Quarterlytics / Basic Materials / Gold / Vista Gold Corp.

Vista Gold Corp.

vgz · AMEX Basic Materials
Claim this profile
Ticker vgz
Exchange AMEX
Sector Basic Materials
Industry Gold
Employees 13
← All annual reports
FY2021 Annual Report · Vista Gold Corp.
Sign in to download
Loading PDF…
Table of Contents

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-K

☒

☐

  ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2021
OR

  TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from              to

Commission file number: 001-9025

VISTA GOLD CORP.
 (Exact Name of Registrant as Specified in its Charter)

British Columbia
(State or other jurisdiction of incorporation or organization)

98-0542444
(I.R.S. Employer Identification No.)

7961 Shaffer Parkway, Suite 5
Littleton, Colorado
(Address of Principal Executive Offices)

80127
(Zip Code)

(720) 981-1185
(Registrant’s Telephone Number, including Area Code)

SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:

Title of Each Class
Common Shares, no par value

Trading Symbol
VGZ

Name of Each Exchange on Which Registered
NYSE American

SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT:  None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ◻ No⌧

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ◻ No⌧

Indicate  by  checkmark  whether  the  registrant  (1)  filed  all  reports  required  to  be  filed  by  Section  13  or  15(d)  of  the  Securities  Exchange  Act  of  1934  during  the
preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past
90 days.
Yes ⌧ No ◻

Indicate by check mark whether the Registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation
S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ⌧ No ◻

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging
growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the
Exchange Act.

 Large Accelerated Filer ◻      Accelerated Filer ◻      Non-Accelerated Filer ⌧ Smaller Reporting Company ☒ Emerging growth company ☐  

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised
financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ◻

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over
financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit
report. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes ☐ No⌧

State the aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the price at which the common equity
was  last  sold,  or  the  average  bid  and  asked  price  of  such  common  equity,  as  of  the  last  business  day  of  the  registrant’s  most  recently  completed  second  fiscal
quarter: $85,760,855

The number of shares of the Registrant’s Common Stock outstanding as of February 14, 2022 was 117,189,232.

Documents incorporated by reference:  To the extent herein specifically referenced in Part III, portions of the Registrant’s Definitive Proxy Statement on Schedule
14A for the 2022 Annual General Meeting of Shareholders are incorporated herein. See Part III.

          
     
 
Table of Contents

TABLE OF CONTENTS

PART I

ITEM 1. BUSINESS
METRIC CONVERSION TABLE
GLOSSARY
CAUTIONARY  NOTE  TO  INVESTORS  REGARDING  ESTIMATES  OF  MEASURED,  INDICATED  AND

INFERRED RESOURCES AND PROVEN AND PROBABLE MINERAL RESERVES

NOTE REGARDING FORWARD-LOOKING STATEMENTS
ITEM 1A. RISK FACTORS
ITEM 1B. UNRESOLVED STAFF COMMENTS
ITEM 2. PROPERTIES
ITEM 3. LEGAL PROCEEDINGS
ITEM 4. MINE SAFETY DISCLOSURES

PART II

ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND

ISSUER PURCHASES OF EQUITY SECURITIES

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF

OPERATIONS

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL

DISCLOSURE

ITEM 9A. CONTROLS AND PROCEDURES
ITEM 9B. OTHER INFORMATION

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
ITEM 11. EXECUTIVE COMPENSATION
ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND

PART III

RELATED STOCKHOLDER MATTERS

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS
ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
PART IV

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
ITEM 16. FORM 10-K SUMMARY

Page

2
6
6
9

9
13
21
22
46
46

47

50

59
79

79
79

79
80
80

80
80

80
82

1

Table of Contents

ITEM 1. BUSINESS.

PART I

In  this  annual  report  on  Form  10-K,  unless  the  context  otherwise  requires,  the  terms  “we”,  “us”,  “our”,  “Vista”,  “Vista
Gold”,  or  the  “Company”  refer  to  Vista  Gold  Corp.  and  its  subsidiaries.  References  to  AUD  or  A$  refer  to  Australian
currency and USD or $ refer to United States currency, all in thousands, unless specified otherwise, except per share-
related, per tonne, and per ounce amounts.

Overview

Vista  Gold  Corp.  and  its  subsidiaries  operate  in  the  gold  mining  industry.  We  are  focused  on  evaluation,  acquisition,
exploration and advancement of gold exploration and potential development projects, which may lead to gold production
or value adding strategic transactions such as earn-in right agreements, option agreements, leases to third parties, joint
venture arrangements with other mining companies, or outright sales of assets for cash and/or other consideration. We
look  for  opportunities  to  improve  the  value  of  our  gold  projects  through  exploration  drilling  and/or  technical  studies
focused on optimizing previous engineering work. We do not currently generate cash flows from mining operations.

The Company’s flagship asset is its 100% owned Mt Todd gold project (“Mt Todd” or the “Project”) in Northern Territory,
Australia  (“NT”).  With  the  approval  of  the  Mining  Management  Plan  (“MMP”)  in  June  2021,  all  major  operating  and
environmental permits for Mt Todd have been received. Mt Todd is the largest undeveloped gold project in Australia.

Vista recently completed the Mt Todd Feasibility Study (“2022 FS”), which is highlighted by:

● Estimated  proven  and  probable  mineral  reserves  of  6.98  Moz  of  gold  (280  Mt  at  0.77  g  Au/t)  using  a  gold

price of $1,125 for the reserve estimate and a cut-off grade of 0.35 g Au/t(1)(2);

● Average annual production of 395,000 ounces of gold over a 16-year mine life;

●

●

Life of Mine average cash costs of $817 per ounce;

Initial capital requirements of $892 million, which assume an owner-operated mining fleet, power generated
on-site by a third-party, and a locally based employee workforce;

● After-tax NPV 5% of $999.5 million and internal rate of return (“IRR”) of 20.6% at a gold price of $1,600 per

ounce; and

● After-tax NPV5% of $1,458 million and IRR of 26.7% at a price of $1,800 per ounce of gold.

(1) Note  to  investors:  Proven  and  probable  mineral  reserves  are  estimated  in  accordance  with  S-K  1300  and  CIM  Definition

Standards.

(2) See  “Item  2.  Properties  –  Mt  Todd  Gold  Project,  Northern  Territory,  Australia  –  Mineral  Resources  and  Mineral  Reserve

Estimates” in this annual report on Form 10-K for additional information.

We have invested over $105 million to systematically explore, evaluate, engineer, permit and de-risk Mt Todd since we
acquired it in 2006. In recent years, we have completed a number of optimization studies, which have been incorporated
into the 2022 FS. This work has added substantial value to the Project and positions Mt Todd for near-term development.
We  believe  the  results  will  appeal  to  potential  partners,  investors  and  lenders  and  allow  us  to  evaluate  a  range  of
development alternatives as we continue to focus on maximizing shareholder value in a cost-effective manner.

The 2022 FS includes reserve estimates pursuant to subpart 1300 of Regulations S-K (“S-K 1300”) under the Securities
Exchange Act of 1934, as amended (the “Exchange Act”) and CIM Definition Standards based on mine plans developed
using a gold price in line with current market conditions. The 2022 FS addresses recommendations from the 2019 pre-
feasibility study and includes minor updates of the Project design to be consistent with the MMP, engineering and detailed
costing in all areas of the Project.

The 2022 FS highlights a 19% increase in gold reserves from 5.85 million ounces to 6.98 million ounces, supporting an
operation  with  average  annual  production  of  479,000  ounces  of  gold  during  the  first  seven  years  of  commercial
operations

2

Table of Contents

and  a  low  operating  cost  profile  that  delivers  significant  cashflows  over  a  16-year  mine  life.  The  2022  FS  reflects  the
inflationary  pressures  being  faced  currently  by  all  operators  in  the  mining  industry.  While  management  believes  this
inflationary trend is transitory, the resilience of Mt Todd is demonstrated by the  project economics reflected in the 2022
FS. Mt Todd’s attributes, together with Vista’s deep understanding of the various project components create optionality in
the approach to its development. For example, the Company decision to have a third-party build, own, and operate the
power  plant  has  resulted  in  capital  cost  savings  and  eliminated  certain  construction  and  operating  risks  while  retaining
attractive operating costs.

We believe this work has added substantially to the value of the Project, which reflects a $1.5 billion net present value
(NPV5%) at the recent gold price of $1,800 per ounce and a 0.71 AUD:USD exchange rate and demonstrates near-term
development potential. See the “Item 2. Properties – Gold Price and Foreign Exchange Sensitivity Table” below.

Resources  and  reserves  growth  potential  at  Mt  Todd  includes  a  number  of  opportunities.  There  is  potential  to  convert
additional  known  mineral  resources  to  mineral  reserves,  and  both  the  Batman  and  Quigleys  deposits  remain  open.
Recent drilling demonstrates the continuity of mineralization between these two deposits, and Vista controls 1,650 sq. km
of exploration licenses at the southeast end of the Pine Creek Mining District.

In addition to the technical advancements of the Project, with the recent approval of the MMP, Vista now has all major
operating  and  environmental  permits  for  the  development  of  Mt  Todd.  We  have  invested  significant  resources  in  water
treatment and management, environmental, and social programs. We believe this has benefited our relationships with the
traditional landowners, local communities, and NT Government, creating a strong social license.

Vista has successfully monetized a number of non-core assets to support continuing operations in a non-dilutive manner.
This  includes  cash  proceeds  to  the  Company  totaling  $14,090  during  2020,  2021  and  January  2022.  The  Company
continues to focus on monetizing a royalty interest in a U.S. exploration-stage project and used mill equipment.

Vista was originally incorporated on November 28, 1983 under the name “Granges Exploration Ltd.” It amalgamated with
Pecos Resources Ltd. during June 1985 and continued as Granges Exploration Ltd. In June 1989, Granges Exploration
Ltd. changed its name to Granges Inc. Granges Inc. amalgamated with Hycroft Resources & Development Corporation
during May 1995 and continued as Granges Inc. Effective November 1996, Da Capo Resources Ltd. and Granges, Inc.
amalgamated  under  the  name  “Vista  Gold  Corp.”  and,  effective  December  1997,  Vista  continued  from  the  Province  of
British  Columbia  to  the  Yukon  Territory,  Canada  under  the  Business  Corporations  Act  (Yukon  Territory).  On  June  11,
2013, Vista continued from the Yukon Territory, Canada to the Province of British Columbia, Canada under the  Business
Corporations Act (British Columbia). The current addresses, telephone and facsimile numbers of our offices are:

Executive Office
7961 Shaffer Parkway, Suite 5
Littleton, Colorado, USA 80127
Telephone: (720) 981-1185
Facsimile: (720) 981-1186

Registered and Records Office
1200 Waterfront Centre – 200 Burrard Street
Vancouver, British Columbia, Canada V7X 1T2
Telephone: (604) 687-5744
Facsimile: (604) 687-1415

Human Capital Management

As of December 31, 2021, we had 17 full-time and no part-time employees globally. In addition, we use consultants with
specific  skills  to  assist  with  various  aspects  of  our  corporate  affairs,  project  evaluation,  due  diligence,  corporate
governance and property management.

Our compensation programs are designed to align compensation of our employees with Vista’s corporate objectives and
performance, and are designed to provide proper incentives to attract, retain and motivate employees to achieve superior
results.  The  structure  of  our  compensation  programs  balances  competitive  wages,  benefits  and  incentive  earnings  for
both short-term and long-term performance.

The health and safety of our employees and others is a high priority in the way we manage our business. Oversight is
provided by the Company’s Board of Directors through the Health, Safety, Environment and Social Responsibility

3

    
 
 
 
 
Table of Contents

Committee.  Management  utilizes  the  principles  set  out  in  our  Health  &  Safety  Policy  to  administer  health  and  safety
programs. Employees and others entering our workplaces are provided with relevant orientation and required to adhere to
established  site  protocols.  In  addition  to  recurring  health  and  safety  considerations,  we  follow  COVID-19  mitigation
measures recommended by government and health agencies in the jurisdictions where we operate.

Vista’s  priority  to  maintain  a  culture  of  ethical  performance  as  a  core  value  is  reflected  in  the  Company’s  Code  of
Business Conduct and Ethics and other related policies. Oversight is provided by the Company’s Board of Directors and,
for specific areas of performance, by committees of the Board of Directors. Employees are required to review the Code of
Business  Conduct  and  Ethics  and  acknowledge  their  understanding  of  the  content  and  intent  to  comply  on  a  periodic
basis. Our compensation programs also include consideration of ethical performance in determining incentive awards.

Vista  values  the  diversity  and  talents  of  its  team,  collectively  working  together  in  an  inclusive  environment  to  achieve
corporate  goals  and  personal  and  professional  development  objectives.  We  cultivate  a  culture  that  is  sensitive  to  the
importance of diversity and inclusion in the workplace and are committed to continuous improvement in these areas.

Environmental, Social, and Governance Responsibility

Vista  is  committed  to  implementing  and  continuing  to  develop  business  practices  that  are  designed  to  mitigate
environmental impacts of our operating activities, support the people and communities within our areas of influence, and
appropriately manage the business affairs of our organization. We believe part of being a good corporate citizen requires
a dedicated focus on how we affect the environment and fulfill our responsibilities to stakeholders. In particular, through
our planning for development of Mt Todd, we have worked closely with governmental entities in the NT and local groups,
including the Jawoyn Association Aboriginal Corporation (the “Jawoyn”), to strive towards an environmentally sound and
socially responsible development plan.

Segment Information

We  have  one  reportable  segment,  consisting  of  evaluation,  acquisition  and  exploration  activities  which  are  focused
principally in Australia. We evaluate, acquire, explore and advance gold exploration and potential development projects,
which  may  lead  to  gold  production  or  value  adding  strategic  transactions  such  as  earn-in  right  agreements,  option
agreements,  leases  to  third  parties,  joint  venture  arrangements,  or  outright  sales  of  assets.  We  reported  no  mining
operating revenues during the years ended December 31, 2021 and 2020. Geographic location of mineral properties and
plant  and  equipment  is  provided  in  Notes  4  –  Mineral  Properties  and  5  –  Plant  and  Equipment  to  our  Consolidated
Financial Statements under the section heading “Item 8. Financial Statements and Supplementary Data” below.

Reclamation

The  Mt  Todd  site  was  not  reclaimed  by  the  predecessor  owners  when  the  mine  closed  in  2000.  Liability  for  the
reclamation  of  the  environmental  conditions  existing  prior  to  the  2006  commencement  of  Vista’s  involvement  with  the
Project is presently the responsibility of the NT Government. After it provides notice to the NT Government that it intends
to proceed with development, the Company will then assume these historical rehabilitation liabilities currently estimated
by  the  NT  Government  at  approximately  A$73  million.  Vista  does  not  expect  to  give  such  notice  until  a  project
development decision has been made, major project permits are confirmed to be in alignment with the final development
plan, and project financing is arranged.

We generally will be required to mitigate long-term environmental impacts, including any of those existing prior to 2006
that  are  not  otherwise  mitigated  during  the  mine  life,  by  stabilizing,  contouring,  re-sloping  and  re-vegetating  various
portions  of  the  Project  after  mining  and  mineral  processing  operations  are  completed.  Reclamation  programs  will  be
conducted  in  accordance  with  detailed  plans,  which  must  be  reviewed  and  approved  by  the  appropriate  regulatory
agencies.

Additionally,  Vista  maintains  a  $240  provision  for  potential  reclamation  costs  attributable  to  certain  mining  claims
previously held by the Company should no other viable potentially responsible parties be identified.

4

Table of Contents

Government Regulation

Our exploration and development activities and other property interests are subject to various national, state, provincial
and local laws and regulations in Australia and other jurisdictions, which govern prospecting, development, mining, mine
safety,  production,  exports,  taxes,  labor  standards,  occupational  health,  waste  disposal,  protection  of  the  environment,
the use and disposal  of hazardous substances, and other matters. We have obtained all major authorizations and have
pending applications for other minor licenses, permits or other authorizations currently required to conduct our exploration,
development,  and  other  programs.  We  believe  we  are  in  compliance  in  all  material  respects  with  applicable  mining,
health, safety and environmental statutes and regulations in all of the jurisdictions in which we operate.

Australian Laws

Mineral projects in the NT are subject to Australian federal and NT laws and regulations regarding environmental matters
and the use and disposal of hazardous wastes and materials. As with all mining projects, Mt Todd is expected to have a
variety of environmental impacts should development proceed. In Australia, environmental legislation plays a significant
role  in  the  mining  industry.  We  are  required  under  Australian  laws  and  regulations  (federal  and  territorial)  to  acquire
permits  and  other  authorizations  before  Mt  Todd  can  be  developed  and  mined.  In  September  2014,  the  environmental
impact  statement  (“EIS”)  for  Mt  Todd  was  approved.  The  Environmental  Protection  Agency  of  the  Northern  Territory
Government (“NTEPA”) advised that it had assessed the environmental impacts of the proposed gold mine at Mt Todd
and authorized the Company to proceed with development, subject to a number of recommendations as outlined in the
assessment  report  (the  “Assessment  Report”).  The  Assessment  Report  included  a  request  for  Vista  to  secure  an
authorization under the federal Environmental Protection and Biodiversity Conservation Act 1999 (“EPBC”) as it relates to
the Gouldian Finch. In January 2018, the authorization required by the EPBC was approved by the Australia Department
of the Environment and Energy. We must comply with the terms of our Authority Certificate under the Northern Territory
Aboriginal Sacred Sites Act 1989 which deals with the handling of archeological material and sacred sites. We are also
to statutory  requirements  under  the  Mining  Management  Act,  which  includes  the  requirement  to  receive
subject 
authorization of an MMP before the start of mining operations. The Mt Todd MMP was approved by the Northern Territory
Department  of  Industry,  Tourism  and  Trade  (“DITT”)  in  June  2021  and  will  be  amended  to  align  with  the  larger-scale
design in the 2022 FS.

Environmental Regulation

Mt Todd is subject to various federal, territorial and local laws and regulations governing protection of the environment.
These laws are continually changing and, in general, are becoming more restrictive. Our policy is to conduct business in
a  way  that  safeguards  public  health  and  the  environment.  We  believe  that  our  operations  are  conducted  in  material
compliance with applicable laws and regulations.

Changes  to  current  local,  territorial,  or  federal  laws  and  regulations  in  the  jurisdictions  where  we  have  exploration  and
development activities could require additional capital expenditures and increase operating and/or reclamation costs. We
are  unable  to  predict  what  additional  legislation,  if  any,  might  be  proposed  or  enacted,  or  what  additional  regulatory
requirements could impact the economics of Mt Todd.

During  2021,  Mt  Todd  did  not  have  any  material  non-compliance  occurrences  with  any  applicable  environmental  laws
and regulations. See “Item 1. Business – Reclamation” above.

Competition

We compete with other mining companies to acquire, explore, finance and develop gold properties and to retain expert
consultants  required  to  complete  our  geological  and  project  development  studies.  We  also  compete  with  other  mining
companies to hire mining engineers, geologists and other skilled personnel in the mining industry, and for exploration and
development  services.  Some  of  these  competing  mining  companies  have  substantially  greater  financial  and  technical
resources than Vista. As a result, we may have difficulty acquiring attractive gold projects at reasonable prices, engaging
skilled consultants, and attracting and retaining qualified personnel.

5

Table of Contents

Gold Price History

The price of gold is volatile and is affected by numerous factors, all of which are beyond our control, such as the sale or
purchase of gold by various central banks and financial institutions, inflation, recession, fluctuation in the relative values of
the U.S. dollar and foreign currencies, changes in global gold supply and demand, and political and economic conditions.

The following table presents the high, low and average London Bullion Market Association PM Fix prices in U.S. dollars
per troy ounce of gold over the past five years:

Year
2017
2018
2019
2020
2021
2022 (to February 14, 2022)

High
 1,346
 1,355
 1,546
 2,067
 1,943
 1,866

$
$
$
$
$
$

Low
 1,151
 1,178
 1,270
 1,474
 1,684
 1,788

$
$
$
$
$
$

     Average

$
$
$
$
$
$

 1,257
 1,269
 1,393
 1,770
 1,799
 1,818

Data Source: www.lbma.org.uk/prices-and-data/precious-metal-prices#/

Available Information

We make available, without charge, on or through our website at  www.vistagold.com, our annual report on Form 10-K,
quarterly  reports  on  Form  10-Q,  current  reports  on  Form  8-K,  and  any  amendments  to  those  reports  filed  or  furnished
pursuant  to  Section  13(a)  or  15(d)  of  the  U.S.  Securities  Exchange  Act  of  1934.  Our  website  and  the  information
contained  therein  or  connected  thereto  are  not  intended  to  be,  and  are  not,  incorporated  into  this  annual  report  on
Form 10-K.

Metric Conversion Table

To Convert Metric Measurement Units
Hectares
Meters
Kilometers
Tonnes
Liters
Grams
Grams per tonne

Glossary

    To Imperial Measurement Units     Multiply by
2.4710
3.2808
0.6214
1.1023
0.2642
0.0322
0.0292

Acres
Feet
Miles
Tons (short)
Gallons
Ounces (troy)
Ounces (troy) per ton (short)

“acid rock drainage ” results from the interaction of meteoric water with oxidizing sulfide minerals.

“bedding”  means  the  characteristic  structure  of  sedimentary  rock  in  which  layers  of  different  composition,  grain  size  or
arrangement are layered one on top of another in a sequence with oldest on the bottom and youngest at the top.

“comminution” means the process in which ore is broken into small fragments by crushing, grinding, and other processes.

“conglomerate” refers to clastic sedimentary rock that contains rounded particles that are greater than two millimeters in
diameter. The space between the pebbles is generally filled with smaller particles and/or a chemical cement that binds
the rock together.

“cut-off  grade”  means  the  grade  (i.e.,  the  concentration  of  metal  or  mineral  in  rock)  that  determines  whether  mined
mineralized material will be processed or considered waste.

“deposit” is an informal term for an accumulation of mineralized material.

6

    
    
Table of Contents

“development stage issuer” is an issuer that is engaged in the preparation of mineral reserves for extraction on at least
one material property.

“development stage property”  is  a  property  that  has  mineral  reserves  disclosed,  pursuant  to  S-K  1300,  but  no  material
extraction.

“feasibility study”  is  a  comprehensive  technical  and  economic  study  of  the  selected  development  option  for  a  mineral
project  that  includes  appropriately  detailed  assessments  of  realistically  assumed  mining,  processing,  metallurgical,
economic,  marketing,  legal,  environmental,  social  and  governmental  considerations  together  with  any  other  relevant
operational  factors  and  detailed  financial  analysis,  that  are  necessary  to  demonstrate  at  the  time  of  reporting  that
extraction  is  reasonably  justified  or  economically  viable.  The  results  of  a  feasibility  study  may  reasonably  serve  as  the
basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of a project.
The confidence level of a feasibility study is higher than that of a preliminary feasibility study.

“foliation” means planar arrangement of structural or textural features in any rock type.

“g Au/t” means grams of gold per tonne.

“geosyncline” means a major trough or downwarp of the Earth’s crust, in which great thicknesses of sedimentary and/or
volcanic rocks have accumulated.

“indicated mineral resource ” and “indicated resource” mean “indicated mineral resource” defined by S-K 1300 as that part
of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence
and  sampling.  The  level  of  geological  certainty  associated  with  an  indicated  mineral  resource  is  sufficient  to  allow  a
qualified  person  to  apply  modifying  factors  in  sufficient  detail  to  support  mine  planning  and  evaluation  of  the  economic
viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence
of a measured mineral resource, an indicated mineral resource may be converted only to a probable mineral reserve.

“inferred mineral resource ” and “inferred resource” mean “inferred mineral resource” defined by S-K 1300 as that part of a
mineral  resource  for  which  quantity  and  grade  or  quality  are  estimated  on  the  basis  of  limited  geological  evidence  and
sampling.  The  level  of  geological  uncertainty  associated  with  an  inferred  mineral  resource  is  too  high  to  apply  relevant
technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation
of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral
resources, which prevents the application of modifying factors in a manner useful for evaluation of economic viability, an
inferred mineral resource may not be considered when assessing the economic viability of a mining project, and may not
be converted to a mineral reserve.

“intrusives” refers to igneous rocks that crystallize below the earth’s surface.

“measured mineral resource ” and “measured resource” mean “measured mineral resource” defined by S-K 1300 as that
part  of  a  mineral  resource  for  which  quantity  and  grade  or  quality  are  estimated  on  the  basis  of  conclusive  geological
evidence  and  sampling.  The  level  of  geological  certainty  associated  with  a  measured  mineral  resource  is  sufficient  to
allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine
planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher
level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a
measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.

“mineral reserve” is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the
opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically
mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses
that may occur when the material is mined or extracted.

7

Table of Contents

“mineral resource ”  is  a  concentration  or  occurrence  of  material  of  economic  interest  in  or  on  the  Earth's  crust  in  such
form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a
reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions,
location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in
part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.

“ore”  means  material  containing  minerals  in  such  quantity,  grade  and  chemical  composition  that  they  can  be
economically extracted.

“ore sorting”  means  technology  that  separates  “ore”  and  “waste”  based  on  physical  and/or  chemical  properties  of  the
material being sorted.

“oxide” means mineralized rock in which some of the original minerals have been oxidized ( i.e., combined with oxygen).
Oxidation  tends  to  make  the  rock  more  porous  and  permits  a  more  complete  permeation  of  cyanide  solutions  so  that
minute particles of gold in the interior of the minerals will be more readily dissolved.

“probable  mineral  reserves ”  under  S-K  1300  is  the  economically  mineable  part  of  an  indicated  and,  in  some  cases,  a
measured mineral resource.

“proven mineral reserves ”  under  S-K  1300  is  the  economically  mineable  part  of  a  measured  mineral  resource  and  can
only result from conversion of a measured mineral resource.

“qualified person” as defined under S-K 1300 is an individual who is: (1) A mineral industry professional with at least five
years of relevant experience in the type of mineralization and type of deposit under consideration and in the specific type
of activity that person is undertaking on behalf of the registrant; and (2) An eligible member or licensee in good standing of
a recognized professional organization at the time the technical report is prepared. For an organization to be a recognized
professional organization, it must: (i) Be either: (A) An organization recognized within the mining industry as a reputable
professional association; or (B) A board authorized by U.S. federal, state or foreign statute to regulate professionals in the
mining, geoscience or related field; (ii) Admit eligible members primarily on the basis of their academic qualifications and
experience; (iii) Establish and require compliance with professional standards of competence and ethics; (iv) Require or
encourage continuing professional development; (v) Have and apply disciplinary powers, including the power to suspend
or  expel  a  member  regardless  of  where  the  member  practices  or  resides;  and  (vi)  Provide  a  public  list  of  members  in
good standing.

“recovery”  means  that  portion  of  the  metal  contained  in  the  ore  that  is  successfully  extracted  by  processing  and  is
expressed as a percentage.

“sampling” means selecting a fractional, but representative, part of a mineral deposit for analysis.

“scats”  means  material  in  a  ball  mill  or  semi  autogenous  grinding  mill  (“SAG  Mill”)  that  has  become  rounded  and  no
longer susceptible to additional size reduction. This material is commonly rejected from the grinding circuit for additional
crushing because it contributes to higher energy consumption within the mill.

“strike”  when  used  as  a  noun,  means  the  direction,  course  or  bearing  of  a  vein  or  rock  formation  measured  on  a  level
surface and, when used as a verb, means to take such direction, course or bearing.

“sulfide” means a compound of sulfur and some other element. From a metallurgical perspective, sulfide rock is primary
rock that has not been oxidized. Both ore and waste may contain sulfide minerals.

“tailings” means material rejected from a mill after most of the valuable minerals have been extracted.

“tpd” means tonnes per day.

“tuffs” are a type of rock consisting of consolidated volcanic ash ejected from vents during a volcanic eruption.

8

Table of Contents

“vein” means a fissure, fault or crack in a rock filled by minerals that have traveled upwards from some deep source.

“waste” means rock lacking sufficient grade and/or other characteristics of ore.

Cautionary Note to Investors Regarding Estimates Of Measured, Indicated And Inferred Resources And Proven
And Probable Mineral Reserves

We  are  subject  to  the  reporting  requirements  of  the  Exchange  Act  and  applicable  Canadian  securities  laws,  and  as  a
result  we  report  our  mineral  reserves  and  mineral  resources  according  to  two  different  standards.  U.S.  reporting
requirements  are  governed  by  S-K  1300.  Canadian  reporting  requirements  for  disclosure  of  mineral  properties  are
governed by NI 43-101. Both sets of reporting standards have similar goals in terms of conveying an appropriate level of
confidence in the disclosures being reported, but the standards embody slightly different approaches and definitions.

In  our  public  filings  in  the  U.S.  and  Canada  and  in  certain  other  announcements  not  filed  with  the  SEC,  we  disclose
proven and probable reserves and measured, indicated and inferred resources, each as defined in S-K 1300 and NI 43-
101.  As  currently  reported,  there  are  no  material  differences  in  our  disclosed  proven  and  probable  reserves  and
measured,  indicated  and  inferred  resource  under  each  of  S-K  1300  and  NI  43-101.  The  estimation  of  measured
resources  and  indicated  resources  involve  greater  uncertainty  as  to  their  existence  and  economic  feasibility  than  the
estimation of proven and probable reserves, and therefore investors are cautioned not to assume that all or any part of
measured or indicated resources will ever be converted into S-K 1300-compliant or NI 43-101-compliant reserves.  The
estimation  of  inferred  resources  involves  far  greater  uncertainty  as  to  their  existence  and  economic  viability  than  the
estimation of other categories of resources, and therefore it cannot be assumed that all or any part of inferred resources
will  ever  be  upgraded  to  a  higher  category.  Therefore,  investors  are  cautioned  not  to  assume  that  all  or  any  part  of
inferred resources exist, or that they can be mined legally or economically.

Note Regarding Forward-Looking Statement s

This annual report, including all exhibits hereto and any documents that are incorporated by reference as set forth on the
face page under “Documents incorporated by reference”, contains “forward-looking statements” within the meaning of the
Private Securities Litigation Reform Act of 1995  and forward-looking information under Canadian securities laws that are
intended to be covered by the safe harbor created by such legislation. All statements, other than statements of historical
facts, included in this annual report on Form 10-K, our other filings with the SEC and Canadian securities commissions
and  in  press  releases  and  public  statements  by  our  officers  or  representatives  that  address  activities,  events  or
developments  that  we  expect  or  anticipate  will  or  may  occur  in  the  future  are  forward-looking  statements  and  forward-
looking information, including, but not limited to, those listed below:

Operations

●

●

●

●

●

●

our belief that the 2022 FS has added substantial value to the Mt Todd gold project (“Mt Todd” or the “Project”)
and positions the Project for near-term development;

our  continued  focus  on  improving  the  economic  potential  of  the  Project  and  increasing  shareholder  value  in  a
cost-effective manner;

our belief that our investments to systematically explore, evaluate, engineer, permit and de-risk the Project have
added to the underlying value of the Project and demonstrate strong development potential;

our  plans  and  available  funding  to  continue  to  identify  and  study  potential  Mt  Todd  optimizations,  project
improvements and efficiencies;

the  results  of  the  2022  FS  and  its  related  estimates  and  projections,  including  projected  free  cash  flow,  future
exchange rates and commodity prices; 

our belief that the results of the 2022 FS will appeal to potential partners, investors, and lenders and allow us to
pursue a range of development alternatives as we continue to focus on maximizing shareholder value;

9

Table of Contents

●

●

●

●

●

●

●

●

●

●

the feasibility of Mt Todd and the timing, performance and results of the 2022 FS; 

our belief that fine grinding will improve gold recoveries and favorably impact project economics;

estimates of future operating and financial performance;

future drilling plans;

our expectation of Mt Todd’s impact, including environmental and economic impacts;

plans  and  estimates  concerning  potential  Mt  Todd  development,  including  access  to  an  adequate  supply  of
water, the availability of natural gas on acceptable terms, as well as the ability to obtain all required permits; 

our  expectation  that  dewatering  of  the  pit  will  not  present  any  major  issues  when  resuming  operations  in  the
Batman pit;

estimates of mineral reserves and mineral resources;

our intention to improve the value of our gold projects;

the potential that development projects may lead to gold production or value-adding strategic transactions;

● management belief that the inflationary trend is transitory, and that the resilience of Mt Todd is demonstrated by

the project economics reflected in the 2022 FS;

●

●

●

●

●

●

●

●

●

●

●

●

●

our  belief  that  we  are  in  compliance  in  all  material  respects  with  applicable  mining,  health,  safety  and
environmental statutes and regulations in all of the jurisdictions in which we operate and that our operations are
conducted in material compliance with applicable laws and regulations;

our estimates with respect to historical mine production at Mt Todd;

our expectation that plus 5/8” HPGR (as defined below) crusher product at Mt Todd is harder than the minus 5/8”
crushed product and that the hardness of ore in the Batman deposit is relatively consistent;

our  expectation  that  the  use  of  HPGR  crushers  at  Mt  Todd  will  produce  a  product  that  can  be  ground  more
efficiently and reduce energy requirements as compared to a SAG Mill design;

the expectation that reclamation of the heap leach pad at Mt Todd will include disposal of pad liner and regrading
of the area occupied by the heap leach pad only as the material on the existing heap leach pad will be processed
through the mill at the end of mine life; and

our  expectation  that  existing  infrastructure  at  Mt  Todd  will  reduce  initial  capital  expenditure  and  significantly
reduce capital risk related to infrastructure construction.

Business and Industry

our  expectation  that  existing  working  capital  as  of  December  31,  2021,  together  with  other  potential  future
sources of non-dilutive financing, will be sufficient to fully fund our currently planned corporate expenses, Project
holding costs and discretionary programs for at least 12 months;

our belief that the ATM Program (as defined below) will provide additional financing flexibility at a low cost;

the potential monetization of our non-core assets, including a royalty on a U.S. exploration-stage project and our
used mill equipment which is for sale;

potential expenditures,  funding  requirements  and  sources  of  capital,  including  near-term  sources  of  additional
cash;

our  expectation  that  the  Company  will  continue  to  incur  losses  and  will  not  pay  dividends  for  the  foreseeable
future;

our potential entry into agreements to find, lease, purchase, option or sell mineral interests;

our belief that we maintain reasonable amounts of insurance;

10

Table of Contents

●

●

●

●

●

●

our expectations related to potential changes in regulations or taxation initiatives;

our expectation that we will continue to be a passive foreign investment company;

the potential that we may grant options and/or other stock-based awards to our directors, officers, employees and
consultants;

preliminary estimates of the reclamation and other related costs that would be incurred if we were to notify the NT
Government that we intend to proceed with development and assume rehabilitation liability for Mt Todd;

the efficacy of the measures we have implemented to mitigate the risks of COVID and the detrimental effects it
may have on our operations; and

the  potential  that  future  expenditures  may  be  required  for  compliance  with  various  laws  and  regulations
governing the protection of the environment.

Forward-looking statements and forward-looking information have been based upon our current business and operating
plans,  as  approved  by  the  Company’s  Board  of  Directors  (the  “Board”);  our  cash  and  other  funding  requirements  and
timing and sources thereof; results of preliminary feasibility and feasibility studies, the accuracy of mineral resource and
reserve  estimates  and  assumptions  on  which  they  are  based;  the  results  of  economic  assessments  and  exploration
activities;  current  market  conditions  and  project  development  plans.  The  material  assumptions  used  to  develop  the
forward-looking  statements  and  forward-looking  information  included  in  this  annual  report  on  Form  10-K  include:  our
expectations of metal prices; our forecasts and expected cash flows; our projected capital and operating costs; accuracy
of mineral resource estimates and resource modeling and preliminary feasibility and feasibility study results; expectations
regarding mining and metallurgical recoveries; timing and reliability of sampling and assay data; anticipated political and
social  conditions;  expected  Australian  national,  provincial  and  local  government  policies,  including  legal  reforms,
successful advancement of the Company’s required permitting processes; ability to successfully raise additional capital.
The words “estimate”, “plan”, “anticipate”, “expect”, “intend”, “believe”, “will”, “may” and similar expressions are intended to
identify forward-looking statements and forward-looking information. These statements involve known and unknown risks,
uncertainties,  assumptions  and  other  factors  which  may  cause  our  actual  results,  performance  or  achievements  to  be
materially  different  from  any  results,  performance  or  achievements  expressed  or  implied  by  such  forward-looking
statements and forward-looking information. These factors include risks such as:

Operating Risks

●

feasibility study results and the accuracy of estimates and assumptions on which they are based; 

● mineral  resources  and  reserves  estimates,  the  accuracy  of  such  estimates  and  the  accuracy  of  sampling  and

subsequent assays and geologic interpretations on which they are based; 

technical and operational feasibility and the economic viability of deposits;

our ability to raise sufficient capital on favorable terms or at all to meet the substantial capital investment at Mt
Todd;

our  ability  to  obtain,  renew  or  maintain  the  necessary  authorizations  and  permits  for  Mt  Todd,  including  its
development plans and operating activities; 

delays in commencement of construction at Mt Todd;

increased costs that affect our operations or our financial condition;

our reliance on third parties to fulfill their obligations under agreements with us;

●

●

●

●

●

●

● whether projects not managed by us will comply with our standards or meet our objectives;

● whether our acquisition, exploration and development activities, as well as the realization of the market value of
our  assets,  will  be  commercially  successful  and  whether  any  transactions  we  enter  into  will  maximize  the
realization of the market value of our assets;

●

the success of future joint ventures, partnerships and other arrangements relating to our properties;

11

Table of Contents

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

●

perception of potential environmental impact of Mt Todd;

known and unknown environmental and reclamation liabilities, including reclamation requirements at Mt Todd;

potential challenges to the title to our mineral properties;

opposition to construction or operation of Mt Todd;

future water supply issues at Mt Todd;

litigation or other legal claims; and

environmental lawsuits.

Financial and Business Risks

fluctuations in the price of gold;

lack of adequate insurance to cover potential liabilities;

the lack of cash dividend payments by us;

our history of losses from operations;

our ability to attract, retain and hire key personnel;

volatility in our stock price and gold equities generally;

our ability to raise additional capital or raise funds from the sale of non-core assets on favorable terms, if at all;

general economic conditions adverse to Mt Todd development or operation;

the  potential  acquisition  of  a  control  position  in  the  Company  for  less  than  fair  value  as  a  result  of  industry
consolidation or otherwise;
lack of success in our efforts to find an acceptable partner, external financing or other acceptable alternatives to
move forward with development of Mt. Todd;

evolving corporate governance and public disclosure regulations;

intense competition in the mining industry;

tax initiatives on domestic and international levels;

fluctuation in foreign currency values;

our likely status as a PFIC (as defined below) for U.S. federal tax purposes;

delays, potential losses and inability to maintain sufficient working capital due to business interruptions or global
economic slowdowns caused by the COVID-19 pandemic;

cybersecurity breaches that threaten or disrupt our information technology systems;

anti-bribery and anti-corruption laws;

direct and indirect consequences of the COVID-19 pandemic; and

potential conflicts of interest arising from certain of our directors and officers serving as directors and officers of
other companies in the natural resources sector.

Industry Risks

inherent hazards of mining exploration, development and operating activities;

a shortage of skilled labor, equipment and supplies;

12

Table of Contents

●

●

●

the accuracy of calculations of mineral reserves and mineral resources and fluctuations therein based on metal
prices, estimated costs, and inherent vulnerability of the ore and recoverability of metal in the mining process;

changes in environmental regulations to which our exploration and development operations are subject; and

changes in climate change regulations could result in increased operating costs.

For a more detailed discussion of such risks and other important factors that could cause actual results to differ materially
from those in such forward-looking statements and forward-looking information, please see “Item 1A. Risk Factors” below
in  this  annual  report  on  Form  10-K.  Although  we  have  attempted  to  identify  important  factors  that  could  cause  actual
results to differ materially from those described in forward-looking statements and forward-looking information, there may
be  other  factors  that  cause  results  to  be  materially  different  than  anticipated,  estimated  or  intended.  There  can  be  no
assurance that these forward-looking statements will prove to be accurate as actual results and future events could differ
materially  from  those  anticipated  in  the  statements.  Except  as  required  by  law,  we  assume  no  obligation  to  publicly
update  any  forward-looking  statements  and  forward-looking  information,  whether  as  a  result  of  new  information,  future
events or otherwise.

ITEM 1A. RISK FACTORS.

An investment in our securities involves a high degree of risk. The risks described below are not the only ones facing the
Company or otherwise associated with an investment in our securities. Additional risks not presently known to us or which
we currently consider not material may also adversely affect our business. If any of the following risks actually occur, our
business, financial condition and operating results could be materially adversely affected.

Operating Risks

We  cannot  be  assured  that  the  Mt  Todd  2022  FS  has,  or  future  feasibility  studies  will,  accurately  forecast
economic results.

Mt Todd is our principal asset. Our ability to arrange financing to develop Mt Todd and our future profitability depend on
the economic and technical feasibility of the Project as established through formal feasibility studies, such as the 2022 FS
just  completed.  There  can  be  no  assurance  that  the  mining,  comminution  and  gold  recovery  processes  (including  ore
sorting),  gold  production  rates,  revenue,  and  capital  and  operating  costs  including  taxes  and  royalties  will  not  vary
unfavorably from the estimates and assumptions included in the 2022 FS, or any future feasibility studies.

Mt  Todd  requires  substantial  capital  investment  and  we  may  be  unable  to  raise  sufficient  capital  on  favorable
terms or at all.

The  construction  and  operation  of  Mt  Todd  will  require  significant  capital.  Our  ability  to  raise  sufficient  capital  and/or
secure  a  development  partner  on  satisfactory  terms,  if  at  all,  will  depend  on  several  factors,  including  the  2022  FS,
acquisition  of  the  requisite  permits,  macroeconomic  conditions,  and  future  gold  prices.  Uncontrollable  factors  or  other
factors such as lower gold prices, unanticipated operating or permitting challenges, perception of environmental impact,
or illiquidity in the debt or equity markets, including the cost of capital and other conditions of financing arrangements that
impose  restrictive  covenants  and  security  interests  that  may  affect  the  Company’s  ability  to  operate  as  intended  and
ultimately its ability to continue as a going concern, could impede our ability to finance Mt Todd on acceptable terms, or at
all.

If  we  decide  to  construct  the  mine  at  Mt  Todd,  we  will  assume  certain  substantial  reclamation  obligations
resulting in a material financial obligation.

The  Mt  Todd  site  was  not  reclaimed  when  the  original  mine  closed.  Although  we  are  not  currently  responsible  for  the
reclamation of these historical disturbances, we will accept full responsibility for them if and when we make a decision to
finance and construct the mine and provide notice to the NT Government of our intention to take over and assume the
management, operation and rehabilitation of Mt Todd. At such time, we will be required to provide a bond or other surety
in a form and amount satisfactory to the NT Government (in whose jurisdiction Mt Todd is located) that would cover the
prospective expense to reclaim the property. In addition, the regulatory authorities may increase reclamation and bonding

13

Table of Contents

requirements  from  time  to  time.  The  satisfaction  of  these  bonding  requirements  and  continuing  or  future  reclamation
obligations will require a significant amount of capital.

There may be delays in the construction of Mt Todd.

Delays  in  commencing  construction  could  result  from  factors  such  as  availability  and  performance  of  engineering  and
construction  contractors,  suppliers,  consultants,  and  employees;  availability  of  required  equipment;  and  availability  of
capital.  Any  delay  in  performance  by  any  one  or  more  of  the  contractors,  suppliers,  consultants,  employees  or  other
persons  on  which  we  depend,  or  lack  of  availability  of  required  equipment,  or  delay  or  failure  to  receive  required
governmental approvals, or financing could delay or prevent commencement of construction at Mt Todd. There can be no
assurance of whether or when construction at Mt Todd will start or that the necessary personnel, equipment or supplies
will be available to the Company if and when construction is started.

Increased costs could impede our ability to become profitable.

Capital and operating costs at mining operations are subject to variation due to a number of factors, such as changing ore
grade,  changing  metallurgy,  and  revisions  to  mine  plans  in  response  to  changing  commodity  prices,  additional  drilling
results and updated geologic interpretations. In addition, costs are affected by the cost of capital, tax and royalty regimes,
trade tariffs, the global cost of mining and processing equipment, commodity prices, and foreign exchange rates, as well
as  the  costs  of  fuel,  electricity,  operating  supplies,  and  appropriately  skilled  labor.  These  costs  are  at  times  subject  to
volatile  price  movements,  including  increases  that  could  make  future  development  and  production  at  Mt  Todd  less
profitable  or  uneconomic.  This  could  have  a  material  adverse  effect  on  our  business  prospects,  results  of  operations,
cash flows and financial condition.

We cannot be assured that we will have an adequate water supply for mining operations at Mt Todd.

Water at Mt Todd is expected to be provided from a fresh water reservoir that is fed by seasonal rains. Insufficient rainfall,
or  drought-like  conditions  in  the  area  feeding  the  reservoir  could  limit  or  extinguish  this  water  supply.  Sufficient  water
resources may not be available, resulting in curtailment or stoppage of operations until the water supply is replenished.
This  could  have  a  material  adverse  effect  on  our  business  prospects,  results  of  operations,  cash  flows  and  financial
condition.

We rely on third parties to fulfill their obligations under agreements.

Our  business  strategy  includes  entering  into  agreements  with  third-parties  (“Third-Parties”).  Such  Third-Parties  may:  (i)
have economic or business interests or goals that are inconsistent with or opposed to ours; (ii) have rights in conflict with
what  we  believe  to  be  in  our  best  interests;  (iii)  take  action  contrary  to  our  policies  or  objectives;  or  (iv)  as  a  result  of
financial  or  other  reasons,  be  unable  or  unwilling  to  fulfill  their  obligations  under  the  agreement(s).  Any  one  or  a
combination of these could result in liabilities for us and/or could adversely affect the value of the related project(s) and,
by  association,  damage  our  reputation  and  consequently  our  ability  to  acquire  or  advance  other  projects  and/or  attract
future Third-Parties.

Our exploration and development interests are subject to evolving environmental regulations.

Our property and royalty interests are subject to environmental regulations. Environmental legislation is becoming more
restrictive  in  some  jurisdictions,  with  stricter  standards  and  enforcement,  increased  fines  and  penalties  for  non-
compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility
for companies and their officers, directors and employees. There is no assurance that future changes in environmental
regulation,  if  any,  will  not  adversely  affect  our  interests.  Currently,  our  property  and  royalty  interests  are  subject  to
government environmental regulations in Australia, Indonesia, and the U.S.

14

Table of Contents

We could be subject to environmental lawsuits.

Neighboring  landowners  and  other  third  parties  could  file  claims  based  on  environmental  statutes  and  common  law  for
personal injury and property damage allegedly caused by environmental nuisance, the release of hazardous substances
or other waste material into the environment on or around our properties. There can be no assurance that our defense of
such  claims  would  be  successful.  This  could  have  a  material  adverse  effect  on  our  business  prospects,  financial
condition, results of operation, and corporate reputation.

We may have material undisclosed environmental liabilities of which we are not aware.

Vista  has  been  engaged  in  gold  exploration  since  1983.  Since  inception  the  Company  has  been  involved  in  numerous
exploration projects in many jurisdictions. There may be environmental liabilities associated with disturbances at any of
these projects for which the Company may be identified as a responsible or potentially responsible party, regardless of its
level of involvement in creating the related disturbance. We may not be aware of such claims against the Company until
regulators provide notice thereof. Consequently, we may have material undisclosed environmental responsibilities which
could  negatively  affect  our  business  prospects,  financial  condition  and  cash  flows,  results  of  operations,  and  corporate
reputation.

There may be challenges to our title to mineral properties.

There  may  be  challenges  to  our  title  to  our  mineral  properties.  If  there  are  title  defects  with  respect  to  any  of  our
properties, we may be required to compensate other persons or reduce or lose our interest in the affected property. Also,
in any such case, the investigation and resolution of title issues could divert Company resources from our core strategies.

Opposition to Mt Todd could have a material adverse effect.

There  is  generally  an  increasing  level  of  public  concern  relating  to  extractive  industries.  Opposition  to  extractive
industries, or our development and operating plans at Mt Todd specifically, could have adverse effects on our reputation
and  support  from  other  stakeholders.  As  a  result,  we  may  be  unable  to  secure  adequate  financing  or  complete  other
activities necessary to continue our planned activities. Any resulting delays or an inability to develop and operate Mt Todd
as planned could have a material adverse effect on our business prospects, results of operations, cash flows, financial
condition and corporate reputation.

Our  exploration  and  development  activities,  strategic  transactions,  or  any  acquisition  activities  may  not  be
commercially successful and could fail to lead to gold production or fail to add value.

Substantial expenditures are required to acquire gold properties, establish mineral reserves through drilling and analysis,
develop  metallurgical  processes  to  extract  metal  from  the  ore  and  develop  the  mining  and  processing  facilities  and
infrastructure  at  any  site  chosen  for  mining.  We  cannot  be  assured  that  any  such  activities  will  be  commercially
successful, lead to gold production, or add value.

Financial and Business Risks

We have a history of losses, and we do not expect to generate earnings from operations or pay dividends in the
near term, if at all.

We are a development stage issuer. As such, we devote our efforts to development of our development stage property,
the  Mt  Todd  project.  We  do  not  currently  produce  gold  and  do  not  currently  generate  operating  earnings  from  gold
production. We finance our business activities principally by issuing equity and selling non-core assets.

We  have  incurred  losses  in  all  periods  since  1998,  except  for  the  years  ended  December  31,  2011,  during  which  we
recorded non-cash net gains, December 31, 2015 during which we recorded gains related to research and development
refunds,  and  December  31,  2020  in  which  we  monetized  certain  mineral  property  interests.  We  expect  to  continue  to
incur

15

Table of Contents

losses. We have no history of paying cash dividends and we do not expect to be able to pay cash dividends or to make
any similar distribution in the foreseeable future, if at all.

A substantial or extended decline in gold prices would have a material adverse effect on the value of our assets
and on our ability to raise capital and could result in lower than estimated economic returns.

The value of our assets, our ability to raise capital and our future economic returns are substantially dependent on the
price  of  gold.  The  gold  price  fluctuates  continually  and  is  affected  by  numerous  factors  beyond  our  control.  Factors
tending to influence gold prices include:

●

●
●
●
●

●
●
●
●

gold  sales  or  leasing  by  governments  and  central  banks  or  changes  in  their  monetary  policy,  including  gold
inventory management and reallocation of reserves;
speculative short or long positions on futures markets;
the relative strength of the U.S. dollar;
expectations of the future rate of inflation or interest rates;
changes  to  economic  conditions  in  the  United  States,  China,  India  and  other  industrialized  or  developing
countries;
geopolitical conflicts;
changes in jewelry, investment or industrial demand;
changes in supply from production, disinvestment and scrap; and
forward sales by producers in hedging or similar transactions.

A substantial or extended decline in the gold price could:

●
●
●
●

●
●
●

negatively impact our ability to raise capital on favorable terms, or at all;
negatively affect our ability to find a partner, investor or lender for the development of Mt Todd;
jeopardize the development of Mt Todd;
reduce  our  existing  estimated  mineral  resources  and  reserves  by  removing  material  from  these  estimates  that
could not be economically processed at lower gold prices;
reduce the potential for future revenues from gold projects in which we have an interest;
reduce funds available to operate our business; and
reduce the market value of our assets.

Industry consolidation could result in the acquisition of a control position in the Company for less than fair
value.

Consolidation  within  the  industry  is  a  growing  trend.  As  a  result  of  the  broad  range  of  market  and  industry  factors
including the price of gold, we believe the current market value of the common shares in the capital of the Company (the
“Common  Shares”)  does  not  reflect  the  fair  value  of  the  Company’s  assets.  These  conditions  could  result  in  the
acquisition of a control position, or attempted acquisition of a control position in the Company at what we believe to be
less than fair value. This could result in substantial costs to us and divert our management’s attention and resources. A
completed acquisition could result in realized losses of shareholder value.

We may be unable to raise additional capital on favorable terms, or at all.

Our  exploration  and,  if  warranted,  development  activities  and  the  construction  and  start-up  of  any  mining  operation
require substantial amounts of capital. In order to develop Mt Todd, acquire attractive gold projects, and/or continue our
business,  we  will  have  to  secure  a  development  partner  or  otherwise  source  sufficient  equity,  debt  or  other  forms  of
capital,  raise  additional  funds  from  the  sale  of  non-core  assets  and  /  or  seek  additional  sources  of  capital  from  other
external sources. There can be no assurance that we will be successful in securing a development partner or otherwise
raising  additional  capital  on  acceptable  terms,  including  the  cost  of  such  capital  and  other  conditions  of  financing
arrangements that impose restrictive covenants and security interests that may affect the Company’s ability to operate as
intended and ultimately its ability to continue as a going concern. If we cannot raise sufficient additional capital, we may
be  required  to  substantially  reduce  or  cease  operations,  any  of  which  may  affect  our  ability  to  continue  as  a  going
concern.

16

Table of Contents

We face intense competition in the mining industry.

The  mining  industry  is  intensely  competitive  in  all  of  its  phases.  Some  of  our  competitors  are  much  larger,  established
companies  with  greater  financial  and  technical  resources  than  ours.  We  compete  with  other  companies  for  attractive
mining properties, for capital, for equipment and supplies, for outside services and for qualified managerial and technical
employees.  Access  to  financing,  equipment,  supplies,  skilled  labor  and  other  resources  may  also  be  affected  by
competition from non-mining related commercial sectors. If we are unable to raise sufficient capital, we will be unable to
execute exploration and development programs or such programs may be reduced in scope. Competition for equipment
and  supplies  could  result  in  shortage  of  necessary  supplies  and/or  increased  costs.  Competition  for  outside  services
could result in increased costs, reduced quality of service and/or delays in completing services. If we cannot successfully
retain or attract qualified employees, our ability to advance the development of Mt Todd, to attract necessary financing, to
meet all of our environmental and regulatory responsibilities, or to take opportunities to improve our business, could be
negatively  affected.  This  could  have  a  material  adverse  effect  on  our  business  prospects,  results  of  operations,  cash
flows and financial condition.

The occurrence of events for which we are not insured may affect our cash flow and overall profitability.

We  maintain  insurance  policies  that  mitigate  certain  risks  related  to  our  operations.  This  insurance  is  maintained  in
amounts  that  we  believe  to  be  reasonable  based  on  the  circumstances  surrounding  each  identified  risk.  However,  we
may  elect  to  limit  or  not  have  insurance  for  certain  risks  because  of  the  high  premiums  associated  with  insuring  those
risks  or  for  various  other  reasons.  In  other  cases,  insurance  may  not  be  available  for  certain  risks.  We  do  not  insure
against political risk. Occurrence of events for which we are not insured adequately, or at all, could result in significant
losses that could materially adversely affect our financial condition and our ability to fund our business.

Currency fluctuations may adversely affect our costs.

We  have  material  property  interests  in  Australia.  Most  costs  in  Australia  are  incurred  in  the  local  currency.  The
appreciation  of  the  Australian  dollar,  if  any,  against  the  U.S.  dollar  effectively  increases  our  cost  of  doing  business  in
Australia. This could have the effect of increasing the amount of capital required to continue to explore and develop Mt
Todd, and/or reducing the pace at which it is developed.

The  Company  is  likely  a  “passive  foreign  investment  company,”  which  will  likely  have  adverse  U.S.  federal
income tax consequences for U.S. shareholders.

U.S.  shareholders  of  our  Common  Shares  should  be  aware  that  the  Company  believes  it  was  classified  as  a  passive
foreign  investment  company  (“PFIC”)  up  to  and  including  the  taxable  year  ended  December  31,  2021,  and  based  on
current business plans and financial projections, management believes there is a significant likelihood that the Company
will be a PFIC during the current taxable year. If the Company is a PFIC for any year during a U.S. shareholder’s holding
period,  then  such  U.S.  shareholder  generally  will  be  required  to  treat  any  gain  realized  upon  a  disposition  of  Common
Shares,  or  any  so-called  “excess  distribution”  received  on  their  Common  Shares,  as  ordinary  income,  and  to  pay  an
interest charge on a portion of such gain or distributions, unless the shareholder makes a timely and effective “qualified
electing  fund”  (“QEF  Election”)  or  a  “mark-to-market”  election  with  respect  to  the  Common  Shares.  A  U.S.  shareholder
who  makes  a  QEF  Election  generally  must  report  on  a  current  basis  its  share  of  the  net  capital  gain  and  ordinary
earnings  for  any  year  in  which  the  Company  is  PFIC,  whether  or  not  the  Company  distributes  any  amounts  to  its
shareholders.  U.S.  shareholders  should  be  aware  that  there  can  be  no  assurance  that  the  Company  will  satisfy  record
keeping requirements that apply to a QEF Election, or that the Company will supply U.S. shareholders with information
that such U.S. shareholders require to report under the QEF Election rules, in event that the Company is a PFIC and a
U.S. shareholder wishes to make a QEF Election. Thus, U.S. shareholders may not be able to make a QEF Election with
respect to their Common Shares. A U.S. shareholder who makes the mark-to-market election generally must include as
ordinary income each year the excess of the fair market value of the Common Shares over the taxpayer’s basis therein.
This  paragraph  is  qualified  in  its  entirety  by  the  discussion  below  in  “Item  5.  Market  for  Registrant’s  Common  Equity,
Related  Stockholder  Matters  and  Issuer  Purchases  of  Equity  Securities  -  “Certain  U.S.  Federal  Income  Tax
Considerations for U.S. Residents.” Each U.S.

17

Table of Contents

shareholder  should  consult  his  or  her  own  tax  advisor  regarding  the  U.S.  federal,  U.S.  state  and  local,  and  foreign  tax
consequences of the PFIC rules and the acquisition, ownership, and disposition of Common Shares.

Certain  directors  and  officers  may  serve  as  directors  and  officers  of  other  companies  in  the  natural  resources
sector.

While  there  are  no  known  existing  or  potential  conflicts  of  interest  between  Vista  and  any  of  its  directors  or  officers,
certain of the directors and officers do or may serve as directors and officers of other natural resource companies and
therefore it is possible that a conflict may arise between their duties as a director or officer of Vista and their duties as a
director  or  officer  of  such  other  companies.  The  directors  and  officers  of  Vista  are  aware  of  the  existence  of  laws
governing accountability of directors and officers for corporate opportunity and disclosure of conflicts of interest. Should
any director or officer breach the duties imposed upon them by applicable laws, such actions or inactions could have a
material  adverse  effect  on  our  business  prospects,  results  of  operations,  cash  flows,  financial  condition  and  corporate
reputation.

Direct and indirect consequences of the COVID-19 pandemic may have material adverse consequences.

The  COVID-19  pandemic  is  having  a  material  adverse  effect  on  the  global  economy,  which  has  impacted  the  natural
resource sector and Vista. Vista incurred minimal health and safety costs. However, we incurred other corporate and Mt
Todd costs while certain corporate objectives, including efforts to secure a strategic development partner or other form of
transaction  were  extended  due  to  travel  restrictions.  Pandemic  conditions  may  also  disrupt  our  access  to  supplies  and
services. Evolving conditions related to COVID-19 could ultimately have a material adverse effect on both short-term and
long-term  financial  position  and  results  of  operations.  To  the  extent  the  COVID-19  pandemic  adversely  affects  our
business  and  financial  results,  it  could  also  heighten  the  effect  many  of  the  other  risks  described  in  this  “Risk  Factors”
section. Because of uncertainties relating to the COVID-19 pandemic, it is not currently possible to estimate the impact of
the pandemic on our business. However, these effects could have a material impact on our operations.

Industry Risks

Calculations of mineral resources and mineral reserves are estimates only and subject to uncertainty.

The estimating of mineral resources and mineral reserves is an imprecise process and the accuracy of such estimates is
a  function  of  the  quantity  and  quality  of  available  data,  the  assumptions  used  and  judgments  made  in  interpreting
engineering and geological information and estimating future capital and operating costs. There is significant uncertainty
in any reserve or resource estimate, and the economic results of mining a mineral deposit may differ materially from the
estimates as additional data are developed or interpretations change.

Estimated mineral resources and mineral reserves may be materially affected by other factors.

In  addition  to  uncertainties  inherent  in  estimating  mineral  resources  and  mineral  reserves,  other  factors  may  adversely
affect  estimated  mineral  resources  and  mineral  reserves.  Such  factors  may  include  but  are  not  limited  to  metallurgical,
environmental, permitting, legal, title, taxation, socio-economic, marketing, political, gold prices, and capital and operating
costs. Any of these or other adverse factors may reduce or eliminate estimated mineral reserves and mineral resources
and could have a material adverse effect on our business, prospects, results of operations, cash flows, financial condition
and corporate reputation.

Feasibility studies are estimates only and subject to uncertainty.

Feasibility studies such as our 2022 FS are used to determine the economic viability of an ore deposit, as are preliminary
feasibility studies and preliminary economic assessments. Feasibility studies are the most detailed studies and reflect a
higher level of confidence in the estimated production rates, and capital and operating costs. Generally accepted levels of
confidence are plus or minus 15% for feasibility studies, plus or minus 25-30% for preliminary feasibility studies and plus
or minus 35-40% for preliminary economic assessments. These thresholds reflect the levels of confidence that exist at
the time the study is completed. Subsequent changes to metal prices, foreign exchange rates (if applicable), reclamation
requirements,  operating  and  capital  costs  may  cause  actual  results  of  economic  viability  to  differ  materially  from  these
estimates. Results of any subsequent Mt Todd feasibility study may be less favorable than the current 2022 FS.

18

Table of Contents

Mining companies are increasingly required to consider and provide benefits to the communities and countries
in which they operate, and are subject to extensive environmental, health and safety laws and regulations.

As a result of public concern about the real or perceived detrimental effects of economic globalization and global climate
impacts  and  other  adverse  environmental  effects  resulting  from  the  operation  of  extractive  industries,  businesses  in
general and the mining industry in particular face increasing public scrutiny of their activities. These businesses are under
pressure  to  demonstrate  that  as  they  seek  to  generate  satisfactory  returns  on  investment  to  shareholders,  other
stakeholders,  including  employees,  governments,  indigenous  peoples,  communities  surrounding  operations  and  the
countries in which they operate, such constituencies benefit and will continue to benefit from their commercial activities.
The  potential  consequences  of  these  pressures  include  reputational  damage,  legal  suits,  increased  costs,  increased
social  investment  obligations,  difficulty  in  acquiring  permits,  and  increased  taxes  and  royalties  payable  to  governments
and communities.

Mining exploration, development and operating activities are inherently hazardous.

Mineral exploration and development involves many risks that even a combination of experience, knowledge and careful
evaluation may not be able to overcome. Operations in which we have direct or indirect interests will be subject to all the
hazards and risks normally incidental to exploration, development and production of gold and other metals, any of which
could result in work stoppages, damage to property, physical harm and possible environmental damage. The nature of
these risks is such that liabilities might exceed any liability insurance policy limits. It is also possible that the liabilities and
hazards might not be insurable, or, we could elect not to be insured against such liabilities due to high premium costs or
other reasons, or our insurance for a particular event or circumstance might be insufficient, in which event we could incur
significant costs that could have a material adverse effect on our business prospects, results of operations, cash flows,
financial condition and corporate reputation.

Regulations and pending legislation involving climate change could result in increased operating costs.

Gold  production  is  energy  intensive,  resulting  in  a  significant  carbon  footprint.  A  number  of  governments  and/or
governmental  bodies  have  introduced  or  are  contemplating  regulatory  changes  in  response  to  the  potential  impact  of
climate change. This type of legislation and possible future legislation and increased regulation regarding climate change
could impose significant costs related to increased energy requirements, capital equipment, environmental monitoring and
reporting and other costs to comply with such regulations.

Pending initiatives involving taxation could result in increased tax and operating costs.

There  is  growing  attention  from  the  media  and  the  public  on  perceived  international  tax  avoidance  techniques  which
could result in escalating rates of poverty, inequality and unemployment in host countries. Initiatives like the Base Erosion
and Profit Shifting project being led by the Organization for Economic Cooperation and Development aim to reform the
system  of  international  taxation  to  minimize  international  tax  avoidance  techniques.  This  initiative  and  possible  future
initiatives  could  result  in  increased  tax  expense  and  related  compliance  costs  for  Mt  Todd  or  other  future  mining
operations.

Securities Risks

Our share price may be volatile and your investment in our Common Shares could suffer a decline in value .

Broad  market  and  industry  factors  may  adversely  affect  the  price  of  our  Common  Shares,  regardless  of  our  actual
operating  performance.  Factors  that  could  cause  fluctuation  in  the  price  of  our  Common  Shares  may  include,  among
other things:

●
●

●
●
●

changes in financial estimates by us or by any securities analysts who might cover our stock market performance;
stock market price and volume fluctuations of other publicly traded companies and, in particular, those that are in
the mining industry;
speculation about our business in the press or the investment community;
conditions or trends in our industry or the economy generally;
decreases in the prices of gold;

19

Table of Contents

●
●
●
●

announcements by us or our competitors of significant acquisitions, strategic partnerships or divestitures;
inability to find a development partner, investor of lender on acceptable terms for the development of Mt Todd;
additions or departures of key personnel; and
sales of our Common Shares, including sales by our directors, officers or significant stockholders.

In the past, securities class action litigation has often been instituted against companies following periods of volatility in
their stock price. This type of litigation could result in substantial costs to us and divert our management’s attention and
resources.

There may be limited liquidity for our warrants.

There is no market through which our outstanding warrants may be sold. It is not possible to predict the price at which the
warrants will trade in the secondary market or whether such market will be liquid or illiquid. To the extent warrants are
exercised,  the  number  of  warrants  outstanding  will  decrease,  resulting  in  diminished  liquidity  for  such  remaining
outstanding  warrants.  A  decrease  in  the  liquidity  of  the  warrants  may  cause,  in  turn,  an  increase  in  the  volatility
associated  with  the  price  of  the  warrants.  To  the  extent  that  the  warrants  become  illiquid,  an  investor  may  have  to
exercise such warrants to realize value.

Potential dilution.

Our constating documents allow us to issue an unlimited number of common shares for such consideration and on such
terms  and  conditions  as  shall  be  established  by  the  board  of  directors,  in  many  cases,  without  the  approval  of
shareholders.  We  may  issue  common  shares  in  offerings  from  treasury  (including  through  the  sale  of  securities
convertible into or exchangeable for common shares) and on the exercise of stock options or other securities exercisable
for common shares. We cannot predict the size of future issuances of common shares or the effect that future issuances
and sales of common shares will have on the market price of the common shares. Issuances of a substantial number of
additional  common  shares,  or  the  perception  that  such  issuances  could  occur,  may  adversely  affect  prevailing  market
prices for the common shares. With any additional issuance of common shares, investors will suffer dilution to their voting
power and we may experience dilution.

Holders of our common shares may not receive dividends.

We have not historically declared cash dividends on our common shares. Holders of our common shares are entitled to
receive only such dividends as our Board of Directors may declare out of funds legally available for such payments. Our
ability to pay dividends will be subject to our future earnings, capital requirements and financial condition, as well as our
compliance with covenants related to any future indebtedness and would only be declared in the discretion of our Board
of Directors.

20

 
 
 
Table of Contents

The Company may experience cybersecurity breaches.

General Risks

Regular access to and security of information technology systems are critical to Vista’s operations. To Vista’s knowledge,
it  has  not  experienced  any  material  losses  relating  to  disruptions  to  its  information  technology  systems.  Vista  has
implemented  policies,  controls  and  practices  to  manage  and  safeguard  Vista  and  its  stakeholders  from  internal  and
external cybersecurity threats and to comply with changing legal requirements and industry practice. Cyber risks cannot
be  fully  mitigated  and  these  threats  are  continuing  to  evolve.  Therefore,  Vista  cannot  assure  that  its  information
technology  systems  are  fully  protected  from  cybercrime  or  that  the  systems  will  not  be  inadvertently  compromised,  or
without  failures  or  defects.  Potential  disruptions  to  Vista’s  information  technology  systems,  including,  without  limitation,
security breaches, power loss, theft, computer viruses, cyber-attacks, natural disasters, and noncompliance by third party
service providers and inadequate levels of cybersecurity expertise and safeguards of third party information technology
service  providers,  may  adversely  affect  the  operations  of  Vista  as  well  as  present  significant  costs  and  risks  including,
without  limitation,  loss  or  disclosure  of  confidential,  proprietary,  personal  or  sensitive  information  and  third  party  data,
material  adverse  effect  on  its  financial  performance,  compliance  with  its  contractual  obligations,  compliance  with
applicable  laws,  damaged  reputation,  remediation  costs,  potential  litigation,  regulatory  enforcement  proceedings  and
heightened regulatory scrutiny.

The Company is subject to anti-bribery and anti-corruption laws.

Vista’s operations are governed by, and involve interactions with, many levels of government in several countries. Vista is
required to comply with anti-corruption and anti-bribery laws in the countries in which we conduct our business. In recent
years, there has been a general increase in both the frequency of enforcement and the severity of penalties under such
laws,  resulting  in  greater  scrutiny  and  punishment  to  companies  convicted  of  violating  anti-corruption  and  anti-bribery
laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its contractors and
third-party agents. Although we have adopted internal control policies to mitigate such risks, there can be no assurance
that our internal control policies and procedures will always protect us from recklessness, fraudulent behavior, dishonesty
or  other  inappropriate  acts  committed  by  our  affiliates,  employees  or  agents  and  such  measures  may  not  always  be
effective in ensuring that we, our employees, contractors or agents will comply strictly with such laws. If we find ourselves
subject to an enforcement action or are found to be in violation of such laws, this could lead to civil and criminal fines and
penalties, investigation and litigation, and loss of operating licenses or permits, resulting in a material adverse effect on
our reputation and results of operations.

Our business is subject to evolving corporate governance and public disclosure regulations that have increased
both our compliance costs and the risk of noncompliance.

We  are  subject  to  changing  rules  and  regulations  promulgated  by  a  number  of  governmental  and  self-regulated
organizations, including the British Columbia Securities Commission, the SEC, the Toronto Stock Exchange (the “TSX”),
the NYSE American, and the Financial Accounting Standards Board. These rules and regulations continue to evolve in
scope and complexity and many new requirements have been created in response to laws enacted by the United States
Congress,  making  compliance  increasingly  more  difficult  and  uncertain,  which  could  have  an  adverse  effect  on  our
reputation and our stock price.

ITEM 1B. UNRESOLVED STAFF COMMENTS .

Not applicable.

21

 
Table of Contents

ITEM 2. PROPERTIES.

References  to  USD  or  $  refer  to  United  States  currency  and  AUD  or  A$  refer  to  Australian  currency,  all  in  thousands,
unless specified otherwise.

Qualified Persons

The  scientific  and  technical  disclosures  about  Mt  Todd  in  this  annual  report  on  Form  10-K  have  been  reviewed  and
approved by John W. Rozelle, Senior Vice President of Vista. Mr. Rozelle is a qualified person as defined by S-K 1300
and NI 43-101. For a description of the key assumptions, parameters and methods used to estimate mineral reserves and
mineral  resources  included  in  this  Form  10-K,  as  well  as  data  verification  procedures  and  a  general  discussion  of  the
extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical,
marketing  or  other  relevant  factors,  please  review  the  Technical  Report  Summary  for  the  Mt  Todd  project  which  is
included as an exhibit to, and incorporated by reference into, this Form 10-K.

Mt Todd Gold Project, Northern Territory, Australia

Summary Disclosure

The Company has only one material mining property, the Mt Todd project located in the Northern Territory of Australia.
We hold Mt Todd through our wholly-owned subsidiary Vista Gold Australia Pty. Ltd. (“Vista Gold Australia”).

Technical Report Summary

The 2022 FS for Mt Todd is the technical report summary, prepared pursuant to S-K 1300, that was filed on EDGAR on
February 24, 2022 and is entitled “S-K 1300 Technical Report Summary - Mt Todd Gold Project - 50,000 tpd Feasibility
Study – Northern Territory, Australia” with an effective date of December 31, 2021 and an issue date of February 9, 2022
(the  “2022  FS”).  A  companion  feasibility  study  for  Canadian  purposes,  pursuant  to  NI  43-101,  was  filed  on  SEDAR  on
February 24, 2022 and is entitled “NI 43-101 Technical Report - Mt Todd Gold Project - 50,000 tpd Feasibility Study –
Northern Territory, Australia” with an effective date of December 31, 2021 and an issue date of February 9, 2022.

The technical data and economic conclusions of these reports are identical, with minor differences between the reports
resulting  only  from  the  respective  disclosure  requirements  of  S-K  1300  and  NI  43-101.  The  reports  were  prepared  by
Sabry  Abdel  Hafez,  Ph.D.,  P.Eng.;  Rex  Clair  Bryan,  Ph.D.,  SME  RM;  Thomas  L.  Dyer,  P.E.,  SME  RM;  Amy  Hudson,
Ph.D.,  CPG,  REM;  April  Hussey,  P.E.;  Chris  Johns,  M.Sc.,  P.Eng.;  Max  Johnson,  P.E.;  Deepak  Malhotra,  Ph.D.,  SME
RM;  Zvonimir  Ponos,  BE,  MIEAust,  CPeng,  NER;  Vicki  J.  Scharnhorst,  P.E.,  LEED  AP;  and  Keith  Thompson,  CPG,
member AIPG, each of whom is a qualified person under S-K 1300 and NI 43-101.

The following description of Mt Todd has been sourced, in part, from the 2022 FS and readers should consult the 2022
FS  to  obtain  further  particulars  regarding  Mt  Todd.  The  2022  FS  is  available  for  review  at  www.sec.gov  and  under  our
profile at www.sedar.com. The 2022 FS is not incorporated by reference into this annual report on Form 10-K.

Certain capitalized terms in this section not otherwise defined have the meanings ascribed to them in the 2022 FS.

Project Location and Access

Mt Todd is located 56 kilometers by road northwest of Katherine, NT, Australia, and approximately 290 kilometers by road
southeast of Darwin. Access is by existing paved public roads and approximately four kilometers of paved private road.
We control and maintain the private paved road.

The  area  has  a  sub-tropical  climate  with  a  distinct  wet  season  and  dry  season.  The  area  receives  most  of  its  rainfall
between  the  months  of  January  and  March.  Temperatures  are  moderate,  allowing  for  year-round  mining  operations.
Topography  is  relatively  flat.  The  tenements  encompass  a  variety  of  habitats  forming  part  of  the  northern  Savannah
woodland region,

22

Table of Contents

which is characterized by eucalypt woodland with tropical grass understories. Surface elevations are approximately 130 to
160 meters above sea level in the area of the previous and planned mine plant site and waste rock dumps.

Project Stage

The Mt Todd project is a development stage property with proven and probable mineral reserves.

Feasibility Study Results

The  2022  FS  evaluates  a  50,000  tpd  project  (“50,000  tpd  Project”)  that  optimizes  payable  gold,  capital  efficiency,
operating costs and net present value (“NPV”).

The 50,000 tpd Project highlights include:

● Estimated proven and probable mineral reserves of 6.98 Moz of gold (280 Mt at 0.77 g Au/t) at a cut-off grade

of 0.35 g Au/t(1)(2);

● Average  annual  production  of  395,000  ounces  of  gold  over  the  mine  life,  including  average  annual
production of 479,000 ounces of gold per year during the first seven years of operations following ramp-up
and commissioning;

23

Table of Contents

●

Life of Mine average cash costs of $817 per ounce, including average cash costs of $752 per ounce during
the first seven years of operations following ramp-up and commissioning;

● A 16-year operating life;

●

Initial capital requirements of $892 million which assume an owner-operated mining fleet, power generated
on-site by a third-party, and a locally based employee workforce;

● After-tax NPV 5% of $999.5 million and internal rate of return (“IRR”) of 20.6% at a gold price of $1,600 per

ounce and an AUD:USD exchange rate of 0.71; and

● After-tax NPV5% of $1,458 million and IRR of 26.7% at a price of $1,800 per ounce of gold and an AUD:USD

exchange rate of 0.71 based on the Gold Price and Foreign Exchange Sensitivity Table below.

(1) Note  to  investors:  Proven  and  probable  mineral  reserves  are  estimated  in  accordance  with  S-K  1300  and  CIM  Definition

Standards.

(2) See “Item 1. Business – Cautionary Note to Investors Regarding Estimates of Measured, Indicated and Inferred Resources and

Proven and Probable Mineral Reserves” in this annual report on Form 10-K for additional information.

Key statistics of the 50,000 tpd Project are presented in the table below:

Years 1-7(1)

Life of Mine (16 years)(2)

Average Plant Feed Grade (g Au/t) (3)
Average Annual Gold Production (koz)
Payable Gold Total (koz)
Average Recovery (%)
Cash Costs ($/oz)(4)
AISC ($/oz)(5)
Strip Ratio (waste:ore)
Initial Capital ($ millions)
After-tax NPV  5% ($ millions)
After-tax IRR
After-tax Payback (Months)

$
$

 1.01
 479
 3,353

 92.2 %  
 752
 860
 2.77

$
$

$
$

 0.84
 395
 6,313

 91.6 %  
 817
 928
 2.51
 892
 999.5

 20.6 %  
 47

Note: Table economics presented using $1,600/oz gold and a A$1.00 :$0.71 exchange.

(1) Years 1-7 start after the 6-month commissioning and ramp up period.
(2) Life of mine is from start of commissioning and ramp up through the final closure.
(3) Post-sorted grinding circuit feed grade.
(4) Cash Costs per ounce is a non-U.S. GAAP financial measure; see Item 7. Management’s Discussion and Analysis of
Financial Condition and Results of Operations – Non-U.S. GAAP Financial Measures for additional disclosure.
(5) All-in Sustaining Costs (“AISC”) per ounce is a non-U.S. GAAP financial measure; see Item 7. Management’s
Discussion and Analysis of Financial Condition and Results of Operations – Non-U.S. GAAP Financial Measures for
additional disclosure.

The  following  chart  presents  the  50,000  tpd  Project  annual  cash  flow  using  $1,600/oz  gold  and  an  A$1.00:$0.71
exchange rate:

24

 
 
 
 
 
 
 
Table of Contents

The  following  table  provides  additional  details  of  the  50,000  tpd  Project  economics  at  variable  gold  price  and  foreign
exchange assumptions:

Foreign
Exchange
Rate
($/A$)
0.74
0.71
0.68

Gold Price and Foreign Exchange Rate Sensitivity Table ($ Millions)

Gold Price

$1,300

$1,400

$1,500

$1,600

$1,700

$1,800

$1,900

NPV5% IRR NPV5% IRR NPV5% IRR NPV5% IRR NPV5% IRR NPV5% IRR NPV5% IRR
15.5% $911
$214
19.0% $1,144 22.1% $1,372 25.0% $1,589 27.7%
17.3% $999.5† 20.6%† $1,229 23.7% $1,458 26.7% $1,674 29.4%
$304
18.9% $1,085 22.3% $1,313 25.7% $1,543 28.5% $1,758 31.3%
$393

8.6% $453
10.2% $541
11.9% $626

12.4% $674
14.0% $762
15.6% $851

† Reflects the assumptions used for the economic analysis in the 2022 FS.

25

Table of Contents

Key capital expenditures for the 50,000 tpd Project initial and sustaining capital requirements are:

Capital Expenditures ($ Millions, except per ounce amount)

Mining
Process Plant
Project Services
Project Infrastructure
Site Establishment & Early Works
Management, Engineering, EPCM Services
Preproduction Costs
Contingency
Sub-Total
Asset Sale and Salvage
Total Capital

Total Capital per Payable Ounce of Gold

Initial
Capital
 81
$
 474
 56
 45
 24
 100
 27
 86
$  892
 —
$  892

$  141

     Sustaining  
Capital

$

$

$

$

 531
 28
 89
 8
 —
 —
 —
 44
 700
 (37)
 663 (1)

 105 (1)

Note: Amounts may not add to total due to rounding. Asset sale and salvage value assumptions include end of life re-sale values for
mining and processing equipment; and recycle value for steel and pipe from the process plant and other facilities.

(1) Net of asset sales.

The 2022 FS contemplates an owner-operated mining fleet at initial capital of $86 million and sustaining capital of $565
million,  inclusive  of  contingency.  The  study  assumes  the  equipment  will  be  sold  when  retired  from  operations,  at  an
estimated salvage value of $21 million. Fleet operators, along with other employees are expected to be community based,
providing benefits by lower camp-related capital and operating costs. Mining equipment would be maintained through a
full  maintenance  and  repair  contract  with  the  manufacturer’s  authorized  dealer.  Overall,  this  approach  is  expected  to
produce lower operating costs compared to contract mining.

The 2022 FS utilizes the efficiency of ore sorting across a broad range of head grades, the natural concentration of gold
in the screen undersize material prior to sorting, the efficiency of fine grinding and the resulting improved gold recoveries
at a final grind size of P80 40 µm, and the selection of FLSmidth’s VXP mill as the preferred fine grinding mill.

The  50,000  tpd  Project  incorporates  purchasing  electrical  power  from  a  third-party.  The  power  plant  will  be  owned,
operated, and provide power on a dedicated contract.

The following table presents a breakdown of 50,000 tpd Project operating costs.

Operating Cost 

First 7 Years

Life of Mine Cost 

Mining
Processing
Site General and Administrative
Jawoyn Royalty(1)
Water Treatment
Tailings Management
Refining Costs(1)
Total Cash Costs(2)

$

     Per ore tonne     
processed
 8.52
 9.39
 1.06
 0.86
 0.26
 0.08
 0.09
 20.28

$

Per ounce
$  316
 348
 39
 32
 10
 3
 3
$  752

$

     Per ore tonne     
processed
 6.79
 9.44
 0.99
 0.72
 0.29
 0.08
 0.08
 18.40

$

Per ounce 
$  302
 419
 44
 32
 13
 4
 3
$  817

Note: Table may not add to total due to rounding

(1) Jawoyn Royalty and refining costs calculated at $1,600 per ounce gold and an A$1.00 : $0.71 exchange rate.
(2) Total Cash Costs is a non-U.S. GAAP financial measure; see Item 7. Management’s Discussion and Analysis of Financial

Condition and Results of Operations – Non-U.S. GAAP Financial Measures for additional disclosure.

26

    
 
 
 
Table of Contents

In  November  2020,  we  modified  our  agreement  with  the  Jawoyn.  The  modified  agreement  provides  the  Jawoyn  with  a
gross  proceeds  royalty  (“GPR”)  ranging  between  0.125%  and  2.0%,  depending  on  prevailing  gold  prices  and  foreign
exchange rates, instead of its previous right to become a 10% participating joint venture partner in Mt Todd. The modified
agreement did not affect the previously agreed 1.0% GPR. The combined GPR range is now from 1.125% to 3.0% and is
reflected in the table above.

The  life  of  mine  production  schedule  contemplates  280.4  million  tonnes  of  ore  containing  an  estimated  6.98  million
ounces  of  gold  at  an  average  grade  of  0.77  g  Au/t  to  be  processed  over  a  16-year  operating  life  of  the  Project.  Total
recovered  gold  is  expected  to  be  6.31  million  ounces.  Average  annual  gold  production  over  the  life  of  the  Project  is
expected  to  be  395,000  ounces,  which  includes  averaging  479,000  ounces  during  the  first  seven  years  of  commercial
operations.  Commercial  operations  are  anticipated  to  begin  after  two  years  of  construction  and  a  six-month
commissioning and ramp-up period

The following table summarizes the production schedule. The shaded portion of the table highlights the impact of sorting
which  reduces  the  tonnage  processed  by  10%,  increases  the  processed  grade  by  a  similar  percentage,  and  results  in
cost savings in the grinding, leaching and tailings handling.

Years

Pit Ore
Mined (kt)

Waste
Mined (kt)

Ore
Crushed
(kt)

Crushed
Grade
(g/t)

Contained
Ounces
(kozs)

Ore to 

CIP        
(Post 

Sorting)      

CIP 

Grade       
(g/t)

Contained
Ounces
(kozs)

Gold
Produced
(kozs)

Recovery
(%)

(1)
1 †
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 ‡
17 ‡
Total

7,188
18,216
30,578
19,696
15,218
27,591
25,499
13,229
7,779
13,866
14,523
20,830
18,523
11,307
13,829
9,149
0
0
267,021

14,066
25,904
38,623
63,199
69,774
66,264
74,510
77,291
71,277
59,499
50,082
40,490
13,685
4,388
1,866
412
0
0
671,331

0
12,334
17,750
17,750
17,799
17,750
17,823
17,750
17,774
17,774
17,750
17,750
17,774
17,774
17,750
17,750
16,710
2,612
280,375

0
1.10
0.88
1.04
0.66
0.79
1.03
0.97
0.69
0.52
0.55
0.61
0.72
0.76
0.79
0.78
0.64
0.54
0.77

0
436
503
594
378
451
591
554
392
295
312
347
410
433
448
446
344
45
6,979

(kt)
0
11,100
15,975
15,975
16,019
15,975
16,041
15,975
15,997
15,997
15,975
15,975
15,997
15,997
15,975
16,120
15,968
2,612
253,673

0.00
1.21
0.97
1.14
0.73
0.87
1.13
1.06
0.75
0.57
0.60
0.67
0.79
0.83
0.86
0.85
0.66
0.54
0.84

0
431
497
587
373
445
583
546
386
291
308
343
404
428
442
440
341
45
6,891

0
399
458
542
341
408
539
504
352
261
277
311
370
391
406
403
310
41
6,313

0
92.6%
92.1%
92.5%
91.3%
91.7%
92.4%
92.3%
91.2%
89.8%
90.1%
90.7%
91.4%
91.6%
91.7%
91.6%
90.7%
89.8%
91.6%

Note: Amounts may not add due to rounding.

† Six-month startup and commissioning period ahead of full production
‡ Total milled ore includes material from the existing heap leach pad that is processed in years 16 and 17.

Mineral Resources and Mineral Reserves Estimates

The table below presents the estimated mineral resources for the Project. The effective  date of the resource estimates is
December 31, 2021. The following mineral resources and mineral reserves were prepared in accordance with both S-K
1300 standards and CIM Definition Standards.

27

Table of Contents

Mt Todd Gold Project – Summary of Gold Mineral Resources at the End of the Fiscal Year Ended December 31,
2021 based on US$1,300/oz. Gold

Batman Deposit

Heap Leach Pad

Quigleys Deposit

Total

Tonnes
(000s)

 77,725
 200,112

Grade
(g Au/t)

 0.88
 0.80

Contained
Ounces
(000s)

 2,191
 5,169

Tonnes
(000s)

 —
 13,354

Grade
(g Au/t)

 —
 0.54

 277,837  
 61,323  

 0.82  
 0.72  

 7,360

 1,421

 13,354  
 —  

 0.54  
 —  

Contained
Ounces
(000s)

 —
 232

 232

 —

Tonnes
(000s)

 594
 7,301

Grade
(g Au/t)

 1.15
 1.11

 7,895  
 3,981  

 1.11  
 1.46  

Contained
Ounces
(000s)

Tonnes
(000s)

Grade
(g Au/t)

Contained  
Ounces
(000s)

 22
 260

 282

 187

 78,319
 220,767  

 0.88
 0.80  

 2,213
 5,661

 299,086  
 65,304  

 0.82  
 0.77  

 7,874

 1,608

Measured
Indicated
Measured
&
Indicated
Inferred

Notes:

● Measured & indicated resources include proven and probable reserves.
●

Batman and Quigleys resources are quoted at a 0.40g-Au/t cut-off grade. Heap Leach resources are the average grade of
the heap, no cut-off applied.
Batman:  Resources  constrained  within  a  US$1,300/oz  gold  WhittleTM  pit  shell.  Pit  parameters:  Mining  Cost
US$1.50/tonne, Milling Cost US$7.80/tonne processed, G&A Cost US$0.46/tonne processed, G&A/Year 8,201 K US$, Au
Recovery, Sulfide 85%, Transition 80%, Oxide 80%, 0.2g-Au/t minimum for resource shell.

●

● Quigleys:  Resources  constrained  within  a  US$1,300/oz  gold  WhittleTM  pit  shell.  Pit  parameters:  Mining  cost
US$1.90/tonne,  Processing  Cost  US$9.779/tonne  processed,  Royalty  1%  GPR,  Gold  Recovery  Sulfide,  82.0%  and
Ox/Trans 78.0%, water treatment US$0.09/tonne, Tailings US$0.985/tonne.

● Differences  in  the  table  due  to  rounding  are  not  considered  material.  Differences  between  Batman  and  Quigleys  mining

and metallurgical parameters are due to their individual geologic and engineering characteristics.

● Rex Bryan of Tetra Tech is the QP responsible for the Statement of Mineral Resources for the Batman, Heap Leach Pad

and Quigleys deposits.
Thomas Dyer of RESPEC is the QP responsible for developing the resource WhittleTM pit shell for the Batman Deposit.
The effective date of the Heap Leach, Batman and Quigleys resource estimate is December 31, 2021.

●
●
● Mineral  resources  that  are  not  mineral  reserves  have  no  demonstrated  economic  viability  and  do  not  meet  all  relevant

modifying factors.

The mine plan in the 2022 FS includes both proven and probable mineral reserves and estimated total recovered gold at
6.31 million ounces. The following table presents the estimated mineral reserves for the Project.

Mt Todd Gold Project – Summary of Gold Mineral Reserves  at the End of the Fiscal Year Ended December 31,
2021 based – 50,000 tpd, 0.35 g Au/t cut-off and $1,125 per ounce pit design

Batman Deposit

Heap Leach Pad

Total

     Contained     

     Contained     

     Contained  

     Tonnes      Grade      Ounces
(000s)

(g Au/t)

(000s)

     Tonnes      Grade      Ounces
(000s)

(g Au/t)

(000s)

Tonnes      Grade      Ounces
(000s)
(g Au/t)
(000s)

Proven
Probable
Proven & Probable
Economic analysis conducted only on proven and probable mineral reserves.

 81,277
 185,744
 267,021

 0.84  
 0.76  
 0.79  

 2,192
 4,555
 6,747

   13,354
   13,354

 —  

 —  
 0.54  
 0.54  

 —  

 232
 232

 81,277
   199,098
   280,375

 0.84  
 0.75  
 0.77  

 2,192
 4,787
 6,979

Notes:
●
●
● Deepak Malhotra is the QP responsible for reporting the heap-leach pad reserves.
●

Thomas L. Dyer, P.E., is the QP responsible for reporting the Batman Deposit Proven and Probable reserves.
Batman deposit reserves are reported using a 0.35 g Au/t cutoff grade.

Because all the heap-leach pad reserves are to be fed through the mill, these reserves are reported without a cutoff grade
applied.
The reserves point of reference is the point where material is fed into the mill.
The effective date of the mineral reserve estimates is December 31, 2021.

●
●

28

 
 
 
    
    
    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Table of Contents

Cautionary note to investors: Proven and probable mineral reserves are estimated in accordance with  each of S-
K 1300 and CIM Definition Standards. A number of risk factors may adversely affect estimated mineral reserves
and  mineral  resources,  any  of  which  may  result  in  a  reduction  or  elimination  of  reported  mineral  reserves  and
mineral resources. See “Item 1A. Risk Factors.”

The tables below show the resource classification criteria and variogram parameters for the Batman resource model.

Property Holdings

In 2006, through an agreement with Pegasus Gold Australia Pty. Ltd. (“Pegasus”), the NT Government, and the Jawoyn,
we acquired the concession rights and access to Mt Todd. Also in 2006, through an agreement with the NT Government,
we established the rights and obligations of both parties with respect to Mt Todd site care and maintenance and potential
future development. In 2017, the latter agreement was extended through the end of 2023.

Total land holdings controlled by Vista Gold Australia are approximately 1,705 Km 2. A map showing the location of the
mineral licenses (“MLs”) and exploration licenses (“ELs”) and a table with a list of MLs and ELs and the holding

29

Table of Contents

requirements are set out below. All of the estimated mineral resources are located within the boundaries of the MLs and
substantially all of the estimated mineral resources at Mt Todd are located in the Batman deposit.

The Batman and Quigleys deposits are located within the MLs. Should a deposit be discovered on the ELs, the portion of
the related EL would have to be converted to an ML before mining operations could start.

Mt Todd Land Holdings of Vista Gold Australia

Mineral Licenses

MLN 1070

MLN 1071

MLN 1127

MLN 31525

Subtotals

Surface
Area
     (Km2)     

Location
Description
 (UTM)
Mining

Location Date/

     Grant Date     Renewal Date    

 39.8

License Block March 5, 1993 March 4, 2043

 13.3

centered at

March 5, 1993 March 4, 2043

approximately March 5, 1993 March 4, 2043
September 3,
September 4,
2042
2017

 188555E, 
435665N

 0.8

 1.6

 55.4

Estimated Holding
Requirements
 Annual Rent &
Admin Fees
(thousands
of A$)
88
(due March 4)
29
(due March 4)
2
(due March 4)
4
(due September 3)

123

Estimated Holding
Requirements
 Annual Rent &
Admin Fees
(thousands
of A$)

Annual Work
 Requirement Expenditure/

Annual

(thousands
of A$)

Technical

    Reports Due

May 4/
May 4
May 4/
May 4
May 4/
May 4
May 4/
May 4

N/A

N/A

N/A

N/A
 -

Annual Work
 Requirement Expenditure/

Annual

(thousands
of A$)

Technical

    Reports Due

Exploration Licenses

Surface
Area
     (Km2)     

EL29882

EL29886

EL30898

EL32004

 556

 595

 187

 163

ELA32005
Subtotals

 149
 1,650

Location
Description
 (UTM)
Centered at
approximately
189100E,
84520000N
Centered at
approximately
200300E,
8452000N
Centered at
approximately
176100E,
8428700N
Centered at
approximately
164000E,
8430550N
Centered at
approximately
160180E,
8445150N

Location Date/

     Grant Date     Renewal Date    

September 16,
2013

September
15, 2023

September 16,
2013

September
15, 2023

May 3, 2016

May 2, 2022

39
(due September
15)

45
(due September
15)

13
(due May 2)

November 21,
2019

November 20,
2025

4
(due November 20)

125

77

12

30

Totals A$
Totals US$ (exchange rate of A$1.00 = $0.726 on December 31, 2021)

Under
application

Under
application

Under application
101

224
163

Under
application
244

244
177

The surface land in the area of the contiguous MLs and ELs (excluding EL 32004) is freehold land owned by the Jawoyn.
Because the Jawoyn have title to the land, such land is not part of the lands classified by the government as indigenous
lands, and as a result such lands are not subject to an Indigenous Land Use Agreement. Vista has a private agreement
with the Jawoyn for access to the land.

Annually,  we  are  required  to  submit  a  care  and  maintenance  MMP  to  the  DITT  that  details  work  to  be  done  on  the
property.  We  have  received  approval  for  all  work  done  on  the  Project  to  date  and  obtained  approval  for  the  EIS.  We
received our operational MMP in June 2021, which is the operating permit that sets out how mine operating strategy will
be

30

May 14/
May 14

May 14/
May 14

May 14/
May 14

Dec 19/
Jan 19

Under
application

    
    
Table of Contents

implemented throughout the mine life in compliance with the EIS and EPBC requirements. The MMP will be amended to
align with the design changes in the 2022 FS. The remaining permitting processes are relatively straight-forward and are
not expected to impede, to a material extent, our exploration and future development plans. Any future mining will require
sufficient surety bonding to fund mine closure.

Infrastructure

Because  Mt  Todd  was  an  operating  mine,  infrastructure  exists  that  reduces  initial  capital  expenditure  and  significantly
reduces capital risk related to infrastructure construction, which has been a major source of capital cost overruns in the
mining industry over the last decade. Existing mining infrastructure items include:

●
●

●

●
●
●

a tailings storage facility with capacity for approximately 80 million tonnes of additional material;
a fresh water storage reservoir that would receive a two-meter dam raise and would harvest stormwater expected
to be sufficient to provide process water for year-round operations for a 50,000 tpd operation;
a  natural  gas  pipeline  at  site  that  can  supply  sufficient  natural  gas  to  meet  the  Project’s  energy  requirements
which,  coupled  with  the  planned  power  generating  plant,  would  save  considerably  on  Project  operating  costs
compared to grid-supplied power;
a paved road to site;
current electrical connection to the NT electric grid; and
reduced earthworks costs due to the process plant location being the same as the previous process plant, which
has already been cleared and graded.

Other benefits of Mt Todd’s NT location include:

●
●
●

the Stuart highway – the main North / South highway in the NT is less than 10 kilometers from the Project site;
rail line parallel to the Stuart highway; and
the regional center of Katherine (population approximately 12,000) less than 40 kilometers from site and the NT
capital of Darwin less than 250 kilometers from the Project site, which has port access.

The area has both historical and current mining activity and therefore a portion of the skilled workforce should be able to
be  sourced  locally.  In  addition,  Katherine  offers  the  necessary  support  functions  that  are  typically  found  in  a  medium-
sized city with regard to supplies, accommodations, communications, etc.

Planned infrastructure for the site includes the following:

●

ammonium nitrate and fuel oil (ANFO) facility;

● mine support facilities (heavy vehicle (HV) workshop, lube farm, washdown and tire change, warehouse, fuel

farm, mining offices, core storage facility);

heap leach facility;

small accommodation camp for occasional contractor use;

●

●

● water treatment plant (WTP);

●

●

power supply;

pit dewatering;

● mine services;

●

●

●

communications;

gatehouse; and

expanded existing and additional TSF.

31

Table of Contents

Geological Setting, Mineralization, and Deposit Type

Mt  Todd  is  situated  within  the  southeastern  portion  of  the  Early  Proterozoic  Pine  Creek  Geosyncline.  Meta-sediments,
granitites,  basic  intrusives,  acidic  and  intermediate  volcanic  rocks  occur  within  this  geological  province.  Within  the  Mt
Todd region, the oldest outcropping rocks are assigned to the Burrell Creek Formation. These rocks consist primarily of
interbedded greywackes, siltstones, and shales of turbidite affinity, which are interspersed with the minor volcanics. The
Burrell  Creek  Formation  is  overlain  by  interbedded  greywackes,  mudstones,  tuffs,  minor  conglomerates,  mafic  to
intermediate volcanics and banded ironstone of the Tollis Formation. The Burrell Creek Formation and Tollis Formation
comprise  the  Finniss  River  Group.  The  Finniss  River  Group  strata  have  been  folded  about  northerly  trending  F1  fold
axes.  The  folds  are  closed  to  open  style  and  have  moderate  westerly  dipping  axial  planes  with  some  sections  being
overturned. A later north-south compression event resulted in east-west trending open style upright D2 folds. The Finniss
River Group has been regionally metamorphosed to lower green schist facies. Late and Post Orogenic granite intrusions
of  the  Cullen  Batholith  occurred  from  1,789  Ma  to  1,730  Ma,  and  brought  about  local  contact  metamorphism  to
hornblende hornfels facies.

The Batman pit geology consists of a sequence of hornfelsed interbedded greywackes and shales with minor thin beds of
felsic  tuff.  Bedding  consistently  strikes  at  325  degrees,  dipping  40   degrees  to  60  degrees  to  the  southwest.  Northerly
trending sheeted quartz sulfide veins and joints striking at 0 degrees to 20 degrees and dipping 60  degrees to the east are
the major controls for mineralization in the Batman pit. The veins are 1 to 100 millimeters in thickness with an average
thickness of around 8 to 10 millimeters and occur in sheets with up to 20 veins per horizontal meter. These sheeted veins
are the main source of gold mineralization in the Batman pit. In general, the Batman pit extends 1,600 meters in length by
1,100 meters in width and has been drill tested to a depth of 800 meters down-dip. The deposit is open along strike and
at depth.

The  mineralization  within  the  Batman  pit  is  directly  related  to  the  intensity  of  the  north-south  trending  quartz  sulfide
veining.  The  lithological  units  impact  on  the  orientation  and  intensity  of  mineralization.  Sulfide  minerals  associated  with
the  gold  mineralization  are  pyrite,  pyrrhotite  and  lesser  amounts  of  chalcopyrite,  bismuthinite  and  arsenopyrite.  Galena
and  sphalerite  are  also  present,  but  appear  to  be  post-gold  mineralization,  and  are  related  to  calcite  veining  in  the
bedding plains and the east-west trending faults and joints. Two main styles of mineralization have been identified in the
Batman pit. These are the north-south trending vein mineralization and bedding parallel mineralization. 

Gold  mineralization  in  the  Batman  deposit  occurs  in  sheeted  veins  within  silicified  greywackes/shales/siltstones.  The
Batman  deposit  strikes  north-northeast  and  dips  steeply  to  the  east.  Higher  grade  zones  of  the  deposit  plunge  to  the
south. The core zone is approximately 200-250 meters wide and 1.5 kilometers long, with several hanging wall structures
providing additional width to the orebody. Mineralization is open at depth as well as along strike, although the intensity of
mineralization weakens to the north and south along strike.

Historical Operations

The Batman gold prospect is located in the Pine Creek Geosyncline that was worked from early in the 20th century. Gold
and tin were discovered in the Mt Todd area in 1889. Most deposits were worked in the period from 1902 to 1914. A total
of 7.80 tonnes of tin concentrate was obtained from cassiterite-bearing quartz-kaolin lodes at the Morris and Shamrock
mines. The Jones Brothers reef was the most extensively mined gold-bearing quartz vein, with a recorded production of
28.45 kg Au. This reef consists of a steeply dipping ferruginous quartz lode within tightly folded greywackes.

The  Yinberrie  Wolfram  field,  discovered  in  1913,  is  located  5  kilometers  west  of  Mt  Todd.  Tungsten,  molybdenum  and
bismuth  mineralization  was  discovered  in  greisenized  aplite  dykes  and  quartz  veins  in  a  small  stock  of  the  Cullen
Batholith.  Recorded  production  from  numerous  shallow  shafts  is  163  tonnes  of  tungsten,  130  kg  of  molybdenite  and  a
small quantity of bismuth.

Exploration  for  uranium  began  in  the  1950s.  Small  uranium  prospects  were  discovered  in  sheared  or  greisenized
portions of the Cullen Batholith in the vicinity of the Edith River.

32

Table of Contents

Australian Ores and Minerals Limited (“AOM”) in a joint venture with Wandaroo Mining Corporation and Esso Standard
Oil took out a number of mining leases in the Mt Todd area during 1975. Initial exploration consisted of stream sediment
sampling,  rock  chip  sampling,  and  geological  reconnaissance  for  a  variety  of  commodities.  A  number  of  geochemical
anomalies  were  found  primarily  in  the  vicinity  of  old  workings.  Follow-up  work  concentrated  on  alluvial  tin  and,  later,
auriferous  reefs.  Backhoe  trenching,  costeaning,  and  ground  follow-up  were  the  favored  mode  of  exploration.  Two
diamond  drillholes  were  drilled  at  Quigleys.  Despite  determining  that  the  gold  potential  of  the  reefs  in  the  area  was
promising, AOM ceased work around Mt Todd.

The Arafura Mining Corporation, CRA Exploration, and Marriaz Pty Ltd all explored the Mt Todd area at different times
between 1975 and 1983. In late 1981, CRA Exploration conducted grid surveys, geological mapping and a 14 diamond
drillhole program, with an aggregate meterage of 676.5 m, to test the gold content of Quigleys Reef over a strike length of
800 meters. Following this program CRA Exploration did not proceed with further exploration.

During late 1986, Pacific Gold Mines NL (“Pacific”) undertook exploration in the area which resulted in small-scale open
cut mining on the Quigleys and Golf reefs, and limited test mining at the Alpha, Bravo, Charlie and Delta pits. Ore was
transported to a CIP plant owned by Pacific at Moline. This continued until December 1987. Pacific ceased operations in
the area in February 1988 having produced approximately 86,000 tonnes grading 4 g Au/t (historical reported production,
not  S-K  1300  or  NI  43-101  compliant).  Subsequent  negotiations  between  the  joint  venture  partners  Shell  Company  of
Australia (“Billiton”), Zapopan NL (“Zapopan”) and Pacific resulted in the acquisition of this ground and incorporation into
the joint venture.

Billiton, who was the managing  partner  in  an  exploration  program  in  the  joint  venture  with  Zapopan,  discovered  the  Mt
Todd mineralization, or more specifically the Batman deposit, in May 1988. In 1992, Pegasus acquired a shareholding in
Zapopan, following which Zapopan acquired Billiton’s interest. Pegasus progressively increased their shareholding until
they acquired full ownership of Zapopan in July 1995.

Historical preliminary studies (not S-K 1300 or NI 43-101 compliant) for Phase I, a heap leach operation which focused
predominately on the oxide portion of the deposit, commenced during 1992 culminating in an engineering, procurement,
construction management (“EPCM”) award to Minproc in November of that year. The Phase I project was predicated upon
a  4  million  tonne  per  year  (“Mtpy”)  heap  leach  plant,  which  came  on  stream  in  late  1993.  The  treatment  rate  was
subsequently expanded to a rate of 6 Mtpy in late 1994.

Based  on  our  review  of  the  historical  project  files,  we  believe  that  approximately  21.4  million  tonnes  grading  1.05
grams gold per tonne and containing 723,795 ounces of gold were extracted between 1993 and the termination of mining
in 2000. Processing was by a combination of heap leach production from oxide ore and cyanidation of sulfide ore. The
remaining  mineralization  consists  of  sulfide  mineralization  lying  below  and  along  strike  of  the  existing  open  pit,  and  in
hanging wall structures parallel to the main zone in the existing open pit.

Historical heap leach production is shown in the table below:

33

Table of Contents

Category

Historical Heap
Leach Production
Reported

Tonnes Leached (million)

Head Grade (g Au/t)

Recovery (%)

13.2

0.96

53.8

Gold Recovered (oz)

220,755

Cost/t (AUD)

Cost/oz (AUD)

8.33

500

NOTE:  All  tonnages  and  grades  are  historical  production
numbers  that  pre-date  Vista’s  ownership.  The  QPs  and
issuer  consider  historical  estimates  to  be  relevant  but  not
current.

Phase II involved expanding to 8 Mtpy and treatment through a flotation and carbon-in-leach circuit. The feasibility study
was conducted by a joint venture between Bateman Kinhill and Kilborne (“BKK”) and was completed in June 1995.

The Pegasus board approved the project on August 17, 1995, and awarded an EPCM contract to BKK in October 1995.
Commissioning  commenced  in  November  1996.  Final  capital  costs  to  complete  the  project  were  AUD232  million
(USD181 million).

Design capacity was never achieved due to inadequacies in the 3 rd and 4th stages of the crushing circuit. A throughput
rate  of  just  under  7  Mtpy  was  achieved  by  mid-1997;  however,  problems  with  the  flotation  circuit  which  resulted  in
reduced recoveries necessitated closure of this circuit. Subsequently, high reagent consumption, as a result of cyanide
soluble copper minerals, further hindered efforts to reach design production. Operating costs were above those predicted
in the feasibility study. The spot price of gold deteriorated from above USD400 in early 1996 to below USD300 per ounce
at the end of 1997. This, combined with underperformance of the project and higher operating costs led to the mine being
closed and placed on care and maintenance on November 14, 1997.

In  February  1999,  General  Gold  Resources  Pty.  Ltd.  (“General  Gold”)  agreed  to  form  a  joint  venture  with  Multiplex
Resources Pty Ltd (“Multiplex”) and Pegasus to own, operate, and explore the mine. Initial equity participation in the joint
venture  was  General  Gold  2%,  Multiplex  93%,  and  Pegasus  5%.  The  joint  venture  appointed  General  Gold  as  mine
operator, which contributed the operating plan in exchange for a 50% share of the net cash flow generated by the project,
after  allowing  for  acquisition  costs  and  environmental  sinking  fund  contributions.  General  Gold  operated  the  mine  from
March  1999  to  July  2000.  Operations  ceased  in  July  2000,  and  Pegasus,  through  the  Deed  Administrators,  regained
possession of various parts of the mine assets in order to recoup the balance of purchase price owed to it. Most of the
equipment was sold in June 2001 and removed from the mine.

In  March  2006,  Vista  acquired  the  concession  rights  from  the  Deed  Administrators  and  surface  rights  from  the  Jawoyn
and entered into a contract with the NT Government.

Exploration Licenses

Since  acquiring  the  Mt  Todd  ELs,  Vista  has  conducted  an  ongoing  exploration  program  that  includes  prospecting,
geologic mapping, rock and soil sampling, geophysical surveys and exploration drilling. Equipment and personnel were
mobilized  from  the  site  or  from  an  exploration  base  camp  established  in  the  central  part  of  the  ELs.  The  work  was
conducted by geologists and field technicians.

The  exploration  effort  initially  focused  on  follow-up  work  on  targets  developed  by  Pegasus  during  their  tenure  on  the
property. These included the RKD target, Tablelands, and Silver Spray. During a review of Pegasus’ airborne geophysical
survey data, five distinct magnetic highs were observed located within sedimentary rocks that should have a low magnetic

34

Table of Contents

signature. These features are similar to those at Batman, which, as a result of the included pyrrhotite, exhibits a strong
magnetic high. The geophysical targets were prioritized following review of historical work in the area and site visits. To
date,  two  of  the  geophysical  targets,  Golden  Eye  and  Snowdrop,  have  been  drilled  and  a  third,  Black  Hill,  has  been
covered by soil sampling.

The  Wandie  target  has  a  different  magnetic  signature.  Field  examination  identified  small  scale  pits  on  an  iron-rich
outcropping.

There  are  no  reportable  mineral  resources  and  mineral  reserves  on  the  ELs.  No  data  from  the  ELs  were  used  in  the
development of the 2022 FS results.

Exploration Sampling summary:

Year

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

Soils

0

1,333

3,135

1,925

2,312

572

2,601

841

241

1,098

341

313

278

0

Rock Chips

164

45

224

79

295

51

143

53

27

78

132

170

9

11

Exploration Potential for MLs

Total Samples

14,990

1,481

Based  on  airborne  geophysical  survey  data,  we  have  identified  several  magnetic  targets  within  our  controlled  land
holdings surrounding the Batman pit. The targets are distinct magnetic highs located within sedimentary rocks that should
have  a  low  magnetic  signature.  These  features  are  similar  to  those  at  Batman,  which,  as  a  result  of  the  included
pyrrhotite, exhibits a strong magnetic high.

Mineralization  at  the  Quigleys  deposit  is  interpreted  to  occur  within  a  series  of  mineralized  shears  that  strike  north
northwest and dip 30 to 35 degrees to the west. The main shear extends for nearly one kilometer along the strike and has
been drilled to a vertical depth of 230 meters. The mineral resource estimate has been defined by 632 drill holes drilled by
Pegasus and Billiton Australia Gold Pty. Ltd. in the late 1980s through the mid-1990s. Tetra Tech reviewed the integrity
of the drill-hole database and developed a computer model to estimate and classify the estimated mineral resources. The
model  reflected  Tetra  Tech’s  geological  interpretation  of  the  deposit,  which  constrained  the  mineralization  to  the  shear
zones  using  geological  information  and  assays  from  49,178  samples  obtained  from  the  drilling.  Lower  grade,  erratic
mineralization in the hanging wall of the shears has not been included in the mineral resource estimate.

Sampling  and  assaying  were  performed  under  the  supervision  of  prior  operators  in  conjunction  with  evaluation  of  the
Batman pit and are discussed in the 2022 FS, as part of the overall Project sampling and assaying methodology.

35

Table of Contents

Drilling

Batman Deposit

The Batman deposit resource drillhole database consists of both pre-Vista and Vista drill holes. All of the Vista resource
drill holes are HQ-size core holes. Vista has drilled a total of 92 HQ diamond drill holes totaling 58,863 meters. All of the
Vista diamond drill core samples were sawn into half splits for assaying purposes.

The pre-2007 exploration database (pre-Vista) consists of 743 drill holes, of which 226 are diamond drill holes and 517
are percussion drill holes. These drill holes total approximately 98,000 meters. The diamond core was a combination of
NQ and HQ sizes, with the NQ core being sawed into half splits and the HQ core being sawed into quarter splits.

The  table  below  shows  a  summary  of  Batman  Deposit  drilling  from  1988  to  2017.  A  large  percentage  of  the  historical
drilling was by reverse circulation (“RC”) of less than 100 meters in depth. The RC drilling was used for ore grade control
during  the  mining  operations  of  Pegasus  and  General  Gold  Resources.  Vista’s  drilling  discovered  a  larger  Batman
Deposit resource by probing deeper with diamond drilling averaging 550 meters in depth.

Batman Deposit Drilling History

Date

1988

1989

1990

1991

1992

1993

Reference

Truelove

Kenny, Wegmann, Fuccenecco

Wegmann, Fuccenecco, Gibbs

Billiton

Zapopan

Zapopan

1994-1997

Pegasus Gold

1998-2000

General Gold Resources

2007

2008

2010

2011

2012

2015

2016-2017

Vista

Vista

Vista

Vista

Vista

Vista

Vista

Holes (#)

Percussion
(m)

Diamond
(m)

17

133

122

149

18

16

170

105

25

16

12

7

27

5

4

1,475

6,263

—

501

—

—

—

—

—

—

—

—

—

—

—

—

8,562

5,060

202

1,375

—

—

7,436

9,883

8,938

6,864

4,480

17,439

3,185

1,635

RC
(m)

—

3,065

8,072

3,090

1,320

2,814

22,534

26,365

—

—

—

—

—

—

—

1988-2017

Batman Total

826

8,239

75,059

67,260

Vista Drilling 2012 – 2017

Between the fourth quarter of 2012 and the end of the first quarter of 2017, the Vista exploration program at the Batman
Deposit consisted of 22 diamond core drillholes containing 12,530 m that targeted both infill definitional drilling and step-
out drilling.

The majority of drilling was angled so as to be approximately perpendicular to the mineralized core. This orientation more
accurately transects the true thickness of the mineralization. The Batman Deposit mineralization forms a set of stacked
plates that strike to the north and plunge steeply to the east. These mineralized zones have been defined by wireframes

36

Table of Contents

which are used to constrain the higher grades for resource estimation. Early drilling sampled the deposit near the surface
allowing for shorter drillhole depths. Exploring the deeper portions of the deposit has required drill collars to be offset to
the  east  with  longer  drillhole  lengths  to  reach  the  mineralized  zone.  Recent  Vista  drilling  in  particular  has  targeted  the
deeper portions of the Batman Deposit. The positioning of the Vista drillhole collars were constrained to be outside of the
flooded historical mine pit. Most Vista drilling has been oriented so as to transect the higher-grade mineralized zone

While there are random high-grade intercepts outside of the core, the majority of higher-grade mineralization resides in
the core zone of the deposit.

Quigleys

The table below shows the Quigleys Deposit drilling history. The Quigleys Deposit was mined from 1982 to 1987 during
which the largest amount of drilling was percussion type used for ore grade control.

Relevant  intervals  of  mineralization  are  contained  within  blanket-like  zones  which  are  modeled  with  3-D  wireframes  for
resource  estimation.  The  mineralized  zones  have  been  defined  by  wireframes  which  are  used  to  constrain  the  higher
grades  for  the  resource  estimation.  The  majority  of  drilling  was  angled  so  as  to  be  approximately  perpendicular  to  the
mineralized  core.  This  orientation  more  accurately  transects  the  true  thickness  of  the  mineralization.  While  there  are
random high-grade intercepts outside of the core, the majority of higher-grade mineralization resides within the defined
zones. In 2011, Vista explored the potential for a deeper deposit with three diamond drillholes, each over 350 meters in
depth.

Quigleys Deposit Drilling History

Reference

Holes (#)

Percussion (m)

Diamond
(m)

200

676.5

9710

202

1,090

RC (m)

—

—

4,013

—

—

41,930

11,878

4,013

2

14

603

9

3

631

—

—

41,429

501

—

Date

1975

1981

Australian Ores and Minerals/Esso

Arafura Mining Corp / CRA

1982-1987

Pacific Gold Mines NL (Small Scale Mining)

1989

2011

Pacific Gold Mines

Vista

1988-2017 Quigleys Total

Drilling Results

The  results  of  drilling  at  the  Batman  Deposit  and  Quigleys  Deposit  were  used  to  determine  the  gold  mineral  resource
estimates for the Batman and Quigleys Deposit. Vista’s drilling discovered a larger Batman resource by probing deeper
with diamond drilling averaging 550 meters in depth. While there are random high-grade intercepts outside of the core,
the  majority  of  higher-grade  mineralization  at  Batman  resides  in  the  core  zone  of  the  deposit.  Relevant  intervals  of
mineralization  at  Quigleys  Deposit  are  contained  within  blanket-like  zones  which  are  modeled  with  3-D  wireframes  for
resource estimation. While there are random high-grade intercepts outside of the core zone, the majority of higher-grade
mineralization at the Quigleys Deposit resides within the defined zones.

2020-2021 Drilling Program Results

Vista  continued  the  “proof  of  geologic  concept”  exploration  drilling  started  in  2020.  In  2021,  a  total  of  13  additional
exploration drill holes were drilled on the MLs. The results of these drill holes continue to confirm the Vista interpretation
of  the  mineralization  and  geologic  structures  between  the  Batman  and  Quigleys  deposits  along  ta  5.4  Km  trend.  This
drilling is widely spaced and not sufficient to develop any geologic resource estimates.

37

Table of Contents

Drill Hole
ID

Northing
m
(MGA94
z53)

Easting m
(MGA94
z53)

VB20-001

187603.0

8435654.0

VB20-002
VB20-003

187287.0
187272.0

8435936.0
8435933.0

VB20-004

187251.0

8435933.0

VB20-005

187263.0

8435898.0

VB21-001

187290.0

8345899.0

VB21-002

187662.0

8436402.0

VB21-003
VB21-004

187322.0
187942.0

8435849
8436407.0

VB21-005

187586.0

8436404.0

VB21-006

187629.0

8435852.0

VB21-007

187618.0

8436518.0

VB21-008
VB21-009

187758.0
188222.0

8436406.0
8436800.0

VB21-010

188071.0

8436413.0

VB21-011

187728.0

8436500.0

VB21-012

188435.0

8436405.0

VB21-013

187423.0

8436409.0

Sampling, Analysis and Data Verification

Elevation
(masl)

Bearing
(°)

Dip
(°)

148.0

143.0
140.0

144.0

151.0

152.0

164.0

158.8
148.0

154.0

132.0

148.0

137.0
143.0

153.0

148.0

155.0

169.0

270.0

270.0
266.0

269.9

269.9

269.9

275.0

271.9
 87.9

270.0

92.9

272.9

276.0
89.9

86.0

265.0

260.9

86.4

-58.0

-58.0
-54.0

-50.0

-61.0

-61.0

-40.0

-62.0
 -50.0

-50.0

-50.0

-50.0

-48.0
-50.0

-50.0

-50.0

-50.0

-53.0

Total
Depth
(m)

362.8

280.0
299.8

148.0

197.9

234.5

458.6

285.7
410.8 

445.7

347.7

299.9

477.3
437.5

417.4

398.8

901.2 

311.9

Drillhole
Type

Diamond

Diamond
Diamond

Diamond

Diamond

Diamond

Diamond

Diamond
Diamond

Diamond

Diamond

Diamond

Diamond
Diamond

Diamond

Diamond

Diamond

Diamond

The sampling method and approach for drillholes completed between 2012 and 2018 was the same as has been used by
Vista for all of the Vista diamond drilling. The drill core, upon removal from the core barrel, was placed into plastic core
boxes.  The  plastic  core  boxes  were  transported  to  the  sample  preparation  building  where  the  core  was  marked,
geologically logged, geotechnically logged, photographed, and cut into halves. One-half was placed into sample bags as
nominal one-meter sample lengths, and the other half retained for future reference. The only exception to this was when
a portion of the remaining core had been flagged for use in the ongoing metallurgical test work.

The bagged samples had sample tags placed both inside and on the outside of the sample bags. The individual samples
were grouped into “lots” for submission to Northern Analytical Laboratories for sample preparation and analytical testing.
All of this work was done under the supervision of a Vista geologist.

The  following  section  describes  the  sample  preparation,  analyses  and  security  undertaken  by  Vista  through  the
December 31, 2021 resource update.

The diamond drilling program was conducted under the supervision of the geologic staff composed of a chief geologist,
several experienced geologists, and a core handling/cutting crew. The core handling crew was recruited locally.

Facilities  for  the  core  processing  included  an  enclosed  core  logging  shed  and  a  covered  cutting  and  storage  area  that
was fenced in. Both of these facilities were considered to be limited access areas and kept secured when work was not in
progress.

The diamond drill core was boxed and stacked at the rig by the drill crews. Core was then picked up daily by members of
the core handling crew and transported directly to the core logging shed. Processing of the core included photographing,
geotechnical and geologic logging, and marking the core for sampling. The nominal sample interval was one meter. When
this process was completed, the core was moved into the core cutting/storage area where it was laid out for cutting and
sampling. The core was logged using the following procedures:

38

Table of Contents

● One-meter depth intervals were marked out on the core by a member of the geologic staff;
● Core orientation (bottom of core) was marked with a solid line when at least three orientation marks aligned and
were used for structural measurements. When orientation marks were insufficient an estimated orientation was
indicated by a dashed line;

● Geologic logging was then done by a member of the geologic staff. Assay intervals were selected at that time and
a cut line marked on the core. The standard sample interval was one meter, with a minimum of 0.4 meters and a
maximum of 1.4 meters;

● Blind  sample  numbers  were  then  assigned  based  on  pre-labeled  sample  bags.  Sample  intervals  were  then

indicated in the core tray at the appropriate locations; and

● Each  core  tray  was  photographed  and  restacked  on  pallets  pending  sample  cutting  and  stored  on  site

indefinitely.

The  core  was  then  cut  using  diamond  saws  with  each  interval  placed  in  sample  bags.  At  this  time,  the  standards  and
blanks were also placed in plastic bags for inclusion in the shipment. A reference standard or a blank was inserted at a
minimum ratio of 1 in 10 and at suspected high-grade intervals additional blanks sample were added. Standard reference
material was sourced from Ore Research & Exploration Pty Ltd and provided in 60 g sealed packets. When a sequence
of five samples was completed, they were placed in a shipping bag and closed with a zip tie. All of these samples were
kept in the secure area until crated for shipping.

Samples were placed in crates for shipping with 100 samples per crate (20 shipping bags) and sealed. The sealed crates
were stacked outside the core logging shed until picked up for transport.

The following laboratories have been used for sample preparation, analyses, and check assays:

Laboratory

ALS | Minerals

ALS | Minerals

Address

31 Denninup Way
Malaga, WA 6090

Purpose

Main assay
analyses

ALS

Abbreviation

Certifications

13 Price St
Alice Springs, NT 0870

Sample
Preparation

ALS
Alice Springs

ISO:9001:2008
and ISO 17025
Certified

ISO 9001:2008
and ISO 17025
Certified

Genalysis Laboratory
Services (Intertek Group)

15 Davison St
Maddington, WA 6109

Check Analyses Genalysis

Unable to verify

North Australian
Laboratories Pty Ltd
(“NAL”)

NT Environmental
Laboratories (Intertek
Group)

MLN 792 Eleanor Rd
Pine Creek, NT 0847

Alternative
assay analyses

NAL

ISO 17025
Certified

3407 Export Dr
Berrimah, NT 0828

Check Analyses NTEL

ISO 17025

Vista is completely independent of each of the above listed analytical testing entities, other than the engagement of said
entities as a service provider.

Each of the laboratories listed follow their own quality controls based on international standards. For example, ALS uses
accredited methods specified by ISO/IEC 17025 in North America and Australia. The standards specify a recipe and set
of  quality  control  steps  that  the  laboratory  should  follow  including  how  the  sample  should  be  coded  to  obscure  its
relationship to the drilling geometry; how the received sample should be prepared; what analytical steps need be taken,
given  the  required  detection  level  and  material  analyzed,  what  instruments  should  be  employed,  what  internal  quality
controls  should  be  done  such  as:  periodic  assaying  of  duplicate  samples,  the  insertion  of  certified  calibration  samples;
utilizing blanks; and including a required number of randomized samples.

39

Table of Contents

Mt Todd as a gold project requires assays to be done with the  industry  standard  of  fire  assay.  To  get  these  fire  assay
results  core  samples  from  drillholes  are  split  at  Mt  Todd  into  two  with  one  archived  and  the  other  sent  to  an  analytical
laboratory. At the lab the sample is pulverized into a powder, with a subsample taken for fire assay. This subsample is
then mixed with a fluxing agent. The remaining pulverized material is called a pulp archive, which can be used for within
and between laboratory validations. The chosen sample is then heated in a furnace where it fuses and separates into a
“button”  which  contains  the  gold.  There  are  several  methods  to  extract  the  gold  from  the  button.  The  most  common
method is by combining the button with lead as a collector. The lead oxidizes and is absorbed into a cupel leaving a gold
bead. Due to the relatively low concentration of gold at Mt Todd the lab must choose an analytical method able to detect a
least 5ppb gold. The methods are generally by atomic absorption (AA) or inductively coupled plasma-mass spectrometry
(ICP-MS).  The  bead  is  dissolved  in  aqua  regia  or  dissolved  in  hydrochloric  acid  and  then  analyzed  by  the  selected
instrument. The resultant assay values are reported by an assay certificate which is electronically or physically sent to the
staff at Mt Todd. The assay results are entered with the drilling database.

Vista  requires  periodic  rechecking  of  assays  both  within  and  between  laboratories.  As  an  example,  prior  to  the  2011
drilling campaign, the majority of samples were transported first to ALS in Alice Springs (NT) for sample preparation. After
preparation, samples were then forwarded on to ALS in Malaga (WA) for assay analyses. One in every 20 pulp or reject
was  sent  from  ALS  in  Alice  Springs  to  Northern  Australian  Laboratories  (“NAL”),  Vista  was  notified  by  email  which
samples were sent to NAL. For the 2011-2012 drilling campaign samples for assay were sent to NAL lab in Pine Creek,
NT. Following completion of assay results, all pulps and reject material was shipped back to the Mt Todd site and stored.

A comprehensive check of the quality of 12,365 assays in the database was undertaken by an outside auditor. Records
were selected from among those that relate to mineralization that is still in situ. These were divided into three subsets, to
be  checked  by  three  individual  checkers.  An  additional  1,812  records  were  spot-checked  in  greater  detail  by  a  fourth
individual. After the checking was done, from the original 12,365 records, 95% were selected that had gold value in the
database and a gold assay in a source document such as an assay certificate. Of the assay pairs, 8,549 were “historical”
in  the  sense  of  dating  prior  to  Vista’s  acquisition  of  the  project  and  3,262  assay  pairs  originate  with  Vista’s  work.  For
context, Mt Todd assay table  as  of  August  of  2011  contained  118,550  records,  26,579  of  them  originating  from  Vista’s
work.

Eight  significant  outliers  were  found  with  gold  values  in  the  database  that  differed  from  the  source  documents.  Those
eight were double-checked and were found to be real cases of the database containing data that differ from the source
documents.  The  below  table  shows  that  most  of  the  differences  between  the  gold  values  in  the  database  and  those
gleaned  from  the  source  documents  are  very  small,  although  around  economic  cutoff  grades  the  differences  may  well
represent  large  percentages.  More  than  99%  of  the  differences  fall  in  the  range  -0.1  ppm  Au  to  +0.1  ppm  Au  which  is
below  the  0.4  ppm  cutoff  grade.  However,  a  Mann-Whitney  Test  suggests  that  the  differences  between  the  two
populations are not statistically different.

Prior to the 2011 drilling campaign, the majority of samples were transported first to ALS in Alice Springs, NT for sample
preparation. After preparation, samples were then forwarded on to ALS in Malaga, Western Australia for assay analyses.
One in every 20 pulp or reject was sent from ALS in Alice Springs to Northern Australian Laboratories (NAL), Vista was
notified by email which samples were sent to NAL. For the 2011-2012 drilling campaign samples for assay were sent to
NAL  lab  in  Pine  Creek,  NT.  Check  assays  on  one  in  every  20  pulps  or  rejects  were  completed  by  NT  Environmental
Laboratories. Following completion of assay results, all pulps and reject material was shipped back to the Project site and
stored.

Comparison of Assay Values between the Database and Source Documents

Center of Cell Range in ppm

Au

(+/-  0.1 ppm Au)

-1.2

-1

-0.8

Frequency

Percent

Cumulative

0

0

1

0.00

0.00

0.01

Percent

0.00

0.00

0.01

40

Table of Contents

Center of Cell Range in ppm

Au

(+/-  0.1 ppm Au)

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

1.2

Frequency

Percent

Cumulative

0

0

3

8,539

5

0

0

0

0

1

0.00

0.00

0.04

99.88

0.06

0.00

0.00

0.00

0.00

0.01

Percent

0.01

0.01

0.05

99.93

0.99

99.99

99.99

99.99

99.99

100.00

Differences with no rounding or truncation of data

The  tables  show  the  comparison  of  the  gold  grade  assays  within  the  database  and  source  documents.  One  of  the
three data sets checked contained 3,262 assays from drilling campaigns by Vista in 2007 and 2008. Checks of the
Vista data against original sources were done by one individual, using essentially the same procedures as had been
used for checking the historical  assays.  A  summary  table  of  the  findings  is  presented  below.  Of  the  12  differences
noted, two are significant. A gold value of 0.005 ppm Au in the database compared to the correct gold value of 0.8
ppm Au. A gold value of 1.08 ppm Au in the database compared to the correct gold value of 0.01 ppm Au. In addition,
a separate detailed audit was done on 638 assays on Vista drillhole VB08-036. This audit shows that discrepancies
within the database on the global resource estimate are not material.

Summary of Comparisons of Historical Assays

Au in PPM

Historical Assays

Database

Source

Average

Std Dev

Count

Max

Min

Median

Differences > 0.01 ppm Au

Differences < 0.01 ppm Au

0.70

1.48

1171

33.45

0.005

0.3

0.79

1.48

1171

33.44

0.005

0.3

41

Differences,
Source -
Database in
PPM

0

0.01

565

0.255

-0.29

0

20

4

 
 
 
 
Table of Contents

Summary of Comparisons of Vista Assays

Au in PPM

Vista Assays

Database

Source

Differences,
Source -
Database in PPM

Average

Std Dev

Count

Max

Min

Median

Differences > 0.01 ppm Au

Differences < 0.01 ppm Au

0.79

1.89

3262

55.37

0.005

0.26

0.78

1.89

3262

55.37

0.005

0.26

0

0.02

12

0.79

-1.07

0

3

6

The Company requires periodic rechecking of assays both within and between laboratories. As an example, prior to the
2011  drilling  campaign,  the  majority  of  samples  were  transported  first  to  ALS  in  Alice  Springs  (NT)  for  sample
preparation. After preparation, samples were then forwarded on to ALS in Malaga (WA) for assay analyses. One in every
20 pulps or rejects was sent from ALS in Alice Springs to Northern Australian Laboratories (NAL), Vista was notified by
email which samples were sent to NAL. For the 2011-2012 drilling campaign samples for assay were sent to NAL lab in
Pine  Creek,  NT.  No  bias  in  assays  was  found  with  a  slope  of  0.992  and  a  correlation  of  99%.  There  was  only  one
significant  difference  that  was  detected  from  a  total  of  2,948  comparisons.  The  Company’s  assaying  protocols  are
observed and required for every assay program, regardless of whether the exploration work is for resource estimation or
metallurgical testing.

John  W.  Rozelle,  Senior  Vice  President  of  Vista  and  a  qualified  person  as  defined  by  S-K  1300  and  NI  43-101,  has
verified  the  data  disclosed  in  this  document,  including  sampling,  analytical  and  test  data  underlying  the  information
contained in the disclosure.

Sample Security

NAL is the primary laboratory we use for analysis of drill core assays. The NAL laboratory is located in the town of Pine
Creek,  approximately  50  kilometers  distant  by  road  from  the  Project  site.  Samples  were  picked  up  and  transported  by
NAL employees.

Sample shipments were scheduled for approximately once a week. The sealed crates were picked up on site by NAL for
direct road transport to the assay lab. A sample transmittal form was prepared and included with each shipment and a
copy was filed in the geology office on site.

When the shipment left site, sample transmittals were prepared and e-mailed to NAL. When the shipment arrived at the
preparation facility the samples were lined out and a confirmation of sample receipt was e-mailed back to Vista.

Statistical analyses of the various drilling populations and quality assurance/quality control (QA/QC) samples have neither
identified nor highlighted any reasons to not accept the data as representative of the tenor and grade of the mineralization
estimated at the Batman deposit.

Mining Operations

The  Project  is  designed  to  be  a  large  open-pit  mining  operation  that  will  utilize  large-scale  mining  equipment  in  a
drill/blast/load/haul  operation.  Ore  is  planned  to  be  processed  in  a  comminution  circuit  consisting  of  large-scale
equipment, including: a gyratory crusher, cone crushers, high pressure grinding roll (“HPGR”) crushers followed by X-ray

42

 
 
 
 
Table of Contents

transmission (“XRT”) and laser sorting, and primary ball mills, followed by VXP Mills, as discussed in greater detail below.
Vista plans to recover gold in a conventional carbon-in-pulp (“CIP”) recovery circuit.

Mineral Processing

The flowsheet consists of open-circuit primary crushing, closed-circuit secondary crushing, closed-circuit tertiary crushing
using HPGR crushers, ore sorting, two-stage grinding, cyclone classification, pre-leach thickening, leach and adsorption,
elution  electrowinning  and  smelting,  carbon  regeneration,  tailings  detoxification  and  disposal  to  conventional  tailings
storage facility (“TSF”). The flowsheet for the Project is illustrated below.

Metallurgical Testing

Our metallurgical test work programs have confirmed: (1) ore hardness of the Batman deposit is consistent throughout the
deposit and does not change at depth; (2) the selection of HPGR crusher technology as part of the comminution circuit;
(3)  the  selection  of  ore  sorting  technology  to  eliminate  low-grade  material  after  crushing  and  prior  to  grinding;  (4)
estimated gold recovery rates based on optimized grind size and leach conditions; and (5) the processing of material from
the historical heap leach pad at the end of the proposed mine life.

The test work results collated from the 2011 and 2012 testing campaigns and additional metallurgical and process test
work  conducted  in  2016,  2017,  2018,  and  2019,  together  with  the  process  design  criteria,  were  used  to  develop  the
process flow sheet and mass balance.

Ore Hardness

Bond ball mill work indices (“BWi”) were determined at a grind size of P80 of 100 mesh for the various products, namely
HPGR crusher, ore-sorting, composite samples and waste material.

43

Table of Contents

The test results indicate the following:

●

●

●

The BWi for the ore sorter feed (plus 5/8” screened HPGR crusher product) was higher than the composite
samples prepared from the minus 5/8” screened HPGR crusher product. Hence, it is reasonable to conclude
that the uncrushed material from the HPGR is harder than the crushed product.

The rejected waste material had a BWi higher than both the composite sample prepared from the minus 5/8”
HPGR crusher product and the XRT ore sorting product that is returned to the HPGR crushers.

The BWi for the final HPGR product ranged from 23.10 to 26.63. A BWi of 24.50 was selected for the design
of the primary ball mill circuit.

The results of this test work support two main conclusions: (1) that the hardness of ore at the Batman deposit is relatively
constant; and (2) that ore hardness at the Batman deposit does not change at depth.

This test work validates the Company’s prior test work and supports Vista’s revised comminution circuit design, which is
designed to crush and grind material with an average BWi of 26.2 kWh/t.

HPGR Crusher Selection

The proposed 50,000 tpd Project comminution circuit incorporates the use of a gyratory crusher and two cone crushers
for the primary and secondary stages, respectively, and the use of two HPGR crushers as the third-stage of the crushing
circuit.

The test work assessed the difference in power requirements between a primary/SAG/ball mill circuit, a conventional 3-
stage  crush/ball  mill  circuit,  and  a  3-stage  HPGR  crush/ball  mill  circuit  (with  3rd  stage  HPGR  crushing  and  2-stage
grinding) to generate a P80 passing 40 μm product.

This test work also confirms our prior test work and supports our comminution circuit design. The use of HPGR crushers
is  anticipated  to  (a)  produce  a  product  that  can  be  ground  more  efficiently  (lower  BWi);  and  (b)  reduce  energy
requirements when compared to a SAG Mill design.

Ore Sorting

The bulk ore sorting tests comprised four, five-tonne composites; and one, one-tonne composite prepared from 3.75" drill
core.  In  addition  to  these  composites,  three  one-tonne  composites  were  made  from  2.75”  drill  core.  Four  of  the  3.75”
composites contained predominately sulfide mineralization and one composite contained mixed oxide/sulfide material that
is  encountered  on  the  periphery  of  the  deposit.  The  remaining  three  2.75”  drill  core  composites  all  contained  sulfide
material. The drill core was HPGR crushed and screened at plus 5/8” at the facilities of Thyssen Krupp Industries near
Dusseldorf,  Germany.  The  plus  5/8”  material  was  sent  to  the  test  facility  of  Tomra  Sorting  Solutions  near  Hamburg,
Germany where this material was initially sorted using XRT sorting. A total of 12 sorting tests were completed. The XRT
rejects  were  then  subjected  to  laser  sorting  to  produce  a  final  reject.  All  material  (minus  5/8”  HPGR  crushed,  XRT
product, laser product and sorting reject) was sent to the metallurgical laboratory of Resource Development Inc. in Wheat
Ridge, Colorado for subsequent sample preparation, assaying and additional metallurgical testing.

On  a  material  mass  basis,  the  combined  XRT  and  laser  sorting  tests  confirmed  the  Company’s  expectation  that  it  can
reject approximately 10% of the run-of-mine feed as waste (test results range from 6.8% to 11.0%). The average grade of
the rejected material is estimated to be 0.12 g Au/t (results range from 0.06 g Au/t to 0.23 g Au/t) compared to the mine
cut-off grade of 0.35 g Au/t, resulting in a gold loss from the rejected waste of approximately 1.3%. The improvement in
mill  feed  grade  is  expected  to  be  approximately  8%,  resulting  in  run-of-mine  average  mill  feed  grade  of  0.84  g  Au/t
compared to the life-of-mine Batman Pit mineral reserve grade of 0.79 g Au/t.

44

Table of Contents

Gold Recoveries

We continued evaluating gold recoveries using two-stage grinding and a finer product size. This test work has confirmed
that the introduction of ore sorting to reduce the leach tonnage by approximately 10% and finer grinding to P80 of 40 µm
yields an increase in recovery to ~91.6% on a weighted-average basis, net of solution losses.

A  total  of  71  additional  leach  tests  were  completed  using  the  above  mentioned  two-staged  grinding  to  confirm  our
resulting leach recoveries of 91.9%, net of solution losses. This test work has also confirmed a cyanide consumption rate
of 0.88 kg per tonne.

Our recovery plant design utilizing a conventional, industry-proven, CIP circuit remains unchanged.

Existing Heap Leach Pad

In  addition  to  analysis  of  freshly-mined  material  from  the  Batman  deposit,  Vista  has  analyzed  the  potential  to  process
nearly 13.4 million tonnes of material from the existing heap leach pad at Mt Todd. The historical Mt Todd mine started as
a heap leach operation with historical records indicating that the average grade of material placed on the pad was 0.96 g
Au/t.  Although  the  material  was  partially  leached  in  the  mid-1990s,  Vista  has  drilled  24  air-rotary  holes  into  the  heap
leach pad and assayed 361 samples, and Tetra Tech created a 3D resource model that has an average grade of 0.54 g
Au/t.

Initial evaluation efforts focused on re-starting the heap leach pad. Bottle roll and column tests were completed, both of
which supported the leachability of the material with gold recovery rates around 35%. However, poor  in situ permeability
rates caused Vista to ultimately abandon plans to re-start the heap.

A  total  of  16  tests  were  completed  on  composites  taken  from  11  of  the  heap  leach  pad  drill  holes.  The  samples  were
ground to the size of P80 of 40 μm and pre-treated with lime and 100 g/t of lead nitrate to suppress copper leaching. The
material was then leached for 24 hours. These results ranged between 71 and 91% with the average being 82.2% for this
material when processed through the proposed CIP flowsheet.

The 2022 FS assumes that the existing heap leach pad will be left in place and processed through the mill at the end of
mine  life.  This  ultimately  is  expected  to  reduce  the  scope  of  reclamation  of  the  heap  leach  pad  to  the  pad  liner  and
regrading only.

Permitting

During September 2014, the EIS was approved. In its Assessment Report, the NTEPA advised that it had assessed the
environmental impacts of Vista’s development plans for Mt Todd and concluded that it can proceed, subject to a number
of  recommendations  which  are  outlined  in  the  Assessment  Report.  The  NTEPA  Assessment  Report  includes  28
recommendations which are addressed as part of the MMP.

The approval of the EIS resulted in the requirement to obtain an authorization of a controlled activity as required under
the  EPBC  as  it  relates  to  the  Gouldian  Finch.  The  EPBC  authorization  was  granted  by  the  Australian  Commonwealth
Department of Environment and Energy in January 2018.

In November 2018, we applied for the MMP approval, which is the operating permit that sets out how the mine operating
strategy will be implemented throughout the mine life in compliance with the EIS and EPBC requirements. The MMP was
approved in June 2021 and will be amended to align with the larger-scale design in the 2022 FS.

Environmental, Social and Community Factors

A  number  of  environmental  studies  have  been  conducted  at  Mt  Todd  in  support  of  the  EIS  and  as  required  for
environmental  and  operational  permits.  Studies  conducted  have  investigated  soils,  climate  and  meteorology,  geology,
geochemistry, biological resources, cultural and anthropological sites, socio-economics, hydrogeology, and water quality.

45

Table of Contents

The EIS for the Project  was submitted in June 2013. The document was prepared by independent consultants GHD Pty
Ltd  to  identify  potential  environmental,  social,  transport,  cultural  and  economic  impacts  associated  with  reopening  and
operating  the  mine.  NTEPA  provided  its  final  assessment  of  the  Project  in  June  2014.  Final  approval  was  given  in
September 2014.

The Jawoyn people have been consulted with and involved in the planning of the Project. Areas of aboriginal significance
have been designated, and the mine plan has avoided development in these restricted works areas.

Water Treatment

We obtained approval of a waste discharge license from the NT Government that authorized the release of treated water
from  the  Mt  Todd  site  during  the  wet  season  in  accordance  with  an  80%  protection  limit  environmental  standard.  We
discharged  treated  water  in  compliance  with  the  standards.  The  existing  Batman  pit  has  the  capacity  to  contain
approximately  11.5  gigaliters  of  water.  At  the  end  of  December  2021,  the  pit  contained  approximately  0.5  gigaliters  of
water  due  to  previous  dewatering  operations.  The  present  volume  of  water  in  the  pit  will  not  present  any  major  issues
when resuming operations in the Batman pit.

2022 Project Development Plans and Budget

Completing the 2022 FS during the first quarter of 2022 was Vista’s most significant development achievement. With the
results of the 2022 FS announced February 9, 2022, our priority is now directed towards engaging with potential partners,
investors and lenders as we pursue a range of development alternatives. Vista will also continue the “proof of geologic
concept”  exploration  drilling  started  in  2020  to  further  confirm  our  interpretation  of  the  mineralization  and  geologic
structures  between  the  Batman  and  Quigleys.  As  with  drilling  carried  out  during  2020  and  2021,  our  plan  for  2022
includes  widely  spaced  drill  holes  that  are  not  expected  to  provide  sufficient  data  to  develop  any  mineral  resource
estimates.  Recurring  programs  at  Mt  Todd  will  include  continuation  of  our  site-wide  water  management  plan,  geologic
studies on the ELs, and required care and maintenance activities.

Vista expects to incur expenditures of approximately $4,000 during 2022 to carry out the development plans and other Mt
Todd site activities as outlined above. Other activities may be undertaken as Vista continues to consider programs that
that have potential to further increase the value of Mt Todd in a cost-effective manner.

ITEM 3. LEGAL PROCEEDINGS .

We are not aware of a) any material pending litigation or of any proceedings known to be contemplated by governmental
authorities that are, or would be, likely to have a material adverse effect upon us or our operations, taken as a whole and
b) material proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial
owner of more than 5% of our securities or any associate of any such director, officer or security holder is a party adverse
to us or has a material interest adverse to us.

ITEM 4. MINE SAFETY DISCLOSURES.

We consider health, safety and environmental stewardship to be a core value of the Company.

Pursuant to Section 1503(a) of the United States  Dodd-Frank Wall Street Reform and Consumer Protection Act of  2011
(the “Dodd-Frank Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in
the  United  States  are  required  to  disclose  in  their  periodic  reports  filed  with  the  SEC  information  regarding  specified
health  and  safety  violations,  orders  and  citations,  related  assessments  and  legal  actions,  and  mining-related  fatalities
under  the  regulation  of  the  Federal  Mine  Safety  and  Health  Administration  (“MSHA”)  under  the United  States  Federal
Mine  Safety  and  Health  Act  of  1977  (the  “Mine  Act”).  During  the  fiscal  year  ended  December  31,  2021,  we  had  no
properties in the United States and were not subject to regulation by the MSHA under the Mine Act and consequently no
disclosure is required under Section 1503(a) of the Dodd-Frank Act.

46

Table of Contents

PART II

ITEM  5.  MARKET  FOR  REGISTRANT’S  COMMON  EQUITY,  RELATED  STOCKHOLDER  MATTER S  AND  ISSUER
PURCHASES OF EQUITY SECURITIES.

Market and Trading Symbol of Common Shares

The Common Shares of Vista Gold are listed on the NYSE American and the Toronto Stock Exchange under the trading
symbol “VGZ”. On February 22, 2022, the last reported sale price of the Common Shares of Vista on the NYSE American
was $0.81, there were 117,189,232 Common Shares issued and outstanding, and we had approximately 232 registered
shareholders of record. The Company also has 7,408,101 unlisted warrants outstanding that are not actively traded on an
exchange.

Dividends

We have never paid cash dividends. The declaration and payment of future dividends, if any, will be determined by our
Board and will depend on our earnings, financial condition, conditions that may be imposed by future potential financing
arrangements, future cash requirements and other relevant factors.

Securities Authorized for Issuance under Equity Compensation Plans

The following table sets out information relating to the Company’s equity compensation plans as of December 31, 2021.
The  Company’s  equity  compensation  plans  as  of  December  31,  2021  were  the  Stock  Option  Plan,  the  Long-Term
Incentive  Plan  (“LTIP”),  and  the  Deferred  Share  Unit  Plan  (“DSU  Plan”).  Equity  compensation  under  these  plans  has
been granted to directors, officers, employees and consultants of the Company, as applicable.

Number of securities to be
issued upon
exercise/conversion of
outstanding options and
rights
(a)

Weighted-average exercise
price of outstanding
options and rights
(b)

Number of securities
remaining available for
future grants under equity
compensation plans
(excluding securities
reflected in column (a))
(c)

4,295,339

N/A

4,295,339

0.23

N/A

0.23

7,423,584

N/A

7,423,584

 Plan Category

Equity compensation
plans approved by
securityholders
Equity compensation
plans not approved by
securityholders
Total

As of December 31, 2021, 1,998,339 restricted share units (“RSUs”) were outstanding under the LTIP, 930,000 deferred
share  units  (“DSUs”)  were  outstanding  under  the  DSU  Plan,  and  1,367,000  options  were  outstanding  under  the  Stock
Option Plan to acquire an aggregate of 4,295,339 Common Shares.

See  Note  6  to  our  consolidated  financial  statements  contained  in  “Part  II.  Item  8.  Financial  Statements  and
Supplementary Data” for additional information relating to our equity compensation plan.

Exchange Controls

There are no governmental laws, decrees or regulations in Canada that restrict the export or import of capital, including
foreign exchange controls, or that affect the remittance of dividends, interest or other payments to non-resident holders of

47

Table of Contents

the securities of Vista, other than Canadian withholding tax. See “Certain Canadian Federal Income Tax Considerations
for U.S. Residents” below.

Certain Canadian Federal Income Tax Considerations for U.S. Residents

The  following  summarizes  certain  Canadian  federal  income  tax  consequences  generally  applicable  under  the  Income
Tax  Act  (Canada)  and  the  regulations  enacted  thereunder  (collectively,  the  “Canadian  Tax  Act”)  and  the  Canada-
United States Income Tax Convention (1980) (the “Convention”) to the holding and disposition of Common Shares.

Comment is restricted to holders of Common Shares each of whom, at all material times for the purposes of the Canadian
Tax Act and the Convention:

(i)
(ii)
(iii)
(iv)

(v)
(vi)
(vii)

is resident solely in the United States;
is entitled to the benefits of the Convention;
holds all Common Shares as capital property;
holds no Common Shares that are “taxable Canadian property” (as defined in the Canadian Tax Act) of the
holder;
deals at arm’s length with and is not affiliated with Vista;
does not and is not deemed to use or hold any Common Shares in a business carried on in Canada; and
is not an insurer that carries on business in Canada and elsewhere;

(each such holder, a “U.S. Resident Holder”).

Certain U.S.-resident entities that are fiscally transparent for United States federal income tax purposes (including limited
liability  companies)  are  generally  not  themselves  entitled  to  the  benefits  of  the  Convention.  However,  members  of  or
holders  of  an  interest  in  such  entities  that  hold  Common  Shares  may  be  entitled  to  the  benefits  of  the  Convention  for
income derived through such entities. Such members or holders should consult their own tax advisors in this regard.

Generally, a holder’s Common Shares will be considered to be capital property of the holder provided that the holder is
not a trader or dealer in securities, did not acquire, hold or dispose of the Common Shares in one or more transactions
considered to be an adventure or concern in the nature of trade and does not hold the Common Shares as inventory in
the course of carrying on a business.

Generally, a holder’s Common Shares will not be “taxable Canadian property” of the holder at a particular time at which
the Common Shares are listed on a “designated stock exchange” (which currently includes the TSX) unless both of the
following conditions are met at any time during the 60-month period ending at the particular time:

(i)

the holder, persons with whom the holder does not deal at arm’s length, or any partnership in which the holder or
persons  with  whom  the  holder  did  not  deal  at  arm’s  length  holds  a  membership  interest  directly  or  indirectly
through one or more partnerships, alone or in any combination, owned 25% or more of the issued shares of any
class of the capital stock of Vista; and

(ii) more than 50% of the fair market value of the Common Shares was derived directly or indirectly from, or from
any combination of, real or immovable property situated in Canada, “Canadian resource properties” (as defined
in the Canadian Tax Act), “timber resource properties” (as defined in the Canadian Tax Act), or options in respect
of or interests in such properties.

In certain other circumstances, a Common Share may be deemed to be “taxable Canadian property” for purposes of the
Canadian Tax Act.

This  summary  is  based  on  the  current  provisions  of  the  Canadian  Tax  Act  and  the  Convention  in  effect  on  the  date
hereof, all specific proposals to amend the Canadian Tax Act and Convention publicly announced by or on behalf of the
Minister  of  Finance  (Canada)  on  or  before  the  date  hereof,  and  the  current  published  administrative  and  assessing
policies of the CRA. It is assumed that all such amendments will be enacted as currently proposed, and that there will be
no  other  material  change  to  any  applicable  law  or  administrative  or  assessing  practice,  although  no  assurance  can  be
given in these respects.

48

Table of Contents

Except as otherwise expressly provided, this summary does not take into account any provincial, territorial or foreign tax
considerations, which may differ materially from those set out herein.

This  summary  is  of  a  general  nature  only,  is  not  exhaustive  of  all  possible  Canadian  federal  income  tax
considerations, and is not intended to be and should not be construed as legal or tax advice to any particular
U.S. Resident Holder. U.S. Resident Holders are urged to consult their own tax advisers for advice with respect
to their particular circumstances. The discussion below is qualified accordingly.

A U.S. Resident Holder who disposes or is deemed to dispose of one or more Common Shares generally should
not  thereby  incur  any  liability  for  Canadian  federal  income  tax  in  respect  of  any  capital  gain  arising  as  a
consequence of the disposition.

A U.S. Resident Holder to whom Vista pays or is deemed to pay a dividend on the holder’s Common Shares will
be  subject  to  Canadian  withholding  tax,  and  Vista  will  be  required  to  withhold  the  tax  from  the  dividend  and
remit it to the CRA for the holder’s account. The rate of withholding tax under the Canadian Tax Act is 25% of the
gross amount of the dividend (subject to reduction under the provisions of an applicable tax treaty). Under the
Convention,  a  U.S.  Resident  Holder  who  beneficially  owns  the  dividend  will  generally  be  subject  to  Canadian
withholding  tax  at  the  rate  of  15  %  (or  5%,  if  the  U.S.  Resident  Holder  who  beneficially  owns  the  dividend  is  a
company that is not fiscally transparent and which owns at least 10% of the voting stock of Vista) of the gross
amount of the dividend.

Certain United States Federal Income Tax Considerations for U.S. Residents

There may be material tax consequences to U.S. Residents in relation to an acquisition or disposition of Common Shares
or other securities of the Company. U.S. Residents should consult their own legal, accounting and tax advisors regarding
such tax consequences under United States, state, local or foreign tax law regarding the acquisition or disposition of our
Common Shares or other securities, in particular, the tax consequences of the Company likely being a PFIC within the
meaning of Section 1297 of the United States Internal  Revenue  Code. See the section “Item 1A. – Risk Factors – The
Company is likely a PFIC, which will likely have adverse U.S. federal income tax consequences for U.S. shareholders”
above.

Unregistered Sales of Equity Securities

None.

Repurchase of Securities

During 2021, neither Vista nor any affiliate of Vista repurchased Common Shares of Vista registered under Section 12 of
the Exchange Act.

NYSE American Corporate Governance

Section  110  of  the  NYSE  American  Company  Guide  permits  the  NYSE  American  to  consider  the  laws,  customs  and
practices  of  foreign  issuers  in  relaxing  certain  NYSE  American  listing  criteria,  and  to  grant  exemptions  from  NYSE
American listing criteria based on these considerations. A company seeking relief under these provisions is required to
provide  written  certification  from  independent  local  counsel  that  the  non-complying  practice  is  not  prohibited  by  home
country law. A description of the significant ways in which the Company’s governance practices differ from those followed
by domestic companies pursuant to NYSE American standards is as follows:

Shareholder  Meeting  Quorum  Requirement:   The  NYSE  American  minimum  quorum  requirement  for  a
shareholder meeting is one-third of the outstanding shares of common stock. In addition, a company listed on the
NYSE American is required to state its quorum requirement in its bylaws. The Corporation’s quorum requirement
is set forth in its articles under the laws of the Province of British Columbia, Canada. Under the Articles of the

49

Table of Contents

Corporation,  the  quorum  for  the  transaction  of  business  at  the  Meeting  is  two  or  more  shareholders  entitled  to
vote at the meeting represented in person or by proxy.

The foregoing are consistent with the laws, customs and practices in Canada.

ITEM  7.  MANAGEMENT’S  DISCUSSION  AND  ANALYSIS  OF  FINANCIAL  CONDITION  AND  RESULT S
OF OPERATIONS.

The following discussion and analysis should be read in conjunction with our consolidated financial statements for the two
years ended December 31, 2021 and 2020, and the related notes thereto, which have been prepared in accordance with
generally  accepted  accounting  principles  in  the  United  States  (“U.S.  GAAP”).  This  discussion  and  analysis  contains
forward-looking statements that involve risks, uncertainties and assumptions. Our actual results may differ materially from
those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set
forth  under  the  section  heading  “Item  1A.  Risk  Factors”  above  and  elsewhere  in  this  annual  report  on  Form  10-K.  See
section heading “Note Regarding Forward-Looking Statements” above.

All dollar amounts stated herein are in U.S. dollars in thousands, unless specified otherwise, except per share-
related  amounts.  References  to  A$  refer  to  Australian  currency  and  USD  or  $  to  United  States  currency. The
scientific and technical disclosures about Mt Todd in this discussion and analysis have been reviewed and approved by
John  W.  Rozelle,  Senior  Vice  President  of  Vista.  Mr.  Rozelle  is  a  qualified  person  as  defined  by  subpart  1300  of
Regulation  S-K  (“S-K  1300”) under  the  Securities  Exchange  Act  of  1934,  as  amended  and  Canadian  National
Instrument 43-101 – Standards of Disclosure for Mineral Projects .

Overview

Vista Gold Corp. and its subsidiaries (collectively, “Vista,” the “Company,” “we,” “our,” or “us”) operate in the gold mining
industry.  We  are  focused  on  evaluation,  acquisition,  exploration  and  advancement  of  gold  exploration  and  potential
development  projects,  which  may  lead  to  gold  production  or  value  adding  strategic  transactions  such  as  earn-in  right
agreements,  option  agreements,  leases  to  third  parties,  joint  venture  arrangements  with  other  mining  companies,  or
outright  sales  of  assets  for  cash  and/or  other  consideration.  We  look  for  opportunities  to  improve  the  value  of  our  gold
projects through exploration drilling and/or technical studies focused on optimizing previous engineering work. We do not
currently generate cash flows from mining operations.

The Company’s flagship asset is its 100% owned Mt Todd gold project (“Mt Todd” or the “Project”) in Northern Territory,
Australia. Mt Todd is the largest undeveloped gold project in Australia. With the approval of the Mining Management Plan
(“MMP”) in June 2021, all major operating and environmental permits for Mt Todd have been received. Since acquiring Mt
Todd in 2006, we have invested substantial financial resources to systematically explore, evaluate, engineer, permit and
de-risk the Project. In February 2022, we completed a feasibility study in respect of Mt Todd (the “2022 FS”). We believe
this work has added substantial value to the Project and positions the Project for near-term development.

The  2022  FS  highlights  a  19%  increase  in  gold  reserves  from  5.85  million  ounces,  as  reported  in  the  Company’s
amended  2019  pre-feasibility  study,  to  6.98  million  ounces,  supporting  an  operation  with  average  annual  production  of
479,000 ounces of gold during the first seven years of commercial operations and a low operating cost profile that delivers
significant  cash  flows  over  a  16-year  mine  life.  See  “Mineral  Resources  and  Mineral  Reserve  Estimates”  below  for
additional  information.  The  2022  FS  reflects  the  inflationary  pressures  being  faced  currently  by  all  operators  and
developers in the mining industry. While management believes this inflationary trend is transitory, management believes
the resilience of Mt Todd is demonstrated by the project economics reflected in the 2022 FS.

Mt Todd’s economic returns benefit from the increase in the gold reserve estimate, favorable results of the power plant
trade-off  study  and  slightly  lower  energy  costs  in  the  NT.  The  increase  in  estimated  gold  reserves  resulted  from
increasing the gold price used in the reserve estimate from $1,000 to $1,125 and changing the cut-off grade from 0.40 g
Au/t to 0.35 g Au/t. Our decision to use a third-party power provider resulted in important positive impacts to our capital
costs  and  insulates  the  Project  from  certain  construction  and  operating  risks  while  maintaining  what  we  believe  to  be
attractive

50

Table of Contents

operating costs. While our operating costs have increased as a result of higher labor, reagent, grinding media and over-
the-fence power costs, our core energy costs yield some offsetting savings.

Management  believes  the  results  of  the  2022  FS  will  appeal  to  potential  partners,  investors  and  lenders  and  allow  the
Company to evaluate a range of development alternatives as we continue to focus on maximizing shareholder value.

The Company continues to focus on monetizing non-core assets as a non-dilutive source of funding. Vista realized $2,500
in  January  2022  in  exchange  for  cancelling  its  remaining  royalty  interests  in  Awak  Mas.  The  Company  also  owns  a
royalty interest in a U.S. exploration-stage project and used mill equipment that is being marketed by a third-party mining
equipment dealer.

COVID-19 Pandemic Update

Vista’s  response  to  the  COVID-19  pandemic  has  been  to  ensure  the  health  and  safety  of  its  employees  and  other
stakeholders.  We  continue  to  follow  mitigation  measures  recommended  by  government  and  health  agencies  in  the
jurisdictions where we operate. Australia has recently lifted restrictions on international travel to and from the country for
fully  vaccinated  individuals.  Vista  has  incurred  costs  while  certain  corporate  objectives,  including  efforts  to  seek  a
strategic development partner or other form of transaction, were extended due to previous travel restrictions. These and
other  conditions  may  ultimately  have  a  material  adverse  impact  on  the  Company’s  financial  condition  and  results  of
operations. See “Liquidity and Capital Resources” and “Risk Factors” for additional information.

Mineral Resources and Mineral Reserves Estimates

The table below presents the estimated mineral resources for the Project. The effective  date of the resource estimates is
December 31, 2021. The following mineral resources and mineral reserves were prepared in accordance with both S-K
1300 standards and CIM Definition Standards.

Mt Todd Mineral Resources

Batman Deposit

Heap Leach Pad

Quigleys Deposit

Total

Tonnes
(000s)

 77,725
 200,112

Grade
(g Au/t)

 0.88
 0.80

Contained
Ounces
(000s)

 2,191
 5,169

Tonnes
(000s)

 —
 13,354

Grade
(g Au/t)

 —
 0.54

 277,837  
 61,323  

 0.82  
 0.72  

 7,360

 1,421

 13,354  
 —  

 0.54  
 —  

Contained
Ounces
(000s)

 —
 232

 232

 —

Tonnes
(000s)

 594
 7,301

Grade
(g Au/t)

 1.15
 1.11

 7,895  
 3,981  

 1.11  
 1.46  

Contained
Ounces
(000s)

Tonnes
(000s)

Grade
(g Au/t)

Contained  
Ounces
(000s)

 22
 260

 282

 187

 78,319
 220,767  

 0.88
 0.80  

 2,213
 5,661

 299,086  
 65,304  

 0.82  
 0.77  

 7,874

 1,608

Measured
Indicated
Measured
&
Indicated
Inferred
Notes:

● Measured & indicated resources include proven and probable reserves.
●

Batman and Quigleys resources are quoted at a 0.40g-Au/t cut-off grade. Heap Leach resources are the average grade of
the heap, no cut-off applied.
Batman:  Resources  constrained  within  a  US$1,300/oz  gold  WhittleTM  pit  shell.  Pit  parameters:  Mining  Cost
US$1.50/tonne, Milling Cost US$7.80/tonne processed, G&A Cost US$0.46/tonne processed, G&A/Year 8,201 K US$, Au
Recovery, Sulfide 85%, Transition 80%, Oxide 80%, 0.2g-Au/t minimum for resource shell.

●

● Quigleys:  Resources  constrained  within  a  US$1,300/oz  gold  WhittleTM  pit  shell.  Pit  parameters:  Mining  cost
US$1.90/tonne,  Processing  Cost  US$9.779/tonne  processed,  Royalty  1%  GPR,  Gold  Recovery  Sulfide,  82.0%  and
Ox/Trans 78.0%, water treatment US$0.09/tonne, Tailings US$0.985/tonne.

● Differences  in  the  table  due  to  rounding  are  not  considered  material.  Differences  between  Batman  and  Quigleys  mining

and metallurgical parameters are due to their individual geologic and engineering characteristics.

● Rex Bryan of Tetra Tech is the QP responsible for the Statement of Mineral Resources for the Batman, Heap Leach Pad

and Quigleys deposits.
Thomas Dyer of RESPEC is the QP responsible for developing the resource WhittleTM pit shell for the Batman Deposit.
The effective date of the Heap Leach, Batman and Quigleys resource estimate is December 31, 2021.

●
●
● Mineral  resources  that  are  not  mineral  reserves  have  no  demonstrated  economic  viability  and  do  not  meet  all  relevant

modifying factors.

51

 
 
Table of Contents

Mt Todd Gold Project Mineral Reserves – 50,000 tpd, 0.35 g Au/t cut-off and $1,125 per ounce pit design

Batman Deposit

Heap Leach Pad

Total

     Contained     

     Contained     

     Contained  

     Tonnes      Grade      Ounces
(000s)

(g Au/t)

(000s)

     Tonnes      Grade      Ounces
(000s)

(g Au/t)

(000s)

Tonnes      Grade      Ounces
(000s)
(g Au/t)
(000s)

Proven
Probable
Proven & Probable
Economic analysis conducted only on proven and probable mineral reserves.

 81,277
 185,744
 267,021

 0.84  
 0.76  
 0.79  

 2,192
 4,555
 6,747

   13,354
   13,354

 —  

 —  
 0.54  
 0.54  

 —  

 232
 232

 81,277
   199,098
   280,375

 0.84  
 0.75  
 0.77  

 2,192
 4,787
 6,979

Notes:
●
●
● Deepak Malhotra is the QP responsible for reporting the heap-leach pad reserves.
●

Thomas L. Dyer, P.E., is the QP responsible for reporting the Batman Deposit Proven and Probable reserves.
Batman deposit reserves are reported using a 0.35 g Au/t cutoff grade.

Because all the heap-leach pad reserves are to be fed through the mill, these reserves are reported without a cutoff grade
applied.
The reserves point of reference is the point where material is fed into the mill.
The effective date of the mineral reserve estimates is December 31, 2021.

●
●

Cautionary note to investors: Proven and probable mineral reserves are estimated in accordance with  each of S-
K 1300 and CIM Definition Standards. A number of risk factors may adversely affect estimated mineral reserves
and  mineral  resources,  any  of  which  may  result  in  a  reduction  or  elimination  of  reported  mineral  reserves  and
mineral resources. See “Item 1A. Risk Factors.”

Results from Operations

Summary

Consolidated net loss for the year ended December 31, 2021 was $15,237, or $0.14 per common share in the capital of
Vista  (each,  a  “Common  Share”)  on  both  a  basic  and  diluted  basis.  Consolidated  net  income  for  the  year  ended
December 31, 2020 was $420, or $0.00 per Common Share on both a basic and diluted basis. The principal components
of our 2021 net loss and the year-over-year changes are discussed below.

The  Company  had  cash  and  short-term  investments  totaling  $13,141,  working  capital  of  $12,164,  and  no  debt  as  of
December 31, 2021.

Gain on Disposal of Mineral Property Interests, Net

In  January  and  June  2021,  the  Company  received  a  total  of  $2,100  for  cancellation  of  its  royalty  interests  and  back-in
right in the Guadalupe de los Reyes gold and silver project in Sinaloa, Mexico (“Los Reyes”). The January 2021 payment
of $1,100 was initially recorded as deferred option gain, with the full $2,100 being recognized as a gain upon receipt of
the second payment of $1,000 in June 2021.

The gain on disposal of mineral property interests was $6,108 for the year ended December 31, 2020. This gain resulted
from  two  transactions.  In  May  2020,  we  recognized  $2,568  for  the  partial  cancelation  of  a  net  smelter  return  royalty
(“NSR”) on gold ounces produced at the Awak Mas project. Then in July 2020, the Company recognized a gain of $3,540
upon  receipt  of  the  final  $1,500  Los  Reyes  option  payment  and  transferred  control  of  the  project  to  Prime  Mining
Corporation.

Exploration, Property Evaluation and Holding Costs

Exploration,  property  evaluation  and  holding  costs,  including  fixed  costs,  discretionary  programs,  and  non-cash  stock-
based compensation, were $7,942 and $4,545 during the years ended December 31, 2021 and 2020, respectively. These
costs were predominantly associated with Mt Todd and were comprised of fixed costs and discretionary costs.

52

 
    
    
    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Table of Contents

For the years ended December 31, 2021 and 2020, our fixed exploration, property evaluation and holding costs totaled
$3,855 and $3,266, respectively. These costs included expenditures necessary to ensure that we preserve our property
rights  and  meet  our  safety,  regulatory  and  environmental  responsibilities.  The  principal  components  of  the  increase  in
2021  included  greater  direct  involvement  by  corporate  personnel  on  specific  Mt  Todd  activities  and  higher  personnel
costs.

Expenses incurred for 2021 Mt Todd discretionary programs totaled $4,087. Such discretionary programs include $2,232
for preparing the 2022 FS and $1,702 for exploration drilling, plus additional staffing expenses to support drilling and other
activities.  Expenses  for  2020  discretionary  programs  totaled  $1,279.  These  programs  included  geotechnical  and
exploration  drilling,  activities  to  support  the  government’s  review  of  Vista’s  operational  MMP,  modification  of  our
agreement  with  the  Jawoyn  Association  Aboriginal  Corporation  (the  “Jawoyn”)  and  the  strategic  initiative  to  secure  a
development partner for Mt Todd.

Included  in  the  2021  and  2020  exploration,  property  evaluation  and  holding  costs  were  non-cash  stock-based
compensation of $354 and $332, respectively.

Corporate Administration

Corporate  administration  costs  were  $3,945  and  $3,777  during  the  years  ended  December  31,  2021  and  2020,
respectively.  The  2021  and  2020  corporate  administration  costs  included  non-cash  stock-based  compensation  of  $533
and  $581,  respectively.  Costs  were  generally  higher  during  2021  due  to  higher  insurance  and  personnel  expenses,
partially offset by lower legal and compliance costs.

Write-down of plant and equipment

During the year ended December 31, 2021, the Company reduced the carrying value of the used mill equipment to $nil
based  on  management’s  estimate  of  recoverability.  This  estimate  reflects  management’s  consideration  of  the  duration
this equipment has been actively marketed by an independent broker and the current competitive market conditions for
used  equipment  yielding  no  sales.  These  inputs  used  in  valuing  our  used  mill  equipment  involved  a  high  degree  of
subjectivity  and  resulted  in  management  not  having  the  ability  to  estimate  recoverable  sales  proceeds  with  sufficient
certainty.  The  Company  recorded  this  reduction  as  an  operating  loss  of  $5,500  in  our  Consolidated  Statements  of
Income/(Loss). The used mill equipment continues to be marketed by the independent broker.

Non-Operating Income and Expenses

Gain on Other Investments

Gain  on  other  investments  was  $46  and  $2,405  for  the  years  ended  December  31,  2021  and  2020,  respectively.  On
September 22, 2021, the shareholders of Nusantara Resources Limited (“Nusantara Resources”) approved a scheme of
arrangement  whereby  PT  Indika  Mineral  Investindo  offered  to  acquire  all  issued  shares  of  Nusantara  Resources  for
A$0.35 per share. The transaction closed in October 2021, resulting in Vista receiving $339 upon tendering its Nusantara
Resources shares and recording a gain of $46. The Company sold all of its remaining 6,882,115 shares of Midas Gold
Corp. and received net proceeds of $5,788 during the year ended December 31, 2020, which made up a majority of the
gain in 2020.

Financial Position, Liquidity and Capital Resources

Operating Activities

Net  cash  used  in  operating  activities  was  $10,620  and  $6,955  for  the  years  ended  December  31,  2021  and  2020,
respectively. The increase in net cash used in operating activities resulted from higher cash expenditures for exploration
and property evaluation, including continuation of exploration drilling throughout 2021, and expenses associated with the
2022 FS.

53

Table of Contents

Investing Activities

Net cash provided by investing activities of $2,631 for the year ended December 31, 2021 resulted primarily from receipt
of $2,100 under the Los Reyes agreement, $339 from the sale of Nusantara Resources shares, and $315 for payments
related to Awak Mas, offset by fixed asset purchases of $139.

Net cash provided by investing activities of $11,628 for the year ended December 31, 2020 resulted primarily from $5,788
received from the sale of our Midas Gold Corp. shares, $3,048 received for both the partial cancellation of the Awak Mas
royalty and the receipt of the final Los Reyes option payment, and $2,860 of net redemptions of short-term investments
comprised of U.S. Government Treasury bills and notes.

Financing Activities

Net  cash  of  $12,984  for  the  year  ended  December  31,  2021  was  provided  by  net  proceeds  of  $12,323  from  the
Company’s  July  2021  public  offering  (“2021  Offering”)  (described  below)  and  $1,062,  which  included  $191  relating  to
sales in 2020 that settled for cash in January 2021, under the ATM Program (defined below), partially offset by payments
of $401 for employee withholding tax obligations in lieu of issuing Common Shares.

Net cash of $1,681 for the year ended December 31, 2020 was provided mainly from net proceeds from equity financing
of $1,768, which was received upon issuance of Common Shares under our ATM Program, partially offset by payments of
$124 for employee withholding tax obligations in lieu of issuing Common Shares

Liquidity and Capital Resources

Cash,  cash  equivalents  and  short-term  investments  totaled  $13,141  at  December  31,  2021  compared  to  $8,162  at
December  31,  2020.  The  net  increase  of  $4,979  during  2021  reflects  net  proceeds  of  $12,323  from  the  2021  Offering,
$2,100  for  cancellation  of  the  royalty  interests  and  back-in  right  in  Los  Reyes,  $1,062  raised  under  the  ATM  Program,
$339  of  proceeds  from  sale  of  the  Nusantara  Resources  shares  and  $315  for  payments  to  Vista  related  to  Awak  Mas.
These  cash  inflows  were  offset  by  expenditures  of  $11,160.  For  additional  details  see  the  “Results  from  Operations”
section  above  and  the  preceding  discussions  in  this  section  of  operating  activities,  investing  activities  and  financing
activities.

During July 2021, we closed the 2021 Offering of 12,272,730 units (the “Units”) for net proceeds of $12,323. Each Unit
consisted of one Common Share and one-half of one Common Share purchase warrant (each full warrant, a “Warrant”).
Each Warrant entitles the holder thereof to purchase one Common Share at a price of $1.25 per Common Share (subject
to  adjustment  in  certain  circumstances)  and  is  exercisable  until  July  12,  2024.  See  footnote  6  to  the  accompanying
financial statements for more details on the 2021 Offering. The Company has allocated and intends to continue to allocate
the proceeds from the 2021 Offering to advance programs at Mt Todd by further refining technical aspects of the Project,
enhancing  economic  returns,  and  supporting  the  Company’s  objective  of  securing  a  development  partner.  Among  the
programs funded with these net proceeds were additional drilling of a third phase in the current exploration program and
work towards completing the 2022 FS, as well as related engineering/design work and other technical studies. Remaining
proceeds  will  be  used  for  working  capital  requirements  and/or  for  other  general  corporate  purposes,  which  include
ongoing  regulatory,  legal  and  accounting  expenses,  management  and  administrative  expenses,  and  other  corporate
initiatives.

As a secondary measure of liquidity, the Company had working capital of $12,164 as of December 31, 2021. This amount
included a deferred option gain of $383 related to the Awak Mas transaction. The deferred option gains will ultimately be
recognized  as  income  and  not  require  any  use  of  current  assets.  Consequently,  the  components  of  working  capital
affecting Vista’s liquidity and capital resources as of December 31, 2021 included current assets totaling $13,952 offset
by accounts payable and accrued liabilities of $1,405. This compares to current assets totaling $9,407 offset by accounts
payable and accrued liabilities of $1,058 at December 31, 2020.

Vista  has  implemented  certain  health  and  safety  standards  in  response  to  the  COVID-19  pandemic,  the  cost  of  which
have been minimal. However, we incurred other corporate and Mt Todd costs while certain corporate objectives, including
efforts  to  secure  a  strategic  development  partner  or  other  form  of  transaction  were  extended  due  to  travel  restrictions.
Australia recently lifted restrictions on international travel to and from the country for fully vaccinated individuals.

54

Table of Contents

Although management believes this is a positive event, its ultimate impact on the Company’s costs and timing to achieve
objectives cannot be determined at this time. To date, Vista has maintained sufficient working capital by monetizing non-
core assets, limited use of the ATM Program, and the 2021 Offering. However, continuing implications of the COVID-19
pandemic,  the  extent  of  economic  recovery,  and  other  conditions  affecting  the  Company  could  affect  the  Company’s
ability  to  raise  additional  working  capital  on  reasonable  terms,  or  at  all.  These  conditions  and  the  impact  on  investors,
banking institutions, businesses, the global economy or financial and commodity markets may have a material adverse
impact on the Company’s financial condition and results of operations.

With the recent completion of the 2022 FS, the most significant discretionary program in progress is the current phase of
exploration  drilling.  We  will  have  final  payments  during  2022  to  vendors  for  work  to  finalize  the  2022  FS.  Management
estimates total remaining 2022 cash expenditures for these programs and several other smaller discretionary programs
will total approximately $1,900, $550 of which was included in accounts payable and accrued liabilities at year end 2021.
Other potential discretionary programs that may be undertaken during 2022 could total up to an additional $800. Fixed
costs for corporate activities and Mt Todd care and maintenance are expected to be approximately $7,000 in 2022. Cash
inflows during 2022 from non-core assets include the $2,500 received in January 2022 for canceling the remaining Awak
Mas royalties. Other potential sources of cash inflows include additional monetization of non-core assets and limited use
of the ATM Program.

Giving consideration to conditions associated with the pandemic and the Company’s ongoing initiatives, we believe our
existing working capital as of December 31, 2021, together with other potential future sources of non-dilutive financing,
will be sufficient to fully fund our currently planned corporate expenses, Project holding costs and discretionary programs
for at least 12 months.

We  are  evaluating  potential  partners,  investors  and  lenders  as  we  pursue  a  range  of  development  alternatives  for  Mt
Todd. Activities to date have focused largely on a joint venture transaction., The objective of this approach is to receive a
purchase  price  reflective  of  the  intrinsic  value  of  Mt  Todd.  With  completion  of  the  2022  FS,  management  is  also
evaluating other alternatives and we plan to consider other transaction arrangements that meet our expectations to realize
an  appropriate  valuation  for  our  shareholders.  There  can  be  no  assurance  that  we  will  be  successful  in  securing  a
development partner or other transaction on acceptable terms, or at all.

For ongoing working capital requirements, the Company continues to focus on monetizing non-dilutive non-core assets as
a  source  of  funding.  Vista  realized  $2,500  in  January  2022  in  exchange  for  cancelling  its  remaining  royalty  interests  in
Awak Mas. The Company also owns another royalty interest in the U.S. and used mill equipment that is being marketed
by a third-party mining equipment dealer.

The Company was party to an at-the-market offering agreement (the “ATM Agreement”) with H. C. Wainwright & Co. LLC
(“Wainwright”) to provide balance sheet flexibility at a potentially lower cost than other means of equity issuances. Under
the ATM Agreement the Company could, but was not obligated to, issue and sell Common Shares through Wainwright for
aggregate sales proceeds of up  to  $10,000  (the  “ATM  Program”).  The  ATM  Agreement  was  amended  in  June  2020  to
remain  in  force  until  terminated  by  either  party.  Through  June  30,  2021,  aggregate  net  proceeds  sold  under  the  ATM
Program  totaled  $2,830,  which  included  $871  during  the  six-months  ended  June  30,  2021.  In  July  2021,  the  ATM
Program was suspended in conjunction with the 2021 Offering.

Vista subsequently filed for and received notice of effectiveness of a new shelf registration statement in November 2021
with  the  Securities  and  Exchange  Commission.  In  December  2021,  the  Company  renewed  the  ATM  Agreement  on
substantially  the  same  terms  to  provide  for  aggregate  sales  proceeds  up  to  $10,000  from  and  after  the  date  of  the
renewed  ATM  Agreement  (the  “2021  ATM  Program”).  The  entire  $10,000  under  the  2021  ATM  Program  remained
available as of December 31, 2021.

Offers  or  sales  of  Common  Shares  under  the  2021  ATM  Program  will  be  made  only  in  the  United  States  in  an  “at  the
market  offering”  as  defined  in  Rule  415  under  the  United  States  Securities  Act  of  1933,  as  amended,  subject  to  an
effective registration statement under the U.S. Securities Act of 1933, as amended, and no offers or sales of Common
Shares  under  the  ATM  Agreement  will  be  made  in  Canada.  The  Common  Shares  will  be  distributed  at  market  prices
prevailing at the time of sale.

55

Table of Contents

Vista’s  long-term  viability  depends  upon  our  ability  to  realize  value  from  our  principal  asset,  Mt  Todd.  Our  primary
objective is to maintain adequate liquidity and seek to preserve, enhance and realize value of our core assets in order to
achieve positive returns for our shareholders. Our funding strategy is to maintain a low expenditure profile, realize value
from non-core assets and, when necessary, issue additional equity or find other means of financing. The underlying value
and recoverability of the amounts shown as mineral properties and plant and equipment in our Condensed Consolidated
Balance Sheets are dependent on our ability to attract sufficient capital resources to execute our strategy and the ultimate
success of our programs to enhance and realize value, most importantly at Mt Todd.

Fair Value Accounting

The following table sets forth the Company’s assets measured at fair value within the fair value hierarchy. As required by
accounting guidance, assets are classified in their entirety based on the lowest level of input that is significant to the fair
value measurement.

Fair Value at December 31, 2021

Other investments
Used mill equipment (non-recurring)

Other investments

     Total 
$
$

     Level 1      Level 3  
 — $
 — $

 —
 —

 — $
 — $

Fair Value at December 31, 2020

     Total 
$  293

     Level 1      Level 3  

$  293

$

 —

Other investments were classified as Level 1 of the fair value hierarchy as they were valued at unadjusted quoted market
prices  in  an  active  market  and  included  in  other  investments  on  the  Consolidated  Balance  Sheets  for  each  period
presented.

There  were  no  material  transfers  between  levels  nor  were  there  any  changes  in  valuation  techniques  in  2021.  At
December  31,  2021,  the  value  of  other  investments  was  $nil  because  the  Nusantara  Resources  shares  were  sold  in
October 2021.

Off-Balance Sheet Arrangements

We have no off-balance sheet arrangements required to be disclosed in this annual report on Form 10-K.

Summary of Quarterly Results

2021

2020

Revenue
Net income/(loss)
Basic income/(loss) per share

Revenue
Net income/(loss)
Basic income/(loss) per share

4th quarter

3rd quarter

2nd quarter

1st quarter

 — $

$
 — $
$  (8,316) $  (3,069) $
$
$  (0.08)

$  (0.02)

 — $

 —
 (753) $  (3,099)
$  (0.03)
 (0.01)

$
 — $
$  (2,202) $  4,220
 0.05
$  (0.03)

$

$  1,902
 0.01
$

 — $

 — $

 —
$  (3,500)
$  (0.03)

Critical Accounting Estimates and Recent Accounting Pronouncements

Critical Accounting Estimates

Critical accounting estimates are accounting estimates that involve a significant level of estimation uncertainty and have
had or are reasonably likely to have a material impact on the financial condition or results of operations of the Company.
Management  has  identified  the  following  critical  accounting  estimates.  See  Note  2  to  our  consolidated  financial
statements contained in “Part II. Item 8. Financial Statements and Supplementary Data” for additional accounting policies
and estimates.

56

    
    
    
    
Table of Contents

Impairment Assessment of Long-Lived Assets

Our long-lived assets are evaluated for impairment when information becomes available indicating that the carrying value
may not be recoverable. The inputs used in the valuing our used mill equipment included the duration this equipment has
been  actively  marketed  by  an  independent  broker  and  the  current  competitive  market  conditions  for  used  equipment
yielding no sales. These inputs involved a high degree of subjectivity and were considered by management in its estimate
of recoverable sales proceeds.

Assumptions  and  estimates  considered  in  valuing  our  mineral  properties  included  management’s  expectations  for  the
price of gold, foreign exchange rates, costs to build and operate the mine, and projected cash flows. These assumptions
are  subjective  and  subject  to  uncertainty  over  an  extended  period  of  time.  A  feasibility  study  reduces  the  uncertainty
around some assumptions to an acceptable level and is a primary source of evidence.

Stock-Based Compensation

Our stock plans include awards that vest based on performance criteria. Stock-based compensation expense for these
awards is estimated quarterly, including adjustments to previous recognized expense, based on anticipated achievement
of  performance  criteria.  The  quarterly  estimated  vesting  percentage  reflects  management’s  assessment  of  progress  in
accomplishing  defined  corporate  objectives.  Upon  vesting,  current  period  expense  is  adjusted  based  on  the  actual
achievement of performance criteria.

Income Taxes

We have assets, hold interests, and conduct activities in several countries and are subject to their tax regimes. Tax laws
are complex and continue to evolve. While we have a history of losses, our assumptions made in tax returns are subject
to review and interpretation by taxing authorities and could be modified. Our critical tax estimates include timing of future
income,  deductibility  of  expenses,  sustainability  of  tax  positions,  valuation  allowances  on  deferred  tax  assets,  and
allocation of expenses between companies.

Recent Accounting Pronouncements

See  Note  2  to  our  consolidated  financial  statements  contained  in  “Part  II.  Item  8.  Financial  Statements  and
Supplementary Data” for recent accounting pronouncements applicable to the Company.

Non-U.S. GAAP Financial Measures

In this report, we have provided information prepared or calculated according to U.S. GAAP, as well as provided certain
non-U.S.  GAAP  prospective  financial  performance  measures.  Because  the  non-U.S.  GAAP  performance  measures  do
not have standardized meanings prescribed by U.S. GAAP, they may not be comparable to similar measures presented
by  other  companies.  These  measures  should  not  be  considered  in  isolation  or  as  substitutes  for  measures  of
performance  prepared  in  accordance  with  U.S.  GAAP.  There  are  limitations  associated  with  the  use  of  such  non-U.S.
GAAP measures. Since these measures do not incorporate revenues, changes in working capital and non-operating cash
costs, they are not necessarily indicative of potential operating profit or loss, or cash flow from operations as determined
in accordance with U.S. GAAP.

The non-U.S. GAAP measures associated with Cash Costs, All-in Sustaining Costs (“AISC”) and resulting per ounce and
per tonne processed metrics are  not,  and  are  not  intended  to  be,  presentations  in  accordance  with  U.S.  GAAP.  These
metrics represent costs and unit-cost measures related to the Project.

We believe that these metrics help investors understand the economics of the Project. We present the non-U.S. GAAP
financial measures for our Project in the tables below. Actual U.S. GAAP results may vary from the amounts disclosed in
this report. Other companies may calculate these measures differently.

57

Table of Contents

Cash Costs, AISC and Respective Unit Cost Measures

Cash  Costs  and  AISC,  and  respective  unit  cost  measures,  are  non-U.S.  GAAP  metrics  developed  by  the  World  Gold
Council to provide transparency into the costs associated with producing gold and provide a comparable standard. The
Company  reports  Cash  Costs  and  AISC  on  a  per  ounce  and  per  tonne  processed  basis  because  we  believe  these
metrics more completely reflect mining costs over specified periods and the life of mine. Similar metrics are widely used in
the gold mining industry as comparative benchmarks of performance.

Cash Costs consist of Project operating costs, refining costs, and the Jawoyn royalty. The sum of these costs is divided
by  the  corresponding  payable  gold  ounces  or  tonnes  processed  to  determine  Cash  Cost  per  ounce  or  per  tonne
processed metrics, respectively.

AISC consists of Cash Costs (as described above), plus sustaining capital costs. The sum of these costs is divided by the
corresponding payable gold ounces or tonnes processed to determine AISC per ounce or per tonne processed metrics,
respectively.

Other  costs  excluded  from  Cash  Costs,  and  AISC  include  depreciation  and  amortization,  income  taxes,  government
royalties, financing charges, costs related to business combinations, asset acquisitions other than sustaining capital, and
asset dispositions.

The following tables demonstrate the calculation of Cash Costs, AISC, and the respective unit-cost metrics for amounts
presented in this report.

Payable Gold
Operating Costs
Refining Cost
Royalties
Cash Costs
Cash Cost per ounce

Sustaining Capital
All-In-Sustaining Costs
AISC per ounce

Payable Gold
Tonnes processed

Mining Costs
Processing Costs
Site General and Administrative Costs
Water Treatment
Tailings Management
Refining Cost
Jawoyn Royalty
Cash Costs

Units

koz
US$000s
US$000s
US$000s
US$000s
US$/oz

US$000s
US$000s
US$/oz

Years 1-7(1)

Life of Mine
(16 years)

3,353
2,401,667
11,564
107,292
2,520,523
$752

363,456
2,883,980
$860

6,313
4,935,717
21,943
202,032
5,159,692
$817

700,205
5,859,897
$928

Units

Years 1-7(1)

Life of Mine
(16 years)

koz
kt

US$000s
US$000s
US$000s
US$000s
US$000s
US$000s
US$000s
US$000s

3,353
124,298

6,313
280,375

 $  1,059,410 
1,166,536
131,411
32,887
11,423
11,564
107,292
 $  2,520,523 

 $  1,903,807 
2,647,563
278,015
82,692
23,640
21,943
202,032
 $  5,159,692 

58

Table of Contents

Per Payable Ounce:

Mining Cost per ounce
Processing Cost per ounce
Site General and Administrative Costs per ounce
Water Treatment per ounce
Tailings Management per ounce
Refining Cost per ounce
Jawoyn Royalty per ounce
Cash Cost per ounce

$/oz
$/oz
$/oz
$/oz
$/oz
$/oz
$/oz
$/oz

Per Tonne Processed:

Mining Cost per tonne processed
Processing Cost per tonne processed
Site General and Administrative Costs per tonne processed
Water Treatment per tonne processed
Tailings Management per tonne processed
Refining Cost per tonne processed
Jawoyn Royalty per tonne processed
Cash Cost per tonne processed

$/tonne
$/tonne
$/tonne
$/tonne
$/tonne
$/tonne
$/tonne
$/tonne

(1)Years 1-7 start after the 6-month commissioning and ramp up period.

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA.

Management’s Report on Internal Control Over Financial Reporting

$315.97
          348.23 
            39.19 
              9.81 
              3.10 
              3.45 
            32.00 
$751.75

$8.52
              9.39 
              1.06 
              0.26 
              0.08 
              0.09 
              0.86 
$20.28

$301.55
          419.35 
            44.04 
            13.10 
              3.74 
              3.48 
            32.00 
$817.25

$6.79
              9.44 
              0.99 
              0.29 
              0.08 
              0.08 
              0.72 
$18.40

The  management  of  Vista  Gold  Corp.  and  its  subsidiaries  (collectively,  “Vista,”  the  “Company,”  “we,”  “our,”  or  “us”)  is
responsible  for  establishing  and  maintaining  adequate  internal  control  over  financial  reporting.  Internal  control  over
financial reporting is a process designed by, or under the supervision of, the Company’s principal executive and principal
financial officers and effected by the Company’s board of directors (the “Board”), management and other personnel, to
provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external  purposes  in  accordance  with  generally  accepted  accounting  principles.  Because  of  its  inherent  limitations,
internal  control  over  financial  reporting  may  not  prevent  or  detect  misstatements.  Also,  projections  of  any  evaluation  of
effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions,
or that the degree of compliance with the policies or procedures may deteriorate.

The  Company’s  management  assessed  the  effectiveness  of  the  Company’s  internal  control  over  financial  reporting  at
December  31,  2021.  In  making  this  assessment,  the  Company’s  management  used  the  criteria  set  forth  by  the
Committee  of  Sponsoring  Organizations  of  the  Treadway  Commission  Internal  Control-Integrated  Framework  in  2013.
Based  upon  its  assessment,  management  concluded  that,  at  December  31,  2021,  the  Company’s  internal  control  over
financial reporting was effective.

59

Table of Contents

Report of Independent Registered Public Accounting Firm

To the Stockholders and Board of Directors of Vista Gold Corp.

Opinion on the Financial Statements

We have audited the accompanying consolidated balance sheets of Vista Gold Corp. (the “Company”) as of December
31, 2021 and 2020, the related consolidated statements of income/(loss), stockholders' equity, and cash flows for each of
the years in the two-year period ended December 31, 2021, and the related notes (collectively referred to as the “financial
statements”). In our opinion, the financial statements referred to above present fairly, in all material respects, the financial
position of the Company as of December 31, 2021 and 2020, and the results of its operations and its cash flows for each
of  the  years  in  the  two-year  period  ended  December  31,  2021,  in  conformity  with  accounting  principles  generally
accepted in the United States of America.

Basis for Opinion

The Company's management is responsible for these financial statements. Our responsibility is to express an opinion on
the  Company’s  financial  statements  based  on  our  audits.  We  are  a  public  accounting  firm  registered  with  the  Public
Company Accounting Oversight Board (United States) (“PCAOB”) and are required to be independent with respect to the
Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities
and Exchange Commission and the PCAOB.

We  conducted  our  audits  in  accordance  with  the  standards  of  the  PCAOB.  Those  standards  require  that  we  plan  and
perform  the  audit  to  obtain  reasonable  assurance  about  whether  the  financial  statements  are  free  of  material
misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an
audit of its internal control over financial reporting. As part of our audits, we are required to obtain an understanding of
internal  control  over  financial  reporting  but  not  for  the  purpose  of  expressing  an  opinion  on  the  effectiveness  of  the
Company's internal control over financial reporting. Accordingly, we express no such opinion.

Our  audits  included  performing  procedures  to  assess  the  risks  of  material  misstatement  of  the  financial  statements,
whether  due  to  error  or  fraud,  and  performing  procedures  that  respond  to  those  risks.  Such  procedures  included
examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also
included evaluating the accounting principles used and significant estimates made by management, as well as evaluating
the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matter

The critical audit matter communicated below is a matter arising from the current period audit of the financial statements
that  was  communicated  or  required  to  be  communicated  to  the  audit  committee  and  that  (1)  relates  to  accounts  or
disclosures  that  are  material  to  the  financial  statements  and  (2)  involved  our  especially  challenging,  subjective,  or
complex  judgments.  The  communication  of  critical  audit  matters  does  not  alter  in  any  way  our  opinion  on  the  financial
statements,  taken  as  a  whole,  and  we  are  not,  by  communicating  the  critical  audit  matter  below,  providing  a  separate
opinion on the critical audit matter or on the accounts or disclosures to which it relates.

Critical Audit Matter Description

Impairment Assessment over Used Mill Equipment – Refer to Notes 5 and 8 to the financial statements.

During the year ended December 31, 2021, the Company reduced the carrying amount of the used mill equipment to $nil
to reflect management’s estimate of recoverability. This estimate reflects management’s consideration of the duration this
equipment has been actively marketed by an independent broker and the current competitive market conditions for used
equipment yielding no sales.

60

Table of Contents

We  identified  the  Company’s  impairment  charge  for  its  used  mill  equipment  as  a  critical  audit  matter.  The  principal
considerations  for  our  determination  include  the  high  degree  of  subjectivity  associated  with  the  significant  assumption
included in management's impairment assessment and management not having the ability to estimate recoverable sales
proceeds with sufficient certainty. The significant assumption is the Company’s ability to sell the used mill equipment in
the current market environment.

How the Critical Audit Matter was Addressed in the Audit

Our audit procedures performed to address this critical audit matter included the following, among others:

• We gained an understanding of the Company’s internal controls over management’s impairment assessment

of its used mill equipment.

• We evaluated management’s impairment analysis.
• We evaluated the significant assumption used to estimate fair value.

/s/ PLANTE & MORAN, PLLC

We have served as the Company’s auditor since 2014.

Denver, Colorado

February 24, 2022

61

Table of Contents

VISTA GOLD CORP.
CONSOLIDATED BALANCE SHEETS
(Dollar amounts in U.S. dollars and in thousands, except shares)

Assets:
Current assets:
Cash and cash equivalents
Short-term investments (Note 3)
Other investments, at fair value (Note 3)
Other current assets
Total current assets

Non-current assets:
Mineral properties (Note 4)
Plant and equipment, net (Note 5)
Right-of-use assets

Total non-current assets

Total assets

Liabilities and Shareholders’ Equity:
Current liabilities:
Accounts payable
Accrued liabilities and other
Deferred option gain (Note 4)

Total current liabilities

Non-current liabilities:
Provision for environmental liability (Note 12)
Other liabilities

Total non-current liabilities

Total liabilities

Commitments and contingencies (Note 7)

December 31,  December 31, 

2021

2020

$

$

$

$

$

$

12,757
384
—
811
13,952

2,146
233
12
2,391
16,343

566
839
383
1,788

240
21
261
2,049

7,762
400
293
952
9,407

2,146
5,643
34
7,823
17,230

356
702
68
1,126

240
13
253
1,379

Shareholders’ equity:
Common shares,  no par value - unlimited shares authorized; shares outstanding: 
2021 - 117,189,232 and 2020 -  103,171,904 (Note 6)
Accumulated deficit

Total shareholders’ equity

Total liabilities and shareholders’ equity

474,181
(459,887)
14,294
16,343

$

460,501
(444,650)
15,851
17,230

$

Approved by the Board of Directors

/s/ Tracy A. Stevenson
Tracy A. Stevenson
Director

/s/ John M. Clark
John M. Clark
Director

The accompanying notes are an integral part of these consolidated financial statements.

62

    
    
 
Table of Contents

VISTA GOLD CORP.
CONSOLIDATED STATEMENTS OF INCOME/(LOSS)
(Dollar amounts in U.S. dollars and in thousands, except shares and per share data)

Operating income/(expense):
Gain on disposal of mineral property interests, net (Note 4)
Exploration, property evaluation and holding costs
Corporate administration
Depreciation and amortization
Write-down of plant and equipment (Note 5)

Total operating expense

Non-operating income:
Gain on other investments (Note 3)
Interest income
Other income

Total non-operating income

Income/(loss) before income taxes
Net income/(loss)

Basic:
Weighted average number of shares outstanding
Net income/(loss) per share

Diluted:
Weighted average number of shares outstanding
Net income/(loss) per share

Year Ended December 31, 

2021

2020

2,100
(7,942)
(3,945)
(49)
(5,500)
(15,336)

46
3
50
99

(15,237)
(15,237)

110,263,237
(0.14)

110,263,237
(0.14)

$

$

$

$

6,108
(4,545)
(3,777)
(48)
—
(2,262)

2,405
16
261
2,682

420
420

101,814,139
0.00

104,478,920
0.00

$

$

$

$

The accompanying notes are an integral part of these consolidated financial statements.

63

    
    
    
Table of Contents

VISTA GOLD CORP.
CONSOLIDATED STATEMENTS OF SHAREHOLDERS’ EQUITY
(Dollar amounts in U.S. dollars and in thousands, except shares)

Balances at January 1, 2020
Shares issued, net of offering costs (Note 6)
Shares issued (RSUs vested, net of shares withheld) 
(Note 6)
Shares issued (exercise of stock options) (Note 6)
Stock-based compensation (Note 6)
Net income
Balances at December 31, 2020

Common
Shares
100,698,124
2,028,334

395,446
50,000
—
—
103,171,904

(124)
37
913
—
$ 460,501

     Amount

$ 457,716
1,959

Accumulated
Deficit
(445,070)
—

$

Balances at January 1, 2021
Shares issued, net of offering costs (Note 6)
Shares issued (RSUs vested, net of shares withheld) 
(Note 6)
Stock-based compensation (Note 6)
Net loss
Balances at December 31, 2021

103,171,904
13,071,000

$ 460,501
13,194

946,328
—
—
117,189,232

(401)
887
—
$ 474,181

The accompanying notes are an integral part of these consolidated financial statements.

64

Total
Shareholders’
Equity

$

$

$

$

12,646
1,959

(124)
37
913
420
15,851

15,851
13,194

(401)
887
(15,237)
14,294

—
—
—
420
(444,650)

(444,650)
—

—
—
(15,237)
(459,887)

$

$

$

    
    
Table of Contents

VISTA GOLD CORP.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Dollar amounts in U.S. dollars and in thousands)

Cash flows from operating activities:

Net income/(loss)

Adjustments to reconcile net income/(loss) to net cash used in operations:

Year Ended December 31, 

2021

2020

$

(15,237)

$

420

Depreciation and amortization
Stock-based compensation
Gain on disposal of mineral property interests, net
Write-down of plant and equipment
Gain on other investments

Change in working capital account items:

Other current assets
Accounts payable, accrued liabilities and other

Net cash used in operating activities
Cash flows from investing activities:

Proceeds from sales of marketable securities
Disposition of short-term investments, net
Additions to plant and equipment
Proceeds from option/sale agreements, net

Net cash provided by investing activities
Cash flows from financing activities:

Proceeds from equity financing, net
Payment of taxes from withheld shares
Proceeds from exercise of stock options

Net cash provided by financing activities

Net increase in cash and cash equivalents
Cash and cash equivalents, beginning of period
Cash and cash equivalents, end of period

Supplemental cash flow information (Note 9)

49
887
(2,100)
5,500
(46)

(50)
377
(10,620)

339
16
(139)
2,415
2,631

13,385
(401)
—
12,984

4,995
7,762
12,757

$

48
913
(6,108)
—
(2,405)

(279)
456
(6,955)

5,788
2,860
(68)
3,048
11,628

1,768
(124)
37
1,681

6,354
1,408
7,762

$

The accompanying notes are an integral part of these consolidated financial statements.

65

    
    
Table of Contents

VISTA GOLD CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Dollar amounts in U.S. dollars and in thousands, except share-related amounts)

1. Nature of Operations

Vista Gold Corp. and its subsidiaries (collectively, “Vista,” the “Company,” “we,” “our,” or “us”) operate in the gold mining
industry.  We  are  focused  on  evaluation,  acquisition,  exploration  and  advancement  of  gold  exploration  and  potential
development  projects,  which  may  lead  to  gold  production  or  value  adding  strategic  transactions  such  as  earn-in  right
agreements,  option  agreements,  leases  to  third  parties,  joint  venture  arrangements  with  other  mining  companies,  or
outright  sales  of  assets  for  cash  and/or  other  consideration.  We  look  for  opportunities  to  improve  the  value  of  our  gold
projects through exploration drilling and/or technical studies focused on optimizing previous engineering work. We do not
currently generate cash flows from mining operations.

The Company’s flagship asset is its  100% owned Mt Todd gold project (“Mt Todd” or the “Project”) in Northern Territory,
Australia. Mt Todd is the largest undeveloped gold project in Australia. With the approval of the Mining Management Plan
in June 2021, all major operating and environmental permits for Mt Todd have been received. Since acquiring Mt Todd in
2006, we have invested substantial financial resources to systematically explore, evaluate, engineer, permit and de-risk
the  Project.  In  February  2022,  we  completed  a  feasibility  study  for  Mt  Todd  and  are  evaluating  a  potential  partners,
investors and lenders as we pursue a range of development alternatives.

2. Significant Accounting Policies and Estimates

Principles of Consolidation

The Consolidated Financial Statements include the accounts of Vista and its subsidiaries, all of which are more-than- 50%
owned  subsidiaries  and  under  Vista’s  control.  All  significant  intercompany  balances  and  transactions  have  been
eliminated. The Consolidated Financial Statements have been prepared in accordance with U.S. GAAP.

Use of Estimates

Preparation  of  the  Company’s  Consolidated  Financial  Statements  requires  management  to  make  estimates  and
assumptions that affect the reported amounts of assets, liabilities, income and expenses during the reporting period. The
more  significant  areas  requiring  the  use  of  management  estimates  and  assumptions  are:  asset  impairments,  the  fair
value and accounting treatment of financial instruments including warrants; useful lives of assets for asset depreciation
purposes;  valuation  allowances  for  deferred  tax  assets;  the  fair  value  and  accounting  treatment  of  stock-based
compensation;  and  the  provision  for  environmental  liabilities.  Management  based  its  estimates  on  historical  experience
and on various other assumptions that are believed to be reasonable under the circumstances. Accordingly, actual results
will likely differ from amounts estimated in these financial statements.

Cash and Cash Equivalents

Cash and cash equivalents include cash on hand and government securities with original maturities of 90 days or less
when purchased. Because of the short maturity of these investments, carrying amounts approximate their fair values.

Foreign Currency Transactions

Our  functional  currency  is  the  U.S.  dollar.  Foreign  currency  transactions  denominated  in  currency  other  than  the
functional  currency  are  recorded  at  the  approximate  rate  of  exchange  at  the  transaction  date  and  any  gains/(losses)
resulting therefrom are recorded in other expense. For each of the years ended December 31, 2021 and 2020, net foreign
currency gains/(losses) were insignificant.

66

Table of Contents

Short-term Investments

Short-term  investments  consist  of  securities  with  original  maturity  dates  greater  than  90  days  and  less  than  one  year.
These securities are typically United States or Australian government treasury bills and/or notes. Short-term investments
are  recorded  at  amortized  cost  and  are  classified  as  debt  securities  held-to-maturity  as  the  Company  has  the  intention
and ability to hold these instruments until their original maturity date at the time of purchase.

Mineral Properties

Mineral  property  acquisition  costs,  including  directly  related  costs,  are  capitalized  when  incurred,  and  mineral  property
exploration costs are expensed as incurred. Capitalized costs will be depleted using the units-of-production method over
the estimated life of the proven and probable reserves. If mineral properties are subsequently sold or abandoned, any un-
depleted costs will be charged to expense in that period.

The recoverability of the carrying values of our mineral properties is dependent upon economic reserves being discovered
or developed on the properties, permitting, financing, start-up, and commercial production from, or the sale/lease of, or
other strategic transactions related to these properties. Development and/or start-up of any of these projects will depend
on,  among  other  things,  management’s  ability  to  raise  sufficient  capital  for  these  purposes.  Proceeds  received  from
option  or  sale  agreements  are  ascribed  to  recovery  of  the  carrying  value  of  the  related  project  until  the  carrying  value
reaches  zero.  Thereafter,  any  additional  proceeds  received  are  recognized  as  a  contract  liability  (deferred  option  gain)
until control has transferred to the buyer or the related contract terminates.

We  assess  the  carrying  value  of  mineral  properties  for  impairment  whenever  information  or  circumstances  indicate  the
potential  for  impairment.  This  would  include  events  and  circumstances  such  as  our  inability  to  obtain  all  the  necessary
permits, changes in the legal status of our mineral properties, government actions, the results of exploration activities and
technical  evaluations  and  changes  in  economic  conditions,  including  the  price  of  gold  and  other  commodities  or  input
prices.  Such  evaluations  compare  estimated  future  net  cash  flows  with  our  carrying  costs  and  future  obligations  on  an
undiscounted basis. If it is determined that the estimated future undiscounted cash flows are less than the carrying value
of  the  property,  a  write-down  to  the  estimated  fair  value  will  then  be  reported  in  our  Consolidated  Statement  of
Income/(Loss) for the period. Where estimates of future net cash flows are not determinable and where other conditions
indicate the potential for impairment, management uses available market information and/or third-party valuation experts
to assess if the carrying value can be recovered and to estimate fair value.

Impairment

Carrying  values  of  long-lived  assets,  other  than  mineral  properties,  are  evaluated  for  impairment  at  such  time  that
information becomes available indicating that the carrying value may not be recoverable. If it is determined that the fair
value is less than the carrying value an impairment charge equal to the difference between the fair value and the carrying
value will be recorded in our Consolidated Statements of Income/(Loss).

Stock-Based Compensation

Under  our  stock  option,  long-term  incentive,  and  deferred  share  unit  plans,  the  Company  can  grant  stock  incentive
options,  restricted  share  units,  and  deferred  share  units  to  executives,  employees,  consultants  and  non-employee
directors  as  applicable.  Compensation  expense  for  such  grants  is  recorded  in  the  Consolidated  Statements  of
Income/(Loss) as a component of exploration, property evaluation and holding costs and corporate administration, with a
corresponding  increase  to  Common  Shares  in  the  Consolidated  Balance  Sheets.  The  fair  value  of  option  grants  is
calculated using the Black-Scholes option pricing model. The fair value of restricted and deferred share units is based on
the closing price of our Common Shares on the grant date, and in certain cases, adjusted by a Brownian motion price
model. The expense is based on the fair value of the grant on the grant date and is recognized over the vesting period
specified for each grant. Forfeitures of unvested awards for all stock-based compensation result in expense reversal upon
forfeiture.

67

Table of Contents

Financial Instruments

Accounting  Standards  Codification  Topic  820,  Fair  Value  Measurements  and  Disclosures  (“ASC  820”)  of  the  Financial
Accounting Standards Board (“FASB”) requires an entity to maximize the use of observable inputs and minimize the use
of  unobservable  inputs  when  measuring  fair  value.  ASC  820  establishes  a  fair  value  hierarchy  based  on  the  level  of
independent,  objective  evidence  surrounding  the  inputs  used  to  measure  fair  value.  A  financial  instrument’s
categorization  within  the  fair  value  hierarchy  is  based  upon  the  lowest  level  of  input  that  is  significant  to  the  fair  value
measurement. ASC 820 prioritizes the inputs into three levels that may be used to measure fair value:

●

●

●

Level 1 – Unadjusted quoted prices in active markets that are accessible at the measurement date for identical,
unrestricted assets or liabilities. 

Level 2 – Observable inputs other than quoted prices included within Level 1 that are observable for the asset or
liability,  either  directly  or  indirectly,  including  quoted  prices  for  similar  assets  and  liabilities  in  active  markets;
quoted prices for identical or similar assets and liabilities in markets that are not active; or other inputs that are
observable or can be corroborated by observable market data by correlation or other means.

Level 3 – Prices or valuation techniques requiring inputs that are both significant to the fair value measurement
and unobservable. 

Our  financial  instruments  include  cash  and  cash  equivalents,  marketable  securities,  short-term  investments,  accounts
payable and certain other current assets and liabilities. Due to the short-term nature of our cash and cash equivalents,
short-term  investments,  accounts  payable  and  certain  other  current  assets  and  liabilities,  we  believe  that  their  carrying
amounts approximate fair value. Our other investments are accounted for at fair value based on quoted market prices in
an active market and are included in Level 1 of the fair value hierarchy.

Recent Accounting Pronouncements

Government Assistance

In  November  2021,  the  FASB  issued  ASU  No.  2021-10  Government  Assistance  (Topic  832)  Disclosures  by  Business
Entities  About  Government  Assistance,  which  requires  additional  footnote  disclosure  around  material  government
assistance  received  by  the  entity.  Disclosure  includes  the  nature  and  amount  of  government  assistance,  commitments
made  by  the  Company,  and  significant  components  of  the  terms  and  conditions  of  the  assistance.  The  Company  is
evaluating  the  impact  of  this  pronouncement  on  its  annual  financial  statements.  The  standard  will  be  effective  for  the
Company starting on January 1, 2022. Because the standard only affects footnote disclosure, it is not expected to result
in a material effect on the financial statements.

3. Other Investments

Short-term investments

As  of  December  31,  2021  and  2020,  the  amortized  cost  basis  of  our  short-term  investments  was  $ 384  and  $400,
respectively. The amortized cost basis approximates fair value at December 31, 2021 and 2020. Short-term investments
at December 31, 2021 and 2020 are comprised of Australian or U.S. Government instruments, all of which have maturity
dates greater than 90 days but less than one year.

Other investments

The  Company  held  1,333,334  shares  of  Nusantara  Resources  Limited  (“Nusantara  Resources”)  as  of  December  31,
2020. On September 22, 2021, the shareholders of Nusantara Resources approved a scheme of arrangement whereby
PT Indika Mineral Investindo (“Indika”) offered to acquire all issued shares of Nusantara Resources for A$0.35 per share.
The  transaction  closed  on  October  6,  2021,  resulting  in  Vista  receiving  $339  upon  tendering  its  Nusantara  Resources
shares.

68

Table of Contents

Investments in marketable securities are recorded at fair value in the Consolidated Balance Sheets. Subsequent changes
in fair value are recorded in the Consolidated Statements of Income/(Loss) in the period in which they occur. During the
year ended December 31, 2020, the Company sold its common shares of Midas Gold Corp. (“Midas Gold Shares”) for net
proceeds of $5,788 at a gain of $ 2,574 compared to the most recent measurement period. Cumulative realized loss since
acquisition of these Midas Gold Shares in April 2011 was $11,841, of which $ 14,415 was recognized in previous periods
as unrealized loss, net.

The following table summarizes our investments in marketable securities as of December 31, 2021 and 2020.

Fair value at beginning of period
Midas Gold Shares sold
Nusantara Resources shares sold
Realized gain
Fair value at end of period

4. Mineral Properties

Mt Todd, Northern Territory, Australia

Capitalized mineral property values were:

Mt Todd, Australia

Guadalupe de los Reyes, Sinaloa, Mexico

$

$

     December 31, 2021      December 31, 2020
3,676
(5,788)
—
2,405
293

293
—
(339)
46
— $

$

     At December 31, 2020      At December 31, 2019
2,146

2,146

$

$

In July 2020, the Company received the final $ 1,500 payment from Prime Mining Corporation (“Prime Mining”) for sale of
the Guadalupe de los Reyes gold and silver project in Sinaloa, Mexico (“Los Reyes”). Upon receipt of final payment and
transfer of the Los Reyes project to Prime Mining during the three months ended September 30, 2020, Vista recognized
an operating gain of $3,540, inclusive of previously deferred option gain of $ 2,892 and net of associated closing costs. As
part of the terms of sale, Prime Mining was required to make additional payments to Vista of $2,100 in lieu of Vista being
granted certain royalty and back-in rights. Prime Mining paid $ 1,100 in January 2021 and $ 1,000 in June 2021. Having
received these payments as scheduled,  Vista  has  no  remaining  right  to  be  granted  the  royalties  and  back-in  right,  and
Vista recognized a gain on disposal of mineral property interests of $2,100 during the year ended December 31, 2021.

Awak Mas, Sulawesi, Indonesia

Vista held a net smelter return royalty (“NSR”) on the Awak Mas project in Indonesia. During 2019, Vista and the holder
of Awak Mas, Nusantara Resources, amended the original royalty agreement to allow the holder or a nominated party to
make a $2,400 payment to Vista by April 30, 2020 to cancel a  1% NSR on the first  1,250,000 ounces produced at Awak
Mas  and  a 1.25%  NSR  on  the  next  1,250,000  ounces  produced.  On  May  5,  2020,  the  Company  received  $ 2,400  to
cancel  the  related 1%  NSR  and  1.25%  NSR.  The  gain  recognized  upon  receipt  of  this  payment  was  $ 2,568,  which
included the $2,400 payment plus $ 168 of previously deferred option gain.

The Nusantara Resources subsidiary or a nominated party also had the right to cancel the remaining  1% NSR and  1.25%
NSR for an additional payment of $2,500 by April 30, 2021. Vista and the Nusantara Resources subsidiary agreed in April
2021 to extend the payment date for the remaining $2,500 to not later than January 31, 2022 upon payment of certain
extension  fees.  Vista  received  $315  during  the  year  ended  December  31,  2021  for  extension  fees.  In  October  2021,
Nusantara  Resources  was  acquired  by  Indika,  which  became  the  holder  of  Awak  Mas.  Indika  made  the  final  $2,500
payment on January 28, 2022. In 2022, the Company will recognize a gain for this amount plus $383 that is carried as
deferred option gain as of December 31, 2021.

69

Table of Contents

5. Plant and Equipment

Mt Todd, Australia
Corporate, United States
Used mill equipment, Canada

December 31, 2021
Accumulated
     Depreciation     

Net

Cost

$

$

5,359
333
—
5,692

$

$

5,126
333
—
5,459

$

$

233
—
—
233

$

$

Cost

5,306
333
5,500
11,139

December 31, 2020
Accumulated
     Depreciation     

$

$

5,163
333
—
5,496

$

$

Net

143
—
5,500
5,643

During the year ended December 31, 2021, the Company reduced the carrying value of the used mill equipment to  $nil to
reflect management’s estimate of recoverability. The Company recorded this reduction as an operating loss of  $5,500 in
our  Consolidated  Statements  of  Income/(Loss).  The  inputs  used  in  the  valuing  the  used  mill  equipment  included  the
duration  this  equipment  has  been  actively  marketed  by  an  independent  broker  and  the  current  competitive  market
conditions for used equipment yielding  no  sales.  These  inputs  used  in  valuing  the  used  mill  equipment  involved  a  high
degree  of  subjectivity  and  resulted  in  management  not  having  the  ability  to  estimate  recoverable  sales  proceeds  with
sufficient certainty. The used mill equipment continues to be marketed by the independent broker.

6. Common Shares

Equity Financing

During July 2021, we closed a public offering of  12,272,730  units  (the  “Units”)  for  net  proceeds  of  $12,323  (the  “2021
Offering”). The stock issuance costs associated with the 2021 Offering were $1,177. Each Unit consisted of  one common
share  of  the  Company  (each  a  “Common  Share”)  and one-half  of  one   Common  Share  purchase  warrant  (each  full
warrant,  a  “Warrant”).  A  total  of 7,408,101  Warrants  were  issued,  including  920,454  Warrants  purchased  by  the
underwriters  pursuant  to  an  overallotment  option  and 351,282  broker  Warrants  issued  to  the  underwriters  as
compensation. Each Warrant entitles the holder thereof to purchase one Common Share at a price of  $1.25 per Common
Share (subject to adjustment in certain circumstances) and is exercisable for a period of 36 months from the closing of
the 2021 Offering. The Warrants, which are classified as equity, had an aggregate relative fair value of $1,991 upon the
issuance thereof on the closing date. The relative fair value of Warrants was estimated at the grant date using the Black-
Scholes option pricing model using the following assumptions: 1) expected volatility of 70.6%, 2) risk-free rate of  0.43%,
3) contractual term of 3 years, and 4) stock price on the closing date of  $0.89 per Common Share. A relative fair value of
$11,509 was allocated to the Common Shares.

Vista  was  party  to  an  at-the-market  offering  agreement  (the  “ATM  Agreement”)  with  H.  C.  Wainwright  &  Co.,  LLC
(“Wainwright”), under which the Company had the right, but was not obligated, to issue and sell Common Shares through
Wainwright  for  aggregate  sales  proceeds  of  up  to  $10,000  (the  “ATM  Program”).  No  securities  could  be  offered  in
Canada under the ATM Agreement. The ATM Agreement was amended in June 2020 to remain in force until terminated
by  either  party.  During  the  year  ended  December  31,  2020  the  Company  sold  2,028,334  Common  Shares  for  net
proceeds of $1,959 under the ATM Program, which included $191 that settled for cash in January 2021. During the year
ended  December  31,  2021  the  Company  sold 798,270  Common  Shares  for  net  proceeds  of  $ 871  under  the  ATM
Program. Each sale under the ATM Agreement was made pursuant to an “at the market offering” as defined in Rule 415
under  the  United  States  Securities  Act  of  1933,  as  amended.  In  July  2021,  the  ATM  Program  was  suspended  in
conjunction with the 2021 Offering.

Vista subsequently filed for and received notice of effectiveness of a new shelf registration statement in November 2021
with the Securities and Exchange Commission. In December 2021, the Company renewed the ATM Agreement on

70

    
    
  
Table of Contents

substantially  the  same  terms,  to  provide  for  aggregate  sales  proceeds  up  to  $ 10,000 (the  “2021  ATM  Program”).  The
entire $10,000 under the 2021 ATM Program remained available as of December 31, 2021.

Other Share Issuances

During the years ended December 31, 2021 and 2020 we issued  946,328 and 445,446 Common Shares, respectively, in
connection with vesting of restricted share units (“RSUs”) and/or stock option exercises.

Warrants

Warrant activity is summarized in the following table. Intrinsic value is the aggregate value of warrants that were in the
money at the end of the period. The warrants are subject to standard anti-dilution provisions.

As of December 31, 2020
Issued
As of December 31, 2021

Stock-Based Compensation

Weighted
average
exercise price

Warrants

     outstanding      per share
— $

Weighted
average
remaining life
(yrs.)

—
3.0
2.5

—
1.25
1.25

7,408,101
7,408,101

$

The  Company’s  stock-based  compensation  plans  include:  RSUs  currently  outstanding  under  the  Company’s  long-term
equity incentive plan (“LTIP”), deferred share units (“DSUs”) issuable pursuant to the Company’s deferred share unit plan
(“DSU  Plan”)  and  stock  options  (“Stock  Options”)  issuable  under  the  Company’s  stock  option  plan  (the  “Plan”).  Stock-
based  compensation  may  be  issued  to  our  directors,  officers,  employees  and  consultants.  The  maximum  number  of
Common Shares that may be reserved for issuance under the combined stock-based compensation plans is a variable
number equal to 10% of the issued and outstanding Common Shares on a non-diluted basis at any one time. Vista also
issued phantom units in 2018 to be settled in cash over a three-year term. Stock-based compensation and phantom units
may be granted from time to time at the discretion of the Board of Directors of the Company (the “Board”), with vesting
provisions as determined by the Board.

Stock-based compensation expense for the years ended December 31, 2021 and 2020 was:

RSUs
DSUs
Stock Options

Phantom units

Year Ended December 31, 

2021

2020

$

$

$

672
212
3
887

26

$

$

$

643
209
61
913

98

As of December 31, 2021, unrecognized compensation expense for RSUs was  $312, which is expected to be recognized
over a weighted average period of 1.2 years. 

71

    
  
         
    
       
Table of Contents

Restricted Share Units

The following table summarizes RSU activity:

Unvested - December 31, 2019
Granted
Cancelled/forfeited
Vested, net of shares withheld
Unvested - December 31, 2020
Granted
Cancelled/forfeited
Vested, net of shares withheld
Unvested - December 31, 2021

Number
     of RSUs

Weighted Average
Grant-Date Fair
     Value Per RSU

1,491,301     $
1,609,000
(237,853)
(395,446)

2,467,002     $

891,000
(413,335)
(946,328)
1,998,339

$

0.51   
0.41
0.60
0.63
0.42   
0.76
0.48
0.46
0.53

During the years ended December 31, 2021 and 2020, the Company withheld shares equivalent to the value of employee
withholding  tax  obligations  which  resulted  from  RSUs  vesting  in  the  period.  Shares  withheld  are  considered
cancelled/forfeited.

Under the LTIP, a portion of the RSU awards vest on a fixed future date providing the recipient continues to be affiliated
with  Vista  on  that  date.  Other  RSU  awards  vest  subject  to  achievement  of  certain  performance  and  market  criteria,
including  the  accomplishment  of  certain  corporate  objectives  and  the  Company’s  share  price  performance.  Of  the
unvested RSUs, approximately 35% will vest based on fixed future dates, and approximately  11% and 54% will vest on
performance and share-price criteria, respectively. The minimum vesting period for RSUs is one year.

Deferred Share Units

The DSU Plan provides for granting of DSUs to non-employee directors. DSUs vest immediately; however, the Company
will  issue one  Common  Share  for  each  DSU  only  after  the  non-employee  director  ceases  to  be  a  director  of  the
Company. In February 2021, the Board granted 204,000 DSUs and the Company recognized $ 212 of DSU expense. In
March 2020, the Board granted 360,000 DSUs and the Company recognized $ 209 of DSU expense.

The following table summarizes DSU activity:

Unvested - December 31, 2019
Granted
Outstanding - December 31, 2020
Granted
Outstanding - December 31, 2021

72

Number of
DSUs

Weighted Average
Grant-Date Fair
Value per DSU  

366,000
360,000
726,000
204,000
930,000

$

$

$

0.57
0.58
0.57
1.04
0.68

    
    
Table of Contents

Stock Options

The following table summarizes option activity:

Number of
Options

Weighted Average
Exercise Price
Per Option

Outstanding - December 31, 2019
Granted
Exercised
Cancelled/Forfeited
Outstanding - December 31, 2020
Outstanding - December 31, 2021

1,437,000      $
50,000
(50,000)
(70,000)
1,367,000      $
1,367,000
$

Exercisable - December 31, 2021

1,367,000

$

The following table summarizes unvested option activity:

0.73
0.51
0.75
1.02
0.71
0.71

0.71

Weighted Average
Remaining
Contractual Term
(Years)

3.49

$

Aggregate
Intrinsic
Value

2.63
1.64

1.64

$
$

$

Weighted
Average
Grant-Date
Fair Value

Number of

35

9
—
507
38

38

Weighted
Average
Remaining
Amortization
Period
(Years)

0.61

0.25

—

Unvested - December 31, 2019
Granted
Vested
Unvested - December 31, 2020
Vested
Unvested - December 31, 2021

     Options      Per Option     
$

514,004
50,000
(530,671)
33,333
(33,333)

$

— $

0.40
0.20
0.38
0.31
0.31
—

The  fair  value  of  stock  options  granted  during  the  year  ended  December  31,  2020  to  employees,  directors  and
consultants was estimated at the grant date using the Black-Scholes option pricing model using the following weighted-
average assumptions:

Expected volatility
Risk-free interest rate
Expected life (years)
Dividend yield
Forfeiture assumption

2020
64.1 %  
0.3 %  
2.6

0 %  
0 %  

Option pricing models require the input of highly subjective assumptions, including the expected price volatility. Expected
price  volatility  is  based  on  the  historical  volatility  of  our  Common  Shares.  Changes  in  the  subjective  input  assumptions
can materially affect the fair value estimate. The expected term of the options granted represents the period of time that
the options granted are expected to be outstanding using the simplified approach. The risk-free rate for the periods within
the contractual term of the option is based on the U.S. Treasury yield curve in effect at the date of grant.

Phantom Units

The  value  of  each  phantom  unit  is  equal  to  the  Company’s  share  price  on  the  vesting  date  and  is  payable  in  cash.
Phantom units vest on fixed future dates provided the recipient continues to be affiliated with Vista on those dates. The
Company accounts for these units as awards classified as liabilities with $39 included in current liabilities as of December
31, 2020. The Company recognized $26 and $98 of compensation expense for these units in the years ended December
31, 2021 and

73

    
    
    
    
 
  
    
Table of Contents

2020, respectively. The Company paid  $65 for phantom units which vested during the year ended December 31, 2021.
The Company paid $86 for phantom units which vested during the year ended December 31, 2020.

A summary of unvested phantom units is set forth in the following table:

Unvested - December 31, 2019
Vested
Unvested - December 31, 2020
Vested
Unvested - December 31, 2021

Weighted Average Common Shares

Basic Common Shares
Effect of dilutive stock-based awards
Diluted Common Shares

Number of
     Phantom Units     
144,000     
(72,000)
72,000
(72,000)
—

Weighted Average
Remaining
Vesting Term
(Years)

1.0

0.5

—

At December 31,

2021
110,263,237
—
110,263,237

2020
101,814,139
2,664,781
104,478,920

Unvested  RSUs  representing 1,998,339  Common  Shares,  stock  options  to  purchase  1,367,000  Common  Shares,
warrants  to  purchase 7,408,101  Common  Shares,  and  vested  DSUs  representing  930,000  unissued  Common  Shares
were outstanding at December 31, 2021 but were not included in the computation of diluted weighted average Common
Shares outstanding because their effect would have been anti-dilutive.

Stock options to purchase 50,000 Common Shares were outstanding at December 31, 2020 but were not included in the
computation of diluted weighted average Common Shares outstanding because their effect would have been anti-dilutive.
The effect of dilutive stock-based awards was calculated using the treasury stock method, based on the remaining RSUs,
DSUs, and stock options outstanding as of December 31, 2020.

7. Commitments and Contingencies

Our  exploration  and  development  activities  are  subject  to  various  laws  and  regulations  governing  the  protection  of  the
environment. These laws and regulations are continually changing and are generally becoming more restrictive. As such,
future  expenditures  that  may  be  required  for  compliance  with  these  laws  and  regulations  cannot  be  predicted.  We
conduct our operations in a manner to minimize effects on the environment and believe our operations are in compliance
with applicable laws and regulations in all material respects.

The  Mt  Todd  site  was  not  reclaimed  by  the  predecessor  owners  when  the  mine  closed  in  2000.  Liability  for  the
reclamation of the environmental conditions at Mt Todd existing prior to the 2006 commencement of Vista’s involvement
with the Project is presently the responsibility of the NT Government. After we provide notice to the NT Government that
we intend to proceed with development the Company will then assume these historical rehabilitation liabilities  currently
estimated by the NT Government at approximately A$73 million.

In November 2020, we modified our agreement with the Jawoyn Association Aboriginal Corporation (the “Jawoyn”) with
respect  to  the  Project.  The  modified  agreement  provides  the  Jawoyn  with  a  gross  proceeds  royalty  (“GPR”)  ranging
between 0.125% and  2.0%, depending on prevailing gold prices and foreign exchange rates, instead of its previous right
to  become  a 10%  participating  joint  venture  partner  in  Mt  Todd.  The  modified  agreement  did  not  affect  the  previously
agreed 1.0% GPR. The combined GPR range is now from  1.125% to  3.0%.

74

 
    
    
Table of Contents

8. Fair Value Accounting

The following table sets forth the Company’s assets measured at fair value by level within the fair value hierarchy. As
required by accounting guidance, assets are classified in their entirety based on the lowest level of input that is significant
to the fair value measurement.

Fair Value at December 31, 2021
Level 1

Level 3

Total

Other investments
Used mill equipment (non-recurring)

Other investments

$
$

— $
— $

— $
— $

—
—

Fair Value at December 31, 2020

Total

$

293

     Level 1
293

$

Level 3

$

—

Our  marketable  securities  and  investment  Nusantara  Resources  shares  were  classified  as  Level  1  of  the  fair  value
hierarchy  as  they  are  valued  at  quoted  market  prices  in  an  active  market.  Marketable  securities  are  included  in  Other
Investments on the Consolidated Balance Sheets for each period presented.

The used mill equipment was classified as Level 3 of the fair value hierarchy. The management estimate of fair value at
December 31, 2021 was $nil using a market approach. See Note 5 regarding inputs used for the Level 3 valuation of the
used mill equipment.

There were no material transfers between levels nor were there any changes in valuation methods in 2021.

9. Supplemental Cash Flow Information and Material Non-Cash Transactions

As of December 31, 2021 and 2020, all of our cash was held in liquid bank deposits and/or government instruments in the
United States or Australia.

There were no significant non-cash transactions for the years ended December 31, 2021 and 2020.

10. Income Taxes

The Company’s U.S. and foreign source income/(loss) were:

U.S.
Canada
Other foreign, net

Years Ended December 31,

2021

2020

$

(136)
(7,155)
(7,946)
$ (15,237)

$

$

1,879
(308)
(1,151)
420

During  the  years  ended  December  31,  2021  and  2020,  the  Company  recognized  $nil  current  and  deferred  income  tax
expense  or  benefit  in  each  of  the  U.S.,  Canada,  and  other  foreign  jurisdictions,  due  to  full  valuation  allowances  within
each jurisdiction.

75

    
    
    
    
    
    
    
Table of Contents

Rate Reconciliation

Reconciliations  between  the  Company’s  combined  income  taxes  at  statutory  rates  and  the  U.S.  effective  income  tax
(benefit)/expense were:

Income taxed at statutory rates
Increase (decrease) in taxes from:

State Tax
Stock-based compensation
Imputed interest
Other adjustments
Mining concessions disposition
Inflation adjustment
Prior year provision to actual adjustments
Change in U.S. tax rate
Change in foreign tax rate
Differentials in foreign tax rates
Changes in foreign exchange rates
Changes in valuation allowances affecting income tax expense or benefit

Years Ended December 31,
2021

2020

$

(3,743)

$

36

(21)
33
1
—
—
(2)
(493)
—
—
(186)
911
3,500

66
50
9
(1)
853
(254)
885
29
100
(52)
(1,236)
(485)
—

Income tax (benefit)/expense

$

— $

Income  tax  benefit  of  $ 326  relating  to  deductible  share  offering  costs  were  recorded  directly  in  equity,  offset  by  a
corresponding valuation allowance.

Deferred Taxes

Deferred  income  taxes  reflect  the  net  effects  of  temporary  differences  between  the  carrying  amounts  of  assets  and
liabilities for financial reporting purposes and the amounts used for income tax purposes. Components of the Company’s
deferred tax assets and liabilities were:

December 31,

2021

2020

Deferred income tax assets
Excess tax basis over book basis of property, plant and equipment
Marketable securities
Operating loss carryforwards
Capital loss carryforwards
Capital expenditures
Stock compensation
VAT recoverable
Unrealized foreign exchange gain/loss
Environmental liability
Offering costs
Accrued vacation
Other
Total future tax assets
Valuation allowance for future tax assets

Deferred income tax liabilities
Other investments

$

$

7,225
103
40,620
14,065
374
179
145
116
65
305
26
4
63,227
(63,227)
—

—
—

Total Deferred Taxes

$

— $

76

7,776
—
36,965
13,778
374
164
150
117
65
46
22
5
59,462
(59,401)
61

61
61

—

    
    
    
    
Table of Contents

Valuation Allowance on Canadian and Foreign Tax Assets

We establish a valuation allowance against income tax assets if, based on available information, it is more likely than not
that all of the assets will not be realized. The valuation allowances of $63,227 and $59,401 at December 31, 2021 and
2020,  respectively,  related  mainly  to  operating  loss  carryforwards  where  utilization  is  not  more  likely  than  not.  The
Company periodically assesses both positive and negative evidence to determine whether it is more likely than not that
deferred tax assets can be realized prior to expiration.

Loss Carryforwards

The Company’s tax loss carryforwards expire as follows:

2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041

Noncapital

Canada     

U.S.

     Mexico

     Barbados     

Total

—
—
—
—
—
1,027
847
5,245
4,022
5,032
3,806
6,397
6,185
4,420
3,729
2,799
1,916
2,666
3,338
2,829
5,370
59,628

$

—
—
—
—
—
—
—
—
—
1,748
3,407
2,323
3,098
—
2
2,655
2,482
—
—
—
—
15,715

—
1,602
373
—
80
822
—
—
—
—
72
—
—
—
—
—
—
—
—
—
—
2,949

$

$

$

4
6
6
6
6
5
7
7
—
—
—
—
—
—
—
—
—
—
—
—
—
47

$

4
1,608
379
6
86
1,854
854
5,252
4,022
6,780
7,285
8,720
9,283
4,420
3,731
5,454
4,398
2,666
3,338
2,829
5,370
78,339

U.S. loss carryforwards for tax years beginning in 2018 through 2021 of $ 2,686, Canadian capital loss carryforwards of
$104,184 and Australian NOLs of $ 63,795, which do not expire, are not included in the previous table.

Accounting for uncertainty in taxes

Accounting Standards Codification Topic 740 (“ASC 740”) requires the Company to evaluate its income tax positions and
recognize a liability for uncertain tax positions that are not more likely than not to be sustained by tax authorities. As of
December  31,  2021  and  2020,  the  Company  believes  it  had  no  income  tax  uncertainties  that  required  recognition  of  a
liability. If the Company were to determine that uncertain tax positions meet the criteria of ASC 740, an estimated liability
and related interest and penalties would be recognized as income tax expense.

Tax statute of limitations

The  Company  files  income  tax  returns  in  Canada,  U.S.  federal  and  state  jurisdictions,  and  other  foreign  jurisdictions.
There are currently no tax examinations underway for these jurisdictions. Furthermore, the Company is no longer subject
to  Canadian  tax  examinations  by  the  Canadian  Revenue  Agency  for  years  ended  on  or  before  December  31,  2017  or
U.S.

77

    
Table of Contents

federal  income  tax  examinations  by  the  Internal  Revenue  Service  for  years  ended  on  or  before  December  31,  2017.
Some U.S. state and other foreign jurisdictions are still subject to tax examination for years ended on or before December
31, 2016.

Although certain tax years are closed under the statute of limitations, tax authorities can still adjust losses being carried
forward to open years.

11. Geographic and Segment information

The Company has  one reportable operating segment, consisting of evaluation, acquisition, and exploration activities. We
evaluate,  acquire,  explore  and  advance  gold  exploration  and  potential  development  projects,  which  may  lead  to  gold
production  or  value  adding  strategic  transactions.  These  activities  are  currently  focused  principally  in  Australia.  We
reported no revenues during the years ended December 31, 2021 or 2020. Geographic location of mineral properties and
plant and equipment is provided in Notes 4 and 5, respectively.

12. Provision for Environmental Liability

Vista maintains a $ 240 provision for potential reclamation costs attributable to certain mining claims previously held by
the Company should no other responsible or potentially responsible parties be identified.

13. Subsequent Events

The holder of Awak Mas, Indika, made the final $ 2,500 royalty cancellation payment on January 28, 2022. The Company
canceled the remaining 1% NSR and  1.25% NSR and does not have any remaining interest in Awak Mas. In 2022, the
Company will recognize a gain for the $2,500 payment plus $ 383 that is carried as deferred option gain as of December
31, 2021.

There have been no other material events subsequent to December 31, 2021.

78

Table of Contents

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTIN G AND FINANCIAL
DISCLOSURE.

None.

ITEM 9A. CONTROLS AND PROCEDURES .

Disclosure Controls and Procedures.

At the end of the period covered by this annual report on Form 10-K for the fiscal year ended December 31, 2021, an
evaluation  was  carried  out  under  the  supervision  of  and  with  the  participation  of  our  management,  including  the  Chief
Executive  Officer  (“CEO”)  and  Chief  Financial  Officer  (“CFO”),  of  the  effectiveness  of  the  design  and  operations  of  our
disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on
that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this annual report, our
disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by us in reports
that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized and reported within the
time periods specified in applicable rules and forms and (ii) material information required to be disclosed in our reports
filed  under  the  Exchange  Act  is  accumulated  and  communicated  to  our  management,  including  our  CEO  and  CFO,  as
appropriate, to allow for accurate and timely decisions regarding required disclosure.

Internal Control over Financial Reporting.

Management’s Report on Internal Control over Financial Reporting.

Management’s report on internal control over financial reporting and the attestation report on management’s assessment
are included in “Item 8 Financial Statements and Supplementary Data” herein.

Attestation Report of the Independent Registered Public Accounting Firm.

An attestation report on our internal control over financial reporting by our independent registered public accounting firm
is not included herein because, as a non-accelerated filer, we are exempt from the requirement to provide such report.

Changes in Internal Controls .

There were no changes in our internal control over financial reporting during the quarter ended December 31, 2021 that
has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

ITEM 9B. OTHER INFORMATION.

None.

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE .

PART III

Information concerning our executive officers, directors, Audit Committee, corporate governance, compliance with Section
16(a) of the Exchange Act and Code of Ethics will be contained in our definitive Proxy Statement, to be filed within 120
days after December 31, 2021 pursuant to Regulation 14A promulgated under the Securities Exchange Act of 1934, as
amended, for the 2022 Annual Meeting of Stockholders (the “Proxy Statement”) and is incorporated herein by reference.

79

Table of Contents

Code of Business Conduct and Ethics

We have a code of business conduct and ethics (the “Code of Ethics”) that applies to all of our employees, officers and
directors of the Company and its affiliated entities. The Code of Ethics is available on our website at www.vistagold.com.
We will post any amendments, waivers, and implicit waivers to the Code of Ethics on that website.

ITEM 11. EXECUTIVE COMPENSATION .

Information  relating  to  executive  compensation  will  be  contained  in  the  Proxy  Statement  and  is  incorporated  herein
by reference.

ITEM  12.  SECURITY  OWNERSHIP  OF  CERTAIN  BENEFICIAL  OWNERS  AND  MANAGEMEN T  AND  RELATED
STOCKHOLDER MATTERS.

Information relating to security ownership of certain beneficial owners of our Common Shares, our equity compensation
plans and the security ownership of our management will be contained in the Proxy Statement and is incorporated herein
by reference.

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS .

Information concerning this item will be contained in the Proxy Statement and is incorporated herein by reference.

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES .

Information concerning this item will be contained in the Proxy Statement and is incorporated herein by reference.

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES .

PART IV

Documents Filed as Part of Report

Financial Statements

The following Consolidated Financial Statements of the Company are filed as part of this report:

1. Report of Independent Registered Public Accounting Firm ( Plante & Moran, PLLC, Denver, Colorado,

PCAOB ID 166).

2. Consolidated Balance Sheets – As of December 31, 2021 and 2020.

3. Consolidated Statements of Income/(Loss) – Years ended December 31, 2021 and 2020.

4. Consolidated Statements of Shareholders’ Equity – Years ended December 31, 2021 and 2020.

5. Consolidated Statements of Cash Flows – Years ended December 31, 2021 and 2020.

6. Notes to Consolidated Financial Statements.

See “Item 8. Financial Statements and Supplementary Data”.

80

Table of Contents

Financial Statement Schedules

No  financial  statement  schedules  are  filed  as  part  of  this  report  because  such  schedules  are  not  applicable  or  the
required  information  is  shown  in  the  Consolidated  Financial  Statements  or  notes  thereto.  See  “Item  8.  Financial
Statements and Supplementary Data”.

Exhibits

The following exhibits are filed as part of this report:

Exhibit
Number

3.01

3.02

3.03

4.01
4.02

4.03

10.01*

10.02

10.03*

10.04*

10.05

10.06*

10.07*

10.08*

10.09

10.10**

10.11

10.12

Description
Certificate of Continuation, previously filed as Exhibit 3.1 to the Company’s Form 8-K dated June 12, 2013
and incorporated by reference herein (File No. 1-9025)
Notice of Articles, previously filed as Exhibit 3.2 to the Company’s Form 8-K dated June 12, 2013 and
incorporated herein by reference (File No. 1-9025)
Articles, previously filed as Exhibit 3.3 to the Company’s Form 8-K dated June 12, 2013 and incorporated
herein by reference (File No. 1-9025)
Description of Registrant’s Securities
Form of Warrant previously filed as Exhibit 4.1 to the Company’s Form 8-K dated July 9, 2021 and
incorporated herein by reference (File No. 1-9025)
Form of Underwriter’s Warrant filed as Exhibit 4.2 to the Company’s Form 8-K dated July 9, 2021 and
incorporated herein by reference (File No. 1-9025)

Amended Stock Option Plan of Vista Gold filed as Appendix F to the Company’s Proxy Statement on March
20, 2015 and incorporated herein by reference (File No. 1-9025)
Agreement, dated March 1, 2006, among the Northern Territory of Australia, Vista Gold Australia Pty. Ltd.
and Vista Gold Corp. filed as Exhibit 10.2 to the Company’s Form 8-K, dated February 28, 2006 and
incorporated herein by reference (File No. 1-9025)
Earnest Amendment Agreement dated January 1, 2016, previously filed as Exhibit 10.30 to the Company’s
Form 10-K dated February 26, 2016 and incorporated herein by reference (File No. 1-9025)
Rozelle Amendment Agreement dated January 1, 2016, previously filed as Exhibit 10.32 to the Company’s
Form 10-K dated February 26, 2016 and incorporated herein by reference (File No. 1-9025)
At-the-Market Offering Agreement dated November 22, 2017, previously filed as Exhibit 1.1 to the
Company’s Form 8-K dated November 22, 2017 and incorporated herein by reference (File No. 1-9025)
Amended Long Term Equity Incentive Plan of Vista Gold filed as Appendix D to the Company’s Proxy
Statement on March 31, 2019 and incorporated herein by reference (File No. 1-9025)
Deferred Share Unit Plan of Vista Gold filed as Appendix E to the Company’s Proxy Statement on March
31, 2019 and incorporated herein by reference (File No. 1-9025)
Employment Agreement of Douglas L. Tobler, dated July 1, 2019  previously filed as Exhibit 10.12 to the
Company’s Form 10-K dated February 27, 2020 and incorporated herein by reference (File No. 1-9025).
Amendment No. 1 to At-the-Market Offering Agreement dated June 24, 2020, previously filed as Exhibit 1.2
to the Corporation’s Form 8-K dated June 25, 2020 and incorporated herein by reference (File No. 1-9025)
Deed of Variation, previously filed as Exhibit 10.1 to the Company’s Form 8-K dated December 2, 2020 and
incorporated herein by reference (File No. 1-9025)
Amended and Restated Underwriting Agreement previously filed as Exhibit 1.1 to the Corporation’s Form 8-
K filed with the Commission on July 12, 2021 and incorporated by reference herein (File No. 1-9025)
Amendment No. 2 to the At-the-Market Offering Agreement dated December 10, 2021 previously filed as
Exhibit 1.3 to the Company’s Form 8-K dated December 13, 2021 and incorporated herein by reference
(File No. 1-9025)

81

    
Table of Contents

21
23.1
23.2
23.3
23.4
23.5
23.6
23.7
23.8
23.9
23.10
23.11
23.12
23.13
23.14
24
31.1

31.2

32.1

32.2

96.1
101.INS(1)

101.SCH(1)
101.CAL(1)
101.DEF(1)
101.LAB(1)
101.PRE(1)
104

Subsidiaries of the Company
Consent of Plante & Moran, PLLC, Denver, Independent Registered Public Accounting Firm
Consent of Tetra Tech, Inc.
Consent of Sabry Abdel Hafez
Consent of Rex Clair Bryan
Consent of Thomas L. Dyer
Consent of Amy L. Hudson
Consent of April Hussey
Consent of Chris Johns
Consent of Max Johnson
Consent of Deepak Malhotra
Consent of Zvonimir Ponos
Consent of Vicki Scharnhorst
Consent of Keith Thompson
Consent of John Rozelle
Powers of Attorney
Certification of Chief Executive Officer pursuant to Rule 13a-14(a) under the Securities Exchange Act of
1934, as amended
Certification of Chief Financial Officer pursuant to Rule 13a-14(a) under the Securities Exchange Act of
1934, as amended
Certification of Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to
Section 906 of the Sarbanes-Oxley Act of 2002
Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to
Section 906 of the Sarbanes-Oxley Act of 2002
Technical Report Summary for the Mt Todd Gold Project
Inline XBRL Instance Document – the instance document does not appear in the Interactive Data File
because its XBRL tags are embedded within the Inline XBRL document.
Inline XBRL Taxonomy Extension – Schema
Inline XBRL Taxonomy Extension – Calculations
Inline XBRL Taxonomy Extension – Definitions
Inline XBRL Taxonomy Extension – Labels
Inline XBRL Taxonomy Extension – Presentations
Cover Page Interactive Data File––the cover page interactive data file does not appear in the Interactive
Data File because its XBRL tags are embedded within the Inline XBRL document

* Management Contract or Compensatory Plan
** Certain portions of the exhibit that are not material and would be competitively harmful if publicly disclosed have been
redacted pursuant to Item 601(b)(10)(iv) of Regulation S-K. Copies of the unredacted exhibit will be furnished to the
Commission upon request.

(1)  Submitted  Electronically  Herewith.  Attached  as  Exhibit  101  to  this  report  are  the  following  formatted  in  XBRL
(Extensible  Business  Reporting  Language):  (i)  Consolidated  Statements  of  Income/(Loss)  for  the  years  ended
December 31, 2021 and 2020, (ii) Consolidated Balance Sheets at December 31, 2021 and 2020, (iii) Consolidated
Statements  of  Cash  Flows  for  the  years  ended  December  31,  2021  and  2020,  and  (iv)  Notes  to  Consolidated
Financial Statements.

ITEM 16. FORM 10-K SUMMARY

None.

82

Table of Contents

Pursuant to the requirements of Section 13 or 15(d) of the  Securities Exchange Act of 1934 , the registrant has

duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

SIGNATURES

Dated: February 24, 2022

Dated: February 24, 2022

VISTA GOLD CORP.
(Registrant)
By: /s/  Frederick H. Earnest
   Frederick H. Earnest,
   Chief Executive Officer
By: /s/  Douglas L. Tobler
   Douglas L. Tobler
   Chief Financial Officer

Pursuant to the requirements of the  Securities Exchange Act of 1934 , this report has been signed below by the

following persons on behalf of the registrant and in the capacities and on the dates indicated:

Dated: February 24, 2022

Dated: February 24, 2022

By: /s/  Frederick H. Earnest
   Frederick H. Earnest,
   Chief Executive Officer
   (Principal Executive Officer)
By: /s/  Douglas L. Tobler
   Douglas L. Tobler
   Chief Financial Officer
   (Principal Financial and Accounting Officer)

Pursuant to the requirements of the  Securities Exchange Act of 1934 , this report has been signed below by the

following persons on behalf of the registrant and in the capacities and on the dates indicated:

Signature
/s/ Frederick H. Earnest

Frederick H. Earnest
 *

John M. Clark
 *

C. Thomas Ogryzlo
 *

Deborah J. Friedman
 *

Tracy A. Stevenson
 *

W. Durand Eppler
 *

     Capacity

     Date

Director

February 24, 2022

Director

February 24, 2022

Director

February 24, 2022

Director

February 24, 2022

Director

February 24, 2022

Director

February 24, 2022

Director

February 24, 2022

Michael B. Richings
* By: /s/ Frederick H. Earnest

    Frederick H. Earnest, Attorney-in-Fact
Pursuant to Power of Attorney filed as Exhibit 24 herewith.

83