FY2024 Annual Report · Paladin Energy
Sign in to download
Loading PDF…
Annual Report 2024
RESOURCING A GLOBAL 
CARBON-FREE FUTURE


Contents
Chair’s Letter	
2
Insights from the CEO	
4
Year at a Glance	
10
Operating and Financial Review	
12
Ore Reserves and Mineral Resources	
28
Environmental, Social and Governance	
34
Corporate Governance Statement 	
42
Directors’ Report	
44
Remuneration Report	
52
Auditor’s Independence Declaration	
82
Contents of the Financial Report	
85
Consolidated Income Statement	
86
Consolidated Statement of Comprehensive Income	
87
Consolidated Statement of Financial Position	
88
Consolidated Statement of Changes in Equity	
89
Consolidated Statement of Cash Flows	
90
Notes to the Consolidated Financial Statements	
91 
Consolidated Entity Disclosure Statement	
134
Directors’ Declaration	
135
Independent Audit Report	
136
Additional Information	
142
Corporate Directory	
145
PALADIN ENERGY ANNUAL REPORT 2024
1

I am pleased to present Paladin Energy’s 2024 Annual 
Report. It has been a remarkable year for our Company 
with the return of the Langer Heinrich Mine (LHM) to 
production in March 2024. Achievement of commercial 
production and the first shipment from the LHM were 
the culmination of a substantial program of work and 
I would like to thank all our staff and contractors for 
their hard work and dedication in returning this globally 
significant uranium mine to production.
Nuclear energy remains one of the most cost effective 
and lowest carbon emitting forms of energy generation 
and the only viable long-term source of low carbon 
emission baseload power. While renewable power 
sources such as wind and solar are gaining market 
share in the global energy mix, nuclear power’s low 
emission intensity and higher capacity factor will ensure 
that nuclear power, and therefore uranium, remain key 
components of carbon-free base-load power production, 
as the world moves towards decarbonisation. During the 
COP28 Conference more than 20 countries from four 
continents launched the Declaration to Triple Nuclear 
Energy1. The Declaration recognises the key role of 
nuclear energy in achieving global net-zero greenhouse 
gas emissions by 2050 and keeping the 1.5-degree goal 
within reach. Nuclear energy has also received bipartisan 
political support in the United States of America and 
government support across Europe where it has been 
recognised as a green source of energy by the EU. 
With limited investment in new uranium mines, there is 
a growing supply deficit that is anticipated to grow to 
over 50Mlb per annum over the next decade2. Diversity 
of supply is also becoming increasingly important with 
recent geopolitical activities, including the recent US ban 
on Russian supplies. The LHM in Namibia is delivering 
production into an increasingly supportive demand and 
price environment and Paladin stands proud to be part of 
a sustainable future.
During the past year, Paladin achieved significant 
milestones including completion of the LHM Restart 
Project on time and within cost forecast, exceptional 
project delivery with over 2.5 million project hours 
with no serious injury or environment incident, 
commencement of production at the LHM, inventory 
build up ahead of our first customer shipment and the 
provision of capital flexibility to our balance sheet via  
a US$150M Syndicated Debt Facility. 
Paladin was pleased to achieve the successful 
commencement of commercial production, and to 
exceed the safety, growth and corporate strategic 
goals set for FY2024, and delivered strong share price 
performance with an annual Total Shareholder Return 
of +71%.
Paladin remains fully committed to a globally 
accredited Environmental, Social and Governance 
(ESG) framework that represents best practice, sets 
standards of organisational behaviour and holds 
us firmly accountable. Our activities continue to be 
underpinned by our commitment to sustainability which 
is vitally important to us, and we work hard to ensure 
that both our personal and our organisational values 
and actions are of the highest standard.
I would like to thank our shareholders for continuing to 
offer their trust and support as we returned Paladin  
to production.
With the restart of production, a strong balance sheet, 
supportive uranium fundamentals and identifiable growth 
opportunities, Paladin is exceptionally well positioned to 
continue to grow value for all of our stakeholders.
Together, we look forward to forging a positive and 
sustainable future for our Company and for the planet.
Yours faithfully
Cliff Lawrenson
Chair
Chair’s Letter
Cliff Lawrenson
Dear Shareholders, 
1	 https://www.energy.gov/articles/cop28-countries-launch-declaration-triple-nuclear-energy-capacity-2050-recognizing-key
2	 TradeTech Uranium Market Study 2024: Issue 2 – Summary Supply & Demand Data – FAM 2
PALADIN ENERGY ANNUAL REPORT 2024
2

Pathway to becoming  
a world-class, independent 
uranium producer
Leading the way towards 
the future with purpose
PALADIN ENERGY ANNUAL REPORT 2024
3

Insights from the CEO
Ian Purdy
Dear Shareholders, 
The return of the Langer Heinrich Mine (LHM) to 
production was a major milestone on Paladin’s pathway 
to becoming a globally significant independent uranium 
producer. As we progressed the restart of the LHM 
we simultaneously and deliberately executed a range 
of strategies aimed at transforming our Company to 
ensure that we were in a formidable position to take 
advantage of both our asset base and the strong 
structural demand outlook for uranium. As we continue 
to execute on our strategies for value creation, we do 
so from a position of strength that includes: 
•	 Production ramp up and sales at the LHM
•	 Financial flexibility with US$48.9M in cash and 
US$80M in undrawn debt facilities at 30 June 2024
•	 Relationships with the largest global nuclear energy 
counterparties and a world-class contract book with 
significant exposure to spot prices
•	 Growth projects in the three best western world 
uranium mining jurisdictions
•	 Operational, project and leadership capability to 
deliver consistent performance.
During FY2024, Paladin achieved an outstanding 
performance in safety, completed the Restart Project, 
delivered first production at the LHM, and achieved 
the Company's strategic objectives. The Langer 
Heinrich operations team have done an exceptional 
job in delivering production and our proven operational 
capability underpins our operational ramp up in FY2025.
The Company is well positioned as a leading global 
uranium producer and is contributing to the transition 
towards a decarbonised future.
Decarbonisation driving a structural shift in the 
uranium market 
Nuclear energy will continue to play an important role in 
the transition to a low carbon economy as the second 
largest source of global clean energy with almost zero 
carbon emissions. Importantly uranium fuel is one of 
the most concentrated energy forms with one kilogram 
of enriched uranium-235 releasing about 24 million 
kilowatt hours (kWh) of energy through nuclear fission, 
which is equivalent to burning approximately 3,000 tons 
of coal1. The energy dense nature of uranium results in 
an exceptionally low environmental footprint.
Increasingly, governments around the world are 
recognising the importance of uranium’s base load 
power capabilities to power grids that are becoming 
increasingly supplied by intermittent renewable power. 
In the US, there is bipartisan political support for nuclear 
energy through the Inflation Reduction Act. In Europe, 
nuclear has been recognised as a green source of 
energy in the EU. Most recently, more than 20 countries 
from four different continents launched a joint declaration 
to triple nuclear energy by 2050, recognising the key 
role of nuclear energy in achieving net-zero greenhouse 
gas emissions by mid-century. Globally there are over 
60 new uranium reactors under construction, and in 
China the commitment to nuclear energy continues to 
strengthen with nuclear energy demand expected to 
grow from 15% to 33% of global requirements by 20402.
The growing demand for uranium is being exacerbated 
by supply shortage due to underinvestment. New mine 
development required to meet future demand has 
lagged. Secondary supplies are down 38% on 2021 
levels3 and geopolitical issues such as the US ban on 
Russian supplies are all intensifying the structural deficit 
in the uranium market which has led to a strong price 
recovery for uranium both in the term and spot markets.
With the LHM returning to production in a structurally 
strong uranium pricing environment, Paladin is well 
positioned to deliver meaningful financial performance 
and shareholder returns.
1	 European Nuclear Society, Fuel Comparison: https://www.euronuclear.org/glossary/fuel-comparison/
2	 TradeTech Uranium Market Study 2024, Issue 2
3	 UxC Market Outlook, Q2 2024
PALADIN ENERGY ANNUAL REPORT 2024
4

17 year mine life, 
producing 77Mlb  
U3O8
World-class 
operations
517,597lb
U3O8 produced to  
30 June 2024
Production nameplate 
capacity expected by 
the end of CY2025
17 years
6Mlb
Global Exploration and 
Development Assets
PALADIN ENERGY ANNUAL REPORT 2024
5

Insights from the CEO
World-class offtake contract book exposed to 
spot pricing
The return of the LHM to production is supported by 
a geographically diverse world-class offtake contract 
book, with offtake agreements secured with top-tier 
counterparties in the United States, Europe and Asia. 
These organisations represent the leading offtake 
parties in the global uranium industry.
Our contract book with these leading counterparties 
supports our operations whilst retaining exposure to the 
spot price, ensuring we have leverage to strengthening 
uranium pricing fundamentals.
We will continue to layer our contract book to ensure 
we provide the right balance of risk protection and 
pricing upside to our shareholders.
Langer Heinrich Mine returned to production 
It was truly a momentous event to see the first drums 
of uranium produced from the Langer Heinrich Mine 
in March 2024. The return to commercial production 
was the culmination of an extensive work package 
that commenced in July 2022 and focused on the 
repair, refurbishment and debottlenecking of the 
existing LHM plant which was placed into Care and 
Maintenance in 2018.
The key Repair & Refurbishment work streams delivered 
to return the LHM to production include:
•	 Civil/structural improvement works (concrete, steel)
•	 Mechanical refurbishment works (pumps, pulleys, 
conveyors, ancillaries)
•	 Piping & valve refurbishment and replacement works 
(pipes, valves, racks, mounts)
•	 Electrical improvement works (uninterrupted power 
supply units, lighting, plant electricals)
•	 Control & Instrumentation refurbishment  
works (repairs, replacement, calibration and  
recommissioning of all instruments).
Furthermore, debottlenecking upgrades were delivered 
to derisk production and increase throughput capacity 
and operational availability of the plant whilst improving 
environmental and sustainability aspects of the plant 
and operations.
The return of the LHM to production was completed on 
time and within cost forecast. Importantly, it was done 
so with over 2.5 million project hours worked with no 
serious injury or environmental incident. The project  
had a peak workforce of 1,200.  
The ongoing operations of the LHM is in the hands of a 
full time local workforce of over 300, supported by 165 
experienced mining contractors from Trollope Mining,  
a leading African mining contractor.
The first customer shipment from the LHM departed 
Walvis Bay, Namibia in July 2024, and shipments will 
continue under the Company’s long-term offtake 
agreements with top-tier industry counterparties.
With a robust operational plan, strong performance since 
the restart and the presence of a highly experienced 
team on the ground, we are confident in the ability of the 
LHM to generate significant value for our shareholders.
Strong Growth Pathway
Whilst our focus remains on executing the ramp up of 
operations at the LHM, Paladin has a portfolio of over 
440Mlb of high grade mineral resource in key global 
uranium jurisdictions. These globally significant high-
grade exploration assets provide a strong future growth 
pathway for Paladin. 
At Langer Heinrich our exploration activities are focused 
on reserve and resource expansion. The strong uranium 
price delivers the potential to lower the cutoff grade 
and optimise the mine plan to increase available 
tonnes for processing. Furthermore, workstreams are 
underway to determine key areas for exploration and 
infill drilling in the mining leases adjacent to our current 
mine plan. In the medium term, we will consider plant 
capacity expansions, ore sorting technologies and heap 
leaching opportunities to maximise the value from this 
world-class asset.
Paladin increased our ownership of the Michelin Project 
in Labrador, Canada from 75% to 100% in October 
2023, where we are commencing a Pre-Feasibility 
Study (PFS) to build upon the substantial exploration 
activity completed at the asset. The Pre-Feasibility 
work will update previous work conducted at Michelin 
in 2009 which highlighted the potential for a 6Mlb per 
annum operation. The study will evaluate alternate 
development options with the aim of reducing capital 
expenditure as well as progressing Environmental 
Impact Assessment work. With only 15% of the 
tenement area having been tested by drilling there 
is substantial upside potential at Michelin. During 
the year Paladin was granted new mineral licences 
for prospective new ground adjoining Michelin, with 
exclusive rights to explore the tenements. Paladin has 
a significant Canadian presence and is focused on 
organic and inorganic opportunities to complement the 
potential of our existing assets in the region.
PALADIN ENERGY ANNUAL REPORT 2024
6

Resourcing a global, 
carbon-free future
PALADIN ENERGY ANNUAL REPORT 2024
7

PALADIN ENERGY ANNUAL REPORT 2024
8

Our People
From a people perspective, we continue to put the 
health, safety and wellbeing of our workforce and all 
stakeholders at the forefront, with a positive culture of 
safety that underpins all of our decisions and actions. 
Paladin has a policy of prioritising local employment, 
and the LHM Restart Project provided local and regional 
employment opportunities wherever possible. The LHM 
continues to provide many jobs and opportunities to 
Namibian nationals in operations, with 98% local LHM 
employees. Additionally, 99% of the LHM employees 
and mining contractors reside in local communities, 
contributing significantly to the economic wellbeing of 
the local population and the overall Namibian economy.
We have built an exceptional team at the LHM and 
Paladin and I am proud to lead such a talented and 
dedicated group of people. I would like to take this 
opportunity to thank all of our staff and contractors  
for their tireless and safe work over FY2024.
Outlook
Paladin has a clear strategy for sustainable value 
creation. We have returned the LHM to production 
and commenced shipping to our leading global 
counterparties and are now focused on ramp up 
activities at the mine to reach nameplate capacity. 
We will deliver development and exploration potential 
from our global portfolio of exploration and growth 
opportunities. And finally, we will embed sustainable 
returns and establish a capital management framework 
to drive long-term value to shareholders via returns on 
capital, organic growth and M&A activity.  
I would like to thank our Board of Directors for their 
ongoing commitment and support. 
Finally, I would like to extend my sincere thanks to you, 
our shareholders, for showing continued support for 
our Company. With world-class assets, a strong and 
flexible financial position and exposure to the structural 
growth in nuclear energy, Paladin is well placed to 
deliver sustainable returns to our shareholders and 
actively contribute to the decarbonisation of global 
electricity generation.
Yours faithfully
Ian Purdy
Chief Executive Officer
Insights from the CEO
Sustainability and Paladin
At Paladin, ESG is core to our business, and we want 
to be held accountable for what we do – not just for 
what we say. When our performance is measured, we 
expect that outcomes clearly reflect our behaviours.
We are guided by four key values that are at the core of 
everything we do:
•	 Integrity: We act with integrity and honesty in all  
we do and say
•	 Respect: We respect and value all people equally
•	 Courage: We meet all challenges and seize 
opportunities with courage
•	 Community: We invest in our communities to create 
lasting value
The structured implementation of the SASB, GRI and 
TCFD frameworks and compliance with the IFRS 
Sustainability Disclosure Standards will increase the 
level of detail reported as we ramp up production at the 
LHM, and will provide a more complete representation 
of Paladin’s performance to all key stakeholders. Paladin 
is also adopting, and continues to implement the IFC 
Sustainability Framework.
More detail on our Sustainability initiatives can  
be found in our 2023 Sustainability Report  
www.paladinenergy.com.au/sustainability.
100%  
DIRECTOR 
INDEPENDENCE
43% OF 
PALADIN’S 
BOARD ARE 
FEMALE
LHM LOCAL 
EMPLOYEES
100%
43%
98%
PALADIN ENERGY ANNUAL REPORT 2024
9

Paladin continues to promote safety and responsibility to all its employees and 
contractors. During the year, the Emergency Response Team received extensive 
emergency preparedness training including industrial firefighting, with basic fire 
extinguisher and hose reel training also provided to a large number of other employees.
The LHM Restart Project was completed on time and within cost forecast. The Restart 
Project focused on the Repairs & Refurbishment and debottlenecking of the existing 
plant. These upgrades were delivered to derisk production and increase throughput 
capacity and operational availability of the plant, whilst improving environmental and 
sustainability aspects of the plant and operations.
Paladin is fully committed to providing and maintaining a safe, secure and healthy 
work environment with the aim of zero harm from occupational injuries and illness 
in the workplace. In completing the LHM Restart Project, over 2.5 million hours 
were worked with no serious injuries or reportable environmental incidents.
Year at a Glance
PALADIN ENERGY ANNUAL REPORT 2024
10

Commercial production was achieved at the 
LHM on 30 March 2024. Production ramped up 
over the quarter, with 517,597lb U3O8 produced 
to 30 June 2024. Production will continue to 
ramp up during FY2025.
Paladin is committed to our local communities 
and is focused on having a positive impact and 
making meaningful contributions to their lives and 
livelihoods through community sponsorships and 
participation in local activities.
Paladin now holds a 100% interest in the Michelin advanced 
exploration project in Labrador, Canada (Michelin Project). 
The Company has been granted mineral licences for 
prospective new ground adjoining the Michelin Project, and 
has exclusive rights to explore these tenements.
Paladin has a geographically diverse world-class offtake 
contract book with leading global uranium industry 
counterparties in the US, Europe and Asia. The first customer 
shipment, containing 319,229lb U3O8 departed Walvis Bay, 
Namibia in July 2024 and a cash receipt of US$24.8M was 
received, representing a partial advance payment under the 
terms of the customer offtake agreement.
Paladin appointed Trollope Mining Namibia, a market 
leading mining contractor in Africa, for the stockpile 
reclaim phase of operations.
Production activities commenced during 
the year, with first ore feed into the LHM 
processing plant on 20 January 2024, 
following successful commissioning of the 
beneficiation circuit.
PALADIN ENERGY ANNUAL REPORT 2024
11

Operating and
Financial Review
Overview of Operations
Paladin Energy Ltd (ASX:PDN OTCQX:PALAF) 
(the Company or Paladin) is a globally 
significant independent uranium producer 
with a 75% ownership of the world-class long 
life Langer Heinrich Uranium Mine located 
in Namibia. Paladin also owns a portfolio of 
uranium exploration and development assets in 
Canada and Australia. 
The Company is committed to a best-practice 
Environmental, Social and Governance 
(ESG) framework that ensures responsible, 
accountable and transparent management of 
the uranium resources Paladin mines, both now 
and in the future.
Through the Langer Heinrich Mine (LHM), 
Paladin delivers reliable uranium supply to major 
nuclear utilities around the world, positioning 
itself as a meaningful contributor to global 
decarbonisation. 
The Company is incorporated under the laws 
of Australia with a primary share market listing 
on the Australian Securities Exchange (ASX) 
and the Namibian Stock Exchange (NSX). The 
Company also trades on the OTCQX market in 
the United States of America.
Operating and Financial Review
75
99%
68
LHM AVERAGE HEALTH, 
SAFETY & EMERGENCY 
RESPONSE TRAINING 
OF 75 HOURS PER 
EMPLOYEE IN FY2024
99% OF LHM 
EMPLOYEES AND 
MINING CONTRACTORS 
RESIDE LOCALLY
LHM AVERAGE HEALTH, 
SAFETY & EMERGENCY 
RESPONSE TRAINING 
OF 68 HOURS PER 
CONTRACTOR IN FY2024
PALADIN ENERGY ANNUAL REPORT 2024
12

Paladin’s business strategy places us on the pathway to 
becoming a world-class uranium producer and clean energy 
leader. 
Having delivered the LHM Restart Project and recommenced 
production at the LHM, we aim to: 
•	 Ramp up production to nameplate capacity of 6Mlb per 
annum by the end of CY2025, and continue to layer the 
contract book with top-tier counterparties to provide the right 
balance of risk protection and pricing upside to shareholders 
•	 Deliver on our global development and exploration potential 
with the Michelin Pre-Feasibility Study, the extension and 
growth of the LHM and advancement of the Australian assets 
•	 Sustainably create value and contribute to the decarbonisation 
of global electricity generation, by embedding sustainable 
returns and establishing a capital management framework to 
drive long-term value to shareholders via returns on capital, 
organic growth and M&A activity. 
Highlights 
	
Health and Safety 
•	 In completing the LHM Restart Project, over 2.5 million 
hours were worked with no serious injuries or reportable 
environmental incidents
•	 The rolling total recordable injury frequency rate (TRIFR)  
per million hours worked at the LHM as at 30 June 2024  
was 4.4, and 3.8 for the Company
•	 The Company was pleased to exceed the FY2024 safety 
targets set, and has a continued ongoing focus to drive 
improvements in safety performance, delivering operationally 
targeted safety interventions and training programs  
•	 An independent survey conducted at the LHM found 
there to be an extremely positive culture, with high levels 
of cooperation, respect and care among employees and 
managers
•	 98% local employees at the LHM in Namibia, and 99% of 
the LHM employees and mining contractors reside locally, 
reflecting our commitment to the communities in which  
we operate. 
 
 	
Operational Performance
•	 Following the achievement of commercial production at the 
LHM on 30 March 2024, production ramped up with 517,597lb 
U3O8 produced to 30 June 2024
•	 In addition to the stated production, metal-in-circuit was 
increased across the plant as part of the initial operations 
activities
•	 The LHM Restart Project was completed on time and within 
cost forecast, with total project expenditure of US$119.7M
•	 Paladin successfully achieved the commercial production 
targets set for FY2024 on time and below the Restart Project 
and Operational Readiness budget, and the LHM will continue 
to ramp up during FY2025 
•	 The Company appointed Trollope Mining Namibia, a market 
leading mining contractor in Africa, for the stockpile reclaim 
phase of operations
•	 The first customer shipment, containing 319,229lb U3O8, 
departed Walvis Bay, Namibia in July 2024, with a partial 
advance payment under the terms of the customer offtake 
agreement of US$24.8M received in July 2024
•	 The LHM Restart Project commenced in July 2022, and was 
focused on the Repairs & Refurbishment and debottlenecking 
of the existing LHM plant which was placed into Care and 
Maintenance in 2018
•	 The key Repair & Refurbishment work streams delivered to 
return the LHM to production included:
	
−Civil/structural improvement works (concrete, steel)
	
−Mechanical refurbishment works (pumps, pulleys, 
conveyors, ancillaries)
	
−Piping & valve refurbishment and replacement works 
(pipes, valves, racks, mounts)
	
−Electrical improvement works (uninterrupted power  
supply units, lighting, plant electricals)
	
−Control & Instrumentation refurbishment works  
(repairs, replacement, calibration and recommissioning  
of all instruments)
•	 Debottlenecking upgrades, delivered to derisk production 
and increase throughput capacity and operational availability 
of the plant whilst improving environmental and sustainability 
aspects of the plant and operations, included the following 
work streams:
	
−Automated, dustless drumming Final Product Recovery 
(FPR) plant
	
−Control system upgrade
	
−Addition of leach feed surge tanks 
	
−Tailings dewatering upgrade
	
−ROM bin upgrades
	
−Primary classification cyclone upgrade
	
−Pre-leach and CCD feed well upgrade
	
−Product thickener improvements
	
−NamWater infrastructure upgrade
	
−NamPower infrastructure upgrade
•	 All permits, licences and necessary contracts have been 
secured and remain in good standing. 
Operating and Financial Review
PALADIN ENERGY ANNUAL REPORT 2024
13

	
Exploration
•	 During the year, the Company undertook the work required 
to meet tenement commitments at its exploration projects 
in Canada and Australia, and rehabilitation monitoring 
continued across all locations without incident
•	 The Company was pleased to exceed the growth targets set 
for FY2024
•	 Paladin holds a 100% interest in the Michelin advanced 
exploration project in Labrador, Canada (Michelin Project).  
As announced on 18 October 2023, Paladin’s interest, through 
its subsidiary Aurora Energy Limited (Aurora), in the Michelin 
Project increased from 75% to 100%. As a result of the 
funding and dilution provisions of the Michelin Joint Venture 
Agreement, the Michelin Nominees surrendered their 25% 
participating interest in the Michelin Joint Venture to Aurora
•	 The Company has been granted mineral licences for 
prospective new ground adjoining the Michelin Project and 
has exclusive rights to explore these tenements
•	 A Pre-Feasibility Study (PFS) is commencing to build upon 
the substantial exploration activity completed at Michelin. 
The PFS work will update previous work conducted at 
Michelin in 2009 which highlighted the potential for a 6Mlb 
per annum operation
•	 The PFS will also evaluate alternative development options 
with the potential to reduce capital expenditure, deliver the 
initial project execution plan and progress the Environmental 
Impact Assessment timeline
•	 Exploration activities at Michelin are continuing, aimed at 
identifying and defining additional shallow deposit resource 
extensions. 
 
	
Uranium Marketing Activities
•	 The Company has a geographically diverse world-class 
offtake contract book with leading global uranium industry 
counterparties in the US, Europe and Asia
•	 These contracts range in type and duration and provide 
fixed-price, base-escalated and market-related pricing 
mechanisms, with significant exposure to the uranium spot 
price retained through to the end of CY2030
•	 The Company has flexible shipping arrangements and early 
payment terms with its largest customer, providing flexibility 
and improved cash flow during the ramp up of operations at 
the LHM
•	 The uranium term market fundamentals remain strong and 
Paladin continues to actively engage with top-tier industry 
counterparties. The Company will continue to layer in 
industry-leading offtake agreements as production ramps up 
at the LHM  
•	 Paladin has executed commercial agreements with all three 
Western conversion facilities and has secured the necessary 
shipping arrangements. 
 
	
Corporate
•	 Paladin’s 2023 Sustainability Report was published on  
17 October 2023, confirming the Company’s commitment  
to delivering value through sustainable development
•	 The Company executed a US$150M Syndicated Debt 
Facility on 24 January 2024 with Nedbank Limited, acting 
through its Corporate and Investment Banking Division, and 
Macquarie Bank Limited. The Debt Facility provides capital 
flexibility as the Company recommences operations at the 
LHM and progresses its growth options 
•	 The Company’s shareholders approved the consolidation  
of the Company’s issued capital on a ten for one basis on  
9 April 2024
•	 On 24 June 2004, Paladin and Fission announced they 
had entered into a definitive agreement, pursuant to which 
Paladin will acquire 100% of the issued and outstanding 
shares of Fission
•	 Paladin exceeded its growth and corporate strategic goals 
set for FY2024 and had an outstanding Total Shareholder 
Return of +71% for the year
•	 The Group had cash and cash equivalents at 30 June 2024 
of US$48.9M (excluding restricted cash of US$4.3M) and had 
US$80M in undrawn debt facilities (US$70M in debt drawn).
Operating and Financial Review
PALADIN ENERGY ANNUAL REPORT 2024
14

Earnings
Net profit after tax from continuing operations includes:
•	 The reversal of net realisable value write downs of the existing 
LHM ore stockpiles (previously recognised in FY2016) as at  
31 December 2023 which was recognised as a result of 
improved economic circumstances, including the LHM Restart 
Project progress, the negotiation of key offtake contracts and 
the improvement in the uranium market prices. The reversal 
resulted in a gain of US$92.2M. Approximately 45% of the 
original stockpile previously written down was processed prior 
to the LHM going into Care and Maintenance (refer Note 16)
•	 A foreign exchange loss of US$1.9M (2023: foreign exchange 
gain of US$0.6M) which is predominantly due to the foreign 
exchange translation of the environmental rehabilitation 
provision in Namibia and the bank accounts denominated in 
Australian dollars. The Namibian dollar appreciated by 3% 
against the USD during the year, from US$1:N$18.7246 at  
30 June 2023 to US$1:N$18.1773 at 30 June 2024.
Cash Flows
The Group had unrestricted cash and cash equivalents at 
30 June 2024 of US$48.9M. Unrestricted cash and cash 
equivalents decreased by US$77.8M during the year comprising 
of the following cash flows:
Inflows:
•	 Syndicated Debt Facility – US$70.0M received
•	 Interest received and other income – US$2.4M received
•	 Sale of investments – US$1.9M received from the sale of 
shares in Lotus Resources
Outflows:
•	 LHM Restart Project costs – US$79.2M for the Restart 
Project into Property Plant and Equipment
•	 LHM operations expenditure – US$34.5M for operational 
expenditure
•	 Corporate and administration expenditure – US$15.0M for 
corporate and staff costs 
•	 LHM mine development costs – US$9.2M capitalised as  
pre-production costs
•	 Exploration expenditure – US$5.9M reflecting a summer and 
winter drilling campaign in Canada and to meet tenement 
commitments for exploration projects
•	 Transaction costs and interest expense related to borrowings 
– US$4.1M transaction costs and US$1.1M interest expense 
on the US$150M Syndicated Debt Facility
•	 Property, plant and equipment – US$2.2M to acquire new 
property, plant and equipment outside the Restart Project
•	 Effect of movement in exchange rates on cash held 
– US$0.9M cash decrease predominantly due to the 
translation of Australian dollars held.
Financial Position
Unrestricted Group cash and cash equivalents decreased by 
61% to US$48.9M. At 30 June 2024 Paladin held US$68M in 
corporate debt net of transaction costs and accrued interest 
(gross debt US$70M) and shareholder loans of US$97M. 
The Company’s gearing ratio at 30 June 2024 was 4.60%  
(30 June 2023 - Nil) excluding the CNNC shareholder loans.  
The change in gearing is attributable to Paladin entering into, and 
drawing down from, a Syndicated Debt Facility during the year.
Financial Performance
Key financial performance metric
Year ended 30 June
2024
2023
% Change
Net profit/(loss) after tax from continuing operations
US$’000 
59,998
(27,058)
322%
Cash Flows
Cash outflow from operating activities
US$’000 
(48,116)
(9,375)
(413%)
Capital expenditure
US$’000 
(96,598)
(39,599)
(144%)
Free cash flows
US$’000 
(142,764)
(48,974)
(195%)
Financial Position
Unrestricted cash and cash equivalents
US$’000 
48,858
126,636
(61%)
Debt (principal amount + accrued interest)1
US$’000 
68,033
-
n/a
Net debt
US$’000 
19,175
-
n/a
Total equity
US$’000 
397,815
335,084
19%
Total capital (Net debt + equity)
US$’000 
416,990
335,084
24%
Gearing ratio (Net debt / Total capital)
% 
4.60%
-
n/a
Operating and Financial Review
1	 Excludes shareholder loans from CNNC.
PALADIN ENERGY ANNUAL REPORT 2024
15

Operating and Financial Review
Risk Management 
MANAGING OUR RISKS TO CREATE  
LONG TERM SHAREHOLDER VALUE 
Risk management is fundamental to maximising the value of 
Paladin’s business, informing its strategic direction and meeting 
the standards and expectations of stakeholders. 
Paladin recognises that the classification and effective 
management of risk, including prudent, informed risk taking 
is an essential part of Paladin’s aim of creating long term 
shareholder value. Paladin’s Risk Management Policy aims 
to integrate risk management into Paladin’s strategy and 
business. The Risk Management Policy outlines the minimum 
mandatory requirements for the management of risks that can 
materially impact Paladin’s ability to achieve its strategy and 
business plans. 
Paladin's Risk Management Framework supports and 
guides the processes by which risk is identified, assessed, 
managed, communicated and reported. It ensures that the risk 
management approach is holistic and coordinated, and aligns 
with Australian Standard AS/NZS ISO 31000:2018. The aim is 
to ensure early identification of risk, and to have appropriate 
controls either in place, or identified, to ensure Company 
strategies and objectives remain viable. By adopting a culture 
of actively managing risk, Paladin has made a commitment 
to the development and deployment of risk management and 
strives to enhance its corporate governance and business 
management processes. 
Risk appetite 
Risk appetite is the level of residual risk that Paladin is willing to 
accept in pursuit of its strategy, which is established across our 
business activities. The Board regularly considers and approves 
the risk appetite developed by management. Understanding 
risk appetite across our strategic risks assists in decision 
making across Paladin.
Material business risks 
Material business risks are those which can materially impact 
Paladin’s ability to achieve its strategy and business plans. They 
have the capacity to affect all, or a significant part, of the Group 
and therefore tend to have significant impacts. 
The effective management of Paladin’s material risks is routinely 
assessed by Management. The assessment process is informed 
by external and internal events that could have a potential 
impact on the organisation, as well as emerging themes across 
identified material risks. 
An overview of these risks is regularly reviewed by the Audit & 
Risk Committee, which assists the Board in carrying out its role 
of overseeing risk management and assurance practices.
PALADIN ENERGY ANNUAL REPORT 2024
16

To create long term 
shareholder value
PALADIN ENERGY ANNUAL REPORT 2024
17

Paladin values and respects all people – both its workforce and 
stakeholders – putting their health, safety and wellbeing at the 
forefront of a positive culture. 
Paladin is committed to conducting its activities to the highest 
standards of occupational health and safety to ensure the 
wellbeing of its people, contractors, and communities both 
locally and globally.
The Health and Safety risk has inherently increased with the 
commencement of production however management have 
implemented mitigating controls to manage this risk.
Opportunities
Paladin is fully committed to providing and maintaining a safe, 
secure and healthy work environment with the aim of zero harm 
from occupational injuries and illness in the workplace.
Paladin fosters the safe and ethical behaviour of employees and 
contractors which ensures alignment with its values, culture 
and strategic objectives. Paladin establishes a mindset that all 
injuries are preventable. Throughout the year Paladin continued 
to promote safety and responsibility to all employees and 
contractors.
Risks
•	 Uranium exploration, mining and processing is inherently a 
high-risk environment. Additionally, where Paladin has an 
interest located in a developing country, embedding systems 
for managing occupational health and safety risks, and 
maintaining and ensuring compliance with these systems may 
present challenges for Paladin;
•	 If there is a failure to comply with the necessary occupational 
health and safety requirements, this could result in injury, 
safety claims, fines, penalties and compensation for damages 
against Paladin, as well as reputational damage resulting in 
losses and delays, which may adversely affect profitability.
Management risk mitigating strategy includes:
•	 Paladin focuses on the health, safety and wellbeing of its 
people, contractors, and communities in everything it does. 
The Company continuously strives to improve its work 
environment with the aim of making it safer, healthier, and 
more productive for its people;
•	 Paladin’s safety philosophy is based upon ethical conduct, 
mutual trust, respect and teamwork. At-risk behaviours are 
not tolerated and proactive monitoring and re-enforcement 
of positive behaviour, along with visible leadership are a key 
focus;
•	 Paladin engages, develops, and trains its people so that 
its work is well designed and executed, and focuses on 
the continued development of skills and expertise through 
structured and informal learning and training;
•	 Paladin has a system of risk management and comprehensive 
health and safety policies, which are expected to be followed 
at all of Paladin’s locations. Throughout the year Paladin 
continued to promote safety and responsibility to all its 
employees and contractors through inductions, high risk 
task training and verification of competency, fitness for work 
assessments, site monitoring, health monitoring, pre-job 
risk assessments, safety meetings, audits and inspections, 
emergency drills and provision of appropriate PPE to the 
employees working on site;
•	 Key performance measures and targets are set, and are 
measured and reported regularly;
•	 The Company investigates actual and potential significant 
events that could have led to severe injury or high 
consequence outcomes, puts controls in place and shares  
the learnings across the organisation.
Operating and Financial Review
Health and Safety
Material Business Risks
The material business risks identified by Paladin are set out below:
PALADIN ENERGY ANNUAL REPORT 2024
18

Paladin aims to have reliable operational performance to allow it 
to deliver on its operational objectives and satisfy its obligations 
to customers, regulators, and communities.
Supply chains have a significant influence on the way Paladin 
operates and the results it generates. The Company relies on 
various key customers, supplier relationships and contractors to 
conduct various aspects of its operations.
The inherent production, operations and supply chain risks have 
increased with the commencement of production, however 
the Company has developed risk mitigation strategies and 
implemented controls to mitigate the increased inherent risks. 
The Company expects this risk to continue but does not expect 
any significant change in this risk in the coming years. 
Opportunities
Optimised operations, and sustainable management of supply 
chain risk facilitates the smooth and reliable operation of 
the business that meets or exceeds the expectation of the 
Company’s stakeholders, without incurring unreasonable costs.
Continuous improvement in operations and processes facilitate 
stable and reliable performance to generate optimal value to 
Paladin’s business.
Risks
•	 Paladin’s operations are subject to the operating risks 
associated with the production of uranium, including 
the performance of processing facilities against design 
specification, the achievement of agreed product specification, 
and the related risks associated with the storage and 
transportation of raw materials, finished products and waste;
•	 The LHM depends on suppliers for raw materials, power, 
water, services, equipment and infrastructure for its 
operations, and on logistics providers to ensure products are 
delivered;
•	 The Company has entered into agreements with suppliers 
in different jurisdictions including Australia, Canada and 
Namibia. As a result, the Company is exposed to foreign 
currency fluctuations;
•	 Failure to effectively maintain and develop relationships with 
local communities and stakeholders could result in adverse 
outcomes to Paladin’s operations and production;
•	 Lack of availability and affordability of infrastructure, 
suppliers and reliable transportation facilities to deliver 
products to market could impact production, sales and 
development of projects;
•	 Any or all of these events could have an adverse impact 
on the Company’s operations and its ability to operate 
projects profitably, thereby impacting cashflows and financial 
performance.
Management risk mitigating strategy includes:
•	 Paladin maintains a system of planned preventative and 
planned corrective maintenance to maximise the availability  
of key assets;
•	 Paladin utilises systems to maintain appropriate equipment 
spares at levels that mitigate the risk of production loss; 
•	 Paladin has obtained insurance to mitigate the impact of risks 
where available;
•	 Paladin manages operating costs and improves plant reliability 
by investing in infrastructure, new technology and business 
process improvements;
•	 Paladin carries out quality assurance programs over its 
products and operations;
•	 Paladin undertakes initiatives to increase opportunities 
for local suppliers, and continues to build strong strategic 
partnerships with key suppliers and contractors on a long-
term, mutually beneficial basis;
•	 Paladin uses its understanding of risk to design controls 
to support reliable operations. This may include working 
closely with vendors to match availability with demand; 
understanding options for alternative sources of supply and 
implementing alternative sources of supply where required; 
optimising inventory levels; flexing commercial terms and 
maintaining up-to-date business continuity plans;
•	 The Company understands, assesses, and continually 
monitors the risks in its supply chain with its management 
information system, that considers the supply of critical 
goods and services. This includes risk relating to potential 
shortages, critical suppliers and categories, vendor liquidity 
and logistics.
Operating and Financial Review
Production, Operations and Supply Chain 
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
19

Demand, Product Pricing and Offtake Agreements
Material Business Risks
Operating and Financial Review
Paladin continues to build relationships with top-tier industry 
counterparties and has underpinned its production with long-term 
cornerstone geographically diverse offtake agreements with  
a balance of pricing mechanisms.
The Company expects this risk to continue, but the risk is being 
mitigated by the establishment of relationships with global 
industry-leading uranium counterparties, and the layering of 
the offtake book with contracts of different types, duration and 
various pricing mechanisms providing some price protection.
Opportunities
Paladin seeks to derive the best value for its stakeholders by 
reliably delivering high quality product to reputable customers.
Paladin has built and continues to develop its leading contract 
book by systematically layering its contract portfolio with 
industry-leading counterparties to deliver value and certainty to 
its stakeholders. 
The Company has executed offtake agreements with top-tier 
counterparties in the US, Europe and Asia. These contracts 
range in type and duration and provide fixed-price, base-
escalated and market-related pricing mechanisms, which provide 
certainty whilst maintaining exposure to the uranium spot price.
Risks
•	 The price of, and demand for, uranium remains sensitive 
to several external macroeconomic and political factors 
beyond the Company’s control. There is the potential for 
events to occur in the future that may negatively impact the 
attractiveness of nuclear energy and therefore the demand 
for, and the price of, uranium;
•	 Nuclear energy is in direct competition with other more 
conventional sources of energy, including gas, coal and 
hydroelectricity and may be the subject of negative public 
opinion due to political, technological, and environmental 
factors. This may have a negative impact on the demand for, 
and the price of, uranium;
•	 The uranium market is influenced by production levels and 
costs of production in major producing regions such as Russia 
and former Soviet republics, Canada, Africa and Australia;
•	 Paladin enters into agreements and undertakings with third 
parties. If the Company is unable to satisfy the conditions, or 
third parties default on their obligations under the agreements 
and undertakings, the Company may be adversely affected;
•	 Any or all of these events could have an adverse impact on 
the Company’s operations, financial performance or cashflow 
which are beyond its control.
Management risk mitigating strategy includes:
•	 Paladin has a geographically diverse offtake book, with 
contracts executed with highly rated top-tier counterparties;
•	 Paladin maintains a balanced and flexible contract portfolio 
that layers in volumes over time, with contracts that range in 
type and duration;
•	 Paladin’s bilaterally negotiated contracts provide a mix of 
fixed-price, base-escalated and market-related pricing 
mechanisms, including provisions that provide exposure to 
rising market prices whilst reducing the exposure to market 
volatility;
•	 Paladin continues to layer in industry-leading offtake 
agreements as production ramps up at the LHM;
•	 The Company regularly monitors the credit risk of customers 
as part of normal business practice.
PALADIN ENERGY ANNUAL REPORT 2024
20

Paladin recognises that excellence in environmental performance 
(including the potential impact of climate change and 
preparedness for natural catastrophic events) is essential to 
business success and to achieving the Company’s sustainable 
development objectives.
Paladin’s uranium exploration, mine development and operational 
activities have the potential to impact the environment and 
require proactive management to minimise any potential 
impact to water resources, air quality or biodiversity. Paladin’s 
operations, assets, infrastructure and logistics network, 
communities, and broader value chains may be exposed to the 
impacts of extreme weather events, such as drought, flooding, 
heatwaves and fires. Climate change is expected to impact the 
frequency, intensity, and likelihood of extreme events that could 
impact people’s safety, wellbeing, security and key operating 
infrastructure.
The Company expects this risk to increase with the growing 
focus on the environment and climate change.
Opportunities
Paladin strives to minimise its impact on the environment through 
effective environmental management across all aspects of its 
portfolio, preventing, minimising, mitigating and remediating 
any adverse impacts of its operations on the environment 
and achieving continuous improvement in environmental 
performance.
By understanding specific exposures across Paladin’s portfolio, 
capital programs and actions to address climate change and 
environment related risks, the Company can incorporate 
measures to minimise environmental impact and improve its 
resilience in the event of an extreme climatic event. 
Risks
•	 Paladin’s operations may use hazardous materials and 
produce hazardous waste, which may have an adverse 
impact to people and on the environment. Failure to manage 
this risk appropriately may lead to loss of reputation, claims 
for damages, increased regulation and may also limit the 
Company’s ability to access capital and talent;
•	 Increased regulation of greenhouse gas emissions could 
adversely affect the cost of operations; 
•	 Failure to manage major events or natural catastrophes 
could result in a significant event or other long-term damage 
that could harm operations, employees, the communities in 
which it operates, access to logistics chains, critical goods 
and services, financial performance, and Paladin’s licence to 
operate.
Management risk mitigating strategy includes:
•	 Paladin’s commitment to the environment is managed through 
its Environmental Policy, with a suite of underlying policies, 
processes, management, monitoring and mitigation plans. 
The policies and guidelines focus primarily on water and land 
use management, rehabilitation, mineral waste and reducing 
greenhouse gas emissions;
•	 Paladin fosters proactive relationships with international 
organisations, governments, and environmental departments 
and organisations;
•	 Paladin regularly provides comprehensive reporting to 
Environmental Regulatory bodies in the jurisdictions in which 
it operates. This provides the Company with the opportunity 
to monitor and review its environmental impact thoroughly on 
a regular basis;
•	 Paladin uses climate analytics including weather forecasts 
and climate outlooks, and will undertake scenario planning, 
to gain quantitative insights into physical climate risks. This 
data will assist in the identification of physical climate risks, 
management and adaptation thereof, and will be the basis for 
developing scenario analysis and mitigation strategies; 
•	 Paladin is transparent in its disclosure of environment and 
climate-related opportunities and threats in its annual 
Sustainability Report, in accordance with the Sustainability 
Accounting Standards Board (SASB) framework, Global 
Reporting Initiative (GRI) Sustainability Reporting Standards 
and recommendations of the Task Force on Climate-related 
Financial Disclosures (TCFD). The Company will also comply 
with the International Sustainability Board (ISSB) Sustainability 
Disclosure Standards; 
•	 Paladin has specific Emergency Response and Preparedness 
actions and plans in place, with specialised training provided 
to the Emergency Response Team and basic training provided 
to a number of other employees;
•	 The Company purchases insurance coverage against many, 
but not all, potential losses or liabilities arising from major 
events or natural catastrophes. Paladin will maintain insurance 
where it is considered appropriate for its needs, but insurance 
against all risks may not be obtained because either such 
cover is not always available or affordable.
Environment, Climate Change and Natural Events
Operating and Financial Review
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
21

Operating and Financial Review
Paladin adopts a disciplined approach to allocating capital to 
maintain a strong balance sheet, providing financial flexibility 
regardless of market conditions.
The Company expects this risk to decrease as production from 
the LHM ramps up and revenues are received from operations.
Opportunities
Paladin understands that effective management of capital and 
liquidity allows it to achieve financial stability and its long term 
strategy, and maintain its relationships with investment grade 
credit rated financial institutions. This allows the Company to 
optimise its funding and allocate capital to the right projects at 
the right time. 
Risks
•	 Uranium markets may be subject to volatility, and other 
factors including disruptions in the financial sector, which 
may make it difficult to obtain debt or equity financing on 
favourable terms or at all. Failure to obtain such financing on 
a timely basis may cause the postponement of development 
plans, forfeiture of rights in some or all of the Company’s 
properties or reduce or terminate some or all of its operations, 
which may have a material adverse effect on the overall 
financial position and performance of the Company, and 
thereby shareholder value;
•	 Failure to maintain compliance with debt covenants could 
have an adverse effect on the Company’s business, results 
of operations and its ability to maintain financial stability and 
liquidity.
Management risk mitigating strategy includes:
•	 Paladin maintains ongoing engagement with financial 
institutions including the provision of financial information  
and forecasts supporting its long-term strategy; 
•	 Paladin regularly reviews loan agreements and assesses 
whether a breach or default is likely by calculating relevant 
metrics and reviewing the relevant debt covenants;
•	 The Company takes action to ensure compliance with debt 
covenants through efficient management of borrowings 
and the allocation of funds for operational and capital 
requirements.
Capital Management and Liquidity
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
22

Paladin’s ability to achieve its business strategy depends on 
attracting, developing, and retaining a wide range of skilled and 
experienced people.
To align with the evolving needs of its people, business, and 
broader stakeholders, Paladin continuously monitors its culture 
and seeks feedback to improve the Company’s culture and 
enhance the employee experience.
The Company expects this risk to increase as the number 
of employees has grown significantly as operations have 
recommenced, however Paladin is managing this risk through  
the implementation of an enhanced organisational framework.
Opportunities
By acting on a strategy to attract, develop and retain people, 
Paladin creates an employee experience that motivates all 
employees to deliver on the Company’s strategic objectives, 
together.
Risks
•	 Behaviours that do not align with the Company’s culture could 
expose Paladin to conduct risks including, but not limited to 
delays in appropriately escalating regulatory and compliance 
issues, failure to resolve issues in a timely manner and failure 
to deliver on product and service commitments;
•	 Paladin may not have the ability to attract and retain skilled 
labour, and this may result in a loss of corporate knowledge 
and experience;
•	 Lower levels of engagement may lead to disconnected teams 
that lack diversity and operate in silos. Decision making 
based on factors other than performance may impact the 
Company’s ability to attract and retain talent. This in turn may 
lead to significant shareholder value erosion and reputational 
damage;
•	 Relationships with employees may be impacted by changes in 
labour relations, which may be introduced by, among others, 
employee groups, unions, and the relevant governmental 
authorities in jurisdictions where Paladin carries on business. 
Adverse changes in such legislation or in the relationship with 
the Company’s employees may have a material adverse effect 
on the business, results of operations, and financial position.
Management risk mitigating strategy includes:
•	 Paladin strives to build inclusion and diversity in its workplace 
where everyone is valued and can participate to achieve their 
full potential. The Company does not tolerate any form of 
inappropriate conduct which includes bullying, harassment, 
discrimination, or victimisation;
•	 Paladin’s talent acquisition strategy includes competitive 
remuneration and employee benefits, providing role specific 
training to upskill employees, and supporting further 
education;
•	 Paladin recognises and rewards its people, which enables the 
Company to attract appropriate skills and experience, engage 
employees and improve performance;
•	 Paladin’s Code of Business Conduct and Ethics (Code of 
Conduct) sets out the expected standards of conduct, with 
formal training and assessment in place;
•	 Paladin conducts third party culture surveys to help 
understand how employees experience their workplace. 
These are used to build plans to enhance employee 
experience;
•	 Paladin has a flexible work policy which empowers leaders to 
engage with their teams to determine the ways of working 
that balance individual, team, and business requirements;
•	 Paladin conducts ongoing monitoring of the global talent 
market, developments, and trends, including talent mobility, 
incorporating this into the Company’s talent acquisition 
strategy that targets multiple labour markets and diverse skills.
Operating and Financial Review
Corporate Culture and Managing Diverse Talent
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
23

Operating and Financial Review
Paladin ensures that its IT systems and infrastructure are 
maintained to a standard that reduces the risk of disruption  
to operations.
Paladin manages the risk of cybersecurity events to minimise any 
disruption to its critical systems and/or loss of essential data.
Paladin expects this risk to increase in future as cybersecurity 
attacks become more frequent and sophisticated.
The value of a robust cybersecurity function extends beyond the 
protection of information, productivity, and people, and provides 
us with future business opportunities through technology 
innovation and evolution.
Opportunities
Paladin endeavours to respond to technology and innovation 
opportunities to protect and deliver against shareholder 
expectations on returns.
Paladin recognises the importance of effectively identifying, 
developing and adopting sustainable business models for 
cybersecurity, information technology and innovation in 
operations. 
Risks
•	 Cyber breaches can arise from malicious external or internal 
attacks, and sometimes inadvertently through human error. 
Although the extent and frequency of cybersecurity threats 
remains in line with expectations, attacks have been observed 
to be more destructive in nature. The ongoing digitisation and 
transformation of information and operational technology, and 
the increasing use of AI to inform and automate decisions, 
amplifies the threat of loss of control systems and data or 
hijacking of autonomous functions;
•	 Failure to keep pace with and leverage advances in 
technology and innovation could result in reduced 
shareholder returns and impact the Company’s licence to 
operate. Failure to adopt automation and digitise processes 
could result in deteriorating performance across safety, 
productivity, and returns;
•	 In a rapidly evolving market, failure to be innovative can expose 
the Company to several significant risks and challenges such 
as a loss of competitive advantage, disruptions to operations, 
reputational damage, ability to retain quality personnel, and 
increases in capital or operating costs.
Management risk mitigating strategy includes:
•	 The Company maintains Australian Cyber Security Centre 
(ACSC) membership and participates in regular updates;
•	 In addition to annual penetration testing, Paladin actively 
monitors cybersecurity risks and has established disaster 
recovery strategies and cybersecurity practices which are 
benchmarked and subject to an independent Cyber Security 
Architecture Assessment; 
•	 Paladin is progressing implementation of the ACSC Essential 
Eight mitigation strategies and regularly reviews their 
implementation status; 
•	 In recognition of the role all employees play in keeping 
information and systems secure, clear expectations for data 
privacy, cybersecurity and handling of confidential information 
are set out in the Company’s policies; 
•	 Paladin utilises Company wide cybersecurity training and 
awareness programs;
•	 Paladin fosters a culture of innovation, stays abreast of 
market trends and dynamically adapts its business strategies.
IT systems and infrastructure, Cybersecurity and Innovation
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
24

Operating and Financial Review
Paladin acknowledges that changes in government, legislation, 
regulation, policy, and geopolitical activity have the potential to 
impact the Company’s strategic objectives and the way it works. 
This includes broader policy decisions and regulatory changes, 
related but not limited to, changes to royalty and taxation policy, 
nationalisation of mineral resources, supply chains, renegotiation 
or termination of contracts, leases, permits or agreements, 
climate change and emissions reduction requirements and 
environmental and social performance requirements. 
The Company expects this risk may increase in future with the 
recent global geopolitical uncertainty and focus on climate 
change and emissions reduction requirements.
Opportunities
The Company expects full compliance with operational 
procedures, laws, regulations, and policy obligations. 
Paladin aims to effectively manage the uncertainty of potential 
changes through engagement with key stakeholders and 
industry associations, monitoring of political activity, policy, 
legislative and regulatory changes.
Risks
•	 A serious breach in laws, regulations, policies and obligations 
in relation to anti-corruption legislation or sanctions, human 
rights, labour or employment matters, anti-trust rules, or 
inappropriate business conduct, could result in serious harm 
to people and significant reputational and financial damage;
•	 Paladin has tenements in Australia and Canada, and an 
operating uranium mine in Namibia. These jurisdictions have 
different laws, regulations and legal matters to comply with. 
Future earnings, asset values and relative attractiveness of 
the Company’s shares may be affected by changes in the law 
and government policy in these jurisdictions;
•	 Paladin’s activities are subject to extensive laws and 
regulations controlling not only the mining of and exploration 
for mineral properties, but also the possible effects of such 
activities upon the environment and upon interests of native 
and/or Indigenous peoples. Future legislation, regulations, 
political changes or other disruptions may cause additional 
expense, capital expenditures, restrictions and delays in the 
development of the Company’s assets, the extent of which 
cannot be predicted; 
•	 The costs of compliance with the above noted laws and 
regulations may increase the cost of exploring, drilling, 
developing, constructing, operating and mine closure costs.
Management risk mitigating strategy includes:
•	 Paladin has in-house specialist knowledge and expertise, 
and engages external experts as required in the relevant 
jurisdiction, in areas including tax management capability,  
tax advice, regulatory and external affairs advice;
•	 Paladin monitors political activity, policy, and legislative and 
regulatory changes in the jurisdictions where the Company 
operates;
•	 Paladin also engages with relevant authorities to understand 
and mitigate potential impacts on the Company’s business 
performance;
•	 Paladin engages with key stakeholders in all jurisdictions 
where the Company operates;
•	 Paladin works with selected industry associations and is 
engaged with industry developments;
•	 Paladin engages in training and building awareness of 
compliance and regulatory requirements and obligations  
for employees.
Political, Legal, Regulatory and Policy Matters
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
25

Operating and Financial Review
Paladin endeavours to improve its return on investment and 
create shareholder value by carefully evaluating organic and 
inorganic growth and investment opportunities. 
The Company expects this risk may increase with the increased 
likelihood of growth and investment opportunities.
Opportunities
Paladin looks at prospects to maximise its portfolio potential of 
world-class production and growth assets, through acquisition of 
operations or development options with a strong and sustainable 
outlook, in jurisdictions where it believes the Company can 
operate in line with its values and Code of Conduct.
Risks
•	 Paladin may be unable to identify or execute suitable growth 
opportunities, and a failure to do so could have an adverse 
impact on the shareholders and value of the Company;
•	 Business acquisitions entail a number of inherent risks, 
including the effective integration of the relevant asset or 
business, the realisation of synergies, significant one-time 
write-offs or re-structuring changes and unanticipated 
costs and liabilities, such that the expected benefits of an 
acquisition may not be realised; 
•	 Planned acquisitions may be impacted by material adverse 
issues whether identified or unidentified through a failure on 
the part of due diligence, liabilities for past acts, or omissions 
or liabilities of companies or businesses or properties 
acquired or disposed of which may be unforeseen or greater 
than anticipated;
•	 Financial projections, estimates and assumptions supporting 
the business acquisitions may not be realised;
•	 Larger established mining companies with substantial 
capabilities and greater financial and technical resources, may 
provide significant and increased competition and Paladin 
may be unable to acquire an existing business or rights to 
exploit additional attractive mining properties on terms the 
Company considers acceptable;
•	 Arrangements may be subject to the satisfaction of several 
conditions including regulatory approvals, and there can be 
no certainty that all conditions precedent to an arrangement 
will be satisfied. Non completion of an arrangement may 
result in significant losses including a decline in share price, 
future business and operations; 
•	 Paladin may enter into agreements and undertakings with 
third parties from time to time. If Paladin is unable to satisfy 
the conditions of these agreements and undertakings, 
or if the Company defaults on its obligations under these 
agreements and undertakings, its interest in their subject 
matter may be jeopardised. Further, if the third parties default 
on their obligations under the agreements and undertakings, 
the Company may be adversely affected;
•	 There is a risk of financial failure or default by a participant in 
any joint venture or arrangement to which Paladin is or may 
become a party, or the insolvency or managerial failure by any 
of the contractors used by the Company in any of its activities 
or the insolvency or other managerial failure by any of the 
other service providers used by the Company for any activity.
Management risk mitigating strategy includes:
•	 Paladin assesses opportunities based on its long-term 
strategy and funding capacity;
•	 Paladin engages with external specialists during the 
evaluation of growth opportunities such as expansion or 
acquisition, including the involvement of lawyers, advisors, 
and consultants whilst conducting comprehensive due 
diligence;
•	 Paladin adheres to the legal and regulatory requirements of 
the country where an acquisition opportunity is identified; 
•	 Paladin leverages its in-house capabilities to grow the 
Company and shareholder value through organic and 
inorganic growth; 
•	 Paladin continuously evaluates projects or targets to enhance 
shareholder value, including the potential acquisition of 
companies;
•	 Paladin sets clear expectations, scope and responsibilities 
between the parties to any agreement where a joint 
arrangement or joint venture is planned, and collaborates  
with stakeholders as appropriate;
•	 Paladin carries out regular reviews of commodity prices 
and exchange rates, to develop long-term views for the 
Company’s portfolio and foreign exchange rates for the 
jurisdictions where it operates.
Future Growth Opportunities
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
26

Paladin strives to maintain, realise and enhance the potential of 
its mineral reserves and resources that it is entrusted to develop. 
Paladin expects this risk may change over the coming years as 
the LHM has successfully recommenced operations, and our 
knowledge of the resource and the associated risk of realising its 
potential will improve.
Opportunities
Through the Company’s evolving technical and economic 
understanding of its mineral reserves and resources, Paladin 
seeks to continually optimise its operations and exploration 
activities to identify additional opportunities, thereby adding 
value to its business and ensuring its licence to operate.
Risks
•
Paladin’s Mineral Resource and Ore Reserve estimates are
prepared in accordance with reporting standards, but they are
expressions of judgement from qualified professionals based
on knowledge, experience, industry practice and resource
modelling. As such, Mineral Resource and Ore Reserve
estimates are necessarily imprecise and depend to some
extent on interpretations. Consequently, the estimates may
prove to be inaccurate and require adjustment or revision,
affecting Paladin’s development and mining plans. This in
turn may affect the ability to sustain or increase levels of
production in the longer term;
•
The estimates are appropriate when made but may change
significantly over time as new information becomes available;
•
Paladin may experience delays and cost overruns if it is
unable to access the land required for operations and
exploration activities or is unable to enforce its legal rights.
This may be as a result of weather, environmental restraints,
native title, licences, permits or approvals, landholders’
activities or other factors;
•
These risks, individually or in combination, may have a
significant impact on future shareholder returns, the benefits
stakeholders receive and ultimately the sustainability of the
Company.
Management risk mitigating strategy includes:
•
Paladin engages qualified professionals to prepare mineral
resources and ore reserve estimates based on their
knowledge, experience, industry practice and resource
modelling in accordance with either the reporting standard
JORC 2004 or the reporting standard JORC 2012 as required
in the ASX Listing Rules (Chapter 5);
•
Paladin continuously monitors ore reserves and mineral
resources to ensure currency and validity of licences and to
take prompt action if required;
•
Paladin renews its licences and permits in a timely manner
and obtains the required approvals to ensure it has continued
access to land required for operations and exploration
activities;
•
Paladin’s annual budget process prioritises capital allocation to
projects based on the highest-value opportunities across the
Company’s portfolio to maximise the potential of our resources.
Operating and Financial Review
Mineral Resources and Ore Reserves 
Material Business Risks
PALADIN ENERGY ANNUAL REPORT 2024
27

Project locations and 
resource overview
Langer  
Heinrich
Langer Heinrich is located in central 
western Namibia, approximately 80km 
east of Swakopmund. Langer Heinrich is 
a surficial calcrete type uranium deposit 
containing a JORC Code (2012) compliant 
Mineral Resource of 139Mt containing 
126.9Mlb U3O8 at a grade of 415ppm U3O8 
and 41.1Mlb V2O5 at grade of 135ppm V2O5 
at a cut-off of grade of 200ppm U3O8 with 
a cut-off grade of 250ppm U3O8 applied to 
stockpiles.
The deposit is situated in the 15km long 
paleo drainage system located within the 
Gawib River valley between the Langer 
Heinrich and Schifferberg Mountains.
Langer Heinrich Mine Ore Reserves are 
estimated at 83.8Mt at a grade of 448ppm 
U3O8 containing 82.8Mlb U3O8.
The Langer Heinrich Mine transitioned into 
Care and Maintenance in August 2018, and 
the decision to return the Langer Heinrich 
Mine to production was announced in July 
2022. The Langer Heinrich Mine Restart 
Project was completed on time and within 
cost forecast with first production achieved 
on 30 March 2024. The Langer Heinrich 
Mine will be in operational ramp up during 
FY2025, with ore feed to the plant sourced 
from previously mined stockpiled ore. Paladin 
owns a 75% interest in Langer Heinrich. The 
current reconciliation between stockpile 
depletion and mill feed is -1% grade and -3% 
tonnes over the 6 month period January to 
June 2024 maintaining confidence in the 
values ascribed to the current stockpile.
Ore Reserves and Mineral Resources
1  |  NAMIBIA
Michelin 
Project
Paladin, through its wholly owned subsidiary 
Aurora Energy Ltd (Aurora), holds rights to 
98,325 hectares of mineral claims within 
the Central Mineral Belt of Labrador (CMB), 
Canada, approximately 140km north of Happy 
Valley-Goose Bay and 40km southwest of the 
community of Postville.
Paladin holds a 100% interest in the Michelin 
Project which is an advanced exploration 
project located in the premier mining 
jurisdiction of Newfoundland and Labrador, 
Canada. During the year, Paladin completed 
the process required under the Michelin 
Joint Venture Agreement to use best efforts 
to sell the entirety of the joint venture on 
commercially acceptable terms. 
Paladin’s interest in the Michelin Project 
increased from 75% to 100% as announced on 
18 October 2023.  As a result of the funding 
and dilution provisions of the Michelin Joint 
Venture Agreement, the Michelin Nominees 
surrendered their 25% participating interest in 
the Michelin Joint Venture to Aurora.
The mineral claims cover a significant area of 
prospective ground over the CMB. The claims 
contain 105.6Mlb U3O8 Measured and Indicated 
Mineral Resources as well as an additional 
22Mlb U3O8 Inferred Mineral Resource in six 
deposits. The largest of these deposits is 
Michelin which contains a total JORC Code 
(2012) compliant Mineral Resource of 92.0Mlb 
U3O8, 82.2Mlb of which is classified Measured 
and Indicated. Michelin is still open along strike 
and at depth. Cut-off grades for all deposits 
except Jacques Lake reflect the use of open 
cut (200ppm) and underground (500ppm) 
mining methodologies in the determination of 
prospects for eventual economic extraction. For 
Jacques Lake, there was insufficient Mineral 
Resources remaining after pit optimisation 
studies to warrant any portion being 
considered for underground mining.
2  |  CANADA
PALADIN ENERGY ANNUAL REPORT 2024
28

MANYINGEE &
CARLEY BORE, 
WESTERN AUSTRALIA
ADVANCED 
EXPLORATION
MOUNT ISA, 
QUEENSLAND
ADVANCED 
EXPLORATION
AUSTRALIA 
HEAD OFFICE
NAMIBIA
LANGER HEINRICH
PRODUCTION
CANADA
MICHELIN
ADVANCED EXPLORATION
2
3
1
4
Mount Isa 
Project
The Mount Isa Project, which is wholly 
owned by Paladin, is located 40km north 
of Mount Isa and consists of six Mineral 
Development Licences.
The Mount Isa Project includes 10 
deposits containing 106.2Mlb U3O8 
Measured and Indicated Mineral 
Resources as well as 42.2Mlb U3O8 
Inferred Mineral Resources at a cut-off 
grade of 250ppm U3O8 for all deposits 
except Valhalla, which utilised a cut-off 
grade of 230ppm U3O8.
3  |  QUEENSLAND
Manyingee 
Project
Manyingee, which is wholly owned by 
Paladin, is located in the north-west  
of Western Australia, 1,100km north 
of Perth and 85km inland from the 
coastal township of Onslow. The 
property is comprised of three mining 
leases covering 1,307 hectares. Field 
trials by AFMEX demonstrated that the 
Manyingee sandstone-hosted uranium 
deposit is amenable to extraction by  
in-situ recovery (ISR) in 1985.
Manyingee contains an Indicated 
Mineral Resource of 15.7Mlb U3O8 
grading 850ppm and an Inferred Mineral 
Resource of 10.2Mlb U3O8 grading 
850ppm (JORC Code (2012) compliant) 
at a cut-off grade of 250ppm U3O8.
4  |  WESTERN AUSTRALIA
Carley 
Bore
Carley Bore, which is wholly owned by 
Paladin, is located approximately 100km 
south of Manyingee in Western Australia. 
Carley Bore consists of two contiguous 
exploration licences with granted 
retention status.
The Carley Bore deposit contains 
JORC Code (2012) compliant Mineral 
Resources, 5.0Mlb U3O8 grading 420ppm 
in the Indicated category and 10.6Mlb 
U3O8 grading 280ppm in the Inferred 
category at a cut-off grade of 150ppm 
U3O8. Potential exists for extensions to 
mineralisation north and south of the 
estimated Carley Bore Mineral Resource.
Unless specifically noted, Mineral Resources were 
prepared and first disclosed under the JORC Code 2004. 
These estimates have not been updated since to comply 
with JORC Code (2012) on the basis that the information 
that the estimates are derived from have not materially 
changed since it was last reported.
PALADIN ENERGY ANNUAL REPORT 2024
29

Ore Reserves and Mineral Resources
MINERAL RESOURCES AND ORE RESERVES SUMMARY 
The following tables detail the Group’s Mineral Resources and Ore Reserves and the changes that have occurred within FY2024. 
There were no material changes to the Group’s Mineral Resources and Ore Reserves.
1	 JORC Code (2012) compliant. Cut-off of grade of 200ppm U3O8 applied to in-situ, with a cut-off grade of 250ppm U3O8 applied to stockpiles.
2	 ASX Announcement “Langer Heinrich Mine Restart Plan Update, Mineral Resource and Ore Reserve Update“ dated 4 November 2021.
3	 JORC Code (2012) compliant.
Uranium Mineral Resources
30 June 2023
30 June 2024
Change
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Mlb 
U3O8
Canada
Measured
Michelin3
17.6
965
37.6
17.6
965
37.6
-
-
Rainbow
0.2
920
0.4
0.2
920
0.4
-
-
Indicated
Gear
0.4
770
0.6
0.4
770
0.6
-
-
Inda
1.2
690
1.8
1.2
690
1.8
-
-
Jacques Lake3
13.0
630
18.0
13.0
630
18.0
-
-
Michelin
20.6
980
44.6
20.6
980
44.6
-
-
Nash
0.7
830
1.2
0.7
830
1.2
-
-
Rainbow
0.8
860
1.4
0.8
860
1.4
-
-
Inferred
Gear
0.3
920
0.6
0.3
920
0.6
-
-
Inda
3.3
670
4.8
3.3
670
4.8
-
-
Jacques Lake3
3.6
550
4.4
3.6
550
4.4
-
-
Michelin3
4.5
985
9.9
4.5
985
9.9
-
-
Nash
0.5
720
0.8
0.5
720
0.8
-
-
Rainbow
0.9
810
1.6
0.9
810
1.6
-
-
Total Canada
67.7
860
127.7
67.7
860
127.7
-
-
Uranium Mineral Resources
30 June 2023
30 June 2024
Change
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Mlb 
U3O8
Namibia
Langer Heinrich1,2
Measured
In-situ
79.1
 450
78.6
79.1
 450
78.6
-
-
MG ROM stockpiles
6.3
510
7.1
5.3
510
6.0
(0.87)
(0.96)
LG ROM stockpiles
20.2
325
14.5
20.1
325
14.4
(0.10)
(0.06)
Total Measured
105.6
430
100.2
104.5
430
99.0
(0.97)
(1.00)
Indicated
In-situ
23.5
375
19.5
23.5
375
19.5
-
-
Inferred
In-situ
11.0
345
8.4
11.0
345
8.4
-
-
Total Namibia
140.1
415
128.1
139.0
415
126.9
(0.97)
(1.00)
Figures may not add due to rounding
PALADIN ENERGY ANNUAL REPORT 2024
30

Ore Reserves and Mineral Resources
4 JORC Code (2012) compliant.
Uranium Mineral Resources
30 June 2023
30 June 2024
Change
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Mlb 
U3O8
Australia
Measured
Valhalla
16.0
820
28.9
16.0
820
28.9
-
-
Indicated
Andersons
1.4
1,450
4.6
1.4
1,450
4.6
-
-
Bikini
5.8
495
6.3
5.8
495
6.3
-
-
Duke Batman
0.5
1,370
1.6
0.5
1,370
1.6
-
-
Odin
8.2
555
10.0
8.2
555
10.0
-
-
Skal
14.3
640
20.2
14.3
640
20.2
-
-
Valhalla
18.6
840
34.5
18.6
840
34.5
-
-
Carley Bore4
5.4
420
5.0
5.4
420
5.0
-
-
Manyingee
8.4
850
15.7
8.4
850
15.7
-
-
Inferred
Andersons
0.1
1,640
0.4
0.1
1,640
0.4
-
-
Bikini
6.7
490
7.3
6.7
490
7.3
-
-
Duke Batman
0.3
1,100
0.7
0.3
1,100
0.7
-
-
Honey Pot
2.6
700
4.0
2.6
700
4.0
-
-
Mirrioola
2.0
560
2.5
2.0
560
2.5
-
-
Odin
5.8
590
7.6
5.8
590
7.6
-
-
Skal
1.4
520
1.6
1.4
520
1.6
-
-
Valhalla
9.1
640
12.8
9.1
640
12.8
-
-
Watta
5.6
400
5.0
5.6
400
5.0
-
-
Warwai
0.4
360
0.3
0.4
360
0.3
-
-
Carley Bore4
17.4
280
10.6
17.4
280
10.6
-
-
Manyingee4
5.4
850
10.2
5.4
850
10.2
-
-
Total Australia
135.4
635
189.8
135.4
635
189.8
-
-
Figures may not add due to rounding
PALADIN ENERGY ANNUAL REPORT 2024
31

Ore Reserves and Mineral Resources
5	 JORC Code (2012) compliant.
6	 ASX Announcement “Langer Heinrich Mine Restart Plan Update, Mineral Resource and Ore Reserve Update“ dated 4 November 2021
Vanadium Mineral Resources
30 June 2023
30 June 2024
Change
Mt
Grade 
ppm 
U3O8
Mlb 
V2O5
Mt
Grade 
ppm 
U3O8
Mlb 
V2O5
Mt
Mlb 
V2O5
Namibia
Langer Heinrich5,6
Measured
In-situ
79.1
145
25.5
79.1
145
25.5
-
-
MG ROM stockpiles
6.3
165
2.3
5.3
165
1.9
(0.87)
(0.31)
LG ROM stockpiles
20.2
105
4.7
20.1
105
4.7
(0.10)
(0.02)
Total Measured
105.6
140
32.5
104.5
140
32.1
(0.97)
(0.32)
Indicated
In-situ
23.5
120
6.3
23.5
120
6.3
-
-
Inferred
In-situ
11.0
115
2.7
11.0
115
2.7
-
-
Total Namibia
140.1
135
41.5
139.0
135
41.1
(0.97)
(0.32)
Uranium Ore Reserves
30 June 2023
30 June 2024
Change
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Grade 
ppm 
U3O8
Mlb 
U3O8
Mt
Mlb 
U3O8
Namibia
Langer Heinrich5,6
Proved
48.3
488
52.0
48.3
488
52.0
-
-
Probable
10.0
464
10.2
10.0
464
10.2
-
-
Stockpiles
26.5
369
21.6
25.4
364
20.4
(0.97)
(1.00)
Total Namibia
84.8
448
83.8
83.8
448
82.8
(0.97)
(1.00)
Figures may not add due to rounding. Ore Reserves reported at a 250ppm U3O8 cut-off grade. Mineral Resources and Ore Reserves quoted on a 100% basis. Mineral Resources are 
reported inclusive of Ore Reserves.
All the Group’s Mineral Resources and Ore Reserves are 
internally peer reviewed at the time of estimation and are 
subject to ongoing review, as and when required. Should any 
Mineral Resources or Ore Reserves be utilised within a Bankable 
or Definitive Feasibility Study, it is expected that an audit by 
independent experts would be conducted.
The information in this Annual Report that relates to Mineral 
Resources is based on, and fairly represents, information and 
supporting documentation compiled by David Princep BSc, 
P.Geo FAusIMM, a Competent Person who has sufficient 
experience that is relevant to the style of mineralisation and 
type of deposit under consideration and to the activity that he 
is undertaking to qualify as a Competent Person as defined 
in the reporting standard JORC 2012. Mr Princep is a full-time 
employee of Gill Lane Consulting Pty Ltd, consults to Paladin 
and is a current Fellow of the Australasian Institute of Mining 
and Metallurgy. Mr Princep consents to the inclusion of this 
information in the form and context in which it appears.
The information in this Annual Report that relates to the 
Ore Reserves estimation for the Langer Heinrich Uranium 
Project is based on, and fairly represents, information and 
supporting documentation compiled by Mr David Varcoe, 
Principal Mining Engineer, for AMC Consultants Pty Ltd. Mr 
Varcoe is an employee of AMC Consultants Pty Ltd and is a 
Competent Person who is a current Fellow of the Australasian 
Institute of Mining and Metallurgy (AusIMM No: 105971). Mr 
Varcoe has sufficient experience that is relevant to the style of 
mineralisation and type of deposit under consideration and to 
the activity being undertaken to qualify as a Competent Person 
as defined in the reporting standard JORC 2012. Mr Varcoe 
consents to the inclusion of this information in the form and 
context in which it appears. 
PALADIN ENERGY ANNUAL REPORT 2024
32

Paladin’s strategy for 
sustainable value creation
PALADIN ENERGY ANNUAL REPORT 2024
33

Environmental, 
Social and 
Governance
PALADIN ENERGY ANNUAL REPORT 2024
34

Environmental, Social and Governance
Our vision
Our vision “Clean Energy. Clear Future.” underscores Paladin’s 
pivotal role in driving the extensive reductions in global 
greenhouse gas emissions essential for establishing a resilient 
low-carbon economy. The uranium we supply is vital for 
producing safe, carbon-free, affordable, and reliable nuclear 
power worldwide. In our pursuit of this vision, we are guided 
by our fundamental values. We are confident that our strategy 
is well-suited to achieve our goals, and we are dedicated to 
addressing the Environmental, Social, and Governance (ESG) 
risks and opportunities that could substantially influence our 
capacity to deliver long-term value to our stakeholders.
Our commitment
Paladin is wholly committed to a best practice, globally 
accredited ESG framework that sets standards of organisational 
behaviour and holds us firmly accountable. At Paladin, ESG is 
core to our business, and we want to be held accountable for 
what we do – not just for what we say. When our performance 
is measured, we expect that outcomes clearly reflect our 
behaviours. 
Paladin’s 2023 Sustainability Report marked an important 
evolution in the Company’s sustainability reporting. In addition 
to reporting under the Sustainability Accounting Standards 
Board (SASB) framework, materiality and status assessments 
of the Global Reporting Initiative (GRI) standards and Climate-
related Financial Disclosures (TCFD) reporting framework were 
undertaken, with a detailed implementation plan for roll-out 
of these frameworks in 2024. Paladin continues to make 
significant progress on its sustainability journey, and the 2024 
Sustainability Report is due to be released in October 2024.
Additionally, Paladin is working towards full compliance with 
the International Finance Corporation (IFC) Performance 
Standards and Good International Industry Practice (GIIP), 
to demonstrate the Company’s commitment to sustainable 
and responsible practices and improve transparency and 
accountability with stakeholders. 
The Sustainability Report sets out Paladin’s strategy and the 
policies and programs used to govern and manage ESG issues 
that are important to our stakeholders. In addition to SASB, 
GRI and TCFD, the report provides key ESG performance 
indicator data to measure and report Paladin’s performance 
on environmental, social and economic impacts in the areas 
that the Company believes has a significant impact on its 
sustainability in the long-term. 
Paladin’s inaugural voluntary Modern Slavery Statement will be 
published at the same time as the 2024 Sustainability Report. 
Our voluntary Modern Slavery Statement will include details of 
the risks of modern slavery in our operations and supply chains, 
as well as actions Paladin has taken to assess and address 
those risks, and the effectiveness of its response towards 
maintaining responsible and transparent supply chains.
PALADIN ENERGY ANNUAL REPORT 2024
35

Environmental, Social and Governance
Going forward into FY2025, we are actively monitoring the development of the Australian Sustainability Reporting Standards and their 
requirements, with the aim of proactively complying with the requirements once the Standards become effective. 
The structured implementation of these three reporting frameworks (SASB, GRI and TCFD) and compliance to IFC Performance 
Standards will increase the level of detail reported over time and will provide a more complete representation of Paladin’s performance 
to all key stakeholders. The focus and audience of the frameworks are provided below:
Combining the complimentary SASB / GRI / TCFD frameworks provides a comprehensive integrated sustainability 
reporting framework
SASB Focus: 
ESG issues expected to have 
financially material impact on 
the company itself (Internal 
Focus) 
Audience:  
Investors and other providers of 
financial capital – Enterprise Value
Metrics:  
SASB Standards reference metrics 
already in use by industry
TCFD Focus: 
Risks related to climate 
change & potential financial 
implications associated with 
transitioning to a lower-carbon 
economy
Audience: 
Investors, other providers of financial 
capital and insurance underwriters – 
Enterprise Value 
GRI Focus: 
External impacts of  
a company’s activities 
(Economic, Environmental, 
Social)
Audience: 
Broad range of external stakeholders, 
including investors. Many companies 
use both SASB and GRI standards to 
meet the needs of their audiences – 
Stakeholder Value
FINANCIAL  
MATERIALITY
IMPACT  
MATERIALITY
CLIMATE-RELATED  
FINANCIAL INFORMATION
IFC Focus: 
Promote sustainable 
development by ensuring 
businesses effectively manage 
environmental and social risks 
and impacts
Audience: 
Broad range of external stakeholders, 
including investors and other 
providers of financial capital – 
Stakeholder Value
IFC PERFORMANCE 
STANDARDS
Financial Reporting & Disclosure Standards
PALADIN ENERGY ANNUAL REPORT 2024
36

Environmental, Social and Governance
Continued  
compliance with 
laws, regulations, 
licence and permit 
conditions
No environmental 
non-compliances  
or breaches
Strong local 
community 
commitment through 
jobs, education and 
procurement
Expanded ESG 
disclosures under 
the integrated 
sustainability 
reporting framework
Conducted 
climate risk and 
opportunities 
assessment for our 
operations
Alignment of 
disclosures with 
SASB, GRI and  
TCFD
Plan roll-out of Australian 
Sustainability Reporting 
Standards compliance 
framework
Further develop 
our Modern Slavery 
assessment, reporting 
and governance
Continue to maintain  
compliance with laws, 
regulations, licence and 
permit conditions
Establish GHG emissions 
and resource intensity 
baseline
Expand climate risk 
and opportunities 
assessment scope to 
include financial impact
FY2024 ESG Highlights and Performance
FY2025 ESG Goals and Metrics
PALADIN ENERGY ANNUAL REPORT 2024
37

Environment 
Paladin protects the environment and works to 
minimise its impacts on it, achieving continuous 
improvements in sustainability practices. Paladin 
is committed to supporting emissions reductions 
to achieve the goals of the 2021 United Nations 
Climate Change Conference (COP26) and the 
accelerated deployment of low-emissions 
technologies called for during the 2023 United 
Nations Climate Change Conference (COP28).
Paladin recognises that excellence in environmental 
performance is essential to business success and to achieving 
its sustainable development objectives. Paladin is committed 
to ensuring our projects are delivered with a keen focus on 
sustainability and reducing our own Scope 1 and Scope 2 carbon 
emissions and environmental impact. Paladin aims to minimise 
its impact on the environment through: 
•	 Effective environmental management across all aspects of 
its portfolio 
•	 Preventing, minimising, mitigating and remediating any 
adverse impacts of its operations on the environment 
•	 Achieving continuous improvement in environmental 
performance. 
Paladin’s environmental approach is managed through its 
Environmental Policy with a suite of underlying policies, and 
management, monitoring and mitigation plans. Our robust 
policies and guidelines focus primarily on water and land 
use management, rehabilitation, mineral waste and reducing 
greenhouse gas (GHG) emissions. The LHM Environmental 
Policy and underlying policies have been reviewed and updated 
as part of the LHM return to production. 
The LHM produces a Bi-Annual Environmental Management 
Progress Report to comply with reporting requirements under 
the LHM Environmental Clearance Certificate (ECC) issued in 
October 2023 in compliance with the mining licence obligations, 
as well as the LHM Environmental Management Plan. The 
bi-annual report is a comprehensive report on environmental 
monitoring of air, water quality, energy, land-use, radiation, 
and biodiversity within the LHM mining licence areas as 
well as surrounding community support, as the LHM carries 
out activities within our framework of legal and regulatory 
requirements. This report is submitted to the Ministry of 
Environment, Tourism and Forestry, the Ministry of Mines and 
Energy and the Ministry of Agriculture, Water and Land Reform. 
Additional environmental monitoring is carried out at the 
LHM for the ESG disclosures that form part of our integrated 
sustainability framework metrics.
Paladin has met all applicable regulatory and other compliance 
obligations and holds all applicable permits and licences across 
the Company’s global operations. 
Moving forward, the LHM aims to establish a baseline of 
the historical carbon footprint and environmental impact by 
reviewing water, fuel and reagents consumption and carbon 
emissions. This is being undertaken to continue our efforts 
to minimise the LHM carbon footprint and improve our 
operation’s future performance. The Restart Project which was 
completed during the year incorporated measures to reduce our 
environmental footprint and impacts, including upgraded tailings 
dewatering, increasing process water return and reducing water 
loss to tailings. Paladin is reviewing the LHM’s consumption 
and emissions data and will set meaningful targets once the 
footprint has been confirmed in operations after the plant has 
achieved steady state production.
Uranium mining and processing are critical components of 
the nuclear fuel cycle as they provide the raw material for 
producing clean, sustainable base-load electricity. With growing 
global demand for electricity, and targets set for reduced CO2 
emissions, nuclear energy will continue to play a key role in the 
decarbonisation of global power generation. 
Coal
gCO2 equivalent per kWh
900
600
300
0
820
Biomass -  
co-firing
740
Biomass
230
Solar PV - 
utility
48
Solar PV - 
roof
41
Geothermal
38
Solar - 
concentrated
27
Hydropower
24
Natural  
gas
490
Nuclear
12
Wind 
offshore
12
Wind 
onshore
11
Average life-cycle carbon dioxide-equivalent emissions
Source: IPCC - Average life-cycle carbon dioxide-equivalent emissions for different electricity generators.
Environmental, Social and Governance
PALADIN ENERGY ANNUAL REPORT 2024
38

Nuclear energy was recognised as a critical component in the 
transition to a low-carbon economy during the 2023 COP28 
meeting in Dubai, where leaders from 22 countries on four 
continents came together to announce a declaration to advance 
a global aspirational goal of tripling global nuclear energy capacity 
by 2050 to meet climate goals and energy needs. The landmark 
declaration invited the World Bank, regional development banks 
and international financial institutions to include nuclear in their 
lending, while underscoring the need for secure supply chains 
to ramp up deployment of the technology. Nuclear power plants 
produce no greenhouse gas emissions during operations, and 
every reduction in CO2 emissions reduces the impacts of climate 
change and global warming. Importantly, uranium is a highly 
efficient fuel source. Lifecycle GHG emissions for different energy 
sources and technologies shows nuclear power to have one of 
the lowest GHG emissions intensity, comparable with solar and 
wind and up to 100 times lower than coal which averages ~1,000 
grams CO2 equivalent/kWh.
The uranium mined and processed at the LHM will be used to 
resource nuclear power plants, helping drive the global energy 
transition to a carbon-free, sustainable future. During peak 
production, the LHM will produce enough uranium fuel annually 
to fully supply over ten 1,000 MWe nuclear power plants. Over 
the life of the LHM, achieving this level of power generation 
through coal-fired electricity would generate an average of  
58 million tonnes of carbon dioxide emissions per annum. This 
equates to a total of around 1.3 billion tonnes carbon dioxide 
emissions that would be generated by the equivalent coal-fired 
electricity, over the projected 17-year life of the LHM. 
Paladin recognises the increasing global impacts of climate 
change, however the financial impact, and any other impacts, 
of climate change on our operations is currently expected to 
be minimal, due to the plant design and location of the LHM. 
Paladin is focused on its role in providing a low-carbon fuel 
source to reduce CO2 emissions as part of the world’s energy 
transformation in order to achieve climate change goals.
Social 
Paladin prioritises the health, safety, and wellbeing 
of our workforce and stakeholders, fostering a 
positive culture that places these values front and 
centre. Embracing diversity and ensuring equal 
opportunities for all, Paladin actively engages 
with local communities, aiming to contribute  
meaningfully to their social prosperity and 
development with unwavering integrity.  
Paladin is dedicated to ensuring a safe, secure, and healthy 
work environment, striving for zero harm from occupational 
injuries and illnesses and instils a culture that views all injuries 
as preventable, actively promoting safety and accountability 
among our employees and contractors.
Excellence in radiation management is integral to Paladin's 
commitment to occupational health and safety. Paladin employs 
a comprehensive array of proactive monitoring measures to 
safeguard occupational health, hygiene, and safety, with a 
particular focus on radiation exposure controls at the LHM. 
Paladin’s radiation protection protocols include strict adherence 
to procedures and the use of calibrated equipment to monitor 
radiation exposure levels for employees, contractors, visitors, 
and specific work areas. Annual results are submitted to 
the Namibian National Radiation Protection Authority for 
assessment, ensuring ongoing compliance and approval for 
operations at the LHM. 
During FY2024, the LHM Restart Project had a significant 
positive impact on the community through employment 
opportunities, local procurement and corporate social 
responsibility initiatives. The number of full-time LHM employees 
has grown tenfold and the Restart Project contractor workforce 
peaked at 1,200. 
In completing the LHM Restart Project, over 2.5 million hours 
were worked with no serious injuries or reportable environmental 
incidents. Since the commencement of operations, the LHM has 
recorded 2 lost-time injuries and achieved a Total Recordable 
Injury Frequency Rate (TRIFR) of 4.4 per million hours worked 
on a rolling 12 month basis. The Company recorded a TRIFR 
of 3.8. We continued to deliver operationally targeted safety 
interventions and training programs, which included risk 
mitigation assessment and measures, employee engagement 
sessions and sharing of industry best practice. Continuous 
improvement of our advanced safety processes was also a 
focus of our activity during the year.
Paladin places a high value on workplace diversity, 
understanding the significant advantages that arise from 
recruiting, developing, and retaining a talented, diverse and 
motivated workforce. Central to our business success is our 
recognition of the critical role our people play, and we are deeply 
committed to supporting their growth while fostering a positive 
culture of employee engagement and inclusivity.
Employees at Paladin benefit from structured and informal 
learning opportunities aimed at continuous skill development 
and expertise enhancement. At the LHM, we actively support 
employee education and career advancement, offering local 
and regional employment opportunities whenever feasible. We 
celebrate our diverse workforce, which includes individuals from 
various age groups, cultural backgrounds, genders, educational 
levels, and professional experiences, leveraging this diversity to 
promote collaboration and maximise collective benefits.
Paladin's dedication to community and social investment 
is deeply rooted in our Company Values. We prioritise our 
local communities, aiming to create a positive impact and 
contribute meaningfully to their well-being and prosperity. 
This commitment is reflected through various initiatives such 
as local hiring practices, community development programs, 
and sourcing from local industries to foster economic growth 
and value in the regions we operate. Engaging with local and 
governmental stakeholders and supporting community causes 
are also integral parts of our approach. With the restart of 
production in March 2024, Paladin remains steadfast in its 
commitment to actively engage with the Namibian community. 
We are committed to being recognised as a responsible 
corporate citizen, dedicated to providing opportunities to the 
local community and ensuring a positive and lasting contribution 
to the community's welfare.
Environmental, Social and Governance
PALADIN ENERGY ANNUAL REPORT 2024
39

CEO
EXECUTIVE COMMITTEE
DELEGATION OF AUTHORITY
Governance 
Paladin operates with the highest ethical standards 
and integrity, ensuring full compliance with all 
relevant laws and regulations while prioritising 
transparency and accountability. Paladin’s corporate 
governance practices are constructed to uphold  
our commitments to stakeholders, as we believe 
that strong governance is essential for sustainable  
long-term performance and value creation for all. 
The Board of Directors has the ultimate responsibility and 
accountability for our sustainability strategy, priorities and 
performance. Additionally, the Board is responsible for formally 
reviewing and approving our Sustainability Report. 
The Board is supported by the following committees:
•	 Audit & Risk Committee 
•	 Technical & Sustainability Committee 
•	 Governance, Remuneration & Nomination Committee  
The Board is structured to ensure that the skills and experience of 
its directors align with our goals and strategic direction. The roles 
and responsibilities of the Board and each committee are detailed 
in their respective charters, which, along with information about 
Board members, are available in the ‘Directors' Report’ section of 
the Annual Report and on our website. 
Paladin understands the advantages that diversity brings to 
our Board of Directors. A varied combination of skills, expertise, 
experiences, perspectives, ages, and traits fosters diversity of 
thought, enhancing our ability to consider opportunities, issues, 
and risks, which ultimately leads to better decision-making 
outcomes. As at 30 June 2024, the Paladin Board has seven 
members, all independent Non-Executive Directors (57% male 
and 43% female).
The Paladin Board of Directors has a clear understanding 
that it is responsible for Paladin’s corporate governance. 
The Board recognises the importance of our corporate 
governance framework in establishing accountabilities, guiding 
and regulating activities, monitoring and managing risks and 
optimising Paladin’s performance. Governance is a core function 
at the heart of the Company’s sustainability efforts. The Board 
also recognises the need to regularly review its system of 
corporate governance as best practice evolves.
Our current Paladin Corporate Governance Framework 
(Governance Framework) depicted in the diagram below uses as 
a reference the Fourth Edition Corporate Governance, Principles 
and Recommendations of the ASX Corporate Governance Council 
(ASX Principles). The Board regularly reviews its Governance 
Framework in order to align with good corporate governance 
practices, changes in law and changes to Paladin's business 
operations. As per Recommendation 7.4 of the ASX Principles, the 
2024 Sustainability Report will provide detailed information on the 
management of Paladin’s material environmental and social risks, 
with a specific focus on climate risks, in alignment with the TCFD. 
Our corporate governance practices for the year ended 30 June 
2024 are outlined in our 2024 Corporate Governance Statement.  
BOARD OF DIRECTORS
BOARD COMMITTEES
SHAREHOLDERS
COMMUNITY
EMPLOYEES
CUSTOMERS &
SUPPLIERS
GOVERNMENT &
REGULATORS
GOVERNANCE, REMUNERATION & 
NOMINATION COMMITTEE
TECHNICAL &
SUSTAINABILITY COMMITTEE
AUDIT & RISK
COMMITTEE
RISK MANAGEMENT & 
INTERNAL CONTROL SYSTEM
POLICIES & PROCEDURES
CORPORATE  
CULTURE & VALUES
STAKEHOLDERS
Environmental, Social and Governance
PALADIN ENERGY ANNUAL REPORT 2024
40

While what we achieve is important, the way we achieve it is 
equally crucial. Consistent ethical behaviour fosters loyalty and trust 
among our stakeholders and within our team. We are committed 
to these values, which guide our decision-making. Our Code of 
Business Conduct and Ethics (Code of Conduct) sets the standard 
for our commitment to integrity and respect, providing practical 
guidance for our daily work. Compliance with the Code of Conduct 
is mandatory for everyone at Paladin, and it is accessible to all 
employees and external stakeholders on our website. We deliver 
annual mandatory training to ensure everyone understands the 
Code of Conduct and the acceptable standards of behaviour 
at Paladin. We have zero tolerance for any form of unlawful 
discrimination, bullying, or harassment.
Integrity, one of our core values, is reinforced by the Code of 
Conduct which requires all officers, employees, and Board members 
to uphold the highest standards of business and personal ethics. 
Paladin is committed to complying with all applicable laws and 
regulations in the countries where we operate, conducting business 
with the utmost ethical standards and absolute integrity. Our 
compliance framework, which includes legislative requirements, 
government policies, and internal policies, ensures our high standards 
are integrated into all global business practices. We maintain zero 
tolerance for corruption and bribery, supported by our Anti-Bribery 
and Corruption Policy and Whistleblower Policy, which provide 
practical advice on ethical conduct and facilitate the disclosure of any 
alleged corruption. 
The Board is responsible for satisfying itself that management has 
developed and implemented a sound system of risk management 
and internal control. The Audit & Risk Committee (ARC) is mandated 
to provide oversight of the Risk Management Framework. The ARC’s 
role is to provide assurance to the Board that risk is being managed 
effectively across the Company. Management is responsible for 
designing, implementing, reviewing and providing assurance as to 
the effectiveness of the Risk Management Policy. Every employee 
of Paladin is responsible for managing risks on a day-to-day basis by 
adhering to Paladin’s risk management policies and internal control 
systems. 
Paladin recognises that the identification and effective management 
of risk, including prudent, informed risk taking, is an essential part of 
Paladin’s aim of creating long-term shareholder value. Paladin’s Risk 
Management Policy aims to integrate risk management into Paladin’s 
strategy and business and undertake activities in line with Paladin’s 
Risk Appetite as defined by the Board. The Risk Management Policy 
is the overarching document that provides the foundation which 
supports the framework and processes for the integration of risk 
management into the Company’s business activities. Cybersecurity 
risks are incorporated into Paladin’s risk management framework and 
managed accordingly. Paladin has an established IT Policy which has 
been updated with the return of the LHM to production.
Paladin’s Board recognises the risks posed by climate change, 
economic, environmental and social factors and is committed to being 
an active partner in addressing these risks. Paladin is committed to the 
core principle of delivering value through sustainable development and 
aims to promote sustainable business practices by integrating climate-
related, economic, environmental and social risks and opportunities 
into our governance, strategy and risk management process. 
As a forward-looking company committed to sustainability and with 
full support from the Board, in FY2024 Paladin embarked on the 
pathway towards TCFD compliance to address the challenges and 
opportunities presented by the transition to a low-carbon economy. 
During the period, Paladin conducted a sustainability materiality 
assessment and a thorough cross-business assessment of our 
current climate-related risks and opportunities. In FY2025, with the 
use of data on our greenhouse gas emissions, energy usage, and 
other relevant environmental metrics, Paladin intends to further 
expand the climate risk and opportunities assessment to achieve a 
comprehensive understanding of our environmental footprint and its 
financial implications.
Following the TCFD recommendations and recognising that 
the future is uncertain, we aim to develop multiple scenarios to 
understand how different pathways toward a low-carbon economy 
could impact our business. These scenarios will include factors such 
as regulatory changes, market shifts, technological advancements, 
and physical climate impacts. By examining both short-term and 
long-term horizons, we will be able to identify potential risks and 
opportunities under various low-carbon transition scenarios.
Communication to and training of our workforce are essential as we 
integrate our findings into the Company's strategic planning. We 
conduct workshops and training sessions to ensure that Paladin 
understands the significance of TCFD compliance and their role in 
the process. This internal education helps embed climate-related 
considerations into our decision-making processes, from investment 
planning to operational adjustments.
To enhance transparency and accountability, the conclusion of the 
quantitative climate risk and opportunities assessment and scenario 
planning analysis will allow us to develop robust metrics and targets 
aligned with our climate-related goals. These include specific, 
measurable objectives for reducing our carbon footprint, increasing 
energy efficiency, and adopting renewable energy sources. We view 
the alignment process to TCFD recommendations as an opportunity 
to strengthen our resilience against climate-related risks and position 
ourselves as a leader in the transition to a sustainable, low-carbon 
future.
The integrated sustainability reporting framework of SASB, GRI and 
TCFD will help investors and other stakeholders understand how 
we integrate the external impact of the Company’s activities, and 
the climate-related, economic, environmental and social risks and 
opportunities into our governance, strategy, and risk management 
process. 
The term ‘modern slavery’ refers to various forms of exploitation that 
constitute slavery or slavery-like practices. The Modern Slavery Act 
2018 (Cth) aims to address and combat these practices by requiring 
businesses to disclose information regarding their efforts to ensure 
that their operations and supply chains are free of modern slavery, 
enhancing law enforcement capabilities and providing support for 
victims.
Paladin condemns all forms of modern slavery and is dedicated to 
preventing forced and child labour within our supply chain operations, 
as emphasised in our Code of Conduct. Paladin’s first voluntary 
Modern Slavery Statement is being issued for FY2024 with the aim 
of demonstrating our commitment to ethical practices and corporate 
responsibility. We are committed to the eradication of modern 
slavery demonstrating a transparent and accountable approach to 
our business practices and reflecting our commitment to continuous 
improvement and high ethical standards. It is an ongoing process, 
and we aim to constantly refine our practices and policies to better 
address and prevent modern slavery.
Environmental, Social and Governance
PALADIN ENERGY ANNUAL REPORT 2024
41

Corporate 
Governance
Statement
PALADIN ENERGY ANNUAL REPORT 2024
42

Governance Framework
The Board of Directors of Paladin Energy Ltd recognises 
the importance of its corporate governance framework in 
establishing accountabilities, guiding and regulating activities, 
monitoring and managing risks and optimising Paladin’s 
performance. The Board regularly reviews its corporate 
governance framework in order to align with good corporate 
governance practices, changes in law and changes to Paladin’s 
business operations. Paladin, as a listed entity, must comply 
with the Corporations Act 2001 (Cth), Australian Securities 
Exchange Listing Rules (ASX LR) and other Australian and 
international laws. The Board and management regularly review 
the corporate governance policies as appropriate to reflect the 
growth of the Company, current legislation and best practice. 
Paladin’s website www.paladinenergy.com.au includes copies 
of key corporate governance policy documents. The website 
also contains copies of all Board and Committee Charters. 
Paladin’s Corporate Governance Statement dated 30 June 2024 
and approved by the Board on 27 August 2024, outlines the 
key corporate governance principles and practices during the 
FY2024 reporting period. The governance policies and practices 
adopted by the Company during the reporting period follow the 
recommendations contained in the ASX Principles. 
Paladin’s Corporate Governance Statement can be found 
in the Corporate Governance section of its website at  
www.paladinenergy.com.au, together with the ASX Appendix 
4G, a checklist cross-referencing the ASX Principles to 
disclosures in this statement and the current Annual Financial 
Report. The Corporate Governance Statement, together with 
the Appendix 4G, has been lodged with the ASX.
Corporate Governance Statement
Visit our website to read more: 
paladinenergy.com.au/corporate/corporate-governance
Corporate Governance Statement 2024
RESOURCING A GLOBAL 
CARBON-FREE FUTURE
PALADIN ENERGY ANNUAL REPORT 2024
43

Directors’
Report
PALADIN ENERGY ANNUAL REPORT 2024
44

Directors’ Report
The Directors of Paladin Energy Ltd present their report 
together with the financial report of the Group consisting 
of Paladin Energy Ltd (Company) and the entities (Group) it 
controlled at the end of, or during, the year ended 30 June 2024 
and the auditor’s report. There were no changes to the Board of 
Directors during the financial year.
DIRECTORS
The following persons were independent Non-Executive Directors 
of Paladin Energy Ltd and were in office during the financial year:
Mr Cliff Lawrenson
Non-Executive Chair
B.Com (Hons), FGIA
Mr Peter Main
Non-Executive Director
BBus
Mr Peter Watson
Non-Executive Director
BEng (Hons), FIEAust, GAICD, RPEQ
1	 In FY2022, Mr Peter Watson was requested by the Board to provide additional oversight to the Langer Heinrich Mine Restart Project. This arrangement will continue until  
31 August 2024.
Mr Cliff Lawrenson was appointed  
Non-Executive Chair in October 2019.
Mr Lawrenson is an experienced Non-
Executive Director having served on or 
chaired public and private companies for 
over 15 years after a successful career in 
executive leadership, including in investment 
banking. Mr Lawrenson holds postgraduate 
qualifications in commerce and finance and 
has worked extensively in the resources and 
energy sectors across the world. He has a 
successful track record of leading strategic 
direction in companies and executing complex 
corporate transactions.
Current listed company Directorships:
Non-Executive Chair of Australian Vanadium 
Limited (ASX:AVL).
Former listed company Directorships  
(last three years):
Atlas Iron Limited, Canyon Resources Limited 
and Caspin Resources Limited.
Mr Peter Main was appointed Non-Executive 
Director in December 2019.
Mr Main is a mining and finance professional 
with extensive experience spanning more 
than 35 years. During that time, Mr Main has 
developed an extensive working knowledge 
in financial markets centred around the 
mining sector, developing a wealth of industry 
experience. 
During his career Mr Main spent 13 years 
in a variety of roles in the mining industry 
through to CEO in the later years of a TSX-V 
listed mining company. He spent more than 
20 years in mining finance, more recently 
advising and managing the development of 
gold enterprises in the Northern Territory and 
Queensland. Mr Main primarily worked for 
investment banks, including 11 years managing 
the Royal Bank of Canada's (RBC) Australian 
equity sales and trading business and co-
managing RBC's regional business, and six 
years at Hartley Poynton as a mining analyst. 
Before that, he spent nine years in full time 
service in the Australian Army. 
Special Responsibilities: 
•	Member of Technical & Sustainability 
Committee 
•	Member of Governance, Remuneration & 
Nomination Committee
Current listed company Directorships: 
None
Former listed company Directorships  
(last three years): 
Carbine Resources Limited
Mr Peter Watson was appointed  
Non-Executive Director in December 2019.
Mr Watson is a chemical engineer with more 
than 35 years’ experience in the global 
resources sector across senior technical, 
project, and management roles as well 
as corporate experience in running ASX 
listed companies. His experience includes 
project development, project delivery, asset 
optimisation and mining facilities operations 
across multiple commodities and global 
jurisdictions, including Africa. 
Mr Watson has held technical and senior 
executive roles with a number of companies, 
culminating in his appointment as the 
Managing Director and CEO of Sedgman 
Limited. Mr Watson has also held a number 
of senior and directorship roles at Strandline 
Resources Ltd, New Century Resources, 
Resource Generation and EvacGroup (private), 
bringing significant board level experience at 
both the public and wholly owned company 
level, particularly on matters covering project 
development and delivery, operations re-start, 
safety, governance, financial reporting, risk 
management, strategy and leadership. 
Special Responsibilities: 
•	Chair of Project Steering Committee1
•	Chair of Technical & Sustainability Committee 
•	Member of Audit & Risk Committee 
Current listed company Directorships: 
Non-Executive Director of Australian Vanadium 
Limited (ASX:AVL). 
Former listed company Directorships  
(last three years):
Evacuation Services Australia Pty Ltd, New 
Century Resources Limited and Strandline 
Resources Ltd.
PALADIN ENERGY ANNUAL REPORT 2024
45

Ms Melissa Holzberger
Non-Executive Director
LLM Resources Law (Distinction) (Scotland),  
Dip. International Nuclear Law (Hons) (France),  
LLB (Adel), BA (Adel), GDLP, FGIA, GAICD
Ms Joanne Palmer
Non-Executive Director
FCA (ICAEW), FCA (CAANZ), GAICD,  
BSc Mathematics & Statistics (Hons)
Dr Jon Hronsky OAM
Non-Executive Director
BAppSci, PhD
Ms Melissa Holzberger was appointed  
Non-Executive Director in May 2021.1
Ms Holzberger is a mining lawyer with over 20 
years of experience in the international energy 
and resources sectors. She is an experienced 
independent company director having served 
on ASX-listed, private, government and 
not-for-profit boards spanning a wide range 
of highly regulated sectors. Ms Holzberger 
brings specialist uranium and nuclear law, 
risk, compliance and corporate governance 
expertise, together with valuable experience 
in uranium mining operations and projects, 
international uranium trade, logistics, product 
stewardship and sustainability having 
previously worked with BHP, Rio Tinto and 
as a trusted adviser to multinational and 
Australian companies. 
Ms Holzberger was awarded the Telstra 
Young Businesswoman of the Year (SA) in 
2006 which recognised her leadership in the 
energy, resources and business community.
Ms Holzberger is a member of the Federal 
Government’s Australian Radiation Protection 
and Nuclear Safety Agency’s Radiation Health 
and Safety Advisory Council. 
Special Responsibilities: 
•	Member of Audit & Risk Committee 
•	Member of Governance, Remuneration & 
Nomination Committee  
Current listed company Directorships:
Non-Executive Director of Argo Investments 
Ltd (ASX:ARG) and Non-Executive Director of 
Karoon Energy Ltd (ASX:KAR).
Former listed company Directorships  
(last three years): 
Silex Systems Ltd and Andromeda Metals Ltd.
Ms Joanne Palmer was appointed  
Non-Executive Director in May 2021.
Ms Palmer, is a former Registered Company 
Auditor, and an existing Fellow of Chartered 
Accountants in Australia and in England and 
Wales. Ms Palmer brings over 27 years of 
industry experience in providing audit and 
assurance services on company listings, 
mergers, acquisitions and takeovers and 
significant experience in auditing international 
mining companies, particularly in Africa. 
Ms Palmer has had an extensive financial 
services career including leading Ernst 
and Young’s Financial Accounting 
Advisory Services team in Perth, working 
predominantly in the mining sector assisting 
both multinational companies, mid-caps and 
junior explorers with technical accounting, 
regulatory advice and finance function 
support services. 
Special Responsibilities: 
•	Chair of Audit & Risk Committee 
•	Member of Governance, Remuneration & 
Nomination Committee 
Current listed company Directorships: 
Non-Executive Director of St Barbara Limited 
(ASX:SBM) and Non-Executive Director of 
Karoon Energy Ltd (ASX:KAR).
Former listed company Directorships  
(last three years): 
Non-Executive Director of Sierra Rutile 
Holdings Limited.
Dr Jon Hronsky was appointed Non-Executive 
Director in March 2023.
Dr Hronsky has more than 40 years of 
experience in the global mineral exploration 
industry, primarily focused on project 
generation, technical innovation and 
exploration strategy development. He has 
worked across a diverse range of commodities 
and geographies. His targeting work led to 
the discovery of the West Musgrave nickel 
sulfide province in Western Australia. His 
experience includes leadership roles in both 
major mining and junior mining companies, 
and he has consulted globally for the last 16 
years. In January 2019 he was awarded the 
Order of Australia Medal for services to the 
mining industry.
Dr Hronsky is one of the Principals at 
Western Mining Services, a global geological 
consultancy, a partner in Ibaera Capital, (a 
mining focused boutique PE fund) and also an 
Adjunct Professor at the Centre for Exploration 
Targeting at UWA. Jon was previously 
Manager-Strategy & Generative Services for 
BHP Billiton Mineral Exploration and was Global 
Geoscience Leader for WMC Resources Ltd.
Special Responsibilities: 
•	Member of Audit & Risk Committee 
•	Member of Technical & Sustainability 
Committee
Current listed company Directorships:
Non-Executive Director of Encounter 
Resources (ASX:ENR), Non-Executive Director 
of Caspin Resources Limited (ASX:CPN) and 
Non-Executive Director of Strickland Metals 
Limited (ASX:STK)2.
Former listed company Directorships  
(last three years): 
Cassini Resources Limited and Azumah 
Resources Limited.
Directors’ Report
1	 Ms Holzberger resigned as Non-Executive Director effective 23 August 2024.
2	 Effective 1 July 2024.
PALADIN ENERGY ANNUAL REPORT 2024
46

Mrs Lesley Adams
Non-Executive Director
GAICD, CIPD
Mr Ian Purdy
Chief Executive Officer
BCom, FCA, FAICD
Mr Jeremy Ryan
General Counsel & Company Secretary
LPAB GDLP
Mrs Lesley Adams was appointed  
Non-Executive Director in May 2023.
Mrs Adams has more than 30 years of 
experience within the global resources 
industry across multiple roles including 
human resources, health and safety, joint 
venture management and Indigenous and 
corporate affairs. Mrs Adams’ experience 
includes leadership roles in global technology, 
engineering services and major resource 
companies. 
Previously, Mrs Adams was Executive 
General Manager of Roy Hill where she was 
responsible for implementing and supporting 
structural change as the organisation 
transitioned to a sustainable operating 
environment. Mrs Adams’ other senior roles 
include Group Executive HR/Continuous 
Improvement at Beach Energy, Group 
Executive Corporate Services at Quadrant 
Energy and General Manager of Human 
Resources for Santos Limited. Mrs Adams 
is a Graduate of the Australian Institute of 
Company Directors. 
Special Responsibilities: 
•	Chair of Governance, Remuneration & 
Nomination Committee  
•	Member of Technical & Sustainability 
Committee 
Current listed company Directorships: 
None.
Former listed company Directorships  
(last three years):  
None.
Mr Ian Purdy joined Paladin in February 2020.
Mr Purdy is a highly-respected executive with 
more than three decades’ experience within 
Australian and international natural resources 
companies. In his time as a CEO and CFO 
of listed and private companies, Mr Purdy 
has delivered significant shareholder value 
through managing and optimising operations, 
delivering large projects and executing on 
business improvements and asset sales. He 
also has extensive capital markets experience 
and a proven track record of delivering 
company funding requirements. 
Mr Purdy was previously the CFO of Quadrant 
Energy, Managing Director and CEO of 
Mirabela Nickel Limited, Managing Director of 
Norilsk Nickel Australia, Director of Finance 
and Strategy of LionOre Australia, and has 
held senior finance and commercial roles at 
North Limited and WMC Limited.
Mr Jeremy Ryan was appointed Company 
Secretary of Paladin in August 2021.
Mr Ryan has extensive experience in 
corporate governance and was previously 
Company Secretary/ Manager Legal for ASX 
listed gold miner Saracen Mineral Holdings 
Limited (Saracen). Mr Ryan has a proven 
track record of providing legal advice and 
assistance in the resources sector including 
in relation to corporate governance, M&A, 
capital raisings, debt facilities, contracts and 
dispute resolution.
Mr Ryan was admitted to the Supreme 
Court of New South Wales in 1999 and to 
the Supreme Court of Western Australia in 
2001. Prior to his in-house role with Saracen, 
he advised government departments and 
worked in the finance and projects team of 
a large international law firm. During his time 
in private practice, Mr Ryan provided advice 
to companies in the energy and resources 
sectors across a broad range of matters.
PALADIN ENERGY ANNUAL REPORT 2024
47

Directors’ Report
BOARD AND COMMITTEE MEETINGS 
The number of Directors’ meetings and meetings of committees held during the financial year, and the number of meetings attended 
by each Director in the period they held office were:
PRINCIPAL ACTIVITY
The principal activity of the Group was the development and 
operation of the Langer Heinrich Mine (LHM) in Namibia, 
together with exploration and evaluation activities in Australia 
and Canada.
REVIEW AND RESULTS OF OPERATIONS
A detailed operational and financial review of the Group is set 
out on pages 12 to 27 of this report under the section entitled 
Operating and Financial Review.
The Group’s profit after tax from continuing operations for the 
year is US$60M (2023: loss after tax US$27M) representing an 
increase of 322% from the previous year.
DIVIDENDS
No dividend has been paid during the financial year and no 
dividend is recommended for the current year.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
Significant changes in the state of affairs of the Group during 
the financial year were as follows:
•	 The Langer Heinrich Mine Restart Project was completed on 
time and within cost forecast, with total project expenditure 
of US$119.7M
•	 Following the achievement of commercial production at 
the LHM on 30 March 2024, production ramped up with 
517,597lb of drummed U3O8 produced to date. The first 
customer shipment, containing 319,229lb U3O8, departed 
Walvis Bay, Namibia on 12 July 2024
•	 Paladin executed a US$150M Syndicated Debt Facility to 
provide capital flexibility as the Company recommenced 
operations at the LHM. As at 30 June 2024 US$70M had 
been drawn down
•	 Paladin’s shareholders approved consolidation of the 
Company’s issued capital on a ten for one basis on  
9 April 2024
•	 Paladin's interest in the Michelin Project increased from 
75% to 100% through its subsidiary Aurora Energy Limited 
(Aurora). As a result of the funding and dilution provisions of 
the Joint Venture Agreement the Michelin Nominees have 
surrendered their 25% participating interest in the Michelin 
Joint Venture to Aurora 
•	 On 24 June 2024, Paladin and Fission Uranium Corp. 
(Fission) announced they had entered into a definitive 
agreement, pursuant to which Paladin will acquire 100%  
of the issued and outstanding shares of Fission
•	 Paladin’s 2023 Sustainability Report was published on  
17 October 2023, confirming the Company’s commitment  
to delivering value through sustainable development.
Board of
Directors
Audit & Risk
 Committee
Technical & 
Sustainability 
Committee
Governance, 
Remuneration & 
Nomination Committee
Number 
attended
Number 
eligible 
to attend
Number 
attended
Number 
eligible 
to attend
Number 
attended
Number 
eligible 
to attend
Number 
attended
Number 
eligible 
to attend
Name
Mr Cliff Lawrenson
8
8
-
-
-
-
-
-
Mr Peter Watson
 7
8
2
3
3
3
-
-
Mr Peter Main
 8
8
-
-
2
3
2
2
Ms Melissa Holzberger 
 8
8
3
3
-
-
2
2
Ms Joanne Palmer
 8
8
3
3
-
-
2
2
Dr Jon Hronsky OAM
 6
8
2
3
3
3
-
-
Mrs Lesley Adams
 8
8
-
-
3
3
2
2
PALADIN ENERGY ANNUAL REPORT 2024
48

Directors’ Report
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
Other than disclosed below, since the end of the financial 
year, the Directors are not aware of any other matter or 
circumstance not otherwise dealt with in this report, that has 
significantly or may significantly affect the operations of the 
Group, the results of those operations or the state of affairs 
of the Group in subsequent periods with the exception of 
the following, the financial effects of which have not been 
provided for in the 30 June 2024 Financial Report:
•	 On 24 June 2024 Paladin announced it had entered into a 
definitive arrangement agreement, pursuant to which Paladin 
will acquire 100% of the issued and outstanding shares of 
Fission Uranium Corp. (Fission) by way of a court approved 
plan of arrangement (the Transaction) under the Canada 
Business Corporation Act. At the publication date, Fission 
has announced a postponement of the Special Meeting of 
Securityholders to 9 September 2024. Fission advised that 
based on a preliminary assessment of votes received by 
Fission’s proxy solicitor, the majority of the votes received 
to date are in favour, but are not sufficient to approve the 
Transaction as nearly half of eligible shareholders have yet 
to submit their proxies. The postponement of the Meeting is 
intended to provide additional time for all Securityholders to 
have the opportunity to make their voices heard.
•	 Ms Melissa Holzberger resigned as Non-Executive Director 
effective 23 August 2024.
LIKELY DEVELOPMENTS
Likely developments in the operations of the Group are set out 
under the section entitled Operating and Financial Review on 
pages 12 to 27.
ENVIRONMENTAL REGULATIONS
The Group is exposed to environmental risks as outlined under 
the section entitled Operating and Financial Review on pages 
12 to 27 The Group is subject to environmental regulation 
in respect to its exploration, evaluation, development and 
operational activities for uranium projects under the laws of 
the countries in which its activities are conducted. The Group 
currently has a mining and processing operation in Namibia, as 
well as exploration projects in Australia and Canada. The Group 
monitors compliance with all applicable environmental laws 
and regulations in the countries in which it conducts business.
Specific environmental regulations, approvals and licences 
for the exploration, development and operation are required 
to conduct the activities at each site. In addition, many other 
international and industry standards are also applied to the 
Group’s activities, including those specified for the global 
uranium industry. These environmental laws, regulations and 
standards relate to environmental factors such as radiation, 
water, flora, fauna, air quality, noise, waste management and 
pollution control.
The Directors are not aware of any environmental matters 
which would have a significant adverse effect on the Group.
DIRECTORS’ INDEMNITIES
During the year Paladin has incurred premiums to insure the 
Directors and/or Officers for liabilities that may be incurred in 
defending civil or criminal proceedings that may be brought 
against the officers in their capacity as officers of Paladin and/ 
or its controlled entities. Under the terms and conditions of the 
insurance contract, the nature of liabilities insured against, and 
the premium paid, cannot be disclosed.
INDEMNIFICATION OF AUDITORS
To the extent permitted by law, Paladin has agreed to 
indemnify its auditors, PricewaterhouseCoopers, as part of 
the terms of its audit engagement agreement against claims 
by third parties arising from any breach of the agreement by 
Paladin (for an unspecified amount). The Directors of Paladin 
Energy have not provided PricewaterhouseCoopers with 
any indemnities. No payment has been made to indemnify 
PricewaterhouseCoopers during or since the financial year.
ROUNDING
The amounts contained in this report, the Financial Report and 
the Operating and Financial Review have been rounded to the 
nearest US$1,000 (where rounding is applicable) under the 
option available to Paladin under ASIC Corporations (Rounding 
in Financial/Directors’ Reports) Instrument 2016/191. Paladin is 
an entity to which the Instrument applies.
PALADIN ENERGY ANNUAL REPORT 2024
49

Directors’ Report
TOTAL PERFORMANCE RIGHTS 
Issued unlisted employee Performance Rights outstanding to employees of the Company are as follows:
Date granted
End Performance Period
Fair Value1
A$
Exercise price2
A$
Number1
3 November 20213
30 June 2024
$7.05
$0.00
243,117
3 November 20214
30 June 2024
$7.66
$0.00
243,118
1 July 20225
1 July 2024
$5.80
$0.00
22,500
28 September 20225
1 July 2024
$7.55
$0.00
90,000
28 September 20226
30 June 2025
$6.31
$0.00
174,900
28 September 20227
30 June 2025
$6.29
$0.00
174,901
8 November 20225
1 July 2024
$8.25
$0.00
8,250
28 March 20236
30 June 2025
$4.84
$0.00
27,120
28 March 20237
30 June 2025
$4.12
$0.00
27,121
1 February 20235
1 February 2025
$6.05
$0.00
50,000
17 October 20238
1 July 2026
$7.76
$0.00
257,164
17 October 20239
1 July 2026
$7.56
$0.00
257,164
4 December 20235
1 July 2024
$7.76
$0.00
12,500
4 December 20235
1 July 2025
$7.56
$0.00
32,500
28 February 20245
1 July 2024
$11.80
$0.00
12,500
28 February 20245
1 July 2025
$11.80
$0.00
12,500
28 February 20248
1 July 2026
$12.21
$0.00
47,332
28 February 20249
1 July 2026
$10.26
$0.00
47,333
Total
1,740,020
During the year 429,715 Performance Rights were converted to 429,715 shares.
1	 In FY2024, the company undertook a consolidation of its issued capital on the basis that every 10 shares be consolidated into 1 share.
2	 These PRs have been issued for nil cash consideration and no consideration is payable by the holder upon the vesting of a Performance Rights.
3	 Issued under FY2022 LTIP, subject to the Total Shareholder Return (TSR) of the Company over the Performance Period of three years, relative to the TSR performance of a nominated 
general mining peer group of 30 ASX listed companies in the ASX300 Resources Index (ex ASX100).
4	 Issued under FY2022 LTIP, subject to the TSR of the Company over the Performance Period of three years, relative to the TSR performance of a nominated peer group of 15 
international uranium focused companies. 
5	 Commencement Rights issued with no consideration payable.
6	 Issued under FY2023 LTIP, subject to the TSR of the Company over the Performance Period of three years, relative to the TSR performance of a nominated peer group of 14 
international uranium focused companies.
7	 Issued under FY2023 LTIP, subject to the TSR of the Company relative to the TSR performance of a nominated general mining peer group of 25 ASX listed companies in the ASX300.
8	 Issued under FY2024 LTIP, subject to TSR of the Company relative to the TSR performance of the 25 companies the ASX 200 index (excluding ASX 50) and classed under the Energy 
sector or Metals & Mining Industry, excluding companies operating in Oil & Gas.
9	 Issued under FY2024 LTIP, subject to the TSR of the Company relative to the TSR performance of a custom peer group inclusive of globally listed companies operating in the uranium 
extraction sector.
PALADIN ENERGY ANNUAL REPORT 2024
50

Directors’ Report
TOTAL SHARE APPRECIATION RIGHTS 
The outstanding balance of Share Appreciation Rights at the date of this report is as follows:
Date granted
Vesting date
Expiry date
Fair Value1
A$
Exercise price2
A$
Number1
27 September 2016
11 November 2019
11 November 2024
$0.843
$2.00
1,800
16 April 2018
16 April 2020
16 April 2025
$0.676
$1.50
1,250
1 July 2019
1 July 2020
1 July 2025
$0.49
$1.226
70,000
1 July 2019
1 July 2021
1 July 2026
$0.638
$1.226
70,000
1 July 2019
1 July 2022
1 July 2027
$0.744
$1.226
110,000
1 October 2019
1 October 2020
1 October 2025
$0.297
$1.20
2,000
1 October 2019
1 October 2021
1 October 2026
$0.439
$1.20
4,000
1 October 2019
1 October 2022
1 October 2027
$0.537
$1.20
4,000
Total
263,050
During the year 24,800 Share Appreciation Rights were converted to 21,255 shares. 
AUDITOR
PricewaterhouseCoopers were appointed auditors for Paladin by shareholders at the 2016 Annual General Meeting on 18 November 2016.
NON-AUDIT SERVICES
During the year, non-audit and assurance services were provided by Paladin’s auditor, PricewaterhouseCoopers. The Directors 
are satisfied that the provision of non-audit and assurance services is compatible with the general standard of independence for 
auditors imposed by the Corporations Act. The nature and scope of each type of non-audit and assurance service provided means 
that auditor independence was not compromised.
Details of amounts paid or payable to PricewaterhouseCoopers can be found in Note 27.
LEAD AUDITOR’S INDEPENDENCE DECLARATION
The Lead Auditor’s Independence Declaration is set out on page 82 of the Financial Report.
Dated this 29th day of August 2024.
Signed in accordance with a resolution of the Directors.
Cliff Lawrenson
Chair
Perth, Western Australia
1	 In FY2024, the Company undertook a consolidation of its issued capital on the basis that every 10 shares be consolidated into 1 share.
PALADIN ENERGY ANNUAL REPORT 2024
51

Remuneration
Report
PALADIN ENERGY ANNUAL REPORT 2024
52

Remuneration Report
Message from the Chair of the Governance, Remuneration and Nomination Committee 
As the Chair of the Company’s Governance, Remuneration, 
and Nomination Committee (the Committee), I am proud to 
present the Paladin Remuneration Report for the 2024 financial 
year (FY2024). This year marks a significant milestone in our 
journey, marked by transformative achievements and strategic 
advancements, underscoring our dedication to excellence and 
sustainable growth.
In FY2024, Paladin established a robust foundation for growth 
and profitability. Notably, our achievement of commencing first 
production at the Langer Heinrich Mine (LHM) safely and within 
budget is a testament to our expertise and operational excellence. 
Strategically, we secured debt funding to provide financial flexibility, 
effectively mitigating liquidity risks and ensuring uninterrupted 
progress during the ramp-up of operations.
We are committed to engaging positively with the local 
communities in which we operate and continue to foster an 
inclusive culture that harnesses the strength of our employee’s 
diverse backgrounds and expertise. Our exceptional workforce 
and management team have been instrumental in navigating 
industry complexities. Together, we have excelled in critical areas 
of our FY2024 strategy, including health and safety, balance 
sheet flexibility and business performance, to support the global 
energy transition to a carbon-free sustainable future.
Our Performance
As we reflect on our Company's performance over the past year, 
it is important to acknowledge our outstanding achievement on 
the LHM Restart Project (Restart Project). The Restart Project 
was completed on time and within cost forecast, with total 
project expenditure of US$119.7M, and operational readiness 
costs of US$21.1M, lower than the overall budget of US$147M. 
In the dynamic landscape of the mining industry, projects 
often encounter unforeseen challenges and complexities that 
can adversely impact schedule and financial outcomes. Our 
commitment to continuous improvement and agile project 
management has enabled us to navigate these challenges 
effectively. Following the achievement of commercial production 
at the LHM on 30 March 2024, production ramped up with 
517,597lb U3O8 produced to 30 June 2024.
Paladin has achieved exceptional safety and operational 
efficiency outcomes during this transformative period. Highlights 
of our FY2024 performance included: 
•	 We have been successful in maintaining strong safety 
performance with over 2.5 million hours worked on the 
Restart Project with no serious injuries or reportable 
environmental incidents and a rolling total recordable injury 
frequency rate (TRIFR) per million hours worked at the LHM 
as at 30 June 2024 of 4.4, and 3.8 for the Company
•	 An independent survey conducted at the LHM found there to 
be an extremely positive culture, with high levels of cooperation, 
respect and care among employees and managers
•	 98% local employees at the LHM in Namibia, reflecting our 
commitment to the communities in which we operate
•	 A geographically diverse world-class offtake contract book 
with leading global uranium industry counterparties in the 
US, Europe and Asia
•	 Execution of commercial agreements with all three Western 
conversion facilities and shipping arrangements secured for 
uranium deliveries
•	 Execution of a US$150M Syndicated Debt Facility providing 
capital flexibility as the Company recommences operations 
at the LHM and progresses its growth options 
•	 Paladin’s interest in the Michelin Uranium Project in Canada 
increased from 75% to 100%, aligning with our strategic 
objectives
•	 An outstanding Total Shareholder Return of +71% for the year, 
culminating in a share price of A$12.48 as at 30 June 2024.
Our Remuneration Approach
We are committed to a competitive remuneration framework 
that rewards performance, and maintains transparency with 
our shareholders. In this report, we detail how executive 
remuneration aligns with both company performance and the 
strategic decisions made by the Board to address external 
impacts on long-term remuneration outcomes.
In line with our commitment to fair remuneration practices, we 
conducted a pay parity review in April 2024. While the review did 
not uncover any significant issues, it highlighted that pay equity 
is largely influenced by the disparity in gender representation, 
which we will continue to address as part of our people and 
culture strategy. 
Despite receiving a supportive vote of 78.68% 'for' our last 
remuneration report, we have not been complacent. While this 
indicates a level of support for our remuneration practices, 
we recognise the importance of continuous improvement 
and responsiveness to our shareholder concerns. We actively 
engaged with our key shareholders and proxy advisors during 
FY2024, gathering invaluable insights into our remuneration 
practices and framework. This feedback highlighted the 
importance of ongoing transparency in our Remuneration Report 
and in ensuring the alignment of our remuneration strategies 
across the company with our strategic direction, particularly with 
regard to the objectives of our remuneration framework and the:
•	 Composition of pay and the disclosure of total remuneration 
opportunities;
•	 Short-term incentive plan measures and outcomes; and 
•	 Long-term incentive arrangements.  
Dear Shareholders, 
PALADIN ENERGY ANNUAL REPORT 2024
53

As outlined in the FY2023 Remuneration Report, our evolution 
into a global uranium producer during the final quarter of FY2024 
necessitated significant changes in our remuneration framework. 
The Company engaged Korn Ferry to complete an independent 
benchmarking and design review of the remuneration framework 
for Executive KMP and Non-Executive Directors against a custom 
peer group of comparable ASX-listed organisations. These changes, 
guided by market practice and good corporate governance, took 
effect on 1 July 2023 and aim to align remuneration with the 
objectives of attracting, retaining and motivating employees while 
delivering sustainable returns to shareholders. 
The revised framework incentivises strong business performance 
and safety outcomes, further enhancing shareholder value. Full 
details of the changes are set out on page 62. Our people remain 
central to what we do and are crucial in delivering strong financial, 
safety and strategic outcomes. Recognising the competitive 
global landscape for critical skills, Paladin rewards our people 
through a market-competitive remuneration framework that 
genuinely supports pay for performance.
FY2024 Remuneration Outcomes
The FY2024 remuneration outcomes reflect the Company's 
exceptional performance over the past year.
Fixed Remuneration
In conjunction with the review of our remuneration framework 
and comprehensive external benchmarking exercise, the Board 
approved an increase in Executive KMP Fixed Remuneration 
(FR) effective 1 July 2023. These increases position Executive 
KMP remuneration competitively in the market compared to our 
peers and reflect the increased complexity of these roles as we 
transition to a production company.  
Further details on the increases to Fixed Remuneration can be 
found on page 69.
Short-term Incentive
For FY2024 we implemented our inaugural Short-Term Incentive 
(STI) Plan (STIP) marking a significant step forward in our 
performance evaluation strategy. The STIP is designed to align our 
Executive KMP and the Company’s objectives for the financial year. 
It comprises stretch performance measures focusing on achieving 
key objectives that align with the Company's core strategic drivers. 
For FY2024, the performance measures focus on safety, delivery 
of the Restart Project on schedule and within budget at the LHM, 
and the achievement of growth and corporate strategic goals.
The STI outcomes reflect our exceptional business performance 
in FY2024. The Board assessed the Company's outstanding 
performance in safety, completion of the Restart Project and 
first production at the LHM, and the achievement of strategic 
priorities. The Board concluded that the Company effectively 
managed factors within its control, and based on this evaluation, 
determined that we achieved 89% of the maximum FY2024 
scorecard outcome and that this accurately reflects the 
Company’s overall performance for the year.
Full details of the Scorecard outcome and STI awarded to 
Executives are outlined on pages 70 to 71. 
The introduction of the STIP, in conjunction with a Long-Term 
Incentive Plan (LTIP), reinforces the Company’s transition towards 
a production company and provides a holistic view towards 
assessing company performance. The Board and the Committee 
will monitor the STIP to ensure it continues aligning reward 
outcomes with key elements of our strategy.
FY2022 Long-Term Incentive Plan Outcomes 
Our LTIP, granted on 1 July 2021 and assessed as of 30 June 
2024, aligns with shareholder expectations, emphasising 
our commitment to generating sustainable returns and our 
dedication to aligning our team's rewards with our strategic 
goals and shareholder interests. Following the three-year 
performance period, our Company's Total Shareholder Return 
(TSR) was +152%. This TSR growth ranked Paladin at the  
87th percentile against our international uranium peers, and 
the 93rd percentile against the general mining peer group. 
As a result, the vesting outcome of the FY2022 LTI is 100%. 
The FY2022 LTI Performance Rights will vest in early FY2025. 
Further information is provided on page 72.
Non-Executive Director fees
In 2023 in conjunction with the review of our remuneration 
framework, we undertook a comprehensive market benchmarking 
exercise of our Non-Executive Director remuneration structure. 
Effective FY2024 we introduced committee fees for chairs and 
members (except for the Board Chair) to ensure our fee structure 
is comparable with market practice. These fees were set between 
P50 and P75 of the peer market. An increase to the Board 
Chair’s base fees was also approved, reflective of the peer group 
benchmarking. Further information is provided on pages 75 to 76.
Looking Forward to FY2025
Retention of highly skilled executives and employees is of 
paramount importance to the Board. 
Looking ahead, Paladin is poised for its first full year of production 
at the LHM. With a clear strategy and defined purpose, we are 
focused on achieving operational excellence, strategic growth, 
and sustainability, aiming to unlock significant value for all 
stakeholders. The Board will continue to consider Executive KMP 
remuneration within this context, as well as relevant industry 
benchmarks, to ensure appropriate performance-linked rewards.
On behalf of the Board, I invite you to review the FY2024 
Remuneration Report. We value our shareholders' support and 
welcome your feedback as we strive to enhance our report's 
transparency and clarity for the benefit of our shareholders. 
Thank you for your continued support of Paladin Energy. We look 
forward to our ongoing engagement with you and sharing in the 
Company's future success.
Remuneration Report
Yours faithfully
Lesley Adams
Chair, Governance, Remuneration and Nomination Committee
PALADIN ENERGY ANNUAL REPORT 2024
54

Introduction
56
FY2024 Highlights	
57
Remuneration Governance & Decision Making	
58
Overview of Executive KMP Remuneration in FY2024	
60
Remuneration Framework FY2024	
61
Alignment between Remuneration Outcomes and Performance	 68 
FY2024 Executive KMP Remuneration Outcomes 
69
Executive KMP Statutory Remuneration Disclosures	
74
Non-Executive Director Remuneration 	
75
Additional Statutory Information	
77
Remuneration Report
Remuneration Report structure
PALADIN ENERGY ANNUAL REPORT 2024
55

Remuneration Report (Audited)
Introduction
The Directors present the Remuneration Report for FY2024 
which details remuneration information for Key Management 
Personnel (KMP) as well as key aspects of our remuneration 
policy and framework for FY2024.   
Our KMP are the Executives who have authority and 
responsibility for planning, directing, and controlling the 
major activities of the Group, directly or indirectly, including 
any director, whether executive or otherwise, of the parent 
company. KMP comprise the Non-Executive Directors of the 
Company and key Executives.
The Company’s KMP comprised the following persons in the 
financial year ended 30 June 2024. All Executive KMP listed 
below have held their respective positions for the full financial 
year. For the purposes of this report, the term Executive includes 
the Chief Executive Officer (CEO) and other Executive KMP.  
Non-Executive Directors KMP
Mr Cliff Lawrenson (Chair)
Mr Peter Watson
Mr Peter Main
Ms Melissa Holzberger1
Ms Joanne Palmer
Dr Jon Hronsky, OAM
Mrs Lesley Adams
Executive KMP
Mr Ian Purdy, Chief Executive Officer
Mr Paul Hemburrow, Chief Operating Officer
Ms Anna Sudlow, Chief Financial Officer
Mr Alex Rybak, Chief Commercial Officer
TABLE 1   FY2024 KMP:
1  Ms Melissa Holzberger resigned as a Non-Executive Director effective 23 August 2024
PALADIN ENERGY ANNUAL REPORT 2024
56

Remuneration Report (Audited)
FY2024 Highlights
Company wide rolling TRIFR of  
3.8 per million hours worked  
(exceeding stretch outcomes)	
2.5 million hours worked with 
no serious injuries or reportable 
environmental incidents on the 
Restart Project		
98% LHM local employees and 
turnover at less than 2%
100% Director Independence;            
43% Female Board Gender 
Balance	 	
100% compliance with laws, 
regulations, licence and permit 
conditions
No environmental  
non-compliances or breaches
Expanded ESG disclosures under 
the integrated sustainability 
reporting framework, and 
alignment of disclosures with 
SASB, GRI and TCFD
Strong local community 
commitment through jobs, 
education and procurement
Conducted climate risk and 
opportunities assessment  
for our operations 
517,597lb U3O8 produced 
to 30 June 2024
Outstanding Total Shareholder 
Return of +71% for the one-year 
period and +152% for the three-
year period ending 30 June 2024
Execution of a US$150 million 
Syndicated Debt Facility 
Increased interest in Michelin 
Joint Venture from 75% to 100%
LHM Restart 
Project completed 
on time and within 
cost forecast
ESG
PALADIN ENERGY ANNUAL REPORT 2024
57

Remuneration Report (Audited)
Remuneration Governance & Decision Making
Role of the Board and the Governance, Remuneration & Nomination Committee 
Paladin is committed to fostering a culture of innovation, growth, and sustainable development. Central to this is attracting, motivating, 
and retaining highly skilled Executives and staff. 
The diagram below illustrates the roles of the Board, the Committee, and management in relation to Executive KMP remuneration decisions.
Board
CEO & 
Management
Responsible for setting and overseeing Paladin’s remuneration framework and principles 
and determining Non-Executive Director and Executive KMP remuneration.
Delegates oversight of remuneration decisions to the Governance, Remuneration & 
Nominations Committee.
Responsible for implementing remuneration policies and practices and advising the 
Committee on changing market conditions. Reports on a range of matters including 
diversity and succession planning.
Our CEO makes recommendations on remuneration outcomes for our Executive team.
Governance, 
Remuneration 
& Nomination 
Committee
The Committee, consisting solely of independent, Non-Executive Directors, is tasked with 
the responsibility to monitor, review and make recommendations to the Board in respect 
of the remuneration strategy, incentives, talent management, culture and engagement, 
diversity and inclusion, leadership development and other matters referred by the Board.
The Committee advises the Board on Executive and Non-Executive performance and 
remuneration outcomes and ensures compliance with applicable legal and regulatory 
matters in respect to remuneration.
Advice and additional information sought from management and external consultants as 
required.
Further information on the Committee’s role and responsibilities can be found in its charter, 
available on the Company’s website.
External 
Remuneration 
Consultants
Engaged as required to provide external advice 
and information on remuneration-related issues, 
that is free from influence of management.
The roles of the Board, the Committee, and management 
in relation to Executive KMP remuneration decisions
PALADIN ENERGY ANNUAL REPORT 2024
58

Remuneration Report (Audited)
Remuneration Principles
The Board understands that the success of the Company depends on the quality of its leaders. The Company’s remuneration strategy 
and framework is reviewed regularly by the Board and Committee to ensure their relevance and alignment with market practice. This 
approach helps the Company be clear, responsible, and focused on increasing value for its shareholders over the long term.
Review of Remuneration Arrangements
From time to time, the Company will seek advice from external advisors to provide relevant information including benchmarking and 
other market data to assist the Committee with its decision-making. During the 2023 financial year, advice was sought from Korn Ferry 
to benchmark KMP remuneration, including Fixed Remuneration and incentive structures and Non-Executive Director fees, against 
relevant ASX-listed organisations. Korn Ferry did not provide any remuneration recommendations in relation to any KMP as defined in 
the Corporations Act 2001 (Cth).
Employment Contracts
Employment contracts are entered into with the CEO and Executives. Details of these contracts are outlined later in this report. In 
accordance with good governance, the structure of Non-Executive Director and Executive KMP remuneration is separate and distinct.
Reward for capability,  
experience, and  
creation of sustained 
shareholder value
Simple and transparent 
structure that is well 
understood to create a 
high level of understanding 
of the link between 
performance and reward
Market competitive  
to attract and retain 
high-calibre talent
Establishes a strong 
alignment between pay 
and overall business 
performance to motivate 
and incentivise high 
performance aligned 
with Paladin’s values
PALADIN ENERGY ANNUAL REPORT 2024
59

Overview of Executive KMP Remuneration in FY2024
Fixed Remuneration
Effective 1 July 2023, the Fixed Remuneration for Executive KMP was adjusted following a 
thorough benchmarking exercise.
Page 69 provides details of the FY2024 Fixed Remuneration for Executive KMP.
FY2024 STI
Paladin introduced a STIP effective 1 July 2023 with the following Corporate Scorecard Measures:
•	 Safety 
The Company was pleased to exceed the FY2024 safety targets set, and has a continued 
ongoing focus to drive improvements in safety performance, delivering operationally targeted 
safety interventions and training programs
•	 Commercial production at the Langer Heinrich Mine by 31 March 2024 and within budget 
Paladin successfully achieved the commercial production targets set for FY2024, achieving 
commercial production on schedule on 30 March 2024, and below the Restart Project and 
Operational Readiness budget
•	 Production 
Following the achievement of commercial production at the LHM, production was 517,597lb 
U3O8 for FY2024 and will continue to ramp up during FY2025
•	 Growth & Corporate Strategic Goals 
The Company was pleased to exceed its growth & corporate strategic goals set for FY2024, 
including enhanced liquidity and financial flexibility with the execution of a S$150M Syndicated 
Debt Facility, an enhanced uranium offtake book and an increase in interest in the Michelin 
asset from 75% to 100%.
Pages 64 to 65 sets out detailed information on the FY2024 STIP.
FY2024 LTIP
Following the introduction of the STIP, the FY2024 LTIP was reduced as a percentage of Fixed 
Remuneration. Full details can be found on page 62.
The Performance Period for the Performance Rights under the FY2024 LTIP is the three-year 
period from 1 July 2023 to 30 June 2026.	
For the FY2024 LTI award, the Board approved two equally weighted Relative Total Shareholder 
Return (r-TSR) performances measures, independently assessed against peer groups:
1.	 Organisations featured in the ASX200 (but not in the ASX50) index, and classed under the 
Energy sector or Metals & Mining industry, excluding companies operating in Oil and Gas  
(50% weighting); and
2.	 A custom peer group inclusive of globally listed companies operating in the Uranium extraction 
sector (50% weighting).  
In FY2024, a partial gateway was introduced whereby positive absolute total shareholder return 
(a-TSR) over the Performance Period for the Performance Rights under the FY2024 LTIP is the 
three-year period from 1 July 2023 serves as a modifier to award outcomes. This means that if 
a positive a-TSR is not achieved, 50% of the total award that would have otherwise vested will 
lapse. This strategic enhancement aligns executive reward with the experience of shareholders, 
ensuring that executives’ rewards are contingent on the Company’s success in delivering positive 
shareholder returns.
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
60

Remuneration Framework FY2024
Changes to our Remuneration Framework in FY2024
Attracting and retaining exceptional talent is crucial for our 
long-term sustainability and achieving our strategic objectives. 
In a competitive marketplace, a remuneration framework 
that aligns with market practice and rewards performance is 
essential to retain Executive KMP who can adeptly navigate the 
opportunities ahead.
Having previously undertaken external benchmarking of KMP 
remuneration and our framework in 2021, we initiated a further 
review in 2023 to align with our transition to a production 
environment. As part of this process, we engaged Korn Ferry 
to conduct a comprehensive, independent review of the 
Company’s remuneration framework, which was completed in 
May 2023. 
The review assessed the suitability of our existing framework 
to support our advancement towards operational maturity, 
ensuring alignment with market practices and with the long-
term objective of enhancing shareholder value.
Alignment of the Remuneration Framework to our Strategy
Acknowledging the transition of the Company into a production 
phase, the remuneration framework aligns reward outcomes 
with key elements of our strategy. The revised framework:
•	 underscores our commitment to evolving our remuneration 
strategy in line with our business maturity and strategic 
direction; 
•	 is designed to ensure competitiveness in retaining 
and rewarding our KMP, focusing on performance and 
contribution to our growth trajectory; and
•	 links rewards directly to the achievement of key elements 
of our strategy that will unlock long-term value for all 
stakeholders.
Remuneration Benchmarking and Strategic Market 
Positioning
In the current business environment, substantial competition 
exists for top talent. As a result of the benchmarking and 
analysis, we have strategically positioned our remuneration 
within the 50th and 75th percentiles relative to companies 
of comparable size and operating in similar industries. This 
positioning ensures that our compensation is aligned with 
market practices and remains competitive among peer 
companies. 
In determining the relevant market, Paladin and Korn Ferry 
considered:
•	 ASX listed organisations in the mining sector that are 
comparable in terms of market capitalisation and other 
relevant financial indicators;
•	 The maturity and production stage of the company;
•	 Engagement in the mining of materials required in the global 
energy transition and/or overseas operations; and
•	 Companies that are either sources of talent or potential 
competitors for our existing talent.
A custom peer group of comparable ASX-listed organisations 
operating in the mining sector was selected:
Liontown Resources Limited	 	
Perseus Mining Limited	
	
	
Sandfire Resources Limited	
Chalice Mining Limited	
	
	
Nexgen Energy (Canada) Ltd	 	
Nickel Industries Limited
Core Lithium Ltd	
	
	
	
Syrah Resources Limited	
	
	
West African Resources Limited
Resolute Mining Limited
The review concluded Executive KMP:
•	 Fixed Remuneration (base salary, superannuation and cash 
allowances) was positioned at P25, and below the target 
benchmark; 
•	 Total Annual Reward (fixed remuneration and short-term 
incentives) (TAR) was below market as a result of no STI 
being offered; and
•	 Aggregate Reward (TAR and long-term incentives) was 
positioned below P50.
As a result, the changes set out in Table 2 were implemented 
effective 1 July 2023.
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
61

FY2024 changes to the Remuneration Framework
Short-Term Incentive
A STI Plan was implemented with effect from 1 July 2023 to further align Executive KMP rewards 
with performance. 
The STI, payable as a cash payment, is wholly based on the achievement of short-term Corporate 
Scorecard Measures.
For FY2024, the target STI opportunity as a percentage of Fixed Remuneration is 60% for the CEO 
and for 50% for other Executive KMP. Stretch performance represents 120% for the CEO and 100% 
for other Executive KMP of Fixed Remuneration.
Long-term Incentive
We enhanced our LTI design by implementing the following changes summarised below.
•	 LTI opportunity reduced reflecting the introduction of the STIP.
•	 For FY2024, the LTI opportunity is 120% for the CEO and 100% for other Executive KMP.
•	 Introduction of a positive a-TSR performance gateway to further align Executive KMP reward 
with shareholder experience.
•	 ASX peer group updated from ASX300 to ASX200 to align with our entry into this index, ensuring 
comparison with relevant peers.
FY2023
FY2024
LTI as a % of FR
CEO - LTI %
Other Executive KMP - LTI %
110%
100%
URANIUM 
PEER GROUP
50%
URANIUM 
PEER GROUP
50%
ASX300  
GENERAL MINING 
PEER GROUP
50%
ASX200
50% 
Energy sector and 
Metals & Mining 
Industry (excluding 
ASX50 and oil & gas 
companies)
TABLE 2  FY2024 changes to the Remuneration Framework
POSITIVE TSR (MODIFIER)
140%
120%
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
62

Component
Fixed Remuneration
Short-Term Incentive (STI)
Long-Term Incentive (LTI)
Objective
Attract and retain high 
calibre Executive KMP 
to deliver Paladin’s 
strategy.
Motivate Executive KMP for achievement 
of Performance Measures that support 
stakeholder interests and linked to our 
strategy.
There are no individual performance 
targets in the STIP. Instead, all measures 
are based on the performance of the 
company, aligning all participants 
towards achieving shared objectives.
Drive long-term performance and achieve 
outcomes that are aligned with shareholders.
Purpose
Provides a competitive 
Fixed Remuneration, 
determined by the job 
size, role requirements, 
individual skills, 
experience and 
performance, and 
benchmarked to 
ensure it remains 
competitive to attract 
and retain required 
capability.
Drive performance aligned with our short-
term strategic objectives and supports 
long-term value creation. Rewards 
Executive KMP for achievement of key 
financial and non-financial Performance 
Measures over a 12-month period.
The Performance Measures are approved 
annually to ensure they can be objectively 
and reliably measured and are directly 
linked to value for shareholders. 
Targets are set by the Board to ensure 
a challenging performance-based 
incentive is provided. The Board assesses 
achievement against the metrics at the 
end of the financial year.
Focus the senior leadership team on long-term 
value creation by encouraging decision making 
that supports sustainable growth in shareholder 
value and sustained long-term performance.
Link to 
Performance
Company and 
individual performance 
are central to the 
annual remuneration 
review. 
The STI reflects performance during the 
financial year and measures outcomes 
within the control of the Executive KMP. 
The corporate scorecard measures, 
which encompass key business drivers, 
are considered and assessed to ensure 
annual incentive allocations accurately 
reflect our corporate achievements and 
alignment with strategic objectives.  
Vesting of awards is dependent on TSR 
performance measured over three-years, relative 
to two equally weighted peer groups:
•	 Uranium Peer Group
•	 ASX200, and classed under the Energy sector, 
or Metals & Mining Industry (excluding the 
ASX50 and companies operating in Oil & Gas).
The r-TSR metric aligns the reward of executives 
with shareholder interests and reflects the creation 
of shareholder value above peers.
Positive a-TSR over the Performance Period serves 
as a modifier to award outcomes. This means that 
if positive a-TSR is not achieved, 50% of the total 
award that would have otherwise vested will lapse.
Delivery
Base Salary
Superannuation
Cash (100%)
The Board retains discretion to pay 
some, or all, of the STI Plan in equity.
Performance Rights
Remuneration 
Mix in FY2024
Our remuneration framework is weighted towards variable (at-risk) remuneration to align with the interests of 
shareholders and drive performance against short and long-term business objectives. The graphs below summarise 
the current Executive KMP pay mix (at maximum (stretch) performance) which is considered appropriate for Paladin 
based on the maturity of the Company.
Components of our remuneration framework for FY2024
Remuneration Report (Audited)
35%
33.3%
30%
33.3%
35%
33.3%
Fixed Remuneration
STI (at risk)
LTI Performance Rights (at risk)
CEO
OTHER 
EXECUTIVE 
KMP
PALADIN ENERGY ANNUAL REPORT 2024
63

Our Contracts
Remuneration and other terms of employment for the Executives are formalised in Executive 
contracts. The key terms for all Executive KMP include:
Component
CEO
Other Executive KMP
Contract duration
No fixed term
No fixed term
Notice by the Individual/Company1
6 months
3 months
Termination Benefit
Not specified
Not specified
1 Paladin may terminate an Executive KMP’s employment agreement without notice or without having to provide payment in lieu of notice 
where there is serious misconduct or other grounds for summary dismissal
Minimum Shareholding 
Requirement
The Board recognises the importance of aligning the interests of our Executives with those of our 
shareholders. Our focus on equity-based remuneration through our LTI Plan, encourages Executives to 
behave like shareholders.
While the Company does not currently have a minimum shareholding requirement for Executive KMP, 
all Executives are encouraged to, and do, hold a substantial number of shares (relative to the length of 
their employment) as disclosed in Table 16. The Board reviews this position annually, and if appropriate 
will introduce a formal policy and targets.
Performance Period
The Company’s financial year (12 months), commencing on 1 July of the financial year.
STI Opportunity
The STI Opportunity is calculated as a percentage of Fixed Remuneration (FR).
Target Value
(% of FR)
Maximum Value
(% of FR)
CEO
60%
120%
Other Executive KMP
50%
100%
Award Determination
For each Scorecard Performance Measure there are defined Key Performance Indicators (KPIs) 
with targets that are capable of objective assessment to ensure a challenging performance-based 
incentive is provided.
Fixed Remuneration
Fixed Remuneration is structured to attract, motivate and retain high performing individuals within our Company in a competitive talent 
market, to effectively manage a complex global business. Fixed Remuneration levels are determined taking into account the size and 
complexity of the role, accountabilities, skills, and experience. 
Executive KMP Fixed Remuneration is reviewed annually and with reference to company and individual performance, relevant 
comparative remuneration, and where appropriate information and advice from external consultants.
Short-term Incentive
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
64

Corporate Scorecard Measures
During the annual business planning cycle, the Board establishes key Performance Measures that 
represent objectives aligned with the business’s core strategic drivers for the Performance Period.
For each key Performance Measure, a base or threshold performance level is established. The 
Performance Measures are designed to be challenging, with maximum award opportunities aligned 
with outstanding performance. 
The Board consistently monitors progress in relation to these Performance Measures over the 
course of the Performance Period. 
Rationale and links to strategy
Performance Measure Weighing
Rationale
Safety
20%
Safety is a cornerstone of our operational excellence and 
corporate responsibility, reflecting our commitment to the safety 
and well-being of our people, customers, and the communities 
in which we operate.
Any fatalities will result in a zero payment for safety.
Commercial 
production by  
31 March 2024 and 
within budget
50%
Deliver commercial production on schedule in line with market 
guidance. Deliver the Restart Project and Operational Readiness 
program within budget.
Production
10%
Production is at the core of our business and the primary driver 
of revenue. This is a key measure of the Company’s overall 
performance, underpinning annual earnings and cash flow. 
Growth & Corporate 
Strategic Goals 
20%
Evaluates performance in relation to execution of growth plans 
and strategic initiatives, critical for ensuring sufficient liquidity 
and enhancing shareholder value.
Board Assessment
The payment of the STI is subject to Board approval. At the conclusion of the Performance Period, the 
Board evaluates performance against the Corporate Scorecard and retains the discretion to adjust the 
outcome to ensure it is appropriate and fair in the circumstances. This discretion may be exercised in 
the case of extraordinary or unanticipated external events that are beyond management’s control, or 
if the results generate unintended outcomes. In the event discretion is exercised, disclosure and the 
rationale will be provided in the corresponding Remuneration Report.
Cessation of employment
If a participant is not employed by Paladin on the date of payment or has resigned prior on date of 
payment, the participant will be ineligible for a STI payment.
If a participant ceases employment for any other reason, the Board has discretion to pay a pro-rata 
payment.
Change of Control
Awards to be evaluated against performance criteria prior to Change in Control and are payable 
subject to Board discretion.
Clawback and Malus
The Board retains full discretion to clawback awards in certain circumstances to ensure participants 
do not obtain an inappropriate benefit. The circumstances in which the Board may exercise this 
discretion are extensive and include, without being limited to, situations where an Executive has 
engaged in misconduct, where there has been a material misstatement of the Company’s results in 
payment, behaviours of participants that bring the Company into disrepute or any other reasonable 
factor as determined by the Board.
20%
20%
10%
50%
Safety
Commercial Production
Production
Growth & Corporate Strategic Goals
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
65

Performance
Performance is measured over a three-year vesting period commencing on 1 July of the financial year.
Payment Vehicle
LTI Plan awards are delivered in Performance Rights granted for no consideration. The Performance 
Rights are a right to receive fully paid ordinary shares subject to meeting the performance and 
vesting conditions.
LTI Opportunity
The LTI Plan opportunity is calculated as a percentage of Fixed Remuneration.
Maximum Value
(% of FR)
CEO1
120%
Other Executive KMP
100%
The number of Performance Rights granted is calculated by dividing the LTI Opportunity value (e.g. 
the applicable percentage of Fixed Remuneration) by the Volume Weighted Average Price (VWAP) for 
Paladin shares over a period determined by the Board at the time of the award.
1	 The FY2024 LTI Opportunity for the CEO (120%) was incorrectly reported on page 60 of the FY2023 Remuneration Report as 140%.
LTI Performance Measures
The LTI Performance Measures approved by the Board are designed to align the interests of 
shareholders and Executive KMP and encourage Executives to focus on factors that drive sustainable 
growth in shareholder value.
To ensure the effectiveness and relevance of the r-TSR measure, the peer group(s) against which 
Paladin is measured will be reviewed annually to ensure a diverse group of companies against which 
Paladin’s share price performance can be appropriately benchmarked.
Rationale and links to strategy
Performance Measure
Weighting
Rationale
r-TSR
Uranium Peer Group
50%
We have selected two distinct peer groups to provide a 
focused comparison against our core industry competitors as 
well as general market performance, aligned with shareholder 
experience.
ASX200 Peer Group1
50%
Positive TSR Modifier     
Ensures that Executives’ rewards are contingent on the Company’s success in delivering positive 
shareholder returns, reflecting creation of shareholder value above peers. If positive a-TSR is not 
achieved, 50% of the total award that would have otherwise vested will lapse.
1	 Organisations featured in the ASX200 (but not in the ASX50) index, and includes companies classed under the Energy sector or 
Metals & Mining Industry; excluding companies in the ASX50 and those operating in Oil and Gas.
Dividends and Voting Rights
Performance Rights do not carry entitlements to dividends, dividend equivalent payments or voting.
Long-term Incentive
50%
50%
R-TSR: Uranium Peer Group
R-TSR: ASX200 Peer Group
POSITIVE TSR 
MODIFIER
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
66

Vesting Hurdle
The vesting of the FY2024 LTI Plan will be dependent on:
•	 the outcome of Paladin’s r-TSR performance. There is a minimum performance level that must be 
achieved; and
•	 positive a-TSR over the Performance Period which serves as a modifier to award outcomes. If a 
positive a-TSR is not achieved, 50% of the total award that would have otherwise vested will lapse.
Relative TSR Performance
% Performance Rights to Vest
Peer TSR Comparison <50th percentile
0%
50th percentile < peer TSR comparison <75th percentile
Pro-rata between 50% and 100%
Peer TSR comparison >75th percentile
100%
Assessing
The Committee is responsible for assessing performance against criteria and recommending to the 
Board the LTI to be paid. To assist in this assessment a third-party service provider will be engaged to 
report on the market performance condition (i.e. r-TSR ranking within the comparator group as defined 
in each of the LTI Plan at each grant date).
Vesting of Performance Rights
Vesting of the Performance Rights is subject to continuity of service (unless the Board determines 
otherwise) and the assessment of Paladin’s r-TSR performance as set out above. 
To the extent that the applicable Performance Measures are achieved at the end of the three-year 
Performance Period, LTI awards are delivered by vesting of all or a portion of Performance Rights 
in return for allocation to participants of fully paid ordinary shares. To the extent the Performance 
Measures are not satisfied during the Performance Period, the Performance Rights will lapse.
Cessation of Employment
If an Executive resigns or is terminated for cause (including gross misconduct), unvested Performance 
Rights will lapse upon cessation of employment.  
Where an Executive ceases employment due to retirement, total and permanent disablement, 
redundancy or death, unvested Performance Rights may vest subject to Board discretion.
The Board retains discretion to determine different treatment on cessation if considered appropriate in 
the circumstances. 
Change of Control
If a change of control event occurs the Board may determine in its absolute discretion the treatment 
of unvested Performance Rights and the timing of such treatment, which may include determining 
that some or all unvested Performance Rights vest, lapse or become subject to substitute or varied 
conditions, having regard to any matter the Board considers relevant including, but not limited to, the 
circumstances of the event, the extent to which the applicable Performance Measures have been 
satisfied at the time of the event, and the proportion of time remaining in the Performance Period.  
Any Performance Rights not vested under the Change of Control rules lapse immediately.
Clawback and Malus
The Board has the discretion to reduce or clawback all Performance Rights if an eligible person or their 
permitted nominee acts fraudulently or dishonestly or is in material breach of his or her obligations. 
This ensures Executives do not obtain an inappropriate benefit.
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
67

Alignment between Remuneration Outcomes and Performance 
Paladin’s remuneration policy includes short-term and long-term incentive plans to align management performance with shareholder 
interests. The Board issues Performance Rights to the Executive KMP as well as other employees with a certain level of influence over 
the Company’s performance. The Performance Measures that drive the vesting of these LTIs include Paladin’s TSR relative to its peer 
groups. 
Executive remuneration is designed to link strategic and business objectives with the creation of shareholder wealth. Table 3 below 
shows the measures of the Company’s financial performance over the last five years as required by the Corporations Act (Cth) 2001.
The number of Performance Rights, issued shares, share prices and fair values in the following tables in this report reflect the 
consolidation of issued capital on the basis that every 10 shares be consolidated into 1 share completed in April 2024.
2024
2023
2022
2021
2020
Profit/(loss) attributable to members of the parent (US$’000)
53,628
(10,572)
(26,743)
(43,983)
(79,866)
Share price at financial year end (A$)
12.48
7.30
5.80
5.15
0.98
Market capitalisation at year end (US$B)
2.48
1.44
1.19
1.03
0.14
Total dividends declared (US cents/share)
Nil
Nil
Nil
Nil
Nil
Returns of capital (US cents/share)
Nil
Nil
Nil
Nil
Nil
Basic earnings/(loss) per share (US cents/share)
17.9
(4.0)
(10.0)
(20.0)
(17.0)
TABLE 3  Five-year statutory results
Trading performance (1 July 2023 to 30 June 2024)
Paladin’s 12 month share price performance
The graph below provides the overview of Paladin 12 month share price performance relative to indices. Paladin's trading performance 
from 1 July 2023 to 30 June 2024 achieved an outstanding Total Shareholder Return of +71% for the year.
Jul 23
Oct 23
Jan 24
Apr 24
Jun 24
$20
$18
$16
$14
$12
$10
$8
$6
$4
$2
$0
Performance (rebased to Paladin)
Paladin
ASX200 Materials
Sprott Uranium Miners ETF
ASX200 Energy
ASX200
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
68

Remuneration Report (Audited)
FY2024 Executive KMP Remuneration Outcomes 
Fixed Remuneration
Historically Executive KMP Fixed Remuneration has been reported exclusive of superannuation. From FY2024, we will disclose all Fixed 
Remuneration (including historically for comparative purposes) inclusive of superannuation, to better align with common practice and 
enhance transparency.
The Committee has completed a comprehensive review of the Fixed Remuneration for our Executive KMP for FY2024 having regard to 
the changing nature of the company, adopted target market position and benchmarking against a peer group of comparable ASX listed 
organisations. Following this evaluation, the Board approved to increase Fixed Remuneration effective from 1 July 2023.
Name
FY2023
FY2024
% Increase
Mr Ian Purdy
A$585,292
A$745,000
27%
Mr Paul Hemburrow
A$405,292
A$485,000
20%
Ms Anna Sudlow
A$385,792
A$465,000
21%
Mr Alex Rybak
A$334,292
A$385,000
15%
The Board believes these increases recognise the strong performance and leadership of the Executive KMP during a pivotal 
transformational period for the Company. They also recognise the increased responsibilities assumed by the Executive KMP as the 
company transitions to a production environment and establishes itself as a global uranium producer. The increases ensure we remain 
competitive against external market peers and recognise the critical role that retaining the depth and expertise of our Executive KMP 
talent plays in value creation for our Company.
For FY2025, Executive KMP Fixed Remuneration will increase by an average of 2.5%, below the average salary increase applied to 
other Paladin and LHM employees.
PALADIN ENERGY ANNUAL REPORT 2024
69

FY2024
KPI / Measure
Weighting  
(% at target)
Performance
Result and Outcomes
Weighted 
Outcome (%)
Safety
TRIFR
10%
•	 Outstanding safety achievement in FY2024
•	 No serious injuries or reportable environmental incidents on the LHM  
Restart Project
•	 Company wide TRIFR of 3.8 per million hours worked, exceeding stretch 
outcomes
20%
Safety Systems & Processes
10%
•	 Safety systems and processes implemented at our operations in Namibia and 
at our Canadian exploration camp
•	 Operationally targeted safety interventions and training programs delivered
•	 Independent LHM safety cultural survey results with a high survey response 
rate of 86% and demonstrating above benchmark performance on over 85% of 
the rating questions
20%
Commercial Production
Commercial Production by  
31 March 2024
35%
•	 Delivery of commercial production at the LHM was achieved on schedule on  
30 March 2024, in line with stretch targets
70%
Financials: Total budget 
of US$147M comprised of 
Total Restart Project Cost 
(US$118M) and Operational 
Readiness (US$29M)
15%
•	 Commercial production cost target at Langer Heinrich was achieved at a total 
cost of US$141M, below the budget of US$147M
30%
Production
Production Volumes
10%
•	 The Company set a challenging production target for FY2024 and this 
Performance Measure was not achieved
0%
Growth & Corporate Strategic Goals
Growth and Corporate 
Strategic goals related to:
	
−
our exploration program;
	
−
liquidity;
	
−
commercial contracts; 
and
	
−
growth plans.
20%
•	 Stretch achievement on a number of strategic priorities, including:
	−
Additional liquidity and financial flexibility with the execution of a competitive 
and flexible US$150M Syndicated Debt Facility to enhance the balance sheet 
and provide working capital during the ramp up of operations at the LHM
	−
An enhanced uranium offtake book with high quality counterparties and 
materially improved pricing and terms to the existing book while retaining 
material market price exposure
	−
All arrangements made to commence shipments to customers from the 
LHM prior to the end of the financial year
	−
An increase in interest in the Michelin asset from 75% to 100% at nil 
acquisition cost with these exploration licences securing 127.7Mlbs of 
uranium Mineral Resource
	−
Successful execution of the Michelin drilling program with the decision taken 
to commence a PFS in FY2025
36%
Overall STI Outcome
% of Target
% of Maximum
176%
88%
Short-term Incentive
At the completion of the Performance Period, the Board assessed performance against the FY2024 STI Performance Measures and 
outcomes are detailed in Table 4 below.
TABLE 4  FY2024 STI Outcomes
Remuneration Report (Audited)
Application of Board Discretion
The Board reviewed the STI Outcomes in conjunction with the Company’s overall performance to ensure the scorecard accurately reflects 
the year’s achievements. This evaluation considered our strong performance in our Safety, Commercial Production, and Growth and 
Corporate Strategic Goals measures within the STI scorecard, as well as outstanding shareholder returns.  
The Board applied a minor adjustment to the STI outcome, resulting in an overall score of 89% of the maximum FY2024 scorecard 
outcome, instead of the unadjusted 88%. The stretch Growth and Corporate KPI we set for FY2024 included securing an early shipment 
opportunity before the end of the financial year. Although the cargo was at the port, prepared and booked for shipment prior to the end 
of FY2024, a fire onboard the vessel unfortunately caused an unforeseen delay and the shipment was rescheduled to a later vessel. After 
careful consideration of this unforeseen event and acknowledging that the early shipment would have been achieved but for the fire 
on the vessel, the Board concluded the Company effectively managed the factors within its control and determined to adopt a stretch 
outcome for this KPI.
PALADIN ENERGY ANNUAL REPORT 2024
70

FY2024
Maximum STI 
Opportunity (A$)
Actual STI 
Outcome (A$)
Actual STI payment as  
a % of maximum (%)
% of maximum STI 
forfeited (%)
Mr Ian Purdy
894,000
795,660
89%
11%
Mr Paul Hemburrow
485,000
431,650
89%
11%
Ms Anna Sudlow
465,000
413,850
89%
11%
Mr Alex Rybak
385,000
342,650
89%
11%
Long-term Incentive
LTI Granted in FY2024
At the Board’s discretion, Executive KMP receive an annual grant of LTI Performance Rights. The FY2024 LTI was granted on 1 July 2023 
(FY2024 LTI) and is subject to a three-year Performance Period and performance hurdles as outlined in Table 6.
The STI award for Executive KMP for FY2024 reflects the Board assessment of performance against the STI Performance Measures.
TABLE 5  STI award for Executive KMP in FY2024
TABLE 6  FY2024 LTI Grants
Executive
% of Fixed 
Remuneration 
Grant Value  
(A$)
Number of Performance 
Rights granted1
Anticipated  
vesting date
Mr Ian Purdy
120
894,000
127,661
30 June 2026
Mr Paul Hemburrow
100
485,000
69,257
30 June 2026
Ms Anna Sudlow
100
465,000
66,401
30 June 2026
Mr Alex Rybak
100
385,000
54,977
30 June 2026
1	 The number of awards granted to Executive KMP is calculated by dividing the face value by the VWAP of Paladin shares traded on the ASX over the five business days prior to the 
date of grant.
Remuneration Report (Audited)
The FY2024 Peer Groups are:
Peer Group 1: ASX Peer Group Index (ASX 200 excluding  
ASX 50) (weighted at 50%)
Peer Group 2: Uranium Peer Group (weighted at 50%)
Ticker
Company Name
LYC
Lynas Rare Earth Limited
EVN
Evolution Mining Limited
LTR
Liontown Resources Limited
WHC
Whitehaven Coal Limited
ILU
Iluka Resources Limited
NHC
New Hope Corporation Limited
AWC
Alumina Limited
CIA
Champion Iron Limited
NIC
Nickel Industries Limited
SFR
Sandfire Resources Limited
CHN
Chalice Mining Limited
PRU
Perseus Mining Limited
DRR
Deterra Royalties Limited
CRN
Coronado Global Resources Inc.
DEG
De Grey Mining Limited
PDN
Paladin Energy Ltd
GOR
Gold Road Resources Limited
CXO
Core Lithium Ltd
SYA
Sayona Mining Limited
CMM
Capricorn Metals Ltd
RRL
Regis Resources Limited
BGL
Bellevue Gold Limited
SLR
Silver Lake Resources Limited
WAF
West African Resources Limited
LKE
Lake Resources N.L.
SYR
Syrah Resources Limited
Ticker
Company Name
ASX Listed
PDN
Paladin Energy Ltd
BOE
Boss Energy Ltd
DYL
Deep Yellow Limited
BMN
Bannerman Energy Ltd
BKY
Berkeley Energia Limited
LOT
Lotus Resources Limited
PEN
Peninsula Energy Limited
Other
Company Name
UEC (NYSE)
Uranium Energy Corp
KAP (LSE)
National Atomic Company Kazatomprom JSC Sponsored 
GDR RegS
Ticker
Company Name
Canadian Listed
CCO
Cameco Corporation
NXE
NexGen Energy Ltd
DML
Denison Mines Corp.
EFR
Energy Fuels Inc.
GLO
Global Atomic Corporation
FCU
Fission Uranium Corp.
URE
Ur-Energy Inc.
EU
enCore Energy Corp.
ISO
IsoEnergy Ltd
PALADIN ENERGY ANNUAL REPORT 2024
71

Total Shareholder Return
1 July 2021 - 30 June 2024
Remuneration Report (Audited)
The vesting outcome of the FY2022 LTI is summarised below:
FY2022 LTI Vesting
Table 7 provides an overview of the outcomes related to the FY2022 LTIP Performance Rights granted on 1 July 2021 (FY2022 LTI). These 
were tested at the conclusion of the three-year Performance Period on 30 June 2024. Vesting will occur in early FY2025 and will be 
reported as realised remuneration in the FY2025 Remuneration Report.
1  TSR calculation based on a 20 day VWAP prior to the end of the Performance Period 
Full details of the FY2022 LTI are disclosed in the Company’s FY2022 Remuneration Report, and the details of Performance Rights held by 
Executive KMP are set out on page 79 of this Remuneration Report.
Performance Measure1
Weighting
FY2022 Outcome
Performance  
Outcome (%)
r-TSR (International Uranium Peers)
50%
87th percentile
100
r-TSR (General Mining Peer Group)
50%
 93rd percentile
100
Jul 21
Aug 21
Sep 21
Oct 21
Nov 21
Dec 21
Jan 22
Feb 22
Mar 22
Apr 22
May 22
Jun 22
Jul 22
Aug 22
Sep 22
Oct 22
Nov 22
Dec 22
Jan 23
Feb 23
Mar 23
Apr 23
May 23
Jun 23
Jul 23
Aug 23
Sep 23
Oct 23
Nov 23
Dec 23
Jan 24
Feb 24
Mar 24
Apr 24
May 24
Jun 24
250%
200%
150%
100%
50%
0%
-50%
Paladin
General Mining Peer Group
International Uranium Peers
TABLE 7  FY2022 LTI Performance Outcomes
PALADIN ENERGY ANNUAL REPORT 2024
72

Remuneration Report (Audited)
FY2023 LTI (partially vested)
Please refer to the Company’s FY2023 Annual Report for details on the Performance Rights granted under the LTI Plan on 1 July 2022 for 
FY2023. The Performance Period for the FY2023 LTIP (FY2023 – LTI) is three years and performance will be assessed on 1 July 2025.
In FY2023, under exceptional circumstances, the Board determined that 30% of the total FY2023 LTI award should be granted subject to 
service conditions only (FY2023 LTI – Retention Rights). At the time of the FY2023 LTI grant, the Company was in Care and Maintenance 
with no immediate cash flow and about to commence the LHM Restart Project and a portion of this grant was structured to secure 
Executive KMP in a highly competitive market. During this time, Executive KMP salaries were below industry benchmarks, and a formalised 
short-term incentive plan had not been implemented. An independent assessment confirmed the appropriateness of the structure of this 
LTI grant within this specific context. 
The Board believes that the structure of the FY2023 LTI represented an appropriate mechanism to retain key capability essential in 
delivering the Company's strategy and long-term shareholder value. Importantly, this unique structure was designed as a temporary  
one-off measure and does not form part of the remuneration framework for Executive KMP from FY2024.
The FY2023 LTI – Retention Rights as detailed above vested in December 2023 and are reported in Table 15.
Realised earnings received by Executive KMP in FY2024 (unaudited)
Realised remuneration represents the actual compensation received by Executive KMP for the financial year and uses non-IFRS 
information to offer our shareholders a clearer insight into the compensation Executive KMP have received and the performance of Paladin 
over FY2024.
The FY2024 realised pay for Executive KMP includes:
•	 Fixed Remuneration earned in FY2024;
•	 Non-monetary benefits and other cash earned in FY2024;
•	 STI earned in FY2024 as a result of business performance (payable in September 2024);
•	 FY2023 LTI – Retention Rights that vested on 31 December 2023; and 
•	 FY2022 Commencement Rights that vested on 27 September 2023.
Executive remuneration details prepared in accordance with statutory requirements and the Accounting Standards are presented in 
Table 9 of this report.
The realised earnings for Executive KMP for FY2024 represents actual compensation received.
TABLE 8  FY2024 Realised Pay for Executive KMP
Executive
Fixed 
Remuneration 
US$
Other1
US$
STI
US$
Commencement 
Rights
US$
LTI
US$
Total Realised Remuneration
US$ 
A$   
Mr Ian Purdy
488,220
-
521,419
-
-
1,009,640
1,540,660
Mr Paul Hemburrow
317,835
-
282,873
-
159,2492
759,956
1,159,206
Ms Anna Sudlow
304,728
2,408
271,208
-
151,5862
729,931
1,113,410
Mr Alex Rybak
252,302
-
224,549
298,5393
131,3512
906,740
1,400,214
1	 'Other' includes payment of insurance premium.
2	 FY2023 LTI – Retention Rights are valued using the 5-day VWAP preceding 26 February 2024, being the first trading day after a blackout period commencing  
1 January 2024 was lifted.
3	 Commencement Rights for Mr Alex Rybak are valued using the share price on 20 October 2023 being the first trading date after a blackout period commencing 1 October 2023 was 
lifted.
PALADIN ENERGY ANNUAL REPORT 2024
73

Executive KMP Statutory Remuneration Disclosures
The following table shows details of the remuneration expense recognised for the Group’s Executive KMP for the current and previous financial year measured in accordance with the 
requirements of the accounting standards. These details differ from the actual payments made to Executive KMP for the reporting period that are set out in Table 8.
1	 For accounting purposes, the fair value at grant date is shown above in accordance with AASB 2 Share Based Payment. The Performance Rights subject to TSR conditions have been independently valued using a hybrid employee share option pricing 
model which uses a correlated simulation that simultaneously calculates the returns from the Company’s and the individual peer group companies’ TSR (for Peer Groups 1 and 2) on a risk-neutral basis as at the vesting date with regards to the remaining 
Performance Measurement period. The Performance Rights subject to non-market conditions have been valued with reference to the Paladin share price on grant date. The fair value of Performance Rights granted are set out in Table 17. The fair value at 
the grant date represents the maximum possible total fair value of the shares. The minimum value of unvested shares is $Nil.
2	 Includes 4 weeks annual leave per annum.
3	 Appointed 1 February 2023.
4	 Insurance.
5	 Mr Oram ceased to be Executive KMP on 30 June 2023. 
6	 Mr Clements resigned 31 July 2022
The compensation table has been presented in US$, Paladin’s functional and presentation currency. The A$ value has also been shown as this is the most relevant comparator between 
years, given that 100% of Executive KMP contracts for services were denominated in A$ and this eliminates the effects of fluctuations in the US$ and A$ exchange rate. Exchange rate 
used is the average for the 2024 financial year US$1 = A$1.525950 (2023 financial year US$1 = A$1.489580).
TABLE 9  Executive KMP remuneration for FY2024 and FY2023 required under the Corporations Act
Remuneration Report (Audited)
Name
Year
Fixed Remuneration
Variable Remuneration1
Total
Total Performance Related           
Salary & Fees2
US$
Other
US$
Superannuation
US$
STI 
US$
PR 
US$
 
US$
A$
US$
%      
Ian Purdy 
2024
470,265
17,955
521,419
665,908
1,675,547
2,556,801
1,187,327
70.9
2023
375,945
-
16,980
-
461,146
854,071
1,272,207
461,146
54.0
Paul Hemburrow3
2024
299,879
17,955
282,873
335,093
935,800
1,427,984
617,966
66.0
2023
106,294 
- 
11,161
-
97,005 
214,460 
319,455 
97,005 
45.2 
Anna Sudlow 
2024
286,773
2,4084
17,955
271,208
352,095
930,440
1,419,805
623,303
67.0
2023
242,015 
4,7694
16,980
-
264,837 
528,601 
787,393 
264,386 
50.1 
Alex Rybak
2024
234,346
17,955
224,549
329,989
806,840
1,231,197
329,989
68.7
2023
207,441 
- 
18,180
-
368,610 
594,231 
885,155
368,610 
62.0 
Jess Oram5
2023
207,441 
16,980
-
368,610 
593,031
883,367
554,538
62.2
Jonathon Clements6
2023
19,021
13,168
1,997
-
-
34,168
50,923
-
0.0
Total Executive KMP 
remuneration expensed
2024
1,291,264
2,408
71,821
1,300,049
 1,683,085
4,348,627
6,635,787
1,683,085
2023
1,158,157
17,937
82,278
-
1,560,208
2,818,580
4,198,500
1,560,208
PALADIN ENERGY ANNUAL REPORT 2024
74

Non-Executive Director Remuneration 
Overview 
Paladin aims to reward Non-Executive Directors fairly and responsibly with regards to the demands which are made on them, and their 
responsibilities. The Committee reviews and makes recommendations to the Board with respect to Non-Executive Director fees and 
may seek advice from external consultants to help review Non-Executive Director fees.
Non-Executive Directors are paid within an aggregate fee pool limit of A$1,200,000 (US$805,596) as approved by shareholders at the 
2008 Annual General Meeting. 
All Non-Executive Directors enter into a service agreement with the company in the form of a letter of appointment. The letter of 
appointment summarises the Board policies, terms of appointment, including remuneration relevant to the office of the director of the 
Company. 
Non-Executive Director Remuneration Structure
Having last been externally benchmarked in 2021, Non-Executive Director remuneration was reviewed in May 2023 as part of the 
independent review of the remuneration framework. Following this review, the Board approved the following changes from 1 July 2023, 
reflective of both the market rates for comparable companies and the increasing time commitment required of the Non-Executive 
Directors:
•	 An increase in fees for the Board Chair; and 
•	 The introduction of committee fees in line with market practice. 
Committee fees will not be paid to the Chair of the Board. 
The FY2024 Non-Executive Director fees are detailed in Table 10 below (inclusive of superannuation). The fees include the increase in 
the statutory superannuation guarantee contribution rate on 1 July 2023 from 10.5% to 11.0%.
Non-Executive Directors are not entitled to retirement benefits other than statutory superannuation in accordance with applicable 
laws, nor do they participate in performance-based incentive plans. There is no entitlement to compensation on termination of Non-
Executive Directorships.
Paladin’s Constitution provides for additional compensation to be paid if any of the Directors are called upon to perform extra services 
or make any special exertions on behalf of Paladin or the business of Paladin (Additional Fees). Paladin may compensate such Director 
in accordance with such services or exertions, and such compensation may be either in addition to or in substitution for the Directors’ 
fees referred to above. 
Directors are entitled to be reimbursed for reasonable expenses incurred whilst engaged on Paladin business. Payments for, or 
reimbursement of, expenses, and any Additional Fees are not included in the fee pool limit.
TABLE 10  FY2024 Non-Executive Director fees inclusive of superannuation (A$)
1	 Inclusive of committee work
Fees (inclusive of superannuation) paid for the year to 30 June 2024 total US$688,096 (A$1,050,000).
Remuneration Report (Audited)
FY2024
FY2023
Base Fees
Non-Executive Chair1
$200,000
$150,000
Non-Executive Directors
$100,000
$100,000
Committee Fees
Committee Chair
$20,000
Nil
Committee Member
$10,000
Nil
PALADIN ENERGY ANNUAL REPORT 2024
75

FY2024 Non-Executive Director statutory remuneration table
The statutory disclosures required under the Corporations Act 2001 (Cth) and in accordance with the Accounting Standards are set out 
in Table 11 below: 
TABLE 11  Compensation of Non-Executive Directors 
Non-Executive Directors
Year
Base Fees 
US$
Committee 
Fees
Retirement Benefits
Total
Superannuation 
US$
US$
A$4    
Cliff Lawrenson  
2024  
118,077
-
12,989
131,066
200,000 
2023  
91,131
-
9,569
100,700
150,000 
Peter Main  
2024
59,039
11,808
7,793
78,640
120,000
2023 
46,590
-
20,543
67,133
100,000 
Peter Watson1
2024  
118,077 
17,712
14,937
150,726
230,000 
2023  
121,507
-
12,758 
134,265
200,000
Melissa Holzberger
2024  
59,039 
11,808
7,793
78,640
120,000 
2023  
60,754
-
6,379
67,133
100,000 
Joanne Palmer  
2024  
59,039 
17,712
8,443
85,193
130,000 
2023  
60,754
-
6,379
67,133
100,000 
Jon Hronsky OAM2
2024
59,039 
11,808
7,793
78,640
120,000 
2023
17,525
-
1,840
19,365
28,846
Lesley Adam3
2024 
59,039 
17,712
8,443
85,613
130,000 
2023
6,991
-
734
7,725
11,507
Total Non-Executive  
Director remuneration 
2024 
531,348
88,558
68,190
688,096
1,050,000
2023 
405,252
-
58,202 
463,454 
690,353 
1	 In FY2022, Peter Watson was requested by the Board to provide additional oversight to the Langer Heinrich Mine Restart Project and a variation to amend his directors’ fees from 
A$100,000 to A$200,000, on an arms-length and commercial basis, was approved by the Board effective 1 April 2022. The Board considered that these services are unique, needed, 
limited in nature and the Board considers that they are in the best interests of shareholders. This arrangement will continue until 31 August 2024.
2	 Appointed 20 March 2023  
3	 Appointed 22 May 2023 
4	 Compensation to Non-Executive Directors are made in Australian dollars.
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
76

Grant Date
Performance  
testing date
Expiry date
No.  
granted
Exercise 
price
Value per 
PR at grant 
date
Performance 
achieved
%  
Vesting
7 September 20211
27 September 2023
27 September 2026
50,000
A$0.00
A$8.25
Retention based
100%
3 November 20212
30 June 2024
3 November 2026
158,085
A$0.00
A$7.05
93rd percentile
100%
3 November 20213
30 June 2024
3 November 2026
158,085
A$0.00
A$7.66
87th percentile
100%
28 September 20224
31 December 2023
28 September 2027
36,138
A$0.00
A$7.35
Retention based
100%
28 September 20225
30 June 2025
28 September 2027
116,723
A$0.00
A$6.31
To be determined
n/a
28 September 20226
30 June 2025
28 September 2027
116,723
A$0.00
A$6.29
To be determined
n/a
1 February 20237
31 January 2025
31 January 2028
50,000
A$0.00
A$6.05
To be determined
n/a
28 March 20238
31 December 2023
28 March 2028
20,340
A$0.00
A$6.05
Retention based
100%
28 March 20236
30 June 2025
28 March 2028
27,120
A$0.00
A$4.84
To be determined
n/a
28 March 20237
30 June 2025
28 March 2028
27,120
A$0.00
A$4.12
To be determined
n/a
17 October 20239
30 June 2026
17 October 2028
159,148
A$0.00
A$7.76
To be determined
n/a
17 October 202310
30 June 2026
17 October 2028
159,148
A$0.00
A$7.56
To be determined
n/a
1	 Commencement Rights issued to Mr Alex Rybak at the commencement of his employment. These Performance Rights were provided as a mechanism to attract and retain the 
Executive in the competitive labour market. These Performance Rights have a two-year vesting period and are contingent on continued employment with the Company. These 
Commencement Rights vested during FY2024.
2	 FY2022 LTI with the number of Performance Rights that vest based on the Total Shareholder Return (TSR) of Paladin over the Performance Period of three years, relative to the 
TSR performance of a nominated general mining peer group of 30 ASX listed companies in the ASX300 Resources Index (ex ASX100). These Performance Rights will vest in early 
FY2025.
3	 FY2022 LTI with the number of Performance Rights that vest based on the TSR of Paladin over the Performance Period of three years, relative to the TSR performance of a 
nominated peer group of international listed uranium focused companies. These Performance Rights will vest in early FY2025.
4	 Retention Rights issued to Mr Alex Rybak and Ms Anna Sudlow as part of FY2023 LTI – Retention Rights. These Retention Rights vested during FY2024.
5	 FY2023 LTI with the number of Performance Rights that vest based on the TSR of Paladin over the Performance Period of three years, relative to the TSR performance of a 
nominated peer group of 14 international uranium focused companies.
6	 FY2023 LTI with the number of Performance Rights that vest based on the TSR of Paladin relative to the performance of a nominated general mining peer group of 25 ASX listed 
companies in the ASX300.
7	 Commencement Rights were issued to Mr Paul Hemburrow at the commencement of his employment. These Performance Rights have a two-year vesting period and are 
contingent on continued employment with the Company.
8	 Retention Rights issued to Mr Paul Hemburrow as part of FY2023 LTI – Retention Rights.
9	 FY2024 LTI with the number of Performance Rights that vest based on the TSR of Paladin relative to the performance of the 25 companies the ASX 200 index (excluding ASX 50) 
and classed under the Energy sector or Metals & Mining Industry, excluding companies operating in Oil & Gas.
10	FY2024 LTI with the number of Performance Rights that vest based on the TSR of Paladin relative to the performance of a custom peer group inclusive of globally listed companies 
operating in the uranium extraction sector.
Additional statutory information  
In 2009, Paladin implemented an Employee Performance Share Rights Plan (the 2009 Employee Share Rights Plan) together with a 
Contractor Performance Share Rights Plan (the Contractor Rights Plan). These plans are referred to jointly as the Rights Plans and were 
reaffirmed by shareholders at the 2018 Annual General Meeting. The Rights Plans terms were amended and approved by shareholders 
at the 2020 and 2023 Annual General Meetings (2023 Employee Share Rights Plan). 
The Rights Plan is the mechanism under which Executive KMP have been awarded: 
•	 Long Term Incentive Plan Performance Rights (current incentive grant) 
•	 Performance Rights on commencement of employment 
•	 Share Appreciation Rights (previous incentive grant – no longer utilised for new incentive grants).
The following tables show the movements during the reporting period in shares and Performance Rights over ordinary shares in the 
Company held by each Executive KMP.
All equity transactions with Executive KMP have been entered into under terms and conditions no more favourable than those the 
Group would have adopted if dealing at arm’s length.
The terms, conditions and valuation of each grant of Performance Rights affecting remuneration in the current or a future reporting period 
are set out in Table 12 below.
Performance Rights Terms and Conditions  
TABLE 12  Compensation of Non-Executive Directors 
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
77

Grant Date
Vesting date
Expiry date
No.  
granted
Exercise price
Fair Value per 
SAR at grant 
date
Performance 
achieved
% Vested
1 July 2019
1 July 2020
1 July 2025
70,000
A$1.226
A$0.490
Retention based
100%
1 July 2019
1 July 2021
1 July 2026
70,000
A$1.226
A$0.638
Retention based
100%
1 July 2019
1 July 2022
1 July 2027
110,000
A$1.226
A$0.744
Retention based
100%
Reconciliation of Performance Based Remuneration
The number of Performance Rights provided as remuneration to Executives and capable of vesting into ordinary shares in the Company 
is shown in Table 15. The Performance Rights carry no dividend or voting rights. Subject to the terms set out in the offer, Performance 
Rights will vest and be automatically exercised into fully paid ordinary shares on a one-for-one basis as soon as practicable after the 
vesting conditions have been met.
Table 14 shows for each Executive the value of Performance Rights that were granted, vested and forfeited during FY2024. 
TABLE 14  Performance-based remuneration granted, exercised and forfeited during the year
2024
Performance Rights (US$)
Value granted1
Value vested
Value forfeited
Ian Purdy
618,963
-
-
Paul Hemburrow
335,791
159,2492
-
Anna Sudlow
321,944
151,5862
-
Alex Rybak
266,556
429,8893
-
1	 FY2024 LTI Plan – fair value on the date of grant.
2	 FY2023 LTI – Retention Rights. The value of the FY2023 Performance Rights is calculated using the 5-day VWAP preceding 26 February 2024, being the first trading day after a 
blackout period commencing 1 January 2024 was lifted.
3	 Comprises a combination of Commencement Rights and the FY2023 LTI – Retention Rights. The Commencement Rights vesting on 27 September 2023 were valued on 20 October 
2023 being the first trading date after a blackout period commencing 1 October 2024 was lifted. The value of the FY2023 LTI - Retention Rights are calculated using the 5-day 
VWAP preceding 26 February 2024, being the first trading day after a blackout period commencing 1 January 2024 was lifted. 
Share Appreciation Rights (SAR) Terms and Conditions   
The terms, conditions and valuation of each grant of Share Appreciation Rights affecting remuneration in the current or a future reporting 
period are set out in Table 13 below. 
TABLE 13  Share Appreciation Rights terms and conditions
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
78

The table below shows a reconciliation of Performance Rights held by each Executive KMP from the beginning to the end of FY2024.
TABLE 15  Reconciliation of Performance Rights (PR), Commencement Rights (CR) and Share Appreciation Rights (SAR) held by 
Executive KMP 
Name
Type of 
Right
Balance at the  
start of the year
Granted as 
compensation
Vested
Forfeited
Balance at the  
end of the year
Vested
Unvested
Number
Number
%
0
%
Vested not 
exercised 
Unvested
Ian Purdy
PR
-
300,1661
127,6612
-
-
-
-
-
427,827
Paul Hemburrow
PR
-
74,5813
69,2572
(20,340)4
30
-
-
-
123,498
Paul Hemburrow
CR
-
50,0005
-
-
-
-
-
-
50,000
Anna Sudlow
PR
-
153,0201
66,4012
(19,361)4
30
-
-
-
200,060
Anna Sudlow
SAR
250,0006
-
-
-
-
-
-
250,0006
-
Alex Rybak
PR
-
132,5671
54,9772
(16,777)4
30
-
-
-
170,767
Alex Rybak
CR
-
50,0007
-
(50,000)7
100
-
-
-
 -
1	 FY2022 LTI Performance Rights with a grant date 3 November 2021 as part of the FY2022 LTI which will be included in the FY2025 Remuneration Report and FY2023 LTI with  
a grant date 28 September 2022 
2	 FY2024 LTI Performance Rights with a grant date 17 October 2023 
3	 FY2023 LTI Performance Rights with a grant date 28 March 2023 
4	 FY2023 LTI - Retention Rights granted
5	 Commencement Rights with a grant date 28 March 2023
6	 FY2020 LTI Share Appreciation Rights with a grant date 1 July 2019
7	 Commencement Rights with a grant date 7 September 2021 
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
79

Movement in ordinary shares held by KMP   
The table below reconciles the movement during the reporting period in the number of ordinary shares in the Company held by  
Non-Executive Directors and Executive KMP for FY2024.
TABLE 16  Shareholdings
Name  
 Balance at the 
start of the year1 
Received during 
the year on the 
exercise of PR 
Received during 
the year on the 
exercise of SAR 
 Other changes 
during the year 
 Balance at  
the end  
of the year 
Non-Executive Directors 
Cliff Lawrenson  
223,514 
- 
-
- 
223,514
Peter Main  
409,460 
- 
-
- 
409,460
Peter Watson  
100,000 
- 
-
- 
100,000
Melissa Holzberger  
2,175 
- 
-
- 
2,175
Joanne Palmer  
2,173 
- 
-
- 
2,173
Jon Hronsky OAM  
- 
- 
-
- 
-
Lesley Adams  
- 
- 
-
10,0002 
10,000
Executive KMP 
Ian Purdy  
500,000 
- 
-
-
500,000
Paul Hemburrow  
- 
20,3401 
-
(10,170)3 
10,170
Anna Sudlow  
260,000 
19,3611 
-
(83,989)3
195,372
Alex Rybak  
- 
66,7771 
-
(33,000)3 
33,777
1	 The vesting of Performance Rights have a $Nil exercise price
2	 Share acquired through on market trade
3	 Shares disposed during the year
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
80

Related party transactions and additional disclosures   
None of the shares above are held nominally by the directors or any of the other KMP. 
No other KMP held shares during the years ended 30 June 2024 and 30 June 2023. 
Loans Given to Key Management Personnel  
Paladin does not offer any loan facilities to KMP. 
Other transactions with Key Management Personnel
In FY2022, Peter Watson was requested by the Board to provide additional oversight to the Langer Heinrich Mine Restart Project and a 
variation to amend his directors’ fees from A$100,000 to A$200,000, on an arms-length and commercial basis, was approved by the Board 
effective 1 April 2022. The Board considered that these services are unique, needed, limited in nature and the Board considers that they 
are in the best interests of shareholders. This arrangement will continue until 31 August 2024.
During FY2024, Paladin paid Dr Jon Hronsky OAM US$Nil (FY2023 – US$8,843 (A$13,340)) in relation to the provision of geological 
consulting services through his company, Western Mining Services Pty Ltd which have been paid on an arms-length and commercial basis 
and were approved by the Board. The payment made is in addition to compensation of Non-Executive Directors as disclosed in Table 11. 
TABLE 17  Details of Executive KMP Performance Rights
Type of Equity   
Grant Date
Vesting Date
Not vested
Fair 
Value in 
A$
Vested 
in 
FY20242
% of 
total 
vested
Lapsed  
in  
FY2024
Ian Purdy
FY2024 LTI Performance Rights
17 October 2023
30 June 2026
127,661
977,882
-
-
-
FY2023 LTI Performance Rights
28 September 2022 30 June 2025
137,076
863,583
-
-
-
FY2022 LTI Performance Rights
3 November 2021
30 June 20241
163,090
1,199,524
-
-
-
Paul Hemburrow
FY2024 LTI Performance Rights
17 October 2023
30 June 2026
69,257
530,506
-
-
-
FY2023 LTI Performance Rights
28 March 2023
30 June 2025
54,241
242,996
-
-
-
28 March 2023
31 December 2023
-
-
20,3402
30%
-
FY2023 LTI Commencement Rights 1 February 2023
31 January 2025
50,000
302,500
-
-
-
Anna Sudlow
FY2024 LTI Performance Rights
17 October 2023
30 June 2026
66,401
508,630
-
-
-
FY2023 LTI Performance Rights
28 September 2022 30 June 2025
51,630
325,272
-
-
-
28 September 2022 31 December 2023
-
-
19,3612
30%
-
FY2022 LTI Performance Rights
3 November 2021
30 June 20241
82,029
603,326
-
-
-
Alex Rybak
FY2024 LTI Performance Rights
17 October 2023
30 June 2026
54,977
421,124
-
-
-
FY2023 LTI Performance Rights
28 September 2022 30 June 2025
44,739
281,851
-
-
-
28 September 2022 31 December 2023
-
-
16,7772
30%
-
FY2022 LTI Performance Rights
3 November 2021 
30 June 20241
71,051
522,574
-
-
-
Commencement Rights
27 September 2021
27 September 2023
-
-
50,000
100%
-
1	 FY2022 LTI Performance Rights Performance Period. These Performance Rights will vest in early FY2025.
2	 30% of the total FY2023 LTI award granted subject to service conditions only (FY2023 LTI – Retention Rights).
Remuneration Report (Audited)
PALADIN ENERGY ANNUAL REPORT 2024
81

 
PricewaterhouseCoopers, ABN 52 780 433 757  
Brookfield Place, Level 15, 125 St Georges Terrace, PERTH WA 6000, GPO Box D198, PERTH WA 6840 
T: +61 8 9238 3000, F: +61 8 9238 3999, www.pwc.com.au  
Liability limited by a scheme approved under Professional Standards Legislation. 
Auditor’s Independence Declaration 
As lead auditor for the audit of Paladin Energy Ltd for the year ended 30 June 2024, I declare that to 
the best of my knowledge and belief, there have been:  
(a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in 
relation to the audit, and 
(b) no contraventions of any applicable code of professional conduct in relation to the audit. 
This declaration is in respect of Paladin Energy Ltd and the entities it controlled during the period. 
  
Justin Carroll 
Perth 
Partner 
PricewaterhouseCoopers 
  
29 August 2024 
PALADIN ENERGY ANNUAL REPORT 2024
82

PALADIN ENERGY ANNUAL REPORT 2024
83

Financial 
Report
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
84

Consolidated Income Statement	
86
Consolidated Statement of Comprehensive Income 
87
Consolidated Statement of Financial Position	
88
Consolidated Statement of Changes in Equity	
89
Consolidated Statement of Cash Flows	
90
Notes to the Consolidated Financial Statements	
91
Financial Report
PALADIN ENERGY ANNUAL REPORT 2024
85

Consolidated Income Statement
For the year ended 30 June 2024
Notes
2024 
US$’000
2023 
US$’000
Revenue
Revenue
9
-
-
Cost of sales
10
-
-
Gross profit
-
-
Other income
10
2,339
4,696
Other losses
10
-
(512)
Net foreign exchange (loss)/gain
10
(1,943)
584
General and administration costs
10
(20,577)
(17,464)
Other gains
10
69
-
Impairment reversal on stockpile
10
92,195
-
Profit/(loss) before interest and tax
72,083
(12,696)
Finance costs
10
(12,085)
(14,362)
Profit/(loss) before income tax from continuing operations
59,998
(27,058)
Income tax expense
11
-
-
Profit/(loss) after tax from continuing operations
59,998
(27,058)
Attributable to:
Non-controlling interests
6,370
(16,486)
Members of the parent
53,628
(10,572)
Profit/(loss) after tax
59,998
(27,058)
Profit/(loss) per share (US cents)
Profit/(loss) after tax from operations attributable to ordinary equity holders of the Company
-  continuing operations, basic (US cents)
12
17.9
(4.0)
-  continuing operations, diluted (US cents)
12
17.9
(4.0)
The above Consolidated Income Statement should be read in conjunction with the accompanying notes.
PALADIN ENERGY ANNUAL REPORT 2024
86

Notes
2024 
US$’000
2023 
US$’000
Profit/(loss) after tax
59,998
(27,058)
Other comprehensive income
-
-
Items that may be subsequently reclassified to profit or loss
Foreign currency translation
7
(1,184)
(870)
Income tax on items of other comprehensive income
-
-
Items that will not be subsequently reclassified to profit or loss:
Changes in the fair value of equity investments at fair value  
through other comprehensive income
350
363
Other comprehensive loss for the year, net of tax
(834)
(507)
Total comprehensive income/(loss) for the year
59,164
(27,565)
Total comprehensive income/(loss) attributable to:
Non-controlling interests
6,370
(16,486)
Members of the parent
52,794
(11,079)
59,164
(27,565)
The above Consolidated Statement of Comprehensive Income should be read in conjunction with the accompanying notes.
Consolidated Statement of Comprehensive Income
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
87

Consolidated Statement of Financial Position
As at 30 June 2024
Notes
2024 
US$’000
2023 
US$’000
ASSETS
Current assets
Cash and cash equivalents
5a
48,858
126,636
Restricted cash 
5b
4,322
1,014
Trade and other receivables
14
7,956
2,756
Prepayments
15
13,045
11,127
Inventories
16
125,268
5,646
Financial assets - held for sale
17
-
1,590
TOTAL CURRENT ASSETS
199,449
148,769
Non-current assets
Trade and other receivables
14
631
355
Inventories
16
8,317
-
Right-of-use assets
18
1,892
817
Property, plant and equipment
18
230,186
197,928
Mine development
19
67,732
22,064
Exploration and evaluation expenditure
20
100,732
95,321
Intangible assets
21
12,843
7,793
TOTAL NON-CURRENT ASSETS
422,333
324,278
TOTAL ASSETS
621,782
473,047
LIABILITIES
Current liabilities
Trade and other payables
22
15,122
9,094
Interest bearing loans and borrowings
6
33,006
-
Lease liabilities
23
658
159
Provisions
24
803
331
TOTAL CURRENT LIABILITIES
49,589
9,584
Non-current liabilities
Interest bearing loans and borrowings
6
132,344
89,708
Lease liabilities
23
1,342
622
Provisions
24
40,692
38,049
TOTAL NON-CURRENT LIABILITIES
174,378
128,379
TOTAL LIABILITIES
223,967
137,963
NET ASSETS
397,815
335,084
EQUITY
Contributed equity
7
2,649,226
2,646,644
Reserves
7
(69,681)
(70,004)
Accumulated losses 
(2,107,752)
(2,169,066)
Parent interests
471,793
407,574
Non-controlling interests
(73,978)
(72,490)
TOTAL EQUITY
397,815
335,084
The above Consolidated Statement of Financial Position should be read in conjunction with the accompanying notes.
PALADIN ENERGY ANNUAL REPORT 2024
88

Consolidated Statement of Changes in Equity
For the year ended 30 June 2024
Contributed 
Equity  
(Note 7) 
Reserved 
Shares1 
(Note 7) 
Reserves 
(Note 7) 
Accumulated 
Losses 
Attributable 
to  
Owners of 
the Parent 
Non- 
Controlling 
Interests 
Total 
US$’000
US$’000
US$’000
US$’000
US$’000
US$’000 US$’000
Balance at 30 June 2022
2,645,778
-
(71,917) (2,160,834)
413,027
(54,615)
358,412
Loss for the year 
-
-
-
(10,572)
(10,572)
(16,486)
(27,058)
Other comprehensive loss 
-
-
(507)
-
(507)
-
(507)
Total comprehensive loss for the year net of tax
-
-
(507)
(10,572)
(11,079)
(16,486)
(27,565)
Other equity transactions
Share-based payments
866
-
3,226
-
4,092
-
4,092
Transfer of gain on disposal of equity investments 
at fair value through other comprehensive income 
to retained earnings
-
-
(806)
806
-
-
-
Earn in of 5% share of Michelin Project
-
-
-
1,534
1,534
(1,534)
-
Transactions with owners in their capacity as owners 
-
-
-
-
-
145
145
Balance at 30 June 2023
2,646,644
- (70,004) (2,169,066)
407,574
(72,490) 335,084
Profit for the year
-
-
-
53,628
53,628
6,370
59,998
Other comprehensive loss
-
-
(742)
(92)
(834)
-
(834)
Total comprehensive income/(loss)  
for the year net of tax
-
-
(742)
53,536
52,794
6,370
59,164
Other equity transactions
Share-based payments
-
-
3,577
-
3,577
-
3,577
Transfer in of 25% share of Michelin Project 
-
-
-
7,859
7,859
(7,859)
-
Foreign exchange revaluation reserves
74
(75)
(1)
1
-
Vesting Performance Rights
2,585
-
(2,586)
-
(1)
-
(1)
Transactions with owners as owners
-
-
-
(6)
(6)
-
(6)
Shares issued to employee share trust
4,384
(4,387)
-
-
(3)
-
(3)
Balance at 30 June 2024 
2,653,613
(4,387)
(69,681)
(2,107,752)
471,793
(73,978)
397,815
The above Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying notes.
1	
Reserved shares are held in relation to an employee share trust.
PALADIN ENERGY ANNUAL REPORT 2024
89

Consolidated Statement of Cash Flows
For the year ended 30 June 2024
Notes
2024 
US$’000
2023 
US$’000
CASH FLOWS FROM OPERATING ACTIVITIES
Receipts from customers
-
-
Payments to suppliers and employees1,2
(46,263)
(13,630)
Transfer to restricted cash
(3,259)
-
Other income
50
81
Interest received
2,421
4,174
Interest paid
(1,065)
-
Tax paid
-
-
NET CASH OUTFLOW FROM OPERATING ACTIVITIES
13
(48,116)
(9,375)
CASH FLOWS FROM INVESTING ACTIVITIES
Payments for property, plant and equipment
(2,187)
(734)
Capitalised exploration expenditure
(5,922)
(1,910)
LHM Restart Project
(79,294)
(36,955)
Pre-production costs and capitalised mine development
(9,195)
-
Proceeds from sale of subsidiary
-
3,000
Proceeds from sale of investments3,4
1,950
805
NET CASH OUTFLOW FROM INVESTING ACTIVITIES
(94,648)
(35,794)
CASH FLOWS FROM FINANCING ACTIVITIES
Proceeds from interest bearing liabilities5
70,000
-
Transaction costs associated with interest bearing liabilities
(4,083)
-
Funds received from Shareholder6
-
85
NET CASH INFLOW FROM FINANCING ACTIVITIES
65,917
85
NET (DECREASE) IN CASH AND CASH EQUIVALENTS
(76,847)
(45,084)
Unrestricted cash and cash equivalents at the beginning of the financial year
126,636
177,066
Effects of exchange rate changes on cash and cash equivalents
(931)
(5,346)
UNRESTRICTED CASH AND CASH EQUIVALENTS  
AT THE END OF THE FINANCIAL YEAR
5a
48,858
126,636
The above Consolidated Statement of Cash Flows should be read in conjunction with the accompanying notes. 
1	
Includes transfer to restricted cash for operational purposes of US$3.35M
2	
In FY2023 the Langer Heinrich Mine was in Care and Maintenance and in FY2024 commenced production
3	
During FY2024 the Company sold 13M shares in Lotus Resources Ltd
4	
During FY2023 the Company sold 390k shares in Global Atomic Corporation
5	
During FY2024 the company drew down US$70M from the Syndicated Debt Facility split between the Term Facility (US$50M) and the Revolving Facility (US$20M)
6	
Funds received by way of loan from CNNC Overseas Limited to Langer Heinrich Uranium Pty Ltd to fund Care and Maintenance activities.
PALADIN ENERGY ANNUAL REPORT 2024
90

Notes to the Consolidated Financial Statements
For the year ended 30 June 2024
BASIS OF PREPARATION	
92
Note 1.	
Corporate Information	
92
Note 2.	
Structure of the Financial Report	
92
Note 3.	
Basis of Preparation	
92
SEGMENT REPORTING	
94
Note 4.	
Segment Information	
94
CAPITAL STRUCTURE	
	
97
Note 5a.	 Cash and Cash Equivalents	
97
Note 5b	
Restricted Cash	
	
97
Note 6.	
Interest Bearing Loans and Borrowings	
97
Note 7.	
Contributed Equity and Reserves	
99
Note 8.	
Financial Risk Management	
101
PERFORMANCE FOR THE YEAR	
108
Note 9.	
Revenue	
108
Note 10.	 Income and Expenses	
109
Note 11.	
Income and Other Taxes	
110
Note 12.	 Earnings Per Share	
	
112
Note 13.	 Reconciliation of Earnings After Income Tax to Net Cash Flow from Operating Activities	
113
OPERATING ASSETS AND LIABILITIES	
114
Note 14.	 Trade and Other Receivables	
114
Note 15.	 Prepayments	
115
Note 16.	 Inventories	
115
Note 17.	
Financial Assets – Held for Sale	
116
Note 18.	 Property, Plant and Equipment	
117
Note 19.	 Mine Development	
119
Note 20.	 Exploration and Evaluation Expenditure	
120
Note 21.	 Intangible Assets	
121
Note 22.	 Trade and Other Payables	
122
Note 23.	 Lease Liabilities	
122
Note 24.	 Provisions	
123
Note 25.	 Employee Share Rights Plan	
124
OTHER NOTES	
127
Note 26.	 Key Management Personnel	
127
Note 27.	 Auditors’ Remuneration	
128
Note 28.	 Commitments and Contingencies	
128
Note 29.	 Related Parties	
129
Note 30.	 Group Information	
130
Note 31.	 Events after the Balance Date	
131
Note 32.	 New Accounting Standards and Interpretations	
132
PALADIN ENERGY ANNUAL REPORT 2024
91

Notes to the Consolidated Financial Statements
For the year ended 30 June 2024
BASIS OF PREPARATION
NOTE 1.	 CORPORATE INFORMATION
The Consolidated Financial Report of the Group consisting of Paladin Energy Ltd (Paladin or the Company) and the entities it controlled 
at the end of, or during the year ended 30 June 2024 was authorised for issue by the Directors on 28 August 2024.
The Company is incorporated under the laws of Australia with a primary share market listing on the Australian Securities Exchange 
(ASX) and is also listed on the Namibian Stock Exchange (NSX). The Company also trades on the OTCQX market in the United States 
of America. The Group’s principal place of business is Level 11, 197 St Georges Terrace, Perth, Western Australia. The nature of the 
operations and principal activities of the Group are described in the Operating and Financial Review (unaudited) on pages 12 to 27.
NOTE 2.  STRUCTURE OF THE FINANCIAL REPORT
The Notes to the Consolidated Financial Statements have been grouped into six key categories, which are summarised as follows:
Basis of Presentation
This section sets out the Group’s material accounting policies that relate to the financial statements as a whole. Where an accounting 
policy is specific to one note, the policy is described in the note to which it relates. Accounting policies determined not material are not 
included in the financial statements.
Segment Reporting
This section compares performance across operating segments.
Capital Structure
This section outlines how the Group manages its capital and related financing costs.
Performance for the Year
This section focuses on the results and performance of the Group. This covers both profitability and the resultant return to 
shareholders via earnings per share combined with cash generation.
Operating Assets and Liabilities
This section shows the assets used to generate the Group’s trading performance and the liabilities incurred as a result. Liabilities 
relating to the Group’s financing activities are addressed in the Capital Structure section.
Other Notes
This section deals with the remaining notes that do not fall into any of the other categories.
NOTE 3.  BASIS OF PREPARATION
Introduction and Statement of Compliance
The Financial Report is a general-purpose Financial Report, which has been prepared in accordance with the requirements of the 
Corporations Act 2001, Australian Accounting Standards and other authoritative pronouncements of the Australian Accounting 
Standards Board (AASB).
The Financial Report complies with International Financial Reporting Standards (IFRS) as issued by the International Accounting 
Standards Board (IASB). The Financial Report has also been prepared on a historical cost basis unless otherwise stated in the notes 
to the financial statements. Where necessary, comparatives have been reclassified and repositioned for consistency with current year 
disclosures. For the purposes of preparing the consolidated financial statements, the Company is a for-profit entity.
The Financial Report is presented in US dollars and all values are rounded to the nearest thousand dollars (US$1,000) unless otherwise 
stated under the option available to the Company under Australian Securities and Investments Commission (ASIC) Corporations 
(Rounding in Financial/Directors’ Reports) Instrument 2016/191. The Company is an entity to which the instrument applies.
The financial statements presents the figures of the consolidated entity, unless otherwise stated.
Changes in Accounting Policies
The accounting policies adopted have been consistently applied to all the years presented, unless otherwise stated.
Certain prior year amounts have been reclassified for consistency with the current year presentation. These reclassifications had no effect 
on the reported results of the Group.
PALADIN ENERGY ANNUAL REPORT 2024
92

The Group has adopted all applicable new and amended Australian Accounting Standards and AASB Interpretations effective from 
1 July 2023.
Certain new accounting standards, amendments to accounting standards and interpretations have been published that are not 
mandatory for 30 June 2024 reporting periods and have not been early adopted by the Group. These standards, amendments or 
interpretations are not expected to have a material impact on the entity in the current or future reporting periods and on foreseeable 
future transactions (refer Note 32).
Basis of Consolidation
The consolidated financial statements comprise the financial statements of Paladin Energy Ltd and its subsidiaries as at 30 June 2024 
(the Group).
Subsidiaries are all entities over which the Group has control. The Group controls an entity where the Group is exposed to, or has 
rights to, variable returns from its involvement with the entity and has the ability to affect those returns through its power to direct 
the activities of the entity. Subsidiaries are fully consolidated from the date on which control is transferred to the Group. They are 
deconsolidated from the date that control ceases. The acquisition method of accounting is used to account for business combinations 
by the Group.
Assets, liabilities, income and expenses of a subsidiary acquired or disposed of during the year are included in the Statement of 
Comprehensive Income from the date the Group gains control until the date the Group ceases to control the subsidiary.
Non-controlling interests in the results and equity of subsidiaries are shown separately in the Consolidated Income Statement, 
Consolidated Statement of Comprehensive Income, Consolidated Statement of Changes in Equity and Consolidated Statement of 
Financial Position respectively.
Financial statements of foreign controlled entities presented in accordance with overseas accounting principles are adjusted to comply 
with Group policy and generally accepted accounting principles in Australia for consolidation purposes. Intercompany transactions, 
balances and unrealised gains on transactions between Group companies are eliminated. Unrealised losses are also eliminated unless 
the transaction provides evidence of an impairment of the transferred asset. Accounting policies of subsidiaries have been changed 
where necessary to ensure consistency with the policies adopted by the Group.
The Group treats transactions with non-controlling interests that do not result in a loss of control as transactions with equity owners of 
the Group. 
Foreign Currency Transactions and Translation
Functional and Presentation Currency
Both the functional and presentation currency of Paladin Energy Ltd is United States Dollars (USD). The Company determines the 
most appropriate functional currency for each entity within the Group and items included in the financial statements of each entity are 
measured using that functional currency. 
Transactions and Balances
Foreign currency transactions are converted into the functional currency using the exchange rates prevailing at the dates of the 
transactions. Foreign exchange gains and losses resulting from the settlement of such transactions and from the translation at year end 
exchange rates of monetary assets and liabilities denominated in foreign currencies are recognised in the Consolidated Statement of 
Comprehensive Income.
Group Companies
The majority of Group entities have a functional currency of US dollars which is consistent with the Group’s presentational currency. 
For all other Group entities, the functional currency has been translated into US dollars for presentation purposes as follows:
•	 Assets and liabilities are translated using exchange rates prevailing at the balance date
•	 Revenues and expenses are translated using average exchange rates prevailing for the Consolidated Income Statement year
•	 Equity transactions are translated at exchange rates prevailing at the dates of transactions. The resulting difference from translation 
is recognised in a foreign currency translation reserve.
The functional currency of individual subsidiaries reflects their operating environment.
NOTE 3.  BASIS OF PREPARATION (CONTINUED)
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
93

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
Onerous contracts
A provision for onerous contracts is recognised when the expected benefits to be derived by the Group from a contract are lower than 
the unavoidable cost of meeting the obligations under the contract. The provision is stated at the present value of the future net cash 
outflows expected to be incurred in respect of the contract.
Fair value hierarchy
To provide an indication of the reliability of the inputs used in determining fair value, the Group has classified its financial instruments 
into the three levels prescribed under the accounting standards.
•	 Level 1: The fair value of financial instruments traded in active markets (such as publicly traded derivatives and equity securities) is 
based on quoted market prices at the end of the reporting period
•	 Level 2: The fair value of financial instruments that are not traded in an active market is determined using valuation techniques that 
maximise the use of observable market data and rely as little as possible on entity-specific estimates. If all significant inputs required 
to fair value an instrument are observable, the instrument is included in level 2
•	 Level 3: If one or more of the significant inputs is not based on observable market data, the instrument is included in level 3.
Material Accounting Judgements, Estimates and Assumptions
The preparation of the Group’s consolidated financial statements requires management to make judgements, estimates and 
assumptions that affect the reported amounts of revenues, expenses, assets and liabilities, and the accompanying disclosures, and the 
disclosure of contingent liabilities. Uncertainty about these assumptions and estimates could result in outcomes that require a material 
adjustment to the carrying amount of assets or liabilities affected in future periods.
Areas involving significant estimates or judgements are:
•	 Reversal of inventory impairment - Note 16
•	 Assessment of carrying values of property, plant and equipment, mine development costs, exploration and evaluation expenditure 
and intangible assets associated with the Langer Heinrich Mine - Notes 18 to 21
•	 Estimated fair value of certain financial liabilities - Note 6
•	 Environmental rehabilitation provision - Note 24
•	 Useful lives of property, plant and equipment - Note 18
•	 Useful lives of mine development costs and intangible assets associated with the Langer Heinrich Mine - Notes 19 and 21
Estimates and judgements are continually evaluated. They are based on historical experience and other factors, including expectations 
of future events including climate change related matters that may have a financial impact on the entity and that are believed to be 
reasonable under the circumstances. Paladin recognises the increasing global impacts of climate change, however the financial impact, 
and any other impacts, of climate change on our operations is currently expected to be minimal.
SEGMENT REPORTING
NOTE 4.  SEGMENT INFORMATION
Identification of Reportable Segments
The Company has identified its operating segments to be Exploration, Namibia and Australia, on the basis of the nature of the activity 
and geographical location and different regulatory environments. The main segment activity in Namibia is the production and sale 
of uranium from the mine located in this country’s geographic regions. The Australian segment includes the Company’s sales and 
marketing and corporate functions. The Exploration segment is focused on developing exploration and evaluation projects in Australia 
and Canada.
Discrete financial information about each of these operating segments is reported to the Group’s executive management team on at 
least a monthly basis.
The accounting policies used by the Group in reporting segments internally are the same as those contained in the accounts and in the 
prior period.
NOTE 3.  BASIS OF PREPARATION (CONTINUED)
Foreign Currency Translation (continued)
PALADIN ENERGY ANNUAL REPORT 2024
94

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
Corporate charges comprise non-segmental expenses such as corporate office expenses. A proportion of the corporate charges are 
allocated to Namibia and Exploration tenements with the balance remaining in Australia.
The following tables present revenue, expenditure and asset information regarding operating segments for the years ended 30 June 
2024 and 30 June 2023.
Year ended 30 June 2024
Exploration 
US$’000
Namibia 
US$’000
Australia 
US$’000
Consolidated 
US$’000
Revenue
-
-
-
-
Total consolidated revenue
-
-
-
-
Cost of sales
-
-
-
-
Gross profit
-
-
-
-
Other income
-
329
2,010
2,339
Other gains1
-
-
69
69
Impairment reversal2
-
92,195
-
92,195
Other expenses
(135)
(7,543)
(12,899)
(20,577)
Net foreign exchange gain3
-
-
-
(1,943)
Segment profit/(loss) before income tax and finance costs
(135)
84,981
(10,820)
72,083
Finance costs
-
(10,841)
(1,244)
(12,085)
Profit/(loss) before income tax
(135)
74,140
(12,064)
59,998
Income tax expense
-
-
-
-
Net profit/(loss) after tax
(135)
74,140
(12,064)
59,998
At 30 June 2024
Segment assets/total assets
101,212
481,662
38,9084
621,782
Australia 
US$’000
Canada 
US$’000
Namibia 
US$’000
Consolidated 
US$’000
Non-current assets by country
64,711
38,228
319,394
422,333
Additions to non-current assets by country (excluding financial assets)
Property, plant and equipment
103
246
76,265
76,614
Exploration and evaluation expenditure
476
5,872
-
6,348
Mine development
-
-
9,195
9,195
Right of use assets
1,246
-
448
1,694 
1	
Relates to gain on termination of lease
2	
Reversal of Impairment of Ore Stockpile
3	
Individual segment results are managed before the impact of foreign exchange differences
4	
Includes US$32.3M in cash and cash equivalents 
NOTE 4.  SEGMENT INFORMATION (CONTINUED)
PALADIN ENERGY ANNUAL REPORT 2024
95

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
Year ended 30 June 2023
Exploration 
US$’000
Namibia 
US$’000
Australia 
US$’000
Consolidated 
US$’000
Revenue
-
-
-
-
Total consolidated revenue
-
-
-
-
Cost of sales
-
-
-
-
Gross profit
 -
-
-
-
Other income
-
109
4,587
4,696
Other losses1
(7)
(505)
-
(512)
Other expenses
(441)
(9,406)
(7,617)
(17,464)
Net foreign exchange gain
-
-
-
584
Segment loss before income tax and finance costs
(448)
(9,802)
(3,030)
(12,696)
Finance costs
-
(6,813)
(7,549)
(14,362)
Loss before income tax
(448)
(16,615)
(10,579)
(27,058)
Income tax expense
-
-
-
-
Net loss after tax
(448)
(16,615)
(10,579)
(27,058)
At 30 June 2023
Segment assets/total assets
95,630
256,929
120,4873
473,047
Australia 
US$’000
Canada 
US$’000
Namibia 
US$’000
Consolidated 
US$’000
Non-current assets (excluding financial assets) by country
64,201
32,460
227,617
324,278
Additions to non-current assets by country (excluding financial assets)
Property, plant and equipment
334
13
34,650
34,997
Exploration and evaluation expenditure
473
1,470
-
1,943
Right of use assets
-
31
3
34
1	
Relates to assets demolished as part of the LHM Restart Project
2	
Individual segment results are managed before the impact of foreign exchange differences
3	
Includes US$116.8M in cash and cash equivalents
NOTE 4.  SEGMENT INFORMATION (CONTINUED)
PALADIN ENERGY ANNUAL REPORT 2024
96

CAPITAL STRUCTURE
The Group’s objectives when managing capital are to safeguard its ability to continue as a going concern, so that it can continue to 
provide returns to shareholders and benefits for other stakeholders and to maintain an efficient capital structure to reduce the cost 
of capital. Capital includes issued capital, and all other equity reserves attributable to the equity holders of the parent. The Group 
has US$48.9M cash on hand at 30 June 2024, and during the year entered into a Syndicated Debt Facility of US$150M to provide 
additional liquidity and flexibility as it recommences operations at the Langer Heinrich Mine (LHM) of which an amount of US$70M 
was drawn down at 30 June 2024.
In order to maintain or adjust the capital structure, the Group may issue new shares or sell assets to reduce debt.
The Group monitors capital on the basis of the level of return on capital and also the level of net cash/debt.
NOTE 5a.  CASH AND CASH EQUIVALENTS
2024 
US$’000
2023 
US$’000
Cash at bank and on hand
35,292
49,279
Short-term bank deposits
13,566
77,357
Total cash and cash equivalents
48,858
126,636
NOTE 5b.  RESTRICTED CASH
2024 
US$’000
2023 
US$’000
Restricted cash at bank
4,322
1,014
Total restricted cash
4,322
1,014
Restricted cash relates to cash provided by Langer Heinrich Uranium (Pty) Ltd as security to support the provision of guarantees for 
goods and services (including power and fuel) and for environmental rehabilitation.
Recognition and measurement
Cash and cash equivalents includes cash on hand, deposits held at call with financial institutions, other short term, highly liquid 
investments with original maturities of three months or less that are readily convertible to known amounts of cash and which are 
subject to an insignificant risk of changes in value, and bank overdrafts.
NOTE 6.  INTEREST BEARING LOANS AND BORROWINGS
2024 
US$’000
2023 
US$’000
Current
Borrowings - Syndicated Debt Facility
33,006
-
Total current interest bearing loans and borrowings
33,006
-
Non-Current
LHU’s loans from CNNC
97,317
89,708
Borrowings - Syndicated Debt Facility
35,027
-
Total non-current interest bearing loans and borrowings
132,344
89,708
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
97

Recognition and measurement
Loans and borrowings are initially recognised at fair value, net of transaction costs incurred. Loans and borrowings are subsequently 
measured at amortised cost. Any difference between the fair value (net of transaction costs) and the redemption amount is recognised 
in the Consolidated Income Statement over the period of the borrowings using the effective interest method. 
For the majority of any external borrowings, fair values are based on a discounted cash flow basis using quoted market prices (Level 1) 
or observable market data (Level 2) inputs in the fair value hierarchy.
The fair values of shareholder loans are based on discounted cash flows using a rate that the Company considers representative of a 
secured borrowing rate available in the market. These are classified as level 3 fair values in the fair value hierarchy due to the use of 
unobservable inputs, including Paladin’s own credit risk.
Borrowings are classified as current liabilities unless the Group has an unconditional right to defer settlement of the liability for at least 
12 months after the balance date.
Details of the fair value of the Group’s other interest bearing liabilities are set out in Note 8.
Syndicated Debt Facility
Paladin Energy Ltd executed a US$150M Syndicated Debt Facility (Debt Facility) on 24 January 2024, with two leading financial 
institutions, Nedbank Limited, acting through its Corporate and Investment Banking division (Nedbank CIB) and Macquarie Bank 
Limited, with Nedbank CIB acting as lead arranger and bookrunner. The Debt Facility comprises: 
•	 A US$100M amortising term loan (Term Facility) with a 5-year term, of which an amount of $50M was drawn down as at 30 June 
2024 (Note 8). The amounts drawn are repayable on quarterly instalments commencing from 31 March 2025; and 
•	 A US$50M revolving credit facility (Revolving Facility) with a 3-year term (with two options to extend by 12 months) of which an 
amount of $20M was drawn down as at 30 June 2024 (Note 8).
The Debt Facility of US$150M is secured by the assets of Paladin Finance Pty Ltd (PFPL) and Paladin Nuclear Pty Ltd (PNL), the shares 
in PFPL, PNL and Aurora Energy Ltd and the intercompany loans between Paladin Energy Ltd, those companies and Langer Heinrich 
Uranium (Pty) Ltd (LHU). Paladin Energy Ltd has complied with the financial covenants of its Debt Facility (Note 8). The fair values of 
the Debt Facility are not different from their carrying amounts since the interest payable on Debt Facility is priced at commercial market 
rates.
Interest is calculated for both the Term Facility and the Revolving Facility using the variable CME Term SOFR as of the specified time 
and for a period equal in length to the interest period of each loan, plus a margin under the Debt Facility Agreement.
Paladin Energy Ltd incurred total transaction costs of US$4.1M for the Debt Facility which was recognised as a transaction cost to 
the extent that the Company had drawn down under the Debt Facility as at 30 June 2024. An amount of US$2M is carried forward as 
prepayments (Note 15) and will be recognised as a transaction cost when the remaining balance of the Term Facility is drawn down. 
This is expected to occur within the next six months, as the production ramps up at the LHM.
LHU’s loans from CNNC
As part of the sale of the 25% interest in Langer Heinrich Mauritius Holdings Limited (LHMHL) in 2014 to CNNC Overseas Limited 
(CNNC), US$96M (representing 25%) of the intercompany shareholder loans owing by LHU to PFPL were assigned to CNNC under the 
same interest rate and conditions in place at the time. Subsequent to the sale in 2014 Paladin, PFPL and CNNC have provided further 
shareholder loans to LHU.
Under the Shareholders’ Agreement between CNNC, PFPL and LHU, each shareholder has agreed not to demand repayment of the 
loans without the prior written consent of the other shareholder. As neither CNNC nor PFPL can demand repayment, the repayment of 
the loans can be deferred. Repayment is dependent on LHU generating sufficient free cash flows to repay the loans. These loans have 
not been guaranteed by Paladin. Interest on shareholder loans is also deferred until there are sufficient cash flows. 
On consolidation, PFPL’s 75% share of the LHU intercompany shareholder loans are eliminated against the intercompany shareholder 
loans receivable recorded in PFPL and therefore, they do not appear on Paladin’s Consolidated Statement of Financial Position. As 
a result of the consolidation of 100% of LHU’s assets and liabilities, LHU’s shareholder loan liability to CNNC is recognised on the 
Consolidated Statement of Financial Position. 
On 1 January 2021, two shareholder loan facility agreements were extended with revised terms which included modifications to the 
term and interest rate of the loans. The revised terms of the shareholder loans reflected a mix of fixed and floating rate interest and 
interest free periods and considered that the LHM was in Care and Maintenance and not generating revenue. The shareholder loan 
terms may not be reflective of market conditions for external borrowings at this time. The face value of the loans remained the same. 
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
NOTE 6.  INTEREST BEARING LOANS AND BORROWINGS (CONTINUED)
PALADIN ENERGY ANNUAL REPORT 2024
98

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
NOTE 6.  INTEREST BEARING LOANS AND BORROWINGS (CONTINUED)
These revisions were considered a “substantial” modification under AASB 9 Financial Instruments, which required the original loan 
facilities to be “extinguished” and new loan facilities to be recognised at fair value. As a result, the book value of the total amount of the 
shareholder loans amounting to US$400.4M (owing to the Group and CNNC at 31 December 2020) was derecognised and “new” loans 
recognised at a fair value of US$247.6M at that date with the difference taken directly to equity as a shareholder contribution. After 
eliminations, the fair value of the CNNC share of the loan facilities was recognised at US$64.4M. The difference between the fair value 
and face value of the loans was recognised in equity and will be unwound over the term of the loans through the effective interest rate. 
At 30 June 2024 US$3.6M (2023: US$7.5M) accretion expense had been recognised on these loans. In July 2021, PFPL and CNNC 
entered into further loan agreements to advance funds to LHU to fund Care and Maintenance (PFPL and CNNC) and restart capital 
requirements (PFPL). These loans were also recognised at fair value. After eliminations, the difference between the fair value and 
face value of these loans of US$0.6M has also been recognised in equity and will be unwound over the term of the loans through the 
effective interest rate. At 30 June 2024 US$0.05M (2023 US$0.04M) accretion expense had been recognised on these loans.
NOTE 7.  CONTRIBUTED EQUITY AND RESERVES 
Contributed Equity
Number of Shares1
US$’000
2024
2023
2024
2023
Ordinary shares on issue
298,979,523
298,014,645
2,653,613
2,646,644
Reserved shares
(509,000)
-
(4,387)
-
Net contributed equity
298,470,523
298,014,645
2,649,226
2,646,644
Fully paid ordinary shares carry one vote per share and carry the right to dividends.
1	
On 9 April 2024, at the Company’s General Meeting, shareholders approved the consolidation of the Company’s issued capital on the basis that every 10 Shares be consolidated into 
1 Share. The table above relating to 2023, reflects the issued and fully paid shares on a post-consolidation basis.
Recognition and measurement
Ordinary Shares
Ordinary shares are classified as equity. Incremental costs directly attributable to the issue of new shares are shown in equity as a 
deduction, net of tax, from the proceeds of the new shares or options. Ordinary shares have no par value and the Company does not 
have a limited amount of authorised capital.
Fully paid ordinary shares carry one vote per share and carry the right to dividends.
Reserved Shares
Paladin Energy Ltd equity instruments which are issued and held by a trustee under the Paladin Employee Share Trust are classified as 
Reserved shares and are deducted from equity. No gain or loss is recognised in Other Comprehensive Income on the purchase, sale, 
issue or cancellation of the Group’s own equity instruments.
Movements in ordinary shares on issue
Date
Number of Shares
Issue Price 
A$
Exchange Rate 
US$: A$
Total 
US$’000
Balance at 30 June 2022
2,977,779,002
2,645,778
September 2022
PR exercised
100,000
-
-
59
September 2022
PR exercised
100,000
-
-
58
September 2022
SAR exercised
100,000
-
-
9
October 2022
PR exercised
1,095,000
-
-
649
October 2022
SAR exercised
196,828
-
-
13
November 2022
SAR exercised
500,000
-
-
43
December 2022
SAR exercised
100,000
-
-
16
January 2023
SAR exercised
126,875
-
-
11
April 2023
SAR exercised
29,662
-
-
5
May 2023
SAR exercised
19,080
-
-
3
Balance at 30 June 2023
2,980,146,447
2,646,644
PALADIN ENERGY ANNUAL REPORT 2024
99

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
NOTE 7.  CONTRIBUTED EQUITY AND RESERVES (CONTINUED)
Date
Number of 
Shares
Issue Price 
A$
Exchange 
Rate US$: A$
Total 
US$’000
Balance at 30 June 2023
2,980,146,447
2,646,644
July 2023
PR exercised
900,000
-
-
452
July 2023
PR exercised
82,500
-
-
45
October 2023
PR exercised
2,045,000
-
-
1,227
October 2023
SAR exercised
201,586
-
-
9
February 2024
PR exercised
1,269,650
-
-
852
February 2024
SAR exercised
10,964
-
-
-
April 2024
Share consolidation1
(2,686,190,532)
-
-
-
April 2024
Rounding1
4,908
-
-
-
June 2024
Shares issued to Employee Share Trust
509,000
12.94
1.502
4,384
Balance at 30 June 2024
298,979,523
2,653,613
1	
On 9 April 2024 the shareholders of Paladin approved consolidation of the Company’s issued capital on a ten for one basis. This included rounding differential of 4,908 shares.
Movement in reserved shares
Date
 
Number of 
Shares
Issue Price 
A$
Exchange 
Rate US$: A$
Total 
US$’000
Balance at 30 June 2023
-
-
-
-
June 2024
Shares issued to Employee Share Trust
(509,000)
12.94
1.502
(4,387)
Balance at 30 June 2024  
(509,000)
 
 
(4,387)
In May 2024, Paladin established the Paladin Employee Share Trust for the purpose of acquiring, holding and transferring shares 
in connection with equity based remuneration established by the Company for the benefit of participants in those plans. Paladin 
issued 509,000 shares to the trust during the year ended 30 June 2024 in relation to the 2022 Long Term Incentive Plan (LTIP), 2022 
Retention and Time based Performance Rights and 2023 Commencement and Retention Rights.
Reserves
Consolidation 
reserve
US$’000
Listed option 
application 
reserve
US$’000
Share based 
payment 
reserve
US$’000
Foreign 
currency 
translation 
reserve
US$’000
Financial 
assets 
at FVOCI 
reserve
US$’000
Premium on 
acquisition 
reserve
US$’000
Total 
US$’000
Balance at 30 June 2022
48,319
137
49,927
(184,386)
-
14,086
(71,917)
Share-based payments
-
-
3,226
-
-
-
3,226
Foreign currency translation
-
-
-
(870)
-
-
(870)
Revaluation of financial assets
-
-
-
-
(443)
-
(443)
Balance at 30 June 2023
48,319
137
53,153
(185,256)
(443)
14,086
(70,004)
Share-based payments
-
-
3,577
-
-
-
3,577
Vesting of Performance Rights
-
-
(2,586)
-
-
-
(2,586)
Foreign currency translation
-
-
-
(1,184)
-
-
(1,184)
Revaluation of held for sale investments
-
-
-
73
-
-
73
Revaluation of financial assets
443
443
Balance at 30 June 2024
48,319
137
54,144
(186,367)
-
14,086
(69,681)
PALADIN ENERGY ANNUAL REPORT 2024
100

Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
NOTE 7.  CONTRIBUTED EQUITY AND RESERVES (CONTINUED)
Nature and Purpose of Reserves
Consolidation reserve
This reserve is the result of the difference between the fair value and the net assets of a reduction of interest in controlled entities 
where Paladin retained control.
Listed option application reserve
This reserve consists of proceeds from the issue of listed options, net of expenses of issue. These listed options expired unexercised 
and no restriction exists for the distribution of this reserve.
Share-based payments reserve
This reserve is used to record the value of equity benefits provided to Directors, employees and consultants as part of their 
remuneration.
Foreign currency translation reserve
This reserve is used to record exchange differences arising on translation of the Group entities that do not have a functional currency 
of US dollars and have been translated into US dollars for presentation purposes, as described in Note 3.
Financial assets at fair value in other comprehensive income
This reserve records the changes in fair value of certain investments in equity securities in Other Comprehensive Income. The Group 
transfers amounts from this reserve to retained earnings when the relevant equity securities are derecognised.
Premium on acquisition reserve
This reserve represents the premium paid on the acquisition of an interest in Summit Resources Ltd.
NOTE 8.  FINANCIAL RISK MANAGEMENT
Financial Risk Management Objectives and Policies
The Group’s management of financial risk is aimed at ensuring net cash flows are sufficient to:
•	 Meet all its financial commitments; and
•	 Maintain the capacity to fund corporate growth activities.
The Group monitors its forecast financial position and manages funds on a group basis on a regular frequency.
Market, liquidity and credit risk (including foreign exchange, commodity price and interest rate risk) arise in the normal course of the 
Group’s business. These risks are managed under Board approved directives which underpin practices and processes. The Group’s 
principal financial instruments comprise interest bearing debt, cash and short-term deposits and available for sale financial assets. 
Other financial instruments include trade receivables and trade payables, which arise directly from operations.
Market Risk
Foreign Exchange Risk
The Group operates internationally and is exposed to foreign exchange risk arising from various currency exposures.
Foreign exchange risk arises from future commitments, assets and liabilities that are denominated in a currency that is not the 
functional currency of the relevant Group company.
The Group’s borrowings and deposits are largely denominated in US dollars. Currently there are no foreign exchange hedge 
programmes in place. However, the Group finance function manages the purchase of foreign currency to meet operational 
requirements.
PALADIN ENERGY ANNUAL REPORT 2024
101

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
Market Risk (Continued)
The financial instruments exposed to movements in the Australian dollar against the USD are as follows:
2024 
US$’000
2023 
US$’000
Financial assets
Cash and cash equivalents
4,786
85,452
Trade and other receivables
476
197
Financial assets - held for sale
-
1,590
5,262
87,239
Financial liabilities
Trade and other payables
(2,841)
(537)
Lease liabilities
(1,290)
(355)
(4,131)
(892)
Net exposure
1,131
86,347
The following table summarises the sensitivity of financial instruments held at balance sheet date to movements in the exchange 
rate of the Australian dollar to the US dollar, with all other variables held constant. The 9% sensitivity is based on reasonably possible 
changes, over a financial year, using the observed range of actual historical rates for the preceding five year period.
Impact on Profit/(Loss)
Impact on Equity
2024 
US$’000
2023 
US$’000
2024 
US$’000
2023 
US$’000
Post-tax gain/(loss)
AUD/USD +9% (2023: +9%)
78
5,978
-
110
AUD/USD -9% (2023: -9%)
(65)
(4,991)
-
(92)
 
The financial instruments exposed to movements in the Namibian dollar (NAD) against the USD are as follows:
2024 
US$’000
2023 
US$’000
Financial assets
Cash and cash equivalents
4,490
1,988
Trade and other receivables
7,747
2,345
12,237
4,333
Financial liabilities
Trade and other payables
(18,286)
(8,297)
Lease liabilities
(710)
(427)
(18,996)
(8,724)
Net exposure
(6,759)
(4,391)
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
102

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
Market Risk (Continued)
The following table summarises the sensitivity of financial instruments held at balance sheet date to movements in the exchange 
rate of the Namibian dollar to the US dollar, with all other variables held constant. The 14% sensitivity is based on reasonably possible 
changes, over a financial year, using the observed range of actual historical rates for the preceding five year period.
Impact on Profit/(Loss)
2024 
US$’000
2023 
US$’000
Post-tax gain/(loss)
NAD/USD +14% (2023: +14%)
(688)
(447)
NAD/USD -14% (2023: -14%)
519
337
Interest Rate Risk
Interest rate risk is the risk that the Group’s financial position will be adversely affected by movements in interest rates that will increase 
the cost of floating rate debt, create opportunity losses on fixed rate borrowings in a falling interest rate environment or reduce  
interest income.
The interest rate risk on cash balances is not considered material. Cash at bank earns interest at floating rates based on daily bank 
deposit rates. Short-term deposits are made for varying periods depending on the immediate cash requirements of the Group and earn 
interest at the respective short-term deposit rates.
The group is exposed to interest rate risk on the Debt Facility and shareholder loans (Note 6) from changes in the variable component 
interest rates on its outstanding borrowings, from the possibility that changes in interest rate will affect future cash flows of the group. 
The debt and bank covenants of the Group (Note 8) are monitored and reforecast in order to monitor interest rate risk.
The CNNC shareholder loans represent the 25% of intercompany shareholder loans owing by LHU to PFPL that were assigned to 
CNNC upon the sale of a 25% interest in LHMHL to CNNC in 2014. The remaining 75% is held between PFPL and LHU. These loans 
have a range of fixed and floating rates. During the previous three years, certain shareholder loans were extended with revised 
conditions or entered into. Note 6 details the impact of these arrangements. All other financial assets and liabilities in the form of 
receivables, investments in shares, payables and provisions, are non-interest bearing.
The Group currently does not engage in any hedging or derivative transactions to manage interest rate risk.
The floating rate financial instruments exposed to interest rate movements are as follows:
2024
US$’000
2023
US$’000
Financial assets
Cash and cash equivalents
48,858
126,636
Restricted cash
4,322
1,014
53,180
127,650
Financial liabilities
Interest-bearing liabilities
(99,665)
(58,912)
Net exposure
(46,485)
68,738
Sensitivity
Profit or loss is sensitive to higher or lower interest income from cash and cash equivalents and interest expenses on borrowings  
as a result of change in interest rates. There would be no material impact on other components of equity as a result of changes  
in interest rates.
The following table demonstrates the sensitivity to a reasonable change in US interest rates to the profit or loss after tax. A normal level 
of volatility has been assessed as 150 basis points and the sensitivity below has been calculated on that basis.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
103

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
2024 
US$’000
2023 
US$’000
Post-tax gain/(loss)
+1.50% (150 basis points)
(736)
277
-1.50% (150 basis points)
736
(277)
The sensitivity analysis assumes that the change in interest rates is effective from the beginning of the financial year and the balances 
are constant over the year.
Market Price Risk 
Market Price risk is the risk that the Group’s financial position will be adversely affected by movements in the market value of its 
available-for-sale financial assets.
The financial instruments exposed to movements in market value are as follows:
2024 
US$’000
2023 
US$’000
Financial assets
Financial assets – held for sale
-
1,590
The following table summarises the sensitivity of financial instruments held at balance date to movements in the market price of 
available-for-sale financial instruments, with all other variables held constant. The 25% sensitivity is based on reasonable possible 
changes, over a financial year, using the observed range of actual historical prices.
2024
US$’000
2023
US$’000
Post-tax gain/(loss)
Market price +25% (2023: +25%)
-
278
Market price -25% (2023: -25%)
-
(278)
Post-tax impact on equity
Market price +25% (2023: +25%)
-
278
Market price -25% (2023: -25%)
-
(278)
Liquidity Risk 
The liquidity position of the Group is managed to ensure sufficient liquid funds are available to meet the Group’s financial commitments 
in a timely and cost effective manner. The Group finance function continually reviews the Group’s liquidity position including cash flow 
forecasts to determine the forecast liquidity position and maintain appropriate liquidity levels. Sensitivity analysis is conducted on a 
range of pricing and market assumptions to ensure the Group has the ability to meet commitments. This enables the Group to manage 
cash flows on a long term basis and provides the flexibility to pursue a range of funding alternatives if necessary. Note 6 details the 
repayment obligations in respect of the amount of the Term Facility, Revolving Facility and shareholder loan facilities.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
104

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
Liquidity Risk (continued)
The maturity profile of the Group’s payables based on contractual undiscounted payments is as follows:
Payables Maturity Analysis
Total 
US$’000
<1 year 
US$’000
1-2 years 
US$’000
2-3 years 
US$’000
>3 years 
US$’000
2024
Trade and other payables
15,122
15,122
-
-
-
Lease liabilities
2,577
805
389
249
1,134
LHU’s loans from CNNC – principal
81,824
-
-
-
81,824
Interest payable on CNNC loans 
35,378
-
-
-
35,378
Debt Facility
70,000
33,500
21,250
15,250
-
Total payables
204,901
49,427
21,639
15,499
118,336
2023
Trade and other payables
9,094
9,094
-
-
-
Lease liabilities
887
205
489
193
LHU’s loans from CNNC – principal
81,824
-
-
-
81,824
Interest payable on CNNC loans 
31,331
-
-
-
31,331
Total payables
123,136
9,299
489
193
113,155
 
The Group’s major standby arrangement at 30 June 2024 are as follows:
 
Limit 
US$’000
Drawn 
US$’000
Undrawn 
US$’000
Term Facility
100,000 
(50,000)
50,000 
Revolving Facility
50,000 
(20,000)
30,000 
Total
150,000
(70,000)
80,000
Credit Risk
Credit risk arises from cash and cash equivalents, contractual cash flows from other receivables carried at amortised cost and deposits 
with banks and financial institutions, as well as credit exposures to trade receivables. Credit risk is the risk that a contracting entity will 
not complete its obligation under a financial instrument that will result in a financial loss to the Group. The carrying amount of financial 
assets represents the maximum credit exposure. The Group’s receivables are due from recognised, creditworthy third parties. In addition, 
receivable balances are monitored on an ongoing basis.
While cash and cash equivalents are also subject to the impairment requirements of AASB 9 the identified impairment loss is expected 
to be immaterial.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
105

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
Credit Risk (continued)
The maximum exposure to credit risk at the reporting date is set out below.
2024 
US$’000
2023 
US$’000
Current
Cash and cash equivalents1
48,858
126,636
Restricted cash2
4,322
1,014
Trade and other receivables
725
445
53,905
128,095
Non-Current
Trade and other receivables
631
355
Total
54,536
128,450
1	
The Group’s maximum deposit with a single financial institution represents 45% (2023: 52%) of cash and cash equivalents. This financial institution has a credit rating of Aa2 (2023: Aa3). 
2	
Restricted cash is held in Namibia, this financial institution has a credit rating of Baa3 (2023: Ba2).
Receivables Maturity Analysis
2024
Total 
US$’000
<1 year 
US$’000
1-2 years 
US$’000
2-3 years 
US$’000
Trade receivables
212
-
212
-
Other receivables
1,144
725
419
-
Total receivables
1,356
725
631
-
2023
Trade receivables
164
-
164
Other receivables
636
445
191
-
Total receivables
800
445
355
-
The Group applies the AASB 9 simplified approach to measuring expected credit losses which uses a lifetime expected loss allowance 
for all trade receivables. 
For Other Receivables, the Group considers the probability of default upon the initial recognition of an asset. The Group also considers 
whether there has been a significant increase in credit risk on an ongoing basis throughout each reporting period. To assess whether 
there is a significant increase in credit risk the Company:
•	 compares the risk of a default occurring on the asset as at the reporting date with the risk of default as at the date of initial recognition
•	 considers available reasonable and supportive forwarding-looking information in calculating the expected credit loss rates.
Where possible, the Group has applied an expected credit loss based on industry provided information.
Fair Values
The fair value of the financial instruments as well as the methods used to estimate the fair value are summarised in the table below:
Year ended 30 June 2024
Year ended 30 June 2023
(Level 1) 
US$’000
(Level 2)
US$’000
(Level 3)
US$’000
Total
US$’000
(Level 1)
US$’000
(Level 2)
US$’000
(Level 3)
US$’000
Total
US$’000
Financial assets for which fair values are disclosed
Australia listed shares
-
-
-
-
1,590
-
-
1,590
Total financial assets
-
-
-
-
1,590
-
-
1,590
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
106

NOTE 8.  FINANCIAL RISK MANAGEMENT (CONTINUED)
Fair Values (continued)
Quoted market price represents the fair value determined based on quoted prices in active markets as at the reporting date without 
any deduction for transaction costs. The fair value of the listed equity investments is based on quoted market prices which are 
classified as Level 1 inputs.
For financial instruments not quoted in active markets, the Group uses valuation techniques such as present value techniques, 
comparison to similar instruments for which market observable prices exist and other relevant models used by market participants. 
These valuation techniques use both observable (Level 2) and unobservable (Level 3) market inputs.
For financial instruments that are recognised at fair value on a recurring basis, the Group determines whether transfers have occurred 
between Levels in the hierarchy by re-assessing categorisation (based on the lowest level input that is significant to the fair value 
measurement as a whole) at the end of each reporting period.
Due to the nature of some of the non-current other receivables, their carrying amount is considered to be the same as their fair value.
Capital Management
When managing capital, management’s objective is to ensure adequate cash resources to meet the Company’s commitments are 
maintained, as well as to maintain optimal returns to shareholders through ensuring the lowest cost of capital available to the entity.
The Company utilises a combination of debt and equity to provide the cash resources required. Management reviews the capital 
structure from time to time as appropriate.
The Group finance function is responsible for the Group’s capital management, including management of long-term debt and cash 
as part of the capital structure. This involves the use of corporate forecasting models which enable analysis of the Group’s financial 
position including cash flow forecasts to determine the future capital management requirements. To ensure sufficient funding for 
operational expenditure and growth activities, a range of assumptions are modelled so as to provide the flexibility in determining the 
Group’s optimal future capital structure.
2024 
US$’000
2023 
US$’000
Debt (face value plus accrued interest)1
68,033
-
Less cash and cash equivalents
(48,858)
(126,636)
Net Debt
19,175
-
Total equity
397,815
335,084
Total Capital
416,990
335,084
Gearing Ratio (defined as net debt/total capital)
4.60%
0%
1	
Excludes LHU’s loans from CNNC that were assigned by PFPL to CNNC and form part of CNNC’s 25% interest in LHU as the Group views these as shareholder loans to LHU. (refer 
Note 6).
Loan Covenants
Under the terms of the Debt Facility, which has a carrying amount of US$70M (excluding accrued interest and capitalisation of 
transaction costs) (2023: Nil), the group is required to comply with the following financial covenants at the end of each quarter:
Financial Condition
Required Ratio / Amount
2024
Debt service cover ratio
>1.3:1
n/a1
Loan life cover ratio
>1.5:1
Complied
Reserve tail ratio
>30%
Complied
Minimum offtake
25%
Complied
Minimum cash balance
US$15M
Complied
1 	 Not required at 30 June 2024 under the terms of the Debt Facility
There are no indications that the group may have difficulties complying with the covenants when they will be next tested for the 
quarter ended as at 30 September 2024.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
107

PERFORMANCE FOR THE YEAR
NOTE 9.  REVENUE
2024 
US$’000
2023 
US$’000
Sale of uranium
-
-
Total
-
-
Recognition and Measurement
The Group primarily generates revenue from the sales of Uranium or Triuranium Octoxide (U₃O₈) to customers. Amounts disclosed as 
revenue are net of duties and taxes paid. 
Revenue is measured based on the consideration specified in a contract with a customer. The Group’s sales arrangements with its 
customers are pursuant to enforceable contracts that provide for the nature and timing of satisfaction of performance obligations, 
including payment terms and payment due dates. Each delivery is considered a separate performance obligation under the contract. 
Each unit price is known at the time of revenue recognition. In some instances, there may be quantity adjustments, but it is highly 
probable that no material quantity adjustments will occur, and revenue is recognised based on expected value method.
The Group recognises revenue when it transfers control over a good or service to a customer. The Group has concluded that this occurs 
on the delivery of the product to the customer to the port of delivery or at the converter. When uranium is delivered to converters, the 
converter will credit the Group’s account for the volume of accepted uranium. Based on delivery terms in the sales contract with its 
customer, the converter will transfer the title of a contractually specified quantity of uranium to the customer’s account at the converter’s 
facility. At this point, control has been transferred and the Group recognises revenue for the uranium supply. The amount of revenue 
recognised reflects the consideration to which the Group expects to be entitled in exchange for transferring goods or services. 
There may be circumstances when judgment is required based on five indicators of control below:
•	 The customer has the significant risks and rewards of ownership and has ability to direct the use of, and obtain substantially all of the 
remaining benefits from, the goods or service. 
•	 The customer has a present obligation to pay in accordance with the terms of the sales contract. 
•	 The customer has accepted the asset. Sale revenue may be subject to adjustment if the product specification does not conform to 
the terms specified in the sales contract, but this does not impact the passing of control. Assay and specification adjustments are 
expected to be immaterial.
•	 The customer has legal title to the asset. The Group usually retains legal title until the U₃O₈ held by the converter is transferred from 
the Group’s account to the respective customer’s account, or when the U₃O₈ arrives at a specified delivery location.
•	 The customer or customer’s agent has physical possession of the asset.
The Group’s products are sold to customers under contracts that vary in tenure and pricing mechanisms, including some volumes 
sold on the spot market. Pricing for Uranium is on a range of terms, the majority being either monthly or quarterly average pricing 
mechanisms plus price adjustment factors driven by market inputs.
For some customer contracts, revenue may be provisionally recognised due to variability in the quantity delivered, and a provisional 
invoice issued under the expected value method. 
The sales contracts with customers contain fixed-price, base-escalated and market-related pricing. Fixed-price contracts are based 
on a fixed price at the time the contract is accepted. Base-escalated contracts are typically based on a term price indicator at the 
time the contract is accepted and escalated over the term of the contract. Market-related contracts are based on either the spot price 
or long-term price, and the price is quoted at the time of delivery rather than at the time the contract is accepted. These contracts 
often include floor and/or ceiling prices, which are usually escalated over the term of the contract. Escalation is generally based on a 
consumer price index. The Company’s contracts contain either one or a combination of these pricing mechanisms. There is no variable 
consideration in the contracts and therefore no revenue is considered constrained at the time of delivery.
The receivables are subsequently measured at amortised cost under AASB 9, “Financial Instruments” which is same as carrying 
amount due to the short-term nature and the absence of financing component as described in Note 14.
The Group has a right to payment before or at the point that control of goods passes, including a right, where applicable to payment for 
provisionally invoiced Uranium. Cash received before control passes is recognised as a contract liability. The amount of consideration does 
not contain a significant financing component as the timing difference between the payment and revenue recognition is less than one year. 
The Group has number of long-term contracts to supply Uranium to customers in future period. Revenue is recognised when the U₃O₈ held 
by the converter is transferred from the Group’s account to the respective customer’s account, or when the U₃O₈ arrives at a specified 
delivery location and therefore the right to consideration from a customer corresponds directly with performance completed to date.
No revenue from the sales of Uranium or Triuranium Octoxide (U₃O₈) to customers was recognised during the year (2023: Nil).
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
108

NOTE 10. INCOME AND EXPENSES
2024 
US$’000
2023 
US$’000
Cost of goods sold
-
-
Other income
Interest income
2,289
4,535
Sundry Income
50
161
Total
2,339
4,696
Other losses
Net loss on disposal of property, plant and equipment
-
(512)
Net foreign exchange (loss)/gain
(1,943)
584
General and administration costs
Corporate and marketing
(2,759)
(3,353)
LHM mine site
(7,542)
(6,669)
LHM depreciation and amortisation
(6,310)
(2,738)
Share based payments
(3,577)
(4,092)
Other
(389)
(612)
Total
(20,577)
(17,464)
Other gains
Gain on termination of lease
69
-
Impairment reversal of stockpile
92,195
-
Finance costs
LHU’s loans from CNNC
(4,048)
(3,564)
Accretion expense on shareholder loans
(3,583)
(7,501)
Mine closure provision accretion expense
(3,205)
(3,249)
Lease interest expense
(124)
(48)
Syndicated Debt Facility
(1,125)
-
Total
(12,085)
(14,362)
Total depreciation and amortisation expense
(6,443)
(2,909)
 
Recognition and Measurement
Borrowing Costs
Borrowing costs are expensed as incurred including the unwinding of discounts related to mine closure provisions.
2024 
US$’000
2023 
US$’000
Employee Benefits Expense
Wages and salaries
(5,502)
(2,829)
Defined contribution superannuation
(489)
(313)
Share-based payments
(3,577)
(4,092)
Other employee benefits
(1,819)
(1,244)
Total
(11,387)
(8,480)
The table above sets out personnel costs expensed during the year and which are included within general administration costs within 
the Consolidated Income Statement.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
109

NOTE 11.  INCOME AND OTHER TAXES
2024 
US$’000
2023 
US$’000
Income Tax Expense
Current income tax
Current income tax expense
-
-
Deferred income tax
Decrease/(increase) in deferred tax assets
-
-
(Decrease)/increase in deferred tax liabilities
-
-
Income tax expense reported in the Consolidated Income Statement
-
-
Amounts charged or credited directly to equity
Deferred income tax related to items charged or credited directly to equity:
Capital gain on sale of investments held for sale
-
373
Capital gains applied
-
(373)
Income tax benefit reported in equity
-
-
Numerical Reconciliation of Income Tax Benefit to Prima Facie Tax Payable
Profit / (Loss) before income tax expense from continuing operations
59,998
(27,058)
Tax at the Australian tax rate of 30% (2023 – 30%)
17,999
(8,117)
Difference in overseas tax rates
1,972
(4,917)
Non-deductible items
1,289
989
Previously unrecognised Australian tax losses now recouped to reduce current tax expense
(7,851)
(3,137)
Previously unrecognised Namibian tax losses now recouped to reduce current tax expense
(9,204)
-
Deferred tax on temporary differences not recognised
(4,205)
15,182
Income tax expense reported in the Consolidated Income Statement
-
-
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
110

1	
Including tax losses transferred from Summit Resources Limited on Consolidation.
2	
The unrecognised capital losses were predominantly generated from the sale of Paladin (Africa) Ltd. The benefit of these unused capital losses will only be obtained if sufficient 
future capital gains are made, and the losses remain available under tax legislation.
3	
The change in unused capital tax losses from prior year relates to a reclassification of income tax losses previously included in the calculation of capital losses.
4	
Includes losses in Namibia (US$338M – 2023: US$363M)
NOTE 11.  INCOME AND OTHER TAXES (CONTINUED)
Tax Losses
2024 
US$’000
2023 
US$’000
Australian unused income tax losses for which no deferred tax asset has been recognised1
(187,199)
(55,610)
Australian unused capital losses for which no deferred tax asset has been recognised2,3
(486,280)
(652,028)
Other unused income tax losses for which no deferred tax asset has been recognised4
(339,844)
(364,508)
Total unused tax losses for which no deferred tax asset has been recognised
(1,013,323)
(1,072,146)
Deferred Income Tax
Deferred tax liabilities
Accelerated prepayment deduction for tax purposes
(3,342)
(26)
Accelerated depreciation for tax purposes
(61,869)
(59,949)
Exploration expenditure
(3,862)
(3,719)
Inventory / Consumables
(3,956)
(2,939)
Other
(52,573)
(81,883)
Gross deferred tax liabilities
(125,602)
(148,516)
Set off of deferred tax assets
125,602
148,516
Net deferred tax liabilities
-
-
Deferred tax assets
Namibia Revenue losses available for offset against future taxable income
109,662
170,989
Foreign currency balances
90,834
116,868
Interest bearing liabilities
66,543
12,491
Provisions
6,255
8,224
Other
8,844
4,085
Australian Group deferred tax asset on carried forward losses 
187,198
(3,137)
Deferred tax assets not recognised
(343,734)
(161,004)
Gross deferred tax assets
125,602
148,516
Set off against deferred tax liabilities
(125,602)
(148,516)
Net deferred tax assets recognised
-
-
Paladin and all its wholly owned Australian resident entities are part of a tax-consolidated group under Australian tax law. The net 
deferred tax assets recognised are in respect of revenue losses expected to be offset against future taxable income. 
This benefit for tax losses will only be obtained if:
1.	 The Consolidated Entities derive future assessable income of a nature and of an amount sufficient to enable the benefit from the 
deductions for the losses to be realised;
2.	 The Consolidated Entities continue to comply with the conditions for deductibility imposed by tax legislation; and
3.	 No changes in tax legislation adversely affect the Consolidated Entities in realising the benefit from the deductions for the losses.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
111

NOTE 11.  INCOME AND OTHER TAXES (CONTINUED)
Recognition and Measurement
Current income tax assets and liabilities for the current period are measured at the amount expected to be recovered from or paid to 
the taxation authorities. The tax rates and tax laws used to compute the amount are those that are enacted or substantially enacted, at 
the reporting date in the countries where the Group operates and generates taxable income.
Current income tax relating to items recognised directly in other comprehensive income or equity is recognised in other comprehensive 
income or equity respectively and not in the income statement. Management periodically evaluates positions taken in the tax returns 
with respect to situations in which applicable tax regulations are subject to integration and establishes provisions where appropriate.
Deferred tax assets and liabilities are recognised using the full liability method for temporary differences at the tax rates expected to 
apply when the assets are recovered or liabilities are settled, based on those tax rates which are enacted or substantively enacted 
for each jurisdiction. The relevant tax rates are applied to the cumulative amounts of deductible and taxable temporary differences to 
measure the deferred tax asset or liability. An exception is made for certain temporary differences arising from the initial recognition 
of an asset or a liability. No deferred tax asset or liability is recognised in relation to these temporary differences if they arose in a 
transaction, other than a business combination, that at the time of the transaction did not affect either accounting profit or taxable 
profit or loss.
Deferred tax assets are recognised for deductible temporary differences and unused tax losses only if it is probable that future 
taxable amounts will be available to utilise those temporary differences and losses. Current and deferred tax balances attributable to 
amounts recognised directly in equity are also recognised directly in equity. Deferred tax assets and liabilities are offset only if a legally 
enforceable right exists to set off current tax assets against current tax liabilities and the deferred tax assets and liabilities relate to the 
same taxable entity and the same taxation authority.
NOTE 12. EARNINGS PER SHARE
2024 
US cents
2023  
US cents
Profit/(loss) per share attributable to ordinary equity holders of the Parent  
from continuing operations – Basic
17.9
(4.0)
Profit/(loss) per share attributable to ordinary equity holders of the Parent  
from continuing operations - Diluted
17.9
(4.0)
The following reflects the income and share data used in the basic and diluted earnings per share computations:
2024 
US$’000
2023 
US$’000
Net profit/(loss) attributable to ordinary equity holders of the Parent from continuing operations
53,628
(10,572)
2024
Number 
of Shares
2023
Number 
of Shares
Weighted average number of ordinary shares used in calculation of basic earnings per share
299,187,981 
297,939,149
Weighted average number of ordinary shares used in calculation for diluted earnings per share
 300,295,997
299,668,379
Total number of securities not included in weighted average calculation due to their antidilutive 
nature in the current period, that could potentially dilute basic earnings per share in the future
-
1,729,230
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
112

NOTE 12.  EARNINGS PER SHARE (CONTINUED)
Recognition and Measurement
Basic Earnings Per Share
Basic earnings per share are calculated by dividing the profit attributable to equity holders of the Company by the weighted average 
number of ordinary shares outstanding during the period.
Diluted Earnings Per Share 
Diluted earnings per share adjusts the figures used in the determination of basic earnings per share to take into account the after 
income tax effect associated with dilutive potential ordinary shares and the weighted average number of shares assumed to have been 
issued for no consideration in relation to dilutive potential ordinary shares. Diluted earnings per share is the same as basic earnings per 
share in FY2024 and FY2023 as the number of potentially dilutive shares does not materially change the result of earnings per share.
NOTE 13.  RECONCILIATION OF EARNINGS AFTER INCOME TAX TO NET CASH FLOW FROM OPERATING ACTIVITIES
2024 
US$’000
2023 
US$’000
Reconciliation of Profit/(Loss) After Tax to Net Cash Flows Used in Operating Activities
Profit/(loss) after tax
59,998
(27,058)
Adjustments for
Depreciation and amortisation
6,443
2,909
Exploration expenditure
135
441
Sundry income
-
(421)
Impairment reversal on stockpile
(92,195)
-
Gain on termination of lease
(69)
-
Loss on disposal of property, plant and equipment
-
512
Net exchange differences
1,943
(580)
Share-based payments
3,577
4,092
Non-cash financing costs
7,376
6,862
Accretion expense on shareholder loan
3,583
7,501
Changes in operating assets and liabilities
(Increase)/decrease in prepayments
133
(977)
(Increase) in restricted cash 
(3,259)
-
(Increase) in trade and other receivables
(5,353)
(2,507)
(Increase) in inventories
(35,743)
(546)
Increase in trade and other payables
5,880
413
(Decrease) in provisions
(515)
(16)
Net cash flows used in operating activities
(48,116)
(9,375)
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
113

OPERATING ASSETS AND LIABILITIES 
NOTE 14.  TRADE AND OTHER RECEIVABLES
Notes
2024 
US$’000
2023 
US$’000
Current
Trade receivables and other receivables
A
725
445
GST and VAT
B
7,231
2,311
Total current receivables
7,956
2,756
Non-Current
Trade receivables and other receivables
A
212
355
Long term deposits
C
419
-
Total non-current receivables
631
355
A.	 Trade receivables are non-interest bearing. Carrying value approximates fair value due to the short-term nature of the receivables. 
Other receivables are amounts that generally arise from transactions outside the usual operating activities of the Group. 
	
Future cash receivables - An expected credit loss model is used for calculating credit losses. Details about the Group’s impairment 
policies and the calculation of the expected credit loss are provided in Note 8.
B.	 GST and VAT receivables relates to amounts due from Governments in Australia, Namibia and Canada.
C.	 Long term deposits relates to guarantees provided by a bank for the corporate office lease, tenements and corporate credit cards.
Recognition and Measurement
Trade Receivables
Receivables are initially recognised at fair value and subsequently at the amounts considered receivable. Trade receivables are 
amounts due from customers for goods sold or services performed in the ordinary course of business. They are generally due for 
settlement within 30 days and therefore are all classified as current. 
Due to the short-term nature of the current receivables, their carrying amount is assumed to approximate fair value.
Other Receivables
These amounts generally arise from transactions outside the usual operating activities of the Group.
The Group assesses on a forward-looking basis the expected credit loss associated with its financial instruments carried at amortised 
cost and fair value through other comprehensive income. The impairment methodology applied depends on whether there has been a 
significant increase in credit risk. 
For trade receivables, the Group applies the simplified approach permitted by AASB 9, which requires expected lifetime losses to be 
recognised from initial recognition of the receivables.
Trade receivables are written off where there is no reasonable expectation of recovery. Indicators that there is no reasonable 
expectation of recovery include, amongst others, the failure of a debtor to engage in a repayment plan with the Group, and a failure to 
make contractual payments for a period of greater than 120 days past due. Impairment losses on trade receivables are presented as 
net impairment losses within operating profit. Subsequent recoveries of amounts previously written off are credited against the same 
line item.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
114

NOTE 15.  PREPAYMENTS
2024 
US$’000
2023 
US$’000
Current
Advance payments
10,306
9,027
Prepayments
2,739
2,100
Total prepayments
13,045
11,127
Recognition and Measurement
Advance Payments
Advance payments reflect payments made upfront to suppliers. These payments are taken to Work in Progress when services are 
consumed in the future period.
Prepayments
Prepayments include transaction costs for the Debt Facility, payments made for lease rentals, insurance and other miscellaneous 
services. The Group expenses the prepayment over the corresponding period that the asset is consumed. Costs incurred towards the 
Debt Facility are deducted from borrowings as the Term Facility is drawn down.
NOTE 16.  INVENTORIES
2024  
US$’000
2023 
US$’000
Current
Ore stockpiles
72,138
-
Finished goods
27,984
-
Work in progress
17,003
-
Stores and consumables
8,143
5,646
Total current inventories at the lower of cost and net realisable value
125,268
5,646
Non-Current
Ore stockpiles
8,317
-
Total non-current inventories at the lower of cost and net realisable value
8,317
-
Write-up and down of Inventories
During FY2024 stores and consumables held at the LHM were written up by US$0.9M (2023: written down by US$0.03M) as items 
previously recognised as slow moving during Care and Maintenance were used during the LHM Restart Project.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
115

NOTE 16.  INVENTORIES (CONTINUED)
Recognition and Measurement
Ore stockpiles are valued at the lower of cost and net realisable value using the weighted average cost method. The cost is derived on 
an absorption costing basis, including both fixed and variable product.
Finished goods and work in progress inventory are valued at the lower of cost and net realisable value using the weighted average cost 
method. Cost is derived on an absorption costing basis, including both fixed and variable production costs and attributable overheads 
incurred up to the delivery point where legal title to the product passes. No accounting value is attributed to stockpiles containing ore 
at less than the cut-off grade.
The costs of production include labour costs, materials and contractor expenses which are directly attributable to the extraction and 
processing of ore (including any recognised expense of stripping costs); the depreciation of property, plant and equipment used in the 
extraction and processing of ore; and production overheads.
Consumable stores inventory is valued at the lower of cost and net realisable value using the weighted average cost method, after 
appropriate allowances for redundant and slow moving items.
Significant Estimates and Assumptions
Net Realisable Value of Inventories
The Group reviews the carrying value of inventories regularly to ensure that their cost does not exceed net realisable value. In 
determining net realisable value various factors are taken into account, including sales prices and costs to complete inventories to  
their final form.
During 2016, the carrying value of ore stockpiles held at the LHM was reduced to net realisable value resulting in a write down of 
US$168.9M for the year, recognised in other expenses. Subsequent to 30 June 2016, approximately 45% of the original stockpile 
previously impaired was consumed prior to the LHM going into Care and Maintenance leaving a residual of 6.3M tonnes. The net 
realisable value of the ore stockpiles is dependent on a number of key factors including: uranium price, future processing costs, grade 
and recovery rates. At 31 December 2023 Management considered the impairment on the remaining stockpile should be reversed 
in view of the changed economic circumstances taking into account the progress of the LHM Restart Project, the negotiation of key 
contracts and the improvement in the uranium market prices. Subsequent to that date the Restart Project was completed and first 
commercial production achieved in the last quarter of FY2024.
NOTE 17.  FINANCIAL ASSETS – HELD FOR SALE
2024  
US$’000
2023  
US$’000
Current financial assets
-
1,590
Included in the Group’s current financial assets at 30 June 2023 was an investment in Lotus Resources Ltd a company listed on the ASX. 
This investment arose as part of the final consideration in relation to the sale of Paladin (Africa) Ltd to Lotus Resources Ltd completed 
on 13 March 2020. Since 1 July 2023, the shares have been sold at market prices ranging from A$0.235 to A$0.236 per share, for gross 
proceeds of A$3.0M (US$1.9M). Immediately prior to the sale the shares were revalued to fair value of US$2.0M based on the closing 
share price. On sale the amount in the Asset Revaluation Reserve associated with those shares of US$0.1M was transferred to retained 
earnings (net of tax $Nil).
Recognition and Measurement
Financial assets are recognised on trade date, being the date on which the Group commits to purchase or sell the asset.
Equity Instruments
The Group measures all equity investments at fair value. Where the Group’s management has elected to present fair value gains 
and losses on equity investments in OCI, there is no subsequent reclassification of fair value gains and losses to the Consolidated 
Income Statement following the derecognition of the investment. Dividends from such investments continue to be recognised in the 
Consolidated Income Statement as other income when the Group’s right to receive payments is established.
Changes in the fair value of financial assets at FVPL are recognised in other gains/(losses) in the Consolidated Income Statement 
as applicable. Impairment losses (and reversal of impairment losses) on equity investments measured at FVOCI are not reported 
separately from other changes in fair value.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
116

NOTE 18.  PROPERTY, PLANT AND EQUIPMENT
Right of  
Use Asset
US$’000
Total 
Property, 
Plant and 
Equipment
US$’000
Plant and 
Equipment 
US$’000
Land and 
Buildings 
US$’000
Construction 
Work in 
Progress
US$’000
2024
NET CARRYING VALUE
At 1 July 2023
817
197,928
158,532
3,753
35,643
Additions
1,694
76,614
349
-
76,265
Depreciation and amortisation expense
(98)
(5,242)
(5,182)
(60)
-
Transfer in/(out)
-
-
70,774
1,758
(72,532)
Transfer out to mine development
-
(39,086)
-
-
(39,086)
Disposals
(521)
(21)
(21)
-
-
Foreign currency translation
-
(7)
(7)
-
-
At 30 June 2024
1,892
230,186
224,445
5,451
290
Cost
2,220
420,183
408,725
11,168
290
Accumulated depreciation
(328)
(189,997)
(184,280)
(5717)
-
2023
NET CARRYING VALUE
At 1 July 2022
918
166,274
160,634
4,044
1,596
Additions
34
34,997
303
44
34,650
Depreciation and amortisation expense
(135)
(2,768)
(2,738)
(30)
-
Transfer in/(out)
-
-
603
-
(603)
Disposals
-
(571)
(266)
(305)
-
Foreign currency translation
-
(4)
(4)
-
-
At 30 June 2023
817
197,928
158,532
3,753
35,643
Cost
1,047
384,866
339,813
9,410
35,643
Accumulated depreciation
(230)
(186,938)
(181,281)
(5,657)
-
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
117

NOTE 18.  PROPERTY, PLANT AND EQUIPMENT (CONTINUED)
Property, Plant and Equipment Pledged as Security for Liabilities
No property, plant and equipment has been pledged as security.
Recognition and Measurement
All property, plant and equipment are stated at historical cost less accumulated depreciation and impairment losses. Historical cost 
includes expenditure that is directly attributable to the acquisition of the items.
Subsequent costs are included in the asset’s carrying amount or recognised as a separate asset, as appropriate, only when it is 
probable that future economic benefits associated with the item will flow to the Group and the cost of the item can be measured 
reliably. All other repairs and maintenance are charged to the Consolidated Income Statement during the financial period in which they 
are incurred.
Property, plant and equipment costs include both the costs associated with construction of equipment associated with establishment 
of an operating mine, and the estimated costs of dismantling and removing the asset and restoring the site on which it is located.
Land is not depreciated. Depreciation on other assets is calculated using the unit of production basis or the straight line method to 
allocate their cost amount, net of their residual values, over their estimated useful lives, as follows:
•	 Buildings	
20 years
•	 Databases	
10 years
•	 Plant and equipment	
2-6 years
•	 Leasehold improvements	
period of lease
•	 Mine plant and equipment	
remaining useful life of the assets
The estimates of useful lives, residual values and depreciation method are reviewed at the end of each reporting period with the effect 
of any changes in estimate accounted for on a prospective basis.
Significant Estimates and Assumptions
Change in Accounting Estimate
As a result of the decision to return the LHM to production, there has been a change in the basis for depreciating the LHM. Whilst the 
LHM was in Care and Maintenance, relevant tangible non-current assets were depreciated using the Straight Line method. From 1 
July 2022, the basis of depreciation has changed prospectively to the units of production method over the remaining useful life of the 
assets resulting in a depreciation charge for those assets for the year amounting to US$2.4M (2023: Nil). Depreciation charges under 
the unit of production method commenced from 1 April 2024, which has resulted in an increase in depreciation charges for the period 
amounting to US$2.5M (2023: decrease of US$9.7M).
Impairment of Property, Plant and Equipment; Mine Development and Intangibles
Property, plant and equipment; mine development and intangibles are tested for impairment whenever events or changes in 
circumstances indicate that the carrying value may not be recoverable. 
The Group conducts an internal review of asset values at each reporting date, which is used as a source of information to assess for 
any indicators of impairment. Factors, such as changes in uranium prices, production performance and mining and processing costs 
are monitored to assess for indicators of impairment. If any indication of impairment exists, an estimate of the asset’s recoverable 
amount is calculated. 
An impairment loss is recognised for the amount by which the asset’s carrying amount exceeds its recoverable amount. The recoverable 
amount is the higher of an asset’s fair value less costs of disposal and value in use. For the purposes of assessing impairment, assets are 
grouped at the lowest levels for which there are separately identifiable cash inflows that are largely independent of the cash inflows from 
other assets or groups of assets (cash-generating unit or CGU).
The future recoverability of the property, plant and equipment, mine development and intangibles is dependent on a number of key 
factors including: uranium price, capex, life of mine, restart date, discount rates used in determining the estimated discounted cash 
flows, foreign exchanges rates, tax rates, the level of proved and probable reserves and measured, indicated and inferred mineral 
resources, future technological changes which could impact the cost of production and future legal changes, including changes to 
environmental restoration obligations.
Paladin did not identify any impairment indicators in relation to the Langer Heinrich Mine CGU.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
118

NOTE 19.  MINE DEVELOPMENT
2024 
US$’000
2023 
US$’000
Mine development – at cost
116,619
70,180
Less accumulated depreciation and impairment
(48,887)
(48,116)
Net carrying value – mine development
67,732
22,064
Net carrying value at start of year
22,064
14,975
Transfer in from Construction Work in Progress
39,086
-
Additions
9,195
-
Depreciation and amortisation expense
(771)
-
Transfer from Exploration & Evaluation assets on commencement of Restart Project
-
7,089
Adjustment to base amount of mine rehabilitation
(1,842)
-
Net carrying value at end of year
67,732
22,064
Recognition and Measurement
Mine Development
Pre-production costs are deferred as development costs until such time as the asset is capable of being operated in a manner intended 
by management and depreciated on a unit of production basis. Post-production costs are recognised as a cost of production.
Significant Judgements, Estimates and Assumptions
Capitalisation of Pre-production Costs
Included in Mine Development costs are pre-production costs amounting to US$9.2M recognised in the period. These costs relate to 
the costs incurred in bringing the LHM assets to the location and condition necessary for them to be capable of being operated in the 
manner intended by management. Capitalisation of pre-production costs was reduced as the LHM was progressively recommissioned 
until capitalisation of costs ceased at 31 March 2024.
Change in Accounting Estimate
As a result of the decision to return the LHM to production, there has been a change in the basis for depreciating the LHM. Whilst the 
LHM was in Care and Maintenance, relevant tangible non-current assets were depreciated using the Straight Line method. From  
1 July 2022, the basis of depreciation has changed prospectively to the units of production method over the remaining useful life of the 
assets resulting in a depreciation charge for those assets for the year amounting to US$0.8M (2023: Nil). Depreciation charges under 
the unit of production method commenced from 1 April 2024, this has resulted in an increase in depreciation charges for the period 
amounting to US$:0.7M (2023: decrease of US$1.8M).
Proved and Probable Reserves
The Group uses the concept of a life of mine as an accounting value to determine such things as depreciation rates and the appropriate 
period to discount mine closure provisions. In determining life of mine, the proved and probable reserves measured in accordance with 
the 2012 edition of the JORC Code specific to a mine are taken into account which by their very nature require judgements, estimates 
and assumptions.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
119

NOTE 20.  EXPLORATION AND EVALUATION EXPENDITURE 
The following table details the expenditures on interests in mineral properties by area of interest for the year ended 30 June 2024:
Areas of interest
Valhalla/
Skal 
US$’000
Isa North 
US$’000
Carley Bore 
US$’000
Canada 
US$’000
Manyingee 
US$’000
Fusion 
US$’000
LHM 
US$’000
Total 
US$’000
Balance at 1 July 2022
39,636
8,082
7,965
30,602
7,636
317
7,089
101,327
Expenditure capitalised
99
187
32
1,470
81
74
-
1,943
Expenditure transferred to 
Mine Development costs
-
-
-
-
-
-
(7,089)
(7,089)
Foreign exchange 
differences
-
-
-
(860)
-
-
-
(860)
Balance at 30 June 2023
39,735
8,269
7,997
31,212
7,717
391
-
95,321
Expenditure capitalised
111
172
25
5,872
86
82
-
6,348
Foreign exchange 
differences
-
-
-
(937)
-
-
-
(937)
Balance at 30 June 2024
39,846
8,441
8,022
36,147
7,803
473
-
100,732
Recognition and Measurement
Exploration and evaluation expenditure related to areas of interest is capitalised and carried forward to the extent that:
1.	 Rights to tenure of the area of interest are current; and
2.	 Costs are expected to be recouped through successful development and exploitation of the area of interest or alternatively by 
its sale.
Exploration and evaluation expenditure is allocated separately to specific areas of interest. Such expenditure comprises net direct costs 
and an appropriate portion of related overhead expenditure directly related to activities in the area of interest.
Costs related to the acquisition of properties that contain Mineral Resources are allocated separately to specific areas of interest.
If costs are not expected to be recouped through successful development and exploitation of the area of interest, or alternatively by 
sale, costs are expensed in the period in which they are incurred.
Exploration and evaluation expenditure that is capitalised is included as part of cash flows from investing activities, whereas exploration 
and evaluation expenditure that is expensed is included as part of cash flows from operating activities.
When a decision to proceed to development is made, the exploration and evaluation capitalised to that area is transferred to mine 
development. All costs subsequently incurred to develop a mine prior to the start of mining operations within the area of interest are 
capitalised and carried at cost. These costs include expenditure incurred to develop new ore bodies within the area of interest, to 
define further mineralisation in existing areas of interest, and to expand the capacity of a mine and to maintain production.
Capitalised amounts for an area of interest may be written down to their recoverable amount if the area of interest’s carrying amount is 
greater than their estimated recoverable amount.
Since 30 June 2024, there have been no events or changes in circumstances to indicate that the carrying value may not 
be recoverable.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
120

NOTE 21.  INTANGIBLE ASSETS
2024  
US$’000
2023 
US$’000
Balance at 30 June 2024
Intangible assets – at cost
22,996
17,803
Less accumulated depreciation and impairment
(10,153)
(10,010)
Net carrying value – intangible assets
12,843
7,793
Amortisation of US$0.1M (2023: US$Nil) is included in inventory costs.
Movements in Intangible Assets
Movements in each group of intangible assets during the financial year are set out below: 
Right to 
Supply of 
Power
US$’000
Right to  
Supply of  
Water 
US$’000
Total
US$’000
2024
Net carrying value at 1 July 2023
2,183
5,610
7,793
Additions
2,312
2,881
5,193
Amortisation expense
(50)
(93)
(143)
Net carrying value at 30 June 2024
4,445
8,398
12,843
2023
Net carrying value at 1 July 2022
2,183
5,610
7,793
Amortisation expense
-
-
-
Net carrying value at 30 June 2023
2,183
5,610
7,793
Description of the Group’s Intangible Assets
1.	 Right to supply of power
LHU has entered into a contract with NamPower in Namibia for the right to access power at the LHM. In order to obtain this right, 
the power line connection to the mine was funded by LHU. However, ownership of the power line rests with NamPower. The amount 
funded is being amortised on a straight line basis.
2.	 Right to supply of water
LHU has entered into a contract with NamWater in Namibia for the right to access water at the LHM. In order to obtain this right, the 
water pipeline connection to the mine was funded by LHU. However, ownership of the pipeline rests with NamWater. The amount 
funded is being amortised on a straight line basis.
Recognition and Measurement
Intangible assets acquired separately or in a business combination are initially measured at cost. The cost of an intangible asset 
acquired in a business combination is its fair value as at the date of acquisition. Following initial recognition, intangible assets are 
carried at cost less any accumulated amortisation and any accumulated impairment losses. Internally generated intangible assets, 
excluding capitalised development costs, are not capitalised and expenditure is recognised in the Consolidated Income Statement in 
the year in which the expenditure is incurred.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
121

NOTE 21.  INTANGIBLE ASSETS (CONTINUED)
The useful lives of intangible assets are assessed to be either finite or indefinite. Intangible assets with finite lives are amortised over 
the useful life and tested for impairment whenever there is an indication that the intangible asset may be impaired. The amortisation 
period and the amortisation method for an intangible asset with a finite useful life are reviewed at least at each financial year-end. 
Changes in the expected useful life or the expected pattern of consumption of future economic benefits embodied in the asset are 
accounted for prospectively by changing the amortisation period or method, as appropriate, which is a change in accounting estimate. 
The amortisation expense on the intangible assets with finite lives is recognised in profit or loss in the expense category consistent 
with the function of the intangible asset.
A summary of the policies applied to the Group’s intangible assets is as follows:
Right to use water and power supply
Useful lives	
Life of mine
Amortisation method used	
Units of production method
Impairment testing	
Annually and more frequently when an indication of impairment exists
Significant Judgements, Estimates and Assumptions
Change in Accounting Estimate
As a result of the decision to return the LHM to production, there has been a change in the basis for depreciating the LHM. Whilst the 
LHM was in Care and Maintenance, relevant in tangible non-current assets were depreciated using the Straight Line method. From  
1 July 2022, the basis of depreciation has changed prospectively to the units of production method over the remaining useful life of the 
assets resulting in a US$0.14M (2023: US$Nil) depreciation charge for those assets for the period. 
NOTE 22.  TRADE AND OTHER PAYABLES
2024
US$’000
2023
US$’000
Current
Trade and other payables
15,122
9,094
Total current payables
15,122
9,094
Trade payables are unsecured, non-interest bearing and are normally settled on 30 day terms.
Recognition and Measurement
Trade and other payables are carried at amortised cost and represent liabilities for goods and services provided to the Group prior to 
the end of the financial year that are unpaid and arise when the Group becomes obliged to make future payments in respect of the 
purchase of these goods and services. 
NOTE 23.  LEASE LIABILITIES
2024
US$’000
2023
US$’000
Current
Lease liabilities
658
159
Total current lease liabilities
658
159
Non-Current
Lease liabilities
1,342
622
Total non-current lease liabilities
1,342
622
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
122

NOTE 24.  PROVISIONS
2024
US$’000
2023
US$’000
Current
Employee benefits
803
331
Total current provisions
803
331
Non-Current
Employee benefits
167
124
Environmental rehabilitation provision
40,525
37,925
Total non-current provisions
40,692
38,049
Movements in Provisions
Movements in provisions during the financial year are set out below:
Employee  
Benefits
US$’000
Environmental 
Rehabilitation
US$’000
Total
US$’000
Balance at 1 July 2023
455
37,925
38,380
Change in cost estimates
537
(866)
(329)
Impact of changes to discount and inflation rates
-
(976)
(976)
Unwinding of discount rate
-
3,205
3,205
Foreign currency movements
20
1,237
1,257
Released during the year
(42)
-
(42)
Balance at 30 June 2024
970
40,525
41,495
Employee  
Benefits
US$’000
Environmental 
Rehabilitation
US$’000
Total
US$’000
Balance at 1 July 2022
471
40,407
40,878
Change in cost estimates
187
3,091
3,278
Impact of changes to discount and inflation rates
-
2,883
2,883
Unwinding of discount rate
-
3,249
3,249
Impact of discounting on changes to cost estimates and timing changes
-
(5,974)
(5,974)
Foreign currency movements
(36)
(5,731)
(5,767)
Released during the year
(167)
-
(167)
Balance at 30 June 2023
455
37,925
38,380
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
123

NOTE 24.  PROVISIONS (CONTINUED)
Nature and Timing of Provisions
Environmental Rehabilitation
A provision for environmental rehabilitation and mine closure has been recorded in relation to the LHM. A provision is made for 
rehabilitation work when the obligation arises and this is recognised as a cost of production or development as appropriate. 
Additionally, the provision includes the costs of dismantling and demolition of infrastructure or decommissioning, the removal of 
residual material and the remediation of disturbed areas specific to the infrastructure to a state acceptable to various authorities.
Recognition and Measurement
Provisions
Mine closure and restoration costs include the costs of dismantling and demolition of infrastructure or decommissioning, the removal 
of residual material and the remediation of disturbed areas specific to the infrastructure. Mine closure costs are provided for in the 
accounting period when the obligation arising from the related disturbance occurs, whether this occurs during the mine development 
or during the production phase, based on the net present value of estimated future costs.
As the value of the provision for mine closure represents the discounted value of the present obligation to restore, dismantle and close 
the mine, the increase in this provision due to the passage of time is recognised as a finance cost. The discount rate used is a pre-tax 
rate that reflects the current market assessment of the time value of money and the risks specific to the liability. Foreign exchange 
movements are treated as a finance component and recognised in the Consolidated Income Statement.
Provision is made for rehabilitation work when the obligation arises, and this is recognised as a cost of production or development. 
The rehabilitation costs provided for are the present value of the estimated costs to restore operating locations. The value of the 
provision represents the discounted value of the current estimate to restore and the discount rate used is the pre-tax rate that reflects 
the current market assessments of the time value of money and the risks specific to the liability.
Employee benefits
Short-term Benefits
Liabilities for short-term benefits, including wages and salaries, and accumulating annual leave expected to be settled within 12 months 
of the reporting date are recognised as a current liability in respect of employees’ services up to the reporting date and are measured 
at the amounts expected to be paid when the liabilities are settled.
Long Service Leave
The liability for long service leave is recognised in the provision for employee benefits and measured as the present value of expected 
future payments to be made in respect of services provided by employees up to the reporting date. Consideration is given to expected 
future wage and salary levels, experience of employee departures and periods of service. Expected future payments are discounted 
using market yields at the reporting date on corporate bonds with terms to maturity and currency that match, as closely as possible, 
the estimated future cash outflows.
Significant Accounting Judgements, Estimates and Assumptions
Environmental Rehabilitation Provision
The value of this provision represents the discounted value of the present obligation to rehabilitate the mine and to restore, dismantle and 
close the mine. The discounted value reflects a combination of management’s assessment of the cost of performing the work required, 
the timing of the cash flows and the discount rate. A change in any, or a combination, of the three key assumptions (estimated cash flows, 
discount rates or inflation rates), used to determine the provision could have a material impact to the carrying value of the provision.
NOTE 25.  EMPLOYEE SHARE RIGHTS PLAN
In 2009, Paladin implemented an Employee Performance Share Rights Plan (the 2009 Employee Share Rights Plan) together with a 
Contractor Performance Share Rights Plan (the Contractor Rights Plan). These plans are referred to jointly as the Rights Plans and were 
reaffirmed by shareholders at the 2018 Annual General Meeting. The Rights Plans terms were amended and approved by shareholders 
at the 2020 Annual General Meeting (2020 Employee Share Rights Plan).
The Rights Plan are the mechanism under which Employees have been awarded:
•	 Performance Rights (PR)
•	 Long Term Incentive Plan Performance Rights (LTIP)
•	 Share Appreciation Rights (SAR) (previous incentive grant – no longer utilised for new incentive grants)
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
124

NOTE 25.  EMPLOYEE SHARE RIGHTS PLAN (CONTINUED)
(a) 
Description of share based payment arrangements
(i)	
Commencement and Retention Rights 
Performance Rights were issued to Executives appointed in FY2022 and FY2023 at the commencement of their 
employment. These Performance Rights were provided as a mechanism to attract and retain Executives in the current 
market. These Performance Rights have a two-year vesting period and are contingent on continued employment with the 
Company. 
Performance Rights were also issued to employees in FY2022 and FY2023 as a mechanism to attract and retain 
employees in the current market. These Performance Rights have a 12 month and 24 month vesting period and are 
contingent on continued employment with the Company.
Under the Share Rights Plan these Performance Rights may be settled in equity, cash or a combination thereof.
(ii)	
Long-Term Incentive Plan
The LTIP is an ‘at-risk’ component of the remuneration intended to align the interests of Executive KMP and employees 
with long-term shareholder returns. It is an equity-based award designed to attract, motivate and retain employees. 
The Performance Rights issued as part of the LTIP vest over a three year period. Performance Measures include both 
a component related to a service period and a component related to Total Shareholder Return (r-TSR) as it aligns 
participants’ remuneration with the return received by shareholders and reflects creation of shareholder value compared 
to peers. The FY2023 LTIP also contained a further component related solely to a service period.
Under the Share Rights Plan these Performance Rights may be settled in equity, cash or a combination thereof.
(iii)	
Share Appreciation Rights
Paladin has historically granted Share Appreciation Rights to employees including Executives under the Rights Plan. 
The Share Appreciation Rights carry no dividend or voting rights. When exercisable, each Share Appreciation Rights is 
convertible into one ordinary share of Paladin Energy Ltd. The exercise price of Share Appreciation Rights is based on the 
weighted average price at which the Company’s shares are traded on the ASX during the five business days up to and 
including the date of grant.
(b) 
Employee share ownership plans
The Paladin Employee Share Trust is a discretionary trust for the benefit of employees of Paladin Limited and its subsidiaries.
The trustee for the trust (CPU Share Plans Pty Ltd) is an independent company based in Australia. The Trust utilises funds 
supplied by Paladin Limited and/or its subsidiaries to purchase shares to facilitate awards to be made or satisfied under the 
employee share ownership plans.
The shares may be purchased by subscription or on market.
(c) 
Recognition and Measurement
The fair value at grant date of Share Appreciation Rights and Performance Rights is charged to the Consolidated Income 
Statement, net of tax, over the period for which the benefits of employee services are expected to be derived. The 
corresponding accrued employee entitlement is recorded in the share based payments reserve.
Where awards are forfeited because non-market based vesting conditions are not satisfied, the expense previously recognised 
is proportionally reversed. If awards do not vest due to a market performance condition not being met, the expense is 
recognised in full, and the share based payments reserve is released to retained earnings.
The fair value of Share Appreciation Rights is measured using a Black Scholes model. This model considers the following:
–  Expected life of the award;
–  Current market price of the underlying shares;
–  Expected volatility;
–  Expected dividends; and
–  Risk-free interest rate
The Commencement and Retention Rights have been valued with reference to the Paladin share price on grant date.
The Performance Rights subject to r-TSR conditions have been independently valued using a hybrid employee share option 
pricing model which uses a correlated simulation that simultaneously calculates the returns from the Company’s and the 
individual peer group companies’ r-TSR (for Peer Groups 1 and 2) on a risk-neutral basis as at the vesting date with regards to 
the remaining performance measurement period.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
125

NOTE 25.  EMPLOYEE SHARE RIGHTS PLAN (CONTINUED)
(d) 
Reconciliation of employee share rights (post consolidation of issued capital)
Share Rights
Rights at the 
beginning of 
the year
Granted 
during the 
period
Vested 
during the 
period
Forfeited 
during the 
period
Lapsed 
during the 
period
Rights at the 
end of the 
year
Commencement and Retention Rights
473,500
70,000
(302,750)
-
-
240,750
LTI Performance Rights
1,017,233
608,984
(126,965)
-
-
1,499,252
Share Appreciation Rights
287,850
-
(24,800)
-
-
263,050
Total
1,778,583
678,984
(454,515)
-
-
2,003,052
The weighted average share price of Performance Rights vested during the year was US$6.76 (A$10.33) and for the Share 
Appreciation Rights was US$6.38 (A$9.74).
(e) 
Expenses arising from share-based payment transactions 
Total expenses arising from share-based payment transactions recognised during the period as part of employee benefit 
expense were as follows
2024 
US$’000
2023 
US$’000
Commencement and Retention Rights
419
2,039
LTI Performance Rights
3,158
2,039
Share Appreciation Rights
-
14
Total share based payment expense
3,577
4,092
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
126

OTHER NOTES
NOTE 26.  KEY MANAGEMENT PERSONNEL
Details of Key Management Personnel
1	 Directors
Mr Cliff Lawrenson	
Chair (Non-Executive)
Mr Peter Watson	
Director (Non-Executive)
Mr Peter Main	
Director (Non-Executive)
Ms Melissa Holzberger	
Director (Non-Executive) (resigned as Non-Executive Director 23 August 2024)
Ms Joanne Palmer	
Director (Non-Executive)
Dr Jon Hronsky OAM	
Director (Non-Executive) 
Mrs Lesley Adams	
Director (Non-Executive) 
2	 Executives
Mr Ian Purdy	
Chief Executive Officer
Mr Paul Hemburrow	
Chief Operating Officer
Ms Anna Sudlow	
Chief Financial Officer
Mr Jess Oram	
General Manager Exploration (ceased being a Key Management Person 30 June 2023)
Mr Alex Rybak	
Chief Commercial Officer
Compensation of Key Management Personnel: Compensation by Category
2024 
US$
2023
US$
Short-term employee benefits
1,825,020
1,581,346
Post-employment benefits
140,011 
140,480 
Share-based payments 
1,683,085 
1,785,237 
3,648,116 
3,507,063 
Short-term employee benefits include payments to Dr Jon Hronsky towards the provision of consulting services to Paladin Energy Ltd 
of US$Nil (A$Nil), (2023: US$8k, A$13k). These services were provided on an arms-length, commercial basis and were approved by 
the Board.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
127

NOTE 27.  AUDITOR’S REMUNERATION
The auditor of the Paladin Energy Ltd Group is PricewaterhouseCoopers.
2024
US$
2023
US$
Amounts received or due and receivable by PricewaterhouseCoopers (Australia) for:
Audit or review of the financial report of the consolidated Group
151,027
115,996
Other assurance services
66,705
-
Total audit and assurance services
217,732
115,996
Other services
15,055
-
Taxation services:
    Tax compliance services
64,469
63,639
    International tax consulting
36,381
5,459
    Other tax advice
76,285
1,637
Total other services
177,135
70,735
Total fees received or due and receivable by PricewaterhouseCoopers (Australia) 
409,922
186,731
Amounts received or due and receivable by related practices of PricewaterhouseCoopers (Australia) for:
Audit or review of the financial report of subsidiaries and audit related services
52,987
32,596
Other services
6,861
13,058
Taxation services:
    Tax compliance services
4,073
398
Total fees received or due and receivable by related practices of PricewaterhouseCoopers (Australia)
63,921
46,052
    Total
473,843
232,783
NOTE 28.  COMMITMENTS AND CONTINGENCIES
There were no outstanding commitments or contingencies, which are not disclosed in the Financial Report of the Group as at  
30 June 2024 other than:
2024
US$’000
2023
US$’000
Tenements 
Commitments for tenements contracted for at the reporting date but not recognised as liabilities, payable:
Within one year
130
377
Later than one year but not later than 5 years
4,337
3,389
More than 5 years
268
433
Total tenements commitment
4,735
4,199
These include commitments relating to tenement lease rentals and the minimum expenditure requirements of the Namibian, Canadian, 
Western Australian and Queensland Mines Departments attaching to the tenements and are subject to re-negotiation upon expiry of 
the exploration leases or when application for a mining licence is made.
These are necessary in order to maintain the tenements in which the Group and other parties are involved. All parties are committed to 
meet the conditions under which the tenements were granted in accordance with the relevant mining legislation in Namibia, Australia 
and Canada.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
128

NOTE 28.  COMMITMENTS AND CONTINGENCIES (CONTINUED)
In relation to the Manyingee Project, the re-negotiated acquisition terms provide for a payment of A$0.75M (US$0.5M)  
(2023: A$0.75M (US$0.5M)) by the Group to the vendors when all project development approvals are obtained.
Other Commitments
Commitments for transport, capital, purchase order commitments, fuel and utilities and other supplies contracted for at the reporting 
date but not recognised as liabilities, payable:
2024 
US$’000
2023 
US$’000
Within one year
13,192
52,477
Later than one year but not later than 5 years
757
703
More than 5 years 
200 
376 
Total other commitments 
14,149 
53,556 
Future sales commitments
At 30 June 2024 Paladin has contracted approximately 50%1, of estimated production to CY2030. The contracted sales portfolio 
consists of short and long-term sales commitments. The contracts are executed well in advance of a delivery and include fixed-price, 
base-escalated and market-related pricing. Total revenue from these contracts cannot be reliably estimated as the transaction sales 
price will not be known until the time of delivery.
The sales contracts are denominated in US dollars.
Contingent liabilities
There are certain legal claims or potential claims against the Group, the outcome of which cannot be foreseen at present, and for which 
no amounts have been disclosed. It is expected that any liabilities arising from such legal action would not have a material effect on the 
Group’s financial performance.
Bank Guarantees
As at 30 June 2024 the Group has outstanding US$0.4M (A$$0.6M)) (2023: US$0.1M (A$0.2M)) as a current guarantee provided by 
a bank for the corporate office lease; a US$0.01M (A$0.02M) (2023: US$0.01M (A$0.02M)) guarantee for tenements and US$0.2M 
(A$0.1M and C$0.2M) (2023: US$0.1M (A$0.01M and C$0.01M)) guarantee for corporate credit cards.
NOTE 29.  RELATED PARTIES
Key Management Personnel
Except as disclosed below the only related party transactions are with Directors and Key Management Personnel. Refer to Note 26. 
Details of material-controlled entities are set out in Note 30. 
Loans from related parties – LHU’s loans from CNNC (refer to Note 6)
Non-Current
2024 
US$’000 
2023 
US$’000 
Balance at 1 July 2023 
89,708 
78,558 
Drawdowns
- 
85 
Interest charged
4,048
3,564
Accretion expense
3,561
7,501
Balance at 30 June 2024  
97,317 
89,708 
1	
Based on Langer Heinrich Uranium Life of Mine production to CY2030, as detailed in the ASX Announcement “Langer Heinrich Mine Restart Plan Update, Mineral Resource and 
Ore Reserve Update” dated 4 November 2021. All material assumptions underpinning the production target continue to apply and have not materially changed. Based on nominal 
contract volumes of executed offtake agreements. Assumes CNNC takes 25% of production post 2025 (Life of Mine offtake).
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
129

NOTE 30.  GROUP INFORMATION
Information Relating to Paladin Energy Ltd (Parent)
2024
US$’000
2023
US$’000
Current assets
42,874
118,502
Total assets
468,802
129,338
Current liabilities
36,287
815
Total liabilities
52,649
12,756
Issued capital
2,649,226
2,646,644
Accumulated losses
(2,287,138)
(2,582,911)
Option application reserve	
137
137
Share-based payments reserve
53,928
53,155
Revaluation reserve
-
(443)
Total shareholders’ equity
416,153
116,582
Net profit after tax from operations
(342,173)
(34,760)
Total comprehensive loss
(342,173)
(34,760)
The financial information for the parent entity has been prepared on the same basis as the consolidated financial statements, except as 
set out below.
Investments in subsidiaries, associates and joint venture entities
Investments in subsidiaries, associates and joint venture entities are accounted for at cost in the financial statements of Paladin 
Energy Ltd. Dividends received from associates are recognised in the parent entity’s profit or loss when its right to receive the dividend 
is established.
Details of Any Contingent Liabilities of the Parent Entity
Paladin has recognised a provision of US$40.5M (2023: US$37.9M) for the LHM environmental rehabilitation.
Tax Consolidation
Paladin and its 100% owned Australian resident subsidiaries formed a tax consolidated group (the Group) with effect from 1 July 2003. 
Paladin is the head entity of the Group. Members of the Group have entered into a tax-sharing agreement that provides that the head 
entity will be liable for all taxes payable by the Group from the consolidation date. The parties have agreed to apportion the head 
entity’s taxation liability within the Group based on each contributing member’s share of the Group’s taxable income and losses.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
130

NOTE 30.  GROUP INFORMATION (CONTINUED)
Investments in Material Controlled Entities
Name
Country of  
Incorporation
Percentage
Interest Held
2024
%
2023
%
Paladin Energy Minerals NL
Australia
100
100
Paladin Finance Pty Ltd
Australia
100
100
Langer Heinrich Mauritius Holdings Ltd 1
Mauritius
75
75
Langer Heinrich Uranium (Pty) Ltd
Namibia
75
75
Valhalla Uranium Pty Ltd
Australia
100
100
Summit Resources Ltd
Australia
100
100
Summit Resources (Aust) Pty Ltd
Australia
100
100
Aurora Energy Ltd 2
Canada
100
75
All investments comprise ordinary shares and all shares held are unquoted.
NOTE 31.  EVENTS AFTER THE BALANCE DATE
Other than disclosed below, since the end of the financial year, the Directors are not aware of any other matter or circumstance not 
otherwise dealt with in this report, that has significantly or may significantly affect the operations of the Group, the results of those 
operations or the state of affairs of the Group in subsequent periods with the exception of the following, the financial effects of which 
have not been provided for in the 30 June 2024 Financial Report.
On 24 June 2024 Paladin announced it had entered into a definitive arrangement agreement, pursuant to which Paladin will acquire 
100% of the issued and outstanding shares of Fission Uranium Corp. (Fission) by way of a court approved plan of arrangement (the 
Transaction) under the Canada Business Corporation Act. At the publication date, Fission has announced a postponement of the 
Special Meeting of Securityholders to 9 September 2024. Fission advised that based on a preliminary assessment of votes received 
by Fission’s proxy solicitor, the majority of the votes received to date are in favour, but are not sufficient to approve the Transaction as 
nearly half of eligible shareholders have yet to submit their proxies. The postponement of the Meeting is intended to provide additional 
time for all Securityholders to have the opportunity to make their voices heard.
Ms Melissa Holzberger resigned as Non-Executive Director effective 23 August 2024.
1	
Langer Heinrich Mauritius Holdings Ltd owns 100% of Langer Heinrich Uranium (Pty) Ltd.
2	
Aurora Energy Ltd recognises a 100% interest in the Michelin Project in Canada (FY2023: 75%). In prior years, Aurora Energy Ltd equity accounted it's interest in a special 
purpose joint venture (the Michelin Joint Venture) which owned the Michelin Project in Canada. The Michelin Joint Venture included a farm out agreement over a five-year period 
whereby Paladin received an additional 5% participating interest in the Michelin Project on an annual basis until May 2023, in return for Paladin funding all obligations for the 
Michelin Project over this period.
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
PALADIN ENERGY ANNUAL REPORT 2024
131

132
PAL ADIN ENERGY ANNUAL REPORT 2024
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
NOTE 32.  NEW ACCOUNTING STANDARDS AND INTERPRETATIONS
Accounting Standards and Interpretations issued but not yet effective
The following Australian Accounting Standards that have recently been issued or amended but are not yet effective are relevant to the 
Group but have not been applied by the Group for the annual reporting period ending 30 June 2024:
Reference/ Title
Summary
Application date of 
standard*
Application date for 
Group*
AASB 101: Presentation 
of Financial 
Statements - Classification 
of liabilities as current or 
non-current/with covenants 
(AASB 2020-1 and related 
amendments)
The amendments affect only the presentation of 
liabilities as current or non-current in the statement 
of financial position and not the amount or timing 
of recognition of any asset, liability, income or 
expenses, or the information disclosed about 
those items.
1 January 2024
1 July 2024
AASB 16: Lease liability in a sale 
and leaseback (AASB 2022-5)
Amendment requires a seller-lessee to 
subsequently measure lease liabilities arising from 
a sale and leaseback transaction in a way that does 
not result in recognition of a gain or loss that relates 
to the right of use it retains. This is achieved by 
requiring the expected variable lease payments to 
be included in the lease liability. This is the only type 
of lease liability that includes variable payments 
as all ‘normal’ lease liabilities only include fixed 
payments (do not include variable lease payments 
which do not depend on an index or rate).
1 January 2024
1 July 2024
AASB 107 / AASB 7: Supplier 
finance arrangements (AASB 
2023-1)
AASB 107 Statement of Cash Flows requires entities 
to provide qualitative and quantitative information 
about its supplier finance arrangements.
AASB 7 Financial Instruments: Disclosures by adding 
supplier finance arrangements as an example within 
the requirements to disclose information about an 
entity’s exposure to concentration of liquidity risk.
1 January 2024
1 July 2024
AASB 10/AASB 128: Sale or 
contribution of assets between 
an Investor and its associate 
or joint venture (AASB 2014-10 
and related amendments)
Amendment deals with situations where there is a 
sale or contribution of assets between an investor 
and its associate or joint venture.
Specifically, the amendments state that gains 
or losses resulting from the loss of control of a 
subsidiary that does not contain a business in a 
transaction with an associate or a joint venture 
that is accounted for using the equity method, are 
recognised in the parent’s profit or loss only to the 
extent of the unrelated investors’ interests in that 
associate or joint venture. Similarly, gains and losses 
resulting from the remeasurement of investments 
retained in any former subsidiary (that has become 
an associate or a joint venture that is accounted 
for using the equity method) to fair value are 
recognised in the former parent’s profit or loss only 
to the extent of the unrelated investors/ interests in 
the new associate or joint venture.
1 January 2025
1 July 2025

133
PAL ADIN ENERGY ANNUAL REPORT 2024
Notes to the Consolidated Financial Statements (continued)
For the year ended 30 June 2024
AASB 1/AASB 121: Lack of 
exchangeability (AASB 2023-5)
Amendment specifies how to assess whether a 
currency is exchangeable and how to determine the 
exchange rate when it is not.
When a currency is not exchangeable at the 
measurement date, an entity is required to estimate 
the spot exchange rate as the rate that would have 
applied to an orderly exchange transaction at the 
measurement date between market participants 
under prevailing economic conditions. In that case, 
an entity is required to disclose information that 
enables users of its financial statements to evaluate 
how the currency’s lack of exchangeability affects, 
or is expected to affect, the entity’s financial 
performance, financial position and cash flows.
An entity is not permitted to apply the amendments 
retrospectively. Instead, an entity is required to 
apply the specific transition provisions included in 
the amendments.
1 January 2025
1 July 2025
*	 Designates the beginning of the applicable annual reporting period unless otherwise stated.
The Group has considered what impact these new Accounting Standards will have on the financial statements, when applied next year, 
and have concluded that they will have no material impact. 
The Group has elected not to early adopt these new standards or amendments in the financial statements.
For Standards and Interpretations effective from 1 July 2024, it is not expected that the new Standards and Interpretations will 
significantly affect the Group’s financial performance and position.
NOTE 32.  NEW ACCOUNTING STANDARDS AND INTERPRETATIONS (CONTINUED)

134
PAL ADIN ENERGY ANNUAL REPORT 2024
Consolidated Entity Disclosure Statement
For the year ended 30 June 2024
As at 30 June 2024
Name of entity
Type of entity
Trustee, partner, 
or participant 
in JV
% of share 
capital
Place of 
business/country 
of incorporation
Australian 
resident or 
foreign resident
Foreign 
jurisdiction(s) of 
foreign residents
Paladin Energy Ltd
Body corporate
-
n/a
Australia
Australian
n/a
Fusion Resources Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Summit Resources Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Pacific Mines Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Summit Resources (Aust) 
Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin NT Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Valhalla Uranium Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Eden Creek Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin Intellectual 
Property Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin Finance Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin Nuclear Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin Employee Plan 
Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Paladin Energy Minerals 
Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
PEM Malawi Pty Ltd
Body corporate
-
100%
Australia
Australian
n/a
Aurora Energy Ltd
Body corporate
-
100%
Canada
Foreign
Canada
1000927136 Ontario Inc.
Body corporate
-
100%
Canada
Foreign
Canada
Langer Heinrich Mauritius 
Holdings Limited
Body corporate
-
75%
Mauritius
Foreign
Mauritius
Langer Heinrich Uranium 
(Pty) Ltd
Body corporate
-
75%
Namibia
Foreign
Namibia
Paladin Employee  
Share Trust
Trust
CPU Share Plans 
Pty Limited
n/a
Australia
Australia
n/a
Basis of Preparation
This consolidated entity disclosure statement (CEDS) has been prepared in accordance with the Corporations Act 2001 and includes 
information for each entity that was part of the consolidated entity as at the end of the financial year in accordance with AASB 10 
Consolidated Financial Statements.
Determination of Tax Residency
Section 295 (3A)(vi) of the Corporation Act 2001 defines tax residency as having the meaning in the Income Tax Assessment Act 1997. 
The determination of tax residency involves judgement as there are different interpretations that could be adopted, and which could 
give rise to a different conclusion on residency.
In determining tax residency, the consolidated entity has applied the following interpretations:
•	 Australian tax residency 
The consolidated entity has applied current legislation and judicial precedent, including having regard to the Tax Commissioner’s 
public guidance in Tax Ruling TR 2018/5
•	 Foreign tax residency
Where necessary, the consolidated entity has used independent tax advisers in foreign jurisdictions to assist in its determination of tax 
residency to ensure applicable foreign tax legislation has been complied with (see section 295(3A)(vii) of the Corporations Act 2001).
Partnerships and Trusts
Australian tax law generally does not contain corresponding residency tests for partnerships and trusts and these entities are typically 
taxed on a flow-through basis. Additional disclosures on the tax status of partnerships and trusts have been provided where relevant.

Directors’ Declaration
For the year ended 30 June 2024
135
PAL ADIN ENERGY ANNUAL REPORT 2024
1.	
In the opinion of the Directors’ of Paladin Energy Ltd:
a)	 The consolidated financial statements and notes that are set out on pages 84 to 133, are in accordance with the Corporations 
Act 2001, including:
i)	
giving a true and fair view of the consolidated entity’s financial position as at 30 June 2024 and of its performance for the 
financial year ended on that date; and
ii)	 complying with Australian Accounting Standards (including the Australian Accounting Interpretations) and the Corporations 
Regulations 2001.
b)	 The financial statements and notes also comply with International Financial Reporting Standards as disclosed in Note 3 to the 
Financial Statements. 
c)	 There are reasonable grounds to believe that the Company will be able to pay its debts as and when they become due 
and payable.
d)	 The consolidated entity disclosure statement on page 134 is true and correct.
2.	 This declaration has been made after receiving the declarations required to be made in accordance with section 295A of the 
Corporations Act 2001 for the financial year ending 30 June 2024 (section 295A Declarations). The section 295A Declarations 
have been made by the Chief Executive Officer, Ian Purdy and the Chief Financial Officer, Anna Sudlow. 
Dated this 29th day of August 2024.
On behalf of the Board
Cliff Lawrenson
Chair
Perth, Western Australia

136
PAL ADIN ENERGY ANNUAL REPORT 2024
PricewaterhouseCoopers, ABN 52 780 433 757  
Brookfield Place, Level 15, 125 St Georges Terrace, PERTH WA 6000, GPO Box D198, PERTH WA 6840 
T: +61 8 9238 3000, F: +61 8 9238 3999, www.pwc.com.au  
Liability limited by a scheme approved under Professional Standards Legislation. 
Independent auditor’s report 
To the members of Paladin Energy Ltd 
Report on the audit of the financial report 
Our opinion 
In our opinion: 
The accompanying financial report of Paladin Energy Ltd (the Company) and its controlled entities 
(together the Group) is in accordance with the Corporations Act 2001, including: 
(a)
giving a true and fair view of the Group's financial position as at 30 June 2024 and of its
financial performance for the year then ended
(b)
complying with Australian Accounting Standards and the Corporations Regulations 2001.
What we have audited 
The financial report comprises: 

the consolidated statement of financial position as at 30 June 2024

the consolidated statement of comprehensive income for the year then ended

the consolidated statement of changes in equity for the year then ended

the consolidated statement of cash flow for the year then ended

the consolidated income statement for the year then ended

the notes to the consolidated financial statements, including material accounting policy
information and other explanatory information

the consolidated entity disclosure statement as at 30 June 2024

the directors’ declaration.
Basis for opinion 
We conducted our audit in accordance with Australian Auditing Standards. Our responsibilities under 
those standards are further described in the Auditor’s responsibilities for the audit of the financial 
report section of our report. 
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis 
for our opinion. 
Independence 
We are independent of the Group in accordance with the auditor independence requirements of the 
Corporations Act 2001 and the ethical requirements of the Accounting Professional & Ethical 
Standards Board’s APES 110 Code of Ethics for Professional Accountants (including Independence 
Standards) (the Code) that are relevant to our audit of the financial report in Australia. We have also 
fulfilled our other ethical responsibilities in accordance with the Code. 

137
PAL ADIN ENERGY ANNUAL REPORT 2024
Our audit approach 
An audit is designed to provide reasonable assurance about whether the financial report is free from 
material misstatement. Misstatements may arise due to fraud or error. They are considered material if 
individually or in aggregate, they could reasonably be expected to influence the economic decisions of 
users taken on the basis of the financial report. 
We tailored the scope of our audit to ensure that we performed enough work to be able to give an 
opinion on the financial report as a whole, taking into account the geographic and management 
structure of the Group, its accounting processes and controls and the industry in which it operates. 
Audit Scope 

Our audit focused on where the Group made subjective judgements; for example, significant
accounting estimates involving assumptions and inherently uncertain future events.

In establishing the overall approach to the Group audit, we determined the type of work that
needed to be performed by the group engagement team and by the component auditor in
Namibia operating under our instruction. We structured our audit as follows:
o
The component auditor performed audit procedures on the financial information of Langer
Heinrich Uranium (Pty) Ltd.
o
The Group engagement team performed audit procedures, as required due to their financial
significance, on the financial information of the Group's remaining subsidiaries.
o
The Group engagement team and component auditor had active dialogue throughout the
year through discussions, review of audit working papers and written instructions and
reporting
Key audit matters 
Key audit matters are those matters that, in our professional judgement, were of most significance in 
our audit of the financial report for the current period. The key audit matters were addressed in the 
context of our audit of the financial report as a whole, and in forming our opinion thereon, and we do 
not provide a separate opinion on these matters. Further, any commentary on the outcomes of a 
particular audit procedure is made in that context. We communicated the key audit matters to the 
Audit and Risk Committee. 
Key audit matter 
How our audit addressed the key audit matter 
Environmental rehabilitation provisions 
(Refer to note 24)  
As a result of its mining and processing 
operations, the Group is obliged to restore and 
rehabilitate the environment disturbed by these 
operations. 
Rehabilitation activities are governed by a 
combination of legislative and licence 
requirements. At 30 June 2024 the consolidated 
statement of financial position included 
We obtained the Group’s assessment of its 
obligations to rehabilitate disturbed areas and 
the estimated future cost of that work, which 
forms the basis for the environmental 
rehabilitation provision calculations (the model) 
for the Langer Heinrich Mine. We evaluated key 
assumptions utilised in this model by performing 
the following procedures, amongst others: 

138
PAL ADIN ENERGY ANNUAL REPORT 2024
Key audit matter 
How our audit addressed the key audit matter 
provisions for such obligations of US$40.5 
million. 
This was a key audit matter given the 
determination of these provisions required 
judgement in the assessment of the nature and 
extent of future works to be performed, the 
future cost of performing the works, the timing of 
when the rehabilitation will take place and 
economic assumptions such as the discount and 
inflation rates applied to future cash outflows 
associated with rehabilitation activities to bring 
them to their present value. 

Compared the rehabilitation costs being
estimated at Langer Heinrich to a
management’s expert assessment of the
rehabilitation obligation.

Examined significant changes in future cost
estimates from the prior year and assessed
of the reasonableness of inputs from the
updated 2024 life of mine plan used in these
estimates, focussing on the impact on the
timing and amount of expenditure required.

Assessed the timing of work to be performed
by comparison to mine plans and
environmental rehabilitation plans submitted
to relevant authorities.

Considered the appropriateness of the
discount and inflation rates utilised in
calculating the provision by comparing them
to current market consensus rates.
Carrying value of inventory – stockpile 
(Refer to note 16)  
In 2018 the Langer Heinrich Uranium Mine was 
placed into care and maintenance due to 
sustained low uranium spot prices. At that time, 
stockpile inventories were written down to a net 
realisable value of $Nil.  
During the current financial year, management 
prepared a detailed assessment of the net 
realisable value of inventory stockpiles (the 
model) for the Langer Heinrich Uranium Mine 
and concluded that the mine restart project had 
progressed to the point that there was sufficient 
evidence of an increase in the net realisable 
value of stockpile inventory and a reversal of the 
net realisable value write down of US$92.1 
million was recognised in the consolidated 
income statement.  
This was a key audit matter given the quantum 
of the net realisable value write down reversal 
and the judgement required in estimating future 
processing costs, the timing of inventory 
realisation and the expected revenue from the 
sale of processed inventory stockpiles. 
We evaluated key assumptions utilised in the 
model by performing the following procedures, 
amongst others: 
•
Agreed key inputs and estimates in the 
stockpile inventory computation to historical 
audited records, including the Reserve and 
Resources report prepared by 
management’s expert, uranium prices and 
pricing terms in a selection of signed 
customer contracts.
•
Tested the mathematical accuracy of the 
model as at 30 June 2024.
•
Performed enquiries and compared 
estimated future processing costs in the 
model to the actual cost of stockpile 
inventory processed during the current 
financial year.
•
Reconciled the stockpile quantities in the 
model as at 30 June 2024 to the survey 
report.

139
PAL ADIN ENERGY ANNUAL REPORT 2024
Key audit matter 
How our audit addressed the key audit matter 
Capitalisation of pre-production costs 
(Refer to note 18 and 19) 
During the year, the Group determined that the 
Langer Heinrich Uranium Mine achieved 
commercial production on 30 March 2024. 
Management has defined commercial 
production as bringing the asset to the location 
and condition necessary for it to be capable of 
operating in the manner intended by 
management. 
The determination of the date of commencing 
commercial production was a key audit matter 
due to the significant accounting and disclosure 
implications which arise from this determination 
and the subjective considerations involved. 
The date of commercial production establishes 
the point: 

when depreciation and amortisation should
recommence,

when pre-production costs should cease
being capitalised as part of Mine
development and Property, plant and
equipment, and

when pre-production costs should be
capitalised cost of inventory rather than a
costs of Property, plant and equipment.
To assess the date of commercial production 
and the related accounting implications, we 
performed the following audit procedures, 
amongst others: 

Inspected production data for the year in
order to assess ore grade, ore processing
and plant recovery rates and made enquiries
with management on the metrics used to
measure commercial production.

Considered whether the revenue and costs
incurred prior to the date of commercial
production were appropriately capitalised to
property, plant and equipment and mine
properties.

Assessed whether depreciation expense
charged against property, plant and
equipment and mine properties assets
recommenced on 30 March 2024.

Evaluated the reasonableness of the
disclosures made in Notes 18 and 19 by
reference to the requirements of the relevant
Australian Accounting Standards.
Other information 
The directors are responsible for the other information. The other information comprises the 
information included in the annual report for the year ended 30 June 2024, but does not include the 
financial report and our auditor’s report thereon. 
Our opinion on the financial report does not cover the other information and accordingly we do not 
express any form of assurance conclusion thereon through our opinion on the financial report. We 
have issued a separate opinion on the remuneration report. 
In connection with our audit of the financial report, our responsibility is to read the other information 
and, in doing so, consider whether the other information is materially inconsistent with the financial 
report or our knowledge obtained in the audit, or otherwise appears to be materially misstated. 

140
PAL ADIN ENERGY ANNUAL REPORT 2024
If, based on the work we have performed on the other information that we obtained prior to the date of 
this auditor’s report, we conclude that there is a material misstatement of this other information, we are 
required to report that fact. We have nothing to report in this regard. 
Responsibilities of the directors for the financial report 
The directors of the Company are responsible for the preparation of the financial report in accordance 
with Australian Accounting Standards and the Corporations Act 2001, including giving a true and fair 
view, and for such internal control as the directors determine is necessary to enable the preparation of 
the financial report that is free from material misstatement, whether due to fraud or error. 
In preparing the financial report, the directors are responsible for assessing the ability of the Group to 
continue as a going concern, disclosing, as applicable, matters related to going concern and using the 
going concern basis of accounting unless the directors either intend to liquidate the Group or to cease 
operations, or have no realistic alternative but to do so. 
Auditor’s responsibilities for the audit of the financial report 
Our objectives are to obtain reasonable assurance about whether the financial report as a whole is 
free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that 
includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that 
an audit conducted in accordance with the Australian Auditing Standards will always detect a material 
misstatement when it exists. Misstatements can arise from fraud or error and are considered material 
if, individually or in the aggregate, they could reasonably be expected to influence the economic 
decisions of users taken on the basis of the financial report. 
A further description of our responsibilities for the audit of the financial report is located at the Auditing 
and Assurance Standards Board website at: 
https://www.auasb.gov.au/admin/file/content102/c3/ar1_2020.pdf. This description forms part of our 
auditor's report. 

141
PAL ADIN ENERGY ANNUAL REPORT 2024
Report on the remuneration report 
Our opinion on the remuneration report 
We have audited the remuneration report included in the directors’ report for the year ended 30 June 
2024. 
In our opinion, the remuneration report of Paladin Energy Ltd for the year ended 30 June 2024 
complies with section 300A of the Corporations Act 2001. 
Responsibilities 
The directors of the Company are responsible for the preparation and presentation of the 
remuneration report in accordance with section 300A of the Corporations Act 2001. Our responsibility 
is to express an opinion on the remuneration report, based on our audit conducted in accordance with 
Australian Auditing Standards.  
PricewaterhouseCoopers 
Justin Carroll 
Perth
Partner 
29 August 2024

142
PAL ADIN ENERGY ANNUAL REPORT 2024
Additional information
Pursuant to the Listing Requirements of ASX as at 23 August 2024
1.	
Distribution and number of holders
Range
Total Holders
No. of Shares
1
-
1,000
16,935
5,306,511
1,001
-
5,000
5,199
11,926,155
5,001
-
10,000
954
6,994,018
10,001
-
100,000
744
17,821,528
100,001
-
maximum
58
256,931,311
23,890
298,979,523
2,190 shareholders hold less than a marketable parcel of shares.
2.	 The twenty largest shareholders hold 83.10% of the total shares issued
Holder
No. of Shares
%
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED
106,979,836
35.78
CITICORP NOMINEES PTY LIMITED
59,116,286
19.77
J P MORGAN NOMINEES AUSTRALIA PTY LIMITED
40,819,208
13.65
BNP PARIBAS NOMS PTY LTD
8,555,618
2.86
BNP PARIBAS NOMINEES PTY LTD 
6,063,528
2.03
NATIONAL NOMINEES LIMITED
4,745,492
1.59
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED - A/C 2
4,090,806
1.37
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 
3,224,646
1.08
BNP PARIBAS NOMINEES PTY LTD 
3,178,687
1.06
BNP PARIBAS NOMINEES PTY LTD 
1,946,396
0.65
MERRILL LYNCH (AUSTRALIA) NOMINEES PTY LIMITED
1,525,587
0.51
CITICORP NOMINEES PTY LIMITED 
1,269,971
0.42
BNP PARIBAS NOMS PTY LTD 
1,230,845
0.41
WASHINGTON H SOUL PATTINSON AND COMPANY LIMITED
920,000
0.31
XUE INVESTMENTS PTY LIMITED 
888,164
0.30
UBS NOMINEES PTY LTD
843,174
0.28
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 
830,598
0.28
HUICEN CAPITAL PTY LIMITED
827,714
0.28
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED
729,650
0.24
BNP PARIBAS NOMINEES PTY LTD 
661,953
0.22
248,448,159
83.10
The number of shares recorded as owned by substantial shareholders and their associates in the most recent substantial shareholder 
notices notified to Paladin are set out below:
Holder
No. of Shares
%
FMR LLC AND ITS ENTITIES
30,226,512
10.11
STATE STREET CORPORATION AND ITS SUBSIDIARIES
30,191,273
10.10
VANGUARD GROUP (THE VANGUARD GROUP, INC. AND ITS CONTROLLED ENTITIES)
150,359,437
5.044

143
PAL ADIN ENERGY ANNUAL REPORT 2024
Additional information (continued)
3.	 Voting Rights
Ordinary Shares
For all shares, voting rights are one vote per member on a show of hands and one vote per share in a poll. 
Share Appreciation Rights
There are no voting rights attached to Share Appreciation Rights. 
Performance Rights
There are no voting rights attached to Performance Rights. 
4.	 Unquoted securities
Unlisted Share Appreciation Rights
The Company has 263,050 Share Appreciation Rights on issue, issued in accordance with the Share Rights Plan approved by 
shareholders. 
Unlisted Performance Rights
The Company has 1,740,020 Performance Rights on issue.

144
PAL ADIN ENERGY ANNUAL REPORT 2024
Tenement information required by listing rule 5.20
Tenement
Location
Ownership
EPM 11898 
QLD, Australia
20%
EPM 13412 
QLD, Australia
20%
EPM 13413 
QLD, Australia
20%
EPM 13682 
QLD, Australia
20%
EPM 14233 
QLD, Australia
18%
EPM 14694 
QLD, Australia
20%
EPM 14712 
QLD, Australia
20%
EPM 14821 
QLD, Australia
20%
EPM 14935 
QLD, Australia
20%
EPM 15156 
QLD, Australia
20%
MDL 507 
QLD, Australia
100%
MDL 508 
QLD, Australia
100%
MDL 509 
QLD, Australia
100%
MDL 510 
QLD, Australia
100%
MDL 511 
QLD, Australia
100%
MDL 513 
QLD, Australia
100%
M08/86 
WA, Australia
100%
M08/87 
WA, Australia
100%
M08/88 
WA, Australia
100%
E08/1645 
WA, Australia
100%
E08/1646 
WA, Australia
100%
EL 6132 
SA, Australia
7.5%
ML 140 
Namibia, Africa
75%
ML 172 
Namibia, Africa
75%
025621M 
NL, Canada
100%
025675M 
NL, Canada
100%
025676M 
NL, Canada
100%
025681M 
NL, Canada
100%
035936M
NL, Canada
100%
035937M
NL, Canada
100%
035938M
NL, Canada
100%
035939M
NL, Canada
100%
035940M
NL, Canada
100%
035941M
NL, Canada
100%
035942M
NL, Canada
100%
Additional information
Tenement
Location
Ownership
035943M
NL, Canada
100%
035944M
NL, Canada
100%
035945M
NL, Canada
100%
035946M
NL, Canada
100%
035947M
NL, Canada
100%
035948M
NL, Canada
100%
035949M
NL, Canada
100%
035950M
NL, Canada
100%
035951M
NL, Canada
100%
035952M
NL, Canada
100%
035953M
NL, Canada
100%
035954M
NL, Canada
100%
035955M
NL, Canada
100%
035956M
NL, Canada
100%
035957M
NL, Canada
100%
035958M
NL, Canada
100%
035959M
NL, Canada
100%
036504M
NL, Canada
100%
036505M
NL, Canada
100%
036506M
NL, Canada
100%
036507M
NL, Canada
100%
036508M
NL, Canada
100%
036509M
NL, Canada
100%
036510M
NL, Canada
100%
036511M
NL, Canada
100%
036512M
NL, Canada
100%

145
PAL ADIN ENERGY ANNUAL REPORT 2024
Corporate Directory
DIRECTORS
Non-Executive Chair	
Mr Cliff Lawrenson
Non-Executive Directors 	
Mr Peter Main 
	
Mr Peter Watson
	
Ms Joanne Palmer 
	
Dr Jon Hronsky OAM
	
Mrs Lesley Adams 
Chief Executive Officer	
Mr Ian Purdy 
Company Secretary	
Mr Jeremy Ryan 
REGISTERED OFFICE  	
Level 11, 197 St Georges Terrace
	
Perth Western Australia 6000  
	
Telephone: (+61 8) 9423 8100 
	
Facsimile: (+61 8) 9381 4978 
	
Email: paladin@paladinenergy.com.au
	
Web: www.paladinenergy.com.au
SHARE REGISTRY	
Computershare Investor Services Pty Ltd 
	
Level 17, 221 St Georges Terrace 
	
Perth Western Australia 6000 
	
Telephone: 1300 850 505 (within Australia) or 
	
(+61 3) 9415 4000 (outside Australia)     
	
Facsimile: (+61 3) 9473 2500
INVESTOR RELATIONS	
Ms Paula Raffo     
	
Level 11, 197 St Georges Terrace
	
Perth Western Australia 6000 
	
(PO Box 8062 Cloisters Square PO WA 6850)
	
Telephone: (+61 8) 9423 8100 
	
Facsimile: (+61 8) 9381 4978 
	
Email: paladin@paladinenergy.com.au 
AUDITORS	
PricewaterhouseCoopers
	
125 St Georges Terrace
	
Perth Western Australia 6000 
STOCK EXCHANGE LISTINGS	
Australian Securities Exchange 
	
Code: PDN
	
OTCQX
	
Code: PALAF
	
Munich, Berlin, Stuttgart and Frankfurt Stock Exchanges     
	
Code: PUR
	
Namibian Stock Exchange
	
Code: NM-PDN
The annual report covers the Group consisting of Paladin Energy Ltd (referred throughout as the Company or Paladin) and its controlled 
entities (the Group).
Paladin Energy Ltd is a company limited by shares, incorporated and domiciled in Australia.

Level 11, 197 St Georges Terrace
Perth Western Australia 6000
T	 +61 8 9423 8100
F	 +61 8 9381 4978
paladin@paladinenergy.com.au
paladinenergy.com.au
ABN 47 061 681 098
This report is printed utilising 
solar electricity on paper 
that is 100% recycled, carbon 
neutral and FSC® certified.