Quarterlytics / Utilities / Diversified Utilities / Federal Grid Company Of Unified Energy

Federal Grid Company Of Unified Energy

fees · LSE Utilities
Claim this profile
Ticker fees
Exchange LSE
Sector Utilities
Industry Diversified Utilities
Employees 10,000+
← All annual reports
FY2014 Annual Report · Federal Grid Company Of Unified Energy
Sign in to download
Loading PDF…
Formula for 
Reliability 

Cooperation

Governance

+

Technology

+

Infrastructure

+

Strategy

Federal Grid 
Company

of Unified
Energy System

Annual Report 

2014

Federal  Grid  Company’s  formula  for  reliability  is  based 
on  four  key  components:  infrastructure,  technology, 
governance,  and  cooperation.  Once  effectively  applied 
and  continuously  developed,  those  components  help  us 
successfully  implement  our  strategic  business  priority  – 
ensuring reliable and uninterrupted supply of electricity to 
customers across Russia.

The Annual Report was preliminary approved by the Board 
of Directors of Federal Grid Company,  
Minutes No. 267 dated 25.05.2015. 

Chairman 
of the Management Board 

A.Murov

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсонал  
Federal Grid 
Company today

•  Federal Grid Company is 
a unique infrastructure 
company that provides 
reliable and uninterrupted 
electricity transmission 
through backbone electric 
grids in the Russian 
Federation 

•  The Federal Grid Company’s 
key activity is managing the 
Unified National Electric 
Grid (UNEG) that includes 
a network of transmission 
lines covering most of 
Russia1 

•  Federal Grid Company is a 

world leader among public 
electric grid companies 
in terms of the length of 
electricity transmission 
lines and transformer 
capacity 

•  Federal Grid Company 

is a customer-oriented 
company that ensures high 
standards of customer 
services and stakeholder 
engagement in order to 
maintain sustainability of 
the long-term development 

•  The Company ensures 

reliable, uninterrupted and 
safe supply of electricity 
to customers through 
continuous investments 
in modernising and 
expanding the electric 

power infrastructure 
using advanced innovative 
technologies, and by 
improving anti-terrorism 
and anti-crime measures, 
as well as enhancing 
economic and information 
security of the Company 

•  Federal Grid Company 
is a natural monopoly 
in the area of electricity 
transmission and is included 
in a list of systemically 
important organisations of 
strategic importance to 
Russia 

•  Federal Grid is a public 
company; its securities 
are traded on Russian and 
foreign stock markets, 
including the Moscow Stock 
Exchange and the London 
Stock Exchange 

•  The Company’s major 

shareholder that owns 
80.13% of its common stock 
is the state-owned company 
Russian Grids (Rosseti) 

•  Federal Grid Company 

was established in 2002, 
in accordance with the 
Russia’s electric energy 
industry reform, as the 
organisation that manages 
UNEG for the purpose 
of its maintenance and 
development 

KEY ACTIVITIES 

Managing the 
Unified National 
Electric Grid (UNEG) 

Providing the electricity 
transmission and 
technological connection 
services to WECM participants 

Investing activities 
in the area of UNEG 
development 

Maintaining the UNEG 
facilities and providing 
technical supervision 

1  Certain UNEG areas are managed by other operators: JSC Grid Company of the Republic of 
Tatarstan, JSC Bashkir Grid Company, JSC Irkutsk Electric Grid Company and JSC Regional 
Electric Grids (REG). 

138.8

thousand km
of total length of electricity 
transmission lines 

332.1 

thousand MVA
of transformer capacity 

77

Russian regions
with a total area of more than

>15.1

mln sq. km
covered by the Federal Grid’s 
transmission lines and substations 

>50%

of all energy consumption in Russia is of 
electricity transmitted via the Company’s 
grids 

branches

51
>24

thousand 
employees

135.2

RUB billion
amount of capital investments 
deployed in 2014 

169

RUB billion
revenue at year end 2014 

56.1

RUB billion

market capitalisation as of 
the end of 2014 

Contents

Statement from the Chairman  
of the Board of Directors

Statement from the Chairman 
of the Management Board

4

6

Highlights

Key Performance Indicators  8

2014 Events  10

Social responsibiity 
and sustainable 
development 

67 Sustainable 

Development Principles

69 HR Policy

75 Social Policy

77 Health and Safety

79 Environment

Strategic overview 

Market overview  13

Business Model 14

Development Strategy 16

Geography  20

Corporate governance

Governance System 

83 Corporate Governance 

Principles

86 Board of Directors

98 Management Board

Performance results

Operating Performance

Control System

Electricity Transmission  23

Technological Connection  25

Improving Reliability  27

Development  
of Communication  
Networks and IT systems 

31

Procurement 33

Energy Saving and Energy 
Efficiency 

38

Investments and Innovative 
Development 

Investing Activities  41

Innovative Development
Programme 

49

Management’s Discussion 
and Analysis

Financial Performance 54

Cash Flow 58

Financial Position  59

Tariff Regulation 62

Debt Portfolio  64

Credit Ratings 65

106 Internal Control and Risk 
Management System

115 Anti-Corruption activities 

Share Capital

117 Share Capital Structure 

118 Stock Market 

121 Dividend Policy 

122 Information Policy 

124 Investor Relations 

Additional 
information

125 Disclaimer 

125 Contacts 

127 Glossary 

Appendices 

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналSTATEMENT FROM THE CHAIRMAN OF THE BOARD OF DIRECTORS 

Efficient work for the benefit   
of the countr y and shareholders

the entire Ural region. We completed con-
struction of power distribution scheme 
from power unit No. 3 with a capacity of 
1,000 MW of the Rostovskaya NPP. Its 
commissioning will make it possible to 
cover future demand for electricity and 
capacity in the integrated power system 
of South and improve the reliability of 
power supply to customers. We provided 
for the development of the oil and gas 
complex in the Far North by commission-
ing two 220 kV substations of new gener-
ation in Yamal-Nenets Autonomous Okrug 
(“Arsenal” and “Mangazeya”). Two new 
electricity transmission lines from 500 kV 
Tarko-Sale substations and Urengoi HPP 
will be instrumental for implementation 
of important infrastructure projects in the 
region. 

I should particularly emphasise the 
commissioning of an ultra-high voltage 
500 kV Yenisei substation for the supply 
of electricity to Krasnoyarsk. The new 
facility will be the second largest source 
of energy supply in the capital city of Sibe-
ria. It will eliminate the energy shortage 
in the central power district of Krasno-
yarsk Krai.

The launching of external power supply to 
Vostochny Spaceport was a milestone. We 
currently can deliver capacity up to 121 
MW to the power receivers of the com-
plex. We intend to connect the spaceport 
facilities to the Company’s second substa-
tion, 500 kV Amurskaya.

Federal Grid Company’s achievements in 
2014 were largely merited to the con-

Dear shareholders!

In 2014, the Board of Directors focused 
on the establishment of necessary 
conditions for meeting the Company’s 
strategic goals, i.e. to ensure reliable and 
high-quality energy supply to the custom-
ers in the Russian Federation and lay the 
groundwork for the further strengthening 
of the electric power grid infrastructure. 

“Federal Grid Company’s achievements 
in 2014 were largely merited to the 
concerted and fruitful joint efforts of the 
Board of Directors and the Company’s 
management team.”

Federal Grid Company improved the 
reliability of the Unified National Electric 
Grid’s operations in 2014. We managed 
to reduce the accident rate by 14.5%, and 
our actual electricity losses were below 
the targets that had been approved by the 
Russian Ministry of Energy. 

Federal Grid Company delivered power 
that was essential for the implementation 
of major industrial and infrastructure 
projects in Russia. By commissioning of 
330 kV Vasileostrovskaya substation we 

completed the construction of the energy 
ring in St Petersburg that substantially 
improved the reliability of electricity 
supply and made it possible to connect 
the city’s new facilities, including those 
that are being built for the 2018 FIFA 
World Cup, to the energy system. We have 
built infrastructure for power delivery at 
the new power unit of Beloyarskaya NPP. 
Additional capacity of 800 MW will make 
it possible to mitigate power shortage in 
Sverdlovsk and Chelyabinsk oblasts and 
improve the reliability of power supply in 

certed and fruitful joint efforts of the 
Board of Directors and the manage-
ment team aimed at overcoming the 
impact of uncertainty in the capital 
market and economic slowdown on the 
Company’s operations and the sector 
in general.

It is important to note prompt coop-
eration between the Board of Direc-
tors and the executive team on the 
key issues of operating and investing 
activities.

“The Company’s main goal in 2015 will be to 
identify and use the capacity for saving and 
import substitution, while the unconditional 
priority will be to ensure the reliability of 
UNEG and reduce the accident rate.”

the reliability of UNEG and reduce the ac-
cident rate. The implementation of social 
projects that focus on the retention and 
development of the Company’s profes-
sional team remains our priority. 

As for corporate governance, Federal 
Grid Company employs the best prac-
tices and implements a package of 
measures outlined in the new Corporate 
Governance Code. These include, but 
are not limited to, provisions that are 
aimed at making the Company highly 
attractive for investors and, consequent-
ly, at improving its competitiveness in 
the capital markets. Furthermore, the 
Company’s corporate governance prac-
tices are being changed in order to make 
them consistent with the requirements 
of MICEX Listing Rules to the issuers, 

In 2014, the Government of the Russian 
Federation approved the Long-Term 
Development Programme of Federal 
Grid Company until 2019 and Prospects 
through 2030 that had been adopted 
by the Company’s Board of Directors. 
The Programme does not envision any 
increase of electricity demand in the 
coming five years, while operational costs 
should be reduced by 25% by 2017.

Much attention is being paid to import 
substitution. Federal Grid Company 
intends to reduce import of equipment to 
a minimal level by 2030. We expect that 
equipment will be manufactured domesti-
cally but also supplied by member states 
of the Customs Union. The aim of import 
substitution is to maintain the energy 
sector’s sustainability to external and 
internal economic, human-induced and 
natural hazards, and minimise damages 
caused by destabilising factors including 
geopolitical ones.

Thus, the Company’s main goal in 2015 
will be to identify and use the capacity for 
saving and import substitution, while the 
unconditional priority will be to ensure 

whose shares are traded on the Level 1 
quotation list. 

In 2015, the Company will continue work 
on making its internal documents, rules 
and procedures consistent with the new 
requirements of the Russian legislation 
and recommendations of regulators. This 
will help to improve the efficiency and 
competitiveness and strengthen the confi-
dence of customers and investors.

A detailed overview of Federal Grid 
Company’s achievements in sustainable 
development is available in the Social Re-
sponsibility and Corporate Sustainability 
Report, which is published annually.

Federal Grid Company faces all important 
tasks in 2015. We will have to commission 
new and reconstructed grid facilities in 
accordance with agreed-upon schedules 
and improve the efficiency of our core 
business processes, including those that 
are part of our operations as a member of 
Russian Grids Group of companies.

I am confident that Federal Grid Company 
will complete these tasks successfully 
and continue its efficient work for the 
benefit of the country and shareholders. 

“As for corporate governance, Federal Grid 
Company employs the best practices and 
implements a package of measures outlined 
in the new Corporate Governance Code.”

Oleg 
Budargin

4

5

STATEMENT FROM THE CHAIRMAN OF THE MANAGEMENT BOARD
Reliability and Financial Sustainability

Dear shareholders!

For the first time over the past years 
Federal Grid Company posted profit in 
2014 despite freezes on tariff growth and 
the rising inflation. This result was made 
possible only due to strenuous cost-cut-
ting efforts. We will follow our course 
toward internal optimisation and positive 
financial results in 2015, too. In my view, 
the priority objective for 2015 is to main-
tain high reliability of energy supply and 
improve accessibility of our infrastructure 
and the customer focus. The only way for 
the Company to develop in the current 
macroeconomic realities is the utmost 
internal efficiency and higher quality of 
services that we provide.

Operational and Financial 
Results 

In our operations, we have achieved the 
most important objective, i.e. reliable 
electricity supply to our customers. 
The Company met all its targets. There 
were no major accidents. The volume of 
process disruptions at the facilities of the 
Unified National Electric Grid went down 
in the reporting period by 14.5% year-
on-year. By 2015, Federal Grid Company 
achieved the highest indicators of UNEG 
reliability over the last five years: the ac-
cident rate declined by 40% since 2010.

The repair work in physical terms that had 
been planned for 2014 is fully completed. 
The total investments in repairs amount-
ed to RUB11.7 billion. At the same time 
we optimised procurement, thus ensuring 
cost cutting.

In terms of the grid development, in 2014 
we ensured power delivery at 10 gen-
eration facilities with the total capacity 
of 4,700 MV, including 880 MV at the 
fourth power unit of Beloyarskaya NPP 
and 1,100 MV at the new third plant of 
Rostovskaya NPP. The Company built 
an electrical grid infrastructure for 
8 thermal heat generation facilities 
across Russia.

The Company completed the construc-
tion of an energy ring around St. Peters-
burg, ensured external energy supply to 
Vostochny Spaceport, built a large feeding 
centre in Krasnoyarsk krai (500 kV “Yeni-
sei” substation) and implemented several 
projects for oil companies (e.g., the devel-
opment of Vankor group of fields; electric 
power supply to the second phase of the 
East Siberia–Pacific Ocean oil pipeline).

In 2014, Federal Grid Company reported 
revenue growth to RUB168.9 billion, or by 

“By 2015, Federal Grid Company achieved 
the highest indicators of UNEG reliability 
over the last five years: the accident rate 
declined by 40% since 2010.” 

8.7% as compared with 2013. It is impor-
tant to note that we managed to increase 
revenues from technological connection 
by sixfold (by more than RUB6 billion). 

In 2014, we set on major cost optimisation 
events. The result of these efforts was a 
reduction of operating costs (unit cost and 
administrative costs, excluding depreci-
ation and property tax payments) relative 
to the 2013 level although the number of 

equipment items serviced by the Compa-
ny has increased. 

Federal Grid Company received net profit 
of more than RUB5.1 billion for 2014 – for 
the first time over the past years. The ad-
justed earnings before interest, profit tax, 
depreciation and amortisation (adjusted 
EBITDA) amounted to RUB99.6 billion in 
the reporting year, up by 3% as compared 
with 2013.

Priorities in the Period of 
Increasing Uncertainty 

The approval of a Long-Term Develop-
ment Programme of Federal Grid Compa-
ny for 2015-2019 by the Government of the 
Russian Federation was one of the most 
important outcomes in 2014. The pro-
gramme is based on a strictly pragmatic 
approach. The Company cannot afford, 
and does not see the need, to continue 
expansive accelerated development of its 
backbone electric grid complex. In the 
coming five years our paradigm will be to 
increase internal efficiency of operations 
and investments.

This implies our continued efforts to meet 
the objectives related to providing relia-
ble and accident-free work and address 
new issues, such as maintenance of the 
revenue base, increase of the capacity 
load rate, introduction of new schemes 
for the financing of technological con-
nection, and support of economic growth 
areas. The continued optimisation of 
operating costs and construction costs 
by end-2017 by 25% and 30%, respective-
ly, becomes a more important task for 
maintaining the Company’s sustainable 
financial health.

As for implementation of the techno-
logical connection projects, we focus 
on providing the connection within the 
deadlines required by the customer. Given 
financial constraints, we design various 
options for obtaining project financing (via 
government support and contributions 
from customers).

The Company will continue to formulate 
its key investment priorities in line with 
the government objectives. Federal Grid 
Company will continue work on such 
projects as strengthening of electricity 
connections between integrated power 
systems of Centre and North-West, the 
construction of an electricity grid infra-
structure for the extension of BAM and 
Transsib, and energy supply to ESPO-2.

Federal Grid Company is focused on the 
most open and transparent planning of its 
investments, including flexible adapta-

In 2014, The Company received net 
profit of more than RUB 5 billion for 
the first time over the past years.” 

tion of its investment programme to the 
changing actual demand for electricity on 
the part of our large customers.

In terms of geography, Eastern Siberia 
and the Russian Far East as regions of 
accelerated development and economic 
growth remain particularly important for 
the Company.

Import substitution is still our key prior-
ity. We look at the Programme of Import 
Substitution until 2019 (adopted in 2014) 
from the perspective of cost cutting and 
mitigation of foreign exchange risks.

Federal Grid Company has a technical 
policy, adopted a Regulation on the energy 
management system. In 2014 we received 
a certificate of compliance with the inter-
national standard ISO 50001:2011.

In our view, it is important to emphasise 
that by improving energy efficiency of 
Federal Grid Company we help to reduce 
energy intensity of the national GDP. 
Energy efficiency and import substitution, 
as well as our efforts to ensure reliable 
energy supply, are described in further 
detail in our 2014 Social Responsibility 
and Corporate Sustainability Report. 

“By improving energy efficiency 
of Federal Grid Company, we help 
to reduce energy intensity of the 
national GDP”

In the social policy the Company retains 
its focus on support and development 
of human capital, collaboration with the 
relevant institutions of higher education, 
creating opportunities for young special-
ists, support of veterans, and on ensuring 
generational continuity for the transfer of 
valuable professional experience.

In 2014, we completed the first five-
year targeted Energy Saving and Energy 
Efficiency Programme. The programme 
targets for technological and econom-
ic effect are met by 105% and 108%, 
respectively. A similar programme for 
the next five years has been drawn up 
and approved by the Management Board. 

I would like to emphasise that the key to 
reliable and sustainable work of Federal 
Grid Company is improvement of our own 
efficiency. We should continuously refine 
business processes related to the ensur-
ing of reliability, cut construction costs 
and build only those facilities that are in 
demand, cut maintenance expenditure, 
provide efficient technological connection 
services, and be transparent for custom-
ers, shareholders and regulators. We have 
set goals and drew up detailed action plans 
for their implementation. I firmly believe 
that the consistent work of our team will 
help us to meet all our targets and make 
Federal Grid Company even stronger, more 
reliable and more successful. 

Andrey 
Murov

6

7

KE Y PERFORMANCE INDICATORS

Revenues, RUB mln

Adjusted EBITDA, RUB mln

168,941

155,352

138,137

138,837

96,296

99,603

84,683

82,809

111,085

+8.5%

68,301

+3.4%

Length of electricity transmission lines*, 
thousand km

Number of substations*, units

138,8

135.1

131.6

919

924

891

854

124.6

121.7

+2.7%

805

+0.5%

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

* PTLs the ownership rights to which have been duly registered for Federal Grid 
Company and other owners, excluding leased PTLs and SSs with 10 kW voltage and 
lower operating on the territory of Krasnodar Krai and the Far East Federal University 
on Russky Island owners 

* SSs the ownership rights to which have been duly registered for Federal 
Grid Company and other owners, excluding leased PTLs and SSs with 10 kW 
voltage and lower operating on the territory of Krasnodar Krai and the Far East 
Federal University on Russky Island owners 

Net profit (loss), RUB mln

Total Shareholder Return (TSR), %

Electricity supply*, mln

Electricity losses within UNEG,  
mln kWh

57,082

5,137

+119.8%

2010 

2011 

2012 

2013 

2014

-2,468

-24,532

-25,898

10.8

2010 

2011 

2012 

2013 

2014

503,948

486,364

522,711

518,093

514,057

22,526

22,553

22,262

21,946

-0.9%

21,261

-4.5%

-23.4

-32.2

+10.5%

-50.5

-56.4

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

* electricity supply to distribution grid companies, direct customers and 
independent energy joint stock companies, overseas power systems, net 

Financial leverage

Actual implementation of the investment 
programme, RUB bn

Workplace accident frequency rate 
per 1,000 persons

Environmental costs, RUB mln

0.44

0.44

0.32

0.22

0.14

 0%

167.0

184.7

179.9

149.7

0.762

90.9

-39.3%

0.253

0.285

0.319

-61.1%

0.124

225.8

206.7

186.1

155

142.5

+9.2%

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

HIGHLIGHTS 

KE Y E VENTS IN THE 
REPORTING YE AR 

2014

Development 
Strategy

Delivery of the 
Investment 
Programme 

Sustainable 
Development 

Corporate 
Governance 

Standard & 
Poor’s Rat-
ings Services 
lowered the 
long-term 
foreign cur-
rency credit 
rating of 
Federal Grid 
Company 
from BBB/
Negative 
to BBB-/
Negative 
following the 
downgrade of 
the Russian 
Federation 
sovereign 
credit rating 
from BBB to 
BBB- 

The Company 
completed 
the construc-
tion of the 
500 kV Bo-
guchanskaya 
HPP – Ozer-
naya HVL 330 
km in length 
between 
Krasnoyarsk 
Krai and Ir-
kutsk Oblast 

The National 
Corporate 
Governance 
Rating of 
Federal Grid 
Company was 
confirmed 
at 7+ level/
Well-De-
veloped 
Corporate 
Governance 
Practice 

International 
rating agency 
Fitch Ratings 
affirmed the 
Company’s 
credit rating 
at BBB level 

Shares of 
Federal Grid 
Compa-
ny were 
transferred 
to Level 1 
quotation list 
of Moscow 
Exchange 

The Annual 
General 
Meeting of 
Sharehold-
ers made a 
resolution to 
pay dividends 
for the first 
quarter of 
2014 in the 
amount of 
RUB436.8 
mln

The second 
meeting of 
the Consum-
er Council 
was held in 
Moscow with 
participation 
of repre-
sentatives 
from public 
and scientific 
organisa-
tions, small 
and medium 
businesses, 
power supply 
companies 
and our ma-
jor consum-
ers. 

An Energy 
Saving and 
Energy Effi-
ciency Pro-
gramme for 
2015 – 2019 
was approved 
which aims to 
achieve the 
operational 
and economic 
benefits 
expressed 
in 32.4 thou-
sand tonnes 
of reference 
fuel 

The Company 
Headquar-
ters and two 
branches – 
MES Volga 
and Samar-
skoye PMES – 
received a 
certificate of 
conformity 
to the ISO 
50001:2011 
Energy 
Management 
System

Moody’s 
affirmed the 
Baa3 interna-
tional scale 
and Aaa.
ru national 
scale ratings 
of Federal 
Grid Com-
pany 

E VENTS AFTER THE 
REPORTING DATE

2015

The Envi-
ronmental 
Management 
Systems of 
the Corporate 
Headquar-
ters and the 
branches 
MES South, 
MES North-
West, MES 
Centre and 
MES East 
were certified 
for the com-
pliance with 
the require-
ments of the 
international 
standard ISO 
14001:2004 

Federal Grid 
Company 
connected 
5.9MW ca-
pacity to new 
facilities of 
the Skolkovo 
Innovation 
Centre – 
Hypercube, 
Matrex, 
Technopark 
buildings 
and the first 
electric vehi-
cle charging 
stations 

Programme 
for Import 
Substitution 
of Equipment, 
Technologies, 
Materials and 
Systems for 
2015-2019 
was approved 
aimed at 
increasing the 
share of do-
mestic man-
ufacturers in 
equipment 
procurements 
from 30 to 
90% 

The Russian 
Ministry 
of Energy 
approved the 
investment 
programmes 
of Federal 
Grid Company 
for 2014 and 
for 2015-2019

The Board of 
Directors ap-
proved a new 
version of the 
Environmen-
tal Policy that 
enhances the 
environmen-
tal respon-
sibility of 
Federal Grid 
Company and 
determines 
key areas of 
environmen-
tal activity 

Power 
facilities 
were com-
missioned 
to supply 
electricity to 
oil pumping 
stations 11, 
15 and 19 of 
the Eastern 
Siberia–Pa-
cific Ocean 
(ESPO) 
pipeline, 
providing a 
throughput 
capacity of 50 
mln tonnes 
per year 

Federal Grid 
completed 
testing of 330 
kV Gatchin-
skaya-Len-
ingrad NPP 
electricity 
transmission 
line that is 
one of the 
elements of 
power deliv-
ery scheme 
of the 
Leningrad 
NPP-2 under 
construction 

Following 
the review of 
the Russian 
Federation 
sovereign 
rating, Fitch 
lowered the 
long-term 
foreign cur-
rency default 
rating of 
Federal Grid 
Company 
to the level 
of Russia’s 
rating equal 
to ‘BBB-’, the 
Outlook is 
Negative

Following 
the review of 
the Russian 
Federation 
sovereign 
rating, 
Moody’s 
lowered 
the Federal 
Grid’s credit 
ratings to 
Ba1global 
scale and 
Aa1.ru na-
tional scale 
ratings and 
placed them 
on review for 
downgrade

A 500 kV Iset’ 
substation 
was com-
missioned in 
Sverdlovsk 
Oblast to 
deliver power 
from a new 
power unit 
of Beloyarsk 
NPP 

Technical 
re-equip-
ment of 220 
kV Chara 
substation in 
Zabaykalsky 
Krai was 
competed 
that improved 
the reliability 
of electricity 
supply to 
the region, 
including the 
Baykal-Amur 
Mainline 
Railway and 
Udocan cop-
per field 

The Board 
of Directors 
approved the 
Long-Term 
Development 
Programme 
of Federal 
Grid Compa-
ny for 2015-
2019 and 
Prospects 
through 2013, 
that had been 
previously 
approved by 
the Gov-
ernment of 
the Russian 
Federation 

A ‘Road 
Map’ was 
developed for 
integrating 
key provi-
sion of the 
new Russian 
Corporate 
Governance 
Code into the 
Company’s 
practice 

Following its 
downgrade of 
the Russian 
Federation 
sovereign 
credit rating, 
Standard 
& Poor’s 
lowered the 
credit rating 
of Federal 
Grid Com-
pany to BB+/
Negative 

Upon com-
pletion of the 
review peri-
od, Moody’s 
affirmed the 
Federal Grid 
Company’s 
Ba1 global 
scale rating/
Negative, 
and Aa1.
ru national 
scale rating

The Board 
of Directors 
approved the 
‘Road Map’ 
for integrat-
ing key pro-
vision of the 
new Russian 
Corporate 
Governance 
Code into the 
Company’s 
practice

Federal Grid 
Company 
joined the 
Anti-Cor-
ruption 
Charter of 
the Russian 
Business

The Supervi-
sory Board of 
Vnesheconom-
bank made 
a decision to 
invest RUB40 
billion of pen-
sion savings 
for a 30 years 
period through 
acquisition of 
Federal Grid’s 
bonds for the 
Company’s 
investing 
activities

January

February

March 

April

May

June

July

August

September

October

November

December

January

February

March 

April

ОАО «ФСК ЕЭС» Годовой отчет 2014

Strategic overview

Implementation of the Long-Term Development 
Programme of Federal Grid Company is aimed at 
maintaining and developing the Unified National Electric 
Grid - a backbone electric grid infrastructure for 
ensuring economic growth in Russia and uninterrupted 
energy supply for consumers throughout the country 

T E G Y   + S

U

A

R

T

S

+

N
O

I

T

A

E

R

C

S

T

A

I

N

A

B

I

L
I
T
Y

+
 S

E

U

VAL

C

A

LE+

Infrastructure

Reliability

=

Technology

+

Governance

+

+

Cooperation

Strategy

MARKET OVERVIE W 

Preparedness for   
Market Challenges 

According to the Russian legislation, 
Federal Grid Company is the manage-
ment organisation of the Unified Na-
tional (All-Russia) Electric Grid (UNEG). 
The backbone grid is a part of the basic 
infrastructure of the Russian electricity 
market, and electricity transmission 

business is a natural monopoly. Being a 
natural monopoly entity, the Company is 
subject to the government regulation. 

The infrastructural nature of the elec-
tricity industry in general and of the 
electric grid in particular, explains the 
high dependence of the scope and content 

Key Parameters of Economic Development  
in Russia

15.8

GDP growth, %

Consumer price growth, %

8.4

6.9

6.8

7.8

4.5

4.3

5.1

3.4

1.3

0.6

2010 

2011 

2012 

2013 

2014 

–3.0

2015
forecast

7.3

Industrial production growth rate, %

2.2

13

5.0

0.2

Industrial production growth rate for 
«Production and distribution of electricity, 
gas and water»as a type of economic 
activity, %

1.7

0.4

3.4

1.3

–0.4

–0.1

–1.6

–2.5

2010 

2011 

2012 

2013 

2014 

2015
forecast

Source: Rosstat; Ministry of Economic Development, Social and Economic Outlook on 
the Russian Federation for 2015 

13

of Federal Grid’s services on the over-
all economic situation. The social and 
economic conditions in the reporting 
year constrained the capacity of the grid 
services market. Electricity consumption 
across the unified energy system (UES) of 
Russia increased by 0.4% against the 2013 
level and reached 1,013,900 billion kWh in 
2014. A moderate increase of electricity 
consumption is expected in 2015-2018. 
A substantial increase in electricity 
consumption across UES in these years 
will be because of its expansion within the 
integrated power system (IPS) South and 
IPS East (integration of the western and 
central energy regions of the Republic of 
Sakha (Yakutia)). A modest increase of 
demand for electricity is expected in the 
period beyond 2018.

Given the crisis and economic slowdown, 
the Company faces a certain reduction 
in its operating and investing activities, 
and stronger financial constraints, such 
as reduction in income and increase in 
funding costs.

The volume of electricity transmission 
services reduced in 2014 in line with the 
tendency observed since 2009. Given the 
trends and the abovementioned factors, 
and with regard to the transition to the 
principle of measuring services at their 
average arithmetic capacity, Federal 
Grid anticipates a certain reduction of 
the market for its services despite the 
increased number of consumers. The 
number of customers will increase large-
ly because direct consumers will grow in 
number (including the “last mile” ones 
and energy-selling organisations acting in 
the interests of the customers). However, 
distribution grid companies will remain 
the largest customers of the Federal 
Grid’s services.

Taking into account the intensity of filing 
applications and contractual time-
frames, there has been no any strongly 
pronounced tendency in the volume of 
technological connection services in 
recent years.

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсонал 
 
 
 
STRATEGIC OVERVIEW

BUSINESS MODEL 

Long-Term Value Creation

Federal Grid Company’s business model is aimed at ensuring the sustainable development of the Company  
in the long term and the creation of values for all stakeholders through consistent implementation of our mission

R E S O U R C E S

S T R A T E G I C   G O A L S   A N D   O B J E C T I V E S

V A L U E   C R E A T I O N

SHAREHOLDERS AND 
INVESTORS

GOVERNMENT 
AUTHORITIES
Russian Government, 
Ministry of Energy, 
FTS

MISSION OF JSC FGC UES

To ensure energy security of consumers in 
Russia through maintaining and developing 
the electricity transmission infrastructure

•  Growth of share value and 

dividends for shareholders and 
investors

•  Interest income for debt providers
•  Payment of national taxes 

Financial 
assets

•  Equity

•  Debt

Production 
assets

•  UNEG facilities: 

1. Transmission lines 

2. Substations

Intellectual
assets

•  Patents

•  Licenses

•  Software

•  Increase return on equity

•  Reduce operational and investment costs

•  Maintain financial sustainability

•  Develop UNEG infrastructure in order to prevent 

constraints on economic growth

•  Ensure reliability and quality 
of energy supply to customers

•  Consolidate all facilities of UNEG electric grids 

•  Maintain a competitive level of tariffs on 
electricity for industrial development

•  Ensure quality customer service

WHOLESALE 
ELECTRICITY AND 
CAPACITY MARKET

Supply of 
electric power 
and capacity

GENERATION 
FACILITIES

Services

E N T

M

E

Tariffs

G

A

N

A

GIC  M

E
T
A
R
T
S

Purchase 
of electricity 
and capacity for 
compensation  
of losses

    C

O

R

P

O

Services

R

A

T

E

G

O

V

E

Payment 
for services

R

N

A

N

C

E

INVESTMENTS

ELECTRICITY
TRANSMISSION

MAJOR 
CONSUMERS OF 
ELECTRIC ENERGY
grid companies, 
factories, Russian 
Railways 
and others

•  Develop research and innovation capacity 

•  Develop and put in place new technologies

•  Substitute imports in order to support 

innovative development of the Russian energy 
sector

SUPPLIERS AND 
CONTRACTORS

F

I

N

A

N

C

I

A

L

M

A

N

A

G

E

M

E

NT

  INNOVATIONS

T
N
E

M

E

G

A

N

A

K   M

R I S

RESEARCH 
INSTITUTIONS, 
CERTIFICATION 
AND EDUCATIONAL 
ORGANISATIONS

Payment 
for services

TECHNOLOGICAL
CONNECTION

Payment 
for services

Services

Human 
assets

•  Employees

•  Employees’ experience and 

professional expertise

•  Corporate culture

•  Develop and train personnel

•  Provide social support

•  Establish a talent pool 

for a «smart» energy sector

•  Cooperate with higher education institutions

Natural 
assets

•  Water 

•  Air

•  Energy resources

•  Ensure environmentalisation and improve 

energy efficiency of the electric grid 
operations

•  Reduce air emissions of hazardous 

substances

•  Reduce water consumption

C O R E PRO C E S SE S

Electricity 
transmission
In accordance 
with Russian 
laws, services 
of electricity 
transmission 
via UNEG are 
monopoly 
operations 
regulated 
by the State 

Technological 
connection
This is a service 
package to 
connect power 
receivers of 
consumers, 
as well as 
generating and 
transmission 
facilities to 
Federal Grid’s 
electric grids. 

Investments 
Implementation 
of projects to 
build new and 
to reconstruct 
the existing 
facilities of the 
electric grid 
infrastructure 
with a view to 
improve the 
reliability of 
UNEG 

HUMAN  
RESOURCES

Innovations
Development and 
implementation 
of innovative 
technologies 
in the process 
of modernising 
UNEG 
electric grid 
infrastructure

AU X ILLI A RY PRO C E S SE S

Technical 
maintenance 
and repairs

Energy saving 
and energy 
efficiency

Health 
and Safety

Procurement

HR policy

Social 
responsibility

Environment

•  New facilities: electricity 

transmission lines and substations

•  Reliable energy supply to 

consumers for development of the 
economy

•  Mutually beneficial co-operation 
with suppliers and contractors

•  Energy security of the State  

•  Development of new 

technologies for higher 
production efficiency

•  Energy saving and increased 
energy efficiency within the 
Company and across the country

•  Wages/salaries, social 

security and opportunities for 
professional development for 
employees

•  Job creation that drive economic 

growth in the country

•  Balance between the use of 
natural resources and the 
efficiency of economic activities 

THE STATE AND THE PUBLIC 
 
 
 
 
 
 
S T R A T E G I C   O V E R V I E W

Trends in the Mid-Term Development of the Russian 
Electricity Sector 

• The electricity industry’s pricing pressure on the economy will 
be transformed into intensified competition for tariff revenues 
among all participants in the process of electricity production, 
distribution and sale

• Unequal electricity consumption across Russia because of the major 
differences between various regions in terms of capacity and current 
development of industrial and economic growth

• Customers will press for more reliable and better-quality energy 

supply on the back of rising prices for electricity in general

• Competition will be tougher on the wholesale electricity market as 
a result of commissioning new sophisticated generating capacities 
under regulated contracts for capacity supply

Electricity Consumption in Russia in 2010-2014 and Forecast for 2015-2020 

2010

2011

2012

2013

2014

2015 
forecast

2016 
forecast

2017 
forecast

2018 
forecast

2019 
forecast

2020 
forecast

Electricity consumption in 
UES of Russia, billion kWh

961.7

1,000.7

1,016.5

1,009.8

1,013.9

1, 016.3

1,028.7

1,045.1

1,053.7

1,061.4

1,084.3

The continued development of the 
national energy sector is based on 
the scenario of innovative economic 
development. According to the Energy 
Strategy of Russia until 2030, as 
approved by the Russian Government, 
the national economy’s dependence 
on the energy sector is expected to 
weaken following priority being given 
to the development of innovative en-
ergy-saving sectors and the imple-
mentation of energy-saving technolo-
gies. As a result, the fuel and energy 
complex’s share of gross domestic 
product will fall by almost half by 2030 
(compared with 2005). 

At the same time, the energy sector will 
maintain its key role in making funda-
mental strategic decisions pertaining to 
the national development. This is par-
ticularly true of the construction of a new 
power infrastructure that will accelerate 
the social and economic development 
of Eastern Siberia and the Russian Far 
East, help to overcome infrastructural 
imbalances between regions and form 
new territorial and production clus-
ters based on energy-generating and 
-processing facilities. The geography 
of energy and service consumption 
will change in the medium term as 
new “growth points” will appear in the 

Russian economy. The highest relative 
increase of electricity transmission 
services is anticipated in the integrat-
ed power systems of East and South, 
including because of implementation of 
national investment projects.

The lessening dependence of the economy 
on the energy sector will be accompanied 
by qualitative changes in the role of the fuel 
and energy complex in the national economy. 
The Russian energy sector will maintain its 
influence on the social situation in the country 
because the Russian citizens’ living standards 
depend largely on the level of energy comfort 
and the availability of energy resources.

Strategic goal

KPI1

2014 
TARGET

2014 
ACTUAL

2015 
TARGET

Reliability of 
power supply to 
customers 

No increase in the 
number of major 
accidents 

Preventing increase in 
the number of persons 
injured in accidents

0

0

0

Zero 
increase

Zero 
increase

Zero 
increase

Achieving reliability 
level of services

1 *

1 *

1 *

Reduction 
in operating costs2

Reduction in 
investment costs2

Electricity losses 

Effective 
management

15% 

21.7%

17.03%

At least
 24% 

At least
 15%

4,13% 
of supply

No more 
than 4,27% 
of supply

At least
10%

No more 
than 4.34% 
of supply

DE VELOPMENT STR ATEGY
Long-Term Development Programme

From Outstripping Expansive Development   
to Higher Internal Efficiency

Labour productivity

-

-

At least
 17%

In December 2014, the Board of Direc-
tors approved1 a Long-Term Development 
Programme of Federal Grid Company for 
2015-2019 with a forecast through 2030 that 
had been approved by the Government of the 
Russian Federation.

The above Programme summarises the re-
sults achieved in the first long-term period 
of tariff regulation with respect to strategic 
objectives. It formulates the Company’s 
new goals, objectives and key performance 
indicators for the second long-term period 
of tariff regulation with due regard of the 
current and prospective economic situation 
in the Russian Federation. The Programme 

identifies the priorities of technical and 
investment policy, a forecast-based 
financial model, key risk factors and an 
action plan to achieve the strategic goals 
and objectives. 

findings of this audit must be commu-
nicated as proposed adjustments of the 
Programme to the Ministry of Energy no 
later than 10 July of the year following 
the reporting year.

The Board of Directors approved2 a 
standard for an annual independent audit 
of the Programme implementation. The 

The Long-Term Programme is consistent 
with the targets and provisions of the 
Development Strategy for the Russian 

Electric Grid Complex, as approved by 
Resolution No. 511-r of the Government 
of the Russian Federation, dated 3 April 
2013, and Methodological Guidelines on 
the Drafting of Long-Term Development 
Programmes approved by the RF Ministry 
of Economic Development in 2014 .

Federal Grid’s Development Programmes

• Long-term development programme for 2015-2019 and prospects  

through 2030

• Investment programme for 2015-2019

• Innovative development programme for 2013-2017 and through 2020 

• Fixed assets renovation programme 

• Maintenance and repair programme and targeted programmes 

• Energy saving and improved energy efficiency programme for 2015-2019 

• Programme for substitution of imported equipment, technologies,  

materials and systems

2010 – 2014 
First long-term period 
of tariff regulation 

2015 – 2019 
Second long-term period  
of tariff regulation

Implementing strategic objectives 
to overcome technological lags and 
ensure outstripping development 
of the electric energy infrastruc-
ture by implementing a large-scale 
investment programme

Transition from the model of out-
stripping expansive development 
of UNEG to a model of higher 
internal efficiency while main-
taining the reliability and techno-
logical development levels 

Development 
of UNEG 
infrastructure and 
implementation 
of projects 
of national 
significance

Meeting schedule 
for facilities 
commissioning

At least
 95%

100,9%

At least
 95%

* The actual value of the service reliability indicator is not higher than the plan value set by FTS

RESULTS 
of the first long-term period 
of tariff regulation, 
2010 – 2014

PLANS 
for the second long-term 
period of tariff regulation, 
2015 – 2019

•  Reliability and 

•  Reduce undersupply 

quality parameters 
improved, the number 
of accidents were 
reduced, and the fallout 
of the accident at the 
Sayano-Shushenskaya 
HPP was minimised 

•  Injury rate at the 

Company’s facilities 
lowered and the 
number of fires was 
reduced 

•  Electricity losses 

declined from 4.56% 
to 4.13%

•  An automated system 

of commercial 
metering of electric 
power was developed 
and put in place 

•  Innovative 

development, 
energy efficiency, 
energy saving and 
import substitution 
programmes are 
being implemented

of electricity to 
customers and 
optimise the 
utilisation of the 
existing capacities 

•  Reduce operational 
costs relative to the 
2012 level by 25% by 
2017 while maintaining 
reliability and quality 
of electricity supply to 
customers 

•  Implement a long-term 
investment programme 
in an environment 
where restrictions are 
imposed on the growth 
of tariffs, and reduce 
investment costs 
relative to 2012 by 30% 
by 2017 with minimal 
reduction of physical 
parameters 

•  Implement innovative 
development, energy 
efficiency, energy saving 
and import substitution 
programmes

•  A large-scale 

•  Implement new 

investment projects of 
national significance 
on schedule, such 
as energy supply 
to Baikal-Amur 
and Transsiberian 
railways; ensure 
reliable operation of 
UES of Russia working 
separately from the 
energy systems of the 
Baltic States; develop 
reliable power 
supply to customers 
in the Southern 
Federal District; 
provide electric grid 
infrastructure for 
schemes of delivery 
of capacity to the 
newly commissioned 
substation facilities

investment programme 
(RUB772.2 billion 
in 2010-2014) was 
completed
•  Since 2010, 

transformer capacity 
increased by almost 
7% to 332.1 MVA; the 
number of substations 
increased by 14% to 
924; and the length of 
electricity transmission 
lines increased by 
more than 14% to 
138.8 kilometers.

•  Investment projects of 
national significance 
(including projects 
of electric power 
infrastructure 
development in 
Vladivostok before 
APEC summit and in 
Sochi before the Winter 
Olympic Games) were 
implemented

1 Minutes No. 243 dated 19 December 2014

2 Minutes No. 245 dated 31 December 2014 

3 Methodological Guidelines on the Drafting of Long-Term Programmes for the Development of Strategic Open Joint-
Stock Companies and Federal Sate Unitary Enterprises and Open Joint-Stock Companies in Which the Total Share of the 
Russian Federation in the Authorised Capital Exceeds Fifty Percent

1 Methodology for Calculation and Evaluation of Key Performance Indicators for Federal Grid’s 
Senior Management is approved annually by the Board of Directors

2 Reduction of operating and investment costs relative to the  
2012 level

16

17

Strategic goal

KPI1

2014 
TARGET

2014 
ACTUAL

2015 
TARGET

Return on invested 
capital (ROIC)

Financial leverage 

At least 1

1.77

At least 0.9

Not higher 
than 1.5 **

0.44

Not higher 
than 1.5 **

Maintenance 
of financial 
stability 

Total shareholder 
return (TSR) 

At least the 
average 
value of 
MICEX PWR

- 50.5%

Higher than 
the average 
value for 
the past 
three years 
before the 
reporting 
year by the 
amount 
established 
by the Board 
of Directors 

RESULTS 
of the first long-term period 
of tariff regulation, 
2010 – 2014

PLANS 
for the second long-term 
period of tariff regulation, 
2015 – 2019

•  The Company has 
investment grade 
credit ratings (two 
of them equal 
to the sovereign 
rating) which made 
it possible for it to 
contract long-term 
(up to 35 years) 
debt at the average 
weighted rate of 8%

•  Contract long-term 
financing at lower 
rates, including 
from the National 
Wealth Fund, for 
implementation of 
investment projects of 
national significance

Our Company’s financial standing will 
largely depend on how effectively we will 
address these challenges. Measures 
included in the log-term development pro-
gramme are aimed at resolving thereof.

sian Electric Grid Complex. Yet, the Com-
pany aims to achieve these higher targets 
because it needs to complete a long-term 
investment programme and maintain a 
sustainable financial position.

The base case scenario underlying Federal 
Grid’s financial model is based on the 
meeting of key performance indicators 
including the cuts of operational costs by 
25% relative to the 2012 level and invest-
ment costs by 30% already by 2017. These 
targets are more ambitious than those set 
in the Development Strategy for the Rus-

The risks of deviation from the base case 
scenario of the long-term financial model 
are taken into account in a moderately con-
servative scenario that envisions reduced 
revenues from the electricity transmission 
service. This is because Resolution No. 
740 dated 31 July 2014 will become effec-
tive and the Company’s settlements with 

its direct customers will be based on the 
actual capacity as of 1 January 2015, while 
the existing procedure of payments by grid 
organisations will remain in place.  

The situation in the Russian economy 
developed in the second half of 2014 is 
making a significant impact on the param-
eters of Federal Grid’s strategic develop-
ment than had been set earlier. Therefore, 
the Long-Term Development Programme 
might be adjusted to reflect the forecasts 
of the social and economic development of 
Russia.

•  Contracts for 
technological 
connection to UNEG 
facilities were 
implemented (273 
applications). This 
helped to reduce the 
number of zones with 
free cross-flows from 
29 to 21 and intensify 
competition on the 
wholesale market

•  Ensure customer 

satisfaction with the 
quality of services 
including the level 
of tariffs, and 
schedule and price 
of technological 
connection of new 
customers  

•  Reduce the cost 
of technological 
connection of new 
customers 

Strategy in the Context of Sustainable Development

Traditionally, sustainable development is 
based on the ambition to meet the needs of 
the existing generation without threatening 
the needs of future generations. This can 
only be done if all stakeholders’ positions 
are taken into account, with continuous 
communication with these stakeholders 
and integration of these practices in all of 
the Company’s business processes.

Programme aimed, among other things, 
at the renovation, modernisation and 
innovative development of UNEG. The suc-
cess of this programme largely depends 
on constructive cooperation between the 
Company and a broad range of stakehold-
ers. These include suppliers, contractors, 
project and R&D think tanks, distribution 

electric grid companies, IDGCs, custom-
ers, generators, infrastructure regulators, 
labour unions, government authorities, 
public and environmental organisations 
and the expert community.

Effective 
engagement 
with customers 

Meeting deadlines 
for technological 
connection 

Not higher 
than 1

0.72

Not higher 
than 1.1

** Or not higher than the value set in the business plan  

Challenges

Trends in the development of the Russian 
economy and, in particular, the energy 
sector are placing new challenges for the 
Company. Successful overcoming of these 
challenges will depend on the consist-
ency in implementation of the corporate 
strategy. 

•  The actual growth rates of electricity 

consumption are below the targets due 
to macroeconomic deterioration. This 
poses new objectives for the Company 
with respect to rational planning of grid 
development and building an adequate 
economic model of payment for re-
serves. 

•  Electricity consumption by applicants for 
technological connection has not been 
increasing to a level that would provide 
for return on investment via the electric-
ity transmission tariff. As a result, the 
Company needs to make new mecha-
nisms for distributing responsibility, 
investment costs and risks of inaccurate 
planning of energy consumption among 
Federal Grid and applicants.

•  The tariff should at least cover the cost 
of debt and other mandatory costs, pro-
vide for financing of future investments, 
and ensure profits for shareholders. 
Therefore, Federal Grid Company needs 
to reduce its operational and investment 
costs substantially without lowering 
its reliability and increasing the future 
costs.

•  In late 2014, FTS approved the following 
regulatory parameters and tariffs for 
electricity transmission via UNEG for 
2015-2019: return on invested capital is 
set at 10%; tariff increase will be 7.5% in 
2015, 5.5% in 2016 and 4.5% annually in 
2017-2019. Tariff increase will be about a 
half of the anticipated inflation rate, and 
the operational costs efficiency index is 
set at 3% for 2015-2019. This means that 
the Company will need to make substan-
tial cuts of its operational costs in base 
prices of the first year of regulation. 

•  Given restrictions on the growth of 

tariffs, the Company should tighten its 
criteria for assessment and selection 
of investment projects and find new 

funding mechanisms. The need to imple-
ment new long-term projects that have 
national significance and are exposed 
to high commercial risks will require 
long-term financing at low rates, which 
is currently available from the state 
budget only. 

•  Depreciation of the national currency 

and growing inflation rates increase the 
uncertainty of investment expectations 
and might bring about delays in imple-
mentation of investment projects run by 
electricity consumers and in the gen-
eration sector. Not only new projects of 
technological connection will be delayed 
but new facilities will have a load lower 
than had been planned.

•  Restricted access of large banks to the 

global capital markets and the raising of 
the key rate by the CBR result in deterio-
rated terms of lending and higher cost of 
debt. Therefore, Federal Grid’s invest-
ment opportunities in implementation 
of new projects might diminish, thus 
having an adverse impact on its overall 
investment attractiveness. 

Owing to its specific role in the energy 
sector, economy and social development, 
Federal Grid Company expands and 
complements the traditional concept of 
sustainability in its operations.

As a monopoly operator of UNEG, The 
Company ensures electricity transmis-
sion via backbone electric grids and is 
responsible for providing a reliable power 
supply for consumers across the Russian 
Federation.

The Company’s responsibility for the effi-
cient administration and development of 
UNEG is not only to ensure a safe, reliable 
and uninterrupted electricity supply but 
also to provide non-discriminatory access 
to its grid services that should be provided 
in a transparent, honest (corruption-free) 
and innovations-based manner. This is 
why one of the Company’s most important 
tasks in terms of philosophy and values 
of corporate social responsibility and 
sustainable development is to continuous-
ly seek the balance between public and 
economic interests in our work.

Federal Grid Company, as one of the larg-
est electric power companies in Russia, is 
responsible for the condition of UNEG, the 
lynchpin of the national grid system and a 
vital public infrastructure. Having as-
sessed existing problems and prospective 
threats, the Company developed and began 
implementing a Long-Term Development 

Strategic Priorities  
of Federal Grid’s Sustainable Development

• To build mechanisms 
and practices for the 
synchronisation of 
stakeholder plans that 
envisage the development 
and expansion of UNEG

• To achieve import 

substitution for the 
purposes of the innovative 
development of the national 
energy 

• To form a talent pool for the 

smart energy sector 

• To develop responsible HR 
management practices 

• To improve labour protection 

and industrial safety 

• To strengthen environmental 
protection and improve the 
energy efficiency of grid 
operations 

• To ensure a fair distribution 

of economic value and assess 
the economic expediency of 
implementing innovations 
and new technologies 

• To integrate Corporate Social 
Responsibility (CSR) strategy 
in the internal business 
processes 

18
18

19
19

STRATEGIC OVERVIEW  GEOGR APHY   
Countr y-Wide 
Reliability 

Our Company operates in 77 
Russian regions covering an 
area of more than 15.1 million 
sq. km. The territory in which 
the Company’s facilities are 
located is divided into zones 
of responsibility for corporate 
branches - backbone electric 
grids (MES), and their 
local enterprises ( PMES). 
Underpopulated territories 
with no large customers – 
such as Chukotka, Kamchatka, 
Magadan Oblast, Sakhalin, 
Nenets Autonomous Okrug 
and Altai Republic – are not 
integrated into UNEG because 
they do not have economic 
conditions necessary for 
laying electricity transmission 
lines and establishing large 
substations.

1. MES Centre

2. MES North-West

3. MES Western Siberia

4. MES Siberia

SS  - 196 / 95,999 MVA

SS - 100/ 38,622  MVA

SS - 84 / 36,800 MVA

PTL - 463 / 28, 971 km

PTL - 278 / 14,516km

PTL - 193 / 13,283 km

PMES
Valdaiskoye
Verkhne-Donskoye
Volga-Donskoye
Volga-Okskoye
Vologodskoye
Moskovskoye
Priokskoye
Chernozemnoye

PMES
Bryanskoye
Vyborgskoye
Karelskoye
Leningradskoye
Novgorodskoye
Severnoye

PMES
Vostochnoye
Tsentralnoye
Yuzhnoye
Yamal-Nenetskoye 

SS - 118 / 44,271 MVA

PTL - 332 / 24,210 km

PMES
Zabaikalskoye
Zapadno-Sibirskoye
Krasnoyarskoye
Kuzbasskoye
Omskoye
Tomskoye
Khakasskoye 

1

6

2

7

5

5. MES South

6. MES Volga

7. MES Ural

8. MES East

3

SS - 143 / 27,476 MVA

SS - 88 / 32,254 MVA

SS - 105 / 41,894 MVA

SS - 90 / 14,820 MVA

PTL - 346 / 12,120 km

PTL - 185 / 12,486 km

PTL - 242 / 16,520 km

PTL - 192 / 16,689 km

PMES
Kaspiiskoye
Kubanskoye
Rostovskoye
Stavropolskoye
Sochinskoye

PMES
Nizhne-Volzhskoye
Sredne-Volzhskoye
Samarskoye
Nizhegorodskoye

PMES
Permskoye
Sverdlovskoye
Yuzhno-Uralskoye
Orenburgskoye

PMES
Amurskoye
Primorskoye
Khabarovskoye 

8

4

Federal Grid Company collects and processes 
information about electricity transmission along 
140 cross-border electricity transmission lines.

Unified 
National 
Electric Grid 
(UNEG) 

power 
transmission 
lines 0.4-750 kV (PTL)

2 231 units/
138.8  
*
thousand km

substations 
6-1150 kV 
(SS) 

*
924 units
/
332,133 MVA  

International Operations

Cross-border electricity transmission 
lines that cross the state border of the 
Russian Federation meet the statutory 
criteria of treating electric grid facilities 
as UNEG facilities.

Federal Grid Company facilitates the 
transit of the Russian electricity through 
electric grids of foreign states being a a 
technical contactor under commercial 
contracts of importers and exporters on 
the WECM and, pursuant to the contracts 
with JSC Inter-RAO UES and JSC TGC-
1, provides services on electricity 
transmission throughout Russia and right 
up to its borders via electric grid facilities 
that are integrated into UNEG and legally 
owned or possessed by the Company. 

There are currently several agreements 
in force, stipulating parallel operation 
of the Russian UES with the electric 
power systems of foreign states. The 
parties to these agreements are Federal 
Grid Company and economic entities 
of Georgia, Kazakhstan, the Baltic 
countries and the Republic of Belarus. 
The Company also signed an Inter-
system Agreement with Finland. It also 
signed agreements on technical support 
of parallel operations with Ukraine, the 
Republic of Belarus, Azerbaijan and 
Mongolia.

•   Being an organisation that manages 

cross-border electricity transmission 
lines, Federal Grid Company:

•  coordinates commercial contracts for 
the import/export of electricity and 
provides their engineering support 

•  arranges and implements commercial 
metering of electricity transmitted 
along cross-border electricity 
transmission lines

•  measures actual volumes of electricity 
that has been transmitted across the 
State border, and arranges for their 
customs clearance.

20
20

* PTLs and SSs the ownership rights to which have been duly registered for Federal Grid Company and other 
owners, excluding leased PTLs and SSs with 10 kW voltage  and lower operating on the territory of Krasnodar 
Krai and the Far East Federal University on Russky Island  

Subsidiaries 
and Associates

Core Subsidiaries and 
Associates

As of 31 December 2014, Federal Grid 
Company had 21 subsidiaries and 
associates that operate in different 
industries, including those that support 
electric grid facilities (core subsidiaries 
and associates). 

JSC MUS Energetiki

JSC R&D Centre of FGC UES

JSC CIUS EES

JSC ESSK EES

JSC Elektrosetservis UNEG

100%

100%

100%

100%

100%

Index Energetiki – FGC UES LLC

100%

JSC Tomsk Trunk Grids

AO OES GruzRosenergo

JSC Kuban Trunk Grids

52%

50%

49%

21
21

of Federal Grid 
Company 

branches 

Electric Grid 
Enterprises 
(PMES)

51 regional 
41 Backbone 
1 Technical 
1 Special Purpose 
8 Backbone 

Electric Grids 
(MES)

Supervision 
Centre 

Production Centre 
“Bely Rast”

STRATEGIC OVERVIEW  PERFORMANCE RESULTS

When improving reliability, efficiency and safety of 
electric grid infrastructure, Federal Grid Company 
recognises the importance of comprehensive 
modernisation, new technological capabilities and 
customer orientation in the delivery of services. All this 
involves the Company’s active role in the processes of 
innovative economic development and investments.

O A C H   +  MODER

N

I

S

R

P

P

D A

E
T
N
E
I
R
O
-
R
E
M
O

T

S

U

C

+

Y

T

I

L

I

B

RELIA

A

T

I

O

N

+

I

N

V

E
S
T
M
E
N
T
S

 + IN

N

O

V

A

T

IONS+

Technology

=

Infrastructure

+

Strategy

Reliability

Governance

+

+

Cooperation

OPER ATING PERFORMANCE   
ELECTRICIT Y TR ANSMISSION

The core activity and main revenue source 
for Federal Grid Company is the elec-
tricity transmission through the Unified 
National Electric Grid (‘UNEG’).

The cost of electricity transmission ser-
vices is based on tariffs that are set by the 
Russian Federal Tariff Service (FTS) and 
includes:

•  the cost of electricity losses in UNEG 
allowed by the relevant technological 
standards in the Russian regions. 

In accordance with Russian laws, Federal 
Grid’s services of electricity transmission 
via UNEG are monopoly operations regu-
lated by the State.

•  the cost of electricity transmission for 
the maintenance of electric grid facili-
ties that are part of UNEG;

In 2014, the volume of electricity 
transmission services to consumers 
via UNEG amounted to 515,250 mil-
lion kWh, down by 0.9% from 2013.

Volume of Services Provided by Federal Grid in 2010-2014*

530,000

520,000

510,000

500,000

490,000

480,000

470,000

460,000

450,000

Electricity losses in UNEG, %

Supply of Electricity from UNEG, mln kWh

4.72

517,131

519,983

515,250

4.56

509,287

4.43

4.24

4.28

493,570

4.13

468,302

2009

2010

2011 

2012

2013

2014

5.00%

4.80%

4.60%

4.40%

4.20%

4.00%

3.80%

3.60%

3.40%

3.20%

3.00%

* relative value for 2009-2011 was recalculated to comparable conditions

Federal Grid enters into direct contracts with customers. The number of counterparties has been increasing steadily because 
of new technological connections to UNEG and phased discontinuation of the “last mile” principle.1. 

A

Federal Grid at Wholesale Electricity and Capacity Market (WECM) 

C

%

Since 01.01.2006, Federal Grid, 
on its own, has been purchasing 
electricity on the WECM to 
B
compensate for actual UNEG 
losses net of losses that have 
been measured and paid for in 
equilibrium prices by the WECM 
participants.

Объекты по производству электроэнергии

Распределительные сетевые компании

ATS, JSC CFR and the seller of 
6%
electricity and capacity.
44%

Потребители (крупный бизнес – ТЭК, 
металлургия, строительство и т.п.)

C

A

B

Since 01.01.2011, Federal Grid 
has been purchasing electricity 
and capacity at free (non-
regulated) prices in accordance 
with the wholesale market’s 
rules. Purchases of electricity and 
capacity on the wholesale market 
for compensation of losses in 
the non-pricing zones are made 
under quadripartite contracts by 
and between JSC FGC UES, JSC 

50%

The price of electricity and 
capacity that Federal Grid 
purchased to compensate for the 
losses, in 2014 RUB11.81 billion 
net of VAT, including RUB4.15 
billion (net of VAT) for electricity 
and RUB7.66 billion for capacity 
(net of VAT).

Number of Process Disturbances Caused by Employee Errors

1 The “last mile” principle is a form of cross-subsidisation where large industrial customers that are connected directly to Federal Grid Company’s transmission grids 
pay an additional tariff for distribution grids of IDGCs to which some of the Company’s capacity (the “last mile”) are leased.

61

23

19

4,858

6,000

5,000

4,000

3,000

2,000

1,000

3,565

3,090

2,768

2,042

2010 

2011 

2012 

2013 

2014

57

12

39

9

19

4

2013

18

4

2014

2010

2011

2012

All employees

Operatingemployees

Rate of Process Disturbances Caused by Operating Employee Errors

0,032

0,020

0,033

0,012

0,026

0,008

2010

2011

2012

2013

2014

0,016

0,003

0,014

0,003

Таrget

Actual

A

B

%

K

C

D

E

F

G

H

I

J

A

B

C

D

E

F

G

H

I

J

K

ОАО «Тюменьэнерго»

ОАО «МРСК Центра»

ОАО «Ленэнерго»

ОАО «Кубаньэнерго»

ОАО «Московская объединенная электросетевая компания»

9,18%

ОАО «МРСК Урала» - «Свердловэнерго»

ОАО «Дальневосточная распределительная сетевая компания»

3,07%

ОАО «МРСК Урала» - «Челябэнерго»

ОАО «РУСАЛ Красноярский алюминиевый завод»

ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»

Прочие

9,72%

9,65%

4,48%

4,40%

3,27%

3,01%

2,21%

2,14%

48,87%

Динамика удельной аварийности на объектах ФСК 

3.01

2.52

2.13

1.79

1.47

2010

2011

2012

2013

2014

3,260

2,871

2,596

2,286

1,954

2010 

2011 

2012 

2013 

2014

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсонал 
 
 
 
530,000

520,000

510,000

500,000

490,000

480,000

470,000

460,000

450,000

Electricity losses in UNEG, %

Supply of Electricity from UNEG, mln kWh

4.72

517,131

519,983

515,250

4.56

509,287

4.43

4.24

4.28

493,570

4.13

468,302

2009

2010

2011 

2012

2013

2014

5.00%

4.80%

4.60%

4.40%

4.20%

4.00%

3.80%

3.60%

3.40%

3.20%

3.00%

A

B

%
%

K

C

D

E

F
G
H

I

J

A

Share of Federal Grid’s Largest Customers in Terms  
9,72%
of Revenues from Electricity Transmission Services, 2014
9,65%

ОАО «Тюменьэнерго»

ОАО «МРСК Центра»

B

ОАО «Московская объединенная электросетевая компания»

9,18%

JSC Tyumenergo

ОАО «МРСК Урала» - «Свердловэнерго»

JSC IDGC Centre

ОАО «Ленэнерго»

JSC MOESK

ОАО «Кубаньэнерго»
JSC JDGC Ural-Sverdlovenergo

ОАО «Дальневосточная распределительная сетевая компания»

3,07%

JSC Lenenergo

ОАО «МРСК Урала» - «Челябэнерго»

JSC Kubanenergo

ОАО «РУСАЛ Красноярский алюминиевый завод»

JSC Far East Distribution Grid Company

ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»

K

JSC JDGC Ural-Chelyabenergo

Прочие

JSC RUSAL Krasnoyarsk Aluminium Plant

JSC IDGC Centre and Volga-Nizhnovenergo 

Others

C

D

E

F

G

H

I

J

A

B

C

D

E

F

G

H

I

J

K

9.72%

4,48%

9.65%

4,40%

9.18%

3,27%

4.48%

4.40%

3,01%

3.27%

2,21%

2,14%

3.07%

48,87%

3.01%

2.21%

2.14%

48.87%

A

%

C

B

A

B

C

Объекты по производству электроэнергии

6%

Распределительные сетевые компании

Потребители (крупный бизнес – ТЭК, 

металлургия, строительство и т.п.)

44%

50%

4,858

6,000

5,000

4,000

3,000

2,000

1,000

3,565

3,090

2,768

2,042

2010 

2011 

2012 

2013 

2014

2010

2011

All employees

61

19

57

12

Динамика удельной аварийности на объектах ФСК 

Among the Company’s branches, the largest volume of electricity is supplied by MES Centre (24%), MES Siberia 
(16%) and MES Ural (14%).

Operating Results of Federal Grid Company  in 2014

3.01

3,260

2,871

Federal Grid

2,596

2,286

1,954

Supply of Electricity* million kWh 

2.52

2.13

Electricity Losses

Million kWh

1.79

515,250

21,261

* Supply of electricity from the grid network to customers and related territorial network organisations within balance sheet and operational attribution 

2010

2011

2012

2013

Electricity Supply to Neighbouring Countries

2010 

2011 

2012 

2013 

2014

Number of Process Disturbances Caused by Employee Errors

2010

2011

2012

2013

2014

%
1.47

2014

4.13%

Growth
2014/2013

Net supply of electricity via UNEG to neighbouring countries 
(according to WECM’s data), million kWH

15,716

19,285

15,769

12,974

10,572

- 18.5%

Reducing Electricity Losses

39

19
Actual Electricity Losses in 2013-2014
4

18
4

2014

Operatingemployees

2013
Rate of Process Disturbances Caused by Operating Employee Errors

2010

2011

2012

TECHNOLOGICAL CONNECTION

Client-Oriented Approach in Developing 
High-Quality Services

Technological connection is a service 
package which the Company offers to con-
nect electricity consumers’ power receiv-
ers, electricity producing facilities and grid 
facilities to Federal Grid’s  electric grids. 

We provide technological connection 
services to new and existing customers 
if the latter need to change the operating 
parameters of their power facilities. Our 
objective is to synchronise the develop-

ment of industry across the country with 
the potential of the backbone electric grid 
complex and to prevent the risk of excess 
investment.

Management Board that is designed 
to increase the efficiency of such 
operations and increase utilisation of 
transformer capacity.”

The Company’s activities on 
technological connection in recent 
years have been loss-making. 
What are the possibilities for 
changing this situation?

“If you look at technological 
connection as a separate business 
process, it would inevitably be 
loss-making, since for the actual 
connection of a consumer in most 
cases you need significant capital 
expenditure, including those relating 
to the changes in the grid’s topology, 
increase in transformer capacity and 
schemes of external power supply. 

However, technological connection is 
a comprehensive service and should 

be looked at in the context of Federal 
Grid’s core activity, i.e. transmission 
of electricity via trunk grids. Since 
completed connection projects 
lead to contractual relations with 
customers in respect of electricity 
transmission, in the medium- and 
long-term, the connection activities 
bring profit.

Moreover, in order to increase 
revenues from technological 
connection services, we are 
implementing a plan approved by the 

Alexey Molsky 
Deputy Chairman of the Federal 
Grid’s Management Board

9

2012

Actual electricity losses in the Company’s 
2013
grids in 2014 amounted to 21,261 million 
kWh, down by 1,001 million kWh compared 
to the previous year. The relative level 
of 2014 losses was 4.13% of electricity 
supplied by the grid. As compared to 2013, 
it decreased by 0.15 percentage points and 
for the preceding 5-year period, by 0.43 
percentage points. The reduction of losses 
was driven by the optimum load of the 
transmission grid and by measures taken 
as implementation of the programme for 
reducing electricity losses.

0,020

0,032

2010

The measures to reduce electricity losses 
for the reporting period were approved as 
part of the Programme for Energy Saving 
and Improving Energy Efficiency of Feder-
al Grid Company. They were implemented 
in three key areas:

Таrget

2014

Growth
2014/2013

In 2014 Federal Grid signed 2261 agree-
ments for technological connection with 
consumers, distribution grid companies 
and generation companies, down by 

65% from 2013. The key factor contrib-
uting to the decrease of the number of 
agreements signed was the regulatory 
limitation in respect of the applications 

for technological connection for voltage 
class below 110 KW and the economic 
situation in Russia.

million kWh 

22,526

22,553

21,946

22,262

21,261

- 1,001

Key Indicators for  Technological Connection

0,033

%

4.56

4.43

0,026

4.24

4.28

4.13

0.15 p p

2010

2011

2012

2013

2014

•  optimisation of scheme and mode pa-

0,012

0,008

2011

rameters in the process of the running 
and operational management of electric 
grids;

2012

0,016

•  construction, reconstruction and devel-
opment of electric grids, and commis-
sioning of energy-saving equipment. 

2013

2014

0,003

Actual

•  cutting of electricity consumption for 

substation needs;

As a result of implementing the above meas-
ures, electricity losses were reduced in 2014 
by 96.1 million kWh (while the target number 
was 90.1 million kWh)

0,014

0,003

Number of counterparties – new technological 
connection

252

149

315

652

226

Capacity as per Technological Connection 
Agreements MW

9,936.5

4,375.9

6,580.8

14,993 

4,828.1

1 The number of contracts with direct consumers, regional grid companies and electricity production facilities.

24

25

In the reporting year, the total maximum 
capacity for technological connection of 
consumers and distribution grid compa-
nies was 3.8 GW, and 1.8 GW for electricity 
production facilities. 

PERFORMANCE RESULTS / OPERATING PERFORMANCE530,000

520,000

510,000

500,000

490,000

480,000

470,000

460,000

450,000

530,000

520,000

510,000

500,000

490,000

480,000

470,000

460,000

450,000

Electricity losses in UNEG, %

Supply of Electricity from UNEG, mln kWh

4.72

517,131

519,983

515,250

4.56

509,287

4.43

4.24

4.28

493,570

4.13

468,302

2009

2010

2011 

2012

2013

2014

Electricity losses in UNEG, %

Supply of Electricity from UNEG, mln kWh

5.00%

4.80%

4.60%

4.40%

4.20%

4.00%

3.80%

3.60%

3.40%

3.20%

3.00%

530,000

520,000

4.72

Electricity losses in UNEG, %

4.56

517,131

519,983

515,250

Supply of Electricity from UNEG, mln kWh
509,287

510,000

A
500,000

4.72

490,000

480,000

4.56

450,000

2009

468,302

515,250

5.00%

4.80%

Client-Oriented Approach  

4.43

517,131

509,287

519,983

4.24

4.28

4.60%
4.13
4.40%

493,570

Federal Grid focuses its 
efforts on increasing the 
4.43
transparency and accessibility 
A
of the technological connection 
B
to the grids. The Company is 
C
implementing an action plan 

4.24

Потребители (крупный бизнес – ТЭК, 
металлургия, строительство и т.п.)

Объекты по производству электроэнергии
4.28

“Increasing the Accessibility 
of the Power Infrastructure” 
approved by the Russian 
6%
4.00%
Government, which provides for 
reduced timelines and stages 
3.80%
of technological connection.

4.20%

44%

50%

4.13

Распределительные сетевые компании

3.60%

2010

2011 

2012

2013

2014

3.40%

3.20%

3.00%

2009

2010

2011 

2012

2013

2014

C

470,000

%
%

460,000

468,302

493,570

B

5.00%

4.80%

4.60%

4.40%

4.20%

4.00%

3.80%

3.60%

3.40%

3.20%

3.00%

A

B

%

C

D

E

F

G

H

I

J

A

B

C

D

E

F

G

H

I

K

ОАО «Московская объединенная электросетевая компания»

9,18%

ОАО «МРСК Урала» - «Свердловэнерго»

ОАО «Тюменьэнерго»

ОАО «МРСК Центра»

ОАО «Ленэнерго»

ОАО «Кубаньэнерго»

ОАО «Дальневосточная распределительная сетевая компания»

3,07%

ОАО «МРСК Урала» - «Челябэнерго»

ОАО «РУСАЛ Красноярский алюминиевый завод»

Electricity losses in UNEG, %

Supply of Electricity from UNEG, mln kWh

ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»

J

9,72%

9,65%

4,48%

4,40%

3,27%

3,01%

2,21%

2,14%

48,87%

29

Прочие

517,131

519,983

515,250

5.00%

4.80%

4.60%

4.40%

4.56

509,287

B

4.43

K

4.72

530,000

520,000

510,000

500,000

C
490,000
IMPROVING RELIABILIT Y
480,000

493,570

D

A

B

A

470,000

%
Reliability as a Strategic Priority 
C

468,302

460,000

B

3,260

D

E

2,871

2010
2,286

%2009

Ensuring reliable electricity supply to 
450,000
2,596
our consumers is one of our priorities. 
K
Maintaining a high level of reliability and 
F
1,954
reducing the volume of uncovered demand 
G
for electricity have been established as 
H
strategic objectives by the Long-Term Pro-
I
gramme for the Development of Federal 
Grid for 2015-2019. Our Company strives 
to ensure continuous growth and improve-
ment and makes significant efforts to in-
crease the reliability of UNEG’s operation. 
2012 

2011 

2013 

2014

K

J

2010 

A

A

B

C

ОАО «Тюменьэнерго»

9,72%
Динамика удельной аварийности на объектах ФСК 
4.24
9,65%

ОАО «МРСК Центра»

4.00%

4.28

4.20%

4.13
ОАО «Московская объединенная электросетевая компания»

3.80%

ОАО «Дальневосточная распределительная сетевая компания»

3,07%

E

C

A

D

E

2.52

3.40%

3.60%

9,65%

9,72%

F
G
H
2011 
I

ОАО «МРСК Урала» - «Свердловэнерго»

D
ОАО «Тюменьэнерго»
E
ОАО «Ленэнерго»
ОАО «МРСК Центра»
3.01
F
ОАО «Кубаньэнерго»
ОАО «Московская объединенная электросетевая компания»
G
ОАО «МРСК Урала» - «Свердловэнерго»
In the reporting year, we continued to take 
regular efforts to reduce the accident rate 
H
2013
2012
ОАО «Ленэнерго»
and have achieved visible results in this 
J
I
ОАО «Кубаньэнерго»
area.
J
ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»
3,07%
ОАО «Дальневосточная распределительная сетевая компания»
As compared with the previous year, the 
2014
2012
K
3,01%
ОАО «МРСК Урала» - «Челябэнерго»
accident rate at Federal Grid’s facilities 
went down by 14.5%, although the mainte-
nance workload (number of electric facili-
ties) has been consistently increasing.

3.00%
In 
1.79
2014 accident 
rate at Federal 
Grid’s facilities 
decreased compared to 
the previous year by
2013

18%

ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»

ОАО «РУСАЛ Красноярский алюминиевый завод»

ОАО «РУСАЛ Красноярский алюминиевый завод»

ОАО «МРСК Урала» - «Челябэнерго»

4,40%
1.47
3,27%

Прочие

2,21%

9,18%

4,48%

2,14%

3.20%

2014

2010

2011

2.13

H

G

F

J

I

3,01%

2,21%

2,14%

48,87%

9,18%

4,48%

4,40%

3,27%

K

K

Прочие

48,87%

Динамика удельной аварийности на объектах ФСК 

Number of Process Disturbances Caused by Employee Errors

Breakdown of Federal 
Grid’s Technological 
Connection Services 
(based on Signed 
Agreements)

A

B

C

Electricity production 
facilities

Distribution grid companies

44%

A

C
Consumers (large 
businesses in Fuel & 
Energy, Metallurgy, 
4,858
Constructions and others

6,000

5,000

%

50%

A

6%

In 2014, Federal Grid met the targets 
established by the FTS of Russia relating to 
the quality of services provided in respect of 

technological connection to the Company’s 
electric grids. The service quality indicator 
was 1.152 (whereas the target was 1.2040).

61

Service Quality Indicators Set by FTS  for 2011–2014
(order No. 486-e/3 dated 28 December 2010)

Объекты по производству электроэнергии

A

Regulation period
19

6%

Распределительные сетевые компании
2010

2011 

2012 

2013 

44%

2014

2011

Quality indicator for technological connection services 

Потребители (крупный бизнес – ТЭК, 
металлургия, строительство и т.п.)

1.2599  

50%
1.2410  
All employees

1.2224  

Объекты по производству электроэнергии

6%

1.2040  

Operatingemployees

2,871

B

B

C

3,565

4,000
C

3,000

2,000

%

2,042

3,090
B

A

B

C

2,768

Распределительные сетевые компании

Потребители (крупный бизнес – ТЭК, 
металлургия, строительство и т.п.)

44%

50%

C

57

12

%

3,260

3,260

2012

Total accidents at Federal 
Grid’s facilities

Accident rate at Federal Grid’s 
facilities 

A

Объекты по производству электроэнергии

Динамика удельной аварийности на объектах ФСК 

6%

3,260

39

2,871
9

B

2,596

B

C

19
4

2,286
2013

3.01
Распределительные сетевые компании

Потребители (крупный бизнес – ТЭК, 
металлургия, строительство и т.п.)
–16%

1,954

2014

18
4
3.01

44%

2.52

50%

–15%

2.13

–16%

–18%

1.79

1.47

Rate of Process Disturbances Caused by Operating Employee Errors

2010

2011

2,596

2.52

2.13

2,286

1,954

2012

1.79

2013

1.47

2014

2010 

2011 

2012 

2013 

2014

Number of Process Disturbances Caused by Employee Errors

2010 

2011 

0,032

2012 

2013 

0,033

2014

2010

2011

2012

2013

2014

Federal Grid’s Major Technological Connection Projects in 2014

1,000

2010 

2011 

2012 

2013 

2014

Number of Process Disturbances Caused by Employee Errors

0,020

0,012

0,026

0,008

Consumer

JSC OGK- 1, Tyumen oblast

CJSC Nizhnevartovskaya Hydro Power Station, Tyumen oblast

6,000

JSC Fortum, Tyumen oblast

5,000

4,858

JSC Kuzbassenergo, Kemerovo oblast

4,000

6,000

LUKOIL-Astakhanenergo LLC, Astrakhan oblast
4,858

3,000

5,000

Nizhny Novgorod Branch of JSC TGK-6, Nizhny Novgorod oblast

2,000

4,000

2,042

3,565

Novokuznetskaya GTPP

3,090

2,768

2010
CCGT-235 of Tsentralnaya Boiler Unit

3,565

Novogorkovskaya Heat and Power Plant

All employees

JSC Mobilnye GTES, Krasnodar Territory

3,000

2010 

1,000

3,090

2011 

2,768

2012 

2013 

2014

Power Plant (90 MW of capacity)

2,000

2,042

EvroKhim – VolgaKaliy LLC, Volgograd oblast

1,000

Mining and Processing Works 
(at the Gremyachinsk potash salts deposit)

Lafarge GEO LLC, Kaluga oblast

Cement Processing Plant

2010 

2011 

2012 

2013 

2014

Nefteyugansk Branch of Salym Petroleum Development N.V, Tyumen oblast

Salym Field

JSC RusHydro, Samara oblast 

Zhiguli Hydro Power Station

JSC Kamensk Uralsky Metallurgical Works, Sverdlovsk oblast

Metallurgical works

235

188

90

86.5

55.5

40

31.5

20

Facility

Capacity,
MW

Urengoyskaya Hydro Power Station

61
490

57

Number of Process Disturbances Caused by Employee Errors

6,000

Таrget

Nizhnevartovskaya Hydro Power Station, 
Power Unit No 3.1

CCGT-3, Nyaganskaya Hydro Power Station

61
2010

431
19

422

5,000

4,858

4,000

12

57
2011

3,000

39

9
3,090

19
4

3,565
2013

2,768

2010 

2011 

2012 
Undersupply of electricity, 
MWh

2010

2013 

2014

2011

Actual

2012

39
2,042

9

19

All employees

298

2,000
Operatingemployees

12

Rate of Process Disturbances Caused by Operating Employee Errors

19
4

2011

1,000

2012

2010 

2011 

2012 

2013
2013 

2014

0,016

61

57

0,003

2012

The reliability of Federal Grid’s grids has been increasing every 
year thanks to the introduction of new equipment and improve-
ment of skills and professionalism of the maintenance person-
nel. Undersupply of electricity to consumers (as per reports on 
the investigation of accidents) is consistently low and tends to 
decline.

2013
19

2010

2011

12

2014

18
4

2014

The insignificant increase in undersupply observed during the 
reporting year was due to ground fire outbreaks outside the 
exclusion zone of 500 kV Amurskaya – Kheykhe (MES East) OHL 
during the period from 14 April to 2 May 2014. The level of the 
above mentioned undersupply represented 55% of the total Fed-
eral Grid’s undersupply for the year.
2014

18
4

All employees

Operatingemployees

Operatingemployees

Rate of Process Disturbances Caused by Operating Employee Errors

0,032

0,033

Federal Grid’s Technical Policy

0,032

2010

0,020

Таrget

Implementation of the  
0,020
Unified Technical Policy 
approved by the Board  
of Directors of Federal  
Grid in 2013 shall help us  
improve the electric grid  

2010

Таrget

0,026

0,008

2012

0,026

0,008

0,016

0,003

2013

0,016

0,003

0,014

0,003

2014

0,014

0,003

2013

2014

0,012

0,033

0,012

Actual

2011
complex’s efficiency, 
reduce its operational cost, 
strengthen the system-wide 
reliability of UNEG and meet 
the increasing demand 
Actual
for electricity.

2011

2012

A

B

%

C

D

E

F

G

H

I

J

A

B

C

D

E

F

G

H

I

J

K

ОАО «Московская объединенная электросетевая компания»

9,18%

ОАО «МРСК Урала» - «Свердловэнерго»

ОАО «Тюменьэнерго»

ОАО «МРСК Центра»

ОАО «Ленэнерго»

ОАО «Кубаньэнерго»

ОАО «Дальневосточная распределительная сетевая компания»

3,07%

ОАО «МРСК Урала» - «Челябэнерго»

ОАО «РУСАЛ Красноярский алюминиевый завод»

ОАО «МРСК Центра и Приволжья» - «Нинжновэнерго»

Прочие

9,72%

9,65%

4,48%

4,40%

3,27%

3,01%

2,21%

2,14%

48,87%

Динамика удельной аварийности на объектах ФСК 

2,871

2,596

2,286

1,954

3.01

2.52

2.13

1.79

1.47

2010

2011

2012

2013

2014

Rate of Process Disturbances Caused by Operating Employee Errors

0,032

0,020

0,033

0,012

0,026

0,008

2010

2011

2012

2013

2014

0,016

0,003

0,014

0,003

Таrget

Actual

0,014

0,003

39

9

2012

19

4

2013

18

4

2014

26

27

PERFORMANCE RESULTS / OPERATING PERFORMANCEFixed Assets Renovation Programme 

The Fixed Assets Renovation Programme 
is aimed at ensuring the reliable and 
efficient functioning of the electric 
grid complex. It was included in the 
Company’s Investment Programme for 
2015-2019 approved by the Order of the 
Russian Energy Ministry No 807 dated 
31.10.2014.

The draft of the Renovation Programme 
for 2015-2019 stipulates financing of 
RUB 111.27 billion, commissioning of 
facilities with a total capacity of 12.395 
MVA and reconstruction of 788,61 km of 
transmission lines.

The Company energised 12 completely 
reconstructed facilities and 228 partially 
reconstructed facilities and comprehen-
sive investment programmes.

For 2015, the Renovation Programme 
envisages commissioning of 535 MVA of 
capacity and reconstruction of 1.7 km of 
electricity transmission lines for the total 
amount of RUB 22.43 billion.

Most Significant Reconstruction Projects Implemented in 2014

330 kV Vladikavkas-2 SS

Reconstruction and 
re-equipment of
500 kV Tikhoretskaya SS

500 kV Kuybyshevskaya SS

Substation 330 kV Vladikavkaz-2 provides electric power supply for large industrial enterprises of 
the Republic of North Ossetia, including JSC Elektrotsink and BOR – Energosbyt LLC and is also 
used for transit of power from Stavropol Krai to the Chechen Republic and Dagestan.

In 2014, the reconstruction included replacement of autotransformer AT-3 with the capacity  
of 200 MVA.

Substation 500 kV Tikhoretskaya in Krasnodar Krai is a hub facility connecting the power system 
of Kuban with Stavropolskaya HPP , Novocherkasskaya HPP and Volgodonskaya NPP. The 
comprehensive reconstruction of this facility (in 4 stages) significantly increases reliability of power 
supply to consumers in the Krasnodar Krai.

In 2014, as part of the reconstruction, new autotransformers with the capacities of 125 МVА and 25 
МВА were commissioned. As a result, the capacity of this facility increased to 2,641 MVA.

Substation 500 kV Kuybyshevskaya with installed capacity of 1,602 MVA supplies over 70% of 
Samara oblast with electric power and links Samara oblast’s power system with such power 
facilities as Zhigulevskaya HPP, Zainskaya HPP and Balakovskaya NPP. 

In 2014, after reconstruction two autotransformer groups with the capacity of 801 MVA each were 
commissioned, which help significantly increase reliability of power supply in the region and create 
conditions for connecting new customers to the power system.

What is meant by reliability in 
the context of Federal Grid’s 
core operations – transmission 
of electricity and how does the 
Company ensure reliability?

“Reliability in our work means 
uninterrupted power supply 
provided to our consumers, 
reduction of electricity losses 
in the grids and provision of our 
customers with high-quality 
services.

Maintaining a high level of reliability 
is one of the goals of National Grid’s 
long-term development and we 
make significant efforts to meet 

Vladimir Dikoy
Deputy Chairman of the 
Management Board, Chief Engineer, 
member of the Management Board 
of Federal Grid Company

this goal. Reliability is ensured both 
by modernisation of Federal Grid’s 
infrastructure and by effective and 
efficient technical maintenance and 
repair of electric grid equipment. 
In 2014, we invested over RUB 
11 billion in implementing these 
measures.

Another important area of ensuring 
reliability is well-coordinated 
operation during the so-called 
‘special periods’, when the load on 
the system is higher due to seasonal 
factors and weather and climatic 
conditions. First, we prepare for 
operation during such periods in 
advance and, second, we address 
any technological problems in the 
grids operation if they arise as 
promptly as possible.”

Repairs Programme

The Repairs Programme aims to provide 
technical maintenance and repairs at 
Federal Grid’s power facilities in order to 
ensure that equipment of substations and 
high-voltage lines is in good working con-
ditions, that there are no accidents during 
the autumn/winter period and to ensure 
reliable operation of UNEG as a whole.

Repairs Programme for UNEG facilities 
has been developed based on the results 
of diagnostics and analysis of technical 
condition of the equipment in line with the 
relevant regulations and specifications, 
instructions of the manufacturers of the 

relevant equipment, local conditions 
and our experience of operating electric 
facilities.

All measures scheduled for mainte-
nance, repairs and diagnostics were 
implemented in full:

•  We repaired 314 phases of transform-
er equipment, 2,026 on-/off switches, 
14,761 phases of disconnectors and 124 
compressors

In total, in 2014 we spent RUB 11.7 billion 
on technical maintenance and repairs.

•  We cleared 49,573 hectares of high-volt-
age electricity transmission line paths 

•  We replaced 235,1112 insulators at 

high-voltage lines, 269 of ground-wire 
cables and 183 supports for high-volt-
age transmission lines

RUB

11.7

bln
were spent in 
total on technical 
maintenance and 
repairs

Operation during Special Periods

Weather and climatic conditions make a 
strong impact on Federal Grid’s opera-
tions. therefore, we prepare electric grid 
equipment and facilities in advance for 
operation under low temperatures and 
peak loads occurring during the autumn/
winter period and in case of natural 
anomalies during periods of river floods, 
fires and thunderstorms. These are called 
“special periods” in our operation.

Using the experience of special periods in 
previous years, the Company developed 
and approved mandatory measures re-
lated to the preparation for and operation 
during special periods for all Federal 
Grid’s branches – MESs and PMES, as 
well as additional measures to ensure the 
reliable operation of electric grid facilities 
taking into account local conditions.

The areas of efforts to ensure reliable op-
eration of Federal Grids facilities during 
special periods are as follows:

•  Federal Grid operates on a permanent 
basis 50 duty stations, whose objective 
is to ensure reliable operation of the 
Company’s facilities during any emer-
gency or other contingency situations 
and in cases where there is a threat of 
disruption of the course or efficient or-
ganisation of emergency and recovery 
work at such facilities. 

•  Branch representatives take part in the 
work of duty stations set up in the fed-
eral subjects of the Russian Federation 
to electricity supply safety. 

Ensuring Reliable Power Supply in 2014

During the reporting year, 
Federal Grid ensured reliable 
power supply of sports-related 
and infrastructure facilities 
during 22nd Olympic Games 
and 11th Paralympic Winter 
games in Sochi, functioning of 

electric grid facilities used by 
the St. Petersburg International 
Economic Forum and other big 
events. The Company met all 
of its obligations and related to 
providing reliable power supply to 
its customers.

tors, which are involved, whenever 
necessary, in emergency and recovery 
efforts at the grid facilities. It also 
entered into 65 agreements with 
RosHydroMet and 89 agreements with 
the Russian Ministry of Emergency 
Situations.

•  A sufficient emergency reserve has 

been created including a pool of large 
units.

•  The Company and subsidiaries of JSC 

Russian Grids arranged regular sharing 
of information about the existing emer-
gency reserve and its locations, the 
information of its status and additions 
to the reserve is constantly updated.

•  The status of transmission lines is 

video-archived during their inspections, 
walk-arounds and fly-arounds. 

•  The Company has 544 back-up sources 
of power with total capacity of 169.5.

a certificate No 70-2014 confirming the 
Company’s readiness for operation during 
the 2014-2015 autumn/winter period.

Federal Grid’s 
own resources for 
emergency and 
recovery work

580

Emergency teams
including in total

5,700people

28

29

•  Our Company entered into 120 agree-
ments on co-operation with contrac-

On 7 November 2014, the Commission 
of the Russian Ministry of Energy issued 

PERFORMANCE RESULTS / OPERATING PERFORMANCEOperational Process Control 

DE VELOPMENT OF COMMUNICATION NE T WORK S AND IT SYSTEMS

Information Technology for Higher Effectiveness

Operational process control in the Company 
is aimed at ensuring the reliable operation 
of the UNEG facilities and adhering to the 
operating modes that are set by the System 
Operator’s control centres. Our objective is to 
comply with the quality and safety require-
ments when we operate the UNEG facilities. 

In 2014 all centres for the management 
of grids at branches of Federal Grid – 
PMESs – received operational roles 
relating to the management of electric 
grid facilities that are within the scope of 
PMESs’ operation and that were not part 
of the dispatch-management system.

The successful implementation of opera-
tional process control in 2014 is attested 
by the evolution of such indicators as the 
rates of process disturbances caused by 
operating employee errors and outage 
schedule implementation rate.

Reliability of UNEG, building a smart grid 
and effective management of the Com-
pany’s business are based on the use of 
advanced and modern information and 
communications technology.

Our Company has been building the Energy 
System’s Unified Process Communications 
Network (ESUPCN), which is designed 
to manage the technological processes 
involved in the production, transmission 
and distribution of electricity. The ESUPCN 
focuses on the digitalisation of the network 
and on making it smart.

In order to improve observability of 
the electric grid facilities and dispatch 
management, the strategic priority is to 
digitalise communication channels of the 
automated dispatch management system 

While implementing its IT 
strategy in accordance with 
the import substitution 
programme, Federal Grid 
Company prefers to use 
Russian-made equipment 
and software at all levels of 
technological management.

Digitalisation of the 
Динамика уровня цифровизации 
Federal Grid’s Electric 
электросетевых объектов ФСК
Grid Facilities

63%

69%

47%

80%

60%

40%

20%

0%

Общая протяженность ВОЛС ФСК, 

тыс. км

Динамика ввода систем 

высокочастотной связи 

на подстанциях ЕНЭС, шт.

Динамика ввода систем 

коммутации телефонной 

связи на подстанциях ЕНЭС, шт.

54.0%

48.9%

40.3%

574

436

367

88

83

113

800

600

400

200

0

120

80

40

0

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

(ADMS) and automated process control 
system (APCS) at the level “Object – Dis-
patch Centre.”

Динамика объема финансирования инвестиций, 
млрд руб.

Number of Process Disturbances Caused by Employee Errors

61

57

39

Operating employees

All employees

19

12

9

2010 

2011 

2012 

19

18

4

2013 

4

2014

Rate of Process Disturbances Caused by Operating Employee Errors

0.032

0.033

0.026

0.020

0.012

Structure of the Uniform Communications Network in the Electric 
Power Industry and Technologies Employed in This Network

Динамика уровня цифровизации 
электросетевых объектов ФСК

Динамика введения на подстанциях 
ЕНЭС автоматизированных систем 
управления технологическими процессами, шт.

Динамика ввода систем 
высокочастотной связи 
на подстанциях ЕНЭС, шт.

Общая протяженность ВОЛС ФСК, 
Total Length of FOCN, 
тыс. км
thousand kilometers
83

Динамика введения на подстанциях 
ЕНЭС систем сбора и передачи 
информации, шт.
Fibre-optic communications 
network (FOCN)
69%
80
63%
This is the basic communications network 
for the energy system. It is based on the 
60
use of a fibre-optic cable which is sus-
pended on overhead electricity transmis-
sion lines. This helps to make process con-
40
trol of the electric network more efficient 
and improve reliability of power supply to 
20
customers.

40%

20%

60%

71

36

40.3%

47%

2012 

0
2013 

2014

2012 

2013 

2014

0%

200

54.0%

150

48.9%

109

100

50

80%

60%

40%

20%

0%

Таrget

Actual

Динамика уровня цифровизации 
электросетевых объектов ФСК

0.016

0.014

0.008

80%

0.003

63%

69%

0.003

Общая протяженность ВОЛС ФСК, 
High-frequency (HF) 
тыс. км
communications via electricity 
800
transmission lines

Динамика объема финансирования инвестиций, 
млрд руб.

Commissioning of HF 
Communications Systems at 
UNEG Substations

In 2014

2012 

Динамика ввода систем 
высокочастотной связи 
на подстанциях ЕНЭС, шт.

2013 

2014

0

2012 

In 2014
Federal Grid completed construction of FOCNs 
on transmission lines at the following facilities:

800

170

600

144

•  368 km – FOCN Urengoi Hy-

574
dropower Plant – Mangazeya 
SS, Kartopia – Nyagan 
400
Hydropower Plant SS in the 
responsibility area of MES 
Western Siberia branch

200

•  675 km – FOCN Kurgan SS –  
Vityaz SS, Voskhod SS– Vit-
yaz SS in the responsibility 
areas of MES Ural, Western 
2012 
Siberia and Siberia branches 

2013 

2014

0

•  225 km – FOCN Kalin-

436

inskaya Nuclear Power 
Plant – Novaya SS – 
Konakovo Hydropower 
Plant – Opytnaya SS in 
the responsibility area 
of MES Centre branch 

367

•  98 km – FOCN Gatchina 
SS– Luga SS in the re-
sponsibility area of MES 
North-West branch

2013 

2014

Динамика ввода систем 
коммутации телефонной 
связи на подстанциях ЕНЭС, шт.

In the reporting year, 
Federal Grid in-
stalled 367 half-sets 
of HF communica-
tions. The Company’s 
Динамика ввода мощностей
facilities now have 
11,690 such half-sets.

113

83

80

120

As part of new con-
struction and renova-
tion of the electric grid 
facilities, Federal Grid 
88
upgraded some HF 
communications system 
facilities and decom-
missioned some other 
equipment because 
FOCNs were operation-
alised. 

40

0

2012 

2010 

2011 

60%

47%
Динамика введения на подстанциях 
2012 
ЕНЭС систем сбора и передачи 
информации, шт.

2013 

40%

20%

60%

2014

Динамика введения на подстанциях 
40.3%
ЕНЭС автоматизированных систем 
управления технологическими процессами, шт.
20%

40%

54.0%

This process communications network 
48.9%
uses phase wires and cables of overhead 
transmission lines to carry signals, such 
as voice, telemechanics data, information 
from the automated systems of electric 
power control and recording (ASEPCR), 
and commands for relay protection and 
emergency automatic equipment that are 
0
Динамика ввода систем 
necessary for process control of electric 
2013 
170
power facilities in the normal and emer-
высокочастотной связи 
gency modes.
на подстанциях ЕНЭС, шт.

2012 

2014

600

400

200
167.0

C

574

436

367

184.7

179.9

149.7

Outage Schedule Implementation Rate

80
71
Динамика уровня цифровизации 
электросетевых объектов ФСК
60
95

98.6

98.5

95

36

98.5

95

80%

40

20
63%

83

0%

2012 

2013 

200

2014

150

0%

144

98.8

Общая протяженность ВОЛС ФСК, 
тыс. км

100
Таrget

109

95

69%

50

Динамика объема финансирования инвестиций, 
млрд руб.

Telephone communications 
network

Динамика введения на подстанциях 
ЕНЭС систем сбора и передачи 
информации, шт.

40%

20%

60%

47%

0

2012 

Динамика введения на подстанциях 
ЕНЭС автоматизированных систем 
управления технологическими процессами, шт.

40.3%

2013 

2014

40%

48.9%

20%

60%

Actual
0

54.0%

2012 

2013 

574

600

400

2014

436

Based on the radial and hub network 
principle, the power industry’s telephone 
communications network provides for 
interaction with the process network of 
the System Operator and other electricity 
B
market participants.

367

120

80

2010

40

184.7

179.9

2013 

2012 
2014
Динамика ввода систем 
90.9
коммутации телефонной 
связи на подстанциях ЕНЭС, шт.
A
B

Commissioning of Telephone 
Switching Systems at UNEG 
Substations

 A

%

113

C

88

83
2013
Динамика ввода мощностей

2012

2011

2014

Структура капитальных вложений за 2014 г., млрд руб.

2013 

2014

18.50

17.83

In 2014

11.84

Новое строительство

Техническое перевооружение и реконструкция 24.28 / 27%
nication, DECT 
wireless commu-
2.96
nications systems 
and loudspeaker 
and radio searching 
communications 
systems. 
Transformer capasity, thousand MVA

Federal Grid installed 
113 PABXs at the 
Прочее
electric grid facilities 
of its branches, as 
well as systems for 
recording operational 
personnel commu-

58.35 / 64%
3.64
8.23 / 9%

2010

2012

2011

2.81

Transission lines, thousand km

800

200
167.0

0

60%

40%

20%

0%

120

80

40

0

Динамика ввода систем 

коммутации телефонной 

184.7

связи на подстанциях ЕНЭС, шт.

167.0

179.9

149.7

88

83

113

90.9

2012 

2013 

2014

2010

2011

2012

2013

2014

Динамика ввода мощностей

18.50

17.83

11.84

2.81

2.96

3.64

10.79

3.69

9.52

3.12

2010

2011

2012

2013

2014

Transformer capasity, thousand MVA

Transission lines, thousand km

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

108.17

134.86

10.45

40.29

115.24

140

120

100

80

60

9.52

40

20

0

10.79

3.69

2013

2014

9.04

38.84

60.29

3.12

84.12

70.64

60.78

63.64

2015

2016

2017

2018

New Construction

Technical upgrade and reconstruction

2019

Other

 9.78

103.54

101.87

34.82

7.62

35.14

8.18

30.05

31

17.83

18.50

0

2012 

2013 

2014

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

83
0%

71

2011 

2012 

2012 

2013 

200
2014

2013 

0%

2014

170

2012 

2013 

2014

144

109
Динамика объема финансирования инвестиций, 
30
млрд руб.

150

100

50

0

80

60

40

20

0

36

200

150

100

50

0

83

71

36

80

60

40

20

0

Динамика введения на подстанциях 

Динамика введения на подстанциях 

2012 

2013 

2014

ЕНЭС систем сбора и передачи 

ЕНЭС автоматизированных систем 

информации, шт.

управления технологическими процессами, шт.

2012 

2013 

2014

C

Структура капитальных вложений за 2014 г., млрд руб.

2010

2011

Динамика ввода мощностей

2013

2012

2014

2010

2.81

120

2.96

108.17

3.64

Техническое перевооружение и реконструкция 24.28 / 27%

Transformer capasity, thousand MVA

Transission lines, thousand km

 A

184.7

179.9

167.0

%

149.7

90.9

B

A

B

C

Новое строительство

Прочее

11.84

18.50

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

17.83

20

70.64

60.78

63.64

2.81

2.96

108.17

2010

2011

134.86

3.64

10.79

10.45

40.29

2013

9.04

2012

38.84

2015

2016

2017

2018

3.69

115.24

3.12

 9.78

103.54

New Construction

Technical upgrade and reconstruction

101.87

2019

Other

2012 

2013 

2014

2012 

2013 

2014

 A

Структура капитальных вложений за 2014 г., млрд руб.

2010

2011

2012

2013

2014

Техническое перевооружение и реконструкция 24.28 / 27%

Transformer capasity, thousand MVA

Transission lines, thousand km

A

B

C

Новое строительство

Прочее

58.35 / 64%

8.23 / 9%

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

20

60.29

84.12

70.64

60.78

63.64

108.17

134.86

10.45

40.29

115.24

2015

2016

2017

2018

 9.78

103.54

101.87

New Construction

Technical upgrade and reconstruction

34.82

7.62

35.14

8.18

30.05

2019

Other

 A

C

%

B

Структура капитальных вложений за 2014 г., млрд руб.

Техническое перевооружение и реконструкция 24.28 / 27%

A

B

C

Новое строительство

Прочее

58.35 / 64%

8.23 / 9%

140

120

100

80

60

40

20

0

9.04

38.84

60.29

84.12

70.64

60.78

63.64

2015

2016

2017

2018

New Construction

Technical upgrade and reconstruction

2019

Other

170

144

109

C

%

B

140

100

2011

80

60

40

0

9.52

2014

34.82

134.86

10.79

10.45

3.69

9.52

115.24

3.12

 9.78

103.54

101.87

2014

34.82

7.62

35.14

8.18

30.05

9.04

2012

38.84

60.29

40.29

2013

84.12

7.62

35.14

8.18

30.05

149.7

2012 

2013 

2014

90.9

140

120

100

80

60

40

0

11.84

58.35 / 64%

8.23 / 9%

PERFORMANCE RESULTS / OPERATING PERFORMANCEAutomated Process Control System

PROCUREMENT

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

Динамика уровня цифровизации 

электросетевых объектов ФСК

63%

69%

47%

80%

60%

40%

20%

0%

Общая протяженность ВОЛС ФСК, 

тыс. км

54.0%

48.9%

40.3%

35

35

60%

40%

20%

0%

800

600

400

200

0

Динамика ввода систем 

высокочастотной связи 

на подстанциях ЕНЭС, шт.

Динамика ввода систем 

коммутации телефонной 

связи на подстанциях ЕНЭС, шт.

574

436

367

88

83

113

120

80

40

0

The automated process control system 
(APCS) is a Company-wide system for 
the management of UNEG operations and 
development, so it integrates the devices 
and systems for the automated dispatch, 
processing and operational activities of 
the Company’s administration and MES / 
PMES services.

In 2014, the Company began developing 
software & hardware complexes for 
Network Management Centres of MES 
Siberia and MES East; completed a pilot 
project of an integrated APCS for MES 
North-West; and implemented measures 
to improve observability of UNEG facilities 
at 83 substations.

The automated process control 
system allows both operational 
and non-operational functions 
to be performed by Electric 
Grid Control Centres, improves 
the efficiency of UNEG mode 
control by allowing a high 
level of observability, prevents 
outages and reduces the 
time for decision-making 
and the likelihood of errors 
by operational employees in 
emergency situations.

80

60

40

20

0

Installation of Data Input 
and Sharing Systems at 
UNEG SubstationsДинамика уровня цифровизации 

Динамика введения на подстанциях 
ЕНЭС систем сбора и передачи 
информации, шт.

электросетевых объектов ФСК

63%

47%

36

80%

83

71

60%

40%

20%

0%

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

Динамика введения на подстанциях 
Automated Process Control Systems
ЕНЭС систем сбора и передачи 
информации, шт.

Динамика введения на подстанциях 
ЕНЭС автоматизированных систем 
управления технологическими процессами, шт.

80

Automated process control systems are 
built in the process of comprehensive 
reconstruction and construction of new 
facilities. They help to ensure the utmost 
effectiveness of electricity transmission 
in the electric grid complex, improve 
36
reliability by reducing employees’ errors, 
and the transition to using the substations 
without operating personnel.

60

40

20

0

83

71

Installation of Automated Process 
Control Systems at UNEG Substations

200

150

100

50

0

C
170

144

109

 A

%

2012 

2013 

2014

2012 

2013 

2014

Transparency and Competitive Procurement

Динамика объема финансирования инвестиций, 
млрд руб.

The Company makes purchases proac-
Динамика введения на подстанциях 
tively in all regions where it operates. Its 
ЕНЭС автоматизированных систем 
procurement activities are targeted at 
Общая протяженность ВОЛС ФСК, 
purchasing the necessary equipment and 
управления технологическими процессами, шт.
тыс. км
services on the competitive market within 
its corporate investment programme, and 
at fulfilling its annual repairs and target 
programmes. 

The main document which regulates 
corporate procurement by Federal Grid 
is Regulations on the Procedure for 
Regulated Procurement of Goods, Works 
and Services. This is a fundamental doc-
ument for the organisation of regulated 
procurement on methodological basis, 
with up-to-date, competition-based 

167.0

170

200

800

54.0%

69%

forms of purchases that are mostly made 
through tenders.

Динамика ввода систем 
высокочастотной связи 
на подстанциях ЕНЭС, шт.
179.9

184.7

It is through the tendering procedures 
used for procurement in 2011-2013 that 
Federal Grid has managed to achieve 
annual cost savings in procurement at the 
level of 9-10% per unit.

149.7

600

574

60%
144

48.9%

436

367

90.9

150

100

50

0

109

Principles

40%

20%

0%

40.3%

2012 

400

200

0

Key objectives

2013 

2014

2012 

2013 

2014

2012

2013

Competitive 
purchasing as 
2014
share of total 
procurements of 
Federal Grid  
in 2014

• Openness 
Динамика объема финансирования инвестиций, 
• Competitiveness
млрд руб.
• Justification

• Optimise  the 
procurement 
management 
system on the basis 
of best practices in 
this field 

2010

goods, works and 
2011
services, including 
by minimising 
intermediary 
services 

• Reduce the 

184.7

179.9

167.0

Company’s costs by 
saving funds during 
the procurement of 

149.7

• Supply quality goods, 
works and services 
to the Company at 
minimal costs and 
strictly on time 

Структура капитальных вложений за 2014 г., млрд руб.
90.9

18.50

In 2014, the Company made competitive purchases to the total amount of RUB86.9 billion, that 
made up 92% of total procurement volume of Federal Grid.

Техническое перевооружение и реконструкция 24.28 / 27%

11.84

A

B

C

Новое строительство

Прочее

2014 Regulated Procurements by Type
2011

2010

2013

2012

2014

58.35 / 64%

8.23 / 9%

2.81

2010

92%

140

120

100

80

60

2.96

40

20
2011

108.17

17.83

9.04

38.84

3.64

60.29

Динамика ввода мощностей

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

134.86

10.45

40.29

115.24

10.79

9.52

3.69
84.12

34.82

3.12

70.64

 9.78

103.54

101.87

7.62

35.14

8.18

30.05

60.78

63.64

Динамика ввода систем 
коммутации телефонной 
связи на подстанциях ЕНЭС, шт.

Динамика ввода мощностей

120

80

40

0

113

18.50

88

83

11.84

17.83

2012 

2.81

2013 

2014

2.96

3.64

10.79

3.69

9.52

3.12

2010

2011

2012

2013

2014

Transformer capasity, thousand MVA

Transission lines, thousand km

B

Transformer capasity, thousand MVA

0

Value of purchases under 
procurement procedures, RUB 
billion 

Number of procedures 

2015
Share in the total value of 
purchases 
%

New Construction

2017

2018

2019

Other

Technical upgrade and reconstruction

2012

2013

2014

Transission lines, thousand km

2016

Development of Corporate Information-Based Management System

The development of corporate informa-
tion-based management system (CIMS) 
is regulated by Federal Grid’s IT strategy 
and implemented as part of a consolidat-
ed corporate plan for implementation of 
programmes of automated management 
of operations.

 A

A corporate information-based 
C
management system ensures 
comprehensive automation 
of the Company’s main 
business processes; improves 
manageability of Federal 
Grid via centralisation and 
systematisation of all available 
information and providing 
prompt access to it; and helps to 
reduce costs via more efficient 
spending of funds.

%

B

In 2014, with due regard of the Company’s 
development goals and objectives, the 
Management Board approved an adjusted 
plan for implementation of the corporate 
IT strategy until 2020. This plan includes 
the following automation programmes 
that are targeted at the further develop-
ment of CIMS: programmes for automated 
management of business processes and 
Новое строительство
investing activities aimed at the develop-
ment of UNEG and capital construction, 
automation of customer relations, man-
agement of assets, procurement, financial 
and business operations, substitution of 
imported electrical equipment, and HR 
management.

Прочее

B

A

C

Структура капитальных вложений за 2014 г., млрд руб.

Restricted tender 

Техническое перевооружение и реконструкция 24.28 / 27%

Open tender

Open request for quote 

Open request for proposals

Sole source 

Minor purchase 

Ordinary purchase 

Total

58.35 / 64%

8.23 / 9%

80.4%
Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.
0.7%

75.9

782

245

0.6

140

120

100

80

60

40

20

0

134.86

8.1

108.17

6.0

9.04
1.5

1.1
38.84

1.0

94.2

60.29

2015

2016

New Construction

10.45

40.29

84.12

2,084

115.24

828

 9.78
1

103.54

4,254

34.82

3,770

11,964

7.62

35.14

8.6%

6.4%

101.87

1.6%

1.2%

1.1%

100%

8.18

30.05

70.64

60.78

63.64

Open tendering 
2017
as share of total 
procurements of 
Federal Grid in 
Technical upgrade and reconstruction
2014  

80%

2018

2019

Other

32

33

PERFORMANCE RESULTS / OPERATING PERFORMANCEImport Substitution as a Strategic Priority

formation of competitive internal markets 
of such equipment. 

In order to encourage these processes 
and overcome dependence on imports, 
we drafted a Programme for Import 

Substitution of Equipment, Technologies, 
Materials and Systems, and approved 
it in 2014. The strategic priority of this 
Programme is to reduce the share of 
procured imported electrical equipment 
to 5% by 2030.

What results has Federal Grid 
Company achieved by using 
electronic procurement? 

“Since February 2008, more than 
95% of competitive procurements for 
Federal Grid have been made via the 
electronic marketplace. Using the 
e-marketplace allowed us to create 
a more transparent and competitive 
environment for suppliers of 
services, works, materials and 
equipment. 

Additionally, the functional 
capabilities of the e-marketplace 
helped us to increase the level of 
annual savings from procurement by 
4-5% of the level of savings within the 
period before the full-scale launch of 
e-commerce in procurement.”

Pavel Barkalov
Procurement Director – Head of  
Procurement and Master  
Scheduling Department of Federal  
Grid Company

Cooperation with Small and Medium-Sized Enterprises (SMEs)

Subject to the Decree of the Russian 
Government No. 867-r dated 29 May 2013 
“On Approving an Action Plan (“Roadm-
ap”) on Improving the Access of Small and 
Medium-Sized Enterprises to Procure-
ments of Infrastructure Monopolies and 
State-Owned Companies”, our Company 
approved a Partnership Programme 

between Federal Grid Company and small 
and medium-sized enterprises and start-
ed to maintain a register of SMEs who 
have joined the Programme.

We also established an Advisory Body on 
the issues of ensuring efficiency of Fed-
eral Grid’s procurement, which includes, 

among others, small and medium-sized 
business entities.  

In compliance with the Government Res-
olution No. 1352 dated 11 December 2014, 
we are going to approve a list of goods, 
works and services to be purchased from 
SMEs only.

Procurement Model   

Procurement Model

The national economy’s ability to supply 
electric power industry with domestically 
manufactured assets that are required 
for its reliable operations is a factor of 
the country’s energy security and sus-
tainability to external economic threats. 
This is why the reduction of reliance on 
imported equipment is an important 
development area of the Russian electric 
power industry.

Federal Grid Company now depends on 
imported equipment and components for 
330 kV and above (in the first place, cross 
connect equipment). Besides, the share 
of imported components that are used in 
the Russian-made equipment is at least 
30-40%. Given the need to lower the risks 
caused by reliance on imported equip-
ment, Federal Grid Company decided 
that import substitution is a strategic 
priority of its long-term development 
programme.

Our Company, as one of the largest 
Russian customers of high and extra-high 
voltage electrical equipment, is inter-
ested in the development of the Russian 
electrical engineering industry and in the 

 Suppliers of goods,
works and services

Can we say that Federal 
Grid’s experience of import 
substitution is the best practice 
in the Russian economy?

7. Entering into a Contract 
with a winner 

Information portals

Web-site of Federal Grid  
www.fsk-ees.ru
(electronic/
non-electronic 
procurement)

2. Publication 
of Procurement
Notice

Web-site
www.zakupki.gov.ru
(electronic
/non-electronic  
procurement)

E-portal for
submitting bids 

Electronic  
trading platform 
(e-procurement 
only)

In electronic form

Procurement Procedures

Mandate to conduct Procurement (1)
Publication of Procurement Notice 
and procurement documentation (2)
submission and receipt of Bids (3)
Evaluation of Bids and  conducting negotiations (4), (5)
Auction procedure for lowering prices (Rebidding)
Contract Award (6)
Conducting pre-contract negotiations if necessary 
and  entering into a Contract (7) 
Notice of the results of Procurement

3. Submission of  Bids 

Agency agreement that covers legal and other arrangements 
related to tenders and other procurement procedures 
(in case an outside organisation is involved as a procurement authority) 

1. Mandate to conduct Procurement
(in case an outside organisation is involved)

4. Sending copies of Bids

5. Expert opinions 

6. Contract award decision  

“Our Company has been systemically 
implementing the policy of 
substituting imported items with 
Russian-made electrical equipment 
since 2010. Over this period, 
we designed a mechanism for 
entering into long-term contracts 
with producers that have their 
manufacturing assets in Russia. This 
mechanism is used in contracts for 
supply of high-technology electrical 
equipment for Federal Grid’s needs. 

Valery Goncharov
First Deputy Chairman of  
the Management Board 
Member of the Management 
Board of Federal Grid 
Company

Contracts are signed with the leading 
international companies, such as 
Toshiba, Hyundai Heavy Industries, 
and Siemens.

Besides, Federal Grid is now the only 
government-owned company with 
an approved and publicly available 
import substitution programme. In 
accordance with this programme our 
ambitious goal is to reduce the share 
of imported electrical equipment in 
our procurements to 5% by 2030.

We extensively share our experience 
in this area. In particular, Federal 
Grid officers contribute to law-
making on import substitution as 
they sit on expert panels at the 
Ministry of Industry and Trade, 
Ministry of Energy, Ministry of 
Economic Development and 
State Duma.”

Procurement Authority 
 - Federal Grid Corporate Headquarters
- Federal Grid branches (MES, PMES) 
- JSC Energotechcomplekt 

Procurement Requester 
- Federal Grid Corporate Headquarters
- Federal Grid branches (MES, PMES)

1 The Programme is approved by Federal Grid’s Board of Directors (Minutes No. 224 dated 15 August 2014)

34

35

PERFORMANCE RESULTS / OPERATING PERFORMANCE  
Share of Russian-Made Electrical Equipment 
in the Total Procurements 
in 2013-2014, change

17%

2013

Russian-made 
equipment

Imported 
equipment

44.5%

2014

Federal Grid’s  
strategic goal in 
import substitution 
is to reduce the share 
of procured imported 
electrical equipment 
by 2030 to 5%

5%

by 2030

Targeted Share of Russian-
Made Electrical Equipment 
in the Total Procurements, 
by 2019, by Types of 
Equipment

Russian-made 
equipment

Imported 
equipment

81%

77%

Disconnectors 
110-750 kV

Shunt reactors 
110-750 kV

70%

Power 
transformers,
autotransformers 
110-750 kV

64%

Controlled shunt 
reactors
110-500 kV

57%

Current 
transformers 
110-500 kV

51%

Switches 
110-750 kV

41%

Voltage transformers 
110-500 kV

39%

Power cable insulated by 
cross-linked polyethylene 
110-330 kV

Gas insulated 
switchgears  
110-500 kV

30%

In 2011-2014, Federal Grid Company achieved the following results during implementation of its import substitution policy:

•  It entered into 97 cooperative agreements 

with electric engineering companies, 
including 74 agreements with the Russian 
companies.

•  It signed long-term supply contracts with 
several leading foreign manufacturers. 
These contracts include deep localisation 
of production in the Russian Federation, 
purchase of Russian-made components, 

establishment of joint ventures with the 
Russian manufacturers, and transfer of 
technologies to them.

•  The Company proactively cooperates 

with the authorities, nongovernmental 
organisations and other stakeholders in 
order to develop rules and regulations on 
import substitution. 

•  Federal Grid Company developed, 
approved and is proactively using a 
special-focus methodology for assess-
ment of localisation of electrical products 
manufacturing. Besides, the Company 
is drafting criteria that will help to treat 
enterprises located in the Russian Feder-
ation as domestic producers.

Russian-made electrical equipment in operation 

An extra-high voltage single-
phase transformer (transformer 
capacity: 417; voltage: 750 kV) has 
been successfully operating at 
one of Federal Grid’s substations – 

750 kV Gribovo. This transformer, 
the first one of this class in 
Russia, is an innovative product 
of JSC Electrozavod. It has 
better characteristics than those 

required by the current standards: 
electricity losses are 10% less, 
while transportation mass and 
fully loaded mass are reduced by 
15% и 12%, respectively.

Long-Term Contracts between Federal Grid and Electric Manufacturers for Supply of 
Electrical Equipment with Localisation of Manufacturing in the Russian Federation

Hyundai Electrosystems LLC
A plant which produces 110-500 kV gas insulated 
switchgear cubicles is a subsidiary of Hyundai Heavy 
Industries (South Korea) in Primorie region 

56.7%

Manufacturing 
localisation level 
targeted by 2017

Power Machines – Toshiba. High-Voltage Transformers
A plant which produces 110-750 kV transformers in St. 
Petersburg is a joint venture of JSC Power Machines and 
Toshiba (Japan)

55.0%

Manufacturing 
localisation level 
targeted by 2018

Siemens - Transformers
A subsidiary of international corporation Siemens in 
Voronezh sells power transformers and autotransformers 
of up to 250 MVA and up to  220 kV

77.5%

Manufacturing 
localisation level 
in 2014

3636
36

37
37

PERFORMANCE RESULTS / OPERATING PERFORMANCEENERGY SAVING AND ENERGY EFFICIENCY

Contribution to Improving Energy Efficiency 
of the Economy

We recognise Federal Grid’s substantive 
role in improving energy efficiency of the 
national economy and, therefore, we treat 
implementation of energy saving and 
energy efficiency initiatives as a priority 
of our operations.

In the reporting year, our Company com-
pleted the implementation of its Energy 
Saving and Energy Efficiency Programme 
for 2010-2014 that had been adopted in 
accordance with the Russian laws. A 
similar programme was developed and 
approved for 2015-2019.1

Objectives of the 
Energy Saving and 
Energy Efficiency 
Programme

• To ensure saving and ration-
al use of the fuel and energy 
resources and reduce con-
sumption of electric power 
for corporate needs during 
electricity transmission via 
UNEG grids by improving 
energy efficiency of the 
Company’s facilities and 
equipment

• To put in place a system 
of electric power man-
agement and certification 
of operations based on 
requirements of ISO 
50001:2011 “Energy man-
agement systems – Re-
quirements with guidance 
for use”

• To improve energy effi-

ciency of the Company’s 
electrical grid facilities 
and equipment 

Economic effect of 
measures that were 
implemented as part 
of the Energy Saving 
Programme in 2014  
amounted to 

RUB

113.6

Mln

In 2014, initiatives targeted at better 
energy saving and energy efficiency were 
implemented in the following key areas:

•  Reducing the process energy consump-
tion during electricity transmission 
through UNEG 

•  Fitting the buildings, structures, and 

installations that are owned by Federal 
Grid with metering devices for water, 
natural gas, thermal energy, and elec-
trical energy 

•  Reducing the electrical and thermal 
energy consumption in buildings, 
structures, and installations owned by 
Federal Grid

•  Reducing the consumption of fuel and 
lubricants used by Federal Grid to 
provide the electricity transmission 
services through UNEG 

•  Developing and improving Federal 
Grid’s regulations and internal doc-
uments related to energy saving and 
higher energy efficiency 

Federal Grid’s energy management system consistent with the international standard  
ISO 50001:2011

In 2014, the corporate system of energy management of Federal Grid Company, its Corporate Headquarters 
and two branches (MES Volga and Samarskoe PMES) was certified for consistency with the international 
standard ISO 50001:2011.

Strengths of the Company’s 
energy management system:

• A detailed and manageable 
Energy Saving Programme 

tion of targeted initiatives 
included in the Energy 
Saving Programme 

• High responsibility and 

• A well-designed system for 
monitoring of implementa-

competence of employees 
involved in the development 

and implementation of the 
energy management system 

• Promotion of information 

about advantages and meth-
ods of energy saving in the 
Company’s offices 

1 The Programme was approved by the Management Board of JSC FGC UES (Minutes No. 1239/3 dated 06 June 2014)

Our Company focuses on employee in-service training in energy saving and believes that such training plays an important role. For 
example, in 2014 the Company arranged training in MES East Training Centre for the following categories of MES East employees in 
order to prepare and ensure an appropriate level of competence:

•  Operating employees of substations and 
administrative and managerial employ-
ees (11 groups, 13-15 persons each); 
topic: “Classification of electric grids by 
purpose. Management of electric grid 
operating modes. Energy saving, ener-
gy efficiency and energy management”

•  Specialists of MES East and PMES who 
are responsible for implementation 
of the Energy Saving Programme and 
energy management. Topic: “Energy 
saving technologies and energy man-
agement in the power industry”

•  Specialists of MES East and PMES: 

training was arranged as part of the 
“Day of Knowledge”; topic: “Energy 
saving, energy efficiency and energy 
management.”

Use of Energy Resources in Federal Grid Company, 2014

Volume

Planned process 
impact of initiatives 
aimed at reducing the 
consumption  
of energy/fuel 

Actual process impact 
of initiatives aimed 
at reducing the 
consumption  
of energy/fuel 

Economic impact of measures 
taken to reduce the consumption of 
energy/fuel

Process electricity consumption in 
UNEG, o/w:

Electricity consumption for substations’ 
own needs 

Electricity consumption in buildings

21,261.1 
mln kWh

968.7
mln kWh

32.6 
mln kWh

90.1
mln kWh

5.3 млн
кВт*ч

0.95
mln kWh

96.1
mln kWh

107,100.9
RUB thousand, excluding VAT

5.6
mln kWh

5,849.3
RUB thousand, excluding VAT

0.9 
mln kWh

3,027.9
RUB thousand, excluding VAT

Thermal energy consumption in 
buildings

44.39
thousand Gcal

1.36
thousand Gcal

1.88
thousand Gcal

1,800.5
RUB thousand, excluding VAT

Gasoline consumption 

Diesel consumption 

8,232.3 
thousand liters

31.32
thousand liters

32.92
thousand liters

997.7
RUB thousand, excluding VAT

6,960.8 
thousand liters

19.09
thousand liters

23.48
thousand liters

733.0
RUB thousand, excluding VAT

The Company achieved these results 
through energy saving initiatives.

Federal Grid is taking the following 
actions in order to reduce technological 
consumption (losses) of electricity in 
UNEG:

•  Improving heat insulation of building 

walls 

•  Replacement of wooden windows with 

•  The key measures aimed at the reduc-
tion of consumption of fuel and lubri-
cants:

•  Optimisation of the circuit and mode 

parameters in operation and control of 
the electric grids

•  Reduction of electricity consumption for 

the own needs of the substations 

•  Building, reconstruction, and develop-
ment of electric grids, as well as com-
missioning of energy saving equipment 

In 2014, the companywide process effect 
of measures aimed at the reduction of 
electricity losses was a saving of 96.112 
million kWh, which is equivalent to 
11,821.8 tonnes of fuel equivalent; the 
economic effect amounted to RUR107.1 
million.

energy efficient equivalents 

•  Daily checks of tire pressure in vehicles 

•  Replacement of incandescent light 
bulbs in buildings with energy sav-
ing equivalents (including LED strip 
lamps))

•  Adjustment of fuel consumption norms

•  Thorough monitoring of vehicle use

•  Purchase of a diagnostic tools for vehi-

•  Installation of lighting control systems 

cle injection engines

(installation of motion sensors)

•  Replacement of old doors (mostly 

wooden ones) with new energy efficient 
ones

•  Modernisation of ventilation and air 

conditioning systems

•  Installation of reflecting screens behind 

heating devices 

•  Optimisation of travel routes using 

satellite navigation for continuous mon-
itoring (GLONASS 

•  Optimisation of travel routes, staff 

training, and priority for loads with the 
lowest unit fuel consumption.

In 2014, the companywide effect of meas-
ures aimed at the reduction of consump-
tion of resources for Federal Grid’s own 
needs amounted to 447.7 tonnes of fuel 
equivalent (861.56 thousand kWh, 1,880 
Gcal, 56,400 litres of fuel and lubricants) 
to the total amount of RUR6.559 million.

The key measures aimed at the reduction 
of electric and thermal energy consump-
tion in buildings, structures and installa-
tions:

•  Appointment of responsible parties 

•  Optimisation of the heating g systems 

operations 

38

39

PERFORMANCE RESULTS / OPERATING PERFORMANCEFederal Grid pilot projects on energy saving and energy efficiency

INVESTMENTS AND INNOVATIVE DE VELOPMENT

47%

60%

Динамика уровня цифровизации 

электросетевых объектов ФСК

80%

63%

69%

Общая протяженность ВОЛС ФСК, 
тыс. км

Динамика ввода систем 

высокочастотной связи 

на подстанциях ЕНЭС, шт.

Динамика ввода систем 

коммутации телефонной 

связи на подстанциях ЕНЭС, шт.

60%

40%

20%

0%

54.0%

48.9%

40.3%

574

436

367

88

83

113

2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

2014

800

600

400

200

0

120

80

40

0

40%
INVESTING ACTIVITIES
20%

Investments in the Development of 
Electric Grid Infrastructure 

2012 

2013 

2014

0%

Динамика объема финансирования инвестиций, 
млрд руб.

Heat recovery

Pilot project of AT 1 heat recovery (Phase A) at 500/220/10 kV Nizhegorodskaya 
substation  (MES Volga) for heating the substation control desk: the Company used 
a heat pump that made it possible to increase the saving of thermal resources for 
heating and reduce the consumption of electricity for heating of buildings and air 
cooling of transformers.

Динамика уровня цифровизации 
электросетевых объектов ФСК

Optimising operation of the transformer cooling systems

63%

69%

60%

Cooling control boxes AT-1 with frequency regulation were replaced at 500/220/10 
47%
kV Nizhegorodskaya substation (MES Volga). The replacement helped to increase 
the service life of the autotransformer, increase the efficiency of using the cooling 
system, and register, store and automatically transmit information about the cooling 
system parameters in the automatic management system.

40%

80%

20%

0%

80

60%

60
•  Calculated energy saving:  
40.3%

48.9%

40%

16,000 kWh / year

40

20

20%

0%

36

Using plasma lamps for lighting of the open switchgear 

2013 

2012 

2014

0
2012 

2013 

2014

2012 

2013 

2014

Динамика объема финансирования инвестиций, 
Twenty-four external floodlights at 500/220/10 kV Nizhegorodskaya substation (MES 
•  Annual consumption of electricity 
млрд руб.
Volga) were replaced with plasma lights that have high quality of light flux, energy 
used for lighting was reduced by 
efficiency and long service life, and are environmentally friendly.
60,700 kWh / year

•  Expected energy saving:  

648,000 kWh / year

•  Expected cash effect of energy saving: 

RUB1,166.78 thousand

Динамика введения на подстанциях 
ЕНЭС систем сбора и передачи 
Общая протяженность ВОЛС ФСК, 
информации, шт.
тыс. км

The main objectives of Federal Grid Com-
pany’s investments are modernisation and 
Динамика ввода систем 
improving reliability of the unified energy 
Динамика введения на подстанциях 
system operations required to provide un-
высокочастотной связи 
interrupted power supply to the consum-
ЕНЭС автоматизированных систем 
на подстанциях ЕНЭС, шт.
управления технологическими процессами, шт.
Investments in the Development of Electric Grid Infrastructure

ers.  As part of its investment activities, 
the Company implements projects on the 
construction of new electric grid infra-
structure facilities and reconstruction of 
Динамика ввода систем 
the existing ones.
коммутации телефонной 
связи на подстанциях ЕНЭС, шт.

83

71

54.0%

800

600

400

574

200

436

150

Financing, RUB billion (including VAT) 

367
109

144

170
120

80

2014  
actual

Actual / 
target

113

88

83
90,857.03

78%

Investments Financing 
Trend in 2010-2014,  
RUB billion

184.7

179.9

167.0

149.7

Динамика ввода мощностей

90.9

18.50

17.83

11.84

2.81

2.96

3.64

10.79

3.69

9.52

3.12

2010

2011

2012

2013

2014

2010

2011

2012

2013

2014

Transformer capasity, thousand MVA

Transission lines, thousand km

200

40
Capital investment volume, RUB billion (including VAT)

135,161.14

109%

100

50

0

Conversion of construction in progress into fixed assets, RUB billion

0

2012 

0

2013 

2014

2012 

2012 
Deployment of industrial capacities (commissioning of power 
facilities), MVA

2013 

2014

155,091.13
2013 

2014

121%

9,522

112%

Deployment of industrial capacities (commissioning of power 
facilities), km

3,120.62

95%

* Справочно: фактический объем незавершенного строительства, переведенный в состав основных 
средств в физическом выражении (трансформаторная мощность и линии электропередачи), в 2014 г. 
составил 5 069 МВА и 3 331 км.

Динамика ввода мощностей

Capacity Commissioning Trend
18.50

17.83

C

%

 A
11.84

11.84

2.81
2.81

2010
2010

18.50

Структура капитальных вложений за 2014 г., млрд руб.

17.83

B
Техническое перевооружение и реконструкция 24.28 / 27%

9.52

10.79

Новое строительство

10.79

3.64
3.64

Прочее

3.69
3.69

9.52

3.12

3.12

58.35 / 64%

8.23 / 9%

A

B
2.96
2.96
C

2011
2011

2012
2012

2013
2013

2014
2014

Динамика введения на подстанциях 
ЕНЭС систем сбора и передачи 

информации, шт.

Динамика введения на подстанциях 
ЕНЭС автоматизированных систем 
управления технологическими процессами, шт.

Using “light tubes” for lighting of office buildings 

83

71

36

80

60

40

20

0

This technology for lighting of office buildings by outdoor sunlight was used when 
the administrative building of MES Volga in Samara was refurbished; 14 “light tubes” 
were installed on the roof of a six-floor building.
144

170

200

150

109

100
Introduction of an automated heating station

50

2012 

2013 

2014

0

2013 

2012 

Automated control of water consumption was put in place when the heating system in 
the administrative building of MES Volga in Samara was refurbished. This technology 
helps to reduce excess energy consumption for heating and hot water supply, extend 
the life service and reduce the time between repairs of heat networks and boiler room 
equipment, keep record of heat consumption and make surplus heat for periods of 
the lowest temperatures. 

2014

Improving energy efficiency of the lighting installations

184.7

179.9

167.0

•  Calculated energy saving:  

149.7

2,999.5 kWh / year 

90.9

•  Thermal energy saving: 230 Gcal 
2010
2014
2012
•  Expected cash effect of thermal 

2013

2011

energy saving: RUB437.04 thousand  

B

Transformer capasity, thousand MVA

Transission lines, thousand km

into fixed assets, 93% for commissioning  
of transformer capacities (as adjusted) 
Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.
and 95% for commissioning of transmis-
sion lines. 

Overall, Federal Grid has met the 2014 in-
vestment programme targets. In particu-
lar, its performance was 78% for financ-
ing, 109% for investment volume, 121% 
for conversion of construction in progress 

134.86

 A

C

%

B

Work was completed on raising energy efficiency of lighting installations in the 
administrative building of the Upper Don PMES: the existing lamps and lighting 
fixtures were replaced with energy efficient LED light bulbs and automated 
management of internal lighting in the building was installed.

Структура капитальных вложений за 2014 г., млрд руб.

•  Electricity saving: at least  

140

19,300 kWh / year 

120

•  Operational costs reduced by at least 

RUB430,500/year

100

108.17

A

B

C

Техническое перевооружение и реконструкция 24.28 / 27%

Новое строительство

Прочее

58.35 / 64%

8.23 / 9%

80

60

40

20

0

9.04

38.84

60.29

10.45

40.29

115.24

 9.78

103.54

101.87

34.82

7.62

35.14

8.18

30.05

84.12

70.64

60.78

63.64

40

2015

2016

2017

2018

New Construction

Technical upgrade and reconstruction

2019

Other

41

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

C

%

140

120

100

80

60

40

20

0

A

108.17

9.04

38.84

60.29

134.86

10.45

40.29

115.24

 9.78

103.54

101.87

34.82

7.62

35.14

8.18

30.05

84.12

70.64

60.78

63.64

2015

2016

2017

2018

New Construction

Technical upgrade and reconstruction

2019

Other

Structure of Capital
Investments in 2014,
RUB billion

A

B

C

New construction

Technical upgrade and 
reconstruction

/
58.35   64%

/
24.28   27%

Other

8.23 / 9%

PERFORMANCE RESULTS / OPERATING PERFORMANCESignificant Investment Projects 
Implemented in 2014

New construction

Reconstruction

8

19
3

15

4

67

20

11

16

21

1

17

2

14
5

12

13
9

18

10

We commissioned  341.8 km of the 500 kV 
Rostov NPP – Tikhoretsk OHL, which is 
strategically important for the develop-
ment of the South Federal District

We reconstructed 220 kV Koysug SS (to 
250 MVA), which will subsequently enable  
to provide reliable power supply to a num-
ber of large industrial consumer in Rostov 
oblast, such as JSC Rostovskiy Port

Our Company put into operation the second 
circuit of high voltage line between Uren-
goy HPP and oil fields of the Autonomous 
District with the total length of 426.7 km

18. We carried out reconstruction of 

electric grid complex 220/110/10 kV 
Svetlaya SS. The reconstruction will 
significantly improve reliability of 
power supply of consumers in the 
city Kamen-na-Obi, eight districts in 
the North of the region and part of 
the TransSiberian Railway. 

19. As part of the agreement with the 
Government of St Petersburg, our 
Company reconstructed 220 kV 
Poluprovodniki SS (160 MVA); the 
goal of the project was to provide 
reliable electricity supply and create 
conditions for connecting the city’s 
consumers to electric grids. 

20. We reconstructed 220 kV Koysug SS 

(to 250 MVA), which will subse-
quently enable to provide reliable 
power supply to a number of large 
industrial consumer in Rostov 
oblast, such as JSC Rostovskiy Port, 
Azov-Don shipping, Rostov Section 
of the North-Caucasus Railway and 
many others. 

21. The Company reconstructed 220 kV 
Shepsi – Dagomys OHL with the 
length of 61.59 km. Commissioning 
this line will allow to provide higher 
reliability of electricity supply to 
the Republic of Abkhazia, strate-
gic facilities in the Tuapse district, 
consumers of the Greater Sochi, 
including sports facilities in the hill 
and beach clusters. 

1.  We commissioned 341.8 km of the 500 kV 
Rostov NPP – Tikhoretsk OHL, which is 
strategically important for the development 
of the South Federal District – it will deliver 
capacity from the new Rostov NPP facility 
(1,100 MW) to the region.

2.  252.8 km of Pechorskaya HPP – Ukhta-Mi-
kun high voltage line was commissioned. 
This line is supposed to ensure more 
reliable electricity supply to consumer of 
Sourthern district of the Komi Energy Sys-
tem and to increase transit capacity.

3.  We commissioned 250 MVA transformer ca-
pacities for the 330 kV Gatchniskaya – Luzh-
skaya OHL with 330 kV Luzhskaya SS. These 
capacities will help improve reliability of 
power supply to consumers of the Luzhsky 
district in Leningradskaya oblast.

4.  The Company commissioned 94.7 km of 
transmission lines relating to the 330 kV 
Leningradskaya NPP-2 OHL – Gatchinskaya 
SS. The implementation of the whole project 
will ensure delivery of the capacity of the 1st 
Poser Facility of the Leningradskaya NPP-2, 
thereby significantly increasing the possi-
bilities for, and increasing the reliability of 
power supply for Leningradskaya oblast.

5.  Our Company commissioned 74.7 km 

of transmission lines under the project 
“Reconstruction of 220 (500) kV Tarko- 
Sale – Urengoy OHL. This line will support 
delivery of capacity of Urengoy HPP Power 
Facility No 1. This project is part of another, 
large-scale project to supply electricity to 
the Vankor oil and gas field.

6.  We commissioned 18.1 km of transmission 
lines under the project “220 kV Approaches 
of Transmission Lines to Vladimir Combined 
Heat and Power Plant-2. Technological 
connections of electric plant of JSC TGK-6”. 
Implementation of this project will ensure 
distribution of the capacity of Vladimir Com-
bined Heat and Power Plant-2.

7.  We put into operation main substations de-
signed to provide electricity for consumers 
of the Skolkovo Innovation Centre (Moscow).

8.  8. As part of the effort to create a system 

of reliable electricity supply to the Valaam 
archipelago, we commissioned a 13.5 km 
cable line supplying power to the island

9.  Under the project aimed to provide external 
energy supply to support the expansion 
work at the East Siberia – Pacific-1 pipeline 
(to increase the throughput of the pipeline 
to 50 million tons per year) we commis-
sioned 150 MVA of transformer capacity and 
483.4 km of transmission lines.

10. As part of implementation of the Federal 

Targeted Programme “Economic and Social 
Development of the Far East and Trans-
baikal for the Period to the year 2013”, we 
commissioned 132.75 km of transmission 
lines under the project “Construction of 
Dual-Circuit 220 kV Tautarovo – Goryachin-

skaya – Barguzin OHL with 220 kV 
Goryachinskaya SS, 220 kV Barguzin SS and 
reconstruction of 220 kV open switchgear at 
the 220 kV Tataurovo SS”. When the project 
is fully implemented, it will provide electric 
power supply to the Baikal Haven Special 
Economic Zone.

11. The Company commissioned 801 MVA of 

capacity under the project “Reconstruction 
of 500/220/35 kV Kyibyshevskaya SS”. Upon 
the completion of the reconstruction, this 
substation will be a power facility of a new 
generation equipped with modern automat-
ed systems and high-technology machinery 
that can provide electricity to most of the 
consumers of the Samara and Samara 
oblast.

12. As part of the programme to contain 
the fallout from the accident at the 
Sayano-Shushenskaya HPP, the Compa-
ny commissioned a 500 kV line between 
substations Aluminiyevaya and Itatskaya 
(269 km of length), which serves, amongst 
other things, to increase the transfer capac-
ity between Krasnoyarsk and the Republic 
of Khakassia.

13. We commissioned 1,068 MVA of transformer 
capacities and 7.3 km of approach lines at 
the Yenisey substation in order to ensure re-
liability of power transfer between Irkutsk 
and Krasnoyarsk.

14. As part of the comprehensive develop-

ment programme for the Yamalo- Nenets 
Autonomous District and the North of the 
Krasnoyarsk Krai, our Company put into 
operation the second circuit of high voltage 
linebetween Urengoy HPP and oil fields 
of the Autonomous District with the total 
length of 426.7 km. 

15. We commissioned 440 MVA of transformer 
capacities at the Pulkovskaya substation. 
This substation shall be used to ensure 
reliable power supply for newly connect-
ed consumers at the new terminal of the 
Pulkovo airport, for facilities supplying 
electricity to the International Congress and 
Exhibition Centre ExpoCentre and to serve 
as a hub to which new 110 kV substations 
can be connected. 

16. The Company commissioned the 

500 kV Krasnoarmeyskaya – Gazovaya OHL 
(401.5 km), enabling to increase the grid 
transfer capacity of the connection Middle 
Volga – Urals by 500 MW in the direction 
of the IPS Ural and by over 400 MW in the 
direction ofthe IPS Middle Volga. 

17. Construction was completed of approach 

lines for the 500 kV Yuzhnaya – Shagol OHL 
(173.8 km) to deliver capacity of the Belo-
yarskaya NPP-2 (4th Power Facility using a 
fast-neutron reactor BN-800). 

42

43

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENT2012 

2013 

2014

2012 

2013 

2014

2012 

2013 

The main goals of the long-term Federal Grid’s investment 
programme are:

Динамика объема финансирования инвестиций, 
млрд руб.

Federal Grid’s Investment Programme for 
2015-20191 was developed based on the 
assumption that prices for services pro-
vided by natural monopolies in 2014 would 
remain at the previous year’s level, and 
changes in limits of investment projects’ 
financing due to lower revenue generat-
ed by providing electricity transmission 
services.

2014

Federal Grid’s Investment Programme 
envisages the construction and recon-
struction of power infrastructure of pro-
jects bearing national importance, such 

as international forums and important 
sports competitions, oil transportation 
projects and programmes of development 
of Russia’s various regions. We under-

stand the importance of such projects 
and do everything we can to build and 
reconstruct grid facilities on time and to 
the highest standards.

Development of the electric grids in the Far East and Transbaikal

Динамика уровня цифровизации 

электросетевых объектов ФСК

Общая протяженность ВОЛС ФСК, 

тыс. км

60%

40%

54.0%

48.9%

40.3%

Динамика ввода систем 

высокочастотной связи 

на подстанциях ЕНЭС, шт.

800

600

400

574

436

367

Long-Term Investment Programme

20%

200

0%

0

Динамика ввода систем 

коммутации телефонной 

связи на подстанциях ЕНЭС, шт.

120

80

40

0

88

83

113

Key Investment Projects

Динамика введения на подстанциях 

Динамика введения на подстанциях 

ЕНЭС систем сбора и передачи 

ЕНЭС автоматизированных систем 

информации, шт.

управления технологическими процессами, шт.

83

71

36

80

60

40

20

0

170

144

109

200

150

100

50

0

2012 

2013 

2014

2012 

2013 

2014

80%

60%

40%

20%

0%

63%

69%

47%

2012 

2013 

2014

 A

C

%

B

• Modernisation and reliability 
improvement of the Unified 
Energy System

• Providing electricity supply 
to the facilities of national 
importance, including 
developing reliable electricity 
supply to the South Federal 
District

• Ensuring failure-free electric 
power supply in the situation 
of separate functioning of 
11.84
the Unified Energy System of 
Russia and power grids of the 
Baltic States (Estonia, Latvia, 
2.81
Lithuania)

• Ensuring failure-free electric 
power supply in the situation 
of separate functioning of 
the Unified Energy System 

2010

of Russia and the Integrated 
Power System of Ukraine
• Removing grid restrictions, 
ensuring the quality and 
accessibility of services for 
electricity transmission and 
technological connection for 
the consumers

Динамика ввода мощностей

• Synchronisation of the 

development programmes with 
18.50
the generating facilities and 
distribution grids

17.83

• Improving the efficiency 
of the backbone electric 
grids by reducing the costs 
3.64
and implementing energy 
efficiency programmes
• Establishing an effective 

2012

2011

2.96

10.79

3.69

9.52

3.12

2013

2014

Transformer capasity, thousand MVA

Transission lines, thousand km

system for the management of 
UNEG operations

184.7

179.9

167.0

The total level of investments planned 
for the 2015-2019 period is RUB563.7 
billion, which will be used to introduce 
149.7
55,500 MVA of capacity and 12,400 km of 
transmission lines into the fixed assets of 
Federal Grid.

90.9

The investment programme for 2015-2019 
is supposed to be financed using Federal 
Grid’s own funds, bond issues2 and funds 
from the Federal Budget. The programme 
provides for an even distribution of the 
investment costs over the 5-year period, 
2013
which will enable the Company to main-
tain a balanced structure of its financing 
sources.

2011

2012

2010

2014

The investment programme for 2015-2019 
has been optimised in the view of two 
requirements: completing grid projects 
construction started in previous periods 
and possibilities of financing new invest-
ment projects in the current economic 
environment.

140

Структура капитальных вложений ФСК в 2015-2019 гг., млрд руб.

Structure of Federal Grid’s capital investments in 2015-2019, 
RUB billion 

134.86

Структура капитальных вложений за 2014 г., млрд руб.

A

B

C

Новое строительство

Прочее

Техническое перевооружение и реконструкция 24.28 / 27%

58.35 / 64%

8.23 / 9%

108.17

9.04

38.84

60.29

120

100

80

60

40

20

0

10.45

40.29

115.24

 9.78

103.54

101.87

34.82

7.62

35.14

8.18

30.05

84.12

70.64

60.78

63.64

Buryatia 

Yakutia

In the Pribaykalsky District of the Republic of Buryatia we have 
been continuing the construction of the dual-circuit 220 kV OVL 
connecting the Goryachinsk substation and the Tataurovo sub-
station, which is currently being reconstructed.

These substations will supply power to the facilities under con-
struction in the Baikal Harbor special economic zone, such as 
the Centre for Eastern Medicine, port and sports and recreation 
and hotel complexes.  Additionally, there will be a significant 
increase in the reliability of the electricity supply to the Barguz-
insky, Kurumkansky, and Pribaykalsky Districts of the Republic 
with a population of 72 thousand people, as well as the East-Si-
berian Railway and the Pribaykalsky National Park.

The total cost of construction under the project will be RUB7.6 
billion.  In 2010-2014 the construction was financed with Federal 
Grid’s own investment funds as well as those from the Federal 
Budget.

We plan to commission the first start-up facility in 2015; the 
deadline for the completion of the whole project has been post-
poned to 2022.

We have been continuing the construction of a 220 kV Neryun-
grinskaya HPP – Nizhny Kuranakh – Tommot-Maya OHL and 2 
substations: 220 kV Tommot and 220 kV Maya.  Implementation 
of the project will enable to connect the isolated central energy 
district of Yakutia with the to the IPS East electric grid Unified 
East Power System and to abandon the costly independent 
power supply sources. In addition, conditions will be created for 
connecting new consumers and economic development of South 
Yakutia.

In 2011 – 2014, 711.77 km of transmission lines and compen-
sating installations (200 MVAr) were commissioned. We plan to 
commission 440 MVA of transformer capacity during the subse-
quent periods.

The total cost of the construction is RUB19.3 billion. The project 
is scheduled to be completed in 2016.

In order to ensure parallel operation of IPS Siberia and IPS East, 
we plan to carry out the project Amur Transformer Complex at 
Khani substation, which has design capacity of 200 MW and is 
scheduled to be completed in 2019.

Programme to contain the fallout from the accident at the Sayano-Shushenskaya HPP

In 2014, equipment at substations No-
vokuznetskaya and Oznachennoye was 
technically upgraded, the Company also 
carried out works at its facilities in the 
Krasnoyarsk Krai relating to the recon-
struction of an outdoor switchgear at the 
Sayano-Shushenskaya HPP.

R&D programme

A

A

R&D programme

B

B

Integrated pilot projects to create an 
active-adaptive grid with the use of innovative 
technologies and energy efficiency

Integrated pilot projects to create an 
active-adaptive grid with the use of innovative 
technologies and energy efficiency
Creation of training centres for Federal 
Grid’s operating staff

In 2014, we completed the construction of 
500 kV Aluminiyevaya – Abakan – Itat-
skaya No 2 OHL with the total length of 
270 km, which will be used to deliver the 
blocked capacity of the Sayano-Shushen-
skaya HPP and shall improve reliability of 
power supply to Sayansky and the Khassy 
Aluminium Plants.

Creation of training centres for Federal 
Grid’s operating staff

C

C

Voskhod and overhead lines with the total 
length of 41 km shall be constructed. 
These facilities are scheduled to be com-
missioned in 2016.

419.4

In total, under the Programme to con-
tain the fallout from the accident at the 
Sayano-Shushenskaya HPP, Federal Grid 
commissioned 501 MVA of transformer 
capacity and 632 km of transmission lines.

/
419.4
/
2,598.8

14%
/
84%
/

2,598.8

14%

84%

76.6

2%
/

/
76.6

Steps taken to ensure power transit via 
the Kurgan – Ishim – Voskhod connection 
enabled to increase reliability of electricity 
supply to consumers of the Omsk Energy 
System and consumers in the south of 
Tyumen oblast, due to these measures the 
maximum level of flow of capacity was in-
creased between IPS Siberia and IPS Ural.

2%

C

C

%
%

A

A

B

B

2015

2016

2017

2018

New Construction

Technical upgrade and reconstruction

Federal Grid capital investments for 2015-2019, by project, RUB billion

A

B

C

D

E

F

G

H

I

A

B

C

D

E

F

G

H

I

BAM and Transsib

BAM and Transsib

BRELL

BRELL

Development of Backbone grids

Development of Backbone grids

Renovation

Renovation

Ensuring capacity delivery

Ensuring capacity delivery

Technological connection

Technological connection

Programmes of national significance

Programmes of national significance

Other

Other

Power suply to Southern Federal District

Power suply to Southern Federal District

101.7

108.1

122.2

32.1

/
101.7
33.8
/
33.8
/
32.1
/
108.1
48.6
/
48.6
/
122.2
23.9
/
23.9
/
48.3
/
45.0

45.0

48.3

H

H

G

G

F

F

18%
/

6%

 6%

18%
6%
/
 6%
/
19%
/

19%
9%
/
22%
/

9%

4%

22%
4%
/
8%
/
8%
/

8%

8%

I

I

%
%
%

E

E

2019

Other

A

A

B

C

B

C

D

D

1 Approved by the Order of the Russian Ministry of Energy No. 807 dated 31 October 2014
2 Subject to market conditions

Under Federal Grid’s investment pro-
gramme, in 2015 – 2019 a new substation 

44

45

Динамика объема финансирования НИОКР, млн руб.

Динамика объема финансирования НИОКР, млн руб.

Выручка, млн руб.

Выручка, млн руб.

3,0

3,0

2,0

2,0

1,0

1,0

0,0

0,0

2.9

2.9

1.9

1.9

1.0

1.0

1.7

1.7

0.4

0.4

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

138,137

138,836

138,137

138,836

111,085

111,085

168,941

168,941

155,352

155,352

50

0

50

0

Чистая прибыль (убыток), млн руб.

Чистая прибыль (убыток), млн руб.

57,082

57,082

Полная себестоимость, млн руб.

Полная себестоимость, млн руб.

132,948

132,948

140,259

140,259

116,510

116,510

5,137

5,137

92,900

92,900

82,501

82,501

2010 

2010 

2011 

2012 

2013 

50

2014

2010 

2011 

2012 

2013 

50

2014

2010 

2011 

2012 

2013 

2014

2011 

2012

2013

2014

2010 

2012 

2013 

2014

2010 

2011 

2012

2013

2014

2011 

-2,468

-2,468

-24,532

-24,532

-25,898

-25,898

Динамика структуры активов, млн руб.

Динамика структуры активов, млн руб.

1 214 291

1 214 291

1 231 217

1 231 217

1 122 995

1 122 995

1 037 493

1 037 493

902 110

902 110

Размер стандартизированной 

Размер стандартизированной 

ставки С1 в 2013-2015 гг., 

ставки С1 в 2013-2015 гг., 

руб./кВт (без НДС)

руб./кВт (без НДС)

27,56

27,56

27,56

27,56

28,61

28,61

Диаграмма динамика долгового портфеля ОАО «Ф СК ЕЭС», млрд руб.

Диаграмма динамика долгового портфеля ОАО «Ф СК ЕЭС», млрд руб.

300

300

250

250

200

200

1050

1050

100

100

50

0

50

0

25,0

25,0

105,0

105,0

56,0

56,0

17,5

35,0

17,5

35,0

160,0

160,0

100,0

100,0

17,5

17,5

164,8

164,8

100,0

100,0

17,5

17,5

140,3

140,3

2010

2011

2010

Основные средства

2011

2012

2012

2013

2013

Незавершенное строительство

2014

2014

Авансы под внеоборотные

Основные средства

Незавершенное строительство

Долгосрочные

активы

активы

Авансы под внеоборотные

финансовые вложения

Долгосрочные

финансовые вложения

Оборотные

активы

Оборотные

активы

2013 

2014 

2015

2013 

2014 

2015

2010 

Облигации

2010 

Облигации

2011 

2011 

Кредиты

Кредиты

2012 

2012 

Еврооблигации

2013 

2013 

Инфраструктурные облигации

2014

2014

Еврооблигации

Инфраструктурные облигации

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENTCompensatory measures 
relating to separate 
functioning of the Unified 
Energy System of Russia and 
the Integrated Power System 
of Ukraine

In order to ensure reliable power sup-
ply of the North-West part of the Rostov 
power system, Federal Grid’s investment 
programme envisages installation of an 
autotransformer with the capacity of 125 
MVA at Pogorelovo substation and con-
struction of electricity transmission line 
between the cities of Shakhty and Donetsk 
(Rostov oblast) with the total length of 
80 km. The facilities are scheduled to be 
commissioned in 2016.

Development of electric grid infrastructure in the area of BAM and TransSib

This macroproject involves construction 
and reconstruction of UNEG electric grid 
infrastructure in the Siberian and Far 
East Federal Districts. The objective of 
the project is to ensure the additional load 
on railway networks and system relia-
bility of the backbone electric grid in the 
area of the Eastern Poligone, JSC Russian 
Railways.

Technical upgrade and reconstruction, 
as well as construction of new power 
facilities will increase the transformer 
capacity by 3,518 MVA and the length of 
electricity transmission lines by 3,691 km.

a comprehensive justification for 
the project and has also con-
ducted the pricing and 
technological audit 
in its respect.

The Russian Government confirmed 
the strategic importance of this 
project. By this time, 
Federal Grid has 
prepared 

м

м

Improving the 
accessibility of electric 
grid infrastructure of the 
Krasnodar Krai

One of the key objectives in the area of 
regional infrastructure is to enable techno-
logical connection of consumers from the 
city of Krasnodar, including a large-scale 
housing construction project. In order to 
meet this objective, we plan to build in 
Krasnodar East Industrial Zone substation. 
Commissioning of capacity of 560 MVA and 
16 km of overhead transmission lines is 
scheduled for 2017. The cost of this invest-
ment project is RUB2.4 billion.

In order to facilitate efficient interaction 
between the Administration of the Kras-
nodar Krai and Federal Grid on matters 
relating to the development, ensuring 
efficient operation and improved reliability 
of the UNEG grid complex in the Krasnodar 
Krai, we have recently signed a Co-oper-
ation Agreement for the period 2015-2020 
(No. 000000343113 dated 24 February 2015) 
in respect of the construction of the East 
Industrial Zone substation.

Ensuring reliable operation of the 
Unified Energy System of Russia 
separately from the energy systems of 
the Baltic States (macroproject BRELL)

This macroproject represents a set of measures 
designed to compensate the consequences of 
the lowered transfer capacity of electric connec-
tions in the unified energy systems of the Centre and 
North-West as parts of the UES of Russia and changes 
in operations of the energy ring of the BRELL countries 
(Belarus – Russia – Estonia – Latvia – Lithuania).

In this area, our investment programme includes reconstruc-
tion of the Talashkino substation, modernisation of the 
existing emergency control automatics at the substations 
Leningradskaya, Chudovo and Pskov, construction of 
overhead transmission lines Novosokolniki – Talashki-
no, Leningradskaya – Belozerskaya, Pskov – Luzh-
skaya and construction of 330 kV OHL approach 
lines to the Kingisepskaya substation.

Ensuring power delivery from generation facilities

Our long-term investment programme 
provides for the commissioning of facil-
ities with the total capacity of 125 MVA 
and construction of 521 km of electricity 
transmission lines. Currently we are 
working on the implementation of power 

delivery schemes for Novovoronezh-
skaya NPP-2, Leningradskaya NPP-2, 
Nizhnebureyskaya HPP, Zagorskaya 
PSPP, Zelenchukskaya HPP, Chelyab-
inskaya HPP, Huadian – Teninskaya CHP, 
Perm HPP.

Development of grid infrastructure co-financed by consumers

Currently, Federal Grid is implementing a 
project to build a 220 kV Razdolinskaya –  
Taiga OHL and 220 kV Taiga substation 
based on the principles of co-financing 
by the consumer, CJSC Polyus. Under the 
deal structure, the consumer is supposed 
to set up a special-purpose vehicle (SPV) 

to carry out construction and to raise 
funds. Federal Grid, in its turn, shall 
provide technical supervision over the 
implementation of the project and, upon 
the completion of the facilities, shall 
buy them out in installments over a long 
period of time.

Federal Grid is cur-
rently in negotiations with 
JSC Norilsk Nickel regarding 
the construction of electric grid 
infrastructure of Bystrinsky Mining and 
Processing Plant under similar conditions.

46

47

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENTBasic parameters of the key investment projects

Project

Development of electric grid infrastructure  
at BAM and Transsib

BRELL

Ensuring power delivery from generation facilities 

Development of the grid complex in Rostov oblast

Development of the grid complex in Krasnodar

Development of the grid complex in Buryatia

Project implementation 
timeframe 

start

completion

Commissioned 
in 2014 

Design capacity

Financing in 
2015-2019, 
RUB billion

2014

2015

2015

2015

2015

2010

2024

2019

2019

2016

2017

2022

0

250 MVA

806.5 km

0

0

3,518 MVA
3,691 km

2,071.5 MVA
approach lines
 1 km

125 MVA
521 km

125 MVA
80 km

560 MVA
16 km

132.75 km

1 st.-up – 2х125 MVA
2 st.-up – 2х132.3 km

Development of the grid complex in Sakha (Yakutia)

2009

2016

282 MVA

Measures to contain the fallout from the accident  
at the Sayano-Shushenskaya HPP 

2010

2016

269.6

1st stage – 275 km
 2nd stage –
2х63 MVA
2х125 MVA
2х16 MVA
2х16 MVA
2х100 MVAr
45.5 km
434.6 km

668 MVA
 Controlled shunt reactor 
(180+60) MVAr
Shunt reactor (180+60) MVAr
382.97 km
332.04 km
Shunt reactor (180)
 MVAr 

101.7

33.8

48.63

1.11

2.4

35.14

10.46

1.83

How can the current economic 
environment in Russia influence 
the implementation of Federal 
Grid’s investment programme?

“The current economic environment 
is characterised by higher borrowing 
cost, limited financial market, growth 
of inflation and currency exchange 
rates, non-payments by consumers for 
electricity transmission and technological 
connections. In view of this environment, 
Federal Grid established the limits for 
financing of investments for 2015 at RUB76 
billion. 

In order to meet this limit, the priority in 
our investment programme is given to 
such projects as prevention of accidents 
at the Grid’s facilities, improving reliability 
of the Grid’s operation, developing 

facilities included in the plan of measures 
designed to meet target reliability and 
quality indicators and a number of other 
projects developed in accordance with the 
Scenario-Based Conditions for Developing 
Investment Programmes. 

the technical conditions of the Unified 
National Electric Grid and objectives of 
national importance, such as supporting 
the operation of the most important and 
socially significant facilities, will be met.”

Despite the reduced level of financing, 
the implementation of Federal Grid’s 
investment programme shall ensure that 
all key objectives in the area of maintaining 

Nikolay Pozdnyakov
Deputy Chairman of the Federal  
Grid’s Management Board

Adjustments to the Investment Programme

In accordance with the “Rules for approv-
al of investment programmes for electric 
power companies that include the State 
as a participant in their authorised  share 
capital and grid companies”, adopted by 
the Resolution of the Russian Govern-
ment No. 977 dated 1 December 2009, as 
amended by the Decree of the Russian 

Government No. 132 dated 16 February 
2015,  Federal Grid Company has drafted 
changes to its investment programme 
for the period 2015-2019 (adjustments to 
the investment programme for the year 
2015) and has prepared a draft of the 
investment programme for the period 
2016-2020. These documents envisage 

downward adjustments of the invest-
ment programme parameters (including 
financing, commissioning of fixed assets) 
for the purpose to maintain high financial 
reliability of the Company in the environ-
ment of volatile financial markets, higher 
borrowing costs and deterioration of 
payment discipline.

IINNOVATIVE DE VELOPMENT PROGR AMME
Innovative Technology for Better Reliability

Federal Grid Company’s innovative devel-
opment is aimed at enhancing the relia-
bility, quality and economy of the supply 
of electricity to consumers by upgrading 
the electric grids of the Russian Unified 
Energy System with the use of innovative 
technology to turn them into an intellectu-
al core of the technology infrastructure of 
the national electric energy sector.

Our Management Board and the Board 
of Directors’ Strategy Committee have 
approved key provisions of Federal Grid’s 
Innovative Development and Moderni-
sation Policy, which, once implemented, 
will result in the creation of a smart grid 
based on innovative solutions.

In order to achieve the goals and objec-
tives of our innovation policy, we have 
developed a comprehensive Innovative 
Development Programme for the years 
2013-2017 with an outlook through 20201. 

Our innovative development programme 
will improve the efficiency of utilisation of 
Russian’s energy potential, facilitate the 
development of new technologies, con-
tribute to further development of the na-

tional industry, reduce the percentage of 
imported equipment, and create favoura-
ble conditions for procuring the maximum 
benefits for the national economy.

As part of its Innovative Development 
Programme, Federal Grid is carrying out 
works aimed at fulfilling UNEG modern-

isation and development tasks, creating 
conceptual, technology and production 
fundamentals and favourable conditions 
for building a smart grid, and improving 
Federal Grid’s business processes and 
organisational mechanisms to achieve 
the goals and objectives of innovative 
development.

Key Areas of the Innovative Development Programme

Development of New Technologies 
and Release of Innovative Products
•  Development of the concept  
of a smart energy system
•  Development, testing and 
commercialisation of new 
technologies 

•  Development of new energy market 

services

•  Energy efficiency improvement 

programme

•  Programme to improve the 

environmental impact of Federal 
Grid Company

•  Collaboration with institutions of 
higher education and scientific 
organisations

•  Programmes to develop 

partnerships with innovative small 
and medium businesses

•  Interaction with venture capital 
businesses and the Skolkovo 
Institute of Science and Technology

Development of New 
Technologies
•  Integrated pilot projects to 

create a smart grid

•  Development, modernisation, 

and improvement of the energy 
efficiency of UNEG

•  Building of a production base 
for modernisation of UNEG

Innovative Business 
Processes
•  Improvement of business 

processes and introduction of 
new management methods
•  Development of a system of 

innovation activities

external impacts, etc. Prototypes of those 
solutions are currently used in various 
pilot projects being implemented at 
Federal Grid’s facilities.”

Which results have been 
achieved today in the area 
of Federal Grid’s innovative 
development?

“Innovations are a key component of 
Federal Grid’s technological reliability 
formula, so we have been implementing 
a comprehensive Innovative Development 
Programme since 2011.

As part of our efforts to implement that 
Programme, we are developing, testing 
and commercialising new technologies, 
preparing and implementing pilot 
projects to create a smart grid, and are 
aggressively taking steps to modernise 
and improve the energy efficiency of the 
Unified Energy System as a whole.

Our research and development works 
have resulted since 2011 in more than 
220 certificates and patents obtained, 
including 10 international ones, for 
various utility models and inventions 
in the area of electric energy, such as 
our achievements in high-temperature 
superconductivity, steel multifaceted 
supports and fundamental structures 
for power transmission lines, electric 
grid monitoring systems and systems 
for protection of electric grids against 

Pavel Korsunov
Deputy Chairman of the 
Management Board of 
Federal Grid Company

48

49

1 As approved by a resolution passed by the Management Board of Federal Grid Company (Minutes No. 1167/2 dated 26 April 2013).

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENTA

B

C

D

E

F

G

H

I

BAM and Transsib

BRELL

Development of Backbone grids

Renovation

Ensuring capacity delivery

Technological connection

Programmes of national significance

Other

Power suply to Southern Federal District

101.7

/

18%

33.8

32.1

/

/

6%

 6%

108.1

/

19%

48.6

/

9%

122.2

/

22%

23.9

48.3

45.0

/

/

/

4%

8%

8%

I

H

A

G

F

B

C

D

%

E

Динамика объема финансирования НИОКР, млн руб.

Выручка, млн руб.

3,0

2,0

1,0

0,0

2.9

1.9

1.7

1.0

0.4

2010 

2011 

2012 

2013 

2014

138,137

138,836

111,085

168,941

155,352

50

0

2010 

2011 

2012 

2013 

50

2014

Динамика структуры активов, млн руб.

1 214 291

1 231 217

1 122 995

1 037 493

902 110

Размер стандартизированной 
ставки С1 в 2013-2015 гг., 

руб./кВт (без НДС)

27,56

27,56

28,61

2014 Results of the Innovative Development Programme

Smart Grid 

Our continued focus on activities to in-
troduce innovations and related activities 
became a key systemic outcome of our 
efforts to implement the Innovative Devel-
opment Programme in 2014. That out-
come was reached thanks to the fact that 
considerable results meeting the innova-
tiveness criteria were achieved during the 
years 2010-2013 in implementing various 
R&D projects and programmes, i.e. in re-

spect to implementation of the Smart Grid 
Concept and due to the objective need for 
practical approbation and introduction of 
innovative solutions at UNEG facilities.

Given the completion of the main scope 
of construction and installation works as 
part of the ongoing innovative projects 
and reduction of Federal Grid’s Invest-
ment Programme due to the change of the 

growth scenario for electricity trans-
mission tariffs, only RUB1,280,400,000 
were spent to implement the Innovative 
Development Programme instead of the 
planned RUB11,389,500,000. Neverthe-
less, thanks to an increase in the efficien-
cy of our investment activities, we were 
able to fulfil most of the key performance 
indicators of that Programme in the re-
porting year.

2014 Innovation Costs as Broken down by Investment 
Programme Item, RUB1,000,000

A

B

C

R&D programme

Integrated pilot projects to create an 
active-adaptive grid with the use of innovative 
technologies and energy efficiency

419.4

2,598.8

/

/

14%

84%

Creation of training centres for Federal 
Grid’s operating staff

76.6

/

2%

B

B

C

C

A

A

%
%

Meeting Key Performance Indicators of Federal Grid’s 
Innovative Development Programme in 2014

In the future, our efforts to imple-
ment the Innovative Development 
Programme are expected to result 
in the creation of an electric energy 
system with a smart grid differing 
from the existing grid by the follow-
ing innovative elements:

• Automated electricity transmis-

sion systems

• Active grid elements with varia-

ble parameters

• Automated real-time systems to 
keep the operation of the energy 
system within the limits set as 
part of a uniform analysis and 
decision-making system

• Current grid status monitoring 

system

The smart (active-adaptive) grid 
and the principles of management 
of the energy system will be built 
on the priority of systemic factors 
and conditions – reliability and 
economy of the system as a whole.

Smart Grid Diagram

Power generation and alternative
energy sources

Smart grid component

Consumers

2013 actual

2014 target

2014 actual

Assessment of 
whether or not the 
KPI has been met

Industrial installations

Smart grid

Energy transmission and storage 
(high-power batteries)

Trend of reducing the cost of repair of a unit of grid equipment 
relative to the cost level of 2010, %

Чистая прибыль (убыток), млн руб.
Share of the spending on equipment purchased from domestic 
manufacturers in the total spending on equipment purchasing, %

Share of electricity lost in the total volume of electricity transmitted 
through the grid, %

57,082

Number of company staff per 100 km of power transmission lines 
(number of people)

Area of land in metropolitan areas freed from the grid 
infrastructure, ha 

2010 

2011 

2012 

2013 

5,137

2014

1

38

4.28

14.76

200

Met
Полная себестоимость, млн руб.

2.5

2

35

4.47

15
92,900

400

44.5

Met

4.13

132,948

140,259

Met

116,510

14.56

Met

0

Not met

82,501

2010 

2011 

2012

2013

2014

Share of undersupply of electricity to consumers in the total volume 
of electricity transmitted through UNEG, %

-2,468

0.0006

0.0027

0.0002

Number of exclusive rights documents (patents and registration 
-25,898
certificates) obtained through the R&D work for the year

-24,532

Number of technologies and products developed and introduced 
into production through the R&D work, pcs.

The share of R&D expenditure at FGC’s own expense relative to the 
revenue (from electricity transmission through UNEG), %

55

4

1.1

20

2

1.1

Share of funds secured from external sources in the total financing, %

Диаграмма динамика долгового портфеля ОАО «Ф СК ЕЭС», млрд руб.

2.0

0

Share of expenditures on R&D performed by universities relative to 
the total R&D expenditure, %

300

2.4 

1.0

Met

Met

Met

56

9

0.25

Not met

0

6.7

Not met

Met

Power transmission lines

New Principles and Technologies Underlying the Smart Energy System with 
Active-Adaptive Grid

• The smart grid is rich with active 
components that allow changing 
its topological parameters

• Sufficient number of sensors to 
measure current mode param-
eters for monitoring the grid con-
dition in various operation modes 
of the energy system

• Data collection and processing 
system and controls for grid 
active components and consumer 
electric installations

• Tools for automatically assess the 
current conditions and preparing 
grid operation forecasts

• High-performance control system 

• Necessary actuators and mecha-

and fast data exchange

nisms for real-time measurement 
of grid topological parameters 
and interaction with adjacent 
power assets

250

200

1050

100

50

0

56,0

17,5
35,0

160,0

50

25,0

105,0

100,0

17,5

164,8

100,0

17,5

140,3

5151

2010

2011

2012

2013

2014

2013 

2014 

2015

2010 

2011 

2012 

2013 

2014

Облигации

Кредиты

Еврооблигации

Инфраструктурные облигации

Основные средства

Незавершенное строительство

Авансы под внеоборотные

активы

Долгосрочные

финансовые вложения

Оборотные

активы

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENTСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсоналRussia’s First Digital Substation

In 2014, we completed our work 
to build Russia’s first digital 
substation, which, in addition 
to performance of its designed 
functions, also serves as a test 
ground for development of new 
innovative solutions in this 
field.

Our new digital substation will 
enable us to implement the 
following tasks:

trol devices based on IEC 61850-
9.2 and IEC 61850-8.1 as well as 
develop and test the optimum 
structure of a “process bus” 
based on IEC 61850-9.2 

• Comprehensively the test digital 
substation equipment in both 
normal and emergency opera-
tion conditions of the simulated 
electric grid

• Make electric grid operation 

• Test next-generation digital 

monitoring, protection and con-

more reliable and begin migrat-
ing to “unattended” substations

R&D

Federal Grid’s Innovative Develop-
ment Programme includes R&D works 
to develop and test breakthrough and 
enhancing innovative technologies. The 
breakthrough technologies includes dig-
ital substation, electric equipment based 
on high-temperature superconductivity, 
multi-agent control systems, and energy 
accumulation.

We are currently implementing our R&D 
Programme for the Years 2014-2018. It 
is designed to ensure stable, long-term 
funding of our efforts to develop state-
of-the-art technologies, equipment and 
devices and is aimed at enhancing the re-
liability, quality and economy of consumer 
power supply by upgrading the Russian 
UES grids and turning them into a smart 
core of the future power technological 
infrastructure.

Target Subprogrammes 
under the R&D 
Programme

• Digital substation

• New materials and 

designs

• Process Management

• Operation and monitoring

• Digital design

• Power conversion and 

transmission

101.7

/

18%

33.8

32.1

/

/

6%

 6%

108.1

/

19%

48.6

/

9%

122.2

/

22%

23.9

48.3

45.0

/

/

/

4%

8%

8%

I

H

A

G

F

B

C

D

%

E

R&D programme

A

B

Integrated pilot projects to create an 

active-adaptive grid with the use of innovative 

technologies and energy efficiency

419.4

14%

2,598.8

84%

/

/

C

Creation of training centres for Federal 

76.6

/

2%

Grid’s operating staff

B

C

%

A

A

B

C

D

E

F

G

H

I

BAM and Transsib

BRELL

Development of Backbone grids

Renovation

Ensuring capacity delivery

Technological connection

Programmes of national significance

Other

Power suply to Southern Federal District

In accordance with our Investment 
Programme, we spend RUB419 mln to 
implement our R&D Programme in 2014. 
The reduction of the R&D funding volume 
compared to the previous year was 
caused by some adjustments we made to 
our Investment Programme in line with a 
change of the power transmission tariff 
growth scenario.

R&D funding,
RUB bln

3,0

2,0

1,0

0,0

2.9

1.9

1.7

1.0

0.4

2010 

2011 

2012 

2013 

2014

Динамика объема финансирования НИОКР, млн руб.

Выручка, млн руб.

As part of our efforts to implement the 
R&D Programme, we reached the follow-
ing key results in 2014:

•  We developed a prototype of a 220-kV, 
63-MVA power gas-insulated trans-
former that will reduce substation 
maintenance and fire-extinguishing 
system costs as well as land-use costs 
by providing a more efficient substation 
setup.

•  We developed and built a pre-produc-
tion model of a thyristor-controlled 
phase-shifting device designed to be 
installed on the 500-kV Voskhod substa-
tion that will eliminate overload on the 
220-kV Tatarskaya-Voskhod overhead 
transmission line and control the 
Ural-Siberia power flow by re-distrib-
uting power among the relevant links; 
prevention of loop power flows is likely 
to yield 200-300 MVA in potential reduc-
tion of power losses in the grid adjacent 
to the 500-kV Voskhod substation.

111,085

2010 

•  We developed a prototype of a remote 
temperature control system for con-
tact joints and some components of a 
overhead transmission line (such as 
loop joints and terminal and connecting 
clamps), which system is designed for 
collection, storage and online trans-
mission of overhead transmission line 
technical condition data.

138,137

168,941

138,836

•  We developed sets of documents on 
aesthetic single-circuit and twin-cir-
cuit supports for 220-kV overhead 
transmission lines sufficient for use in 
155,352
high-voltage power transmission line 
new construction and reconstruction 
projects; those supports are designed to 
be installed in metropolitan centres, at 
entrances to cities and towns, along ring 
and bypass roads, and at approaches 
to substations within the precincts of 
cities and towns to improve the aesthetic 
2013 
appearance of backbone power trans-
mission lines.

2012 

2014

50

50

0

2011 

Динамика структуры активов, млн руб.

As part of our 
efforts to implement 
our R&D Programme, 
Federal Grid Company 
had 56 intellectual 
properties registered 
with Rospatent in 2014, 
including:

1 037 493

1 122 995

902 110

1 214 291

1 231 217

26

computer software 
certificates

11

utility model 
patents

19invention  

Размер стандартизированной 
ставки С1 в 2013-2015 гг., 
руб./кВт (без НДС)
patents

27,56

27,56

28,61

2010

2011

2012

2013

2014

2013 

2014 

2015

2010 

2011 

2012 

2013 

2014

Основные средства

Незавершенное строительство

Облигации

Кредиты

Еврооблигации

Инфраструктурные облигации

Авансы под внеоборотные
активы

Longer-term Plans

Долгосрочные
финансовые вложения

Оборотные
активы

Чистая прибыль (убыток), млн руб.

57,082

Полная себестоимость, млн руб.

132,948

140,259

116,510

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012

2013

2014

5,137

92,900

82,501

-2,468

-24,532

-25,898

Диаграмма динамика долгового портфеля ОАО «Ф СК ЕЭС», млрд руб.

300

250

200

1050

100

50

0

25,0

105,0

56,0

17,5

35,0

160,0

100,0

17,5

164,8

100,0

17,5

140,3

Given the limited funding in the years 
ahead, we intend to concentrate on 
improving the quality and efficiency of 
planning and implementation of our R&D 
Programme and focus our efforts on the 
most advanced and critical areas of our 
innovative activities.

We also plan to further actualise our 
“open innovation” tools for working with 
our partners in innovative development 
in the following areas:

•  Development and popularisation of 
Federal Grid’s public documents 

and Internet resources concerning 
innovative development, oriented to 
our partners and counterparties and 
setting out goals and objectives, key 
requirements and technologies, and 
other important information related 
to modernisation of UNEG, building 
of a smart grid and other areas of our 
innovative development

•  Further development of innovative 

competencies centres established with 
participation or support from Federal 

Grid Company on the premises of uni-
versity labs, chairs, departments and 
small innovative “subsidiaries” and 
based on innovation contests

•  Development of public-private part-

nership mechanisms

•  Development of management mecha-
nisms for Federal Grid’s knowledge, 
competencies and production system 
to maximally use our internal reserves 
for innovative development

52

53

PERFORMANCE RESULTS / INVESTMENTS AND INNOVATIVE DEVELOPMENTMANAGEMENT’S DISCUSSION AND ANALYSIS 
FINANCIAL PERFORMANCE

Federal Grid’s key financial performance indicators

FINANCIAL PERFORMANCE

Operational Efficiency Leads to Better Financial 
Performance 

What were the implications of 
the changes in the country’s 
economic environment in 
2014 for Federal Grids’s 
performance results?

• Reduction of administrative and
management expenses by 15%
compared to the 2013 level – in
compliance with the Directive
of the Russian Government No.
2454p-P13 dated 23 April 2014

Timely measures taken by the 
Company’s management in 
response to dramatic change in 
the Russian economic environment 
in 2014 enabled to minimise the 
impact of negative factors on 
Federal Grid’s operations and 
achieve strong performance results 
for that year.

In 2014, for the first time in recent 
years, Federal Grid earned net 
profit of RUB5.1 billion, and a 
proposal was made to pay out 
dividends.”

“Responding to changes in the 
economic situation, at the end of the 
year Federal Grid took immediate 
steps to ensure that we maintain 
liquidity and are able to repay our 
financial liabilities with our own 
funds, which included reduction 
in investment cash outlay by 20%, 
we also stepped up measures to 
enforce repayment of overdue 
receivables.

In the current recession 
environment our key priority is cost 
cutting, which in 2014 was rather 
successful: 

• Above-target reduction of

operating expenditure – by 21.7%
from the 2012 level – following
the guidance in the Strategy
of the Electric Grid Complex
Development of the Russian
Federation, under which the
target for reduction is 15% by
2017

Does, in your view, Federal Grid 
have sufficient funds available 
to finance the implementation 
of further development plans in 
2015?

“In 2015, in the environment 
of declined paying capacity of 
electricity transmission services 
consumers, Federal Grid is not 
planning to raise any additional 
loans or other debt finance; we 
are going to use our own funds 
for exercising bond put options 
thus continuing to reduce our loan 
portfolio. Currently, the levels of 
financing under the investment 
programme approved by the 
Ministry of Energy of the Russian 
Federation for 2015-2019 are being 
reviewed in the light of the objective 
to maintain the Company’s financial 
stability while ensuring fully reliable 
operation of its facilities. Along with 
the reduction of the investment 
programme, we use measures 
aimed at raising finance with the 
government support, including 
issuing infrastructure bonds.”

Andrey Kazachenkov
First Deputy Chairman of 
the Management Board,
Member of the 
Management Boar of 
Federal Grid Company

RUB million

Revenues, including: 

2010

2011

2012

2013

2014

111,085

138,137

138,836

155,352

168,941

Electricity transmission services 

109,510

134,875

136,581

152,710

159,881

Other operations 

1,574

3,262

2,255

2,642

9,060

Full cost (costs and management expenses)

82,501

92,900

116,510

132,948

140,259

Sales profit 

Other income*

Other expenses**

Profit (loss) before tax 

Deferred tax assets 

Deferred tax liabilities 

Current profit tax

Other similar mandatory payments 

Profit tax adjustment for the previous periods 

28,584

45,236

22,326

22,404

28,682 

150,765

175,670

113,556

61,125

35,058

112,037

209,463

150,152

101,201

49,402

67,312

11,444

- 14,270

-17,672

14,338

- 33

46

-55

1,776

-816

- 1,181

-5,545

- 8,736

- 9,977

- 8,367

- 9,264

- 8,390

- 1,471

43

206

- 3

- 21

- 0,3

-

-

- 5

- 20

-

- 18

-

Net profit (loss) for the period

57,082

- 2,468

- 24,532

- 25,898

5,137

Adjusted EBITDA ***

68,301

84,683

82,809

96,296

99,603

* Other Income includes income from participation interest in other organisations and interest receivable

** Other Expenses include interest payable

*** Not including entries re charging and recovery of doubtful debts, revaluation of assets and revenue relating to technological connection

Based on the results of the Federal Grid’s financial performance 
analysis, it should be noted that there was an upward trend in 
revenues over the period 2010-2014. 

Federal Grid’s performance results for 2014 indicate an increase 
in the Company’s operating efficiency confirmed both by income 
growth and cost optimisation under the restriction on tariff growth.

Динамика выручки, себестоимости  и чистой прибыли
Revenues, expenses and net profit in 2010-2014, RUB million

57 082

92 900

138,137

138,836

116 510

111,085

116,510

155,352

168,941

5 137

132,948

132 948

140,259

140 259

92,900

138 137

138 836

155 352

82 501

82,501

57,082

111 085

168 941

5,137

2010

2010

2011

2011

–2,468

2012
2012

2013

2013

2014

2014

-2 468

- 24 532

- 25 898

Revenues

Full cost

Net profit (loss)

–24,532

–25,898

54

55

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSIS2010

2011

2012

2013

2014

Change in  
2014/2013

Change in 
2014/2013, 
%

•  disposition of personnel was opti-

mised with a partial release of office 
space (a lease agreement relating to 
non-residential space in Moscow at the 
address Nametkina Street, bldg 12A, 

was terminated; currently, some of the 
Company’s subdivisions are moving to 
the building at Belovezhskaya Street, 
bldg 4) 

•  optimisation of headcount was conducted. 

Revenue structure in 2010-2014

RUB million

Revenues, including:

Revenues from electricity transmission services

109,510

134,875

136,581

152,710

159,881

7,172

111,085

138,137

138,836

155,352

168,941

13,589

8.7%

4.7%

Revenues from technological connection services

Revenues from other operations

609

965

2,127

1,077

986

7,002

6,016

610.2%

1,135

1,178

1,656

2,058

402

24.3%

Revenues

During 2014, Federal Grid’s revenues 
grew from the 2013 level by 8.7%, in-
cluding revenues relating to electricity 
transmission through UNEG by RUB7,172 
million (4.7%) and relating to providing 
services under agreements on tech-
nological connection for the amount 
of RUB6,016 million. The reasons for 
this included stepped-up work to chase 
payments of applicants, including in re-
spect of generation facilities, taking into 
account the investment expenses for con-
structing new and developing the existing 
grid infrastructure to provide generating 
capacity in line with the Amendments 
to the Federal Law On Electric Power 
Industry No. 35-FZ dated 26 March 2003 
effective from 6 November 2013.

Cost and management expenses 
in 2010-2014

RUB million

2010

2011

2012

2013

2014

Full cost (cost and management 
expenses), including

82,501

92,900

116,510

132,948

140,259

Production costs*

43,953

44,390

47,657

51,056

49,974

Management expenses 

4,647

6,940

7,326

7,412

6,843

Depreciation and property tax

33,901

41,570

61,527

74,480

83,442

* includes part of administrative expenses

Cost optimisation 

In order to increase efficiency of the Fed-
eral Grid’s operations and to optimise the 
volume and structure of production costs 
and management expenses, the Company 
developed a comprehensive Programme 
for Improving Efficiency of Operations 
approved as part of the Federal Grid’s 
business plan for 2014-2018.

The results of our efforts designed to im-
prove the Company’s performance in 2014 
were the following:

Production costs 

The key factors for a decrease in produc-
tion costs in 2014 compared to 2013 are: 

•  a RUB1,524 million (28%) decrease 
in the volume and cost of the work 
performed by third-party contractors 
on repairs and maintenance under the 
programme for improving the Federal 
Grid’s operational efficiency;

•  a RUB267 million (16%) increase in 

expenses relating to electricity tran-
sit services due to rouble weakening 
(transit of electric power is effected 
via foreign grids) and indexation of the 
transit service tariff.

Management expenses 

The key drivers for lowering management 
expenses in 2014 compared to 2013 are 
the following:

•  expenses relating to consulting services 
increased by RUB418 million (337%) due 
to the entering into a service contract 
with JSC Rosseti for arranging oper-
ation and developing the electric grid 
complex; 

•  software purchase and maintenance 
costs were reduced by RUB270 (18%) 

within the programme for increasing 
the Federal Grid’s performance effi-
ciency and effectiveness;

•  labour costs, social charges and insur-
ance payments decreased by RUB223 
million (8%) as a result of the headcount 
optimisation;

•  property lease payments were reduced 
by RUB190 million (26%) as a result 
of acquisition of an office building at 
Belovezhskaya Street.

Depreciation and property tax 

The key factors for the changes in costs 
and expenses in 2014 compared to 2013 
are the following:

•  depreciation payments increased by 
RUB7,156 million (10%) due to adding 
new electric grid facilities to fixed 
assets as part of the implementation of 
the investment programme, and to the 
revaluation of fixed assets carried out 
by the Company;

•  property tax increased significantly by 
RUB1,807 million (50%) due to intro-
duction of a large number of new fixed 
assets from prior years and to the 
repeal of property tax benefits relating 
to power transmission lines.

In the future, Federal Grid will continue to implement the adopted programmes for improving performance efficiency. The Company 
is also planning to carry out projects of internal and external benchmarking, which will enable to establish cost optimisation target 
values – both for MES branches and for Federal Grid as a whole.

Federal Grid’s key operating and financial performance 
indicators (reflecting measures implemented under 
the Cost Management Programme)

Expenses included in the basis of 
the Cost Management Programme 
(in 2012 prices), RUB million *

Amount of equipment in 
maintenance, c.u**

Increase in c.u. relative to the 2012 
level (with account of the elasticity 
coefficient of operating expenses by 
volume of assets, Q = 0.75)

Adjusted fixed expenses per 1 c.u. (in 
2012 prices), RUB ‘000/c.u.

Reduction in unit operational 
expenditure, %

Adjusted fixed expenses (with 
account of increase in c.u. and 
consumer price index), RUB 
‘000/c.u.

2012

2013

2014

Change in 
2014/2012

37,534

36,708

32,343

-5,191

-13.8%

1,139,492 1,227,400 1,254,789

115,297

10.1%

-

1.058

1.076

-

-

32.9

29.9

25.8

-7.2

-21.7%

-

-9.2%

-21.7%

-

-

37,534

34,700

30,062

-7,472

-19.9%

*controlled  expenses (excluding electricity bought to cover losses, transit of electricity, depreciation of fixed 
assets and amortisation of intangible assets, taxes and charges, etc.) 

** based on data provided by Federal Grid’s operating units (actual data may be adjusted based on evaluation 
by a special organisation)

The results of 2014 show that the Compa-
ny has fulfilled all assignments in respect 
of improving its operational efficiency:

•  Administrative and management ex-

penses were reduced by 15% compared 
to the 2013 level, in compliance with the 
Directive of the Russian  Government 
No. 2454p-P13  dated 23 April 2014, to 
RUB11,427 million in 2014

•  The Company achieved a reduction of 
operating expenditure (OPEX) com-
pared to the 2012 level, which was 
above the target set by the Strategy 
of the Electric Grid Complex Develop-
ment of the Russian Federation (21.7% 
in 2014 vs. target of 15% in 2017); the 
effect from the implementation of the 
programme was RUB7,472 million

•  Unit investment expenditure (CAPEX) 

was decreased by 17.03% as compared 
with the 2012 level, in accordance with 
the recommendations of the Strategy of 
the Electric Grid Complex Development 
of the Russian Federation 

•  The Company earned net profit in the 

amount of RUB5,137 billion

•  The Company’s debt remains within 

sustainable limits as established by our 
debt policy, i.e. at 3.0*EBITDA, for 2014 
the debt level was RUB 257,8 billion 
(2.6*EBITDA)

•  purchasing costs decreased by 10-25%;

Other income and expenses

EBITDA 

Net profit (loss) 

•  cost of purchases under long-term 

agreements (supply of transformer oil, 
protective clothing, inputs, provision 
of service maintenance of compressor 
machinery, cleaning of transmission 
line paths, technical maintenance and 
repairs of by Elektrosetservis) was 
reduced; 

•  fees under agreements on providing 
security services for facilities were 
reduced;

•  fees under agreements for IT services 

were reduced (supplement agree-
ments were entered into that provided 
reduction of fees at the current volume 
of services);

In 2014, Federal Grid’s other income and 
expenses decreased as compared with 
2013 by RUB27,239 million and RUB55,894 
million respectively – due to the decrease 
in transactions for purchase/payment of 
bank promissory notes as part of meas-
ures for placement of temporarily dispos-
able monetary resources in the amount 
of RUB45,811 million, and due to the 
increase, in the reporting year, in recov-
ered doubtful debt reserves of RUB17,539 
million,  decrease in the amount of 
provisions for impairment of investments 
(including in shares of JSC INTER RAO 
UES) and provisions for doubtful debts in 
the amount of RUB18,424 million, and an 
increase in expenses due to the write-
down of fixed assets by RUB1,093 million.

Adjusted earnings before interest, tax, 
depreciation and amortisation (EBITDA) 
increased by RUB3,307 million (3%) as 
compared with the same period of 2013, 
to RUB99,603 million

In 2014, for the first time in recent years, 
Federal Grid earned net profit in the 
amount of RUB5,137 million

In the light of dividends paid out for Q1 
2014 in the amount of RUB437 million and 
net profit earned, the management will 
propose to the Board of Directors to rec-
ommend to the General Meeting of Share-
holders to pay out dividends for 2014 in 
accordance with the adopted business 
plan and Federal Grid’s dividend policy

56

57

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSIS2010-2014 Net Profit Distribution

RUB million

Retained net profit (loss) for the 
reporting period is allocated as 
follows:

Reserve fund

Development

Covering of previous years’ losses, 
remuneration of Board members

Dividends

2010

2011

2012

2013

Q1 2014

2014*

GMS Minutes 
dated 
04.07.2011 
No 11

GMS Minutes 
dated 
02.07.2012 
No 12

GMS Minutes 
dated 
02.07.2013 
No 13

GMS Minutes 
dated 
30.06.2014 
No 15

GMS Minutes 
dated 
30.06.2014 
No 15

target

58,088

-2,468

-24,532

-25,898

437

4,700

2,904

18,578

34,028

2,578

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

437

257

-

3,596

847

* The decision on the allocation of 2014 earnings is to be made by the General Meeting of Shareholders scheduled for June 2015

A

B

C

D

E

F

G

H

I

FINANCIAL POSITION

Asset and Liability Structure

RUB million

Total assets

Non-current assets

Current assets

Total liabilities 

Shareholders’ equity

Long-term liabilities

Short-term liabilities

БАМ и Транссиб

БРЭЛЛ

Развитие магистральных сетей

Реновация

СВМ

31.12.2010
Технологическое присоединение

31.12.2011

31.12.2012

Программы общегосударственного значения

1,037,493

902,110

1,122,995

Прочие

767,152

919,501

1,011,667

Энергоснабжение южного федерального округа

134,958

117,992

111,328

G

F

101,7

/

18%

33,8

32,1

/

/

6%

 6%

108,1

/

19%

48,6
/
31.12.2013
122,2
/

9%

31.12.2014

22%

23,9
/
1,214,291

4%

1,231,217

48,3
/
1,092,629
45,0
/
121,662

8%

8%

1,117,921

113,296

I

H

A

B

C

D

%

E

Программа НИОКР

A

B

Комплексные пилотные проекты создания

2 598,8

84%

активно-адаптивной сети с применением инно-

вационных технологий и энергоэффективность

419,4

14%

/

/

C

Создание учебных центров подготовки 

76,6

/

2%

производственного персонала ФСК

B

C

%

A

902,110

1,037,493

1,122,995

1,214,291

1,231,217

794,192

853,079

849,125

842,975

854,490

52,668

138,054

209,360

282,429

267,435

55,250

46,360

64,509

88,887

109,292

CA SH FLOW

Net cash flows

RUB million

Net cash flows

2010

2011

2012

2013

2014

-69

6,004

281

-3,196

22,149

Net cash flows from operating activities

77,582

99,194

100,494

86,688

106,499

Net cash flows from investing activities

-121,712

-163,742

-173,183

-163,485

-59,335

Net cash flows from financial activities

44,061

70,552

72,970

73,601

-25,015

Net cash flows from operating activities 
consist of the following:

•  Cash inflows from electricity transmis-

sion services via UNEG in the amount of  
RUB150,992 million

•  Cash inflows from technological 

connection via UNEG in the amount of 
RUB5,384 million

•  Cash inflows in the form of return of 
funds under bank guarantees in the 
amount of RUB1,920 million under con-
tracts for work and services relating to 
the construction, technical upgrade and 
reconstruction of Federal Grid’s capital 
facilities due to the contractors’ failure 
to perform / perform properly their 
contractual obligations

•  Cash inflows resulting from leasing the 
Company’s property in the amount of 
RUB1,000 million

•  Receipts from the sale of long-term 
financial investments for RUB2,779 
million

•  Payments within operating activities, 
material expenses, labour and insur-
ance payments, cash outlays relating to 
maintaining property and other oper-
ating outflows – for the total amount of 
RUB 41,694 million

•  Payments to cover electricity transmis-
sion losses in the amount of RUB12,002 
million

•  Net cash flows from investing activities 

are the result of the following:

•  Placing temporarily disposable funds 
in bank accounts as deposits in the 
amount of RUB39,346 million

•  Payments for acquisition, construction, 
upgrading, reconstruction and prepara-
tion for operation of non-current assets 
in the amount of RUB 77,198 million

•  Interest payments relating to bond 
issues in the amount of RUB22,321 
million

Net cash flow from financial activities in 
the amount of RUB25,015 million resulted 
from repayment of long-term loans total-
ling RUB24,578 million (buy-out of bond 
issues of the 15th and 18th series).

The above evolution of the balance 
sheet items indicates that both assets 
and liabilities increase every year.

Federal Grid’s total assets as at 31 
December 2014 were higher than those 
at the end of 2013 by RUB16,926 million 
(1.4%), which was due to the following 
factors (amongst other things):

•  Increase in the value of non-current 
assets by RUB25,292 million (2.3%), 
which was caused by large-scale in-
vestments in the construction of large 
fixed assets under the Federal Grid’s 
investment programme and decrease 
in the level of construction in progress 
and advances paid out for the acquisi-
tion of non-current assets

•  Decrease in current assets by 

RUB8,366 million (6.9%) because of the 
decrease in short-term financial in-
vestment compensated by the increase 
in cash balance in the Company’s 
settlement account and in the accounts 
receivable

As at 31 December 2014, the asset 
structure did not change compared 
to 31 December 2013:  the shares of 
non-current and current assets were 
91% and 9% respectively.

On the other side of the balance sheet, 
the greatest part is shareholders’ equi-
ty at 69.4%, whereas short-term and 
long-term liabilities represent 30.6%.

Federal Grid’s shareholders’ equity 
increased during the reporting period 
by RUB11,514 million (1.4%), which 
was due to reflecting in the accounts 

Динамика объема финансирования НИОКР, млн руб.
retained earnings of RUB4,700 million 
(the amount was calculated taking into 
account interim dividends for Q1 2014) 
, increase of the share capital by the 
amount of a new share issue for 2013 
3,0
in the amount of RUB3,762 million 
registered by the Bank of Russia, and 
2,0
reflection of the revaluation of the 
Company’s fixed assets (RUB2,562 
1,0
million).

managed to exercise put options in 
respect of its bond issues (series 
18: RUB14,890 million and series 15: 
RUB9,688 million) using the Company’s 
own funds without raising any addition-
al finance to refinance the debt under 
the current debt market deterioration.

1.0

1.9

2.9

1.7

0.4

As a result, the level of Federal Grid’s 
loans (excluding any interest accrued) 
decreased during the reporting period 
by RUB24,578 million to RUB257,771 
million as at the end of 2014.

2014

0,0
Thanks to measures taken to increase 
its operating efficiency, Federal Grid 

2010 

2012 

2011 

2013 

Выручка, млн руб.

Полная себестоимость, млн руб.

Чистая прибыль (убыток), млн руб.

138,137

138,836

57,082

111,085

132,948

140,259

116,510

168,941

155,352

50

0

5,137

92,900

82,501

2010 

2011 

2012 

2013 

50

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012

2013

2014

-2,468

-24,532

-25,898

Динамика структуры активов, млн руб.

Asset Structure Trend,  
RUB million

1,122,995

111,329
52,803
65,670

296,462

594,543

1,037,493

117,992
82,047
83,665

305,202

446,893

902,110

134,958
104,138
95,801

289,338

276,063

1,214,291

1,231,217

121,662
30,406
56,921

287,896

113,296
25,765
39,762

259,595

715,009

788,861

Размер стандартизированной 

ставки С1 в 2013-2015 гг., 

руб./кВт (без НДС)

27.56

27.56

28.61

2010

2011

2012

2013

2014

2013 

2014 

2015

2010 

2011 

2012 

2013 

2014

Fixed assets

Work in progress

Advances on 
non-current assets

Long-term financial i
nvestments

Current assets

Диаграмма динамика долгового портфеля ОАО «ФСК ЕЭС», млрд руб.

300

250

200

1050

100

50

0

25.0

105.0

56.0

17.5

35.0

160.0

100.0

17.5

164.8

100.0

17.5

140.3

Bonds 

Bank loans 

Eurobonds 

Infra structure bonds

58

59

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSISNet asset value

RUB million

Nominal net asset value *

Net asset value (calculated with account to contributions to the 
authorised capital) **

* Estimate based on annual accounts with retrospective adjustment

2010

2011

2012

2013

2014

794,470

853,354

849,400

842,975

855,251

805,617

855,573

852,647

846,731

855,251

** In 2012 and 2013, the authorised capital of Federal Grid Company was increased through an additional share issue. It led to the reporting of accounts payable to the 
shareholders on their contributions to the authorised capital in the Company’s accounting statements. Upon registration of the placement report with the Russian FFMS, 
these accounts will be included in the Federal Grid Company’s authorised capital. An evaluation of net asset value was made with regard to this inclusion: in the amount 
of RUB2,219 million for 2011, RUB3,247 million for 2012 and RUB3,755.6million for 2013. 

Accounts payable

RUB million

Accounts payable, including

trade payables

notes payable

wages/salaries payable

accounts payable to the State non-budget funds

taxes and charges payable

advance payments received

dividends payable 

other accounts payable

 31.12.2012

31.12.2013

31.12.2014

40,017

19,676

58,051

41,424

77,551

67,206

- 

212

104

544

11,481

11

7,989

- 

205

55

961

8,498

13

6,895

-

221

84

1,326

6,085

9

2,620

 31.12.2012

31.12.2013

31.12.2014

61,254

53,842

60,163

Key financial indicators

Accounts receivable

RUB million

Accounts receivable, including

with maturity over 12 months from the reporting date: 

trade receivables

notes receivable

cash advances

other accounts receivable

with maturity within 12 months of the reporting date:

trade receivables

notes receivable

amounts payable by subsidiaries and affiliates in respect of dividends

amounts payable by shareholders as contributions to the authorised capital

cash advances

other accounts receivable

6,177

3,670

- 

- 

2,507

55,077

18,442

- 

- 

- 

1,710

1,111

5

- 

- 

1,705

52,132

22,061

- 

- 

- 

5

- 

- 

1,106

59,052

37,501

- 

- 

- 

1,696

1,933

1,559

34,939

28,138

19,992

In 2014, the Company’s pre-trial activities 
and legal proceedings were based on the 
following documents: 

•  Procedures for claim-related work in 

the Corporate Headquarters of Federal 
Grid Company approved by the Order 
No. 393 dated 04 July 2011

•  Procedures for interaction between the 
Legal Department and MES branch-
es in the area of claim-related work 
approved by the Order No. 394 dated 04 
July 2011

•  Regulation on claim-related work in 

the Corporate Headquarters and MES 
branches f Federal Grid Company 
approved by the Order No. 402 dated 16 
September 2014 

•  Procedures for interaction between 

Federal Grid and its subsidiaries and 
affiliates when performing claim-relat-
ed work approved by the Order No. 516 
dated 18 November 2014 

•  Procedures for managing Federal 

Grid’s receivables and payables ap-
proved by the Order No. 383 dated 09 
September 2014  

In 2014, Federal Grid was a party in 1,123 
court cases, as a result of which payment 
of RUB7,876 million for the Company’s 
benefit was enforced and court rulings 
were passed to decline claims against the 
Company for the total of RUB5,099 million. 

Within the pre-trial activities, the Compa-
ny filed 604 claims to its counterparties 

in respect of failure of the latter to fulfil 
their obligations towards the Company for 
the total amount of RUB1,019,309,685.8, 
of which claims for RUB38,988,948.56 
were settled. During the same period the 
Company received 257 pre-trial claims for 
the total amount of RUB381,280,635.5 and 
paid RUB18,818,304.59 out of this amount 
to settle the claims.

During the reporting period, the Company 
wrote off RUB834 million of unrecovera-
ble receivables, of which RUB29 million 
were written off as a charge to the profit 
(loss) account and RUB805 million as a 
charge to the previously accrued provi-
sion.

RUB million

Liquidity indicators 

Absolute liquidity ratio

Quick liquidity ratio

Current liquidity ratio

Financial stability indicators

Equity to total assets ratio

Total debt/EBITDA*

Current assets coverage ratio

Profitability indicators

Return on equity (ROE)*

Return on total assets (ROTA)* (based on profit before tax)

EBITDA margin*

Business activity indicators

Receivables/payables growth ratio

Total receivables/payables ratio

Most liquid receivables/payables ratio 

2010

2011

2012

2013

2014

1.31

2.73

3.08

0.88

0.7

0.53

3.4%

3.4%

60.7%

1.27

1.48

0.62

1.00

2.24

2.71

0.82

1.3

0.54

4.1%

4.4%

61.3%

1.45

1.42

0.51

0.68

1.58

1.83

0.76

2.3

0.37

1.6%

1.3%

59.6%

1.48

1.53

1.12

0.67

1.29

1.43

0.69

2.8

0.3

2.0%

2.8%

62.0%

1.17

0.93

0.53

0.39

0.93

1.04

0.69

2.2

0.03

1.6%

1.9%

59.0%

0.84

0.77

0.56

 * For the calculation of this indicator, EBITDA, net profit or profit before tax was not adjusted to reflect impact of external 
factors outside of of the Company’s management competence

As at 31 December 2014, the actual liquid-
ity ratios are within the statutory values, 
that proves the Federal Grid’s ability to 
meet its short-term liabilities by using its 
current assets.

The Company’s absolute liquidity ratio 
(recommended value: 0.2-0.5) shows 
that there remains a share of short-term 
liabilities that can be covered by cash and 
other highly liquid assets (securities or 
bank deposits).

The quick liquidity ratio (recommend-
ed value: ≥ 1) demonstrates a sufficient 
level of Federal Grid’s ability to repay 
short-term liabilities with the more liquid 
assets (cash, receivables, short-term 
investments).

The current liquidity ratio (recommend-
ed value: 1-2) demonstrates that the 
Company has retained its ability to repay 
its short-term liabilities with current 
assets.

The equity to total assets ratio (rec-
ommended value: 0.5-0.8) shows that 
Federal Grid’s dependence on external 
borrowings is within normal range and 
demonstrates that the risk of insolvency 
is low and that there is no risk of cash 
shortage.

Therefore, Federal Grid can be described 
as a financially sound company with a low 
level of financial dependence and capable 
of meeting its obligations.

60

61

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSISTARIFF REGUL ATION

Tariff policy

Tariffs for technological connection and 
electricity transmission services over 
UNEG are regulated by the federal gov-
ernment and are approved by the Federal 
Tariff Service (FTS) of Russia. Transmis-
sion services provided over distribution 
grids are regulated on the regional level.

A

B

C

D

E

F

БАМ и Транссиб

БРЭЛЛ

Развитие магистральных сетей

Реновация

СВМ

Технологическое присоединение

Tariffs for electricity transmission via UNEG

Прочие

H

G

Программы общегосударственного значения

I

Энергоснабжение южного федерального округа

101,7

/

18%

33,8

32,1

/

/

6%

 6%

108,1

/

19%

48,6

/

9%

122,2

/

22%

23,9

48,3

45,0

/

/

/

4%

8%

8%

Since 2010, tariffs for Federal Grid’s elec-
tricity transmission services over UNEG 
have been set using a method based on 
return on invested capital (“RAB regula-
tion”).

In order to calculate tariffs for each year of 
the regulatory period, the required gross 
revenue is determined by summing the fol-
lowing: recovery of invested capital, return 

on invested capital and expenses required 
to provide power transmission services via 
UNEG. In order to avoid any sharp increas-
es in tariff rates, the RAB-based method 
includes a smoothing mechanism, which 
involves redistributing the required gross 
revenue over the whole long-term period 
under regulation. For the purposes of tariff 
calculation, the invested capital payback 
period is set at 35 years. 

Under the FTS’s tariff policy, Federal Grid 
must maintain the level of reliability and 
quality of service indicators. Indicators of 
reliability of electricity transmission are re-
lated primarily to the occurrence of process 
disturbances and their consequences for the 
consumers, whereas indicators of quality of 
service provided to consumers are related 
primarily with the timeliness of sending 
technological connection agreements.

Tariff rates for electricity transmission services 
to maintain electric grid facilities of UNEG

H

G

Period

I

First long-term regulation period
A

2010

01.01.2011-31.03.2011

01.04.2011-30.06.2012

01.07.2012-30.06.2013

%

01.07.2013-30.06.2014

B

C

F

01.07.2014-31.12.2014

Second long-term regulation period

D
01.01.2015-30.06.2015

E

01.07.2015-30.06.2016

01.07.2016-30.06.2017

01.07.2017-30.06.2018

01.07.2018-30.06.2019

01.07.2019-31.12.2019

For all Russian region excluding the North Caucasus 
Federal District

For Russian regions in the North Caucasus Federal 
District

RUB/MW per month

growth rate 

RUB/MW per month

growth rate 

51.1%

32.9%

- 4.9%
Программа НИОКР

37,845.23

46,029.88

43,783.55

11.0%

Комплексные пилотные проекты создания
активно-адаптивной сети с применением инно-
вационных технологий и энергоэффективность

53,119.60

9.4%

48,540.01

- 0.3%

52,923.13

-

21.6%

419,4

2 598,8

/

/

14%

- 4.9%

84%

10.9%

9.4%

- 0.4%

B

C

%

A

Создание учебных центров подготовки 
производственного персонала ФСК
0%

52,923.13

76,6

/

2%

7.5%

5.5%

4.5%

4.5%

4.5%

56,868.70

59,998.32

62,697.48

65,516.20

68,472.32

0%

7.5%

5.5%

4.5%

4.5%

4.5%

87,868.77

116,782.52

111,083.35
A

123,328.44
B
134,964.06

134,589.17

C
134,589.17

144,686.52

152,648.99

159,516.24

166,687.69

174,208.71

Tariffs for electricity transmission 

Динамика объема финансирования НИОКР, млн руб.

Выручка, млн руб.

via distribution grid facilities

Полная себестоимость, млн руб.

Key long-term parameters for Federal Grid’s RAB regulation approved 
by the FTS of Russia

2.9

3,0

First long-term regulation period

Rate of return on capital invested before 01.01.2010

Rate of return on capital invested after 01.01.2010

2,0

1,0

0,0

1.9

1.7

1.0

2010

2011

3.9%

5.2%

2010 

2011 

11.0%

2012 

2013 

11.0%

2012

0.4
6.5%

2014
11.0%

2013

2014

7.8%

10.0%

10.0%

10.0%

111,085

2010 

Capital invested by Federal Grid, RUB billion

647.6

-

-

-

-

Indicator for reliability of services provided

Indicator for quality of services provided

-

-

0.049

0.0483

0.0475

0.0468

1.2599

1.241

1.2224

1.204

Second long-term regulation period

Rate of return on capital invested

Base level of operating expenses, RUB billion

Динамика структуры активов, млн руб.

2015

2016

2017

2018

2019

10%

35,02

10%

10%

1,214,291

10%

1,231,217

10%

-
1,122,995

-

-

3%

-

3%

Index of operating expenses efficiency

-

1,037,493

3%

3%

Net working capital, RUB billion

902,110

11,42

11,92

12,43

12,97

13,52

Indicator for reliability of services provided

0,03602

0,03548

0,03495

0,03443

0,03391

Indicator for quality of services provided

1,23908

1,22049

1,20219

1,18415

1,16639

In accordance with Government Resolution 
No. 1045 dated 12 December 2009, differ-
ential tariff rates were set for electricity 

transmission services to maintain electric 
2011
2010
grid facilities of UNEG for regions of the 
North Caucasus Federal District of Russia.

Fixed assets

Advances on 
non-current assets
62

2012

2013

2014

2013 

2014 

2015

Work in progress

Long-term financial i
nvestments

Current assets

155,352

168,941
Federal Grid’s services to transmit elec-
tricity over distribution grids are provided 
with the use of their facilities built under 
138,137
the Federal Grid’s investment programme 
by the State-owned company Olimpstroy 
and other distribution grid facilities that 
were leased or provided for use without 

138,836

50

0

Чистая прибыль (убыток), млн руб.

compensation by Federal Grid in accord-
ance the requirements of the relevant 
Resolutions of the Russian Government.
57,082

in 2015 shall be RUB1,780.5 million in the 
Krasnodar Krai and RUB33.2 million in the 
Primorskiy Krai.

In accordance with the decisions of 
regional authorities, the required gross 
revenue of the distribution grids’ facilities 

5,137

92,900

82,501

132,948

140,259

116,510

2011 

Tariffs for technological connection

2012 

2013 

2014

2010 

50

2011 

2012 

2013 

2014

2010 

2011 

2012

2013

2014

The FTS of Russia established a procedure 
for applying two calculation methods for 
technological connection: approval of an 
individual fee for a particular applicant and 
a formula calculation based on standard 
tariff rate R1.

Standard tariff rate R1 has been set on the 
same level for consumers in all regions of 
the Russian Federation irrespective of the 
level of capacity connected or the voltage 
level.

-24,532

-2,468

-25,898
In 2014, payments for technological 
connection under individual projects 
was used in settlements with 25 
consumers. The total level of such 
payments was RUB34.4 billion (ex 
VAT). Applicants with the largest 
payment amounts include:

Размер стандартизированной 
Standard tariff rate R1 
ставки С1 в 2013-2015 гг., 
in 2013-2014, RUB/kW 
руб./кВт (без НДС)
(ex VAT)

27.56

27.56

28.61

Диаграмма динамика долгового портфеля ОАО «ФСК ЕЭС», млрд руб.

300

250

200

1050

Starting from 6 December 2013, payments 
for technological connection of generation 
facilities to UNEG, in addition to expens-
es relating to construction of new grid 
facilities include investment costs relating 
to expanding the existing grid infrastruc-
ture for the delivery of generation capacity 
(irrespective of the generation type).

56.0

100

50

0

2010 

Bonds 

63

RUB
14.2 bn

RUB
10.7 bn

RUB
1.49 bn

RUB
1.45 bn

RUB
1.1 bn

RUB
2011 
1 bn.
Bank loans 

JSC Boguchanskaya HPP

17.5
35.0

JSC Rosenergoatom –
Leningradskaya NPP-2, 
block No 1
JSC Fortum -
Nyaganskaya HPP, 
Block No 1
JSC OGK-2 – 
Chererepovetskaya HPP, 
Block No 4
160.0
LUKOIL-
Astrakhanenergo LLC
JSC Fortum – 
2012 
Nyaganskaya HPP, 
Block No 2

Eurobonds 

25.0

105.0

100.0

17.5

164.8

100.0

17.5

140.3

2013 

2014

Infra structure bonds

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSISA

B

C

D

E

F

G

H

I

БАМ и Транссиб

БРЭЛЛ

Развитие магистральных сетей

Реновация

СВМ

Прочие

Технологическое присоединение

Программы общегосударственного значения

Энергоснабжение южного федерального округа

101,7

/

18%

33,8

32,1

/

/

6%

 6%

108,1

/

19%

48,6

/

9%

122,2

/

22%

23,9

48,3

45,0

/

/

/

4%

8%

8%

I

H

A

G

F

B

C

D

%

E

Программа НИОКР

A

B

Комплексные пилотные проекты создания

2 598,8

84%

активно-адаптивной сети с применением инно-

вационных технологий и энергоэффективность

419,4

14%

/

/

C

Создание учебных центров подготовки 

76,6

/

2%

производственного персонала ФСК

B

C

%

A

DEBT PORTFOLIO

CREDIT R ATINGS

Динамика объема финансирования НИОКР, млн руб.

Выручка, млн руб.

3,0

2,0

1,0

0,0

2.9

1.9

1.7

1.0

0.4

2010 

2011 

2012 

2013 

2014

138,137

138,836

111,085

168,941

155,352

50

0

2010 

2011 

2012 

2013 

50

2014

Динамика структуры активов, млн руб.

1,214,291

1,231,217

1,122,995

1,037,493

902,110

Размер стандартизированной 

ставки С1 в 2013-2015 гг., 

руб./кВт (без НДС)

27.56

27.56

28.61

2010

2011

2012

2013

2014

2013 

2014 

2015

Fixed assets

Work in progress

Advances on 

non-current assets

Long-term financial i

nvestments

Current assets

Federal Grid’s Debt Portfolio 
as at 31 December 2014

Полная себестоимость, млн руб.

Type of debt

Bond issues

Infrastructure bonds

5,137
Eurobonds

TOTAL

2014

Amount, RUB bn

Time to maturity, years

140.3
132,948

140,259

116,510

92,900

82,501

2010 

2011 

2012

100.0

17.5

257.8

2013

2014

1.5 - 8

32 - 34

4.25

-

Чистая прибыль (убыток), млн руб.

57,082

During 2014, Federal Grid was working 
on reducing its debt portfolio through 
exercising put options under the Compa-
ny’s outstanding bond issues. As a result, 
the debt portfolio decreased compared 
to the previous year by RUB24.6 billion 
to RUB257.8 billion. In case of financing 
requirements and positive market trends, 
the Company can place a repurchased 
portion of the bond issues through a 
secondary bond placement. The Com-
pany meets its obligations on servicing 
its debt portfolio and debt repayment 
in full and on time.

2012 

2011 

2010 

2013 

-2,468

Federal Grid’s local bonds are listed on 
the MICEX and its Eurobonds are traded 
at the Irish Stock Exchange.

-24,532

-25,898

In addition, the Company has revolving 
and non-revolving credit facilities opened 
with major Russian banks (Sberbank 
of Russia, Gazprombank, Alfa-Bank, 
NOMOS-Bank, Promsvyazbank, AB 
Russia and Bank Saint Petersburg) with 
maturities of 5–15 years.

In 2015, we expect to exercise put 
options for the total amount of RUB 25 
billion under the following bond series: 
exchanged-traded bonds of BO-01 series, 
bonds of 10 and 07 series). 

Диаграмма динамика долгового портфеля ОАО «ФСК ЕЭС», млрд руб.

300

Federal Grid’s debt portfolio, 
RUB billion

250

200

1050

100

50

0

25.0

105.0

56.0

17.5
35.0

160.0

100.0

17.5

164.8

100.0

17.5

140.3

Starting from the first quarter of 2014, 
highly reliable indicators of the Federal 
Grid’s credit quality assigned by interna-
tional rating agencies have been under 
pressure as Russian sovereign ratings 
appeared likely to be downgraded in the 
environment of growing geopolitical risks 
related to the events in Ukraine, slower 
economic growth due to sanctions im-
posed by foreign countries, dramatic fall in 
the international oil prices, weaker nation-
al currency and significantly higher Rouble 
cost of borrowing in the capital markets. 
Despite that, financial position of our Com-
pany remains strong and stable, which is 

confirmed by evaluation of Federal Grid’s 
credit on a stand-alone basis, i.e. without 
factoring in the state support component.

During the period from the end of 2014 
to the time of preparation of the Annual 
Report, rating agencies carried out addi-
tional actions in relation to Federal Grid’s 
ratings, including actions performed as 
part of the procedures on reviewing for 
downgrade the Russia’s sovereign rating.

category under Fitch Ratings’ scale and 
in speculative category under Standard 
& Poor’s and Moody’s scales. It should be 
noted that our Company remains financial-
ly highly stable, the change in its ratings 
is due to lowering of the country ceiling, 
and the assumption made by the agencies’ 
analysts that the likelihood of the Compa-
ny’s receiving state support in the event of 
significant deterioration of its performance 
has decreased.

At the date of preparation of the report, 
Federal Grid’s ratings are in line with the 
sovereign levels and are in investment 

Information on Federal Grid’s credit ratings 

Rating agency

as at 31.12.2014

as at the date of the 
preparation of the 
Annual Report

as at 31.12.2014

as at the date of the 
preparation of the 
Annual Report 

International scale

National scale

ВВВ- / under review 
for downgrade

ВВ+ / outlook: 
negative

ruAAA / under review 
for downgrade

ruAA+ 

Ваа3 / under review 
for downgrade

Ва1 / ВВ+ / outlook: 
negative 

Aaa.ru / under review 
for downgrade

Aa1.ru 

2010 

2011 

2012 

2013 

2014

Bonds 

Bank loans 

Eurobonds 

Infra structure bonds

ВВВ / outlook: 
negative

ВВВ- / ВВ+ / outlook: 
negative

AAA(rus)

AAA(rus)

64

65

PERFORMANCE RESULTS / MANAGEMENT’S DISCUSSION AND ANALYSISSocial responsibility and 
sustainable development 

Long-term sustainability and reliability of Federal 
Grid Company depend on creating favourable 
conditions for HR development and maintaining a 
constructive dialogue with all stakeholders 

T
L
A
E
H
+
G
N

I

N

I

A

R

T

D

N

A

A

D   S

N

H A

F E T Y   +  SOCIAL S

U

P

P

O

R

T

+

C

O

R

P

O
R
A
T
E
C
U
L
T
U

R

E + DIA

OGUE +

L

T

N

E

M

P

O

DEVEL

Infrastructure

Technology

+

+

=

Strategy

Reliability

Governance

+

Cooperation

SUSTAINABLE DE VELOPMENT PRINCIPLES 

Constructive Dialogue   
with Stakeholders 

We consider the sustainable development 
policy to be an effective tool for delivering 
our strategic objectives – rational use 
of resources and ensuring the reliable 
power supply. 

The main principles of the Federal Grid’s 
sustainable development policy are 
maintaining a balance between social 
and economic interests in the Company’s 
activities and focusing on those aspects of 
sustainable development that are of high 
priority for our stakeholders. 

Strategic priorities of Federal Grid’s sustainable 
development 

• Innovative development of 
domestic energy industry 

• Building a talent pool for the 

smart energy system 

• Developing responsible 

human resource 
management practices 

• Health and Safety 

improvement 

• Ecologisation and improving 
energy efficiency of electric 
grids 

• Fair distribution of value 
created and evaluation 
of economic efficiency 
of innovations and new 
technologies 

• Integrating the social 

responsibility strategy into 
internal business processes 

As part of preparing the Social Report, 
the Company discusses its key topic with 
stakeholders and collects disclosure 
requests. Prior to publication, the text 
of the Report is discussed publicly in the 
form of hearings held either in absentia or 
in person. 

Our Social Reports are registered with the 
National Registry of Corporate Non-Fi-
nancial Reports, which is maintained by 
the Russian Union of Industrialists and 
Entrepreneurs. 

Regular, open communication with 
stakeholders plays an important role, as 
it allows us to better understand their 
expectations and to use a target-oriented 
approach for shaping the corporate social 
responsibility agenda. The communication 
channels we use for the dialogue include 
congress and exhibition arrangements, 
multilateral discussions, raising aware-
ness through mass media.

Since 2008, Federal Grid Company has 
published annual reports on social re-
sponsibility and corporate sustainability 
(Social Report). Reports are prepared in 
accordance with international standards 
for non-financial statement disclosure: 
GRI Guidelines, the GRI energy protocol, 
AA 1000 SES standard. 

67

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсонал 
 
 
 
 
 
 
Stakeholder Engagement

Stakeholders

Understanding of Social Responsibility 

Progress in 2014 

The State

Consumers

•  Meeting obligations under the investment 

programme 

•  Ensuring the reliable and uninterrupted power 

•  Signing several cooperation agreements with public 

supply 

authorities (Rosreestr, regional agencies) 

•  Implementing priority public sector projects 

•  Drafting, approving and implementing the import 

•  Transparency and efficiency of operations, meeting 

with the needs of the economy 

substitution programme 

•  Creating and arranging meetings of the Consumer 

•  Supporting the domestic power plant industry, 

Council

encouraging import substitution 

•  Distributing SPV mechanism to accelerate consumer 

•  Openness and flexibility in consumer relations 

access to UNEG 

Shareholders and Investors

•  Transparency of business processes 

•  Growth in shareholder value 

•  Signing cooperation agreements with Rosneft, RZD 

and other companies 

•  Holding General Meeting of Shareholders 

•  Arranging meetings of Federal Grid’s senior 

executives with analysts from investment banks and 
funds, rating agencies 

•  Holding consultation meetings with minority 

shareholders – individuals 

Employees

•  Taking measures for attracting and retaining young 

•  Creating decent working conditions 

specialists 

•  Health and Safety 

•  Implementing a Corporate Housing Programme 

•  Providing opportunities for professional and personal 

•  Doors Open Days 

growth 

•  Social support 

•  Holding professional skill competitions 

•  Ensuring professional training, including within the “ 

Knowledge Days” 

Suppliers and Contractors

Local Communities and 
Environmental Team

Science and Education 

Mass Media 

•  Creating transparent competitive environment 

manufacturers 

•  Signing agreements with Russian and foreign 

•  Using a market based pricing model 

•  Supporting domestic suppliers in access to foreign 

markets

•  Reducing negative impact on the environment 

•  Signing a first (among electric power companies) 
cooperation agreement with the World Wildlife 
Fund (WWF) on conservation of oriental storks and 
prevention of bird death on power lines 

•  Participation in Earth Day 

•  Promoting industry-specific science and education 

•  Cooperating with scientific organisations, placing 

•  Personnel training and ensuring generational 

continuity 

•  Applying innovative technologies that reduce 

orders for R&D 

•  Organising practical training, Days of Federal Grid 

Company in education institutions 

environmental impact 

•  Organising students’ teams 

•  Transparency of business processes 

•  Ensuring information accessibility of the Company’s 

activities 

•  Holding media events (briefings, press-points, and 

others)

•  Distributing press releases on a timely basis 

•  Handling requests from mass media 

68

HR POLICY

Developing Human Capital

Our employees are those who ensure 
a reliable operation of UNEG facilities. 
Our objective is to create and sustain 
conditions for optimal use of workforce 
capacity and to ensure the availability 
of qualified personnel with the mini-
mum level of employee turnover.

Federal Grid’s HR Policy aims to in-
crease productivity, strengthen social 
protection of employees, create fa-
vourable social climate and ensure that 
employees and other stakeholders have 
a positive perception of the Company’s 
image.

young specialists. For example, the 
Company compensates them rental 
cost and provide corporate housing 
for young specialists in remote 
regions.”

Professional competency of 
employees is one of the key 
components of the formula 
for reliability of Federal Grid 
Company. What efforts does 
the Company make to attract 
young talent under conditions 
of manpower shortage in the 
market?

“To attract the best graduates, 
to help them with adaptation and 
to increase their interest in a 
long-term development within the 
Company, we implement a number 
of projects, from engagement with 
higher-education institutions and 
specialised secondary schools 
to social programmes for young 
specialists. 

Federal Grid develops close 
relationship with industry-specific 
education institutions. Today, 
cooperation agreements are in force 
with 50 higher-education institutions 
of our country and 13 specialised 
secondary schools. The main areas 

of cooperation are improving the 
structure and content of educational 
programmes for power engineers, 
developing topics for graduation 
works and thesis researches 
for students and postgraduates, 
organising the traditional annual 
Day of Federal Grid Company in 
education institutions, practical and 
pre-graduation practical training for 
students, training for teaching staff 
at the Federal Grid facilities. 

In the reporting year, more than 
640 students undertook practical 
and pre-graduation training at 
the Federal Grid’s facilities. The 
Company hires more than 400 
graduates of higher-education 
institutions annually. 

Federal Grid has a number of 
social programmes targeted at 

Natalia Ozhegina 
Deputy Chairman of the 
Management Board of 
Federal Grid Company 

69

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / SUSTAINABLE DEVELOPMENT PRINCIPLESДинамика списочной численности персонала ФСК 

Уровень обеспеченности ФСК персоналом

A

B

C

D

E

F

G

H

I

MES Siberia

MES Ural

MES South

MES North-West

MES Volga

MES Western Siberia

MES East

Executive Office

MES Centre

16%

11%

11%

11%

9%

8%

8%

4%

22%

A

B

C

I

F

%

H

G

E

D

98.2%

97.0%

96.7%

95.6%

95.0%

2010 

2011 

2012 

2013 

2014

25,741

25,103

24,603

24,518

26 000

25 000

24 000

22 000

21 000

20 000

23 000

22,513

2010 

2011 

2012 

2013 

2014

Структура персонала
по уровню образования

Headcount and Personnel Structure 

Динамика списочной численности персонала ФСК 

Динамика списочной численности персонала ФСК 

At the end of 2014, the headcount of Fed-
eral Grid Company was 24,518 employ-
ees, a 5% decrease on 2013. Headcount 
optimisation was made under the policy 
for increasing productivity that involves 
a 10% decrease in the number of ad-
ministrative and managerial personnel 
compared with 2013 figures. 

2014 Employee Headcount 
by Branch 
MES Siberia

16%

MES Ural

11%

A

B

I

A

I
Динамика списочной численности персонала ФСК 

MES South

11%

MES Siberia

16%

A

C

B

C

D

E

F

D

E

F

G

H

MES Ural
MES North-West
MES South

MES Volga

25,741

MES North-West
MES Western Siberia
24,603
MES Volga
MES East

25,103

MES Western Siberia

Executive Office

26 000

25 000

24 000

23 000

H

G

H

G
F

11%

11%

11%

11%

9%

8%

24,518
8%

9%

4%

22%

8%

8%

4%

E

F

Employees by 
Educational Level 

Уровень обеспеченности ФСК персоналом

0.1%
0.4%
7.7%

0.1%
0.4%
7.2%

Структура персонала по возрасту

0.1%
0.4%
5.5%

Структура персонала по категориям

Уровень обеспеченности ФСК персоналом

98.2%
33.1%

100%

90%

80%

33.0%

9.4%

33.1%

10.3%

58.7

59.3

60.9

B

A
100%

80%

60%

40%

20%
C

0%

%

%

B

A

B

D

C

D

16%

11%

11%

C
 2012 
D

E

F

G

H

16.4%

42.1%

MES Siberia

42.4%
MES Ural

MES South

95.6%

16.3%

42.9%

16%

95.0%

95.6%

11%

40.8%

11%

95.0%

MES North-West

2013 
2010 

11%

2011 

Workes 

MES Volga

Higher professional education
Professional Employees 
2010 
Candidate's Degree
A

9%

8%

2011 

MES Western Siberia
I
MES East

Executive Office

8%

4%

G

F

97.0%

16.0%

97.0%

40.7%
I
43.3%

98.2%

70%

96.7%

60%

58.7%
A

59.3%

50%
96.7%
40%

30%

20%

Уровень обеспеченности ФСК персоналом

66.3%

65.6%

60.9%

2012 

2014
H
Management

2013 
Уровень обеспеченности ФСК персоналом
Secondary general education
 2012 

2.8%

2014

0%

Secondary vocational education

2013 

2012

%

B

10%

2013

22.2%

2014
95.6%

2012 

Doctor's Degree

2013 

2014

C

20.8%

2.5%

95.0%

97.0%

2014

22.1%

1.8%

96.7%

2012 

2013 

2014

Working Pensioners

98.2%

25 -50

97.0%

2010 

50 - Pension Age

Under 25

2011 
96.7%

2012 

2013 

2014

Среднее профессиональное образование
H

Material incentives 

Динамика списочной численности персонала ФСК 

22%
B
95.6%
Ученая степень кандидата наук

MES Centre

11%

I

%

E

D

2010 

2011 

2012 

2013 

2014

Динамика списочной численности персонала ФСК 

MES East

MES Centre

I

Dynamics of Employee 
Headcount 

G
22,513
H

Executive Office

25,741

22 000

I

MES Centre

E
MES Siberia
Уровень обеспеченности ФСК персоналом
MES Ural

22%

B

A

25,103

24,603

A

21 000

24,518

20 000

Stuff Sufficiency 
2011 
2010 

2012 

2013 

2014

C

D

E
97.0%
F

MES South

98.2%
MES North-West

MES Volga

MES Western Siberia
96.7%
30%

95.6%

Структура персонала по возрасту
MES East

G

H
Executive Office
16%
I
95.0%
Структура персонала по возрасту
I
11%

MES Centre

10.3%

9.4%

A

20%

10%

0%

10.1%

22%

66.7%

100%

11%

9%
33.1
8%

8%

4%

33.0
G

F

Структура персонала по категориям

2010 

2011 

F
Структура персонала по категориям

%

B

C
2012 

2013 

A

B
2014
C

D

D

16.3%

16.0%

16.3%
E
E
In the second half of the reporting year, 
42.9%
F
a project was launched for auditing and 
improving the functional organisational 
G
structure of the Company, which is expect-
ed to result in a 15% reduction of adminis-
43.3%
trative and managerial staff. 
2014

43.3%

40.7%

42.9%

40.7%

16.0%

40.8%

H

40.8%

I

MES Siberia
100%

MES Ural

90%

80%
MES South
70%

90%
MES North-West
2010 
80%

60%

MES Volga

50%
MES Western Siberia
40%

70%

Professional Employees 
2013 

Professional Employees 

Management
The employee turnover rate decreased 
2014
by 1.3% to 6.5% compared with 2013. In 
2014, 3,152 employees were hired and 
4,415 employees were fired by Federal Grid 
Company.

Management

Структура персонала по категориям

100%

80%

60%

40%

20%

0%

9.4%

11%
2011 

65.6%

2012 
H

9%

8%

G

66.3%

10.3%

2013 

%

66.3%

10.1%

B
2014
2014
Среднее общее образование

66.7%

2012 

2013 

30%

MES East

Employees by Category

60%
65.6%
Структура персонала по категориям
50%
40%
Executive Office
30%

22.2%

8%

4%

20%

F
16.3%

16.4%

10%
MES Centre
0%

20.8%
E
2.5%

D

7.7

8%
C

7%

22.1%

20%

22%

16.0%
6%
Структура персонала по возрасту
0%
40.7%
2014
5%
Динамика списочной численности персонала ФСК 
43.3%

42.9%
2013 

 2012 

20.8%

22.2%

42.1%

22.1%

2012 

2013 

2.8%

2.8%

1.8%

1.8%

2014

10%

50%

40%

5.5

0%

7.2

100%

90%

80%

70%

30%

20%
2010 
10%

40%

30%

60%

Succession pool

20%

2011 
65.6%

0,5%

95.0%

33.1

Уровень обеспеченности ФСК персоналом

Высшее профессиональное образование
0.4

Динамика списочной численности персонала ФСК 

0.4

0.4

0,4%
C

Высшее профессиональное образование
2010 

98.2%

E

D

70%

0,2%

A compensation system in Federal Grid 
Company takes into account the position 
categories, performance results of the 
Company branches and structural divi-
sions, specifics of regional labour mar-
kets and individual contribution of each 
50%
59.3
employee.
95.6%
40%

70%

58.7

59.3

60%

97.0%

60%
Структура персонала по возрасту
50%

0%
2014
58.7
Ученая степень доктора наук

2012 

95.0%

2011 

To retain a certain income level of key 
personnel, the Company provides wage 
indexation for employees under “workers” 
80,000
category by the value of actual growth 
in the consumer price index in accord-
60,000
ance with the provisions of the Electricity 
60.9
Industry Tariff Agreement. Over the period 
40,000
of 2010-2014, the average wage level has 
increased almost by 27% up to RUB64 
thousand. 

20,000

96.7%

2013 

0.1

0.1

10.1%

10.3%

60.9

9.4%

0,1%

0.1

Динамика средней заработной платы работников ФСК 

Employee Average Wage/
Salary, RUB 
2013 

2014

2012 

Динамика списочной численности персонала ФСК 

64,091
Высшее профессиональное образование
53,078 58,032

62,042

50,512

70%

60%

58.7

59.3

60.9

2012 

66.3%

2013 

Динамика списочной численности персонала ФСК 
2013 

50%
2011 

2012 

2010 

0

66.7%

2014

Высшее профессиональное образование

40%

2014

B

Динамика списочной численности персонала ФСК 

22 000

25,103

24,603

25,741

24,518

25,103

24,603

24,518

Динамика списочной численности персонала ФСК 

2010 

2011 

2012 

2013 

26 000
2014

25 000

24 000
I
23 000

22,513

23 000

22,513

26 000

E

MES Volga

21 000

20 000

25,741

26 000

25 000

26 000

24 000

25 000

23 000

24 000

22 000

23 000

21 000

22 000

20 000

21 000

20 000

22,513

22,513

A

B

C

D

F

G

H

25 000

24 000

23 000

I

22 000

21 000

20 000

MES Siberia

MES Ural

MES South

MES North-West

MES Western Siberia

25,103

24,603

MES East

100%

Executive Office

80%

MES Centre

22,513

60%

40%

20%

0%

100%

80%

60%

40%

20%

16%

11%

11%

11%

25,741

9%

H

G

24,518

8%

8%

4%

16.4%

22%

42.1%

16.4%

42.4%

42.1%

2010 

0%

2011 

2012 

2013 

2014

Workes 

 2012 

Workes 

9.4%

33.1

33.0

33.1

33.1

33.1

65.6%

33.0

2012 

2013 

16.4%

22.2%

2014

Среднее общее образование

42.1%

60%

0%

2.8%

0%

 2012 

2012 

2013 

2014

2013 

Среднее общее образование

Working Pensioners

42.4%

7.7

7.2

25 -50

7.7

 2012 

100%

90%

80%

70%

60%

50%

30%

40%

30%

20%

20%

10%

10%

8%

7%

6%

5%

30%

20%

10%

100%

0%

80%

40%

8%

20%

0%

7%

6%

5%

Среднее профессиональное образование

2012 

2013 

2014

26 000

25 000

24 000

22 000

21 000

20 000

25,741

25,103

24,603

24,518

2010 

2011 

2012 

2013 

2014

100%

80%

60%

40%

20%

0%

Структура персонала по категориям

16.4%

42.1%

42.4%

16.3%

42.9%

40.8%

16.0%

40.7%

43.3%

 2012 

2013 

2014

Workes 

Professional Employees 

Management

Среднее профессиональное образование

30%

20%

10%

0%

8%

7%

6%

5%

2012 

2013 

2014

Среднее общее образование

7.7

7.2

5.5

0,4%

0,2%

0%

0,1%

0,5%

0%

Структура персонала по возрасту

Среднее профессиональное образование
10.3%

80%

Среднее профессиональное образование

40%

Структура персонала по категориям

 2012 

42.4%

2013 

100%
Working Pensioners
Высшее профессиональное образование
 2012 
90%
25 -50
80%

2.5%
50 - Pension Age
2013 
Under 25

42.4%

40.8%

 2012 

Working Pensioners

2013 

50 - Pension Age

2014

70%

25 -50

70%
Under 25
60%

2014

9.4%

100%

66.3%

60%

20%

0%

20.8%

16.3%

2.5%

42.9%

0.4

0.4

60%

59.3

50%

60.9

58.7

10.1%

16.3%

42.9%

16.4%

42.1%

66.7%

16.0%

40.7%

Workes 

Professional Employees 

0.4
Ученая степень кандидата наук
42.4%

Over the last few years, a tendency has 
been observed towards a decrease in 
Ученая степень кандидата наук
average age of the Company employees. 
During the period from 2012 to 2014, the 
average age has decreased from 39.6 to 
0,4%
39.3 years. The majority of the Company’s 
staff (57%) are employees of the age below 
0.4
Среднее профессиональное образование
2013 
2014
10.1%
0,2%
40 years. Thus, the Company has achieved 
Ученая степень кандидата наук
Динамика средней заработной платы работников ФСК 
80,000
an optimal balance of young, enthusias-
66.7%
 2012 
Workes 
Management
tic employees and experienced, highly 
A
0%
qualified staff members who ensure the 
30%
2014
continuity of generations and the transfer 
Ученая степень доктора наук
of professional knowledge and skills. 
20%
2012 

Динамика средней заработной платы работников ФСК 
10.3%

40%
Структура персонала по возрасту
30%
20%

43.3%
Employees by Age

0.4
Working Pensioners

53,078 58,032

53,078 58,032

Professional Employees 

62,042
66.3%
0,4%

33.1
50,512
65.6%

Management

33.0
60,000

 2012 

16.0%
2012 

62,042

64,091

64,091

80,000

60,000

40,000

22.1%

40.7%

40.8%

22.2%

65.6%

2014

2013 

2013 

9.4%

1.8%

2.8%

0,4%

0,2%

0,2%

25 -50

33.1

30%

20%

10%

40%

100%

50%

10%

60%

50%

40%

80%

70%

90%

0%

0%

0.4

0.4

0.4

0.4

0%

B

C

20,000

2012 
40,000

50,512
2013 

2014

2014
0.1
Ученая степень доктора наук

Среднее профессиональное образование
40.8%
50 - Pension Age
Under 25

43.3%
0.1

0,1%

10%

0.1

30%

20%

0

0.1

0%

10%

Ученая степень кандидата наук
2012 
2012 

22.2%
2010 
2014
2.8%
0.4
Среднее общее образование

20,000

2011 

0%

0,4%

2013 
0.4
0
 2012 

0.4
2013 

2011 

0%
20.8%
2013 

2.5%

2010 

2012 

2013 

22.1%

2014

2012 

2014
Ученая степень доктора наук

2013 

1.8%

2013 

7.2

Workes 

5.5

Professional Employees 

30%

2014
0,1%

0,5%

33.1

33.0
Management

0.1

0.1

33.1

10%

0%

2012 

2013 

2014

2012 

2013 

70%

2014

0%

60%

2013 

2012 

10.1%

2014
20.8%

22.2%
66.7%
2.8%

Two types of succession pool have been 
created in Federal Grid Company: “tacti-
cal” and a pool for the position of PMES’ 
director. 
Динамика списочной численности персонала ФСК 
A tactical succession pool for the pro-
duction and technical facilities of Federal 
Высшее профессиональное образование
Grid - MES (backbone electric grids),was 
created under five key areas of the Com-
70%

pany’s activities for the positions of heads 
and deputy heads of structural units of the 
Company branches. In order to develop 
the professional competencies of the 
succession pool members, a mentorship 
programme was launched which required 
each member to complete his individual 
training plan under the supervision of his 
mentor within nine months. 

Working Pensioners

50 - Pension Age

58.7
22.1%

 2012 

Under 25

2013 

2014

2.5%

1.8%

25 -50

59.3

50%

40%

30%

20%

22.1%

59.3

60.9

10%

30%
10.3%
20%

10%
66.3%
0%

20.8%

2.5%

58.7

60%
Appointments of succession pool members to superior positions in 2014 
50%

1.8%

0%

A
2012 

2013 

2014

37%

30%

60.9

20%

A succession pool for the position of PMES’ 
Director was created to minimise HR risks 
related to professional level of directors 
of PMESs (backbone electric grid enter-
prises).

10%

0%

2012 

2013 

2014

2013 

2014
Professional employees
50 - Pension Age
Management
Under 25
Workers

A

B

C

Professional employees

40%
Динамика средней заработной платы работников ФСК 
A
30%

C %

37%

43%

20%

Management

20%

C %

64,091

Workers
20%

43%

80,000
Type of succession pool 
60,000
Tactical succession pool for the production and technical facilities of Federal Grid – MES 
40,000
Succession pool for the position of PMES’ Director
2013 
20,000

53,078 58,032

50,512

62,042

2012 

2014

B

10%

0%

B

2014
2014
Динамика средней заработной платы работников ФСК 
0.1

0.1

0.1

0,5%

0%

80,000

60,000

40,000

2012 

20,000

A

50,512

0

53,078 58,032

Распределение прошедших в 2014 году  
обучение работников ФСК по категориям

2012 
A

62,042

64,091

2010 

2011 

2013 

2014

Professional employees

Распределение прошедших в 2014 году  
обучение работников ФСК по категориям

C

Workers

B

Management

37%
71
20%

43%

C %

Number of members 
appointed to superior 
positions, persons 

Number of 
members 
in 2014, 
persons 

A

B

C

Professional employees

Target 
positions

Management
412

Workers
92

25

2

Sufficiency 
of 
succession 
pool for 
managerial 
positions 

108%

162%

C %

others
37%

20%

15

43%

8

A

33.1

33.0

33.1

0.4

0.4

0.4

Ученая степень кандидата наук

2012 

2013 

2014

5.5

20%

10%

0,5%

0%

0%

2012 

2013 

8%
2014

7%

Динамика средней заработной платы работников ФСК 

0%

2012 

2013 

2014
Среднее общее образование

2013 
Ученая степень кандидата наук

2012 

2014

6%

5%

7.7
0,2%

0%

70

5.5

2012 

2014
Ученая степень доктора наук

2013 

Working Pensioners

7.2

25 -50

50 - Pension Age

0,1%

Under 25

2012 

2013 

2014

Ученая степень доктора наук

0.1

0.1

0.1

33.1

33.0

33.1

53,078 58,032

64,091

62,042

8%

0,4%

0.4

7.7

50,512

2012 

2013 

2014

Professional employees

Management

0,1%

Workers

37%

0.1

20%

43%

0.1

0.1

Динамика средней заработной платы работников ФСК 

0

2013 

2014

2010 

2011 

2012 

2013 

2014

0.4

7.2

A

0.4

B

C

5.5

Распределение прошедших в 2014 году  

обучение работников ФСК по категориям

B

C %

62,042

64,091

B

50,512

2012 

53,078 58,032

2013 

2014

0,5%

80,000

0%

60,000

40,000

20,000

0

A

B

C

Professional employees

37%

Management

Workers

20%

43%

A

C %

Распределение прошедших в 2014 году  

обучение работников ФСК по категориям

2012 

2013 

2014

2012 

2013 

2014

7.2

Среднее общее образование

Ученая степень доктора наук

2013 

2010 

2014

2011 

2012 

2013 

2014

2012 

2012 

2013 

2013 

2014

2014

0.1

0.1

0.1

80,000

60,000

40,000

20,000

0

2012 

7.7

30%

20%

10%

0%

8%

7%

6%

5%

7%

6%

0,2%

5%

0%

0,1%

0,5%

0%

5.5

Распределение прошедших в 2014 году  

обучение работников ФСК по категориям

2010 

2011 

2012 

2013 

2014

B

2012 

2013 

2014

2012 

2013 

2014

Распределение прошедших в 2014 году  

обучение работников ФСК по категориям

Динамика списочной численности персонала ФСК 

Высшее профессиональное образование

10.1%

66.7%

98.2%

70%

60%

50%

40%

30%

20%

10%

0%

A

B

C

Professional employees

37%

Management

Workers

20%

43%

A

C %

Распределение прошедших в 2014 году  

обучение работников ФСК по категориям

A

B

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / HR POLICYДинамика списочной численности персонала ФСК 

Уровень обеспеченности ФСК персоналом

25,741

25,103

24,603

24,518

26 000

25 000

24 000

22 000

21 000

20 000

23 000

22,513

2010 

2011 

2012 

2013 

2014

Динамика списочной численности персонала ФСК 

25,741

MES Siberia

MES Ural

MES South

MES North-West

25,103

MES Volga

24,603

MES Western Siberia

MES East

Executive Office

MES Centre

16%

11%

11%

11%

8%

8%

4%

22%

9%

24,518

A

B

C

D

E

F

G

H

I

26 000

25 000

24 000

22 000

21 000

20 000

23 000

22,513

2010 

2011 

2012 

2013 

2014

A

B

C

I

F

%

H

G

E

D

A

B

C

D

E

F

G

H

I

MES Siberia

MES Ural

MES South

95.6%

MES North-West

MES Volga

MES Western Siberia

MES East

Executive Office

MES Centre

16%

11%

11%

11%

9%

8%

8%

4%

22%

95.0%

H

G

98.2%

97.0%

I

A

96.7%

%

B

C

F

E

D

2010 

2011 

2012 

2013 

2014

95.6%

95.0%

Уровень обеспеченности ФСК персоналом

98.2%

97.0%

96.7%

2010 

2011 

2012 

2013 

2014

100%

80%

60%

40%

20%

0%

Структура персонала по категориям

16.4%

42.1%

42.4%

16.3%

42.9%

40.8%

16.0%

40.7%

43.3%

 2012 

2013 

2014

Workes 

Professional Employees 

Management

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

100%

80%

60%

40%

20%

0%

Структура персонала по возрасту

10.3%

66.3%

10.1%

66.7%

Структура персонала по категориям

16.4%

42.1%

42.4%

 2012 

16.3%

42.9%

20.8%

2.5%

40.8%

2013 

16.0%

40.7%

43.3%

2014

22.1%

1.8%

 2012 

Working Pensioners

2013 

25 -50

50 - Pension Age

2014

Under 25

Workes 

Professional Employees 

Management

9.4%

65.6%

22.2%

2.8%

Среднее профессиональное образование

Ученая степень кандидата наук

Динамика списочной численности персонала ФСК 

Высшее профессиональное образование

70%

60%

50%

40%

30%

20%

10%

0%

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

Структура персонала по возрасту

59.3

60.9

58.7

9.4%

65.6%

10.3%

66.3%

2012 

22.2%

2.8%

2013 

2014

20.8%

2.5%

 2012 

2013 

2014

Working Pensioners

50 - Pension Age

25 -50

Under 25

10.1%

66.7%

22.1%

1.8%

Динамика списочной численности персонала ФСК 

Высшее профессиональное образование

58.7

59.3

60.9

70%

60%

50%

40%

30%

20%

10%

0%

2012 

2013 

2014

33.1

33.0

33.1

0.4

0.4

0.4
Среднее профессиональное образование

Personnel Training and Development 

Динамика средней заработной платы работников ФСК 

Ученая степень кандидата наук

2013 

2014
10%
Ученая степень доктора наук
0%
0.1

0.1

33.1

33.1

33.0
80,000

20%

30%

Having personnel with a high level of 
professional qualification is one of the key 
factors driving the reliable operation of 
UNEG. In this context, issues of devel-
oping a comprehensive and continuous 
system of personnel training become a 
high priority. 

50,512

60,000

40,000

2014
Среднее общее образование
2010 

20,000
2013 
0

0.4

0.4

0.4

0,4%

64,091

In 2014, 15,440 employees, 62% of total 
headcount, were involved in various types 
62,042
53,078 58,032
of training, retraining and profession-
0,2%
al development. Training of operating 
personnel (12,648 employees) made up 
the largest part of all programmes (82%). 
Since operating personnel are involved in 

operation of hazardous facilities, training 
under the Rostechnadzor’s programmes 
became one of the focus areas in the 
reporting year. 

Professional employees

Management

B

A

C

Workers

80,000

20%

43%

Доля работников ФСК ЕЭС, принявших участие в обучающих мероприятиях,
0%
и соотношение затрат на подготовку персонала к фонду заработной платы в 2014 году

60,000

2012 

2013 

2012 

50,512

53,078 58,032

2014
Ученая степень доктора наук
2013 

2014

2011 

2012 

40,000

C %

64,091

62,042

Динамика средней заработной платы работников ФСК 

37%

A

Employees trained in 2014 
by categories 

A

B

C

Professional employees

37%

Management

Workers

20%

43%

30%

20%

10%

0%

8%

7%

6%

5%

2012 

2013 

2014

Среднее общее образование

7.7

7.2

5.5

0,4%

0,2%

0%

0,1%

0,5%

0%

2012 

0.1

0.1

0.1

0.1

20,000

0

2010 

2011 

2012 

2013 

2014

B

2012 

2013 

2014

2012 

2013 

8%

7%
2014
6%

5%

7.7

7.2

5.5

0,1%

0,5%

0%

2012 

2013 

2014

2012 

2013 

2014

Share of Employees Trained in 2014, and Training Costs/Salary 
Budget Ratio, % 

Распределение прошедших в 2014 году  
обучение работников ФСК по категориям

In 2014, within one of the Company’s stra-
tegic activity areas on creating conditions 
for import substitution development and 
localisation of electrical manufacturing 
in the territory of the Russian Federation, 
the training was organised for the Com-
pany’s specialists at the production sites 
of the largest Russian manufacturers of 
power equipment, such as Energomash 
(Ekaterinburg) – Uralelectrotyazhmash, 
and Tolyattinsky Transformator, Besides, 
the joint corporate training programmes 
were successfully implemented with the 
equipment suppliers Ekra, Energoinno-
vations, Uralenergoservice, Prosoft-sys-
tems, RT Soft, Siemens, Alstom Grid, GE, 
ABB. 

plexes. They include training simulators, 
laboratories with relay protection and 
emergency automatic equipment, and 
electric grid training areas equipped 
Распределение прошедших в 2014 году  
with advanced technical training aids 
обучение работников ФСК по категориям
and prototype equipment. The simulation 
classes are made as scaled-down models 
of dispatch control centres and allow us to 
organise emergency response exercises 
for operators of Grid Control Centres of 
the Company branches. 

specialists. In 2014, 8,755 employees 
participated in the training events held by 
the personnel training centre within this 
project. 

C %

A
Federal Grid Company continues to 
extend the scope of cooperation with the 
leading industry-specific higher edu-
cation institutions in all regions where 
the Company operates. The cooperation 
programme aims to address issues of 
improving education in the power industry 
in order to bring knowledge and skills of 
graduates closer to the current produc-
tion requirements of the Company. Our 
employees were actively involved in the 
institutions’ educational process with 
regard to improving the programmes/
courses for electric power engineering 
and developing topics for early essays 
and graduate theses. Practical training 
for students was ogranised at the Federal 
Grid’s facilities and personnel training 
centres, and the projects Applied Bach-
elor’s Programme and School for Young 
Engineers were implemented. 

B

74.0

57.0

56.0

0.7

0.3

43.0

0.4

22.0

Corporate 
Headquarters

MES
Volga

MES
East

0.5

36.0

MES 
Western 
Siberia

67.0

68.0

69.0

73.0

58.0

0.8

46.0

0.6

0.5

0.6

0.6

24.0

31.0

27.0

21.0

28.0

MES
North-West

MES
Siberia

MES
Ural

MES 
Centre

MES 
South

Share of employees trained, %

Including at the Company’s training centres, % (prior license receipt)

Training costs/salary budget ratio, %

In 2014, 383 employees of Federal Grid 
Company were trained under retraining 
and professional development pro-
grammes at the premises of higher-edu-
cation institutions. Training was provided 
within the cooperation agreements with 
such higher-education institutions as 
National Research University Moscow 
Power Engineering Institute (MPEI), 
St.Petersburg Polytechnic University, 
Samara State Technical University, Ural 
Federal University, Far East State Trans-
port University, Surgut State University, 
and others. Under the federal programme 
“Training and Retraining of Executive Tal-
ent Pool”, one of the Company’s mid-level 
executives received training at Lomon-
osov Moscow State University. The team 
of 10 young specialists from the Federal 
Grid’s succession pool took part in the 3rd 
International Forum “Energy Saving and 
Energy Efficiency” ENES 2014. 

In 2014, active simulator training was 
arranged at Personnel Training Centres, 
287 exercises were organised. 6,700 
employees were trained in the Compa-
ny’s personnel training centres under 
the various professional development 
programmes that take into considera-
tion knowledge, skills and expertise of 
trainees. 

In August 2014, the Federal Grid’s 
Personnel Training Centres moved to a 
new professional level – they received 
a license for educational activity. The 
license increases the Company’s oppor-
tunities and enables not only to train our 
employees, but also to implement serious 
education projects for outside clients. 

In order to build a knowledge manage-
ment system, and taking into account 
the necessity to train a great number of 
employees from the Company branches to 
work with new production, technological 
and management standards, an educa-
tional project “Day of Knowledge” has 
been implemented in Federal Grid Com-
pany since 2011. Day of Knowledge is held 
in the form of video conference, that is the 
most accessible way to get knowledge for 
all employees regardless of their location 
and facilitates the adaptation of young 

In 2014, a special attention was paid to 
training technical specialists from the 
succession pool of Federal Grid Company. 
Practical training at the manufacturers’ 
premises, including foreign manufactur-
ers, became the most significant event. 
A trip to Prague was organised under the 
project on creating a single communica-
tion network for electric power industry, 
where the Company employees were 
trained on the Marconi equipment. 

Since the opening of training centres in 
the Company branches – MES in 2011, an 
internal training system has been formed 
in Federal Grid. It allows us to manage 
the quality of personnel training accord-
ing to the Company’s requirements, to 
update the existing professional develop-
ment programmes and develop new ones, 
to optimise costs and time within the 
training process.

Today, the licensed Personnel Training 
Centres of Federal Grid Company appear 
to be comprehensive educational com-

72

73

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / HR POLICYNon-Governmental Pension Programme

SOCIAL POLICY

Socially Responsible Approach 

Social Programmes for Employees 

A non-governmental pension programme 
for the Company employees was ap-
proved in 2004. Since the programme 
launch, a non-governmental pension 
from Federal Grid funds has been grant-
ed to 4,295 employees. 

Implementing this programme has a 
great motivational effect and allows us 
to provide our employees with decent 
non-governmental pensions. 

In 2014, RUB327 million was allocated 
for the non-governmental pension fund. 

Awards Policy 

Employees are entitled to 
awards if they have rendered 
great service to the State, to 
the fuel and power industry 
or to the Company, and if they 
demonstrate high production 
and management efficiency, 
or achieve great results in the 
operation, construction and 
re-construction of electric grid 
facilities. 

In 2014, awards were given to 
4,981 employees of Federal Grid 
Company, its subsidiaries and 
associates, and contractors, 
including:

75

190

6

4,445

employees 
received State 
awards of the 
Russian Fed-
eration and the 
Government of the 
Russian Federation 
for their services to 
the State, includ-
ing their major 
contribution to the 
construction and 
ensuring reliable 
operation of the 
Olympic electric 
grid facilities in 
Sochi 

employees re-
ceived industry 
awards of the 
Russian Ministry of 
Energy 

employees were 
given the Honou-
rary Certificate of 
the CIS Electric 
Power Council 

employees were 
given corporate 
awards of JSC 
Russian Grids 
and Federal Grid 
Company

Samarskoye 
PMES

MES 
Ural 

was awarded the 
title “Best Enter-
prise of Federal 
Grid Company – 
PMES” in 2014

was awarded the 
title “Best Branch 
of Federal Grid 
Company – MES” 
in 2014 

A benefits package in Federal Grid Company 
is based on a principle of social partnership 
between the employer and employees. It is 
a tool for employee motivation and social 
security and includes voluntary medical insur-
ance, accident insurance, non-governmental 
pension, financial assistance to employees in 
need (connected with marriages, childbirths, 
etc), wage/salary advance. 

The Company has a Corporate Housing 
Programme. To provide qualified personnel 
for power facilities that are in remote areas or 
under construction, a corporate housing stock 
of Federal Grid Company has been created, 
numbering 647 living accommodations. In 
2014, 193 company-owned apartments were 
commissioned and provided for rent to the 
Company employees. Our corporate housing 
stock covers such regions as the Khanty-Man-
si Autonomous Okrug - Yugra, Yamalo-Nenets 
Autonomous Okrug, the Tyumen and Amur 
Regions, Primorsky Krai, the Khabarovsk 
and Krasnoyarsk Regions, Zabaykalsky Krai, 
Chechen Republic, Stavropol Krai, Krasnodar 
Krai, the Moscow, Saratov and Leningrad 
Regions. 

In addition, Federal Grid provides corporate 
assistance according to its commitments 
assumed in 2011-2013 under the programme 
for improving employees’ housing conditions. 
In 2014, corporate assistance in the form of 

interest-free loans and compensations was 
rendered to 788 employees, including 328 
young specialists. 

To attract high quality specialists and the 
youth, whose activities involve moving to 
another place, the Company compensates the 
employees’ rental costs. In 2014, we helped 
526 employees, including 355 young special-
ists, with housing rent. 

In order to execute the assignment of the 
RF President, in 2014 we implemented an 
initiative on organising health-improving rest 
of employees of the Company branches in the 
Republic of Crimea. 314 employees and their 
family members rested in health resorts and 
children’s health camps of the Republic of 
Crimea. Federal Grid partially compensat-
ed expenses for sanatorium and preventive 
treatment. 

Strengthening Corporate Culture 

The Company’s corporate culture brings 
employees together as a united team, 
providing motivation for fruitful work, en-
couraging their initiatives and facilitating 
communications. We are developing the 
corporate culture with the support of the 
key employee groups: young specialists, 
family labour dynasties, veterans. We 
have specific corporate programmes and 
events for each of the above groups. 

The Code of Corporate Ethics serves 
as a core document that establishes a 
framework for our corporate culture. 
The Code is publicly available, and each 
employee is aware of its content.

Since 2010, the Company has imple-
mented the Dynasty Programme aimed 
at fostering labour traditions and 

ensuring generational continuity. In 2014, 
a traditional Doors Open Day was organ-
ised within this Programme in all regions 
where the Company operates. The event 
included guided tours to the Company’s 
most important substations for more than 
1400 children of the Company employees. 

Children of Federal Grid’s employees 
took an active part in a children’s drawing 
contest organised by JSC Russian Grids: 
“Rosseti: Children are Drawing” devoted to 
the Company Day. On the eve of Power En-
gineers’ Day, a children’s drawing contest 
“Lightful Profession” was organised with 
participation of more than 450 employees’ 
children from four to twelve years old. 
Federal Grid Company actively engages 
with and provides assistance to the Council 
of Electric Power Industry Veterans. In 

2014, we organised celebrations for more 
than 300 veterans dedicated to Victory Day 
and the Power Engineers’ Day. 

To improve professional qualification, pro-
mote creativity and innovative thinking and 
develop technological culture, since 2013 
young specialists of Federal Grid Company 
have participated in the International fo-
rum of young power engineers “Forsazh”. 
In 2014, the Federal Grid’s team included 
representatives from Federal Grid branch-
es and the Corporate Headquarters. 

A healthy lifestyle, sport and physical ac-
tivities are promoted among the Company 
employees. Federal Grid offers them par-
tial reimbursement of gym membership 
and organises trainings for those who want 
to do sport. 

74

75

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / HR POLICYThe Company’s volleyball and indoor 
soccer teams participate regularly in 
competitions between the companies 
of the Fuel and Energy Complex. Since 
2011, Federal Grid, together with JSC 
R&D Centre of FGC UES, has organ-
ised a chess tournament in memory of 
Mikhail Botvinnik.

Youth Policy 

To develop a talent pool for the industry, 
Federal Grid is implementing initiatives to 
provide young employees with the oppor-
tunities for professional growth, and to 
attract talented and active youth into the 
industry. 

The Company’s team of 10 young special-
ists from our succession pool took part in 
the III International Forum “Energy Saving 
and Energy Efficiency” ENES 2014. Em-
ployees of MES branches were engaged 
in the Youth Round Table of JSC Russian 
Grids within the XVIII St Petersburg Eco-
nomic Forum.

In 2014, Federal Grid Company continued 
to develop mutually beneficial relation-
ships with industry-specific higher-ed-
ucation institutions and specialised 
secondary schools. Today, the Company 
cooperates on various aspects with 51 

Russian higher-education institutions and 
13 specialised secondary schools. The 
main area of cooperation with educa-
tional institutions is still the organising 
practical and pre-degree training for 
students. Over the course of 2014, more 
than 640 students got practical skills at 
the Company’s facilities; temporary jobs 
with time wage were created for 200 of 
them. In 2014, 50 students were involved 
in the Company’s target scholarship pro-
gramme. Upon graduation, 41 students, 
who had been trained at the Company’s 
facilities, were hired by Federal Grid 
Company. Annually, we hire 400 gradu-
ates from higher-education institutions. 

In April – May 2014, a traditional annual 
Day of Federal Grid Company was organ-
ised in 34 leading higher-education institu-
tions and 3 specialised secondary schools 
involving more than 2,100 students. 

In the reporting year, 28 senior power 
engineering students received additional 
theoretical and practical knowledge in the 
“School of Young Engineer” organised at 
the premises of the Personnel Training 
Centre “Bely Rast” of MES Centre.

In autumn 2014, the Chairman of the 
Federal Grid’s Management Board Andrey 
Murov held a meeting with students of 
MPEI. They discussed the development 
prospects of the Russian grid complex 
and the related issues of personnel 
training. 

In summer 2014, there was a fifth season 
of Federal Grid’s student construction 
teamwork. The MPEI sent 10 student 
teams with the total number of 121 
students to work on 10 projects under 
construction. 

Charity 

Traditionally, Federal Grid Company provides charity support within the following areas: :

•  Support of the activities in the educa-
tional, scientific and cultural fields, 
public awareness campaigns

•  Support of the activities in the field of 

•  Social rehabilitation of orphaned 

children and children without parental 
care, neglected children and children 
under conditions of hardship 

physical culture and sport 

•  Support of the activities in the field of 

•  Protection and adequate maintenance 

of buildings, facilities and territories of 
historic, religious, cultural or environ-
mental importance 

health care, healthy lifestyle promotion, 
improvement of moral and psychologi-
cal condition of citizens 

•  Assistance for those who have suffered 

from natural disasters, environmental 
or industrial disasters or other ca-
tastrophes

•  Support of individuals who need a 

surgery to protect the life and health 
(including for prevention of disability 
and long-lasting rehabilitation), and 
those who need treatment of serious 
disease

HE ALTH AND SAFET Y 

Creating Safe Working Conditions 

Labour Protection

Our health and safety measures are aimed 
at eliminating workplace injuries and 
occupational diseases, promoting safe 
conduct and developing accident-pre-

vention skills among employees, as well 
as improving working conditions.By the 
end of 2014, the number of accidents was 
reduced to four, which is 33% less than in 

the previous year. The number of injures 
was reduced from 12 to 4 people. We aim 
to prevent fatal accidents, though there 
was one fatal accident in 2014. 

Injury and Fatality Rates at the Company’s Facilities 

Динамика уровня общего и смертельного травматизма на объектах Компании

25

20

15

10

5

0

1.153

1.040

0.880

0.700

0.654

0.542

0.327

0.512

0.231

0.102

0.181

0.511

0.523

0.426

0.302

0.254

0.114

0.149

0.190

0.187

0.160

0.113

0.145

0.071

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

total number of injured persons 

including fatalities

0.148

0.037

2014

Since 2002, no cases of occupational 
diseases have been registered in Feder-
al Grid Company. Health screening and 
health checks are provided to monitor 
employee health. Since 2012, a compre-
hensive programme has been implement-
ed to improve working conditions at the 
facilities of MES branches.

Динамика общих затрат ФСК на улучшение 
санитарно-бытовых условий труда, млн руб.

Total Costs for 
Improving Sanitary and 
Living Conditions for 
Employees, RUB million 

163.7

140.2

119.3

Динамика количества пожаров на объектах ФСК в 2010-2014 гг.

Динамика затрат на охрану окружающей среды, млн руб.

12

243

Burnings 

Fires

1

1

91

107

На охрану земельных ресурсов

41.6

35.6

44.5

32.8

21.8

На охрану водных объектов

37.2

19.7

20.3

20.6

16.5

40

30

20

10

0

2012 

2013 

2014

2010

2011

2012 

2014

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

2013 

2014

3

116

2

58

2013

76

На охрану атмосферного воздуха

77

5.2

4.3

4.8

1.6

2010 

2011 

2012 

2013 

2014

Внедрение СЭМ

3,8

3,9

4,2

Иные расходы

3,2

3.0

1.6

 2011 

2012 

2013 

2014

 2013 

2014

11.3

3

2

1

0

Динамика объемов выбросов в атмосферный 

воздух загрязняющих веществ, т

Динамика объемов водопотребления, млн куб. м

Динамика объемов образования отходов, тыс. т

184.0

162.7

114.7

90.3

75.5

1.39

1.32

1.28

1.24

1.16

12.9

13.3

15.7

14.3

9.9

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

Динамика объемов переданных отходов, тыс. т

Структура вопросов, рассмотренных Советом директоров в 2014 году

16

12

8

4

0

4.1

8.8

6.4

8.7

6.4

8.6

5.9

8.2

3.8

6.2

2010

2011 

2012

2013

2014

Передано сторонним организациям для захоронения

Передано сторонним организациям для обезвреживания и использования

A

B

C

D

E

F

G

H

Актуализация долгосрочной стратегии ФСК

Бизнес-планирование

Совершенствование системы мотивации работников ФСК

12 / 11%

Корпоративная социальная ответственность и устойчивое развитие

Инвестиционная политика

Совершенствование внутренних документов ФСК

Определения позиции представителей ФСК в органах управления ДЗО

9 / 8%

Иные вопросы компетенции Совета директоров

65 / 60%

H

4 / 4%

7 / 7%

2 / 2%

7 / 6%

2 / 2%

A

B

%

C

G

D

E

F

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / SOCIAL POLICY 
 
 
To improve production safety, we take precautions to safeguard 
our employees before conducting any kind of repair work, assess 
risks to employee safety and develop corrective actions, and 

conduct regular safety checks on work carried out by our repair 
teams. Furthermore, during the reporting year we implemented 
the following health and safety initiatives:

ENVIRONMENT

Environmental Protection 

•  A scheduled assessment of working 
conditions was performed at 5,935 
workplaces 

Our Company’s responsible approach to environmental protection aims to increase environmental safety level and to ensure the 
reliable and environmentally safe transmission and distribution of power.

•  A behavior-based safety programme 
was implemented aimed at changing 
attitude of employees to conscious 
observance of safety practices, which 
resulted in improving employee safety 
behaviour 

•  Efficient operation of 50 permanent 

and 17 mobile health and safety offices 
was organised to promote safe working 
conditions and to train personnel to use 
safe practices, taking account of up-to-
date requirements 

•  We use mobile video recorders aimed at 
recording the most dangerous actions 
of employees working on electrical 
installations with further corrective 
action 

•  Labour Protection Days and Road Traf-

fic Safety Months were organised 

•  Stress-release rooms for substation 

personnel are in operation 

•  A review competition was conducted 

for the best organisation of work in the 
area of health and safety among the 
Company’s MES and PMES branches

Industrial Safety 

In 2014, Federal Grid Company operated 
278 hazardous industrial facilities (HIFs) 
of III and IV hazard classes. In the re-
porting year, we were licensed to operate 
explosive and flammable and chemically 
hazardous industrial facilities of I, II and 
III hazard classes. 

The Company developed an accident 
management plan for hazardous industri-
al facilities, and received approval from 
Rostechnadzor for its Regulations on 
investigation, record and analysis of acci-
dents at hazardous industrial facilities.

During 2005-2014, no accidents and 
incidents were registered at the Compa-
ny’s HIFs. We meet all industrial safety 
requirements in accordance with the 
procedure established by the legislation.

Furthermore, with the scope of recon-
struction and renovation programmes, 
we continue to implement innovative 
and energy efficient technologies and 
to improve technological processes, 
which help to reduce harmful environ-
mental impact.”

What are the main components 
of the formula for environmental 
safety of Federal Grid’s opera-
tions? 

policy of Federal Grid Company for 
the period from 2015 to 2019 was 
approved by the Chairman of the Man-
agement Board. 

“Our Company is pursuing a com-
prehensive approach to addressing 
issues of ensuring the environmental 
safety and rational use of natural 
resources. It helps us to be successful 
in achieving our environmental goals, 
to minimise environmental risks, and 
to improve corporate social responsi-
bility. 

Our approach is underpinned by 
implementation of the environmental 
policy. In March 2015, a Programme 
for implementing the environmental 

Implementing the environmental 
management systems at our facilities 
is an important component of our 
environmental policy. In the reporting 
year, the compliance audits of such 
systems at the Company Head-
quarters and four branches were 
successfully performed and resulted 
in the issuance of ISO 14001:2004 
compliance certificates. 

Nikolay Shvets  
Deputy Chairman of the 
Management Board of 
Federal Grid Company 

Fire Safety

During 2014, three fires occurred at the 
Company’s substations, two of which owing 
to the fault in high-voltage bushings of the 
autotransformers, and one due to the fault 

in cable sleeve locating at the Company’s 
substation but belonging to another owner. 
No fires due to violation of fire safety rules 
occurred at Federal Grid Company.

Динамика общих затрат ФСК на улучшение 
санитарно-бытовых условий труда, млн руб.

Динамика количества пожаров на объектах ФСК в 2010-2014 гг.
Fires and Burning* at the Company’s facilities 

163.7

140.2

119.3

12

243

Burnings 

Fires

1

1

91

107

2012 

2013 

2014

2010

2011

2012 

3

116

2014

2

58

2013

*Burning means an uncontrolled combustion beyond a special point and entailing no losses 

Динамика затрат на охрану окружающей среды, млн руб.

The improvement of fire safety over the 
last few years has been the result from 
the implementation of the Programme 
for enhancing and upgrading fire safety at 
the Company’s facilities for the period of 
2011–2017 for a total amount of RUB1.06 
billion. As of the end of 2014, RUB301.5 
million was spent within the Programme.

На охрану земельных ресурсов

41.6

35.6

44.5

32.8

21.8

Matters of environmental management 
are considered at all levels of govern-
ance. In 2014, the Board of Directors 
approved the revised version of the 
Environmental Policy and decided to 
draft the Programme for implementing 
the environmental policy of Federal Grid 
Company for the period 2015-2019. The 
Environmental Policy includes technical 
and organisational measures intended 
to mitigate the negative environmental 
impact of the Company’s operations.

40

На охрану водных объектов

30

20.3

20

19.7
The principles and tools of environmen-
tal activities of Federal Grid, mid- and 
long-term milestones are defined in the 
Concept of Environmental Development of 
the Electric Grid Complex.

10

16.5

0

2010 

2011 

2012 

2013 

2014

2010 

2011 

2012 

To ensure a high level of environmental 
management, we are committed to embed 
voluntary international environmental 
standards in our practices. Since 2011, 
the Company Headquarters and branches 
have been working on the systematic im-
plementation and certification of the Envi-

ronmental Management System (EMS) for 
compliance with the requirements of the 
international standard ISO 14001:2004.

In 2014, the EMS was implemented in 
the MES East branch. Auditors from the 
independent international certification 
company Bureau Veritas confirmed its 
efficiency, effectiveness and suitability 
for continuous improvement. During 
37.2
the reporting period, a compliance 
audit of the Environmental Management 

Systems of the Corporate Headquar-
ters and the branches MES South, MES 
North-West and MES Centre was also 
performed, and their certification status 
was confirmed.

Within the cooperation with the World 
Wide Fund for Nature (WWF), at the last 
Saturday of March 2014, our Company 
took part in a worldwide event Earth 
Hour, by turning off power for one hour at 
more than 207 facilities.

20.6

2014

2013 

The total amount of the Company’s 
environmental costs and investments in 
2014 was RUB225.8 million, of which RUB127 
million for capital expenditures and RUB98.8 
million for current environmental costs. 

На охрану атмосферного воздуха

5.2

4.3

4.8

1.6

2010 

2011 

2012 

2013 

2014

Внедрение СЭМ

3,8

3,9

4,2

Иные расходы

3,2

3.0

1.6

 2011 

2012 

2013 

2014

 2013 

2014

11.3

3

2

1

0

Динамика объемов выбросов в атмосферный 
78
воздух загрязняющих веществ, т

Динамика объемов водопотребления, млн куб. м

Динамика объемов образования отходов, тыс. т

79

184.0

162.7

114.7

90.3

75.5

1.39

1.32

1.28

1.24

1.16

12.9

13.3

15.7

14.3

9.9

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

Динамика объемов переданных отходов, тыс. т

Структура вопросов, рассмотренных Советом директоров в 2014 году

16

12

8

4

0

4.1

8.8

6.4

8.7

6.4

8.6

5.9

8.2

3.8

6.2

2010

2011 

2012

2013

2014

Передано сторонним организациям для захоронения

Передано сторонним организациям для обезвреживания и использования

A

B

C

D

E

F

G

H

Актуализация долгосрочной стратегии ФСК

Бизнес-планирование

Совершенствование системы мотивации работников ФСК

12 / 11%

Корпоративная социальная ответственность и устойчивое развитие

Инвестиционная политика

Совершенствование внутренних документов ФСК

Определения позиции представителей ФСК в органах управления ДЗО

9 / 8%

Иные вопросы компетенции Совета директоров

65 / 60%

H

4 / 4%

7 / 7%

2 / 2%

7 / 6%

2 / 2%

A

B

%

C

G

D

E

F

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / HEALTH AND SAFETY 
 
 
Динамика объемов переданных отходов, тыс. т

Динамика объемов переданных отходов, тыс. т

Water Consumption in 
2014 was reduced by

9.6%

4,1

6,4

Decrease 
in volume of waste 
disposed in landfills, 
compared to 2013, was by 

6,4

4.8%

5,9

Динамика затрат на охрану окружающей среды, млн руб.

Environmental Costs, RUB million

41.6

35.6

44.5

37.2

32.8

3,8

3,8

Waste Transferred. thousand tonnes 

8,8

8,7

4.1

8.8

8,6

4.4

8,2

6,2

8.7

3.8

6.2

6,2

4,1

8,8

Above-
limit payments 
for negative environmental 
impact were reduced by 
6,4

6,4

5,9

7.8%

8,7

6.4

8.6

8,6

5.9

8,2

8.2

2010 

2010

2011

2011 

2012

2013

2010
2012 

2014

2011

2012

2013 

2013

2014

2014

Transferred to outside organisations for disposal

21.8

20.3

19.7

20.6

16.5

5.2

2010

3.8

1.6

2011

4.3

3.9

4.8

3.2 3.0

11.3

4.2

1.6

2012

2013

2014

Transferred to outside organisations for disposal

Transferred to outside organisations for recycling or reuse

Transferred to outside organisations for recycling or reuse

Water Consumption, 
million m3

Waste Generation, 
thousand tonnes

Air Emissions,  
tonnes 

1.39

1.32

1.28

1.24

9.9

1.16

12.9

13.3

15.7 14.3

114.7

90.3

75.5

184.0

162.7

For protection of land resources

For protection of water bodies

For air protection

For EMS implementation

Other costs

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

2010  2011  2012  2013  2014

Total volume of air emissions has in-
creased annually owing to the extended 
inventory of new sources of emissions 
(SF6 insulated equipments, welding sta-
tions, garages, workshops, etc.). 

The key factor for waste generation is 
the commissioning of new facilities, 
as well as various maintenance and 
repair activities at the Federal Grid’s 
facilities.

Since 2012, an annual decrease in water 
consumption has been observed due to 
the reduction of water loss resulted from 
the measures taken for the maintenance 
and repair of water supply facilities in the 
Company branches – MESs and PMESs.

There is an annual increase in volume 
of waste transferred for further dis-
posal in landfills, which indicates the 
reduction of negative environmental 
impact. 

The Company pays a special attention 
to utilisation of equipment containing 
trichlorobiphenyl. In the reporting year, 
Federal Grid handed over 4,134 static 
capacitor banks containing trichloro-
biphenyl to specialised institutions for 
recycling. Reconstruction and re-equip-
ping of the Company’s facilities involve a 
mandatory replacement of such equip-
ment. By now, a quarter of the equip-
ment containing trichlorobiphenyl has 
been removed and utilised. 

Priorities for 2015

• Approve the Programme for 

implementing the environmental 
policy for 2015-2019 

Siberia, get certification of the Company 
and receive ISO 14001:2004compliance 
certificate

• Improve environmental control and 

• Develop corporate standards for 

reporting 

• Implement the Environmental 

Management System in MES Siberia, 
MES Ural, MES Volga, MES Western 

environmental safety at all life cycle stages 
of electric grid facilities 

80

81

SOCIAL RESPONSIBILITY AND SUSTAINABLE DEVELOPMENT / ENVIRONMENTCorporate governance

Effective governance system and qualified 
leadership team play a key role in 
determining and delivering Federal Grid 
Company’s strategy, thus providing a sound 
framework for successful achievement of 
the Company’s strategic objectives

GOVERNANCE SYSTEM 

CORPOR ATE GOVERNANCE PRINCIPLES 
Commitment to Best Practices 

Ensuring the effectiveness and reliability 
of the Company’s corporate governance 
system, we strictly comply with the 
principles of the Federal Grid’s Corporate 
Governance Code and are guided by the 

rules of positive engagement between 
shareholders, the Board and the Com-
pany’s executive bodies in improving the 
Federal Grid’s corporate governance 
system and practices. 

Corporate governance principles of Federal Grid Company 

S

N

I B I L I TY +

O

P

S

E

R

+

M
S

I

L

A

N

O

I

S

S

E

F

PRO

NNE+

E

F

F

E

C

T

I

V

E
N
E
S
S

+

O

P

E

TRANSPARENCY
ensuring timely and 
accurate disclosure of all 
material information on the 
Company’s operations, and 
free access to the informa-
tion for all stakeholders 

ACCOUNTABILITY
the Board of Directors is 
accountable to all share-
holders in accordance with 
the applicable legislation, 
and the Company executive 
bodies are accountable 
to the General Meeting 
of Shareholders and the 
Board of Directors 

FAIRNESS
protecting shareholder 
rights and treating all 
shareholders equally

RESPONSIBILITY 
recognising the legal rights 
of all stakeholders for the 
purpose of the Company 
growth and financial sta-
bility

Reliability

=

Governance

Infrastructure

Technology

+

+

+

Cooperation

Strategy

Board of Directors’ Statement of 
Compliance with Corporate Governance 
Principles 

Federal Grid Company follows advanced 
corporate governance standards, grad-
ually integrating new requirements and 
recommendations into its governance 
system and constantly improving mecha-
nisms and procedures for its implemen-
tations. 

On 21 March 2014, a significant event 
happened in the Russian system of corpo-
rate governance: the Board of Directors 
of the Bank of Russia approved the new 
Corporate Governance Code1. In accord-
ance with the assignments of the Russian 
Government2, Federal Grid Company has 
been included in the list of state-owned 
companies in which principles and provi-
sions of the new Code should be imple-
mented as a matter of priority.

As a first step, in the reporting year 
the Company conducted a review of the 
compliance of its corporate governance 
system with the provisions of the new 
Code. The review was conducted using, 
among other things, the guidance materi-
als available on the website of Rosimus-
chestvo and aimed at evaluating corpo-
rate governance quality in state-owned 
companies.

Following the review, we concluded that 
Federal Grid Company complies with the 
majority of principles set by the Code.

1 Letter of the Bank of Russia “On the Corporate Governance Code” No. 06-52/2463 dated 10 April 2014.
2 Assignments No. DM-P36-46pr dated 28 May 2014 and No. ISH-P13-5859 dated 31 July 2014

83

СтратегияТехнологииУправлениеПерсоналСтратегияТехнологииУправлениеПерсонал 
 
 
 
To put new recommendations of the Code 
into the Company’s practice, we have 
developed an action plan1 that covers all 
aspects of the Federal Grid’s corporate 
governance system (model) and practices: 

•  Updating the Articles of Association to 

take account both of certain recommen-
dations of the Corporate Governance 
Code, and the last amendments to the 
Civil Code 

•  Updating the Regulations on the Gen-

eral Meeting of Shareholders, Board of 
Directors and its committees 

•  Adopting new version of the Corpo-

•  Improving the internal control and risk 

rate Governance Code of Federal Grid 
Company

management systems 

•  Improving the remuneration policy ap-
plied to members of the governing and 
control bodies 

•  Establishing position of Corporate 

Secretary 

•  Expanding the Audit Committee’s role 
and developing internal audit function

•  Refining the Federal Grid’s information 
policy, including with the account of 
new requirements of the Bank of Russia 
to securities issuers. 

As a result, the Company has been 
committed to comply with the majority of 
provisions of the Corporate Governance 
Code, and started to implement new 
standards in 2014. 

Corporate Governance Rating 

Since 2012, an independent consultant – 
the Russian Institute of Directors (RID) - 
has been monitoring the corporate govern-
ance practice of Federal Grid Company and 
assigns a National Corporate Governance 
Rating Score. 

The current rating score proves that the 
Company complies with Russian corpo-
rate legislation, follows the majority of 

recommendations of the Russian Code of 
Corporate Conduct1  and a number of best 
international practices and its owners have 
a low risk of experiencing losses related to 
the quality of corporate governance. 

In 2015, a re-evaluation of the Compa-
ny’s corporate governance practice will 
be performed under the updated rating 
methodology, which takes into account the 

requirements of the new Listing Rules and 
recommendations of the Russian Corpo-
rate Governance Code.

In February 
2014, Federal Grid 
Company’s National 
Corporate Governance 
Rating was confirmed 
at a level

7+

“Well-Developed 
Corporate Governance 
Practice”

What are the Company’s 
priorities in the area of 
corporate governance following 
the adoption of the new 
Corporate Governance Code in 
2014?

“In 2014, we conducted a review of 
the compliance of our corporate 
governance standards to the 
provisions of the Russian Corporate 
Governance Code. 

Following the review, we have 
developed an action plan – ‘road 
map’, which provides for the gradual 
integration of new requirements and 
recommendations into our corporate 
governance system, and takes into 
account the recent trends in the 
regulation of corporate relations. 

All these measures will allow us 
to ensure, among other things, 
compliance of our corporate 
governance system with the 
requirements of the new Listing Rules 
of the Moscow Stock Exchange in 
order to maintain the Federal Grid’s 
shares in the Level I quotation list.” 

Corporate Governance Scheme

Shareholders’ Agreement*

A

B

C

Rosimuschestvo 

0.59%

JSC Russian Grids

80.13%

Minority 
shareholders 

19.28%

t

e

e

C

ral M

e
n
e
G

B

i n g of Sh

a

r

e

А

%
%

h

o

l

d

e
r
s

Election 

B

Reports

xtern al I n d ependen

t 

A

E

u

d

i

t

o
r

Election 

Election 

Reports and 
recommenda-
tions

Election 
of Chairman 

Reports

Maria Tikhonova  
Deputy Chairman, member 
of the Management Board 
of Federal Grid Company 

Au d it   C ommissio

n

d

Bo a r

Reports

  o f  Directo

r

s

Election 

  C ommitte

e

s

d

Bo a r

Audit Committee 
HR and Remuneration
Committee
Strategy Committee
Investment Committee

•  Timely, accurate and fair disclosures, 

•  Effective risk management 

including in the area of financial 
reporting 

•  Corporate culture and ethics 

The main elements of the Federal Grid’s 
corporate governance system (model) and 
practice are as follows:

•  Mechanisms to ensure and protect 

shareholder rights 

•  Governance and control structure, en-

suring the effective interaction between 
the governing and control bodies and 
clear division of their responsibilities

Election of members 
of the Management Board 
and control

Reports and 
recommendations

Reports

Reports

e m ent Board 

M

a

n

a

g

e

m
e
n

t Board

e Man a g

h
t
f
o

n

a

m

r

i
a

h

C

1 The action plan was approved by the RF Government and the Federal Grid’s Board of Directors on 12 March 2015 (Minutes No. 255 dated 16 March 2015)

* Shareholders’ Agreement Pursuant to the Decree of the RF President No. 1567 dated 22 November 2012, an agreement was signed by the Federal Grid’s 
shareholders – the Federal Agency of State Property Management (Rosimuschestvo) and JSC Russian Grids – regarding the managing and voting in Federal Grid 
Company. By its legal nature, the document signed is a shareholders’ agreement, which is provided for by the Article 32.1 of the Federal Law “On Joint Stock 
Companies” and regulates issues of the Company’s shareholders’ interaction regarding the exercise of rights attached to shares. In particular, in order to retain the 
State control over the operations of the strategic Company, the Federal Grid’s shareholder JSC Russian Grids is committed to vote as instructed by Rosimuschestvo 
on matters reserved to the General Meetings of Shareholders and certain matters reserved to the Board of Directors.

1 The score has been assigned under the methodology in force at the time, which did not cover the recommendations of the new Russian Corporate Governance Code 
and the amendments to the Listing Rules. 

84

85

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM  
 
 
 
 
GOVERNING AND CONTROL BODIES 

General Meeting of Shareholders 

Composition of the Board of Directors 1 

elected by the General Meeting of Shareholders on 27 June 2014 (as of 31 December 2014) 

the shareholders to ask questions about 
the matters on the agenda, and the voting 
results are announced at the Meeting. 

Annual General Meeting of Shareholders

• To elect members of the Board 

of Directors and the Audit 
Commission 

• To approve the external auditor 

for 2015 

• To approve a related party 

transaction involving Directors’ 
and Officers’ liability insurance 

• To pay dividends for the first 

quarter of 2014 

The 2014 Annual General 
Meeting of Shareholders of 
Federal Grid Company was held 
on 27 June 2013. In accordance 
with the AGM agenda, the 
shareholders adopted the 
following resolutions:

• To approve the Company’s 
annual report and annual 
financial statements for 2013 

• To pay no dividends on 

common shares for 2013, 
and no remuneration to the 
Board members, since the 
Company incurred a loss in the 
accounting period 

The General Meeting of Shareholders 
(GMS) is the supreme governing body of 
Federal Grid Company. Its competence 
is defined by the Federal Law “On Joint 
Stock Companies” and the Company’s Ar-
ticles of Association, and includes, among 
other things, such serious matters as 
payment of dividends, approval of annual 
reports and annual financial statements, 
election of an external auditor, reorgan-
isation and liquidation of the Company, 
election of members of the Board of 
Directors and the Audit Commission and 
termination of their powers, approval 
of large transactions and related party 
transactions. 

Federal Grid Company strives to create 
most favourable conditions for its share-
holders enabling them to participate in 
the GMS, and complies with the majority 
of recommendations of the Russian Cor-
porate Governance Code, related to the 
preparation for and holding of the General 
Meeting of Shareholders. 

The Company ensures that its sharehold-
ers can timely and freely receive materi-
als on all issues of the GMS agenda, and 
makes them available on its corporate 
website. The procedures for holding 
the GMS set by the Company’s internal 
documents, provides an opportunity for 

BOARD OF DIRECTORS

Professionalism   
and Responsibility 

The Board of Directors is responsible 
for the general oversight of the Company 
and its business, and plays a key role in 
the Federal Grid’s corporate governance 
system. 

The main functions of the Board of Direc-
tors are as follows: 

•  To shape the Company’s strategy and 

monitor its implementation 

•  To ensure the exercise and protection 
of rights and legal interests of Feder-
al Grid’s shareholders; to protect the 
Company’s assets 

•  To maintain sound internal control and 

risk management system 

•  To monitor activities of the executive 
bodies, to undertake regular perfor-
mance evaluation of senior managers 
and to establish and maintain effective 
incentive schemes and development 
programmes for them 

•  To ensure timely disclosure of full and 
fair information on the Company’s 
operation 

•  To establish a system for managing 

subsidiaries and associates 

In accordance with Clause 16.1 of Article 16 
of the Federal Grid’s Articles of Associa-
tion, the Board shall include 11 members. 
This number of Board members best fits 
the Company’s goals and objectives, and 
allows us to ensure a required balance of 
knowledge, professional skills and experi-
ence on the Board. 

The Company also aims to maintain a 
balance on the Board with respect to all 
shareholders’ interests: the Board of 
Directors includes representatives of 
minority shareholders.

Oleg 

Budargin 

Vyacheslav 
Kravchenko 

Maxim  
Bystrov 

•  Chairman of the Board of 

Directors2

•  Non-executive Director 
•  Board member since 2010

•  Deputy Chairman of the Board 

•  Member of the HR and 

of Directors2

Remuneration Committee 

•  Non-executive Director

•  Non-executive Director 

•  Board member since 2012 

•  Board member since 2014 

Born in 1960

Born in 1967

Born in 1964

In 1982, graduated from Norilsk 
Industrial Institute with a degree 
in Industrial and Civil Engineering; 
PhD in Economics 

Experience:

2007-2009 – Assistant to the 
Plenipotentiary Representative of 
the Russian President in Siberian 
Federal District 

2009-2013 – Chairman of Feder-
al Grid Company’s Management 
Board 

since 2013 – General Director of 
JSC Russian Grids 

since 2012 – member of the Pres-
idential Commission for Strategic 
Development of Fuel and Energy 
Secor and Environmental Security

Positions in governing bodies of 
other organisations: 

Chairman of the Supervisory Board 
of Non-Profit Partnership Associ-
ation of Solar Energy Enterprises 
Chairman of the Board of Directors 
of JSC Moscow United Electric Grid 
Company and PJSC Federal Test 
Centre 

Member of the Supervisory Board 
of JSC Russian Regional Develop-
ment Bank; member of the Board of 
Directors of JSC Russian Grids and 
JSC INTER RAO, member of the Su-
pervisory Board of the North-Cau-
casus Federal University, member 
of the Board of Trustees and the 
Academic Council of the National 
Research University “Moscow Pow-
er Engineering Institute” 

S h a r e i n t h e C o m p a n y ’s 
o r d i n a r y s to c k : 0 . 0 0 0 6 4 4 0 %

In 1995, graduated from Lomon-
osov Moscow State University with 
a degree in Jurisprudence

Experience:

2006-2008 – Director of the 
Department of Structural and 
Investment Policy in Industry and 
Energy of the Ministry of Industry 
of the Russian Federation

2008-2010 – General Director of 
RN Energo LLC

2010-2012 – General Director of 
JSC United Energy Service Com-
pany 

2012-2013 – Chairman of the 
Management Board of Non-profit 
Partnership Market Council and 
Chairman of the Management 
Board of JSC Trade System Admin-
istrator of the Wholesale Energy 
Market 

since 2013 – Deputy Minister of 
Energy of the Russian Federation 

Positions in governing bodies of 
other organisations:

Chairman of the Board of Direc-
tors of JSC Financial Settlements 
Centre, member of the Board 
of Directors of JSC INTER RAO, 
JSC Russian Grids, JSC System 
Operator of Unified Energy System, 
JSC Moscow United Electric Grid 
Company, and JSC RusHydro, state 
representative in the Supervisory 
Board of Non-Profit Partnership 
Market Council 

H o l d s n o s h a r e s i n t h e 
C o m p a n y 

In 1986, graduated from Moscow 
Civil Engineering Institute named 
after V.V.Kuibyshev with a degree in 
Hydraulic Engineering of River In-
stallations of Hydroelectric Power 
Plants; in 1998 - from the Russian 
Academy for Foreign Trade with a 
degree in World Economy 

Experience:

2009-2010 – Deputy Director of the 
Department of Industry and Infra-
structure of the RF Government 

2010-2013 - Deputy Plenipotenti-
ary Representative of the Russian 
President in North Caucasian 
Federal District 

since 2013 – Chairman of the Man-
agement Board of JSC Trade Sys-
tem Administrator of the Wholesale 
Energy Market 

since 2013 – acting Chairman of 
the Management Board, since May 
2014 – Chairman of the Manage-
ment Board of Non-profit Partner-
ship Market Council 

Positions in governing bodies of 
other organisations:

Chairman of the Board of Directors 
of JSC Northern Caucasus Resorts, 
JSC International Airport Mineral-
nye Vody 

Member of the Supervisory Board 
of Non-profit Partnership Market 
Council Non-profit Partnership 
Market Council, member of the 
Board of Directors of JSC RusHy-
dro, JSC System Operator of Unified 
Energy System 

H o l d s  n o s h a r e s i n  t h e 
C o m p a n y

86

87

1 Here and elsewhere, personal information about members of the governing and control bodies is disclosed with their consent.
2 Decision of the Board of Directors dated 23 July 2014 (Minutes No. 223 dated 24 July 2014)

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Andrey  
Demin 

Boris  
Kovalchuk 

Sergey  
Mironosetsky 

•  Chairman of the Strategy 

•  Member of the Audit 

Committee 

Committee 

•  Non-executive Director 

•  Non-executive Director 

•  Board member since 2014 

•  Board member since 2012

•  Chairman of the Audit 

Committee and the HR and 
Remuneration Committee 

•  Non-executive Director 

•  Board member since 2014 

Andrey  
Murov 

•  Executive Director 

•  Board member since 

2013 

Georgy  
Nozadze 

Denis  
Fedorov 

•  Member of the Strategy 

Committee 

•  Non-executive Director 

•  Board member since 2014

•  Member of the Audit 

Committee and the HR and 
Remuneration Committee 

•  Non-executive Director 

•  Board member since 2011

Born in 1974

Born in 1977 

Born in 1965

Born in 1970

Born in 1979

Born in 1978

In 1996, graduated from Zapor-
ozhye State University with a 
degree in Applied Mathematics; in 
1999, graduated from Zaporozhian 
Institute of Economics and Infor-
mation Technologies with a degree 
in Finance 

Experience:

2007-2010 – Deputy Chairman of 
the Management Board, member 
of the Management Board of Fed-
eral Grid Company 

2010-2012 – Adviser to the General 
Director on strategic development 
of Mezhregionsbyt LLC

2012-2013 – Advisor to the Chair-
man of the Management Board of 
Federal Grid Company 

since 2013 – First Deputy General 
Director for Economic Affairs and 
Finance of JSC Russian Grids 

Positions in governing bodies of 
other organisations:

In 1999, graduated from St 
Petersburg University with a 
degree in Jurisprudence; in 2010, 
graduated from the Institute of 
Advanced Training for Executives 
and Experts of Fuel and Energy 
Sector, and the non-profit partner-
ship Corporate Educational and 
Research Centre of UES 

Experience:

2006-2009 – Head of the Depart-
ment of National Priority Pro-
jects of the Russian Government, 
Assistant to the First Deputy Prime 
Minister of the Russian Federation

since 2009 – Deputy Director 
General for Development of State 
Nuclear Corporation ROSATOM

2009-2010 – Acting Chairman of 
the Management Board of JSC 
INTER RAO UES

since 2010 – Chairman of the 
Management Board of JSC INTER 
RAO UES 

Chairman of the Board of Directors 
of JSC Tyumenenergo 

Positions in governing bodies of 
other organisations:

In 1989, graduated from Novo-
sibirsk State University with a 
degree in Economic Cybernetics 

Experience:

2005-2011 – Deputy General 
Director, member of the Manage-
ment Board of JSC Siberian Coal 
Energy Company (SUEK)

2009-2013 – General Director, 
member of the Management Board 
of Management Company SUEK 
LLC (since 07.09.2011 –Siberian 
Generating Company LLC)

Positions in governing bodies of 
other organisations:

Member of the Board of Directors 
of JSC Inter-regional Distribution 
Grid Company of Siberia, SUEK 
LLC, JSC Russian Grids

H o l d s n o s h a r e s i n t h e 
C o m p a n y 

Member of the Board of Directors 
of JSC Far East Energy Man-
agement Company, JSC Moscow 
United Electric Grid Company

H o l d s  n o s h a r e s  i n  t h e 
C o m p a n y

Chairman of the Board of Directors 
of JSC First Generating Company 
of Wholesale Electricity Market, 
CJSC Kambaratinskaya Hydro 
Power Plant-1, JSC Third Gen-
erating Company of Wholesale 
Electricity Market 

Member of the Board of Directors 
of JSC INTER RAO UES, RIG RE-
SEARCH PTE Ltd, member of the 
Supervisory Board of JSC Russian 
Regional Development Bank

Member of the Management Board 
of the Russian Union of Manufac-
turers and Entrepreneurs 

H o l d s n o s h a r e s i n t h e 
C o m p a n y

Graduated from Lomonosov Mos-
cow State University with a degree 
in Physics

Experience:

2008-2012 – Assistant, Head of the 
Department of Oil and Gas Industry 
Development, Deputy Director of 
the Department of State Regu-
lation of Tariffs, Infrastructural 
Reforms and Energy Efficiency 
of the RF Ministry of Economic 
Development 

since 2012 – Assistant of the 
Expert Directorate of the Executive 
Office of the RF President 

H o l d s n o s h a r e s  i n t h e 
C o m p a n y

In 1993, graduated from St Peters-
burg State University with a degree 
in Jurisprudence; in 1998, took a 
special retraining course in Finan-
cial Management at the Inter-disci-
plinary Institute of Advanced Train-
ing and Retraining for Executives. 
In 2009, graduated from the State 
University of Civil Aviation with a 
degree in Freight Regulation and 
Air Transport Management. PhD in 
Economics 

Experience:

2007-2012 – General Director of 
JSC Pulkovo Airport

2012-2013 – Deputy General 
Director, Acting General Director, 
Executive Director, member of the 
Management Board of JSC Holding 
of the Inter-regional Distribution 
Grid Companies (since 04.04. 
2013 – JSC Russian Grids)

since 2013 – Chairman of the 
Management Board of Federal Grid 
Company 

Positions in governing bodies of 
other organisations:

Member of the Board of Directors 
of JSC Russian Grids and JSC 
INTER RAO UES 

H o l d s n o s h a r e s i n t h e 
C o m p a n y

In 2001, Graduated from Bauman 
Moscow State Technical University 
with a degree in Economics and 
Management. In 2003, completed 
postgraduate studies at Moscow 
Power Engineering Institute with 
degrees in Economics and Indus-
trial Heat Power Engineering. PhD 
in Economics 

Experience:

since 2007 – Head of the Depart-
ment of Electric and Thermal 
Power Industry Development of 
JSC Gazprom

since 2009 – General Director 
of GazpromEnergoholding LLC, 
General Director of JSC Centeren-
ergoholding 

Positions in governing bodies of 
other organisations:

Board Chairman of JSC Sec-
ond Generating Company of the 
Wholesale Electricity Market, JSC 
Tumen Energy Service Company, 
CJSC Mezhregion-Energostroy, 
Non-Profit Partnership Council of 
Power Producers 

Member of the Board of Directors 
of JSC TJC-1, JSC Centerenerg-
oholding, JSC Mosenergo, JSC 
INTER RAO UES, Heat Retail Com-
pany LLC, Non-Profit Partnership 
Centre of Innovative and Energy 
Technologies, JSC Moscow United 
Energy Company, CJSC Gazprom 
Armenia 

H o l d s  n o s h a r e s i n  t h e 
C o m p a n y

1 Decision of the Board of Directors dated 23 July 2014 (Minutes No. 223 dated 24 July 2014)

88

89

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Sergey  
Shmatko 

•  Non-executive Director 

•  Board member in 2008-
2010, and since 2013

Nikolay  
Shulginov 

•  Chairman of the Investment 

Committee and member of the 
Strategy Committee 

•  Non-executive Director 

•  Board Member since 2013

Born in 1966

Born in 1951 

In 2014, there were no 
dealings in the Company’s 
shares by the Board 
members.

In 1973, graduated from No-
vocherkassk Polytechnic Institute. 
PhD in Technical Sciences 

Experience:

since 2009 – First Deputy Chair-
man of the Management Board of 
JSC SO UES 

Positions in governing bodies of 
other organisations:

Member of the Supervisory Board 
of Non-Profit Partnership Scien-
tific and Technological Council of 
Unified Energy System 

H o l d s n o s h a r e s i n t h e 
C o m p a n y

In 1992, graduated from the Facul-
ty of Political Economy of the Ural 
State University; in 1992, studied 
Economy at Marburg University in 
the FRG. In 2004, completed Ad-
vanced Academic Courses in De-
fence and Security of the Russian 
Federation of the Military Academy 
of the General Staff of Armed 
Forces of the Russian Federation. 
PhD in Technical Sciences 

Experience:

from 06.2008 to 05.2012 – Min-
ister of Energy of the Russian 
Federation 

since 2012 – member of the Pres-
idential Commission for Strate-
gic Development of the Fuel and 
Energy Sector and Environmental 
Security of the Russian Federation 

since 2013 – Special Representa-
tive of the President of the Russian 
Federation on International 
Cooperation in the Electric Power 
Industry of the Executive Office of 
the RF President 

Positions in governing bodies of 
other organisations:

Chairman of the Board of Directors 
of JSC Russian Grids 

Chairman of the Supervisory 
Board of Non-Profit Partnership 
Scientific and Technological Coun-
cil of Unified Energy System 

H o l d s  n o  s h a r e s  i n t h e 
C o m p a n y

Composition of the Board of Directors acting from 27 June 2013 to 27 June 20141
 (positions as of the election date)

1.

2.

3.

4.

5.

6.

7.

8.

9.

Oleg Budargin

Board Chairman, Non-executive Director 

Chairman of the Federal Grid Company’s Management Board

Vyacheslav 
Kravchenko 

Deputy Chairman, Non-executive Director 

Chairman of the Management Board of Non-Profit Partnership 
Market Council

Georgy Boos 

Non-executive Director

President of BOOS LIGHTING GROUP MC LLC

Pavel Grachev 

Independent Director 

General Director of JSC Far East and Baikal Region Development 
Fund

Boris Kovalchuk 

Independent Director

Chairman of the Management Board of JSC INTER RAO UES

Andrey Murov 

Executive Director

First Deputy Chairman of the Management Board of Federal Grid 
Company 

Sergey 
Serebryannikov 

Independent Director

Rector of Moscow Power Engineering Institute

Denis Fedorov 

Independent Director

Ernesto Ferlenghi 

Non-executive Director

10.

Sergey Shmatko 

Non-executive Director

General Director of JSC Centerenergoholding, General Director of 
Gazprom Energoholding LLC 

Head of the Representative Office of Eni in the Russian Federation 
and CIS

Member of the Presidential Commission for Strategic Development 
of the Fuel and Energy Sector and Environmental Security of the 
Russian Federation

11. Nikolay Shulginov 

Non-executive Director

First Deputy General Director of JSC SO UES

Board of Directors’ Performance Report on the Company’s Business Priorities 

In the reporting year, the Board of Di-
rectors continued its work on creating 
favorable conditions for delivering the 

Company’s key objectives – improv-
ing system reliability of electric power 
infrastructure, ensuring high-quality and 

accessible power for customers in the 
Russian Federation.

Some documents approved by/ discussion points of the Board of Directors in 2014 

Topics 

Document approved/Discussion points 

Updating the long-term 
strategy of Federal Grid 
Company 

Business planning 

Improving the employee 
motivation system 

Corporate social 
responsibility and 
sustainable development 

• Long-Term Development Programme of Federal Grid Company for 2015-2019 and Prospects through 2030 

• Standard for establishing and updating key performance indicators (KPIs) of Federal Grid Company 

• Standard for Business Planning 

• Business Plan of Federal Grid Company for 2014 and forecasts for 2015-2018 

• Methodology for Calculation and Evaluation of Key Performance Indicators for Federal Grid’s Senior Management for 2014 

• Revised version of the Environmental Policy of Federal Grid Company 

• Society, Customer and Government Relations Policy 

Investment policy 

• Standard for Conducting Public Technological and Pricing Audit of Investment Projects 

Updating the Federal Grid’s 
internal documents 

• Revised version of the Regulations on the Strategy Committee of the Board of Directors of Federal Grid Company 

• Revised version of the Regulations on the Investment Committee of the Board of Directors of Federal Grid Company

• Pre-approval of transactions which may entail liabilities denominated in foreign currency 

• Consideration of information on eliminating the faults noted in the comments made upon the on-site audits of the RF Ministry 

Other matters 

of Energy of the Federal Grid’s investment projects 

• Consideration of related party transactions (321 transactions) 

• Consideration of matters related to defining position of the Federal Grid’s representatives in the governing bodies of 

subsidiaries and associates 

1  Board members with independent status met, as of the election date, the 
independence criteria set by the Russian Code of Corporate Conduct and the 
Listing Rules of the Moscow Stock Exchange, which were in force until 08 
June 2014.

90

91

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM The Company plans to conduct performance evaluation of the Board of Directors and its committees with the assistance of 
an independent external facilitator. 

Attendance of Board members at Board meetings and Committee meetings during 2014 

The Board of Directors 

Investment Committee 

Strategy Committee 

HR and Remuneration 
Committee 

Audit Committee 

Oleg Budargin

Boris Kovalchuk

Vyacheslav Kravchenko

32/36

33/36

27/36

89 %

91 %

75 %

100%

80%

Denis Fedorov

35/36

97 % 

100%

100%

100%

Andrey Murov.

Sergey Shmatko 

Nikolay Shulginov 

Ernesto Ferlenghi

Georgy Boos 

Pavel Grachev

30/36

34/36

35/36

12/13

1/13

10/13

83 %

94 %

97 %

92%

8%

77%

100%

100%

50%

Board members until 27 June 2014 .

100%

Sergey Serebryannikov

13/13

100%

100%

100%

Maxim Bystrov 

21/23

91 %

100%

Board members since 27 June 2014 

Andrey Demin

23/23

100 %

Georgy Nozadze

22/23

96 %

100%

50%

Sergey Mironosetsky 

23/23

100 %

100%

100%

100%

The Board focuses on the oversight of the implementation of the Federal Grid’s strategy 

Being responsible for the strate-
gic guidance, the Board of Direc-
tors regularly deals with matters 
on the development of UNEG 
infrastructure, improvement 
of the Company management’s 
efficiency, and maintaining its 
financial stability.

The Federal Grid’s Long-Term 
Development Programme, ap-
proved in 2014, includes a list of 

key performance indicators produced 
according to the Company’s strategic 
objectives, specific aspects of its 
activities, as well as industry-wide 
strategic objectives and priorities. 

The Board of Directors will monitor 
KPI status using, among other things, 
the reports of the independent au-
ditor engaged to review the achieve-
ment of targets set in the Long-Term 
Development Programme. Following 

the review, decisions may be made 
based on the results achieved. 

Furthermore, pursuant to rec-
ommendations of the Corporate 
Governance Code, the role of the 
Audit and Strategy Committees 
will be expanded in 2015 in terms 
of the assessment of the Compa-
ny’s long-term performance.

36

meetings 
were held 
by the Board of 
Directors in 2014, 
of which

8

in the form 
of joint 
presence 

429

issues were 
considered

A

B

%

C

G

D

E

F

H

This structure does not include 321 issues 
of related party transactions’ approval 

The structure of issues 
considered by the Board 
of Directors in 2014 

A

B

C

D

E

F

G

H

Updating the Long-Term Strat-
egy ofn Federal Grid Company

4 / 4%

Business Planning

Improvingthe Employee Moti-
vation System

Corporate Social Responsibility 
and Sustainable Development

Investment Policy

Updatingthe Federal Grid’s 
internal documents

Defining position of the 
Federal Grid’s representatives 
in the governing bodies of 
subsidiaries and associates

7 / 7%

12 / 11%

2 / 2%

7 / 6%

2 /2 %

9 / 8%

Other matters within the 
Board’s competence

65 / 60%

92

93

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM COMMIT TEES OF THE BOARD OF DIRECTORS

HR and Remuneration Committee 

Role and Functions

The key role of the HR and Remuneration Committee is to assist the Board of Directors in establishing efficient and transparent remuneration 
practices and developing HR and succession policies. 

The HR and Remuneration Committee:

•  Develops principles and criteria for remuneration and material incentives of members of the Board of Directors, the Management Board and 

the Audit Commission

•  •Develops recommendations regarding the material terms and conditions of contracts with members of the Board of Directors, the Chairman 

and members of the Management Board

•  •Develops criteria for selecting potential nominees to the Board of Directors, the Management Board and conducts preliminary evaluation of 

the said candidates

•  Regularly assesses performance of the Chairman and members of the Management Board, and drafts recommendations to the Board of Direc-

tors regarding their possible reappointment

Membership

Members elected by the Board of Directors on 28 November 2013 

Members elected by the Board of Directors on 29August 2014

1. Denis Fedorov, Chairman, Independent Director 

1. Sergey Mironosetsky, Chairman, Non-executive Director 

2. Boris Kovalchuk, Independent Director 

3. Sergey Serebryannikov, Independent Director

2. Maxim Bystrov, Non-Executive Director

3. Denis Fedorov, Non-Executive Director 

Activities in 2014 

The Committee held 5 meetings in absentia and considered, among other things, the following matters:

•  Recommendations to the Board of Directors with respect to the approval of the Standard for establishing and updating key performance indica-
tions (KPIs) of Federal Grid Company and the Methodology for calculating and measuring these KPIs, including their target values for 2014

•  Recommendations to the Board of Directors with respect to the amendments to employment agreements with and determination of remunera-

tion and compensation to the Federal Grid’s senior managers 

•  Recommendations to the Board of Directors with respect to the approval of the Methodology for Calculation and Evaluation of Key Performance 

Indicators for Federal Grid’s Senior Management for 2015 

The committees are established to assist 
the Board of Directors in performing its 
key functions. Such assistance includes 
preliminary discussions on the most 
important matters which are reserved 
for the Board, and development of rec-
ommendations for the Board on these 
matters. 

Members of the committees have skills, 
knowledge and experience in the areas 
of the committees’ responsibility. The 
committee members have strong working 
relationships and actively engage with the 
Company’s management team and ex-
ternal auditor, they also have may retain 
outside consultants. 

Federal Grid’s Board of Directors has four 
permanent committees: for Audit, HR and 
Remuneration, Strategy, and Investment. 

Activities of the committees are regulated 
by their terms of reference, approved by 
the Board of Directors. 

Audit Committee 

Role and Functions 

The key role of the Audit Committee is to assist the Board of Directors in providing oversight of the Company’s financial and business activities.

The Audit Committee:

•  Evaluates candidates for the Company’s external auditors and drafts recommendations to the Board of Directors regarding the appointment of 

external auditors, the conduct of annual independent audit and external auditors’ fees

•  Reviews the Company’s financial statements and results of the external audit of the financial statements with respect to their compliance with 

RF legislation, International Financial Reporting Standards, Russian Accounting Standards, other legal regulations

•  Reviews the internal control system and drafts recommendations to the Board of Directors on its improvement 

•  Approves internal audit plans in the Company 

•  Considers quarterly reports of the internal audit unit 

Membership 

Members elected by the Board of Directors on 28 November 2013 

Members elected by the Board of Directors on 29August 2014 

1. Denis Fedorov, Chairman, Independent Director 

1. Sergey Mironosetsky, Chairman, Non-executive Director 

2. Boris Kovalchuk, Independent Director 

3. Sergey Serebryannikov, Independent Director 

2. Denis Fedorov, Non-executive Director 

3. Boris Kovalchuk, Non-executive Director

Activities in 2014

The Committee held 5 meetings in absentia and considered 19 matters, including:

•  Review of the Federal Grid’s RAS financial statements for 2013, the audit report and the Audit Commission’s report 

•  Recommendations to the Board of Directors with respect to the preliminary approval of the Company’s Annual Report and Accounts 2013 

•  Review of the Federal Grid’s IFRS financial statements for 2013 

•  Recommendations to the Board of Directors regarding a candidate for external auditor for 2014 and external auditor’s fee 

•  Review of the new versions of the Company’s Internal Control Policy, Risk Management Policy and Key Operational Risk Register, recommen-

dations to the Board of Directors with respect to the approval thereof

•  Review of the Report on the Internal Control and Risk Management Effectiveness following the Results of 2013 

•  Recommendations to the Board of Directors with respect to the approval of the adjusted business plan for 2014, business plan for 2015, and 

forecast indicators for 2016-2019 

•  Review of the Standard for Auditing the Implementation of the Federal Grid’s Long-Term Development Programme, and recommendations to 

the Board of Directors with respect to the approval thereof

•  Approval of the plan for conducting internal audits for the first and the second half of 2014. 

94

95

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Strategy Committee

Investment Committee 

The key role of the Strategy Committee is to assist the Board of Directors in improving the Company’s performance efficiency in the long term. 

The key role of the Investment Committee is to assist the Board of Directors in improving and developing the Company’s investment policy. 

The Strategy Committee develops recommendations to the Board of Directors on the following matters:

The Investment Committee: 

Role and Functions

Role and Functions 

•  Measures and programmes for the development of the Unified Energy System (UES) of Russia, including developing the Unified National 

(all-Russian) Electric Grid (UNEG), including isolated energy systems
•  Measures to carry out technological connections to the electric grids
•  Processes related to the effective functioning of the wholesale electric energy market, the technological management of electric grids that are 

part of the UES of Russia

•  Control over implementation of investment projects to develop electric grids and the UES of Russia
•  Innovative technologies applied for the decision making process under the activity on electricity transmission via UNEG to the wholesale mar-

ket participants 

•  Performs expert evaluation of new investment projects and programmes, submitted for consideration of the Company’s Board of Directors
•  Timely informs the Company’s Board of Directors about risks in the area of investment activity, to which the Company and its subsidiaries and 

associates are subjected 

Membership

•  Information disclosure by the Company as a subject of natural monopoly in the electric power industry, and other issues related to the develop-

Members elected by the Board of Directors on 30 January 2014 

Members elected by the Board of Directors on 27 August 2014 

ment of UNEG

Membership

1.  Sergey Shmatko, Chairman, Non-Executive Director 

1.  Nikolay Shulginov, Chairman, Non-Executive 

2.  Ernesto Ferlenghi, Non-Executive Director 

2.  Sergey Mironosetsky, Non-Executive Director 

3.  Svetlana Balaeva, Deputy General Director for Investments of JSC 

3.  Denis Fedorov, Non-Executive Director 

Members elected by the Board of Directors on 30 January 2014 

Members elected by the Board of Directors on 27 August 2014 

Russian Grids

4.  Svetlana Balaeva, Deputy General Director for Investments of JSC 

1.  Vyacheslav Kravchenko , Chairman, Non-Executive Director 
2.  Ernesto Ferlenghi, Non-Executive Director 
3.  Nikolay Shulginov, Non-Executive Director
4.  Andrey Demin, First Deputy General Director of JSC Russian Grids 
5.  Anatoly Dyakov, President of the Unified Energy Complex 

1.  Andrey Demin, Chairman, Non-Executive Director 
2.  Georgy Nizadze, Non-Executive Director 
3.  Nikolay Shulginov, Non-Executive Director 
4.  Stanislav Ananiev, First Deputy Chairman of the Management Board 

of JSC ATS 

Corporation and the Non-Profit Partnership Scientific and Technical 
Council of UES 

5.  Oleg Isaev, General Director of JSC IDGC of Centre 
6.  Andrey Kazachenkov, First Deputy Chairman of the Management 

6.  Vladimir Dikoy, Deputy Chairman of the Management Board – Chief 

Board of JSC FGC UES 

Engineer of JSC FGC UES 

7.  Sergey Lebedev, Director of Strategic Development Department of 

7.  Andrey Kazachenkov, First Deputy Chairman of the Management 

JSC Russian Grids 

Board of JSC FGC UES 

8.  Valentin Mezhevitch, Deputy General Director for Strategic 

8.  Alexander Kalinin. First Vice-President of All-Russian Public 

Communications of JSC Russian Grids 

Organisation of Small and Medium businesses OPORA ROSSII 
9.  Viktor Kydryaviy, Adviser of the President of CJSC Eurocement 

9.  Evgeny Miroshnichnko, Director of Strategic Development of the 

Strategy and Investment Block of JSC INTER RAO UES

4.  Dan Belenkiy, First Deputy General Director for Investment Activity 

Russian Grids 

of JSC Russian Grids

5.  Dan Belenkiy, First Deputy General Director for Investment Activity 

5.  Valery Goncharov, Deputy Chairman, member of the Management 

of JSC Russian Grids 

Board of JSC Russian Grids

6.  Valery Goncharov, Deputy Chairman, member of the Management 

6.  Oleg Isaev, General Director of JSC IDGC of Centre

Board of JSC Russian Grids 

7.  Michael Kolesnikov, member of the Presidium of the Management 

7.  Michael Kolesnikov, member of the Presidium of the Management 

Board of OPORA ROSSII

Board of OPORA ROSSII 

8.  Vitaliy Korolev, Head of Electric Energy Industry Supervision 
Department of the Federal Antimonopoly Service of Russia

8.  Vitaliy Korolev, Head of Electric Energy Industry Supervision 
Department of the Federal Antimonopoly Service of Russia 

9.  Leonid Mazo, member of the Management Board of JSC FGC UES, 

9.  Leonid Mazo, member of the Management Board of JSC FGC UES 

General Director of JSC CIUS UES 

10. Alexey Makarov, member of the Russian Academy of Sciences 

10. Alexander Rogov, Head of the Energy Sector Development 
Department at the Energy Sector and Energy Marketing 
Development Division of JSC Gazprom 

Group 

10. Alexey Molskiy, Deputy Chairman of the Management Board of JSC 

11. Ilnar Mirsiyapov, member of the Management Board, Head of the 

10. Sergey Lebedev, Director of Strategic Development of JSC Russian 

FGC UES 

Strategy and Investment Unit of JSC INTER RAO UES

11. Ivan Selivakhin, Adviser to the Chairman of the Management Board 

Grids 

11. Evgeny Miroshnichnko, Director for Strategic Development of the 

Strategy and Investment Block of JSC INTER RAO UES 

12. Alexey Molskiy, Deputy Chairman of the Management Board of JSC 

FGC UES

13. Alexander Pirozhenko, Director for Priority Programme 

Development of the Agency for Strategic Initiatives, Chairman of 
the Supervisory Board of the Council of Retail Consumers of Energy 
Resources, Chairman of the Consumer Council of JSC Russian 
Grids 

14. Alexander Rogov, Head of the Energy Sector Development 
Department at the Energy Sector and Energy Marketing 
Development Division of JSC Gazprom 

15. Petr Sinyutin, General Director of JSC MOESK
16. Pavel Snikkars, Director of the Department of the Electric Energy 

Industry Development of the Russian Ministry of Energy 

17. Alexey Sukhov, Deputy Chairman of the Management Board of JSC 

ATS 

11. Evgueny Olkhovitch, Deputy Director of the Department of State 

Regulation of Tariffs, Infrastructure Reforms and Energy Efficiency 
of the RF Ministry of Economic Development and Trade 
12. Alexander Rogov, Head of the Energy Sector Development 
Department at the Energy Sector and Energy Marketing 
Development Division of JSC Gazprom 

13. Petr Sinyutin, General Director of JSC MOESK 
14. Pavel Snikkars, Director of the Department of the Electric Energy 

Industry Development of the Russian Ministry of Energy 

15. Pavel Shpilevoy, Director of Strategic Development of JSC Russian 

Grids 

12. Alexander Pirozhenko, Director for Priority Programme 

Development of the Agency for Strategic Initiatives, Chairman of 
the Supervisory Board of the Council of Retail Consumers of Energy 
Resources, Chairman of the Consumer Council of JSC Russian 
Grids

13. Alexander Rogov, Head of the Energy Sector Development 
Department at the Energy Sector and Energy Marketing 
Development Division of JSC Gazprom 

14. Ivan Selivakhin, Adviser to the Chairman of the Management Board 

of Non-Profit Partnership “Market Council” 

15. Pavel Snikkars, Director of the Department of the Electric Energy 

Industry Development of the Russian Ministry of Energy

16. Alexander Fedorov, Head of the Infrastructural Project Department 

of JSC FGC UES 

17. Svetlana Cherkaeva, Head of the Department for Investment 

Planning in Electric Energy Industry of the Russian Ministry of 
Energy 

of Non-Profit Partnership “Market Council” 

12. Ilnar Mirsiyapov, member of the Management Board, Head of the 

Strategy and Investment Unit of JSC INTER RAO UES 

13. Vladimir Vashkevitch, Deputy General Director for Grid Development 

and Services of the Federal Grid branch MES North-West 

14. Konstantin Zavizenov, Deputy Director of the Department of the 
Electric Energy Industry Development of the Russian Ministry of 
Energy 

15. Viktor Lebedev, Assistant to the Deputy Chairman of the 

Government of the RF Arkadiy Dvorkovitch1 

16. Khasan Likhov, Deputy General Director for special projects of JSC 

Russian Grids 

17. Evgueny Olkhovitch, Deputy Director of the Department of State 

Regulation of Tariffs, Infrastructure Reforms and Energy Efficiency 
of the RF Ministry of Economic Development and Trade 

Activities in 2014

Activities in 2014 

Two meetings were held: one in person and one in absentia. The following matters were considered: 

•  Long-Term Development Programme of Federal Grid Company for 2015-2019 and Prospects through 2030 
•  Priority areas of the Company’s activity, ensuring accessibility of energy infrastructure and quality of technological connection to the Compa-

ny’s electric grids 

•  Recommendations to the Board of Directors with respect to the approval of the Methodical Guidelines for determining reserve capacity at pow-

er supply sources of the Company with consideration of the comments of the Strategy Committee members 

•  Review of standard documents on technological connection submitted to the Board of Directors for consideration 

Eight meetings were held, and the following matters were considered:  

•  Elimination of faults noted in the comments made upon the on-site audits of the RF Ministry of Energy of the Federal Grid’s investment projects 

•  Making a Summary of consolidated indices of construction (reconstruction) costs of substations and transmission lines 

•  Determination of specific indices of construction costs of Federal Grid’s facilities from 201 to 2019 in the context of the delivery of the RF 

Electric Grid Complex Strategy on reducing specific investment costs by 30% as compared to 2012, broken down by voltage level of substations, 
overhead and underground power lines 

•  Regulations on Investment activity of Federal Grid Company and/or Procedure for developing and adjusting the Federal Grid’s investment 

programme and reporting on its delivery 

•  Preliminary approval of the Federal Grid’s investment programme for 2015-2019 

•  Progress report on the technological and pricing audit of the investment projects with an estimated cost of RUB1.5 billion and more each 

96

97

1 On 12 January 2014, the Board of Directors decided to remove the Investment Committee member Viktor Lebedev and to reduce the number of Committee members to 
16 persons (Minutes No. 240 dated 15 January 2014).

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM REMUNER ATION OF THE BOARD OF DIRECTORS AND ITS COMMIT TEES 

Membership of the Management Board as of December 31, 2014

Board of Directors
The procedure for determining the 
amount of remuneration and compen-
sation due to the Board members is set 
by the Regulations on Remuneration and 
Compensation to the Members of the 
Board of Directors of Federal Grid Com-
pany, as approved by the Annual General 
Meeting of Shareholders on 29 June 2012.

In accordance with the above Regula-
tions, the amount of remuneration to each 
Board member for his/her contribution to 
the operations of the Board of Directors 
depends on the following factors:

•  total number of Board of Directors’ 
meetings held during the corporate 
year;

•  number of meetings attended by the 

Board member; and

•  the Company’s revenues for the respec-

tive fiscal year.

Remuneration for the Chairman of the 
Board of Directors is increased by 30%. 
Increase is also set for members of the 
Board for their work in committees: the 
Chairman of the Committee receives a 
20% bonus, and a Committee member 
receives 10%.

No compensation for expenses of mem-
bers of the Board of Directors is provided.

The total remuneration for each Board 
member, given all premiums, cannot 
exceed RUB900 thousand.

Since the Company incurred a loss for the 
2013 fiscal year, the GMS held on 27 June 
2014 resolved to pay no remuneration to 
the Board of Directors for 2013.

The 2015 General Meeting of Sharehold-
ers will resolve on remuneration to the 
members of the Board of Directors for 
2014. 

During the reporting year, no loans (cred-
its) were provided to the Board members 
by the Company. 

Board Committees 
The Regulations on Remuneration of 
Members of the Committees of the Board 
of Directors of Federal Grid Company, 
approved by the Board of Directors on 16 
December 2010, cover matters of paying 
remuneration to members of the Board 
committees who are not members of the 
Board of Directors or the collective exec-
utive body and/or the sole executive body 
of the Company.

On a quarterly basis, committee members 
shall be paid remuneration for each meet-
ing attended. The amount of remuneration 
is equal to three minimum monthly wage 
rates for a first category worker. Remu-
neration to the Chairman of the Commit-
tee is increased by 50%.

The total amount of remuneration paid 
to members of the Board committees for 
2014 was RUB810.6 thousand.

MANAGEMENT BOARD

Effective Leadership 

The Management Board and the Chairman 
of the Management Board – collective and 
sole executive bodies – are responsible 
for the day-to-day operations of the Com-
pany and play a key role in the delivery 
of strategic objectives of Federal Grid 
Company.

The Federal Grid’s Articles of Associa-
tion set the competence of the executive 
bodies and provide for their accountability 
to the Board of Directors and the General 
Meeting of Shareholders.

Changes to the membership of the Management Board in 2014 

On 24 October 2014, the Board of 
Directors decided to terminate 
the authorities of the following 
members of the Federal Grid’s 
Management Board: Leonid 
Mazo, Valery Sedunov and 
Vladimir Shukshin (Minutes No. 
233 dated 27 October 2014).

New members of the Management 
Board were elected: Alexander 
Vasiliev, Alexander Zaragatsky, 
and Nikolay Pozdnyakov. 

Andrey  
Murov 

Valery  
Goncharov 

Andrey  
Kazachenkov 

•  Chairman of the 

Management Board, 
member of the Federal 
Grid’s Board of Directors 

•  Management Board 
member since 2012 

•  First Deputy Chairman of 
the Management Board 

•  First Deputy Chairman of 
the Management Board 

•  Management Board 
member since 2013 

•  Management Board 
member since 2010 

Areas of Responsibility: 

Areas of Responsibility:

Areas of Responsibility:

Managing the day-to-day operations 
of the Company, leading the work of 
the Management Board 

Born in 1970

In 1993, graduated from St Peters-
burg State University with a degree 
in Jurisprudence; in 1998, took a 
special retraining course in Financial 
Management at the Inter-disciplinary 
Institute of Advanced Training and 
Retraining for Executives. In 2009, 
graduated from the State Universi-
ty of Civil Aviation with a degree in 
Freight Regulation and Air Transport 
Management. PhD in Economics 

Experience:

2007-2012 – General Director of 
JSC Pulkovo Airport

2012-2013 – Deputy General 
Director, Acting General Director, 
Executive Director, member of the 
Management Board of JSC Holding 
of the Inter-regional Distribution Grid 
Companies (since 04.04. 2013 – JSC 
Russian Grids)

since 2013 – Chairman of the 
Management Board of Federal Grid 
Company 

Positions in governing bodies of 
other organisations:

Member of the Board of Directors of 
JSC Russian Grids and JSC INTER 
RAO UES 

H o l d s n o s h a r e s i n t h e 
C o m p a n y

Developing customer relations 

Managing telecommunications and 
information technologies 

Economics and Finance, property 
management, managing subsidiaries 
and associates 

HR management and development 

Investment planning and procure-
ment 

Born in 1980

Engineering, construction and re-
construction 

Born in 1963

In 1987, graduated from Leningrad 
Shipbuilding Institute. PhD in Eco-
nomics. 

Experience:

2006-2012 – Deputy Director for 
Economics and Finance of JSC Ro-
szheldorproject 

2012-2013 – Deputy Chairman of 
the Management Board of Federal 
Grid Company 

since 2013 – First Deputy Chairman 
of the Management Board of Federal 
Grid Company 

H o l d s n o s h a r e s  i n t h e 
C o m p a n y

Graduated from St Petersburg State 
Engineering and Economic Univer-
sity with degrees in Management 
and Economics and Management in 
Engineering Industry. Received an 
MBA at the University of Wisconsin 
(Madison, USA) and was trained at 
the IMD (Switzerland) and INSEAD 
(France) business schools under 
special programmes in Economics 
and Finance. 

Experience: 

2009-2012 – Deputy Chairman of 
the Management Board of Federal 
Grid Company 

since 2012 – First Deputy Chairman 
of the Management Board of Federal 
Grid Company 

Positions in governing bodies of 
other organisations:

member of the Board of Directors of 
JSC Non-Government Pension Fund 
of the Electric Energy Industry 

S h a r e i n t h e  C o m p a n y ’s 
o r d i n a r y  s t o c k :  0 . 0 0 0 5 49 % .

98

99

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Alexander  
Vasiliev

Vladimir  
Dikoy 

•  Deputy Chairman of the 
Management Board 

•  Management Board 
member since 2014 

•  Deputy Chairman of the 

Management Board – Chief 
Engineer 

•  Management Board 
member since 2013

Alexander  
Zaragatsky 

•  Deputy Chairman of the 
Management Board 

•  Management Board 
member since 2014 

Nikolay  
Pozdnyakov 

Maria 
Tikhonova 

Dmitry  
Shishkin 

•  Deputy Chairman of the 
Management Board 

•  Management Board 
member since 2014

•  Deputy Chairman of the 
Management Board 

•  Management Board 
member since 2013 

•  Internal Control Director 

•  Management Board 
member since 2013

Areas of Responsibility:

Areas of Responsibility:

Areas of Responsibility:

Areas of Responsibility:

Areas of Responsibility:

Areas of Responsibility:

Security issues

Born in 1958 

In 1982, graduated from Leningrad 
Mechanical Institute with a degree 
in Mechanical Engineering; in 2003, 
graduated from St Petersburg 
State University of Economics and 
Finance with a degree in Econom-
ics; in 2007, graduated from St 
Petersburg Institute of Foreign 
Economic Relations, Economics 
and Law with a degree in Jurispru-
dence

Experience:

2003-2010 – Head of Moscow 
Region Department of the RF State 
Committee for Control over Drug 
and Psychotropic Trafficking 

2010-2011 – Deputy Director, 
Director of Security Department of 
JSC MMC Norilsk Nickel

2011-2014 – Deputy Head of the 
Federal Customs Service 

since 2014 – Deputy Chairman of 
the Management Board of Federal 
Grid Company 

H o l d s n o s h a r e s  i n  t h e 
C o m p a n y

Maintenance and Repairs 

Born in 1954

In 1981, graduated from Moscow 
Power Engineering Institute with 
a degree in Electric Power Supply 
of Industrial Enterprises, Cities 
and Agriculture. PhD in Technical 
Sciences. 

Experience:

2008-2009 – Deputy Director Gen-
eral for Production of JSC Glavset-
service of UNEG

2010-2013 – Deputy Chief Engineer 
of Federal Grid Company

Legal and general administrative 
matters 

Engineering, construction and 
reconstruction 

Born in 1976 

Born in 1979

In 2001, graduated from St Peters-
burg Law Institute of the General 
Prosecutor Office with a degree in 
Jurisprudence; in 2002, graduated 
from St Petersburg Institute for 
Management and Economics with 
a degree in State and Municipal 
Management. PhD in Economics 

Experience:

2007-2013 – Chief of Staff of the 
Chairman of St Petersburg Legisla-
tive Assembly 

Graduated from Moscow State Uni-
versity with a degree in Physics and 
Higher School of Economics with a 
degree in Economics

Experience:

2009-2013 – Head of Investment 
Project Monitoring, Head of Invest-
ment Planning and Reporting De-
partment of Federal Grid Company 

2013-2014 – Deputy General 
Director for Investments of JSC 
Russian Grids 

Corporate governance 

Born in 1980 

Graduated from Volga-Vyatka 
Academy of Public Service with 
a degree in Public and Municipal 
Administration, Higher School of 
Economics with MBA Finance. PhD 
in Economics. 

Experience:

2008-2012 – Head of Corporate 
Management and Economic Analy-
sis Unit of the Department, Direc-
tor of the Department for Economic 
Regulation and Property Relations 
in the Fuel and Energy Complex of 
the Russian Ministry of Energy 

since 2013 – Deputy Chairman of 
the Management Board – Chief 
Engineer of Federal Grid Company

since 2013 – Deputy Chairman of 
the Management Board of Federal 
Grid Company

since 2014 – Deputy Chairman of 
the Management Board of Federal 
Grid Company

since 2013 – Deputy Chairman of 
the Management Board of Federal 
Grid Company

H o l d s n o s h a r e s i n t h e 
C o m p a n y

Positions in governing bodies of 
other organisations:

Chairman of the Board of Directors 
of JSC Mobile Gas Turbine Electric 
Power Plant and JSC Dalenergo-
setproekt 

member of the Board of Directors 
of JSC Electrosetservice of UNEG 
and JSC Tomsk Trunk Grids 

S h a r e i n t h e C o m p a n y ’s 
o r d i n a r y s to c k : 0 . 0 0 0 0 2 2 %

Positions in governing bodies of 
other organisations:

General Director of JSC Centre 
for Engineering and Construction 
Management of UES

S h a r e i n t h e C o m p a n y ’s 
o r d i n a r y s t o c k : 0 . 0 0 0 0 9 3 8 %

H o l d s n o s h a r e s i n t h e 
C o m p a n y

Internal Control and Risk Manage-
ment 

Operational controlling and compli-
ance procedures 

Born in 1967. 

In 1992, graduated from the Higher 
School of the KGB of the USSR 
named after Dzerzhinsky with a 
degree in Jurisprudence 

Experience:

2009-2012 – Deputy Director for 
Security of Gazprom EP Interna-
tional Services B.V., Moscow

2013 – Security Director of JSC 
Moscow Unified Electric Grid 
Company

since 2013 – Internal Control Di-
rector of Federal Grid Company 

Positions in governing bodies of 
other organisations:

member of the Board of Directors 
of JSC Energostroysnabkomplekt 
and JSC Centre for Engineering 
and Construction Management of 
UES 

H o l d s  n o s h a r e s i n  t h e 
C o m p a n y

100

101

In 2014, there were no dealings in the Company’s shares by the members of the Management Board.

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Activities of the Management Board in 2014 

In 2014, all KPIs were met, and conse-
quently, quarterly and annual bonuses for 
the Management Board members were 
100% of those determined by employment 
agreements

65

meetings of the 
Management Board 
were held in 2014, 
 of which 

752

matters of the day-to-
day operations of Federal 
Grid were considered 

joint presence 

8 in the form of 

In order to improve the Federal Grid’s 
internal efficiency and minimise the impact 
of risks that can affect the Company’s 
performance, in the reporting year the 
Management Board approved an Action 
Plan (‘road map’) for ensuring financial 
stability and improving economic efficiency 
of the Company’s operation for 2014-2015, 
which includes, among other things, a set 
of crisis response measures. 

The Management Board has devoted its 
special attention to managing subsidiar-

ies and associates. To set a unified policy 
for managing subsidiaries and associ-
ates, all matters of business planning 
and main areas of the development 
strategies of subsidiaries and associates 
for 2014-2018 have been preliminarily 
considered by the Management Board. 
Following changes in the Russian corpo-
rate legislation, in order to set a unified 
approach, the Management Board ap-
proved standard Articles of Association 
for a subsidiary whose voting shares are 
100% owned by Federal Grid. 

In the reporting year, the Management 
Board continued to monitor the imple-
mentation of the technical maintenance 
and repair programme, as well as the 
programme for managing the Company’s 
non-core assets. 

Besides, the Management Board has made 
decisions on charitable assistance and has 
considered matters of social assistance to 
Federal Grid’s employees. 

Remuneration of the Management Board 

In accordance with the Regulations 
on Terms and Conditions of Employ-
ment Agreements and Determination 
of Remuneration and Compensation for 
Senior Managers of Federal Grid Com-
pany approved by the Board of Directors 
on 17 June 2010, remuneration for senior 
managers is determined by their employ-
ment agreements. Remuneration includes 
a fixed component (salary) and a variable 
component (bonuses). Bonuses are tied 
to key performance indicators (KPIs) of 
senior managers. 

In 2014, the Board of Directors approved 
the Methodology for Calculation and Eval-
uation of Key Performance Indicators for 
Federal Grid’s Senior Management that 
included KPI targets for 2014. 

The major changes to the 2014 Methodol-
ogy compared with the same methodology 
for the prior year were as follows:

1. The Methodology was developed in line 
with the provisions of the KPI Guidance 
for state-owned corporations, com-
panies, unitary enterprises, as well as 
business entities where the Russian 
Federation or a subject of the Russian 

Federation has a majority interest 
(issued pursuant to the Assignment of 
the RF President No. Pr-1474 dated 5 
July 2013). In accordance with the above 
Guidance, the following mandatory 
indicators were included in the Method-
ology: ROIC (return on invested capital) 
and TSR (total shareholder return). The 
last one was indicative in 2014 and was 
not included in the senior management 
bonus plan. 

2. Pursuant to the decision of the Federal 
Grid’s Board of Directors (Minutes No. 
303 dated 5 November 2013), an indica-
tor was included in the Methodology for 
measuring reliability of services provid-
ed. The target value was set in accord-
ance with the Order of the Federal Tariff 
Service No. 486-e/3 dated 28 December 
2012. 

3. Pursuant to the assignment of the 

Russian Government (Directive No. 
5533p-P13 dated 17 September 2013) and 
the decision of the Federal Grid’s Board 
of Directors (Minutes No. 207 dated 16 
December 2013), an annual indicator 
Meeting Deadlines for Technological Con-
nection was included in the Methodology. 

4. In accordance with the Development 

Strategy for the Russian Electric Grid 
Complex approved by the Russian 
Government (Resolution No. 511-r dated 
3 April 2013), the following indicators 
were included in the Methodology: 
Reduction in Unit Investment Costs, 
Reduction in Operational Expenditure, 
and Preventing Increase in the Number 
of Injured in Accidents.

5. In order to improve the operating con-
trol over the Company’s activities, we 
have changed the annual and semi-an-
nual senior management bonus plan to 
the quarterly and annual bonus plan.

In case any of the KPIs is not met, then the 
bonuses of all members of the Manage-
ment Board, including the Chairman, are 
decreased by a certain percent depending 
on the indicator significance level. The 
most significant quarterly KPIs are No ma-
jor accidents (40% weighting) and Prevent-
ing Increase in the Number of Injured in 
Accidents (40% weighting). The most sig-
nificant annual KPIs, with a 15% weighting 
each, are ROIC, Electric Energy Losses, 
Achieving Reliability Level of Services, and 
Meeting Schedules for Commissioning. 

Quarterly KPI

2013 
actual

2014
target

2014 
actual

quarterly 

1 quarter

2 quarter

3 quarter

4 quarter

Reliability indicator: no major accidents 

0 per year

0

0

0

0

0

Preventing Increase in the Number of Injured 
in Accidents

-

no 
increase 

no 
increase

no 
increase

no 
increase

no 
increase

Financial stability indicator. i.e. the financial 
leverage ratio

0.33
first half of 
the year

0.44
second half 
of the year

≤ 1.5 or a value 
determined in 
business plan 

0.44

0.43

0.43

0.44

Annual KPI

2013 
actual

2014 
target

2014
 actual

Indicative indicator: TSR (Total Shareholder Return) 

ROIC (Return on Invested Capital) 

Cost reduction for the acquisition of goods (work. services)

Reduction in operational expenditure 

Electricity losses 

Achieving reliability level of services 

Reduction in unit investment costs 

Meeting schedules for commissioning 

Meeting deadlines for technological connection 

-

-

10.25%

-

4.28% 
of supply

-

-

99.6%

-

≥ of average value 
of MICEX index PWR 
(3.08 %)

- 50.5%

≥ 1 
(0.9 % under business 
plan)

1.77 
(1.6% under business 
plan)

≥ 10%

≥ 15%

18.49%

21.7%

≤  100% 
(4.34% of supply)

95.16% 
(4.13% of supply)

1

≥ 10%

≥ 95%

≤ 1

1

17.03%

100.9%

0.72

Remuneration of members of the Management 
Board in 2014, RUB thousand 

Remuneration of the Chairman of the 
Management Board in 2014, RUB thousand

all members including 
Chairman*

Chairman of the 
Management Board 

Remuneration for contributions to the 
Management Board’s operations

0

Remuneration for contributions to the 
Management Board’s operations

Salary

Bonuses

Commission

Benefits

Reimbursement of expenses

93,344

Salary

140,152

Bonuses

0

0

0

Commission

Benefits

Reimbursement of expenses

Other types of remuneration

32,438

Other types of remuneration

Total

265, 934

Total

0

26,506

33,724

0

0

0

15,007

75,237

* Including remuneration paid to all members of the Management Board in 2014 
taking into account changes in the composition of the Management Board.

102

103

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM Audit Commission 

The Audit Commission is a permanent 
body which is elected annually by the 
General Meeting of Shareholders and is 
responsible for exercising control over 
the Company’s financial and operational 
activities, its governing bodies and struc-
tural units. 

In its operations, the Audit Commission 
is governed by the Articles of Association 
and the Regulations on the Audit Commis-
sion of Federal Grid Company.

The main tasks of the Audit Commission 
are as follows:

•  confirmation of the reliability of data 
contained in the Company’s annual 
report, accounting balance sheet, and 
profit and loss statement;

•  analysis of the Company’s financial 
position, identification of ways for 
improving the financial position of the 
Company, and developing recommenda-
tions to the governing bodies;

•  organisation and performance of audits 
(revisions) of the Company’s financial 
and operational activities.

Members of the Audit Commission 

Elected by the Annual General Meeting of Shareholders on 27 June 2014 

Name

Year of birth 

Education

Position

Nikolay Varlamov 

1974

Higher 

Deputy General Director for Control and Audit of JSC Russian Grids 

Anna Drokova

Marina Lelekova

Vladimir Skobarev 

Alan Khadziev 

1985

1961

1952

1981

Higher 

Head of the Department of organisations of Fuel and Energy Sector of the 
Department of Property Relations and Privatisation of the Federal Agency of State 
Property Management

Higher 

Head of the Control and Internal Audit Department of JSC Russian Grids 

Higher 

Director General of MOORE STEPHENS RUS, Ltd

Higher 

Director on Internal Audits of JSC Far East Energy Management Company

Current members of the Audit Commission hold no shares in Federal Grid Company and hold no positions in the Company’s governing bodies.

Acting from 11 November 2013 to 27 June 2014 

Name

Year of birth 

Education

Position

Anna Drokova

Leonid Naganov 

Karim Samakhuzhin

Vladimir Khvorov 

Anna Nesterova

1985

1972

1988

1947

1982

Higher 

Head of the Department of organisations of Fuel and Energy Sector of the 
Department of Property Relations and Privatisation of the Federal Agency of State 
Property Management

Higher 

Minister of Energy of Moscow Region

Higher 

Higher 

Higher 

Deputy Head of the Secretariat of the Chairman of the Board of Directors of JSC 
Russian Grids

leading expert of the Department of state regulation of tariffs infrastructural 
reforms and energy efficiency of the Ministry of Economic Development of Russia 

Deputy Director for Social Projects branch of Non-Profit Autonomous 
Organisation Agency for Strategic Initiatives

Former members of the Audit Commission held no shares in Federal Grid Company and held no positions in the Company’s governing bodies.

Remuneration of the Audit Commission members

The amount of and the procedure for 
paying remuneration and compensation 
to the members of the Audit Commission 
of Federal Grid Company are established 

by the Regulations on Remuneration and 
Compensation to Members of the Audit 
Commission of Federal Grid Company ap-
proved by the General Meeting of Share-
holders on 30 June 2008.

The total remuneration paid to the mem-
bers of the Federal Grid’s Audit Com-
mission in 2014 amounted to RUB324.0 
thousand. 

Auditor

Federal Grid Company annually engages an external independent auditor to perform a statutory audit of its RAS and IFRS financial 
statements.

Auditor Selection Process 

Tendering 
Commission

Audit 
Committee 

Board of 
Directors 

General Meeting 
of Shareholders 

Evaluates bids 
submitted by audit 
organisations and 
selects a winner of 
open tender 

Evaluates a 
candidate for 
the position of 
the Company’s 
auditor and makes 
recommendations 
to the Board of 
Directors 

Members of the 
Committee sit 
in the Tendering 
Commission 

Approves an 
external auditor 

Makes a decision 
on the proposal 
of a candidate for 
an approval of the 
General Meeting of 
Shareholders 

On 27 June 2014, the General Meeting of 
Shareholders approved RSM Top-Audit 
LLC (renamed RSM RUS LLC on 20 August 
2013) to conduct an independent audit of 
the Company’s accounting statements 
prepared under RAS, and the consolidat-
ed financial statements prepared under 
IFRS. RSM RUS LLC is a full member of 
the leading international auditing and 
consulting organisation RSM Internation-
al and a member of the self-regulatory 
organisation of auditors, Non-Profit 
Partnership Auditor Association Sodru-
zhestvo.

The candidate for the position of the Com-
pany’s auditor was proposed based on the 
results of the open tender conducted un-
der the Federal Law “On Placing Orders 
for Goods, Works and Services for State 
and Municipal Needs” No. 94-FZ dated 21 
July 2005. 

We used the selection criteria that are 
provided by the above mentioned Law and 
the Russian Government Resolution No. 722 
dated 10 September 2009 “On the Rules for 
Evaluating Bids under Tenders for Procure-
ment of Goods, Works and Services”.

In the execution of the decision made by 
the Federal Grid’s Board of Directors on 
30 December 2014 (Minutes No. 245 dated 
31 December 2014), JSC Russian Grids 
will conduct a centralised procurement of 
services on performing a statutory audit 
of the Federal Grid’s accounting state-
ments prepared under the Federal Law 
No. 402-FZ dated 06 December 2011 ”On 
Accounting”, and IFRS consolidated finan-
cial statements of Federal Grid Group, for 
2015, 2016 and 2017.

Auditor Remuneration 

The amount of remuneration of the Auditor RSM RUS LLC paid for the auditing the Company’s financial statements under RAS and 
IFRS for 2014 was RUB13,887.5 thousand including VAT.

During the reporting period, the external auditor did not provide any non-audit services to the Company.

104

105

CORPORATE GOVERNANCE / GOVERNANCE SYSTEM CONTROL SYSTEM 

INTERNAL CONTROL AND RISK 
MANAGEMENT SYSTEM

Comprehensive Approach to Control   
and Risk Management 

The internal control and risk management 
system of Federal Grid Company is an 
important component of the Company’s 
governance system. It includes a set of 
procedures, methods and tools used by 
the authorised bodies and employees and 
aimed at obtaining reasonable assurance 
that the Company achieves its objectives in 
the following areas: 

•  Effectiveness and efficiency of activity 

arrangements 

•  Compliance with applicable legislation 

and internal regulations of the Company 

•  Prevention of illegal actions of employ-

ees and third parties with respect to the 
Company assets 

•  Accuracy, completeness and timeliness 
of all types of the Company reporting. 

To ensure the effective operation of the 
internal control system (ICS) in compliance 
with the best international practices, the 
Board of Directors approved the Regula-
tions on Internal Control System of Federal 
Grid Company (Minutes No. 170 dated 3 
August 2012). 

management system is to reduce risks to 
an acceptable level set by the Company’s 
Management Board. Federal Grid’s Risk 
Management Policy is aimed at improv-
ing the Company’s short and long-term 
performance, as well as ensuring the 
sustainable and continuous operation 
and development of the Company through 
the timely identification, assessment 
and treatment of risks that threaten its 
efficient economic operation and good 
standing, the health of its employees, the 
environment and the property interests of 
shareholders and investors.

The Procedure for Applying the Risk Man-
agement Policy provides for the following 
risk response strategies (risk manage-
ment practices):

The above Regulations set the objectives, 
tasks and operating principles of the Inter-
nal Control System, as well as the struc-
tural components of the internal control 
framework including the risk management 
system. According to the Regulations, the 
risk management system includes: 

•  analysis of business processes aimed 
to identify events that can negatively 
affect the achievement of the Compa-
ny’s objectives; 

•  risk assessment with regard to their 

significance and probability;

•  Risk mitigation.

•  Risk acceptance.

•  planning of risk treatment actions.

•  Risk transfer (for example, insurance).

Our risk management framework is 
documented through a comprehensive 
set of internal documents of Federal Grid 
Company, including the Risk Management 
Policy and the Procedure for Applying the 
Risk Management Policy. 

In accordance with the Risk Manage-
ment Policy, a major objective of the risk 

•  Risk aversion.

•  Combined strategies.

The choice of risk response strategy is 
within the competence of an appropriate 
risk owner. Strategy types (risk manage-
ment practices) shall be approved by the 
Company’s Management Board. 

Roles and Responsibilities of the Participants of the Internal Control System 

Audit Commission 

•  Confirms the reliability of data contained in the Company’s annual report, accounting balance sheet, and 

profit and loss statement; performs audits of the Company’s financial and operational activities

Board of Directors 

Audit Committee 

•  Builds up the Internal Control System, sets its policy and monitors performance of the ICS, considers 
results of the internal control, performs regular evaluation of the ICS’s effectiveness and ensures 
constant improvement of the internal control procedures 

•  Carries out reviews of the Company’s Internal Control System, develops recommendations to the Board 
of Directors on its further improvement; plans the internal audit schedule and considers audit results; 
performs the Company’s financial statement analysis and the analysis of the external audit results; 
assesses candidates for the position of the Company’s auditor, develops recommendations to the Board 
of Directors regarding the appointment of external auditors, the conduct of annual independent audit and 
external auditors’ fees 

Chairman of the Management 
Board 

•  Provides organisational support and scheduling of internal controls, makes decisions based on the 
outcomes of the controls; makes proposals to the Board of Directors regarding the improvement of 
internal control procedures 

Internal Control and Risk 
Management Department 

•  Plans and performs audits of business processes, governance system, internal control and risk 

management system, and organisation design of the Company and its subsidiaries and associates 

•  Plans and performs audits of financial and operational activities of the Company and its subsidiaries and 

associates

•  Plans and performs construction audit and review of projects within the Company’s investment 

programme

•  Analyses risks and operational and investment efficiency enhancement potentials in the course of long-

term planning of operating and investing activities.

•  Organises effective internal control and risk management system, evaluates the effectiveness of risk 

management in the Company and its subsidiaries and associates.

•  Plans and conducts audit of information systems, identifies and assesses risks of IT Strategy 

implementation and operation.

Other units that perform control 
functions 

•  The Corporate Headquarters performs strategic, guidance and control functions subject to the 

Company’s HR Management Policy 

•  Pursuant to the Order No. 180 dated 10 April 2014 “On the Organisational Structure of the Corporate 
Headquarters”, members of the Management Board and Deputy Chairmen of the Management Board 
perform activity-specific control functions with respect to the Federal Grid branches, subsidiaries and 
associates

Owners of Control Procedures 

•  Organise and implement control procedures within business processes in accordance with job 

descriptions and provisions of the Company’s regulatory and administrative documents

Roles and Responsibilities of the Participants of the Risk Management System 

Management Board 

•  Considers and approves a Risk Matrix, Risk Summary and risk minimisation actions 

Risk Owners  
members of the Management Board, Deputy 
Chairmen of the Management Board and the 
Heads of the Company’s structural units

•  Ensure efficient risk management including risk identification and assessment, and provision in the 
budget and business-plans of the amounts required for financing the risk management actions 

Owners of Control Procedures  
Staff of the Company’s structural units 

•  Organise and implement control procedures within the business processes 

•  Identify and assess risks, plan and implement measures on reducing risk probability and/or risk 

implications

Internal Control and Risk 
Management Department 

•  Plans and performs internal audit of the risk management system

•  Analyses risk factors and operational and investment efficiency enhancement potentials in the 

course of long-term planning of operating and investing activities

•  Organises the risk management system and evaluation of its efficiency

106

107

CORPORATE GOVERNANCE / CONTROL SYSTEMInternal Audit

Plans for 2015

The Federal Grid’s internal audit function 
is performed by the Internal Control and 
Risk Management Department (Internal 
Auditor) in accordance with the Federal 
Grid’s Internal Audit Guidelines approved 
by the Internal Control Director. 

In accordance with the professional 
standards of the Institute of Internal Audi-
tors, the Programme has been developed 
in the Company for assessing and improv-
ing the internal auditing, which establish-
es the procedure for ongoing monitoring, 
periodic internal assessments (self-as-

sessments) and preparation for external 
assessment of the performance of the 
internal audit activity, and includes a set 
of measures for developing the internal 
audit, including:

•  Changing organisational and functional 

model 

•  Improving the internal audit procedures 

•  Stakeholder engagement 

•  Automation of the internal audit activity 

•  Maintaining qualification and developing 

competencies of internal auditors 

In addition, the above Programme 
provides for drafting the Federal Grid’s 
Internal Audit Policy with its further 
approval by the Board of Directors. The 
Policy should set, in accordance with the 
Corporate Governance Code recommen-
dations, the internal auditor status within 
the Company (including functional and 
administrative reporting lines), scope of 
activity (including the existing restric-
tions), and internal auditor rights and 
obligations. 

What important innovations 
were implemented in 2014 in 
the area of internal control of 
Federal Grid Company? 

Within the implementation of the 
above Programme we have drafted 
policies and guidelines such 
as Internal Control Policy, Risk 
Management Policy, and Internal 
Audit Policy. The above drafts 
cover the provisions of the Russian 
Corporate Governance Code and new 
requirements of the Listing Rules 
of the Moscow Stock Exchange. 
The Management Board and the 
Audit Committee considered the 
draft documents and recommended 
them for approval by the Board of 
Directors.”

“The successful delivery of the 
Company’s long-term strategy 
depends largely upon the 
effectiveness of our internal control. 
Therefore, in 2014 we developed a 
Programme for enhancing the quality 
of the internal control system. The 
Programme includes measures 
aimed at improving not only internal 
control but also internal audit 
function, risk management system 
and control environment of business 
processes. 

Dmitry Shishkin 
Internal Control Director 
Member of the Management 
Board of Federal Grid 
Company 

Highlights of 2014 

•  Internal assessment of the effective-

ness of the internal control system was 
performed; the system weaknesses and 
risks were identified. The results were 
reviewed by the Audit Committee (Min-
utes No. 33 dated 28 November 2014).

•  Review of the risk management system 
was conducted within the preparation of 
Key Risk Report 2013. Upon consideration 
of the Report, the Management Board 
made decisions aimed at improving the 
efficiency of the risk management in the 
Company (Minutes No. 1239 dated 06 
June 2014).

Board of Directors and Risk Management in 2014 

Upon the preliminary 
consideration by the 
Management Board and the 
Audit Committee, the Board 
of Directors approved the Key 
Operational Risk Register 
(Minutes No. 248 dated 27 

January 2015). The Register 
aims to integrate the risk 
management system into the 
business planning system of 
Federal Grid Company, which 
will be implemented in 2015. 

When making efforts toward further 
developing and improving the internal 
control and risk management system we 
will take into account the results of the 
implementation of the assignments of 

the RF President No. Pr-3013 dated 27 
December 2014 and of the RF Govern-
ment No. ISH-P13-54 dated January 13 
2015 on drafting a list of the Company’s 
internal documents that regulate, among 

other things, internal audit functions, risk 
management system and quality control 
system, as well as guidelines for drafting 
the above documents and a schedule for 
their approval.  

Key Risk Factors and 
Information about Risk 
Management Actions 

Level of risk  
relevance

Risk relevance trend  
in the reporting year

Critical

Higher relevance

Significant

Moderate

Lower relevance 

Relevance unchanged 

Risk

Risk Description

Risk Mitigation Actions (control procedures)

Industry risks

1 Tariff regulation 

risks

Risk Relevance 
and Its Trend 

•  The amount of investable funds in 
the tariff was reduced relative to 
the tariff sources of funds for the 
Company’s Investment Programme 
that has been taken into account 
when tariffs for electricity 
transmission were approved. 
The reduction was caused by an 
increased cost of debt

•  Actual revenues from electricity 

transmission services were lower 
due to a changed order of payment 
for services; this change had not 
been taken into account when 
tariffs were set 

-  Draft proposed changes to the corporate Investment Programme and the 
structure of sources of financing and changes in the structure of tariff 
decision in terms of tariff sources of financing for the corporate Investment 
Programme.

-  Draft and submit proposed amendments to laws and regulations on tariff 

setting and on defining indicators that are used in setting the tariffs, including 
proposals about the procedure of payment for electricity transmission services 
by the customers (the way customers pay for the reserved maximum capacity) 
and other changes.

-  Given the current macroeconomic parameters, and in order to minimise the 
impact of the abovementioned risks the Company is working on proposals to 
include lost revenues (caused by a reduced volume of services and increased 
costs of electricity transmission services via foreign energy systems) in the 
gross revenues. These proposals will be submitted to the Federal Tariff 
Service.

•  The costs of electricity transmission 
services via foreign energy systems 
increased due to changes of foreign 
currency rates 

-  Implement actions targeted at improving the efficiency of the Company’s 
operations and investments, consistent implementation of the approved 
parameters of RAB regulation and at drawing up well-balanced and 
economically justified proposals about how to adjust and set these parameters.

•  The actual average tariff on 

-  Improve the quality of budget planning and develop a system of budget 

electricity transmission deviated 
from the one that was included in 
the business plan 

control through improving the corporate Budget Code and integrating the 
risk management processes in the system of medium-term and long-term 
business planning.

108

109

CORPORATE GOVERNANCE / CONTROL SYSTEMRisk

Risk Description

Risk Mitigation Actions (control procedures)

Risk

Risk Description

Risk Mitigation Actions (control procedures)

2 Risks related to 
technological 
connection 

Risk Relevance 
and Its Trend 

•  Risks related to the untimely 

meeting of contractual obligations 
under contracts for technological 
connection, including deviation 
of the actual quality level of the 
technological connection services 
from the level established during 
tariff regulation. The quality level 
is measured as per Section 3 of 
Executive Order No. 718 dated 
14 October 2013, issued by the 
Ministry of Energy, as the aggregate 
impact by the quality parameters 
of reviewing applications for 
technological connection; execution 
of contract for technological 
connection, compliance with the 
antimonopoly legislation and the 
quality of customer service

Federal Grid Company’s Management Board approved the Programme for 
Improving the Efficiency of Technological Connection to Electric Grids of Federal 
Grid Company and Increasing Transformer Capacity Utilisation. It includes 
actions targeted at initiation of amendments to the Russian laws (law-making) 
and organisational actions.
Law-making activities in the context of these risks include the drafting of 
proposed amendments to laws and regulations that govern relations of the 
parties in the process of technological connection (including those that regulate 
the fundamentals of pricing when individual tariffs for technological connection 
are set) and responsibility of grid organisations and counterparties for complying 
with the material terms and conditions of contracts for technological connection. 
These proposals are to be communicated to the regulators (the Federal Tariff 
Service and Ministry of Energy).
Institutional actions of the Programme are targeted at improving the efficiency of 
Federal Grid’s operations when the Company provides technological connection 
services if tariff sources of financing are insufficient, including:
-  Drafting and implementation of template documents in order to unify the 
document flow in the process of technological connection of customers 
-  Actions to increase capacity utilisation by identifying equipment which is 

•  Insufficient sources of financing of 

technological connection operations 

not consistent with UNEG criteria and by identifying and decommissioning 
inefficient capacities 

3 Risks related 
to an increase 
of overdue and 
bad accounts 
receivable 

•  Deviation of overdue accounts 

receivable for electricity 
transmission services from the 
amount established in the business 
plan 

Risk Relevance 
and Its Trend 

-  Drafting of template case proposals about consumer co-financing of 

operations related to technological connection, except the fee for technological 
connection (upon agreement with the customers)

-  Setting of schedules for completion of procedures by the Company’s structural 

units and implementation of actions to improve control over scheduled 
deadlines at all stages of business process, from registration of an application 
for technological connection to full performance of contractual obligations

Information about transformer capacity which is free for technological connection 
of customers and generation facilities in all main substations is monitored and 
updated in order to make it more transparent; this information is made available 
on the corporate website.

In order to mitigate risks related to an increase of overdue and bad accounts 
receivable the Company approved the Receivables and Payables Management 
Procedure. It establishes the procedures of taking decisions about accounts 
receivable by contract managers. Besides, the Receivables and Payables 
Management Committee has been established and is operating. Its goals are to 
make cash management in the Company more efficient, manage risks related 
to overdue accounts receivable and payable, and improve cash turnover. The 
Committee responsibilities include but are not limited to the following issues:
-  Review aggregate reports about the status of accounts payable and receivable 

and explanatory notes of contract managers

-  Take decisions about ways of recovering accounts receivable that have been 
overdue for more than three months and accounts receivable that were 
submitted for the Committee’s decision by contract managers

-  Take decisions to write off bad debt 
-  Selectively assess the performance of employees who manage accounts 

payable and receivable 

Take decisions that proposals about disciplinary measures against delinquents 
should be brought for approval by the Chairman of the Management Board in 
cases when the procedure of handling overdue accounts payable and receivable 
is breached. 

Country and regional risks

Unexpected political events in 
2014 include the government crisis 
in Ukraine, followed by armed 
hostilities in that country and 
increased tensions in relations 
between Russia and the USA and 
many EU members. Economic 
sanctions against Russia brought 
about substantial deterioration on the 
capital and bank debt markets, and 
could cause problems with entering 
into new contracts with companies 
from these countries. The overall 
economic environment also changed 
unexpectedly in 2014. The most 
significant changes were a rapid drop 
in oil prices and devaluation of the 
ruble on the background of rising 
inflation. In the context of (and, to 
some extent, in relation to) political 
developments these changes began 
making a moderate financial effect on 
the Company’s operations toward the 
end of the reporting year. 
The combined impact of political and 
economic factors brought about a 
regulatory risk. Tariff decisions taken 
in 2014 resulted in a decline of the 
Company’s revenues.

Federal Grid Company has a 
distributed network of structural 
units, and its assets are located on 
the whole territory of the Russian 
Federation. Therefore, risk factors 
for the Company are distribution of its 
facilities and their remoteness from 
repair stations, as well as a possible 
impact of natural events on these 
facilities 

4 Risks related 
to the political 
and economic 
situation in the 
country and 
region

Risk Relevance 
and Its Trend 

Impact of political 
factors

Impact of economic 
factors 

5 Risks related to 
the geographical 
characteristics 
of the country or 
region, including 
an increased 
risk of natural 
disasters 
and possible 
discontinuation 
of transport 
services

Risk Relevance 
and Its Trend 

In order to mitigate the impact of country and regional risks the Company 
approved an Anti-Crisis Programme and cost-cutting programmes in operational 
areas. 
Besides, it drafted a Long-Term Development Programme of Federal Grid 
Company for 2015-2019 with a forecast though 2030. The Programme was 
approved by the Board of Directors and previously approved by the Government 
of the Russian Federation on 25 September 2014. The Log-Term Programme 
priorities are to improve the efficiency of Federal Grid’s operations, reduce 
operational costs by 25% by 2017 and investment costs by 30% relative to the 
2012 level, improve reliability of electric power supply and implement projects 
that are important for the national economy. 
While drafting the Long-Term Programme, the Company analysed risks 
that might affect its operations. It intends to monitor and assess these 
risks continuously. The Long-Term Programme also includes a set of risk 
minimisation measures. 

Federal Grid Company operates in compliance with the Unified Technical Policy 
of the Electric Grid Complex that was approved by the Board of Directors of JSC 
Russian Grids (Minutes No. 138 dated 23 October 2013) and put in place as the 
Company’s internal document by a decision of Federal Grid’s Board of Directors 
dated 27 December 2013 (Minutes No. 208 dated 27 December 2013). 
The aim of the Unified Technical Policy is to identify the key technical areas that 
enhance the electric grid complex’s reliability and efficiency in the short and 
medium terms with an appropriate industrial and environmental safety based on 
innovative principles that provide non-discriminatory access to electric grids for 
all market participants. This includes:
-  An increased number of offroad vehicles and use of air drones in the process 

of operating the overhead lines and arranging post-accident inspections

-  Higher readiness for repair and recovery works 

110

111

CORPORATE GOVERNANCE / CONTROL SYSTEMRisk

Risk Description

Risk Mitigation Actions (control procedures)

Risk

Risk Description

Risk Mitigation Actions (control procedures)

Financial risks

Legal risks

6 Liquidity risk

Risk Relevance 
and Its Trend 

This risk is related to possible losses 
that may be caused by the Company’s 
inability to meet its obligations in full 
due to the following factors: 
•  CBR’s monetary policy
•  Exchange rate fluctuations 
•  Changes of interest rates 
•  Inflationary pressure 

In order to meet its targeted metrics, the Company is implementing an Action 
Programme (“road map”) to ensure financial sustainability and enhanced 
economic efficiency of Federal Grid Company in 2014-2015, including a package 
of anti-crisis actions approved by the Management Board (Minutes No. 1263/2 
dated 10 October 2014). The goals of this Programme are to achieve the best 
balance between objectives of the Company’s investment growth, the level of its 
shareholder value and profitability; ensure financial sustainability; and conduct 
efficient and high-performance business operations.
The Company approved priority objectives of its financial and economic policy for 
2015 and outlined key implementation mechanisms.
In 2014, the Company developed and implemented actions that are included 
in the programmes and have an impact on the outcomes of the Company’s 
operations. These include:
-  Investment Efficiency Programme which envisages a reduction of investment 

costs

-  Programme for Substitution of Imported Equipment, Technologies, Materials 

and Systems for 2015-2019

-  Maintenance and Repair Costs Efficiency Programme 
-  Payroll Efficiency Programme 
-  Programme for Improving Efficiency of Technological Connection to Federal 

Grid’s Electric Grids and Increasing Utilisation Ratio of Transformer 
Capacities. 

The Company also implements other actions to minimise the financial effect of 
the abovementioned factors:
-  It continuously monitors and manages risks related to changes of the 

regulatory framework (this is done by departments of finance and economy)

-  It takes actions to improve management of the Company’s working capital 
and ensure profit from cash flow, including via stronger financial discipline 
of counterparties. The Company also implements its policy which envisions 
gradual reduction of advances paid to contractors

-  Federal Grid Company handles claims and bad debt recovery, and manages 

accounts receivable in order to reduce overdue accounts receivable or prevent 
their accumulation by counterparties.

-  The Company drafts proposals for the federal executive authorities on how 
to change the process of calculation of fines for untimely fulfillment of 
contractual obligation (the CBR key rate should be used for this purpose 
instead of the CBR refinancing rate)

-  The Company conducts negotiations with entities that provide cross-border 

electricity transmission services (Kazakhstan, Belarus, the Baltic countries). 
The aim of these negotiations is to achieve an agreement not to increase the 
cost of transit due to exchange rate changes and synchronyse the parameters 
of tariff indexation between the countries

-  The Board of Directors established a foreign currency limit on FX transactions 

in order to control operations in foreign currency 

7 Legal risks

Risk Relevance 
and Its Trend 

These are risks related to changes 
in legislation and to regulation of 
Federal Grid’s operational areas, 
including but not limited to:
•  relations with other owners of 

UNEG facilities;

•  calculation of the justified value of 

maximum capacity for technological 
connection of applicants;

•  the procedure for defining the 
declared capacity to be used 
for setting of the electricity 
transmission tariffs and calculation 
of service costs;

•  technological connection to the 

Company’s facilities having voltage 
below 110 kW;

•  coordination of electricity market 
participants’ programmes for 
development of the electric power 
industry in the longer term;

•  customers’ liability for the untimely 

payment for services;

•  relations with the third parties in 

technological connection.

•  Risks related to public law and 

pertaining to:

•  changes of court practices on 

issues related to the Company’s 
operations;

•  balance of interests with other 

entities operating in the electric 
power industry

The Company continuously contributes to the drafting of rules and regulations at 
the federal level, takes part in the work of inter-ministry panels on the regulation 
of the electric power industry, and cooperates with the relevant committees of 
the Federal Assembly of the Russian Federation. The following actions were 
taken in the reporting year as part of this work:
-  Federal Grid Company drafted proposed amendments to the Federal Law “On 
Electric Power Industry” (about relations with other owners of UNEG) and 
submitted them to the Russian Ministry of Energy 

-  Federal Grid Company offered proposals to the draft Government resolution 
about introduction of “power grid reserve capacity” and using this concept in 
calculations, and submitted them to the Russian Ministry of Energy. Another 
proposal was to include full costs (including the costs of enhancement / 
development of the existing electrical grid network) in the fee for technological 
connection and extend this principle to all applicants for technological 
connection

-  Based on the Company’s proposals, the Ministry of Energy is drafting 
a Government regulation on extending the list of exceptional cases of 
technological connection to federal Grid’s facilities 

-  The Company contributes to federal executive authorities’ rule-making and 

methodological work on defining a mechanism for the approval and adjustment 
of investment programmes run by the electric power industry entities with due 
regard of the need to comply with the Government Regulation No. 132 dated 16 
February 2015 (on amending Resolution No. 977)

-  Federal Grid’s position on balancing the interests of electric power entities was 

communicated to the State Duma. 

The Company monitors the key trends in court practices pertaining to its main 
operational areas. In the reporting period, there were no changes in the court 
practices on issues related to Federal Grid Company’s core business that could 
have a significant adverse effect on its performance and on the outcomes of court 
trials in which the Company is a party.

Risks related to Federal Grid’s operations

8 Operational and 
technological 
risk

Risk Relevance 
and Its Trend 

This risk is related to high physical 
wear and obsolescence of electricity 
grid assets, violations of service 
conditions and operational regimes 
of electric grid equipment, damages 
of equipment, wrong performance of 
relay protection of automatic controls 
and automatic emergency response 
system, the use of inefficient and 
obsolete technologies and failure to 
implement the repairs programme 
in full.
System-wide interruptions in 
performance and failures to supply 
electricity to customers, either due 
do equipment failures or to natural 
disasters could eventually cause 
significant economic and reputational 
losses for the Company. 
Besides, they could affect the volume 
of losses in its electric grids.

Federal Grid Company operates in accordance with the regulation on the Unified 
Technical Policy in the Electric Grid Complex. The aim of its implementation is 
to enhance the electric grid complex’s reliability and efficiency in the short and 
medium terms with an appropriate industrial and environmental safety based on 
innovative principles of development.
Implementation of the corporate Investment Programme, which includes projects 
(including those that are part of the programme of renovation and comprehensive 
refurbishment of facilities) that aim to achieve the following goals:

•  Reduce the degree of wear of fixed assets
•  Renovate electric grid facilities 
•  Ensure delivery of capacity by power plants and reliability of cross-regional 

electric power exchanges

•  Upgrade switchgear equipment; upgrade and develop automated process 

control systems 

•  Improve grid manageability and observability; clear the routes for overhead 

transmission lines (OHTLs)

•  Improve energy efficiency

–  Expand the pool of backup electric power sources, vehicles and special-

purpose machinery for post-accident repairs 

–  Implement an action plan to prevent an increase of accident rate at high-

voltage lines and substations

–  Maintain the existing number of repair employees that provide maintenance 

and repair of substations and high-voltage lines 

–  Sign contracts for the servicing of substation equipment with the producers of 

electrical equipment 

–  Educate, oversee and certify employees who operate process equipment
–  Conduct emergency response drills and onsite inspections in the Company’s 

branches 

–  Implement the Property Insurance Coverage Programme
–  Oversee operational and technological risks via technical oversight and 
maintaining the quality of construction control which is exercised by the 
Technical Supervision Centre as Federal Grid’s branch 

–  Operations of permanent duty teams in the regions. These teams are to 
conduct emergency and recovery work at the grid facilities. Establish 
emergency reserve of equipment 

See details in Sections: Improving Reliability (p. 27) / Investing Activities (p. 41)

112

113

CORPORATE GOVERNANCE / CONTROL SYSTEMRisk

Risk Description

Risk Mitigation Actions (control procedures)

9 Investment risk

Risk Relevance 
and Its Trend 

Failure to meet the parameters of 
the Investment Programme which is 
approved by the Ministry of Energy 
and taken into account in tariff 
decisions results in a decline of gross 
revenues when tariffs are adjusted 
for the upcoming period of regulation 
(in accordance with the RAB-based 
regulation methodology).
Resolution No. 159 of the Government 
of the Russian Federation (dated 
27 February 2013) “On Making 
Amendments to the Rules of Approval 
of Investment Programmes of 
Electricity Sector Facilities with State 
Participation, and Grid Organisations” 
became effective. This Resolution may 
expose the Company to risks because 
facilities that are not included in the 
regional plans may be excluded from 
this Investment Programme.

Actions to enhance federal Grid’s investments are implemented as part of the 
following programmes: 
-  Investment Efficiency Programme (reduction of investment costs)
-  Programme for Substitution of Imported Equipment, Technologies, Materials 

and Systems for 2010-2014 and 2015-2019.

-  Programme for Improving the Efficiency of Technological Connection to 

Federal Grid’s Electric Grids and Increasing Transformer Capacity Utilisation 

Besides, the Company:
-  Discusses issues of energy policy, reliability of electric power supply and its 

costs with the government bodies and public organisations 

-  Implements measures toward fulfillment of an Action Plan (“road map”) to 

establish and develop mechanisms of public control over natural monopolies 
(in which the power consumers will take part), as approved by Directive No. 
1689-r of the Government of the Russian Federation (dated 19 September 
2013) 

-  Implements an anti-corruption policy in order to avoid exposures to fraud in 
procurement during implementation of the Investment Programme; actions 
are taken to assess the good faith and reliability of counterparties 

See details in Sections: Investing Activities (p. 41) / Procurement (p. 33) /  
Anti-Corruption Activities (p.115)

Tariff risks

 Investment risk

Risks related 
to technological connection

Risks related to an increase 
of overdue and bad accounts 
receivable

Operational and 
technological risk

 Legal risks

Moderate

Significant

Critical

Liquidity risks

Risks related to the geographical 
characteristics of the country or region

ANTI-CORRUPTION ACTIVITIES 
Fighting Corruption Effectively 

We consider corruption to be one of the 
systemic threats to the stability and reli-
ability of the Company’s operations, and 
fighting corruption is among the priority 
tasks of the Long-term Development 

Programme of Federal Grid Company. Our 
anti-corruption activities aim to design 
and implement consistent measures to 
prevent corruption, eliminate or minimise 
its root causes and conditions, to build a 

zero tolerance attitude among employees, 
governing bodies, shareholders, invest-
ment community and counterparties 
towards corruptive practices.

Principles and Tasks of the Anti-Corruption Policy 
of Federal Grid Company 

The implementation of our Anti-Corrup-
tion Policy is based on principles which 
are in line with the best Russian and 
international anti-corruption standards 
and practices.

Following changes in anti-corruption 
legislation in 2014, the Board of Directors 
approved a new version of the Anti-Cor-
ruption Policy of Federal Grid Company.

Main principles

Main tasks 

•  Full compliance of Anti-Corruption Policy with 

•  To ensure compliance with the requirements of 

applicable legislation and generally accepted rules 
•  Strict observance of rights and legitimate interests 
of employees, partners and counterparties when 
implementing anti-corruption measures 

Article 13.3 of the Federal Law “On Anti-Corruption” 
and other laws and regulations in the anti-corruption 
area 

•  To perform compliance control, including anti-

•  A “tone at the top” set by senior managers and 

corruption compliance control 

directors when creating a culture of zero tolerance 
towards corruption and building an anti-corruption 
system 

•  Employee involvement in the design and 

implementation of anti-corruption standards and 
procedures 

•  To establish an effective legal mechanism to prevent 

and fight corruption

•  To establish an effective mechanism for 

implementing measures to prevent and fight 
corruption 

•  To prevent corrupt practices and to ensure liability 

•  Proportionality of anti-corruption procedures and 

for corruption offences 

corruption risks 

•  Liability for corruption of all employees irrespective 
of their position, length of service or other conditions 

•  Continuous control over, and regular monitoring of, 
the effectiveness of anti-corruption standards and 
procedures 

•  To build awareness and uniform understanding 
among employees, shareholders, members of 
the governing and control bodies, partners and 
counterparties of the Company’s position of zero 
tolerance towards corruption in all its forms and 
manifestations 

•  To minimise the risk of the Company’s involvement in 

corrupt activities 

Risks related to the political 
and economic situation 
in the country and region

Implementation of the Anti-Corruption Policy in 2014 

In the reporting year, there were several areas we focused on in further implementation of the Anti-Corruption Policy of Federal Grid Company. 

Automation of activities  

•  In order to computerise the process of 
counterparty verification, we designed 
and commissioned a specialised infor-
mation retrieval system that performs 
an automatic verification in government 
databases. 

•  We conducted training videoconferences 
for the staff of the Corporate Headquar-
ters and branches devoted to anti-cor-
ruption activities, transparency of the 
Company’s business and operations of 
the related computer-aided systems.

114

115

CORPORATE GOVERNANCE / CONTROL SYSTEMAnti-Corruption Measures 

•  In order to implement the assignments 
of the Russian Government aimed at 
ensuring transparency of financial and 
operational activities of Federal Grid 
and its subsidiaries and associates, we 
reported monthly to the Russian Min-
istry of Energy, the Federal Financial 
Monitoring Service (Rosfinmonitoring) 
and the Federal Tax Service of Russia 

all information on the contracts made, 
including the chain of ownership of our 
counterparties; and performed moni-
toring of timely and proper fulfillment 
of the above assignment of the Russian 
Government. 

•  To examine how our employees per-
ceive corruption and understand the 

The efficiency of anti-corruption 
activities of Federal Grid Company 
is achieved by strong teamwork of 
all participants of anti-corruption 
management structure 

Depar tment of Operational 
Control and Compliance

Internal Control 
Director

organises activities that underpins 
the implementation of the Anti-
Corruption Policy, monitors their 
execution 

coordinates 
control functions 
of the Company, 
its branches, 
subsidiaries and 
associates 

Economic effect 
of anti-corruption 
measures  
in procurement  
in 2014 is

RUB

440

mln

Board of 
Directors

determines the Anti-
Corruption Policy 
and monitors its 
implementation 

Chairman of the 
Management 
Board 

is responsible for 
organising the Anti-
Corruption Policy 
implementation 

General Directors 
of branches, 
subsidiaries and 
associates 

are responsible for 
implementing the 
Anti-Corruption 
Policy in branches, 
subsidiaries and 
associates 

Anti-Corruption Policy and to assess 
the effectiveness of its implementation, 
we organised a Company-wide employ-
ee survey. 

•  We monitored the Company’s requests 

for payment under bank guarantees due 
to the failure of its counterparties to 
perform their contracts obligations. In 
2014, 206 requests were submitted for 
the total amount of RUB20.8 billion. 

•  Within the procurement activities in 
2014, we performed an anti-corrup-
tion review of documents under 9,489 
transactions, including procurement 
procedures, followed by specific actions 
aimed at preventing and/or compen-
sating losses and missed profit under 
these transactions.

Central Commission for Compliance 
with Corporate Ethical Standards 
and Resolution of Conflict of 
Interests 

considers issues that relate to the 
observance of the provisions of the Code 
of Corporate Ethics and standards of 
corporate conduct, as well as issues 
relating to resolution of conflict of 
interests 

Development of anti-corruption activities in 2015 

At the beginning of 2015, Federal Grid 
Company joined the Anti-Corruption 
Charter of the Russian Business. The 
Official Certificate (No. 2041 dated 13 
March 2015) was handed to the Federal 
Grid’s representatives at the Interna-
tional Scientific and Practical Confer-
ence “Business and Government against 
Corruption”, organised by the Chamber 
of Commerce and Industry of the Russian 
Federation, the United Nations Office on 
Drugs and Crime, and the International 
Anti-Corruption Academy. 

Following changes in anti-corruption 
legislation and the adoption of the new 
Russian Code of Corporate Governance, in 
2015 our Company plans to implement the 
following measures aimed at improving 
its anti-corruption activities: 

•  Participating in collective anti-corruption 

initiatives 

•  Revising and improving the existing an-
ti-corruption policies and guidelines 

•  Developing a list of corruption risks and 

procedures for their assessment 

•  Training employees on anti-corruption 
procedures, applicable anti-corruption 
legislation and relevant local regulations 

•  Implementing organisational, educational 
and other measures promoting anti-cor-
ruption compliance among employees 

•  Establishing a procedure for specific 

categories of officers to report on all gifts 
received in connection with their official 
position or performance of their official 
duties. 

116

SHARE CAPITAL 

SHARE CAPITAL STRUCTURE 

As of 31 December 2014, the charter cap-
ital of Federal Grid Company amounted to 
RUB637,332,661,531 and 50 kop and was 
divided into 1,274,665,323,063 ordinary 
registered non-documentary shares with 
a nominal value of RUB0.50 each. No 
preferred shared were placed as of the 
above date.

In accordance with the Company’s Arti-
cles of Association, the number of author-
ised shares is 72,140,500,768 ordinary 
registered shares with a nominal value of 
RUB0.50 each and a total nominal value of 
RUB36,070,250,384. Authorised ordinary 
shares offer the same rights as outstand-
ing ordinary shares.

 On 20 February 2014, the additional 
ordinary share issue was completed with 
a price of RUB0.50 per share. During the 
additional issue, 7,524,307,067 shares 
(79.78% of the total number of securities 
of the additional issue to be placed) were 
placed. As a result of the placement, the 
Company received funds in the amount of 
RUB3.762 billion.

The Russian Federation, which was the 
main participant in the additional is-
sue, acquired shares to the amount of 
RUB3.756 billion. The remainder of the 
outstanding shares, in the amount of 
RUB6 million, was acquired by minority 

shareholders. The Company has allocated 
funds received from the additional issue 
for constructing and commissioning elec-
tricity transmission lines to improve the 
reliability of power supply in the Republic 
of Sakha and Buryatia, as well as facilities 
for the Winter Olympics in Sochi.

Share Capital Structure 

The Company has more than 400,000 
shareholders. The JSC Russian Grids, 
which owns 80.6% of the share capital, is 
the Company’s majority shareholder. The 
Russian Federation, represented by the 
Federal Agency for State Property Man-
agement (Rosimushchestvo), owns 0.59% 
of the authorised capital.

In June 2013, JSC Russian Grids and 
Rosimushchestvo signed a sharehold-
ers’ agreement regarding the managing 
and voting in Federal Grid Company. The 
parties have signed the agreement with 
respect to all, present and future, voting 
shares in Federal Grid Company.

The analysis of shareholder register, 
annually performed by the Company to 
improve interactions with shareholders, 
identified the key groups of holders of 
ordinary shares and depository receipts. 
As of the end of 2014, the Company’s free 
float was 18.2%. The main minority share-
holders of the Company are institutional 
investors and holding structures, with 
retail investors accounting for 3.36%.

Share Capital Structure of Federal Grid Company

E

E

A

B

C

D

E

A

B

C

JSC Russian Grids

JSC Russian Grids

80.13%

JSC Centerenergoholding

JSC Centerenergoholding

2.62%

Kopernik Global All-Cap Fund

Kopernik Global All-Cap Fund

1.62%

Index of Energy FGC UES LLC

Index of Energy FGC UES LLC

1.08%

Others

14.55%

D
Others
E

D

C

B

D

C

B

%

80.13%

2.62%

1.62%

1.08%

14.55%

Information is disclosed with the consent of the respective shareholders.

Federal Grid Company management is not aware of any shareholders that hold more 
than 5% of the outstanding shares, other than those specified above.

The share of foreign institutional investors, including major funds, whose 
assets under management exceed USD1 billion: Kopernik Global All-Cap 
Fund, Vanguard International Equity Index Fund, MarketVectors ETF Trust 
Russia ETF, BlackRock funds is

10,0%

0,0%

-10,0%

-20,0%

-30,0%

-40,0%

-50,0%

-60,0%

-70,0%

10,0%

0,0%

-10,0%

117

-20,0%

-30,0%

-40,0%

-50,0%

-60,0%

-70,0%

%

A

A

27%of free 

float

A

B

C

Short-Term Investors

Short-Term Investors

Long-Term Investors

Long-Term Investors

Medium-Term Investors

Medium-Term Investors

A

B

C

4.1%

71.4%

24.5%

4.1%

71.4%

24.5%

C

C

A

A

%

%

B

B

ММВБ

Micex PWR

ММВБ

Micex PWR

ФСК

ФСК

-7,1%

-22,7%

-7,1%

-22,7%

-49,3%

-49,3%

1.5

1.0

0.5

0.0

1.5

1.0

0.5

0.0

30.12.13 31.01.14

30.12.13 31.01.14

28.02.14

31.03.14

28.02.14

30.04.14

31.03.14

30.05.14 30.06.14

30.05.14 30.06.14

31.07.14

30.04.14

29.08.14

31.07.14

30.09.14

29.08.14

31.10.14

30.09.14

28.11.14

31.10.14

30.12.14

28.11.14

30.12.14

Цена DR на LSE, USD

Цена DR на LSE, USD

Приведенная цена DR по итогам торгов на ММВБ

Приведенная цена DR по итогам торгов на ММВБ

300 000

250 000

200 000

150 000

100 000

50 000

0

300 000

250 000

200 000

150 000

100 000

50 000

0

02.01.14 03.02.14

02.01.14 03.02.14

03.03.14

01.04.14

03.03.14

01.05.14

01.04.14

02.06.14 01.07.14

02.06.14 01.07.14

01.08.14

01.05.14

01.09.14

01.08.14

01.10.14

01.09.14

03.11.14

01.10.14

01.12.14

03.11.14

31.12.14

01.12.14

31.12.14

CORPORATE GOVERNANCE / CONTROL SYSTEMJSC Russian Grids

JSC Centerenergoholding

Kopernik Global All-Cap Fund

Index of Energy FGC UES LLC

80.13%

A

B

C

D

E

A

B

C

D

E

JSC Russian Grids

JSC Centerenergoholding

Others

Kopernik Global All-Cap Fund

Index of Energy FGC UES LLC

Others

2.62%

1.62%

1.08%

14.55%

E

80.13%

2.62%

1.62%

D

1.08%

B

C

14.55%

E

D

C

B

%

A

%

A

Foreign Investor Breakdown 
by Investment Horizons

A

B

C

Short-Term Investors

Long-Term Investors

Medium-Term Investors

C

4.1%

71.4%

24.5%

A

B

C

Short-Term Investors

Long-Term Investors

Medium-Term Investors

4.1%

71.4%

24.5%

C

A

A

%

B

%

B

STOCK MARKE T 

ММВБ

ММВБ

Shares of Federal Grid Company are 
traded on the “Level 1” quotation list of 
the MICEX Stock Exchange, which is a 
member of JSC Moscow Exchange Group, 
and are included in the list of securities 
traded at the St.Petersburg Exchange. 
The Company shares are included in the 
index calculation base of key Russian and 
foreign indices.

Micex PWR

Micex PWR
Federal Grid’s Share 
Information

ФСК

Federal Grid’s Share Weighting 
in Key Share Indices, %

ФСК
Share category

Nominal value

MICEX Ticker

SPBEX Ticker

LSE Ticker

ISIN

Ordinary 
registered non-
documentary

MICEX Index

MicexPWR

RUB0.50

RTSI

-7,1%

-22,7%

FEES

-7,1%

FEES

FEES

-22,7%

Russian Traded 
Index (Vienna Stock 
Exchange)

The RTX Energy 
(Vienna Stock 
Exchange)

-49,3%

RU000A0JPNN9

Bloomberg Code

FEES RX

(as of 31 December 2014)

-49,3%

0.19

10.76

0.19

0.20

13.56

In 2014, electricity industry equities 
were major underperformers – the Micex 
PWR sector index went down by 22.7%. 
The industry indicator declined quicker 
than the MICEX Index, largely due to low 
investment attractiveness of companies 
in the industry against the background 
of restraining tariff policy, including zero 
indexation of tariffs in 2014.

•  Slowdown in Russia’s economic growth, 

ruble devaluation, inflation rate, af-
fecting the attractiveness of internal 
market-oriented companies 

•  USA and EU sanctions against Russia 
that have affected credit ratings and 
outlooks of the Russian Federation and 
the State-owned companies 

settlements with consumers based on 
actual capacity 

•  Uncertainty with the recovery of costs 
for technological connection by gener-
ating companies 

•  The sharp rise in funding costs 

In 2014, Federal Grid Company’s shares 
lost 49.3%, underperforming the Micex 
PWR sector index. The following factors 
had an additional adverse impact on the 
Company’s shares:

•  The need to implement a large-scale 
investment programme under tariff 
restraints 

•  Regulator’s proposals to switch to 

•  Exclusion of the Company’s shares from 

the MSCI Russia index in June 2014

Key Parameters of Federal Grid Company Share Trading

Volume 

Number of deals

Low 

High

Period end

units

RUB

units

RUB

RUB

RUB

2011

2012

2013*

2014

476,111,513,800

619,919,120,000

989 348 930 000

1,068,425,610,000

159,370,754,044

147,513,331,183

116,812,022,883

65,320,385,915

2,043,606

2,698,318

3,235,854

2,390,457

0.21111

0.481

0.2811

0.1513

0.3768

0.20104

0.07508

0.226

0.09016

Number of shares 

mln, shares

1,255,948 

1,260,387

1,267,141

Capitalisation at year end

RUB, mln

351,163.1

253,904.89

114,600.23

* T+2 trade results are calculated from 2 September 2013 – date of Moscow Exchange’s switch to this trading mode as a basic one.

0.02900

0.09389

0.04402

1,274,665

56,110.77

30.12.13 31.01.14

28.02.14

31.03.14

30.04.14

30.05.14 30.06.14

2014 Share Performance
29.08.14
31.07.14

30.09.14

31.10.14

28.11.14

30.12.14

Source: Moscow Exchange website, / moex.com

30.12.13 31.01.14

28.02.14

31.03.14

30.04.14

30.05.14 30.06.14

Global equity markets closed mixed in 
2014: the index of developed countries MSCI 
30.09.14
29.08.14
World has increased by 2.9%, while the in-
dex of emerging MSCI EM declined by 4.6%.

31.07.14

In the reporting year, the Russian market 
lost 7.1% under the MICEX index, which is 
31.10.14
30.12.14
28.11.14
looks worth than MSCI World and MSCI EM 
behaviour. The main negative factors for the 
Russian market were a sharp decline in oil 

prices in the second half of the year (as of 
the end of the year Brent Oil quotes fell by 
48%) and economic sanctions of Western 
countries against Russia.

Цена DR на LSE, USD

Приведенная цена DR по итогам торгов на ММВБ

Electricity Sector, Federal Grid Company’s shares

Цена DR на LSE, USD

Приведенная цена DR по итогам торгов на ММВБ

0.0%

10.0%

–10.0%

–20.0%

–30.0%

–40.0%

–50.0%

1.5

1.0

0.5

0.0

–7.1%

–22.7%

–49.3%

1.5

1.0

0.5

02.01.14 03.02.14

03.03.14

01.04.14

01.05.14

02.06.14 01.07.14

–60.0%

01.08.14

01.09.14

01.10.14

03.11.14

01.12.14

31.12.14

02.01.14 03.02.14

03.03.14

01.04.14

01.05.14

02.06.14 01.07.14

01.08.14

3
1
.
2
1
.
0
3

4
1
.
1
0
.
1
3

01.09.14

4
1
.
2
0
.
8
2

01.10.14

4
1
.
3
0
.
1
3

4
1
.
4
0
.
0
3

03.11.14

–70.0%

4
1
.
5
0
.
0
3

4
1
.
6
0
.
0
3

4
1
.
7
0
.
1
3

01.12.14

31.12.14

4
1
.
8
0
.
9
2

0.0

4
1
.
9
0
.
0
3

4
1
.
0
1
.
1
3

4
1
.
1
1
.
8
2

4
1
.
2
1
.
0
3

Plans to improve investment attractiveness 

Implementation of measures aimed at maintaining and improving the investment attractiveness of Federal Grid Company is one of 

the priorities of our financial and eco-
nomic policy for 2015 and includes the 
following: 

map’) on introducing key provisions of 
the new Russian Corporate Governance 
Code 

2015, updating the dividend policy, the 
delivery of the Long-Term Development 
Programme

•  With respect to corporate governance, 
implementing an action plan (‘road 

•  With respect to financial and economic 
activity, ensuring the Company’s oper-
ating profitability at a level not below 
the target value, implementing the Pro-
gramme for ensuring financial stability 
and increasing economic efficiency of 
the Company’s operations for 2014-

•  With respect to our investment pro-
gramme, improving the efficiency of 
investing activities through the invest-
ment cost optimisation under tight 
liquidity conditions, revising volumes 
and sources of financing 

Micex

MicexPWR

FGC UES

118

119

10,0%

0,0%

-10,0%

-20,0%

-30,0%

-40,0%

-50,0%

-60,0%

-70,0%

300 000

250 000

200 000

150 000

100 000

50 000

0

10,0%

0,0%

-10,0%

-20,0%

-30,0%

-40,0%

-50,0%

-60,0%

-70,0%

300 000

250 000

200 000

150 000

100 000

50 000

0

CORPORATE GOVERNANCE / SHARE CAPITAL Global Depository Receipt Programme

DIVIDEND POLICY

On 30 June 2008, Federal Grid Company 
launched a global depository receipt (GDR) 
programme, which was not listed under 
Regulation S and Rule 144A. In 2011, the 
Company completed a technical listing of 
depository receipts on the Main Market of 
the London Stock Exchange (LSE), which 
began trading Federal Grid Company 
GDRs on 28 March. From 1 July 2013, the 
Programme’s depository bank is the Bank 
of New York Mellon (BNY Mellon).

As of 31 December 2014, the GDR pro-
gramme had 8.7 million receipts, rep-
resenting 0.34% of the Company’s share 
capital.

GDR Programme Volume 

GDR Programme Highlights 

Ratio 

1 GDR : 500 shares

1 GRD : 500 shares

Regulation S

Rule 144A

International Code

Common Code: 036273577 
ISIN: US3133542015

Common Code: 0362733372 
ISIN: US3133541025

Price per GDR as of 31 December 2014

USD 0.79

-

-

-

Number of GDRs as of 31 December 2014 

1,252,623 

7,425,700

Our dividend policy strikes a balance 
between shareholders’ interests, the 
Company’s business needs, and the need 
to enhance its investment attractiveness 
and capitalisation. 

All the dividend policy principles, mecha-
nisms for determining the size of div-
idends, procedure, period and form of 
dividend payment are set in the Reg-
ulations on Dividend Policy of Federal 
Grid Company approved by the Board of 
Directors. 

The General Meeting of Shareholders 
resolves on dividend payment based on 
recommendations of the Board of Direc-
tors with respect to dividend amount. The 
recommended dividend payout amount is 
determined by the Board of Directors on 
the basis of the Company’s financial results 
and, in accordance with the Dividend Policy, 
shall not be less 10% of net profit under 
RAS. The table below shoes the profit 
distribution and dividend payment in ac-
cordance with the resolutions of the Annual 
General Meetings of Shareholders: 

2011 AGM (for 2010) – Minutes No 11  
dated 4 July 2011

2012 AGM (for 2011) – Minutes No 12  
dated 2 July 2012

2013 AGM (for 2012) – Minutes No13  
dated 2 July 2013 

2014 AGM (for 2013) – Minutes No 15  
dated 30 June 2014

n
o
i
l
l
i

,

m
A
4
4
1
d
n
a
S
g
e
R
e
m
u
l
o
v
e
m
m
a
r
g
o
r
P
R
D
G

9.0

8.0

7.0

6.0

5.0

4.0

3.0

2.0

1.0

0.0

0.426%

s
t
p
i
e
c
e
r

12.0

11.0

10.0

0.327%

0.408%

0.408%

0.394%

0.382%

0.377%

0.377%

0.377%

0.334%

0.334%

0.340%

0.40

0.50

31.01.14

28.02.14

31.03.14

30.04.14

30.05.14

30.06.14

25.07.14

29.08.14

30.09.14
39.09.14

31.10.14

28.11.14

31.12.14

RegS

144А

Programme volume as a percentage of share capital, %

0.30

0.20

0.10

0.00

GDR Price and Trading Volume, LSE 

%

,
l
a
t
i
p
a
c
e
r
a
h
s
f
o
e
g
a
t
n
e
c
r
e
p
a
s
a
e
m
u
l
o
v
e
m
m
a
r
g
o
r
P

2010-2014 Net Profit Distribution, RUB thousand

for 2010(2011 
AGM)

for 2011(2012 
AGM)

for 2012(2013 
AGM)

for 2013(2014 
AGM)

for the 1st 
quarter of 2014 
(2014 AGM)

Retained net profit (loss) for the reporting period:

58,088,388

- 2,468,359

- 24,501,917

- 25,897,521

1,210,472

Reserve Fund

For development 

Dividends

Covering losses from prior years 

2,904,419

18,578,192

2,577,664

34,028,113

-

-

-

-

-

-

-

-

-

-

-

-

-

-

436,803

-

2010-2014 Dividend History 

for 2010(2011 
AGM)

for 2011(2012 
AGM)

for 2012(2013 
AGM)

for 2013(2014 
AGM)

for the 1st 
quarter of 2014 
( 2014 AGM)

s
t
p
i
e
c
e
r
,
e
m
u
l
o
v
g
n
d
a
r
t
R
D

i

300,000

250,000

200,000

150,000

100,000

50,000

0

4
1
.
1
0
.
2
0

D
S
U

,
e
c
i
r
P

1.5

1.0

0.5

0.0

Dividend per share, kop. 

Total amount of dividends declared, RUB mln

Share of net profit allocated for dividends, %

Total paid, RUB mln

Paid to declared dividend ratio, % 

0.21

2,577.7

4.44%

2,569.3*

99.67%

4
1
.
2
0
.
3
0

4
1
.
3
0
.
3
0

4
1
.
4
0
.
1
0

4
1
.
5
0
.
1
0

4
1
.
6
0
.
2
0

4
1
.
7
0
.
1
0

4
1
.
8
0
.
1
0

4
1
.
9
0
.
1
0

4
1
.
0
1
.
1
0

4
1
.
1
1
.
3
0

4
1
.
2
1
.
1
0

4
1
.
2
1
.
1
3

Deadline for paying accrued dividends 

28.08.2013

DR trading volume, receipts

DR price on LSE, USD

Adjusted DR price at the end of trading on MICEX

No dividends were declared for 2011, 2012 and 2013.

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

0.034

436.8

36%

434.8**

99.54%

20.08.2014***

* Dividends were paid in full to all shareholders registered in the Company’s shareholder register excluding the amount of RUB 8,383,793.57 to those shareholders who 
had not timely informed about changes in their personal data or who had submitted incorrect payment details 

** Dividends were paid in full to all shareholders registered in the Company’s shareholder register excluding the amount of RUB 1,969,379.12 to those shareholders who 
had not timely informed about changes in their personal data or who had submitted incorrect payment detail.

*** For nominees the deadline for dividend payment is 20 July 2014.

120

121

CORPORATE GOVERNANCE / SHARE CAPITAL  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2014 
Dividends

Other shareholder income received 
from the Company 

In accordance with Clause 2 of Article 42 
of the Federal Law “On Joint Stock Com-
panies” and Clause 7.5 of Article 7 of Fed-
eral Grid Company’s Articles of Associa-
tion, dividends shall be paid out from the 
Company’s net income determined under 
the Company’s accounting statements.

In 2014, the Company’s Annual General 
Meeting of Shareholders will make a Res-
olution on the 2014 dividend payment will 
be made by the Annual General Meeting of 
Shareholders that will be held in 2015. 

In 2014, Federal Grid Company and its 
majority shareholder JSC Russian Grids 
entered into service contracts for arrang-
ing operation and developing the electric 
grid complex, as well as for providing 
technical supervision of electric grid 
facilities of Federal Grid Company. The 
contracts were approved by the Federal 
Grid’s Board as related-party transac-

tions (Minutes No 208 dated 27 December 
2013 and Minutes No 211 dated 30 January 
2014).

The total cost of services of JSC Russian 
Grids is RUB609.4 million, including VAT 
(18%). The period of services is from 1 
January 2014 to 31 December 2014. 

INFORMATION POLICY 
Informational Openness 

The corporate information policy of 
Federal Grid Company is one of the key 
instruments to ensure an extensive stake-
holder support of the Company’s activities 
and to strengthen effective stakeholder 
engagement. 

Federal Grid provides prompt and full 
disclosure of all material information, 
including the financial and operating 
results, ownership structure, notices of 
material facts, and other information in 
accordance with the legislative require-
ments and corporate governance best 
practices. 

When providing information to stakehold-
ers, the Company strictly observes the 
rules for the handling of inside informa-
tion, trade secrets and other information 
protected by law.

Regulations on Information Policy

The Regulations on Information Policy of 
Federal Grid Company approved by the 
Company’s Board sets the main principles 
and provides a comprehensive company 
framework for information disclosure.

In accordance with the Action Plan (‘road 
map’) on implementing the Russian 
Corporate Governance Code provisions, 
it is expected to approve a new version of 
the Information Policy in 2015. In particu-

lar, changes will be made in the list of 
additional information which the Company 
undertakes to disclose on its corporate 
website.

2013 Annual Report of 
Federal Grid Company 
was among the winners 
of the best Russian and 
international competitions 

• II position in the Annual Report 

Rating of Expert RA rating agency 

• Nomination in the “The Best Annual 

• Gold winner in the “Annual Report/

Report (Non-financial Sector)” category 
in the Expert RA competition

Utility” category of MarCom Awards 
2014

• Platinum winner in the “Writing/Annual 

Report”and”E-Communication/E-
Annual Report” categories of MarCom 
Awards 2014

• «Silver award in the “Print: Annual 
Report” category of The Spotlight 
Awards competition

Public Relations 

Federal Grid Company closely engages with 
stakeholders on a regular basis, including 
government authorities, public organisa-
tions and Mass Media. To implement the 
Company’s policy in this area, a Department 
of External Communications and Gov-
ernment Relations has been created and 
operates actively. 

An open discussion of the Federal Grid’s 
Investment Programme for the years of 
2015-2019 became one of the key events of 
the reporting year. Thanks to publishing all 
the necessary information on the Company 
website experts and consumers had an 
opportunity to familiarise themselves with 
the draft Programme and to make propos-
als for its improvement. In February 2014, 
the public hearing was successfully held at 
the meeting of the RF Open Government, 
and in November, the RF Ministry of Energy 
approved the Federal Grid’s Investment 
Programme for five years. 

During the reporting year, quarterly meet-
ings of the Consumer Council were held 
led by the Chairman of the Federal Grid’s 
Management Board, Andrey Murov. They 
discussed issues related to the implemen-

tation of the strategy of the Russian electric 
grid complex, including the accessibility 
of energy infrastructure, efficiency of the 

Company’s operating and investing activi-
ties, its informational openness and public 
control.

Meetings with foreign partners 
Kazakhstan  
During the meeting with Kazakhstan 
Electricity Grid Operating Company 
KEGOC an agreement was reached 
to expand cooperation in the area 
of parallel operation of the energy 
systems in Kazakhstan and Russia. 

Georgia 
At the working meeting attended by 
the Chairman of the Federal Grid’s 
Management Board, Andrey Murov, 
and the Vice-Prime Minister, the 
Minister of Energy of Georgia, Khaha 
Kaladze issues were discussed on 
the cooperation between Federal Grid 
Company, GruzRosenergo and INTER 
RAO, potential construction of cross-
border electricity transmission line and 
building an infrastructure to extend 

electricity supply to Georgia and its 
transit to third countries. 

India  
At the working meeting of Federal Grid 
executives with the representatives 
of Power Grid Corporation of India 
Ltd. matters were considered on 
engagement with the Russian 
manufacturers of electrical equipment.

Finland  
Several meetings were held between 
the Federal Grid representatives 
and a Finnish company Fingrid Oyj 
and agreements were signed on 
technological and organisational 
aspects of two-way trade in electricity 
between Russia and Finland. 

Disclosure channels 

In compliance with the principles of 
timeliness and availability of disclosure, 
Federal Grid Company uses various 
disclosure channels, primarily electron-
ic, which ensure free and easy access to 
information for all stakeholders without 
any specific procedures (getting pass-
word, registration and other technical 
restrictions). 

We regularly update our corporate 
website www.fsk-ees.ru which appears 
to be our main disclosure channel. The 
website presents data on the Federal 
Grid’s areas of activity, information for 
shareholder and investors, customers, 

suppliers, and employees, the latest news 
and press-releases, financial statements, 
annual reports and reports on sustaina-
ble development. 

In addition to mandatory disclosures, 
our website contains other information 
useful for stakeholders. We also strive to 
improve the structure of this information 
source by developing new interactive 
tools for user convenience. 

In addition to publishing significant 
information on its website, the Company 
discloses information on the website of 
Interfax agency, on the home pages of the 

Moscow Exchange, London Stock Ex-
change, and in the print edition of Rossi-
yskaya Gazeta, as well as disseminating 
price-sensitive information through the 
RNS portal. 

Our annual and social reports appear to 
be not less important tool for the Compa-
ny to communicate with its shareholders, 
investors and other stakeholders. The re-
ports have links to the corporate website, 
which ensure a common information area 
where the users may easily navigate and 
find what they are looking for quickly. 

Participation in Forums and Conferences 

In February, the Federal Grid delegation 
took part in the 2014 Krasnoyarsk Eco-
nomic Forum, where the government of 
Krasnoyarsk Krai, Federal Grid Company 
and Polyus Gold Mining Company signed 
a tripartite cooperation agreement on 
implementation of the global project “Ang-
ar-Yenisey Cluster”. 

The Chairman of the Management Board, 
Andrey Murov, held a number of meet-
ings at the St. Petersburg International 
Economic Forum, including with the heads 
of the companies Schneider Electric and 
ABB, and signed an agreement with the 

Federal Service for State Registration, 
Cadastre and Cartography. 

In August 2014, Federal Grid took part 
in the 45th Session of the International 
Council on Large Electric Systems CIGRE. 
During the forum, the Federal Grid Sci-
entific and Technical Center signed a few 
agreements with the companies KEMA 
and Alstom Grid and KEMA. Meeting were 
also held with the companies Siemens and 
Alstom Grid, where the matters were dis-
cussed on import substitution and imple-
mentation of joint projects on constructing 
energy facilities.

At the International Investment Forum 
Sochi-2014, the round tables were held 
with participation of the Chairman of the 
Federal Grid’s Management Board on the 
role of Fuel and Energy Complex in the 
Russian economy and the development of 
Far East infrastructure. 

In November, at the Third Internation-
al Forum on Energy Saving and Energy 
Efficiency ENES 2014, Andrey Murov told 
about the improvements in the Company’s 
governance system, reduction of trans-
mission losses and new developments for 
transmission facilities.

122

123

КОРПОРАТИВНОЕ УПРАВЛЕНИЕ / АКЦИОНЕРНЫЙ КАПИТАЛINVESTOR REL ATIONS

Dialogue with Investment Community 

Additional information 

DISCL AIMER

Federal Grid Company is a public company, 
one of the top blue chips of the Russian en-
ergy sector. Our IR Team strives to maintain 
strong relationships with the investment 
community, actively communicates with 
analysts and investors. 

Our main task in engaging with the invest-
ment community is to provide all community 
representatives with accurate and up-to-
date information on the Company’s opera-
tional and financial performance, as well as 
its development prospects.

We consider an active dialogue with the 
investment community to be important also 
for getting feedback from this audience, 
to understand how certain decisions may 
impact the investors’ assessment of the 
Company, and how investors perceive the 
Company, its strategy and operations. 

In 2014, Federal Grid’s management held 
a series of one-on-one meetings with in-
vestors in line with the Company’s policy on 
improving investment attractiveness among 
the financial market participants. 

During the reporting year, the Company spe-
cialists held conference calls with investors 
following the publication of the IFRS financial 
statements for 2013 financial year and the 
first half of 2014. The First Deputy Chairman 
of the Management Board, Andrey Kazach-
enkov, who is responsible for financial mat-
ters in the Company, acted as a speaker. 

In December 2014, the Chairman of the Man-
agement Board of Federal Grid Company, 
Andrey Murov, held a meeting with investors. 
At the meeting, Mr. Murov told investors 
about the 2015-2019 electric grid complex 
development strategy. The meeting was held 
for the second time, and we expect them to 
become a tradition.

IR Awards

In November 2014, our 
Company was included in the 
list of nominees for IR Society 
Best Practice Awards 2014 in 
the categories «Best Annual 
Report» and «Best Use of 
Digital Communications» 

2015 Investor Calendar 

Date 

Event /Location

25 March

2014 Annual Results (RAS)

2-3 April 

FY2014 Annual Financial Report (FSA), FY 2014 Financial Results 
(IFRS)

April

Sberbank CIB Russia Investment Forum / Moscow

on or before 30 April  Q1 2015 Financial Results (RAS) 

19-20 June

St. Petersburg International Economic Forum 2015 / St. Petersburg 

26 June

Annual General Meeting of Shareholders 

on or before 30 July

H1 2015 Financial Results (RAS) 

on or before 29 
August

H1 2015 Financial Results (IFRS)

beginning of October VI VTB Capital Investment Forum RUSSIA CALLING / Moscow

on or before 30 
October

November

Q3 2015 Financial Results (RAS)

Third meeting of the Chairman of the Management Board,  
Andrey Murov, with investors / Moscow 

This annual report (hereinafter – the Annual Report) was prepared 
based on information available to Federal Grid Company and its 
subsidiaries and associates at the time this Report was compiled.

“will be”, “continue” or similar words and expressions or varia-
tion thereon.

The Annual Report includes, among other things, statements re-
garding the Company’s future operations based on management’s 
current forecasts and assessments. There are a number of objec-
tive factors that could cause actual results to differ materially from 
the above forecasts and assessments. 

The Annual Report contains certain forward-looking statements 
regarding business operations, economic and financial indicators 
of the Company, its business plans, projects and expectations. 
The Annual Report may also contain estimates of price changes, 
production and consumption volumes, costs, expenses, devel-
opment prospects and other similar factors, as well as forecasts 
on industry and market development, beginning and end dates of 
certain projects of the Company.

By their nature, forward-looking statements involve risks and un-
certainties, both general and specific, that may cause the relevant 
assumptions, forecasts, projections and other forward-looking 
statements do not materialise. In view of the above risks, uncer-
tainties and assumptions, the Company cautions that its actual 
results may differ materially from those expressed or implied in 
such forward-looking statements. 

These statements are neither promises nor guarantees, and the 
Company shall not be liable for any losses incurred by legal entities 
and individuals who relied on forward-looking statements. Such 
forward-looking statements represent, in each case, only one of 
many possible scenarios and should not be viewed as the most 
likely scenario.

Such forward-looking statements can be identified by the use of 
the terminology such as “intend”, “strive”, “project”, “expect”, 
“estimate”, “plan”, “anticipate”, “assume”, “may”, “could be”, 

Except as required by applicable legislation, the Company does 
not undertake any obligation to release publicly any updates and 
revisions of such forward-looking statements whether as a result 
of new information or future events.

CONTACTS

FGC UES, JSC

Company Auditor (RAS)

Open Joint Stock Company Federal Grid Company  
of Unified Energy System 

RSM RUS Limited Liability Company 
(RSM RUS LLC) 

Actual and postal address:

5A Academica Chelomeya 
str., Moscow 117630, 
Russia 

Call centre: 

8 800 200 1881

For calls from neighbouring countries 
and beyond: 

 +7 (495) 710 9333

Fax: 

E-mail

Website: 

For shareholders: 

Fax: 

 +7 495 710 9655

info@fsk-ees.ru

http://fsk-ees.ru

8 800 200 1881

+7 (495) 710 9641

Address: 

Phone:

Fax: 

E-mail

INN:

OGRN:

4 Pudovkina str., Moscow 
19285, Russia 

+7 495 363 2848

+7 495 981 4121

mail@top-audit.ru

7722020834

1027700257540

SRO Membership:

Full name: self-regulatory organisation Non-for-Profit 
Partnership “Audit Association “Sodruzhestvo” 

Address: 21/4 Michurinsky prospect, Moscow 119192, Russia 

IR Team

Phone: 8 (800) 200-1881
Fax: +7 (495) 710-96-41

Egor Toropov
phone: 8 (800) 200-1881 ext. 2275 
e-mail: toropov-ev@fsk-ees.ru

Alexey Novikov 
phone: 8 (800) 200-18-81 ext. 2143 
e-mail: novikov-as@fsk-ees.ru

124

125
125

CORPORATE GOVERNANCE / SHARE CAPITAL 
 
Company Auditor (IFRS)

GLOSSARY 

Abbreviations

Closed Joint-Stock Company KPMG (CJSC KPMG) 

APCS

 Automated Process Control System 

According to the terms of the dealer agreement in respect 
to the bond issue programme entered into by Federal Grid 
Company and Federal Grid Finance Limited, one of the following 
companies: PricewaterhouseCoopers, Ernst&Young, Deloitte, 
KPMG or one of its affiliates shall be appointed as an auditor for 
Federal Grid Company IFRS consolidated financial statements. 
According to this requirement, KPMG CJSC was appointed as 
Auditor for Federal Grid Company’s IFRS consolidated financial 
statements for 2014 (as adopted by the EU).

SRO Membership:

Full name: Non-for-Profit Partnership  
“Audit Chamber of Russia” 

Address: building 3, 3/9, 3rd Syromyatnichesky pereulok, 
Moscow 105120, Russia 

Legal address: 

Postal Address:

Phone:

Fax:

E-mail:

INN:

OGRN:

office 3035, 18/1 Olympic 
prospect, Moscow 119192, 
Russia

Tower Complex Block, 
10 Presnenskaya 
Naberezhnaya, Moscow 
123317, Russia 

+7 495 937 4477

+7 495 937 4499

moscow@kpmg.ru

7702019950

1027700125628 

Company Registrar

Depositary 

Joint-Stock Company «Registrar Society STATUS»
(CJSC STATUS) 

Non-Banking Credit Organisation Closed Joint-Stock Company 
National Settlement Depository (CJSC NSD)

Address: 

Phone:

Fax:

E-mail:

building 1, 32 
Novorogozhskaya str., 
Moscow 109544, Russia

+7 495 974 8350 

+7 495 678 7110 

info@rostatus.ru

Address: 

Phone:

E-mail:

building 12, 
Spartakovskaya str., 
105066 

+7 495 234 9960

sales@nsd.ru

License number:

10-000-1-00304

Issue date:

Issue date:

Validity period:

12.03.2004 

non-expiry

Validity period:

Issuing authority:

19.02.2009 г.

non-expiry

FFMS of Russia 

Issuing authority:

FFMS of Russia 

License number:

177-12042-000100

126
126

ASEPCR

Automated Systems of Electric Power Control and Rrecording

BRELL

Belarus, Russia, Estonia, Latvia and Lithuania

CCGT

Combined-Cycle Gas Turbine

CEO

CHP

Chief Executive Officer

Combined Heat and Power

IPS

JSC 

KPI

LED

LLC

MES

Integrated Power System

Joint Stock Company 

Key Performance Indicator

Light Emitted Diode

Limited Liability Company

Backbone Electric Grid

CIMS

Corporate Information-based Management System

MICEX

Moscow Interbank Currency Exchange

CIS

The Commonwealth of Independent States

MPEI

Moscow Power Engineering Institute

CIS EPC

CIS Electric Power Council 

NGPP

Non-Governmental Pension Program

DECT

 Digital European Cordless Telecommunications

DSS

Digital Substation

NPP

OHL

Nuclear Power Plant

Overhead Line

EBITDA

Earnings before Interest, Taxation, Depreciation & Amortisation 

OHTL

Overhead Transmission Line

EMS

Environmental Management System

RAS

Russian Accounting Standards

ESUPCN

Energy System’s Unified Process Communications Network

PABX

Private Automated Branch Exchange 

Federal Financial Market Service 

PMES

Backbone Electric Grid Enterprise

Fibre-Optic Communications Network 

PSPP

Pumped Storage Power Plant

FFMS

FOCN

GDR

Global Depository Receipt 

GLONASS

Global Navigation Satellite System

GMS

GRI

General Meeting of Shareholders

Global Reporting Initiative 

PTL

R&D

RAB

RPD

Power Transmission Line 

Research and Development

Regulatory Asset Base 

Rate of Process Disturbances

GRES

State District Power Plant

RUIE 

Russian Union of Industrialists and Entrepreneurs 

HPP

HIFs

HR

HVL

IFRS 

 IDR

IDGC 

ICS

Hydro Power Plant

Hazardous Industrial Facilities 

Human Recourses 

High Voltage Line

SS

TPP

UES

Substation

Thermal Power Plant

Unified Energy System 

UNEG

Unified National Electric Grid 

International Financial Reporting Standards

VAT

Value Added Tax

Issuer Default Ratings 

WECM

Wholesale Electricity and Capacity Market 

Inter-regional Distribution Grid Company 

VRP ACS

Voltage and Reactive Power Automatic Control System

Internal Control System

WWF

World Wide Fund for Nature (formerly World Wildlife Fund)

Units of measure

bn

billion

l

litre

Gcal

gigacalorie

mln

million

GW

km

kv

gigawatt

kilometer

kilovolt

MVA

megavolt-ampere

MVAr megavolt-ampere reactive

MW

megawatt

kW

kilowatt

p.p. 

Percentage point 

kWh

Kilowatt-hour

127
127

ADDITIONAL INFORMATION  
 
 
 
Appendices 

REPORT2014.FSK-EES.RU

•  Additional Information by Section of the 

Annual Report 

•  Information about the Structure of 
the Property Portfolio of Federal 
Grid Company 

•  RAS Annual Financial Statements 

•  Information on Compliance with the 
Russian Corporate Governance Code

Assets of Federal Grid Company 
in 2014

•  Information on Disposal of Non-Core 

•  Information about Transactions 

•  Management Report 2014

•  Information on the Actual Performance 
of Assignments of the President and the 
Government of the Russian Federation

•  IFRS Consolidated Financial 

Statements

128

Following the best disclosure practices, 
Federal Grid Company provides all 
stakeholders with an interactive version of 
the 2014 Annual Report. It includes user-
friendly functions for data analysis, interactive 
elements and all Appendices to the Report.