Quarterlytics / Basic Materials / Gold / Kula Gold

Kula Gold

kgd · ASX Basic Materials
Claim this profile
Ticker kgd
Exchange ASX
Sector Basic Materials
Industry Gold
Employees 1-10
← All annual reports
FY2024 Annual Report · Kula Gold
Sign in to download
Loading PDF…
 
 
 
 
 
 
Kula Gold Limited 
ABN 83 126 741 259 
 
 
 
Annual Report     
for the year ended 31 December 2024 

Kula Gold Limited 
 
Corporate Information 
 
Board of Directors 
Mr Mark Stowell 
Chairman 
Mr Ric Dawson  
Mr Mark Bojanjac 
 
 
 
Company Secretary 
Mr Keith Bowker 
 
Principal Place of Business & Registered Office  
Suite 2, 20 Howard Street 
PERTH WA 6000 
 
PO Box Z5207 
St Georges Terrace 
PERTH WA 6831 
 
Telephone:  
+61 8 6144 0592 
Email:   
cosec@kulagold.com.au  
Website:  
www.kulagold.com.au 
 
Auditor 
Elderton Audit Pty Ltd 
Level 32, 152 St Georges Terrace  
PERTH WA 6000 
Telephone:  
+61 8 6324 2900 
Website: 
www.eldertongroup.com  
 
Share Registry 
Automic Group 
Level 5, 191 St Georges Terrace 
PERTH WA 6000 
Telephone: 
1300 288 664 
Email:  
hello@automic.com.au  
Website: 
www.investor.automic.com.au  
 
Securities Exchanges 
Australian Securities Exchange 
Level 40, Central Park 
152- 158 St Georges Terrace 
PERTH WA 6000 
Website: 
www.asx.com.au  
ASX Code: 
KGD 
 
Berlin Stock Exchange: BE Code: 7KL 
 

Kula Gold Limited 
 
Annual report  
for the year ended 31 December 2024 
 
Contents 
 
Chairman’s letter……………………………………………………………………………………………………………………………………… 
1 
Cautionary statements…………………………………………………………………………………………………………………………… 
2 
Directors’ report……………………………….……….…………………………………………………………………………………………… 
 
3 
 
Remuneration report………………………………………………………………………………………………………………………………. 
10 
Auditor’s independence declaration…………………………………………………………..……………………………………..…….. 
15 
Independent auditor’s report………………………………………….…………………………………………………………….…………. 
16 
Directors’ declaration…………………………………………………………………………………………………………..………………….. 
20 
Consolidated statement of profit or loss and other comprehensive income…………………………………………….. 
21 
Consolidated statement of financial position………………………………………………………………..……………………….... 
22 
Consolidated statement of changes in equity…………………………………………………….……………………………..…..… 
23 
Consolidated statement of cash flows……………………………………………………………..……………….……………………… 
24 
Notes to the consolidated financial statements….………………………………………………..…………..…………………….. 
25 
Consolidated entity disclosure statement……………………………………………………………………………………………….. 
52 
Additional information for listed public companies………………………………………………………………………………… 
53 
Mineral resources and ore reserves statement……………………………………………………………………………………… 
55 
Tenement schedule……………………………………………………………………………………………………………………………….. 
56 

Kula Gold Limited 
- 1 - 
 
Chairman’s letter 
 
 
Dear Shareholder 
 
Kula’s exploration activities have continued to seek the elephant that juniors strive to discover and reward all 
shareholders handsomely. 
 
During the year we acquired the Mt Palmer Gold Mine and added this to our large Southern Cross landholding, 
so we cover the entire Mt Palmer/Yellowdine belt around this historic producer. 
 
Work is well underway and many days in the field are now delivering a swathe of drill targets with some 
understanding of what is driving the gold mineralisation. 
 
At Kirup WA last year we reported a new gold target with up to 3.5g/t gold in rockchips. This has moved quickly 
with Government EIS funding support and maiden drill program success with 2m @ 2.3g/t gold from 34m. Work 
is well underway on ground to get a better understanding of this exciting new area before further drilling. 
 
Kula continues the long process of finalising the mining lease application and is continuing discussions to advance 
development of the Boomerang Kaolin Deposit, near Southern Cross WA. 
 
We would like to thank all our team, contractors and consultants for their untiring efforts over the past year and 
look forward to seeing the Company put together its maiden gold resource.  
 
“The reliability of exploration is based not on certainty but on a radical lack of certainty.  
That’s the challenge and exciting part of this business” 
 
Yours sincerely, 
 
Mark Stowell 
Chairman 
Kula Gold Limited     
 
 
 

Kula Gold Limited 
- 2 - 
 
Cautionary statements 
 
Forward-looking statements 
 
The annual report may contain certain forward-looking statements. Such statements are only predictions, based 
on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which 
are beyond the Company’s control. Actual events or results may differ materially from the events or results 
expected or implied in any forward-looking statement. 
 
The inclusion of such statements should not be regarded as a representation, warranty or prediction with 
respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are 
likely to be fulfilled. Kula Gold Limited undertakes no obligation to update any forward-looking statement to 
reflect events or circumstances after the date of the annual report (subject to continuous disclosure 
requirements under the ASX Listing Rules). 
 
The information in the annual report does not take into account the objectives, financial situation or particular 
needs of any person or organisation. Nothing contained in the annual report constitutes investment, legal, tax 
or other advice. 
 
Previous Disclosure – 2012 JORC Code 
 
The information in the annual report that relates to specific exploration results, exploration targets and 
exploration data for the Company’s projects were extracted from previously released ASX announcements.  
 
A copy of such announcements are available to view on the Company’s website www.kulagold.com.au. The 
reports were issued in accordance with the 2012 Edition of the JORC Australasian Code for Reporting of 
Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of any new 
information or data that materially affects the information included in the original market announcements. The 
Company confirms that the form and context in which the Competent Person’s findings are presented have not 
been materially modified from the original market announcement. 
 
Refer to the Mineral Resources and Ore Reserves Statement on pg 55 for further information. 
 
 
 
 

Kula Gold Limited 
- 3 - 
 
Directors’ report 
The directors of Kula Gold Limited (“Kula” or “the Company”) and its controlled entities (“the Group”) submit 
herewith the annual report of the Group for the financial year ended 31 December 2024. To comply with the 
provisions of the Corporations Act 2001, the directors report as follows: 
Information about the directors 
The names and particulars of the directors of the Company during or since the end of the financial year are: 
 
Mr Mark Stowell 
Qualifications 
Non-Executive Chairman (appointed 16 September 2010) 
Chartered Accountant 
 
Mr Stowell has over 20 years of corporate finance and resource business 
management experience. Mr Stowell has served as manager in the corporate 
division of Arthur Anderson and subsequently in the establishment and 
management of a number of successful ventures as principal, including resource 
companies operating in Australia and internationally. 
Mr Stowell was a founder director of Anvil Mining Ltd (Democratic Republic of 
Congo), a copper explorer and developer, for seven years until 2000. He was a 
founder and Non-Executive Director of Incremental Petroleum Limited, an oil 
and gas producer with operations in Turkey and the USA, until its takeover by a 
USA operator. He was Chairman and founder of Mawson West Ltd, a copper 
producer and explorer which completed an IPO on the Toronto Stock Exchange 
in one of the largest base metal IPO’s of 2011. 
Mr Stowell resigned from Cannon Resources Limited following a successful cash 
takeover bid by Kinterra Capital, a North American private equity fund. 
 
Mr Ric Dawson 
Qualifications 
Managing Director (appointed 18 October 2023) 
BAppSc (Geology), MBA, MAusIMM 
 
Mr Dawson holds a BAppSc (Geology) from Curtin University and an MBA from 
the University of Western Australia. Mr Dawson has over 20 years’ experience 
in gold, nickel, copper and kaolin projects throughout Western Australia and the 
Northern Territory, and as a stockbroker/analyst during that time. 
 
Mr Dawson has previously held the Manager Director roles with ASX listed 
companies Prosperity Resources Ltd and Altech Ltd. Mr Dawson’s particular 
fields of expertise are in target generation and evolution of Archean shear-vein 
style, IOGC and hydrothermal porphyry gold in Australia and Indonesia. Mr 
Dawson was also involved in the development of the initial Australian studies 
into production of high purity alumna from kaolin deposits. 
 
Mr Dawson played key roles in the advancement of gold deposits, including the 
Melville Deposit, the Masuparia Project and various Tennant Creek Projects and 
the research and development of the process of converting kaolin to high purity 
alumina at the Meckering Project in Western Australia.  
 

Kula Gold Limited 
-4 - 
 
Mr Mark Bojanjac 
Qualifications 
Non-Executive Director (appointed 21 August 2017) 
BCom, Chartered Accountant 
 
Mr Bojanjac is a Chartered Accountant with over 25 years’ experience in 
developing resource companies. Mr Bojanjac was a founding director of Gilt-
Edged Mining Limited which discovered one of Australia’s highest-grade gold 
mines and was managing director of a public company which successfully 
developed and financed a 2.4m oz gold resource in Mongolia. He also cofounded 
a 3m oz gold project in China.  
 
Mr Bojanjac was Chief Executive Officer of Adamus Resources Limited and 
oversaw its advancement from an early-stage exploration project through its 
definitive feasibility studies and managed the debt and equity financing of its 
successful Ghanaian gold mine. 
 
The above named directors held office during the whole of the financial year and since the end of the financial 
year. 
 
Directorships of other listed companies 
Directorships of other listed companies held by directors in the 3 years immediately before the end of the 
financial year are as follows: 
 
Name 
Company 
Period of directorship 
Mr Mark Stowell 
Southern Hemisphere Mining Limited 
Cannon Resources Limited 
Since 1 November 2019 
24 June 2022 – 1 December 2022 
Mr Mark Bojanjac 
PolarX Limited 
Since 13 December 2016 
 
Directors’ shareholdings 
The following table sets out each director’s relevant interest in shares and options in shares of the Company as 
at the date of this report. 
 
Directors 
Fully paid ordinary shares 
Number 
Unlisted share options 
Number 
Mr Mark Stowell 
60,131,071 
- 
Mr Ric Dawson 
5,400,000 
12,000,000 
Mr Mark Bojanjac 
7,875,000 
- 

Kula Gold Limited 
- 5 - 
 
Remuneration of key management personnel 
Information about the remuneration of key management personnel is set out in the remuneration report section 
of this directors’ report. The term ‘key management personnel’ refers to those persons having authority and 
responsibility for planning, directing and controlling the activities of the Group, directly or indirectly, including 
any director (whether executive or otherwise) of the Group. 
 
Share options granted to directors and senior management 
No share options were issued or granted to directors and senior management of the Company and its controlled 
entities as part of their remuneration during and since the end of the financial year. 
 
Company Secretary 
Mr Keith Bowker is a qualified Chartered Accountant and holds a Bachelor of Commerce degree from Curtin 
University and has experience in company secretarial, corporate compliance and financial accounting matters. 
Mr Bowker was appointed as Company Secretary on 17 June 2022. 
 
Principle activities 
The Group’s principal activity during the course of the financial year was the exploration and evaluation of 
projects in Western Australia for gold, kaolin and lithium. 
 
Review of operations 
For the 2024 financial year the Group delivered a loss before tax of $2,406,947 (2023: $2,594,866). 
As at 31 December 2024, the net assets of the Group were $1,030,575 (2023: $1,610,930). 
The cash and cash equivalents as at 31 December 2024 was $39,314 (2023: $393,378) and the Group had 
negative working capital of $293,577 (2023: negative $2,682). 
 
Mt Palmer Gold Mine – 51% earning to 80%,  
The Company acquired 51% and earning to 80% of the historical Mt Palmer Gold Mine, located near Marvel Loch 
in the Southern Cross Goldfields in Western Australia, last commercially mined in 1944 down to only the 6th level 
(~160m) with 310,000 tonnes at 15.9g/t gold for 159,000 ounces production. 
The Kula team is continuing to further develop existing gold prospects in the Mt Palmer Gold Mine, with the new 
advancing prospect Mt Palmer Bryant’s Lode returning 4m at 3.02g/t gold from 18m near surface (24MPKC005) 
aligning with historic holes of up to 7m at 3g/t gold including 1m at 10.6g/t gold (MPRC078). Additional prospects 
include: 
 
El Dorado: 6m at 8.3g/t gold from 28m 
 
Meiers Find: 600m geochemistry anomaly and 1m at 15.4g/t gold from 36m 
 
Significant desktop work has progressed on the surrounding tenements to test the full extent of the 10km long 
greenstone belt with high priority targets to discover high-grade gold mineralisation. 
Diamond HQ3 core drilling was completed during the year on 3 planned holes to extend 3 pre-collared RC holes 
24MPKC001, 24MPKC009 and 24MPKC0010 to test the down plunge, along strike extensions to the historically 
known orebody. These were diamond tails for a total of 307.4m to extend the RC pre-collar holes 24MPKC001 
and 24MPKC009. They were primary key structural holes to start modelling the system, and unfortunately did 
not intersect resource grade gold. They do however provide valuable data for structural studies, which are 
required in these types of gold systems to understand the origin and formation of the rich lodes, for future 
discovery. SRK Consulting structural geology experts have completed their initial analysis, including core 
inspection pre-split, which Kula will build on. RQD testwork was also carried out on the core prior to cutting for 
geotechnical data for future use.

Kula Gold Limited 
- 6 - 
 
Marvel Loch Project – 100% 
Boomerang Kaolin Deposit (Southern Cross Region WA)  
The Company continued discussions to advance development of the large Boomerang Kaolin Deposit of 93.3Mt 
(indicated resource of 15.2Mt & inferred resource of 78.1Mt), near excellent infrastructure in Southern Cross 
WA. 
Engineering studies for downstream processing on site to produce metakaolin products for the Green 
Construction Industry has been completed. Mineralogical/metallurgical test work by Sedgman has also been 
completed confirming the suitability of the raw material for green cement as well as many uses such as paint, 
rubber and pesticide production. Discussions with potential acquirers and developers of the project continue 
with a view to monetising this asset. 
The Company has lodged applications for a Mining Licence ML77/1302 & a Miscellaneous Licence L77/359. 
During the year, the Company had a gold exploration focus with multiple UFF soil programmes on various 
prospects, Boomerang, Crayfish, Stingray, G-Star, 311 and Nevoria North Prospects. The Boomerang Gold 
Prospect was drilled with no significant gold mineralisation. 
 
Kirup Project – 70% (30% Sentinel Exploration Limited) 
The Company acquired a 70% interest in April 2023 and has obtained land access to some landowners, mapped, 
rock chipped and soil sampled these properties. During the prior year, the Company RC drilled the Mustang Gold 
Prospect after receiving an Exploration Incentive Scheme (EIS) allocation with a virgin discovery of 2m @ 2.3g/t 
gold from 24m an excellent first up result from 1 RC hole into an UFF soil anomaly. This was preceded by a strong 
3.5g/t rock chip at the eastern portion of the Mustang Prospect and will have more soil samples, mapping and 
rock chipping on this prospect. 
 
Brunswick Project – 100% 
The Brunswick Project is in the Western Gneiss Terrain within Australia’s Southwest and is prospective for 
lithium, Archean gold and copper, epithermal gold (Donnybrook Gold Mine Prospect). Incredibly overlooked 
area, given the prospective geology, for example, the most recent material drilling programme in the project 
area was BHP in 1985 for gold under a ~$5m JV farm-in. 
Positive results from soil sampling and rock chip sampling at the Donnybrook Gold Mine Prospect (which hosts 
the historical Donnybrook Gold Mine) revealed a strong, continuous gold-in-soil anomaly of over 250m wide and 
extending over 650m along strike (open in both directions) that require ongoing investigation.  
The Company has recognised two new gold prospect areas, Jarvis and Camilleri, where historical gold records for 
the Camilleri (Donnybrook) Mine had production of 236.7 ounces of gold from 51.3 tonnes of material extracted 
(146g/t gold). Geologically speaking, the Jarvis Prospect has numerous shafts, 4 ex-Metana Minerals NL 
percussion holes that drilled wet sample in that area including one hole that entered into one of the old shafts. 
This prospect also has a historical 500ppm soil sample from the same company.  
 
Southern Cross Project (Southern Cross, WA) 100% 
During the year the Company focused on its gold projects but is optimist if the lithium price recovers to advance 
the Nadia, Sasha and Taliah Prospects with an emphasis on lithium exploration seeking mineralised pegmatites. 
All three prospects are now at a drill ready stage and the Company notes the announcement by Mineral 
Resources Ltd about establishing a lithium processing facility at the Lake Johnston Lithium Hub. 
 
Westonia Gold Project (Southern Cross, WA) 100% 
Moving forward the Company will UFF soil sample around the known 1.85g/t gold in a quartz vein rock sample 
from a lateritic breakaway as it appears the Westonia Project is situated on the same structural system as the 
2Moz operating Edna May Gold Mine less than 5km away.   
 
 
 

Kula Gold Limited 
- 7 - 
 
Changes in state of affairs 
There was no significant change in the state of affairs of the Group during the financial year. 
 
Dividends 
There were no dividends paid or recommended during the financial year ended 31 December 2024 or 31 
December 2023. 
 
Subsequent events 
Subsequent to the year under review, the Company undertook the following activities: 
 
 
On 6 January 2025, the Company announced a non-renounceable pro-rata entitlement offer to eligible 
shareholders on the basis on one fully paid ordinary share for every two fully paid ordinary shares held 
at an issue price of $0.005 to raise approximately $1,600,000 before costs. 
 
 
On 22 January 2025, the Company announced that it has formed a joint venture that has applied for an 
exploration licence in Malawi, known as the Wozi Niobium Project, and that the Malawi Government’s 
Mining and Minerals Regulatory Authority has recommended the grant, subject to completion of an 
environmental study. 
 
Kula 75% and Manager, African Rare Metals Pty Ltd holds a 25% free carried interest for US$100,000 
then may contribute or dilute to a 10% free carried interest until a decision to mine. The JV agreement 
includes a 2% Net Smelter Royalty, which the Company can acquire for A$10,000,000 at anytime and 
such right is transferrable.  
 
 
On 31 January 2025, the Company issued 66,441,764 fully paid ordinary shares at an issue price of 
$0.005, raising $332,209 pursuant to the non-renounceable pro-rata entitlement offer announced on 6 
January 2025. The Company has 3 months from the closing date to place any shortfall from the offer. 
 
 
On 27 February 2025, the Company issued 211,600,000 fully paid ordinary shares at an issue price of 
$0.005, raising an additional $1,058,000 before costs under the shortall of the non-renounceable pro-
rata entitlement offer on 6 January 2025. The Company will pay a capital raising fee of 6% plus GST 
together with 20,000,000 unlisted options exercisable at $0.015 on or before 31 May 2027 to the lead 
manager of the shortfall offer. 
 
 
On 27 February 2025, the Company issued 27,500,000 unlisted options exercisable at $0.015 on or 
before 31 May 2027. 20,000,000 options were issued to the Lead Manager of the shortfall offer and 
7,500,000 were issued under the Employee Incentive Option Plan. 
 
Other than the above, there has not been any matter or circumstance occurring subsequent to the end of the 
financial year that has significantly affected, or may significantly affect, the operations of the Group, the results 
of those operations, or the state of affairs of the Group in future financial years. 
 
Future developments 
The main focus of the Group for the year ahead is gold exploration in Western Australia, niobium exploration in 
Malawi and to continue development of the Boomerang Kaolin Deposit.  
 
Environmental Regulations 
The Company is subject to the state and federal environmental regulation of Western Australia and Australia 
respectively and also environmental regulations in Malawi. The Company needs to ensure the appropriate 
standard of environmental care is achieved, and in doing so, that it is aware of and is in compliance with all 
environmental legislation.  The directors of the Company are not aware of any breach of environmental 
legislation for the period under review. 

Kula Gold Limited 
- 8 - 
 
Shares under option or issue on exercise of options 
Details of unissued shares under option as at the date of this report are: 
 
Quoted / unlisted 
Grant date 
Number of shares under option 
Exercise price of option 
Expiry date of options 
Unlisted  
27 February 2025 
20,000,0001 
$0.015 
31 May 2027 
Unlisted 
27 February 2025 
7,500,0002 
$0.015 
31 May 2027 
Unlisted 
12 July 2024 
7,500,0003 
$0.025 
30 June 2027 
Unlisted 
10 July 2024 
10,000,0004 
$0.015 
31 May 2027 
Unlisted 
19 January 2024 
5,000,0005 
$0.02 
1 July 2026 
Unlisted 
19 January 2024 
5,000,0005 
$0.05 
1 July 2027 
Unlisted 
1 February 2023 
1,300,0007 
$0.06 
1 July 2026 
Unlisted 
8 November 2022 
2,300,0007 
$0.06 
1 July 2026 
Unlisted 
7 November 2022 
6,000,0006 
$0.08 
7 November 2025 
Unlisted 
18 July 2022 
1,800,0007 
$0.06 
1 July 2026 
Unlisted 
16 August 2021 
575,0007 
$0.085 
1 August 2025 
Unlisted 
28 June 2021 
2,950,0007 
$0.06 
1 July 2026 
 
 
69,925,000 
 
 
1 Unlisted options were issued to Euroz Hartley (or nominee) for being Lead Manager to the Shortfall Offer under the non-
renounceable pro-rata entitlement offer announced on 6 January 2025. 
2 Unlisted options were granted to an eligible participant under the Employee Incentive Option Plan (‘EIOP’) approved at the 
Annual General Meeting held in 2024. 50% of these options will vest on 27 February 2025 and 50% will vest on 27 February 
2026.  
3 Unlisted options were granted to employees under the EIOP approved at the Annual General Meeting held in 2024. 50% 
vested on 12 July 2024 and 50% will vest on 12 July 2025. 
4 Unlisted options issued to Euroz Hartley (or nominee) for being Lead Manager to the Placement announced on 31 May 2024, 
following shareholder approval at the General Meeting held on 10 July 2024. 
5Unlisted options were granted to Mr Dawson, following shareholder approval obtained at the General Meeting held on 19 
January 2024. The unlisted options were granted to remunerate and incentivise Mr Dawson in his role as Managing Director 
and preserve cash resources of the Company. The unlisted options will vest when the Company’s market capitalisation 
reaches $12m.  
6 Unlisted options issued to Taylor Collison (or nominee) for being Lead Manager to the Placement announced on 19 
September 2022, following shareholder approval at the General Meeting held on 7 November 2022. 
7Unlisted options were granted to employees under the EIOP approved at the Annual General Meeting held in 2021. These 
options have fully vested.  
 
The holders of these options do not have the right, by virtue of the option, to participate in any share issue or 
interest issue of the Company or of any other body corporate or registered scheme. 
No fully paid ordinary shares were issued by the Company as a result of the exercise of options during or since 
the end of the financial year. 
Indemnification of officers and auditors 
During the financial year, the Company paid a premium in respect of a contract insuring the directors and all 
executive officers of the Company against a liability incurred as such a director or executive officer to the extent 
permitted by the Corporations Act. The contract of insurance prohibits disclosure of the nature of the liability 
and the amount of the premium. 
The Company has not otherwise, during or since the end of the financial year, except to the extent permitted by 
law, indemnified or agreed to indemnify an officer or auditor of the Company against a liability incurred as such 
an officer or auditor. 

Kula Gold Limited 
- 9 - 
 
Proceedings on behalf of company 
No person has applied for leave of Court to bring proceedings on behalf of the Company or intervene in any 
proceedings to which the Company is a party for the purpose of taking responsibility on behalf of the Company 
for all or any part of those proceedings. The Company was not a party to any such proceedings during the year. 
Directors’ meetings 
The following table sets out the number of directors’ meetings held during the financial year and the number of 
meetings attended by each director. The directors communicate regularly and pass most resolutions via circular 
resolutions. 
 
 
Directors'  
Meetings 
Audit  
Committee 
Nomination  
Committee 
Remuneration  
Committee 
Finance and 
Operations Committee 
 
Number 
eligible to 
attend 
Number 
Attended 
Number 
eligible to  
attend 
Number 
Attended 
Number 
eligible to  
attend 
Number 
Attended 
Number 
eligible to  
attend  
Number 
Attended 
Number 
eligible to  
attend  
Number 
Attended 
Mr Mark Stowell 
4 
4 
At the date of this report, the Remuneration, Audit, Nomination, and Finance and 
Operations Committees comprise the full Board of Directors. The Directors believe the 
Company is not currently of a size nor are its affairs of such complexity as to warrant the 
establishment of these separate committees. Accordingly, all matters capable of 
delegation to such committees are considered by the full Board of Directors. 
Mr Mark Bojanjac 
4 
4 
Mr Ric Dawson 
4 
4 
 
Non-audit services 
During the current and previous financial year, the Company’s auditor, Elderton Audit Pty Ltd, did not perform 
any services other than their statutory audits. Details of remuneration paid to the auditor can be found within 
the financial statements at note 23. 
In the event that non-audit services are provided by Elderton Audit Pty Ltd, the directors are satisfied that the 
provision of non-audit services are compatible with, and do not compromise, the auditor independence 
requirements of the Corporations Act 2001. These procedures include: 
 
All non-audit services will be reviewed and approved to ensure that they do not impact the integrity and 
objectivity of the auditor; and 
 
None of the services undermine the general principles relating to auditor independence as set out in 
APES 110 Code of Ethics for Professional Accountants issued by the Accounting Professional & Ethical 
Standards Board, including reviewing or auditing the auditor's own work, acting in a management or 
decision making capacity for the Company, acting as an advocate for the Company or jointly sharing 
economic risks and rewards. 
Auditor’s independence declaration 
The auditor’s independence declaration is included after this report on page 15. 
 
Rounding off of amounts 
The Company is a company of the kind referred to in ASIC Corporations (Rounding in Financials/Directors’ 
Reports) Instrument 2016/191, dated 24 March 2016, and in accordance with that Corporations Instrument 
amounts in this directors’ report are rounded off to the nearest dollar, unless otherwise indicated. 
 

Kula Gold Limited 
- 10 - 
 
Remuneration report 
 
This remuneration report, which forms part of the directors’ report, sets out information about the 
remuneration of Kula Gold Limited’s key management personnel for the financial year ended 31 December 2024. 
The term ‘key management personnel’ refers to those persons having authority and responsibility for planning, 
directing and controlling the activities of the Group, directly or indirectly, including any director (whether 
executive or otherwise) of the Group. The prescribed details for each person covered by this report are detailed 
below under the following headings: 
 
Key management personnel. 
 
Remuneration policy. 
 
Relationship between the remuneration policy any company performance. 
 
Remuneration of key management personnel. 
 
Key terms of employment contracts. 
Key management personnel  
The directors and other key management personnel of the Group during or since the end of the financial year 
were: 
 
Mr Mark Stowell  
Chairman 
 
Mr Ric Dawson  
Managing Director 
 
Mr Mark Bojanjac 
Director  
The named persons held their current position for the whole of the financial year and since the end of the 
financial year. 
Remuneration policy 
In assessing the remuneration of its key management personnel, the Group does not have in place any formal 
objectives, criteria or analysis; instead, it relies mainly on Board discussion. The adoption of this remuneration 
report is periodically recommended for approval by shareholders via a non-binding resolution at the Company’s 
Annual General Meeting.  
The Group’s policy regarding executive remuneration is that the executives are paid a commercial salary and 
benefits based on the market rate and experience designed to promote superior performance and long-term 
commitment to the Group. 
The Group’s executive compensation program has two principal components: base salary and incentive share 
options.  
Base salaries for all employees of the Group are established for each position based on individual and corporate 
performances. 
Non-Executive Director remuneration is not to exceed $300,000 per annum. Directors have no entitlement to 
termination payments in the event of removal for misconduct.  
Key management personnel are entitled to participate in the Group’s Employee Incentive Option Plan (‘EIOP’), 
which was approved by shareholders at the 2024 Annual General Meeting. The EIOP is designed to give each 
option holder an interest in preserving and maximising shareholder value. Such grants are determined by an 
informal assessment of an individual’s performance, level of responsibilities and the importance of his/her 
position and contribution to the Group. 

Kula Gold Limited 
- 11 - 
 
Relationship between the remuneration policy and company performance 
During the Group’s exploration and development phases of its business, the Board anticipates that the Company 
will retain earnings (if any) and other cash resources for the exploration and development of its resource projects. 
Accordingly, the Company does not currently have a policy with respect to the payment of dividends and returns 
of capital. Therefore, there was no relationship between the Board’s policy for determining, or in relation to, the 
nature during the current and previous financial years.  
The Board did not determine the nature and amount of remuneration of the key management personnel by 
reference to changes in the price at which shares in the Company traded between the beginning and end of the 
current and previous financial years.  
The table below sets out summary information about the Group’s earnings and movements in shareholder wealth 
for the five years to 31 December 2023: 
 
31 Dec   
2024 
31 Dec  
2023 
31 Dec 
2022 
31 Dec     
2021 
31 Dec 
2020 
Interest and other income  
306,100 
549,998 
447,157 
14,541 
36,601 
Profit/(loss) after tax 
(2,406,947) 
(2,594,866) 
(1,617,731) 
(1,645,522) 
(548,943) 
Share price at start of year 
0.015 
0.025 
0.048 
0.041 
0.037 
Share price at end of year 
0.006 
0.015 
0.025 
0.048 
0.041 
Basic and diluted profit/(loss)  
(0.43) 
(0.69) 
(0.64) 
(0.87) 
(0.53) 
 
Remuneration of key management personnel 
The table of benefits and payment details, in respect to the financial year, the components of remuneration for each 
member of the key management personnel of the Group: 
2024 
 
Group 
Key  
Management  
Personnel 
Short-term employee benefits 
Post-  
employment 
benefits 
Long-
term  
employee 
benefits 
Share- 
based payments 
Total 
Director 
fees 
Cash bonus 
Non-
monetary 
Consulting 
fees 
Super- 
annuation 
Long 
service  
Equity 
Options 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
Mr Mark Stowell 
9,000 
- 
- 
48,438 
1,012 
- 
- 
- 
58,450 
Mr Ric Dawson 
6,000 
- 
- 
142,500 
16,745 
- 
- 
- 
165,245 
Mr Mark Bojanjac 
6,000 
- 
- 
24,000 
675 
- 
- 
- 
30,675 
 
21,000 
- 
- 
214,938 
18,432 
- 
- 
- 
254,370 
 
 
 
2023 
 
Group 
Key  
Management  
Personnel 
Short-term employee benefits 
Post-  
employment 
benefits 
Long-
term  
employee 
benefits 
Share- 
based payments 
Total 
Director 
fees 
Cash bonus 
Non-
monetary 
Consulting 
fees 
Super- 
annuation 
Long 
service  
Equity 
Options 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
Mr Mark Stowell 
9,000 
- 
- 
41,250 
968 
- 
- 
- 
51,218 
Mr Ric Dawson1 
1,210 
- 
- 
150,000 
15,375 
- 
- 
- 
166,585 
Mr Mark Bojanjac 
6,000 
- 
- 
24,000 
645 
- 
- 
- 
31,245 
Mr John Hannaford2 
4,790 
- 
- 
18,600 
512 
- 
- 
- 
23,902 
 
21,000 
- 
- 
234,450 
17,500 
- 
- 
- 
272,950 
1 Appointed 18 October 2023 
2 Resigned 24 October 2022 

Kula Gold Limited 
- 12 - 
 
Bonuses and share-based payments granted as compensation for the current financial year 
There were no cash bonuses paid during the current or previous financial year and there are no set performance 
criteria for achieving cash bonuses. 
On 25 January 2024, the Company issued 5,000,000 unlisted options exercisable at $0.02 on or before 1 July 
2026 and 5,000,000 unlisted options exercisable at $0.05 on or before 1 July 2027, following shareholder 
approval obtained at the General Meeting held on 19 January 2024, to Mr Dawson following his appointment as 
Managing Director. The unlisted options were granted to remunerate and incentivise Mr Dawson and preserve 
cash resources of the Company. The options will vest when the Company’s market capitalisation reaches 
$12,000,000. 
There was no remuneration paid to key management personnel linked to performance during the previous 
financial year. 
No key management personnel appointed during the current or previous financial year received a payment as 
part of his consideration for agreeing to hold the position. 
Employee incentive option plan 
Kula Gold Limited operates an ownership-based Employee Incentive Option Plan (‘EIOP’) for executives and 
senior employees of the Group. 
In accordance with the terms and conditions of the EIOP, as approved by shareholders at the 2024 Annual 
General Meeting, each unlisted option converts to fully paid ordinary shares on a one-for-one basis. 
No amounts are paid or payable by the recipient on receipt of the unlisted option. The options carry neither 
rights to dividends nor voting rights. Options may be exercised at any time from the date of vesting to the date 
of their expiry. There is no performance based formula to calculate the number of options each executive or 
senior employee receives. Options expire on the expiry date and any unvested options expire on the resignation 
of the executive or senior employee. As at the date of this report the Group had 23,925,000 unlisted options on 
issue under the EIOP leaving a capacity of 398,096. 
 
Terms and conditions of share-based payments granted as at the date of this report: 
 
Option 
series 
Grant date 
Number of 
shares under 
option 
Grant date 
fair value 
Exercise price  
Expiry date 
options 
                   Vesting dates 
7 
27 Feb 2025 
7,500,000 
$0.003 
$0.015 
31 May 2027 
50% Vested  
50% vesting 27 Feb 2026 
6 
12 Jul 2024 
7,500,000 
$0.008 
$0.025 
30 June 2027 
50% vested  
50% vesting 12 Jul 2025 
5 
1 Feb 2023 
1,300,000 
$0.016 
$0.06 
1 July 2026 
100% vested 
4 
8 Nov 2022 
2,300,000 
$0.025 
$0.06 
1 July 2026 
100% vested 
3 
18 Jul 2022 
1,800,000 
$0.016 
$0.06 
1 July 2026 
100% vested 
2 
16 Aug 2021 
575,000 
$0.044 
$0.085 
1 August 2025 
100% vested 
1 
28 Jun 2021 
2,950,000 
$0.029 
$0.06 
1 July 2026 
100% vested 
 
There has been no alteration of the terms and conditions of the above share-based payment arrangements since 
the grant date. 
No share-based payments were granted as compensation to key management personnel during the current or 
previous financial year under the EIOP.  
No options were exercised during the current or previous financial years. No options lapsed during the financial 
year (2023: 1,000,000) as a result of the resignation of the executive or senior employee. 
Each option converts into one fully paid ordinary share of the Company.  
  
 

Kula Gold Limited 
- 13 - 
 
Key management personnel equity holdings 
Fully paid ordinary shares of Kula Gold Limited. 
Name 
Balance at     
1 Jan 2023 
Shares 
acquired 
Shares 
disposed 
Balance on 
resignation 
Balance at   
31 Dec 2023 
Shares 
acquired 
subsequent 
year-end1 
Balance at date of 
this report 
 
No. 
No. 
No. 
No. 
No. 
No. 
No. 
Mr Mark Stowell 
25,091,228
14,996,153
-
- 40,087,381
20,043,690
60,131,071 
Mr Ric Dawson 
2,500,000
1,100,000
-
- 
3,600,000
1,800,000
5,400,000 
Mr Mark Bojanjac 
3,750,000
1,500,000
-
- 
5,250,000
2,625,000
7,875,000 
1 On 31 January 2025, shares were issued at $0.005 per share as a result of the Directors taking their full 
entitlement in the non-renounceable pro-rata entitlement offer pursuant to the prospectus lodged on 6 
January 2025. 
Key terms of employment contacts 
 
The compensation for all Non-Executive Directors is not to exceed $300,000 p.a. 
 
Directors have no entitlement to termination payments in the event of removal for misconduct. 
 
As Managing Director, Mr Dawson was paid a monthly consulting fee of $12,500 + GST and 
superannuation. In December 2024, this monthly consulting fee was reduced to $5,000 + GST and 
superannuation to preserve the cash resources of the Company.  
 
Mr Dawson also receives directors’ fees of 6,000 per annum plus superannuation.   
 
On 25 January 2024, the Company issued 5,000,000 unlisted options exercisable at $0.02 on or before 
1 July 2026 and 5,000,000 unlisted options exercisable at $0.05 on or before 1 July 2027, following 
shareholder approval obtained at the General Meeting held on 19 January 2024. The unlisted options 
were granted to remunerate and incentivise Mr Dawson and preserve cash resources of the Company. 
The options will vest when the Company’s market capitalisation reaches $12,000,000. 
 
Loans with key management personnel of the Group 
On 27 September 2024, the Company entered a new loan facility agreement with Merchant Holdings Pty Ltd, a 
company controlled by Mr Mark Stowell. This agreement provided a loan facility for $500,000 available for draw 
down for 3 months from the date of the agreement. In terms of the agreement interest accrued at the rate of 7.65% 
per annum on the outstanding principal with a default interest rate of 20% should the loan facility not be repaid 
within 3 months. During the financial year, the loan was drawn down to $460,000 and subsequent to year-end drawn 
down to $607,218.45 and interest of $14,996.15 has been accrued to the date of this report. On 31 January 2025, 
the Company issued 21,176,966 fully paid ordinary shares at an issue price of $0.005 to entities related to Mr Mark 
Stowell via the non-renounceable pro rata entitlement offer prospectus lodged with ASIC and ASX on 6 January 
2025. On 28 February 2025, a cash payment of $164,105.82 was paid and on 6 March 2025, a cash payment of 
$10,000 was paid. As at 31 December 2024, the loan balance was $467,476.82 and at the date of this report the 
loan balance was $342,223.95. 
 
On 23 April 2024, the Company entered a loan facility agreement with Merchant Holdings Pty Ltd, a company 
controlled by Mr Mark Stowell. This agreement provided a loan facility for $100,000 available for draw down for 3 
months from the date of the agreement. In terms of the agreement interest accrued at the rate of 7.65% per annum 
on the outstanding principal with a default interest rate of 20% should the loan facility not be repaid within 3 
months. The loan was drawn down to $108,000 during the period and interest of $493 was accrued. Repayment of 
the loan in full occurred on 7 June 2024 via a cash payment of $36,493 and the issue of 9,000,000 fully paid ordinary 
shares at an issue price of $0.008 per share, shareholder approval was obtained at the Company’s Annual General 
Meeting held on 17 May 2024. 
 

Kula Gold Limited 
- 14 - 
 
 
Other transactions with key management personnel of the Group 
During the financial year, the Company leases premises at Suite 2, 20 Howard Street, Perth from an entity that is 
controlled by Mr Mark Stowell. The terms of this lease are set at a rate that is considered to be arms-length for 
comparable premises. The rent and outgoings paid for this premises during the financial year ended 31 December 
2024 was $37,348 (2023: $41,714). 
On 28 November 2022, the Company entered into a binding term sheet (‘Agreement’) with Sentinel Exploration 
Ltd (‘Sentinel’) to acquire a 70% interest in the lithium and related minerals in tenement E70/5452 (‘Kirup 
Project’). 
Mr Mark Stowell is a current director of both Sentinel and the Company and Mr Simon Adams is a current 
director of Sentinel and a previous director of the Company, resigning on 2 November 2022. As a result, this 
transaction was considered a related party transaction and was approved by shareholders at a General Meeting 
held on 31 March 2023. 
The consideration was a follows: 
 
$200,000 for the reimbursement of exploration expenditure costs; 
 
Issued 12,000,000 fully paid ordinary shares at a deemed value of $0.016 per share, subject to a 12-
month escrow period from 4 April 2023; and 
 
A deferred consideration amount of $2,000,000 payable in fully paid ordinary shares issued at the 10-
day VWAP (commencing upon announcing the resource), with a minimum issue price of $0.04 on 
completion of a JORC maiden inferred resource on the Kirup Project of a minimum of 10mt of ore at a 
grade of 1% lithium (or metal equivalent) or greater within 5 years of the lithium rights being acquired.  
On 28 June 2024, a variation agreement was executed to: 
 
include 70% of all gold, base metal and non-LCT mineral rights acquired for the reimbursement of costs 
of $10,000 as a result of the new epithermal potential. 
 
The 2,000,000 performance rights that convert to fully paid ordinary shares in the capital of the 
Company to be cancelled as a result of the current market and economic conditions of lithium and 
replaced with a 1% net smelter royalty. 
As a result of the above variation made to the contingent consideration, being the 2,000,000 performance rights, 
the duty paid was reassessed and resulted in a refund of $104,069 received in the current financial year. 
 
This directors’ report, is signed in accordance with a resolution of directors made pursuant to s.298(2) of the 
Corporations Act 2001. 
 
On behalf of the Directors 
 
Mr Mark Stowell 
Chairman 
27 March 2025 
Perth, Western Australia 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
Auditor's Independence Declaration 
 
 
As the auditor for the audit of Kula Gold Limited for the year ended 31 December 2024, I declare that, to 
the best of my knowledge and belief, there have been: 
 
I) 
no contraventions of the independence requirements of the Corporations Act 2001 in 
relation to the audit; and 
II) 
no contraventions of any applicable code of professional conduct in relation to the audit. 
 
This declaration is made in respect of Kula Gold Limited and the entities it controlled during the year. 
 
 
 
Elderton Audit Pty Ltd 
 
 
 
Rafay Nabeel 
Director 
 
27 March 2025 
Perth 

 
 
Independent Audit Report to the members of Kula Gold Limited 
Report on the Audit of the Financial Report 
Opinion 
We have audited the financial report of Kula Gold Limited (the “Company”) and its subsidiaries (collectedly referred to as the 
“Group”) , which comprises the Consolidated Statement of financial position as at 31 December 2024, the Consolidated 
Statement of profit or loss and other comprehensive income, the Consolidated Statement of changes in equity and the 
Consolidated Statement of cash flows for the year then ended, and notes to the Financial Statements, including a summary 
of significant accounting policies, the consolidated entity disclosure statement and the directors' declaration. 
In our opinion, the accompanying financial report of the Group is in accordance with the Corporations Act 2001, including: 
 (i) giving a true and fair view of the Group's financial position as at 31 December 2024 and of its financial performance for 
the year then ended; and 
 (ii) complying with Australian Accounting Standards and the Corporations Regulations 2001. 
 
 
Basis for Opinion 
 
We conducted our audit in accordance with Australian Auditing Standards. Our responsibilities under those standards are 
further described as in the Auditor's Responsibilities for the Audit of the Financial Report section of our report. We are 
independent of the Group in accordance with the auditor independence requirements of the Corporations Act 2001 and the 
ethical requirements of the Accounting Professional and Ethical Standards Board's APES 110 Code of Ethics for Professional 
Accountants (the code) that are relevant to our audit of the financial report in Australia. We have also fulfilled our other ethical 
responsibilities in accordance with the Code. 
 
We confirm that the independence declaration required by the Corporations Act 2001, which has been given to the directors 
of the Company, would be in the same terms if given to the directors as at the time of this auditor's report. 
 
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion. 
 
 
Material Uncertainty related to Going Concern 
 
We draw attention to the Basis of Preparation note 2 (b) of the financial report, which describes that the ability of the Company 
and the Group to continue as a going concern is dependent on fund raising activities. As a result, there is a material 
uncertainty related to events or conditions that may cast significant doubt on the Group’s ability to continue as a going 
concern, and therefore whether it will realise its assets and extinguish its liabilities in the normal course of business and at 
the amounts stated in the financial report. 
 
Our opinion is not modified in respect of this matter. 
Key Audit Matters 
Key audit matters are those matters that, in our professional judgement, were of most significance in our audit of the financial 
report of the current period. These matters were addressed in the context of our audit of the financial report as a whole, and 
in forming our opinion thereon, and we do not provide a separate opinion on these matters. We have determined the matter 
described below to be a key audit matter to be communicated in our report. 
 
 
 
 

 
 
Capitalized Exploration 
 
Refer to accounting policy Note 2(y) and Note 12 for the accounting policy and disclosures in relation to Exploration and 
Evaluation Expenditure ($1,664,539) as at 30 December 2024. 
 
Key Audit Matter 
How our audit addressed the matter 
The 
Group 
has 
incurred 
significant 
exploration and evaluation expenditures 
which have been capitalised. As the carrying 
value 
of 
exploration 
and 
evaluation 
expenditures represents a significant asset 
of the Group, we considered it necessary to 
assess whether facts and circumstances 
existed to suggest that the carrying amount 
of this asset may exceed its recoverable 
amount. As a result, the asset was required 
to be assessed for impairment.  
 
We carried out the following work in accordance with the guidance set out 
in AASB 6 Exploration for and Evaluation of Mineral Resources:  
 
• 
We obtained evidence that the Group has valid rights to explore 
in the areas represented by the capitalised exploration and 
evaluation expenditures by obtaining independent searches of a 
sample of the Group’s tenement holdings; 
• 
We enquired with management and reviewed budgets to ensure 
that substantive expenditure on further exploration for and 
evaluation of the mineral resources in the Group’s areas of 
interest were planned;  
• 
We enquired with management, reviewed announcements made 
and reviewed minutes of directors’ meetings to ensure that the 
Group had not decided to discontinue activities in any of its areas 
of interest; 
• 
We enquired with management to ensure that the Group had not 
decided to proceed with development of a specific area of 
interest, to ensure the classification as exploration was 
appropriate. 
 
Based on our testing, no issues were noted. 
Other Information 
The directors are responsible for the other information. The other information obtained at the date of this auditor's report is 
included in the annual report but does not include the financial report and our auditor’s report thereon. 
Our opinion on the financial report does not cover the other information and accordingly we do not express any form of 
assurance conclusion thereon. 
In connection with our audit of the financial report, our responsibility is to read the other information and, in doing so, consider 
whether the other information is materially inconsistent with the financial report or our knowledge obtained in the audit or 
otherwise appears to be materially misstated. 
If, based on the work we have performed on the other information obtained prior to the date of this auditor's report, we 
conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing 
to report in this regard. 
Responsibilities of Directors for the Financial Report 
The directors of the Company are responsible for the preparation of the financial report that gives a true and fair view in 
accordance with Australian Accounting Standards and the Corporations Act 2001 and for such internal control as the 
directors determine is necessary to enable the preparation of the financial report that gives a true and fair view and is free 
from material misstatement, whether due to fraud or error. 
In preparing the financial report, the directors are responsible for assessing the Group’s ability to continue as a going concern, 
disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless the 
directors either intend to liquidate the Group or to cease operations, or have no realistic alternative but to do so. 
 
 

 
 
Auditor's Responsibilities for the Audit of the Financial Report 
Our objectives are to obtain reasonable assurance about whether the financial report as a whole is free from material 
misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion. Reasonable assurance 
is a high level of assurance but is not a guarantee that an audit conducted in accordance with Australian Auditing Standards 
will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered 
material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users 
taken on the basis of the financial report. 
As part of an audit in accordance with the Australian Auditing Standards, we exercise professional judgement and maintain 
professional scepticism throughout the audit. We also: 
• 
Identify and assess the risks of material misstatement of the financial report, whether due to fraud or error, design and 
perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide 
a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one 
resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of 
internal control. 
• 
Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate 
in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal control. 
• 
Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related 
disclosures made by the directors. 
• 
Conclude on the appropriateness of the directors’ use of the going concern basis of accounting and, based on the audit 
evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt 
on the Group’s ability to continue as a going concern.  If we conclude that a material uncertainty exists, we are required 
to draw attention in our auditor’s report to the related disclosures in the financial report or, if such disclosures are 
inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our 
auditor’s report. However, future events or conditions may cause the Group to cease to continue as a going concern. 
• 
Evaluate the overall presentation, structure and content of the financial report, including the disclosures, and whether the 
financial report represents the underlying transactions and events in a manner that achieves fair presentation. 
We communicate with the directors regarding, among other matters, the planned scope and timing of the audit and significant 
audit findings, including any significant deficiencies in internal control that we identify during our audit. 
We also provide the directors with a Statement that we have complied with relevant ethical requirements regarding 
independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear on 
our independence, and where applicable, related safeguards. 
From the matters communicated with the directors, we determine those matters that were of most significance in the audit 
of the financial report of the current period and are therefore the key audit matters. We describe these matters in our auditor’s 
report unless law or regulation precludes public disclosure about the matter or when, in extremely rare circumstances, we 
determine that a matter should not be communicated in our report because the adverse consequences of doing so would 
reasonably be expected to outweigh the public interest benefits of such communication. 
 
 
 
 
 
 

 
 
Report on the Remuneration Report 
We have audited the Remuneration Report included in pages 10 to 13 of the directors’ report for the year ended 31 December 
2024. The directors of the Kula Gold Limited are responsible for the preparation and presentation of the Remuneration Report 
in accordance with section 300A of the Corporations Act 2001. Our responsibility is to express an opinion on the 
Remuneration Report, based on our audit in accordance with Australian Auditing Standards. 
Opinion 
In our opinion, the Remuneration Report of Kula Gold Limited for the year ended 31 December 2024 complies with section 
300A of the Corporations Act 2001. 
 
 
 
Elderton Audit Pty Ltd 
 
 
 
 
 
 
 
Rafay Nabeel 
Director 
 
Perth 
27 March 2025 

Kula Gold Limited 
- 20 - 
 
Directors’ declaration 
 
The directors declare that: 
 
(a) in the directors’ opinion, there are reasonable grounds to believe that the Company will be able to pay its 
debts as and when they become due and payable;  
 
(b) in the directors’ opinion, the attached financial statements are in compliance with International Financial 
Reporting Standards, as stated in note 1 to the financial statements; 
 
(c) 
in the directors’ opinion, the attached financial statements and notes thereto are in accordance with the 
Corporations Act 2001, including compliance with accounting standards, the Corporations Regulations 2001  
and other mandatory professional reporting requirements and giving a true and fair view of the financial 
position as at 31 December 2024 and performance of the Group for the financial year ended on that date;  
 
(d) on the directors’ opinion, the attached consolidated entity disclosure statement is true and correct; and 
 
(e) the directors have been given the declarations required by s.295A of the Corporations Act 2001. 
 
Signed in accordance with a resolution of the directors made pursuant to s.295(5) of the Corporations Act 2001. 
 
On behalf of the Directors 
 
Mr Mark Stowell 
Chairman 
27 March 2025 
Perth, Western Australia 
 
 
 

Kula Gold Limited 
- 21 - 
 
Consolidated statement of profit or loss and other 
comprehensive income  
for the year ended 31 December 2024 
 
 
 
 
 
Consolidated 
 
 
Year ended 
 
Note 
31 December 
2024 
$ 
31 December 
2023 
$ 
Continuing operations 
 
 
 
Other income 
4 
306,100 
549,998 
Administration expenses 
 
(888,812) 
(896,140) 
Share-based payments 
20 
(36,987) 
(56,128) 
Exploration and evaluation expenditure 
 
(1,775,725) 
(2,191,033) 
Finance costs 
 
(11,523) 
(1,563) 
Loss before tax 
 
(2,406,947) 
(2,594,866) 
Income tax expense 
6 
- 
- 
Loss for the year 
5 
(2,406,947) 
(2,594,866) 
 
 
 
 
Other comprehensive expense 
Items that will not be reclassified subsequently to profit or loss 
 
- 
- 
Items that may be reclassified subsequently to profit or loss 
 
- 
- 
Total other comprehensive loss for the year 
 
- 
- 
Total comprehensive loss for the year 
 
(2,406,947) 
(2,594,866) 
 
 
 
 
Loss attributable to: 
 
 
 
Owners of Kula Gold Limited 
 
(2,406,947) 
(2,594,866) 
 
 
 
 
Total comprehensive loss attributable to: 
 
 
 
Owners of Kula Gold Limited 
 
(2,406,947) 
(2,594,866) 
 
Loss per share from continuing operations: 
Basic and diluted (cents per share) 
7 
(0.43) 
(0.69) 
 
 
The above consolidated statement of profit or loss and other comprehensive income should be read in conjunction with the 
accompanying notes. 

Kula Gold Limited 
- 22 - 
 
Consolidated statement of financial position 
as at 31 December 2024 
 
 
 
 
 
 
 
 
 
 
 
Consolidated 
 
 
 
 
Note  
31 December 
2024 
$ 
31 December 
2023 
$ 
ASSETS 
 
 
 
 
 
 
 
Current assets 
 
 
 
 
 
 
 
Cash and cash equivalents 
 
 
 
8 
 
39,314 
393,378 
Receivables and other assets 
 
 
 
9 
 
105,084 
122,505 
Total current assets 
 
 
 
 
 
144,398 
515,883 
 
 
 
 
 
 
 
 
Non-current assets 
 
 
 
 
 
 
 
Property, plant and equipment 
 
 
 
10 
 
35,092 
42,678 
Right-of-use assets 
 
 
 
11 
 
31,267 
52,112 
Exploration tenement 
 
 
 
12 
 
1,664,539 
1,460,337 
Total non-current assets 
 
 
 
 
 
1,730,898 
1,555,127 
Total assets 
 
 
 
 
 
1,875,296 
2,071,010 
 
 
 
 
 
 
 
 
LIABILITIES 
 
 
 
 
 
 
 
Current liabilities 
 
 
 
 
 
 
 
Trade and other payables 
 
 
 
13 
 
332,892 
396,060 
Borrowings 
 
 
 
14 
 
467,477 
- 
Provisions 
 
 
 
15 
 
10,761 
10,761 
Lease liability 
 
 
 
11 
 
11,522 
19,668 
Total current liabilities 
 
 
 
 
 
822,652 
426,489 
 
 
 
 
 
 
 
 
Non-current liabilities 
 
 
 
 
 
 
 
Lease liability 
 
 
 
11 
 
22,069 
33,591 
Total non-current liabilities 
 
 
 
 
 
22,069 
33,591 
Total liabilities 
 
 
 
 
 
844,721 
460,080 
Net assets 
 
 
 
 
 
1,030,575 
1,610,930 
 
 
 
 
 
 
 
Equity 
 
 
 
 
 
 
 
Share capital 
 
 
 
16 
 
157,942,785 
156,243,065 
Reserves 
 
 
 
17 
 
934,577 
807,705 
Accumulated losses 
 
 
 
 
 
(157,846,787) 
(155,439,840) 
Equity attributable to: 
 
 
 
 
 
 
 
Owners of Kula Gold Limited 
 
 
 
 
 
1,030,575 
1,610,930 
Non-controlling interest 
 
 
 
 
 
- 
- 
Total equity 
 
 
 
 
 
1,030,575 
1,610,930 
 
 
 
 
The above consolidated statement of financial position should be read in conjunction with the accompanying notes. 

Kula Gold Limited 
- 23 - 
 
Consolidated statement of changes in equity                                                                   
for the year ended 31 December 2024 
 
Consolidated 
 
 
Note 
Share capital 
Share-based 
payment 
reserve 
Consolidation 
reserve 
 
Total 
reserves 
Accumulated 
losses 
Total equity 
 
 
$ 
$ 
$ 
$ 
$ 
$ 
Balance at 1 January 2023 
 
155,506,534 
362,490 
404,366 
766,856 
(152,860,253) 
3,413,137 
Loss for the year 
 
- 
- 
- 
- 
(2,594,866) 
(2,594,866) 
Total other comprehensive loss for the year 
 
- 
- 
- 
- 
- 
- 
Total comprehensive loss for the year 
 
- 
- 
- 
- 
(2,594,866) 
(2,594,866) 
Issue of share capital  
16 
600,000 
- 
- 
- 
- 
600,000 
Issue of shares part consideration for the Kirup Project 
16 
192,000 
- 
- 
- 
- 
192,000 
Share issue costs 
16 
(55,469) 
- 
- 
- 
- 
(55,469) 
Share-based payments 
20 
- 
56,128 
- 
56,128 
- 
56,128 
Lapsed employee incentive options 
17 
- 
(15,279) 
- 
(15,279) 
15,279 
- 
Balance at 31 December 2023 
 
156,243,065 
403,339 
404,366 
807,705 
(155,439,840) 
1,610,930 
 
 
 
 
 
 
 
 
Balance at 1 January 2024 
 
156,243,065 
403,339 
404,366 
807,705 
(155,439,840) 
1,610,930 
Loss for the year 
 
- 
- 
- 
- 
(2,406,947) 
(2,406,947) 
Total other comprehensive loss for the year 
 
- 
- 
- 
- 
- 
- 
Total comprehensive loss for the year 
 
- 
- 
- 
- 
(2,406,947) 
(2,406,947) 
Issue of share capital 
16 
1,660,000 
- 
- 
- 
- 
1,660,000 
Issue of shares as consideration for the Mt Palmer Project 
16 
250,000 
- 
- 
- 
- 
250,000 
Share issue costs 
16 
(210,280) 
89,885 
- 
89,885 
- 
(120,395) 
Share-based payments  
20 
- 
36,987 
- 
36,987 
- 
36,987 
Balance at 31 December 2024 
 
157,942,785 
530,211 
404,366 
934,577 
(157,846,787) 
1,030,575 
The above consolidated statement of changes in equity should be read in conjunction with the accompanying notes. 

Kula Gold Limited 
- 24 - 
 
Consolidated statement of cash flows                                   
for the year ended 31 December 2024 
 
 
 
 
 
 
 
 
 
 
 
Consolidated 
 
 
 
 
 
 
Year ended 
 
 
 
Note 
 
31 December 
2024 
$ 
31 December 
2023 
$ 
Cash flows from operating activities 
 
 
 
 
 
 
 
Payments to suppliers and employees 
 
 
 
 
(719,127) 
(967,866) 
Net cash used in operating activities 
8 
 
 
(719,127) 
(967,866) 
 
 
 
 
 
 
 
 
Cash flows from investing activities 
 
 
 
 
 
 
 
Purchases of property, plant and equipment 
 
10 
 
 
(2,467) 
(2,000) 
Payments for exploration and evaluation expenditure 
 
 
 
 
(1,909,951) 
(1,884,892) 
Research and development grant 
 
4 
 
 
187,628 
938,179 
Refund of duties paid on acquisition of Kirup 
 
4 
 
 
104,069 
- 
Interest income 
 
4 
 
 
179 
1,119 
Net cash used in investing activities 
 
 
 
(1,620,542) 
(947,594) 
 
 
 
 
 
 
 
 
Cash flows from financing activities 
 
 
 
 
 
 
 
Proceeds from issue of shares 
 
16 
 
 
1,574,000 
600,000 
Payment of share issue costs 
 
16 
 
 
(120,395) 
(55,469) 
Proceeds from loans and borrowings 
 
 
 
 
568,000 
- 
Repayment of loans and borrowings 
 
 
 
 
(36,000) 
- 
Net cash provided by financing activities 
 
 
 
1,985,605 
544,531 
 
 
 
 
 
 
 
 
Net decrease in cash and cash equivalents 
 
 
(354,064) 
(1,370,929) 
Cash and cash equivalents at the beginning of the year 
 
 
393,378 
1,764,307 
Cash and cash equivalents at the end of the year                       8 
 
 
39,314 
393,378 
 
 
 
The above consolidated statement of cash flows should be read in conjunction with the accompanying notes. 

Kula Gold Limited 
- 25 - 
 
Notes to the consolidated financial statements                           
for the year ended 31 December 2024 
1. 
General information 
Kula Gold Limited (‘Kula Gold’ or the ‘Company’) is an exploration stage company engaged in the acquisition 
and exploration of mineral properties, principally located in Western Australia. The Company and its 
subsidiaries (the ‘Group’) have not yet determined whether its mineral properties contain reserves that 
are economically recoverable. 
 
Kula Gold is a company limited by shares incorporated and registered in Australia whose ordinary shares 
are publicly traded on the Australian Securities Exchange (‘ASX’) under ticker code (ASX: KGD). The address 
of the registered office is Suite 2, 20 Howard Street, Perth, Western Australia 6000. The financial report of 
the Group for the year ended 31 December 2024 was authorised for issue in accordance with a resolution 
of the directors on 27 March 2025. 
 
2. 
Basis of preparation and significant accounting policies 
(a) Statement of compliance 
These consolidated financial statements as at and for the year ended 31 December 2024 have been 
prepared in accordance with Australian equivalents to International Financial Reporting Standards 
(“AIFRS”), other pronouncements of the Australian Accounting Standards Board (“AASB”), Australian 
Accounting Interpretations and the Corporations Act 2001. Compliance with AIFRS also ensures that the 
consolidated financial statements are in compliance with International Financial Reporting Standards 
(including interpretations). 
 
(b) Basis of preparation 
The financial report is a general-purpose financial report, which has been prepared in accordance with 
Australian Accounting Standards, Australian Accounting Interpretations, other authoritative 
pronouncements of the Australian Accounting Standards Board (“AASB”) and the Corporations Act 2001. 
The Group is a for-profit entity for financial reporting purposes under Australian Accounting Standards. 
Except for cash flow information, the financial report has been prepared on an accrual basis and is based 
on historical costs, modified, where applicable, by the measurement at fair value of selected non-current 
assets, financial assets and financial liabilities. Material accounting policies adopted in preparation of this 
financial report are presented below and have been consistently applied unless otherwise stated. 
i. New or amended Accounting Standards and Interpretations adopted 
The Group has adopted all of the new or amended Accounting Standards and Interpretations issued by 
the Australian Accounting Standards Board that are mandatory for the current reporting period.  
Any new or amended Accounting Standards or Interpretations that are not yet mandatory have not been 
early adopted. 
ii. New Accounting Standards and Interpretations not yet mandatory or early adopted 
Australian Accounting Standards and Interpretations that have recently been issued or amended but are 
not yet mandatory, have not been early adopted by the Group for the annual reporting period ended 31 
December 2024. The Group has not yet assessed the impact of these new or amended Accounting 
Standards and Interpretations. 
iii. Going concern 
The financial statements have been prepared on the going concern basis, which contemplates the 
continuity of normal business activities and the realisation of assets and the settlement of liabilities in the 
normal course of business.

Kula Gold Limited 
- 26 - 
 
 
iii. Going concern (continued) 
As disclosed in the financial statements for the year ended 31 December 2024, the Group incurred a loss 
of $2,406,947 (2023: $2,594,866), had net cash outflows from operating activities of $719,127 (2023: 
$967,866), had cash inflows from financing activities of $1,985,605 (2023: $544,531). As at 31 December 
2024 the Group had net assets of $1,030,575 (2023: $1,610,930) and cash and cash equivalents of $39,314 
(2023: $393,378). 
 
As such, the directors believe that there are reasonable grounds to believe that the Group will be able to 
continue as a going concern, after consideration of the following factors: 
 
On 27 February 2025, the Company issued an additional 211,600,000 fully paid ordinary shares at an 
issue price of $0.005 to raise $1,058,000 before costs under the shortfall offer of the non-
renounceable pro rata entitlement offer prospectus announced on 6 January 2025. 
 
On 31 January 2025, the Company issued 66,441,764 fully paid ordinary shares at an issue price of 
$0.005 to raise $332,209 pursuant to the non-renounceable pro rata entitlement offer prospectus 
announced on 6 January 2025. 
 
On 22 March 2024, the Company entered into an At-the-Market Subscription Agreement (“ATM”) 
with Acuity Capital. The ATM provides the Company with up to $1,000,000 of standby equity capital 
over a period to 31 January 2029. As security for the ATM, the Company issued 24,000,000 fully paid 
ordinary shares to Acuity Capital at nil consideration. 
 
the current cash balance of the Company relative to its fixed and discretionary expenditure 
commitments; 
 
given the Company’s market capitalisation and the underlying prospects for the Company to raise 
further funds from the capital markets; and 
 
the fact that future exploration and evaluation expenditure is generally discretionary in nature (i.e. 
at the discretion of the directors having regard to an assessment of the Group’s eligible expenditure 
to date and the timing and quantum of its remaining earn-in expenditure requirements). Subject to 
meeting certain minimum expenditure commitments, further exploration activities may be slowed 
or suspended as part of the management of the Company’s working capital. 
 
Accordingly, the directors believe that the Group will be able to continue as a going concern and that it is 
appropriate to adopt the going concern basis in the preparation of the financial report.   
In the event that the Group is unsuccessful in the matters set out above in relation to obtaining future 
funds through capital raisings, there is a material uncertainty whether the Group will continue as a going 
concern, and therefore whether it will realise its assets and discharge its liabilities in the normal course of 
business, and at the amounts stated in the financial report. 
The financial report does not include any adjustments relating to the recoverability and classification of 
recorded assets or to the amounts and classification of liabilities that might be necessary should the Group 
not continue as a going concern. 
 
(c) Parent Entity Information 
In accordance with the Corporations Act 2001, these financial statements present the results of the Group 
only.   
 
(d) Basis of Consolidation 
The Company’s consolidated financial statements include Kula Gold Limited and its subsidiaries, all of 
which are wholly owned.  
Subsidiaries  
Subsidiaries are entities controlled by the Company. Consolidation accounting is applied for all of the 
Company’s wholly owned subsidiaries. Control is achieved when the Company: 
• 
Has power over the investee; 
• 
Is exposed, or has rights, to variable returns from its involvement with the investee; and 
• 
Has the ability to use its power to affect its returns.  
 
The Company reassesses whether or not it controls an investee, if facts and circumstance indicate that there 
are changes to one or more of the three elements of control listed above.

Kula Gold Limited 
- 27 - 
 
 
Subsidiaries (continued) 
Intercompany transactions, balances and unrealised gains on transactions between entities in the Group 
are eliminated. Unrealised losses are also eliminated unless the transaction provides evidence of the 
impairment of the asset transferred. Accounting policies of subsidiaries have been changed where 
necessary to ensure consistency with the policies adopted by the Group. 
Where the Group loses control over a subsidiary, it derecognises the assets including goodwill, liabilities 
and non-controlling interest in the subsidiary together with any cumulative translation differences 
recognised in equity. The Group recognises the fair value of the consideration received and the fair value 
of any investment retained together with any gain or loss in profit or loss. 
Joint Ventures 
A joint venture is a joint arrangement whereby the parties that have joint control of the arrangement have 
rights to the net assets of the arrangement. Investments in joint ventures are accounted for using the equity 
method. Under the equity method, the share of the profits or losses of the joint venture is recognised in 
profit or loss and the share of the movements in equity is recognised in other comprehensive income. 
Investments in joint ventures are carried in the statement of financial position at cost plus post-acquisition 
changes in the Group's share of net assets of the joint venture. Income earned from joint venture entities 
reduce the carrying amount of the investment. 
(e) Operating Segments 
Operating segments are presented using the 'management approach', where the information presented is 
on the same basis as the internal reports provided to the Chief Operating Decision Makers ('CODM'). The 
CODM is responsible for the allocation of resources to operating segments and assessing their 
performance. 
(f) Functional and Presentation Currency 
Items included in the financial statements of each of the Company’s operations are measured using the 
currency of the primary economic environment in which it operates (”the functional currency”). The 
financial statements are presented in Australian dollars, which is the Company's functional and 
presentation currency. 
(g) Use of Estimates and Judgements 
The preparation of the consolidated financial statements requires management to make judgements, 
estimates and assumptions that affect the application of accounting policies and the reported amounts 
of assets, liabilities, income and expenses. Actual results may differ from these estimates.  
Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting 
estimates are recognised in the period in which the estimates are revised and in any future periods 
affected. 
Critical Accounting Estimates 
Exploration and Evaluation Assets  
Estimates and assumptions made may change if new information becomes available. If, after expenditure 
is capitalised, information becomes available suggesting that the recovery of expenditure is unlikely, the 
amount capitalised is recognised in loss in the period that the new information becomes available.  
Impairment  
Assets, including property, plant and equipment and exploration and evaluation assets, are reviewed for 
impairment whenever events or changes in circumstances indicate that their carrying amounts exceed 
their recoverable amounts.  
The assessment of the fair value often requires estimates and assumptions such as discount rates, 
exchange rates, commodity prices, rehabilitation and restoration costs, future capital requirements and 
future operating performance. Changes in such estimates could impact recoverable values of these assets. 
Estimates are reviewed regularly by management.

Kula Gold Limited 
- 28 - 
 
 
Provisions and contingencies  
The amount recognised as a provision, including legal, contractual and other exposures or obligations, is 
the best estimate of the consideration required to settle the related liability, including any related interest 
charges, taking into account the risks and uncertainties surrounding the obligation. The Company assesses 
its liabilities and contingencies based upon the best information available, relevant tax laws and other 
appropriate requirements. 
Decommissioning and environmental provisions  
The Company’s operations are subject to environmental regulations in Australia. Upon any establishment 
of commercial viability of a site, the Company estimates the cost to restore the site following the 
completion of commercial activities and depletion of reserves. These future obligations are estimated by 
taking into consideration closure plans, known environmental impacts, and internal and external studies 
which estimate the activities and costs that will be carried out to meet the decommissioning and 
environmental provisions obligations. Amounts recorded for decommissioning and environmental 
provisions are based on estimates of decommissioning and environmental costs which may not be incurred 
for several years or decades. 
 
The decommissioning and environmental cost estimates could change due to amendments in laws and 
regulations in Australia. Additionally, actual estimated decommissioning and reclamation costs may differ 
from those projected. The Company is currently in the exploration stage and as such, there are no 
decommissioning and environmental reclamation costs at the year end. 
 
Fair value of share-based compensation 
The fair value of share-based compensation are subject to the limitation of the pricing models adopted that 
incorporates market data and involves uncertainty in estimates used by management in the assumptions. 
As the option pricing models require the input of highly subjective assumptions, including the volatility of 
share price, changes in subjective input assumptions can materially affect the fair value estimate. Where 
applicable, judgement is exercised on the probability and timing of achieving milestones related to the 
options. 
 
Critical Accounting Judgements 
Exploration and Evaluation Assets 
The application of the Company’s accounting policy for and determination on recoverability of capitalised 
exploration and evaluation expenditure requires judgement in determining whether future economic 
benefits are likely, which may be based on assumptions about future events or circumstances. 
Income taxes 
Judgement is required in determining whether deferred tax assets are recognised in the statements of 
financial position. Deferred tax assets, including those arising from unutilised tax losses, require 
management to assess the likelihood that the Company will generate taxable earnings in future periods, 
in order to utilise recognised deferred tax assets.  
Estimates of future taxable income are based on forecast cash flows from operations and the application 
of existing tax laws in Australia. To the extent that future cash flows and taxable income differ significantly 
from estimates, the ability of the Company to realise the deferred tax assets recorded at the date of the 
statement of financial position could be impacted.  
Additionally, future changes in tax laws in Australia in which the Company operates could limit the ability 
of the Company to obtain tax deductions in future periods.  
Fair value measurement hierarchy 
The Group is required to classify all assets and liabilities, measured at fair value, using a three level 
hierarchy, based on the lowest level of input that is significant to the entire fair value measurement, being: 
Level 1: Quoted prices (unadjusted) in active markets for identical assets or liabilities that the entity can 
access at the measurement date. Level 2: Inputs other than quoted prices included within Level 1 that are 
observable for the asset or liability, either directly or indirectly and Level 3: Unobservable inputs for the 
asset or liability. Considerable judgement is required to determine what is significant to fair value and 
therefore which category the asset or liability is placed in can be subjective. The fair value of assets and 
liabilities classified as Level 3 is determined by the use of valuation models. 

Kula Gold Limited 
- 29 - 
 
 
Fair value measurement hierarchy (continued) 
These include discounted cash flow analysis or the use of observable inputs that require significant 
adjustments based on unobservable inputs. 
 
Estimation of useful lives of assets 
The Group determines the estimated useful lives and related depreciation and amortisation charges for its 
property, plant and equipment and finite life intangible assets. The useful lives could change significantly 
as a result of technical innovations or some other event. The depreciation and amortisation charge will 
increase where the useful lives are less than previously estimated lives, or technically obsolete or non-
strategic assets that have been abandoned or sold will be written off or written down. 
 
(h) Financial Instruments 
Financial assets and liabilities are recognised when the Company becomes party to the contractual 
provisions of the instrument. Financial assets are derecognised when the rights to receive cash flows from 
the assets have expired or have been transferred and the Company has transferred substantially all the 
risks and rewards of ownership. 
Effective Interest Method  
The effective interest method calculates the amortised cost of a financial instrument asset or liability and 
allocates interest income over the corresponding period. The effective interest rate is the rate that 
discounts estimated future cash receipts over the expected life of the financial asset or liability, or where 
appropriate, a shorter period. Income is recognised on an effective interest basis for debt instruments 
other than those financial assets classified as fair value through profit and loss.  
Loans and Receivables  
These assets are non-derivative financial assets with fixed or determinable payments that are not quoted 
in an active market. These assets are measured at amortised cost using the effective interest method. Any 
gains or losses on the realisation of receivables are included in profit or loss.  
Impairment of Financial Assets 
The Group recognises a loss allowance for expected credit losses on financial assets which are either 
measured at amortised cost or fair value through other comprehensive income. The measurement of the 
loss allowance depends upon the Group's assessment at the end of each reporting period as to whether 
the financial instrument's credit risk has increased significantly since initial recognition, based on 
reasonable and supportable information that is available, without undue cost or effort to obtain.  
Where there has not been a significant increase in exposure to credit risk since initial recognition, a 12-
month expected credit loss allowance is estimated. This represents a portion of the asset's lifetime 
expected credit losses that is attributable to a default event that is possible within the next 12 months. 
Where a financial asset has become credit impaired or where it is determined that credit risk has increased 
significantly, the loss allowance is based on the asset's lifetime expected credit losses. The amount of 
expected credit loss recognised is measured on the basis of the probability weighted present value of 
anticipated cash shortfalls over the life of the instrument discounted at the original effective interest rate.  
For financial assets measured at fair value through other comprehensive income, the loss allowance is 
recognised within other comprehensive income. In all other cases, the loss allowance is recognised in 
profit or loss. 
Other financial liabilities 
They are measured at amortised cost using the effective interest method. Any gains or losses in the 
realisation of other financial liabilities are included in profit or loss. 
Fair values 
Fair values of financial assets and liabilities are based upon quoted market prices available from active 
markets or are otherwise determined using a variety of valuation techniques and models using quoted 
market prices.

Kula Gold Limited 
- 30 - 
 
 
Fair values (continued) 
The Company has made the following classifications: 
 
(i) Long-Lived Asset Impairment  
Long-lived assets, which comprise exploration and evaluation assets and property, plant and equipment, 
are reviewed for impairment if events or changes in circumstances indicate that the carrying value may 
not be recoverable. 
The Company’s property, plant and equipment are assessed for indication of impairment at each financial 
position date.  
Exploration and evaluation assets are assessed for impairment when facts and circumstances suggest that 
the carrying amount of an exploration and evaluation asset may exceed its recoverable amount. Internal 
factors, such as budgets and forecasts, as well as external factors, such as future prices, costs and other 
market factors are also monitored to determine if indicators of impairment exist. If any indication of 
impairment exists, an estimate of the assets’ recoverable amount is calculated. The recoverable amount 
is determined for an individual asset, unless the asset does not generate cash inflows that are largely 
independent of those from other assets of the Company’s assets. If this is the case, the individual assets 
are grouped together into cash generating units (“CGU”) for impairment purposes. Such CGU’s represent 
the lowest levels for which there are separately identifiable cash inflows that are largely independent of 
the cash flows from other assets. 
If the carrying amount of the asset exceeds its recoverable amount, the asset is impaired and an 
impairment loss is charged to profit or loss so as to reduce the carrying amount to its recoverable amount 
(i.e. the higher of fair value less cost to sell and fair value in use). Fair value less cost to sell is the amount 
obtainable from the sale of an asset of CGU in an arm’s length transaction between knowledgeable, willing 
parties, less the costs of disposal. Value in use is determined as the present value of the future cash flows 
expected to be derived from an asset of CGU.  
Estimated future cash flows are calculated using estimated future prices, mineral reserves and resources 
and operating and capital costs. All assumptions used are those that an independent market participant 
would consider appropriate. The estimated future cash flows are discounted to their present value using 
a pre-tax discount rate that reflects current market assessments of the time value of money and the risks 
specific to the asset for which estimates of future cash flows have not been adjusted. 
(j) Decommissioning and Environmental Provisions  
The Company’s mineral exploration and development activities are subject to various Australian laws and 
regulations regarding the protection of the environment. As a result, the Company is expected to incur 
expenses to discharge its obligations under these laws and regulations. 
Decommissioning and environmental costs are estimated based on the Company’s interpretation of 
current regulatory and operating license requirements. Initially, a liability for a decommissioning and 
environmental provision is recognised as its fair value in the period in which it is incurred. Upon initial 
recognition of the liability, the corresponding decommissioning and environmental provision is added to 
the carrying amount of the related asset and the cost is amortised as an expense over the economic life 
of the asset using either the unit of production method or the straight-line method, as appropriate.  
(k) Revenue recognition 
The Group recognises interest revenue as interest accrues using the effective interest method. This is a 
method of calculating the amortised cost of a financial asset and allocating the interest income over the 
relevant period using the effective interest rate, which is the rate that exactly discounts estimated future 
cash receipts through the expected life of the financial asset to the net carrying amount of the financial 
asset.
Other assets 
Trade and other payables 
Loans and receivables 
Other liabilities 
All financial instruments are required to be measured at fair value on initial recognition. Fair value 
measurement for financial instruments and liquidity risk disclosures require a three hierarchy that 
reflects the significance of the inputs used in making the measurements. 
 

Kula Gold Limited 
- 31 - 
 
 
(l) Receivables 
Receivables are recognised at amortised cost, less any allowance for expected credit losses. 
(m) Trade and other payables 
These amounts represent liabilities for goods and services provided to the Group prior to the end of the 
financial year and which are unpaid. Due to their short-term nature they are measured at amortised cost 
and are not discounted. The amounts are unsecured and are usually paid within 30 days of recognition. 
(n) Current and non-current classification 
Assets and liabilities are presented in the statement of financial position based on current and non-current 
classification. 
An asset is classified as current when it is either expected to be realised or intended to be sold or consumed 
in the Group’s normal operating cycle, expected to be realised within 12 months after the reporting period 
or the asset is cash or cash equivalent unless restricted from being exchanged or used to settle a liability 
for at least 12 months after the reporting period. All other assets are classified as non-current. 
A liability is classified as current when it is either expected to be settled in the Group’s normal operating 
cycle, due to be settled within 12 months after the reporting period or there is no unconditional right to 
defer the settlement of the liability for at least 12 months after the reporting period. All other liabilities are 
classified as non-current. 
Deferred tax assets and liabilities are always classified as non-current.  
(o) Property, plant and equipment 
Plant and equipment is stated at historical cost less accumulated depreciation and impairment. Historical 
cost includes expenditure that is directly attributable to the acquisition of the items. 
Depreciation is calculated on a straight-line basis to write off the net cost of each item of property, plant 
and equipment (excluding land) over their expected useful lives as follows: 
Buildings and leasehold improvements 
25 years 
Motor vehicles 
3 years 
Plant and equipment 
6 years  
Furniture and fittings 
6 years 
The residual values, useful lives and depreciation methods are reviewed and adjusted if appropriate at each 
reporting date. 
An item of property, plant and equipment is derecognised upon disposal or when there is no future 
economic benefit to the Group. Gains and losses between the carrying amount and the disposed proceeds 
are taken to profit or loss. Any revaluation surplus reserve relating to the item disposed of is transferred 
directly to accumulated losses. 
(p) Borrowings 
Loans and borrowings are initially recognised at the fair value of the consideration received, net of 
transaction costs. They are subsequently measured at amortised cost using the effective interest method. 
(q) Employee benefits 
Short-term employee benefits. 
Liabilities for wages and salaries, including non-monetary benefits, annual leave and long services leave 
expected to be settled wholly within 12 months of the reporting date are measure at the amounts expected 
to be paid when the liabilities are settled. 
Other long-term employee benefits 
The liability for annual leave and long service leave not expected to be settled within 12 months of the 
reporting date are measured at the present value of expected future payments to be made in respect of 
services provided by employees up to the reporting date using the projected unit credit method. 
Consideration is given to expected future wage and salary levels, experience of employee departures and 
period of services. Expected future payments are discounted using market yields at the reporting date on 
corporate bonds with terms to maturity and currency that match, as closely as possible, the estimated 
future cash outflows.

Kula Gold Limited 
- 32 - 
 
 
Defined contribution superannuation expense 
Contributions to defined contribution superannuation plans are expensed in the period in which they are 
incurred. 
 
Share-based payments 
Equity-settled and cash-settled share-based compensation benefits are provided to employees. 
 
Equity-settled transactions are awards of shares, or options over shares, that are provided to employees in 
exchange for the rendering of services. Cash-settled transactions are awards of cash for the exchange of 
services, where the amount of cash is determined for reference to the share price. 
 
The cost of equity-settled transactions are measured at the fair value on grant date. Fair value is 
independently determined using either the Binomial or Black-Scholes option pricing model that takes into 
account the exercise price, the term of the option, the impact of dilution, the share price at grant date and 
expected price volatility of the underlying share, the expected dividend yield and the risk free interest rate 
for the term of the option, together with non-vesting conditions that do not determine whether the Group 
receives the services that entitle the employees to receive payment. No account is taken of any other 
vesting conditions. 
 
If the non-vesting condition is within the control of the Group or employee, the failure to satisfy the 
condition is treated as a cancellation. If the condition is not within the control of the Group or employee 
and is not satisfied during the vesting period, any remaining expense for the award is recognised over the 
remaining vesting period, unless the award is forfeited. 
 
If equity-settled awards are cancelled, it is treated as if it has vested on the date of cancellation, and any 
remaining expense is recognised immediately. If a new replacement award is substituted for the cancelled 
award, the cancelled and new award is treated as if they were a modification. 
 
(r) Share capital 
Ordinary shares are classified as equity. 
Incremental costs directly attributable to the issue of new shares or options are shown in equity as a 
deduction, net of tax, from the proceeds. 
 
(s) Income tax 
Current tax assets and liabilities for the current and prior periods are measured at the amount expected to 
be recovered from or paid to the taxation authorities. The tax rates and tax laws used to compute the 
amount are those that are enacted or substantively enacted by the balance date. 
 
Deferred income tax is provided on all temporary differences at the statement of financial position date 
between the tax bases of assets and liabilities and their carrying amounts for financial reporting purposes. 
 
Deferred income tax assets are recognised for all deductible temporary differences, carry-forward of 
unused tax assets and unused tax losses, to the extent that it is probable that taxable profit will be available 
against which the deductible temporary differences and the carry-forward of unused tax credits and 
unused tax losses can be utilised, except: 
 
• when the deferred income tax asset relating to the deductible temporary difference arises from the 
initial recognition of an asset or liability in a transaction that is not a business combination and, at the time 
of the transaction, affects neither the accounting profit nor taxable profit or loss; or

Kula Gold Limited 
- 33 - 
 
 
(s) Income tax (continued) 
 
• when the deductible temporary difference is associated with investments in subsidiaries, associates or 
interests in joint ventures, in which case a deferred tax asset is only recognised to the extent that it is 
probable that the temporary difference will reverse in the foreseeable future and taxable profit will be 
available against which the temporary difference can be utilised. 
 
The carrying amount of deferred income tax assets is reviewed at each balance date and reduced to the 
extent that it is no longer probable that sufficient taxable profit will be available to allow all or part of the 
deferred income tax asset to be utilised. 
 
Unrecognised deferred income tax assets are reassessed at each balance date and are recognised to the 
extent that it has become probable that future taxable profit will allow the deferred tax asset to be 
recovered. 
 
Deferred income tax assets and liabilities are measured at the tax rates that are expected to apply to the 
year when the asset is realised or the liability is settled, based on tax rates (and tax laws) that have been 
enacted or substantively enacted at the balance date. 
 
Income taxes relating to items recognised directly in equity are recognised in equity and not in profit or 
loss. 
 
Deferred tax assets and deferred tax liabilities are offset only if a legally enforceable right exists to set off 
current tax assets against current tax liabilities and the deferred tax assets and liabilities relate to the same 
taxable entity and the same taxation authority. 
 
(t) Good and Services Tax (GST) and other similar taxes 
Revenues, expenses and assets are recognised net of the amount of associated GST, unless the GST 
incurred is not recoverable from the tax authority. In this case it is recognised as part of the cost of the 
acquisition of the asset or as part of the expense. 
Receivables and payables are stated inclusive of the amount of GST receivable or payable. The net amount 
of GST recoverable from or payable to, the tax authority is included in other receivables or other payables 
in the statement of financial position. 
Cash flows are presented on a gross basis. The GST components of cash flows arising from investing or 
financing activities which are recoverable from, or payable to the tax authority, are presented as operating 
cash flows. 
Commitments and contingencies are disclosed net of the amount of GST recoverable from, or payable to, 
the tax authority.  
 
(u) Cash and cash equivalents 
For the purpose of presentation in the statement of cash flows, cash and cash equivalents includes cash on 
hand, deposits held at call with financial institutions, other short-term, highly liquid investments with 
original maturities of three months or less that are readily convertible to known amounts of cash and which 
are subject to an insignificant risk of changes in value.  
 
(v) Rounding of amounts 
The Company is a company of the kind referred to in ASIC Corporations (Rounding in Financials/Directors’ 
Reports) Instrument 2016/191, dated 24 March 2016 and in accordance with that Corporations Instrument 
amounts in the directors’ report and the financial statements are rounded off to the nearest dollar, unless 
otherwise indicated. 

Kula Gold Limited 
- 34 - 
 
 
(w) Leases 
The accounting policy for leases under AASB 16 is as follows: 
For any new contracts entered into as a lessee, the Company considers whether a contract is, or contains 
a lease. A lease is defined as ‘a contract, or part of a contract, that conveys the right to use an asset (the 
underlying asset) for a period of time in exchange for consideration’. 
To apply this definition the Company assesses whether the contract meets three key evaluations which are 
whether: 
 
the contract contains an identified asset, which is either explicitly identified in the contract or 
implicitly specified by being identified at the time the asset is made available to the Company; 
 
the Company has the right to obtain substantially all of the economic benefits from use of the 
identified asset throughout the period of use, considering its rights within the defined scope of the 
contract; and 
 
the Company has the right to direct the use of the identified asset throughout the period of use. The 
Company assesses whether it has the right to direct ‘how and for what purpose’ the asset is used 
throughout the period of use.  
At lease commencement date, the Company recognises a right-of-use asset and a lease liability on the 
balance sheet. The right-of-use asset is measured at cost, which is made up of the initial measurement of 
the lease liability, any initial direct costs incurred by the Company, an estimate of any costs to dismantle 
and remove the asset at the end of the lease, and any lease payments made in advance of the lease 
commencement date (net of any incentives received). The Company depreciates the right-of-use assets on 
a straight-line basis from the lease commencement date to the earlier of the end of the useful life of the 
right-of-use asset or the end of the lease term. The Company also assesses the right-of-use asset for 
impairment when such indicators exist.  At the commencement date, the Company measures the lease 
liability at the present value of the lease payments unpaid at that date, discounted using the interest rate 
implicit in the lease if that rate is readily available or the Company’s incremental borrowing rate. 
Lease payments included in the measurement of the lease liability are made up of fixed payments 
(including in substance fixed), variable payments based on an index or rate, amounts expected to be 
payable under a residual value guarantee and payments arising from options reasonably certain to be 
exercised.  Subsequent to initial measurement, the liability will be reduced for payments made and 
increased for interest.  It is remeasured to reflect any reassessment or modification, or if there are changes 
in in-substance fixed payments. When the lease liability is remeasured, the corresponding adjustment is 
reflected in the right-of-use asset, or profit and loss if the right-of-use asset is already reduced to zero.  The 
Company has elected to account for short-term leases and leases of low-value assets using the practical 
expedients. Instead of recognising a right-of-use asset and lease liability, the payments in relation to these 
are recognised as an expense in profit or loss on a straight-line basis over the lease term. Lease liabilities 
are shown directly on the statement of financial position (current and non-current). 
 
(x) Provisions 
Provisions are recognised when the Company has a present legal or constructive obligation as a result of 
past events, it is probable that an outflow of resources will be required to settle the obligation and the 
amount has been reliably estimated. Provisions are not recognised for future operating losses. 
Where there are a number of similar obligations, the likelihood that an outflow will be required in 
settlement is determined by considering the class of obligations as a whole. A provision is recognised even 
if the likelihood of an outflow with respect to any one item included in the same class of obligations may 
be small. 
Provisions are measured at the present value of management's best estimate of the expenditure required 
to settle the present obligation at the reporting date. The discount rate used to determine the present 
value reflects current market assessments of the time value of money and the risks specific to the liability. 
The increase in the provision due to the passage of time is recognised as interest expense.

Kula Gold Limited 
- 35 - 
 
(y) Exploration and evaluation expenditure 
Exploration and evaluation costs related to an area of interest are expensed as incurred except where they 
may be carried forward as an item in the statement of financial position where the rights of tenure of an 
area are current and one of the following conditions is met: 
 
the costs are expected to be recouped through successful development and exploitation of the area 
of interest, or alternatively, by its sale; or 
 
exploration and/or evaluation activities in the area of interest have not at the reporting date reached 
a stage which permits a reasonable assessment of the existence or otherwise of economically 
recoverable reserves, and active and significant operations in, or in relation to, the area of interest 
is continuing. 
Exploration and evaluation expenditure is written-off when it fails to meet at least one of the conditions 
outlined above or an area of interest is abandoned. Exploration and evaluation assets are assessed for 
impairment when facts and circumstances suggest that the carrying amount of an exploration and 
evaluation asset may exceed its recoverable amount. When facts and circumstances suggest that the 
carrying amount exceeds the recoverable amount, the impairment loss will be measured in accordance 
with the Company’s impairment policy (note 2(i)). 
 
3. 
Operating segments 
The Company has determined that it operates in one operating segment, being exploration in Western 
Australia and this is the basis on which internal reports are provided to the directors for assessing 
performance and determining the allocation of resources in the Company.  Accordingly, the financial results 
of the segment are equivalent to the financial statements of the Company as a whole. 
4. 
Other income 
 
2024 
2023 
 
$ 
$ 
ATO – GST & fuel tax credits 
14,224 
- 
Research and development government grant 
187,628 
548,879 
Refund of duties paid on acquisition of Kirup  
104,069 
- 
Interest on term deposit 
179 
1,119 
 
306,100 
549,998 
        
5.     Loss for the year 
 
2024 
2023 
 
$ 
$ 
Other income 
(306,100) 
(549,998) 
Depreciation 
 
 
          Furniture and fittings 
10,053 
11,847 
          Right-of-use-assets 
20,845 
10,422 
Employee benefit expenses 
434,540 
413,581 
Share-based payments 
36,987 
56,128 
Professional and consulting expenses 
119,730 
183,364 
Exploration and evaluation expenditure 
1,775,725 
2,191,033 
Interest  
 
 
          Right-of-use-assets 
2,663 
1,563 
          Insurance funding 
1,385 
- 
          Loans and borrowings 
7,475 
- 
Other administration expenses 
303,644 
276,926 
 
2,406,947 
2,594,866 

Kula Gold Limited 
- 36 - 
 
6.     Income tax 
 
2024 
2023 
 
$ 
$ 
The prima facie income tax benefit on the loss before income tax 
from continued operations reconciles to income tax:  
 
 
Loss before income tax 
(2,406,947) 
(2,594,866) 
Corporate tax rate 
25% 
25% 
Tax at the corporate tax rate 
(601,737) 
(648,716) 
Tax effect of expenses that are not deductible in determining taxable profit 
27,407 
(3,770) 
Tax effect of income that is not assessable in determining taxable profit 
(76,480) 
(137,220) 
Tax effect of deferred taxes that would be recognised directly in equity 
26,085 
25,445 
Change in unrecognised deferred tax assets 
624,725 
764,261 
 
- 
- 
The tax rates used in the above reconciliation is the corporate tax rate of 25% (2023: 25%) payable by 
Australian corporate entities on taxable profits under Australian tax law. 
Unrecognised deferred tax assets and liabilities as at 31 December 2024 comprise: 
 
 
Deferred tax 
assets 
Deferred tax 
liabilities 
Net 
 
$ 
$ 
$ 
Exploration and evaluation expenses 
 
(416,135) 
(416,135) 
Trade and other payables 
9,813 
- 
9,813 
Provisions 
2,690 
- 
2,690 
Unexpired blackhole expenditure 
64,197 
- 
64,197 
Unused tax losses 
2,771,792 
- 
2,771,792 
 
2,848,492 
(416,135) 
2,432,357 
The tax benefits of the above net deferred tax assets will only be obtained if: 
(a) The Company derives future assessable income of a nature and of an amount sufficient to enable the 
benefits to be utilised; 
(b) The Company continues to comply with the conditions for deductibility imposed by law; and 
(c) No changes in income tax legislation adversely affect the Company in utilising the benefits.

Kula Gold Limited 
- 37 - 
 
 
 
2024 
2023 
 
$ 
$ 
Loss for the year 
 
 
Loss for the year attributable to the owners of the Company used 
for the purposes of basic and diluted loss per share 
(2,406,947) 
(2,594,866) 
 
 
2024 
2023 
 
No. 
No. 
Number of shares 
 
 
Weighted average number of fully paid ordinary shares used for 
the purposes of basic and diluted loss per share 
561,935,124 
375,338,791 
 
 
2024 
2023 
 
$ 
$ 
Loss per share 
 
 
Basic and diluted loss per share 
(0.43) 
(0.69) 
 
Basic loss per share is calculated as the net loss attributable to owners of the Company, adjusted to 
exclude any costs of servicing equity (other than dividends) and preference share dividends, divided by 
the weighted average number of fully paid ordinary shares, adjusted for any bonus element. 
 
Diluted loss per share is the same as the basic loss per share as these are not dilutive transactions when 
the Company had a loss. 
 
 
 
 
2024 
2023 
 
$ 
$ 
 
Reconciliation of cash  
 
 
 
Cash at the end of the financial year as shown in the consolidated 
statement of cash flows is reconciled to items in the consolidated 
statement of financial position as follows:  
 
 
 
Cash and bank balances 
39,314 
393,378 
 
Cash comprises cash at bank and in hand. Cash equivalents are short term, highly liquid investments that 
are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes 
in value.   
 
For the purposes of the consolidated statement of cash flows, cash and cash equivalents consist of cash 
and cash equivalents as defined above, net of outstanding bank overdrafts. 
 
Cash at bank earns interest at floating rates based on daily bank deposit rates. 
 
Short-term deposits are made for varying periods of between one and three months, depending on the 
immediate cash requirements of the Company, and earn interest at the respective short-term deposit 
rates. 
 
The Group's exposure to interest rate risk and a sensitivity analysis for financial assets and liabilities is 
discussed in note 21. 
 
7. Loss per share 
8.   Cash and cash equivalents 

Kula Gold Limited 
 
- 38 - 
 
 
 
2024 
2023 
 
$ 
$ 
 
Cash flow information 
 
 
 
Reconciliation of cash flows from operating activities to the loss 
after income tax:  
 
 
 
Loss after income tax 
(2,406,947) 
(2,594,866) 
 
Increase in receivables and other assets 
33,899 
2,115 
 
Decrease/(Increase) in trade and other payables 
90,664 
(96,111) 
 
Share-based payments  
36,987 
56,129 
 
Depreciation 
30,898 
22,269 
 
Finance costs 
11,523 
1,563 
 
Interest income 
(179) 
(1,119) 
 
Research and development grant 
(187,628) 
(548,879) 
 
Refund on stamp duties payable on acquisition of Kirup 
(104,069) 
- 
 
Exploration expenditure – classified within investing activities 
1,775,725 
2,191,033 
 
Net cash used in operating activities 
(719,127) 
(967,866) 
 
Non-cash investing and financing activities 
 
On 10 July 2024, the Company issued 25,000,000 fully paid ordinary shares to Aurumin Limited for the 
acquisition of 51% of the Mt Palmer Project. 
 
Also on 10 July 2024, the Company issued 10,000,000 unlisted options exercisable at $0.015 expiring 31 May 
2027 to Euroz Hartleys Limited (or nominee) for lead manager and equity market services. 
 
On 22 March 2024, the Company issued 24,000,000 fully paid ordinary shares to Acuity Capital Investment 
Management Pty Ltd for the At-the-Market Subscription Agreement.   
 
During the previous financial year, the Company issued 12,000,000 fully paid ordinary shares to Sentinel 
Exploration Limited to acquire a 70% interest in the Kirup Project. 
 
 
 
2024 
2023 
 
$ 
$ 
 
GST receivable 
1,014 
18,882 
 
Prepayments and other receivables 
102,070 
103,623 
 
Security bond 
2,000 
- 
 
105,084 
122,505 
8.   Cash and cash equivalents (continued) 
9.   Receivables and other assets 

Kula Gold Limited 
 
- 39 - 
 
 
 
2024 
2023 
 
$ 
$ 
 
Cost 
 
 
 
At 1 January 
155,667 
153,667 
 
Additions 
2,467 
2,000 
 
At 31 December 
158,134 
155,667 
 
 
2024 
2023 
$ 
$ 
Accumulated depreciation 
 
 
At 1 January 
(112,989) 
(101,142) 
Charge for the year 
(10,053) 
(11,847) 
At 31 December 
(123,042) 
(112,989) 
 
Carrying amount 
 
At 31 December 2024 
35,092 
At 31 December 2023 
42,678 
At 1 January 2023 
52,525 
 
The Company leases office facilities in Perth, Western Australia. The lease runs for a period of three years 
with an option to renew at the end of the lease period. Lease payment amounts are set based on fixed annual 
increases. 
 
Right-of-use assets 
Right-of-use assets 
Depreciation charge 
 
2024 
$ 
2023 
$ 
2024 
$ 
2023 
$ 
Buildings 
31,267 
52,112 
20,845 
10,422 
 
Lease liabilities 
Lease liabilities 
Interest charge 
 
2024 
$ 
2023 
$ 
2024 
$ 
2023 
$ 
Current 
11,522 
19,668 
2,663 
1,563 
Non-current 
22,069 
33,591 
- 
- 
 
 
 
 
2024 
2023 
 
$ 
$ 
 
At 1 January 
1,460,337 
1,379,019 
 
Capitalised exploration & evaluation expenditure 
204,202 
81,318 
 
At 31 December 
1,664,539 
1,460,337 
 
The Company is of the view that the only tenement that meets the criteria of Aus 7.2 of AASB 6 is the 
Boomerang Kaolin Deposit on tenement E77/2621 where the Company has a 93.3mt resource (15.2mt 
indicated and 78.1mt inferred). The Company has lodged applications for mining licence M77/1302 and a 
miscellaneous licence L77/359.
10. Property, plant and equipment 
 
 
11. Right-of-use-assets and lease liabilities 
12. Exploration tenement 

Kula Gold Limited 
 
- 40 - 
 
 
2024 
2023 
 
$ 
$ 
 
Trade creditors and other payables 
293,639 
351,638 
 
Accruals 
39,080 
11,770 
 
Superannuation payable 
173 
32,652 
 
332,892 
396,060 
 
Trade and other payable are non-interest bearing and are usually settled within the lower of terms of trade 
or 30 days. The Group’s exposure to interest rate risk and a sensitivity analysis for financial assets and 
liabilities are disclosed in note 21. 
 
 
 
2024 
2023 
 
$ 
$ 
 
Current 
 
 
 
Loans from related parties (refer note 19) 
467,477 
- 
 
467,477 
- 
 
 
 
2024 
2023 
 
$ 
$ 
 
Current 
 
 
 
Provision for annual leave 
10,761 
10,761 
 
10,761 
10,761 
 
 
 
 
2024 
2023 
2024 
2023 
 
No. 
No. 
$ 
$ 
 
Fully paid ordinary shares 
643,211,921 
419,365,768 
157,942,785 
156,243,065 
 
Fully paid ordinary shares 
 
 
 
 
 
At the beginning of the year 
419,365,768 
361,211,921 
156,243,065 
155,506,534 
 
Share issue1 
25,000,000 
- 
250,000 
- 
 
Share placement2 
121,000,000 
- 
1,210,000 
- 
 
Share issue3 
24,000,000 
- 
- 
- 
 
Share placement4 
50,000,000 
- 
400,000 
- 
 
Share placement5 
3,846,153 
- 
50,000 
- 
 
Share placement6 
- 
46,153,847 
- 
600,000 
 
Share issue7 
- 
12,000,000 
- 
192,000 
 
Share issue costs2, 3, 6 
- 
- 
(210,280) 
(55,469) 
 
643,211,921 
419,365,768 
157,942,785 
156,243,065 
 
1 On 10 July 2024, the Company issued 25,000,000 fully paid ordinary shares at a deemed issue price of $0.01 per share 
to Aurumin Limited for the acquisition of 51% of the Mt Palmer Gold Mine Tenements and Mining Information. 
 
2 On 6 June 2024, the Company completed a share placement to sophisticated and professional investors issuing a total 
of 121,000,000 fully paid ordinary shares at an issue price of $0.01 per share to raise $1,210,000 before costs of $185,280, 
which includes the value of 10,000,000 unlisted options exercisable at $0.015 expiring 31 May 2027 issued to Euroz 
Hartleys Limited (or nominee).
13.   Trade and other payables 
14.   Borrowings 
15.   Provisions 
16.   Share capital 

Kula Gold Limited 
 
- 41 - 
 
3 On 22 March 2024, the Company announced that it had entered into an At-the-Market Subscription Agreement (“ATM”) 
with Acuity Capital. The ATM provides the Company with up to $1,000,000 of standby equity capital over the period to 
31 January 2029. As security for the ATM, the Company issued 24,000,000 fully paid ordinary shares to Acuity Capital at 
nil consideration. The Company paid a facility fee of $25,000 to Acuity Capital for the ATM. 
 
4On 29 February 2024, the Company completed the first tranche of a share placement to sophisticated and professional 
investors issuing a total of 39,250,000 fully paid ordinary shares at an issue price of $0.008 per share to raise $314,000. 
Following shareholder approval at the Annual General Meeting held on 17 May 2024, the Company completed the share 
placement and issued a total of 10,750,000 fully paid ordinary shares to directors at an issue price of $0.008 per share to 
raise a further $86,000. 
 
5 Following shareholder approval at a General Meeting held on 19 January 2024, the Company completed the share 
placement and issued at total of 3,846,153 fully paid ordinary shares to directors at an issue price of $0.013 per share to 
raise a further $50,000. 
 
6 On 21 November 2023, the Company completed the first tranche of a share placement to sophisticated and professional 
investors issuing a total of 46,153,847 fully paid ordinary shares at an issue price of $0.013 per share to raise $600,000 
before costs of $55,469.  
 
7 On 4 April 2023, following shareholder approval at a General Meeting held on 18 May 2023, the Company issued 
12,000,000 fully paid ordinary shares to Sentinel Exploration Limited at a deemed value of $0.016 per share as part 
consideration for a 70% interest in the lithium and related minerals in the Kirup Project, tenement E70/5452 (refer note 
19). 
Terms of fully paid ordinary shares 
Voting rights 
The Company has one class of fully paid ordinary shares which participates in dividends and any proceeds on 
the winding up of the Company in proportion to the number of shares held. 
At shareholder meetings, each fully paid ordinary share is entitled to one vote. 
 
 
 
2024 
2023 
 
$ 
$ 
 
Share-based payment reserve 
530,211 
403,339 
 
Consolidation reserve 
404,366 
404,366 
 
934,577 
807,705 
Movement in reserves 
Share-based payment reserve 
 
 
 
2024 
2023 
2024 
2023 
 
No. 
No. 
$ 
$ 
 
Unlisted options 
42,425,000 
14,925,000 
455,151 
403,339 
 
Unlisted options 
 
 
 
 
 
At the beginning of the year 
14,925,000 
14,625,000 
403,339 
362,490 
 
ESIP allotment1 
7,500,000 
- 
9,958 
- 
 
Option allotment2 
10,000,000 
- 
89,885 
- 
 
Option allotment3 
5,000,000 
- 
15,607 
- 
 
Option allotment3 
5,000,000 
- 
10,539 
- 
 
ESIP option allotment4 
- 
1,300,000 
883 
19,281 
 
ESIP option allotment5 
- 
- 
- 
24,391 
 
ESIP option allotment6 
- 
- 
- 
12,456 
 
Lapsed ESIP options6 
- 
(1,000,000) 
- 
(15,279) 
 
42,425,000 
14,925,000 
530,211 
403,339 
 
16.   Share capital (continued) 
17. Reserves 

Kula Gold Limited 
 
- 42 - 
 
1 On 12 July 2024, the Company issued 7,500,000 unlisted options to employee under the Employee Incentive Option Plan 
(“EIOP”). The unlisted options have an exercise price of $0.025 and an expiry date of 30 June 2027. 50% vested on grant 
of the options and the remaining 50% will vest on 12 July 2025. 
 
2 On 10 July 2024, the Company issued 10,000,000 unlisted options exercisable at $0.015 expiring 31 May 2027 to Euroz 
Hartleys Limited (or nominee) for Lead Manager of the share placement completed on 6 June 2024. 
 
3 At the General Meeting held on 19 January 2024, shareholder approval was obtained to issue 10,000,000 unlisted 
options to Mr Ric Dawson following his appointment as Managing Director on 18 October 2023. 
 
5,000,000 unlisted options have an exercise price of $0.02 and an expiry date of 1 July 2026 and 5,000,000 unlisted options 
have an exercise price of $0.05 and an expiry date of 1 July 2027. The unlisted options will vest once the Company’s 
market capitalisation reaches $12,000,000. 
 
4 On 2 February 2023, the Company issued 1,300,000 unlisted options to employees under the EIOP. The unlisted options 
have an exercise price of $0.06 and an expiry date of 1 July 2026. The unlisted options have fully vested. 
 
5 On 8 November 2022, the Company issued 2,300,000 unlisted options to employees under the EIOP. The unlisted  
   options have an exercise price of $0.06 and an expiry date of 1 July 2026. The unlisted options have fully vested. 
 
6 On 18 July 2022, the Company issued 2,800,000 unlisted options to employees under the EIOP. The unlisted options  
   have an exercise price of $0.06 and an expiry date of 1 July 2026. The unlisted options have fully vested. On 2 February   
   2023, 1,000,000 unlisted options lapsed as a result of the continued employment conditions. 
 
The share-based payment reserve is used to recognise the grant date fair value of unlisted options issued to 
directors, employees, contractors and stockbrokers. 
The fair value of the unlisted options are valued using the Black-Scholes option valuation methodology. For 
further information regarding the inputs and key variables for the valuation and the terms and conditions of 
the EIOP refer to note 20.   
Performance Rights 
On 4 April 2023, following shareholder approval at a General Meeting held on 18 May 2023, the Company 
issued 2,000,000 performance rights to Sentinel Exploration Limited as deferred consideration for a 70% 
interest in the lithium and related minerals in the Kirup Project, tenement E70/5452. 
On 28 June 2024, a variation agreement was executed to: 
 
Include 70% of all gold, base metals and non-LCT mineral rights acquired for the reimbursement of costs 
of $10,000 as a result of the new epithermal potential. 
 
The 2,000,000 performance rights that convert to fully paid ordinary shares in the capital of the Company 
to be cancelled as a result of the current market and economic conditions of lithium and replaced with a 
1% net smelter royalty. 
As a result of the above variation made to the contingent consideration, being the 2,000,000 performance 
rights, the duty paid was reassessed and resulted in a refund of $104,069 received in the current financial 
year. 
Consolidation reserve 
There was no movement in the consolidation reserve in the current or previous financial year. The balanced 
therefore remained at $404,366.  
17. Reserves (continued) 

Kula Gold Limited 
 
- 43 - 
 
2024 
2023 
 
$ 
$ 
 
Short-term employee benefits 
235,938 
255,450 
 
Post-employment benefits 
18,432 
17,500 
 
254,370 
272,950 
 
 
18. Key management personnel compensation 
 
The names and positions of key management personnel are as follows: 
 
 
Mr Mark Stowell                Chairman 
 
Mr Ric Dawson                   Managing Director – Appointed 18 October 2023. 
 
Mr Mark Bojanjac              Director 
 
Mr John Hannaford           Director – Resigned 18 October 2023. 
 
Information regarding individual directors and executives’ compensation and equity instrument disclosures as 
required by the Corporations Regulations 2M.3.03 is provided in the remuneration report in the directors’ 
report. 
19. Related party transactions 
 
Key management personnel 
 
Disclosures relating to Key Management Personnel are set out in note 18 and detailed remuneration disclosures 
are provided in the remuneration report in the directors’ report. 
 
Loans with key management personnel of the Group 
On 27 September 2024, the Company entered a new loan facility agreement with Merchant Holdings Pty Ltd, a 
company controlled by Mr Mark Stowell. This agreement provided a loan facility for $500,000 available for draw 
down for 3 months from the date of the agreement. In terms of the agreement interest accrued at the rate of 
7.65% per annum on the outstanding principal with a default interest rate of 20% should the loan facility not 
be repaid within 3 months. During the financial year, the loan was drawn down to $460,000 and subsequent to 
year-end drawn down to $607,218.45 and interest of $14,996.15 has been accrued to the date of this report. 
On 31 January 2025, the Company issued 21,176,966 fully paid ordinary shares at an issue price of $0.005 to 
entities related to Mr Mark Stowell via the non-renounceable pro rata entitlement offer prospectus lodged with 
ASIC and ASX on 6 January 2025. On 28 February 2025, a cash payment of $164,105.82 was paid and on 6 March 
2025, a cash payment of $10,000 was paid. As at 31 December 2024, the loan balance was $467,476.82 and at 
the date of this report the loan balance was $342,223.95. 
 
On 23 April 2024, the Company entered a loan facility agreement with Merchant Holdings Pty Ltd, a company 
controlled by Mr Mark Stowell. This agreement provided a loan facility for $100,000 available for draw down 
for 3 months from the date of the agreement. In terms of the agreement interest accrued at the rate of 7.65% 
per annum on the outstanding principal with a default interest rate of 20% should the loan facility not be repaid 
within 3 months. The loan was drawn down to $108,000 during the period and interest of $493 was accrued. 
Repayment of the loan in full occurred on 7 June 2024 via a cash payment of $36,493 and the issue of 9,000,000 
fully paid ordinary shares at an issue price of $0.008 per share, shareholder approval was obtained at the 
Company’s Annual General Meeting held on 17 May 2024. 
 
Other transactions with key management personnel of the Group 
During the financial year, the Company leases premises at Suite 2, 20 Howard Street, Perth from an entity that 
is controlled by Mr Mark Stowell. The terms of this lease are set at a rate that is considered to be arms-length 
for comparable premises. The rent and outgoings paid for this premises during the financial year ended 31 
December 2024 was $37,348 (2023: $41,714). 
 
 

Kula Gold Limited 
 
- 44 - 
 
The Company operates an ownership-based Employee Incentive Option Plan (‘EIOP’) for executives and senior 
employees of the Group. 
 
In accordance with the terms and conditions of the EIOP, as approved by shareholders at the 2024 Annual 
General Meeting, each unlisted option converts to fully paid ordinary shares on a one-for-one basis. 
 
No amounts are paid or payable by the recipient on receipt of the unlisted option. The holders of these unlisted 
options do not have the right, by virtue of the unlisted option, to participate in any share issue or interest issue 
of the Company or of any other body corporate or registered scheme. 
 
The options carry neither rights to dividends nor voting rights. Options may be exercised at any time from the 
date of vesting to the date of their expiry. There is no performance based formula to calculate the number of 
options each executive or senior employee receives. Options expire on the expiry date and any unvested 
options expire on the resignation of the executive or senior employee.  
 
No fully paid ordinary share were issued by the Company as a result of the exercise of unlisted options during 
or since the end of the financial year. 
19. Related party transactions (continued) 
 
 
Other transactions with key management personnel of the Group (continued) 
On 28 November 2022, the Company entered into a binding term sheet (‘Agreement’) with Sentinel 
Exploration Ltd (‘Sentinel’) to acquire a 70% interest in the lithium and related minerals in tenement 
E70/5452 (‘Kirup Project’). 
Mr Mark Stowell is a current director of both Sentinel and the Company and Mr Simon Adams is a current 
director of Sentinel and a previous director of the Company, resigning on 2 November 2022. As a result, 
this transaction was considered a related party transaction and was approved by shareholders at a 
General Meeting held on 31 March 2023. 
The consideration was a follows: 
 
$200,000 for the reimbursement of exploration expenditure costs; 
 
Issued 12,000,000 fully paid ordinary shares at a deemed value of $0.016 per share, subject 
to a 12-month escrow period from 4 April 2023; and 
A deferred consideration amount of $2,000,000 payable in fully paid ordinary shares issued at the 10-day 
VWAP (commencing upon announcing the resource), with a minimum issue price of $0.04 on completion 
of a JORC maiden inferred resource on the Kirup Project of a minimum of 10mt of ore at a grade of 1% 
lithium (or metal equivalent) or greater within 5 years of the lithium rights being acquired.  
On 28 June 2024, a variation agreement was executed to: 
 
include 70% of all gold, base metal and non-LCT mineral rights acquired for the 
reimbursement of costs of $10,000 as a result of the new epithermal potential. 
 
The 2,000,000 performance rights that convert to fully paid ordinary shares in the capital of 
the Company to be cancelled as a result of the current market and economic conditions of 
lithium and replaced with a 1% net smelter royalty. 
As a result of the above variation made to the contingent consideration, being the 2,000,000 performance 
rights, the duty paid was reassessed and resulted in a refund of $104,069 received in the current financial 
year. 
 
20. Share-based payments 

Kula Gold Limited 
 
- 45 - 
 
On 12 July 2024, the Company issued 7,500,000 unlisted options to employee under the Employee Incentive 
Option Plan (“EIOP”). The unlisted options have an exercise price of $0.025 and an expiry date of 30 June 
2027. 50% vested on grant of the options and the remaining 50% will vest on 12 July 2025. 
On 10 July 2024, the Company issued 10,000,000 unlisted options exercisable at $0.015 expiring 31 May 
2027 to Euroz Hartleys Limited (or nominee) for Lead Manager of the share placement completed on 6 June 
2024. 
On 25 January 2024, the Company issued 5,000,000 unlisted options exercisable at $0.02 on or before 1 
July 2026 and 5,000,000 unlisted options exercisable at $0.05 on or before 1 July 2027, following 
shareholder approval obtained at the General Meeting held on 19 January 2024. The unlisted options were 
granted to remunerate and incentivise Mr Dawson and preserve cash resources of the Company. The 
options will vest when the Company’s market capitalisation reaches $12,000,000. 
On 2 February 2023, the Company issued 1,300,000 unlisted options to employees under the EIOP. The 
unlisted options have an exercise price of $0.06 and an expiry date of 1 July 2026. The options have fully 
vested. 
Set out below are summaries of the unlisted options granted. 
2024 
EIOP 
Options 
series 
Grant date 
Expiry date 
Exercise 
price 
Balance at 
the start of 
the year 
Granted 
Exercised 
Expired/ 
forfeited/ 
lapsed 
Balance at 
the end of 
the year 
6 
12 Jul 24 
30 Jun 27 
$0.025 
- 
7,500,000 
- 
- 
7,500,000 
N/A 
10 Jul 24 
31 May 27 
$0.015 
- 
10,000,000 
- 
- 
10,000,000 
N/A 
19 Jan 24 
1 Jul 27 
$0.05 
- 
5,000,000 
- 
- 
5,000,000 
N/A 
19 Jan 24 
1 Jul 26 
$0.02 
- 
5,000,000 
- 
- 
5,000,000 
5 
2 Feb 23 
1 Jul 26 
$0.06 
1,300,000 
- 
- 
- 
1,300,000 
4 
8 Nov 22 
1 Jul 26 
$0.06 
2,300,000 
- 
- 
- 
2,300,000 
N/A 
7 Nov 22 
7 Nov 25 
$0.08 
6,000,000 
- 
- 
- 
6,000,000 
3 
18 Jul 22 
1 Jul 26 
$0.06 
1,800,000 
- 
- 
- 
1,800,000 
2 
16 Aug 21 
1 Aug 25 
$0.085 
575,000 
- 
- 
- 
575,000 
1 
28 Jun 21 
1 Jul 26 
$0.06 
2,950,000 
- 
- 
- 
2,950,000 
 
 
 
 
14,925,000 
27,500,000 
- 
- 
42,425,000 
Weighted average exercise price 
$0.069 
$0.025 
- 
- 
$0.04 
2023 
EIOP 
Options 
series 
Grant date 
Expiry date 
Exercise 
price 
Balance at 
the start of 
the year 
Granted 
Exercised 
Expired/ 
forfeited/ 
lapsed 
Balance at 
the end of 
the year 
5 
2 Feb 23 
1 Jul 26 
$0.06 
- 
1,300,000 
 
- 
1,300,000 
4 
8 Nov 22 
1 Jul 26 
$0.06 
2,300,000 
- 
- 
- 
2,300,000 
N/A 
7 Nov 22 
7 Nov 25 
$0.08 
6,000,000 
- 
- 
- 
6,000,000 
3 
18 Jul 22 
1 Jul 26 
$0.06 
2,800,000 
- 
- 
(1,000,000) 
1,800,000 
2 
16 Aug 21 
1 Aug 25 
$0.085 
575,000 
- 
- 
- 
575,000 
1 
28 Jun 21 
1 Jul 26 
$0.06 
2,950,000 
- 
- 
- 
2,950,000 
 
 
 
 
14,625,000 
   1,300,000 
- 
(175,000) 
14,925,000 
Weighted average exercise price 
$0.069 
$0.06 
- 
$0.064 
$0.069 
28,675,000 unlisted options exercisable at the end of the financial year (2023: 14,275,000). 
The weighted average share price during the financial year was $0.008 (2023: $0.017). 
The weighted average remaining contractual life of the unlisted options at the end of the financial year was 
1.90 years (2023: 2.21 years). 
20. Share-based payments (continued) 

Kula Gold Limited 
 
- 46 - 
For the unlisted options granted, the valuation model inputs used to determine the total fair value of 
$231,031 (2023: $20,165) at the various grant dates using the Black-Scholes Option Model are as follows: 
 
EIOP 
Options 
series 
Grant date 
Expiry date 
Share price 
at grant 
date 
Exercise 
price 
Expected 
volatility 
Risk-free 
interest 
rate 
Fair value 
at grant 
date 
Total fair 
value 
6 
12 Jul 24 
30 Jun 27 
$0.012 
$0.025 
140.14% 
4.05% 
$0.008 
$62,700 
N/A 
10 Jul 24 
31 May 27 
$0.012 
$0.015 
138.75% 
4.07% 
$0.009 
$89,885 
N/A 
19 Jan 24 
1 Jul 27 
$0.013 
$0.05 
125.83% 
3.93% 
$0.008 
$38,237 
N/A 
19 Jan 24 
1 Jul 26 
$0.013 
$0.02 
125.83% 
3.86% 
$0.008 
$40,209 
5 
2 Feb 23 
1 Jul 26 
$0.027 
$0.06 
109.67% 
3.24% 
$0.016 
$20,165 
4 
8 Nov 22 
1 Jul 26 
$0.0385 
$0.06 
107.10% 
3.70% 
$0.025 
$57,068 
N/A 
7 Nov 22 
7 Nov 25 
$0.038 
$0.08 
107.09% 
3.37% 
$0.02 
$120,109 
3 
18 Jul 22 
1 Jul 26 
$0.03 
$0.06 
93.65% 
3.21% 
$0.016 
$45,692 
2 
16 Aug 21 
1 Aug 25 
$0.066 
$0.085 
106.00% 
0.57% 
$0.044 
$26,683 
1 
28 Jun 21 
1 Jul 26 
$0.04 
$0.06 
107.71% 
0.79% 
$0.029 
$90,263 
For further details in relation to the EIOP terms and conditions refer to page 12 of the remuneration report. 
The total fair value of the unlisted options is expensed over the estimated vesting period. The share-based 
expense of $36,987 (2023: $56,128) was recognised in the consolidated statement of profit and loss and other 
comprehensive income for the year.  
The share-based expense of $89,885 for the unlisted options granted to Euroz Hartleys Limited (or nominee) 
for Lead Manager for the share placement completed on 6 June 2024 was recognised as share issue costs 
within equity. 
 
 
Floating 
Interest 
Rate 
$ 
Fixed 
Interest 
Rate 
$ 
Non-
interest 
Bearing  
$ 
2024  
Total 
$ 
Floating 
Interest 
Rate 
$ 
Fixed 
Interest 
Rate  
$ 
Non-
interest 
Bearing  
$ 
2023 
Total 
$ 
Financial Assets 
 
 
 
 
 
 
 
 
Cash and cash equivalents 
39,314 
- 
- 
39,314 
393,378 
- 
- 
393,378 
Total Financial Assets 
39,314 
- 
- 
39,314 
393,378 
- 
- 
393,378 
 
 
 
 
 
 
 
 
 
Financial Liabilities 
 
 
 
 
 
 
 
 
Trade and other payables 
- 
- 
(332,892) 
(332,892) 
- 
- 
(396,060) 
(396,060) 
Total Financial Liabilities 
- 
- 
(332,892) 
(332,892) 
- 
- 
(396,060) 
(396,060) 
Net Financial Liabilities 
39,314 
- 
(332,892) 
(293,578) 
393,378 
- 
(396,060) 
(2,682) 
20. Share-based payments (continued) 
21. Financial risk management 
 
Financial risk management policies 
 
This note presents information about the Group’s exposure to each of the risks below, its objectives, policies 
and procedures for measuring and managing risk including the management of capital. 
 
The Group’s financial instruments consist mainly of deposits with banks, short-term investments and accounts 
payable and receivable. The Group does not speculate in the trading of derivative instruments. 
 
A summary of the Group’s financial assets and liabilities is set out below: 
 

Kula Gold Limited 
 
- 47 - 
Specific financial risk exposures and management 
 
The main risks the Group are exposed to through its financial instruments are credit risk, liquidity risk and 
market risk consisting of interest rate, equity and commodity price risk. 
 
The Board of directors has overall responsibility for the establishment and oversight of the risk management 
framework. The Board adopts practices designed to identify significant areas of business risk and to effectively 
manage those risks in accordance with the Group’s risk profile. This includes assessing, monitoring and 
managing risks for the Group and setting appropriate risk limits and controls. The Group is not of a size nor is 
its affairs of such complexity to justify the establishment of a formal system for risk management and 
associated controls. Instead, the Board approves all expenditure, is intimately acquainted with all operations 
and discuss all relevant issues at the Board meetings. The operational and other compliance risk management 
have also been assessed and found to be operating efficiently and effectively.  
 
Credit risk 
 
Exposure to credit risk relating to financial assets arises from the potential non-performance by counterparties 
of contract obligations that could lead to a financial loss to the Group. 
 
The Group does not have any material credit risk exposure to any single receivable or group of receivables 
under financial instruments entered into by the Group.  
 
The Group’s cash is held in an Australian financial institution which is considered to have high creditability. The 
Group believes that it has no major credit risk. 
 
Liquidity risk 
 
Liquidity risk arises from the possibility that the Group might encounter difficulty in settling its debts or 
otherwise meeting its obligations related to financial liabilities. 
 
The Group has no income from operations and relies on equity fund raising to support its exploration programs. 
The Group manages liquidity risk by continuously monitoring forecasts and actual cash flows and ensuring 
sufficient cash and marketable securities are available to meet the current and future commitments of the 
Group. 
 
Liquidity risk is the risk that the Group will not be able to meet its financial obligations as they fall due. The 
Group’s approach to managing liquidity is to ensure, as far as possible, that it will always have sufficient liquidity 
to meet its liabilities when due, under both normal and stressed conditions, without incurring unacceptable 
losses or risking damage to the Group’s reputation. 
 
Typically, the Group ensures that it has sufficient cash to meet expected operational expenses for a period of 
60 days, including the servicing of financial obligations; this excludes the potential impact of extreme 
circumstances that cannot reasonably be predicted, such as natural disasters. 
 
The financial liabilities of the Group are confined to trade and other payables as disclosed in the consolidated 
statement of financial position. All trade and other payables are non-interest bearing and due within 30 days 
of the reporting date. 
 
21. Financial risk management (continued) 

Kula Gold Limited 
 
- 48 - 
 
The following are the contractual maturities of the financial liabilities of the Group: 
 
21. Financial risk management (continued) 
 
Within 1 Year 
Greater Than 1 Year 
Total 
 
2024 
$ 
2023 
$ 
2024  
$ 
2023 
$ 
2024 
$ 
2023 
$ 
Financial liabilities due for payment 
 
 
 
 
 
 
Trade and other payables 
(332,892) 
(396,060) 
- 
- 
(332,892) 
(396,060) 
Total contractual outflows 
(332,892) 
(396,060) 
- 
- 
(332,892) 
(396,060) 
Financial assets 
 
 
 
 
 
 
Cash and cash equivalents 
39,314 
393,378 
- 
- 
39,314 
393,378 
Total anticipated inflows 
39,314 
393,378 
- 
- 
39,314 
393,378 
Net outflows on financial instruments 
(293,578) 
(2,682) 
- 
- 
(293,578) 
(2,682) 
It is not expected that the cash flows included in the maturity analysis could occur significantly earlier or at 
significantly different amounts. 
 
Market risk 
 
Market risk is the risk that changes in market prices, such as interest rates and equity prices will affect the 
Group’s income or the value of its holdings of financial instruments. The objective of market risk 
management is to manage and control market risk exposures within acceptable parameters, while 
optimising the return. 
 
Interest rate risk 
 
Exposure to interest rate risk arises on financial assets and financial liabilities recognised at the end of the 
reporting period whereby a future change in interest rates will affect future cash flows or the fair value of 
fixed rate financial instruments. The Group is also exposed to earnings volatility on floating rate 
instruments. 
 
Cash and cash equivalents bear interest at floating rates based on the bank prime rate, and as such, are 
subject to interest rate cash flow risk resulting from market fluctuations in interest rates. The Group has 
cash balances in bank accounts and short-term deposits. Due to the short-term nature of these financial 
instruments, the Group believes that risks related to interest rates are not significant to the Group at this 
time. 
 
Price risk 
 
Price risk relates to the risk that the fair value or future cash flows of a financial instrument will fluctuate 
because of changes in market prices. The Group does not presently hold material amounts subject to price 
risk. As such the Board considers price risk as a low risk to the Group. 
 
Commodity Price risk 
 
The ability of the Group to develop its properties and the future profitability of the Group is directly related 
to the market price of certain minerals. A sustained, significant decline in either the prices of the minerals, 
the Group’s issued equities or investor sentiment can have a negative impact on the Group’s ability to raise 
additional capital. 
 
Once in production the Group initially expects to have an exposure to commodity price risk associated with 
the production and sale of gold, kaolin and lithium, However, the Group is still in the exploration stage. 
 

Kula Gold Limited 
 
- 49 - 
 
Net fair values 
 
Fair value estimation 
 
The fair values of financial assets and financial liabilities are presented in the table in note 21 and can be 
compared to their carried values as presented in the consolidated statement of financial position. Fair values
are those amounts at which an asset could be exchanged, or a liability settled, between knowledgeable,
willing parties in an arm’s length transaction. 
 
Financial instruments whose carrying value is equivalent to fair value due to their mature include: 
 
 
Cash and cash equivalents; 
 
Receivables and other assets; and 
 
Trade and other payables. 
 
The methods and assumptions used in determining the fair values of financial instruments are disclosed in
the accounting policy notes specific to the asset or liability. 
 
 
 
Note 
2024 
2023 
 
 
$ 
$ 
 
Cash and cash equivalents 
8 
39,314 
393,378 
 
Trade and other payables 
13 
(332,892) 
(396,060) 
 
 
(293,578) 
(2,682) 
 
22. Capital management 
 
The directors’ objectives when managing capital is to raise sufficient funds in order to maintain and 
execute the objectives identified in each mineral property project in the Group’s exploration plan. There 
is no quantitative return of capital criteria set out for management, but instead the Group relies on the 
expertise of management to further develop and maintain its activities. The Group monitors its capital 
through monthly Board reporting including management accounts and forecasts combined with 
appropriate external financial, corporate and legal advice when required. The Group is not subject to any 
externally imposed capital requirements. 
 
The Group considers its capital to be equity which comprises fully paid ordinary shares, share-based 
payment reserve, consolidation reserve and accumulated losses, which at 31 December 2024 amounted 
to $1,030,575 (2023: $1,610,930). 
 
The mineral properties in which the Group currently has an interest are in the exploration stage, as such 
the Group is dependent on external financing to fund its activities. In order to carry out the planned 
exploration and pay for administrative costs, the Group will spend its existing working capital and raise 
additional amounts as required. 
 
There were no changes in the Group’s approach to capital management during the current or previous 
financial years. 
 
The working capital position of the Group were as follows: 
 
 
2024 
2023 
 
$ 
$ 
 
Remuneration of the auditor of Kula Gold Limited for: 
 
 
 
Auditing or reviewing the financial reports 
 
 
 
Elderton Audit Pty Ltd 
21,462 
26,775 
 
21,462 
22,775 
21. Financial risk management (continued) 
23. Auditor’s remuneration 

Kula Gold Limited 
- 50 - 
 
24. Contingent assets/liabilities 
 
There were no contingent assets or liabilities as at 31 December 2024 or 31 December 2023.  
 
25. Commitments 
 
Exploration expenditure  
 
The minimum annual exploration and evaluation expenditure to keep the Group’s tenements in good 
standing is $584,340 (2023: $581,500). 
 
26. Controlled entities 
 
 
Country of 
Incorporation 
Equity Holding 
 
 
2024 
2023 
Boomerang Kaolin Pty Ltd1 
Australia 
100% 
100% 
Kula Resources Limited2 
Malawi 
100% 
- 
 
1 Incorporated on 16 May 2022 to identify costs associated with the Boomerang Kaolin Project on 
tenement E77/2621. 
2 Incorporated on 1 July 2024 to hold exploration licences in Malawi. 
 
Both entities are wholly owned subsidiaries of Kula Gold Limited and the investment is held by that entity. 
 
27.  Joint ventures 
 
Mt Palmer Gold Mine – 51% (earning to 80%) 
During the financial year, the Company acquired 51% and earning to 80% of the historical Mt Palmer Gold 
Mine (tenements M77/0406, E77/2210, E77/2423 & E77/2668) from Aurumin Limited (‘Aurumin’) (ASX: 
AUN) via the issue of 25,000,000 fully paid ordinary shares at the deemed issue price of $0.01, following 
shareholder approval. 
 
The Company can earn-in a further 29% by incurring exploration expenditure of $1,000,000 for a period of 
up to 3 years. Aurumin has, in the event the Company does not earn the additional 29% interest, the right 
to purchase back 2% interest for $1. Thereafter the Company and Aurumin contribute on a pro-rated basis 
or Aurumin dilutes. Aurumin’s equity position converts to a 1% net smelter royalty if diluted to less than 
10%. 
 
As at 31 December 2024, the Company has spent $778,605 on the Mt Palmer Gold Mine tenements. 
 
Kirup Project 
The Company has a Joint Venture with Sentinel Exploration Limited holding a 70% interest in E70/5452. 
(Refer note 19). 
 
Rankin Dome Project 
The Company had a Joint Venture with Australian Critical Minerals Limited (‘ACM’) (ASX: ACM) in respect 
of the Company’s non-core Rankin Dome Project comprising of three tenements being E77/2709, 
E77/2753 and E77/2768 (‘Rankin Dome Project’). 
 
ACM has formally withdrawn its interest in exploration licence E77/2768.  
 
The Company has relinquished the Rankin Dome Project. 

Kula Gold Limited 
- 51 - 
 
 
 
28. Subsequent events 
 
 
On 6 January 2025, the Company announced a non-renounceable pro-rata entitlement offer to 
eligible shareholders on the basis on one fully paid ordinary share for every two fully paid 
ordinary shares held at an issue price of $0.005 to raise approximately $1,600,000 before costs. 
 
 
On 22 January 2025, the Company announced that it has formed a joint venture that has applied 
for an exploration licence in Malawi, known as the Wozi Niobium Project, and that the Malawi 
Government’s Mining and Minerals Regulatory Authority has recommended the grant, subject 
to completion of an environmental study. 
 
Kula 75% and Manager, African Rare Metals Pty Ltd holds a 25% free carried interest for 
US$100,000 then may contribute or dilute to a 10% free carried interest until a decision to mine. 
The JV agreement includes a 2% Net Smelter Royalty, which the Company can acquire for 
A$10,000,000 at anytime and such right is transferrable.  
 
 
On 31 January 2025, the Company issued 66,441,764 fully paid ordinary shares at an issue price 
of $0.005, raising $332,209 pursuant to the non-renounceable pro-rata entitlement offer 
announced on 6 January 2025. The Company has 3 months from the closing date to place any 
shortfall from the offer. 
 
 
On 27 February 2025, the Company issued 211,600,000 fully paid ordinary shares at an issue 
price of $0.005, raising an additional $1,058,000 before costs under the shortall of the non-
renounceable pro-rata entitlement offer on 6 January 2025. The Company will pay a capital 
raising fee of 6% plus GST together with 20,000,000 unlisted options exercisable at $0.015 on or 
before 31 May 2027 to the Lead Manager of the shortfall offer. 
 
 
On 27 February 2025, the Company issued 27,500,000 unlisted options exercisable at $0.015 on 
or before 31 May 2027. 20,000,000 options were issued to the lead manager of the shortfall 
offer and 7,500,000 were issued under the Employee Incentive Option Plan. 
 
Other than the above, there has not been any matter or circumstance occurring subsequent to the end 
of the financial year that has significantly affected, or may significantly affect, the operations of the 
Group, the results of those operations, or the state of affairs of the Group in future financial years. 
 
 
 

Kula Gold Limited 
- 52 - 
 
 
Consolidated entity disclosure statement 
 
Basis of preparation 
 
The consolidated entity disclosure statement has been prepared in accordance with subsection 295(3A)(a) of the 
Corporations Act 2001 (Cth). The entities listed in the statement are Kula Gold Limited and all the entities it controls 
in accordance with AASB 10 Consolidated Financial Statements. 
 
The percentage of share capital disclosed for body corporates included in the statement represents the economic 
interest consolidated in the consolidated financial statements. In developing the disclosures in the statement, the 
directors have relied on the advice provided by management and the Company’s taxation adviser. 
 
The Group’s consolidated entity disclosure statement as at 31 December 2024 is set out below. 
 
As at 31 December 2024 
Body Corporates 
Entity name 
Entity type 
Place incorporated 
% of share capital 
Tax residency 
Kula Gold Limited 
Body Corporate 
Australia 
N/A 
Australia 
Boomerang Kaolin Pty Ltd 
Body Corporate 
Australia 
100% 
Australia 
Kula Resources Limited 
Body Corporate 
Malawi 
100% 
Malawi 
 
 
 
 
 

Kula Gold Limited 
- 53 - 
 
Additional Information for Listed Public Companies 
 
The following additional information as at 25 March 2025 is required by the Australian Securities Exchange in respect of listed 
public companies. 
1 
Capital 
a. 
 Fully paid ordinary shares 
921,253,685 fully paid ordinary shares held by 1,178 shareholders.  
b. 
Listed options 
The Company has no listed options on issue. 
c. 
Unlisted options  
8,350,000 unlisted options exercisable at $0.06 expiring 1 July 2026 held by 9 optionholders.  
575,000 unlisted options exercisable at $0.085 expiring 1 August 2025 held by 3 optionholders. 
6,000,000 unlisted options exercisable at $0.08 expiring 7 November 2025 held by 2 optionholders. 
5,000,000 unlisted options exercisable at $0.02 expiring 1 July 2026 held by 1 optionholder. 
5,000,000 unlisted options exercisable at $0.05 expiring 1 July 2027 held by 1 optionholder. 
37,500,000 unlisted options exercisable at $0.015 expiring 31 May 2027 held by 2 optionholders. 
7,500,000 unlisted options exercisable at $0.025 expiring 30 June 2027 held by 11 optionholders. 
d. 
Performance Shares 
The Company has no performance shares on issue. 
e. 
Voting Rights 
The voting rights attached to each class of equity security are as follows: 
 
Fully paid ordinary shares: Each fully paid ordinary share is entitled to one vote. 
 
Listed, unlisted options and performance shares: Optionholders of listed or unlisted options and holders of 
performance shares are not entitled to vote by virtue of holding an option or performance share.  
f. 
Substantial Shareholders as at 25 March 2025 
 
Name 
Number of Fully Paid 
Ordinary Shares Held 
% Held of Issued 
Ordinary Capital 
 
Ice Cold Investments Pty Ltd 
68,000,000 
7.38% 
 
Merchant Holdings Pty Ltd 
54,037,321 
5.87% 
g. 
Distribution of Shareholders as at 25 March 2025 
 
Category (size of holding) 
Total Holders 
Number 
Ordinary 
% Held of Issued 
Ordinary Capital  
 
1 – 1,000 
55 
12,187 
0.00 
 
1,001 – 5,000 
36 
104,558 
0.01 
 
5,001 – 10,000 
42 
345,819 
0.04 
 
10,001 – 100,000 
530 
25,647,367 
2.78 
 
100,001 – and over 
515 
895,143,754 
97.17 
 
 
1,178 
921,253,685 
100.00 
h. 
Unmarketable Parcels as at 25 March 2025 
562 fully paid ordinary shareholders holding less than a marketable parcel of shares. 
i. 
On-Market Buy-Back 
There is no current on-market buy-back. 

Kula Gold Limited 
    
- 54 - 
 
j. 
Restricted Securities 
5,000,000 unlisted options exercisable at $0.02 expiring 1 July 2026. 
5,000,000 unlisted options execrable at $0.05 expiring 1 July 2027. 
3,750,000 unlisted options exercisable at $0.015 expiring 31 May 2027. 
3,750,000 unlisted options exercisable at $0.025 expiring 30 June 2027. 
k. 
20 Largest Shareholders — Ordinary Shares as at as at 25 March 2025 
 
 Rank Name 
Number of Ordinary 
Fully Paid Shares Held 
% Held of Issued 
Ordinary Capital 
 1. 
 MERCHANT HOLDINGS PTY LTD 
49,537,321 
5.38% 
 2. 
 SB & ET HOLDINGS PTY LTD 
45,000,000 
4.88% 
 3. 
 CURIOUS COMMODITIES PTY LTD 
40,000,000 
4.34% 
 4. 
 ICE COLD INVESTMENTS PTY LTD  
38,000,000 
4.12% 
 5. 
 ICE COLD INVESTMENTS PTY LTD  
30,000,000 
3.26% 
 6. 
 HENGGELER SUPER PTY LTD  
28,408,500 
3.08% 
 7. 
 AURUMIN LIMITED 
25,000,000 
2.71% 
 8. 
 ACUITY CAPITAL INVESTMENT MANAGEMENT PTY LTD  
24,000,000 
2.61% 
 9. 
 GREATSIDE HOLDINGS PTY LTD  
22,750,000 
2.47% 
 10.  MR JAY HUGHES & MRS LINDA HUGHES  
21,500,000 
2.33% 
 11.  BNP PARIBAS NOMINEES PTY LTD  
21,300,000 
2.31% 
 12.  HONGKONG NOBLEFULL LIMITED 
21,000,000 
2.28% 
 13.  PINDAN INVESTMENTS PTY LTD  
20,000,000 
2.17% 
 
 G & S MART PTY LTD  
20,000,000 
2.17% 
 14.  MR NICHOLAS MCDONALD 
15,000,000 
1.63% 
 15.  SENTINEL EXPLORATION LTD 
12,000,000 
1.30% 
 16.  CITICORP NOMINEES PTY LIMITED 
10,210,798 
1.11% 
 17.  AURALANDIA PTY LTD 
10,000,000 
1.09% 
 
 G & S MART PTY LTD  
10,000,000 
1.09% 
 
 MR KIM ALEXANDER STEPHEN & MRS CAROLYN MAY STEPHEN 
10,000,000 
1.09% 
 
 MR LUKE ANTHONY MARSHALL 
10,000,000 
1.09% 
 18.  KALARRA HOLDINGS PTY LTD 
7,875,000 
0.85% 
 19.  SOUTHERN MOTORS PTY LTD 
7,000,000 
0.76% 
 
 RUNNING WATER LIMITED 
7,000,000 
0.76% 
 20.  MRS TERESA DI PASQUALE 
6,100,000 
0.66% 
 
 
TOTAL 
511,681,619 
55.54% 
2 
Principal registered office 
As disclosed in the corporate information of this Annual Report. 
3 
Registers of securities  
As disclosed in the corporate information of this Annual Report. 
4 
Stock exchange listing 
Quotation has been granted for the fully paid ordinary shares of the Company on all Member Exchanges of the Australian Securities Exchange Limited, 
as disclosed in the corporate information of this Annual Report. 
5 
Use of funds 
The Group has used its funds in accordance with its business objectives. 

Kula Gold Limited 
    
- 55 - 
 
Mineral Resources and Ore Reserves Statement 
 
The information in this Annual Report relating to estimates of Mineral Resources and Ore Reserves has been 
extracted from the following news release technical reports: 
 
News release date 
News release title 
Description 
20 July 2022 
Boomerang 
Kaolin 
Project 
– 
Maiden JORC Resource 93.3Mt 
Resource estimate for Boomerang 
Kaolin Deposit with relevant JORC 
Code (2012) Table 1. 
 
The news release referenced in the table above is available on the Company’s website. The Company confirms that 
it is not aware of any new information or data that materially affects the information included in the most recent 
market announcement for the Boomerang Kaolin Deposit and, in the case of Mineral Resources and Ore Reserves, 
that all material assumptions and technical parameters underpinning the estimates in the relevant market 
announcement continues to apply and has not materially changed. The Company confirms that the form and 
context in which the Competent Person’s findings are presented has not materially modified from the original news 
release. 
 
Boomerang Kaolinized Granite Mineral Resource – July 2022 – (JORC Code 2012) 
 
Classified Kaolinized Granite Mineral Resource Material – Resource Summary 
Class 
Zone 
Volume (Mm3) 
Tonnes (Mt) 
Material 
Indicated 
1 
8.0 
15.2 
Kaolinized Granite 
Inferred 
2 
41.1  
78.1 
Kaolinized Granite 
Total 
1+2 
49.1 
93.3 
Kaolinized Granite 
* Regression analysis of available brightness and Al2O3 analysis data shows material with a brightness of 81.1 has 
a -45 µm Al2O3 grade of 36.7% Al2O3. 
 
The mineral resource table above following mineral processing test work derives a Kaolin Product of minus 45µm 
component and using a 30% Al2O3 lower cut-off to yield 7.2Mt of Kaolin Product in the Indicated Category and 
36.4Mt of Kaolin Product in the Inferred Category. A summary of the minus 45µm material with associated selected 
element concentrations is shown in the table below. 
 
Boomerang Mineral Resource Within -45µm Material – July 2022 – (JORC Code 2012) 
 
Resource Summary - Classified -45µm Material Reporting Above 30% Al2O3 Lower Cut-Off. 
Class 
Zone 
Volume 
(Mm3) 
Tonnes 
(Mt) 
PSD (%) 
-45µm 
Al2O3 
(%) 
Fe2O3 
(%) 
TiO2 
(%) 
Indicated 
1 
3.8 
7.2 
49.39 
35.09 
0.87 
0.56 
Inferred 
2 
19.1 
36.4 
48.52 
35.56 
0.86 
0.41 
Total 
1+2 
22.9 
43.6 
48.67 
35.48 
0.86 
0.43 
 
 
 
 
 
 
 
 
 
Competent Person Statement 
The information in this annual report that relates to geology, exploration and/or visual estimates is based on, and fairly represents, information 
and supporting documentation compiled by Mr. Ric Dawson, a Competent Person who is a member of the Australian Institute of Mining and 
Metallurgy.  Mr. Dawson is a Geology and Exploration Consultant who has been engaged by Kula Gold Limited and is a related party of the 
Company.  Mr. Dawson has sufficient experience, which is relevant to the style of mineralisation, geology and type of deposit under 
consideration and to the activity being undertaken to qualify as a competent person under the 2012 edition of the Australasian Code for 
Reporting Exploration Results, Mineral Resources and Ore Reserves (the 2012 JORC Code).  This report is issued with the prior written consent 
of Mr. Dawson as to the form and context in which any exploration results, visual estimates or supporting documentation is presented in the 
annual report. 

Kula Gold Limited 
 
- 56 - 
Interest in mining tenements (as at date of this report) 
 
Tenement No. 
Project 
Interest 
Grant Date 
E77/2756 
Westonia 
100% 
8/10/2021 
E77/2766 
Westonia 
100% 
8/10/2021 
E77/3234 
Westonia 
100% 
1/10/2024 
E77/3237 
Westonia 
100% 
2/10/2024 
E77/2621 
Marvel Loch 
100% 
3/09/2020 
E77/22101 
Marvel Loch 
51% 
17/11/2014 
E77/24231 
Marvel Loch 
51% 
26/07/2017 
E77/26681 
Marvel Loch 
51% 
7/09/2023 
M77/04061 
Marvel Loch 
51% 
30/03/1990 
P77/4527 
Marvel Loch 
100% 
25/03/2020 
E77/2806 
Southern Cross 
100% 
19/07/2022 
E70/5599 
Brunswick 
100% 
26/07/2021 
E70/5645 
Brunswick 
100% 
6/05/2021 
E70/5660 
Brunswick 
100% 
28/04/2021 
E70/54522 
Kirup 
70% 
4/01/2021 
E70/6603 
Kirup 
100% 
21/03/2024 
E70/6626 
Kirup 
100% 
24/05/2024 
E28/3029 
Lake Rebecca 
100% 
10/03/2021 
1 The Company has a JV Agreement with Aurumin Limited (ASX:AUN), earning to 80%. (Refer ASX 
Announcement, Mt Palmer Gold Mine Acquisition & Placement, dated 31 May 2024).  
2  The Company has a JV Agreement with Sentinel Exploration Limited in respect of tenement E70/5452. 
(Refer ASX Announcement Kula To Acquire 70% In Key Lithium Tenement – Kirup Project, dated 28 
November 2024).