UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
[X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE
ACT OF 1934
For the fiscal year ended December 31, 2018
[ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES
EXCHANGE ACT OF 1934
For the transition period from _______________ to _______________
000-54416
(Commission File Number)
Scandium International Mining Corp.
(Exact Name of Registrant as specified in its charter)
British Columbia, Canada
(State or other Jurisdiction of Incorporation
or organization)
98-1009717
(I.R.S. Employer
Identification No.)
1430 Greg Street, Suite 501
Sparks, Nevada
(Address of Principal Executive Offices)
89431
(Zip Code)
Registrant’s Telephone Number, including area code: (775) 355-9500
Securities registered pursuant to Section 12(b) of the Act: None
Securities to be registered pursuant to Section 12(g) of the Act:
Common Shares without par value
(Title of class)
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the
Securities Act. Yes [ ] No [X]
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d)
of the Act. Yes [ ] No [X]
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or
15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period
that the registrant was required to file such reports), and (2) has been subject to such filing requirements for
the past 90 days. Yes [X] No [ ]
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate
Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of
Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required
to submit and post such files). Yes [X] No [ ]
Indicate by check mark if disclosure of delinquent filers in response to Item 405 of Regulation S-K is not
contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or
information statements incorporated by reference in Part III of this Form 10-K or any amendment to this
Form 10-K. [X]
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-
accelerated filer or a smaller reporting company. See the definitions of “large accelerated filer,”
“accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act (Check one):
Large Accelerated Filer
Non-Accelerated Filer
Accelerated Filer
Smaller Reporting Company
Emerging Growth Company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended
transition period for complying with any new or revised financial accounting standards provided pursuant
to Section 13(a) of the Exchange Act [ ]
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange
Act). Yes [ ] No [X]
State the aggregate market value of the voting and non-voting common equity held by non-affiliates
computed by reference to the price at which the common equity was sold, or the average bid and asked
price of such common equity, as of the last business day of the registrant’s most recently completed second
fiscal quarter: $19,076,270 as at June 30, 2018.
Indicate the number of shares outstanding of each of the registrant’s classes of common equity, as of the
latest practicable date: 304,781,294 common shares as at February 28, 2019.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the registrant's Proxy Statement for the Annual Meeting of Stockholders are incorporated by
reference into Part III of this Form 10-K, which Proxy Statement is to be filed within 120 days after the end
of the registrant's fiscal year ended December 31, 2018.
2
TABLE OF CONTENTS
Note about Forward-Looking Statements ..................................................................................................... 4
Glossary of Terms ......................................................................................................................................... 4
ITEM 1. BUSINESS .................................................................................................................................... 8
ITEM 1A. RISK FACTORS ...................................................................................................................... 12
ITEM 2. PROPERTIES ............................................................................................................................. 13
ITEM 3. LEGAL PROCEEDINGS ........................................................................................................... 33
ITEM 4. MINE SAFETY DISCLOSURES ............................................................................................... 33
ITEM 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED STOCKHOLDER
MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES .................................................... 33
ITEM 6. SELECTED FINANCIAL DATA .............................................................................................. 35
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND
RESULTS OF OPERATIONS ................................................................................................................... 35
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK ........ 42
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA............................................ 42
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND
FINANCIAL DISCLOSURE ..................................................................................................................... 43
ITEM 9A. CONTROLS AND PROCEDURES ........................................................................................ 43
ITEM 9B. OTHER INFORMATION ........................................................................................................ 44
ITEM 15. EXHIBITS, FINANCIAL STATEMENTS SCHEDULES ...................................................... 44
Note about Forward-Looking Statements
PART I
Certain statements contained in this annual report on Form 10-K and the documents incorporated by
reference herein constitute "forward-looking statements". Forward-looking statements may include, but
are not limited to, statements with respect to the future price of commodities, the estimation of mineral
resources, the realization of mineral resource estimates, the timing and amount of estimated future
production, costs of production, capital expenditures, costs and timing of the development of new deposits,
success of exploration activities, our ability to fund property acquisition costs, our ability to reach targeted
time frames for establishing feasibility, permitting time lines, currency fluctuations, requirements for
additional capital, government regulation of mining operations, environmental risks, unanticipated
reclamation expenses, title disputes or claims, our ability to raise funds necessary for ongoing and planned
expenditures and operations, and regulatory approvals. In certain cases, forward-looking statements can be
identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "scheduled",
"estimates", "intends", "anticipates" or "believes", or variations of such words and phrases or state that
certain actions, events or results "may", "could", "would" or "will be taken", "occur" or "be achieved".
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may
cause our actual results, performance or achievements to be materially different from any future results,
performance or achievements expressed or implied by the forward-looking statements. Such factors may
include, among others, risks related to our joint venture operations; actual results of current exploration
activities or production technologies that we are currently testing; actual results of reclamation activities;
future metal prices; accidents, labour disputes and other risks of the mining industry; delays in obtaining
governmental or regulatory approvals or financing or in the completion of development activities, as well
as those factors discussed in the section entitled "Risk Factors" and elsewhere in this Form 10-K. Although
we have attempted to identify important factors that could cause actual actions, events or results to differ
materially from those described in forward looking statements, there may be other factors that cause actions,
events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-
looking statements will prove to be accurate, as actual results and future events could differ materially from
those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-
looking statements.
Glossary of Terms
“Company”, “SCY”, “we”, “us”, “our” and similar words of similar meaning refer to Scandium
International Mining Corp.
$, A$, C$
mean respectively, United States dollars, Australian dollars and Canadian dollars.
Alteration
Usually referring to chemical reactions in a rock mass resulting from the passage of
hydrothermal fluids.
Assay
An analysis to determine the presence, absence or quantity of one or more
components, elements or minerals.
.
4
Core
The long cylindrical piece of a rock, up to several inches in diameter, brought to the
surface by Diamond drilling.
Diamond drilling A drilling method in which the cutting is done by abrasion using diamonds embedded
in a matrix rather than by percussion. The drill cuts a core of rock, which is recovered
in long cylindrical sections.
Fractures
Breaks in a rock, usually due to intensive folding or faulting.
Grade
The concentration of a valuable mineral within an Ore.
Hydrothermal
Hot fluids, usually water, which may or may not carry metals and other compounds
in solution to the site of mineral deposition or wall rock alteration.
Igneous
A rock formed by the cooling of molten silicate material.
Intrusion
A general term for a body of igneous rock formed below the surface of the earth.
Kg
Km
Kilogram which is equivalent to approximately 2.20 pounds.
Kilometer which is equivalent to approximately 0.62 miles.
Mineralization
A term used to describe the presence of minerals of possible economic value. Also
used to describe the process by which concentration of economic minerals occurs.
Net Smelter
Returns Royalty
NI 43-101
A share of the net revenues generated from the sale of metal produced by a mine.
National Instrument 43-101 – Standards for Disclosure of Mineral Projects, being the
regulation adopted by Canadian securities regulators that governs the public
disclosure of technical and scientific information concerning a mineral property.
Ore
A naturally occurring solid material from which a metal or valuable mineral can be
profitably extracted.
Outcrop
An exposure of rock at the earth’s surface.
ppm
Pyrite
Parts per million.
Iron sulphide mineral. The most common and abundant sulphide mineral and often
found in association with copper and gold.
Qualified Person Means a Qualified Person as defined in National Instrument 43-101, including an
engineer or geoscientist in good standing with their professional association, with at
least five years of relevant experience.
Quartz
The second most common rock forming mineral in the earth’s crust. SiO2.
5
Resource
Means any of a measured, indicated or inferred resource as used in NI 43-101, and
having the following meanings:
“measured resource” is that part of a Mineral Resource for which quantity, grade or
quality, densities, shape, and physical characteristics are so well established that they
can be estimated with confidence sufficient to allow the appropriate application of
technical and economic parameters, to support production planning and evaluation of
the economic viability of the deposit. The estimate is based on detailed and reliable
exploration, sampling and testing information gathered through appropriate
techniques from locations such as outcrops, trenches, pits, workings and drill holes
that are spaced closely enough to confirm both geological and grade continuity.
“indicated resource” is that part of a Mineral Resource for which quantity, grade or
quality, densities, shape and physical characteristics, can be estimated with a level of
confidence sufficient to allow the appropriate application of technical and economic
parameters, to support mine planning and evaluation of the economic viability of the
deposit. The estimate is based on detailed and reliable exploration and testing
information gathered through appropriate techniques from locations such as outcrops,
trenches, pits, workings and drill holes that are spaced closely enough for geological
and grade continuity to be reasonably assumed.
“inferred resource” is that part of a Mineral Resource for which quantity and grade
or quality can be estimated on the basis of geological evidence and limited sampling
and reasonably assumed, but not verified, geological and grade continuity. The
estimate is based on limited information and sampling gathered through appropriate
techniques from locations such as outcrops, trenches, pits, workings and drill holes.
For the purposes of the above a “mineral resource” means a concentration or
occurrence of diamonds, natural solid inorganic material, or natural solid fossilized
organic material including base and precious metals, coal, and industrial minerals in
or on the Earth’s crust in such form and quantity and of such a grade or quality that
it has reasonable prospects for economic extraction. The location, quantity, grade,
geological characteristics and continuity of a Mineral Resource are known, estimated
or interpreted from specific geological evidence and knowledge.
(Please refer to “Item 2. Properties - Cautionary Note to U.S. Investors Regarding
Resource Estimates” in regards to the use of the above terms in this Form 10-K.)
Sulphide
A class of minerals characterized by the linkage of sulphur with a metal (such as Pyrite
(FeS2)).
Tpd/Tpa
Tonnes per day/tonnes per annum.
Tonne
A metric ton which is equivalent to approximately 2,204 pounds.
Sediments
The debris resulting from the weathering and breakup of rocks that have been
deposited by or carried by runoff, streams and rivers, or left over from glacial erosion
or sometimes from wind action.
6
Vein
A geological feature comprised of minerals (usually dominated by quartz) that are
found filling openings in rocks created by faults or replacing rocks on either side of
faults or fractures.
7
ITEM 1. BUSINESS
General
We were incorporated on July 17, 2006 under the laws of British Columbia, Canada under the name Golden
Predator Mines Inc. We were incorporated as a wholly owned subsidiary of Energy Metals Corp. for the
purpose of holding precious metals and certain specialty metals assets. In order to focus on specialty metals,
during February 2009 we transferred most of our precious mineral assets to our then wholly-owned
subsidiary Golden Predator Corp., and on March 6, 2009 we completed a spin-out of Golden Predator Corp.
to our shareholders. Effective March 12, 2009, we changed our name to EMC Metals Corp. In order to
reflect a new emphasis on mining for scandium minerals, effective November 19, 2014, we changed our
name to Scandium International Mining Corp (“SCY” or ‘the Company’).
We are a reporting issuer in the Canadian Provinces of British Columbia, Alberta and Ontario and our
common shares are listed for trading on the Toronto Stock Exchange under the trading symbol “SCY”.
Our head office is located at 1430 Greg Street, Suite 501, Sparks, Nevada 89431. The address of our
registered office is 1200 - 750 West Pender Street, Vancouver, British Columbia, Canada, V6C 2T8.
Our focus of operations is the development of the Nyngan scandium project located in New South Wales,
Australia (the “Nyngan Scandium Project”). We also hold a scandium mineral property located nearby
Nyngan known as the “Honeybugle Scandium property” and a reservation on an exploration license in
Finland, known as the “Kiviniemi Scandium property”.
Our plan of operation for the remainder of 2019 is to obtain offtake sales agreements with counterparties
for Nyngan Scandium Project product and seek additional funding for project construction and corporate
working capital. We plan to conduct exploration activities at the Kiviniemi Scandium property and also
continue to test and develop unique scandium recovery and finishing techniques, including the processing
of intermediate scandium aluminum products.
Intercorporate Relationships
The chart below illustrates our corporate structure on December 31, 2018, including our subsidiaries, the
jurisdictions of incorporation, and the percentage of voting securities held.
8
Recent History
Nyngan Feasibility Study
On April 18, 2016, the Company announced the results of an independently prepared feasibility study on
the Nyngan Scandium Project. The technical report on the feasibility study entitled “Feasibility Study –
Nyngan Scandium Project, Bogan Shire, NSW, Australia” is dated May 4, 2016 and was independently
compiled pursuant to the requirements of NI 43-101. The report was filed on May 6, 2016 and is available
on SEDAR (www.sedar.com) and on the Company’s website (www.scandiummining.com) and the SEC’s
website (www.sec.gov). A summary of the report is provided herein under “Item 2. Properties –
Description of Mineral Projects – Nyngan Scandium Project – Nyngan Feasibility Study”.
Transactions with Scandium Investments LLC
On June 24, 2014, SCY entered into a $2.5 million loan facility with Scandium Investments LLC (“SIL”),
a company owned by a US private investor group (the “2014 Loan”). In accordance with the terms of the
2014 Loan, the outstanding principal and interest were converted in 2015 into a 20% ownership interest in
EMC Metals Australia Pty Ltd (“EMC Australia”), with SCY holding an 80% ownership interest. EMC
Australia holds our interests in the Nyngan Scandium Project and Honeybugle Scandium property. As a
result, from Q3 2015 until October 2017, EMC Australia was operated as a joint venture between SIL and
SCY with SIL holding a carried interest in the Nyngan Scandium Project until the Company met certain
development milestones. The Company completed the development milestones during May 2017 and
triggered a limited period option whereby SIL had a right to convert the fair market value of its 20% interest
in EMC Australia into an equivalent value of SCY common shares, at then prevailing market prices.
In June of 2017, the Company entered into a share exchange agreement with SIL for the purchase of SIL’s
20% interest in EMC Australia in exchange for 57,371,565 common shares of SCY as well as an additional
1,459,080 common shares as a royalty adjustment payment. Closing of the purchase of the EMC Australia
shares was subject to shareholder approval, which the Company obtained at a special meeting of
shareholders held on September 11, 2017. The transaction subsequently closed on October 9, 2017. Under
the terms of the share purchase agreement, SIL was granted the right to nominate two individuals to the
board of the Company for so long as SIL held at least 15% of SCY’s issued and outstanding shares, and
one director for so long as they held at least 5% but less than 15% of SCY’s issued and outstanding shares.
Pursuant to the nomination rights, Peter Evensen and R. Christian Evensen were appointed as directors to
the SCY Board on closing of the transaction.
Business Operations
Company Summary
We are a mineral exploration and development company that is primarily focused on the development of
scandium mineral resources, and scandium end-use markets, through identification of value-added
applications for scandium in aluminum alloys and end products. The Company has also considered
exploration and development interest in rare earth minerals, and other specialty metals, including nickel,
cobalt, boron, manganese, tantalum, titanium and zirconium. We have not commenced development of any
of our scandium projects, and as a result we are an exploration stage company.
We have established a 16.9 million tonne measured and indicated resource on the Nyngan property (grading
235ppm at a 100ppm cut-off) and we have also established a 1.43 million tonne mineral reserve (combined
proven and probable) on the Nyngan Scandium Project, based on economics presented in our 2016
feasibility study.
9
Our principal project is the Nyngan Scandium Project located in New South Wales, Australia, over which
we own 100% of the mineral rights, including exploration licenses and a mining lease grant on the portion
of the property that corresponds to the feasibility study development. In April 2014, we also acquired an
exploration license referred to as the Honeybugle Scandium property, a prospective scandium exploration
property located 24 kilometers from the Nyngan Scandium Project. During August 2018, we were granted
an exploration license for the Kiviniemi Scandium property in central Finland from the Finnish regulatory
body governing mineral exploration and mining in Finland.
Corporate Objectives and Strategy
Our corporate focus is to produce and sell scandium (Sc) and scandium-based products. None of our current
properties has advanced to the development or production stage and we are currently an exploration stage
company. We have completed an independently prepared definitive feasibility study (“DFS”) of the
Nyngan Scandium Project. Subject to successfully financing of construction costs, we intend to develop
the Nyngan Scandium Project for production, with a view to supplying anticipated future demand for
scandium oxide and scandium-content materials. For further information on the Nyngan Scandium Project,
please refer to “Item 2. Properties - Description of Mineral Projects – Nyngan Scandium Project” and
“Item 1A. Risk Factors”.
Concurrently with our analysis of the Nyngan Scandium Project, we are developing and testing unique
mineral recovery techniques as well as techniques to produce high quality intermediate scandium-content
aluminum alloy products. If effective at a commercial level, these mineral recovery techniques, scandia
finishing techniques and intermediate product developments are expected to provide increased economic
margins and returns on capital on any future scandium production.
Presently our recovery and finishing technology is completed to a degree that supports engineering and
flow sheet design for our +15%/-5% DFS, although further development work will continue in both areas.
There is no guarantee that we will be able to benefit from the commercial application of such techniques or
that we will have scandium production in the future.
Global Scandium Production and Market
Scandium is the 31st most abundant element in the earth’s crust (average 33 ppm), which makes it more
common than lead, mercury and precious metals, but less common than copper. Scandium has
characteristics that are similar to rare earth elements, and it is often classified as a member of that group,
although it is technically a light transition metal. Scandium occurs in nature as an oxide, rarely occurs in
concentrated quantities because it does not selectively combine with the common ore-forming anions, and
is very difficult to reduce to a pure metal state. Scandium is typically produced and sold as scandium oxide
(Sc2O3), more properly known as scandia.
Global annual production estimates of scandium range from 10 tonnes to 15 tonnes, but accurate statistics
are not available due to the lack of public information from countries in which scandium is currently being
produced. There are five known, primary production sources globally today: stockpiles from the former
Zhovti Voty uranium mine in Ukraine, the rare earth mine at Bayan Obo in China, apatite mines on the
Kola Peninsula in Russia, by-product production from titanium dioxide (TiO2) pigment refiners in China,
and recent start-up production of scandium oxide concentrates from the Taganito Nickel Mine in the
Philippines (Sumitomo Metal Mining Co., Ltd.)
There is no reliable pricing data on global scandium oxide trading. The U.S. Geological Survey (“USGS”)
in its latest report (February 2018) documents the 2017 price of scandium oxide (99.99% grade) at
10
US$4,600/kg, indicating no change from the 2016 price estimate. Small quantities of scandium oxide are
currently offered on the internet by traders for prices at this level, although product of slightly lower grade
is commonly available at considerably lower prices. Scandium oxide grades of 95% or greater are
considered commercially suitable, with 99.9% grade used for electrical applications, and grades higher than
99.9% reserved for science and new technical applications. Scandium oxide grades of 95-99% are generally
considered suitable for aluminum alloy applications.
Scandium oxide is typically traded in small quantities, between private parties, and pricing is not transparent
to other buyers or sellers as there is no clearing facility as is more common with commercially traded metals
and commodities. Prices do vary, based on purity and quantity supplied. Small sale quantities tend to
command premium prices, and large quantities (over one tonne) are simply not available to establish
appropriate commercial pricing.
Scandium can also be effectively purchased in the form of aluminum-scandium (Al-Sc) master alloy,
typically containing 2% scandium by weight. This product is tailored for use in aluminum alloy production
containing scandium. The 2017 USGS report indicates the 2017 price for Al-Sc 2% master alloy at
US$350/kg. This 2017 price estimate represents a slightly higher estimate than the 2015 USGS average.
USGS estimated prices for Al-Sc 2% master alloy over the last five years show significant year-by-year
volatility, ranging from a low of US$ 220/kg (2012) to a high of US$386/kg (2014).
Principal uses for scandium are in high-strength aluminum alloys, high-intensity metal halide lamps,
electronics, and laser research. Recently developed applications include welding wire and fuel cells which
are expected to be in future demand. Approximately 15 different commercial aluminum-scandium alloys
have been developed, and some of them are used for aerospace applications. In Europe and the U.S.,
scandium-containing alloys have been evaluated for use in structural parts in commercial airplanes and high
stress parts in automobile engines and brake systems. Military and aerospace applications are known to be
of interest, although with less specificity. The combination of high strength, weldability and ductility makes
aluminum-scandium alloys potentially attractive replacements for existing aluminum alloys in a number of
applications where improved alloy properties can add value to final products.
Competitive Conditions
We compete with numerous other companies and individuals in the search for and the acquisition or control
of attractive rare earth and specialty metals mineral properties. Our ability to acquire further properties will
depend not only on our ability to operate and develop our properties but also on our ability to select and
acquire suitable properties or prospects for development or mineral exploration.
In regard to our plan to produce scandium, there are a limited number of scandium producers presently. If
we are successful at becoming a producer of scandium, our ability to be competitive will require that we
establish a reliable supply of scandium to the market, delivered at purity levels demanded by various
applications, and that our operating costs generate margins at prices that will be set by customers and
competitors in a market yet to mature.
Governmental Regulations and Environmental Laws
The development of any of our properties, and specifically the Nyngan Scandium Project, will require
numerous local and national government approvals and environmental permits. For further information
about governmental approvals and permitting requirements, please refer to “Item 1A. Risk Factors”.
Employees
11
As at January 1, 2019, we have 5 full and part time employees and 5 individuals working on a consulting
basis. Our operations are managed by our officers with input from our directors. We engage geological,
metallurgical, and engineering consultants from time to time as required to assist in evaluating our property
interests and recommending and conducting work programs.
ITEM 1A. RISK FACTORS
In addition to the factors discussed elsewhere in this Form 10-K, the following are certain material risks
and uncertainties that are specific to our industry and properties that could materially adversely affect our
business, financial condition and results of operations.
Risks Associated with the Nyngan Scandium Project
There are technical challenges to scandium production that may render the Nyngan Scandium Project
not economic. The economics of scandium recovery are known to be challenging. There are very few
facilities producing scandium and the existing scandium producers are secretive in their techniques for
recovery. In addition, the recovery of scandium product from laterite resources, such as are found on the
Nyngan property, has not been demonstrated at an operating facility. The Nyngan processing facility
design, if constructed, will be the first of its kind for scandium production. These factors increase the
possibility that we will encounter unknown or unanticipated production and processing risks. Should we
encounter any of these risks, they could increase the cost of production thereby reducing margins on the
Nyngan Scandium Project or rendering it uneconomic.
There is no guarantee that we will be able to finance the Nyngan Scandium Project for production. Any
decision to proceed with production on the Nyngan Scandium Project will require significant production
financing. Scandium projects are uncommon, and economic and production uncertainty may limit our
ability to attract the required amount of capital to put the project into production. If we are unable to source
production financing on commercially viable terms, we may not be able to proceed with the project and
may have to write off our investment in the project.
If we are successful at achieving production, we may have difficulty selling scandium. Scandium is
characterized by unreliable supply, resulting in limited development of markets for scandium oxide.
Markets may take longer to develop than anticipated, and Nyngan and other potential scandium producers
may have to wait for products and applications to create adequate demand. Certain applications may require
lengthy certification processes that could delay usage or acceptance. In addition, certain scandium
applications require very high purity scandium product, which is much more difficult to produce than lower
grade product. If we commence production, our inability to supply scandium in sufficient quantities, in a
reliable and timely manner, and in the correct quality, could reduce the demand for any scandium produced
from our projects and possibly render the project uneconomic.
General Risks Associated with our Mining Activities and Company
We may not receive permits necessary to proceed with the development of a mining project. The
development of any of our properties, including the Nyngan Scandium Project, will require the acquisition
and sustained possession of numerous local and national government approvals and permits. Our ability to
secure all necessary permits required to develop any of our projects is unknown until such permits are
received. If we cannot obtain or retain all necessary permits, the Nyngan Scandium Project cannot be
developed, and our investment in the project will potentially be lost. While the critical permits for the
Nyngan Scandium Project have been received, other permits remain outstanding at this time and continuing
compliance with the terms of the permits is required. Our future market value will likely be significantly
12
reduced to the extent one or more of our projects cannot proceed to the development or production stage
due to an inability to secure all required permits.
Mineral Resource Estimates on our properties are subject to uncertainty and may not reflect what may
be economically extracted. Resource estimates included for scandium on our Nyngan property are
estimates only and no assurances can be given that the estimated levels of scandium minerals will actually
be produced or that we will receive the metal prices assumed in determining our resources. Such estimates
are expressions of judgment based on knowledge, mining experience, analysis of drilling and exploration
results and industry practices. Estimates made at any given time may change significantly when new
information becomes available or when parameters that were used for such estimates change. By their
nature resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which
may ultimately prove unreliable. Furthermore, market price fluctuations in scandium, as well as increased
capital or production costs or reduced recovery rates, may limit our ability to establish reserves at some
future point on Nyngan, or on any of our properties. The extent to which more Nyngan project resources
may ultimately be reclassified as proven or probable reserves is dependent upon the demonstration of their
profitable recovery. The evaluation of reserves or resources is always influenced by economic and
technological factors, which may change over time. Accordingly, further current resource estimates on our
material properties may never be converted into reserves, or be economically extracted, and we may have
to write off such properties or incur a loss on sale of our interest on such properties, which will likely reduce
the value of our shares.
Our potential for a competitive advantage in specialty and rare metals production depends on the
availability of our technical processing abilities, as currently provided by our Chief Technology Officer.
We are dependent upon the personal efforts and commitment of Willem Duyvesteyn, our CTO, a director
and significant shareholder of the Company, for the continued development of new extractive technologies
related to scandium and other rare and specialty metals production. The loss of the services of Mr.
Duyvesteyn will likely limit our ability to use or continue the development of such technologies, which
would remove the potential competitive and economic benefit of such technologies.
Our operations are subject to losses due to exchange rate fluctuation. We maintain accounts in Canadian,
Australian, Euro and U.S. currency. Our equity financings have to date been priced in Canadian dollars.
All of our material projects and non-cash assets are located outside of both Canada and the USA, however,
and require regular currency conversions to local currencies where such projects and assets are located. Our
operations are accordingly subject to foreign currency fluctuations and such fluctuations may materially
affect our financial position and results. We do not engage in currency hedging activities.
We do not currently earn any revenue and without additional funding, we will not be able to carry out
our business plan, and if we raise additional funding existing security holders may experience dilution.
As an exploration stage mining company, none of our principal properties are in operation and we do not
currently earn any revenue. In order to continue our exploration activities and to meet our obligations on
the Nyngan Scandium Project, we will need to raise additional funds. Recently, we have relied entirely on
the sale of our securities to raise funds for operations. Our ability to continue to raise funds from the sale
of our securities is subject to significant uncertainty due to volatility in the mineral exploration marketplace.
If we are able to raise funds from the sale of our securities, existing security holders may experience
significant dilution of their ownership interests and possibly to the value of their existing securities.
ITEM 2. PROPERTIES
Cautionary Note to U.S. Investors Regarding Resource Estimates
13
Certain terms used in this section are those used in accordance with the requirements of the securities laws
in effect in Canada, which differ from the requirements of U.S. securities laws. Canadian requirements,
including NI 43-101, differ significantly from the requirements of the U.S. Securities and Exchange
Commission (the “SEC”), and resource information contained herein may not be comparable to similar
information disclosed by U.S. companies.
In particular, and without limiting the generality of the foregoing, the term “resource” does not equate to
the term “reserves”. The requirements of NI 43-101 for identification of “reserves” are not the same as
those of the SEC, and reserves reported in compliance with NI 43-101 may not qualify as “reserves” under
SEC standards. Under U.S. standards, mineralization may not be classified as a “reserve” unless the
determination has been made that the mineralization could be economically and legally produced or
extracted at the time the reserve determination is made.
The SEC’s disclosure standards normally do not recognize information concerning “measured mineral
resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the
amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards, in
documents filed with the SEC. In addition, resources that are classified as “inferred mineral resources”
have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal
feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded
to a higher category. Under Canadian rules, estimated “inferred mineral resources” may not generally form
the basis of feasibility or pre-feasibility studies. Investors are cautioned not to assume that all or any part
of an “inferred mineral resource” exists or is economically or legally mineable.
Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations,
however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves”
by SEC standards as in-place tonnage and grade without reference to unit measures.
Accordingly, information concerning mineral deposits set forth herein may not be comparable with
information presented by companies using only U.S. standards in their public disclosure.
Description of Mineral Projects
Nyngan Scandium Project
Property Description and Location
The Nyngan Scandium Project site is located approximately 450 kilometres northwest of Sydney, NSW,
Australia and approximately 20 kilometres due west from the town of Nyngan, a rural town of
approximately 2,900 people. The deposit is located 5 kilometres south of Miandetta, off the Barrier
Highway that connects the town of Nyngan to the town of Cobar. The license area can be reached via
the paved Barrier Highway, which allows year-round access, but final access to the site itself is reached
by clay farm tracks. The general area can be characterized as flat countryside and is classified as
agricultural land, used predominantly for wheat farming and livestock grazing. Infrastructure in the area is
good, with available water and electric power in close proximity to the property boundaries.
The Nyngan property is classified as an Australia Property for purposes of financial statement segment
information.
The scandium resource is hosted within the lateritic zone of the Gilgai Intrusion, one of several Alaskan-
type mafic and ultramafic bodies which intrude Cambrian-Ordovician metasediments collectively called
the Girilambone Group. The laterite zone, locally up to 40 meters thick, is layered with hematitic clay at
14
the surface followed by limonitic clay, saprolitic clay, weathered bedrock and finally fresh bedrock. The
scandium mineralization is concentrated within the hematitic, limonitic, and saprolitic zones with values
up to 350 ppm scandium.
The general location of the Nyngan Scandium Project is provided in Figure 1 below. The specific location
of the exploration licenses that we may earn an interest in are provided in Figure 2 below.
Figure 1: Location of Nyngan Scandium Project
15
Figure 2: Location of the Exploration Licenses and Mining Lease for the Nyngan Scandium
Project
Mineral License Details
The scandium resource is held under Exploration License (EL) 8316 (Block Number 3132, units d, e, j, k
and Block no. 3133, unit f) and EL 6096 (Block 3132, unit p, and Block 3133, units l, m, r and s); a total of
ten (10) graticular units. The exploration licenses allow the license holder to conduct exploration on private
land (with landowner consents and signed compensation agreements in place) and public lands not
including wildlife reserves, heritage areas or National Parks. The scandium resource is fully enclosed on
private agricultural land.
The Company’s Australian subsidiary holds legal title to both the surface and mineral exploration rights on
the Nyngan Scandium Project.
Following the award of Mining Lease 1763 (ML 1763) an additional EL (EL 8448) was granted so as to
provide better security at the project. Figure 2 provides details of the location of EL 8448 and the location
of Mining Lease 1763, which overlays the exploration license area.
The exploration licenses cover 29.25 square kilometers (2,925 hectares). The resource site is located at
geographic coordinates MGA zone 55, GDA 94, Lat: - 31.5987, Long: 146.9827, Map Sheets 1:250k –
Cobar (SH/55-14) and 1:100k Hermidale (8234).
16
The project surface rights (freehold) total 810 acres (370 hectares) on a portion of the exploration license
area. The freehold property boundaries are defined by standard land survey techniques undertaken by the
Lands Department and currently presented in the form of Cadastral Deposited Plans (DP) and Lots. The
land associated with the project rights is DP 752879, Lots 6 and 7 (Appendix 2, Lots 6 and 7 - Nyngan).
The Company is required to lodge individual A$10,000 environmental bonds with the NSW Mines
Department for each license, and must meet total minimum work requirements annually of approximately
A$65,000, covering both licenses.
Royalties attached to the properties include a 1.5% Net Profits Interest royalty to private parties involved
with the early exploration on the property, a 1.7% Net Smelter Returns Royalty payable to Jervois for 12
years after production commences, subject to terms in the settlement agreement, and a 0.7% royalty on
gross mineral sales to a private investor. Another revenue royalty is payable to private interests of 0.2%,
subject to a US$370k cap. A NSW minerals royalty will also be levied on the project, subject to negotiation,
currently 4% on revenue.
Metallurgy Development
The Company has invested in and developed methodology for extracting scandium from the Nyngan
property resource since 2010. A portion of the work done over this period has been superseded by work
that followed, but subsequent test programs universally benefitted from prior efforts. In summary, the
programs have been as follows:
• 2010 – The Company inherited work done on Nyngan from the previous property owner, and
applied that work to a quick flowsheet and capital estimate done for management by Roberts &
Schaefer of Salt Lake City, Utah;
• 2011 – The Company employed Hazen Research, Inc., of Golden, Colorado, USA (“Hazen”) to
test acid baking techniques and solvent extraction (“SX”) processes with Nyngan resource material.
The Company also employed SGS-Lakefield (Ontario) to test pressure acid leach techniques on
Nyngan resource, as a replacement for or an enhancement to acid bake techniques done earlier in
the year by Hazen;
• 2012 – The Company engaged SNC-Lavalin to do an economic study for management, utilizing an
acid bake flowsheet and SX work from the Hazen test program;
• 2014 – The Company published a preliminary economic assessment (“PEA”) entitled NI 43-101F1
Technical Report on the Feasibility of the Nyngan Scandium Project, authored by Larpro Pty Ltd,
utilizing both Hazen and SGS-Lakefield test work results; and
• 2015 – The Company amended and refiled the 2014 PEA Report as the “Amended Technical Report
and Preliminary Economic Analysis on the Nyngan Scandium Project, NSW, Australia”.
• 2016 – The Company published an independently prepared definitive feasibility study on the
Nyngan Scandium Project. The technical report on the feasibility study entitled “Feasibility Study
– Nyngan Scandium Project, Bogan Shire, NSW, Australia” was independently compiled pursuant
to the requirements of NI 43-101 and incorporated the results of current and previous test work.
Nyngan Feasibility Study
On April 18, 2016, the Company announced the results of an independent definitive feasibility study on the
Nyngan Scandium Project. The technical report on the feasibility study entitled “Feasibility Study –
Nyngan Scandium Project, Bogan Shire, NSW, Australia” is dated May 4, 2016 and was independently
compiled pursuant to the requirements of NI 43-101 (the “Feasibility Study” or “DFS”). The report was
filed on May 6, 2016 and is available on SEDAR (www.sedar.com) and on the Company’s website
17
(www.scandiummining.com) and the SEC’s website (www.sec.gov). A full discussion on the technical
report was provided in the Company’s Form 10Q for the quarterly period ending March 31, 2016, as filed
with the SEC and on SEDAR on May 13, 2016.
The Feasibility Study concluded that the Nyngan Scandium Project has the potential to produce an average
of 37,690 kilograms of scandium oxide (scandia) per year, at grades of 98.0%-99.8%, generating an after-
tax cumulative cash flow over a 20 year project life of US$629 million, with an NPV10% of US$177 million.
The average process plant feed grade over the 20 year project life is 409ppm of scandium.
The Feasibility Study has been developed and compiled to an accuracy level of +15%/-5%, by a globally
recognized engineering firm that has considerable expertise in laterite deposits and process facilities, as
well as in smaller mining and processing projects, and has excellent familiarity with the Nyngan Scandium
Project location and environment.
Nyngan Scandium Project Highlights
• Capital cost estimate for the project is US$87.1 million,
• Annual scandium oxide product volume averages 37,690 kg, over 20 years,
• Annual revenue of US$75.4 million (oxide price assumption of US$2,000/kg),
• Operating cost estimate for the project is US$557/kg scandium oxide,
• Project Constant Dollar NPV10% is US$177 million, (NPV8% is US$225 million),
• Project Constant Dollar IRR is 33.1%,
• Oxide product grades of 98-99.8%, as based on customer requirements,
• Project resource increases by 40% to 16.9 million tonnes, grading 235ppm Sc, at a 100ppm cut-off
in the measured and indicated categories, and
• Project Reserve totalling 1.43 million tonnes, grading 409ppm Sc was established on part of the
resource.
DFS Conclusions and Recommendations
The production assumptions in the Feasibility Study are backed by solid independent flow sheet test work
on the planned process for scandium recovery. The Feasibility Study consolidates a significant amount of
metallurgical test work and prior study on the Nyngan Scandium Project, including important test work
results completed since the PEA was generated in 2014. The entire body of work demonstrates a viable,
conventional process flow sheet utilizing a continuous-system HPAL leaching process, and good
metallurgical recoveries of scandium from the resource. The metallurgical assumptions are supported by
various bench and pilot scale independent test work programs that are consistent with known outcomes in
other laterite resources. A number of the key elements of this flowsheet work have been protected by the
Company under US Patent Applications. The continuous autoclave configuration, as opposed to batch
systems explored in previous flow sheets, is also a more conventional and current design choice.
The level of accuracy established in the Feasibility Study substantially reduces the uncertainty levels
inherent in earlier studies, specifically the PEA. The greater confidence intervals around the Feasibility
Study were achieved by reliance on significant project engineering work, a capital and operating cost
estimate supported by detailed requirements and vendor pricing, plus one offtake agreement and an
independent marketing assessment, both supportive of the marketing assumptions on the business.
The Feasibility Study delivered a positive result on the Nyngan Scandium Project, and recommends the
Nyngan Scandium Project owners seek finance and proceed to construction. Recommendations were made
therein for additional immediate work, notably to win additional offtake agreements with customers,
18
complete some optimizing flow sheet studies, and to initiate as early as possible detailed engineering
required on certain long-lead capital items.
Confirmatory Metallurgical Test Results
On June 29, 2016 we announced the results of a confirmatory metallurgical test work report from Altrius
Engineering Services (AES) of Brisbane, Australia. The test work results directly relate to the list of
recommended programs included in the Feasibility Study. AES devised and supervised these test work
programs at the SGS laboratory in Perth, Australia and at the Nagrom laboratory in Brisbane, Australia.
The project DFS recommended a number of process flowsheet test work programs be investigated prior to
commencing detailed engineering and construction. Those study areas included pressure leach (“HPAL”),
counter-current decant circuits (“CCD”), solvent extraction (“SX”), and oxalate precipitation, with specific
work steps suggested in each area. This latest test work program addresses all of these recommended areas,
and the results confirm recoveries and efficiencies that either meet or exceed the parameters used in the
DFS. Highlights of the testing are:
• Pressure leach test work achieved 88% recoveries, from larger volume tests,
• Settling characteristics of leach discharge slurry show substantial improvement,
• Residue neutralization work meets or exceeds all environmental requirements as presented in the
DFS and the environmental impact statement,
• Solvent extraction circuit optimization tests generated improved performance, exceeding 99%
recovery in single pass systems, and
• Product finish circuits produced 99.8% scandium oxide, completing the recovery process from
Nyngan ore to finished scandia product.
Engineering, Procurement and Construction Management Contract
On May 30, 2017, the Company announced that its subsidiary EMC Australia signed an Engineering,
Procurement and Construction Management ("EPCM") contract with Lycopodium Minerals Pty Ltd
("Lycopodium"), to build the Nyngan Scandium Project in New South Wales, Australia. The EPCM
contract also provides for start-up and commissioning services.
The EPCM contract ("the EPCM Contract") appoints Lycopodium (Brisbane, QLD, Australia) to manage
all aspects of project construction. Lycopodium is the principal engineering firm involved with the DFS.
Lycopodium's continued involvement in project construction and commissioning ensures valuable technical
and management continuity for the project during the construction and start-up of the project.
The EPCM Contract consists of two phases: Phase I is pre-notice to proceed (“NTP”), and Phase II is full-
NTP. Phase I is a cost-reimbursable period that allows SCY full access to Lycopodium's services and the
EPCM team for specific tasks and advance work on long-lead items. Phase II will be initiated with a formal
NTP, fully at SCY's discretion, with project funding in place, and will activate the Contract and services as
agreed in the scope of work.
Post-NTP, the EPCM Contract is cost-reimbursable for labor and other costs, and specifies fixed price
components for labor rates, corporate overhead and profit margins ("Fee"), and firm scope (hours) for all
EPCM services. A portion (50%) of the Fee is adjustable, based on measured performance on four specified
parameters: overall project capital cost performance, schedule performance, safety performance and the
overall assessment of Lycopodium's performance by Scandium International. There is also a provision in
19
the EPCM Contract to establish a Fee incentive for Lycopodium based on the ramp-up of the project's
production levels, post completion.
Lycopodium has been awarded the majority of the services in this EPCM Contract scope, including project
management, engineering design and management, procurement services, contracting services,
construction management and commissioning. SCY has specified that Knight Piesold Consulting
(Brisbane, QLD, Australia) will perform water, earthworks, and tailings systems engineering and design.
Knight Piesold were the engineers on these components of the DFS as well.
On October 19, 2017, we announced that Lycopodium has been instructed to initiate critical path
engineering for the Nyngan Scandium Project. Lycopodium commenced work on select critical path
components for the project, including design and specification engineering on the high-pressure autoclave
unit, associated flash and splash vessels and several specialized high-pressure input pumps. The engineering
work was completed during 2018 and will enable final supplier selection, firm component pricing and
delivery dates for these key process components.
Environmental Permitting/Development Consent/Mining Lease
On May 2, 2016, the Company announced the filing of an Environmental Impact Statement (“EIS”) with
the New South Wales, Australia, Department of Planning and Environment, (the “Department”) in support
of the planned development of the Nyngan Scandium Project. The EIS was prepared by R.W. Corkery &
Co. Pty. Limited, on behalf of the Company’s 80% owned subsidiary, EMC Australia, to support an
application for Development Consent for the Nyngan Scandium Project. The EIS is a complete document,
including a Specialist Consultants Study Compendium, and was submitted to the Department on Friday,
April 29, 2016.
EIS Highlights:
• The EIS finds residual environmental impacts represent negligible risk.
• The proposed development design achieves sustainable environmental outcomes.
• The EIS finds net-positive social and economic outcomes for the community.
• Nine independent environmental consulting groups conducted analysis over five years, and
contributed report findings to the EIS.
• The Nyngan project development is estimated to contribute A$12.4M to the local and regional
economies, and A$39M to the State and Federal economies, annually
• The EIS is fully aligned with the DFS and with a NSW Mining License Application for the Nyngan
project.
Conclusion statement in the EIS:
“In light of the conclusions included throughout this Environmental Impact Statement, it is assessed that
the Proposal could be constructed and operated in a manner that would satisfy all relevant statutory goals
and criteria, environmental objectives and reasonable community expectations.”
EIS Discussion:
The EIS is the foundation document submitted by a developer intending to build a mine facility in Australia.
The Nyngan Scandium Project is considered a State Significant Project, in that capital cost exceeds
A$30million, which means State agencies are designated to manage the investigation and approval process
20
for granting a Development Consent, from the Minister of Planning and Environment. This Department
will manage the review of the Proposal through a number of State and local governmental agencies.
The EIS is a self-contained set of documents used to seek a Development Consent. It is however, supported
in many ways by the recently completed DFS.
On November 10, 2016, the Company announced that the Development Consent had been granted. This
Development Consent represents an approval to develop the Nyngan Scandium Project and is based on the
EIS. The Development Consent follows an in-depth review of the EIS, the project plan, community impact
studies, public EIS exhibition and commentary, and economic viability, and involved more than 12
specialized governmental agencies and groups.
During May 2017, EMC Australia received notice of approval for its Mining Lease application. The Mining
Lease (“ML”) overlays select areas previously covered by two Exploration Licenses. The ML represents
the final major development approval required from the NSW Government to begin construction on the
project. The final signed ML Grant was received in October 2017, issued for a period of 21 years, and based
on the development plans and intent submitted in the ML Application. The ML can be modified by NSW
regulatory agencies, as requested by EMC Australia over time, to reflect changing operating conditions.
In addition to these two key governmental approvals, other required licenses and permits must be acquired
but are considered routine and require only compliance with fixed standards and objective measurements.
These remaining approvals include submittal of numerous plans and reports supporting compliance with
Development Consent and Mining Lease. In addition, the following water, roads, dam and electrical access
reviews and arrangements must be finalized:
• Water Supply Works and Use Approval and Water Access License,
• State and local approval for construction of the intersection of the Site Access Road and Gilgai
Road,
• An approval from the NSW Dams Safety Committee for the design and construction of the Residue
Storage Facility, and
• A high voltage connection agreement with Essential Energy.
On January 2, 2019, the Company announced receipt of notification that the New South Wales Department
of Planning and Environment is reviewing the granting of Mine Lease 1763 related to the Nyngan Scandium
Project. The Company does not expect the outcome of this review to affect its ability to bring the Nyngan
Scandium Project into production.
This current formal Department review is in response to an objection by a landowner who holds freehold
surface ownership over a portion of the total 874 hectare mine lease area. The landowner objection claims
the property is “Agricultural Land”, with meaning as defined in the relevant law.
The landowner filed a formal objection with the Department in mid-2016. That formal objection notice
was improperly handled, and was only physically located and verified as compliant in mid-2018. The
landowner made the Department aware of the existence of an unrecorded objection in mid-2017, and the
Company was subsequently advised that the objection was investigated by the Department directly with the
landowner prior to final award of the signed ML grant in late 2017.
The NSW Department of Planning and Environment has recently sought and received independent
consultant input that the landowner objection should qualify as “Agricultural Land”, as defined in the
relevant law. The Company has rights of comment on that finding, which have been exercised, in a formal
comment package delivered to the Department on February 1, 2019. With receipt and consideration of
21
comment documents from the parties, and further Department input, the Department Secretary will make a
new determination on the validity of the affected portion of the ML.
If the Department Secretary’s decision upholds the landowner objection, the Company believes that
outcome will not delay or prevent the development of the Nyngan Scandium Project., as is generally
characterized in the 2016 feasibility study.
Patent Application Filings
On February 17, 2015, the Company announced the filing of patent applications with the US Patent Office
related to novel flowsheet designs for the recovery of scandium from laterite resource material. These
filings have been supplemented by additional patent applications and the Company has now filed a total of
eight additional applications in this area. All of these patents are directly applicable to our Nyngan
Scandium Project, and future project expansions.
To date three patent applications have been granted:
(i)
May 2018 - USP 9,982,325 – “Systems and Methodologies for Direct Acid Leaching of
Scandium-bearing Ores”,
(ii) May 2018 -USP 9,982,326 – “Solvent Extraction of Scandium from Leach Solutions” and,
(iii)
January 2019 – (# not yet assigned) – “Method and Recovery of Scandium Values from Leach
Solutions”.
Patent Applications Discussion:
• These patent applications cover novel, unique flowsheet designs, applicable to scandium extraction,
from scandiferous laterite resources;
• The patented designs are largely supported by test work done with Nyngan Scandium Project
resource material and known design parameters;
• The patents cover HPAL system material flows, solvent extraction (SX), ion exchange systems
(“IX”), atmospheric tank and heap leaching systems and techniques, and processes for directly
making select master alloys containing scandium; and
• Most of the designs are incorporated as part of the DFS.
These patent applications, filed with the US Patent Office, protect the Company’s position and rights to the
intellectual property (IP) contained and identified in the applications as of the date filed, within the
worldwide jurisdiction limits of the US patent system. Review by the US Patent Office takes further time,
but the dates of filing these patents define the basis of IP ownership claims, as is generally afforded U.S.
patent-holders.
The Company intends to utilize the IP contained in these process patents in the development of process
flowsheets for recovery of scandium from its Nyngan Scandium Project, as well as its Honeybugle project.
The Company believes that patent protection of these specific, novel process designs will be granted. Many
of the basic design elements contemplated in the Nyngan Scandium Project flowsheet are commonly
applied to other specialty metals, particularly nickel. However, the application of these basic design
elements has not been commonly applied to scandium extraction from laterite resources, and there are
enough intended and required operational differences in the application to permit the Company to patent-
protect IP on those differences.
These patent claims are the result of several years of metallurgical test work with independent resource
22
laboratories and specific design work by Willem Duyvesteyn, the Company’s Chief Technology Officer,
using Nyngan property resource material. This work is ongoing. Patent protection on flowsheet intellectual
property will serve to limit or prevent the unauthorized use of that IP by others without the Company’s
consent. We believe these filings are an important action to protect the ownership of a Company asset, on
behalf of all SCY shareholders.
Downstream Scandium Products
In February 2011 we announced results of a series of laboratory-scale tests investigating the production of
aluminum-scandium master alloys directly from aluminum oxide and scandium oxide feed materials,
prepared by the CSIRO. The overall objective of this research was to demonstrate and commercialize the
production of aluminum-scandium master alloy using impure scandium oxide as the scandium source,
potentially significantly improving the economics of aluminum-scandium master alloy production. In 2014,
the Company announced it applied for a US Patent on master alloy production, which is still in the
application phase. That patent application addressed scandium master alloys with both aluminum-base and
magnesium-base metals.
During the 2015-2017 timeframe, we continued our own internal laboratory-scale investigations into the
production of aluminum-scandium master alloys, furthering our understanding of commercial processes,
and achievable recoveries. We advanced our abilities to make a standard-grade 2% scandium master alloy
product typical of commercially available products offered today.
On March 2, 2017, we announced the signing of a Memorandum of Understanding ("MOU") with Weston
Aluminium Pty Ltd. ("Weston") of Chatswood, NSW, Australia. The MOU defines a cooperative
commercial alliance to jointly develop the capability to manufacture aluminum-scandium master alloy. The
intended outcome of this alliance will be to develop the capability to offer Nyngan Scandium Project
aluminum alloy customers scandium in form of Al-Sc master alloy, should customers prefer that product
form.
The MOU outlines steps to jointly establish the manufacturing parameters, metallurgical processes, and
capital requirements to convert Nyngan Scandium Project scandium product into Master Alloy, on Weston's
existing production site in NSW. The MOU does not include a binding contract with commercial terms at
this stage, although the intent is to pursue the necessary technical elements to arrive at a commercial contract
for conversion of scandium oxide to master alloy, and to do so prior to first mine production from the
Nyngan Scandium Project.
On March 5, 2018 the Company announced that it has initiated a pilot scale program at the ALCERECO
Inc. metallurgical research facilities in Kingston, Ontario, to confirm and refine previous work on the
manufacture of aluminum-scandium 2% master alloy (MA). The pilot scale program is intended to confirm
the previous bench-scale test work, and to provide necessary process understanding for commercial scale
upgrade of Nyngan scandium oxide product to master alloy product.
The pilot program consisted of 5 separate trials on two MA product types, production of MA in various
forms, and dross analysis to ascertain scandium recoveries to product. The total mass of master alloy and
product variants produced in the program totalled approximately 20kg. The pilot program, as defined for
2018, was completed in December of 2018. Additional pilot scale work to pursue further refinements and
specific process optimization has been planned for Q1/Q2 of 2019.
On March 5, 2018 the Company also announced that it has filed for patent protection on certain process
refinements for master alloy manufacture that it believes are novel methods, and also on certain product
variants that it believes represent novel forms of introducing scandium more directly into aluminum alloys.
23
Focus on Aluminum Alloy Applications for Scandium Products
The Company is in the process of obtaining sales agreements for scandium products produced from our
Nyngan Scandium Project. Our focus is on the use of scandium as an alloying ingredient in aluminum-
based products. The specific scandium product forms we intend to sell from the Nyngan project include
both scandium oxide (Sc2O3) and aluminum-scandium master alloys (Al-Sc 2%).
Scandium as an alloying agent in aluminum allows for aluminum metal products that are much stronger,
more easily weldable and exhibit improved performance at higher temperatures than current aluminum-
based materials. This means lighter structures, lower manufacturing costs and improved performance in
areas that aluminum alloys do not currently compete.
Aluminum Alloy Research Partner – Alcereco
In 2015, the Company entered into a memorandum of understanding (“MOU”) with ALCERECO Inc. of
Kingston, Ontario (“ALCERECO”), forming a strategic alliance to develop markets and applications for
aluminum alloys containing scandium. To further that alliance, and to reinforce the capability of both
companies to deliver product developed for scandium aluminum alloy markets, Scandium International and
ALCERECO also signed an offtake agreement governing sales terms of scandium oxide product (scandia)
produced from the Nyngan Scandium Project. The offtake agreement specifies prices, delivery volumes
and timeframes for commencement of delivery of scandium oxide product. The offtake agreement does not
provide for a mandatory annual minimum purchase volume of scandium oxide by ALCERECO, and there
is no requirement for payment in lieu of purchase.
The MOU represented keen mutual interest in foundry-based test work on aluminum alloys containing
scandium, based on understandings that ALCERECO’s team had gained from prior work with Alcan
Aluminum, and based on SCY’s twin goals of understanding and identifying quality applications for
scandium, and also understanding the scandium value proposition with customers.
During December 2017, the Company revised and renewed the scandium product offtake agreement with
ALCERECO. The revised agreement extends the deadline for initial production and shipments from the
Nyngan Scandium Project from December 1, 2017, to as late as December 1, 2020. The defined sale product
was changed to an aluminum scandium 2% master alloy from scandium oxide in the prior agreement. The
revised sales agreement covers approximately the same scandium oxide volume as the prior agreement,
representing 55% of Nyngan’s initial twelve month forecast production, and approximately 20% of
nameplate capacity, as established by the Definitive Feasibility Study. The revised offtake agreement does
not provide for a mandatory annual minimum purchase volume of scandium oxide by ALCERECO, and
there is no requirement for payment in lieu of purchase.
The Company has sponsored research work as contemplated by the MOU with ALCERECO, and with other
unrelated entities in separate locations. This work develops and documents the improvement in strength
characteristics scandium can deliver to aluminum alloys without degrading other key properties. The team
has run multiple alloy mix programs where scandium loading is varied, in order to look at response to
scandium additions on a cost/benefit basis. This work has been done in the context of industries and
applications where these particular alloys are popular today.
These programs are focused on 1000 series, 3000 Series, 5000 Series and 7000 Series Al-Sc alloys, and
have served to make independent data and volume samples available for sales efforts.
24
The results of our research work is positive, and consistent with the body of published literature available
today on aluminum scandium alloys. We are observing noteworthy strengthening effects with scandium
additions at and above 0.1%, and dramatic strengthening improvements with additions of 0.35%, while
preserving or enhancing other alloy properties and characteristics. We have also demonstrated that altering
the combinations of scandium loads and alloy hardening process techniques has significant effect on the
final alloy properties, offering the opportunity to tune alloy characteristics to suit specific applications.
These findings are considered commercially sensitive, and the data is not intended for public disclosure at
this time, although the findings and data are being shared with select potential customers under specific
non-disclosure agreement protections, as is deemed relevant to their specific areas of commercial interest,
Letters of Intent with Potential Customers
During 2018, the Company announced signing letter of intent (“LOI”) agreements with eight unrelated
partnering entities. In each LOI, we have agreed to contribute scandium samples, either in form of scandium
master alloy product, or aluminum-scandium alloy product, for trial testing by the partners in their
downstream manufacturing applications. Each of the parties to the LOI agreements have agreed to report
the parameters and general results of the testing program utilizing these scandium-containing alloys, upon
completion of testing. All samples committed by the Company for 2018 delivery, through this LOI program,
have been delivered and received, and all but one of the recipients has initiated testing and reporting activity.
The one remaining recipient has test work planned for Q1 2019. The Company plans to continue this LOI
program of introducing scandium for trial testing by partners through agreements with more potential
customers in 2019.
These formal LOI agreements, with distinct industry segment leaders, represent a key marketing program
demonstrating precisely how scandium will perform in specific products, and in production-specific
environments. Potential scandium customers insist on these sample testing opportunities, directly in their
research facilities or on their shop floor, to ensure their full understanding of the impacts, benefits, and
costing implications of introducing scandium into their traditional aluminum feedstocks.
The partnering entities in these LOI agreements are set out below:
Austal Ltd. (“Austal”), headquartered in Henderson, Western Australia, (Australia). Austel is a public
corporation, listed on the Australian Stock Exchange (ASB.ASX), with shipbuilding facilities in Perth,
Australia, Mobile, Alabama (USA), Vung Tau, Vietnam and Balamban, Cebu (Philippines). The company
maintains a focus on research and development of emerging maritime technologies and cutting-edge ship
designs, and is today a recognized world leader in the design and construction of large aluminum
commercial and defense vessels.
Impression Technologies Ltd. ("ITL"), based in Coventry, UK. ITL is a privately held technology
company, developing and licensing its advanced aluminum forming technology, Hot Form Quench
("HFQ®"), to automotive, aerospace, rail and electronics industries, globally. ITL manufactures custom
parts for customers with its patented HFQ technology, which enables the single-pass forming of complex,
lightweight, high-strength aluminum parts that can't otherwise be similarly formed today.
PAB Coventry Ltd. (“PAB”), based in Coventry, UK. PAB is a privately held manufacturing and
prototyping company offering specialty metal parts and design capabilities, serving the automotive,
aerospace, defense and HVAC industries. PAB has been a well-known parts and forms supplier to the
upper market segment of the British automotive industry for decades.
Eck Industries Inc. ("Eck"), based in Manitowoc, Wisconsin, USA. Eck is a privately held manufacturer of
precision sand cast parts, and engineering services. Eck Industries operates a 210,000 sq. ft. facility with
25
over 250 employees, and 110 customers. Customer segments include commercial aircraft parts, automotive
and trucking cast parts, military drivetrain casings, marine propulsion system castings, and military
aerospace components.
Grainger & Worrall Ltd. ("GW"), based in Shropshire, UK. GW is a privately held manufacturer of
precision sand cast parts, and engineering services. GW is a well-recognized precision air-set sand cast
parts manufacturer in the UK, specializing in low to intermediate volume cast parts for commercial
automotive, motorsports/racing, defense, marine, and aerospace applications.
Gränges AB (“Gränges”), based in Stockholm, Sweden. Gränges is a public company, traded on the
NASDAQ Stockholm Stock Exchange (GRNG:OMX), and a large global player in the rolled aluminum
products business, with production assets in Europe, USA, and China, and a worldwide customer base,
majority concentrated in the USA. Gränges is focused on advanced aluminum materials, and holds a leading
global position in rolled products for brazed heat exchangers, which it estimates at 20%.
Ohm & Häner Metallwerk GmbH & Co. GK (“O&H”), based in Olpe, Germany. O&H is a privately held
manufacturer of sand cast and gravity die cast parts, using metal alloys, servicing a significant, global
customer base. O&H produces over 3,000 individual cast parts, and currently works with over 40 different
alloys, primarily aluminum and copper-based alloys.
AML Technologies ("AML"), an Adelaide, Australia based start-up company with proprietary technology
for applying aluminium alloys to additive layer manufacturing processes, also commonly referred to as 3D
printing.
These LOI agreements are part of a developing strategy by the Company to engage with innovative,
research-capable partners, willing to test scandium in their applications. The Company also has similar
agreements with other research capable partners who do not wish to be publicly named at this time. We
are selecting and approaching these specific partners because we have an understanding, from our
commissioned alloy mixing programs, that scandium additions can make valuable contributions to their
specific products, and we have the alloy samples to enable an expedient uptake on that validation. The
scandium market for aluminum alloys needs to be built, and that construction should be seen as underway
in the most direct sense. The Company plans to conduct further application-specific programs, in pursuit
of sales contracts with quality customers across numerous industry segments, predominantly existing
aluminum alloy consumers.
Nyngan Scandium Project - Planned Activities for 2019-2020
The following steps are planned for Nyngan during the 2019 and 2020 Calendar years:
• Complete master alloy pilot trials and optimization work in Q1/Q2 2019
• Pursue additional offtake agreements in support of planned future scandium sales,
• Seek project construction financing for the Nyngan Scandium Project in 2019,
• Commence site construction in the latter half of 2019, with anticipated construction completion
over 14 months, and
Initiate project commissioning in late 2020, with product available for sale by the start of 2021.
•
26
Honeybugle Scandium Property
On April 2, 2014 the Company announced that it had secured a 100% interest in an exploration license (EL
7977) covering 34.7 square kilometers in New South Wales (NSW), Australia referred to as the Honeybugle
Scandium property. The license area is located approximately 24 kilometers west-southwest from SCY’s
Nyngan Scandium Project. The license area covers part of the Honeybugle geologic complex, and will carry
that name in our future references to the property. The ground was released by the prior holder, and SCY
intends to explore the property for scandium and other metals.
The Company currently does not consider the Honeybugle Scandium property to be a material property at
this time. No resources or reserves are known to exist on the property. The property is classified as an
Australian property for purposes of financial statement segment information.
The location of the Honeybugle Scandium property is provided below.
Figure 4. Location of Honeybugle Scandium property
Honeybugle Drill Results
On May 7, 2014 the Company announced completion of an initial program of 30 air core (AC) drill holes
on the property, specifically at the Seaford anomaly, targeting scandium (Sc). Results on 13 of these holes
are shown in detail in the table below. These holes suggest the potential for scandium mineralization on the
property similar to our Nyngan Scandium Project.
Highlights of initial drilling program results are as follows:
• The highest 3-meter intercept graded 572 ppm scandium (hole EHAC 11);
• EHAC 11 also generated two additional high grade scandium intercepts, grading 510 ppm and 415
ppm, each over 3 meters;
• The program identified a 13-hole cluster which was of particular interest;
•
Intercepts on these 13 holes averaged 270 ppm scandium over a total 273 meters at an average
continuous thickness of 21 meters per hole, representing a total of 57% (354 meters) of total initial
program drilling;
• The 13 holes produced 29 individual (3-meter) intercepts over 300 ppm, representing 31% of the
mineralized intercepts in the 273 meters of interest; and
27
• This initial 30-hole AC exploratory drill program generated a total of 620 meters of scandium
drill/assay results, over approximately 1 square kilometer on the property.
The detail results of 13 holes in the initial drill program are as follows:
Table 7. Results of 13-Hole Initial Drill Program
Seaford is characterized by extensive outcrops of dry, iron-rich laterites, allowing for a particularly shallow
drill program. Thirty (30) air core (AC) holes on nominal 100-meter spacing were planned, over an area of
approximately 1 square kilometer. Four holes were halted in under 10 meters depth, based on thin laterite
beds, low scandium grades, and shallow bedrock.
The 13 holes highlighted in the table are grouped together on either side of Coffills Lane, and represent all
of the drill locations where meaningful intercept thickness generated scandium grades exceeding 175 ppm.
Some of these 13 holes showed significant scandium values on the immediate surface, and alternately, other
holes exhibited favorable scandium grades that began at shallow depth. The highest grade Sc sample was
found in a 21-24 meter interval (572 ppm), although several holes produced better than 350 ppm Sc
intercepts at depths of under 9 meters. The deepest hole (EHAC 7) was drilled to 57 meters, showing good
scandium grades over a 12-meter horizon (245 ppm) near the bottom of the hole, from 39 to 51 meters
28
Honeybugle 30 Hole Drill Program - April 2014 Target-ScandiumHoneybugleFromToInterceptTotalDrill HoleDrillHole(meter(meterLengthScandiumNumberAreaTypedepth)depth)(meters)Grade (ppm)EHAC 1SeafordExplore (AC)214221218including27369262EHAC 2SeafordExplore (AC)01212300including099333EHAC 3SeafordExplore (AC)3129295including693352EHAC 5SeafordExplore (AC)01515244including12153333EHAC 6SeafordExplore (AC)02424185including099214including18246214EHAC 7SeafordExplore (AC)95142225including154227220including42519252EHAC 9SeafordExplore (AC)62721272including92415350EHAC 10SeafordExplore (AC)01818251EHAC 11SeafordExplore (AC)03030369including9156461including21243572EHAC 12SeafordExplore (AC)02121177EHAC 26SeafordExplore (AC)02121309Seafordincluding31815343EHAC 28SeafordExplore (AC)01818344Seafordincluding31512363EHAC 29SeafordExplore (AC)32118316including9189396Assumes 175 ppm cut-off grade
depth. Higher scandium grades were associated with higher iron levels. Holes were drilled to a depth where
they contacted the fresh ultramafic bedrock, which generally signaled the end of any scandium enrichment
zones.
The drill plan divided Seaford into four sub-areas, 1-4, as highlighted Figure 5, below. Area 1 was relatively
higher ground and therefore the least impacted by ground moisture. Consequently, this dryer area received
the greatest attention, although that had been the general intention in the plan. Area 1 received 17 holes,
with 13 presented in detail in the table above. Areas 2-4 were each intended as step-out areas that need to
be further examined in the next program. The three step-out areas did not generate results of particular
note, although hole locations were not optimal due to ground conditions and access.
Area 2 received 3 holes, 60 meters total, and generated Sc grades from 45-75 ppm,
Area 3 received 4 holes, 87 meters total, and generated Sc grades from 47-122 ppm,
Area 4 received 5 holes, 72 meters total, and generated Sc grades from 60-101 ppm, and
The average depth of all of these holes was 18 meters, with the deepest 30 meters.
Figure 5. Initial Drill Program Map
This 13-hole cluster (Area 1) was noted to be in a relatively thick laterite zone which was constrained to
the west by contact with meta-sediments, to the east by fresh ultramafic bedrock, and to some extent in the
north by a poor intersection result in hole 30. Area 1 remains somewhat open to the south, with the two
southern-most holes (EHAC 9 and EHAC 29) generating some of the best scandium grade intercepts in the
area.
The surface and near surface mineralization at this property is an advantage, both in locating areas of interest
for future exploration work, and also because of extremely low overburden ratios. This particular
characteristic for the Honeybugle Scandium property is different to our Nyngan Scandium Project, where
mineralization is typically covered by 10-20 meters of barren alluvium.
29
Drill Area 2Drill Area 4Drill Area 1Drill Area 3HighlightedDrill Results
Further drilling at Seaford is warranted, based on the results of this introductory and modest program,
specifically to the north and south of the existing area 1 drill pattern, along with investigation and select
drilling at the other three remaining anomalies on the property.
During 2018 we performed site work at the Honeybugle Scandium property to meet the annual expenditure
commitment to maintain the exploration license. Work performed during 2018 does not change the
previous conclusions, as described above.
Qualified Person and Quality Assurance/Quality Control
John Thompson, B.E. (Mining); Vice President - Development at SCY is a qualified person as defined in
NI 43-101 and has reviewed the technical information on this property. The drilling, sampling, packaging
and transport of the drill samples was carried out to industry standards for QA/QC. SCY employed an
independent local geology consulting and drill supervisory team, Rangott Mineral Exploration Pty. Ltd.,
(RME) of Orange, NSW, Australia, to manage the drill work on-site. Bulk samples of drill returns were
collected at one metre intervals from a cyclone mounted on the drilling rig, and a separate three-tier riffle
splitter was used on site to obtain 2.0-4.5kg composite samples collected over 3 metre intervals, for assay.
Individual sample identifiers were cross-checked during the process. The assay samples were placed in
sealed polyweave bags which remained in RME’s possession until the completion of the drilling program,
at which time they were transported to RME’s office in Orange. There, the sequence of sample numbers
was validated, and the assay samples were immediately submitted to Australian Laboratory Services’
(ALS’) laboratory in Orange. The remnant bulk samples, which were collected in sealed polythene bags,
were transported by RME to a local storage unit at Miandetta, for long-term storage.
ALS/Orange dried and weighed the samples, and pulverized the entire sample to 85% passing 75 microns
or better (technique PUL-21). These 50g sample bags of pulps were then sent to the ALS laboratory at
Stafford in Brisbane, Queensland for analysis. ALS/Brisbane analyzed the pulps for scandium, nickel,
cobalt, chromium, iron and magnesium, using Inductively Coupled Plasma Atomic Emission Spectroscopy
(ICP-AES) after a four acid (total) digestion (technique ME-ICP61). The lower detection limit for scandium
using this technique is 1ppm. For their internal quality control, ALS/Brisbane added 4 standard samples
(for 20 repeat analyses), 10 blank samples and 16 duplicate samples to the batch. Please see news release
see news release dated May 7, 2014 and available on www.sedar.com for further information on the
Honeybugle drill results.
Kiviniemi Scandium Property (Eastern Finland Province, Finland)
On September 25, 2017 the Company announced that its wholly-owned subsidiary company, Scandium
International Mining Corp., Norway AS, was granted a reservation on an Exploration License for the
Kiviniemi Scandium property in central Finland from the Finnish regulatory body governing mineral
exploration and mining in Finland. The exploration license was subsequently granted during August 2018.
We are in the process of moving all our exploration rights to SCY Exploration Finland Oy, a wholly owned
Finnish subsidiary.
The Geological Survey of Finland (“GTK”) conducted airborne survey work on the area in 1986, conducted
exploration drilling on the property in 2008-2010, and published those program results on their public GTK
website in 2016.
The Company does not consider the Kiviniemi Scandium property to be a material property at this time.
No NI 43-101 resources or reserves are known to exist on the property. The property is classified as the
Finland property for purposes of financial statement segment information.
30
Highlights
• Kiviniemi property previously identified for scandium and explored by GTK,
• Property is a high iron content, medium grade scandium target, located on surface, with on-site
upgrade potential,
• Early resource upgrade work done for GTK promising, confirmed by SCY,
• Property is all-weather accessible, close to infrastructure, and
• Finland location is mining-friendly and ideally suited to EU customer markets.
Property/Location
The Kiviniemi property is located in the municipality of Rautalampi, Eastern Finland Province,
approximately 350km northeast of Helsinki, by road. The closest major city/airport is Kuopio (pop.
110,000), approximately 70km to the northeast of the property. The exploration target is located on a small
portion of a family farm, partially cleared for farming. Most of the property is wooded, including the area
where the mineralization has been located,
Mineral Reservation
The Company applied for a reservation on the property in early 2017, which was granted in June 2017, after
the public comment period ended. The reserved exploration area is approximately 24.6 hectares (0.25
square kilometer), identical to the historic GTK exploration license on the property, which expired in 2015.
The mineralized area, as defined on GTK resource modeling maps, is approximately 25% of the total
reservation. This reservation granted us a first position right to apply for an exploration license on the
property (protected through 2018). The Company filed the exploration application in January 2018, and
was granted the exploration license during August 2018. We are in the process of moving all our exploration
rights to SCY Exploration Finland Oy, a wholly owned Finnish subsidiary. The exploration license requires
us to report our exploration activities annually to Finland government agencies and to demonstrate in the
annual reports that exploration work has been effective and systematic.
Prior Exploration Work
GTK performed magnetic surveys on the general area in 1986, focused on copper/nickel/cobalt targets, and
based on current mining activity in the area. That initial field work located a significant magnetic anomaly
on the Kiviniemi property. In 2008, GTK initiated an exploration drilling program on the property,
completing 4 diamond core holes in that first program phase, followed by a further 5 diamond holes in
2010, totaling 1,250 meters, at an average (angled) length of 139 meters, and a maximum vertical extension
of 167 meters. The drill spacing varied from 50-200 meters, using a diamond drill size of 46mm (T56).
Four of the nine total holes drilled (approx. 850 meters) are in the mineralized area, with the remainder
defining portions of the mag zone that did not contain scandium. The mag zone is generally very high in
iron, ranging from about 20% to 35% Fe. The GTK published the results of the drill program assays, and
other information on the geology and mineralization, on their website in 2016.
Geology of Resource Target
The host rock is very iron-rich, garnet-bearing fayalite ferro(monzo) diorite. The main minerals in the
deposit include: plagioclase, potassium feldspar, ferrohedenbergite (clinopyroxene), ferrohastingsite
(amphibole), almandine garnet and fayalite. The principal scandium carrier minerals are ferrohastingsite
(59 %) and ferrohedenbergite (40 %).
31
Resource Modeling
GTK completed and published a paper outlining property work including a 3D modeling and resource
estimation on the project, in March 2016. The authors employed data from 6 holes, and used an industry
standard GEOVIA Surpac software to produce a geological 3D domain model, and inverse distance was
run to estimate resource grades into the block model. The authors declined to specifically characterize the
resource on the basis of limited holes and uneven spacing, describing their estimate as an “exploration
potential measurement”. The authors estimated that another 500-700 meters of drilling (5-7 holes) would
establish 50 meter centers on the target and allow a resource classification. The mineralized target remains
open at depth. The authors did provide a table of results on tonnage estimates from their modeling work, at
various cut off values, excerpts of which are presented below.
The Company believes the standards and controls employed by GTK are reliable and consistent with proper
industry practice. However, the potential quantity and grade is conceptual in nature and there has been
insufficient exploration to define a mineral resource and it is uncertain whether further exploration will
result in a mineral resource. The Company considers the above estimates as historical in nature, and such
estimates do not use the categories prescribed by NI 43-101. A qualified person (as defined in NI 43-101)
has not done sufficient work to classify the historical estimate as a current mineral resource. The Company
is not treating the historical estimate as a current mineral resource.
Metallurgical Upgrade Work
In 2010, GTK engaged their metallurgical research laboratory (at Outokumpu) to conduct standard upgrade
testing on the drill core sample material, specifically magnetic gravity separations. The mag separation
work suggested a scandium upgrade to approximately 346ppm, based on a resource material head grade of
160-200ppm, and a 72% scandium recovery.
In June 2017, SCY engaged FLSmidth (Salt Lake City, Utah) seeking to duplicate the earlier 2010 upgrade
work and confirm the earlier results. The earlier results were generally confirmed, in that the 2017 work
achieved magnetic separation upgrade assays of 286ppm on a resource material head grade of 186ppm. We
supplied FLSmidth with approximately 16kg of resource material sourced from GTK, all samples from a
single hole (P433-R3). FLSmidth also carried out scandium check assays on the individual drill hole
samples provided by GTK, with good grade correlation to GTK data.
Kiviniemi Summary
32
Kiviniemi Scandium Property - GTK Resource Potential EstimateEstimatedPotentialSc Cut Off Average Grade Estimate (ppm)Tonnage (Mt)Grade (ppm)ScandiumYttriumZirconium12.660170.180.5174512.5100170.980.3174411.1150173.380.21830SOURCE: Publication, GTK, "3D Modeling and Mineral Resource Estimation of the Kiviniemi Scandium Deposit, Eastern Finland". Authors, Janne Hokka & Tapio Halkoaho
The Kiviniemi property represents a medium grade scandium resource target that has remained
unrecognized and overlooked by exploration work, largely due to the absence of the more commonly
sought-after minerals in the region, specifically copper, nickel and cobalt. We believe that Kiviniemi is
Europe’s largest underdeveloped primary scandium resource.
The target has benefited significantly from valuable early exploration work by the GTK, which has
advanced the property to a stage where successful metallurgical investigations may prove value that offsets
grade concerns. SCY estimates roughly US$2M of work value has been directed at this property to date,
including field work, drilling programs, assay work, overheads, and metallurgical upgrade studies, but firm
numbers are not available.
We plan a limited drill program to augment the existing GTK data, and provide more sample material for
metallurgical test work programs to define economic site upgrade possibilities on the scandium
mineralization observed to date.
ITEM 3. LEGAL PROCEEDINGS
We are not a party to any pending legal proceedings and, to the best of our knowledge, none of our
properties or assets are the subject of any pending legal proceedings.
ITEM 4. MINE SAFETY DISCLOSURES
The Company has no active mining operations or dormant mining assets at this time, and has no outstanding
mine safety violations or other regulatory safety matters to report.
PART II
ITEM 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED STOCKHOLDER
MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
Price Range of Common Shares
The principal market on which our common shares are traded is the Toronto Stock Exchange. Our common
shares commenced trading on the Toronto Stock Exchange on April 24, 2008 under the symbol “GP”.
Effective March 11, 2009, the common shares were listed and posted for trading on the Toronto Stock
Exchange under the symbol “EMC”. Effective November 28, 2014, the common shares were listed and
posted for trading on the Toronto Stock Exchange under the symbol “SCY”. The following table shows
the high and low trading prices of our common shares on the Toronto Stock Exchange for the periods
indicated.
Year
Fiscal Year ended December 31, 2018
First quarter
Second quarter
Third quarter
High
(C$)
0.240
0.190
0.280
Low
(C$)
0.165
0.125
0.145
33
Year
Fourth quarter
Fiscal Year ended December 31, 2017
First quarter
Second quarter
Third quarter
Fourth quarter
High
(C$)
0.285
0.475
0.455
0.425
0.350
Low
(C$)
0.200
0.255
0.300
0.270
0.220
Exchange Rates
We maintain our books of account in United States dollars and references to dollar amounts herein are to
the lawful currency of the United States except that we are traded on the Toronto Stock Exchange and,
accordingly, stock price quotes and sales of stock are conducted in Canadian dollars (C$). The following
table sets forth, for the periods indicated, certain exchange rates based on the noon rate provided by the
Bank of Canada. Such rates are the number of Canadian dollars per one (1) U.S. dollar (US$). The high
and low exchange rates for each month during the previous six months were as follows:
January 2019
December 2018
November 2018
October 2018
September 2018
August 2018
High
1.3600
1.3642
1.3302
1.3142
1.3188
1.3152
Low
1.3221
1.3191
1.3088
1.2803
1.2905
1.2917
The following table sets out the exchange rate (price of one U.S. dollar in Canadian dollars) information as
at each of the years ended December 31, 2017 and 2018.
Rate at end of Period
Low
High
Year Ended December 31
(Canadian $ per U.S. $)
2018
2017
1.2771
1.3610
1.2128
1.2288
1.3642
1.3743
As of February 28, 2019, there were 104 registered holders of record of the Company’s common shares and
an undetermined number of beneficial holders.
Dividends
We have not paid any cash dividends on our common shares since our inception and do not anticipate
paying any cash dividends in the foreseeable future. We plan to retain our earnings, if any, to provide funds
for the expansion of our business.
Securities Authorized for Issuance under Compensation Plans
The following table sets forth information as at December 31, 2018 respecting the compensation plans
under which shares of the Company’s common stock are authorized to be issued.
34
Number of securities
to be issued upon
exercise of
outstanding options,
warrants and rights
Weighted-average
exercise price of
outstanding options,
warrants and rights
(b)
(a)
29,065,000
C$0.194
Number of securities
remaining available
for future issuance
under equity
compensation plans
(excluding securities
reflected in column
(a))
(c)
16,652,194
Nil
Nil
Nil
29,065,000
C$0.194
16,652,194
Plan Category
Equity compensation
plans approved by
security holders
Equity compensation
plans not approved by
security holders
Total
Purchases of Equity Securities by the Company and Affiliated Purchasers
Neither the Company nor an affiliated purchaser of the Company purchased common shares of the Company
in the year ended December 31, 2018.
ITEM 6. SELECTED FINANCIAL DATA
Not applicable.
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND
RESULTS OF OPERATIONS
Overview
The Company is a specialty metals and alloys company focusing on scandium and other specialty metals.
The Company was incorporated under the laws of the Province of British Columbia, Canada in 2006. The
Company currently trades on the Toronto Stock Exchange under the symbol “SCY”.
The Company’s focus is on the exploration and evaluation of its specialty metals assets, specifically the
Nyngan Scandium Project and Honeybugle Scandium property located in New South Wales, Australia and
the Kiviniemi scandium prospect in Finland, all of which are 100% owned by SCY. The Company is an
exploration stage company and anticipates incurring significant additional expenditures prior to production
at any and all of its properties.
In fiscal 2017, the Company exchanged a 20% interest in its Australian subsidiary which holds the Nyngan
Scandium Project and Honeybugle Scandium property for 58,830,645 common shares of the Company.
Accordingly, the Company now holds 100% interest in its Australian subsidiary as at period end.
35
These consolidated financial statements have been prepared on a going concern basis that contemplates the
realization of assets and discharge of liabilities at their carrying values in the normal course of business for
the foreseeable future. These financial statements do not reflect any adjustments that may be necessary if
the Company is unable to continue as a going concern.
The Company currently earns no operating revenues and will require additional capital to advance both the
Nyngan Scandium Project and the Honeybugle property. The Company’s ability to continue as a going
concern is uncertain and is dependent upon the generation of profits from mineral properties, obtaining
additional financing and maintaining continued support from its shareholders and creditors. These are
material uncertainties that raise substantial doubt about the Company’s ability to continue as a going
concern. If additional financial support is not received or operating profits are not generated, the carrying
values of the Company’s assets may be adversely affected.
RESULTS FOR THE YEAR ENDED DECEMBER 31, 2018
Liquidity and Capital Resources
At December 31, 2018, we had working capital of $177,122 including cash of $284,757 and current
liabilities of $146,586 as compared to working capital of $323,231 including cash of $343,434 at December
31, 2017.
At December 31, 2018, we had a total of 29,065,000 (2017 – 23,585,000) stock options exercisable between
C$0.10 and C$0.60 (2017 – between C$0.10 and C$0.60) which have the potential upon exercise to generate
a total of C$5,635,350 (2017 – C$4,307,800) in cash over the next four and a half years. There is no
assurance that these securities will be exercised.
Our continued development is contingent upon our ability to raise sufficient financing both in the short and
long term. There are no guarantees that additional sources of funding will be available to us; however,
management is committed to pursuing all possible sources of financing to execute our business plan.
Our major capital requirement in the next 12 months relates to the start of construction on the Nyngan
Scandium Project.
The Company will need additional funding to develop the Nyngan project into a mine in the last half of
2019 and will seek to raise additional equity financing at that time.
Results of Operations
Quarter ended December 31, 2018
The net loss for the quarter decreased by $20,136 to $543,316 from a loss of $563,452 in the prior year
mainly as a result of lower exploration, salaries and stock-based compensation. Details of the individual
items contributing to the decreased loss are as follows:
36
Q4 2018 vs. Q4 2017 - Variance Analysis (US$)
Item
Salaries and benefits
Variance
Favourable /
(Unfavourable)
$42,563
Stock based
compensation
$33,838
Explanation
The Vice President Project and Market Development resigned
from the Company during July 2018 which has resulted in this
favourable variance when compared to Q4 2017.
The decrease in stock option compensation (favourable
variance) is due primarily to the issuance of 250,000 options
in Q4 of 2017. There were no stock options issued in Q4 of
2018.
Exploration
$26,281
During the Q4 of 2018, there was reduced spending on testing
of new alloys as compared to Q4 of 2017.
Professional fees
$11,761
The lower costs in Q4 2018 are attributable to reduced legal
fees in the Company’s activities when compared to Q4 2017.
Travel
$5,866
Higher travel costs in Q4 2017 as compared to Q4 2018 are
associated with marketing scandium in Europe and Asia.
Foreign exchange
$1,489
When comparing Q4 2018 versus Q4 2017 the exposure costs
for foreign exchange were relatively the same.
Insurance
Amortization
($267)
($418)
Slightly higher insurance premiums in 2018 resulted in this
minor negative variance.
In Q3 2018, the Company replaced computer equipment in its
Sparks office resulting in higher amortization costs. Prior to
this addition the fixed assets had been fully depreciated in the
second half of 2018.
Consulting
($45,311)
In mid-2018 a senior management position was vacated and
replaced with consultants. In addition, a consultant was hired
during late 2017 to assist with North American marketing.
These factors contributed to the negative variance.
General and
administrative
($55,666)
The higher general and administrative costs in 2018 when
compared to 2017 are due to a significant increase in the
property tax levy for the Nyngan project.
Results of Operations for the Year ended December 31, 2018
The net loss for the year increased by $170,518 to $2,961,108 from $2,790,590 in the prior year, mainly
because of increased foreign exchange losses, general and administrative costs and consulting fees. Details
37
of the individual items contributing to the decreased net loss are as follows:
2018 vs. 2017 - Variance Analysis (US$)
Item
Consulting
Variance
Favourable /
(Unfavourable)
($134,891)
General and
administrative
($121,700)
Foreign exchange
loss
($115,422)
Costs allocable to
non-controlling
interest in a
subsidiary
($73,488)
Exploration
($19,130)
Insurance
($982)
Amortization
($79)
Explanation
In mid-2018 a senior management position was vacated and
replaced with a consultant. In addition, a consultant was hired
in late 2017 to assist with North American marketing. These
factors contributed to the negative variance.
The higher general and administrative costs in 2018 when
compared to 2017 are due to increased spending on marketing
and investor relations as well as a significant increase in
property taxes on the Company’s Nyngan property
The Company maintains a significant portion of its cash in
Canadian and Australian currencies. American dollar made
strong gains when compared to the Canadian and Australian
dollars in Q4 2018. The opposite occurred in 2017,
contributing to this unfavorable variance.
20% of the losses incurred in the Nyngan Scandium Project to
October 6, 2017, are allocated to the minority partner interest,
effectively reducing the Company loss for the year. With the
conversion of the minority interest into Company shares in late
2017, there is no longer an allocation of losses.
In 2018 the Company expended $322,883 on exploration an
increase of 3.4% over 2017. The slightly higher cost is due to
continued aluminum alloy testing.
Slightly higher insurance premiums for the Company when
compared to one year ago results in this minor negative
variance.
In Q3 2018, the Company replaced computer equipment in its
Sparks office resulting in higher amortization costs. Prior to
this addition the fixed assets had been fully depreciated in the
second half of 2018.
Professional fees
$1,590
The favorable variance is due to lower legal fees when
compared to 2017.
Travel and
entertainment
$9,043
This favourable variance reflects the fact that in 2018 trips to
Australia for Nyngan project site activities were less frequent
than in 2017.
38
2018 vs. 2017 - Variance Analysis (US$)
Item
Salaries and
benefits
Stock-based
compensation
Variance
Favourable /
(Unfavourable)
$79,375
$205,166
Explanation
A senior staff position was vacated in mid-2018 and the
position was not replaced with a staff person. This accounts
for the favorable variance when compared to 2017.
The computation of stock-based compensation expense is
dependent upon the number of options issued, the share price
on the date of grant and historic variability of stock price. The
lower share price for stock options issued on 2018 has resulted
in lower expenses when compared to 2017 when stock options
expensed were based on higher share prices.
Cash flow discussion for the year ended December 31, 2018 compared to December 31, 2017
The cash outflow from operating activities increased by $244,762 to $1,793,962 (2017 – $1,549,200) due
to higher consulting and general and admin costs which were partially offset by lower salary costs.
Cash flows used in investing activities increased by $19,821 to $19,821 (2017 – $Nil) due to the
replacement of computer servers at the Sparks office and the purchase of a reclamation bond on the
Kiviniemi property.
Cash inflows from financing activities of $1,755,106 reflect greater private placements of $593,050
partially offset by lower exercise of stock options of $115,344, resulting in an increase of $477,706 when
compared to the year ending December 31, 2017 of $1,277,400.
Summary of quarterly results (US$)
Q4
-
2018
Q3
-
Q2
-
Q1
-
Q4
-
2017
Q3
-
Q2
-
Q1
-
(543,316)
(461,781)
(626,398) (1,329,613) (563,452)
(409,069)
(490,303) (1,327,766)
(0.00)
(0.00)
(0.00)
(0.01)
(0.00)
(0.00)
(0.00)
(0.01)
Net Sales
Net Income
(Loss)
Basic and
diluted
Net Income
(Loss) per
share
Financial Position
Cash
The decrease in cash of $58,677 to $284,757 (2017 - $343,434) results from increased operating costs which
is partially offset by higher common share issuances.
39
Prepaid expenses and receivables
Prepaid expenses and receivables have decreased by $7,035 to $38,951 (2017 - $45,986) due to lower value
added tax receivables in both Australia and Canada.
Reclamation bond
A reclamation bond of $11,444 has been purchased for the Kiviniemi property. (2017 - $Nil)
Property, plant and equipment
Property plant and equipment consists of office furniture and computer equipment at the Sparks, Nevada
office. The increase of $7,327 to $9,274 at December 31, 2018 (2017 - $Nil) is due to replacement of
computer servers at the Sparks office.
Mineral interests
Mineral interests remained at $704,053 at December 31, 2018 (2017 - $704,053).
Accounts Payable, Accounts payable with related parties and Accrued Liabilities
Accounts payable, accounts payable with related parties and accrued liabilities have increased by $80,397
to $146,586 at December 31, 2018 (2017 – $66,189) due to late 2018 invoices received for alloy testing
and property taxes on the Nyngan property.
Capital Stock
Capital stock increased by $1,775,442 to $108,244,311 (2017 - $106,468,869) due to private placements of
$1,675,300 and stock option exercises of $79,806.
Additional paid-in capital decreased by $1,058,328 to $5,675,812 (2017 - $4,617,474) as a result of stock
option expensing which was partially offset by stock option exercises.
Treasury shares remained at $1,264,194 through the 2018 fiscal period.
Off-balance sheet arrangements
At December 31, 2018, we had no material off-balance sheet arrangements such as guarantee contracts,
contingent interest in assets transferred to an entity, derivative instruments obligations or any obligations
that trigger financing, liquidity, market or credit risk to us.
Additional Information and Accounting Pronouncements
Outstanding share data
At February 28, 2019 we had 304,781,294 issued and outstanding common shares and 29,065,000
outstanding stock options at a weighted average exercise price of C$0.194. No warrants are outstanding
at February 28, 2019.
40
Critical Accounting Estimates
The preparation of financial statements in conformity with generally accepted accounting policies requires
our management to make estimates and assumptions that affect the reported amounts of assets and liabilities
at the date of the financial statements and the reported amounts of revenues and expenses during the
reporting period. These estimates are based on past experience, industry trends and known commitments
and events. By their nature, these estimates are subject to measurement uncertainty and the effects on the
financial statements of changes in such estimates in future periods could be significant. Actual results will
likely differ from those estimates.
Stock-based compensation
We use the Black-Scholes option pricing model to calculate the fair value of stock options and
compensatory warrants granted. This model is subject to various assumptions. The assumptions we make
will likely change from time to time. At the time the fair value is determined, the methodology that we use
is based on historical information, as well as anticipated future events. The assumptions with the greatest
impact on fair value are those for estimated stock volatility and for the expected life of the instrument.
Deferred income taxes
We account for tax consequences of the differences in the carrying amounts of assets and liabilities and our
tax bases using tax rates expected to apply when these temporary differences are expected to be settled.
When the deferred realization of income tax assets does not meet the test of being more likely than not to
occur, a valuation allowance in the amount of the potential future benefit is taken and no future income tax
asset is recognized. We have taken a valuation allowance against all such potential tax assets.
Mineral properties and exploration and development costs
We capitalise the costs of acquiring mineral rights at the date of acquisition. After acquisition, various
factors can affect the recoverability of the capitalized costs. Our recoverability evaluation of our mineral
properties and equipment is based on market conditions for minerals, underlying mineral resources
associated with the assets and future costs that may be required for ultimate realization through mining
operations or by sale. We are in an industry that is exposed to a number of risks and uncertainties, including
exploration risk, development risk, commodity price risk, operating risk, ownership and political risk,
funding and currency risk, as well as environmental risk. Bearing these risks in mind, we have assumed
recent world commodity prices will be achievable. We have considered the mineral resource reports by
independent engineers on the Nyngan project in considering the recoverability of the carrying costs of the
mineral properties. All of these assumptions are potentially subject to change, out of our control, however
such changes are not determinable. Accordingly, there is always the potential for a material adjustment to
the value assigned to mineral properties and equipment.
Recent Accounting Pronouncements
Accounting Standards Update 2018-13 – Fair Value Measurement (Topic 840) Disclosure Framework—
Changes to the Disclosure Requirements for Fair Value Measurement. The amendments in this update apply
to all entities that are required, under existing GAAP, to make disclosures about recurring or nonrecurring
fair value measurements. This standard is effective for interim and annual reporting periods beginning after
December 15, 2019, with early adoption permitted. The Company is currently evaluating the impact this
guidance will have on its financial statements.
41
Accounting Standards Update 2018-11 - Leases (Topic 842) Targeted Update. This accounting
pronouncement is an update to Accounting Standard 2016-02 (see below). This standard allows for an
additional (and optional) transition method. This standard is effective for interim and annual reporting
periods beginning after December 15, 2018, with early adoption permitted. The Company has adopted the
FASB 842-10-50-1 election with no expected material effect to the consolidated financial statements.
Accounting Standards Update 2018-07 – Compensation – Stock Compensation (Topic 718) Improvements
to Nonemployee Share-Based Payment Accounting. This accounting pronouncement deals with
simplification of share-based accounting in efforts to maintain or improve the usefulness of the information
provided to the users of financial statements while reducing cost and complexity in financial reporting. The
areas for simplification in this Update involve several aspects of the accounting for nonemployee share-
based payment transactions resulting from expanding the scope of Topic 718, Compensation—Stock
Compensation, to include share-based payment transactions for acquiring goods and services from
nonemployees. The amendments in this Update are effective for public business entities for fiscal years
beginning after December 15, 2018, including interim periods within that fiscal year. The Company will
adopt this policy with no expected material effect to the condensed consolidated financial statements.
Accounting Standards Update 2017-09 – Compensation – Stock Compensation (Topic 718) Scope of
Modification Accounting. This accounting pronouncement deals with a change in any of the terms or
conditions of a share-based payment award. The standard goes into effect for all interim and annual
statements beginning after December 15, 2017. The Company has adopted this policy with no material
effect to the condensed consolidated financial statements.
Accounting Standards Update 2016-02 - Leases (Topic 842). This accounting pronouncement allows
lessees to make an accounting policy election to not recognize a lease asset and liability for leases with a
term of 12 months or less and that do not have a purchase option that is expected to be exercised. This
standard is effective for interim and annual reporting periods beginning after December 15, 2018, with early
adoption permitted. The Company has adopted this policy with no material effect to the consolidated
financial statements.
Accounting Standards Update 2016-01 – Financial Instruments – Overall (Subtopic 825-10): Recognition
and Measurement of Financial Assets and Financial Liabilities. This accounting pronouncement, which
goes into effect for annual periods beginning after December 12, 2017, is far reaching and covers several
presentation areas dealing with measurement, impairment, assumptions used
in estimating fair value and several other areas. The Company has adopted this policy with no material
effect to the condensed consolidated financial statements.
Financial instruments and other risks
Our financial instruments consist of cash, receivables, accounts payable and accrued liabilities, accounts
payable with related parties, and promissory notes payable. It is management's opinion that we are not
exposed to significant interest, currency or credit risks arising from our financial instruments. The fair
values of these financial instruments approximate their carrying values unless otherwise noted. The
Company has its cash primarily in two commercial banks, one in Vancouver, British Columbia, Canada
and in one in Chicago, Illinois.
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Not applicable.
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
42
The Consolidated Financial Statements of the Company and the notes thereto are attached to this report
following the signature page and Certifications.
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND
FINANCIAL DISCLOSURE
For the fiscal years ended December 31, 2018 and 2017 we did not have any disagreement with our
accountants on any matter of accounting principles, practices or financial statement disclosure.
ITEM 9A. CONTROLS AND PROCEDURES
Disclosure controls and procedures
The Company’s management, including our principal executive officer and our principal financial officer,
evaluated the effectiveness of disclosure controls and procedures (as defined in Exchange Act Rule 13a-
15(e)) as of the end of the period covered by this report. Based on that evaluation, the principal executive
officer and principal financial officer concluded that as of the end of the period covered by this report, the
Company has maintained effective disclosure controls and procedures in all material respects, including
those necessary to ensure that information required to be disclosed in reports filed or submitted with the
SEC (i) is recorded, processed, and reported within the time periods specified by the SEC, and (ii) is
accumulated and communicated to management, including the principal executive officer and principal
financial officer, as appropriate to allow for timely decision regarding required disclosure.
Management’s report on internal control over financial reporting
The Company’s management is responsible for establishing and maintaining adequate internal control over
financial reporting (as defined in Rule 13a-15(f) or 15d-15(f) of the Exchange Act). Management assessed
the effectiveness of our internal control over financial reporting as of December 31, 2017, using criteria
established in Internal Control-Integrated Framework issued in 1992 by the Committee of Sponsoring
Organizations of the Treadway Commission (COSO). Even an effective internal control system, no matter
how well designed, has inherent limitations, including the possibility of human error and circumvention or
overriding of controls and therefore can provide only reasonable assurance with respect to reliable financial
reporting. Furthermore, the effectiveness of an internal control system in future periods can change with
conditions.
A material weakness is a deficiency, or combination of deficiencies, in internal control over financial
reporting such that there is a reasonable possibility that a material misstatement of the Company’s annual
or interim financial statements will not be prevented or detected on a timely basis.
The Company’s management has determined that the internal controls over financial reporting are effective
as of December 31, 2018.
Changes in Internal Control.
There have been no changes in internal control over financial reporting that occurred during the last fiscal
quarter that have materially affected, or are reasonably likely to materially affect, internal control over
financial reporting.
43
ITEM 9B. OTHER INFORMATION
None.
PART III
Information with respect to Items 10 through 14 is set forth in the definitive Proxy Statement to be filed
with the Securities and Exchange Commission on or before April 30, 2019 and is incorporated herein by
reference. If the definitive Proxy Statement cannot be filed on or before April 30, 2019, the Company will
instead file an amendment to this Form 10-K disclosing the information with respect to Items 10 through
14.
PART IV
ITEM 15. EXHIBITS, FINANCIAL STATEMENTS SCHEDULES
Financial Statements
The following Consolidated Financial Statements are filed as part of this report.
Description
Financial statements for the years ended December 31, 2018 and 2017 and
audit reports thereon.
Page
F-1
Exhibits
The following table sets out the exhibits filed herewith or incorporated herein by reference.
Exhibit
3.1
3.2
10.1(3)
10.2(1)
10.3(4)
10.4(5)
10.5(6)
Description
Certificate of Incorporation, Certificate of Name Change dated March 2009, Notice of
Articles dated March 2009(1)
Certificate of Name Change dated November 19, 2014 and Notice of Articles dated
November 19, 2014(2)
Corporate Articles(1)
Amendment to Corporate Articles dated November 10, 2014(2)
2015 Stock Option Plan
Management Contract with George Putnam dated May 1, 2010
Management Contract with Edward Dickinson dated August 13, 2011
Loan Agreement dated June 24, 2014
Share Exchange Agreement dated June 30, 2017
44
21.1(7)
23.1(7)
23.2(7)
23.3(7)
23.4(7)
31.1(7)
31.2(7)
32.1(7)
32.2(7)
List of Subsidiaries
Consent of Davidson & Company LLP
Consent of Stuart Hutchin
Consent of Dean Basile
Consent of Geoffrey Duckworth
Certification Pursuant to Rule 13a-14(a) or 15d-14(a) of the U.S. Securities Exchange
Act of 1934 of the Principal Executive Officer
Certification Pursuant to Rule 13a-14(a) or 15d-14(a) of the U.S. Securities Exchange
Act of 1934 of the Principal Financial Officer
Section 1350 Certification of the Principal Executive Officer and Principal Financial
Officer of the Principal Executive Officer
Section 1350 Certification of the Principal Executive Officer and Principal Financial
Officer of the Principal Financial Officer
(1) Previously filed as exhibits to the Form 10 filed May 24, 2011 and incorporated herein by reference.
(2) Previously filed as exhibits to the Form 10-K filed February 27, 2015 and incorporated herein by reference.
(3) Previously filed as Schedule “A” to the Form DEF 14A filed October 5, 2015 and incorporated herein by reference.
(4) Previously filed as an exhibit to the Form 10-K/A filed May 1, 2014 and incorporated herein by reference.
(5) Previously filed as an exhibit to the Form 10-Q filed August 12, 2014 and incorporated herein by reference.
(6) Previously filed as an exhibit to the Form 8-K filed July 26, 2017 and incorporated herein by reference.
(7) Filed herewith.
45
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant
has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
SIGNATURES
SCANDIUM INTERNATIONAL MINING CORP.
By: /s/ George Putnam
George Putnam
President and Principal Executive Officer
Date: March 1, 2019
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by
the following persons on behalf of the registrant and in the capacities and on the dates indicated.
Signature
Title
Date
/s/ George Putnam
George Putnam
/s/ William Harris
William Harris
President, Principal Executive Officer, and Director March 1, 2019
Chairman and Director
March 1, 2019
/s/ James Rothwell
James Rothwell
Director
/s/ Willem Duyvesteyn Director
Willem Duyvesteyn
/s/ Warren Davis
Warren Davis
Director
/s/ Barry Davies
Barry Davies
Director
/s/ Peter Evensen
Peter Evensen
Director
/s/ R.Christian Evensen Director
R. Christian Evensen
46
March 1, 2019
March 1, 2019
March 1, 2019
March 1, 2019
March 1, 2019
March 1 2019
/s/ Andrew Greig
Andrew Greig
Director
/s/ Edward Dickinson
Edward Dickinson
Principal Accounting Officer and
Principal Financial Officer
March 1, 2019
March 1, 2019
47