2 

3.3 

Description 
Certificate  of  Incorporation  (incorporated  by  reference  Exhibit  99.2  to  the  Registration  Statement  on  Form  40-F  as 
filed on March 1, 2012, File No. 001-35447)  

Articles  of  Trilogy  Metals  Inc.,  effective  April  27,  2011,  as  altered  March  20,  2011  (incorporated  by  reference  to 
Exhibit 99.3 to Amendment  No. 1 to the Registration Statement on Form 40-F as  filed  on  April 19, 2012, File No. 
001-35447) 

Notice of Articles and Certificate of Name Change, dated September 1, 2016 (incorporated by reference to Exhibit 3.1 
to the Form 8-K dated September 8, 2016) 

103 

 
 
 
 
 
Exhibit 
No. 
10.1 

10.2 

10.3 

10.4 

10.5 

10.6 

10.7 

10.8 

10.9 

10.10 

10.11 

10.12 

10.13 

10.14 

21.1 

23.1 

23.2 

23.3 

23.4 

23.5 

23.6 

31.1 

31.2 

Description 
Commitment  Agreement  between  NovaGold  Resources  Inc.  and  Trilogy  Metals  Inc.  dated  effective  April  19,  2012 
(incorporated by reference to Exhibit 99.1 to the Form 6-K dated April 25, 2012) 

Exploration  Agreement  and  Option  to  Lease  between  NovaCopper  US  Inc.  and  NANA  Regional  Corporation,  Inc. 
dated October 19, 2011(incorporated by reference to Exhibit 99.1 to the Form 6-K dated April 25, 2012) 

Net Smelter Returns Royalty Agreement among Kennecott Exploration Company, Kennecott Arctic Company, Alaska 
Gold Company, and NovaGold Resources Inc. dated effective January 7, 2010 (incorporated by reference to Exhibit 
99.1 to the Form 6-K dated April 25, 2012) 

Employment Agreement between the Registrant and Rick Van Nieuwenhuyse, dated January 9, 2012 (incorporated by 
reference  to  Exhibit  4.4  of  the  Registrant’s  registration  statement  on  Form  S-8  as  filed  on  April  27,  2012,  File  No. 
333-181020) 

Employment  Agreement  between  the  Registrant  and  Elaine  Sanders,  dated  November  5,  2012  (incorporated  by 
reference to Exhibit 10.5 to the  Registration Statement on  Form 10-K as  filed on February 12, 2013, File No. 001-
35447) 

2004  Stock  Award  Plan  of  NovaGold  Resources  Inc.  (as  amended)  (incorporated  by  reference  to  Appendix  A  of 
Exhibit 99.2 of NovaGold Resources Inc.’s report on Form 6-K as filed on April 29, 2009), as amended pursuant to 
the Plan of Arrangement (incorporated by reference to Exhibit 99.1 of NovaGold Resources Inc.’s report on Form 6-K 
as filed on March 1, 2012) 

NovaGold 2009 Performance Share Unit Plan (incorporated by reference to Appendix C of Exhibit 99.2 of NovaGold 
Resources  Inc.’s  report  on  Form  6-K  as  filed  on  April  29, 2009),  as  amended  pursuant  to  the  Plan  of  Arrangement 
(incorporated  by  reference  to  Exhibit  99.1  of  NovaGold  Resources  Inc.’s  report  on  Form  6-K  as  filed  on  March  1, 
2012) 

NovaGold  2009  Deferred  Share  Unit  Plan  (incorporated  by  reference  to  Appendix  E  of  Exhibit  99.2  of  NovaGold 
Resources  Inc.’s  report  on  Form  6-K  as  filed  on  April  29, 2009),  as  amended  pursuant  to  the  Plan  of  Arrangement 
(incorporated  by  reference  to  Exhibit  99.1  of  NovaGold  Resources  Inc.’s  report  on  Form  6-K  as  filed  on  March  1, 
2012) 

Form  of  NovaCopper  Inc.  Stock  Option  Agreement  (incorporated  by  reference  to  Exhibit  4.5  of  the  Registrant’s 
registration statement on Form S-8 as filed on April 27, 2012, File No. 333-181020) 

NovaCopper  Inc.  2012  Restricted  Share  Unit  Plan  (incorporated  by  reference  to  Exhibit  10.11  to  the  Registration 
Statement on Form 10-K as filed on February 12, 2013, File No. 001-35447) 
NovaCopper  Inc.  2012  Deferred  Share  Unit  Plan  (incorporated  by  reference  to  Exhibit  10.12  to  the  Registration 
Statement on Form 10-K as filed on February 12, 2013, File No. 001-35447) 
Form of Unit Subscription Agreement (incorporated by reference to Exhibit 99.3 to the Form 8-K filed July 8, 2014) 

Form of Warrant (incorporated by reference to Exhibit 99.4 to the Form 8-K filed July 8, 2014) 

Arrangement  Agreement,  dated  April  22,  2015,  between  NovaCopper  and  Sunward  (incorporated  by  reference  to 
Exhibit 2.1 to the Form 8-K filed on April 27, 2015) 
Subsidiaries of the Registrant 

Consent of PricewaterhouseCoopers LLP 

Consent of Erin Workman 

Consent of Tetra Tech 

Consent of BD Resource Consulting, Inc. 

Consent of SIM Geological Inc. 

Consent of International Metallurgical & Environmental Inc. 

Certification of the Chief Executive Officer required by Rule 13a-14(a) or Rule 15d-14(a) 

Certification of the Chief Financial Officer required by Rule 13a-14(a) or Rule 15d-14(a) 

104 

 
 
Exhibit 
No. 
32.1 

Certification of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350 

Description 

32.2 

Certification of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350 

Item 16.  FORM 10-K SUMMARY 

None. 

105 

 
 
 
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused 

this report to be signed on its behalf by the undersigned, thereunto duly authorized. 

SIGNATURES 

TRILOGY METALS INC. 

By:  /s/ Rick Van Nieuwenhuyse 

Name:  Rick Van Nieuwenhuyse 
Title:  President and Chief Executive Officer 

Date: February 2, 2017 

Pursuant  to  the  requirements  of  the  Securities  Exchange  Act  of  1934,  this  report  has  been  signed  below  by  the  following 

persons on behalf of the registrant and in the capacities and on the dates indicated: 

Signature 

Title 

Date 

/s/ Rick Van Nieuwenhuyse 
Rick Van Nieuwenhuyse  

  President,  Chief  Executive  Officer  and 

   February 2, 2017 

Director (Principal Executive Officer) 

/s/ Elaine Sanders 
Elaine Sanders 

 /s/ Tony Giardini   
Tony Giardini 

/s/ William Hayden 
William Hayden 

 /s/ Gregory Lang 
Gregory A. Lang 

 /s/ Kalidas Madhavpeddi 
Kalidas V. Madhavpeddi 

/s/ Gerald McConnell 
Gerald McConnell   

/s/ Janice Stairs 
Janice Stairs   

/s/ Diana Walters 
Diana Walters 

  Chief Financial Officer (Principal Financial 
Officer and Principal Accounting Officer) 

   February 2, 2017 

  Director 

  Director 

  Director 

February 2, 2017 

February 2, 2017 

February 2, 2017 

  Director and Authorized US Representative 

February 2, 2017 

February 2, 2017 

February 2, 2017 

February 2, 2017 

  Director 

  Director 

  Director 

106 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 21.1 

SUBSIDIARIES OF THE REGISTRANT 

Name of Subsidiary 

Jurisdiction of Organization  

NovaCopper US Inc. ……………………………………….  Delaware 

107 

 
 
 
 
 
 
 
 
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM 

We hereby consent to the incorporation by reference in the Registration Statements on Forms S-8 (No. 333-208149, No. 333-205102, 
No.  333-188950,  and  No.  333-181020)  of  Trilogy  Metals  Inc.  of  our  report  dated  February  2,  2017,  relating  to  the  consolidated 
financial statements which appears in this Annual Report on Form 10-K for the year ended November 30, 2016.  

Exhibit 23.1 

/s/ PricewaterhouseCoopers LLP 

Chartered Professional Accountants  
Vancouver, British Columbia 
February 2, 2017

108 

 
 
 
Exhibit 23.2 

CONSENT OF ERIN WORKMAN 

I  hereby  consent  to  the  inclusion  in  this  Annual  Report  on  Form  10-K,  which  is  being  filed  with  the  United  States 
Securities and Exchange Commission, of references to my name and to the use of the technical information included in 
the “Arctic Project” and the “Bornite Project” sections, in Trilogy Metals Inc.’s Annual Report on Form 10-K for the year 
ended November 30, 2016. 

I also consent to the incorporation by reference in Trilogy Metals Inc.’s Registration Statements on Form S-8 (No. 333-
208149, No. 333-205102, No. 333-188950, and No. 333-181020), of references to my name and to the use of the technical 
information included in the Annual Report on Form 10-K as described above. 

DATED: February 2, 2017 

 /s/ Erin Workman 
Name: Erin Workman  

109 

 
 
 
 
 
 
 
 
  
   
  
   
  
  
  
 
CONSENT OF TETRA TECH 

Exhibit 23.3 

We  hereby  consent  to  the  inclusion  in  this  Annual  Report  on  Form  10-K,  which  is  being  filed  with  the  United  States 
Securities and Exchange Commission, of references to our name and to the use of the technical report titled “Preliminary 
Economic  Assessment  Report  on  the  Arctic  Project,  Ambler  Mining  District  Northwest  Alaska”  dated  effective 
September 12, 2013 (the “Technical Report”). 

We also consent to the incorporation by reference in Trilogy Metals Inc.’s Registration Statements on Form S-8 (No. 333-
208149,  No.  333-205102,  No.  333-188950,  and  No.  333-181020),  of  references  to  our  name  and  to  the  use  of  the 
Technical Report, which is included in the Annual Report on Form 10-K. 

DATED: February 2, 2017 

/s/ Hassan Ghaffari 
Name: Tetra Tech  

110 

 
 
 
 
 
 
  
   
  
   
  
  
  
 
Exhibit 23.4 

CONSENT OF BD RESOURCE CONSULTING, INC. 

We  hereby  consent  to  the  inclusion  in  this  Annual  Report  on  Form  10-K,  which  is  being  filed  with  the  United  States 
Securities and Exchange Commission, of references to our name and to the use of the technical report titled “NI 43-101 
Technical  Report  on  the  Bornite  Project,  Northwest  Alaska,  USA”  dated  effective  April  19,  2016  (the  “Technical 
Report”). 

We also consent to the incorporation by reference in Trilogy Metals Inc.’s Registration Statements on Form S-8 (No. 333-
208149,  No.  333-205102,  No.  333-188950,  and  No.  333-181020),  of  references  to  our  name  and  to  the  use  of  the 
Technical Report, which is included in the Annual Report on Form 10-K. 

DATED: February 2, 2017 

 /s/ Bruce Davis 
Name: BD Resource Consulting, Inc.  

111 

 
 
 
 
 
 
 
  
   
  
   
  
  
  
 
CONSENT OF SIM GEOLOGICAL INC. 

Exhibit 23.5 

We  hereby  consent  to  the  inclusion  in  this  Annual  Report  on  Form  10-K,  which  is  being  filed  with  the  United  States 
Securities and Exchange Commission, of references to our name and to the use of the technical report titled “NI 43-101 
Technical  Report  on  the  Bornite  Project,  Northwest  Alaska,  USA”  dated  effective  April  19,  2016  (the  “Technical 
Report”). 

We also consent to the incorporation by reference in Trilogy Metals Inc.’s Registration Statements on Form S-8 (No. 333-
208149,  No.  333-205102,  No.  333-188950,  and  No.  333-181020),  of  references  to  our  name  and  to  the  use  of  the 
Technical Report, which is included in the Annual Report on Form 10-K. 

DATED: February 2, 2017 

/s/ Robert Sim 
Name: SIM Geological Inc.  

112 

 
 
 
 
 
 
 
  
   
  
   
  
  
  
 
Exhibit 23.6 

CONSENT OF INTERNATIONAL METALLURGICAL & ENVIRONMENTAL INC. 

We  hereby  consent  to  the  inclusion  in  this  Annual  Report  on  Form  10-K,  which  is  being  filed  with  the  United  States 
Securities and Exchange Commission, of references to our name and to the use of the technical report titled “NI 43-101 
Technical  Report  on  the  Bornite  Project,  Northwest  Alaska,  USA”  dated  effective  April  19,  2016  (the  “Technical 
Report”). 

We also consent to the incorporation by reference in Trilogy Metals Inc.’s Registration Statements on Form S-8 (No. 333-
208149,  No.  333-205102,  No.  333-188950,  and  No.  333-181020),  of  references  to  our  name  and  to  the  use  of  the 
Technical Report, which is included in the Annual Report on Form 10-K. 

DATED: February 2, 2017 

/s/ Jeff Austin 
Name: International Metallurgical & Environmental Inc.  

113 

 
 
 
 
 
 
 
  
   
  
   
  
  
  
CERTIFICATION OF CHIEF EXECUTIVE OFFICER 

PURSUANT TO RULE 13a-14(a) OF THE 

SECURITIES EXCHANGE ACT OF 1934 

 Exhibit 31.1 

I, Rick Van Nieuwenhuyse, certify that: 

1. I have reviewed this annual report on Form 10-K of Trilogy Metals Inc.; 

2.  Based  on  my  knowledge,  this  report  does  not  contain  any  untrue  statement  of  a  material  fact  or  omit  to  state  a  material  fact 
necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with 
respect to the period covered by this report; 

3.  Based  on  my  knowledge,  the  financial  statements,  and  other  financial  information  included  in  this  report,  fairly  present  in  all 
material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in 
this report; 

4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures 
(as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act 
Rules 13a-15(f) and 15d-15(f)) for the registrant and have: 

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under 
our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to 
us by others within those entities, particularly during the period in which this report is being prepared; 

(b)  Designed  such  internal  control  over  financial  reporting,  or  caused  such  internal  control  over  financial  reporting  to  be 
designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of 
financial statements for external purposes in accordance with generally accepted accounting principles; 

(c)  Evaluated  the  effectiveness  of  the  registrant’s  disclosure  controls  and  procedures  and  presented  in  this  report  our 
conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based 
on such evaluation; and 

(d)  Disclosed  in  this  report  any  change  in  the  registrant's  internal  control  over  financial  reporting  that  occurred  during  the 
registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, 
or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and 

5.  The  registrant’s  other  certifying  officer(s)  and  I  have  disclosed,  based  on  our  most  recent  evaluation  of  internal  control  over 
financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the 
equivalent functions): 

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting 
which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; 
and 

(b)  Any  fraud,  whether  or  not  material,  that  involves  management  or  other  employees  who  have  a  significant  role  in  the 

registrant’s internal control over financial reporting. 

Date: February 2, 2017 

By:  

/s/ Rick Van Nieuwenhuyse 

Rick Van Nieuwenhuyse 
Chief Executive Officer 

114 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CERTIFICATION OF CHIEF FINANCIAL OFFICER 

PURSUANT TO RULE 13a-14(a) OF THE 

SECURITIES EXCHANGE ACT OF 1934 

Exhibit 31.2 

I, Elaine Sanders, certify that: 

1. I have reviewed this annual report on Form 10-K of Trilogy Metals Inc.; 

2.  Based  on  my  knowledge,  this  report  does  not  contain  any  untrue  statement  of  a  material  fact  or  omit  to  state  a  material  fact 
necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with 
respect to the period covered by this report; 

3.  Based  on  my  knowledge,  the  financial  statements,  and  other  financial  information  included  in  this  report,  fairly  present  in  all 
material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in 
this report; 

4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures 
(as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act 
Rules 13a-15(f) and 15d-15(f)) for the registrant and have: 

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under 
our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to 
us by others within those entities, particularly during the period in which this report is being prepared; 

(b)  Designed  such  internal  control  over  financial  reporting,  or  caused  such  internal  control  over  financial  reporting  to  be 
designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of 
financial statements for external purposes in accordance with generally accepted accounting principles; 

(c)  Evaluated  the  effectiveness  of  the  registrant’s  disclosure  controls  and  procedures  and  presented  in  this  report  our 
conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based 
on such evaluation; and 

(d)  Disclosed  in  this  report  any  change  in  the  registrant's  internal  control  over  financial  reporting  that  occurred  during  the 
registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, 
or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and 

5.  The  registrant’s  other  certifying  officer(s)  and  I  have  disclosed,  based  on  our  most  recent  evaluation  of  internal  control  over 
financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the 
equivalent functions): 

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting 
which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; 
and 

(b)  Any  fraud,  whether  or  not  material,  that  involves  management  or  other  employees  who  have  a  significant  role  in  the 

registrant’s internal control over financial reporting. 

Date: February 2, 2017 

By:  

/s/ Elaine Sanders 

Elaine Sanders 
Chief Financial Officer 

115 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 32.1 

CERTIFICATION PURSUANT TO 

18 U.S.C. §1350, 

AS ADOPTED PURSUANT TO 

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002 

In connection with the Annual Report of Trilogy Metals Inc. (the “Company”) on Form 10-K for the year ended November 30, 2016, 
as filed with the Securities and Exchange Commission on the date hereof (the “Report”), I, Rick Van Nieuwenhuyse, Chief Executive 
Officer of the Company, certify that: 

1. The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and 

2.  The  information  contained  in  the  Report  fairly  presents,  in  all  material  respects,  the  financial  condition  and  results  of 

operations of the Company. 

Date: February 2, 2017 

By:  

/s/ Rick Van Nieuwenhuyse 

Rick Van Nieuwenhuyse 
President and Chief Executive Officer 

116 

 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 32.2 

CERTIFICATION PURSUANT TO 

18 U.S.C. §1350, 

AS ADOPTED PURSUANT TO 

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002 

In connection with the Annual Report of Trilogy Metals Inc. (the “Company”) on Form 10-K for the year ended November 30, 2016, 
as filed with the Securities and Exchange Commission on the date hereof (the “Report”), I, Elaine Sanders, Chief Financial Officer of 
the Company, certify that: 

1. The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and 

2.  The  information  contained  in  the  Report  fairly  presents,  in  all  material  respects,  the  financial  condition  and  results  of 

operations of the Company. 

Date: February 2, 2017 

By:  

/s/Elaine Sanders  

Elaine Sanders 
Chief Financial Officer 

117