Suite 2100 - 510 West Georgia 
Street  Vancouver, BC, V6B 0M3 

ANNUAL INFORMATION FORM 

For the year ended December 31, 2016 

March 13, 2017 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Table of Contents 

Cautionary Statement Regarding Forward-Looking Information .......................................................................................3 

Compliance with NI 43-101 ..............................................................................................................................................5 

1 – CORPORATE STRUCTURE .......................................................................................................................................... 10 

1.1 

1.2 

Name, Address and Incorporation ................................................................................................................. 10 

Intercorporate Relationships ......................................................................................................................... 10 

2 – GENERAL DEVELOPMENT OF THE BUSINESS ............................................................................................................. 11 

2.1 

Three Year History ......................................................................................................................................... 11 

3 – DESCRIPTION OF THE BUSINESS ............................................................................................................................... 13 

3.1 

3.2 

General .......................................................................................................................................................... 13 

Material Mineral Properties .......................................................................................................................... 19 

4 – RISK FACTORS .......................................................................................................................................................... 69 

5 – DIVIDENDS AND DISTRIBUTIONS ............................................................................................................................. 79 

6 – DESCRIPTION OF CAPITAL STRUCTURE ..................................................................................................................... 79 

6.1 

General Description of Capital Structure ........................................................................................................ 79 

7 – MARKET FOR SECURITIES ......................................................................................................................................... 80 

8 – DIRECTORS AND OFFICERS ....................................................................................................................................... 81 

8.1 

8.2 

Name and Occupation ................................................................................................................................... 81 

Conflicts of Interest........................................................................................................................................ 83 

9 – AUDIT COMMITTEE INFORMATION .......................................................................................................................... 84 

9.1 

9.2 

9.3 

9.4 

9.5 

Audit Committee Terms of Reference ............................................................................................................ 84 

Composition of the Audit Committee and Relevant Education and Experience ............................................. 84 

Audit Committee Oversight ........................................................................................................................... 84 

Pre-Approval Policies and Procedures............................................................................................................ 85 

External Auditors Service Fees (By Category) ................................................................................................. 85 

10 – LEGAL PROCEEDINGS AND REGULATORY ACTIONS ................................................................................................ 85 

11 – INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS ............................................................. 86 

12 – TRANSFER AGENT AND REGISTRAR ........................................................................................................................ 86 

13 – MATERIAL CONTRACTS .......................................................................................................................................... 86 

14 – INTERESTS OF EXPERTS .......................................................................................................................................... 86 

14.1 

14.2 

Names of Experts ........................................................................................................................................... 86 

Interests of Experts ........................................................................................................................................ 87 

15 – ADDITIONAL INFORMATION .................................................................................................................................. 87 

SCHEDULE A ................................................................................................................................................................... A 

 
 
IN  THIS  ANNUAL  INFORMATION  FORM,  UNLESS  THE  CONTEXT  OTHERWISE  REQUIRES,  THE  “COMPANY”  OR 
“CAPSTONE”  REFERS TO CAPSTONE MINING CORP. AND ITS SUBSIDIARIES. ALL INFORMATION CONTAINED HEREIN IS 
AS OF DECEMBER 31, 2016, UNLESS OTHERWISE STATED. 

Cautionary Statement Regarding Forward-Looking Information 

This Annual  Information  Form,  and  the  documents  incorporated by  reference herein, may  contain “forward-
looking information” within the meaning of Canadian securities legislation and “forward-looking statements” within 
the meaning  of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking 
statements”). These  forward-looking statements are made as of the date of this document and Capstone does not 
intend, and does not assume  any obligation, to update these forward-looking statements, except as required under 
applicable securities legislation. 

Forward-looking statements relate to future events or future performance and reflect our expectations or beliefs 
regarding  future events. Forward-looking statements include, but are not limited to, statements with respect to the 
estimation of  mineral resources and mineral reserves, the realization of mineral reserve estimates, the timing and 
amount of estimated  future production, costs of production, the timing and possible outcome of legal proceedings 
and  regulatory  actions,  and  capital  expenditures,  the  success  of  our  mining  operations,  environmental  risks, 
unanticipated reclamation expenses and title disputes. In certain cases, forward-looking statements can be identified 
by  the  use  of  words  such  as  “plans”,  “expects”,  “budget”,  “scheduled”,  “estimates”,  “forecasts”,  “intends”, 
“anticipates”,  “believes” or variations of such words and phrases, or statements that certain actions, events or 
results “may”, “could”,  “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms 
or comparable terminology.  By their very nature, forward-looking statements involve known and unknown risks, 
uncertainties and other factors that  may cause our actual results, performance or achievements to be materially 
different from any future results, performance  or  achievements  expressed  or  implied  by  the  forward-looking 
statements. Such factors include, amongst others, risks  related to: 

counterparty risks associated with sales of our metals; 

foreign currency exchange rate fluctuations; 
changes in general economic conditions; 

inherent hazards associated with mining operations; 
future prices of copper and other metals; 
compliance with financial covenants; 
surety bonding; 

• 
• 
• 
• 
•  our ability to raise capital; 
•  Capstone’s ability to acquire properties for growth; 
• 
•  use of financial derivative instruments and associated counterparty risks; 
• 
• 
•  accuracy of mineral resource and mineral reserve estimates; 
•  operating in foreign jurisdictions with risk of changes to governmental regulation; 
• 
• 
• 
• 
•  aboriginal title claims and rights to consultation and accommodation; 
• 
•  uncertainties and risks related to the potential development of the Santo Domingo Project; 
• 
increased operating and capital costs; 
• 
challenges to title to our mineral properties; 
•  dependence on key management personnel; 
•  potential conflicts of interest involving our directors and officers; 

compliance with governmental regulations; 
compliance with environmental laws and regulations; 
reliance on approvals, licences and permits from governmental authorities; 
impact of climatic conditions on our Pinto Valley, Cozamin and Minto operations; 

land reclamation and mine closure obligations; 

3 

 
 
corruption and bribery; 
limitations inherent in our insurance coverage; 
labour relations; 
increasing energy prices; 
competition in the mining industry; 
risks associated with joint venture partners; 

• 
• 
• 
• 
• 
• 
•  our ability to integrate new acquisitions into our operations;  
• 
• 

cybersecurity threats and; 
legal proceedings. 

For a more detailed discussion of these factors and other risks, see “Risk Factors” beginning on page 69. 

Although  we  have  attempted  to  identify  important  factors  that  could  cause  our  actual  results,  performance 
or  achievements to differ materially from those described in our forward-looking statements, there may be other 
factors that  cause our results, performance or achievements not to be as anticipated, estimated or intended. 
There  can  be  no  assurance  that  our  forward-looking  statements  will  prove  to  be  accurate,  as  our  actual 
results,  performance  or  achievements  could  differ  materially  from  those  anticipated  in  such  statements. 
Accordingly, readers should not place  undue reliance on our forward-looking statements. 

Currency 

We report our financial results and prepare our financial statements in United States dollars. All currency amounts in 
this  Annual Information Form are expressed in United States dollars, unless otherwise indicated. References to 
“C$” are to  Canadian dollars, references to “MX$” are to Mexican pesos and references to “CLP” are to Chilean 
pesos. 

The United States dollar exchange rates for our principal operating currencies are as follows: 

Canadian dollar (C$)1
Average 

High 
Low 

Mexican peso (MX$)2
Average 

High 
Low 

As at December 31 

2016 
1.3248 

1.4589 
1.2544 

18.6845 

20.9395 
17.2005 

2015 
1.2785 

1.3990 
1.1728 
2015 
15.8671 

17.3897 
14.5235 

2014 
1.1047 

1.1533 
1.1074 
2014 
13.2985 

14.7843 
12.8429 

1 Information on US$ to C$ exchange rates obtained from Bank of Canada daily noon exchange rates. 
2 Information on US$ to MX$ exchange rates obtained from Bank of Mexico. 

Conversion Table 

In this Annual Information Form, metric units are used with respect to Capstone’s mineral properties, unless 
otherwise  indicated. Conversion rates from imperial measures to metric units and from metric units to imperial 
measures are  provided in the table set out below. 

Imperial Measure  =  Metric Unit 

2.47 acres   
3.28 feet   
0.62 miles   
0.032 ounces (troy)   
1.102 tons (short)   
0.029 ounces (troy)/ton   

1 hectare 

1 metre 

1 kilometre 

1 gram 

1 tonne 

1 gram/tonne 

Metric Unit 
0.4047 hectares   
0.3048 metres   
1.609 kilometres   
31.1 grams   
0.907 tonnes   
34.28 grams/tonne   

= 

Imperial Measure 
1 acre 

1 foot 

1 mile 

1 ounce (troy) 

1 ton 

1 ounce (troy)/ton 

4 

 
 
 
 
 
Compliance with NI 43-101 

As required by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), Capstone 
has filed technical reports detailing the technical information related to its material mineral properties discussed 
herein. For the purposes of NI 43-101, Capstone’s material mineral properties are the Pinto Valley Mine, the 
Cozamin  Mine,  the  Minto  Mine,  and  the  Santo  Domingo  Project.  Unless  otherwise  indicated,  Capstone  has 
prepared the technical information in this Annual Information Form (“Technical Information”) based on information 
contained in the technical reports, news releases and other public filings (collectively, the “Disclosure Documents”) 
available under Capstone’s profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by, or 
under the supervision of, or approved by a Qualified Person as defined in NI 43-101. For readers to fully understand 
the information in this Annual Information Form, they should read the Disclosure Documents in their entirety, 
including all qualifications, assumptions and exclusions that relate to the Technical Information set out in this 
Annual Information Form which qualifies the Technical Information. The Disclosure Documents are each intended 
to be read as a whole, and sections should not be read or relied upon out of context. Readers are advised that 
mineral resources that are not mineral reserves do not have demonstrated economic viability. The Technical 
Information is subject to the assumptions and qualifications contained in the Disclosure Documents. 

Classification of Mineral Reserves and Mineral Resources 

In this Annual Information Form and as required by NI 43-101, the definitions of proven and probable mineral 
reserves and measured, indicated and inferred mineral resources are those used by Canadian provincial securities 
regulatory authorities and conform to the definitions utilized by the Canadian Institute of Mining, Metallurgy and 
Petroleum (“CIM”) in the “CIM Standards on Mineral Resources and Reserves – Definitions and Guidelines” adopted 
on August 20, 2000, as amended (“CIM Standards”). Readers should note that the CIM standards as adopted by the 
CIM on November 27, 2010 were the relevant standards in effect at the time of the preparation of certain technical 
reports, including technical reports in respect of the Minto Mine and the Santo Domingo Project, and should refer 
to the 2010 CIM standards when reviewing those reports. 

Cautionary Note to US Investors Concerning Estimates of Mineral Reserves and Mineral Resources 

The disclosure in this Annual Information Form uses mineral resource and mineral reserve classification terms that 
comply with reporting standards in Canada, and, unless otherwise indicated, all mineral resource and mineral 
reserve estimates included in this Annual Information Form have been prepared in accordance with NI 43-101. NI 
43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public 
disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards 
differ significantly from the disclosure requirements of the SEC set forth in Industry Guide 7. Consequently, mineral 
resource and mineral reserve information contained in this Annual Information Form is not comparable to similar 
information that would generally be disclosed by US companies in accordance with the rules of the SEC. 

In particular, the SEC’s Industry Guide 7 applies different standards in order to classify mineralization as a reserve. 
As a result, the definitions of proven and probable reserves used in NI 43-101 differ from the definitions in Industry 
Guide 7. Under SEC standards, mineralization cannot be classified as a “reserve” unless the determination has been 
made that the mineralization could be economically and legally produced or extracted at the time the reserve 
determination is made. Accordingly, mineral reserve estimates contained in this Annual Information Form may not 
qualify as “reserves” under SEC standards. 

In  addition,  this  Annual  Information  Form  uses  the  terms  “measured  mineral  resources”,  “indicated  mineral 
resources” and “inferred mineral resources” to comply with the reporting standards in Canada. The SEC’s Industry 
Guide 7 does not recognize mineral resources and US companies are generally not permitted to disclose resources 
in documents they file with the SEC. Investors are cautioned not to assume that any part or all of the mineral 
deposits in these categories will ever be converted into SEC defined mineral “reserves.” Further, “inferred mineral 
resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or 
economically. Therefore, investors are also cautioned not to assume that all or any part of an inferred mineral 

5 

 
 
resource exists. In accordance with Canadian rules, estimates of “inferred mineral resources” cannot form the basis 
of feasibility or other economic studies, except in rare cases. In addition, disclosure of “contained ounces” in a 
mineral resource estimate is permitted disclosure under NI 43-101 provided that the grade or quality and the 
quantity of each category is stated; however, the SEC normally only permits issuers to report mineralization that 
does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures. 
For the above reasons, information contained in this Annual Information Form containing descriptions of our 
mineral resource  and  mineral  reserve estimates is not comparable to similar information made  public by US 
companies subject to the reporting and disclosure requirements of the SEC. 

6 

 
 
GLOSSARY OF TECHNICAL TERMS 

In this Annual Information Form, the following technical terms are defined: 

AAS 

Ag 

Alteration 

Anomaly 

Assay 

Au 

Biotite 

atomic absorption spectroscopy. 

silver. 

chemical and mineralogical changes in rock mass resulting from the passage of fluids. 

a deviation from uniformity. In the search for minerals, it is an area in which higher or lower than 
background concentrations of minerals or expected values of various survey data may be found. 

an analysis of the contents of metals in mineralized rocks. 

gold. 

a magnesium-iron mica widely distributed in igneous rocks. 

Brownfield Project 

a project located near an operating mine. 

Breccia 

Chlorite 

CIM 

a fragmental rock whose components are angular and not water-worn 

the general term for hydrated silicates of aluminum, iron and magnesium. 

Canadian Institute of Mining, Metallurgy and Petroleum and the “CIM Standards on Mineral 
Resources and Reserves – Definitions and Guidelines” adopted on August 20, 2000 and amended 
December 11, 2005, November 27, 2010 and May 10, 2014 (unless indicated otherwise in this 
Annual Information Form). 

Cu 

copper. 

diamond drillholes 

holes drilled by a method whereby rock is drilled with a diamond impregnated, hollow drilling bit 
which produces a continuous, in situ record of the rock mass intersected in the form of solid 
cylinders of rock which are referred to as core. 

disseminated 

a texture in which minerals occur as scattered particles in the rock. 

Dmt 

Dmtu 

DFS 

Dyke 

Fabric 

Fault 

Fe 

Feldspar 

Foliation 

G 

Grade 

dry metric tonnes. 

dry metric tonne unit. 

definitive feasibility study. 

an intrusive tabular body of igneous rock that cuts across the layering or fabric of the host rock. 

the spatial arrangement and orientation of rock components, whether crystals or sedimentary 
particles, as determined by their sizes, shapes, etc. 

a fracture in a rock across which there has been displacement. 

iron. 

one of a group of rock forming minerals which include microcline, orthoclase, plagioclase and 
anorthoclase. 

the preferred planar orientation of minerals and mineral aggregates in metamorphic rocks. 

gram. 

the amount of valuable mineral in each tonne of ore, expressed as ounces per ton or grams per 
tonne for precious metal and as a percentage by weight for other metals. 

Greenfield Project 

a project not located near an operating mine. 

g/t 

Ha 

host rock 

HQ 

grams per metric tonne. 

hectares. 

a volume of rock within which mineralization or an ore body occurs. 

approximately 63mm diameter drill core. 

7 

 
GLOSSARY OF TECHNICAL TERMS 

hydrothermal 

applied to metamorphic and magmatic emanations high in water content; the processes in which 
they are concerned; and the rocks or ore deposits, alteration products, and springs produces by 
them. 

Igneous 

Indicated  
Mineral  
Resource 

Inferred  
Mineral  
Resources 

IOCG 

K 

Koz 

Kt 

LOM 

M 

Mafic 

Masl 

Measured  
Mineral  
Resource 

Mineral Reserve 

a type of rock that is crystallized from a liquid magma. 

in accordance with CIM Definition Standards, is that part of a Mineral Resource for which quantity, 
grade or quality, densities, shape and physical characteristics are estimated with sufficient 
confidence to allow the application of Modifying Factors (as defined below) in sufficient detail to 
support mine planning and evaluation of the economic viability of the deposit. Geological evidence 
is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient 
to assume geological and grade or quality continuity between points of observation. An Indicated 
Mineral Resource has a lower level of confidence than that applying to a Measured Mineral 
Resource and may only be converted to a Probable Mineral Reserve. 

in accordance with CIM Definition Standards, that part of a Mineral Resource for which quantity 
and grade or quality are estimated on the basis of limited geological evidence and sampling. 
Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. 
An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated 
Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that 
the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with 
continued exploration. 

iron oxide-copper-gold; a recognized mineral deposit type. 

kilo (thousand). 

thousands of ounces. 

one thousand tonnes. 

life of mine 

mega (million). 

ferromagnesian minerals and rocks where these minerals are abundant 

metres above sea level. 

in accordance with CIM Definition Standards, is that part of a Mineral Resource for which quantity, 
grade or quality, densities, shape, and physical characteristics are estimated with confidence 
sufficient to allow the application of Modifying Factors to support detailed mine planning and final 
evaluation of the economic viability of the deposit. Geological evidence is derived from detailed 
and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or 
quality continuity between points of observation. A Measured Mineral Resource has a higher level 
of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral 
Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve. 

in accordance with CIM Definition Standards, economically mineable part of a Measured and/or 
Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may 
occur when the material is mined or extracted and is defined by studies at pre-feasibility or 
feasibility level as appropriate that include application of Modifying Factors. Such studies 
demonstrate that, at the time of reporting, extraction could reasonably be justified. The reference 
point at which Mineral Reserves are defined, usually the point where the ore is delivered to the 
processing plant, must be stated. It is important that, in all situations where the reference point is 
different, such as for a saleable product, a clarifying statement is included to ensure that the 
reader is fully informed as to what is being reported. The public disclosure of a Mineral Reserve 
must be demonstrated by a pre-feasibility study or feasibility study. 

8 

 
 
 
 
GLOSSARY OF TECHNICAL TERMS 

Mineral Resource 

in accordance with CIM Definition Standards, is a concentration or occurrence of solid material of 
economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there 
are reasonable prospects for eventual economic extraction. The location, quantity, grade or 
quality, continuity and other geological characteristics of a Mineral Resource are known, estimated 
or interpreted from specific geological evidence and knowledge, including sampling. Mineral 
Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated 
and Measured categories. 

Mineralization 

significant amounts of mineral(s) that is (are) of economic interest which may be established by 
prospecting, trenching and drilling. 

Mlb 

Mo 

Modifying Factors 

millions of pounds. 

molybdenum. 

Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. 
These include, but are not restricted to, mining, processing, metallurgical, infrastructure, 
economic, marketing, legal, environmental, social and governmental factors. 

MS 

Mt 

MW 

magnetic susceptibility. 

megatonne (million tonnes). 

megawatt (million watts). 

NI 43-101 

National Instrument 43-101 – Standards of Disclosure for Mineral Projects. 

NQ 

NSR 

Ore 

Outcrop 

Pb 

Pyrite 

QAQC 

approximately 47 millimetre diameter diamond drill core. 

net smelter return. 

rock that contains one or more minerals or metals, at least one of which has commercial value and 
which is estimated to be able to be recovered at a profit. 

an exposure of bedrock at the earth’s surface. 

lead. 

a common iron sulphide mineral commonly found in hydrothermal veins and systems and 
commonly associated with gold mineralization. 

quality assurance/quality control in a mineral exploration and mining context is the combination of 
quality assurance, the process or set of processes used to assure data quality, and quality control, 
the process of identifying data outside of established tolerance limits. 

Qualified Person 

has the meaning set out in NI 43-101. 

Quartz 

SAG 

Silica 

Tpd 

Vein 

a common rock forming mineral made up of silicon dioxide. 

Semi-Autogenous grinding. 

silicon dioxide (SiO2), which occurs in the crystalline forms as quartz, cristobalite, tridymite, as 
cryptocrystalline chalcedony, as amorphous opal, and as an essential constituent of the silicate 
groups of minerals. 

tonnes per day. 

a sheet-like body of minerals formed by fracture-filling or replacement of the host rock. 

Volcanic 

formed by volcanic activity. 

WUL 

Zn 

water use licence. 

zinc. 

9 

 
 
 
1 – CORPORATE STRUCTURE 

1.1 

Name, Address and Incorporation 

Capstone was incorporated pursuant to the Company Act (British Columbia) on July 17, 1987 under the name 
330338 BC Ltd. We changed our name to Fire Star Resources Ltd. on April 21, 1989, to International Bancorp Ltd. on 
August 17, 1989, and to IBL Equities Ltd. on March 5, 1991. On January 2, 1996, we changed our name to Serena 
Resources Ltd. and consolidated our share capital on a 5:1 basis. On May 17, 2001, we changed our name to 
Consolidated Serena Resources Ltd. and consolidated our share capital on a 5:1 basis. We changed our name to 
Capstone Gold Corp. on March 6, 2003. On January 12, 2005, we amended our Notice of Articles to, amongst other 
things, change our authorized capital from 100,000,000 common shares to an unlimited number of common 
shares, and to reduce the threshold percentage of votes required to approve a special resolution from 75% to 
66⅔%. We changed our name to our current name, Capstone Mining Corp. on February 8, 2006. On November 24, 
2008, Capstone and Sherwood Copper Corporation (“Sherwood”) completed a court-approved plan of arrangement 
pursuant to which a Capstone wholly-owned subsidiary acquired all of the issued and outstanding common shares 
of Sherwood in exchange for common shares of Capstone, and that subsidiary and Sherwood amalgamated to form 
a new corporation named “Capstone Mining North Ltd.” On January 1, 2009, Capstone and Capstone Mining North 
Ltd. were amalgamated to form Capstone Mining Corp. On April 30, 2014, we amended our Articles to modify the 
means  by  which  notice  of  meetings  of  shareholders  and  other  shareholder  information  may  be  delivered  to 
shareholders and increased the quorum requirements for meetings of shareholders to two persons holding at least 
25% of the votes eligible to be cast at the meeting. Capstone is now governed by the Business Corporations Act 
(British Columbia). 

Capstone’s corporate head office and registered office is located at 2100 – 510 West Georgia Street, Vancouver, BC, 
V6B 0M3. 

1.2 

Intercorporate Relationships 

The following chart describes the intercorporate relationships amongst Capstone’s subsidiaries and the percentage 
of voting securities held by Capstone, either directly or indirectly, as at December 31, 2016, and the jurisdiction of 
incorporation, formation, continuation or organization of each subsidiary: 

10 

 
 
2 – GENERAL DEVELOPMENT OF THE BUSINESS 

2.1 

Three Year History 

2017 to date 

On January 13, 2017, a payment of $20.0 million was made on Capstone’s Senior Secured Corporate Revolving 
Credit Facility ("RCF"), reducing the outstanding balance to $308.9 million. This payment was in addition to the 
$20.0 million payment and permanent credit reduction made in Q4 2016. At the same time, Capstone chose to 
permanently reduce the credit available under the RCF from $420 million to $400 million. 

2016  

In January, the Pinto Valley Mine published the PV3 Pre-Feasibility Study (“PV3 PFS”) extending the mine life by 13 
years  to  2039,  with  plans  to  increase  throughput  by  8%  without  major  capital  investment.  Increased  mill 
efficiencies resulted in new daily, monthly and quarterly throughput records throughout the year.  

The Cozamin Mine underwent a reorganization in 2016 with efforts focused on adopting a number of additional 
process improvements and training resources aimed at advancing mine development. Mineral resources and 
reserves at Cozamin were updated to take into account exploration and infill drilling completed during 2016. 
Exploration drilling resulted in new Indicated Mineral Resources that replenished 2016 mine production, however 
there was a net reduction of Measured and Indicated Mineral Resources totaling 2,487 kt averaging 1.18% Cu. This 
was due to changes in the Indicated classification boundary and further removal of Measured Mineral Resources 
contained in pillar material deemed to be not potentially economically extractable. The updated mineral reserves 
for the San Roberto and Mala Noche Footwall zones (“MNFWZ”) were reduced by 2,059 kt (including 2016 mine 
production), which accounts for a 29% decrease in tonnage and 18% contained copper versus the year-end 2015 
reserves. This represents a less than 15% reduction to Cozamin’s NPV, as the reduction was related to low-grade 
material in the MNFWZ and material in San Roberto that was scheduled in the last year of the mine plan. In 
addition, the San Rafael zone resource, previously modelled in 2009, was updated in anticipation of an investigation 
into the viability of blending zinc-rich San Rafael ore with material mined from San Roberto and the MNFWZ. 

After starting out the year with plans to temporarily suspend underground operations at Minto, successful efforts 
to lower costs extended underground mining into July 2017. After completing mining at Minto North in September, 
another stage of surface mining in the Area 2 pit was approved to extend surface operations and milling through 
2017. During the year an engineering change occurred whereby the Area 2 Underground mineral reserves were 
updated  taking  into  account  changes  to  the  block  model.    With  recent  copper  price  improvements,  work  is 
underway to extend operations beyond the completion of the Area 2 underground and open pit. 

In addition to a reduction of our permanent workforce by 10% and full-time contractors by 5% in 2015, Capstone 
announced  several  new  cost  reduction  activities  in  January  2016,  including  decreasing  corporate  head office 
positions by 22% and reducing recurring general and administrative expenses by nearly 20% (not including a non-
recurring amount of $3.6 million related to workforce reductions).  

The San Manuel Arizona Railroad Company (“SMARRCO”) was placed on care and maintenance, resulting in a move 
to a modular truck transport system to haul concentrate from the Pinto Valley Mine to domestic customers and to 
the port of Guaymas, Mexico for export. 

With a focus on covenant compliance and debt repayment, Capstone fixed prices on sales of copper concentrate 
open to quotational period adjustments as at the end December 2015 as well as on sales of copper concentrate 
shipped during the first quarter of 2016 in addition to hedging second quarter sales. Strong operating performance 
and cost control, combined with certainty around copper revenue, ensured covenant compliance throughout the 
year and provided the ability to repay $20 million on the RCF early in the fourth quarter. In November, a price 
protection program was set up to further protect sale prices of copper, predominantly over the first half of 2017 to 
assure continued debt repayment. 

11 

 
On October 25, 2016, we announced the appointment of Robert Gallagher and Jill Gardiner to Capstone’s board of 
directors, and the retirement of Chantal Gosselin as a director. 

Exploration activities undertaken in 2016 included brownfield exploration at the Cozamin Mine in Mexico and 
greenfield exploration,  primarily  in  Chile  focused  at advancing the Project Providencia,  a Sociedad Química y 
Minera Chile S.A. (“SQM”) project in which we have an option to earn into. Activities at Providencia included 
mapping, soil geochemistry, trenching, geophysics and drilling. 

2015 

Pinto Valley continued to focus on reliability enhancement related to mill stability at the targeted throughput level 
of 52,000 tpd, steadily improving throughout the year to set daily, monthly and quarterly average throughput 
records  under  Capstone  ownership  in  Q4.  Work  continued  throughout  the  year  to  implement  the  PV2  Pre-
Feasibility Study (“PV2 PFS”) expansion plan at the Pinto Valley Mine, which extended the mine life to 2026. Work 
also continued throughout the year to scope various expansion options for the PV3 PFS. A detailed evaluation to 
expand mill throughput to 90,000 tpd was not advanced as the Company concluded this would not generate 
sufficient returns to justify the development and capital risk 

At the Cozamin Mine, the mineral resources and reserves at the MNFWZ were updated to take into account 
exploration  and  infill  drilling  completed  during  2014  and  2015  in  this  zone.  The  mineral  reserves  update 
replenished the material mined during 2015 and further extended mine life by approximately three months, at an 
average grade well above the average reserve grade. 

At the Minto Mine, the Yukon Water Board issued the Water Use Licence on August 5, 2015, which completed the 
final stage of permitting for all of the mineral reserves identified in the July 2012 Phase VI Pre-Feasibility Study. 
Stripping of the Minto North deposit began immediately, with first ore release in December 2015. 

In January 2015 we announced a RCF for up to $500 million. This facility amended our existing senior secured 
corporate revolving term facility and allowed us to repay and cancel our senior secured reducing revolving credit 
facility. The RCF was established with a four year term and requires certain interest coverage and leverage ratios. 

In February 2015 we selected POSCO E&C (“POSCO”) as the preferred Engineering, Procurement, Construction 
(“EPC”)  fixed  price  lump  sum  contractor  for  the  Santo  Domingo  Project.  On  July  7,  2015,  Capstone  received 
approval for the Environmental Impact Assessment (“EIA”), covering the entire project as outlined in the 2014 
Feasibility Study. Using a disciplined stage-gate approach for advancing the project, we determined that, as a result 
of the negative outlook for iron prices in July, 2015 that we should assess a phased approach, focusing on preparing 
a Feasibility Study to advance the copper portion of the project first, with the option to add iron facilities should the 
outlook for that market improve. As copper prices continued to deteriorate over the summer, we announced the 
suspension  of  most  work  on  the  Santo  Domingo  project  in  September  2015  and  significantly  downsized  the 
Santiago and Diego de Almagro offices in Chile. The project and completion of the Feasibility Study for the phased 
approach is on hold with optionality maintained for future development when conditions improve. 

In May 2015 Capstone entered into zero-cost collars for 36,000 tonnes of copper production between then and 
September  30,  2015  (with  pricing  periods  from  June  2015  to  February  2016)  at  a  minimum  of  $2.60  and  a 
maximum  of  $3.10  per  pound  of  copper.  This  price  protection  allowed  us  to  fully  commit  our  2015  capital 
expenditure budget, while retaining some benefit should the price for copper increase through this period. 

Exploration activities undertaken in 2015 included brownfield exploration at the Cozamin Mine in Mexico and 
greenfield exploration, primarily in Chile at Project Providencia, a SQM project in which we have an option to earn 
into. A drilling and trenching program at Providencia focused on soil geochemistry and led to the discovery of two 
copper-gold prospects that Capstone is still actively exploring. 

12 

 
2014 

Following the acquisition of the Pinto Valley Mine in 2013, we issued the PV2 PFS in March of 2014 converting 
Mineral Resources to Mineral Reserves to take the mine plan from 5 years to 12 years, extending the mine life to 
2026. Immediately following that, a further study was undertaken to consider the remaining Mineral Resources and 
their potential. At year end Capstone announced that two cases would be advanced to the PV3 PFS level. The base 
case included a 10% to 15% increase in throughput and the possibility of a mine life extension beyond 2026 and a 
second case would evaluate a throughput increase to 90,000 tpd combined with a potential mine life extension. 

In August 2014, we announced completion of an updated NI 43-101 compliant mineral resource estimate for the 
Cozamin Mine. The estimate resulted in an immaterial reduction of both Mineral Reserves and Mineral Resources 
and a number of steps were initiated to recover some reserve losses. 

At the Minto Mine, the mine plan was revised during the year to reflect the delay in receiving the Water Use 
Licence (“WUL”) amendment which was required to bring additional reserves into the mine plan. Capstone made 
application to the Yukon Environmental Socio-Economic Assessment Board ("YESAB") for all remaining identified 
copper reserves on the property in July 2013 and YESAB recommended in favour of the proposed continuation of 
operation of the Mine in April 2014. Application was then made for the amended Quartz Mining and Water Use 
Licences on July 2, 2014. We had three rounds of information requests from the Yukon Water Board through the 
latter part of 2014, with the Yukon Water Board declaring “Adequacy” in December 2014. On December 10, 2014, 
our application went to the public comment period, which ended on January 21, 2015, with the WUL issued on 
August 5, 2015. 

Development activities advanced in 2014 at our Santo Domingo Project. In June 2014 we completed a feasibility 
study for the project with capital costs within the range of $1.7 billion as previously guided (accuracy range of -10% 
to +15%) and an unlevered after-tax internal rate of return of 17.9%. Throughout the year we continued to advance 
the regulatory, social licence and technical development of the project. 

A number of exploration activities were undertaken in 2014, both brownfield at our Cozamin Mine in Mexico and 
greenfield,  primarily  in  Chile  at  Project  Providencia,  the  earn  in  project  with  SQM.  A  drilling  program  tested 
coincident anomalies of induced polarization chargeability and multi-element soil geochemistry leading to the 
discovery of a copper- gold porphyry-type prospect. 

3 – DESCRIPTION OF THE BUSINESS 

3.1 

General 

Capstone  is  a  Canadian  base  metals  mining  company,  focused  on  copper  in  politically  safe,  mining  friendly 
jurisdictions in the Americas. We have grown through a combination of exploration, development and acquisition 
of mineral properties and currently operate three producing copper mines: Pinto Valley in the US, Cozamin in 
Mexico and Minto in Canada. We have two development projects: Santo Domingo in Chile and Kutcho in Canada, as 
well as exploration properties in Chile and US. 

Our principal product is copper, with zinc, lead, molybdenum, silver and gold produced and sold as by-products. We 
are focused on profitability, a growing production profile and operating in a safe and responsible manner. Our 
operating and growth strategy has two tiers. The first is to maintain our financial and operating flexibility through 
all points of the commodity cycle. The second is to pursue the organic growth potential of our existing development 
projects and extension of our existing mines. Capstone’s material mineral properties consist of: 

•  Pinto Valley Mine, an open-pit, copper mine located in Arizona, US; 
•  Cozamin Mine, an underground, polymetallic mine located in the State of Zacatecas, Mexico;  
•  Minto  Mine,  an  open-pit  and  underground  copper  mine  located  in  the  Whitehorse  Mining  District, 

Yukon,  Canada; and 

•  Santo Domingo Project, a large scale, copper-iron project in Chile, in which Capstone holds a 70% interest. 

13 

 
In addition to ongoing exploration at the Cozamin Mine aimed at increasing mine life and throughput, we have a 
portfolio of early-stage, base metals exploration projects with the potential to add to production over the longer 
term. This exploration is focused in mining friendly jurisdictions, with preference given to areas where a team is in 
place  and  the  permitting  process  is  well  understood.  Capstone  is  actively  pursuing  additional  exploration 
opportunities through earn-in and joint venture models. 

The primary exploration project we are presently advancing is Project Providencia in Region II, Chile, under an 
option agreement with SQM to earn up to 70% of the project. It is a very large under-explored land package in the 
world’s most prolific copper jurisdiction. 

14 

 
Principal Products and Operations 

Capstone’s principal product is copper (in concentrate as well as copper cathode), with zinc, lead, molybdenum, silver 
and gold produced as by-product. The following table summarizes Capstone’s production for 2015 and 2016: 

Operating  Statistics 

Production (contained metal and cathode) 1 

Pinto Valley 

Cozamin 

Minto 

2016 

2015 

2016 

2015 

2016 

2015 

Copper (tonnes) 
Zinc (tonnes) 
Lead (tonnes) 
Molybdenum  (tonnes) 
Silver (000s ounces) 2
Gold (ounces) 3

Mining - Open Pit 

Waste (000s tonnes) 
Ore (000s tonnes) 
Total (000s tonnes) 

Mining – Underground 
Ore (000s tonnes) 

Milling 

Milled (000s tonnes) 
Tonnes per day 
Copper grade (%) 
Zinc grade (%) 
Lead grade (%) 
Molybdenum grade (%) 
Silver grade (g/t) 2
Gold grade (g/t) 3

Recoveries 

Copper (%) 
Zinc (%) 
Lead (%) 
Silver (%) 
Gold (%) 1

Concentrate   Production 

Copper (dmt) 
Copper (%) 
Silver (g/t) 2
Gold (g/t) 3

Zinc (dmt) 

Zinc (%) 
Lead (dmt) 

Lead (%) 
Silver (g/t) 
Molybdenum (dmt) 

68,850 

83 
377 
1,944 

19,507 
23,435 
42,942 

20,565 
56,189 
0.37 

0.01 

87.6 

234,702 
28.5 

174 

14,307 
4,193 
130 

1,001 

60,412 
- 
- 
89 
290 
1,002 

11,464 
23,139 
34,603 

15,650 
5,860 
684 
- 
1,287 
- 

- 
- 
- 

31,426 

355 
39,506 

5,585 
1,506 
7,091 

16,515 
- 
- 
- 
170 
16,114 

5,044 
383 
5,428 

- 

996 

1,079 

246 

457 

1,491 
4,074 
2.21 

8.0 
1.23 

95.2 

87.8 
67.0 

70,348 
44.7 
157 
17.5 

17,730 
48,576 
0.38 
- 
- 
0.01 
- 
- 

87.4 
- 
- 
- 
- 

203,966 
28.6 
- 
- 
- 
- 
- 
- 
- 
184 

1,001 
2,736 
1.51 
0.66 
0.07 

43.0 

94.8 
63.0 
18.7 
72.4 

53,744 
26.6 
566 

8,866 

47.3 
222 
58.4 
3,155 

1,080 
2,958 
1.56 
0.84 
0.14 
- 
53.0 
- 

93.0 
64.6 
44.2 
69.6 

60,826 
25.7 
598 
- 
12,453 
47.1 
1,166 
58.6 
3,112 
- 

1,388 
3,803 
1.38 
- 
- 
- 
4.7 
0.49 

86.2 
- 
- 
76.9 
73.6 

45,703 
36.1 
116 
11.0 
- 
- 
- 
- 
- 
- 

1 Adjustments based on final settlements will be made in future quarters. 
2 Pinto Valley silver is not assayed on site, resulting in a significant lag time in receiving this data. As such, this figure is an estimate.  
3 Pinto Valley gold production reaches payable levels from time to time. Any payable gold production will be reported in the period revenue is 
received. Gold is not assayed on site, resulting in a significant lag time in receiving this data. As such, this figure is an estimate. At Minto, this 
amount represents gold contained in copper concentrate and excludes gold contained in gold concentrate produced.  

During  the year  ended December 31,  2016, we  generated  gross  revenue  of  $597.2M primarily  from  the sale 
of  110,450 tonnes of payable copper.

15 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The following table summarizes the gross sales revenue for 2016 and 2015: 

Gross Revenue by Metal 

20161 

20151 

$ millions 
551.9 
7.1 
0.2 
1.2 
14.3 
22.5 
597.2 

Copper 
Zinc 
Lead 
Molybdenum 
Silver2 
Gold2 
Total3 
1 The current and subsequent periods may include final settlement quantity and/or price adjustments from prior shipments. 
2 Gold and silver revenues include non-cash amounts for deferred revenue amortization related to the precious metal stream sales. 
3 Treatment and selling costs of $67.8 million (2015 - $65.7 million) are deducted from gross revenue of $597.2 million (2015 – $486.2  
 million) for revenue of $529.4 million (2015 - $420.5 million) as per the Consolidated Statements of Loss. 

$ millions 
453.3 
9.3 
1.4 
1.2 
13.3 
7.7 
486.2 

% 
92.4 
1.2 
0.0 
0.2 
2.4 
3.8 
100 

% 
93.2 
1.9 
0.3 
0.2 
2.7 
1.6 
100 

Pinto Valley production is primarily copper concentrate with a small amount of copper cathode produced from run-
of-mine leaching and SX/EW production and molybdenum as a by-product. Historically the mine has also recovered 
silver as a by-product, though it is not estimated in the block model and is not included in the Mineral Resource or 
Reserve estimate. In 2016, approximately 25% of the copper concentrate production was delivered to domestic 
smelting facilities with the balance being exported to Asia. The copper cathode is sold domestically through a 
competitive tendering process. In early 2016, SMARRCO was placed on temporary care and maintenance, resulting 
in the temporary cessation of all rail operations as part of the transportation chain that delivers concentrate to the 
Port of Guaymas, Mexico for export. A modular truck transport system is now used to haul the concentrate from 
the  Pinto  Valley  Mine  to  domestic  customers  and  to  the  port  of  Guaymas  for  export.  Pinto  Valley  averaged 
throughput of 56,000 tpd in 2016, prompting plans to increase throughput in 2017 beyond the target of 56,000 tpd 
contemplated in the PV3 pre-feasibility study. Life of mine annual production is 55,700 t of contained copper and 
86 t of molybdenum. 

Cozamin concentrate production is primarily copper with lesser amounts of by-product zinc and lead concentrate 
and contained silver. The copper concentrate is delivered to a major trading company in Manzanillo, Mexico under 
a multi- year agreement. Similarly, zinc and lead concentrate are sold under annual tenders and delivered to 
Manzanillo,  as  and  when  produced.  Cozamin  averaged  throughput  of 2,700  tpd  in  2016,  and  is  expecting  to 
produce 14,000 t copper contained in concentrate containing silver, zinc and lead by-products in 2017. 

The Minto Mine produces a high-grade copper concentrate. Sale of the concentrate is by open annual tender. 
Typically, trading companies provide the best terms of sale on a CIF North Asia basis. Due to its location and 
climate, logistics for the movement of concentrate are seasonal. Shipments by truck from the mine to the port of 
Skagway, Alaska are typically undertaken between January and March and then between July and October. In the 
intervening  periods,  concentrate  production  is  stored  in  a  protective  environment  at  site.  Minto  Mine  has  a 
processing rate of 3,850 tpd and is expected to produce 19,000 kt copper contained in concentrate containing silver 
and gold by-products in 2017. The operation is currently slated to be temporarily placed on care and maintenance 
at the end of 2017. Capstone management is continuing to review the economics of additional mining which could 
extend operations. Depending upon the outlook for copper prices in the second-half of 2017, the option may exist 
to extend production from Minto into 2018 and beyond.  

Precious Metals Streams 

In 2008, we sold all of our gold and silver production from the Minto Mine over the life of mine to Silverstone 
Resources (“Silverstone”) in consideration for an upfront payment of $37.5M and a further payment of the lesser of 

16 

 
 
 
$300 per ounce of gold and $3.90 per ounce of silver (subject to a 1% inflationary adjustment after three years and 
each year thereafter) and the prevailing market price for each ounce delivered. Silverstone was subsequently 
bought by Silver Wheaton Corp. (“Silver Wheaton”). If production from the Minto Mine exceeds 30,000 ounces of 
gold per year, Silver Wheaton will be entitled to purchase only 50% of the amount in excess of that threshold. We 
have recorded the proceeds received as deferred revenue and recognize this amount as an adjustment to revenue 
as the ounces are delivered. 

Under an April 2007 agreement we have committed to sell the Cozamin Mine’s silver production over a 10-year 
period to a company subsequently acquired by Silver Wheaton. Under that agreement, Silver Wheaton pays for 
each ounce of refined silver from the mine the lesser of $4.00 per ounce of silver (subject to a 1% inflationary 
adjustment after three years and each year thereafter) and the prevailing market price for each ounce of silver, 
subject  to  price  adjustments.  Further,  we  agreed  to  deliver  a  minimum  of  10.0M  ounces of  silver  under the 
Agreement. To December 31, 2016 a total of 12.2M ounces have been delivered against the contract, exceeding 
the minimum delivery requirement. This stream expires on April 4, 2017 after which the full value of the silver 
produced at Cozamin will accrue to the benefit of Capstone. 

Competitive Conditions 

Our business is to produce and  sell copper. Prices are determined by world markets over which we have no 
influence or control. Our competitive position is primarily determined by our costs compared to other producers 
throughout the world and our ability to maintain our financial integrity through metal price cycles. Costs are 
governed to a large extent by the grade, nature and location of our mineral reserves as well as by input costs and 
operating and management skills. In contrast with diversified mining companies, we focus on copper production, 
development and exploration, and are therefore subject to unique competitive advantages and disadvantages 
related to the price of copper and to a lesser extent, the price of our metal by-products. If copper prices increase, 
we will be in a relatively stronger competitive position than diversified mining companies that produce, develop 
and  explore  for  other  minerals  in  addition  to  copper.  Conversely,  if  copper  prices  decrease,  we  will  be  at  a 
competitive disadvantage to diversified mining companies. 

The mining industry is competitive, particularly in the acquisition of additional mineral reserves and resources in all 
phases of operation, and we compete with many companies possessing similar or greater financial and technical 
resources. 

Metal Prices 

The Company’s financial flexibility is highly dependent on the prevailing prices for the commodities it produces. 
While the Company’s strategy is to remain unhedged, circumstances may arise where increased certainty of cash 
flows is considered more important to long term value creation than providing investors short term exposure to the 
volatility  of  metal  prices.  In  these  circumstances,  the  Company  may  elect  to  fix  prices  within  a  contractual 
quotational period or to lock in future prices through the variety of financial derivative instruments available. 

Changes to Contracts 

Our contract with Silver Wheaton concerning Cozamin Mine’s silver production expires on April 4, 2017. Thereafter, 
the full value of the silver produced at the Cozamin Mine will accrue to the benefit of Capstone. 

A portion of our Pinto Valley Mine employees are members of six unions and are governed by one collective 
agreement. The collective agreement expired in June 2014 and negotiations have been ongoing since that time. 

Environmental Protection 

Capstone’s operations (Pinto Valley, Cozamin and Minto) and development project (Santo Domingo) are subject to 
the national and local laws and regulation in respect of the construction, operating standards and the eventual 
abandonment and restoration costs applicable to each location. Since the Cozamin Mine and certain areas of the 

17 

 
Minto Mine are relatively small tonnage, high-grade operations, the overall financial impact of the environmental 
protection requirements is minor relative to our overall financial performance. Each operation is subject to an asset 
retirement obligation review at year-end to assess the abandonment and restoration cost for the operation at that 
point. Any changes from the previous period are reflected in the balance sheet and could flow through the earnings 
statement.  While  the  financial  obligations  will  increase  as  disturbance  increases,  given  the  relatively  modest 
amounts involved, such impacts are likely to be relatively minor from a capital and earnings perspective in the near 
term. Pinto Valley Mine has a long history of operations in an established mining district of Arizona. As such, there 
are significant reclamation liabilities. These were reviewed with regulators in 2013 at the time of the acquisition by 
Capstone and were also the subject of a detailed third party assessment commissioned by the Company in 2015 
and have been updated to reflect the current mine life. 

Capstone received approval of the Environmental Impact Assessment for the Santo Domingo project in 2015, which 
includes approval for the mine, related infrastructure, copper and iron processing facilities, the development of a 
greenfield port and iron concentrate and seawater supply pipelines. 

In May 2016, Pinto Valley submitted a formal Mine Plan of Operations in support of the PV3 mine plan to the US 
Forest Service, marking the first step of the permitting process, required under the National Environmental Policy 
Act (“NEPA”). The NEPA process was initiated in January 2017.  

Our assets are in mature and stable mining jurisdictions. The environmental protection requirements are not 
expected to be a significant impediment to carrying on our business, nor should they result in an unsustainable 
burden on our earnings. 

Employees 

As of December 31, 2016, Capstone had 1,174 employees and 545 contractors. 

Our workforce at Minto and Cozamin is not unionized. There are approximately 393 hourly employees at the Pinto 
Valley Mine a portion of whom are members of six unions, and whom are all governed by one collective bargaining 
agreement negotiated by the United Steelworkers Union. The collective bargaining agreement at the Pinto Valley 
mine expired in June 2014 and negotiations have been ongoing since that time. 

Foreign Operations 

Two of Capstone’s material properties are located in foreign jurisdictions, being the Pinto Valley Mine (US), and the 
Cozamin Mine (Mexico). We also have interests in exploration projects in Chile and the US. 

Foreign operations accounted for approximately 71% of our 2016 revenue and represented approximately 87% of 
our assets as at December 31, 2016. 

Reorganization 

In 2015, Capstone restructured its Mexican group of companies to enhance Capstone’s ability to operate effectively 
and  efficiently  in  Mexico.  The  restructuring  formed  new  labour  service  companies,  namely,  San  Roberto  HR 
Company,  S.A.  de  C.V.,  Geoexploraciones  La  Bufa,  S.A.  de  C.V.  and  Servicios  de  Vigilancia  San  Roberto,  and 
transferred a 99% interest in two existing service companies (Capstone Mining S.A. de C.V. and Capstone Services 
S.A. de C.V.) from Capstone Gold S.A. de C.V. to San Roberto HR Company, S.A. Capstone Mexico Mining Corp. 
maintains its 1% interest in the two existing services companies and has a nominal interest in the new service 
companies.  

Social and Environmental Policies 

Capstone places great emphasis on providing a safe and secure working environment for all of our employees and 
contractors, and we recognize the importance of operating in a sustainable manner. 

18 

 
There was a fatality at the Cozamin mine in October 2016. A miner was struck by a piece of mobile equipment while 
working  underground.  As  part  of  company-wide  safety  program  and  response  to  this  incident,  we  shared 
investigation results with our other mine sites and enhanced how we measure health and safety performance by 
adding additional leading indicators to our monitoring programs. 

Our Values and Ethics – Code of Conduct (“Code of Conduct”) is our company policy that sets out the standards 
which guide the conduct of our business and the behaviour of our employees, officers and our Board of Directors. 
The Code of Conduct is reviewed annually by the Board. All employees, officers and directors are required to 
annually certify their understanding of and adherence to the Code of Conduct. Our Code of Conduct, amongst other 
things, sets out standards in areas relating to: 

•  Promotion and provision of a work environment in which individuals are treated with respect, provided 

with  equal opportunity and is free of all forms of discrimination; 

•  Zero tolerance policy relating to use of prohibited substances; 
•  Ethical business conduct and legal compliance, including without limitation prohibition against accepting 

or  offering bribes; 

•  Commitment to health and safety in our business operations, and the identification, elimination or control 

of  workplace hazards; 

•  Commitment to maintain and improve sound environmental practices in all of our activities. 

Capstone’s commitment to sustainable performance is defined in our Integrated Environment, Health, Safety and 
Sustainability  (“EHS&S”)  Policy.  The  Technical,  Environment,  Health,  Safety  and  Sustainability  (“TEHS&S”) 
Committee  of  the  Board  has  oversight  of  the  EHS&S  Policy.  Annual  corporate  objectives  for  sustainable 
performance and improvement are approved by the Board and are linked to the objectives and compensation for 
employees at all levels of the organization. We measure our performance against these objectives. The Chief 
Operating Officer is accountable for ensuring our operations comply with sustainability requirements. 

Capstone  publishes  an  annual  sustainability  report,  based  on  version  G4  of  the  Global  Reporting  Initiative 
Guidelines, to communicate performance in health and safety, environmental, and social aspects that are most 
material to the business and Capstone’s stakeholders. Capstone is implementing internal standards based on 
industry  best  practice  to  ensure  continual  improvement  in  key  areas  including  health  and  safety,  tailings 
management, energy management and stakeholder engagement. 

3.2 

Material Mineral Properties 

Pinto Valley Mine (US) 

Capstone, through Pinto Valley Mining Corp., owns 100% of the Pinto Valley Mine, located in the Globe-Miami 
district in Gila County, Arizona, approximately 130 km east of Phoenix in the southern United States. Pinto Valley’s 
primary product is copper concentrate and we also produce copper cathode and by-product molybdenum and 
silver. 

The Pinto Valley Mine is the subject of a report titled “Pinto Valley Mine Life Extension – Phase 3 (PV3) Pre-
Feasibility Study” dated February 23, 2016 with an effective date of January 1, 2016. This technical report was 
compiled by Capstone Mining Corp, and authored by Gregg Bush, P.Eng., Capstone Mining Corp.; Tony J. Freiman, 
PE, Amec Foster Wheeler Environment & Infrastructure, Inc.; Corolla Hoag, CPG, SME-RM, SRK Consulting (U.S.), 
Inc.; Garth Kirkham, P.Geo., Kirkham Geosystems Ltd.; Kenneth W. Major, P.Eng., KWM Consulting Inc.; and John 
Marek, PE, SME-RM, Independent Mining Consultants, Inc., each a Qualified Person as defined by NI 43-101. The 
description of the Pinto Valley Mine in this document is based on assumptions, qualifications and procedures which 
are set out in the PV3 PFS. Reference should be made to the full text of this report, which is available in its entirety 
on SEDAR at www.sedar.com under Capstone’s profile. 

19 

 
Project Description and Location 

The property is located at the west end of the Globe-Miami mining district, approximately 130 km east of Phoenix 
and 10 km west of the town of Miami, in Gila County, Arizona, at 33°23’32”N and 100°58’15”W. The Pinto Valley 
property consists of approximately 5,130 ha of contiguous claims. These comprise 69 patented lode mining claims, 
53 patented mill sites, 451 unpatented lode mining claims and mill sites, and seven parcels of fee (private) land. 

Capstone acquired the Pinto Valley Mine and associated railroad operations on October 11, 2013 for a cost of 
US$650M. A 2% NSR applies to 26 of the unpatented mining claims that are not in the current mine plan. 

Pinto  Valley  is  an  open  pit  mine  producing  copper  and  molybdenum  concentrates.  The  administration,  ore 
processing, tailings, waste rock storage, and maintenance facilities are located on the property in close proximity to 
the pit. The processing facility consists of three crushing stages, ball mills, copper flotation stages, a molybdenum 
flotation circuit, and associated thickeners for concentrates and tailings. Two previous tailings dams have been 
rehabilitated and two tailings dams are currently operational (Figure 1). Pinto Valley also has an SX/EW facility that 
processes pregnant leach solution from low copper grade material that is leached. The SX/EW accounts for less 
than 5% of production. 

Environmental liabilities at the Pinto Valley Mine relate to the heap leach facility, tailings impoundments and 
associated engineered containment infrastructure, waste rock dumps, surface water containment structures, as 
well  as  the  removal  of  all  operational  infrastructures.  A  closure  strategy  and  a  mined  land  reclamation  plan 
detailing methods and costs associated with restoring the site to an acceptable environmental standard were most 
recently  approved  in  2016.  Surety  Bonds  totaling  $90M  have  been  filed  with  the  Arizona  Department  of 
Environmental Quality (“ADEQ”) and the Arizona State Mine Inspector in accordance with the mandate of these 
agencies  and  associated  regulations  and  policies.  These  financial  security  amounts  represent  the  estimated 
reclamation  cost  for  the  mining  operations  at  the  end  of  the  currently  permitted  mine  plan  (2026)  on  an 
undiscounted basis. Amounts are reviewed with each significant change in the mine plan or closure measures. 

The Pinto Valley Mine requires 16 permits granted from various state and federal agencies; operations of the 
railroad requires five permits mainly from the State of Arizona. Pinto Valley Mine has all the necessary permits to 
conduct mining activities, with the exception of a consolidation/renewal of existing land use authorizations (Plan of 
Operations). Pinto Valley Mine is presently working with the U.S. Forest Service (“USFS”) to develop an interim and 
a long-term renewal of its land use authorizations. An interim plan for existing disturbances to forest land will 
increase the reclamation bond by approximately $3.35M. For further details on the increase to the reclamation 
bond, please refer to page 75. The consolidated Plan of Operation was submitted to the USFS in Q2 2016 and 
deemed  complete  in  Q3.  Once  approved,  the  Plan  of  Operations  includes  tailings  storage  on  USFS  land  to 
accommodate the PV3 mine plan. As a result, the bonding requirement will likely increase by an estimated $11M. 

In conjunction with the expanded PV3 mine footprint, amendments to the current Aquifer Protection Permit will be 
needed to reflect the expanded waste rock configuration.  

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Pinto Valley Mine is accessed from US Highway 60 (“US 60”), then 5 km on paved Forest Road (“FR”) 287. The 
site can also be accessed from Tucson, Arizona (160 km to the south) by travelling north on State Route (“SR”) 77. 
The mine is 10 km west of Miami, a town of approximately 1,800 residents, and 18 km west of Globe, the County 
seat, with approximately 7,500 residents. Because of a long-standing mining tradition in the area, many local 
services are in place to supply the mine's needs, with the remaining services coming from the greater Phoenix area. 
Medical facilities are available in Miami. Fire, police, public works, transportation, and recreational facilities are in 
place and fully functioning. 

20 

 
Pinto Valley Mine’s moderate, semi-arid regional climate allows for year-round operation. The average annual 
precipitation is 480 mm. May and June are typically the driest months of the year and may result in local drought 
conditions. 

infrastructure 

Pinto  Valley  Mine  has  sufficient 
surface rights for mining operations, 
mineral  processing  facilities  and 
tailings  storage  to  mine  the  PV2 
pushbacks  (2026  mine  life).  The 
expanded  PV3  PFS  mine  plan  will 
require  permit  amendments.  Off-
site 
includes  the 
incoming electric power generation 
and transmission capacity provided 
by  the  Salt  River  Project,  the  local 
highway  system  provided  by  state 
and federal governments, the local 
transportation services provided by 
various 
the 
telephone and data communications 
systems.  Tailings  are  deposited  in 
existing  permitted  tailings  storage 
facilities. Tailings Dam  No.  4 is  the 
primary storage facility, with Tailings 
Dam No. 3 used during maintenance 
activities  at  Tailings  Dam  No.  4 
(Figure  1).  There  is  an  adequate 
source of water with potable water 
coming from four groundwater wells 
and service water from a Peak Well 
system.  

contractors, 

and 

FIGURE 1: PINTO VALLEY INFRASTRUCTURE AND LOCATION OF OPEN PIT 

The Pinto Valley Mine is located in east-central Arizona in the structural transition zone between the Sonoran 
section of the Basin and Range physiographic province to the south-southwest, and the Colorado Plateau to the 
north. The terrain surrounding the mine is generally mountainous, dominated by sharp landforms and prolific 
exposures of a variety of bedrock formations present in the region. The Pinto Valley Mine is entirely within the 
Pinto Creek watershed, where local elevations range from about 900 m to 1,500 m above mean sea level. 

The Pinto Valley Mine is near the boundary of areas mapped as the Interior Chaparral biotic community and the 
Arizona  Upland  subdivision  of  Sonoran  Desert  scrub  biotic  community,  with  plant  species  on  the  property 
characteristic of each group. Most of the animal species observed have wide environmental tolerances and are 
present in both plant communities on the property. 

History 

The Globe-Miami district is one of the oldest and most productive mining districts in the United States, with its first 
recorded production occurring in 1878. Since that time, more than 15 billion pounds of copper have been produced 
in the Globe-Miami mining district. Prior to the construction of Pinto Valley Mine, a chalcocite-enriched zone of the 
deposit was mined from 1943 until 1953 as the Castle Dome underground mine. 

The Pinto Valley open pit mine and concentrator went into production in 1974. The SX/EW plant began processing 
PLS  from  the  leach  dumps  in  1981.  In  February  1998,  mining  and  milling  operations  were  suspended  and 

21 

 
 
environmental permits were maintained during the suspension of operations, as were the water and electrical 
systems. SX/EW facilities and cathode copper production continued during the suspension of mining and milling 
operations. 

The mine has had two restarts since the 1998 shutdown. The mine resumed sulphide operations in mid-2007 for 18 
months to January 2009 and then went into care and maintenance with only leaching operations continuing. The 
second restart began in December 2012 and included extensive rehabilitation of the site and purchase of a new 
mining fleet. 

Ownership  of  Pinto  Valley  has  changed  numerous  times  since  its  inception.  At  the  time  of  construction  and 
commissioning, it was owned by Cities Service Company, who had recently merged with Tennessee Corporation. 
Occidental Petroleum Corporation acquired Cities Service Company in late 1982 and sold the Miami operations to 
Newmont Mining Corporation in 1983. At this time, the company's name was changed to Pinto Valley Copper 
Corporation. In 1986, Newmont merged the Pinto Valley Copper assets into Magma Copper Company holdings, and 
Pinto Valley Copper became the Pinto Valley Mining Division of Magma Copper Company. In 1995, Broken Hill 
Proprietary Company Limited purchased Magma Copper Company. With the merger of Broken Hill Proprietary 
Company Limited and Billiton in 2001, the Pinto Valley Mining Division became Pinto Valley Operations of BHP. In 
2013, Capstone purchased Pinto Valley Operations, now referred to as Pinto Valley Mine. 

The pre-2006 Pinto Valley drilling programs comprised a combination of core, rotary, and churn drillholes. Drilling 
documentation was limited to BHP Copper internal reports, and there were no listings for vintage data, methods 
used, or pre-2010 drilling procedures. Churn holes defined much of the early Castle Dome mineralization, which has 
been mined out. Post-Castle Dome holes were drilled on an original spacing of east-west and north-south. Later, 
drilling was done to infill the original grid spacing in some areas. Drilling that has occurred since the 1986 block 
model includes 10 core holes and 3 reverse circulation (“RC”) rotary holes drilled in 1992. From the beginning of 
1996 to April 1997, 67 RC exploration and infill holes were drilled: 48 RC holes drilled in 1996, and 19 RC holes 
drilled in 1997. The 1997 holes were drilled in the interior pit and through the Gold Gulch and Continental faults. 
Seven of the exploration holes were drilled east of the existing pit and laid the ground work for future plans of an 
east pit expansion. All drillhole collar locations were surveyed. The majority of the drillholes are vertical and, 
therefore, do not have downhole surveys. However, a majority of the inclined holes do have downhole surveys. 
From 2006 through 2008, there were drilling campaigns with various purposes, including delineation, exploration, 
geotechnical, and resource classification upgrade drilling. These include 39 drillholes in 2007 and 62 drillholes in 
2008. Diamond drillhole programs in 2010 focused on exploration, while those in 2011 and 2012 focused on infill 
drilling for resource classification upgrade in support of restarting operations. Ten holes were drilled in 2010, 40 
holes were drilled in 2011, and 64 holes were drilled in 2012. In 2013 BHP drilled 12 in-pit infill diamond drillholes 
totaling 2,853 m, to close the drillhole spacing grid and 64 in-pit RC drillholes totaling 3,380 m to help characterize 
the mineralization directly beneath working levels of the mine. 

All drillhole logging data, including collar, survey, assay, lithology, alteration, and mineralization data were entered 
into an acQuire™ structured-query-language (“SQL”) database system. All sample data were tagged and tracked 
using bar codes, which linked all assay information provided by the laboratory to the database, including the QAQC. 
The system was secured by BHP using stringent protocols and procedures. Deviations and discrepancies from 
sample dispatch reports were reported and investigated. 

A number of different companies and laboratories provided assay services to Pinto Valley over the years. Details of 
sampling and assaying procedures used during the earlier stages of operation are not readily available. Procedures 
used by outside labs that ran assays for some of the later drilling campaigns, such as those performed by Mountain 
States for the RC holes and Chemex for the AD holes, are also not readily available. The analytical procedures were 
in line with industry standards for total copper analyses, but BHP-specific procedures were used to determine acid 
soluble copper concentrations. These involved digestion with 10% sulphuric acid, followed by placement in a hot 
bath at 40°C, and read after 40 minutes. 

22 

 
Independent audits of the Pinto Valley assays were conducted in 1992 and 2000. Results indicated the assay values 
in the Pinto Valley database have been reliably entered and that total copper assays in the Pinto Valley database 
were reproducible and could be considered representative within normally-accepted error limits. 

As part of the start-up Feasibility Study done in 2006, a QAQC program was conducted on 101 randomly selected 
drillhole assay interval pulp samples and 15 randomly selected drill core assay intervals. Samples were sent to 
Skyline Assayers and Laboratories Inc. (“Skyline Labs”) in Tucson, Arizona for total copper and acid-soluble copper 
analyses. Skyline Labs was instructed to analyse the samples for acid soluble copper using BHP lab procedures. 
Certified reference material standards from the National Institute of Standards and Technology (“NIST”) were 
inserted in sequential order for analysis preceding the 15th pulp sample in the analytical run. The results indicated 
that historical quality control measures used in the Pinto Valley Mine analytical laboratory were variable. At times 
they were extremely good, but at others they were less so, although still acceptable. 

BHP Copper undertook surface mapping to provide additional data throughout the identification and selection 
phases of the PV2 mine planning project. Two drilling campaigns were conducted on separate occasions to improve 
both the geotechnical  and  geometallurgical knowledge of the deposit. The surface mapping for geotechnical 
information focused primarily on the bedding planes, major structures, and overall geological strength index. 
Various ore-types were confirmed using surface mapping and by reviewing core logs. Alteration zones and ore-
types  were  identified  in  the  pit  wall  and  correlated  against  core  samples  taken  in  previous  drill  campaigns. 
Descriptions from the core logs were used to plot the correlation between rock type and alteration zone. The most 
important ore types were narrowed down to Ruin granite, quartz monzonite, and diabase. These ore types are 
based on relative abundance, gangue mineralogy, copper grade, alteration, and the potential impact on overall 
production (recovery, throughput, and consumption of reagents/energy). Capstone relied extensively on the BHP 
Copper’s PV2 project data to complete the Capstone PV2 PFS. The data provided by BHP Copper was reviewed by 
the  QPs  in  the  Capstone  PV2  PFS  to  ensure  it  was  applicable  and  sufficiently  detailed  to  form  the  basis  of 
assumptions in the study. Additional work was conducted where data gaps were found, including field mapping for 
pit wall geotechnical analysis, geotechnical drilling for tailings impoundment design and metallurgical testing to 
validate previous test results. 

Geological Setting 

The Globe-Miami mining district of central Arizona includes porphyry copper-molybdenum (“Cu-Mo”) deposits 
associated with Paleocene Epoch granodiorite to granite porphyry stocks (65-59 million years ago). Vein deposits 
and possible exotic copper deposits are also found within the district. 

Precambrian basement rocks throughout southern Arizona and New Mexico largely consist of early Proterozoic 
Pinal Schist (~1,700 million years old) intruded by granites correlative with 1,450 Ma two-mica granite batholiths. 
At  the  Pinto  Valley  Mine  this  is  represented  by  the  Ruin  granite  (also  referred  to  as  the  Lost  Gulch  quartz 
monzonite) that hosts the Cu-Mo mineralization. The Late Proterozoic-aged (~1,420-1,150 million years old) Apache 
group, comprising conglomerate, limestone, quartzite, and minor basalt units overlying the basement rocks, was 
intruded by 1,150 million years old Apache diabase sills of varying thicknesses. These diabase units are represented 
at the Pinto Valley Mine as thin dikes and sills, and commonly contain higher copper concentrations than the 
surrounding Ruin  granite.  During  the  Paleozoic Era, various limestone units were  deposited representing the 
shallow, marine environment present over much of the southwestern US at the time. 

Subduction of the Farallon tectonic plate (80-50 million years ago) off the west coast of the southwestern US 
initiated arc magmatism responsible for generating the Cu-Mo-bearing intrusions in the region. Stocks emanating 
from the Schultze granite, the source of the mineral-bearing fluids to the Globe-Miami district, were emplaced at 
the Pinto Valley Mine between 60-59 million years ago. 

Regional Tertiary-Era Basin and Range extension and faulting following cessation of subduction facilitated the 
dismemberment, tilting, and exposure of the Cu-Mo deposits. They were preserved through deposition of the 

23 

 
Whitetail conglomerate (Oligocene Epoch) and the Apache Leap tuff (Miocene Epoch). Further extension in the 
Pliocene Epoch deposited the Gila conglomerate into basins. 

The Pinto Valley Mine deposit is bound by faults that vary in age from the Pre-Cambrian to the Tertiary. These have 
controlled the emplacement of the Ruin granite, stocks of the Cu-Mo-bearing Schultze Granite, and subsequent 
post- mineralization Basin-and-Range extensional faulting. 

Exploration 

Capstone is not currently exploring the Pinto Valley Property due to the large resource already identified, of which 
33% are reserves, resulting in a mine life to 2039. Additional resources could potentially be brought into the 
reserves in the future through operational improvements, cost reductions, and/or increased metals prices. 

Mineralization 

The primary sulphide minerals encountered at the Pinto Valley Mine are chiefly pyrite and chalcopyrite with minor 
amounts of molybdenite. Gold and silver are recovered as by-products. Sphalerite and galena occur locally in very 
small amounts. Alteration of silicate minerals of the host rocks to other groups of minerals due to the presence of 
hydrothermal  fluids  associated  with  the  Cu-Mo-bearing  intrusive  rocks  include  potassic,  argillic,  sericitic,  and 
propylitic alteration suites. 

Sulphide  minerals  generally  occur  in  veins  and  microfractures  and  less  abundantly  as  disseminated  grains, 
predominantly in biotite sites. The ore zone grades outward into a pyritic zone with higher total sulphide content. 
Molybdenum distribution generally reflects copper distribution, with higher molybdenum values usually found in 
the higher grade copper zones. Oxide mineralization and a supergene enrichment blanket was developed at the 
Pinto Valley Mine, but these areas have since been mined. 

Sulphide deposition at Pinto Valley is controlled to some extent by the host rock. The sulphide content decreases in 
Precambrian aplite intrusions. Aplite usually contains less than 0.25% copper, whereas adjacent Quartz Monzonite 
may have as much as 0.6% copper. The deficiency of copper in aplite is probably due to the absence of biotite, 
which makes up about 7% of Quartz Monzonite. Disseminated chalcopyrite shows an affinity for biotite, where it is 
disseminated through the biotite or partially replacing it. Additional chalcopyrite is also present in veins cutting 
both rock types. 

Drilling 

In 2014, ten geotechnical holes, and in 2015, an infill RC program consisting of 43 holes aimed at 2016 and 2017 
production, as well as three geotechnical holes were drilled and assayed. Data from these drill programs have been 
incorporated into the 2015 block model. 

Sampling and Analysis 

Capstone has not undertaken any exploration work since acquiring the Pinto Valley Mine. Details pertaining to 
sampling during  drilling  programs  completed before Capstone ownership is found above in the section titled 
History. 

As a part of the data verification process, Garth Kirkham, P.Geo, an independent Qualified Person as defined by NI 
43-101 and co-author of the NI 43-101 Technical Report, Pinto Valley Mine 2014 Prefeasibility Study, visited the 
property on May 14, 2013 and April 16-17, 2015. The site visits included an inspection of the core logging facilities, 
offices, outcrops, historic drill collars, core stage facilities, core receiving area, core sawing stations, and a tour of 
the major centres and surrounding towns that are affected by the mining operation. 

Mr. Kirkham randomly selected four complete drillholes from the database and laid the core out at the core storage 
area. Site staff supplied  the  logs  and  assay sheets so he could verify the core and logged intervals. The data 
correlated with the physical core and no issues were identified. In addition, Mr. Kirkham toured the complete core 

24 

 
storage facility, pulling and reviewing core throughout the tour. No issues were identified and drilling recoveries 
appeared to be very good to excellent. 

Mr. Kirkham was confident the data and results were valid based on the site visit and inspection of all aspects of 
the project. This confidence extended to the sampling methods and procedures used. In Mr. Kirkham’s opinion, all 
work, procedures and results have adhered to best practices and industry standards required by NI 43-101. No 
duplicate or verification samples were taken to verify assay results, but the author believes that the work is being 
conducted by a well- respected, large, multi-national company that employs competent professionals who adhere 
to  industry  best  practices  and  standards.  Mr.  Kirkham  also  visited  Skyline  Labs  and  deemed  the  lab  to  be 
professionally operated, as is expected from a widely-used North American laboratory facility. Skyline Labs has 
been ISO 17025 certified since 2008. 

Mineral Resource and Mineral Reserve Estimates 

The mineral resource estimate for Pinto Valley mineralization was completed by independent consultant and 
Qualified Person, Garth Kirkham, P.Geo., of Kirkham Geosystems Ltd., as a part of the PV3 PFS summarized in the 
Pinto Valley Mine 2016 Prefeasibility Study NI 43-101 Technical Report. The mineral resources were estimated 
using accepted industry standards conforming to NI 43-101 requirements. Surfaces and solids were supplied by 
Pinto Valley Mine staff for the lithology domains, grade shells, and major faults. Drillhole samples were composited 
downhole to 13 m (45 feet) length to match the selective mining unit (“SMU”) bench height and to reduce the 
influence of typically narrow, very high-grade samples. A radius of 45 m has been applied to values greater than 
1.6% total copper (“TCu”) and 0.05% molybdenum (“Mo”). The average bulk dry density for ore-grade mineralized 
rock, primarily Ruin Granite, is 2.51 t/m3 (12.75 ft3/ton). Although the in-situ bulk dry densities for all Pinto Valley 
Mine rock types range between 2.46 t/m3 (13.0 ft3/ton) for Whitetail conglomerate to 2.64 t/m3 (12.1 ft3/ton) for 
Pinal schist, 12.75 ft3/ton was used. Grade variability is low, with nugget effects of less than 15% for both copper 
and molybdenum. The block model grades for copper and molybdenum were estimated using ordinary kriging into 
blocks that were 30 m Easting × 30 m Northing × 14 m Elevation (100 ft × 100 ft × 45 ft) in size. During grade 
estimation, search orientations were designed to follow the general trend of the mineralization in each of the zone 
domains. The estimation plan involved a single search pass using a minimum of 2 composites and a maximum of 16 
composites, with a maximum of 4 from any single drillhole. 

The reported mineral resources  in  Table 1 are based on the mineral  resources estimate completed by Garth 
Kirkham, P.Geo., and reflect the mined topographic surface as at December 31, 2016. No mineral resource update 
was  undertaken  during  2016.  Jeremy  Vincent,  P.Geo.,  Manager  of  Production  and  Development  Geology  at 
Capstone  and  a  Qualified  Person  as  defined  by  NI  43-101,  oversaw  the  production  depletion  of  the  mineral 
resources model. Mineral resources are reported above a 0.17% Cu cut-off grade within a reasonable economic 
prospects pit that use the following parameters: US$ 3.30/lb Cu, US$ 10.00/lb Mo, 88% Cu recovery, 50% Mo 
recovery, US$ 1.50/ton mining costs, $1.50/ton G&A costs, $5.00/ton milling costs, and a pit slope angle of 45°. 

TABLE 1: PINTO VALLEY MINERAL RESOURCES AT 0.17% TCU CUTOFF, AFTER 1 JANUARY 2017 (METRIC UNITS) 

Tonnes (millions) 
627 
774 
1,401 
126 

Classification 
Measured (M) 
Indicated (I) 
Total M & I 
Inferred 
NOTE: Garth Kirkham, P.Geo., FGC, of Kirkham Geosystems Ltd., is the Qualified Person responsible for the Pinto Valley mineral resources estimate.  Mineral 
resources are not mineral reserves and do not have demonstrated economic viability. Mineral resources are presented inclusive of mineral  reserves. Mineral 
resources are reported as at December 31, 2015. Mineral resources are reported above a 0.17% TCu cut-off grade. The economic  assumptions for the 
reasonable prospects pit include: US$ 3.30/lb Cu, US$ 10.00/lb Mo, 88% Cu recovery, 50% Mo recovery, US$ 1.50/ton mining costs, US$ 1.50/ton G&A costs, US$ 
5.00/ton milling costs, and a pit slope of 45°. Totals may not tally due to rounding. 

Contained Mo (Mt ) 
0.05 
0.05 
0.10 
0.01 

Contained Cu (Mt) 
2.12 
1.99 
4.11 
0.31 

%Mo 
0.008 
0.006 
0.007 
0.005 

%Cu 
0.34 
0.26 
0.29 
0.25 

The mineral reserve was developed by John Marek, PE, President of Independent Mining Consultants, Inc. (“IMC”) 
and was done in line with industry guidelines by tabulating the contained measured and indicated (proven and 

25 

 
probable) material inside of the designed pit at the mill cutoff grades. The schedule utilizes a variable cutoff grade 
to the mill that fluctuates between 0.17 to 0.22 %TCu, resulting in a low-grade stockpile that is processed at the 
end of the mine life. Stockpile material is included in the reserve. The final pit design and the mineral reserve do 
not include the low grade leach dump material in the economic analysis or mineral reserve. The reserves design 
was completed at $2.75/lb copper and $12.50/lb moly. The effective date of the mineral reserve is January 1, 2016. 
Patricia Maloney, P.E., Superintendent of Mine Engineering at Pinto Valley Mine and a Qualified Person as defined 
by NI 43-101, oversaw the production depletion of the mineral reserves model. To simplify the mineral reserve 
reporting process, the cut-off grade was changed from the variable 0.17-0.18% Cu to 0.175% Cu. This cut-off closely 
approximates the reported mineral reserves and will be used going forward. 

TABLE 2: PINTO VALLEY MINERALS RESERVES, REMAINING AFTER 1 JANUARY 2017 (METRIC UNITS) 

Cutoff 

Ore 

Class 

Proven 
Probable 
Proven and Probable 
NOTE: John Marek, PE, President of Independent Mining Consultants, is the Qualified Person responsible for the Pinto Valley mineral reserves  estimate. 
Economic inputs to the block model were USD$2.75/lb Cu and USD$12.50 Moly. Summation errors due to rounding. 

Cu % 
0.175 
0.175 
0.175 

M tonnes 
332.5 
122.8 
455.2 

% Mo 
0.009 
0.008 
0.009 

Cu % 
0.33 
0.25 
0.31 

Mining Operations 

Run-of-mine ore is crushed through the primary crusher and conveyed to the fine crushing plant for further size 
reduction. The fine-crushed ore is fed to a conventional grinding and flotations circuit to produce a bulk copper 
concentrate and molybdenum concentrate. The concentrates are thickened and filtered to produce products 
suitable for transport. Tailings are thickened and deposited in one of the two active tailings storage facilities (TSF3 
and TSF4). Low-grade mineralization is leached and the pregnant solution is processed through an SX/EW plant that 
exists on the property. However, no additional low-grade ore is being placed under leach in accordance with the 
mine plan. 

The copper concentrates and cathodes produced from Pinto Valley Mine is sold to smelters and traders. The high 
quality of the concentrates makes it sought after by both smelters and traders. Pinto Valley has well-established 
environmental  protocols  that  adhere  to  federal  and  state  regulatory  requirements  and  to  internal  corporate 
guidance to reduce impacts to the environment. Pinto Valley is subject to environmental regulations addressing 
groundwater, surface water, storm water management; air quality; well installation; water withdrawal from state 
aquifers; waste handling and disposal; handling and storage of toxic substances; surface reclamation; and cultural 
and biological resources. The Pinto Valley Mine has all the necessary permits to conduct mining activities through 
2026, with the exception of the consolidated Plan of Operations that is currently under review by the USFS. The 
consolidated Plan of Operations is a compilation of prior authorizations and encroachments on federal lands. 

The Pinto Valley Mine’s applicable taxes include the following: 

•  Corporate Taxes – the combined US Federal and Arizona state corporate income tax is calculated at a 
blended 36.35% rate applied on taxable income. The Alternative Minimum Tax (“AMT”) is calculated at a 20% 
rate applied  on an adjusted amount of taxable income. A taxpayer pays the higher amount of regular Federal 
income tax and  the AMT. If AMT is paid, it may generally be used as a credit against regular tax in future 
years to the extent  regular tax is greater than AMT. 

•  The  Arizona  state  severance  tax  on  metalliferous  minerals  is  charged  at  a  2.5%  rate  on  50%  of  the 

difference  between the gross value of production and production costs. 

•  Gila County property taxes are administered by the Arizona Department of Revenue. 

26 

 
 
 
 
Exploration and Development 

We do not currently have any planned exploration activities at the Pinto Valley Mine but from time to time we do 
undertake in-pit drilling to better define mineral reserves for short-term planning purposes. This data is then 
incorporated periodically into the global block model. Our development activities are focused on execution of the 
PV3 mine plan. 

Cozamin Mine (Mexico) 

The Cozamin Mine is the subject of a report titled “Technical Report on the Cozamin Mine, Zacatecas, Mexico” 
dated August 5, 2014 with an effective date of July 18, 2014 (the “Cozamin Report”). This technical report was 
prepared by Patrick Andrieux, PhD., P.Eng., Itasca Consulting Group, Inc.; Dave Hallman, PE, Tetra Tech, Inc.; Jenna 
Hardy, P.Geo., Nimbus Management Ltd.; Mel Lawson, SME-RM, Stantec Consulting International LLC; Ken Major, 
P.Eng.,  KWM  Consulting  Inc.;  Vivienne  McLennan,  P.Geo.,  Capstone  Mining  Corp.;  Allan  Schappert,  SME-RM, 
Stantec Consulting International LLC; Ali Shahkar, P.Eng., Lions Gate Geological Consulting Inc.; Robert Sim, P.Geo., 
Sim Geological Inc.; Brad Skeeles, P.Eng., Capstone Mining Corp.; and Jeremy Vincent, P.Geo., Capstone Mining 
Corp., each a Qualified Person as defined by NI 43-101. Reference should be made to the full text of this report, 
which is available in its entirety on SEDAR at www.sedar.com under Capstone’s profile. 

All scientific and technical information in this summary relating to any updates to the Cozamin Mine since the date 
of the Cozamin Report, other than the mineral resource and mineral reserve estimates, has been reviewed and 
approved by Qualified Persons who supervised the preparation of updates to elements of the Cozamin Report. 
These Qualified Persons include those listed in Interests of Experts in this Annual Information Form. 

Project Description and Location 

The Cozamin Mine is an operating polymetallic mine with a 3,300 tonne per day capacity, located in the Morelos 
Municipality of the Zacatecas Mining District, near the south-eastern boundary of the Sierra Madre Occidental 
Physiographic Province in North-central Mexico. The mine and processing facilities are located near coordinates 22° 
48’ N latitude and 102° 35’ W longitude on 1:250,000 Zacatecas topographic map sheet (F13-6). The Cozamin Mine 
comprises 88 concessions covering approximately 4,308 ha. 

Capstone acquired the project in January 2004, which is 100% owned by Capstone, subject to a 3% NSR payable to 
Grupo Bacis S.A. de C.V., a Mexican resource company. Mineral claims acquired in September 2009 from Minera 
Largo S de RL de CV, a wholly owned subsidiary of Golden Minerals Company (“Golden Minerals”), are subject to 
future cash payments of a NSR of 1.5% on the first one million tonnes of production and cash payments equivalent 
to a 3.0% NSR on production in excess of one million tonnes from the acquired claims. The NSR on production in 
excess of one million tonnes also escalates by 0.5% for each $0.50 increment in copper price above $3.00 per 
pound of copper. In 2014, we acquired 45 additional concessions from Golden Minerals totalling 775 ha that 
surround the Cozamin Mine’s existing concessions. A total of 17 of the claims are subject to a finder’s fee to be paid 
as a 1.0% NSR or Gross Proceeds Royalty to International Mineral Development and Exploration Inc. pursuant to 
existing agreements on the concessions dating back to October 1994 and August 2000. The Cozamin property 
requires payment of mining duties on the mining concessions semi-annually in January and July, plus annual land 
payments for surface use. Mining duties totalled US$ 41,945 in 2014, US$ 59,520 in 2015 and US$ 46,805 in 2016. 

The Cozamin Mine lies within a regionally mineralized area that has seen extensive historic mining over more than 
475 years. Host  rocks  surrounding  the mineralized vein systems are anomalous in base and  precious metals, 
providing a detectable halo of elevated metal values that extends a considerable distance beyond the known 
workings. Numerous old mine workings, excavations and dumps, and historic tailings are present, both on, and 
adjacent to, the Cozamin mine site; some lie on mining lands held by Capstone and others are held by third parties. 

Prior to Capstone’s involvement in the Cozamin Mine, several environmental studies had been carried out by 
previous owners. The San Roberto Mine had previously been fully permitted to operate at 750 tpd. Capstone 

27 

 
formally received its operating permit on October 20, 2006. This is known in Mexico as a Licencia Ambiental Única 
(“LAU”). A LAU for a throughput expansion to 2,600 tpd was received on March 25, 2008. On January 19, 2009, 
application was made to modify the LAU to expand throughput to 3,000 tpd, which was granted in May of that 
year. In January of 2011, further application was made to increase the permitted throughput from 3,000 tpd to 
4,000 tpd, which was granted in November of 2011. The permit to operate at throughput up to 4,500 tpd capacity 
was granted in June 2015. 

The Cozamin Mine’s mineral resources and mineral reserves are situated primarily within a mineralized vein/fault 
structure known as the Mala Noche Vein (“MNV”) that strikes east-west and dips to the north. This structure hosts 
the copper-rich San Roberto Mine and adjacent to the east, the zinc-rich San Rafael Mine. In 2010, we discovered 
the  MNFWZ,  a  vein  splay  off  the  MNV  vein  on  the  footwall  side  oriented  northwest-southeast.  Capstone  is 
currently exploring for extensions to mineralization found at MNV, San Rafael, and MNFWZ. Figure 2 illustrates the 
location of project infrastructure and the surface projection of the MNV. 

FIGURE 2: COZAMIN INFRASTRUCTURE AND LOCATION OF MINERAL RESOURCES AND RESERVES. 

Environmental studies have shown that flotation tailings and some types of waste rock have the potential to 
generate acidic drainage. However, the country rocks surrounding the deposit have significant neutralizing capacity 
and show relatively low permeability. In addition, construction activities as a part of the expansions have already 
reduced  identified  sources  of  acidic  drainage  associated  with  the  historic  tailings  impoundment  as  well  as 
downstream  contamination  due  to  tailings  spills  by  previous  operators.  An  environmental  management  and 
monitoring program is currently underway and will be ongoing for the life of mine. Data collected are being used to 
define  an  operational  environmental  management  and  monitoring  program,  which  will  include  appropriate 
environmental management and mitigation plans based on the principle of continuous improvement. These will be 
reviewed and revised as necessary, on at least an annual basis, with results reported as required to Mexican 
regulators. 

Other issues of environmental concern relate to potential impacts comparable to those in underground mines of 
similar size with flotation tailings impoundments. These include: dust, tailings handling/management, storm water 
diversion, combustibles and reagent management/handling, waste management and disposal and noise. Work to 
date indicates that environmental impacts are manageable. Cozamin was awarded the Clean Industry Certification 
from Mexico’s Federal Attorney for Environmental Protection (Procuraduría Federal de Protección al Ambiente or 
PROFEPA) for the third time in December 2015 for this management process and best practices and procedures. 
This is valid until November 2017. 

28 

 
 
 
Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Cozamin Mine is located 3.6 km to the north-northwest of the city of Zacatecas, the Zacatecas state capital. 
The  municipality  of  Zacatecas  has  a  population  of  approximately  138,000  people.  Other  communities  in  the 
immediate vicinity of the project include Hacienda Nueva (3 km west), Morelos (5 km northwest) and Veta Grande 
(5  km  north).  The  Cozamin  Mine  operates  year  round  and  is  accessible  via  paved  roads  to  the  project  area 
boundary where good, all-weather roads provide access to the mine and most of the surrounding area. The mine 
area falls within the Hacienda Nueva and La Pimienta Ejidos. 

The Cozamin Mine has excellent surrounding infrastructure including schools, hospitals, railroads, highways, and 
electrical power. The mine has access to a power line and substation that allows Capstone to draw up to 10.5 MW 
from the national power grid. Generators (both operating and back-up) on site have a capacity of 2.0 MW. At 
present there is sufficient capacity to store all of the tailings from the processing of identified mineral reserves 
assuming the Stages 6 and 7 lifts are constructed. Permits are not currently issued for all of these additional raises 
to  the  tailings  storage  facility.  Employees  and  contractors  are  sourced  from  Zacatecas  and  other  nearby 
communities with minimal foreign staff at the mine. Sufficient surface rights have been obtained to conduct all 
mining operations. 

The climate in the region is semi-arid with maximum temperatures of approximately 30°C during the summer and 
minimum temperatures in the winter producing freezing conditions and occasional snow. The rainy season extends 
from June until September, with average annual precipitation totalling approximately 500 mm. As the certainty of 
runoff into the tailings pond cannot be predicted, additional water resources have been secured, with further water 
rights undergoing evaluation. 

The Cozamin Mine is located in the Western Sierra Madre Physiographic Province near the boundary with the Mesa 
Central Province (Central Plateau Province). The Zacatecas area is characterized by rounded northwest trending 
mountains with the Sierra Veta Grande to the north and the Sierra de Zacatecas to the south. Elevations on the 
property vary from 2,400 m to 2,600 masl. The Zacatecas area is located between forested and sub-tropical regions 
to the southwest and desert conditions to the northeast. Vegetation consists of natural grasses, mesquite or 
huizache and crasicaule bushes. Standing bodies of water are dammed as most streams are intermittent. 

History 

In pre-Hispanic times, the area was inhabited by Huichol people who mined native silver from the oxidized zone of 
argentiferous  vein  deposits  in  the  Zacatecas  Mining  District.  During  the  Spanish  Colonial  era  production 
commenced in 1548 at 3 mines: the Albarrada mine on the Veta Grande system, and the San Bernabe mine and Los 
Tajos del Panuco on the Mala Noche Vein system. The initial operations worked only the oxide minerals for silver 
and some gold, and later the sulphide-mineral zones were worked for base and precious metals. 

From 1972, Consejo de Recursos Minerales (“CRM”) worked mines in El Bote, La Purisima and La Valencia zones. A 
number of old workings are located throughout the mine area, but accurate records of early production are not 
available. Historic production from the Zacatecas district is estimated by the CRM (1992) to be 750 million ounces 
of silver from 20 million tonnes grading over 900 g/t Ag and approximately 2.5 g/t Au. Lead, zinc and copper have 
also been recovered but the production and grades were not estimated. 

Minera Cozamin was established in 1982 by Jack Zaniewicki who consolidated concession holdings over much of 
the Mala Noche Vein and operated the San Roberto Mine and plant at 250 tpd until October 1996. During this 
period,  Industrias  Peñoles  S.A.  de  C.V.  (“Peñoles”)  undertook  exploration  in  the  district  but  did  not  buy  any 
significant concessions. In all, it is estimated that 1.2 million tonnes of ore were mined and processed at the 
Cozamin Mine prior to October 1996. 

In October 1996, Zaniewicki sold Cozamin to Minera Argenta, a subsidiary of Minera Bacis S.A. de C.V. (“Bacis”). 
Bacis expanded the mill to a 750 tpd flotation plant, and processed 250,000 tonnes of ore grading 1.2% Cu, 90 g/t 

29 

 
Ag, 0.5 g/t Au, 1.8% Zn and 0.6% Pb from 1997 to the end of 1999, mainly from shallow, oxide zone workings. Bacis 
developed resources principally by drifting and raising on the Mala Noche Vein within the San Roberto (Cozamin) 
mine. Diamond drilling was only used as an exploration tool to identify areas with mineralization peripheral to the 
developed mine workings. Near the end of 1998, Bacis closed the mine primarily due to low metal prices and 
under-capitalization of the asset. Capstone  assumed ownership of the Cozamin Mine in 2004. 

Geological Setting 

The Zacatecas Mining District covers a belt of epithermal and mesothermal vein deposits that contain silver, gold 
and base metals (copper, lead and zinc). The district is in the Southern Sierra Madre Occidental Physiographic 
Province near the boundary with the Mesa Central Physiographic Province in north-central Mexico. The dominant 
structural features that localize mineralization are of Tertiary Era age, and are interpreted to be related to the 
development of a volcanic centre and to northerly trending basin-and-range structures. It occurs in a structurally 
complex setting, associated with siliceous subvolcanic and volcanic rocks underlain by sedimentary and meta-
sedimentary  rocks.  The  geologic  units  in  this  area  include  Triassic-aged  metamorphic  rocks  of  the  Zacatecas 
Formation  and  overlying  basic  volcanic  rocks  of  the  Upper  Jurassic-aged  or  Lower  Cretaceous-aged  Chilitos 
Formation. The Tertiary rocks consists mainly of a red conglomerate unit deposited in the Paleocene Epoch and/or 
Eocene Epoch, and overlying rhyolitic tuff and intercalated flows that were deposited from Eocene to Oligocene 
Epochs. Some Tertiary Era rhyolite bodies cut the Mesozoic Era and Tertiary Era units and have the appearance of 
flow domes. 

The host rocks for the MNV are intercalated carbonaceous meta-sedimentary rocks and andesitic volcanic rocks 
ranging in age from Triassic to Cretaceous, and Tertiary-aged rhyolite intrusive rocks and flows. Mineralization in 
the MNV appears to have been episodic. A polymetallic dominant phase is interpreted as one of the last stages of 
mineralization at Cozamin. In general, this polymetallic phase was emplaced into an envelope of pre-existing vein 
hosting  moderate  to  strong  zinc  and  lead  mineralization  and  moderate  silver  mineralization.  Thus,  the  host 
lithology to the vein does not appear to have influenced the strength of the polymetallic phase of mineralization 
which is typically enveloped by earlier vein material. 

Exploration 

Cozamin exploration geologists have systematically mapped a total of 1,694 ha throughout the Cozamin Mine 
property at scales of 1:1,000 or 1:2,000 since 2004. Regular surface exploration along the strike of the MNV system 
has occurred through channel sampling and chip sampling. Channel samples were cut perpendicular to the strike of 
the vein and weighed approximately 2 kg. The results of the surface channel and chip sampling programs have been 
used to assist with exploration drillhole planning, but not used for mineral resources estimation. In 2015, 150 
hectares were remapped at a scale of 1:2000 predominantly in the San Rafael area. 

Capstone undertook several geophysical surveys using contractors between 2004 and 2010. A ground magnetic 
survey completed by Zonge Engineering and Research Organization (“Zonge”) in 2004 collected total magnetic field 
data from 24 north-oriented lines spaced 25 m apart that permitted mapping of the linear east-west orientation of 
the Mala Noche  system  as  well as other intrusive features. Also in 2004, Zonge undertook a resistivity study 
through measurement of magnetic response using Controlled Source Audio Magnetotellurics over 8 line-kilometres 
and  Natural  Source  Audio  Magnetotellurics  over  16  line-kilometres  indicated  the  presence  of  sulphide 
mineralization below  known  mineralized extents. These results were used to assist with exploration drillhole 
planning. During the summer of 2009 New Sense Geophysics Limited conducted an aeromagnetic survey over all of 
the Cozamin Mine concessions. The results revealed a broad magnetic high trending northwest. These data were 
later reprocessed in 2013 and used for tracking infrastructure such as power lines and pipe lines and the general 
structural and vein trends of the Mala Noche system. In some cases the data were used as a secondary tool to help 
guide exploration and drill planning in new target areas. Between October 2009 and January 2010 Zonge completed 
resistivity and ground-induced polarization studies centred over Mala Noche West, Hacienda Nueva South, Mala 
Noche North, and Mala Noche East. Identified anomalies were followed up by drilling, but the results were poor. 

30 

 
The presence of sulphide-rich and graphitic sedimentary rocks coupled with close proximity to populated areas 
(buried pipes, fences, etc.), likely precluded effective chargeability, resistivity, or conductivity surveys, and as such 
we have not explored using geophysical methods since 2010. In 2015, Condor Consulting Ltd. conducted a full 
review of all previous geophysical surveys and determined the most likely effective geophysical survey method for 
future exploration targeting is total field magnetics and derivative products. 

Mineralization 

All mineralization at the Cozamin Mine occurs primarily in the Mala Noche fault-vein structure (“MNV”). In the San 
Roberto Mine, the MNV strikes west-northwest and the dip varies between 38° to 90° to the north. There is a clear 
association of higher copper grades with steeper dips of the Mala Noche fault structure. Where the MNV is weakly 
mineralized, it appears that the principal alteration in this fault is quartz-pyrite. 

The main stage of copper-dominant mineralization at the Cozamin Mine is classified as intermediate sulphidation, 
high-  temperature  epithermal  transitioning  at  depth  to  more  mesothermal-like  mineralization.  The  copper-
dominant stage of mineralization appears to cut across or overprint earlier more clearly epithermal-type zinc-
dominant  mineralization.  The  epithermal  veins  display  well  banded  quartz  veins,  sulphide  pseudomorphs  of 
carbonates, open space fillings, and quartz vuggy linings. The higher temperature veins have significantly less vugs, 
and the veins can be massive pyrrhotite-pyrite- chalcopyrite. 

Pyrite is the dominant vein sulphide and typically comprises approximately 15% of the MNV in the San Roberto 
mine. Pyrrhotite commonly occurs  as an envelope to, or intermixed with, strong chalcopyrite mineralization. 
Chalcopyrite is the only copper sulphide recognized megascopically at the Cozamin Mine. Like pyrrhotite, it is more 
common at the intermediate and deeper levels of the mine. It occurs as disseminations, veinlets and replacement 
masses. Sphalerite is the dominant economic sulphide in the upper levels in the San Roberto mine. Most of the 
sphalerite is marmatitic. It occurs as disseminations and coarse crystalline masses and is commonly marginal to the 
chalcopyrite-dominant portion of the vein. Argentiferous (silver-bearing) galena is less common than sphalerite but 
is  generally  associated  with  it  as  crystalline  replacement  masses.  Arsenopyrite  typically  occurs  as  minor, 
microscopic inclusions in pyrite. Argentite is the most common silver mineral. It has been identified microscopically 
occurring as inclusions in chalcopyrite and pyrite. Gangue minerals in the MNV consist of quartz, silica, calcite, 
chlorite, epidote and minor disseminated sericite. The quartz occurs as coarse grained druse coarse crystalline 
masses, and a stockwork of quartz veinlets. 

This transition from epithermal zinc dominant mineralization to copper-dominant mesothermal mineralization is 
thought to be the result of an evolving, telescoping hydrothermal system that was epithermal in its early stages and 
became mesothermal as the hydrothermal migrated upwards. This telescoping hydrothermal system is closely 
associated with the district’s largest centre of rhyolite flow domes that may be the upward expression of a felsic 
stock. 

The dominant mineralized vein on the Cozamin Mine is the MNV. This vein has been traced for 5.5 km on surface 
on the property. It strikes approximately east-west and dips on average at 60° to the North. There are at least 18 
shafts that provide access to the historical workings at Cozamin. The largest of these is the San Roberto mine which 
has a strike length of 1.4 km. The vertical extent of mineralization at San Roberto is over 820 m. Adjacent to the San 
Roberto mine is the San Rafael mine, a zinc-rich part of the deposit with the same epithermal mineralization 
characteristics as the San Roberto mine. The MNFW zone, a splay off of the footwall side (south side) the MNV 
discovered  in  2010,  is  not  exposed  at  surface;  however,  based  on  underground  drill  definition  it  strikes  in  a 
northwest-southeast orientation over an explored distance of 1.45km and dips on average 54° to the northeast. 
Known base metal mineralization here has a vertical extent of approximately 500 m. The MNFW zone comprises up 
to five veins, two of which are volumetrically significant, in close spatial association with rhyolite dikes and locally 
the  veins  cross-cut  the  intrusions  themselves.  The  relative  age  of  the  copper  mineralization  ranges  from 
contemporaneous, to early post-rhyolite magmatism. 

31 

 
Drilling 

In all, 692 diamond drillholes of HQ and/or NQ diameter have been completed from surface and from underground 
locations at the Cozamin Mine since April 2004. A total of 13 phases of drilling have targeted resource definition 
and expansion along the MNV (San Roberto and San Rafael mines), MNFWZ (since discovery in 2010), and other 
exploration targets on our property. This includes an infill program targeting zinc-rich mineralization in the upper 
parts of the San Roberto zone, as well as infill drilling in the San Rafael zone. 

Drillhole collars are located using a total station TRIMBLE instrument, model S6. Downhole survey readings were 
recorded using either an Eastman Single Shot, FLEXIT SensIT or Reflex EZShot instrument. Survey readings are 
generally taken every 50-150 m for surface holes and every 50-100 m for underground holes. Survey results were 
corrected for magnetic declination. 

In the core logging facility drillholes are assessed for drilling recovery, which has historically been very good. 
Drillholes are then logged for geology, alteration and mineralogy, followed by structural data measurements and 
rock quality (RQD) assessment. Next, the drillholes are marked for sampling by the geologist. This is followed by 
core photography before the core is sent for cutting. 

Sampling and Analysis 

We use diamond drillcore samples for mineral resources estimates. Diamond drillholes intersecting the MNV are 
spaced approximately 60 m along strike and down dip. Mineralization is less continuous in the MNFW zone than in 
the  MNV,  thus  drillholes  are  more  closely  spaced  averaging  approximately  50  m  along  strike  and  down  dip. 
Capstone employees are responsible for the all on-site sampling of drill core. The entire vein width is sampled. 
Typical sample intervals for drillcore are 0.5 m in the vein and 2 m in the wallrock (waste). Very high grade intervals 
are  marked  out  and  sampled  separately  from  lower  grade  zones.  Sample  boundaries  are  based  on  mineral 
proportions and/or texture (e.g. massive versus disseminated). Drillcore samples are split by core saw and placed in 
marked bags and shipped to accredited external laboratories for sample preparation and analysis for copper, lead, 
zinc, silver, and sometimes gold. There were a total of 50,007 diamond drillhole samples contained in the database 
used for the June 2016 mineral resources estimate. Capstone employees are responsible for all on-site sampling of 
drill core. 

Sample quality of drillhole samples is monitored through regular insertion of reference material standards, blanks, 
and duplicate samples. Certified reference material standards are purchased commercially and are also created 
from MNV material. QAQC procedures include real-time monitoring of quality control data, thresholds for sample 
failures and sample batch reanalysis, and regular monthly reporting. QAQC results demonstrate that drillhole assay 
values are accurate, repeatable, and free from cross-contamination. 

A  bias  analysis  between  diamond  drillhole  and  CCS  samples  located  within  the  mineralized  structures  was 
completed as a part of the March 2014 resource update. CCS were found to be consistently higher-grade than the 
diamond drillhole samples. They were not included during the 2016 model update. Further investigation into the 
nature of the bias is required before potential reincorporation into the resource model can be considered. No other 
drilling, sampling, or recovery factors have been identified that could materially impact the accuracy or reliability of 
the results. 

The Cozamin Mine collects bulk density measurements from mineralized and non-mineralized intercepts from each 
drillhole. All drillcore pieces greater than 10 cm in length within an assay sample length are selected from the core 
box and measured using a weight-in-air weight-in-water technique. A review of these data highlighted widely 
ranging values, which were reanalysed as a part of a quality control check. The QAQC samples indicated the bulk 
density dataset was of sufficient quality for use in mineral resource estimation. There are 20,878 bulk density 
measurements in the database available to estimate density. 

32 

 
Database validation work comprises a check of 10% of all new records entered into the database as a part of the 
mineral resource update process. This includes verification of collar, downhole survey, lithology, assay, and bulk 
density data. This was completed as a part of the June 2016 mineral resource update. Other data checks included 
validations of the spatial locations of mineralized drillhole intercepts and the locations of CCS data with respect to 
underground mapped geology. Errors were noted and corrected. There were eight drillholes excluded from the 
geological modelling and resource estimation process because either the logged vein intercepts fell outside of 
modelled vein structures, or they intercepted the vein at a very shallow angle.  

Security of Samples 

Only employees of Capstone entities are permitted in the core shack when unsampled drillcore is ready to be cut. A 
minimum of 10 samples are placed in a large sack and secured by a tamper proof seal. A transmittal form is then 
completed, which identifies the batch number, the serial numbers of the seals and the corresponding sample 
number series, and delivered to the sample preparation laboratory by a Cozamin representative. 

Drill core containing intercepts of the Mala Noche Vein and Mala Noche Footwall structure is stored in a secured 
warehouse near the core shack. Waste hanging wall and footwall drill core is kept in a secure storage facility on the 
property and within the mine on Level 8. Access to the warehouse and storage facilities are controlled by the Mine 
Geology Department. No person other than the geologists responsible for logging is permitted to handle the core 
prior to sampling. 

Mineral Resource and Mineral Reserve Estimates 

In June 2016, the San Roberto and Mala Noche Footwall zone mineral resource models were updated by Jeremy 
Vincent, P.Geo., Manager of Production and Development Geology for Capstone, and a Qualified Person as defined 
by NI 43-101. The updated models take into account infill drilling completed to March 31, 2016. In addition, the San 
Rafael zone, previously modelled in 2009, was also refreshed in anticipation of an investigation into the viability of 
blending zinc-rich San Rafael ore with material mined from the San Roberto and MNFW zones. These updates are 
contained within two separate block models: the Mala Noche Vein (“MNV”) block model contains the updated San 
Roberto and San Rafael zones, and the Mala Noche Footwall Zone (“MNFWZ”) model, is rotated parallel to the 
dominant strike direction of the MNFWZ structure.  

All geological modelling was undertaken using the Aranz Geo implicit modelling software, Leapfrog®. It comprised a 
lithological model to assist with exploration targeting and mining planning activities, as well as a mineralization 
model  defining  the  mineralized  MNV  and  MNFWZ  structures.  The  veins  were  defined  using  logged  and 
underground-mapped contacts in combination with as US$ NSR 30/t cut-off where mineralization boundaries were 
not exclusively defined in a vein structure.  

All samples were composited to a 2 m length. This was followed by an exploratory data analysis that showed a 
moderate correlation between copper and silver in the San Roberto, San Rafael, and MNFW zones. In the San 
Rafael zone, zinc and lead also showed a moderate correlation. Ideally, to maintain correlations during estimation, 
multivariate techniques such as full co-kriging or decorrelation transforms are used; however, if the elements have 
similar variogram properties, then the correlations can still be adequately maintained using independent univariate 
estimation. This latter option was followed and is explained further below. The coefficient of variation (“COV”), 
which measures the spread of a distribution relative to its mean, was reviewed for each element to help assess the 
need for top cutting and to confirm the selected Ordinary Kriging (“OK”) estimation method was appropriate. A 
COV of less than 1.5 is desired for OK grade estimation, which was found for copper, silver, and zinc. Minor top cuts 
were needed for these elements. Lead had a COV higher than 2 resulting from a longer high-grade tail of samples. 
This aligns with underground observations where lead can be found in high-grade patches. As such, a combination 
of top cutting and search restrictions were used to limit the influence of the high-grade samples so as to not over-
estimate lead grades. 

33 

 
The three-dimensional spatial relationships of each element were assessed on the top-cut, composited data was 
undertaken using normal-score transformed semi-variograms. Search ellipses were set to vary dynamically during 
grade estimation to account for the local variations in strike and dip along the veins. The same variogram and 
search parameters were used for copper and silver in all domains, and for zinc and lead in the San Rafael zone to 
maintain the element correlations.  

Grades were estimated into 12 m Easting × 2 m Northing × 10 m Elevation blocks in a sub-blocked model (in the 
MNFW zone model the blocks were rotated parallel to the strike of the mineralization). Bulk density samples were 
composited to 2.0 m lengths downhole and estimated using inverse distance weighting. Model validation included 
visual validation of grades against composited drillhole samples, creation of swath plots along easting, northing and 
elevation sections to assess grade smoothing, assessment of element correlations in the blocks, as well as a global 
change of support to assess grade smoothing at various cut-off grades. Validation checks showed the model to be 
valid with an appropriate amount of grade smoothing. As an additional check, the model was externally reviewed 
by SRK Consulting. There were no material issues identified with the geological modelling, estimation, validation, or 
classification process.  

In the San Roberto zone, Measured resources were reinstated tightly around existing mine development and now 
total 359 kt of material with an average grade of 1.69% Cu above a US$ NSR 35/t cut-off. The existing Indicated 
resource limit was expanded to accommodate the new down-dip drilling in the western part of San Roberto. This 
added approximately 430 kt of material with an average NSR value of US$ 95/t, above a US$ 35/t NSR cut-off. An 
additional 168 kt was also gained from the updated geological interpretation of the MNV structure and associated 
hangingwall veins. In other parts of the San Roberto zone, the Indicated classification boundary was tightened 
around drillholes that represented limits of drilling exceeding approximately 60 m. This represents approximately 
745 kt of material with an average undiluted NSR value of US$ 63/t, above a US$ 35/t NSR cut-off, that was moved 
into the Inferred category. The net change to Measured and Indicated resources in 2016 was a 3% decrease in 
tonnage, but the grades increased by 12% for copper, 5% for silver, 18% for zinc, and 6% for lead.  

Subsequent  to  the  June  2016  mineral  resource  update,  there  was  a  reduction  of  1,748  kt  of  Measured  and 
Indicated resources after taking into consideration the results of the December 2016 mineral reserves update 
(discussed below). The update showed that many of the remaining pillars and isolated unmined areas within the 
central part of the San Roberto zone exhibit very little chance of future economic extraction, hence they were 
removed from the resource base to keep mineral resource reporting in line with best practice standards.  

In the San Rafael zone, a conservative reinterpretation of the zone is being used until additional infill drilling is 
completed in 2017. The updated interpretation is thinner and excludes mineralization previously modelled as 
internal waste in the hangingwall due to uncertainty in the mineralization continuity. As a result, the tonnage in the 
Indicated category was reduced by 47%, but the grades increased by 7% for copper, 12% for silver, 34% for zinc, 
and 32% for lead. 

In the Mala Noche Footwall zone, approximately 400 kt of new Indicated resources were added as a result of 
exploration drilling and modelling, which equates to a 12% increase in tonnage. Copper and silver grades decreased 
by 9% and 5% respectively, while zinc and lead grades increased by 29% and 2% respectively. Zinc grades increased 
due to the inclusion of more zinc-rich material near the junction with the MNV structure. 

The updated Measured and Indicated Mineral Resources for the copper zones, after 2016 mining activities, total 
6,633 kt at 1.97% Cu (Table 3). Mining in 2016 consumed 720 kt of mineral resources at an average grade of 2.08% 
from the resource block model. 

Mineral  resources  for the San  Roberto,  MNFW, and San Rafael zones after taking into mine production until 
December 31, 2016 are summarized in Table 3 above a US$35 per tonne net smelter return (“NSR”) cut-off. Jeremy 
Vincent, P.Geo., Manager of Production and Development Geology at Capstone and a Qualified Person as defined 
by NI 43-101, is responsible for the mineral resource estimates for the San Roberto, MNFW, and San Rafael zones. 

34 

 
There has been no mining activity in the San Rafael zone. Mineral Resources are presented inclusive of mineral 
reserves. 

TABLE 3: COZAMIN MINE ESTIMATED MINERAL RESOURCES AS AT DECEMBER 31, 2016 

Zinc 
Metal 

(kt) 

Lead 
Metal 

(kt) 

Classification 

Tonnes  Copper 

Silver 

Zinc 

(kt) 

(%) 

(g/t) 

(%) 

Pb 

(%) 

Copper 
Metal 

(kt) 

Measured 

Indicated 
Measured + 
Indicated 
Inferred 

Measured 

Indicated 
Measured + 
Indicated 
Inferred 

Measured 

Indicated 
Measured + 
Indicated 
Inferred 

Measured 

Indicated 
Measured + 
Indicated 
Inferred 

Copper Zone – San Roberto 

359 

2,852 

1.69 

1.19 

3,211 

1.25 

4,535 

0.57 

60 

54 

54 

41 

1.17 

1.92 

1.84 

2.57 

0.28 

0.41 

0.40 

0.33 

6 

34 

40 

26 

Copper Zone – Mala Noche Footwall  

329 

3,093 

3,422 

5,087 

688 

5,945 

6,633 

9,622 

2.40 

2.68 

2.65 

1.71 

2.03 

1.97 

1.97 

1.17 

1,091 

0.30 

1,091 

0.30 

1,441 

0.20 

43 

54 

53 

37 

52 

54 

54 

39 

47 

47 

43 

0.63 

0.43 

0.45 

0.53 

0.03 

0.03 

0.03 

0.03 

Total – Copper Zones 

0.91 

1.14 

1.12 

1.49 

0.16 

0.21 

0.21 

0.17 

Zinc Zone – San Rafael 

4.47 

0.56 

4.47 

4.14 

0.56 

0.47 

8 

83 

91 

87 

14 

117 

131 

113 

3 

3 

3 

Silver 
Metal 

(koz) 

696 

4,911 

5,607 

6,038 

459 

5,393 

5,852 

5,979 

1,155 

10,304 

11,459 

4 

55 

59 

117 

2 

13 

15 

27 

6 

68 

74 

12,017 

144 

1,649 

1,649 

1,991 

49 

49 

60 

1 

12 

13 

15 

0 

1 

1 

2 

1 

13 

14 

16 

6 

6 

7 

NOTE: The Cozamin mineral resource estimate was completed by Jeremy Vincent, P.Geo., Manager of Production and Development Geology at Capstone, 
and a Qualified Person as defined by NI 43-101. The NSR formula used for the mineral resources was based on US$ 2.50/lb Cu, US$ 20/lb Ag, US$ 1.0/lb 
Zn, MEX 18.5 to USD 1.0, and metallurgical recoveries of 94.5% Cu, 72% Ag, 70% Zn. The resulting NSR formula is $42.426*%Cu + 0.364*Agppm + 
8.123*Zn%. Note that zero value is attributed to Pb because the circuit is expected to be used minimally due to low Pb concentrations. San Rafael 2014 
NSR formulae are based on independent processing of San Rafael ore with head grades above or below a 0.50% Cu threshold. The metal prices for Cu, Ag, 
Zn, and Pb respectively are as follows: Cu = US$ 2.50/lb, Ag = US$ 20.00/oz, Zn = US$ 0.80/lb, Pb = US$0.85/lb. The following recoveries were used: ≤0.5% 
Cu head grade: Cu = 57%, Ag = 51%, Zn = 75%, Pb = 58%; >0.5% Cu head grade: Cu = 57%, Ag = 61%, Zn = 79%, Pb = 54% (≤0.50% Cu head grade: Cu*0.00 
+ Ag*0.107 + Zn*7.802 + Pb*6.628, >0.50% Cu head grade: Cu*25.917 + Ag*0.299 + Zn*7.436 + Pb*5.031). Mineral resources are presented inclusive of 
mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Figures may not sum due to rounding.. 

In December 2016, Diego Airo, P.Eng., Senior Mining Engineer at Capstone and a Qualified Person as defined by NI 
43-101, updated the Mala Noche Vein and Mala Noche Footwall Zone mineral reserve model using the updated 
mineral resource model completed by Jeremy Vincent, P.Geo. The mineral reserve estimate was generated using 
Maptek  Vulcan  Mine  Stope  Optimizer  software,  which  was  operated  using  the  following  base  assumptions: 
US$2.50/lb copper, US$ 20/oz Ag, US$ 1.0/lb Zn, minimum mining width of 2.0 m (internal dilution), external 
dilution of 0.5 m in the hanging wall and 0.5 m in the footwall, 48 degree minimum stope walls, stopes generated in 
5 m step sizes along strike, stope heights varying between 12-15 m high, development heights of 4.5 m high and 
4.0 m wide, and an NSR cut-off value of US$ 42.00/t. Results from the Mine Stope Optimizer were reviewed in 
detail to ensure all stopes were in non-mined out areas and that isolated stope blocks had sufficient economic 

35 

 
 
 
 
 
 
 
 
 
 
value to cover operating and capital costs of extracting those areas. All planned sill pillars that will not be mined 
due to geotechnical considerations were removed from the reserve. In the Mala Noche Vein, a short term model 
built with channel samples was used to validate the final stopes generated using the resource model, resulting in 
some  areas  being  removed  from  the  reserves  where  the  short  term  model  indicated  lower  grades  than  the 
resource model. All sill pillars and mining remnants existing in the previous MNV reserve were also removed from 
the estimate, as it was deemed all of those areas were no longer economic due to the small size and high capital 
costs to access. The final triangulations were reported separately as stopes and development as additional dilution 
was included to account for the development drifts and slashing, as well as an additional 5% ore loss for mine 
extraction  and  unforeseen  geotechnical  conditions.  As  the  mine  and  reserves  are  getting  deeper,  additional 
geotechnical studies need to be conducted to improve confidence in the mining methodology proposed. This work 
is  scheduled  for  2017  and  includes  geotechnical  bore  hole  logging  and  laboratory  testing,  in-situ  stress 
measurements and updated geotechnical assessments.  

The new proven and probable reserves, discounted for mine production to December 31, 2016, containing 4,320 kt 
at 1.74% Cu (fully diluted and recovered) are detailed in the table below. 

TABLE 4: COZAMIN MINE ESTIMATED MINERAL RESERVES AS AT DECEMBER 31, 2016 

Classification 

Tonnes 

Copper 

Silver 

Zinc 

(kt) 

(%) 

(g/t) 

(%) 

Pb 

(%) 

Copper 
Metal 

(kt) 

Proven 

Probable 
Proven + 
Probable 

Proven 

Probable 
Proven + 
Probable 

Proven 

Probable 
Proven + 
Probable 

Copper Zone – San Roberto 

133 

1,452 

1.42 

0.98 

1,585 

1.02 

56 

44 

45 

0.86 

1.30 

0.31 

0.36 

1.27 

0.36 

2 

14 

16 

134 

2,601 

2,735 

267 

4,053 

4,320 

1.80 

2.18 

2.16 

1.61 

1.75 

1.74 

Copper Zone – Mala Noche Footwall 

33 

45 

44 

44 

44 

44 

0.61 

0.29 

0.03 

0.02 

0.30 

0.02 

Total – Copper Zones 

0.73 

0.65 

0.17 

0.14 

0.66 

0.14 

2 

57 

59 

4 

71 

75 

Silver 
Metal 

(koz) 

238 

2,075 

2,313 

142 

3,722 

3,865 

380 

5,798 

6,178 

Zinc 
Metal 

(kt) 

Lead Metal 

(kt) 

1 

19 

20 

1 

7 

8 

2 

26 

28 

0 

5 

6 

0 

1 

1 

0 

6 

6 

NOTE: Diego Airo, P.Eng, Senior Mining Engineer at Capstone Mining Corp. is the Qualified Person for the Cozamin mineral reserve estimates. Disclosure of the 
Cozamin Mine mineral reserves as of December 31, 2016 was completed using fully diluted mineable stope shapes generated by the Maptek Vulcan Mine 
Stope Optimizer software and calculated on the 2016 resource block models created by J. Vincent, P.Geo., of Capstone Mining Corp. The reserves are based on 
a Net Smelter Return (NSR) cut-off of US $42/tonne. The NSR formula used for the reserves was based US$ 2.50/lb Cu, US$ 20/lb Ag, US$ 1.0/lb Zn, MEX 18.5 
to USD 1.0, and metallurgical recoveries of 94.5% Cu, 72% Ag, 70% Zn. The resulting NSR formula is $42.425*%Cu + 0.364*Agppm + 8.123*Zn%. Note that 
zero value is attributed to Pb because the circuit is expected to be used minimally due to low Pb concentrations. Tonnage and grade estimates include dilution 
and recovery allowances. Figures may not sum due to rounding.  

The new reserves resulted in a reduction, after accounting for depletion, of 2,059 kt, which amounts to a 29% 
decrease in tonnage and 18% contained copper versus the year end 2015 reserves. Approximately 40% of this 
reduction is a result of removing historic pillars and small mining remnants from the San Roberto reserve, 30% is 
due to using the Mine Stope Optimizer software in the MNFWZ which removed reserve stopes in very narrow veins 
and the remaining reduction is due to individual evaluation of isolated or complex stoping blocks, using simplified 
cashflow analyses, channel sample models or review of geology and access. This change represents an approximate 
15% reduction in Cozamin’s NPV.  

36 

 
A high level sensitivity test was conducted as part of the reserve update, which consisted of varying metal prices 
and operating costs +/- 20% in the Mine Stope optimizer, resulting in 4 additional cases. The results showed 
fluctuations of tonnage in the range of 13% to 16% and contained copper of 6 to 8% in tonnage. A secondary 
sensitivity test was conducted on all of the stope shapes as designed at $2.50/lb Cu (base case), evaluating the 
distribution of Net Smelter Return. The test indicated that over 80% of the stopes have an NSR above US$ 60/tonne 
(base cut off is US$ 42/tonne). Both of these tests indicate that the Cozamin reserve is robust and not highly 
sensitive to +/- 20% fluctuations in key parameters. 

Mining Operations 

The Cozamin Mine is an underground mining operation that commenced in 2006. Ore is extracted primarily using 
long-hole open stoping. The mine extends for a strike length of over 1 km and mineral reserves extend to a depth 
of 1,000 m. Access to the underground workings is via two service and haulage ramps and a hoisting shaft. 

Run-of-mine ore is stockpiled on surface and sent to the crushing plant. The crushed ore is stored in two ore bins 
that feed parallel conventional grinding circuits. The resulting product is sent to the copper-lead rougher flotation 
where a copper- lead concentrate is produced. The tailings report to zinc conditioning tanks prior to zinc flotation, 
where reagents are added to activate zinc mineralization. The tailings go through zinc rougher and cleaning circuits 
to  product  a  zinc  concentrate.  Separate  copper  and  lead  concentrates  are  produced  from  the  copper-lead 
concentrate via selective flotation. The concentrates are thickened and filtered to produce product suitable for 
transport. The concentrates are trucked to Manzanillo, Colima, Mexico. The current mine plans maintain the 
Cozamin Mine operations life to 2020. We are currently evaluating the financial viability of blending zinc-rich 
mineralization from the San Rafael zone with the copper-rich mineralization from the San Roberto and Mala Noche 
Footwall zones. 

All necessary permits to conduct mining work on the property have been obtained. There are no known factors or 
risks that affect access, title or the ability to conduct mining. Environmental liabilities and issues are limited to 
those  that  are  expected  to  be  associated  with  an  underground  base  metal  operation.  These  include  an 
underground mine, associated infrastructure, access roads and surface infrastructure including the process plant, 
waste and tailings disposal facilities situation within the area of disturbance. 

The Cozamin Mine’s applicable taxes include the following: 

•  Corporate  Taxes  -  the  Mexican  corporate  income  tax  is  at  a  30%  rate  applied  on  net  income  after 
depreciation. The 2013 Mexican Tax Reform repealed the 17.5% IETU Tax (Impuesto Empresarial Tasa 
Única) effective for Cozamin’s 2014 taxation year. 

•  A value added tax is payable to the Mexican government. The amount paid in any given year is 100% 

refundable, and may be used to offset income tax. 

•  The 2013 Mexican Tax Reform introduced a 7.5% mining tax. The mining tax, effective January 1, 2014, is 
applied on the positive difference between income arising from sales related to mining and the deductions 
permitted by the Income Tax Law, not including deductions on investments (except those involved in 
mining prospecting and exploration), interest payable and the annual inflation adjustment. The Tax Reform 
also introduced a 0.5% mining tax on precious metals that is applied on gross taxable revenues. 

•  Property taxes are approximately $20,000 per year. 
•  The  State  of  Zacatecas  introduced  taxes  effective  January  1,  2017  for  purposes  of  reducing  the 
environmental impact created by industrial activities carried out in the state. These new taxes consist of 
the (i) Environmental Remediation Tax on the Extraction of Materials, (ii) Tax on Gas Emissions to the 
Atmosphere, (iii) Tax on Emissions of Pollutants to the Soil, Subsoil, and Water, and (iv) Tax on the Disposal 
of Wastes. Cozamin is assessing the impact of these new taxes that are applicable for the 2017 taxation 
year, including whether the state has the legal constitutional right to levy such taxes and we have filed a 
challenge on constitutional grounds. 

37 

 
Exploration and Development 

The 2017 planned exploration program includes a proposed 23,275 meters of underground infill and step-out 
exploration drilling on the Mala Noche Footwall mineral resource area. Surface drilling is also planned in 2017 and 
includes a total of 7,730 meters of infill drilling at the San Rafael Deposit. 

Minto Mine (Yukon) 

The Minto Mine is the subject of a report titled “Minto Phase VI Preliminary Feasibility Study Technical Report” 
dated July 31, 2012 with an effective date of January 1, 2012 (the “Minto Report”). This technical report was 
compiled by Minto Explorations Ltd. (“MintoEx”) and written by Brad Mercer, P.Geo.; Wayne Barnett, P.Eng.; John 
Eggert, P.Eng.; Bill Hodgson, P.Eng.; Garth Kirkham, P.Geo.; Mike Levy, PE; Pooya Mohseni, P.Eng.; Bruce Murphy, 
P.Eng.; and Colleen Roche, P.Eng., each a Qualified Person as defined by NI 43-101. The description of the Minto 
Mine in this document is based on assumptions, qualifications and procedures which are set out only in the full 
Minto Report. Reference should be made to the full text of this report, which is available in its entirety on SEDAR at 
www.sedar.com under Capstone’s profile. 

All scientific and technical information in this summary relating to any updates to the Minto Mine since the date of 
the  Minto  Report  has  been  reviewed  and  approved by  Qualified  Persons  who  supervised the  preparation  of 
updates to elements of the Minto Report. 

Project Description and Location 

The Minto Mine is a 3,850 tpd operating copper mine located in central Yukon, located approximately 240 km 
northwest of Whitehorse, Yukon’s capital. The project is roughly centred on NAD 83, UTM Zone 8 coordinates 
6,945,000 mN, 385,000 mE. The mine is located on the west side of the Yukon River on Selkirk First Nation (“SFN”) 
Category A settlement land (SFN Parcel R-6A). There are no back-in rights, payments or other agreements or 
encumbrances to which the property is subject other than a Cooperation Agreement with the SFN and a NSR 
payable to the SFN. 

The project consists of 164 quartz claims covering an area of approximately 2,760 ha that are 100% owned by 
Minto Explorations Ltd., a 100% owned subsidiary of Capstone. The claims have expiry dates ranging between 
March 1, 2017 and October 7, 2028. The leases, but not the claim boundaries, have been surveyed by an authorized 
Canada Lands Surveyor in accordance with instructions from the Surveyor General. 

Environmental liabilities at the Minto Mine relate to the dry stacked tailings facility and waste rock dumps as well 
as  some  water  stored  at  the  site  that  is  impacted  by  operations  and  to  the  removal  of  all  operational 
infrastructures. A closure plan has been developed and approved (most recently on December 2014) detailing 
methods and costs associated with restoring the site to an acceptable environmental standard. Engineered covers 
will be placed on tailings and waste rock such that interactions with surface water are prevented. A C$72.1M surety 
bond has been put in place with the Yukon Government in accordance with a territorial closure and reclamation 
policy. The closure plan and related letter of credit amount are reviewed on a bi-annual basis. The latest bi-annual 
closure plan update was submitted in August 2016 and is currently under review.  

MintoEx has obtained a variety of permits in order to conduct ongoing work on site. The major instruments or 
authorizations permitting and governing operations for the project include a Type A Water Use Licence, issued by 
the  Yukon  Water  Board  and  a  Quartz  Mining  Licence  issued  by  the  Yukon  Government,  Energy  Mines  and 
Resources. MintoEx has all permits necessary to extract ore from currently planned mining areas, to maintain plant 
throughput, deposit in waste and tailings management facilities and conduct other environmental aspects of the 
project.  Figure 3 illustrates the location of Minto infrastructure in relation to the open pit and underground 
mineral resources and reserves. 

38 

 
 
FIGURE 3: MINTO INFRASTRUCTURE AND LOCATION OF MINERAL RESOURCES AND MINERAL RESERVES 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

The Minto Mine is accessible via the Klondike Highway (No. 2) to Minto Landing on the east side of the Yukon River. 
At Minto Landing, the mine operates a barge across the river in the summer months and constructs an ice bridge in 
the winter. The barge has the capacity to carry one B-train transport trailer and truck. There is typically a 6 to 8-
week period during each break-up and freeze-up of the Yukon River when there is no access across the river. A 27 
km long, all-weather gravel road provides access from the West side of the Yukon River to the project site. 

The mine access road crosses one major tributary of the Yukon River, Big Creek, via a single-lane steel span bridge 
made with reinforced concrete abutments and deck. The highway, river crossing and gravel mine access road are 
suitable for heavy transport traffic. During the river freeze and thaw periods, personnel are transported from 
Whitehorse via charter air services that land on the 1,300 m-long airstrip located at the mine. 

The climate in the Minto area of the Yukon is considered sub-arctic with short cool summers and long cold winters. 
The average temperature in the summer is 10°C and the average temperature in the winter is -20°C. Average 
precipitation is approximately 25 cm of rain equivalent per annum in the form of rain and snow. The weather does 
not  impede  year  round  operation  of  the  mine  and  processing  plant  except  in  short  periods  of  harsh  cold 
temperatures (-48°C) that can cause open pit mining operations to be temporarily suspended. 

39 

 
 
The property lies in the Dawson Range, part of the Klondike Plateau, an uplifted surface that has been dissected by 
erosion. Local topography consists of rounded rolling hills and ridges and broad valleys. The highest elevation on 
the property is approximately 1,000 masl, compared to elevations of 460 m along the Yukon River. Slopes on the 
property are relatively gentle and do not present accessibility problems. Bedrock outcrops can often be found at 
the tops of hills and ridges. There are no risks of avalanche on the property. 

Vegetation  in  the  area  is  sub-Arctic  boreal  forest  made  up  of  largely  spruce  and  poplar  trees.  The  area  has 
experienced several wildfires over the years, the latest in 2010, and has no old-growth trees remaining. The fire in 
2010 led to the partial evacuation of the camp and a short stoppage in production. 

The nearest services, including fuel, groceries, hotel, restaurant and medical clinic, are at Carmacks, approximately 
75 km south of Minto on Highway 2. Some services are available at Pelly Crossing, 35 km to the East of Minto. The 
nearest large community is Whitehorse, with a population of approximately 28,000. It is serviced with commercial 
flights daily from Vancouver, Edmonton and other northern communities. Whitehorse is also connected via paved 
highways to British Columbia to the South, to Alaska to the West and to the port of Skagway to the Southwest, 
where Minto concentrate is trucked for loading onto ocean-going vessels. 

The Minto Mine has sufficient power, water, camp and personnel to continue operations through the life of mine 
plan. 

History 

In 1970, a joint venture between Consolidated Silver Standard (formerly Silver Standard Mines Ltd.) and Asarco Inc. 
conducted a regional stream sediment geochemical survey in the area. In 1971, the DEF claims were staked by 
United Keno Explorations. That same year a joint venture formed with United Keno Hill Mines, Falconbridge Nickel 
and Canadian Superior Explorations, to cover follow-up prospecting. Induced polarization (“IP”) and very-long-
frequency-electromagnetic (“VLF-EM”) geophysical surveys, soil sampling and mapping on the DEF claims followed. 
In June 1973, a main mineralized body was discovered. There are no detailed descriptions of historical sampling 
methods, preparation, or analysis by Asarco, and there is no useable core from this period. In 1974, a winter road 
was built from Yukon Crossing and 58 diamond drillholes (11,228 m) on the Minto claims were drilled. From 1975-
1976 joint Feasibility studies were conducted. 

In 1984, Consolidated Silver Standard transferred its interest in the Minto claims to Western Copper Holdings, a 
subsidiary of Teck Corp. In 1989, Western Copper Holdings transferred its interest in the Minto claims to Teck Corp. 
In 1993, MintoEx was formed. Asarco and Teck sold their interest in the Minto claims (and leases) for shares in 
MintoEx and provided $375,000 in working capital. Asarco and Teck also received a net smelter royalty of 1.5% to 
be divided evenly. In that same year, Falconbridge, the parent of United Keno Hill, sold its interest in the DEF claims 
to MintoEx. Falconbridge was granted an option to repurchase the DEF claims on January 1, 2005 if the deposit was 
not in production by then. An initial public offering of shares of MintoEx was completed in 1994. There were 
5,912,501  shares  issued  and  outstanding  with  Asarco  being  the  majority  shareholder  with  3,297,500  shares 
(55.8%). 

In 1996, funding was arranged with Asarco to bring the deposit into production whereby Asarco would provide up 
to $25M. Under the funding arrangement, Asarco would acquire a 70% interest in the project, MintoEx would 
retain a 30% interest and remain as operator. That same year, MintoEx made the $1M payment to Falconbridge for 
the DEF claims completing the consolidation of the Minto and DEF claims. Also in that year, a 16 km access road 
was constructed including a barge landing site on the West side of the Yukon River and a bridge over Big Creek. A 
further 12.8 km of road construction in 1997 was done to complete the new access road. Also in 1997, a co-
operation agreement was signed with the SFN. In 1999, a production licence was received. 

From 1973 to 2001, most of the drill core samples were split using a mechanical wheel core splitter (in contrast to a 
diamond saw). In the case of two holes drilled in 1993 for metallurgical grinding testing, the entire core through the 
mineralized interval was utilized to improve the validity and reliability of the metallurgical tests. Quality control 

40 

 
procedures  used  during  the  1973  to  2001  drill  programs  are  not  known,  with  the  exception  of  10  samples 
submitted for umpire analysis in 1994. 

In 2001, most of the Asarco core and all of the Falconbridge core was destroyed by time and forest fire. A limited 
amount of the old Asarco core that could be recovered was re-sampled in 2002. In June 2005, Sherwood acquired 
the Minto property. In 2006, mill construction commenced. A C$85M debt package was arranged, forward sales 
completed, and concentrate off-take agreement executed in October 2006. In 2007, a Power Purchase Agreement 
for Minto was signed. That same year, the first copper-gold concentrates at Minto Mine were produced and a 
resource estimate for the Area 2 deposit was completed. First concentrates from the Minto Mine were delivered to 
the Port of Skagway, Alaska in July 2007. The Minto Mine declared commercial production and the first Minto 
concentrates  shipped  from  Skagway  in  October  2007.  In  2008,  Capstone  acquired  all  outstanding  shares  of 
Sherwood. 

Geological Setting 

The Minto Mine is found in the North-Northwest trending Carmacks Copper Belt along the eastern margin of the 
Yukon- Tanana Composite Terrain. The Belt is host to several intrusion-related Cu-Au mineralized hydrothermal 
systems. The  Minto  Property  and  surrounding  area are  underlain  by  plutonic  rocks  of  the  Granite  Mountain 
Batholith (the “Batholith”) of the Early Mesozoic Age. The component of the Batholith represented on the Minto 
Property is the Early Jurassic Age Minto pluton and is predominantly of granodiorite composition. Other rock types, 
albeit volumetrically insignificant, include thin dykes (typically less than 1 m in thickness) of simple quartz-feldspar 
pegmatite, aplite, and an aphanitic- textured intermediate composition rock. 

For ease of reference the Minto copper-gold-silver system is divided into seven mineralized areas within the Minto 
deposit; from North to South they are: Minto North; Minto North 2 (formerly Inferno North); Minto Main; Minto 
East; Minto East 2; Minto South (MSD-a consolidation of Area 2, Copper Keel, Area 118 and Wildfire deposits that 
are now considered one continuous deposit); and Ridgetop. In 2014, we renamed the Fireweed zone to Minto East 
2 to reflect the continuity of mineralization between these zones. Each of these deposits closely share a similar 
style  of  mineralization  hosted  by  vertically  stacked,  shallow  dipping  deformation  zones  within  the  intrusion. 
Remnants of the Main deposit are currently exposed in an exhausted open pit mine and this geometry has been 
confirmed, with a similar geometry exposed in the exhausted Area 2 open pit. The other deposits have drill-
delineated mineral resources and/or reserves but mineralization is not exposed at the surface. These deposits and 
other mineral prospects define a general north-northwest trend informally called the Priority Exploration Corridor 
(PEC). 

Copper sulphide mineralization is found in the rocks that have a structurally imposed fabric, ranging from a weak 
foliation  through  to  a  strongly  developed  gneissic  banding.  The  contact  relationship  between  the  foliated 
deformation zones and the massive phases of granodiorite is generally very sharp. These contacts do not exhibit 
chilled margins and are considered by MintoEx geologists to be structural in nature, separating the variably strained 
equivalents of the same or similar rock type. 

The more highly strained deformation zones form sub-horizontal horizons and can be traced laterally for more than 
1,000 m in the drill core. They are often stacked in parallel to sub-parallel sequences and it is postulated that the 
foliated granodiorite horizons represent healed, shallowly dipping shear zones within the Batholith; theorized to 
have  formed  when  the  rocks  passed  through  the  brittle/ductile  transformation  zone  in  the  earth’s  crust  in 
transition from a deep emplacement environment of the Batholith to eventual exhumation. There is on-going 
debate, however, regarding the stratigraphic, intrusive, or structural nature of the zones hosting the foliation and 
mineralization.  MintoEx  engaged  the  Mineral  Deposits  Research  Unit  (“MDRU”)  of  the  University  of  British 
Columbia to help understand the mineral paragenesis and deformation history. No other recognized deposit type 
compares directly with Minto mineralization. While an IOCG style for the Minto Deposit cannot be unequivocally 
demonstrated, the authors are of the opinion that this style of deposit provides the most consistent model for the 
current level of understanding. 

41 

 
Exploration 

Mineral exploration on the Minto property has been conducted intermittently since 1971. Subsequent to the 
discovery of the Minto Main deposit, which has been mined out, the adjacent southern half of the property has 
undergone systematic brownfield exploration. Exploration on the northern half is more sporadic. 

The exploration approach by MintoEx has been the systematic evaluation of modern electrical (chargeability); 
geophysical methods by commissioning various “proof-of-concept” surveys over known mineralization and then 
expanding  survey  coverage  outward  into  untested  areas  using  these  methods  that  are  calibrated  to  known 
deposits. The predominant electrical geophysical methods used are Gradient Array Induced Potential (“GAIP”), 
Dipole-Dipole Induced Potential, and Titan-24 DC Induced Potential. Drill targeting has been predominantly based 
upon the coincidence of an anomaly in one of the electrical (chargeability) methods with an anomaly in the 1993 
total field airborne magnetic survey (“MAG”).  

GAIP surveys were conducted in 2006 and 2007 with a combined total of 171 line kilometres. Both surveys were 
conducted by Aurora Geosciences of Whitehorse, Yukon. The GAIP method proved a successful exploration tool for 
locating near- surface mineralization when combined with magnetics; the most notable discovery attributed to this 
being Minto North. 

A modified pole-dipole geophysical survey was conducted in 2009 over areas west and north of the DEF fault. The 
survey targeted areas of known historical geophysical anomalies, as well as overlapping GAIP coverage where 
permafrost or deep overburden ground conditions returned poor results. A total of 20.6 line kilometres were 
completed by Aurora Geosciences. The results of the survey indicated two separate anomalies, one approximately 
1,000m due west of Minto North, and the second approximately 2,400m due north of Minto North. Drill testing 
results for each anomaly were enigmatic in that no significant copper-gold mineralization was encountered despite 
the intersection of multiple, thick sequences of foliated favorable host rock. 

Three separate mise-a-la-masse drillhole IP surveys were completed in 2009, 2010, and 2011, with all three surveys 
being completed by Aurora Geosciences. The results of the surveys were useful in vectoring step-out drilling at 
Copper Keel NE and at Inferno. 

Another new exploration tool implemented in 2009 included the completion of the deep penetrating Titan-24 
geophysical survey of the Minto PEC from July 29 to August 8, 2009. The survey included three double spread direct 
current resistivity/induced polarization (“DC/IP”) and magnetotelluric (“MT”) lines totaling 21 line kilometres. An 
expanded Titan- 24 DC/IP survey covering about 85% of the property was completed from May 19 to July 15, 2010. 
Titan-24 surveying for both 2009 and 2010 programs were conducted by Quantec Geoscience of Toronto, Ontario. 

The 2009 Titan-24 survey showed a coincidence of significant copper sulphide mineralization of known deposits 
with chargeability anomalies as well as several previously unknown deep anomalies. The most attractive deep 
targets were located south of Ridgetop, flanking the Minto Main Pit (west, southeast, northwest, and northeast), 
and flanking the Minto North deposit (east, west, and north). The survey also identified a near surface target 
southwest of Ridgetop. MT results indicated steeply dipping fault-like structures with an estimated 70⁰ dip to the 
north, the most prominent being the DEF fault. Preliminary drill testing of the Titan-24 targets spanned from 
September 4 to October 17, 2009. Results of the drilling were variable returning promising copper mineralization 
intersections in 9 drill holes at Ridgetop Southwest and significant copper-gold mineralization in 2 holes southeast 
of Minto Pit (Minto East Discovery); however, in 9 holes at 8 other separate targets no significant copper-gold 
mineralization was encountered. 

Similar to the 2009 Titan-24 survey, the expanded 2010 survey identified previously unknown moderate to deep 
anomalies; the most attractive new targets were located east of the Copper Keel trend (Wildfire), at Copper Keel 
NE, southwest of Ridgetop, at Airstrip SW, and northeast of the Minto airstrip. Drill testing of the 2010 Titan-24 
chargeability  targets  spanned  from  June  25  to  November  5,  2010.  Further  testing  of  select  Titan-24  targets 
continued throughout the 2011 drilling campaign. Results of the 2010 drilling were variable returning significant 

42 

 
copper mineralization in more than 70 drillholes east of the Copper Keel trend (Wildfire discovery), and in 4 holes 
northeast of the Minto Pit (Inferno discovery). Promising copper-gold mineralization was observed in 3 holes 
southwest of Area  118,  4 holes at  Copper Keel NE, and in 1 hole at Ridgetop NE. No significant results were 
encountered  in  5  holes  at  three  other  separate  targets.  Results  of  the  2011  drilling  were  variable  returning 
significant copper mineralization in more than 70 drillholes at Copper Keel NE and 26 holes at the Minto East 2 
Discovery.  Similar  to  2010,  some  of  the  2011  tested  targets  did  not  encounter  significant  copper-gold 
mineralization despite the intersection of multiple, thick sequences of foliated favorable host rock. 

Future exploration  programs  will  be more reliant solely on electrical/chargeability methods targeting deeper 
mineralization as the near-surface potential and discrete magnetic bull’s-eyes have largely been targeted. MintoEx 
sees good exploration potential in the area north of the DEF fault, as evidenced by the discovery of the high grade 
Minto North deposit early in 2009, the Minto North 2 prospect in late 2010, and the Minto North 2 deposit in 2012. 
Magnetic data in areas located north of Minto North plus areas West and East respectively of the PEC may still be 
useful as these regions are still relatively under explored. 

In 2009, several other historic bedrock copper occurrences discovered in the 1970’s North of the DEF fault were 
relocated and confirmed. In addition, various copper-in-soil geochemical anomalies, often coincident with magnetic 
geophysical anomalies, occur throughout the property and many of them remain untested. However, further 
understanding of the bedrock geology north of the DEF fault is required before many of these targets can be 
properly assessed and placed in perspective. No exploration has been undertaken since 2012. 

Mineralization 

The primary hypogene sulphide mineralization consists of chalcopyrite, bornite, euhedral chalcocite, and minor 
pyrite. Metallurgical testing also indicates the presence of covellite, although this sulphide species has never been 
positively  logged  macroscopically.  Texturally,  sulphide  minerals  predominantly  occur  as  disseminations  and 
foliaform stringers along foliation planes in the deformed granodiorite (i.e. sulphide stringers tend to follow the 
foliation planes). Occasionally, coarse free gold is observed associated with chloritic or epidote lined fractures that 
crosscut  the  sulphide  mineralization.  Sulphide  mineralization  is  always  accompanied  by  variable  amounts  of 
magnetite mineralization and biotite alteration. While these minerals occur in the non-deformed rocks they are 
present  in  the  mineralized  horizons  in  a  much  greater  abundance  in  an  order  of  magnitude  greater  than 
background. 

Massive mineralization occurs locally over intervals exceeding 0.5 m in thickness and semi-massive mineralization 
over several metres in thickness may occur. In these sulphide rich areas, textures often resemble those seen in 
magmatic sulphide zones with sulphide mineralization interstitial to the rock forming silicate minerals. The higher 
grade portion of the Minto Main deposits roughly corresponds to the bornite zone where locally concentrations of 
bornite up to 8% by volume are seen. The precious metal grades are elevated in the bornite zone (very fine gold 
and electrum occur  as  inclusions  in  bornite) and occurrences of coarse grained native gold are noted almost 
exclusively in bornite-rich material. The chalcopyrite zone is characterized by the metallic mineral assemblage of 
chalcopyrite-pyrite  +/-  very  minor  bornite  and  magnetite.  Empirical  observations  indicate  the  highest 
concentrations  of  bornite  are  associated  with  coarse  grained,  disseminated  and  stringer-style  magnetite 
mineralization, up to 20% by volume locally. 

Pervasive, strong potassic alteration occurs within the flat lying zones of mineralization, and is the predominant 
alteration assemblage observed in all of the Minto deposits. The potassic alteration assemblage is characterized by 
elevated biotite contents and minor secondary potassium-feldspar overgrowth on plagioclase relative to the more 
massive textured country rock. Additional alteration includes the replacement of mafic minerals by secondary 
chlorite, epidote, or sericite observed both in mineralized and waste rock interstitially or fracture/vein proximal, as 
well  as  variable  degrees  of  hematization  of  feldspars.  Minor  carbonate  overprint  is  occasionally  observed 
associated with secondary biotite. Silicification is present but not pervasive in the Minto deposits. 

43 

 
The Minto North, Minto East, and Minto East 2 Deposits exhibit a zoning from West to East. High-grade bornite-
dominant mineralization is observed in the West with lower grade chalcopyrite-dominant mineralization in the 
East. Bornite mineralization occurs as strong disseminations and foliaform stringers locally >10% to occasional 
semi-massive to massive lenses up to 2 m in thickness. Mineralization at the Area 2/118/Copper Keel regions of the 
Minto South Deposit and at Minto North 2 is distinct in that mineralization is predominantly disseminated (plus 
occasional foliaform stringers) and the semi-massive to massive sulphide mineralization is absent; as a whole the 
mineralization is more homogeneous and consistent as compared to Minto North or Minto Main. Mineralization at 
both Ridgetop and the Wildfire region of Minto South are subdivided into the near surface horizons that have been 
affected  by  supergene  oxidation  and  the  more  typical  primary  sulphide  mineralization  of  the  deeper  zones. 
Chalcopyrite  is  the  dominant  sulphide  in  the  lower  zones,  and  bornite  is  only  observed  in  minor  amounts. 
Texturally, chalcopyrite occurs as disseminations and foliaform stringers, and is rarely observed as semi-massive to 
massive bands. Magnetite is coarse grained, disseminated, stringer-style, and can occur in bands up to 0.3 m in 
thickness, up to 20% volume locally. 

Supergene mineralization occurs proximal to near-surface extension of the primary mineralization and beneath the 
Cretaceous conglomerate. Chalcocite is the prime mineral in these horizons along with secondary malachite, minor 
azurite and minor native copper. Observations of foliated and even copper mineralized cobbles in drilling indicate 
that “Minto-type” mineralization was exposed, eroded and reincorporated in conglomerate sedimentary deposits 
by the Cretaceous Age. 

Structural deformation includes the ore-bearing deformation zones, as well as folding present on the regional to 
micro- scale. Within the deformation zones the foliation exhibits highly variable orientations with the presence of 
small-scale (several centimetres in amplitude) folds. The ore-bearing zones are also occasionally folded on a scale of 
several hundred metres. The larger-scale folds appear to be gentle folds with North-South axial traces. Late brittle 
fracturing and faulting is noted throughout the property area; some of these faults have displacements significant 
enough to compartmentalize the deposits. 

Drilling 

There are currently more than 1,360 drillholes within a roughly 16 square kilometre area at Minto. Under the direct 
supervision of MintoEx mine geologists, MintoEx drilled a total of 1,145 m in 17 holes of NQ-diameter on the Minto 
property  at  Area  2  between  May  and  December  2016  and  a  sole  126 m  drillhole  at  Minto  North  using  the 
contractor, Driftwood Diamond Drilling Ltd., of Smithers, BC. MintoEx drilled a total of 115,054 m in 399 vertical 
and 37 angled, NQ and NTW-diameter, diamond drillholes at the Minto South Deposit from February 2006 to July 
2011, October 2014 to March 2015 and July to December 2016. The average drillhole length is 257 m. Drillhole 
spacing ranges between 30 m to 60 m at the Area 2 resource sub-domain, 40 m at the Area 118 resource sub-
domain, and 40 m to 60 m at the Wildfire and Copper Keel sub-domains. At Ridgetop, MintoEx drilled a total of 
16,850 m in 139 NQ-diameter, vertical drillholes and three angled diamond drillholes from May 2007 to September 
2009. The average length of the Ridgetop drillholes is 122.5 m. Drillhole collars are spaced between 20 m and 60 m 
apart. The mineralized zones dip moderately to the northeast. At Minto North, MintoEx drilled a total of 11,548 m 
in 71 vertical and 17 angled, NQ and NTW-diameter, diamond drillholes from January to October 2009. The average 
drillhole  length  is  130  m.  Drillhole  collars  are  spaced  between  15  m  and  20  m  apart.  Mineralized  zones  are 
shallowly dipping to the northwest. At Minto East, MintoEx drilled a total of 11,396 m in 13 vertical and 21 angled, 
NQ-diameter, diamond drillholes from April 2007 to August 2010 and in December 2015. The average drillhole 
length is 336 m, which are spaced approximately 40 m apart. Mineralized zones are shallowly dipping to the 
northwest. At Minto East 2, MintoEx drilled a total of 24,295 m in 13 vertical and 46 angled, NQ-diameter, diamond 
drillholes from 2011 to 2012. The average drillhole length is 412 m. Drillhole collars are spaced between 40 m and 
80 m apart. At Minto North 2, MintoEx drilled a total of 1,566 m in 9 vertical, NQ-diameter, diamond drillholes from 
March to April, 2012. The average drillhole length is 174 m. Drillhole collars are spaced from 40 to 80 m apart. The 
mineralized zone is sub-horizontal. 

44 

 
A review of drill hole spacing was conducted for various mineralization zones in 2014 and it was identified that in-
fill drilling was appropriate to reduce the drill spacing in some areas. The first area targeted was the planned 
pushback of the Area 2 pit (Area 2 Stage 3), with drilling conducted by Driftwood Diamond Drilling Ltd. in the fall of 
2014. Nineteen holes were drilled, for a total of 3,026 meters, reducing the drill spacing to an approximate 40 m 
grid pattern. The program continued in January 2015 with an additional four NQ and 2 angled HQ drillholes totalling 
959 meters in the Area 2 Stage 3 Area. The two angled holes were drilled for geotechnical assessment of potential 
pit wall stability.  Drilling  then  continued to mid-March 2015, targeting  gaps in drill  coverage in the Area 118 
underground area. Fourteen NQ holes, totalling 3,112 meters were completed in Area 118. Drilling was then put on 
hiatus until, lastly, one 369 meter drillhole for geo- mechanical assessment was drilled into Minto East during 
December 2015. 

Drillhole collar locations were initially located using a differential GPS unit, followed by survey using a Trimble G8 
GPS unit after completion of the drillhole. Since 2008, downhole survey measurements were taken primarily using a 
Reflex™ Flexit downhole survey tool. Although local magnetite concentrations sometimes prevented measurement 
of azimuth deviations, the tool provided overall readings that were realistic showing minor deviation in azimuth 
and dip. In 2010 a Reflex™ Maxibor II, which is not magnetically susceptible, was used in 22 drillholes in areas 
known  to  be  highly  magnetic.  Between  2008  and  2015  we  collected  magnetic  susceptibility  data,  but  we 
determined that high magnetic susceptibility does not imply the presence of mineralization, even though magnetic 
susceptibility is elevated in mineralized intervals. 

Mineralized intervals measured in the vertical drillholes are considered to be nearly true width because of the 
shallow- dipping nature of the mineralization. Drillcore is transported from the drill rig to the logging facility by the 
drilling contractor, where MintoEx personnel log it for geological, sampling, and geotechnical purposes. Geological 
data  including  lithology,  structure,  alteration,  and  mineralization  is  recorded  for  all  drillholes.  All  drillcore  is 
photographed. 

Sampling and Analysis 

Drill core samples are normally 1.5 m in length in foliated granodiorite (mineralized) and 3.0 m in length in the 
unfoliated  granodiorite  (waste)  rock.  The  geological  contact  between  these  units  is  generally  sharp  and  it  is 
respected  during  sampling.  Shoulder  samples  are  taken  in  the  waste  at  both  the  upper  and  lower  contacts, 
consisting of a 1.5 m and a 1.0 m sample. Unfoliated granodiorite units between mineralized units are completely 
sampled if they are 10 m in thickness or less between mineralized, foliated units, otherwise they are sampled at the 
geologist’s discretion. 

Our quality assurance protocols require certified reference materials, sample blanks, and duplicate samples to be 
regularly inserted into the sample stream. Our samples have generally been sent to the ALS Geochemistry (“ALS”) 
laboratory in Vancouver, but we have also used SGS Canada Inc. (“SGS”) for parts of our drilling programs. MintoEx 
inserted one each of a certified reference material, blank, coarse reject duplicate and pulp reject duplicate with 
every 16 core samples until 2014. In 2014, a field duplicate sample, the other half of the core, was added to the 
suite  of  control  samples  except  where  whole  core  is  required  for  metallurgical  or  geotechnical  testing.  The 
duplicate control samples are cycled between field duplicates, coarse reject duplicates and pulp reject duplicates 
within every batch of 20 samples including control samples. Umpire assaying of pulps at a secondary laboratory was 
conducted periodically, typically involving analysis of 0.5% or more of the core samples. Other quality control 
measures include random checks of drillhole collar locations using handheld GPS units and comparing entries in our 
database to original data sources. We consider our samples to be representative and we are not aware of any 
factors that may have resulted in sample biases. We do not know of any drilling, sampling, or recovery factors that 
could materially impact the accuracy or reliability of the drilling results. 

Bulk density measurements are taken in both mineralized and waste material. Since 2005, a weight-in-air-weight-
in-water method is used for bulk density determinations. In 2016, bulk density measurements were taken on whole 
sample intervals. From 2005-2015, measurements were taken at approximately every 1-3 m in mineralized zones, 

45 

 
every 5 m in poorly mineralized zones, and every 20-30 m in waste zones. Bulk density data obtained prior to 2005 
were not used in the resource estimations because the data was constructed by correlating bulk density to copper 
grade based upon too few actual measurements and because the core upon which this method was constructed 
was destroyed in forest fires and the methodology could not be audited. 

Security of Samples 

Exploration work by MintoEx was conducted using a quality assurance and quality control program generally 
meeting  industry  best  practices.  All  aspects  of  the  exploration  data  acquisition  and  management  including 
surveying, drilling, sampling, sample security, and assaying and database management were conducted under the 
supervision of appropriately qualified geologists and include written field procedures and verifications. 

Analytical control measures typically involve internal and external laboratory control measures to monitor the 
precision  and  accuracy  of  the  sampling,  preparation  and  assaying.  Insertion  of  certified  reference  material 
standards and blank material monitors the reliability of assaying results and is also important to prevent sample 
mix-up and monitor potential for cross contamination. Assaying protocols typically involve regular duplicate and 
replicate assays to monitor the reliability of assaying results throughout the sampling and assaying process. 

Several audits of our drillhole database were conducted by SRK and Garth Kirkham between 2005 and 2012, in 
addition to internal validations; significant errors were not found. 

Mineral Resource and Mineral Reserve Estimates 

The mineral resource estimates for the Minto South Deposit (“MSD”) and Ridgetop deposits were completed by Dr. 
Wayne Barnett, Ph.D., P.Geo., of SRK Consulting (Canada) Inc. (“SRK”), an independent Qualified Person as defined 
by NI 43-101. The effective date of the MSD resource estimate is May 31, 2015 and the effective date of the 
Ridgetop resource estimate is August 30, 2010. Marek Nowak, P.Eng., also of SRK, analysed the data, reviewed and 
validated the mineral resource estimates for MSD and Ridgetop. The MSD comprises the Area 2 (including the 
Copper Keel extension), Area 118, and Wildfire zones that form a part of the same system of mineralization. The 
most recent geological model in 2015 was created using Leapfrog Geo™ to update the foliated and non-foliated 
units, weathering horizons, and key fault structures offsetting the mineralization from the previous model created 
in GEMS™. Outlier samples were capped before compositing. Data were composited to 1.5 m lengths. Exploratory 
data  analysis  indicated  gold  and  copper  were  highly  correlated,  so  estimation  parameters  for  both  of  these 
elements were the same. Copper and gold were estimated by ordinary kriging into blocks measuring 10 m Easting 
by 10 m Northing by 3 m Elevation. Silver and bulk density were estimated using an inverse-distance-squared 
method.  Sample  search  ellipses  were  oriented  to  match  the  directions  of  the  modelled  geology.  Estimation 
validation included visual checks, comparison of average grades to assess global bias, and generation of swath plots 
to assess smoothing of blocks compared to the declustered, input, composite data. For the Ridgetop deposit, a very 
similar process outlined above was followed to model the geology and conduct the mineral resources estimate, 
although entirely within GEMS™. 

In 2016, mineral resource updates were undertaken for the P-Lens of the Area 2 deposit. This model supersedes 
the portion of the model representing the P-Lens of the Area 2 deposit completed in 2015 by SRK. The Area 2 P-
Lens block model was updated by Marek Nowak, P.Geo., of SRK using the updated geological solid provided by 
Minto  Geology.  Grades  were  re-estimated  using  the  same  parameters  used  in  the  June  2015  iteration.  The 
classification of Measured and Indicated Resources was revised slightly to take into account the 40 m drillhole 
spacing requirement  for  Indicated  Resources. Existing Measured resources were re-classified as Indicated, as 
drillholes in this zone are not close enough to warrant a Measured classification. 

The Minto East deposit was updated by Jeremy Vincent, P.Geo., Manager of Production and Development Geology, 
using the updated domain solid, modelled by Minto Ex. The new geological model provides a tighter confinement 
of the mineable mineralization, as obvious intervals of barren foliated granodiorite that run sub-parallel to the 
mineralization were excluded from the new interpretation. The updated interpretation is considered to better 

46 

 
represent what can be selectively underground mined at Minto. The Indicated classification boundary was adjusted 
slightly to take into consideration the 40 m drillhole spacing requirement.  

The motivation for the revision and re-estimation of these two underground deposits is based off experience 
gained from mining the Area 118 underground lens, which extracted approximately 25% fewer tonnes at 25% 
higher grade than predicted by the model. This showed that the underground mining method was more selective at 
extracting higher-grade material than predicted by the block model. A review of other underground deposits such 
as Minto East 2 and Copper Keel is planned in 2017. 

Garth Kirkham, P.Geo., FGC, an independent Qualified Person as defined by NI 43-101, is responsible for the Minto 
North, Minto East  2,  and Minto  North  2  resource  estimates.  The effective date of the Minto North resource 
estimate is December 1, 2009. Mining of this pit commenced in November 2015 and was completed in October 
2016. A total of 477 kt of Measured and Indicated resources remain after removal of resources sterilized by the 
open pit (60 kt at 2.67% Cu). 

The effective date of the Minto North 2 resource estimate is October 25, 2012. The Minto North 2 geology was 
modelled using cross-sectional interpretations taking into account lithology, copper grades and site knowledge. 
Samples were composited to 1.5 m lengths. Similar to the MSD and Ridgetop deposits, outlier samples were not 
top cut, but their influence was lessened by the use of restricted search distances above specified grade thresholds. 
Grades were estimated into blocks measuring 10 m Easting x 10 m Northing x 3 m Elevation using ordinary kriging, 
while bulk density was estimated using inverse distance squared. Search ellipses were oriented to match the 
directions of the modelled geology. Estimation validation included visual checks, comparison of average grades to 
assess global bias, and generation of swath plots to assess smoothing of blocks compared to the de-clustered, 
input, composite data.  

The  effective  date  of  the  Minto  East  2  resource  estimates  is  May  1,  2015.  The  Minto  East  2  deposit  is  an 
underground target, located approximately 300 m below the surface. In 2015, the 100, 300, 500, 700, 800, and 900 
zones in Minto East 2 were re-modelled using Leapfrog Geo™. Samples were composited to 2.5 m lengths to align 
with the selective mining unit. Outlier samples greater than 6.0% copper, 2.9 g/t Au, and 24 g/t Ag were top cut to 
limit the influence of high-grade samples. Grades were estimated into blocks measuring 5 m Easting x 5 m Northing 
x 5 m Elevation using Ordinary Kriging with a single-pass search strategy. Bulk density was estimated using inverse 
distance  weighting.  The  search  ellipses  were  oriented  to  match  the  modelled  geology.  Estimation  validation 
included visual checks, comparison of average grades to assess global bias, and generation of swath plots to assess 
smoothing of blocks compared to the de-clustered, input, composite data. 

Historically all Minto resources have been reported above a 0.5% Cu cut-off, as they demonstrated the potential for 
economic  extraction  by  being  captured  within  ultimate  pits  defined  by  pit-optimization  software.  With  the 
completion of the Main, Area 2 and Area 118 open pits, along with underground mining of some of the lenses 
below these pits, this rationale was revisited to ensure we continue to report the resources appropriately.  

Taking into consideration existing mine infrastructure, remaining mine life, and the tailings now contained in the 
Area  2  pit,  an  ultimate  pit  no  longer  captures  the  same  quantity  of  material  as  before.  SRK  re-assessed  the 
resources from both open-pit and underground perspectives. SRK first ran a Whittle shell to assess what could 
potentially be mined within an open pit using a 0.5% Cu cut-off. The Whittle shell run used the same economic 
parameters from the 2012 Phase VI PFS, and it was constrained by the Area 2 pit filled with tailings to the ultimate 
planned elevation of 799 m. The Whittle shell was significantly reduced from previous years due to the tailings 
restriction.  SRK  then  estimated  the  resource  grading  1%  or  greater  below  the  Whittle  shell,  to  demonstrate 
potential  for  economic  extraction  of  underground  resources.  Blocks  that  showed  a  consistent  trend  that 
demonstrated a potentially mineable zone were retained, whereas isolated blocks that were deemed not to have 
reasonable prospects for economic extraction were removed from the total.  

47 

 
The change in cut-off had the largest impact on the MSD and Minto East 2 deposits, both of which have thick 
sequences of sub-economic mineralization. Net changes to the resources due to the change in cut-off grade for 
reporting amounted to a decrease of 11,263 kt at 0.72% Cu for Measured and Indicated resources, and a decrease 
of 9,575 kt at 0.70% Cu for Inferred resources 

Mineral resources reported in Table 5 are based on the mineral resources models estimated by Dr. Wayne Barnett, 
P. Geo., Garth Kirkham, P.Geo., FGC, and Jeremy Vincent, P.Geo., and reflect mining activities until December 31, 
2016. Discounting of the mineral resource models for mining activities was undertaken by Douglas McIlveen, 
P.Geo., Chief Geologist with MintoEx, and a Qualified Person as defined by NI 43-101. Block model depletion from 
mining activities in 2016 totalled 1,603 kt at an average grade of 2.38% Cu. 

All  open-pit  mineral  resources  are  presented  above  a  0.5% copper  cut-off, while  underground  resources are 
reported above a 1.0% Cu cut-off grade. Mineral resources are reported inclusive of mineral reserves. Stockpiles 
are reported as Measured mineral resources. Measured and Indicated resources as at December 31, 2016 total 
30,918 kt at 1.15% Cu.  

48 

 
Classification 

TABLE 5: MINTO MINE ESTIMATED MINERAL RESOURCES AS AT DECEMBER 31, 2016 
Gold 
(g/t) 

Contained Copper  Contained Silver  Contained Gold 
(koz) 

Tonnes 
(kt) 

Copper 
(%) 

Silver 
(g/t) 

(koz) 

(kt) 

Minto South Deposit (MSD) (Open Pit and Underground) 
0.41 
1.09 

 38  

3 

Measured (M) 

3,466 

Indicated (I) 
Total (M+I) 
Inferred 

17,723 

21,189 
12,445 

 Measured (M) 
Indicated (I) 
Total (M+I) 
Inferred 

1,531 
3,534 

5,065 
318 

221 
257 

477 
28 

- 
919 

919 
124 

- 
2,778 

2,778 
1,889 

- 
- 

- 
1,419 

 Measured (M) 
Indicated (I) 
Total (M+I) 
Inferred 

 Measured (M) 
Indicated (I) 
Total (M+I) 
Inferred 

 Measured (M) 
Indicated (I) 
Total (M+I) 
Inferred 

 Measured (M) 
Indicated (I) 

Total (M+I) 
Inferred 

Stockpiles 
(Measured) 

1.08 

1.09 
0.80 

0.98 
0.87 

0.90 
0.75 

0.94 
1.00 

0.97 
0.70 

- 
2.35 

2.35 
1.48 

- 
1.72 

1.72 
1.38 

- 
- 

- 
1.42 

3 

3 
2 

2 
3 

3 
2 

3 
6 

0.37 

0.38 
0.22 
Ridgetop (Open Pit) 
0.25 
0.30 

0.28 
0.13 
Minto North (Open Pit) 
0.21 
0.61 

0.42 
4 
3 
0.32 
Minto East (Underground) 
- 
- 
1.01 
6.90 

7 
5 

1.0 
0.6 

 192  

 230  
 100  

15 
31 

46 
2 

2 
3 

5 
0 

- 
22 

22 
2 

Minto East 2 (Underground) 
- 
- 
0.80 
7 

- 
48 

7 
4 

0.80 
0.50 
Minto North 2 (formerly Inferno North) 

48 
26 

- 
- 

- 
5 

6 

- 
- 

- 
0.51 
Stockpiles 

0.41 

- 
- 

- 
20 

7 

489 

1.42 

Minto – Total Mineral Resources 

 Measured (M) 
Indicated (I) 

Total (M+I) 

Inferred 

5,707 
25,211 

30,918 
16,223 

1.09 
1.17 

1.15 
0.93 

3 
4 

4 
3 

0.36 
0.44 

0.42 
0.28 

62 
295 

357 
150 

 374  

 1,893  

 2,268  
 969  

 45.2  

 212.0  

 257.2  
 89.3  

105 
326 

431 
16 

20 
46 

67 
3 

- 
204 

204 
20 

- 
629 

629 
247 

- 
- 

- 
214 

92 

592 
3,098 

3,690 
1,470 

12.3 
34.1 

46.4 
1.3 

1.5 
5.0 

6.5 
0.3 

- 
29.8 

29.8 
2.5 

- 
71.8 

71.8 
30.1 

- 
- 

- 
23.3 

6.4 

65.5 
352.7 

418.2 
146.8 

NOTE: Dr. Wayne Barnett, Ph.D., P.Geo., of SRK Consulting (Canada) Inc. (“SRK”), is the Qualified Person  responsible for the mineralresource estimates of the MSD 
and Ridgetop deposits. Garth Kirkham, P.Geo., FGC, of Kirkham Geosystems Ltd., is the Qualified Person responsible for the mineral resource estimates of the 
Minto North, Minto East 2, and Minto North 2 deposits. Jeremy Vincent, P.Geo., Manager of Production and Development Geology at Capstone is the Qualified Person 
responsible for the estimate of the Minto East mineral deposit. Mineral resources are reported as at December 31, 2016 above a 0.5% Cu cut-off grade for potential 
open-pit scenarios and above a 1.0% Cu cut-off grade for underground mining scenarios.  Stockpiles  are  treated  as  Measured mineral  resources.  Mineral 
resources are not mineral reserves and do not have  demonstrated economic viability. Mineral resources are presented inclusive of mineral reserves. Totals 
may not sum exactly due to rounding. 

49 

 
 
The mineral reserve estimates for MSD – Area 2 pit were completed by Pooya Mohseni, P.Eng., Mine Manager with 
MintoEx, and a Qualified Person as defined by NI 43-101. The mineral reserve estimates were generated using a 
NSR model that estimates metal prices, exchange rates, mining dilution, mill recovery, concentrate grade, and 
offsite costs. Economic pit shells were generated using the Whittle™ mine planning software. The pit shells were 
further  optimized  by  Minto  personnel  to  developed  detailed  pit  designs.  In  the  fourth  quarter  of  2015,  an 
engineering change occurred whereby the Area 2 Pit mineral reserves were updated taking into account changes to 
MSD block model. No revisions were made to the Area 2 Pit reserves in 2016.  

The  mineral  reserves  for  the  MSD  –  Area  2  underground,  Minto  East  underground,  and  MSD  –  Copper  Keel 
underground were completed by Pooya Mohseni, P.Eng. The mineral reserves estimates were generated using a 
NSR model and then reported above a NSR cut-off value of C$ 64.40/t. The success in MSD – Area 118 and Area 2 
(M-zone) mining established the viability of the long-hole mining method at Minto. All underground reserves for 
the remaining MSD – Area 2 underground, Minto East underground, and MSD – Copper Keel underground zones 
are based on the long-hole mining method.  

In 2016, Area 2/Area 118 underground mineral reserves were depleted with the completion of mining of MSD – 
Area 118, and the start of mining of MSD – Area 2. In addition, the reserves for MSD – Area 2 underground and 
Minto East were updated using revised geological interpretations and block models. In total, the reserves for MSD – 
Area 2/Area 118 underground were reduced by 44% in tonnage and 32% contained copper in 2016. 82% of the 
reduction was due to depletion and 18% due to the geological interpretation and block model update. The Minto 
East update resulted in a reduction of 8% in tonnage and an increase of 6% in contained copper. Minor revisions 
were made to the MSD – Copper Keel underground reserves in 2016 as a result of revisions to the ore loss and 
dilution estimates. The MSD – Copper Keel underground reserve change is not material in nature. 

Underground production is scheduled to continue in MSD - Area 2 underground in 2017. 

All other mineral reserves remain unchanged except for the stockpiles, which experienced significant depletion. 
Kevin Cymbalisty, P.Eng., Chief Engineer at Minto Ex, and a Qualified Person as defined by NI 43-101, oversaw the 
process of discounting the mineral reserves models for mining activity until December 31, 2016 (Table 6).  

50 

 
 
 
TABLE 6: MINTO MINE ESTIMATED MINERAL RESERVES AS AT DECEMBER 31, 2016 
Gold 
(g/t) 

Contained Copper  Contained Silver  Contained Gold 
(koz) 

Tonnes 
(kt) 

Copper 
(%) 

Silver 
(g/t) 

(koz) 

(kt) 

- 

- 

- 

- 
807 

807 

- 
625 

625 

- 

381 

381 

- 
1,616 

1,616 

- 
- 

- 

489 

489 

489 
3,429 

3,919 

- 

- 

- 

- 
1.21 

1.21 

- 
2.07 

2.07 

- 

2.06 

2.06 

- 
1.73 

1.73 

- 
- 

- 

1.42 

1.42 

1.42 
1.71 

1.67 

Minto North Open Pit 
- 

- 

- 
MSD - Area 2 Open Pit 
- 
0.41 

- 

- 

- 

- 
1 

1 

0.41 
Minto East Underground 
- 
- 
0.89 
6 

- 

- 

- 

- 
10 

10 

- 
13 

6 

13 
0.89 
MSD – Area 2 / 118 Underground 
- 
- 

- 

8 

0.87 

8 

8 

8 
0.87 
MSD – Copper Keel Underground 
- 
- 
28 
0.63 

- 
6 

0.63 
6 
MSD - Wildfire Underground 
- 
- 
- 
- 

- 

6 

6 

6 
5 

5 

- 
Stockpiles 
0.41 

0.41 
Total Minto Reserves 
0.41 
0.65 

0.62 

28 

- 
- 

- 

7 

7 

7 
59 

65 

- 

- 

- 

- 
26 

26 

- 
120 

120 

- 

103 

103 

- 
315 

315 

- 
- 

- 

92 

92 

92 
563 

655 

- 

- 

- 

- 
10.6 

10.6 

- 
17.9 

17.9 

- 

10.7 

10.7 

- 
32.5 

32.5 

- 
- 

- 

6.4 

6.4 

6.4 
71.7 

78.2 

Classification 

Proven 

Probable 

Total 

Proven 
Probable 

Total 

Proven 
Probable 

Total 

Proven 

Probable 

Total 

Proven 
Probable 

Total 

Proven 
Probable 

- 

Proven 

Total 

Proven 

Probable 

Total Minto 

NOTE: Pooya Mohseni, P.Eng., Mine Manager at Minto, is the Qualified Person responsible for the estimation of the Minto mineral reserves. Mineral 
reserves are reported as at December 31, 2016. Mineral reserves are reported above a cut-off grade of 0.5% Cu for open-pit material and above a US$ 
64.40/t NSR cut-off for underground material. Stockpiles are treated as Proven mineral reserves. Metal price assumptions used to determine NSR cut-off 
for all deposits are: Cu=$2.50, Au=$300, Ag=$3.90. Process recoveries for all deposits are: Cu=91%, Au=70, Ag=78%. Totals may not sum exactly due to 
rounding. 

Mining Operations 

The Minto Mine is an open pit and underground mining operation that commenced in 2007. Open pit mining uses 
conventional drill and blast, and truck and shovel contractor fleet. Pit designs vary on the site but are typically 12 m 
benches with a double bench configuration. Underground operations primarily use long-hole open stoping, with 
some smaller areas of room and pillar. Access to the underground workings is via a single service and haulage ramp. 

51 

 
 
 
 
 
 
 
 
Run-of-mine ore is stockpiled on surface depending on the copper grade of the material. A loader transports the 
stockpiled material to the primary crusher which feeds a gyratory crusher. The crushed product is then fed to a 
conventional grinding and flotations circuit to produce a bulk copper concentrate. The concentrate is thickened and 
filtered to produce product suitable for transport. The product is transported by truck to Skagway, Alaska for 
export. 

In 2016, open pit mining activities were focused on the continued mining and completion of Minto North pit. 
Underground mining activities were focused on the completion of Area 118 production, and the development and 
start of production in Area 2. 

The Yukon Environmental and Socio-economic Assessment Board completed its evaluation for the Phase V/VI 
expansion in April 2014. An amended and renewed Quartz Mining Licence for the entire Phase V/VI expansion was 
received in December 2014. Minto received its Water Use Licence amendment for Phase V/VI operations in August 
2015. 

Federal and Territorial income tax applies to the Minto Mine. Taxable income generally starts with the before-tax 
cash flow and essentially deducts the cost of building and developing the mine and mill (Class 41a un-depreciated 
capital costs (“UCC”), Canadian exploration expenses (“CEE”) and Canadian development expense (“CDE”)) as 
would be expected over the life of the mine and as allowed by the Canadian tax rules. Generally Class 41a UCC and 
CEE can be deducted 100% against profit from the mine while CDE can only be deducted on a declining balance 
basis at 30% per year. The losses that are generated in the first few years of mine operation are deducted against 
income in later years. 

The Yukon QMA Royalty also starts with before-tax cash flow from the cash flow portion of the model and deducts 
depreciation at 15% per year on a straight-line basis for the mine capital assets and mill capital assets. It deducts 
deferred pre-operating costs that are not capital assets on a unit of production method. The Yukon QMA Royalty 
does not have a loss carryover or carry back provision. Taxes are paid at rates that increase as income increases to a 
maximum of 12%. 

Underground mining at Minto will continue until early Q4 2017 and surface mining of the Area 2 Stage 3 pit 
commenced in Q1 with completion expected in Q3 2017. The mill will continue to process stockpiled material and is 
scheduled to run at full capacity until the end of 2017. The current plan is to place the operation on temporary care 
and maintenance at the end of 2017. However, as Minto has an approximate 3-year mine life beyond 2017 in 
reserves, Capstone management is continuing to review the economics of additional mining which could extend 
operations. Depending on the outlook for copper prices in the second half of 2017, the option may exist to extend 
production from Minto into 2018 and beyond. 

The impairment of $44.9 million that was recorded in 2015 against the carrying value of Minto’s mineral property, 
plant and equipment reflected the shortened mine life as a result of the impact of near-term copper price volatility 
on the mine’s economics. The impairment was recorded based on a project valuation using a discounted cash flow 
model  based  on  the  most  current  operating  plan  and  assumptions  as  well  as  management’s  best  estimates, 
generally  relying  on  either  the  forward  markets  or  analyst  consensus,  for  metal  prices  and  exchange  rates. 
Management used an after-tax discount rate of 8%.  

The long-term metal price assumption used for the estimation of Mineral Reserves at Minto remains $2.50 per 
pound of copper.  

Exploration and Development 

No exploration activities are slated at Minto for 2017, although a limited amount of in-fill drilling, to tighten up 
spacing for short term planning purposes in areas of existing reserves, may be considered. 

Mining of the Minto North pit was completed in September 2016, with the mill continuing to process Minto North 
material until the end of Q1 2017.  

52 

 
Santo Domingo Project (Chile) 

With  copper  and  iron  prices  continuing  to  deteriorate  in  2015,  Capstone  suspended  most  work  on  its  Santo 
Domingo project in September 2015, and has since downsized the Santiago and Diego de Almagro offices in Chile. A 
decision to renew development work will be contingent on a range of factors, including an improvement in the 
longer term outlook for copper and iron prices. The Company has also taken two impairment charges, one in 2015 
and a second in 2016, to reflect the impact on value of the reduction in the consensus view of long term iron prices. 
Reference should be made to the consolidated financial statements which are available in their entirety on SEDAR 
at www.sedar.com under Capstone’s profile. 

In light of the current depressed iron market, a number of preliminary internal studies were carried out in 2015 to 
evaluate development options for copper only and/or copper with a deferred option to expand to iron production 
in the future. While these preliminary studies indicate the possibility of an economic case for a staged development 
of the resource, work was suspended in late 2015 due to depressed conditions in the commodities markets in 
general. In 2016 a study was completed that evaluated the economics of combining Santo Domingo with another 
copper deposit under a central processing facility. This study has been completed and next steps are presently 
being reviewed. 

The Santo Domingo Project is the subject of a report titled “Santo Domingo Project, Region III, Chile, NI 43-101 
Technical Report on Feasibility Study” dated May 22, 2014 (the “Santo Domingo Report”), that summarizes the 
Feasibility Study completed on the Project in 2014. This technical report was authored by Joyce Maycock, P.Eng., 
David Frost, FAusIMM, Vikram Khera, P.Eng., Carlos Guzman, FAusIMM, Roy Betinol, P.Eng., Hans Gopfert, P.Eng., 
Anna Klimek, P.Eng., David Rennie, P.Eng., and Tom Kerr, P.Eng., each a Qualified Person as defined in NI 43-101. 
The following descriptions of the Santo Domingo Project are based on assumptions, qualifications and procedures 
which are set out in the Santo Domingo NI 43-101 Technical Report. Reference should be made to the full text of 
this report which is available in its entirety on SEDAR at www.sedar.com under Capstone’s profile. 

Project Description and Location 

The Santo Domingo Project is based on a large open pit copper/gold/magnetite resource located approximately 
two hours north of Copiapó by paved road and 7 km southeast of the town of Diego de Almagro in Region III of 
Northern  Chile.  The  Santo  Domingo  property  was  originally  part  of  the  BHP  Candelaria  project  area,  which 
consisted of eight non-contiguous concessions in a north-south corridor extending between the towns of Taltal to 
the North and to a point about 75 km South of the city of Copiapó. 

The  project  was  owned  by  Far  West,  which  was  formerly  a  Toronto  Stock  Exchange  (“TSX”)  listed  mineral 
exploration company headquartered in Vancouver. The initial Candelaria Project land package assembled by BHP in 
2002 consisted of 3,434.5 km2 of exploration concessions. In 2002 and 2003, Far West and BHP entered into 
Project Area Agreements that allowed Far West to earn an interest in the concessions within the project area. 
Effective August 5, 2003, Far West assigned interests in the Project Area Agreements to its wholly owned Chilean 
subsidiary, Minera Lejano Oeste S.A. (“MLO”). On May 4, 2005, BHP terminated any interest in the concessions 
within the project area and commenced transfer of title of all these concessions to MLO in exchange for a retained 
2% NSR royalty. As of the date of the Santo Domingo Report, all concessions in the Candelaria Project area are 
100% owned by MLO. On June 17, 2011, Far West was acquired by Capstone at the same time as Capstone entered 
into a strategic relationship with Korea Resources Corporation (“KORES”). The terms of this relationship provided 
for amongst other things, a private placement in the equity of Capstone, representation on the Board of Directors 
of Capstone, the acquisition of a 30% interest in the project by KORES, participation in the financing of the project 
as well as an agreement to enter into a life of mine off-take agreement for 50% of the production of copper and 
iron from the project on prevailing market terms. 

Far West, a subsidiary of Capstone, controls 100% of four groups of concessions with a total of 178 claims (82 
exploitation concessions totalling 19,375 ha and 96 exploration concessions totalling 17,000 ha) that cover a total 

53 

 
of 36,375 ha and includes the areas of the planned mine site, plan area, and auxiliary facilities including proposed 
port facilities and the planned seawater and concentrate pipelines from the port to the mine. The centre of the 
deposit is located at approximately 26°28'00”S and 70°00'30”W. 

No surface rights are currently held by Capstone in the project area, but the process to acquire surface rights is well 
understood. We have proposed to consolidate Capstone’s property in the areas covering the deposit and the 
process facilities by purchasing these lands through the Ministerio de Bienes Nacionales. It will be necessary to 
either acquire a total of 3,901.3 ha or complete the creation of mining easements for the installation and use of 
various facilities. Capstone also proposes to apply for one or more mining rights-of-way in the areas of interest of 
the project such as the pipeline route, access roads and off-site ancillary facilities to safeguard these areas. The 
project has received government guarantees for the rights of way required by the Project for the areas currently 
identified. There is sufficient suitable land available within the exploitation concessions for the planned tailings 
disposal, mine waste disposal, and mining-related infrastructure such as the open pit, process plant, workshops and 
offices. 

The project as currently envisaged will not require an application for water rights. The water for the operation will 
consist solely of seawater. A maritime concession has been requested to allow the extraction of seawater. 

There  are  752  identified  permits  that  will  be  required  to  support  operations.  Fifteen  of  these  permits  are 
considered to be on the critical path for timely construction and start-up of the project. 

Accessibility, Climate, Local Resources, Infrastructure and Physiography 

Access to the Santo Domingo property area is 1 km off the paved highway C-17 from Diego de Almagro (5 km to the 
North) to Copiapó (approximately 120 km to the South). 

The Santo Domingo property is located in the Atacama Desert, one of the driest regions on earth. The climate is 
arid and the weather is generally clear and warm in all seasons and poses no limitations on field activities. The 
closest weather station where temperature and precipitation measurements have been recorded for some time is 
the city of El Salvador. The daytime high and low temperatures there are 26°C and 0.8°C for July, and 30°C and 
9.8°C for January, respectively. The highest average recorded precipitation is in May at 14.8 mm and the lowest is in 
December at 0 mm. 

The region has well-established infrastructure (power, water, transportation, work force, etc.) to service the mining 
community. There is no infrastructure at Santo Domingo property itself other than gravel roads for access to the 
property and drill sites. The project is approximately 1 km from a paved highway and 5 km from a sub-station that 
provides power to the town of Diego de Almagro. 

Several cities or towns are near the Santo Domingo property. Diego de Almagro, located adjacent to the property, 
has a population of approximately 16,000 people. Chañaral is a deep-sea port less than one hour’s drive to the west 
of the property. It has a population of approximately 10,000 people, hotel accommodations, food, fuel, and minor 
services. The most important logistical centre in the region is Copiapó, approximately two hours’ drive to the south 
of  the  Santo  Domingo  property.  It  has  a  population  of  approximately  150,000  people,  an  airport  with  daily 
scheduled flights to Santiago and Antofagasta, and abundant businesses offering services specific to mining and 
exploration. 

Vegetation is very sparse. In the valley bottoms, plant life consists of small, widely-spaced bushes a few tens of 
centimetres in height. Hillsides and peaks are generally devoid of any vegetation. In spite of the dry conditions, hills 
of gentle to moderate relief have been cut by deep gullies and flanked with gravel-filled valleys and alluvial fans; 
evidence of water movement preserved since conditions were less arid. Elevations range from approximately 900 
m to 1,500 masl. 

Seismic zone maps of South America indicate that the project area is likely to have high seismicity and the site is 
considered part of Zone 3 (shores) according to the Chilean National Design Code Nch2369, with a peak ground 

54 

 
acceleration of 0.4 g. Figure 4 illustrates the location of the proposed project infrastructure, including the seawater 
pipeline system, process  plant, thickeners, tailings distribution box, and open pit locations. 

FIGURE 4: SANTO DOMINGO PROPOSED PROJECT INFRASTRUCTURE 

History 

Mining for copper, gold, and iron has been ongoing in this area since early in the 19th century. Small mines in the 
region supplied copper ore to smelters in both Chañaral and Pan de Azúcar. Independent copper mines have been 
in operation on  what  is  now Anglo  American’s Manto Verde deposit (located 25 km Southwest of the Santo 
Domingo property) since the late 1800s, but significant production in this area started in 1906. Between 1906 and 
1935, a reported total of 400,000 tonnes grading in excess of 3% Cu was mined from the Manto Verde fault zone. 

Previous ownership of concessions in the Santo Domingo property is unknown. The area appears to have had a 
relatively long history of small-scale mining and prospecting. Mining activities on the nearby Manto Verde deposit 
date back to the late 1800s and it is probable that workings in the Santo Domingo property have a similar age. 

Many small inactive mines and a myriad of pits occur throughout the property area. The mines typically exploited 
copper  mineralization  hosted  in  narrow  (one  meter  to  five  meters)  steeply-dipping  veins  and,  in  some  cases 
adjacent strata to these veins. The largest mines are located along approximately 700 m of the Santo Domingo 

55 

 
 
structure. These mines include La Estrella, La Estrellita, El Iris, and others. Judging by the size of the dumps and 
number of adits, it is possible that this specific area produced upwards of 500,000 tonnes. A second area of minor 
production is a small open pit with peripheral underground workings on the Caprichosa concession in Target Area 
4a2 (Far West nomenclature) that may have produced in the order of 20,000 tonnes of copper oxide-bearing rock 
coming from a stratum dominated by specular hematite. However, surface workings at the majority of the mines in 
the Santo Domingo property (other than those noted above) are generally less than a few tens of metres in length 
and the extent of underground development is unknown. Judging by the quantity of dump material adjacent to 
most of these mines, it is probable that production was no more than a few thousand tonnes at any one site. 

The initial Candelaria Project land package was assembled by BHP in 2002, who then flew a Falcon™ gravity and 
magnetic survey over a portion of the northern Chilean Iron Belt, including the Santo Domingo Project area. In 2002 
and 2003, Far West and BHP entered into Project Area Agreements that allowed Far West to earn an interest in the 
concessions within the project area. Effective August 5, 2003, Far West assigned interests in the Project Area 
Agreements to MLO. On May 4, 2005, BHP terminated any interest in the concessions within the project area and 
commenced transfer of title of all these concessions to MLO in exchange for a retained 2% NSR royalty. 

Exploration  comprised  initial  geological  mapping  (50  km2)  at  1:25,000  scale,  surface  and  drainage  sampling, 
interpretation of existing airborne geophysical data, and induced polarization (“IP”) survey, and core and reverse 
circulation (“RC”) drilling that outlined the Santo Domingo Sur (“SDS”), Estrellita, and Iris deposits. Drilling was 
originally designed to target gravity and magnetic anomalies for IOCG mineralization of Candelaria or Manto-Verde 
style. In April 2005, drillhole 22 intersected iron oxide mantos with copper mineralization of grade and width that 
had the potential to be economic. Further drilling in the area outlined the SDS deposit. Subsequent drilling to the 
northwest of SDS following a north-northwest trending gravity anomaly discovered and outlined the Iris deposit 
with mineralization of similar style to SDS. Additional drilling in the northwestern part of the Santo Domingo area, 
around the small-scale Estrellita mine workings, outlined the Estrellita deposit, which is more similar to Manto 
Verde as it represents copper oxide mineralization along a fault zone. The 2008 drilling outlined a new zone of 
mineralization known as Iris Norte. Additional holes have been drilled to test other gravity and magnetic features in 
the Santo Domingo area and intersected widespread but discontinuous copper mineralization around the four 
outlined deposits. An initial copper-gold resource estimate was performed in 2006 for the SDS deposit and updated 
in 2007, which then included copper-gold resource estimates for Estrellita and Iris. As of May 31, 2010, drilling in 
the Santo Domingo area totalled 106,886 m in 398 holes. 

In 2008, a preliminary economic assessment (“PEA”) was undertaken. This envisaged two open-pit mining options, 
one being mining the SDS deposit for the recovery of copper, gold and iron from magnetite; the second being 
mining the SDS and Iris deposits for the recovery of copper, gold and iron from magnetite and hematite. The 
resource estimate supporting the PEA was updated to include iron as an element of interest. Results indicated that 
the options were revenue negative under the assumptions in the study; however, changes to the base-case metal 
price assumptions did result in positive economics, and additional work was recommended. 

Geological Setting 

The Santo Domingo deposit is located in the Chilean Iron Belt (“CIB”) to the east of the Atacama fault zone, a 
complex sinistral strike-slip and dip-slip fault system that runs sub-parallel to the coast of Northern Chile for over 
1,200 km. The CIB contains a large number of copper and iron deposits of cretaceous age. The geology of the belt 
consists  of  volcanic  flows  and  tuffs,  dioritic  intrusives  and  calcareous  sediments  typical  for  a  volcanic  arc 
environment. The geology of the Santo Domingo area is dominated by andesitic volcanic flows and limestone 
horizons with occasional outcrop of diorite intrusions. Large parts of the deposit are covered by younger cover 
consisting of clay and gravel. The CIB is characterized by a large number of small surface showings of copper oxide, 
frequently accompanied by specular hematite. The Santo Domingo deposit is essentially blind and is hosted by 
extensive tuff horizons that are overlain by andesitic volcanics. 

56 

 
The Santo Domingo Project lies on the east side of the Atacama fault complex which, in this area, consists of 
numerous clusters of generally north-south structural breaks in a belt approximately 30 km wide. It appears that 
the 10 km wide westernmost cluster, which hosts the Manto Verde copper deposit, is the main part of the fault 
system. 

The bulk of the  rock  exposed  in  the  Santo Domingo Project appears to overlie  the Punta del Cobre volcano-
sedimentary sequence. It is an intercalated and interfingered sequence of volcaniclastics, andesite flows, limestone, 
and calcareous sedimentary rocks, probably of the Lower Cretaceous Bandurrias and Chañarcillo Groups. The 
Bandurrias Group is defined as a predominantly volcanic sequence of andesite flows and volcaniclastic rocks. 
Chañarcillo Group rocks consist largely of limestone and calcareous marine sediments. Both definitions match 
observed geology on the Santo Domingo Project. The project area is divided into a number of structural blocks with 
different lithological characteristics suggesting the blocks are at different levels. 

Exploration 

Much of the exploration work in the Santo Domingo area was conducted by previous owners of the property. 
Exploration work completed by Capstone between August 2011 and May 2014 consisted of a detailed aerial survey 
of the plant site area using a scale of 1:1,000 and a 1 m contour spacing, which was prepared by Fugru Interra S.A. 
in 2012. The topography covers an area of approximately 16,000 ha for the plant site, port facilities and pipeline 
routes. 

Exploration work undertaken on the project in October 2013 consisted of a versatile time-domain electromagnetic 
(“VTEM”) and aeromagnetic geophysical survey covering 356 line-kilometres by Aeroquest Airborne or Aurora, 
Ontario, Canada. In November 2013, Aeroquest Airborne conducted an airborne z-axis tipper electromagnetic 
(“ZTEM”)  and  aeromagnetic  geophysical  survey  covering  369  line-kilometres.  In  2014  Condor  Consulting  Inc. 
(“Condor”)  assessed  available  geophysical  datasets  from  both  the  recent  and  historical  airborne  and  ground 
surveys  carried  out  during  the  past  12  years  in  the  project  area.  The  work  resulted  in  the  geophysical 
characterization of the signatures of the three mineralized occurrences (Santo Domingo, Iris, Estrellita) and the 
generation of seven target zones of varying priority for follow-up exploration. 

The project has been explored  for  its  large tonnage potential as a primary consideration.  There has been no 
exploration targeting small lenses of mineralization in the 1-5 Mt range. Copper oxide mineralization is known to 
exist on the property but has also not been targeted specifically. Additional potential exists for iron mineralization 
without copper, which so far has been deemed uneconomic by itself, but has potential once an operation is built in 
the project area. The main iron potential is located around Iris Norte and to the south of Santo Domingo Sur, where 
magnetite occurs in skarn zones of unknown size. 

Mineralization 

Copper-bearing IOCG-type mineralization is widespread in the Santo Domingo area. Specular hematite and copper 
oxides (including chrysocolla, brochantite, and malachite) are the typical near-surface mineral assemblages. Copper 
oxides typically persist to 70 m to 90 m below surface, with chalcopyrite being the dominant copper mineral at 
greater depths. 

Manto replacement-style mineralization in tuffaceous or calcareous sediments is widespread on the property. In 
the Estrellita and Estefania areas, several gently north-dipping, strata-bound iron oxide (specular hematite near 
surface, grading to magnetite at depth) ± copper horizons, up to 12 m thick, occur in roughly the same 200 m 
stratigraphic interval, and have been tentatively traced with drilling or extrapolated across 3 km of strike length. 
Mineralization typically occurs within a simple single-phase breccia of fine-grained, calcareous tuffaceous sediment. 
The breccia matrix typically consists of fine-grained specular hematite with disseminated, stringer and fracture-
coating copper oxides, and rare clots of chalcopyrite. Breccia horizons appear to be largely strata-bound, but to the 
south are discordant, following the steeply- dipping Santo Domingo fault, suggesting that this fault may have been 
a fluid conduit. 

57 

 
In the SDS deposit, copper mineralization occurs in a sequence of iron oxide mantos within a tuffaceous package 
between andesitic flows. Drilling has identified a 150 m to 500 m thick, mineralized sequence covering an area of 
approximately 1,300 m by 800 m. Mineralization consists of stacked chalcopyrite-bearing specularite-magnetite 
mantos, within tuff and tuffaceous sediments overlain by andesitic flows. 

The Iris deposit is approximately 500 m wide, with a strike length of 1,600 m. The deposit consists of iron oxide 
mantos and breccias along a North-Northwest-striking fault zone. Mineralization occurs close to surface at the 
Southern end and plunges gently towards the North. The distribution of copper mineralization in the Iris deposit is 
more erratic and irregular than in the SDS deposit, owing to the fact that structural control seems to have played a 
greater role in the Iris deposit than in the more continuous stratiform replacement style mineralization at SDS. The 
dominating iron oxide at Iris is hematite, while the main copper mineral is chalcopyrite. There are some old mine 
workings at the southern end of the deposit where copper oxides such as brochantite and chrysocolla were mined 
at surface. The mineralization is hosted by a specularite manto that is cut by steeply-dipping structures. The extent 
of mineralization at surface is approximately 100 m by 60 m. 

The Estrellita deposit is an east-west-striking, flat-lying to shallowly north-dipping tabular body lying approximately 
3.5 km northwest of SDS. The zone has been faulted into a series of four blocks which step downwards to the 
north, with displacement across the faults ranging up to approximately 75 m. The overall footprint of the zone 
measures 900 m long by 450 m wide, and is up to 100 m thick. The zone is thickest in the middle and narrows 
somewhat towards the periphery. There are narrower zones of limited lateral extent in the footwall of the main 
zone. Mineralization at the Estrellita deposit is a mixture of manto-style iron oxide and structurally controlled, vein-
style mineralization. The central part of the Estrellita deposit consists of a more or less horizontal tabular body of 
iron-oxide manto that appears to have formed at the intersection of a horizontal and a steeply dipping set of 
specular hematite structures. Mineral zoning is further complicated by the presence of copper oxides due to 
supergene weathering process affecting the deposit in areas nearer to surface. 

Drilling 

In late 2011 and early 2012, Capstone conducted an infill drilling campaign that was designed to elevate Indicated 
mineral resources located within the projected first three years of production to the Measured resources category. 
A secondary purpose was to collect material for metallurgical test work at the feasibility-study level. The campaign 
consisted  of 66  diamond  drillholes  for  a  total  of  13,282  m  of  additional  drilling.  A  revised  mineral  resources 
estimate incorporating the results of the latest infill drilling campaign has been included in the published NI 43-101 
Technical Report as well as the completed Definitive Feasibility Study (“DFS”). 

Drilling was contracted to Harris y Cia., Major Drilling, Geo Operaciones and Captagua, all based in Chile. Most of 
the RC drilling was conducted by a truck-mounted Schramm Rotadrill. The diamond drilling was conducted by 
various types of equipment. HQ-diameter core was typically drilled to a depth of approximately 300 m, below 
which NQ-diameter core (47.6 mm diameter) was drilled. Samples, taken in two-metre intervals for RC, were 
collected by drilling personnel, and tagged and organized by Far West personnel. A geologist was generally on site 
during most of the day shift for RC drilling. 

Diamond  drill  core  was  sampled  in  one-metre  (all  diamond  drillholes  before  2010)  or  two-metre  (diamond 
drillholes 2010) intervals that were marked by Far West geologists in order to adjust the samples to geological 
units. Most holes are vertical as the orientation of mineralization at SDS and Estrellita is horizontal or gently 
dipping. Inclined holes, particularly diamond holes, were drilled in order to establish the limits of mineralization at 
the edges of the deposits as well as to establish the structural framework at Estrellita, Iris, and Iris Norte. Drillhole 
collars  were  located  using  a  differential  GPS.  Coordinates  are  accurate  to  within  one  metre  or  less.  Relative 
elevations between holes in close proximity (such as at SDS) were determined using a tight chain and clinometer. 
Downhole surveying was conducted using a combination of gyroscope and accelerometer, with measurements 
taken every 10 m. 

58 

 
Sampling and Analysis 

Reverse circulation drill cuttings were collected at 2 m intervals. Core was nominally sampled at 2 m intervals. 
Samples for assay were marked at 1 m and 2 m intervals by technicians and subsequently adjusted by the geologist 
to correspond to major lithological contacts. For programs conducted prior to 2011, sample lengths were not less 
than 0.5 m and most did not exceed 2 m. The shortest and longest sample lengths in 2011–2012 were 0.7 m and 
2.7 m, respectively, and most samples were 2 m long. 

The primary analytical laboratory was ALS Chemex, and the facilities in La Serena, Chile and Antofagasta, Chile were 
used. Both of these facilities have ISO 9001:2008 accreditation and La Serena has ISO 17025 accreditation. Sample 
preparation consisted of drying, crushing to minus #10 Tyler >70%, homogenizing and then pulverizing to minus 
#200 Tyler >85%. Samples were analysed for 27 elements via ALS Chemex procedure ME-ICP61, using inductively 
coupled plasma (“ICP”). Gold assays were determined using fire assay with an AAS finish. Copper values over 
10,000 ppm were re-assayed. Due to the ME-ICP61 method understating the iron content, 7,401 samples from the 
2010 drill program were resubmitted for assay using a method with a more aggressive digestion; including all 
samples over 15% Fe inside the existing block model for which sample material was still available. Soluble copper 
analysis was conducted on 1,035 samples from 2011–2012 drilling. 

A  total  of  19,302  magnetic  susceptibility  measurements  have  been  recorded.  There  are  2,229  density 
measurements, performed by Far West Mining personnel on core samples using the water displacement method. 
Roscoe Postle Associates Inc. (“RPA”) developed regression formulae based on the specific gravity values reported 
by Far West Mining to convert volumes to weights, using Fe concentration as the independent variable. 

The QAQC protocols have remained largely consistent throughout all programs conducted by Far West Mining and 
Capstone. Minor changes have been implemented by Capstone to accommodate issues and recommendations 
from  past  programs  and  to  include  magnetic  susceptibility  measurements.  Certified  reference  materials  are 
inserted every 25th  sample, constituting 4% of the total number of samples submitted. Blanks, consisting of 
common Portland cement, were inserted every 50th sample. Field duplicates are taken every 25th sample. 

RPA considers that the drilling has been conducted in a manner consistent with standard industry practices. The 
spacing and orientation of the holes are appropriate for the deposit geometry and mineralization style. Sampling 
methods are acceptable, meet industry-standard practice, are appropriate for the mineralization style, and are 
acceptable for Mineral Resource estimation. The quality of the analytical data is reliable, and analysis and security 
are performed in accordance with exploration best practices and industry standards. 

Security of Samples 

The logging facility is fenced, locked when not occupied, and is secure. Samples are handled only by employees or 
their designates (i.e. ALS personnel). Regular data verification programs have been undertaken by third-party 
consultants from 2005 to 2014 on the data collected in support of the mineral resources and mineral reserves 
estimates on the Santo Domingo Project. RPA considers that as a result of this work, the data verification findings 
acceptably support the geological interpretations and the database quality, and therefore support the use of the 
data in Mineral Resource estimation. 

Metallurgical Sampling Program 

In 2014, 13 drillholes totalling 1,484 m of reverse circulation and 1,535 m of diamond core drilling (3,019 metres 
total) to obtain fresh material for additional metallurgical sampling were completed. The first five years of mine 
production was targeted during the drilling program and was completed solely within the Santo Domingo pit limits. 
The rock chips from the reverse circulation drilling were logged and bagged. Portions of the rock chips are to be 
used for the commissioning of the metallurgical testing pilot plant. The core obtained during diamond drilling was 
taken to the Diego de Almagro core storage area with all core being logged and having magnetic susceptibility 
testing completed prior to cutting. The core was then cut into a single half core and two quarter core sections. One 

59 

 
of the quarter core sections was sent to ALS Minerals in Antofagasta for assaying; the second quarter core section is 
being archived at Diego de Almagro; with the half core section to be provided to ALS Minerals in Santiago for the 
pilot plant testing program. A total of six composite samples (in addition to the commissioning sample) are to be 
prepared and tested during the pilot plant program. 

Mineral Resource and Mineral Reserve Estimates 

David Rennie, P.Eng., of RPA, is the Qualified Person responsible for the preparation of the mineral resources 
estimates for the Santo Domingo Project. The mineral resources estimates for Santo Domingo Sur, Iris, and Iris 
Norte have an effective date of August 31, 2012 and the mineral resources estimate for Estrellita has an effective 
date of October 30, 2007. 

RPA constructed 3D wireframe or solid models and gridded surfaces of the mineralized zones, fault structures and 
topography  for  use  in  constraining  the  block  grade  interpolations.  The  principal  controls  were  lithology  and 
structure; however, in some places a nominal grade shell boundary was used. Most zones required construction of 
wireframes for post-mineral dikes that transect the mineralized mantos. There are also some sequences of barren 
tuffs  that  were  modelled.  A  wireframe  model  was  also  created  to  enclose  oxidized  material  which  has  been 
demonstrated to yield much lower metallurgical recoveries than the un-oxidized mineralization. A modest amount 
of underground and open pit mining has been carried out at Estrellita. Far West personnel provided raw cavity 
monitoring device (CMD) data from which RPA was able to construct approximate wireframe models of the void 
spaces. A grade capping strategy was utilized that represented approximately 0.2% of the total number of assays in 
the Santo Domingo Sur, Iris and Iris Norte deposits. Grades at Estrellita were capped at 3% copper and 0.3 g/t gold. 
Samples from Santo Domingo Sur, Iris and Iris Norte were composited in downhole intervals of 4 m starting at the 
contact for each zone and continuing until the hole exited the zone. Drill samples at Estrellita were composited to 2 
m lengths, weighted by both length and density. Grades for copper, gold, iron, and magnetic susceptibility were 
interpolated into each block using ordinary kriging for the Santo Domingo Sur, Iris and Iris Norte deposits. The 
interpolation  was  configured  to  use  an  ellipsoidal  search  with  a  minimum  of  three  and  a  maximum  of  18 
composites and a maximum of three composites allowed from any one drillhole. For Estrellita, ordinary kriging was 
utilized to interpolate copper and gold grades into each block. Iron was not estimated. The search was constrained 
to a minimum of three and maximum of 12 composites, with a maximum of three composites from any one 
drillhole. Grade interpolations were validated, and no significant errors or biases were noted. Blocks receiving an 
estimate for copper were assigned to at least the Inferred category at Santo Domingo Sur, Iris and Iris Norte. All 
blocks with an average distance to composites of 200 m or less and for which the nearest composite was within 100 
m were classified as Indicated. Within the area of infill drilling completed in 2011–2012, a boundary was drawn 
around the 50 m drilling pattern and Indicated blocks encompassed by it were nominally assigned to the Measured 
classification. The final step in the classification was to use the oxide wireframe to tag oxidized blocks and remove 
these from the Mineral Resources. The classification of Indicated at Estrellita was applied to all blocks estimated by 
at least two drillholes with the closest composite less than 65 m away. Remaining blocks were classified as Inferred. 

RPA ran a pit optimization during 2009 using a Lerchs–Grossmann (LG) algorithm for Santo Domingo Sur, Iris and 
Iris  Norte  deposits.  Copper  equivalent  (CuEq)  grades  were  calculated  using  estimates  for  recovery,  toll 
treatment/refinement charges, and transport costs for each metal and based on the operating cost estimates 
contained in the 2008 Preliminary Assessment. At the 0.25% CuEq cut-off, all but 5% of the Mineral Resources were 
captured by the pit shell. On the basis of this result, it was concluded that there was little merit in restricting the 
Mineral Resources to those blocks contained only within the pit shell. In RPA’s opinion, the shape and depth of the 
Mineral Resources have not changed since the previous estimate and it is still valid to consider them as having 
reasonable prospects of economic extraction by open pit mining. The Estrellita resource estimate is not constrained 
within a LG shell. RPA’s opinion was that a 0.3% Cu cut-off would be appropriate for the reporting of the estimate. 
At the time of the estimate in 2007, RPA considered that the 0.3% Cu cut-off was similar to that used in other 
operations of similar size and grade. Table 7 summarizes the Santo Domingo mineral resources as at December 31, 
2016. No mining has occurred on the property. 

60 

 
Risk  factors  that  could  potentially  affect  the  Mineral  Resources  estimates  include  the  following:  long-term 
commodity price and exchange rate assumptions; changes in the assumptions used in the LG shell constraining 
mineral resources at Santo Domingo Sur, Iris, and Iris Norte; the assumed mining methods and cost assumptions for 
the Santo Domingo Sur, Iris, and Iris Norte deposits being those from the 2008 Preliminary Economic Analysis are 
not  those  arising  from  the  Feasibility  Study;  no  LG  shell  being  employed  to  support  reasonable  prospects  at 
Estrellita; delays or other issues in reaching agreements with local communities, changes in permitting, surface 
rights and environmental assumptions. 

TABLE 7: SANTO DOMINGO ESTIMATED MINERAL RESOURCES AS AT DECEMBER 31, 2016 
Deposit 

Tonnage 
(Mt) 

CuEq 
(%) 

Cu 
(%) 

Au 
(g/t) 

Santo Domingo Sur 
Iris 
Total Measured 

Santo Domingo Sur 
Iris 
Iris Norte 
Estrellita 
Total Indicated 
Total Measured and Indicated 

63.3 
1.54 
64.8 

214.0 
111.0 
92.3 
31.7 
449 
514 

Measured Resources 

0.95 
0.46 
0.94 

Indicated Resources 

0.72 
0.63 
0.67 
n/a 
- 
- 

Inferred Resources 

0.62 
0.43 
0.62 

0.33 
0.19 
0.12 
0.53 
0.27 
0.31 

0.083 
0.052 
0.082 

0.045 
0.028 
0.015 
0.05 
0.034 
0.04 

Fe 
(%) 

31.3 
25.3 
31.2 

27.4 
26.0 
26.7 
n/a 
25.0 
25.8 

0.55 
0.60 
0.70 
0.61 
n/a 
- 

29.8 
5.05 
20.5 
55.4 
2.7 
58.1 

0.26 
0.18 
0.08 
0.19 
0.48 
0.20 

Santo Domingo Sur 
Iris 
Iris Norte 
Inferred (Santo Domingo Sur/Iris) 
Estrellita 
Total Inferred 
NOTE: Mineral resources are reported inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic 
viability. The Qualified Person for the estimates is Mr. David Rennie, P.Eng., an employee of Roscoe Postle Associates Inc. Mineral resources for the Santo 
Domingo Sur, Iris, and Iris Norte deposits have an effective date of August 31, 2012. Mineral resources for the Estrellita deposit have an effective date of 
October 30, 2007. Mineral Resources for the Santo Domingo Sur, Iris, and Iris Norte deposits are reported using a cut-off grade of 0.25% copper equivalent 
(CuEq). CuEq grades are calculated using average long-term prices of US$3.50/lb Cu, US$ 1,500/oz Auand US$ 1.94/dmtu Fe (US$ 120/dmt conc. At 62% Fe). 
The CuEq equation is: Metal Value = Grade*Cm*R%/100*(Price-TCRC-Freight)*(100-Royalty)/100, where Cm is a constant to convert grade of metal, m, to 
metal price units; R is metallurgical recovery and %Cu Equivalent = (Cu Value + Au Value + Fe Value)/(Cu Value per 1%Cu). An assessment of Mineral 
Resources for the Santo Domingo Sur, Iris, and Iris Norte deposits was performedusing a Lerchs–Grossman pit shell that has the following assumptions: pit slopes 
averaging 45°; mining cost of US$1.19/t, processing cost of US$ 4.49/t; processing recovery of 85%; selling price of US$2.25/lb, and a selling cost of 
US$0.247/lb. At the 0.25% CuEq cut-off, all but 5% of the Mineral Resources were captured by the pit shell. On the basis of this result, it was concluded that 
there was little merit in restricting the Mineral Resources to those blocks contained only within the pit shell. Accordingly, the Mineral Resource inventory was 
reported in its entirety. Mineral Resources for the Estrellita deposit are reported using a cut-off grade of 0.3% Cu. Rounding as required by reporting guidelines 
may result in apparent summation differences between tonnes, grade and contained metal content. 

0.037 
0.024 
0.009 
0.025 
0.050 
0.026 

23.6 
26.7 
28.0 
25.5 
n/a 
24.3 

Mr.  Carlos  Guzman,  CMC,  a  NCL  Ingeniería  y  Construcción  SpA.  (“NCL”)  employee,  is  the  Qualified  Person 
responsible for the preparation of the Santo Domingo mineral reserves estimate as a part of the 2014 Feasibility 
Study. The effective date of the mineral reserves estimate is May 2, 2014. 

Pit optimization, mine design and mine planning were carried out by NCL using the 2012 block model prepared by 
RPA and did not include consideration of material classified as Inferred. Inferred Mineral Resources were treated as 
waste. A block size of 12.5 m Easting x 12.5 m Northing x 12 m Elevation was selected for the block model. The 
selected block size was based on the geometry of the domain interpretation and the data configuration. The mining 
cost estimate for the pit optimization process is based on studies developed by NCL during 2012. The estimated 
average project mining cost was separated into various components such as fuel, explosives, tires, parts, salaries 
and wages, benchmarked against similar current operations in Chile. Each component was updated for first-quarter 
2013 prices and the exchange rate from Chilean Pesos to US dollars. This resulted in an estimated mining cost of 

61 

 
approximately $1.53/t. The metal prices, processing costs, refining costs, and processing recoveries were provided 
to NCL by Capstone. A number of calculations were performed in the model in order to determine the NSR of each 
individual block. The internal (or mill) cut-off of $7.84/t milled incorporates all operating costs except mining. This 
internal cut-off is applied to material contained within an economic pit shell, where the decision to mine a given 
block was determined by the pit optimization and was applied to all of the Mineral Reserve estimates. Marginal ore 
was calculated for the same $7.84/t cut-off, but for a NSR determined at higher metal prices. Final slope angles 
used for the pit optimization process were a result of multiple iterations and analysis carried out by the NCL mining 
team and geotechnical specialists Derk Ingeniería y Geología Ltda (“Derk”). The original block model was based on 
an ore percentage with dimensions of 12.5 m x 12.5 m x 12 m, resulting in a 1,875 m3 block volume; this means 
that every block has a defined “ore” proportion with an ore density, and a corresponding “waste” proportion with a 
waste density. To accommodate selective mining methods, any resource block with an ore percentage that was 
<10% was treated as waste. Blocks with an ore percentage that was higher than 90% were diluted with waste such 
that all high-ore blocks were considered to contain only 90% ore. Selective mining therefore will be performed on 
those blocks that have an ore percentage of between 10% and 90%. The Santo Domingo mineral reserves estimate 
is summarized in Table 8. 

In  the  opinion  of  the  NCL,  the  main  factors  that  may  affect  the  Mineral  Reserves  estimate  are  metallurgical 
recoveries and operating costs (fuel, energy and labour). NCL notes that the base price, as well as changes in the 
price of metals, even though this is the most important factor for revenue calculation, does not affect the Mineral 
Reserves estimate to any significant degree. A revenue factor of 0.86 was used for the LG shell that was employed 
as the guide for the practical design for both the Santo Domingo and Iris Norte pits. This selected revenue factor is 
conservative  and  as such allows  for a broad swing in metals pricing before any salient effect on the Mineral 
Reserves estimate will occur. 

TABLE 8: SANTO DOMINGO ESTIMATE MINERAL RESERVES AS AT DECEMBER 31, 2016 
Contained Metal 
Au 
(koz) 

Grade 
Au 
(g/t) 

Tonnage 
(Mt) 

Cu  
(kt) 

Cu 
(%) 

Fe 
(%) 

Stage 

398 

679 
97 
777 

169.9 

300.5 
36 
336.4 

Magnetite 
Conc. (Mt) 

8.2 

48.3 
18.7 
66.9 

Santo Domingo Sur 

65.3 

0.61 

0.08 

30.9 

Probable Reserves 

Proven Reserves 

Santo Domingo Sur 
Iris Norte 
Total Probable 

251.6 
74.8 
326.4 

0.27 
0.13 
0.24 

0.04 
0.01 
0.03 

27.9 
26.9 
27.6 
Total Mineral Reserves 
28.2 

0.04 

0.30 

391.7 

Proven + Probable 
NOTE: The mineral reserves estimate have an effective date of May 2, 2014 and were prepared by Mr. Carlos Guzman, CMC, and employee of NCL.  Mineral 
Reserves are reported as constrained within Measured and Indicated pit designs, and supported by amine plan featuring variable throughput rates and cut-off 
optimization. The pit designs and mine plan were optimized using the following economic and technical parameters: metal prices of US$ 2.75/lb Cu, US$ 1,275/oz Au 
and US$80/dmt of Fe concentrate; recovery to concentrate assumptions of a maximum of 93.6% for Cu and 75% for Au, with magnetite concentrate recovery 
varying on a block-by-block basis; copper concentrate treatment charges of US$70/dmt, U$0.07/lb of Cu refining charges, US$5.0/oz of Au refining charges, 
US$48/wmt and US$3/wmt for shipping Cu and Fe concentrates respectively; waste mining cost of $1.53/t, mining cost of US$1.53/t ore, and process and G+A costs 
of US$7.84/t processed; average pit slope angles that range from 37.6º to 43.6º; a 2% royalty rate assumption, and an assumption of 100% mining recovery. 
Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. 

506.3 

1,175 

75.1 

Mining Operations 

A mine plan was developed for the Santo Domingo Project to process 60,000 tpd to 65,000 tpd of feed (21.9 to 23.7 
Mt/a) with a peak total mining rate of 107.5 Mt/a in Years 1 to 4. Because of the softer characteristics of the initial 
feed (higher copper content and lower magnetite), an initial period of five years was scheduled for a plant feed of 
65 kt/d. From Year 6 the plant throughput is scheduled for 60 kt/d. Year 1 feed to the plant is made up of material 
mined during pre-production and Year 1. Oxide material has been identified and will be stockpiled separately. 

62 

 
 
Mill throughput was also restricted to a magnetite concentrate production capacity of a maximum 4.5 Mt/a up to 
Year 10; and 5.4 Mt/a from Year 11. For the first 5 years of operation, Santo Domingo will have an annual average 
production of approximately 248 million pounds of copper contained in 388,000 dmt of concentrate (at an average 
copper content of 29%). The life of mine (“LOM”) average is 128 million pounds of copper in approximately 200,000 
t of concentrate per year over a period of approximately 18 years. The total life of mine production is estimated to 
be 2.29 billion pounds of copper contained in 3.58 million tonnes of concentrate. For the same period, the average 
magnetite concentrate production is estimated to average 3.26 million dmt per year. The magnetite concentrate 
production will average 4.19 million  dmt per year over the life of mine with  a total estimated production of 
approximately 75.08 million dmt. The first 5 years production does not include the Year 0 ramp up. 

The final pit design was based on a Lerchs–Grossmann (LG) shell that used a copper price of $2.75 per pound and 
US$ 80/t for magnetite concentrate. Two pits, the Santo Domingo pit and the Iris Norte pit, were designed. The 
Santo Domingo pit will have four phases; three mining phases are planned for the Iris Norte pit. 

In the Santo Domingo pit, the Phase 1 targets the material with the highest grade and lowest strip ratio in the 
central area, down to 892 m elevation. Phases 2 and 3 are successive expansions to the north, down to 772 m and 
736 m elevation, respectively. Phase 4 in Santo Domingo is in the area called Iris which is at the north of the Santo 
Domingo pit, but has a separate access to the east side and will go down to 676 m elevation. 

Three mining phases were designed in Iris Norte, as successive expansions from south to north, going down to 736 
m, 724 m and 664 m elevation, respectively. Each phase has access from the east and west sides. 

The Santo Domingo pit will have two exits on the west side providing access to the ROM pad area and the primary 
crusher. On the east side there will be another exit to access the main waste storage area. The final pit will be 2,200 
m long in the north–south direction and 1,500 m wide in the east–west direction. The pit bottom will be at the 676 
m elevation and the highest wall will be about 552 m on the southeastern side. The total area to be disturbed by 
the pit is approximately 229 ha. 

The Iris Norte pit will have one exit on the west side providing access to the run-of-mine (ROM) pad area and the 
primary crusher. On the east side there will be an exit to access the waste storage area. The final pit will be 1,600 m 
long in the north–south direction and 900 m wide in the east–west direction. The pit bottom will be at the 664 m 
elevation, and the highest wall will be about 315 m on the north side. The total area to be disturbed by the pit is 
about 124 ha. 

Mine equipment requirements were calculated based on the annual mine production schedule, the mine work 
schedule and equipment hourly production estimates. The study is based on operating the mine with 42 m3 
capacity hydraulic excavators (shovels) and trucks with a capacity of 290 t. The fleet will be complemented with 
drilling rigs for ore and waste. Auxiliary equipment will include tracked dozers, wheel dozers, motor graders and a 
water truck. A small drill rig was also included for pre-splitting purposes. 

The primary crushing plant will receive run-of-mine feed directly from the open pits. The crusher is designed to 
allow two 290 t trucks to discharge directly into the crusher dump pocket. The crushed product will be conveyed to 
the coarse ore stockpile (COS) which has a live capacity of six to eight hours of operation. From the COS ore is then 
conveyed to the SAG mill. The SAG mill product will discharge onto a conventional vibrating deck screen with the 
screen undersize pumped to two separate batteries of hydrocyclones. 

The hydrocyclone overflow streams (the copper flotation circuit feed stream) with a P80 of 180 µm will be fed to a 
single rougher; single scavenger; and three stage cleaner concentrate production plant. The rougher concentrate 
will be reground using a vertical mill prior to introduction to the cleaner/scavengers. The rougher flotation stage 
tailings will be pumped to magnetic separation that consists of two lines each with five individual primary LIMS 
(1,000 gauss low intensity magnetic separators) magnetic drum separators. 

63 

 
The rougher magnetic concentrate from each magnetic drum line will be sent to grinding and classification; the 
rougher magnetic concentration tailings will report to the main plant tailings stream. The cleaning circuit magnetic 
LIMS concentrator will consist of two parallel lines each with three LIMS drum separators operating in a counter-
current configuration to facilitate high selectivity. The final magnetite concentrate will be pumped to the magnetite 
concentrate thickener prior to being sent (via a 12 inch pipeline) to the magnetite filter plant located at the port. 

The first stage of tailings thickening (pre-thickening) will be conducted at the process plant and the second stage 
(final thickening) is conducted at the TSF area. Recovered water from the thickeners will be pumped back to the 
process water pond with thickened tailings being transferred to the TSF area for deposition. 

Copper  concentrate  will  be  filtered  at  the  process  plant.  During  the  concentrate  filtration  washing  stage, 
desalinated water will replace the seawater contained in the copper concentrate cake to reduce the chloride 
content to less than 300 ppm. Copper concentrate filter cake will discharge by gravity to the copper concentrate 
stockpile. 

The magnetite concentrate will be received at the port in an agitated storage tank and then pumped directly to the 
filter plant to obtain a magnetite concentrate. There will be four horizontal filter presses with desalinated water 
used  for  washing  to  reduce  the  chloride  content  of  the  concentrate  to  less  than  300  ppm.  The  magnetite 
concentrate filter cake product will discharge onto a conveyor feeding the concentrate transfer tower and then the 
magnetite concentrate stockpile. 

All of the process makeup water will be seawater prior to the rinsing of the copper and magnetite concentrate 
during the filtering process. Rinse water used during the filtering process will be supplies by reverse osmosis water 
treatment plants located at both the port and the process plant. 

Both the copper and magnetite concentrate will be ship loaded at the port for transport to selected buyers. KORES 
is required to purchase 50% of the annual production of copper and iron ore concentrates produced by the project. 
Capstone will market and sell the remaining 50%. The KORES terms and conditions will reflect the Capstone terms 
negotiated independently in the market. Capstone is currently researching the market for buyers for the remaining 
50%  of  the  copper  and  iron  concentrate  production.  Baseline  environmental  studies  were  carried  out  for 
communities in the area of influence of the project: Diego de Almagro, Inca de Oro, El Salado, Chañaral, Flamenco, 
Torres del Inca, Obispito and Caldera. 

Physical environment baseline studies included characterization of climate, meteorology, air quality, sedimentable 
particulate material (SPM), gases, noise and vibration, geology, geomorphology, natural hazards, soils, hydrology 
and hydrogeology. The marine environment baseline studies included characterization of the physical environment, 
chemical, and biological. The biotic environment baseline studies addressed the fauna and flora components of the 
project.  The  anthropological  environment  baseline  studies  for  the  port  and  proposed  mine  site  included  the 
description of human component, constructed environment, cultural heritage and palaeontology and landscape 
issues. Baseline studies were also completed to address current water resources. Based upon the study results, no 
impacts to local water resources are anticipated as the project will use seawater for the mining process. Four key 
areas of risk were identified from the completed baseline studies, as follows: 

•  Water: 

o  Alteration of the surface water flow and drainage patterns 
o  Alteration in the underground water flow and/or water quality 

•  Air quality: 
o 

Increases  in  the  levels  of  breathable  particulate  material  (PM10),  breathable  fine  particulate 
material  (PM2.5) and gases (primarily as a result of wind activity on stockpiles, dust generation from 
construction  and mining activity and material transport) 
Increases in levels of sedimentable particulate matter 

o 

64 

 
•  Marine environment: 

o  Potential disruption  to benthic communities due to the operation of the seawater intake and 

brine  discharge systems and port construction activities 

•  Human environment: 

o  Effects of the project on the current lifestyles of local communities 

Studies were completed to identify potential mitigation measures to address the recognized risks. Mitigations 
proposed  include, but are not limited to, community liaison and development programs, construction of settlement 
by-pass roads,  implementation of zero-discharge facilities, and reviews of and modifications to infrastructure designs 
to accommodate  community and environmental concerns. 

A stakeholder identification study has been completed, and has identified a number of parties will be either directly 
or  indirectly affected by project influence. A number of communication sessions were undertaken during 2012 and 
2013, and  included open houses and meetings, sessions to address specialist interests (such as fishermen); meetings 
with regional  authorities, community support service authorities, and professional organizations. 

Community issues identified during these meetings include: 

Job opportunities for local residents during the construction and operation phases of the project 

• 
•  Decreased quality of life due to increased demand for local supplies of goods and services, housing, and 

health services 

•  Environmental effects related to mining activities 
•  Changes to road usages due to by-pass construction and concentrate transport 
•  Effect of the proposed port facilities on seafood extraction activities 
•  Effects of seawater intake and brine discharge from the desalination plant. 

The Environmental Impact Assessment (“EIA”) submitted for review on October 30, 2013 was approved on July 8, 
2015.  During the EIA the environmental citizen participation (PAC) process as required by the evaluation process will 
continue.  The citizen participation process with indigenous communities takes into account the special rules 
that govern the  consultation and participation processes of such peoples. Although the lands of the Colla Community 
of  Diego  de  Almagro  are  not  within  the  direct  area  of  project  influence,  Capstone  will  keep  lines  of 
communication  open  for  possible  approaches or inquiries from this community. 

All capital costs are in third quarter 2013 US$. Capital cost estimates were prepared by the various consultants working 
on  the  2014  Feasibility  Study  and  were  based  on  battery  limits  established  by  Capstone.  Owner  costs  were 
provided by  Capstone. Estimates were based on a combination of direct quotes and benchmarking. The estimate is a 
Type 3 estimate  according to AMEC standards (and the Association for the Advancement of Cost Engineering 
International, AACE), with an  accuracy of -10 to +15% at the 85% confidence level. The initial capital cost was 
estimated at $1,751 M; with an estimated  sustaining  capital  cost  total  of  $376.3  M.  The  combined  initial  and 
sustaining capital costs for the life of mine were  estimated to be $2,127 M in total (Table 9). 

65 

 
 
 
TABLE 9: INITIAL CAPITAL COST ESTIMATE 

Area 

Initial Capital  Mine 

Process Plant 

Tailings and Water Reclaim 

Plant Infrastructure (On Site) 

Port 

Port Infrastructure (On Site) 

External Infrastructure (Off Site)  

Indirect Costs 

Contingency 

Total Initial Capital 

Total Project Sustaining Capital 

Project Total Cost 

Cost 

(US$M) 

174.4 

341.8 

49.9 

97.1 

157.5 

27.5 

235.9 

437.3 

229.3 

1,750.7 

376.3 

2,127.0 

The operating costs are also presented in third quarter 2013 US dollars. For the copper equivalent estimate, prices 
of $2.85/lb copper and $85.00/t magnetite concentrate were used. The operating cost estimate is considered to be 
at a Feasibility-Study level, with an accuracy of -10% to +15%. Operating costs are summarized in Table 10. 

TABLE 10: OPERATING COST ESTIMATE 
LOM Average 
LOM Total 
(US$/t) 
(MUS$) 

LOM  Average 
(US$/lb CuEq) 

Cost Centre 
Process 

Copper Concentrate Transport 

G & A 

Mining 

Total 

2,753.4 

54.5 

439.6 

2,513.4 

5,760.9 

7.03 

0.14 

1.12 

6.42 

14.71 

0.607 

0.012 

0.097 

0.555 

1.271 

For purposes of the project capital and operating cost estimates, a fixed foreign exchange rate between Chilean 
Pesos  (CLP) and US dollars (US$) was initially used. However, during the DFS estimate development, the foreign 
exchange rate  between the CLP and US$ changed appreciably. To accommodate this change Capstone completed 
an update to the  foreign exchange rate for the operating and capital cost estimates. 

•  For an updated foreign exchange rate for the development period from 2014 through 2017, Capstone used 
the mean  value  of  the  projected  CLP  to  US$  foreign  exchange  rate  from  a  total  of  29  analyst  firms 
compiled by  Bloomberg (as of May 6, 2014). 

•  For an updated foreign exchange rate for the operating period from 2018 through 2035, Capstone used 
an  algorithm that was developed using the CLP/US$ exchange rate value versus the market sales price of 
copper.  This information was gathered over the last 10 years on a daily basis and resulted in the following 
algorithm: 

CLP/US$ Exchange Rate = -0.0204 (price of Cu in US$/t) + 660.41 

66 

 
 
 
For the 2014 Feasibility Study copper price of US$2.85 (US$6,281/t), this equates to a CLP/US$ rate of 532.  The 
exchange rate assumptions are detailed in Table 11. 

TABLE 11: FOREIGN EXCHANGE RATE ASSUMPTIONS 

Initial Capital Cost Estimate (excluding mine equipment) 

Sustaining Capital Cost Estimate (excluding mine equipment) 

Process Operating Cost Estimate 

G&A and Copper Hauling Operating Cost Estimate 

Initial Mine Equipment Capital Cost Estimate 

Sustaining Mine Equipment Capital Cost Estimate 

Mine Operating Cost Estimate 

2014 

2015 

2016 

2017 

2018 through 2035 (Operating Period) 

Initial Foreign  Exchange Rate 
(CLP/US$) 
480 

480 

480 

480 

500 

500 

500 

Revised Foreign  Exchange Rate 
(CLP/US$) 

553 

557 

517 

519 

532 

There were no impacts on the copper hauling operations or G&A as these values were originally estimated in US$. 

The project has been evaluated using an 8% discounted cash flow (DCF) analysis on an after-tax basis. To reflect the 
time value of money, annual net cash flow (NCF) projections are discounted back to the DFS project valuation date 
of third quarter 2013 using an 8% discount rate. The discount rate appropriate for the Santo Domingo project has 
been determined using several factors, including the type of commodity and the level of project risks (market risk, 
technical risk and political risk). The discounted present values of the cash flows are summed to arrive at the 
project net present value (NPV). 

An NPV sensitivity analysis was completed using discount rates of 5%, 8% (selected rate), 10%, 12% and 15%. In 
addition to the NPV, the internal rate of return (IRR) and payback period were also calculated. In the calculation of 
IRR it is assumed that any intermediate cash flows can be reinvested at the same rate of return. Cash flows are 
assumed to occur at the end of each period. 

On an after-tax basis, the cumulative net cash flow for the base case is US$3,226.7 million, the IRR is 17.9% and the 
payback period is 4.2 years. Based on the assumptions made the cash flow analysis shows that the project will 
generate positive cash flows from the first full year of production onwards. At an 8% discount rate, the after-tax net 
present value (NPV) of the project is US$797.4 million. The cash flow analysis for the base case is provided in Table 
12. 

The after-tax annual and cumulative cash flow are shown in Figure 5. 

67 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TABLE 12: RESULTS OF FINANCIAL ANALYSIS 

Summary of Cash Flow 

Unit 

Pre-tax 

After-Tax 

Cumulative net cash flow 

Undiscounted 
Net present value 
Discounted at 5% 

Discounted at 8% 
Discounted at 10% 
Discounted at 12% 
Discounted at 15% 
Internal rate of return 
Payback period 

US$ M 

4,251.9 

3,226.7 

US$ M 

US$ M 
US$ M 
US$ M 
US$ M 
% 
Years 

1,889.8 

1,154.1 
818.8 
568.0 
302.5 
21.3 
4.0 

1,374.7 

797.4 
534.7 
338.8 
132.5 
17.9 
4.2 

As stated, the project was evaluated on an after-tax basis with taxes payable in three forms: 

FIGURE 5: PROJECT AFTER TAX CASH FLOW 

•  Government mining royalty 
•  First Category corporate income tax 
• 

IVA. 

Since January 1, 2006, mine operators whose annual sales exceed the equivalent 12,000 tonnes of fine copper must 
pay a mining royalty tax. The mining royalty is levied on operating mine income on a sliding scale between 5% and 
14%, depending on operating margins. The royalty is estimated to be $241.0 M over the LOM and is deductible as 
an expense against corporate tax. 

Corporate income tax consists of the First Category Tax at 27%. Total First Category Tax payments over the LOM are 
estimated to be $784.2 M. The 15% Second Category “Additional” Tax was not evaluated for the project. This 
Second Category Tax is levied on dividend distributions to foreign shareholders. 

An IVA of 19% is applicable to a number of goods and services purchased but this tax is refundable once the mine is 
in operation. Other than the delay in the recovery of IVA during construction and the impact of the time value of 
money, the LOM net effect of IVA is zero. 

68 

 
 
 
 
 
 
 
 
 
The project evaluation is primarily on an equity funded basis. Where opportunities to utilize debt capital to fund 
the project are considered, interest shields may reduce the income tax burden of the project, but will require 
planning to consider Chilean thin capitalization requirements and withholding taxes on interest. 

Project investors will need to consider the merits of utilizing a D.L. 600 Foreign Investment Contract (“D.L. 600 
Contract”) to contribute the capital investment into the project. A D.L. 600 Contract provides the ability to elect tax 
invariability treatment for the project. Article 11 ter of D.L. 600 provides foreign investors the right to an invariable 
mining royalty rate for a period of 15 years from the project start date. Article 11 bis of D.L. 600 allows an investor 
to elect an invariable income tax rate of 42% (versus the 35% combined First and Second Category Tax) for 20 years 
for a mining project. Effective January 9, 2014, the Chilean Foreign Investment Committee approved the D.L.600 
Article 11 ter Foreign Investment Contract for Capstone’s investment in the Santo Domingo project. 

4 – RISK FACTORS 

Capstone is subject to a number of significant risks due to the nature of our business which includes acquisition, 
financing, exploration, development and operation of mining properties and ownership of a rail transportation 
company.  You  should  carefully  consider  the  risks  and  uncertainties  described  below  and  other  information 
contained in this Annual Information Form before deciding whether to invest in Capstone common shares. The risks 
and uncertainties described below could have a material adverse effect on our business, financial condition or 
results of operations, and the trading price of our common shares may decline and investors may lose all or part of 
their investment. We cannot give assurance that we can control or will successfully address these risks or other 
unknown risks that may affect our business. Additional risks or uncertainties not presently known to Capstone or 
that Capstone currently considers immaterial may also impair our business operations. 

Mining is inherently dangerous and subject to conditions or events beyond Capstone’s control, the occurrence of 
which could have a material adverse effect on Capstone’s business, financial condition, results of operations and 
prospects. 

Capstone’s  operations  are  subject  to  all  the  hazards  and  risks  normally  encountered  in  the  exploration, 
development and production of copper and other metals, including, without limitation, fires, power outages, 
labour disruptions, flooding, explosions, cave-ins, landslides and other geotechnical instabilities, equipment failure 
or structural failure, metallurgical and other processing problems and other conditions involved in the mining of 
minerals, any of which could result in damage to, or destruction of, our mines, plants and equipment, personal 
injury or loss of life, environmental damage, delays in mining, increased production costs, asset write-downs, 
monetary losses and legal liability. The occurrence of any of these events could result in a prolonged interruption in 
Capstone’s operations that would have a material adverse effect on Capstone’s business, financial condition, 
results of operations and prospects. 

Changes  in  the  market  price  of  copper  and  other  metals  could  negatively  affect  the  profitability  of the 
Company’s operations and financial condition. 

The commercial viability of Capstone’s properties and Capstone’s ability to sustain operations is dependent on, 
amongst other things, the market price of copper, lead, zinc, gold, silver and molybdenum. Depending on the 
expected price for any minerals produced, Capstone may determine that it is impractical to continue commercial 
production at the Pinto Valley Mine, the Cozamin Mine or the Minto Mine or to develop the Santo Domingo 
Project. 

A  reduction  in  the  market  price  of  copper,  lead,  zinc,  gold,  silver,  or  molybdenum  may  prevent  Capstone’s 
properties from being economically mined or result in the write-off of assets whose value is impaired as a result of 
low metals prices. The market price of copper, lead, zinc, gold, silver and molybdenum is volatile and is impacted by 
numerous factors beyond Capstone’s control, including, amongst others: 

• 
• 

the supply/demand balance for any given metal; 
international economic and political conditions; 

69 

 
speculative activities; 
increased production due to new mine developments; 

•  expectations of inflation or deflation; 
• 
international currency exchange rates; 
• 
interest rates; 
•  global or regional consumptive patterns; 
• 
• 
•  decreased production due to mine closures; 
• 
improved mining and production methods; 
•  availability and costs of metal substitutes; 
•  new technologies that use other materials in place of our products; 
•  metal stock levels maintained by producers and others; and 
• 

inventory carry costs. 

The effect of these factors on the price of base and precious metals cannot be accurately predicted and there can 
be no assurance that the market price of these metals will remain at current levels or that such prices will improve. 
A decrease in the market price of copper, lead, zinc, gold, silver or molybdenum would affect the profitability of the 
Pinto  Valley  Mine,  the  Cozamin  Mine  and  the  Minto  Mine  and  could  affect  Capstone’s  ability  to  finance  the 
exploration and development of our other properties, which would have a material adverse effect on Capstone’s 
business, financial condition, results of operations and prospects. 

Within this industry context, the Company’s strategy is to maintain a cost structure that will allow it to achieve 
adequate levels of cash flow during the low point in the copper price cycle. Circumstances may arise, however, 
where increased certainty of cash flows is considered more important to long term value creation than providing 
investors short term exposure to the volatility of metal prices. In these circumstances, the Company may elect to fix 
prices within a  contractual quotational period  and/or to lock in  future prices through the variety  of financial 
derivative  instruments  available.  There  are,  however,  risks  associated  with  programs  to  fix  prices  including, 
amongst other things, the potential risk that the counter party will not be able to meet their obligations, the risk of 
opportunity losses in the event of an increase in the world price of the commodity, the possibility that rising 
operating costs will make delivery into hedged positions uneconomic, and production interruption events. 

Financial covenant compliance risks 

The terms of Capstone’s amended senior secured corporate revolving credit facility requires that Capstone satisfy 
various affirmative and negative covenants and meet certain quarterly financial ratio tests. These covenants limit, 
amongst other things, Capstone’s ability to incur further indebtedness if doing so would cause it to fail to meet 
certain financial ratio tests. They also limit the ability of Capstone to create certain liens on certain assets or to 
engage in certain types of transactions. A failure to comply with these covenants, including a failure to meet the 
financial tests or ratios, could result in an event of default and allow lenders to accelerate the debt repayment. 

Surety bonding risks 

Capstone secures its obligations for reclamation and closure costs with surety bonds provided by leading global 
insurance companies in favour of regulatory authorities in Yukon and Arizona. These surety bonds include the right 
of the surety bond provider to terminate the relationship with Capstone on providing notice of up to 90 days. The 
surety bond provider would, however, remain liable to the regulatory authorities for all bonded obligations existing 
prior to the termination of the bond in the event Capstone failed to deliver alternative security satisfactory to the 
regulator. Capstone may require substantial additional capital to accomplish its exploration and development plans 
and fund strategic growth and there can be no assurance that financing will be available on terms acceptable to 
Capstone, or at all. 

Capstone may require substantial additional financing to advance the Pinto Valley Mine, the Cozamin Mine and the 
Minto Mine to achieve designed production rates, to finance potential strategic acquisitions required for growth 

70 

 
and  to  accomplish  any  exploration  and  development  plans  for  the  Santo  Domingo  Project.  These  financing 
requirements could adversely affect Capstone’s ability to access the capital markets in the future. Failure to obtain 
sufficient financing, or financing on terms acceptable to Capstone, may result in a delay or indefinite postponement 
of exploration, development or production at one or more of our properties. Additional financing may not be 
available when needed and the terms of any agreement could impose restrictions on the operation of our business. 
Failure to raise financing when needed could have a material adverse effect on our business, financial condition, 
results of operations and prospects. 

Capstone’s ability to acquire properties for growth. 

The  life  of  any  mine  is  limited  by  its  ore  reserves.  As  we  seek  to  replace  and  expand  our  reserves  through 
exploration, acquisition of interests in new properties or of interests in companies which own the properties, we 
encounter  strong  competition  from  other  companies  in  connection  with  the  acquisition  of  properties.  This 
competition may limit our ability to adequately replace reserves.  

The sale of our metals is subject to counterparty and market risks. 

Capstone  has  entered  into  concentrate  off-take  agreements  whereby  100%  of  planned  production  of  the 
concentrate produced from the Pinto Valley, Cozamin and Minto Mines was committed to various external parties 
through calendar year 2016. Thereafter, approximately 21% is committed under contract through 2017. Capstone 
has also sold forward all of the Company’s gold and silver production from the Minto Mine and all of the silver 
production until April 2017 from the Cozamin Mine to Silver Wheaton. If any counterparty to any off-take or 
forward sales agreement does not honour such arrangement, or should any such counterparty become insolvent, 
Capstone  may  incur  losses  on  the  production  already  shipped  or  be  forced  to  sell  a  greater  volume  of  our 
production in the spot market, which is subject to market price fluctuations. In addition, there can be no assurance 
that Capstone will be able to renew any of our off-take agreements at economic terms, or at all, or that Capstone’s 
production will meet the qualitative and quantitative requirements under such agreements. 

Fluctuations in foreign currency exchange rates could have an adverse effect on Capstone’s business, financial 
condition, results of operations and prospects. 

Fluctuations in the Canadian dollar or Mexican peso relative to the US dollar could significantly affect our business, 
financial condition, results of operations and prospects. Exchange rate movements can have a significant impact on 
Capstone as all of Capstone’s revenue is received in US dollars but a portion of the Company’s operating and capital 
costs are incurred in Canadian dollars and Mexican pesos. Also, Capstone is exposed to currency fluctuations in the 
Chilean  peso  relating  to  expenditures  for  the  Santo  Domingo  Project.  As  a  result,  a  strengthening  of  these 
currencies relative to the US dollar will reduce Capstone’s profitability and affect its ability to finance its operations. 
While Capstone does not currently have any foreign currency contracts in place to hedge against currency risk, 
circumstances may arise in the future where this may be an appropriate strategy to manage costs and risks. 

General  economic  conditions or  changes  in  consumption  patterns  may  adversely  affect  Capstone’s  growth 
and  profitability. 

Many industries, including the base and precious metals mining industry, are impacted by global market conditions. 
Some of the key impacts of the recent financial market turmoil include contraction in credit markets resulting in a 
widening of credit risk, devaluations and high volatility in global equity, commodity, foreign exchange and metals 
markets, and a lack of market liquidity. A continued or worsened slowdown in the financial markets or other 
economic conditions, including, but not limited to, reduced consumer spending, increased unemployment rates, 
deteriorating business conditions, inflation, deflation, volatile fuel and energy costs, increased consumer debt 
levels, lack of available credit, changes in interest rates and changes in tax rates may adversely affect Capstone’s 
growth and profitability potential. Specifically: 

•  a global credit/liquidity issue could impact the cost and availability of financing and our overall liquidity; 
•  volatility of prices for copper, lead, zinc, gold, silver and/or molybdenum prices may impact our future 

71 

 
revenues,  profits and cash flows; 
recessionary pressures could adversely impact demand for our production; 

• 
•  volatile energy prices, commodity and consumables prices and currency exchange rates could negatively 

impact  potential production costs; and 

•  devaluation and volatility of global stock markets could impact the valuation of Capstone’s securities, 

which may impact Capstone’s ability to raise funds through future issuances of equity. 

These factors could have a material adverse effect on our business, financial condition, results of operations and 
prospects. 

Capstone’s calculations of mineral resources and mineral reserves are estimates and are subject to uncertainty. 

Our  calculations  of  mineral  resources  and  mineral  reserves  are  estimates  and  depend  upon  geological 
interpretation  and  statistical  inferences  drawn  from  drilling  and  sampling  analysis,  which  may  prove  to  be 
inaccurate. Actual recoveries of copper, lead, zinc, gold, silver and molybdenum from mineralized material may be 
lower than those indicated by test work. Any material change in the quantity of mineralization, grade or stripping 
ratio, may affect the economic viability of Capstone’s properties. In addition, there can be no assurance that metal 
recoveries in small-scale laboratory tests will be duplicated in larger scale tests under on-site conditions or during 
production. Notwithstanding pilot plant tests for metallurgy and other factors, there remains the possibility that 
the ore may not react in commercial production in the same manner as it did in testing. Mineral resources that are 
not mineral reserves do not have demonstrated economic viability. Mining and metallurgy are inexact sciences and, 
accordingly, there always remains an element of risk that a mine may not prove to be commercially viable. 

Until a deposit is actually mined and processed, the quantity of mineral resources and mineral reserves and grades 
must be considered as estimates only. In addition, the quantity of mineral resources and mineral reserves may vary 
depending on, amongst other things, metal prices, cut-off grades and operating costs. Any material change in 
quantity of mineral reserves, mineral resources, grade, percent extraction of those mineral reserves recoverable by 
underground mining techniques or the stripping ratio for those mineral reserves recoverable by open pit mining 
techniques may affect the economic viability of Capstone’s mining projects. 

We face added risks and uncertainties as a result of operating in foreign jurisdictions, including changes in 
regulation and policy. 

Capstone’s business operates in a number of foreign countries where there are added risks and uncertainties due 
to the different economic, cultural and political environments. Our mineral exploration and mining activities may 
be adversely affected by political instability and changes to government regulation relating to the mining industry. 
Other risks of foreign operations include political unrest, labour disputes and unrest, invalidation of governmental 
orders and permits, corruption, war, civil disturbances and terrorist actions, arbitrary changes in law or policies of 
particular countries (including nationalization of mines), foreign taxation, price controls, delays in obtaining or 
renewing  or  the  inability  to  obtain  or  renew  necessary  environmental  permits,  opposition  to  mining  from 
environmental or other non-governmental organizations, limitations on foreign ownership, limitations on the 
repatriation of earnings, limitations on mineral exports and increased financing costs. Local economic conditions, 
including higher incidences of criminal activity and violence in areas of Mexico can also adversely affect the security 
of  our  operations  and  the  availability  of  supplies.  In  addition,  risks  of  operations  in  Mexico  include  extreme 
fluctuations in currency exchange rates, high rates of inflation, significant changes in laws and regulations including 
but not limited to tax regulations, hostage taking and expropriation. These risks may limit or disrupt Capstone’s 
projects, reduce financial viability of local operations, restrict the movement of funds or result in the deprivation of 
contract rights or the taking of property by nationalization or expropriation without fair compensation. There can 
be no assurance that changes in the government or laws or changes in the regulatory environment for mining 
companies or for non-domiciled companies will not be made that would adversely affect Capstone’s business, 
financial condition, results of operation and prospects. 

72 

 
Differences  in  interpretation  or  application  of  tax  laws  and  regulations  or  accounting  policies  and  rules  and 
Capstone’s application of those tax laws and regulations or accounting policies and rules where the tax impact to 
the Company is materially different than contemplated.  

Resource Nationalism 

Governments in certain jurisdictions struggle with depressed economies and as a result have targeted mining 
companies for additional revenue by way of increased economic rent for the exploitation of resources in their 
countries.  Many  countries  including  Chile  and  Mexico  have  implemented  changes  to  their  respective  mining 
regimes. Future changes could include things such as, but not limited to, law affecting foreign ownership and take-
overs,  mandatory  government  participation,  taxation  and  royalties,  working  conditions,  export  duties  or 
repatriation of income or return of capital. 

Our operations are subject to significant governmental regulation, which could significantly limit our exploration 
and  production activities. 

Capstone’s mineral exploration and development activities are subject to governmental approvals and various laws 
and regulations governing development, operations, taxes, labour standards and occupational health, mine safety, 
toxic substances, land use, water use and land claims affecting local, First Nations and Aboriginal populations. The 
liabilities and requirements associated with the laws and regulations related to these and other matters may be 
costly and time- consuming and may restrict, delay or prevent commencement or continuation of exploration or 
production  operations.  We  cannot  provide  definitive  assurance  that  we  have  been  or  will  be  at  all  times  in 
compliance with all applicable laws and regulations. Failure to comply with applicable laws and regulations may 
result  in  the  assessment  of  administrative,  civil  and  criminal  penalties,  the  imposition  of  cleanup  and  site 
restoration costs and liens, the issuance of injunctions to limit or cease operations, the suspension or revocation of 
permits or authorizations and other enforcement measures that could have the effect of limiting or preventing 
production from our operations. Capstone may incur material costs and liabilities resulting from claims for damages 
to property or injury to persons arising from Capstone’s operations. If Capstone is pursued for sanctions, costs and 
liabilities  in  respect  of  these  matters,  Capstone’s  mining  operations  and,  as  a  result,  Capstone’s  financial 
performance, financial position and results of operations, could be materially and adversely affected. 

In addition, no assurance can be given that new rules and regulations will not be enacted or that existing rules and 
regulations will not be applied in a manner that could limit or curtail our exploration, development or production. 
Amendments  to  current  laws,  regulations  and  permits  governing  operations  and  activities  of  mining  and 
exploration companies, or the more stringent implementation thereof, could have a material adverse impact on 
Capstone and increase our exploration expenses, capital expenditures or production costs or reduce production at 
our producing properties or require abandonment or delays in exploring or developing our properties. 

Our operations are subject to stringent environmental laws and regulations that could significantly limit our ability 
to conduct our business. 

Our  operations  are  subject  to  various  laws  and  regulations  governing  the  protection  of  the  environment, 
exploration, development, production, taxes, labour standards, occupational health, waste disposal, safety and 
other matters. Environmental legislation provides for restrictions and prohibitions on spills, releases or emissions of 
various substances produced in association with certain mining operations, such as seepage from tailings disposal 
areas, which would result in environmental pollution. A breach of such legislation may result in the imposition of 
fines and penalties. In addition, certain of our operations require the submission and approval of environmental 
impact assessments. Environmental legislation is evolving in the direction of stricter standards and enforcement, 
higher fines and penalties for non-compliance, more stringent environmental assessments of proposed projects 
and a heightened degree of responsibility for companies and their directors, officers and employees. Compliance 
with changing environmental laws and regulations may require significant capital outlays, including obtaining 
additional permits, and may cause material changes or delays in, or the cancellation of, our exploration programs 
or current operations. 

73 

 
Capstone is required to obtain, maintain and renew environmental, construction and mining permits, which is often 
a costly, time-consuming and uncertain process. 

Mining companies, including Capstone, need many environmental, construction and mining permits, each of which 
can be time-consuming and costly to obtain, maintain and renew. In connection with our current and future 
operations, we must obtain and maintain a number of permits that impose strict conditions, requirements and 
obligations on Capstone, including those relating to various environmental and health and safety matters. To 
obtain, maintain and renew certain permits, we are required to conduct environmental assessments pertaining to 
the potential  impact  of  our  current  and future operations on the environment and  to take steps to avoid or 
mitigate those impacts. For example, additional permits will be required to fully exploit the resources at Pinto 
Valley and Minto. There is a risk that Capstone will not be able to obtain such permits or that obtaining such 
permits will require more time and capital than anticipated. 

Permit terms and conditions can also impose restrictions on how we operate and limits our flexibility in developing 
our mineral properties. Many of Capstone’s permits are subject to renewal from time to time, and renewed permits 
may contain more restrictive conditions than Capstone’s existing permits. In addition, we may be required to obtain 
new permits to expand our operations, and the grant of such permits may be subject to an expansive governmental 
review of our operations. Alternatively, we may not be successful in obtaining such permits, which could prevent 
Capstone from commencing, extending or expanding operations or otherwise adversely affect Capstone’s business, 
financial condition, results of operation and prospects. Further, renewal of our existing permits or obtaining new 
permits may be more difficult if we are not able to comply with our existing permits. Applications for permits, 
permit area expansions and permit renewals may be subject to challenge by interested parties, which can delay or 
prevent receipt of needed permits. The permitting process can also vary by jurisdiction in terms of its complexity 
and likely outcomes. 

Accordingly, permits required for Capstone’s operations may not be issued, maintained or renewed in a timely 
fashion or at all, may be issued or renewed upon conditions that restrict Capstone’s ability to operate economically, 
or may be subsequently revoked. Any such failure to obtain, maintain or renew permits, or other permitting delays 
or conditions, including in connection with any environmental impact analyses, could have a material adverse 
effect on Capstone’s business, results of operations, financial condition and prospects. 

Climatic conditions can affect our operations at the Pinto Valley, Cozamin and Minto Mines. 

Arizona  can  be  subject  to  periods  of  drought.  Operations  at the  Pinto  Valley  Mine  require  water  for  normal 
operations. Capstone has entered to a Water Supply Agreement with BHP Copper, but such agreement is subject to 
water availability and BHP’s own requirements. A lack of necessary water for a prolonged period of time could 
affect operations at the Pinto Valley Mine and materially adversely affect our results of operations. Arizona can also 
be subject to significant rainfall events which could result in flooding of pits at the Pinto Valley Mine adversely 
affecting our results of operations. 

Operations  at  the  Cozamin  Mine  are  also  subject  to  extreme  adverse  weather  conditions.  Drought  has  been 
prevalent in Central Mexico for years and the effects of lack of water might disrupt normal process operations. As a 
proactive  measure,  Cozamin  has  made  agreements  with  local  government  and  water  rights  owners  for  the 
purchase and use of water from offsite sources. 

Operations at the Minto Mine may be subject to extreme weather conditions. Unseasonable weather conditions 
may preclude normal work patterns and can severely limit Capstone’s mining operations, resulting in additional 
costs and delays. In the past, Yukon experienced extreme weather conditions that resulted in abnormally high run-
off at the Minto Mine, exceeding the normal containment capacity of the mine site. As a result, we decided to fill 
an  active mining  pit  with water,  which  caused  Capstone to cease mining operations until Capstone obtained 
regulatory permission to discharge the excess waters. Future extreme weather in Yukon could again result in excess 
run-off at the mine site, which could have an adverse effect on the results of operations at the Minto Mine and on 
our business, financial condition, results of operation and prospects. 

74 

 
Climate change is an international concern and as a result poses risk of both climate changes and government 
policy in which governments are introducing climate change legislation and treaties that could result in increased 
costs, and therefore, decreased profitability at some of our operations. 

Aboriginal title claims and rights to consultation and accommodation may affect Capstone’s existing operations as 
well as development projects and future acquisitions. 

The nature and extent of First Nations rights and title remains the subject of active debate, claims and litigation in 
Canada, including in British Columbia and Yukon. The Minto Mine lies on Category A land in Yukon where the 
Selkirk First Nation own both surface and subsurface rights. The Kutcho Project in British Columbia lies within an 
area claimed as traditional territory by both the Tahltan First Nation and the Kaska First Nation. There is a risk that 
any land claim settlement with the Tahltan or the Kaska may adversely affect Capstone’s rights to the Kutcho 
Project. There can be no guarantee that the unsettled nature of the land claims in British Columbia and Yukon will 
not create delays in project approval or unexpected interruptions in project progress, or result in additional costs to 
advance Capstone’s projects. In many cases, environmental assessment, subsequent permitting, development and 
operation of proposed projects is only possible with the support of the local First Nations group. In order to secure 
such support, we may have to take measures to limit the adverse impact to, and ensure that some of the economic 
benefits of the construction and mining activity will be enjoyed by, the local First Nations group. There is a risk that 
the  First  Nations  may  publicly  oppose  the  proposed  project  at  any  stage  and  this  potential  opposition  may 
adversely affect the project or Capstone’s public image. Further, Canadian law related to aboriginal rights, including 
aboriginal title rights, is in a period of change. There is a risk that future changes to the law may adversely affect 
Capstone’s rights to the Minto Mine.  

Land reclamation and mine closure requirements may be burdensome and costly. 

Land reclamation and mine closure requirements are generally imposed on mining companies, which require 
Capstone, amongst other things, to minimize the effects of land disturbance. Such requirements may include 
controlling the discharge of potentially dangerous effluents from a site and restoring a site’s landscape to its pre-
exploration form. The actual costs of reclamation and mine closure are uncertain and planned expenditures may 
differ from the actual expenditures required. Therefore, the amount that we are required to spend could be 
materially higher than current estimates. Any additional amounts required to be spent on reclamation and mine 
closure  may  have  a  material  adverse  effect  on  our  financial  performance,  financial  position  and  results  of 
operations and may cause Capstone to alter Capstone’s operations. Although we include liabilities for estimated 
reclamation and mine closure costs in our financial statements, it may be necessary to spend more than what is 
projected to fund required reclamation and mine closure activities. 

There are uncertainties and risks related to the potential development of the Santo Domingo Project and if 
the  construction and development of this project remains in a long-term suspension, it could adversely affect the 
Company’s  business, financial condition, results of operations and prospects. 

Development of the Santo Domingo Project will require obtaining permits and financing, and the construction and 
operation of mines,  processing  plants  and related infrastructure. Capstone has received the approval for the 
Environmental  Impact  Assessment  (“EIA”)  and  also  completed  the  tender  process  for  EPC  Engineering, 
Procurement, Construction Management (“EPCM”) packages for project development. Capstone has selected 
POSCO as the preferred EPC fixed price lump sum contractor for the Santo Domingo project. While the EPC contract 
has not been concluded, Capstone awarded a Limited Notices to Proceed to complete the verification of the 
Definitive Feasibility Study which was completed in 2016. If Capstone proceeds to development we will be subject 
to all of the risks associated with establishing new mining operations. However, due to the prevailing market 
conditions, Capstone temporarily suspended the Santo Domingo Project in 2015. As the project remains in long-
term suspension, there are risks associated with a prolonged suspension, including the timing of receipt of the 
remaining approvals and permits, changes in requirements of Governmental Authorities, the availability of key 
personnel, the availability of contractors (including POSCO), and the potential for higher costs than estimated if and 

75 

 
when Capstone decides to develop the project. These events could have a material adverse effect on Capstone’s 
financial condition, business, operating results and prospects. 

The costs, timing and complexities of developing Capstone’s projects may be greater than anticipated. 

Cost  estimates  may  increase  significantly  as  more  detailed  engineering  work  is  completed  on  a  project.  It  is 
common  in  mining  operations  to  experience  unexpected  costs,  problems  and  delays  during  construction, 
development  and  mine  start-  up.  Accordingly,  we  cannot  provide  assurance  that  our  activities  will  result  in 
profitable mining operations at our mineral properties. If there are significant delays in when these projects are 
completed and are producing on a commercial and consistent scale, or their capital costs were to be significantly 
higher than estimates, these events could have a significant adverse effect on Capstone’s results of operation, cash 
flow from operations and financial condition. 

Mineral rights or surface rights to our properties could be challenged, and, if successful, such challenges could 
have a material adverse effect on our production and our business, financial condition, results of operations and 
prospects. 

Title to Capstone’s properties may be challenged or impugned. Our property interests may be subject to prior 
unregistered agreements or transfers and title may be affected by undetected defects. Surveys have not been 
carried out on the majority of our properties and, therefore, in accordance with the laws of the jurisdiction in which 
such properties are situated, their existence and area could be in doubt. 

A claim by a third party asserting prior unregistered agreements or transfer on any of Capstone’s properties, 
especially  where  mineral  reserves  have  been  located,  could  result  in  Capstone  losing  a  commercially  viable 
property. Even if a claim is unsuccessful, it may potentially affect Capstone’s current operations due to the high 
costs of  defending  against  the  claim  and  its  impact  on  Capstone’s  resources.  Title  insurance  is  generally  not 
available for mineral properties and Capstone’s ability to ensure that Capstone has obtained a secure claim to 
individual mineral properties or mining concessions may be severely constrained. We rely on title information 
and/or representations and warranties provided by our grantors. If we lose a commercially viable property, such a 
loss could lower our future revenues or cause Capstone to cease operations if the property represented all or a 
significant portion of our mineral reserves at the time of the loss.  

It may be difficult for Capstone to find and hire qualified people in the mining industry who are situated in 
Arizona, Mexico, Yukon and Chile or to obtain all of the necessary services or expertise in Arizona, Mexico, Yukon 
and Chile or to  conduct operations on Capstone’s projects at reasonable rates. 

If qualified people and services or expertise cannot be obtained in Arizona, Mexico, Yukon and Chile, we may need 
to seek and obtain those services from people located outside of these areas, which will require work permits and 
compliance with applicable laws and could result in delays and higher costs. 

We are dependent on key management personnel. 

We are very dependent upon the personal efforts and commitment of our existing management and our current 
operations and future prospects depend on the experience and knowledge of these individuals. Capstone does not 
maintain any “key person” insurance. To the extent that one or more of Capstone’s members of management are 
unavailable  for  any  reason,  or  should  Capstone  lose  the  services  of  any  of  them,  a  disruption  to  Capstone’s 
operations could result, and there can be no assurance that Capstone will be able to attract and retain a suitable 
replacement. 

Our directors and officers may have interests that conflict with Capstone’s interests. 

Certain of Capstone’s directors and officers also serve as directors or officers, or have significant shareholdings in, 
other companies that are similarly engaged in the business of acquiring, developing and exploiting natural resource 
properties. To the extent that such other companies may participate in ventures which Capstone may participate 
in, or in ventures which Capstone may seek to participate in, our directors and officers may have a conflict of 

76 

 
interest in negotiating and concluding terms respecting the extent of such participation. In all cases where our 
directors and officers have an interest in other companies, such other companies may also compete with Capstone 
for the acquisition of mineral property investments. As a result of these conflicts of interest, we may not have an 
opportunity to participate in certain transactions, which may have a material adverse effect on our business, 
financial condition, results of operation and prospects. 

Corruption and Bribery Risk 

Capstone is required to comply with anti-corruption and anti-bribery laws of various countries including, Canada, 
US, Mexico and Chile. In recent years there has been an increase in enforcement and severity of penalties under 
such  laws.  A  company  may  be  found  liable  for  violations  by  employees,  contractors  and  third  party  agents. 
Capstone has implemented policies and taken measures including training to mitigate the risk of non-compliance, 
however, such measures are not always effective in ensuring that Capstone, its employees, contractors and third 
party agents comply strictly with such laws. If Capstone is found to be in violation of such laws, this may result in 
significant penalties, fines and/or sanctions resulting in a material adverse effect on Capstone’s reputation and 
financial results. 

Capstone’s insurance does not cover all potential losses, liabilities and damage related to Capstone’s business 
and certain risks are uninsured or uninsurable. 

In  the  course  of  exploration,  development  and  production  of  mineral  properties  and  in  the  conduct  of  our 
operations, certain risks, including rock bursts, cave-ins, fires, flooding, earthquakes and cyber-attacks may occur. It 
is not always possible to fully insure against such risks. Capstone currently does not have insurance against all risks 
and may decide not to take out insurance against all risks as a result of high premiums or other reasons. Further, 
insurance against certain risks, including those related to environmental matters, is generally not available to 
Capstone or to other companies within the mining industry. Losses from these events may cause Capstone to incur 
significant costs that could have a material adverse effect on Capstone’s business, financial condition, results of 
operation and prospects. 

Our operations will be adversely affected if we fail to maintain satisfactory labour relations. 

Our workforce is not unionized with the exception of approximately 393 of the hourly employees at the Pinto 
Valley Mine which are represented by six unions, governed by one collective bargaining agreement negotiated by 
the United Steelworkers Union which expired June 30, 2014 and is currently under negotiation. We cannot predict 
at this time whether we will be able to reach new agreements with our unionized workforce without a work 
stoppage or other labour unrest, and any such new agreements may not be on terms favourable to Capstone. 
Additional groups of non-union employees may seek union representation in the future. Further, relations with 
employees may be affected by changes in the scheme of labour relations that may be introduced by the relevant 
governmental  authorities  in  jurisdictions  where  Capstone  conducts  business.  Changes  in  such  legislation  or 
otherwise in our relationship with our employees may result in higher ongoing labour costs, employee turnover, 
strikes, lockouts or other work stoppages, any of which could have a material adverse effect on our business, 
results of operations and financial condition. 

Increased energy prices could adversely affect Capstone’s results of operations and financial condition. 

Mining operations and facilities are intensive users of electricity and carbon-based fuels. Energy prices can be 
affected by numerous factors beyond our control, including global and regional supply and demand, political and 
economic conditions, and applicable regulatory regimes. The prices of various sources of energy may increase 
significantly from current levels. An increase in energy prices for which Capstone is not hedged could materially 
adversely affect our results of operations and financial condition. 

77 

 
We may not be able to compete successfully with other mining companies. 

The mining industry  is  competitive in  all of its  phases. Capstone faces strong competition from other mining 
companies in connection with the acquisition of properties producing, or capable of producing, metals. Many of 
these companies have greater liquidity, greater access to credit and other financial resources, newer or more 
efficient equipment, lower cost structures, more effective risk management policies and procedures and/or a 
greater ability than Capstone to withstand losses. Our competitors may be able to respond more quickly to new 
laws or regulations or emerging technologies, or devote greater resources to the expansion or efficiency of their 
operations than we can. In addition, current and potential competitors may make strategic acquisitions or establish 
cooperative relationships amongst themselves or with third parties. Accordingly, it is possible that new competitors 
or alliances amongst current and new competitors may emerge and gain significant market share to our detriment. 
Capstone  may  also  encounter  increasing  competition  from  other  mining  companies  in  our  efforts  to  hire 
experienced  mining  professionals.  Increased  competition  could  adversely  affect  Capstone’s  ability  to  attract 
necessary  capital  funding,  to  acquire  it  on  acceptable  terms,  or  to  acquire  suitable  producing  properties  or 
prospects for mineral exploration in the future. As a result of this competition, we may not be able to compete 
successfully against current and future competitors, and any failure to do so could have a material adverse effect 
on our business, financial condition, results of operations and prospects. 

Capstone may experience difficulties with Capstone’s joint venture partners. 

Capstone currently operates the Santo Domingo Project through a joint ownership arrangement with KORES and 
may in the future enter into additional joint ownership arrangements with other partners. Capstone is subject to 
the risks normally associated with the conduct of joint ownership arrangements, which include disagreements with 
Capstone’s partners on how to develop, operate and finance Capstone’s joint ownership activities, including future 
acquisitions  or  the  Santo  Domingo  Project,  and  possible  disputes  with  Capstone’s  partners  regarding  joint 
ownership arrangement matters. These disagreements and disputes may have an adverse effect on Capstone’s 
ability to successfully pursue joint ownership arrangements, including the development of the Santo Domingo 
Project, which could affect our business, financial condition, results of operation and prospects. 

Capstone may experience problems integrating new acquisitions into Capstone’s existing operations. 

Capstone’s success at completing acquisitions will depend on a number of factors, including, but not limited to, 
identifying acquisitions that fit Capstone’s strategy, negotiating acceptable terms with the seller of the business or 
property to be acquired and obtaining approval from regulatory authorities in the jurisdictions of the business or 
property to be acquired. Any positive effect on Capstone’s results from Capstone’s acquisitions will depend on a 
variety of factors, including, but not limited to, assimilating the operations of an acquired business or property in a 
timely and efficient manner, maintaining Capstone’s financial and strategic focus while integrating the acquired 
business or property, implementing uniform standards, controls, procedures and policies at the acquired business, 
as appropriate, and to the extent that Capstone makes an acquisition outside of markets in which Capstone has 
previously operated, conducting and managing operations in a new operating environment. The Pinto Valley Mine 
was acquired on an “as is where is” basis with limited representations and warranties. In addition, Capstone has 
provided indemnities to BHP Copper with respect to certain liabilities and have limited recourse against BHP 
Copper with respect to many potential liabilities related to the Pinto Valley Mine. As a result, the acquisition of 
mineral  properties,  such  as  the  Pinto  Valley  Mine,  may  subject  Capstone  to  unforeseen  liabilities,  including 
environmental liabilities. 

Capstone may experience cybersecurity threats 

We rely on secure and adequate operations of information technology systems in the conduct of our operations. 
Access to and security of the information technology systems are critical to our operations. To our knowledge, we 
have not experienced any material losses relating to disruptions to our information technology systems. We have 
enhanced and implemented ongoing policies, controls and practices to manage and safeguard Capstone and our 
stakeholders from internal and external cybersecurity threats and to comply with changing legal requirements and 

78 

 
industry practice. Given that cyber risks cannot be fully mitigated and the evolving nature of these threats, we 
cannot assure that our information technology systems are fully protected from cybercrime or that the systems will 
not be inadvertently  compromised, or  without failures or defects. Disruptions to our information technology 
systems, including, without limitation, security breaches, power loss, theft, computer viruses, cyber-attacks, natural 
disasters, and non- compliance by third party service providers and inadequate levels of cybersecurity expertise 
and safeguards of third party information technology service providers, may adversely affect the operations of 
Capstone  as  well  as  present  significant  costs  and  risks  including,  without  limitation,  loss  or  disclosure  of 
confidential, proprietary, personal or sensitive information and third party data, material adverse effect on our 
financial performance, compliance with our contractual obligations, compliance with applicable laws, damaged 
reputation, remediation costs, potential litigation, regulatory enforcement proceedings and heightened regulatory 
scrutiny. 

Legal Proceedings 

From  time  to  time,  Capstone  is  involved  in  routine  legal  matters,  including  but  not  limited  to,  regulatory 
investigations, claims, lawsuits and other proceedings in the ordinary course of our business. There can be no 
assurances that these matters will not have a material effect on our business. 

5 – DIVIDENDS AND DISTRIBUTIONS 

We have not declared or paid any dividends or distributions on our common shares in the last three financial years 
and have no present intention of doing so, as we anticipate that all available funds will be invested to finance the 
growth of our business. 

6 – DESCRIPTION OF CAPITAL STRUCTURE 

6.1 

General Description of Capital Structure 

Capstone has an authorized capital of an unlimited number of common shares without par value, 391,310,079 of 
which were issued and outstanding as of March 13, 2017. 

Common Shares 

The holders of the common shares are entitled to receive notice of and to attend and vote at all meetings of the 
shareholders of Capstone and  each  common share confers the right to one vote in person or by proxy at all 
meetings of the shareholders. The holders of the common shares, subject to the prior rights, if any, of the holders 
of any other class of shares of Capstone, are entitled to receive such dividends in any financial year as the Board of 
Directors of Capstone may determine. In the event of liquidation, dissolution or winding-up of Capstone, whether 
voluntary or involuntary, the holders of the common shares are entitled to receive, subject to the prior rights, if 
any, of the holders of any other class of shares, the remaining property and assets of Capstone. 

79 

 
 
 
7 – MARKET FOR SECURITIES 

Trading Price and Volume – Common Shares 

Our common shares are listed for trading on the TSX under the symbol “CS”. The following table sets out the 
monthly price ranges and volumes of Capstone common shares on the TSX during the 12 months ended December 
31, 2016 and up to the date of this Annual Information Form: 

Month 
March 2017* 
February 2017 
January 2017 
December 2016 
November 2016 
October 2016 
September 2016 
August 2016 
July 2016 
June 2016 
May 2016 
April 2016 
March 2016 
February 2016 
January 2016 

Volume 
10,040,237 
33,198,094 
23,721,756 
26,983,181 
40,508,515 
16,855,296 
12,868,466 
19,524,483 
17,099,869 
13,733,309 
13,489,177 
33,774,270 
32,121,017 
32,640,805 
37,993,936 

High (C$) 
1.75 
1.81 
1.52 
1.40 
1.15 
0.83 
0.81 
0.89 
0.97 
0.86 
082 
0.89 
0.62 
0.42 
0.45 

Low (C$) 
1.29 
1.43 
1.23 
1.00 
0.81 
0.68 
0.65 
0.65 
0.77 
0.64 
0.60 
0.44 
0.40 
0.32 
0.27 

* includes data from March 1 to March 13, inclusive.  Source: 
Bloomberg 

80 

 
8 – DIRECTORS AND OFFICERS 

8.1 

Name and Occupation 

As of the date of this AIF, the directors and executive officers of Capstone are as follows: 

Name and Address 

Lawrence I. Bell[2][3] 
British Columbia, 
Canada 
George L. Brack[2][4] 
British Columbia, 
Canada 

Robert J. 
Gallagher[3] 
British Columbia, 
Canada 
Jill V. Gardiner[2][5] 
British Columbia,  
Canada 

Soon Jin (Alex) Kwon[6]
Ontario, Canada 

Kalidas 
Madhavpeddi[4][5] 
Arizona, US 

Dale C. Peniuk[2][4][5] 
British Columbia, 
Canada 

Darren M. Pylot 
British Columbia, 
Canada 
Richard N. Zimmer[3][4] 
British Columbia,   
Canada 

Office  held 
with Capstone 
Director 

Chairman and 
Director 

Principal  Occupation 
during past five years 
A  director  of  Silver  Wheaton  Corp.;  previously 
Chair  of  Canada  Line  Rapid  Transit  Project  and 
Chair of BC Hydro. 
Currently  the  Chairman  of  Capstone;  and  a 
director  of  Geologix  Explorations  Inc,  Silver 
Wheaton Corp. and Timmins  Gold Corp. 

Director Since[1]

November 24, 2008 

May 19, 2009 

Director 

Director 

Director 

Director 

Director 

President 
and CEO 
and Director 
Director 

A director of New Gold Inc., Dynasty Gold Corp., 
Southern  Arc  Minerals  Inc.  and  Japan  Gold 
Corp.; former President & CEO of New Gold Inc. 

November 1, 2016 

Financial  consultant  and  corporate  director;  a 
director  of  Capital  Power  Corporation  and 
Parkbridge Lifestyle Communities Inc.; previously 
served  as  a  director  of  SilverBirch  Hotels  & 
Resorts and Timber Investments Ltd.; and served 
as chair of the board for Turquoise Hill Resources 
Ltd. until December 2016. 

Director & Chief Operating Officer of KORES Canada 
Corporation,  a  wholly owned  subsidiary of  Korea 
Resources Corporation since 2013. 
President, Azteca Consulting LLC from 2006; advisor 
to China Molybdenum Co. Ltd. from 2008; currently 
a  director  of  Trilogy  Metals 
(formerly 
Novacopper Inc.) and NovaGold Resources Inc.; and 
served  as  a  director  of  Namibia  Rare  Earths  Inc. 
until November 2016. 

Inc. 

Chartered Professional Accountant (CPA, CA) and 
corporate director; a director of Argonaut Gold  Inc. 
and  Lundin  Mining  Corporation;  previously  a 
Partner with KPMG LLP Chartered Accountants. 
President and CEO of the Company and a director 
of  the  Company  since  October  2003;  currently a 
director of Zena Mining Corp. 
A director of Alexco Resource Corp.   

November 1, 2016 

April 29, 2015 

June 1, 2012 

May 19, 2009 

October 23, 2003 

June 20, 2011 

[1]  Each director is appointed for a term of one year, which expires on the date of the annual meeting of shareholders of Capstone 

following his or her appointment. Capstone’s next annual meeting is scheduled to be held on April 26, 2017. 

[2] Member of the Human Resource & Compensation Committee 
[3] Member of the Technical, Health, Environmental, Safety & Sustainability Committee 
[4] Member of the Corporate Governance & Nominating Committee 
[5] Member of the Audit Committee 

81 

 
 
 
 
Name and Address 

Cindy L. Burnett 
British Columbia, 
Canada 

Office held 
with Capstone 
Vice President, Investor Relations and 
Communications 

Principal  Occupation 
during past five years 

Vice  President, 
Investor  Relations  and 
Communications  since  September  2012  and 
Vice President, Investor Relations from March 
2011 to September 2012.  

Gregg B. Bush 
British Columbia, 
Canada 
Jason P. Howe 
British Columbia, 
Canada 

Wendy A. King 
British Columbia, 
Canada 

Senior Vice President and Chief Operating 
Officer 

Senior Vice President and Chief Operating 
Officer since May 2010. 

Vice President, Corporate Development 

Vice-President, Legal, Risk and Governance 

and Corporate Secretary 

Vice President, Corporate Development since 
October  2016;  previously  Vice  President, 
Business  Development  from  March  2009  to 
October 2016; President & CEO of Zena Mining 
since 2008. 

Vice President, Legal, Risk and Governance since 
February 2014 and Corporate  Secretary since 
March 2015; previously Senior  Vice President 
Government Relations, General  Counsel, Chief 
Compliance Officer and  Corporate Secretary for 
Central  1  Credit  Union  from  March  2012  to 
February  2014;  Senior  Legal  Counsel  and 
Assistant Corporate Secretary for Weyerhaeuser 
Company Limited  from 2001 to 2012. 

Gillian A. McCombie 
British Columbia, 
Canada 

Vice  President, 
Human Resources 

Vice President,  Human  Resources  since  March 
2013; previously, Director of Human Resources 
from December 2011 to March 2013. 

Brad J. Mercer 
Alberta, Canada 

D. James Slattery 
British Columbia,  
Canada 

Senior Vice President, Exploration 

Senior Vice President and Chief Financial 
Officer 

Senior Vice President, Exploration since March 
2013, Vice President, Exploration for Capstone 
from November 2008 to March 2013. 
Senior  Vice  President  and  Chief  Financial 
Officer  since  July  2013;  previously  Vice 
President and Chief Financial Officer of Inmet 
Mining  Corporation  from  July  2005  to  April 
2013. 

Note: Guy Lebel held the position of Vice President, Evaluations from April 15, 2013 to January 11, 2016; Robert S. Blusson held the position of Vice President, Finance from 
January 1, 2013 to October 3, 2016; Peter T. Hemstead held the position of Treasurer from January 1, 2009 to October 3, 2016 and Vice President, Marketing from March 1, 
2010 to October 3, 2016; Tomas Iturriaga held the position of Vice President, North American Operations from August 1, 2015 to February 2, 2017.  

82 

 
 
Ownership of Securities by Directors and Officers 

As at March 13, 2017, the directors and executive officers as a group beneficially owned or exercised control or 
direction  over,  directly  or  indirectly,  an  aggregate  of  2,837,766  Capstone  common  shares,  representing 
approximately 0.76% of the issued and outstanding common shares of Capstone. 

To the knowledge of Capstone, after reasonable enquiry, no director or officer of Capstone is, as at the date of this 
Annual Information Form, or was within 10 years before the date of this Annual Information Form, a director, chief 
executive officer or chief financial officer of any company that: (a) was subject to a cease trade order, an order 
similar to a cease trade order, or an order that denied the relevant company access to any exemption under 
securities legislation, that was in effect for a period for more than 30 consecutive days (together, an “order”),that 
was issued while the director or officer was acting in the capacity as director, chief executive officer or chief 
financial officer; or (b) was subject to an order that was issued after the director or officer ceased to be a director, 
chief executive officer or chief financial officer and which resulted from an event that occurred while that person 
was acting in the capacity as director, chief executive officer or chief financial officer. 

To the knowledge of Capstone, after reasonable enquiry, no director or officer of Capstone, or a shareholder 
holding a sufficient number of securities of Capstone to affect materially the control of Capstone: (a) is as at the 
date of this Annual Information Form, or has been within the 10 years before the date of this Annual Information 
Form, a director or officer of any company that, while that person was acting in that capacity, or within a year of 
that person was acting in that  capacity, became bankrupt, made a proposal under any  legislation  relating to 
bankruptcy  or  insolvency  or  was  subject  to  or  instituted  any  proceedings,  arrangement  or  compromise  with 
creditors or had a receiver, receiver manager or trustee appointed to hold its assets; or (b) has, within the 10 years 
before the date of this Annual Information Form, become bankrupt, made a proposal under any legislation relating 
to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangement or compromise with 
creditors, or had a receiver, receiver manager or trustee appointed to hold the assets of the director, executive 
officer or shareholder. 

To the knowledge of Capstone, after reasonable enquiry, no director or officer of Capstone, or a shareholder 
holding a sufficient number of securities of Capstone to affect materially the control of Capstone has been subject 
to any penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory 
authority or has entered into a settlement agreement with a securities regulatory authority, or any other penalties 
or sanctions imposed by a court or regulatory body that would likely be considered important to a reasonable 
investor in making an investment decision. 

8.2 

Conflicts of Interest 

Certain  of  our  directors  and  officers  serve  or  may  agree  to  serve  as  directors  or  officers  of  other  reporting 
companies, including public companies as noted in 8.1 above, or have significant shareholdings in other reporting 
companies and, to the extent that such other companies may participate in ventures in which we may participate, 
our directors may have a conflict of interest in negotiating and concluding terms respecting the extent of such 
participation. In the event that such a conflict of interest arises at a meeting of our directors, a director who has a 
conflict abstains from voting for or against the approval of such participation or such terms and such director will 
not participate in  negotiating  and  concluding terms of any proposed transaction. From time to time, several 
companies may participate in the acquisition, exploration and development of natural resource properties thereby 
allowing for their participation in larger programs, permitting involvement in a greater number of programs and 
reducing financial exposure in respect of any one program. It may also occur that a particular company will assign 
all or a portion of its interest in a particular program to another of these companies due to the financial position of 
the company making the assignment. Under the laws of the Province of British Columbia, the directors of Capstone 
are required to act honestly, in good faith and in the best interests of Capstone. In determining whether or we will 

83 

 
participate in a particular program and the interest we will acquired, the directors will primarily consider the 
degree of risk to which we may be exposed and our financial position at that time. See also “Risk Factors”. 

9 – AUDIT COMMITTEE INFORMATION 

9.1 

Audit Committee Terms of Reference 

The full text of our Audit Committee Terms of Reference is included as Schedule “A” to this Annual Information 
Form. 

9.2 

Composition of the Audit Committee and Relevant Education and Experience 

Our Audit Committee consists of three members all of whom are independent and financially literate as defined by 
National Instrument 52-110 - Audit Committees (“NI 52-110”). The name, relevant education and experience of 
each Audit Committee member is outlined below: 

Dale C. Peniuk (Chair) 

Mr. Peniuk is a Chartered Professional Accountant CPA, CA and corporate director. In addition to Capstone, Mr. 
Peniuk currently serves on the Board and as Audit Committee Chair of Lundin Mining Corporation and Argonaut 
Gold Inc. and has been on the board and chair of the audit committee of numerous other Canadian public mining 
companies since 2006. Mr. Peniuk obtained a B.Comm from the University of British Columbia in 1982 and his 
Chartered  Accountant  designation  from  the  Institute  of  Chartered  Accountants  of  British  Columbia  (now  the 
Chartered Professional Accountants of British Columbia) in 1986, and spent more than 20 years with KPMG LLP, 
Chartered Accountants (now KPMG LLP, Chartered Professional Accountants) and predecessor firms, the last 10 of 
which as an assurance partner with a focus on mining companies. 

Jill V. Gardiner 

Ms. Gardiner is a corporate director and has a financial consulting practice. She is currently a director of Capital 
Power Corporation and Parkbridge Lifestyle Communities Inc. Previously, Ms. Gardiner spent over 20 years in the 
investment banking industry, most recently as Managing Director and Regional Head, British Columbia, for RBC 
Capital Markets. She also held various positions in corporate finance, mergers and acquisitions and debt capital 
markets as well as serving as Head of the Forest Products Group and Head of the Global Utilities Group. Prior to 
joining the investment banking industry, Ms. Gardiner was Senior Project Manager at the Ontario Energy Board and 
was also a lecturer at the University of Victoria, School of Business. Ms. Gardiner has an MBA and BSc from Queen’s 
University. Ms. Gardiner has extensive experience analyzing and evaluating financial statements as both a director 
and as Managing Director or RBC Capital Markets. 

Kalidas Madhavpeddi 

Mr. Madhavpeddi is President of Azteca Consulting LLC and also an advisor to China Molybdenum Inc., a former 
Senior Vice President of Business Development at Phelps Dodge Corporation, former President of Phelps Dodge 
Wire  and  Cable  and  Senior  Vice  President  of  Phelps  Dodge  Sales  Company  and  other  various  technical  and 
engineering positions. He holds a M.S., Industrial Management and Engineering from the University of Iowa, and a 
B.S., Civil Engineering  from  the  Indian Institute of Technology in Madras, India and completed the Advanced 
Management Program at Harvard Business School. Mr. Madhavpeddi has extensive experience analysing and 
evaluating financial statements as both a director and senior vice president of public companies. 

9.3 

Audit Committee Oversight 

At no time since the commencement of our most recently completed financial year was a recommendation of the 
Committee to nominate or compensate an external auditor not adopted by the Board of Directors. 

84 

 
9.4 

Pre-Approval Policies and Procedures 

The Audit Committee pre-approves all non-audit services provided by our external auditor and has established 
policies and procedures accordingly. When a new service is proposed by Capstone’s external auditor, management 
confirms with the audit engagement partner that there is no independence concern related to the proposed 
service. Once it is confirmed by the audit engagement partner and the Chair of Audit that the proposed service(s) 
would not impair the auditor’s independence, the matter is raised to the Audit Committee for approval before 
management proceeds with engaging the external auditor to perform the proposed service(s). 

9.5 

External Auditors Service Fees (By Category) 

The aggregate fees billed by our external auditors in the last two fiscal years ended December 31, 2016 and 2015 are 
as  follows: 

Year Ending 

Audit Fees(1)

December 31, 2016 

C$944,000 

December 31, 2015 

C$856,000 

Audit-Related 
Fees 

nil 

nil 

Tax Fees(2)

C$140,000 

C$109,600 

All Other 
Fees(3)

C$43,000 

C$121,910 

(1)  This amount includes the fees billed for the audit of the annual consolidated financial statements and for the review of the Interim condensed 
consolidated financial statements. In previous years, interim review fees were disclosed in the “Audit-related fees” category, these fees are shown 
within the “Audit fees” category for both years shown above.  

(2)  The aggregate fees billed for professional services rendered for tax compliance, tax advice and tax planning. All fees for tax compliance, tax 

advance and tax planning  must be approved by the Audit Committee. 

(3)  The aggregate fees billed that are not “Audit Fees”, “Audit-Related Fees” or “Tax Fees”. These fees in 2015 and 2016 relate primarily to IT advisory 

services. All fees for other professional services must be approved by the Audit Committee. 

10 – LEGAL PROCEEDINGS AND REGULATORY ACTIONS 

Legal Proceedings 

Capstone was not subject to any material legal proceedings throughout the recently completed financial year. 
Capstone is, from time to time, involved in legal claims, proceedings and complaints arising in the ordinary course 
of business. While the outcome of these legal proceedings cannot be predicted with certainty, we believe that any 
adverse  decision  in  such  proceedings  or  complaints  will  not  have  a  material  adverse  effect  on  the  financial 
condition or operations of Capstone. The directors and the management know of no contemplated or pending 
proceedings against anyone that might materially adversely affect our financial condition or results of operations. 

Regulatory Actions 

On December 21, 2015, the Yukon government reassessed Minto Explorations Ltd.’s 2014 annual royalty return and 
notwithstanding Minto’s disagreement with  the 2014 reassessment, Minto has paid the  claimed penalty and 
interest within the required time period for the 2014 reassessment. Minto continues to work with the Yukon 
government to resolve the reassessment, inclusive of the impact on the 2010-2013 years. It is not possible to 
estimate the amount of the reassessed royalty until the Yukon government has completed the reassessments, 
however we do not anticipate that it will have a material impact on the Company. 

Other than the assessment noted above, as of December 31, 2016, Capstone is not subject to: 

•  any penalties or sanctions imposed against Capstone by a court relating to securities legislation or by a 

securities regulatory authority during the financial year ended December 31, 2016; or 

•  any other penalties or sanctions imposed by a court or regulatory body against Capstone that would likely 

• 

be considered important to a reasonable investor in making an investment decision; or 
settlement agreements Capstone entered into before a court relating to securities legislation or with a 
securities regulatory authority during the financial year ended December 31, 2016. 

85 

 
 
 
 
11 – INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS 

Except as otherwise disclosed herein, no director, executive officer or principal shareholder of Capstone, or any 
associate or affiliate of the foregoing, have had any material interest, direct or indirect, in any transaction within 
the three most recently completed financial years or during the current financial year prior to the date of this 
Annual Information Form that has materially affected or will materially affect Capstone. 

12 – TRANSFER AGENT AND REGISTRAR 

Computershare Investor Services Inc., at 3rd Floor, 510 Burrard Street, Vancouver, British Columbia V6C 3B9, is the 
transfer agent and registrar of our common shares, and Computershare Investor Services Inc., at 11th Floor, 100 
University Avenue, Toronto, Ontario M5J 2Y1, is the co-transfer agent and registrar. 

13 – MATERIAL CONTRACTS 

Material contracts, other than contracts entered into in the ordinary course of business, that were entered into by 
Capstone between January 1, 2016 and as of the date of this AIF, or before that time, but that are still in effect are 
listed below: 

1.  Shareholders’ Agreement between the Company, KORES, Korea Chile Mining Corporation and 0908113 BC 
Ltd.  dated June 17, 2011 with respect to the ownership of the Santo Domingo Project. This agreement 
governs the  conduct of the business and affairs of 0908113 B.C. Ltd. and the relationship of the parties, 
and  provides  restrictions  on  transfer  of  title  and  ownership  of  shares.  A  copy  of  the  Shareholders’ 
Agreement is available on  SEDAR at www.sedar.com. 

2.  Third Amended and Restated Credit Agreement between Capstone, The Bank of Nova Scotia, Canadian 
Imperial  Bank of Commerce, Wells Fargo Bank N.A., Canadian Branch, Citibank, N.A., Canadian Branch, 
Export  Development Canada, Bank of Montreal, Mizuho Bank, Ltd., and ING Capital LLC., dated January 16, 
2015  (the  “RCF”). The RCF originally comprised a committed $440 million plus a $60 million accordion. 
Capstone chose to permanently reduce the credit available under the RCF by $20 million in the fourth quarter of 
2016, and again reduced the credit available by another $20 million early in the first quarter of 2017, thereby 
permanently reducing the credit available under the RCF to $400 million as of the date of this AIF. The RCF has a 
four year term  maturing in January 2019 and may be extended on mutual consent, an interest rate of US 
LIBOR plus 2.50% to  3.50% and a standby fee of 0.5625% to 0.7875%, payable on the undrawn  balance of 
the facility, depending on the quarterly total leverage ratio. The $60 million accordion may be exercised 
by  Capstone  once  additional  credit  is  committed from existing or new lenders. A copy of the RCF is 
available on SEDAR at www.sedar.com. 

14 – INTERESTS OF EXPERTS 

14.1  Names of Experts 

Deloitte LLP, Chartered Professional Accountants (“Deloitte”), have prepared an auditors’ report dated February 
15, 2017, on Capstone’s annual consolidated financial statements as of and for the years ended December 31, 2016 
and  December  31,  2015  which  have  been  filed  on  SEDAR.  Deloitte  have  confirmed  they  are  independent  of 
Capstone within the meaning of the Rules of Professional Conduct of the Chartered Professional Accountants of 
British Columbia. 

The following persons or companies have prepared or certified a statement, report or valuation in this Annual 
Information Form, either directly or in a document incorporated by reference, and whose profession or business 
gives  authority  to  the  statement,  report  or  valuation  made  by  the  person  or  company:  Dave Hallman,  PE, 
Diego Airo, P.Eng., Jenna Hardy, P.Geo., Jeremy Vincent, P.Geo., Kenneth Major, P.Eng., Mel Lawson, SME-RM, 
Patrick Andrieux, P.Eng., Vivienne McLennan, P.Geo., Bill Hodgson, P.Eng., Bruce Murphy, P.Eng., Colleen Roche, 
P.Eng., Douglas McIlveen, P.Geo., John Eggert, P.Eng., Michael Levy, PE, Kevin Cymbalisty, P.Eng., Pooya Mohseni, 

86 

 
 
P.Eng., Wayne Barnett, Pr.Sci.Nat, Carolla Hoag, CPG, SME-RM, Garth Kirkham, P.Geo., FGC, Patricia Maloney, P.E., 
John Marek, PE, Tony Freiman, PE, Anna Klimek, P.Eng., Carlos Guzman, F.AusIMM, David Frost, F.AusIMM, David 
W. Rennie, P.Eng., Hans Gopfert, P.Eng., Joyce Maycock, P.Eng., Roy Betinol, P.Eng., Tom Kerr, P.Eng., and Vikram 
Khera, P.Eng. 

14.2 

Interests of Experts 

To the knowledge of Capstone, after reasonable enquiry, except for Jenna Hardy, Douglas McIlveen, Vivienne 
McLennan, Kevin Cymbalisty, Pooya Mohseni, Diego Airo, and Jeremy Vincent, none of the experts named under 
“Names of Experts”, when or after they prepared the statement, report or valuation, has received or holds any 
registered or beneficial interests, direct or indirect, in any securities or other property of Capstone or of one of 
Capstone’s associates or affiliates (based on information provided to us by the experts) or is or is expected to be 
elected, appointed or employed as a director, officer or employee of Capstone or of any of our associates or 
affiliates. Vivienne McLennan, Diego Airo, and Jeremy Vincent are employees of Capstone, and Douglas Mcllveen, 
Kevin Cymbalisty, and Pooya Mohseni are employees of Minto Explorations Ltd. Each of the experts noted in this 
section 14.2 beneficially owns, directly or indirectly, less than one percent of the outstanding common shares of 
the Company. 

15 – ADDITIONAL INFORMATION 

Additional information relating to Capstone may be found on SEDAR at www.sedar.com, including financial and other 
information in our consolidated financial statements and management’s discussion and analysis for the year ended 
December 31, 2015, under “Capstone Mining Corp.” 

Additional information, including directors’ and officers’ remuneration and indebtedness, principal holders of 
Capstone’s securities, and securities authorized for issuance under equity compensation plans is contained in 
Capstone’s Information Circular for our most recent annual general meeting of security holders that involved the 
election of directors. 

87 

 
SCHEDULE A 

AUDIT COMMITTEE 

TERMS OF REFERENCE 

1.  PURPOSE 

The overall purpose of  the  Audit  Committee of Capstone Mining Corp. (“Capstone”) is to assist the Board of 
Directors (the “Board”) in fulfilling its oversight responsibilities related to the quality and integrity of financial 
reporting, including ensuring fair presentation of the financial position and results of operations of Capstone in 
accordance with Canadian generally accepted accounting principles. The Audit Committee will also ensure that 
management has designed and implemented an effective system of internal financial controls and review their 
compliance  with  regulatory  and  statutory  requirements  as  they  relate  to  consolidated  financial  statements, 
taxation matters and disclosure of material facts. 

2.  COMPOSITION 

A.  The Audit Committee shall consist of at least three members of the Board, all of whom shall be 
“independent directors”, as that term is defined in National Instrument 52-110, “Audit Committees”. 

B.  The Board, at its organizational meeting held in conjunction with each annual general meeting of the 
shareholders, shall appoint the members of the Audit Committee for the ensuing year. The Board 
may at any time remove or replace any member of the Audit Committee and may fill any vacancy in 
the Audit Committee. 

C.  The Board shall have appointed the chair of the Audit Committee on an annual basis. 

D.  All  of  the  members  of  the  Audit  Committee  shall  be  “financially  literate”  (i.e.  able  to  read  and 
understand a set of financial statements that present a breadth and level of complexity of the issues 
that can reasonably be expected to be raised by Capstone’s consolidated financial statements). 

E.  The  secretary  of  the  Audit  Committee  shall  be  designated  from  time  to  time  from  one  of  the 
members of the Audit Committee or, failing that, shall be the Corporate Secretary, unless otherwise 
determined by the Audit Committee. 

F.  The quorum for meetings shall be a majority of the members of the Audit Committee, present in 
person or by telephone or other telecommunication device that permits all persons participating in 
the meeting to speak and to hear each other. 

3.  CORE RESPONSIBILITIES 

A.  The overall duties and responsibilities of the Audit Committee shall be as follows: 

i.  To assist the Board in the discharge of its responsibilities relating to accounting principles, 
reporting  practices  and  internal  controls  and  its  approval  of  Capstone’s  annual  and 
quarterly consolidated financial statements; 

ii.  To ensure that management has designed, implemented and is maintaining an effective 

system of internal financial controls; and 

iii.  To report regularly to the Board on the fulfilment of its duties and responsibilities. 

B.  The duties and responsibilities of the Audit Committee as they relate to the external auditors shall, in 
general, be to oversee the work of the external auditors engaged for the purpose of preparing or 
issuing an auditor’s report or performing other audit, review or attest services for Capstone, including 

A 

 
 
C.  the resolution of disagreements between management and the external auditor regarding financial 

reporting. Specifically, these duties and responsibilities include the following: 

i.  To recommend to the Board a firm of external auditors to be engaged by Capstone, and 

to consider the independence of such external auditors; 

ii.  To review and pre-approve the audit and any other services rendered by the external 

auditors and review the fee, scope and timing of these services; 

iii.  To review the audit plan of the external auditors prior to the commencement of the audit; 

iv.  To review with the external auditors, upon completion of their audit, the following: 

a)  content of their report to the Audit Committee; 

b)  scope and quality of the audit work performed; 

c)  adequacy of Capstone’s financial and auditing personnel; 

d)  co-operation received from Capstone’s personnel during the audit; 

e)  significant transactions outside of the normal business of Capstone; 

f)  significant proposed adjustments and recommendations for improving internal 

accounting controls, accounting principles or management systems; 

g)  any significant changes to their audit plan; and 

h)  any serious difficulties or disputes with management encountered during the 

audit; 

v.  To  discuss  with  the  external  auditors  the  quality  and  not  just  the  acceptability  of  accounting 

principles; 

vi.  To implement structures and procedures to ensure that the Audit Committee meets the external 

auditors on a regular basis in the absence of management; 

vii. To review the performance of the external auditors, making recommendations to the auditors, to 

management and/or to the Board as appropriate; and 

viii. To review and approve hiring policies for employees or former employees of the past and present 

external auditors. 

D.  The  duties  and  responsibilities  of  the  Audit  Committee  as  they  relate  to  the  internal  control 

procedures are to: 

i.  Review and approve the internal control assessment plan; 

ii.  Review  any  significant  findings  and  recommendations,  and  management’s  response 

thereto; 

iii.  Review the appropriateness and effectiveness of the policies and business practices which 
impact on the financial integrity of Capstone, including those relating to internal auditing, 
insurance,  accounting,  information  services  and  systems  and  financial  controls, 
management reporting and risk management; 

iv.  Review any unresolved issues between management and the external auditors that could 

affect the financial reporting or internal controls; 

 
 
 
v.  Review  all  material  written  communications  between  the  external  auditors  and 

management; and 

vi.  Periodically  review  the  financial  and  auditing  procedures  and  the  extent  to  which 
recommendations made by the internal audit staff or by the external auditors have been 
implemented. 

E.  The Audit Committee is also charged with the responsibility to: 

i.  Review the quarterly financial statements and associated MD&A and earnings release and 

recommend approval to the Board with respect thereto; 

ii.  Review and approve the financial sections of: 

a)  the annual report to shareholders; 

b)  the annual information form; 

c)  prospectuses and other offering documents; and 

d)  other public reports requiring approval by the Board and report to the Board with 

respect thereto; 

iii.  Review  regulatory  filings  and  decisions  as  they  relate  to  the  consolidated  financial 

statements; 

iv.  Review the appropriateness of the policies and procedures used in the preparation of the 
consolidated financial statements and other required disclosure documents, and consider 
recommendations for any material change to such policies; 

v.  Review and report on the integrity of the consolidated financial statements; 

vi.  Review the minutes of any audit committee meetings of subsidiary companies; 

vii.  Review with management, the external auditors and, if necessary, with legal counsel, any 
litigation, claim or other contingency, including tax assessments that could have a material 
effect  upon  the  financial  position  or  operating  results  and  the  manner  in  which  such 
matters have been disclosed in the consolidated financial statements; 

viii. Review  the  compliance  with  regulatory  and  statutory  requirements  as  they  relate  to 

consolidated financial statements, tax matters and disclosure of material facts; 

ix.  Review with management the policies and procedures with respect to officers’ expense 
accounts and perquisites, including their use of corporate assets, and consider the results 
of any review of these areas by the external auditors; 

x.  Receive a report annually from management of all accounting firms employed, other than 
the principal external auditors, with such report to include the nature of the services 
performed and the fees charged; 

xi.  Develop  a  calendar  of  activities  to  be  undertaken  by  the  Audit  Committee  for  each 
ensuing year and to submit the calendar in the appropriate format to the Board following 
each annual general meeting of shareholders; 

xii.  Establish and periodically review procedures for: 

 
 
 
a)  the receipt, retention and treatment of complaints received regarding accounting, 

internal accounting controls, or auditing matters; and 

b)  the  confidential,  anonymous  submission  by  employees  of  concerns  regarding 

questionable accounting or auditing matters; and 

xiii. Review the adequacy of the Terms of Reference annually, proposing modifications as 

appropriate. 

4.  RESPONSIBILITIES OF THE COMMITTEE CHAIR 

The fundamental responsibility of the Audit Committee Chair is to be responsible for the management and effective 
performance  of  the  Audit  Committee  and  provide  leadership  to  the  Audit  Committee  in  fulfilling  its  core 
responsibilities and any other matters delegated to it by the Board. To that end, the Audit Committee Chair’s 
responsibilities shall include: 

A.  Working with the Chairman of the Board, the Chief Financial Officer and the Corporate Secretary to 

establish the frequency of the Audit Committee meetings; 

B.  Providing leadership to the Audit Committee and presiding over Audit Committee meetings; 

C.  Facilitating the flow of information to and from the Audit Committee and fostering an environment in 

which Audit Committee members may ask questions and express their viewpoints; 

D.  Reporting to the Board with respect to the significant activities of the Audit Committee and any 

recommendations of the Audit Committee; 

E.  Leading  the  Audit  Committee  in  annually  reviewing  and  assessing  the  adequacy  of  its  terms  of 

reference and evaluating its effectiveness in fulfilling its terms of reference; and 

F.  Taking such other steps as are reasonably required to ensure that the Audit Committee carries out its 

core responsibilities under its terms of reference. 

5.  AUTHORITY 

A.  The Audit Committee shall have access to such officers and employees and to such information 
respecting Capstone, as it considers to be necessary or advisable in order to perform its duties and 
responsibilities. 

B.  The external auditors shall have a direct line of communication to the Audit Committee through its 
Chair and may bypass management if deemed necessary. The Audit Committee, through its Chair, 
may contact directly any Capstone employee as it deems necessary, and any employee may bring 
before the Audit Committee any matter involving questionable, illegal or improper financial practices 
or transactions. 

C.  The Audit Committee shall have authority to engage independent counsel, consultants and other 
advisors at the expense of Capstone, as it determines to be necessary or advisable to carry out its 
duties and responsibilities, including setting and authorizing the payment of the compensation for 
any advisors employed by the Audit Committee, and to communicate directly with the internal and 
external auditors. 

6.  ACCOUNTABILITY 

A.  The  Audit  Committee  Chair  has  the  responsibility  to  make  periodic  reports  to  the  Board,  as 
requested, on financial reporting and internal financial control matters relative to Capstone. 

 
 
 
B.  The Audit Committee shall report its discussions to the Board by maintaining minutes of its meetings 

and providing an oral report at the next Board meeting. 

7.  MEETINGS 

Meetings of the Audit Committee shall be conducted as follows: 

A.  The Audit Committee shall meet at least four times annually at such times and at such locations as 
may be requested by the Chair of the Audit Committee. The external auditors or any member of the 
Audit Committee may request a meeting of the Audit Committee; 

B.  Notice of the time and place of every meeting of the Audit Committee shall be given in writing to 

each member of the Audit Committee a reasonable time before the meeting; 

C.  The external auditors shall receive notice of and have the right to attend all meetings of the Audit 

Committee; 

D.  Agendas  for  meetings  of  the  Audit  Committee  shall  be  developed  by  the  Chair  of  the  Audit 
Committee in consultation with management and the Corporate Secretary, and should be circulated 
to Audit Committee members one week prior to Audit Committee meetings; 

E.  The following management representatives shall be invited to attend all meetings, except executive 

sessions and private sessions with the external auditors: 

i.  Chief Executive Officer; 

ii.  Chief Operating Officer; and 

iii.  Chief Financial Officer; 

F.  Other management representatives shall be invited to attend as necessary; 

G.  A  member  of  the  Audit  Committee  may  be  designated  as  the  liaison  member  to  report  on  the 

deliberations of the Audit Committee to the Board; and 

H.  All  meetings  shall  include  an  in-camera  session  of  independent  directors  without  management 

present.