Quarterlytics / Financial Services / Asset Management / Adams Diversified Equity Fund, Inc.

Adams Diversified Equity Fund, Inc.

adx · ASX Financial Services
Claim this profile
Ticker adx
Exchange ASX
Sector Financial Services
Industry Asset Management
Employees 11-50
← All annual reports
FY2025 Annual Report · Adams Diversified Equity Fund, Inc.
Sign in to download
Loading PDF…
 
 
 
 
 
 
 
 
 
ADX Energy Ltd 
 
 
 
ABN 50 009 058 646 
 
 
 
 
 
ANNUAL REPORT 
 
 
31 DECEMBER 2025 

ADX ENERGY LTD 
CONTENTS 
 
 
 
- 1 - 
 
CORPORATE DIRECTORY .................................................................................................................................................. 2 
CHAIRMAN’S REPORT ...................................................................................................................................................... 3 
OPERATIONS REPORT .................................................................................................................................................... 10 
RESERVES REPORT ......................................................................................................................................................... 31 
DIRECTORS’ REPORT ...................................................................................................................................................... 35 
AUDITOR’S INDEPENDENCE DECLARATION .................................................................................................................... 50 
DIRECTORS’ DECLARATION ............................................................................................................................................ 51 
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME ............................................ 52 
CONSOLIDATED STATEMENT OF FINANCIAL POSITION .................................................................................................. 53 
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ................................................................................................... 54 
CONSOLIDATED STATEMENT OF CASH FLOWS ............................................................................................................... 55 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS .............................................................................................. 56 
CONSOLIDATED ENTITY DISCLOSURE STATEMENT ......................................................................................................... 90 
INDEPENDENT AUDITOR’S REPORT ................................................................................................................................ 91 
ADDITIONAL SHAREHOLDER INFORMATION .................................................................................................................. 96 
TENEMENT / PERMIT SCHEDULE .................................................................................................................................. 100 
 
 

ADX ENERGY LTD 
CORPORATE DIRECTORY 
__________________________________________________________________________________________________ 
- 2 - 
 
 
Directors 
Ian Tchacos (Executive Chairman)  
Paul Fink (Technical Director / CEO) 
Edouard Etienvre (Non-Executive Director) 
David Gilbert (Non-Executive Director)  
 
Company Secretaries 
Peter Ironside 
Amanda Sparks 
 
Registered and Principal Office 
29 Bay Road 
Claremont, Western Australia 6010 
Telephone: 
+61 8 9381 4266 
Web Page: www.adxenergy.com.au 
Email: admin@adxenergy.com.au 
 
Share Registry  
Computershare Investor Services Pty Ltd  
Level 17 
221 St George’s Terrace 
Perth, Western Australia 6000 
Telephone: +61 8 9323 2001 
Facsimile:  +61 8 9323 2033 
 
Solicitors  
Steinepreis Paganin 
Level 4, Next Building 
16 Milligan Street 
Perth Western Australia 6000 
 
Bankers  
Commonwealth Bank of Australia 
1254 Hay Street 
West Perth Western Australia 6005 
 
Stock Exchange Listing 
Australian Securities Exchange Ltd 
152-158 St Georges Terrace 
Perth Western Australia 6000 
ASX Code:  ADX 
 
Auditors  
In.Corp Audit & Assurance Pty Ltd 
Suite 11, 4 Ventnor Avenue 
West Perth, Western Australia 6005

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 3 - 
  
Dear Shareholder,  
 
During the year ended 31 December 2025, ADX Energy Ltd (“ADX” or the “Company”) has made important progress in 
three significant areas of portfolio development, including: 
 Permitting and operational readiness for the low-risk Shallow Gas Program in Upper Austria, 
 The resumption of well testing at the Welchau Oil and Gas Discovery in Upper Austria, and 
 The award of the C.R150.AU Sicily Channel Permit, Offshore Italy. 
The above mentioned portfolio developments provide the Company with multiple growth options such as the Shallow Gas 
Program which can deliver rapid production growth in Upper Austria together with the exceptional resource leverage 
provided by the Welchau Oil and Gas Discovery and the Sicily Channel Permit.  
The value of the Company is underpinned by our production in Austria. We remain focussed on maximising developed oil 
and gas production by seeking opportunities to enhance existing production, commercialise undeveloped reserves and the 
pursuit of compelling near field oil appraisal and exploration opportunities.  
The current extreme oil price volatility driven by geopolitical tensions in the Middle East is supportive of our near-term 
revenues, however we are mindful that a projected medium-term oversupply of crude oil may place downward pressure 
on oil prices. The Company has attempted to hedge future production revenues with an increasing proportion of gas in 
our portfolio.  Gas is likely to benefit from the undersupply situation in Europe and the dependence on relatively expensive 
imported LNG as Europe continues to reduce its dependence on Russian gas. 
At the time of writing ADX was preparing to enter a phase of multiple concurrent work programs to maximise shareholder 
value. The scheduling and the location of the Company’s Upper Austria program is shown on Figure 2. The preparatory 
work completed over the past year for the Shallow Gas Program drilling and the testing of Welchau has positioned ADX to 
recommence Welchau-1 well testing and proceed with the imminent drilling of the HOCH-1 shallow gas well. 
Simultaneously, workover operations in the Vienna Basin Fields have commenced and are expected to stabilise production 
and restore currently offline production. At the current oil price every additional barrel contributes meaningfully to 
revenues. 
 
Figure 1: Well testing and drill site construction operations in Upper Austria 
Welchau-1 well tesƟng operaƟons in the ADX-AT-II licence
during January 2026 confirming a light oil (46 API) column in
the well based on sampling recovered at surface,
HOCH-1 rig site construcƟon in the ADX-AT-I Licence during
February 2026 in preparaƟon for the commencement of
drilling in April 2026

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 4 - 
Shallow Gas Program and Near Field Oil exploration 
The HOCH-1 well (50% economic interest) is the first well in a three well Shallow Gas Program capable of rapidly adding to 
Austrian production by accessing nearby infrastructure. ADX has matured a further seven prospects using advanced seismic 
techniques across the shallow gas play which has previously delivered 230 BCF in the basin. The next wells permitted and 
scheduled for drilling are GOLD-1 (100% economic interest) and SCHOEN-1 (50% economic interest). Successful wells in the 
play have delivered between 4 to 5 mmscfpd (approx. 600 to 800 boepd). The program provides an opportunity to 
significantly upscale Austrian production and cash flow. In addition to the Shallow Gas Program, ADX is maturing a number 
of oil targets in close proximity to the Anshof field and its 3,000 BPD production capacity facility, providing the opportunity 
to rapidly and cost effectively develop new reserves. 
Welchau Oil and Gas Discovery 
On 3 March 2026, ADX released a transformational resource update for the Welchau project which re-rated the potential 
scale of the Welchau asset. The combination of well test results and technical work resulted in a prospective resources 
upgrade of Welchau to a Mean Prospective Resource1 of 387 BCF of gas and 31 MMBBL of light oil and condensate, totalling 
288 MMBOE (971 BCFE, refer to Resources Table on page 19). This represents a 3.5 fold increase in gas prospective resource 
since the last reporting date on 27 August 2025, as well as a condensate contribution and the inclusion of updip light oil 
accumulation. The presence of a light oil accumulation was validated by the physical recovery of 43.6° API light oil during 
testing operations. The confirmation of Welchau as a dual hydrocarbon system hosting both high-value liquids and massive 
gas volumes has significantly enhanced the project’s resource and economic potential.  
1Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application 
of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk 
of discovery and a risk of development. Further explorations appraisal and evaluation is required to determine the 
existence of a significant quantity of potentially moveable hydrocarbons. 
 
Figure 2: ADX’ Upper Austria Shallow Gas Program and Anshof Near Field oil activities 

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 5 - 
Sicily Channel Permit 
In addition to ADX’ Austrian asset development, the Company secured a highly prospective gas exploration permit in the 
Sicily Channel. On the 6th of August 2025 the C.R150:AU permit was awarded to ADX by a ministerial Decree.  ADX entry 
into the Permit was a great windfall for the Company. The acreage award was not by accident, ADX having applied for the 
licence in 2014 after having held contiguous acreage in Tunisia. On the 2nd of December 2025 ADX announced a revised 
Mean Prospective Resource1 of 619 BCF across nine prospects in the Permit (refer to Resources Table on page 27). The 
above-mentioned revision of resource estimate represents a 31% increase in prospective resources since the last reporting 
date prior to acreage award on 30 August 2022. The increase in resource estimates was the result of including four additional 
prospects, not previously quantified, utilising additional seismic and new near field data that became available to ADX after 
permit award.  
The Sicily Channel Permit provides ADX with a second exploration asset with high resource leverage. The Sicily Channel 
Permit provides similar scale to the Company’s portfolio as held in Austria. The Sicily Channel assets are highly attractive 
due to the proven existence of gas at shallow water depths of less than 100m, shallow drill depths and proximity to the 
Trans-Mediterranean Pipeline, allowing for a low-cost, high-margin development path into a premium European gas market.  
 
Figure 3: ADX C.R. 150 AU Permit, the shallow gas fairway, the nearby tie in point at the Lippone-Mazara onshore producing gas field 
and recently developed Argo, Cassiopea and Gemini fields. 
The above-mentioned activities have significantly expanded ADX’s prospect inventory and positioned the Company with a 
substantial resource base. The arithmetic sum of ADX current prospect inventory including Austria and Italy is a Mean 
Prospective Resource1 of 253 MMBOE Net with gas representing 79% of the combined prospect inventory.  
5
ADX C.R 150.AU Permit
ADX historic acreage in Tunisia
Nilde oil field
ENI GasProject
Argo, Cassiopea and
Gemini fields August 2024
and new applicaƟons

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 6 - 
 
Figure 4: Break down of oil and gas in ADX’ prospect inventory including Upper Austria and the Sicily Channel. All figures are 
arithmetically summed probabilistically estimated P(mean) volumes. 
Safety and Environment 
ADX has maintained an active operations program including ongoing production operations, work over operations and well 
testing during the reporting period. The Board of ADX is pleased to report that no lost time incidents (LTI) were recorded 
for safety or environmental causes at ADX’ Vienna Basin Fields, the Anshof Field or the Company’s exploration licences. 
The safety of our people, including our contractors, and the protection of the environment within the communities in 
which we work is of paramount importance to ADX. It is not only socially responsible, it is good business practice and 
critical for maintaining our license to operate. 
During the reporting period ADX has commenced undertaking base line measurements for the quantification, monitoring, 
reporting, and verification of methane emissions in accordance with new methane emission regulations, which came into 
force within the European Union (EU) on the 4th of August 2024 with a three-year phasing-in period. 
2026 Business Priorities 
The Company is well positioned with a compelling portfolio of assets in low risk, high value markets. ADX assets include 
long-term, stable oil production, low-risk fast track exploration and high-impact prospective exploration assets held at high 
equity levels. In the near term the Company will focus on the following business priorities: 
 
A. Maximising production and cashflow from its Vienna Basin and Anshof Oil Fields at a time when the current oil price 
is delivering very strong operating margins. At time of writing ADX is undertaking workovers to restore production 
from inactive wells in the Vienna Basin. ADX is also developing a program to enhance production by perforating behind 
pipe reserves in existing wells and tap into undeveloped reserves potential from infill drilling locations.  
 
B. The commencement of the Shallow Gas Program in Upper Austria has been several years in the making. We look 
forward to the drilling of the HOCH-1 well, the first well in the program, during April. The planned drilling campaign 
consists of an already permitted three-well program including the follow-on GOLD-1 and SCHOEN-1 prospects which 
were prioritised based on their high probability of success.  
 

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 7 - 
If successful, these shallow gas targets will produce 99% pure methane (biogenic gas) that enables simple and rapid 
development due to low costs and close proximity to pipeline infrastructure. In addition to the three (3) permitted 
prospects there are up to seven (7) additional prospects in this low risk but potentially highly profitable play. In 
addition to the Shallow Gas Program the Company is maturing a number of high priority oil targets in close proximity 
to the Anshof oil field and its 3,000 BPD production capacity facility planned for the drilling program in early 2027. 
 
C. ADX will continue to assess the results of the recent Welchau testing program including the assessment of light oil 
compositional data and pressure build up data from the well. Ongoing technical work will include the assessment of 
the significant updip light oil potential that has been identified westward of the Welchau-1 well and the primary 
deeper gas-condensate objective which remains untested. The deeper gas-condensate objective is a major future goal 
that can be reached by deepening the Welchau-1 well by approximately 600 to 700 metres. 
 
D. In the Sicily Channel we expect to make further progress towards purchasing additional seismic and historic well data 
prior to the commissioning of an independent resource assessment to provide further confidence regarding the 
potential of the Permit. ADX also is reviewing the potential to extend its acreage position.  
 
Funding 
In order to continue the development of the Company’s asset base, ADX plans to fund its exploration and development 
programs by farmin transactions complemented by production revenue and equity funding. ADX has been successful in 
securing multiple farmins which have mitigated exploration risk and minimise dilution. ADX has secured sufficient funds 
for our near-term exploration and its asset development activities. 
 
The Board of ADX believes that a European listing is an important corporate development for the Company. ADX is planning 
listing on the Oslo Børs’ Euronext Growth market during 2026 to provide trading access for European investors, enhance 
visibility, improve liquidity, broaden the shareholder base and provide support for future growth opportunities. The Board 
believes more support out of Europe for European Assets will translate into improved value development for our Australian 
investors. 
 
Board Succession 
During the reporting period Mr David (Dave) Gilbert joined the Board of ADX replacing the retiring Mr John Begg. We thank 
John for his contribution and welcome Dave to the Board of ADX. Dave is a highly experienced petroleum geologist with 
over 35 years of experience with leading E&P companies including Petrofina, Apache and OMV. Dave has had extensive 
international experience across Eastern Europe, the North Sea, the Adriatic Sea, North Africa and Asia Pacific. Of relevance 
to ADX, Dave held senior positions in relevant locations where ADX operates including Global Head of New Ventures with 
OMV based in Vienna, Austria and Director of Exploration with OMV Petrom based in Bucharest, Romania.  
In summary the calendar year 2025 has been a period of preparation and planning for our programmed activities in Austria 
and Italy during 2026. Shareholders can expect a period of high activity providing multiple catalysts and transformational 
growth opportunities. In addition to the Company’s asset activities it is likely that ADX business will be impacted by multiple 
geopolitical issues including the Middle East conflict and the Russia Ukraine conflict which are impacting crude and gas 
markets for the foreseeable future. Irrespective of energy price volatility ADX operates in high value markets desperate for 
domestic supply. We have provided as an annexure an overview of the natural gas market and crude oil market in Europe 
which provides a summary of the near-term supply demand outlook for gas and oil.  
We thank our Shareholders for your support and look forward to reporting the Company’s progress in the coming year. 

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 8 - 
 
IAN TCHACOS 
Executive Chairman 
 
ANNEXURE 
 
Oil and Natural Gas Markets 
 
Overview of European Markets 
In 2025, the global natural gas demand growth slowed down (+1%) compared to 2024 (+2.5%) with Europe contributing to 
most of the growth (demand up by 3%) driven by increase demand from the power sector. However, the reporting year 
was marked by uneven market conditions combining tight supply and strong demand (higher storage injection) in the first 
half of the year and strong liquified natural gas (LNG) supply growth (+10%) in the second half of the year with new supply 
from the US. During the reporting period, natural gas prices in Europe (TTF benchmark) became more closely correlated 
with Asian prices (Japan-Korea Marker) reflecting increasing regional integration driven by an increasing share of LNG in 
Europe’s natural gas supply mix and Europe’s willingness to pay premium prices to secure LNG supply. 
 
 
Chart 1: Average CME TTF and CME Japan-Korea Marker prices 
This trend is likely to continue throughout the second half of the decade with the European Union’s (EU) decision in 
December 2025 to phase out all Russian gas supplies by November 2027 (LNG and piped gas) which will leave a supply gap 
of 33 bcm anticipated to be filled with LNG imports in the absence of domestic supply growth. 
The geopolitical tensions in the Middle East ignited by the US and Israeli strikes on Iran since the beginning of March 2026 
have dramatically changed the prospects for the European natural gas market in 2026. While natural gas demand in Europe 
is expected to decline by 2% in 2026 (IEA forecast), the suspension of LNG production in Qatar has led to approximately 
19% of the World’s LNG volumes being no longer available for export causing fierce competition for spot LNG cargoes and 
affecting natural gas supply in Europe at a time when inventories in underground storage are low (29% full). As a result, 
European natural gas prices have increased by 56% in March 2026 (compared to February 2026) and stand as at the date 
of this report at US$ 17.2 per MMBtu, the highest level since February 2025. 
11.7
12.2
17.1
11.9
12.2
16.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
2024
2025
Mar-26
USD per MMBtu
TTF
JKM

ADX ENERGY LTD 
CHAIRMAN’S REPORT 
 
 
- 9 - 
Geopolitical tensions in the Middle East bring natural gas security of supply back to the spotlights and expose the 
vulnerability of Europe’s increasing reliance on LNG in the absence of sustainable domestic supply. This situation creates 
an opportunity for new domestic supply close to infrastructure which could be brought into production in a short 
timeframe. With a portfolio of 5 “ready to drill” shallow gas prospects in Upper Austria, ADX is in a strong position to benefit 
from attractive market conditions. 
Overview of the crude oil market 
Global demand for crude oil averaged 104.1 million bpd during the reporting year (+0.8% or 800 kbpd) and is expected to 
increase to 104.8 million bpd in 2026 (IEA estimate). This moderate increase (below global GDP growth) is consistent with 
OECD countries efforts to promote electrification and the displacement of fossil fuel. However, the similar to the natural 
gas market, the crude oil market, prices and market dynamics are mainly driven by supply rather than demand. During the 
reporting period crude oil, petroleum liquids and biofuels averaged 106.1 million bpd resulting in a 2.0 million bpd 
oversupply causing significant down pressure on prices with Brent prices averaging US$ 68 per bbl. This supply / demand 
imbalance is anticipated to continue in 2026 with the IEA forecasting an average supply of 107.2 million bpd and OPEC+ 
has shown limited willingness to implement further production cuts by shifting its focus from price protection to market 
share preservation (similar to its position in 2014). 
Despite such challenging fundamentals, geopolitical tensions in the Middle East triggered by the US-Israeli strikes on Iran 
have drastically altered market dynamics resulting in heightened volatility. Brent prices surged to US$ 120 per barrel 
following the de facto closure of the Strait of Hormuz, through which approximately 25% of the seaborne crude oil exports 
transit. An extended closure of the Strait of Hormuz would result in significant market disruptions and further price surges. 
ADX is closely monitoring the market conditions and seeks to benefit from elevated prices by increasing its crude oil 
production from the Vienna Basin Fields and the Anshof field. 
 
 
End of Chairman’s Report

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 10 - 
  
OPERATIONS REPORT 
 
Activities Overview 
 
ASSET ACTIVITIES SUMMARY 
 
 
Production and Development - Vienna Basin Fields and Anshof Field - Onshore Austria 
ADX is an operator and holds a 100% interest in the Vienna Basin production licences.  
ADX is the operator of the Anshof Field, holding a 70% economic interest in the Anshof-3 production well as well as a 60% 
economic interest in the Anshof-2A production well.  
 
The production rate, net to ADX, from the Vienna Basin Fields and the Anshof Field (collectively, Austrian Production) 
during the year averaged approximately 248 BOEPD compared to 211 BOEPD for the year ended December 2024. Oil and 
gas production continued during the year from the 100% ADX owned Vienna Basin Fields producing an average of 187 
BOEPD. The Anshof field averaged 98 BOEPD of which ADX’ share was 61 BOEPD.  
The production decrease in the second half of 2025 is primarily due to multiple wells being offline at the Vienna Basin 
Fields resulting from mechanical failures. A program of well workovers commenced during the Q4 quarter to restore 
production.  
 
 
Figure 5:  Austrian average daily oil equivalent production rate for oil, gas and total BOEPD 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 11 - 
 
Figure 6:  Work over operations at the Vienna Basin Oil Fields during December 2026 
Sales revenues from Austrian Production during the year totalled A$ 9.181 million net to ADX, a 6% increase compared to 
the year ended 31 December 2024. The increase in revenue is the result of a 7% increase in production from the Vienna 
Basin Fields and a 66% increase at Anshof, partially offset by a reduction in the average received crude oil price from 
A$113.07/bbl in 2024 to A$99.86/bbl in 2025. Gas prices increased from an average of A$97.81/BOE in 2024 to 
A$131.15/BOE in 2025. Figure 7 shows the variation in monthly sales revenue from ADX’ Austrian fields.  

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 12 - 
 
  Figure 7: Austrian Production monthly oil and gas sales revenue 
 
Gaiselberg and Zistersdorf (collectively the Vienna Basin Fields) continued stable and low-emissions oil and gas production 
through 2025. 68,236 BOE were produced and sold into the European market.   
ADX is finalising an asset plan with a view to enhancing production by perforating behind pipe reserves in existing wells 
and by drilling undeveloped reserves potential from infill drilling locations. Subject to achieving suitable investment rates 
of return, the plan will be implemented as soon as practically possible to take advantage of the current high oil price 
environment. 
 
During the year ADX continued to deploy a rolling hedging strategy seeking to provide stable near-term revenue generation 
during volatile market conditions. The following hedging transaction was deployed during period of favourable market 
conditions.  
 
• On 31 March 2025, ADX executed hedging transactions with Britannic Trading Limited with put and call option 
agreements for 12,000 barrels of oil at a Put Option Brent crude oil price of USD 65.00 per barrel, and a Call Option 
Brent crude oil price of USD 75.20 per barrel for April 2025 to July 2025 inclusive, being 3,000 barrels of oil per 
month. The quantity of hedged oil equated to approximately 100 BOPD during the period. 
 
The balance of the crude oil production from the Anshof and Vienna Basin Fields was unhedged during the period allowing 
ADX to maintain exposure to upside in Brent crude oil pricing. Gas production from the Vienna Basin Fields was also not 
hedged.  
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 13 - 
Anshof Oil Field  
 
Figure 8: Anshof Permanent Production Facility at the Anshof-3 location 
Anshof Field Area Economic Interest 
 
During the year, ADX acquired Xstate’s 20% economic interest in the Anshof Field Area, including all related rights and 
obligations under the Anshof Field Area partnership with consent from ADX’ remaining partner, MND Austria a.s. (MND). 
The transfer of interest was completed on 30 July 2025 and was effective from 1 April 2025.    
The transaction required no cash outflow from ADX, as the consideration (EUR 547,075) was fully offset against unpaid 
cash calls owed by XST to ADX. 
Following completion of the acquisition, ADX now holds a 70% economic interest in the Anshof Field Area, encompassing 
all associated production infrastructure and the Anshof-3 well. ADX continues to hold a 60% economic interest in the 
Anshof-2A well. MND retains the remaining 30% economic interest in the Anshof Field Area, comprising a 30% interest in 
Anshof-3 and a 40% interest in Anshof-2A. 
Permanent Production Facilities  
 
The permanent production facilities (PFF) continued to perform to expectation during 2025 (Figure 8).  
The Mining Authority confirmed that the Anshof production facility (ANS-STA) and the ANS-002A production well (Figure 
8) have met all operating conditions, with full compliance approval granted on 24 April 2025.  
The PFF has the capacity to process oil from multiple wells with production capacity of approximately 3,000 barrels per 
day. It is mostly unmanned and operates 24 hours per day with wireless data transmission.  
Oil production from the PPF is trucked to a nearby train loading facility and associated gas is used for power generation 
and process heat. Produced water is trucked and disposed of at ADX’s Zistersdorf facility.  
In late 2025, ADX exercised its option to purchase the leased production unit from ONEO GmbH bringing an end to the 
two-year lease agreement. The purchase of the facility was a good option from a commercial and operating perspective 
for the ongoing production of the Anshof Oil Field. The facility is required to continue production from the Anshof-3 and 
Anshof-2A wells, as well as processing further production from planned nearfield appraisal and exploration programs. The 
facility can also potentially process crude oil from future discoveries within ADX’ Upper Austria exploration licences.   
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 14 - 
The PPF provides the following opportunities to optimise field production at Anshof:  
• Increased production capacity (3,000 BPD);  
• Capability to process oil from multiple wells;  
• Additional oil storage capacity;  
• Use of associated gas for power generation and process heat; and  
• Enhanced automation. 
 
 
Figure 9: ANS-3 (left side, photo) and ANS-2A (right side, photo) wells at the Anshof PPF location 
Anshof Production  
 
Anshof-3 produced 21,073 bbls of oil with an uptime of 97.4% whilst Anshof-2A produced 14,758 bbls of oil with an uptime 
of 95% for 2025. 
The optimum production rates for each of the wells is set to support reservoir management objectives, ensuring that the 
bottom hole flowing pressure for both Anshof-3 and Anshof-2A wells remains above the oil’s bubble point pressure i.e., 
the pressure threshold below which gas begins to come out of solution from the oil. 
At the end of 2025, Anshof-3’s optimum rate was 59 barrels of liquids per day with a water-cut of 17% giving a gross oil 
output of 48 BOPD. For Anshof-2A, the optimum rate was 104 barrels of liquids per day, with a stable water-cut of 49.5%, 
yielding a gross oil output of 52 BOPD. 
Both Anshof-3 and Anshof-2A are located in a continuous oil pool with pressure communication. The performance of the 
Anshof field and particularly the Anshof-2A well is very encouraging. Optimising the well’s offtake rate has led to a 
consistent increase in oil production while maintaining a stable water cut, despite the well’s close proximity to the oil-
water-contact (OWC), (Figure 10). 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 15 - 
 
Figure 10: Anshof Oil Field outline, with an interpreted oil-water-contact at 1593 m TVDSS, appraised to date & areas of greater 
Eocene reservoir thickness with the bottom hole location of the Anshof-3 discovery well, the Anshof-2A side-track well & the Anshof-
2 well 
AUSTRIA EXPLORATION AND APPRAISAL 
Upper Austria Exploration Licences, Molasse Basin – Onshore Austria 
 
ADX is operator and holds a 100% interest in the ADX-AT-I and ADX-AT-II exploration licences other than the Anshof 
Discovery Area (70% economic interest), the Welchau Investment Area (75% economic interest) and the ADX-AT-I 
Investment Area (50% economic interest). Figure 11 shows the licence areas valid for 2025-2028. The Anshof Discovery 
Area, the Welchau Investment Area and the ADX-AT-I Investment Area are shown in grey shading. 
 
Figure 11:  Prospects and 2026 testing (WEL) & drilling plans are shown. Current resources of prospects (i.e. “WEL”) are provided in 
Table 1 below. The existing twenty-four (24) prospects within 5 different play types are shown on the map. 
ANS-3
Discovery
Oil Producer
ANS-2A
Appraisal
Oil Producer
ANS-2
Interpreted OWC 
1593mTVDSS

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 16 - 
During the 2025 reporting period, the exploration & appraisal program achieved several significant milestones. Key 
accomplishments included: 
 the preparation of the 2026 low risk shallow gas prospects drilling programme,  
 the successful resumption of well testing in the Reifling Formation at Welchau-1,  
 the identification of a light oil accumulation updip of Welchau-1, 
 the mapping of large gas-condensate appraisal targets located beneath the Welchau-1 well (“Duplex Array 1&2”) 
at shallower depths than considered prior to the drilling of Welchau-1, and  
 The maturation of appraisal and exploration prospects close to the producing Anshof Oil Field.  
See Figure 11 for the key prospects locations and Table 2 below for the 2025 Prospect resources summary (ASX release 
from 27 August 2025). 
 
1. Welchau Carbonate Play (ADX-AT- II licence) 
 
Welchau-1 Discovery Well 
 
The Welchau-1 exploration well was spudded on 24 February 2024, in the ADX-AT-II exploration licence, and reached a 
total depth (TD) of 1,733 metres on 17 March 2024. The well was suspended for well testing after running and cementing 
7-inch casing down to TD with the rig released on 28 March 2024.  
The Environmental Clearance, received from the Department of Nature Protection of the State Government was the last 
regulatory requirement to commence continuous (24 hour) flow testing operations of the Welchau-1 discovery well for a 
period commencing from 30 October 2024 until 31 March 2025.  
The testing of the Steinalm Formation and Reifling Formation commenced in November 2024. At end of 2024 the well was 
shut in after an initial flow test of the Reifling Formation indicated limited inflow. The well was being monitored to allow 
sufficient volume of reservoir fluids to enter the tubing string and be sampled before a decision is taken whether to 
stimulate the well and continue testing operations. 
On 14 January 2025, ADX testing operations were interrupted while an objection to existing Environmental Clearances for 
the drilling and testing was resolved in accordance with the State Administrative Court of Upper Austria. During September 
2025, the Upper Austrian State Administrative Court ruled the Environmental Clearances were granted in accordance with 
the regulations and that ADX has conducted drilling and testing activities in compliance with all the conditions of the 
permits (Ruling). The Welchau-1 operations were resumed in February 2026 with the continuation of the Reifling Formation 
testing.  
Welchau-1 Structural Definition 
 
The well drilled through a hydrocarbon-bearing fractured carbonate reservoir interval with continuous hydrocarbon shows, 
culminating in a light oil recovery from the Middle Triassic Steinalm Formation. Pressure data measured at Welchau 1 and 
Molln 1 confirms an overpressured system and probably connected hydrocarbon fairway indicating a robust seal and active 
recharge consistent with pressure communication between the Welchau 1 well and the significantly deeper Molln 1 well.   
The geometry of the Welchau anticline has been refined based on improved structural and stratigraphic insights from the 
Welchau 1 well, integrated with additional surface geological data resulting in a revised geological interpretation and 
structural model. The updated model indicates that the structural crest lies farther west, approximately 500 metres updip 
from the top of the Steinalm reservoir intersected in Welchau 1.  
Post-drill reinterpretation and mapping of the sparse 2D seismic dataset incorporating an updated velocity model derived 
from the Welchau 1 well data and integrated geological modelling has delineated a duplex thrust system directly beneath 
the Welchau 1 well. This series of thrust-related structures align updip with the gas-condensate tested duplex compartment 
of downdip well Molln 1 within the same thrust sheet (Figure 12). Pre-drill interpretations identified similar structures but 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 17 - 
considered them as economically less attractive due to their predicted much deeper positioning. Subsurface interpretation 
and modelling work is ongoing to further refine the overall structural model. 
The key outcomes of the technical review are:  
• 
The Welchau 1 well represents a strategically significant gas-condensate and potential light oil discovery, 
confirming a new regional hydrocarbon play characterised by overpressured reservoir conditions and verified 
hydrocarbon presence across multiple formations.  
• 
Pressure and structural data demonstrate continuity as well as aquifer and partial condensate communication 
between the Welchau 1 and the downdip Molln 1 discovery. This also indicates potentially significant gas 
condensate resources updip of Molln 1 (Figure 12, refer to cross section shown in Figure 13).  
• 
Welchau 1 encountered continuous hydrocarbon shows and successfully recovered light oil from the Middle 
Triassic Steinalm Formation, confirming a separate petroleum system (“light oil system”) within the extensive 
Welchau anticline structure. The downdip gas potential at Welchau (“gas condensate system”) was confirmed by 
testing results from the Molln 1 discovery well in 1989, which flow tested approximately 3.7 MMscfd with a rich 
condensate gas ratio of 40 bbls per MMscf from the Steinalm Formation. A regional map showing the Molln gas 
fairway and the Welchau updip light oil potential is shown in Figure 12.     
• 
The structural and stratigraphic interpretation of the Welchau anticline, incorporating post Welchau 1 geological 
and seismic data, indicates that the structural crest is located approximately 500 metres updip and to the 
northwest from the Steinalm reservoir intersected in Welchau 1 (Figure 13).   
• 
Based on the results of the Reifling Formation test resumption, the Reifling Formation is prognosed to be close to 
or coincident with oil water contact of the updip oil accumulation.  
• 
The Welchau 1 well can be subsequently deepened to appraise the central duplex structures updip of the Molln 1 
gas condensate discovery or sidetracked westwards to assess the updip oil potential. 
 
 
Figure 12: Regional map showing Molln Gas Fairway (GCS: gas-condensate system) and Welchau Updip Light Oil Potential (LOS: 
light-oil system) 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 18 - 
 
Figure 13: Schematic cross-section showing 1) potential light oil accumulation in shallow closure updip of Welchau-1;  2) Duplex 
structures mapped beneath the Welchau 1 wellbore updip of the Molln 1 discovery which tested gas condensate. Both 
potentially accessible by side tracking or deepening Welchau-1 
 
Figure 14: Showing oil recovered from the Reifling Formation during testing 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 19 - 
The light oil recovered (Figure 14) from the Reifling Formation has the same density as oil recovered from the deeper 
Steinalm Formation sampled during the drilling of Welchau 1. The lack of biodegradation in the oil sampled within the 
Reifling and the deeper Steinalm Formation, as well as the observed over pressured system, is indicative of a live oil 
accumulation in the crest of the Welchau structure updip of Welchau-1 well. 
Welchau Anticline Revised Resource Estimate 
 
A potentially significant light oil accumulation has been encountered at Welchau 1, however the original gas-condensate 
target has not yet been reached by the well. By combining the latest well logging, data testing data, new  surface geology 
and seismic depth conversion two potential gas-condensate filled duplex structures were mapped below the current well 
casing shoe. These are in line with the pre-drill original Welchau 1 target.  
On completion of the Welchau-1 testing program in February 2026 the Welchau resource estimates were updated. These 
comprise the light oil resources updip of the Welchau 1 well and the gas-condensate resources below the Welchau 1 well 
and updip of the Molln-1 gas condensate discovery. 
The total aggregated Mean Prospective1 oil and gas resource estimates for the Welchau anticline are 18 MMbbls (Pmean) 
for the updip light oil and 387 BCF (Pmean) with 14 MMbbls of condensate (Pmean) updip of Molln 1 (refer to Table 1 
below).  
1Cautionary Statement: Prospective Resources are those estimated quantities of petroleum that may potentially be 
recovered by the application of a future development project(s) related to undiscovered accumulations. These estimates 
have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is 
required to determine the existence of a significant quantity of potentially recoverable hydrocarbons. 
 
 
Table 1: Summary of the Welchau prospective resources estimate. Two Welchau accumulations, i) Welchau light oil and ii) 
Welchau deep gas-condensate (i.e. combination of two duplex arrays considered as one prospect). 
Prospective Resource Estimates are unrisked recoverable. They have been estimated using probabilistic methodology 
in accordance with SPE-PRMS (2018).  Resources are at 100% economic interest. 
 
Welchau-1 Well Test Operations and Future Appraisal Plans 
The well will be monitored to record pressure build up and fluid inflow. Further testing is being evaluated including a larger 
acid stimulation of the Reifling Formation requiring a coiled tubing unit.  
Consideration will be given to deepening the Welchau-1 well to appraise the central duplex structure updip of the Molln 1 
gas condensate discovery or sidetrack the well westwards to assess the updip light oil potential. 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 20 - 
2. Shallow Gas Targets – Low Risk and Rapid Production tie in Opportunities (ADX-AT-I & II licences) 
 
During the 2025 reporting period ADX matured multiple low risk, low-cost drilling prospects. Several newly identified leads 
also became firm, technically ready to drill prospects by the year end.  
The eight (8) shallow gas prospects were increased to eleven (11) prospects by the end of 2025. Three (3) new prospects, 
FUCHS, SAND and EHREN were matured,  in addition to the previously announced HASE prospect, after expanding the 
eastern ADX-AT-I exploration area and further increasing the current total shallow gas resources (See Figure 15 and Table 
2 below).  An example of the continued prospects generation based on new ADX - 3D seismic interpretation is shown below 
(see Figure 15). Several old wells based on 2D only have already proven the gas migration but were not placed in optimal 
location for production.  
 
Figure 15:  Newly created low risk shallow gas prospect in 2025 (“SAND” prospect). 
 
The HOCH prospect (see Figure 16 below), adjacent to the SCHOE prospect, will be the first well in the shallow gas drilling 
program. While both prospects are permitted for drilling, have a high chance of success and have similar P50 prospective 
resource sizes, HOCH was prioritised due to its larger gas resources upside (see Table 2 below for details).  HOCH-1 spud is 
scheduled for mid-April 2026. The proximal SCHOE prospect, most likely the final shallow gas well to be drilled in 2026, is 
also shown in Figure 16.         
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 21 - 
 
Figure 16:  The shallow gas prospects within the ADX-ATI area have similar P50 resources but HOCH has greater upside (refer to 
Table 2 below). 
The second shallow gas prospect to be drilled in 2026 is most likely GOLD (Goldbrunn-1 well). During the 2025 reporting 
period, detailed 3D AVO analysis together with analysis of nearby production wells from identical reservoirs was 
completed. A resources analysis indicated a relatively large upside for the prospect and a substantial initial production rate 
of up to 9 mmscf/d per well/ per reservoir and a high chance of success.  
Figure 17 below shows the GOLD shallow gas prospect plus follow up prospects GRAB and ZAUN, all closely clustered and 
near public pipeline systems.  
 
Figure 17:  3D seismic data together with an AVO (RMS – Root Mean Square) to the right clearly indicating the reservoir and gas 
presence (DHI or direct hydrocarbon indication), in line with nearby gas discoveries.  (refer to Table 2 below) 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 22 - 
3. Near Field Oil Exploration and Appraisal Prospects (ADX-AT-II) 
The Anshof Oil Field is producing from two wells, Anshof-3 and Anshof-2A. Several exploration and appraisal prospects are 
nearby to the Anshof Field and its PPF (Permanent Production Facility) with a production capacity of up to 3,000 barrels of 
oil per day (see below Figure 18). 
ADX has undertaken a detailed review of the SGB appraisal prospect immediately to the north of the Anshof Field as well 
as the PERG oil prospect (see Figure 11 for locations and Table 2 below for the 2025 prospect resources). The SGB oil 
prospect resource size remained unchanged in 2025, but the chance of success was significantly improved due to a detailed 
fault seal analysis based on nearby well data and 3D seismic interpretation. The risk of absent fault seal has now been 
largely mitigated. Risks related to oil migration, reservoir (Eocene) presence, and structure were already mitigated. The 
SGB prospect is now considered an appraisal well.  
The PERG oil prospect has been re-interpreted, resulting in a large increase in resource size for the main reservoir 
(Cretaceous “Cenomanian” sandstones). In addition, three secondary shallower target reservoirs have been identified, 
including the Eocene top reservoir that is producing at the Anshof oil field. PERG is relatively close to the Anshof Field with 
a shallow main reservoir depth (approximately 1800 m TVD). The proximity to the Anshof Field together with the large 
increase in resource size has elevated PERG as the preferred oil exploration target in 2026. Updated prospective resources 
for PERG are expected to be added to the prospect inventory during Q2 2026.  
 
 
Figure 18:  Map showing the ADX - Anshof Oil Field, the ANS PPF and 7 (seven) relatively close by oil exploration & 
appraisal prospects. The main technical focus during the year was the PERG oil prospect and the potential SGB appraisal 
well, next to ANS. Also note the combined (by arithmetic summation) Mean resources of 15 MMBOE.  (refer to Table 2 
below for the seven (7) prospects resources details) 
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 23 - 
4. High Impact Sub Flysch Gas Prospects 
During the reporting period a 3D PreSDM (pre stack depth migration) seismic reprocessing program neared completion. 
The reprocessed seismic is expected to de-risk existing prospects - including the drill-permitted IRR prospect (35 BCF Mean 
Prospective Resources 1, see Table 2 below) – while generating several additional large prospects (sub-Flysch area) in 2026.  
Of the five (5) current prospects within the new 3D PreSDM area (see Figure 11), four (4) are already included in the 
prospect inventory resources (see Table 2 below), with a combined Mean Prospective Resource1 of 252 BCF (Pmean, gross).  
1Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application 
of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk 
of discovery and a risk of development. Further explorations appraisal and evaluation is required to determine the 
existence of a significant quantity of potentially moveable hydrocarbons. 
5. Molasse Gas Prospects 
Most of these partly shallow gas prospects are fully covered by the newly processed 3D PreSDM seismic. The BUCH 
prospect (see Figure 11) located slightly to the north of the PreSDM area, has been matured; thanks to excellent 3D PSTM 
data, detailed AVO analysis, and well control from nearby gas production, the number of identified gas reservoirs 
(Oligocene Lower Puchkirchen high permeability sandstones) in this large partly structural-stratigraphic trap has increased 
significantly - to up to 10 stacked reservoirs.  
An ASX release with updated BUCH prospect resources is expected in Q2 2026. Current prospective resources (see Table 2 
below) are expected to increase substantially.  
 
 
Upper Austria Prospect Inventory – 2025 and 2026/2027 Activities  
 
The key objective of the 2025 exploration activity was to enhance and increase the value of the large ADX-AT-I & II 
exploration, appraisal and production areas, spanning 1,022 km2. The following achievements were accomplished:  
2025 Activities:  
• 
Welchau Carbonate Play: The biggest increase in exploration resources was a result of the Welchau-1 well test data 
from the shallowest Reifling reservoir. Welchau’s updip light oil and downdip duplex structures resulted in a  significant 
resources increase (refer to Table 2 below for detailed resources figures), supported by the down dip Molln-1 
discovery’s 1998 gas and condensate test production. The combined (Mean Prospective oil equivalent resources now 
stand at 115.5 mmboe (refer to Table 2 below). 
• 
Shallow Gas Play: A key focus was generating low risk, low-cost shallow gas prospects that can be quickly 
commercialised for rapid cash flow growth. Eleven (11) such prospects were generated.  
• 
Anshof Near Field Oil Prospects: During the reporting period ADX generated low risk appraisal prospects proximal to 
the Anshof Field, (e.g. SGB)  as well as large prospective resource potential new exploration prospects. The upgraded 
PERG exploration prospect has yielded a significant resource increase and a higher probability of success, with a 
resource update planned for Q2 2026. The current combined mean resources are 15 mmboe (Table 2).  
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 24 - 
 
Table 2:  Summary of the resource estimates for prospects across the different play types in Upper Austria. Volumes shown 
represent aggregated resource estimates for play types and totals. (Refer to ASX Investor Presentation dated 6 March 2026) 
 
2026 Activities - Austria 
 
• 
2026 Drilling Program  
Shallow Gas: The 2026 drilling programme will include the shallow gas prospects HOCH, GOLD and SCHOE for 
rapid commercialisation. These prospects share high probability of success, expected biogenic gas, shallow 
Miocene (Hall Formation) high productivity sandstones and mostly stratigraphic traps – but each has distinct 
geological risks (see for example Figure 16) so one well’s outcome won’t affect the others. 
Anshof Near Field Oil: A key objective for the 2026 drilling programme is to increase oil production through the 
Anshof PPF. This is expected to be achieved by drilling the low-risk appraisal well SGB or the larger but slightly 
riskier PERG prospect (See Figure 18). 
• 
(Q2) 2026 Resources Updates:  Figure 11 shows the location of the current prospects within the ADX-AT-I & II 
exploration areas. Several oil prospects and shallow gas leads will be added to the inventory during 2026. It is expected 
that an upgrade to the prospective resources for existing prospects – PERG, oil prospect and BUCH, gas prospect – will 
be released in Q2 2026.  
Low
P90
Best
P50
Mean 
(Pmean)
High
P10
Low
P90
Best
P50
Mean 
(Pmean)
High
P10
GOLD
4,1
7,5
8,3
13,4
-
-
-
-
100
ADX-AT-II
1,4
ZAUN
1,5
2,7
3,0
4,8
-
-
-
-
100
ADX-AT-II
0,5
GRAB
1,2
1,9
2,0
2,9
-
-
-
-
100
ADX-AT-II
0,3
HOCH
1,5
5,2
8,0
17,3
-
-
-
-
50
ADX-AT-I
1,3
SCHOE
1,9
5,4
6,3
12,1
-
-
-
-
50
ADX-AT-I
1,1
PICH
2,2
5,1
5,4
9,0
-
-
-
-
100
ADX-AT-II
0,9
STEY
1,2
2,4
2,7
4,6
-
-
-
-
100
ADX-AT-II
0,5
HASE
2,0
3,1
3,4
5,0
-
-
-
-
100
ADX-AT-I
0,6
Sub-total
15,6
33,3
39,1
69,1
-
-
-
-
6,5
SGB
0,1
0,3
0,3
0,8
0,3
0,9
1,3
2,7
100
ADX-AT-II
1,3
TERN
0,3
0,8
1,3
2,8
0,6
1,9
2,9
6,1
100
ADX-AT-II
3,1
WOLF
0,2
0,7
0,9
1,8
0,5
1,6
2,1
4,1
100
ADX-AT-II
2,2
PERG
0,2
0,7
0,8
1,8
0,5
1,9
2,4
4,8
100
ADX-AT-II
2,5
GRB
-
-
-
-
1,0
2,8
4,0
8,1
100
ADX-AT-II
4,0
LIND
0,1
0,3
0,6
1,3
0,2
0,5
0,9
2,0
100
ADX-AT-II
1,0
WIND
0,1
0,2
0,4
0,7
0,2
0,6
0,8
1,7
100
ADX-AT-II
0,9
Sub-total
1,0
3,1
4,3
9,3
3,3
10,2
14,3
29,4
15,1
ROS
-
-
-
-
2,5
11,0
19,6
49,4
75
ADX-AT-II
19,6
WEL UPDIP
-
-
-
-
3,6
11,7
17,7
38,6
75
ADX-AT-II
17,7
WEL DOWNDIP
56,2
230,2
387,4
956,7
1,4
8,1
13,6
38,3
75
ADX-AT-II
78,2
Sub-total
56,2
230,2
387,4
956,7
7,5
30,8
50,9
126,3
115,5
ZAM
11,0
49,0
93,0
216,0
-
-
-
-
100
ADX-AT-I
15,5
OHO
34,0
89,8
114,3
224,3
-
-
-
-
100
ADX-AT-I
19,1
IRR
9,0
25,8
35,3
74,4
-
-
-
-
50
ADX-AT-I
5,9
GMU
2,8
7,1
9,2
17,7
0,4
1,3
1,8
3,8
100
ADX-AT-I
3,3
Sub-total
56,8
171,7
251,8
532,4
0,4
1,3
1,8
3,8
43,8
BRUNN
1,3
3,4
4,2
8,0
-
-
-
-
50
ADX-AT-I
0,7
ARD
1,6
5,6
6,7
13,5
0,3
0,7
0,9
1,7
50
ADX-AT-I
2,0
BUCH
2,2
6,4
7,6
14,4
-
-
-
-
50
ADX-AT-I
1,3
Sub-total
5,1
15,4
18,5
35,9
0,3
0,7
0,9
1,7
4,0
TOTAL (Upper 
Austria)
Arithmetic Summation
134,7
453,7
701,1
1603,4
11,4
43,0
67,9
161,2
184,8
MMBOE MEAN 
Combined OIL 
& GAS 
Molasse
AUSTRIA
Shallow Gas
Near Field Oil 
(Anshof)
Welchau 
Carbonate
Sub-Flysch
Play Type
Prospect Name
NATURAL GAS
CRUDE OIL
Equity 
interest 
[%]
Permit
Prospective Resource (BCF)
Prospective Resource (MMBBL)

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 25 - 
• 
Sub Flysch Prospects with Large Resources Potential: In 2026, the 2025 almost completed new 3D PreSDM data 
generation will be used to add further large Sub-Flysch prospects, increasing their number, quality and chance of 
success. This could further boost the already substantial Sub-Flysch prospective resources in Q4 2026, based on the 
new interpretation and prospect generation. Table 2 shows the large total resources already available in this area.  
• 
Anshof Near Field Follow-up Potential: In addition to the latest PERG prospect upgrade, ADX will focus on further near-
field appraisal prospects such as LIND & WIND, adjacent to the now low risk SGB appraisal prospect (see Figure 18). 
ADX also intends to update large exploration prospects like TERN, WOLF (WG) and GRB (see Figure 18), aiming - as 
with PERG - to reduce geological risk and boost resource potential. 
• 
Shallow Gas and Molasse Gas Prospects: ADX will seek to expand the number of shallow Miocene gas prospects and 
define slightly deeper Oligocene gas prospects in the Molasse area. This is expected to generate additional follow-up 
opportunities near new gas discoveries. 
• 
Welchau Drilling: ADX will evaluate side-tracking Welchau-1 to appraise the updip light oil accumulation or deepening 
the well (~ 700 m) to the first duplex structure. ADX will also assess the value of new seismic acquisition, using 
contractors experienced in limestone/carbonate fields, to optimise drilling trajectories from Welchau-1 or future 
appraisal wells. 
 
Chart 2:  Pie Chart of Table EX2, showing the combined prospect resources in MMBOE by Play Type. The combined (MEAN case) 
resources currently contain 69 mmboe without Welchau & Rossberg prospects and 185 MMBOE with Welchau & Rossberg 
prospects. 
 
Upper Austria Farmout Program 
Shallow Gas Farmouts and Partnerships: Two 2026 shallow gas prospects (HOCH and SCHOE), to be drilled in 2026, have 
been farmed out to MND; others like GOLD, ZAUN and GRAB remain at 100% economic interest, with several companies 
reviewing for farm-in.  
Sub-Flysch Farm-in Targets: ADX is targeting farm-in partners for medium to large Sub Flysch prospects, including three (3) 
very large ones. Historically, few Sub Flysch wells have been drilled, but past efforts yielded Upper Austria’s largest gas 
fields, like the  Haidach Field (~ 150 bcf produced). 
 
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 26 - 
ITALY 
 
C.R150.AU Exploration Permit, Sicily Channel - Offshore Italy 
 
ADX via 100% owned subsidiary Audax Energy S.r.l. (Audax) is operator and holds a 100% interest in the C.R150.AU 
Exploration Permit (“Permit”)  
The 346 km2 Permit was awarded to Audax by the Italian Ministry of Environment and Energy Security (Ministry) through 
ministerial decree dated 6 August 2025. The Permit is valid for an initial exploration period of six years with up to two 
renewal periods of three years each. In the event of a discovery, an exploitation concession has a term of twenty years, 
which may be extended for a further ten years. The Permit is exclusive to Audax and is  assignable. 
The Permit is located in the Italian offshore of the Sicily Channel, in a water depth of 90-100 metres, just over 60 km from 
the shore of the island of Sicily (refer Figure 19). 
 
Figure 19: Location map showing the C.R150.AU Permit, bathymetry and producing fields with analogous gas reservoirs.                
The map also shows ENI’s recently developed Argo & Cassiopea gas fields as well as exploration acreage applications 
The Argo-Cassiopea project (Eni 60% Operator, Energean 40%), is located in the Sicily Channel, approximately 150 km 
southeast of the C.R150.AU permit, in water depths of up to 660 metres (refer Figure 19). Argo-Cassiopea, with 
approximately 360 BCF of reserves reported by ENI, is the biggest Italian gas field - in terms of reserves. Production at the 
Argo-Cassiopea field which started-up in August 2024.  
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 27 - 
Permit Prospectivity for Gas 
 
The Permit is highly prospective for high quality gas with minimal impurities (sweet gas) making future discoveries likely 
to be commercially attractive. The key attributes for the Permit can be summarised as follows:  
1. Proven existence of sweet gas in the Permit confirmed by several historical wells; 
2. Highly productive sandstone reservoirs with shallow drill depths (700 m to 1300 m) and moderate water depths 
(100 m); 
3. Availability of a large, high quality historical 2D seismic data set that can be reprocessed; 
4. Attractive fiscal terms (10% royalty + 29% Effective Tax Rate), in conjunction with strong demand for Clean Gas* 
that is subject to the high prevailing gas prices in Italy and Europe;   
5. Flexible permitting terms and low financial commitments;  
6. Two proximal and geologically similar producing field areas, one onshore (Lippone-Mazara) and one offshore 
(Argo-Cassiopea), contributing to excellent local gas pipeline infrastructure and  
7. Ms Giorgia Meloni centre-right coalition has created a positive, pro-development political environment which 
supports European Clean Gas .  
*Clean Gas is hydrocarbon gas that is produced and processed to high European Union environmental standards limiting 
both CO2 and methane emissions. 
Prospective Resources Revision 
 
An assessment of the Permit’s gas potential was announced in 2022 (refer ASX announcement 30 August 2022) advising 
that the Best Estimate prospective resource potential (recoverable) of five high graded gas prospects was 369 BCF1. The 
five already identified prospects are considered relatively low risk since these are mainly relatively simple, 4-way dip 
anticline closures featuring seismic amplitude responses (Direct Hydrocarbon Indicators or “DHI”). 
During last quarter of  2025, the prospective resources potential announced in 2022 were revised using additional 
available geotechnical data, resulting in a 31% increase in Prospective Resources. The current total aggregated mean 
prospective gas resource estimates for the Permit is 619 BCF (Pmean)1 for ADX 100% interest - ASX announcement 2 
December 2025. Refer to Table 3 below. 
 
Table 3: Table showing the C.R150.AU Permit Prospective Resources Comparison  
The Updated Volumes incorporate reservoir parameters from the nearby Lippone-Mazara onshore producing gas field, 
recovery factor assumptions from the recently developed Argo, Cassiopea and Gemini fields, shallow gas reservoirs 
encountered by oil wells within the Permit and three new prospects / leads within expanded Permit Area that were not 
included in the August 2022 evaluation. 
1Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application 
of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 28 - 
of discovery and a risk of development. Further explorations appraisal and evaluation is required to determine the 
existence of a significant quantity of potentially moveable hydrocarbons. 
Gas Play Identification and Permit Potential 
 
The gas play has been identified utilising historic 2D seismic and drilling data (e.g. from the Nilde-2 oil well) in the Permit. 
ADX has mapped prospects in the Permit which are geologically similar to the nearby Argo-Cassiopea field (offshore) and 
analogous to the Lippone-Mazara field (onshore). The methane rich (99%) biogenic gas play has been encountered in 
stacked pay reservoirs which provide the setting for large resource potential in a relatively small structural area (refer 
Figure 20). 
 
Figure 20: Summary of Sicily Channel Biogenic Gas Play and the Lippone Trend 
Planned Activities - Forward Program 
 
An agreement was signed with ENI to review a relatively large Sicily Channel seismic dataset in their Italian Milan head 
office in January 2026. This seismic review was completed in the 4th week of 2026 as a subsequent event. 
The main activity in Q1 2026 will be to finalise the purchase of several seismic lines from ENI (and possibly other seismic 
companies such as TGS) and further update the currently identified prospects, as well as generate new prospects and 
resources. This will also lead to the initial proposal for a new 3D seismic acquisition to further detail the prospect sizes 
resources and reduce the already quite small exploration risk.  
As soon as the above activities are completed, an independent view of the company’s assets including detailed analysis 
of the reservoir volumes, production forecasts, development plans, cost estimates, and economics (CPR) will be finalised. 
 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 29 - 
Commercial overview 
 
The economic viability of potential gas discoveries in the Permit is enhanced by the following attributes: 
• 
The majority of the permit is located on a coastal shelf with water depths of less than 100 metres. The drill depths 
for the targeted high porosity sandstones of Terravecchia Formation (Miocene age) are expected between 700 and 
2000 metres, based on historic drilling for deeper oil targets and existing 2D seismic lines; 
• 
The Permit is located approximately 50 kilometres from a potential gas tie in point onshore at Mazara. The gas 
network in this area is connected to the TRANSMED pipeline which is the major import route for gas into Italy from 
Algeria; 
• 
The likely presence of high quality, stacked sands with approximately 30% porosity increases the productive and 
resource potential of wells in the Permit. Based on data from Argo-Cassiopea field well production rates of between 
20 to 30 MMSCFPD and recoveries of approximately 50 BCF per well can be expected; 
• 
High value, sweet, biogenic gas (99% methane) requiring minimal processing is expected based on gas shows from 
the historic Nilde-2 well in Permit and the analogous, nearby Lippone-Mazara field; and 
• 
The fiscal terms are very favourable for offshore Italian gas fields. The corporate income tax rate payable on profits 
(IRES) is 28%. A 10% royalty is charged for offshore gas production. 
Gas pricing in Italy compares favourably to other European jurisdictions due to the dependence on imported gas. Italy is 
the second largest gas market in Europe (in demand terms) supported by power generation and industrial consumption. 
PSV (Italian gas reference price) historically trades at a small premium to Dutch TTF gas prices. 
 
ROMANIA 
 
Iecea Mare Production Licence and Parta Exploration Licence – Onshore Western Romania 
 
ADX holds a 49.2% shareholding in Danube Petroleum Limited (Danube). The remaining shareholding in Danube is held by 
Reabold Resources Plc. Danube via its wholly owned subsidiary, ADX Energy Panonia S.R.L., holds a 100% interest in the 
Parta Exploration licence (including a 100% interest in the Parta Appraisal Sole Risk Project) and a 100% interest in the 
Iecea Mare Production licence. ADX is the operator of the permit pursuant to a services agreement with Danube. 
 
Parta Exploration licence 
 
On behalf of Danube, ADX engaged in discussions with the regulatory authorities (Autoritatea Națională de Reglementare 
în Domeniul Minier, Petrolier și al Stocării Geologice a Dioxidului de Carbon  (ANRMPSG)) in relation to options for the 
extension of the Parta exploration phase 1 (Discussions). ADX has provided the required reports requested in support of 
the Discussions. ADX repeatedly requested an extension due to the inability to perform the work plan in Parta because of 
regulatory constraints, legal challenges and operational access restrictions.  
These unforeseen delays and operational restrictions prevented Panonia from undertaking a satisfactory work program 
despite investing more than EUR 10 million in exploration related expenditure, thereby denying Panonia the opportunity 
to drill wells in the most prospective areas identified within the licence area.  
In addition to the Discussions, ADX extended discussions with NAMR to include work programs for exploration and/or 
appraisal wells outside of the Parta licence in order to fulfill work commitments. 
 

ADX ENERGY LTD 
OPERATIONS REPORT 
________________________________________________________________________________ 
- 30 - 
Ultimately the permit extension of the Parta exploration Phase 1 was not possible. The lack of regulatory flexibility did 
not allow any positive outcome with the Regulatory Authority to secure an extension of the Parta exploration Phase 1. 
ADX on behalf of Panonia was reluctant to enter exploration phase 2 with additional significant commitments, due to the 
inability to satisfactorily perform the Phase 1 program despite its reasonable efforts.  
As a result, the Regulatory Authority has advised that exploration Phase 1 of the licence has expired without further 
extension. The Regulatory Authority has issued Panonia with invoices totaling EUR 4.2 million relating to alleged 
expenditures related to the unperformed exploration commitments applicable to the Parta for seismic acquisition and 
drilling.  
ADX on behalf of Panonia has formally disputed the invoices on the basis of having incurred significant costs to address 
the unforeseen challenges attributable to the work program, as well as due to the regulatory delays and access restrictions 
which have prevented Panonia from entirely fulfilling the work program, and denied Panonia the ability to benefit from 
the potential upside from making a discovery.  
ADX also reserves its rights to bring counterclaims for financial losses in excess EUR 10 million and consequential losses 
due to its inability to exercise its rights under the concession agreement to access land and explore in the most prospective 
areas of the permit. Further details can be found in the ADX ASX release dated 25 October 2025. 
 
Iecea Mare production licence 
 
The Iecea Mare production licence, which has a validity of 20 years, is not affected by the Discussions.  
Options to exploit the geothermal potential of the Romanian part of the Pannonian Basin are being investigated together 
with a subsurface review of the likely prospectivity. Legislation for the exploitation of geothermal energy is currently being 
created. However, the regulator has stated that a petroleum licence needs to be converted into a geothermal licence, 
before any non-petroleum operations can be performed. Furthermore, a geothermal licence can only be awarded after 
finalising all petroleum operations as defined in the relevant petroleum licence agreement.  
 
 
End of Operations Report

ADX ENERGY LTD 
RESERVES REPORT 
_______________________________________________________________________________ 
- 31 - 
  
Gaiselberg and Zistersdorf Production Assets, Vienna Basin – Onshore Austria 
 
ADX acquired the Vienna Basin Fields (Gaiselberg and Zistersdorf) in December 2019. Since then, the fields have been 
producing oil and gas continuously serving as ADX’s primary source of cashflow. 
 
ADX equity interest in the relevant production licenses are shown below: 
 
 
 
The following table presents ADX’s unaudited estimates of Developed Reserves as at 31 December 2025 (2025 Reserves). 
The 2025 Reserves incorporate technical revisions based on the most recent production performance, as well as the 
extension of proved undeveloped reserves through the maturation and planning of an infill development drilling project. . A 
3P reserves estimate is not shown in the following table. 
ADX Vienna Basin Unaudited Developed Reserves as of 31 December 2025 
1P Reserves 
2P Reserves 
Total Gross Reserves (BOE) @ 31 December 2024 
786,790 
 1,045,350  
Production 2025 (BOE) 
-73,600  
-73,600 
Reserves Extension (BOE) 
+390,360 
+493,040 
Total Gross Reserves (BOE) @ 31 December 2025 
1,103,550 
1,464,790 
 
 
 
Total Net Reserves (BOE) @ 31 December 2025 
1,103,550 
1,464,790 
 
 
 
Notes 
1. ADX holds a 100% working interest in the fields  
2. The notional reference point for reserves is the permit boundary or export line inlet.  
3. Deterministic evaluation methods have been used.  
4. Associate gas resources includes inerts sold with the gas.   
5. There is no fuel & flare consumption for the Fields.  
6. BOE means barrels of oil equivalent including solution gas  
7. Conversion factors are 1.124m3/tonne oil, 165.4 sm3 gas per boe and a gas Higher Heating Value of 40.7 MJ/sm3. 
 
 
 
 
Field
Working Interest
License Expiry 1
Block or License
Zistersdorf Field
100%
N/A
Zistersdorf
Gaiselberg Field
100%
N/A
Gaiselberg
ADX Vienna Basin Oil and Gas Field Interests

ADX ENERGY LTD 
RESERVES REPORT 
_______________________________________________________________________________ 
- 32 - 
Anshof Discovery Area, ADX AT-II AGS license, Upper Austria – Onshore Austria 
 
In January 2022, ADX discovered oil in Eocene reservoirs and shallow gas in Miocene reservoirs at the Anshof-3 well. The 
Eocene reservoir was completed and tested in May 2022, followed by the start of a long-term production test on 16 October 
2022. The Anshof-3 well produced continuously throughout the test period until it was shut-in on 19 September 2023. 
Production from Anshof-3 resumed in April 2024 following the installation of a permanent production facility. The Anshof-2 
appraisal well was spudded on 13 November 2023 but did not encounter an oil column and was suspended for a future side 
track. The Anshof-2A side-track appraisal well was spudded on 7 September 2024 and successfully tied into the Anshof 
permanent production facility as an oil producer on 2 December 2024.  
ADX equity interest in the relevant license is presented below: 
ADX Anshof Oil Field Interests 
 
 
 
Area 
Effective Dates 
Economic Interest 
Licence Expiry3 
Block or Licence 
Anshof Field  
31 December 2022 –    
15 September 2023 
80%1 
N/A 
ADX AT-II 
Anshof Field (except 
Anshof-2 & 2A Well)  
16 September 2023 –   
31 March 2025 
50%1 
N/A 
ADX AT-II 
Anshof Field (except 
Anshof-2 & 2A Well)  
1 April 2025 –  
current 
70%1 
N/A 
ADX AT-II 
Anshof-2 Well 
13 November 2023 – 
current 
60%2 
N/A 
ADX AT-II 
 
 Anshof-2A Well  
7 December 2024 – 
current 
60%3 
N/A 
ADX AT-II 
 
Notes 
1. ADX farmed down its 80% economic interest to MND in return for certain upfront and contingent payments on 15 
September 2023. On 31 March 2025, previous partner XST sold their 20% interest to the ADX Group. 
2. Previous partner XST elected not to participate in the Anshof-2 well resulting in ADX’ additional 10% economic interest 
in this well. 
3. Previous partner XST elected not to participate in the Anshof-2A well resulting in ADX’ additional 10% economic interest 
in this well. 
4. The licence term is for life of field. 
 
Drilling results from Anshof-2 indicated a much thicker than expected, high-quality reservoir section intersected at or below 
the oil water contact. These results suggested a flatter field structure with a thicker section of Eocene reservoir, prompting 
a remapping of the field and further appraisal to assess the reserve potential. The Anshof-2A side-track appraisal well was 
successfully drilled in September 2024. The well confirmed this interpretation, encountering thick, high porosity Eocene 
reservoirs up dip from the Anshof-2 well. A 6.5 m net vertical oil column within a 10 m net sand interval compared favourably 
to the 2.5 m net oil column found at the Anshof-3 discovery well.  
Since 2 December 2024 production at the Anshof Field has been sourced from both the Anshof-3 and the Anshof-2A wells. 
The production data and additional pressure measurements from the wells have enabled the improved understanding of 
reservoir performance thereby supporting a technical revision of developed reserves. The strong production performance 
from Anshof-2A exceeded prior expectations, leading to a reclassification of the previously booked “proved undeveloped” 
reserves to “proved developed producing” status in the 2025 reserves evaluation. As a result, the associated development 
project has been placed on hold.  
The following table summarises the unaudited estimates of gross and net reserves as of 31 December 2025, adjusted for 
production from the Anshof Field during the subsequent twelve-month period. The estimates are for developed reserves 
only. A 3P reserves estimate is not shown in the following table.  

ADX ENERGY LTD 
RESERVES REPORT 
_______________________________________________________________________________ 
- 33 - 
ADX Anshof Unaudited Reserves as of 31 December 2025 
1P Reserves 
2P Reserves 
Anshof Gross Reserves (BOE) @ 31 December 2024 
117,780  
352,640  
Gross Production 2025 (BOE) 
-37,975  
-37,975  
Anshof Reserves Revision (BOE) 
+321,585 
+189,825  
Anshof Gross Reserves (BOE) @ 31 December 2025 
401,390 
504,490  
 
 
 
Anshof Net Reserves (BOE) @ 31 December 2025 
245,250 
314,270  
Notes 
1. The notional reference point for reserves is the permit boundary or export line inlet.  
2. On 1 April 2025, ADX increased its interest in the Anshof Discovery Area from 50% to 70% through the acquisition of 
Xstate’s 20% economic interest resulting in a 70% economic interest and entitlement to gross reserves and resources 
(except for the Anshof-2A well where ADX has a 60% economic interest and 60% entitlement).  
3. Probabilistic methods have been used to determine oil in place and recoverable oil. Deterministic methods were 
used to develop production profiles and well forecasts. 
4. Associated gas is utilized as fuel gas for the production of electrical power and process heat.  
5. Conversion factors are 7.3 bbl per tonne of oil and 5,800 MMscf per MMboe of gas. 
 
 
ADX’ Total Austrian Reserves  
 
ADX’ total net Austrian Reserves are summarised below. This includes the Vienna Basin Fields Reserves and Anshof Field Net 
Reserves as of 31 December 2025. 
ADX Austrian Fields Unaudited Net Reserves as of 31 December 2025 
 
 1P Reserves  
 2P Reserves  
Vienna Basin Fields (BOE) * 
1,103,550  
           1,464,790 
Anshof Field (BOE)  
245,250 
314,270  
Total Reserves (BOE) @ 31 December 2025 
1,348,800 
1,779,060  
Notes: 
See Notes in Asset Tables above 
 
 
 
Reporting Standards 
Reserves and resources are reported in accordance with the definitions of reserves, contingent resources and prospective 
resources and guidelines set out in the Petroleum Resources Management System (PRMS) prepared by the Oil and Gas 
Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the American 
Association of Petroleum Geologists (AAPG), World Petroleum Council (WPC), Society of Petroleum Evaluation Engineers 
(SPEE), Society of Exploration Geophysicists (SEG), Society of Petrophysicists and Well Log Analysts (SPWLA) and European 
Association of Geoscientists and Engineers (EAGE), revised June 2018. 
 
Governance 
The Company maintains a governance framework over its petroleum reserves and resources estimation process. Oversight 
is provided by the Board through the Executive Management Team, which reviews the Company’s reserves governance 
policies annually. 
The estimation of petroleum reserves and resources is undertaken by suitably qualified technical personnel using 
industry-standard methodologies consistent with the SPE-PRMS. All internal estimates are subject to multi-disciplinary 

ADX ENERGY LTD 
RESERVES REPORT 
_______________________________________________________________________________ 
- 34 - 
review involving geology, reservoir engineering, production, and commercial teams to ensure technical robustness and 
alignment with operational data. 
The Company conducts an annual review of its reserve estimation process, including verification of input data, modelling 
assumptions, and classification decisions. These reviews may occur more frequently where material new information 
becomes available. 
Where appropriate, the Company engages independent external reserves auditors to review and validate its estimates. 
The scope of these external reviews typically includes assessment of reservoir models, decline curve analyses, 
development plans, and the reasonableness of key technical and commercial assumptions. 
The Company considers that these governance arrangements and internal controls provide reasonable assurance that its 
petroleum reserves and resources estimates are reliable, compliant with ASX Listing Rules, and prepared in accordance 
with accepted industry standards. 
PRMS Reserves Classifications Used 
1P Denotes low estimate of Reserves (i.e., Proved Reserves).  
2P Denotes the best estimate of Reserves. The sum of Proved plus Probable Reserves.  
3P Denotes high estimate of Reserves. The sum of Proved plus Probable plus Possible Reserves. 
 
1. Developed Reserves are quantities expected to be recovered from existing wells and facilities. 
a. Developed Producing Reserves are expected to be recovered from completion intervals that are open and 
producing at the time of the estimate.  
b. Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.  
 
2. Undeveloped Reserves are quantities expected to be recovered through future significant investments.  
 
A. Proved Reserves are those quantities of Petroleum that, by analysis of geoscience and engineering data, can be 
estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical 
and commercial conditions. If deterministic methods are used, the term “reasonable certainty” is intended to express a 
high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least 
a 90% probability that the quantities actually recovered will equal or exceed the estimate.  
 
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less 
likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely 
that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus Probable 
Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the 
actual quantities recovered will equal or exceed the 2P estimate. 
 
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely 
to be recoverable than Probable Reserves. The total quantities ultimately recovered from the project have a low probability 
to exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which is equivalent to the high-estimate scenario. 
When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will 
equal or exceed the 3P estimate. Possible Reserves that are located outside of the 2P area (not upside quantities to the 2P 
scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the possible 
development scope). Standalone Possible Reserves must reference a commercial 2P project. 
 
Persons compiling information about Hydrocarbons. Pursuant to the requirements of the ASX Listing Rule 5.31, the 
unaudited technical and reserves information contained in this report has been prepared under the supervision of Mr Alan 
Reingruber. Mr Reingruber is Managing Director of ADX VIE GmbH, is a qualified reservoir engineer with 25 years of technical, 
commercial and management experience in exploration, appraisal and development of oil and gas resources. Mr Reingruber 
has consented to the inclusion of this information in the form and context in which it appears. Mr Reingruber is a member 
of the SPE (Society of Petroleum Engineers).   
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 35 - 
 
Your Directors present their report for the year ended 31 December 2025. 
 
DIRECTORS 
The names and particulars of the Directors of the Company in office during the year and up to the date of this report were 
as follows. Directors were in office for the entire year unless otherwise stated. 
 
Ian Tchacos 
B.Eng (Mech.) 
Executive Chairman (Appointed 2 March 2010) 
Mr Tchacos was appointed as Non-Executive Chairman of ADX on 2 March 2010 and appointed as Executive Chairman on 
28 September 2015. He is a Petroleum Engineer with over 40 years international experience in corporate development 
and strategy, mergers and acquisitions, petroleum exploration, development and production operations, commercial 
negotiation, oil and gas marketing and energy finance. He has a proven management track record in a range of 
international oil company environments. As Managing Director of Nexus Energy, he was responsible for this company’s 
development from an onshore micro-cap explorer to an ASX top 200 offshore producer and operator. 
 
Mr Tchacos is a recipient of the RIU Good Oil Conference John Doran Lifetime Achievement Award.  The award is presented 
annually to recognise an individual with an outstanding long-term record of achievement in the Australian oil and gas 
industry. 
 
Other directorships of listed companies in the last three years: 3D Energi Limited (until 18 November 2025).  
 
Paul Fink  
MSc (Geophysics) 
Executive Director (Appointed 25 February 2008) 
Mr Fink has over 35 years of petroleum exploration and production industry experience in technical and management 
positions. He is a graduate from the Mining University of Leoben, Austria and started his career as a seismic data processing 
geophysicist and then worked predominantly on international exploration and development projects and assignments in 
Austria, Libya, Bulgaria, UK, Australia and Pakistan as Exploration and Reservoir Manager for OMV. In 2005, Paul started 
his own petroleum consultancy working on projects in Romania and as Vice President for Focus Energy, leading their highly 
successful exploration and development campaign in Western India. Paul was a key team member for the resulting highly 
successful IPO on the London Stock Exchange (Indus Gas) which led to a market capitalisation of over GBP 1.5 billion, partly 
due to third party reserves audits managed by Paul. 
 
Other directorships of listed companies in the last three years: None. 
 
Edouard Etienvre  
MSc (Management) 
Non-Executive Director (Appointed 7 January 2020) 
Mr Etienvre is an energy and natural resources executive and entrepreneur with over 15 years of experience in the oil and 
gas, mining, shipping and offshore facilities sectors initially with banks including sell-side equity research and reserve-based 
lending. More recently his experience has included positions with private and public E&P companies, ship owners and 
offshore facilities owners, mining companies and a mid-size trading group managing investments in companies active in 
the oil and gas sector.  Mr Etienvre has extensive commercial, business development, risk assessment, management and 
project management experience and expertise including deal sourcing, transaction structuring and execution, commercial 
negotiations and financing including debt, equity, off-take finance, vendor finance and reverse take-overs. 
 
Other directorships of listed companies in the last three years: None. 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 36 - 
David Gilbert 
BSc 
Non-Executive Director (Appointed 2 June 2025)  
Mr Gilbert is a highly experienced petroleum geologist with over 35 years of experience with leading E&P companies 
including Petrofina, Apache and OMV, and has extensive international experience across Eastern Europe, the North Sea, 
the Adriatic Sea, North Africa and Asia Pacific. Mr Gilbert held senior positions in relevant locations where ADX operates 
including Global Head of New Ventures with OMV based in Vienna, Austria and Director of Exploration with OMV Petrom 
based in Bucharest, Romania. During his career Mr Gilbert has specialised in exploration strategy, appraisal and 
development projects, new ventures and regulatory relations. His experience extends into building, mentoring and leading 
multicultural technical teams, managing joint ventures and executing projects. Mr Gilbert is proficient in managing the 
entire E&P cycle from prospect identification to production operations. He brings to ADX a focus on adding value through 
fit-for-purpose programs as well as the deployment of innovative geophysical and drilling technologies. 
 
Other directorships of listed companies in the last three years: None. 
 
Previous Director-John Begg 
BSc (Geol) 
Non-Executive Director (Appointed 4 March 2024 and Resigned 2 June 2025) 
Mr Begg is a highly experienced energy professional who has been instrumental in the discovery and commercialisation of 
numerous oil and gas fields in Australia, North Africa, SE Asia and California. During his career he has founded, promoted 
and held executive roles in a number of companies listed in Australia and the UK. John brings valuable strategic, technical 
and commercial support and guidance to the Board and management team.  Like Mr Tchacos, Mr Begg has also been 
awarded the RIU Good Oil Conference John Doran Lifetime Achievement Award (2018) for his outstanding long-term 
record of achievement in the Australian oil and gas industry. 
 
Other directorships of listed companies in the last three years: None. 
 
 
COMPANY SECRETARIES 
Peter Ironside B.Com, CA 
Appointed 8 March 1995 
Mr Ironside has a Bachelor of Commerce Degree and is a Chartered Accountant and business consultant with over 45 
years’ experience in the exploration and mining industry. Mr Ironside has a significant level of accounting, financial 
compliance and corporate governance experience including corporate initiatives and capital raisings. Mr Ironside has been 
a director and/or Company Secretary of several ASX listed companies including Integra Mining Limited and Extract 
Resources Limited (before $2.18bn takeover) and is currently a non-executive director of E79 Gold Mines Limited and 
Stavely Minerals Limited. 
Amanda Sparks B.Bus, CA, F.Fin 
Appointed 6 October 2015 
Ms Amanda Sparks is a Chartered Accountant with over 35 years of resources related financial experience, with explorers 
and producers. Ms Sparks has extensive experience in company secretarial, financial management, capital raisings, 
corporate transactions, corporate governance and compliance for listed companies and is currently a non-executive 
director and Company Secretary of Stavely Minerals Limited, a non-executive director of Godolphin Resources Limited 
and Company Secretary for E79 Gold Mines Limited.   
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 37 - 
MEETINGS OF DIRECTORS 
During the year, no formal Board meetings of directors were held.  
 
As the Board has two overseas directors, regular weekly online management meetings were held, and all-important 
resolutions agreed via circular resolutions.  During the year, 15 Circular Board resolutions were held. 
 
DIRECTORS’ INTERESTS IN SHARES AND OPTIONS 
The following table sets out each director’s relevant interest in shares and options in shares of the Company as at the date 
of this report. 
 
 
I Tchacos 
P Fink 
E Etienvre 
D Gilbert 
Shares 
 
 
 
 
Ordinary fully paid shares 
17,552,496 
12,224,542 
7,635,349 
2,006,060 
Options 
 
 
 
 
Unlisted Options, Ex Price $Nil, Expiry 31/07/2026 
269,532 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/10/2026 
380,358 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/01/2027 
283,929 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/05/2027 
275,893 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/07/2027 
300,000 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/10/2027 
218,750 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/01/2028 
131,425 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/05/2028 
89,003 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/07/2028 
196,514 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/10/2028 
167,079 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expiry 31/01/2029 
213,068 
- 
- 
- 
Placement Options - 3.9c Exp 17/1/28 
1,923,077 
- 
384,615 
 
Unlisted Options, Ex Price $Nil, Expire 31/05/2029 
670,673 
- 
- 
- 
Unlisted Options, Ex Price $Nil, Expire 31/07/2029 
640,086 
365,301 
- 
- 
Unlisted Options, Ex Price $Nil, Expire 31/10/2029 
700,000 
395,312 
- 
- 
Unlisted Options, Ex Price $Nil, Expire 31/01/2030 
520,833 
578,124 
- 
- 
Director Options - Ex Price 3.9c, Exp 17/1/2028 
- 
- 
- 
2,000,000 
Total Options 
6,980,220 
1,338,737 
384,615 
2,000,000 
 
CORPORATE INFORMATION 
Corporate Structure 
ADX Energy Ltd is a limited liability company that is incorporated and domiciled in Australia. ADX Energy Ltd has prepared 
a consolidated financial report incorporating the entities that it controlled during the year as follows: 
 
ADX Energy Ltd 
- 
parent entity 
AuDAX Energy Srl 
- 
100% owned Italian controlled entity 
Bull Petroleum Pty Ltd 
- 
100% owned Australian controlled entity (dormant) 
Terra Energy Limited 
- 
100% owned UK controlled entity 
ADX VIE GmbH 
- 
Terra Energy Limited owns 100% of this Austrian controlled entity 
Danube Petroleum Limited - 
49.18% owned UK controlled entity 
ADX Energy Panonia Srl 
- 
Danube Petroleum Limited owns 100% of this Romanian controlled entity 
Kathari Energia Limited 
- 
100% owned UK controlled entity 
Kathari Energia GmbH 
- 
Kathari Energia Limited owns 100% of this Austrian controlled entity 
 
Principal Activity 
The principal activities of the Group during the year were oil and gas production, appraisal and exploration.  
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 38 - 
Operations review 
Refer to the Operations Review preceding this report. 
 
Summary of Financial Position, Asset Transactions and Corporate Activities 
 
A summary of key financial indicators for the Group, with prior year comparison, is set out in the following table: 
 
 
Consolidated 
Consolidated 
 
31 December 2025 
31 December 2024 
 
$ 
$ 
Cash and cash equivalents held at year end 
4,758,239 
9,081,597 
Net profit/(loss) for the year before tax 
(13,066,096) 
(6,467,571) 
Income tax (expense)/benefit 
(902) 
(1,558,795) 
Net profit/(loss) for the year after tax 
(13,066,998) 
(8,026,366) 
Non-controlling interest in loss for the year 
(1,273,885) 
(158,834) 
Included in loss for the year: 
 
 
Operating revenue 
10,793,239 
10,676,046 
Cost of sales – operating costs 
(9,689,111) 
(9,090,642) 
Cost of sales – depreciation/amortisation 
(3,564,720) 
(2,660,161) 
Restoration expenses – changes in abandonment provision 
(616,135) 
(408,657) 
Dry well costs 
- 
(146,014) 
Exploration expensed 
(3,700,937) 
(2,266,393) 
Basic profit/(loss) per share  
(1.98) cents 
(1.52) cents 
Net cash from/ (used in) operating activities 
(3,479,053) 
(1,766,069) 
Net cash from/ (used in)  investing activities 
(3,588,267) 
(10,305,964) 
Net cash from/ (used in)  financing activities 
2,547,068 
13,037,943 
 
 
Production in Austria was as follows: 
 
 
31 December 2025 
31 December 2024 
Crude Oil Sold (Barrels)* 
99,288 
85,039 
Gas Sold (Boe) 
4,673 
5,230 
Total Oil Equivalent (Boe) 
103,961 
90,269 
 
* Crude oil sold represents total gross production. This includes 26,484 crude oil barrels sold from Anshof operations 
for the year ended 31 December 2025 (2024: 26,484).  Refer to note 25 of the financial statements for partnership 
details for the Anshof operations. 
 
 
 
Funds from Farmouts and Partners  
During the year ADX received the following contributions from partners associated with Anshof, and AT-I Investment Areas: 
• 
Development expenditure EUR 302,622 (A$ 547,107). 
• 
Exploration and operating expenditure EUR 221,797 (A$ 392,483). 
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 39 - 
Loan Notes:  
On 10 January 2025, ADX announced that it had entered into deeds of variation with the Loan Note holders in relation to 
25 Loan Notes of A$ 50,000 each totalling A$ 1.25 million (Loan Notes).  
• Five (5) Loan Notes of A$ 50,000 each (A$ 250,000 in total) were repaid on the original repayment date of 11 
January 2025. 
 
• Under the revised terms, the repayment period has been extended to 31 March 2026. The revised terms for the 
Loan Notes are summarised as follows:  
 
Loan Note A 
Loan Note B 
Total Loan Notes 
Face Value of Each Loan Note 
$50,000 
$50,000 
$50,000 
Number of Loan Notes Issued 
4 
21 
25 
Total Loans aggregate amount 
$200,000 
$1,050,000 
$1,250,000 
Loan Repayment Date 
31 March 2026 
31 March 2026 
31 March 2026 
Interest Rate per annum (payable 
quarterly in arrears) 
8% 
12% 
8-12% 
Free Attaching Unlisted Options 
with an Exercise Price of $0.05, 
expiring 31 March 2026 – Per 
Loan Note 
500,000  
per Loan Note 
(2,000,000 in Total) 
- 
2,000,000  
in Total 
Free Attaching Unlisted Options 
with an Exercise Price of $0.055, 
expiring 31 March 2026 – Per 
Loan Note  
500,000  
per Loan Note 
(2,000,000 in Total) 
1,000,000  
per Loan Note  
(21,000,000 in Total) 
23,000,000  
in Total 
 
Subsequent to year end, announced on 10 March 2026, $750,000 of Loan Notes were varied with a repayment date 
extended to 30 September 2027. The remaining $500,000 loan notes will be paid on the due date of 31 March 2026. Refer 
to the Subsequent Events note in this report. 
 
Hedging 
During the year the following hedging transaction was entered into.  
• 
On 31 March 2025, ADX executed hedging transactions with Britannic Trading Limited with put and call option 
agreements for 12,000 barrels of oil at a Put Option Brent crude oil price of USD 65.00 per barrel, and a Call 
Option Brent crude oil price of USD 75.20 per barrel for April 2025 to July 2025 inclusive, being 3,000 barrels of 
oil per month. The quantity of hedged oil equated to approximately 100 BOPD during the period. 
Currently crude oil production from the Anshof and Vienna Basin Fields remains unhedged allowing ADX to maintain 
exposure to upside in Brent crude oil pricing. Gas production from the Vienna Basin Fields is not hedged. 
 
Net hedging gains/(losses) are disclosed in note 2 of the financial statements. 
 
Placement Raising A$ 3.5 million 
In November 2025, ADX advised it had raised A$3.5 million (before costs) via the issue of 134,615,385 new fully paid ordinary 
shares at an issue price of A$0.026 per share. One (1) free-attaching unlisted option was issued for every two (2) Placement 
Shares. The exercise price of the Placement Options is A$0.039 with an expiry date of 17 January 2028. The issue of the 
Options is subject to Shareholder approval to be obtained at a meeting to be held late May 2026. 
 
DIVIDENDS 
No dividends were paid or declared during the year. The Directors do not recommend payment of a dividend. 
 
ENVIRONMENTAL ISSUES 
The Company’s environmental obligations are regulated by the laws of the countries in which ADX has operations. The 
Company has a policy to either meet or where possible, exceed its environmental obligations. No environmental breaches 
have been notified by any governmental agency as at the date of this report. 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 40 - 
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS 
Significant changes in the state of affairs of the Group during the year are detailed in the Operations Report and Financial 
Summary in this report.   
 
FUTURE DEVELOPMENTS 
The Group intends to continue its production operations in Austria and continue its’ exploration and development 
programme on its existing permits, and to acquire further suitable permits for exploration and development. Additional 
comments on likely developments are included in the Operations Report. 
 
SHARES UNDER OPTION 
Unissued ordinary shares of the Company under option at the date of this report are as follows: 
 
 
Number 
Exercise Price 
Expiry Date 
Listed Options  
64,285,731 
15 cents 
08/05/2026 
Total Listed Options  
64,285,731 
  
  
 
 
Number 
Exercise Price 
Expiry Date 
Unlisted Options  
              500,000  
17 cents 
31/03/2026 
Unlisted Options  
269,532 
Nil cents 
31/07/2026 
Unlisted Options  
380,358 
Nil cents 
31/10/2026 
Unlisted Options  
283,929 
Nil cents 
31/01/2027 
Unlisted Options  
275,893 
Nil cents 
31/05/2027 
Unlisted Options  
300,000 
Nil cents 
31/07/2027 
Unlisted Options  
218,750 
Nil cents 
31/10/2027 
Unlisted Options  
131,425 
Nil cents 
31/01/2028 
Unlisted Options  
89,003 
Nil cents 
31/05/2028 
Unlisted Options  
196,514 
Nil cents 
31/07/2028 
Unlisted Options  
167,079 
Nil cents 
31/10/2028 
Unlisted Options  
2,000,000 
5 Cents 
31/03/2026 
Unlisted Options  
23,000,000 
5.5 Cents 
31/03/2026 
Unlisted Options  
213,068 
Nil cents 
31/01/2029 
Unlisted Options  
670,673 
Nil cents 
31/05/2029 
Unlisted Options  
640,086 
Nil cents 
31/07/2029 
Unlisted Options  
365,301 
Nil cents 
31/07/2029 
Unlisted Options  
700,000 
Nil cents 
31/10/2029 
Unlisted Options  
395,312 
Nil cents 
31/10/2029 
Total Unlisted Options  
30,796,923 
  
  
 
No option holder has any right under the options to participate in any other share issue of the Company or any other 
related entity.  
 
During the year, 1,571,402 options at a nil exercise price were exercised. 
 
INDEMNIFICATION AND INSURANCE OF OFFICERS 
The Company has paid a premium to insure the Directors and Officers of the Company and its controlled entities. Details of 
the premium are subject to a confidentiality clause under the contract of insurance. 
 
The liabilities insured are costs and expenses that may be incurred in defending civil or criminal proceedings that may be 
brought against the officers in their capacity as officers of entities in the group. 
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 41 - 
REMUNERATION REPORT (AUDITED) 
 
The Directors present the 2025 Remuneration Report, outlining key aspects of ADX’ remuneration policy and framework, 
together with remuneration awarded this year. 
The report is structured as follows: 
A. Key management personnel (KMP) covered in this report 
B. Remuneration policy, link to performance and elements of remuneration 
C. Contractual arrangements of KMP remuneration 
D. Remuneration awarded 
E. Equity holdings and movement during the year 
F. 
Other transactions with key management personnel 
G. Use of remuneration consultants 
H. Voting of shareholders at last year’s annual general meeting 
 
A. KEY MANAGEMENT PERSONNEL COVERED IN THIS REPORT 
 
For the purposes of this report key management personnel (KMP) of the Group are defined as those persons having 
authority and responsibility for planning, directing and controlling the major activities of the Group, directly or indirectly, 
including any Director (whether Executive or otherwise). 
 
Key Management Personnel during the Year 
Directors 
Ian Tchacos 
- 
Executive Chairman 
Paul Fink  
- 
Executive Director  
Edouard Etienvre 
- 
Non-Executive Director 
Dave Gilbert 
- 
Non-Executive Director – appointed 2 June 2025 
John Begg 
- 
Non-Executive Director – resigned 2 June 2025 
Other KMPs 
Amanda Sparks 
- 
Company Secretary and Chief Financial Officer 
 
B. REMUNERATION POLICY, LINK TO PERFORMANCE AND ELEMENTS OF REMUNERATION 
 
The objective of the Group’s executive reward framework is to ensure reward for performance is competitive and 
appropriate for the results delivered. The framework aligns executive reward with achievement of strategic objectives and 
the creation of value for shareholders. 
 
The Board ensures that executive reward satisfies the following key criteria for good reward corporate governance 
practices: 
• 
Competitiveness and reasonableness; 
• 
Acceptability to shareholders; 
• 
Transparency; and 
• 
Capital management. 
 
Remuneration Philosophy 
The performance of the Group depends upon the quality of its Directors and Executives. To prosper, the Group must 
attract, motivate and retain highly skilled Directors and Executives. 
 
To this end, the Group embodies the following principles in its remuneration framework: 
• 
provide competitive rewards to attract high calibre Executives; and 
• 
if required, establish appropriate, demanding performance hurdles in relation to variable Executive remuneration. 
 
The Group has structured an executive framework that is market competitive and complementary to the reward strategy 
for the organisation.   

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 42 - 
Both Executive and Non-Executive Directors may elect, subject to Shareholder approval, to reduce their cash director fees 
and consulting fees in lieu of Shares in accordance with the Company’s Directors’ Share Plan (Salary Sacrifice). The Shares 
are issued on a quarterly basis according to the Directors’ fees owing to each of the Directors at that time, at an issue price 
of no less than the volume weighted average sale price of Shares sold on ASX during the 90 days prior to the expiration of 
the corresponding calendar quarter in which the Directors’ fees were incurred. The Executive Directors may also elect, 
subject to Shareholder approval, to reduce their cash consulting fees in lieu of Options in accordance with the Company’s 
Performance Rights and Option Plan. The Options are issued on a quarterly basis according to the consulting fees owing to 
each of the Directors at that time, using a deemed price of no less than the volume weighted average sale price of Shares 
sold on ASX during the 90 days prior to the expiration of the corresponding calendar quarter in which the consulting fees 
were incurred. 
 
Remuneration Committee 
Due to the limited size of the Company and of its operations and financial affairs, the use of a separate remuneration 
committee is not considered efficient for ADX. The Board has taken a view that the full Board will hold special meetings or 
sessions as required. The Board are confident that this process for determining remuneration is stringent and full details 
of remuneration policies and payments are provided to shareholders in the annual report and on the web. The Board has 
adopted the following policies for Directors’ and executives’ remuneration. 
 
Non-Executive directors’ remuneration 
Non-executive Directors’ fees are paid within an aggregate limit which is approved by the shareholders from time to time. 
Retirement payments, if any, are agreed to be determined in accordance with the rules set out in the Corporations Act as 
at the time of the Director’s retirement or termination. Non-executive Directors’ remuneration may include an incentive 
portion consisting of options or similar instruments, as considered appropriate by the Board, which may be subject to 
shareholder approval in accordance with ASX listing rules.  
 
The amount of aggregate remuneration sought to be approved by shareholders and the manner in which it is apportioned 
amongst Directors is reviewed annually. The Board considers the amount of Director fees being paid by comparable 
companies with similar responsibilities and the experience of the Non-executive Directors when undertaking the annual 
review process. Fees for Non-Executive directors are not linked to the performance of the Group.   
 
Executive Remuneration  
In determining the level and make-up of Executive remuneration, the Board negotiates a remuneration to reflect the 
market salary for a position and individual of comparable responsibility and experience. Remuneration is compared with 
the external market by reviewing industry salary surveys and during recruitment activities generally. If required, the Board 
may engage an external consultant to provide independent advice in the form of a written report detailing market levels 
of remuneration for comparable Executive roles. 
Remuneration consists of a fixed remuneration and may include a long-term incentive portion as considered appropriate. 
 
Executives’ remuneration is currently a fixed consulting fee based on a daily rate for actual days worked.    
 
Long term incentives granted to Executives are delivered in the form of options. The option incentives granted are aimed 
to motivate Executives to pursue the long-term growth and success of the Company within an appropriate control 
framework and demonstrate a clear relationship between key Executive performance and remuneration. Director options 
are granted at the discretion of the Board and approved by shareholders. Performance hurdles are not attached to vesting 
periods; however, the Board may determine appropriate vesting periods to provide rewards over a period of time to key 
management personnel. During the year there were no performance related payments made. 
 
C.  CONTRACTUAL ARRANGEMENTS OF KMP REMUNERATION 
 
On appointment to the board, all non-executive directors enter into a service agreement with the Company in the form of 
a letter of appointment. The letter summarises the board policies and terms, including compensation, relevant to the office 
of director. Non-Executive Directors are paid a fee of A$ 33,000 per annum, inclusive of any superannuation if applicable. 
In accordance with the Company’s Directors’ Share Plan (Salary Sacrifice), part may be paid in cash, and part in shares. 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 43 - 
Remuneration and other terms of employment for the Executive Directors and the other key management personnel are 
also formalised in consultancy agreements.  The major provisions of the agreements relating to remuneration are set out 
below. 
 
Name 
Term of agreement 
Base annual remuneration inclusive of 
superannuation at 31/12/25 
Termination 
benefit 
I Tchacos – Executive 
Chairman – Technical 
Consultancy 
Term of 2 years 
commencing 1 July 2020.  
Subsequently monthly. 
Technical consulting - $1,500 per day (cash) 
 
 2 months (up 
to $18,000)  
I Tchacos – Executive 
Chairman – Corporate 
Consultancy 
 
Ongoing 
Corporate consulting - $500/month (cash) plus 
options subject to Board and Shareholder 
approval for additional work at a value of 
$1,500 per day 
 
In addition, I Tchacos receives Directors fees of 
$25,000 pa.  80% paid in cash, 20% paid in 
equity (subject to Shareholder approval). 
 2 months (up 
to $18,000)  
P Fink – Executive 
Director – Consultancy 
with ADX Energy Ltd 
Term of 2 years 
commencing 1 July 2020.  
Subsequently monthly. 
Retainer of $500 per month (cash) plus 
consulting at $1,500 per day 
(50% cash and 50% equity (options), subject to 
shareholder approval) 
 
In addition, P Fink receives Directors fees of 
$25,000 pa. 80% paid in cash, 20% paid in equity 
(subject to Shareholder approval).  
 2 months (up 
to $18,000)  
P Fink – Executive 
Director – Consultancy 
with ADX VIE GmbH 
No written agreement 
Consulting at EUR 900 per day   
None 
E Etienvre – Non-
Executive Director – 
Consultancy with ADX 
Energy Ltd 
Term of 2 years 
commencing 1 July 2020.  
Subsequently monthly. 
Consulting at $1,500 per day 
(50% cash and 50% equity (shares), subject to 
shareholder approval) 
 
In addition, E Etienvre receives non-executive 
Directors fees of $33,000 pa. 61% paid in cash, 
39% paid in equity (subject to Shareholder 
approval).   
 1 month (up 
to $7,500)  
D Gilbert– Non-
Executive Director – 
Consultancy with ADX 
Energy Ltd 
 
Term of 1 year 
commencing 1 August 
2024 (prior to 
appointment as a 
Director). 
Subsequently monthly. 
 
Consulting at $1,500 per day 
(70% cash and 30% equity (shares), subject to 
shareholder approval) 
 
In addition, D Gilbert receives non-executive 
Directors fees of $33,000 pa. 61% paid in cash, 
39% paid in equity (subject to Shareholder 
approval).   
 1 day (up to 
$1,500)  
Amanda Sparks – 
Company Secretary 
and Chief Financial 
Officer 
 
Ongoing 
Monthly retainer of $3,200, 50% paid in cash 
and 50% paid in equity.  Additional hours above 
20 hours per month are paid in cash at $160 per 
hour.  
 
None  
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 44 - 
D. REMUNERATION OF KEY MANAGEMENT PERSONNEL 
 
Details of the remuneration of each Director and named executive officer of the Company, including their personally-related 
entities, during the year was as follows: 
 
 
  
Post-Employment 
Share Based 
Share Based 
 
2025 
Cash salary, directors 
fees and consulting 
fees, including 
accruals* 
$ 
 
 
 
Superannuation 
$ 
 
 
Shares (in lieu of cash 
fees) (1) 
$ 
 
Options (in lieu of 
cash consulting fees) 
(1) 
$ 
 
 
 
Total  
$ 
Directors 
 
 
 
 
 
I Tchacos  
331,304 
3,259 
3,750 
57,000 
395,313 
P Fink 
383,065 
- 
3,750 
31,969 
418,784 
E Etienvre 
57,868 
- 
28,242 
- 
86,110 
D Gilbert (2) 
80,011 
2,052 
- 
- 
82,063 
J Begg (3) 
16,223 
1,418 
7,734 
- 
25,375 
Other KMP 
 
 
 
 
 
A Sparks  
83,840 
11,713 
14,400 
- 
109,953 
TOTAL 2025 
952,311 
18,442 
57,876 
88,969 
1,117,598 
 
(1) Share based payments. These represent the amount expensed in the year for Shares and Options in lieu of cash director and consulting 
fees.  
(2) Appointed 2 June 2025.  
(3) Resigned 2 June 2025.  
* Includes accruals of fees paid subsequent to year end via equity.  
 
 
  
Post-Employment 
Share-Based 
Share-Based 
 
2024 
Cash salary, directors’ 
fees and consulting 
fees, including 
accruals* 
$ 
 
 
 
Superannuation 
$ 
 
 
Shares (in lieu of cash 
fees) (1) 
$ 
 
 
Options (in lieu of cash 
consulting fees) (1) 
$ 
 
 
 
Total  
$ 
Directors 
 
 
 
 
  
I Tchacos  
338,553 
3,135 
3,750 
51,375 
396,813 
P Fink 
271,947 
- 
1,250 
1,969 
275,166 
E Etienvre 
84,892 
- 
42,188 
- 
127,080 
J Begg  
67,468 
2,765 
16,854 
- 
87,087 
A Childs  
5,275 
580 
- 
- 
5,855 
Other KMP 
 
 
 
 
 
A Sparks  
92,720 
11,944 
14,400 
- 
119,064 
TOTAL 2024 
860,855 
18,424 
78,442 
53,344 
1,011,065 
 
There were no performance-related payments made during the year. Performance hurdles are not attached to 
remuneration options. 
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 45 - 
Share-based Compensation 
 
Shares: 
The Company’s Directors’ Share Plan (Salary Sacrifice), allows for shares to be issued on a quarterly basis according to the 
Directors’ fees owing to each of the Directors at that time, at an issue price of no less than the volume weighted average 
sale price of Shares sold on ASX during the 90 days prior to the expiration of the corresponding calendar quarter in which 
the Directors’ fees were incurred. The shares are issued after Shareholder approval. 
 
The following shares were granted as equity compensation benefits (in lieu of cash remuneration) to Directors during the 
year.  
 
Date Issued 
Number of Shares 
Value-based on 
90-Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
287,914 
19,002 
31/12/2024 
23/05/2025 
675,484 
17,933 
31/03/2025 
04/08/2025 
574,282 
16,654 
30/06/2025 
30/10/2025 
316,667 
9,500 
30/09/2025 
  
1,854,347 
63,089 
  
Issued Subsequent to Year End 
  
  
  
04/02/2026 
1,428,962 
40,240 
31/12/2025 
 
Summarised as: 
 
Director 
2025 
Number of Shares 
2025 
$ 
Ian Tchacos 
151,788 
5,000 
Paul Fink 
151,788 
5,000 
Edouard Etienvre 
1,186,603 
40,304 
John Begg 
364,168 
12,785 
Dave Gilbert 
- 
- 
Issued during the year 
1,854,347 
63,089 
 
The following shares were granted as equity compensation benefits (in lieu of cash remuneration) to other KMPs (Amanda 
Sparks) during the year.  
 
Date Issued 
Number of Shares 
Value based on 
90 Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
72,727 
4,800 
31/12/2024 
23/05/2025 
184,615 
4,800 
31/03/2025 
04/08/2025 
165,517 
4,800 
30/06/2025 
30/10/2025 
160,000 
4,800 
30/09/2025 
  
582,859 
19,200 
  
Issued Subsequent to Year End 
  
  
  
04/02/2026 
177,778 
4,800 
31/12/2025 
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 46 - 
Options: 
 
The Executive Directors may also elect, subject to Shareholder approval, to reduce their cash consulting fees in lieu of 
Options in accordance with the Company’s Performance Rights and Option Plan. The Options are issued on a quarterly 
basis according to the consulting fees owing to each of the Directors at that time, using a deemed price of no less than the 
volume weighted average sale price of Shares sold on ASX during the 90 days prior to the expiration of the corresponding 
calendar quarter in which the consulting fees were incurred. 
 
The following options were granted as equity compensation benefits (in lieu of cash remuneration) to Directors during the 
year.  
 
 
Date Issued 
Number of Options 
Value based on 
90 Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
345,880 
22,828 
31/12/2024 
23/05/2025 
1,036,658 
26,953 
31/03/2025 
04/08/2025 
1,005,387 
29,156 
30/06/2025 
30/10/2025 
1,095,312 
32,860 
30/09/2025 
  
3,483,237 
111,797 
  
Issued Subsequent to Year End 
 
 
  
04/02/2026 
1,098,957 
29,672 
31/12/2025 
 
Summarised as: 
 
Director 
2025 
Number of Options 
2025 
$ 
Ian Tchacos 
2,223,827 
71,062 
Paul Fink 
1,259,410 
40,735 
Issued during the year 
3,483,237 
111,797 
 
No other options were granted as equity compensation benefits to Directors and other Key Management Personnel.    
 
Shares issued to Key Management Personnel on exercise of compensation options 
 
During the year to 31 December 2025, 1,571,402 compensation options were exercised by Directors or other Key 
Management Personnel (2024: 1,684,225 options).  A summary of options exercised by Directors is as follows: 
 
 
Number 
Exercise Price 
Ian Tchacos  
  
  
Unlisted Options  
1,072,605 
Nil cents 
Paul Fink 
 
 
Unlisted Options  
498,797  
Nil cents 
Total exercised  
1,571,402 
  
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 47 - 
E. EQUITY HOLDINGS AND MOVEMENTS DURING THE YEAR 
 
(a) Shareholdings of Key Management Personnel 
 
  
Balance at  
beginning of 
the year 
 
Options 
exercised 
 
Granted as 
remuneration 
At 
appointment 
/ Resignation 
Balance at  
end of the 
year 
Directors 
  
  
  
  
  
I Tchacos 
12,435,652 
1,072,605 
151,788 
- 
13,660,045 
P Fink 
11,527,660 
498,797 
151,788 
- 
12,178,245 
E Etienvre 
5,260,535 
- 
1,186,603 
- 
6,447,138 
J Begg 
529,285 
- 
364,168 
(893,453) 
- 
D Gilbert 
- 
- 
- 
941,259 
941,259 
Other KMPs 
 
 
 
 
 
A Sparks 
4,312,551 
- 
582,859 
- 
4,895,410 
 
34,065,683 
1,571,402 
2,437,206 
47,806 
38,122,097 
 
(b) Option holdings of Key Management Personnel   
 
 
Balance at 
beginning of 
the year 
 
Granted as 
remuneration 
 
Options 
exercised 
 
Loan Note 
Options 
 
Options 
expired 
At 
appointment 
/ Resignation 
Balance at 
end of the 
year 
Exercisable 
Directors 
  
  
  
  
  
 
  
  
I Tchacos 
3,385,088 
2,223,827 
(1,072,605) 
- 
- 
- 
4,536,310 
4,536,310 
P Fink 
- 
1,259,410 
(498,797) 
- 
- 
- 
760,613 
760,613 
E Etienvre 
- 
- 
- 
- 
- 
- 
- 
- 
D Gilbert 
- 
- 
- 
- 
- 
- 
- 
- 
J Begg 
690,476 
- 
- 
- 
- 
(690,476) 
- 
- 
Other KMPs 
 
 
 
 
 
 
 
 
A Sparks 
1,572,857 
- 
- 
2,000,000 
(1,430,000) 
- 
2,142,857 
2,142,857 
 
5,648,421 
3,483,237 
(1,571,402) 
2,000,000 
(1,430,000) 
(690,476) 
7,439,780 
7,439,780 
 
F. OTHER TRANSACTIONS WITH KEY MANAGEMENT PERSONNEL 
 
There were no other transactions with key management personnel during the year. 
 
G. USE OF REMUNERATION CONSULTANTS 
 
No remuneration consultants were engaged by ADX during the year. 
 
H. VOTING OF SHAREHOLDERS AT LAST YEAR’S ANNUAL GENERAL MEETING 
 
The Company received more than 96.5% of “yes” votes on its Remuneration Report for the 2024 year. The Company did 
not receive any specific feedback at the AGM or throughout the year on its remuneration practices. 
 
END OF THE AUDITED REMUNERATION REPORT 
 
 
 

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 48 - 
SUBSEQUENT EVENTS 
 
Equity Issues in Lieu of Remuneration 
On 4 February 2026, ADX issued the following shares and options. These amounts were accrued in the 31 December 2025 
financial statements: 
 
a. 
511,575 shares issued pursuant to ADX’ Directors’ Share Plan, approved by Shareholders on 22 May 2025. The shares 
were issued to directors in consideration of remuneration elected to be paid in shares for the quarter ended 31 
December 2025 ($13,812).  
 
b. 
4,486,319 shares issued to ADX’s Company Secretaries and consultants in consideration of remuneration elected to 
be paid in shares for the quarter ended 31 December 2025 ($127,363).  
 
c. 
1,098,957 Options granted to Directors Ian Tchacos and Paul Fink, as approved by Shareholders on 22 May 2025. The 
options were granted in consideration of consultancy fees remuneration elected to be paid in options for the quarter 
ended 31 December 2024 (value $29,672). The options have a nil exercise price and expire on 31 January 2030. 
 
d. 
1,064,801 shares issued pursuant to ADX’ Directors’ Share Plan, approved by Shareholders on 15 January 2026. The 
shares were issued to a director in consideration of remuneration elected to be paid in shares for the period to 31 
December 2025 ($30,702).  
 
Loan Note Variations 
On 10 March 2026, ADX announced that it had entered into deeds of variation with the Loan Note holders in relation to 
15 Loan Notes of A$ 50,000 each totalling A$ 750,000 (Loan Notes).  
 
Ten (10) Loan Notes of A$ 50,000 each (A$ 500,000 in aggregate) will be repaid on the repayment date of 31 March 2026. 
 
The variation to the Loan Note terms provides funding flexibility to ADX allowing it to utilise its current cash to fund its 
planned asset development program. 
 
Under the revised terms, the repayment period has been extended to 30 September 2027. The revised terms for the Loan 
Notes are summarised as follows:  
 
Loan Note A 
Loan Note B 
Total Loan Notes 
Face Value of Each Loan Note 
$50,000 
$50,000 
$50,000 
Number of Loan Notes Issued 
4 
11 
15 
Total Loans aggregate amount 
$200,000 
$550,000 
$750,000 
Loan Repayment Date 
30 September 2027 
30 September 2027 
30 September 2027 
Interest Rate per annum (payable 
quarterly in arrears) 
10% 
14% 
10-14% 
Free Attaching Unlisted Options 
with an Exercise Price of $0.045, 
expiring 31 May 2028 – Per Loan 
Note. 
Subject 
to 
Shareholder 
approval. 
1,000,000  
per Loan Note 
(4,000,000 in Total) 
900,000  
per Loan Note 
(9,900,000 in Total) 
13,900,000  
in Total 
 
Placement Raising A$ 4.4 million 
On 13 March 2026, ADX advised it had raised A$4.4 million (before costs) via the issue of 162,962,963 new fully paid ordinary 
shares at an issue price of A$0.027 per share. One (1) free-attaching unlisted option will be issued for every two (2) Placement 
Shares to be issued upon Shareholder approval at an upcoming Shareholder Meeting expected to be held in late May 2026. 
The exercise price of the Placement Options is A$0.0405 with an expiry date to be 24 months after issue (estimated to be 31 
May 2028). 
  
There are no other matters or circumstances that have arisen since 31 December 2025 that have or may significantly affect 
the operations, results, or state of affairs of the Group in future years.  

ADX ENERGY LTD 
DIRECTORS’ REPORT 
__________________________________________________________________________________________________ 
- 49 - 
CORPORATE GOVERNANCE 
 
The Directors of the Company support and adhere to the principles of corporate governance, recognising the need for the 
highest standard of corporate behaviour and accountability. Please refer to the Company’s website for details of corporate 
governance policies: 
http://adx-energy.com/en/investors/corporate-governance.php 
 
AUDIT INDEPENDENCE AND NON-AUDIT SERVICES 
Auditor’s independence - section 307C 
The Auditor’s Independence Declaration is included on page 50 of this report. 
Non-Audit Services 
There were no non-audit services provided during the year.   
 
 
 
Signed in accordance with a resolution of the Directors. 
 
 
 
Ian Tchacos 
Executive Chairman 
Date: 30 March 2026 

In.Corp Audit & Assurance Pty Ltd
ABN 14 129 769 151
Level 1
6-10 O’Connell Street 
SYDNEY  NSW  2000
Suite 11, Level 1
4 Ventnor Avenue
WEST PERTH  WA  6005
GPO BOX 542
SYDNEY  NSW 2001
T    +61 2 8999 1199
E    team@incorpadvisory.au
W   incorpadvisory.au
To the directors of ADX Energy Ltd:
AUDITOR’S INDEPENDENCE DECLARATION UNDER SECTION 
307C OF THE CORPORATIONS ACT 2001
In.Corp Audit & Assurance Pty Ltd 
Graham Webb
Director
30 March 2026
As lead auditor of the audit of ADX Energy Ltd for the year ended 
31 December 2025, I declare that, to the best of my knowledge and 
belief, there have been:
•
no contraventions of the auditor independence requirements of the 
Corporations Act 2001 in relation to the audit; and
•
no contraventions of any applicable code of professional conduct in 
relation to the audit.
This declaration is in respect of ADX Energy Ltd and the entities it 
controlled during the year.
Liability limited by a scheme approved under Professional Standards Legislation 
50

ADX ENERGY LTD 
DIRECTORS’ DECLARATION 
__________________________________________________________________________________________________ 
- 51 - 
 
 
1. 
In the opinion of the directors: 
 
a) The financial statements and notes are in accordance with the Corporations Act 2001, including: 
 
i) 
giving a true and fair view of the Group’s financial position as at 31 December 2025 and of its performance 
for the year then ended; and 
 
ii) 
complying with Australian Accounting Standards (including the Australian Accounting Interpretations) and 
the Corporations Regulations 2001; and 
 
iii) complying with International Financial Reporting Standards (IFRS) as stated in Note 1 of the financial 
statements;  
 
iv) the information disclosed in the consolidated entity disclosure statement is true and correct; and 
 
b) there are reasonable grounds to believe that the Company will be able to pay its debts as and when they become 
due and payable. 
 
2. 
This declaration has been made after receiving the declarations required to be made to the directors in accordance 
with Section 295A of the Corporations Act 2001 for the year ended 31 December 2025. 
 
 
This declaration is signed in accordance with a resolution of the Board of Directors. 
 
 
 
 
 
Ian Tchacos 
Executive Chairman 
 
Date: 30 March 2026 
 

ADX ENERGY LTD 
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME 
FOR THE YEAR ENDED 31 DECEMBER 2025 
__________________________________________________________________________________________________ 
- 52 - 
 
 
Consolidated 
 
 
Year ended 
31 December 
2025 
Year ended 
31 December 
2024 
 
Note 
$ 
$ 
Operating revenue 
 2 
10,793,239 
10,676,046 
Cost of sales 
 2 
(13,253,831) 
(11,750,803) 
Gross (loss)/profit  
  
(2,460,592) 
(1,074,757) 
 
  
 
 
Other income 
2  
863,740 
1,286,358 
Other Expenses: 
  
 
 
Administration, staff and corporate expenses,  
net of recoveries from projects (including share-based payments) 
 2 
(4,606,306) 
(3,417,336) 
Exploration expensed 
 
(3,700,937) 
(2,266,393) 
Restoration expenses – changes in abandonment provision 
14 
(616,135) 
(408,657) 
Dry well costs 
  
- 
(146,014) 
Impairment of capitalised appraisal costs  
9(a) 
(2,062,978) 
- 
Finance costs 
2 
(482,888) 
(421,474) 
Loss on disposal of plant and equipment 
 
- 
(19,298) 
Total other expenses 
 
(11,469,244) 
(6,679,172) 
Loss before income tax  
 
(13,066,096) 
(6,467,571) 
 
 
 
 
Income tax (expense)/benefit 
4 
(902) 
(1,558,795) 
LOSS AFTER INCOME TAX  
 
 
(13,066,998) 
(8,026,366) 
 
 
 
 
Loss is attributable to: 
 
 
 
Owners of ADX Energy Ltd 
 
(11,793,113) 
(7,867,532) 
Non-controlling interest 
17 
(1,273,885) 
(158,834) 
 
 
(13,066,998) 
(8,026,366) 
Other comprehensive income 
 
 
 
Items that may be reclassified subsequently to profit or loss: 
 
 
 
Exchange differences on translation of foreign operations 
 
1,212,587 
275,771 
Other comprehensive income for the year, net of tax 
 
1,212,587 
275,771 
TOTAL COMPREHENSIVE INCOME FOR THE YEAR  
 
(11,854,411) 
(7,750,595) 
 
 
 
 
Total comprehensive income is attributable to: 
 
 
 
Owners of ADX Energy Ltd 
 
(11,325,462) 
(7,440,917) 
Non-Controlling Interest 
 
(528,949) 
(309,678) 
 
 
(11,854,411) 
(7,750,595) 
 
 
 
 
Earnings per share for loss attributable to the ordinary equity 
holders of the Company: 
 
Cents Per 
Share 
Cents Per 
Share 
Basic loss per share  
5 
(1.98) 
(1.52) 
The above consolidated statement of profit or loss and other comprehensive income should be read in conjunction with 
the accompanying notes. 

ADX ENERGY LTD 
CONSOLIDATED STATEMENT OF FINANCIAL POSITION 
AS AT 31 DECEMBER 2025 
__________________________________________________________________________________________________ 
- 53 - 
 
 
Consolidated 
 
 
31 December  
2025 
31 December  
2024 
 
Note 
$ 
$ 
ASSETS 
 
 
 
Current Assets 
 
 
 
Cash and cash equivalents 
6 
4,758,239 
9,081,597 
Trade and other receivables 
7 
2,086,862 
3,457,664 
Inventories 
8 
2,862,749 
2,898,333 
Total Current Assets 
 
9,707,850 
15,437,594 
 
 
 
 
Non-Current Assets 
 
 
 
Other receivables 
7 
1,240,007 
1,142,417 
Oil and gas properties 
9 
31,766,212 
33,570,401 
Right of use assets 
10 
1,058,448 
1,122,392 
Total Non-Current Assets 
 
34,064,667 
35,835,210 
Total Assets 
 
43,772,517 
51,272,804 
 
 
 
 
LIABILITIES 
 
 
 
Current Liabilities 
 
 
 
Trade and other payables 
11 
3,463,200 
4,869,630 
Borrowings 
12 
1,659,183 
1,890,571 
Lease liabilities – right of use assets 
13 
125,833 
113,626 
Provisions 
14 
495,233 
307,398 
Total Current Liabilities 
 
5,743,449 
7,181,225 
 
 
 
 
Non-Current Liabilities 
 
 
 
Other payables 
11 
267,334 
- 
Lease liabilities – right of use assets 
13  
977,225 
1,035,614 
Provisions 
14 
21,991,416 
20,318,163 
Total Non-Current Liabilities 
 
23,235,975 
21,353,777 
Total Liabilities 
 
28,979,424 
28,535,002 
Net Assets 
 
14,793,093 
22,737,802 
 
 
 
 
Equity 
 
 
 
Issued capital 
15 
108,798,087 
105,161,657 
Reserves 
16 
2,198,181 
5,914,610 
Accumulated losses 
 
(103,476,640) 
(96,140,879) 
Capital and reserves attributable to owners of ADX Energy Ltd 
 
7,519,628 
14,935,388 
Non-controlling interests 
17 
7,273,465 
7,802,414 
Total Equity 
 
14,793,093 
22,737,802 
The above consolidated statement of financial position should be read in conjunction with the accompanying 
notes.

ADX ENERGY LTD 
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY 
FOR THE YEAR ENDED 31 DECEMBER 2025 
__________________________________________________________________________________________________ 
- 54 - 
 
Issued  
Capital 
 
 
Reserves 
 
Accumulated 
Losses 
Non-
Controlling 
Interest 
 
Total  
Equity 
$ 
$ 
$ 
$ 
$ 
 
 
 
 
 
At 1 January 2024 
90,503,290 
5,399,490 
(88,273,347) 
8,112,092 
15,741,525 
 
 
 
 
 
 
Loss for the year 
- 
- 
(7,867,532) 
(158,834) 
(8,026,366) 
Other comprehensive income 
- 
426,615 
- 
(150,844) 
275,771 
Total comprehensive income for the year, 
net of tax 
- 
426,615 
(7,867,532) 
(309,678) 
(7,750,595) 
Transactions with owners in their capacity 
as owners: 
 
 
 
 
 
Issue of share capital 
15,483,509 
- 
- 
- 
15,483,509 
Costs of issue of share capital 
(825,142) 
- 
- 
- 
(825,142) 
Share based payments – options 
- 
88,505 
- 
- 
88,505 
  
14,658,367 
88,505 
- 
- 
14,746,872 
As at 31 December 2024 
105,161,657 
5,914,610 
(96,140,879) 
7,802,414 
22,737,802 
 
 
 
 
 
At 1 January 2025 
105,161,657 
5,914,610 
(96,140,879) 
7,802,414 
22,737,802 
 
 
 
 
 
Loss for the year 
- 
- 
(11,793,113) 
(1,273,885) 
(13,066,998) 
Other comprehensive income 
- 
467,651 
- 
744,936 
1,212,587 
Total comprehensive income for the year, 
net of tax 
- 
467,651 
(11,793,113) 
(528,949) 
(11,854,411) 
Transactions with owners in their capacity 
as owners: 
 
 
 
 
 
Issue of share capital 
3,852,887 
- 
- 
- 
3,852,887 
Costs of issue of share capital 
(216,457) 
- 
- 
- 
(216,457) 
Options lapsed and transferred to 
accumulated losses 
 
- 
 
(4,457,352) 
 
4,457,352 
 
- 
 
- 
Share based payments – options 
- 
273,272 
- 
- 
273,272 
 
3,636,430 
(4,184,080) 
4,457,352 
- 
3,909,702 
As at 31 December 2025 
108,798,087 
2,198,181 
(103,476,640) 
7,273,465 
14,793,093 
 
 
The above consolidated statement of changes in equity should be read in conjunction with the accompanying 
notes. 

ADX ENERGY LTD 
CONSOLIDATED STATEMENT OF CASH FLOWS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
__________________________________________________________________________________________________ 
- 55 - 
 
 
 
 
 
Consolidated 
 
 
Year ended 
31 Dec 2025 
Year ended 
31 Dec 2024 
 
Note 
 
 
Cash flows from operating activities 
 
 
 
Receipts in the ordinary course of activities 
 
12,422,868 
14,130,408 
Payments to suppliers and employees, including for 
exploration expensed 
 
(15,822,163) 
(16,053,026) 
Interest received 
 
105,863 
186,680 
Interest paid 
 
(185,621) 
(169,713) 
Income taxes refunded 
 
- 
139,582 
Net cash flows from/(used in) operating activities 
6(i) 
(3,479,053) 
(1,766,069) 
 
 
 
 
Cash flows from investing activities 
 
 
 
Payments for oil and gas properties  
 
(4,133,827) 
(27,721,502) 
Payments for oil and gas properties - 
appraisal/development 
 
- 
(84,561) 
Receipts from farmouts/partners  
 
1,019,961 
17,783,940 
Repayment of overcalls to partners  
 
(474,401) 
- 
Other payments 
 
- 
(283,841) 
Net cash flows from/(used in) investing activities 
 
(3,588,267) 
(10,305,964) 
 
 
 
 
Cash flows from financing activities 
 
 
 
Proceeds from issue of shares 
 
3,500,000 
13,500,000 
Proceeds from the exercise of options 
 
- 
1,298,211 
Payment of share issue costs 
 
(216,456) 
(825,119) 
Repayment of loan notes 
 
(250,000) 
- 
Repayment of bank loans 
 
- 
(619,214) 
Advance from shareholder in subsidiary Danube 
Petroleum 
 
267,334 
- 
Payment of lease liabilities (right of use assets) 
 
(166,421) 
(156,011) 
Insurance funding repayments 
 
(587,389) 
(159,924) 
Net cash flows from financing activities 
 
2,547,068 
13,037,943 
 
 
 
 
Net increase/(decrease) in cash and cash equivalents held 
 
(4,520,252) 
965,910 
Net foreign exchange differences 
 
196,894 
108,246 
Opening cash and cash equivalents brought forward 
 
9,081,597 
8,007,441 
Closing cash and cash equivalents at the end of the year 
6 
4,758,239 
9,081,597 
 
The above consolidated statement of cash flows should be read in conjunction with the accompanying notes.

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 56 - 
NOTE 1 –MATERIAL ACCOUNTING POLICY INFORMATION 
 
(i) 
Basis of Preparation 
The financial report is a general-purpose financial report, which has been prepared in accordance with the 
requirements of the Corporations Act 2001, Australian Accounting Standards and authoritative pronouncements of 
the Australian Accounting Standards Board. The financial report has also been prepared on a historical cost basis.  
ADX Energy Ltd is a for-profit entity for the purpose of preparing the financial statements. 
 
The financial report is presented in Australian dollars, which is the group’s presentation currency. 
 
Functional and presentation currency 
The functional currency of the parent entity is Australian Dollars. ADX has identified Australian dollars as its 
functional currency on the basis that all fundraising is in Australian dollars (AUD), and loans to subsidiary companies 
are made from Australian dollars. 
 
ADX’s subsidiaries have the following functional currencies: 
 
AuDAX Energy Srl – EUR 
Bull Petroleum Pty Ltd – AUD 
Terra Energy Limited – GBP 
ADX VIE GmbH – EUR 
Danube Petroleum Limited – GBP 
ADX Energy Panonia Srl – EUR 
Kathari Energia Limited – GBP 
Kathari Energia GmbH – EUR 
 
The presentation currency of the Group is Australian dollars. 
 
Going Concern 
 
The financial statements have been prepared on the basis that the Group will continue to meet its commitments 
and can therefore continue normal business activities and realise assets and settle liabilities in the ordinary course 
of business.  
 
As a producer in Austria, the Group expects to generate positive cash flows, however with a focus on exploration 
and development, the Group may need additional cashflows to finance these activities. The Group incurred a net 
loss of $13,066,998 for the year ended 31 December 2025 and had a net cash outflow from operating activities of 
$3,479,053. These conditions indicate a material uncertainty that may cast significant doubt about the Group’s 
ability to continue as a going concern and therefore it may be unable to realise its assets and discharge its liabilities 
in the normal course of business. 
 
The ability of the Group to continue as a going concern may require additional capital fundraising, farmouts of 
projects or other financing opportunities. During the year, ADX successfully raised A$3.5 million (before costs) under 
a placement, and subsequent to year end ADX raised $4.4 million (before costs) under a placement. The Directors 
believe that the Group will continue as a going concern and has the ability to raise additional funds if required. As 
a result, the financial information has been prepared on a going concern basis. However, should fundraising, 
farmouts or any alternative financing opportunities be unsuccessful, the Group may not be able to continue as a 
going concern. No adjustments have been made relating to the recoverability and classification of liabilities that 
might be necessary should the Group not continue as a going concern.  
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 57 - 
NOTE 1 – MATERIAL ACCOUNTING POLICY INFORMATION – continued 
 
(ii) 
Statement of Compliance 
The financial report complies with Australian Accounting Standards and International Financial Reporting Standards 
(IFRS). 
 
(iii) 
Adoption of new and revised standards 
Early adoption of accounting standards 
The Group has not elected to apply any pronouncements before their operative date in the annual reporting year 
beginning 1 January 2025. 
 
New and amended standards adopted by the Group 
There were no material new or amended standards implemented that had a material impact on the financial 
statements during the year. 
 
(iv) 
Significant Accounting Estimates and Judgements 
 
Significant accounting judgements 
In the process of applying the Group’s accounting policies, management has made the following judgments, apart 
from those involving estimations, which have the most significant effect on the amounts recognised in the financial 
statements. 
 
Significant accounting estimates and assumptions 
The carrying amounts of certain assets and liabilities are often determined based on estimates and assumptions of 
future events. The key estimates and assumptions that have a significant risk of causing a material adjustment to 
the carrying amounts of certain assets and liabilities within the next annual reporting year are: 
 
Share-based payment transactions 
The Group measures the cost of equity-settled transactions by reference to the fair value of the equity instruments 
at the date at which they are granted. The fair value is determined using the value of the services, or a Black-Scholes 
option pricing model. 
 
Commitments - Exploration 
The Group has certain minimum exploration commitments to maintain its right of tenure of its permits. These 
commitments require estimates of the cost to perform exploration work required under these permits.   
 
Deferred Appraisal Costs 
The Group capitalises acquisition expenditure and appraisal costs relating to its permits where it is considered likely 
to be recoverable or where the activities have not reached a stage which permits a reasonable assessment of the 
existence of reserves. While there are certain areas of interest from which no reserves have been extracted, the 
Directors are of the continued belief that such expenditure should not be written off since exploration activities in 
such areas have not yet concluded.  
 
Impairment of Oil and Gas Properties 
For oil and gas properties, the expected future cash flow estimation is based on a number of factors, variables and 
assumptions, the most important of which are estimates of reserves and resources, future production profiles, 
commodity prices, costs and foreign exchange rates. These estimates may impact any impairment calculations. 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 58 - 
NOTE 1 – MATERIAL ACCOUNTING POLICY INFORMATION - continued 
 
(iv) Significant Accounting Estimates and Judgements - continued 
 
Provision for Restoration and Rehabilitation 
Obligations associated with exploration, development and production assets are recognised when the Group has a 
present obligation, the future sacrifice of the economic benefits is probable, and the provision can be measured 
reliably. The determination of the provision requires significant judgement in terms of the best estimate of the costs 
of performing the work required, the timing of the cash flows and the appropriate discount rate. A change in any, 
or a combination of, the key assumptions used to determine the provision could have a material impact on the 
carrying value of the provision. 
 
On an ongoing basis, the restoration will be remeasured in line with the changes in the time value of money 
(recognised as an expense and an increase in the provision), and additional disturbances recognised as additions to 
the provision. The amount recognised as a provision is the best estimate of the consideration required to settle the 
present obligation at the end of the reporting period, taking into account the risks and uncertainties surrounding 
the obligation. When a provision is measured using the cash flows estimated to settle the present obligation, its 
carrying amount is the present value of those cash flows (where the effect of the time value of money is material). 
Asset retirement obligation costs will be incurred by the Group at the end of the operating life of some of the 
Group’s facilities and properties. The Group assesses its asset retirement obligations provision at each reporting 
date. The ultimate asset retirement obligations costs are uncertain and cost estimates can vary in response to many 
factors, including changes to relevant legal requirements, the emergence of new restoration techniques or 
experience at other production sites. The expected timing, extent and amount of expense can also change. 
Therefore, significant estimates and assumptions are made in determining the provision for asset retirement 
obligations. As a result, there could be significant adjustments to the provisions established which would affect 
future financial results. The provision at the reporting date represents management’s best estimate of the present 
value of the future asset retirement obligations costs required. 
 
(v) 
Foreign currency translation 
The presentation currency of the Group is Australian Dollars.  The functional currency of ADX Energy Ltd is Australian 
Dollars.  ADX’s subsidiaries have the following functional currencies: 
 
Danube Petroleum Limited – GBP 
AuDAX Energy Srl – EUR 
Bull Petroleum Pty Ltd – AUD 
ADX VIE GmbH – EUR 
Terra Energy Limited – GBP 
ADX Energy Panonia Srl – EUR 
Kathari Energia Limited – GBP 
Kathari Energia GmbH – EUR 
 
Transactions in foreign currencies are initially recorded in the functional currency at the exchange rates ruling at the 
date of the transaction. Monetary assets and liabilities denominated in foreign currencies are converted at the rate 
of exchange ruling at the balance sheet date. 
 
As at the reporting date the assets and liabilities of the subsidiaries are translated into the presentation currency of 
ADX Energy Ltd at the rate of exchange ruling at the balance sheet date and the income statements are translated 
at the weighted average exchange rates for the year. 
 
The exchange differences arising on the retranslation are taken directly to a separate component of equity. On 
disposal of a foreign entity, the deferred cumulative amount recognised in equity relating to that particular foreign 
operation is recognised in the income statement. 
 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 59 - 
NOTE 2 –INCOME AND EXPENSES 
 
 
 
 
Revenue 
 
Revenue is recognised when or as the Group transfers control of goods or services to a customer at the amount to 
which the Group expects to be entitled. If the consideration promised includes a variable component, the Group 
estimates the expected consideration for the estimated impact of the variable component at the point of recognition 
and re-estimated at every reporting period. Revenue from the sale of oil and gas is recognised and measured in the 
accounting period in which the goods and/or services are provided based on the amount of the transaction price 
allocated to the performance obligations. The performance obligation is the supply of oil and gas over the contractual 
term; the units of supply represent a series of distinct goods that are substantially the same with the same pattern of 
transfer to the customer. The performance obligation is considered to be satisfied as the customer receives the supply 
through the pipeline, based on the units delivered. Hence revenue is recognised at a point in time. 
 
Exploration, evaluation and appraisal expenditure 
Exploration expenditure is expensed to the profit or loss statement as and when it is incurred and included as part of 
cash flows from operating activities.   
 
Evaluation/appraisal and development expenditure is capitalised to the Statement of Financial Position as oil and gas 
properties. Evaluation/appraisal is deemed to be activities undertaken following a discovery from the beginning of 
appraisal and pre-feasibility studies conducted to assess the technical and commercial viability of extracting a resource 
before moving into the Development phase. The criteria for carrying forward the costs are: 
- Such costs are expected to be recouped through successful development and exploitation of the area of interest, 
or alternatively by its sale; or 
- Evaluation activities in the area of interest that have not yet reached a state which permits a reasonable assessment 
of the existence or otherwise of economically recoverable reserves and active and significant operations in, or in 
relation to, the area are continuing. 
 
Costs carried forward in respect of an area of interest which is abandoned are written off in the year in which the 
abandonment decision is made. 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
Note 
$ 
$ 
OPERATING REVENUE 
 
 
 
Oil sales 
 
9,885,692 
9,624,357 
Gas sales 
 
612,811 
512,467 
 
 
10,498,503 
10,136,824 
Hedging gains/(losses), net 
 
3,621 
152,616 
Other operating revenue (including reimbursements) 
 
291,115 
386,606 
 
 
10,793,239 
10,676,046 
COST OF GOODS SOLD 
 
 
 
Operating costs 
 
9,018,295 
8,332,138 
Royalties 
 
740,353 
679,919 
Depreciation  
 
3,316,581 
2,384,011 
Amortisation of asset retirement obligation assets 
 
248,139 
276,150 
Partner share of Anshof operations 
25 
(69,537) 
78,585 
 
 
13,253,831 
11,750,803 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 60 - 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
Note 
$ 
$ 
NOTE 2 –INCOME AND EXPENSES - continued 
 
 
 
OTHER INCOME: 
 
 
 
Income from partners /farmouts - cost recoveries 
 
625,155 
1,033,694 
Interest revenue 
 
158,504 
186,681 
Other 
 
80,081 
65,983 
  
 
863,740 
1,286,358 
 
OTHER EXPENSES – Administration and corporate expenses: 
 
 
 
Share-based payments – in lieu of cash remuneration 
 
             444,315  
387,116 
Share-based payments – performance rights and options 
 
                         -   
386,666 
  
3(a) 
             444,315  
773,782 
Less: prior period accrued share-based payments 
 
         (113,346)  
(482,884) 
Add: accrued share-based payments issued/to be issued after the 
period end 
 
             383,673  
280,128 
Net foreign exchange (gains)/losses 
 
             314,276  
(346,700) 
Short-term lease expenses 
 
               45,377  
46,326 
Depreciation – right of use assets 
 
             135,889  
126,835 
Defined contribution superannuation/pension expense 
 
             204,809  
188,922 
Other administration, personnel and corporate expenses 
 
          4,143,936  
5,810,586 
  
 
          5,558,929  
6,396,995 
Less: project cost recoveries 
 
 (952,623)  
(2,979,659) 
  
 
   4,606,306  
3,417,336 
OTHER EXPENSES – Finance costs: 
 
 
 
Interest expense 
 
184,996 
168,578 
Accretion 
 
118,084 
98,327 
Right of use assets – interest  
 
56,352 
56,501 
Share-based payments – borrowing costs 
3(a) 
122,497 
96,933 
Other bank fees and borrowing costs 
  
959 
1,135 
  
 
482,888 
421,474 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 61 - 
NOTE 3 – EQUITY-BASED PAYMENTS  
 
Equity settled transactions: 
The Group provides benefits to executive directors, employees and consultants of the Group in the form of share-based 
payments, whereby those individuals render services in exchange for shares or rights over shares (equity-settled 
transactions). When provided, the cost of these equity-settled transactions with these individuals is measured by reference 
to the fair value of the equity instruments at the date at which they are granted.  
 
The fair value of options is determined either using the Black-Scholes option pricing model or in the case of consulting by 
directors, the number of options granted will be determined by dividing the Directors’ consulting fees that the Company 
has agreed to pay to the Related Parties via equity using a deemed price based on the volume weighted average sale price 
of Shares sold on ASX during the 90 days prior to the expiration of the corresponding calendar quarter in which the 
Directors’ consulting fees were incurred. In valuing equity-settled transactions, no account is taken of any performance 
conditions other than conditions linked to the price of the shares of ADX Energy Ltd (market conditions), if applicable. 
 
The cost of equity-settled transactions is recognised, together with a corresponding increase in equity, over the period in 
which the performance and/or service conditions are fulfilled, ending on the date on which the relevant individuals become 
fully entitled to the award (the vesting date). The cumulative expense recognised for equity-settled transactions at each 
reporting date until the vesting date reflects: 
(i) 
the grant date fair value of the award;  
(ii) 
the extent to which the vesting period has expired; and 
(iii) 
the number of awards that, in the opinion of the Directors of the Company, will ultimately vest taking into 
account such factors as the likelihood of non-market performance conditions being met. 
This opinion is formed based on the best available information at the reporting date. 
No expense is recognised for awards that do not ultimately vest, except for awards where vesting is only conditional upon 
a market condition. If an equity-settled award is cancelled, it is treated as if it had vested on the date of cancellation, and 
any expense not yet recognised for the award is recognised immediately. If an equity-settled award is forfeited, any expense 
previously recognised for the award is reversed. However, if a new award is substituted for a cancelled award and 
designated as a replacement award on the date that it is granted, the cancelled and new award are treated as if they were 
a modification of the original award, as described in the previous paragraph. 
 
(a) Value of equity-based payments in the financial statements 
 
 
Consolidated 
 
 
Note 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
 
$ 
$ 
Expensed in the profit and loss: 
 
 
 
Share-based payments – Employee Performance Rights and Options 3(b)(iv) 
- 
21,100 
Share-based payments – Employee Shares 
3(b)(iv) 
- 
365,566 
Options issued in lieu of fees: 
 
 
 
Share-based payments – Options Issued to Directors  
3(b)(ii) 
111,797 
67,406 
 
 
111,797 
454,072 
Shares issued in lieu of fees: 
 
 
 
Share-based payments – Shares Issued to Directors  
3(b)(i) 
63,089 
87,010 
Share-based payments – Shares Issued to other KMPs 
3(b)(iii) 
19,200 
19,200 
Share-based payments – Shares Issued to consultants 
3(b)(iii) 
250,229 
213,500 
  
 
444,315 
773,782 
  
Options issued to loan note holders in 2025- Share-based 
payments – Borrowing costs 
 
 
 
122,497 
 
96,933 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 62 - 
NOTE 3 – EQUITY-BASED PAYMENTS – continued 
  
 (b) Summary of remuneration equity-based payments granted during the year: 
 
(i) 
Shares granted to Directors pursuant to ADX’ Directors’ Share Plan, approved by Shareholders on 22 May 
2025 as follows:  
 
 
Date Issued 
Number of 
Shares 
Value-based on 90-
Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
287,914 
19,002 
31/12/2024 
23/05/2025 
675,484 
17,933 
31/03/2025 
04/08/2025 
574,282 
16,654 
30/06/2025 
30/10/2025 
316,667 
9,500 
30/09/2025 
  
1,854,347 
63,089 
  
Issued Subsequent to 
Year End 
  
  
  
04/02/2026 
1,428,962 
40,240 
31/12/2025 
 
Summarised as: 
 
Director 
2025 
Number of 
Shares 
2025 
Remuneration 
value $ 
2024 
Number of 
Shares 
2024 
Remuneration 
value $ 
Ian Tchacos 
151,788 
5,000 
43,988 
5,000 
Paul Fink 
151,788 
5,000 
12,376 
1,250 
Edouard Etienvre 
1,186,603 
40,304 
564,200 
63,906 
John Begg 
364,168 
12,785 
148,333 
16,854 
Dave Gilbert 
- 
- 
- 
- 
Total 
1,854,347 
63,089 
768,897 
87,010 
(ii) 
Options granted to Directors pursuant to ADXs’ Performance Rights and Option Plan, approved by 
Shareholders on 22 May 2025 as follows: 
 
 
Date Issued 
Number of 
Options 
Value based on 90 
Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
345,880 
22,828 
31/12/2024 
23/05/2025 
1,036,658 
26,953 
31/03/2025 
04/08/2025 
1,005,387 
29,156 
30/06/2025 
30/10/2025 
1,095,312 
32,860 
30/09/2025 
  
3,483,237 
111,797 
  
Issued Subsequent to 
Year End 
 
 
  
04/02/2026 
1,098,957 
29,672 
31/12/2025 
 
Summarised as: 
 
Director 
2025 
Number of 
Options 
2025 
Remuneration 
value $ 
2024 
Number of 
Options 
2024 
Remuneration 
value $ 
Ian Tchacos 
2,223,827 
71,062 
584,021 
65,437 
Paul Fink 
1,259,410 
40,735 
19,492 
1,969 
Issued during the year 
3,483,237 
111,797 
603,513 
67,406 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 63 - 
NOTE 3 – EQUITY-BASED PAYMENTS – continued 
 
(b) 
Summary of remuneration equity-based payments granted during the year - continued: 
 
 
(iii) 
Shares to consultants and company secretaries in lieu of remuneration: 
 
 
Date Issued 
Number of  
Shares 
Value based on 
90 Day VWAP $ 
In lieu of part remuneration for 
the quarter ended 
06/02/2025 
993,070 
70,905 
31/12/2024 
23/05/2025 
2,260,569 
60,021 
31/03/2025 
04/08/2025 
2,404,218 
68,765 
30/06/2025 
30/10/2025 
2,324,580 
69,737 
30/09/2025 
  
7,982,437 
269,428 
  
Issued Subsequent to 
Year End 
 
 
  
04/02/2026 
3,065,637 
85,851 
31/12/2025 
 
Summarised as: 
 
2025 
Number of 
Shares 
2025 
Remuneration 
value $ 
2024 
Number of 
Shares 
2024 
Remuneration 
value $ 
Other KMPs 
 
 
 
 
Amanda Sparks 
582,859  
19,200  
169,918 
19,200 
Consultants 
 
 
 
 
Other consultants 
       7,399,578  
                250,228  
1,897,650 
213,500 
Issued during the year 
7,982,437 
269,428 
2,067,568 
232,700 
 
(iv) 
During the year no other options or performance rights were granted as equity compensation benefits to 
employees or consultants. 
 
(c) Weighted average exercise price 
The following table shows the number and weighted average exercise price (WAEP) of share options granted as 
remuneration share-based payments. 
 
12 Months to  
31 December 
2025 
12 Months to  
31 December 
2025 
12 Months to  
31 December 
2024 
12 Months to  
31 December 
2024 
 
Number 
WAEP $ 
Number 
WAEP $ 
Outstanding at the beginning of the year 
10,235,088 
0.114 
11,240,800 
0.13 
Granted to Directors during the year 
3,483,237 
Nil 
603,513 
Nil 
Granted to employees during the year 
- 
- 
500,000 
0.17 
Lapsed during the year 
(6,350,000) 
0.17 
(425,000) 
0.13 
Exercised during the year 
(1,571,402) 
Nil 
(1,684,225) 
Nil 
Outstanding at the end of the year 
5,796,923 
0.015 
10,235,088 
0.114 
Exercisable at year-end 
5,796,923 
0.015 
10,235,088 
0.114 
 
The weighted average share price for options exercised during the year was $Nil (2024: $Nil). 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 64 - 
NOTE 3 – EQUITY-BASED PAYMENTS – continued 
 
(d) Weighted average fair value 
The weighted average fair value of remuneration equity-based payment options granted during the year was 2025: 
none 
(2024: $0.077). 
  
(e) Range of exercise price  
The range of exercise price for options granted as remuneration share-based payments outstanding at the end of 
the year was $nil to $0.15 (2024: $nil to $0.17). 
 
(f) 
Weighted average remaining contractual life 
The weighted average remaining contractual life of remuneration share-based payment options that were 
outstanding as of the end of the year was 2.47 years (2024: 0.93 years). 
 
NOTE 4 - INCOME TAX EXPENSE 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
 
$ 
$ 
(a) Income Tax Expense 
 
 
 
The reconciliation between tax expense and the product of 
accounting loss before income tax multiplied by the Company’s 
applicable income tax rate is as follows: 
 
 
 
 
 
 
 
Loss for the year before tax 
 
(13,066,096) 
(6,467,571) 
Prima facie income tax (benefit) @ 30%  
 
(3,919,829) 
(1,940,271) 
Tax effect of non-deductible items 
 
2,304,727 
283,379 
Tax rate differential 
 
567,737 
263,413 
Tax rate change – Austria 
 
- 
14,947 
Translation differences 
 
11,907 
(43,543) 
Deferred tax assets not brought to account 
 
1,036,360 
2,980,870 
Income tax expense/(benefit) attributable to operating result 
 
902 
1,558,795 
 
(b)   Deferred tax assets not recognised relate to the following: 
 
 
 
Tax losses 
 
15,750,459 
16,571,766 
 
These deferred tax assets have not been brought to account as it is not 
probable that tax profits will be available against which deductible 
temporary differences can be utilised. 
  
(c) Deferred tax assets and liabilities: 
 
 
 
Deferred tax assets: 
 
  
  
Tax losses - Austria 
 
3,658,505 
3,396,852 
Temporary differences - Other 
 
293,429 
287,172 
Less: Offset Deferred Tax Liabilities: 
 
 
 
Temporary differences - Oil and gas properties, net of JV 
 
(3,693,364) 
(3,414,548) 
Temporary differences - Asset retirement obligations 
 
(14,270) 
(16,534) 
Temporary differences - Other 
 
(244,300) 
(252,942) 
  
 
- 
- 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 65 - 
NOTE 4 - INCOME TAX EXPENSE - continued 
 
  
  
(d)  Franking Credits 
 
The franking account balance at year-end was $nil (2024: $nil). 
 
(e)   Tax Consolidation Legislation 
 
ADX Energy Ltd and its 100% owned Australian subsidiaries have not formed a tax-consolidated group.  
 
 
NOTE 5 - EARNINGS PER SHARE 
 
 
 
Consolidated 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
Cents 
Cents 
Basic loss per share attributable to members of ADX Energy Ltd 
(1.98) 
(1.52) 
 
 
 
 
$ 
$ 
Loss attributable to ordinary equity holders of the Company used in 
calculating: 
 
 
- Basic earnings per share 
(11,793,113) 
(7,867,532) 
  
 
 
 
Number 
of shares 
Number 
of shares 
Weighted average number of ordinary shares outstanding during the year 
used in the calculation of basic earnings per share 
595,319,821   
      517,832,191  
 
Diluted earnings per share is not disclosed because potential ordinary shares, 
being options granted, are not dilutive and their conversion to ordinary 
shares would not demonstrate an inferior view of the earnings performance 
of the Company. 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 66 - 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
NOTE 6 - CASH AND CASH EQUIVALENTS 
 
 
 
 
 
Cash at bank and on hand 
4,758,239 
9,081,597 
 
 
(i) Reconciliation of loss for the period to net cash flows used in operating 
activities 
 
 
Loss after income tax 
(13,066,998) 
(8,026,366) 
Insurance funding payments are classified as financing cash flows 
587,389 
159,924 
Interest expense on ROUA leases classified as financing cash flows 
56,352 
56,501 
Non-Cash Items: 
 
 
Depreciation and amortisation 
3,700,610 
2,786,996 
Restoration expenses – changes in abandonment provision 
616,134 
408,657 
Dry well costs 
- 
146,014 
Impairment of capitalised appraisal costs 
2,062,978 
- 
Foreign exchange losses/(gains)  
314,276 
(346,700) 
Share-based payments expensed  
444,315 
870,715 
Accretion 
118,084 
98,327 
Change in assets and liabilities: 
 
 
(Increase)/decrease in trade and other receivables 
181,864 
120,454 
(Increase)/decrease in inventories 
70,133 
(307,240) 
(Increase)/decrease in deferred tax assets 
- 
1,490,803 
Increase/(decrease) in trade and other payables 
1,310,182 
685,044 
Increase/(decrease) in provisions 
125,628 
90,802 
Net cash flows (used in)/from operating activities 
(3,479,053) 
(1,766,069) 
 
(ii) Non-Cash Financing and Investing Activities 
 
During the year, the Company issued 25,000,000 options to loan note holders ($161,473) and 783,426 ordinary 
shares to an advisor ($20,370) (2024: No non-cash financing or investing activities). Other non-cash operating 
activities consist of shares and options granted in lieu of remuneration are disclosed in note 3. 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 67 - 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
NOTE 7 – TRADE AND OTHER RECEIVABLES 
 
 
 
Current 
 
 
Trade and other debtors 
814,207 
1,271,765 
GST/VAT refundable 
192,397 
1,142,729 
Prepayments 
848,913 
891,915 
 Under/(over) partnership cash calls (net) 
174,853 
99,740 
Cash secured for credit cards 
20,000 
20,000 
Others 
36,492 
31,515 
Total current receivables 
2,086,862 
3,457,664 
 
Information about the impairment of trade and other receivables, their credit quality and the group’s exposure to 
credit risk, foreign currency risk and interest rate risk can be found in note 24. Receivables do not contain past due or 
impaired assets as at 31 December 2025 (2024: none). 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
Non-Current 
 
 
Cash secured for licences and other cash bonds 
1,240,007 
1,142,417 
 
EUR 50,157 (AUD 87,933) is held as security for the Vienna office rental, EUR 26,145 (AUD 45,835) is held as security 
for land rental for the Drill Site Welchau 1, and the remaining EUR 630,999 (AUD 1,106,239) is secured for the Group’s 
AGS licences in Austria. 
 
 
 
NOTE 8 – INVENTORIES 
 
 
 
Inventories include hydrocarbon stocks, consumable supplies and maintenance and drilling spares. Inventories are 
valued at the lower of cost and net realisable value. Cost is determined on a weighted average basis and includes direct 
costs and an appropriate portion of fixed and variable production overheads where applicable. Inventories determined 
to be obsolete or damaged are written down to net realisable value, being the estimated selling price less selling costs. 
 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
Oil and gas inventories 
108,084 
122,980 
Materials and consumables 
2,754,665 
2,775,353 
Total current inventories 
2,862,749 
2,898,333 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 68 - 
NOTE 9 – OIL AND GAS PROPERTIES 
 
 
Oil and gas properties are stated at cost less accumulated depreciation and impairment charges. Oil and gas properties 
include the costs to acquire, construct, install or complete production and infrastructure facilities such as pipelines, 
capitalised borrowing costs, development wells and the estimated cost of dismantling and restoration. Subsequent 
capital costs, including major maintenance, are included in the asset’s carrying amount only when it is probable that 
future economic benefits associated with the item will flow to the Group and the cost of the item can be reliably 
measured. 
 
Oil and gas properties and other plant and equipment are depreciated to their estimated residual values at rates based 
on their expected useful lives with a maximum period of 100 months. All items of oil and gas properties are depreciated 
using the straight-line method over their useful life capped at 100 months. They majority of the Oil and Gas equipment 
is depreciated over 8.3 years. 
 
Impairment: Oil and gas properties are assessed for impairment on a cash-generating unit (CGU) basis. Individual assets 
within a CGU may become impaired if their ongoing use changes or if the benefits to be obtained from ongoing use 
are likely to be less than the carrying value of the individual asset. 
 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
Austria 
 
 
Buildings 
205,971 
236,374 
Undeveloped land 
198,209 
189,251 
Field office fixtures and equipment 
288,985 
281,001 
Plant and machinery 
6,953,275 
6,491,416 
Wells 
6,327,568 
7,846,509 
Retirement obligation assets 
2,012,409 
2,041,522 
Assets under construction 
7,793,961 
6,886,940 
Rights and other intangible assets 
- 
586 
  
23,780,378 
23,973,599 
Romania 
 
 
Appraisal costs  
7,985,834 
9,596,802 
Total oil and gas properties 
31,766,212 
33,570,401 
 
 
 
Reconciliation of the carrying amount of oil and gas assets: 
 
 
 
 
 
Buildings – opening balance 
236,374 
266,833 
Depreciation 
(41,388) 
(38,889) 
Translation differences 
10,985 
8,430 
  
205,971 
236,374 
 
 
 
Undeveloped Land – opening balance 
189,251 
182,913 
Translation differences 
8,958 
6,338 
 
198,209 
189,251 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 69 - 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
NOTE 9 – OIL AND GAS PROPERTIES - continued 
 
 
Field office fixtures and equipment – opening balance 
281,001 
340,222 
Additions 
72,090 
5,654 
Disposals 
- 
(144) 
  Transfers 
- 
11,872 
Depreciation 
(77,027) 
(86,649) 
Translation differences 
12,921 
10,046 
 
288,985 
281,001 
 
 
 
Plant and machinery – opening balance 
6,491,416 
3,511,728 
Additions – net of partner contributions 
1,172,409 
3,082,022 
Disposals/Credit Note 
(98,790) 
(19,987) 
  Transfers 
353,522 
                618,070 
Depreciation 
(1,266,689) 
(814,287) 
Translation differences 
301,407 
113,870 
  
6,953,275 
6,491,416 
 
 
 
Wells – opening balance 
7,846,509 
6,960,443 
Additions – net of partner contributions 
50,045 
1,862,444 
Transfers 
- 
401,656 
Dry well costs expensed 
- 
(146,014) 
Depreciation 
(1,930,866) 
(1,433,807) 
Translation differences 
361,880 
201,787 
 
6,327,568 
7,846,509 
 
 
 
Retirement obligation assets (Austria) – opening balance 
2,041,522 
1,655,805 
Additions 
116,218 
769,618 
   Change of discount rate 
- 
(160,743) 
Amortisation 
(241,730) 
(276,150) 
Translation differences 
96,399 
52,992 
  
2,012,409 
2,041,522 
 
 
 
Assets under construction – opening balance 
6,886,940 
3,072,838 
Additions – net of partner contributions 
934,549 
4,739,226 
Transfers  
(353,522) 
(1,031,598) 
Translation differences 
325,994 
106,474 
  
7,793,961 
6,886,940 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 70 - 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
NOTE 9 – OIL AND GAS PROPERTIES - continued 
 
 
 
 
 
Rights and other intangible assets – an opening balance 
586 
10,807 
Depreciation 
(611) 
(10,378) 
Translation differences 
25 
157 
 
- 
586 
 
 
 
Appraisal costs – Romania – opening balance 
9,596,802 
9,143,998 
Additions  
- 
85,397 
Additions – rehabilitation and restoration provision – note 14 
26,297 
48,544 
Impairment of capitalised appraisal costs – note 9(a) 
(2,062,978) 
- 
Translation differences 
425,713 
318,863 
  
7,985,834 
9,596,802 
(a) Impairment of capitalised appraisal costs 
 
 
Previously capitalised appraisal costs associated with the Parta Exploration License for which the entity had the right 
to explore/develop has expired, and is now not expected to be renewed and any substantive expenditure on further 
evaluation of resources in the specific area is unlikely. 
 
 NOTE 10 – RIGHT OF USE ASSETS 
 
 
 
Non-Current Assets 
 
 
Right of use assets - properties 
1,058,448 
1,122,392 
 
 
 
Reconciliation of the carrying amount of right-of-use assets: 
 
 
 
 
 
Opening balance 
1,122,392 
1,209,783 
   Additions 
18,949 
- 
 Depreciation 
(135,889) 
(126,835) 
 Translation differences 
52,996 
39,444 
  
1,058,448 
1,122,392 
Refer to note 13 for lease liabilities for right-of-use assets. 
 
 
 
NOTE 11 – TRADE AND OTHER PAYABLES 
 
 
 
Current 
 
 
Trade creditors and accruals 
3,439,469 
4,846,233 
Accrued interest payable 
23,731 
23,397 
  
3,463,200 
4,869,630 
Non-Current 
 
 
Advance from shareholder in subsidiary Danube Petroleum 
267,334 
- 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 71 - 
NOTE 12 – BORROWINGS 
 
 
 
Loan Notes 
 
On 10 January 2025, ADX announced that it had entered into deeds of variation with the Loan Note holders in relation 
to 25 Loan Notes of A$ 50,000 each totalling A$ 1.25 million (Loan Notes).  
 
Five (5) Loan Notes of A$ 50,000 each (A$ 250,000 in aggregate) were repaid on the original repayment date of 11 January 
2025. 
 
The variation to the Loan Note terms provides funding flexibility to ADX allowing it to utilise its current cash to fund its 
planned asset development program. 
 
Under the revised terms, the repayment period has been extended to 31 March 2026. The revised terms for the Loan 
Notes are summarised as follows:  
 
 
Loan Note A 
Loan Note B 
Total Loan Notes 
Face Value of Each Loan Note 
$50,000 
$50,000 
$50,000 
Number of Loan Notes Issued 
4 
21 
25 
Total Loans aggregate amount 
$200,000 
$1,050,000 
$1,250,000 
Loan Repayment Date 
31 March 2026 
31 March 2026 
31 March 2026 
Interest Rate per annum (payable quarterly 
in arrears) 
8% 
12% 
8-12% 
Free Attaching Unlisted Options with an 
Exercise Price of $0.05, expiring 31 March 
2026 – Per Loan Note 
500,000  
per Loan Note 
(2,000,000 in Total) 
- 
2,000,000  
in Total 
Free Attaching Unlisted Options with an 
Exercise Price of $0.055, expiring 31 March 
2026 – Per Loan Note  
500,000  
per Loan Note 
(2,000,000 in Total) 
1,000,000  
per Loan Note  
(21,000,000 in Total) 
23,000,000  
in Total 
 
Subsequent to year end, $750,000 of these loan notes were extended to a 30 September 2027 repayment date. 
 
 
 
Consolidated 
 
 
Year Ended 
 31 December 
2025 
Year Ended 
 31 December 
2024 
 
$ 
$ 
Current  
 
 
Loan notes – interest bearing – unsecured 
1,250,000 
1,500,000 
Loan notes – capitalised costs 
(38,976) 
- 
Insurance funding (a) 
448,159 
390,571 
  
1,659,183 
1,890,571 
 
(a)    Insurance funding was provided during the year totalling EUR 378,218 ($649,150) of which $200,991 was repaid 
during 2025, with $448,159 to be repaid in seven equal instalments during 2026, with the final instalment due for 
payment on 31 July 2026. 
 
The Group’s exposure to liquidity and interest rate risk is discussed in Note 24. 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 72 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 13 – LEASE LIABILITIES 
 
 
 
 
Current 
 
 
Right of use assets 
125,833 
113,626 
Non-Current 
 
 
Right of use assets 
977,225 
1,035,614 
 
NOTE 14 – PROVISIONS 
 
 
 
 
 
Current 
 
 
Provision for employee entitlements 
495,233 
307,398 
 
 
 
Non-Current 
 
 
Provision for employee entitlements 
197,245 
259,451 
Provision for asset retirement obligations (ARO) – production assets 
20,733,512 
19,071,099 
Provision for rehabilitation and restoration – Romania 
1,060,659 
987,613 
  
21,991,416 
20,318,163 
 
 
 
Provision for asset retirement obligations (non-current) – opening balance 
19,071,099 
17,144,238 
Additions capitalised to retirement obligations assets – note 9 
116,218 
769,618 
Additions capitalised to assets under construction 
- 
202,544 
Increase in provision - expensed 
616,135 
408,657 
Other reduction 
(93,392) 
- 
Change of discount rate  
6,416 
(160,743) 
Accretion 
118,084 
98,327 
Translation differences 
898,953 
608,458 
 Provision for asset retirement obligations – closing balance 
20,733,512 
19,071,099 
 
 
 
Provision for rehabilitation and restoration – Romania – opening balance 
987,613 
907,620 
Additions capitalised – note 9 
26,297 
48,544 
Translation differences 
46,749 
31,449 
 Provision for rehabilitation and restoration – Romania – closing balance 
1,060,659 
987,613 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 73 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 15 – ISSUED CAPITAL 
 
 
 
 
 
(a) Issued Capital 
 
 
Ordinary shares fully paid 
108,798,087 
105,161,657 
 
(b) Movements in Ordinary Share Capital 
 
 
 
Number of 
Shares 
 
Summary of Movements – Current Year (2025) 
 
Note 
2025 
$ 
573,908,327 Opening Balance as at 1 January 2025 
 
105,161,657 
287,914 Issue of shares to Directors (part remuneration for 12/2024 
quarter) 
3(b) 
19,002 
993,070 Issue of shares to Co Secs and Consultants (part remuneration for 
12/2024 quarter) 
3(b) 
70,905 
783,426 Issue of shares to advisor 
 
20,370 
675,484 Issue of shares to Directors (part remuneration for 3/2025 quarter) 
3(b) 
17,933 
2,260,569 Issue of shares to Co Secs and Consultants (remuneration for 
3/2025 quarter) 
3(b) 
60,021 
1,571,402 Options exercised at $nil 
 
- 
574,282 Issue of shares to Directors (part remuneration for 6/2025 quarter) 
3(b) 
16,654 
2,404,218 Issue of shares to Co Secs and Consultants (remuneration for 
6/2025 quarter) 
3(b) 
68,765 
316,667 Issue of shares to Directors (part remuneration for 9/2025 quarter) 
3(b) 
9,500 
2,324,580 Issue of shares to Co Secs and Consultants (remuneration for 
9/2025 quarter) 
3(b) 
69,737 
134,615,385 Placement at $0.026 
 
3,500,000 
 Costs of shares issued 
 
(216,457) 
720,715,324 Closing Balance as at 31 December 2025 
 
108,798,087 
 
 
Current Year transactions: 
 
Placement Raising A$ 3.5 million 
In November 2025, ADX advised it had raised A$3.5 million (before costs) via the issue of 134,615,385 new fully paid 
ordinary shares at an issue price of A$0.026 per share. One (1) free-attaching unlisted option was issued for every two (2) 
Placement Shares. The exercise price of the Placement Options is A$0.039 with an expiry date of 17 January 2028.  
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 74 - 
NOTE 15 – ISSUED CAPITAL - continued 
 
 
 
 
 
(b) Movements in Ordinary Share Capital – continued 
 
 
 
Number of 
Shares 
 
Summary of Movements – Prior Year (2024) 
 
2024 
$ 
427,865,791 Closing Balance as at 1 January 2024 
 
90,503,290 
214,660 Issue of shares to Directors (part remuneration for 12/2023 
quarter) 
 
22,969 
402,643 Issue of shares to Co Secs and Consultants (remuneration for 
12/2023 quarter) 
 
41,388 
131,547 Issue of shares to Directors (part remuneration for 3/2024 quarter) 
 
20,784 
446,043 Issue of shares to Co Secs and Consultants (remuneration for 
3/2024 quarter) 
 
64,819 
188,501 Issue of shares to Directors (part remuneration for 6/2024 quarter) 
 
19,604 
603,468 Issue of shares to Co Secs and Consultants (remuneration for 
6/2024 quarter) 
 
64,571 
234,189 Issue of shares to Directors (part remuneration for 9/2024 quarter) 
 
23,653 
615,414 Issue of shares to Co Secs and Consultants (remuneration for 
9/2024 quarter) 
 
61,922 
1,684,225 Options exercised at $nil 
 
- 
9,943,337 Options exercised at $0.13 
 
1,292,610 
35,000 Options exercised at $0.16 
 
5,600 
128,571,428 Placement (T1 and T2) at $0.105 
 
13,500,000 
2,972,081 Employee Share Scheme – Shares issued to employees in Vienna 
 
365,566 
- Costs of shares issued - cash 
 
(825,119) 
573,908,327 Closing Balance as at 31 December 2024 
 
105,161,657 
 
 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 75 - 
NOTE 15 – ISSUED CAPITAL - continued 
 
 
 
(c) 
Options on issue at year end 
 
 
 
Number 
Exercise Price 
Expiry Date 
Listed Options  
64,285,731 
15 cents 
08/05/2026 
Total Listed Options  
64,285,731 
  
  
 
 
 
Number 
Exercise Price 
Expiry Date 
Unlisted Options  
              500,000  
17 cents 
31/03/2026 
Unlisted Options  
2,000,000 
5 cents 
31/03/2026 
Unlisted Options  
23,000,000  
5.5 cents 
31/03/2026 
Unlisted Options  
              269,532  
Nil cents 
31/07/2026 
Unlisted Options  
              380,358  
Nil cents 
31/10/2026 
Unlisted Options  
              283,929  
Nil cents 
31/01/2027 
Unlisted Options  
              275,893  
Nil cents 
31/05/2027 
Unlisted Options  
              300,000  
Nil cents 
31/07/2027 
Unlisted Options  
218,750  
Nil cents 
31/10/2027 
Unlisted Options  
              131,425  
Nil cents 
31/01/2028 
Unlisted Options  
              89,003  
Nil cents 
31/05/2028 
Unlisted Options  
196,514  
Nil cents 
31/07/2028 
Unlisted Options  
167,079  
Nil cents 
31/10/2028 
Unlisted Options  
              213,068  
Nil cents 
31/01/2029 
Unlisted Options  
              670,673  
Nil cents 
31/05/2029 
Unlisted Options  
           1,005,387  
Nil cents 
31/07/2029 
Unlisted Options  
           1,095,312  
Nil cents 
31/10/2029 
Total Unlisted Options  
30,796,923 
  
  
 
During the year: 
 
(i) 
3,483,237 unlisted options were granted in lieu of remuneration to Directors Ian Tchacos and Paul Fink.  Refer 
note 3(b)(ii). 
(ii) 
1,571,402 unlisted options were exercised by Directors (exercise price was nil as these were previously granted 
in lieu of remuneration). 
(iii) 
3,000,000 unlisted options with an exercise price of $0.10 lapsed during the year. 
(iv) 
5,150,000 unlisted options with an exercise price of $0.14 lapsed during the year. 
(v) 
6,350,000 unlisted options with an exercise price of $0.17 lapsed during the year. 
(vi) 
2,000,000 unlisted options with an exercise price of $0.05 and 23,000,000 unlisted options with an exercise 
price of $0.055 were issued to Loan Note holders – refer to note 12.  
 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 76 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 16 - RESERVES 
 
 
 
 
 
Share-based payments reserve 
2,542,534 
6,726,614 
Foreign currency translation reserve 
(344,353) 
(812,004) 
 Total reserves 
2,198,181 
5,914,610 
 
 
 
 
 
 
Share-based payments reserve 
 
 
Balance at the beginning of the year 
6,726,614 
6,638,109 
Options granted 
273,272 
88,505 
Options lapsed and transferred to accumulated losses 
(4,457,352) 
- 
Balance at the end of the year 
2,542,534 
6,726,614 
Nature and purpose of the reserve:   
The Share-based payments reserve is used to recognise the fair value of 
options issued but not exercised. 
 
 
 
 
 
Foreign currency translation reserve 
 
 
Balance at the beginning of the year 
(812,004) 
(1,238,619)  
Currency translation differences 
467,651 
426,615 
Balance at the end of the year 
(344,353) 
(812,004) 
 
 
 
Nature and purpose of the reserve:   
The foreign currency translation reserve is used to record exchange 
differences arising from the translation of the financial statements of foreign 
subsidiaries. 
 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 77 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 17 – NON-CONTROLLING INTERESTS 
 
 
 
 
 
Non-Controlling Interests 
7,273,465 
7,802,414 
 
 
 
Movement during the year: 
 
 
Balance at the beginning of the year 
7,802,414 
8,112,092 
Share of loss for the period  
(1,273,885) 
(158,834) 
Share of other comprehensive income 
744,936 
(150,844) 
Balance at the end of the year 
7,273,465 
7,802,414 
 
Non-controlling interests represent Reabold Resources Plc (LSE AIM:RBD) (Reabold) interest held in the Danube group.  
The Danube Group consists of Danube Petroleum Limited (registered in England and Wales) and its wholly owned 
Romanian subsidiary, ADX Energy Panonia Srl. 
 
As at 31 December 2025, Reabold holds a 50.82% interest in Danube (2024: 50.82%). ADX Energy Ltd continues to 
consolidate the Danube Group as it has control via day-to-day management, accounting and two out of three directors 
on the board of Danube Petroleum Limited are directors of ADX Energy Ltd. 
 
Summarised financial information for Danube Petroleum Limited and its 100% owned subsidiary ADX Energy Panonia SRL 
is as follows. The amounts disclosed are before inter-company eliminations: 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
Summarised Statement of Financial Position 
$ 
$ 
Current assets 
15,084 
143,723 
Current liabilities 
(66,684) 
(42,250) 
Current net assets 
(51,600) 
101,473 
 
 
 
Non-current assets 
14,299,079 
16,195,591 
Non-current liabilities 
(1,060,659) 
(987,613) 
Non-current net assets 
13,238,420 
15,207,978 
  
 
 
Net Assets 
13,186,820 
15,309,451 
 
 
 
Summarised Statement of Profit or Loss and Other Comprehensive 
Income 
 
 
Revenue 
 
 
Loss for the period 
(2,506,660) 
(312,541) 
Other comprehensive income 
1,465,833 
(296,821) 
Total comprehensive income 
(1,040,827) 
(609,362) 
 
 
 
Loss allocated to Non-Controlling Interests 
(1,273,885) 
(158,834) 
Other comprehensive income allocated to Non-Controlling Interests 
744,936 
(150,844) 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 78 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 17 – NON-CONTROLLING INTERESTS - continued 
 
 
Summarised Statement of Cash Flows 
 
 
Cash flows from/(used in) operating activities  
(286,248) 
(282,159) 
Cash flows from/(used in)  investing activities 
(94,079) 
(85,397) 
Cash flows from financing activities 
274,739 
(83,696) 
Net foreign exchange differences 
2,914 
3,051 
Net increase/(decrease) in cash and cash equivalents 
(102,674) 
(448,201) 
  
NOTE 18 – DERIVATIVE FINANCIAL INSTRUMENTS 
 
 
 
The Group’s accounting policy for cash flow hedges is as follows:  
 
Cash flow hedges are a derivative or financial instrument designated to hedge the exposure to variability in cash flows 
attributable to a particular risk associated with an asset, liability or forecast transaction.  
 
• Recognition date: At the date the instrument is designated as a hedging instrument.  
• Measurement: Measured at fair value. The fair value of oil derivative contracts is determined by estimating the 
difference between the relevant market prices and the contract price, for the volumes of the derivative contracts. 
• Changes in fair value: Changes in the fair value of derivatives designated as cash flow hedges are recognised directly in 
other comprehensive income and accumulated in equity in the hedging reserve to the extent that the hedge is effective. 
Ineffectiveness is recognised on a cash flow hedge where the cumulative change in the designated component value 
of the hedging instrument exceeds on an absolute basis the change in value of the hedged item attributable to the 
hedged risk. To the extent that the hedge is ineffective, changes in fair value are recognised immediately in the income 
statement within other income or other expenses. Amounts accumulated in equity are transferred to the income 
statement or the statement of financial position, for a non-financial asset, at the same time as the hedged item is 
recognised. When a hedging instrument expires or is sold, terminated or exercised, or when a hedge no longer meets 
the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is 
recognised when the underlying forecast transaction occurs. When a forecast transaction is no longer expected to 
occur, the cumulative gain or loss that was reported in equity is immediately transferred to the income statement.  
 
Hedge effectiveness is determined at the inception of the hedge relationship, and through regular prospective 
assessments to ensure that an economic relationship exists between the hedged item and hedging instrument. The 
Group enters into hedge relationships where the critical terms of the hedging instrument match with the terms of the 
hedged item, and so a qualitative assessment of effectiveness is performed. If changes in circumstances affect the terms 
of the hedged item such that the critical terms no longer match with the critical terms of the hedging instrument, the 
Group uses the hypothetical derivative method to assess effectiveness. 
 
Hedging reserves  
The hedging reserve includes the cash flow hedge reserve and the costs of hedging reserve. The cash flow hedge reserve 
is used to recognise the effective portion of gains or losses on derivatives that are designated and qualify as cash flow 
hedges. The group defers the changes in the forward element of forward contracts and the time value of option contracts 
in the costs of hedging reserve.  
 
On 31 March 2025, ADX executed hedging transactions with Britannic Trading Limited with put and call option 
agreements for 12,000 barrels of oil at a Put Option Brent crude oil price of USD 65.00 per barrel, and a Call Option Brent 
crude oil price of USD 75.20 per barrel for April 2025 to July 2025 inclusive, being 3,000 barrels of oil per month. The 
quantity of hedged oil equated to approximately 100 BOPD during the period. The resulting gain was $3,621 (2024: 
152,616), refer to note 2. As at 31 December 2025, there were no derivative financial instruments in place. 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 79 - 
 
Company 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 19 – PARENT ENTITY INFORMATION 
 
 
 
 
 
Statement of Financial Position information 
 
 
Current assets 
2,759,738 
6,455,793 
Non-current assets 
14,144,583 
15,742,066 
Current liabilities 
(2,124,094) 
(2,652,255) 
Non-current liabilities 
(22,145) 
(20,536) 
Net Assets 
14,758,082 
19,525,068 
  
 
 
Issued capital 
108,798,087 
105,161,657 
Reserves 
2,542,534 
6,726,616 
Accumulated losses 
(96,582,539) 
(92,363,205) 
  
14,758,082 
19,525,068 
Profit and loss information 
 
 
Loss for the year  
(8,676,686) 
(2,828,088) 
Total comprehensive income for the year  
(8,676,686) 
(2,828,088) 
 
Commitments and contingencies 
 
 
There are no commitments or contingencies, including any guarantees entered into by ADX Energy Ltd on behalf of its 
subsidiaries as at year end.  
 
Subsidiaries 
 
 
Name of Controlled Entity 
Class of Share 
Place of 
Incorporation 
% Held by Parent Entity 
 
 
 
31 December 2025 
31 December 2024 
AuDAX Energy Srl  
Ordinary 
Italy 
100% 
100% 
Bull Petroleum Pty Ltd  
Ordinary 
Australia 
100% 
100% 
Terra Energy Limited  
Ordinary 
UK 
100% 
100% 
ADX VIE GmbH  
Ordinary 
Austria 
Held 100% by Terra 
Energy Limited  
Held 100% by Terra 
Energy Limited  
Danube Petroleum Limited  
Ordinary 
UK 
49.18% 
49.18% 
ADX Energy Panonia Srl  
Ordinary 
Romania 
Held 100% by 
Danube Petroleum 
Limited  
Held 100% by 
Danube Petroleum 
Limited  
Kathari Energia Limited  
Ordinary 
UK 
100% 
100% 
Kathari Energia GmbH  
Ordinary 
Austria 
 Held 100% by 
Kathari Energia 
Limited 
 Held 100% by 
Kathari Energia 
Limited 
 
Refer to note 17, non-controlling interests, for details on Danube Petroleum Limited Group. 
 
 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 80 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 20 – COMMITMENTS AND CONTINGENCIES 
 
 
 
(a) 
Short term leases (non-cancellable): 
 
 
Within one year 
9,404 
14,309 
Later than one year, not later than five years 
- 
- 
Balance at the end of the year 
9,404 
14,309 
Short term lease commitments are primarily for the office lease in Romania. 
 
(b) 
Commitments and Contingencies for Oil and Gas Properties 
In order to maintain current rights of tenure to exploration licences the Company may be compelled to perform minimum 
exploration activities to meet requirements specified by the relevant governments. These expenditure commitments may 
be varied as a result of renegotiations, relinquishments, farm-outs or sales. Land leases in lower Austria are held by an 
unrelated party and reimbursed by ADX. These amount to approximately EUR 51,500 per annum (A$ 90,000) and comprise 
approximately 95 individual lease contracts, and have no end date or termination date. Land leases in upper Austria 
(primarily government-owned) amount to approximately EUR 37,500 per annum (A$ 66,000). 
  
Capital commitments 
The Group entered an agreement during October 2025 for a Combined Heat & Power (CHP) unit, which is to be installed 
at the Anshof production facility for Anshof operations in upper Austria. The first of thirty six monthly instalments of EUR 
8,100 per month is  expected to commence in April 2026 with one further payment to complete the purchase. The total 
commitment is EUR 303,200. 
 
Data Usage Agreement – Upper Austria 
In December 2019, ADX entered into a Data Usage Agreement (DUA) with RAG Austria AG (RAG) for access to RAG 
Exploration Data (including 3650 km2 of modern 3D seismic) in the Molasse Basin, in Upper Austria. Under the DUA, ADX 
has exclusive access to 3D and 2D seismic and geological data from RAG for oil and gas activities in its exploration, 
production and gas storage licences (AGS Licences). ADX has agreed to pay RAG a licence fee as a function of the active 
AGS licence areas for up to 5 years, and beyond should ADX continue to hold an active AGS License. Currently the 
commitment is approximately EUR 18,000 per quarter. The fee paid to RAG under the DUA in 2025 was EUR 68,728.  
 
Upper Austria Exploration (AGS) Licences – Austria 
ADX executed concession agreements for exploration, production and gas storage in Upper Austria (Upper Austria AGS) 
on the 8th of January 2021 between ADX and Federal Ministry responsible for Mining (Ministry) on behalf of the Republic 
of Austria. Effective on 1st April 2022, ADX successfully was awarded licence area additions for the Upper Austria AGS 
Licence areas ADX-AT-I and ADX-AT-II resulting in a total area of 1022 km2. In order to secure the AGS Licences and the 
related work program, ADX VIE GmbH has put in place a bank guarantee for an amount of EUR 1,203,422 (of which EUR 
630,999 is secured by cash). The total term for the AGS Licences including the newly awarded extension area is 16 years 
without any relinquishment and the first 4-year firm period commenced on 1st January 2021. ADX had a 3 well exploration 
drilling commitment during the first 4-year firm period. The financial and drilling commitment during first 4-year term was 
exceed with the drilling of three exploration wells (two in the ADX-AT-2 licence and one in the ADX-AT-1 licence) as well as 
the drilling of an appraisal well in the ADX-AT-II licence. In 2024 ADX made an application for a licence extension for a 
further 4-year period. The extension application has been confirmed by the Ministry for the second 4-year firm period 
commencing on 1st January 2025. The work program obligation is one exploration well in the ADX-AT-I licence and one 
exploration well in the ADX-AT-II licence for the period 2025 to 2028.   
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 81 - 
NOTE 20 – COMMITMENTS AND CONTINGENCIES - continued 
 
 
 
Anshof Field Area in Upper Austria – MND Partnership Agreement 
On 7 August 2023, ADX and MND entered into an Energy Investment Agreement (EIA) in relation to the appraisal and 
development of the Anshof Field Area The total firm investment payment obligations under the EIA by MND are EUR 5.28 
million for the drilling, completion and tie-in of the Anshof-2 and Anshof-1 wells. Under the terms of EIA, MND has secured 
30% economic interest in the Anshof Field Area by the payment of past costs as well as the payment of firm investment 
obligations. To date MND has funded the drilling of the Anshof-2 well and the subsequent Anshof-2A. MND has not yet 
funded the drilling of second well in accordance with the EIA. 
 
Iecea Mare Production Licence 
In 2018, ADX acquired a 100% equity interest in the Iecea Mare Production licence (Licence). ADX has committed to pay a 
5% royalty from the licence seller Amromco Energy for production from wells located within Licence. The current 
production licence is valid until November 2034 and extensions are possible. The licence does not carry any commitments, 
but an annual work-program has to be agreed with the Romanian government (via NAMR), which then becomes a 
commitment. ADX estimates the annual cost for such activities may be approximately $50,000 per annum.  
 
 
d363 C.R-.AX licence – Italy 
In August 2025, ADX Energy Ltd via its 100% subsidiary Audax Energy S.r.l (Audax)., was formally awarded the C.R150.AU 
Exploration Permit (“Permit”) in the Sicily Channel, by the Italian Ministry of Environment and Energy Security (Ministry). 
AUDAX is the Permit Operator and holds a 100% equity interest. The Permit is valid for an initial exploration period of six 
(6) years with up to two (2), three (3) year renewal periods. In the event of a discovery, an exploitation concession has a 
term of twenty (20) years, which may be extended for a further ten (10) years. The Permit is exclusive to Audax and 
assignable. 
 
In accordance with the revised regulatory framework focusing on gas exploration, the licence acceptance included the 
confirmation that Audax would commit to the maximum licence area of 346 Km2. 
 
The final work program submitted by ADX in January 2025 was as follows: 
 
• 
Within 12 months of the licence award, the purchase, reprocessing and interpretation of approximately 150 km of 2D 
seismic (a financial commitment of EUR 70,000 for the purchase and EUR 40,000 for seismic reprocessing, including 
specialised amplitude versus offset (“AVO”) analysis). 
 
 
Within 36 months of the licence award, if the interpretation of the seismic lines purchased requires a more detailed 
definition of the prospects, a new 2D seismic survey of 150 km will be acquired or a 3D seismic survey of 60 km2 will 
be acquired (a financial commitment of EUR 500,000). 
 
• 
Within 48 months of the license award, if the interpretation of the seismic data leads to the identification of an 
economically viable prospect, an exploratory well will be drilled to a depth of approx. 2,500 m total depth (a financial 
commitment of EUR 20,000,0001). 
 
1 Audax can drop the licence after each licence year. In licence year four, Audax can elect to drill a the well or drop the 
licence. 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 82 - 
NOTE 20 – COMMITMENTS AND CONTINGENCIES - continued 
 
 
 
Other contingencies 
 
Parta licence – Romania 
Danube Petroleum Limited (49.2% owned by ADX Energy Ltd) held the Parta Exploration Licence in Romania through its 
subsidiary ADX Energy Panonia SRL (Panonia). The licence lapsed following the expiry of Exploration Phase 1 on 3 December 
2022 and the Romanian Regulatory Authority’s refusal to grant an extension. Panonia was unable to complete the Phase 
1 work program due to regulatory delays, land access restrictions, and resistance from landowners, which prevented 
seismic acquisition and drilling in the most prospective areas. 
 
In October 2025, the Romanian Regulatory Authority issued invoices totalling EUR 4.2 million for alleged unperformed 
work commitments. ADX (on behalf of Panonia) is formally disputing the invoices, citing significant expenditure already 
incurred, regulatory delays, and operational access constraints. A court hearing is yet to be held.  
 
The Directors believe, based on legal advice and the circumstances surrounding the regulatory delays and access 
restrictions, the claim issued by the Romanian Regulatory Authority will not be successful and therefore no provision has 
been recognised. ADX also reserves its rights to pursue counterclaims for losses exceeding EUR 10 million.  
 
NOTE 21 – RELATED PARTY DISCLOSURES 
 
(a) Compensation of Key Management Personnel 
 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
Short-term employment benefits 
952,311 
860,855 
Post-employment benefits 
18,442 
18,424 
Share-based payments  
146,845 
131,786 
Total compensation of key management personnel 
1,117,598 
1,011,065 
 
(b) Other transactions and balances with Key Management Personnel 
 
i) 
Director Ian Tchacos, through Warroorah Pty Ltd ATF Tchacos Fund and Ian Tchacos, provides office premises to 
ADX Energy Ltd. The key terms are gross monthly rental of $2,233.34 per month, monthly estimated outgoings of 
$433.57 per month (both excluding GST), on 3 month rolling terms. Rent reviews are undertaken on 1 July of each 
year based on CPI. These terms are considered normal commercial rates. Rental paid, including outgoings, for the 
year ended 31 December 2025, totalled $17,515.84 (2024: $30,996), excluding GST. 
 
ii) In July 2023, Company Secretary, Amanda Sparks, through the A & A Sparks S/F A/C and her spouse Anthony 
Sparks, provided $100,000 loan notes to ADX Energy Ltd (refer to note 12). The interest rate was 12%. These terms 
were considered normal commercial rates. During the year, interest of $12,000 (2024: $12,033) was paid or 
accrued. 
 
(c) Transactions with Other Related Parties 
 
In July 2023, Company Secretary, Peter Ironside, through Ironside Pty Ltd , provided $200,000 
loan notes to ADX Energy Ltd (refer to note 12). The interest rate was 8% for $100,000 and 12% for $100,000. These 
terms were considered normal commercial rates. During the year, interest of $19,999.89 (2024: $20,055) was paid or 
accrued. 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 83 - 
 
Consolidated 
 
31 December  
2025 
31 December  
2024 
 
$ 
$ 
NOTE 22 – AUDITOR’S REMUNERATION 
 
 
 
Amount paid or due and payable to the auditor for: 
 
 
Audit and review of the financial statements 
58,000 
54,500 
Other services 
- 
- 
Total remuneration of auditors 
58,000 
54,500 
 
 
NOTE 23 – SEGMENT INFORMATION 
 
 
 
Reportable Operating Segments Identified  
 
For management purposes, the Group has organised its operating segments into three reportable segments as follows:  
 
• 
Sicily Channel Offshore Exploration and Evaluation Segment: this segment includes assets and activities that are 
associated with oil and gas exploration offshore Italy. 
• 
Romania Exploration and Appraisal/Development Segment: this segment includes assets and activities that are 
associated with oil and gas exploration, appraisal and development in that region, and include the costs if the 
parent entity, Danube Petroleum Limited. 
• 
Austria Production, Appraisal/Development and Exploration Segment: this segment includes assets and activities 
that are associated with oil and gas operations in that region. All oil sales are made to a single customer in Austria, 
and all gas sales are made to a single customer in Austria. 
 
The following items are not allocated to segments as they are not considered part of core operations of any segment 
and are managed on a Group basis. 
 
• 
Interest revenue 
• 
Foreign currency gains/(losses) 
• 
Corporate costs 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 84 - 
NOTE 23 – SEGMENT INFORMATION - continued 
 
 
 
Operating Segments 
Sicily 
Channel  
$ 
Romania 
 
$ 
Austria 
(Production) 
$ 
Total 
Operations  
$ 
Year ended 31 December 2025 
 
 
 
 
Revenue and income 
- 
- 
10,793,239 
10,793,239 
Total segment revenue 
 
 
 
10,793,239 
Result 
 
 
 
 
Segment result after tax 
(223,997) 
(2,498,429) 
(8,111,389) 
(10,833,815) 
Reconciliation of segment profit after tax to net loss 
after tax: 
 
 
 
 
Unallocated revenue and income 
 
 
 
158,504 
Foreign currency gains/(losses) 
 
 
 
(314,276) 
Unallocated expenditure 
 
 
 
(2,076,509) 
Net loss after tax 
 
 
 
(13,066,096) 
 
 
 
 
 
Depreciation, amortisation and impairment included in 
segment result 
 
- 
 
- 
 
3,628,923 
 
3,628,923 
 
 
 
 
 
Assets 
 
 
 
 
Segment assets 
78,731 
7,992,141 
31,844,590 
39,915,462 
Reconciliation of segment assets: 
 
 
 
 
Unallocated cash 
 
 
 
2,624,252 
Other  
 
 
 
1,232,803 
Total assets 
 
 
 
43,772,517 
 
 
 
 
 
Liabilities 
 
 
 
 
Segment liabilities 
(14,438) 
(1,127,343) 
(25,484,542) 
(26,626,323) 
Reconciliation of segment liabilities: 
 
 
 
 
Unallocated liabilities 
 
 
 
(2,353,100) 
Total liabilities 
 
 
 
(28,979,423) 
 
 
 
 
 
Capital expenditure for the year (net of partner 
contributions) 
 
 
 
 
Segment capital expenditure – oil and gas assets 
- 
- 
2,347,327 
2,347,327 
Reconciliation of capital expenditure: 
 
 
 
 
Unallocated additions 
 
 
 
- 
Total capital expenditure 
 
 
 
2,347,327 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 85 - 
 
NOTE 23 – SEGMENT INFORMATION - continued 
 
 
 
 
 
Operating Segments 
Sicily 
Channel  
$ 
Romania 
 
$ 
Austria 
(Production) 
$ 
Total 
Operations  
$ 
Year ended 31 December 2024 
 
 
 
 
Revenue and income 
- 
- 
10,676,046 
10,676,046 
Total segment revenue 
 
 
 
10,676,046 
Result 
 
 
 
 
Segment result after tax 
(55,501) 
(267,260) 
(5,321,839) 
(5,644,600) 
Reconciliation of segment profit after tax to net loss 
after tax: 
 
 
 
 
Unallocated revenue and income 
 
 
 
186,680 
Foreign currency gains/(losses) 
 
 
 
(346,700) 
Unallocated expenditure 
 
 
 
(2,221,746) 
Net loss after tax 
 
 
 
(8,026,366) 
 
 
 
 
 
Depreciation, amortisation and impairment included in 
segment result 
 
- 
 
- 
 
2,786,997 
 
2,786,997 
 
 
 
 
 
Assets 
 
 
 
 
Segment assets 
22,536 
9,695,111 
35,024,068 
44,741,715 
Reconciliation of segment assets: 
 
 
 
 
Unallocated cash 
 
 
 
6,387,965 
Other  
 
 
 
143,124 
Total assets 
 
 
 
51,272,804 
 
 
 
 
 
Liabilities 
 
 
 
 
Segment liabilities 
(3,838) 
(1,018,204) 
(24,840,262) 
(25,862,304) 
Reconciliation of segment liabilities: 
 
 
 
 
Unallocated liabilities 
 
 
 
(2,672,698) 
Total liabilities 
 
 
 
(28,535,002) 
 
 
 
 
 
Capital expenditure for the year (net of partner 
contributions) 
 
 
 
 
Segment capital expenditure – oil and gas assets 
- 
85,397 
14,095,285 
14,180,682 
Reconciliation of capital expenditure: 
 
 
 
 
Unallocated additions 
 
 
 
- 
Total capital expenditure 
 
 
 
14,180,682 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 86 - 
NOTE 24 – FINANCIAL RISK MANAGEMENT  
 
The Group is exposed to market risk (commodity, currency and interest rate risks), credit risk and liquidity risk. The Group’s 
overall risk management program focuses on the unpredictability of financial markets and seeks to minimise potential 
adverse effects on the financial performance of the Group. The Group uses different methods to measure different types 
of risk to which it is exposed. ADX’ Board of Directors (Board) is responsible for approving ADX’s policies on risk oversight 
and management and ensuring management has developed and implemented effective risk management and internal 
controls. Risk management is carried out by the senior executives under these policies which have been approved by the 
Board. Management identifies, evaluates and, if necessary, hedges financial risks. 
 
Commodity price risk 
During the year the Group continued generating revenue from its fields in Austria. With this oil and gas production and 
revenue, the group is exposed to the Brent Benchmark crude oil price and European gas price fluctuations. Exposure to oil 
and gas price risk is measured by monitoring the Group’s forecast financial position and cash flows with various 
assumptions. This analysis is regularly performed. Commodity prices’ hedging may be undertaken where the Board of 
Directors determines that a hedging strategy is appropriate to mitigate potential periods of adverse movements in 
commodity prices and protect forward cash flows to meet commitments. This will be balanced against the desire to expose 
shareholders to oil price upside and the reliability of production forecasts.  
 
As at 31 December 2025, no derivative financial instruments were in place. 
 
The hedging program is designed to provide certainty of cash flows during a period of expected ongoing volatility. 
 
Currency risk 
The Group’s source currency for the majority of costs is in Euro (EUR). Operating revenue is invoiced in EUR but is indexed 
to Dated Brent price which is denominated in United States Dollar (USD). Currency risk arises where the value of a financial 
instrument or monetary item fluctuates due to changes in foreign currency exchange rates. The exposure to currency risk 
is measured using sensitivity analysis and cash flow forecasting.  
 
The Board has formed the view that in the ordinary course of business it would not be beneficial for the Group to purchase 
forward contracts or other derivative financial instruments to hedge any currency risk. Currency risk for operating revenue 
is hedged via hedging of the commodity as necessary (see section ‘Commodity price risk’).  
 
During the year the company undertook capital raising activities via the issue of new shares on the ASX. These capital 
raisings are priced and received in AUD. Over the time period of a capital raising there is some short-term exposure to 
movements in the AUD to EUR exchange rates as part of the funds are used in Europe. At year end, management has 
assessed that the entity’s exposure to foreign exchange movements is immaterial due to revenues and costs primarily 
in EUR and therefore no further analysis is provided. The Group manages its foreign exchange risk by constantly 
reviewing its exposure to commitments payable in foreign currency and ensuring appropriate cash balances are 
maintained in EUR and AUD, to meet current operational commitments. 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 87 - 
NOTE 24 – FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES - continued 
 
Interest rate risk 
At balance date the Group’s exposure to market risk for changes in interest rates relates primarily to the Company’s 
borrowings. The Group constantly analyses its exposure to interest rates, with consideration given to potential renewal of 
existing positions, the mix of fixed and variable interest rates and the period to which deposits may be fixed. 
 
Given the very low interest rates for variable borrowings, the interest rate risk is considered immaterial. 
 
 
31 December 
2025 
$ 
31 December 
2024 
$ 
Borrowings - fixed rate 
1,250,000 
1,890,571 
Total 
1,250,000 
1,890,571 
  
Liquidity risk 
Liquidity risk is the risk that Group will encounter difficulty in meeting obligations associated with financial liabilities that 
are settled by delivering cash or another financial asset. The Group manages liquidity risk by continuously monitoring 
forecast and actual cash flows with scenario analysis. As at reporting date the Group had sufficient cash reserves to meet 
its current requirements.  
 
The contractual maturity analysis of payables as at year end are: 
  
Total 
 
$ 
Less than 1 Year 
 
$ 
Between 1-5 
Years 
$ 
31 December 2025 
 
 
 
Trade and other payables 
3,463,199 
3,463,199 
- 
Borrowings  
1,659,183 
1,659,183 
- 
Total 
5,122,382 
5,122,382 
- 
  
31 December 2024 
 
 
 
Trade and other payables 
4,869,630  
4,869,630 
 -  
Borrowings 
1,890,571 
  1,890,571 
                   -    
Total 
6,760,201  
  6,760,201 
                 -    
  
Credit risk 
Credit risk refers to the risk that a counter party will default on its contractual obligations resulting in financial loss to the 
Group. The Group has adopted the policy of dealing with creditworthy counterparties and obtaining sufficient collateral or 
other security where appropriate, as a means of mitigating the risk of financial loss from defaults. The Group measures 
credit risk on a fair value basis. 
Significant cash deposits are with institutions with a minimum credit rating of A+ (or equivalent) as determined by a 
reputable credit rating agency e.g. Standard & Poor.   
 
The Group has only one customer for operating revenue being a significant company in Austria. Revenue is received 
monthly and hence the credit risk deemed very low. The customer is Austria’s largest energy storage company, and one of 
Europe’s leading gas storage facility operators 
 
The Group does not have any other significant credit risk exposure to a single counterparty or any group of counterparties 
having similar characteristics. 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 88 - 
NOTE 25 -PARTNERSHIPS – ANSHOF EOCENE OIL PROJECT 
 
Under ADX’s upper Austria AGS licence, ADX must retain 100% ownership of the licence and is required to act without 
restrictions from partners. ADX is permitted to establish a partnership with other parties to allow an economic participation 
within the licence area.  
 
The ADX Group has an Anshof Partnership with MND Austria a.s. (MND). ADX is the operator and holds an 70% economic 
interest in the Anshof Discovery Area, with MND holding a 30% economic interest, other than the Anshof-2A well where 
ADX holds a 60% interest and MND has a 40% economic interest.  
 
As ADX provides the MND with an interest in the operating result of Anshof, ADX recognises 100% of all sales revenue and 
100% of expenses associated with the operations and also recognises an expense representing the MND’s share of 
operating results.  
 
Consolidated 
 
31 December  
2025 
31 December 
2024 
 
$ 
$ 
Partner Share of Operations (included as cost of goods sold) 
 
 
Partners share of Anshof operations profit/(loss) – refer to note 2 
(69,537) 
78,585 
 
 
 
Operations – Anshof 
 
 
Sales revenue 
3,674,291 
3,044,672 
Cost of Goods Sold (excluding depreciation and amortisation) 
(3,890,850) 
(2,919,359) 
 
(216,559) 
125,313 
Profit/(loss) allocated: 
 
 
ADX VIE GmbH  (100% subsidiary of ADX Group) 
(132,317) 
46,728 
Kathari Energia GmbH (100% subsidiary of ADX Group) 
(14,704) 
- 
MND Austria a.s. 
(89,006) 
43,956 
Xstate Resources Limited 
19,468 
34,629 
 
(216,559) 
125,313 
 
 
 

ADX ENERGY LTD 
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 
FOR THE YEAR ENDED 31 DECEMBER 2025 
_________________________________________________________________________________________________ 
 
- 89 - 
NOTE 26 - SUBSEQUENT EVENTS 
 
Equity Issues in Lieu of Remuneration 
On 4 February 2026, ADX issued the following shares and options. These amounts were accrued in the 31 December 2025 
financial statements: 
 
a. 
511,575 shares issued pursuant to ADX’ Directors’ Share Plan, approved by Shareholders on 22 May 2025. The shares 
were issued to directors in consideration of remuneration elected to be paid in shares for the quarter ended 31 
December 2025 ($13,812).  
 
b. 
4,486,319 shares issued to ADX’s Company Secretaries and consultants in consideration of remuneration elected to 
be paid in shares for the quarter ended 31 December 2025 ($127,363).  
 
c. 
1,098,957 Options granted to Directors Ian Tchacos and Paul Fink, as approved by Shareholders on 22 May 2025. The 
options were granted in consideration of consultancy fees remuneration elected to be paid in options for the quarter 
ended 31 December 2024 (value $29,672). The options have a nil exercise price and expire on 31 January 2030. 
 
d. 
1,064,801 shares issued pursuant to ADX’ Directors’ Share Plan, approved by Shareholders on 15 January 2026. The 
shares were issued to a director in consideration of remuneration elected to be paid in shares for the period to 31 
December 2025 ($30,702).  
 
Loan Note Variations 
On 10 March 2026, ADX announced that it had entered into deeds of variation with the Loan Note holders in relation to 
15 Loan Notes of A$ 50,000 each totalling A$ 750,000 (Loan Notes).  Ten (10) Loan Notes of A$ 50,000 each (A$ 500,000 
in aggregate) will be repaid on the repayment date of 31 March 2026. 
 
The variation to the Loan Note terms provides funding flexibility to ADX allowing it to utilise its current cash to fund its 
planned asset development program. 
 
Under the revised terms, the repayment period has been extended to 30 September 2027. The revised terms for the Loan 
Notes are summarised as follows:  
 
Loan Note A 
Loan Note B 
Total Loan Notes 
Face Value of Each Loan Note 
$50,000 
$50,000 
$50,000 
Number of Loan Notes Issued 
4 
11 
15 
Total Loans aggregate amount 
$200,000 
$550,000 
$750,000 
Loan Repayment Date 
30 September 2027 
30 September 2027 
30 September 2027 
Interest Rate per annum (payable 
quarterly in arrears) 
10% 
14% 
10-14% 
Free Attaching Unlisted Options 
with an Exercise Price of $0.045, 
expiring 31 May 2028 – Per Loan 
Note. 
Subject 
to 
Shareholder 
approval. 
1,000,000  
per Loan Note 
(4,000,000 in Total) 
900,000  
per Loan Note 
(9,900,000 in Total) 
13,900,000  
in Total 
 
Placement Raising A$ 4.4 million 
On 13 March 2026, ADX advised it had raised A$4.4 million (before costs) via the issue of 162,962,963 new fully paid ordinary 
shares at an issue price of A$0.027 per share. One (1) free-attaching unlisted option will be issued for every two (2) Placement 
Shares to be issued upon Shareholder approval at an upcoming Shareholder Meeting expected to be held in late May 2026. 
The exercise price of the Placement Options is A$0.0405 with an expiry date to be 24 months after issue (estimated to be 31 
May 2028). 
  
There are no other matters or circumstances that have arisen since 31 December 2025 that have or may significantly affect 
the operations, results, or state of affairs of the Group in future years.  

ADX ENERGY LTD 
CONSOLIDATED ENTITY DISCLOSURE STATEMENT 
AS AT 31 DECEMBER 2025 
__________________________________________________________________________________________________ 
 
- 90 - 
 
 
 
 
 
 
 
Name of Entity 
 
 
 
 
 
 
 
Entity Type 
 
 
 
 
 
 
Country of 
Incorporation 
 
 
 
 
 
 
% 
Ownership 
 
 
 
 
 
 
Australian 
Resident 
Foreign 
Jurisdiction 
in 
which the entity 
is a resident for 
tax 
purposes 
(according 
to 
the law of the 
foreign 
jurisdiction) 
ADX Energy Ltd 
Body Corporate 
Australia 
Parent 
Yes 
N/A 
Bull Petroleum Pty Ltd 
Body Corporate 
Australia 
100% 
Yes 
N/A 
AuDAX Energy Srl 
Body Corporate 
Italy 
100% 
No 
Italy 
Terra Energy Limited 
Body Corporate 
United Kingdom 
100% 
No 
United Kingdom 
ADX VIE GmbH 
Body Corporate 
Austria 
100% 
No 
Austria 
Kathari Energia Limited 
Body Corporate 
United Kingdom 
100% 
No 
United Kingdom 
Kathari Energia GmbH 
Body Corporate 
Austria 
100% 
No 
Austria 
Danube Petroleum Limited 
Body Corporate 
United Kingdom 
49.18% 
No 
United Kingdom 
ADX Energy Panonia Srl 
Body Corporate 
Romania 
100% owned 
by 
Danube 
Petroleum 
Limited 
No 
Romania 
 
 
 

In.Corp Audit & Assurance Pty Ltd
ABN 14 129 769 151
Level 1
6-10 O’Connell Street 
SYDNEY  NSW  2000
Suite 11, Level 1
4 Ventnor Avenue
WEST PERTH  WA  6005
GPO BOX 542
SYDNEY  NSW 2001
T    +61 2 8999 1199
E    team@incorpadvisory.au
W   incorpadvisory.au
To the members of ADX Energy Ltd
Opinion
We have audited the financial report of ADX Energy Ltd (“the
Company”) and its controlled entities (“the Group”) which comprises the
consolidated statement of financial position as at 31 December 2025,
the consolidated statement of profit or loss and other comprehensive
income, the consolidated statement of changes in equity and the
consolidated statement of cash flows for the year then ended, notes to
the consolidated financial statements, including material accounting
policy information, the consolidated entity disclosure statement and the
directors’ declaration.
In our opinion, the accompanying financial report of the Group, is in
accordance with the Corporations Act 2001, including:
a)
giving a true and fair view of the group’s financial position as at 31
December 2025 and of its financial performance for the year then
ended; and
b)
complying
with
Australian
Accounting
Standards
and
the
Corporations Regulations 2001.
ADX ENERGY LTD
INDEPENDENT AUDITOR’S REPORT
Basis for Opinion
We conducted our audit
in
accordance with
Australian
Auditing
Standards. Our responsibilities under those standards are further
described in the Auditor’s Responsibilities for the Audit of the Financial
Report section of our report. We are independent of the Group in
accordance
with
the
auditor
independence
requirements
of
the
Corporations Act 2001 and the ethical requirements of the Accounting
Professional & Ethical Standards Board’s APES 110 Code of Ethics for
Professional Accountants (including Independence Standards) (“the
Code”) that are relevant to our audit of the financial report in Australia.
We have also fulfilled our other ethical responsibilities in accordance
with the Code.
We
confirm
that
the
independence
declaration
required
by
the
Corporations Act 2001, which has been given to the directors of the
Company, would be in the same terms if given to the directors as at the
time of this auditor’s report.
We believe that the audit evidence we have obtained is sufficient and
appropriate to provide a basis for our opinion.
Liability limited by a scheme approved under Professional Standards Legislation 
91

Key Audit Matter – Oil and Gas Properties. 
Refer to Note 9 to the financial statements
How our Audit Addressed the Key Audit Matter
The Group’s principal assets are oil and gas 
properties with a carrying value of  $31,766,212 
as at 31 December 2025.
The carrying value of these assets is considered 
to be a key audit matter given they represent 
approximately 75% of the total assets of the 
Group. 
Our procedures over oil and gas properties 
included but were not limited to the following:
•
We verified a sample of additions to assure the 
correct capitalisation process and the existence 
of the asset;
•
We reviewed management’s assessment for 
impairment; 
•
We applied our knowledge of the business and 
corroborated our work with publicly available 
external information; and
•
We assessed the appropriateness of the 
disclosures included in the financial report.
Key Audit Matter – Revenue. Refer to Note 2 
to the financial statements
How our Audit Addressed the Key Audit Matter
The Group generated revenue of $10,793,239  
predominately from the sale of oil and gas. 
Revenue recognition is considered to be a key 
audit matter given the significance of revenue to 
the group’s results and performance.
Our procedures over revenue included but were 
not limited to the following:
•
We documented and assessed the processes 
and controls in place to recognize revenue; 
•
We verified a sample of oil and gas sales 
revenue transactions and associated receipts to 
determine they were accurately accounted for; 
•
We reviewed the accounting policy for revenue 
recognition and ensured it was in accordance 
with AASB 15 “Revenue”; and
•
We assessed the appropriateness of the 
revenue disclosures included in the financial 
report.
ADX ENERGY LTD
INDEPENDENT AUDITOR’S REPORT (continued)
Material Uncertainty Related to Going Concern
We draw attention to Note 1 in the financial report, which indicates that the Group incurred a net loss of 
$13,066,998 and a net cash outflow from operating activities of $3,479,053 during the year ended 31 
December 2025. As stated in Note 1, these events or conditions along with other matters as set forth in 
Note 1 indicate that a material uncertainty exists that may cast significant doubt on the Group’s ability 
to continue as a going concern and therefore the Group may be unable to realise its assets and 
discharge its liabilities in the normal course of business. Our opinion is not modified in respect of this 
matter.
Key Audit Matters
Key audit matters are those matters that, in our professional judgement, were of most significance in 
our audit of the financial report of the current period. These matters were addressed in the context of 
our audit of the financial report as a whole, and in forming our opinion thereon, and we do not provide a 
separate opinion on these matters.
92

Information Other than the Financial Report and Auditor’s Report Thereon
The directors are responsible for the other information. The other information comprises the 
information included in the Group’s annual report for the year ended 31 December 2025, but does not 
include the financial report and our auditor’s report thereon. 
Our opinion on the financial report does not cover the other information and accordingly we do not 
express any form of assurance conclusion thereon.
In connection with our audit of the financial report, our responsibility is to read the other information 
and, in doing so, consider whether the other information is materially inconsistent with the financial 
report or our knowledge obtained in the audit or otherwise appears to be materially misstated. 
If, based on the work we have performed, we conclude that there is a material misstatement of this 
other information, we are required to report that fact. We have nothing to report in this regard.
Key Audit Matters (continued)
Key 
Audit 
Matter 
– 
Asset 
Retirement 
Obligations. Refer to Note 14 to the financial 
statements
How our Audit Addressed the Key Audit 
Matter
The Group has a significant asset retirement 
obligation provisions for the Austrian and 
Romanian oil and gas properties. 
These provisions are considered to be a key 
audit matter given they are subject to a significant 
level of judgement and are material in the context 
of the financial statements as a whole.
Our procedures over the asset retirement 
obligation provisions included but were not limited 
to the following:
•
We reviewed management’s estimate, the 
useful lives and valuation of the assets 
forming part of the asset retirement obligation;
•
We discussed with management as to the 
regulatory 
compliance 
surrounding 
their 
retirement obligations;
•
We 
re-performed 
the 
asset 
retirement 
obligation provision calculations, including 
testing the key assumptions, discount rates, 
timing of cash flows and arithmetical accuracy 
of management’s model;
•
We reviewed the compliance of the accounting 
treatment of the asset retirement obligation in 
accordance 
with 
AASB 
137 
Provisions, 
Contingent Liabilities and Contingent Assets, 
and
•
We assessed the appropriateness of the 
disclosures included in the financial report.
ADX ENERGY LTD
INDEPENDENT AUDITOR’S REPORT (continued)
93

Auditor’s Responsibilities for the Audit of the Financial Report
Our objectives are to obtain reasonable assurance about whether the financial report as a whole is free 
from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes 
our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit 
conducted in accordance with Australian Auditing Standards will always detect a material misstatement 
when it exists. Misstatements can arise from fraud or error and are considered material if individually or 
in the aggregate, they could reasonably be expected to influence the economic decisions of users 
taken on the basis of this financial report.
A further description of our responsibilities for the audit of the financial report is located at the Auditing 
and Assurance Standards Board website at: 
https://www.auasb.gov.au/media/bwvjcgre/ar1_2024.pdf.This description forms part of our auditor’s 
report.
Responsibilities of the Directors for the Financial Report 
The directors of the Company are responsible for the preparation of:
a)
the financial report that gives a true and fair view in accordance with Australian Accounting 
Standards and the Corporations Act 2001; and 
b)
the consolidated entity disclosure statement that is true and correct in accordance with the 
Corporations Act 2001, and 
for such internal control as the director determine is necessary to enable the preparation of:
i.
the financial report (other than the consolidated entity disclosure statement) that gives a true and 
fair view and is free from material misstatement, whether due to fraud or error; and
ii.
the consolidated entity disclosure statement that is true and correct and is free of misstatement, 
whether due to fraud or error.
In preparing the financial report, the directors are responsible for assessing the Group’s ability to 
continue as a going concern, disclosing, as applicable, matters related to going concern and using the 
going concern basis of accounting unless the director either intends to liquidate the Group or to cease 
operations, or have no realistic alternative but to do so.
ADX ENERGY LTD
INDEPENDENT AUDITOR’S REPORT (continued)
94

Responsibilities for the Remuneration Report
The directors of the Company are responsible for the preparation and presentation of the 
Remuneration Report in accordance with section 300A of the Corporations Act 2001. 
Our responsibility is to express an opinion on the Remuneration Report, based on our audit conducted 
in accordance with Australian Auditing Standards.
In.Corp Audit & Assurance Pty Ltd
Graham Webb
Director
30 March 2026
ADX ENERGY LTD
INDEPENDENT AUDITOR’S REPORT (continued)
REPORT ON THE REMUNERATION REPORT
Report on the Remuneration Report
We have audited the remuneration report included in the directors’ report for the year ended 
31 December 2025. 
In our opinion the remuneration report of ADX Energy Ltd for the year ended 31 December 2025 
complies with section 300A of the Corporations Act 2001.
95

ADX ENERGY LTD 
ADDITIONAL SHAREHOLDER INFORMATION 
__________________________________________________________________________________ 
- 96 - 
 
 
Information as at 25 March 2026 
 
a) Substantial Shareholders (who have lodged notices with ADX Energy Ltd)  
 
Name 
Number of Shares Disclosed in Substantial Holder Notice 
None 
 
 
 
b) Shareholder Distribution Schedule 
 
 
 
 
 
Size of Holding 
 
 
 
Number of 
Shareholders 
 
 
 
 
% of Shares 
 
Number of 
Quoted 
Option 
Holders 
 
 
 
% of Quoted 
Options 
 
1 - 
1,000 
108 
0.01% 
- 
- 
 
1,001 -  
5,000 
117 
0.04% 
- 
- 
 
5,001  -  
10,000 
337 
0.31% 
4 
0.06% 
 
10,001  - 
100,000 
996 
4.44% 
36 
3.48% 
 100,001  and over 
551 
95.20% 
52 
96.46% 
 
 
 
 
 
Total  
2,109 
100% 
92 
100% 
 
 
 
 
 
Number of shareholders holding 
less than a marketable parcel 
832 
 
 
 
 
 
c) Voting Rights  
 
Subject to any rights or restrictions for the time being attached to any class or classes of Shares, at meetings of 
Shareholders or classes of Shareholders: 
 
(i) 
each Shareholder entitled to vote may vote in person or by proxy or attorney, Representative; 
 
(ii) 
on a show of hands, every person present who is a Shareholder or a proxy, attorney or Representative of a 
Shareholder has one vote; and 
 
(i) 
on a poll every member entitled to vote and present in person or by proxy or attorney or representative duly 
authorised shall, in respect of each fully paid Share held by him, or in respect of which he is appointed a 
proxy, attorney or Representative, have one vote for the Share, but in respect of partly paid Shares, shall 
have such number of votes being equivalent to the proportion which the amount paid (not credited) is of 
the total amounts paid and payable in respect of those Shares (excluding amounts credited). 
 
There are no voting rights for Option holders or Performance Rights. 
 
 
  

ADX ENERGY LTD 
ADDITIONAL SHAREHOLDER INFORMATION 
__________________________________________________________________________________ 
- 97 - 
 
d)  Twenty largest Shareholders: 
 
 
 
Name 
Number of 
Ordinary 
Shares 
% of 
Issued 
Capital 
1. 
BNP PARIBAS NOMINEES PTY LTD ACF CLEARSTREAM 
181,803,993 
20.33 
2. 
CITICORP NOMINEES PTY LIMITED 
55,509,633 
6.21 
3. 
BNP PARIBAS NOMS PTY LTD 
46,766,809 
5.23 
4. 
MORGAN STANLEY AUSTRALIA SECURITIES (NOMINEE) PTY 
LIMITED  
31,716,525 
3.55 
5. 
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 
25,306,531 
2.83 
6. 
HAWKSBURN CAPITAL PTE LTD   
14,715,679 
1.65 
7. 
MR WILLIAM CLARK PHELPS  
14,285,715 
1.60 
8. 
BILPIN NOMINEES PTY LTD 
14,278,222 
1.60 
9. 
MR PAUL FINK 
12,224,542 
1.37 
10. 
BNP PARIBAS NOMINEES PTY LTD  
9,908,729 
1.11 
11. 
EONIA PTY LTD 
9,136,055 
1.02 
12. 
IRONSIDE PTY LTD  
8,757,734 
0.98 
13. 
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED - A/C 2 
6,538,073 
0.73 
14. 
BILPIN NOMINEES PTY LTD 
6,370,371 
0.71 
15. 
JETOSEA PTY LTD 
6,370,026 
0.71 
16. 
NGX COMMODITIES LTD 
6,360,608 
0.71 
17. 
SMERALDA PTY LTD  
6,241,891 
0.70 
18. 
IRONSIDE PTY LTD  
6,153,359 
0.69 
19. 
BMZ CAPITAL PTY LTD 
5,515,556 
0.62 
20. 
JUSTAKA PTY LTD  
5,420,978 
0.61 
 
 
473,381,029 
52.96 
 
Remaining Holders Balance 
420,975,337 
 
 
Shares on issue 
894,356,366 
 
 
 
 

ADX ENERGY LTD 
ADDITIONAL SHAREHOLDER INFORMATION 
__________________________________________________________________________________ 
- 98 - 
 
e) Twenty largest Quoted Optionholders: 
 
 
 
Name 
Number of 
Quoted 
Options 
% of 
Quoted 
Options 
1. 
MORGAN STANLEY AUSTRALIA SECURITIES (NOMINEE) PTY 
LIMITED  
14,996,119 
23.33 
2. 
CITICORP NOMINEES PTY LIMITED 
11,085,716 
17.24 
3. 
MR WILLIAM CLARK PHELPS  
7,142,858 
11.11 
4. 
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 
4,390,476 
6.83 
5. 
MR COLIN MILLS + MISS TRACY MILLS  
2,615,000 
4.07 
6. 
MR DOMENIC MARINO 
2,006,227 
3.12 
7. 
MR COLIN MILLS 
1,633,000 
2.54 
8. 
EQUITY TRUSTEES LIMITED  
1,428,572 
2.22 
9. 
TREASURY SERVICES GROUP PTY LTD  
1,190,477 
1.85 
10. 
NEXCAR PTY LTD  
1,000,000 
1.56 
11. 
BNP PARIBAS NOMINEES PTY LTD BARCLAYS 
952,382 
1.48 
12. 
IRONSIDE PTY LTD  
952,382 
1.48 
13. 
WAVELL BROCKMAN PTY LTD  
855,121 
1.33 
14. 
BILPIN NOMINEES PTY LTD 
785,715 
1.22 
15. 
JETOSEA PTY LTD 
766,667 
1.19 
16. 
MR PETER IRONSIDE  
757,093 
1.18 
17. 
MR WILLIAM HOWARD MARTIN 
606,000 
0.94 
18. 
AUSVAAL PTY LTD 
500,000 
0.78 
19. 
MR FARIS SALIM CASSIM 
500,000 
0.78 
20. 
IRONSIDE PTY LTD  
476,191 
0.74 
 
 
54,639,996 
84.99 
 
Remaining Holders Balance 
9,645,735 
 
 
Quoted options on issue 
64,285,731 
 
 
 

ADX ENERGY LTD 
ADDITIONAL SHAREHOLDER INFORMATION 
__________________________________________________________________________________ 
- 99 - 
 
f) 
Unlisted Options (Holders of more than 20%): 
 
 
Number 
Exercise 
Price 
Expiry Date 
Holders of >20% 
Unlisted Options  
            500,000  
17 cents 
31/03/2026 
Mr John Begg (100%) 
Unlisted Options  
2,000,000  
5 cents 
31/03/2026 
Chippenham Superannuation Pty Ltd  
 (25%),  
Ironside Pty Ltd  
 (50%),  
Mr Gary John Jeffery & Mrs Jane Elizabeth 
Jeffery  (25%) 
Unlisted Options  
23,000,000  
5.5 cents 
31/03/2026 
Jetosea Pty Ltd (43.5%), remainder varies 
holders < 20% 
Unlisted Options  
            269,532  
Nil cents 
31/07/2026 
Mr Ian Tchacos (100%) 
Unlisted Options  
            380,358  
Nil cents 
31/10/2026 
Mr Ian Tchacos (100%) 
Unlisted Options  
            283,929  
Nil cents 
31/01/2027 
Mr Ian Tchacos (100%) 
Unlisted Options  
            275,893  
Nil cents 
31/05/2027 
Mr Ian Tchacos (100%) 
Unlisted Options  
            300,000  
Nil cents 
31/07/2027 
Mr Ian Tchacos (100%) 
Unlisted Options  
218,750 
Nil cents 
31/10/2027 
Mr Ian Tchacos (100%) 
Unlisted Options  
            131,425  
Nil cents 
31/01/2028 
Mr Ian Tchacos (100%) 
Unlisted Options  
              89,003  
Nil cents 
31/05/2028 
Mr Ian Tchacos (100%) 
Unlisted Options  
196,514  
Nil cents 
31/07/2028 
Mr Ian Tchacos (100%) 
Unlisted Options  
167,079  
Nil cents 
31/10/2028 
Mr Ian Tchacos (100%) 
Unlisted Options  
            213,068  
Nil cents 
31/01/2029 
Mr Ian Tchacos (100%) 
Unlisted Options  
            670,673  
Nil cents 
31/05/2029 
Mr Ian Tchacos (100%) 
Unlisted Options  
        1,005,387  
Nil cents 
31/07/2029 
Mr Ian Tchacos (64%) and Mr Paul Fink 
(36%) 
Unlisted Options  
        1,095,312  
Nil cents 
31/10/2029 
Mr Ian Tchacos (64%) and Mr Paul Fink 
(36%) 
Unlisted Options  
      1,098,957  
Nil cents 
31/01/2030 
Mr Ian Tchacos (47%) and Mr Paul Fink 
(53%) 
Unlisted Options  
86,615,403 
3.9 cents 
17/01/2028 
No holders > 20% 
Total Options  
118,511,283 
  
  
 
 
 

ADX ENERGY LTD 
TENEMENT / PERMIT SCHEDULE 
__________________________________________________________________________________ 
- 100 - 
 
 
 
Permit 
 
% held  
Onshore Austria, Zistersdorf and Gaiselberg Production Licence  
100% 
Upper Austria ADX-AT-I AGS Licence (a)  
100% 
Upper Austria ADX-AT-II AGS Licence (b)  
100% 
Onshore Romania, Parta (c) 
100% 
Onshore Romania, Iecea Mare Production Licence (c) 
100% 
Offshore Italy, C.R 150.AU  
100% 
 
Note a: ADX-AT-I Concession agreement for exploration, production and gas storage in Upper Austria. 
ADX holds a 100% interest in the ADX-AT-I exploration licence. ADX’ interest in part of this licence, the MND Investment 
Area, has reduced to 50% due to the completion of MND’s investment obligations under the energy investment agreement 
relating to the MND Investment Area with the funding of the Lichtenberg-1 well (refer ASX release 8 January 2024).  
Note b: ADX-AT-II Concession agreement for exploration, production and gas storage in Upper Austria 
 ADX holds a 100% interest in the ADX-AT-II exploration licence, except as follows: 
o 
ADX holds a 75% interest in the Welchau Area of the ADX-AT-II licence; and 
o 
ADX holds a 70% interest in Anshof Field Area of the ADX-AT-II licence other than the Anshof-2A well where ADX 
holds a 60% interest.  
Note c: ADX holds a 49.2% shareholding in Danube Petroleum Limited (Danube). The remaining shareholding in Danube is 
held by Reabold Resources Plc. Danube via ADX Energy Panonia holds a 100% interest in the Parta Exploration licence 
(including a 100% interest in the Parta Appraisal Sole Risk Project) and a 100% interest in the Iecea Mare Production licence. 
ADX is the operator of the permit pursuant to a Services Agreement with Danube.