Quarterlytics / Consumer Defensive / Tobacco / Grana y Montero S.A.A.

Grana y Montero S.A.A.

gram · NYSE Consumer Defensive
Claim this profile
Ticker gram
Exchange NYSE
Sector Consumer Defensive
Industry Tobacco
Employees 1001-5000
← All annual reports
FY2008 Annual Report · Grana y Montero S.A.A.
Sign in to download
Loading PDF…
PERUVIANS 
BUILDING  
PERU

2008 Annual Report: 75th Anniversary 

2

3

INTRODUCCION

Resultado del Ejercicio

6

Carta del Presidente

8

PERUVIANS 
BUILDING PERU

1933 –1948 

1949 –1967 

1968 –1982 

1983 –1990 

1991–1997

1998– 2006 

16

20

24

28

32

36

STRATEGIC 
DEVELOPMENT

Diversification

44

Concessions

46

Strategic Investments

48

ORGANIZATION

GMD

54

GMI

58

GMP

64

GyM

68

Concar

74

Larcomar

78

4
4

SOCIAL 
RESPONSIBILITY

Social

Human Resource 

Risk prevention and 

Knowledge 

Community Relations

Responsibility

Management

Environment

Management

86

88

94

96

98

CORPORATE 
GOVERNANCE

Corporate Governament

110

ANALYSIS OF 
RESULTS

Informe del Análisis de la Administración

126

ANEXOS

Estados Financieros 

Estados Financieros

Informe Antes del Plazo

Informe Buen Gobierno 

Consolidados

141

187

219

Corporativo

231

2
2

Resultados del Ejercicio
Principales Cifras

Principales Cifras (Miles de Nuevos Soles Valores Constantes a Diciembre 2008)

Actividad

Facturación

Utilidad Bruta

Utilidad antes de impuestos

Utilidad Neta

UAIPIDA

Profesionales

2005

2006

2007

2008

Crecimiento 
2008 / 2007 %

Equivalente 
Miles USD

915,217

1,320,849

1,529,818

1,887,723

894,005

1,188,813

1,439,974

1,827,710

174,599

71,465

32,724

272,755

174,373

104,918

299,027

399,490

207,199

232,985

129,900

147,189

173,611

275,451

286,607

372,696

1,286

1,380

1,705

1,947

600,803

581,703

127,145

74,152

46,846

118,617

23.40

26.93

33.60

12.45

13.31

30.04

14.19

Actividad por Sector

UAIPIDA

Energia y Petróleo

Edificaciones e Industria

Infraestructura

Minería

Tecnología

Otros

GyM

GMP

Larcomar

GMD

GMI

Concar

14%

13%

46%

17%

6%

3%

29.52%

52.45%

3.88%

4.32%

4.96%

4.87%

66

 
UAIPIDA (Miles de Nuevos Soles)

Utilidad Neta (Miles de Nuevos Soles)

372,696

275,451

286,607

147,189

129,900

104,918

173,611

32,724

2005

2006

2007

2008

2005

2006

2007

2008

Profesionales (Número)

Backlog (Cartera de contratos por 
ejecutar) Millones de US$ Dólares

1,947

1,705

1,286

1,380

830

720

592

539

2005

2006

2007

2008

2005

2006

2007

2008

77

Letter to the Shareholders

Dear Shareholders:

It is our pleasure to present the 2008 Annual Report, in which we 
celebrate the 75th anniversary of the founding of our company, which 
finds us in a clear position of leadership in engineering in the country 
and with the best results in our history.

On June 22, 1933, the construction company, GRAMON-

book on the main projects carried out. At the suggestion 

VEL, was founded. It began constructing flagship build-

of  our  editors,  we  decided  upon  the  title  “Peruvians 

ings such as Miraflores City Hall and would soon be in 

Building Peru”.

charge  of  large-scale  projects,  among  which  the  New 

City of Talara stood out. In 1949, a merger with Morris y 

Additionally,  in  relation  with  the  anniversary,  the  ex-

Montero was agreed upon and Graña y Montero was 

pansion of our offices was initiated with the latest tech-

formed in order to have the capacity to undertake large 

nology in order to provide the best working conditions, 

infrastructure  works,  such  as  the  Pan-American  High-

including  a  new  auditorium  and  gymnasium  for  our 

way or the Cuajone mining project. Following the cele-

employees’  professional  development  and  personal 

bration  marking  50  years  of  operations,  a  diversifica-

well-being.

tion  process  was  initiated  in  order  to  include  other 

engineering  activities  that  today  have  led  us  to  com-

Earnings for the year 2008 surpassed those of all pre-

prise a group of 7 companies with 13,012 employees, of 

ceding  years.  The  group’s  activity  exceeded  US$600 

which 1,407 are engineers, which gives us the capacity 

million,  which  means  that  annual  growth  was  23%, 

to  participate  in  the  country’s  major  projects,  such  as 

cash generation amounted to US$119 million, increas-

Camisea,  to  undertake  the  operation  of  2,400  km  of 

ing  30%  in  comparison  to  the  preceding  year,  and  

highways  under  concession  and  to  run  our  own  gas 

net  income  was  US$47  million  (13%  more  than  that  

fractionation plant.

of 

the  preceding  year,  absorbing 

the  currency  

exchange difference).

We are proud of the works executed over these 75 years, 

which have benefited millions of Peruvians. For this rea-

These results have enabled us to make considerable 

son, on the occasion of our anniversary, we presented a 

progress  on  our  investment  plan,  with  over  US$100 

8

José Graña Miró Quesada

million  invested  during  the  year,  mainly  in  the  three 

Canchaque  Highway  and  the  Parques  del  Agustino 

sectors  established  in  our  Strategic  Plan.  The  largest 

project, respectively.

investments  made  in  the  hydrocarbon,  infrastructure  

concession  and  social  housing  sectors  were  in  the  

Talara  Gas  Fractionation  Plant,  the  Buenos  Aires- 

9

Mario Alvarado Pflucker

Nuestros resultados nos han permitido avanzar notablemente 
en nuestro plan de inversiones, habiendo invertido más de US$100 
millones en el año, principalmente en los tres sectores que hemos 
definido en nuestro Plan Estratégico. 

1010

However, the most important achievements attained in 

based  on  a  15%  increase  of  our  portfolio  of  contracts 

2008,  in  consolidation  of  our  long-range  plan,  were 

pending execution, which amount to US$830 million as 

three major contracts in the same three districts. In the 

of December 31.

hydrocarbon  sector,  we  signed  a  concession  contract 

for the Pisco-Lima Gas Pipeline. In infrastructure, work 

We  are  aware  of  the  fact  that  we  have  completed  75 

was begun on the 750 km Nazca-Cuzco highway con-

years of operations primarily due to commitment to our 

cession  and,  in  the  area  of  social  housing  we  were 

values, to our employees and to the communities where 

awarded a contract for the construction of 22,656 homes 

we work. During the year, 182,776 man-hours of train-

in relation with the Nuevo Habitat Comas project.

ing for the development of professional capacities and 

738,143  man-hours  of  training  on  risk  prevention  and 

Considering the great potential demand existing in the 

environmental  management  have  been  completed.  In 

social housing segment in Peru and the leadership at-

the localities where we operate, 71,960 hours of training 

tained by the group in this activity, it was agreed that a 

for the development of job-related skills were provided 

new  company  called  GMV  would  be  founded  for  the 

for the local populations. This program was recognized 

purpose of focusing on the development of social hous-

by IPAE in the year 2008 with the Luis Hochschild award 

ing.  The  new  company’s  operations  are  to  begin  in 

for its contribution to education in the country. 

January 2009 with US$30 million in equity, following a 

spin-off from GyM.

During the year, we agreed to form a not-for-profit civil 

association  called  Espacio  Azul,  which  shall  be  in 

These activities are those that will probably experience 

charge  of  carrying  out  social  responsibility  work  out-

the most growth in the coming year. The international 

side  the  group  and  shall  reinforce  our  commitment  to 

crisis that unfolded in recent months found Peru in an 

the communities where we work and to the country. 

exceptionally good position to weather the storm. With 

growth of over 9%, a fiscal surplus and reserves greater 

In  closing,  we  would  like  to  thank  our  customers  and 

than the debt, once again Peru will likely be the country 

employees  who  have  enabled  us  to  achieve  success 

with the highest growth rate in the Americas in 2009. In 

over these 75 years.

order  to  ensure  this  growth,  the  government  recently 

launched  an  anti-cyclical  policy  primarily  based  on 

construction, housing and infrastructure. Our organiza-

tion  is  well  prepared  for  this  with  properly  structured 

debt and we forecast sound growth for the coming year, 

José Graña Miró Quesada
President

Mario Alvarado Pflucker
General Manager

1111

 
12

PERUVIANS 
BUILDING  
PERU

1933–1948 

1949–1969 

1968 –1982 

1983–1990 

1991–1997

1998–2006 

The early 

years: 

Gramonvel

14

The Beginings of 

El Reto de la  

Diversification

The Stable Cash 

The Efficiency 

Graña y Montero

Segunda  

Flows Strategy

Boost

18

Generación

22

26

30

3

13

(1933–1948)

The early years: Gramonvel

On June 22, 1933, with youthful enthusiasm, Carlos Graña Elizalde, 
Alejandro Graña Garland and Carlos Montero Bernales, who were 
three young Peruvian engineers, agreed to form, in their own words, 
“a technical company with the objective of bringing together our 
knowledge in order to undertake any construction project”.
During the early years, Héctor Velarde Bergman, an architect, joined 
them and the company took the name Gramonvel; that is, Graña, 
Montero and Velarde. 

Years later, Héctor Velarde left Gramonvel to dedicate 

niques. It is because of this that he is recognized as one 

his efforts exclusively to architecture. 

of the creators of the construction business in Peru. Car-

Lima  was  a  city  whose  population  had  grown  to  half  

area of finance, while Alejandro Graña stood out due to 

a  million  inhabitants.  Its  main  hub  was  downtown, 

his technical and management capabilities, especially 

where the recently founded company, Gramonvel, start-

in difficult times and critical situations. 

los  Montero  contributed  his  talent  and  culture  in  the 

ed  its  operations  with  3,000  soles  in  capital.  Its  first  

office  was  on  the  sixth  floor  of  the  Wiese  building  on 

Gramonvel’s first construction project was the residence 

Jirón Carabaya.

of Dr. Manuel Irigoyen y Puente.

Carlos  Graña  was  the  first  president  of  the  company 

This  initial  phase  continued  with  other  construction 

and the creator of the long-term business concept that 

projects as they developed new capacities and took on 

distinguished  it.  He  was  forward-thinking  and  had  a 

new challenges, such as the docks for the guano com-

great  capacity  for  establishing  new  business  tech-

pany. By 1937 the company was carrying out more am-

14

bitious projects, such as the Miraflores beach facilities, 

which had space for up to 500 people. 

The company continued expanding its offering, under-

taking  construction  projects  with  increasing  size  and 

technical difficulty, as occurred with the Nestlé factory 

(1937)

Baños de Miraflores

15

(1933–1948)

in Venezuela, where the latest technical solutions, such 

as rigid tiling were implemented due to the type of soil, 

and the Nestlé plant in Chiclayo, where a flexible tiling 

solution was designed for the same reason. In the case 

of  the  Copsa  factory  in  Callao,  50-meter  high  stacks 

were  built  according  to  procedures  designed  entirely 

by the company. 

In  1941,  the  eminent  planning  engineer,  Teodoro  E. 

Harmsen, joined the company. He excelled as the tech-

nical  and  administrative  manager  and  eventually  be-

came the managing director and president of the GyM 

board of directors. 

In 1942, Luis Graña, who had worked on the construc-

tion of the Panama Canal, joined Gramonvel. For many 

years, he held the position of Works Manager and Di-

rector at GyM. Due to his technical skill and personal 

characteristics, he became a role model for other engi-

neers who had the opportunity to work with him. 

Fábrica Copsa

Vista de la fábrica Copsa, 
Callao (1948)

In 1942, Gramonvel built the Nestlé factory in Venezue-

la, its first project abroad, with Enrique Olazábal as the 

resident  engineer.  That  same  year,  the  company  was 

awarded the contract for the El Pato Base in Talara for 

the United States government. In order to carry out this 

project, the contribution of Morris y Montero, a company 

owned by a cousin, Jorge Montero Muelle, was required 

in  addition  to  that  of  the  entire  Gramonvel  staff.  As  a 

result of this project, a successful association began.

Because  of  its  good  performance,  the  company  was 

able  to  continue  working  in  the  area  where,  together 

with Roque Vargas Prada y Cía., we obtained the con-

tract for the construction of the entire city of Talara in 

Fábrica Nestlé

1945. There we built over 2,000 houses, offices, schools, 

Chiclayo (1943)

markets,  churches  and  commercial  properties  for  the 

IPC,  as  well  as  the  refinery  and  another  airport.  Luis 

Noriega was the resident engineer for this major con-

struction project. 

By 1949, Gramonvel’s partners had decided to merge with 

Morris y Montero, giving rise to Graña y Montero S.A.

16

Personal de 
Gramonvel

En sus oficinas del edificio 

Wiese (1942)

17

(1949 –1967)

The Beginnings of Graña y Montero

On October 31, 1949, Gramonvel and Morris y Montero agreed to 
merge and create Graña y Montero S.A., under the presidency of 
Carlos Graña Elizalde, with Alejandro Graña Garland, Carlos Montero 
Bernales, Jorge Montero Muelle and Dr. Roy Morris, who was later 
replaced by Dr. Manuel Echecopar, as directors.

The engineer Jorge Montero joined the firm, contributing 

Meanwhile,  GyM  relocated  to  offices  in  the  Ostolaza 

his knowledge in construction equipment management 

building  located  at  the  corner  of  Avenida  Tacna  and 

and creating GyM’s Equipment Leasing Table System. 

Jirón  Huancavelica.  The  company’s  development  con-

Following the creation of GyM, individual contributions 

construction projects that served to increase its techni-

tinued  from  1949  onward  as  it  undertook  important  

were  important,  such  as  Jorge  Montero’s  equipment 

cal capacities. 

management, the “school” created by Luis Graña, who 

was  a  master  of  construction,  and  Teodoro  E.  Harms-

One of these projects was the expansion of the Oeschle 

en’s ability in the technical office. A culture was devel-

store  in  1950,  which  constituted  a  special  technical 

oping with the principal value of “reliability”, including 

challenge,  as  a  basement  was  built  without  interrupt-

quality,  performance  and  ethics.  It  would  continue  to 

ing the store’s regular operations. The work of securing 

develop, as the current culture contains the past, as the 

the building — sustaining it in order to lay the founda-

future culture will contain the present. 

tion — and building a basement required special tech-

nical underpinning procedures designed by Teodoro E. 

18

Aeropuerto Jorge 
Chávez

(1960)

Luis y Alejandro 
Graña

Luego de un vuelo en el 

avión de la empresa (1953)

Harmsen, under the supervision of Carlos Graña, with 

airplane  that  was  used  to  visit  its  distant  construction 

Carlos Cava Crovetto as the resident engineer. 

projects, such as the Southern Pan American Highway 

In  1952,  for  the  construction  of  the  Hospital  del  Em-

or the city of Talara.

pleado  (now  Hospital  Edgardo  Rebagliati  Martins), 

Upon Carlos Graña’s death, Fernando Graña assumed 

GyM worked with Flores y Costa S.A. and Andes Con-

the presidency and held the position until 1957, when 

structora  to  form  an  engineering  consortium  called 

Alejandro  Graña  was  elected  president,  with  Carlos 

Consorcio  de  Ingenieros  Contratistas.  Subsequently, 

Montero  Bernales,  Jorge  Montero  Muelle,  Luis  Graña 

the consortium participated in major construction proj-

Garland and Teodoro E. Harmsen as directors.

ects in Peru and expanded its operations to Argentina, 

Bolivia and Chile.

Alejandro Graña held the position until 1983, when he 

retired  upon  GyM’s  50th  anniversary  and  was  named 

In 1953, Carlos Graña died in a tragic accident when 

honorary president. 

traveling  in  the  company’s  twin-engine  Boeing  247  D 

19

(1949 –1967)

Sears Roebuck 
del Perú

Vista de la obra terminada y 
en funcionamiento (1954)

In  relation  with  the  construction  of  the  social  security 

system’s Hospital del Empleado, our firm joined forces 

with two other Peruvian companies to form an engineer-

ing  consortium  called  Ingenieros  Contratistas  Gener-

ales in 1952.

As a member of the consortium, we participated in the 

country’s major construction projects, such as the steel 

plant  in  Chimbote,  the  Cañón  del  Pato  Hydroelectric 

Plant and the Jorge Chávez International Airport. As a 

result of this experience and the reputation we acquired 

with these complex construction projects, we were able 

to  undertake  important  works  abroad,  such  as  the  El 

Alto  Airport  in  La  Paz,  Bolivia,  and  the  Nihuil  Dam  in 

GyM continues undertaking major construction projects 

for both the public and private sector, while developing 

knowledge  about  buildings  and  infrastructure  works. 

As  an  anecdote,  and  moreover  as  a  challenge,  we 

Mendoza, Argentina.

should remember engineer Luis Graña’s statement that 

GyM  was  capable  of  completing  a  kilometer  of  high-

way per day. 

Following  completion  of  the  Talara  works,  in  1957  the 

engineer Juan Madalengoitia was placed in charge of 

opening an office in Piura, from where work on the con-

struction of the Santa Teresita (Copsa) cotton gin plant 

was  initiated.  Upon  its  completion,  it  was  the  largest 

plant of its kind in the world.

In 1965, the engineer Carlos Montero Graña joined the 

firm, starting in the position of resident engineer, subse-

quently  becoming  the  Equipment  Division  manager 

and eventually assuming the position of general man-

ager, which he held from 1986 to 1990. Currently, he is 

the vice president of the group.

20

Hospital del Empleado

Presidente Manuel A. Odría 

visita las obras

21

(1968 –1982)

El Reto de la Segunda Generación

En 1968 eran momentos difíciles para la empresa, pues se estaba 
liquidando el Consorcio de Ingenieros Contratistas debido a la mala 
experiencia de las obras en Argentina y Bolivia. 

En el país también eran épocas difíciles. Se produjo el 

ción presupuestos de día y en las noches tomar un curso 

golpe militar del general Juan Velasco contra el arqui-

de administración para graduados.

tecto  Fernando  Belaunde  luego  de  una  devaluación 

traumática y, poco después, se expropió la International 

Había  descubierto  que  las  empresas  no  se  heredan, 

Petroleum y las haciendas azucareras, que se encontra-

sino se trabajan y había aceptado el reto de la segun-

ban entre nuestros clientes.

da generación.

José Graña se encontraba en Londres después de haber 

Así empezó lo que podríamos llamar la etapa de tran-

terminado la carrera de arquitectura, cuando recibió la 

sición  o  de  cambio  generacional.  Porque  no  estaba 

noticia de que debía regresar a Lima y empezar a traba-

solo. Éran cinco socios o familias de socios y más de 

jar en GyM. 

cien empleados e ingenieros. 

Aprendió su primera lección empresarial tuvo que tomar 

Este  proceso  de  trabajo  simultáneo,  que  en  nuestro 

su  primera  decisión.  Olvidar  sus  sueños  juveniles  de 

caso duró diez años, es probablemente la época más 

emular a Le Corbousier y comenzar a trabajar en la sec-

interesante y delicada cuando hablamos del tema del 

22

cambio de generaciones en una empresa.

Creo  en  esa  etapa  la  palabra  clave:  respeto.  Respeto 

por las personas, respeto por los socios, respeto por las 

tradiciones,  respeto  por  la  historia,  respeto  por  los  va-

lores de la empresa.

 Alejandro y José Graña

El cambio generacional 

fue un proceso de trabajo 

simultaneo que llevó 10 años

23

(1968 –1982)

The strategy of keeping the GyM operation independent 

Subsequently, in 1975, in line with this new philosophy, 

and parallel to the consortium’s work enabled us to pull 

the  Campoverde  Consultores  organizational  develop-

through the crisis. In the two following years, contracts 

ment firm was hired with the initial participation of José 

on important projects such as the Banco Central Hipote-

Campoverde and, starting in 1983, that of Ricardo Ruzo 

cario bank, the Cementos Lima cement plant, the works 

to develop the GyM management cadres and to work on 

in Quiruvilca for Northern Peru and the Sheraton Hotel in 

two central themes: management by objectives and the 

Lima were obtained. 

search for excellence. 

Inspired by José Graña, in 1969 a brochure was prepared 

As part of this work, a survey was conducted among our 

in relation with the major works completed by GyM from 

customers and suppliers, which confirmed that we were 

1933 to 1969, which increased recognition of the elder, by 

known not only for performance and quality, but also for 

keeping the company’s values alive. This attitude served 

reliability as a distinctive value of GyM. In 1977 Graña y 

that generation well as it spontaneously began to dele-

Montero opened its new offices on block 46 of Avenida 

gate functions to the next generation. 

Paseo de la República in the Surquillo district. 

Graña y Montero obtained the contract for earth moving 

In  1975,  Jorge  Montero  had  died  and  in  1979,  Carlos 

works, civil construction and plants at the Cuajone mine, 

Montero and Luis Graña passed away. 

as well as the contract for the construction of the central 

bank, Banco Central de Reserva. These works reaffirmed 

During  this  phase,  new  professionals  arrived  at  GyM, 

its leadership in the construction industry. 

such as Rodolfo Sotelo, who is now the manager of the 

Fábrica de Cementos 
Lima

(1969 –1970)

Budget area; Octavio Cabrera, the current manager of 

the Civil Works division; Hernando Graña, who was the 

manager  of  the  Commercial  and  Development  areas 

and is now the executive vice president of GyM, and Juan 

Manuel Lambarri, the current general manager.

24

Hotel Sheraton

Detalle de su construcción 

(1972–1974)

Banco Continental

Construcción del Banco 

Continental y Centro 

Comercial San Isidro 

(1978–1980)

Other professionals who joined the firm include Francis-

co Dulanto, who began working in the Technical Section 

and is now the general manager of GMP; Walter Silva 

Santisteban, the current general manager of GMI, and 

Mario Alvarado Pflucker, who was the general manager 

of GME and later became the general manager of Gra-

ña y Montero S.A.A.

In 1983, Graña y Montero celebrated its 50th anniversary 

and, as a result of the successful process of incorporat-

ing the second generation, was prepared to begin a new 

phase of development and change. 

Mina Cuajone

Tajo abierto (1976)

25

(1983 –1990)

Diversification

In 1983, Graña y Montero celebrated its 50th anniversary with 
President Fernando Belaunde in attendance at the ceremony at  
its offices.
Due to the effects of national or worldwide matters, construction 
cycles limited our growth, so as a response, the need to diversify 
within the field of “engineering services” was recognized.

It was decided that a diversification process that would 

sequently,  in  1988,  it  was  hired  by  the  Chimú  consor-

change the company had to be initiated. Growing and 

tium  to  undertake  the  detail  engineering  for  the 

diversifying became the new challenge. 

Chavimochic irrigation project. 

GMP began its operations providing services to Petrope-

In August of 1984, the first company within the diversifi-

ru for the operation of oil wells and for the drilling of the 

cation process was formed: GMI-Graña y Montero Ing-

same wells by companies established in the area, such 

eniería, which was dedicated to consulting and super-

as Sapet, Unipetro and Monterrico.

vision,  with  the  engineer  Luis  Noriega  as  the  general 

manager. GMP-Graña y Montero Petrolera, which was 

In  June  of  1985,  GMD-Graña  y  Montero  Digital  was 

dedicated to petroleum production services, followed in 

founded  to  provide  information  engineering  services, 

November of the same year, with the engineer Francisco 

as the result of a partnership with the Chilean company 

Dulanto as its general manager.

Sonda  and  with  the  Digital  Equipment  Corporation 

GMI began its operations with the design of the expan-

dealership. The engineer Enrique Zevallos was its first 

sion of the Pacocha industrial plant in Huacho and sub-

general  manager.  Subsequently,  GMD  acquired  Son-

26

Unidad de 
Bombeo GMP

Piura

27

(1983 –1990)

da’s share, thus developing independently. 

headed by engineer Juan Manuel Lambarri, was found-

Since  May  of  2000,  Jaime  Dasso,  an  engineer  who 

ed to execute construction projects related to buildings 

joined GMD, has been its general manager. 

in the capital.

In  the  decade  of  the  eighties,  GMD’s  business  was 

From  1984  to  1987,  GyM  continued  working  actively 

based on the sale of hardware and software products 

throughout Peruvian territory, affirming its leadership in 

and services. Its first clients were companies with DEC 

construction  projects  related  to  buildings  and  infra-

(Digital  Equipment  Corporation)  installed  base,  and 

structure.  During  those  years,  new  engineers  who  are 

IBM  installed  base  later  on.  Its  main  customers  were 

now project managers, such as César Vera, Javier Soto 

Minero Peru, the Ministry of Agriculture, the Ministry of 

and Mario Rangel, joined the company. 

Transportation and Communication, the Peruvian navy, 

the Lima Stock Exchange, Inti Corredores de Seguros 

In  1988,  GyM,  together  with  the  Norberto  Odebrecht 

insurance  brokers,  Empresa  Nacional  de  Comercial-

construction company, began work on the Chavimochic 

ización  de  Insumos  (ENCI/National  Company  for  the 

project in Trujillo. 

Commercialization  of  Agricultural  Inputs),  Drokasa 

and the International Potato Center.

In 1985, as President Belaunde’s term was drawing to a 

close,  management  decided  to  expand  our  financial 

In  January  of  1987,  GME-Graña  y  Montero  Edifica-

forecast from 5 to 10 years, in order to avoid the effect of 

ciones, which was dedicated to real estate promotion, 

thinking  of  a  single  presidential  term.  When  defining 

management  and  investment,  was  founded  together 

our objectives at that time, among others, international-

with Mario Alvarado Ballón and a short time afterward, 

ization  and  the  attainment  of  what  we  called  a  large 

in  September  of  1988,  GML-Graña  y  Montero  Lima, 

project were established. 

Fiesta de los 50 años 
de GyM

In  this  forecast,  Chavimochic  was  considered  to  have 

potential as that large project and we had to dedicate 

Alejandro Graña, José 

Graña y Fernando Belaunde

our efforts to obtaining it, establishing competitive ad-

vantages, which was achieved with the contract award 

for  the  construction  of  the  provisional  bridge  for  that  

irrigation  project,  as  well  as  a  proper  decision  on  

the  firm  with  which  we  would  partner.  Years  later,  we 

joined forces with Odebrecht on this large project that 

28

Muelle Conchán 
para Cementos Lima

Baterías de petroleo 
para Occidental 
Peruana

(1987–1989)

GMP (1983–1989)

enabled us to weather critical times for the country with-

of electromechanical assembly for our company, which 

out major problems. 

had been known traditionally as a general contractor 

In  1990,  together  with  France’s  Cegelec  (Alsthom), 

for civil works. 

SOPEN,  a  company  dedicated  to  electromechanical 

In October of 1990, Holding Graña y Montero was cre-

assembly, was created under Cegelec’s leadership and 

ated, initially as GMH and subsequently the construc-

management  initially.  Subsequently,  in  1992  the  part-

tion  company  gave  its  name  to  the  holding  company, 

nership was redefined, GMA was created and Graña y 

which  then  became  known  as  Graña  y  Montero  S.A. 

Montero assumed an increasing share percentage until 

The construction company changed its name to GyM. 

it reached 100%.

The  architect  José  Graña  was  named  manager  of  the 

holding  company  and  the  engineer  Luis  Díaz  Imiela 

The  engineer  Luis  Vinatea,  who  had  been  the  opera-

Gentimur was the general manager of GyM. 

tions manager at SOPEN, became the general manag-

er of GMA. This company opened the doors to the world 

The basic phase of diversification had been completed.

29

(1991–1997)

The Stable Cash Flows Strategy

During these years, Graña y Montero defined the strategy  
of directing its commercial attention toward contracts that generate 
stable cash flows for the company, as these triggered the company’s 
economic stability.

In  virtue  of  this,  the  companies’  commercial  strategy 

Concesiones de Carreteras S.A. was formed for this pur-

was  redesigned  and  subsequently,  the  company  par-

pose,  giving  rise  to a  specialty that  would result  in the 

ticipated  in  the  privatization  process,  becoming  the 

existence of our current company, Concar S.A.

Peruvian  partner  of  companies  such  as  Telefónica, 

Edegel  and  Repsol.  The  relations  established  in  the 

In October of that year, GyM joined forces with Sintel of 

privatization  process  would  later  result  in  important 

Spain and Telefónica Internacional to form Sintel Peru, 

projects for GyM, such as laying the Lima-Arequipa fi-

in order to provide internal and external plant services 

ber optics or the Yanango Hydroelectric Station. Addi-

during  the  development  phase  of  telephone  service  in 

tionally,  GMD  consolidated  contracts  with  Telefónica, 

Peru.  Fernando  Almenara  was  subsequently  named 

such as the Omega contract in 1991, which was an im-

manager of Sintel.

portant milestone.

In 1994, the first road concession contract was signed for 

lished  a  complementary  internationalization  strategy. 

the  operation  of  the  Arequipa-Matarani  highway  and 

Following  analysis  of  different  regional  possibilities,  it 

The diversification process progressed and GyM estab-

30

Concesión de 
Carretera IIRSA

Concar

Concesión de Termi-
nal de combustible 
de Mollendo

GMP

was  decided  that  an  office  would  be  opened  and  con-

Plásticos  Omnium,  with  its  Puebla  and  Ramos  Arispe 

struction work would be carried out in Mexico. 

plants, as well as the buildings built for GME, which also 

started up operations in Mexico.

Back  in  the  early  nineties,  the  company  made  its  en-

trance in the Mexican market with the contract for build-

In  those  years,  the  GyM  projects  increased  in  impor-

ing the Four Seasons Hotel, which was followed by the 

tance,  such  as  the  contract  for  the  construction  of  the 

Plaza and Pasaje Santa Fé real estate projects. Initially, 

United States Embassy in Lima, in a joint venture with 

the projects were carried out with EPN and Constructora 

J.A. Jones; the Hotel Oro Verde, which is now the Swis-

ROCA. Subsequently, Graña y Montero S.A. de CV was 

sotel in San Isidro or the expansion of the Sheraton Ho-

founded and became well known to the competition. 

tel in Santiago, Chile. A specialization in transmission 

Among  its  customers  are  the  Church  of  Jesus  Christ  of 

ra line and continued successfully. The company’s min-

the  Latter  Day  Saints,  for  whom  we  built  two  churches 

ing work received a boost with the work performed on 

and  twenty-five  cultural  centers  in  different  cities,  and 

the Pierina mine in Huaraz and Yanacocha Stage 5 in 

lines was developed, beginning with the Chiclayo-Piu-

31

(1991–1997)

Embajada de los 
Estados Unidos

Lima (1992–1995)

Hotel Four Seasons

México (1992–1994)

Cajamarca. The first maintenance services for the net-

GMD focused its business on software development and 

works of Sedapal, the state water company, were pro-

obtained  contracts  with  Sunat,  Telefónica,  Copresa, 

vided as well. 

IPSS, BellSouth, AFP Unión Vida and the Lima Stock Ex-

change, for which it designed an electronic negotiation 

Early in the decade, GMI began its operations abroad 

system (ELEX), which is still in use.

when  a  contract  was  signed  for  the  supervision  of  

the  Hotel  Meliá  Bávaro  in  the  Dominican  Republic,  

In 1994, a set of company policies, such as “Before the 

with  which  a  long  relationship  with  the  Meliá  group  

Deadline”, “Quality of Service” and “Customer-Partner”, 

was established.

were devised in order to guarantee follow-up on our es-

sential values: Performance, Quality and Reliability. 

Meanwhile, GMP was awarded exploration and drilling 

contracts for Lots 1 and 5 in Talara in calls for tenders 

In order to specify the value of Performance, the “Before 

related  to  petroleum  exploration  areas  promoted  by  

the  Deadline”  policy  was  established.  However,  it  was 

the government. 

noted that any company could say that it met its dead-

32

lines; therefore it was of utmost importance not only to 

say it, but to demonstrate it. Consequently, it was decid-

ed  that  Price  Waterhouse  would  be  hired  to  measure 

compliance with our contracts and establish an annual 

compliance percentage. 

Since  that  time,  we  have  been  able  to  demonstrate  a 

compliance  level  of  over  99%,  reaffirming  our  commit-

ment to the policy. 

The  implementation  of  the  Customer-Partner  policy, 

which sets out a high-level meeting with the owners and 

supervision  in  order  to  establish  direct,  timely  lines  of 

communication and to align the companies’ objectives to 

benefit  the  project,  has  yielded  good  results  from  the 

start. In the Lima-Arequipa fiber optics, Hotel Oro Verde 

Túnel Kovire

and  many  other  projects,  it  was  demonstrated  that  the 

Tacna (1990–1995)

benefits of this policy of aligning expectations were very 

significant. In 1994, Graña y Montero was recognized as 

In 1996, Holding Graña y Montero S.A. was reorganized 

a national leader in organizational change processes. 

and  the  engineer  Mario  Alvarado  was  named  general 

The year 1995 was marked by two occurrences. At the 

manager. 

beginning of the year, on January 6, Alejandro Graña, 

In  mid  1997  Graña  y  Montero  was  the  first  company  

the  last  surviving  member  of  the  founders  of  Graña  

in  the  sector  to  have  its  shares  quoted  on  the  Lima  

y  Montero,  passed  away  and  toward  the  end  of  that 

Stock Exchange.

year, the group’s “Letter of ethics” was published to for-

malize our commitment to our customers, partners, em-

ployees and the community regarding our fundamental 

value, Reliability. 

33

(1998– 2006)

The Efficiency Boost

The Graña y Montero group is an open company quoted on  
the Lima Stock Exchange and recognized as one of the country’s 
leading companies. The group’s prestige has been reinforced  
by specific policies to ensure respect for its traditional values of 
Quality, Performance, Reliability and Efficiency. 

The second generation’s strategies have been: 

provided, the decision was made to publish the risk pre-

1)  Professionalism,  team  work  and  respect  for  knowl-

vention policy designed to communicate our firm posi-

edge  within  a  new  work  philosophy,  2)  diversification 

tion in this regard to the managers, employees, subcon-

and  internationalization  to  absorb  the  impact  of  the 

tractors and customers and, at the same time, to assist 

country’s construction cycles, and 3) the generation of 

the managers in the fulfillment of their responsibility to 

stable  cash  flows,  participating  in  privatizations  and 

provide safe working conditions for their employees.

concessions and expanding our activity within the field 

of engineering services in search of economic stability.

In 1998, GMP began operations related to the conces-

In 1998, it was decided that the company’s environmen-

called GMT-Consorcio Terminales with Oil Tanking of 

tal  policy  should  be  made  known  with  a  document  to 

Germany. At a later date, in 2000, this consortium ac-

formalize  its  commitment.  Subsequently,  in  order  to 

quired the CLHB company to run the fuel storage and 

show that risk prevention had priority within the plan for 

transportation business in Bolivia.

sion  contract  on  fuel  terminals,  forming  a  consortium 

technological  progress  and  excellence  in  the  services 

34

That  same  year,  within  its  quality  assurance  strategy, 

GMD  obtained  ISO  9001  certification  in  maintenance 

and post-sale service.

In  1999,  the  Corporate  Learning  Center  (known  by  its 

Spanish  acronym,  CCA)  was  created  as  an  entity  for 

the development, acquisition, updating and sharing of 

knowledge. 

That year, together with the Spanish company, Necso, 

GyM  obtained  the  contract  for  the  bypass  tunnel  and 

the cavern for the Ralco hydroelectric plant in Chile for 

Endesa, as well as the initial works for the development 

of the Antamina mine in Huaraz. 

Túnel de Derivación

Central Hidroeléctrica de 
Ralco en Chile (2002–2004)

35

(1998– 2006)

Carretera 
Interoceánica IIRSA 
Norte

(2006–2031)

Economic stabilization and the opening of the market 

In December of 2000, GML merged with GyM and be-

in  the  nineties  obligated  us  to  meet  international  effi-

came the Building Division headed by the engineer Julio 

ciency standards so as to be competitive. In 1999, GyM 

de la Piedra. The engineer Juan Manuel Lambarri be-

decided to initiate the “MP21” Efficiency Improvement 

came the general manager of GyM, replacing Luis Díaz 

Project with advisory services from two important con-

Imiela Gentimur, who took on the role of executive direc-

sulting  firms.  The  processes  defined  for  this  project 

tor and took charge of the Corporate Learning Center. 

were implemented in the year 2000.

Simultaneously,  with  assistance  from  external  consul-

and  stable  cash  flows,  GMI  redesigned  its  manner  of 

tants, GMD worked on a process revision program for 

serving  companies  and  obtained  a  framework  engi-

the purpose of improving its efficiency.

neering contract with BHP Billiton Tintaya, which would 

In 2000, within the plan to generate long-term contracts 

be  replicated  with  Antamina,  Cerro  Verde,  Río  Tinto, 

Repsol and Pluspetrol

36

Fundición Ilo

Nave de Convertidores

(2005-2006)

37

The decade beginning in the year 2000 has been a pe-

ing out its operations as the target group on the exter-

riod of continuous development for GMD, which began 

nal  front.  Early  in  2006,  the  Graña  y  Montero  Group 

performing technology outsourcing work for companies 

formed  part  of  the  consortiums  awarded  the  conces-

such as Alicorp, Ebel and San Fernando, subsequently 

sions for 950 kilometers of the Northern IIRSA highways 

developing  outsourcing  of  the  business  itself  for  the 

and two sections of the Southern IIRSA extending 700 

ONP, OYR and municipal and regional elections. 

kilometers, where we shall participate in the construc-

GME merged with GyM, hence the GyM production or-

tained the contract for the operation and maintenance 

tion  of  those  highways.  Additionally,  Concar  S.A.  ob-

ganization  has  four  divisions  now:  Real  Estate,  Build-

of the Northern IIRSA. 

ings, Civil Works and Electromechanics. 

In April of that year, GMP acquired the Talara gas pro-

GMI initiated an engineering project in relation with a 

cessing  plant  from  the  electric  company  in  Piura.  To-

gold industrial plant for Minera San José in Argentina. 

ward the end of the year, Graña y Montero obtained the 

Within  this  process  of  development  and  consolidation 

concession  for  the  Buenos  Aires-Canchaque  highway 

of its corporate identity, supported by its adherence to 

in the department of Piura, where once the construction 

standards of good corporate governance and comple-

has been completed, Concar S.A. shall be in charge of 

menting its letter of ethics and its policies on risk pre-

the  operation  of  this  road.  In  2007,  the  concession  for 

vention  and  the  environment,  a  social  responsibility 

the 750-kilometer section 1 of the Interoceanic Highway 

policy  is  formalized,  having  its  personnel  and  share-

was obtained. 

holders  as  the  primary  target  group  on  the  internal 

front, and the community with which it is linked in carry-

In 2006 the highlights for GyM were the contracts on lot 

Central Térmica 
de Malacas

Talara (1997)

1 AB in Andoas and lot 8 for Plus Petrol, where we have 

been operating 23 years. 

In 2007, the GyM real estate division was awarded the 

contract for the first megaproject of the Mivivienda pro-

gram called Los Parques de El Agustino, which shall be 

the model for future social housing programs in Peru.

38

During 2008, work was completed on the installation of 

the Talara gas plant, work began on the construction of 

the Westin Libertador Hotel in San Isidro and, lastly, a 

contract was signed in relation with the construction of 

the  Nuevo  Habitat  complex  in  Comas,  where  22,656 

housing units are to be built.

The 2007–2011 Strategic Plan can be summed up into 

three objectives: 1) to generate value within the Group 

through investment in new projects, reinvesting a large 

percentage of the profits, 2) to attain structural stability 

of the Group using the new investments to consolidate 

our position in the sectors corresponding to the pillars 

of the corporation, which are hydrocarbons, infrastruc-

ture  and  construction  and  3)  to  increase  our  prestige 

and capacities, taking adherence to our values to the 

highest  international  standards  and  making  great  ef-

fort  in  the  area  of  knowledge  management,  building 

capacities  among  the  group’s  professionals  and  pro-

viding them with the infrastructure and resources they 

need to ensure their development.

To date, the new strategy has shown results reflected 

in  the  value  attained  by  the  company  on  the  Lima 

Stock Exchange.

39

40

STRATEGIC 
DEVELOPMENT

Diversification

Concessions

Strategic Investments

44

46

48

41

42

43

Diversification

Over 20 years ago, we adopted a diversification strategy in order  
to increase the stability of our business without distancing ourselves 
from our basic knowledge; so we focused our efforts on turning  
the company into an Engineering and Infrastructure Services Group. 
Today, what was once a construction company has become a group 
of 19 companies grouped in 6 companies, thereby achieving the 
objective of having the new companies generate over half of the 
Group’s operating profits. 

GMD,  the  Information  Technology  Services  company  that 

GMI, the Engineering Consulting company that has a 

has a Technological Operations Center for outsourcing sys-

subsidiary specializing in Environmental Engineering called 

tems services 

ECOTEC

44

GMP, the Petroleum Services company that drills oil wells 

GyM, the original construction company, which has four 

for third parties, operates two petroleum fields in northern 

divisions: Electromechanics, Civil Works, Buildings and 

Peru, operates a Natural Gas Fractionation Plant in Talara 

Real Estate 

and has formed Consorcio Terminales, a consortium with 

Oiltanking of Germany for the operation of fuel terminals 

in Peru

CONCAR, the company specializing in the operation and 

LARCOMAR, (Fashion Center S.A.) the company that oper-

maintenance of highways under concession 

ates Larcomar Entertainment Center and Fashion Mall in 

the district of Miraflores 

45

Concessions

In recent years we have been successful in attaining our objective 
of ensuring the stability of the Group by developing knowledge 
and skills in design, construction, finance and the operation of 
Infrastructure Concessions, which is clearly the way that large 
projects will be carried out in the future. 

The Builder-Concessionaire model generates extensive synergies 
among the Group’s different lines of business. In the economic 
aspect, concession cycles are long-term, sometimes 60 years, 
in comparison with 1 or 2 years for construction contracts. 
Concessions produce very stable margins, although they are capital 
intensive, while construction companies require less capital and 
generate cash flow. In operations, the two areas strengthen and 
complement each other in execution and maintenance work. 

Currently, we own shares in the concession companies listed below.

46

Norvial
Red vial 5 – Ancón, Huacho, 

Pativilca

Consorcio Terminales
Terminal de combustible 

en Mollendo

Survial
Carretera Interoceánica 

Cuzco – Nazca

Fashion Center de Larcomar

CONCAR

Consorcio Terminales

Fashion Center S.A.

Operator of the Norvial Concession for the 

Joint Venture with Oiltanking of Germany 

Concessionaire of the Larcomar 

North Lima Highway to Pativilca, CONCIN 

to operate fuel storage terminals in Peru, 

Entertainment Center and Fashion 

for the Northern IIRSA Highway from Paita 

the Camisea Loading Dock in Pisco, and 

Center in Miraflores

to Yurimaguas, and Survial for the Nazca-

NaSH Storage and Dispatch facilities at 

Cuzco Highway (Section 1 of the Peru-

the Matarani Port 

Brazil Southern Interoceanic Highway) 

TGP 

Norvial

Concesionaria IIRSA Norte S.A.

(Transportadora de Gas del Peru),  

Concessionaire for Road Network No. 5, 

A company that has the concession 

the company that was awarded the 

the Northern Lima highway from Ancón 

contract for the 980 Km Paita -Yurimaguas 

contract for the construction of a 

to Pativilca

Highway 

transportation and distribution system  

for gas from Camisea

CONIRSA

Concesión Canchaque

Survial

A company that is currently building the 

The concessionaire for the Buenos 

The company that toward the end of 2007 

2nd and 3rd sections of the Interoceanic 

Aires-Canchaque Highway, construction 

won the concession contract for the 750 

Highway to Brazil 

of which began in May of 2008 

km first phase of the Interoceanic Highway 

between Cuzco and Nazca. The reha-

bilitation work on this highway began in 

October of 2008.

47

Strategic Investments

In the year 2007, we prepared a Strategic Plan to concentrate our 
long-term investments on 3 pillars of development: Infrastructure 
Concessions, the Hydrocarbon Sector and Social Housing.  
We have been very successful in this program and in the last two 
years we have invested nearly 200 million dollars.

In terms of Infrastructure Concessions, in 2007 we obtained the 
concession for the Buenos Aires-Canchaque highway and in 2008 
section 1 of the Interoceanic Highway from Nazca to Cuzco. In 
addition, we recently agreed to increase our share in NORVIAL,  
the company that has the concession for the highway that runs  
from the north of Lima to Pativilca.

In the Hydrocarbon sector, we have completed the construction  
of the Gas Fractionation Plant in Talara and during the year we have 
obtained the contract for the construction of the Pisco-Lurín multi-
purpose pipeline to be built starting in 2009.

48

Planta de Fraccionamiento 

Conjunto Residencial

Concesión carretera 

de Gas de GMP
Pariñas – Talara

Los Parques del Agustino

Interoceánica tramo 1
Nazca – Cuzco

In the Social Housing Sector, we are executing the Los Parques  
del Agustino housing project and in 2008 we obtained the contract 
for the Nuevo Hábitat Comas housing project. In order to carry  
out these and other housing projects, we decided to form GMV,  
a company starting out with clear leadership in the Social Housing 
Sector in Peru.

49

50

ORGANIZATION

GMD

54

GMI

58

GMP

64

GyM

68

Concar

74

Larcomar

78

51

52

53

Tecnology Services

Centro de Operaciones Tecnológicas de GMD

54

Gerente General

Jaime Dasso Botto

24 Años de GMD 

1983
Plataforma de la Bolsa de Valores 

de Lima

In the year 2008 GMD, which will soon be celebrating its 25th anniversary, consoli-

dated its leading position as a provider of information technology solutions for the 

corporate market by increasing its share of the Software Factory business and Busi-

ness Process Outsourcing (BPO).

The company’s total activity for the year amounted to US$ 36.6 million, which repre-

sents growth of 19.81% over the year 2007. Operating earnings for the year were US$ 

2.3 million and EBITDA amounted to US$ 5.1 million, which indicates 110% and 44% 

growth respectively over the previous year. 

The strategy of focusing on business with stable cash flows has enabled us to con-

solidate our leading position in the Peruvian market and lay the foundation for solid, 

sure growth. The income from Outsourcing and Software Factory business amounted 

to US$ 21 million, which accounts for 56.3% of the total activity.

GMD’s financial results for the year 2008 were quite favorable. The company’s debt 

was reduced by US$ 0.8 million dollars, cash in banks increased by US$ 1.2 million 

dollars and US$ 2.6 million were invested in new outsourcing projects and the expan-

sion and technological renovation of our Data Centers. Today our Data Centers have 

twice the capacity they used to have, with world-class tools and security systems. 

The investment we made in the year 2006 in CMMI level 3 certification for Software 

Factory, aimed at guaranteeing the quality of the development and maintenance of 

GMD Software, has enabled us to be the first information technology company in 

Peru to meet this international standard. By the same token, the strategy of creating 

the Project Management Office in order to standardize processes and methodology 

in all of the company’s projects enabled us to raise the management level and trans-

fer methodologies among them. 

1998
Diseño e implementación 

para los sistemas de cómputo 

de Cavali

55

Principales Cifras

In addition, our strategic partners once again recognized us with their highest distinctions. Cisco recognized us 

at the regional level with the “Cisco Excellence in Customer Satisfaction” award, which is one of the most pres-

tigious awards that a strategic partner can receive. HP granted GMD Platinum Business Partner certification, 

the highest level of certification that the transnational company grants to its business partners. 

Undoubtedly, the main reason we have attained these achievements has been team work among our employ-

ees. The human resource management of our leaders was aimed at building trust and cooperation among the 

support and project areas in commercial and pre-sale processes, as well as in the execution and support. Part 

of this plan was to launch the educational program in project management with courses such as Finance for 

Non-Financial  Personnel,  Contract  Administration,  PMBOK  and  workshops  to  prepare  for  PMP  certification, 

which six new employees obtained. 

Listed below, the main projects which GMD has worked on during 2008.

Industry and 
Sector Industria y 
Commerce Sector
Comercio

Graña y Montero Group
Grupo Graña y Montero

Production start-up of the 
Puesta en producción del Sis-

Corporate Human Resources 
tema Corporativo de Recursos 

nacional, Outsourcing del Pro-
Repsol
ceso de atención y control de 
Outsourcing of the billing and 
despacho de combustible.
collection process nationwide, 

Governmental Sector
Sector Gobierno

Backus
Backus

System (META 4)
Humanos (META 4).

as well as outsourcing of the 

ONP
ONP

Outsourcing of Network Equi-
Outsourcing de Tecnología 

pment and Telemarketing Call 
de equipos de Red y del 

Avícola San Fernando
Avícola San Fernando

Center Technology, Technical 
Call Center de Televentas, 

Renewal and extension of 
Renovación y Ampliación del 

and Functional Evaluation of 
Evaluación Técnica y Funcional 

the Systems Maintenance 
Servicio de Mantenimiento 

the HR META 4 System and 
del Sistema de RRHH META 4 

and Development Service, IT 
y Desarrollo de sistemas, 

Outsourcing of Regional Soft-
y Outsourcing de Software Fac-

Outsourcing and Oracle Suite 
Outsourcing de TI y Soporte 

ware Factory for the maintenan-
tory Regional para el manteni-

Support 
del Oracle Suite. 

ce of the ERP SAP in 6 Latin 
miento del ERP SAP; 6 países 

American countries
de Latinoamérica.

Repsol

fuel dispatch process 
Sector de 

(Oficina de Normalización 
 (Oficina Normalización 

Telecomunicaciones

Provisional / National 
Previsional): Outsourcing de 

Telecommunications 
Telefonica
Sector
Software Factory de los Siste-

mas: ATIS, Legacies, Módulo 
Telefonica
de Atención de Clientes y de 
Software Factory Systems: ATIS, 
Integración. 
Legacies, Customer Service 

Pension Fund Administrator): 
Software Factory nivel CMMI-3, 

Outsourcing of CMMI level 3 
y de Tecnología de todos los 

Software Factory, of technology 
sistemas y Outsourcing del 

for all systems and outsourcing 
Proceso de Gestión documen-

of the document and file 
taria y de archivo. 

management process

Outsourcing del Proceso de 

and Integration Modules

facturación y cobranzas a nivel 

56

1

2

4

Osinergmin

CONSUCODE

Outsourcing of Process for 

Infrastructure and Base 

Handling Complaints, Field 

Software for the Peruvian 

3

5

1, 2, 3, 4, 5 Centro de Opera-

ciones Tecnológicas de GMD

Banking and Finance

Cavali

Supervision and Supervision of 

government’s procurement 

AFP Integra 

Regulatory Compliance

portal

ONPE

Outsourcing of CMMI level 3 

Software Factory 

Outsourcing of Infrastructure for 

Registry Zone

the Recall of Municipal Authori-

Infrastructure for the Contingen-

ties Process at the national level

cy Site

AFP Horizonte

Outsourcing of Application 

Maintenance and Development

Lima Stock Exchange

Outsourcing of Technological 

Infrastructure 

Outsourcing of the maintenance 

of the Cavali Compensation and 

Liquidation Systems 

Banco de la Nación

Implementation of the bank’s 

Communication Systems

57

 
 
 
 
 
Consulting Engineering

Doe Run Perú Planta de ácido circuito de cobre

58

Gerente General

Walter Silva Santisteban

GMI will be celebrating its 25th anniversary, we would like to mention some relevant 

aspects of its history, not without first indicating that in 2008 GMI achieved excellent 

results, having participated in significant projects at the national level and abroad, 

which has made it possible to attain leadership in engineering in Peru. 

On August 17, 1984, GMI was created from the Technical Section of Graña y Monte-

ro (today GyM S.A.). After initially dedicating its efforts to designing and supervis-

ing large civil works such as irrigation projects, ports and highways, the company 

became involved in more complex industrial projects. Subsequently, it developed a 

specialization in hotel project management abroad and formed a subsidiary called 

Ecotec, specializing in envionmental matters. In recent years, GMI has positioned 

itself as a leader in the design of mining projects and today it is undergoing sig-

nificant growth in the petroleum and gas sectors. The skill acquired over the years 

has led GMI to perform different services abroad, involving mining projects in Ar-

gentina, highways in Bolivia and hotels in the Dominican Republic. 

Today GMI is an organization oriented toward its customers. To serve the private 

sector, it has the Mining, Infrastructure and Industry divisions, while the Supervi-

sion division serves the public sector. GMI is well on its way to achieving its objec-

tive of being a company that grows while learning and managing knowledge, hav-

ing  inaugurated  approximately  2,000  m²  of  new  offices  equipped  with  the  latest 

communication technology, whose design is aimed at ensuring integration, com-

munication, socialization, teamwork in the community and the Learn-Be-Share and 

Grow philosophy. Lastly, with regard to organizational development, its employees 

have completed 20,170 mh of training. 

24 Años de GMI 

1996
Hotel Paradisus Punta Cana 

Rep. Dominicana

(1998–1999)
Hotel Gran Meliá Caracas

59

In 2008, GMI’s activity was US$ 36 million, which represented growth of 56% and cash generation of US$ 5.9 mil-

lion, increasing 68% compared to the preceding year. Net income was US$ 3.2 million, 76% more than that of the 

preceding year.

With regard to our international operations, services for Sol Meliá continued in the expansion of the Paradisus 

and Paradisus Palma Real hotels in Punta Cana and continued supervision of the Moon Palace hotel in the Dom-

incan Republic for the Mexican Palace Resorts chain.

The international crisis that has intensified due to the drop in commodity price indexes indicates that 2009 will be 

a year in which we must pay special attention to our contracts, obtaining competitive margins and placing empha-

sis on added value in order to retain our customers and strengthen commercial ties. This slowdown should be 

seen as a great opportunity to demonstrate the maturity of our processes and management systems, continuing 

with our Knowledge Management and Organizational Development strategies.

60

 
2

1 Contrato Marco de Inge-

niería para Minera Antamina

2 Restaurante Gabi Club 

del Hotel “The Reserve” de 

Paradisus Palma Real – Rep. 

Dominicana

1

Mining Sector

detail Engineering for the Main 

for Nuevo Ciclone, Hydraulic 

the Sample Laboratory, Con-

Connection Networks for the 

Study of PAD 4 and miscella-

struction Management of the 

new Camp

neous Bottleneck-Concentrator 

Demonstration Plant and the  

Compañía Minera Antamina 

projects

S.A.

Minera Chinalco Peru S.A.

La Granja Complex, Construc-

tion Management of mainte-

Under the Engineering Frame-

work Contract, the following 

projects were carried out:

• Management of the construc-

Rio Tinto Minera Peru 

nance work on the Chiclayo 

tion of the Kingsmill Tunnel 

Limitada S.A.C.

- La Granja Access Highway

Treatment Plant – Toromocho 

Under the Engineering Frame-

• Supervision of the Molino 

Project

Sag Bypass, Supervision of 

the Microcell Sparger Cu, Zn, 

work Contract, the following 

Doe Run Peru

projects were carried out:

• Materials management for 

Sociedad Minera Cerro Verde 

• La Granja Camp Engineer-

the new Sulfuric Acid Plant 

preparation of Conceptual En-

S.A.A.

ing, Definitive Engineering for 

for the Lead Circuit and Detail 

gineering for CAPEX estimation, 

review of Design Criteria and 

Detail Engineering Plans for the 

Edificio Principal Project and 

Under the Engineering Frame-

the construction of the La 

Engineering on works outside 

work Contract, the following 

Granja – Northern Route Ac-

the Battery Limit of the Fleck 

projects were carried out:

cess Highway, Engineering and 

Chemical contract

• Supervision of Quality Control 

Construction Management for 

61

 
 
 
Minera Barrick Misquichilca 

Votorantim Metais – 

GyM

Perenco Peru Limited 

S.A.

Cajamarquilla S.A.

• Basic and Detail Engineering 

Peru Branch 

• Detail Engineering for the 

Under the Engineering Frame-

for Lot 58 Production Platform 

• Basic Engineering for the 

cutting of overland, new Ore silo 

work Contract, 31 projects 

and La Peruanita Camp, Review 

Dorado – Andoas Pipeline

and Conveyor Belt No. 03.

were carried out according to 

of Basic Engineering and prep-

the FEL (IPA) methodology, up 

aration of the Detail Engineering 

Minera Yanacocha S.R.L.

to FEL 2 level for the CAPEX 

for the Topping Plant

Under the Engineering Frame-

estimation to streamline and 

work Contract, the following 

optimize operations in the dif-

Infrastructure and 

Transportation

projects were carried out:

ferent areas of the refinery 

Hydrocarbons

Provias Nacional

• Engineering for different proj-

ects for Yanacocha and Conga, 

Detail Engineering AWTP East, 

Buildings 

Detail Engineering for Ring 

and Industry

• Supervision of road improve-

PetroPeru S.A. 

ment work on the Mojón 

• Supervision of Environmental 

– Chiquian – Aquia Highway, 

Remediation work at La Pam-

New Conococha – Huallanca 

Piping & System Project, Fifth 

pilla refinery and its Sales Plant

Highway Junction, Section 1: 

Retort and Improvements in 

Cemento Andino S.A.

Mojón Chiquian, Supervision of 

the Yanacocha North Ventila-

• Service Contract for Industrial 

La Pampilla Refinery

the Maintenance of the Ciudad 

tion System, Detail Engineering 

Cleaning and Waste Manage-

• Under the Detail Engineering 

de Dios Cajamarca Highway 

for Maqui Maqui Project and 

ment by our subsidiary, Ecotec 

Framework Contract on RELA-

Section II – Chilete – Cajamarca 

Chaquicocha Dewatering

S.A.

PASA investment projects

Sector 2-A Chilete

62

2

3

1 Paradisus Palma Real 

– Rep. Dominicana

2 Planta de tratamiento de 

aguas ácidas para minera 

Yanacocha

3 Carretera Tarapoto – Juanjui 

1

Ositran 

• Supervision of section 5 of 

the Southern Interoceanic Cor-

ridor – Peru – Brazil

Survial

• Definitive Engineering Stud-

ies and Environmental Impact 

Studies for the San Juan de 

Marcona Nazca Highway Works 

and Rehabilitaiton 

– Puquio 

– Cusco – Urcos; Geotechnical 

Inspection of the Interoceanic 

Peru Lng 

Highway Southern Section 1 

• Narrative technical report on 

and Engineering support 

current condition of the surface 

course and buildings near the 

Shougang Hierro Peru S.A.A.

access routes for the Peru LNG 

• Layout of the route for the San 

Gas Pipeline between Pampa 

Juan Highway – Pan American 

Melchorita and Chiquintirca

Highway

Minera Yanacocha S.R.L.

• Supervision of the 73 Km 

Chilete Junction Highway 

Votorantim Metais 

Cajamarquilla

• Supervision of the 

construction of the Highway to 

– Chalhuanca – Abancay 

Cajamarca 

Cajamarquilla

63

 
 
 
 
Petroleum Services

Planta de Fraccionamiento de Gas, Pariñas – Talara

64

Gerente General

Francisco Dulanto Swayne

24 Años de GMP

In the year 2009, GMP S.A. will be celebrating its 25th anniversary. It began its op-

erations in 1984 with the diversification process of the Graña y Montero Group.

Initially, GMP conducted its operations in the province of Talara, providing produc-

tion and maintenance services at petroleum camps. Subsequently, it began provid-

ing well drilling services. Currently, GMP is in charge of the operation of Lots I and V 

in the northwest, the operation of 9 fuel terminals in the country and the marine op-

erations  of  the  Camisea  project  in  a  joint  venture  with  Oiltanking  GMBH.  It  is  the 

owner and operator of the natural gas liquids separation and fractionation plant in 

Pariñas and has formed LQS (Logística de Químicos del Sur) with Oiltanking and 

1983 – a la fecha
Unidad de bombeo, Piura

Santa Sofía Puertos.

The results for this year have been quite satisfactory, with US$ 69 MM billed, which 

represents growth of 16.7%.

Additionally, during the period construction was completed and operations began at 

the Gas Plant in Pariñas with an investment of US$ 44.6 million.

In summary, it was a year in which the company had its highest figures ever for the 

amount billed, profits and investments. 

In the month of August, a concession contract was signed for the Pisco-Lurín Multi-

Purpose Pipeline stemming from an initiative approved by PROINVERSION, in order 

to transport LPG between these two cities and to supply the southern section of Lima.

1998 – a la fecha
Almacenamiento y despacho 

de combustible

Mention should also be made of the efforts made in the area of social responsibility 

and the achievements that they represented in the communities related to the com-

pany’s activities.

65

Petroleum and Gas Production

Drilling

In the year 2008, 9 development wells were drilled in lots I and V 

By the end of the year 2008, 20 oil wells had been drilled 

and 403 thousand barrels of petroleum and 1,751 MMSCF of natural 

in the Talara area and 2 water injection wells had been 

gas were produced. These figures represent increases of 8.52% 

drilled in the northern Peruvian jungle. The total num-

and 20.74% compared to the volumes for the year 2007. The second 

ber of feet drilled as drilling contractors was 91 thousand.

semester of the year was marked by very high crude price volatility. 

Talara Gas Plant

On October 23, the new Pariñas Gas Plant began operations. The 

amount of natural gas processed at the plants during the year 2008 

was 10.01 BSCF, which is an average of 27.43 MMSCFD and the 

production of liquids totaled 293 thousand barrels. The new Pariñas 

plant has enabled us to increase efficiency substantially in the 

recovery of liquids. 

66

 
4

5

1 Terminal Marítimo de Pisco 

para Camisea

2 Tanque de crudo de Talara

3, 4, 5 Planta de gas de Talara

1

2

3

Consorcio Terminales

LQS Matarani 

(Logística de Químicos del Sur)

In the year 2008, Consorcio Terminales (GMP/Oiltanking) dispatched 

During the year, 29,207 tons of sodium hydrosulfide (NaSH) were re-

an average of 63 thousand BPD of products at the country’s 

ceived at the Port of Matarani for our mining customers in the area 

terminals, which was a 10.1% increase compared to the preceding 

(Sociedad Minera Cerro Verde and Southern Peru Copper Corpora-

year and storage by our users amounted to 1.82 million barrels on 

tion). For the coming year, construction of a plant for the reception, 

average, which was 8.32% higher than in the year 2007.

storage and dispatch of sulfuric acid at the same port is planned.

At the Camisea (Pisco) marine terminal, 105 vessels were loaded 

with a total volume of 13.1 million barrels.

67

 
 
 
 
Construction Services

Hotel Westin Libertador San Isidro (2008–2010)

68

Gerente General

Juan Manuel Lámbarri Hierro

75 Años de GyM 

Continuing with the country’s growth, in the year 2008, GyM grew to set a new record 

of approximately US$ 448 million in sales, which represented growth of 20% over the 

preceding year and resulted in after-tax profits of US$ 23 million. These results are 

based on improvement in our efficiency, as we obtained a gross margin of 15% and 

ended the year with a backlog of over US$ 500 million.

Consolidating the strategy of leading in the construction and promotion of afford-

able housing, in the month of September, GyM joined forces with another company 

and won the contract award for the real estate project called Nuevo Hábitat Comas 

(Collique), which shall include 15 thousand economical housing units. Additionally, 

we have acquired a 52 mil m² lot in the district of Cercado de Lima, where we shall 

1997–1998
Planta concentradora 

de Cuajone

build 2,500 additional housing units. 

It should be noted that, in line with the strategy of generating a specialization in this 

market, in the latter part of 2008 the GyM Board of Directors approved the spin-off of 

the real estate division of GyM, which was assigned to a new company called GMV 

S.A., which shall be in charge of executing these projects. 

As part of the participation in gas exploitation in Peru, in a joint venture with a for-

eign company, GyM began the construction of the Chiquintirca Compressor Station 

in the department of Ayacucho, which is a pivotal project to Peru LNG. 

In the month of March of 2008, GyM was awarded the contract for the construction of 

two  fractionation  plants  (topping  plants)  under  the  Engineering,  Procurement  and 

Construction modality for Pluspetrol Norte in Lot 1AB in Andoas and in Lot 8.

1974
Hotel Sheraton, 

Lima

69

Recently, the contract award was obtained for civil works and assembly of the expansion at the Machu Picchu hydro-

electric plant. This key project shall increase the generation capacity of this plant by approximately 100 MW, thus 

triggering development of the southern part of the country. 

As a result of the growth and the demanding nature of the market, GyM reinforced its staff of engineers and profes-

sionals, increasing the number of employees by 30% to enable us to take on new challenges with the efficiency and 

quality we are known for. 

Aware that knowlege is the pillar with which GyM has managed to thrive over time, consolidating its position as the 

leading construction company in the sector, during the year 2008 it banked on maximizing its knowledge manage-

ment by promoting the “Learn to Grow” program as a key factor in future growth. Therefore, it has provided 59 thou-

sand man-hours of training, 20% more than in the preceding period.

It is noteworthy that in 2008 GyM, Peru’s oldest, most prestigious construction company, celebrated its 75th anniver-

sary. What began in 1933 as a technical firm of 3 engineers now has over 1,260 employees and more than 9,000 la-

borers and conducts its activities in almost all of the departments of Peru. It would take too many pages to list all of 

the small and large projects that GyM has executed for development of Peru. 

This success is due to the participation of its workers throughout these 75 years and special thanks go out to each 

and every one of them. 

70

 
1

2

3

4

1 Torre Abaco

2 Línea de transmisión 
Mazuco – Pto. Maldonado

3 Refinería de Cajamarquilla

4 Paseo de los Héroes Navales

Mining Sector

Minera Goldfield La Cima

Minera Río Tinto

Energy Sector

Civil Works and Mechanical 

Exploratory Tunnel in the La 

Minas Buenaventura 

Assembly in the Cerro Corona 

Granja Mine

4,219.60 meters of tunnels, 

Project

Pluspetrol Norte

• Re-injection of Production 

828.90 m of Horizontal Excava-

tions and 70.3 mts of Vertical 

Votorantim Metais – 

Miscellaneous works

• Environmental Improvement 

Minera Cerro Verde

Waters

Excavations in Poracota

Cajamarquilla S.A.

Indium Thickener

Compañía Minera Antamina

Minera El Brocal

Indium Plant Structural and 

Services and facilities at the

10 years working jointly in the 

Electromechanical Assembly

Yanacancha Camp

open pit and moving 7,976,059 

Stebbins Tanks

m3 of earth and 671,334 m3 of 

Civil Works and Assembly 

mineral in 2008 

Indium Refinery

Cell House Buildings

Roaster and Acid Plant

Program

• Highway Maintenance

• Topping Plants

LNG

Electrical and Instrumentation 

Works

Structural Assembly and Piping 

at the Terminal

71

 
 
 
 
Underground

Buildings

Camps

Main Civil Works

Tank Foundations

Pluspetrol Corporation

Expansion of the Malvinas Gas 

Compression Plant 

GMP

Expansion and Modernization 

of the Pariñas Gas Plant

Ministry of Energy and Mines

San Gabán Mazuco – Puerto 

Maldonado Transmission Line

TGP

Chinquitirca Compressor 

Station

CELEPSA

Northern IIRSA:

Inserfinsa

Paucarcocha Dam

110 km of highway Tarapoto-

Santo Toribio Office Building

Lining of the Platanal Shaft

Yurimaguas asphalted during 

PETROBRAS

Lot 58

Infrastructure

Sector

the year

Hipermercados Tottus 

in Los Parques del Agustino

Buenos Aires-Canchaque 

Highway

Earth Movement and Reloca-

Pro Ecclesia Santa

tion of Works of Art, Prime Coat 

Church in Surco

Work

Inmobiliari

Southern IIRSA – Section 1:

City of Lima

Capital Office Building

Recycling and foamed asphalt 

Paseo de los Héroes Navales 

work

Interchange

Westin Libertador Hotel

Southern IIRSA – Section 2:

118 kms asphalted during  

Building and Real 

Office Building for the ABACO 

the year

Estate Development 

Group

303-room hotel in San Isidro

Sector 

Southern IIRSA – Section 3:

Distribution Center for 

237 kms asphalted during  

Novotel

UNIQUE

the year

210-room hotel in San Isidro

72

2

3

1 Edificio Capital

2 Conjunto Residencial 
Los Parques del Agustino

3 Pampa Melchorita 
Fundaciones de 

tanques para Perú LNG

1

Inmobiliaria Viena S.A.

Telecommunications

Kimberly Clark

CBI

Golf Millenium Project

Sector 

Design and installation of 

Implementation of the Fire 

structured wiring in fiber optics 

Detection System at the Per-

Balta 1070 Residential Buil-

Ministry of Education

(Backbone) and wireless system 

manent Camp and YSBL and 

ding in Miraflores

Structured and Electrical Wiring 

for the production plant in 

OSBL Buildings in the project 

for Computers in the Huascarán 

Santa Clara; structured UTP for 

for Peru LNG (Melchorita lique-

Golf Los Inkas Residential 

Project nation-wide 

Camacho offices 

faction plant in Cañete)

Building - Monterrico

TELMEX

Emsa – Yanacancha

Telefónica

Housing Complex 

Infrastructure set up in 11 

Implementation of the Fire De-

Miscellaneous works

Los Parques del Agustino 

turn-key equipment rooms and 

tection System at Yanacancha 

installation of Huawei and Cisco 

for EMSA

Javier Prado 200 Appartment 

communication equipment

Building – Magdalena

73

 
 
 
Highway Maintenance 
And Operation

Carretera IIRSA Norte

74

Gerente General

Jaime Targarona Arata

14 Años de Concar 

1994
Concesión carretera 

Arequipa – Matarani

The year 2008 has been a year in which Concar continued with its Growth Plan, fur-

ther consolidating its position as a leading company specializing in highway opera-

tion and maintenance. It participated actively in the Ministry of Transportation and 

Communications’ Peru Project and obtained the contract for the maintenance of the 

380+Km section of the highway connecting Ayacucho with Abancay, passing through 

Andahuaylas.  This  section  is  an  unpaved  compacted  road,  due  to  which  we  have 

initiated a new experience in the maintenance of unpaved compacted highways. In 

addition, because activities related to the Northern IIRSA Highway contract and the 

specialization in periodic maintenance of asphalted highways have increased, in-

vestments in specialized equipment were made. Also in the year 2008, the construc-

tion of the first phase of the Ancón – Huacho – Pativilca highway was completed and 

repair  work  began  on  the  San  Juan  de  Marcona  –  Urcos  highway,  as  well  as  the 

highway that runs from the detour to the town of Buenos Aires to Canchaque in the 

department of Piura. 

With the Buenos Aires – Canchaque contract, CONCAR has reached a total of over 

2,700 Km of highways for which it is in charge of road operation and maintenance. A 

greater volume of periodic maintenance work on the roads for which the concession-

aires are responsible is projected for the future, without neglecting to participate in 

governmental processes related to the Peru Project. 

The  results  for  the  year  2008  are  quite  satisfactory.  Sales  increased  by  more  than 

30%, totaling over US$ 19 million, with margins above 15%, and there is a backlog 

2006 – a la fecha
Carretera IIRSA Norte

amounting to over 60 million dollars, apart from the ample program announced by 

the  government  for  the  year  2009  in  relation  with  the  Peru  Project,  guaranteeing 

growth in the upcoming years. 

75

The projects under concession and CONCAR’s responsibility are listed below.

Operation and maintenance of Ancón – Hua-

Operation and maintenance of the Northern 

cho – Pativilca Highway

IIRSA Highway, Paita – Yurimaguas

During the year 2008, CONCAR satisfactorily handled the operation 

Since April of 2006, CONCAR has been in charge of the operation 

and maintenance work on approximately 285 Km of highway, in 

and maintenance of the Northern IIRSA Highway, which is approxi-

addition to providing support to Norvial by developing procedures 

mately 955 Km long.

for technical solutions to specific problems. 

Operation and maintenance of Section 1  

of the Interoceanic Highway

In the month of December 2007, the operation and maintenance 

work began on the approximately 755 Km long highway that joins 

the Port of San Juan de Marcona and the city of Urcos in the 

department of Cuzco.

76

1

2

3

4

1, 4 Proyecto IIRSA Norte

2 IIRSA Sur 

3 Mapa de ubicación 

concesiones CONCAR

Service Contract for Routine and Periodic 

Contrato de Servicios de Mantenimiento 

Maintenance on the 400 Km Tacna – Camia-

Rutinario Puesta a Punto de la Carretera 

ra Bridge, Tacna – Tarata, Tacna Palca, Tac-

Ayacucho – Puente Sahuinto

na – La Concordia and Tacna – Ilo highway

En asociación con GyM con un contrato por 5 años para servicio 

este contrato en diciembre del 2008, para ejecutarse en el plazo  

de mantenimiento.

de 4 años.

Con una extensión aproximada de 380 Km, se dio inicio a  

77

 
 
 
Entertainment and Fashion 
Center

Fashion Center – Larcomar

78

Gerente General

Antonio Rodríguez Canales

10 Años de Larcomar 

1998
Centro de Entretenimiento 

Larcomar

It  is  our  pleasure  to  present  the  2008  Annual  Report,  which  shows  the  best  results 

obtained by the company since it was founded 10 years ago, once more exceeding 

growth  expectations  in  commercial  and  financial  terms,  as  well  as  positioning  in  

the industry. 

Larcomar  opened  its  doors  10  years  ago,  on  November  28,  1998,  offering  a  wide, 

select range of entertainment, culture, cuisine and merchandise in a modern, novel 

open-air architectural format on the cliffs overlooking the Pacific Ocean in Miraflores, 

which has become the image representing the modern aspect of Lima. 

During the year 2008, the commercial activity, oriented toward offering the best expe-

rience in a safe environment with quality, was visited by 6 million people, including 

815 thousand tourists, which was 4% more than in 2007, enabling the operators to 

bill a total of US$ 58 million dollars, 27% more than in the preceding year. 

This volume of activity has reinforced Larcomar’s positioning as an industry leader 

in tourist attractions, shopping centers and entertainment centers. The satisfaction 

level  among  all  segments  of  visitors  is  96%,  which  we  have  maintained  since  the 

startup of operations. 

Larcomar is increasingly being promoted in the tourist and cultural circuit of the city 

of Lima, while different events have been held and well-known personalities visited 

during  the  EULAC  and  APEC  summits.  The  “modern  face  of  the  city”  concept  has 

been well received by travel agencies, hotels and public organizations and is being 

2006–2007
Construcción del Fashion 

Center de Larcomar

disseminated at international fairs and important tourism forums. 

Larcomar  -  Fashion  Center’s  financial  position  has  been  consolidated  and  a  25% 

reduction in financial expenses has been obtained due to improvements in rates and 

payment periods related to structural debt that were negotiated last year. 

79

Operatively, the team composed of 211 employees has actively participated in the maintenance of the facilities, in 

safety drills conducted jointly with Indeci (civil defense) and the fire department, gaining significant experience, 

which has been reinforced with an annual average of 59.15 hours of training per employee. 

In the field of corporate social responsibility, Larcomar - Fashion Center participated in programs promoted by 

Miraflores City Hall, such as “Adopt a School”, as well as those organized by Asetumi, the association for the 

promotion of safe tourism in Miraflores.

In 2008, these strategies resulted in 98% occupation of the leasable area, total company activity for the year of 

US$ 9.9 million and EBITDA of US$ 4.6 million, which represented a 10% increase as compared to the year 2007. 

Lastly, it should be noted that organizational maturity, together with financial soundness due to the positive finan-

cial results obtained over these 10 years, make it possible to look toward the future with optimism despite the re-

cent  international  financial  crisis.  For  this  reason,  it  has  been  proposed  that  the  original  Larcomar  project  be 

completed with the construction of a first class hotel with 300 guest rooms, with work starting on it in 2009. This 

objective confirms the vocation for innovation and growth that result in stable cash flows and generate real estate 

and construction synergies with the company’s shareholders.

80

1

2

1 Centro comercial y de 

entretenimiento Larcomar

2 Fashion Center 

Larcomar 2006–2007

3

3 Interior Fashion Center LM

Los principales operadores por área son:

Area Inmobiliaria, principales operadores, anunciadores y franquicias.

Alpaca 111

Tatoo

Bembos

Nike

HushPuppies

Starbucks

Air Sport Club by Nike

Florsheim

Chilis

Aura

Gótica

UVK

Liliana Castellanos

Swatch

Tony Romas

La Dama Juana

Timberland

Laritza

Backus

Pizza Hut

Café Café

Phillip Morris

GMO

NU

Íbero

Burger King

Giuliana Testino

KFC

Mangos

Makoto

Telefónica

Claro

81

 
 
 
 
82

SOCIAL 
RESPONSIBILITY

Social

Human Resource 

Risk prevention and 

Knowledge 

Community Relations

Responsibility

Management

Environment

Management

86

88

94

96

98

83

84

85

Social Responsibility

The growth of our operations and the economic results obtained 
have been accompanied by an on-going commitment to our 
employees and the communities with which we are connected  
in the course of our activities, guided by corporate values that call  
for ethical conduct and institutional outreach. 

In June of 2008, Espacio Azul, a not-for-profit civil asso-

Mariano Melgar District City Hall in Arequipa officially 

ciation  founded  by  the  companies  in  the  Graña  y 

and  publicly  recognized  Espacio  Azul  for  the  profes-

Montero Group, began its activities with the objective of 

sional technical assistance it offered in the preparation 

centralizing efficient execution of its social responsibil-

of pre-investment studies for the installation of drinking 

ity plans to benefit our country’s communities. The work 

water  and  sewer  systems  that  will  benefit  over  23,000 

of this new entity and its associates has been well re-

inhabitants of the high-altitude areas it serves. 

ceived  and  has  obtained  significant  recognition  from 

the community for its contributions. 

Recognition  such  as  the  foregoing  strengthens  our 

Within  the  framework  of  the  46th  Annual  Executives’ 

ny, sharing our knowledge and experience to benefit 

Conference  (known  as  CADE),  Graña  y  Montero  re-

the community. 

commitment to reach beyond the limits of the compa-

ceived the Luis Hochschild Plaut award for its contribu-

tion to education through the “Developing Job Skills in 

the  Areas  of  Influence”  program.  By  the  same  token, 

86

Premio Luis Hochschild Plaut por el aporte de Graña y Montero a la educación

In accordance with our corporate policy of transparency 

Our commitment to our own employees is maintained 

and our role as signatory members of the World Pact pro-

as the key element of our daily operations. Therefore, 

moted by the United Nations, we informed such organi-

we  continue  implementing  human  resource  manage-

zation of the set of social responsibility activities carried 

ment policies aimed at achieving increasing degrees of 

out and we have been the object of annual IDB audits of 

personal and professional satisfaction among the em-

our projects, the result of which was certification that our 

ployees,  providing  them  with  the  best  working  condi-

activities  are  in  compliance  with  good  social  practices 

tions and safety for the performance of their jobs. 

both within and outside of our organization. 

8787

 
Human Resource Management

The Group’s significant economic growth entailed a significant 
increase in the total number of workers, which reached 13,012; that  
is, an increase of about 9% compared to the previous year. The 
number of professional employees has risen 14%, reaching 1,947, 72% 
of whom are engineers with different areas of specialization. 

As a result of this growth, with the objective of support-

enhanced in coordination with our Corporate Learning 

ing  efficient  human  resource  management  aimed  at 

Center.  The  basic,  intermediate  and  advanced  pro-

the  personal  and  professional  development  of  its  em-

grams aimed at developing professional competencies 

ployees, during the year the company inaugurated the 

consolidated  ordinary  program  planning.  The  conclu-

new  Corporate  Learning  Center  facilities.  These  in-

sion of the first highly specialized internal program for 

clude a new auditorium, an exhibition room with audio-

project managers, in which 33 engineers from different 

visual equipment and new classrooms. Likewise, on the 

companies  within  the  Group  participated,  merits  spe-

top  floor  of  our  headquarters,  a  modern  gymnasium 

cial mention. 

was inaugurated in order to offer our employees a set 

of modern equipment and services for a lifestyle aimed 

As one of the events held to celebrate Graña y Monte-

at their overall wellbeing. 

ro’s 75th anniversary, the Group’s employees and their 

As the organization is mainly composed of engineering 

maraderie and identification with the achievements of 

professionals  and  places  special  emphasis  on  knowl-

the group throughout its history prevailed. Additional-

edge management, training activities continued being 

ly, all of the Group’s employees and workers received 

spouses were invited to a lovely dinner where joy, ca-

88

Auditorio del Centro Corporativo de Aprendizaje de Graña y Montero

a  copy  of  the  book  titled  “Peruvians  Building  Peru”, 

In  the  annual  assessment  of  workplace  climate  orga-

which was published on the occasion of the organiza-

nized by the Great Place to Work Institute, 84 % of the 

tion’s 75th anniversary in honor of everyone who con-

participants stated that they were proud to be working 

tributed  toward  making  our  organization  what  it  is 

for a company pertaining to the Graña y Montero Group, 

and  who,  with  their  daily  efforts,  urge  us  forward  to-

which further reinforces our commitment to the personal 

ward new achievements. 

and professional development of our employees.

89

Estadística Formación

N° de Personas

G&M S.A.A.

GyM

GMD

GMP

GMI CONCAR Larcomar

Total

Empleados Planilla Subsidiarias

Ingenieros / Arquitectos con Post Grado

Otras Profesiones con Post Grado

Profesionales de Ingeniería / Arquitectura

Otras Profesiones

Total Profesionales

Técnicos

Total Empleados Planilla Subsidiarias

Obreros

Obreros Especializados

Obreros No Especializados

Obreros Subcontratistas

Total

14

6

5

18

43

5

48

0

0

0

0

52

5

659

295

1011

249

1260

3334

3775

1907

9,016

18

7

354

39

418

405

823

0

0

0

0

21

0

61

29

111

252

363

0

0

0

0

20

4

156

92

272

159

431

60

0

0

60

5

23

37

5

70

759

829

0

0

0

0

0

4

5

13

22

38

60

0

0

0

0

130

49

1227

491

1947

1867

3814

3394

3775

1907

9076

Total Personal

48

10,276

823

363

491

829

60

12890

Practicantes

Profesionales Independientes

Total

0

2

2

59

6

65

38

0

38

3

3

6

3

3

6

2

0

2

2

1

3

107

15

122

Total General

50

10,341

861

369

497

831

63

13012

90

Gimnasio de Graña y Montero

Distribución por Edades al 31.12.08

N° Empleados

Menos de 20

De 20 a 30

De 31 a 40

De 41 a 50

De 51 a 60

De 61 a 65

De 66 a más

Total

G&M S.A.A

GyM

GMD

GMP

GMI CONCAR Larcomar

Total

0

10

15

13

8

1

1

1

513

393

207

110

25

11

0

284

405

103

28

3

0

48

1,260

823

0

55

68

112

107

16

5

363

0

135

123

96

58

8

11

6

327

307

141

44

4

0

0

17

21

17

5

0

0

7

1341

1332

689

360

57

28

431

829

60

3814

91

Estadística Poblacional

N° de Personas

Organización

Oficinas Principales

Proyectos

Total

Genero

Masculino

Femenino

Total

Jerarquía

Alta Dirección

Empleados

Practicantes

Profesionales Independientes

Obreros

Total

G&M S.A.A.

GyM

GMD

GMP

GMI CONCAR Larcomar

Total

48

0

48

37

11

48

24

24

0

2

0

243

1017

1,260

1010

250

1,260

7

1,253

59

6

9,016

465

358

823

576

247

823

4

819

38

0

0

68

295

363

334

29

363

13

350

3

3

0

50

10,341

861

369

187

244

431

340

91

431

5

426

3

3

60

497

17

812

829

725

104

829

5

824

2

0

0

60

0

60

42

18

60

3

57

2

1

0

1088

2726

3814

3064

750

3814

61

3753

107

15

9076

831

63

13012

92

Estadística Modalidad Contractual 2007–2008

N° de Personas

.

.

.

A
A
S
M
&
G

.

7
0
2
.1
1
3

.

.

.

A
A
S
M
&
G

.

8
0
2
.1
1
3

M
y
G

.

7
0
2
.1
1
3

M
y
G

.

8
0
2
.1
1
3

D
M
G

.

7
0
2
.1
1
3

D
M
G

.

8
0
2
.1
1
3

P
M
G

.

7
0
2
.1
1
3

P
M
G

.

8
0
2
.1
1
3

I

M
G

.

7
0
2
.1
1
3

I

M
G

.

8
0
2
.1
1
3

.

7
0
2
.1
1
3

R
A
C
N
O
C

.

8
0
2
.1
1
3

R
A
C
N
O
C

.

7
0
2
.1
1
3

r
a
m
o
c
r
a
L

r
a
m
o
c
r
a
L

.

8
0
2
.1
1
3

l

a
t
o
T

.

7
0
2
.1
1
3

l

a
t
o
T

.

8
0
2
.1
1
3

Tipo de Contrato Laboral

Empleados

Con Vinculo Permanente

Con Vinculo Temporal

Total Empleados

44

0

44

Obreros - Régimen Común

47

199

208

160

198

1

862

1052

634

625

190

168

206

157

29

38

27

53

431

393

710

776

48 1061 1260

794

823

358

363

460

431

737

829

Con Vínculo Permanente

Con Vinculo Temporal

Rég. Esp. Cons. Civ 
(Vinculo Temporal)

Total Obreros

0

0

0

0

0

0

0

0

891

706

0

7125 6403

0 8016

7109

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

64

0

0

60

0

0

64

60

0

0

0

0

0

0

0

0

47

3

50

0

0

0

0

58

696

808

2

2808

3006

60

3504

3814

0

0

0

0

0

955

766

7125

6403

0

8080

7169

Total Empleados 
y Obreros

44

48 9077 8369

794

823

358

363

524

491

737

829

50

60 11584 10983

93

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
Risk prevention and Environment

In line with our risk prevention and environmental policies, 
responsible conduct regarding the environment and employees’ 
health while they are performing their work is a distinctive practice 
of all employees of Corporación Graña y Montero.

This  good  practice  generates  value  and  an  unavoid-

the efforts of approximately 13 thousand workers who 

able commitment to our customers and society. 

have done their best to perform their activities, adher-

Our organization has developed an integrated risk pre-

spect for the environment. Our personnel’s commitment 

vention  and  environmental  management  system,  tak-

to the corporation’s policies has enabled us to end the 

ing the OHSAS 18001 and ISO 14001 guidelines as a 

year  2008  with  no  environmental  incidents  and  a  fre-

ing to the fundamental principles of job safety and re-

reference for the purpose of guaranteeing fulfillment of 

quency index of 0.88.

the commitments established in our policies. This sys-

tem is audited annually by the IDB, which certifies its 

The investment that our organization makes in guar-

effective, efficient implementation for the benefit of our 

anteeing the health and safety of its workers is evident 

customers  and  everyone  working  on  the  projects  for 

in the increasing preventive culture and the on-going 

which we are responsible, as well as the immediately 

protection of its employees against work-related risks. 

surrounding environment. 

During the year 2008, no less than 738 thousand hours 

During  the  year  2008,  Corporación  Graña  y  Montero 

nel and raising awareness among them regarding the 

has generated no fewer than 35 million man hours, with 

inherent risks of their jobs. In addition, US$ 6.0 million 

were invested and recorded in instructing our person-

94

Conducta responsable con el medio ambiente

in personal and collective protection equipment have 

been acquired. 

These results have earned us recognition from our cus-

tomers over the last five years and resulted in their con-

tinuing to have confidence in us and awarding us con-

tracts  for  new  projects  that  enhance  and  prolong  our 

status as a business group. 

95

Knowledge Management

The year 2008 has marked an important phase of development  
and consolidation of our “Learn to Grow” strategy. 
The incorporation of a special work group composed of the Human 
Resources managers from all of the companies has made an 
important exchange of experiences possible, which together with 
coordination and alignment has generated synergy among the 
companies in order to achieve the objectives established. 

This year, the ratio of training hours per employee in-

The publication of bulletins by the companies, as well 

creased 6.15% over the ratio for 2007, with the notewor-

as  the  presentation  of  talks  and  reports  on  different 

thy participation of the Internal Educators and instruc-

projects  has  contributed  toward  increasing  communi-

tors from the companies that have made 68% Internal 

cation and promoting the exchange of experiences in 

Training  possible.  The  total  number  of  training  hours 

different projects. 

amounted to 182,751 man-hours, which represented a 

70% increase as compared to 2007. 

Lastly,  agents  of  change  are  being  generated  in  the 

Significant  progress  has  been  made  in  the  develop-

knowledge  that  shall  enable  us  to  continue  being  an 

ment  of  portals  or  Internet-based  communication  sys-

“organization that learns”.

companies, thus fostering a culture of prioritization of 

tems  that  facilitate  our  professionals’  access  to  the 

companies’  structured  knowledge  and  permit  interac-

tion  among  them  through  forums,  etc.  that  have  enjo-

yed a very good level of participation. 

96

Desarrollo de habilidades directivas

Capacitación año 2008 Horas – hombre

Descripción 

GyM

GMD

GMI

GMP

Concar

Larcomar

Total 

Programa Básico- Ingenieros Jóvenes

 16,918 

 8,062 

 746 

 8,246 

 1,029 

73 

 35,074 

Desarrollo Profesional 

Memoria Colectiva

Capacitación Externa

Total General

 20,926 

 15,022 

 11,894 

 1,102 

 46 

 35 

 288 

 104 

 38,405 

1,308 

 87,843 

 50 

 25 

 1,362 

 19,892 

 13,827 

 7,496 

 13,946 

 1,168 

 2,143 

 58,472 

 58,838 

 36,957 

 20,171 

 22,584 

 40,652 

 3,549 

 182,751 

Promedio anual empleados

Ratio: HHs de capacitación/ Empleado

 1,222 

 48.15 

 788 

 613 

 358 

854 

 60 

 46.90 

 32.91 

 63.08 

 47.60 

 59.15 

 3,895 

 46.92 

PDR - GA - Obreros 

667,758

NA

16,795

27,252

26,338

NA

738,143

9797

 
 
 
 
 
 
 
 
Community Relations

Throughout the year 2008, we continued developing social 
responsibility plans during the execution of our projects, aware of 
the importance of developing good relations with the surrounding 
communities and sharing knowledge about our engineering activity 
with them, in favor of their sustainable development. 

In line with our Social Responsibility Policy, priority has 

During the year 2008, through the execution of different 

been given to activities whose line of action is educa-

social  responsibility  plans,  approximately  13,643  peo-

tion  and  Job  Training  Workshops  were  held  to  benefit 

ple  have  benefited  from  actions  related  to  education 

the local populations where we carry out our projects, 

and 24,015 people have benefited from other activities 

whether  in  rural,  urban  or  marginal-urban  settings  in 

related to the environment or other issues in the com-

different  parts  of  the  country.  For  this  reason,  we  re-

munity’s interest. 

ceived  the  annual  “Luis  Hochschild  Plaut”  award  for 

Graña  y  Montero’s  contribution  to  education  through 

In addition, as part of the corporate social responsibil-

the  “Developing  Job  Skills  in  the  Areas  of  Influence” 

ity  projects  carried  out  to  benefit  the  community,  our 

program, as well as recognition from Peru 2021 for our 

civil association, Espacio Azul, provided technical as-

contribution  to  corporate  social  responsibility  in  the 

sistance and specialized advisory services for the ex-

community  category  in  relation  with  the  “Developing 

ecution of social investment projects, among which the 

Skills for Insertion in the Job Market” program. 

service  provided  to  the  municipalities  of  Miraflores 

and Mariano Melgar in the city of Arequipa stand out. 

Due to this assistance, having complied with SNIP/Na-

98

Responsabilidad Social
Capacitación indirecta clases 

practicas taller de construcción 

de viviendas en adobe mejorado 

comunidad Contagallo – Cañete.

Donación Biblioteca
Colegio Jabonillal de Talara – 

2008.

Mujeres andinas emprendedoras

tional  Public  Investment  System  requirements,  both 

The  following  is  a  summary  of  the  different  actions 

municipalities  were  able  to  gain  access  to  financing 

carried  out  in  the  different  areas  of  influence  of  our 

that enabled them to expand their drinking water and 

operations. 

sewer networks. 

Proyectos de Responsabilidad Social

INICIATIVA

GRUPO OBJETIVO -

LUGAR

BENEFICIARIO DIRECTO 

Apoyo continúo al colegio Jabonillal: Donación de biblioteca, 

Alumnos de la Institución 

Talara – Piura

vivero, mejora en infraestructura, útiles, uniformes y medicinas; 

Educativa Jabonillal Pariñas 

Apoyo económico para actividades de esparcimiento y Talleres 

Talara

para los padres.

Charlas de Educación Vial denominadas “Educación en Seguridad 

Niños y Niñas de Instituciones 

Paita – Piura; Ancón / Huacho 

Vial” 8,829 horas de capacitación

Educativas cercanas a: Carretera 

/ Pativilca – Lima; San Juan de 

Paita – Yurimaguas Proyecto 

Marco – Cusco; y Pachia / Toma-

IIRSA Norte; Carretera Ancón 

siri / Sama Las Yaras – Tacna

– Huacho – Pativilca; Carretera 

San Juan de Marcona (Nazca) / 

Urcos (Cusco) IIRSA Sur Tramo 

– 1 y Proyecto Conservación Vial 

Tacna.

Coordinación para Capacitación Laboral “Construcción de Vivienda 

Comunidades de Cañete

Cañete – Lima 

con Adobe Mejorado” en alianza con CB&I y la ONG CARITAS

Diálogos y coordinaciones con dirigentes para implementación de 

Dirigentes: CLAS del Distrito de 

Lurín/Cañete – Lima y Chincha 

Talleres de Capacitación para la Inserción Laboral en construcción 

Lurín – zona A; Sindicato de CC 

– Ica

Civil

de Lurín; comunidades de Ca-

ñete y Yauyos; comunidades de 

Chincha – Cañete y Coordinado-

res de Municipios.

Talleres de Capacitación para la Inserción Laboral en construcción 

Pobladores de las comunidades 

Buenos Aires – Piura; El Agustino 

civil (54). 49,976 horas de capacitación.

y desocupados de la zonas de 

/ Cañete – Lima; Puquio – Ayacu-

influencia.

cho y Chincha – Ica

99

 
Talleres de Capacitación Laboral “ Enchapados de cerámicos” 912 

Jóvenes de la comunidad 

Tinyahuarco – Pasco

horas de capacitación

campesina de Santa Rosa de 

Colquijirca y del Centro Poblado 

de Colquijirca.

Talleres de Capacitación Laboral “ Reparaciones básicas de 

Jóvenes de las Comunidades 

Tinyahuarco – Pasco

Instalaciones Sanitarias” 1,104 horas de capacitación

Campesinas de Santa Rosa de 

Colquijirca, Smelter, Villa Pasco y 

Centro Poblado de Colquijirca.

Talleres de capacitación Laboral “Construcción de Cocinas 

Comunidades: La Granja, La Ira-

Chota – Cajamarca

Mejoradas”. 13,120 horas de capacitación

ca, Paraguay, La Pampa – CHOTA 

CAJAMARCA

Talleres de Capacitación Laboral “Curso Básico de Instalaciones 

Alumnos del 5to año de Secun-

Lurín – Lima

Eléctricas Domiciliarias”. 1,200 horas de capacitación

daria de la Institución “Educativa 

Nacional Miguel Grau Semina-

rio”– Asociación de Vivienda Los 

claveles,Distrito de Lurín

Talleres de Capacitación Laboral “Curso Básico de Instalaciones 

Alumnos del 5to año de Secun-

Lurín – Lima

Eléctricas Domiciliarias”. 1,200 horas de capacitación

daria de la Institución “Educativa 

Nacional Miguel Grau Semina-

rio”– Asociación de Vivienda Los 

claveles,Distrito de Lurín

Talleres de Capacitación Laboral “Instalaciones de agua y 

Comunidades: La Granja, La 

Chota – Cajamarca

alcantarillado”. 4,480 horas de capacitación

Iraca, El Sauce, Paraguay, La 

Pampa – CHOTA CAJAMARCA

Talleres de Capacitación Laboral “Mantenimiento Básico de 

Jóvenes de las comunidades 

Tinyahuarco – Pasco

Instalaciones Eléctricas” 960 horas de capacitación.

Campesinas de Santa Rosa de 

Colquijirca, Smelter y CP de 

Colqujirca.

Talleres de Capacitación Laboral en alianza con la ONG Servicios 

Jóvenes de El Agustino, de 18 a 

El Agustino – Lima

Educativos de El Agustino. 4,680 horas de capacitación.

29 años

100

Talleres de Comunicación e integración para los docentes y perso-

Colegio Juana Alarco de Dan-

Miraflores – Lima

nal del Colegio Juana Alarco de Danmert.

mert

Asistencia social a pobladores de Talara a través de la gestión de la 

Pobladores en extrema pobreza

Talara – Piura

Gobernación

Campañas de salud: Vacunación gratuita contra la Hepatitis B; 

Centros Educativos de San 

Cañete – Lima y Chincha – Ica

Obstetricia, higiene bucal y medicina general

Vicente de Cañete y Comunidad 

en general

Chalas a dirigentes vecinales sobre características de los proyec-

Dirigentes de la Mesa de Con-

Lurín – Lima y Puquio – Ayacucho

tos: NASA UNIQUE; Corredor Vial Interoceánico

certación, Dirigentes Territoria-

les del Distrito de Lurín-Zona 

A,Dirigentas de las OSB y Coor-

dinadores de los Municipios

Charlas sobre cuidado del Medio Ambiente; organización de 

Escolares de secundaria del 

Tinyahuarco – Pasco; San Juan 

grupos de trabajo para limpiar el cauce de una torrenta cercana y 

Colegio Jose Carlos Mariátegui 

de Marcona – Nasca y Urcos – 

segregación de residuos sólidos

de Colquijirca y Instituciones 

Cusco.

educativas cercanas a la carrete-

ra San Juan de Marcona (Nasca) 

/ Urcos (Cusco)

Programa de capacitación: Mujeres Andinas Emprendedoras: 

Esposas de Colaboradores 

Tarma – Junín

Tejido.

que viven en las localidades de 

Condorcocha

Proyecto Integral en conjunto con COLP, CB&I, COSAPI y APC para 

Comedores Populares de 

Cañete – Lima y Chincha – Ica

capacitar a los comedores populares.

Chincha

Talleres de actitud para el cambio, autoestima y desarrollo personal 

Miembros de la comunidad de 

Tarma – Junín

y familiar, herramienta: metodología de la dramatización e intercam-

Condorcocha y Carpapata

bio de roles.

Apoyo a profesores (03) de colegios en Los Organos para su capa-

Profesores de colegios naciona-

Los Órganos – Piura

citación en la UDEP.

les en Los Órganos

Apoyo a viaje de promoción de Colegio de Comunidad Willoq 

Promoción 2007 Institución 

Miraflores – Lima

(Visita Museo de Oro y almuerzo en Larcomar)

Educativa #501617

101

Apoyo con material para infraestructura educativa y programas de 

Centro Educativo Ciro Guevara 

Chota – Cajamarca; El Agustino 

alfabetización

Perez – La Granja – Chota – 

– Lima

Cajamarca; Comedor Popular 

A.H. Ancieta Alta

Apoyo con útiles escolares a comunidades

Centros Educativos de 

Tinyahuarco – Pasco; Tanta – 

Comunidades Campesinas de: 

Lima y Chota – Cajamarca

Colquijirca, Smelter, Villa Pasco, 

Huaraucaca, Racracancha; CP 

de Colquijirca; Tanta y La Granja

Campaña: “Dona un juguete y harás sonreír a un niño” (Donantes: 

Niños Hospitalizados del Hospital 

Breña – Lima

Trabajadores GMI),

del Niño

Concurso escolar de afiches y slogans, teniendo como tema 

Centros Educativos Nacionales 

Cañete – Lima

central “El Reciclaje”.

de San Vicente – Cañete

Construcción de un muro de contención de concreto; loza 

Pobladores de Independencia; 

Independencia/San Juan de 

deportiva; plataforma para áreas verdes; parque infantil y escalera 

Ganímedes; A.H. La Planicie y 

Lurigancho – Lima

para A.H.

A.H. Juan Pablo II

Coordinación de compras con proveedores locales en Chincha y 

Comunidades de Chincha y 

Cañete – Lima y Chincha – Ica

Cañete

Cañete

Donación de Departamento en Proyecto Parques del Agustino para 

Clínica San Juan de Dios

A nivel Nacional

ser sorteado en Teletón 2008. El monto recaudado en alianza con 

Claro y el Fondo de Vivienda fue de: S/.220,000 aproximadamente.

Mejoras en la infraestructura de: Escuela de Chota; Local Pronei y 

Escolares de Chota; 

Chota/Paraguay – Cajamarca

Parroquia de la comunidad La Granja.

Comunidades de La Palma 

– Paraguay – Cajamarca y 

Comunidad La Granja

Realización de (02) dos funciones de cine para implementar sala de 

Colegio Juana Alarco de 

Miraflores – Lima

computo – Programa Adopta una Escuela.

Danmert

102

Sembrado de 143 arbolitos en Proyecto Parques del Agustino 

Pobladores que residirán en el 

El Agustino – Lima

realizado por los trabajadores de GyM S.A.

Conjunto Habitacional Parques 

del Agustino

Apoyo económico y con materiales diversos a entidades u 

Centros Educativos de 

Tinyahuarco – Pasco; El Agustino 

organizaciones comunitarias.

Colquijirca; Pequeñas 

/ Tanta – Lima y Querocoto – 

empresas de A.H. 2 de Mayo; 

Cajamarca

Centro Victoria; Mypes de 

metalmecánica El Agustino, 

Pobladores del distrito de Tanta, 

del Pueblo de Mancora, del A.H. 

Los Alamos y Querocoto.

Apoyo con maquinaria pesada para la nivelación de terrenos de 

Colegios de las comunidades 

Tinyahuarco – Pasco

centros educativos

campesinas Santa Rosa de 

Colquijirca, Smelter y Villa Pasco

Apoyo con utensilios e implementos para el programas Vaso de 

Niños y madres del Pueblo 

Los Órganos – Piura; Negrito – 

Leche

Nuevo Los Órganos y Distrito de 

Piura

Negritos

Shows infantil navideños, chocolatadas y entrega de juguetes en 

Niños de 0 a 12 años de edad del 

Cañete; Talara; Salaverry; 

comunidades

Pueblos de Huacapuquio; Talara; 

Chimbote; Supe; Pisco, Mollendo, 

zonas de influencia de Consorcio 

Cusco, Ilo; Eten, Lima y Cerro de 

Terminales y Colquijirca – Cerro 

Pasco

de Pasco

103

Iniciativa

Estado

Grupo Objetivo

Lugar

Beneficiario directo

Proyectos especiales

Asistencia técnica en un estudio preliminar y 

Información levantada para 

Un total de 1881 

Región La Libertad, 

elaboración del informe respectivo para la evaluación 

03 centros educativos e 

alumnos

de un proyecto de apoyo social en infraestructura 

informe presentado sobre 

educativa. Trabajo realizado en coordinación con “Cia. 

necesidades de inversión.

Provincia y distrito de 

Santiago de Chuco.

Minera Barrick Misquichilca S. A.” en el distrito de 

Santiago de Chuco. 

Asistencia técnica en la revisión del expediente 

Informe presentado

Beneficiarios 13,273 

Región Arequipa, 

técnico “Mejoramiento y Ampliación de las Redes 

de Agua Potable y Alcantarillado “ elaborado por la 

Municipalidad del distrito de Orcopampa – Arequipa. 

Trabajo realizado en coordinación con Cía. Minera 

Buenaventura:

habitantes

distrito de Orcopampa.

Asistencia técnica en un estudio preliminar y 

Informe presentado

elaboración del informe respectivo para la evaluación 

de un proyecto de apoyo social en rehabilitación de 

infraestructura de riego comunal en Cañete y Chincha. 

Trabajo realizado en coordinación con Perú LNG. 

Beneficiarios 

 500 familias

Región Lima – Cañete 

y Región Ica – 

Chincha.

Asistencia técnica en el análisis de una base de 

Informe presentado

Un estimado de 350 

Región Ayacucho y 

datos sobre Instituciones Educativas factibles de 

recibir apoyo para la mejora del servicio educativo en 

las Regiones de Ayacucho y Huancavelica. Trabajo 

realizado en coordinación con Perú LNG.

Asesoría a SURVIAL en la coordinación con 

autoridades locales del distrito de Puquio a efectos de 

evaluar las posibilidades de ofrecer asistencia técnica 

en la realización de estudios de pre-inversión a nivel de 

perfil para un hospital local. 

alumnos

Huancavelica

Población adscrita 

Región Ayacucho, 

según MINSA

Provincia de Lucanas, 

distrito de Puquio.

104

Asistencia técnica en la etapa de pre-inversión: 

Se aprobó la viabilidad 

Área a beneficiar: 

Distrito de Miraflores 

1.PASO I: Se apoyo en la gestión del pase de nivel perfil 

del estudio de factibilidad 

95 ha., de 1,923 lotes 

en la provincia de 

a nivel Factibilidad del estudio del distrito de Miraflores 

donde culmina la etapa 

existentes.

Arequipa

en Arequipa, coordinándose con el Ministerio de 

de pre-inversión. La 

7,692 habitantes para 

Economía y Finanzas, Gobierno Regional y Gobierno 

Municipalidad emprenderá 

el 2009 y 11,497 para el 

Local.

la etapa de inversión, 

año 2029 (horizonte del 

2.PASO II: Se brindó Asistencia Técnica permanente en 

desarrollando el expediente 

proyecto)

el desarrollo del estudio de Factibilidad “Instalación de 

técnico.

Redes Primarias y Secundarias del Sistema de Agua 

Potable y Alcantarillado de los Pueblos Jóvenes de las 

Partes Altas del distrito de Miraflores – Provincia de 

Arequipa.

3.PASO III: Se apoyó en la gestión de viabilidad del 

estudio de factibilidad de Miraflores ante el Gobierno 

Regional de Arequipa.

Asistencia técnica en la etapa de pre-inversión:

Estudio de factibilidad 

Área a beneficiar: 306 

Distrito de Miraflores 

1.PASO I: Se apoyo en la gestión de nivel de perfil a 

concluido. La Municipalidad 

ha., de 4,638 lotes 

en la provincia de 

nivel Factibilidad del estudio del distrito de Mariano 

gestiona el otorgamiento 

existentes.

Arequipa

Melgar en Arequipa, coordinándose con el Ministerio de 

de la viabilidad y con ello 

23,190 habitantes para 

Miraflores – Arequipa

Economía y Finanzas, Gobierno Regional y Gobierno 

iniciar el desarrollo del 

el 2009 y 28,184 para el 

Local.

expediente técnico de la 

año 2029 

2.PASO II: Se brindó Asistencia Técnica permanente en 

etapa de inversión.

el desarrollo del estudio de Factibilidad “Instalación de 

Redes Primarias y Secundarias del Sistema de Agua 

Potable y Alcantarillado de las Partes Altas del distrito 

de Mariano Melgar – Provincia de Arequipa.

105

 
106

CORPORATE  
GOVERNANCE

Corporate Governance

110

107

108

109

Corporate Governance

Continuing with our effort to consolidate the best corporate 
governance practices, in the year 2008 Graña y Montero participated 
in the Good Corporate Governance Index which the Lima Stock 
Exchange published for the first time, with the participation of only 7 
companies. Our inclusion was the result of the evaluation of our good 
governance practices by an external auditor previously approved by 
the Lima Stock Exchange.

Continuing with our effort to consolidate the best corporate governance practices, in the year 2008 Graña y Montero participated in the 

Good Corporate Governance Index which the Lima Stock Exchange published for the first time, with the participation of only 7 companies. 

Our inclusion was the result of the evaluation of our good governance practices by an external auditor previously approved by the Lima 

Stock Exchange.

The Board of Directors’ committees were strengthened this year, encouraging the participation of the Independent External Directors and 

reducing the participation of the Internal Directors. The Audit and Process Committee held 3 meetings this year, the Investment and Risk 

Committee had 5 meetings, and the Human Resource Management and Social Responsibility Committee met twice in 2008. 

The Shareholder Service Office handled 42 inquiries from shareholders and potential investors in 2008 and the company, in line with the 

launch of our new image, redesigned the website, incorporating more useful information for the shareholders and investors.

For the third time, Graña y Montero S.A.A., as well as our subsidiaries, underwent a Self Assessment of the Board of Directors. As part of 

the process of becoming familiar with the business in the field, our directors visited the Parques del Agustino construction project and the 

new Gas Plant in Talara.

As of December 31, 2008, we had 865 shareholders, of which approximately 13.25% own less than 1% of the capital stock. Nearly 30.29% 

own between 1 and 5% of the capital stock. 

110

1

4

7

2

5

8

3

6

9

1 José Graña Miró Quesada

President 

2 Carlos Montero Graña

Vice President 

3 Mario Alvarado Pflucker

Internal Director –

General manager 

4 Teodoro Harmsen Gómez 

de la Torre

External Director 

5 Roberto Abusada Salah 

Independent External Director 

6 Jean Louis Dupoirieux

External Director 

7 José Chlimper Ackerman

Independent External Director 

8 Augusto Baertl Montori

Independent External Director 

9 Hernando Graña Acuña

Internal Director

In March of 2008, the General Assembly of Shareholders elected the Board of Directors for the 2008–2010 period, maintaining five external 

directors among its members. Of these five, 3 are independent external directors; that is, they do not have a significant number of shares 

in the company. 

111

 
 
 
 
 
 
 
 
 
Directorio

José Graña Miró Quesada

President of the Board of Directors and an architect by profession. Additionally he is the President of the Board of Directors of the subsidiaries 

GyM, GMP, GMD, CONCAR, and LARCOMAR, as well as Vice President of the Board of Directors of GMI. He is also a director of Empresa 

Editora El Comercio S.A. and Relapasa. 

Carlos Montero Graña

Vice President of the Board of Directors and a civil engineer by profession. Additionally, he is the Vice President of the Board of Directors of 

GyM, Vice President of the Board of Directors of GMP and a director of GMD, GMI and CONCAR.

Mario Alvarado Pflucker

Director and General Manager. Civil Engineer with a master’s degree in Business Administration from George Washington University, U.S.A. 

Currently, he is also a director of GMD, GMI, GyM, GMP, CONCAR, Larcomar, Norvial and América Leasing.

Teodoro E. Harmsen Gómez de la Torre

Director and a civil engineer by profession. President of GMI S.A. and a director of Wagonlits and MDI. Professor emeritus at the PUCP 

School of Science and Engineering. He is also an honorary member of the American Concrete Institute, among other distinctions.

Roberto Abusada Salah

Director, with a PhD in Economics (Cornell, U.S.A.). He is a director of GMD, CONCAR, Mauricio Hothschild y Cía. Ltda. S.A.C. and the Peruvian 

Institute of Economics (IPE).

112

Jean-Louis Dupoirieux

Director and a civil engineer by profession. He is a Project Director at Vinci-Construction Grands Projets (France) and also a director of GyM 

and Sociedad Concesionaria Puente de Chiloe (Chile).

José Chlimper Ackerman

Director. He has a degree in Economics and Business Administration from North Carolina State University and holds the position of President 

of the Board of Directors of Corporación Drokasa and Sociedad Agrícola Drokasa, where he is also the CEO. Director of Maestro Home 

Center, Banco Central de Reserva del Peru and Aeropuertos del Peru. Additionally he is a director of GMD.

Augusto Baertl Montori

He is a mining engineer by profession and the Executive President of Gestora de Negocios e Investments S.A. and IMA Latin America Inc. 

Additionally, he is the President of the Board of Directors of Agrícola Chapi S.A. and a director of Alturas Minerals, Norsemont, Interbank, 

GMP and FIMA.

Hernando Graña Acuña

Director, industrial engineer with a post graduate degree in Mining Engineering from the University of Minnesota, U.S.A.. He is a director of 

GyM, GMI, GMP, Ecotec S.A. and CONCAR. President of Norvial S.A. He is also a director of CAPECO and TGP.

113

Board of Directors’ Committees 

Auditing and Processes 

Human Resources Management and 

Investment and Risk Committee 

Committee 

Social responsibility Committee

Composed of 

Augusto Baertl Montori 

José Graña Miró Quesada

Roberto Abusada Salah

Chairman

Chairman

Composed of

Composed of

Chairman

Jean Louis Dupoirieux

José Chlimper Ackerman

Steering committee 

José Chlimper Ackerman

Augusto Baertl Montori

Roberto Abusada Salah

Teodoro Harmsen Gómez de la Torre

The Steering committee responsible for the Group’s coordination is composed of the 4 Executive Directors and 7 General Managers of 

companies in the Group.

José Graña Miró Quesada 

Carlos Montero Graña 

Hernando Graña Acuña 

Mario Alvarado Pflucker 

Juan Manuel Lámbarri 

Francisco Dulanto Swayne 

Jaime Dasso Botto 

President

Vice President

Director

Managing Director

General Manager GyM 

General Manager GMP

General Manager GMD

Walter Silva Santisteban Requejo 

General Manager GMI

Jaime Targarona Arata 

Rolando Ponce Vergara 

General Manager CONCAR

General Manager GMV

Antonio Rodríguez Canales 

General Manager LARCOMAR

114

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Senior Executives

Mario Alvarado Pflucker

Corporate General Manager from 1997 to the present. Obtained a bachelor’s degree in Civil Engineering from Universidad Ricardo Palma 

and a master’s degree in Engineering Administration, specializing in Construction Management, from George Washington University, U.S.A. 

Currently, he is also a director of GMD, GMI, GyM, GMP, CONCAR, Larcomar, Norvial and América Leasing.

Juan Manuel Lámbarri Hierro

General Manager of GyM from 2001 to the present. Civil Engineer graduated from Pontificia Universidad Católica del Perú and Senior Man-

agement Program (Spanish acronym: PAD) at Universidad de Piura. He began working for Graña y Montero in 1982 and currently, he is also 

a director of GyM.

Hernando Graña Acuña

GyM director and executive. Industrial Engineer with a post graduate degree in Mining Engineering from the University of Minnesota, U.S.A. 

He is a director of GyM, GMI, GMP, Ecotec S.A. and CONCAR. President of Norvial S.A. He is also a director of CAPECO and TGP. 

Francisco Dulanto Swayne

General Manager of GMP S.A. since it was founded in 1984 and a director since 1988. Studies at Universidad Nacional de Ingeniería (Na-

tional Engineering University), ESAN, PAD Universidad de Piura. He has been working for the Graña y Montero Group since 1974. He is also 

a director of Consorcio Terminales and CLHB (Bolivia). He was the President of SPE (Society of Petroleum Engineers), Lima Section, in 1991 

and Director of the Sociedad Nacional de Minería, Petróleo y Energía (the National Society of Mining, Petroleum and Energy) from 1993-1994 

and 2005-2006.

Jaime Dasso Botto

General Manager of GMD from 2000 to the present. He obtained a bachelor’s degree in Electronic Engineering and a master’s degree in 

Software Development from Stevens Institute of Technology, U.S.A. He was the Commercial Manager of GMD from 1994 to1999. Currently, he 

is also a director of GMD.

115

Walter Silva Santisteban Requejo

General Manager of GMI from 1998 to 2005 and Managing Director from 2006 to the present. He obtained a bachelor’s degree in Civil Engi-

neering from Universidad Nacional de Ingeniería (National Engineering University). Currently, he is also a director of ECOTEC.

Jaime Targarona Arata

General Manager of CONCAR since August of 2005. Civil Engineer graduated from Universidad Autónoma de Guadalajara, with an MBA from 

Universidad San Ignacio de Loyola. He has also held the position of Civil Engineer on different projects, Commercial Manager of the GyM 

Special Projects Division and General Manager of Graña y Montero Mexico.

Rolando Ponce Vergara

General Manager of GMV since October of 2008. Previously, he held the position of Manager of the Real Estate Division. He has worked for 

the Group since the year 1993. He is a Civil Engineer by profession, with a degree from Universidad Ricardo Palma and a master’s degree in 

Construction and Real Estate Business Management from Pontificia Universidad Católica de Chile-Politécnica de Madrid.

Luis Díaz Olivero

Corporate Finance Manager since December 15, 2004. Industrial Engineer graduated from Pontificia Universidad Católica, with an MBA from 

the University of Pittsburgh. Since joining the Group in 1993, he has also been the Finance Manager of GMP S.A from 1998 to 2000 and the 

Finance Manager of GyM from 2001 to 2004.

Miguel Valentín Ghezzi

Business  development  Manager  since  October  of  2006.  He  has  a  degree  in  Business Administration  from  Universidad  del  Pacífico  and 

an MBA from Harvard Business School. He has been with the Group since November of 2004. He is a director of CONCAR, Survial and 

Larcomar. Previously, he worked for Citibank in the Corporate Finance Area and was a consultant with McKinsey & Company in Madrid.

César Neyra Rodriguez

Manager of Internal Auditing and Management Processes. He has a bachelor’s degree in Accounting from Universidad Nacional Federico 

Villarreal and a master’s degree in Business Administration and Finance from Universidad del Pacífico. He has also studied Quality Improve-

ment Systems and graduated from the Six Sigma Methodology program at Caterpillar University in Mexico and the U.S.A.

116

Claudia Drago Morante

Corporate Legal Manager from 2000 to the present. Attorney graduated from the University of Lima. PADE in Finance and Corporate Law from 

ESAN. She was the Legal Advisor to GMD from 1997 to 2000.

Juan José Arrieta Ocampo

Manager of Human Resources Management and Social Responsibility since November of 2007. Bachelor’s degree in Sociology from 

Pontificia Universidad Católica. PADE in Business Administration from ESAN. He was the Human Resources Manager at GyM from 1999 

through October 2007.

Kinship

Mr. José Graña Miró Quesada, President of the Board of Directors, has first degree kinship with Mr. Miguel Valentín Ghezzi, a director of Con-

car and Larcomar and Business Development Manager at Graña y Montero, third degree kinship with Ms. Yamile Brahim Graña, shareholder 

of the company, and fourth degree kinship with the director, Mr. Hernando Graña Acuña. Lastly, Mr. Teodoro Hans Harmsen Andress, a director 

of GMP, has first degree kinship with Mr. Teodoro Harmsen Gomez De La Torre, a director of the company.

Company Name

In a corporate split-off from Investments Graña y Montero S.A., Graña y Montero S.A.A. was incorporated by public deed on August 12, 1996 

and registered on card 131617 and electronic record 11028652 in the Registry of Legal Entities of Lima.

Capital

The capital of the company as of December 31, 2008 amounted to S/.390,798,933.00, represented by 558,284,190 shares with a nominal value 

of S/. 0.70 each as a result of an increase in capital stock agreed upon by the General Assembly of Shareholders on March 31, 2008. 

117

Principales Accionistas

El principal accionista es GH Holding Group, representada por José Graña Miro Quesada, Presidente del Directorio.

Relación de Principales Accionistas al 31.12 . 2008

Nombres y apellidos

Numero De Acciones

Participacion (%)

Nacionalidad

GH Holding Group

AFP Integra (ING GROUP)*

Prima AFP (Grupo Crédito) *

117,538,227

66,312,888 

66,130,519 

AFP Horizonte (Grupo BBVA)*

51,154,671

Profuturo AFP (Grupo Citibank)*

38,771,698 

Bethel Enterprises S.A.

33,986,024

Vinci Construction (Grupo Vinci)

32,825,259

Byron Development

24,040,669

Genesis Smaller Companies SICAV

22,090,451

Subtotal

Otros Accionistas

Total

206,439,961

351,844,229

558,284,190

* Sumatoria de los Fondos 1,2 y 3

21.05%

11.88%

11.85%

9.16%

6.94%

6.09%

5.88%

4.31%

3.96%

81.12%

18.88%

100.00%

Panamá

Perú

Perú

Perú

Perú

Panamá

Francia

Panamá

Luxemburgo

118

 
 
 
Tenencia

Menor a 1%

 Entre 1% - 5%

 Entre 5% - 10%

 Mayor al 10%

 Total

Social purpose

Número de Accionistas 

Porcentaje de participación al 31.12.08

848

10

6

1 

865 

13.25% 

30.29% 

35.41% 

21.05% 

100.00% 

The company’s main objective is to dedicate its efforts toward investments and mercantile operations in general, as well as engineering 

services,  management  consultancy,  real  estate  investments,  and  the  acquisition,  transfer  and  negotiation  of  shares  of  companies  and 

other securities. 

CIIU – 6719

Duration of the Company

Graña y Montero S.A.A. was incorporated for an indefinite period of time.

Changes in Shares

The  stock  market  quotation  was  S/.5.61  per  share  in  January  and  S/.  2.00  per  share  on  December  31,  partially  due  to  the  issuance  of 

130,060,057 paid-up shares. The average liquidity during the period was 83.47 % and the volume traded during the year totaled S/.83,567,324. 

In the month of April, dividends in the amount of S/. 25.9 MM were distributed.

119

Cotizacion mensual de acciones

Codigo ISIN

Nemonico

Año - Mes

Apert. S/.

Cierre S/. Max. S/.

Min. S/.

Prom. S/.

Cotizaciones 2008

Precio

PEP736581005

GRAMONC1

PEP736581006

GRAMONC1

PEP736581007

GRAMONC1

PEP736581008

GRAMONC1

PEP736581009

GRAMONC1

PEP736581010

GRAMONC1

PEP736581011

GRAMONC1

PEP736581012

GRAMONC1

PEP736581013

GRAMONC1

PEP736581014

GRAMONC1

PEP736581015

GRAMONC1

PEP736581016

GRAMONC1

2008-01

2008-02

2008-03

2008-04

2008-05

2008-06

2008-07

2008-08

2008-09

2008-10

2008-11

2008-12

6.00

5.63

5.92

6.15

6.25

7.06

5.00

4.67

4.30

3.60

2.99

2.10

5.61

5.92

6.15

6.25

7.05

5.40

4.67

4.30

3.63

2.99

2.10

2.00

6.10

5.95

6.20

6.40

7.05

7.13

5.00

4.67

4.35

3.60

2.99

2.15

5.40

5.60

5.92

6.06

6.25

5.40

4.67

4.29

3.50

2.96

2.01

2.00

5.75

5.90

6.08

6.21

6.73

5.64

4.93

4.43

3.86

3.10

2.02

2.07

Volumen de negociado GRAMONC 1

Vol. Neg. US$

Precio cierre

Emisiones de acciones 
liberadas 03 junio

8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00

ene

feb

mar

abr

may

jun

jul

ago

sep

oct

nov

dic

18,000,000

16,000,000

14,000,000

12,000,000

10,000,000

8,000,000

6,000,000

4,000,000

2,000,000

-

120

Bonos de Titulización

En octubre 2003 la empresa y sus principales subsidiarias colocaron Bonos Titulizados con garantía parcial del BID y el FMO por un monto 

de US$ 50 millones, con amortizaciones semianuales con vencimiento en Setiembre 2011. Al cierre de Diciembre 2008 dichos bonos tienen 

un saldo de S/. 73,390,836 (US$ 23,4 MM). En el año 2006, la empresa obtuvo la aprobación de la Junta de Bonistas y los Garantes para 

reducir los niveles de garantía del BID y el FMO, liberar la cuenta de reserva y flexibilizar ciertas condiciones en la estructura de los Bonos 

que  generaban  ineficiencias  operativas  y  tributarias.  Estas  modificaciones  no  afectan  la  clasificación  de  los  mismos  manteniéndose  el 

rating en AAA.

Codigo Isin

Nemonico

Corto Plazo

Apert %

Cierre %

Max %

Min %

Prom %

PEP80070F083

INTE0BTG1U

Bonos de Titulización 

102.20%

100.00%

102.20%

97.02%

101.03%

Instrumentos Corto Plazo Cotizaciones 2008

Precio

Instrumentos de Corto Plazo

En Noviembre 2008 se renovó la línea de instrumentos de corto plazo en el mercado de capitales por US$ 20 millones durante un período 

de dos años adicionales. Al 31 de diciembre 2008, la empresa tiene vigente dos emisiones, cada una por US$ 7MM con vencimiento en Julio 

y Noviembre 2009.

121

  
  
 
 
  
 
122

ANALYSIS  
OF RESULTS

Informe del Análisis de la Administración

126

123

124

Analysis of Results

Summary

Results as of December 31, 2008 (audited figures)

• By the year-end closing, activity had increased 23.4% compared to the preceding year, amounting to S/. 1,887.7 MM (US$ 600.8 MM). 

• EBITDA in 2008 reached S/.372.7 MM (US$ 118.6 MM), which represents growth of 30.3% compared to the preceding year and  

is equivalent to 19.7% of the activity. 

• Available  Earnings  at  the  2008  closing  amounted  to  S/.147.2  MM  (US$  46.8  MM),  which  represents  growth  of 13.3%  compared  

to the preceding year.

• Debt / EBITDA (1) closed the period at 1.2x (14.2 months) compared to a debt duration of 27 months.

• The consolidated backlog at the 2008 year-end closing amounted to S/. 2,607.2 MM (US$ 829.7 MM), which represents growth  

of 20.8% compared to the 2007 year-end closing.

• Gross Capital Investment during the 2008 period was S/. 315.1 MM (US$ 100.3 MM). 

Principales Cifras Consolidadas Acumuladas (En miles de nuevos soles) 

Actividad

Facturación

Utilidad Bruta

2007 / 4 

1,529,818

1,439,974

299,027

Utilidad Operativa

220,013

Utilidad Realizada 

194,773

Utilidad Disponible

129,900

UAIPIDA (1)

286,608

100.0%

94.1%

19.5%

14.4%

13.0%

8.6%

18.7%

 (1) Utilidad Operativa + Depreciación + Amortización

2008/4

1,887,723

1,827,710

399,490

294,936

277,128

147,189

372,696

100.0%

96.8%

21.2%

15.6%

14.7%

7.8%

19.7%

4t’08 / 4t’07

23.4%

26.9%

33.6%

34.1%

39.4%

13.3%

30.0%

126

 
Profits and Losses

The consolidated activity of the Graña y Montero Group at year-end closing had grown 23.4% compared to the preceding year, amounting 

to S/. 1,887.7 MM. Growth in the activity during 2008 is accounted for by growth in the Infrastructure and Construction Business, which grew 

S/. 292.5 MM (+26.2%), the Engineering Business S/. 45.2 MM (+64.6%), the Petroleum Business S/.39.6 MM (+22.4%), the Concession 

and Concession Operation Business S/. 34.9 MM (+77.0%), the Information Technology Business S/. 19.0 MM (+19.8%) and the Larcomar 

Business which grew S/ 2.7 MM (+10.2%) respectively.

The activity of the Infrastructure and Construction Business reached S/. 1,408.5 MM (US$ 448.3 MM). The major contracts executed during 

the year 2008 were the Expansion of the Malvinas Plant, the construction of the Cerro Corona mining project, the modernization of the 

Pariñas plant, the construction of Sections 2 and 3 of the Southern Interoceanic Highway, the highway maintenance work in Lot IAB, the 

Paucarcocha Dam, the contract on hauling material for the El Brocal mine and the work on camps, underground work, tank foundations and 

civil works at the new NGL plant in Chilca. The Golf Milenium, Balta 1070, Parques del Agustino and Golf Los Incas real estate projects are 

those with the most activity in the Real Estate Division, while the construction of the Héroes Navales Station, the office building on Santo 

Toribio for Inserfinsa, the construction of the Westin Hotel and Novotel in San Isidro are the main projects of the Building Division. 

The Petroleum Business activity in 2008 closed at S/. 216.6 MM (US$ 68.9). The activity of the Exploration – Production line showed the most 

growth given that it benefited from the higher crude price, as well as increased production due to the drilling of ten new wells in Lots I and 

V. The activity of this line represented 45.1% of the total activity of the Petroleum Business. The activity of the Gas Plant intensified due to 

greater demand for gas from EEPSA, as well as higher prices for derivatives obtained as a result of the fractionation process. This plant’s 

activity accounts for 27.9% of the activity of this business. Lastly, the Fuel Storage and Dispatch line showed increased activity due to greater 

consumption generated by the growth in the country’s economy, which resulted in greater demand for energy and hydrocarbons. This line 

accounted for 27.0% of the activity of this business.

127

The activity of the Engineering Business amounted to S/.113.2 MM (US$ 36.0 MM). The growth of this business in 2008 occurred due to ro-

bustness in the first three quarters in relation with the framework contracts with Río Tinto, Antamina, Minera Yanacocha, Repsol and Pluspet-

rol. Mention should also be made of the Construction Management at the La Granja Camp for Rio Tinto and the Engineering for the Dorado 

Pipeline in Lot 67 for Perenco. In the Dominican Republic, the Hotel Moon Palace Supervision Project was rolled out and the supervision of 

the Hotel Club Melia Paradisus project, as well as other projects for the Sol Melia chain, were concluded.

In  the  Information Technology  Business,  the  activity  for  2008  amounted  to  S/. 115.0  MM  (US$  36.6  MM). The Technology  and Technology 

Services line accounts for the growth of this business, with the start up of operations at the CONSUCODE computer centers. Its activity rep-

resented 42.9% of the total activity of this business. The Technology Outsourcing and Software Factory lines represented 24.6% and 25.1% of 

the activity respectively, while the Business Process Outsourcing line accounts for the balance of the activity for the period.

The  combined  activity  of  the  Highway  Concession  Business  and  the  Highway  Operation  and  Maintenance  Business  conducted  in  2008 

reached S/. 80.2 MM (US$ 25.5 MM). In concessions, the activity of the concession for Section 1 of the Southern Interoceanic Highway ac-

counts for the growth of the business and represents 24.7% of the total activity, while Highway Operation and Maintenance with its Conces-

sion Contract on the Operation of the Paita – Yurimaguas Highway, the Operation and Maintenance of Road Network No. 5 for Norvial and the 

Tacna Road Maintenance Contract represented 75.3% of the activity.

During the year 2008, greater sales among Larcomar operators resulted in an improvement in the variable annual income from the Shopping 

and Entertainment Center. The activity reported at the end of the period was S/. 29.3 MM (US$ 9.3 MM).

There was record activity in the fourth quarter for the second consecutive time, amounting to S/.543.7MM (US$ 173.1MM). Intercompany ser-

vices also set a record of S/. 105.9 MM (US$ 33.7 MM) due to the construction contract on the new gas plant in Pariñas. Lastly, at the closing 

of the quarter, 62.5% of the activity was the result of contracts related to the mining, petroleum and energy sectors. 

• Gross Profit rose 33.6% (27.4% in US$) compared to the preceding year, amounting to S/. 399.5 MM (US$ 127.1 MM), which accounts for 

21.1%  of  the  activity.  Gross  Profit  for  the  year  2008  is  composed  of  Gross  Profit  from  the  Infrastructure  and  Construction  Business  that 

amounted to S/. 209.4 MM (US$ 66.7 MM), Gross Profit from the Petroleum Business totaling S/. 105.4 MM (US$ 33.6 MM) and Gross Profit 

128

Actividad Anual Consolidada (S/.000’s)

1,888

1,321

1,530

932

1,800

1,550

1,300

1,050

800
550
300
50

2,005

2,006

2,007

2,008

from the Engineering Business, which amounted to S/. 30.7 MM (US$ 9.8 MM). The other three types of business account for the balance 

of the Gross Profits (33.6 MM) y por la Utilidad Bruta del Negocio de Ingeniería que alcanzó los S/. 30.7 MM (US$ 9.8 MM). Los otros tres 

negocios completan el saldo de la Utilidad Bruta.

Actividad por negocio

Utilidad bruta

Infraestructura y construción

Tecnología de Informac.

Infraest. y Const.

Otros

Ingeniería de Consulta

Servicios Petroleros

Operac. de Conseciones

Larcomar

71.8%

5.8%

4.1%

5.9%

11.0%

1.5%

47.66%

52.34%

129

Gross Profits from the Infrastructure and Construction Business in 2008 rose 36.3% compared to the previous year. The increase in Gross 

Profit is mainly due to a larger Gross Margin for the projects and appreciation of the United States dollar that has a favorable impact on the 

relation between income and costs in this business. At the 2008 closing, the Gross Margin for this business was 14.8%.

Gross Profit from the Petroleum Business rose 30.6% due to the increase in Gross Profit from Lots I and V that benefited from a higher crude 

price during the first three quarters of the year, which supported the production increase explained above. Additionally, the increase in Gross 

Profit from the Gas Plant as a consequence of the greater activity and higher price of derivatives accounts for the increase in the Gross Mar-

gin of this business, which reached 48.7%. Gross Profit from the Fuel Storage and Dispatch line was similar to that of the preceding year.

The higher Gross Profit from the Engineering Business is closely related to the growth in its activity. Gross Profit from this business rose 

59.3% in comparison with the preceding year and the Gross Margin reached 27.1%.

Gross Profit from the Information Technology Business amounted to S/. 19.8 MM (US$ 6.3 MM), while Gross Profit for the Concession and 

Concession-Operation Business was S/. 19.0 MM (US$ 6.6 MM) and Gross Profit from Larcomar amounted to S/.17.1 MM (US$ 5.4 MM).

• Operating Earnings increased 34.1% (27.9% in US$), totaling S/. 294.9 MM (US$ 93.9 MM), which results in an Operating 

Margin of 15.6%. The increase in Gross Profit supports this improvement in Operating Earnings. General expenses increased due to the 

higher level of activity, amounting to 5.5% of the same.

• Net financial expenses totaled S/. 32.3 MM (US$ 10.3MM), which accounts for an increase of 42.1% (34.0% in US$) com-

pared to 2007. The increase in Capital Investments and Working Capital needs as a result of greater activity explain the increase in Financial 

Debt. EBITDA also increased due to higher Operating Earnings and greater depreciation of Capital Investments, which has made it possible 

to absorb the higher financial expenses with no impact on their coverage that amounted to 11.6x, which is similar to the coverage at the 2007 

year-end closing.

130

• The cumulative effect of devaluation as of December 2008 was S/.44.1 MM. The devaluation is explained by a greater exposure 

to the United States dollar in the amount of S/. 24.8 MM as a result of an increase in Financial Debt and the expiration of forward contracts 

in the amount of S/ 19.3 MM. The impact of the forward contracts was mainly on the fourth quarter due to the increase in the exchange rate 

caused by the international financial crisis. However, as explained before, this increase also had a favorable impact on the group’s Gross 

Profit. The effects offset each other in terms of the period’s outcomes.

• Available Earnings grew 13.3% (8.1% in US$), amounting to S/. 147.2 MM (US$ 46.9 MM). The devaluation mentioned in the 

preceding paragraph is the factor that accounts for the fact that Available Earnings grew less than Operating Earnings. In 2007, this effect was 

positive, while in this period it is negative, increasing its impact on Final Net Income.

• Cumulative EBITDA1 in 2008 increased 30.0% (24.1% in US$), totaling S/. 372.7 MM (US$ 118.6 MM). The higher Operating 

Earnings combined with increased depreciation on the Group’s Capital Investments account for the increase in EBITDA, the consolidated 

total of which represents 19.7% of the group’s activity.

Long-term stable cash flows, such as those from highway concessions, petroleum services and the outsourcing business account for 43.2% 

of EBITDA1, resulting in coverage of 1.52x of the group’s total Financial Expenses plus General Expenses that are not related to these types 

of business. Additionally, it is assumed that the latter would not be cut back in the event of a total loss of its activity.

131

UAIPIDA por negocio

Infraestructura y construción

Tecnología de Informac.

Operac. de Conseciones

Servicios Petroleros

Ingeniería

Larcomar

29.16%

3.50%

4.27%

4.96%

3.77%

54.33%

Balance Sheet

• Compañía Logística de Hidrocarburos Boliviana (CLHB): As explained in previous reports, the state-owned company, Yacimientos 

Petroleros Fiscales Bolivianos, has taken control of CLHB’s operations without a transfer of its shares or payment of compensation for its 

nationalization. The negotiations to finalize this process continue, due to which there has been no need to record any expense in addition to 

that recorded in 2006. 

• Current liquidity at the end of the period was 1.25x. The pressure from Working Capital had an impact on this indicator. Although 

the figure was at a healthy level at the 2008 year-end closing, it has dropped 0.14x. The cash reserve to cover strategic investments under 

evaluation amounted to S/. 21.0 MM (US$ 6.7 MM) in December 2008.

• Financial Leverage was 0.74x while Total Leverage was 1.52x. Combined Capital Investments with a greater need for working 

132

capital have put pressure on Liabilities to Banks and Long-Term Debt. Taking into account that S/. 315.1 MM (US$ 100.3 MM) was invested 

during 2008, it should be mentioned that the Financial Debt related to these investments increased only US$ 29.0 MM. The balance of the 

increase in Financial Debt is US$ 21.0 MM, which is due to the working capital required by the revenue recognition method associated with 

the obtainment of CRPAO progress certificates at the beginning of the work on Section 1 of the Southern Interoceanic Highway and the Coast 

– Highlands Project: Buenos Aires Canchaque. As a consequence of the foregoing, the Financial Debt / Equity ratio increased 0.17x and the 

Total Leveraging ratio increased 0.13x compared to the 2007 year-end closing.

• Financial Debt / EBITDA (1) amounted to 1.2x at the 2008 closing. The increase in Financial Debt during the period surpassed the 

growth of EBITDA, with an indicator 0.24x higher at year-end. However, considering that the average debt expiration closed at 27 months, there 

is still a gap between this indicator and the debt payment period that allows adequate cash generation levels for the group. 

• Average Return on Equity at year-end closing for 2008 was 25.2%, while the Return on Assets was 10.0%. Earnings for the 

period have enabled us to maintain profitability levels of the group, absorbing the capitalization of 80% of the earnings for the year 2007. The 

absence of earnings on investments that have not yet entered into production had a slight effect on the Return on Total Assets.

Backlog and Perspectives

• The group’s backlog rose 20.8% at the 2008 closing, amounting to S/. 2,607.2 (US$ 829.8 MM), which represents 1.38x 

the activity for the last 12 months. Of this total, S/. 1,555.6 MM (US$ 495.1 MM) shall be executed in 2009, S/. 702.9 MM (US$ 223.8 MM) 

in 2010 and the balance from 2011 onward. 

It should be noted that the backlog to be executed in 2009 is 28.8% higher than the backlog reported at the 2007 year-end closing. Due to this 

Backlog, as well as the expected return on Capital Investments, despite the international financial crisis, the group projects growth, although 

at a more moderate level than that reported for prior years. 

133

 
• The group’s Capital Investments during the year 2008 totaled S/ 315.1 MM (US$ 100.3 MM), increasing substantially. Of the total investments, 

S/.126.6 MM (US$ 40.3 MM) correspond to investments in the hydrocarbons sector, S/. 59.1 MM (US$ 18.8 MM) to land acquisitions for the 

development of the real estate business and S/. 39.0 MM (US$ 12.4 MM) correspond to Infrastructure Concessions. The balance invested 

mainly corresponds to investments in machinery and equipment in the construction business and in the expansion and modernization of the 

group’s corporate offices. These investments are consistent with the three sectors on which the group focuses its strategic development.

Backlog Consolidado US$ MM

830

720

539

592

2005

2006

2007

2008

900

800

700

600

500

400

300

200

100

0

134

Subsidiaries of Graña y Montero S.A.A.

The Graña y Montero Group operates in diverse economic sectors, primarily through the following subsidiaries:

GyM, the original construction company, 

which has four divisions: Civil Works, 

Electromechanics, Buildings and Real Estate

GMD, the leading company providing 

information technology solutions for the 

corporate market 

GMP, the petroleum services company 

dedicated to the extraction of petroleum and 

the drilling of wells in the northern part of the 

country. It is the operating partner of Consorcio 

Terminales, a consortium with Oiltanking of 

Germany for the operation of 9 fuel storage 

terminals in Peru and and 10 terminals plus 

1,600 Km of pipelines in Bolivia (CLHB). 

GMI, the company dedicated to design 

engineering, construction project supervision 

and project management that is also the 

majority shareholder of ECOTEC, a company 

specializing in environmental engineering

Concession Operations, for several years, 

Graña y Montero has participated in the 

concession business. Currently, it holds the 

concessions for the operation of Road Network 

No. 5 (Norvial S.A.), the Northern IIRSA Highway, 

Survial and the Tacna Road Concession.

Larcomar, which is located on the cliffs at 

the bottom of the Salazar park in the district 

of Miraflores, has a total area of 44,675 m². Its 

main business is real estate, through leases 

on commercial properties in the entertainment 

area and the recently opened area called 

Fashion Center. In addition, it generates income 

from business ventures such as the parking lot 

and advertising in the center. 

135